Sample records for pipeline simulation facility

  1. Simulation of pipeline in the area of the underwater crossing

    NASA Astrophysics Data System (ADS)

    Burkov, P.; Chernyavskiy, D.; Burkova, S.; Konan, E. C.

    2014-08-01

    The article studies stress-strain behavior of the main oil-pipeline section Alexandrovskoye-Anzhero-Sudzhensk using software system Ansys. This method of examination and assessment of technical conditions of objects of pipeline transport studies the objects and the processes that affect the technical condition of these facilities, including the research on the basis of computer simulation. Such approach allows to develop the theory, methods of calculations and designing of objects of pipeline transport, units and parts of machines, regardless of their industry and destination with a view to improve the existing constructions and create new structures, machines of high performance, durability and reliability, maintainability, low material capacity and cost, which have competitiveness on the world market.

  2. SPOKES: An end-to-end simulation facility for spectroscopic cosmological surveys

    DOE PAGES

    Nord, B.; Amara, A.; Refregier, A.; ...

    2016-03-03

    The nature of dark matter, dark energy and large-scale gravity pose some of the most pressing questions in cosmology today. These fundamental questions require highly precise measurements, and a number of wide-field spectroscopic survey instruments are being designed to meet this requirement. A key component in these experiments is the development of a simulation tool to forecast science performance, define requirement flow-downs, optimize implementation, demonstrate feasibility, and prepare for exploitation. We present SPOKES (SPectrOscopic KEn Simulation), an end-to-end simulation facility for spectroscopic cosmological surveys designed to address this challenge. SPOKES is based on an integrated infrastructure, modular function organization, coherentmore » data handling and fast data access. These key features allow reproducibility of pipeline runs, enable ease of use and provide flexibility to update functions within the pipeline. The cyclic nature of the pipeline offers the possibility to make the science output an efficient measure for design optimization and feasibility testing. We present the architecture, first science, and computational performance results of the simulation pipeline. The framework is general, but for the benchmark tests, we use the Dark Energy Spectrometer (DESpec), one of the early concepts for the upcoming project, the Dark Energy Spectroscopic Instrument (DESI). As a result, we discuss how the SPOKES framework enables a rigorous process to optimize and exploit spectroscopic survey experiments in order to derive high-precision cosmological measurements optimally.« less

  3. 40 CFR 63.11089 - What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station... if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station, or pipeline...

  4. 78 FR 41991 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice; Issuance of Advisory... Gas and Hazardous Liquid Pipeline Systems. Subject: Potential for Damage to Pipeline Facilities Caused...

  5. A comprehensive probabilistic analysis model of oil pipelines network based on Bayesian network

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Qin, T. X.; Jiang, B.; Huang, C.

    2018-02-01

    Oil pipelines network is one of the most important facilities of energy transportation. But oil pipelines network accident may result in serious disasters. Some analysis models for these accidents have been established mainly based on three methods, including event-tree, accident simulation and Bayesian network. Among these methods, Bayesian network is suitable for probabilistic analysis. But not all the important influencing factors are considered and the deployment rule of the factors has not been established. This paper proposed a probabilistic analysis model of oil pipelines network based on Bayesian network. Most of the important influencing factors, including the key environment condition and emergency response are considered in this model. Moreover, the paper also introduces a deployment rule for these factors. The model can be used in probabilistic analysis and sensitive analysis of oil pipelines network accident.

  6. 75 FR 72877 - Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... liquid pipelines, and liquefied natural gas (LNG) facilities. These revisions will enhance PHMSA's... of natural gas pipelines, hazardous liquid pipelines, and LNG facilities. Specifically, PHMSA... commodity transported, and type of commodity transported. 8. Modify hazardous liquid operator telephonic...

  7. 49 CFR 193.2001 - Scope of part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... LNG facilities used in the transportation of gas by pipeline that is subject to the pipeline safety...

  8. 77 FR 34457 - Pipeline Safety: Mechanical Fitting Failure Reports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... notice provides clarification to owners and operators of gas distribution pipeline facilities when... of a gas distribution pipeline facility to file a written report for any mechanical fitting failure...

  9. 77 FR 61826 - Pipeline Safety: Communication During Emergency Situations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-11

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... liquefied natural gas pipeline facilities that operators should immediately and directly notify the Public.... Background Federal regulations for gas, liquefied natural gas (LNG), and hazardous liquid pipeline facilities...

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nord, B.; Amara, A.; Refregier, A.

    The nature of dark matter, dark energy and large-scale gravity pose some of the most pressing questions in cosmology today. These fundamental questions require highly precise measurements, and a number of wide-field spectroscopic survey instruments are being designed to meet this requirement. A key component in these experiments is the development of a simulation tool to forecast science performance, define requirement flow-downs, optimize implementation, demonstrate feasibility, and prepare for exploitation. We present SPOKES (SPectrOscopic KEn Simulation), an end-to-end simulation facility for spectroscopic cosmological surveys designed to address this challenge. SPOKES is based on an integrated infrastructure, modular function organization, coherentmore » data handling and fast data access. These key features allow reproducibility of pipeline runs, enable ease of use and provide flexibility to update functions within the pipeline. The cyclic nature of the pipeline offers the possibility to make the science output an efficient measure for design optimization and feasibility testing. We present the architecture, first science, and computational performance results of the simulation pipeline. The framework is general, but for the benchmark tests, we use the Dark Energy Spectrometer (DESpec), one of the early concepts for the upcoming project, the Dark Energy Spectroscopic Instrument (DESI). As a result, we discuss how the SPOKES framework enables a rigorous process to optimize and exploit spectroscopic survey experiments in order to derive high-precision cosmological measurements optimally.« less

  11. 30 CFR 250.1012 - Required payments for pipeline right-of-way holders.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., pipeline risers, and other facilities and devices associated with the accessory. (2) Your accessory site is... rental includes the areal extent of anchor chains, pipeline risers, and other facilities and devices...

  12. 30 CFR 250.1012 - Required payments for pipeline right-of-way holders.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., pipeline risers, and other facilities and devices associated with the accessory. (2) Your accessory site is... rental includes the areal extent of anchor chains, pipeline risers, and other facilities and devices...

  13. 30 CFR 250.1012 - Required payments for pipeline right-of-way holders.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., pipeline risers, and other facilities and devices associated with the accessory. (2) Your accessory site is... rental includes the areal extent of anchor chains, pipeline risers, and other facilities and devices...

  14. 78 FR 15715 - Excelerate Liquefaction Solutions I, LLC; Lavaca Bay Pipeline System, LLC; Notice of Intent To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ... natural gas from existing pipeline systems to the LNG terminal facilities. The Project would be... room, warehouse, and shop. Pipeline Header System: A 29-mile-long, 42-inch-diameter natural gas pipeline extending northward from the shoreside facilities to nine natural gas interconnects southwest of...

  15. 30 CFR 250.1700 - What do the terms “decommissioning”, “obstructions”, and “facility” mean?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pipeline risers, platforms, templates, pilings, pipelines, pipeline valves, and power cables. (c) Facility... risers, templates, pilings, and any other facility or equipment that constitutes an obstruction such as...

  16. 49 CFR 192.727 - Abandonment or deactivation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Abandonment or deactivation of facilities. 192.727... Abandonment or deactivation of facilities. (a) Each operator shall conduct abandonment or deactivation of... pipeline facility or each abandoned onshore pipeline facility that crosses over, under or through a...

  17. 49 CFR 195.59 - Abandonment or deactivation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Abandonment or deactivation of facilities. 195.59... Abandonment or deactivation of facilities. For each abandoned offshore pipeline facility or each abandoned onshore pipeline facility that crosses over, under or through a commercially navigable waterway, the last...

  18. 75 FR 2134 - Northern Border Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... consist of the following facilities: Approximately 8.9 miles of 16-inch-diameter pipeline; One pig\\1\\ launcher assembly; and \\1\\ A pipeline ``pig'' is a device designed to internally clean or inspect the pipeline. A pig launcher/receiver is an aboveground facility where pigs are inserted or retrieved from the...

  19. 18 CFR 157.21 - Pre-filing procedures and review process for LNG terminal facilities and other natural gas...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the pre-filing review of any pipeline or other natural gas facilities, including facilities not... from the subject LNG terminal facilities to the existing natural gas pipeline infrastructure. (b) Other... and review process for LNG terminal facilities and other natural gas facilities prior to filing of...

  20. Evaluation of Modern Navies’ Damage Control and Firefighting Training using Simulator Platforms

    DTIC Science & Technology

    2011-09-01

    Figure 18 below is a two-story concrete structure including holes in bulkheads, ruptured pipelines, and almost all situations that can cause flooding...the four simulators address Class A, B, and C fires. The first one—the “Basic Firefighting Trainer”—is a single-story concrete structure with four...Figure 19—is a three-story concrete structure that houses berthing facilities, engine rooms, storage compartments and electrical and engine room mock

  1. 78 FR 18970 - Trunkline LNG Company, LLC; Trunkline LNG Export, LLC; Trunkline Gas Company, LLC; Supplemental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... include plans to construct and modify certain pipeline facilities to supply natural gas to the..., Louisiana to supply natural gas to the liquefaction facility from existing gas transmission pipelines... greenfield natural gas pipeline (Mainline Connector) in Jefferson Davis and Calcasieu Parishes, Louisiana...

  2. Monitoring of pipeline ruptures by means of a Robust Satellite Technique (RST)

    NASA Astrophysics Data System (ADS)

    Filizzola, C.; Baldassarre, G.; Corrado, R.; Mazzeo, G.; Marchese, F.; Paciello, R.; Pergola, N.; Tramutoli, V.

    2009-04-01

    Pipeline ruptures have deep economic and ecologic consequences so that pipeline networks represent critical infrastructures to be carefully monitored particularly in areas which are frequently affected by natural disasters like earthquakes, hurricanes, landslide, etc. In order to minimize damages, the detection of harmful events along pipelines should be as rapid as possible and, at the same time, what is detected should be an actual incident and not a false alarm. In this work, a Robust Satellite Technique (RST), already applied to the prevision and NRT (Near Real Time) monitoring of major natural and environmental hazards (such as seismically active areas, volcanic activity, hydrological risk, forest fires and oil spills) has been employed to automatically identify, from satellite, anomalous Thermal Infrared (TIR) transients related to explosions of oil/gas pipelines. In this context, the combination of the RST approach with high temporal resolution, offered by geostationary satellites, seems to assure both a reliable and timely detection of such events. The potentials of the technique (applied to MSG-SEVIRI data) were tested over Iraq, a region which is sadly known for the numerous (mainly manmade) accidents to pipelines, in order to have a simulation of the effects (such as fires or explosions near or directly involving a pipeline facility) due to natural disasters.

  3. 76 FR 73570 - Pipeline Safety: Miscellaneous Changes to Pipeline Safety Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... pipeline facilities to facilitate the removal of liquids and other materials from the gas stream. These... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... Changes to Pipeline Safety Regulations AGENCY: Pipeline and Hazardous Materials Safety Administration...

  4. 43 CFR 2885.14 - What happens if I need a right-of-way wider than 50 feet plus the ground occupied by the pipeline...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... wider than 50 feet plus the ground occupied by the pipeline and related facilities? 2885.14 Section 2885... feet plus the ground occupied by the pipeline and related facilities? (a) You may apply to BLM at any time for a right-of-way wider than 50 feet plus the ground occupied by the pipeline and related...

  5. 76 FR 56009 - Mandatory Reporting of Greenhouse Gases: Technical Revisions to the Electronics Manufacturing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Pipeline transportation of natural gas. 221210 Natural gas distribution facilities. 211 Extractors of crude... natural gas processing facilities in transmission pipelines or into storage. 40 CFR Sec. 98.230(a)(4). A... and inaccuracies in reporting''. Pipeline Quality Yes. Natural Gas. CEC/ AXPC asserted that ``[t]here...

  6. 78 FR 46560 - Pipeline Safety: Class Location Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Part... class location requirements for gas transmission pipelines. Section 5 of the Pipeline Safety, Regulatory... and, with respect to gas transmission pipeline facilities, whether applying IMP requirements to...

  7. 77 FR 45417 - Pipeline Safety: Inspection and Protection of Pipeline Facilities After Railway Accidents

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-31

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Accidents AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. [[Page 45418

  8. 49 CFR 195.426 - Scraper and sphere facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Scraper and sphere facilities. 195.426 Section 195.426 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... HAZARDOUS LIQUIDS BY PIPELINE Operation and Maintenance § 195.426 Scraper and sphere facilities. No operator...

  9. 77 FR 26353 - Notice of Availability of the Environmental Assessment and Request for Comments on Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... a liquid form at an existing natural gas facility in North Dakota. The ethane that would be... maintenance of pipeline facilities of natural gas liquids and also evaluates reasonable alternatives to the... Pipeline Project would be an underground high vapor pressure pipeline that would carry liquid ethane from...

  10. 77 FR 26822 - Pipeline Safety: Verification of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2012-0068] Pipeline Safety: Verification of Records AGENCY: Pipeline and Hazardous Materials... issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities to verify...

  11. Leakage Risk Assessment of CO{sub 2} Transportation by Pipeline at the Illinois Basin Decatur Project, Decatur, Illinois

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mazzoldi, A.; Oldenburg, C. M.

    The Illinois Basin Decatur Project (IBDP) is designed to confirm the ability of the Mt. Simon Sandstone, a major regional saline-water-bearing formation in the Illinois Basin, to store 1 million tons of carbon dioxide (CO{sub 2}) injected over a period of three years. The CO{sub 2} will be provided by Archer Daniels Midland (ADM) from its Decatur, Illinois, ethanol plant. In order to transport CO{sub 2} from the capture facility to the injection well (also located within the ADM plant boundaries), a high-pressure pipeline of length 3,200 ft (975 m) has been constructed, running above the ground surface within themore » ADM plant footprint. We have qualitatively evaluated risks associated with possible pipeline failure scenarios that lead to discharge of CO{sub 2} within the real-world environment of the ADM plant in which there are often workers and visitors in the vicinity of the pipeline. There are several aspects of CO{sub 2} that make its transportation and potential leakage somewhat different from other substances, most notable is its non-flammability and propensity to change to solid (dry ice) upon strong decompression. In this study, we present numerical simulations using Computational Fluid Dynamics (CFD) methods of the release and dispersion of CO{sub 2} from individual hypothetical pipeline failures (i.e., leaks). Failure frequency of the various components of a pipeline transportation system over time are taken from prior work on general pipeline safety and leakage modeling and suggest a 4.65% chance of some kind of pipeline failure over the three-years of operation. Following the Precautionary Principle (see below), we accounted for full-bore leakage scenarios, where the temporal evolution of the mass release rate from the high-pressure pipeline leak locations was simulated using a state-of-the-art Pipe model which considers the thermodynamic effects of decompression in the entire pipeline. Failures have been simulated at four representative locations along the pipeline route within the ADM plant. Leakage scenarios at sites along the route of the pipeline, where plant operations (e.g., vehicular and train transportation) seem to present a higher likelihood of accidental failure, for example due to vehicles or equipment crashing into the pipeline and completely severing it, were modeled by allowing them to have a double source consistent with the pipeline releasing high-pressure CO{sub 2} from both ends of the broken pipe after a full-bore offset rupture. Simulation results show that the built environment of the plant plays a significant role in the dispersion of the gas as leaking CO{sub 2} can impinge upon buildings and other infrastructure. In all scenarios simulated, the region of very high-concentration of CO{sub 2} is limited to a small area around the pipeline failure, suggesting the likelihood of widespread harmful CO{sub 2} exposure to plant personnel from pipeline leakage is low. An additional risk is posed by the blast wave that emanates from a high-pressure pipeline when it is breached quickly. We estimate the blast wave risk as low because it occurs only for a short time in the immediate vicinity of the rupture, and requires an instantaneous large-scale rupture to occur. We recommend consideration of signage and guard rails and posts to mitigate the likelihood of vehicles crashing into the pipeline. A standardized emergency response plan applicable to capture plants within industrial sites could be developed based on the IBDP that would be useful for other capture plants. Finally, we recommend carrying out coupled wellbore-reservoir blowout scenario modeling to understand the potential for hazardous conditions arising from an unexpected blowout at the wellhead.« less

  12. 75 FR 73160 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No...-Related Conditions on Gas, Hazardous Liquid, and Carbon Dioxide Pipelines and Liquefied Natural Gas... Pipelines and Liquefied Natural Gas Facilities.'' The Pipeline Safety Laws (49 U.S.C. 60132) require each...

  13. 75 FR 9018 - Pipeline Safety: Random Drug Testing Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2010-0034] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  14. 77 FR 2606 - Pipeline Safety: Random Drug Testing Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0004] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  15. 49 CFR 193.2005 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES..., design, installation, or construction of LNG facilities (including material incorporated by reference in...

  16. 76 FR 19349 - Dominion Transmission, Inc.; Notice of Availability of the Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... Project includes the following facilities: Pipeline Facilities the 5.3 miles, 20-inch-diameter TL-570, EXT... Greene County, Pennsylvania; the 42.3 mile 30-inch-diameter TL-590 pipeline in Marshall and Greene...; the 0.3 mile, 16-inch-diameter TL-598 pipeline in Harrison County, West Virginia; the 0.4 mile, 16...

  17. 76 FR 78631 - Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... are currently exposed, which would be removed. Questar would also construct a pig launcher/receiver \\1\\ facility at its new Mainline 103/68 junction. \\1\\ A pipeline ``pig'' is a device used to clean or inspect the pipeline. A pig launcher/receiver is an aboveground facility where pigs are inserted or retrieved...

  18. 75 FR 5640 - Pipeline Safety: Implementation of Revised Incident/Accident Report Forms for Distribution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... Distribution Systems, Gas Transmission and Gathering Systems, and Hazardous Liquid Systems AGENCY: Pipeline and.... SUMMARY: This notice advises owners and operators of gas pipeline facilities and hazardous liquid pipeline...

  19. 75 FR 67807 - Pipeline Safety: Emergency Preparedness Communications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... is issuing an Advisory Bulletin to remind operators of gas and hazardous liquid pipeline facilities... Gas Pipeline Systems. Subject: Emergency Preparedness Communications. Advisory: To further enhance the...

  20. 75 FR 36773 - Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    .... PHMSA-2010-0175] Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil... 194. In light of the Deepwater Horizon oil spill in the Gulf of Mexico, which has resulted in the... Systems. Subject: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill. Advisory...

  1. 30 CFR 285.912 - After I remove a facility, cable, or pipeline, what information must I submit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false After I remove a facility, cable, or pipeline, what information must I submit? 285.912 Section 285.912 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER...

  2. 77 FR 14010 - Millennium Pipeline Company, LLC; Notice of Availability of the Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... emergency electrical power generator. Pipeline facilities required for the project include approximately 545 feet of new 36-inch- diameter suction and discharge pipelines which would connect the compressor... pipeline located between the new suction and discharge pipelines. The FERC staff mailed copies of the EA to...

  3. 77 FR 75699 - Pipeline Safety: Reporting of Exceedances of Maximum Allowable Operating Pressure

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No... AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice; Issuance of... occurs. This reporting requirement is applicable to all gas transmission pipeline facility owners and...

  4. 78 FR 6402 - Pipeline Safety: Accident and Incident Notification Time Limit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No.... SUMMARY: Owners and operators of gas and hazardous liquid pipeline systems and liquefied natural gas (LNG... operators of gas and hazardous liquids pipeline systems and LNG facilities that, ``at the earliest...

  5. 40 CFR 63.11088 - What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11088 What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

  6. 40 CFR 63.11087 - What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11087 What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

  7. 40 CFR 63.11087 - What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11087 What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

  8. 40 CFR 63.11087 - What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11087 What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

  9. 40 CFR 63.11088 - What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11088 What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

  10. 40 CFR 63.11088 - What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11088 What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

  11. 40 CFR 63.11087 - What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11087 What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

  12. 40 CFR 63.11088 - What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11088 What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

  13. 40 CFR 63.11087 - What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... gasoline storage tanks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11087 What requirements must I meet for gasoline storage tanks if my facility is a bulk gasoline...

  14. 40 CFR 63.11088 - What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... gasoline loading racks if my facility is a bulk gasoline terminal, pipeline breakout station, or pipeline... CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Source Category: Gasoline... § 63.11088 What requirements must I meet for gasoline loading racks if my facility is a bulk gasoline...

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, E.E.

    Molten wax shows considerable promise as a fixative and dust control agent in demolition of radioactively contaminated facilities. Sticky molten wax, modified with special surfactants and wetting agents, is capable of not only coating materials but also penetrating into friable or dusty materials and making them incapable of becoming airborne during demolition. Wax also shows significant promise for stabilization of waste residuals that may be contained in buildings undergoing demolition. Some of the building materials that have been tested to date include concrete, wood, sheet-rock, fiber insulation, lime, rock, and paper. Protective clothing, clay, sand, sulfur, and bentonite clay havemore » been tested as surrogates for certain waste materials that may be encountered during building demolition. The paper describes several potential applications of molten wax for dust control in demolition of radioactive contaminated facilities. As a case-study, this paper describes a research test performed for a pipeline closure project being completed by the Idaho Cleanup Project at the Idaho National Laboratory. The project plans to excavate and remove a section of buried Duriron drain piping containing highly radioactive and friable and 'flighty' waste residuals. A full-scale pipeline mockup containing simulated waste was buried in sand to simulate the direct-buried subsurface condition of the subject piping. The pipeline was pre-heated by drawing hot air through the line with a HEPA vacuum blower unit. Molten wax was pumped into the line and allowed to cool. The line was then broken apart in various places to evaluate the permeation performance of the wax. The wax fully permeated all the surrogate materials rendering them non-friable with a consistency similar to modeling clay. Based on the performance during the mockup, it is anticipated that the wax will be highly effective in controlling the spread of radiological contamination during pipe demolition activities. A larger test was completed this year to simulate the work in more realistic conditions. (authors)« less

  16. 49 CFR 193.2007 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... Administrator, Pipeline and Hazardous Materials Safety Administration or his or her delegate. Ambient vaporizer...

  17. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  18. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  19. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  20. 43 CFR 3271.13 - How do I obtain approval to build pipelines and facilities connecting the well field to...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false How do I obtain approval to build pipelines and facilities connecting the well field to utilization facilities not located on Federal lands leased for geothermal resources? 3271.13 Section 3271.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, E.E.; Welty, B.D.

    Molten wax shows considerable promise as a fixative and dust control agent in demolition of radioactively contaminated facilities. Sticky molten wax, modified with special surfactants and wetting agents, is capable of not only coating materials but also penetrating into friable or dusty materials and making them incapable of becoming airborne during demolition. Wax also shows significant promise for stabilization of waste residuals that may be contained in buildings undergoing demolition. Some of the building materials that have been tested to date include concrete, wood, sheet rock, fiber insulation, lime, rock, and paper. Protective clothing, clay, sand, sulfur, and bentonite claymore » have been tested as surrogates for certain waste materials that may be encountered during building demolition. The paper describes several potential applications of molten wax for dust control in demolition of radioactive contaminated facilities. As a case-study, this paper describes a research test performed for a pipeline closure project being completed by the Idaho Cleanup Project at the Idaho National Laboratory. The project plans to excavate and remove a section of buried Duriron drain piping containing highly radioactive and friable and 'flighty' waste residuals. A full-scale pipeline mockup containing simulated waste was buried in sand to simulate the direct buried subsurface condition of the subject piping. The pipeline was pre-heated by drawing hot air through the line with a HEPA vacuum blower unit. Molten wax was pumped into the line and allowed to cool. The line was then broken apart in various places to evaluate the permeation performance of the wax. The wax fully permeated all the surrogate materials rendering them non-friable with a consistency similar to modeling clay. Based on the performance during the mockup, it is anticipated that the wax will be highly effective in controlling the spread of radiological contamination during pipe demolition activities. (authors)« less

  2. 40 CFR 63.11080 - What is the purpose of this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities What This Subpart Covers § 63.11080 What is... practices for hazardous air pollutants (HAP) emitted from area source gasoline distribution bulk terminals, bulk plants, and pipeline facilities. This subpart also establishes requirements to demonstrate...

  3. 40 CFR 63.11100 - What definitions apply to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Other Requirements and Information § 63.11100... authority to implement the provisions of this subpart). Bulk gasoline plant means any gasoline storage and distribution facility that receives gasoline by pipeline, ship or barge, or cargo tank and has a gasoline...

  4. 76 FR 54531 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by the Passage of Hurricanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... production and processing is prone to disruption by hurricanes. In 2005, Hurricanes Katrina and Rita caused... Hurricanes AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice... the passage of Hurricanes. ADDRESSES: This document can be viewed on the Office of Pipeline Safety...

  5. Stress and Strain State Analysis of Defective Pipeline Portion

    NASA Astrophysics Data System (ADS)

    Burkov, P. V.; Burkova, S. P.; Knaub, S. A.

    2015-09-01

    The paper presents computer simulation results of the pipeline having defects in a welded joint. Autodesk Inventor software is used for simulation of the stress and strain state of the pipeline. Places of the possible failure and stress concentrators are predicted on the defective portion of the pipeline.

  6. NASA Virtual Glovebox: An Immersive Virtual Desktop Environment for Training Astronauts in Life Science Experiments

    NASA Technical Reports Server (NTRS)

    Twombly, I. Alexander; Smith, Jeffrey; Bruyns, Cynthia; Montgomery, Kevin; Boyle, Richard

    2003-01-01

    The International Space Station will soon provide an unparalleled research facility for studying the near- and longer-term effects of microgravity on living systems. Using the Space Station Glovebox Facility - a compact, fully contained reach-in environment - astronauts will conduct technically challenging life sciences experiments. Virtual environment technologies are being developed at NASA Ames Research Center to help realize the scientific potential of this unique resource by facilitating the experimental hardware and protocol designs and by assisting the astronauts in training. The Virtual GloveboX (VGX) integrates high-fidelity graphics, force-feedback devices and real- time computer simulation engines to achieve an immersive training environment. Here, we describe the prototype VGX system, the distributed processing architecture used in the simulation environment, and modifications to the visualization pipeline required to accommodate the display configuration.

  7. 78 FR 50077 - Intent To Request Renewal From OMB of One Current Public Collection of Information: Pipeline...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... maps, security plans, etc.); and Actual or suspected cyber-attacks that could impact pipeline... suspected attacks on pipeline systems, facilities, or assets; Bomb threats or weapons of mass destruction...

  8. 49 CFR 193.2019 - Mobile and temporary LNG facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 193.2019 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY... during gas pipeline systems repair/alteration, or for other short term applications need not meet the...

  9. 49 CFR 193.2017 - Plans and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... submitted a current certification or agreement with respect to the plant under the pipeline safety laws (49...

  10. 49 CFR 193.2513 - Transfer procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... transfer position; and (7) Verify that transfers into a pipeline system will not exceed the pressure or...

  11. 76 FR 44985 - Pipeline Safety: Potential for Damage to Pipeline Facilities Caused by Flooding

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-27

    ... Bulletin. SUMMARY: PHMSA is issuing this advisory bulletin to all owners and operators of gas and hazardous..., Nevada, Oregon, Utah, Washington, and Wyoming, call 720-963-3160. Intrastate pipeline operators should... failure near [[Page 44986

  12. 77 FR 60981 - Kinder Morgan Interstate Gas Transmission L.L.C.; Notice of Intent To Prepare an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Pony Express Pipeline Conversion Project and Request for Comments on Environmental Issues The staff of... (EA) that will discuss the environmental impacts of the Pony Express Pipeline Conversion Project involving conversion of facilities from natural gas to oil and construction and operation of new facilities...

  13. 78 FR 63176 - Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... new ``y'' pipe intake off the existing 10-inch diameter water supply pipeline; (2) a new 12-foot-long... water supply pipeline; and (5) appurtenant facilities. The proposed project would have an estimated... 22 kW Orchard City Water Treatment Plant Hydroelectric Project would utilize Orchard City's water...

  14. Natural Gas Compressor Stations on the Interstate Pipeline Network: Developments Since 1996

    EIA Publications

    2007-01-01

    This special report looks at the use of natural gas pipeline compressor stations on the interstate natural gas pipeline network that serves the lower 48 states. It examines the compression facilities added over the past 10 years and how the expansions have supported pipeline capacity growth intended to meet the increasing demand for natural gas.

  15. 49 CFR 193.2101 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...] Materials ...

  16. The Application of Simulation Method in Isothermal Elastic Natural Gas Pipeline

    NASA Astrophysics Data System (ADS)

    Xing, Chunlei; Guan, Shiming; Zhao, Yue; Cao, Jinggang; Chu, Yanji

    2018-02-01

    This Elastic pipeline mathematic model is of crucial importance in natural gas pipeline simulation because of its compliance with the practical industrial cases. The numerical model of elastic pipeline will bring non-linear complexity to the discretized equations. Hence the Newton-Raphson method cannot achieve fast convergence in this kind of problems. Therefore A new Newton Based method with Powell-Wolfe Condition to simulate the Isothermal elastic pipeline flow is presented. The results obtained by the new method aregiven based on the defined boundary conditions. It is shown that the method converges in all cases and reduces significant computational cost.

  17. Improving the result of forcasting using reservoir and surface network simulation

    NASA Astrophysics Data System (ADS)

    Hendri, R. S.; Winarta, J.

    2018-01-01

    This study was aimed to get more representative results in production forcasting using integrated simulation in pipeline gathering system of X field. There are 5 main scenarios which consist of the production forecast of the existing condition, work over, and infill drilling. Then, it’s determined the best development scenario. The methods of this study is Integrated Reservoir Simulator and Pipeline Simulator so-calle as Integrated Reservoir and Surface Network Simulation. After well data result from reservoir simulator was then integrated with pipeline networking simulator’s to construct a new schedule, which was input for all simulation procedure. The well design result was done by well modeling simulator then exported into pipeline simulator. Reservoir prediction depends on the minimum value of Tubing Head Pressure (THP) for each well, where the pressure drop on the Gathering Network is not necessary calculated. The same scenario was done also for the single-reservoir simulation. Integration Simulation produces results approaching the actual condition of the reservoir and was confirmed by the THP profile, which difference between those two methods. The difference between integrated simulation compared to single-modeling simulation is 6-9%. The aimed of solving back-pressure problem in pipeline gathering system of X field is achieved.

  18. Cathodic protection of a remote river pipeline

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, B.A.

    1994-03-01

    The 261-km long 500-mm diam Kutubu pipeline, which runs through dense jungle swamps in Papua, New Guinea, was built for Chevron Niugini to transport oil from the remote Kutubu oil production facility in the Southern Highlands to an offshore loading facility. The pipeline was laid with a section in the bed of a wide, fast-flowing river. This section was subject to substantial telluric effects and current density variations from changing water resistivities. The cathodic protection system's effectiveness was monitored by coupon off'' potentials and required an innovative approach.

  19. Automatic Beam Path Analysis of Laser Wakefield Particle Acceleration Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rubel, Oliver; Geddes, Cameron G.R.; Cormier-Michel, Estelle

    2009-10-19

    Numerical simulations of laser wakefield particle accelerators play a key role in the understanding of the complex acceleration process and in the design of expensive experimental facilities. As the size and complexity of simulation output grows, an increasingly acute challenge is the practical need for computational techniques that aid in scientific knowledge discovery. To that end, we present a set of data-understanding algorithms that work in concert in a pipeline fashion to automatically locate and analyze high energy particle bunches undergoing acceleration in very large simulation datasets. These techniques work cooperatively by first identifying features of interest in individual timesteps,more » then integrating features across timesteps, and based on the information derived perform analysis of temporally dynamic features. This combination of techniques supports accurate detection of particle beams enabling a deeper level of scientific understanding of physical phenomena than hasbeen possible before. By combining efficient data analysis algorithms and state-of-the-art data management we enable high-performance analysis of extremely large particle datasets in 3D. We demonstrate the usefulness of our methods for a variety of 2D and 3D datasets and discuss the performance of our analysis pipeline.« less

  20. 77 FR 60416 - Questar Pipeline Company; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Pipeline Company; Notice of Application On September 18, 2012, Questar Pipeline Company (Questar) filed with the Federal Energy Regulatory Commission (Commission) an application under section 7(c) of the... facilities as more fully detailed in the Application. Questions concerning this application may be directed...

  1. 75 FR 20591 - AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC; Notice of Final General Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... quality impacts associated with the construction and operation of a liquefied natural gas (LNG) import terminal and natural gas pipeline proposed by AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC, in... of the following LNG terminal and natural gas pipeline facilities: A ship unloading facility, with...

  2. 49 CFR 195.1 - Which pipelines are covered by this part?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY... may petition the Administrator, under § 190.9 of this chapter, for approval to operate under PHMSA... non-pipeline mode of transportation; or (ii) Through facilities located on the grounds of a materials...

  3. 78 FR 46402 - Issuance of a Presidential Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ...: Department of State. ACTION: Notice of Issuance of a Presidential Permit for Vantage Pipeline US LP. SUMMARY: The Department of State issued a Presidential Permit to Vantage Pipeline US LP (``Vantage'') on July 16, 2013, authorizing Vantage to construct, connect, operate, and maintain pipeline facilities at the...

  4. 43 CFR 2801.9 - When do I need a grant?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., pipelines, tunnels, and other systems which impound, store, transport, or distribute water; (2) Pipelines and other systems for transporting or distributing liquids and gases, other than water and other than... and terminal facilities used in connection with them; (3) Pipelines, slurry and emulsion systems, and...

  5. 43 CFR 2801.9 - When do I need a grant?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., pipelines, tunnels, and other systems which impound, store, transport, or distribute water; (2) Pipelines and other systems for transporting or distributing liquids and gases, other than water and other than... and terminal facilities used in connection with them; (3) Pipelines, slurry and emulsion systems, and...

  6. 43 CFR 2801.9 - When do I need a grant?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., pipelines, tunnels, and other systems which impound, store, transport, or distribute water; (2) Pipelines and other systems for transporting or distributing liquids and gases, other than water and other than... and terminal facilities used in connection with them; (3) Pipelines, slurry and emulsion systems, and...

  7. 43 CFR 2801.9 - When do I need a grant?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., pipelines, tunnels, and other systems which impound, store, transport, or distribute water; (2) Pipelines and other systems for transporting or distributing liquids and gases, other than water and other than... and terminal facilities used in connection with them; (3) Pipelines, slurry and emulsion systems, and...

  8. 77 FR 12278 - Questar Pipeline Company; Notice of Availability of the Environmental Assessment for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... Mainline 103; and Construct a pig launcher/receiver \\1\\ at the new Mainline 103/68 junction. \\1\\ A pipeline ``pig'' is a device used to clean or inspect the pipeline. A pig launcher/receiver is an aboveground facility where pigs are inserted or retrieved from the pipeline. The FERC staff mailed copies of the EA to...

  9. Research on numerical simulation and protection of transient process in long-distance slurry transportation pipelines

    NASA Astrophysics Data System (ADS)

    Lan, G.; Jiang, J.; Li, D. D.; Yi, W. S.; Zhao, Z.; Nie, L. N.

