Sample records for pilot plant program

  1. Pilot Plants Enhance Brazosport Lab Courses.

    ERIC Educational Resources Information Center

    Krieger, James

    1986-01-01

    Describes an experiential lab program for a two-year college's chemical technology program. Discusses student experiences in six miniature pilot plants that represent the essential instrumentation and chemical processes found in the chemical industry. Recognizes the industries that helped implement the program. (TW)

  2. Impact of a daily 10-minute strength and flexibility program in a manufacturing plant.

    PubMed

    Pronk, S J; Pronk, N P; Sisco, A; Ingalls, D S; Ochoa, C

    1995-01-01

    In summary, employees' flexibility and mood showed modest improvements following the implementation of a plant-wide, 10-minute, daily flexibility and strength program. The initial six-week pilot study, administered prior to the plant-wide program implementation, successfully assessed program feasibility, assessed the efficiency of program implementation, identified administrative and logistical concerns, and generated pilot data needed to secure managerial support. Despite the noted significant increases in grip strength in the pilot study, no increases were observed following the six months of plant-wide implementation. This may be related to the differences in low average pretest grip strength for the pilot study compared to the higher scores for the main study population. The pilot study subjects may have received a sufficient exercise stimulus to increase grip strength over the course of six weeks. In contrast, this may not have been the case for the main study subjects due to their higher initial mean grip strength. An increased number of exercises designed to directly impact grip strength may be needed to improve this parameter.

  3. Evaluation of the U.S. Environmental Protection Agency's Public Outreach Program during the Certification Process at the Waste Isolation Pilot Plant in New Mexico

    EPA Pesticide Factsheets

    The EPA Office of Radiation and Indoor Air (ORIA) contracted with Phoenix Environmental and EnviroIssues to evaluate the effectiveness of its public outreach program during its certification of the Waste Isolation Pilot Plant (WIPP) in Carlsbad, NM.

  4. Waste Isolation Pilot Plant No-migration variance petition. Addendum: Volume 7, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-03-01

    This report describes various aspects of the Waste Isolation Pilot Plant (WIPP) including design data, waste characterization, dissolution features, ground water hydrology, natural resources, monitoring, general geology, and the gas generation/test program.

  5. EVALUATION OF FGD DRY INJECTION SORBENTS AND ADDITIVES - VOLUME 2 - PILOT PLANT EVALUATION OF HIGH REACTIVITY SORBENTS

    EPA Science Inventory

    The report describes a mini-pilot test program to investigate potential new sorbents and processes for dry SO2 removal. Initial tests showed that the 85 cu m/h pilot plant could be used successfully to evaluate both spray dryer and dry injection processes using traditional calciu...

  6. Resource Conservation and Recovery Act, Part B permit application [of the Waste Isolation Pilot Plant (WIPP)]. Volume 11, Chapter D, Appendix D4--Chapter D, Appendix D17: Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    This volume contains appendices D4 through D17 which cover the following: Waste Isolation Pilot Plant site environmental report; ecological monitoring program at the Waste Isolation Pilot Plant; site characterization; regional and site geology and hydrology; general geology; dissolution features; ground water hydrology; typical carbon sorption bed efficiency; VOC monitoring plan for bin-room tests; chemical compatibility analysis of waste forms and container materials; probable maximum precipitation; WHIP supplementary roof support system room 1, panel 1; and corrosion risk assessment of the Waste Isolation Pilot Plant ``humid`` test bins.

  7. Refining and end use study of coal liquids II - linear programming analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lowe, C.; Tam, S.

    1995-12-31

    A DOE-funded study is underway to determine the optimum refinery processing schemes for producing transportation fuels that will meet CAAA regulations from direct and indirect coal liquids. The study consists of three major parts: pilot plant testing of critical upgrading processes, linear programming analysis of different processing schemes, and engine emission testing of final products. Currently, fractions of a direct coal liquid produced form bituminous coal are being tested in sequence of pilot plant upgrading processes. This work is discussed in a separate paper. The linear programming model, which is the subject of this paper, has been completed for themore » petroleum refinery and is being modified to handle coal liquids based on the pilot plant test results. Preliminary coal liquid evaluation studies indicate that, if a refinery expansion scenario is adopted, then the marginal value of the coal liquid (over the base petroleum crude) is $3-4/bbl.« less

  8. Argonne National Laboratory's Recycling Pilot Plant

    ScienceCinema

    Spangenberger, Jeff; Jody, Sam

    2018-05-30

    Argonne has a Recycling Pilot Plant designed to save the non-metal portions of junked cars. Here, program managers demonstrate how plastic shredder residue can be recycled. (Currently these automotive leftovers are sent to landfills. For more information, visit Argonne's Transportation Technology R&D Center Web site at http://www.transportation.anl.gov.

  9. BIMOMASS GASIFICATION PILOT PLANT STUDY

    EPA Science Inventory

    The report gives results of a gasification pilot program using two biomass feedstocks: bagasse pellets and wood chips. he object of the program was to determine the properties of biomass product gas and its suitability as a fuel for gas-turbine-based power generation cycles. he f...

  10. Control of odor and VOC emissions at wastewater treatment plants: Boston Harbor case study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Getter, R.; Breen, C.; Laquidara, M.

    1994-12-31

    Siting of the new wastewater treatment plant (WWTP) for the Massachusetts Water Resources Authority (MWRA) in Boston was based on an assumption of mitigation of total reduced sulfur (TRS) and volatile organic compound (VOC) emissions. Collection and treatment of exhaust streams from potential emission sources was recommended. Best Available Control Technology (BACT) for VOC control was conservatively suggested to consist of wet by carbon adsorption based on initial sampling performed in 1988 during facilities planning, which estimated uncontrolled VOC emissions in excess of 1,000 tons per year. This concept was carried forward to the design phase in 1990, concurrent withmore » an extensive air emissions testing and pilot treatment program at the NMRA`s existing primary treatment plant. Results of the pilot program, however, indicated source VOC concentrations well below what was expected as a result of the initial sampling study. Use of the 1990 pilot data in a top-down BACT analysis led to a recommendation to reconsider VOC control with carbon adsorption on the basis of prohibitive cost. This paper summarizes the background and permitting approach for five new odor control facilities on Deer Island for the Boston Harbor Project, with emphasis on the new primary treatment facilities. The paper also presents results from the 1990 emissions characterization and pilot program, providing generally applicable ideas for solving the difficulties of characterizing and estimating emissions for WWTPS. Results from operation of the pilot facilities illustrate the effectiveness of met scrubbing and carbon adsorption in removing TRS and VOCs from wastewater treatment exhaust air streams. In addition, pilot program results indicate the importance of flexibility in design of odor control systems to accommodate variations in concentrations of TRS and VOCS.« less

  11. Installation Restoration Program Records Search for Bergstrom Air Force Base, Texas.

    DTIC Science & Technology

    1983-07-01

    August 1981. "Pilot Plant Study of Copper , Zinc, and Trivalent Chromium Removal by Adsorbing Colloid Foam Flotation ." M.S. Thesis, Vanderbilt...graduate school and one of his activities included researching the removal of heavy metals, including copper , zinc and trivalent chromium, using a large...scale adsorbing colloid foam flotation pilot plant. Professional Registration Engineer-In-Training, Florida % -7. GREGORY T. MCINTYRE Membership in

  12. The 10 MWe solar thermal central receiver pilot plant solar facilities design integration, RADL item 1-10

    NASA Astrophysics Data System (ADS)

    1980-07-01

    Accomplishments are reported in the areas of: program management, system integration, the beam characterization system, receiver unit, thermal storage subsystems, master control system, plant support subsystem and engineering services. A solar facilities design integration program action items update is included. Work plan changes and cost underruns are discussed briefly. (LEW)

  13. PILOT PLANT STUDY OF CONVERSION OF COAL TO LOW SULFUR FUEL

    EPA Science Inventory

    The report gives results of a program to develop, on bench and pilot scales, operating conditions for the key step in the IGT process to desulfurize coal by thermal and chemical treatment. This process, to date, uses the 'sulfur-getter' concept. (A sulfur-getter is a material tha...

  14. Investigations into Improving Dewaterability at a Bio-P/Anaerobic Digestion Plant.

    PubMed

    Alm, Rebecca; Sealock, Adam W; Nollet, Yabing; Sprouse, George

    2016-11-01

      Metropolitan Council Environmental Services has observed poorer than expected dewatering performance at its Empire Plant. This plant has both anaerobic digestion and enhanced biological phosphorus removal in its treatment train. A research program using pilot-scale anaerobic digesters investigated potential solutions to the plant's poor dewaterability. The dewaterability goal was to increase the cake solids from 12% total solids (TS) to 16% TS or higher. This research investigated 20 different reactor conditions including chemical, feed sludge, and digested sludge treatments. At the pilot scale, unaerated storage of waste activated sludge prior to thickening and addition of ferric chloride to digestion was found to achieve dewatered cake solids of nearly 17% TS with the added benefit of reducing polymer demand. Issues including the amount of chemical required and the resulting volatile solids destruction influence the viability of the process change, so a full-scale pilot and financial analysis is recommended before making permanent process changes.

  15. Cocurrent scrubber evaluation TVA's Colbert Lime--Limestone Wet-Scrubbing Pilot Plant. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robards, R.F.; Moore, N.D.; Kelso, T.M.

    1979-01-01

    The Tennessee Valley Authority (TVA) is actively engaged in a pilot plant program to develop and/or evaluate wet-scrubbing processes for removing sulfur dioxide (SO/sub 2/) from boiler flue gas. The physical size and general arrangement of flue gas scrubbing systems have a major impact on capital investment and operating cost, as do potential operating and maintenance advantages inherent to some systems. The equipment configuration for a cocurrent scrubber reflects some of these advantages. EPRI funded TVA to perform preliminary screening tests of TVA's 1 MW pilot plant (Colbert Steam Plant) to develop operating data on the cocurrent design for usemore » in designing and operating a 10 MW prototype cocurrent scrubber at TVA's Shawnee Scrubber Test Facility. Results of the Colbert tests showed excellent sulfur dioxide removal efficiencies, generally greater than 85%, low pressure drop, and high particulate removal efficiencies. This report covers these screening tests.« less

  16. Photovoltaic pilot projects in the European community

    NASA Astrophysics Data System (ADS)

    Treble, F. C.; Grassi, G.; Schnell, W.

    The paper presents proposals received for the construction of photovoltaic pilot plants as part of the Commission of the European Communities' second 4-year solar energy R and D program. The proposed plants range from 30 to 300 kWp and cover a variety of applications including rural electrification, water pumping, desalination, dairy farming, factories, hospitals, schools and vacation centers. Fifteen projects will be accepted with a total generating capacity of 1 MWp, with preference given to those projects involving the development of new techniques, components and systems.

  17. Frederick National Lab Rallies to Meet Demand for Zika Vaccine | FNLCR Staging

    Cancer.gov

    The Frederick National Laboratory for Cancer Research’s Vaccine Pilot Plant, part of the Vaccine Clinical Materials Program (VCMP), is helping researchers produce investigational Zika vaccines for a new round of clinical trials. The plant has been

  18. Technical basis for external dosimetry at the Waste Isolation Pilot Plant (WIPP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, E.W.; Wu, C.F.; Goff, T.E.

    1993-12-31

    The WIPP External Dosimetry Program, administered by Westinghouse Electric Corporation, Waste Isolation Division, for the US Department of Energy (DOE), provides external dosimetry support services for operations at the Waste Isolation Pilot Plant (WIPP) Site. These operations include the receipt, experimentation with, storage, and disposal of transuranic (TRU) wastes. This document describes the technical basis for the WIPP External Radiation Dosimetry Program. The purposes of this document are to: (1) provide assurance that the WIPP External Radiation Dosimetry Program is in compliance with all regulatory requirements, (2) provide assurance that the WIPP External Radiation Dosimetry Program is derived from amore » sound technical base, (3) serve as a technical reference for radiation protection personnel, and (4) aid in identifying and planning for future needs. The external radiation exposure fields are those that are documented in the WIPP Final Safety Analysis Report.« less

  19. Operating boundaries of full-scale advanced water reuse treatment plants: many lessons learned from pilot plant experience.

    PubMed

    Bele, C; Kumar, Y; Walker, T; Poussade, Y; Zavlanos, V

    2010-01-01

    Three Advanced Water Treatment Plants (AWTP) have recently been built in South East Queensland as part of the Western Corridor Recycled Water Project (WCRWP) producing Purified Recycled Water from secondary treated waste water for the purpose of indirect potable reuse. At Luggage Point, a demonstration plant was primarily operated by the design team for design verification. The investigation program was then extended so that the operating team could investigate possible process optimisation, and operation flexibility. Extending the demonstration plant investigation program enabled monitoring of the long term performance of the microfiltration and reverse osmosis membranes, which did not appear to foul even after more than a year of operation. The investigation primarily identified several ways to optimise the process. It highlighted areas of risk for treated water quality, such as total nitrogen. Ample and rapid swings of salinity from 850 to 3,000 mg/l-TDS were predicted to affect the RO process day-to-day operation and monitoring. Most of the setpoints used for monitoring under HACCP were determined during the pilot plant trials.

  20. Fuel-Flexible Gasification-Combustion Technology for Production of H2 and Sequestration-Ready CO2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George Rizeq; Janice West; Raul Subia

    GE Global Research is developing an innovative energy technology for coal gasification with high efficiency and near-zero pollution. This Unmixed Fuel Processor (UFP) technology simultaneously converts coal, steam and air into three separate streams of hydrogen-rich gas, sequestration-ready CO{sub 2}, and high-temperature, high-pressure vitiated air to produce electricity in gas turbines. This is the draft final report for the first stage of the DOE-funded Vision 21 program. The UFP technology development program encompassed lab-, bench- and pilot-scale studies to demonstrate the UFP concept. Modeling and economic assessments were also key parts of this program. The chemical and mechanical feasibility weremore » established via lab and bench-scale testing, and a pilot plant was designed, constructed and operated, demonstrating the major UFP features. Experimental and preliminary modeling results showed that 80% H{sub 2} purity could be achieved, and that a UFP-based energy plant is projected to meet DOE efficiency targets. Future work will include additional pilot plant testing to optimize performance and reduce environmental, operability and combined cycle integration risks. Results obtained to date have confirmed that this technology has the potential to economically meet future efficiency and environmental performance goals.« less

  1. Installation Restoration Program. Phase I. Records Search. Seymour Johnson Air Force Base, North Carolina.

    DTIC Science & Technology

    1982-07-01

    and waste treatment pilot plants . Developed odor control program which suc- cessfully reduced odor emissions and represented Union Carbide at a public...the runway where oil and grease has been detected as well as the discharge from the City of Goldsboro waste- water treatment plant which occurs within...There are no known threatened or en- dangered plant species on base. The only endangered animal species which may potentially inhabit the base is the Red

  2. Geothermal pilot study final report: creating an international geothermal energy community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bresee, J.C.; Yen, W.W.S.; Metzler, J.E.

    The Geothermal Pilot Study under the auspices of the Committee on the Challenges of Modern Society (CCMS) was established in 1973 to apply an action-oriented approach to international geothermal research and development, taking advantage of the established channels of governmental communication provided by the North Atlantic Treaty Organization (NATO). The Pilot Study was composed of five substudies. They included: computer-based information systems; direct application of geothermal energy; reservoir assessment; small geothermal power plants; and hot dry rock concepts. The most significant overall result of the CCMS Geothermal Pilot Study, which is now complete, is the establishment of an identifiable communitymore » of geothermal experts in a dozen or more countries active in development programs. Specific accomplishments include the creation of an international computer file of technical information on geothermal wells and fields, the development of studies and reports on direct applications, geothermal fluid injection and small power plants, and the operation of the visiting scientist program. In the United States, the computer file has aready proven useful in the development of reservoir models and of chemical geothermometers. The state-of-the-art report on direct uses of geothermal energy is proving to be a valuable resource document for laypersons and experts in an area of increasing interest to many countries. Geothermal fluid injection studies in El Salvador, New Zealand, and the United States have been assisted by the Reservoir Assessment Substudy and have led to long-range reservoir engineering studies in Mexico. At least seven small geothermal power plants are in use or have been planned for construction around the world since the Small Power Plant Substudy was instituted--at least partial credit for this increased application can be assigned to the CCMS Geothermal Pilot Study. (JGB)« less

  3. The 10 MWe solar thermal central receiver pilot plant solar facilities design integration, RADL item 1-10

    NASA Astrophysics Data System (ADS)

    1980-08-01

    Work on the plant support subsystems and engineering services is reported. The master control system, thermal storage subsystem, receiver unit, and the beam characterization system were reviewed. Progress in program management and system integration is highlighted.

  4. Development of a pilot-scale kinetic extruder feeder system and test program. Phase II. Verification testing. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1984-01-12

    This report describes the work done under Phase II, the verification testing of the Kinetic Extruder. The main objective of the test program was to determine failure modes and wear rates. Only minor auxiliary equipment malfunctions were encountered. Wear rates indicate useful life expectancy of from 1 to 5 years for wear-exposed components. Recommendations are made for adapting the equipment for pilot plant and commercial applications. 3 references, 20 figures, 12 tables.

  5. Report on SARS backfit evaluation, Exxon Donor Solvent Plant, Baytown, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meyer, A.F. Jr.

    1980-07-02

    This report provides information on observations, findings, and conclusions arising from a site visit to the Exxon Donor Solvent Plant, Baytown, Texas. That visit was to provide technical assistance and professional services to the DOE/ASFE/OPTA Project Officer regarding verification of his initial determination that this pilot plant is exempt from the SARS backfit requirement (DOE Order 5481.1). A secondary purpose was to obtain further information regarding the occupational safety and health plans and procedures at this new pilot plant facility. It is concluded that a well planned and implemented occupational safety and health program exists at the Exxon Donor Solventmore » Plant. Excellent manuals regarding general safety requirements and protection against carcinogens have been prepared and distributed. A Safe Operations Committee is in effect as is a Risk Management Committee. Adequate safety and industrial hygiene staff has been assigned and an excellent medical surveillance program has been established. Adequate compliance with environmental codes, standards, and regulations is being achieved. Although this plant is not subject to SARS because of the nature of the contract, adequate documentation exists in any case to exempt it from the SARS backfit requirement.« less

  6. Cocurrent scrubber evaluation: TVA's Colbert lime-limestone wet-scrubbing pilot plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hollinden, G.A.; Robards, R.F.; Moore, N.D.

    1979-01-01

    The Tennessee Valley Authority (TVA) is actively engaged in a pilot plant program to develop and/or evaluate wet-scrubbing processes for removing sulfur dioxide (SO/sub 2/) from boiler flue gas. The physical size and general arrangement of flue gas scrubbing systems have a major impact on capital investment and operating cost, as do potential operating and maintenance advantages inherent to some systems. The equipment configuration for a cocurrent scrubber reflects some of these advantages. EPRI funded TVA to perform preliminary screening tests at TVA's 1 MW pilot plant (Colbert Steam Plant) to develop operating data on the cocurrent design for usemore » in designing and operating a 10 MW prototype cocurrent scrubber at TVA's Shawnee Scrubber Test Facility. Results of Colbert tests showed excellent sulfur dioxide removal efficiencies, generally greater than 85%, low pressure drop, and high particulate removal efficiencies. This report covers these screening tests. The results indicate that commercial application of the cocurrent scrubber concept may save substantial capital investment by reducing the number of scrubber modules and auxiliary equipment. These evaluation tests provided the basis for the design and construction of the 10 MW cocurrent scrubber at the Shawnee Facility. Operation of this scrubber began in August 1978 to develop the scale-up similarities and differences between the Colbert test program (1 MW) and the Shawnee test program (10 MW). It also demonstrated the practicality and reliability of the 10 MW prototype. Detailed results of the prototype test series will be available in late 1979.« less

  7. Postgraduate Training in Student Learning and Teaching.

    ERIC Educational Resources Information Center

    Alpay, E.; Mendes-Tatsis, M. A.

    2000-01-01

    Presents an experiential postgraduate training program for student learning and supervision involving laboratory and pilot plant supervisions in the chemical engineering field. The program addresses some of the current concerns about non-technical training and the further development of the broad science and engineering knowledge of postgraduate…

  8. Concrete containment aging study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pachner, J.; Tai, T.M.; Naus, D.

    1994-04-01

    In 1989, IAEA initiated a pilot study on the management of aging of nuclear power plant components. The Phase I and II studies of concrete containment are discussed. With the data base, plant owners will be able to review and enhance their existing programs. IAEA will analyze data provided by participating plants and the report is scheduled to be released by late 1994 (final report release mid-1995).

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ellingson, W.A.

    This broad-base materials engineering program, begun in October 1974, includes studies on both ceramic (refractory) and metallic materials presently being used or intended for use in coal-conversion systems. Appropriate laboratory and field experiments are integrated such that the results have immediate impact on the present pilot-plant and proposed demonstration-plant designs. The report presents the technical accomplishments.

  10. TRANSURANIC STUDIES STATUS AND PROBLEM STATEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leuze, R E

    1959-04-29

    The purpose of the Transuranics Program is to develop separation processes for the transuranic elements, primarily those produced by long-term neutron irradiation of Pu/sup 239/. The program includes laboratory process development, pilot-plant process testing, processing of 10 kg of Pu/sup 239/ irradiated to greater than 99% burn-up for plutonium and americium-curium recovery, and processing the reirradiated plutonium and americium-curium fractions. The proposed method for processing highly irradiated plutonium is: (1) plutonium-aluminum alloy dissolution in HNO/sub 3/; (2) plutonium recovery by TBP extraction; (3) americium, curium, and rare-earth extraction by TBP from neutral nitrate solution; (4) partial rare-earth removal (primarily lanthanum)more » by americium-curium extraction into 100% TBP from 15M HNO/sub 3/; (5) additional rare-earth removal by extraction in 0.48M mono-2-ethylhexylphosphoric acid from 12M HCl; and (6) americium-curium purification by chloride anion exchange. Processing through the 100% TBP, 15M HNO/sub 3/ cycle can be carried out in the Power Reactor Fuel Reprocessing Pilot Plant. New facilities are proposed 15M HNO/ sub 3/ cycle can be carried out in the Power Reactor Fuel Reprocessing Pilot Plant. New facilities are proposed for laboratory process development studies and the final processing of the transplutonic elements. (auth)« less

  11. DOE's Remote-Handled TRU Waste Characterization Program: Implementation Plan

    EPA Pesticide Factsheets

    Remote-handled (RH) transuranic (TRU) waste characterization, which involves obtaining chemical, radiological, and physical data, is a primary component of ensuring compliance of the Waste Isolation Pilot Plant (WIPP) with regulatory requirements.

  12. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the offers exceed the acreage limitation in the State, CCC will conduct a lottery style selection... a program of crop rotation on the farm to achieve agronomic and pest and disease management benefits...

  13. TASK 2: QUENCH ZONE SIMULATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fusselman, Steve

    Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. A key feature of the AR gasifier design is the transition from the gasifier outlet into the quench zone, where the raw syngas is cooled to ~ 400°C by injection and vaporization of atomized water. Earlier pilot plant testing revealed a propensity for the original gasifier outlet design to accumulate slag in the outlet, leading to erratic syngas flow from themore » outlet. Subsequent design modifications successfully resolved this issue in the pilot plant gasifier. In order to gain greater insight into the physical phenomena occurring within this zone, AR developed a cold flow simulation apparatus with Coanda Research & Development with a high degree of similitude to hot fire conditions with the pilot scale gasifier design, and capable of accommodating a scaled-down quench zone for a demonstration-scale gasifier. The objective of this task was to validate similitude of the cold flow simulation model by comparison of pilot-scale outlet design performance, and to assess demonstration scale gasifier design feasibility from testing of a scaled-down outlet design. Test results did exhibit a strong correspondence with the two pilot scale outlet designs, indicating credible similitude for the cold flow simulation device. Testing of the scaled-down outlet revealed important considerations in the design and operation of the demonstration scale gasifier, in particular pertaining to the relative momentum between the downcoming raw syngas and the sprayed quench water and associated impacts on flow patterns within the quench zone. This report describes key findings from the test program, including assessment of pilot plant configuration simulations relative to actual results on the pilot plant gasifier and demonstration plant design recommendations, based on cold flow simulation results.« less

  14. A Review of the Status and Projections for the Dade County Quinmester Extended School Year Program.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    This document summarizes the background of the Dade County Quinmester Extended School Year Program involving five high schools in a pilot project. The program resulted from a study of alternative plant utilization plans for the most efficient use of school facilities to reduce the need for capital expenditure during the next five years. Discussed…

  15. Solar Pilot Plant, Phase I. Preliminary design report. Volume II, Book 2. Central receiver optical model users manual. CDRL item 2. [HELIAKI code

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1977-05-01

    HELIAKI is a FORTRAN computer program which simulates the optical/thermal performance of a central receiver solar thermal power plant for the dynamic conversion of solar-generated heat to electricity. The solar power plant which this program simulates consists of a field of individual sun tracking mirror units, or heliostats, redirecting sunlight into a cavity, called the receiver, mounted atop a tower. The program calculates the power retained by that cavity receiver at any point in time or the energy into the receiver over a year's time using a Monte Carlo ray trace technique to solve the multiple integral equations. An artist'smore » concept of this plant is shown.« less

  16. Integrating Waste Heat from CO 2 Removal and Coal-Fired Flue Gas to Increase Plant Efficiency

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irvin, Nick; Kowalczyk, Joseph

    In project DE-FE0007525, Southern Company Services demonstrated heat integration methods for the capture and sequestration of carbon dioxide produced from pulverized coal combustion. A waste heat recovery technology (termed High Efficiency System) from Mitsubishi Heavy Industries America was integrated into an existing 25-MW amine-based CO 2 capture process (Kansai Mitsubishi Carbon Dioxide Recovery Process®1) at Southern Company’s Plant Barry to evaluate improvements in the energy performance of the pulverized coal plant and CO 2 capture process. The heat integration system consists of two primary pieces of equipment: (1) the CO 2 Cooler which uses product CO 2 gas from themore » capture process to heat boiler condensate, and (2) the Flue Gas Cooler which uses air heater outlet flue gas to further heat boiler condensate. Both pieces of equipment were included in the pilot system. The pilot CO 2 Cooler used waste heat from the 25-MW CO 2 capture plant (but not always from product CO 2 gas, as intended). The pilot Flue Gas Cooler used heat from a slipstream of flue gas taken from downstream of Plant Barry’s air heater. The pilot also included a 0.25-MW electrostatic precipitator. The 25-MW High Efficiency System operated for approximately six weeks over a four month time period in conjunction with the 25-MW CO 2 capture facility at Plant Barry. Results from the program were used to evaluate the technical and economic feasibility of full-scale implementation of this technology. The test program quantified energy efficiency improvements to a host power plant that could be realized due to the High Efficiency System. Through the execution of this project, the team verified the integrated operation of the High Efficiency System and Kansai Mitsubishi Carbon Dioxide Recovery Process®. The ancillary benefits of the High Efficiency System were also quantified, including reduced water consumption, a decrease in toxic air emissions, and better overall air quality control systems performance.« less

  17. 40 CFR 194.5 - Publications incorporated by reference.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION PROGRAMS CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S... availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register...

  18. 40 CFR 194.5 - Publications incorporated by reference.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROTECTION PROGRAMS CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S... availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register...

  19. 40 CFR 194.5 - Publications incorporated by reference.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION PROGRAMS CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S... availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register...

  20. 40 CFR 194.5 - Publications incorporated by reference.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROTECTION PROGRAMS CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S... availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register...

  1. Large Pilot Scale Testing of Linde/BASF Post-Combustion CO 2 Capture Technology at the Abbott Coal-Fired Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Brien, Kevin C.

    The work summarized in this report is the first step towards a project that will re-train and create jobs for personnel in the coal industry and continue regional economic development to benefit regions impacted by previous downturns. The larger project is aimed at capturing ~300 tons/day (272 metric tonnes/day) CO 2 at a 90% capture rate from existing coal- fired boilers at the Abbott Power Plant on the campus of University of Illinois (UI). It will employ the Linde-BASF novel amine-based advanced CO 2 capture technology, which has already shown the potential to be cost-effective, energy efficient and compact atmore » the 0.5-1.5 MWe pilot scales. The overall objective of the project is to design and install a scaled-up system of nominal 15 MWe size, integrate it with the Abbott Power Plant flue gas, steam and other utility systems, and demonstrate the viability of continuous operation under realistic conditions with high efficiency and capacity. The project will also begin to build a workforce that understands how to operate and maintain the capture plants by including students from regional community colleges and universities in the operation and evaluation of the capture system. This project will also lay the groundwork for follow-on projects that pilot utilization of the captured CO 2 from coal-fired power plants. The net impact will be to demonstrate a replicable means to (1) use a standardized procedure to evaluate power plants for their ability to be retrofitted with a pilot capture unit; (2) design and construct reliable capture systems based on the Linde-BASF technology; (3) operate and maintain these systems; (4) implement training programs with local community colleges and universities to establish a workforce to operate and maintain the systems; and (5) prepare to evaluate at the large pilot scale level various methods to utilize the resulting captured CO 2. Towards the larger project goal, the UI-led team, together with Linde, has completed a preliminary design for the carbon capture pilot plant with basic engineering and cost estimates, established permitting needs, identified approaches to address Environmental, Health, and Safety concerns related to pilot plant installation and operation, developed approaches for long-term use of the captured carbon, and established strategies for workforce development and job creation that will re-train coal operators to operate carbon capture plants. This report describes Phase I accomplishments and demonstrates that the project team is well-prepared for full implementation of Phase 2, to design, build, and operate the carbon capture pilot plant.« less

  2. Raymond Hansen | NREL

    Science.gov Websites

    Raymond Hansen Photo of Raymond Hansen Raymond Hansen Industrial Research Equipment Technician Pyrolysis Areas of Expertise Industrial equipment fabrication specialist Pilot plant operator/trainer Education Industrial Science Program, Red Rocks Community College, 2006-present Professional Experience

  3. Final environmental impact statement. Waste Isolation Pilot Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures aremore » given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)« less

  4. GUIDELINES FOR IMPLEMENTATION OF THE PILOT PROGRAM FOR EMOTIONALLY DISTURBED CHILDREN. A SUPPLEMENT TO THE STATE PLAN FOR SPECIAL EDUCATION.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    IN 1965-66, 14 SCHOOL DISTRICTS ESTABLISHED 20 CLASSES IN SCHOOLS, MENTAL HEALTH CENTERS, AND HOSPITALS FOR EMOTIONALLY DISTURBED CHILDREN (AGES 6 THROUGH 17). OUTLINED WERE DEFINITIONS AND CHARACTERISTICS OF EMOTIONALLY DISTURBED CHILDREN, PURPOSES OF THE PROGRAM, MINIMUM PLANT FACILITIES, RELATED PERSONNEL, ELIGIBILITY REQUIREMENTS, CLASS SIZE…

  5. 7 CFR 1412.48 - Planting Transferability Pilot Project.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Planting Transferability Pilot Project. 1412.48... and Peanuts 2008 through 2012 § 1412.48 Planting Transferability Pilot Project. (a) Notwithstanding § 1412.47, for each of the 2009 and subsequent crop years, the Planting Transferability Pilot Project...

  6. Conceptual design of advanced central receiver power systems sodium-cooled receiver concept. Volume 1. Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-06-01

    The conceptual design of an advanced central receiver power system using liquid sodium as a heat transport medium has been completed by a team consisting of the Energy Systems Group (prime contractor), McDonnell Douglas, Stearns-Roger, The University of Houston, and Salt River Project. The purpose of this study was to determine the technical and economic advantages of this concept for commercial-scale power plants. This final report covers all tasks of the project. These tasks were as follows: (1) review and analysis of preliminary specification; (2) parametric analysis; (3) select commercial configuration; (4) commercial plant conceptual design; (5) assessment of commercialmore » plant; (6) advanced central receiver power system development plan; (7) program plan; (8) reports and data; (9) program management; and (10) safety analysis. A programmatic overview of the accomplishments of this program is given. The 100-MW conceptual commercial plant, the 281-MW optimum plant, and the 10-MW pilot plant are described. (WHK)« less

  7. EXXON donor solvent coal liquefaction process

    NASA Technical Reports Server (NTRS)

    Epperly, W. R.; Swabb, L. E., Jr.; Tauton, J. W.

    1978-01-01

    A solvent coal liquefaction process to produce low-sulfur liquid products from a wide range of coals is described. An integrated program of laboratory and engineering research and development in conjunction with operation of a 250 T/D pilot plant is discussed.

  8. Local area networks, laboratory information management systems, languages, and operating systems in the lab and pilot plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dessy, R.E.

    1983-08-01

    Microprocessors and microcomputers are being incorporated into the instruments and controllers in our laboratory and pilot plant. They enhance both the quality and amount of information that is produced. Yet they simultaneously produce vast amounts of information that must be controlled, or scientists and engineers will become high priced secretaries. The devices need programs that control them in a time frame relevant to the experiment. Simple, expeditious pathways to the generation of software that will run rapidly is essential or first class scientists and engineers become second class system programmersexclamation This paper attempts to develop the vocabulary by which themore » people involved in this technological revolution can understand and control it. We will examine the elements that synergistically make up the electronic laboratory and pilot plant. More detailed analyses of each area may be found in a series of articles entitled A/C INTERFACE (1-4). Many factors interact in the final system that we bring into our laboratory. Yet many purchasers only perform a cursory evaluation on the superficial aspects of the hardware. The integrated lab and pilot plant require that microprocessors, which control and collect, be connected in a LAN to larger processors that can provide LIMS support. Statistics and scientific word processing capabilities then complete the armamentorium. The end result is a system that does things for the user, rather than doing things to him.« less

  9. Waste Isolation Pilot Plant site environmental report, for calendar year 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar yearmore » are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site.« less

  10. TECHNOLOGY EVALUATION REPORT: TORONTO HARBOUR COMMISSIONERS (THC) SOIL RECYCLE TREATMENT TRAIN. Project Summary

    EPA Science Inventory

    A demonstration of the Toronto Harbour Commissioners' (THC) Soil Recycle Treatment Train was performed under the Superfund Innovative Technology Evaluation (SITE) Program at a pilot plant facility in Toronto, Ontario, Canada. The Soil Recycle Treatment Train, which consists of s...

  11. 40 CFR 194.24 - Waste characterization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... system. (e) Waste may be emplaced in the disposal system only if the emplaced components of such waste... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Waste characterization. 194.24 Section... PROGRAMS CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S...

  12. 40 CFR 194.24 - Waste characterization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system. (e) Waste may be emplaced in the disposal system only if the emplaced components of such waste... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Waste characterization. 194.24 Section... PROGRAMS CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S...

  13. 40 CFR 194.24 - Waste characterization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... system. (e) Waste may be emplaced in the disposal system only if the emplaced components of such waste... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Waste characterization. 194.24 Section... PROGRAMS CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S...

  14. 40 CFR 194.24 - Waste characterization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... system. (e) Waste may be emplaced in the disposal system only if the emplaced components of such waste... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Waste characterization. 194.24 Section... PROGRAMS CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S...

  15. 27 CFR 25.272 - Application.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF THE TREASURY LIQUORS BEER Pilot Brewing Plants § 25.272 Application. (a) Form of application. Any person desiring to establish a pilot brewing plant under the subpart shall file an application with the... operation of a pilot brewing plant if it is determined that the plant will be operated solely for one or...

  16. 27 CFR 25.272 - Application.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF THE TREASURY LIQUORS BEER Pilot Brewing Plants § 25.272 Application. (a) Form of application. Any person desiring to establish a pilot brewing plant under the subpart shall file an application with the... operation of a pilot brewing plant if it is determined that the plant will be operated solely for one or...

  17. Project BudBurst: Citizen Science for All Seasons

    NASA Astrophysics Data System (ADS)

    Henderson, S.; Brewer, C.; Havens, K.; Meymaris, K.

    2007-12-01

    Project BudBurst is a national citizen science initiative designed to engage the public in observations of phenological (plant life cycle) events that raise awareness of climate change, and create a cadre of informed citizen scientists. Citizen science programs such as Project BudBurst provide the opportunity for students and interested laypersons to actively participate in scientific research. Such programs are important not only from an educational perspective, but because they also enable scientists to broaden the geographic and temporal scale of their observations. Project BudBurst launched a pilot program in the Spring of 2007. The goals of Project BudBurst were to 1) increase awareness of phenology as an area of scientific study; 2) Increase awareness of the impacts of changing climates on plants; and 3) increase science literacy by engaging participants in the scientific process. From April through mid-June 2007, this on-line educational and data-entry program, engaged participants of all ages and walks of life in recording the timing of the leafing and flowering of ~60 easily identifiable, broadly distributed wild and cultivated species found across the continent. We will report on the results of the pilot project and discuss plans to expand Project BudBurst as it becomes a year round event beginning in 2008. A broad consortium of collaborators, representing the Chicago Botanic Garden, Plant Conservation Alliance, ESRI, the USA-National Phenology Network, University Corporation for Atmospheric Research, University of Arizona, University of Montana, University of California-Santa Barbara, University of Wisconsin-Milwaukee and the University of Wisconsin-Madison, came together to design and implement Project BudBurst with seed funding from the U.S. Bureau of Land Management, the National Phenology Network (through a RCN grant from the NSF), and the Plant Conservation Alliance.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aegerter, P.A.

    Phillips Petroleum Company scientists and engineers have been operating petroleum refining and separations pilot plants for five years in the Process Development Center. The 26 pilot plants in this building, with one exception, operate under complete computer-control, allowing maximum utilization of limited operating manpower. This centralization and automation of pilot plants has allowed Phillips to more than double the number of operating pilot plants in the petroleum refining area without an increase in manpower. At the same time, the quantity and quality of data has increased correspondingly. This paper discusses Phillips philosophy of operation and management of these pilot plants.more » In addition, details of day-to-day operations and a brief description of the control system are also presented.« less

  19. Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, S.M.; Sands, M.D.; Donat, J.R.

    This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed actionmore » will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)« less

  20. Engineering Education Problems. The Laboratory Equipment Factor.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    Presented is a pilot study focusing attention on problems of deteriorating physical plants and inadequate/obsolete equipment contributing to the current crisis in engineering education. Data are reported from a survey instrument (included in an appendix) from 26 colleges/universities, representing 168 programs out of a national total of 1212…

  1. Environmental Progress Through Cooperation in Education.

    ERIC Educational Resources Information Center

    Horn, Barbara, Ed.

