ACHP | Stragetic Sustainability Performance Plans
Sustainability Performance Plan (SSPP). Click here to access these plans. The ACHP's SSPP addresses how the Strategic Sustainability Performance Plan 2012 (PDF) ACHP Strategic Sustainability Performance Plan 2011 (PDF) ACHP Strategic Sustainability Performance Plan 2010 (PDF) Updated August 5, 2013 Return to Top
77 FR 37683 - Statement of Organization, Functions, and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... update of strategic plans and performance goals. Oversees the CMS Challenge Competition, working with... strategic plans with Department of Health and Human Services' 5-year strategic plan and performance goals...
Aqua/Aura Updated Inclination Adjust Maneuver Performance Prediction Model
NASA Technical Reports Server (NTRS)
Boone, Spencer
2017-01-01
This presentation will discuss the updated Inclination Adjust Maneuver (IAM) performance prediction model that was developed for Aqua and Aura following the 2017 IAM series. This updated model uses statistical regression methods to identify potential long-term trends in maneuver parameters, yielding improved predictions when re-planning past maneuvers. The presentation has been reviewed and approved by Eric Moyer, ESMO Deputy Project Manager.
75 FR 1622 - Sunshine Act; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-12
.... Monthly Investment Performance Report. c. Legislative Report. 3. Website Re-Design Update. 4. IT Modernization Plan Update. 5. Quarterly Vendor Financial Report. 6. Review of Gross and Net Expense Ratios...
76 FR 58020 - Prescription Drug User Fee Act IV Information Technology Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-19
...] Prescription Drug User Fee Act IV Information Technology Plan AGENCY: Food and Drug Administration, HHS. ACTION... information technology (IT) plan entitled ``PDUFA IV Information Technology Plan'' (updated plan) to achieve... Information Technology Plan.'' This plan will meet one of the performance goals agreed to under the 2007...
National Radiation Hardness Assurance (RHA) Planning For NASA Missions: Updated Guidance
NASA Technical Reports Server (NTRS)
LaBel, Kenneth A.; Pellish, Jonathan Allen
2014-01-01
Radiation Hardness Assurance (RHA) is the process of ensuring space system performance in the presence of a space radiation environment. Herein, we present an updated NASA methodology for RHA focusing on content, deliverables and timeframes.
Notional Radiation Hardness Assurance (RHA) Planning For NASA Missions: Updated Guidance
NASA Technical Reports Server (NTRS)
LaBel, Kenneth A.; Pellish, Jonathan A.
2014-01-01
Radiation Hardness Assurance (RHA) is the process of ensuring space system performance in the presence of a space radiation environment. Herein, we present an updated NASA methodology for RHA focusing on content, deliverables and timeframes.
SmartWay strategic plan : 2007 annual report
DOT National Transportation Integrated Search
2007-12-01
This document presents an update to the ITS Strategic Plan, effective December 2007. The key plan elements are listed below: a definition of ITS, ITS user services relevant to the agency; performance measures to identify roadway segments and corridor...
2000 Montana state rail plan update
DOT National Transportation Integrated Search
2000-01-01
This 2000 Montana Rail Plan Update is a comprehensive update of the State Rail Plan. The purpose of this update is to review the State's role in rail planning, retain eligibility for Local Rail Freight Assistance (LRFA) funding, update the descriptio...
Connections 2030 performance monitoring.
DOT National Transportation Integrated Search
2011-01-01
The Wisconsin Department of Transportation (WisDOT) recently updated its long-range : multimodal plan. This plan, referred to as Connections 2030, provides a policy framework for : moving towards a safer and more efficient transportation system that ...
SERC 2014 2018 Technical Plan: 2016 Update
2016-02-18
Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update SERC 2014-2018 Technical Plan: 2016 Update...UNCLASSIFIED / APPROVED FOR PUBLIC RELEASE Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update ii...18, 2016 SERC 2014-2018 Technical Plan Update iii TABLE OF CONTENTS Table of Contents
49 CFR 194.121 - Response plan review and update procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Response plan review and update procedures. 194... SAFETY RESPONSE PLANS FOR ONSHORE OIL PIPELINES Response Plans § 194.121 Response plan review and update procedures. (a) Each operator shall update its response plan to address new or different operating conditions...
49 CFR 194.121 - Response plan review and update procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Response plan review and update procedures. 194... SAFETY RESPONSE PLANS FOR ONSHORE OIL PIPELINES Response Plans § 194.121 Response plan review and update procedures. (a) Each operator shall update its response plan to address new or different operating conditions...
49 CFR 194.121 - Response plan review and update procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 3 2014-10-01 2014-10-01 false Response plan review and update procedures. 194... SAFETY RESPONSE PLANS FOR ONSHORE OIL PIPELINES Response Plans § 194.121 Response plan review and update procedures. (a) Each operator shall update its response plan to address new or different operating conditions...
49 CFR 194.121 - Response plan review and update procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 3 2012-10-01 2012-10-01 false Response plan review and update procedures. 194... SAFETY RESPONSE PLANS FOR ONSHORE OIL PIPELINES Response Plans § 194.121 Response plan review and update procedures. (a) Each operator shall update its response plan to address new or different operating conditions...
49 CFR 194.121 - Response plan review and update procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Response plan review and update procedures. 194... SAFETY RESPONSE PLANS FOR ONSHORE OIL PIPELINES Response Plans § 194.121 Response plan review and update procedures. (a) Each operator shall update its response plan to address new or different operating conditions...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoo, Jun Soo; Choi, Yong Joon; Smith, Curtis Lee
2016-09-01
This document addresses two subjects involved with the RELAP-7 Software Verification and Validation Plan (SVVP): (i) the principles and plan to assure the independence of RELAP-7 assessment through the code development process, and (ii) the work performed to establish the RELAP-7 assessment plan, i.e., the assessment strategy, literature review, and identification of RELAP-7 requirements. Then, the Requirements Traceability Matrices (RTMs) proposed in previous document (INL-EXT-15-36684) are updated. These RTMs provide an efficient way to evaluate the RELAP-7 development status as well as the maturity of RELAP-7 assessment through the development process.
Hubble Space Telescope. Update: 18 months in orbit
NASA Technical Reports Server (NTRS)
1990-01-01
In April 1990, Space Shuttle Discovery launched the Hubble Space Telescope (HST). An 18 month in-orbit update of the operations and performance of the HST is presented. Numerous color photographs are shown of objects already observed, and mission plans are presented for future observations by the HST.
Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHULTZ, E.A.
The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.
DOE Office of Scientific and Technical Information (OSTI.GOV)
OHara J. M.; Higgins, J.; Fleger, S.
The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodicmore » update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. NUREG-0711 is the first document to be addressed. We present the methodology used to update NUREG-0711 and summarize the main changes made. Finally, we discuss the current status of the update program and the future plans.« less
Updated recommendations: an assessment of NICE clinical guidelines
2014-01-01
Background Updating is important to ensure clinical guideline (CG) recommendations remain valid. However, little research has been undertaken in this field. We assessed CGs produced by the National Institute for Health and Care Excellence (NICE) to identify and describe updated recommendations and to investigate potential factors associated with updating. Also, we evaluated the reporting and presentation of recommendation changes. Methods We performed a descriptive analysis of original and updated CGs and recommendations, and an assessment of presentation formats and methods for recording information. We conducted a case-control study, defining cases as original recommendations that were updated (‘new-replaced’ recommendations), and controls as original recommendations that were considered to remain valid (‘not changed’ recommendations). We performed a comparison of main characteristics between cases and controls, and we planned a multiple regression analysis to identify potential predictive factors for updating. Results We included nine updated CGs (1,306 recommendations) and their corresponding original versions (1,106 recommendations). Updated CGs included 812 (62%) recommendations ‘not reviewed’, 368 (28.1%) ‘new’ recommendations, 104 (7.9%) ‘amended’ recommendations, and 25 (1.9%) recommendations reviewed but unchanged. The presentation formats used to indicate the changes in recommendations varied widely across CGs. Changes in ‘amended’, ‘deleted’, and ‘new-replaced’ recommendations (n = 296) were reported infrequently, mostly in appendices. These changes were recorded in 167 (56.4%) recommendations; and were explained in 81 (27.4%) recommendations. We retrieved a total of 7.1% (n = 78) case recommendations (‘new-replaced’) and 2.4% (n = 27) control recommendations (‘not changed’) in original CGs. The updates were mainly from ‘Fertility CG’, about ‘gynaecology, pregnancy and birth’ topic, and ‘treatment’ or ‘prevention’ purposes. We did not perform the multiple regression analysis as originally planned due to the small sample of recommendations retrieved. Conclusion Our study is the first to describe and assess updated CGs and recommendations from a national guideline program. Our results highlight the pressing need to standardise the reporting and presentation of updated recommendations and the research gap about the optimal way to present updates to guideline users. Furthermore, there is a need to investigate updating predictive factors. PMID:24919856
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant, C W; Lenderman, J S; Gansemer, J D
This document is an update to the 'ADIS Algorithm Evaluation Project Plan' specified in the Statement of Work for the US-VISIT Identity Matching Algorithm Evaluation Program, as deliverable II.D.1. The original plan was delivered in August 2010. This document modifies the plan to reflect modified deliverables reflecting delays in obtaining a database refresh. This document describes the revised schedule of the program deliverables. The detailed description of the processes used, the statistical analysis processes and the results of the statistical analysis will be described fully in the program deliverables. The US-VISIT Identity Matching Algorithm Evaluation Program is work performed bymore » Lawrence Livermore National Laboratory (LLNL) under IAA HSHQVT-07-X-00002 P00004 from the Department of Homeland Security (DHS).« less
2014 Behavioral Health and Performance Standing Review Panel
NASA Technical Reports Server (NTRS)
Steinberg, Susan; Leon, Gloria; Dimsdale, Joel; Balkin, Thomas; Bono, Joyce; Caldwell, John; Joiner, Thomas; Paulus, Martin; Zaccaro, Stephen
2015-01-01
The 2014 Behavioral Health and Performance (BHP) Standing Review Panel (from here on referred to as the SRP) met for a site visit in Houston, TX on December 17 - 18, 2014. The SRP reviewed the updated research plan for the Risk of Performance Errors Due to Fatigue Resulting from Sleep Loss, Circadian Desynchronization, Extended Wakefulness, and Work Overload (Sleep Risk) and also received a status update on the Risk of Adverse Behavioral Conditions and Psychiatric Disorders (BMed Risk) and the Risk of Performance Decrements Due to Inadequate Cooperation, Coordination, Communication, and Psychosocial Adaptation within a Team (Team Risk).
U.S. Department of Education FY 2009 Annual Performance Report
ERIC Educational Resources Information Center
US Department of Education, 2010
2010-01-01
The United States Department of Education's "Annual Performance Report" (APR) for fiscal year (FY) 2009 provides detailed information on how the outcomes of the strategic performance measures identified in its "FY 2007-2012 Strategic Plan" and updated in the "Fiscal Year 2008 Performance and Accountability Report"…
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Tennessee long-range transportation plan : aviation system plan update
DOT National Transportation Integrated Search
2005-01-01
This plan update is streamlined in nature and will only consider the ttates six commercial service airports and 14 regional airports. The tasks completed for this update included an inventory of facilities, aviation industry review, review and upd...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-07
... NIOSH 134-A] Request for Information: Update of NIOSH Nanotechnology Strategic Plan for Research and... management research that should be considered for updating the NIOSH 2009 nanotechnology strategic plan... identifying and prioritizing nanotechnology research. In 2009 this strategic plan [http:// www.cdc.gov/niosh...
Master Plan: Lake Barkley, Cumberland River, Kentucky - Tennessee.
1983-01-01
VASE 2 LOISVLLE7, DIXON GPM INGTAt PARK 28 PT. MA6AC STT PARR-*BCOLUMBUS BELMONT BATTLE ST PARK 10 REELFOOT LAKE STATV P-’ t ELYFREST STATE PAP, 01.6T...Plan: Lake garkley,Cumberland River, 3 Kentucky - Tennessee. Master Plan Update. 6. PERFORMING ORG. REPORT NUMBER 7- AUTHOR(s) 8. CONTRACT OR GRANT...block number) Lake Barkley, Kentucky. Interpretative programs. Cumberland River Recreation. Land Between the Lakes . Master Plan. 20. ABSTRACT (Continue
Visiting Vehicle Ground Trajectory Tool
NASA Technical Reports Server (NTRS)
Hamm, Dustin
2013-01-01
The International Space Station (ISS) Visiting Vehicle Group needed a targeting tool for vehicles that rendezvous with the ISS. The Visiting Vehicle Ground Trajectory targeting tool provides the ability to perform both realtime and planning operations for the Visiting Vehicle Group. This tool provides a highly reconfigurable base, which allows the Visiting Vehicle Group to perform their work. The application is composed of a telemetry processing function, a relative motion function, a targeting function, a vector view, and 2D/3D world map type graphics. The software tool provides the ability to plan a rendezvous trajectory for vehicles that visit the ISS. It models these relative trajectories using planned and realtime data from the vehicle. The tool monitors ongoing rendezvous trajectory relative motion, and ensures visiting vehicles stay within agreed corridors. The software provides the ability to update or re-plan a rendezvous to support contingency operations. Adding new parameters and incorporating them into the system was previously not available on-the-fly. If an unanticipated capability wasn't discovered until the vehicle was flying, there was no way to update things.
Update of FDOT state park & ride lot program planning manual chapters 3, 4, and 6
DOT National Transportation Integrated Search
2001-04-01
Portions of the Florida Department of Transportation (FDOT) State Park & Ride Lot Program Planning Manual, first published in 1989 and revised in 1996, were updated. The scope included examination, testing, and updating, as necessary, the planning fo...
2015-08-27
ensure the functional assessment plans ( FAP ) for the three services contained all contractor work requiring assessment, measurable performance...review the FAPs after development and revisions to the FAPs , and did not require additional controls over the contractor assessment process in an...revised as follows: • Business Management System B-14.3 was updated to require the contract officer representative conduct a FAP review to ensure
Technology for the future - Long range planning for space technology development
NASA Technical Reports Server (NTRS)
Collier, Lisa D.; Breckenridge, Roger A.; Llewellyn, Charles P.
1992-01-01
NASA's Office of Aeronautics and Space Technology (OAST) has begun the definition of an Integrated Technology Plan for the civilian space program which guides long-term technology development for space platforms, in light of continuing marker research and other planning data. OAST has conferred particular responsibility for future candidate space mission evaluations and platform performance requirement projections to NASA-Langley. An implementation plan is devised which is amenable to periodic space-platform technology updates.
Draft Updates to the Planning for Natural Disaster Debris Guidance and to Related Documents
EPA is requesting comment on the draft update of the Planning for Natural Disaster Debris Guidance, along with two other documents. This Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.
This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC`s Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented.more » Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review.« less
NATIONAL METAL FINISHING ENVIRONMENTAL R&D PLAN - AN UPDATE
This document is an update to the National Metal Finishing Environmental R&D Plan (EPA/600/R-97/095), dated September 1997. The 1997 Plan and Update are available on the National Metal Finishing Resource Center's web site, www.nmfrc.org. The primary purpose in preparing an up...
U.S. Department of Education FY 2010 Annual Performance Report
ERIC Educational Resources Information Center
US Department of Education, 2011
2011-01-01
This paper presents the U.S. Department of Education's Fiscal Year (FY) "2010 Annual Performance Report" (APR). This report provides detailed information on: (1) the status of strategic goals, and (2) the outcomes of the strategic performance measures identified in the Department's "FY 2007-2012 Strategic Plan" and updated previously in the "FY…
DOT National Transportation Integrated Search
1992-04-01
Mid-America Regional Council, the designated Metropolitan Planning Organization for the Kansas City Metropolitan Area, performed a Small Sample Travel Survey for the Kansas City region to collect data to update the MARC travel demand models. The resu...
Cohen, Aaron M; Ambert, Kyle; McDonagh, Marian
2012-04-19
Systematic Reviews (SRs) are an essential part of evidence-based medicine, providing support for clinical practice and policy on a wide range of medical topics. However, producing SRs is resource-intensive, and progress in the research they review leads to SRs becoming outdated, requiring updates. Although the question of how and when to update SRs has been studied, the best method for determining when to update is still unclear, necessitating further research. In this work we study the potential impact of a machine learning-based automated system for providing alerts when new publications become available within an SR topic. Some of these new publications are especially important, as they report findings that are more likely to initiate a review update. To this end, we have designed a classification algorithm to identify articles that are likely to be included in an SR update, along with an annotation scheme designed to identify the most important publications in a topic area. Using an SR database containing over 70,000 articles, we annotated articles from 9 topics that had received an update during the study period. The algorithm was then evaluated in terms of the overall correct and incorrect alert rate for publications meeting the topic inclusion criteria, as well as in terms of its ability to identify important, update-motivating publications in a topic area. Our initial approach, based on our previous work in topic-specific SR publication classification, identifies over 70% of the most important new publications, while maintaining a low overall alert rate. We performed an initial analysis of the opportunities and challenges in aiding the SR update planning process with an informatics-based machine learning approach. Alerts could be a useful tool in the planning, scheduling, and allocation of resources for SR updates, providing an improvement in timeliness and coverage for the large number of medical topics needing SRs. While the performance of this initial method is not perfect, it could be a useful supplement to current approaches to scheduling an SR update. Approaches specifically targeting the types of important publications identified by this work are likely to improve results.
2012-01-01
Background Systematic Reviews (SRs) are an essential part of evidence-based medicine, providing support for clinical practice and policy on a wide range of medical topics. However, producing SRs is resource-intensive, and progress in the research they review leads to SRs becoming outdated, requiring updates. Although the question of how and when to update SRs has been studied, the best method for determining when to update is still unclear, necessitating further research. Methods In this work we study the potential impact of a machine learning-based automated system for providing alerts when new publications become available within an SR topic. Some of these new publications are especially important, as they report findings that are more likely to initiate a review update. To this end, we have designed a classification algorithm to identify articles that are likely to be included in an SR update, along with an annotation scheme designed to identify the most important publications in a topic area. Using an SR database containing over 70,000 articles, we annotated articles from 9 topics that had received an update during the study period. The algorithm was then evaluated in terms of the overall correct and incorrect alert rate for publications meeting the topic inclusion criteria, as well as in terms of its ability to identify important, update-motivating publications in a topic area. Results Our initial approach, based on our previous work in topic-specific SR publication classification, identifies over 70% of the most important new publications, while maintaining a low overall alert rate. Conclusions We performed an initial analysis of the opportunities and challenges in aiding the SR update planning process with an informatics-based machine learning approach. Alerts could be a useful tool in the planning, scheduling, and allocation of resources for SR updates, providing an improvement in timeliness and coverage for the large number of medical topics needing SRs. While the performance of this initial method is not perfect, it could be a useful supplement to current approaches to scheduling an SR update. Approaches specifically targeting the types of important publications identified by this work are likely to improve results. PMID:22515596
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-26
...] Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Update of the Motor Vehicle... Implementation Plan (SIP). The revisions consist of an update to the SIP-approved Motor Vehicle Emissions Budgets... operation, and special arrangements should be made for deliveries of boxed information. Instructions: Direct...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-23
... Plan to update the Commission's human health and aquatic life stream quality objectives (also called... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Update Water Quality Criteria for Toxic Pollutants in the Delaware...
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
NASA Technical Reports Server (NTRS)
Newman, C. M.
1977-01-01
The updated consumables flight planning worksheet (CFPWS) is documented. The update includes: (1) additional consumables: ECLSS ammonia, APU propellant, HYD water; (2) additional on orbit activity for development flight instrumentation (DFI); (3) updated use factors for all consumables; and (4) sources and derivations of the use factors.
HFE Process Guidance and Standards for potential application to updating NRC guidance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jacques Hugo; J. J. Persensky
2012-07-01
The U.S. Nuclear Regulatory Commission (NRC) reviews and evaluates the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed tomore » the periodic update and improvement of these guidance documents to ensure that they remain state-of-the-art design evaluation tools. Thus, the NRC has initiated a project with BNL to update the NRC guidance to remain current with recent research on human performance, advances in HFE methods and tools, and new technology. INL supported Brookhaven National Lab (BNL) to update the detailed HFE review criteria contained in NUREG-0711 and NUREG-0700 based on (1) feedback obtained from end users, (2) the results of NRC research and development efforts supporting the NRC staff’s HFE safety reviews, and (3) other material the project staff identify as applicable to the update effort. INL submitted comments on development plans and sections of NUREGs 0800, 0711, and 0700. The contractor prepared the report attached here as the deliverable for this work.« less
ECOD: new developments in the evolutionary classification of domains
Schaeffer, R. Dustin; Liao, Yuxing; Cheng, Hua; Grishin, Nick V.
2017-01-01
Evolutionary Classification Of protein Domains (ECOD) (http://prodata.swmed.edu/ecod) comprehensively classifies protein with known spatial structures maintained by the Protein Data Bank (PDB) into evolutionary groups of protein domains. ECOD relies on a combination of automatic and manual weekly updates to achieve its high accuracy and coverage with a short update cycle. ECOD classifies the approximately 120 000 depositions of the PDB into more than 500 000 domains in ∼3400 homologous groups. We show the performance of the weekly update pipeline since the release of ECOD, describe improvements to the ECOD website and available search options, and discuss novel structures and homologous groups that have been classified in the recent updates. Finally, we discuss the future directions of ECOD and further improvements planned for the hierarchy and update process. PMID:27899594
Code of Federal Regulations, 2013 CFR
2013-01-01
... structure, and update the plan as necessary. Agency operating components and field installations required to... review and update of their plans. (2) Plans shall cover a time period of not less than one year and may... most recent plan was effective or was last amended. (e) Plan Content. Disabled veteran affirmative...
Code of Federal Regulations, 2011 CFR
2011-01-01
... structure, and update the plan as necessary. Agency operating components and field installations required to... review and update of their plans. (2) Plans shall cover a time period of not less than one year and may... most recent plan was effective or was last amended. (e) Plan Content. Disabled veteran affirmative...
Code of Federal Regulations, 2014 CFR
2014-01-01
... structure, and update the plan as necessary. Agency operating components and field installations required to... review and update of their plans. (2) Plans shall cover a time period of not less than one year and may... most recent plan was effective or was last amended. (e) Plan Content. Disabled veteran affirmative...
Code of Federal Regulations, 2010 CFR
2010-01-01
... structure, and update the plan as necessary. Agency operating components and field installations required to... review and update of their plans. (2) Plans shall cover a time period of not less than one year and may... most recent plan was effective or was last amended. (e) Plan Content. Disabled veteran affirmative...
Preparing for the update of New Hampshire’s strategic highway safety plan.
DOT National Transportation Integrated Search
2015-01-01
NHDOTs objectives in requesting the peer exchange were to: Build a sustainable SHSP by energizing existing and developing cooperative partnerships among highway safety stakeholders; Strengthen the goals, strategies, and performance trackin...
San Diego transit five year plan update : FY 1982-1986
DOT National Transportation Integrated Search
1981-07-01
The Five Year Plan Update constitutes the annual revision to the operating plan and capital program for the following five year planning period, presents its adopted budget and a specific operating plan and capital program for FY 1982 as well as less...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-28
.... PHMSA-2010-0175] Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil... 194. In light of the Deepwater Horizon oil spill in the Gulf of Mexico, which has resulted in the... Systems. Subject: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill. Advisory...
78 FR 38782 - Public Review and Comment; Public Hearing-2013 Update of Comprehensive Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-27
... management of the basin's water resources. As part of the public comment process, the Commission will hold a... 2013 Update of the Comprehensive Plan for the Water Resources of the Susquehanna River Basin and other... Susquehanna River Basin Commission released a proposed 2013 Update of the Comprehensive Plan for the Water...
32 CFR 37.885 - May I require updated program plans?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 1 2011-07-01 2011-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...
32 CFR 37.885 - May I require updated program plans?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 1 2013-07-01 2013-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...
32 CFR 37.885 - May I require updated program plans?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 1 2010-07-01 2010-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...
32 CFR 37.885 - May I require updated program plans?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 1 2012-07-01 2012-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...
32 CFR 37.885 - May I require updated program plans?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 1 2014-07-01 2014-07-01 false May I require updated program plans? 37.885 Section 37.885 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND... Financial and Programmatic Reporting § 37.885 May I require updated program plans? In addition to reports on...
Mobility 2025 update : the metropolitan transportation plan : executive summary
DOT National Transportation Integrated Search
2009-01-01
Mobility 2025 Update: The Metropolitan Transportation Plan website. Mobility 2025 Update is the defining vision for transportation systems and services in the Dallas-Fort Worth metropolitan area. Serving as a guide for the expenditure of state and fe...
Data reduction procedures for traffic signal systems performance measures.
DOT National Transportation Integrated Search
2011-01-01
Traffic signal systems represent a substantial component of the highway transportation network in the United States. It is challenging for most agencies to find engineering resources to properly update signal policies and timing plans to accommodate ...
Methodology update for estimating volume to service flow ratio.
DOT National Transportation Integrated Search
2015-12-01
Volume/service flow ratio (VSF) is calculated by the Highway Performance Monitoring System (HPMS) software as an indicator of peak hour congestion. It is an essential input to the Kentucky Transportation Cabinets (KYTC) key planning applications, ...
78 FR 4150 - Update of NIOSH Nanotechnology Strategic Plan for Research and Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
...; NIOSH-134-B] Update of NIOSH Nanotechnology Strategic Plan for Research and Guidance AGENCY: National... Nanotechnology Strategic Plan for Research and Guidance. SUMMARY: The National Institute for Occupational Safety... NIOSH FY2013-FY2016 nanotechnology strategic plan. This draft strategic plan (Protecting the...
EOS Terra Terra Constellation Exit/Future Maneuver Plans Update
NASA Technical Reports Server (NTRS)
Mantziaras, Dimitrios
2016-01-01
This EOS Terra Constellation Exit/Future Maneuver Plans Update presentation will discuss brief history of Terra EOM work; lifetime fuel estimates; baseline vs. proposed plan origin; resultant exit orbit; baseline vs. proposed exit plan; long term orbit altitude; revised lifetime proposal and fallback options.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-15
... Strategic Plan was approved in 2011. All Federal Agencies are required to publish an updated Strategic Plan... and Community Service Strategic Plan; Request for Input AGENCY: Corporation for National and Community Service (CNCS). ACTION: Request for Input on Proposed Update of the CNCS Strategic Plan. SUMMARY: The...
Object-oriented fault tree models applied to system diagnosis
NASA Technical Reports Server (NTRS)
Iverson, David L.; Patterson-Hine, F. A.
1990-01-01
When a diagnosis system is used in a dynamic environment, such as the distributed computer system planned for use on Space Station Freedom, it must execute quickly and its knowledge base must be easily updated. Representing system knowledge as object-oriented augmented fault trees provides both features. The diagnosis system described here is based on the failure cause identification process of the diagnostic system described by Narayanan and Viswanadham. Their system has been enhanced in this implementation by replacing the knowledge base of if-then rules with an object-oriented fault tree representation. This allows the system to perform its task much faster and facilitates dynamic updating of the knowledge base in a changing diagnosis environment. Accessing the information contained in the objects is more efficient than performing a lookup operation on an indexed rule base. Additionally, the object-oriented fault trees can be easily updated to represent current system status. This paper describes the fault tree representation, the diagnosis algorithm extensions, and an example application of this system. Comparisons are made between the object-oriented fault tree knowledge structure solution and one implementation of a rule-based solution. Plans for future work on this system are also discussed.
10 CFR 603.885 - Updated program plans and budgets.
Code of Federal Regulations, 2011 CFR
2011-01-01
... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision requiring the recipient to annually prepare an updated technical plan for future conduct of the research...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-03
... County, Indiana for Sulfur Dioxide AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a maintenance plan update for the Lake County, Indiana sulfur dioxide...
78 FR 34095 - Adequacy Status of the Idaho, Northern Ada County PM10
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-06
... 10 State Implementation Plan, Maintenance Plan: Ten-Year Update (Maintenance Plan Update) are..., Northern Ada County PM 10 State Implementation Plan for Transportation Conformity Purposes AGENCY... particulate matter with an aerodynamic diameter of a nominal 10 microns or less (PM 10 ), nitrogen oxides (NOx...
Williamsport Area Community College Long Range Planning: The Long Range Plan, Update 1987.
ERIC Educational Resources Information Center
Williamsport Area Community Coll., PA.
This update to Williamsport Area Community College's (WACC's) 1984-89 long-range plan offers a status report on each of the plan's 78 objectives, reassigns responsibility for specific objectives to make the plan responsive to the current organizational structure of the college, and offers 11 new objectives for the 1986-87 academic year. After…
Multi-family update to the passive solar construction handbook
NASA Astrophysics Data System (ADS)
Howard, B. D.; Callahan, K. D.
1983-11-01
Builders and developers will accept passive solar construction and designs for integration with their existing practice if accurate and detailed plans of actual, proven passive solar subsystems and assemblies are made available to them. A Passive Solar Construction Handbook was developed. It focuses primarily upon single family homes. The multifamily update of the Handbook, is described and examples of the valuable builder information are shown. It represents a new breakthrough in DOE sponsored projects, performing a Technology Transfer on a most useful level.
2013 Advanced Environmental Health/Advanced Food Technology Standing Review Panel Final Report
NASA Technical Reports Server (NTRS)
Steinberg, Susan
2014-01-01
The 2013 Advanced Environmental Health/Advanced Food Technology (AEH/AFT) Standing Review Panel (from here on referred to as the SRP) participated in a WebEx/teleconference with members of the Space Human Factors and Habitability (SHFH) Element, representatives from the Human Research Program (HRP), and NASA Headquarters on November 22, 2013 (list of participants is in Section IX of this report). The SRP reviewed the updated research plans for the Risk of Adverse Health Effects Due to Alterations in Host-Microorganism Interactions (Host Microbe Risk) and the Risk of Performance Decrement and Crew Illness Due to an Inadequate Food System (Food Risk). The SRP also received a status update on the Risk of Adverse Health Effects of Exposure to Dust and Volatiles during Exploration of Celestial Bodies (Dust Risk). Overall, the SRP was impressed with the strong research plans presented by the scientists and staff associated with the SHFH Element. The SRP also thought that the updated research plans were thorough, well organized, and presented in a comprehensive manner. The SRP agrees with the changes made to the Host Microbe Risk and Food Risk portfolios and thinks that the targets for Gap closure are appropriate.
DOT National Transportation Integrated Search
2012-01-01
Traffic signal systems represent a substantial component of the highway transportation network in the United : States. It is challenging for most agencies to find engineering resources to properly update signal policies and : timing plans to accommod...
2014 Bone and Muscle Risks Standing Review Panel
NASA Technical Reports Server (NTRS)
Steinberg, Susan; Glowacki, Julie; Gregor, Robert; Cullen, Diane; Drake, Almond; Enoka, Roger; Hanley, Edward Jr.; Kraemer, William; Raven, Peter; Sumner, Rick, D.
2014-01-01
The 2014 Bone and Muscle Risks Standing Review Panel (from here on referred to as the SRP) met for a site visit in Houston, TX on December 17 - 18, 2014. The SRP reviewed the updated research plans for the Risk of Impaired Performance Due to Reduced Muscle Mass, Strength and Endurance (Muscle Risk) and the Risk of Reduced Physical Performance Capabilities Due to Reduced Aerobic Capacity (Aerobic Risk). The SRP also received a status update on the Risk of Bone Fracture (Bone Risk), the Risk of Early Onset Osteoporosis Due To Spaceflight (Osteo Risk), the Risk of Intervertebral Disc Damage (IVD Risk), and the Risk of Renal Stone Formation (Renal Risk).
Pre-Publication to the Planning for Natural Disaster Debris Guidance
EPA is requesting comment on the draft update of the Planning for Natural Disaster Debris Guidance, along with two other documents. This Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.
Integrated Extravehicular Activity Human Research Plan: 2017
NASA Technical Reports Server (NTRS)
Abercromby, Andrew
2017-01-01
Multiple organizations within NASA as well as industry and academia fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Human Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Human Research Plan will be conducted annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the preliminary Integrated EVA Human Research Plan are presented including description of ongoing and planned research activities in the areas of: physiological and performance capabilities; suit design parameters; EVA human health and performance modeling; EVA tasks and concepts of operations; EVA informatics; human-suit sensors; suit sizing and fit; and EVA injury risk and mitigation. This paper represents the 2017 update to the Integrated EVA Human Research Plan.