    2013-12-01

    The calculation of water-hammer pressure phenomenon of single-phase liquid is already more mature for a pipeline of uniform characteristics, but less research has addressed the calculation of slurry water hammer pressure in complex pipelines with slurry flows carrying solid particles. In this paper, based on the developments of slurry pipelines at home and abroad, the fundamental principle and method of numerical simulation of transient processes are presented, and several boundary conditions are given. Through the numerical simulation and analysis of transient processes of a practical engineering of long-distance slurry transportation pipeline system, effective protection measures and operating suggestions are presented. A model for calculating the water impact of solid and fluid phases is established based on a practical engineering of long-distance slurry pipeline transportation system. After performing a numerical simulation of the transient process, analyzing and comparing the results, effective protection measures and operating advice are recommended, which has guiding significance to the design and operating management of practical engineering of longdistance slurry pipeline transportation system.

  10. Pipeline oil fire detection with MODIS active fire products

    NASA Astrophysics Data System (ADS)

    Ogungbuyi, M. G.; Martinez, P.; Eckardt, F. D.

    2017-12-01

    We investigate 85 129 MODIS satellite active fire events from 2007 to 2015 in the Niger Delta of Nigeria. The region is the oil base for Nigerian economy and the hub of oil exploration where oil facilities (i.e. flowlines, flow stations, trunklines, oil wells and oil fields) are domiciled, and from where crude oil and refined products are transported to different Nigerian locations through a network of pipeline systems. Pipeline and other oil facilities are consistently susceptible to oil leaks due to operational or maintenance error, and by acts of deliberate sabotage of the pipeline equipment which often result in explosions and fire outbreaks. We used ground oil spill reports obtained from the National Oil Spill Detection and Response Agency (NOSDRA) database (see www.oilspillmonitor.ng) to validate MODIS satellite data. NOSDRA database shows an estimate of 10 000 spill events from 2007 - 2015. The spill events were filtered to include largest spills by volume and events occurring only in the Niger Delta (i.e. 386 spills). By projecting both MODIS fire and spill as `input vector' layers with `Points' geometry, and the Nigerian pipeline networks as `from vector' layers with `LineString' geometry in a geographical information system, we extracted the nearest MODIS events (i.e. 2192) closed to the pipelines by 1000m distance in spatial vector analysis. The extraction process that defined the nearest distance to the pipelines is based on the global practices of the Right of Way (ROW) in pipeline management that earmarked 30m strip of land to the pipeline. The KML files of the extracted fires in a Google map validated their source origin to be from oil facilities. Land cover mapping confirmed fire anomalies. The aim of the study is to propose a near-real-time monitoring of spill events along pipeline routes using 250 m spatial resolution of MODIS active fire detection sensor when such spills are accompanied by fire events in the study location.

  11. Deep ocean corrosion research in support of Oman India gas pipeline

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Graham, F.W.; McKeehan, D.S.

    1995-12-01

    The increasing interest in deepwater exploration and production has motivated the development of technologies required to accomplish tasks heretofore possible only onshore and in shallow water. The tremendous expense of technology development and the cost of specialized equipment has created concerns that the design life of these facilities may be compromised by corrosion. The requirements to develop and prove design parameters to meet these demands will require an ongoing environmental testing and materials evaluation and development program. This paper describes a two-fold corrosion testing program involving: (1) the installation of two corrosion test devices installed in-situ, and (2) a laboratorymore » test conducted in simulated site-specific seawater. These tests are expected to qualify key parameters necessary to design a cathodic protection system to protect the Oman-to-India pipeline.« less

  12. 40 CFR 761.60 - Disposal requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a disposal facility approved under this part. (5) Natural gas pipeline systems containing PCBs. The owner or operator of natural gas pipeline systems containing ≥50 ppm PCBs, when no longer in use, shall... the PCB concentrations in natural gas pipeline systems shall do so in accordance with paragraph (b)(5...

  13. 76 FR 80553 - Mandatory Reporting of Greenhouse Gases: Technical Revisions to the Petroleum and Natural Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... facilities 486210 Pipeline transportation of natural gas. Petroleum and Natural Gas Systems. 221210 Natural... and Budget PHMSA Pipeline and Hazardous Material Safety Administration QA/QC quality assurance/quality... distribution pipelines, but also into liquefied natural gas storage or into underground storage. We are...

  14. 49 CFR 191.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE... summary data by operators of gas pipeline facilities located in the United States or Puerto Rico... Continental Shelf Lands Act (43 U.S.C. 1331). (b) This part does not apply to— (1) Offshore gathering of gas...

  15. 30 CFR 250.154 - What identification signs must I display?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... number of the facility location as depicted on OCS Official Protraction Diagrams or leasing maps; (iii...; and (3) For subsea wells that flow individually into separate pipelines, affix the required sign on... receiving platform. For multiple subsea wells that flow into a common pipeline or pipelines, no sign is...

  16. 30 CFR 250.154 - What identification signs must I display?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... number of the facility location as depicted on OCS Official Protraction Diagrams or leasing maps; (iii...; and (3) For subsea wells that flow individually into separate pipelines, affix the required sign on... receiving platform. For multiple subsea wells that flow into a common pipeline or pipelines, no sign is...

  17. 30 CFR 250.154 - What identification signs must I display?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... number of the facility location as depicted on OCS Official Protraction Diagrams or leasing maps; (iii...; and (3) For subsea wells that flow individually into separate pipelines, affix the required sign on... receiving platform. For multiple subsea wells that flow into a common pipeline or pipelines, no sign is...

  18. 30 CFR 250.154 - What identification signs must I display?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... number of the facility location as depicted on OCS Official Protraction Diagrams or leasing maps; (iii...; and (3) For subsea wells that flow individually into separate pipelines, affix the required sign on... receiving platform. For multiple subsea wells that flow into a common pipeline or pipelines, no sign is...

  19. 30 CFR 250.1001 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Way § 250.1001 Definitions. Terms used in this subpart shall have the meanings given below: DOI... connecting production facilities on the OCS; (4) Transporter-operated pipelines that DOI and DOT have agreed are to be regulated as DOI pipelines; and (5) All OCS pipelines not subject to regulation under 49 CFR...

  20. 18 CFR 260.9 - Reports by natural gas pipeline companies on service interruptions and damage to facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Reports by natural gas..., NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.9 Reports by natural gas pipeline companies on service interruptions and damage to facilities. (a)(1) Every natural gas company must report to the...

  1. 76 FR 77583 - Vantage Pipeline US LP; Notice of Intent To Prepare an Environmental Assessment and Request for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... facilities of natural gas liquids to be located at the international border of the United States and Canada...) entitled ``An Interstate Natural Gas Facility On My Land? What Do I Need To Know?'' is available for your... Vantage Pipeline Project would serve the national interest by providing the natural gas, oil, and ethane...

  2. Using simulated fluorescence cell micrographs for the evaluation of cell image segmentation algorithms.

    PubMed

    Wiesmann, Veit; Bergler, Matthias; Palmisano, Ralf; Prinzen, Martin; Franz, Daniela; Wittenberg, Thomas

    2017-03-18

    Manual assessment and evaluation of fluorescent micrograph cell experiments is time-consuming and tedious. Automated segmentation pipelines can ensure efficient and reproducible evaluation and analysis with constant high quality for all images of an experiment. Such cell segmentation approaches are usually validated and rated in comparison to manually annotated micrographs. Nevertheless, manual annotations are prone to errors and display inter- and intra-observer variability which influence the validation results of automated cell segmentation pipelines. We present a new approach to simulate fluorescent cell micrographs that provides an objective ground truth for the validation of cell segmentation methods. The cell simulation was evaluated twofold: (1) An expert observer study shows that the proposed approach generates realistic fluorescent cell micrograph simulations. (2) An automated segmentation pipeline on the simulated fluorescent cell micrographs reproduces segmentation performances of that pipeline on real fluorescent cell micrographs. The proposed simulation approach produces realistic fluorescent cell micrographs with corresponding ground truth. The simulated data is suited to evaluate image segmentation pipelines more efficiently and reproducibly than it is possible on manually annotated real micrographs.

  3. 75 FR 39926 - Deer Creek Station Energy Facility Project (DOE/EIS-0415)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... County, South Dakota, approximately 13.2 miles of new natural gas supply pipeline, a 0.75- mile.... To provide natural gas, a 10-mile natural gas pipeline would be constructed from the site to access..., and groundwater. Crossings of streams and wetlands by gas pipelines and waterlines have been minimized...

  4. 78 FR 17189 - Trunkline LNG Export, LLC; Application for Long-Term Authorization to Export Liquefied Natural...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... that would permit gas to be received by pipeline at the terminal and liquefied for subsequent export... the natural gas proposed for export will come from the United States natural gas pipeline system... authorization to construct additional pipeline facilities necessary to provide feed gas to the proposed...

  5. 30 CFR 250.1004 - Safety equipment requirements for DOI pipelines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... delivering gas to the power plant platform may be equipped with high- and low-pressure sensors (PSHL), which... facilities shall be protected by high- and low-pressure sensors (PSHL) to directly or indirectly shut in all... pressure range. However, high pilots shall not be set above the pipeline's MAOP. (4) Crossing pipelines on...

  6. 30 CFR 250.1004 - Safety equipment requirements for DOI pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... delivering gas to the power plant platform may be equipped with high- and low-pressure sensors (PSHL), which... facilities shall be protected by high- and low-pressure sensors (PSHL) to directly or indirectly shut in all... pressure range. However, high pilots shall not be set above the pipeline's MAOP. (4) Crossing pipelines on...

  7. 30 CFR 250.1004 - Safety equipment requirements for DOI pipelines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... delivering gas to the power plant platform may be equipped with high- and low-pressure sensors (PSHL), which... facilities shall be protected by high- and low-pressure sensors (PSHL) to directly or indirectly shut in all... pressure range. However, high pilots shall not be set above the pipeline's MAOP. (4) Crossing pipelines on...

  8. 78 FR 53749 - Gulf South Pipeline Company, LP, Petal Gas Storage, LLC; Notice of Availability of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... (Moss Point Compressor Station); A new meter and regulator station and pig\\1\\ launcher/ receiver... Transmission Company, LLC's existing pipeline; and \\1\\ A ``pig'' is a tool that is inserted into and moves.... Associated appurtenant aboveground facilities along the proposed pipeline including mainline valves, pig...

  9. INTERIOR OF BUILDING, SHOWING PIPELINES. view TO NORTH Plattsburgh ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR OF BUILDING, SHOWING PIPELINES. view TO NORTH - Plattsburgh Air Force Base, Industrial Wastewater Treatment & Disposal Facility, Off LeMay Road, outside SAC Alert Area, Plattsburgh, Clinton County, NY

  10. Risk Analysis using Corrosion Rate Parameter on Gas Transmission Pipeline

    NASA Astrophysics Data System (ADS)

    Sasikirono, B.; Kim, S. J.; Haryadi, G. D.; Huda, A.

    2017-05-01

    In the oil and gas industry, the pipeline is a major component in the transmission and distribution process of oil and gas. Oil and gas distribution process sometimes performed past the pipeline across the various types of environmental conditions. Therefore, in the transmission and distribution process of oil and gas, a pipeline should operate safely so that it does not harm the surrounding environment. Corrosion is still a major cause of failure in some components of the equipment in a production facility. In pipeline systems, corrosion can cause failures in the wall and damage to the pipeline. Therefore it takes care and periodic inspections or checks on the pipeline system. Every production facility in an industry has a level of risk for damage which is a result of the opportunities and consequences of damage caused. The purpose of this research is to analyze the level of risk of 20-inch Natural Gas Transmission Pipeline using Risk-based inspection semi-quantitative based on API 581 associated with the likelihood of failure and the consequences of the failure of a component of the equipment. Then the result is used to determine the next inspection plans. Nine pipeline components were observed, such as a straight pipes inlet, connection tee, and straight pipes outlet. The risk assessment level of the nine pipeline’s components is presented in a risk matrix. The risk level of components is examined at medium risk levels. The failure mechanism that is used in this research is the mechanism of thinning. Based on the results of corrosion rate calculation, remaining pipeline components age can be obtained, so the remaining lifetime of pipeline components are known. The calculation of remaining lifetime obtained and the results vary for each component. Next step is planning the inspection of pipeline components by NDT external methods.

  11. 40 CFR 63.11095 - What are my reporting requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Notifications, Records, and Reports § 63...) Each owner or operator of a bulk gasoline plant or a pipeline pumping station shall submit a semiannual...

  12. 30 CFR 250.1700 - What do the terms “decommissioning”, “obstructions”, and “facility” mean?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... assemblies, umbilicals, manifolds, termination skids, production and pipeline risers, platforms, templates... on the OCS. Facilities include production and pipeline risers, templates, pilings, and any other...

  13. 18 CFR 284.302 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... pipeline means an interstate natural gas pipeline that holds a certificate under section 7 of the NGA... facilities that fall within the scope of the Commission's jurisdiction under section 7 of the NGA to the full...

  14. 18 CFR 284.302 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... pipeline means an interstate natural gas pipeline that holds a certificate under section 7 of the NGA... facilities that fall within the scope of the Commission's jurisdiction under section 7 of the NGA to the full...

  15. 18 CFR 284.302 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... pipeline means an interstate natural gas pipeline that holds a certificate under section 7 of the NGA... facilities that fall within the scope of the Commission's jurisdiction under section 7 of the NGA to the full...

  16. 18 CFR 284.302 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... pipeline means an interstate natural gas pipeline that holds a certificate under section 7 of the NGA... facilities that fall within the scope of the Commission's jurisdiction under section 7 of the NGA to the full...

  17. 18 CFR 284.302 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... pipeline means an interstate natural gas pipeline that holds a certificate under section 7 of the NGA... facilities that fall within the scope of the Commission's jurisdiction under section 7 of the NGA to the full...

  18. 49 CFR 193.2627 - Atmospheric corrosion control.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 193.2627 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2627 Atmospheric corrosion...

  19. 49 CFR 193.2635 - Monitoring corrosion control.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....2635 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2635 Monitoring corrosion control...

  20. East Spar: Alliance approach for offshore gasfield development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-04-01

    East spar is a gas/condensate field 25 miles west of Barrow Island, offshore Western Australia. Proved plus probable reserves at the time of development were estimated at 430 Bcf gas and 28 million bbl of condensate. The field was discovered in early 1993 when the Western Australia gas market was deregulated and the concept of a gas pipeline to the gold fields was proposed. This created a window of opportunity for East Spar, but only if plans could be established quickly. A base-case development plan was established to support gas marketing while alternative plans could be developed in parallel. Themore » completed East Spar facilities comprise two subsea wells, a subsea gathering system, and a multiphase (gas/condensate/water) pipeline to new gas-processing facilities. The subsea facilities are controlled through a navigation, communication, and control (NCC) buoy. The control room and gas-processing plant are 39 miles east of the field on Varanus Island. Sales gas is exported through a pre-existing gas-sales pipeline to the Dampier-Bunbury and Goldfields Gas Transmission pipelines. Condensate is stored in and exported by use of pre-existing facilities on Varanus Island. Field development from approval to first production took 22 months. The paper describes its field development.« less

  1. 76 FR 1659 - Notice of Receipt of Application for a Presidential Permit To Construct, Operate and Maintain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... maintain pipeline facilities on the border of the United States from Vantage Pipeline US LP (``Applicant'' or ``Vantage''), a limited partnership duly organized under the laws of the State of Delaware. According to the application, Vantage's general partner is Vantage Pipeline US GP LLC, a Delaware limited...

  2. 78 FR 50087 - Notice of Intent To Prepare a Supplemental Environmental Impact Statement for the Alpine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... the majority of the infield road and pipeline route. CPAI proposes placement of fill material on 73.1..., gas, and water produced from the reservoir would be carried via pipeline to CD-1 for processing. Sales... construct, operate, and maintain a drill site, access road, pipelines, and ancillary facilities to support...

  3. 78 FR 66355 - Pleasant Grove City, UT; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-05

    ... intake pipe off the existing 12-inch diameter water supply pipeline; (2) a new powerhouse containing one... water into an existing 12-inch water supply pipeline; and (4) appurtenant facilities. The proposed...--Project Blue Energy would utilize Pleasant Grove's water intake pipeline that delivers water to its water...

  4. 78 FR 144 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ... integrated pipeline system which connects producers and shippers of crude oil and natural gas liquids in....enbridgepartners.com ). Enbridge Partners provides pipeline transportation of petroleum and natural gas in the mid... or importation of liquid petroleum, petroleum products, or other non-gaseous fuels to or from a...

  5. 49 CFR 195.575 - Which facilities must I electrically isolate and what inspections, tests, and safeguards are...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reasonable to foresee fault currents or an unusual risk of lightning, you must protect the pipeline against... metallic structures, unless you electrically interconnect and cathodically protect the pipeline and the... isolation of a portion of a pipeline is necessary to facilitate the application of corrosion control. (c...

  6. 49 CFR 195.575 - Which facilities must I electrically isolate and what inspections, tests, and safeguards are...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... reasonable to foresee fault currents or an unusual risk of lightning, you must protect the pipeline against... metallic structures, unless you electrically interconnect and cathodically protect the pipeline and the... isolation of a portion of a pipeline is necessary to facilitate the application of corrosion control. (c...

  7. 49 CFR 195.575 - Which facilities must I electrically isolate and what inspections, tests, and safeguards are...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... reasonable to foresee fault currents or an unusual risk of lightning, you must protect the pipeline against... metallic structures, unless you electrically interconnect and cathodically protect the pipeline and the... isolation of a portion of a pipeline is necessary to facilitate the application of corrosion control. (c...

  8. Interactive 3D visualization speeds well, reservoir planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petzet, G.A.

    1997-11-24

    Texaco Exploration and Production has begun making expeditious analyses and drilling decisions that result from interactive, large screen visualization of seismic and other three dimensional data. A pumpkin shaped room or pod inside a 3,500 sq ft, state-of-the-art facility in Southwest Houston houses a supercomputer and projection equipment Texaco said will help its people sharply reduce 3D seismic project cycle time, boost production from existing fields, and find more reserves. Oil and gas related applications of the visualization center include reservoir engineering, plant walkthrough simulation for facilities/piping design, and new field exploration. The center houses a Silicon Graphics Onyx2 infinitemore » reality supercomputer configured with 8 processors, 3 graphics pipelines, and 6 gigabytes of main memory.« less

  9. 49 CFR 193.2605 - Maintenance procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2605 Maintenance procedures. (a) Each operator shall determine...

  10. 49 CFR 193.2605 - Maintenance procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2605 Maintenance procedures. (a) Each operator shall determine...

  11. 30 CFR 250.1700 - What do the terms “decommissioning”, “obstructions”, and “facility” mean?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... trees, jumper assemblies, umbilicals, manifolds, termination skids, production and pipeline risers... attached to the seabed on the OCS. Facilities include production and pipeline risers, templates, pilings...

  12. 30 CFR 250.1700 - What do the terms “decommissioning”, “obstructions”, and “facility” mean?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... trees, jumper assemblies, umbilicals, manifolds, termination skids, production and pipeline risers... attached to the seabed on the OCS. Facilities include production and pipeline risers, templates, pilings...

  13. 30 CFR 250.1700 - What do the terms “decommissioning”, “obstructions”, and “facility” mean?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... trees, jumper assemblies, umbilicals, manifolds, termination skids, production and pipeline risers... attached to the seabed on the OCS. Facilities include production and pipeline risers, templates, pilings...

  14. PICARD - A PIpeline for Combining and Analyzing Reduced Data

    NASA Astrophysics Data System (ADS)

    Gibb, Andrew G.; Jenness, Tim; Economou, Frossie

    PICARD is a facility for combining and analyzing reduced data, normally the output from the ORAC-DR data reduction pipeline. This document describes an introduction to using PICARD for processing instrument-independent data.

  15. 49 CFR 193.2304 - Corrosion control overview.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....2304 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Construction § 193.2304 Corrosion control overview. (a...

  16. 49 CFR 193.2305-193.2319 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....2319 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Construction §§ 193.2305-193.2319 [Reserved] ...

  17. 49 CFR 193.2631 - Internal corrosion control.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....2631 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2631 Internal corrosion control. Each...

  18. 49 CFR 193.2009 - Rules of regulatory construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 193.2009 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS General § 193.2009 Rules of regulatory...

  19. 49 CFR 193.2323-193.2329 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....2329 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Construction §§ 193.2323-193.2329 [Reserved] ...

  20. 49 CFR 193.2515 - Investigations of failures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....2515 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Operations § 193.2515 Investigations of failures. (a) Each...

  1. 76 FR 10348 - Northwest Pipeline, GP; Notice of Intent To Prepare an Environmental Assessment for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... approximately 15 miles of 16-inch- diameter pipeline; Relocate an existing pig \\1\\ receiver from MP 41.02 to MP 48.04 and remove aboveground facilities, including a pig launcher, piping, and valves, to accommodate... ``pig'' is a tool that is inserted into and moves through the pipeline, and is used for cleaning the...

  2. PISCES High Contrast Integral Field Spectrograph Simulations and Data Reduction Pipeline

    NASA Technical Reports Server (NTRS)

    Llop Sayson, Jorge Domingo; Memarsadeghi, Nargess; McElwain, Michael W.; Gong, Qian; Perrin, Marshall; Brandt, Timothy; Grammer, Bryan; Greeley, Bradford; Hilton, George; Marx, Catherine

    2015-01-01

    The PISCES (Prototype Imaging Spectrograph for Coronagraphic Exoplanet Studies) is a lenslet array based integral field spectrograph (IFS) designed to advance the technology readiness of the WFIRST (Wide Field Infrared Survey Telescope)-AFTA (Astrophysics Focused Telescope Assets) high contrast Coronagraph Instrument. We present the end to end optical simulator and plans for the data reduction pipeline (DRP). The optical simulator was created with a combination of the IDL (Interactive Data Language)-based PROPER (optical propagation) library and Zemax (a MatLab script), while the data reduction pipeline is a modified version of the Gemini Planet Imager's (GPI) IDL pipeline. The simulations of the propagation of light through the instrument are based on Fourier transform algorithms. The DRP enables transformation of the PISCES IFS data to calibrated spectral data cubes.

  3. 75 FR 24943 - Millennium Pipeline Company, LLC; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... at a tie-in at Chambers Road near Horseheads, New York to an interconnection with the facilities of... to Gary A. Kruse, Vice President--General Counsel and Secretary, Millennium Pipeline Company, LLC...

  4. 49 CFR 193.2003 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false [Reserved] 193.2003 Section 193.2003 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  5. 49 CFR 193.2617 - Repairs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Repairs. 193.2617 Section 193.2617 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  6. 49 CFR 193.2015 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false [Reserved] 193.2015 Section 193.2015 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  7. 49 CFR 193.2517 - Purging.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Purging. 193.2517 Section 193.2517 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  8. 49 CFR 193.2401 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Scope. 193.2401 Section 193.2401 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  9. 49 CFR 193.2603 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false General. 193.2603 Section 193.2603 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  10. 49 CFR 193.2623 - Inspecting LNG storage tanks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....2623 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2623 Inspecting LNG storage tanks. Each LNG...

  11. 49 CFR 193.2505 - Cooldown.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Cooldown. 193.2505 Section 193.2505 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  12. 49 CFR 193.2501 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Scope. 193.2501 Section 193.2501 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  13. 49 CFR 193.2301 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Scope. 193.2301 Section 193.2301 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  14. 49 CFR 193.2601 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Scope. 193.2601 Section 193.2601 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  15. 49 CFR 193.2011 - Reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Reporting. 193.2011 Section 193.2011 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  16. 49 CFR 193.2507 - Monitoring operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... watching or listening from an attended control center for warning alarms, such as gas, temperature...

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, E.A.; Smed, P.F.; Bryndum, M.B.

    The paper describes the numerical program, PIPESIN, that simulates the behavior of a pipeline placed on an erodible seabed. PIPEline Seabed INteraction from installation until a stable pipeline seabed configuration has occurred is simulated in the time domain including all important physical processes. The program is the result of the joint research project, ``Free Span Development and Self-lowering of Offshore Pipelines`` sponsored by EU and a group of companies and carried out by the Danish Hydraulic Institute and Delft Hydraulics. The basic modules of PIPESIN are described. The description of the scouring processes has been based on and verified throughmore » physical model tests carried out as part of the research project. The program simulates a section of the pipeline (typically 500 m) in the time domain, the main input being time series of the waves and current. The main results include predictions of the onset of free spans, their length distribution, their variation in time, and the lowering of the pipeline as function of time.« less

  18. Jet-mixing of initially-stratified liquid-liquid pipe flows: experiments and numerical simulations

    NASA Astrophysics Data System (ADS)

    Wright, Stuart; Ibarra-Hernandes, Roberto; Xie, Zhihua; Markides, Christos; Matar, Omar

    2016-11-01

    Low pipeline velocities lead to stratification and so-called 'phase slip' in horizontal liquid-liquid flows due to differences in liquid densities and viscosities. Stratified flows have no suitable single point for sampling, from which average phase properties (e.g. fractions) can be established. Inline mixing, achieved by static mixers or jets in cross-flow (JICF), is often used to overcome liquid-liquid stratification by establishing unstable two-phase dispersions for sampling. Achieving dispersions in liquid-liquid pipeline flows using JICF is the subject of this experimental and modelling work. The experimental facility involves a matched refractive index liquid-liquid-solid system, featuring an ETFE test section, and experimental liquids which are silicone oil and a 51-wt% glycerol solution. The matching then allows the dispersed fluid phase fractions and velocity fields to be established through advanced optical techniques, namely PLIF (for phase) and PTV or PIV (for velocity fields). CFD codes using the volume of a fluid (VOF) method are then used to demonstrate JICF breakup and dispersion in stratified pipeline flows. A number of simple jet configurations are described and their dispersion effectiveness is compared with the experimental results. Funding from Cameron for Ph.D. studentship (SW) gratefully acknowledged.

  19. A new segmentation strategy for processing magnetic anomaly detection data of shallow depth ferromagnetic pipeline

    NASA Astrophysics Data System (ADS)

    Feng, Shuo; Liu, Dejun; Cheng, Xing; Fang, Huafeng; Li, Caifang

    2017-04-01

    Magnetic anomalies produced by underground ferromagnetic pipelines because of the polarization of earth's magnetic field are used to obtain the information on the location, buried depth and other parameters of pipelines. In order to achieve a fast inversion and interpretation of measured data, it is necessary to develop a fast and stable forward method. Magnetic dipole reconstruction (MDR), as a kind of integration numerical method, is well suited for simulating a thin pipeline anomaly. In MDR the pipeline model must be cut into small magnetic dipoles through different segmentation methods. The segmentation method has an impact on the stability and speed of forward calculation. Rapid and accurate simulation of deep-buried pipelines has been achieved by exciting segmentation method. However, in practical measurement, the depth of underground pipe is uncertain. When it comes to the shallow-buried pipeline, the present segmentation may generate significant errors. This paper aims at solving this problem in three stages. First, the cause of inaccuracy is analyzed by simulation experiment. Secondly, new variable interval section segmentation is proposed based on the existing segmentation. It can help MDR method to obtain simulation results in a fast way under the premise of ensuring the accuracy of different depth models. Finally, the measured data is inversed based on new segmentation method. The result proves that the inversion based on the new segmentation can achieve fast and accurate inversion of depth parameters of underground pipes without being limited by pipeline depth.

  20. Alaska oil pipeline in retrospect

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klein, D.R.

    Caribou have not adjusted as well as moose to the presence of the trans-Alaska pipeline. Research has shown that caribou have altered their movements and patterns and range use in relation to the pipeline corridor. Cows with calves show pronounced avoidance of the pipeline, road, and oil field. Traffic and human activity appear more directly responsible for avoidance behavior than does that physical presence of the pipeline, road, and facilities. Animals along the haul road are especially vulnerable to poaching because of the open terrain and the fact that many become tame during the peak of construction activity. Poaching, especiallymore » of furbearers, has increased as pipeline-related traffic has decreased.« less

  1. Investigation of CO2 release pressures in pipeline cracks

    NASA Astrophysics Data System (ADS)

    Gorenz, Paul; Herzog, Nicoleta; Egbers, Christoph

    2013-04-01

    The CCS (Carbon Capture and Storage) technology can prevent or reduce the emissions of carbon dioxide. The main idea of this technology is the segregation and collection of CO2 from facilities with a high emission of that greenhouse gas, i.e. power plants which burn fossil fuels. To segregate CO2 from the exhaust gas the power plant must be upgraded. Up to now there are three possible procedures to segregate the carbon dioxide with different advantages and disadvantages. After segregation the carbon dioxide will be transported by pipeline to a subsurface storage location. As CO2 is at normal conditions (1013,25 Pa; 20 °C) in a gaseous phase state it must be set under high pressure to enter denser phase states to make a more efficient pipeline transport possible. Normally the carbon dioxide is set into the liquid or supercritical phase state by compressor stations which compress the gas up to 15 MPa. The pressure drop makes booster stations along the pipeline necessary which keep the CO2 in a dens phase state. Depending on the compression pressure CO2 can be transported over 300km without any booster station. The goal of this work is the investigation of release pressures in pipeline cracks. The high pressurised pipeline system consists of different parts with different failure probabilities. In most cases corrosion or obsolescence is the reason for pipeline damages. In case of a crack CO2 will escape from the pipeline and disperse into the atmosphere. Due to its nature CO2 can remain unattended for a long time. There are some studies of the CO2 dispersion process, e.g. Mazzoldi et al. (2007, 2008 and 2011) and Wang et al. (2008), but with different assumptions concerning the pipeline release pressures. To give an idea of realistic release pressures investigations with the CFD tool OpenFOAM were carried out and are presented within this work. To cover such a scenario with an accidental release of carbon dioxide a pipeline section with different diameters and leakage release holes were modelled. This pipeline section is 10m long with the leakage hole in the middle. Additionally a small environment subdomain is simulated around the crack. For computation a multiphase solver was utilised. In a first step incompressible and isothermal fluids with no phase change were assumed.

  2. 78 FR 63560 - Notice of Receipt of an Application by Magellan Pipeline Company, L.P., for Issuance of a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... facilities permitted under a 1995 Presidential Permit issued to Chevron Pipeline Company (``Chevron... Paso, Texas to the U.S. boundary with Mexico. Through corporate transactions, Chevron assigned the...

  3. 49 CFR 193.2321 - Nondestructive tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Nondestructive tests. 193.2321 Section 193.2321 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  4. 49 CFR 193.2511 - Personnel safety.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... or a means of escape. (c) Each LNG plant must be equipped with suitable first-aid material, the...

  5. 49 CFR 193.2509 - Emergency procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Emergency procedures. 193.2509 Section 193.2509 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  6. 49 CFR 193.2633 - Interference currents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Interference currents. 193.2633 Section 193.2633 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  7. 49 CFR 193.2303 - Construction acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Construction acceptance. 193.2303 Section 193.2303 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  8. 49 CFR 193.2503 - Operating procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... pressure so that the resultant gas is within limits established for the vaporizer and the downstream piping...

  9. 49 CFR 193.2609 - Support systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Support systems. 193.2609 Section 193.2609 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  10. 49 CFR 193.2611 - Fire protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Fire protection. 193.2611 Section 193.2611 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  11. 49 CFR 193.2521 - Operating records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Operating records. 193.2521 Section 193.2521 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  12. 49 CFR 193.2637 - Remedial measures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Remedial measures. 193.2637 Section 193.2637 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  13. 49 CFR 193.2625 - Corrosion protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Corrosion protection. 193.2625 Section 193.2625 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  14. 49 CFR 193.2607 - Foreign material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Foreign material. 193.2607 Section 193.2607 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  15. 49 CFR 193.2605 - Maintenance procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Maintenance procedures. 193.2605 Section 193.2605 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  16. 49 CFR 193.2519 - Communication systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Communication systems. 193.2519 Section 193.2519 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  17. DoD Fuel Facilities Criteria

    DTIC Science & Technology

    2015-04-27

    Pantograph Feb-2010 UFGS 33 58 00 Leak Detection for Fueling Systems Apr-2008 UFGS 33 52 43.13 Aviation Fuel Piping Feb-2010 UFGS 33 59 00 Tightness of... Pipeline Pressure Testing Guidelines  Specifications  Questions 2 7/12/2017 3 7/12/2017 DoD Fuels Facilities Documents  Unified...UFGS)  Most in the 33 nn nn series  Associated with Standard Designs  Available on WBDG site  Coating Systems 4 7/12/2017 Pipeline

  18. Nearshore Pipeline Installation Methods.

    DTIC Science & Technology

    1981-08-01

    inches b) Pipe, materials of construction: fully rigid, semi-rigid, flexible c) Pipeline length, maximum 2 miles d) Pipeline design life , minimum 15...common to their operations. Permanent facilities are specified in the Statement of Work. There- fore, a minimum design life of 15 years is chosen, which...makes the pipe leakproof and resists corrosion and abrasion. 5) Interlocked Z-shaped steel or stainless steel carcass - resists internal and external

  19. Mathematical simulation for compensation capacities area of pipeline routes in ship systems

    NASA Astrophysics Data System (ADS)

    Ngo, G. V.; Sakhno, K. N.

    2018-05-01

    In this paper, the authors considered the problem of manufacturability’s enhancement of ship systems pipeline at the designing stage. The analysis of arrangements and possibilities for compensation of deviations for pipeline routes has been carried out. The task was set to produce the “fit pipe” together with the rest of the pipes in the route. It was proposed to compensate for deviations by movement of the pipeline route during pipe installation and to calculate maximum values of these displacements in the analyzed path. Theoretical bases of deviation compensation for pipeline routes using rotations of parallel section pairs of pipes are assembled. Mathematical and graphical simulations of compensation area capacities of pipeline routes with various configurations are completed. Prerequisites have been created for creating an automated program that will allow one to determine values of the compensatory capacities area for pipeline routes and to assign quantities of necessary allowances.

  20. CFD analysis of onshore oil pipelines in permafrost

    NASA Astrophysics Data System (ADS)

    Nardecchia, Fabio; Gugliermetti, Luca; Gugliermetti, Franco

    2017-07-01

    Underground pipelines are built all over the world and the knowledge of their thermal interaction with the soil is crucial for their design. This paper studies the "thermal influenced zone" produced by a buried pipeline and the parameters that can influence its extension by 2D-steady state CFD simulations with the aim to improve the design of new pipelines in permafrost. In order to represent a real case, the study is referred to the Eastern Siberia-Pacific Ocean Oil Pipeline at the three stations of Mo'he, Jiagedaqi and Qiqi'har. Different burial depth sand diameters of the pipe are analyzed; the simulation results show that the effect of the oil pipeline diameter on the thermal field increases with the increase of the distance from the starting station.