    The program agenda, roster of participants, report of the business meeting, and resolutions passed at the conference are reported in these proceedings. Presentations made at the meeting are reproduced in full or summarized. These include: TVA--A Pilot Plant in Environmental Education; Why an Energy Shortage?; Role of National Organizations in…

  2. Adjunct laboratory tests in support of US/German salt characterization program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buchholz, Stuart A.

    2014-07-01

    In summary, the goal of this activity is to complete a subset of a test matrix on salt from the Waste Isolation Pilot Plant (WIPP) undertaken by German research groups. The work will be performed at RESPEC in Rapid City, South Dakota, and is divided into three tasks.

  3. MINI PILOT PLANT FOR DRINKING WATER RESEARCH

    EPA Science Inventory

    The Water Supply & Water Resources Division (WSWRD) has constructed 2 mini-pilot plant systems used to conduct drinking water research. These two systems each have 2 parallel trains for comparative research. The mini-pilot plants are small conventional drinking water treatment ...

  4. Direct Reduction Processes for the Production of Titanium Metal. Report of the Ad Hoc Panel of the Committee on Technical Aspects of Critical and Strategic Materials

    DTIC Science & Technology

    1974-03-01

    Members Dr. Nevin K. Hiester Director, Technoeconomics Program Stanford Research Institute Menlo Park, California 94025 Dr. Michael Hoch...Titanium Sponge Statistics 11 TABLE II. Plants for the Production of Titanium Sponge 12 TABLE III. Estimated Sponge Production...de Nemours and Co. built the first nongovernment pilot plant . That year is considered the start of small-scale commercial pro- duction of

  5. 27 CFR 25.271 - General.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TREASURY LIQUORS BEER Pilot Brewing Plants § 25.271 General. (a) Establishment. A person may establish and operate a pilot brewing plant off the brewery premises for research, analytical, experimental, or developmental purposes relating to beer or brewery operations. Pilot brewing plants will be established as...

  6. 27 CFR 25.271 - General.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... TREASURY LIQUORS BEER Pilot Brewing Plants § 25.271 General. (a) Establishment. A person may establish and operate a pilot brewing plant off the brewery premises for research, analytical, experimental, or developmental purposes relating to beer or brewery operations. Pilot brewing plants will be established as...

  7. F-18 HARV research pilot Dana Purifoy

    NASA Technical Reports Server (NTRS)

    1996-01-01

    Dana D. Purifoy is an aerospace research pilot at NASA's Dryden Flight Research Center, Edwards, California. He joined NASA in August 1994. Purifoy is a former Air Force test pilot who served as a project pilot in the joint NASA/Air Force X-29 Forward Swept Wing research program conducted at Dryden from 1984 to 1991. His most recent assignment in the Air Force was flying U-2 aircraft as a test pilot at Air Force Plant 42, Palmdale, CA. In addition to flying the X-29 at Dryden as an Air Force pilot, Purifoy also served as project pilot and joint test force director with the AFTI F-16 (Advanced Fighter Technology Integration/F-16) program, also located at Dryden. Before his assignments as project pilot on the X-29 and AFTI/F-16 aircraft, Purifoy was chief of the Academics Systems Branch at the Air Force Test Pilot School at Edwards. Prior to becoming a test pilot, he flew F-111 and F-16 aircraft in Great Britain and Germany. He has accumulated 3800 hours of flying time in his career. The final flight for the F-18 High Alpha Research Vehicle (HARV) took place at NASA Dryden on May 29, 1996. The highly modified F-18 airplane flew 383 flights over a nine year period and demonstrated concepts that greatly increase fighter maneuverability. Among concepts proven in the aircraft is the use of paddles to direct jet engine exhaust in cases of extreme altitudes where conventional control surfaces lose effectiveness. Another concept, developed by NASA Langley Research Center, is a deployable wing-like surface installed on the nose of the aircraft for increased right and left (yaw) control on nose-high flight angles.

  8. 27 CFR 25.276 - Operations and records.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF THE TREASURY LIQUORS BEER Pilot Brewing Plants § 25.276 Operations and records. (a) Commencement of operations. A person may commence operation of a pilot brewing plant upon receipt of the approved application and bond. (b) Reports. The operator of a pilot brewing plant is not required to file...

  9. 27 CFR 25.274 - Bond.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... TREASURY LIQUORS BEER Pilot Brewing Plants § 25.274 Bond. (a) Requirement. Any person requesting authorization to establish a pilot brewing plant under this subpart shall execute and file a brewer's bond, Form 5130.22. A person may not begin operation of a pilot brewing plant until receiving notice from the...

  10. 27 CFR 25.274 - Bond.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TREASURY LIQUORS BEER Pilot Brewing Plants § 25.274 Bond. (a) Requirement. Any person requesting authorization to establish a pilot brewing plant under this subpart shall execute and file a brewer's bond, Form 5130.22. A person may not begin operation of a pilot brewing plant until receiving notice from the...

  11. 27 CFR 25.276 - Operations and records.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF THE TREASURY LIQUORS BEER Pilot Brewing Plants § 25.276 Operations and records. (a) Commencement of operations. A person may commence operation of a pilot brewing plant upon receipt of the approved application and bond. (b) Reports. The operator of a pilot brewing plant is not required to file...

  12. Preliminary summary of the ETF conceptual studies

    NASA Technical Reports Server (NTRS)

    Seikel, G. R.; Bercaw, R. W.; Pearson, C. V.; Owens, W. R.

    1978-01-01

    Power plant studies have shown the attractiveness of MHD topped steam power plants for baseload utility applications. To realize these advantages, a three-phase development program was initiated. In the first phase, the engineering data and experience were developed for the design and construction of a pilot plant, the Engineering Test Facility (ETF). Results of the ETF studies are reviewed. These three parallel independent studies were conducted by industrial teams led by the AVCO Everett Research Laboratory, the General Electric Corporation, and the Westinghouse Corporation. A preliminary analysis and the status of the critical evaluation of these results are presented.

  13. 40 CFR 194.53 - Consideration of underground sources of drinking water.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Consideration of underground sources of drinking water. 194.53 Section 194.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) RADIATION PROTECTION PROGRAMS CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S COMPLIANCE WITH THE...

  14. 40 CFR 194.53 - Consideration of underground sources of drinking water.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Consideration of underground sources of drinking water. 194.53 Section 194.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) RADIATION PROTECTION PROGRAMS CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S COMPLIANCE WITH THE...

  15. No-migration variance petition. Appendices C--J: Volume 5, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-03-01

    Volume V contains the appendices for: closure and post-closure plans; RCRA ground water monitoring waver; Waste Isolation Division Quality Program Manual; water quality sampling plan; WIPP Environmental Procedures Manual; sample handling and laboratory procedures; data analysis; and Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant.

  16. Multi-Input Multi-Output Flight Control System Design for the YF-16 Using Nonlinear QFT and Pilot Compensation

    DTIC Science & Technology

    1990-12-01

    methods are implemented in MATRIXx with the programs SISOTF and MIMOTF respectively. Following the mathe - matical development, the application of these...intent is not to teach any of the methods , it has been written in a manner to significantly assist an individual attempting follow on work. I would...equivalent plant models. A detailed mathematical development of the method used to develop these equivalent LTI plant models is provided. After this inner

  17. Saturn Apollo Program

    NASA Image and Video Library

    1969-07-09

    In this photograph, a laboratory technician handles a portion of the more than 20 different plant lines that were used within the Lunar Receiving Laboratory, Building 37 of the Manned Spacecraft Center (MSC) in Houston, Texas. This laboratory was part of the overall physical, chemical, and biological test program of the Apollo 11 returned lunar samples. Aboard the Marshall Space Flight Center (MSFC) developed Saturn V launch vehicle, the Apollo 11 mission launched from The Kennedy Space Center, Florida on July 16, 1969 and safely returned to Earth on July 24, 1969. The 3-man crew aboard the flight consisted of astronauts Neil A. Armstrong, commander; Edwin Aldrin, Lunar Module (LM) pilot; and Michael Collins, Command Module (CM) pilot. The CM, piloted by Michael Collins remained in a parking orbit around the Moon while the LM, named “Eagle’’, carrying astronauts Neil Armstrong and Edwin Aldrin, landed on the Moon. In 2 1/2 hours, the crew collected 47 pounds of lunar surface material which was returned to Earth for analysis.

  18. 49 CFR 381.400 - What is a pilot program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false What is a pilot program? 381.400 Section 381.400... PILOT PROGRAMS Initiation of Pilot Programs § 381.400 What is a pilot program? (a) A pilot program is a... that would be subject to the regulations. (b) During a pilot program, the participants would be given...

  19. 49 CFR 381.400 - What is a pilot program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false What is a pilot program? 381.400 Section 381.400... PILOT PROGRAMS Initiation of Pilot Programs § 381.400 What is a pilot program? (a) A pilot program is a... that would be subject to the regulations. (b) During a pilot program, the participants would be given...

  20. Coal desulfurization by low temperature chlorinolysis, phase 2

    NASA Technical Reports Server (NTRS)

    Kalvinskas, J. J.; Grohmann, K.; Rohatgi, N.; Ernest, J.; Feller, D.

    1980-01-01

    An engineering scale reactor system was constructed and operated for the evaluation of five high sulfur bituminous coals obtained from Kentucky, Ohio, and Illinois. Forty-four test runs were conducted under conditions of 100 by 200 mesh coal,solvents - methlychloroform and water, 60 to 130 C, 0 to 60 psig, 45 to 90 minutes, and gaseous chlorine flow rate of up to 24 SCFH. Sulfur removals demonstrated for the five coals were: maximum total sulfur removal of 46 to 89% (4 of 5 coals with methylchloroform) and 0 to 24% with water. In addition, an integrated continuous flow mini-pilot plant was designed and constructed for a nominal coal rate of 2 kilograms/hour which will be operated as part of the follow-on program. Equipment flow sheets and design drawings are included for both the batch and continuous flow mini-pilot plants.

  1. The in-depth safety assessment (ISA) pilot projects in Ukraine.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kot, C. A.

    1998-02-10

    Ukraine operates pressurized water reactors of the Soviet-designed type, VVER. All Ukrainian plants are currently operating with annually renewable permits until they update their safety analysis reports (SARs). After approval of the SARS by the Ukrainian Nuclear Regulatory Authority, the plants will be granted longer-term operating licenses. In September 1995, the Nuclear Regulatory Authority and the Government Nuclear Power Coordinating Committee of Ukraine issued a new contents requirement for the safety analysis reports of VVERs in Ukraine. It contains requirements in three major areas: design basis accident (DBA) analysis, probabilistic risk assessment (PRA), and beyond design-basis accident (BDBA) analysis. Themore » DBA requirements are an expanded version of the older SAR requirements. The last two requirements, on PRA and BDBA, are new. The US Department of Energy (USDOE), through the International Nuclear Safety Program (INSP), has initiated an assistance and technology transfer program to Ukraine to assist their nuclear power stations in developing a Western-type technical basis for the new SARS. USDOE sponsored In-Depth Safety Assessments (ISAs) have been initiated at three pilot nuclear reactor units in Ukraine, South Ukraine Unit 1, Zaporizhzhya Unit 5, and Rivne Unit 1. USDOE/INSP have structured the ISA program in such a way as to provide maximum assistance and technology transfer to Ukraine while encouraging and supporting the Ukrainian plants to take the responsibility and initiative and to perform the required assessments.« less

  2. Environmental analysis Waste Isolation Pilot Plant (WIPP) cost reduction proposals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility to demonstrate the safe disposal of radioactive wastes resulting from the defense activities and programs of the United States government. The facility is planned to be developed in bedded salt at the Los Medanos site in southeastern New Mexico. The environmental consequences of contruction and operation of the WIPP facility are documented in ''Final Environmental Impact Statement, Waste Isolation Pilot Plant''. The proposed action addressed by this environmental analysis is to simplify and reduce the scope of the WIPP facility as it is currently designed. The proposed changesmore » to the existing WIPP design are: limit the waste storage rate to 500,000 cubic feet per year; eliminate one shaft and revise the underground ventilation system; eliminate the underground conveyor system; combine the Administration Building, the Underground Personnel Building and the Waste Handling Building office area; simplify the central monitoring system; simplify the security control systems; modify the Waste Handling Building; simplify the storage exhaust system; modify the above ground salt handling logistics; simplify the power system; reduce overall site features; simplify the Warehouse/Shops Building and eliminate the Vehicle Maintenance Building; and allow resource recovery in Control Zone IV.« less

  3. Combustion characterization of carbonized RDF, Joint Venture Task No. 7. Topical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    1995-04-30

    The overall objective of this research program was to demonstrate EnerTech's and the Energy & Environmental Research Center's (EERC) process of slurry carbonization for producing homogeneous, pumpable titels from refuse-derived fuel (RDF) with continuous pilot plant facilities, and to characterize flue gas and ash emissions from combustion of the carbonizd RDF slurry fuel. Please note that "Wet Thermal Oxidation" is EnerTech's trademark mme for combustion of the carbonized RDF slurry fuel. Carbonized RDF slurry fuels were produced with the EERC'S 7.5-tpd (wet basis) pilot plant facility. A hose diaphragm pump pressurized a 7- lo-wt% feed RDF slurry, with a viscositymore » of 500 cP, to approximately 2500 psig. The pressurized RDF slurry was heated by indirect heat exchangers to between 5850 -626°F, and its temperature and pressure was maintained in a downflow reactor. The carbonized slurry was flashed, concentrated in a filter press, and ground in an attritor. During operation of the pilot plant, samples of the feed RDF slurry, carbonization gas, condensate, carbonized solids, and filtrate were taken and analyzed. Pilot-scale slurry carbonization experiments with RDF produced a homogeneous pumpable slurry fuel with a higher heating value (HHV) of 3,000-6,600 Btu/lb (as-received basis), at a viscosity of 500 CP at 100 Hz decreasing, and ambient temperature. Greater-heating-value slurry fuels were produced at higher slurry carbonization temperatures. During slurry carbonization, polyvinyl chloride (PVC) plastics in the feed RDF also decompose to form hydrochloric acid and salts. Pilot-scale slurty carbonization experiments extracted 82-94% of the feed RDF chlorine content as chloride salts. Higher carbonization temperatures and higher alkali additions to the feed slurry produced a higher chlorine extraction.« less

  4. OTEC riser cable system, Phase II: conceptual design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-10-01

    Studies are summarized of conceptual designs of riser cable systems for OTEC pilot plants of both the spar and plantship configurations located at sites off the southeast coast of Puerto Rico. The studies utilize a baseline pilot plant riser cable, the design of which has been developed and reported on in other reports. Baseline riser cable systems for OTEC pilot plants are identified, system hardware consistent with these designs are conceptualized, and comparisons of the various system concepts are provided. It is concluded that there are three riser cable systems feasible for a spar pilot plant platform at the Puntamore » Yeguas site, and two riser cable systems feasible at the plantship pilot plant at the Punta Tuna site. Recommendations for further investigations in the areas of materials, hardware design and pre-installation site surveys are also addressed.« less

  5. Update on specified European R and D efforts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-10-01

    Information was collected for DOE on various European research programs of interest: Shell-Koppers coal gasification demonstration plant, fluidized-bed combustion pilot plant, a boiler super heat system, energy conservation on ships, waste heat utilization from large diesel engines and nuclear power plants and uranium enrichment plants, coal-water slurries with additive (CARBOGEL), electrostatic precipitators, radial inflow turbines, carbonization, heat pumps, heat exchangers, gas turbines, and research on heat resisting alloys and corrosion protection of these alloys. A number of organizations expressed a desire for creation of a formal interchange with DOE on specific subjects of mutual interest (one organization is unhappy aboutmore » furnishing information to DOE). (LTN)« less

  6. Syn-Fuel reciprocating charge pump improvement program. Quarterly technical project report, April-June 1984

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1984-01-01

    Major accomplishments during the second quarter of 1984 were completion of the Diaphragm Separation Seal clear liquid testing, and initiation of Phase III Field Testing. Diaphragm operational testing was conducted on a clear water test loop. The test goals were to ensure; mechanical reliability of the Diaphragm Seal, safe operation with simulated component failure, and proper operation of the Diaphragm Buffer Volume Control System. This latter system is essential in controlling the phasing of the diaphragm with its driving plunger. These tests were completed successfully. All operational problems were solved. However, it must be emphasized that the Diaphragm Seal wouldmore » be damaged by allowing the pump to operate in a cavitating condition for an extended period of time. A change in the Field Test phase of the program was made regarding choice of field test site. There is no operating Syn-Fuel pilot plant capable of inexpensively producing the slurry stream required for the reciprocating pump testing. The Field Tests will now be conducted by first testing the prototype pump and separation seals in an ambient temperature sand water slurry. This will determine resistence to abrasive wear and determine any operation problems at pressure over a lengthy period of time. After successful conclusion of these tests the pump and seals will be operated with a high temperature oil, but without solids, to identify any problems associated with thermal gradients, thermal shock and differential growth. After successful completion of the high temperature clean oil tests the pump will be deemed ready for in-line installation at a designated Syn-Fuel pilot plant. The above approach avoids the expense and complications of a separate hot slurry test loop. It also reduces risk of operational problems while in-line at the pilot plant. 5 figs.« less

  7. Benchmark Report on Key Outage Attributes: An Analysis of Outage Improvement Opportunities and Priorities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Germain, Shawn St.; Farris, Ronald

    2014-09-01

    Advanced Outage Control Center (AOCC), is a multi-year pilot project targeted at Nuclear Power Plant (NPP) outage improvement. The purpose of this pilot project is to improve management of NPP outages through the development of an AOCC that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report documents the results of a benchmarking effort to evaluate the transferability of technologies demonstrated at Idaho National Laboratory and the primary pilot project partner, Palo Verde Nuclear Generating Station. The initial assumption for this pilot project was that NPPs generally domore » not take advantage of advanced technology to support outage management activities. Several researchers involved in this pilot project have commercial NPP experience and believed that very little technology has been applied towards outage communication and collaboration. To verify that the technology options researched and demonstrated through this pilot project would in fact have broad application for the US commercial nuclear fleet, and to look for additional outage management best practices, LWRS program researchers visited several additional nuclear facilities.« less

  8. Cooperative fish-rearing programs in Hanford Site excess facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herborn, D.I.; Anderson, B.N.

    1994-05-01

    In, 1993, two successful fish-rearing pilot projects were conducted in Hanford Site 100 K Area water treatment pools (K Pools) that are excess to the US Department of Energy needs. Beginning this spring, two larger cooperative fish programs will be undertaken in the K Pools. One program will involve the Yakama Indian Nation, which will rear, acclimate, and release 500,000 fall chinook salmon. The other program involves the Washington Department of Fish and Wildlife, which will rear warm-water specie (walleye and channel catfish) for planting in state lakes. Renewed economic vitality is the goal expected from these and follow-on fishmore » programs.« less

  9. 76 FR 62813 - Pilot Program To Evaluate Proposed Proprietary Name Submissions; Public Meeting on Pilot Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ...] Pilot Program To Evaluate Proposed Proprietary Name Submissions; Public Meeting on Pilot Program Results... voluntary pilot program that enabled participating pharmaceutical firms to evaluate proposed proprietary... public meeting at the end of fiscal year 2011 to discuss the results of the pilot program, but the Agency...

  10. Central receiver solar thermal power system, Phase 1. CDRL item 2. Pilot plant preliminary design report. Volume VI. Electrical power generation and master control subsystems and balance of plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hallet, Jr., R. W.; Gervais, R. L.

    1977-10-01

    The requirements, performance, and subsystem configuration for both the Commercial and Pilot Plant electrical power generation subsystems (EPGS) and balance of plants are presented. The EPGS for both the Commercial Plant and Pilot Plant make use of conventional, proven equipment consistent with good power plant design practices in order to minimize risk and maximize reliability. The basic EPGS cycle selected is a regenerative cycle that uses a single automatic admission, condensing, tandem-compound double-flow turbine. Specifications, performance data, drawings, and schematics are included. (WHK)

  11. UV disinfection pilot plant study at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huffines, R.L.; Beavers, B.A.

    1993-05-01

    An ultraviolet light disinfection system pilot plant was operated at the Savannah River Site Central Shops sanitary wastewater treatment package plant July 14, 1992 through August 13, 1992. The purpose was to determine the effectiveness of ultraviolet light disinfection on the effluent from the small package-type wastewater treatment plants currently used on-site. This pilot plant consisted of a rack of UV lights suspended in a stainless steel channel through which a sidestream of effluent from the treatment plant clarifier was pumped. Fecal coliform analyses were performed on the influent to and effluent from the pilot unit to verify the disinfectionmore » process. UV disinfection was highly effective in reducing fecal coliform colonies within NPDES permit limitations even under process upset conditions. The average fecal coliform reduction exceeded 99.7% using ultraviolet light disinfection under normal operating conditions at the package treatment plants.« less

  12. UV disinfection pilot plant study at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huffines, R.L.; Beavers, B.A.

    1993-01-01

    An ultraviolet light disinfection system pilot plant was operated at the Savannah River Site Central Shops sanitary wastewater treatment package plant July 14, 1992 through August 13, 1992. The purpose was to determine the effectiveness of ultraviolet light disinfection on the effluent from the small package-type wastewater treatment plants currently used on-site. This pilot plant consisted of a rack of UV lights suspended in a stainless steel channel through which a sidestream of effluent from the treatment plant clarifier was pumped. Fecal coliform analyses were performed on the influent to and effluent from the pilot unit to verify the disinfectionmore » process. UV disinfection was highly effective in reducing fecal coliform colonies within NPDES permit limitations even under process upset conditions. The average fecal coliform reduction exceeded 99.7% using ultraviolet light disinfection under normal operating conditions at the package treatment plants.« less

  13. 78 FR 9936 - Federal Housing Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program: Extension of Pilot Program AGENCY...: On March 31, 2011, HUD published a notice that announced HUD's FHA Home Energy Retrofit Loan Pilot Program (Retrofit Pilot Program) known as FHA PowerSaver, which is a pilot program conducted for loans...

  14. The evaluation of water hyacinth (Eichhornia crassiper) control program in Rawapening Lake, Central Java Indonesia

    NASA Astrophysics Data System (ADS)

    Hidayati, N.; Soeprobowati, T. R.; Helmi, M.

    2018-03-01

    The existence of water hyacinths and other aquatic plants have been a major concern in Rawapening Lake for many years. Nutrient input from water catchment area and fish feed residues suspected to leads eutrophication, a condition that induces uncontrolled growth of aquatic plants. In dry season, aquatic plants cover almost 70% of lake area. This problem should be handled properly due to wide range of lake function such as water resources, fish farming, power plants, flood control, irrigation and many other important things. In 2011, Rawapening Lake was appointed as pilot project of Save Indonesian Lake Movement: the Indonesian movement for lakes ecosystem conservation and rehabilitation. This project consists of 6 super priority programs and 11 priority programs. This paper will evaluate the first super priority program which aims to control water hyacinth bloom. Result show that the three indicators in water hyacinth control program was not achieved. The coverage area of Water hyacinth was not reduced, tend to increase during period 2012 to 2016. We suggesting better coordination should be performed in order to avoid policies misinterpretation and to clarify the authority from each institution. We also give a support to the establishment of lake zonation plan and keep using all the three methods of cleaning water hyacinth with a maximum population remained at 20%.

  15. A 40 MWe floating OTEC plant at Punta Tuna, Puerto Rico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dambly, B.W.

    1981-01-01

    A development project leading to a closed-cycle ocean thermal energy conversion (OTEC) pilot plant is considered. In connection with this project, a plan was submitted for design, construction, deployment, start-up, and operation of a 40 MWe floating electric generating plant at Punta Tuna, Puerto Rico. Attention is given to the OTEC concept, organizational aspects related to the project, the major problems regarding the OTEC program, and the commercialization plan. Questions of design philosophy are examined, taking into account the need for efficient heat exchangers, the minimization of water flow, the importance of achieving maximized efficiency, and requirements for environmental safety.

  16. Analysis of hydraulic tests of the Culebra and Magenta Dolomites and Dewey Lake Redbeds conducted at the Waste Isolation Pilot Plant Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beauheim, R.L.; Ruskauff, G.J.

    1998-09-01

    This report presents interpretations of hydraulic tests conducted at 15 well locations in the vicinity of the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico between 1980 and 1996. The WIPP is a US Department of Energy (DOE) facility to demonstrate safe disposal of transuranic wastes arising form the nation`s defense programs. The WIPP repository lies within bedded halite of the Salado Formation, 2,155 ft below ground surface. The tests reported herein were, with two exceptions, conducted in the Culebra Dolomite member of the Rustler Formation, which overlies the Salado Formation. The remaining tests were conducted in the Magentamore » Member of the Rustler and in the overlying formation, the Dewey Lake Redbeds. This report completes the documentation of hydraulic-test interpretations used as input to the WIPP Compliance Certification Application (US DOE, 1996).« less

  17. Technical progress in silicon sheet growth under DOE/JPL FSA program, 1975-1986

    NASA Technical Reports Server (NTRS)

    Kalejs, J. P.

    1986-01-01

    The technical progress made in the Silicon Sheet Growth Program during its 11 years was reviewed. At present, in 1986, only two of the original 9 techniques have survived to the start-up, pilot-plant stage in industry. These two techniques are the edge-defined, film-fed growth (EFG) technique that produces closed shape polygons, and the WEB dendritic technique that produces single ribbons. Both the status and future concerns of the EFG and WEB techniques were discussed.

  18. Background Underground at WIPP

    NASA Astrophysics Data System (ADS)

    Esch, Ernst-Ingo; Hime, A.; Bowles, T. J.

    2001-04-01

    Recent interest to establish a dedicated underground laboratory in the United States prompted an experimental program at to quantify the enviromental backgrounds underground at the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. An outline of this program is provided along with recent experimental data on the cosmic ray muon flux at the 650 meter level of WIPP. The implications of the cosmic ray muon and fast neutron background at WIPP will be discussed in the context of new generation, low background experiments envisioned in the future.

  19. Improvement of water treatment pilot plant with Moringa oleifera extract as flocculant agent.

    PubMed

    Beltrán-Heredia, J; Sánchez-Martín, J

    2009-05-01

    Moringa oleifera extract is a high-capacity flocculant agent for turbidity removal in surface water treatment. A complete study of a pilot-plant installation has been carried out. Because of flocculent sedimentability of treated water, a residual turbidity occured in the pilot plant (around 30 NTU), which could not be reduced just by a coagulation-flocculation-sedimentation process. Because of this limitation, the pilot plant (excluded filtration) achieved a turbidity removal up to 70%. A slow sand filter was put in as a complement to installation. A clogging process was characterized, according to Carman-Kozeny's hydraulic hypothesis. Kozeny's k parameter was found to be 4.18. Through fouling stages, this k parameter was found to be up to 6.36. The obtained data are relevant for the design of a real filter in a continuous-feeding pilot plant. Slow sand filtration is highly recommended owing to its low cost, easy-handling and low maintenance, so it is a very good complement to Moringa water treatment in developing countries.

  20. Water Treatment Pilot Plant Design Manual: Low Flow Conventional/Direct Filtration Water Treatment Plant for Drinking Water Treatment Studies

    EPA Science Inventory

    This manual highlights the project constraints and concerns, and includes detailed design calculations and system schematics. The plant is based on engineering design principles and practices, previous pilot plant design experiences, and professional experiences and may serve as ...

  1. Long-Term Instrumentation, Information, and Control Systems (II&C) Modernization Future Vision and Strategy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kenneth Thomas

    2012-02-01

    Life extension beyond 60 years for the U.S operating nuclear fleet requires that instrumentation and control (I&C) systems be upgraded to address aging and reliability concerns. It is impractical for the legacy systems based on 1970's vintage technology operate over this extended time period. Indeed, utilities have successfully engaged in such replacements when dictated by these operational concerns. However, the replacements have been approached in a like-for-like manner, meaning that they do not take advantage of the inherent capabilities of digital technology to improve business functions. And so, the improvement in I&C system performance has not translated to bottom-line performancemore » improvement for the fleet. Therefore, wide-scale modernization of the legacy I&C systems could prove to be cost-prohibitive unless the technology is implemented in a manner to enable significant business innovation as a means of off-setting the cost of upgrades. A Future Vision of a transformed nuclear plant operating model based on an integrated digital environment has been developed as part of the Advanced Instrumentation, Information, and Control (II&C) research pathway, under the Light Water Reactor (LWR) Sustainability Program. This is a research and development program sponsored by the U.S. Department of Energy (DOE), performed in close collaboration with the nuclear utility industry, to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. DOE's program focus is on longer-term and higher-risk/reward research that contributes to the national policy objectives of energy security and environmental security . The Advanced II&C research pathway is being conducted by the Idaho National Laboratory (INL). The Future Vision is based on a digital architecture that encompasses all aspects of plant operations and support, integrating plant systems, plant work processes, and plant workers in a seamless digital environment to enhance nuclear safety, increase productivity, and improve overall plant performance. The long-term goal is to transform the operating model of the nuclear power plants (NPP)s from one that is highly reliant on a large staff performing mostly manual activities to an operating model based on highly integrated technology with a smaller staff. This digital transformation is critical to addressing an array of issues facing the plants, including aging of legacy analog systems, potential shortage of technical workers, ever-increasing expectations for nuclear safety improvement, and relentless pressure to reduce cost. The Future Vision is based on research is being conducted in the following major areas of plant function: (1) Highly integrated control rooms; (2) Highly automated plant; (3) Integrated operations; (4) Human performance improvement for field workers; and (5) Outage safety and efficiency. Pilot projects will be conducted in each of these areas as the means for industry to collectively integrate these new technologies into nuclear plant work activities. The pilot projects introduce new digital technologies into the nuclear plant operating environment at host operating plants to demonstrate and validate them for production usage. In turn, the pilot project technologies serve as the stepping stones to the eventual seamless digital environment as described in the Future Vision.« less

  2. Long-Term Instrumentation, Information, and Control Systems (II&C) Modernization Future Vision and Strategy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kenneth Thomas; Bruce Hallbert

    2013-02-01

    Life extension beyond 60 years for the U.S operating nuclear fleet requires that instrumentation and control (I&C) systems be upgraded to address aging and reliability concerns. It is impractical for the legacy systems based on 1970’s vintage technology operate over this extended time period. Indeed, utilities have successfully engaged in such replacements when dictated by these operational concerns. However, the replacements have been approached in a like-for-like manner, meaning that they do not take advantage of the inherent capabilities of digital technology to improve business functions. And so, the improvement in I&C system performance has not translated to bottom-line performancemore » improvement for the fleet. Therefore, wide-scale modernization of the legacy I&C systems could prove to be cost-prohibitive unless the technology is implemented in a manner to enable significant business innovation as a means of off-setting the cost of upgrades. A Future Vision of a transformed nuclear plant operating model based on an integrated digital environment has been developed as part of the Advanced Instrumentation, Information, and Control (II&C) research pathway, under the Light Water Reactor (LWR) Sustainability Program. This is a research and development program sponsored by the U.S. Department of Energy (DOE), performed in close collaboration with the nuclear utility industry, to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. DOE’s program focus is on longer-term and higher-risk/reward research that contributes to the national policy objectives of energy security and environmental security . The Advanced II&C research pathway is being conducted by the Idaho National Laboratory (INL). The Future Vision is based on a digital architecture that encompasses all aspects of plant operations and support, integrating plant systems, plant work processes, and plant workers in a seamless digital environment to enhance nuclear safety, increase productivity, and improve overall plant performance. The long-term goal is to transform the operating model of the nuclear power plants (NPP)s from one that is highly reliant on a large staff performing mostly manual activities to an operating model based on highly integrated technology with a smaller staff. This digital transformation is critical to addressing an array of issues facing the plants, including aging of legacy analog systems, potential shortage of technical workers, ever-increasing expectations for nuclear safety improvement, and relentless pressure to reduce cost. The Future Vision is based on research is being conducted in the following major areas of plant function: 1. Highly integrated control rooms 2. Highly automated plant 3. Integrated operations 4. Human performance improvement for field workers 5. Outage safety and efficiency. Pilot projects will be conducted in each of these areas as the means for industry to collectively integrate these new technologies into nuclear plant work activities. The pilot projects introduce new digital technologies into the nuclear plant operating environment at host operating plants to demonstrate and validate them for production usage. In turn, the pilot project technologies serve as the stepping stones to the eventual seamless digital environment as described in the Future Vision.« less

  3. SOUTH ELEVATION OF HOT PILOT PLANT (CPP640) LOOKING NORTH. INL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SOUTH ELEVATION OF HOT PILOT PLANT (CPP-640) LOOKING NORTH. INL PHOTO NUMBER HD-22-3-1. Mike Crane, Photographer, 11/1998 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  4. SOXAL{trademark} pilot plant demonstration at Niagara Mohawk`s Dunkirk Station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strangway, P.K.

    This paper describes a six-month, nominal three megawatt (3 MW) pilot plant demonstration of the SOXAL{trademark} regenerative flue gas desulfurization (FGD) process at Niagara Mohawk Power Corporation`s Dunkirk, NY coal-fired power station. Using a slip-stream of flue gas from an actual coal-fired boiler, the pilot plant successfully demonstrated the absorption of sulfur dioxide and the simultaneous regeneration of sodium-based scrubbing liquor via bipolar membrane electrodialysis. Sulfur dioxide removal efficiency of greater than 98% was routinely achieved. The absorption and regeneration stages were both proven reliable and controllable. The pilot plant was successfully operated in both continuous and decoupled modes ofmore » operation, thus demonstrating the flexibility of this process.« less

  5. COMMERCIALIZATION OF AN ATMOSPHERIC IRON-BASED CDCL PROCESS FOR POWER PRODUCTION. PHASE I: TECHNOECONOMIC ANALYSIS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargas, Luis

    Coal Direct Chemical Looping (CDCL) is an advanced oxy-combustion technology that has potential to enable substantial reductions in the cost and energy penalty associated with carbon dioxide (CO2) capture from coal-fired power plants. Through collaborative efforts, the Babcock & Wilcox Power Generation Group (B&W) and The Ohio State University (OSU) developed a conceptual design for a 550 MWe (net) supercritical CDCL power plant with greater than 90% CO2 capture and compression. Process simulations were completed to enable an initial assessment of its technical performance. A cost estimate was developed following DOE’s guidelines as outlined in NETL’s report “Quality Guidelines formore » Energy System Studies: Cost Estimation Methodology for NETL Assessments of Power Plant Performance”, (2011/1455). The cost of electricity for the CDCL plant without CO2 Transportation and Storage cost resulted in $ $102.67 per MWh, which corresponds to a 26.8 % increase in cost of electricity (COE) when compared to an air-fired pulverized-coal supercritical power plant. The cost of electricity is strongly depending on the total plant cost and cost of the oxygen carrier particles. The CDCL process could capture further potential savings by increasing the performance of the particles and reducing the plant size. During the techno-economic analysis, the team identified technology and engineering gaps that need to be closed to bring the technology to commercialization. The technology gaps were focused in five critical areas: (i) moving bed reducer reactor, (ii) fluidized bed combustor, (iii) particle riser, (iv) oxygen-carrier particle properties, and (v) process operation. The key technology gaps are related to particle performance, particle manufacturing cost, and the operation of the reducer reactor. These technology gaps are to be addressed during Phase II of project. The project team is proposing additional lab testing to be completed on the particle and a 3MWth pilot facility be built to evaluate the reducer reactor performance among other aspects of the technology. A Phase II proposal was prepared and submitted to DOE. The project team proposed a three year program in Phase II. Year 1 includes lab testing and particle development work aimed at improving the chemical and mechanical properties of the oxygen carrier particle. In parallel, B&W will design the 3MWt pilot plant. Any improvements to the particle performance discovered in year 1 that would impact the design of the pilot will be incorporated into the final design. Year 2 will focus on procurement of materials and equipment, and construction of the pilot plant. Year 3 will include, commissioning, start-up, and testing in the pilot. Phase I work was successfully completed and a design and operating philosophy for a 550 MWe commercial scale coal-direct chemical looping power plant was developed. Based on the results of the techno-economic evaluation, B&W projects that the CDCL process can achieve 96.5% CO2 capture with a« less

  6. Evaluate styrene production

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hagopian, C.R.; Lewis, P.J.; McDonald, J.J.