Eleventh Annual Report of Accomplishments Under the Airport Improvement Program
1992-01-01
552,860 INSTALL SECURITY SYSTEM PORTLAND INTERNATIONAL JETPORT (PRIMARY) 25 $255, 195 CONSTRUCT ACCESS ROAD PRESQUE ISLE 09 $988,548 CONSTRUCT AIRCRAFT...TAXIWAYS; INSTALL VISUAL APPROACH AIDS PENNSYLVANIA COMMONWEALTH OF PENNSYLVANIA S7 $89,050 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) DELAWARE...VALLEY REGION RA $195,030 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) SOUTHWESTERN PENNSYLVANIA REGION RA $310,950 CONDUCT REGIONAL SYSTEM PLAN
New Hampshire state rail plan 2001
DOT National Transportation Integrated Search
2001-04-01
This report is the 2001 update to the New Hampshire Statewide Rail Plan, which was last updated in 1991 and amended in 1993. The Rail Plan presents an overview of the current status of the New Hampshire Rail System, who operates it and how it is util...
2010 Strategic Plan for Autism Spectrum Disorder Research. NIH Publication No. 10-7573
ERIC Educational Resources Information Center
Interagency Autism Coordinating Committee, 2010
2010-01-01
In developing the 2010 Strategic Plan for ASD (Autism Spectrum Disorder) Research, the Interagency Autism Coordinating Committee (IACC) updated the previous Plan to highlight the most pressing research needs and opportunities for the field today. The Plan, which must be annually updated in accordance with the Combating Autism Act (CAA) of 2006,…
Building a Better Campus: An Update on Building Codes.
ERIC Educational Resources Information Center
Madden, Michael J.
2002-01-01
Discusses the implications for higher education institutions in terms of facility planning, design, construction, and renovation of the move from regionally-developed model-building codes to two international sets of codes. Also addresses the new performance-based design option within the codes. (EV)
Rapid motion compensation for prostate biopsy using GPU.
Shen, Feimo; Narayanan, Ramkrishnan; Suri, Jasjit S
2008-01-01
Image-guided procedures have become routine in medicine. Due to the nature of three-dimensional (3-D) structure of the target organs, two-dimensional (2-D) image acquisition is gradually being replaced by 3-D imaging. Specifically in the diagnosis of prostate cancer, biopsy can be performed using 3-D transrectal ultrasound (TRUS) image guidance. Because prostatic cancers are multifocal, it is crucial to accurately guide biopsy needles towards planned targets. Further the gland tends to move due to external physical disturbances, discomfort introduced by the procedure or intrinsic peristalsis. As a result the exact position of the gland must be rapidly updated so as to correspond with the originally acquired 3-D TRUS volume prior to biopsy planning. A graphics processing unit (GPU) is used in this study to compute rapid updates performing 3-D motion compensation via registration of the live 2-D image and the acquired 3-D TRUS volume. The parallel computational framework on the GPU is exploited resulting in mean compute times of 0.46 seconds for updating the position of a live 2-D buffer image containing 91,000 pixels. A 2x sub-sampling resulted in a further improvement to 0.19 seconds. With the increase in GPU multiprocessors and sub-sampling, we observe that real time motion compensation can be achieved.
75 FR 66114 - National Institute of Mental Health; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-27
... Strategic Plan Updating Process of the Interagency Autism Coordinating Committee (IACC). The purpose of the Subcommittee meeting is to plan the process for updating the IACC Strategic Plan for Autism Spectrum Disorder.... Name of Committee: Interagency Autism Coordinating Committee (IACC). Type of meeting: Subcommittee for...
75 FR 59731 - National Institute of Mental Health; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-28
... Strategic Plan Updating Process of the Interagency Autism Coordinating Committee (IACC). The purpose of the Subcommittee meeting is to plan the process for updating the IACC Strategic Plan for Autism Spectrum Disorder.... Name of Committee: Interagency Autism Coordinating Committee (IACC). Type of meeting: Subcommittee for...
EPA is requesting comment on the draft Planning for Natural Disaster Debris Guidance, and two other documents. The Guidance is an update of the Planning for Natural Disaster Debris guidance that EPA published in March 2008.
Multi-Criteria GIS Analyses with the Use of Uavs for the Needs of Spatial Planning
NASA Astrophysics Data System (ADS)
Zawieska, D.; Markiewicz, J.; Turek, A.; Bakuła, K.; Kowalczyk, M.; Kurczyński, Z.; Ostrowski, W.; Podlasiak, P.
2016-06-01
Utilization of Unmanned Aerial Systems (UAVs) in agriculture, forestry, or other environmental contexts has recently become common. However, in the case of spatial planning, the role of UAVs still seems to be underestimated. At present, sections of municipal development use UAVs mainly for promotional purposes (films, folders, brochures, etc.). The use of UAVs for spatial management provides results, first of all, in the form of savings in human resources and time; however, more frequently, it is also connected with financial savings (given the decreasing cost of UAVs and photogrammetric software). The performed research presented here relates to the possibilities of using UAVs to update planning documents, and, in particular, to update the study of conditions and directions of spatial management and preparation of local plans for physical management. Based on acquired photographs with a resolution of 3 cm, a cloud of points is generated, as well as 3D models and the true orthophotomap. These data allow multi-criteria spatial analyses. Additionally, directions of development and changes in physical management are analysed for the given area.
Eye movement sequence generation in humans: Motor or goal updating?
Quaia, Christian; Joiner, Wilsaan M.; FitzGibbon, Edmond J.; Optican, Lance M.; Smith, Maurice A.
2011-01-01
Saccadic eye movements are often grouped in pre-programmed sequences. The mechanism underlying the generation of each saccade in a sequence is currently poorly understood. Broadly speaking, two alternative schemes are possible: first, after each saccade the retinotopic location of the next target could be estimated, and an appropriate saccade could be generated. We call this the goal updating hypothesis. Alternatively, multiple motor plans could be pre-computed, and they could then be updated after each movement. We call this the motor updating hypothesis. We used McLaughlin’s intra-saccadic step paradigm to artificially create a condition under which these two hypotheses make discriminable predictions. We found that in human subjects, when sequences of two saccades are planned, the motor updating hypothesis predicts the landing position of the second saccade in two-saccade sequences much better than the goal updating hypothesis. This finding suggests that the human saccadic system is capable of executing sequences of saccades to multiple targets by planning multiple motor commands, which are then updated by serial subtraction of ongoing motor output. PMID:21191134
Manufacturing Methods and Technology Program Plan. Update.
1981-11-01
INDUSTRIAL BASE ENGINEERING ACTIVITY ROCK ISLAND. ILLINOIS 61299 82 INDEX PAGE I. INTRODUCTION The MMT Program Plan Update ........... 1 Industry Guide...obtained from that Plan, extra copies of which are available upon request from the Industrial Base Engineering Activity. Other sources for this data are...Major Subcommands (SUBMACOM’S). The SUBMACOM’S plan, formulate, budget, and execute individual projects. The Industrial Base Engineering Activity
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-25
... environment. Affected Federal, state, or local agencies, affected Indian tribes, and other interested private... Environmental Impact Statement for Update of the Shoreline Management Plan and Supplement to the Master Plan... intent. SUMMARY: The purpose of the Environmental Impact Statement (EIS) is to address alternatives and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-22
... maintenance plan update is for the Charlotte, Raleigh/Durham and Winston-Salem carbon monoxide (CO) maintenance areas. Specifically, the State submitted a limited maintenance plan update for CO, showing continued attainment of the 8-hour CO National Ambient Air Quality Standard for the Charlotte, Raleigh...
10 CFR 603.885 - Updated program plans and budgets.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Updated program plans and budgets. 603.885 Section 603.885... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision... effort and a revised budget if there is a significant change from the initial budget. ...
13 CFR 124.403 - How is a business plan updated and modified?
Code of Federal Regulations, 2010 CFR
2010-01-01
... incorporated into its business plan. The transition management strategy must describe: (1) How the Participant... business growth and promote profitable business operations after the expiration of its program term. (d... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false How is a business plan updated and...
Expert Meeting: Optimized Heating Systems Using Condensing Boilers and Baseboard Convectors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arena, L.
2013-01-01
On August 11, 2011, in Denver, CO, a Building America Expert Meeting was held in conjunction with the Building America Residential Energy Efficiency Technical Update Meeting, to review and discuss results and future plans for research to improve the performance of hydronic heating systems using condensing boilers and baseboard convectors. A meeting objective was to provide an opportunity for other Building America teams and industry experts to provide feedback and specific suggestions for the planned research.
Development of a shuttle recovery Commercial Materials Processing in Space (CMPS) program
NASA Technical Reports Server (NTRS)
1989-01-01
The work performed has covered the following tasks: update commercial users requirements; assess availability of carriers and facilities; shuttle availability assessment; development of optimum accommodations plan; and payload documentation requirements assessment. The results from the first four tasks are presented. To update commercial user requirements, contacts were made with the JEA and CCDS partners to obtain copies of their most recent official flight requests. From these requests the commercial partners' short and long range plans for flight dates, flight frequency, experiment hardware and carriers was determined. A 34 by 44 inch chart was completed to give a snapshot view of the progress of commercialization in space. Further, an assessment was made of the availability of carriers and facilities. Both existing carriers and those under development were identified for use by the commercial partners. A data base was compiled to show the capabilities of the carriers. A shuttle availability assessment was performed using the primary and secondary shuttle manifests released by NASA. Analysis of the manifest produced a flight-by-flight list of flight opportunities available to commercial users. Using inputs from the first three tasks, an Optimum Accommodations Plan was developed. The Accommodation Plan shows the commercial users manifested by flight, the experiment flown, the carrier used and complete list of commercial users that could not be manifested in each calendar year.
DOT National Transportation Integrated Search
2012-10-31
This document updates the Intelligent Transportation Systems Strategic Research Plan, 20102014, a focused research agenda whose goal is to deliver the foundational systems, technologies, and applications that provide transportation connectivity to...
An adaptive reentry guidance method considering the influence of blackout zone
NASA Astrophysics Data System (ADS)
Wu, Yu; Yao, Jianyao; Qu, Xiangju
2018-01-01
Reentry guidance has been researched as a popular topic because it is critical for a successful flight. In view that the existing guidance methods do not take into account the accumulated navigation error of Inertial Navigation System (INS) in the blackout zone, in this paper, an adaptive reentry guidance method is proposed to obtain the optimal reentry trajectory quickly with the target of minimum aerodynamic heating rate. The terminal error in position and attitude can be also reduced with the proposed method. In this method, the whole reentry guidance task is divided into two phases, i.e., the trajectory updating phase and the trajectory planning phase. In the first phase, the idea of model predictive control (MPC) is used, and the receding optimization procedure ensures the optimal trajectory in the next few seconds. In the trajectory planning phase, after the vehicle has flown out of the blackout zone, the optimal reentry trajectory is obtained by online planning to adapt to the navigation information. An effective swarm intelligence algorithm, i.e. pigeon inspired optimization (PIO) algorithm, is applied to obtain the optimal reentry trajectory in both of the two phases. Compared to the trajectory updating method, the proposed method can reduce the terminal error by about 30% considering both the position and attitude, especially, the terminal error of height has almost been eliminated. Besides, the PIO algorithm performs better than the particle swarm optimization (PSO) algorithm both in the trajectory updating phase and the trajectory planning phases.
Accomplishments Under the Airport Improvement Program. Fiscal year 1987.
1987-01-01
APRON PORTLAND INTERNATIONAL JETPORT (PRIMARY) 17 $312,300 INSTALL RUNWAY LIGHTING SYSTEM 1B $1,481,738 EXTENDAPRON PRESQUE ISLE 06 $99,000 RECONSTRUCT...LOCATION AND PROJECT FEDERAL NAME OF AIRPORT NUMBER FUNDS DESCRIPTION OF WORK o PENNSYLVANIA S4 $198,000 CONDUCT STATE SYSTEM PLAN UPDATE COMMONWEALTH...OF PENNSYLVANIA (CONTINUOUS) (SYSTEM PLAN) R5 $200,000 CONDUCT REGIONAL SYSTEM PLAN UPDATE DELAWARE VALLEY REGION (CONTINUOUS) (SYSTEM PLAN) RS
25 CFR 170.414 - How is the tribal long-range transportation plan used and updated?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false How is the tribal long-range transportation plan used and updated? 170.414 Section 170.414 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...
Updating Human Factors Engineering Guidelines for Conducting Safety Reviews of Nuclear Power Plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
O, J.M.; Higgins, J.; Stephen Fleger - NRC
The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodicmore » update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. This paper describes the role of HFE guidelines in the safety review process and the content of the key HFE guidelines used. Then we will present the methodology used to develop HFE guidance and update these documents, and describe the current status of the update program.« less
Task Decomposition Module For Telerobot Trajectory Generation
NASA Astrophysics Data System (ADS)
Wavering, Albert J.; Lumia, Ron
1988-10-01
A major consideration in the design of trajectory generation software for a Flight Telerobotic Servicer (FTS) is that the FTS will be called upon to perform tasks which require a diverse range of manipulator behaviors and capabilities. In a hierarchical control system where tasks are decomposed into simpler and simpler subtasks, the task decomposition module which performs trajectory planning and execution should therefore be able to accommodate a wide range of algorithms. In some cases, it will be desirable to plan a trajectory for an entire motion before manipulator motion commences, as when optimizing over the entire trajectory. Many FTS motions, however, will be highly sensory-interactive, such as moving to attain a desired position relative to a non-stationary object whose position is periodically updated by a vision system. In this case, the time-varying nature of the trajectory may be handled either by frequent replanning using updated sensor information, or by using an algorithm which creates a less specific state-dependent plan that determines the manipulator path as the trajectory is executed (rather than a priori). This paper discusses a number of trajectory generation techniques from these categories and how they may be implemented in a task decompo-sition module of a hierarchical control system. The structure, function, and interfaces of the proposed trajectory gener-ation module are briefly described, followed by several examples of how different algorithms may be performed by the module. The proposed task decomposition module provides a logical structure for trajectory planning and execution, and supports a large number of published trajectory generation techniques.
NASA Technical Reports Server (NTRS)
Hamilton, M. H.
1971-01-01
The data links for use with the guidance system operations plan for manned command module earth orbital and lunar missions using program Colossus 3 are presented. The subjects discussed are: (1) digital uplink to CMC, (2) command module contiguous block update, (3) CMC retrofire external data update, (4) CMC digital downlink, and (5) CMC entry update.
Updating Rhode Island’s Strategic Highway Safety Plan (SHSP) : an RSPCB Peer Exchange
DOT National Transportation Integrated Search
2012-03-01
In January 2012, Rhode Island kicked off its Strategic Highway Safety Plan (SHSP) update with a leadership committee meeting where key safety stakeholders presented an overview of Rhode Islands accomplishments since initial SHSP approval in 2007. ...
Navigation for the new millennium: Autonomous navigation for Deep Space 1
NASA Technical Reports Server (NTRS)
Reidel, J. E.; Bhaskaran, S.; Synnott, S. P.; Desai, S. D.; Bollman, W. E.; Dumont, P. J.; Halsell, C. A.; Han, D.; Kennedy, B. M.; Null, G. W.;
1997-01-01
The autonomous optical navigation system technology for the Deep Space 1 (DS1) mission is reported on. The DS1 navigation system will be the first to use autonomous navigation in deep space. The systems tasks are to: perform interplanetary cruise orbit determination using images of distant asteroids; control and maintain the orbit of the spacecraft with an ion propulsion system and conventional thrusters, and perform late knowledge updates of target position during close flybys in order to facilitate high quality data return from asteroid MaAuliffe and comet West-Kohoutek-Ikemura. To accomplish these tasks, the following functions are required: picture planning; image processing; dynamical modeling and integration; planetary ephemeris and star catalog handling; orbit determination; data filtering and estimation; maneuver estimation, and spacecraft ephemeris updating. These systems and functions are described and preliminary performance data are presented.
Space transportation booster engine configuration study. Addendum: Design definition document
NASA Technical Reports Server (NTRS)
1989-01-01
Gas generator engine characteristics and results of engine configuration refinements are discussed. Updated component mechanical design, performance, and manufacturing information is provided. The results are also provided of ocean recovery studies and various engine integration tasks. The details are provided of the maintenance plan for the Space Transportation Booster Engine.
EPA Cape Cod 208 Plan 2015 Update Approval Letter
EPA approval letter re: certification by the Governor of MA that the Cape Cod WQM Plan Update is consistent with CWA section 208(b)(3) & accepted the Commonwealth’s reaffirmation of the existing designations of Cape Cod Towns as waste management agencies.
Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-11-01
This is the November 2014 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.
Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2015-03-01
This is the March 2015 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.
ERIC Educational Resources Information Center
Florida State Univ., Tallahassee. Learning Systems Inst.
This publication contains the first two of three training workshop manuals designed to be used in conducting an update of the Indonesian Education and Human Resources Sector Assessment. Workshop I covers the basic concepts, skills, and methods needed to design subsector updates and develop a draft plan for update activities. Workshops II and III…
Radiometric calibration updates to the Landsat collection
Micijevic, Esad; Haque, Md. Obaidul; Mishra, Nischal
2016-01-01
The Landsat Project is planning to implement a new collection management strategy for Landsat products generated at the U.S. Geological Survey (USGS) Earth Resources Observation and Science (EROS) Center. The goal of the initiative is to identify a collection of consistently geolocated and radiometrically calibrated images across the entire Landsat archive that is readily suitable for time-series analyses. In order to perform an accurate land change analysis, the data from all Landsat sensors must be on the same radiometric scale. Landsat 7 Enhanced Thematic Mapper Plus (ETM+) is calibrated to a radiance standard and all previous sensors are cross-calibrated to its radiometric scale. Landsat 8 Operational Land Imager (OLI) is calibrated to both radiance and reflectance standards independently. The Landsat 8 OLI reflectance calibration is considered to be most accurate. To improve radiometric calibration accuracy of historical data, Landsat 1-7 sensors also need to be cross-calibrated to the OLI reflectance scale. Results of that effort, as well as other calibration updates including the absolute and relative radiometric calibration and saturated pixel replacement for Landsat 8 OLI and absolute calibration for Landsat 4 and 5 Thematic Mappers (TM), will be implemented into Landsat products during the archive reprocessing campaign planned within the new collection management strategy. This paper reports on the planned radiometric calibration updates to the solar reflective bands of the new Landsat collection.
2014 Report on the Milestones for the US National Plan to Address Alzheimer's Disease.
Fargo, Keith N; Aisen, Paul; Albert, Marilyn; Au, Rhoda; Corrada, Maria M; DeKosky, Steven; Drachman, David; Fillit, Howard; Gitlin, Laura; Haas, Magali; Herrup, Karl; Kawas, Claudia; Khachaturian, Ara S; Khachaturian, Zaven S; Klunk, William; Knopman, David; Kukull, Walter A; Lamb, Bruce; Logsdon, Rebecca G; Maruff, Paul; Mesulam, Marsel; Mobley, William; Mohs, Richard; Morgan, David; Nixon, Ralph A; Paul, Steven; Petersen, Ronald; Plassman, Brenda; Potter, William; Reiman, Eric; Reisberg, Barry; Sano, Mary; Schindler, Rachel; Schneider, Lon S; Snyder, Peter J; Sperling, Reisa A; Yaffe, Kristine; Bain, Lisa J; Thies, William H; Carrillo, Maria C
2014-10-01
With increasing numbers of people with Alzheimer's and other dementias across the globe, many countries have developed national plans to deal with the resulting challenges. In the United States, the National Alzheimer's Project Act, signed into law in 2011, required the creation of such a plan with annual updates thereafter. Pursuant to this, the US Department of Health and Human Services (HHS) released the National Plan to Address Alzheimer's Disease in 2012, including an ambitious research goal of preventing and effectively treating Alzheimer's disease by 2025. To guide investments, activities, and the measurement of progress toward achieving this 2025 goal, in its first annual plan update (2013) HHS also incorporated into the plan a set of short, medium and long-term milestones. HHS further committed to updating these milestones on an ongoing basis to account for progress and setbacks, and emerging opportunities and obstacles. To assist HHS as it updates these milestones, the Alzheimer's Association convened a National Plan Milestone Workgroup consisting of scientific experts representing all areas of Alzheimer's and dementia research. The workgroup evaluated each milestone and made recommendations to ensure that they collectively constitute an adequate work plan for reaching the goal of preventing and effectively treating Alzheimer's by 2025. This report presents these Workgroup recommendations. Copyright © 2014 The Alzheimer's Association. Published by Elsevier Inc. All rights reserved.
Hosaka, Ryosuke; Nakajima, Toshi; Aihara, Kazuyuki; Yamaguchi, Yoko; Mushiake, Hajime
2016-08-01
The medial motor areas play crucial but flexible roles in the temporal organizations of multiple movements. The beta oscillation of local field potentials is the predominant oscillatory activity in the motor areas, but the manner in which increases and decreases in beta power contribute to updating of multiple action plans is not yet fully understood. In the present study, beta and high-gamma activities in the supplementary motor area (SMA) and pre-SMA of monkeys were analyzed during performance of a bimanual motor sequence task that required updating and maintenance of the memory of action sequences. Beta power was attenuated during early delay periods of updating trials but was increased during maintenance trials, while there was a reciprocal increase in high-gamma power during updating trials. Moreover, transient attenuation of beta power during maintenance trials resulted in the erroneous selection of an action sequence. Therefore, it was concluded that the suppression of beta power during the early delay period reflects volatility of neural representation of the action sequence. This neural representation would be properly updated to the appropriate instructed action sequence via increases in high-gamma power in updating trials whereas it would be erroneously updated without the appropriate updating signal in maintenance trials. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.
Energy Systems Integration Facility (ESIF) Facility Stewardship Plan: Revision 2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Torres, Juan; Anderson, Art
The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-ft2 research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan provides DOE and other decision makers with information about the existing and expected capabilities of the ESIF and the expected performance metrics to be applied to ESIF operations.more » This plan is a living document that will be updated and refined throughout the lifetime of the facility.« less
Preparing for the Update of New Hampshire's Strategic Highway Safety Plan : An RSPCB Peer Exchange
DOT National Transportation Integrated Search
2011-05-01
This report provides a summary of a peer exchange sponsored by the New Hampshire Department of Transportation (NHDOT) that focused on updating New Hampshires Strategic Highway Safety Plan (SHSP) and establishing a Toward Zero Deaths (TZD) initiati...
Report of Accomplishments under the Airport Improvement Program.
1982-09-30
Acquire snow removal equipment; conduct City of Portland feasibility study. Portland International (PRIMARY) Presque Isle 01 $ 15,840 Airport Master Plan...update to terminal City of Presque Isle area plan). Northern Maine Regional (PRIMARY) Presque Isle 02 $ 118,869 Rehabilitate terminal access road...City of Presque Isle Northern Maine Regional (PRIMARY) Rockland 01 $ 40,252 Airport Master Plan (update). Knox County Knox County Regional (COMMERCIAL
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Approval of the State Medicaid HIT plan, the HIT... Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... Requirements Specific to the Medicaid Program § 495.344 Approval of the State Medicaid HIT plan, the HIT PAPD...
The Voronoi spatio-temporal data structure
NASA Astrophysics Data System (ADS)
Mioc, Darka
2002-04-01
Current GIS models cannot integrate the temporal dimension of spatial data easily. Indeed, current GISs do not support incremental (local) addition and deletion of spatial objects, and they can not support the temporal evolution of spatial data. Spatio-temporal facilities would be very useful in many GIS applications: harvesting and forest planning, cadastre, urban and regional planning, and emergency planning. The spatio-temporal model that can overcome these problems is based on a topological model---the Voronoi data structure. Voronoi diagrams are irregular tessellations of space, that adapt to spatial objects and therefore they are a synthesis of raster and vector spatial data models. The main advantage of the Voronoi data structure is its local and sequential map updates, which allows us to automatically record each event and performed map updates within the system. These map updates are executed through map construction commands that are composed of atomic actions (geometric algorithms for addition, deletion, and motion of spatial objects) on the dynamic Voronoi data structure. The formalization of map commands led to the development of a spatial language comprising a set of atomic operations or constructs on spatial primitives (points and lines), powerful enough to define the complex operations. This resulted in a new formal model for spatio-temporal change representation, where each update is uniquely characterized by the numbers of newly created and inactivated Voronoi regions. This is used for the extension of the model towards the hierarchical Voronoi data structure. In this model, spatio-temporal changes induced by map updates are preserved in a hierarchical data structure that combines events and corresponding changes in topology. This hierarchical Voronoi data structure has an implicit time ordering of events visible through changes in topology, and it is equivalent to an event structure that can support temporal data without precise temporal information. This formal model of spatio-temporal change representation is currently applied to retroactive map updates and visualization of map evolution. It offers new possibilities in the domains of temporal GIS, transaction processing, spatio-temporal queries, spatio-temporal analysis, map animation and map visualization.
18 CFR 12.24 - Review and updating of plans.
Code of Federal Regulations, 2010 CFR
2010-04-01
... light of any significant changes in upstream or downstream circumstances which might affect water flows... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Review and updating of plans. 12.24 Section 12.24 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
18 CFR 12.24 - Review and updating of plans.
Code of Federal Regulations, 2012 CFR
2012-04-01
... light of any significant changes in upstream or downstream circumstances which might affect water flows... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Review and updating of plans. 12.24 Section 12.24 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
18 CFR 12.24 - Review and updating of plans.
Code of Federal Regulations, 2011 CFR
2011-04-01
... light of any significant changes in upstream or downstream circumstances which might affect water flows... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Review and updating of plans. 12.24 Section 12.24 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
18 CFR 12.24 - Review and updating of plans.
Code of Federal Regulations, 2014 CFR
2014-04-01
... light of any significant changes in upstream or downstream circumstances which might affect water flows... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Review and updating of plans. 12.24 Section 12.24 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
18 CFR 12.24 - Review and updating of plans.
Code of Federal Regulations, 2013 CFR
2013-04-01
... light of any significant changes in upstream or downstream circumstances which might affect water flows... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Review and updating of plans. 12.24 Section 12.24 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...
Contemporary Technologies...3...An Updated Plan for NIACC's Future.
ERIC Educational Resources Information Center
Hecht, Alfred R.; And Others
An update is provided on North Iowa Area Community College's (NIACC's) progress toward achieving its goals with respect to the use of contemporary technologies, along with plans for further progress. Part I examines the characteristics of contemporary technology and provides information on NIACC's Contemporary Technology Strategic Planning…
75 FR 38757 - Approval and Promulgation of Implementation Plans; State of Iowa
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
... Plan (SIP). The purpose of this revision is to update the Polk County Board of Health Rules and Regulations, Chapter V, ``Air Pollution.'' These revisions reflect updates to the Iowa statewide rules... local agency's ``Air Pollution'' rules. DATES: Comments on this proposed action must be received in...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-15
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OAR-2007-0268; FRL-9833-5] Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed guidance; extension of comment period. SUMMARY: The U.S...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-15
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OAR-2007-0268; FRL-9707-2] Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of document availability for interim use and public...
Performance Plan: Progress Report, 1st Quarter, Fiscal Year 2000.
ERIC Educational Resources Information Center
Department of Education, Washington, DC. Student Financial Assistance.
This report by the Department of Education examines the progress made by the Student Financial Assistance (SFA) program in reaching its objectives. The report notes that for objective 1, customer satisfaction, more than 4 million direct loan records have been processed and over 1 million updates applied since winter 1999; that 84 percent of school…
Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Management
The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less
Hommel, Bernhard; Kray, Jutta; Lindenberger, Ulman
2010-01-01
Humans integrate the features of perceived events and of action plans into episodic event files. Here we investigated whether children (9–10 years), younger adults (20–31 years), and older adults (64–76 years) differ in the flexibility of managing (updating) event files. Relative to young adults, performance in children and older adults was more hampered by partial mismatches between present and previous stimulus–response relations, suggesting less efficient updating of episodic stimulus–response representations in childhood and old age. Results are discussed in relation to changes in cortical neurochemistry during maturation and senescence. PMID:22053159
Pilot production & commercialization of LAPPD ™
DOE Office of Scientific and Technical Information (OSTI.GOV)
Minot, Michael J.; Bennis, Daniel C.; Bond, Justin L.
We present a progress update on plans to establish pilot production and commercialization of Large Area (400 cm2) Picosecond Photodetector (LAPPD™). Steps being taken to commercialize this MCP and LAPPD™ technology and begin tile pilot production are presented including (1) the manufacture of 203 mm×203 mm borosilicate glass capillary arrays (GCAs), (2) optimization of MCP performance and creation of an ALD coating facility to manufacture MCPs and (3) design, construction and commissioning of UHV tile integration and sealing facility to produce LAPPDs. Taken together these plans provide a “pathway toward commercialization”.
Kennedy Space Center Director Update
2014-03-06
CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. Attendees talk with Trey Carlson, Kennedy Master Planner, at the Center Planning and Development Directorate, or CPDD, display. In the background is Mario Busacca, chief of CPDD’s Spaceport Planning Office. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper
NASA Astrophysics Data System (ADS)
Pearlman, Michael R.; Ma, Chopo; Neilan, Ruth; Noll, Carey; Pavlis, Erricos; Saunier, Jérôme; Schoene, Tilo; Barzaghi, Riccardo; Thaller, Daniela; Bergstrand, Sten; Mueller, Juergen
2017-04-01
Working with the IAG geometric services (VLBI, SLR, GNSS, and DORIS) the Bureau continues to advocate for the expansion and upgrade of the space geodesy networks for the maintenance and improvement of the reference frame and other application, and for the extension and integration with other techniques. New sites are being established following the GGOS concept of "core" and co-location sites; new technologies are being implemented to enhance performance in data yield as well as accuracy. In particular, several groups are undertaking initiatives and seeking partnerships to update existing sites and expand the networks in geographic areas void of coverage. The Bureau continues to meet with organizations to discuss possibilities of new and expanded participation and to promote the concept of partnerships. The Bureau provides the opportunity for representatives from the services to meet and share progress and plans, and to discuss issues of common interest. The Bureau monitors the status and projects the evolution of the network based on information from the current and expected future participants. Of particular interest at the moment is the integration of gravity and tide gauge networks. The Committees and Joint Working Groups play an essential role in the Bureau activity. The Standing Committee on Performance Simulations and Architectural Trade-off (PLATO) uses simulation and analysis techniques to project future network capability and to examine trade-off options. The Committee on Data and Information is working on a strategy for a GGOS metadata system on a near term plan for data products and a more comprehensive longer-term plan for an all-inclusive system. The Committee on Satellite Missions is working to enhance communication with the space missions, to advocate for missions that support GGOS goals and to enhance ground systems support. The IERS Working Group on Site Survey and Co-location (also participating in the Bureau) is working to enhance standardization in procedures, outreach and to encourage new survey groups to participate, and improve procedures to determine systems reference points. The 2017-2018 Implementation Plan for the GGOS Bureau of Networks and Observations has been posted on the GGOS website. We will outline progress over the past two years and discuss the status of the network and updated plan.
Higher Intelligence Is Associated with Less Task-Related Brain Network Reconfiguration
Cole, Michael W.
2016-01-01
The human brain is able to exceed modern computers on multiple computational demands (e.g., language, planning) using a small fraction of the energy. The mystery of how the brain can be so efficient is compounded by recent evidence that all brain regions are constantly active as they interact in so-called resting-state networks (RSNs). To investigate the brain's ability to process complex cognitive demands efficiently, we compared functional connectivity (FC) during rest and multiple highly distinct tasks. We found previously that RSNs are present during a wide variety of tasks and that tasks only minimally modify FC patterns throughout the brain. Here, we tested the hypothesis that, although subtle, these task-evoked FC updates from rest nonetheless contribute strongly to behavioral performance. One might expect that larger changes in FC reflect optimization of networks for the task at hand, improving behavioral performance. Alternatively, smaller changes in FC could reflect optimization for efficient (i.e., small) network updates, reducing processing demands to improve behavioral performance. We found across three task domains that high-performing individuals exhibited more efficient brain connectivity updates in the form of smaller changes in functional network architecture between rest and task. These smaller changes suggest that individuals with an optimized intrinsic network configuration for domain-general task performance experience more efficient network updates generally. Confirming this, network update efficiency correlated with general intelligence. The brain's reconfiguration efficiency therefore appears to be a key feature contributing to both its network dynamics and general cognitive ability. SIGNIFICANCE STATEMENT The brain's network configuration varies based on current task demands. For example, functional brain connections are organized in one way when one is resting quietly but in another way if one is asked to make a decision. We found that the efficiency of these updates in brain network organization is positively related to general intelligence, the ability to perform a wide variety of cognitively challenging tasks well. Specifically, we found that brain network configuration at rest was already closer to a wide variety of task configurations in intelligent individuals. This suggests that the ability to modify network connectivity efficiently when task demands change is a hallmark of high intelligence. PMID:27535904
ENGINEERED BARRIER SYSTEM: PHYSICAL AND CHEMICAL ENVIRONMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. Jarek
2005-08-29
The purpose of this model report is to describe the evolution of the physical and chemical environmental conditions within the waste emplacement drifts of the repository, including the drip shield and waste package surfaces. The resulting seepage evaporation and gas abstraction models are used in the total system performance assessment for the license application (TSPA-LA) to assess the performance of the engineered barrier system and the waste form. This report develops and documents a set of abstraction-level models that describe the engineered barrier system physical and chemical environment. Where possible, these models use information directly from other reports as input,more » which promotes integration among process models used for TSPA-LA. Specific tasks and activities of modeling the physical and chemical environment are included in ''Technical Work Plan for: Near-Field Environment and Transport In-Drift Geochemistry Model Report Integration'' (BSC 2005 [DIRS 173782], Section 1.2.2). As described in the technical work plan, the development of this report is coordinated with the development of other engineered barrier system reports. To be consistent with other project documents that address features, events, and processes (FEPs), Table 6.14.1 of the current report includes updates to FEP numbers and FEP subjects for two FEPs identified in the technical work plan (TWP) governing this report (BSC 2005 [DIRS 173782]). FEP 2.1.09.06.0A (Reduction-oxidation potential in EBS), as listed in Table 2 of the TWP (BSC 2005 [DIRS 173782]), has been updated in the current report to FEP 2.1.09.06.0B (Reduction-oxidation potential in Drifts; see Table 6.14-1). FEP 2.1.09.07.0A (Reaction kinetics in EBS), as listed in Table 2 of the TWP (BSC 2005 [DIRS 173782]), has been updated in the current report to FEP 2.1.09.07.0B (Reaction kinetics in Drifts; see Table 6.14-1). These deviations from the TWP are justified because they improve integration with FEPs documents. The updates have no impact on the model developed in this report.« less
2016-02-01
In addition , the parser updates some parameters based on uncertainties. For example, Analytica was very slow to update Pk values based on...moderate range. The additional security environments helped to fill gaps in lower severity. Weapons Effectiveness Pk values were modified to account for two...project is to help improve the value and character of defense resource planning in an era of growing uncertainty and complex strategic challenges
NASA Earth Science Update with Information Science Technology
NASA Technical Reports Server (NTRS)
Halem, Milton
2000-01-01
This viewgraph presentation gives an overview of NASA earth science updates with information science technology. Details are given on NASA/Earth Science Enterprise (ESE)/Goddard Space Flight Center strategic plans, ESE missions and flight programs, roles of information science, ESE goals related to the Minority University-Space Interdisciplinary Network, and future plans.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-25
... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Proposed Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Update Water Quality Criteria for pH AGENCY: Delaware River... public hearing to receive comments on proposed amendments to the Commission's Water Quality Regulations...
