Appalachian Stream Mitigation Workshop
A 5 day workshop in 2011 developed for state and federal regulatory and resource agencies, who review, comment on and/or approve compensatory mitigation plans for surface coal mining projects in Appalachia
Wetland Mitigation Monitoring at the Fernald Preserve - 13200
DOE Office of Scientific and Technical Information (OSTI.GOV)
Powell, Jane; Bien, Stephanie; Decker, Ashlee
The U.S. Department of Energy is responsible for 7.2 hectares (17.8 acres) of mitigation wetland at the Fernald Preserve, Ohio. Remedial activities affected the wetlands, and mitigation plans were incorporated into site-wide ecological restoration planning. In 2008, the Fernald Natural Resource Trustees developed a comprehensive wetland mitigation monitoring approach to evaluate whether compensatory mitigation requirements have been met. The Fernald Preserve Wetland Mitigation Monitoring Plan provided a guideline for wetland evaluations. The Ohio Environmental Protection Agency (Ohio EPA) wetland mitigation monitoring protocols were adopted as the means for compensatory wetland evaluation. Design, hydrologic regime, vegetation, wildlife, and biogeochemistry were evaluatedmore » from 2009 to 2011. Evaluations showed mixed results when compared to the Ohio EPA performance standards. Results of vegetation monitoring varied, with the best results occurring in wetlands adjacent to forested areas. Amphibians, particularly ambystomatid salamanders, were observed in two areas adjacent to forested areas. Not all wetlands met vegetation performance standards and amphibian biodiversity metrics. However, Fernald mitigation wetlands showed substantially higher ratings compared to other mitigated wetlands in Ohio. Also, soil sampling results remain consistent with other Ohio mitigated wetlands. The performance standards are not intended to be 'pass/fail' criteria; rather, they are reference points for use in making decisions regarding future monitoring and maintenance. The Trustees approved the Fernald Preserve Wetland Mitigation Monitoring Report with the provision that long-term monitoring of the wetlands continues at the Fernald Preserve. (authors)« less
DOT National Transportation Integrated Search
2014-08-01
Transportation agencies do their best to avoid : and minimize any impacts to the environment, : but some impacts are unavoidable. : Compensatory mitigation is used to offset these : unavoidable impacts to the environment. Over : $3.3 billion is spent...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
Compensatory Mitigation Rule Q&A
What is compensatory mitigation? How is compensatory mitigation accomplished? What does this final rule do? What are the most significant changes required by this rule compared to previous mitigation practices? What are the goals of the final rule?
Compensatory Mitigation Rule Draft Environmental Assessment
Draft Compensatory Mitigation Rule intended to promote regulatory efficiency by establishing standards and criteria that would apply to compensatory mitigation required for DA permits issued under Section 404 of the Clean Water Act.
IDF Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durham, Robin E.; Sackschewsky, Michael R.
This document provides a review and status of activities conducted in support of the CH2MHill Hanford Group (CHG) Compensatory Mitigation Implementation Plan (MIP) for the Integrated Disposal Facility (IDF). It includes time-zero monitoring results for planting activities conducted in December 2007, annual survival monitoring for all planting years, a summary of artificial burrow observations, and recommendations for the successful completion of DOE mitigation commitments for this project.
Compensatory Mitigation Rule Factsheet
A two page fact sheet developed by EPA for the public to reinforce the requirements under the 2008 Compensatory Mitigation Rule to adhere to the “mitigation sequence” of “avoid, minimize and compensate”.
Compensatory Mitigation Rule Final Environmental Assessment
EA performed to determine the costs resulting from implementation of the Compensatory Mitigation Rule and the extent to which the rule changes aggregate mitigation costs borne by permittees and Corps administrative burdens and associated costs.
Compensatory Mitigation for Losses of Aquatic Resources; Final Rule
These regulations are designed to improve the effectiveness of compensatory mitigation to replace lost aquatic resource functions and area, and increase the efficiency and predictability of the mitigation project review process.
Compensatory Mitigation Factsheet
For unavoidable impacts to wetlands, streams and other aquatic resources from authorized discharges of dredged or fill material, compensatory mitigation is required to replace the loss of wetland and aquatic resource functions in the watershed.
DOT National Transportation Integrated Search
2012-03-01
Phase 1 of this study evaluated 50 NCDOT wetland compensatory mitigation sites and 11 reference sites in 1999. The : Phase 2 component (this report) examines five of the compensatory mitigation sites to provide a more in-depth analysis. The : objecti...
Background on 2008 Compensatory Mitigation Rulemaking
In 2008 EPA and the Corps issued revised regulations governing compensatory mitigation for authorized impacts to wetlands, streams, and other waters of the U.S. under Section 404 of the Clean Water Act.
2008 Compensatory Mitigation Rule: General Requirements
Compensatory mitigation involves actions taken to offset unavoidable adverse impacts to wetlands, streams and other aquatic resources authorized by Clean Water Act section 404 permits and other Department of the Army (DA) permits
Handbook on Coral Reef Impacts: Avoidance, Minimization, Compensatory Mitigation, and Restoration
This Handbook provides a general summary of current avoidance, minimization, compensatory mitigation, and restoration strategies that may help address physical damage resulting from direct adverse impacts to coral reefs.
Compensatory Mitigation Site Protection Instrument Handbook and Fact Sheet
The site protection instrument is a written description of the legal arrangements including site ownership, management, and enforcement of any use restrictions that will be used to ensure the long-term protection of the compensatory mitigation project site
Federal Register Notice Compensatory Mitigation Rule
EPA and the U.S. Army Corps of Engineers (the Corps) announced proposed revisions to regulations governing compensatory mitigation for authorized impacts to wetlands, streams, and other waters of the U.S. under Section 404 of the Clean Water Act.
An Assessment Framework for Making Compensatory Mitigation Determinations in California
Efficient gathering and use of assessment information will improve the ecological effectiveness of compensatory mitigation. It also will make for more efficient regulatory decision-making. Recognizing these facts, the California Water Board worked in collaboration with the USEPA...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vavrinec, John; Borde, Amy B.; Woodruff, Dana L.
Unites States Navy capital improvement projects are designed to modernize and improve mission capacity. Such capital improvement projects often result in unavoidable environmental impacts by increasing over-water structures, which results in a loss of subtidal habitat within industrial areas of Navy bases. In the Pacific Northwest, compensatory mitigation often targets alleviating impacts to Endangered Species Act-listed salmon species. The complexity of restoring large systems requires limited resources to target successful and more coordinated mitigation efforts to address habitat loss and improvements in water quality that will clearly contribute to an improvement at the site scale and can then be linkedmore » to a cumulative net ecosystem improvement.« less
2008-09-01
compensatory mitigation. However, a variety of other potential uses have been identified, including the determination of minimal effects under the Food...at http://www.epa.gov/OWOW/wetlands/science/hgm.html, outlines a strategy for developing Regional Guidebooks throughout the United States, provides...determination of compensatory mitigation, design and monitoring of mitigation, comparison of wetland management alternatives or results, determination of
To meet the goals of the U.S. federal Clean Water Act (CWA) and Oregon’s Removal-Fill (R-F) Law, unavoidable impacts to jurisdictional waters, including streams and rivers, must be compensated for through compensatory mitigation under the CWA Section 404 and R-F permitting ...
Federal Guidance for the Establishment, Use and Operation of Mitigation Banks
Policy guidance for the establishment, use and operation of mitigation banks for the purpose of providing compensatory mitigation for authorized adverse impacts to wetlands and other aquatic resources.
Model Operational Guidelines for Creating or Restoring Wetlands that are Ecologically Self-Sustaining for aquatic resource impacts. Guidelines for identifying the basic requirements for mitigation success and assist in mitigation site selection.
U.S. Army Corps of Engineers and EPA report summarizing the progress made in implementing the 2008 Mitigation Rule, including analysis of trends in aquatic resource impacts and compensation from 2010 through 2014.
Development by Design: Mitigating Wind Development's Impacts on Wildlife in Kansas
Obermeyer, Brian; Manes, Robert; Kiesecker, Joseph; Fargione, Joseph; Sochi, Kei
2011-01-01
Wind energy, if improperly sited, can impact wildlife through direct mortality and habitat loss and fragmentation, in contrast to its environmental benefits in the areas of greenhouse gas, air quality, and water quality. Fortunately, risks to wildlife from wind energy may be alleviated through proper siting and mitigation offsets. Here we identify areas in Kansas where wind development is incompatible with conservation, areas where wind development may proceed but with compensatory mitigation for impacts, and areas where development could proceed without the need for compensatory mitigation. We demonstrate that approximately 10.3 million ha in Kansas (48 percent of the state) has the potential to provide 478 GW of installed capacity while still meeting conservation goals. Of this total, approximately 2.7 million ha would require no compensatory mitigation and could produce up to 125 GW of installed capacity. This is 1,648 percent higher than the level of wind development needed in Kansas by 2030 if the United States is to get 20 percent of its electricity from wind. Projects that avoid and offset impacts consistent with this analysis could be awarded “Green Certification.” Certification may help to expand and sustain the wind industry by facilitating the completion of individual projects sited to avoid sensitive areas and protecting the industry's reputation as an ecologically friendly source of electricity. PMID:22046333
DOT National Transportation Integrated Search
2000-07-01
In this study, 49 North Carolina Department of Transportation (NCDOT) wetland compensatory mitigation sites and 11 reference sites were evaluated on-site in 1999. Seventeen of the larger sites consisted of more than one type of mitigation (restoratio...
2002 Mitigation Regulatory Guidance Letter (RGL) 02-2
Guidance on Compensatory Mitigation Projects for Aquatic Resource Impacts Under the Corps Regulatory Program Pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act of 1899
Transportation Equity Act for the 21st Century (TEA-21) Guidance (Federal Highway Administration)
This document from July 11, 2003 provides interagency guidance on applying the preference for wetlands mitigation banking mandated in TEA-21 to compensatory mitigation requirements under Section 404 of the Clean Water Act (CWA).
A currency for offsetting energy development impacts: horse-trading sage-grouse on the open market.
Doherty, Kevin E; Naugle, David E; Evans, Jeffrey S
2010-04-28
Biodiversity offsets provide a mechanism to compensate for unavoidable damages from new energy development as the U.S. increases its domestic production. Proponents argue that offsets provide a partial solution for funding conservation while opponents contend the practice is flawed because offsets are negotiated without the science necessary to backup resulting decisions. Missing in negotiations is a biologically-based currency for estimating sufficiency of offsets and a framework for applying proceeds to maximize conservation benefits. Here we quantify a common currency for offsets for greater sage-grouse (Centrocercus urophasianus) by estimating number of impacted birds at 4 levels of development commonly permitted. Impacts were indiscernible at 1-12 wells per 32.2 km(2). Above this threshold lek losses were 2-5 times greater inside than outside of development and bird abundance at remaining leks declined by -32 to -77%. Findings reiterated the importance of time-lags as evidenced by greater impacts 4 years after initial development. Clustering well locations enabled a few small leks to remain active inside of developments. Documented impacts relative to development intensity can be used to forecast biological trade-offs of newly proposed or ongoing developments, and when drilling is approved, anticipated bird declines form the biological currency for negotiating offsets. Monetary costs for offsets will be determined by true conservation cost to mitigate risks such as sagebrush tillage to other populations of equal or greater number. If this information is blended with landscape level conservation planning, the mitigation hierarchy can be improved by steering planned developments away from conservation priorities, ensuring compensatory mitigation projects deliver a higher return for conservation that equate to an equal number of birds in the highest priority areas, provide on-site mitigation recommendations, and provide a biologically based cost for mitigating unavoidable impacts.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., and how locations and types of compensatory mitigation projects address those needs. A landscape... authorized by DA permits. The watershed approach may involve consideration of landscape scale, historic and...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., and how locations and types of compensatory mitigation projects address those needs. A landscape... authorized by DA permits. The watershed approach may involve consideration of landscape scale, historic and...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., and how locations and types of compensatory mitigation projects address those needs. A landscape... authorized by DA permits. The watershed approach may involve consideration of landscape scale, historic and...
Code of Federal Regulations, 2010 CFR
2010-04-01
... substances into organic matter and recycled on a continuing basis. Compensatory mitigation means restoration... normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil...
Code of Federal Regulations, 2011 CFR
2011-04-01
... substances into organic matter and recycled on a continuing basis. Compensatory mitigation means restoration... normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil...
Code of Federal Regulations, 2012 CFR
2012-04-01
... substances into organic matter and recycled on a continuing basis. Compensatory mitigation means restoration... normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil...
Code of Federal Regulations, 2013 CFR
2013-04-01
... substances into organic matter and recycled on a continuing basis. Compensatory mitigation means restoration... normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil...
Code of Federal Regulations, 2014 CFR
2014-04-01
... substances into organic matter and recycled on a continuing basis. Compensatory mitigation means restoration... normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil...
33 CFR 332.3 - General compensatory mitigation requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... wetland maps; soil surveys; U.S. Geological Survey topographic and hydrologic maps; aerial photographs... appropriate quantitative assessment tools, where available; (iii) Preservation is determined by the district...
33 CFR 332.3 - General compensatory mitigation requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... wetland maps; soil surveys; U.S. Geological Survey topographic and hydrologic maps; aerial photographs... appropriate quantitative assessment tools, where available; (iii) Preservation is determined by the district...
33 CFR 332.3 - General compensatory mitigation requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... wetland maps; soil surveys; U.S. Geological Survey topographic and hydrologic maps; aerial photographs... appropriate quantitative assessment tools, where available; (iii) Preservation is determined by the district...
33 CFR 332.3 - General compensatory mitigation requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... wetland maps; soil surveys; U.S. Geological Survey topographic and hydrologic maps; aerial photographs... appropriate quantitative assessment tools, where available; (iii) Preservation is determined by the district...
33 CFR 332.3 - General compensatory mitigation requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... wetland maps; soil surveys; U.S. Geological Survey topographic and hydrologic maps; aerial photographs... appropriate quantitative assessment tools, where available; (iii) Preservation is determined by the district...
COMPENSATORY EDUCATION PROGRAM. NEWSLETTER.
ERIC Educational Resources Information Center
Fresno City Unified School District, CA.
TWO NEWSLETTERS FROM THE COMPENSATORY EDUCATION PROGRAM IN FRESNO INCLUDED PLANS FOR THE PLANNING GRANT PROGRAM, THE BASIC PROGRAM, AND THE INTENSIVE PROGRAM. THE BASIC PROGRAM SHOULD REDUCE PUPIL-TEACHER RATIO, PROVIDE PRESCHOOL PROJECTS THROUGH THE USE OF EITHER SCHOOL FACILITIES OR PRIVATE FACILITIES, PROVIDE REMEDIAL AND CORRECTIVE PROGRAMS IN…
40 CFR 230.93 - General compensatory mitigation requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... available from sources such as wetland maps; soil surveys; U.S. Geological Survey topographic and hydrologic... the watershed, the district engineer must use appropriate quantitative assessment tools, where...
40 CFR 230.93 - General compensatory mitigation requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... available from sources such as wetland maps; soil surveys; U.S. Geological Survey topographic and hydrologic... the watershed, the district engineer must use appropriate quantitative assessment tools, where...
40 CFR 230.93 - General compensatory mitigation requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... available from sources such as wetland maps; soil surveys; U.S. Geological Survey topographic and hydrologic... the watershed, the district engineer must use appropriate quantitative assessment tools, where...
40 CFR 230.93 - General compensatory mitigation requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... available from sources such as wetland maps; soil surveys; U.S. Geological Survey topographic and hydrologic... the watershed, the district engineer must use appropriate quantitative assessment tools, where...
40 CFR 230.93 - General compensatory mitigation requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... available from sources such as wetland maps; soil surveys; U.S. Geological Survey topographic and hydrologic... the watershed, the district engineer must use appropriate quantitative assessment tools, where...
Research Plan: Compensatory Education Study.
ERIC Educational Resources Information Center
National Inst. of Education (DHEW), Washington, DC.
This research plan is a direct response to the education Amendments of 1974 which instructs the National Institute of Education to design and conduct a compensatory education study. The research design, as outlined in this report, intends to examine programs and look for identifiable factors in funding, organization, and instructional methods…
Jurisdictional roadside ditches.
DOT National Transportation Integrated Search
2015-06-01
Section 404 of the Clean Water Act (CWA) mandates that state agencies and other entities perform compensatory mitigation when : their activities impair jurisdictional waters. In the Commonwealth of Kentucky, the Kentucky Transportation Cabinet (KYTC)...
Conservation of marine megafauna through minimization of fisheries bycatch.
Žydelis, Ramūnas; Wallace, Bryan P; Gilman, Eric L; Werner, Timothy B
2009-06-01
Many populations of marine megafauna, including seabirds, sea turtles, marine mammals, and elasmobranchs, have declined in recent decades due largely to anthropogenic mortality. To successfully conserve these long-lived animals, efforts must be prioritized according to feasibility and the degree to which they address threats with the highest relative impacts on population dynamics. Recently, Wilcox and Donlan (2007, Frontiers in Ecology and the Environment) and Donlan and Wilcox (2008, Biological Invasions) proposed a conservation strategy of "compensatory mitigation" in which fishing industries offset bycatch of seabirds and sea turtles by funding eradication of invasive mammalian predators from the terrestrial reproductive sites of these marine animals. Although this is a creative and conceptually compelling approach, we find it flawed as a conservation tool because it has narrow applicability among marine megafauna, it does not address the most pervasive threats to marine megafauna, and it is logistically and financially infeasible. Invasive predator eradication does not adequately offset the most pressing threat to most marine megafauna populations--fisheries bycatch. For seabird populations, fisheries bycatch and invasive predators infrequently are overlapping threats. Invasive predators have limited population-level impacts on sea turtles and marine mammals and no impacts on elasmobranchs, all of which are threatened by bycatch. Implementing compensatory mitigation in marine fisheries is unrealistic due to inadequate monitoring, control, and surveillance in the majority of fleets. Therefore, offsetting fisheries bycatch with eradication of invasive predators would be less likely to reverse population declines than reducing bycatch. We recommend that efforts to mitigate bycatch in marine capture fisheries should address multiple threats to sensitive bycatch species groups, but these efforts should first institute proven bycatch avoidance and reduction methods before considering compensatory mitigation. ©2009 Society for Conservation Biology.
Fergusson, David M; Vitaro, Frank; Wanner, Brigitte; Brendgen, Mara
2007-02-01
This study examined factors that could moderate or compensate the link between exposure to deviant friends and delinquent behaviours in a sample of 265 early adolescents. The putative moderating or compensatory factors referred to the behavioural domain (i.e. novelty seeking, harm avoidance), the biological domain (i.e. physical maturation), the sociofamily domain (i.e. sociofamily adversity, parental practices), the school domain (i.e. academic performance), and the social domain (i.e. peer acceptance). A series of regression analyses showed that novelty seeking and puberty status moderated the link between friends' self-reported delinquency and participants' self-reported delinquency. In addition, all the factors except peer acceptance also had main effects that, cumulatively, reduced the association between friends' delinquency and self-rated delinquency through compensatory main effects. These results are discussed in light of the differential roles of moderating and of compensatory factors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... RULES AND REGULATIONS, SECURITIES ACT OF 1933 Regulation E-Exemption for Securities of Small Business... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Exemption for offers and sales of securities pursuant to certain compensatory benefit plans and contracts relating to compensation...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., the activity causing the authorized impacts. (b) Sustainability. Compensatory mitigation projects... sustainability. Where active long-term management and maintenance are necessary to ensure long-term sustainability (e.g., prescribed burning, invasive species control, maintenance of water control structures...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., the activity causing the authorized impacts. (b) Sustainability. Compensatory mitigation projects... sustainability. Where active long-term management and maintenance are necessary to ensure long-term sustainability (e.g., prescribed burning, invasive species control, maintenance of water control structures...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., the activity causing the authorized impacts. (b) Sustainability. Compensatory mitigation projects... sustainability. Where active long-term management and maintenance are necessary to ensure long-term sustainability (e.g., prescribed burning, invasive species control, maintenance of water control structures...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., the activity causing the authorized impacts. (b) Sustainability. Compensatory mitigation projects... sustainability. Where active long-term management and maintenance are necessary to ensure long-term sustainability (e.g., prescribed burning, invasive species control, maintenance of water control structures...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., the activity causing the authorized impacts. (b) Sustainability. Compensatory mitigation projects... sustainability. Where active long-term management and maintenance are necessary to ensure long-term sustainability (e.g., prescribed burning, invasive species control, maintenance of water control structures...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., the activity causing the authorized impacts. (b) Sustainability. Compensatory mitigation projects... sustainability. Where active long-term management and maintenance are necessary to ensure long-term sustainability (e.g., prescribed burning, invasive species control, maintenance of water control structures...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., the activity causing the authorized impacts. (b) Sustainability. Compensatory mitigation projects... sustainability. Where active long-term management and maintenance are necessary to ensure long-term sustainability (e.g., prescribed burning, invasive species control, maintenance of water control structures...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., the activity causing the authorized impacts. (b) Sustainability. Compensatory mitigation projects... sustainability. Where active long-term management and maintenance are necessary to ensure long-term sustainability (e.g., prescribed burning, invasive species control, maintenance of water control structures...
A Currency for Offsetting Energy Development Impacts: Horse-Trading Sage-Grouse on the Open Market
Doherty, Kevin E.; Naugle, David E.; Evans, Jeffrey S.
2010-01-01
Background Biodiversity offsets provide a mechanism to compensate for unavoidable damages from new energy development as the U.S. increases its domestic production. Proponents argue that offsets provide a partial solution for funding conservation while opponents contend the practice is flawed because offsets are negotiated without the science necessary to backup resulting decisions. Missing in negotiations is a biologically-based currency for estimating sufficiency of offsets and a framework for applying proceeds to maximize conservation benefits. Methodology/Principal Findings Here we quantify a common currency for offsets for greater sage-grouse (Centrocercus urophasianus) by estimating number of impacted birds at 4 levels of development commonly permitted. Impacts were indiscernible at 1–12 wells per 32.2 km2. Above this threshold lek losses were 2–5 times greater inside than outside of development and bird abundance at remaining leks declined by −32 to −77%. Findings reiterated the importance of time-lags as evidenced by greater impacts 4 years after initial development. Clustering well locations enabled a few small leks to remain active inside of developments. Conclusions/Significance Documented impacts relative to development intensity can be used to forecast biological trade-offs of newly proposed or ongoing developments, and when drilling is approved, anticipated bird declines form the biological currency for negotiating offsets. Monetary costs for offsets will be determined by true conservation cost to mitigate risks such as sagebrush tillage to other populations of equal or greater number. If this information is blended with landscape level conservation planning, the mitigation hierarchy can be improved by steering planned developments away from conservation priorities, ensuring compensatory mitigation projects deliver a higher return for conservation that equate to an equal number of birds in the highest priority areas, provide on-site mitigation recommendations, and provide a biologically based cost for mitigating unavoidable impacts. PMID:20442770
Code of Federal Regulations, 2011 CFR
2011-07-01
... an upland, wetland, and/or riparian area that protects and/or enhances aquatic resource functions associated with wetlands, rivers, streams, lakes, marine, and estuarine systems from disturbances associated with adjacent land uses. Compensatory mitigation means the restoration (re-establishment or...
EVOLUTIONARY AND ECOLOGICAL EFFECTS OF MULTIGENERATIONAL EXPOSURES TO ANTHROPOGENIC STRESSORS
Biological and ecological responses to stress are dictated by duration and frequency, as well as instantaneous magnitude. Conditional compensatory responses at the physiological and behavioral levels, referred to as ?acclimation', may mitigate effects on individuals experiencing ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... following terms are defined: Adaptive management means the development of a management strategy that... guides modification of those projects to optimize performance. It includes the selection of appropriate... monitoring results to identify potential problems of a compensatory mitigation project and the identification...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Macintosh, Andrew, E-mail: andrew.macintosh@anu.edu.au; Waugh, Lauren
Concerns about the effectiveness of environmental impact assessment (EIA) have prompted proposals to improve its performance by limiting the discretion of decision-makers in screening. To investigate whether such proposals are likely to generate the desired results, we conducted an evaluation of the screening process under the Australian government's EIA regime from its introduction on 16 July 2000 to 30 June 2013 (study period). Almost 1 in 5 ‘particular manner’ decisions—a type of screening decision under the regime—were found to be unlawful. The extent of non-compliance is explained on the basis of convenience. The department was required to assess a largemore » number of projects under tight timeframes and with limited resources, while being pressured by proponents to allow their projects to bypass EIA. These pressures resulted in the development of an informal custom whereby the formal compensatory mitigation restrictions were frequently ignored. The results highlight the relative significance of formal and informal institutions in EIA. Formal EIA rules typically provide a mere outline of the process. The informal institutions adopted by administrators often have a greater influence on how the process operates and what it achieves. - Highlights: • Concerns about the effectiveness of environmental impact assessment (EIA) have prompted proposals to improve its performance by limiting the discretion of decision-makers in screening. • To investigate whether such proposals are likely to generate the desired results, we conducted an evaluation of the Australian government's screening process, looking at the extent of compliance with a formal prohibition on the consideration of compensatory mitigation. • Almost 1 in 5 ‘particular manner’ decisions – a type of screening decision under the regime – were found to be unlawful (with a 95% confidence interval of between 1:4 and 1:7) because of a failure to abide by the compensatory mitigation restrictions. For urban development actions, the ratio between lawful and unlawful particular manner decisions was worse than 1:1. • The extent of non-compliance is explained on the basis of convenience. Budget and interest group pressures resulted in the development of an informal custom whereby the formal compensatory mitigation restrictions were ignored. • The results highlight the relative significance of formal and informal institutions in EIA. Formal EIA rules typically provide a mere outline of the process. The informal institutions adopted by administrators often have a greater influence on how the process operates and what it achieves.« less
NASA Astrophysics Data System (ADS)
Singh, J.; Doyle, M.; Lave, R.; Robertson, M.
2015-12-01
Stream restoration is increasingly driven by compensatory mitigation; impacts to streams associated with typical land development activities must be offset via restoration of streams elsewhere. This policy creates an environment where restored stream 'credits' are traded under market-like conditions, comparable to wetland mitigation, carbon offsets, or endangered species habitat banking. The effect of mitigation on restoration design and construction is unknown. We use geomorphic surveys to quantify the differences between restored and nonrestored streams, and the difference between streams restored for market purposes (compensatory mitigation) from those restored for nonmarket programs. Physical study sites are located in the state of North Carolina, USA. We also analyze the social and political-economic drivers of the stream restoration and mitigation industry using analysis of policy documents and interviews with key personnel including regulators, mitigation bankers, stream designers, and scientists. Restored streams are typically wider, shallower and geomorphically more homogeneous than nonrestored streams. For example, nonrestored streams are typically characterized by more than an order of magnitude variability in radius of curvature and meander wavelength within a single study reach. By contrast, the radius of curvature in many restored streams does not vary for nearly the entire project reach. Streams restored for the mitigation market are typically headwater streams and part of a large, complex of long restored main channels, and many restored tributaries; streams restored for nonmarket purposes are typically shorter and consist of the main channel only. Interviews reveal that social forces shape the morphology of restored streams. Designers integrate many influences including economic and regulatory constraints, but traditions of practice have a large influence as well. Home to a fairly mature stream mitigation banking market, North Carolina can provide lessons for other states or countries with younger mitigation banking programs (e.g., Oregon and Montana) as well as places considering their introduction.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chang, Y. -S.; Kotamarthi, R.; Hartmann, H. M.
The San Luis Valley (SLV)–Taos Plateau study area in south-central Colorado and north-central New Mexico is a large alpine valley surrounded by mountains with an area of approximately 6,263,000 acres (25,345 km 2) (Figure ES.1-1). This area receives ample sunshine throughout the year, making it an ideal location for solar energy generation, and there are currently five photovoltaic facilities operating on private lands in the SLV, ranging in capacity from 1 to 30 megawatt (MW). In 2012 the Bureau of Land Management (BLM) launched its Solar Energy Program, which included the identification of four solar energy zones (SEZs) in themore » SLV totaling 16,308 acres (66 km 2), as well as over 50,000 (202 km 2) acres of other BLM-administered lands potentially available for application for solar development. The SEZ areas, named Antonito Southeast, De Tilla Gulch, Fourmile East, and Los Mogotes East, were defined by the BLM as areas well-suited for utility-scale (i.e., larger than 20 MW) production of solar energy where solar energy development would be prioritized (BLM 2012). Nonetheless, it was recognized that solar development in the SEZs would result in some unavoidable adverse impacts, and so the BLM initiated a solar regional mitigation strategy (SRMS) study for three of the SEZs (BLM and Argonne 2016). The SRMS is designed to identify residual impacts of solar development in the SEZs (that is, those that cannot be avoided or minimized onsite), identify those residual impacts that warrant compensatory mitigation when considering the regional status and trends of the resources, identify appropriate regional compensatory mitigation locations and actions to address those residual impacts, and recommend appropriate fees to implement those compensatory mitigation measures.« less
DO POST-MINING CONSTRUCTED CHANNELS REPLACE FUNCTIONAL ATTRIBUTES OF HEADWATER STREAMS?
Mountaintop removal and valley filling is a method for mining coal in the Appalachians. Surface coal mining regulations currently recognize constructed drainage ditches associated with valley fills as compensatory mitigation. Our objective was to determine if these constructed ch...
Notification: Review of Religious Compensatory Time
Project #OA-FY15-0180, August 5, 2015. The Office of Inspector General (OIG) for the U.S. Environmental Protection Agency (EPA) plans to begin field work on our audit of the EPA’s practices, policies and procedures for religious compensatory time.
Evaluating the Potential Effectiveness of Compensatory Mitigation Strategies for Marine Bycatch
Finkelstein, Myra; Bakker, Victoria; Doak, Daniel F.; Sullivan, Ben; Lewison, Rebecca; Satterthwaite, William H.; McIntyre, Peter B.; Wolf, Shaye; Priddel, David; Arnold, Jennifer M.; Henry, Robert W.; Sievert, Paul; Croxall, John
2008-01-01
Conservationists are continually seeking new strategies to reverse population declines and safeguard against species extinctions. Here we evaluate the potential efficacy of a recently proposed approach to offset a major anthropogenic threat to many marine vertebrates: incidental bycatch in commercial fisheries operations. This new approach, compensatory mitigation for marine bycatch (CMMB), is conceived as a way to replace or reduce mandated restrictions on fishing activities with compensatory activities (e.g., removal of introduced predators from islands) funded by levies placed on fishers. While efforts are underway to bring CMMB into policy discussions, to date there has not been a detailed evaluation of CMMB's potential as a conservation tool, and in particular, a list of necessary and sufficient criteria that CMMB must meet to be an effective conservation strategy. Here we present a list of criteria to assess CMMB that are tied to critical ecological aspects of the species targeted for conservation, the range of possible mitigation activities, and the multi-species impact of fisheries bycatch. We conclude that, overall, CMMB has little potential for benefit and a substantial potential for harm if implemented to solve most fisheries bycatch problems. In particular, CMMB is likely to be effective only when applied to short-lived and highly-fecund species (not the characteristics of most bycatch-impacted species) and to fisheries that take few non-target species, and especially few non-seabird species (not the characteristics of most fisheries). Thus, CMMB appears to have limited application and should only be implemented after rigorous appraisal on a case-specific basis; otherwise it has the potential to accelerate declines of marine species currently threatened by fisheries bycatch. PMID:18560568
Evaluating the potential effectiveness of compensatory mitigation strategies for marine bycatch
Finkelstein, M.; Bakker, V.; Doak, D.F.; Sullivan, B.; Lewison, R.; Satterthwaite, W.H.; McIntyre, P.B.; Wolf, S.; Priddel, D.; Arnold, J.M.; Henry, R.W.; Sievert, P.; Croxall, J.
2008-01-01
Conservationists are continually seeking new strategies to reverse population declines and safeguard against species extinctions. Here we evaluate the potential efficacy of a recently proposed approach to offset a major anthropogenic threat to many marine vertebrates: incidental bycatch in commercial fisheries operations. This new approach, compensatory mitigation for marine bycatch (CMMB), is conceived as a way to replace or reduce mandated restrictions on fishing activities with compensatory activities (e.g., removal of introduced predators from islands) funded by levies placed on fishers. While efforts are underway to bring CMMB into policy discussions, to date there has not been a detailed evaluation of CMMB's potential as a conservation tool, and in particular, a list of necessary and sufficient criteria that CMMB must meet to be an effective conservation strategy. Here we present a list of criteria to assess CMMB that are tied to critical ecological aspects of the species targeted for conservation, the range of possible mitigation activities, and the multi-species impact of fisheries bycatch. We conclude that, overall, CMMB has little potential for benefit and a substantial potential for harm if implemented to solve most fisheries bycatch problems. In particular, CMMB is likely to be effective only when applied to short-lived and highly-fecund species (not the characteristics of most bycatch-impacted species) and to fisheries that take few non-target species, and especially few non-seabird species (not the characteristics of most fisheries). Thus, CMMB appears to have limited application and should only be implemented after rigorous appraisal on a case-specific basis; otherwise it has the potential to accelerate declines of marine species currently threatened by fisheries bycatch. ?? 2008 Finkelstein et al.
Evaluating the potential effectiveness of compensatory mitigation strategies for marine bycatch.