    1983-02-01

    Improvements and innovations in styrene production since 1966 are outlined. Rigorous process models are attributed to the changes. Such models are used to evaluate the effects of changing raw material costs, utility costs, and available catalyst choices. The process model can also evaluate the best operating configuration and catalyst choice for a plant. All specified innovations are incorporated in the Mobil/Badger ethylbenzene and the Cosden/Badger styrene processes (both of which are schematicized). Badger's training programs are reviewed. Badger's Styrenics Business Team converts information into plant design basis. A reaction model with input derived from isothermal and adiabatic pilot plant unitsmore » is at the heart of complete computer simulation of ethylbenzene and styrene processes.« less

  7. ARCHITECTURAL WALL SECTIONS OF HOT PILOT PLANT (CPP640). INL DRAWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL WALL SECTIONS OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111682. ALTERNATE ID NUMBER 8952-CPP-640-A-5. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  8. MISCELLANEOUS ARCHITECTURAL DETAILS OF HOT PILOT PLANT (CPP640). INL DRAWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MISCELLANEOUS ARCHITECTURAL DETAILS OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-640-00-279-111684. ALTERNATE ID NUMBER 8952-CPP-640-A-7. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  9. Evaluation of Solid Sorbents as a Retrofit Technology for CO 2 Capture

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sjostrom, Sharon

    2016-06-02

    ADA completed a DOE-sponsored program titled Evaluation of Solid Sorbents as a Retrofit Technology for CO 2 Capture under program DE-FE0004343. During this program, sorbents were analyzed for use in a post-combustion CO 2 capture process. A supported amine sorbent was selected based upon superior performance to adsorb a greater amount of CO 2 than the activated carbon sorbents tested. When the most ideal sorbent at the time was selected, it was characterized and used to create a preliminary techno-economic analysis (TEA). A preliminary 550 MW coal-fired power plant using Illinois #6 bituminous coal was designed with a solid sorbentmore » CO 2 capture system using the selected supported amine sorbent to both facilitate the TEA and to create the necessary framework to scale down the design to a 1 MWe equivalent slipstream pilot facility. The preliminary techno-economic analysis showed promising results and potential for improved performance for CO 2 capture compared to conventional MEA systems. As a result, a 1 MWe equivalent solid sorbent system was designed, constructed, and then installed at a coal-fired power plant in Alabama. The pilot was designed to capture 90% of the CO 2 from the incoming flue gas at 1 MWe net electrical generating equivalent. Testing was not possible at the design conditions due to changes in sorbent handling characteristics at post-regenerator temperatures that were not properly incorporated into the pilot design. Thus, severe pluggage occurred at nominally 60% of the design sorbent circulation rate with heated sorbent, although no handling issues were noted when the system was operated prior to bringing the regenerator to operating temperature. Testing within the constraints of the pilot plant resulted in 90% capture of the incoming CO 2 at a flow rate equivalent of 0.2 to 0.25 MWe net electrical generating equivalent. The reduction in equivalent flow rate at 90% capture was primarily the result of sorbent circulation limitations at operating temperatures combined with pre-loading of the sorbent with CO 2 prior to entering the adsorber. Specifically, CO 2-rich gas was utilized to convey sorbent from the regenerator to the adsorber. This gas was nominally 45°C below the regenerator temperature during testing. ADA’s post-combustion capture system with modifications to overcome pilot constraints, in conjunction with incorporating a sorbent with CO 2 working capacity of 15 g CO 2/100 g sorbent and a contact time of 10 to 15 minutes or less with flue gas could provide significant cost and performance benefits when compared to an MEA system.« less

  10. 78 FR 29117 - After Final Consideration Pilot Program 2.0

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ...] After Final Consideration Pilot Program 2.0 AGENCY: United States Patent and Trademark Office, Commerce... Final Consideration Pilot Program (AFCP) to create the After Final Consideration Pilot Program 2.0 (AFCP... without modifications) depending on feedback from the participants and the effectiveness of the pilot...

  11. Coupling solar photo-Fenton and biotreatment at industrial scale: main results of a demonstration plant.

    PubMed

    Malato, Sixto; Blanco, Julián; Maldonado, Manuel I; Oller, Isabel; Gernjak, Wolfgang; Pérez-Estrada, Leonidas

    2007-07-31

    This paper reports on the combined solar photo-Fenton/biological treatment of an industrial effluent (initial total organic carbon, TOC, around 500mgL(-1)) containing a non-biodegradable organic substance (alpha-methylphenylglycine at 500mgL(-1)), focusing on pilot plant tests performed for design of an industrial plant, the design itself and the plant layout. Pilot plant tests have demonstrated that biodegradability enhancement is closely related to disappearance of the parent compound, for which a certain illumination time and hydrogen peroxide consumption are required, working at pH 2.8 and adding Fe(2+)=20mgL(-1). Based on pilot plant results, an industrial plant with 100m(2) of CPC collectors for a 250L/h treatment capacity has been designed. The solar system discharges the wastewater (WW) pre-treated by photo-Fenton into a biotreatment based on an immobilized biomass reactor. First, results of the industrial plant are also presented, demonstrating that it is able to treat up to 500Lh(-1) at an average solar ultraviolet radiation of 22.9Wm(-2), under the same conditions (pH, hydrogen peroxide consumption) tested in the pilot plant.

  12. ARCHITECTURAL FLOOR PLAN OF OPERATING AREA HOT PILOT PLANT (CPP640). ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL FLOOR PLAN OF OPERATING AREA HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111678. ALTERNATE ID NUMBER 8952-CPP-640-A-1. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  13. ARCHITECTURAL DOOR DETAILS AND SCHEDULE OF HOT PILOT PLANT (CPP640). ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL DOOR DETAILS AND SCHEDULE OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-640-00-279-111683. ALTERNATE ID NUMBER 8952-CPP-640-A-6. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  14. ARCHITECTURAL SECTIONS A, B, C, D, OF HOT PILOT PLANT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL SECTIONS A, B, C, D, OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111681. ALTERNATE ID NUMBER 8952-CPP-640-A-5. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  15. Electron beam treatment of textile dyeing wastewater: operation of pilot plant and industrial plant construction.

    PubMed

    Han, B; Kim, J; Kim, Y; Choi, J S; Makarov, I E; Ponomarev, A V

    2005-01-01

    A pilot plant for treating 1000 m3/day of dyeing wastewater with e-beam has been constructed and operated since 1998 in Daegu, Korea together with the biological treatment facility. The wastewater from various stages of the existing purification process has been treated with an electron beam in this plant, and it gave rise to elaborating the optimal technology of the electron beam treatment of wastewater with increased reliability for instant changes in the composition of wastewater. Installation of the e-beam pilot plant resulted in decolorizing and destructive oxidation of organic impurities in wastewater, appreciable reduction of chemical reagent consumption, in reduction of the treatment time, and in increase in the flow rate limit of existing facilities by 30-40%. Industrial plant for treating 10,000 m3/day each, based upon the pilot experimental result, is under construction and will be finished by 2005. This project is supported by the International Atomic Energy Agency (IAEA) and Korean Government.

  16. 76 FR 79243 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-21

    ... Pilot Program will allow for further analysis of the Pilot Program and a determination of how the Pilot Program should be structured in the future. During this extension of the Penny Pilot Program, CBOE... to the Pilot Program (i.e. December) would not be used for purposes of the six-month analysis. Thus...

  17. Homer City Multistream Coal Cleaning Demonstration: A progress report. Report for January 1979-July 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carey, D.W.; Higgins, S.T.; Slowik, A.A.

    1984-08-01

    The report gives an overview of ongoing testing and evaluation of the Homer City Coal Cleaning Plant, built to enable the Homer City Power Complex to meet sulfur dioxide (SO2) emission levels mandated by the State of Pennsylvania and the U.S. Government. The plant was constructed as a result of an extensive comparative evaluation of flue gas desulfurization (FGD) and physical coal cleaning. The Homer City System, the Multistream Coal Cleaning System (MCCS), was chosen as an economical alternative to FGD. The plant contains circuits for cleaning coarse, medium, and fine coals and for recovering fine and very fine coals.more » The dominant type of cleaning equipment used in the plant is the dense medium cyclone. The original '93 plant' configuration was never able to clean coal to the conditions specified in the plant design. An extensive test and evaluation program was begun to identify and correct the causes of plant operating problems. After extensive pilot plant equipment tests and engineering studies were completed, recommendations were made for plant modifications necessary to correct the design and operating deficiencies of the plant. Extensive modifications were made to one of two parallel processing trains in the plant (the 'B' circuits), and a test program was initiated to evaluate these corrective measures. The modified 'B' circuits have not yet met design conditions.« less

  18. The 10 MWe Solar Thermal Central Receiver Pilot Plant: Solar facilities design integration. Pilot-plant station manual (RADL Item 2-1). Volume 1: System description

    NASA Astrophysics Data System (ADS)

    1982-09-01

    The complete Barstow Solar Pilot Plant is described. The plant requirements and general description are presented, the mechanical, electric power, and control and instrumentation systems as well as civil engineering and structural aspects and the station buildings are described. Included in the mechanical systems are the heliostats, receiver, thermal storage system, beam characterization system, steam, water, nitrogen, and compressed air systems, chemical feed system, fire protection system, drains, sumps and the waste disposal systems, and heating, ventilating, and air conditioning systems.

  19. 48 CFR 212.7102 - Pilot program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Pilot program. 212.7102... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Acquisition of Military-Purpose Nondevelopmental Items 212.7102 Pilot program. ...

  20. Defense Research: Improved Management of DOD’s Technical Corrosion Collaboration Program Needed

    DTIC Science & Technology

    2014-05-01

    Education and Research on Corrosion and Material Performance TCC Technical Corrosion Collaboration UCC University Corrosion Collaboration This is...is the successor to the University Corrosion Collaboration ( UCC ) pilot program, established in 2008. The TCC program builds on efforts of the UCC ...going from a pilot to a full program. They indicated that the UCC pilot program naturally evolved into the TCC pilot program in 2011, and the pilot

  1. UNIVERSITY OF WASHINGTON ELECTROSTATIC SCRUBBER TESTS AT A COAL-FIRED POWER PLANT

    EPA Science Inventory

    The report gives results of tests of a 1700 cu m/hr University of Washington Electrostatic Spray Scrubber pilot plant on a coal-fired boiler to demonstrate its effectiveness for controlling fine particle emissions. The multiple-pass, portable pilot plant combines oppositely charg...

  2. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) OVERALL VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) OVERALL VIEW LOOKING SOUTHEAST; CONSTRUCTION 34 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-3034. Holmes, Photographer, 6/23/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  3. NORTH ELEVATION OF HOT PILOT PLANT (CPP640) LOOKING SOUTH AFTER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    NORTH ELEVATION OF HOT PILOT PLANT (CPP-640) LOOKING SOUTH AFTER REMOTE ANALYTICAL FACILITY (CPP-627) WAS REMOVED. PHOTO NUMBER HD-54-33-2. Mike Crane, Photographer, 7/2006 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  4. ARCHITECTURAL ROOF PLAN AND WESTSOUTHEAST ELEVATIONS OF HOT PILOT PLANT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL ROOF PLAN AND WEST-SOUTHEAST ELEVATIONS OF HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111680. ALTERNATE ID NUMBER 8952-CPP-640-A-3. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  5. [Pilot plant for microbiological synthesis. Engineer and technological aspects].

    PubMed

    Lukanin, A V

    2007-01-01

    A biotechnological pilot plant (National Research Centre of Antibiotics) and its technical potentialities in production of various biosynthetic products are described. Some engineer and technological aspects of the fermentation equipment and particularly sterilization of the media and apparatus, fermentation broth aeration under sterile conditions and control of biosynthesis technological parameters (t degrees, pO2, P, pH, foaming, etc.) are considered. The pilot plant is designed for fermentation processes under aseptic conditions with the use practically of any object, from bacteria to tissue cultures.

  6. 78 FR 23941 - Pilot Program for Early Feasibility Study Investigational Device Exemption Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ...] Pilot Program for Early Feasibility Study Investigational Device Exemption Applications; Extending the... 13343), FDA terminated the acceptance of applications into the program and extended the pilot program for the nine accepted sponsors until May 8, 2013. The pilot program will be further extended for the...

  7. 14 CFR 91.1097 - Pilot and flight attendant crewmember training programs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Pilot and flight attendant crewmember... RULES Fractional Ownership Operations Program Management § 91.1097 Pilot and flight attendant crewmember training programs. (a) Each program manager must establish and maintain an approved pilot training program...

  8. 14 CFR 91.1097 - Pilot and flight attendant crewmember training programs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Pilot and flight attendant crewmember... RULES Fractional Ownership Operations Program Management § 91.1097 Pilot and flight attendant crewmember training programs. (a) Each program manager must establish and maintain an approved pilot training program...

  9. 9 CFR 149.9 - Pilot program sites.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Pilot program sites. 149.9 Section 149... LIVESTOCK IMPROVEMENT VOLUNTARY TRICHINAE CERTIFICATION PROGRAM § 149.9 Pilot program sites. Pork production sites participating in an APHIS-approved trichinae pilot program at the time of implementation of the...

  10. 9 CFR 149.9 - Pilot program sites.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Pilot program sites. 149.9 Section 149... LIVESTOCK IMPROVEMENT VOLUNTARY TRICHINAE CERTIFICATION PROGRAM § 149.9 Pilot program sites. Pork production sites participating in an APHIS-approved trichinae pilot program at the time of implementation of the...

  11. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING NORTHEAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHEAST SHOWING OVERALL BLOCK EXTERIOR WALLS; CONSTRUCTION 65 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-4976. Holmes, Photographer, 9/26/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  12. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING EAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING EAST SHOWING EXCAVATION AND FORMING; CONSTRUCTION 6 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-59-4935. J. Anderson, Photographer, 9/21/1959 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  13. INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR DEPICTING DETAIL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR DEPICTING DETAIL OF SHIELDED CAVE (CPP-640) LOOKING SOUTHWEST. PHOTO TAKEN FROM NORTH. INL PHOTO NUMBER HD-54-40-2. Mike Crane, Photographer, 7/2006 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  14. INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR WITH SOUTH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR PHOTO OF HOT PILOT PLANT SECOND FLOOR WITH SOUTH SECTION OF SHIELDED CAVE IN FOREGROUND (CPP-640) LOOKING NORTHWEST. INL PHOTO NUMBER HD-54-40-1. Mike Crane, Photographer, 7/2006 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  15. Vitrification of plutonium at Rocky Flats the argument for a pilot plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moore, L.

    1996-05-01

    Current plans for stabilizing and storing the plutonium at Rocky Flats Plant fail to put the material in a form suitable for disposition and resistant to proliferation. Vitrification should be considered as an alternate technology. The vitrification should begin with a small-scale pilot plant.

  16. Microchannel Reactor System for Catalytic Hydrogenation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adeniyi Lawal; Woo Lee; Ron Besser

    2010-12-22

    We successfully demonstrated a novel process intensification concept enabled by the development of microchannel reactors, for energy efficient catalytic hydrogenation reactions at moderate temperature, and pressure, and low solvent levels. We designed, fabricated, evaluated, and optimized a laboratory-scale microchannel reactor system for hydrogenation of onitroanisole and a proprietary BMS molecule. In the second phase of the program, as a prelude to full-scale commercialization, we designed and developed a fully-automated skid-mounted multichannel microreactor pilot plant system for multiphase reactions. The system is capable of processing 1 – 10 kg/h of liquid substrate, and an industrially relevant immiscible liquid-liquid was successfully demonstratedmore » on the system. Our microreactor-based pilot plant is one-of-akind. We anticipate that this process intensification concept, if successfully demonstrated, will provide a paradigm-changing basis for replacing existing energy inefficient, cost ineffective, environmentally detrimental slurry semi-batch reactor-based manufacturing practiced in the pharmaceutical and fine chemicals industries.« less

  17. Fate of NDMA precursors through an MBR-NF pilot plant for urban wastewater reclamation and the effect of changing aeration conditions.

    PubMed

    Mamo, Julian; Insa, Sara; Monclús, Hèctor; Rodríguez-Roda, Ignasi; Comas, Joaquim; Barceló, Damià; Farré, Maria José

    2016-10-01

    The removal of N-nitrosodimethylamine (NDMA) formation potential through a membrane bioreactor (MBR) coupled to a nanofiltration (NF) pilot plant that treats urban wastewater is investigated. The results are compared to the fate of the individual NDMA precursors detected: azithromycin, citalopram, erythromycin, clarithromycin, ranitidine, venlafaxine and its metabolite o-desmethylvenlafaxine. Specifically, the effect of dissolved oxygen in the aerobic chamber of the MBR pilot plant on the removal of NDMA formation potential (FP) and individual precursors is studied. During normal aerobic operation, implying a fully nitrifying system, the MBR was able to reduce NDMA precursors above 94%, however this removal percentage was reduced to values as low as 72% when changing the conditions to minimize nitrification. Removal decreased also for azithromycin (68-59%), citalopram (31-17%), venlafaxine (35-15%) and erythromycin (61-16%) on average during nitrifying versus non-nitrifying conditions. The removal of clarithromycin, o-desmethylvenlafaxine and ranitidine could not be correlated with the nitrification inhibition, as it varied greatly during the experiment time. The MBR pilot plant is coupled to a nanofiltration (NF) system and the results on the rejection of both, NDMA FP and individual precursors, through this system was above 90%. Finally, results obtained for the MBR pilot plant are compared to the percentage of removal by a conventional full scale biological wastewater treatment plant (WWTP) fed with the same influent. During aerobic operation, the removal of NDMA FP by the MBR pilot plant was similar to the full scale WWTP. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. 48 CFR 212.7002 - Pilot program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Pilot program. 212.7002... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002 Pilot program. ...

  19. 48 CFR 212.7002 - Pilot program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Pilot program. 212.7002... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002 Pilot program. ...

  20. 75 FR 80561 - Community Express Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... SMALL BUSINESS ADMINISTRATION Community Express Pilot Program AGENCY: U.S. Small Business Administration (SBA). ACTION: Notice of short-term extension and termination of the Community Express Pilot Program. SUMMARY: This notice announces the termination of the Community Express Pilot Program following a...

  1. 77 FR 59911 - Request To Make Special Program for the Law School Clinic Certification Patent Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ...] Request To Make Special Program for the Law School Clinic Certification Patent Pilot Program AGENCY... and Trademark Office (USPTO) is implementing a pilot program in which a law school clinic participating in the USPTO Law School Clinic Certification Pilot Program may file an application for a pro bono...

  2. 27 CFR 25.277 - Discontinuance of operations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... BUREAU, DEPARTMENT OF THE TREASURY LIQUORS BEER Pilot Brewing Plants § 25.277 Discontinuance of operations. When operations of a pilot brewing plant are to be discontinued, the operator shall notify the...

  3. 27 CFR 25.277 - Discontinuance of operations.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... BUREAU, DEPARTMENT OF THE TREASURY LIQUORS BEER Pilot Brewing Plants § 25.277 Discontinuance of operations. When operations of a pilot brewing plant are to be discontinued, the operator shall notify the...

  4. IARC - Illinois Accelerator Research Center | Pilot Program

    Science.gov Websites

    Toggle navigation Pilot Program Agenda Directions Registration Illinois Accelerator Research Center National Laboratory present Accelerator Stewardship Test Facility Pilot Program Use accelerator technology , energy and environment. With this pilot program, the DOE Office of Science National Laboratories are

  5. 75 FR 473 - Community Express Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... SMALL BUSINESS ADMINISTRATION Community Express Pilot Program AGENCY: U.S. Small Business Administration (SBA). ACTION: Notice of extension of the Community Express Pilot Program. SUMMARY: This notice extends the Community Express Pilot Program in its current form through December 31, 2010. Based upon the...

  6. Principles of an enhanced MBR-process with mechanical cleaning.

    PubMed

    Rosenberger, S; Helmus, F P; Krause, S; Bareth, A; Meyer-Blumenroth, U

    2011-01-01

    Up to date, different physical and chemical cleaning protocols are necessary to limit membrane fouling in membrane bioreactors. This paper deals with a mechanical cleaning process, which aims at the avoidance of hypochlorite and other critical chemicals in MBR with submerged flat sheet modules. The process basically consists of the addition of plastic particles into the loop circulation within submerged membrane modules. Investigations of two pilot plants are presented: Pilot plant 1 is equipped with a 10 m(2) membrane module and operated with a translucent model suspension; pilot plant 2 is equipped with four 50 m(2) membrane modules and operated with pretreated sewage. Results of pilot plant 1 show that the establishment of a fluidised bed with regular particle distribution is possible for a variety of particles. Particles with maximum densities of 1.05 g/cm(3) and between 3 and 5 mm diameter form a stable fluidised bed almost regardless of activated sludge concentration, viscosity and reactor geometry. Particles with densities between 1.05 g/cm(3) and 1.2 g/cm(3) form a stable fluidised bed, if the velocity at the reactor bottom is sufficiently high. Activities within pilot plant 2 focused on plant optimisation and the development of an adequate particle retention system.

  7. Waste Isolation Pilot Plant Materials Interface Interactions Test: Papers presented at the Commission of European Communities workshop on in situ testing of radioactive waste forms and engineered barriers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Molecke, M.A.; Sorensen, N.R.; Wicks, G.G.

    The three papers in this report were presented at the second international workshop to feature the Waste Isolation Pilot Plant (WIPP) Materials Interface Interactions Test (MIIT). This Workshop on In Situ Tests on Radioactive Waste Forms and Engineered Barriers was held in Corsendonk, Belgium, on October 13--16, 1992, and was sponsored by the Commission of the European Communities (CEC). The Studiecentrum voor Kernenergie/Centre D`Energie Nucleaire (SCK/CEN, Belgium), and the US Department of Energy (via Savannah River) also cosponsored this workshop. Workshop participants from Belgium, France, Germany, Sweden, and the United States gathered to discuss the status, results and overviews ofmore » the MIIT program. Nine of the twenty-five total workshop papers were presented on the status and results from the WIPP MIIT program after the five-year in situ conclusion of the program. The total number of published MIIT papers is now up to almost forty. Posttest laboratory analyses are still in progress at multiple participating laboratories. The first MIIT paper in this document, by Wicks and Molecke, provides an overview of the entire test program and focuses on the waste form samples. The second paper, by Molecke and Wicks, concentrates on technical details and repository relevant observations on the in situ conduct, sampling, and termination operations of the MIIT. The third paper, by Sorensen and Molecke, presents and summarizes the available laboratory, posttest corrosion data and results for all of the candidate waste container or overpack metal specimens included in the MIIT program.« less

  8. 78 FR 77534 - Self-Regulatory Organizations; C2 Options Exchange, Incorporated; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... further analysis of the Pilot Program and a determination of how the Program shall be structured in the... Program will allow for further analysis of the Pilot Program and a determination of how the Pilot Program should be structured in the future. During this extension of the Pilot Program, C2 proposes that it may...

  9. 77 FR 18793 - Spectrum Sharing Innovation Test-Bed Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    .... 120322212-2212-01] Spectrum Sharing Innovation Test-Bed Pilot Program AGENCY: National Telecommunications... Innovation Test-Bed pilot program to assess whether devices employing Dynamic Spectrum Access techniques can... Spectrum Sharing Innovation Test-Bed (Test-Bed) pilot program to examine the feasibility of increased...

  10. This photo shows a head-on view of NASA's SR-71B on the ramp at the Air Force's Plant 42 in Palmdale, California, shortly before delivery to DFRC

    NASA Image and Video Library

    1991-07-24

    This photo shows a head-on view of NASA's SR-71B, used for pilot proficiency and training, on the ramp at the Air Force's Plant 42 in Palmdale, California, shortly before delivery to the Ames-Dryden Flight Research Facility (later, Dryden Flight Research Center) at Edwards, California. NASA operated two of these unique aircraft, an SR-71A, for high-speed, high altitude research, and this SR- 71B pilot trainer for most of the decade of the 1990s. The "B" model is special because of its raised rear cockpit, which provided a second pilot position so a trainer and an experienced pilot could both see what was going on during flights. The SR-71 was designed and built by the Lockheed Skunk Works, now the Lockheed Martin Skunk Works. Studies have shown that less than 20 percent of the total thrust used to fly at Mach 3 is produced by the basic engine itself. The balance of the total thrust is produced by the unique design of the engine inlet and "moveable spike" system at the front of the engine nacelles, and by the ejector nozzles at the exhaust which burn air compressed in the engine bypass system. Data from the SR-71 high speed research program will be used to aid designers of future supersonic/hypersonic aircraft and propulsion systems, including a high speed civil transport.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rashdan, Ahmad Al; Oxstrand, Johanna; Agarwal, Vivek

    As part of the ongoing efforts at the U.S. Department of Energy’s Light Water Reactor Sustainability Program, Idaho National Laboratory is conducting several pilot projects in collaboration with the nuclear industry to improve the reliability, safety, and economics of the nuclear power industry, especially as the nuclear power plants extend their operating licenses to 80 years. One of these pilot projects is the automated work package (AWP) pilot project. An AWP is an electronic intelligent and interactive work package. It uses plant condition, resources status, and user progress to adaptively drive the work process in a manner that increases efficiencymore » while reducing human error. To achieve this mission, the AWP acquires information from various systems of a nuclear power plant’s and incorporates several advanced instrumentation and control technologies along with modern human factors techniques. With the current rapid technological advancement, it is possible to envision several available or soon-to-be-available capabilities that can play a significant role in improving the work package process. As a pilot project, the AWP project develops a prototype of an expanding set of capabilities and evaluates them in an industrial environment. While some of the proposed capabilities are based on using technological advances in other applications, others are conceptual; thus, require significant research and development to be applicable in an AWP. The scope of this paper is to introduce a set of envisioned capabilities, their need for the industry, and the industry difficulties they resolve.« less

  12. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING NORTHEAST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHEAST SHOWING DECK FORMING FOR SOUTH SECTION OF OPERATING CORRIDOR; CONSTRUCTION 44 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-3624. Holmes, Photographer, 7/25/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  13. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP640) LOOKING NORTHWEST, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CPP-640) LOOKING NORTHWEST, SHOWING FORMING FOR NORTH WALLS OF CELLS 1, 4 AND 5; CONSTRUCTION 21 PERCENT COMPLETE. INL PHOTO NUMBER NRTS-60-1874. Holmes, Photographer, 4/21/1960 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  14. AMMONIA ABSORPTION/AMMONIUM BISULFATE REGENERATION PILOT PLANT FOR FLUE GAS DESULFURIZATION

    EPA Science Inventory

    The report gives results of a pilot-plant study of the ammonia absorption/ammonium bisulfate regeneration process for removing SO2 from the stack gas of coal-fired power plants. Data were developed on the effects of such operating variable in the absorption of SO2 by ammoniacal l...

  15. Overall view of administration area with building 11110 in background, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overall view of administration area with building 11110 in background, looking east from facility gate. - Naval Ordnance Test Station Inyokern, China Lake Pilot Plant, Pilot Plant Road, China Lake, Kern County, CA

  16. 27 CFR 25.273 - Action on application.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF THE TREASURY LIQUORS BEER Pilot Brewing Plants § 25.273 Action on application. If the appropriate TTB officer approves the application for a pilot brewing plant, he or she will note approval on...

  17. 27 CFR 25.273 - Action on application.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF THE TREASURY LIQUORS BEER Pilot Brewing Plants § 25.273 Action on application. If the appropriate TTB officer approves the application for a pilot brewing plant, he or she will note approval on...

  18. The pilot plant for electron beam food processing

    NASA Astrophysics Data System (ADS)

    Migdal, W.; Walis, L.; Chmielewski, A. G.

    1993-07-01

    In the frames of the national programme on the application of irradiation for food preservation and hygienization an experimental plant for electron beam processing has been established in INCT. The pilot plant has been constructed inside an old fort what decreases significantly the cost of the investment. The pilot plant is equipped with a small research accelerator Pilot (10 MeV, 1 kW) and an industrial unit Elektronika (10 MeV, 10 kW). This allows both laboratory and full technological scale testing of the elaborated process to be conducted. The industrial unit is being equipped with e-/X conversion target, for high density products irradiation. On the basis of the research there were performed at different scientific institutions in Poland, health authorities have issued permissions for permanent treatment of spices, garlic, onions and temporary permissions for mushrooms, and potatoes. Dosimetric methods have been elaborated for the routine use at the plant. In the INCT laboratory methods for the control of e-/X treated food have been established.

  19. 12 CFR 703.19 - Investment pilot program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Investment pilot program. 703.19 Section 703.19 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS INVESTMENT AND DEPOSIT ACTIVITIES § 703.19 Investment pilot program. (a) Under the investment pilot program, NCUA...

  20. 12 CFR 703.19 - Investment pilot program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Investment pilot program. 703.19 Section 703.19 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS INVESTMENT AND DEPOSIT ACTIVITIES § 703.19 Investment pilot program. (a) Under the investment pilot program, NCUA...

  1. 77 FR 67433 - Community Advantage Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... comments. SUMMARY: The Community Advantage (``CA'') Pilot Program is a pilot program to increase SBA... small businesses and entrepreneurs in underserved markets, SBA is issuing this Notice to extend the term... Pilot Program was introduced to increase the number of SBA-guaranteed loans made to small businesses in...

  2. 78 FR 60169 - Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... 9000-AM56 Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee... program enhancing whistleblower protections for contractor employees. DATES: Effective: September 30, 2013... contractor employees at FAR subpart 3.9. The pilot program is mandated by section 828, entitled ``Pilot...

  3. 78 FR 77526 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... analysis of the Pilot Program and a determination of how the Program shall be structured in the future. In.... CBOE believes that extending the Pilot Program will allow for further analysis of the Pilot Program and a determination of how the Pilot Program should be structured in the future. During this extension...

  4. Methodological approaches to conducting pilot and proof tests on reverse-osmosis systems: Results of comparative studies

    NASA Astrophysics Data System (ADS)

    Panteleev, A. A.; Bobinkin, V. V.; Larionov, S. Yu.; Ryabchikov, B. E.; Smirnov, V. B.; Shapovalov, D. A.

    2017-10-01

    When designing large-scale water-treatment plants based on reverse-osmosis systems, it is proposed to conduct experimental-industrial or pilot tests for validated simulation of the operation of the equipment. It is shown that such tests allow establishing efficient operating conditions and characteristics of the plant under design. It is proposed to conduct pilot tests of the reverse-osmosis systems on pilot membrane plants (PMPs) and test membrane plants (TMPs). The results of a comparative experimental study of pilot and test membrane plants are exemplified by simulating the operating parameters of the membrane elements of an industrial plant. It is concluded that the reliability of the data obtained on the TMP may not be sufficient to design industrial water-treatment plants, while the PMPs are capable of providing reliable data that can be used for full-scale simulation of the operation of industrial reverse-osmosis systems. The test membrane plants allow simulation of the operating conditions of individual industrial plant systems; therefore, potential areas of their application are shown. A method for numerical calculation and experimental determination of the true selectivity and the salt passage are proposed. An expression has been derived that describes the functional dependence between the observed and true salt passage. The results of the experiments conducted on a test membrane plant to determine the true value of the salt passage of a reverse-osmosis membrane are exemplified by magnesium sulfate solution at different initial operating parameters. It is shown that the initial content of a particular solution component has a significant effect on the change in the true salt passage of the membrane.

  5. Pilot Programs in Vocational Agriculture. Agribusiness Programs for People; Final Report of Wisconsin's 5 Years of Pilot Programs in Agriculture.

    ERIC Educational Resources Information Center

    Thompson, John F.

    The committee for Vocational Agriculture Pilot Programs in Wisconsin was appointed in 1967; this report analyzes the impact of five years of pilot programs on Wisconsin's vocational agriculture as a whole. During this period, the committee granted funding to 34 vocational agriculture departments in the State. A wide variety of programs were…

  6. Pressurized fluidized bed combustion of coal for electric power generation the AEP approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Markowsky J.J.; Wickstrom, B.

    1982-08-01

    American Electric Power (AEP), STAL-LAVAL Turbine A.B. (SL), and Deutsche Babcock Anlagen AG (DBA) are working on a program estimated to cost $250 million that will lead toward the construction of a large (170,000 KW) commercial demonstration of an advanced electric power plant incorporating Pressurized Fluidized Bed Combustion (PFBC) of coal. A pilot plant test program carried out during 1977-1980 verified combustor performance and demonstrated long gas turbine blade life. Parallel efforts during this period involved the design of the 170,000 kW Commercial Demonstration Plant (CDP) and a 500,000 kW Commercial Plant which essentially consists of two CDP combustors-gas turbinemore » modules and a larger capacity steam cycle. These efforts showed considerable economic advantages of PFBC-combined cycle power generation over other alternative technologies. A 15,000 KW (thermal) component test facility (CTF) is presently under construction in Sweden. Extensive testing is scheduled to begin in early 1982. Upon successful completion of these tests, AEP intends to start construction of the CDP in 1983; the plant is expected to supply power to the AEP network by 1986.« less

  7. 38 CFR 3.161 - Expedited Claims Adjudication Initiative-Pilot Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Adjudication Initiative-Pilot Program. 3.161 Section 3.161 Pensions, Bonuses, and Veterans' Relief DEPARTMENT... Claims § 3.161 Expedited Claims Adjudication Initiative—Pilot Program. Rules pertaining to the Expedited Claims Adjudication Initiative Pilot Program are set forth in part 20, subpart P, of this chapter...

  8. 77 FR 49782 - Extension of the Application Deadline for Humanitarian Awards Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ...] Extension of the Application Deadline for Humanitarian Awards Pilot Program AGENCY: United States Patent and... Trademark Office (USPTO) announced the Humanitarian Awards Pilot Program, which recognizes patent holders... extending the deadline for applications to the Humanitarian Awards Pilot Program by two months until October...

  9. 75 FR 39091 - Airport Privatization Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... Privatization Pilot Program AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of Receipt and... application for participation in the airport privatization pilot program received under 49 U.S.C. 47134. The... application to the FAA for exemption under the pilot program. 49 U.S.C. 47134 establishes an airport...

  10. Select Generic Dry-Storage Pilot Plant Design for Safeguards and Security by Design (SSBD) per Used Fuel Campaign

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Demuth, Scott Francis; Sprinkle, James K.

    As preparation to the year-end deliverable (Provide SSBD Best Practices for Generic Dry-Storage Pilot Scale Plant) for the Work Package (FT-15LA040501–Safeguards and Security by Design for Extended Dry Storage), the initial step was to select a generic dry-storage pilot plant design for SSBD. To be consistent with other DOE-NE Fuel Cycle Research and Development (FCR&D) activities, the Used Fuel Campaign was engaged for the selection of a design for this deliverable. For the work Package FT-15LA040501–“Safeguards and Security by Design for Extended Dry Storage”, SSBD will be initiated for the Generic Dry-Storage Pilot Scale Plant described by the layout ofmore » Reference 2. SSBD will consider aspects of the design that are impacted by domestic material control and accounting (MC&A), domestic security, and international safeguards.« less

  11. Sustainable reduction of bioreactor contamination in an industrial fermentation pilot plant.

    PubMed

    Junker, Beth; Lester, Michael; Leporati, James; Schmitt, John; Kovatch, Michael; Borysewicz, Stan; Maciejak, Waldemar; Seeley, Anna; Hesse, Michelle; Connors, Neal; Brix, Thomas; Creveling, Eric; Salmon, Peter

    2006-10-01

    Facility experience primarily in drug-oriented fermentation equipment (producing small molecules such as secondary metabolites, bioconversions, and enzymes) and, to a lesser extent, in biologics-oriented fermentation equipment (producing large molecules such as recombinant proteins and microbial vaccines) in an industrial fermentation pilot plant over the past 15 years is described. Potential approaches for equipment design and maintenance, operational procedures, validation/verification testing, medium selection, culture purity/sterility analysis, and contamination investigation are presented, and those approaches implemented are identified. Failure data collected for pilot plant operation for nearly 15 years are presented and best practices for documentation and tracking are outlined. This analysis does not exhaustively discuss available design, operational and procedural options; rather it selectively presents what has been determined to be beneficial in an industrial pilot plant setting. Literature references have been incorporated to provide background and context where appropriate.

  12. 76 FR 17936 - Federal Housing Administration (FHA): Notice of FHA PowerSaver Home Energy Retrofit Loan Pilot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... Housing Administration (FHA): Notice of FHA PowerSaver Home Energy Retrofit Loan Pilot Program AGENCY...: Notice. SUMMARY: This notice announces HUD's FHA Home Energy Retrofit Loan Pilot Program (Retrofit Pilot... to conduct an Energy Efficient Mortgage Innovation pilot program targeted to the single family...

  13. HANFORD MEDIUM-LOW CURIE WASTE PRETREATMENT ALTERNATIVES PROJECT FRACTIONAL CRYSTALLIZATION PILOT SCALE TESTING FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HERTING DL

    2008-09-16

    The Fractional Crystallization Pilot Plant was designed and constructed to demonstrate that fractional crystallization is a viable way to separate the high-level and low-activity radioactive waste streams from retrieved Hanford single-shell tank saltcake. The focus of this report is to review the design, construction, and testing details of the fractional crystallization pilot plant not previously disseminated.

  14. Output-Feedback Model Predictive Control of a Pasteurization Pilot Plant based on an LPV model

    NASA Astrophysics Data System (ADS)

    Karimi Pour, Fatemeh; Ocampo-Martinez, Carlos; Puig, Vicenç

    2017-01-01

    This paper presents a model predictive control (MPC) of a pasteurization pilot plant based on an LPV model. Since not all the states are measured, an observer is also designed, which allows implementing an output-feedback MPC scheme. However, the model of the plant is not completely observable when augmented with the disturbance models. In order to solve this problem, the following strategies are used: (i) the whole system is decoupled into two subsystems, (ii) an inner state-feedback controller is implemented into the MPC control scheme. A real-time example based on the pasteurization pilot plant is simulated as a case study for testing the behavior of the approaches.

  15. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... SMALL BUSINESS ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business... location, date, time, and agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in... Plan Pilot Program meeting will be held on November 16, 2010 from approximately 9 a.m. to 12 p.m...

  16. 48 CFR 1819.7208 - Award Fee Pilot Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Award Fee Pilot Program... Pilot Program. (a) Mentors will be eligible to earn a separate award fee associated with the provision... related to the mentor-protégé relationship. (d) The Award Fee Pilot Program is an addition to the credit...

  17. 76 FR 50715 - Briefing on Partner Vetting System Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... Development Briefing on Partner Vetting System Pilot Program AGENCY: U.S. Department of State and U.S. Agency... briefing on the Partner Vetting System (PVS) pilot program. The objective of the briefing is to provide information about the PVS pilot program. Members of the public may attend in person or join via teleconference...

  18. NPDES Permit for Crow Municipal Rural & Industrial Pilot Water Treatment Plant in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0031827, the Crow Indian Tribe is authorized to discharge from the Crow Municipal Rural & Industrial (MR&I) Pilot Water Treatment Plant in Bighorn County, Montana to the Bighorn River.

  19. 76 FR 56262 - Community Advantage Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-12

    ... SMALL BUSINESS ADMINISTRATION [Docket No. SBA 2011-0003] Community Advantage Pilot Program AGENCY: U.S. Small Business Administration (SBA). ACTION: Notice of change to Community Advantage Pilot... Community Advantage Pilot Program. In that notice, SBA modified or waived as appropriate certain regulations...

  20. Full-Scale Transport Controlled Impact Demonstration Program Photographic/Video Coverage.

    DTIC Science & Technology

    1986-04-01

    Early morning haze - wind, dust - the many different fores of environmental air pollution will be taken into consideration. Depending on morning...NASA 21 PHOTO/TV VEHICLE NASA 25 GMO GROUND CREW ONBOARD CAMERAS * FIRE FIGHTING PHOTO NASA 25 PHOTO/TV OPERATIONS DIRECTOR L-2 *Jv. *,’.e...Airline Pilots Association Int. Lockheed 1625 Massachusetts Avenue, NW. Department 7475/Building 229A Washington, DC 20036 P.O. Box 551, Plant 2 Burbank

  1. Citrus Waste Biomass Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karel Grohman; Scott Stevenson

    Renewable Spirits is developing an innovative pilot plant bio-refinery to establish the commercial viability of ehtanol production utilizing a processing waste from citrus juice production. A novel process based on enzymatic hydrolysis of citrus processing waste and fermentation of resulting sugars to ethanol by yeasts was successfully developed in collaboration with a CRADA partner, USDA/ARS Citrus and Subtropical Products Laboratory. The process was also successfully scaled up from laboratory scale to 10,000 gal fermentor level.