ERIC Educational Resources Information Center
Schleich, Ley, Ed.
This document contains the first six research updates to "Alaska's Adolescents: A Plan for the Future," a comprehensive 1994 report on adolescent health issues prepared by the multiagency Alaska Adolescent Health Advisory Committee. "The Media and Adolescent Health: Television's Impact on Certain Teen Behaviors" (Elizabeth…
California Master Plan for Special Education--An Update.
ERIC Educational Resources Information Center
Pillsbury, Charles A.; Maitland, Anne M.
The report updates aspects of the 1977 report on California's Master Plan for Special Education. Reasons are sought for the intense debate over state funding for special education, which has substantially increased over recent years while special education enrollments have increased only modestly. In visits to nearly 100 local education agencies,…
Postsecondary Transition under IDEA 2004: A Legal Update
ERIC Educational Resources Information Center
Prince, Angela M. T.; Katsiyannis, Antonis; Farmer, Jennie
2013-01-01
Postsecondary transition planning for students with disabilities first entered the Individuals with Disabilities Education Act (IDEA) in 1990. The required provisions for transition planning were updated with the amendments to IDEA in 1997 and its reauthorization in 2004. Since IDEA 2004 took effect in July 2005, 11 court cases have been decided…
Further Automate Planned Cluster Maintenance to Minimize System Downtime during Maintenance Windows
DOE Office of Scientific and Technical Information (OSTI.GOV)
Springmeyer, R.
This report documents the integration and testing of the automated update process of compute clusters in LC to minimize impact to user productivity. Description: A set of scripts will be written and deployed to further standardize cluster maintenance activities and minimize downtime during planned maintenance windows. Completion Criteria: When the scripts have been deployed and used during planned maintenance windows and a timing comparison is completed between the existing process and the new more automated process, this milestone is complete. This milestone was completed on Aug 23, 2016 on the new CTS1 cluster called Jade when a request to upgrademore » the version of TOSS 3 was initiated while SWL jobs and normal user jobs were running. Jobs that were running when the update to the system began continued to run to completion. New jobs on the cluster started on the new release of TOSS 3. No system administrator action was required. Current update procedures in TOSS 2 begin by killing all users jobs. Then all diskfull nodes are updated, which can take a few hours. Only after the updates are applied are all nodes are rebooted, and then finally put back into service. A system administrator is required for all steps. In terms of human time spent during a cluster OS update, the TOSS 3 automated procedure on Jade took 0 FTE hours. Doing the same update without the Toss Update Tool would have required 4 FTE hours.« less
A switching cost for motor planning
Lefèvre, Philippe
2016-01-01
Movement planning consists of choosing the intended endpoint of the movement and selecting the motor program that will bring the effector on the endpoint. It is widely accepted that movement endpoint is updated on a trial-by-trial basis with respect to the observed errors and that the motor program for a given movement follows the rules of optimal feedback control. In this article, we show clear limitations of these theories. First, participants in the current study could not tune their motor program appropriately for each individual trial. This was true even when the participants selected the width of the target that they reached toward or when they had learned the appropriate motor program previously. These data are compatible with the existence of a switching cost for motor planning, which relates to the drop in performance due to an imposed switch of motor programs. This cost of switching shares many features of costs reported in cognitive task switching experiments and, when tested in the same participants, was correlated with it. Second, we found that randomly changing the width of a target over the course of a reaching experiment prevents the motor system from updating the endpoint of movements on the basis of the performance on the previous trial if the width of the target has changed. These results provide new insights into the process of motor planning and how it relates to optimal control theory and to an action selection based on the reward consequences of the motor program rather than that based on the observed error. PMID:27655964
A switching cost for motor planning.
Orban de Xivry, Jean-Jacques; Lefèvre, Philippe
2016-12-01
Movement planning consists of choosing the intended endpoint of the movement and selecting the motor program that will bring the effector on the endpoint. It is widely accepted that movement endpoint is updated on a trial-by-trial basis with respect to the observed errors and that the motor program for a given movement follows the rules of optimal feedback control. In this article, we show clear limitations of these theories. First, participants in the current study could not tune their motor program appropriately for each individual trial. This was true even when the participants selected the width of the target that they reached toward or when they had learned the appropriate motor program previously. These data are compatible with the existence of a switching cost for motor planning, which relates to the drop in performance due to an imposed switch of motor programs. This cost of switching shares many features of costs reported in cognitive task switching experiments and, when tested in the same participants, was correlated with it. Second, we found that randomly changing the width of a target over the course of a reaching experiment prevents the motor system from updating the endpoint of movements on the basis of the performance on the previous trial if the width of the target has changed. These results provide new insights into the process of motor planning and how it relates to optimal control theory and to an action selection based on the reward consequences of the motor program rather than that based on the observed error. Copyright © 2016 the American Physiological Society.
Code of Federal Regulations, 2010 CFR
2010-10-01
... voluntary residency reduction plan. (5) Updates to annual and cumulative targets (i) Except as provided in... paragraphs (g)(2) and (g)(3) of this section. (ii) An entity may update annual reduction targets specified in... used for direct GME payments for the last residency training year in which a qualifying entity...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-14
... update the air quality modeling in the San Joaquin Valley 8-Hour Ozone SIP by December 31, 2014. DATES... modeling in the San Joaquin Valley 8-Hour Ozone SIP to reflect emissions inventory improvements and any...) * * * (396) * * * (ii) * * * (A) * * * (2) * * * (ii) Commitment to update the air quality modeling in the...
Future of America's Forests and Rangelands: Update to the 2010 Resources Planning Act Assessment
Forest Service U.S. Department of Agriculture
2016-01-01
The Update to the 2010 Resources Planning Act (RPA) Assessment summarizes findings about the status, trends, and projected future of forests, rangelands, wildlife, biodiversity, water, outdoor recreation, and urban forests, as well as the effects of climate change upon these resources. Varying assumptions about population and economic growth, land use change, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-06
... Ecology (Ecology) submitted its Regional Haze State Implementation Plan (SIP) on December 22, 2010 to meet... Ecology submitted an update to the SIP submittal containing a revised and updated BART determination for... organized as follows: I. What is the background for this final action? Ecology submitted its Regional Haze...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2056-049] Xcel Energy; Notice of Application of Recreational Resources Management Plan Update for the St. Anthony Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the...
Spatial Coverage Planning for a Planetary Rover
NASA Technical Reports Server (NTRS)
Gaines, Daniel M.; Estlin, Tara; Chouinard, Caroline
2008-01-01
We are developing onboard planning and execution technologies to support the exploration and characterization of geological features by autonomous rovers. In order to generate high quality mission plans, an autonomous rover must reason about the relative importance of the observations it can perform. In this paper we look at the scientific criteria of selecting observations that improve the quality of the area covered by samples. Our approach makes use of a priori information, if available, and allows scientists to mark sub-regions of the area with relative priorities for exploration. We use an efficient algorithm for prioritizing observations based on spatial coverage that allows the system to update observation rankings as new information is gained during execution.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Updates. 68.190 Section 68.190 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.190 Updates. (a) The owner or operator shall...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Updates. 68.190 Section 68.190 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.190 Updates. (a) The owner or operator shall...
Planning activity for internally generated reward goals in monkey amygdala neurons
Schultz, Wolfram
2015-01-01
The best rewards are often distant and can only be achieved by planning and decision-making over several steps. We designed a multi-step choice task in which monkeys followed internal plans to save rewards towards self-defined goals. During this self-controlled behavior, amygdala neurons showed future-oriented activity that reflected the animal’s plan to obtain specific rewards several trials ahead. This prospective activity encoded crucial components of the animal’s plan, including value and length of the planned choice sequence. It began on initial trials when a plan would be formed, reappeared step-by-step until reward receipt, and readily updated with a new sequence. It predicted performance, including errors, and typically disappeared during instructed behavior. Such prospective activity could underlie the formation and pursuit of internal plans characteristic for goal-directed behavior. The existence of neuronal planning activity in the amygdala suggests an important role for this structure in guiding behavior towards internally generated, distant goals. PMID:25622146
DOE Office of Scientific and Technical Information (OSTI.GOV)
KIRKBRIDE, R.A.
The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.
Guide to good practices for operations and administration updates through required reading
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-12-01
This Guide to Good Practices is written to enhance understanding of, and provide direction for, Required Reading, Chapter XIV of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing programs for updating personnel with operations and administration information through required reading. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Required Reading is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a coordinated requiredmore » reading program to promote safe and efficient operations.« less
NASA Astrophysics Data System (ADS)
Pedras, Celestina Maria G.; Neto Paixão, Helena Maria; Lança, Rui; Soares, Cristina; Silva, Elisa; Granja Martins, Fernando Miguel
2015-04-01
This study aims to develop a methodology to streamline the process of data acquisition on land cover in the municipality of S. Brás de Alportel, Portugal. The collected information allows the updating of the Forestry Fire Defense Municipal Plan (PMDFCI). This plan identifies the most vulnerable areas and priorities of action, concerning the prevention. Regarding the update of the PMDFCI, the study area was characterized in 2013. As this information is dynamic, it should be updated periodically, which is challenging, given the lack of human resources and the available technology. On the other hand, the obtained data detail and accuracy are directly related to the qualification of the operator and the complexity of the study area. However, data updating is crucial for the operationally of the PMDFCI. Currently, the data update of the land's occupation and use in this municipality is primarily made through field work, followed by their update in the cartography at the office, supported by the Algarve Forest Planning Regional Plan (PROF Algarve). The use of aerial images obtained from an Unmanned Aerial Vehicle (UAV) in the Northwest area of S. Brás de Alportel and its classification with a supervised methodology, will allow the discrimination of the land cover classes in a more expeditious manner. This result when compared with the information collected through field work, will allow to verify the precision of the obtained information, aiming the use of the proposed methodology in the rest of the country.
VCE testbed program planning and definition study
NASA Technical Reports Server (NTRS)
Westmoreland, J. S.; Godston, J.
1978-01-01
The flight definition of the Variable Stream Control Engine (VSCE) was updated to reflect design improvements in the two key components: (1) the low emissions duct burner, and (2) the coannular exhaust nozzle. The testbed design was defined and plans for the overall program were formulated. The effect of these improvements was evaluated for performance, emissions, noise, weight, and length. For experimental large scale testing of the duct burner and coannular nozzle, a design definition of the VCE testbed configuration was made. This included selecting the core engine, determining instrumentation requirements, and selecting the test facilities, in addition to defining control system and assembly requirements. Plans for a comprehensive test program to demonstrate the duct burner and nozzle technologies were formulated. The plans include both aeroacoustic and emissions testing.
NASA Technical Reports Server (NTRS)
Chien, Steve; Knight, Russell; Stechert, Andre; Sherwood, Rob; Rabideau, Gregg
1998-01-01
An autonomous spacecraft must balance long-term and short-term considerations. It must perform purposeful activities that ensure long-term science and engineering goals are achieved and ensure that it maintains positive resource margins. This requires planning in advance to avoid a series of shortsighted decisions that can lead to failure, However, it must also respond in a timely fashion to a somewhat dynamic and unpredictable environment. Thus, spacecraft plans must often be modified due to fortuitous events such as early completion of observations and setbacks such as failure to acquire a guidestar for a science observation. This paper describes the use of iterative repair to support continuous modification and updating of a current working plan in light of changing operating context.
An Interim Update to the 2035 Socioeconomic and Travel Demand Forecasts for Virginia
DOT National Transportation Integrated Search
2012-10-01
In support of the update to Virginias 2035 Statewide Multimodal Plan, this report provides an update to select : socioeconomic forecasts initially made in 2009 based on a review of data from national sources and the literature. Mobility : needs ex...
An interim update to the 2035 socioeconomic and travel demand forecasts for Virginia.
DOT National Transportation Integrated Search
2012-09-01
"In support of the update to Virginias 2035 Statewide Multimodal Plan, this report provides an update to select : socioeconomic forecasts initially made in 2009 based on a review of data from national sources and the literature. Mobility : needs e...
An interim update to the 2035 socioeconomic and travel demand forecasts for Virginia.
DOT National Transportation Integrated Search
2012-10-01
In support of the update to Virginias 2035 Statewide Multimodal Plan, this report provides an update to select : socioeconomic forecasts initially made in 2009 based on a review of data from national sources and the literature. Mobility : needs ex...
78 FR 6289 - Sunshine Act Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-30
... COMMISSION ON CIVIL RIGHTS Sunshine Act Notice AGENCY: United States Commission on Civil Rights.... Program Planning Update on the Sex Trafficking: A Gender-Based Violation of Civil Rights briefing Update on the Federal Civil Rights Engagement with Arab & Muslim Communities Post 9/11 briefing Update on...
An exploratory study of healthcare strategic planning in two metropolitan areas.
Begun, James W; Kaissi, Amer A
2005-01-01
Little is known about empirical variation in the extent to which healthcare organizations conduct formal strategic planning or the extent to which strategic planning affects performance. Structural contingency and complexity science theory offer differing interpretations of the value of strategic planning. Structural contingency theory emphasizes adaptation to achieve organizational fit with a changing environment and views strategic planning as a way to chart the organization's path. Complexity science argues that planning is largely futile in changing environments. Interviews of leaders in 20 healthcare organizations in the metropolitan areas of Minneapolis/St. Paul, Minnesota, and San Antonio, Texas, reveal that strategic planning is a common and valued function in healthcare organizations. Respondents emphasized the need to continuously update strategic plans, involve physicians and the governing board, and integrate strategic plans with other organizational plans. Most leaders expressed that strategic planning contributes to organizational focus, fosters stakeholder participation and commitment, and leads to achievement of strategic goals. Because the widespread belief in strategic planning is based largely on experience, intuition, and faith, we present recommendations for developing an evidence base for healthcare strategic planning.
Code of Federal Regulations, 2014 CFR
2014-10-01
... reduction plan. (5) Updates to annual and cumulative targets (i) Except as provided in paragraph (g)(5)(ii...)(2) and (g)(3) of this section. (ii) An entity may update annual reduction targets specified in its... used for direct GME payments for the last residency training year in which a qualifying entity...
DOT National Transportation Integrated Search
2009-10-01
On November 4, 2009, ITDs Office of Highway Operations and Safety partnered with the FHWA Office of Safety to host a one-day peer exchange. This event focused on the update of Idahos Strategic Highway Safety Plan (SHSP), entitled Toward Zero...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2778-062] Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2055-087] Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available...
2007-01-25
the joint staff (J-6) and the intelligence directorate of a joint staff (J-2). The joint restricted frequency list (JRFL) is prepared and promulgated...J-3, and J-6, prepares a joint restricted frequency list (JRFL) for approval by the J-3 (through the information operations [IO] cell or equivalent...SPECTRUM MANAGEMENT PLAN DEGRADATION REPORTS ASSESS FREQUENCY PLAN EFFECTIVENESS UPDATE ASSIGNMENTS UPDATE JOINT RESTRICTED FREQUENCY LIST (JRFL
Ashley E. Askew; J.M. Bowker; Donald B.K. English; Stanley J. Zarnoch; Gary T. Green
2017-01-01
The outdoor recreation component of the 2010 Resources Planning Act (RPA) Assessment provided projections and modeling of participation and intensity by activity. Results provided insight into the future of multiple outdoor recreation activities through projections of participation rates, numbers of participants, days per participant, and total activity days. These...
75 FR 71669 - Sunshine Act Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-24
.... Approval of Agenda. II. Program Planning. Approval of School Choice, the Blaine Amendments and Anti.... Update on FY 2011 Cy Pres Enforcement Report. Update on Status of Briefing on Disparate Impact in School Discipline Policies. Update on Sex Discrimination in Liberal Arts College Admissions--Some of the discussion...
76 FR 24922 - National Science Board; Sunshine Act Meetings; Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-03
... CTAM Camp Update on Outreach Activities Committee on Audit and Oversight (A&O) Open Session 9 a.m.-10... Transmittal Inspector General's Update FY 2011 Financial Statement Audit Chief Financial Officer's Update... CEH STEM Education Priority ``Action Items'' Strategic Planning for the NSF Education Portfolio...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelly, Elizabeth J.; Stone, Timothy Amos; Smith, Paul Herrick
The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.”This 2017 update reflects changes to the surveillance plan resulting from surveillance findings as documented in Reeves et al. 2016. These findings include observations of corrosion in SAVY and Hagan containers and the indication (in one SAVY container) of possible filter membrane thermal degradation. This surveillance plan update documents the rationale for selecting surveillance containers, specifiesmore » the containers for 2017 surveillance, and identifies a minimum set of containers for 2018 surveillance. This update contains important changes to the previous surveillance plans.« less
Updated preparedness and response framework for influenza pandemics.
Holloway, Rachel; Rasmussen, Sonja A; Zaza, Stephanie; Cox, Nancy J; Jernigan, Daniel B
2014-09-26
The complexities of planning for and responding to the emergence of novel influenza viruses emphasize the need for systematic frameworks to describe the progression of the event; weigh the risk of emergence and potential public health impact; evaluate transmissibility, antiviral resistance, and severity; and make decisions about interventions. On the basis of experience from recent influenza responses, CDC has updated its framework to describe influenza pandemic progression using six intervals (two prepandemic and four pandemic intervals) and eight domains. This updated framework can be used for influenza pandemic planning and serves as recommendations for risk assessment, decision-making, and action in the United States. The updated framework replaces the U.S. federal government stages from the 2006 implementation plan for the National Strategy for Pandemic Influenza (US Homeland Security Council. National strategy for pandemic influenza: implementation plan. Washington, DC: US Homeland Security Council; 2006. Available at http://www.flu.gov/planning-preparedness/federal/pandemic-influenza-implementation.pdf). The six intervals of the updated framework are as follows: 1) investigation of cases of novel influenza, 2) recognition of increased potential for ongoing transmission, 3) initiation of a pandemic wave, 4) acceleration of a pandemic wave, 5) deceleration of a pandemic wave, and 6) preparation for future pandemic waves. The following eight domains are used to organize response efforts within each interval: incident management, surveillance and epidemiology, laboratory, community mitigation, medical care and countermeasures, vaccine, risk communications, and state/local coordination. Compared with the previous U.S. government stages, this updated framework provides greater detail and clarity regarding the potential timing of key decisions and actions aimed at slowing the spread and mitigating the impact of an emerging pandemic. Use of this updated framework is anticipated to improve pandemic preparedness and response in the United States. Activities and decisions during a response are event-specific. These intervals serve as a reference for public health decision-making by federal, state, and local health authorities in the United States during an influenza pandemic and are not meant to be prescriptive or comprehensive. This framework incorporates information from newly developed tools for pandemic planning and response, including the Influenza Risk Assessment Tool and the Pandemic Severity Assessment Framework, and has been aligned with the pandemic phases restructured in 2013 by the World Health Organization.
2016 Annual Technology Baseline (ATB)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cole, Wesley; Kurup, Parthiv; Hand, Maureen
Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), National Renewable Energy Laboratory provides an organized and centralized dataset that was reviewed by internal and external experts. It uses the best information from the Department of Energy laboratory's renewable energy analysts and Energy Information Administration information for conventional technologies. The ATB will be updated annually in order to provide an up-to-date repository of current and future cost and performance data. Going forward, we plan to revise and refine the values usingmore » best available information. The ATB includes both a presentation with notes (PDF) and an associated Excel Workbook. The ATB includes the following electricity generation technologies: land-based wind; offshore wind; utility-scale solar PV; concentrating solar power; geothermal power; hydropower plants (upgrades to existing facilities, powering non-powered dams, and new stream-reach development); conventional coal; coal with carbon capture and sequestration; integrated gasification combined cycle coal; natural gas combustion turbines; natural gas combined cycle; conventional biopower. Nuclear laboratory's renewable energy analysts and Energy Information Administration information for conventional technologies. The ATB will be updated annually in order to provide an up-to-date repository of current and future cost and performance data. Going forward, we plan to revise and refine the values using best available information.« less
Dynamic replanning on demand of UAS constellations performing ISR missions
NASA Astrophysics Data System (ADS)
Stouch, Daniel W.; Zeidman, Ernest; Callahan, William; McGraw, Kirk
2011-05-01
Unmanned aerial systems (UAS) have proven themselves to be indispensable in providing intelligence, surveillance, and reconnaissance (ISR) over the battlefield. Constellations of heterogeneous, multi-purpose UAS are being tasked to provide ISR in an unpredictable environment. This necessitates the dynamic replanning of critical missions as weather conditions change, new observation targets are identified, aircraft are lost or equipment malfunctions, and new airspace restrictions are introduced. We present a method to generate coordinated mission plans for constellations of UAS with multiple flight goals and potentially competing objectives, and update them on demand as the operational situation changes. We use a fast evolutionary algorithm-based, multi-objective optimization technique. The updated flight routes maintain continuity by considering where the ISR assets have already flown and where they still need to go. Both the initial planning and replanning take into account factors such as area of analysis coverage, restricted operating zones, maximum control station range, adverse weather effects, military terrain value, and sensor performance. Our results demonstrate that by constraining the space of potential solutions using an intelligently-formed air maneuver network with a subset of potential airspace corridors and navigational waypoints, we can ensure global optimization for multiple objectives considering the situation both before and after the replanning is initiated. We employ sophisticated visualization techniques using a geographic information system to help the user 'look under the hood" of the algorithms to understand the effectiveness and viability of the generated ISR mission plans and identify potential gaps in coverage.
Vermont long range transportation plan
DOT National Transportation Integrated Search
2002-01-01
Vermont Agency of Transportation (VTrans) conducted this update of the Long-Range Transportation Plan to review and revise the recommendations of the Long-Range Transportation Plan of 1995. The three objectives from the previous plan were further ref...
ERIC Educational Resources Information Center
Mount San Antonio Coll., Walnut, CA.
This update of the 1998 Plan for the 21st Century was designed to augment the California Community College Family and Consumer Sciences in the 21st Century packet, produced in 1996. It summarizes a variety of activities, products and events that have taken place over the past two years, and suggests resources and contacts for learning more about…
Lougheed, M Diane; Lemiere, Catherine; Ducharme, Francine M; Licskai, Chris; Dell, Sharon D; Rowe, Brian H; FitzGerald, Mark; Leigh, Richard; Watson, Wade; Boulet, Louis-Philippe
2012-01-01
BACKGROUND: In 2010, the Canadian Thoracic Society (CTS) published a Consensus Summary for the diagnosis and management of asthma in children six years of age and older, and adults, including an updated Asthma Management Continuum. The CTS Asthma Clinical Assembly subsequently began a formal clinical practice guideline update process, focusing, in this first iteration, on topics of controversy and/or gaps in the previous guidelines. METHODS: Four clinical questions were identified as a focus for the updated guideline: the role of noninvasive measurements of airway inflammation for the adjustment of anti-inflammatory therapy; the initiation of adjunct therapy to inhaled corticosteroids (ICS) for uncontrolled asthma; the role of a single inhaler of an ICS/long-acting beta2-agonist combination as a reliever, and as a reliever and a controller; and the escalation of controller medication for acute loss of asthma control as part of a self-management action plan. The expert panel followed an adaptation process to identify and appraise existing guidelines on the specified topics. In addition, literature searches were performed to identify relevant systematic reviews and randomized controlled trials. The panel formally assessed and graded the evidence, and made 34 recommendations. RESULTS: The updated guideline recommendations outline a role for inclusion of assessment of sputum eosinophils, in addition to standard measures of asthma control, to guide adjustment of controller therapy in adults with moderate to severe asthma. Appraisal of the evidence regarding which adjunct controller therapy to add to ICS and at what ICS dose to begin adjunct therapy in children and adults with poor asthma control supported the 2010 CTS Consensus Summary recommendations. New recommendations for the adjustment of controller medication within written action plans are provided. Finally, priority areas for future research were identified. CONCLUSIONS: The present clinical practice guideline is the first update of the CTS Asthma Guidelines following the Canadian Respiratory Guidelines Committee’s new guideline development process. Tools and strategies to support guideline implementation will be developed and the CTS will continue to regularly provide updates reflecting new evidence. PMID:22536582
Arkansas statewide long-range intermodal transportation plan 2007 update
DOT National Transportation Integrated Search
2007-01-01
This Arkansas Statewide Long-Range Intermodal Transportation Plan (2007 Long- Range Plan) is the third long-range plan approved by the Arkansas Highway Commission. The first plan was approved in February 1995 followed by the second document in May 20...
76 FR 45786 - Advanced Scientific Computing Advisory Committee; Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-01
... updates. EU Data Initiative. HPC & EERE Wind Program. Early Career Research on Energy Efficient Interconnect for Exascale Computing. Separating Algorithm and Implentation. Update on ASCR exascale planning...
Guo, Yuqi; Sims, Omar T
2017-02-17
Hepatitis C virus (HCV) kills 366,000 people worldwide and 17,000 people in the United States each year. In 2011, the U.S. Department of Health and Human Services (HHS) published a national viral hepatitis action plan to control and combat HCV in the United States. This article provides a brief update of HCV health policy developments that have emerged since publication of HHS's national viral hepatitis action plan and concludes with a discussion of the public health impact of these recent HCV health policy developments.
49 CFR 1544.301 - Contingency plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COMMERCIAL OPERATORS Threat and Threat Response § 1544.301 Contingency plan. Each aircraft operator must... that all information contained in the plan is updated annually and that appropriate persons are...
DOT National Transportation Integrated Search
1999-12-01
Montana first developed a rest area plan in 1985; however, that plan no longer adequately sported decisions related to longe-range policy issues. Hence this docment represents a comprehensive effort to update rest area planning for Montana. A three p...
77 FR 4370 - NASA Advisory Council; Science Committee; Astrophysics Subcommittee; Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-27
... persons, scientific and technical information relevant to program planning. DATES: Thursday, February 23... topics: --Astrophysics Division Update --Update on Balloons Return to Flight Changes --James Webb Space...
International Space Station (ISS) Plasma Contactor Unit (PCU) Utilization Plan Assessment Update
NASA Technical Reports Server (NTRS)
Hernandez-Pellerano, Amri; Iannello, Christopher J.; Wollack, Edward J.; Wright, Kenneth H.; Garrett, Henry B.; Ging, Andrew T.; Katz, Ira; Keith, R. Lloyd; Minow, Joseph I.; Willis, Emily M.;
2014-01-01
The NASA Engineering and Safety Center (NESC) received a request to support the Assessment of the International Space Station (ISS) Plasma Contactor Unit (PCU) Utilization Update. The NESC conducted an earlier assessment of the use of the PCU in 2009. This document contains the outcome of the assessment update.
DOE Office of Scientific and Technical Information (OSTI.GOV)
BEVINS, R.R.
This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operationsmore » input or engineering judgment.« less
LST phase A design update study
NASA Technical Reports Server (NTRS)
1973-01-01
An update is presented of the Phase A study of the Large Space Telescope (LST), based on changes in guidelines and new data developed subsequent to the Phase A study. The study defines an LST concept based on the broad mission guidelines provided by the Office of Space Science (OSS), the scientific requirements developed by OSS with the scientific community, and an understanding of long range NASA planning current at the time the study was performed. A low cost design approach was followed. This resulted in the use of standard spacecraft hardware, the provision for maintenance at the black box level, growth potential in systems designs, and sharing of shuttle maintenance flights with other payloads (See N73-18449 through N73-18453)
40 CFR 130.6 - Water quality management plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...
LEPCs and Deliberate Releases: Addressing Terrorist Activities in the Local Emergency Plan
This fact sheet discusses how local emergency planning committees (LEPCs) can incorporate counter-terrorism issues when they review and update their local plans. Builds on the National Response Team's Hazardous Materials Emergency Planning Guide.
Mining moving object trajectories in location-based services for spatio-temporal database update
NASA Astrophysics Data System (ADS)
Guo, Danhuai; Cui, Weihong
2008-10-01
Advances in wireless transmission and mobile technology applied to LBS (Location-based Services) flood us with amounts of moving objects data. Vast amounts of gathered data from position sensors of mobile phones, PDAs, or vehicles hide interesting and valuable knowledge and describe the behavior of moving objects. The correlation between temporal moving patterns of moving objects and geo-feature spatio-temporal attribute was ignored, and the value of spatio-temporal trajectory data was not fully exploited too. Urban expanding or frequent town plan change bring about a large amount of outdated or imprecise data in spatial database of LBS, and they cannot be updated timely and efficiently by manual processing. In this paper we introduce a data mining approach to movement pattern extraction of moving objects, build a model to describe the relationship between movement patterns of LBS mobile objects and their environment, and put up with a spatio-temporal database update strategy in LBS database based on trajectories spatiotemporal mining. Experimental evaluation reveals excellent performance of the proposed model and strategy. Our original contribution include formulation of model of interaction between trajectory and its environment, design of spatio-temporal database update strategy based on moving objects data mining, and the experimental application of spatio-temporal database update by mining moving objects trajectories.
78 FR 56871 - Environmental Management Site-Specific Advisory Board, Portsmouth
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-16
... Register. DATES: Wednesday, October 2, 2013, 6:00 p.m. ADDRESSES: Ohio State University, Endeavor Center...] Annual Executive Planning and Leadership Training Session Update Subcommittee Updates Election of Chair...
News and Updates from Proctor Creek
This page contains news and updates from the Proctor Creek Urban Waters Partnership location. They span ongoing projects, programs, and initiatives that this Atlanta-based partnership is taking on in its work plan.
33 CFR 385.34 - Changes to the Plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the Plan; (2) The estimated cost of the Plan, including any approved changes to the Plan; (3) A water... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Changes to the Plan. 385.34... Information Into the Plan § 385.34 Changes to the Plan. (a) The Plan shall be updated to incorporate approved...
33 CFR 385.34 - Changes to the Plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the Plan; (2) The estimated cost of the Plan, including any approved changes to the Plan; (3) A water... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Changes to the Plan. 385.34... Information Into the Plan § 385.34 Changes to the Plan. (a) The Plan shall be updated to incorporate approved...
33 CFR 385.34 - Changes to the Plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the Plan; (2) The estimated cost of the Plan, including any approved changes to the Plan; (3) A water... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Changes to the Plan. 385.34... Information Into the Plan § 385.34 Changes to the Plan. (a) The Plan shall be updated to incorporate approved...
33 CFR 385.34 - Changes to the Plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the Plan; (2) The estimated cost of the Plan, including any approved changes to the Plan; (3) A water... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Changes to the Plan. 385.34... Information Into the Plan § 385.34 Changes to the Plan. (a) The Plan shall be updated to incorporate approved...
33 CFR 385.34 - Changes to the Plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the Plan; (2) The estimated cost of the Plan, including any approved changes to the Plan; (3) A water... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Changes to the Plan. 385.34... Information Into the Plan § 385.34 Changes to the Plan. (a) The Plan shall be updated to incorporate approved...
Annual update of data for estimating ESALs.