  1. Analysis of oil-pipeline distribution of multiple products subject to delivery time-windows

    NASA Astrophysics Data System (ADS)

    Jittamai, Phongchai

    This dissertation defines the operational problems of, and develops solution methodologies for, a distribution of multiple products into oil pipeline subject to delivery time-windows constraints. A multiple-product oil pipeline is a pipeline system composing of pipes, pumps, valves and storage facilities used to transport different types of liquids. Typically, products delivered by pipelines are petroleum of different grades moving either from production facilities to refineries or from refineries to distributors. Time-windows, which are generally used in logistics and scheduling areas, are incorporated in this study. The distribution of multiple products into oil pipeline subject to delivery time-windows is modeled as multicommodity network flow structure and mathematically formulated. The main focus of this dissertation is the investigation of operating issues and problem complexity of single-source pipeline problems and also providing solution methodology to compute input schedule that yields minimum total time violation from due delivery time-windows. The problem is proved to be NP-complete. The heuristic approach, a reversed-flow algorithm, is developed based on pipeline flow reversibility to compute input schedule for the pipeline problem. This algorithm is implemented in no longer than O(T·E) time. This dissertation also extends the study to examine some operating attributes and problem complexity of multiple-source pipelines. The multiple-source pipeline problem is also NP-complete. A heuristic algorithm modified from the one used in single-source pipeline problems is introduced. This algorithm can also be implemented in no longer than O(T·E) time. Computational results are presented for both methodologies on randomly generated problem sets. The computational experience indicates that reversed-flow algorithms provide good solutions in comparison with the optimal solutions. Only 25% of the problems tested were more than 30% greater than optimal values and approximately 40% of the tested problems were solved optimally by the algorithms.

  2. A Proposed Scalable Design and Simulation of Wireless Sensor Network-Based Long-Distance Water Pipeline Leakage Monitoring System

    PubMed Central

    Almazyad, Abdulaziz S.; Seddiq, Yasser M.; Alotaibi, Ahmed M.; Al-Nasheri, Ahmed Y.; BenSaleh, Mohammed S.; Obeid, Abdulfattah M.; Qasim, Syed Manzoor

    2014-01-01

    Anomalies such as leakage and bursts in water pipelines have severe consequences for the environment and the economy. To ensure the reliability of water pipelines, they must be monitored effectively. Wireless Sensor Networks (WSNs) have emerged as an effective technology for monitoring critical infrastructure such as water, oil and gas pipelines. In this paper, we present a scalable design and simulation of a water pipeline leakage monitoring system using Radio Frequency IDentification (RFID) and WSN technology. The proposed design targets long-distance aboveground water pipelines that have special considerations for maintenance, energy consumption and cost. The design is based on deploying a group of mobile wireless sensor nodes inside the pipeline and allowing them to work cooperatively according to a prescheduled order. Under this mechanism, only one node is active at a time, while the other nodes are sleeping. The node whose turn is next wakes up according to one of three wakeup techniques: location-based, time-based and interrupt-driven. In this paper, mathematical models are derived for each technique to estimate the corresponding energy consumption and memory size requirements. The proposed equations are analyzed and the results are validated using simulation. PMID:24561404

  3. A proposed scalable design and simulation of wireless sensor network-based long-distance water pipeline leakage monitoring system.

    PubMed

    Almazyad, Abdulaziz S; Seddiq, Yasser M; Alotaibi, Ahmed M; Al-Nasheri, Ahmed Y; BenSaleh, Mohammed S; Obeid, Abdulfattah M; Qasim, Syed Manzoor

    2014-02-20

    Anomalies such as leakage and bursts in water pipelines have severe consequences for the environment and the economy. To ensure the reliability of water pipelines, they must be monitored effectively. Wireless Sensor Networks (WSNs) have emerged as an effective technology for monitoring critical infrastructure such as water, oil and gas pipelines. In this paper, we present a scalable design and simulation of a water pipeline leakage monitoring system using Radio Frequency IDentification (RFID) and WSN technology. The proposed design targets long-distance aboveground water pipelines that have special considerations for maintenance, energy consumption and cost. The design is based on deploying a group of mobile wireless sensor nodes inside the pipeline and allowing them to work cooperatively according to a prescheduled order. Under this mechanism, only one node is active at a time, while the other nodes are sleeping. The node whose turn is next wakes up according to one of three wakeup techniques: location-based, time-based and interrupt-driven. In this paper, mathematical models are derived for each technique to estimate the corresponding energy consumption and memory size requirements. The proposed equations are analyzed and the results are validated using simulation.

  4. 49 CFR 193.2321 - Nondestructive tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Nondestructive tests. 193.2321 Section 193.2321 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  5. 49 CFR 193.2321 - Nondestructive tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Nondestructive tests. 193.2321 Section 193.2321 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  6. 30 CFR 253.10 - What facilities does this part cover?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... granted under the OCSLA or applicable state law. (b) For a pipeline COF that extends onto land, this part applies to that portion of the pipeline lying seaward of the first accessible flow shut-off device on land. ...

  7. 49 CFR 193.2615 - Isolating and purging.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Isolating and purging. 193.2615 Section 193.2615 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  8. 49 CFR 193.2613 - Auxiliary power sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Auxiliary power sources. 193.2613 Section 193.2613 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  9. 49 CFR 193.2621 - Testing transfer hoses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Testing transfer hoses. 193.2621 Section 193.2621 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  10. Environmental Assessment of the Prather Water Line Improvement Project Otero County, New Mexico

    DTIC Science & Technology

    2009-04-01

    concrete pipe currently in place. Placing a new pipeline along: (2) the Old El Paso Highway from the BWWSA to CoA facilities on Panorama Drive, or (3...Placing a new pipeline along: (2) the Old El Paso Highway from the BWWSA to CoA facilities on Panorama Drive, or (3) along the La Luz Gate Road from...grandeur of large panoramas and natural landscapes. Noise levels in the vicinity of the proposed project originate primarily from highway and railroad

  11. Coincidental match of numerical simulation and physics

    NASA Astrophysics Data System (ADS)

    Pierre, B.; Gudmundsson, J. S.

    2010-08-01

    Consequences of rapid pressure transients in pipelines range from increased fatigue to leakages and to complete ruptures of pipeline. Therefore, accurate predictions of rapid pressure transients in pipelines using numerical simulations are critical. State of the art modelling of pressure transient in general, and water hammer in particular include unsteady friction in addition to the steady frictional pressure drop, and numerical simulations rely on the method of characteristics. Comparison of rapid pressure transient calculations by the method of characteristics and a selected high resolution finite volume method highlights issues related to modelling of pressure waves and illustrates that matches between numerical simulations and physics are purely coincidental.

  12. 49 CFR 193.2703 - Design and fabrication.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Design and fabrication. 193.2703 Section 193.2703 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  13. 49 CFR 190.341 - Special permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information including operating pressure, leak history, and most recent testing or assessment results; (3) A... equipment, insufficient manpower); (3) A statement indicating how operating the pipeline pursuant to an... damages a pipeline facility resulting in death, serious bodily harm, or property damage exceeding $50,000...

  14. 49 CFR 193.2631 - Internal corrosion control.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Internal corrosion control. 193.2631 Section 193.2631 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  15. 49 CFR 193.2631 - Internal corrosion control.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Internal corrosion control. 193.2631 Section 193.2631 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  16. 49 CFR 193.2631 - Internal corrosion control.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Internal corrosion control. 193.2631 Section 193.2631 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  17. 49 CFR 193.2629 - External corrosion control: buried or submerged components.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2629 External... external corrosive attack must be protected from external corrosion by— (1) Material that has been designed...

  18. 75 FR 358 - Bison Pipeline, L.L.C.; Notice of Availability of the Final Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ..., North Dakota; Two new meter stations; Nineteen mainline valves; and Three pig \\1\\ launcher and pig receiver facilities. \\1\\ A ``pig'' is a mechanical device used to clean or inspect the pipeline. Dependent...

  19. 18 CFR 260.9 - Reports by natural gas pipeline companies on service interruptions and damage to facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., earthquake or other natural disaster or terrorist activity that results in a loss of or reduction in pipeline... reason other than hurricane, earthquake or other natural disaster or terrorist activity, the natural gas...

  20. 18 CFR 260.9 - Reports by natural gas pipeline companies on service interruptions and damage to facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., earthquake or other natural disaster or terrorist activity that results in a loss of or reduction in pipeline... reason other than hurricane, earthquake or other natural disaster or terrorist activity, the natural gas...

  1. 18 CFR 260.9 - Reports by natural gas pipeline companies on service interruptions and damage to facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., earthquake or other natural disaster or terrorist activity that results in a loss of or reduction in pipeline... reason other than hurricane, earthquake or other natural disaster or terrorist activity, the natural gas...

  2. 18 CFR 260.9 - Reports by natural gas pipeline companies on service interruptions and damage to facilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., earthquake or other natural disaster or terrorist activity that results in a loss of or reduction in pipeline... reason other than hurricane, earthquake or other natural disaster or terrorist activity, the natural gas...

  3. 49 CFR 195.436 - Security of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Security of facilities. 195.436 Section 195.436... PIPELINE Operation and Maintenance § 195.436 Security of facilities. Each operator shall provide protection for each pumping station and breakout tank area and other exposed facility (such as scraper traps...

  4. Chemical laser exhaust pipe design research

    NASA Astrophysics Data System (ADS)

    Sun, Yunqiang; Huang, Zhilong; Chen, Zhiqiang; Ren, Zebin; Guo, Longde

    2016-10-01

    In order to weaken the chemical laser exhaust gas influence of the optical transmission, a vent pipe is advised to emissions gas to the outside of the optical transmission area. Based on a variety of exhaust pipe design, a flow field characteristic of the pipe is carried out by numerical simulation and analysis in detail. The research results show that for uniform deflating exhaust pipe, although the pipeline structure is cyclical and convenient for engineering implementation, but there is a phenomenon of air reflows at the pipeline entrance slit which can be deduced from the numerical simulation results. So, this type of pipeline structure does not guarantee seal. For the design scheme of putting the pipeline contract part at the end of the exhaust pipe, or using the method of local area or tail contraction, numerical simulation results show that backflow phenomenon still exists at the pipeline entrance slit. Preliminary analysis indicates that the contraction of pipe would result in higher static pressure near the wall for the low speed flow field, so as to produce counter pressure gradient at the entrance slit. In order to eliminate backflow phenomenon at the pipe entrance slit, concerned with the pipeline type of radial size increase gradually along the flow, flow field property in the pipe is analyzed in detail by numerical simulation methods. Numerical simulation results indicate that there is not reflow phenomenon at entrance slit of the dilated duct. However the cold air inhaled in the slit which makes the temperature of the channel wall is lower than the center temperature. Therefore, this kind of pipeline structure can not only prevent the leak of the gas, but also reduce the wall temperature. In addition, compared with the straight pipe connection way, dilated pipe structure also has periodic structure, which can facilitate system integration installation.

  5. Garden Banks 388 deepwater pipeline span avoidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, S.W.; Sawyer, M.A.; Kenney, T.D.

    1995-12-31

    This paper will describe the span avoidance measures taken for the installation of the Garden Banks 388 deepwater oil and gas gathering pipelines. The two 12 inch pipelines connect a shallow water facility in EI-315 to a deep water subsea template in GB-388. These pipelines run across the irregular continental slope typically found in moderate to deep water in the Gulf of Mexico. To minimize pipeline spans, steps were taken during design, survey, and installation phases of the project. During each phase, as additional information became available, analyses and resulting recommended approaches were refined. This continuity, seldom easily obtained, provedmore » beneficial in translating design work into field results.« less

  6. Implementation of the Pan-STARRS Image Processing Pipeline

    NASA Astrophysics Data System (ADS)

    Fang, Julia; Aspin, C.

    2007-12-01

    Pan-STARRS, or Panoramic Survey Telescope and Rapid Response System, is a wide-field imaging facility that combines small mirrors with gigapixel cameras. It surveys the entire available sky several times a month, which ultimately requires large amounts of data to be processed and stored right away. Accordingly, the Image Processing Pipeline--the IPP--is a collection of software tools that is responsible for the primary image analysis for Pan-STARRS. It includes data registration, basic image analysis such as obtaining master images and detrending the exposures, mosaic calibration when applicable, and lastly, image sum and difference. In this paper I present my work of the installation of IPP 2.1 and 2.2 on a Linux machine, running the Simtest, which is simulated data to test your installation, and finally applying the IPP to two different sets of UH 2.2m Tek data. This work was conducted by a Research Experience for Undergraduates (REU) position at the University of Hawaii's Institute for Astronomy and funded by the NSF.

  7. Pipeline monitoring with unmanned aerial vehicles

    NASA Astrophysics Data System (ADS)

    Kochetkova, L. I.

    2018-05-01

    Pipeline leakage during transportation of combustible substances leads to explosion and fire thus causing death of people and destruction of production and accommodation facilities. Continuous pipeline monitoring allows identifying leaks in due time and quickly taking measures for their elimination. The paper describes the solution of identification of pipeline leakage using unmanned aerial vehicles. It is recommended to apply the spectral analysis with input RGB signal to identify pipeline damages. The application of multi-zone digital images allows defining potential spill of oil hydrocarbons as well as possible soil pollution. The method of multi-temporal digital images within the visible region makes it possible to define changes in soil morphology for its subsequent analysis. The given solution is cost efficient and reliable thus allowing reducing timing and labor resources in comparison with other methods of pipeline monitoring.

  8. 75 FR 3221 - Ruby Pipeline, L.L.C.; Notice of Availability of the Final Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... effects of the construction and operation of the following project facilities: About 675.2 miles of 42... any of the following methods: Web site: http://www.blm.gov/nv/st/en/info/nepa/ruby_pipeline_project...

  9. 78 FR 39717 - Iroquois Gas Transmission System, LP; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ... associated with these new and modified facilities to Constitution Pipeline Company, LLC (Constitution), a... to establish a new receipt interconnection with Constitution and create an incremental 650,000... Constitution to interconnections with Iroquois' mainline system as well as Tennessee Gas Pipeline Company, LLC...

  10. Intermediate Palomar Transient Factory: Realtime Image Subtraction Pipeline

    DOE PAGES

    Cao, Yi; Nugent, Peter E.; Kasliwal, Mansi M.

    2016-09-28

    A fast-turnaround pipeline for realtime data reduction plays an essential role in discovering and permitting followup observations to young supernovae and fast-evolving transients in modern time-domain surveys. In this paper, we present the realtime image subtraction pipeline in the intermediate Palomar Transient Factory. By using highperformance computing, efficient databases, and machine-learning algorithms, this pipeline manages to reliably deliver transient candidates within 10 minutes of images being taken. Our experience in using high-performance computing resources to process big data in astronomy serves as a trailblazer to dealing with data from large-scale time-domain facilities in the near future.

  11. Intermediate Palomar Transient Factory: Realtime Image Subtraction Pipeline

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cao, Yi; Nugent, Peter E.; Kasliwal, Mansi M.

    A fast-turnaround pipeline for realtime data reduction plays an essential role in discovering and permitting followup observations to young supernovae and fast-evolving transients in modern time-domain surveys. In this paper, we present the realtime image subtraction pipeline in the intermediate Palomar Transient Factory. By using highperformance computing, efficient databases, and machine-learning algorithms, this pipeline manages to reliably deliver transient candidates within 10 minutes of images being taken. Our experience in using high-performance computing resources to process big data in astronomy serves as a trailblazer to dealing with data from large-scale time-domain facilities in the near future.

  12. DendroPy: a Python library for phylogenetic computing.

    PubMed

    Sukumaran, Jeet; Holder, Mark T

    2010-06-15

    DendroPy is a cross-platform library for the Python programming language that provides for object-oriented reading, writing, simulation and manipulation of phylogenetic data, with an emphasis on phylogenetic tree operations. DendroPy uses a splits-hash mapping to perform rapid calculations of tree distances, similarities and shape under various metrics. It contains rich simulation routines to generate trees under a number of different phylogenetic and coalescent models. DendroPy's data simulation and manipulation facilities, in conjunction with its support of a broad range of phylogenetic data formats (NEXUS, Newick, PHYLIP, FASTA, NeXML, etc.), allow it to serve a useful role in various phyloinformatics and phylogeographic pipelines. The stable release of the library is available for download and automated installation through the Python Package Index site (http://pypi.python.org/pypi/DendroPy), while the active development source code repository is available to the public from GitHub (http://github.com/jeetsukumaran/DendroPy).

  13. HEP Computing Tools, Grid and Supercomputers for Genome Sequencing Studies

    NASA Astrophysics Data System (ADS)

    De, K.; Klimentov, A.; Maeno, T.; Mashinistov, R.; Novikov, A.; Poyda, A.; Tertychnyy, I.; Wenaus, T.

    2017-10-01

    PanDA - Production and Distributed Analysis Workload Management System has been developed to address ATLAS experiment at LHC data processing and analysis challenges. Recently PanDA has been extended to run HEP scientific applications on Leadership Class Facilities and supercomputers. The success of the projects to use PanDA beyond HEP and Grid has drawn attention from other compute intensive sciences such as bioinformatics. Recent advances of Next Generation Genome Sequencing (NGS) technology led to increasing streams of sequencing data that need to be processed, analysed and made available for bioinformaticians worldwide. Analysis of genomes sequencing data using popular software pipeline PALEOMIX can take a month even running it on the powerful computer resource. In this paper we will describe the adaptation the PALEOMIX pipeline to run it on a distributed computing environment powered by PanDA. To run pipeline we split input files into chunks which are run separately on different nodes as separate inputs for PALEOMIX and finally merge output file, it is very similar to what it done by ATLAS to process and to simulate data. We dramatically decreased the total walltime because of jobs (re)submission automation and brokering within PanDA. Using software tools developed initially for HEP and Grid can reduce payload execution time for Mammoths DNA samples from weeks to days.

  14. 18 CFR 157.215 - Underground storage testing and development.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 7 OF THE NATURAL GAS ACT Interstate Pipeline Blanket Certificates and Authorization Under Section 7..., construct and operate natural gas pipeline and compression facilities, including injection, withdrawal, and... the gas bubble. This map need not be filed if there is no material change from the map previously...

  15. 78 FR 65639 - Questar Pipeline Company; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14-6-000] Questar Pipeline... appurtenant facilities located in Moffat County, Colorado. Specifically, Questar proposes to abandon one Solar Saturn 1200 compressor, a compressor building, two generators and a generator building, a liquids storage...

  16. Feasibility study for wax deposition imaging in oil pipelines by PGNAA technique.

    PubMed

    Cheng, Can; Jia, Wenbao; Hei, Daqian; Wei, Zhiyong; Wang, Hongtao

    2017-10-01

    Wax deposition in pipelines is a crucial problem in the oil industry. A method based on the prompt gamma-ray neutron activation analysis technique was applied to reconstruct the image of wax deposition in oil pipelines. The 2.223MeV hydrogen capture gamma rays were used to reconstruct the wax deposition image. To validate the method, both MCNP simulation and experiments were performed for wax deposited with a maximum thickness of 20cm. The performance of the method was simulated using the MCNP code. The experiment was conducted with a 252 Cf neutron source and a LaBr 3 : Ce detector. A good correspondence between the simulations and the experiments was observed. The results obtained indicate that the present approach is efficient for wax deposition imaging in oil pipelines. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. AMES Stereo Pipeline Derived DEM Accuracy Experiment Using LROC-NAC Stereopairs and Weighted Spatial Dependence Simulation for Lunar Site Selection

    NASA Astrophysics Data System (ADS)

    Laura, J. R.; Miller, D.; Paul, M. V.

    2012-03-01

    An accuracy assessment of AMES Stereo Pipeline derived DEMs for lunar site selection using weighted spatial dependence simulation and a call for outside AMES derived DEMs to facilitate a statistical precision analysis.

  18. Assessment of the service performance of drainage system and transformation of pipeline network based on urban combined sewer system model.

    PubMed

    Peng, Hai-Qin; Liu, Yan; Wang, Hong-Wu; Ma, Lu-Ming

    2015-10-01

    In recent years, due to global climate change and rapid urbanization, extreme weather events occur to the city at an increasing frequency. Waterlogging is common because of heavy rains. In this case, the urban drainage system can no longer meet the original design requirements, resulting in traffic jams and even paralysis and post a threat to urban safety. Therefore, it provides a necessary foundation for urban drainage planning and design to accurately assess the capacity of the drainage system and correctly simulate the transport effect of drainage network and the carrying capacity of drainage facilities. This study adopts InfoWorks Integrated Catchment Management (ICM) to present the two combined sewer drainage systems in Yangpu District, Shanghai (China). The model can assist the design of the drainage system. Model calibration is performed based on the historical rainfall events. The calibrated model is used for the assessment of the outlet drainage and pipe loads for the storm scenario currently existing or possibly occurring in the future. The study found that the simulation and analysis results of the drainage system model were reliable. They could fully reflect the service performance of the drainage system in the study area and provide decision-making support for regional flood control and transformation of pipeline network.

  19. 76 FR 18748 - Gulf South Pipeline Company, LP; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... abandon by sale to Boardwalk Field Services, LLC (Field Services) the Pettus Lateral Facilities in Bee and... taps, and other associated facilities located in Bee and Refugio Counties, to Field Services. Gulf...

  20. 75 FR 21287 - Empire Pipeline Inc.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ..., Inc. (EPI), 6363 Main Street, Williamsville, New York 14221, filed in Docket No. CP10-136-000, an... utilizing EPI's existing cross-border facilities. EPI proposes no new facilities in its application. The...

  1. 75 FR 20653 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed TransCanada...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... Presidential permit for the construction, operation, and maintenance of pipeline facilities at the border of... referred to in Executive Order 13337, as amended, for the construction, connection, operation, or... environmental effects of the construction and operation of the United States portion of the Keystone XL Pipeline...

  2. 77 FR 27533 - Application for Presidential Permit To Construct, Operate and Maintain Pipeline Facilities on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ... pipeline that is designed to transport crude oil produced in the Western Canadian Sedimentary Basin (WCSB) and from other sources to a terminus in Steele City, Nebraska where it is designed to link with an... Order 13337: The Departments of Energy, Defense, Transportation, Homeland Security, Justice, Interior...

  3. 30 CFR 250.910 - Which of my facilities are subject to the Platform Verification Program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., production, and pipeline risers, and riser tensioning systems (each platform must be designed to accommodate all the loads imposed by all risers and riser does not have tensioning systems);(ii) Turrets and... are subject to the Platform Verification Program: (i) Drilling, production, and pipeline risers, and...

  4. 30 CFR 250.910 - Which of my facilities are subject to the Platform Verification Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... pipeline risers, and riser tensioning systems (each platform must be designed to accommodate all the loads imposed by all risers and riser does not have tensioning systems);(ii) Turrets and turret-and-hull... Platform Verification Program: (i) Drilling, production, and pipeline risers, and riser tensioning systems...

  5. 30 CFR 250.910 - Which of my facilities are subject to the Platform Verification Program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., production, and pipeline risers, and riser tensioning systems (each platform must be designed to accommodate all the loads imposed by all risers and riser does not have tensioning systems);(ii) Turrets and... are subject to the Platform Verification Program: (i) Drilling, production, and pipeline risers, and...

  6. 30 CFR 250.910 - Which of my facilities are subject to the Platform Verification Program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., production, and pipeline risers, and riser tensioning systems (each platform must be designed to accommodate all the loads imposed by all risers and riser does not have tensioning systems);(ii) Turrets and... are subject to the Platform Verification Program: (i) Drilling, production, and pipeline risers, and...

  7. 30 CFR 250.910 - Which of my facilities are subject to the Platform Verification Program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., production, and pipeline risers, and riser tensioning systems (each platform must be designed to accommodate all the loads imposed by all risers and riser does not have tensioning systems);(ii) Turrets and... are subject to the Platform Verification Program: (i) Drilling, production, and pipeline risers, and...

  8. 49 CFR 192.727 - Abandonment or deactivation of facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with water or inert materials; and sealed at the ends. However, the pipeline need not be purged when... supplies of gas; purged of gas; in the case of offshore pipelines, filled with water or inert materials...-317-3073. A digital data format is preferred, but hard copy submissions are acceptable if they comply...

  9. 49 CFR 192.727 - Abandonment or deactivation of facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... with water or inert materials; and sealed at the ends. However, the pipeline need not be purged when... supplies of gas; purged of gas; in the case of offshore pipelines, filled with water or inert materials...-317-3073. A digital data format is preferred, but hard copy submissions are acceptable if they comply...

  10. 49 CFR 192.727 - Abandonment or deactivation of facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with water or inert materials; and sealed at the ends. However, the pipeline need not be purged when... supplies of gas; purged of gas; in the case of offshore pipelines, filled with water or inert materials...-317-3073. A digital data format is preferred, but hard copy submissions are acceptable if they comply...

  11. 75 FR 73070 - Empire Pipeline, Inc.; Notice of Availability of the Environmental Assessment for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... and replace pipeline facilities to provide an additional 350,000 dekatherms per day of natural gas... Federal action significantly affecting the quality of the human environment. The New York State Department... agencies have jurisdiction by law or special expertise with respect to resources potentially affected by...

  12. Towards CFD modeling of turbulent pipeline material transportation

    NASA Astrophysics Data System (ADS)

    Shahirpour, Amir; Herzog, Nicoleta; Egbers, Cristoph

    2013-04-01

    Safe and financially efficient pipeline transportation of carbon dioxide is a critical issue in the developing field of the CCS Technology. In this part of the process, carbon dioxide is transported via pipes with diameter of 1.5 m and entry pressure of 150 bar, with Reynolds number of 107 and viscosity of 8×10(-5) Pa.s as dense fluid [1]. Presence of large and small scale structures in the pipeline, high Reynolds numbers at which CO2 should be transferred, and 3 dimensional turbulence caused by local geometrical modifications, increase the importance of simulation of turbulent material transport through the individual components of the CO2 chain process. In this study, incompressible turbulent channel flow and pipe flow have been modeled using OpenFoam, an open source CFD software. In the first step, simulation of a turbulent channel flow has been considered using LES for shear Reynolds number of 395. A simple geometry has been chosen with cyclic fluid inlet and outlet boundary conditions to simulate a fully developed flow. The mesh is gradually refined towards the wall to provide values close enough to the wall for the wall coordinate (y+). Grid resolution study has been conducted for One-Equation model. The accuracy of the results is analyzed with respect to the grid smoothness in order to reach an optimized resolution for carrying out the next simulations. Furthermore, three LES models, One-Equation, Smagorinsky and Dynamic Smagorinsky are applied for the grid resolution of (60 × 100 × 80) in (x, y, z) directions. The results are then validated with reference to the DNS carried out by Moser et al.[2] for the similar geometry using logarithmic velocity profile (U+) and Reynolds stress tensor components. In the second step the similar flow is modeled using Reynolds averaged method. Several RANS models, like K-epsilon and Launder-Reece-Rodi are applied and validated against DNS and LES results in a similar fashion. In the most recent step, it has been intended to generate an optimized LES solver to model turbulent pipe flow for larger Reynolds numbers. The validations are carried out using experiments conducted in Cottbus Large Pipe Test Facility at BTU as a reference [3]. In the mentioned experimental research, evolution of statistical pipe flow quantities, such as turbulence intensity, skewness and flatness are investigated to clarify the development length needed to achieve fully developed turbulence. These observations take place in a relatively large pipe test facility with an inner pipe diameter of Di = 0.19 m and a total length of L = 27 m where a bulk Reynolds number of 8.5×105 can be reached. 1. CO2 pipeline Infrastructure: An analysis of global challenges and opportunities, Final Report For International Energy Agency of Greenhouse Gas Program (2010) 2. J. Kim, P. Moin, R. Moser, Turbulence statistics in fully developed channel flow at low Reynolds number, J.Fluid Mech. 177, 133-166, (1987) 3. F. Zimmer, E.-S. Zanoun and C. Egbers, A study on the influence of triggering pipe flow regarding mean and higher order statistics, Journal of Physics: Conference Series 318 (2011) 032039

  13. 30 CFR 285.902 - What are the general requirements for decommissioning for facilities authorized under my SAP, COP...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Decommissioning... facilities, projects, cables, pipelines, and obstructions; (2) Clear the seafloor of all obstructions created...

  14. Rapid Response R&D for the Propulsion Directorate. Delivery Order 0019: Advanced Alternative Energy Technologies, Subtask: Life Cycle Greenhouse Gas Analysis of Advanced Jet Propulsion Fuels: Fischer-Tropsch Based SPK-1 Case Study

    DTIC Science & Technology

    2011-09-01

    carry finished jet fuel from the CBTL facility. The pipeline connects the CBTL facility to a petroleum refinery located in Wood River, Illinois...Under Option 1, all the blended jet fuel is transported via pipeline from the refinery in Wood River to Chicago’s O’Hare airport. Under Option 2...shipping F-T jet fuel to a refinery in Wood River, Illinois (near St. Louis, Missouri) for blending and final transport of the blended jet fuel to

  15. Microseismic response characteristics modeling and locating of underground water supply pipe leak

    NASA Astrophysics Data System (ADS)

    Wang, J.; Liu, J.

    2015-12-01

    In traditional methods of pipeline leak location, geophones must be located on the pipe wall. If the exact location of the pipeline is unknown, the leaks cannot be identified accurately. To solve this problem, taking into account the characteristics of the pipeline leak, we propose a continuous random seismic source model and construct geological models to investigate the proposed method for locating underground pipeline leaks. Based on two dimensional (2D) viscoacoustic equations and the staggered grid finite-difference (FD) algorithm, the microseismic wave field generated by a leaking pipe is modeled. Cross-correlation analysis and the simulated annealing (SA) algorithm were utilized to obtain the time difference and the leak location. We also analyze and discuss the effect of the number of recorded traces, the survey layout, and the offset and interval of the traces on the accuracy of the estimated location. The preliminary results of the simulation and data field experiment indicate that (1) a continuous random source can realistically represent the leak microseismic wave field in a simulation using 2D visco-acoustic equations and a staggered grid FD algorithm. (2) The cross-correlation method is effective for calculating the time difference of the direct wave relative to the reference trace. However, outside the refraction blind zone, the accuracy of the time difference is reduced by the effects of the refracted wave. (3) The acquisition method of time difference based on the microseismic theory and SA algorithm has a great potential for locating leaks from underground pipelines from an array located on the ground surface. Keywords: Viscoacoustic finite-difference simulation; continuous random source; simulated annealing algorithm; pipeline leak location

  16. Commissioning of a new helium pipeline

    NASA Technical Reports Server (NTRS)

    2000-01-01

    At the commissioning of a new high-pressure helium pipeline at Kennedy Space Center, Ramon Lugo, acting executive director, JPMO , presents a plaque to Center Director Roy Bridges. The pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS); Col. Samuel Dick, representative of the 45th Space Wing; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS. The nine-mile-long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch's worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad.

  17. Commissioning of a new helium pipeline

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS) presents an award of appreciation to H.T. Everett, KSC Propellants manager, at the commissioning of a new high-pressure helium pipeline at Kennedy Space Center. The pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. The nine-mile-long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch's worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Center Director Roy Bridges;); Col. Samuel Dick, representative of the 45th Space Wing; Ramon Lugo, acting executive director, JPMO; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS.

  18. Commissioning of a new helium pipeline

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Jerry Jorgensen welcomes the audience to the commissioning of a new high-pressure helium pipeline at Kennedy Space Center. Jorgensen, with Space Gateway Support (SGS), is the pipeline project manager. To the right is Ramon Lugo, acting executive director, JPMO. Others at the ceremony were Center Director Roy Bridges; Col. Samuel Dick, representative of the 45th Space Wing; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS. The pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. The nine-mile-long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch's worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad.

  19. 30 CFR 285.701 - What must I include in my Facility Design Report?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... design of any facilities, including cables and pipelines, that are outlined in your approved SAP, COP, or... accordance with accepted engineering practices and the approved SAP, GAP, or COP as appropriate. The...

  20. A software framework for pipelined arithmetic algorithms in field programmable gate arrays

    NASA Astrophysics Data System (ADS)

    Kim, J. B.; Won, E.

    2018-03-01

    Pipelined algorithms implemented in field programmable gate arrays are extensively used for hardware triggers in the modern experimental high energy physics field and the complexity of such algorithms increases rapidly. For development of such hardware triggers, algorithms are developed in C++, ported to hardware description language for synthesizing firmware, and then ported back to C++ for simulating the firmware response down to the single bit level. We present a C++ software framework which automatically simulates and generates hardware description language code for pipelined arithmetic algorithms.

  1. Finite Element Analysis and Experimental Study on Elbow Vibration Transmission Characteristics

    NASA Astrophysics Data System (ADS)

    Qing-shan, Dai; Zhen-hai, Zhang; Shi-jian, Zhu

    2017-11-01

    Pipeline system vibration is one of the significant factors leading to the vibration and noise of vessel. Elbow is widely used in the pipeline system. However, the researches about vibration of elbow are little, and there is no systematic study. In this research, we firstly analysed the relationship between elbow vibration transmission characteristics and bending radius by ABAQUS finite element simulation. Then, we conducted the further vibration test to observe the vibration transmission characteristics of different elbows which have the same diameter and different bending radius under different flow velocity. The results of simulation calculation and experiment both showed that the vibration acceleration levels of the pipeline system decreased with the increase of bending radius of the elbow, which was beneficial to reduce the transmission of vibration in the pipeline system. The results could be used as reference for further studies and designs for the low noise installation of pipeline system.

  2. Simulation and Experiment Research on Fatigue Life of High Pressure Air Pipeline Joint

    NASA Astrophysics Data System (ADS)

    Shang, Jin; Xie, Jianghui; Yu, Jian; Zhang, Deman

    2017-12-01

    High pressure air pipeline joint is important part of high pressure air system, whose reliability is related to the safety and stability of the system. This thesis developed a new type-high pressure air pipeline joint, carried out dynamics research on CB316-1995 and new type-high pressure air pipeline joint with finite element method, deeply analysed the join forms of different design schemes and effect of materials on stress, tightening torque and fatigue life of joint. Research team set up vibration/pulse test bench, carried out joint fatigue life contrast test. The result shows: the maximum stress of the joint is inverted in the inner side of the outer sleeve nut, which is consistent with the failure mode of the crack on the outer sleeve nut in practice. Simulation and experiment of fatigue life and tightening torque of new type-high pressure air pipeline joint are better than CB316-1995 joint.

  3. 75 FR 50758 - Leader One Energy, LLC; Supplemental Notice of Intent To Prepare an Environmental Assessment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-17

    ...-diameter pipeline, the Leader One Header Pipeline, to connect the storage facility to Colorado Interstate... (202) 502-8371. For instructions on connecting to eLibrary, refer to the last page of this notice. Land... historic district, site, building, structure, or object included in or eligible for inclusion in the...

  4. 77 FR 41779 - Millennium Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... operate a 15,900 horsepower compressor station and associated appurtenant facilities in the Town of... existing compressor station in Corning, New York and the planned Hancock Compressor Station. According to... Station; About 260 feet of 36-inch-diameter pipeline for suction from the existing Millennium mainline and...

  5. 16 CFR 802.3 - Acquisitions of carbon-based mineral reserves.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... gas, shale or tar sands, or rights to reserves of oil, natural gas, shale or tar sands together with... gas, shale or tar sands, or rights to reserves of oil, natural gas, shale or tar sands and associated... pipeline and pipeline system or processing facility which transports or processes oil and gas after it...

  6. 16 CFR 802.3 - Acquisitions of carbon-based mineral reserves.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... gas, shale or tar sands, or rights to reserves of oil, natural gas, shale or tar sands together with... gas, shale or tar sands, or rights to reserves of oil, natural gas, shale or tar sands and associated... pipeline and pipeline system or processing facility which transports or processes oil and gas after it...