Finkelstein, Myra; Bakker, Victoria; Doak, Daniel F; Sullivan, Ben; Lewison, Rebecca; Satterthwaite, William H; McIntyre, Peter B; Wolf, Shaye; Priddel, David; Arnold, Jennifer M; Henry, Robert W; Sievert, Paul; Croxall, John
2008-06-18
Conservationists are continually seeking new strategies to reverse population declines and safeguard against species extinctions. Here we evaluate the potential efficacy of a recently proposed approach to offset a major anthropogenic threat to many marine vertebrates: incidental bycatch in commercial fisheries operations. This new approach, compensatory mitigation for marine bycatch (CMMB), is conceived as a way to replace or reduce mandated restrictions on fishing activities with compensatory activities (e.g., removal of introduced predators from islands) funded by levies placed on fishers. While efforts are underway to bring CMMB into policy discussions, to date there has not been a detailed evaluation of CMMB's potential as a conservation tool, and in particular, a list of necessary and sufficient criteria that CMMB must meet to be an effective conservation strategy. Here we present a list of criteria to assess CMMB that are tied to critical ecological aspects of the species targeted for conservation, the range of possible mitigation activities, and the multi-species impact of fisheries bycatch. We conclude that, overall, CMMB has little potential for benefit and a substantial potential for harm if implemented to solve most fisheries bycatch problems. In particular, CMMB is likely to be effective only when applied to short-lived and highly-fecund species (not the characteristics of most bycatch-impacted species) and to fisheries that take few non-target species, and especially few non-seabird species (not the characteristics of most fisheries). Thus, CMMB appears to have limited application and should only be implemented after rigorous appraisal on a case-specific basis; otherwise it has the potential to accelerate declines of marine species currently threatened by fisheries bycatch.
33 CFR 332.5 - Ecological performance standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... whether the project is achieving its objectives. Performance standards should relate to the objectives of the compensatory mitigation project, so that the project can be objectively evaluated to determine if... objective and verifiable. Ecological performance standards must be based on the best available science that...
33 CFR 332.5 - Ecological performance standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... whether the project is achieving its objectives. Performance standards should relate to the objectives of the compensatory mitigation project, so that the project can be objectively evaluated to determine if... objective and verifiable. Ecological performance standards must be based on the best available science that...
33 CFR 332.5 - Ecological performance standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... whether the project is achieving its objectives. Performance standards should relate to the objectives of the compensatory mitigation project, so that the project can be objectively evaluated to determine if... objective and verifiable. Ecological performance standards must be based on the best available science that...
USDA-ARS?s Scientific Manuscript database
Considerable public funds are annually expended on stream restoration projects, but available science suggests that stream restoration as currently practiced is not effective in recovering ecosystem functional integrity. The physical scale of most stream restoration projects is insufficient because...
33 CFR 332.5 - Ecological performance standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Ecological performance standards..., DEPARTMENT OF DEFENSE COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES § 332.5 Ecological performance... objective and verifiable. Ecological performance standards must be based on the best available science that...
33 CFR 332.5 - Ecological performance standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... whether the project is achieving its objectives. Performance standards should relate to the objectives of the compensatory mitigation project, so that the project can be objectively evaluated to determine if... objective and verifiable. Ecological performance standards must be based on the best available science that...
In this article, we examine the adoption of the watershed approach and its technical methods into regulatory programs in Colorado and California. Specific steps and motives for the adoption are explained. Through close collaboration, regulators have systematically been made aware...
77 FR 13633 - Notice of Lodging Proposed Consent Decree
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-07
... wetlands in southeastern Massachusetts and to restore and perform compensatory mitigation at three existing... Protection Agency, 5 Post Office Square, Suite 100, Boston, Massachusetts 02109-3912. In addition, the... with the United States District Court for the District of Massachusetts in United States v. Charles...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Management. 332.7 Section 332.7... COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES § 332.7 Management. (a) Site protection. (1) The... covenants. For government property, long-term protection may be provided through federal facility management...
State Compensatory Education Annual Report, 1982-83.
ERIC Educational Resources Information Center
Georgia State Dept. of Education, Atlanta. Office of Instructional Services.
This document compiles compensatory education program data submitted to the Georgia State Department by local school systems in their 1982-83 annual reports. The first section describes state administration of grant funds (i.e., appropriations bills, procedures for allocating funds, program plans, and program monitoring). Specifically mentioned…
This proposal details a project whose goal is to develop a rapid assessment tool for determining the success of compensatory wetland mitigation within a hydrogeomorphic framework. Phase I of this program, currently in progress and funded through FY 2000 RARE funds, is developing...
Mountaintop removal and valley filling (MTR/VF) is a method of coal mining used in the Central Appalachians. Despite regulations requiring that potential mpacts to stream function be considered in determining compensatory mitigation associated with permitted fill activities, asse...
Visual Resource Analysis for Solar Energy Zones in the San Luis Valley
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, Robert; Abplanalp, Jennifer M.; Zvolanek, Emily
This report summarizes the results of a study conducted by Argonne National Laboratory’s (Argonne’s) Environmental Science Division for the U.S. Department of the Interior Bureau of Land Management (BLM). The study analyzed the regional effects of potential visual impacts of solar energy development on three BLM-designated solar energy zones (SEZs) in the San Luis Valley (SLV) in Colorado, and, based on the analysis, made recommendations for or against regional compensatory mitigation to compensate residents and other stakeholders for the potential visual impacts to the SEZs. The analysis was conducted as part of the solar regional mitigation strategy (SRMS) task conductedmore » by BLM Colorado with assistance from Argonne. Two separate analyses were performed. The first analysis, referred to as the VSA Analysis, analyzed the potential visual impacts of solar energy development in the SEZs on nearby visually sensitive areas (VSAs), and, based on the impact analyses, made recommendations for or against regional compensatory mitigation. VSAs are locations for which some type of visual sensitivity has been identified, either because the location is an area of high scenic value or because it is a location from which people view the surrounding landscape and attach some level of importance or sensitivity to what is seen from the location. The VSA analysis included both BLM-administered lands in Colorado and in the Taos FO in New Mexico. The second analysis, referred to as the SEZ Analysis, used BLM visual resource inventory (VRI) and other data on visual resources in the former Saguache and La Jara Field Offices (FOs), now contained within the San Luis Valley FO (SLFO), to determine whether the changes in scenic values that would result from the development of utility-scale solar energy facilities in the SEZs would affect the quality and quantity of valued scenic resources in the SLV region as a whole. If the regional effects were judged to be significant, regional compensatory mitigation was recommended. VRI data was not available for the Taos FO and it was not included in the SEZ analysis; the SEZ analysis includes BLM-administered lands in Colorado only.« less
Mountaintop removal and valley filling (MTR/VF) is a method of coal mining used in the Central Appalachians. Regulations require that potential impacts to stream functions must be considered when determining the compensatory mitigation necessary for replacing aquatic resources un...
Gellert, Paul; Ziegelmann, Jochen P; Lippke, Sonia; Schwarzer, Ralf
2012-04-01
Limitations in perceived lifetime can undermine long-term goal striving. Planning is supposed to translate intentions into health behaviors and to operate as a compensatory strategy to overcome goal striving deficits associated with a limited time perspective. Two longitudinal studies were conducted examining the compensatory role of planning: an online survey on fruit and vegetable consumption (N = 909; 16-78 years; follow-up at 4 months) and a questionnaire study on physical exercise in older adults (N = 289; 60-95 years, over a half-year period). Intentions, planning, and behavior were measured in a behavior-specific, future time perspective in a generic manner. Planning mediated between intentions and both health behaviors. Time perspective operated as a moderator, indicating that in individuals with a more limited time perspective, a stronger effect of planning on health behaviors emerged. Planning as a self-regulatory strategy may compensate for a limited time perspective.
ERIC Educational Resources Information Center
Fea, Henry R., Ed.; And Others
Two papers given at a conference on compensatory/remedial education are provided. The first paper, "How to Plan a Developmental English Program with College-Wide Cooperation" by Edith A. Freligh, discusses the hypothesis that certain kinds of personalities are attracted to certain kinds of disciplines, applying it to teachers, students, and…
44 CFR 78.5 - Flood Mitigation Plan development.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...
44 CFR 78.5 - Flood Mitigation Plan development.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...
44 CFR 78.5 - Flood Mitigation Plan development.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...
44 CFR 201.7 - Tribal Mitigation Plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Tribal Mitigation Plans. 201... OF HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.7 Tribal Mitigation Plans. The Indian Tribal Mitigation Plan is the representation of the Indian tribal government's commitment to...
NASA Astrophysics Data System (ADS)
Doyle, Martin W.; Singh, Jai; Lave, Rebecca; Robertson, Morgan M.
2015-07-01
We use geomorphic surveys to quantify the differences between restored and nonrestored streams, and the difference between streams restored for market purposes (compensatory mitigation) from those restored for nonmarket programs. We also analyze the social and political-economic drivers of the stream restoration and mitigation industry using analysis of policy documents and interviews with key personnel including regulators, mitigation bankers, stream designers, and scientists. Restored streams are typically wider and geomorphically more homogenous than nonrestored streams. Streams restored for the mitigation market are typically headwater streams and part of a large, complex of long restored main channels, and many restored tributaries; streams restored for nonmarket purposes are typically shorter and consist of the main channel only. Interviews reveal that designers integrate many influences including economic and regulatory constraints, but traditions of practice have a large influence as well. Thus, social forces shape the morphology of restored streams.
Compensatory activity in the extrastriate body area of Parkinson's disease patients.
van Nuenen, Bart F L; Helmich, Rick C; Buenen, Noud; van de Warrenburg, Bart P C; Bloem, Bastiaan R; Toni, Ivan
2012-07-11
Compensatory mechanisms are a crucial component of the cerebral changes triggered by neurodegenerative disorders. Identifying such compensatory mechanisms requires at least two complementary approaches: localizing candidate areas using functional imaging, and showing that interference with these areas has behavioral consequences. Building on recent imaging evidence, we use this approach to test whether a visual region in the human occipito-temporal cortex-the extrastriate body area-compensates for altered dorsal premotor activity in Parkinson's disease (PD) during motor-related processes. We separately inhibited the extrastriate body area and dorsal premotor cortex in 11 PD patients and 12 healthy subjects, using continuous theta burst stimulation. Our goal was to test whether these areas are involved in motor compensatory processes. We used motor imagery to isolate a fundamental element of motor planning, namely subjects' ability to incorporate the current state of their body into a motor plan (mental hand rotation). We quantified this ability through a posture congruency effect (i.e., the improvement in subjects' performance when their current body posture is congruent to the imagined movement). Following inhibition of the right extrastriate body area, the posture congruency effect was lost in PD patients, but not in healthy subjects. In contrast, inhibition of the left dorsal premotor cortex reduced the posture congruency effect in healthy subjects, but not in PD patients. These findings suggest that the right extrastriate body area plays a compensatory role in PD by supporting a function that is no longer performed by the dorsal premotor cortex.
44 CFR 78.5 - Flood Mitigation Plan development.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Flood Mitigation Plan development. 78.5 Section 78.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...
44 CFR 78.5 - Flood Mitigation Plan development.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan development. 78.5 Section 78.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
44 CFR 201.5 - Enhanced State Mitigation Plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Enhanced State Mitigation..., DEPARTMENT OF HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.5 Enhanced State Mitigation Plans. (a) A State with a FEMA approved Enhanced State Mitigation Plan at the time of a disaster...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
Code of Federal Regulations, 2011 CFR
2011-04-01
... Investment Companies § 230.701 Exemption for offers and sales of securities pursuant to certain compensatory... “Exchange Act”) (15 U.S.C. 78m or 78o(d)) and is not an investment company registered or required to be registered under the Investment Company Act of 1940 (15 U.S.C. 80a-1 et seq.). (2) Issuers that become...
Palmer, Margaret A; Hondula, Kelly L
2014-09-16
Compensatory mitigation is commonly used to replace aquatic natural resources being lost or degraded but little is known about the success of stream mitigation. This article presents a synthesis of information about 434 stream mitigation projects from 117 permits for surface mining in Appalachia. Data from annual monitoring reports indicate that the ratio of lengths of stream impacted to lengths of stream mitigation projects were <1 for many projects, and most mitigation was implemented on perennial streams while most impacts were to ephemeral and intermittent streams. Regulatory requirements for assessing project outcome were minimal; visual assessments were the most common and 97% of the projects reported suboptimal or marginal habitat even after 5 years of monitoring. Less than a third of the projects provided biotic or chemical data; most of these were impaired with biotic indices below state standards and stream conductivity exceeding federal water quality criteria. Levels of selenium known to impair aquatic life were reported in 7 of the 11 projects that provided Se data. Overall, the data show that mitigation efforts being implemented in southern Appalachia for coal mining are not meeting the objectives of the Clean Water Act to replace lost or degraded streams ecosystems and their functions.
44 CFR 78.6 - Flood Mitigation Plan approval process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...
44 CFR 78.6 - Flood Mitigation Plan approval process.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...
44 CFR 78.6 - Flood Mitigation Plan approval process.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...
44 CFR 78.6 - Flood Mitigation Plan approval process.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Flood Mitigation Plan approval..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...
Compensatory stream and wetland mitigation in North Carolina: an evaluation of regulatory success.
Hill, Tammy; Kulz, Eric; Munoz, Breda; Dorney, John R
2013-05-01
Data from a probability sample were used to estimate wetland and stream mitigation success from 2007 to 2009 across North Carolina (NC). "Success" was defined as whether the mitigation site met regulatory requirements in place at the time of construction. Analytical results were weighted by both component counts and mitigation size. Overall mitigation success (including preservation) was estimated at 74 % (SE = 3 %) for wetlands and 75 % (SE = 4 %) for streams in NC. Compared to the results of previous studies, wetland mitigation success rates had increased since the mid-1990s. Differences between mitigation providers (mitigation banks, NC Ecosystem Enhancement Program's design-bid-build and full-delivery programs, NC Department of Transportation and private permittee-responsible mitigation) were generally not significant although permittee-responsible mitigation yielded higher success rates in certain circumstances. Both wetland and stream preservation showed high rates of success and the stream enhancement success rate was significantly higher than that of stream restoration. Additional statistically significant differences when mitigation size was considered included: (1) the Piedmont yielded a lower stream mitigation success rate than other areas of the state, and (2) recently constructed wetland mitigation projects demonstrated a lower success rate than those built prior to 2002. Opportunities for improvement exist in the areas of regulatory record-keeping, understanding the relationship between post-construction establishment and long-term ecological trajectories of stream and wetland restoration projects, incorporation of numeric ecological metrics into mitigation monitoring and success criteria, and adaptation of stream mitigation designs to achieve greater success in the Piedmont.
Horney, Jennifer A; Nguyen, Mai; Cooper, John; Simon, Matthew; Ricchetti-Masterson, Kristen; Grabich, Shannon; Salvesen, David; Berke, Philip
2013-01-01
Rural areas of the United States are uniquely vulnerable to the impacts of natural disasters. One possible way to mitigate vulnerability to disasters in rural communities is to have a high-quality hazard mitigation plan in place. To understand the resources available for hazard mitigation planning and determine how well hazard mitigation plans in rural counties meet the needs of vulnerable populations, we surveyed the lead planning or emergency management official responsible for hazard mitigation plans in 96 rural counties in eight states in the Southeastern United States. In most counties, emergency management was responsible for implementing the county's hazard mitigation plan and the majority of counties had experienced a presidentially declared disaster in the last 5 years. Our research findings demonstrated that there were differences in subjective measures of vulnerability (as reported by survey respondents) and objective measures of vulnerability (as determined by US Census data). In addition, although few counties surveyed included outreach to vulnerable groups as a part of their hazard mitigation planning process, a majority felt that their hazard mitigation plan addressed the needs of vulnerable populations "well" or "very well." These differences could result in increased vulnerabilities in rural areas, particularly for certain vulnerable groups.
44 CFR 78.3 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...
44 CFR 78.3 - Responsibilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...
44 CFR 78.3 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...
44 CFR 78.3 - Responsibilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...
44 CFR 78.3 - Responsibilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance with... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...
ERIC Educational Resources Information Center
Taylor, P. H.
This pamphlet is about some of the techniques for curriculum planning which may prove useful in translating the aims of social education--competence, confidence, and co-operation--into practical educational procedures. It must be recognized from the start that for the enterprise of planning to be a success it has to be a shared enterprise; a group…
2007-01-01
Combat Critical Care Engineering: Evaluation of Closed Loop Control of Ventilation and Oxygen Flow During Resuscitation in the Compensatory and...Decompensatory Phases of Hemorrhagic Shock: This effort evaluated closed loop control of ventilation and oxygen flow during resuscitation in the...Cerebral Injury Volume, Cerebral Edema, Cerebral Blood Flow and Reactivity, and Histopathology in a Rat Model of Traumatic Brain Injury and Hemorrhagic
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-08
...; State/Local/Tribal Hazard Mitigation Plans AGENCY: Federal Emergency Management Agency, DHS. ACTION... . SUPPLEMENTARY INFORMATION: Collection of Information Title: State/Local/Tribal Hazard Mitigation Plans. Type of... Tribal Hazard Mitigation Plan requirements is to support the administration of FEMA Mitigation grant...
Code of Federal Regulations, 2011 CFR
2011-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
Code of Federal Regulations, 2013 CFR
2013-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
Code of Federal Regulations, 2014 CFR
2014-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6 Eligibility... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
A public health hazard mitigation planning process.
Griffith, Jennifer M; Kay Carpender, S; Crouch, Jill Artzberger; Quiram, Barbara J
2014-01-01
The Texas A&M Health Science Center School of Rural Public Health, a member of the Training and Education Collaborative System Preparedness and Emergency Response Learning Center (TECS-PERLC), has long-standing partnerships with 2 Health Service Regions (Regions) in Texas. TECS-PERLC was contracted by these Regions to address 2 challenges identified in meeting requirements outlined by the Risk-Based Funding Project. First, within Metropolitan Statistical Areas, there is not a formal authoritative structure. Second, preexisting tools and processes did not adequately satisfy requirements to assess public health, medical, and mental health needs and link mitigation strategies to the Public Health Preparedness Capabilities, which provide guidance to prepare for, respond to, and recover from public health incidents. TECS-PERLC, with its partners, developed a framework to interpret and apply results from the Texas Public Health Risk Assessment Tool (TxPHRAT). The 3-phase community engagement-based TxPHRAT Mitigation Planning Process (Mitigation Planning Process) and associated tools facilitated the development of mitigation plans. Tools included (1) profiles interpreting TxPHRAT results and identifying, ranking, and prioritizing hazards and capability gaps; (2) a catalog of intervention strategies and activities linked to hazards and capabilities; and (3) a template to plan, evaluate, and report mitigation planning efforts. The Mitigation Planning Process provided a framework for Regions to successfully address all funding requirements. TECS-PERLC developed more than 60 profiles, cataloged and linked 195 intervention strategies, and developed a template resulting in 20 submitted mitigation plans. A public health-focused, community engagement-based mitigation planning process was developed by TECS-PERLC and successfully implemented by the Regions. The outcomes met all requirements and reinforce the effectiveness of academic practice partnerships and importance of community engagement in mitigation planning. Additional funding has been approved to expand the Mitigation Planning Process to all counties in Texas with local health departments.
NASA Astrophysics Data System (ADS)
Beedasy, Jaishree; Whyatt, Duncan
Mauritius is a small island (1865 km 2) in the Indian Ocean. Tourism is the third largest economic sector of the country, after manufacturing and agriculture. A limitation of space and the island's vulnerable ecosystem warrants a rational approach to tourism development. The main problems so far have been to manipulate and integrate all the factors affecting tourism planning and to match spatial data with their relevant attributes. A Spatial Decision Support System (SDSS) for sustainable tourism planning is therefore proposed. The proposed SDSS design would include a GIS as its core component. A first GIS model has already been constructed with available data. Supporting decision-making in a spatial context is implicit in the use of GIS. However the analytical capability of the GIS has to be enhanced to solve semi-structured problems, where subjective judgements come into play. The second part of the paper deals with the choice, implementation and customisation of a relevant model to develop a specialised SDSS. Different types of models and techniques are discussed, in particular a comparison of compensatory and non-compensatory approaches to multicriteria evaluation (MCE). It is concluded that compensatory multicriteria evaluation techniques increase the scope of the present GIS model as a decision-support tool. This approach gives the user or decision-maker the flexibility to change the importance of each criterion depending on relevant objectives.
44 CFR 78.9 - Planning grant approval process.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...
44 CFR 78.9 - Planning grant approval process.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...
44 CFR 78.9 - Planning grant approval process.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...
44 CFR 78.9 - Planning grant approval process.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...
44 CFR 78.9 - Planning grant approval process.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...
Fitts Cochrane, Jean; Lonsdorf, Eric; Allison, Taber D; Sanders-Reed, Carol A
2015-09-01
Challenges arise when renewable energy development triggers "no net loss" policies for protected species, such as where wind energy facilities affect Golden Eagles in the western United States. When established mitigation approaches are insufficient to fully avoid or offset losses, conservation goals may still be achievable through experimental implementation of unproven mitigation methods provided they are analyzed within a framework that deals transparently and rigorously with uncertainty. We developed an approach to quantify and analyze compensatory mitigation that (1) relies on expert opinion elicited in a thoughtful and structured process to design the analysis (models) and supplement available data, (2) builds computational models as hypotheses about cause-effect relationships, (3) represents scientific uncertainty in stochastic model simulations, (4) provides probabilistic predictions of "relative" mortality with and without mitigation, (5) presents results in clear formats useful to applying risk management preferences (regulatory standards) and selecting strategies and levels of mitigation for immediate action, and (6) defines predictive parameters in units that could be monitored effectively, to support experimental adaptive management and reduction in uncertainty. We illustrate the approach with a case study characterized by high uncertainty about underlying biological processes and high conservation interest: estimating the quantitative effects of voluntary strategies to abate lead poisoning in Golden Eagles in Wyoming due to ingestion of spent game hunting ammunition.
Collins, Scott F.; Marcarelli, Amy M.; Baxter, Colden V.; Wipfli, Mark S.
2015-01-01
We critically evaluate some of the key ecological assumptions underpinning the use of nutrient replacement as a means of recovering salmon populations and a range of other organisms thought to be linked to productive salmon runs. These assumptions include: (1) nutrient mitigation mimics the ecological roles of salmon, (2) mitigation is needed to replace salmon-derived nutrients and stimulate primary and invertebrate production in streams, and (3) food resources in rearing habitats limit populations of salmon and resident fishes. First, we call into question assumption one because an array of evidence points to the multi-faceted role played by spawning salmon, including disturbance via redd-building, nutrient recycling by live fish, and consumption by terrestrial consumers. Second, we show that assumption two may require qualification based upon a more complete understanding of nutrient cycling and productivity in streams. Third, we evaluate the empirical evidence supporting food limitation of fish populations and conclude it has been only weakly tested. On the basis of this assessment, we urge caution in the application of nutrient mitigation as a management tool. Although applications of nutrients and other materials intended to mitigate for lost or diminished runs of Pacific salmon may trigger ecological responses within treated ecosystems, contributions of these activities toward actual mitigation may be limited.
National ESEA Chapter 1 Schoolwide Projects Conference.
ERIC Educational Resources Information Center
Cleveland Public Schools, OH.
This document is a collection of schoolwide compensatory education project plans for 22 elementary schools in the Cleveland (Ohio) Public Schools system, with funding provided by Chapter 1 of the Education Consolidation and Improvement Act. Chapter 1 project plans are included for the following schools: (1) Alfred A. Benesch; (2) Andrew J.…
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berger, Matthew T.; Judd, Steven L.
This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fraley, John J.; Marotz, Brian L.; DosSantos, Joseph M.
In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is onemore » of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and other features necessary for a long-term implementation plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Louis Militana; Cindy Huber; Christopher Colbert
2005-08-01
This is the second of two articles describing a plan that was developed to mitigate the effects of acid deposition and visibility impairment in four Class I areas from the proposed Longview Power Project. Part I (published in July 2005) discussed the air quality impacts of the proposed coal-fired power plant. Part II discusses the mitigation plan. 2 refs., 1 fig., 3 tabs.
Political and Economic Geomorphology: The Effect of Market Forces on Stream Restoration Designs
NASA Astrophysics Data System (ADS)
Singh, J.; Doyle, M. W.; Lave, R.; Robertson, M.
2013-12-01
Stream restoration in the U.S. is increasingly driven by compensatory mitigation; impacts to streams associated with typical land development activities must be offset via restoration of streams elsewhere. This policy application creates conditions in which restored stream ';credits' are traded under market-like conditions, comparable to wetland mitigation, carbon offsets, or endangered species habitat banking. The effect of this relatively new mechanism to finance stream restoration on design and construction is unknown. This research explores whether the introduction of a credit-based mitigation apparatus results in streams designed to maximize credit yields (i.e., ';credit-chasing') rather than focusing on restoring natural systems or functions. In other words, are market-based restored streams different from those designed for non-market purposes? We quantified geomorphic characteristics (e.g. hydraulic geometry, sinuosity, profile, bed sediment, LWD) of three types of streams: (1) a random sample of non-restored reaches, (2) streams restored for compensatory mitigation, and (3) streams restored under alternative funding sources (e.g., government grant programs, non-profit activities). We also compared the location of the types of stream reaches to determine whether there is a spatiality of restored streams. Physical data were complemented with a series of semi-structured interviews with key personnel in the stream restoration industry to solicit information on the influence of policy interpretation and market-driven factors on the design process. Preliminary analysis suggests that restoration is driving a directional shift in stream morphology in North Carolina. As a simple example, in the Piedmont, non-restored and restored channels had mean sinuosity of 1.17 and 1.23, respectively (p < 0.10). In the mountain region, non-restored and restored channels had mean sinuosity of 1.07 and 1.21, respectively (p < 0.01). In addition, restored streams were disproportionately located in very small catchments, and designs seemed to be only marginally related to the location of the stream. Provisional findings also indicate that the differences between mitigation and non-mitigation designs were less than expected. Interview data support this observation; design engineers and entrepreneurial credit providers (i.e., mitigation bankers) apparently viewed the design process as a somewhat standard, non-malleable practice. Sustaining long-term relationships with regulators, who must approve the sale of restored stream credits, was seen as critically important rather than the marginal gains to be made by manipulating particular stream designs to glean more credits. Overall, preliminary results demonstrate that regulatory frameworks, economic incentives and social relationships played a key role in driving stream restoration design in North Carolina, often homogenizing design practices and limiting ';credit chasing.'
NASA Astrophysics Data System (ADS)
Thomsen, Matthias S.; Garcia, Clement; Bolam, Stefan G.; Parker, Ruth; Godbold, Jasmin A.; Solan, Martin
2017-03-01
Consensus has been reached that global biodiversity loss impairs ecosystem functioning and the sustainability of services beneficial to humanity. However, the ecosystem consequences of extinction in natural communities are moderated by compensatory species dynamics, yet these processes are rarely accounted for in impact assessments and seldom considered in conservation programmes. Here, we use marine invertebrate communities to parameterise numerical models of sediment bioturbation - a key mediator of biogeochemical cycling - to determine whether post-extinction compensatory mechanisms alter biodiversity-ecosystem function relations following non-random extinctions. We find that compensatory dynamics lead to trajectories of sediment mixing that diverge from those without compensation, and that the form, magnitude and variance of each probabilistic distribution is highly influenced by the type of compensation and the functional composition of surviving species. Our findings indicate that the generalized biodiversity-function relation curve, as derived from multiple empirical investigations of random species loss, is unlikely to yield representative predictions for ecosystem properties in natural systems because the influence of post-extinction community dynamics are under-represented. Recognition of this problem is fundamental to management and conservation efforts, and will be necessary to ensure future plans and adaptation strategies minimize the adverse impacts of the biodiversity crisis.
Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bissell, Gael
1985-01-01
This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.
Hungry Horse Dam Fisheries Mitigation, 1992-1993 Progress Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DosSantos, Joe; Vashro, Jim; Lockard, Larry
1994-06-01
In February of 1900, over forty agency representatives and interested citizens began development of the 1991 Mitigation Plan. This effort culminated in the 1993 Implementation Plan for mitigation of fish losses attributable to the construction and operation of Hungry Horse Dam. The primary purpose of this biennial report is to inform the public of the status of ongoing mitigation activities resulting from those planning efforts. A habitat improvement project is underway to benefit bull trout in Big Creek in the North Fork drainage of the Flathead River and work is planned in Hay Creek, another North Fork tributary. Bull troutmore » redd counts have been expanded and experimental programs involving genetic evaluation, outmigrant monitoring, and hatchery studies have been initiated, Cutthroat mitigation efforts have focused on habitat improvements in Elliott Creek and Taylor`s Outflow and improvements have been followed by imprint plants of hatchery fish and/or eyed eggs in those streams. Rogers Lake west of Kalispell and Lion Lake, near Hungry Horse, were chemically rehabilitated. Cool and warm water fish habitat has been improved in Halfmoon Lake and Echo Lake. Public education and public interest is important to the future success of mitigation activities. As part of the mitigation team`s public awareness responsibility we have worked with numerous volunteer groups, public agencies, and private landowners to stimulate interest and awareness of mitigation activities and the aquatic ecosystem. The purpose of this biennial report is to foster public awareness of, and support for, mitigation activities as we move forward in implementing the Hungry Horse Dam Fisheries Mitigation Implementation Plan.« less
44 CFR 78.6 - Flood Mitigation Plan approval process.
Code of Federal Regulations, 2010 CFR
2010-10-01
... approval process. 78.6 Section 78.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood... reasons for non-approval and offer suggestions for improvement. ...
44 CFR 201.5 - Enhanced State Mitigation Plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... that the plan is integrated to the extent practicable with other State and/or regional planning...
44 CFR 201.5 - Enhanced State Mitigation Plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...
44 CFR 201.5 - Enhanced State Mitigation Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...
44 CFR 201.5 - Enhanced State Mitigation Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...
43 CFR 10005.16 - Plan content.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...
43 CFR 10005.16 - Plan content.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...
43 CFR 10005.16 - Plan content.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...
43 CFR 10005.16 - Plan content.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...
Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pava, Daniel S.
This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-14
...; State Administrative Plan for the Hazard Mitigation Grant Program AGENCY: Federal Emergency Management...: Collection of Information Title: State Administrative Plan for the Hazard Mitigation Grant Program. Type of... guide that details how the State will administer the Hazard Mitigation Grant Program (HMGP). An approved...
Code of Federal Regulations, 2010 CFR
2010-01-01
... option plan, post employment benefit or other compensatory arrangement. (e) Director means the Director... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Definitions. 1770.3 Section 1770.3 Banks and Banking OFFICE OF FEDERAL HOUSING ENTERPRISE OVERSIGHT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SAFETY...
Code of Federal Regulations, 2010 CFR
2010-04-01
... training plan, age 14 through 21 inclusive; and (2)(i) Economically disadvantaged; or (ii) Participating in a compensatory education program under Chapter I of title I of the Elementary and Secondary Education Act of 1965; or (iii) Has been determined to meet the eligibility requirements for free meals...
Code of Federal Regulations, 2011 CFR
2011-04-01
... training plan, age 14 through 21 inclusive; and (2)(i) Economically disadvantaged; or (ii) Participating in a compensatory education program under Chapter I of title I of the Elementary and Secondary Education Act of 1965; or (iii) Has been determined to meet the eligibility requirements for free meals...
Introduction to Software Product Line Adoption
2005-09-01
plans • improvement suggestions • risks and mitigation strategies • progress reports • risks and mitigation strategies • adoption plan • funding ... model • organization chart • product line concept of operations (CONOPS) • marketing plan • product proposals • acquisition strategy • organization risk
Ager, Alan A; Kline, Jeffrey D; Fischer, A Paige
2015-08-01
We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social science to improve understanding of community-wide risk perceptions and to predict property owners' capacities and willingness to mitigate risk by treating hazardous fuels and reducing the susceptibility of dwellings. In particular, we identify spatial scale mismatches in wildfire mitigation planning and their potential adverse impact on risk mitigation goals. Studies in other fire-prone regions suggest that these scale mismatches are widespread and contribute to continued wildfire dwelling losses. We discuss how risk perceptions and behavior contribute to scale mismatches and how they can be minimized through integrated analyses of landscape wildfire transmission and social factors that describe the potential for collaboration among landowners and land management agencies. These concepts are then used to outline an integrated socioecological planning framework to identify optimal strategies for local community risk mitigation and improve landscape-scale prioritization of fuel management investments by government entities. © 2015 Society for Risk Analysis.
A fast-paced delivery of approaches developed in EPA partnerships to enable effective inclusion of environmental and social resilience into hazard mitigation planning. This presentation will cover a broad spectrum, from 1) EPA’s role in mitigation, 2) what a Regional Resil...
ERIC Educational Resources Information Center
Peelle, Elizabeth
The Hartsville, Tennessee nuclear reactor site, the coal plant at Wheatland, Wyoming, and the nuclear plant at Skagit, Washington have mitigation plans developed in response to a federal, state, and local regulatory agency, respectively; the three mitigation plans aim at internalizing community-level social costs and benefits during the…
Beyond Your Paycheck: An Employee Benefits Primer.
ERIC Educational Resources Information Center
Stanton, Michael
1990-01-01
Discusses fringe benefits and points out that employee benefits in medium and large firms account for more than 27 percent of total compensation. Differentiates among statutory (required by law), compensatory (wages paid for time not worked such as vacation and sick leave), and supplementary (including insurance and pension plans) benefits and…
National Wetlands Mitigation Action Plan
On December 26, 2002, EPA and the Corps of Engineers announced the release of a comprehensive, interagency National Wetlands Mitigation Action Plan to further achievement of the goal of no net loss of wetlands.