  2. 36 CFR 223.275 - Establishment of a pilot program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Establishment of a pilot... Establishment of a pilot program. This subpart governs the Forest Service's pilot program for the disposal of... of Title III of H.R. 3423)), as amended in 2004 by Section 335 of Public Law 108-108. The pilot...

  3. Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregory Weatherby

    The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied researchmore » for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.« less

  4. H-Coal Pilot Plant Phase II construction, Catlettsburg, Kentucky. Final construction management report, December 1976-February 1980. [February, 1977 to approximately January, 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1983-03-01

    This report covers the H-Coal Pilot Plant facility located in Catlettsburg, Kentucky. The authorization for this project was under DOE contract No. DE-AC05-78ET11052, formally ET-78-C-01-3224. Badger Plants, Inc. carried out the construction management of this facility. The estimated total cost is $147,265,013. A brief process/technical description of the Pilot Plant covers subjects such as objectives, capacity, expected life, etc. A brief technical description of each processing unit, including its purpose in the overall operations of the plant is given. A general description of the organizational history of the project is given. Current overall organization and a description of the responsibilitiesmore » of each participant are included. Badger Plant's organization at manager level is shown.« less

  5. 48 CFR 252.232-7005 - Reimbursement of subcontractor advance payments-DoD pilot mentor-protege program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontractor advance payments-DoD pilot mentor-protege program. 252.232-7005 Section 252.232-7005 Federal... subcontractor advance payments—DoD pilot mentor-protege program. As prescribed in 232.412-70(c), use the following clause: Reimbursement of Subcontractor Advance Payments—DoD Pilot Mentor-Protege Program (SEP 2001...

  6. 49 CFR 381.510 - May the FMCSA end a pilot program before its scheduled completion date?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false May the FMCSA end a pilot program before its scheduled completion date? 381.510 Section 381.510 Transportation Other Regulations Relating to... Pilot Programs § 381.510 May the FMCSA end a pilot program before its scheduled completion date? The...

  7. 49 CFR 381.510 - May the FMCSA end a pilot program before its scheduled completion date?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false May the FMCSA end a pilot program before its scheduled completion date? 381.510 Section 381.510 Transportation Other Regulations Relating to... Pilot Programs § 381.510 May the FMCSA end a pilot program before its scheduled completion date? The...

  8. Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Britt, Phillip F

    2015-03-01

    Analysis of Waste Isolation Pilot Plant Samples: Integrated Summary Report. Summaries of conclusions, analytical processes, and analytical results. Analysis of samples taken from the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico in support of the WIPP Technical Assessment Team (TAT) activities to determine to the extent feasible the mechanisms and chemical reactions that may have resulted in the breach of at least one waste drum and release of waste material in WIPP Panel 7 Room 7 on February 14, 2014. This report integrates and summarizes the results contained in three separate reports, described below, and draws conclusions basedmore » on those results. Chemical and Radiochemical Analyses of WIPP Samples R-15 C5 SWB and R16 C-4 Lip; PNNL-24003, Pacific Northwest National Laboratory, December 2014 Analysis of Waste Isolation Pilot Plant (WIPP) Underground and MgO Samples by the Savannah River National Laboratory (SRNL); SRNL-STI-2014-00617; Savannah River National Laboratory, December 2014 Report for WIPP UG Sample #3, R15C5 (9/3/14); LLNL-TR-667015; Lawrence Livermore National Laboratory, January 2015 This report is also contained in the Waste Isolation Pilot Plant Technical Assessment Team Report; SRNL-RP-2015-01198; Savannah River National Laboratory, March 17, 2015, as Appendix C: Analysis Integrated Summary Report.« less

  9. Two treatment methods for stormwater sediments--pilot plant and landfarming--and reuse of the treated sediments in civil engineering.

    PubMed

    Petavy, F; Ruban, V; Conil, P; Viau, J Y; Auriol, J C

    2009-07-01

    The aim of this research was to present a pilot plant for the treatment of stormwater sediments and to compare the decontamination rate to that obtained by landfarming. The possibilities for reuse of the treated sediments in civil engineering are also studied. Four sediments from retention/infiltration ponds or from street sweeping were studied. In each case organic matter (OM), total hydrocarbons (TH) and polycyclic aromatic hydrocarbons (PAH) were measured. Geotechnical tests were carried out to evaluate the reuse possibilities of the treated sediments. Treatment by means of the pilot plant was efficient at reducing TH and PAH concentrations: THs were reduced by 53-97% and PAHs were decreased by 60-95%. By comparison, a reduction of 45-75% in TH concentration is obtained with landfarming, whereas there is no significant decrease in PAHs. Furthermore, geotechnical tests showed that the treated fractions from the pilot plant can be reused as road embankments and as a capping layer. These results are most encouraging and show that stormwater sediments can valuably be reused after treatment in a pilot plant. Landfarming is less efficient but this technique could be used as a pretreatment in the case of high TH pollution.

  10. Demonstration of a 100-kWth high-temperature solar thermochemical reactor pilot plant for ZnO dissociation

    NASA Astrophysics Data System (ADS)

    Koepf, E.; Villasmil, W.; Meier, A.

    2016-05-01

    Solar thermochemical H2O and CO2 splitting is a viable pathway towards sustainable and large-scale production of synthetic fuels. A reactor pilot plant for the solar-driven thermal dissociation of ZnO into metallic Zn has been successfully developed at the Paul Scherrer Institute (PSI). Promising experimental results from the 100-kWth ZnO pilot plant were obtained in 2014 during two prolonged experimental campaigns in a high flux solar simulator at PSI and a 1-MW solar furnace in Odeillo, France. Between March and June the pilot plant was mounted in the solar simulator and in-situ flow-visualization experiments were conducted in order to prevent particle-laden fluid flows near the window from attenuating transparency by blocking incoming radiation. Window flow patterns were successfully characterized, and it was demonstrated that particle transport could be controlled and suppressed completely. These results enabled the successful operation of the reactor between August and October when on-sun experiments were conducted in the solar furnace in order to demonstrate the pilot plant technology and characterize its performance. The reactor was operated for over 97 hours at temperatures as high as 2064 K; over 28 kg of ZnO was dissociated at reaction rates as high as 28 g/min.

  11. CO{sub 2} Reuse in Petrochemical Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jason Trembly; Brian Turk; Maruthi Pavani

    2010-12-31

    To address public concerns regarding the consequences of climate change from anthropogenic carbon dioxide (CO{sub 2}) emissions, the U.S. Department of Energy's National Energy Technology Laboratory (DOE/NETL) is actively funding a CO{sub 2} management program to develop technologies capable of mitigating CO{sub 2} emissions from power plant and industrial facilities. Over the past decade, this program has focused on reducing the costs of carbon capture and storage technologies. Recently, DOE/NETL launched an alternative CO{sub 2} mitigation program focused on beneficial CO{sub 2} reuse to support the development of technologies that mitigate emissions by converting CO{sub 2} into valuable chemicals andmore » fuels. RTI, with DOE/NETL support, has been developing an innovative beneficial CO{sub 2} reuse process for converting CO{sub 2} into substitute natural gas (SNG) by using by-product hydrogen (H{sub 2)-containing fuel gas from petrochemical facilities. This process leveraged commercial reactor technology currently used in fluid catalytic crackers in petroleum refining and a novel nickel (Ni)-based catalyst developed by RTI. The goal was to generate an SNG product that meets the pipeline specifications for natural gas, making the SNG product completely compatible with the existing natural gas infrastructure. RTI's technology development efforts focused on demonstrating the technical feasibility of this novel CO{sub 2} reuse process and obtaining the necessary engineering information to design a pilot demonstration unit for converting about 4 tons per day (tons/day) of CO{sub 2} into SNG at a suitable host site. This final report describes the results of the Phase I catalyst and process development efforts. The methanation activity of several commercial fixed-bed catalysts was evaluated under fluidized-bed conditions in a bench-scale reactor to identify catalyst performance targets. RTI developed two fluidizable Ni-based catalyst formulations (Cat-1 and Cat-3) that demonstrated equal or better performance than that of commercial methanation catalysts. The Cat-1 and Cat-3 formulations were successfully scaled up using commercial manufacturing equipment at the Sud-Chemie Inc. pilot-plant facility in Louisville, KY. Pilot transport reactor testing with RTI's Cat-1 formulation at Kellog Brown & Root's Technology Center demonstrated the ability of the process to achieve high single-pass CO{sub 2} conversion. Using information acquired from bench- and pilot-scale testing, a basic engineering design package was prepared for a 4-ton/day CO{sub 2} pilot demonstration unit, including process and instrumentation diagrams, equipment list, control philosophy, and preliminary cost estimate.« less

  12. 28 CFR 11.2 - Pilot program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Pilot program. 11.2 Section 11.2 Judicial... Pilot program. The Assistant Attorney General for Administration, in consultation with the Executive Office for United States Attorneys, shall designate the districts that will participate in the pilot...

  13. 28 CFR 11.2 - Pilot program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false Pilot program. 11.2 Section 11.2 Judicial... Pilot program. The Assistant Attorney General for Administration, in consultation with the Executive Office for United States Attorneys, shall designate the districts that will participate in the pilot...

  14. Design and operation of a pilot-plant for the processing of sugarcane juice into sugar at the Southern Regional Research Center in Louisiana

    USDA-ARS?s Scientific Manuscript database

    A pilot-plant facility to process sugarcane juice into sugar and molasses has been developed under a limited budget at the Southern Regional Research Center of the United States Department of Agriculture in New Orleans, Louisiana. The batch plant (27.9 m2) includes juice heating, clarification, eva...

  15. Long-term effects of exercise programs among helicopter pilots with flying related LBP

    PubMed Central

    Andersen, Knut; Baardsen, Roald; Dalen, Ingvild; Larsen, Jan Petter

    2017-01-01

    BACKGROUND: Flying related transient Low Back Pain (LBP) among helicopter pilots is considered an occupational distress. OBJECTIVE: To examine if exercise programs can alleviate transient LBP. METHODS: Sixty-five helicopter pilots (92% males), all reporting flying related LBP, responded to an epidemiological survey and a long-term follow-up, 44.8 months later, comprising questions regarding transient LBP and number of sick leaves. Data from 37 pilots participating in two exercise programs, A; general for LBP, B; focused for lumbar trunk (LT), included information from clinical examinations and muscular endurance tests of the LT before and after intervention. Twenty-eight pilots did not participate in any intervention. RESULTS: At long-term follow-up 42% of the pilots still reported flying related transient LBP. Among participants in program B 26% had persistent pain, 70% in program A and 46% among pilots without intervention. Sick-leave reduction was only observed among participants in program B (30% to 4%). Upon re-occurrence of LBP symptoms, half of the pilots in program B again performed exercises to improve their pain. CONCLUSION: This study indicates that exercise programs focused towards lumbar trunk muscular endurance reduces flying related transient LBP and sick-leave among helicopter pilots. These findings may have implications for the pilots’ working conditions. PMID:29278872

  16. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  17. 76 FR 70152 - Pilot Program for Early Feasibility Study Investigational Device Exemption Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-10

    ...] Pilot Program for Early Feasibility Study Investigational Device Exemption Applications AGENCY: Food and... feasibility study investigational device exemption (IDE) applications. The pilot program will conform to the... Feasibility Medical Device Clinical Studies, Including Certain First in Human (FIH) Studies.'' Under the pilot...

  18. 75 FR 39090 - Airport Privatization Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... Privatization Pilot Program AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of Receipt and... pilot program received under 49 U.S.C. Section 47134. The preliminary application is accepted for review... operator, negotiate an agreement and submit a final application to the FAA for exemption under the pilot...

  19. 78 FR 37642 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... will allow for further analysis of the Pilot Program and a determination of how the Pilot Program should be structured in the future. During this extension of the Pilot Program, CBOE proposes that it may... Pilot Program (i.e. June) would not be used for purposes of the six-month analysis. Thus, a replacement...

  20. 78 FR 37863 - Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement of Penny Pilot Issues... Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''), and to change the date when delisted classes may be replaced in the Penny Pilot.\\3\\ \\3\\ The Penny Pilot was...

  1. CURRENT STATUS OF ADVACATE PROCESS FOR FLUE GAS DESULFURIZATION

    EPA Science Inventory

    The following report discusses current bench- and pilot-plant advances in preparation of ADVAnced siliCATE (ADVACATE) calcium silicate sorbentsfor flue gas desulfurization. It also discusses current bench- and pilot-plant advances in sorbent preparation. Fly ash was ground in a l...

  2. Conceptual design of a lunar oxygen pilot plant Lunar Base Systems Study (LBSS) task 4.2

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The primary objective was to develop conceptual designs of two pilot plants to produce oxygen from lunar materials. A lunar pilot plant will be used to generate engineering data necessary to support an optimum design of a larger scale production plant. Lunar oxygen would be of primary value as spacecraft propellant oxidizer. In addition, lunar oxygen would be useful for servicing nonregenerative fuel cell power systems, providing requirements for life support, and to make up oxygen losses from leakage and airlock cycling. Thirteen different lunar oxygen production methods are described. Hydrogen reduction of ilmenite and extraction of solar-wind hydrogen from bulk lunar soil were selected for conceptual design studies. Trades and sensitivity analyses were performed with these models.

  3. General Aviation Pilot Education Program.

    ERIC Educational Resources Information Center

    Cole, Warren L.

    General Aviation Pilot Education (GAPE) was a safety program designed to improve the aeronautical education of the general aviation pilot in anticipation that the national aircraft accident rate might be improved. GAPE PROGRAM attempted to reach the average general aviation pilot with specific and factual information regarding the pitfalls of his…

  4. 36 CFR 223.275 - Establishment of a pilot program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Establishment of a pilot... PRODUCTS Forest Botanical Products § 223.275 Establishment of a pilot program. This subpart governs the Forest Service's pilot program for the disposal of forest botanical products, as authorized by the...

  5. Connected vehicle pilot deployment program phase 1 : lessons learned : final report.

    DOT National Transportation Integrated Search

    2017-01-30

    The Connected Vehicle Pilot Deployment (CV Pilots) Program seeks to spur innovation among early adopters of connected vehicle application concepts. Pilot deployment awards were given to three sites, New York City, Wyoming, and Tampa, FL. The CV pilot...

  6. 77 FR 22625 - Intermediary Lending Pilot (ILP) Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-16

    ... SMALL BUSINESS ADMINISTRATION Intermediary Lending Pilot (ILP) Program AGENCY: U.S. Small Business... Administration (SBA) requests that eligible organizations submit applications to become Intermediary Lending... implement an Intermediary Lending Pilot (ILP) program. Under the ILP program, SBA makes loans to selected...

  7. Intro to NREL's Thermochemical Pilot Plant

    ScienceCinema

    Magrini, Kim

    2018-02-13

    NREL's Thermochemical Pilot Plant converts biomass into higher hydrocarbon fuels and chemicals.NREL is researching biomass pyrolysis. The lab is examining how to upgrade bio-oils via stabilization. Along with this, NREL is developing the engineering system requirements for producing these fuels and chemicals at larger scales.

  8. ON-SITE PRODUCTION OF ACTIVATED CARBON FROM KRAFT BLACK LIQUOR

    EPA Science Inventory

    A pilot plant was designed and constructed to produce char via the St. Regis hydropyrolysis kraft chemical recovery process and to produce activated carbon from the char. This report includes discussion of laboratory and prepilot work, the pilot plant, and presents operating resu...

  9. 49 CFR 381.510 - May the FMCSA end a pilot program before its scheduled completion date?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... achieving a level of safety that is at least equivalent to the level of safety that would be achieved by... 49 Transportation 5 2010-10-01 2010-10-01 false May the FMCSA end a pilot program before its... Pilot Programs § 381.510 May the FMCSA end a pilot program before its scheduled completion date? The...

  10. Pilot plant test of the advanced flash stripper for CO2 capture.

    PubMed

    Lin, Yu-Jeng; Chen, Eric; Rochelle, Gary T

    2016-10-20

    Alternative stripping processes have been proposed to reduce energy use for CO 2 capture, but only a few have been applied to pilot-scale experiments. This paper presents the first pilot plant test results of one of the most promising stripper configurations, the advanced flash stripper with cold and warm rich solvent bypass. The campaign using aqueous piperazine was carried out at UT Austin in 2015. The advanced flash stripper improves the heat duty by over 25% compared to previous campaigns using the two-stage flash, achieving 2.1 GJ per tonne CO 2 of heat duty and 32 kJ mol -1 CO 2 of total equivalent work. The bypass control strategy proposed minimized the heat duty. The test successfully demonstrated the remarkable energy performance and the operability of this advanced system. An Aspen Plus® model was validated using the pilot plant data and used to explore optimum operating and design conditions. The irreversibility analysis showed that the pilot plant performance has attained 50% thermodynamic efficiency and further energy improvement should focus on the absorber and the cross exchanger by increasing absorption rate and solvent capacity.

  11. Aviation Centers Take Off as Airlines Face Pilot Shortfall.

    ERIC Educational Resources Information Center

    Mangan, Katherine S.

    2000-01-01

    Addresses aviation training requirements for pilots planning to fly for commercial airlines within or outside the United States. Describes two aviation training programs at Western Michigan University, a fast-track 13-month program and the traditional four-year program required for U.S. pilots. Notes that decreasing numbers of pilots trained in…

  12. 76 FR 79244 - Self-Regulatory Organizations; BATS Exchange, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-21

    ... Change To Extend the Penny Pilot Program December 15, 2011. Pursuant to Section 19(b)(1) of the... a proposal for the BATS Options Market (``BATS Options'') to extend through June 30, 2012, the Penny Pilot Program (``Penny Pilot'') in options classes in certain issues (``Pilot Program'') previously...

  13. Final voluntary release assessment/corrective action report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-11-12

    The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resourcemore » Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.« less

  14. WEST ELEVATION OF REMOTE ANALYTICAL FACILITY (CPP627) AND HOT PILOT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    WEST ELEVATION OF REMOTE ANALYTICAL FACILITY (CPP-627) AND HOT PILOT PLANT (CPP-640) LOOKING NORTHEAST. INL PHOTO NUMBER HD-22-2-1. Mike Crane, Photographer, 11/1998 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  15. ARCHITECTURAL FLOOR PLAN OF PROCESS AND ACCESS AREAS HOT PILOT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ARCHITECTURAL FLOOR PLAN OF PROCESS AND ACCESS AREAS HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111679. ALTERNATE ID NUMBER 8952-CPP-640-A-2. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  16. FATE OF SEX HORMONES IN TWO PILOT-SCALE MUNICIPAL WASTEWATER TREATMENT PLANTS: CONVENTIONAL TREATMENT

    EPA Science Inventory

    The fate of seven sex hormones (estrone (E1), estradiol (E2), estriol (E3), ethinylestradiol (EE2), testosterone, androstenedione, and progesterone) was determined in two pilot-scale wastewater treatment plants operated under conventional loading conditions. The levels of hormon...

  17. Advanced gasifier and water gas shift technologies for low cost coal conversion to high hydrogen syngas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kramer, Andrew Kramer

    The Gas Technology Institute (GTI) and team members RTI International (RTI), Coanda Research and Development, and Nexant, are developing and maturing a portfolio of technologies to meet the United States Department of Energy (DOE) goals for lowering the cost of producing high hydrogen syngas from coal for use in carbon capture power and coal-to-liquids/chemicals. This project matured an advanced pilot-scale gasifier, with scalable and commercially traceable components, to readiness for use in a first-of-a-kind commercially-relevant demonstration plant on the scale of 500-1,000 tons per day (TPD). This was accomplished through cold flow simulation of the gasifier quench zone transition regionmore » at Coanda and through an extensive hotfire gasifier test program on highly reactive coal and high ash/high ash fusion temperature coals at GTI. RTI matured an advanced water gas shift process and catalyst to readiness for testing at pilot plant scale through catalyst development and testing, and development of a preliminary design basis for a pilot scale reactor demonstrating the catalyst. A techno-economic analysis was performed by Nexant to assess the potential benefits of the gasifier and catalyst technologies in the context of power production and methanol production. This analysis showed an 18%reduction in cost of power and a 19%reduction in cost of methanol relative to DOE reference baseline cases.« less

  18. 78 FR 77509 - Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... Rule Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement of Penny Pilot... 30, 2014, the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''), and to change the date when delisted classes may be replaced in the Penny Pilot.\\3\\ \\3\\ The Penny...

  19. 76 FR 79268 - Self-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-21

    ... Proposed Rule Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement of Penny...: Extend through June 30, 2012, the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''); and replace any Penny Pilot issues that have been delisted.\\3\\ \\3\\ The Penny Pilot was...

  20. 76 FR 79247 - Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-21

    ... Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement of Penny Pilot Issues... Increments) to: Extend through June 30, 2012, the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''); and replace any Penny Pilot issues that have been delisted.\\3\\ \\3\\ The...

  1. 77 FR 40126 - Self-Regulatory Organizations; NASDAQ OMX Phlx, LLC; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement of Penny Pilot Issues...) to: extend through December 31, 2012, the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''); and provide for or allow replacement of any Penny Pilot issues that have...

  2. CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CP640) LOOKING NORTHWEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO OF HOT PILOT PLANT (CP-640) LOOKING NORTHWEST SHOWING FORMING AND PLACEMENT OF REINFORCING STEEL FOR SOUTH WALLS OF CELLS 1, 3, 4 AND 5 AND WEST WALL FOR CELLS 1 AND 2; CONSTRUCTION 13 PERCENT COMPLETE. INL PHOTO NUMBER NRTS 59-6436. J. Anderson, Photographer, 12/18/1959 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  3. 13 CFR 120.3 - Pilot programs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Pilot programs. 120.3 Section 120.3 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS General Descriptions of Sba's Business Loan Programs § 120.3 Pilot programs. The Administrator of SBA may from time to...

  4. 13 CFR 120.3 - Pilot programs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Pilot programs. 120.3 Section 120.3 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS General Descriptions of Sba's Business Loan Programs § 120.3 Pilot programs. The Administrator of SBA may from time to...

  5. 14 CFR 91.1031 - Pilot in command or second in command: Designation required.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Pilot in command or second in command... RULES Fractional Ownership Operations Program Management § 91.1031 Pilot in command or second in command: Designation required. (a) Each program manager must designate a— (1) Pilot in command for each program flight...

  6. 14 CFR 91.1031 - Pilot in command or second in command: Designation required.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Pilot in command or second in command... RULES Fractional Ownership Operations Program Management § 91.1031 Pilot in command or second in command: Designation required. (a) Each program manager must designate a— (1) Pilot in command for each program flight...

  7. 14 CFR 91.1031 - Pilot in command or second in command: Designation required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Pilot in command or second in command... RULES Fractional Ownership Operations Program Management § 91.1031 Pilot in command or second in command: Designation required. (a) Each program manager must designate a— (1) Pilot in command for each program flight...

  8. 14 CFR 91.1031 - Pilot in command or second in command: Designation required.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Pilot in command or second in command... RULES Fractional Ownership Operations Program Management § 91.1031 Pilot in command or second in command: Designation required. (a) Each program manager must designate a— (1) Pilot in command for each program flight...

  9. 14 CFR 91.1031 - Pilot in command or second in command: Designation required.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Pilot in command or second in command... RULES Fractional Ownership Operations Program Management § 91.1031 Pilot in command or second in command: Designation required. (a) Each program manager must designate a— (1) Pilot in command for each program flight...

  10. THE EFFECTIVENESS OF PILOT PROGRAMS COMPARED TO OTHER PROGRAMS OF VOCATIONAL AGRICULTURE IN TENNESSEE.

    ERIC Educational Resources Information Center

    LEGG, OTTO

    THE OBJECTIVE OF THIS COMPARATIVE STUDY WAS TO EVALUATE THE RELATIVE EFFECTIVENESS OF TENNESSEE VOCATIONAL AGRICULTURE PROGRAMS IN FOUR CATEGORIES -- (1) PILOT SCHOOLS, (2) LIKE-PILOT SCHOOLS OR SCHOOLS RESEMBLING PILOT SCHOOLS, (3) STUDENT TEACHING CENTERS, AND (4) NEGRO SCHOOLS. THE RANDOM SAMPLE INCLUDED 800 STUDENTS FROM 20 SCHOOLS DIVIDED…

  11. SuperPILOT: A Comprehensive Computer-Assisted Instruction Programming Language for the Apple II Computer.

    ERIC Educational Resources Information Center

    Falleur, David M.

    This presentation describes SuperPILOT, an extended version of Apple PILOT, a programming language for developing computer-assisted instruction (CAI) with the Apple II computer that includes the features of its early PILOT (Programmed Inquiry, Learning or Teaching) ancestors together with new features that make use of the Apple computer's advanced…

  12. 77 FR 75241 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... Rule Change To Extend the Penny Pilot Program December 13, 2012. Pursuant to Section 19(b)(1) \\1\\ of... to a pilot program to quote and to trade certain options in pennies (``Penny Pilot Program''). The... Exchange Act and distributed to Members. The Exchange may replace any penny pilot issues that have been...

  13. 27 CFR 25.292 - Daily records of operations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., or destroyed. (15) Beer received from other breweries or received from pilot brewing plants. (16) Beer and cereal beverage lost due to breakage, theft, casualty, or other unusual cause. (17) Brewing materials sold or transferred to pilot brewing plants (including the name and address of the person to whom...

  14. 27 CFR 25.292 - Daily records of operations.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., or destroyed. (15) Beer received from other breweries or received from pilot brewing plants. (16) Beer and cereal beverage lost due to breakage, theft, casualty, or other unusual cause. (17) Brewing materials sold or transferred to pilot brewing plants (including the name and address of the person to whom...

  15. DETERMINATION OF SEX HORMONES AND NONYLPHENOL ETHOXYLATES IN THE AQUEOUS MATRIXES OF TWO PILOT-SCALE MUNICIPAL WASTEWATER TREATMENT PLANTS

    EPA Science Inventory

    Two analytical methods were developed and refined for the detection and quantitation of two groups of endocrine-disrupting chemicals (EDCs) in the liquid matrixes of two pilot-scale municipal wastewater treatment plants. The targeted compounds are seven sex hormones (estradiol, ...

  16. First Year Evaluation of the Mathematics Pilot Programs, Grades K-8, [and] Appendices. Evaluation Department Report No. 381.

    ERIC Educational Resources Information Center

    Tomblin, Elizabeth A.; And Others

    The San Diego Board of Education requested that pilot programs be conducted with commercially developed (Grades K-8) mathematics textbooks and programs in order to determine which of the programs/texts were superior, and whether a district-developed program could successfully compete with commercially produced materials. The pilot program…

  17. 77 FR 77152 - Self-Regulatory Organizations; NASDAQ OMX BX, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... Relating to Extension of the Exchange's Penny Pilot Program December 21, 2012. Pursuant to Section 19(b)(1... Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot'') and provide a procedure for replacement of any Penny Pilot issues that have been delisted.\\3\\ \\3\\ The Penny Pilot was...

  18. 78 FR 37873 - Self-Regulatory Organizations; NASDAQ OMX BX, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... Extend the Penny Pilot Program June 18, 2013. Pursuant to Section 19(b)(1) of the Securities Exchange Act..., the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''), and to change the date when delisted classes may be replaced in the Penny Pilot.\\3\\ \\3\\ The Penny Pilot was...

  19. Project Columbiad: Reestablishment of human presence on the Moon

    NASA Technical Reports Server (NTRS)

    Shea, Joseph; Weiss, Stanley; Alexander, Harold; Belobaba, Peter; Loboda, Greg; Berry, Maresi; Bower, Mark; Bruen, Charles; Cazeau, Patrick; Clarke, Michael

    1992-01-01

    In response to the Report of the Advisory Committee on the future of the U.S. Space Program and a request from NASA's Exploration Office, the MIT Hunsaker Aerospace Corporation (HAC) conducted a feasibility study, known as Project Columbiad, on reestablishing human presence on the Moon before the year 2000. The mission criteria established were to transport a four person crew to the lunar surface at any latitude and back to Earth with a 14-28 day stay on the lunar surface. Safety followed by cost of the Columbiad Mission were the top level priorities of HAC. The resulting design has a precursor mission that emplaces the required surface payloads before the piloted mission arrives. Both the precursor and piloted missions require two National Launch System (NLS) launches. Both the precursor and piloted missions have an Earth orbit rendezvous (EOR) with a direct transit to the Moon post-EOR. The piloted mission returns to Earth via a direct transit. Included among the surface payloads preemplaced are a habitat, solar power plant (including fuel cells for the lunar night), lunar rover, and mecanisms used to cover the habitat with regolith (lunar soil) in order to protect the crew members from severe solar flare radiation.

  20. 75 FR 1591 - Green Technology Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-12

    ... DEPARTMENT OF COMMERCE Patent and Trademark Office Green Technology Pilot Program ACTION: Proposed... methods: E-mail: [email protected] . Include A0651-0062 Green Technology Pilot Program [email protected] in... green technologies, including greenhouse gas reduction. [[Page 1592

  1. Operating results and reinjection of Milos field in Greece

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hibara, Y.; Tahara, M.; Sakanashi, H.

    1989-01-01

    The Milos geothermal prospect located on one of the Cycladean islands of Greece represents a high temperature (320{sup 0}C), high silica content (1150 ppm) modified sea water resource. The program of development under taken by the Public Power Corporation (PPC) of Greece started with the drilling of a number of wells and has progressed to the installation of a pilot-style 2MW(e) condensing power plant which went on-line in December 1986. This plant has been provided by Mitsubishi Heavy Industries (MHI) under a contract with PPC. Geothermal South Pacific (GEOSPAC) was sub-contracted to MHI to provide technical and scientific assistance inmore » connection with reservoir related matters. The authors present the various studies and modification that were done to establish an acceptable method of plant operation and waste disposal.« less

  2. Extension of effective date for temporary pilot program setting the time and place for a hearing before an administrative law judge. Final rule.

    PubMed

    2013-07-29

    : We are extending our pilot program that authorizes the agency to set the time and place for a hearing before an administrative law judge (ALJ). This final rule will extend the pilot program for 1 year. The extension of the pilot program continues our commitment to improve the efficiency of our hearing process and maintain a hearing process that results in accurate, high-quality decisions for claimants. The current pilot program will expire on August 9, 2013. In this final rule, we are extending the effective date to August 9, 2014. We are making no other substantive changes.

  3. 77 FR 40120 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... Effectiveness of a Proposed Rule Change Relating to the Penny Pilot Program June 29, 2012. Pursuant to Section... relating to the Penny Pilot Program. The text of the proposed rule change is available on the Exchange's... The Penny Pilot Program is scheduled to expire on June 30, 2012. CBOE proposes to extend the Pilot...

  4. Thermal Storage Applications Workshop. Volume 1: Plenary Session Analysis

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The importance of the development of inexpensive and efficient thermal and thermochemical energy storage technology to the solar power program is discussed in a summary of workship discussions held to exchange information and plan for future systems. Topics covered include storage in central power applications such as the 10 MW-e demonstration pilot receiver to be constructed in Barstow, California; storage for small dispersed systems, and problems associated with the development of storage systems for solar power plants interfacing with utility systems.

  5. Preparing Expectant Couples for New-Parent Experiences: A Comparison of Two Models of Antenatal Education

    PubMed Central

    Schmied, Virginia; Myors, Karen; Wills, Jo; Cooke, Margaret

    2002-01-01

    This paper describes a pilot antenatal education program intended to better prepare couples for the early weeks of lifestyle changes and parenting. Eight weeks after birth, data were collected by questionnaire from 19 couples who participated in a pilot program and from 14 couples who were enrolled in a routine hospital program. Women in the pilot program were significantly more satisfied with their experience of parenthood. Facilitated gender-specific discussion groups formed a key strategy in the pilot program. PMID:17273305

  6. Particle collection by a pilot plant venturi scrubber downstream from a pilot plant electrostatic precipitator

    NASA Astrophysics Data System (ADS)

    Sparks, L. E.; Ramsey, G. H.; Daniel, B. E.

    The results of pilot plant experiments of particulate collection by a venturi scrubber downstream from an electrostatic precipitator (ESP) are presented. The data, which cover a range of scrubber operating conditions and ESP efficiencies, show that particle collection by the venturi scrubber is not affected by the upstream ESP; i.e., for a given scrubber pressure drop, particle collection efficiency as a function of particle diameter is the same for both ESP on and ESP off. The experimental results are in excellent agreement with theoretical predictions. Order of magnitude cost estimates indicate that particle collection by ESP scrubber systems may be economically attractive when scrubbers must be used for SO x control.

  7. Environmental readiness pilot study at the Badger Army Ammunition Plant, Baraboo, Wisconsin

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mays, D.; Bhinge, D.; Patel, J.

    1994-12-31

    The Badger Army Ammunition Plant (BAAP) has been on standby status since the mid-1970s, prior to the enactment of the majority of Federal environmental regulations. As a result, BAAP is unprepared to begin production without the implementation of pollution prevention and treatment measures. The Army contracted SAIC to conduct a pilot study to develop an environmental readiness plan for BAAP in the event that the plant is reactivated to produce explosives and propellants for ammunition requirements during mobilization. This paper describes the process developed by SAIC to conduct this pilot study at BAAP and the relationship between this effort andmore » the Army`s overall environmental mission.« less

  8. TRUPACT-II 157 Examination Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barry H. O'Brien; Jeffrey M. Lacy; Kip E. Archibald

    2003-12-01

    This report presents the results of examination and recovery activities performed on the TRUPACT-II 157 shipping container. The container was part of a contact-handled transuranic waste shipment being transported on a truck to the Waste Isolation Pilot Plant in New Mexico when an accident occurred. Although the transport vehicle sustained only minor damage, airborne transuranic contamination was detected in air samples extracted from inside TRUPACT-II 157 at the Waste Isolation Pilot Plant. Consequently, the shipping container was rejected, resealed, and returned to the Idaho National Engineering and Environmental Laboratory where the payload was disassembled, examined, and recovered for subsequent reshipmentmore » to the Waste Isolation Pilot Plant. This report documents the results of those activities.« less

  9. Modelling of sedimentation and remobilization in in-line storage sewers for stormwater treatment.

    PubMed

    Frehmann, T; Flores, C; Luekewille, F; Mietzel, T; Spengler, B; Geiger, W F

    2005-01-01

    A special arrangement of combined sewer overflow tanks is the in-line storage sewer with downstream discharge (ISS-down). This layout has the advantage that, besides the sewer system, no other structures are required for stormwater treatment. The verification of the efficiency with respect to the processes of sedimentation and remobilization of sediment within the in-line storage sewer with downstream discharge is carried out in a combination of a field and a pilot plant study. The model study was carried out using a pilot plant model scaled 1:13. The following is intended to present some results of the pilot plant study and the mathematical empirical modelling of the sedimentation and remobilization process.

  10. 14 CFR 91.1065 - Initial and recurrent pilot testing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Initial and recurrent pilot testing... Ownership Operations Program Management § 91.1065 Initial and recurrent pilot testing requirements. (a) No program manager or owner may use a pilot, nor may any person serve as a pilot, unless, since the beginning...

  11. 14 CFR 91.1065 - Initial and recurrent pilot testing requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Initial and recurrent pilot testing... Ownership Operations Program Management § 91.1065 Initial and recurrent pilot testing requirements. (a) No program manager or owner may use a pilot, nor may any person serve as a pilot, unless, since the beginning...

  12. The Community Liaison Program: A Health Education Pilot Program to Increase Minority Awareness of HIV and Acceptance of HIV Vaccine Trials

    ERIC Educational Resources Information Center

    Kelley, R. T.; Hannans, A.; Kreps, G. L.; Johnson, K.

    2012-01-01

    This paper describes a 16-month health education pilot program based on diffusion of innovation and social network theories. The program was implemented by volunteer community liaisons for the purposes of increasing awareness of and support for HIV vaccine research in minority populations. This theoretically driven pilot program allowed the…

  13. Nonmotorized transportation pilot program : continued progress in developing walking and bicycling networks - May 2014

    DOT National Transportation Integrated Search

    2014-05-01

    In 2005, the United States Congress directed the Federal Highway Administration (FHWA) to develop the Nonmotorized Transportation Pilot Program (NTPP). The program provided over $25 million in contract authority to four pilot communities (Columbia, M...

  14. 77 FR 14364 - Comment Sought on Funding Pilot Program Participants Transitioning Out of the Rural Health Care...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... Program Participants Transitioning Out of the Rural Health Care Pilot Program in Funding Year 2012 AGENCY..., the Wireline Competition Bureau seeks comment on whether to fund Rural Health Care Pilot Program... transition them into the permanent Rural Health Care support mechanism (RHC support mechanism). DATES...

  15. 77 FR 40342 - Extension of the Full First Action Interview Pilot Program and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-09

    ... Full First Action Interview Pilot Program and Request for Comments AGENCY: United States Patent and... Trademark Office (Office) is extending the First Action Interview (FAI) Pilot Program while completing a... of the examination process. Specifically, the program allows an applicant to conduct an interview...

  16. Use of a Modern Polymerization Pilot-Plant for Undergraduate Control Projects.

    ERIC Educational Resources Information Center

    Mendoza-Bustos, S. A.; And Others

    1991-01-01

    Described is a project where students gain experience in handling large volumes of hazardous materials, process start up and shut down, equipment failures, operational variations, scaling up, equipment cleaning, and run-time scheduling while working in a modern pilot plant. Included are the system design, experimental procedures, and results. (KR)

  17. Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance with the 40 CFR Part 191 Disposal Regulations (40 CFR Part 194)

    EPA Pesticide Factsheets

    EPA is responsible for certifying that DOE’s Waste Isolation Pilot Plant (WIPP) remains in compliance with environmental standards for the disposal of transuranic waste. 40 CFR Part 194 specifies criteria for certification or recertification of WIPP.