  7. 16 CFR 802.3 - Acquisitions of carbon-based mineral reserves.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... gas, shale or tar sands, or rights to reserves of oil, natural gas, shale or tar sands together with... gas, shale or tar sands, or rights to reserves of oil, natural gas, shale or tar sands and associated... pipeline and pipeline system or processing facility which transports or processes oil and gas after it...

  8. 16 CFR 802.3 - Acquisitions of carbon-based mineral reserves.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... gas, shale or tar sands, or rights to reserves of oil, natural gas, shale or tar sands together with... gas, shale or tar sands, or rights to reserves of oil, natural gas, shale or tar sands and associated... pipeline and pipeline system or processing facility which transports or processes oil and gas after it...

  9. 16 CFR 802.3 - Acquisitions of carbon-based mineral reserves.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... gas, shale or tar sands, or rights to reserves of oil, natural gas, shale or tar sands together with... gas, shale or tar sands, or rights to reserves of oil, natural gas, shale or tar sands and associated... pipeline and pipeline system or processing facility which transports or processes oil and gas after it...

  10. 75 FR 2126 - Calais Pipeline Company, LLC; Calais LNG Project Company, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... 7(c) of the Natural Gas Act (NGA), respectively, as amended and Parts 153, 157, 284 and 380 of the Commission's regulations requesting: (1) Authorization to site, construct and operate a new liquefied natural... approximately 20.7 miles of 36-inch-diameter pipeline and related facilities in order to transport natural gas...

  11. 76 FR 74781 - Sawgrass Storage LLC; Notice of Availability of the Environmental Assessment for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... Affairs, at (866) 208-FERC, or on the FERC Web site ( http://www.ferc.gov ) using the eLibrary link. Click... Midcontinent Express Pipeline's interstate pipeline system; and appurtenant facilities. The FERC staff mailed... interested individuals and groups; newspapers and libraries in the project area; and parties to this...

  12. 78 FR 69403 - South Tahoe Public Utility District; Notice of Preliminary Determination of a Qualifying Conduit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ...-diameter Diamond Valley Ranch Loop pipeline; (2) an approximately 22-foot-wide by 35-foot-long powerhouse... the 18-inch-diameter Diamond Valley Ranch Loop; and (4) appurtenant facilities. The proposed project..., canal, Y pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the...

  13. 78 FR 11637 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Availability of the Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... environmental assessment (EA) for the Rose Lake Expansion Project, proposed by Tennessee Gas Pipeline Company, L... facilities in Tioga and Bradford Counties, Pennsylvania to provide up to 230,000 dekatherms per day of natural gas delivery capacity to the northeast region. The EA assesses the potential environmental effects...

  14. 40 CFR 63.11086 - What requirements must I meet if my facility is a bulk gasoline plant?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facility is a bulk gasoline plant? 63.11086 Section 63.11086 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... gasoline plant? Each owner or operator of an affected bulk gasoline plant, as defined in § 63.11100, must...

  15. 40 CFR 63.11086 - What requirements must I meet if my facility is a bulk gasoline plant?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facility is a bulk gasoline plant? 63.11086 Section 63.11086 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... gasoline plant? Each owner or operator of an affected bulk gasoline plant, as defined in § 63.11100, must...

  16. 40 CFR 63.11086 - What requirements must I meet if my facility is a bulk gasoline plant?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facility is a bulk gasoline plant? 63.11086 Section 63.11086 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... gasoline plant? Each owner or operator of an affected bulk gasoline plant, as defined in § 63.11100, must...

  17. 40 CFR 63.11086 - What requirements must I meet if my facility is a bulk gasoline plant?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility is a bulk gasoline plant? 63.11086 Section 63.11086 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... gasoline plant? Each owner or operator of an affected bulk gasoline plant, as defined in § 63.11100, must...

  18. 40 CFR 63.11086 - What requirements must I meet if my facility is a bulk gasoline plant?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facility is a bulk gasoline plant? 63.11086 Section 63.11086 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission... gasoline plant? Each owner or operator of an affected bulk gasoline plant, as defined in § 63.11100, must...

  19. 78 FR 61987 - Corbett Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-09

    ...), as amended by HREA.... The facility is constructed, operated, or maintained Y for the generation of... Conduit Hydropower Facility Satisfies (Y/ Statutory provision Description N) FPA 30(a)(3)(A), as amended by HREA....... The conduit the facility uses is a tunnel, canal, Y pipeline, aqueduct, flume, ditch...

  20. 49 CFR 193.2001 - Scope of part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... laws (49 U.S.C. 60101 et seq.) and Part 192 of this chapter. (b) This part does not apply to: (1) LNG facilities used by ultimate consumers of LNG or natural gas. (2) LNG facilities used in the course of natural...

  1. 49 CFR 193.2001 - Scope of part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... laws (49 U.S.C. 60101 et seq.) and Part 192 of this chapter. (b) This part does not apply to: (1) LNG facilities used by ultimate consumers of LNG or natural gas. (2) LNG facilities used in the course of natural...

  2. 49 CFR 193.2001 - Scope of part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... laws (49 U.S.C. 60101 et seq.) and Part 192 of this chapter. (b) This part does not apply to: (1) LNG facilities used by ultimate consumers of LNG or natural gas. (2) LNG facilities used in the course of natural...

  3. A method for simulating the release of natural gas from the rupture of high-pressure pipelines in any terrain.

    PubMed

    Deng, Yajun; Hu, Hongbing; Yu, Bo; Sun, Dongliang; Hou, Lei; Liang, Yongtu

    2018-01-15

    The rupture of a high-pressure natural gas pipeline can pose a serious threat to human life and environment. In this research, a method has been proposed to simulate the release of natural gas from the rupture of high-pressure pipelines in any terrain. The process of gas releases from the rupture of a high-pressure pipeline is divided into three stages, namely the discharge, jet, and dispersion stages. Firstly, a discharge model is established to calculate the release rate of the orifice. Secondly, an improved jet model is proposed to obtain the parameters of the pseudo source. Thirdly, a fast-modeling method applicable to any terrain is introduced. Finally, based upon these three steps, a dispersion model, which can take any terrain into account, is established. Then, the dispersion scenarios of released gas in four different terrains are studied. Moreover, the effects of pipeline pressure, pipeline diameter, wind speed and concentration of hydrogen sulfide on the dispersion scenario in real terrain are systematically analyzed. The results provide significant guidance for risk assessment and contingency planning of a ruptured natural gas pipeline. Copyright © 2017. Published by Elsevier B.V.

  4. WFIRST: Simulating the Wide-Field Sky

    NASA Astrophysics Data System (ADS)

    Peeples, Molly; WFIRST Wide Field Imager Simulations Working Group

    2018-01-01

    As astronomy’s first high-resolution wide-field multi-mode instrument, simulated data will play a vital role in the planning for and analysis of data from WFIRST’s WFI (Wide Field Imager) instrument. Part of the key to WFIRST’s scientific success lies in our ability to push the systematics limit, but in order to do so, the WFI pipeline will need to be able to measure and take out said systematics. The efficacy of this pipeline can only be verified with large suites of synthetic data; these data must include both the range of astrophysical sky scenes (from crowded starfields to high-latitude grism data observations) and the systematics from the detector and telescope optics the WFI pipeline aims to mitigate. We summarize here(1) the status of current and planned astrophysical simulations in support of the WFI,(2) the status of current WFI instrument simulators and requirements on future generations thereof, and(3) plans, methods, and requirements on interfacing astrophysical simulations and WFI instrument simulators.

  5. Physical Scaffolding Accelerates the Evolution of Robot Behavior.

    PubMed

    Buckingham, David; Bongard, Josh

    2017-01-01

    In some evolutionary robotics experiments, evolved robots are transferred from simulation to reality, while sensor/motor data flows back from reality to improve the next transferral. We envision a generalization of this approach: a simulation-to-reality pipeline. In this pipeline, increasingly embodied agents flow up through a sequence of increasingly physically realistic simulators, while data flows back down to improve the next transferral between neighboring simulators; physical reality is the last link in this chain. As a first proof of concept, we introduce a two-link chain: A fast yet low-fidelity ( lo-fi) simulator hosts minimally embodied agents, which gradually evolve controllers and morphologies to colonize a slow yet high-fidelity ( hi-fi) simulator. The agents are thus physically scaffolded. We show here that, given the same computational budget, these physically scaffolded robots reach higher performance in the hi-fi simulator than do robots that only evolve in the hi-fi simulator, but only for a sufficiently difficult task. These results suggest that a simulation-to-reality pipeline may strike a good balance between accelerating evolution in simulation while anchoring the results in reality, free the investigator from having to prespecify the robot's morphology, and pave the way to scalable, automated, robot-generating systems.

  6. LOOP marine and estuarine monitoring program, 1978-95 : volume 5 : demersal nekton.

    DOT National Transportation Integrated Search

    1998-01-01

    The Louisiana Offshore Oil Port (LOOP) facilities in coastal Louisiana provide the United States with the country's only Superport for off-loading deep draft tankers. The facilities transport oil ashore through pipelines, and temporarily store oil be...

  7. Conceptual design assessment for the co-firing of bio-refinery supplied lignin project. Quarterly report, July 1--September 30, 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berglund, T.; Ranney, J.T.; Babb, C.L.

    2000-10-01

    The initial design criteria of the MSW to ethanol facility have been completed along with preliminary site identification and layouts for the processing facility. These items are the first step in evaluating the feasibility of this co-located facility. Pilot facility design and modification are underway for the production and dewatering of the lignin fuel. Major process equipment identification has been completed and several key unit operations will be accomplished on rental equipment. Equipment not available for rental or at TVA has been ordered and facility modification and shakedown will begin in October. The study of the interface and resulting impactsmore » on the TVA Colbert facility are underway. The TVA Colbert fossil plant is fully capable of providing a reliable steam supply for the proposed Masada waste processing facility. The preferred supply location in the Colbert steam cycle has been identified as have possible steam pipeline routes to the Colbert boundary. Additional analysis is underway to fully predict the impact of the steam supply on Colbert plant performance and to select a final steam pipeline route.« less

  8. Data Reduction of Jittered Infrared Images Using the ORAC Pipeline

    NASA Astrophysics Data System (ADS)

    Currie, Malcolm; Wright, Gillian; Bridger, Alan; Economou, Frossie

    We relate our experiences using the ORAC data reduction pipeline for jittered images of stars and galaxies. The reduction recipes currently combine applications from several Starlink packages with intelligent Perl recipes to cater to UKIRT data. We describe the recipes and some of the algorithms used, and compare the quality of the resultant mosaics and photometry with the existing facilities.

  9. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    NASA Astrophysics Data System (ADS)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average overrun rates for compressor station material, labor, miscellaneous, land, and total costs are 3%, 60%, 2%, -14%, and 11%, respectively, and cost overruns for cost components are influenced by location and year of completion to different degrees. Monte Carlo models are developed and simulated to evaluate the feasibility of an Alaska in-state gas pipeline by assigning triangular distribution of the values of economic parameters. Simulated results show that the construction of an Alaska in-state natural gas pipeline is feasible at three scenarios: 500 million cubic feet per day (mmcfd), 750 mmcfd, and 1000 mmcfd.

  10. 78 FR 62351 - North Side Canal Company; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-18

    ... The facility is Y HREA. constructed, operated, or maintained for the generation of electric power and... Conduit Hydropower Facility Satisfies Statutory provision Description (Y/N) FPA 30(a)(3)(A), as amended by The conduit the facility Y HREA. uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar...

  11. 78 FR 61985 - City of Astoria, Oregon; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-09

    ...), as amended by HREA.... The facility is constructed, operated, or maintained Y for the generation of... Conduit Hydropower Facility Satisfies Statutory provision Description (Y/N) FPA 30(a)(3)(A), as amended by HREA....... The conduit the facility uses is a tunnel, canal, Y pipeline, aqueduct, flume, ditch, or...

  12. 78 FR 1851 - Sabine Pass Liquefaction, LLC and Sabine Pass LNG, L.P.; Notice of Intent To Prepare an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-09

    ... gas liquids (NGL) truck loading facilities. A Project location map depicting the proposed facilities..., metering and send-out facilities; four gas pipeline meter stations; additional workspaces, laydown and... project is further developed. On natural gas projects, the APE at a minimum encompasses all areas subject...

  13. 49 CFR 195.575 - Which facilities must I electrically isolate and what inspections, tests, and safeguards are...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Corrosion Control § 195.575 Which facilities must I electrically isolate and what inspections, tests, and... isolation of a portion of a pipeline is necessary to facilitate the application of corrosion control. (c...

  14. 77 FR 67055 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... natural gas liquids (NGLs), propylene, and ethylene between the United States and Canada. Lines 16, 18 and... maintenance at the borders of the United States, of facilities for the exportation or importation of liquid...

  15. Evaluation of Underwater Adhesives and Friction Coatings for In Situ Attachment of Fiber Optic Sensor System for Subsea Applications

    NASA Technical Reports Server (NTRS)

    Tang, Henry H.; Le, Suy Q.; Orndoff, Evelyne S.; Smith, Frederick D.; Tapia, Alma S.; Brower, David V.

    2012-01-01

    Integrity and performance monitoring of subsea pipelines and structures provides critical information for managing offshore oil and gas production operation and preventing environmentally damaging and costly catastrophic failure. Currently pipeline monitoring devices require ground assembly and installation prior to the underwater deployment of the pipeline. A monitoring device that could be installed in situ on the operating underwater structures could enhance the productivity and improve the safety of current offshore operation. Through a Space Act Agreement (SAA) between the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) and Astro Technology, Inc. (ATI), JSC provides technical expertise and testing facilities to support the development of fiber optic sensor technologies by ATI. This paper details the first collaboration effort between NASA JSC and ATI in evaluating underwater applicable adhesives and friction coatings for attaching fiber optic sensor system to subsea pipeline. A market survey was conducted to examine different commercial ]off ]the ]shelf (COTS) underwater adhesive systems and to select adhesive candidates for testing and evaluation. Four COTS epoxy based underwater adhesives were selected and evaluated. The adhesives were applied and cured in simulated seawater conditions and then evaluated for application characteristics and adhesive strength. The adhesive that demonstrated the best underwater application characteristics and highest adhesive strength were identified for further evaluation in developing an attachment system that could be deployed in the harsh subsea environment. Various friction coatings were also tested in this study to measure their shear strengths for a mechanical clamping design concept for attaching fiber optic sensor system. A COTS carbide alloy coating was found to increase the shear strength of metal to metal clamping interface by up to 46 percent. This study provides valuable data for assessing the feasibility of developing the next generation fiber optic senor system that could be retrofitted onto existing subsea pipeline structures.

  16. Towards an Integrated Model of the WEAVE Performance

    NASA Astrophysics Data System (ADS)

    Ham, S. J.; Dalton, G.

    2016-10-01

    WEAVE is a new facility instrument for the 4.2 m William Herschel Telescope (WHT). The instrument has a 2° field of view and covers a wavelength range of 366-950 nm with up to 960 simultaneous spectra in each observation. The spectrograph consists of a collimator mirror and two correcting lenses before a VPH grating and two 8-lens cameras. The two cameras have been designed to have the same lens shapes. Here we report on the development of detailed simulations for the verification of the whole data reduction procedure and analysis pipeline, and for the generation of high signal-to-noise reference images that can be used as fitting templates for fiber positions and PSF mapping.

  17. Understanding gene functions and disease mechanisms: Phenotyping pipelines in the German Mouse Clinic.

    PubMed

    Fuchs, Helmut; Aguilar-Pimentel, Juan Antonio; Amarie, Oana V; Becker, Lore; Calzada-Wack, Julia; Cho, Yi-Li; Garrett, Lillian; Hölter, Sabine M; Irmler, Martin; Kistler, Martin; Kraiger, Markus; Mayer-Kuckuk, Philipp; Moreth, Kristin; Rathkolb, Birgit; Rozman, Jan; da Silva Buttkus, Patricia; Treise, Irina; Zimprich, Annemarie; Gampe, Kristine; Hutterer, Christine; Stöger, Claudia; Leuchtenberger, Stefanie; Maier, Holger; Miller, Manuel; Scheideler, Angelika; Wu, Moya; Beckers, Johannes; Bekeredjian, Raffi; Brielmeier, Markus; Busch, Dirk H; Klingenspor, Martin; Klopstock, Thomas; Ollert, Markus; Schmidt-Weber, Carsten; Stöger, Tobias; Wolf, Eckhard; Wurst, Wolfgang; Yildirim, Ali Önder; Zimmer, Andreas; Gailus-Durner, Valérie; Hrabě de Angelis, Martin

    2017-09-29

    Since decades, model organisms have provided an important approach for understanding the mechanistic basis of human diseases. The German Mouse Clinic (GMC) was the first phenotyping facility that established a collaboration-based platform for phenotype characterization of mouse lines. In order to address individual projects by a tailor-made phenotyping strategy, the GMC advanced in developing a series of pipelines with tests for the analysis of specific disease areas. For a general broad analysis, there is a screening pipeline that covers the key parameters for the most relevant disease areas. For hypothesis-driven phenotypic analyses, there are thirteen additional pipelines with focus on neurological and behavioral disorders, metabolic dysfunction, respiratory system malfunctions, immune-system disorders and imaging techniques. In this article, we give an overview of the pipelines and describe the scientific rationale behind the different test combinations. Copyright © 2017 Elsevier B.V. All rights reserved.

  18. KSC-00padig073

    NASA Image and Video Library

    2000-11-02

    Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS) presents an award of appreciation to H.T. Everett, KSC Propellants manager, at the commissioning of a new high-pressure helium pipeline at Kennedy Space Center. The pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. The nine-mile-long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Center Director Roy Bridges;); Col. Samuel Dick, representative of the 45th Space Wing; Ramon Lugo, acting executive director, JPMO; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS

  19. KSC-00padig071

    NASA Image and Video Library

    2000-11-02

    At the commissioning of a new high-pressure helium pipeline at Kennedy Space Center, Ramon Lugo, acting executive director, JPMO , presents a plaque to Center Director Roy Bridges. The pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS); Col. Samuel Dick, representative of the 45th Space Wing; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS. The nine-mile-long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad

  20. KSC-00padig070

    NASA Image and Video Library

    2000-11-02

    Jerry Jorgensen welcomes the audience to the commissioning of a new high-pressure helium pipeline at Kennedy Space Center. Jorgensen, with Space Gateway Support (SGS), is the pipeline project manager. To the right is Ramon Lugo, acting executive director, JPMO. Others at the ceremony were Center Director Roy Bridges; Col. Samuel Dick, representative of the 45th Space Wing; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS. The pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. The nine-mile-long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad

  1. KSC00padig071

    NASA Image and Video Library

    2000-11-02

    At the commissioning of a new high-pressure helium pipeline at Kennedy Space Center, Ramon Lugo, acting executive director, JPMO , presents a plaque to Center Director Roy Bridges. The pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS); Col. Samuel Dick, representative of the 45th Space Wing; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS. The nine-mile-long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad

  2. KSC00padig073

    NASA Image and Video Library

    2000-11-02

    Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS) presents an award of appreciation to H.T. Everett, KSC Propellants manager, at the commissioning of a new high-pressure helium pipeline at Kennedy Space Center. The pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. The nine-mile-long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Center Director Roy Bridges;); Col. Samuel Dick, representative of the 45th Space Wing; Ramon Lugo, acting executive director, JPMO; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS

  3. Commissioning of a new helium pipeline

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Center Director Roy Bridges addresses the audience at the commissioning of a new high-pressure helium pipeline at Kennedy Space Center that will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. The nine-mile- long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch's worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS); Col. Samuel Dick, representative of the 45th Space Wing; Ramon Lugo, acting executive director, JPMO; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS.

  4. 50 CFR 29.21-2 - Application procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) State of local governments or agencies or instrumentalities thereof except as to rights-of-way... schedule: (A) For linear facilities (e.g., powerlines, pipelines, roads, etc.). Length Payment Less than 5... application includes both linear and nonlinear facilities, payment will be the aggregate of amounts under...

  5. 50 CFR 29.21-2 - Application procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) State of local governments or agencies or instrumentalities thereof except as to rights-of-way... schedule: (A) For linear facilities (e.g., powerlines, pipelines, roads, etc.). Length Payment Less than 5... application includes both linear and nonlinear facilities, payment will be the aggregate of amounts under...

  6. Gasoline Distribution Facilities (Bulk Gasoline Terminals and Pipeline Breakout Stations) Air Toxics Rule Fact Sheets

    EPA Pesticide Factsheets

    This page contains a November 1994 fact sheet for the final NESHAP for Gasoline Distribution Facilities. This page also contains a December fact sheet with information regarding the final amendments to the 2003 final rule for the NESHAP.

  7. Changes in the Arctic: Background and Issues for Congress

    DTIC Science & Technology

    2016-05-12

    discovery of new oil and gas deposits far from existing storage, pipelines , and shipping facilities cannot be developed until infrastructure is built...markets. Other questions in need of answers include the status of port, pipeline , and liquid natural gas infrastructure; whether methane hydrates...Changes to the Arctic brought about by warming temperatures will likely allow more exploration for oil, gas , and minerals. Warming that causes

  8. Phylogenetic characterization of a corrosive consortium isolated from a sour gas pipeline.

    PubMed

    Jan-Roblero, J; Romero, J M; Amaya, M; Le Borgne, S

    2004-06-01

    Biocorrosion is a common problem in oil and gas industry facilities. Characterization of the microbial populations responsible for biocorrosion and the interactions between different microorganisms with metallic surfaces is required in order to implement efficient monitoring and control strategies. Denaturing gradient gel electrophoresis (DGGE) analysis was used to separate PCR products and sequence analysis revealed the bacterial composition of a consortium obtained from a sour gas pipeline in the Gulf of Mexico. Only one species of sulfate-reducing bacteria (SRB) was detected in this consortium. The rest of the population consisted of enteric bacteria with different characteristics and metabolic capabilities potentially related to biocorrosion. Therefore, several types of bacteria may be involved in biocorrosion arising from natural biofilms that develop in industrial facilities. The low abundance of the detected SRB was evidenced by environmental scanning electron microscopy (ESEM). In addition, the localized corrosion of pipeline steel in the presence of the consortium was clearly observed by ESEM after removing the adhered bacteria.

  9. CamBAfx: Workflow Design, Implementation and Application for Neuroimaging

    PubMed Central

    Ooi, Cinly; Bullmore, Edward T.; Wink, Alle-Meije; Sendur, Levent; Barnes, Anna; Achard, Sophie; Aspden, John; Abbott, Sanja; Yue, Shigang; Kitzbichler, Manfred; Meunier, David; Maxim, Voichita; Salvador, Raymond; Henty, Julian; Tait, Roger; Subramaniam, Naresh; Suckling, John

    2009-01-01

    CamBAfx is a workflow application designed for both researchers who use workflows to process data (consumers) and those who design them (designers). It provides a front-end (user interface) optimized for data processing designed in a way familiar to consumers. The back-end uses a pipeline model to represent workflows since this is a common and useful metaphor used by designers and is easy to manipulate compared to other representations like programming scripts. As an Eclipse Rich Client Platform application, CamBAfx's pipelines and functions can be bundled with the software or downloaded post-installation. The user interface contains all the workflow facilities expected by consumers. Using the Eclipse Extension Mechanism designers are encouraged to customize CamBAfx for their own pipelines. CamBAfx wraps a workflow facility around neuroinformatics software without modification. CamBAfx's design, licensing and Eclipse Branding Mechanism allow it to be used as the user interface for other software, facilitating exchange of innovative computational tools between originating labs. PMID:19826470

  10. Supply chain management and economic valuation of real options in the natural gas and liquefied natural gas industry

    NASA Astrophysics Data System (ADS)

    Wang, Mulan Xiaofeng

    My dissertation concentrates on several aspects of supply chain management and economic valuation of real options in the natural gas and liquefied natural gas (LNG) industry, including gas pipeline transportations, ocean LNG shipping logistics, and downstream storage. Chapter 1 briefly introduces the natural gas and LNG industries, and the topics studied in this thesis. Chapter 2 studies how to value U.S. natural gas pipeline network transport contracts as real options. It is common for natural gas shippers to value and manage contracts by simple adaptations of financial spread option formulas that do not fully account for the implications of the capacity limits and the network structure that distinguish these contracts. In contrast, we show that these operational features can be fully captured and integrated with financial considerations in a fairly easy and managerially significant manner by a model that combines linear programming and simulation. We derive pathwise estimators for the so called deltas and structurally characterize them. We interpret them in a novel fashion as discounted expectations, under a specific weighing distribution, of the amounts of natural gas to be procured/marketed when optimally using pipeline capacity. Based on the actual prices of traded natural gas futures and basis swaps, we show that an enhanced version of the common approach employed in practice can significantly underestimate the true value of natural gas pipeline network capacity. Our model also exhibits promising financial (delta) hedging performance. Thus, this model emerges as an easy to use and useful tool that natural gas shippers can employ to support their valuation and delta hedging decisions concerning natural gas pipeline network transport capacity contracts. Moreover, the insights that follow from our data analysis have broader significance and implications in terms of the management of real options beyond our specific application. Motivated by current developments in the LNG industry, Chapter 3 studies the operations of LNG supply chains facing both supply and price risk. To model the supply uncertainty, we employ a closed-queuing-network (CQN) model to represent upstream LNG production and shipping, via special oceans-going tankers, to a downstream re-gasification facility in the U.S, which sells natural gas into the wholesale spot market. The CQN shipping model analytically generates the unloaded amount probability distribution. Price uncertainty is captured by the spot price, which experiences both volatility and significant seasonality, i.e., higher prices in winter. We use a trinomial lattice to model the price uncertainty, and calibrate to the extended forward curves. Taking the outputs from the CQN model and the spot price model as stochastic inputs, we formulate a real option inventory-release model to study the benefit of optimally managing a downstream LNG storage facility. This allows characterization of the structure of the optimal inventory management policy. An interesting finding is that when it is optimal to sell, it is not necessarily optimal to sell the entire available inventory. The model can be used by LNG players to value and manage the real option to store LNG at a re-gasification facility, and is easy to be implemented. For example, this model is particularly useful to value leasing contracts for portions of the facility capacity. Real data is used to assess the value of the real option to store LNG at the downstream re-gasification facility, and, contrary to what has been claimed by some practitioners, we find that it has significant value (several million dollars). Chapter 4 studies the importance of modeling the shipping variability when valuing and managing a downstream LNG storage facility. The shipping model presented in Chapter 3 uses a "rolling forward" method to generate the independent and identically distributed (i.i.d.) unloaded amount in each decision period. We study the merit of the i.i.d. assumption by using simulation and developing an upper bound. We show that the model, which uses the i.i.d. unloaded amount, provides a good estimation of the storage value, and yields a near optimal inventory control policy. We also test the performance of a model that uses constant throughput to determine the inventory release policy. This model performs worse than the model of Chapter 3 for storage valuation purposes, but can be used to suggest the optimal inventory control policy, especially when the ratio of flow rate to storage size is high, i.e., storage is scarce. Chapter 5 summarizes the contributions of this thesis.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, H.L.; Spronsen, G. van; Klaus, E.H.

    A simulation model of the dynamics of a by-pass pig and related two-phase flow behavior along with field trials of the pig in a dry-gas pipeline have revealed significant gains in use of a by-pass pig in modifying gas and liquid production rates. The method can widen the possibility of applying two-phase flow pipeline transportation to cases in which separator or slug-catcher capacity is limited by practicality or cost. Pigging two-phase pipelines normally generates large liquid slug volumes in front of the pig. These require large separators or slug catchers. Using a high by-pass pig to disperse the liquid andmore » reduce the maximum liquid production rate before pig arrival has been investigated by Shell Exploration and Production companies. A simulation model of the dynamics of the pig and related two-phase flow behavior in the pipeline was used to predict the performance of by-pass pigs. Field trials in a dry-gas pipeline were carried out to provide friction data and to validate the model. The predicted mobility of the high by-pass pig in the pipeline and risers was verified and the beneficial effects due to the by-pass concept exceeded the prediction of the simplified model.« less

  12. 49 CFR 192.171 - Compressor stations: Additional safety equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Compressor stations: Additional safety equipment... Pipeline Components § 192.171 Compressor stations: Additional safety equipment. (a) Each compressor station must have adequate fire protection facilities. If fire pumps are a part of these facilities, their...

  13. 76 FR 81495 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ... Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Gasoline Distribution Bulk Terminals, Bulk Plants, Pipeline Facilities and Gasoline Dispensing Facilities AGENCY: Environmental... http://www.regulations.gov . Title: NESHAP for Gasoline Distribution Bulk Terminals, Bulk Plants...

  14. 18 CFR 157.212 - Synthetic and liquefied natural gas facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... natural gas facilities. 157.212 Section 157.212 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR CERTIFICATES... 7 OF THE NATURAL GAS ACT Interstate Pipeline Blanket Certificates and Authorization Under Section 7...

  15. 30 CFR 715.19 - Use of explosives.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wells, petroleum or gas-storage facilities, municipal water-storage facilities, fluid-transmission pipelines, gas or oil-collection lines, or water and sewage lines; and (C) 500 feet of an underground mine... explosive materials shall— (i) Have demonstrated a knowledge of, and a willingness to comply with, safety...

  16. 18 CFR 157.212 - Synthetic and liquefied natural gas facilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... natural gas facilities. 157.212 Section 157.212 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR CERTIFICATES... 7 OF THE NATURAL GAS ACT Interstate Pipeline Blanket Certificates and Authorization Under Section 7...

  17. Automated protein structure modeling in CASP9 by I-TASSER pipeline combined with QUARK-based ab initio folding and FG-MD-based structure refinement

    PubMed Central

    Xu, Dong; Zhang, Jian; Roy, Ambrish; Zhang, Yang

    2011-01-01

    I-TASSER is an automated pipeline for protein tertiary structure prediction using multiple threading alignments and iterative structure assembly simulations. In CASP9 experiments, two new algorithms, QUARK and FG-MD, were added to the I-TASSER pipeline for improving the structural modeling accuracy. QUARK is a de novo structure prediction algorithm used for structure modeling of proteins that lack detectable template structures. For distantly homologous targets, QUARK models are found useful as a reference structure for selecting good threading alignments and guiding the I-TASSER structure assembly simulations. FG-MD is an atomic-level structural refinement program that uses structural fragments collected from the PDB structures to guide molecular dynamics simulation and improve the local structure of predicted model, including hydrogen-bonding networks, torsion angles and steric clashes. Despite considerable progress in both the template-based and template-free structure modeling, significant improvements on protein target classification, domain parsing, model selection, and ab initio folding of beta-proteins are still needed to further improve the I-TASSER pipeline. PMID:22069036

  18. 49 CFR 193.2909 - Security communications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...) Prompt communications between personnel having supervisory security duties and law enforcement officials...

  19. Simulating observations with HARMONI: the integral field spectrograph for the European Extremely Large Telescope

    NASA Astrophysics Data System (ADS)

    Zieleniewski, Simon; Thatte, Niranjan; Kendrew, Sarah; Houghton, Ryan; Tecza, Matthias; Clarke, Fraser; Fusco, Thierry; Swinbank, Mark

    2014-07-01

    With the next generation of extremely large telescopes commencing construction, there is an urgent need for detailed quantitative predictions of the scientific observations that these new telescopes will enable. Most of these new telescopes will have adaptive optics fully integrated with the telescope itself, allowing unprecedented spatial resolution combined with enormous sensitivity. However, the adaptive optics point spread function will be strongly wavelength dependent, requiring detailed simulations that accurately model these variations. We have developed a simulation pipeline for the HARMONI integral field spectrograph, a first light instrument for the European Extremely Large Telescope. The simulator takes high-resolution input data-cubes of astrophysical objects and processes them with accurate atmospheric, telescope and instrumental effects, to produce mock observed cubes for chosen observing parameters. The output cubes represent the result of a perfect data reduc- tion process, enabling a detailed analysis and comparison between input and output, showcasing HARMONI's capabilities. The simulations utilise a detailed knowledge of the telescope's wavelength dependent adaptive op- tics point spread function. We discuss the simulation pipeline and present an early example of the pipeline functionality for simulating observations of high redshift galaxies.

  20. Dedicated nuclear facilities for electrolytic hydrogen production

    NASA Technical Reports Server (NTRS)

    Foh, S. E.; Escher, W. J. D.; Donakowski, T. D.

    1979-01-01

    An advanced technology, fully dedicated nuclear-electrolytic hydrogen production facility is presented. This plant will produce hydrogen and oxygen only and no electrical power will be generated for off-plant use. The conceptual design was based on hydrogen production to fill a pipeline at 1000 psi and a 3000 MW nuclear base, and the base-line facility nuclear-to-shaftpower and shaftpower-to-electricity subsystems, the water treatment subsystem, electricity-to-hydrogen subsystem, hydrogen compression, efficiency, and hydrogen production cost are discussed. The final conceptual design integrates a 3000 MWth high-temperature gas-cooled reactor operating at 980 C helium reactor-out temperature, direct dc electricity generation via acyclic generators, and high-current density, high-pressure electrolyzers based on the solid polymer electrolyte approach. All subsystems are close-coupled and optimally interfaced and pipeline hydrogen is produced at 1000 psi. Hydrogen costs were about half of the conventional nuclear electrolysis process.

  1. Thunder Energy Inc. applications to modify an existing sweet gas processing facility to a sour gas processing facility and increase the hydrogen sulfide concentration of existing pipelines, Kelsey area: Examiner report 98-2, application numbers 1007719 and 1013399

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Thunder Energy Inc. received approval from the Alberta Energy and Utilities Board for modification of an existing gas plant to process sour gas, and also applied for permission to increase the hydrogen sulfide content of its existing pipelines in the Kelsey area. This report presents the views of Thunder Energy, the Board, and various intervenors at a hearing held to consider objections to the plant approval and matters related to the application. Issues considered include the need for sour gas processing, the need for the plant modification as opposed to the feasibility of using existing sour gas processing facilities, environmentalmore » impacts, and the requirements for notification of industry in the area. The report concludes with the Board`s decision.« less

  2. Application of distributed optical fiber sensing technologies to the monitoring of leakage and abnormal disturbance of oil pipeline

    NASA Astrophysics Data System (ADS)

    Yang, Xiaojun; Zhu, Xiaofei; Deng, Chi; Li, Junyi; Liu, Cheng; Yu, Wenpeng; Luo, Hui

    2017-10-01

    To improve the level of management and monitoring of leakage and abnormal disturbance of long distance oil pipeline, the distributed optical fiber temperature and vibration sensing system is employed to test the feasibility for the healthy monitoring of a domestic oil pipeline. The simulating leakage and abnormal disturbance affairs of oil pipeline are performed in the experiment. It is demonstrated that the leakage and abnormal disturbance affairs of oil pipeline can be monitored and located accurately with the distributed optical fiber sensing system, which exhibits good performance in the sensitivity, reliability, operation and maintenance etc., and shows good market application prospect.