44 CFR 201.6 - Local Mitigation Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... agencies that have the authority to regulate development, as well as businesses, academia and other private... the mitigation plan within a five-year cycle. (ii) A process by which local governments incorporate...
44 CFR 201.7 - Tribal Mitigation Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... mitigation activities, and agencies that have the authority to regulate development, as well as businesses...; (C) A general description of land uses and development trends within the tribal planning area so that...
44 CFR 201.4 - Standard State Mitigation Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... mitigation as well as to development in hazard-prone areas; a discussion of State funding capabilities for... identified. (iv) Identification of current and potential sources of Federal, State, local, or private funding...
44 CFR 201.4 - Standard State Mitigation Plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... mitigation as well as to development in hazard-prone areas; a discussion of State funding capabilities for... identified. (iv) Identification of current and potential sources of Federal, State, local, or private funding...
Planning Tools For Seismic Risk Mitigation. Rules And Applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
De Paoli, Rosa Grazia
2008-07-08
Recently, Italian urban planning research in the field of seismic risk mitigation are renewing. In particular, it promotes strategies that integrate urban rehabilitation and aseismic objectives, and also politicizes that are directed to revitalizes urban systems, coupling physical renewal and socio-economic development.In Italy the first law concerning planning for seismic mitigation dates back 1974, the law n. 64 'Regulation for buildings with particular rules for the seismic areas' where the rules for buildings in seismic areas concerning also the local hazard. This law, in fact, forced the municipalities to acquire, during the formation of the plans, a preventive opinion ofmore » compatibility between planning conditions and geomorphology conditions of the territory. From this date the conviction that the seismic risk must be considered inside the territorial planning especially in terms of strategies of mitigation has been strengthened.The town planners have started to take an interest in seismic risk in the [80]s when the Irpinia's earthquake took place. The researches developed after this earthquake have established that the principal cause of the collapse of buildings are due to from the wrong location of urban settlements (on slopes or crowns) After Irpinia's earthquake the first researches on seismic risk mitigation, in particular on the aspects related to the hazards and to the urban vulnerability were made.« less
Development by Design in Colombia: Making Mitigation Decisions Consistent with Conservation Outcomes
Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph
2013-01-01
Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition. PMID:24339972
Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph
2013-01-01
Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition.
43 CFR 10005.8 - Mitigation obligations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...
43 CFR 10005.8 - Mitigation obligations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...
43 CFR 10005.8 - Mitigation obligations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...
43 CFR 10005.8 - Mitigation obligations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...
Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua
2010-11-01
Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.
Model Programs Compensatory Education: Mother-Child Home Program, Freeport, New York.
ERIC Educational Resources Information Center
American Institutes for Research in the Behavioral Sciences, Palo Alto, CA.
The Mother-Child Home Program was designed to modify the early cognitive experience of preschool disadvantaged children by "intervening" with a series of verbal stimulation activities planned to raise the child's measured IQ. Intervention was timed to occur with early speech development and within the context of family relationships. The…
Preventing a data breach from becoming a disaster.
Goldberg, Ed
2013-01-01
Organisations have traditionally dealt with data breaches by investing in protective measures without a great deal of attention to mitigation of breach consequences and response. Conversely, business continuity (BC) planning has traditionally focused on mitigating disasters, not on preventing them. From a BC planning perspective, organisations need to assume that a data breach is inevitable and plan accordingly. The spate of data breaches in these past few years hit many organisations that were well protected. Those that suffered disastrous consequences as a result of a data breach lacked effective mitigation and response, not protection. The complexity and speed of an effective data breach response require that detailed planning takes place in advance of a breach.
Torok; Lockwood; Fanz
1996-09-01
A review of wetland impacts authorized under the New Jersey Freshwater Wetlands Protection Act (FWPA) was conducted based on permitting data compiled for the period 1 July 1988 to 31 December 1993. Data regarding the acreage of wetlands impacted, location of impacts by drainage basin and watershed, and mitigation were analyzed. Wetland impacts authorized and mitigation under New Jersey's program were evaluated and compared with Section 404 information available for New Jersey and other regions of the United States.Under the FWPA, 3003 permits were issued authorizing impacts to 234.76 ha (602.27 acres) of wetlands and waters. Compensatory mitigation requirements for impacts associated with individual permits required the creation of 69.20 ha.(171.00 acres), and restoration of 16.49 ha (40.75 acres) of wetlands. Cumulative impacts by watershed were directly related to levels of development and population growth.The FWPA has resulted in an estimated 67% reduction [44.32 ha (109.47 acres) vs 136.26 ha (336.56 acres)] in annual wetland and water impacts when compared with Section 404 data for New Jersey. For mitigation, the slight increase in wetland acreage over acreage impacted is largely consistent with Section 404 data.Based on this evaluation, the FWPA has succeeded in reducing the level of wetland impacts in New Jersey. However, despite stringent regulation of activities in and around wetlands, New Jersey continues to experience approximately 32 ha (79 acres) of unmitigated wetland impacts annually. Our results suggest that additional efforts focusing on minimizing wetland impacts and increasing wetlands creation are needed to attain a goal of no net loss of freshwater wetlands.KEY WORDS: Wetlands; Clean Water Act; Freshwater Wetland Protection Act; Nationwide permits; Mitigation; New Jersey
Zhang, Wei; Gordon, Andrew M; Fu, Qiushi; Santello, Marco
2010-06-01
Planning of object manipulations is dependent on the ability to generate, store, and retrieve sensorimotor memories of previous actions associated with grasped objects. However, the sensorimotor memory representations linking object properties to the planning of grasp are not well understood. Here we use an object rotation task to gain insight into the mechanisms underlying the nature of these sensorimotor memories. We asked subjects to grasp a grip device with an asymmetrical center of mass (CM) anywhere on its vertical surfaces and lift it while minimizing object roll. After subjects learned to minimize object roll by generating a compensatory moment, they were asked to rotate the object 180 degrees about a vertical axis and lift it again. The rotation resulted in changing the direction of external moment opposite to that experienced during the prerotation block. Anticipatory grasp control was quantified by measuring the compensatory moment generated at object lift onset by thumb and index finger forces through their respective application points. On the first postrotation trial, subjects failed to generate a compensatory moment to counter the external moment caused by the new CM location, thus resulting in a large object roll. Nevertheless, after several object rotations subjects reduced object roll on the initial postrotation trials by anticipating the new CM location through the modulation of digit placement but not tangential forces. The differential improvement in modulating these two variables supports the notion of independent memory representations of kinematics and kinetics and is discussed in relation to neural mechanisms underlying visuomotor transformations.
Zhang, Wei; Gordon, Andrew M.; Fu, Qiushi
2010-01-01
Planning of object manipulations is dependent on the ability to generate, store, and retrieve sensorimotor memories of previous actions associated with grasped objects. However, the sensorimotor memory representations linking object properties to the planning of grasp are not well understood. Here we use an object rotation task to gain insight into the mechanisms underlying the nature of these sensorimotor memories. We asked subjects to grasp a grip device with an asymmetrical center of mass (CM) anywhere on its vertical surfaces and lift it while minimizing object roll. After subjects learned to minimize object roll by generating a compensatory moment, they were asked to rotate the object 180° about a vertical axis and lift it again. The rotation resulted in changing the direction of external moment opposite to that experienced during the prerotation block. Anticipatory grasp control was quantified by measuring the compensatory moment generated at object lift onset by thumb and index finger forces through their respective application points. On the first postrotation trial, subjects failed to generate a compensatory moment to counter the external moment caused by the new CM location, thus resulting in a large object roll. Nevertheless, after several object rotations subjects reduced object roll on the initial postrotation trials by anticipating the new CM location through the modulation of digit placement but not tangential forces. The differential improvement in modulating these two variables supports the notion of independent memory representations of kinematics and kinetics and is discussed in relation to neural mechanisms underlying visuomotor transformations. PMID:20357064
1995-11-01
based on established and incentive for Delta compliance. functioning replacement wetlands. Perhaps the most compelling reason given for why The permit...developed mitigation plans powerful incentive for ventures to carefully site, for the Cricket Creek site in accordance with the plan, and execute the...Opportunity. Lev, Esther (with field assistance by Peter Zika ) for the Lane County Council of Governments, 1988 (revised 1990), Preliminary Inventory of
Compensatory mutations cause excess of antagonistic epistasis in RNA secondary structure folding.
Wilke, Claus O; Lenski, Richard E; Adami, Christoph
2003-02-05
The rate at which fitness declines as an organism's genome accumulates random mutations is an important variable in several evolutionary theories. At an intuitive level, it might seem natural that random mutations should tend to interact synergistically, such that the rate of mean fitness decline accelerates as the number of random mutations is increased. However, in a number of recent studies, a prevalence of antagonistic epistasis (the tendency of multiple mutations to have a mitigating rather than reinforcing effect) has been observed. We studied in silico the net amount and form of epistatic interactions in RNA secondary structure folding by measuring the fraction of neutral mutants as a function of mutational distance d. We found a clear prevalence of antagonistic epistasis in RNA secondary structure folding. By relating the fraction of neutral mutants at distance d to the average neutrality at distance d, we showed that this prevalence derives from the existence of many compensatory mutations at larger mutational distances. Our findings imply that the average direction of epistasis in simple fitness landscapes is directly related to the density with which fitness peaks are distributed in these landscapes.
Compensatory mutations cause excess of antagonistic epistasis in RNA secondary structure folding
Wilke, Claus O; Lenski, Richard E; Adami, Christoph
2003-01-01
Background The rate at which fitness declines as an organism's genome accumulates random mutations is an important variable in several evolutionary theories. At an intuitive level, it might seem natural that random mutations should tend to interact synergistically, such that the rate of mean fitness decline accelerates as the number of random mutations is increased. However, in a number of recent studies, a prevalence of antagonistic epistasis (the tendency of multiple mutations to have a mitigating rather than reinforcing effect) has been observed. Results We studied in silico the net amount and form of epistatic interactions in RNA secondary structure folding by measuring the fraction of neutral mutants as a function of mutational distance d. We found a clear prevalence of antagonistic epistasis in RNA secondary structure folding. By relating the fraction of neutral mutants at distance d to the average neutrality at distance d, we showed that this prevalence derives from the existence of many compensatory mutations at larger mutational distances. Conclusions Our findings imply that the average direction of epistasis in simple fitness landscapes is directly related to the density with which fitness peaks are distributed in these landscapes. PMID:12590655
Schmitter-Edgecombe, Maureen; Parsey, Carolyn; Lamb, Richard
2014-01-01
The Instrumental Activities of Daily Living – Compensation (IADL-C) scale was developed to capture early functional difficulties and to quantify compensatory strategy use that may mitigate functional decline in the aging population. The IADL-C was validated in a sample of cognitively healthy older adults (N=184) and individuals with mild cognitive impairment (MCI; N=92) and dementia (N=24). Factor analysis and Rasch item analysis led to the 27-item IADL-C informant questionnaire with four functional domain subscales (money and self-management, home daily living, travel and event memory, and social skills). The subscales demonstrated good internal consistency (Rasch reliability 0.80 to 0.93) and test-retest reliability (Spearman coefficients 0.70 to 0.91). The IADL-C total score and subscales showed convergent validity with other IADL measures, discriminant validity with psychosocial measures, and the ability to discriminate between diagnostic groups. The money and self management subscale showed notable difficulties for individuals with MCI, whereas difficulties with home daily living became more prominent for dementia participants. Compensatory strategy use increased in the MCI group and decreased in the dementia group. PMID:25344901
Landscape characteristics of a stream and wetland mitigation banking program.
BenDor, Todd; Sholtes, Joel; Doyle, Martin W
2009-12-01
In the United States, stream restoration is an increasing part of environmental and land management programs, particularly under the auspices of compensatory mitigation regulations. Markets and regulations surrounding stream mitigation are beginning to mirror those of the well-established wetland mitigation industry. Recent studies have shown that wetland mitigation programs commonly shift wetlands across space from urban to rural areas, thereby changing the functional characteristics and benefits of wetlands in the landscape. However, it is not yet known if stream mitigation mirrors this behavior, and if so, what effects this may have on landscape-scale ecological and hydrological processes. This project addresses three primary research questions. (1) What are the spatial relationships between stream and wetland impact and compensation sites as a result of regulations requiring stream and wetland mitigation in the State of North Carolina? (2) How do stream impacts come about due to the actions of different types of developers, and how do the characteristics of impacts sites compare with compensation sites? (3) To what extent does stream compensation relocate high-quality streams within the river network, and how does this affect localized (intrawatershed) loss or gain of aquatic resources? Using geospatial data collected from the North Carolina Division of Water Quality and the Army Corps of Engineers' Wilmington District, we analyzed the behavior of the North Carolina Ecosystem Enhancement Program in providing stream and wetland mitigation for the State of North Carolina. Our results suggest that this program provides mitigation (1) in different ways for different types of permittees; (2) at great distances (both Euclidean and within the stream network) from original impacts; (3) in significantly different places than impacts within watersheds; and (4) in many cases, in different watersheds from original impacts. Our analysis also reveals problems with regulator data collection, storage, and quality control. These results have significant implications given new federal requirements for ecological consistency within mitigation programs. Our results also indicate some of the landscape-scale implications of using market-based approaches to ecological restoration in general.
Alan A. Ager; Jeffrey D. Kline; A. Paige Fisher
2015-01-01
We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social...
Resilience Mitigation Financing Webinar for Water and Wastewater Utilities
The Resilience Mitigation Financing for Water and Wastewater Utilities webinar focuses on tools and financing resources to conduct resilience planning and to mitigate impacts before a disaster strikes.
[Papers Presented at the National Equal Education Institute, St. Louis, Missouri, March 1973.
ERIC Educational Resources Information Center
Overlan, S. Francis; And Others
Contents include the following papers: (1) "Vouching for School Desegregation," a discussion of the "regulated compensatory voucher plan" proposed by the Center for the Study of Public Policy (a private non-profit research group in Cambridge, Massachusetts) in 1969; (2) "Parental Involvement in the Desegregated School," Vincent J. Villa; (3)…
THE QUEST FOR RACIAL EQUALITY IN THE PITTSBURGH PUBLIC SCHOOLS. ANNUAL REPORT, 1965.
ERIC Educational Resources Information Center
Pittsburgh Board of Public Education, PA.
THIS REPORT FURNISHES AN ACCOUNT OF THE POLICIES OF THE PITTSBURGH PUBLIC SCHOOLS ON RACIAL INTEGRATION AND EQUALITY OF EDUCATIONAL OPPORTUNITY. PRINCIPLES, PRACTICES, AND PLANS FOR THE FUTURE ARE DETAILED, AND SPECIAL PROBLEM AREAS ARE IDENTIFIED. COMPENSATORY EDUCATION, EVEN IF IT IMPLIES DELAYED INTEGRATION IN SOME INSTANCES, IS SEEN AS THE…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen B.
This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Yearmore » Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.« less
DOT National Transportation Integrated Search
2016-06-01
This literature review will confirm prior work in the use of locomotive airbag technologies for vehicle or pedestrian collision : mitigation, and to focus planned activities and tasks for this research. The state of the art in relevant technologies h...
We update and reevaluate the scientific information on the distribution, history and causes of continental shelf hypoxia that supports the 2001 "Action Plan for Reducing, Mitigating, and Controlling Hypoxiain the Northern Gulf of Mexico," incorporating data, publications, and res...
300 Area Building Retention Evaluation Mitigation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. J. McBride
2007-07-03
Evaluate the long-term retention of several facilities associated with the PNNL Capability Replacement Laboratory and other Hanfor mission needs. WCH prepared a mitigation plan for three scenarios with different release dates for specific buildings. The evaluations present a proposed plan for providing utility services to retained facilities in support of a long-term (+20 year) lifespan in addition to temporary services to buildings with specified delayed release dates.
Tallis, Heather; Cole, Aaron; Schill, Steven; Martin, Erik; Heiner, Michael; Paiz, Marie-Claire; Aldous, Allison; Apse, Colin; Nickel, Barry
2017-01-01
Rapidly developing countries contain both the bulk of intact natural areas and biodiversity, and the greatest untapped natural resource stocks, placing them at the forefront of “green” economic development opportunities. However, most lack scientific tools to create development plans that account for biodiversity and ecosystem services, diminishing the real potential to be sustainable. Existing methods focus on biodiversity and carbon priority areas across large geographies (e.g., countries, states/provinces), leaving out essential services associated with water supplies, among others. These hydrologic ecosystem services (HES) are especially absent from methods applied at large geographies and in data-limited contexts. Here, we present a novel, spatially explicit, and relatively simple methodology to identify countrywide HES priority areas. We applied our methodology to the Gabonese Republic, a country undergoing a major economic transformation under a governmental commitment to balance conservation and development goals. We present the first national-scale maps of HES priority areas across Gabon for erosion control, nutrient retention, and groundwater recharge. Priority sub-watersheds covered 44% of the country’s extent. Only 3% of the country was identified as a priority area for all HES simultaneously, highlighting the need to conserve different areas for each different hydrologic service. While spatial tradeoffs occur amongst HES, we identified synergies with two other conservation values, given that 66% of HES priority areas intersect regions of above average area-weighted (by sub-watersheds) total forest carbon stocks and 38% intersect with terrestrial national parks. Considering implications for development, we identified HES priority areas overlapping current or proposed major roads, forestry concessions, and active mining concessions, highlighting the need for proactive planning for avoidance areas and compensatory offsets to mitigate potential conflicts. Collectively, our results provide insight into strategies to protect HES as part of Gabon’s development strategy, while providing a replicable methodology for application to new scales, geographies, and policy contexts. PMID:28594870
ERIC Educational Resources Information Center
Slaughter, Helen B.; And Others
Although many large districts have centrally organized their Chapter 1 (Education Consolidation and Improvement Act) compensatory programs at the district and project levels, elementary school improvement efforts are strongly tied to local school autonomy and principal leadership. This paper analyzes the Tucson (Arizona) Unified School District's…
New Science Applications Within the U.S. National Tsunami Hazard Mitigation Program
NASA Astrophysics Data System (ADS)
Wilson, R. I.; Eble, M. C.; Forson, C. K.; Horrillo, J. J.; Nicolsky, D.
2017-12-01
The U.S. National Tsunami Hazard Mitigation Program (NTHMP) is a collaborative State and Federal program which supports consistent and cost effective tsunami preparedness and mitigation activities at a community level. The NTHMP is developing a new five-year Strategic Plan based on the 2017 Tsunami Warning, Education, and Research Act as well as recommendations the 2017 NTHMP External Review Panel. Many NTHMP activities are based on the best available scientific methods through the NTHMP Mapping and Modeling Subcommittee (MMS). The primary activities for the MMS member States are to characterize significant tsunami sources, numerically model those sources, and create tsunami inundation maps for evacuation planning. This work remains a focus for many unmapped coastlines. With the lessons learned from the 2004 Indian Ocean and 2011 Tohoku Japan tsunamis, where both immediate risks and long-term recovery issues where recognized, the NTHMP MMS is expanding efforts into other areas that address community resilience. Tsunami evacuation modeling based on both pedestrian and vehicular modes of transportation are being developed by NTHMP States. Products include tools for the public to create personal evacuation maps. New tsunami response planning tools are being developed for both maritime and coastal communities. Maritime planning includes tsunami current-hazard maps for in-harbor and offshore response activities. Multi-tiered tsunami evacuation plans are being developed in some states to address local- versus distant-source tsunamis, as well as real-time evacuation plans, or "playbooks," for distant-source tsunamis forecasted to be less than the worst-case flood event. Products to assist community mitigation and recovery are being developed at a State level. Harbor Improvement Reports, which evaluate the impacts of currents, sediment, and debris on harbor infrastructure, include direct mitigation activities for Local Hazard Mitigation Plans. Building code updates in the five Pacific states will include new sections on tsunami load analysis of structures, and require Tsunami Design Zones based on probabilistic analyses. Guidance for community recovery planning has also been initiated. These new projects are being piloted by some States and will help create guidance for other States in the future.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Confederated Tribes of the Umatilla Indian Reservation Wildlife Program
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding themore » enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.« less
Wildlife Habitat Impact Assessment, Chief Joseph Dam Project, Washington : Project Report 1992.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuehn, Douglas; Berger, Matthew
1992-01-01
Under the Pacific Northwest Electric Power Planning and Conservation Act of 1980, and the subsequent Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program, a wildlife habitat impact assessment and identification of mitigation objectives have been developed for the US Army Corps of Engineer`s Chief Joseph Dam Project in north-central Washington. This study will form the basis for future mitigation planning and implementation.
NASA Astrophysics Data System (ADS)
Osland, Anna Christine
Hazardous liquid and natural gas transmission pipelines have received limited attention by planning scholars even though local development decisions can have broad consequences if a rupture occurs. In this dissertation, I evaluated the implications of land-use planning for reducing risk to transmission pipeline hazards in North Carolina via three investigations. First, using a survey of planning directors in jurisdictions with transmission pipeline hazards, I investigated the land use planning tools used to mitigate pipeline hazards and the factors associated with tool adoption. Planning scholars have documented the difficulty of inducing planning in hazardous areas, yet there remain gaps in knowledge about the factors associated with tool adoption. Despite the risks associated with pipeline ruptures, I found most localities use few mitigation tools, and the adoption of regulatory and informational tools appear to be influenced by divergent factors. Whereas risk perception, commitment, capacity, and community context were associated with total tool and information tool use, only risk perception and capacity factors were associated with regulatory tool use. Second, using interviews of emergency managers and planning directors, I examined the role of agency collaboration for building mitigation capacity. Scholars have highlighted the potential of technical collaboration, yet less research has investigated how inter-agency collaboration shapes mitigation capacity. I identify three categories of technical collaboration, discuss how collaborative spillovers can occur from one planning area to another, and challenge the notion that all technical collaborations result in equal mitigation outcomes. Third, I evaluated characteristics of the population near pipelines to address equity concerns. Surprisingly, I did not find broad support for differences in exposure of vulnerable populations. Nonetheless, my analyses uncovered statistically significant clusters of vulnerable groups within the hazard area. Interestingly, development closer to pipelines was newer than areas farther away, illustrating the failure of land-use planning to reduce development encroachment. Collectively, these results highlight the potential of land-use planning to keep people and development from encroaching on pipeline hazards. While this study indicates that planners in many areas address pipeline hazards, it also illustrates how changes to local practices can further reduce risks to human health, homeland security, and the environment.
40 CFR 51.860 - Mitigation of air quality impacts.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Mitigation of air quality impacts. 51... Federal Actions to State or Federal Implementation Plans § 51.860 Mitigation of air quality impacts. Link... mitigate air quality impacts must be identified and the process for implementation and enforcement of such...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ashley, Paul
1992-06-01
The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fredenberg, Wade; Carty, Daniel; Cavigli, Jon
1996-06-01
The operation of Hungry Horse Dam on the South Fork-of the Flathead River reduced the reproductive success of kokanee (Oncorhynchus nerka) spawning in the Flathead River. Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) authored a mitigation plan to offset those losses. The mitigation goal, stated in the Fisheries Mitigation Plan for Losses Attributed to the Construction and Operation of Hungry Horse Dam, is to: {open_quotes}Replace lost annual production of 100,000 kokanee adults, initially through hatchery production and pen rearing in Flathead Lake, partially replacing lost forage for lake trout (Salvelinus namaycush) in Flatheadmore » Lake.{close_quotes}« less
44 CFR 201.3 - Responsibilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
... cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL) programs... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...
Riva, Dario; Mamo, Carlo; Fanì, Mara; Saccavino, Patrizia; Rocca, Flavio; Momenté, Manuel; Fratta, Marianna
2013-01-01
In developed countries, falls in older people represent a rising problem. As effective prevention should start before the risk becomes evident, an early predictor is needed. Single stance instability would appear as a major risk factor. Aims of the study were to describe single stance stability, its sensory components, and their correlation with age and gender. A random sample of 597 older adults (319 men, 278 women) living at home, aged 65–84, was studied. Stability tests were performed with an electronic postural station. The single stance test showed the impairment of single stance stability in older individuals (75–84 yrs). The significant decline of stability in the older subjects may be explained by the impairment of proprioceptive control together with the decrease in compensatory visual stabilization and emergency responses. Younger subjects (65–74 yrs) exhibited better, but still inadequate, proprioceptive control with compensatory visual stabilization. Gender differences appeared in older subjects: women were significantly less stable than men. The measurement of the sensory components of single stance stability could aid in the early detection of a decay in antigravity movements many years before the risk of falling becomes evident. Adequate proprioceptive control could mitigate the effects of all other risks of falling. PMID:23984068
Erlotinib augmentation with dapsone for rash mitigation and increased anti-cancer effectiveness.
Kast, R E
2015-01-01
The epidermal growth factor receptor tyrosine kinase inhibitor erlotinib has failed in many ways to be as potent in the anti-cancer role as pre-clinical studies would have suggested. This paper traces some aspects of this failure to a compensatory erlotinib-mediated increase in interleukin-8. Many other-but not all- cancer chemotherapeutic cytotoxic drugs also provoke a compensatory increase in a malignant clone's interleukin-8 synthesis. Untreated glioblastoma and other cancer cells themselves natively synthesize interleukin-8. Interleukin-8 has tumor growth promoting, mobility and metastasis formation enhancing, effects as well as pro-angiogenesis effects. The old sulfone antibiotic dapsone- one of the very first antibiotics in clinical use- has demonstrated several interleukin-8 system inhibiting actions. Review of these indicates dapsone has potential to augment erlotinib effectiveness. Erlotinib typically gives a rash that has recently been proven to come about via an erlotinib triggered up-regulated keratinocyte interleukin-8 synthesis. The erlotinib rash shares histological features reminiscent of typical neutrophilic dermatoses. Dapsone has an established therapeutic role in current treatment of other neutrophilic dermatoses. Thus, dapsone has potential to both improve the quality of life in erlotinib treated patients by amelioration of rash as well as to short-circuit a growth-enhancing aspect of erlotinib when used in the anti-cancer role.
West Valley demonstration project: Implementation of the kerosene mitigation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.
1987-05-01
An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab.
Evaluating fuel complexes for fire hazard mitigation planning in the southeastern United States
Anne G. Andreu; Dan Shea; Bernard R. Parresol; Roger D. Ottmar
2012-01-01
Fire hazard mitigation planning requires an accurate accounting of fuel complexes to predict potential fire behavior and effects of treatment alternatives. In the southeastern United States, rapid vegetation growth coupled with complex land use history and forest management options requires a dynamic approach to fuel characterization. In this study we assessed...
DOT National Transportation Integrated Search
2014-11-01
The objective of this research project is to assess current mitigation policies and practices in comparison to : resource agency objectives and to identify mitigation strategies and priorities that provide greater cost-benefit potential and implement...
DOT National Transportation Integrated Search
2014-04-01
The objective of this research project is to assess current mitigation policies and practices in comparison to : resource agency objectives, and identify mitigation strategies and priorities that provide greater cost-benefit : potential and implement...
Wetlands Mitigation Banking Concepts
1992-07-01
Naval Amphibious Bas Eslgrss Mit. Bank CA, San Diego Co. dredging & facilities Dept of the Navy SeaWorld Eelgras Mitigation Dank CA, San Diego Co...shore development, private projects SeaWorld 8 Table 2. WETLAND MITIGATION BANKS UNDER PLANNING, Institute for Water Resources Preliminary Survey Data
44 CFR 201.3 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...
44 CFR 201.3 - Responsibilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.2... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...
44 CFR 201.3 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...
44 CFR 201.3 - Responsibilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...
Code of Federal Regulations, 2011 CFR
2011-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...
Code of Federal Regulations, 2013 CFR
2013-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...
Code of Federal Regulations, 2014 CFR
2014-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...
Hughes, Charmayne M L; Baber, Chris; Bienkiewicz, Marta; Worthington, Andrew; Hazell, Alexa; Hermsdörfer, Joachim
2015-01-01
Approximately 33% of stroke patients have difficulty performing activities of daily living, often committing errors during the planning and execution of such activities. The objective of this study was to evaluate the ability of the human error identification (HEI) technique SHERPA (Systematic Human Error Reduction and Prediction Approach) to predict errors during the performance of daily activities in stroke patients with left and right hemisphere lesions. Using SHERPA we successfully predicted 36 of the 38 observed errors, with analysis indicating that the proportion of predicted and observed errors was similar for all sub-tasks and severity levels. HEI results were used to develop compensatory cognitive strategies that clinicians could employ to reduce or prevent errors from occurring. This study provides evidence for the reliability and validity of SHERPA in the design of cognitive rehabilitation strategies in stroke populations.
Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry
2003-06-09
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Confederated Tribes of the Umatilla Indian Reservation Wildlife Program
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receivemore » credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.« less
Maneuver Planning for Conjunction Risk Mitigation with Ground-track Control Requirements
NASA Technical Reports Server (NTRS)
McKinley, David
2008-01-01
The planning of conjunction Risk Mitigation Maneuvers (RMM) in the presence of ground-track control requirements is analyzed. Past RMM planning efforts on the Aqua, Aura, and Terra spacecraft have demonstrated that only small maneuvers are available when ground-track control requirements are maintained. Assuming small maneuvers, analytical expressions for the effect of a given maneuver on conjunction geometry are derived. The analytical expressions are used to generate a large trade space for initial RMM design. This trade space represents a significant improvement in initial maneuver planning over existing methods that employ high fidelity maneuver models and propagation.
NASA Astrophysics Data System (ADS)
Thorne, James H.; Girvetz, Evan H.; McCoy, Michael C.
2009-05-01
This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.
Thorne, James H; Girvetz, Evan H; McCoy, Michael C
2009-05-01
This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.
5 CFR 550.1405 - Crediting compensatory time off.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1405 Crediting compensatory time off. (a) Upon a... employee is entitled to credit for compensatory time off for travel under the conditions specified in this... employee's request for credit of compensatory time off for travel may be denied if the request is not filed...
5 CFR 550.1405 - Crediting compensatory time off.
Code of Federal Regulations, 2014 CFR
2014-01-01
... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1405 Crediting compensatory time off. (a) Upon a... employee is entitled to credit for compensatory time off for travel under the conditions specified in this... employee's request for credit of compensatory time off for travel may be denied if the request is not filed...
5 CFR 550.1405 - Crediting compensatory time off.
Code of Federal Regulations, 2012 CFR
2012-01-01
... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1405 Crediting compensatory time off. (a) Upon a... employee is entitled to credit for compensatory time off for travel under the conditions specified in this... employee's request for credit of compensatory time off for travel may be denied if the request is not filed...
5 CFR 550.1405 - Crediting compensatory time off.
Code of Federal Regulations, 2013 CFR
2013-01-01
... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1405 Crediting compensatory time off. (a) Upon a... employee is entitled to credit for compensatory time off for travel under the conditions specified in this... employee's request for credit of compensatory time off for travel may be denied if the request is not filed...
5 CFR 550.1405 - Crediting compensatory time off.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1405 Crediting compensatory time off. (a) Upon a... employee is entitled to credit for compensatory time off for travel under the conditions specified in this... employee's request for credit of compensatory time off for travel may be denied if the request is not filed...
Predicting the onset of inappropriate compensatory behaviors in undergraduate college women.
Jones, Michelle D; Crowther, Janis H
2013-01-01
The present study examined various factors from the interactive and sociocultural models of bulimia nervosa as predictors of the onset of compensatory behaviors. Participants (n=237) completed a series of questionnaires assessing dietary restraint, body dissatisfaction, negative affect, binge eating, perfectionism, and self-esteem at two time points one year apart. Women who did not engage in compensatory behaviors at time one but did engage in compensatory behaviors at time two (n=21) were compared to women who engaged in compensatory behaviors at both time points (n=28) and women who did not engage in compensatory behaviors at either time point (n=188). Body dissatisfaction and perfectionism at time one significantly predicted women who began using compensatory behaviors compared to women who did not engage in compensatory behaviors at either time point. Women who experienced an onset of compensatory behaviors also reported significantly greater body dissatisfaction at time 1 than women who engaged in compensatory behaviors for the duration of the study. Implications and limitations of these findings are discussed. Copyright © 2012 Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-18
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2010-0229; FRL-8816-8] Pet Spot-On Analysis and... registered pet spot-on products to control fleas and ticks and a mitigation plan. The analysis consists of a Technical Review Document and Data Evaluation Records for pet spot-on products. The Agency is requesting...
NASA Astrophysics Data System (ADS)
Adila, I.; Dewi, W. W. A.; Tamitiadini, D.; Syauki, W. R.
2017-06-01
This study wants to address on how communication science is applied to Disaster Mitigation Plan. Especially, the implementation of Community Media and Development of Communication Technology that synergize to create a Disaster Mitigation Medium, which is appropriate for typology of Indonesia. Various levels of priorities that include disaster mitigation information, namely, increasing chain system of early warning systems, building evacuation, improving alertness and capacity to face a disaster, as well as minimizing disaster risk factor. Through this concept, mitigation actions plan of Tulungagung Coastal areas is expected to be applied in other regions in Indonesia by BNPB (Badan Nasional Penanggulangan Bencana). Having this strategy to be implemented based on region characteristics, it is expected that risk reduction process can be run optimally. As a result, the strategy is known as Community-Based Disaster Risk Reduction (PRBBK), which means as the organized-efforts by society for pra-, during, and post- disaster by using available resources as much as possible to prevent, reduce, avoid, and recover from the impact of disasters. Therefore, this result can be a Pilot Project for BNBP Indonesia, as a government decisive attitude for the next steps in protecting people residing in the region prone to natural disasters all over Indonesia.