  18. Not-from-concentrate pilot plant ‘Wonderful’ cultivar pomegranate juice changes: Volatiles

    USDA-ARS?s Scientific Manuscript database

    Pilot plant ultrafiltration was used to mimic the dominant U.S. commercial pomegranate juice extraction method (hydraulic pressing whole fruit), to deliver a not-from-concentrate (NFC) juice that was high-temperature short-time pasteurized and stored at 4 and 25 °C. Recovered were 46 compounds, of ...

  19. Pasteurization of strawberry puree using a pilot plant pulsed electric fields (PEF) system

    USDA-ARS?s Scientific Manuscript database

    The processing of strawberry puree by pulsed electric fields (PEF) in a pilot plant system has never been evaluated. In addition, a method does not exist to validate the exact number and shape of the pulses applied during PEF processing. Both buffered peptone water (BPW) and fresh strawberry puree (...

  20. Waste Isolation Pilot Plant Technical Assessment Team Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL).

  1. [Yield of starch extraction from plantain (Musa paradisiaca). Pilot plant study].

    PubMed

    Flores-Gorosquera, Emigdia; García-Suárez, Francisco J; Flores-Huicochea, Emmanuel; Núñez-Santiago, María C; González-Soto, Rosalia A; Bello-Pérez, Luis A

    2004-01-01

    In México, the banana (Musa paradisiaca) is cooked (boiling or deep frying) before being eaten, but the consumption is not very popular and a big quantity of the product is lost after harvesting. The unripe plantain has a high level of starch and due to this the use of banana can be diversified as raw material for starch isolation. The objective of this work was to study the starch yield at pilot plant scale. Experiments at laboratory scale were carried out using the pulp with citric acid to 0,3 % (antioxidant), in order to evaluate the different unitary operations of the process. The starch yield, based on starch presence in the pulp that can be isolated, were between 76 and 86 %, and the values at pilot plant scale were between 63 and 71 %, in different lots of banana fruit. Starch yield values were similar among the diverse lots, showing that the process is reproducible. The lower values of starch recovery at pilot plant scale are due to the loss during sieving operations; however, the amount of starch recovery is good.

  2. Solar photocatalytic degradation of some hazardous water-soluble pesticides at pilot-plant scale.

    PubMed

    Oller, I; Gernjak, W; Maldonado, M I; Pérez-Estrada, L A; Sánchez-Pérez, J A; Malato, S

    2006-12-01

    The technical feasibility and performance of photocatalytic degradation of six water-soluble pesticides (cymoxanil, methomyl, oxamyl, dimethoate, pyrimethanil and telone) have been studied at pilot-plant scale in two well-defined systems which are of special interest because natural solar UV light can be used: heterogeneous photocatalysis with titanium dioxide and homogeneous photocatalysis by photo-Fenton. TiO(2) photocatalysis tests were performed in a 35L solar pilot plant with three Compound Parabolic Collectors (CPCs) under natural illumination and a 75L solar pilot plant with four CPC units was used for homogeneous photocatalysis tests. The initial pesticide concentration studied was 50 mg L(-1) and the catalyst concentrations employed were 200 mg L(-1) of TiO(2) and 20 mg L(-1) of iron. Both toxicity (Vibrio fischeri, Biofix) and biodegradability (Zahn-Wellens test) of the initial pesticide solutions were also measured. Total disappearance of the parent compounds and nearly complete mineralization were attained with all pesticides tested. Treatment time, hydrogen peroxide consumption and release of heteroatoms are discussed.

  3. Dryden Test Pilots 1990 - Smolka, Fullerton, Schneider, Dana, Ishmael, Smith, and McMurtry

    NASA Technical Reports Server (NTRS)

    1990-01-01

    It was a windy afternoon on Rogers Dry Lake as the research pilots of the National Aeronautics and Space Administration's Ames-Dryden Flight Research Facility gathered for a photo shoot. It was a special day too, the 30th anniversary of the first F-104 flight by research pilot Bill Dana. To celebrate, a fly over of Building 4800, in formation, was made with Bill in a Lockheed F-104 (826), Gordon Fullerton in a Northrop T-38, and Jim Smolka in a McDonnell Douglas F/A-18 (841) on March 23, 1990. The F-18 (841), standing on the NASA ramp is a backdrop for the photo of (Left to Right) James W. (Smoke) Smolka, C. Gordon Fullerton, Edward T. (Ed) Schneider, William H. (Bill) Dana, Stephen D. (Steve) Ishmael, Rogers E. Smith, and Thomas C. (Tom) McMurtry. Smolka joined NASA Ames-Dryden Flight Research Facility in September 1985. He has been the project pilot on the F-15 Advanced Control Technology for Integrated Vehicles (ACTIVE) research and F-15 Aeronautical Research Aircraft programs. He has also flown as a pilot on the NASA B-52 launch aircraft, as a co-project pilot on the F-16XL Supersonic Laminar Flow Control aircraft and the F-18 High Angle-of-Attack Research Vehicle (HARV) aircraft. Other aircraft he has flown in research programs are the F-16, F-111, F-104 and the T-38 as support. Fullerton, joined NASA's Ames-Dryden Flight Research Facility in November 1986. He was project pilot on the NASA/Convair 990 aircraft to test space shuttle landing gear components, project pilot on the F-18 Systems Research Aircraft, and project pilot on the B-52 launch aircraft, where he was involved in six air launches of the commercially developed Pegasus space launch vehicle. Other assignments include a variety of flight research and support activities in multi-engine and high performance aircraft such as, F-15, F-111, F-14, X-29, MD-11 and DC-8. Schneider arrived at the NASA Ames-Dryden Flight Research Facility on July 5, 1982, as a Navy Liaison Officer, becoming a NASA research pilot one year later. He has been project pilot for the F-18 High Angle-of-Attack program (HARV), project pilot for the F-15 aeronautical research aircraft, the NASA B-52 launch aircraft, and the SR-71 'Blackbird' aircraft. His past research work at Dryden has included participation in the F-8 Digital Fly-By-Wire, the FAA/NASA 720 Controlled Impact Demonstration, the F-14 Automatic Rudder Interconnect and Laminar Flow programs, and the F-104 Aeronautical Research and Microgravity programs. Dana joined the NASA's High-Speed Flight Station on October 1, 1958. As a research pilot, he was involved in some of the most significant aeronautical programs carried out at the Center. In the late 1960s and in the 1970s Dana was a project pilot on the lifting body program, flying the wingless M2-F1, HL-10, M2-F3, and the X-24B vehicles. He was a project pilot on the hypersonic X-15 research aircraft and flew the rocket-powered vehicle 16 times, reaching a speed of 3,897 mph and an altitude of 310,000 feet. Bill was the pilot on the final (199th) flight of the 10-year program. Other research and support programs Dana participated in were the F-15 Highly Integrated Digital Electronic Control (HIDEC), the F-18 High Angle-of-Attack Research Vehicle (HARV), YF-12, F-104, F-16, PA-30, and T-38. In 1993 Dana became Chief Engineer at NASA's Ames-Dryden Flight Research Facility (soon to be renamed the Dryden Flight Research Center). Ishmael was a research pilot at NASA's Dryden Flight Research Center from January 1977 until the spring of 1995, when he became manager of Dryden's Reusable Launch Vehicle (RLV) programs. In 1996 he became NASA's X-33 Deputy Manager for Flight Test and Operation. As a research pilot he served as the chief project pilot on two major aeronautical research programs, the SR-71 High Speed Research program and the F-16XL Laminar Flow Technology program. He took part in the X-29 Forward-Swept-Wing program, and gave support to other pilots' research flights in a T-38 and F-104 aircraft. Smith became a research pilot at NASA's Ames-Dryden Flight Research Facility in August 1982. In the spring of 1995 he became Chief of the Flight Crew Branch where currently there are 8 other NASA pilots and 2 flight engineers. Smith has also been a co-project pilot on two major aeronautical programs at Dryden. They are the integrated thrust vectoring F-15 ACTIVE and the SR-71 'Blackbird' Research programs. Other research programs that he has been associated with are the F-104 Zero 'G' tests, F-18 HARV, X-29 Forward-Swept-Wing, with support flights being flown in a T-38 and F-104. McMurtry has been a pilot at NASA's Dryden since joining the Flight Research Center in November 1967. In 1981, Tom became Chief Pilot a position he held until February 1986, when he was appointed Chief of the Research Aircraft Operations Division. McMurtry has been project pilot for the AD-1 Oblique Wing program, the F-15 Digital Electronic Engine Control (DEEC) project and the F-8 Supercritical Wing program. He was co- project pilot on the F-15 ACTIVE program, F-8 Digital Fly-By-Wire program and on several remotely piloted research vehicle programs such as the FAA/NASA 720 Controlled Impact Demonstration and the sub-scale F-15 spin research project. He has also been a co-project pilot on the NASA 747 Shuttle Carrier Aircraft.

  4. 75 FR 8190 - Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... soliciting comments concerning the Financial Education and Counseling (FEC) Pilot Program Application. DATES... Education and Counseling Pilot Program Application. OMB Number: 1559-0034. Abstract: The purpose of the FEC... financial education and counseling services to prospective homebuyers. The FEC Pilot Program was authorized...

  5. 47 CFR 73.4246 - Stereophonic pilot subcarrier use during monophonic programming.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Stereophonic pilot subcarrier use during monophonic programming. 73.4246 Section 73.4246 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4246 Stereophonic pilot subcarrier use during monophonic programming. See Report and Order, Docket...

  6. 47 CFR 73.4246 - Stereophonic pilot subcarrier use during monophonic programming.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Stereophonic pilot subcarrier use during monophonic programming. 73.4246 Section 73.4246 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4246 Stereophonic pilot subcarrier use during monophonic programming. See Report and Order, Docket...

  7. 47 CFR 73.4246 - Stereophonic pilot subcarrier use during monophonic programming.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Stereophonic pilot subcarrier use during monophonic programming. 73.4246 Section 73.4246 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4246 Stereophonic pilot subcarrier use during monophonic programming. See Report and Order, Docket...

  8. 47 CFR 73.4246 - Stereophonic pilot subcarrier use during monophonic programming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Stereophonic pilot subcarrier use during monophonic programming. 73.4246 Section 73.4246 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4246 Stereophonic pilot subcarrier use during monophonic programming. See Report and Order, Docket...

  9. 75 FR 64692 - Green Technology Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ... DEPARTMENT OF COMMERCE Patent and Trademark Office Green Technology Pilot Program ACTION: Proposed...- 0062 Green Technology Pilot Program comment'' in the subject line of the message. Fax: 571-273-0112... permits patent applications pertaining to green technologies, including greenhouse gas reduction, to be...

  10. 47 CFR 73.4246 - Stereophonic pilot subcarrier use during monophonic programming.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Stereophonic pilot subcarrier use during monophonic programming. 73.4246 Section 73.4246 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4246 Stereophonic pilot subcarrier use during monophonic programming. See Report and Order, Docket...

  11. 77 FR 40109 - Self-Regulatory Organizations; BATS Exchange, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... Rule Change To Extend the Penny Pilot Program June 28, 2012. Pursuant to Section 19(b)(1) \\1\\ of the... December 31, 2012, the Penny Pilot Program (``Penny Pilot'') in options classes in certain issues (``Pilot... applicable to BATS Options' participation in the Penny Pilot, were approved on January 26, 2010. See...

  12. 78 FR 37862 - Self-Regulatory Organizations; BATS Exchange, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... Change To Extend the Penny Pilot Program June 18, 2013. Pursuant to Section 19(b)(1) of the Securities... December 31, 2013, the Penny Pilot Program (``Penny Pilot'') in options classes in certain issues (``Pilot... applicable to BATS Options' participation in the Penny Pilot, were approved on January 26, 2010. See...

  13. 77 FR 77174 - Self-Regulatory Organizations; NASDAQ OMX PHLX, LLC; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement of Penny Pilot Issues... filing with the Commission a proposal to: extend through June 30, 2013, the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''), and to change the date when delisted...

  14. CSER-98-002: Criticality analysis for the storage of special nuclear material sources and standards in the WRAP facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GOLDBERG, H.J.

    1999-05-18

    The Waste Receiving and Processing (WRAP) Facility will store uranium and transuranic (TRU) sources and standards for certification that WRAP meets the requirements of the Quality Assurance Program Plan (QAPP) for the Waste Isolation Pilot Plant (WIPP). In addition, WRAP must meet internal requirements for testing and validation of measuring instruments for nondestructive assay (NDA). In order to be certified for WIPP, WRAP will participate in the NDA Performance Demonstration Program (PDP). This program is a blind test of the NDA capabilities for TRU waste. It is intended to ensure that the NDA capabilities of this facility satisfy the requirementsmore » of the quality assurance program plan for the WIPP. The PDP standards have been provided by the Los Alamos National Laboratory (LANL) for this program. These standards will be used in the WRAP facility.« less

  15. 77 FR 6619 - Community Advantage Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... access to capital for small businesses and entrepreneurs in underserved markets, SBA is issuing this... (``CA Pilot Program'') (76 FR 9626). The CA Pilot Program was introduced to increase SBA-guaranteed... small businesses and entrepreneurs in underserved markets, SBA is issuing this Notice to revise several...

  16. STEM Pilot Project Grant Program: Report to the Legislature, June 2016

    ERIC Educational Resources Information Center

    Noahr, Lorrell; Black, Scott; Rogers, Justin

    2016-01-01

    The Washington State Legislature established the Science, Technology, Engineering, & Math (STEM) Pilot Program in the 2015-2017 capital budget (Chapter 3, Laws of 2015, 3rd Sp. Session, Section 5026) and provided $12,500,000 for this pilot grant program. Grants awarded under this program constitute the districts' local funding for purposes of…

  17. 7 CFR 210.28 - Pilot project exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Pilot project exemptions. 210.28 Section 210.28... AGRICULTURE CHILD NUTRITION PROGRAMS NATIONAL SCHOOL LUNCH PROGRAM Additional Provisions § 210.28 Pilot project exemptions. Those State agencies or school food authorities selected for the pilot projects...

  18. 7 CFR 210.28 - Pilot project exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Pilot project exemptions. 210.28 Section 210.28... AGRICULTURE CHILD NUTRITION PROGRAMS NATIONAL SCHOOL LUNCH PROGRAM Additional Provisions § 210.28 Pilot project exemptions. Those State agencies or school food authorities selected for the pilot projects...

  19. A 10-MWe solar-thermal central-receiver pilot plant: Solar facilities design integration. Plant operating/training manual (RADL-Item 2-36)

    NASA Astrophysics Data System (ADS)

    1982-07-01

    Plant and system level operating instructions are provided for the Barstow Solar Pilot Plant. Individual status instructions are given that identify plant conditions, process controller responsibilities, process conditions and control accuracies, operating envelopes, and operator cautions appropriate to the operating condition. Transition operating instructions identify the sequence of activities to be carried out to accomplish the indicated transition. Most transitions involve the startup or shutdown of an individual flowpath. Background information is provided on collector field operations, and the heliostat groupings and specific commands used in support receiver startup are defined.

  20. 77 FR 13343 - Pilot Program for Early Feasibility Study Investigational Device Exemption Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ...] Pilot Program for Early Feasibility Study Investigational Device Exemption Applications; Termination of... acceptance of nominations for the Early Feasibility Study Investigational Device Exemption (IDE) Applications... technologies to participate in a pilot program for early feasibility study IDE applications. FDA is also...

  1. 36 CFR 223.275 - Establishment of a pilot program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Forest Botanical Products § 223.275 Establishment of a pilot program. This subpart governs the Forest Service's pilot program for the disposal of forest botanical products, as authorized by the...

  2. 36 CFR 223.275 - Establishment of a pilot program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Forest Botanical Products § 223.275 Establishment of a pilot program. This subpart governs the Forest Service's pilot program for the disposal of forest botanical products, as authorized by the...

  3. 36 CFR 223.275 - Establishment of a pilot program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Forest Botanical Products § 223.275 Establishment of a pilot program. This subpart governs the Forest Service's pilot program for the disposal of forest botanical products, as authorized by the...

  4. 77 FR 40666 - Self-Regulatory Organizations; NASDAQ OMX BX, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Relating to Extension of the Exchange's Penny Pilot Program July 3, 2012. Pursuant to Section 19(b)(1) \\1... 31, 2012, the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot'').\\4\\ \\4\\ The Penny Pilot was established in June 2012. See Securities Exchange Act Release No. 67256...

  5. Coyote Creek (Santa Clara County) Pilot Revegetation Project

    Treesearch

    John T. Stanley; L. R. Silva; H. C. Appleton; M. S. Marangio; W. J. Lapaz; B. H. Goldner

    1989-01-01

    The Santa Clara Valley Water District, located in Northern California, is currently evaluating a pilot riparian revegetation project on a 1.6 ha (4 ac) site adjacent to Coyote Creek in the south San Francisco Bay Area. Specific techniques used during the design, site preparation and installation of 3640 plants (including seed planting locations) are described. This...

  6. DOE's Notification of Planned Change to the EPA 40 CFR Part 194 Certification of the Waste Isolation Pilot Plant: Remote-Handled Transuranic Waste Characterization Plan

    EPA Pesticide Factsheets

    The U.S. Department of Energy's Carlsbad Field Office (DOE/CBFO) provided the U.S. Environmental Protection Agency (EPA) this Notification of Planned Change to accept remote-handled (RH) transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP).

  7. Bagasse utilization in Cuba

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Fluctuations in world sugar prices retard economic development in sugar-producing countries like Cuba, and so there is a pressing need to find alternative uses for sugar cane through the industrialization of its by-products, such as bagasse. In 1971 the United Nations Development Program began a cooperative venture with the Cuban Research Institute for Sugar Cane Derivatives to develop methods of making newsprint from bagasse. An experimental plant - Cuba 9, located 35 kilometers south of Havana, was inaugurated in May 1981. It is semi-commercial in character and has a daily capacity of 34 tonnes of newsprint and five tonnes ofmore » dissolving pulp. Pilot plants for the production of furfural and for the production of reconstituted panelboard are in operation.« less

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Logan, A.; Devenny, D.; Porcari, G.

    The activities carried out and the results obtained from a 15 tons/hour oil sands extraction pilot plant operated in Fort McMurray in Northern Alberta are described. The process is the Rio Tinto TIL Holding S.A. (RTR)/Gulf Canada Lt. Oil Sands Extraction Process. It is a modified hot water extraction process. It is used to extract bitumen from Athabasca oil sands. The test ran from July to December 1981 through ambient conditions ranging from plus 38/sup 0/C to minus 30/sup 0/C (100/sup 0/F to -22/sup 0/F). The process, the on-site facilities, the test program, an analysis of plant performance, an appraisalmore » of the process economics, and an evaluation of its potential application are described.« less

  9. Characterization of coals for circulating fluidized bed combustion by pilot scale tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lopez, L.A.; Cabanillas, A.C.; Becerra, J.O. de

    1995-12-31

    The major part of the Spanish coal supply is low range coal with both high ash (20--40%) and sulfur (1--8%) content. The use of this coal, by conventional combustion processes in power and industrial plants, implies a very high environmental impact. The Circulating Fluidized Bed Combustion process enables an efficient use of this coal. The Centro de Investigaciones Energeticas, Medioambientales y Tecnologicas is carrying out a program with the intention of assisting companies in evaluating fuel quality impact, using atmospheric fluidized bed combustion. This paper reviews the major results of the fuel program in order to determine the fluidized bedmore » combustion performance of four fuels. Two lignites, a bituminous coal and an anthracite. The two lignites have very high sulfur content (7% and 8%) but the sulfur is organic in one case and pyritic in the other. The bituminous coal and the anthracite have 1% and 2% sulfur content respectively and the sulfur is pyritic in these cases. In order to reduce the sulfur in the flue gases, a high calcium content limestone has been used as sorbent. The combustion trials have been done in a circulating fluidized bed pilot plant with a 200 mm inside diameter and a height of 6.5 m. The influence of temperature, fluidization velocity, oxygen excess, Ca/S ratio and coal properties have been studied in relation to the combustion efficiency, sulfur retention, CO and NO{sub x} emissions.« less

  10. Plutonium mining for cleanup.

    PubMed

    Bramlitt, E T

    1988-08-01

    Cleanup is the act of making a contaminated site relatively free of Pu so it may be used without radiological safety restrictions. Contaminated ground is the focus of major cleanups. Cleanup traditionally involves determining Pu content of soil, digging up soil in which radioactivity exceeds guidelines, and relocating excised soil to a waste-disposal site. Alternative technologies have been tested at Johnston Atoll (JA), where there is as much as 100,000 m3 of Pu-contaminated soil. A mining pilot plant operated for the first 6 mo of 1986 and made 98% of soil tested "clean", from more than 40 kBq kg-1 (1000 pCi g-1) to less than about 500 Bq kg-1 (15 pCi g-1) by concentrating Pu in 2% of the soil. The pilot plant is now installed at the U.S. Department of Energy Nevada Test Site for evaluating cleanup of other contaminated soils and refining cleanup effectiveness. A full-scale cleanup plant has been programmed for JA in 1988. In this paper, previous cleanups are reviewed, and the mining endeavor at JA is detailed. "True soil cleanup" is contrasted with the classical "soil relocation cleanup." The mining technology used for Pu cleanup has been in use for more than a century. Mining for cleanup, however, is unique. It is envisioned as being prominent for radiological and other cleanups in the future.

  11. 76 FR 55335 - Alternate Passenger Rail Service Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... proceeding to develop a pilot program that permits a rail carrier or rail carriers that own infrastructure... develop a pilot program that permits a rail carrier or rail carriers that own infrastructure over which... that permits a rail carrier or rail carriers that own infrastructure over which Amtrak operates a...

  12. 77 FR 10599 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation and annual audits during each subsequent year of State participation. This...

  13. PILOT: A Programming Language for Beginners.

    ERIC Educational Resources Information Center

    Schnorr, Janice M.

    The presentation describes PILOT (Programmed Inquiry, Learning or Teaching), a special programing language easy for beginners to learn and available for several brands of microcomputers. PILOT is explained to contain substantially fewer commands than most other languages and to be written in an easy to understand manner. Edit commands and their…

  14. 24 CFR 982.642 - Homeownership option: Pilot program for homeownership assistance for disabled families.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... for homeownership assistance for disabled families. 982.642 Section 982.642 Housing and Urban... option: Pilot program for homeownership assistance for disabled families. (a) General. This section... Act of 2000. Under the pilot program, a PHA may provide homeownership assistance to a disabled family...

  15. 24 CFR 982.642 - Homeownership option: Pilot program for homeownership assistance for disabled families.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... for homeownership assistance for disabled families. 982.642 Section 982.642 Housing and Urban... option: Pilot program for homeownership assistance for disabled families. (a) General. This section... Act of 2000. Under the pilot program, a PHA may provide homeownership assistance to a disabled family...

  16. 24 CFR 982.642 - Homeownership option: Pilot program for homeownership assistance for disabled families.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... for homeownership assistance for disabled families. 982.642 Section 982.642 Housing and Urban... option: Pilot program for homeownership assistance for disabled families. (a) General. This section... Act of 2000. Under the pilot program, a PHA may provide homeownership assistance to a disabled family...

  17. 24 CFR 982.642 - Homeownership option: Pilot program for homeownership assistance for disabled families.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... for homeownership assistance for disabled families. 982.642 Section 982.642 Housing and Urban... option: Pilot program for homeownership assistance for disabled families. (a) General. This section... Act of 2000. Under the pilot program, a PHA may provide homeownership assistance to a disabled family...

  18. 24 CFR 982.642 - Homeownership option: Pilot program for homeownership assistance for disabled families.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... for homeownership assistance for disabled families. 982.642 Section 982.642 Housing and Urban... option: Pilot program for homeownership assistance for disabled families. (a) General. This section... Act of 2000. Under the pilot program, a PHA may provide homeownership assistance to a disabled family...

  19. 40 CFR 403.20 - Pretreatment Program Reinvention Pilot Projects Under Project XL.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Pretreatment Program Reinvention Pilot Projects Under Project XL. 403.20 Section 403.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... OF POLLUTION § 403.20 Pretreatment Program Reinvention Pilot Projects Under Project XL. The Approval...

  20. 76 FR 3192 - Value Pricing Pilot Program Participation, Fiscal Years 2010 and 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Value Pricing Pilot Program... Value Pricing Pilot (VPP) program, which was published on October 19, 2010, at 75 FR 64397. The original... interest at the following Web site: http://ops.fhwa.dot.gov/tolling_pricing/participation.htm . FOR FURTHER...

  1. 75 FR 80827 - Compliance Policy Guide; Radiofrequency Identification Feasibility Studies and Pilot Programs for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ... Identification (RFID) Feasibility Studies and Pilot Programs for Drugs'' to December 31, 2012. FOR FURTHER... Sec. 400.210 entitled ``Radiofrequency Identification (RFID) Feasibility Studies and Pilot Programs... FR 65750, November 23, 2007; 73 FR 78371, December 22, 2008). FDA has identified RFID as a promising...

  2. 14 CFR 135.341 - Pilot and flight attendant crewmember training programs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Pilot and flight attendant crewmember... ON BOARD SUCH AIRCRAFT Training § 135.341 Pilot and flight attendant crewmember training programs. (a... flight attendant crewmember shall establish and maintain an approved flight attendant training program...

  3. 14 CFR 135.341 - Pilot and flight attendant crewmember training programs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Pilot and flight attendant crewmember... ON BOARD SUCH AIRCRAFT Training § 135.341 Pilot and flight attendant crewmember training programs. (a... flight attendant crewmember shall establish and maintain an approved flight attendant training program...

  4. 14 CFR 135.341 - Pilot and flight attendant crewmember training programs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Pilot and flight attendant crewmember... ON BOARD SUCH AIRCRAFT Training § 135.341 Pilot and flight attendant crewmember training programs. (a... flight attendant crewmember shall establish and maintain an approved flight attendant training program...

  5. 14 CFR 135.341 - Pilot and flight attendant crewmember training programs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Pilot and flight attendant crewmember... ON BOARD SUCH AIRCRAFT Training § 135.341 Pilot and flight attendant crewmember training programs. (a... flight attendant crewmember shall establish and maintain an approved flight attendant training program...

  6. 14 CFR 135.341 - Pilot and flight attendant crewmember training programs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot and flight attendant crewmember... ON BOARD SUCH AIRCRAFT Training § 135.341 Pilot and flight attendant crewmember training programs. (a... flight attendant crewmember shall establish and maintain an approved flight attendant training program...

  7. 14 CFR 91.1051 - Pilot safety background check.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Pilot safety background check. 91.1051... Operations Program Management § 91.1051 Pilot safety background check. Within 90 days of an individual beginning service as a pilot, the program manager must request the following information: (a) FAA records...

  8. Final Remedial Investigation Sampling Plan Addendum. Milan Army Ammunition Plant Remedial Investigation Southern Study Area (Operable Unit No. 5)

    DTIC Science & Technology

    1997-09-01

    91-D-0012 Task Order No. 0007 2.4.7 Milan Army Ammunition Plant, Phytoremediation Pilot Study, USAEC, 1996 .. .............................. 2-28 2.5...indicated that heavy metal contamination (lead, chromium, and mercury ) was present at relatively low levels, and explosive contamination was limited to...and MI172 where lead was found at 22.9 j.g/1 and 18.4 Ig/l, respectively. 2.4.7 Milan Army Ammunition Plant, Phytoremediation Pilot Study, USAEC, 1996

  9. Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Task 5 Full-Scale Test Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gary Blythe; MariJon Owens

    2007-12-01

    This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project is to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate whether the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from the FGD liquor and bulkmore » solid byproducts for separate disposal. The project is conducting pilot- and full-scale tests of the additives in wet FGD absorbers. The tests are intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power has provided the Texas lignite/PRB co-fired test site for pilot FGD tests and cost sharing. Southern Company has provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation is providing the TMT-15 additive, and the Nalco Company is providing the Nalco 8034 additive. Both companies are also supplying technical support to the test program as in-kind cost sharing. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests and the full-scale test using high-sulfur coal were completed in 2005 and 2006 and have been previously reported. This topical report presents the results from the Task 5 full-scale additive tests, conducted at Southern Company's Plant Yates Unit 1. Both additives were tested there.« less

  10. Field-based evaluation of two herbaceous plant community composition sampling methods for long-term monitoring in Northern Great Plains National Parks

    USGS Publications Warehouse

    Symstad, Amy J.; Wienk, Cody L.; Thorstenson, Andy

    2006-01-01

    The Northern Great Plains Inventory & Monitoring (I&M) Network (Network) of the National Park Service (NPS) consists of 13 NPS units in North Dakota, South Dakota, Nebraska, and eastern Wyoming. The Network is in the planning phase of a long-term program to monitor the health of park ecosystems. Plant community composition is one of the 'Vital Signs,' or indicators, that will be monitored as part of this program for three main reasons. First, plant community composition is information-rich; a single sampling protocol can provide information on the diversity of native and non-native species, the abundance of individual dominant species, and the abundance of groups of plants. Second, plant community composition is of specific management concern. The abundance and diversity of exotic plants, both absolute and relative to native species, is one of the greatest management concerns in almost all Network parks (Symstad 2004). Finally, plant community composition reflects the effects of a variety of current or anticipated stressors on ecosystem health in the Network parks including invasive exotic plants, large ungulate grazing, lack of fire in a fire-adapted system, chemical exotic plant control, nitrogen deposition, increased atmospheric carbon dioxide concentrations, and climate change. Before the Network begins its Vital Signs monitoring, a detailed plan describing specific protocols used for each of the Vital Signs must go through rigorous development and review. The pilot study on which we report here is one of the components of this protocol development. The goal of the work we report on here was to determine a specific method to use for monitoring plant community composition of the herb layer (< 2 m tall).

  11. Regulatory basis for the Waste Isolation Pilot Plant performance assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HOWARD,BRYAN A.; CRAWFORD,M.B.; GALSON,D.A.

    2000-05-22

    The Waste Isolation Pilot Plant (WIPP) is the first operational repository designed for the safe disposal of transuranic (TRU) radioactive waste from the defense programs of the US Department of Energy (DOE). The US Environmental Protection Agency (EPA) is responsible for certifications and regulation of the WIPP facility for the radioactive components of the waste. The EPA has promulgated general radioactive waste disposal standards at 40 CFR Part 191. and WIPP-specific criteria to implement and interpret the generic disposal standards at 40 CFR Part 194. In October 1996. the DOE submitted its Compliance Certification Application (CCA) to the EPA tomore » demonstrate compliance with the disposal standards at Subparts B and C of 40 CFR Part 191. This paper summarizes the development of the overall legal framework for radioactive waste disposal at the WIPP, the parallel development of the WIPP performance assessment (PA), and how the EPA disposal standards and implementing criteria formed the basis for the CCA WIPP PA. The CCA resulted in a certification in May 1998 by the EPA of the WIPP'S compliance with the EPA's disposal standard, thus enabling the WIPP to begin radioactive waste disposal.« less

  12. Manufacturing demonstration of microbially mediated zinc sulfide nanoparticles in pilot-plant scale reactors.

    PubMed

    Moon, Ji-Won; Phelps, Tommy J; Fitzgerald, Curtis L; Lind, Randall F; Elkins, James G; Jang, Gyoung Gug; Joshi, Pooran C; Kidder, Michelle; Armstrong, Beth L; Watkins, Thomas R; Ivanov, Ilia N; Graham, David E

    2016-09-01

    The thermophilic anaerobic metal-reducing bacterium Thermoanaerobacter sp. X513 efficiently produces zinc sulfide (ZnS) nanoparticles (NPs) in laboratory-scale (≤ 24-L) reactors. To determine whether this process can be up-scaled and adapted for pilot-plant production while maintaining NP yield and quality, a series of pilot-plant scale experiments were performed using 100-L and 900-L reactors. Pasteurization and N2-sparging replaced autoclaving and boiling for deoxygenating media in the transition from small-scale to pilot plant reactors. Consecutive 100-L batches using new or recycled media produced ZnS NPs with highly reproducible ~2-nm average crystallite size (ACS) and yields of ~0.5 g L(-1), similar to the small-scale batches. The 900-L pilot plant reactor produced ~320 g ZnS without process optimization or replacement of used medium; this quantity would be sufficient to form a ZnS thin film with ~120 nm thickness over 0.5 m width × 13 km length. At all scales, the bacteria produced significant amounts of acetic, lactic, and formic acids, which could be neutralized by the controlled addition of sodium hydroxide without the use of an organic pH buffer, eliminating 98 % of the buffer chemical costs. The final NP products were characterized using XRD, ICP-OES, TEM, FTIR, PL, DLS, HPLC, and C/N analyses, which confirmed that the growth medium without organic buffer enhanced the ZnS NP properties by reducing carbon and nitrogen surface coatings and supporting better dispersivity with similar ACS.

  13. Evaluation of the School Breakfast Program Pilot Project: Findings from the First Year of Implementation. Nutrition Assistance Program Report Series.

    ERIC Educational Resources Information Center

    McLaughlin, Joan E.; Bernstein, Lawrence S.; Crepinsek, May Kay; Daft, Lynn M.; Murphy, J. Michael

    In 1998, Congress authorized implementation of a 3-year pilot breakfast program involving 4,300 students in elementary schools in 6 school districts representing a range of economic and demographic characteristics. The program began in the 2000-01 school year. This lengthy report presents the findings from the pilot's first year. The study had two…

  14. 10-MWe solar-thermal central-receiver pilot plant: collector subsystem foundation construction. Revision No. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-12-18

    Bid documents are provided for the construction of the collector subsystem foundation of the Barstow Solar Pilot Plant, including invitation to bid, bid form, representations and certifications, construction contract, and labor standards provisions of the Davis-Bacon Act. Instructions to bidders, general provisions and general conditions are included. Technical specifications are provided for the construction. (LEW)

  15. 77 FR 1920 - Second Amended Notice of Intent To Modify the Scope of the Surplus Plutonium Disposition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... suitable for MOX fuel fabrication is disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico... Waste Processing Facility at SRS or disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. On... are safety (criticality) limits on how much plutonium can be sent to the Defense Waste Processing...

  16. Nonthermal processing of orange juice using a pilot-plant scale supercritical carbon dioxide system with a gas-liquid metal contactor

    USDA-ARS?s Scientific Manuscript database

    To evaluate the effect of pilot-plant scale, non-thermal supercritical carbon dioxide (SCCO2) processing on the safety and the quality of orange juice (OJ), SCCO2 processed juice was compared with untreated fresh juice and equivalently thermal processed juice in terms of lethality. SCCO2 processing ...

  17. 78 FR 34380 - Biennial Determination of the Waste Isolation Pilot Plant's Compliance With Applicable Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ... documentation submitted by the U.S. Department of Energy (DOE) for the Waste Isolation Pilot Plant (WIPP), the U... requirements designated in Section 9(a)(1) of the WIPP Land Withdrawal Act, as amended. The Secretary of Energy... Act; (3) the Solid Waste Disposal Act; (4) the Safe Drinking Water Act; (5) the Toxic Substances...

  18. 75 FR 75532 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This notice announces and solicits comments on the fifth audit report for the...

  19. 76 FR 5237 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the fifth FHWA audit of the...

  20. 75 FR 39923 - Office of Postsecondary Education; Overview Information; Pilot Program for Course Material Rental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... DEPARTMENT OF EDUCATION Office of Postsecondary Education; Overview Information; Pilot Program for... education (IHEs) for pilot programs that expand the services of bookstores to provide the option for... CFR 75.105(b)(2)(iv), this priority is from section 803 of the Higher Education Opportunity Act (HEOA...

  1. 77 FR 26355 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the sixth FHWA audit of the...

  2. SPEEDIER Project. Preliminary Report on Social Studies Pilot Projects.

    ERIC Educational Resources Information Center

    Myers, Charles B.; And Others

    This preliminary report describes five social studies pilot programs in the counties of Dauphin, Lancaster, Lebanon, and York, Pennsylvania. It is expected that these pilot endeavors will affect educators in the counties served by SPEEDIER as follows: 1) increase understanding of the newer content, ideas, and strategies in the pilot programs; 2)…

  3. 75 FR 75526 - Self-Regulatory Organizations; BATS Exchange, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-03

    ... Change To Extend the Penny Pilot Program November 29, 2010. Pursuant to Section 19(b)(1) of the... Options'') to extend the Penny Pilot Program (``Penny Pilot'') in options classes in certain issues... BATS Options, including rules applicable to BATS Options' participation in the Penny Pilot, were...

  4. Designing for Scale: Reflections on Rolling Out Reading Improvement in Kenya and Liberia.

    PubMed

    Gove, Amber; Korda Poole, Medina; Piper, Benjamin

    2017-03-01

    Since 2008, the Ministries of Education in Liberia and Kenya have undertaken transitions from small-scale pilot programs to improve reading outcomes among primary learners to the large-scale implementation of reading interventions. The effects of the pilots on learning outcomes were significant, but questions remained regarding whether such large gains could be sustained at scale. In this article, the authors dissect the Liberian and Kenyan experiences with implementing large-scale reading programs, documenting the critical components and conditions of the program designs that affected the likelihood of successfully transitioning from pilot to scale. They also review the design, deployment, and effectiveness of each pilot program and the scale, design, duration, enabling conditions, and initial effectiveness results of the scaled programs in each country. The implications of these results for the design of both pilot and large-scale reading programs are discussed in light of the experiences of both the Liberian and Kenyan programs. © 2017 Wiley Periodicals, Inc.

  5. Attenuation of municipal landfill leachate through land treatment

    PubMed Central

    2014-01-01

    The treatment of municipal landfill’s leachate is considered as one of the most significant environmental issues. In this study a laboratory experiment was conducted through land treatment, achieving an efficient and economical method by using Vetiver plant. Moreover, the effects of land treatment of leachate of municipal landfills on the natural reduction of organic and inorganic contaminants in the leachate after the pre-treatment in the Aradkouh disposal center are invested. Three pilots including the under-investigation region’s soil planted by Vetiver plant, the region’s intact soil pilot and the artificial composition of the region’s soil including the natural region’s soil, sand, and rock stone are used. The leachate, having passed its initial treatment, passed through the soil and to the pilot. It was collected in the end of the pilots and its organic and inorganic contaminants were measured. However, the land treatment of leachate was conducted in a slow rate at various speeds. According to the results, in order to remove COD, BOD5, TDS, TSS, TOC the best result was obtained in the region’s soil planted with Vetiver plant and at the speed of 0.2 ml per minute which resulted 99.1%, 99.7%, 52.4%, 98.8%, 94.9% removal efficiencies, respectively. It also can be concluded that the higher the organic rate load is, the lower the efficiency of the removal would be. In addition, EC & pH were measured and the best result was obtained in the region’s soil planted with Vetiver plant and at the speed of 0.2 ml/min. PMID:24397862

  6. Techno-economic assessment of a multi-effect distillation plant installed for the production of irrigation water in Arica (Chile).