  3. Concept of an advanced hyperspectral remote sensing system for pipeline monitoring

    NASA Astrophysics Data System (ADS)

    Keskin, Göksu; Teutsch, Caroline D.; Lenz, Andreas; Middelmann, Wolfgang

    2015-10-01

    Areas occupied by oil pipelines and storage facilities are prone to severe contamination due to leaks caused by natural forces, poor maintenance or third parties. These threats have to be detected as quickly as possible in order to prevent serious environmental damage. Periodical and emergency monitoring activities need to be carried out for successful disaster management and pollution minimization. Airborne remote sensing stands out as an appropriate choice to operate either in an emergency or periodically. Hydrocarbon Index (HI) and Hydrocarbon Detection Index (HDI) utilize the unique absorption features of hydrocarbon based materials at SWIR spectral region. These band ratio based methods require no a priori knowledge of the reference spectrum and can be calculated in real time. This work introduces a flexible airborne pipeline monitoring system based on the online quasi-operational hyperspectral remote sensing system developed at Fraunhofer IOSB, utilizing HI and HDI for oil leak detection on the data acquired by an SWIR imaging sensor. Robustness of HI and HDI compared to state of the art detection algorithms is evaluated in an experimental setup using a synthetic dataset, which was prepared in a systematic way to simulate linear mixtures of selected background and oil spectra consisting of gradually decreasing percentages of oil content. Real airborne measurements in Ettlingen, Germany are used to gather background data while the crude oil spectrum was measured with a field spectrometer. The results indicate that the system can be utilized for online and offline monitoring activities.

  4. 76 FR 24473 - Transwestern Pipeline Company, LLC; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-191-000] Transwestern...,000 HP reciprocating gas engines, compressors, and ancillary facilities (Project Facilities) at its... to access the document. For assistance, contact FERC at [email protected] or call toll-free...

  5. 7 CFR 1940.312 - Environmental assessments for Class II actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... so. Subsequently, an approved loan will be structured so as to be consistent with any conservation..., canals, pipelines, and sprinklers either designed to irrigate more than 160 acres or that would serve any... facility has unlimited continuous flow watering systems; 30,00 laying hens or broilers when facility has...

  6. 49 CFR 192.171 - Compressor stations: Additional safety equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Design of... must have adequate fire protection facilities. If fire pumps are a part of these facilities, their... event of inadequate cooling or lubrication of the unit. (d) Each compressor station gas engine that...

  7. 76 FR 36526 - Columbia Gas Transmission, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ....47-mile of 20-inch pipeline to transport natural gas for Virginia Power Services Energy Corp., Inc...- fired electric generation facility being constructed by Virginia Electric and Power Company d/b/a... expects to complete the construction and place the electric generation facility in service during 2014...

  8. Pipeline transport and simultaneous saccharification of corn stover.

    PubMed

    Kumar, Amit; Cameron, Jay B; Flynn, Peter C

    2005-05-01

    Pipeline transport of corn stover delivered by truck from the field is evaluated against a range of truck transport costs. Corn stover transported by pipeline at 20% solids concentration (wet basis) or higher could directly enter an ethanol fermentation plant, and hence the investment in the pipeline inlet end processing facilities displaces comparable investment in the plant. At 20% solids, pipeline transport of corn stover costs less than trucking at capacities in excess of 1.4 M drytonnes/yr when compared to a mid range of truck transport cost (excluding any credit for economies of scale achieved in the ethanol fermentation plant from larger scale due to multiple pipelines). Pipelining of corn stover gives the opportunity to conduct simultaneous transport and saccharification (STS). If current enzymes are used, this would require elevated temperature. Heating of the slurry for STS, which in a fermentation plant is achieved from waste heat, is a significant cost element (more than 5 cents/l of ethanol) if done at the pipeline inlet unless waste heat is available, for example from an electric power plant located adjacent to the pipeline inlet. Heat loss in a 1.26 m pipeline carrying 2 M drytonnes/yr is about 5 degrees C at a distance of 400 km in typical prairie clay soils, and would not likely require insulation; smaller pipelines or different soil conditions might require insulation for STS. Saccharification in the pipeline would reduce the need for investment in the fermentation plant, saving about 0.2 cents/l of ethanol. Transport of corn stover in multiple pipelines offers the opportunity to develop a large ethanol fermentation plant, avoiding some of the diseconomies of scale that arise from smaller plants whose capacities are limited by issues of truck congestion.

  9. SimVascular: An Open Source Pipeline for Cardiovascular Simulation.

    PubMed

    Updegrove, Adam; Wilson, Nathan M; Merkow, Jameson; Lan, Hongzhi; Marsden, Alison L; Shadden, Shawn C

    2017-03-01

    Patient-specific cardiovascular simulation has become a paradigm in cardiovascular research and is emerging as a powerful tool in basic, translational and clinical research. In this paper we discuss the recent development of a fully open-source SimVascular software package, which provides a complete pipeline from medical image data segmentation to patient-specific blood flow simulation and analysis. This package serves as a research tool for cardiovascular modeling and simulation, and has contributed to numerous advances in personalized medicine, surgical planning and medical device design. The SimVascular software has recently been refactored and expanded to enhance functionality, usability, efficiency and accuracy of image-based patient-specific modeling tools. Moreover, SimVascular previously required several licensed components that hindered new user adoption and code management and our recent developments have replaced these commercial components to create a fully open source pipeline. These developments foster advances in cardiovascular modeling research, increased collaboration, standardization of methods, and a growing developer community.

  10. The visual and radiological inspection of a pipeline using a teleoperated pipe crawler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fogle, R.F.; Kuelske, K.; Kellner, R.A.

    1996-07-01

    In the 1950s the Savannah River Site built an open, unlined retention basin for temporary storage of potentially radionuclide-contaminated cooling water form a chemical separations process and storm water drainage from a nearby waste management facility which stored large quantities of nuclear fission by-products in carbon steel tanks. An underground process pipeline lead to the basin. Once the closure of the basin in 1972, further assessment has been required. A visual and radiological inspection of the pipeline was necessary to aid in the decision about further remediation. This article describes the inspection using a teleoperated pipe crawler. 5 figs.

  11. Template-based and free modeling of I-TASSER and QUARK pipelines using predicted contact maps in CASP12.

    PubMed

    Zhang, Chengxin; Mortuza, S M; He, Baoji; Wang, Yanting; Zhang, Yang

    2018-03-01

    We develop two complementary pipelines, "Zhang-Server" and "QUARK", based on I-TASSER and QUARK pipelines for template-based modeling (TBM) and free modeling (FM), and test them in the CASP12 experiment. The combination of I-TASSER and QUARK successfully folds three medium-size FM targets that have more than 150 residues, even though the interplay between the two pipelines still awaits further optimization. Newly developed sequence-based contact prediction by NeBcon plays a critical role to enhance the quality of models, particularly for FM targets, by the new pipelines. The inclusion of NeBcon predicted contacts as restraints in the QUARK simulations results in an average TM-score of 0.41 for the best in top five predicted models, which is 37% higher than that by the QUARK simulations without contacts. In particular, there are seven targets that are converted from non-foldable to foldable (TM-score >0.5) due to the use of contact restraints in the simulations. Another additional feature in the current pipelines is the local structure quality prediction by ResQ, which provides a robust residue-level modeling error estimation. Despite the success, significant challenges still remain in ab initio modeling of multi-domain proteins and folding of β-proteins with complicated topologies bound by long-range strand-strand interactions. Improvements on domain boundary and long-range contact prediction, as well as optimal use of the predicted contacts and multiple threading alignments, are critical to address these issues seen in the CASP12 experiment. © 2017 Wiley Periodicals, Inc.

  12. An Epoch of Reionization simulation pipeline based on BEARS

    NASA Astrophysics Data System (ADS)

    Krause, Fabian; Thomas, Rajat M.; Zaroubi, Saleem; Abdalla, Filipe B.

    2018-10-01

    The quest to unlock the mysteries of the Epoch of Reionization (EoR) is well poised with many experiments at diverse wavelengths beginning to gather data. Albeit these efforts, we are yet uncertain about the various factors that influence the EoR which include, the nature of the sources, their spectral characteristics (blackbody temperatures, power-law indices), clustering property, efficiency, duty cycle etc. Given these physical uncertainties that define the EoR, we need fast and efficient computational methods to model and analyze the data in order to provide confidence bounds on the parameters that influence the brightness temperature at 21-cm. Towards this goal we developed a pipeline that combines dark matter-only N-body simulations with exact 1-dimensional radiative transfer computations to approximate exact 3-dimensional radiative transfer. Because these simulations are about two to three orders of magnitude faster than the exact 3-dimensional methods, they can be used to explore the parameter space of the EoR systematically. A fast scheme like this pipeline could be incorporated into a Bayesian framework for parameter estimation. In this paper we detail the construction of the pipeline and describe how to use the software which is being made publicly available. We show the results of running the pipeline for four test cases of sources with various spectral energy distributions and compare their outputs using various statistics.

  13. 49 CFR 193.2445 - Sources of power.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Equipment Vaporization Equipment § 193.2445 Sources of power. (a) Electrical...

  14. 49 CFR 193.2905 - Protective enclosures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... surrounded by a protective enclosure: (1) Storage tanks; (2) Impounding systems; (3) Vapor barriers; (4...

  15. Ballasting pipeline moving in horizontal well as method of control sticking phenomenon

    NASA Astrophysics Data System (ADS)

    Toropov, V. S.; Toropov, E. S.

    2018-05-01

    The mechanism of the phenomenon of sticking a pipeline moving in a well while pulled by the facility horizontal directional drilling is investigated. A quantitative evaluation of the force arising from sticking is given. At the same time, the working hypothesis takes a view of the combined effect of adhesion and friction interactions as the reasons that cause this phenomenon. As a measure to control the occurrence of sticking and to reduce the resistance force to movement of the pipeline in the well, several methods of ballasting the working pipeline are proposed, depending on the profile of the well and the ratio of the length of the curved sections of the inlet and outlet and the straight horizontal sections of the profile. It is shown that for crossings, which profile contains an extended horizontal section, it is possible to partially fill the pipeline with water to achieve zero buoyancy, and for crossings with curvature along the entire profile, the ballasting efficiency will be minimal.

  16. Commissioning of a new helium pipeline

    NASA Technical Reports Server (NTRS)

    2000-01-01

    At the commissioning of a new high-pressure helium pipeline at Kennedy Space Center, participants cut the lines to helium-filled balloons. From left, they are Center Director Roy Bridges; Michael Butchko, president, SGS; Pierre Dufour, president and CEO, Air Liquide America Corporation; David Herst, director, Delta IV Launch Sites; Pamela Gillespie, executive administrator, office of Congressman Dave Weldon; and Col. Samuel Dick, representative of the 45th Space Wing. The nine-mile-long buried pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. It will also serve as a backup helium resource for Shuttle launches. Nearly one launch's worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS), and Ramon Lugo, acting executive director, JPMO.

  17. Commissioning of a new helium pipeline

    NASA Technical Reports Server (NTRS)

    2000-01-01

    At the commissioning of a new high-pressure helium pipeline at Kennedy Space Center, participants watch as helium-filled balloons take to the sky after their lines were cut. From left, they are Center Director Roy Bridges; Michael Butchko, president, SGS; Pierre Dufour, president and CEO, Air Liquide America Corporation; David Herst, director, Delta IV Launch Sites; Pamela Gillespie, executive administrator, office of Congressman Dave Weldon; and Col. Samuel Dick, representative of the 45th Space Wing. The nine-mile-long buried pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. It will also serve as a backup helium resource for Shuttle launches. Nearly one launch's worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS), and Ramon Lugo, acting executive director, JPMO.

  18. Mary, a Pipeline to Aid Discovery of Optical Transients

    NASA Astrophysics Data System (ADS)

    Andreoni, I.; Jacobs, C.; Hegarty, S.; Pritchard, T.; Cooke, J.; Ryder, S.

    2017-09-01

    The ability to quickly detect transient sources in optical images and trigger multi-wavelength follow up is key for the discovery of fast transients. These include events rare and difficult to detect such as kilonovae, supernova shock breakout, and `orphan' Gamma-ray Burst afterglows. We present the Mary pipeline, a (mostly) automated tool to discover transients during high-cadenced observations with the Dark Energy Camera at Cerro Tololo Inter-American Observatory (CTIO). The observations are part of the `Deeper Wider Faster' programme, a multi-facility, multi-wavelength programme designed to discover fast transients, including counterparts to Fast Radio Bursts and gravitational waves. Our tests of the Mary pipeline on Dark Energy Camera images return a false positive rate of 2.2% and a missed fraction of 3.4% obtained in less than 2 min, which proves the pipeline to be suitable for rapid and high-quality transient searches. The pipeline can be adapted to search for transients in data obtained with imagers other than Dark Energy Camera.

  19. Argentine gas system underway for Gas del Estado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bosch, H.

    Gas del Estado's giant 1074-mile Centro-Oeste pipeline project - designed to ultimately transport over 350 million CF/day of natural gas from the Neuquen basin to the Campo Duran-Buenos Aires pipeline system - is now underway. The COGASCO consortium of Dutch and Argentine companies awarded the construction project will also operate and maintain the system for 15 years after its completion. In addition to the 30-in. pipelines, the agreement calls for a major compressor station at the gas field, three intermediate compressor stations, a gas-treatment plant, liquids-recovery facilities, and the metering, control, communications, and maintenance equipment for the system. Fabricated inmore » Holland, the internally and externally coated pipe will be double-jointed to 80-ft lengths after shipment to Argentina; welders will use conventional manual-arc techniques to weld the pipeline in the field.« less

  20. 75 FR 45111 - Kinder Morgan Interstate Gas Transmission LLC; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... certain mainline pipeline and ancillary facilities primarily to serve a new ethanol plant in Adams County... develop firm transportation to serve ethanol production facilities in the Midwest, KMIGT held an open... gas to serve its new ethanol plant located near Aurora, Nebraska. Accordingly, KMIGT proposes to...

  1. 78 FR 68052 - Town of Telluride, Colorado; Notice of Preliminary Determination of a Qualifying Conduit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ...--Criteria for Qualifying Conduit Hydropower Facility Satisfies (Y/ Statutory provision Description N) FPA 30(a)(3)(A), as amended by The conduit the Y HREA. facility uses is a tunnel, canal, pipeline, aqueduct... agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. FPA 30...

  2. 77 FR 37036 - Williston Basin Interstate Pipeline Company; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... operation of natural gas facilities in Sheridan County and Campbell County, Wyoming and modification of underground storage facilities at its Baker Storage Reservoir in Fallon County, Montana. The details of... firm storage deliverability from its Baker Storage Reservoir that it will use to make up for declining...

  3. Numerical Simulation of Pipeline Deformation Caused by Rockfall Impact

    PubMed Central

    Liang, Zheng; Han, Chuanjun

    2014-01-01

    Rockfall impact is one of the fatal hazards in pipeline transportation of oil and gas. The deformation of oil and gas pipeline caused by rockfall impact was investigated using the finite element method in this paper. Pipeline deformations under radial impact, longitudinal inclined impact, transverse inclined impact, and lateral eccentric impact of spherical and cube rockfalls were discussed, respectively. The effects of impact angle and eccentricity on the plastic strain of pipeline were analyzed. The results show that the crater depth on pipeline caused by spherical rockfall impact is deeper than by cube rockfall impact with the same volume. In the inclined impact condition, the maximum plastic strain of crater caused by spherical rockfall impact appears when incidence angle α is 45°. The pipeline is prone to rupture under the cube rockfall impact when α is small. The plastic strain distribution of impact crater is more uneven with the increasing of impact angle. In the eccentric impact condition, plastic strain zone of pipeline decreases with the increasing of eccentricity k. PMID:24959599

  4. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-04-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of municipal solid waste (MSW) feed material was procured. During this quarter (first quarter of 2001), shredding of the feed material was completedmore » and final feed conditioning was completed. Pilot facility hydrolysis production was completed to produce lignin for co-fire testing. Pilot facility modifications continued to improve facility operations and performance during the first quarter of 2001. Samples of the co-fire fuel material were sent to the co-fire facility for evaluation. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system is being developed.« less

  5. 49 CFR 193.2189-193.2233 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Design Lng Storage Tanks §§ 193.2189-193.2233 [Reserved] ...

  6. 49 CFR 193.2167 - Covered systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... impounding system is prohibited except for concrete wall designed tanks where the concrete wall is an outer...

  7. 49 CFR 193.2121-193.2153 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Design Design of Components and Buildings §§ 193.2121-193...

  8. Quantum-assisted biomolecular modelling.

    PubMed

    Harris, Sarah A; Kendon, Vivien M

    2010-08-13

    Our understanding of the physics of biological molecules, such as proteins and DNA, is limited because the approximations we usually apply to model inert materials are not, in general, applicable to soft, chemically inhomogeneous systems. The configurational complexity of biomolecules means the entropic contribution to the free energy is a significant factor in their behaviour, requiring detailed dynamical calculations to fully evaluate. Computer simulations capable of taking all interatomic interactions into account are therefore vital. However, even with the best current supercomputing facilities, we are unable to capture enough of the most interesting aspects of their behaviour to properly understand how they work. This limits our ability to design new molecules, to treat diseases, for example. Progress in biomolecular simulation depends crucially on increasing the computing power available. Faster classical computers are in the pipeline, but these provide only incremental improvements. Quantum computing offers the possibility of performing huge numbers of calculations in parallel, when it becomes available. We discuss the current open questions in biomolecular simulation, how these might be addressed using quantum computation and speculate on the future importance of quantum-assisted biomolecular modelling.

  9. Corrosivity Sensor for Exposed Pipelines Based on Wireless Energy Transfer.

    PubMed

    Lawand, Lydia; Shiryayev, Oleg; Al Handawi, Khalil; Vahdati, Nader; Rostron, Paul

    2017-05-30

    External corrosion was identified as one of the main causes of pipeline failures worldwide. A solution that addresses the issue of detecting and quantifying corrosivity of environment for application to existing exposed pipelines has been developed. It consists of a sensing array made of an assembly of thin strips of pipeline steel and a circuit that provides a visual sensor reading to the operator. The proposed sensor is passive and does not require a constant power supply. Circuit design was validated through simulations and lab experiments. Accelerated corrosion experiment was conducted to confirm the feasibility of the proposed corrosivity sensor design.

  10. Modelling water hammer in viscoelastic pipelines: short brief

    NASA Astrophysics Data System (ADS)

    Urbanowicz, K.; Firkowski, M.; Zarzycki, Z.

    2016-10-01

    The model of water hammer in viscoelastic pipelines is analyzed. An appropriate mathematical model of water hammer in polymer pipelines is presented. An additional term has been added to continuity equation to describe the retarded deformation of the pipe wall. The mechanical behavior of viscoelastic material is described by generalized Kelvin-Voigt model. The comparison of numerical simulation and experimental data from well known papers is presented. Short discussion about obtained results are given.

  11. Cathodic protection - Coating and river profile survey of a 20 year old remote onshore crude pipeline

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simon, P.

    1984-02-01

    This paper presents test data, evaluation and recommendations resulting from an investigative cathodic protection and coating integrity survey of a twenty year old, onshore crude oil pipeline. The pipeline discussed is 20 inches (508 mm) in diameter, 233 kilometers long and originates at a pumping facility in an inland oil field. The pipeline runs through mountainous terrain, low lying marshland and terminates at a twin 16 inch submarine crossing. The pipeline is located in Southern Kalimantan, Indonesia and is part of the Pertamina Unit IV installation. The field testing was performed by Norton Corrosion Limited (NCL) during the months ofmore » March and April, 1983 and was done concurrently with river crossing profile work by Sterling Energy and Resource Technologies, Limited. The purpose of the survey was to determine the condition of the pipeline and the condition and effectiveness of existing corrosion control measures. The pipeline had experienced an increasing number of leaks in recent years and it was necessary to know the physical condition of the line and what could be done to extend its useful life. The present and future integrity of the pipeline was critical to the clients' planning in that this particular line is the only onshore connection between the field and new refinery which was nearing completion.« less

  12. Structural health monitoring of pipelines rehabilitated with lining technology

    NASA Astrophysics Data System (ADS)

    Farhidzadeh, Alireza; Dehghan-Niri, Ehsan; Salamone, Salvatore

    2014-03-01

    Damage detection of pipeline systems is a tedious and time consuming job due to digging requirement, accessibility, interference with other facilities, and being extremely wide spread in metropolitans. Therefore, a real-time and automated monitoring system can pervasively reduce labor work, time, and expenditures. This paper presents the results of an experimental study aimed at monitoring the performance of full scale pipe lining systems, subjected to static and dynamic (seismic) loading, using Acoustic Emission (AE) technique and Guided Ultrasonic Waves (GUWs). Particularly, two damage mechanisms are investigated: 1) delamination between pipeline and liner as the early indicator of damage, and 2) onset of nonlinearity and incipient failure of the liner as critical damage state.

  13. Automatic Generalizability Method of Urban Drainage Pipe Network Considering Multi-Features

    NASA Astrophysics Data System (ADS)

    Zhu, S.; Yang, Q.; Shao, J.

    2018-05-01

    Urban drainage systems are indispensable dataset for storm-flooding simulation. Given data availability and current computing power, the structure and complexity of urban drainage systems require to be simplify. However, till data, the simplify procedure mainly depend on manual operation that always leads to mistakes and lower work efficiency. This work referenced the classification methodology of road system, and proposed a conception of pipeline stroke. Further, length of pipeline, angle between two pipelines, the pipeline belonged road level and diameter of pipeline were chosen as the similarity criterion to generate the pipeline stroke. Finally, designed the automatic method to generalize drainage systems with the concern of multi-features. This technique can improve the efficiency and accuracy of the generalization of drainage systems. In addition, it is beneficial to the study of urban storm-floods.

  14. 49 CFR 193.2511 - Personnel safety.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... building or yard, where they could be harmed by thermal radiation from a burning pool of impounded liquid...

  15. Gathering pipeline methane emissions in Fayetteville shale pipelines and scoping guidelines for future pipeline measurement campaigns

    DOE PAGES

    Zimmerle, Daniel J.; Pickering, Cody K.; Bell, Clay S.; ...

    2017-11-24

    Gathering pipelines, which transport gas from well pads to downstream processing, are a sector of the natural gas supply chain for which little measured methane emissions data are available. This study performed leak detection and measurement on 96 km of gathering pipeline and the associated 56 pigging facilities and 39 block valves. The study found one underground leak accounting for 83% (4.0 kg CH 4/hr) of total measured emissions. Methane emissions for the 4684 km of gathering pipeline in the study area were estimated at 402 kg CH 4/hr [95 to 1065 kg CH 4/hr, 95% CI], or 1% [0.2%more » to 2.6%] of all methane emissions measured during a prior aircraft study of the same area. Emissions estimated by this study fall within the uncertainty range of emissions estimated using emission factors from EPA's 2015 Greenhouse Inventory and study activity estimates. While EPA's current inventory is based upon emission factors from distribution mains measured in the 1990s, this study indicates that using emission factors from more recent distribution studies could significantly underestimate emissions from gathering pipelines. To guide broader studies of pipeline emissions, we also estimate the fraction of the pipeline length within a basin that must be measured to constrain uncertainty of pipeline emissions estimates to within 1% of total basin emissions. The study provides both substantial insight into the mix of emission sources and guidance for future gathering pipeline studies, but since measurements were made in a single basin, the results are not sufficiently representative to provide methane emission factors at the regional or national level.« less

  16. Gathering pipeline methane emissions in Fayetteville shale pipelines and scoping guidelines for future pipeline measurement campaigns

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimmerle, Daniel J.; Pickering, Cody K.; Bell, Clay S.

    Gathering pipelines, which transport gas from well pads to downstream processing, are a sector of the natural gas supply chain for which little measured methane emissions data are available. This study performed leak detection and measurement on 96 km of gathering pipeline and the associated 56 pigging facilities and 39 block valves. The study found one underground leak accounting for 83% (4.0 kg CH 4/hr) of total measured emissions. Methane emissions for the 4684 km of gathering pipeline in the study area were estimated at 402 kg CH 4/hr [95 to 1065 kg CH 4/hr, 95% CI], or 1% [0.2%more » to 2.6%] of all methane emissions measured during a prior aircraft study of the same area. Emissions estimated by this study fall within the uncertainty range of emissions estimated using emission factors from EPA's 2015 Greenhouse Inventory and study activity estimates. While EPA's current inventory is based upon emission factors from distribution mains measured in the 1990s, this study indicates that using emission factors from more recent distribution studies could significantly underestimate emissions from gathering pipelines. To guide broader studies of pipeline emissions, we also estimate the fraction of the pipeline length within a basin that must be measured to constrain uncertainty of pipeline emissions estimates to within 1% of total basin emissions. The study provides both substantial insight into the mix of emission sources and guidance for future gathering pipeline studies, but since measurements were made in a single basin, the results are not sufficiently representative to provide methane emission factors at the regional or national level.« less

  17. Extraction of global 21-cm signal from simulated data for the Dark Ages Radio Explorer (DARE) using an MCMC pipeline

    NASA Astrophysics Data System (ADS)

    Tauscher, Keith A.; Burns, Jack O.; Rapetti, David; Mirocha, Jordan; Monsalve, Raul A.

    2017-01-01

    The Dark Ages Radio Explorer (DARE) is a mission concept proposed to NASA in which a crossed dipole antenna collects low frequency (40-120 MHz) radio measurements above the farside of the Moon to detect and characterize the global 21-cm signal from the early (z~35-11) Universe's neutral hydrogen. Simulated data for DARE includes: 1) the global signal modeled using the ares code, 2) spectrally smooth Galactic foregrounds with spatial structure taken from multiple radio foreground maps averaged over a large, well characterized beam, 3) systematics introduced in the data by antenna/receiver reflections, and 4) the Moon. This simulated data is fed into a signal extraction pipeline. As the signal is 4-5 orders of magnitude below the Galactic synchrotron contribution, it is best extracted from the data using Bayesian techniques which take full advantage of prior knowledge of the instrument and foregrounds. For the DARE pipeline, we use the affine-invariant MCMC algorithm implemented in the Python package, emcee. The pipeline also employs singular value decomposition to use known spectral features of the antenna and receiver to form a natural basis with which to fit instrumental systematics. Taking advantage of high-fidelity measurements of the antenna beam (to ~20 ppm) and precise calibration of the instrument, the pipeline extracts the global 21-cm signal with an average RMS error of 10-15 mK for multiple signal models.

  18. Solvepol: A Reduction Pipeline for Imaging Polarimetry Data

    NASA Astrophysics Data System (ADS)

    Ramírez, Edgar A.; Magalhães, Antônio M.; Davidson, James W., Jr.; Pereyra, Antonio; Rubinho, Marcelo

    2017-05-01

    We present a newly, fully automated, data pipeline, Solvepol, designed to reduce and analyze polarimetric data. It has been optimized for imaging data from the Instituto de Astronomía, Geofísica e Ciências Atmosféricas (IAG) of the University of São Paulo (USP), calcite Savart prism plate-based IAGPOL polarimeter. Solvepol is also the basis of a reduction pipeline for the wide-field optical polarimeter that will execute SOUTH POL, a survey of the polarized southern sky. Solvepol was written using the Interactive data language (IDL) and is based on the Image Reduction and Analysis Facility (IRAF) task PCCDPACK, developed by our polarimetry group. We present and discuss reduced data from standard stars and other fields and compare these results with those obtained in the IRAF environment. Our analysis shows that Solvepol, in addition to being a fully automated pipeline, produces results consistent with those reduced by PCCDPACK and reported in the literature.

  19. KSC00padig072

    NASA Image and Video Library

    2000-11-02

    Center Director Roy Bridges addresses the audience at the commissioning of a new high-pressure helium pipeline at Kennedy Space Center that will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. The nine-mile-long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS); Col. Samuel Dick, representative of the 45th Space Wing; Ramon Lugo, acting executive director, JPMO; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS

  20. KSC-00padig072

    NASA Image and Video Library

    2000-11-02

    Center Director Roy Bridges addresses the audience at the commissioning of a new high-pressure helium pipeline at Kennedy Space Center that will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. The nine-mile-long buried pipeline will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS); Col. Samuel Dick, representative of the 45th Space Wing; Ramon Lugo, acting executive director, JPMO; David Herst, director, Delta IV Launch Sites; Pierre Dufour, president and CEO, Air Liquide America Corporation; and Michael Butchko, president, SGS

  1. Gas network model allows full reservoir coupling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Methnani, M.M.

    The gas-network flow model (Gasnet) developed for and added to an existing Qatar General Petroleum Corp. (OGPC) in-house reservoir simulator, allows improved modeling of the interaction among the reservoir, wells, and pipeline networks. Gasnet is a three-phase model that is modified to handle gas-condensate systems. The numerical solution is based on a control volume scheme that uses the concept of cells and junctions, whereby pressure and phase densities are defined in cells, while phase flows are defined at junction links. The model features common numerical equations for the reservoir, the well, and the pipeline components and an efficient state-variable solutionmore » method in which all primary variables including phase flows are solved directly. Both steady-state and transient flow events can be simulated with the same tool. Three test cases show how the model runs. One case simulates flow redistribution in a simple two-branch gas network. The second simulates a horizontal gas well in a waterflooded gas reservoir. The third involves an export gas pipeline coupled to a producing reservoir.« less

  2. 78 FR 29201 - Notice of Availability of Finding of No Significant Impact for the Proposed Vantage Pipeline US...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ... maintenance at the borders of the United States, of facilities for the exportation or importation of liquid... installation of associated aboveground mainline block valves; and the use of access roads and pipe storage and... Permit authorizing the construction, connection, operation, and maintenance of the Cross Border Facility...

  3. 78 FR 69662 - Browns Valley Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... facility is constructed, operated, or maintained Y for the generation of electric power and uses for such... Statutory provision Description (Y/N) FPA 30(a)(3)(A), as amended by HREA....... The conduit the facility uses is a tunnel, canal, Y pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that...

  4. 78 FR 69847 - North Side Canal Company; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ...--Criteria for Qualifying Conduit Hydropower Facility Satisfies (Y/ Statutory provision Description N) FPA 30(a)(3)(A), as amended by The conduit the Y HREA. facility uses is a tunnel, canal, pipeline, aqueduct... agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. FPA 30...

  5. 77 FR 67056 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... transport natural gas liquids (``NGLs'') extending from a block valve site in St. Clair County, Michigan... Storage LLC., by FERC. Because NOVA intends to place Line 20 facilities back into natural gas liquids... gas liquids would be in the U.S. national interest. DATES: Interested parties are invited to submit...

  6. Accidental hazardous material releases with human impacts in the United States: exploration of geographical distribution and temporal trends.

    PubMed

    Sengul, Hatice; Santella, Nicholas; Steinberg, Laura J; Chermak, Christina

    2010-09-01

    To investigate the circumstances and geographic and temporal distributions of hazardous material releases and resulting human impacts in the United States. Releases with fatalities, injuries, and evacuations were identified from reports to the National Response Center between 1990 and 2008, correcting for data quality issues identified in previous studies. From more than 550,000 reports, 861 deaths, 16,348 injuries and 741,427 evacuations were identified. Injuries from releases of chemicals at fixed facilities and natural gas from pipelines have decreased whereas evacuations from petroleum releases at fixed facilities have increased. Results confirm recent advances in chemical and pipeline safety and suggest directions for further improvement including targeted training and inspections and adoption of inherently safer design principles.

  7. The Gemini NICI Planet-Finding Campaign: The Companion Detection Pipeline

    NASA Astrophysics Data System (ADS)

    Wahhaj, Zahed; Liu, Michael C.; Biller, Beth A.; Nielsen, Eric L.; Close, Laird M.; Hayward, Thomas L.; Hartung, Markus; Chun, Mark; Ftaclas, Christ; Toomey, Douglas W.

    2013-12-01

    We present high-contrast image processing techniques used by the Gemini NICI Planet-Finding Campaign to detect faint companions to bright stars. The Near-Infrared Coronographic Imager (NICI) is an adaptive optics instrument installed on the 8 m Gemini South telescope, capable of angular and spectral difference imaging and specifically designed to image exoplanets. The Campaign data pipeline achieves median contrasts of 12.6 mag at 0.''5 and 14.4 mag at 1'' separation, for a sample of 45 stars (V = 4.3-13.9 mag) from the early phase of the campaign. We also present a novel approach to calculating contrast curves for companion detection based on 95% completeness in the recovery of artificial companions injected into the raw data, while accounting for the false-positive rate. We use this technique to select the image processing algorithms that are more successful at recovering faint simulated point sources. We compare our pipeline to the performance of the Locally Optimized Combination of Images (LOCI) algorithm for NICI data and do not find significant improvement with LOCI. Based on observations obtained at the Gemini Observatory, which is operated by the Association of Universities for Research in Astronomy, Inc., under a cooperative agreement with the NSF on behalf of the Gemini partnership: the National Science Foundation (United States), the Science and Technology Facilities Council (United Kingdom), the National Research Council (Canada), CONICYT (Chile), the Australian Research Council (Australia), Ministério da Ciência e Tecnologia (Brazil) and Ministerio de Ciencia, Tecnología e Innovación Productiva (Argentina).

  8. 76 FR 54767 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ..., WA, Whistling Ridge Energy Project, Construction and Operation of a 75-megawatt (MW) Wind Turbine... Proposed Construction, Connection, Operation, and Maintenance of a Pipeline and Associated Facilities at...

  9. Experimental and Numerical Investigation of Local Scour Around Submarine Piggyback Pipeline Under Steady Current

    NASA Astrophysics Data System (ADS)

    Zhao, Enjin; Shi, Bing; Qu, Ke; Dong, Wenbin; Zhang, Jing

    2018-04-01

    As a new type of submarine pipeline, the piggyback pipeline has been gradually adopted in engineering practice to enhance the performance and safety of submarine pipelines. However, limited simulation work and few experimental studies have been published on the scour around the piggyback pipeline under steady current. This study numerically and experimentally investigates the local scour of the piggyback pipe under steady current. The influence of prominent factors such as pipe diameter, inflow Reynolds number, and gap between the main and small pipes, on the maximum scour depth have been examined and discussed in detail. Furthermore, one formula to predict the maximum scour depth under the piggyback pipeline has been derived based on the theoretical analysis of scour equilibrium. The feasibility of the proposed formula has been effectively calibrated by both experimental data and numerical results. The findings drawn from this study are instructive in the future design and application of the piggyback pipeline.

  10. Montubi completes mile-long liquid ethylene pipeline project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-12-01

    Montubi has completed the mile-long liquid ethylene pipeline project for Solvay S.p.A. at Vada, Italy, a line that extends 3.4 mi from an offshore unloading dock to an onshore gasification facility for Solvay's chemical plant at Rosignano. The 18 mo project included a mile-long 1750 ton jetty; one eight-leg main unloading platform; eight mooring dolphins plus four breasting dolphins; one small platform for firefighting pump units; and a concrete service road along the jetty.

  11. Tsunami Early Warning via a Physics-Based Simulation Pipeline

    NASA Astrophysics Data System (ADS)

    Wilson, J. M.; Rundle, J. B.; Donnellan, A.; Ward, S. N.; Komjathy, A.