CO2 Mitigation Measures of Power Sector and Its Integrated Optimization in China
Dai, Pan; Chen, Guang; Zhou, Hao; Su, Meirong; Bao, Haixia
2012-01-01
Power sector is responsible for about 40% of the total CO2 emissions in the world and plays a leading role in climate change mitigation. In this study, measures that lower CO2 emissions from the supply side, demand side, and power grid are discussed, based on which, an integrated optimization model of CO2 mitigation (IOCM) is proposed. Virtual energy, referring to energy saving capacity in both demand side and the power grid, together with conventional energy in supply side, is unified planning for IOCM. Consequently, the optimal plan of energy distribution, considering both economic benefits and mitigation benefits, is figured out through the application of IOCM. The results indicate that development of demand side management (DSM) and smart grid can make great contributions to CO2 mitigation of power sector in China by reducing the CO2 emissions by 10.02% and 12.59%, respectively, in 2015, and in 2020. PMID:23213305
1983-01-01
7 A-A147 693 HARRY S TRUMAN D’AM AND RESERVOIR MISSOURI MITIGATION OF 1/ THE ADVERSE EFFEC. .0) ILLINOIS STATE MUSEUM SOCIETY SPRINGFIELD d d...BUREAU OF STANDARDS-.1963-A 1 2 qZTM II 0A MITIGATION OF THE ADVERSE EFFECTS UPON THE LOCAL PALEONTOLOGICAL RESOURCES OF THE HARRY S. TRUMAN DAM AND...RESERVOIR OSAGE RIVER BASIN, MISSOURI FINAL REPORT OF FINDINGS VOLUME II: PLAN MAPS OF EXCAVATIONS by Jeffrey J. Saunders, Ph.D. Illinois State Museum
Analysis of Governance and Management (GM) Approach Agility During the Vancouver 2010 Olympic Games
2011-10-01
learning, compensatory, anticipatory or adaptive) that will change the collective’s parameters (i.e., size, resistance, and stiffness) allowing it...engage in learning and/or anticipatory behaviours. These behaviours aim to help the collective reach, maintain, and be comfortable with the ADR, DI... anticipatory behaviours could consist of contingency planning, mission analysis, etc. In this first phase, anticipatory behaviours are focused on
ERIC Educational Resources Information Center
General Accounting Office, Washington, DC. Div. of Human Resources.
Chapter 1 was created from its predecessor, Title 1, in order to give more flexibility to states and local school districts. Many of the requirements and criteria of Title 1 were relaxed in 1981 when Chapter 1 began. Districts are now required to submit written plans of their new Chapter 1 organization assuring the comparability of services…
Success in transmitting hazard science
NASA Astrophysics Data System (ADS)
Price, J. G.; Garside, T.
2010-12-01
Money motivates mitigation. An example of success in communicating scientific information about hazards, coupled with information about available money, is the follow-up action by local governments to actually mitigate. The Nevada Hazard Mitigation Planning Committee helps local governments prepare competitive proposals for federal funds to reduce risks from natural hazards. Composed of volunteers with expertise in emergency management, building standards, and earthquake, flood, and wildfire hazards, the committee advises the Nevada Division of Emergency Management on (1) the content of the State’s hazard mitigation plan and (2) projects that have been proposed by local governments and state agencies for funding from various post- and pre-disaster hazard mitigation programs of the Federal Emergency Management Agency. Local governments must have FEMA-approved hazard mitigation plans in place before they can receive this funding. The committee has been meeting quarterly with elected and appointed county officials, at their offices, to encourage them to update their mitigation plans and apply for this funding. We have settled on a format that includes the county’s giving the committee an overview of its infrastructure, hazards, and preparedness. The committee explains the process for applying for mitigation grants and presents the latest information that we have about earthquake hazards, including locations of nearby active faults, historical seismicity, geodetic strain, loss-estimation modeling, scenarios, and documents about what to do before, during, and after an earthquake. Much of the county-specific information is available on the web. The presentations have been well received, in part because the committee makes the effort to go to their communities, and in part because the committee is helping them attract federal funds for local mitigation of not only earthquake hazards but also floods (including canal breaches) and wildfires, the other major concerns in Nevada. Local citizens appreciate the efforts of the state officials to present the information in a public forum. The Committee’s earthquake presentations to the counties are supplemented by regular updates in the two most populous counties during quarterly meetings of the Nevada Earthquake Safety Council, generally alternating between Las Vegas and Reno. We have only 17 counties in Nevada, so we are making good progress at reaching each within a few years. The Committee is also learning from the county officials about their frustrations in dealing with the state and federal bureaucracies. Success is documented by the mitigation projects that FEMA has funded.
Albeni Falls Wildlife Protection, Mitigation, and Enhancement Plan, Final Report 1987.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Martin, Robert C.
1988-08-01
A wildlife impact assessment and mitigation plan has been developed for the US Army Corps of Engineers Albeni Falls Project in northern Idaho. The Habitat Evaluation Procedure (HEP) was used to evaluate pre- and post-construction habitat conditions at the Albeni Falls Project. There were 6617 acres of wetlands converted to open water due to development and operation of the project. Eight evaluation species were selected with impacts expressed in numbers of Habitat Units (HU's). For a given species, one HU is equivalent to one acre of prime habitat. The Albeni Falls Project resulted in estimated losses of 5985 mallard HU's,more » 4699 Canada goose HU's, 3379 redhead HU's, 4508 breeding bald eagle HU's, 4365 wintering bald eagle HU's, 2286 black-capped chickadee HU's, 1680 white-tailed deer HU's, and 1756 muskrat HU's. The yellow warbler gained 71 HU's. Therefore, total target species estimated impacts were 28,587 HU's. Impacts on peregrine falcons were not quantified in terms of HU's. Projects have been proposed by an interagency team of biologists to mitigate the impacts of Albeni Falls on wildlife. The HEP was used to estimate benefits of proposed mitigation projects to target species. Through a series of proposed protection and enhancement actions, the mitigation plan will provide benefits of an estimated 28,590 target species HU's to mitigate Albeni Falls wildlife habitat values lost. 52 refs., 9 figs., 14 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Casey, Daniel; Malta, Patrick
Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less
Director, Operational Test and Evaluation FY 2014 Annual Report
2015-01-01
Federal Departments and Agencies. Mitigation measures such as curtailment of wind turbine operations during test periods, identification of alternative...impact of wind turbines on ground-based and airborne radars, and this investment may help mitigate interference of wind turbines with test range...Frequency Active (SURTASS CLFA) Test Plan Tactical Unmanned Aircraft System Tactical Common Data Link (Shadow) FOT&E OTA Test Plan Tempest Wind 2014
Margaret A. Reams; Terry K. Haines; Cheryl R. Renner; Michael W. Wascom; Harish Kingre
2005-01-01
The dramatic expansion into the WildlandâUrban Interface (WUI) places property, natural assets, and human life at risk from wildfire destruction. The U.S. National Fire Plan encourages communities to implement laws and outreach programs for pre-fire planning to mitigate the risk to area residents. Starting in 2003, we surveyed the administrators of regulatory and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-12-01
The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less
30 CFR 250.223 - What mitigation measures information must accompany the EP?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What mitigation measures information must accompany the EP? 250.223 Section 250.223 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE... Contents of Exploration Plans (ep) § 250.223 What mitigation measures information must accompany the EP? (a...
establishing a plan to allocate any funds the State receives from the Volkswagen Mitigation Trust Agreement Volkswagen Mitigation Trust Agreement; to offset oxides of nitrogen emissions from vehicles. For more
44 CFR 201.6 - Local Mitigation Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... agencies that have the authority to regulate development, as well as businesses, academia and other private... and development trends within the community so that mitigation options can be considered in future...
Vertical control in the Class III compensatory treatment.
Sobral, Márcio Costa; Habib, Fernando A L; Nascimento, Ana Carla de Souza
2013-01-01
Compensatory orthodontic treatment, or simply orthodontic camouflage, consists in an important alternative to orthognathic surgery in the resolution of skeletal discrepancies in adult patients. It is important to point that, to be successfully performed, diagnosis must be detailed, to evaluate, specifically, dental and facial features, as well as the limitations imposed by the magnitude of the discrepancy. The main complaint, patient's treatment expectation, periodontal limits, facial pattern and vertical control are some of the items to be explored in the determination of the viability of a compensatory treatment. Hyperdivergent patients who present with a Class III skeletal discrepancy, associated with a vertical facial pattern, with the presence or tendency to anterior open bite, deserve special attention. In these cases, an efficient strategy of vertical control must be planned and executed. The present article aims at illustrating the evolution of efficient alternatives of vertical control in hiperdivergent patients, from the use, in the recent past, of extraoral appliances on the lower dental arch (J-hook), until nowadays, with the advent of skeletal anchorage. But for patients with a more balanced facial pattern, the conventional mechanics with Class III intermaxillary elastics, associated to an accentuated curve of Spee in the upper arch and a reverse curve of Spee in the lower arch, and vertical elastics in the anterior region, continues to be an excellent alternative, if there is extreme collaboration in using the elastics.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Compensatory Time Off for Travel § 550.1403 Definitions. In this subpart: Accrued compensatory time off means... pay limitations. Compensatory time off means compensatory time off for travel that is credited under... of determining whether travel time is compensable for the purpose of determining overtime pay...
Code of Federal Regulations, 2014 CFR
2014-01-01
...) Compensatory Time Off for Travel § 550.1403 Definitions. In this subpart: Accrued compensatory time off means... pay limitations. Compensatory time off means compensatory time off for travel that is credited under... of determining whether travel time is compensable for the purpose of determining overtime pay...
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Compensatory Time Off for Travel § 550.1403 Definitions. In this subpart: Accrued compensatory time off means... pay limitations. Compensatory time off means compensatory time off for travel that is credited under... of determining whether travel time is compensable for the purpose of determining overtime pay...
Code of Federal Regulations, 2013 CFR
2013-01-01
...) Compensatory Time Off for Travel § 550.1403 Definitions. In this subpart: Accrued compensatory time off means... pay limitations. Compensatory time off means compensatory time off for travel that is credited under... of determining whether travel time is compensable for the purpose of determining overtime pay...
Code of Federal Regulations, 2012 CFR
2012-01-01
...) Compensatory Time Off for Travel § 550.1403 Definitions. In this subpart: Accrued compensatory time off means... pay limitations. Compensatory time off means compensatory time off for travel that is credited under... of determining whether travel time is compensable for the purpose of determining overtime pay...
NASA Astrophysics Data System (ADS)
Thorne, James H.; Huber, Patrick R.; O'Donoghue, Elizabeth; Santos, Maria J.
2014-05-01
Globally, urban areas are expanding, and their regional, spatially cumulative, environmental impacts from transportation projects are not typically assessed. However, incorporation of a Regional Advance Mitigation Planning (RAMP) framework can promote more effective, ecologically sound, and less expensive environmental mitigation. As a demonstration of the first phase of the RAMP framework, we assessed environmental impacts from 181 planned transportation projects in the 19 368 km2 San Francisco Bay Area. We found that 107 road and railroad projects will impact 2411-3490 ha of habitat supporting 30-43 threatened or endangered species. In addition, 1175 ha of impacts to agriculture and native vegetation are expected, as well as 125 crossings of waterways supporting anadromous fish species. The extent of these spatially cumulative impacts shows the need for a regional approach to associated environmental offsets. Many of the impacts were comprised of numerous small projects, where project-by-project mitigation would result in increased transaction costs, land costs, and lost project time. Ecological gains can be made if a regional approach is taken through the avoidance of small-sized reserves and the ability to target parcels for acquisition that fit within conservation planning designs. The methods are straightforward, and can be used in other metropolitan areas.
The Office of General Counsel (OGC) has an ongoing business process engineering and business process automation initiative which has helped the office reduce administrative labor costs while increasing employee effectiveness. Supporting this effort is a system of automated routines accessible through a portal' interface called OGC Dashboard. The dashboard helps OGC track work progress, legal case load, written work products such as legal briefs and advice, and scheduling processes such as employee leave plans (via calendar) and travel compensatory time off.
Moshier, Samantha J; Landau, Aaron J; Hearon, Bridget A; Stein, Aliza T; Greathouse, Lee; Smits, Jasper A J; Otto, Michael W
2016-01-01
Compensatory eating in response to exercise may be an obstacle to achieving weight-loss and fitness goals. In this study we develop and conduct a preliminary examination of the psychometric properties of the Compensatory Eating Motives Questionnaire (CEMQ), a self-report questionnaire of motives for compensatory eating. Development and testing of the CEMQ was conducted in two student samples. Of respondents, 75% reported engaging in compensatory eating. Factor analysis yielded factors representing three domains of motives for compensatory eating: Eating for Reward, Eating for Recovery, and Eating for Relief. Internal consistency of the factors was adequate, and the factor structure was replicated. Correlations between the CEMQ subscales and trait questionnaires supported hypotheses for convergent and divergent validity. These results encourage further investigation of compensatory eating as a potential obstacle to weight loss, and support the continued assessment of the CEMQ as a tool to measure three conceptually distinct motives for compensatory eating.
Hungry Horse Mitigation; Flathead Lake, 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2005-06-01
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.« less
Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2008-12-22
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
Hungry Horse Mitigation; Flathead Lake, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2006-06-01
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2009-08-06
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
Developing a congestion mitigation toolbox.
DOT National Transportation Integrated Search
2011-09-30
Researchers created A Michigan Toolbox for Mitigating Traffic Congestion to be a useful desk reference for practitioners and an educational tool for elected officials acting through public policy boards to better understand the development, planning,...
Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-10-01
The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less
OnabotulinumtoxinA therapy for compensatory hyperhidrosis.
Adefusika, Jessica A; Brewer, Jerry D
2013-09-01
Compensatory hyperhidrosis due to the treatment for focal primary hyperhidrosis can be devastating and life-altering. The purpose of this paper is to discuss use of the iodine starch test and dilute botulinum toxin to decrease compensatory hyperhidrosis over large surface areas. A large area of the trunk affected by compensatory hyperhidrosis was treated with dilute botulinum toxin therapy using a starch iodine test for localization. The patient had exceptional results with his compensatory truncal sweating returning to normal and remaining stable for multiple months. Treating compensatory hyperhidrosis of large surface areas with dilute botulinum toxin therapy is effective and safe. © 2013 Wiley Periodicals, Inc.
SU-E-J-15: A Patient-Centered Scheme to Mitigate Impacts of Treatment Setup Error
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yang, L; Southern Medical University, Guangzhou; Tian, Z
2014-06-01
Purpose: Current Intensity Modulated Radiation Therapy (IMRT) is plan-centered. At each treatment fraction, we position the patient to match the setup in treatment plan. Inaccurate setup can compromise delivered dose distribution, and hence leading to suboptimal treatments. Moreover, current setup approach via couch shift under image guidance can correct translational errors, while rotational and deformation errors are hard to address. To overcome these problems, we propose in this abstract a patient-centered scheme to mitigate impacts of treatment setup errors. Methods: In the patient-centered scheme, we first position the patient on the couch approximately matching the planned-setup. Our Supercomputing Online Replanningmore » Environment (SCORE) is then employed to design an optimal treatment plan based on the daily patient geometry. It hence mitigates the impacts of treatment setup error and reduces the requirements on setup accuracy. We have conducted simulations studies in 10 head-and-neck (HN) patients to investigate the feasibility of this scheme. Rotational and deformation setup errors were simulated. Specifically, 1, 3, 5, 7 degrees of rotations were put on pitch, roll, and yaw directions; deformation errors were simulated by splitting neck movements into four basic types: rotation, lateral bending, flexion and extension. Setup variation ranges are based on observed numbers in previous studies. Dosimetric impacts of our scheme were evaluated on PTVs and OARs in comparison with original plan dose with original geometry and original plan recalculated dose with new setup geometries. Results: With conventional plan-centered approach, setup error could lead to significant PTV D99 decrease (−0.25∼+32.42%) and contralateral-parotid Dmean increase (−35.09∼+42.90%). The patientcentered approach is effective in mitigating such impacts to 0∼+0.20% and −0.03∼+5.01%, respectively. Computation time is <128 s. Conclusion: Patient-centered scheme is proposed to mitigate setup error impacts using replanning. Its superiority in terms of dosimetric impacts and feasibility has been shown through simulation studies on HN cases.« less
29 CFR 553.26 - Cash overtime payments.
Code of Federal Regulations, 2010 CFR
2010-07-01
...)-Compensatory Time and Compensatory Time Off § 553.26 Cash overtime payments. (a) Overtime compensation due under section 7 may be paid in cash at the employer's option, in lieu of providing compensatory time off... from freely substituting cash, in whole or part, for compensatory time off; and overtime payment in...
29 CFR 553.26 - Cash overtime payments.
Code of Federal Regulations, 2011 CFR
2011-07-01
...)-Compensatory Time and Compensatory Time Off § 553.26 Cash overtime payments. (a) Overtime compensation due under section 7 may be paid in cash at the employer's option, in lieu of providing compensatory time off... from freely substituting cash, in whole or part, for compensatory time off; and overtime payment in...
A Michigan toolbox for mitigating traffic congestion.
DOT National Transportation Integrated Search
2011-09-30
"Researchers created A Michigan Toolbox for Mitigating Traffic Congestion to be a useful desk reference : for practitioners and an educational tool for elected officials acting through public policy boards to better : understand the development, plan...
Head, Elizabeth; Rofina, Jaime; Zicker, Steven
2008-01-01
Decline in cognitive functions that accompany aging in dogs may have a biologic basis, and many of the disorders associated with aging in dogs may be mitigated through dietary modifications that incorporate specific nutraceuticals. Based on previous research and the results of laboratory and clinical studies, antioxidants may be one class of nutraceutical that provides benefits to aged dogs. Brains of aged dogs accumulate oxidative damage to proteins and lipids, which may lead to dysfunction of neuronal cells. The production of free radicals and lack of increase in compensatory antioxidant enzymes may lead to detrimental modifications to important macromolecules within neurons. Reducing oxidative damage through food ingredients rich in a broad spectrum of antioxidants significantly improves, or slows the decline of, learning and memory in aged dogs.
43 CFR 10005.15 - Planning and management techniques applicable to the plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... applicable to the plan. 10005.15 Section 10005.15 Public Lands: Interior Regulations Relating to Public Lands... AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.15 Planning and management techniques applicable to the plan. The Commission recognizes that there are a wide range of techniques that...
Improving Empirical Approaches to Estimating Local Greenhouse Gas Emissions
NASA Astrophysics Data System (ADS)
Blackhurst, M.; Azevedo, I. L.; Lattanzi, A.
2016-12-01
Evidence increasingly indicates our changing climate will have significant global impacts on public health, economies, and ecosystems. As a result, local governments have become increasingly interested in climate change mitigation. In the U.S., cities and counties representing nearly 15% of the domestic population plan to reduce 300 million metric tons of greenhouse gases over the next 40 years (or approximately 1 ton per capita). Local governments estimate greenhouse gas emissions to establish greenhouse gas mitigation goals and select supporting mitigation measures. However, current practices produce greenhouse gas estimates - also known as a "greenhouse gas inventory " - of empirical quality often insufficient for robust mitigation decision making. Namely, current mitigation planning uses sporadic, annual, and deterministic estimates disaggregated by broad end use sector, obscuring sources of emissions uncertainty, variability, and exogeneity that influence mitigation opportunities. As part of AGU's Thriving Earth Exchange, Ari Lattanzi of City of Pittsburgh, PA recently partnered with Dr. Inez Lima Azevedo (Carnegie Mellon University) and Dr. Michael Blackhurst (University of Pittsburgh) to improve the empirical approach to characterizing Pittsburgh's greenhouse gas emissions. The project will produce first-order estimates of the underlying sources of uncertainty, variability, and exogeneity influencing Pittsburgh's greenhouse gases and discuss implications of mitigation decision making. The results of the project will enable local governments to collect more robust greenhouse gas inventories to better support their mitigation goals and improve measurement and verification efforts.
5 CFR 550.1406 - Use of accrued compensatory time off.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1406 Use of accrued compensatory time off. (a) An employee must request permission from his or her supervisor to schedule the use of his... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Use of accrued compensatory time off. 550...
5 CFR 550.1406 - Use of accrued compensatory time off.
Code of Federal Regulations, 2012 CFR
2012-01-01
... PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1406 Use of accrued compensatory time off. (a) An employee must request permission from his or her supervisor to schedule the use of his... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Use of accrued compensatory time off. 550...
5 CFR 550.1406 - Use of accrued compensatory time off.
Code of Federal Regulations, 2013 CFR
2013-01-01
... PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1406 Use of accrued compensatory time off. (a) An employee must request permission from his or her supervisor to schedule the use of his... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Use of accrued compensatory time off. 550...
5 CFR 550.1408 - Prohibition against payment for unused compensatory time off.
Code of Federal Regulations, 2012 CFR
2012-01-01
... compensatory time off. 550.1408 Section 550.1408 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1408 Prohibition against payment for unused compensatory time off. As provided by 5 U.S.C. 5550b(b), an individual may not...
5 CFR 550.1407 - Forfeiture of unused compensatory time off.
Code of Federal Regulations, 2011 CFR
2011-01-01
... REGULATIONS PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1407 Forfeiture of unused..., may extend the time limit for using such compensatory time off for travel for up to an additional 26... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Forfeiture of unused compensatory time...
5 CFR 550.1407 - Forfeiture of unused compensatory time off.
Code of Federal Regulations, 2014 CFR
2014-01-01
... REGULATIONS PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1407 Forfeiture of unused..., may extend the time limit for using such compensatory time off for travel for up to an additional 26... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Forfeiture of unused compensatory time...
5 CFR 550.1406 - Use of accrued compensatory time off.
Code of Federal Regulations, 2014 CFR
2014-01-01
... PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1406 Use of accrued compensatory time off. (a) An employee must request permission from his or her supervisor to schedule the use of his... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Use of accrued compensatory time off. 550...
5 CFR 550.1408 - Prohibition against payment for unused compensatory time off.
Code of Federal Regulations, 2010 CFR
2010-01-01
... compensatory time off. 550.1408 Section 550.1408 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1408 Prohibition against payment for unused compensatory time off. As provided by 5 U.S.C. 5550b(b), an individual may not...
5 CFR 550.1408 - Prohibition against payment for unused compensatory time off.
Code of Federal Regulations, 2013 CFR
2013-01-01
... compensatory time off. 550.1408 Section 550.1408 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1408 Prohibition against payment for unused compensatory time off. As provided by 5 U.S.C. 5550b(b), an individual may not...
5 CFR 550.1407 - Forfeiture of unused compensatory time off.
Code of Federal Regulations, 2013 CFR
2013-01-01
... REGULATIONS PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1407 Forfeiture of unused..., may extend the time limit for using such compensatory time off for travel for up to an additional 26... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Forfeiture of unused compensatory time...
5 CFR 550.1408 - Prohibition against payment for unused compensatory time off.
Code of Federal Regulations, 2014 CFR
2014-01-01
... compensatory time off. 550.1408 Section 550.1408 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1408 Prohibition against payment for unused compensatory time off. As provided by 5 U.S.C. 5550b(b), an individual may not...
5 CFR 550.1407 - Forfeiture of unused compensatory time off.
Code of Federal Regulations, 2012 CFR
2012-01-01
... REGULATIONS PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1407 Forfeiture of unused..., may extend the time limit for using such compensatory time off for travel for up to an additional 26... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Forfeiture of unused compensatory time...
5 CFR 550.1408 - Prohibition against payment for unused compensatory time off.
Code of Federal Regulations, 2011 CFR
2011-01-01
... compensatory time off. 550.1408 Section 550.1408 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1408 Prohibition against payment for unused compensatory time off. As provided by 5 U.S.C. 5550b(b), an individual may not...
5 CFR 550.1407 - Forfeiture of unused compensatory time off.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATIONS PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1407 Forfeiture of unused..., may extend the time limit for using such compensatory time off for travel for up to an additional 26... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Forfeiture of unused compensatory time...
5 CFR 550.1406 - Use of accrued compensatory time off.
Code of Federal Regulations, 2011 CFR
2011-01-01
... PAY ADMINISTRATION (GENERAL) Compensatory Time Off for Travel § 550.1406 Use of accrued compensatory time off. (a) An employee must request permission from his or her supervisor to schedule the use of his... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Use of accrued compensatory time off. 550...
Kelmer, Gal; Keegan, Kevin G; Kramer, Joanne; Wilson, David A; Pai, Frank P; Singh, Prableen
2005-04-01
To characterize compensatory movements of the head and pelvis that resemble lameness in horses. 17 adult horses. Kinematic evaluations were performed while horses trotted on a treadmill before and after shoe-induced lameness. Lameness was quantified and the affected limb determined by algorithms that measured asymmetry in vertical movement of the head and pelvis. Induced primary lameness and compensatory movements resembling lameness were assessed by the Friedman test. Association between induced lameness and compensatory movements was examined by regression analysis. Compensatory movements resembling lameness in the ipsilateral forelimb were seen with induced lameness of a hind limb. There was less downward and less upward head movement during and after the stance phase of the ipsilateral forelimb. Doubling the severity of lameness in the hind limb increased severity of the compensatory movements in the ipsilateral forelimb by 50%. Compensatory movements resembling lameness of the hind limb were seen after induced lameness in a forelimb. There was less upward movement of the pelvis after the stance phase of the contralateral hind limb and, to a lesser extent, less downward movement of the pelvis during the stance phase of the ipsilateral hind limb. Doubling the severity of lameness in the forelimb increased compensatory movements of the contralateral hind limb by 5%. Induced lameness in a hind limb causes prominent compensatory movements resembling lameness in the ipsilateral forelimb. Induced lameness in a forelimb causes slight compensatory movements resembling lameness in the ipsilateral and contralateral hind limbs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... the Exchange Act (15 U.S.C. 78m or 78o(d)) after it has made offers complying with this section, the... requirements of section 13 or 15(d) of the Exchange Act (15 U.S.C. 78m, 78o(d)) may rely on this section if it... of time before the date the irrevocable election to defer is made. (f) No integration with other...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, Greg; Marotz, Brian L.; Dunnigan, James
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less
Germaine Reyes-French; Timothy J. Cohen
1991-01-01
This paper outlines a mitigation program for pipeline construction impacts to oak tree habitat by describing the requirements for the Offsite Oak Mitigation Program for the All American Pipeline (AAPL) in Santa Barbara County, California. After describing the initial environmental analysis, the County regulatory structure is described under which the plan was required...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yde, Chis
1990-06-01
The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer wintermore » and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.« less
43 CFR 10005.17 - Plan development process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan development process. 10005.17 Section 10005.17 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION...'S MITIGATION AND CONSERVATION PLAN § 10005.17 Plan development process. Following adoption of the...
5 CFR 551.531 - Compensatory time off.
Code of Federal Regulations, 2013 CFR
2013-01-01
... paragraph (g) of this section. (e) Compensatory time off to an employee's credit as of May 14, 2007 must be... compensation under 5 U.S.C. chapter 81. (g) The dollar value of compensatory time off when it is liquidated is... head of an agency (or designee) may grant compensatory time off from an employee's tour of duty instead...
5 CFR 551.531 - Compensatory time off.
Code of Federal Regulations, 2011 CFR
2011-01-01
... paragraph (g) of this section. (e) Compensatory time off to an employee's credit as of May 14, 2007 must be... compensation under 5 U.S.C. chapter 81. (g) The dollar value of compensatory time off when it is liquidated is... head of an agency (or designee) may grant compensatory time off from an employee's tour of duty instead...
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1992-09-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less
RE-PLAN: An Extensible Software Architecture to Facilitate Disaster Response Planning
O’Neill, Martin; Mikler, Armin R.; Indrakanti, Saratchandra; Tiwari, Chetan; Jimenez, Tamara
2014-01-01
Computational tools are needed to make data-driven disaster mitigation planning accessible to planners and policymakers without the need for programming or GIS expertise. To address this problem, we have created modules to facilitate quantitative analyses pertinent to a variety of different disaster scenarios. These modules, which comprise the REsponse PLan ANalyzer (RE-PLAN) framework, may be used to create tools for specific disaster scenarios that allow planners to harness large amounts of disparate data and execute computational models through a point-and-click interface. Bio-E, a user-friendly tool built using this framework, was designed to develop and analyze the feasibility of ad hoc clinics for treating populations following a biological emergency event. In this article, the design and implementation of the RE-PLAN framework are described, and the functionality of the modules used in the Bio-E biological emergency mitigation tool are demonstrated. PMID:25419503
Lunar Dust Mitigation Technology Development
NASA Technical Reports Server (NTRS)
Hyatt, Mark J.; Deluane, Paul B.
2008-01-01
NASA s plans for implementing the Vision for Space Exploration include returning to the moon as a stepping stone for further exploration of Mars, and beyond. Dust on the lunar surface has a ubiquitous presence which must be explicitly addressed during upcoming human lunar exploration missions. While the operational challenges attributable to dust during the Apollo missions did not prove critical, the comparatively long duration of impending missions presents a different challenge. Near term plans to revisit the moon places a primary emphasis on characterization and mitigation of lunar dust. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems. This paper presents the current perspective and implementation of dust knowledge management and integration, and mitigation technology development activities within NASA s Exploration Technology Development Program. This work is presented within the context of the Constellation Program s Integrated Lunar Dust Management Strategy. The Lunar Dust Mitigation Technology Development project has been implemented within the ETDP. Project scope and plans will be presented, along with a a perspective on lessons learned from Apollo and forensics engineering studies of Apollo hardware. This paper further outlines the scientific basis for lunar dust behavior, it s characteristics and potential effects, and surveys several potential strategies for its control and mitigation both for lunar surface operations and within the working volumes of a lunar outpost.
Bigger is better: Improved nature conservation and economic returns from landscape-level mitigation.
Kennedy, Christina M; Miteva, Daniela A; Baumgarten, Leandro; Hawthorne, Peter L; Sochi, Kei; Polasky, Stephen; Oakleaf, James R; Uhlhorn, Elizabeth M; Kiesecker, Joseph
2016-07-01
Impact mitigation is a primary mechanism on which countries rely to reduce environmental externalities and balance development with conservation. Mitigation policies are transitioning from traditional project-by-project planning to landscape-level planning. Although this larger-scale approach is expected to provide greater conservation benefits at the lowest cost, empirical justification is still scarce. Using commercial sugarcane expansion in the Brazilian Cerrado as a case study, we apply economic and biophysical steady-state models to quantify the benefits of the Brazilian Forest Code (FC) under landscape- and property-level planning. We find that FC compliance imposes small costs to business but can generate significant long-term benefits to nature: supporting 32 (±37) additional species (largely habitat specialists), storing 593,000 to 2,280,000 additional tons of carbon worth $69 million to $265 million ($ pertains to U.S. dollars), and marginally improving surface water quality. Relative to property-level compliance, we find that landscape-level compliance reduces total business costs by $19 million to $35 million per 6-year sugarcane growing cycle while often supporting more species and storing more carbon. Our results demonstrate that landscape-level mitigation provides cost-effective conservation and can be used to promote sustainable development.
Determination of Section 404 Permit and Habitat Mitigation Requirements
DOT National Transportation Integrated Search
2012-09-01
The Arizona Department of Transportation (ADOT) is committed to developing habitat, mitigation, : monitoring, and maintenance plans that replace the loss of the functions and values of an area and : are self-sustaining, thereby providing long-term co...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-07
... Waterbody Construction and Mitigation Procedures and Request for Comments The staff of the Office of Energy...) and Wetland and Waterbody Construction and Mitigation Procedures (Procedures), dated January 17, 2003...
Trial by fire: Community Wildfire Protection Plans put to the test
Pamela J. Jakes; Victoria Sturtevant
2013-01-01
Research has found that community wildfire protection planning can make significant contributions to wildfire mitigation and preparedness, but can the planning process and resulting Community Wildfire Protection Plans make a difference to wildfire response and recovery? In case studies conducted in four USA communities with Community Wildfire Protection Plans in place...
29 CFR 553.25 - Conditions for use of compensatory time (“reasonable period”, “unduly disrupt”).
Code of Federal Regulations, 2010 CFR
2010-07-01
... OF STATE AND LOCAL GOVERNMENTS General Section 7(o)-Compensatory Time and Compensatory Time Off § 553... good faith expect to be able to grant within a reasonable period of his or her making a request for use of such time. (c) Reasonable period. (1) Whether a request to use compensatory time has been granted...
Identifying compensatory movement patterns in the upper extremity using a wearable sensor system.
Ranganathan, Rajiv; Wang, Rui; Dong, Bo; Biswas, Subir
2017-11-30
Movement impairments such as those due to stroke often result in the nervous system adopting atypical movements to compensate for movement deficits. Monitoring these compensatory patterns is critical for improving functional outcomes during rehabilitation. The purpose of this study was to test the feasibility and validity of a wearable sensor system for detecting compensatory trunk kinematics during activities of daily living. Participants with no history of neurological impairments performed reaching and manipulation tasks with their upper extremity, and their movements were recorded by a wearable sensor system and validated using a motion capture system. Compensatory movements of the trunk were induced using a brace that limited range of motion at the elbow. Our results showed that the elbow brace elicited compensatory movements of the trunk during reaching tasks but not manipulation tasks, and that a wearable sensor system with two sensors could reliably classify compensatory movements (~90% accuracy). These results show the potential of the wearable system to assess and monitor compensatory movements outside of a lab setting.
Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading
NASA Astrophysics Data System (ADS)
Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.
2012-12-01
Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.
Planning for Crew Exercise for Deep Space Mission Scenarios
NASA Technical Reports Server (NTRS)
Moore, E. Cherice; Ryder, Jeff
2015-01-01
Exercise which is necessary for maintaining crew health on-orbit and preparing the crew for return to 1G can be challenging to incorporate into spaceflight vehicles. Deep space missions will require further understanding of the physiological response to microgravity, understanding appropriate mitigations, and designing the exercise systems to effectively provide mitigations, and integrating effectively into vehicle design with a focus to support planned mission scenarios. Recognizing and addressing the constraints and challenges can facilitate improved vehicle design and exercise system incorporation.
Vegetation and other development options for mitigating urban air pollution impacts
In addition to installing air pollution control devices and reducing emissions activities, urban air pollution can be further mitigated through planning and design strategies including vegetation planting, building design, installing roadside and near source structures, and modif...
Code of Federal Regulations, 2014 CFR
2014-10-01
... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...
Code of Federal Regulations, 2010 CFR
2010-10-01
... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...
Code of Federal Regulations, 2013 CFR
2013-10-01
... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...
Code of Federal Regulations, 2011 CFR
2011-10-01
... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...
Code of Federal Regulations, 2012 CFR
2012-10-01
... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...
75 FR 54026 - Salvage and Marine Firefighting Requirements; Vessel Response Plans for Oil
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
... and Marine Firefighting Requirements; Vessel Response Plans for Oil AGENCY: Coast Guard, DHS. ACTION... vessel response plan salvage and marine firefighting requirements for tank vessels carrying oil. The... establish evidence that they have properly planned to mitigate oil outflow and to provide that information...
Dinitz, Laura B.
2008-01-01
With costs of natural disasters skyrocketing and populations increasingly settling in areas vulnerable to natural hazards, society is challenged to better allocate its limited risk-reduction resources. In 2000, Congress passed the Disaster Mitigation Act, amending the Robert T. Stafford Disaster Relief and Emergency Assistance Act (Robert T. Stafford Disaster Relief and Emergency Assistance Act, Pub. L. 93-288, 1988; Federal Emergency Management Agency, 2002, 2008b; Disaster Mitigation Act, 2000), mandating that State, local, and tribal communities prepare natural-hazard mitigation plans to qualify for pre-disaster mitigation grants and post-disaster aid. The Federal Emergency Management Agency (FEMA) was assigned to coordinate and implement hazard-mitigation programs, and it published information about specific mitigation-plan requirements and the mechanisms (through the Hazard Mitigation Grant Program-HMGP) for distributing funds (Federal Emergency Management Agency, 2002). FEMA requires that each community develop a mitigation strategy outlining long-term goals to reduce natural-hazard vulnerability, mitigation objectives and specific actions to reduce the impacts of natural hazards, and an implementation plan for those actions. The implementation plan should explain methods for prioritizing, implementing, and administering the actions, along with a 'cost-benefit review' justifying the prioritization. FEMA, along with the National Institute of Building Sciences (NIBS), supported the development of HAZUS ('Hazards U.S.'), a geospatial natural-hazards loss-estimation tool, to help communities quantify potential losses and to aid in the selection and prioritization of mitigation actions. HAZUS was expanded to a multiple-hazard version, HAZUS-MH, that combines population, building, and natural-hazard science and economic data and models to estimate physical damages, replacement costs, and business interruption for specific natural-hazard scenarios. HAZUS-MH currently performs analyses for earthquakes, floods, and hurricane wind. HAZUS-MH loss estimates, however, do not account for some uncertainties associated with the specific natural-hazard scenarios, such as the likelihood of occurrence within a particular time horizon or the effectiveness of alternative risk-reduction options. Because of the uncertainties involved, it is challenging to make informative decisions about how to cost-effectively reduce risk from natural-hazard events. Risk analysis is one approach that decision-makers can use to evaluate alternative risk-reduction choices when outcomes are unknown. The Land Use Portfolio Model (LUPM), developed by the U.S. Geological Survey (USGS), is a geospatial scenario-based tool that incorporates hazard-event uncertainties to support risk analysis. The LUPM offers an approach to estimate and compare risks and returns from investments in risk-reduction measures. This paper describes and demonstrates a hypothetical application of the LUPM for Ventura County, California, and examines the challenges involved in developing decision tools that provide quantitative methods to estimate losses and analyze risk from natural hazards.
A Comprehensive Approach to Emergency Planning
ERIC Educational Resources Information Center
Worsley, Tracy L.; Beckering, Don
2007-01-01
It is essential that the traditional emergency management structure be used as a framework for higher education emergency planning. The four phases of emergency management should be reflected in the architecture of all planning efforts. These include "preparedness," "response," "mitigation," and "recovery."…
VOR Gain Is Related to Compensatory Saccades in Healthy Older Adults
Anson, Eric R.; Bigelow, Robin T.; Carey, John P.; Xue, Qian-Li; Studenski, Stephanie; Schubert, Michael C.; Agrawal, Yuri
2016-01-01
Objective: Vestibulo-ocular reflex (VOR) gain is well-suited for identifying rotational vestibular dysfunction, but may miss partial progressive decline in age-related vestibular function. Since compensatory saccades might provide an alternative method for identifying subtle vestibular decline, we describe the relationship between VOR gain and compensatory saccades in healthy older adults. Methods: Horizontal VOR gain was measured in 243 subjects age 60 and older from the Baltimore Longitudinal Study of Aging using video head impulse testing (HIT). Saccades in each HIT were identified as either “compensatory” or “compensatory back-up,” i.e., same or opposite direction as the VOR response respectively. Saccades were also classified as “covert” (occurring during head movement) and “overt” (occurring after head movement). The relationship between VOR gain and percentage of HITs with saccades, as well as the relationship between VOR gain and saccade latency and amplitude, were evaluated using regression analyses adjusting for age, gender, and race. Results: In adjusted analyses, the percentage of HITs with compensatory saccades increased 4.5% for every 0.1 decrease in VOR gain (p < 0.0001). Overt compensatory saccade amplitude decreased 0.6° (p < 0.005) and latency increased 90 ms (p < 0.001) for every 0.1 increase in VOR gain. Covert back-up compensatory saccade amplitude increased 0.4° for every 0.1 increase in VOR gain. Conclusion: We observed significant relationships between VOR gain and compensatory saccades in healthy older adults. Lower VOR gain was associated with larger amplitude, shorter latency compensatory saccades. Compensatory saccades reflect underlying rotational vestibular hypofunction, and may be particularly useful at identifying partial vestibular deficits as occur in aging adults. PMID:27445793
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peelle, E.; Schweitzer, M.; Scharre, P.
1979-07-01
This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possiblemore » through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.« less
Silverstein, M L
2001-06-01
In this article I discuss compensatory structure, a concept from Kohut's (1971, 1977) psychology of the self that is not as familiar as Kohut's other views about the self. Compensatory structures are attempts to repair selfobject failure, usually by strengthening idealization or twinship in the face of mirroring deficits. Compensatory structures, particularly their early indications, can be detected on projective tests for identifying adaptive resources and treatment potential. The clinical identification of compensatory structures on test findings is described using Rorschach and Thematic Apperception Test (Murray, 1943) content. Particular attention is devoted to the 2-part process of demonstrating first, an injury to the self, and second, how attempts to recover from such injuries can be detected on projective tests. Clinical examples are provided, and the differentiation between compensatory structures and defenses and sublimation is discussed.
Influence of gait speed on stability: recovery from anterior slips and compensatory stepping.
Bhatt, T; Wening, J D; Pai, Y-C
2005-02-01
Falls precipitated by slipping are a major health concern, with the majority of all slip-related falls occurring during gait. Recent evidence shows that a faster and/or more anteriorly positioned center of mass (COM) is more stable against backward balance loss, and that compensatory stepping is the key to recovering stability upon balance loss. The purposes of this paper were to determine whether walking speed affected gait stability for backward balance loss at slip onset and touchdown of compensatory stepping, and whether compensatory stepping response resembled the regular gait pattern. Forty-seven young subjects were slipped unexpectedly either at a self-selected fast, natural or slow speed. Speed-related differences in stability at slip onset and touchdown of the subsequent compensatory step were analyzed using the COM position-velocity state. The results indicate that gait speed highly correlated with stability against backward balance loss at slip onset. The low COM velocity of the slow group was not sufficiently compensated for by a more anteriorly positioned COM associated with a shorter step length at slip onset. At touchdown of the compensatory step, the speed-related differences in stability diminished, due to the continued advantage of anterior COM positioning from a short compensatory step retained by the slow group, coupled with an increase in COM velocity. Compensatory step length and relative COM position altered as a function of gait speed, indicating the motor program for gait regulation may play a role in modulating the compensatory step.
Simon, Christa; Schmitter-Edgecombe, Maureen
2016-08-01
The use of compensatory strategies plays an important role in the ability of older adults to adapt to late-life memory changes. Even with the benefits associated with compensatory strategy use, little research has explored specific mechanisms associated with memory performance and compensatory strategies. Rather than an individual's objective memory performance directly predicting their use of compensatory strategies, it is possible that some other variables are indirectly influencing that relationship. The purpose of this study was to: (a) examine the moderating effects of cognitive reserve (CR) and (b) evaluate the potential mediating effects of memory self-efficacy on the relationship between objective memory performance and compensatory strategy use. Two structural equation models (SEM) were used to evaluate CR (latent moderator model) and memory self-efficacy (mediator model) in a sample of 155 community-dwelling older adults over the age of 55. The latent variable moderator model indicated that CR was not substantiated as a moderator variable in this sample (p = .861). However, memory self-efficacy significantly mediated the association between objective memory performance and compensatory strategy use (β = .22, 95% confidence interval, CI [.002, .437]). More specifically, better objective memory was associated with lower compensatory strategy use because of its relation to higher memory self-efficacy. These findings provide initial support for an explanatory framework of the relation between objective memory and compensatory strategy use in a healthy older adult population by identifying the importance of an individual's memory perceptions.
NASA Astrophysics Data System (ADS)
Athanasopoulou, Evanthia; Despoiniadou, Varvara; Dritsos, Stefanos
2008-07-01
This paper examines the effects of the mortal earthquake on the city of Aigio in Greece in 1995, with particular focus on urbanization and planning policies. It is based on interviews with experts and surveys on damage to buildings following this earthquake. The analysis takes into account several factors, such as exact location, land use, construction period and the height of damaged buildings. Furthermore, the relationship between the seismic damage and the postseismic construction development of Aigio is examined and the conclusion is reached that the Greek urban planning system needs to be better organized to prepare for seismic damage. To this end, the paper recommends a five-point discussion agenda for applying local planning to seismic mitigation.
L-325 Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durham, Robin E.; Sackschewsky, Michael R.
2008-09-30
This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades. It includes time-zero monitoring results for planting activities conducted in January 2008, annual survival monitoring for all planting years (2007 and 2008), and recommendations for the successful completion of DOE habitat mitigation commitments for this project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alexander, Amanda K.; Sackschewsky, Michael R.; Duberstein, Corey A.
In 2003 the U.S. Department of Energy (DOE) constructed an Emergency Vehicle Operations Course (EVOC) at the Hazardous Material Management and Emergency Response Training and Education Center (HAMMER) in the southern portion of the Hanford Site. Preliminary surveys during 2001 identified an active burrowing owl (Athene cunicularia) burrow and three burrowing owls within the proposed development area. Burrowing owls were classified as a federal species of concern, a Washington State ?candidate? species, a Washington Department of Fish and Wildlife priority species, and a Hanford Site Biological Resources Management Plan Level III resource. Therefore, the mitigation action plan for the projectmore » included the installation of twenty artificial burrows around EVOC in the spring of 2003. The mitigation plan established a success criterion of five percent annual use of the burrows by owls. In July 2005, a field survey of the EVOC burrow complex was conducted to determine use and demography at each site. Burrow locations were mapped and signs of activity (feces, owl tracks, castings, feathers) were recorded. Out of the twenty burrows, twelve were found to be active. Of the eight inactive burrows three appeared to have been active earlier in the 2005 breeding season. A total of nineteen owls were counted but demography could not be determined. It appears that the EVOC mitigation exceeded burrow use goals during 2005. Continued site monitoring and maintenance, according to mitigation plan guidelines should be conducted as prescribed.« less
44 CFR 201.7 - Tribal Mitigation Plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... buildings, infrastructure, and critical facilities located in the identified hazard areas; (B) An estimate... particular emphasis on new and existing buildings and infrastructure. (iii) An action plan describing how the...
How much do hazard mitigation plans cost? An analysis of federal grant data.
Jackman, Andrea M; Beruvides, Mario G
2013-01-01
Under the Disaster Mitigation Act of 2000 and Federal Emergency Management Agency's subsequent Interim Final Rule, the requirement was placed on local governments to author and gain approval for a Hazard Mitigation Plan (HMP) for the areas under their jurisdiction. Low completion percentages for HMPs--less than one-third of eligible governments--were found by an analysis conducted 3 years after the final deadline for the aforementioned legislation took place. Follow-up studies showed little improvement at 5 and 8 years after the deadline. It was hypothesized that the cost of a HMP is a significant factor in determining whether or not a plan is completed. A study was conducted using Boolean Matrix Analysis methods to determine what, if any, characteristics of a certain community will most influence the cost of a HMP. The frequency of natural hazards experienced by the planning area, the number of jurisdictions participating in the HMEP, the population, and population density were found to significantly affect cost. These variables were used in a regression analysis to determine their predictive power for cost. It was found that along with two interaction terms, the variables explain approximately half the variation in HMP cost.
Lower Clearwater Aquatic Mammal Survey. Final Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mack, Curt; Kronemann, Loren A.; Eneas, Cheryl
BPA provided funding to collect baseline data on river otters to assist in developing mitigation implementation plans for river otters percent to the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, sections 1003 (b)(2) and (3). Distribution, movements, habitat use, and diets of river otters were investigated in the Clearwater River within the Nez Perce Indian Reservation from 1991-1992. The study outlined recommendations to guide development of mitigation implementation plans for riparian habitats. Sections of the Clearwater River were identified that if protected or enhanced would provide optimal benefit to otters. Habitat improvement alternatives were also outlinedmore » which could be used to enhance otter habitats.« less
NASA Astrophysics Data System (ADS)
Weiss, S. B.
2013-12-01
The impacts of atmospheric nitrogen deposition on biodiversity are widespread and profound; N-inputs have far exceeded any historical range of variability and are altering ecosystem structure and function worldwide. Overwhelming scientific evidence documents acute threats to numerous California ecosystems and imperiled species through increased growth of invasive annual grasses and forbs, yet policy responses lag far behind the science. Since 2001, a confluence of several projects (gas-fired powerplants and highway improvements) in Santa Clara County set powerful precedents for mitigation of N-deposition impacts on ecosystems via the Endangered Species Act, with a focus on the Bay checkerspot butterfly. These projects have culminated in the Santa Clara Valley Habitat Plan, a 50-year $665,000,000 mitigation plan to conserve and manage habitat for 19 target species. Elsewhere, powerplants in San Diego and Contra Costa Counties have provided mitigation funds for habitat restoration and weed management. Building on these precedents, the California Invasive Plant Council, California Native Plant Society, and other groups are forming a coalition to extend this mitigation across California to generate money for weed management. Key elements of this incipient campaign include: 1) education of regulatory agencies, activists, and decision-makers about the threat; 2) generation of standard EIR comments with project specifics for developments that increase traffic or generate nitrogen emissions; 3) encouraging state and federal wildlife agencies to raise the issue in consultations and Habitat Conservation Plans; 4) policy and legal research to chart a course through the regulatory and political landscape; 5) collating research on impacts and development of tools to document those impacts; 6) media outreach, and 7) coalition building. The main mitigation strategy is funding for local weed management and stewardship groups through fees. There is a desperate need for stable long-term funding of weed management on parks, preserves and other wildlands, and mitigating N-deposition could provide one major source.
Buildings: Mitigation Opportunities with a Focus on Health Implications
For Frank Princiotta’s book, Global Climate Change—The Technology Challenge Addressing building energy use is the critical first step in any strategic plan for mitigating climate change. Buildings have a direct impact on estimated global climate change due to their large carbon ...
23 CFR 777.9 - Mitigation of impacts.
Code of Federal Regulations, 2010 CFR
2010-04-01
... existing degraded or historic wetlands or natural habitats through restoration or enhancement on or off... or natural habitats on or off site. Restoration of wetlands is generally preferable to enhancement or... transportation planning processes. (d) Mitigation or restoration of historic impacts to wetlands and natural...
23 CFR 777.9 - Mitigation of impacts.
Code of Federal Regulations, 2011 CFR
2011-04-01
... existing degraded or historic wetlands or natural habitats through restoration or enhancement on or off... or natural habitats on or off site. Restoration of wetlands is generally preferable to enhancement or... transportation planning processes. (d) Mitigation or restoration of historic impacts to wetlands and natural...
Designing climate change mitigation plans that add up.
Bajželj, Bojana; Allwood, Julian M; Cullen, Jonathan M
2013-07-16
Mitigation plans to combat climate change depend on the combined implementation of many abatement options, but the options interact. Published anthropogenic emissions inventories are disaggregated by gas, sector, country, or final energy form. This allows the assessment of novel energy supply options, but is insufficient for understanding how options for efficiency and demand reduction interact. A consistent framework for understanding the drivers of emissions is therefore developed, with a set of seven complete inventories reflecting all technical options for mitigation connected through lossless allocation matrices. The required data set is compiled and calculated from a wide range of industry, government, and academic reports. The framework is used to create a global Sankey diagram to relate human demand for services to anthropogenic emissions. The application of this framework is demonstrated through a prediction of per-capita emissions based on service demand in different countries, and through an example showing how the "technical potentials" of a set of separate mitigation options should be combined.
Crew Communication as a Factor in Aviation Accidents
NASA Technical Reports Server (NTRS)
Goguen, J.; Linde, C.; Murphy, M.
1986-01-01
The crew communication process is analyzed. Planning and explanation are shown to be well-structured discourse types, described by formal rules. These formal rules are integrated with those describing the other most important discourse type within the cockpit: the command-and-control speech act chain. The latter is described as a sequence of speech acts for making requests (including orders and suggestions), for making reports, for supporting or challenging statements, and for acknowledging previous speech acts. Mitigation level, a linguistic indication of indirectness and tentativeness in speech, was an important variable in several hypotheses, i.e., the speech of subordinates is more mitigated than the speech of superiors, the speech of all crewmembers is less mitigated when they know that they are in either a problem or emergency situation, and mitigation is a factor in failures of crewmembers to initiate discussion of new topics or have suggestions ratified by the captain. Test results also show that planning and explanation are more frequently performed by captains, are done more during crew- recognized problems, and are done less during crew-recognized emergencies. The test results also indicated that planning and explanation are more frequently performed by captains than by other crewmembers, are done more during crew-recognized problems, and are done less during-recognized emergencies.
Bigger is better: Improved nature conservation and economic returns from landscape-level mitigation
Kennedy, Christina M.; Miteva, Daniela A.; Baumgarten, Leandro; Hawthorne, Peter L.; Sochi, Kei; Polasky, Stephen; Oakleaf, James R.; Uhlhorn, Elizabeth M.; Kiesecker, Joseph
2016-01-01
Impact mitigation is a primary mechanism on which countries rely to reduce environmental externalities and balance development with conservation. Mitigation policies are transitioning from traditional project-by-project planning to landscape-level planning. Although this larger-scale approach is expected to provide greater conservation benefits at the lowest cost, empirical justification is still scarce. Using commercial sugarcane expansion in the Brazilian Cerrado as a case study, we apply economic and biophysical steady-state models to quantify the benefits of the Brazilian Forest Code (FC) under landscape- and property-level planning. We find that FC compliance imposes small costs to business but can generate significant long-term benefits to nature: supporting 32 (±37) additional species (largely habitat specialists), storing 593,000 to 2,280,000 additional tons of carbon worth $69 million to $265 million ($ pertains to U.S. dollars), and marginally improving surface water quality. Relative to property-level compliance, we find that landscape-level compliance reduces total business costs by $19 million to $35 million per 6-year sugarcane growing cycle while often supporting more species and storing more carbon. Our results demonstrate that landscape-level mitigation provides cost-effective conservation and can be used to promote sustainable development. PMID:27419225
NASA Astrophysics Data System (ADS)
Wilson, R. I.; Lynett, P. J.; Miller, K.; Eskijian, M.; Dengler, L. A.; Ayca, A.; Keen, A.; Admire, A. R.; Siegel, J.; Johnson, L. A.; Curtis, E.; Hornick, M.
2015-12-01
The 2010 Chile and 2011 Japan tsunamis both struck the California coast offering valuable experience and raised a number of significant issues for harbor masters, port captains, and other maritime entities. There was a general call for more planning products to help guide maritime communities in their tsunami response, mitigation, and recovery activities. The State of California is working with the U.S. Federal Emergency Management Agency (FEMA), the U.S. National Tsunami Hazard Mitigation Program (NTHMP), and other tsunami experts to provide communities with new tsunami planning tools to address these issues: Response Playbooks and plans have been developed for ports and harbors identifying potential tsunami current hazards and related damage for various size events. Maps have been generated showing minor, moderate, and severe damage levels that have been linked to current velocity thresholds of 3, 6, and 9 knots, respectively. Knowing this information allows harbor personnel to move ships or strengthen infrastructure prior to the arrival of distant source tsunamis. Damage probability tools and mitigation plans have been created to help reduce tsunami damage by evaluating the survivability of small and large vessels in harbors and ports. These results were compared to the actual damage assessments performed in California and Japan following the 2011 Japanese tsunami. Fragility curves were developed based on current velocity and direction to help harbor and port officials upgrade docks, piles, and related structures. Guidance documents are being generated to help in the development of both local and statewide recovery plans. Additional tools, like post-tsunami sediment and debris movement models, will allow harbors and ports to better understand if and where recovery issues are most likely to occur. Streamlining the regulatory and environmental review process is also a goal of the guidance. These maritime products and procedures are being integrated into guidance through the NTHMP to help other U.S. states/territories/commonwealths develop their own tsunami planning tools. This will lead to more accurate, consistent, and cost-effective tsunami planning strategies within the U.S.
Why Do Drivers Use Mobile Phones While Driving? The Contribution of Compensatory Beliefs.
Zhou, Ronggang; Yu, Mengli; Wang, Xinyi
2016-01-01
The current study is the first to investigate the contribution of compensatory beliefs (i.e., the belief that the negative effects of an unsafe behavior can be "neutralized" by engaging in another safe behavior; e.g., "I can use a mobile phone now because I will slow down ") on drivers' mobile phone use while driving. The effects of drivers' personal characteristics on compensatory beliefs, mobile phone use and self-regulatory behaviors were also examined. A series of questions were administered to drivers, which included (1) personal measures, (2) scales that measured compensatory beliefs generally in substance use and with regard to driving safety, and (3) questions to measure drivers' previous primary mobile phone usage and corresponding self-regulatory actions. Overall, drivers reported a low likelihood of compensatory beliefs, prior mobile phone use, and a strong frequency of self-regulatory behaviors. Respondents who had a higher tendency toward compensatory beliefs reported more incidents or crash involvement caused by making or answering calls and sending or reading messages. The findings provide strong support for the contribution of compensatory beliefs in predicting mobile phone usage in the context of driving. Compensatory beliefs can explain 41% and 43% of the variance in the active activities of making calls and texting/sending messages compared with 18% and 31% of the variance in the passive activities of answering calls and reading messages. Among the regression models for predicting self-regulatory behaviors at the tactical or operational level, compensatory beliefs emerge as significant predictors only in predicting shorter conversations while on a call. The findings and limitations of the current study are discussed.
50 CFR 216.275 - Requirements for monitoring and reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Navy shall complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management tool shall include: (1) A method for prioritizing monitoring projects that clearly... potentially modify subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for...
Religious belief as compensatory control.
Kay, Aaron C; Gaucher, Danielle; McGregor, Ian; Nash, Kyle
2010-02-01
The authors review experimental evidence that religious conviction can be a defensive source of compensatory control when personal or external sources of control are low. They show evidence that (a) belief in religious deities and secular institutions can serve as external forms of control that can compensate for manipulations that lower personal control and (b) religious conviction can also serve as compensatory personal control after experimental manipulations that lower other forms of personal or external control. The authors review dispositional factors that differentially orient individuals toward external or personal varieties of compensatory control and conclude that compensatory religious conviction can be a flexible source of personal and external control for relief from the anxiety associated with random and uncertain experiences.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen B.
This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projectsmore » (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public access. During the past two years, non-Indian public concern over big game hunting issues has at times overwhelmed other issues related to the wildlife area. In 2001, the CTUIR Fish and Wildlife Committee closed the wildlife area to tribal branch antlered bull elk harvest in response to harvest data that indicated harvest rates were greater than expected. In addition, illegal harvest of mature bull elk in southeastern Washington during the 2001 season exceeded the legal tribal and nontribal harvest combined which has created a potential significant regression in the bull;cow ratio in the Blue Mountain Elk herd. CTUIR Fish and Wildlife Committee and staff and Washington Department of Fish and Wildlife Regional Director and staff have been coordinating regularly to develop strategies to address harvest rates and ensure protection of viable big game herds in southeastern Washington. The CTUIR Fish and Wildlife Committee and WDFW has jointly agreed to continue close coordination on this and other issues and continue working together to ensure the long-term vigor of the elk herd on the Rainwater Wildlife Area. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources.« less
2008-05-01
AFRL-RH-WP-SR-2009-0002 The Influence of Tactual Seat-motion Cues on Training and Performance in a Roll-axis Compensatory Tracking Task...and Performance in a Roll-axis Compensatory Tracking Task Setting 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 62202F 6. AUTHOR(S...simulated vehicle having aircraft-like dynamics. A centrally located compensatory display, subtending about nine degrees, provided visual roll error
King, Laurie A.; Cohen, Rajal G.; Horak, Fay B.
2016-01-01
People with Parkinson disease (PD) who show freezing of gait also have dysfunction in cognitive domains that interact with mobility. Specifically, freezing of gait is associated with executive dysfunction involving response inhibition, divided attention or switching attention, and visuospatial function. The neural control impairments leading to freezing of gait have recently been attributed to higher-level, executive and attentional cortical processes involved in coordinating posture and gait rather than to lower-level, sensorimotor impairments. To date, rehabilitation for freezing of gait primarily has focused on compensatory mobility training to overcome freezing events, such as sensory cueing and voluntary step planning. Recently, a few interventions have focused on restitutive, rather than compensatory, therapy. Given the documented impairments in executive function specific to patients with PD who freeze and increasing evidence of overlap between cognitive and motor function, incorporating cognitive challenges with mobility training may have important benefits for patients with freezing of gait. Thus, a novel theoretical framework is proposed for exercise interventions that jointly address both the specific cognitive and mobility challenges of people with PD who freeze. PMID:26381808
Peterson, Daniel S; King, Laurie A; Cohen, Rajal G; Horak, Fay B
2016-05-01
People with Parkinson disease (PD) who show freezing of gait also have dysfunction in cognitive domains that interact with mobility. Specifically, freezing of gait is associated with executive dysfunction involving response inhibition, divided attention or switching attention, and visuospatial function. The neural control impairments leading to freezing of gait have recently been attributed to higher-level, executive and attentional cortical processes involved in coordinating posture and gait rather than to lower-level, sensorimotor impairments. To date, rehabilitation for freezing of gait primarily has focused on compensatory mobility training to overcome freezing events, such as sensory cueing and voluntary step planning. Recently, a few interventions have focused on restitutive, rather than compensatory, therapy. Given the documented impairments in executive function specific to patients with PD who freeze and increasing evidence of overlap between cognitive and motor function, incorporating cognitive challenges with mobility training may have important benefits for patients with freezing of gait. Thus, a novel theoretical framework is proposed for exercise interventions that jointly address both the specific cognitive and mobility challenges of people with PD who freeze. © 2016 American Physical Therapy Association.
Shimansky, Yury; Wang, Jian-Jun; Bauer, Richard A; Bracha, Vlastislav; Bloedel, James R
2004-03-01
Although the cerebellum has been shown to be critical for the acquisition and retention of adaptive modifications in certain reflex behaviors, this structure's role in the learning of motor skills required to execute complex voluntary goal-directed movements still is unclear. This study explores this issue by analyzing the effects of inactivating the interposed and dentate cerebellar nuclei on the adaptation required to compensate for an external elastic load applied during a reaching movement. We show that cats with these nuclei inactivated can adapt to predictable perturbations of the forelimb during a goal-directed reach by including a compensatory component in the motor plan prior to movement initiation. In contrast, when comparable compensatory modifications must be triggered on-line because the perturbations are applied in randomized trials (i.e., unpredictably), such adaptive responses cannot be executed or reacquired after the interposed and dentate nuclei are inactivated. These findings provide the first demonstration of the condition-dependent nature of the cerebellum's contribution to the learning of a specific volitional task.
Efficacy of memory aids after traumatic brain injury: A single case series.
Bos, Hannah R; Babbage, Duncan R; Leathem, Janet M
2017-01-01
Individuals living with traumatic brain injury commonly have difficulties with prospective memory-the ability to remember a planned action at the intended time. Traditionally a memory notebook has been recommended as a compensatory memory aid. Electronic devices have the advantage of providing a cue at the appropriate time to remind participants to refer to the memory aid and complete tasks. Research suggests these have potential benefit in neurorehabilitation. This study aimed to investigate the efficacy of a memory notebook and specifically a smartphone as a compensatory memory aid. A single case series design was used to assess seven participants. A no-intervention baseline was followed by training and intervention with either the smartphone alone, or a memory notebook and later the smartphone. Memory was assessed with weekly assigned memory tasks. Participants using a smartphone showed improvements in their ability to complete assigned memory tasks accurately and within the assigned time periods. Use of a smartphone provided additional benefits over and above those already seen for those who received a memory notebook first. Smartphones have the potential to be a useful and cost effective tool in neurorehabilitation practice.
Evald, Lars
2015-01-01
Use of assistive devices has been shown to be beneficial as a compensatory memory strategy among brain injury survivors, but little is known about possible advantages and disadvantages of the technology. As part of an intervention study participants were interviewed about their experiences with the use of low-cost, off-the-shelf, unmodified smartphones combined with Internet calendars as a compensatory memory strategy. Thirteen community-dwelling patients with traumatic brain injury (TBI) received a 6-week group-based instruction in the systematic use of a smartphone as a memory compensatory aid followed by a brief structured open-ended interview regarding satisfaction with and advantages and disadvantages of the compensatory strategy. Ten of 13 participants continued to use a smartphone as their primary compensatory strategy. Audible and visual reminders were the most frequently mentioned advantages of the smartphone, and, second, the capability as an all-in-one memory device. In contrast, battery life was the most often mentioned disadvantage, followed by concerns about loss or failure of the device. Use of a smartphone seems to be a satisfactory compensatory memory strategy to many patients with TBI and smartphones come with features that are advantageous to other compensatory strategies. However, some benefits come hand-in-hand with drawbacks, such as the feeling of dependency. These aspects should be taken into account when choosing assistive technology as a memory compensatory strategy.
Compensatory mechanisms mitigate the effect of warming and drought on wood formation.
Balducci, Lorena; Cuny, Henri E; Rathgeber, Cyrille B K; Deslauriers, Annie; Giovannelli, Alessio; Rossi, Sergio
2016-06-01
Because of global warming, high-latitude ecosystems are expected to experience increases in temperature and drought events. Wood formation will have to adjust to these new climatic constraints to maintain tree mechanical stability and long-distance water transport. The aim of this study is to understand the dynamic processes involved in wood formation under warming and drought. Xylogenesis, gas exchange, water relations and wood anatomy of black spruce [Picea mariana (Mill.) B.S.P.] saplings were monitored during a greenhouse experiment where temperature was increased during daytime or night-time (+6 °C) combined with a drought period. The kinetics of tracheid development expressed as rate and duration of the xylogenesis sub-processes were quantified using generalized additive models. Drought and warming had a strong influence on cell production, but little effect on wood anatomy. The increase in cell production rate under warmer temperatures, and especially during the night-time warming at the end of the growing season, resulted in wider tree-rings. However, the strong compensation between rates and durations of cell differentiation processes mitigates warming and drought effects on tree-ring structure. Our results allowed quantification of how wood formation kinetics is regulated when water and heat stress increase, allowing trees to adapt to future environmental conditions. © 2015 John Wiley & Sons Ltd.
Albeni Falls Wildlife Mitigation : Annual Report 2002.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Terra-Berns, Mary
The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less
NASA Astrophysics Data System (ADS)
Wilson, R. I.; Eble, M. C.