    PubMed

    Palenzuela, P; Miralles-Cuevas, S; Cabrera-Reina, A; Cornejo-Ponce, L

    2018-06-22

    In the context of a regional Chilean project (FIC Taltape project, BIP code 30158422-0), a multi-effect distillation (MED) pilot plant has been built and installed in a small community in the north of Chile (Taltape, Arica) in order to supply treated water for agricultural and domestic purposes. The aim of this paper is to assess the techno-economic feasibility of this system for supplying water with the required quality to the population. The characterization of the feed water and the effluents from the MED pilot plant (distillate and brine), obtained during five months of operation, has been firstly performed. Then, the prediction of the operation of the water treatment system with solar energy has been carried out using a typical meteorological year and the design of a static solar field that cover the thermal energy needs of the water treatment plant. The annual simulations of the MED pilot plant operating with solar energy showed that the water needs can be mostly covered using a static solar thermal field with a total area of 113.2 m 2 , which would generate roughly 46% of the total heat required by the water treatment plant. The technical analysis has been completed with an exhaustive economic assessment. The specific water costs have been determined for the MED pilot plant and the scale factor when the productivity is increased up to 5000 m 3 /day has been evaluated. The cost of distillated water produced by the MED plant varied from 15.0 USD$/m 3 for the 10 m 3 /day production capacity to 1.25 USD$/m 3 when this variable is increased to 5000 m 3 /day. Copyright © 2018 Elsevier B.V. All rights reserved.

  7. Extraction of azadirachtin A from neem seed kernels by supercritical fluid and its evaluation by HPLC and LC/MS.

    PubMed

    Ambrosino, P; Fresa, R; Fogliano, V; Monti, S M; Ritieni, A

    1999-12-01

    A new supercritical extraction methodology was applied to extract azadirachtin A (AZA-A) from neem seed kernels. Supercritical and liquid carbon dioxide (CO(2)) were used as extractive agents in a three-separation-stage supercritical pilot plant. Subcritical conditions were tested too. Comparisons were carried out by calculating the efficiency of the pilot plant with respect to the milligrams per kilogram of seeds (ms/mo) of AZA-A extracted. The most convenient extraction was gained using an ms/mo ratio of 119 rather than 64. For supercritical extraction, a separation of cuticular waxes from oil was set up in the pilot plant. HPLC and electrospray mass spectroscopy were used to monitor the yield of AZA-A extraction.

  8. Extension of expiration date for temporary pilot program setting the time and place for a hearing before an administrative law judge. Final rule.

    PubMed

    2014-07-18

    We are extending for one year our pilot program that authorizes the agency to set the time and place for a hearing before an administrative law judge (ALJ). Extending the pilot program continues our commitment to improve the efficiency of our hearing process and provide accurate, high-quality decisions for claimants. The current pilot program will expire on August 9, 2014. In this final rule, we are extending the expiration date to August 10, 2015. We are making no other substantive changes.

  9. Professional pilots' views of alcohol use in aviation and the effectiveness of employee-assistance programs.

    PubMed

    Ross, S M; Ross, L E

    1995-01-01

    Pilots holding the Airline Transport Pilot certificate were surveyed about the seriousness of the alcohol problem in various areas of aviation and about the importance of a number of possible reasons why a pilot might drink and fly. They also rated a number of actions in terms of their potential effectiveness for reducing inappropriate alcohol use, and they evaluated a number of characteristics of employee-assistance programs. Respondents judged employee-assistance programs to be the best way to reduce problem drinking. They also identified areas in which currently available employee-assistance programs could be improved.

  10. German central solar heating plants with seasonal heat storage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bauer, D.; Marx, R.; Nussbicker-Lux, J.

    2010-04-15

    Central solar heating plants contribute to the reduction of CO{sub 2}-emissions and global warming. The combination of central solar heating plants with seasonal heat storage enables high solar fractions of 50% and more. Several pilot central solar heating plants with seasonal heat storage (CSHPSS) built in Germany since 1996 have proven the appropriate operation of these systems and confirmed the high solar fractions. Four different types of seasonal thermal energy stores have been developed, tested and monitored under realistic operation conditions: Hot-water thermal energy store (e.g. in Friedrichshafen), gravel-water thermal energy store (e.g. in Steinfurt-Borghorst), borehole thermal energy store (inmore » Neckarsulm) and aquifer thermal energy store (in Rostock). In this paper, measured heat balances of several German CSHPSS are presented. The different types of thermal energy stores and the affiliated central solar heating plants and district heating systems are described. Their operational characteristics are compared using measured data gained from an extensive monitoring program. Thus long-term operational experiences such as the influence of net return temperatures are shown. (author)« less

  11. Project Columbiad: Mission to the Moon. Book 1: Executive Summary. Volume 1: Mission trade studies and requirements. Volume 2: Subsystem trade studies and selection

    NASA Technical Reports Server (NTRS)

    Clarke, Michael; Denecke, Johan; Garber, Suzanne; Kader, Beth; Liu, Celia; Weintraub, Ben; Cazeau, Patrick; Goetz, John; Haughwout, James; Larson, Erik

    1992-01-01

    In response to the Report of the Advisory Committee on the future of the U.S. Space Program and a request from NASA's Exploration Office, the MIT Hunsaker Aerospace Corporation (HAC) conducted a feasibility study, known as Project Columbiad, on reestablishing human presence on the Moon before the year 2000. The mission criteria established were to transport a four person crew to the lunar surface at any latitude and back to Earth with a 14-28 day stay on the lunar surface. Safety followed by cost of the Columbiad Mission were the top level priorities of HAC. The resulting design has a precursor mission that emplaces the required surface payloads before the piloted mission arrives. Both the precursor and piloted missions require two National Launch System (NLS) launches. Both the precursor and piloted mission have an Earth orbit rendezvous (EOR) with a direct transit to the Moon post-EOR. The piloted mission returns to Earth via a direct transit. Included among the surface payloads preemplaced are a habitat, solar power plant (including fuel cells for the lunar night), lunar rover, and mechanisms used to cover the habitat with regolith (lunar soil) in order to protect the crew members from severe solar flare radiation.

  12. Geothermal research and development program of the US Atomic Energy Commission

    NASA Technical Reports Server (NTRS)

    Werner, L. B.

    1974-01-01

    Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

  13. The Geothermal Potential, Current and Opportunity in Taiwan

    NASA Astrophysics Data System (ADS)

    Song, Sheng-Rong

    2016-04-01

    Located in the west Pacific Rim of Fire, Taiwan possesses rich geothermal resources due to volcanic activities and rapid uplifting of plate collision. Based on available data prior to 1980, Taiwan may have about 1 GWe of potential shallow geothermal energy, which is less than 3% of the national gross power generation. A 3-Mw pilot power plant, therefore, was constructed in 1981 and terminated in 1993 in the Chingshui geothermal field of Ilan, northeastern Taiwan. Recently, one of the National Science & Technology Program (NSTP) projects has been conducting research and reevaluating the island-wide deep geothermal energy. Four hot potential sites have been recognized. They are: (1) Tatun Volcano Group of northern Taiwan; (2) I-Lan Plain of NE Taiwan; (3) Lu-Shan area of Central Taiwan; and (4) Hua-Tung area of eastern Taiwan. We found that the geothermal resource in Taiwan may be as high as 160 GWe, with 33.6 GWe of exploitable geothermal energy. There are no any commercial geothermal power plants until now in Taiwan, although the potential is great. However, geothermal energy has been listed as one of major tasks of National Energy Program, Phase II (NEP-II) in Taiwan. We will conduct more detailed geothermal energy surveys on some proposed hot sites and to construct an EGS pilot geothermal plant with 1 MWe capability in a few years. Currently, there are three nuclear power plants, named No. 1, 2 & 3, in operations, which produce 16.5% gross generation of electricity and one (No. 4) is under construction, but is stopped and sealed now in Taiwan. Furthermore, the life-span of 40-year operation for those three power plants will be close-at hand and retire in 2018-2019, 2021-2023 and 2024-2025, respectively. Therefore, to find alternative energy sources, especially on the clean, renewable and sustainable ones for generating electricity are emergent and important for Taiwan's government in next few years. Among various energy sources, geothermal energy can be as base-load electricity and offers an opportunity for a country with naturally free-resource and less dependence on fossil fuel. However, development of geothermal energy has been stopped for more than 30 years, and currently no working geothermal power plant existed in Taiwan. To jump-start the geothermal exploitation rather than solely rely on knowledge, we also need to introduce the techniques from outside of this country.

  14. Satellite Power Systems (SPS) concept definition study exhibit C. Volume 3: Experimental verification definition

    NASA Technical Reports Server (NTRS)

    1979-01-01

    An environmentally oriented microwave technology exploratory research program aimed at reducing the uncertainty associated with microwave power system critical technical issues is described. Topics discussed include: (1) Solar Power Satellite System (SPS) development plan elements; (2) critical technology issues related to the SPS preliminary reference configuration; (3) pilot plant to demonstrate commercial viability of the SPS system; and (4) research areas required to demonstrate feasibility of the SPS system. Progress in the development of advanced GaAs solar cells is reported along with a power distribution subsystem.

  15. 76 FR 49527 - Joint Motor Carrier Safety Advisory Committee and Medical Review Board Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... Task 11-03, regarding the Agency's Cross Border Trucking Pilot Program, will meet. Copies of all MCSAC... Trucking Pilot Program Task The MCSAC Subcommittee will continue its work on Task 11-03 concerning the... a meeting of the Cross-Border Trucking Pilot Program subcommittee. All three days of the meeting...

  16. 78 FR 39365 - Self-Regulatory Organizations; BOX Options Exchange LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ..., offering detailed data from, and analysis of, the PIP Pilot Program. Specifically, the Exchange believes... further analysis of the PIP Pilot Program and a determination of how the PIP Pilot Program shall be structured in the future. 2. Statutory Basis The Exchange believes that the proposal is consistent with the...

  17. An Assessment of Teacher Education Students' Perceptions and Satisfaction of Their Learning Experiences in a Summer Pilot Program

    ERIC Educational Resources Information Center

    Hicks, Terence; Lewis, Leontye; Munn, Geraldine; Jordon, Earlyn; Charles, Kelly

    2010-01-01

    This study assessed teacher education students' perceptions and satisfaction of their learning experiences concerning an accelerated summer pilot program. In addition, the study provided information on the impact and teaching effectiveness of the accelerated teacher education summer pilot program on participating students. Results from this study…

  18. 49 CFR 381.515 - May the FMCSA remove approved participants from a pilot program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false May the FMCSA remove approved participants from a... § 381.515 May the FMCSA remove approved participants from a pilot program? The Administrator will... with the terms and conditions of the pilot program, or if continued participation is inconsistent with...

  19. 78 FR 973 - Self-Regulatory Organizations; Miami International Securities Exchange LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... Effectiveness of Proposed Rule Change To Extend the Penny Pilot Program December 31, 2012. Pursuant to Section... certain options in pennies (the ``Penny Pilot Program'') and to adopt a procedure for replacing in the Penny Pilot Program option classes that have been delisted. The text of the proposed rule change is...

  20. 78 FR 38745 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-27

    ... Rule Change To Extend the Penny Pilot Program June 21, 2013. Pursuant to Section 19(b)(1) of the... options in pennies (``Penny Pilot Program'') and to revise the provision describing how the Exchange specifies which option classes trade in the Penny Pilot Program. The text of the proposed rule change is...

  1. 77 FR 40121 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... Rule Change To Extend the Penny Pilot Program June 29, 2012. Pursuant to Section 19(b)(1) \\1\\ of the... program to quote and to trade certain options in pennies (``Penny Pilot Program''). The text of the... penny pilot issues that have been delisted with the next most actively traded multiply listed options...

  2. 76 FR 79231 - Self-Regulatory Organizations; NASDAQ OMX BX, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-21

    ... Extend the Penny Pilot Program December 15, 2011. Pursuant to Section 19(b)(1) of the Securities Exchange... Chapter V, Section 33 (Penny Pilot Program) of the Rules of the Boston Options Exchange Group, LLC (``BOX... penny increments on BOX (``Penny Pilot Program''). II. Self-Regulatory Organization's Statement of the...

  3. 78 FR 73909 - Self-Regulatory Organizations; Miami International Securities Exchange LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-09

    ... Effectiveness of Proposed Rule Change To Extend the Penny Pilot Program December 3, 2013. Pursuant to Section 19... certain options in pennies (the ``Penny Pilot Program''). The text of the proposed rule change is... quoting and trading of certain option classes in penny increments (the ``Penny Pilot Program'' or...

  4. 78 FR 37856 - Self-Regulatory Organizations; Miami International Securities Exchange LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... Effectiveness of Proposed Rule Change to Extend the Penny Pilot Program June 18, 2013. Pursuant to Section 19(b... Policies .01 to extend the pilot program for the quoting and trading of certain options in pennies (the ``Penny Pilot Program'') and to revise the provision describing how the Exchange specifies which option...

  5. 78 FR 67385 - 30-Day Notice of Proposed Information Collection: FHA PowerSaver Pilot Program (Title I Property...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... Information Collection: FHA PowerSaver Pilot Program (Title I Property Improvement and Title II--203(k... days was published on August 9, 2013. A. Overview of Information Collection Title of Information Collection: FHA PowerSaver Pilot Program (Title I Property Improvement and Title II--203(k) Rehabilitation...

  6. 78 FR 48709 - 60-Day Notice of Proposed Information Collection: FHA PowerSaver Pilot Program-Title I Property...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Information Collection: FHA PowerSaver Pilot Program--Title I Property Improvement and Title II--203(k... collection described in Section A. A. Overview of Information Collection Title of Information Collection: FHA PowerSaver Pilot Program Title I Property Improvement and Title II--203(k) Rehabilitation Mortgage...

  7. 40 CFR 93.129 - Special exemptions from conformity requirements for pilot program areas.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with the conformity requirements of the pilot area's implementation plan revision for § 51.390 of this chapter and all other requirements in 40 CFR parts 51 and 93 that are not covered by the pilot area's... requirements for pilot program areas. 93.129 Section 93.129 Protection of Environment ENVIRONMENTAL PROTECTION...

  8. 40 CFR 93.129 - Special exemptions from conformity requirements for pilot program areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with the conformity requirements of the pilot area's implementation plan revision for § 51.390 of this chapter and all other requirements in 40 CFR parts 51 and 93 that are not covered by the pilot area's... requirements for pilot program areas. 93.129 Section 93.129 Protection of Environment ENVIRONMENTAL PROTECTION...

  9. 40 CFR 93.129 - Special exemptions from conformity requirements for pilot program areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... with the conformity requirements of the pilot area's implementation plan revision for § 51.390 of this chapter and all other requirements in 40 CFR parts 51 and 93 that are not covered by the pilot area's... requirements for pilot program areas. 93.129 Section 93.129 Protection of Environment ENVIRONMENTAL PROTECTION...

  10. 40 CFR 93.129 - Special exemptions from conformity requirements for pilot program areas.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with the conformity requirements of the pilot area's implementation plan revision for § 51.390 of this chapter and all other requirements in 40 CFR parts 51 and 93 that are not covered by the pilot area's... requirements for pilot program areas. 93.129 Section 93.129 Protection of Environment ENVIRONMENTAL PROTECTION...

  11. 40 CFR 93.129 - Special exemptions from conformity requirements for pilot program areas.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with the conformity requirements of the pilot area's implementation plan revision for § 51.390 of this chapter and all other requirements in 40 CFR parts 51 and 93 that are not covered by the pilot area's... requirements for pilot program areas. 93.129 Section 93.129 Protection of Environment ENVIRONMENTAL PROTECTION...

  12. 77 FR 77176 - Self-Regulatory Organizations; BATS Exchange, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... Change To Extend the Penny Pilot Program December 21, 2012. Pursuant to Section 19(b)(1) \\1\\ of the... Options'') to extend through June 30, 2013, the Penny Pilot Program (``Penny Pilot'') in options classes... Options, including rules applicable to BATS Options' participation in the Penny Pilot, were approved on...

  13. 78 FR 136 - Self-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ... Proposed Rule Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement of Penny... VI, Section 5 (Minimum Increments) of the rules of NOM to: extend through June 30, 2013, the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''), and to change the...

  14. 78 FR 37858 - Self-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... Proposed Rule Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement of Penny... NASDAQ Options Market (``NOM'') to extend through December 31, 2013, the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''), and to change the date when delisted classes may...

  15. 78 FR 77530 - Self-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... Proposed Rule Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement of Penny... the rules of the NASDAQ Options Market (``NOM'') to extend through June 30, 2014, the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''), and to change the date when...

  16. 78 FR 77177 - Self-Regulatory Organizations; BATS Exchange, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ... Change To Extend the Penny Pilot Program December 16, 2013. Pursuant to Section 19(b)(1) of the... through June 30, 2014, the Penny Pilot Program (``Penny Pilot'') in options classes in certain issues... rules applicable to BATS Options' participation in the Penny Pilot, were approved on January 26, 2010...

  17. 77 FR 40127 - Self-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... Proposed Rule Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement of Penny... amend Chapter VI, Section 5 (Minimum Increments) to: Extend through December 31, 2012, the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''); and provide for or allow...

  18. Sequential Design of Experiments to Maximize Learning from Carbon Capture Pilot Plant Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soepyan, Frits B.; Morgan, Joshua C.; Omell, Benjamin P.

    Pilot plant test campaigns can be expensive and time-consuming. Therefore, it is of interest to maximize the amount of learning and the efficiency of the test campaign given the limited number of experiments that can be conducted. This work investigates the use of sequential design of experiments (SDOE) to overcome these challenges by demonstrating its usefulness for a recent solvent-based CO2 capture plant test campaign. Unlike traditional design of experiments methods, SDOE regularly uses information from ongoing experiments to determine the optimum locations in the design space for subsequent runs within the same experiment. However, there are challenges that needmore » to be addressed, including reducing the high computational burden to efficiently update the model, and the need to incorporate the methodology into a computational tool. We address these challenges by applying SDOE in combination with a software tool, the Framework for Optimization, Quantification of Uncertainty and Surrogates (FOQUS) (Miller et al., 2014a, 2016, 2017). The results of applying SDOE on a pilot plant test campaign for CO2 capture suggests that relative to traditional design of experiments methods, SDOE can more effectively reduce the uncertainty of the model, thus decreasing technical risk. Future work includes integrating SDOE into FOQUS and using SDOE to support additional large-scale pilot plant test campaigns.« less

  19. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alexander Fridman

    2005-06-01

    This DOE project DE-FC36-04GO14052 ''Plasma Pilot Plant Test for Treating VOC Emissions from Wood Products Plants'' was conducted by Drexel University in cooperation with Georgia-Pacific (G-P) and Kurchatov Institute (KI). The objective of this project was to test the Plasma Pilot Plant capabilities in wood industry. The final goal of the project was to replace the current state-of-the-art, regenerative thermal oxidation (RTO) technology by Low-Temperature Plasma Technology (LTPT) in paper and wood industry for Volatile Organic Components (VOC) destruction in High Volume Low Concentration (HVLC) vent emissions. MetPro Corporation joined the team as an industrial partner from the environmental controlmore » business and a potential leader for commercialization. Concurrent Technology Corporation (CTC) has a separate contract with DOE for this technology evaluation. They prepared questionnaires for comparison of this technology and RTO, and made this comparison. These data are presented in this report along with the description of the technology itself. Experiments with the pilot plant were performed with average plasma power up to 3.6 kW. Different design of the laboratory and pilot plant pulsed coronas, as well as different analytical methods revealed many new peculiarities of the VOC abatement process. The work reported herein describes the experimental results for the VOCs removal efficiency with respect to energy consumption, residence time, water effect and initial concentration.« less

  20. Sono-photo-degradation of carbamazepine in a thin falling film reactor: Operation costs in pilot plant.

    PubMed

    Expósito, A J; Patterson, D A; Monteagudo, J M; Durán, A

    2017-01-01

    The photo-Fenton degradation of carbamazepine (CBZ) assisted with ultrasound radiation (US/UV/H 2 O 2 /Fe) was tested in a lab thin film reactor allowing high TOC removals (89% in 35min). The synergism between the UV process and the sonolytic one was quantified as 55.2%. To test the applicability of this reactor for industrial purposes, the sono-photo-degradation of CBZ was also tested in a thin film pilot plant reactor and compared with a 28L UV-C conventional pilot plant and with a solar Collector Parabolic Compound (CPC). At a pilot plant scale, a US/UV/H 2 O 2 /Fe process reaching 60% of mineralization would cost 2.1 and 3.8€/m 3 for the conventional and thin film plant respectively. The use of ultrasound (US) produces an extra generation of hydroxyl radicals, thus increasing the mineralization rate. In the solar process, electric consumption accounts for a maximum of 33% of total costs. Thus, for a TOC removal of 80%, the cost of this treatment is about 1.36€/m 3 . However, the efficiency of the solar installation decreases in cloudy days and cannot be used during night, so that a limited flow rate can be treated. Copyright © 2016 Elsevier B.V. All rights reserved.

  1. WIPP conceptual design report. Addendum A. Design calculations for Waste Isolation Pilot Plant (WIPP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1977-04-01

    The design calculations for the Waste Isolation Pilot Plant (WIPP) are presented. The following categories are discussed: general nuclear calculations; radwaste calculations; structural calculations; mechanical calculations; civil calculations; electrical calculations; TRU waste surface facility time and motion analysis; shaft sinking procedures; hoist time and motion studies; mining system analysis; mine ventilation calculations; mine structural analysis; and miscellaneous underground calculations.

  2. 76 FR 31611 - Biennial Determination of the Waste Isolation Pilot Plant's Compliance with Applicable Federal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-01

    ... documentation submitted by the U.S. Department of Energy (DOE) for the Waste Isolation Pilot Plant (WIPP), the U... requirements designated in Section 9(a)(1) of the WIPP Land Withdrawal Act, as amended. The Secretary of Energy...) the Clean Air Act; (3) the Solid Waste Disposal Act; (4) the Safe Drinking Water Act; (5) the Toxic...

  3. Receiver subsystem analysis report (RADL Item 4-1). The 10-MWe solar thermal central-receiver pilot plant: Solar-facilities design integration

    NASA Astrophysics Data System (ADS)

    1982-04-01

    The results of thermal hydraulic, design for the stress analyses which are required to demonstrate that the receiver design for the Barstow Solar Pilot Plant satisfies the general design and performance requirements during the plant's design life are presented. Recommendations are made for receiver operation. The analyses are limited to receiver subsystem major structural parts (primary tower, receiver unit core support structure), pressure parts (absorber panels, feedwater, condensate and steam piping/components, flash tank, and steam mainfold) and shielding.

  4. Case studies of energy efficiency financing in the original five pilot states, 1993-1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farhar, B C; Collins, N E; Walsh, R W

    1997-05-01

    The purpose of this report is to document progress in state-level programs in energy efficiency financing programs that are linked with home energy rating systems. Case studies are presented of programs in five states using a federal pilot program to amortize the costs of home energy improvements. The case studies present background information, describe the states` program, list preliminary evaluation data and findings, and discuss problems and solution encountered in the programs. A comparison of experiences in pilot states will be used to provide guidelines for program implementers, federal agencies, and Congress. 5 refs.

  5. Pilot-optimal augmentation synthesis

    NASA Technical Reports Server (NTRS)

    Schmidt, D. K.

    1978-01-01

    An augmentation synthesis method usable in the absence of quantitative handling qualities specifications, and yet explicitly including design objectives based on pilot-rating concepts, is presented. The algorithm involves the unique approach of simultaneously solving for the stability augmentation system (SAS) gains, pilot equalization and pilot rating prediction via optimal control techniques. Simultaneous solution is required in this case since the pilot model (gains, etc.) depends upon the augmented plant dynamics, and the augmentation is obviously not a priori known. Another special feature is the use of the pilot's objective function (from which the pilot model evolves) to design the SAS.

  6. EMPACT: THE LAS VEGAS INTERAGENCY PILOT PROGRAM

    EPA Science Inventory

    ENPACT: The Las Vegas Interagency Pilot Project

    The Las Vegas Interagency Pilot Project of the EMPACT program has involved eleven efforts. These efforts are described in brief on the poster presentation. They include: Las Vegas Environmental Monitoring Inventory, the Qual...

  7. Light Water Reactor Sustainability Program: Digital Technology Business Case Methodology Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, Ken; Lawrie, Sean; Hart, Adam

    The Department of Energy’s (DOE’s) Light Water Reactor Sustainability Program aims to develop and deploy technologies that will make the existing U.S. nuclear fleet more efficient and competitive. The program has developed a standard methodology for determining the impact of new technologies in order to assist nuclear power plant (NPP) operators in building sound business cases. The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies Pathway is part of the DOE’s Light Water Reactor Sustainability (LWRS) Program. It conducts targeted research and development (R&D) to address aging and reliability concerns with the legacy instrumentation and control and related information systemsmore » of the U.S. operating light water reactor (LWR) fleet. This work involves two major goals: (1) to ensure that legacy analog II&C systems are not life-limiting issues for the LWR fleet and (2) to implement digital II&C technology in a manner that enables broad innovation and business improvement in the NPP operating model. Resolving long-term operational concerns with the II&C systems contributes to the long-term sustainability of the LWR fleet, which is vital to the nation’s energy and environmental security. The II&C Pathway is conducting a series of pilot projects that enable the development and deployment of new II&C technologies in existing nuclear plants. Through the LWRS program, individual utilities and plants are able to participate in these projects or otherwise leverage the results of projects conducted at demonstration plants. Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) addresses the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the "benefits" side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology.« less

  8. Repellent Plants Provide Affordable Natural Screening to Prevent Mosquito House Entry in Tropical Rural Settings—Results from a Pilot Efficacy Study

    PubMed Central

    Mng'ong'o, Frank C.; Sambali, Joseph J.; Sabas, Eustachkius; Rubanga, Justine; Magoma, Jaka; Ntamatungiro, Alex J.; Turner, Elizabeth L.; Nyogea, Daniel; Ensink, Jeroen H. J.; Moore, Sarah J.

    2011-01-01

    Sustained malaria control is underway using a combination of vector control, prompt diagnosis and treatment of malaria cases. Progress is excellent, but for long-term control, low-cost, sustainable tools that supplement existing control programs are needed. Conventional vector control tools such as indoor residual spraying and house screening are highly effective, but difficult to deliver in rural areas. Therefore, an additional means of reducing mosquito house entry was evaluated: the screening of mosquito house entry points by planting the tall and densely foliated repellent plant Lantana camara L. around houses. A pilot efficacy study was performed in Kagera Region, Tanzania in an area of high seasonal malaria transmission, where consenting families within the study village planted L. camara (Lantana) around their homes and were responsible for maintaining the plants. Questionnaire data on house design, socioeconomic status, malaria prevention knowledge, attitude and practices was collected from 231 houses with Lantana planted around them 90 houses without repellent plants. Mosquitoes were collected using CDC Light Traps between September 2008 and July 2009. Data were analysed with generalised negative binomial regression, controlling for the effect of sampling period. Indoor catches of mosquitoes in houses with Lantana were compared using the Incidence Rate Ratio (IRR) relative to houses without plants in an adjusted analysis. There were 56% fewer Anopheles gambiae s.s. (IRR 0.44, 95% CI 0.28–0.68, p<0.0001); 83% fewer Anopheles funestus s.s. (IRR 0.17, 95% CI 0.09–0.32, p<0.0001), and 50% fewer mosquitoes of any kind (IRR 0.50, 95% CI 0.38–0.67, p<0.0001) in houses with Lantana relative to controls. House screening using Lantana reduced indoor densities of malaria vectors and nuisance mosquitoes with broad community acceptance. Providing sufficient plants for one home costs US $1.50 including maintenance and labour costs, (30 cents per person). L. camara mode of action and suitability for mosquito control is discussed. PMID:22022471

  9. Repellent plants provide affordable natural screening to prevent mosquito house entry in tropical rural settings--results from a pilot efficacy study.

    PubMed

    Mng'ong'o, Frank C; Sambali, Joseph J; Sabas, Eustachkius; Rubanga, Justine; Magoma, Jaka; Ntamatungiro, Alex J; Turner, Elizabeth L; Nyogea, Daniel; Ensink, Jeroen H J; Moore, Sarah J

    2011-01-01

    Sustained malaria control is underway using a combination of vector control, prompt diagnosis and treatment of malaria cases. Progress is excellent, but for long-term control, low-cost, sustainable tools that supplement existing control programs are needed. Conventional vector control tools such as indoor residual spraying and house screening are highly effective, but difficult to deliver in rural areas. Therefore, an additional means of reducing mosquito house entry was evaluated: the screening of mosquito house entry points by planting the tall and densely foliated repellent plant Lantana camara L. around houses. A pilot efficacy study was performed in Kagera Region, Tanzania in an area of high seasonal malaria transmission, where consenting families within the study village planted L. camara (Lantana) around their homes and were responsible for maintaining the plants. Questionnaire data on house design, socioeconomic status, malaria prevention knowledge, attitude and practices was collected from 231 houses with Lantana planted around them 90 houses without repellent plants. Mosquitoes were collected using CDC Light Traps between September 2008 and July 2009. Data were analysed with generalised negative binomial regression, controlling for the effect of sampling period. Indoor catches of mosquitoes in houses with Lantana were compared using the Incidence Rate Ratio (IRR) relative to houses without plants in an adjusted analysis. There were 56% fewer Anopheles gambiae s.s. (IRR 0.44, 95% CI 0.28-0.68, p<0.0001); 83% fewer Anopheles funestus s.s. (IRR 0.17, 95% CI 0.09-0.32, p<0.0001), and 50% fewer mosquitoes of any kind (IRR 0.50, 95% CI 0.38-0.67, p<0.0001) in houses with Lantana relative to controls. House screening using Lantana reduced indoor densities of malaria vectors and nuisance mosquitoes with broad community acceptance. Providing sufficient plants for one home costs US $1.50 including maintenance and labour costs, (30 cents per person). L. camara mode of action and suitability for mosquito control is discussed.

  10. 76 FR 81002 - Self-Regulatory Organizations; C2 Options Exchange, Incorporated; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... until June 30, 2012. C2 believes that extending the Pilot Program will allow for further analysis of the Pilot Program and a determination of how the Pilot Program should be structured in the future. During... of the six-month analysis. Thus, a replacement class to be added on the second trading following...

  11. Brief Report: Piloting the Positive Life Changes (PLC) Program for At-Risk Adolescents

    ERIC Educational Resources Information Center

    Williamson, Ariel A.; Dierkhising, Carly B.; Guerra, Nancy G.

    2013-01-01

    The purpose of this study was to pilot the Positive Life Changes (PLC) program, a comprehensive cognitive-behavioral intervention for at-risk adolescents that aims to promote social competencies and to prevent aggression. The program was piloted in 4 intervention groups with a sample of 31 self-referred adolescents (M age 15.64) attending an…

  12. 75 FR 77019 - Self-Regulatory Organizations; C2 Options Exchange, Incorporated; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... Rule Change Related to the Penny Pilot Program December 3, 2010. Pursuant to Section 19(b)(1) of the... relating to the Penny Pilot Program. The text of the proposed rule change is available on the Exchange's... language regarding the Penny Pilot Program tracks that of the language of Chicago Board Options Exchange...

  13. 78 FR 37854 - Self-Regulatory Organizations; BOX Options Exchange LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... To Extend the Penny Pilot Program and Amend Rule 7050 June 18, 2013. Pursuant to Section 19(b)(1) of... that permits certain classes to be quoted in penny increments (``Penny Pilot Program'') and to remove... extend the effective time period of the Penny Pilot Program that is currently scheduled to expire on June...

  14. 75 FR 75713 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ... Effectiveness of Proposed Rule Change Related to the Penny Pilot Program November 29, 2010. Pursuant to Section... proposing to amend its rules relating to the Penny Pilot Program. The text of the proposed rule change is... 1. Purpose The Penny Pilot Program is scheduled to expire on December 31, 2010. CBOE proposes to...

  15. 78 FR 974 - Self-Regulatory Organizations; C2 Options Exchange, Incorporated; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... Change Relating to the Exchange Penny Pilot Program December 31, 2012. Pursuant to Section 19(b)(1) \\1... Penny Pilot Program. The text of the proposed rule change is provided below. [(additions are italicized... increments for bids and offers for all series of the option classes participating in the Penny Pilot Program...

  16. 77 FR 40123 - Self-Regulatory Organizations; BOX Options Exchange, LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... Rule Change To Extend the Penny Pilot Program June 29, 2012. Pursuant to Section 19(b)(1) \\1\\ of the... Proposed Rule Change The Exchange proposes to amend Rule 7260 (Penny Pilot Program) to extend, through December 31, 2012, the pilot program that permits certain classes to be quoted in penny increments (``Penny...

  17. 75 FR 43596 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... Improvement Mechanism Until July 18, 2011 July 16, 2010. Pursuant to Section 19(b)(1) of the Securities... extended the pilot program until July 18, 2007.\\7\\ In July 2007, the Exchange extended the pilot program until July 18, 2008.\\8\\ In July 2008, the Exchange extended the pilot program until July 18, 2009.\\9\\ In...

  18. Extension of Effective Date for Temporary Pilot Program Setting the Time and Place for a Hearing Before an Administrative Law Judge. Final rule.

    PubMed

    2015-07-02

    We are extending for one year our pilot program that authorizes the agency to set the time and place for a hearing before an administrative law judge (ALJ). Extending of the pilot program continues our commitment to improve the efficiency of our hearing process and to maintain a hearing process that results in accurate, high-quality decisions for claimants. The current pilot program will expire on August 10, 2015. In this final rule, we are extending the effective date to August 12, 2016. We are making no other substantive changes.

  19. 78 FR 77528 - Self-Regulatory Organizations; NASDAQ OMX BX, Inc.; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... Relating to Extension of the Exchange's Penny Pilot Program December 17, 2013. Pursuant to Section 19(b)(1... Increments) to: extend through June 30, 2014, the Penny Pilot Program in options classes in certain issues (``Penny Pilot'' or ``Pilot''), and to change the date when delisted classes may be replaced in the Penny...

  20. Portable pilot plant for evaluating marine biofouling growth and control in heat exchangers-condensers.

    PubMed

    Casanueva, J F; Sánchez, J; García-Morales, J L; Casanueva-Robles, T; López, J A; Portela, J R; Nebot, E; Sales, D

    2003-01-01

    Biofouling frequently involves a serious impediment to achieving optimum operating conditions in heat exchangers-condensers. The economic coat and energy losses associated with this phenomenon are significant and the environmental impact of biocides must satisfy stringent regulations. A portable pilot plant has been designed in order to carry out in-situ experimental study as biofilm is formed under thermal and hydrodynamically controlled conditions. The pilot plant has an automatic monitoring, control and data acquisition system, which automatically processes data from indirect measure of fouling in terms of increased fluid frictional and heat transfer resistances. A particular method is used and proposed for direct measuring and biofilm characterization. Once we know the actual film thickness, we can calculate the effective thermal conductivity of the layer by using the appropriate heat transfer equations.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Menon, R.; Grames, L.M.

    Pilot Carrousel testing was conducted for about three months on wastewaters generated at a major potato processing facility in 1993. The testing focused toward removal of BOD, NH{sub 3} and NO{sub 3}, and Total-P. After five-six weeks that it took for the system to reach steady state operation, the pilot plant was able to treat the wastewaters quite well. Effluent BOD{sub 5} and TKN values were less than 8 and 4 mg/L, respectively, during the second half of testing. Total-P in the effluent was less than 10 mg/L, although this step was not optimized. Based on the pilot testing, amore » full-scale Carrousel activated sludge plant was designed and commissioned in 1994. This plant is currently treating all the wastewaters from the facility and performing contaminant removals at a very high level.« less

  2. Benchmarking transportation logistics practices for effective system planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thrower, A.W.; Dravo, A.N.; Keister, M.

    2007-07-01

    This paper presents preliminary findings of an Office of Civilian Radioactive Waste Management (OCRWM) benchmarking project to identify best practices for logistics enterprises. The results will help OCRWM's Office of Logistics Management (OLM) design and implement a system to move spent nuclear fuel (SNF) and high-level radioactive waste (HLW) to the Yucca Mountain repository for disposal when that facility is licensed and built. This report suggests topics for additional study. The project team looked at three Federal radioactive material logistics operations that are widely viewed to be successful: (1) the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico; (2)more » the Naval Nuclear Propulsion Program (NNPP); and (3) domestic and foreign research reactor (FRR) SNF acceptance programs. (authors)« less

  3. Safety pilot model deployment : lessons learned and recommendations for future connected vehicle activities.

    DOT National Transportation Integrated Search

    2015-09-01

    The Connected Vehicle Safety Pilot was a research program that demonstrated the readiness of DSRC-based connected vehicle safety applications for nationwide deployment. The vision of the Connected Vehicle Safety Pilot Program was to test connected ve...

  4. Connected Vehicle Pilot Deployment Program, Comprehensive Installation Plan - WYDOT CV Pilot

    DOT National Transportation Integrated Search

    2018-02-16

    The Wyoming Department of Transportation's (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle-to-infrastructure (V2I) and vehicle-to-vehicle (V2V) communication technology to re...

  5. Interim report to the U.S. Congress on the Nonmotorized Transportation Pilot Program, SAFETEA-LU Section 1807

    DOT National Transportation Integrated Search

    2007-11-01

    This interim report to Congress summarizes the progress and initial results of the Federal Highway Administrations (FHWA) and the four pilot communities participation in the Nonmotorized Transportation Pilot Program (NTPP) from its inception th...

  6. Evaluation of engineering foods for Controlled Ecological Life Support Systems (CELSS)

    NASA Technical Reports Server (NTRS)

    Karel, M.