    2017-12-01

    Through independent efforts, physics-based simulations of earthquakes, tsunamis, and atmospheric signatures of these phenomenon have been developed. With the goal of producing tsunami forecasts and early warning tools for at-risk regions, we join these three spheres to create a simulation pipeline. The Virtual Quake simulator can produce thousands of years of synthetic seismicity on large, complex fault geometries, as well as the expected surface displacement in tsunamigenic regions. These displacements are used as initial conditions for tsunami simulators, such as Tsunami Squares, to produce catalogs of potential tsunami scenarios with probabilities. Finally, these tsunami scenarios can act as input for simulations of associated ionospheric total electron content, signals which can be detected by GNSS satellites for purposes of early warning in the event of a real tsunami. We present the most recent developments in this project.

  12. CROSS-DISCIPLINARY PHYSICS AND RELATED AREAS OF SCIENCE AND TECHNOLOGY: Depletion interactions in a cylindric pipeline

    NASA Astrophysics Data System (ADS)

    Huang, Li-Xin; Gao, Hai-Xia; Li, Chun-Shu; Xiao, Chang-Ming

    2009-08-01

    In a colloidal system confined by a small cylindric pipeline, the depletion interaction between two large spheres is different to the system confined by two plates, and the influence on depletion interaction from the pipeline is related to both the size and shape of it. In this paper, the depletion interactions in the systems confined by pipelines of different sizes or different shapes are studied by Monte Carlo simulations. The numerical results show that the influence on depletion force from the cylindric pipeline is stronger than that from two parallel plates, and the depletion force will be strengthened when the diameter of the cylinder is decreased. In addition, we also find that the depletion interaction is rather affected if the shape change of the pipeline is slightly changed, and the influence on depletion force from the shape change is stronger than that from the size change.

  13. A Pipeline for Constructing a Catalog of Multi-method Models of Interacting Galaxies

    NASA Astrophysics Data System (ADS)

    Holincheck, Anthony

    Galaxies represent a fundamental unit of matter for describing the large-scale structure of the universe. One of the major processes affecting the formation and evolution of galaxies are mutual interactions. These interactions can including gravitational tidal distortion, mass transfer, and even mergers. In any hierarchical model, mergers are the key mechanism in galaxy formation and evolution. Computer simulations of interacting galaxies have evolved in the last four decades from simple restricted three-body algorithms to full n-body gravity models. These codes often included sophisticated physical mechanisms such as gas dynamics, supernova feedback, and central blackholes. As the level of complexity, and perhaps realism, increases so does the amount of computational resources needed. These advanced simulations are often used in parameter studies of interactions. They are usually only employed in an ad hoc fashion to recreate the dynamical history of specific sets of interacting galaxies. These specific models are often created with only a few dozen or at most few hundred sets of simulation parameters being attempted. This dissertation presents a prototype pipeline for modeling specific pairs of interacting galaxies in bulk. The process begins with a simple image of the current disturbed morphology and an estimate of distance to the system and mass of the galaxies. With the use of an updated restricted three-body simulation code and the help of Citizen Scientists, the pipeline is able to sample hundreds of thousands of points in parameter space for each system. Through the use of a convenient interface and innovative scoring algorithm, the pipeline aids researchers in identifying the best set of simulation parameters. This dissertation demonstrates a successful recreation of the disturbed morphologies of 62 pairs of interacting galaxies. The pipeline also provides for examining the level of convergence and uniqueness of the dynamical properties of each system. By creating a population of models for actual systems, the current research is able to compare simulation-based and observational values on a larger scale than previous efforts. Several potential relationships between star formation rate and dynamical time since closest approach are presented.

  14. Welding Thermal Simulation and Corrosion Study of X-70 Deep Sea Pipeline Steel

    NASA Astrophysics Data System (ADS)

    Zhang, Weipeng; Li, Zhuoran; Gao, Jixiang; Peng, Zhengwu

    2017-12-01

    Gleeble thermomechanical processing machine was used to simulate coarse grain heat affected zone (CGHAZ) of API X-70 thick wall pipeline steel used in deep sea. Microstructures and corresponding corrosion behavior of the simulated CGHAZs using different cooling rate were investigated and compared to the as-received material by scanning electron microscope and electrochemical experiments carried out in 3.5 wt. % NaCl solution. Results of this study show that the as-received samples exhibited a little bit higher corrosion resistance than the simulated CGHAZs. Among 3 sets of simulation experiments, the maximum corrosion tendency was exhibited at the t8/5 = 20 s with the most martensite-austensite (M-A) microstructure and highest corrosion potential was shown at the t8/5 = 60 s.

  15. Corrosivity Sensor for Exposed Pipelines Based on Wireless Energy Transfer

    PubMed Central

    Lawand, Lydia; Shiryayev, Oleg; Al Handawi, Khalil; Vahdati, Nader; Rostron, Paul

    2017-01-01

    External corrosion was identified as one of the main causes of pipeline failures worldwide. A solution that addresses the issue of detecting and quantifying corrosivity of environment for application to existing exposed pipelines has been developed. It consists of a sensing array made of an assembly of thin strips of pipeline steel and a circuit that provides a visual sensor reading to the operator. The proposed sensor is passive and does not require a constant power supply. Circuit design was validated through simulations and lab experiments. Accelerated corrosion experiment was conducted to confirm the feasibility of the proposed corrosivity sensor design. PMID:28556805

  16. INTERNAL REPAIR OF PIPELINES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robin Gordon; Bill Bruce; Nancy Porter

    2003-05-01

    The two broad categories of deposited weld metal repair and fiber-reinforced composite repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repairs and for fiber-reinforced composite repair. To date, all of the experimental work pertaining to the evaluation of potential repair methods has focused on fiber-reinforced composite repairs. Hydrostatic testing was also conducted on four pipeline sections with simulated corrosion damage: twomore » with composite liners and two without.« less

  17. 49 CFR 193.2183-193.2185 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Design Impoundment Design and Capacity §§ 193.2183-193.2185 [Reserved] LNG Storage Tanks ...

  18. 75 FR 77862 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... RM10-25-000......... Five-Year Review of Oil Pipeline Pricing Index. G-2 RM11-4-000 Storage Reporting............ Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection...

  19. 33 CFR 154.1110 - Purpose and applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility Operating in Prince William Sound... performance standards. (b) The information required by this subpart must be included in the Prince William...

  20. AP-IO: asynchronous pipeline I/O for hiding periodic output cost in CFD simulation.

    PubMed

    Xiaoguang, Ren; Xinhai, Xu

    2014-01-01

    Computational fluid dynamics (CFD) simulation often needs to periodically output intermediate results to files in the form of snapshots for visualization or restart, which seriously impacts the performance. In this paper, we present asynchronous pipeline I/O (AP-IO) optimization scheme for the periodically snapshot output on the basis of asynchronous I/O and CFD application characteristics. In AP-IO, dedicated background I/O processes or threads are in charge of handling the file write in pipeline mode, therefore the write overhead can be hidden with more calculation than classic asynchronous I/O. We design the framework of AP-IO and implement it in OpenFOAM, providing CFD users with a user-friendly interface. Experimental results on the Tianhe-2 supercomputer demonstrate that AP-IO can achieve a good optimization effect for the periodical snapshot output in CFD application, and the effect is especially better for massively parallel CFD simulations, which can reduce the total execution time up to about 40%.

  1. AP-IO: Asynchronous Pipeline I/O for Hiding Periodic Output Cost in CFD Simulation

    PubMed Central

    Xiaoguang, Ren; Xinhai, Xu

    2014-01-01

    Computational fluid dynamics (CFD) simulation often needs to periodically output intermediate results to files in the form of snapshots for visualization or restart, which seriously impacts the performance. In this paper, we present asynchronous pipeline I/O (AP-IO) optimization scheme for the periodically snapshot output on the basis of asynchronous I/O and CFD application characteristics. In AP-IO, dedicated background I/O processes or threads are in charge of handling the file write in pipeline mode, therefore the write overhead can be hidden with more calculation than classic asynchronous I/O. We design the framework of AP-IO and implement it in OpenFOAM, providing CFD users with a user-friendly interface. Experimental results on the Tianhe-2 supercomputer demonstrate that AP-IO can achieve a good optimization effect for the periodical snapshot output in CFD application, and the effect is especially better for massively parallel CFD simulations, which can reduce the total execution time up to about 40%. PMID:24955390

  2. Automatising the analysis of stochastic biochemical time-series

    PubMed Central

    2015-01-01

    Background Mathematical and computational modelling of biochemical systems has seen a lot of effort devoted to the definition and implementation of high-performance mechanistic simulation frameworks. Within these frameworks it is possible to analyse complex models under a variety of configurations, eventually selecting the best setting of, e.g., parameters for a target system. Motivation This operational pipeline relies on the ability to interpret the predictions of a model, often represented as simulation time-series. Thus, an efficient data analysis pipeline is crucial to automatise time-series analyses, bearing in mind that errors in this phase might mislead the modeller's conclusions. Results For this reason we have developed an intuitive framework-independent Python tool to automate analyses common to a variety of modelling approaches. These include assessment of useful non-trivial statistics for simulation ensembles, e.g., estimation of master equations. Intuitive and domain-independent batch scripts will allow the researcher to automatically prepare reports, thus speeding up the usual model-definition, testing and refinement pipeline. PMID:26051821

  3. WTP Pretreatment Facility Potential Design Deficiencies--Sliding Bed and Sliding Bed Erosion Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, E. K.

    2015-05-06

    This assessment is based on readily available literature and discusses both Newtonian and non-Newtonian slurries with respect to sliding beds and erosion due to sliding beds. This report does not quantify the size of the sliding beds or erosion rates due to sliding beds, but only assesses if they could be present. This assessment addresses process pipelines in the Pretreatment (PT) facility and the high level waste (HLW) transfer lines leaving the PT facility to the HLW vitrification facility concentrate receipt vessel.

  4. VASA: Interactive Computational Steering of Large Asynchronous Simulation Pipelines for Societal Infrastructure.

    PubMed

    Ko, Sungahn; Zhao, Jieqiong; Xia, Jing; Afzal, Shehzad; Wang, Xiaoyu; Abram, Greg; Elmqvist, Niklas; Kne, Len; Van Riper, David; Gaither, Kelly; Kennedy, Shaun; Tolone, William; Ribarsky, William; Ebert, David S

    2014-12-01

    We present VASA, a visual analytics platform consisting of a desktop application, a component model, and a suite of distributed simulation components for modeling the impact of societal threats such as weather, food contamination, and traffic on critical infrastructure such as supply chains, road networks, and power grids. Each component encapsulates a high-fidelity simulation model that together form an asynchronous simulation pipeline: a system of systems of individual simulations with a common data and parameter exchange format. At the heart of VASA is the Workbench, a visual analytics application providing three distinct features: (1) low-fidelity approximations of the distributed simulation components using local simulation proxies to enable analysts to interactively configure a simulation run; (2) computational steering mechanisms to manage the execution of individual simulation components; and (3) spatiotemporal and interactive methods to explore the combined results of a simulation run. We showcase the utility of the platform using examples involving supply chains during a hurricane as well as food contamination in a fast food restaurant chain.

  5. 15 CFR 930.39 - Content of a consistency determination.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... and construction of access road, connecting pipeline, support buildings, and the effects of the associated facilities (e.g., erosion, wetlands, beach access impacts), must all be consistent to the maximum...

  6. 30 CFR 285.816 - What must I do if environmental or other conditions adversely affect a cable, pipeline, or facility?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Environmental Effects § 285.816 What must I do if environmental or other conditions adversely affect a cable... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What must I do if environmental or other... EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Environmental and Safety Management, Inspections, and...

  7. Numerical Modeling of Mechanical Behavior for Buried Steel Pipelines Crossing Subsidence Strata

    PubMed Central

    Han, C. J.

    2015-01-01

    This paper addresses the mechanical behavior of buried steel pipeline crossing subsidence strata. The investigation is based on numerical simulation of the nonlinear response of the pipeline-soil system through finite element method, considering large strain and displacement, inelastic material behavior of buried pipeline and the surrounding soil, as well as contact and friction on the pipeline-soil interface. Effects of key parameters on the mechanical behavior of buried pipeline were investigated, such as strata subsidence, diameter-thickness ratio, buried depth, internal pressure, friction coefficient and soil properties. The results show that the maximum strain appears on the outer transition subsidence section of the pipeline, and its cross section is concave shaped. With the increasing of strata subsidence and diameter-thickness ratio, the out of roundness, longitudinal strain and equivalent plastic strain increase gradually. With the buried depth increasing, the deflection, out of roundness and strain of the pipeline decrease. Internal pressure and friction coefficient have little effect on the deflection of buried pipeline. Out of roundness is reduced and the strain is increased gradually with the increasing of internal pressure. The physical properties of soil have a great influence on the mechanical properties of buried pipeline. The results from the present study can be used for the development of optimization design and preventive maintenance for buried steel pipelines. PMID:26103460

  8. Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA,more » DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.« less

  9. California Earthquake Residual Transportation Capability Study

    DOT National Transportation Integrated Search

    1983-12-01

    This report addresses the ability of transportation facilities in California to survive four postulated earthquakes that are based on historical events. The survival of highways, railroads, ports, airports, and pipelines is investigated following ind...

  10. Numerical research on the lateral global buckling characteristics of a high temperature and pressure pipeline with two initial imperfections

    PubMed Central

    Liu, Wenbin; Liu, Aimin

    2018-01-01

    With the exploitation of offshore oil and gas gradually moving to deep water, higher temperature differences and pressure differences are applied to the pipeline system, making the global buckling of the pipeline more serious. For unburied deep-water pipelines, the lateral buckling is the major buckling form. The initial imperfections widely exist in the pipeline system due to manufacture defects or the influence of uneven seabed, and the distribution and geometry features of initial imperfections are random. They can be divided into two kinds based on shape: single-arch imperfections and double-arch imperfections. This paper analyzed the global buckling process of a pipeline with 2 initial imperfections by using a numerical simulation method and revealed how the ratio of the initial imperfection’s space length to the imperfection’s wavelength and the combination of imperfections affects the buckling process. The results show that a pipeline with 2 initial imperfections may suffer the superposition of global buckling. The growth ratios of buckling displacement, axial force and bending moment in the superposition zone are several times larger than no buckling superposition pipeline. The ratio of the initial imperfection’s space length to the imperfection’s wavelength decides whether a pipeline suffers buckling superposition. The potential failure point of pipeline exhibiting buckling superposition is as same as the no buckling superposition pipeline, but the failure risk of pipeline exhibiting buckling superposition is much higher. The shape and direction of two nearby imperfections also affects the failure risk of pipeline exhibiting global buckling superposition. The failure risk of pipeline with two double-arch imperfections is higher than pipeline with two single-arch imperfections. PMID:29554123

  11. The construction technology of Chinese ancient city drainage facilities

    NASA Astrophysics Data System (ADS)

    Hequn, Li; Yufengyun

    2018-03-01

    In ancient china, according to the local natural environment, a variety of drainage facilities were built in order to excrete rainwater, domestic sewage, production wastewater and so on. These drainage facilities were mainly made of pottery, bricks, wood, stone, etc. For example, ceramic water pipelines, buried in the ground, connect together one by one, and there was a slight drop from one end to the other in favor of drainage. These measures can also be used for reference in today’s urban drainage and flood control.

  12. Simulation-based comprehensive benchmarking of RNA-seq aligners

    PubMed Central

    Baruzzo, Giacomo; Hayer, Katharina E; Kim, Eun Ji; Di Camillo, Barbara; FitzGerald, Garret A; Grant, Gregory R

    2018-01-01

    Alignment is the first step in most RNA-seq analysis pipelines, and the accuracy of downstream analyses depends heavily on it. Unlike most steps in the pipeline, alignment is particularly amenable to benchmarking with simulated data. We performed a comprehensive benchmarking of 14 common splice-aware aligners for base, read, and exon junction-level accuracy and compared default with optimized parameters. We found that performance varied by genome complexity, and accuracy and popularity were poorly correlated. The most widely cited tool underperforms for most metrics, particularly when using default settings. PMID:27941783

  13. VizieR Online Data Catalog: Kepler pipeline transit signal recovery. III. (Christiansen+, 2016)

    NASA Astrophysics Data System (ADS)

    Christiansen, J. L.; Clarke, B. D.; Burke, C. J.; Jenkins, J. M.; Bryson, S. T.; Coughlin, J. L.; Mullally, F.; Thompson, S. E.; Twicken, J. D.; Batalha, N. M.; Haas, M. R.; Catanzarite, J.; Campbell, J. R.; Uddin, A. K.; Zamudio, K.; Smith, J. C.; Henze, C. E.

    2018-03-01

    Here we describe the third transit injection experiment, which tests the entire Kepler observing baseline (Q1-Q17) for the first time across all 84 CCD channels. It was performed to measure the sensitivity of the Kepler pipeline used to generate the Q1-Q17 Data Release 24 (DR24) catalog of Kepler Objects of Interest (Coughlin et al. 2016, J/ApJS/224/12) available at the NASA Exoplanet Archive (Akeson et al. 2013PASP..125..989A). The average detection efficiency describes the likelihood that the Kepler pipeline would successfully recover a given transit signal. To measure this property we perform a Monte Carlo experiment where we inject the signatures of simulated transiting planets around 198154 target stars, one per star, across the focal plane starting with the Q1-Q17 DR24 calibrated pixels. The simulated transits are generated using the Mandel & Agol (2002ApJ...580L.171M) model. Of the injections, 159013 resulted in three or more injected transits (the minimum required for detection by the pipeline) and were used for the subsequent analysis. (1 data file).

  14. TH-AB-207A-05: A Fully-Automated Pipeline for Generating CT Images Across a Range of Doses and Reconstruction Methods

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, S; Lo, P; Hoffman, J

    Purpose: To evaluate the robustness of CAD or Quantitative Imaging methods, they should be tested on a variety of cases and under a variety of image acquisition and reconstruction conditions that represent the heterogeneity encountered in clinical practice. The purpose of this work was to develop a fully-automated pipeline for generating CT images that represent a wide range of dose and reconstruction conditions. Methods: The pipeline consists of three main modules: reduced-dose simulation, image reconstruction, and quantitative analysis. The first two modules of the pipeline can be operated in a completely automated fashion, using configuration files and running the modulesmore » in a batch queue. The input to the pipeline is raw projection CT data; this data is used to simulate different levels of dose reduction using a previously-published algorithm. Filtered-backprojection reconstructions are then performed using FreeCT-wFBP, a freely-available reconstruction software for helical CT. We also added support for an in-house, model-based iterative reconstruction algorithm using iterative coordinate-descent optimization, which may be run in tandem with the more conventional recon methods. The reduced-dose simulations and image reconstructions are controlled automatically by a single script, and they can be run in parallel on our research cluster. The pipeline was tested on phantom and lung screening datasets from a clinical scanner (Definition AS, Siemens Healthcare). Results: The images generated from our test datasets appeared to represent a realistic range of acquisition and reconstruction conditions that we would expect to find clinically. The time to generate images was approximately 30 minutes per dose/reconstruction combination on a hybrid CPU/GPU architecture. Conclusion: The automated research pipeline promises to be a useful tool for either training or evaluating performance of quantitative imaging software such as classifiers and CAD algorithms across the range of acquisition and reconstruction parameters present in the clinical environment. Funding support: NIH U01 CA181156; Disclosures (McNitt-Gray): Institutional research agreement, Siemens Healthcare; Past recipient, research grant support, Siemens Healthcare; Consultant, Toshiba America Medical Systems; Consultant, Samsung Electronics.« less

  15. 75 FR 8318 - Agency Information Collection Activities: Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... and disposition of crude oil, petroleum products, and natural gas liquids. The data are published by..., blending plants, bulk terminals, crude oil and product pipelines, natural gas plant facilities, tankers...

  16. sTools - a data reduction pipeline for the GREGOR Fabry-Pérot Interferometer and the High-resolution Fast Imager at the GREGOR solar telescope

    NASA Astrophysics Data System (ADS)

    Kuckein, C.; Denker, C.; Verma, M.; Balthasar, H.; González Manrique, S. J.; Louis, R. E.; Diercke, A.

    2017-10-01

    A huge amount of data has been acquired with the GREGOR Fabry-Pérot Interferometer (GFPI), large-format facility cameras, and since 2016 with the High-resolution Fast Imager (HiFI). These data are processed in standardized procedures with the aim of providing science-ready data for the solar physics community. For this purpose, we have developed a user-friendly data reduction pipeline called ``sTools'' based on the Interactive Data Language (IDL) and licensed under creative commons license. The pipeline delivers reduced and image-reconstructed data with a minimum of user interaction. Furthermore, quick-look data are generated as well as a webpage with an overview of the observations and their statistics. All the processed data are stored online at the GREGOR GFPI and HiFI data archive of the Leibniz Institute for Astrophysics Potsdam (AIP). The principles of the pipeline are presented together with selected high-resolution spectral scans and images processed with sTools.

  17. KSC-00padig074

    NASA Image and Video Library

    2000-11-02

    At the commissioning of a new high-pressure helium pipeline at Kennedy Space Center, participants cut the lines to helium-filled balloons. From left, they are Center Director Roy Bridges; Michael Butchko, president, SGS; Pierre Dufour, president and CEO, Air Liquide America Corporation; David Herst, director, Delta IV Launch Sites; Pamela Gillespie, executive administrator, office of Congressman Dave Weldon; and Col. Samuel Dick, representative of the 45th Space Wing. The nine-mile-long buried pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. It will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS), and Ramon Lugo, acting executive director, JPMO

  18. KSC-00padig075

    NASA Image and Video Library

    2000-11-02

    At the commissioning of a new high-pressure helium pipeline at Kennedy Space Center, participants watch as helium-filled balloons take to the sky after their lines were cut. From left, they are Center Director Roy Bridges; Michael Butchko, president, SGS; Pierre Dufour, president and CEO, Air Liquide America Corporation; David Herst, director, Delta IV Launch Sites; Pamela Gillespie, executive administrator, office of Congressman Dave Weldon; and Col. Samuel Dick, representative of the 45th Space Wing. The nine-mile-long buried pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. It will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS), and Ramon Lugo, acting executive director, JPMO

  19. KSC00padig075

    NASA Image and Video Library

    2000-11-02

    At the commissioning of a new high-pressure helium pipeline at Kennedy Space Center, participants watch as helium-filled balloons take to the sky after their lines were cut. From left, they are Center Director Roy Bridges; Michael Butchko, president, SGS; Pierre Dufour, president and CEO, Air Liquide America Corporation; David Herst, director, Delta IV Launch Sites; Pamela Gillespie, executive administrator, office of Congressman Dave Weldon; and Col. Samuel Dick, representative of the 45th Space Wing. The nine-mile-long buried pipeline will service launch needs at the new Delta IV Complex 37 at Cape Canaveral Air Force Station. It will also serve as a backup helium resource for Shuttle launches. Nearly one launch’s worth of helium will be available in the pipeline to support a Shuttle pad in an emergency. The line originates at the Helium Facility on KSC and terminates in a meter station at the perimeter of the Delta IV launch pad. Others at the ceremony were Jerry Jorgensen, pipeline project manager, Space Gateway Support (SGS), and Ramon Lugo, acting executive director, JPMO

  20. World Bank oil-pipeline project designed to prevent HIV transmission.

    PubMed

    Kigotho, A W

    1997-11-29

    A World Bank-funded oil pipeline project, in Chad and Cameroon, is the first large-scale construction project in sub-Saharan Africa to incorporate an HIV/AIDS prevention component. The project entails the development of oil fields in southern Chad and construction of 1100 km of pipeline to port facilities on Cameroon's Atlantic coast. 3000 construction workers from the two countries will be employed between 1998 and 2001, including about 600 truck drivers. In some areas along the pipeline route, 50% of the prostitutes (who are frequented by truck drivers) are HIV-infected. The HIV/AIDS intervention aims to prevent HIV and sexually transmitted diseases (STDs) among project workers through social marketing of condoms, treatment of STDs in prostitutes along the route, and health education to modify high-risk behaviors. The program is considered a test case for African governments and donors interested in whether the integration of a health component in major construction projects can avoid AIDS epidemics in affected countries.

  1. Design and analysis of FBG based sensor for detection of damage in oil and gas pipelines for safety of marine life

    NASA Astrophysics Data System (ADS)

    Bedi, Amna; Kothari, Vaishali; Kumar, Santosh

    2018-02-01

    The under laid gas and oil pipelines on the seafloor are prone to various disturbances like seismic movements of the sea bed, oceanic currents, tsunamis. These factors tend to damage such pipelines connecting different locations of the world dependent on these pipelines for their day-to-day use of oil and natural gas. If damaged, the oil spills in the water bodies cause grave loss to marine life along with serious economic issues. It is not feasible to monitor the undersea pipelines manually because of the huge seafloor depth. For timely detection of such damage, a new technique using optical Fiber Bragg grating (FBG) sensors and its installation has been given in this work. The idea of an FBG sensor for detecting damage in pipeline structure based on the acoustic emission has been worked out. The numerical calculation has been done based on the fundamental of strain measurement and the output has been simulated using MATLAB.

  2. Minimum separation distances for natural gas pipeline and boilers in the 300 area, Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daling, P.M.; Graham, T.M.

    1997-08-01

    The U.S. Department of Energy (DOE) is proposing actions to reduce energy expenditures and improve energy system reliability at the 300 Area of the Hanford Site. These actions include replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing a new natural gas distribution system to provide a fuel source for many of these units, and constructing a central control building to operate and maintain the system. The individual heating units will include steam boilers that are to be housed in individual annex buildings located at some distance away from nearby 300 Area nuclearmore » facilities. This analysis develops the basis for siting the package boilers and natural gas distribution systems to be used to supply steam to 300 Area nuclear facilities. The effects of four potential fire and explosion scenarios involving the boiler and natural gas pipeline were quantified to determine minimum separation distances that would reduce the risks to nearby nuclear facilities. The resulting minimum separation distances are shown in Table ES.1.« less

  3. A preliminary systems-engineering study of an advanced nuclear-electrolytic hydrogen-production facility

    NASA Technical Reports Server (NTRS)

    Escher, W. J. D.; Donakowski, T. D.; Tison, R. R.

    1975-01-01

    An advanced nuclear-electrolytic hydrogen-production facility concept was synthesized at a conceptual level with the objective of minimizing estimated hydrogen-production costs. The concept is a closely-integrated, fully-dedicated (only hydrogen energy is produced) system whose components and subsystems are predicted on ''1985 technology.'' The principal components are: (1) a high-temperature gas-cooled reactor (HTGR) operating a helium-Brayton/ammonia-Rankine binary cycle with a helium reactor-core exit temperature of 980 C, (2) acyclic d-c generators, (3) high-pressure, high-current-density electrolyzers based on solid-polymer electrolyte technology. Based on an assumed 3,000 MWt HTGR the facility is capable of producing 8.7 million std cu m/day of hydrogen at pipeline conditions, 6,900 kPa. Coproduct oxygen is also available at pipeline conditions at one-half this volume. It has further been shown that the incorporation of advanced technology provides an overall efficiency of about 43 percent, as compared with 25 percent for a contemporary nuclear-electric plant powering close-coupled contemporary industrial electrolyzers.

  4. Critical evaluation of mechanistic two-phase flow pipeline and well simulation models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dhulesia, H.; Lopez, D.

    1996-12-31

    Mechanistic steady state simulation models, rather than empirical correlations, are used for a design of multiphase production system including well, pipeline and downstream installations. Among the available models, PEPITE, WELLSIM, OLGA, TACITE and TUFFP are widely used for this purpose and consequently, a critical evaluation of these models is needed. An extensive validation methodology is proposed which consists of two distinct steps: first to validate the hydrodynamic point model using the test loop data and, then to validate the over-all simulation model using the real pipelines and wells data. The test loop databank used in this analysis contains about 5952more » data sets originated from four different test loops and a majority of these data are obtained at high pressures (up to 90 bars) with real hydrocarbon fluids. Before performing the model evaluation, physical analysis of the test loops data is required to eliminate non-coherent data. The evaluation of these point models demonstrates that the TACITE and OLGA models can be applied to any configuration of pipes. The TACITE model performs better than the OLGA model because it uses the most appropriate closure laws from the literature validated on a large number of data. The comparison of predicted and measured pressure drop for various real pipelines and wells demonstrates that the TACITE model is a reliable tool.« less

  5. A Pipeline for Large Data Processing Using Regular Sampling for Unstructured Grids

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berres, Anne Sabine; Adhinarayanan, Vignesh; Turton, Terece

    2017-05-12

    Large simulation data requires a lot of time and computational resources to compute, store, analyze, visualize, and run user studies. Today, the largest cost of a supercomputer is not hardware but maintenance, in particular energy consumption. Our goal is to balance energy consumption and cognitive value of visualizations of resulting data. This requires us to go through the entire processing pipeline, from simulation to user studies. To reduce the amount of resources, data can be sampled or compressed. While this adds more computation time, the computational overhead is negligible compared to the simulation time. We built a processing pipeline atmore » the example of regular sampling. The reasons for this choice are two-fold: using a simple example reduces unnecessary complexity as we know what to expect from the results. Furthermore, it provides a good baseline for future, more elaborate sampling methods. We measured time and energy for each test we did, and we conducted user studies in Amazon Mechanical Turk (AMT) for a range of different results we produced through sampling.« less

  6. The visual and radiological inspection of a pipeline using a teleoperated pipe crawler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fogle, R.F.; Kuelske, K.; Kellner, R.

    1995-01-01

    In the 1950s, the Savannah River Site built an open, unlined retention basin to temporarily store potentially radionuclide contaminated cooling water from a chemical separations process and storm water drainage from a nearby waste management facility that stored large quantities of nuclear fission byproducts in carbon steel tanks. The retention basin was retired from service in 1972 when a new, lined basin was completed. In 1978, the old retention basin was excavated, backfilled with uncontaminated dirt, and covered with grass. At the same time, much of the underground process pipeline leading to the basin was abandoned. Since the closure ofmore » the retention basin, new environmental regulations require that the basin undergo further assessment to determine whether additional remediation is required. A visual and radiological inspection of the pipeline was necessary to aid in the remediation decision making process for the retention basin system. A teleoperated pipe crawler inspection system was developed to survey the abandoned sections of underground pipelines leading to the retired retention basin. This paper will describe the background to this project, the scope of the investigation, the equipment requirements, and the results of the pipeline inspection.« less

  7. The inspection of a radiologically contaminated pipeline using a teleoperated pipe crawler

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fogle, R.F.; Kuelske, K.; Kellner, R.A.

    1995-08-01

    In the 1950s, the Savannah River Site built an open, unlined retention basin to temporarily store potentially radionuclide contaminated cooling water from a chemical separations process and storm water drainage from a nearby waste management facility that stored large quantities of nuclear fission byproducts in carbon steel tanks. The retention basin was retired from service in 1972 when a new, lined basin was completed. In 1978, the old retention basin was excavated, backfilled with uncontaminated dirt, and covered with grass. At the same time, much of the underground process pipeline leading to the basin was abandoned. Since the closure ofmore » the retention basin, new environmental regulations require that the basin undergo further assessment to determine whether additional remediation is required. A visual and radiological inspection of the pipeline was necessary to aid in the remediation decision making process for the retention basin system. A teleoperated pipe crawler inspection system was developed to survey the abandoned sections of underground pipelines leading to the retired retention basin. This paper will describe the background to this project, the scope of the investigation, the equipment requirements, and the results of the pipeline inspection.« less

  8. 49 CFR 193.2401 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Equipment § 193.2401 Scope. After March 31, 2000, each new, replaced, relocated or significantly altered vaporization equipment, liquefaction equipment, and control systems must be...

  9. Freight Transportation Energy Use : Volume 3. Freight Network and Operations Database.

    DOT National Transportation Integrated Search

    1979-07-01

    The data sources, procedures, and assumptions used to generate the TSC national freight network and operations database are documented. National rail, highway, waterway, and pipeline networks are presented, and estimates of facility capacity, travel ...

  10. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less

  11. e-Infrastructures for Astronomy: An Integrated View

    NASA Astrophysics Data System (ADS)

    Pasian, F.; Longo, G.

    2010-12-01

    As for other disciplines, the capability of performing “Big Science” in astrophysics requires the availability of large facilities. In the field of ICT, computational resources (e.g. HPC) are important, but are far from being enough for the community: as a matter of fact, the whole set of e-infrastructures (network, computing nodes, data repositories, applications) need to work in an interoperable way. This implies the development of common (or at least compatible) user interfaces to computing resources, transparent access to observations and numerical simulations through the Virtual Observatory, integrated data processing pipelines, data mining and semantic web applications. Achieving this interoperability goal is a must to build a real “Knowledge Infrastructure” in the astrophysical domain. Also, the emergence of new professional profiles (e.g. the “astro-informatician”) is necessary to allow defining and implementing properly this conceptual schema.

  12. Simulated emergencies test preparedness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Atkinson, J.D.

    This paper reports that Canadian western Natural Gas has developed emergency plans to enable the company to respond effectively to natural gas incidents. Emergency procedures and training manuals have been developed over many years, stressing prevention first and foremost, and then effective response in the event of an actual occurrence. Canadian western is a natural gas utility serving the southern half of the province of Alberta. It is owned and operated by Canadian Utilities Ltd., which also owns and operates Northwestern Utilities Ltd. in central and northern Alberta. The company has production, storage, transmission and distribution facilities throughout an extensivemore » franchise area. It operates more than 11,000 miles of transmission and distribution pipeline to serve more than 315,000 customers in 115 communities. Canadian Western provides gas service to two major urban centers, the cities of Calgary and Lethbridge.« less

  13. UOE Pipe Numerical Model: Manufacturing Process And Von Mises Residual Stresses Resulted After Each Technological Step

    NASA Astrophysics Data System (ADS)

    Delistoian, Dmitri; Chirchor, Mihael

    2017-12-01

    Fluid transportation from production areas to final customer is effectuated by pipelines. For oil and gas industry, pipeline safety and reliability represents a priority. From this reason, pipe quality guarantee directly influence pipeline designed life, but first of all protects environment. A significant number of longitudinally welded pipes, for onshore/offshore pipelines, are manufactured by UOE method. This method is based on cold forming. In present study, using finite element method is modeled UOE pipe manufacturing process and is obtained von Mises stresses for each step. Numerical simulation is performed for L415 MB (X60) steel plate with 7,9 mm thickness, length 30 mm and width 1250mm, as result it is obtained a DN 400 pipe.

  14. Applications study of advanced power generation systems utilizing coal-derived fuels, volume 2

    NASA Technical Reports Server (NTRS)

    Robson, F. L.

    1981-01-01

    Technology readiness and development trends are discussed for three advanced power generation systems: combined cycle gas turbine, fuel cells, and magnetohydrodynamics. Power plants using these technologies are described and their performance either utilizing a medium-Btu coal derived fuel supplied by pipeline from a large central coal gasification facility or integrated with a gasification facility for supplying medium-Btu fuel gas is assessed.