DOT National Transportation Integrated Search
2006-10-01
A revised procedure for estimating equivalent single axleloads (ESALs) was developed in 1985. This procedure used weight, classification, and traffic volume data collected by the Transportation Cabinet's Division of Planning. : Annual updates of data...
78 FR 69657 - Environmental Management Site-Specific Advisory Board, Portsmouth
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-20
... Register. DATES: Thursday, December 5, 2013, 6:00 p.m. ADDRESSES: Ohio State University, Endeavor Center...] Annual Executive Planning and Leadership Training Session Update [cir] EM National Chairs Meeting Update...
CIRSS vertical data integration, San Bernardino study
NASA Technical Reports Server (NTRS)
Hodson, W.; Christenson, J.; Michel, R. (Principal Investigator)
1982-01-01
The creation and use of a vertically integrated data base, including LANDSAT data, for local planning purposes in a portion of San Bernardino County, California are described. The project illustrates that a vertically integrated approach can benefit local users, can be used to identify and rectify discrepancies in various data sources, and that the LANDSAT component can be effectively used to identify change, perform initial capability/suitability modeling, update existing data, and refine existing data in a geographic information system. Local analyses were developed which produced data of value to planners in the San Bernardino County Planning Department and the San Bernardino National Forest staff.
Access 5 - Step 1: Human Systems Integration Program Plan (HSIPP)
NASA Technical Reports Server (NTRS)
2005-01-01
This report describes the Human System Interface (HSI) analysis, design and test activities that will be performed to support the development of requirements and design guidelines to facilitate the incorporation of High Altitude Long Endurance (HALE) Remotely Operated Aircraft (ROA) at or above FL400 in the National Airspace System (NAS). These activities are required to support the design and development of safe, effective and reliable ROA operator and ATC interfaces. This plan focuses on the activities to be completed for Step 1 of the ACCESS 5 program. Updates to this document will be made for each of the four ACCESS 5 program steps.
ERIC Educational Resources Information Center
College Store Journal, 1979
1979-01-01
Topics discussed by the NACS Store Planning/Renovation Committees in this updated version of the college store renovation manual include: short- and long-range planning, financial considerations, professional planning assistance, the store's image and business character, location considerations, building requirements, space requirements, fixtures,…
Louisiana Airport System Plan.
DOT National Transportation Integrated Search
1992-10-01
This report is a non-technical summary of the update to the Louisiana Airport System Plan. The system plan identifies the location, service level, and role of the 81 airports included in the plan and the costs to develop individual airports and the a...
Annual update of data for estimating ESALs : draft.
DOT National Transportation Integrated Search
2008-10-01
A revised procedure for estimating equivalent single axleloads (ESALs) was developed in 1985. This procedure used weight, classification, and traffic volume data collected by the Transportation Cabinet's Division of Planning. : Annual updates of data...
NASA's Planetary Aeolian Laboratory: Status and Update
NASA Astrophysics Data System (ADS)
Williams, D. A.; Smith, J. K.
2017-05-01
This presentation provides a status update on the operational capabilities and funding plans by NASA for the Planetary Aeolian Laboratory located at NASA Ames Research Center, including details for those proposing future wind tunnel experiments.
International Earth Science Constellations (ESC) Introduction
NASA Technical Reports Server (NTRS)
Guit, William J.
2016-01-01
This presentation will discuss NASA HQ perspective, current state of the mission, Landsat 7 and Terra exit plans, long term plans for all mission, CARA updates, Spring 2016 IAM series plans and current status, CCS future release plans, and results of covariance calculation meetings.
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
Updating the transportation plans in Virginia's small urban areas.
DOT National Transportation Integrated Search
1987-01-01
The Transportation Planning Division (TPD) of the Virginia Department of Transportation is responsible for developing transportation plans for areas in the state having a population greater than 3,500. Although transportation forecasting procedures f...
DOT National Transportation Integrated Search
2015-03-12
Initial Workshop-I held on September 18, 2014 at the Volpe Center - Overview of DOT GPS Adjacent Band Compatibility Assessment Plan and plans/timeline for implementation - Presentation on GPS use cases and list of representative GPS receivers - Descr...
Annual Plan - Fiscal Year 2009
Includes Strategic Plan Update and Draft Plans for Oversight of the American Recovery and Reinvestment Act of 2009 Based Upon the Enterprise Risk Management Integrated Framework Model Developed by the Committee of Sponsoring Orgs of the Treadway Commission
2015 Dust Risk Standing Review Panel
NASA Technical Reports Server (NTRS)
Steinberg, Susan
2015-01-01
The 2015 Dust Risk Standing Review Panel (SRP) participated in a WebEx/teleconference with members of the Space Human Factors and Habitability (SHFH) Element, representatives from the Human Research Program (HRP), NASA Headquarters, and the NASA Research Education and Support Services on November 12, 2015. The SRP reviewed the updated Evidence Report for The Risk of Adverse Health and Performance Effects of Celestial Dust Exposure, as well as the Research Plan for this Risk.
Radioisotope Power Systems Reference Book for Mission Designers and Planners
NASA Technical Reports Server (NTRS)
Lee, Young; Bairstow, Brian
2015-01-01
The RPS Program's Program Planning and Assessment (PPA) Office commissioned the Mission Analysis team to develop the Radioisotope Power Systems (RPS) Reference Book for Mission Planners and Designers to define a baseline of RPS technology capabilities with specific emphasis on performance parameters and technology readiness. The main objective of this book is to provide RPS technology information that could be utilized by future mission concept studies and concurrent engineering practices. A progress summary from the major branches of RPS technology research provides mission analysis teams with a vital tool for assessing the RPS trade space, and provides concurrent engineering centers with a consistent set of guidelines for RPS performance characteristics. This book will be iterated when substantial new information becomes available to ensure continued relevance, serving as one of the cornerstone products of the RPS PPA Office. This book updates the original 2011 internal document, using data from the relevant publicly released RPS technology references and consultations with RPS technologists. Each performance parameter and RPS product subsection has been reviewed and cleared by at least one subject matter representative. A virtual workshop was held to reach consensus on the scope and contents of the book, and the definitions and assumptions that should be used. The subject matter experts then reviewed and updated the appropriate sections of the book. The RPS Mission Analysis Team then performed further updates and crosschecked the book for consistency. Finally, a second virtual workshop was held to ensure all subject matter experts and stakeholders concurred on the contents.
NASA Astrophysics Data System (ADS)
Gibbs, Matthew S.; McInerney, David; Humphrey, Greer; Thyer, Mark A.; Maier, Holger R.; Dandy, Graeme C.; Kavetski, Dmitri
2018-02-01
Monthly to seasonal streamflow forecasts provide useful information for a range of water resource management and planning applications. This work focuses on improving such forecasts by considering the following two aspects: (1) state updating to force the models to match observations from the start of the forecast period, and (2) selection of a shorter calibration period that is more representative of the forecast period, compared to a longer calibration period traditionally used. The analysis is undertaken in the context of using streamflow forecasts for environmental flow water management of an open channel drainage network in southern Australia. Forecasts of monthly streamflow are obtained using a conceptual rainfall-runoff model combined with a post-processor error model for uncertainty analysis. This model set-up is applied to two catchments, one with stronger evidence of non-stationarity than the other. A range of metrics are used to assess different aspects of predictive performance, including reliability, sharpness, bias and accuracy. The results indicate that, for most scenarios and metrics, state updating improves predictive performance for both observed rainfall and forecast rainfall sources. Using the shorter calibration period also improves predictive performance, particularly for the catchment with stronger evidence of non-stationarity. The results highlight that a traditional approach of using a long calibration period can degrade predictive performance when there is evidence of non-stationarity. The techniques presented can form the basis for operational monthly streamflow forecasting systems and provide support for environmental decision-making.
Updating Rhode Island’s strategic highway safety plan (SHSP).
DOT National Transportation Integrated Search
2012-05-01
This report summarizes the peer exchange sponsored by the Rhode Island Department of Transportation (RIDOT) that focused on Rhode Islands SHSP update. Rhode Islands goals for the peer exchange included learning from other States experiences ...
77 FR 3750 - U.S. Air Force Academy Board of Visitors Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
... a meeting in Harmon Hall at the United States Air Force Academy in Colorado Springs, Colorado on 10... Academy Athletic Corporation Transition Plan Update; Character Update; Focus Group (Gold Bar Lieutenants...
Machine learning in updating predictive models of planning and scheduling transportation projects
DOT National Transportation Integrated Search
1997-01-01
A method combining machine learning and regression analysis to automatically and intelligently update predictive models used in the Kansas Department of Transportations (KDOTs) internal management system is presented. The predictive models used...
Kennedy Space Center Director Update
2014-03-06
CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. From left, Scott Thurston, Kennedy deputy of the spacecraft office of the Commercial Crew Program, talks with Scott Colloredo, director of the Center Planning and Development Directorate. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper
Ecological Census Techniques - 2nd Edition
NASA Astrophysics Data System (ADS)
Sutherland, Edited By William J.
2006-08-01
This is an updated version of the best selling first edition, Ecological Census Techniques, with updating, some new chapters and authors. Almost all ecological and conservation work involves carrying out a census or survey. This practically focussed book describes how to plan a census, the practical details and shows with worked examples how to analyse the results. The first three chapters describe planning, sampling and the basic theory necessary for carrying out a census. In the subsequent chapters international experts describe the appropriate methods for counting plants, insects, fish, amphibians, reptiles, mammals and birds. As many censuses also relate the results to environmental variability, there is a chapter explaining the main methods. Finally, there is a list of the most common mistakes encountered when carrying out a census. Gives worked examples and describes practical details The chapter on research planning provides an approach for planning any research, not just those relating to census techniques Latest edition of a very highly-regarded book. Includes new authors, each chapter has been updated, and additional chapters on sampling and designing research programmes have been added
78 FR 7476 - Airport Improvement Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-01
... of Airport Planning and Programming, Financial Assistance Division has updated and significantly.... San Martin, Manager, Airports Financial Assistance Division, Office of Airport Planning and... Airports, Airport Planning and Programming, Routing Symbol APP-501, 800 Independence Avenue SW., Room 619...
2004-12-01
plover. These birds nest on barren sandbars close to the water surface downstream from the Gavins Point Dam on the Missouri National Recreational...nest on the barren sand and gravel beaches of the Great Gavins Point Dam/Lewis and Clark Lake Master Plan Update...Nebraska. The four Iowa counties (Pottawattamie, Plymouth , Sioux, Woodbury) within the primary market area had a population of 248,019, which contributed
Adaptation of clinical prediction models for application in local settings.
Kappen, Teus H; Vergouwe, Yvonne; van Klei, Wilton A; van Wolfswinkel, Leo; Kalkman, Cor J; Moons, Karel G M
2012-01-01
When planning to use a validated prediction model in new patients, adequate performance is not guaranteed. For example, changes in clinical practice over time or a different case mix than the original validation population may result in inaccurate risk predictions. To demonstrate how clinical information can direct updating a prediction model and development of a strategy for handling missing predictor values in clinical practice. A previously derived and validated prediction model for postoperative nausea and vomiting was updated using a data set of 1847 patients. The update consisted of 1) changing the definition of an existing predictor, 2) reestimating the regression coefficient of a predictor, and 3) adding a new predictor to the model. The updated model was then validated in a new series of 3822 patients. Furthermore, several imputation models were considered to handle real-time missing values, so that possible missing predictor values could be anticipated during actual model use. Differences in clinical practice between our local population and the original derivation population guided the update strategy of the prediction model. The predictive accuracy of the updated model was better (c statistic, 0.68; calibration slope, 1.0) than the original model (c statistic, 0.62; calibration slope, 0.57). Inclusion of logistical variables in the imputation models, besides observed patient characteristics, contributed to a strategy to deal with missing predictor values at the time of risk calculation. Extensive knowledge of local, clinical processes provides crucial information to guide the process of adapting a prediction model to new clinical practices.
DOE Office of Scientific and Technical Information (OSTI.GOV)
BEVINS, R.R.
This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated duringmore » the second phase of the W314 Project to cover the second phase of the project's scope.« less
2014 Space Human Factors Engineering Standing Review Panel
NASA Technical Reports Server (NTRS)
Steinberg, Susan
2014-01-01
The 2014 Space Human Factors Engineering (SHFE) Standing Review Panel (from here on referred to as the SRP) participated in a WebEx/teleconference with members of the Space Human Factors and Habitability (SHFH) Element, representatives from the Human Research Program (HRP), the National Space Biomedical Research Institute (NSBRI), and NASA Headquarters on November 17, 2014 (list of participants is in Section XI of this report). The SRP reviewed the updated research plans for the Risk of Incompatible Vehicle/Habitat Design (HAB Risk) and the Risk of Performance Errors Due to Training Deficiencies (Train Risk). The SRP also received a status update on the Risk of Inadequate Critical Task Design (Task Risk), the Risk of Inadequate Design of Human and Automation/Robotic Integration (HARI Risk), and the Risk of Inadequate Human-Computer Interaction (HCI Risk).
Revised research plan for the U.S. Climate Change Science Program
DOT National Transportation Integrated Search
2008-05-01
The U.S. Climate Change Science Program (CCSP) released its Strategic Plan in 2003.This Revised Research Plan, in compliance with Section 104(a) of the Global Change Research Act of 1990, is an update to the 2003 Strategic Plan. It reflects both scie...
48 CFR 970.5226-1 - Diversity plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... clause: Diversity Plan (DEC 2000) The Contractor shall submit a Diversity Plan to the Contracting Officer... appropriate). The Contractor shall submit an update to its Plan annually or with its annual fee proposal... innovative strategies for increasing opportunities to fully use the talents and capabilities of a diverse...
78 FR 60099 - Nontank Vessel Response Plans and Other Response Plan Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-30
... Convention for the Prevention of Pollution From Ships MEPC Marine Environment Protection Committee NAICS... vessels to prepare and submit oil spill response plans. The Federal Water Pollution Control Act defines.... Additionally, this final rule updates the international Shipboard Oil Pollution Emergency Plan requirements...
Short-range transit plan for the Phoenix urbanized area : fiscal years 1982-1986
DOT National Transportation Integrated Search
1981-07-21
Report presents the FY 1980-81 update of the Phoenix, Arizona, urbanized area Short Range Transit Plan. It describes a five-year plan to guide improvements of the public transportation sytem. Planning aspects of the report will be incorporated into t...
40 CFR 75.62 - Monitoring plan submittals.
Code of Federal Regulations, 2010 CFR
2010-07-01
... representative for an affected unit shall submit a complete, electronic, up-to-date monitoring plan file (except... quarterly report for a reporting quarter where an update of the electronic monitoring plan information is... associated, pursuant to § 75.53(b). Electronic submittal of all monitoring plan information, including...
77 FR 25686 - Malcolm Baldrige National Quality Award Board of Overseers and Panel of Judges
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-01
..., Baldrige Enterprise Update, Judges Panel Update, Baldrige Fellows Program Discussion, and Strategic Planning. DATES: The meeting will convene on Thursday, June 14, 2012, at 8:30 a.m. Eastern time and adjourn...
The 2002 review of Florida's twenty-five long range transportation plans
DOT National Transportation Integrated Search
2002-08-01
Florida's 25 metropolitan planning organization (MPO) long range transportation plans (LRTPs) were reviewed. Each MPO had completed at least one update cycle since the initial review in 1997. Additionally, federal transportation legislation added a f...
Atmospheric release model for the E-area low-level waste facility: Updates and modifications
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The atmospheric release model (ARM) utilizes GoldSim® Monte Carlo simulation software (GTG, 2017) to evaluate the flux of gaseous radionuclides as they volatilize from E-Area disposal facility waste zones, diffuse into the air-filled soil pores surrounding the waste, and emanate at the land surface. This report documents the updates and modifications to the ARM for the next planned E-Area PA considering recommendations from the 2015 PA strategic planning team outlined by Butcher and Phifer.
LANDFIRE 2001 and 2008 Refresh Geographic Area Report--Pacific Southwest
Bastion, Henry; Long, Don; Lundberg, Brenda; Kost, Jay; Natharius, Jeffrey A.; Kreilick, Heather; Martin, Charley; Smail, Tobin; Napoli, James; Hann, Wendel
2011-01-01
In this report, we (1) address the background and provide details pertaining to why there are two Refresh data sets, (2) explain the requirements, planning, and procedures behind the completion and delivery of the updated products for each of the data product sets, (3) show and describe results, and (4) provide case studies illustrating the performance of LANDFIRE National, LANDFIRE 2001 Refresh and LANDFIRE 2008 Refresh (LF_1.1.0) data products on some example wildland fires.
Designing of network planning system for small-scale manufacturing
NASA Astrophysics Data System (ADS)
Kapulin, D. V.; Russkikh, P. A.; Vinnichenko, M. V.
2018-05-01
The paper presents features of network planning in small-scale discrete production. The procedure of explosion of the production order, considering multilevel representation, is developed. The software architecture is offered. Approbation of the network planning system is carried out. This system allows carrying out dynamic updating of the production plan.
Planning Systems. SPEC Kit 13.
ERIC Educational Resources Information Center
Association of Research Libraries, Washington, DC. Office of Management Studies.
This kit on planning systems updates a 1974 Management Studies Office Systems and Procedures Exchange Center (SPEC) kit in which developments in planning activities among Association of Research Libraries (ARL) were reviewed. At the time of the original study, in 1972, planning techniques and systems were a subject of much interest because rising…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-23
... Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards Revision AGENCY... Illinois state implementation plan (SIP) to reflect current National Ambient Air Quality Standards (NAAQS... Implementation Plan at 35 Illinois Administrative Code part 243, which updates National Ambient Air Quality...
NASA Technical Reports Server (NTRS)
2003-01-01
The vision document provides an overview of the Climate Change Science Program (CCSP) long-term strategic plan to enhance scientific understanding of global climate change.This document is a companion to the comprehensive Strategic Plan for the Climate Change Science Program. The report responds to the Presidents direction that climate change research activities be accelerated to provide the best possible scientific information to support public discussion and decisionmaking on climate-related issues.The plan also responds to Section 104 of the Global Change Research Act of 1990, which mandates the development and periodic updating of a long-term national global change research plan coordinated through the National Science and Technology Council.This is the first comprehensive update of a strategic plan for U.S. global change and climate change research since the origal plan for the U.S. Global Change Research Program was adopted at the inception of the program in 1989.
NASA Technical Reports Server (NTRS)
Hamilton, M. H.
1972-01-01
Data links for the guidance system of manned lunar module orbital and lunar missions are presented. Subjects discussed are: (1) digital uplink to lunar module, (2) lunar module liftoff time increment, (3) lunar module contiguous block update, (4) lunar module scatter update, (5) lunar module digital downlink, and (6) absolute addresses for update program.
Mission to Planet Earth Strategic Enterprise Plan 1996-2002
NASA Technical Reports Server (NTRS)
1996-01-01
Mission to Planet Earth's (MTPE's) first Strategic Enterprise Plan, issued in May 1995, defined the Agency's major goals and objectives as well as constraints. This update of the Strategic Enterprise Plan identifies the following major changes: a focused Science Research Plan that integrates space-based and in situ observational critical science to address critical science uncertainties; a technology infusion plan to reduce the cost of future missions; a series of flight opportunities to infuse new science into the overall program; and a tighter coupling between NASA and NOAA to reduce costs and to improve the overall program. Three important new initiatives are also under development and are described briefly in this plan: MTPE Education Strategy, MTPE Commercial Strategy, and an emerging concept for an Integrated Global Observing Strategy. This first update to the MTPE Strategic Enterprise Plan captures these new developments, and takes a significant step forward in planning this complex Earth system science endeavor. The plan and other information on MTPE may be viewed via the Internet at http://www.hq.nasa.gov/office/mtpe/.
A Management Plan for Historic Bridges in Virginia: Update / Scoping Phase.
DOT National Transportation Integrated Search
2014-04-01
"The Management Plan for Historic Bridges in Virginia, completed in 2001 (hereinafter the 2001 Management Plan), : identified the management and treatment needs for 54 bridges in Virginia that were individually eligible for or listed on the National ...
Nelson, Kurtis J.; Long, Donald G.; Connot, Joel A.
2016-02-29
The Landscape Fire and Resource Management Planning Tools (LANDFIRE) 2010 data release provides updated and enhanced vegetation, fuel, and fire regime layers consistently across the United States. The data represent landscape conditions from approximately 2010 and are the latest release in a series of planned updates to maintain currency of LANDFIRE data products. Enhancements to the data products included refinement of urban areas by incorporating the National Land Cover Database 2006 land cover product, refinement of agricultural lands by integrating the National Agriculture Statistics Service 2011 cropland data layer, and improved wetlands delineations using the National Land Cover Database 2006 land cover and the U.S. Fish and Wildlife Service National Wetlands Inventory data. Disturbance layers were generated for years 2008 through 2010 using remotely sensed imagery, polygons representing disturbance events submitted by local organizations, and fire mapping program data such as the Monitoring Trends in Burn Severity perimeters produced by the U.S. Geological Survey and the U.S. Forest Service. Existing vegetation data were updated to account for transitions in disturbed areas and to account for vegetation growth and succession in undisturbed areas. Surface and canopy fuel data were computed from the updated vegetation type, cover, and height and occasionally from potential vegetation. Historical fire frequency and succession classes were also updated. Revised topographic layers were created based on updated elevation data from the National Elevation Dataset. The LANDFIRE program also released a new Web site offering updated content, enhanced usability, and more efficient navigation.
A New U.S. Carbon Cycle Science Plan
NASA Astrophysics Data System (ADS)
Michalak, A. M.; Jackson, R.; Marland, G.; Sabine, C.
2009-05-01
The report "A U.S. carbon cycle science plan" (J. L. Sarmiento and S. C. Wofsy, U.S. Global Change Res. Program, Washington, D. C., 1999) outlined research priorities and promoted coordinated carbon cycle research across federal agencies in the United States for nearly a decade. Building on this framework and subsequent reports (http://www.carboncyclescience.gov/docs.php), a working group comprised of 27 scientists was formed in 2008 under the United States Carbon Cycle Science Program to review the 1999 Science Plan, and to develop an updated strategy for carbon cycle research for the period from 2010 to 2020. This comprehensive review is being conducted with wide input from the research and stakeholder communities. The recommendations of the Carbon Cycle Science Working Group (CCSWG) will go to U.S. agency managers who have collective responsibility for setting national carbon cycle science priorities and for sponsoring much of the carbon cycle research in the United States. This presentation will provide an update on the ongoing planning process, will outline the steps that the CCSWG is undertaking in building consensus towards an updated U.S. Carbon Cycle Science Plan, and will seek input on the best ways in which to coordinate efforts with ongoing and upcoming research in Canada and Mexico, as well as with ongoing work globally.
Analysis of Multi-Flight Common Routes for Traffic Flow Management
NASA Technical Reports Server (NTRS)
Sheth, Kapil; Clymer, Alexis; Morando, Alex; Shih, Fu-Tai
2016-01-01
When severe convective weather requires rerouting aircraft, FAA traffic managers employ severe weather avoidance plans (e.g., Playbook routes, Coded Departure Routes, etc.) These routes provide pilots with safe paths around weather-affected regions, and provide controllers with predictable, and often well-established flight plans. However, they often introduce large deviations to the nominal flight plans, which may not be necessary as weather conditions change. If and when the imposed traffic management initiatives (TMIs) become stale, updated shorter path flight trajectories may be found en route, providing significant time-savings to the affected flights. Multiple Flight Common Routes (MFCR) is a concept that allows multiple flights that are within a specified proximity or region, to receive updated shorter flight plans in an operationally efficient manner. MFCR is believed to provide benefits to the National Airspace System (NAS) by allowing traffic managers to update several flight plans of en route aircraft simultaneously, reducing operational workload within the TMUs of all affected ARTCCs. This paper will explore some aspects of the MFCR concept by analyzing multiple flights that have been selected for rerouting by the NAS Constraint Evaluation and Notification Tool (NASCENT). Various methods of grouping aircraft with common or similar routes will be presented, along with a comparison of the efficacy of these methods.
Five Year Strategic Plan, 1993-1997, Lakeland Community College.
ERIC Educational Resources Information Center
Lakeland Community Coll., Mentor, OH.
In 1990, the newly formed Planning Advisory Committee at Lakewood Community College (LCC) in Mentor, Ohio, developed the college's first 5-year strategic plan with input from across the campus. This plan for 1993-97 updates the original 1990-95 plan and is designed to assist in the development of annual goals and objectives. Following an…
77 FR 27417 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-10
... Agenda II. Approval of the March 9, 2012 Meeting Minutes III. Program Planning Update and discussion of projects: Strategic Planning Process Discussion on 2013 Statutory Report Selection Process IV. Management...
Facility effluent monitoring plan for the plutonium uranium extraction facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiegand, D.L.
A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less
Request for Correction 15003 - Information Quality Act request for Correction of the TSCA Work Plan
This RFC concerns the Information Quality Act request for correction of the TSCA Work Plan for Chemical Assessments: 20154 Update and the TSCA Work Plan Chemicals: Methods Document (February 2012) regarding assessment of phthalic anhydride
DOE Office of Scientific and Technical Information (OSTI.GOV)
Akhiat, A.; Elekta, Sunnyvale, CA; Kanis, A.P.
Purpose: To extend a clinical Record and Verify (R&V) system to enable a safe and fast workflow for Plan-of-the-Day (PotD) adaptive treatments based on patient-specific plan libraries. Methods: Plan libraries for PotD adaptive treatments contain for each patient several pre-treatment generated treatment plans. They may be generated for various patient anatomies or CTV-PTV margins. For each fraction, a Cone Beam CT scan is acquired to support the selection of the plan that best fits the patient’s anatomy-of-the-day. To date, there are no commercial R&V systems that support PotD delivery strategies. Consequently, the clinical workflow requires many manual interventions. Moreover, multiplemore » scheduled plans have a high risk of excessive dose delivery. In this work we extended a commercial R&V system (MOSAIQ) to support PotD workflows using IQ-scripting. The PotD workflow was designed after extensive risk analysis of the manual procedure, and all identified risks were incorporated as logical checks. Results: All manual PotD activities were automated. The workflow first identifies if the patient is scheduled for PotD, then performs safety checks, and continues to treatment plan selection only if no issues were found. The user selects the plan to deliver from a list of candidate plans. After plan selection, the workflow makes the treatment fields of the selected plan available for delivery by adding them to the treatment calendar. Finally, control is returned to the R&V system to commence treatment. Additional logic was added to incorporate off-line changes such as updating the plan library. After extensive testing including treatment fraction interrupts and plan-library updates during the treatment course, the workflow is running successfully in a clinical pilot, in which 35 patients have been treated since October 2014. Conclusion: We have extended a commercial R&V system for improved safety and efficiency in library-based adaptive strategies enabling a wide-spread implementation of those strategies. This work was in part funded by a research grant of Elekta AB, Stockholm, Sweden.« less
Proposed reporting model update creates dialogue between FASB and not-for-profits.
Mosrie, Norman C
2016-04-01
Seeing a need to refresh the current guidelines, the Financial Accounting Standards Board (FASB) proposed an update to the financial accounting and reporting model for not-for-profit entities. In a response to solicited feedback, the board is now revisiting its proposed update and has set forth a plan to finalize its new guidelines. The FASB continues to solicit and respond to feedback as the process progresses.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-12
... Environmental Impact Statement for General Management Plan for Golden Gate National Recreation Area and Muir... Management Plan for Golden Gate National Recreation Area and Muir Woods National Monument. SUMMARY: In accord... Environmental Impact Statement (Draft EIS) for the updating the General Management Plan (GMP) for Golden Gate...
Intelligent Tools for Planning Knowledge base Development and Verification
NASA Technical Reports Server (NTRS)
Chien, Steve A.
1996-01-01
A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.
Static and Completion Analysis for Planning Knowledge Base Development and Verification
NASA Technical Reports Server (NTRS)
Chien, Steve A.
1996-01-01
A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.
NASA Technical Reports Server (NTRS)
Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.
1975-01-01
A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.
Development of an Updated Strategic Marketing Plan for Fox Valley Technical College.
ERIC Educational Resources Information Center
May, Susan A.
This project was conducted to develop a comprehensive strategic marketing plan for Fox Valley Technical College (FVTC). Components included a review of the literature, establishing criteria for the plan, validation of the criteria, the actual development of the plan involving a formative committee, and the review of institutional marketing plans…
76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-31
... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...
A SWOT Analysis of the Updated National HIV/AIDS Strategy for the U.S., 2015-2020.
Holtgrave, David R; Greenwald, Robert
2016-01-01
In July 2015, President Barack Obama released an updated National HIV/AIDS Strategy (NHAS) for the United States to guide HIV efforts through the year 2020. A federal action plan to accompany the updated NHAS will be released in December 2015. In this editorial, we offer a strengths, weaknesses, opportunities and threats analysis with the aim of increasing discussion of ways to truly fulfill the promise of the updated NHAS and to address barriers that may thwart it from achieving its full potential.
Role of Cone Beam Computed Tomography in Diagnosis and Treatment Planning in Dentistry: An Update.
Shukla, Sagrika; Chug, Ashi; Afrashtehfar, Kelvin I
2017-11-01
Accurate diagnosis and treatment planning are the backbone of any medical therapy; for this reason, cone beam computed tomography (CBCT) was introduced and has been widely used. CBCT technology provides a three-dimensional image viewing, enabling exact location and extent of lesions or any anatomical region. For the very same reason, CBCT can not only be used for surgical fields but also for fields such as endodontics, prosthodontics, and orthodontics for appropriate treatment planning and effective dental care. The aim and clinical significance of this review are to update dental clinicians on the CBCT applications in each dental specialty for an appropriate diagnosis and more predictable treatment.
Simulation as a planning tool for job-shop production environment
NASA Astrophysics Data System (ADS)
Maram, Venkataramana; Nawawi, Mohd Kamal Bin Mohd; Rahman, Syariza Abdul; Sultan, Sultan Juma
2015-12-01
In this paper, we made an attempt to use discrete event simulation software ARENA® as a planning tool for job shop production environment. We considered job shop produces three types of Jigs with different sequence of operations to study and improve shop floor performance. The sole purpose of the study is to identifying options to improve machines utilization, reducing job waiting times at bottleneck machines. First, the performance of the existing system was evaluated by using ARENA®. Then identified improvement opportunities by analyzing base system results. Second, updated the model with most economical options. The proposed new system outperforms with that of the current base system by 816% improvement in delay times at paint shop by increase 2 to 3 and Jig cycle time reduces by Jig1 92%, Jig2 65% and Jig3 41% and hence new proposal was recommended.
75 FR 51275 - National Institute of Mental Health; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-19
... Strategic Plan Updating Process of the Interagency Autism Coordinating Committee (IACC). The Subcommittee... Autism Coordinating Committee (IACC). Type of Meeting: Subcommittee for Planning the Annual Strategic... 51276
NASA Technical Reports Server (NTRS)
1974-01-01
Attitude reference systems for use with the Earth Observatory Satellite (EOS) are described. The systems considered are fixed and gimbaled star trackers, star mappers, and digital sun sensors. Covariance analyses were performed to determine performance for the most promising candidate in low altitude and synchronous orbits. The performance of attitude estimators that employ gyroscopes which are periodically updated by a star sensor is established by a single axis covariance analysis. The other systems considered are: (1) the propulsion system design, (2) electric power and electrical integration, (3) thermal control, (4) ground data processing, and (5) the test plan and cost reduction aspects of observatory integration and test.
Resource-Constrained Project Scheduling Under Uncertainty: Models, Algorithms and Applications
2014-11-10
Make-to-Order (MTO) Production Planning using Bayesian Updating, International Journal of Production Economics (04 2014) Norman Keith Womer, Haitao...2013) Made-to-Order Production Scheduling using Bayesian Updating, Working Paper, under second-round review in International Journal of Production Economics . VI
DOT National Transportation Integrated Search
2015-10-02
Initial WorkshopI held on September 18, 2014 at the Volpe Center; Overview of DOT GPS Adjacent Band Compatibility Assessment Plan and plans/timeline for implementation; Presentation on GPS use cases and list of representative GPS receivers; Descri...
76 FR 40753 - NASA Advisory Council; Aeronautics Committee; Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-11
... strategy Verification and Validation of Flight Critical Systems planning update NASA Aeronautics systems analysis and strategic planning It is imperative that this meeting be held on this date to accommodate the... aeronautics community and other persons, research and technical information relevant to program planning...
NASA Technical Reports Server (NTRS)
Dunn, Michael R.