2013-12-01
The U.S. National Tsunami Hazard Mitigation Program (NTHMP) is comprised of representatives from coastal states and federal agencies who, under the guidance of NOAA, work together to develop protocols and products to help communities prepare for and mitigate tsunami hazards. Within the NTHMP are several subcommittees responsible for complimentary aspects of tsunami assessment, mitigation, education, warning, and response. The Mapping and Modeling Subcommittee (MMS) is comprised of state and federal scientists who specialize in tsunami source characterization, numerical tsunami modeling, inundation map production, and warning forecasting. Until September 2012, much of the work of the MMS was authorized through the Tsunami Warning and Education Act, an Act that has since expired but the spirit of which is being adhered to in parallel with reauthorization efforts. Over the past several years, the MMS has developed guidance and best practices for states and territories to produce accurate and consistent tsunami inundation maps for community level evacuation planning, and has conducted benchmarking of numerical inundation models. Recent tsunami events have highlighted the need for other types of tsunami hazard analyses and products for improving evacuation planning, vertical evacuation, maritime planning, land-use planning, building construction, and warning forecasts. As the program responsible for producing accurate and consistent tsunami products nationally, the NTHMP-MMS is initiating a multi-year plan to accomplish the following: 1) Create and build on existing demonstration projects that explore new tsunami hazard analysis techniques and products, such as maps identifying areas of strong currents and potential damage within harbors as well as probabilistic tsunami hazard analysis for land-use planning. 2) Develop benchmarks for validating new numerical modeling techniques related to current velocities and landslide sources. 3) Generate guidance and protocols for the production and use of new tsunami hazard analysis products. 4) Identify multistate collaborations and funding partners interested in these new products. Application of these new products will improve the overall safety and resilience of coastal communities exposed to tsunami hazards.
15 CFR 923.25 - Shoreline erosion/mitigation planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... purpose in developing this planning process is to give special attention to erosion issues. This special management attention may be achieved by designating erosion areas as areas of particular concern pursuant to...
Planning for Flood Recovery and Long-Term Resilience in Vermont
Vermont requested technical assistance from EPA and FEMA that focused on incorporating smart growth principles into state policies, local development regulations, and Hazard Mitigation Plans to increase community flood resilience.
Chen, Jun-Peng; Peng, A-Jing; Xu, Chen-Hui; Li, Guo-Ying
2017-01-01
Background The mechanism of compensatory hyperhidrosis remains unclear. The aim of this study was to explore the relationship between compensatory hyperhidrosis and thoracic sympathetic ganglion excitability to assess the effectiveness of thoracoscopic T4 sympathicotomy for treating palmar hyperhidrosis. Methods Sixty-six cases of T4 sympathetic ganglions were prospectively collected from patients with palmar hyperhidrosis who underwent thoracoscopic T4 sympathicotomy from 2013 to 2016 in our department. The expression levels of choline acetyltransferase (ChAT), vasoactive intestinal peptide (VIP), and synaptophysin were detected using immunohistochemistry. Patients with palmar hyperhidrosis were followed-up for examination of postoperative sweating status. Results Thirty-eight cases (57.6%) of compensatory hyperhidrosis were identified. Mild compensatory hyperhidrosis occurred in 26 patients (39.4%), moderate in 11 (16.7%), and severe in 1 (1.5%). The rate of compensatory hyperhidrosis was higher in patients with axilla hyperhidrosis than those without (76.0% vs. 46.3%, P=0.018). However, the clinical data were similar between the compensatory hyperhidrosis group and the no compensatory hyperhidrosis group. In addition, the ChAT, VIP, and synaptophysin expression levels were not significantly different between the two groups (P values of 0.356, 0.071, and 0.141, respectively). Furthermore, the ChAT, VIP, and synaptophysin expression levels in the mild group were similar to those observed in the moderate/intense group (P values of 0.089, 0.124, and 0.149, respectively). The remission rate was 100% in palmar hyperhidrosis, 48.2% (27/56) in pedal hyperhidrosis, 56.0% (14/25) in axilla hyperhidrosis and 88.9% (16/18) in skin symptoms. No signs of chapped skin on the palms were found. Conclusions There was no significant correlation between compensatory hyperhidrosis and thoracic sympathetic ganglion excitability; however, compensatory hyperhidrosis is more likely to simultaneously occur in patients with axilla hyperhidrosis. The satisfactory efficacy of thoracoscopic T4 sympathicotomy indicates that it may an ideal technique for palmar hyperhidrosis. PMID:29221281
44 CFR 201.4 - Standard State Mitigation Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... reduce risks from natural hazards and serves as a guide for State decision makers as they commit resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... risk assessments must characterize and analyze natural hazards and risks to provide a statewide...
50 CFR 216.175 - Requirements for monitoring and reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management... subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for standardizing data... Report—The Navy shall submit a report annually on October 1 describing the implementation and results...
The Compensatory ADHD Behaviors Scale (CABS): Development and Initial Validation.
Castagna, Peter J; Roye, Scott; Calamia, Matthew
2018-05-01
Several measures are available that assess inattention, hyperactivity/impulsivity, and executive functioning deficits. Treatments for adults with attention-deficit/hyperactivity disorder (ADHD) and skill-based academic interventions focus on improving compensatory strategies to ameliorate functional impairment; however, no measure exists that examines the compensatory behaviors adults utilize to compensate for the functional deficits associated with inattention and hyperactivity/impulsivity. The current study aimed to determine the psychometric properties of the Compensatory ADHD Behaviors Scale (CABS). Five-hundred participants ( M age = 36.83, SD = 11.57) completed measures of ADHD symptomatology, executive functioning, functional impairment, mood disorder symptoms, and the CABS. Analyses revealed that scales assessing both use and effectiveness of compensatory behaviors subscales had similar factor structures, reflecting present- and future-oriented behaviors. The present-, but not future-oriented, behaviors significantly related to ADHD symptomatology, executive dysfunction, and functional impairment; effectiveness of present-oriented compensatory behaviors demonstrated incremental validity in predicting impairment. Compensatory strategies may be a useful variable to measure when examining functional impairment associated with inattention and hyperactivity/impulsivity. The current study provides preliminary evidence of the ability of CABS to validly measure various strategies associated with (clinical and subclinical) ADHD symptomatology, executive functioning, and overall impairment.
Eco-compensation in China: Theory, practices and suggestions for the future.
Shang, Wenxiu; Gong, Yicheng; Wang, Zhongjing; Stewardson, Michael J
2018-03-15
Eco-compensation is the most important form of compensatory conservation in China. However, this compensatory mechanism is criticized for vague definition and massive government participation. For better understanding of eco-compensation in China, this paper compares theories and practices of compensatory mechanisms in China and abroad. The analysis of theoretical backgrounds shows that eco-compensation in China is a combination of 'ecological compensation' and 'payments for ecosystem services'. Ten compensatory projects in China and abroad are assessed to reveal characteristics and problems of eco-compensation in China. The results show that compensatory projects in China lagged behind mature foreign compensatory projects in clarity of property rights, responsibility fulfillment, executive efficiency, effectiveness, sustainability and equality. The massive participation of the government is the major reason for the poor performance of compensatory projects in China. However, government participation is necessary at the present stage in China for the income gap and beneficiaries' low willingness to pay. For the improvement of eco-compensation in China, suggestions are given on the choice of non-market valuation methods, the creation of property rights and the establishment of market mechanisms. Copyright © 2018 Elsevier Ltd. All rights reserved.
Desai, Arti D; Jacob-Files, Elizabeth A; Wignall, Julia; Wang, Grace; Pratt, Wanda; Mangione-Smith, Rita; Britto, Maria T
2018-06-05
Shared care plans play an essential role in coordinating care across health care providers and settings for children with medical complexity (CMC). However, existing care plans often lack shared ownership, are out-of-date, and lack universal accessibility. In this study, we aimed to establish requirements for shared care plans to meet the information needs of caregivers and providers and to mitigate current information barriers when caring for CMC. We followed a user-centered design methodology and conducted in-depth semistructured interviews with caregivers and providers of CMC who receive care at a tertiary care children's hospital. We applied inductive, thematic analysis to identify salient themes. Analysis occurred concurrently with data collection; therefore, the interview guide was iteratively revised as new questions and themes emerged. Interviews were conducted with 17 caregivers and 22 providers. On the basis of participant perspectives, we identified 4 requirements for shared care plans that would help meet information needs and mitigate current information barriers when caring for CMC. These requirements included the following: (1) supporting the accessibility of care plans from multiple locations (eg, cloud-based) and from multiple devices, with alert and search features; (2) ensuring the organization is tailored to the specific user; (3) including collaborative functionality such as real-time, multiuser content management and secure messaging; and (4) storing care plans on a secure platform with caregiver-controlled permission settings. Although further studies are needed to understand the optimal design and implementation strategies, shared care plans that meet these specified requirements could mitigate perceived information barriers and improve care for CMC. Copyright © 2018 by the American Academy of Pediatrics.
Results of the UCAR 2008 Forum on Climate Mitigation and Adaptation
NASA Astrophysics Data System (ADS)
Fellows, J.; Barron, E.
2008-12-01
Mayors, governors, and local decision makers are developing climate change action plans. They are not waiting for the federal carbon emission reduction debates to conclude (e.g., cap and trade or carbon tax legislation). Many of them are struggling with what should be in these plans, what they should be assuming about future weather and climate trends, and what the impact might be on their community and its infrastructure. In October 2008, the University Corporation for Atmospheric Research held a forum at its 2008 Members' Meeting that focused on the UCAR community's role in climate change adaptation and mitigation. Many of UCAR's 71 university members are involved in projects with local and regional decision makers struggling with planning for the future in the face of climate change. The forum focused on the following questions: 1. How are these projects working and what lessons have we learned? 2. What can our community can do to assist these partnerships (e.g., models and other tools, better information, training opportunities, outreach, sharing ideas, etc.)? 3. Can we help our nation deal more effectively with climate mitigation and adaptation by being more strategic with these partnerships (e.g., more coordination, creating packages of tools and information, creating common approaches to climate action plans, developing better communication tools, community strategic planning effort, etc.)? This presentation will provide a summary of the forum outcomes.
Why Do Drivers Use Mobile Phones While Driving? The Contribution of Compensatory Beliefs
Zhou, Ronggang; Yu, Mengli; Wang, Xinyi
2016-01-01
The current study is the first to investigate the contribution of compensatory beliefs (i.e., the belief that the negative effects of an unsafe behavior can be "neutralized" by engaging in another safe behavior; e.g., "I can use a mobile phone now because I will slow down ") on drivers’ mobile phone use while driving. The effects of drivers’ personal characteristics on compensatory beliefs, mobile phone use and self-regulatory behaviors were also examined. A series of questions were administered to drivers, which included (1) personal measures, (2) scales that measured compensatory beliefs generally in substance use and with regard to driving safety, and (3) questions to measure drivers’ previous primary mobile phone usage and corresponding self-regulatory actions. Overall, drivers reported a low likelihood of compensatory beliefs, prior mobile phone use, and a strong frequency of self-regulatory behaviors. Respondents who had a higher tendency toward compensatory beliefs reported more incidents or crash involvement caused by making or answering calls and sending or reading messages. The findings provide strong support for the contribution of compensatory beliefs in predicting mobile phone usage in the context of driving. Compensatory beliefs can explain 41% and 43% of the variance in the active activities of making calls and texting/sending messages compared with 18% and 31% of the variance in the passive activities of answering calls and reading messages. Among the regression models for predicting self-regulatory behaviors at the tactical or operational level, compensatory beliefs emerge as significant predictors only in predicting shorter conversations while on a call. The findings and limitations of the current study are discussed. PMID:27494524
40 CFR 230.95 - Ecological performance standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...
40 CFR 230.95 - Ecological performance standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...
40 CFR 230.95 - Ecological performance standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...
40 CFR 230.98 - Mitigation banks and in-lieu fee programs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...
40 CFR 230.98 - Mitigation banks and in-lieu fee programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...
40 CFR 230.98 - Mitigation banks and in-lieu fee programs.
Code of Federal Regulations, 2012 CFR
2012-07-01
... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...
40 CFR 230.98 - Mitigation banks and in-lieu fee programs.
Code of Federal Regulations, 2014 CFR
2014-07-01
... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...
40 CFR 230.98 - Mitigation banks and in-lieu fee programs.
Code of Federal Regulations, 2013 CFR
2013-07-01
... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...
Vegetation and other development options for mitigating urban air pollution impacts
Richard Baldauf; David J. Nowak
2014-01-01
While air pollution control devices and programs are the primary method of reducing emissions, urban air pollution can be further mitigated through planning and design strategies, including vegetation preservation and planting, building design and development, installing roadside and near-source structures, and modifying surrounding terrain features.
40 CFR 230.95 - Ecological performance standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...
30 CFR 250.254 - What mitigation measures information must accompany the DPP or DOCD?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What mitigation measures information must accompany the DPP or DOCD? 250.254 Section 250.254 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT... Information Contents of Development and Production Plans (dpp) and Development Operations Coordination...
Since late-1984, EPA's AEERL has supported a program to develop and demonstrate radon mitigation techniques for single-family detached dwellings. As part of the program, projects have been started directed at developing and demonstrating the use of diagnostic measurements in all ...
DOT National Transportation Integrated Search
2011-01-01
This report presents the mitigation strategies and demonstration/pilot projects that are recommended to enhance performance and reduce the occurrence of pavements exhibiting accelerated aging or deterioration. The report is grouped into two parts, fo...
Proceedings: Conference on Compensatory/Remedial Education.
ERIC Educational Resources Information Center
Fea, Henry R., Ed.; And Others
This document presents the papers and discussions from the Conference on Compensatory/Remedial Education. The contents include: "Institutional Programs for the Low Achievers" by Joan G. Roloff; "Communication in Compensatory Education" by Henry R. Fea; "Seminar: Special Programs for Minorities" by Constance Acholonu; "Seminar: Special Programs for…
49 CFR 91.7 - Determination of compensatory charges.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Determination of compensatory charges. 91.7 Section 91.7 Transportation Office of the Secretary of Transportation INTERNATIONAL AIR TRANSPORTATION FAIR COMPETITIVE PRACTICES § 91.7 Determination of compensatory charges. (a) Upon indication by the...
5 CFR 551.531 - Compensatory time off.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Compensatory time off. 551.531 Section 551.531 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PAY ADMINISTRATION UNDER THE FAIR LABOR STANDARDS ACT Overtime Pay Provisions Compensatory Time Off § 551.531...
40 CFR 300.210 - Federal contingency plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...
ERIC Educational Resources Information Center
Hutchins, Holly M.; Annulis, Heather; Gaudet, Cyndi
2008-01-01
Modern organizations constantly face unparalleled changes and uncertainty in the competitive world, thus requiring strategic planning to mitigate crisis conditions. Underscoring crisis plans are performance interventions that prepare employees, technological systems, and the organizational culture to effectively respond to a crisis event. However,…
Risk management and disaster recovery planning for online libraries.
Uzwyshyn, Ray
2015-01-01
This article presents an overview of risk management and disaster recovery planning for online libraries. It is suitable for a broad audience interested in online libraries and research centers in universities and colleges. It outlines risk mitigation strategies, and disaster recover planning for online resource-centered information systems.
DOD Product Support Business Case Analysis Guidebook
2011-04-01
Mitigation Plans ................................................................................................ 30 4.8 Sensitivity Analysis...Product Support BCA concludes with a recommendation and associated specific actions and an implementation plan to achieve stated organizational...primary executer of the actions and recommendations derived out of the BCA. Within the program office, the PSM has the responsibility to plan
Iowa Climate Change Adaptation and Resilience Report
The findings of a pilot project to work with stakeholders and governments in Iowa to identify barriers to and incentives for considering regional effects of climate change in hazard mitigation planning and other community planning processes.
Shah, Ghulam Abbas; Groot, Jeroen C.J.; Shah, Ghulam Mustafa; Lantinga, Egbert A.
2013-01-01
Many measures have been proposed to mitigate gaseous emissions and other nutrient losses from agroecosystems, which can have large detrimental effects for the quality of soils, water and air, and contribute to eutrophication and global warming. Due to complexities in farm management, biological interactions and emission measurements, most experiments focus on analysis of short-term effects of isolated mitigation practices. Here we present a model that allows simulating long-term effects at the whole-farm level of combined measures related to grassland management, animal housing and manure handling after excretion, during storage and after field application. The model describes the dynamics of pools of organic carbon and nitrogen (N), and of inorganic N, as affected by farm management in grassland-based dairy systems. We assessed the long-term effects of delayed grass mowing, housing type (cubicle and sloping floor barns, resulting in production of slurry and solid cattle manure, respectively), manure additives, contrasting manure storage methods and irrigation after application of covered manure. Simulations demonstrated that individually applied practices often result in compensatory loss pathways. For instance, methods to reduce ammonia emissions during storage like roofing or covering of manure led to larger losses through ammonia volatilization, nitrate leaching or denitrification after application, unless extra measures like irrigation were used. A strategy of combined management practices of delayed mowing and fertilization with solid cattle manure that is treated with zeolite, stored under an impermeable sheet and irrigated after application was effective to increase soil carbon stocks, increase feed self-sufficiency and reduce losses by ammonia volatilization and soil N losses. Although long-term datasets (>25 years) of farm nutrient dynamics and loss flows are not available to validate the model, the model is firmly based on knowledge of processes and measured effects of individual practices, and allows the integrated exploration of effective emission mitigation strategies. PMID:23826255
2016-01-01
The Intergovernmental Panel on Climate Change (IPCC) has made it clear that anthropogenic greenhouse gasses are the main cause of observed global warming that leads to climate change. Climate change is now a global reality. In the South African political set-up, local municipalities are the structures that are in direct contact with communities and they draw up Integrated Development Plans (IDPs), which are reviewed and upgraded annually. The article seeks to investigate the extent to which climate change adaptation and mitigation strategies are embedded IDPs in seven vulnerable municipalities in the Limpopo Province. The article conducted an in-depth content analysis of the IDPs of the seven municipalities and the results have revealed that these municipalities have not included adaptation and mitigation strategies adequately in their IDPs despite being the most vulnerable municipalities in the province. The article concludes that these municipalities have not as yet institutionalised climate change in their daily operations, planning and decision making. To this end, the paper recommends that local municipalities should include climate change adaptation and mitigation strategies in their IDPs.
Drainage network optimization for inundation mitigation case study of ITS Surabaya
NASA Astrophysics Data System (ADS)
Savitri, Yang Ratri; Lasminto, Umboro
2017-06-01
Institut Teknologi Sepuluh Nopember (ITS) Surabaya is one of engineering campus in Surabaya with an area of ± 187 ha, which consists of building and campus facilities. The campus is supported by drainage system planned according to the ITS Master Plan on 2002. The drainage system is planned with numbers of retention and detention pond based on the city concept of Zero Delta Q concept. However, in the rainy season, it frequently has inundation problems in several locations. The problems could be identified from two major sources, namely the internal campus facilities and external condition connected with the city drainage system. This paper described the capabilities of drainage network optimization to mitigate local urban drainage problem. The hydrology-hydraulic investigation was done by utilizing the Storm Water Management Model (SWMM) developed by US Environmental Protection Agency (EPA). The mitigation is based on several alternative that based on the existing condition and regarding the social problem. The study results showed that the management of the flow from external source could reduce final stored volume of the campus main channel by 31.75 %.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biebesheimer, E.
This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.
Using offsets to mitigate environmental impacts of major projects: A stakeholder analysis.
Martin, Nigel; Evans, Megan; Rice, John; Lodhia, Sumit; Gibbons, Philip
2016-09-01
Global patterns of development suggest that as more projects are initiated, business will need to find acceptable measures to conserve biodiversity. The application of environmental offsets allows firms to combine their economic interests with the environment and society. This article presents the results of a multi-stakeholder analysis related to the design of offsets principles, policies, and regulatory processes, using a large infrastructure projects context. The results indicate that business was primarily interested in using direct offsets and other compensatory measures, known internationally as indirect offsets, to acquit their environmental management obligations. In contrast, the environmental sector argued that highly principled and scientifically robust offsets programs should be implemented and maintained for enduring environmental protection. Stakeholder consensus stressed the importance of offsets registers with commensurate monitoring and enforcement. Our findings provide instructive insights into the countervailing views of offsets policy stakeholders. Copyright © 2016 Elsevier Ltd. All rights reserved.
USDA-ARS?s Scientific Manuscript database
Growing ruminants maintained under dietary restriction for extended periods will exhibit compensatory growth when reverted to ad libitum feeding. This period of compensatory growth is associated with increased feed efficiency, lower basal energy requirements, and changes in circulating concentration...
Compensatory Education Services.
ERIC Educational Resources Information Center
National Inst. of Education (DHEW), Washington, DC.
This is the first of six reports on compensatory education services. The purpose of this report is to describe the compensatory education services provided by a cross section of the 14,000 school districts that receive Elementary Secondary Education Act Title I funds. It provides a factual background for the other reports in this series. This…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-11
... Nuclear Power Plant Fire Protection (CARMEN-FIRE) AGENCY: Nuclear Regulatory Commission. ACTION: Draft..., ``Compensatory and Alternative Regulatory Measures for Nuclear Power Plant Fire Protection (CARMEN-FIRE).'' In... integral part of NRC-approved fire protection programs. However, compensatory measures are not expected to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cox, Sarah L; Hotchkiss, Elizabeth L; Bilello, Daniel E
Reliable, safe, and secure electricity is essential for economic and social development and a necessary input for many sectors of the economy. However, electricity generation and associated processes make up a significant portion of global greenhouse gas (GHG) emissions contributing to climate change. Furthermore, electricity systems are vulnerable to climate change impacts - both short-term events and changes over the longer term. This vulnerability presents both near-term and chronic challenges in providing reliable, affordable, equitable, and sustainable energy services. Within this context, developing countries face a number of challenges in the energy sector, including the need to reliably meet growingmore » electricity demand, lessen dependence on imported fuels, expand energy access, and improve stressed infrastructure for fuel supply and electricity transmission. Energy efficiency (EE) and renewable energy (RE) technical solutions described in this paper can bridge action across climate change mitigation and resilience through reducing GHG emissions and supporting electric power sector adaptation to increasing climate risk. Integrated planning approaches, also highlighted in this paper, play an integral role in bringing together mitigation and resilience action under broader frameworks. Through supporting EE and RE deployment and integrated planning approaches, unique to specific national and local circumstances, countries can design and implement policies, strategies, and sectoral plans that unite development priorities, climate change mitigation, and resilience.« less
Susitna Hydroelectric Project: terrestrial environmental workshop and preliminary simulation model
Everitt, Robert R.; Sonntag, Nicholas C.; Auble, Gregory T.; Roelle, James E.; Gazey, William
1982-01-01
The technical feasibility, economic viability, and environmental impacts of a hydroelectric development project in the Susitna River Basin are being studied by Acres American, Inc. on behalf of the Alaska Power Authority. As part of these studies, Acres American recently contracted LGL Alaska Research Associates, Inc. to coordinate the terrestrial environmental studies being performed by the Alaska Department of Fish and Game and, as subcontractors to LGL, several University of Alaska research groups. LGL is responsible for further quantifying the potential impacts of the project on terrestrial wildlife and vegetation, and for developing a plan to mitigate adverse impacts on the terrestrial environment. The impact assessment and mitigation plan will be included as part of a license application to the Federal Energy Regulatory Commission (FERC) scheduled for the first quarter of 1983. The quantification of impacts, mitigation planning, and design of future research is being organized using a computer simulation modelling approach. Through a series of workshops attended by researchers, resource managers, and policy-makers, a computer model is being developed and refined for use in the quantification of impacts on terrestrial wildlife and vegetation, and for evaluating different mitigation measures such as habitat enhancement and the designation of replacement lands to be managed by wildlife habitat. This report describes the preliminary model developed at the first workshop held August 23 -27, 1982 in Anchorage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oggerino, J.; Rabinowitz, M.
1998-06-01
Natural and person-caused disasters are increasing in frequency and magnitude, and these disasters are taking an ever increasing economic and personal toll. This report identifies technologies that can help utilities, their customers, and their communities cope with disasters. Each year, 10,000 violent thunderstorms, 5,000 floods, and 1,000 tornadoes strike the US. These and other natural events have cost at least $8 billion per year over the last 30 years, and the annual costs are increasing rapidly. In 1996, the US experienced twice the yearly average of declared disasters than in the previous twenty years. Damage from Hurricane Andrew and themore » Northridge earthquake resulted in losses of $30 and $25 billion respectively. As a result of these and other costly disasters, utilities are losing business and commercial customers. In response, federal, state, and local organizations have steeped up efforts to deploy mitigation technologies and techniques and business recovery support. A task within the EPRI Disaster Planning and Mitigation Technologies (DP and MT) Target seeks to identify technologies that can help utilities and their customers prepare for and recover from natural disasters. This report provides concise and directed product information that can help member utilities and the communities they serve to plan for, mitigate, and recover quickly from natural and person-caused disasters. This will enable them to retain customers and reduce revenue losses.« less
National Contingency Plan (NCP) Subpart J Product Schedule Fact Sheet
This section of the National Oil and Hazardous Substances Pollution Contingency Plan stipulates the criteria for listing and managing the use of dispersants and other chemical and biological agents used to mitigate oil spills.
National Contingency Plan Subpart J
Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.
GHG emission mitigation measures and technologies in the Czech Republic
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tichy, M.
1996-12-31
The paper presents a short overview of main results in two fields: projection of GHG emission from energy sector in the Czech Republic and assessment of technologies and options for GHG mitigation. The last part presents an overview of measures that were prepared for potential inclusion to the Czech Climate Change Action Plan.
78 FR 13844 - Change in Submission Requirements for State Mitigation Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-01
... protecting human lives and the environment. No action that FEMA can anticipate under this rule will have a... to reduce damage to lives, property, and the economy from future disasters. State, Tribal, and local... funding for eligible mitigation activities that reduce disaster losses and protect life and property from...
Carbon stocks of mangroves within the Zambezi River Delta, Mozambique
Christina E. Stringer; Carl C. Trettin; Stanley J. Zarnoch; Wenwu Tang
2015-01-01
Mangroves are well-known for their numerous ecosystem services, including storing a globally significant C pool. There is increasing interest in the inclusion of mangroves in national climate change mitigation and adaptation plans in developing nations as they become involved with incentive programs for climate change mitigation. The quality and precision of data...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Casey, Daniel; Malta, Patrick
1990-06-01
Project goals are to rehabilitate 1120 acres of big game (elk and mule deer, Odocoileus hemionus) winter range on the Hungry Horse and Spotted Bear Districts of Flathead National Forest lands adjacent to Hungry Horse Reservoir. This project represents the initial phase of implementation toward the mitigation goal. A minimum of 547 acres Trust-funded enhancements are called for in this plan. The remainder are part of the typical Forest Service management activities for the project area. Monitor and evaluate the effects of project implementation on the big game forage base and elk and mule deer populations in the project area.more » Monitor enhancement success to determine effective acreage to be credited against mitigation goal. Additional enhancement acreage will be selected elsewhere in the Flathead Forest or other lands adjacent'' to the reservoir based on progress toward the mitigation goal as determined through monitoring. The Wildlife Mitigation Trust Fund Advisory Committee will serve to guide decisions regarding future enhancement efforts. 7 refs.« less
An effective public health program to reduce urban heat islands in Québec, Canada.
Beaudoin, Mélanie; Gosselin, Pierre
2016-09-01
In 2005, the Government of the Province of Québec, Canada, adopted the Climate Change Action Plan for 2006 - 2012. The Institut national de santé publique du Québec (National Institute of Public Health of Québec), charged with implementing the health adaptation component of the Plan, worked to mitigate urban heat islands (UHI) by funding and evaluating 40 pilot projects. These projects explored different methods of fighting UHIs by greening cities in a participative and mobilizing approach led mainly by non-governmental organizations and municipalities. An assessment of temperatures before and after implementing various methods demonstrated that some actions enabled significant gains of coolness and more efficiently mitigated heat (reduction of concrete/asphalt surfaces, increasing vegetation, etc.). An assessment of quality of life showed that projects were positively received by users, especially by those living in vulnerable situations. A lifecycle analysis showed that from the environmental perspective, UHI mitigation measures that do not require fertilization or maintenance are preferable. Finally, communication efforts that raise awareness of UHI and mitigation are of significant importance to program success.
Lifelong Aerobic Exercise Reduces the Stress Response in Rats.
Pietrelli, A; Di Nardo, M; Masucci, A; Brusco, A; Basso, N; Matkovic, L
2018-04-15
The aim of this study was to analyze the effects of lifelong aerobic exercise (AE) on the adaptive response of the stress system in rats. It is well known that hypothalamic-pituitary-adrenal axis (HPA) activity differs when triggered by voluntary or forced exercise models. Male Wistar rats belonging to exercise (E) or control (C) groups were subjected to chronic AE, and two cutoff points were established at 8 (middle age) and 18 months (old age). Behavioral, biochemical and histopathological studies were performed on the main components/targets of the stress system. AE increased adrenal sensitivity (AS), brain corticosterone (CORT) and corticotropin-releasing factor (CRF), but had no effect on the thymus, adrenal glands (AGs) weight or plasma CORT. In addition, AE exerted no effect on the sympathetic tone, but significantly reduced anxiety-related behavior and emotionality. Aging decreased AS and deregulated neuroendocrine feedback, leading to an anxiogenic state which was mitigated by AE. Histopathological and morphometric analysis of AGs showed no alterations in middle-aged rats but adrenal vacuolization in approximately 20% old rats. In conclusion, lifelong AE did not produce adverse effects related to a chronic stress state. On the contrary, while AE upregulated some components of the HPA axis, it generated an adaptive response to cumulative changes, possibly through different compensatory and/or super compensatory mechanisms, modulated by age. The long-term practice of AE had a strong positive impact on stress resilience so that it could be recommended as a complementary therapy in stress and depression disease. Copyright © 2018 IBRO. Published by Elsevier Ltd. All rights reserved.
Moreira, Xoaquín; Abdala-Roberts, Luis; Hernández-Cumplido, Johnattan; Cuny, Maximilien A C; Glauser, Gaetan; Benrey, Betty
2015-08-01
• Following herbivore attack, plants can either reduce damage by inducing defenses or mitigate herbivory effects through compensatory growth and reproduction. It is increasingly recognized that such induced defenses in plants are herbivore-specific, but less is known about the specificity of compensatory responses. Damage by multiple herbivores may also lead to synergistic effects on induction and plant fitness that differ from those caused by a single herbivore species. Although largely unstudied, the order of arrival and damage by different herbivore species might also play an important role in the impacts of herbivory on plants.• We investigated the specificity of defense induction (phenolics) and effects on growth (number of stems and leaves) and reproduction (number of seeds, seed mass, and germination rate) from feeding by two generalist leaf-chewing herbivores (Spodoptera eridania and Diabrotica balteata) on Phaseolus lunatus plants and evaluated whether simultaneous attack by both herbivores and their order of arrival influenced such dynamics.• Herbivory increased levels of leaf phenolics, but such effects were not herbivore-specific. In contrast, herbivory enhanced seed germination in an herbivore-specific manner. For all variables measured, the combined effects of both herbivore species did not differ from their individual effects. Finally, the order of herbivore arrival did not influence defense induction, plant growth, or seed number but did influence seed mass and germination.• Overall, this study highlights novel aspects of the specificity of plant responses induced by damage from multiple species of herbivores and uniquely associates such effects with plant lifetime fitness. © 2015 Botanical Society of America, Inc.
Reckien, Diana; Flacke, Johannes; Olazabal, Marta; Heidrich, Oliver
2015-01-01
Cities are recognised as key players in global adaptation and mitigation efforts because the majority of people live in cities. However, in Europe, which is highly urbanized and one of the most advanced regions in terms of environmental policies, there is considerable diversity in the regional distribution, ambition and scope of climate change responses. This paper explores potential factors contributing to such diversity in 200 large and medium-sized cities across 11 European countries. We statistically investigate institutional, socio-economic, environmental and vulnerability characteristics of cities as potential drivers of or barriers to the development of urban climate change plans. Our results show that factors such as membership of climate networks, population size, GDP per capita and adaptive capacity act as drivers of mitigation and adaptation plans. By contrast, factors such as the unemployment rate, warmer summers, proximity to the coast and projected exposure to future climate impacts act as barriers. We see that, overall, it is predominantly large and prosperous cities that engage in climate planning, while vulnerable cities and those at risk of severe climate impacts in the future are less active. Our analysis suggests that climate change planning in European cities is not proactive, i.e. not significantly influenced by anticipated future impacts. Instead, we found that the current adaptive capacity of a city significantly relates to climate planning. Along with the need to further explore these relations, we see a need for more economic and institutional support for smaller and less resourceful cities and those at high risk from climate change impacts in the future.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Plesko, Catherine S; Clement, R Ryan; Weaver, Robert P
2009-01-01
The mitigation of impact hazards resulting from Earth-approaching asteroids and comets has received much attention in the popular press. However, many questions remain about the near-term and long-term, feasibility and appropriate application of all proposed methods. Recent and ongoing ground- and space-based observations of small solar-system body composition and dynamics have revolutionized our understanding of these bodies (e.g., Ryan (2000), Fujiwara et al. (2006), and Jedicke et al. (2006)). Ongoing increases in computing power and algorithm sophistication make it possible to calculate the response of these inhomogeneous objects to proposed mitigation techniques. Here we present the first phase of amore » comprehensive hazard mitigation planning effort undertaken by Southwest Research Institute and Los Alamos National Laboratory. We begin by reviewing the parameter space of the object's physical and chemical composition and trajectory. We then use the radiation hydrocode RAGE (Gittings et al. 2008), Monte Carlo N-Particle (MCNP) radiation transport (see Clement et al., this conference), and N-body dynamics codes to explore the effects these variations in object properties have on the coupling of energy into the object from a variety of mitigation techniques, including deflection and disruption by nuclear and conventional munitions, and a kinetic impactor.« less
ERIC Educational Resources Information Center
Bernardi, Fabrizio
2014-01-01
Compensatory advantage is a mechanism of social stratification that complements cumulative advantage and path dependence. In this article, I first discuss the theoretical foundations of the compensatory advantage and path dependence mechanisms and the methodological challenges that complicate identification of their effects. Next, I present a…
30 CFR 256.72 - Compensatory payments as production.
Code of Federal Regulations, 2014 CFR
2014-07-01
... INTERIOR OFFSHORE LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF Assignments, Transfers, and Extensions § 256.72 Compensatory payments as production. If an oil and gas lessee makes compensatory payments and if the lease is not being maintained in force by other production of oil or gas in...