    1982-01-01

    The feasibility of developing acceptable and reliable engineered foods for use in controlled ecological support systems (CELSS) was evaluated. Food resupply and regeneration are calculated, flow charts of food processes in a multipurpose food pilot plant are presented, and equipment for a multipurpose food pilot plant and potential simplification of processes are discussed. Food-waste treatment and water usage in food processing and preparation are also considered.

  7. Initial test of large panels of structural flakeboard from southern hardwoods

    Treesearch

    Eddie W. Price

    1975-01-01

    A strong structural exterior flakeboard from mixed southern hardwoods has been developed on a laboratory scale; the problem is transfer of the technique to pilot-plant scale in the manufacture of 4- by 8-ft panels. From the pilot-plant trial here reported, it is concluded that a specific platen pressure of at least 575 psi and a hot press closing time of about 45...

  8. Integrated bicarbonate-form ion exchange treatment and regeneration for DOC removal: Model development and pilot plant study.

    PubMed

    Hu, Yue; Boyer, Treavor H

    2017-05-15

    The application of bicarbonate-form anion exchange resin and sodium bicarbonate salt for resin regeneration was investigated in this research is to reduce chloride ion release during treatment and the disposal burden of sodium chloride regeneration solution when using traditional chloride-form ion exchange (IX). The target contaminant in this research was dissolved organic carbon (DOC). The performance evaluation was conducted in a completely mixed flow reactor (CMFR) IX configuration. A process model that integrated treatment and regeneration was investigated based on the characteristics of configuration. The kinetic and equilibrium experiments were performed to obtain required parameters for the process model. The pilot plant tests were conducted to validate the model as well as provide practical understanding on operation. The DOC concentration predicted by the process model responded to the change of salt concentration in the solution, and showed a good agreement with pilot plant data with less than 10% difference in terms of percentage removal. Both model predictions and pilot plant tests showed over 60% DOC removal by bicarbonate-form resin for treatment and sodium bicarbonate for regeneration, which was comparable to chloride-form resin for treatment and sodium chloride for regeneration. Lastly, the DOC removal was improved by using higher salt concentration for regeneration. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Monitoring and toxicity evaluation of phytoplankton on lithium manganese oxide adsorbents at lithium recovery pilot plant field.

    NASA Astrophysics Data System (ADS)

    Yoon, H. O.; Kim, J. A.; Kim, J. C.; Chung, K. S.; Ryu, J. H.

    2015-12-01

    For recovery of rare mineral resources such as lithium or boron from seawater, the lithium adsorbent material have been made by Korea Institute of Geoscience and Mineral Resources (KIGAM) and pilot plant was conducted in Okgye Harbor, Gangneung, Korea. The application of lithium adsorbent in pilot plant, it is important to consider the impact on the marine environment. Especially phytoplankton communities are important marine microorganism to represent marine primary product. At the same time, phytoplankton is possible to induce the decrease of lithium recovery rate due to cause of biofouling to surfaces of lithium adsorbents. Therefore long-term and periodic monitoring of phytoplankton is necessary to understand the environmental impact and biofouling problems near the lithium pilot plant. The abundance and biomass of phytoplankton have been evaluated through monthly interval sampling from February 2013 to May 2015. Abundance and species diversity of phytoplankton went up to summer from winter. When lithium adsorbents were immersing to seawater, eco-toxicities of released substances were determined using Microtox with bioluminescence bacteria Vibrio fischeri. The adsorbents were soaked in sterilized seawater and aeration for 1, 3, 5, 7, 10 and 14 days intervals under controlled temperature. Maximum EC50 concentration was 61.4% and this toxicity was showed in more than 10 days exposure.

  10. Membrane bio-reactor for textile wastewater treatment plant upgrading.

    PubMed

    Lubello, C; Gori, R

    2005-01-01

    Textile industries carry out several fiber treatments using variable quantities of water, from five to forty times the fiber weight, and consequently generate large volumes of wastewater to be disposed of. Membrane Bio-reactors (MBRs) combine membrane technology with biological reactors for the treatment of wastewater: micro or ultrafiltration membranes are used for solid-liquid separation replacing the secondary settling of the traditional activated sludge system. This paper deals with the possibility of realizing a new section of one existing WWTP (activated sludge + clariflocculation + ozonation) for the treatment of treating textile wastewater to be recycled, equipped with an MBR (76 l/s as design capacity) and running in parallel with the existing one. During a 4-month experimental period, a pilot-scale MBR proved to be very effective for wastewater reclamation. On average, removal efficiency of the pilot plant (93% for COD, and over 99% for total suspended solids) was higher than the WWTP ones. Color was removed as in the WWTP. Anionic surfactants removal of pilot plant was lower than that of the WWTP (90.5 and 93.2% respectively), while the BiAS removal was higher in the pilot plant (98.2 vs. 97.1). At the end cost analysis of the proposed upgrade is reported.

  11. 78 FR 68853 - International Medical Device Regulators Forum; Medical Device Single Audit Program International...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ...] International Medical Device Regulators Forum; Medical Device Single Audit Program International Coalition Pilot... Drug Administration (FDA) is announcing participation in the Medical Device Single Audit Program International Coalition Pilot Program. The Medical Device Single Audit Program (MDSAP) was designed and...

  12. HUD PowerSaver Pilot Loan Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimring, Mark; Hoffman, Ian

    2010-12-10

    The U.S. Department of Housing and Urban Development (HUD) recently announced the creation of a pilot loan program for home energy improvements. The PowerSaver loan program is a new, energy-focused variant of the Title I Property Improvement Loan Insurance Program (Title I Program) and is planned for introduction in early 2011. The PowerSaver pilot will provide lender insurance for secured and unsecured loans up to $25,000 to single family homeowners. These loans will specifically target residential energy efficiency and renewable energy improvements. HUD estimates the two-year pilot will fund approximately 24,000 loans worth up to $300 million; the program ismore » not capped. The Federal Housing Administration (FHA), HUD's mortgage insurance unit, will provide up to $25 million in grants as incentives to participating lenders. FHA is seeking lenders in communities with existing programs for promoting residential energy upgrades.« less

  13. Using an eTextbook and iPad: Results of a Pilot Program

    ERIC Educational Resources Information Center

    Sloan, Roberta H.

    2013-01-01

    An eTextbook and iPad were used in a pilot program, and the impact on the course was assessed to guide the development of a college policy. Students in the course completed three questionnaires to provide feedback about their perceptions of the eTextbook and iPad. During the pilot program, students' perceptions of the usefulness, ease of use, and…

  14. 78 FR 41481 - Self-Regulatory Organizations; Chicago Board Options Exchange, Incorporated; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... Effectiveness of a Proposed Rule Change Relating to Extending FLEX AIM Pilot Program Until July 18, 2014 July 5... Pilot Period expiring on July 18, 201[3]4, there will be no minimum size requirement for orders to be... change merely extends the duration of the pilot program until July 18, 2014. Extending the pilot for an...

  15. Connected Vehicle Pilot Deployment Program phase I : comprehensive Pilot Deployment Plan : Tampa Hillsborough Expressway Authority (THEA) : final report.

    DOT National Transportation Integrated Search

    2016-07-01

    The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program is part of a national effort to advance CV technologies by deploying, demonstrating, testing and offering lessons learned for future deployers. The THE...

  16. Connected Vehicle Pilot Deployment Program phase 1 : performance measurement and evaluation support plan : Tampa (THEA) : final report.

    DOT National Transportation Integrated Search

    2016-03-14

    The Performance Measurement and Evaluation Support Plan for the Connected Vehicle Pilot Deployment Program Phase 1, Tampa Hillsborough Expressway Authority, outlines the goals and objectives for the Pilot as well as the proposed performance metrics. ...

  17. 77 FR 33498 - Joint Industry Plans; Order Approving, on a Pilot Basis, the National Market System Plan To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... pilot program, which was implemented through a series of rule filings by the Exchanges and FINRA. This... as a one-year pilot program in two Phases. Phase I of the Plan would be implemented immediately...

  18. Treatment of the Cerro Prieto I brines for use in reinjection. 2. Results of the pilot plant tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hurtado J, R.; Mercado G, S.; Rocha C, E.

    Silica removal experiments have been carried out both in the laboratory and in pilot scale tests. The results obtained to date are presented, with special emphasis on the pilot tests with or without the use of flocculants. Previous studies on brine treatment are described briefly.

  19. Transportation Education Demonstration Pilot Program UVM Transportation Research Center

    DOT National Transportation Integrated Search

    2012-06-30

    The Transportation Education Development Pilot Program (TEDPP) develops innovative workforce development programs to attract and retain skilled workers in the transportation sector of Vermont, New Hampshire and Maine and encourages statewide economic...

  20. Production characteristics of lettuce Lactuca sativa L. in the frame of the first crop tests in the Higher Plant Chamber integrated into the MELiSSA Pilot Plant

    NASA Astrophysics Data System (ADS)

    Tikhomirova, Natalia; Lawson, Jamie; Stasiak, Michael; Dixon, Mike; Paille, Christel; Peiro, Enrique; Fossen, Arnaud; Godia, Francesc

    Micro-Ecological Life Support System Alternative (MELiSSA) is an artificial closed ecosystem that is considered a tool for the development of a bioregenerative life support system for manned space missions. One of the five compartments of MELiSSA loop -Higher Plant Chamber was recently integrated into the MELiSSA Pilot Plant facility at Universitat Aut`noma deo Barcelona. The main contributions expected by integration of this photosynthetic compartment are oxygen, water, vegetable food production and CO2 consumption. Production characteristics of Lactuca sativa L., as a MELiSSA candidate crop, were investigated in this work in the first crop experiments in the MELiSSA Pilot Plant facility. The plants were grown in batch culture and totaled 100 plants with a growing area 5 m long and 1 m wide in a sealed controlled environment. Several replicates of the experiments were carried out with varying duration. It was shown that after 46 days of lettuce cultivation dry edible biomass averaged 27, 2 g per plant. However accumulation of oxygen in the chamber, which required purging of the chamber, and decrease in the food value of the plants was observed. Reducing the duration of the tests allowed uninterrupted test without opening the system and also allowed estimation of the crop's carbon balance. Results of productivity, tissue composition, nutrient uptake and canopy photosynthesis of lettuce regardless of test duration are discussed in the paper.

  1. Introduction to the Atari Computer. A Program Written in the Pilot Programming Language.

    ERIC Educational Resources Information Center

    Schlenker, Richard M.

    Designed to be an introduction to the Atari microcomputers for beginners, the interactive computer program listed in this document is written in the Pilot programing language. Instructions are given for entering and storing the program in the computer memory for use by students. (MES)

  2. MS PHD'S: Effective Pathways to Mentoring for Increasing Diversity in the Geoscience Workforce - What have we done? What can we still do?

    NASA Astrophysics Data System (ADS)

    Ricciardi, L.; Johnson, A.; Williamson Whitney, V.; Ithier-Guzman, W.; Johnson, A.; Braxton, L.

    2011-12-01

    In 2003 a young, African-American geoscientist and professor discovered significant gaps in the recruitment and retention of minority students within the post-secondary educational community and a subsequent correlation of underrepresentation within the geosciences workforce. From this research, a unique concept was born: The Minorities Striving and Pursuing Higher Degrees of Success in Earth System Science Professional Development Program (MS PHD'S PDP). This program was founded upon a vision that minorities can and should play a role in facilitating a network to attract, retain and increase minority representation in the geosciences workforce. In 2003, the pilot MS PHD'S program focused on a simple grass roots concept of effective mentoring and professional development administered by and for minorities through professional development activities. Today the program has grown to an impressive number of alumni who, in addition to establishing careers in the ESS professional workforce, also return to mentor the next generation of upcoming minority geoscientists. Alumni, mentors and current participants not only experience what has grown into a three-phase program but also enjoy enhanced benefits of ongoing interaction through social media, list-servs and webinars. While keeping its feet firmly planted in its grass-roots philosophy of effective mentoring and professional development by and for minorities, the MS PHD'S program looks to the future, by asking the question, "What can we do next to ensure the future of maintaining and growing diverse representation in the geosciences workforce?" Looking ahead, future goals for the program include increasing its pilot representation motto of "by and for minorities", exploring new technologies and digital tools, and expanding its supportive network of distinguished academicians, scientific organizations, industry partners, alumni, peers, and representatives of non-science disciplines.

  3. Determination of sex hormones and nonylphenol ethoxylates in the aqueous matrixes of two pilot-scale municipal wastewater treatment plants.

    PubMed

    Esperanza, Mar; Suidan, Makram T; Nishimura, Fumitake; Wang, Zhong-Min; Sorial, George A; Zaffiro, Alan; McCauley, Paul; Brenner, Richard; Sayles, Gregory

    2004-06-01

    Two analytical methods were developed and refined for the detection and quantitation of two groups of endocrine-disrupting chemicals (EDCs) in the liquid matrixes of two pilot-scale municipal wastewater treatment plants. The targeted compounds are seven sex hormones (estradiol, ethinylestradiol, estrone, estriol, testosterone, progesterone, and androstenedione), a group of nonionic surfactants (nonylphenol polyethoxylates), and their biodegradation byproducts nonylphenol and nonylphenol ethoxylates with one, two, and three ethoxylates. Solid phase extraction using C-18 for steroids and graphitized carbon black for the surfactants were used for extraction. HPLC-DAD and GC/MS were used for quantification. Each of the two 20 L/h pilot-scale plants consists of a primary settling tank followed by a three-stage aeration tank and final clarification. The primary and the waste-activated sludge are digested anaerobically in one plant and aerobically in the other. The pilot plants are fed with a complex synthetic wastewater spiked with the EDCs. Once steady state was reached, liquid samples were collected from four sampling points to obtain the profile for all EDCs along the treatment system. Complete removal from the aqueous phase was obtained for testosterone, androstenedione, and progesterone. Removals for nonylphenol polyethoxylates, estradiol, estrone, and ethinylestradiol from the aqueous phase exceeded 96%, 94%, 52%, and 50%, respectively. Levels of E3 in the liquid phase were low, and no clear conclusions could be drawn concerning its removal.

  4. 75 FR 82134 - Agency Information Collection Activities: Requests for Comments; Clearance of Renewed Approval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... Aviation Regulation. The pilot training requires a logbook endorsement and documentation of a training...) that established a standardized pilot training program. The collection of information is necessary to document participation, completion, and compliance with the pilot training program. Respondents...

  5. 14 CFR 121.423 - Pilot: Extended Envelope Training.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Pilot: Extended Envelope Training. 121.423... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Training Program § 121.423 Pilot: Extended Envelope Training. (a) Each certificate holder must include in its approved training program, the extended envelope...

  6. Field Testing of a Wet FGD Additive for Enhanced Mercury Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gary Blythe; MariJon Owens

    2007-12-31

    This document is the final report for DOE-NETL Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project has been to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project was intended to demonstrate whether such additives can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from themore » FGD liquor and bulk solid byproducts for separate disposal. The project involved pilot- and full-scale tests of the additives in wet FGD absorbers. The tests were intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power provided the Texas lignite/PRB co-fired test site for pilot FGD tests and project cost sharing. Southern Company provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested, and project cost sharing. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation provided the TMT-15 additive, and the Nalco Company provided the Nalco 8034 additive. Both companies also supplied technical support to the test program as in-kind cost sharing. The project was conducted in six tasks. Of the six tasks, Task 1 involved project planning and Task 6 involved management and reporting. The other four tasks involved field testing on FGD systems, either at pilot or full scale. These four tasks included: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests were completed in 2005 and the full-scale test using high-sulfur coal was completed in 2006; only the TMT-15 additive was tested in these efforts. The Task 5 full-scale additive tests conducted at Southern Company's Plant Yates Unit 1 were completed in 2007, and both the TMT-15 and Nalco 8034 additives were tested.« less

  7. WATER FILTRATION AT DULUTH

    EPA Science Inventory

    After partial completion of the Lakewood Filtration Plant at Duluth, studies were begun with funding provided by the demonstration grant. Research covered a variety of topics and was done with a 10 gpm pilot plant located at the filtration plant, with the full scale plant operati...

  8. Preliminary Engineering Report for the Use of Peracetic Acid at the Oak Ridge National Laboratory Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Paul Allen

    2017-02-01

    The purpose of this report is to identify other disinfection methods to replace the current ozone system and propose a small pilot-scale test. Based on a review of the literature and disinfectants used by other wastewater plants in Tennessee, peracetic acid (PAA) was identified as a leading candidate. This report provides the basis for requesting approval for a pilot-scale study using PAA.

  9. Edible Oil Barriers for Treatment of Perchlorate Contaminated Groundwater

    DTIC Science & Technology

    2006-02-16

    perchlorate is relatively recent. Work performed in soil at Longhorn Army Ammunition Plant in Texas identified chicken manure, cow manure, and...Missile Plant , NC Pilot July-Aug. 2004 Recirculation of emulsion through source area Other DoD Facilities Confidential Site, MD Pilot Oct...G.M. Birk, 2004. A Dash of Oil and Let Marinate. Pollution Engineering, May 2004, pages 30-34. 6.3 End-User Issues Potential end users of the

  10. Pyrolysis of coal, biomass and their blends: performance assessment by thermogravimetric analysis.

    PubMed

    Ferrara, Francesca; Orsini, Alessandro; Plaisant, Alberto; Pettinau, Alberto

    2014-11-01

    With the aim to support the experimental tests in a gasification pilot plant, the thermal decomposition of coal, biomass and their mixtures has been carried out through a thermogravimetric analysis (TGA) and a simplified kinetic analysis. The TGA of pure fuels indicates the low reactivity of South African coal and the relatively high reactivity of Sardinian Sulcis coal during pyrolysis. Among the tested fuels, biomass (stone pine wood chips) is the most reactive one. These results fully confirm those obtained during the experimental tests in the gasification pilot plant. As for the fuel blends, the analysis shows that the synergic effects between the considered coals and biomass are negligible when they are co-pyrolyzed. The results of the analysis confirm that TGA could be very useful to generally predict the gasification performance and to optimize the experimental campaigns in pilot-scale gasification plants. Copyright © 2014 Elsevier Ltd. All rights reserved.

  11. 78 FR 25755 - Announcement of Funding Awards; Energy Innovation Fund-Multifamily Pilot Program Fiscal Year 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... Awards; Energy Innovation Fund-- Multifamily Pilot Program Fiscal Year 2010 AGENCY: Office of the... funding under the Notice of Funding Availability (NOFA) for the Energy Innovation Fund--Multifamily Pilot.... FOR FURTHER INFORMATION CONTACT: Linda W. Field, Director of Portfolio Management, Office of...

  12. Motivational Engineering for Pilot Training.

    ERIC Educational Resources Information Center

    Herzberg, Frederick I.; And Others

    The study was an investigation of student pilot motivation for, and toward, the Air Training Command's undergraduate pilot training (UPT) program. The motivation hygiene approach was used to identify the motivational factors operating in the UPT program systematically. This approach has been used extensively in industry and with success in a…

  13. 76 FR 22412 - Fellowship Placement Pilot Program Requests for Expressions of Interests To Administer Pilot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-21

    ... Program Requests for Expressions of Interests To Administer Pilot Contact Information Correction AGENCY...). The April 13, 2011, notice had an incorrect telephone number for the contact person. This notice corrects the Contact Information section of the notice. All other information remains correct as published...

  14. 14 CFR 91.1097 - Pilot and flight attendant crewmember training programs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Pilot and flight attendant crewmember..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1097 Pilot and flight attendant crewmember...

  15. 14 CFR 91.1097 - Pilot and flight attendant crewmember training programs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Pilot and flight attendant crewmember..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1097 Pilot and flight attendant crewmember...

  16. 14 CFR 91.1097 - Pilot and flight attendant crewmember training programs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Pilot and flight attendant crewmember..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1097 Pilot and flight attendant crewmember...

  17. Substance Use Recovery Outcomes among a Cohort of Youth Participating in a Mobile-Based Texting Aftercare Pilot Program

    PubMed Central

    Gonzales, Rachel; Ang, Alfonso; Murphy, Debra A.; Glik, Deborah C.; Anglin, M. Douglas

    2014-01-01

    Project ESQYIR (Educating & Supporting inquisitive Youth in Recovery) is a pilot study examining the feasibility of a 12-week mobile-based aftercare intervention for youth (ages 12 to 24) transitioning out of community-based substance abuse treatment programs. From January 2012 through July 2013, a total of 80 youth were recruited from outpatient and residential treatment programs, geographically dispersed throughout Los Angeles County, California. Results revealed that youth who participated in the texting mobile pilot intervention were significantly less likely to relapse to their primary compared to the aftercare as usual control condition (OR = 0.52, p = 0.002) over time (from baseline throughout the 12-week aftercare pilot program to a 90-day follow-up). Participants in the texting aftercare pilot program also reported significantly less substance use problem severity (β = −0.46, p = .03) and were more likely to participate in extracurricular recovery behaviors (β = 1.63, p = .03) compared to participants in the standard aftercare group. Collectively, findings from this pilot aftercare study suggest that mobile texting could provide a feasible way to engage youth in recovery after substance abuse treatment to aid with reducing relapse and promoting lifestyle behavior change. PMID:24629885

  18. Treatment of chromium contaminated plating shop rinsewater streams by reverse osmosis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, J.F.; Brown, C.H. Jr.; Wilson, J.H.

    1988-01-01

    Wastewater is discharged to the local sanitary sewer, which is regulated by a Metropolitan Sewer District (MSD). The MSD has established discharge limits and reports have indicated that the major source of wastewater and primary area of concern is the discharge from the industrial plating shop within the plant complex. This plating shop generates /approximately/1100 m/sup 3/ (300,000 gal) of wastewater per day. Because construction of a new plating shop is currently planned, a complete renovation of the existing plating shop is not economically feasible. The sponsor demonstrated the use of innovative wastewater treatment technologies that will minimize the amountmore » of wastewater generated from the plating processes and maintain compliance with MSD discharge limits until the new plating shop is constructed. The problems at the facility have been analyzed and a treatment system utilizing reverse osmosis (RO), with volume reduction of the RO concentrate by evaporation, has been recommended. The utilization of RO meets the specification for the demonstration of innovative technology. This paper discusses the problem analysis at the plant as well as the results of a pilot scale RO test program currently being conducted. The installation of the full scale unit is dependent on the successful completion of the RO pilot tests. 1 ref., 6 figs., 3 tabs.« less

  19. 48 CFR 1819.7208 - Award Fee Pilot Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS NASA Mentor-Protégé Program 1819.7208 Award Fee Pilot Program. (a) Mentors will be eligible to earn a separate award fee associated with the provision... the end of the Mentor-Protégé agreement period. (b) The overall developmental assistance performance...

  20. Coping in the Cyberworld: Program Implementation and Evaluation--A Pilot Project

    ERIC Educational Resources Information Center

    Lam, Cecilia Wing Chi; Frydenberg, Erica

    2009-01-01

    As increasing numbers of adolescents become involved in online activities, many also become victims of cyberharassment. This pilot project investigates how a program teaching coping skills (Best of Coping program, BOC) and a program teaching cybersafety (Cyber Savvy Teens program, CST) can optimise adolescents' capacity to cope online.…

  1. Proposed 10 MWe OTEC pilot plant for the Commonwealth of the Northern Mariana Islands

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunbar, L.E.; Chan, G.L.

    1981-01-01

    A preliminary conceptual design of a 10 MWe OTEC pilot plant has been proposed for the island of Saipan in the Commonwealth of the Northern Mariana Islands. This unique small OTEC plant is intended as a prototype for commercial plants in the small Pacific Island territories and nations. The system concept minimizes local construction to accommodate a lack of local skilled labor and facilities. The baseline design is a concrete barge-mounted plant built in Portland, Oregon, towed to Saipan, and permanently anchored in near-shore shallow water. Details of key subsystem design features are provided including a bottom-mounted cold water pipe,more » modular power subsystem, and wave shield for storm protection. The results of economic analyses are presented to illustrate the cost competitiveness of electricity from the OTEC plant compared to the current oil-fired diesel units in Saipan.« less

  2. Proposed 10 MWe OTEC pilot plant for the Commonwealth of the Northern Mariana Islands

    NASA Astrophysics Data System (ADS)

    Dunbar, L. E.; Chan, G. L.

    1981-12-01

    A preliminary conceptual design of a 10 MWe OTEC pilot plant has been proposed for the island of Saipan in the Commonwealth of the Northern Mariana Islands. This unique small OTEC plant is intended as a prototype for commercial plants in the small Pacific Island territories and nations. The system concept minimizes local construction to accommodate a lack of local skilled labor and facilities. The baseline design is a concrete barge-mounted plant built in Portland, Oregon, towed to Saipan, and permanently anchored in near-shore shallow water. Details of key subsystem design features are provided including a bottom-mounted cold water pipe, modular power subsystem, and wave shield for storm protection. The results of economic analyses are presented to illustrate the cost competitiveness of electricity from the OTEC plant compared to the current oil-fired diesel units in Saipan.

  3. What can a pilot congestive heart failure disease management program tell us about likely return on investment?: A case study from a program offered to federal employees.

    PubMed

    vanVonno, Catherine J; Ozminkowski, Ronald J; Smith, Mark W; Thomas, Eileen G; Kelley, Doniece; Goetzel, Ron; Berg, Gregory D; Jain, Susheel K; Walker, David R

    2005-12-01

    In 1999, the Blue Cross and Blue Shield Federal Employee Program (FEP) implemented a pilot disease management program to manage congestive heart failure (CHF) among members. The purpose of this project was to estimate the financial return on investment in the pilot CHF program, prior to a full program rollout. A cohort of 457 participants from the state of Maryland was matched to a cohort of 803 nonparticipants from a neighboring state where the CHF program was not offered. Each cohort was followed for 12 months before the program began and 12 months afterward. The outcome measures of primary interest were the differences over time in medical care expenditures paid by FEP and by all payers. Independent variables included indicators of program participation, type of heart disease, comorbidity measures, and demographics. From the perspective of the funding organization (FEP), the estimated return on investment for the pilot CHF disease management program was a savings of $1.08 in medical expenditure for every dollar spent on the program. Adding savings to other payers as well, the return on investment was a savings of $1.15 in medical expenditures per dollar spent on the program. The amount of savings depended upon CHF risk levels. The value of a pilot initiative and evaluation is that lessons for larger-scale efforts can be learned prior to full-scale rollout.

  4. International Safeguards Technology and Policy Education and Training Pilot Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dreicer, M; Anzelon, G A; Essner, J T

    2009-06-16

    A major focus of the National Nuclear Security Administration-led Next Generation Safeguards Initiative (NGSI) is the development of human capital to meet present and future challenges to the safeguards regime. An effective university-level education in safeguards and related disciplines is an essential element in a layered strategy to rebuild the safeguards human resource capacity. NNSA launched two pilot programs in 2008 to develop university level courses and internships in association with James, Martin Center for Nonproliferation Studies (CNS) at the Monterey Institute of International Studies (MIIS) and Texas A&M University (TAMU). These pilot efforts involved 44 students in total andmore » were closely linked to hands-on internships at Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL). The Safeguards and Nuclear Material Management pilot program was a collaboration between TAMU, LANL, and LLNL. The LANL-based coursework was shared with the students undertaking internships at LLNL via video teleconferencing. A weeklong hands-on exercise was also conducted at LANL. A second pilot effort, the International Nuclear Safeguards Policy and Information Analysis pilot program was implemented at MIIS in cooperation with LLNL. Speakers from MIIS, LLNL, and other U.S. national laboratories (LANL, BNL) delivered lectures for the audience of 16 students. The majority of students were senior classmen or new master's degree graduates from MIIS specializing in nonproliferation policy studies. The two pilots programs concluded with an NGSI Summer Student Symposium, held at LLNL, where 20 students participated in LLNL facility tours and poster sessions. The value of bringing together the students from the technical and policy pilots was notable and will factor into the planning for the continued refinement of the two programs in the coming years.« less

  5. Evaluation of the use of reverse osmosis to eliminate natural radionuclides from water samples.

    PubMed

    Nieto, Antonio; Palomo, Marta; Ruana, Josep; Peñalver, Alejandra; Aguilar, Carme; Borrull, Francesc

    2013-12-01

    The objective of drinking water treatment plants (DWTP) is to supply the population with tap water that is in optimal condition and in compliance with water quality regulations. In the DWTP of L'Ampolla (Tarragona, Spain), slightly high values of gross alpha activity and the amount of salts in the raw water have been observed. Conventional treatment has reduced these levels only minimally. This study tested a tertiary treatment based on reverse osmosis is tested in an industrial pilot plant (240 m3/day) The efficiency of this pilot plant to reduce the gross alpha and beta activities and the activity of some individual radioisotopes (U(238), U(234), U(235) and Ra(226)) was tested. Results showed that the elimination of alpha emitters was greater than 90%, whereas the elimination of beta emitters was about 35%. Overall, the data provided evidence that the pilot plant is effective for removing different radionuclides that can be present in the incoming water treated. Therefore, tertiary treatment based on reverse osmosis has a positive effect in water quality.

  6. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... you are placed in a control group which is not subject to the alternative requirements, limitations... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program...

  7. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... you are placed in a control group which is not subject to the alternative requirements, limitations... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program...

  8. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... you are placed in a control group which is not subject to the alternative requirements, limitations... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program...

  9. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... you are placed in a control group which is not subject to the alternative requirements, limitations... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program...

  10. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... you are placed in a control group which is not subject to the alternative requirements, limitations... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Experimental, pilot, and demonstration... Because of Essential Persons § 416.250 Experimental, pilot, and demonstration projects in the SSI program...

  11. 77 FR 37055 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... Request; Secure Supply Chain Pilot Program AGENCY: Food and Drug Administration, HHS. ACTION: Notice... identified with the title Secure Supply Chain Pilot Program. Also include the FDA docket number found in... following proposed collection of information to OMB for review and clearance: ``Secure Supply Chain Pilot...

  12. 14 CFR 91.1055 - Pilot operating limitations and pairing requirement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Pilot operating limitations and pairing... Ownership Operations Program Management § 91.1055 Pilot operating limitations and pairing requirement. (a... aircraft being flown, and the pilot in command is not an appropriately qualified check pilot, the pilot in...

  13. 14 CFR 91.1055 - Pilot operating limitations and pairing requirement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Pilot operating limitations and pairing... Ownership Operations Program Management § 91.1055 Pilot operating limitations and pairing requirement. (a... aircraft being flown, and the pilot in command is not an appropriately qualified check pilot, the pilot in...

  14. U.S. Department of Energy Implementation of Chemical Evaluation Requirements for Transuranic Waste Disposal at the Waste Isolation Pilot Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moon, Alison; Barkley, Michelle; Poppiti, James

    This report summarizes new controls designed to ensure that transuranic waste disposed at the Waste Isolation Pilot Plant (WIPP) does not contain incompatible chemicals. These new controls include a Chemical Compatibility Evaluation, an evaluation of oxidizing chemicals, and a waste container assessment to ensure that waste is safe for disposal. These controls are included in the Chapter 18 of the Documented Safety Analysis for WIPP (1).

  15. A pilot-scale study on PVA gel beads based integrated fixed film activated sludge (IFAS) plant for municipal wastewater treatment.

    PubMed

    Kumar Singh, Nitin; Singh, Jasdeep; Bhatia, Aakansha; Kazmi, A A

    2016-01-01

    In the present study, a pilot-scale reactor incorporating polyvinyl alcohol gel beads as biomass carrier and operating in biological activated sludge mode (a combination of moving bed biofilm reactor (MBBR) and activated sludge) was investigated for the treatment of actual municipal wastewater. The results, during a monitoring period of 4 months, showed effective removal of chemical oxygen demand (COD), biological oxygen demand (BOD) and NH3-N at optimum conditions with 91%, ∼92% and ∼90% removal efficiencies, respectively. Sludge volume index (SVI) values of activated sludge varied in the range of 25-72 mL/g, indicating appreciable settling characteristics. Furthermore, soluble COD and BOD in the effluent of the pilot plant were reduced to levels well below discharge limits of the Punjab Pollution Control Board, India. A culture dependent method was used to enrich and isolate abundant heterotrophic bacteria in activated sludge. In addition to this, 16S rRNA genes analysis was performed to identify diverse dominant bacterial species in suspended and attached biomass. Results revealed that Escherichia coli, Pseudomonas sp. and Nitrosomonas communis played a significant role in biomass carrier, while Acinetobactor sp. were dominant in activated sludge of the pilot plant. Identification of ciliated protozoa populations rendered six species of ciliates in the plant, among which Vorticella was the most dominant.

  16. RESEARCH IN FILTRATION FOR CRYPTOSPORIDIUM REMOVAL

    EPA Science Inventory

    The USEPA has conducted pilot plant studies for the removal of Cryptosporidium oocysts from drinking water. Fourteen pilot-scale tests were performed to assess the ability of conventional treatment to control Cryptosporidium oocysts and three surrogates; turbidity, total particle...

  17. 75 FR 17380 - Patents Ombudsman Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ... Private Patent Application Information Retrieval (PAIR) system, or contact the various help desks for... before April 6, 2011. FOR FURTHER INFORMATION CONTACT: Mindy Fleisher, Special Programs Advisor... Ombudsman Pilot Program. SUPPLEMENTARY INFORMATION: The majority of patent applications filed with the USPTO...

  18. Alternatives to Piloting Textbooks.

    ERIC Educational Resources Information Center

    Muther, Connie

    1985-01-01

    Using short-term pilot programs to evaluate textbooks can lead to unreliable results and interfere with effective education. Alternative methods for evaluating textbook-based programs include obtaining documented analyses of competitors' products from sales agents, visiting districts using programs being considered, and examining publishers' own…

  19. Consolidated fuel reprocessing program

    NASA Astrophysics Data System (ADS)

    1985-02-01

    Improved processes and components for the Breeder Reprocessing Engineering Test (BRET) were identified and developed as well as the design, procurement and development of prototypic equipment. The integrated testing of process equipment and flowsheets prototypical of a pilot scale full reprocessing plant, and also for testing prototypical remote features of specific complex components in the system are provided. Information to guide the long range activities of the Consolidated Fuel Reprocessing Program (CERP), a focal point for foreign exchange activities, and support in specialized technical areas are described. Research and development activities in HTGR fuel treatment technology are being conducted. Head-end process and laboratory scale development efforts, as well as studies specific to HTGR fuel, are reported. The development of off-gas treatment processes has generic application to fuel reprocessing, progress in this work is also reported.

  20. Catching Fire: An Analysis of Maine's Combined Heat and Power Energy Incentive Policies

    NASA Astrophysics Data System (ADS)

    Laufer, Joshua A.

    This study qualitatively reviews and analyzes Maine's state-level incentive policies and regulations to catalyze the development of renewably fueled Combined Heat and Power (CHP) facilities by utilizing a framework developed by Janet Sawin. The results of the analysis indicate that additional opportunities exist to promote additional renewable CHP plant development through both strengthening existing state policies and passing new legislation. Maine's Renewable Portfolio Standard and Production-Based Incentive pilot program could be expanded in scope and in their level of support for renewable CHP. New policies could be enacted to further accelerate renewable CHP development in the state, such as a Production Tax Credit (PTC) and the creation of a grant program for level 2 feasibility studies within the existing Public Benefits Fund (PBF), Efficiency Maine Trust.

  1. Positive Exchange of Flight Controls Program

    DOT National Transportation Integrated Search

    1995-03-10

    This advisory circular provides guidance for all pilots, especially student pilots, flight instructors, and pilot examiners, on the recommended procedure to use for the positive exchange of flight controls between pilots when operating an aircraft.

  2. Photocatalytic treatment of an industrial effluent using artificial and solar UV radiation: an operational cost study on a pilot plant scale.

    PubMed

    Durán, A; Monteagudo, J M; San Martín, I

    2012-05-15

    The aim of this work was to study the operation costs of treating a real effluent from an integrated gasification combined cycle (IGCC) power station located in Spain. The study compares different homogeneous photocatalytic processes on a pilot plant scale using different types of radiation (artificial UV or solar UV with a compound parabolic collector). The efficiency of the processes was evaluated by an analysis of the total organic carbon (TOC) removed. The following processes were considered in the study: (i) a photo-Fenton process at an artificial UV pilot plant (with the initial addition of H(2)O(2)), (ii) a modified photo-Fenton process with continuous addition of H(2)O(2) and O(2) to the system and (iii) a ferrioxalate-assisted solar photo-Fenton process at a compound parabolic collector (CPC) pilot plant. The efficiency of these processes in degrading pollutants has been studied previously, and the results obtained in each of those studies have been published elsewhere. The operational costs due to the consumption of electrical energy, reagents and catalysts were calculated from the optimal conditions of each process. The results showed that the solar photo-Fenton system was economically feasible, being able to achieve up to 75% mineralization with a total cost of 6 €/m(3), which can be reduced to 3.6 €/m(3) by subtracting the electrical costs because the IGCC plant is self-sufficient in terms of energy. Copyright © 2011 Elsevier Ltd. All rights reserved.

  3. Research and development in pilot plant production of granular NPK fertilizer

    NASA Astrophysics Data System (ADS)

    Failaka, Muhamad Fariz; Firdausi, Nadia Zahrotul; Chairunnisa, Altway, Ali

    2017-05-01

    PT Pupuk Kaltim (Pupuk Kaltim) as one of the biggest fertilizer manufacturer in Indonesia, always striving to improve the product quality and achieve the optimal performance while facing the challenges of global competition NPK (Nitrogen, Phosphorus, Potassium) market. In order to continuously improve operations and processes of two units NPK compound plant, Pupuk Kaltim has successfully initiated a new facility which is referred to as a NPK pilot-scale research facility with design capacity of 30 kg/hr. This mini-plant is used to assist in the scale up of new innovations from laboratory research to better understand the effect of using new raw materials and experiment with process changes to improve quality and efficiency. The pilot installation is composed of the following main parts: mixer, screw feeder, granulator, dryer and cooler. The granulator is the equipment where NPK granules is formed by spraying appropriate steam and water onto raw materials in a rotating drum. The rotary dryer and cooler are intended for the drying process where temperature reduction and the final moisture are obtained. As a part of innovations project since 2014, the pilot plant has conducted many of experiments such as trials using Ammonium Sulfate (ZA) as a new raw material, alternative raw materials of Diammonium Phosphate (DAP), Potassium Chloride (KCl) and clay, and using a novel material of fly ash. In addition, the process engineering staff also conduct the trials of raw materials ratio so that an ideal formulation with lower cost can be obtained especially when it is applied in the existing full-scale plant.