2014-01-01
Over the course of my internship in the Flight Projects Office of NASA's Launch Services Program (LSP), I worked on two major projects, both of which dealt with updating current systems to make them more accurate and to allow them to operate more efficiently. The first project dealt with the Mission Integration Reporting System (MIRS), a web-accessible database application used to manage and provide mission status reporting for the LSP portfolio of awarded missions. MIRS had not gone through any major updates since its implementation in 2005, and it was my job to formulate a recommendation for the improvement of the system. The second project I worked on dealt with the Mission Plan, a document that contains an overview of the general life cycle that is followed by every LSP mission. My job on this project was to update the information currently in the mission plan and to add certain features in order to increase the accuracy and thoroughness of the document. The outcomes of these projects have implications in the orderly and efficient operation of the Flight Projects Office, and the process of Mission Management in the Launch Services Program as a whole.
January 2012 Groundwater Sampling at the Gnome-Coach, New Mexico, Site (Data Validation Package)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Findlay, Richard C.
2012-12-01
Annual sampling was conducted January 18, 2012, to monitor groundwater for potential radionuclide contamination at the Gnome-Coach site in New Mexico. The sampling was performed as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351, continually updated). Well LRL-7 was not sampled per instruction from the lead. A duplicate sample was collected from well USGS-1 and water levels were measured in the monitoring wells onsite.
January 2011 Groundwater Sampling at the Gnome-Coach, New Mexico, Site (Data Validation Package)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Findlay, Richard C.
2011-11-01
Annual sampling was conducted January 19, 2011, to monitor groundwater for potential radionuclide contamination at the Gnome-Coach site in New Mexico. The sampling was performed as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351, continually updated). Well LRL-7 was not sampled per instruction from the lead. A duplicate sample was collected from well USGS-1.Water levels were measured in the monitoring wells onsite.
2011-01-01
military requirements and design options for extending the B61 bomb’s service life. The B61 is used to support the U.S. strategic deterrent and the...extension programs, and interviewed officials responsible for B61 operations, life extension program planning, management, and oversight. This is...NNSA have made progress in studying and updating the military’s performance requirements for the B61 bomb and have ruled out some design options, but
NASA Technical Reports Server (NTRS)
Zhu, Renjie; Zhang, Xiuzhong; Wei, Wenren; Xiang, Ying; Li, Bin; Wu, Yajun; Shu, Fengchun; Luo, Jintao; Wang, Jinqing; Xue, Zhuhe;
2010-01-01
The Chinese Data Acquisition System (CDAS) based on FPGA techniques has been developed in China for the purpose of replacing the traditional analog baseband converter. CDAS is a high speed data acquisition and processing system with 1024 Msps sample rate for 512M bandwidth input and up to 16 channels (both USB and LSB) output with VSI interface compatible. The instrument is a flexible environment which can be updated easily. In this paper, the construction, the performance, the experiment results, and the future plans of CDAS will be reported.
NASA Astrophysics Data System (ADS)
Barton, E.; Middleton, C.; Koo, K.; Crocker, L.; Brownjohn, J.
2011-07-01
This paper presents the results from collaboration between the National Physical Laboratory (NPL) and the University of Sheffield on an ongoing research project at NPL. A 50 year old reinforced concrete footbridge has been converted to a full scale structural health monitoring (SHM) demonstrator. The structure is monitored using a variety of techniques; however, interrelating results and converting data to knowledge are not possible without a reliable numerical model. During the first stage of the project, the work concentrated on static loading and an FE model of the undamaged bridge was created, and updated, under specified static loading and temperature conditions. This model was found to accurately represent the response under static loading and it was used to identify locations for sensor installation. The next stage involves the evaluation of repair/strengthening patches under both static and dynamic loading. Therefore, before deliberately introducing significant damage, the first set of dynamic tests was conducted and modal properties were estimated. The measured modal properties did not match the modal analysis from the statically updated FE model; it was clear that the existing model required updating. This paper introduces the results of the dynamic testing and model updating. It is shown that the structure exhibits large non-linear, amplitude dependant characteristics. This creates a difficult updating process, but we attempt to produce the best linear representation of the structure. A sensitivity analysis is performed to determine the most sensitive locations for planned damage/repair scenarios and is used to decide whether additional sensors will be necessary.
Louisiana's 2017 Master Plan for a Sustainable Coast
NASA Astrophysics Data System (ADS)
Haase, B.
2017-12-01
The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement
76 FR 76769 - National Science Board; Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-08
.... FY 2012 Transfer Authority. Update on NSF FY 2013 Budget Development. Policies and planning for... STEM education plan. Discussion of the NSF STEM education research portfolio: getting from theory to...
Update on optical design of adaptive optics system at Lick Observatory
NASA Astrophysics Data System (ADS)
Bauman, Brian J.; Gavel, Donald T.; Waltjen, Kenneth E.; Freeze, Gary J.; Hurd, Randall L.; Gates, Elinor L.; Max, Claire E.; Olivier, Scot S.; Pennington, Deanna M.
2002-02-01
In 1999, we presented our plan to upgrade the adaptive optics (AO) system on the Lick Observatory Shane telescope (3m) from a prototype instrument pressed into field service to a facility instrument. This paper updates the progress of that plan and details several important improvements in the alignment and calibration of the AO bench. The paper also includes a discussion of the problems seen in the original design of the tip/tilt (t/t) sensor used in laser guide star mode, and how these problems were corrected with excellent results.
Update on Optical Design of Adaptive Optics System at Lick Observatory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bauman, B J; Gavel, D T; Waltjen, K E
2001-07-31
In 1999, we presented our plan to upgrade the adaptive optics (AO) system on the Lick Observatory Shane telescope (3m) from a prototype instrument pressed into field service to a facility instrument. This paper updates the progress of that plan and details several important improvements in the alignment and calibration of the AO bench. The paper also includes a discussion of the problems seen in the original design of the tip/tilt (t/t) sensor used in laser guide star mode, and how these problems were corrected with excellent results.
Dissociable effects of surprise and model update in parietal and anterior cingulate cortex
O’Reilly, Jill X.; Schüffelgen, Urs; Cuell, Steven F.; Behrens, Timothy E. J.; Mars, Rogier B.; Rushworth, Matthew F. S.
2013-01-01
Brains use predictive models to facilitate the processing of expected stimuli or planned actions. Under a predictive model, surprising (low probability) stimuli or actions necessitate the immediate reallocation of processing resources, but they can also signal the need to update the underlying predictive model to reflect changes in the environment. Surprise and updating are often correlated in experimental paradigms but are, in fact, distinct constructs that can be formally defined as the Shannon information (IS) and Kullback–Leibler divergence (DKL) associated with an observation. In a saccadic planning task, we observed that distinct behaviors and brain regions are associated with surprise/IS and updating/DKL. Although surprise/IS was associated with behavioral reprogramming as indexed by slower reaction times, as well as with activity in the posterior parietal cortex [human lateral intraparietal area (LIP)], the anterior cingulate cortex (ACC) was specifically activated during updating of the predictive model (DKL). A second saccade-sensitive region in the inferior posterior parietal cortex (human 7a), which has connections to both LIP and ACC, was activated by surprise and modulated by updating. Pupillometry revealed a further dissociation between surprise and updating with an early positive effect of surprise and late negative effect of updating on pupil area. These results give a computational account of the roles of the ACC and two parietal saccade regions, LIP and 7a, by which their involvement in diverse tasks can be understood mechanistically. The dissociation of functional roles between regions within the reorienting/reprogramming network may also inform models of neurological phenomena, such as extinction and Balint syndrome, and neglect. PMID:23986499
40 CFR 68.95 - Emergency response program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... emergency response plan, which shall be maintained at the stationary source and contain at least the...; and (4) Procedures to review and update, as appropriate, the emergency response plan to reflect... that complies with other Federal contingency plan regulations or is consistent with the approach in the...
40 CFR 68.95 - Emergency response program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... emergency response plan, which shall be maintained at the stationary source and contain at least the...; and (4) Procedures to review and update, as appropriate, the emergency response plan to reflect... that complies with other Federal contingency plan regulations or is consistent with the approach in the...
40 CFR 68.95 - Emergency response program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... emergency response plan, which shall be maintained at the stationary source and contain at least the...; and (4) Procedures to review and update, as appropriate, the emergency response plan to reflect... that complies with other Federal contingency plan regulations or is consistent with the approach in the...
40 CFR 68.95 - Emergency response program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... emergency response plan, which shall be maintained at the stationary source and contain at least the...; and (4) Procedures to review and update, as appropriate, the emergency response plan to reflect... that complies with other Federal contingency plan regulations or is consistent with the approach in the...
40 CFR 68.95 - Emergency response program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... emergency response plan, which shall be maintained at the stationary source and contain at least the...; and (4) Procedures to review and update, as appropriate, the emergency response plan to reflect... that complies with other Federal contingency plan regulations or is consistent with the approach in the...
48 CFR 52.216-7 - Allowable Cost and Payment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... last disclosure of internal audit reports to the Government. (J) Annual internal audit plan of...-contract cost allowability limitations, and billing limitations. (v) The Contractor shall update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct...
76 FR 35483 - Privacy Act of 1974; System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
... May 12, 2009, revisions, and will update the retention period from 6 months to 12 months for online...; retrievability; safeguards; retention and disposal; system manager(s) and address; notification procedure; and..., and planning. The other changes outlined update retention periods, administrative changes, and system...
Landsat Imagery: A Tool for Updating Land Use in Gulf Coast Mexico
ERIC Educational Resources Information Center
Harnapp, Vern
1978-01-01
Explores the use of Landsat imagery in mapping and updating land use for the purpose of planning. Examines Gulf Coast Mexico as a case study, because modern agricultural techniques used to expand the ranching industry have significantly altered the landscape. (Author/BC)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-17
... Recovery Plan for the North Pacific Right Whale AGENCY: National Marine Fisheries Service (NMFS), National... recovery plans; request for information. SUMMARY: The National Marine Fisheries Service (NMFS) is... ESA. The recovery planning process is guided by the statutory language of Section 4(f) of the ESA and...
Family Planning in Five Continents: Africa, America, Asia, Europe, Oceania. November 1975 Update.
ERIC Educational Resources Information Center
International Planned Parenthood Federation, London (England).
This document gives highlights of the family planning situation in countries of the world, together with basic demographic statistics. Its purpose is to provide a quick reference source for those who work in family planning, population, and other related fields. Following a brief history of the pioneering work in family planning, population…
ERIC Educational Resources Information Center
Galligani, Dennis J.
An update of the University of California, Irvine, Student Affirmative Action (SAA) plan is presented for 1985-1986. SAA activities planned by both academic and administrative units are covered, such as activities designed to: stimulate greater student involvement, establish clearer life goals and career linkages, enhance cultural awareness, and…
ACHP | News | ACHP Updates Tribal Consultation Plan
for each federal agency to submit to OMB within 90 days a plan of action to implement President Bill tribal consultation. To implement the provisions of the tribal policy, the ACHP adopted an action plan in 2003 which provides program direction to the staff. The action plan is available here. To comply with
Miguel, Alexander; Hall, Anna; Liu, Wei; Garrett, Jeremy; Ballew, Angel; Yang, Tsu-Hsaun; Segal, Richard
2017-01-01
The Centers for Medicare & Medicaid Services (CMS) require prescription drug plan sponsors to offer a comprehensive medication review (CMR) annually to eligible beneficiaries through the plans' Medication Therapy Management Programs (MTMPs). In 2011, the Pharmacy Quality Alliance endorsed the CMR completion rate as a quality measure for MTMPs, and CMS has adopted the measure into the 2016 CMS star ratings. CMS star ratings are used to describe the quality of plans to assist Medicare plan enrollees in choosing a plan and to determine quality bonus payments for Medicare Advantage plans. Star ratings are measured on a scale of 1 to 5, with 5 being the highest possible rating for an individual measure. Currently, the majority of plans score 2 stars or less on the CMR completion rate measure. To demonstrate the effectiveness of a standardized CMR recruitment script emphasizing the benefits of the service to increase acceptance of CMR offers among beneficiaries of a Medicare prescription drug plan. A CMR recruitment script, shaped by the Health Belief Model, was developed based on a previous pilot study. The original script described the CMR service but did not emphasize key benefits or barriers from the beneficiary perspective. The updated script aimed to enhance beneficiary understanding of the CMR service, explain the benefits from the beneficiary perspective, and address potential barriers to accepting the service. The updated script was tested during the 2012 MTMP enrollment in a randomized controlled experiment, using the original script as the control. The CMR service was offered to MTMP members via phone calls by live call agents who spoke with members who answered, using 1 of the 2 scripts. Both scripts asked members if they were willing to have a pharmacist call them back and perform a CMR at a later date. Two call attempts were made to all eligible beneficiaries. If contact was not made after 2 unsuccessful outreach attempts, a computer-generated voicemail message was left, and an informational letter regarding the MTMP and CMR was subsequently mailed. CMR acceptance rates, defined as the proportion of beneficiaries who spoke with a call agent and agreed to participate in the CMR service, divided by the total number of beneficiaries contacted who confirmed their membership with the Part D plan, were compared between those exposed to the original script and those exposed to the updated script. Multivariate logistic regression was employed to examine factors that may have influenced members' decisions regarding the offer to participate in CMRs. There were 105,701 beneficiaries in the first quarter of the MTMP 2012 enrollment who were eligible for the MTM service. Approximately 10% of eligible beneficiaries answered the live calls and listened to the scripts. On average, members who responded to calls were aged 68.9 years, prescribed 10.5 chronic medications, and had 6 different chronic conditions. Among members who answered the calls, 52.9% were exposed to the original script, and 47.1% heard the updated script. For the updated script, 48.2% of the members accepted the offer to be subsequently contacted by a pharmacist to complete the CMR, whereas 38.1% of members exposed to the original script agreed to the CMR offer. Logistic regression results indicated that members who received the updated script were 1.58 (95% CI = 1.45-1.72) times more likely to accept the CMR offer compared with those who received the original script. Among other factors, increased number of chronic medications (OR = 1.038, 95% CI = 1.020-1.057), increased number of disease conditions (OR = 1.039, 95% CI = 1.014-1.064), and previous involvement in the MTMP were positively associated with acceptance of the CMR offer. The updated script outperformed the original script in promoting member willingess to participate in a CMR by describing key components and emphasizing benefits of participation. CMR engagement remains a challenge for Medicare plan sponsors. This study demonstrates that to overcome common hurdles to CMR engagement, sponsors should seek strategies to educate members regarding MTM programs and the benefits and components of a CMR. No outside funding supported this study. Research for this study was conducted while Liu was a postdoctoral fellow at the University of Florida. Liu is currently an employee of the U.S. Food and Drug Administration (FDA). The views expressed here are those of the authors and not necessarily those of the FDA. Yang reports receiving a research fellowship funded by WellCare Health Plans at the time of this study. The authors report no other potential conflicts of interest. Study concept and design were primarily contributed by Yang, Segal, and Miguel, along with Hall, Liu, and Ballew. Miguel, Liu, Yang, Ballew, and Hall collected the data, which were analysed and interpreted primarily by Liu, along with Yang and Segal and assisted by the other authors. The manuscript was written primarily by Miguel, Hall, and Garret, along with Liu, Yang, and Ballew, and revised by Ballew, Segal, Hall, and Miguel, along with Liu and Yang.
Stuckey, Marla H.
2008-01-01
The Water Resources Planning Act, Act 220 of 2002, requires the Pennsylvania Department of Environmental Protection (PaDEP) to update the State Water Plan by 2008. As part of this update, a water-analysis screening tool (WAST) was developed by the U.S. Geological Survey, in cooperation with the PaDEP, to provide assistance to the state in the identification of critical water-planning areas. The WAST has two primary inputs: net withdrawals and the initial screening criteria. A comprehensive water-use database that includes data from registration, estimation, discharge monitoring reports, mining data, and other sources was developed as input into the WAST. Water use in the following categories was estimated using water-use factors: residential, industrial, commercial, agriculture, and golf courses. A percentage of the 7-day, 10-year low flow is used for the initial screenings using the WAST to identify potential critical water-planning areas. This quantity, or initial screening criteria, is 50 percent of the 7-day, 10-year low flow for most streams. Using a basic water-balance equation, a screening indicator is calculated that indicates the potential influences of net withdrawals on aquatic-resource uses for watersheds generally larger than 15 square miles. Points representing outlets of these watersheds are colored-coded within the WAST to show the screening criteria for each watershed.
End-of-Mission Planning Challenges for a Satellite in a Constellation
NASA Technical Reports Server (NTRS)
Boain, Ronald J.
2013-01-01
At the end of a mission, satellites embedded in a constellation must first perform propulsive maneuvers to safely exit the constellation before they can begin with the usual end-of-mission activities: deorbit, passivation, and decommissioning. The target orbit for these exit maneuvers must be sufficiently below the remaining constellation satellites such that, once achieved, there is no longer risk of close conjunctions. Yet, the exit maneuvers must be done based on the spacecraft's state of health and operational capability when the decision to end the mission is made. This paper focuses on the recently developed exit strategy for the CloudSat mission to highlight problems and issues, which forced the discarding of CloudSat's original EoM Plan and its replacement with a new plan consistent with changes to the spacecraft's original operational mode. The analyses behind and decisions made in formulating this new exit strategy will be of interest to other missions in a constellation currently preparing to update their End-of-Mission Plan.
Efficiency improvements of offline metrology job creation
NASA Astrophysics Data System (ADS)
Zuniga, Victor J.; Carlson, Alan; Podlesny, John C.; Knutrud, Paul C.
1999-06-01
Progress of the first lot of a new design through the production line is watched very closely. All performance metrics, cycle-time, in-line measurement results and final electrical performance are critical. Rapid movement of this lot through the line has serious time-to-market implications. Having this material waiting at a metrology operation for an engineer to create a measurement job plan wastes valuable turnaround time. Further, efficient use of a metrology system is compromised by the time required to create and maintain these measurement job plans. Thus, having a method to develop metrology job plans prior to the actual running of the material through the manufacture area can significantly improve both cycle time and overall equipment efficiency. Motorola and Schlumberger have worked together to develop and test such a system. The Remote Job Generator (RJG) created job plans for new device sin a manufacturing process from an NT host or workstation, offline. This increases available system tim effort making production measurements, decreases turnaround time on job plan creation and editing, and improves consistency across job plans. Most importantly this allows job plans for new devices to be available before the first wafers of the device arrive at the tool for measurement. The software also includes a database manager which allows updates of existing job plans to incorporate measurement changes required by process changes or measurement optimization. This paper will review the result of productivity enhancements through the increased metrology utilization and decreased cycle time associated with the use of RJG. Finally, improvements in process control through better control of Job Plans across different devices and layers will be discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-26
...] Agency Information Collection Activities: Proposed Collection; Comments Requested: Strategic Planning... agencies update and revise their strategic plans every three years. The Strategic Planning Office at ATF... accepted for ``sixty days'' until May 25, 2012. This process is conducted in accordance with 5 CFR 1320.10...
Trial by Fire (and Tornado) Taught Us to Plan for Crises.
ERIC Educational Resources Information Center
Caylor, Mary Jane
1991-01-01
Based on Huntsville (Alabama) schools' experience with a devastating fire, the superintendent later ensured adequate fire insurance coverage, promoted regular fire drills, and developed an emergency response plan that delineated staff responsibilities, communication modes, and training and updating procedures. The plan served the district well…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... Environmental Impact Statement for General Management Plan/ Wilderness Study, Hawaii Volcanoes National Park... Service is expanding the scope of the Environmental Impact Statement (EIS) that is being prepared for updating the General Management Plan (GMP) for Hawaii Volcanoes National Park. As part of this conservation...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-19
... DEPARTMENT OF THE INTERIOR National Park Service General Management Plan; Joshua Tree National... National Park Service is updating the General Management Plan (GMP) for Joshua Tree National Park... park management and resource analysis, other designations such as establishment of 594,502 acres by...
Contemporary Technologies...2...An Updated Plan for NIACC's Future.
ERIC Educational Resources Information Center
Hecht, Alfred R.; And Others
Background information on and plans for the use of contemporary technologies at North Iowa Area Community College (NIACC) are provided in this report. Part I begins with a discussion of the integration of contemporary technology in business and industry; describes NIACC's contemporary technology strategic planning initiative; and gives an overview…
77 FR 75442 - Land Buy-Back Program for Tribal Nations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-20
... Department expects to continually update its plans to reflect tribal feedback, lessons learned, and best... of 2011, the Department issued a draft plan dated January 2012. The Department has developed this Initial Implementation Plan for the Land Buy-Back Program for Tribal Nations incorporating input received...
Code of Federal Regulations, 2011 CFR
2011-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
Code of Federal Regulations, 2013 CFR
2013-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
Code of Federal Regulations, 2014 CFR
2014-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6 Eligibility... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
Alaska Department of Labor and Workforce Development
; Workforce Development > Alaska Maritime Workforce Development Plan FIND A MARITIME JOB SIGN UP TO RECEIVE MARITIME JOB UPDATES REQUEST A PRESENTATION OF THE PLAN TO YOUR ORGANIZATION CONTACT US Homer Marine Trades Association Resolution in Support of the Alaska Maritime Workforce Development Plan Kenai Peninsula Borough
Zero Emission Vehicle (ZEV) Promotion Plan All California state agencies must support and their stakeholders to accomplish the following: Update the 2016 ZEV Action plan, with a focus on low affordable and accessible to all drivers. The ZEV promotion plan additionally directs the state fleet to
Reimagining the Role of Technology in Education: 2017 National Education Technology Plan Update
ERIC Educational Resources Information Center
Office of Educational Technology, US Department of Education, 2017
2017-01-01
The National Education Technology Plan (NETP) sets a national vision and plan for learning enabled by technology through building on the work of leading education researchers; district, school, and higher education leaders; classroom teachers; developers; entrepreneurs; and nonprofit organizations. The principles and examples provided in this…
77 FR 58352 - Approval and Promulgation of Implementation Plans; State of Missouri
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... the state of Missouri on September 21, 2010. This revision proposes to amend the ambient air quality standards table to reflect revised National Ambient Air Quality Standards (NAAQS), update reference methods associated with the revised NAAQS, and update the breakpoint values for the Air Quality Index. These...
25 CFR 170.425 - How does BIA update the IRRTIP?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false How does BIA update the IRRTIP? 170.425 Section 170.425 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Transportation...
25 CFR 170.444 - How is the IRR Inventory updated?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false How is the IRR Inventory updated? 170.444 Section 170.444 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Irr Inventory...
Updated: SREB States Transform School Accountability with "NCLB" Waivers. Policy Brief
ERIC Educational Resources Information Center
Decuir, Erica
2014-01-01
This latest brief updates education leaders on the key policies the 13 (Arkansas, Delaware, Florida, Georgia, Kentucky, Louisiana, Maryland, Mississippi, North Carolina, Oklahoma, South Carolina, Tennessee and Virginia) Southern Regional Education Board (SREB) states plan to implement under federal waivers to No Child Left Behind. It details,…
Statewide pedestrian and bicycle planning handbook
DOT National Transportation Integrated Search
2014-09-01
This handbook is designed to help State departments of transportation (DOTs) develop or update State pedestrian and bicycle plans. Based on research including interviews with nine State DOTs and critical evaluations of documents from 15 States, this ...
NASA Technical Reports Server (NTRS)
1980-01-01
An updated program plan is presented showing the task descriptions depicting the work, progress, achievements, and the cause of any deviations from the original plan (SC-1), and how this impacted on the original schedule of the program. In addition there is an update documenting all design alterations made during the pre-production phase and a complete up to date set of engineering and manufacturing documentation (CM-1). The purpose of the work in the original plan was to explore, design, develop, test, and deliver 1000 watts of prototype flat plate, photovoltaic modules appropriate for use in applications in the 20 to 500 kilowatt range and which show potential for meeting the 1986 cost goals.
Environmental Management System Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, Robert; Thorson, Patrick; Horst, Blair
2009-03-24
Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and othermore » natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.« less
Spatial Coverage Planning for Exploration Robots
NASA Technical Reports Server (NTRS)
Gaines, Daniel; Estlin, Tara; Chouinard, Caroline
2007-01-01
A report discusses an algorithm for an onboard planning and execution technology to support the exploration and characterization of geological features by autonomous rovers. A rover that is capable of deciding which observations are more important relieves the engineering team from much of the burden of attempting to make accurate predictions of what the available rover resources will be in the future. Instead, the science and engineering teams can uplink a set of observation requests that may potentially oversubscribe resources and let the rover use observation priorities and its current assessment of available resources to make decisions about which observations to perform and when to perform them. The algorithm gives the rover the ability to model spatial coverage quality based on data from different scientific instruments, to assess the impact of terrain on coverage quality, to incorporate user-defined priorities among subregions of the terrain to be covered, and to update coverage quality rankings of observations when terrain knowledge changes. When the rover is exploring large geographical features such as craters, channels, or boundaries between two different regions, an important factor in assessing the quality of a mission plan is how the set of chosen observations spatially cover the area of interest. The algorithm allows the rover to evaluate which observation to perform and to what extent the candidate observation will increase the spatial coverage of the plan.
Knips, Guido; Zibner, Stephan K U; Reimann, Hendrik; Schöner, Gregor
2017-01-01
Reaching for objects and grasping them is a fundamental skill for any autonomous robot that interacts with its environment. Although this skill seems trivial to adults, who effortlessly pick up even objects they have never seen before, it is hard for other animals, for human infants, and for most autonomous robots. Any time during movement preparation and execution, human reaching movement are updated if the visual scene changes (with a delay of about 100 ms). The capability for online updating highlights how tightly perception, movement planning, and movement generation are integrated in humans. Here, we report on an effort to reproduce this tight integration in a neural dynamic process model of reaching and grasping that covers the complete path from visual perception to movement generation within a unified modeling framework, Dynamic Field Theory. All requisite processes are realized as time-continuous dynamical systems that model the evolution in time of neural population activation. Population level neural processes bring about the attentional selection of objects, the estimation of object shape and pose, and the mapping of pose parameters to suitable movement parameters. Once a target object has been selected, its pose parameters couple into the neural dynamics of movement generation so that changes of pose are propagated through the architecture to update the performed movement online. Implementing the neural architecture on an anthropomorphic robot arm equipped with a Kinect sensor, we evaluate the model by grasping wooden objects. Their size, shape, and pose are estimated from a neural model of scene perception that is based on feature fields. The sequential organization of a reach and grasp act emerges from a sequence of dynamic instabilities within a neural dynamics of behavioral organization, that effectively switches the neural controllers from one phase of the action to the next. Trajectory formation itself is driven by a dynamical systems version of the potential field approach. We highlight the emergent capacity for online updating by showing that a shift or rotation of the object during the reaching phase leads to the online adaptation of the movement plan and successful completion of the grasp.
Knips, Guido; Zibner, Stephan K. U.; Reimann, Hendrik; Schöner, Gregor
2017-01-01
Reaching for objects and grasping them is a fundamental skill for any autonomous robot that interacts with its environment. Although this skill seems trivial to adults, who effortlessly pick up even objects they have never seen before, it is hard for other animals, for human infants, and for most autonomous robots. Any time during movement preparation and execution, human reaching movement are updated if the visual scene changes (with a delay of about 100 ms). The capability for online updating highlights how tightly perception, movement planning, and movement generation are integrated in humans. Here, we report on an effort to reproduce this tight integration in a neural dynamic process model of reaching and grasping that covers the complete path from visual perception to movement generation within a unified modeling framework, Dynamic Field Theory. All requisite processes are realized as time-continuous dynamical systems that model the evolution in time of neural population activation. Population level neural processes bring about the attentional selection of objects, the estimation of object shape and pose, and the mapping of pose parameters to suitable movement parameters. Once a target object has been selected, its pose parameters couple into the neural dynamics of movement generation so that changes of pose are propagated through the architecture to update the performed movement online. Implementing the neural architecture on an anthropomorphic robot arm equipped with a Kinect sensor, we evaluate the model by grasping wooden objects. Their size, shape, and pose are estimated from a neural model of scene perception that is based on feature fields. The sequential organization of a reach and grasp act emerges from a sequence of dynamic instabilities within a neural dynamics of behavioral organization, that effectively switches the neural controllers from one phase of the action to the next. Trajectory formation itself is driven by a dynamical systems version of the potential field approach. We highlight the emergent capacity for online updating by showing that a shift or rotation of the object during the reaching phase leads to the online adaptation of the movement plan and successful completion of the grasp. PMID:28303100
Comparing Methods for Dynamic Airspace Configuration
NASA Technical Reports Server (NTRS)
Zelinski, Shannon; Lai, Chok Fung
2011-01-01
This paper compares airspace design solutions for dynamically reconfiguring airspace in response to nominal daily traffic volume fluctuation. Airspace designs from seven algorithmic methods and a representation of current day operations in Kansas City Center were simulated with two times today's demand traffic. A three-configuration scenario was used to represent current day operations. Algorithms used projected unimpeded flight tracks to design initial 24-hour plans to switch between three configurations at predetermined reconfiguration times. At each reconfiguration time, algorithms used updated projected flight tracks to update the subsequent planned configurations. Compared to the baseline, most airspace design methods reduced delay and increased reconfiguration complexity, with similar traffic pattern complexity results. Design updates enabled several methods to as much as half the delay from their original designs. Freeform design methods reduced delay and increased reconfiguration complexity the most.
Enabling Incremental Query Re-Optimization.
Liu, Mengmeng; Ives, Zachary G; Loo, Boon Thau
2016-01-01
As declarative query processing techniques expand to the Web, data streams, network routers, and cloud platforms, there is an increasing need to re-plan execution in the presence of unanticipated performance changes. New runtime information may affect which query plan we prefer to run. Adaptive techniques require innovation both in terms of the algorithms used to estimate costs , and in terms of the search algorithm that finds the best plan. We investigate how to build a cost-based optimizer that recomputes the optimal plan incrementally given new cost information, much as a stream engine constantly updates its outputs given new data. Our implementation especially shows benefits for stream processing workloads. It lays the foundations upon which a variety of novel adaptive optimization algorithms can be built. We start by leveraging the recently proposed approach of formulating query plan enumeration as a set of recursive datalog queries ; we develop a variety of novel optimization approaches to ensure effective pruning in both static and incremental cases. We further show that the lessons learned in the declarative implementation can be equally applied to more traditional optimizer implementations.
A bat algorithm with mutation for UCAV path planning.
Wang, Gaige; Guo, Lihong; Duan, Hong; Liu, Luo; Wang, Heqi
2012-01-01
Path planning for uninhabited combat air vehicle (UCAV) is a complicated high dimension optimization problem, which mainly centralizes on optimizing the flight route considering the different kinds of constrains under complicated battle field environments. Original bat algorithm (BA) is used to solve the UCAV path planning problem. Furthermore, a new bat algorithm with mutation (BAM) is proposed to solve the UCAV path planning problem, and a modification is applied to mutate between bats during the process of the new solutions updating. Then, the UCAV can find the safe path by connecting the chosen nodes of the coordinates while avoiding the threat areas and costing minimum fuel. This new approach can accelerate the global convergence speed while preserving the strong robustness of the basic BA. The realization procedure for original BA and this improved metaheuristic approach BAM is also presented. To prove the performance of this proposed metaheuristic method, BAM is compared with BA and other population-based optimization methods, such as ACO, BBO, DE, ES, GA, PBIL, PSO, and SGA. The experiment shows that the proposed approach is more effective and feasible in UCAV path planning than the other models.
Enabling Incremental Query Re-Optimization
Liu, Mengmeng; Ives, Zachary G.; Loo, Boon Thau
2017-01-01
As declarative query processing techniques expand to the Web, data streams, network routers, and cloud platforms, there is an increasing need to re-plan execution in the presence of unanticipated performance changes. New runtime information may affect which query plan we prefer to run. Adaptive techniques require innovation both in terms of the algorithms used to estimate costs, and in terms of the search algorithm that finds the best plan. We investigate how to build a cost-based optimizer that recomputes the optimal plan incrementally given new cost information, much as a stream engine constantly updates its outputs given new data. Our implementation especially shows benefits for stream processing workloads. It lays the foundations upon which a variety of novel adaptive optimization algorithms can be built. We start by leveraging the recently proposed approach of formulating query plan enumeration as a set of recursive datalog queries; we develop a variety of novel optimization approaches to ensure effective pruning in both static and incremental cases. We further show that the lessons learned in the declarative implementation can be equally applied to more traditional optimizer implementations. PMID:28659658
FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butcher, T.; Swingle, R.; Crapse, K.