Code of Federal Regulations, 2011 CFR
2011-07-01
... required under section 7. Compensatory time received by an employee in lieu of cash must be at the rate of not less than one and one-half hours of compensatory time for each hour of overtime work, just as the... Time and Compensatory Time Off § 553.20 Introduction. Section 7 of the FLSA requires that covered...
Predictive procedure for compensatory hyperhidrosis before sympathectomy: preliminary findings.
Jeong, Jin Yong; Park, Hyung Joo; Park, Jae Kil; Jo, Keon Hyeon; Wang, Young Pil; Lee, Jongho; Shin, Jae Seong
2014-08-01
Compensatory hyperhidrosis is one of the most common and serious adverse effects following sympathectomy. We performed a local anesthetic procedure that predicts the occurrence and severity of compensatory hyperhidrosis, and evaluated the feasibility, safety, and efficacy of the procedure. From July 2009 to July 2010, 20 patients with severe primary palmar hyperhidrosis underwent predictive procedures. A sympathetic nerve block was obtained via thoracoscopic approach under local anesthesia. The patients were evaluated for compensatory hyperhidrosis 1 week after the procedure before deciding whether to proceed with sympathectomy. Of the 20 patients, 17 patients proceeded with sympathectomy and 3 refused the final procedure. Following sympathectomy, the occurrence and severity of compensatory hyperhidrosis in the remaining 17 patients were statistically analyzed with two tailed paired t test, and there is no significant difference between the predictive and final procedures (t = 1.69, df = 16, p > 0.1). Predictive procedure using local anesthesia to detect compensatory hyperhidrosis before sympathectomy may be useful for helping patients to decide whether to undergo the operation. Georg Thieme Verlag KG Stuttgart · New York.
GLIMPSE – A computational framework for supporting state-level environmental and energy planning
GLIMPSE is an EPA modeling tool for environmental and energy planning used to find U.S. policy scenarios that simultaneously improve air quality, human health, reduce impacts to ecosystems, and mitigate climate change.
Climate mitigation is not the only benefit of a national energy system
NASA Astrophysics Data System (ADS)
Clack, C.
2016-12-01
Many speculate that the main driving force for a continental scale energy system is for climate mitigation. While this is a strong driver, there are multiple co-benefits that emerge from such a transition when purely driven by costs. These components could be managed within a planned system to provide a close-to-optimal solution that enhances the probability of realization. It is shown that these co-benefits of a continental scale electric system occur at costs lower than existing ones. That means there are multiple additional savings without extra costs or effort. The disadvantage is coordination between large geographic regions that could cause more complexity in planning. The main finding from different versions of the NEWS simulator is that carbon mitigation is enhanced by larger systems. In addition, there are increased jobs, reduced water consumption, Sulphur dioxide emissions, Nitrogen oxide emissions, a more distributed electric system and a lower cost of electricity.
Bolotov, I N; Kolosova, Iu S; Podbolotskaia, M V; Potapov, G S; Grishchenko, I V
2013-01-01
The notion of a dynamic compensatory system is discussed, characterized by the alternation of species occupying the leading position in bumblebee taxocenoses, while the total density of these pollinators in island ecosystems remains at similar levels. The functioning of the compensatory system is regulated by both abiotic factors (the weather and climate) and biotic factors (competition for trophic resources). The stability of the system is determined by the presence of reserve compensatory species capable of rapid population growth against the background of depressed abundance of other species under changing environmental conditions.
Edward B. Butler
2005-01-01
The fires of 2000 and 2002 catalyzed a national mandate for fuel treatment programs to facilitate wildfire mitigation, yet the issues that need to be considered when planning large landscape projects are daunting, often ending in gridlock due to planning conflicts. Hazardous fuels maps help little when planning for integrated, system-wide ecological objectives and fail...
Effects of urban form on the urban heat island effect based on spatial regression model.
Yin, Chaohui; Yuan, Man; Lu, Youpeng; Huang, Yaping; Liu, Yanfang
2018-09-01
The urban heat island (UHI) effect is becoming more of a concern with the accelerated process of urbanization. However, few studies have examined the effect of urban form on land surface temperature (LST) especially from an urban planning perspective. This paper used spatial regression model to investigate the effects of both land use composition and urban form on LST in Wuhan City, China, based on the regulatory planning management unit. Landsat ETM+ image data was used to estimate LST. Land use composition was calculated by impervious surface area proportion, vegetated area proportion, and water proportion, while urban form indicators included sky view factor (SVF), building density, and floor area ratio (FAR). We first tested for spatial autocorrelation of urban LST, which confirmed that a traditional regression method would be invalid. A spatial error model (SEM) was chosen because its parameters were better than a spatial lag model (SLM). The results showed that urban form metrics should be the focus for mitigation efforts of UHI effects. In addition, analysis of the relationship between urban form and UHI effect based on the regulatory planning management unit was helpful for promoting corresponding UHI effect mitigation rules in practice. Finally, the spatial regression model was recommended to be an appropriate method for dealing with problems related to the urban thermal environment. Results suggested that the impact of urbanization on the UHI effect can be mitigated not only by balancing various land use types, but also by optimizing urban form, which is even more effective. This research expands the scientific understanding of effects of urban form on UHI by explicitly analyzing indicators closely related to urban detailed planning at the level of regulatory planning management unit. In addition, it may provide important insights and effective regulation measures for urban planners to mitigate future UHI effects. Copyright © 2018 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gray, J; Lukose, R; Bronson, J
2015-06-15
Purpose: To conduct a failure mode and effects analysis (FMEA) as per AAPM Task Group 100 on clinical processes associated with teletherapy, and the development of mitigations for processes with identified high risk. Methods: A FMEA was conducted on clinical processes relating to teletherapy treatment plan development and delivery. Nine major processes were identified for analysis. These steps included CT simulation, data transfer, image registration and segmentation, treatment planning, plan approval and preparation, and initial and subsequent treatments. Process tree mapping was utilized to identify the steps contained within each process. Failure modes (FM) were identified and evaluated with amore » scale of 1–10 based upon three metrics: the severity of the effect, the probability of occurrence, and the detectability of the cause. The analyzed metrics were scored as follows: severity – no harm = 1, lethal = 10; probability – not likely = 1, certainty = 10; detectability – always detected = 1, undetectable = 10. The three metrics were combined multiplicatively to determine the risk priority number (RPN) which defined the overall score for each FM and the order in which process modifications should be deployed. Results: Eighty-nine procedural steps were identified with 186 FM accompanied by 193 failure effects with 213 potential causes. Eighty-one of the FM were scored with a RPN > 10, and mitigations were developed for FM with RPN values exceeding ten. The initial treatment had the most FM (16) requiring mitigation development followed closely by treatment planning, segmentation, and plan preparation with fourteen each. The maximum RPN was 400 and involved target delineation. Conclusion: The FMEA process proved extremely useful in identifying previously unforeseen risks. New methods were developed and implemented for risk mitigation and error prevention. Similar to findings reported for adult patients, the process leading to the initial treatment has an associated high risk.« less
Shi, Z.; Tian, G.; Dong, S.; Xia, J.; He, H.; ,
2004-01-01
In a desert area, it is difficult to couple geophones with dry sands. A low and depression velocity layer can seriously attenuate high frequency components of seismic data. Therefore, resolution and signal-to-noise (S/N) ratio of seismic data deteriorate. To enhance resolution and S/N ratio of seismic data, we designed a coupling compensatory inverse filter by using the single trace seismic data from Seismic Wave Detect System (SWDS) and common receivers on equal conditions. We designed an attenuating compensatory inverse filter by using seismic data from a microseismogram log. At last, in order to convert a shot gather from common receivers to a shot gather from SWDS, we applied the coupling compensatory inverse filter to the shot gather from common receivers. And then we applied the attenuating compensatory inverse filter to the coupling stacked seismic data to increase its resolution and S/N ratio. The results show that the resolution of seismic data from common receivers after processing by using the coupling compensatory inverse filter is nearly comparable with that of data from SWDS. It is also found that the resolution and S/N ratio have been enhanced after the use of attenuating compensatory inverse filter. From the results, we can conclude that the filters can compensate high frequencies of seismic data. Moreover, the low frequency changed nearly.
State Compensatory Education in New Jersey: The Allocation Formula. Series I.
ERIC Educational Resources Information Center
Thomas, Earl Preston
While it is understood that state compensatory education funds will probably do little to close the gap in public school expenditure levels between wealthy and poor New Jersey districts, it is still important that the educational consumer and the interested observer understand how the system works. Compensatory education funds are the source of…
Compensatory Education Product Evaluation: Elementary and Secondary Programs 1991-1992.
ERIC Educational Resources Information Center
Saginaw Public Schools, MI. Dept. of Evaluation Services.
An evaluation was done of compensatory educational programs in reading and mathematics in the Saginaw (Michigan) School District. The elementary Compensatory Education (CE) program is both a push-in format (grades 1 and 2) and a pull-out format (periodically taking students out of regular classrooms) that serves 2,045 students in grades 1 through…
Impact of Compensatory Intervention in 6- to 18-Month-Old Babies at Risk of Motor Development Delays
ERIC Educational Resources Information Center
Müller, Alessandra Bombarda; Saccani, Raquel; Valentini, Nadia Cristina
2017-01-01
Purpose: Research indicates that delayed motor development observed in the first years of life can be prevented through compensatory intervention programmes that provide proper care during this critical period of child development. Method: This study analysed the impact of a 12-week compensatory motor intervention programme on 32 babies with…
ERIC Educational Resources Information Center
Wooten, Melissa E.
2016-01-01
This study investigates how the college readiness of participants in a compensatory program designed to facilitate interest in science and engineering was determined. Archival data were used to qualitatively analyze the performance reports of 205 student participants during the compensatory program's first 5 years. Findings indicate participants…
Compensatory Programs in Mexico to Reduce the Educational Gap
ERIC Educational Resources Information Center
Canales Rodriguez, Emma Laticia; Moreno Olivos, Tiburcio
2012-01-01
In this paper we approach the issue of compensatory education programs to reduce the backlog in basic education. We address the population living in rural areas, because the Compensatory Programs (CPs) are aimed at them. The presentation is divided into three parts. The first section presents an approach to basic education in Mexico, the second…
Groundwater Interim Measures Work Plan for the Former Chemical Plant
May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.
Rodriguez, Fred H; Petersen, John; Selvaratnam, Rajeevan; Mann, Peggy; Hoyne, Jonathan B
2018-03-21
Severe weather events such as hurricanes have the potential to cause significant disruption of laboratory operations. Comprehensive planning is essential to mitigate the impact of such events. The essential elements of a Hurricane Plan, based on our personal experiences, are detailed in this article.
The relationship between executive function and fine motor control in young and older adults.
Corti, Emily J; Johnson, Andrew R; Riddle, Hayley; Gasson, Natalie; Kane, Robert; Loftus, Andrea M
2017-01-01
The present study examined the relationship between executive function (EF) and fine motor control in young and older healthy adults. Participants completed 3 measures of executive function; a spatial working memory (SWM) task, the Stockings of Cambridge task (planning), and the Intra-Dimensional Extra-Dimensional Set-Shift task (set-shifting). Fine motor control was assessed using 3 subtests of the Purdue Pegboard (unimanual, bimanual, sequencing). For the younger adults, there were no significant correlations between measures of EF and fine motor control. For the older adults, all EFs significantly correlated with all measures of fine motor control. Three separate regressions examined whether planning, SWM and set-shifting independently predicted unimanual, bimanual, and sequencing scores for the older adults. Planning was the primary predictor of performance on all three Purdue subtests. A multiple-groups mediation model examined whether planning predicted fine motor control scores independent of participants' age, suggesting that preservation of planning ability may support fine motor control in older adults. Planning remained a significant predictor of unimanual performance in the older age group, but not bimanual or sequencing performance. The findings are discussed in terms of compensation theory, whereby planning is a key compensatory resource for fine motor control in older adults. Copyright © 2016 Elsevier B.V. All rights reserved.
Wildfire Mitigation and Private Lands: Managing Long-Term Vulnerabilities
Brian Muller; Stacey Schulte
2006-01-01
Long-term management of wildfire vulnerability requires strategies that address complex interactions between fire ecology and human settlement. In this paper, we examine the integration of wildfire mitigation and land use planning in county governments in the western U.S. This research relies on data from two sources. First, we conducted a survey of land use...
Geoffrey Koch; Alan Ager; Jeff Kline; Paige Fischer
2016-01-01
Effectively addressing wildfire risk to communities on large multi-owner landscapes requires an understanding of the biophysical factors that influence risk, such as fuel loads, topography, and weather, and social factors such as the capacity and willingness for communities to engage in fire-mitigation activities. Biophysical and social processes often are disconnected...
Kaminski, Michael D; Lee, Sang Don; Magnuson, Matthew
2016-03-15
Nuclear or radiological terrorism in the form of uncontrolled radioactive contamination presents a unique challenge in the field of nuclear decontamination. Potential targets require an immediate decontamination response, or mitigation plan to limit the social and economic impact. To date, experience with urban decontamination of building materials - specifically hard, porous, external surfaces - is limited to nuclear weapon fallout and nuclear reactor accidents. Methods are lacking for performing wide-area decontamination in an urban environment so that in all release scenarios the area may be re-occupied without evaluation and/or restriction. Also lacking is experience in developing mitigation strategies, that is, methods of mitigating contamination and its resultant radiation dose in key areas during the immediate aftermath of an event and after lifesaving operations. To date, the tremendous strategy development effort primarily by the European community has focused on the recovery phase, which extends years beyond the release event. In this review, we summarize the methods and data collected over the past 70 years in the field of hard, external surface decontamination of radionuclide contaminations, with emphasis on methods suitable for response to radiological dispersal devices and their potentially unique physico-chemical characteristics. This review concludes that although a tremendous amount of work has been completed primarily by the European Community (EU) and the United Kingdom (UK), the few studies existing on each technique permit only very preliminary estimates of decontamination factors for various building materials and methods and extrapolation of those values for use in environments outside the EU and UK. This data shortage prevents us from developing an effective and detailed mitigation response plan and remediation effort. Perhaps most importantly, while the data available does include valuable information on the practical aspects of performing the various remediation methods including costs, coverage rates, manpower, pitfalls, etc., it lacks the details on lessons learned, best practices, and standard procedures, for instance, that would be required to develop a mitigation strategy. While the urban decontamination problem is difficult and there is much more research to do, the existing literature provides a framework for a response plan. Using this framework, in conjunction with computer modeling and relevant data collection, can lead to development of appropriate plans and exercises that would permit development of a mitigation and remediation response. Copyright © 2015 Elsevier B.V. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
...] Francis Proposed Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, Los Osos, San Luis... conservation program to minimize and mitigate project activities as described in their low-effect habitat conservation plan. We invite comments from the public on the application, which includes the Francis Low-Effect...
ERIC Educational Resources Information Center
National Oceanic and Atmospheric Administration (DOC), Rockville, MD.
This plan to mitigate the impact of potential geophysical natural disasters, including those caused by hurricanes, tornadoes, floods and earthquakes, integrates and coordinates the multiagency functions in warning services and community preparedness related to many of these disasters. The plan is divided into five sections. The first two sections…
Hagley, Gregory W; Mills, Peter D; Shiner, Brian; Hemphill, Robin R
2018-04-01
Root cause analyses (RCA) are often completed in health care settings to determine causes of adverse events (AEs). RCAs result in action plans designed to mitigate future patient harm. National reviews of RCA reports have assessed the safety of numerous health care settings and suggested opportunities for improvement. However, few studies have assessed the safety of receiving care from physical therapists, occupational therapists, or speech and language pathology pathologists. The objective of this study was to determine the types of AEs, root causes, and action plans for risk mitigation that exist within the disciplines of rehabilitation medicine. This study is a retrospective, cross-sectional review. A national search of the Veterans Health Administration RCA database was conducted to identify reports describing AEs associated with physical therapy, occupational therapy, or speech and language pathology services between 2009 and May 2016. Twenty-five reports met the inclusion requirements. The reports were classified by the event type, root cause, action plans, and strength of action plans. Delays in care (32.0%) and falls (28.0%) were the most common type of AE. Three AEs resulted in death. RCA teams identified deficits regarding policy and procedures as the most common root cause. Eighty-eight percent of RCA reports included strong or intermediate action plans to mitigate risk. Strong action plans included standardizing emergency terminology and implementing a dedicated line to call for an emergency response. These data are self-reported and only AEs that are scored as a safety assessment code 3 in the system receive a full RCA, so there are likely AEs that were not captured in this study. In addition, the RCA reports are deidentified and so do not include all patient characteristics. As the Veterans Health Administration system services mostly men, the data might not generalize to non-Veterans Health Administration systems with a different patient mix. Care provided by rehabilitation professionals is generally safe, but AEs do occur. Based on this RCA review, the safety of rehabilitation services can be improved by implementing strong practices to mitigate risk to patients. Checklists should be considered to aid timely decision making when initiating an emergency response.
Sitek, Kevin R; Cai, Shanqing; Beal, Deryk S; Perkell, Joseph S; Guenther, Frank H; Ghosh, Satrajit S
2016-01-01
Persistent developmental stuttering is characterized by speech production disfluency and affects 1% of adults. The degree of impairment varies widely across individuals and the neural mechanisms underlying the disorder and this variability remain poorly understood. Here we elucidate compensatory mechanisms related to this variability in impairment using whole-brain functional and white matter connectivity analyses in persistent developmental stuttering. We found that people who stutter had stronger functional connectivity between cerebellum and thalamus than people with fluent speech, while stutterers with the least severe symptoms had greater functional connectivity between left cerebellum and left orbitofrontal cortex (OFC). Additionally, people who stutter had decreased functional and white matter connectivity among the perisylvian auditory, motor, and speech planning regions compared to typical speakers, but greater functional connectivity between the right basal ganglia and bilateral temporal auditory regions. Structurally, disfluency ratings were negatively correlated with white matter connections to left perisylvian regions and to the brain stem. Overall, we found increased connectivity among subcortical and reward network structures in people who stutter compared to controls. These connections were negatively correlated with stuttering severity, suggesting the involvement of cerebellum and OFC may underlie successful compensatory mechanisms by more fluent stutterers.
Risk and the neoliberal state: why post-Mitch lessons didn't reduce El Salvador's earthquake losses.
Wisner, B
2001-09-01
Although El Salvador suffered light losses from Hurricane Mitch in 1998, it benefited from the increased international aid and encouragement for advance planning, especially mitigation and prevention interventions. Thus, one would have supposed, El Salvador would have been in a very advantageous position, able more easily than its economically crippled neighbours, Honduras and Nicaragua, to implement the 'lessons of Mitch'. A review of the recovery plan tabled by the El Salvador government following the earthquakes of early 2001 shows that despite the rhetoric in favour of 'learning the lessons of Mitch', very little mitigation and prevention had actually been put in place between the hurricane (1998) and the earthquakes (2001). The recovery plan is analysed in terms of the degree to which it deals with root causes of disaster vulnerability, namely, the economic and political marginality of much of the population and environmental degradation. An explanation for the failure to implement mitigation and preventive actions is traced to the adherence by the government of El Salvador to an extreme form of neoliberal, free market ideology, and the deep fissures and mistrust in a country that follow a long and bloody civil war.
Managing Research in a Risk World
NASA Technical Reports Server (NTRS)
Anton, W.; Havenhill, M.
2014-01-01
The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.
Successes and Challenges in Implementation of Radon Control Activities in Iowa, 2010-2015.
Bain, Allison A; Abbott, Anne L; Miller, Laura L
2016-04-14
Radon gas has recently become more prominent in discussions of lung cancer prevention nationally and in Iowa. A review in 2013 of cancer plans in the National Comprehensive Cancer Control Program found that 42% of cancer plans, including Iowa's, had terminology on radon. Plans included awareness activities, home testing, remediation, policy, and policy evaluation. Iowa has the highest average radon concentrations in the United States; 70% of homes have radon concentrations above the Environmental Protection Agency's action levels. Radon control activities in Iowa are led by the Iowa Cancer Consortium, the Iowa Department of Public Health, and the Iowa Radon Coalition. A collaborative approach was used to increase levels of awareness, testing, and (if necessary) mitigation, and to introduce a comprehensive radon control policy in Iowa by engaging partners and stakeholders across the state. The multipronged approach and collaborative work in Iowa appears to have been successful in increasing awareness: the number of radon tests completed in Iowa increased by 20% from 19,600 in 2009 to 23,500 in 2014, and the number of mitigations completed by certified mitigators increased by 108% from 2,600 to more than 5,400. Through collaboration, Iowa communities are engaged in activities that led to increases in awareness, testing, mitigation, and policy. States interested in establishing a similar program should consider a multipronged approach involving multiple entities and stakeholders with different interests and abilities. Improvements in data collection and analysis are necessary to assess impact.
Mitigation planning for raptors during mining
DOE Office of Scientific and Technical Information (OSTI.GOV)
Platt, S.W.; Hargis, N.E.
1990-12-31
Birds of prey and their eggs, young and nests are protected by state and federal laws and regulations. Surface mining operators may experience conflicts with raptors when expanding into nesting areas or when raptors are attracted into mining areas. State and federal permits are required for disturbance or manipulation of birds of prey. Mitigation planning for raptors begins before mining and continues through mining. As conflict situations changes, so must the mitigation plan. Before each nesting season the mining schedule should be compared to areas of known raptor nesting activity. If overlap occurs, nest protection measures may be needed. Areasmore » of potential conflict should be patrolled regularly to identify the presence of a raptor pair and nest starts. Should a raptor nest be built and eggs laid, a change in the mining schedule or an egg or brood manipulation may resolve the conflict. Bridger Coal Company has successfully mitigated conflicts with 3 raptor species. A ferruginous hawk (Buteo regalis) nest with brood was successfully relocated across a pit. Red-tailed hawk (B. jamaicensis) egg clutches were removed from 2 highwall nests and transported in a portable incubator to a commercial raptor propagator where they were hatched, fed and conspecifically imprinted until achieving self-thermoregulation. All chicks were returned to the mine and successfully placed into foster nests. A metal artificial nest ledge for a prairie falcon (Falco mexicanus) was constructed in a cliff and a traditional nesting ledge rendered inaccessible. The falcon pair successfully nested in the artificial ledge.« less
ERIC Educational Resources Information Center
Spencer, John
2012-01-01
This article is a case study of compensatory education as it was developed and implemented by an innovative urban school principal in the early 1960s. I argue that while the compensatory education movement was often marred by pejorative-sounding language and inegalitarian ideas, especially as it was shaped and expanded by policy makers and…
ERIC Educational Resources Information Center
Moller, Asa
2012-01-01
Compensatory pedagogy is in theory a strategy used to manage social and cultural diversity (Sleeter, 2007) by providing extra resources or special treatment for so-called deprived groups. A problem with this particular kind of approach to social and cultural diversity is that it lacks critical awareness of the way social differences (i.e. race,…
Brown, Bryan L; Downing, Amy L; Leibold, Mathew A
2016-08-01
Compensatory dynamics are an important suite of mechanisms that can stabilize community and ecosystem attributes in systems subject to environmental fluctuations. However, few experimental investigations of compensatory dynamics have addressed these mechanisms in systems of real-world complexity, and existing evidence relies heavily on correlative analyses, retrospective examination, and experiments in simple systems. We investigated the potential for compensatory dynamics to stabilize plankton communities in plankton mesocosm systems of real-world complexity. We employed four types of perturbations including two types of nutrient pulses, shading, and acidification. To quantify how communities responded to these perturbations, we used a measure of community-wide synchrony combined with spectral analysis that allowed us to assess timescale-specific community dynamics, for example, whether dynamics were synchronous at some timescales but compensatory at others. The 150-d experiment produced 32-point time series of all zooplankton taxa in the mesocosms. We then used those time series to evaluate total zooplankton biomass as an aggregate property and to evaluate community dynamics. For three of our four perturbation types, total zooplankton biomass was significantly less variable in systems with environmental variation than in constant environments. For the same three perturbation types, community-wide synchrony was much lower in fluctuating environments than in the constant environment, particularly at longer timescales (periods ≈ 60 d). Additionally, there were strong negative correlations between population temporal variances and the level of community-wide synchrony. Taken together, these results strongly imply that compensatory interactions between species stabilized total biomass in response to perturbations. Diversity did not differ significantly across either treatments or perturbation types, thus ruling out several classes of mechanisms driven by changes in diversity. We also used several pieces of secondary evidence to evaluate the particular mechanism behind compensatory responses since a wide variety of mechanisms are hypothesized to produce compensatory dynamics. We concluded that fluctuation dependent endogenous cycles that occur as a consequence of consumer-resource interactions in competitive communities were the most likely explanation for the compensatory dynamics observed in our experiment. As with our previous work, scale-dependent dynamics were also a key to understanding compensatory dynamics in these experimental communities. © 2016 by the Ecological Society of America.
Population growth is a variable open to change
NASA Astrophysics Data System (ADS)
Potts, M.
2016-12-01
The absolute number of people and the rate of population growth have an impact on climate mitigation, adaptation and possible conflict. Half the pregnancies in the US are unintended. Robust quantitative evidence from California demonstrates that improving access to family planning is the single most cost-effective way of mitigating our carbon footprint. Globally, there are 80 million unintended pregnancies annually. Many non-evidence barriers deprive women of the information and means required to separate sex from childbearing. Between 1960 and 1990, meeting the need for family planning led to a rapid fall in family size in much of Asia. Since 1990, funding for family planning has collapsed and fertility decline has stalled. The UN projects that by 2100 global population will increase by 3.8 billion (equal to world population in 1975). 80% of this growth will be in Africa. Studies project that climate change will undermine crop yields in parts of Africa, especially the Sahel. A high ratio of young males to the rest of the population is a risk factor in conflict. Today, only 1% of overseas assistance is allocated to family planning. Based on analysis of the past, doubling that investment would accelerate fertility decline, facilitating climate mitigation and adaptation, and possibly reducing conflict. Population and family planning were pushed off the international agenda by unacceptably and tragic episodes of coercion in China and India. However, there is compelling data that when voluntary family planning is widely available then family size can fall rapidly, as occurred in the Islamic Republic of Iran, where fertility fell more rapidly than in any other country in history. Family planning is listening to what women want not telling people want to do. Population growth is a variable open to change in a human rights framework. Population and family planning are variables relevant to the scientific agenda of the AGU.
Assessment of the foot and ankle in elite athletes.
Schon, Lew C
2009-06-01
An accurate assessment of the foot and ankle problem in elite athletes is the foundation of a treatment plan and prognosis. The special pressures of professional sports, where managers, agents, and lawyers may be involved, makes a thorough assessment especially critical for sound decision-making. Evaluation includes taking a history of the acute and chronic condition, including mechanism, physical sensation at injury, compensatory stresses, and general medical review. The athlete is assessed physically in several different ways, including comprehensive focal examination and alignment in static and dynamic nonweight-bearing and weight-bearing modes. This comprehensive process is essential to accurate assessment.
Is climate change modifying precipitation extremes?
NASA Astrophysics Data System (ADS)
Montanari, Alberto; Papalexiou, Simon Michael
2016-04-01
The title of the present contribution is a relevant question that is frequently posed to scientists, technicians and managers of local authorities. Although several research efforts were recently dedicated to rainfall observation, analysis and modelling, the above question remains essentially unanswered. The question comes from the awareness that the frequency of floods and the related socio-economic impacts are increasing in many countries, and climate change is deemed to be the main trigger. Indeed, identifying the real reasons for the observed increase of flood risk is necessary in order to plan effective mitigation and adaptation strategies. While mitigation of climate change is an extremely important issue at the global level, at small spatial scales several other triggers may interact with it, therefore requiring different mitigation strategies. Similarly, the responsibilities of administrators are radically different at local and global scales. This talk aims to provide insights and information to address the question expressed by its title. High resolution and long term rainfall data will be presented, as well as an analysis of the frequency of their extremes and its progress in time. The results will provide pragmatic indications for the sake of better planning flood risk mitigation policies.
Maleki, Maryam; Badri, Samaneh; Shayestehepour, Hamed; Arazpour, Mokhtar; Farahmand, Farzam; Mousavi, Mohamad Ebrahim; Abdolahi, Ehsan; Farkhondeh, Hasan; Head, John S; Golchin, Navid; Mardani, Mohammad Ali
2018-03-12
The aim of this study was to assess the performance of an original powered foot clearance creator (PFCC) mechanism worn in conjunction with an isocentric reciprocal gait orthosis (IRGO) and evaluate its effect on trunk compensatory movements and spatiotemporal parameters in nine healthy subjects. A PFCC motorized mechanism was designed that incorporated twin sole plates, the movements of which enabled increased toe to floor clearance during swing phase. A prototype was constructed in combination with an IRGO, and hence was re-named as an IRGO-PFCC orthosis. The effects of IRGO-PFCC usage on the spatiotemporal parameters and trunk compensatory movements during walking were then analyzed under two conditions, firstly with the PFCC 'active' i.e., with the motorized device functioning, and secondly inactive, where floor clearance was standard. Ambulating with IRGO-PFCC orthosis resulted in reduction in the spatiotemporal parameters of gait (speed of walking, cadence and stride length) in nine healthy subjects. Walking with IRGO-PFCC orthosis led to significant differences in lateral (p = .007) and vertical (p = .008) trunk compensatory movements. In other words, through using IRGO-PFCC orthosis, the lateral and vertical trunk compensatory movements decreased by 51.32% and 42.7%, respectively. An adapted PFCC mechanism, with a relatively small motor and power supply could effectively increase toe to floor clearance during swing phase and thereby decrease trunk compensatory motions and potentially improve energy consumption. Implications for rehabilitations •The High rejection rates of reciprocal gait orthoses are related to the increasing in energy expenditure and burden loads on the upper limb joints during walking following trunk compensatory movements.•An original powered foot clearance creator mechanism was designed and constructed to assisting floor clearance capability and reduce trunk compensatory movements in subjects with spinal cord injury during swing phase of gait.•This original powered foot clearance creator mechanism by using moveable soleplates and motorized actuation could decrease the trunk compensatory motions during the ambulation of nine healthy subjects.•More experiments are needed to investigate this mechanism on trunk compensatory movements of SCI subjects.
Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.
Jonathan Thompson
2007-01-01
The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoringâthe systematic observation and measurement of a set...
Reckien, Diana; Flacke, Johannes
2015-01-01
Cities are recognised as key players in global adaptation and mitigation efforts because the majority of people live in cities. However, in Europe, which is highly urbanized and one of the most advanced regions in terms of environmental policies, there is considerable diversity in the regional distribution, ambition and scope of climate change responses. This paper explores potential factors contributing to such diversity in 200 large and medium-sized cities across 11 European countries. We statistically investigate institutional, socio-economic, environmental and vulnerability characteristics of cities as potential drivers of or barriers to the development of urban climate change plans. Our results show that factors such as membership of climate networks, population size, GDP per capita and adaptive capacity act as drivers of mitigation and adaptation plans. By contrast, factors such as the unemployment rate, warmer summers, proximity to the coast and projected exposure to future climate impacts act as barriers. We see that, overall, it is predominantly large and prosperous cities that engage in climate planning, while vulnerable cities and those at risk of severe climate impacts in the future are less active. Our analysis suggests that climate change planning in European cities is not proactive, i.e. not significantly influenced by anticipated future impacts. Instead, we found that the current adaptive capacity of a city significantly relates to climate planning. Along with the need to further explore these relations, we see a need for more economic and institutional support for smaller and less resourceful cities and those at high risk from climate change impacts in the future. PMID:26317420
Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunnigan, James; DeShazer, Jay; Garrow, Larry
2005-06-01
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less
Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunnigan, James; DeShazer, Jay; Garrow, Larry
2004-06-01
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less
44 CFR 201.7 - Tribal Mitigation Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... events. (ii) A description of the Indian tribal government's vulnerability to the hazards described in... its impact on the tribe. The plan should describe vulnerability in terms of: (A) The types and numbers... or avoid long-term vulnerabilities to the identified hazards. (ii) A section that identifies and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-21
... transportation conformity revisions to the Kentucky State Implementation Plan (SIP) submitted by the Commonwealth...). This addition consists of transportation conformity criteria and procedures related to interagency consultation and enforceability of certain transportation-related control measures and mitigation measures. The...
75 FR 66319 - State Systems Advance Planning Document (APD) Process
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
...) equipment and services. The APD process was designed to mitigate financial risks, avoid incompatibilities... develop a General Systems Design (GSD). Implementation APD means a recorded plan of action to request Federal financial participation (FFP) in the costs of designing, developing and implementing the system...