  15. 2010 Homeland Security Symposium and Exhibition Held in Arlington, Virginia on September 28-29, 2010

    DTIC Science & Technology

    2010-09-29

    Natural gas pipelines • Oil terminals; Pump stations • Electric substations • Water facilities • Wastewater facilities • Airports • Roads • Railroads... Gas /Crude Oil  Telecommunications  Water  Healthcare/Public Health Critical Infrastructure Interdependencies BUILDING STRONG® DSES-10 Regional...Preparedness Policy, Office on Resilience, National Security Council, The White House • Mr. Paul Molitor, Senior Industry Director, Smart Grid and

  16. The Zwicky Transient Facility Public Alert Stream

    NASA Astrophysics Data System (ADS)

    Masci, F.; Kulkarni, S. R.; Graham, M.; Prince, T.; Helou, G.

    2018-06-01

    The Zwicky Transient Facility (ZTF; ATel #11266) announces the start of public alerts. These alerts will originate from the ZTF public surveys (Bellm & Kulkarni 2017; Nature Astronomy 1, 71) as described at www.ztf.caltech.edu/page/msip Alerts are generated by the ZTF Science Data System housed at IPAC-Caltech (www.ipac.caltech.edu) using a realtime image-subtraction pipeline (Masci et al. 2018; www.ztf.caltech.edu/page/technical).

  17. Simulation of a manual electric-arc welding in a working gas pipeline. 2. Numerical investigation of the temperature-stress distribution in the wall of a gas pipe

    NASA Astrophysics Data System (ADS)

    Baikov, V. I.; Gishkelyuk, I. A.; Rus', A. M.; Sidorovich, T. V.; Tonkonogov, B. A.

    2010-11-01

    A numerical simulation of the action of the current experienced by an electric arc and the rate of gas flow in a pipe of a cross-country gas pipeline on the depth of penetration of the electric arc into the wall of this pipe and on the current and residual stresses arising in the pipe material in the process of electric-arc welding of nonthrough cavity-like defects in it has been carried out for gas pipes with walls of different thickness.

  18. Simulation of a manual electric-arc welding in a working gas pipeline. 1. Formulation of the problem

    NASA Astrophysics Data System (ADS)

    Baikov, V. I.; Gishkelyuk, I. A.; Rus', A. M.; Sidorovich, T. V.; Tonkonogov, B. A.

    2010-11-01

    Problems of mathematical simulation of the temperature stresses arising in the wall of a pipe of a cross-country gas pipeline in the process of electric-arc welding of defects in it have been considered. Mathematical models of formation of temperatures, deformations, and stresses in a gas pipe subjected to phase transformations have been developed. These models were numerically realized in the form of algorithms representing a part of an application-program package. Results of verification of the computational complex and calculation results obtained with it are presented.

  19. Assessing fugitive emissions of CH4 from high-pressure gas pipelines

    NASA Astrophysics Data System (ADS)

    Worrall, Fred; Boothroyd, Ian; Davies, Richard

    2017-04-01

    The impact of unconventional natural gas production using hydraulic fracturing methods from shale gas basins has been assessed using life-cycle emissions inventories, covering areas such as pre-production, production and transmission processes. The transmission of natural gas from well pad to processing plants and its transport to domestic sites is an important source of fugitive CH4, yet emissions factors and fluxes from transmission processes are often based upon ver out of date measurements. It is important to determine accurate measurements of natural gas losses when compressed and transported between production and processing facilities so as to accurately determine life-cycle CH4 emissions. This study considers CH4 emissions from the UK National Transmission System (NTS) of high pressure natural gas pipelines. Mobile surveys of CH4 emissions using a Picarro Surveyor cavity-ring-down spectrometer were conducted across four areas in the UK, with routes bisecting high pressure pipelines and separate control routes away from the pipelines. A manual survey of soil gas measurements was also conducted along one of the high pressure pipelines using a tunable diode laser. When wind adjusted 92 km of high pressure pipeline and 72 km of control route were drive over a 10 day period. When wind and distance adjusted CH4 fluxes were significantly greater on routes with a pipeline than those without. The smallest leak detectable was 3% above ambient (1.03 relative concentration) with any leaks below 3% above ambient assumed ambient. The number of leaks detected along the pipelines correlate to the estimated length of pipe joints, inferring that there are constant fugitive CH4 emissions from these joints. When scaled up to the UK's National Transmission System pipeline length of 7600 km gives a fugitive CH4 flux of 4700 ± 2864 kt CH4/yr - this fugitive emission from high pressure pipelines is 0.016% of the annual gas supply.

  20. 76 FR 14654 - Gulfstream Natural Gas System, L.L.C. Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... design and construct, one 30-inch tie-in assembly connecting the outlet of the Gulf LNG Pipeline facilities to Gulfstream's 36-inch diameter Line No. 060, electronic gas measurement equipment, and...

  1. 30 CFR 285.657 - What must I do upon completion of approved activities under my GAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL... your decommissioning application as provided in §§ 285.905 and 285.906. Cable and Pipeline Deviations ...

  2. Aerial image databases for pipeline rights-of-way management

    NASA Astrophysics Data System (ADS)

    Jadkowski, Mark A.

    1996-03-01

    Pipeline companies that own and manage extensive rights-of-way corridors are faced with ever-increasing regulatory pressures, operating issues, and the need to remain competitive in today's marketplace. Automation has long been an answer to the problem of having to do more work with less people, and Automated Mapping/Facilities Management/Geographic Information Systems (AM/FM/GIS) solutions have been implemented at several pipeline companies. Until recently, the ability to cost-effectively acquire and incorporate up-to-date aerial imagery into these computerized systems has been out of the reach of most users. NASA's Earth Observations Commercial Applications Program (EOCAP) is providing a means by which pipeline companies can bridge this gap. The EOCAP project described in this paper includes a unique partnership with NASA and James W. Sewall Company to develop an aircraft-mounted digital camera system and a ground-based computer system to geometrically correct and efficiently store and handle the digital aerial images in an AM/FM/GIS environment. This paper provides a synopsis of the project, including details on (1) the need for aerial imagery, (2) NASA's interest and role in the project, (3) the design of a Digital Aerial Rights-of-Way Monitoring System, (4) image georeferencing strategies for pipeline applications, and (5) commercialization of the EOCAP technology through a prototype project at Algonquin Gas Transmission Company which operates major gas pipelines in New England, New York, and New Jersey.

  3. Rapid simulation of X-ray transmission imaging for baggage inspection via GPU-based ray-tracing

    NASA Astrophysics Data System (ADS)

    Gong, Qian; Stoian, Razvan-Ionut; Coccarelli, David S.; Greenberg, Joel A.; Vera, Esteban; Gehm, Michael E.

    2018-01-01

    We present a pipeline that rapidly simulates X-ray transmission imaging for arbitrary system architectures using GPU-based ray-tracing techniques. The purpose of the pipeline is to enable statistical analysis of threat detection in the context of airline baggage inspection. As a faster alternative to Monte Carlo methods, we adopt a deterministic approach for simulating photoelectric absorption-based imaging. The highly-optimized NVIDIA OptiX API is used to implement ray-tracing, greatly speeding code execution. In addition, we implement the first hierarchical representation structure to determine the interaction path length of rays traversing heterogeneous media described by layered polygons. The accuracy of the pipeline has been validated by comparing simulated data with experimental data collected using a heterogenous phantom and a laboratory X-ray imaging system. On a single computer, our approach allows us to generate over 400 2D transmission projections (125 × 125 pixels per frame) per hour for a bag packed with hundreds of everyday objects. By implementing our approach on cloud-based GPU computing platforms, we find that the same 2D projections of approximately 3.9 million bags can be obtained in a single day using 400 GPU instances, at a cost of only 0.001 per bag.

  4. The inverse electroencephalography pipeline

    NASA Astrophysics Data System (ADS)

    Weinstein, David Michael

    The inverse electroencephalography (EEG) problem is defined as determining which regions of the brain are active based on remote measurements recorded with scalp EEG electrodes. An accurate solution to this problem would benefit both fundamental neuroscience research and clinical neuroscience applications. However, constructing accurate patient-specific inverse EEG solutions requires complex modeling, simulation, and visualization algorithms, and to date only a few systems have been developed that provide such capabilities. In this dissertation, a computational system for generating and investigating patient-specific inverse EEG solutions is introduced, and the requirements for each stage of this Inverse EEG Pipeline are defined and discussed. While the requirements of many of the stages are satisfied with existing algorithms, others have motivated research into novel modeling and simulation methods. The principal technical results of this work include novel surface-based volume modeling techniques, an efficient construction for the EEG lead field, and the Open Source release of the Inverse EEG Pipeline software for use by the bioelectric field research community. In this work, the Inverse EEG Pipeline is applied to three research problems in neurology: comparing focal and distributed source imaging algorithms; separating measurements into independent activation components for multifocal epilepsy; and localizing the cortical activity that produces the P300 effect in schizophrenia.

  5. An approximate inverse scattering technique for reconstructing blockage profiles in water pipelines using acoustic transients.

    PubMed

    Jing, Liwen; Li, Zhao; Wang, Wenjie; Dubey, Amartansh; Lee, Pedro; Meniconi, Silvia; Brunone, Bruno; Murch, Ross D

    2018-05-01

    An approximate inverse scattering technique is proposed for reconstructing cross-sectional area variation along water pipelines to deduce the size and position of blockages. The technique allows the reconstructed blockage profile to be written explicitly in terms of the measured acoustic reflectivity. It is based upon the Born approximation and provides good accuracy, low computational complexity, and insight into the reconstruction process. Numerical simulations and experimental results are provided for long pipelines with mild and severe blockages of different lengths. Good agreement is found between the inverse result and the actual pipe condition for mild blockages.

  6. Application Analysis of BIM Technology in Metro Rail Transit

    NASA Astrophysics Data System (ADS)

    Liu, Bei; Sun, Xianbin

    2018-03-01

    With the rapid development of urban roads, especially the construction of subway rail transit, it is an effective way to alleviate urban traffic congestion. There are limited site space, complex resource allocation, tight schedule, underground pipeline complex engineering problems. BIM technology, three-dimensional visualization, parameterization, virtual simulation and many other advantages can effectively solve these technical problems. Based on the project of Shenzhen Metro Line 9, BIM technology is innovatively researched throughout the lifecycle of BIM technology in the context of the metro rail transit project rarely used at this stage. The model information file is imported into Navisworks for four-dimensional animation simulation to determine the optimum construction scheme of the shield machine. Subway construction management application platform based on BIM and private cloud technology, the use of cameras and sensors to achieve electronic integration, dynamic monitoring of the operation and maintenance of underground facilities. Make full use of the many advantages of BIM technology to improve the engineering quality and construction efficiency of the subway rail transit project and to complete the operation and maintenance.

  7. Study on the flow in the pipelines of the support system of circulating fluidized bed

    NASA Astrophysics Data System (ADS)

    Meng, L.; Yang, J.; Zhou, L. J.; Wang, Z. W.; Zhuang, X. H.

    2013-12-01

    In the support system of Circulating Fluidized Bed (Below referred to as CFB) of thermal power plant, the pipelines of primary wind are used for transporting the cold air to the boiler, which is important in controlling and combustion effect. The pipeline design will greatly affect the energy loss of the system, and accordingly affect the thermal power plant economic benefits and production environment. Three-dimensional numerical simulation is carried out for the pipeline internal flow field of a thermal power plant in this paper. Firstly three turbulence models were compared and the results showed that the SST k-ω model converged better and the energy losses predicted were closer to the experimental results. The influence of the pipeline design form on the flow characteristics are analysed, then the optimization designs of the pipeline are proposed according to the energy loss distribution of the flow field, in order to reduce energy loss and improve the efficiency of tunnel. The optimization plan turned out to be efficacious; about 36% of the pressure loss is reduced.

  8. Exploration Systems Health Management Facilities and Testbed Workshop

    NASA Technical Reports Server (NTRS)

    Wilson, Scott; Waterman, Robert; McCleskey, Carey

    2004-01-01

    Presentation Agenda : (1) Technology Maturation Pipeline (The Plan) (2) Cryogenic testbed (and other KSC Labs) (2a) Component / Subsystem technologies (3) Advanced Technology Development Center (ATDC) (3a) System / Vehic1e technologies (4) EL V Flight Experiments (Flight Testbeds).

  9. 49 CFR 193.2915 - Alternative power sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Alternative power sources. 193.2915 Section 193.2915 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... GAS FACILITIES: FEDERAL SAFETY STANDARDS Security § 193.2915 Alternative power sources. An alternative...

  10. 40 CFR 280.12 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Amendments and Reauthorization Act of 1986. Septic tank is a water-tight covered receptacle designed to... premises where stored; (c) Septic tank; (d) Pipeline facility (including gathering lines) regulated under... STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST...

  11. 40 CFR 61.301 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene Emissions From Benzene Transfer Operations § 61.301 Definitions. As used in this subpart, all terms not defined herein... means any facility which receives liquid product containing benzene by pipelines, marine vessels, tank...

  12. 40 CFR 61.301 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene Emissions From Benzene Transfer Operations § 61.301 Definitions. As used in this subpart, all terms not defined herein... means any facility which receives liquid product containing benzene by pipelines, marine vessels, tank...

  13. 40 CFR 61.301 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene Emissions From Benzene Transfer Operations § 61.301 Definitions. As used in this subpart, all terms not defined herein... means any facility which receives liquid product containing benzene by pipelines, marine vessels, tank...

  14. 40 CFR 61.301 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene Emissions From Benzene Transfer Operations § 61.301 Definitions. As used in this subpart, all terms not defined herein... means any facility which receives liquid product containing benzene by pipelines, marine vessels, tank...

  15. 40 CFR 61.301 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene Emissions From Benzene Transfer Operations § 61.301 Definitions. As used in this subpart, all terms not defined herein... means any facility which receives liquid product containing benzene by pipelines, marine vessels, tank...

  16. 30 CFR 75.1903 - Underground diesel fuel storage facilities and areas; construction and safety precautions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... percent of the maximum capacity of the fuel storage system; and (7) Provided with a competent concrete... any buildup pressure before heat is applied. (2) Diesel fuel shall not be allowed to enter pipelines...

  17. 30 CFR 75.1903 - Underground diesel fuel storage facilities and areas; construction and safety precautions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... percent of the maximum capacity of the fuel storage system; and (7) Provided with a competent concrete... any buildup pressure before heat is applied. (2) Diesel fuel shall not be allowed to enter pipelines...

  18. 30 CFR 75.1903 - Underground diesel fuel storage facilities and areas; construction and safety precautions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... percent of the maximum capacity of the fuel storage system; and (7) Provided with a competent concrete... any buildup pressure before heat is applied. (2) Diesel fuel shall not be allowed to enter pipelines...

  19. 30 CFR 75.1903 - Underground diesel fuel storage facilities and areas; construction and safety precautions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... percent of the maximum capacity of the fuel storage system; and (7) Provided with a competent concrete... any buildup pressure before heat is applied. (2) Diesel fuel shall not be allowed to enter pipelines...

  20. 77 FR 72431 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... principle place of business at 333 Clay Street, Suite 1600, Houston Texas, 77002. Plains LPG is a subsidiary... with regard to whether issuing a new Presidential Permit reflecting the corporate succession and...

  1. 77 FR 72430 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... business at 333 Clay Street, Suite 1600, Houston Texas, 77002. Plains LPG is a subsidiary of Plains All... whether issuing a new Presidential Permit reflecting the corporate succession and authorizing Plains LPG...

  2. 49 CFR 193.2515 - Investigations of failures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Investigations of failures. 193.2515 Section 193.2515 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... GAS FACILITIES: FEDERAL SAFETY STANDARDS Operations § 193.2515 Investigations of failures. (a) Each...

  3. 49 CFR 193.2515 - Investigations of failures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Investigations of failures. 193.2515 Section 193.2515 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... GAS FACILITIES: FEDERAL SAFETY STANDARDS Operations § 193.2515 Investigations of failures. (a) Each...

  4. 49 CFR 193.2515 - Investigations of failures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Investigations of failures. 193.2515 Section 193.2515 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... GAS FACILITIES: FEDERAL SAFETY STANDARDS Operations § 193.2515 Investigations of failures. (a) Each...

  5. 49 CFR 193.2515 - Investigations of failures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Investigations of failures. 193.2515 Section 193.2515 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... GAS FACILITIES: FEDERAL SAFETY STANDARDS Operations § 193.2515 Investigations of failures. (a) Each...

  6. 75 FR 10242 - Tennessee Gas Pipeline Company; Notice of Availability of the Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... Jersey; Installation of associated appurtenant aboveground facilities including mainline valves and pig \\2\\ launchers/receivers; and \\2\\ A pig is an internal tool that can be used to clean and dry a...

  7. 75 FR 5312 - ETC Tiger Pipeline Company, LLC; Notice of Availability of the Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ... quality of the human environment. This EA was prepared in cooperation with U.S. Army Corps of Engineers, U... Three pig launcher/receiver facilities associated with the Carthage and Bienville Compressor Stations...

  8. Exploration and Production of Hydrocarbon Resources in Coastal Alabama and Mississippi.

    DTIC Science & Technology

    1984-11-01

    and R.L. Bluntzer. 984. Laud Subsidence Near Oil and Gas Fields , Houston, Texas. Ground Water 22(4):450-459. Holzworth, G.C. 1972. Mixing Heights, Wind... field is abandoned., The operation of drilling rigs, offshore production facilities, and onshore gas and oil cleaning and processing facilities would...a pipeline releasing natural gas containing hydrogen sulfide could endanger human health and be harmful .-. to plants and animals near the point of

  9. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-01-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter. Initial pilot facility shakedown was completed during the fourth quarter. During pilot plant shakedown operations, several production batch test runs were performed. These pilot tests were coupled with laboratory testing to confirm pilot results. In initial batches of operations, cellulose to glucose conversionsmore » of 62.5% and 64.8% were observed in laboratory hydrolysis. As part of this testing, lignin dewatering was tested using laboratory and vendor-supplied filtration equipment. Dewatering tests reported moisture contents in the lignin of between 50% and 60%. Dewatering parameters and options will continue to be investigated during lignin production. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. Shredding of the feed material was completed and final drying of the feed is expected to be completed by late January. Once feed drying is completed, pilot facility production will begin to produce lignin for co-fire testing. Facility modifications are expected to continue to improve facility operations and performance during the first quarter of 2001. The TVA-Colbert facility continues to make progress in evaluating the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system continues.« less

  10. The pipeline system for Octave and Matlab (PSOM): a lightweight scripting framework and execution engine for scientific workflows.

    PubMed

    Bellec, Pierre; Lavoie-Courchesne, Sébastien; Dickinson, Phil; Lerch, Jason P; Zijdenbos, Alex P; Evans, Alan C

    2012-01-01

    The analysis of neuroimaging databases typically involves a large number of inter-connected steps called a pipeline. The pipeline system for Octave and Matlab (PSOM) is a flexible framework for the implementation of pipelines in the form of Octave or Matlab scripts. PSOM does not introduce new language constructs to specify the steps and structure of the workflow. All steps of analysis are instead described by a regular Matlab data structure, documenting their associated command and options, as well as their input, output, and cleaned-up files. The PSOM execution engine provides a number of automated services: (1) it executes jobs in parallel on a local computing facility as long as the dependencies between jobs allow for it and sufficient resources are available; (2) it generates a comprehensive record of the pipeline stages and the history of execution, which is detailed enough to fully reproduce the analysis; (3) if an analysis is started multiple times, it executes only the parts of the pipeline that need to be reprocessed. PSOM is distributed under an open-source MIT license and can be used without restriction for academic or commercial projects. The package has no external dependencies besides Matlab or Octave, is straightforward to install and supports of variety of operating systems (Linux, Windows, Mac). We ran several benchmark experiments on a public database including 200 subjects, using a pipeline for the preprocessing of functional magnetic resonance images (fMRI). The benchmark results showed that PSOM is a powerful solution for the analysis of large databases using local or distributed computing resources.

  11. The pipeline system for Octave and Matlab (PSOM): a lightweight scripting framework and execution engine for scientific workflows

    PubMed Central

    Bellec, Pierre; Lavoie-Courchesne, Sébastien; Dickinson, Phil; Lerch, Jason P.; Zijdenbos, Alex P.; Evans, Alan C.

    2012-01-01

    The analysis of neuroimaging databases typically involves a large number of inter-connected steps called a pipeline. The pipeline system for Octave and Matlab (PSOM) is a flexible framework for the implementation of pipelines in the form of Octave or Matlab scripts. PSOM does not introduce new language constructs to specify the steps and structure of the workflow. All steps of analysis are instead described by a regular Matlab data structure, documenting their associated command and options, as well as their input, output, and cleaned-up files. The PSOM execution engine provides a number of automated services: (1) it executes jobs in parallel on a local computing facility as long as the dependencies between jobs allow for it and sufficient resources are available; (2) it generates a comprehensive record of the pipeline stages and the history of execution, which is detailed enough to fully reproduce the analysis; (3) if an analysis is started multiple times, it executes only the parts of the pipeline that need to be reprocessed. PSOM is distributed under an open-source MIT license and can be used without restriction for academic or commercial projects. The package has no external dependencies besides Matlab or Octave, is straightforward to install and supports of variety of operating systems (Linux, Windows, Mac). We ran several benchmark experiments on a public database including 200 subjects, using a pipeline for the preprocessing of functional magnetic resonance images (fMRI). The benchmark results showed that PSOM is a powerful solution for the analysis of large databases using local or distributed computing resources. PMID:22493575

  12. U-PLANT GEOGRAPHIC ZONE CLEANUP PROTOTYPE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMINE, L.D.

    2006-02-01

    The U Plant geographic zone (UPZ) occupies 0.83 square kilometers on the Hanford Site Central Plateau (200 Area). It encompasses the U Plant canyon (221-U Facility), ancillary facilities that supported the canyon, soil waste sites, and underground pipelines. The UPZ cleanup initiative coordinates the cleanup of the major facilities, ancillary facilities, waste sites, and contaminated pipelines (collectively identified as ''cleanup items'') within the geographic zone. The UPZ was selected as a geographic cleanup zone prototype for resolving regulatory, technical, and stakeholder issues and demonstrating cleanup methods for several reasons: most of the area is inactive, sufficient characterization information is availablemore » to support decisions, cleanup of the high-risk waste sites will help protect the groundwater, and the zone contains a representative cross-section of the types of cleanup actions that will be required in other geographic zones. The UPZ cleanup demonstrates the first of 22 integrated zone cleanup actions on the Hanford Site Central Plateau to address threats to groundwater, the environment, and human health. The UPZ contains more than 100 individual cleanup items. Cleanup actions in the zone will be undertaken using multiple regulatory processes and decision documents. Cleanup actions will include building demolition, waste site and pipeline excavation, and the construction of multiple, large engineered barriers. In some cases, different cleanup actions may be taken at item locations that are immediately adjacent to each other. The cleanup planning and field activities for each cleanup item must be undertaken in a coordinated and cohesive manner to ensure effective execution of the UPZ cleanup initiative. The UPZ zone cleanup implementation plan (ZCIP) was developed to address the need for a fundamental integration tool for UPZ cleanup. As UPZ cleanup planning and implementation moves forward, the ZCIP is intended to be a living document that will provide a focal point for integrating UPZ actions, including field cleanup activities, waste staging and handling, and post-cleanup monitoring and institutional controls.« less

  13. Integration of QUARK and I-TASSER for ab initio protein structure prediction in CASP11

    PubMed Central

    Zhang, Wenxuan; Yang, Jianyi; He, Baoji; Walker, Sara Elizabeth; Zhang, Hongjiu; Govindarajoo, Brandon; Virtanen, Jouko; Xue, Zhidong; Shen, Hong-Bin; Zhang, Yang

    2015-01-01

    We tested two pipelines developed for template-free protein structure prediction in the CASP11 experiment. First, the QUARK pipeline constructs structure models by reassembling fragments of continuously distributed lengths excised from unrelated proteins. Five free-modeling (FM) targets have the model successfully constructed by QUARK with a TM-score above 0.4, including the first model of T0837-D1, which has a TM-score=0.736 and RMSD=2.9 Å to the native. Detailed analysis showed that the success is partly attributed to the high-resolution contact map prediction derived from fragment-based distance-profiles, which are mainly located between regular secondary structure elements and loops/turns and help guide the orientation of secondary structure assembly. In the Zhang-Server pipeline, weakly scoring threading templates are re-ordered by the structural similarity to the ab initio folding models, which are then reassembled by I-TASSER based structure assembly simulations; 60% more domains with length up to 204 residues, compared to the QUARK pipeline, were successfully modeled by the I-TASSER pipeline with a TM-score above 0.4. The robustness of the I-TASSER pipeline can stem from the composite fragment-assembly simulations that combine structures from both ab initio folding and threading template refinements. Despite the promising cases, challenges still exist in long-range beta-strand folding, domain parsing, and the uncertainty of secondary structure prediction; the latter of which was found to affect nearly all aspects of FM structure predictions, from fragment identification, target classification, structure assembly, to final model selection. Significant efforts are needed to solve these problems before real progress on FM could be made. PMID:26370505

  14. Integration of QUARK and I-TASSER for Ab Initio Protein Structure Prediction in CASP11.

    PubMed

    Zhang, Wenxuan; Yang, Jianyi; He, Baoji; Walker, Sara Elizabeth; Zhang, Hongjiu; Govindarajoo, Brandon; Virtanen, Jouko; Xue, Zhidong; Shen, Hong-Bin; Zhang, Yang

    2016-09-01

    We tested two pipelines developed for template-free protein structure prediction in the CASP11 experiment. First, the QUARK pipeline constructs structure models by reassembling fragments of continuously distributed lengths excised from unrelated proteins. Five free-modeling (FM) targets have the model successfully constructed by QUARK with a TM-score above 0.4, including the first model of T0837-D1, which has a TM-score = 0.736 and RMSD = 2.9 Å to the native. Detailed analysis showed that the success is partly attributed to the high-resolution contact map prediction derived from fragment-based distance-profiles, which are mainly located between regular secondary structure elements and loops/turns and help guide the orientation of secondary structure assembly. In the Zhang-Server pipeline, weakly scoring threading templates are re-ordered by the structural similarity to the ab initio folding models, which are then reassembled by I-TASSER based structure assembly simulations; 60% more domains with length up to 204 residues, compared to the QUARK pipeline, were successfully modeled by the I-TASSER pipeline with a TM-score above 0.4. The robustness of the I-TASSER pipeline can stem from the composite fragment-assembly simulations that combine structures from both ab initio folding and threading template refinements. Despite the promising cases, challenges still exist in long-range beta-strand folding, domain parsing, and the uncertainty of secondary structure prediction; the latter of which was found to affect nearly all aspects of FM structure predictions, from fragment identification, target classification, structure assembly, to final model selection. Significant efforts are needed to solve these problems before real progress on FM could be made. Proteins 2016; 84(Suppl 1):76-86. © 2015 Wiley Periodicals, Inc. © 2015 Wiley Periodicals, Inc.

  15. MEASURING TRANSIT SIGNAL RECOVERY IN THE KEPLER PIPELINE. I. INDIVIDUAL EVENTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Christiansen, Jessie L.; Clarke, Bruce D.; Burke, Christopher J.

    The Kepler mission was designed to measure the frequency of Earth-size planets in the habitable zone of Sun-like stars. A crucial component for recovering the underlying planet population from a sample of detected planets is understanding the completeness of that sample-the fraction of the planets that could have been discovered in a given data set that actually were detected. Here, we outline the information required to determine the sample completeness, and describe an experiment to address a specific aspect of that question, i.e., the issue of transit signal recovery. We investigate the extent to which the Kepler pipeline preserves individualmore » transit signals by injecting simulated transits into the pixel-level data, processing the modified pixels through the pipeline, and comparing the measured transit signal-to-noise ratio (S/N) to that expected without perturbation by the pipeline. We inject simulated transit signals across the full focal plane for a set of observations for a duration of 89 days. On average, we find that the S/N of the injected signal is recovered at MS = 0.9973({+-} 0.0012) Multiplication-Sign BS - 0.0151({+-} 0.0049), where MS is the measured S/N and BS is the baseline, or expected, S/N. The 1{sigma} width of the distribution around this correlation is {+-}2.64%. This indicates an extremely high fidelity in reproducing the expected detection statistics for single transit events, and provides teams performing their own periodic transit searches the confidence that there is no systematic reduction in transit signal strength introduced by the pipeline. We discuss the pipeline processes that cause the measured S/N to deviate significantly from the baseline S/N for a small fraction of targets; these are primarily the handling of data adjacent to spacecraft re-pointings and the removal of harmonics prior to the measurement of the S/N. Finally, we outline the further work required to characterize the completeness of the Kepler pipeline.« less

  16. Design Improvements and Analysis of Innovative High-Level Waste Pipeline Unplugging Technologies - 12171

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pribanic, Tomas; Awwad, Amer; Crespo, Jairo

    2012-07-01

    Transferring high-level waste (HLW) between storage tanks or to treatment facilities is a common practice performed at the Department of Energy (DoE) sites. Changes in the chemical and/or physical properties of the HLW slurry during the transfer process may lead to the formation of blockages inside the pipelines resulting in schedule delays and increased costs. To improve DoE's capabilities in the event of a pipeline plugging incident, FIU has continued to develop two novel unplugging technologies: an asynchronous pulsing system and a peristaltic crawler. The asynchronous pulsing system uses a hydraulic pulse generator to create pressure disturbances at two oppositemore » inlet locations of the pipeline to dislodge blockages by attacking the plug from both sides remotely. The peristaltic crawler is a pneumatic/hydraulic operated crawler that propels itself by a sequence of pressurization/depressurization of cavities (inner tubes). The crawler includes a frontal attachment that has a hydraulically powered unplugging tool. In this paper, details of the asynchronous pulsing system's ability to unplug a pipeline on a small-scale test-bed and results from the experimental testing of the second generation peristaltic crawler are provided. The paper concludes with future improvements for the third generation crawler and a recommended path forward for the asynchronous pulsing testing. (authors)« less

  17. Effect of Deformation Parameters on Microstructure and Properties During DIFT of X70HD Pipeline Steel

    NASA Astrophysics Data System (ADS)

    Wang, Jian; Zhu, Wei; Xiao, Hong; Zhang, Liang-liang; Qin, Hao; Yu, Yue

    2018-02-01

    Grain refinement is a critical approach to improve the strength of materials without damaging the toughness. The grains of deformation-induced ferrite are considerably smaller than those of proeutectoid ferrite. Grain refinement is crucial to the application of deformation-induced ferrite. The composition of ferrite and bainite or martensite is important in controlling the performance of X70HD pipeline steel, and cooling significantly influences the control of their ratio and grain size. By analyzing the static and dynamic phase-transition points using Gleeble-3800 thermal simulator, thermal simulations were performed through two-stage deformations in the austenite zone. Ferrite transformation rules were studied with thermal simulation tests under different deformation and cooling parameters based on the actual production of cumulative deformation. The influence of deformation parameters on the microstructure transformation was analyzed. Numerous fine-grain deformation-induced ferrites were obtained by regulating various parameters, including deformation temperature, strain rate, cooling rate, final cooling temperature and other parameters. Results of metallographic observation and microtensile testing revealed that the selection of appropriate parameters can refine the grains and improve the performance of the X70HD pipeline steel.

  18. PROGRAPE-1: A Programmable, Multi-Purpose Computer for Many-Body Simulations

    NASA Astrophysics Data System (ADS)

    Hamada, Tsuyoshi; Fukushige, Toshiyuki; Kawai, Atsushi; Makino, Junichiro

    2000-10-01

    We have developed PROGRAPE-1 (PROgrammable GRAPE-1), a programmable multi-purpose computer for many-body simulations. The main difference between PROGRAPE-1 and ``traditional'' GRAPE systems is that the former uses FPGA (Field Programmable Gate Array) chips as the processing elements, while the latter relies on a hardwired pipeline processor specialized to gravitational interactions. Since the logic implemented in FPGA chips can be reconfigured, we can use PROGRAPE-1 to calculate not only gravitational interactions, but also other forms of interactions, such as the van der Waals force, hydro\\-dynamical interactions in the SPHr calculation, and so on. PROGRAPE-1 comprises two Altera EPF10K100 FPGA chips, each of which contains nominally 100000 gates. To evaluate the programmability and performance of PROGRAPE-1, we implemented a pipeline for gravitational interactions similar to that of GRAPE-3. One pipeline is fitted into a single FPGA chip, operated at 16 MHz clock. Thus, for gravitational interactions, PROGRAPE-1 provided a speed of 0.96 Gflops-equivalent. PROGRAPE will prove to be useful for a wide-range of particle-based simulations in which the calculation cost of interactions other than gravity is high, such as the evaluation of SPH interactions.

  19. DIORAMA Communications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Galassi, Mark C.

    Diorama is written as a collection of modules that can run in separate threads or in separate processes. This defines a clear interface between the modules and also allows concurrent processing of different parts of the pipeline. The pipeline is determined by a description in a scenario file[Norman and Tornga, 2012, Tornga and Norman, 2014]. The scenario manager parses the XML scenario and sets up the sequence of modules which will generate an event, propagate the signal to a set of sensors, and then run processing modules on the results provided by those sensor simulations. During a run a varietymore » of “observer” and “processor” modules can be invoked to do interim analysis of results. Observers do not modify the simulation results, while processors may affect the final result. At the end of a run results are collated and final reports are put out. A detailed description of the scenario file and how it puts together a simulation are given in [Tornga and Norman, 2014]. The processing pipeline and how to program it with the Diorama API is described in Tornga et al. [2015] and Tornga and Wakeford [2015]. In this report I describe the communications infrastructure that is used.« less

  20. 7 CFR 1717.652 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Distribution borrower means a Distribution Borrower as defined in 7 CFR 1710.2. Electric system means all of the borrower's interests in all electric production, transmission, distribution, conservation, load management, general plant and other related facilities, equipment or property and in any mine, well, pipeline...

  1. LOOP marine and estuarine monitoring program, 1978-95 : volume 4 : zooplankton and ichthyoplankton.

    DOT National Transportation Integrated Search

    1998-01-01

    The Louisiana Offshore Oil Port (LOOP) facilities in coastal Louisiana provide the United States with the country's only Superport for off-loading deep draft tankers. The three single-point mooring (SPM) structures connected by pipelines to a platfor...

  2. 30 CFR 285.658 - Can my cable or pipeline construction deviate from my approved COP or GAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER..., RUE grant, or your lease addendum for a project easement in connection with your COP or GAP. (c) If...

  3. 49 CFR 193.2187 - Nonmetallic membrane liner.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Design Lng Storage Tanks § 193.2187 Nonmetallic membrane liner. A flammable nonmetallic membrane liner may not be used as an inner container in a storage tank...

  4. 76 FR 80926 - Dominion Transmission, Inc; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... approximately 735 feet of 8-inch diameter TL-369 Ext. 2 receiver pipeline facilities; and (3) construct two new... proposes to: (1) Replace approximately 14.98 miles of it's existing multi-diameter (12, 14, and 16-inch) TL...

  5. 75 FR 17708 - Kinder Morgan Louisiana Pipeline LLC; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... authorization to construct and operate a new tap, including ball valve and riser and approximately 15 feet of 8..., riser, 15-feet of 8-inch diameter piping and such other appurtenant facilities as deemed necessary to...

  6. 76 FR 73618 - Tennessee Gas Pipeline Company; Notice of Availability of the Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... federal action significantly affecting the quality of the human environment. The U.S. Fish and Wildlife... facilities including mainline valves and pig \\2\\ launchers and receivers; and \\2\\ A pig is an internal tool...