2011-01-01
The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SAmore » baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.« less
Ravankar, Abhijeet; Ravankar, Ankit A.; Kobayashi, Yukinori; Emaru, Takanori
2017-01-01
Hitchhiking is a means of transportation gained by asking other people for a (free) ride. We developed a multi-robot system which is the first of its kind to incorporate hitchhiking in robotics, and discuss its advantages. Our method allows the hitchhiker robot to skip redundant computations in navigation like path planning, localization, obstacle avoidance, and map update by completely relying on the driver robot. This allows the hitchhiker robot, which performs only visual servoing, to save computation while navigating on the common path with the driver robot. The driver robot, in the proposed system performs all the heavy computations in navigation and updates the hitchhiker about the current localized positions and new obstacle positions in the map. The proposed system is robust to recover from ‘driver-lost’ scenario which occurs due to visual servoing failure. We demonstrate robot hitchhiking in real environments considering factors like service-time and task priority with different start and goal configurations of the driver and hitchhiker robots. We also discuss the admissible characteristics of the hitchhiker, when hitchhiking should be allowed and when not, through experimental results. PMID:28809803
Ravankar, Abhijeet; Ravankar, Ankit A; Kobayashi, Yukinori; Emaru, Takanori
2017-08-15
Hitchhiking is a means of transportation gained by asking other people for a (free) ride. We developed a multi-robot system which is the first of its kind to incorporate hitchhiking in robotics, and discuss its advantages. Our method allows the hitchhiker robot to skip redundant computations in navigation like path planning, localization, obstacle avoidance, and map update by completely relying on the driver robot. This allows the hitchhiker robot, which performs only visual servoing, to save computation while navigating on the common path with the driver robot. The driver robot, in the proposed system performs all the heavy computations in navigation and updates the hitchhiker about the current localized positions and new obstacle positions in the map. The proposed system is robust to recover from `driver-lost' scenario which occurs due to visual servoing failure. We demonstrate robot hitchhiking in real environments considering factors like service-time and task priority with different start and goal configurations of the driver and hitchhiker robots. We also discuss the admissible characteristics of the hitchhiker, when hitchhiking should be allowed and when not, through experimental results.
High Skills, High Wages. Washington's Comprehensive Plan for Workforce Training and Education.
ERIC Educational Resources Information Center
Washington State Workforce Training and Education Coordinating Board, Olympia.
This document is the 1996 update to a 1994 Comprehensive Plan for Workforce Training and Education in Washington State. The plan focuses on collective actions that public and private sector partners need to take to have the best work force development system in the nation. The plan details how jobs are increasingly demanding higher-level skills,…
Region 10: Idaho Northern Ada County Adequate Letter (6/21/2013)
EPA approves motor vehicle emissions budget in the Northern Ada County PM10 State Implementation Plan, Maintenance Plan: Ten-Year Update for PM10 national ambient air quality standard, adequate for transportation conformity purposes.
Civil Space Technology Initiative: a First Step
NASA Technical Reports Server (NTRS)
1988-01-01
This is the first published overview of OAST's focused program, the Civil Space Technology Initiative, (CSTI) which started in FY88. This publication describes the goals, technical approach, current status, and plans for CSTI. Periodic updates are planned.
Iowa Department of Transportation strategic plan
DOT National Transportation Integrated Search
1999-08-01
This report presents the Iowa Department of Transportation's updated strategic plan - an action guide for today's decisions that will help the DOT carry out its objectives in the future and serve its customers with cost effectiveness and quality. The...
Recent Updates to the System Advisor Model (SAM)
DOE Office of Scientific and Technical Information (OSTI.GOV)
DiOrio, Nicholas A
The System Advisor Model (SAM) is a mature suite of techno-economic models for many renewable energy technologies that can be downloaded for free as a desktop application or software development kit. SAM is used for system-level modeling, including generating performance pro the release of the code as an open source project on GitHub. Other additions that will be covered include the ability to download data directly into SAM from the National Solar Radiation Database (NSRDB) and up- dates to a user-interface macro that assists with PV system sizing. A brief update on SAM's battery model and its integration with themore » detailed photovoltaic model will also be discussed. Finally, an outline of planned work for the next year will be presented, including the addition of a bifacial model, support for multiple MPPT inputs for detailed inverter modeling, and the addition of a model for inverter thermal behavior.« less
The impact of research-based learning on student’s academic performance and motivation
NASA Astrophysics Data System (ADS)
Sumbawati, M. S.; Anistyasari, Y.
2018-01-01
Undergraduate students often have difficulty in finding the updated research topic for their undergraduate thesis. This is due to students have less knowledge about research in a particular field because they are less familiar with scientific articles. This work, therefore, proposed an implementation of research-based learning and measured students’ academic performance and motivation. The study is conducted in four stages which are the plan, do, check, and act. Research-based learning is conducted based on its syntax. Paper and pencil test is then performed to measure students’ academic achievement and a survey is devoted to determining students’ academic motivation. The results show that most students obtain satisfied score and they feel comfortable to join a class with research-based learning.
Threatened and Endangered Species Habitat Management Plan for Los Alamos National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hathcock, Charles Dean; Keller, David Charles; Thompson, Brent E.
Los Alamos National Laboratory’s (LANL) Threatened and Endangered Species Habitat Management Plan (HMP) fulfills a commitment made to the U.S. Department of Energy (DOE) in the “Final Environmental Impact Statement for the Dual-Axis Radiographic Hydrodynamic Test Facility Mitigation Action Plan” (DOE 1996). The HMP received concurrence from the U.S. Fish and Wildlife Service (USFWS) in 1999 (USFWS consultation numbers 2-22-98-I-336 and 2-22-95-I-108). This 2017 update retains the management guidelines from the 1999 HMP for listed species, and updates some descriptive information.
Supplement to the 1975 report on active and planned spacecraft and experiments
NASA Technical Reports Server (NTRS)
Horowitz, R. (Editor); Davis, L. R. (Editor)
1975-01-01
A listing and brief description of spacecraft and experiments designed to update the January 1975 report on active and planned spacecraft and experiments to March 31, 1975 was presented. The information is given in two sections. In the first, spacecraft and experiments that have become known to NSSDC since the original report or that have changed significantly are described. In the second, an alphabetical listing is given for all spacecraft and experiments described in the first section and in the original report. It also updates status of operation and launch dates to March 31, 1975.
Kozar, Mark D.; Kahle, Sue C.
2013-01-01
This report documents the standard procedures, policies, and field methods used by the U.S. Geological Survey’s (USGS) Washington Water Science Center staff for activities related to the collection, processing, analysis, storage, and publication of groundwater data. This groundwater quality-assurance plan changes through time to accommodate new methods and requirements developed by the Washington Water Science Center and the USGS Office of Groundwater. The plan is based largely on requirements and guidelines provided by the USGS Office of Groundwater, or the USGS Water Mission Area. Regular updates to this plan represent an integral part of the quality-assurance process. Because numerous policy memoranda have been issued by the Office of Groundwater since the previous groundwater quality assurance plan was written, this report is a substantial revision of the previous report, supplants it, and contains significant additional policies not covered in the previous report. This updated plan includes information related to the organization and responsibilities of USGS Washington Water Science Center staff, training, safety, project proposal development, project review procedures, data collection activities, data processing activities, report review procedures, and archiving of field data and interpretative information pertaining to groundwater flow models, borehole aquifer tests, and aquifer tests. Important updates from the previous groundwater quality assurance plan include: (1) procedures for documenting and archiving of groundwater flow models; (2) revisions to procedures and policies for the creation of sites in the Groundwater Site Inventory database; (3) adoption of new water-level forms to be used within the USGS Washington Water Science Center; (4) procedures for future creation of borehole geophysics, surface geophysics, and aquifer-test archives; and (5) use of the USGS Multi Optional Network Key Entry System software for entry of routine water-level data collected as part of long-term water-level monitoring networks.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-28
... Interim Staff Guidance on Standard Review Plan, Section 17.4, ``Reliability Assurance Program'' AGENCY... design reliability assurance program (RAP). This ISG updates the guidance provided to the staff in Standard Review Plan (SRP), Section 17.4, ``Reliability Assurance Program,'' of NUREG-0800, ``Standard...
2004 Strategic Master Plan for Higher Education. Update on Implementation
ERIC Educational Resources Information Center
Washington Higher Education Coordinating Board, 2005
2005-01-01
The 2004 Strategic Master Plan for Higher Education identified clear and measurable goals that focused on outcomes rather than inputs alone. To reinforce this outcomes-based approach, the plan proposed that the state develop a new funding method to reward public colleges and universities for student success. Specifically, it proposed that the…
Merit Pay Plans for Teachers: Status and Descriptions. ERS Report.
ERIC Educational Resources Information Center
Educational Research Service, Arlington, VA.
This report, an update of the 1978 survey of national merit pay plans for teachers, provides descriptive data on currently operating merit pay plans and state level activities. Outlining current research, the report points out that neither a commonly acceptable definition of merit pay nor a generally acceptable method of determining meritorious…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-22
...). The Plan/DEIS evaluates four alternatives for updating the current approach to management in Golden.... In recognition of the complexity of the proposed plan alternatives, and with deference to interest... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO-1108-8862; 2031-A038-409] Draft...
24. PHOTOCOPY OF PLAN DRAWING. Quartermaster Research and Development Laboratory, ...
24. PHOTOCOPY OF PLAN DRAWING. Quartermaster Research and Development Laboratory, Natick, Mass, Climatic Building, First Floor Plan, Architectural. Drawing No. 35-07-01, Sheet 2 of 72, 1952, updated to 1985. (Source: NRDEC). - Natick Research & Development Laboratories, Climatic Chambers Building, U.S. Army Natick Research, Development & Engineering Center (NRDEC), Natick, Middlesex County, MA
An Enrollment Marketing Plan for Institutions of Higher Learning: An Update.
ERIC Educational Resources Information Center
Bingham, Frank G., Jr.
1996-01-01
A college marketing model consisting of several strategies and contingency plans for decision-making under difficult conditions is outlined. The plan provides for orderly transition from one marketing stage to the next logical stage, allowing some control over both internal and external environments, and providing insight into the delicate…
The Arthropod-Borne Animal Diseases Research Laboratory: Research Program: Update and Current Status
USDA-ARS?s Scientific Manuscript database
The ABADRL has three 5-year project plans under two ARS National Research Programs. One project plan under the Animal Health National Program is entitled “Countermeasures to control and eradicate Rift Valley fever (RVF)”. Research objectives in this plan are 1) to determine the vector competence of ...
Basic Training Course/Emergency Medical Technician (Second Edition). Instructor's Lesson Plan.
ERIC Educational Resources Information Center
National Highway Traffic Safety Administration (DOT), Washington, DC.
This document containing instructor lesson plans is one of three prepared to update a basic training program for emergency medical technicians (EMTs). (A course guide containing planning and management information and a study guide are available separately.) Material covers all emergency medical techniques currently considered to be within the…
A Report on Health Sciences Education Planning for California: 1980-1982.
ERIC Educational Resources Information Center
California State Postsecondary Education Commission, Sacramento.
Health sciences education planning for California for 1980-82 is examined. The adequacy of educational programs in meeting the needs of California for professional personnel in medicine, nursing, dentistry, pharmacy, and optometry is assessed. Data on enrollments and graduation rates in these fields are updated from the 1978 plan, and similar data…
ACHP | The Protection of Indian Sacred Sites
signatories issued an action plan for implementation of the MOU and in March 2014, issued a progress report , Action Plan, Progress Report, and other information may be accessed by clicking the links below: 2016 Action Plan ACHP News Announcement Department of the Interior Press Release DOI/Forest Service Updates
77 FR 24148 - Revision to the Hawaii State Implementation Plan, Minor New Source Review Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-23
... Hawaii State Implementation Plan, Minor New Source Review Program AGENCY: Environmental Protection Agency... final action to approve revisions to the Hawaii State Implementation Plan (SIP). These revisions would update and replace the minor new source review rules that EPA approved into the Hawaii SIP in 1983. DATES...
The Need to Update Space Planning Policies for the California Community Colleges. Fact Sheet 05-07
ERIC Educational Resources Information Center
California Postsecondary Education Commission, 2005
2005-01-01
California plans its development of public higher education facilities using policies called "space and utilization" guidelines and standards. These are budgetary planning tools that can measure existing and future need for academic spaces such as classrooms, laboratories, research space, and faculty offices. California's current space…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-17
... of the North and West Big Hole Allotment Management Plans (NWBH AMP's) project is the updating of eleven domestic livestock grazing management plans. The scope of the project is limited to the specific... River Ranger Districts; Montana; North and West Big Hole Allotment Management Plans AGENCY: Forest...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-19
...-2012-0011] Interagency Task Force on Antimicrobial Resistance (ITFAR): An Update of A Public Health...), Department of Health and Human Services (HHS). ACTION: Notice of public meeting and request for comments... Federal agencies in accomplishing activities outlined in ``A Public Health Action Plan to Combat...
42 CFR 495.340 - As-needed HIT PAPD update and as-needed HIT IAPD update requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.340 As... document or the HIT implementation advance planning document. (d) A change in implementation concept or a change to the scope of the project. (e) A change to the approved cost allocation methodology. ...
42 CFR 495.340 - As-needed HIT PAPD update and as-needed HIT IAPD update requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.340 As... document or the HIT implementation advance planning document. (d) A change in implementation concept or a change to the scope of the project. (e) A change to the approved cost allocation methodology. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-05
... projections models, as well as changes to future vehicle mix assumptions, that influence the emission... methodology that may occur in the future such as updated socioeconomic data, new models, and other factors... updated mobile emissions model, the Motor Vehicle Emissions Simulator (also known as MOVES2010a), and to...
[Activities of System Studies and Simulation, Inc.
NASA Technical Reports Server (NTRS)
2004-01-01
Contents include the following: 1. Launch Vehicle Interface Work Performed: a. S3 provided to KSC the new launch inclination targets needed for the April '04 launch date. 2. Prelaunch operations work performed: a. S3 updated the staffing plan for MSFC on-console personnel\\during the Final Countdown prior to launch. 3. Software Assessment Work Performed: a. S3 evaluated and recommended approval for Program Control Board (PCB) proposed change 649 for ground software changes, as well as change 650 and 650A for Stored Program Commands. 4. Education and Public Outreach Work Performed: a. S3 continues to coordinate the effort for the design and fabrication of scale models of the GP-3 for use at the launch site, education forums, and management/technical briefings. S3 also prepared a Change Request for additional funds needed for fabrication of additional scale models. S3 drafted the planned uses of these models, including the possibility of participation in the Boston, MA showings of the traveling Einstein Exhibit. 5. Program Management Support Work Performed: a. S3 prepared the input for and closed three MSFC Centerwide Action Item Tracking Systems (CAITS) actions during this period.
Effects of task repetition but no transfer of inhibitory control training in healthy adults.
Talanow, Tobias; Ettinger, Ulrich
2018-06-01
Executive functions (EFs) comprise the updating, shifting and inhibition dimensions. According to the Unity and Diversity Model, the inhibition dimension is fully accounted for by a general EFs factor. This suggests that training of inhibition should transfer, in part, to updating and shifting. Therefore, we tested the effectiveness of a three-week inhibition training (high-conflict Stroop task) and explored near transfer effects to an untrained inhibition task (antisaccade task) and far transfer effects to untrained tasks demanding task-set shifting (number-letter-task), working memory updating (n-back task) and planning abilities (Stockings of Cambridge task). We employed a randomized pretest/treatment/posttest study design in n = 102 healthy young adults, assigned to an intensive Stroop training (n = 38), an active control condition (n = 34) or no training intervention (n = 30). In the Stroop training group, Stroop performance improved with practice, while performance in the active control group remained unchanged. The Stroop training group showed improvements in overall Stroop task performance from pretest to posttest, but we observed neither near nor far transfer effects. Additionally, specifically stronger gains on incongruent Stroop trials compared to congruent trials were observed in the Stroop training group when color bar trials were excluded from the pretest-posttest-analysis. Generally, there were substantial improvements from pretest to posttest independent of training condition in all transfer tasks. In sum, our data do not support the existence of transfer effects from inhibition training in healthy young adults. Copyright © 2018 Elsevier B.V. All rights reserved.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY PLANNING..., interstate, areawide and regional and local CWA water quality planning and management activities undertaken on or after February 11, 1985 including all updates and continuing certifications for approved Water...
Los Alamos National Laboratory SAVY-4000 Field Surveillance Plan Update for 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelly, Elizabeth J.; Stone, Timothy Amos; Smith, Paul Herrick
The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” The Los Alamos National Laboratory (LANL) SAVY-4000 Field Surveillance Plan was first issued in FY 2013 (Kelly et al. 2013). The surveillance plan is reviewed annually and updated as necessary based on SAVY-4000 surveillance and other surveillance findings, as well as results of the lifetime extension studies (Blair et al. 2012, Weis et al. 2015a).more » The LANL SAVY-4000 Field Surveillance Plan Update was issued in 2014 (Kelly et al. 2014). This 2016 update reflects changes to the surveillance plan resulting from restrictions on handling residue materials greater than 500 g, the addition of specific engineering judgment containers, and 2015 surveillance findings. The SAVY-4000 container has a design life of five years, which was chosen as a conservative estimate of the functional properties of the materials used in the construction of the SAVY 4000 when exposed to the potential insults including temperature, corrosive materials and gases, and radiation. The SAVY-4000 container design basis is described in a safety analysis report (Anderson et al. 2013). In the National Nuclear Security Administration's (NNSA’s) approval of the safety analysis report, it was recommended that the design life clock begin on March 2014 (Nez et al. 2014). However, it is expected that a technical basis can be developed to extend the design life of the SAVY-4000 containers to approximately 40 years (Blair et al. 2012, Weis et al. 2015a). This surveillance plan update covers five years (2015–2019) and is developed to ensure SAVY-4000 containers meet their design criteria over the current five-year design life and to gather data that can be used in developing the technical basis for a 40-year design life. The technical basis for the longer design life will be developed based on the results of this surveillance plan and the concurrent lifetime extension studies (Blair et al. 2012, Weis et al. 2015a). A long-term surveillance plan will be developed by the completion of this plan and will be based on the results of the first several years of this five-year surveillance plan and the lifetime extension studies. In addition, the current Hagan container population is so large (approximately 3,500 LANL-wide, approximately 3,000 in PF-4) that it is anticipated Hagan containers will be in use for many years to come. Therefore, this plan includes surveillance activities for the Hagan container system during the time it takes to replace the Hagan containers with manually-compliant containers such as the SAVY 4000. These Hagan examinations not only provide information to determine if additional Hagan surveillance is needed, but also support SAVY lifetime-extension studies because some of the container components are made from similar material (e.g., stainless steel and Viton).« less
Extending ACTS Operations Through a University-Based Consortium
NASA Technical Reports Server (NTRS)
Bauer, Robert; Krawcyzk, Richard; Irwin, Dennis; Kruse, Hans
2001-01-01
The Advanced Communications Technology Satellite (ACTS) program was slated for decommissioning in October 2000 as was announced at the 6th Ka-band Utilization Conference in May 2000. Quite a celebration was had at that event too centering on the decommissioning of this very successful technology program. With plans in place to move the spacecraft to an orbital graveyard and then shut the system down, NASA was challenged to consider the feasibility of extending operations for education and research purposes provided that an academic organization would be willing to cover operations costs. Continuing operations of the system was determined viable and in the fall of 2000, an announcement was made by NASA to consider extending operations. Plans are now in place to continue the operations of ACTS through a university-based consortium led by Ohio University, Athens, Ohio. Initial plans are for two more years of operations, with options to extend up to a total of four years. This paper will present the change in plans to continue operations of ACTS. A description of the multi-month transition of the spacecraft to its new and final orbital location is provided. With the spacecraft at this new location, an update on its performance is presented as well as estimates of long-term performance. The consortium development will be presented along with its organization, membership, and operations plans for using ACTS.
NREL Updates Baseline Cost and Performance Data for Electricity Generation
Technologies | News | NREL Updates Baseline Cost and Performance Data for Electricity Generation Technologies News Release: NREL Updates Baseline Cost and Performance Data for Electricity generation technology cost and performance data used to support and inform electric sector analysis in the
ERIC Educational Resources Information Center
Human Resources Development Canada, Ottawa (Ontario).
This updated guide is designed to help students in Alberta, Canada, plan and finance postsecondary education. A student who has made financial plans will have more options when it is time to choose an institution for postsecondary education. How to choose the right school depends on what a student wants from education and what he or she plans for…
NASA Technical Reports Server (NTRS)
1977-01-01
A method was developed for using the NASA aviation data base and computer programs in conjunction with the GE management analysis and projection service to perform simple and complex economic analysis for planning, forecasting, and evaluating OAST programs. Capabilities of the system are discussed along with procedures for making basic data tabulations, updates and entries. The system is applied in an agricultural aviation study in order to assess its value for actual utility in the OAST working environment.
Japan's launch vehicle program update
NASA Astrophysics Data System (ADS)
Tadakawa, Tsuguo
1987-06-01
NASDA is actively engaged in the development of H-I and H-II launch vehicle performance capabilities in anticipation of future mission requirements. The H-I has both two-stage and three-stage versions for medium-altitude and geosynchronous orbits, respectively; the restart capability of the second stage affords considerable mission planning flexibility. The H-II vehicle is a two-stage liquid rocket primary propulsion design employing two solid rocket boosters for secondary power; it is capable of launching two-ton satellites into geosynchronous orbit, and reduces manufacture and launch costs by extensively employing off-the-shelf technology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Learnings Objectives: Although brachytherapy is the oldest form of radiation therapy, the rapid advancement of the methods of dose calculation, treatment planning and treatment delivery pushes us to keep updating our knowledge and experience to new procedures all the time. Our purpose is to present the newest applicators used in Accelerated Partial Breast Irradiation (APBI) and the techniques of using them for a maximum effective treatment. Our objective will be to get the user familiar with the Savi, Contura and ML Mammosite from the detailed description and measurements to cavity eval and choice or size, to acceptance tests and usemore » of each. At the end of the session the attendants will be able to assist at the scanning of the patient for the first treatment, decide on the proper localization and immobilization devices, import the scans in the treatment planning system, perform the structure segmentation, reconstruct the catheters and develop a treatment plan using inverse planning (IPSA) or volume optimization. The attendant should be able to evaluate the quality of a treatment plan according to the ABS protocols and B39 after this session. Our goal is that all the attendants to gain knowledge of all the quality assurance procedures required to be performed prior to a treatment, at the beginning of a treatment day, weekly, monthly and annualy on the remote afterloader, the treatment planning system and the secondary check system. We will provide tips for a consistent treatment delivery of the 10 fractions in a BID (twice daily) regimen.« less
Path-following control of wheeled planetary exploration robots moving on deformable rough terrain.
Ding, Liang; Gao, Hai-bo; Deng, Zong-quan; Li, Zhijun; Xia, Ke-rui; Duan, Guang-ren
2014-01-01
The control of planetary rovers, which are high performance mobile robots that move on deformable rough terrain, is a challenging problem. Taking lateral skid into account, this paper presents a rough terrain model and nonholonomic kinematics model for planetary rovers. An approach is proposed in which the reference path is generated according to the planned path by combining look-ahead distance and path updating distance on the basis of the carrot following method. A path-following strategy for wheeled planetary exploration robots incorporating slip compensation is designed. Simulation results of a four-wheeled robot on deformable rough terrain verify that it can be controlled to follow a planned path with good precision, despite the fact that the wheels will obviously skid and slip.
Path-Following Control of Wheeled Planetary Exploration Robots Moving on Deformable Rough Terrain
Ding, Liang; Gao, Hai-bo; Deng, Zong-quan; Li, Zhijun; Xia, Ke-rui; Duan, Guang-ren
2014-01-01
The control of planetary rovers, which are high performance mobile robots that move on deformable rough terrain, is a challenging problem. Taking lateral skid into account, this paper presents a rough terrain model and nonholonomic kinematics model for planetary rovers. An approach is proposed in which the reference path is generated according to the planned path by combining look-ahead distance and path updating distance on the basis of the carrot following method. A path-following strategy for wheeled planetary exploration robots incorporating slip compensation is designed. Simulation results of a four-wheeled robot on deformable rough terrain verify that it can be controlled to follow a planned path with good precision, despite the fact that the wheels will obviously skid and slip. PMID:24790582
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-23
... activities and future updates to the recovery plan. Large-scale loss and fragmentation of native shrub steppe... threats to the population and potentially suitable shrub-steppe habitats in the Columbia Basin; (2...
33 CFR 385.30 - Master Implementation Sequencing Plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... projects of the Plan, including pilot projects and operational elements, based on the best scientific... Florida Water Management District shall also consult with the South Florida Ecosystem Restoration Task...; (ii) Information obtained from pilot projects; (iii) Updated funding information; (iv) Approved...
Applying Modern Marketing Concepts to Military Recruiting
2000-03-03
new to military recruiting or are an updated version of currently used concepts. The concepts and systems include social marketing, marketing ... research , market planning and product development, pricing and management. New simulated application including a strategic planning war game and a simulated
Louisiana Airport System Plan aviation activity forecasts 1990-2010.
DOT National Transportation Integrated Search
1991-07-01
This report documents the methodology used to develop the aviation activity forecasts prepared as a part of the update to the Louisiana Airport System Plan and provides Louisiana aviation forecasts for the years 1990 to 2010. In general, the forecast...
SOFIA Update and Science Vision
NASA Technical Reports Server (NTRS)
Smith, Kimberly
2017-01-01
I will present an overview of the SOFIA program, its science vision and upcoming plans for the observatory. The talk will feature several scientific highlights since full operations, along with summaries of planned science observations for this coming year, platform enhancements and new instrumentation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, Richard; Lemke, Peter
The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells as listed in Table 1. The data from this sampling eventmore » are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, Richard; Lemke, Peter
The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells and extraction wells as listed in Table 1. The data frommore » this sampling event are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dominick, F.; Lockwood, R.A.
1986-07-01
The US Army Aviation Engineering Flight Activity conducted an evaluation of Flight Management Calculator for the UH-1H. The calculator was a Hewlett-Packard HP-41CV. The performance calculator was evaluated for flight planning and in-flight use during 14 mission flights simulating operational conditions. The calculator was much easier to use in-flight than the operator's manual data. The calculator program needs improvement in the areas of pre-flight planning and execution speed. The mission flights demonstrated a 19% fuel saving using optimum over normal flight profiles in warm temperatures (15/sup 0/C above standard). Savings would be greater at colder temperatures because of increasing compressibilitymore » effects. Acceptable accuracy for individual aircraft under operational conditions may require a regressive analog model in which individual aircraft data are used to update the program. The performance data base for the UH-1H was expanded with level flight and hover data to thrust coefficients and Mach numbers to the practical limits of aircraft operation.« less
NASA Technical Reports Server (NTRS)
Cake, J. E.; Regetz, J. D., Jr.
1975-01-01
A method is presented for open loop guidance of a solar electric propulsion spacecraft to geosynchronous orbit. The method consists of determining the thrust vector profiles on the ground with an optimization computer program, and performing updates based on the difference between the actual trajectory and that predicted with a precision simulation computer program. The motivation for performing the guidance analysis during the mission planning phase is discussed, and a spacecraft design option that employs attitude orientation constraints is presented. The improvements required in both the optimization program and simulation program are set forth, together with the efforts to integrate the programs into the ground support software for the guidance system.
NASA Technical Reports Server (NTRS)
Cake, J. E.; Regetz, J. D., Jr.
1975-01-01
A method is presented for open loop guidance of a solar electric propulsion spacecraft to geosynchronsus orbit. The method consists of determining the thrust vector profiles on the ground with an optimization computer program, and performing updates based on the difference between the actual trajectory and that predicted with a precision simulation computer program. The motivation for performing the guidance analysis during the mission planning phase is discussed, and a spacecraft design option that employs attitude orientation constraints is presented. The improvements required in both the optimization program and simulation program are set forth, together with the efforts to integrate the programs into the ground support software for the guidance system.
Use of Web Technology to Access and Update College Plans
ERIC Educational Resources Information Center
Valeau, Edward J.; Luan, Jing
2007-01-01
In this study, the process and outcome of a web-based planning application, called Ports of Call, are discussed. The application allows college management to create, edit, and report out activities relating to college plans, all through a web browser. Its design was based on best practices in modern web technology and the application can be easily…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turner, L.R.; Praeg, W.F.
1982-03-01
The experimental requirements, test-bed design, and computational requirements are reviewed and updated. Next, in Sections 3, 4 and 5, the experimental plan, instrumentation, and computer plan, respectively, are described. Finally, Section 6 treats other considerations, such as personnel, outside participation, and distribution of results.
Family Planning in Five Continents: Africa, America, Asia, Europe, Oceania. December 1976 Update.
ERIC Educational Resources Information Center
International Planned Parenthood Federation, London (England).
This document gives highlights of the family planning situation in many countries of the world. Its purpose is to provide a quick reference source for those who work in family planning. Population statistics are included for five continents and many countries. Data for the continents include population in 1976, projected population in 2000,…
29 CFR 4281.44 - Contents of notices of insolvency and annual updates.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (determined without regard to the insolvency) for the insolvency year. (10) The estimated amount of the plan's available resources for the insolvency year. (11) The estimated amount of the annual benefits guaranteed by... termination pursuant to part 4041A, subparts A and B, of this chapter. (6) The plan year for which the plan...
29 CFR 4281.44 - Contents of notices of insolvency and annual updates.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (determined without regard to the insolvency) for the insolvency year. (10) The estimated amount of the plan's available resources for the insolvency year. (11) The estimated amount of the annual benefits guaranteed by... termination pursuant to part 4041A, subparts A and B, of this chapter. (6) The plan year for which the plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-08
.... ACTION: Standard review plan section; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a new section of NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for... impacts.'' DATES: The effective date of this Standard Review Plan (SRP) update is June 7, 2013. ADDRESSES...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Werling, Eric
This report presents the Building America Research-to-Market Plan (Plan), including the integrated Building America Technology-to-Market Roadmaps (Roadmaps) that will guide Building America’s research, development, and deployment (RD&D) activities over the coming years. The Plan and Roadmaps will be updated as necessary to adapt to research findings and evolving stakeholder needs, and they will reflect input from DOE and stakeholders.
77 FR 71427 - National Institute of Mental Health; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-30
... U.S.C. App.), notice is hereby given of a conference call meeting of the Interagency Autism... final IACC Strategic Plan for Autism Spectrum Disorder Research 2012 Update. These updates will describe recent progress that has been made in the autism field as well as any new gap areas in research that have...
76 FR 53137 - Board of Scientific Counselors, National Center for Health Statistics, (BSC, NCHS)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-25
... Regulation, Subpart 101-20.301, all persons entering in or on Federal controlled property and their packages... Discussed: The agenda will include welcome remarks by the Director, NCHS; update on the Health Indicators Warehouse; update on program reviews; discussion of the NHANES program, plans for the NHIS for 2012 and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-15
... Resource Management, to EPA in two separate SIP revisions on October 19, 2007, and July 1, 2011. These SIP...) Implementation Rule NSR Update Phase II (hereafter referred to as the ``Ozone Implementation NSR Update'' or ``Phase II Rule'') recognizing nitrogen oxide (NO X ) as an ozone precursor, among other requirements. In...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-05
... Management to EPA in two separate SIP revisions on October 19, 2007, and July 1, 2011. These SIP revisions... Rule NSR Update Phase II (hereafter referred to as the ``Ozone Implementation NSR Update'' or ``Phase..., Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61...
ERIC Educational Resources Information Center
Mickelson, Roslyn Arlin
2016-01-01
Some sixty years after the 1954 "Brown" decision declared separate schooling inherently unequal, America's student population is much larger and more demographically diverse. For many decades court mandated desegregation plans were implemented, but today public schools are again largely segregated by race, ethnicity, and family…
Overview and Evaluation of the Community Multiscale Air Quality (CMAQ) Modeling System Version 5.2
A new version of the Community Multiscale Air Quality (CMAQ) model, version 5.2 (CMAQv5.2), is currently being developed, with a planned release date in 2017. The new model includes numerous updates from the previous version of the model (CMAQv5.1). Specific updates include a new...
The CPAT 2.0.2 Domain Model - How CPAT 2.0.2 "Thinks" From an Analyst Perspective.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waddell, Lucas; Muldoon, Frank; Melander, Darryl J.
To help effectively plan the management and modernization of their large and diverse fleets of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) and the Program Executive Office Combat Support and Combat Service Support (PEO CS &CSS) commissioned the development of a large - scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This reportmore » contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets. This report, which is an update to the original CPAT domain model published in 2015 (SAND2015 - 4009), covers important new CPAT features. This page intentionally left blank« less
Memory Updating and Mental Arithmetic
Han, Cheng-Ching; Yang, Tsung-Han; Lin, Chia-Yuan; Yen, Nai-Shing
2016-01-01
Is domain-general memory updating ability predictive of calculation skills or are such skills better predicted by the capacity for updating specifically numerical information? Here, we used multidigit mental multiplication (MMM) as a measure for calculating skill as this operation requires the accurate maintenance and updating of information in addition to skills needed for arithmetic more generally. In Experiment 1, we found that only individual differences with regard to a task updating numerical information following addition (MUcalc) could predict the performance of MMM, perhaps owing to common elements between the task and MMM. In Experiment 2, new updating tasks were designed to clarify this: a spatial updating task with no numbers, a numerical task with no calculation, and a word task. The results showed that both MUcalc and the spatial task were able to predict the performance of MMM but only with the more difficult problems, while other updating tasks did not predict performance. It is concluded that relevant processes involved in updating the contents of working memory support mental arithmetic in adults. PMID:26869971
NASA Technical Reports Server (NTRS)
Chien, Steve A.