  4. Aerobic nonaseptic growth of Verticillium on coffee waste waters and cane blackstrap molasses at a pilot plant scale

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Espinosa, R.; Maldonado, O.; Menchu, J.F.

    1977-01-01

    An evaluation is made of the pilot plant studies on the biosynthesis of Verticillium sp. both on coffee waste waters and blackstrap molasses. The purpose of the study was two-fold: the first to produce a filamentous fungi as a source of protein and the second to alleviate the serious water pollution resulting from the processing of coffee berries. The molasses was studied as an alternative medium to enable year-round operation of the plant since coffee is a seasonal crop. The results indicated that the growth of Verticillium is technically feasible in a batch operation. (JSR)

  5. Manned Systems Utilization Analysis. Study 2.1: Space Servicing Pilot Program Study. [for automated payloads

    NASA Technical Reports Server (NTRS)

    Wolfe, R. R.

    1975-01-01

    Space servicing automated payloads was studied for potential cost benefits for future payload operations. Background information is provided on space servicing in general, and on a pilot flight test program in particular. An fight test is recommended to demonstrate space servicing. An overall program plan is provided which builds upon the pilot program through an interim servicing capability. A multipayload servicing concept for the time when the full capability tug becomes operational is presented. The space test program is specifically designed to provide low-cost booster vehicles and a flight test platform for several experiments on a single flight.

  6. Macroalgae for CO 2 Capture and Renewable Energy - A Pilot Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiley, Kristine

    2011-01-31

    The objective of this project was to demonstrate, at a pilot scale, the beneficial use of carbon dioxide (CO 2) through a technology designed to capture CO 2 from fossil-fuel fired power plant stack gas, generating macroalgae and converting the macroalgae at high efficiency to renewable methane that can be utilized in the power plant or introduced into a natural gas pipeline. The proposed pilot plant would demonstrate the cost-effectiveness and CO 2/ NO x flue-gas removal efficiency of an innovative algal scrubber technology where seaweeds are grown out of water on specially-designed supporting structures contained within greenhouses where themore » plants are constantly bathed by recycled nutrient sprays enriched by flue gas constituents. The work described in this document addresses Phase 1 of the project only. The scope of work for Phase 1 includes the completion of a preliminary design package; the collection of additional experimental data to support the preliminary and detailed design for a pilot scale utilization of CO 2 to cultivate macroalage and to process that algae to produce methane; and a technological and economic analysis to evaluate the potential of the system. Selection criteria for macroalgae that could survive the elevated temperatures and potential periodic desiccation of near desert project sites were identified. Samples of the selected macroalgae species were obtained and then subjected to anaerobic digestion to determine conversions and potential methane yields. A Process Design Package (PDP) was assembled that included process design, process flow diagram, material balance, instrumentation, and equipment list, sizes, and cost for the Phase 2 pilot plant. Preliminary economic assessments were performed under the various assumptions made, which are purposely conservative. Based on the results, additional development work should be conducted to delineate the areas for improving efficiency, reducing contingencies, and reducing overall costs.« less

  7. Awareness and Perception of Plant-Based Diets for the Treatment and Management of Type 2 Diabetes in a Community Education Clinic: A Pilot Study

    PubMed Central

    Lee, Vincent; McKay, Taylor; Ardern, Chris I.

    2015-01-01

    Objective. To assess awareness, barriers, and promoters of plant-based diet use for management of type 2 diabetes (T2D) for the development of an appropriate educational program. Design. Cross-sectional study of patients and healthcare providers. Setting. Regional Diabetes Education Centre in ON, Canada. Participants. n = 98 patients attending the Diabetes Education Centre and n = 25 healthcare providers. Variables Measures. Patient questionnaires addressed demographics, health history, and eating patterns, as well as current knowledge, confidence levels, barriers to, promoters of, and interests in plant-based diets. Staff questionnaires addressed attitudes and current practice with respect to plant-based diets. Analysis. Mean values, frequency counts, and logistic regression (alpha = 0.05). Results. Few respondents (9%) currently followed a plant-based diet, but 66% indicated willingness to follow one for 3 weeks. Family eating preferences and meal planning skills were common barriers to diet change. 72% of healthcare providers reported knowledge of plant-based diets for diabetes management but low levels of practice. Conclusions and Implications. Patient awareness of the benefits of a plant-based diet for the management of diabetes remains suboptimal and may be influenced by perception of diabetes educators and clinicians. Given the reported willingness to try (but low current use of) plant-based diets, educational interventions targeting patient and provider level knowledge are warranted. PMID:25802755

  8. 76 FR 20799 - Intermediary Lending Pilot Program Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... Pilot (ILP) program established by the Small Business Jobs Act of 2010. The meetings will be open to the... holding open meetings to discuss the ILP program established in the Small Business Jobs Act of 2010 (Pub... program public meeting, please contact: 1. San Francisco--Steve Bangs, (415) 744-6792, fax (415) 744-6812...

  9. 76 FR 50969 - Further Inquiry Into Four Issues in the Universal Service Lifeline/Link Up Reform and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... Commission structure the pilot program so that each individual participant tests multiple design elements (e...: designing and implementing a Lifeline/Link Up broadband pilot program to evaluate whether and how Lifeline...; control the size of the program; strengthen program administration and accountability; improve enrollment...

  10. Improving Psychosexual Knowledge in Adolescents with Autism Spectrum Disorder: Pilot of the Tackling Teenage Training Program

    ERIC Educational Resources Information Center

    Dekker, Linda P.; van der Vegt, Esther J.; Visser, Kirsten; Tick, Nouchka; Boudesteijn, Frieda; Verhulst, Frank C.; Maras, Athanasios; Greaves-Lord, Kirstin

    2015-01-01

    Previous studies have shown that psychosexual functioning in adolescents with autism spectrum disorder (ASD) is hampered and emphasize the need for a specialized training program tailored to their needs. Therefore, an individual training program was developed; the Tackling Teenage Training (TTT) program. The current pilot study systematically…

  11. 78 FR 48520 - Self-Regulatory Organizations; New York Stock Exchange LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-08

    ... Proposed Rule Change Extending the Pilot Period for the Exchange's Retail Liquidity Program for an... The Exchange proposes to extend the pilot period for the Exchange's Retail Liquidity Program (the ``Retail Liquidity Program'' or the ``Program''), which is currently scheduled to expire on July 31, 2013...

  12. 76 FR 20699 - Fellowship Placement Pilot Program Requests for Expressions of Interest To Administer Pilot

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... program. The Administrator will be primarily responsible for marketing and advertising the program in... demonstrated history of direct public service or placement of public servants within the last 24 months. This... success of the fellowship program. iii. What it thinks the key responsibilities of the local organizations...

  13. Hunner's Ulcers

    MedlinePlus

    ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ...

  14. Bladder Retraining

    MedlinePlus

    ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ...

  15. Substance use recovery outcomes among a cohort of youth participating in a mobile-based texting aftercare pilot program.

    PubMed

    Gonzales, Rachel; Ang, Alfonso; Murphy, Debra A; Glik, Deborah C; Anglin, M Douglas

    2014-07-01

    Project ESQYIR (Educating & Supporting Inquisitive Youth in Recovery) is a pilot study examining the feasibility of a 12-week mobile-based aftercare intervention for youth (ages 12 to 24) transitioning out of community-based substance abuse treatment programs. From January 2012 through July 2013, a total of 80 youth were recruited from outpatient and residential treatment programs, geographically dispersed throughout Los Angeles County, California. Results revealed that youth who participated in the texting mobile pilot intervention were significantly less likely to relapse to their primary compared to the aftercare as usual control condition (OR=0.52, p=0.002) over time (from baseline throughout the 12-week aftercare pilot program to a 90-day follow-up). Participants in the texting aftercare pilot program also reported significantly less substance use problem severity (β=-0.46, p=0.03) and were more likely to participate in extracurricular recovery behaviors (β=1.63, p=0.03) compared to participants in the standard aftercare group. Collectively, findings from this pilot aftercare study suggest that mobile texting could provide a feasible way to engage youth in recovery after substance abuse treatment to aid with reducing relapse and promoting lifestyle behavior change. Copyright © 2014 Elsevier Inc. All rights reserved.

  16. U.S. Army Primary Helicopter School Training Program Performance Norms.

    ERIC Educational Resources Information Center

    Barnes, John A.; Statham, Flavous D.

    The Helicopter Pilot Training Program of the Army differs from those of the other services in concept. It takes nonpilot servicemen and trains them to fly helicopters. The study provides normative performance data for a pilot trainee in an army light-observation helicopter as a first step toward establishing normative data for pilot performance in…

  17. Extensiveness--Accuracy of Parent Information about Virginia Beach 45-15 Pilot Program.

    ERIC Educational Resources Information Center

    Schlechty Associates, Chapel Hill, NC.

    A preliminary analysis of parent responses to questions related to factual information about the Virginia Beach 45-15 pilot elementary school program, where students attend classes 45 days and break 15 days year round, is provided. Specifically, the information component of the Virginia Beach 45-15 Pilot Project Questionnaire, which consists of…

  18. 20 CFR 404.617 - Pilot program for photographic identification of disability benefit applicants in designated...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of Applications and Other Forms Applications § 404.617 Pilot program for photographic identification... the pilot, you or a person acting on your behalf must give SSA permission to take your photograph and make this photograph a part of the claims folder. You must give us this permission when you apply for...

  19. 75 FR 76062 - Self-Regulatory Organizations; NASDAQ OMX PHLX LLC; Notice of Filing and Immediate Effectiveness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement, on a Semi-Annual Basis, of Penny Pilot Issues that Have Been Delisted November 30, 2010. Pursuant to Section 19(b)(1) of... 1034 (Minimum Increments) to: Extend through December 31, 2011, the Penny Pilot Program in options...

  20. 77 FR 75234 - Self-Regulatory Organizations; BOX Options Exchange LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... Proposed Rule Change To Extend the Penny Pilot Program December 13, 2012. Pursuant to Section 19(b)(1) of... Proposed Rule Change BOX Options Exchange LLC (the ``Exchange'') proposes to amend Rule 7260 (Penny Pilot... penny increments (``Penny Pilot Program''). The text of the proposed rule change is available from the...

  1. 76 FR 79723 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... Rule Change To Extend the Penny Pilot Program December 15, 2011. Pursuant to Section 19(b)(1) of the... options in pennies (``Penny Pilot Program''). The text of the proposed rule change is as follows, with.... The Exchange may replace [, on a semi-annual basis,] any penny pilot issues that have been delisted...

  2. 75 FR 76064 - Self-Regulatory Organizations; the NASDAQ Stock Market LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... Proposed Rule Change Relating to Extension of the Exchange's Penny Pilot Program and Replacement, on a Semi-Annual Basis, of Penny Pilot Issues That Have Been Delisted November 30, 2010. Pursuant to Section 19(b... 5 (Minimum Increments) to: Extend through December 31, 2011, the Penny Pilot Program in options...

  3. G effects on the pilot during aerobatics.

    DOT National Transportation Integrated Search

    1972-07-01

    Sport, precision, and competitive aerobatics, and especially air show and demonstration flying are enjoying a rebirth of interest exceeding that of the 1930's. Improved aerobatic airplanes and power plants are in the hands of more civilian pilots tha...

  4. ARSENIC TREATMENT PILOT TESTS

    EPA Science Inventory

    This presentation provides information on the chemistry of arsenic in drinking water and the results of several pilot plant studies on the removal of arsenic from drinking water with emphasis on adsorptive media processes. Information is also being presented on the Arsenic Demon...

  5. Getty Oil Company Diatomite project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zuber, I.L.

    1984-09-01

    The feasibility of using Diatomite as a synthetic fuels feedstock is discussed. The asphaltic outcropping near McKittrick, California are evidence of oil bearing deposits. Two different processes have been taken to the pilot plant stage to evaluate the viability of recovering oil from the Diatomite ore. One approach was the retorting process which was developed by Lurgi. The other process is based on a totally different concept of solvent extracting the oil from the ore. The operation and performance of the pilot plants are described.

  6. Pilot plant operation of a nonadiabatic methanation reactor. [15 refs. ; Raney nickel catalyst

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schehl, R.R.; Pennline, H.W.; Strakey, J.P.

    The design and operation of a pilot plant scale hybrid methanation reactor is discussed. The hybrid methanator, utilizing a finned, Raney nickel coated insert, consolidates features of the tube-wall and hot-gas-recycle methanation reactors. Data are presented from four tests lasting from 3/sup 1///sub 2/ weeks to three months. Topics discussed include conversion, product yields, catalyst properties, and reactor temperature profiles. A one-dimensional mathematical model capable of explaining reactor performance trends is employed.

  7. Biosorption for the separation of radionuclides from drainage and process waters of the uranium mining industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glombitza, F.; Eckardt, L.; Hummel, A.

    1995-12-31

    Biosorption means the storage of substances at the cell envelope. Different microbial biomasses were tested for the separation of radionuclides from mining waters. Results of a pilot plant demonstrate the ability of these techniques for water cleaning processes. An effluent concentration of lower than 1 mg/l (in most cases 0.1 mg/1) could be realized in a pilot plant by using pure cells of a methylotrophic strain of bacteria as well as using of a fungal mycelia.

  8. Men and IC

    MedlinePlus

    ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ...

  9. IC Associated Conditions

    MedlinePlus

    ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ...

  10. General IC Symptoms

    MedlinePlus

    ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ...

  11. Children and IC

    MedlinePlus

    ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ...

  12. Pilot Plant Program for the AED Advanced Coal Cleaning System. Phase II. Interim final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-08-01

    Advanced Energy Dynamics, Inc. (AED), has developed a proprietary coal cleaning process which employs a combination of ionization and electrostatic separation to remove both sulfur and ash from dry pulverized coal. The Ohio Department of Energy sponsored the first part of a program to evaluate, develop, and demonstrate the process in a continuous-flow pilot plant. Various coals used by Ohio electric utilities were characterized and classified, and sulfur reduction, ash reduction and Btu recovery were measured. Sulfur removal in various coals ranged from 33 to 68% (on a Btu basis). Ash removal ranged from 17 to 59% (on a Btumore » basis). Ash removal of particles greater than 53 microns ranged from 46 to 88%. Btu recovery ranged from 90 to 97%. These results, especially the large percentage removal of ash particles greater than 53 microns, suggest that the AED system can contribute materially to improved boiler performance and availability. The study indicated the following potential areas for commercial utilization of the AED process: installation between the pulverizer and boiler of conventional coal-fired power utilities; reclamation of fine coal refuse; dry coal cleaning to supplement, and, if necessary, to take the place of conventional coal cleaning; upgrading coal used in: (1) coal-oil mixtures, (2) gasification and liquefaction processes designed to handle pulverized coal; and (3) blast furnaces for making steel, as a fuel supplement to the coke. Partial cleaning of coking coal blends during preheating may also prove economically attractive. Numerous other industrial processes which use pulverized coal such as the production of activated carbon and direct reduction of iron ore may also benefit from the use of AED coal cleaning.« less

  13. Evaluation of a seven state criminal history screening pilot program for long-term care workers.

    PubMed

    Radcliff, Tiffany A; White, Alan; West, David R; Hurd, Donna; Côté, Murray J

    2013-01-01

    This article summarizes results from an evaluation of a federally sponsored criminal history screening (CHS) pilot program to improve screening for workers in long-term care settings. The evaluation addressed eight key issues specified through enabling legislation, including efficiency, costs, and outcomes of screening procedures. Of the 204,339 completed screenings, 3.7% were disqualified due to criminal history, and 18.8% were withdrawn prior to completion for reasons that may include relevant criminal history. Lessons learned from the pilot program experiences may inform a new national background check demonstration program.

  14. Application of Several Techniques for Prohibiting Fouling in Li-Recovery Pilot Plant

    NASA Astrophysics Data System (ADS)

    Yoon, H.; Kim, D.; Gong, M.; Kim, B.; Chung, K.

    2010-12-01

    The problem of marine organisms adhering to any surfaces exposed in seawater is as old as time. Marine fouling is a major problem in the materials used in seawater worldwide. Marine coatings contain elements such as copper and triorganotin compounds were often used as an effective compound for control the fouling problem, but application of such coatings containing triorganotin compounds was prohibited and the former are considered undesirable because of its toxicity and accumulative in non-target organisms. Monitoring and field studies regarding fouling problems during operation of Li-recovery pilot plant which is designed by the Korea Institute of Geoscience & Mineral Resources (KIGAM) were major concern of this study. Fouling could be the most troublesome tasks during the development of a large scale pilot production test for achieving a high performance adsorbent for seawater dissolved Li recovery. Chemical and microbiological characteristics of the fouling biofilms developed on various surfaces in contact with the seawater were made. The microbial compositions of the biofilm consortia formed on the reservoir polymer surfaces were also tested for. The quantities of the diverse microorganisms in the biofilm samples developed on the prohibiting polymer reservoir surface were larger when there was no concern about materials for special selection for fouling. The experimental results offered new specific information, concerning the problems in the application of new material as well as surface coating such as anti-fouling coatings. They showed the important role microbial activity in fouling and corrosion of the surfaces in contact with the any seawater. Acknowledgements: This research was supported by a grant from the Development of Technology for Extraction of Resources Dissolved in Sea Water Program funded by Ministry of Land Transport and Maritime Affairs in Korean Government (2010).

  15. 14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Qualifications: Check pilots (aircraft) and check pilots (simulator). 91.1089 Section 91.1089 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... RULES Fractional Ownership Operations Program Management § 91.1089 Qualifications: Check pilots...

  16. 14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualifications: Check pilots (aircraft) and check pilots (simulator). 91.1089 Section 91.1089 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... RULES Fractional Ownership Operations Program Management § 91.1089 Qualifications: Check pilots...

  17. Interstitial Cystitis and Diet

    MedlinePlus

    ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ...

  18. IC Treatment: Surgical Procedures

    MedlinePlus

    ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ...

  19. IC: Frequently Asked Questions

    MedlinePlus

    ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ... Epidemiology (RICE) Study Boston Area Community Health (BACH) Survey ICA Pilot Research Program Funding Opportunities Clinical Trial ...

  20. USING ISOTHERMS TO PREDICT GAC'S CAPACITY FOR SYNTHETIC ORGANICS

    EPA Science Inventory

    This investigation involved operating a pilot granular activated carbon (GAC) plant to obtain capacity data under typical field conditions, determining isotherms for selected synthetic organic chemicals, and comparing the capacity predicted by the isotherm data with the pilot-pla...

  1. Slipstream pilot-scale demonstration of a novel amine-based post-combustion technology for carbon dioxide capture from coal-fired power plant flue gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krishnamurthy, Krish R.

    Post-combustion CO 2 capture (PCC) technology offers flexibility to treat the flue gas from both existing and new coal-fired power plants and can be applied to treat all or a portion of the flue gas. Solvent-based technologies are today the leading option for PCC from commercial coal-fired power plants as they have been applied in large-scale in other applications. Linde and BASF have been working together to develop and further improve a PCC process incorporating BASF’s novel aqueous amine-based solvent technology. This technology offers significant benefits compared to other solvent-based processes as it aims to reduce the regeneration energy requirementsmore » using novel solvents that are very stable under the coal-fired power plant feed gas conditions. BASF has developed the desired solvent based on the evaluation of a large number of candidates. In addition, long-term small pilot-scale testing of the BASF solvent has been performed on a lignite-fired flue gas. In coordination with BASF, Linde has evaluated a number of options for capital cost reduction in large engineered systems for solvent-based PCC technology. This report provides a summary of the work performed and results from a project supported by the US DOE (DE-FE0007453) for the pilot-scale demonstration of a Linde-BASF PCC technology using coal-fired power plant flue gas at a 1-1.5 MWe scale in Wilsonville, AL at the National Carbon Capture Center (NCCC). Following a project kick-off meeting in November 2011 and the conclusion of pilot plant design and engineering in February 2013, mechanical completion of the pilot plant was achieved in July 2014, and final commissioning activities were completed to enable start-up of operations in January 2015. Parametric tests were performed from January to December 2015 to determine optimal test conditions and evaluate process performance over a variety of operation parameters. A long-duration 1500-hour continuous test campaign was performed from May to August 2016 at a selected process condition to evaluate process performance and solvent stability over a longer period similar to how the process would operate as a continuously running large-scale PCC plant. The pilot plant integrated a number of unique features of the Linde-BASF technology aimed at lowering overall energy consumption and capital costs. During the overall test period including startup, parametric testing and long-duration testing, the pilot plant was operated for a total of 6,764 hours out of which testing with flue gas was performed for 4,109 hours. The pilot plant testing demonstrated all of the performance targets including CO 2 capture rate exceeding 90%, CO 2 purity exceeding 99.9 mol% (dry), flue gas processing capacity up to 15,500 lbs/hr (equivalent to 1.5 MWe capacity slipstream), regeneration energy as low as 2.7 GJ/tonne CO 2, and regenerator operating pressure up to 3.4 bara. Excellent solvent stability performance data was measured and verified by Linde and BASF during both test campaigns. In addition to process data, significant operational learnings were gained from pilot tests that will contribute greatly to the commercial success of PCC. Based on a thorough techno-economic assessment (TEA) of the Linde-BASF PCC process integrated with a 550 MWe supercritical coal-fired power plant, the net efficiency of the integrated power plant with CO 2 capture is increased from 28.4% with the DOE/NETL Case 12 reference to 30.9% with the Linde-BASF PCC plant previously presented utilizing the BASF OASE® blue solvent [Ref. 4], and is further increased to 31.4% using a Linde-BASF PCC plant with BASF OASE® blue solvent and an advanced stripper interstage heater (SIH) configuration. The Linde-BASF PCC plant incorporating the BASF OASE® blue solvent also results in significantly lower overall capital costs, thereby reducing the cost of electricity (COE) and cost of CO 2 captured from $147.25/MWh and $56.49/MT CO 2, respectively, for the reference DOE/NETL Case 12 plant, to $128.49/MWh and $41.85/MT CO2 for process case LB1, respectively, and $126.65/MWh and $40.66/MT CO 2 for process case SIH, respectively. With additional innovative Linde-BASF PCC process configuration improvements, the COE and cost of CO 2 captured can be further reduced to $125.51/MWh and $39.90/MT CO 2 for a further optimized PCC process defined as LB1-CREB. Most notably, the Linde-BASF process options assessed have already demonstrated the potential to lower the cost of CO 2 captured below the DOE target of $40/MT CO 2 at the 550 MWe scale for second generation PCC technologies. Project organization, structure, goals, tasks, accomplishments, process criteria and milestones will be presented in this report along with highlights and key results from parametric and long-duration testing of the Linde-BASF PCC pilot. The parametric and long-duration testing campaigns were aimed at validating the performance of the PCC technology against targets determined from a preliminary techno-economic assessment. The stability of the solvent with extended operation in a realistic power plant setting was measured with performance verified. Additionally, general solvent classification information, process operating conditions, normalized solvent performance data, solvent stability test results, flue gas conditions data, CO 2 purity data in the gaseous product stream, steam requirements and process flow diagrams, and updated process economic data for a scaled-up 550 MWe supercritical power plant with CO 2 capture are presented and discussed in this report.« less

  2. The effects of display and autopilot functions on pilot workload for Single Pilot Instrument Flight Rule (SPIFR) operations

    NASA Technical Reports Server (NTRS)

    Hoh, Roger H.; Smith, James C.; Hinton, David A.

    1987-01-01

    An analytical and experimental research program was conducted to develop criteria for pilot interaction with advanced controls and displays in single pilot instrument flight rules (SPIFR) operations. The analytic phase reviewed fundamental considerations for pilot workload taking into account existing data, and using that data to develop a divided attention SPIFR pilot workload model. The pilot model was utilized to interpret the two experimental phases. The first experimental phase was a flight test program that evaluated pilot workload in the presence of current and near-term displays and autopilot functions. The second experiment was conducted on a King Air simulator, investigating the effects of co-pilot functions in the presence of very high SPIFR workload. The results indicate that the simplest displays tested were marginal for SPIFR operations. A moving map display aided the most in mental orientation, but had inherent deficiencies as a stand alone replacement for an HSI. Autopilot functions were highly effective for reducing pilot workload. The simulator tests showed that extremely high workload situations can be adequately handled when co-pilot functions are provided.

  3. The Chinese Bilingual Pilot Program, ESEA Title VII, 1974: Program Guide.

    ERIC Educational Resources Information Center

    San Francisco Unified School District, CA.

    The 1965 Elementary Secondary Education Act Title VII Chinese Bilingual Pilot Program is a bilingual/bicultural program the purpose of which is to provide for the special educational needs of children who have limited English-speaking ability, who come from environments where the dominant language is one other than English, and who come from…

  4. A Pilot Study of an Online Workplace Nutrition Program: The Value of Participant Input in Program Development

    ERIC Educational Resources Information Center

    Cousineau, Tara; Houle, Brian; Bromberg, Jonas; Fernandez, Kathrine C.; Kling, Whitney C.

    2008-01-01

    Objective: Tailored nutrition Web programs constitute an emerging trend in obesity prevention. Initial investment in innovative technology necessitates that the target population be well understood. This pilot study's purpose was to determine the feasibility of a workplace nutrition Web program. Design: Formative research was conducted with gaming…

  5. Energy trump for Morocco: the oil shales (in French)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosa, S.D.

    1981-10-01

    The mainstays of the economy in Morocco are still agriculture and phosphates; the latter represent 34% of world exports. Energy demand in 1985 will be probably 3 times that in 1975. Most of the oil, which covers 82% of its energy needs, must be imported. Other possible sources are the rich oil shale deposits and nuclear energy. Four nuclear plants with a total of 600 MW are projected, but shale oil still will play an important role. A contract for building a pilot plant has been met recently. The plant is to be located at Timahdit and cost $13 million,more » for which a loan from the World Bank has been requested. If successful in the pilot plant, the process will be used in full scale plants scheduled to produce 400,000 tons/yr of oil. Tosco also has a contract for a feasibility study.« less

  6. Description of Audio-Visual Recording Equipment and Method of Installation for Pilot Training.

    ERIC Educational Resources Information Center

    Neese, James A.

    The Audio-Video Recorder System was developed to evaluate the effectiveness of in-flight audio/video recording as a pilot training technique for the U.S. Air Force Pilot Training Program. It will be used to gather background and performance data for an experimental program. A detailed description of the system is presented and construction and…

  7. "This Is My Best": The Report of Vermont's Writing Assessment Program, Pilot Year 1990-91.

    ERIC Educational Resources Information Center

    Vermont State Dept. of Education, Montpelier.

    A study examined the background, methods, and results of the pilot year of Vermont's Writing Assessment program. Students and teachers from 46 Vermont schools were invited to participate in the 1990-91 pilot year of portfolio assessment. Students in grades 4 and 8 chose samples of their best writing from the school year. Each portfolio was…

  8. 77 FR 40118 - Self-Regulatory Organizations; C2 Options Exchange, Incorporated; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... Change Relating to the Penny Pilot Program June 28, 2012. Pursuant to Section 19(b)(1) \\1\\ of the... of the Proposed Rule Change The Exchange proposes to amend its rules relating to the Penny Pilot... the Statutory Basis for, the Proposed Rule Change 1. Purpose The Penny Pilot Program is scheduled to...

  9. Coaching as Part of a Pilot Quality Rating Scale Initiative: Challenges to--and Supports for--the Change-Making Process

    ERIC Educational Resources Information Center

    Ackerman, Debra J.

    2008-01-01

    Several nonprofit agencies in a large Midwestern city provide assistance to early care and education programs participating in a pilot Quality Rating Scale (QRS) initiative by pairing them with itinerant consultants, who are known as coaches. Despite this assistance, not all programs improve their QRS score. Furthermore, while pilot stakeholders…

  10. Modeling temperature variations in a pilot plant thermophilic anaerobic digester.

    PubMed

    Valle-Guadarrama, Salvador; Espinosa-Solares, Teodoro; López-Cruz, Irineo L; Domaschko, Max

    2011-05-01

    A model that predicts temperature changes in a pilot plant thermophilic anaerobic digester was developed based on fundamental thermodynamic laws. The methodology utilized two simulation strategies. In the first, model equations were solved through a searching routine based on a minimal square optimization criterion, from which the overall heat transfer coefficient values, for both biodigester and heat exchanger, were determined. In the second, the simulation was performed with variable values of these overall coefficients. The prediction with both strategies allowed reproducing experimental data within 5% of the temperature span permitted in the equipment by the system control, which validated the model. The temperature variation was affected by the heterogeneity of the feeding and extraction processes, by the heterogeneity of the digestate recirculation through the heating system and by the lack of a perfect mixing inside the biodigester tank. The use of variable overall heat transfer coefficients improved the temperature change prediction and reduced the effect of a non-ideal performance of the pilot plant modeled.

  11. Separation of packaging plastics by froth flotation in a continuous pilot plant.

    PubMed

    Carvalho, Teresa; Durão, Fernando; Ferreira, Célia

    2010-11-01

    The objective of the research was to apply froth flotation to separate post-consumer PET (Polyethylene Terephthalate) from other packaging plastics with similar density, in a continuously operated pilot plant. A representative sample composed of 85% PET, 2.5% PVC (Polyvinyl Chloride) and 11.9% PS (Polystyrene) was subjected to a combination of alkaline treatment and surfactant adsorption followed by froth flotation. A mineral processing pilot plant, owned by a Portuguese mining company, was adapted for this purpose. The experimentation showed that it is possible to produce an almost pure concentrate of PET, containing 83% of the PET in feed, in a single bank of mechanical flotation cells. The concentrate grade attained was 97.2% PET, 1.1% PVC and 1.1% PS. By simulation it was shown that the Portuguese recycling industry specifications can be attained if one cleaning and one scavenger stages are added to the circuit. Copyright © 2010 Elsevier Ltd. All rights reserved.

  12. MBR pilot plant for textile wastewater treatment and reuse.

    PubMed

    Lubello, C; Caffaz, S; Mangini, L; Santianni, D; Caretti, C

    2007-01-01

    An experimental study was carried out in order to evaluate the possibility of upgrading the conventional activated sludge WWTP of Seano (Prato, Italy) which treats municipal and textile wastewaters, by using membrane bioreactor (MBR) technology. The MBR pilot plant, set up within Seano WWTP, was fed with mixed municipal-industrial wastewaters during the first experimental period and with pure industrial wastewaters during the second. Performances and operation of the MBR were evaluated in terms of permeate characteristics and variability (COD, colour, surfactants, total N and P) and other operational parameters (sludge growth and observed yield). According to the experimental results the MBR permeate quality was always superior to the Seano WWTP one and it was suitable for industrial reuse in the textile district of the Prato area. Respirometric tests provided a modified IWA ASM1 model which fits very well the experimental data and can be used for the design and the monitoring of a full-scale MBR pilot plant.

  13. 44 CFR 59.30 - A pilot inspection procedure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false A pilot inspection procedure... PROVISIONS Pilot Inspection Program § 59.30 A pilot inspection procedure. (a) Purpose. This section sets forth the criteria for implementing a pilot inspection procedure in Monroe County and the Village of...

  14. 44 CFR 59.30 - A pilot inspection procedure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false A pilot inspection procedure... PROVISIONS Pilot Inspection Program § 59.30 A pilot inspection procedure. (a) Purpose. This section sets forth the criteria for implementing a pilot inspection procedure in Monroe County and the Village of...

  15. Impact of exercise programs among helicopter pilots with transient LBP.

    PubMed

    Andersen, Knut; Baardsen, Roald; Dalen, Ingvild; Larsen, Jan Petter

    2017-06-20

    Flight related low back pain (LBP) among helicopter pilots is frequent and may influence flight performance. Prolonged confined sitting during flights seems to weaken lumbar trunk (LT) muscles with associated secondary transient pain. Aim of the study was to investigate if structured training could improve muscular function and thus improve LBP related to flying. 39 helicopter pilots (35 men and 4 women), who reported flying related LBP on at least 1 of 3 missions last month, were allocated to two training programs over a 3-month period. Program A consisted of 10 exercises recommended for general LBP. Program B consisted of 4 exercises designed specifically to improve LT muscular endurance. The pilots were examined before and after the training using questionnaires for pain, function, quality of health and tests of LT muscular endurance as well as ultrasound measurements of the contractility of the lumbar multifidus muscle (LMM). Approximately half of the participants performed the training per-protocol. Participants in this subset group had comparable baseline characteristics as the total study sample. Pre and post analysis of all pilots included, showed participants had marked improvement in endurance and contractility of the LMM following training. Similarly, participants had improvement in function and quality of health. Participants in program B had significant improvement in pain, function and quality of health. This study indicates that participants who performed a three months exercise program had improved muscle endurance at the end of the program. The helicopter pilots also experienced improved function and quality of health. Identifier: NCT01788111 Registration date; February 5th, 2013, verified April 2016.

  16. Hydrometallurgical recovery of germanium from coal gasification fly ash: pilot plant scale evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arroyo, F.; Fernandez-Pereira, C.; Olivares, J.

    2009-04-15

    In this article, a hydrometallurgical method for the selective recovery of germanium from fly ash (FA) has been tested at pilot plant scale. The pilot plant flowsheet comprised a first stage of water leaching of FA, and a subsequent selective recovery of the germanium from the leachate by solvent extraction method. The solvent extraction method was based on Ge complexation with catechol in an aqueous solution followed by the extraction of the Ge-catechol complex (Ge(C{sub 6}H{sub 4}O{sub 2}){sub 3}{sup 2-}) with an extracting organic reagent (trioctylamine) diluted in an organic solvent (kerosene), followed by the subsequent stripping of the organicmore » extract. The process has been tested on a FA generated in an integrated gasification with combined cycle (IGCC) process. The paper describes the designed 5 kg/h pilot plant and the tests performed on it. Under the operational conditions tested, approximately 50% of germanium could be recovered from FA after a water extraction at room temperature. Regarding the solvent extraction method, the best operational conditions for obtaining a concentrated germanium-bearing solution practically free of impurities were as follows: extraction time equal to 20 min; aqueous phase/organic phase volumetric ratio equal to 5; stripping with 1 M NaOH, stripping time equal to 30 min, and stripping phase/organic phase volumetric ratio equal to 5. 95% of germanium were recovered from water leachates using those conditions.« less

  17. Evaluation and Testing of IONSIV IE-911 for the Removal of Cesium-137 from INEEL Tank Waste and Dissolved Calcines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N. R. Mann; T. A. Todd; K. N. Brewer

    1999-04-01

    Development of waste treatment processes for the remediation of radioactive wastes is currently underway. A number of experiments were performed at the Idaho Nuclear Technology and Environmental Center (INTEC) located at the Idaho National Engineering and Environmental Laboratory (INEEL) with the commercially available sorbent material, IONSIV IE-911, crystalline silicotitanate (CST), manufactured by UOP LLC. The purpose of this work was to evaluate the removal efficiency, sorbent capacity and selectivity of CST for removing Cs-137 from actual and simulated acidic tank waste in addition to dissolved pilot-plant calcine solutions. The scope of this work included batch contact tests performed with non-radioactivemore » dissolved Al and Run-64 pilot plant calcines in addition to simulants representing the average composition of tank waste. Small-scale column tests were performed with actual INEEL tank WM-183 waste, tank waste simulant, dissolved Al and Run-64 pilot plant calcine solutions. Small-scale column experiments using actual WM-183 tank waste resulted in fifty-percent Cs-137 breakthrough at approximately 589 bed volumes. Small-scale column experiments using the tank waste simulant displayed fifty-percent Cs-137 breakthrough at approximately 700 bed volumes. Small-scale column experiments using dissolved Al calcine simulant displayed fifty-percent Cs-137 breakthrough at approximately 795 bed volumes. Column experiments with dissolved Run-64, pilot plant calcine did not reach fifty-percent breakthrough throughout the test.« less

  18. The development of the MELiSSA Pilot Plant Facility

    NASA Astrophysics Data System (ADS)

    Godia, Francesc; Dussap, Claude-Gilles; Dixon, Mike; Peiro, Enrique; Fossen, Arnaud; Lamaze, Brigitte; Brunet, Jean; Demey, Dries; Mas-Albaigès, Joan L.

    MELiSSA (Micro-Ecological Life Support System Alternative) is a closed artificial ecosystem intended as a tool for the development of a bio-regenerative life support system for longterm manned missions. The MELiSSA loop is formed by five interconnected compartments, organized in three different loops (solid, liquid and gas). This compartments are microbial bioreactors and higher plant chambers. The MELiSSA Pilot Plant facility has been designed to achieve the preliminary terrestrial demonstration of the MELiSSA concept at pilot scale, using animals as a model for the crew compartent. The experience gained in the operation of such a facility will be highly relevant for planning future life support systems in Space. In this communication, the latests developments in the MELiSSA Pilot Plant will be reported. Particularly, the completion of the design phase and instalation of all the different compartments will be discussed in detail. Each of the compartments had to be designed and constructed according to very specific characteristics, associated to the biological systems to be cultured, as part of the complete MELiSSA loop (anerobic, oxygenic, thermophilic, heterotrophic, autotrophic, axenic, photosynthetic, etc.). Additionally, the sizing of each reactor (ranging from 8 to 100 Liters, depending of each particular compartment) should compile with the global integration scenario proposed, and with the final goal of connection of all compartments to provide a demonstration of the MELiSSA concept, and generate data for the design and operation of future biological life support systems.

  19. 76 FR 77716 - Alternate Passenger Rail Service Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... program that permits a rail carrier or rail carriers that own infrastructure over which Amtrak operates... develops a pilot program that permits a rail carrier or rail carriers that own infrastructure over which... the infrastructure as described in Sec. 269.7 of this final rule. In addition, such information...

  20. 76 FR 19174 - State Trade and Export Promotion (STEP) Pilot Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-06

    ... SMALL BUSINESS ADMINISTRATION State Trade and Export Promotion (STEP) Pilot Grant Program AGENCY... No. OIT-STEP-2011-01, Modification 1. SUMMARY: Program announcement No. OIT-STEP-2011-01 has been... to the date of application submission for a STEP grant.] Section IV A. 1, Governor's Letter of...

Top