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hooker, J.N.

    This report describes an investigation of energy consumption and efficiency of oil pipelines in the US in 1978. It is based on a simulation of the actual movement of oil on a very detailed representation of the pipeline network, and it uses engineering equations to calculate the energy that pipeline pumps must have exerted on the oil to move it in this manner. The efficiencies of pumps and drivers are estimated so as to arrive at the amount of energy consumed at pumping stations. The throughput in each pipeline segment is estimated by distributing each pipeline company's reported oil movementsmore » over its segments in proportions predicted by regression equations that show typical throughput and throughput capacity as functions of pipe diameter. The form of the equations is justified by a generalized cost-engineering study of pipelining, and their parameters are estimated using new techniques developed for the purpose. A simplified model of flow scheduling is chosen on the basis of actual energy use data obtained from a few companies. The study yields energy consumption and intensiveness estimates for crude oil trunk lines, crude oil gathering lines and oil products lines, for the nation as well as by state and by pipe diameter. It characterizes the efficiency of typical pipelines of various diameters operating at capacity. Ancillary results include estimates of oil movements by state and by diameter and approximate pipeline capacity utilization nationwide.« less

  8. Transportation of natural and other gases and liquids by pipeline occupational safety and health standards

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-05-17

    The U.S. Materials Transportation Bureau (MTB) withdraws an advanced notice of proposed rulemaking (ANPR) which requested advice, recommendations, and information relating to the issuance of additional occupational safety and health standards for the protection of employees engaged in the construction, operation, and maintenance of pipeline systems and facilities used in the transportation of hazardous materials. Comments submitted in response to the ANPR indicated that the issuance of additional occupational safety and health standards by the MTB would be a duplication of the U.S. Occupational Safety and Health Administration's efforts and would increase the possibility of jurisdictional disputes. Since the MTB'smore » present standards development efforts are primarily directed at public safety (as opposed to occupational safety) by regulating pipeline design, construction, operation, and maintenance activities, the MTB withdraws the ANPR.« less

  9. Building a virtual ligand screening pipeline using free software: a survey.

    PubMed

    Glaab, Enrico

    2016-03-01

    Virtual screening, the search for bioactive compounds via computational methods, provides a wide range of opportunities to speed up drug development and reduce the associated risks and costs. While virtual screening is already a standard practice in pharmaceutical companies, its applications in preclinical academic research still remain under-exploited, in spite of an increasing availability of dedicated free databases and software tools. In this survey, an overview of recent developments in this field is presented, focusing on free software and data repositories for screening as alternatives to their commercial counterparts, and outlining how available resources can be interlinked into a comprehensive virtual screening pipeline using typical academic computing facilities. Finally, to facilitate the set-up of corresponding pipelines, a downloadable software system is provided, using platform virtualization to integrate pre-installed screening tools and scripts for reproducible application across different operating systems. © The Author 2015. Published by Oxford University Press.

  10. Building a virtual ligand screening pipeline using free software: a survey

    PubMed Central

    2016-01-01

    Virtual screening, the search for bioactive compounds via computational methods, provides a wide range of opportunities to speed up drug development and reduce the associated risks and costs. While virtual screening is already a standard practice in pharmaceutical companies, its applications in preclinical academic research still remain under-exploited, in spite of an increasing availability of dedicated free databases and software tools. In this survey, an overview of recent developments in this field is presented, focusing on free software and data repositories for screening as alternatives to their commercial counterparts, and outlining how available resources can be interlinked into a comprehensive virtual screening pipeline using typical academic computing facilities. Finally, to facilitate the set-up of corresponding pipelines, a downloadable software system is provided, using platform virtualization to integrate pre-installed screening tools and scripts for reproducible application across different operating systems. PMID:26094053

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrison, Cyrus; Larsen, Matt; Brugger, Eric

    Strawman is a system designed to explore the in situ visualization and analysis needs of simulation code teams running multi-physics calculations on many-core HPC architectures. It porvides rendering pipelines that can leverage both many-core CPUs and GPUs to render images of simulation meshes.

  12. Experimental study and empirical prediction of fuel flow parameters under air evolution conditions

    NASA Astrophysics Data System (ADS)

    Kitanina, E. E.; Kitanin, E. L.; Bondarenko, D. A.; Kravtsov, P. A.; Peganova, M. M.; Stepanov, S. G.; Zherebzov, V. L.

    2017-11-01

    Air evolution in kerosene under the effect of gravity flow with various hydraulic resistances in the pipeline was studied experimentally. The study was conducted at pressure ranging from 0.2 to 1.0 bar and temperature varying between -20°C and +20°C. Through these experiments, the oversaturation limit beyond which dissolved air starts evolving intensively from the fuel was established and the correlations for the calculation of pressure losses and air evolution on local loss elements were obtained. A method of calculating two-phase flow behaviour in a titled pipeline segment with very low mass flow quality and fairly high volume flow quality was developed. The complete set of empirical correlations obtained by experimental analysis was implemented in the engineering code. The software simulation results were repeatedly verified against our experimental findings and Airbus test data to show that the two-phase flow simulation agrees quite well with the experimental results obtained in the complex branched pipelines.

  13. Neural-Fuzzy model Based Steel Pipeline Multiple Cracks Classification

    NASA Astrophysics Data System (ADS)

    Elwalwal, Hatem Mostafa; Mahzan, Shahruddin Bin Hj.; Abdalla, Ahmed N.

    2017-10-01

    While pipes are cheaper than other means of transportation, this cost saving comes with a major price: pipes are subject to cracks, corrosion etc., which in turn can cause leakage and environmental damage. In this paper, Neural-Fuzzy model for multiple cracks classification based on Lamb Guide Wave. Simulation results for 42 sample were collected using ANSYS software. The current research object to carry on the numerical simulation and experimental study, aiming at finding an effective way to detection and the localization of cracks and holes defects in the main body of pipeline. Considering the damage form of multiple cracks and holes which may exist in pipeline, to determine the respective position in the steel pipe. In addition, the technique used in this research a guided lamb wave based structural health monitoring method whereas piezoelectric transducers will use as exciting and receiving sensors by Pitch-Catch method. Implementation of simple learning mechanism has been developed specially for the ANN for fuzzy the system represented.

  14. Natural gas and CO2 price variation: impact on the relative cost-efficiency of LNG and pipelines.

    PubMed

    Ulvestad, Marte; Overland, Indra

    2012-06-01

    THIS ARTICLE DEVELOPS A FORMAL MODEL FOR COMPARING THE COST STRUCTURE OF THE TWO MAIN TRANSPORT OPTIONS FOR NATURAL GAS: liquefied natural gas (LNG) and pipelines. In particular, it evaluates how variations in the prices of natural gas and greenhouse gas emissions affect the relative cost-efficiency of these two options. Natural gas is often promoted as the most environmentally friendly of all fossil fuels, and LNG as a modern and efficient way of transporting it. Some research has been carried out into the local environmental impact of LNG facilities, but almost none into aspects related to climate change. This paper concludes that at current price levels for natural gas and CO 2 emissions the distance from field to consumer and the volume of natural gas transported are the main determinants of transport costs. The pricing of natural gas and greenhouse emissions influence the relative cost-efficiency of LNG and pipeline transport, but only to a limited degree at current price levels. Because more energy is required for the LNG process (especially for fuelling the liquefaction process) than for pipelines at distances below 9100 km, LNG is more exposed to variability in the price of natural gas and greenhouse gas emissions up to this distance. If the prices of natural gas and/or greenhouse gas emission rise dramatically in the future, this will affect the choice between pipelines and LNG. Such a price increase will be favourable for pipelines relative to LNG.

  15. Natural gas and CO2 price variation: impact on the relative cost-efficiency of LNG and pipelines

    PubMed Central

    Ulvestad, Marte; Overland, Indra

    2012-01-01

    This article develops a formal model for comparing the cost structure of the two main transport options for natural gas: liquefied natural gas (LNG) and pipelines. In particular, it evaluates how variations in the prices of natural gas and greenhouse gas emissions affect the relative cost-efficiency of these two options. Natural gas is often promoted as the most environmentally friendly of all fossil fuels, and LNG as a modern and efficient way of transporting it. Some research has been carried out into the local environmental impact of LNG facilities, but almost none into aspects related to climate change. This paper concludes that at current price levels for natural gas and CO2 emissions the distance from field to consumer and the volume of natural gas transported are the main determinants of transport costs. The pricing of natural gas and greenhouse emissions influence the relative cost-efficiency of LNG and pipeline transport, but only to a limited degree at current price levels. Because more energy is required for the LNG process (especially for fuelling the liquefaction process) than for pipelines at distances below 9100 km, LNG is more exposed to variability in the price of natural gas and greenhouse gas emissions up to this distance. If the prices of natural gas and/or greenhouse gas emission rise dramatically in the future, this will affect the choice between pipelines and LNG. Such a price increase will be favourable for pipelines relative to LNG. PMID:24683269

  16. Real-time Monitoring of Subsea Gas Pipelines, Offshore Platforms, and Ship Inspection Scores Using an Automatic Identification System

    NASA Astrophysics Data System (ADS)

    Artana, K. B.; Pitana, T.; Dinariyana, D. P.; Ariana, M.; Kristianto, D.; Pratiwi, E.

    2018-06-01

    The aim of this research is to develop an algorithm and application that can perform real-time monitoring of the safety operation of offshore platforms and subsea gas pipelines as well as determine the need for ship inspection using data obtained from automatic identification system (AIS). The research also focuses on the integration of shipping database, AIS data, and others to develop a prototype for designing a real-time monitoring system of offshore platforms and pipelines. A simple concept is used in the development of this prototype, which is achieved by using an overlaying map that outlines the coordinates of the offshore platform and subsea gas pipeline with the ship's coordinates (longitude/latitude) as detected by AIS. Using such information, we can then build an early warning system (EWS) relayed through short message service (SMS), email, or other means when the ship enters the restricted and exclusion zone of platforms and pipelines. The ship inspection system is developed by combining several attributes. Then, decision analysis software is employed to prioritize the vessel's four attributes, including ship age, ship type, classification, and flag state. Results show that the EWS can increase the safety level of offshore platforms and pipelines, as well as the efficient use of patrol boats in monitoring the safety of the facilities. Meanwhile, ship inspection enables the port to prioritize the ship to be inspected in accordance with the priority ranking inspection score.

  17. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-10-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. During this first quarter of 2001, shredding of the feed material and final feed conditioning were completed. Pilot facility hydrolysis production was completed tomore » produce lignin for co-fire testing and the lignin fuel was washed and dewatered. Both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation and co-firing. EERC has received coal typical of the fuel to the TVA-Colbert boilers. This material will be used at EERC as baseline material and for mixing with the bio-fuel for combustion testing. EERC combustion testing of the bio-based fuels is scheduled to begin in October of 2001. The TVA-Colbert facility has neared completion of the task to evaluate co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system was completed. The cost estimate and the output and heat rate impacts will be used to determine a preliminary price for the exported steam.« less

  18. Installation Restoration Program. Phase 1. Records Search 15th ABW Satellite Installations, Hawaii

    DTIC Science & Technology

    1984-09-01

    Hickam POL Storage Facilities and Pipeline The POL storage facilities remotely located from Hickam Air Force Base (AFB...airfield with less activity than nearby Wheeler and Hickam Air Force Bases . Aircraft activity was significantly reduced in the late 1940’s and the...United States Air Force to conduct the Phase I Records Search at the 15th Air Base Wing 1-2 ES ENGINEERING-SCIENCE PHASE I PHASE 11 PHASE IV

  19. 2005 Tri-Service Infrastructure Systems Conference and Exhibition. Volume 13, Tracks 20, 21 and Workshop

    DTIC Science & Technology

    2005-08-04

    Dennis Mekkers and Daniel M. Katz Current Research in Fate Current Research in Fate & Transport of Chemical and Biological Contaminants in Water... Grafenwoehr Health/Dental Clinic 33U.S. Army Health Facility Planning Agency • $58M in Construction, $86M in Design • 23 Projects in Pipeline • HFPA...Troop Medical Clinic Grafenwoehr Health/Dental Clinic 38U.S. Army Health Facility Planning Agency Army “Medical BRAC” Projects Afghanistan -- CPT

  20. 36 CFR 251.53 - Authorities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... structures and facilities for recreation, public convenience, or safety; (ii) industrial or commercial purposes, and (iii) education or public activities; and (2) for not over 5 acres for summer homes and..., operation, maintenance, or termination of a pipeline or to protect the natural environment or public safety...

  1. 40 CFR 63.11085 - What are my general duties to minimize emissions?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission Limitations and Management Practices... control practices for minimizing emissions. Determination of whether such operation and maintenance... operation and maintenance records, and inspection of the source. (b) You must keep applicable records and...

  2. 40 CFR 63.11085 - What are my general duties to minimize emissions?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission Limitations and Management Practices... control practices for minimizing emissions. Determination of whether such operation and maintenance... operation and maintenance records, and inspection of the source. (b) You must keep applicable records and...

  3. 40 CFR 63.11085 - What are my general duties to minimize emissions?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities Emission Limitations and Management Practices... control practices for minimizing emissions. Determination of whether such operation and maintenance... operation and maintenance records, and inspection of the source. (b) You must keep applicable records and...

  4. Examination of Outside Forces Damage to Natural Gas Pipelines and Damage Prevention

    DOT National Transportation Integrated Search

    1987-07-01

    The report looks at the problem of damage to underground facilities caused by excavation and related activities and the efforts that have been made in recent years to limit and control it through laws, regulations, and damage prevention programs, suc...

  5. 49 CFR 192.613 - Continuing surveillance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Continuing surveillance. 192.613 Section 192.613... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.613 Continuing surveillance. (a) Each operator shall have a procedure for continuing surveillance of its facilities to determine and take...

  6. 49 CFR 192.613 - Continuing surveillance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Continuing surveillance. 192.613 Section 192.613... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.613 Continuing surveillance. (a) Each operator shall have a procedure for continuing surveillance of its facilities to determine and take...

  7. 49 CFR 192.613 - Continuing surveillance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Continuing surveillance. 192.613 Section 192.613... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.613 Continuing surveillance. (a) Each operator shall have a procedure for continuing surveillance of its facilities to determine and take...

  8. 49 CFR 192.613 - Continuing surveillance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Continuing surveillance. 192.613 Section 192.613... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.613 Continuing surveillance. (a) Each operator shall have a procedure for continuing surveillance of its facilities to determine and take...

  9. 49 CFR 192.613 - Continuing surveillance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Continuing surveillance. 192.613 Section 192.613... BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Operations § 192.613 Continuing surveillance. (a) Each operator shall have a procedure for continuing surveillance of its facilities to determine and take...

  10. 49 CFR 190.229 - Criminal penalties generally.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Criminal penalties generally. 190.229 Section 190... ENFORCEMENT AND REGULATORY PROCEDURES Enforcement Criminal Penalties § 190.229 Criminal penalties generally...) Subsequently damages a pipeline facility resulting in death, serious bodily harm, or property damage exceeding...

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The goal of this study is to provide a literature search and write a historical narrative of the cultural significance of the study area for the proposed WyCoalGas Inc., pipeline, railroad, well fields, and coal gasification plant. The request for a cultural resource investigation states at a minimum the study shall be a literature search on the narrow one mile corridor along the proposed pipelines, areas included within the various facilities plus a one mile buffer surrounding these facilities. In addition, the study must be tied into appropriate local, state, and national history. The writer of this history has feltmore » a responsibility for providing a realistic assessment of the themes of the study area's historical development. Several ideas have been concentrated upon: its American Indian heritage; the Euro-American's exploitive relationship with the region; and the overriding fragile, arid nature of its land. It is hoped that the government agencies and ultimately the energy company will feel a similiar responsibility toward the study area's historical integrity.« less

  12. Comparative assessment of water use and environmental implications of coal slurry pipelines

    USGS Publications Warehouse

    Palmer, Richard N.; James II, I. C.; Hirsch, R.M.

    1977-01-01

    With other studies conducted by the U.S. Geological Survey of water use in the conversion and transportation of the West 's coal, an analysis of water use and environmental implications of coal-slurry pipeline transport is presented. Simulations of a hypothetical slurry pipeline of 1000-mile length transporting 12.5 million tons per year indicate that pipeline costs and energy requirements are quite sensitive to the coal-to-water ratio. For realistic water prices, the optimal ratio will not vary far from the 50/50 ratio by weight. In comparison to other methods of energy conversion and transport, coal-slurry pipeline utilize about 1/3 the amount of water required for coal gasification, and about 1/5 the amount required for on-site electrical generation. An analysis of net energy output from operating alternative energy transportation systems for the assumed conditions indicates that both slurry pipeline and rail shipment require approximately 4.5 percent of the potential electrical energy output of the coal transported, and high-voltage, direct-current transportation requires approximately 6.5 percent. The environmental impacts of the different transports options are so substantially different that a common basis for comparison does not exist. (Woodard-USGS)

  13. The UCLan SDO Data Hub

    NASA Astrophysics Data System (ADS)

    Dalla, S.; Walsh, R. W.; Chapman, S. A.; Marsh, M.; Regnier, S.; Bewsher, D.; Brown, D. S.; Kelly, J.; Laitinen, T.; Alexander, C.

    2010-12-01

    A data pipeline for the distribution of SDO data products has been developed throughout a number of countries in the US, Europe and Asia. The UK node within this pipeline is at the University of Central Lancashire (UCLan), where a data center has been established to host a rolling AIA and HMI archive, aimed at supplying data to the country's large solar scientific community. This presentation will describe the hardware and software structures of the archive, as well as the best practice identified and feedback received from users of the facility. We will also discuss algorithms that are run locally in order to identify solar features and events.

  14. Methane Emissions from United States Natural Gas Gathering and Processing.

    PubMed

    Marchese, Anthony J; Vaughn, Timothy L; Zimmerle, Daniel J; Martinez, David M; Williams, Laurie L; Robinson, Allen L; Mitchell, Austin L; Subramanian, R; Tkacik, Daniel S; Roscioli, Joseph R; Herndon, Scott C

    2015-09-01

    New facility-level methane (CH4) emissions measurements obtained from 114 natural gas gathering facilities and 16 processing plants in 13 U.S. states were combined with facility counts obtained from state and national databases in a Monte Carlo simulation to estimate CH4 emissions from U.S. natural gas gathering and processing operations. Total annual CH4 emissions of 2421 (+245/-237) Gg were estimated for all U.S. gathering and processing operations, which represents a CH4 loss rate of 0.47% (±0.05%) when normalized by 2012 CH4 production. Over 90% of those emissions were attributed to normal operation of gathering facilities (1697 +189/-185 Gg) and processing plants (506 +55/-52 Gg), with the balance attributed to gathering pipelines and processing plant routine maintenance and upsets. The median CH4 emissions estimate for processing plants is a factor of 1.7 lower than the 2012 EPA Greenhouse Gas Inventory (GHGI) estimate, with the difference due largely to fewer reciprocating compressors, and a factor of 3.0 higher than that reported under the EPA Greenhouse Gas Reporting Program. Since gathering operations are currently embedded within the production segment of the EPA GHGI, direct comparison to our results is complicated. However, the study results suggest that CH4 emissions from gathering are substantially higher than the current EPA GHGI estimate and are equivalent to 30% of the total net CH4 emissions in the natural gas systems GHGI. Because CH4 emissions from most gathering facilities are not reported under the current rule and not all source categories are reported for processing plants, the total CH4 emissions from gathering and processing reported under the EPA GHGRP (180 Gg) represents only 14% of that tabulated in the EPA GHGI and 7% of that predicted from this study.

  15. 18 CFR 157.210 - Mainline natural gas facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Mainline natural gas... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR CERTIFICATES OF PUBLIC... GAS ACT Interstate Pipeline Blanket Certificates and Authorization Under Section 7 of the Natural Gas...

  16. 33 CFR 154.1130 - Requirements for prepositioned response equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...

  17. 33 CFR 154.1130 - Requirements for prepositioned response equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...

  18. 33 CFR 154.1130 - Requirements for prepositioned response equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...

  19. 33 CFR 155.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Additional response plan... Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act § 155.1125 Additional response plan requirements. (a) The owner or...

  20. 33 CFR 155.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Additional response plan... Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act § 155.1125 Additional response plan requirements. (a) The owner or...

  1. 33 CFR 154.1130 - Requirements for prepositioned response equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility...: (a) On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels... of a discharge. (c) On-water recovery equipment with a minimum effective daily recovery rate of 40...

  2. 33 CFR 155.1125 - Additional response plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Additional response plan... Additional Response Plan Requirements for Tankers Loading Cargo at a Facility Permitted Under the Trans-Alaska Pipeline Authorization Act § 155.1125 Additional response plan requirements. (a) The owner or...

  3. 7 CFR 1955.57 - Real property containing underground storage tanks.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; (3) Septic tanks; (4) Pipeline facilities (including gathering lines) regulated under; (i) The...) Storm water or wastewater collection systems; (7) Flow-through process tanks; (8) Liquid traps or... 7 Agriculture 14 2014-01-01 2014-01-01 false Real property containing underground storage tanks...

  4. 7 CFR 1955.57 - Real property containing underground storage tanks.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...; (3) Septic tanks; (4) Pipeline facilities (including gathering lines) regulated under; (i) The...) Storm water or wastewater collection systems; (7) Flow-through process tanks; (8) Liquid traps or... 7 Agriculture 14 2011-01-01 2011-01-01 false Real property containing underground storage tanks...

  5. 7 CFR 1955.57 - Real property containing underground storage tanks.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...; (3) Septic tanks; (4) Pipeline facilities (including gathering lines) regulated under; (i) The...) Storm water or wastewater collection systems; (7) Flow-through process tanks; (8) Liquid traps or... 7 Agriculture 14 2012-01-01 2012-01-01 false Real property containing underground storage tanks...

  6. 7 CFR 1955.57 - Real property containing underground storage tanks.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; (3) Septic tanks; (4) Pipeline facilities (including gathering lines) regulated under; (i) The...) Storm water or wastewater collection systems; (7) Flow-through process tanks; (8) Liquid traps or... 7 Agriculture 14 2013-01-01 2013-01-01 false Real property containing underground storage tanks...

  7. 7 CFR 1955.57 - Real property containing underground storage tanks.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; (3) Septic tanks; (4) Pipeline facilities (including gathering lines) regulated under; (i) The... 7 Agriculture 14 2010-01-01 2009-01-01 true Real property containing underground storage tanks... Property § 1955.57 Real property containing underground storage tanks. Within 30 days of acquisition of...

  8. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Federal contingency plans. 300.210...

  9. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Federal contingency plans. 300.210...

  10. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Federal contingency plans. 300.210...

  11. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Federal contingency plans. 300.210...

  12. 76 FR 28764 - Equitrans, L.P.; Notice of Availability of the Environmental Assessment for the Proposed Sunrise...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... interconnect sites (meter stations), 12 mainline block valves, 4 pig \\1\\ launchers/ receivers, 2 over-pipeline protection facilities, and 1 side tap valve setting; and \\1\\ A pig is an internal tool that can be used to...

  13. Relationship between Pipeline Wall Thickness (Gr. X60) and Water Depth towards Avoiding Failure during Installation

    NASA Astrophysics Data System (ADS)

    Razak, K. Abdul; Othman, M. I. H.; Mat Yusuf, S.; Fuad, M. F. I. Ahmad; yahaya, Effah

    2018-05-01

    Oil and gas today being developed at different water depth characterized as shallow, deep and ultra-deep waters. Among the major components involved during the offshore installation is pipelines. Pipelines are a transportation method of material through a pipe. In oil and gas industry, pipeline come from a bunch of line pipe that welded together to become a long pipeline and can be divided into two which is gas pipeline and oil pipeline. In order to perform pipeline installation, we need pipe laying barge or pipe laying vessel. However, pipe laying vessel can be divided into two types: S-lay vessel and J-lay vessel. The function of pipe lay vessel is not only to perform pipeline installation. It also performed installation of umbilical or electrical cables. In the simple words, pipe lay vessel is performing the installation of subsea in all the connecting infrastructures. Besides that, the installation processes of pipelines require special focus to make the installation succeed. For instance, the heavy pipelines may exceed the lay vessel’s tension capacities in certain kind of water depth. Pipeline have their own characteristic and we can group it or differentiate it by certain parameters such as grade of material, type of material, size of diameter, size of wall thickness and the strength. For instances, wall thickness parameter studies indicate that if use the higher steel grade of the pipelines will have a significant contribution in pipeline wall thickness reduction. When running the process of pipe lay, water depth is the most critical thing that we need to monitor and concern about because of course we cannot control the water depth but we can control the characteristic of the pipe like apply line pipe that have wall thickness suitable with current water depth in order to avoid failure during the installation. This research will analyse whether the pipeline parameter meet the requirements limit and minimum yield stress. It will overlook to simulate pipe grade API 5L X60 which size from 8 to 20mm thickness with a water depth of 50 to 300m. Result shown that pipeline installation will fail from the wall thickness of 18mm onwards since it has been passed the critical yield percentage.

  14. Optimizing the TESS Planet Finding Pipeline

    NASA Astrophysics Data System (ADS)

    Chitamitara, Aerbwong; Smith, Jeffrey C.; Tenenbaum, Peter; TESS Science Processing Operations Center

    2017-10-01

    The Transiting Exoplanet Survey Satellite (TESS) is a new NASA planet finding all-sky survey that will observe stars within 200 light years and 10-100 times brighter than that of the highly successful Kepler mission. TESS is expected to detect ~1000 planets smaller than Neptune and dozens of Earth size planets. As in the Kepler mission, the Science Processing Operations Center (SPOC) processing pipeline at NASA Ames Research center is tasked with calibrating the raw pixel data, generating systematic error corrected light curves and then detecting and validating transit signals. The Transiting Planet Search (TPS) component of the pipeline must be modified and tuned for the new data characteristics in TESS. For example, due to each sector being viewed for as little as 28 days, the pipeline will be identifying transiting planets based on a minimum of two transit signals rather than three, as in the Kepler mission. This may result in a significantly higher false positive rate. The study presented here is to measure the detection efficiency of the TESS pipeline using simulated data. Transiting planets identified by TPS are compared to transiting planets from the simulated transit model using the measured epochs, periods, transit durations and the expected detection statistic of injected transit signals (expected MES). From the comparisons, the recovery and false positive rates of TPS is measured. Measurements of recovery in TPS are then used to adjust TPS configuration parameters to maximize the planet recovery rate and minimize false detections. The improvements in recovery rate between initial TPS conditions and after various adjustments will be presented and discussed.

  15. Natural Gas Imports and Exports. Third Quarter Report 1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none

    1999-10-01

    The second quarter 1997 Quarterly Report of Natural Gas Imports and Exports featured a Quarterly Focus report on cross-border natural gas trade between the United States and Mexico. This Quarterly Focus article is a follow-up to the 1997 report. This report revisits and updates the status of some of the pipeline projects discussed in 1997, and examines a number of other planned cross-border pipeline facilities which were proposed subsequent to our 1997 report. A few of the existing and proposed pipelines are bidirectional and thus have the capability of serving either Mexico, or the United States, depending on market conditionsmore » and gas supply availability. These new projects, if completed, would greatly enhance the pipeline infrastructure on the U.S.-Mexico border and would increase gas pipeline throughput capacity for cross-border trade by more than 1 billion cubic feet (Bcf) per day. The Quarterly Focus is comprised of five sections. Section I includes the introduction as well as a brief historic overview of U.S./Mexican natural gas trade; a discussion of Mexico's energy regulatory structure; and a review of trade agreements and a 1992 legislative change which allows for her cross-border gas trade in North America. Section II looks at initiatives that have been taken by the Mexican Government since 1995to open its energy markets to greater competition and privatization. Section III reviews Mexican gas demand forecasts and looks at future opportunities for U.S. gas producers to supplement Mexico's indigenous supplies in order to meet the anticipated rapid growth in demand. Section IV examines the U.S.-Mexico natural gas trade in recent years. It also looks specifically at monthly import and export volumes and prices and identifies short-term trends in this trade. Finally, Section V reviews the existing and planned cross-border gas pipeline infrastructure. The section also specifically describes six planned pipelines intended to expand this pipeline network and their planned in-service dates.« less

  16. Planck 2015 results. II. Low Frequency Instrument data processings

    NASA Astrophysics Data System (ADS)

    Planck Collaboration; Ade, P. A. R.; Aghanim, N.; Ashdown, M.; Aumont, J.; Baccigalupi, C.; Ballardini, M.; Banday, A. J.; Barreiro, R. B.; Bartolo, N.; Basak, S.; Battaglia, P.; Battaner, E.; Benabed, K.; Benoît, A.; Benoit-Lévy, A.; Bernard, J.-P.; Bersanelli, M.; Bielewicz, P.; Bock, J. J.; Bonaldi, A.; Bonavera, L.; Bond, J. R.; Borrill, J.; Bouchet, F. R.; Bucher, M.; Burigana, C.; Butler, R. C.; Calabrese, E.; Cardoso, J.-F.; Castex, G.; Catalano, A.; Chamballu, A.; Christensen, P. R.; Colombi, S.; Colombo, L. P. L.; Crill, B. P.; Curto, A.; Cuttaia, F.; Danese, L.; Davies, R. D.; Davis, R. J.; de Bernardis, P.; de Rosa, A.; de Zotti, G.; Delabrouille, J.; Dickinson, C.; Diego, J. M.; Dole, H.; Donzelli, S.; Doré, O.; Douspis, M.; Ducout, A.; Dupac, X.; Efstathiou, G.; Elsner, F.; Enßlin, T. A.; Eriksen, H. K.; Fergusson, J.; Finelli, F.; Forni, O.; Frailis, M.; Franceschet, C.; Franceschi, E.; Frejsel, A.; Galeotta, S.; Galli, S.; Ganga, K.; Giard, M.; Giraud-Héraud, Y.; Gjerløw, E.; González-Nuevo, J.; Górski, K. M.; Gratton, S.; Gregorio, A.; Gruppuso, A.; Hansen, F. K.; Hanson, D.; Harrison, D. L.; Henrot-Versillé, S.; Herranz, D.; Hildebrandt, S. R.; Hivon, E.; Hobson, M.; Holmes, W. A.; Hornstrup, A.; Hovest, W.; Huffenberger, K. M.; Hurier, G.; Jaffe, A. H.; Jaffe, T. R.; Juvela, M.; Keihänen, E.; Keskitalo, R.; Kiiveri, K.; Kisner, T. S.; Knoche, J.; Krachmalnicoff, N.; Kunz, M.; Kurki-Suonio, H.; Lagache, G.; Lähteenmäki, A.; Lamarre, J.-M.; Lasenby, A.; Lattanzi, M.; Lawrence, C. R.; Leahy, J. P.; Leonardi, R.; Lesgourgues, J.; Levrier, F.; Liguori, M.; Lilje, P. B.; Linden-Vørnle, M.; Lindholm, V.; López-Caniego, M.; Lubin, P. M.; Macías-Pérez, J. F.; Maggio, G.; Maino, D.; Mandolesi, N.; Mangilli, A.; Maris, M.; Martin, P. G.; Martínez-González, E.; Masi, S.; Matarrese, S.; Mazzotta, P.; McGehee, P.; Meinhold, P. R.; Melchiorri, A.; Mendes, L.; Mennella, A.; Migliaccio, M.; Mitra, S.; Montier, L.; Morgante, G.; Morisset, N.; Mortlock, D.; Moss, A.; Munshi, D.; Murphy, J. A.; Naselsky, P.; Nati, F.; Natoli, P.; Netterfield, C. B.; Nørgaard-Nielsen, H. U.; Novikov, D.; Novikov, I.; Oppermann, N.; Paci, F.; Pagano, L.; Paoletti, D.; Partridge, B.; Pasian, F.; Patanchon, G.; Pearson, T. J.; Peel, M.; Perdereau, O.; Perotto, L.; Perrotta, F.; Pettorino, V.; Piacentini, F.; Pierpaoli, E.; Pietrobon, D.; Pointecouteau, E.; Polenta, G.; Pratt, G. W.; Prézeau, G.; Prunet, S.; Puget, J.-L.; Rachen, J. P.; Rebolo, R.; Reinecke, M.; Remazeilles, M.; Renzi, A.; Rocha, G.; Romelli, E.; Rosset, C.; Rossetti, M.; Roudier, G.; Rubiño-Martín, J. A.; Rusholme, B.; Sandri, M.; Santos, D.; Savelainen, M.; Scott, D.; Seiffert, M. D.; Shellard, E. P. S.; Spencer, L. D.; Stolyarov, V.; Sutton, D.; Suur-Uski, A.-S.; Sygnet, J.-F.; Tauber, J. A.; Tavagnacco, D.; Terenzi, L.; Toffolatti, L.; Tomasi, M.; Tristram, M.; Tucci, M.; Tuovinen, J.; Türler, M.; Umana, G.; Valenziano, L.; Valiviita, J.; Van Tent, B.; Vassallo, T.; Vielva, P.; Villa, F.; Wade, L. A.; Wandelt, B. D.; Watson, R.; Wehus, I. K.; Wilkinson, A.; Yvon, D.; Zacchei, A.; Zonca, A.

    2016-09-01

    We present an updated description of the Planck Low Frequency Instrument (LFI) data processing pipeline, associated with the 2015 data release. We point out the places where our results and methods have remained unchanged since the 2013 paper and we highlight the changes made for the 2015 release, describing the products (especially timelines) and the ways in which they were obtained. We demonstrate that the pipeline is self-consistent (principally based on simulations) and report all null tests. For the first time, we present LFI maps in Stokes Q and U polarization. We refer to other related papers where more detailed descriptions of the LFI data processing pipeline may be found if needed.

  17. 77 FR 10666 - Pipeline Safety: Post Accident Drug and Alcohol Testing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... operators of Liquefied Natural Gas (LNG) facilities to conduct post- accident drug and alcohol tests of... reviewed, along with other applicable sections of Part 199: Under Sec. 199.105, post-accident drug tests of... administering the test. Covered employees must remain available for post-accident testing, but emergency...

  18. 76 FR 63915 - DCP Midstream, LP; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... application pursuant to Section 7(c) of the Natural Gas Act and Part 157 of the Commission's Regulations, for... diameter pipeline (the LaSalle Residue Line) connecting DCP's new non-jurisdictional natural gas processing... non-jurisdictional gas gathering company having facilities in Texas, Oklahoma, New Mexico, Louisiana...

  19. Experimental Verification of Pneumatic Transport System for the Rapid Excavation of Tunnels: Part 1. Installation of Test Facility

    DOT National Transportation Integrated Search

    1978-03-01

    This report deals with the selection of a test site, the design of a test installation, equipment selection, the installation and start-up of a pneumatic pipeline system for the transportation of tunnel muck. A review of prior pneumatic applications ...

  20. 49 CFR 191.23 - Reporting safety-related conditions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., controls, or processes gas or LNG. (4) Any material defect or physical damage that impairs the... strength. (5) Any malfunction or operating error that causes the pressure of a pipeline or LNG facility... structural integrity of an LNG storage tank. (8) Any safety-related condition that could lead to an imminent...

Top