1996-01-01
A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintainting the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems. This paper describes a planning application of automated imaging processing and our overall approach to knowledge acquisition for this application.
Progress on Updating the 1961-1990 National Solar Radiation Database
NASA Technical Reports Server (NTRS)
Renne, D.; Wilcox, S.; Marion, B.; George, R.; Myers, D.
2003-01-01
The 1961-1990 National Solar Radiation Data Base (NSRDB) provides a 30-year climate summary and solar characterization of 239 locations throughout the United States. Over the past several years, the National Renewable Energy Laboratory (NREL) has received numerous inquiries from a range of constituents as to whether an update of the database to include the 1990s will be developed. However, there are formidable challenges to creating an update of the serially complete station-specific database for the 1971-2000 period. During the 1990s, the National Weather Service changed its observational procedures from a human-based to an automated system, resulting in the loss of important input variables to the model used to complete the 1961-1990 NSRDB. As a result, alternative techniques are required for an update that covers the 1990s. This paper examines several alternative approaches for creating this update and describes preliminary NREL plans for implementing the update.
48 CFR 1318.270 - Emergency acquisition flexibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Procurement Executive. (b) Continuity of Operations Plan. Each Contracting Activity shall have an updated Continuity of Operations Plan, in place designating emergency personnel with warrant levels. (c) Management... appropriate management controls are established and maintained to support the use of the increased thresholds...
A Management Plan for Historic Bridges in Virginia : The 2017 Update
DOT National Transportation Integrated Search
2018-04-01
A Management Plan for Historic Bridges in Virginia, published in 2001, identified the management and treatment needs for 55 historic bridges in Virginia (i.e., bridges that were individually eligible for or listed on the National Register of Historic...
Alligator, Alligator mississippiensis, habitat suitability index model
Waddle, J. Hardin
2017-01-01
The 2012 Coastal Master Plan utilized Habitat Suitability Indices (HSIs) to evaluate potential project effects on wildlife species. Even though HSIs quantify habitat condition, which may not directly correlate to species abundance, they remain a practical and tractable way to assess changes in habitat quality from various restoration actions. As part of the legislatively mandated five year update to the 2012 plan, the wildlife habitat suitability indices were updated and revised using literature and existing field data where available. The outcome of these efforts resulted in improved, or in some cases entirely new suitability indices. This report describes the development of the habitat suitability indices for the American alligator, Alligator mississippiensis.
Space Construction Experiment Definition Study (SCEDS), part 2. Volume 2: Study results
NASA Technical Reports Server (NTRS)
1982-01-01
The Space Construction Experiment (SCE) was defined for integration into the Space Shuttle. This included development of flight assignment data, revision and update of preliminary mission timelines and test plans, analysis of flight safety issues, and definition of ground operations scenarios. New requirements for the flight experiment and changes for a large space antenna feed mask test article were incorporated. The program plan and cost estimates were updated. Revised SCE structural dynamics characteristics were provided for simulation and analysis of experimental tests to define and verify control limits and interactions effects between the SCE and the Orbiter digital automatic pilot.
Timing considerations of Helmet Mounted Display performance
NASA Technical Reports Server (NTRS)
Tharp, Gregory; Liu, Andrew; French, Lloyd; Lai, Steve; Stark, Lawrence
1992-01-01
The Helmet Mounted Display (HMD) system developed in our lab should be a useful teleoperator systems display if it increases operator performance of the desired task; it can, however, introduce degradation in performance due to display update rate constraints and communication delays. Display update rates are slowed by communication bandwidth and/or computational power limitations. We used simulated 3D tracking and pick-and-place tasks to characterize performance levels for a range of update rates. Initial experiments with 3D tracking indicate that performance levels plateau at an update rate between 10 and 20 Hz. We have found that using the HMD with delay decreases performance as delay increases.
Motivation and Design of the Sirocco Storage System Version 1.0.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curry, Matthew Leon; Ward, H. Lee; Danielson, Geoffrey Charles
Sirocco is a massively parallel, high performance storage system for the exascale era. It emphasizes client-to-client coordination, low server-side coupling, and free data movement to improve resilience and performance. Its architecture is inspired by peer-to-peer and victim- cache architectures. By leveraging these ideas, Sirocco natively supports several media types, including RAM, flash, disk, and archival storage, with automatic migration between levels. Sirocco also includes storage interfaces and support that are more advanced than typical block storage. Sirocco enables clients to efficiently use key-value storage or block-based storage with the same interface. It also provides several levels of transactional data updatesmore » within a single storage command, including full ACID-compliant updates. This transaction support extends to updating several objects within a single transaction. Further support is provided for con- currency control, enabling greater performance for workloads while providing safe concurrent modification. By pioneering these and other technologies and techniques in the storage system, Sirocco is poised to fulfill a need for a massively scalable, write-optimized storage system for exascale systems. This is version 1.0 of a document reflecting the current and planned state of Sirocco. Further versions of this document will be accessible at http://www.cs.sandia.gov/Scalable_IO/ sirocco .« less
An Integrated Extravehicular Activity Research Plan
NASA Technical Reports Server (NTRS)
Abercromby, Andrew F. J.; Ross, Amy J.; Cupples, J. Scott
2016-01-01
Multiple organizations within NASA and outside of NASA fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Research Plan will be conducted annually. External peer review of all HRP EVA research activities including compilation and review of published literature in the EVA Evidence Book is already performed annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the current Integrated EVA Research Plan are presented including description of ongoing and planned research activities in the areas of: Benchmarking; Anthropometry and Suit Fit; Sensors; Human-Suit Modeling; Suit Trauma Monitoring and Countermeasures; EVA Workload and Duration Effects; Decompression Sickness Risk Mitigation; Deconditioned EVA Performance; and Exploration EVA Concept of Operations.
Hegde, John V.; Mulkern, Robert V.; Panych, Lawrence P.; Fennessy, Fiona M.; Fedorov, Andriy; Maier, Stephan E.; Tempany, Clare M.C.
2013-01-01
Magnetic resonance (MR) examinations of men with prostate cancer are most commonly performed for detecting, characterizing, and staging the extent of disease to best determine diagnostic or treatment strategies, which range from biopsy guidance to active surveillance to radical prostatectomy. Given both the exam's importance to individual treatment plans and the time constraints present for its operation at most institutions, it is essential to perform the study effectively and efficiently. This article reviews the most commonly employed modern techniques for prostate cancer MR examinations, exploring the relevant signal characteristics from the different methods discussed and relating them to intrinsic prostate tissue properties. Also, a review of recent articles using these methods to enhance clinical interpretation and assess clinical performance is provided. PMID:23606141
Transfusion service disaster planning.
Bundy, K L; Foss, M L; Stubbs, J R
2008-01-01
The Mayo Clinic, in Rochester, Minnesota, recently set forth a directive to develop a Mayo Emergency Incident Command System (MEICS) plan to respond to major disasters. The MEICS plan that was developed interfaces with national response plans to ensure effective communication and coordination between our institution and local, state, and federal agencies to establish a common language and communication structure. The MEICS plan addresses multiple aspects of dealing with resource needs during a crisis, including the need for blood and transfusion medicine services. The MEICS plan was developed to supplement our current local emergency preparedness procedures and provide a mechanism for responding to the escalating severity of an emergency to deal with situations of a magnitude that is outside the normal experience. A plan was developed to interface the existing Transfusion Medicine disaster plan standard operating procedures (SOP) with the institutional and Department of Laboratory Medicine (DLMP) MEICS plans. The first step in developing this interface was defining MEICS. Other major steps were defining the chain of command, developing a method for visually indicating who is "in charge," planning communication, defining the actions to be taken, assessing resource needs, developing flowcharts and updating SOPs, and developing a blood rationing team to deal with anticipated blood shortages. Several key features of the interface and updated disaster plan that were developed are calling trees for response personnel, plans for relocating leadership to alternative command centers, and action sheets to assist with resource assessment. The action sheets also provide documentation of key actions by response personnel.
Muñoz Ladrón de Guevara, Cristina; Fernández-Serrano, María José; Reyes Del Paso, Gustavo A; Duschek, Stefan
2018-01-01
Several investigations suggest the presence of deterioration of executive function in fibromyalgia syndrome (FMS). The study quantified executive functions in patients with FMS. A wide array of functions was assessed, including updating, shifting and inhibition, as well as decision making and mental planning. Moreover, clinical variables were investigated as possible mediators of executive dysfunction, including pain severity, psychiatric comorbidity, medication and body mass index (BMI). Fifty-two FMS patients and 32 healthy controls completed a battery of 14 neuropsychological tests. Clinical interviews were conducted and the McGill Pain Questionnaire, Beck Depression Inventory, State-Trait Anxiety Inventory, Fatigue Severity Scale and Oviedo Quality of Sleep Questionnaire were presented. Patients performed poorer than controls on the Letter Number Sequencing, Arithmetic and Similarities subtests of the Wechsler Adult Intelligence Scale, the Spatial Span subtest of the Wechsler Memory Scale, an N-back task, a verbal fluency task, the Ruff Figural Fluency Test, the Inhibition score of the Stroop Test, the Inhibition and Shifting scores of the Five Digits Test, the Key Search Test and the Zoo Map Task. Moreover, patients exhibited less steep learning curves on the Iowa Gambling Task. Among clinical variables, BMI and pain severity explained the largest proportion of performance variance. This study demonstrated impairments in executive functions of updating, shifting inhibition, decision making and planning in FMS. While the mediating role of pain in cognitive impairments in FMS had been previously established, the influence of BMI is a novel finding. Overweight and obesity should be considered by FMS researchers, and in the treatment of the condition.
2018-01-01
Background Several investigations suggest the presence of deterioration of executive function in fibromyalgia syndrome (FMS). The study quantified executive functions in patients with FMS. A wide array of functions was assessed, including updating, shifting and inhibition, as well as decision making and mental planning. Moreover, clinical variables were investigated as possible mediators of executive dysfunction, including pain severity, psychiatric comorbidity, medication and body mass index (BMI). Methods Fifty-two FMS patients and 32 healthy controls completed a battery of 14 neuropsychological tests. Clinical interviews were conducted and the McGill Pain Questionnaire, Beck Depression Inventory, State-Trait Anxiety Inventory, Fatigue Severity Scale and Oviedo Quality of Sleep Questionnaire were presented. Results Patients performed poorer than controls on the Letter Number Sequencing, Arithmetic and Similarities subtests of the Wechsler Adult Intelligence Scale, the Spatial Span subtest of the Wechsler Memory Scale, an N-back task, a verbal fluency task, the Ruff Figural Fluency Test, the Inhibition score of the Stroop Test, the Inhibition and Shifting scores of the Five Digits Test, the Key Search Test and the Zoo Map Task. Moreover, patients exhibited less steep learning curves on the Iowa Gambling Task. Among clinical variables, BMI and pain severity explained the largest proportion of performance variance. Conclusions This study demonstrated impairments in executive functions of updating, shifting inhibition, decision making and planning in FMS. While the mediating role of pain in cognitive impairments in FMS had been previously established, the influence of BMI is a novel finding. Overweight and obesity should be considered by FMS researchers, and in the treatment of the condition. PMID:29694417
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alkhatib, H; Oves, S
Purpose: To demonstrate a quick and comprehensive method verifying the accuracy of the updated dose model by recalculating dose distribution in an anthropomorphic phantom with a new version of the TPS and comparing the results to measured values. Methods: CT images and IMRT plan of an RPC anthropomorphic head phantom, previously calculated by Pinnacle 9.0, was re-computed using Pinnacle 9.2 and 9.6. The dosimeters within the phantom include four TLD capsules representing a primary PTV, two TLD capsules representing a secondary PTV, and two TLD capsules representing an organ at risk. Also included were three sheets of Gafchromic film. Performancemore » of the updated TPS version was assessed by recalculating point doses and dose profiles corresponding to TLD and film position respectively and then comparing the results to reported values by the RPC. Results: Comparing calculated doses to reported measured doses from the RPC yielded an average disagreement of 1.48%, 2.04% and 2.10% for versions 9.0, 9.2, 9.6 respectively. Computed doses points all meet the RPC's passing criteria with the exception of the point representing the superior organ at risk in version 9.6. However, qualitative analysis of the recalculated dose profiles showed improved agreement with those of the RPC, especially in the penumbra region. Conclusion: This work has demonstrated the calculation results of Pinnacle 9.2 and 9.6 vs 9.0 version. Additionally, this study illustrates a method for the user to gain confidence upgrade to a newer version of the treatment planning system.« less
Software Engineering Improvement Plan
NASA Technical Reports Server (NTRS)
2006-01-01
In performance of this task order, bd Systems personnel provided support to the Flight Software Branch and the Software Working Group through multiple tasks related to software engineering improvement and to activities of the independent Technical Authority (iTA) Discipline Technical Warrant Holder (DTWH) for software engineering. To ensure that the products, comments, and recommendations complied with customer requirements and the statement of work, bd Systems personnel maintained close coordination with the customer. These personnel performed work in areas such as update of agency requirements and directives database, software effort estimation, software problem reports, a web-based process asset library, miscellaneous documentation review, software system requirements, issue tracking software survey, systems engineering NPR, and project-related reviews. This report contains a summary of the work performed and the accomplishments in each of these areas.
Capital planning for operating theatres based on projecting future theatre requirements.
Sheehan, Jennifer A; Tyler, Peter; Jayasinha, Hirani; Meleady, Kathleen T; Jones, Neill
2011-05-01
During 2006, NSW and ACT Health Departments jointly engaged KPMG to develop an Operating Theatre Requirements' Projection Model and an accompanying planning guideline. A research scan was carried out to identify drivers of surgical demand, theatre capacity and theatre performance, as well as locating existing approaches to modelling operating theatre requirements for planning purposes. The project delivered a Microsoft Excel-based model for projecting future operating theatre requirements, together with an accompanying guideline for use of the model and interpretation of its outputs. It provides a valuable addition to the suite of tools available to Health staff for service and capital planning. The model operates with several limitations, largely due to being data dependent, and the state and completeness of available theatre activity data. However, the operational flexibility built into the model allows users to compensate for these limitations, on a case by case basis, when the user has access to suitable, local data. The design flexibility of the model means that updating the model as improved data become available is not difficult; resulting in revisions being able to be made quickly, and disseminated to users rapidly.
Data Validation Package - July 2016 Groundwater Sampling at the Gunnison, Colorado, Disposal Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linard, Joshua; Campbell, Sam
Groundwater sampling at the Gunnison, Colorado, Disposal Site is conducted every 5 years to monitor disposal cell performance. During this event, samples were collected from eight monitoring wells as specified in the 1997 Long-Term Surveillance Plan for the Gunnison, Colorado, Disposal Site. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and analysis-plan-us-department-energy-office-legacy-management-sites). Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0723. Water levels were measured at all monitoring wells thatmore » were sampled and seven additional wells. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that require additional action or follow-up.« less
Kennedy Space Center Director Update
2014-03-06
CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during KSC Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper
Kennedy Space Center Director Update
2014-03-06
CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-02
... Emissions From Industrial Process Operations New Castle County.'' 12. Regulation 1112 ``Control of Nitrogen... the State Implementation Plans.'' 25. Regulation 1139 ``Nitrogen Oxides (NO X ) Budget Trading Program... by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter...
Code of Federal Regulations, 2011 CFR
2011-04-01
... been taken in accordance with the strategic plan and provide notice of updates and modifications to the strategic plan. In addition to these reports, such other information relating to designated Empowerment... required to submit in accordance with this part. (Approved by the Office of Management and Budget under...
Faunt, C.C.; Hanson, R.T.; Martin, P.; Schmid, W.
2011-01-01
California's Central Valley has been one of the most productive agricultural regions in the world for more than 50 years. To better understand the groundwater availability in the valley, the U.S. Geological Survey (USGS) developed the Central Valley hydrologic model (CVHM). Because of recent water-level declines and renewed subsidence, the CVHM is being updated to better simulate the geohydrologic system. The CVHM updates and refinements can be grouped into two general categories: (1) model code changes and (2) data updates. The CVHM updates and refinements will require that the model be recalibrated. The updated CVHM will provide a detailed transient analysis of changes in groundwater availability and flow paths in relation to climatic variability, urbanization, stream flow, and changes in irrigated agricultural practices and crops. The updated CVHM is particularly focused on more accurately simulating the locations and magnitudes of land subsidence. The intent of the updated CVHM is to help scientists better understand the availability and sustainability of water resources and the interaction of groundwater levels with land subsidence. ?? 2011 ASCE.
Faunt, Claudia C.; Hanson, Randall T.; Martin, Peter; Schmid, Wolfgang
2011-01-01
California's Central Valley has been one of the most productive agricultural regions in the world for more than 50 years. To better understand the groundwater availability in the valley, the U.S. Geological Survey (USGS) developed the Central Valley hydrologic model (CVHM). Because of recent water-level declines and renewed subsidence, the CVHM is being updated to better simulate the geohydrologic system. The CVHM updates and refinements can be grouped into two general categories: (1) model code changes and (2) data updates. The CVHM updates and refinements will require that the model be recalibrated. The updated CVHM will provide a detailed transient analysis of changes in groundwater availability and flow paths in relation to climatic variability, urbanization, stream flow, and changes in irrigated agricultural practices and crops. The updated CVHM is particularly focused on more accurately simulating the locations and magnitudes of land subsidence. The intent of the updated CVHM is to help scientists better understand the availability and sustainability of water resources and the interaction of groundwater levels with land subsidence.
Radiation dose optimization in the decommissioning plan for Loviisa NPP
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holmberg, R.; Eurajoki, T.
1995-03-01
Finnish rules for nuclear power require a detailed decommissioning plan to be made and kept up to date already during plant operation. The main reasons for this {open_quotes}premature{close_quotes} plan, is, firstly, the need to demonstrate the feasibility of decommissioning, and, secondly, to make realistic cost estimates in order to fund money for this future operation. The decomissioning for Lovissa Nuclear Power Plant (NPP) (2{times}445 MW, PWR) was issued in 1987. It must be updated about every five years. One important aspect of the plant is an estimate of radiation doses to the decomissioning workers. The doses were recently re-estimated becausemore » of a need to decrease the total collective dose estimate in the original plan, 23 manSv. In the update, the dose was reduced by one-third. Part of the reduction was due to changes in the protection and procedures, in which ALARA considerations were taken into account, and partly because of re-estimation of the doses.« less
Forest management planning for timber production: a sequential approach
Krishna P. Rustagi
1978-01-01
Explicit forest management planning for timber production beyond the first few years at any time necessitates use of information which can best be described as suspect. The two-step approach outlined here concentrates on the planning strategy over the next few years without losing sight of the long-run productivity. Frequent updating of the long-range and short-range...
ERIC Educational Resources Information Center
Stautberg, Susan Schiffer
Intended for women who plan to combine a career with motherhood, this book is a planning document for the full-time working mother-to-be during the three trimesters of pregnancy and the first trimester of motherhood. Each section discusses physical and mental changes associated with motherhood and includes a calendar for appointments and events…
From Physical Activity Guidelines to a National Activity Plan
ERIC Educational Resources Information Center
Bornstein, Daniel B.; Pate, Russell R.
2014-01-01
The U.S. National Physical Activity Plan (NPAP) is a comprehensive strategic plan aimed at increasing physical activity levels in all segments of the American population. The purpose of this paper is to summarize the development of the NPAP, provide an update on the status of the NPAP, and comment on the future of the NPAP. The NPAP was released…
SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vienna, John D.; Todd, Terry A.; Peterson, Mary E.
2012-11-26
This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.
Environmental Response Policy « Coast Guard Maritime Commons
effect This post provides links to updated forms CG-2692 and CG-2692B, which have both been revised to in conjunction with Vessel Response Plans: The First Year In this post, the assistant commandant for post was updated April 10, 2018 to reflect that Inmarsat will begin the migration 1400 UTC May 9, 2018
ERIC Educational Resources Information Center
Oregon State System of Higher Education, Eugene.
The report provides an update on racial and ethnic distribution in student enrollment and faculty employment for 1995-96 within the Oregon state system of higher education. A Faculty Diversity Initiative is highlighted, focusing on campus efforts to implement plans to achieve greater faculty diversity with the use of supplemental funds. Of the…
MEMS Stirling Cooler Development Update
NASA Technical Reports Server (NTRS)
Moran, Matthew E.; Wesolek, Danielle
2003-01-01
This presentation provides an update on the effort to build and test a prototype unit of the patented MEMS Stirling cooler concept. A micro-scale regenerator has been fabricated by Polar Thermal Technologies and is currently being integrated into a Stirling cycle simulator at Johns Hopkins University Applied Physics Laboratory. A discussion of the analysis, design, assembly, and test plans for the prototype will be presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-10
... Plan Update. c. Subsistence Uses of Horns, Antlers, Bones and Plants EA Update. 13. New Business. 14... guarantee that we will be able to do so. Wrangell-St. Elias National Park SRC Meeting Date and Location: The... if all business is completed. For Further Information on the Gates of the Arctic National Park SRC...
Environmental development plan for transportation programs: FY80 update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saricks, C.L.; Singh, M.K.; Bernard, M.J. III
1980-09-01
This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmentalmore » concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.« less
A Bat Algorithm with Mutation for UCAV Path Planning
Wang, Gaige; Guo, Lihong; Duan, Hong; Liu, Luo; Wang, Heqi
2012-01-01
Path planning for uninhabited combat air vehicle (UCAV) is a complicated high dimension optimization problem, which mainly centralizes on optimizing the flight route considering the different kinds of constrains under complicated battle field environments. Original bat algorithm (BA) is used to solve the UCAV path planning problem. Furthermore, a new bat algorithm with mutation (BAM) is proposed to solve the UCAV path planning problem, and a modification is applied to mutate between bats during the process of the new solutions updating. Then, the UCAV can find the safe path by connecting the chosen nodes of the coordinates while avoiding the threat areas and costing minimum fuel. This new approach can accelerate the global convergence speed while preserving the strong robustness of the basic BA. The realization procedure for original BA and this improved metaheuristic approach BAM is also presented. To prove the performance of this proposed metaheuristic method, BAM is compared with BA and other population-based optimization methods, such as ACO, BBO, DE, ES, GA, PBIL, PSO, and SGA. The experiment shows that the proposed approach is more effective and feasible in UCAV path planning than the other models. PMID:23365518
Natural Resource Management Plan for Brookhaven National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
green, T.
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by themore » Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).« less
NASA Technical Reports Server (NTRS)
Textor, G. P.; Kelly, L. B.; Kelly, M.
1972-01-01
The Deep Space Tracking and Data System activities in support of the Mariner Mars 1971 project from the first trajectory correction maneuver on 4 June 1971 through cruise and orbit insertion on 14 November 1971 are presented. Changes and updates to the TDS requirements and to the plan and configuration plus detailed information on the TDS flight support performance evaluation and the preorbital testing and training are included. With the loss of Mariner 8 at launch, a few changes to the Mariner Mars 1971 requirements, plan, and configuration were necessitated. Mariner 9 is now assuming the former mission plan of Mariner 8, including the TV mapping cycles and a 12-hr orbital period. A second trajectory correction maneuver was not required because of the accuracy of the first maneuver. All testing and training for orbital operations were completed satisfactorily and on schedule. The orbit insertion was accomplished with excellent results.
75 FR 9250 - Notice of Public Meeting, BLM-Alaska Resource Advisory Council
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
... Land Management, on a variety of planning and management issues associated with public land management.... Manager reports. Stimulus projects update. Alaska Land Information System. National Landscape Conservation System anniversary. Resource management planning. Other topics of interest to the RAC. All meetings are...
Major Investment Study for a Small Urbanized Area Corridor: Cabarrus/South Rowan, North Carolina
DOT National Transportation Integrated Search
1998-09-16
In 1993 the Cabarrus-South Rowan Urban Area MPO began work on updating their : long-range transportation plan. As part of the development of the long range : transportation plan, it is necessary to fulfill the requirements of the : Intermodal Surface...
77 FR 35410 - Fogarty International Center 2013 Strategic Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-13
... needs. The Fogarty International Center supports basic, clinical and applied research and training for U...) is updating its strategic plan. To anticipate and set priorities for global health research and research training, FIC requests input from scientists, the general public, and interested parties. The goal...
78 FR 1586 - Unified Agenda of Federal Regulatory and Deregulatory Actions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-08
.... Additionally, this project would update shipboard marine pollution emergency plans for noxious liquid substance... regulations on vessels carrying oil, oil pollution prevention, oil transfer operations, and rules for marine... No. 318 Marine Transportation- 1625-AA12 Related Facility Response Plans for Hazardous Substances...
Microgravity combustion science: Progress, plans, and opportunities
NASA Technical Reports Server (NTRS)
1992-01-01
An earlier overview is updated which introduced the promise of microgravity combustion research and provided a brief survey of results and then current research participants, the available set of reduced gravity facilities, and plans for experimental capabilities in the space station era. Since that time, several research studies have been completed in drop towers and aircraft, and the first space based combustion experiments since Skylab have been conducted on the Shuttle. The microgravity environment enables a new range of experiments to be performed since buoyancy induced flows are nearly eliminated, normally obscured forces and flows may be isolated, gravitational settling or sedimentation is nearly eliminated, and larger time or length scales in experiments are feasible. In addition to new examinations of classical problems, (e.g., droplet burning), current areas of interest include soot formation and weak turbulence, as influenced by gravity.
[Evacuation plan of an intensive care unit: a new quality indicator?].
Sánchez-Palacios, M; Lorenzo Torrent, R; Santana-Cabrera, L; Martín García, J A; Campos, S G; Carrasco de Miguel, V
2010-04-01
The intensive care units must be prepared for a possible disaster, whether internal or external, in case it becomes necessary to evacuate the in-patients. They must have an Emergency and Self-protection Plan that includes the patient evacuation criteria and this must be known by all the personnel who work in the service. For that reason, the patients must be triaged, based on their attention priorities, according to their survival possibilities. Having an evacuation, known by all the personnel and updated by means of the performance of periodic drills, should be included as a quality indicator that must be met, since this would achieve better attention to the patient in case of a disaster situation requiring the evacuation of the ICU. Copyright 2009 Elsevier España, S.L. y SEMICYUC. All rights reserved.
Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2012-10-24
This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less
Career Opportunities in Texas: A Master Plan for Vocational and Technical Education (1989 Update).
ERIC Educational Resources Information Center
Texas State Board of Education, Austin.
In January 1987, a Master Plan for the delivery of vocational and technical education in Texas was adopted by the State Board of Education (SBOE). The master plan details goals and strategies to assist in the development of a skilled and educated work force in Texas as the state enters the 21st century. As part of their mandated annual review…
Symbiotic Navigation in Multi-Robot Systems with Remote Obstacle Knowledge Sharing
Ravankar, Abhijeet; Ravankar, Ankit A.; Kobayashi, Yukinori; Emaru, Takanori
2017-01-01
Large scale operational areas often require multiple service robots for coverage and task parallelism. In such scenarios, each robot keeps its individual map of the environment and serves specific areas of the map at different times. We propose a knowledge sharing mechanism for multiple robots in which one robot can inform other robots about the changes in map, like path blockage, or new static obstacles, encountered at specific areas of the map. This symbiotic information sharing allows the robots to update remote areas of the map without having to explicitly navigate those areas, and plan efficient paths. A node representation of paths is presented for seamless sharing of blocked path information. The transience of obstacles is modeled to track obstacles which might have been removed. A lazy information update scheme is presented in which only relevant information affecting the current task is updated for efficiency. The advantages of the proposed method for path planning are discussed against traditional method with experimental results in both simulation and real environments. PMID:28678193
2015-10-01
This consensus document is an update of combined antiretroviral therapy (cART) guidelines and recommendations for HIV-1 infected adult patients. To formulate these recommendations, a panel composed of members of the AIDS Study Group and the AIDS National Plan (GeSIDA/Plan Nacional sobre el Sida) reviewed the efficacy and safety advances in clinical trials, and cohort and pharmacokinetic studies published in medical journals (PubMed and Embase) or presented in medical scientific meetings. The strength of the recommendations, and the evidence that supports them, are based on modified criteria of the Infectious Diseases Society of America. In this update, cART is recommended for all patients infected by type 1 human immunodeficiency virus (HIV-1). The strength and level of the recommendation depends on the CD4+T-lymphocyte count, the presence of opportunistic diseases or comorbid conditions, age, and prevention of transmission of HIV. The objective of cART is to achieve an undetectable plasma viral load. Initial cART should always comprise a combination of 3 drugs, including 2 nucleoside reverse transcriptase inhibitors, and a third drug from a different family. Three out of the ten recommended regimes are regarded as preferential (all of them with an integrase inhibitor as the third drug), and the other seven (based on a non-nucleoside reverse transcriptase inhibitor, a ritonavir-boosted protease inhibitor, or an integrase inhibitor) as alternatives. This update presents the causes and criteria for switching cART in patients with undetectable plasma viral load, and in cases of virological failure where rescue cART should comprise 3 (or at least 2) drugs that are fully active against the virus. An update is also provided for the specific criteria for cART in special situations (acute infection, HIV-2 infection, and pregnancy) and with comorbid conditions (tuberculosis or other opportunistic infections, kidney disease, liver disease, and cancer). These new guidelines update previous recommendations related to cART (when to begin and what drugs should be used), how to monitor and what to do in case of viral failure or drug adverse reactions. cART specific criteria in comorbid patients and special situations are equally updated. Copyright © 2015 Elsevier España, S.L.U. y Sociedad Española de Enfermedades Infecciosas y Microbiología Clínica. All rights reserved.
Aziz, Mirette; Ahmed, Sabra; Ahmed, Boshra
2017-12-01
To assess the attitudes of physicians providing family planning services at the public sector in Egypt about recommending intrauterine device (IUD) for family planning clients, and to identify the factors that could affect their attitudes. A descriptive cross sectional study, in which all the physicians providing family planning services in Assiut Governorate were invited to complete self-administered questionnaires. The study participants were recruited at the family planning sector monthly meetings of the 13 health directorates of Assiut Governorate, Upper Egypt. 250 physicians accepted to participate in the study. Bivariate and Multivariate regression analyses were performed to identify the most important predictors of recommending IUD to family planning clients when appropriate. Less than 50% of physicians would recommend IUD for clients with proper eligibility criteria; women younger than 20 years old (49.2%), women with history of ectopic pregnancy (34%), history of pelvic inflammatory diseases (40%) or sexually transmitted diseases (18.4%) and nulliparous women (22.8%). Receiving family planning formal training within the year preceding data collection and working in urban areas were the significant predictors of recommending IUD insertion for appropriate clients. Physicians providing family planning services in Upper Egypt have negative attitudes about recommending IUD for family planning clients. Continuous education and in-service training about the updated medical eligibility criteria, especially for physicians working in rural areas may reduce the unfounded medical restrictions for IUD use. Copyright © 2017 Elsevier B.V. All rights reserved.
NASA Technical Reports Server (NTRS)
1985-01-01
The Lewis Strategic Plan was updated for 1985 and beyond. Major programs for the space station, the advanced turboprop, the Advanced Communications Technology Satellite (ACTS), and the Altitude Wind Tunnel were begun or greatly expanded during 1984. In parallel, The Lewis aeropropulsion research and technology program was extensively evaluated and reviewed; a reduced and reoriented program emerged. The thrusts and implementation plans for these programs are described as they pertain to the individual directorates. Other key accomplishments and plans are summarized.
Aircraft Mishap Exercise at SLF
2018-02-14
NASA Kennedy Space Center's Flight Operations prepares to rehearse a helicopter crash-landing to test new and updated emergency procedures. Called the Aircraft Mishap Preparedness and Contingency Plan, the operation was designed to validate several updated techniques the center's first responders would follow, should they ever need to rescue a crew in case of a real accident. The mishap exercise took place at the center's Shuttle Landing Facility.
Sonja N. Oswalt; W. Brad Smith; Patrick D. Miles; Scott A. Pugh
2014-01-01
Forest resource statistics from the 2010 Resources Planning Act (RPA) Assessment were updated to provide current information on the Nation's forests as a baseline for the 2015 national assessment. Resource tables present estimates of forest area, volume, mortality, growth, removals, and timber products output in various ways, such as by ownership, region, or State...
CSTT Update: Fuel Quality Analyzer
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brosha, Eric L.; Lujan, Roger W.; Mukundan, Rangachary
These are slides from a presentation. The following topics are covered: project background (scope and approach), developing the prototype (timeline), update on intellectual property, analyzer comparisons (improving humidification, stabilizing the baseline, applying clean-up strategy, impact of ionomer content and improving clean-up), proposed operating mode, considerations for testing in real-world conditions (Gen 1 analyzer electronics development, testing partner identified, field trial planning), summary, and future work.
ERIC Educational Resources Information Center
Balfanz, Robert; Bridgeland, John M.; Bruce, Mary; Fox, Joanna Hornig
2012-01-01
In 2010, the authors shared a Civic Marshall Plan to create a Grad Nation. Through that first report and subsequent update, they saw hopeful signs of progress in boosting high school graduation rates in communities across the country. This 2012 report shows that high school graduation rates continue to improve nationally and across many states and…
iTree-Hydro: Snow hydrology update for the urban forest hydrology model
Yang Yang; Theodore A. Endreny; David J. Nowak
2011-01-01
This article presents snow hydrology updates made to iTree-Hydro, previously called the Urban Forest EffectsâHydrology model. iTree-Hydro Version 1 was a warm climate model developed by the USDA Forest Service to provide a process-based planning tool with robust water quantity and quality predictions given data limitations common to most urban areas. Cold climate...
7 CFR 761.105 - Year-end analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... days after the end of the business year or farm budget planning period and must include: (1) An analysis comparing actual income, expenses, and production to projected income, expenses, and production for the preceding production cycle; and (2) An updated farm operating plan. [72 FR 63285, Nov. 8, 2007...
7 CFR 761.105 - Year-end analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... days after the end of the business year or farm budget planning period and must include: (1) An analysis comparing actual income, expenses, and production to projected income, expenses, and production for the preceding production cycle; and (2) An updated farm operating plan. [72 FR 63285, Nov. 8, 2007...
7 CFR 761.105 - Year-end analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the end of the business year or farm budget planning period and must include: (1) An analysis comparing actual income, expenses, and production to projected income, expenses, and production for the preceding production cycle; and (2) An updated farm operating plan. [72 FR 63285, Nov. 8, 2007, as amended...
7 CFR 761.105 - Year-end analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... days after the end of the business year or farm budget planning period and must include: (1) An analysis comparing actual income, expenses, and production to projected income, expenses, and production for the preceding production cycle; and (2) An updated farm operating plan. [72 FR 63285, Nov. 8, 2007...
Supplement no. 1 to the January 1974 report on active and planned spacecraft and experiments
NASA Technical Reports Server (NTRS)
Horowitz, R.; Davis, L. R.
1974-01-01
Updated information and descriptions on spacecraft and experiments are listed according to spacecraft name and principle experimental investigator. A cumulative index of active and planned spacecraft and experiments is provided; bar graph indexes for electromagnetic radiation experiments are included in table form.
77 FR 64117 - National Institute of Mental Health; Notice of Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-18
... Interagency Autism Coordinating Committee (IACC). The purpose of the 2012 IACC Strategic Planning Workshop is... research that have occurred since January 2011, when the IACC Strategic Plan for Autism Spectrum Disorder Research was previously updated. The group will also identify remaining gap areas in autism research...
75 FR 38113 - National Institute of Mental Health; Notice of Request for Information
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
...): Updating the Interagency Autism Coordinating Committee Strategic Plan for Autism Spectrum Disorder (ASD... Autism Coordinating Committee (IACC). The purpose of this RFI is to request input from ASD stakeholders... the Strategic Plan for ASD Research, Office of the Autism Research Coordination, National Institute of...
"Pride and Prejudice". [Lesson Plan].
ERIC Educational Resources Information Center
Soderquist, Alisa
Based on Jane Austen's novel "Pride and Prejudice," this lesson plan presents activities designed to help students understand that classics are those pieces of literature that continue to be popular long after they were written; classics tend to have universal themes; and Austen's writing has been updated and dramatized and, most likely, will…
36 CFR 219.30 - Plan documentation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... also contains maps, monitoring and evaluation results, the annual monitoring and evaluation report, and... annual monitoring and evaluation report; and (6) A summary of the projected program of work, updated... years; and a display of the budget trends over at least the past 5 years. (e) Other components. A plan...
NASA Technical Reports Server (NTRS)
Palguta, T.; Bradley, W.; Stockton, T.
1988-01-01
Guidance in preparing and updating an integrated logistics support plan (ILSP) is given. Clear, concise, and detailed instructions are provided on the preparation and content of an ILSP in order to ensure a quality document that reflects total program requirements.
78 FR 77444 - State Energy Advisory Board (STEAB)
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-23
... 2014 engagement plan between STEAB and EERE, review the five main focus areas for 2014 and report on progress made in those areas, provide an update to the Board on routine business matters, and begin planning and discussing the agenda and logistics for the upcoming March 2014 meeting. Public Participation...
42 CFR 51c.303 - Project elements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... accepted accounting principles, be considered income and expense items; (2) Provides for a capital... principles, be considered capital items; (3) Provides for plan review and updating at least annually; and (4... grant funds for the operation of a prepaid health care plan also must provide: (1) A marketing and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... change provisions of the 1982 planning rule. The Ecological Sustainability Report that was completed in... will be updated with any new available information. The Social and Economic Sustainability Report that... need for species diversity, ecosystem sustainability, and restoration of desired ecosystem...
Delivering Innovation: The Joint Concept Development and Experimentation Campaign Plan FY2004-2011
2004-01-26
Janushkowsky (STRATCOM), Maj Gen Stenner (SOUTHCOM), LTC Butts (TRANSCOM) Campaign Plan; J9 UpdateFace to Face Conference12 Feb 2003 COL (P) Verbeck (EUCOM... Stenner (SOUTHCOM), Ms. Young (TRANSCOM), MG Higgins (USFK), Dr. Hanley (OSD-OFT), RADM Gallagher (ACT) Combatant Commander Attendees IWS IWS VTC
Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawrence, B.
2001-04-30
The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.
40 CFR 52.1470 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Highway 50 Corridor Study, June 1979 (Appendix C); (D) Reference from Transportation and Traffic... submitted on May 5, 1983 by the State: (i) “Stateline, Nevada, 1983 Carbon Monoxide Study”—a traffic... Implementation Plan, Post 1982 Update for Ozone adopted on October 16, 1984 (including section 33 (Chlorine in...
40 CFR 52.1470 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Highway 50 Corridor Study, June 1979 (Appendix C); (D) Reference from Transportation and Traffic... submitted on May 5, 1983 by the State: (i) “Stateline, Nevada, 1983 Carbon Monoxide Study”—a traffic... Implementation Plan, Post 1982 Update for Ozone adopted on October 16, 1984 (including section 33 (Chlorine in...
The Collins Center Update. Volume 6, Issue 3, April-June 2004
2004-06-01
fought campaign plans with students from the other Senior Level Colleges in a free - play computer-assisted war game. INSIDE THIS ISSUE • Unified...phase, where the students came together to execute their plans in a dynamic free - play environment. The exercise, guided by the participants’ own
Planning the School Library Media Center Budget.
ERIC Educational Resources Information Center
Buckingham, Betty Jo; McCurdy, Susan
As a result of an Iowa state mandate for budgeting of school library media centers, the publication "Planning the School Library Media Center Budget" was updated in 1991. Since that time, the Uniform Financial Accounting's document has phased in a management information system which includes different numbers and dimensions from those…
An Update on Asset Management Plans in the United Kingdom.
ERIC Educational Resources Information Center
Patel, Mukund
1999-01-01
Describes a current project in the United Kingdom designed to improve school buildings. The use of Asset Management Plans (AMPs) in providing the means through which likely future needs are assessed, criteria for prioritization are set, and informed decisions on local spending are made are examined. (GR)
Formulation of consumables management models. Consumables flight planning worksheet utilization
NASA Technical Reports Server (NTRS)
Newman, C. M.
1977-01-01
The updated and reformatted consumables flight planning worksheet is documented. An instruction set for applying the worksheet, and a sample application of the worksheet is disclosed. The particular application is for the STS interfacing with sortie payloads and typifies the interfacing of the delivery system and payloads.
We update and reevaluate the scientific information on the distribution, history and causes of continental shelf hypoxia that supports the 2001 "Action Plan for Reducing, Mitigating, and Controlling Hypoxiain the Northern Gulf of Mexico," incorporating data, publications, and res...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-14
...: The park includes five remote islands spanning 2,228 square miles of land and sea. Updating the park's... General Management Plan/Wilderness Study/Environmental Impact Statement, Channel Islands National Park... (GMP)/Wilderness Study/Environmental Impact Statement (EIS) for Channel Islands National Park. The...
2015 Space Human Factors Engineering Standing Review Panel
NASA Technical Reports Server (NTRS)
Steinberg, Susan
2015-01-01
The 2015 Space Human Factors Engineering (SHFE) Standing Review Panel (from here on referred to as the SRP) met for a site visit in Houston, TX on December 2 - 3, 2015. The SRP reviewed the updated research plans for the Risk of Inadequate Design of Human and Automation/Robotic Integration (HARI Risk), the Risk of Inadequate Human-Computer Interaction (HCI Risk), and the Risk of Inadequate Mission, Process and Task Design (MPTask Risk). The SRP also received a status update on the Risk of Incompatible Vehicle/Habitat Design (Hab Risk) and the Risk of Performance Errors Due to Training Deficiencies (Train Risk). The SRP is pleased with the progress and responsiveness of the SHFE team. The presentations were much improved this year. The SRP is also pleased with the human-centered design approach. Below are some of the more extensive comments from the SRP. We have also made comments in each section concerning gaps/tasks in each. The comments below reflect more significant changes that impact more than just one particular section.
Avionics Tether Operations Control
NASA Technical Reports Server (NTRS)
Glaese, John R.
2001-01-01
The activities described in this Final Report were authorized and performed under Purchase Order Number H32835D, issued as part of NASA contract number NAS8-00114. The period of performance of this PO was from March 1 to September 30, 2001. The primary work activity was the continued development and updating of the tether dynamic simulation tools GTOSS (Generalized Tethered Object System Simulation) and TSSIM (Tethered Satellite System) and use of these and other tools in the analysis of various tether dynamics problems. Several updated versions of GTOSS were delivered during the period of performance by the author of the simulation, Lang Associates' David Lang. These updates had mainly to do with updated documentation and an updated coordinate system definition to the J2000 standards. This Final Report is organized by the months in which the activities described were performed. The following sections review the Statement of Work (SOW) and activities performed to satisfy it.
Threshold-driven optimization for reference-based auto-planning
NASA Astrophysics Data System (ADS)
Long, Troy; Chen, Mingli; Jiang, Steve; Lu, Weiguo
2018-02-01
We study threshold-driven optimization methodology for automatically generating a treatment plan that is motivated by a reference DVH for IMRT treatment planning. We present a framework for threshold-driven optimization for reference-based auto-planning (TORA). Commonly used voxel-based quadratic penalties have two components for penalizing under- and over-dosing of voxels: a reference dose threshold and associated penalty weight. Conventional manual- and auto-planning using such a function involves iteratively updating the preference weights while keeping the thresholds constant, an unintuitive and often inconsistent method for planning toward some reference DVH. However, driving a dose distribution by threshold values instead of preference weights can achieve similar plans with less computational effort. The proposed methodology spatially assigns reference DVH information to threshold values, and iteratively improves the quality of that assignment. The methodology effectively handles both sub-optimal and infeasible DVHs. TORA was applied to a prostate case and a liver case as a proof-of-concept. Reference DVHs were generated using a conventional voxel-based objective, then altered to be either infeasible or easy-to-achieve. TORA was able to closely recreate reference DVHs in 5-15 iterations of solving a simple convex sub-problem. TORA has the potential to be effective for auto-planning based on reference DVHs. As dose prediction and knowledge-based planning becomes more prevalent in the clinical setting, incorporating such data into the treatment planning model in a clear, efficient way will be crucial for automated planning. A threshold-focused objective tuning should be explored over conventional methods of updating preference weights for DVH-guided treatment planning.
Primary and community care workforce planning and development.
Hurst, Keith
2006-09-01
This article reports a study that provided primary and community care managers with information, allowing them to: (a) evaluate the size and mix of their workforce; and (b) develop knowledgeable and skilled teams to meet the demands of growing and changing services. Primary and community care services are growing in the United Kingdom, but workforce planning and development, despite their wide-ranging cost and quality implications, have not received the same attention. Indeed, most primary and community care workforce planning and development issues are universal. Demand 1-1 side workforce planning is concerned not only with the number, but also with staff mix; but how these autonomous and isolated practitioners spend their time is unique. The other side of the equation, workforce supply, raises many recruitment and retention challenges for managers in many countries. Any country's main workforce planning methods apply equally well to primary care, but each is flawed. A second, main problem is that the methods lead to fragmented services, whereas modern workforce planning methods should be multidisciplinary. Consequently, it has never been more important for managers to have data and algorithms to develop appropriate care teams. A large and versatile workforce database, profiling 304 English primary care trusts using demographic, socio-economic, mortality, morbidity, staffing and performance workforce-related variables, compiled in 2002 and updated yearly, is described. Data were supplemented with a systematic literature review leading to a 340-item annotated bibliography; and qualitative interviews with managers. Workforce size and mix are historical and irrational at best. Moreover, the number of variables that influence staffing is growing, thereby complicating workforce planning. Evaluating and adjusting the size and mix of teams using empirically determined community demand and performance variables based on the area's socio-economic characteristics is feasible.
Bohm, Tim D; DeLuca, Paul M; DeWerd, Larry A
2003-04-01
Permanent implantation of low energy (20-40 keV) photon emitting radioactive seeds to treat prostate cancer is an important treatment option for patients. In order to produce accurate implant brachytherapy treatment plans, the dosimetry of a single source must be well characterized. Monte Carlo based transport calculations can be used for source characterization, but must have up to date cross section libraries to produce accurate dosimetry results. This work benchmarks the MCNP code and its photon cross section library for low energy photon brachytherapy applications. In particular, we calculate the emitted photon spectrum, air kerma, depth dose in water, and radial dose function for both 125I and 103Pd based seeds and compare to other published results. Our results show that MCNP's cross section library differs from recent data primarily in the photoelectric cross section for low energies and low atomic number materials. In water, differences as large as 10% in the photoelectric cross section and 6% in the total cross section occur at 125I and 103Pd photon energies. This leads to differences in the dose rate constant of 3% and 5%, and differences as large as 18% and 20% in the radial dose function for the 125I and 103Pd based seeds, respectively. Using a partially updated photon library, calculations of the dose rate constant and radial dose function agree with other published results. Further, the use of the updated photon library allows us to verify air kerma and depth dose in water calculations performed using MCNP's perturbation feature to simulate updated cross sections. We conclude that in order to most effectively use MCNP for low energy photon brachytherapy applications, we must update its cross section library. Following this update, the MCNP code system will be a very effective tool for low energy photon brachytherapy dosimetry applications.
Using principles from emergency management to improve emergency response plans for research animals.
Vogelweid, Catherine M
2013-10-01
Animal research regulatory agencies have issued updated requirements for emergency response planning by regulated research institutions. A thorough emergency response plan is an essential component of an institution's animal care and use program, but developing an effective plan can be a daunting task. The author provides basic information drawn from the field of emergency management about best practices for developing emergency response plans. Planners should use the basic principles of emergency management to develop a common-sense approach to managing emergencies in their facilities.
Keep Driving -- An Assessment of the Afghan Development Program
2011-03-30
These questions have raised the level of inquiry the Afghan mission and spurred research to determine if the U.S. has an adequate plan to defeat...stories/afghanistan/ba_afg_road.html. 4 NATO OTAN 9 Kandahar: Plan Overview UNCLASSIFIED • Manage relationships: Powerbrokers and Political elite...development Strategy (ANDS).7 These planning efforts led to an updated National Development Strategy for 2010-2013 published by GIRoA after
Data update in a land information network
NASA Astrophysics Data System (ADS)
Mullin, Robin C.
1988-01-01
The on-going update of data exchanged in a land information network is examined. In the past, major developments have been undertaken to enable the exchange of data between land information systems. A model of a land information network and the data update process have been developed. Based on these, a functional description of the database and software to perform data updating is presented. A prototype of the data update process was implemented using the ARC/INFO geographic information system. This was used to test four approaches to data updating, i.e., bulk, block, incremental, and alert updates. A bulk update is performed by replacing a complete file with an updated file. A block update requires that the data set be partitioned into blocks. When an update occurs, only the blocks which are affected need to be transferred. An incremental update approach records each feature which is added or deleted and transmits only the features needed to update the copy of the file. An alert is a marker indicating that an update has occurred. It can be placed in a file to warn a user that if he is active in an area containing markers, updated data is available. The four approaches have been tested using a cadastral data set.
DebriSat Project Update and Planning
NASA Technical Reports Server (NTRS)
Sorge, M.; Krisko, P. H.
2016-01-01
DebriSat Reporting Topics: DebriSat Fragment Analysis Calendar; Near-term Fragment Extraction Strategy; Fragment Characterization and Database; HVI (High-Velocity Impact) Considerations; Requirements Document.
Large scale Wyoming transportation data: a resource planning tool
O'Donnell, Michael S.; Fancher, Tammy S.; Freeman, Aaron T.; Ziegler, Abra E.; Bowen, Zachary H.; Aldridge, Cameron L.
2014-01-01
The U.S. Geological Survey Fort Collins Science Center created statewide roads data for the Bureau of Land Management Wyoming State Office using 2009 aerial photography from the National Agriculture Imagery Program. The updated roads data resolves known concerns of omission, commission, and inconsistent representation of map scale, attribution, and ground reference dates which were present in the original source data. To ensure a systematic and repeatable approach of capturing roads on the landscape using on-screen digitizing from true color National Agriculture Imagery Program imagery, we developed a photogrammetry key and quality assurance/quality control protocols. Therefore, the updated statewide roads data will support the Bureau of Land Management’s resource management requirements with a standardized map product representing 2009 ground conditions. The updated Geographic Information System roads data set product, represented at 1:4,000 and +/- 10 meters spatial accuracy, contains 425,275 kilometers within eight attribute classes. The quality control of these products indicated a 97.7 percent accuracy of aspatial information and 98.0 percent accuracy of spatial locations. Approximately 48 percent of the updated roads data was corrected for spatial errors of greater than 1 meter relative to the pre-existing road data. Twenty-six percent of the updated roads involved correcting spatial errors of greater than 5 meters and 17 percent of the updated roads involved correcting spatial errors of greater than 9 meters. The Bureau of Land Management, other land managers, and researchers can use these new statewide roads data set products to support important studies and management decisions regarding land use changes, transportation and planning needs, transportation safety, wildlife applications, and other studies.
Curtis H. Flather; Michael S. Knowles; Jason McNees
2008-01-01
This technical document supports the Forest Service's requirement to assess the status of renewable natural resources as mandated by the Forest and Rangeland Renewable Resources Planning Act of 1974. It updates past reports on the trends and geographic patterns of species formally listed as threatened or endangered under the Endangered Species Act of 1973. We...
Consuelo Brandeis; Donald G. Hodges
2015-01-01
The analysis in this article provides an update on the southern forest sector economic activity after the downturn experienced in 2008â2009. The analysis was conducted using Impact Analysis for Planning (IMPLAN) software and data sets for 2009 and 2011 and results from the USDA Forest Service Timber Products Output latest survey of primary wood processing mills....
Aircraft Mishap Exercise at SLF
2018-02-14
Members of NASA Kennedy Space Center's Flight Operations team participate in a rehearsal of a helicopter crash-landing to test new and updated emergency procedures. Called the Aircraft Mishap Preparedness and Contingency Plan, the operation was designed to validate several updated techniques the center's first responders would follow, should they ever need to rescue a crew in case of a real accident. The mishap exercise took place at the center's Shuttle Landing Facility.
Aircraft Mishap Exercise at SLF
2018-02-14
NASA Kennedy Space Center's Flight Operations team reviews procedures before beginning a rehearsal of a helicopter crash-landing to test new and updated emergency procedures. Called the Aircraft Mishap Preparedness and Contingency Plan, the operation was designed to validate several updated techniques the center's first responders would follow, should they ever need to rescue a crew in case of a real accident. The mishap exercise took place at the center's Shuttle Landing Facility.
Aircraft Mishap Exercise at SLF
2018-02-14
Members of NASA Kennedy Space Center's Flight Operations team prepare for a rehearsal of a helicopter crash-landing to test new and updated emergency procedures. Called the Aircraft Mishap Preparedness and Contingency Plan, the operation was designed to validate several updated techniques the center's first responders would follow, should they ever need to rescue a crew in case of a real accident. The mishap exercise took place at the center's Shuttle Landing Facility.
Aircraft Mishap Exercise at SLF
2018-02-14
A member of NASA Kennedy Space Center's Flight Operations team prepares for a rehearsal of a helicopter crash-landing to test new and updated emergency procedures. Called the Aircraft Mishap Preparedness and Contingency Plan, the operation was designed to validate several updated techniques the center's first responders would follow, should they ever need to rescue a crew in case of a real accident. The mishap exercise took place at the center's Shuttle Landing Facility.
NASA Technical Reports Server (NTRS)
1994-01-01
This Interface Control Document (ICD) defines the specific details of the complete accomodation information between the Earth Observing System (EOS) PM Spacecraft and the Advanced Microwave Sounding Unit (AMSU-A)Instrument. This is the first submittal of the ICN: it will be updated periodically throughout the life of the program. The next update is planned prior to Critical Design Review (CDR).
Airliner Cabin Ozone: An Updated Review
1989-12-01
authorized Airliner Cabin Ozone: An Updated Review INTRODUCTION Prior to 1980 , there was a great deal of concern about the adverse effects of ozone on the...and by flight planning to avoid known areas of high atmospheric ozone concentration. Since the final rule was published in 1980 , few reports have...pointed out in 1980 (4), that ozone concentration is the predominant factor in determining the effective dose. These latter studies indicate that
Working Memory Updating as a Predictor of Academic Attainment
ERIC Educational Resources Information Center
Lechuga, M. Teresa; Pelegrina, Santiago; Pelaez, Jose L.; Martin-Puga, M. Eva; Justicia, M. Jose
2016-01-01
There is growing evidence supporting the importance of executive functions, and specifically working memory updating (WMU), for children's academic achievement. This study aimed to assess the specific contribution of updating to the prediction of academic performance. Two updating tasks, which included different updating components, were…
Riggs, Richard V; Roberts, Pamela S; DiVita, Margaret A; Niewczyk, Paulette; Granger, Carl V
2014-01-01
To compare and contrast subjective perceptions with objective compliance of the impact of the 2010 Centers for Medicare and Medicaid Service updates of the Medicare Benefit Policy Manual. Cross-sectional survey. An electronic survey was sent by the Uniform Data System for Medical Rehabilitation to all enrolled inpatient rehabilitation facility subscribers (n = 817). The survey was sent April 15, 2011, and responses were tabulated if they were received by May 15, 2011. Comparing and contrasting of the subjective perception to objective evaluation and/or compliance with the Medicare Benefit Policy Manual on case mix index, length of stay, admissions by diagnostic category as well as perception of preadmission screening, postadmission evaluation, plan of care, and interdisciplinary conferencing. Twenty-five percent of the 817 facilities responded, for a total of 209 responses. Complete data were present in 148 of the respondents. For most diagnostic categories, perception of change did not mirror reality of change; neither did the perception between change in case mix index and length of stay. Perception did match reality in stroke and multiple trauma cases; respondents perceived an increase in admissions for the 2 impairments, and there was an overall increase in reality. Comparison with actual data identified that gaps exist between diagnostic category perceptions and actual diagnostic category admission performance. Regulations such as the 75%-60% rule and audit focus on non-neurologic conditions as well as actual inpatient rehabilitation facility program payment reports may have influenced respondents perceptions to change associated with the Medicare Benefit Policy Manual modifications. This disparity between perception and actual data may have implications for programmatic planning, forecasting, and resource allocation. Copyright © 2014 American Academy of Physical Medicine and Rehabilitation. Published by Elsevier Inc. All rights reserved.
ERIC Educational Resources Information Center
US Department of Education, 2007
2007-01-01
"Helpful Hints" offers a quick overview of school emergency preparedness topics that are frequently the subject of inquiries. Developing and implementing comprehensive, multi-hazard emergency management plans is an ongoing process that must be consistently reinforced and strengthened. Opportunities for reviewing, strengthening and updating…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... Management Planning Highlands Center Update Alternate Transportation funding Ocean stewardship topics--shoreline change Pilgrim Power Station and Disaster Response Planning Herring Cove Beach/revetment Review of seashore houses, leasing, and demolition Climate Friendly Parks 6. Old Business 7. New Business 8. Date and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... for incorporating by reference Federally- approved SIPs, as a result of consultations between EPA and... and ``Identification of plan'' format are discussed in further detail in the May 22, 1997 Federal... ``good cause'' exemption in section 553(b)(3)(B) of the Administrative Procedures Act (APA) which, upon...
Planning for a Better Future: California 2025. 2011 Update
ERIC Educational Resources Information Center
Public Policy Institute of California, 2011
2011-01-01
California's current economic and fiscal realities make nonpartisan, objective information on the state's future challenges all the more critical. Understandably, the search is on for immediate solutions to the unprecedented crises people face today. But if the present crises make policymakers shelve long-term planning, the result may be an even…
National Strategic Research Plan for Hearing and Hearing Impairment and Voice and Voice Disorders.
ERIC Educational Resources Information Center
National Inst. on Deafness and Other Communications Disorders, Bethesda, MD.
This monograph presents an update to the strategic plan of the National Institute on Deafness and Other Communication Disorders (NIDCD), focusing on recent accomplishments, program goals, strategies, and priorities in research opportunities in the areas of hearing/hearing impairment and voice/voice disorders. Specifically considered for the…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... review. The EIS was updated to address the comments received on the 2010 Draft EIS. We are considering... burrowing owl (Athene cunicularia hypugaea), tricolored blackbird (Agelaius tricolor), Mount Hamilton... received on the Draft EIR/ EIS and our responses to those comments. Following a 30-day review period, we...
NASA Technical Reports Server (NTRS)
Bottenberg, W. R.
1981-01-01
The updated program plan and narrative reflects the design and development work done and progress made in establishing a viable design for these modules. Design alterations from the preproduction plan are discussed based on experience gained during the preproduction phase of the program.
This presentation provides an overview and status update of the Federal Research Action Plan (FRAP) on Recycled Tire Crumb Used on Playing Fields and Playgrounds. The presentation includes information on Federal research activities, stakeholder engagement, other studies, and the ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-03
... direct final rule in the Federal Register informing the public that the rule will not take effect... maintenance period, a commitment to maintain the existing monitoring network, factors and procedures to be... Network Indiana currently operates two SO 2 monitors in Lake County, Indiana. Indiana has committed to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-18
... Approval and Disapproval of Air Quality Implementation Plans; Nevada; Clark County; Stationary Source... limited approval and limited disapproval of revisions to the Clark County portion of the applicable state... limited approval and limited disapproval action is to update the applicable SIP with current Clark County...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-23
... Plan (SIP) revision submitted by the Washington Department of Ecology (Ecology) dated November 28, 2012... Air Quality Standard (NAAQS). Second, EPA is proposing to approve updated rules submitted by Ecology... emissions. II. Summary of SIP Revision Ecology's November 28, 2012 SIP revision contains two elements for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-31
... Department of Ecology (Ecology) dated November 20, 2013. This SIP revision updates ambient air quality... May 22, 1996. See 75 FR 35520 and 61 FR 25580. Lastly, Ecology requested EPA approval of the state..., particulate matter, and sulfur dioxide. Secondly, Ecology repealed Chapter 173-470 WAC that contained outdated...
DOT National Transportation Integrated Search
2001-01-01
As we enter the 21st century, the nations transportation system is at a crossroads. After : building highway and aviation networks that are the envy of the world, increasing gridlock threatens to undermine the success of those investments and the ...
DOT National Transportation Integrated Search
2011-01-01
This report provides a summary of a peer exchange sponsored by the Vermont Agency of Transportation (VTrans). The peer exchange convened Vermonts Strategic Highway Safety Plan (SHSP) Core Group to discuss the strengths and weaknesses of Vermont...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... update the Georgia SIP to reflect EPA's current national ambient air quality standards (NAAQS) for sulfur...'s rules identifying the current NAAQS table for sulfur dioxide, nitrogen dioxide, ozone, lead and... separate action. II. Analysis of the State's Submittal a. Sulfur Dioxide On June 22, 2010, EPA revised the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-22
..., Parks and Tourism. Level of Service staffing at the GPNC would remain the same. Alternative B--Proposed... the constraints imposed by biological, economic, social, political, and legal considerations... meetings are yet to be determined, but will be announced via local media and a planning update. Next Steps...
DOT National Transportation Integrated Search
1997-01-01
Congress recently requested the Intelligent Transportation Systems (ITS) Joint Program Office and the National Highway Traffic Safety Administration to update the 1992 ITS plan to deal with the fiscal year 1997 through fiscal year 2002 period, and...
Sacred Heart University's Online Emergency Plan Boosts Interagency Cooperation
ERIC Educational Resources Information Center
Healy, Paul J.
2010-01-01
Taking its responsibility to students, faculty, and staff seriously, Sacred Heart University wanted a highly effective emergency response plan, one that could be updated at any time, with information always available to first responders and other authorized users. For this lifesaving function, the university built a Web site based on Microsoft[R]…
Welch, Shari J; Stone-Griffith, Suzanne; Asplin, Brent; Davidson, Steven J; Augustine, James; Schuur, Jeremiah D
2011-05-01
The public, payers, hospitals, and Centers for Medicare and Medicaid Services (CMS) are demanding that emergency departments (EDs) measure and improve performance, but this cannot be done unless we define the terms used in ED operations. On February 24, 2010, 32 stakeholders from 13 professional organizations met in Salt Lake City, Utah, to standardize ED operations metrics and definitions, which are presented in this consensus paper. Emergency medicine (EM) experts attending the Second Performance Measures and Benchmarking Summit reviewed, expanded, and updated key definitions for ED operations. Prior to the meeting, participants were provided with the definitions created at the first summit in 2006 and relevant documents from other organizations and asked to identify gaps and limitations in the original work. Those responses were used to devise a plan to revise and update the definitions. At the summit, attendees discussed and debated key terminology, and workgroups were created to draft a more comprehensive document. These results have been crafted into two reference documents, one for metrics and the operations dictionary presented here. The ED Operations Dictionary defines ED spaces, processes, patient populations, and new ED roles. Common definitions of key terms will improve the ability to compare ED operations research and practice and provide a common language for frontline practitioners, managers, and researchers. © 2011 by the Society for Academic Emergency Medicine.
Kennedy Space Center Director Update
2014-03-06
CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. Attendees mingled and visited various displays, including Ground Systems Development and Operations Program and Education Office displays. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper
Kennedy Space Center Director Update
2014-03-06
CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. An attendee talks with engineers Jason Hopkins and Lisa Lutz, at the Ground Systems Development and Operations display. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper
Kennedy Space Center Director Update
2014-03-06
CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. Rob Mueller, senior technologist, talks with attendees at the Swamp Works display. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper
Kennedy Space Center Director Update
2014-03-06
CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. An attendee talks with Scott Thurston, Kennedy deputy of the spacecraft office at the Commercial Crew Program display. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper
Kennedy Space Center Director Update
2014-03-06
CAPE CANAVERAL, Fla. - Community leaders, business executives, educators, and state and local government leaders were updated on NASA Kennedy Space Center programs and accomplishments during Center Director Bob Cabana’s Center Director Update at the Debus Center at the Kennedy Space Center Visitor Complex in Florida. Rob Mueller, a senior technologist, talks to an attendee about Kennedy’s Swamp Works Laboratory. Attendees talked with Cabana and other senior Kennedy managers and visited displays featuring updates on Kennedy programs and projects, including International Space Station, Commercial Crew, Ground System Development and Operations, Launch Services, Center Planning and Development, Technology, KSC Swamp Works and NASA Education. The morning concluded with a tour of the new Space Shuttle Atlantis exhibit at the visitor complex. For more information, visit http://www.nasa.gov/kennedy. Photo credit: NASA/Daniel Casper
75 FR 62501 - Senior Executive Service Performance Review Board: Update
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
... AGENCY FOR INTERNATIONAL DEVELOPMENT Senior Executive Service Performance Review Board: Update... Development, Office of Inspector General's Senior Executive Service Performance Review Board. DATES: September... reference-- USAID OIG Senior Executive Service (SES) Performance Review Board). SUPPLEMENTARY INFORMATION: 5...
Differential verbal, visual, and spatial working memory in written language production.
Raulerson, Bascom A; Donovan, Michael J; Whiteford, Alison P; Kellogg, Ronald T
2010-02-01
The contributions of verbal, visual, and spatial working memory to written language production were investigated. Participants composed definitions for nouns while concurrently performing a task which required updating, storing, and retrieving information coded either verbally, visually, or spatially. The present study extended past findings by showing the linguistic encoding of planned conceptual content makes its largest demand on verbal working memory for both low and high frequency nouns. Kellogg, Olive, and Piolat in 2007 found that concrete nouns place substantial demands on visual working memory when imaging the nouns' referents during planning, whereas abstract nouns make no demand. The current study further showed that this pattern was not an artifact of visual working memory being sensitive to manipulation of just any lexical property of the noun prompts. In contrast to past results, writing made a small but detectible demand on spatial working memory.