NASA Astrophysics Data System (ADS)
Prenger-Berninghoff, Kathrin; Cortes, V. Juliette; Aye, Zar Chi; Sprague, Teresa
2013-04-01
The management of natural hazards involves, as generally known, the four stages of the risk management cycle: Prevention, preparedness, response and recovery. Accordingly, the mitigation of disasters can be performed in terms of short-term and long-term purposes. Whereas emergency management or civil protection helps to strengthen a community's capacity to be better prepared for natural hazards and to better respond in case a disaster strikes, thus addressing the short-term perspective, spatial planning serves long-term planning goals and can therefore implement long-term prevention measures. A purposefully applied risk mitigation strategy requires coordination of short-term and long-term mitigation measures and thus an effective coordination of emergency management and spatial planning. Several actors are involved in risk management and should consequently be linked throughout the whole risk management cycle. However, these actors, partly because of a historically fragmented administrative system, are hardly connected to each other, with spatial planning only having a negligible role compared to other actors1, a problem to which Young (2002) referred to as the "problem of interplay". In contrast, information transfer and decision-taking happen at the same time and are not coordinated among different actors. This applies to the prevention and preparedness phase as well as to the recovery phase, which basically constitutes the prevention phase for the next disaster2. Since investments in both risk prevention and emergency preparedness and response are considered necessary, a better coordination of the two approaches is required. In this regard, Decision Support Systems (DSS) can be useful in order to provide support in the decision-making aspect of risk management. The research work currently undertaken examines the problem of interplay in the four case study areas of the Marie Curie ITN, CHANGES3. The link between different risk management actors will be explored by means of exploratory questionnaires and interviews with government agencies, local administrations, community and research organizations on each study site. First results provided will address the general role of spatial planning in risk management. Additionally, preliminary observations are made in regard to the coordination of emergency preparedness and long-term spatial planning activities. The observations consider that integration facilitates proactive strategies that aim at preventing disaster occurrence and promote interaction between involved parties. Finally, consideration is given to the potential use of a DSS tool to cover both aspects of spatial planning and emergency management in the risk management cycle.
1988-05-01
compensatory operations as a dual-mods control -- a form where the control exerted is Initiated and largely accomplished by the precognitive action and then...function. Fig. 3.2 Compensatory control structure for 4-7 precognitive operation occur in a "dual- quality criteria one is referred to mode" control... precognitive action Tesil itatieet rpoas f and then completed with compensatory error- mil quent ei to eure a reduction operations (Ref. 11). certary eqe mso
Gunn, Tyler M.; Davis, Diane M.; Speicher, James E.; Rossi, Nicholas P.; Parekh, Kalpaj R.; Lynch, William R.; Iannettoni, Mark D.
2015-01-01
Objective Compensatory hyperhidrosis is a common devastating adverse effect following endoscopic thoracic sympathectomy for patients undergoing surgical treatment of primary hyperhidrosis. We sought to determine if there was a correlation in our patient population between the level and extent of sympathetic chain resection and the subsequent development of compensatory hyperhidrosis. Methods All patients undergoing endoscopic thoracic sympathectomy in the T2-3, T2-4, T2-5, or T2-6 levels for palmar or axillary hyperhidrosis at the University of Iowa Hospital and Clinics (n=97) between January 2004 and January 2013 were retrospectively reviewed. Results Differences in preoperative patient characteristics were not statistically significant between patients receiving either T2-3, T2-4, T2-5, or T2-6 level resections. Of the ninety-seven patients included in this study, twenty-eight patients (29%) experienced transient compensatory hyperhidrosis and four patients (4%) complained of severe compensatory hyperhidrosis and required further treatment. There were no operative mortalities and morbidity was similar amongst the groups. Conclusions Most patients had successful outcomes after undergoing extensive resection without change in incidence of compensatory hyperhidrosis. Therefore, we recommend performing a complete and adequate resection for relief of symptoms in patients with primary hyperhidrosis. PMID:25131173
Investigation of compensatory postures with videofluoromanometry in dysphagia patients
Solazzo, Antonio; Monaco, Luigi; Del Vecchio, Lucia; Tamburrini, Stefania; Iacobellis, Francesca; Berritto, Daniela; Pizza, Nunzia Luisa; Reginelli, Alfonso; Di Martino, Natale; Grassi, Roberto
2012-01-01
AIM: To investigate the effectiveness of head compensatory postures to ensure safe oropharyngeal transit. METHODS: A total of 321 dysphagia patients were enrolled and assessed with videofluoromanometry (VFM). The dysphagia patients were classified as follows: safe transit; penetration without aspiration; aspiration before, during or after swallowing; multiple aspirations and no transit. The patients with aspiration or no transit were tested with VFM to determine whether compensatory postures could correct their swallowing disorder. RESULTS: VFM revealed penetration without aspiration in 71 patients (22.1%); aspiration before swallowing in 17 patients (5.3%); aspiration during swallowing in 32 patients (10%); aspiration after swallowing in 21 patients (6.5%); multiple aspirations in six patients (1.9%); no transit in five patients (1.6%); and safe transit in 169 patients (52.6%). Compensatory postures guaranteed a safe transit in 66/75 (88%) patients with aspiration or no transit. A chin-down posture achieved a safe swallow in 42/75 (56%) patients, a head-turned posture in 19/75 (25.3%) and a hyperextended head posture in 5/75 (6.7%). The compensatory postures were not effective in 9/75 (12%) cases. CONCLUSION: VFM allows the speech-language the-rapist to choose the most effective compensatory posture without a trial-and-error process and check the effectiveness of the posture. PMID:22736921
Synchronous dynamics of zooplankton competitors prevail in temperate lake ecosystems.
Vasseur, David A; Fox, Jeremy W; Gonzalez, Andrew; Adrian, Rita; Beisner, Beatrix E; Helmus, Matthew R; Johnson, Catherine; Kratina, Pavel; Kremer, Colin; de Mazancourt, Claire; Miller, Elizabeth; Nelson, William A; Paterson, Michael; Rusak, James A; Shurin, Jonathan B; Steiner, Christopher F
2014-08-07
Although competing species are expected to exhibit compensatory dynamics (negative temporal covariation), empirical work has demonstrated that competitive communities often exhibit synchronous dynamics (positive temporal covariation). This has led to the suggestion that environmental forcing dominates species dynamics; however, synchronous and compensatory dynamics may appear at different length scales and/or at different times, making it challenging to identify their relative importance. We compiled 58 long-term datasets of zooplankton abundance in north-temperate and sub-tropical lakes and used wavelet analysis to quantify general patterns in the times and scales at which synchronous/compensatory dynamics dominated zooplankton communities in different regions and across the entire dataset. Synchronous dynamics were far more prevalent at all scales and times and were ubiquitous at the annual scale. Although we found compensatory dynamics in approximately 14% of all combinations of time period/scale/lake, there were no consistent scales or time periods during which compensatory dynamics were apparent across different regions. Our results suggest that the processes driving compensatory dynamics may be local in their extent, while those generating synchronous dynamics operate at much larger scales. This highlights an important gap in our understanding of the interaction between environmental and biotic forces that structure communities. © 2014 The Author(s) Published by the Royal Society. All rights reserved.
The effect of cane use on the compensatory step following posterior perturbations.
Hall, Courtney D; Jensen, Jody L
2004-08-01
The compensatory step is a critical component of the balance response and is impaired in older fallers. The purpose of this research was to examine whether utilization of a cane modified the compensatory step response following external posterior perturbations. Single subject withdrawal design was employed. Single subject statistical analysis--the standard deviation bandwidth-method--supplemented visual analysis of the data. Four older adults (range: 73-83 years) with balance impairment who habitually use a cane completed this study. Subjects received a series of sudden backward pulls that were large enough to elicit compensatory stepping. We examined the following variables both with and without cane use: timing of cane loading relative to step initiation and center of mass acceleration, stability margin, center of mass excursion and velocity, step length and width. No participant loaded the cane prior to initiation of the first compensatory step. There was no effect of cane use on the stability margin, nor was there an effect of cane use on center of mass excursion or velocity, or step length or width. These data suggest that cane use does not necessarily improve balance recovery following an external posterior perturbation when the individual is forced to rely on compensatory stepping. Instead these data suggest that the strongest factor in modifying step characteristics is experience with the perturbation.
Giorgini, Vincent; Gibson, Carter; Mecca, Jensen T.; Medeiros, Kelsey E.; Mumford, Michael D.; Connelly, Shane; Devenport, Lynn D.
2014-01-01
The study of ethical behavior and ethical decision making is of increasing importance in many fields, and there is a growing literature addressing the issue. However, research examining differences in ethical decision making across fields and levels of experience is limited. In the present study, biases that undermine ethical decision making and compensatory strategies that may aid ethical decision making were identified in a series of interviews with 63 faculty members across six academic fields (e.g. biological sciences, health sciences, social sciences) and three levels of rank (assistant professor, associate professor, and full professor) as well as across gender. The degree to which certain biases and compensatory strategies were used in justifications for responses to ethical situations was compared across fields, level of experience, and gender. Major differences were found across fields for several biases and compensatory strategies, including biases and compensatory strategies related to use of professional field principles and field-specific guidelines. Furthermore, full professors tend to differ greatly from assistant and associate professors on a number of constructs, and there were differences in the consistency with which biases and compensatory strategies were displayed within these various groups. Implications of these findings for ethics training and future research are discussed. PMID:25479960
Garner, Ashton; Davis-Becker, Kendra; Fischer, Sarah
2014-08-01
Compensatory exercise (exercise performed in an effort to control weight/shape or in response to caloric intake) and thinness expectancies (beliefs that thinness will improve the overall quality of life) are strongly linked to the development, maintenance, severity, and outcome of eating disorders. There is little literature, however, examining the relationship between compensatory exercise and thinness expectancies. The goal of the current study was to examine whether thinness expectancies contribute significant variance in the endorsement of excessive exercise over and above binge eating, restraint, and shape and weight concerns. A total of 677 undergraduate women (mean age=18.73) completed self-report measures of thinness expectancies and eating disorder symptoms (TREI and EDE-Q). There was a significant association between thinness expectancies and frequency of compensatory exercise behavior. Restraint and subjective binge episodes accounted for significant variance in compensatory exercise. Frequency of objective binge episodes did not, nor did endorsement of thinness expectancies. These findings suggest a potential profile of individuals engaging in compensatory exercise as individuals who actively restrict their diets, feel as if they have binged when they violate those restrictions, and feel the need to excessively exercise to compensate for the subjective binges. Copyright © 2014 Elsevier Ltd. All rights reserved.
Kubicek-Sutherland, Jessica Z; Heithoff, Douglas M; Ersoy, Selvi C; Shimp, William R; Mahan, Michael J
2014-03-14
Yersinia pseudotuberculosis is a foodborne pathogen that can cause serious human illness. Although the source and route of transmission often remain obscure, livestock have been implicated in some cases. The diversity of yersiniae present on farms and their widespread distribution in animal and environmental reservoirs necessitates the use of broad prophylactic strategies that are efficacious against many serotypes simultaneously. Herein, immunization of mice with a modified, live attenuated Y. pseudotuberculosis vaccine that overproduces the DNA adenine methylase (Dam(OP)) conferred robust protection against virulent challenge (150-fold LD50) with homologous and heterologous serotypes that have been associated with human disease (O:1, O:1a, O:3). Further, the dam gene was shown to be essential for cell viability in all (7 of 7) Y. pseudotuberculosis strains tested. Direct selection for the inheritance of dam mutant alleles in Y. pseudotuberculosis resulted in dam strain variants that contained compensatory (second-site suppressor) mutations in genes encoding methyl-directed mismatch repair proteins (mutHLS) that are involved in suppression of the non-viable cell phenotype in all (19/19) strains tested. Such dam mutH variants exhibited a significant increase in virulence and spontaneous mutation frequency relative to that of a Dam(OP) vaccine strain. These studies indicate that Y. pseudotuberculosis Dam(OP) strains conferred potent cross-protective efficacy as well as decreased virulence and spontaneous mutation frequency relative to those that lack Dam, which have compensatory mutations in mutHLS loci. These data suggest that development of yersiniae livestock vaccines based on Dam overproduction is a viable mitigation strategy to reduce these potential foodborne contaminants. Copyright © 2014 Elsevier Ltd. All rights reserved.
A dynamic model for costing disaster mitigation policies.
Altay, Nezih; Prasad, Sameer; Tata, Jasmine
2013-07-01
The optimal level of investment in mitigation strategies is usually difficult to ascertain in the context of disaster planning. This research develops a model to provide such direction by relying on cost of quality literature. This paper begins by introducing a static approach inspired by Joseph M. Juran's cost of quality management model (Juran, 1951) to demonstrate the non-linear trade-offs in disaster management expenditure. Next it presents a dynamic model that includes the impact of dynamic interactions of the changing level of risk, the cost of living, and the learning/investments that may alter over time. It illustrates that there is an optimal point that minimises the total cost of disaster management, and that this optimal point moves as governments learn from experience or as states get richer. It is hoped that the propositions contained herein will help policymakers to plan, evaluate, and justify voluntary disaster mitigation expenditures. © 2013 The Author(s). Journal compilation © Overseas Development Institute, 2013.
Strategy for Mitigating Collision Between Landsat-5 and the Afternoon Constellation
NASA Technical Reports Server (NTRS)
Levi, Joshua A.; Palmer, Eric J.
2011-01-01
The NASA Goddard Space Flight Center Earth Science Mission Operations project, the French space agency Centre National d tudes Spatiales, the Argentinian space agency Comisi n Nacional de Actividades Espaciales, and the United States Geological Survey all operate spacecraft in sun-synchronous frozen orbits. The orbits are planned to not place any of the spacecraft at risk of colliding with another. However, evolution of these orbits over time has com-promised the safe interaction between Landsat-5 and the Afternoon Constella-tion. This paper analyzes the interactions between the Landsat-5 spacecraft and the Afternoon Constellation members over a period of 6 years, describing the current risk and plan to mitigate collisions in the future.
2009-09-23
hawthorn, buffaloberry and snowberry also are found in the area. In wetland areas, predominant species include Typha sp., smartweed, wild millet, cord...does not straddle the airfield flight line fence. This location will require wetland mitigation for 0.03 wetlands determined to be jurisdictional by... wetlands construction or restoration at either a wetland mitigation bank or a suitable location on base. A formal mitigation plan will be developed
Successes and Challenges in Implementation of Radon Control Activities in Iowa, 2010–2015
Abbott, Anne L.; Miller, Laura L.
2016-01-01
Background Radon gas has recently become more prominent in discussions of lung cancer prevention nationally and in Iowa. A review in 2013 of cancer plans in the National Comprehensive Cancer Control Program found that 42% of cancer plans, including Iowa’s, had terminology on radon. Plans included awareness activities, home testing, remediation, policy, and policy evaluation. Community Context Iowa has the highest average radon concentrations in the United States; 70% of homes have radon concentrations above the Environmental Protection Agency’s action levels. Radon control activities in Iowa are led by the Iowa Cancer Consortium, the Iowa Department of Public Health, and the Iowa Radon Coalition. Methods A collaborative approach was used to increase levels of awareness, testing, and (if necessary) mitigation, and to introduce a comprehensive radon control policy in Iowa by engaging partners and stakeholders across the state. Outcome The multipronged approach and collaborative work in Iowa appears to have been successful in increasing awareness: the number of radon tests completed in Iowa increased by 20% from 19,600 in 2009 to 23,500 in 2014, and the number of mitigations completed by certified mitigators increased by 108% from 2,600 to more than 5,400. Interpretation Through collaboration, Iowa communities are engaged in activities that led to increases in awareness, testing, mitigation, and policy. States interested in establishing a similar program should consider a multipronged approach involving multiple entities and stakeholders with different interests and abilities. Improvements in data collection and analysis are necessary to assess impact. PMID:27079648
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-17
... FDIC is responsible for administering or enforcing. The FDIC also has authority to adopt regulations... strategies, strategies to mitigate systemic risks and overall planning for an orderly resolution in the..., describing means of preserving franchise value, maximizing recovery to creditors, and minimizing systemic...
DOT National Transportation Integrated Search
1996-12-01
THIS PROJECT IDENTIFIED TRAFFIC PARAMETERS AND THEIR REQUIRED ACCURACIES FOR CHARACTERIZING TRAFFIC FLOW IN CONVENTIONAL AND NEWER INTELLIGENT TRANSPORTATION SYSTEMS (ITS), OBTAINED STATE-OF-THE-ART DETECTORS AND INSTALLED AND EVALUATED THEM IN THREE...
76 FR 78916 - Rice Solar Energy Project Record of Decision (DOE/EIS-0439)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-20
... Protection Plan. The Biological Resources Mitigation Implementation and Monitoring Plan will include accurate... consideration that water is a limited resource, the Project owner would use dry cooling, which avoids... markets and transmits wholesale electrical power through an integrated 17,000-circuit mile, high- voltage...
ERIC Educational Resources Information Center
Hoepfner, Ralph; And Others
Sampling techniques used in "A Study of the Sustaining Effects of Compensatory Education" are described in detail. The Sustaining Effects Study is a large, multi-faceted study of issues related to the compensatory education of elementary school students. Public elementary schools that include grades between one and six are eligible for…
L-325 Sagebrush Habitat Mitigation Project: FY2009 Compensation Area Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durham, Robin E.; Sackschewsky, Michael R.
2009-09-29
Annual monitoring in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades was conducted in June 2009. MAP guidelines defined mitigation success for this project as 3000 established sagebrush transplants on a 4.5 ha mitigation site after five monitoring years. Annual monitoring results suggest that an estimated 2130 sagebrush transplants currently grow on the site. Additional activities in support of this project included gathering sagebrush seed and securing a local grower to produce between 2250 and 2500 10-in3 tublings for outplanting during the early winter months of FY2010. If the minimummore » number of seedlings grown for this planting meets quality specifications, and planting conditions are favorable, conservative survival estimates indicate the habitat mitigation goals outlined in the MAP will be met in FY2014.« less
Fluor Daniel Hanford implementation plan for DOE Order 5480.28, Natural phenomena hazards mitigation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrads, T.J.
1997-09-12
Natural phenomena hazards (NPH) are unexpected acts of nature that pose a threat or danger to workers, the public, or the environment. Earthquakes, extreme winds (hurricane and tornado), snow, flooding, volcanic ashfall, and lightning strikes are examples of NPH that could occur at the Hanford Site. U.S. Department of Energy (DOE) policy requires facilities to be designed, constructed, and operated in a manner that protects workers, the public, and the environment from hazards caused by natural phenomena. DOE Order 5480.28, Natural Phenomena Hazards Mitigation, includes rigorous new natural phenomena criteria for the design of new DOE facilities, as well asmore » for the evaluation and, if necessary, upgrade of existing DOE facilities. The Order was transmitted to Westinghouse Hanford Company in 1993 for compliance and is also identified in the Project Hanford Management Contract, Section J, Appendix C. Criteria and requirements of DOE Order 5480.28 are included in five standards, the last of which, DOE-STD-1023, was released in fiscal year 1996. Because the Order was released before all of its required standards were released, enforcement of the Order was waived pending release of the last standard and determination of an in-force date by DOE Richland Operations Office (DOE-RL). Agreement also was reached between the Management and Operations Contractor and DOE-RL that the Order would become enforceable for new structures, systems, and components (SSCS) 60 days following issue of a new order-based design criteria in HNF-PRO-97, Engineering Design and Evaluation. The order also requires that commitments addressing existing SSCs be included in an implementation plan that is to be issued 1 year following the release of the last standard. Subsequently, WHC-SP-1175, Westinghouse Hanford Company Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, Rev. 0, was issued in November 1996, and this document, HNF-SP-1175, Fluor Daniel Hanford Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, is Rev. 1 of that plan.« less
2011-01-01
Background Influenza viruses are a major cause of morbidity and mortality worldwide. Vaccination remains a powerful tool for preventing or mitigating influenza outbreaks. Yet, vaccine supplies and daily administration capacities are limited, even in developed countries. Understanding how such constraints can alter the mitigating effects of vaccination is a crucial part of influenza preparedness plans. Mathematical models provide tools for government and medical officials to assess the impact of different vaccination strategies and plan accordingly. However, many existing models of vaccination employ several questionable assumptions, including a rate of vaccination proportional to the population at each point in time. Methods We present a SIR-like model that explicitly takes into account vaccine supply and the number of vaccines administered per day and places data-informed limits on these parameters. We refer to this as the non-proportional model of vaccination and compare it to the proportional scheme typically found in the literature. Results The proportional and non-proportional models behave similarly for a few different vaccination scenarios. However, there are parameter regimes involving the vaccination campaign duration and daily supply limit for which the non-proportional model predicts smaller epidemics that peak later, but may last longer, than those of the proportional model. We also use the non-proportional model to predict the mitigating effects of variably timed vaccination campaigns for different levels of vaccination coverage, using specific constraints on daily administration capacity. Conclusions The non-proportional model of vaccination is a theoretical improvement that provides more accurate predictions of the mitigating effects of vaccination on influenza outbreaks than the proportional model. In addition, parameters such as vaccine supply and daily administration limit can be easily adjusted to simulate conditions in developed and developing nations with a wide variety of financial and medical resources. Finally, the model can be used by government and medical officials to create customized pandemic preparedness plans based on the supply and administration constraints of specific communities. PMID:21806800
NASA Astrophysics Data System (ADS)
Bethel, M.; Braud, D.; Lambeth, T.; Biber, P.; Wu, W.
2017-12-01
Coastal community leaders, government officials, and natural resource managers must be able to accurately assess and predict a given coastal landscape's sustainability and/or vulnerability as coastal habitat continues to undergo rapid and dramatic changes associated with natural and anthropogenic activities such as accelerated relative sea level rise (SLR). To help address this information need, a multi-disciplinary project team conducted Sea Grant sponsored research in Louisiana and Mississippi with traditional ecosystem users and natural resource managers to determine a method for producing localized vulnerability and sustainability maps for projected SLR and storm surge impacts, and determine how and whether the results of such an approach can provide more useful information to enhance hazard mitigation planning. The goals of the project are to develop and refine SLR visualization tools for local implementation in areas experiencing subsidence and erosion, and discover the different ways stakeholder groups evaluate risk and plan mitigation strategies associated with projected SLR and storm surge. Results from physical information derived from data and modeling of subsidence, erosion, engineered restoration and coastal protection features, historical land loss, and future land projections under SLR are integrated with complimentary traditional ecological knowledge (TEK) offered by the collaborating local ecosystem users for these assessments. The data analysis involves interviewing stakeholders, coding the interviews for themes, and then converting the themes into vulnerability and sustainability factors. Each factor is weighted according to emphasis by the TEK experts and number of experts who mention it to determine which factors are the highest priority. The priority factors are then mapped with emphasis on the perception of contributing to local community vulnerability or sustainability to SLR and storm surge. The maps are used by the collaborators to benefit local hazard mitigation and adaptation planning. The results to date in achieving the project objectives will be presented that include: analyses of scientific field data collected related to marsh vegetation biomass characteristics, analyses of TEK data collected, and mapping products developed.
Higgins, Torrance J.; Janelle, Christopher M.; Naugle, Kelly M.; Knaggs, Jeffrey; Hoover, Brian M.; Marsiske, Michael; Manini, Todd M.
2012-01-01
Classic developmental theory suggests that aging is associated with using compensatory strategies to prolong independence. While compensatory strategies are typically considered positive adaptations, they also signify an early phase in the disablement process — commonly known as pre-clinical disability. To build a better understanding of psychological constructs related to these early signs of disability, we examined the contribution of self-efficacy and state anxiety on using compensatory strategies among pre-clinically disabled older adults. Compensatory strategies were observed during performance of daily activities in 257 pre-clinically disabled older adults (67.6 ± 7.04), and self-efficacy and state anxiety were evaluated prior to performing each task. In univariate models, lower self-efficacy and higher anxiety were associated with more compensation (Spearman correlations: 0.15-0.48, p < 0.05). Multivariate logistic regression indicated that low self-efficacy [Odds Ratio (OR): 1.70; 95% Confidence Interval (CI): 1.40-2.08) and high anxiety (OR: 1.34; 95% CI: 1.10-1.63) were positively associated with using ≥ 6 compensatory strategies – a level signifying substantial compensation. When considered jointly with self-efficacy, the association with anxiety was reversed— higher anxiety demonstrated a lower likelihood of using compensation (OR: 0.70-0.73; 95% CI: 0.50-0.99). The addition of self-efficacy might remove the self-defeating cognitions characterizing anxiety allowing the remaining arousal component to appear beneficial. In conclusion, lower self-efficacy and higher anxiety are associated with using compensation to complete daily tasks among pre-clinically disabled older adults. Such psychological constructs may contribute to the use of compensatory strategies and represent future intervention targets to help reduce early signs of disability. PMID:22770713
Kim, Do Hyung; Paik, Hyo Chae; Lee, Doo Yun
2004-08-01
The main cause of dissatisfaction after sympathetic trunk blocking surgery (T2 sympathectomy, sympathetic clipping) for craniofacial hyperhidrosis is compensatory sweating. Preserving sympathetic trunk may decrease the incidence of compensatory sweating, and we introduce T2 ramicotomy, which may better preserve the sympathetic nerve trunk in order to reduce compensatory sweating. From January 2000 to November 2002, video-assisted thoracoscopic (VAT) T2 sympathetic clipping and VAT ramicotomy were performed in 44 patients suffering from craniofacial hyperhidrosis. Twenty-two patients underwent T2 sympathetic clipping (group 1), and 22 underwent division of T2 rami-communicantes (group 2). We retrospectively analyzed the rate of satisfaction, dryness of face, and grade of compensatory sweating. Both groups were similar with respect to facial dryness (P = 0.099). Group 1: excessive dry 5 patients (22.7%), dry 17 patients (77.3%); group 2: excessive dry 3 patients (13.6%), dry 15 patients (68.1%), and persistent sweating 4 patients (18.3%). The rate of satisfaction was 77.3% in group 1, and 63.6% in group 2 with no significant difference (P > 0.05). The rate of compensatory sweating in group 2 (72.7%) was significantly lower than in group 1 (95.4%) (P < 0.039). The chance of embarrassing and disabling compensatory sweating was lower in group 2 than in group 1; 76.5% (embarrassing in 8 patients, disabling in 9) in group 1, and 36.4% (embarrassing in 7 patients, disabling in 1) in group 2 which was statistically significant (P < 0.006). T2 ramicotomy for craniofacial hyperhidrosis lowers the rate of compensatory sweating and excessive dryness of face compared to T2 clipping.
Casey, Darren P; Treichler, David P; Ganger, Charles T; Schneider, Aaron C; Ueda, Kenichi
2015-01-15
We have previously demonstrated that aging reduces the compensatory vasodilator response during hypoxic exercise due to blunted nitric oxide (NO) signaling. Recent evidence suggests that NO bioavailability can be augmented by dietary nitrate through the nitrate-nitrite pathway. Thus we tested the hypothesis that acute dietary nitrate supplementation increases the compensatory vasodilator response to hypoxic exercise, particularly in older adults. Thirteen young (25 ± 1 yr) and 12 older (64 ± 2 yr) adults performed rhythmic forearm exercise at 20% of maximum voluntary contraction during normoxia and hypoxia (∼80% O2 saturation); both before (control) and 3 h after beetroot juice (BR) consumption. Forearm vascular conductance (FVC; ml·min(-1)·100 mmHg(-1)) was calculated from forearm blood flow (ml/min) and blood pressure (mmHg). Compensatory vasodilation was defined as the relative increase in FVC due to hypoxic exercise (i.e., % increase compared with respective normoxic exercise trial). Plasma nitrite was determined from venous blood samples obtained before the control trials and each of the exercise trials (normoxia and hypoxia) after BR. Consumption of BR increased plasma nitrite in both young and older adults (P < 0.001). During the control condition, the compensatory vasodilator response to hypoxic exercise was attenuated in older compared with young adults (3.8 ± 1.7% vs. 14.2 ± 1.2%, P < 0.001). Following BR consumption, compensatory vasodilation did not change in young (13.7 ± 3.3%, P = 0.81) adults but was substantially augmented in older adults (11.4 ± 2.1%, P < 0.01). Our data suggest that acute dietary nitrate supplementation increases the compensatory vasodilator response to hypoxic exercise in older but not young adults. Copyright © 2015 the American Physiological Society.
Driven exercise in the absence of binge eating: Implications for purging disorder.
Lydecker, Janet A; Shea, Megan; Grilo, Carlos M
2018-02-01
Purging disorder (PD) is characterized by recurrent purging without objectively large binge-eating episodes. PD has received relatively little attention, and questions remain about the clinical significance of "purging" by exercise that is driven or compulsive (i.e., as extreme compensatory or weight-control behavior). The little available research suggests that individuals who use exercise as a compensatory behavior might have less eating-disorder psychopathology than those who purge by vomiting or laxatives, but those studies have had smaller sample sizes, defined PD using low-frequency thresholds, and defined exercise without weight-compensatory or driven elements. Participants (N = 2,017) completed a web-based survey with established measures of eating-disorder psychopathology, depression, and physical activity. Participants were categorized (regular compensatory driven exercise, PD-E, n = 297; regular compensatory vomiting/laxatives, PD-VL, n = 59; broadly defined anorexia nervosa, AN, n = 20; and no eating-disordered behaviors, NED, n = 1,658) and compared. PD-E, PD-VL, and AN had higher eating-disorder psychopathology and physical activity than NED but did not significantly differ from each other on most domains. PD-VL and AN had higher depression than PD-E, which was higher than NED. Findings suggest that among participants with regularly compensatory behaviors without binge eating, those who use exercise alone have similar levels of associated eating-disorder psychopathology as those who use vomiting/laxatives, although they have lower depression levels and overall frequency of purging. Findings provide further support for the clinical significance of PD. Clinicians and researchers should recognize the severity of driven exercise as a compensatory behavior, and the need for further epidemiological and treatment research. © 2017 Wiley Periodicals, Inc.
Theoretical, practical, and social issues in behavioral treatments of obesity.
Wooley, S C; Wooley, O W; Dyrenforth, S R
1979-01-01
Although showing superior maintenance, behavioral treatments of obesity typically produce small weight losses at a decelerating rate. Rather than reflecting poor compliance with treatment, these findings are consistent with known compensatory metabolic changes that operate to slow weight loss and promote regain. Other problems associated with dieting include failure of caloric regulation, hyper-responsivity to food palatability, and hunger, which is greater under conditions of moderate restriction and unpredictability of access to food. The inevitability of treatment failure in many instances must be faced and efforts made to prevent further worsening of the obese patient's self-esteem. Prognosis and treatment planning may be aided by consideration of the historical difficulties of weight loss, the degree of hunger experienced on diets, which may reflect important physiological differences among individuals, and the use of food to optimize arousal level. Full involvement of the patient in setting goals and planning treatment is recommended. PMID:468747
Potter, Margaret A; Brown, Shawn T; Cooley, Phillip C; Sweeney, Patricia M; Hershey, Tina B; Gleason, Sherrianne M; Lee, Bruce Y; Keane, Christopher R; Grefenstette, John; Burke, Donald S
2012-11-14
States' pandemic influenza plans and school closure statutes are intended to guide state and local officials, but most faced a great deal of uncertainty during the 2009 influenza H1N1 epidemic. Questions remained about whether, when, and for how long to close schools and about which agencies and officials had legal authority over school closures. This study began with analysis of states' school-closure statutes and pandemic influenza plans to identify the variations among them. An agent-based model of one state was used to represent as constants a population's demographics, commuting patterns, work and school attendance, and community mixing patterns while repeated simulations explored the effects of variations in school closure authority, duration, closure thresholds, and reopening criteria. The results show no basis on which to justify statewide rather than school-specific or community-specific authority for school closures. Nor do these simulations offer evidence to require school closures promptly at the earliest stage of an epidemic. More important are criteria based on monitoring of local case incidence and on authority to sustain closure periods sufficiently to achieve epidemic mitigation. This agent-based simulation suggests several ways to improve statutes and influenza plans. First, school closure should remain available to state and local authorities as an influenza mitigation strategy. Second, influenza plans need not necessarily specify the threshold for school closures but should clearly define provisions for early and ongoing local monitoring. Finally, school closure authority may be exercised at the statewide or local level, so long as decisions are informed by monitoring incidence in local communities and schools.
Galvez, David A.; Zhang, Bin; Najar, Ahmed
2014-01-01
Plant ecologists have debated the mechanisms used by plants to cope with the impact of herbivore damage. While plant resistance mechanisms have received much attention, plant compensatory growth as a type of plant tolerance mechanisms has been less studied. We conducted a greenhouse experiment to evaluate compensatory growth for trembling aspen (Populus tremuloides) seedlings under varying intensities and frequencies of simulated defoliation, with or without nutrient enriched media. For the purpose of this study, changes in biomass production and non-structural carbohydrate concentrations (NSC) of roots and leaves were considered compensatory responses. All defoliated seedlings showed biomass accumulation under low defoliation intensity and frequency, regardless of resource availability; however, as defoliation intensity and frequency increased, compensatory growth of seedlings was altered depending on resource availability. Seedlings in a resource-rich environment showed complete compensation, in contrast responses ranged from undercompensation to complete compensation in a resource-limited environment. Furthermore, at the highest defoliation intensity and frequency, NSC concentrations in leaves and roots were similar between defoliated and non-defoliated seedlings in a resource-rich environment; in contrast, defoliated seedlings with limited resources sustained the most biomass loss, had lower amounts of stored NSC. Using these results, we developed a new predictive framework incorporating the interactions between frequency and intensity of defoliation and resource availability as modulators of plant compensatory responses. PMID:25083352
Gunn, Tyler M; Davis, Diane M; Speicher, James E; Rossi, Nicholas P; Parekh, Kalpaj R; Lynch, William R; Iannettoni, Mark D
2014-12-01
Compensatory hyperhidrosis is a common devastating adverse effect after endoscopic thoracic sympathectomy for patients undergoing surgical treatment of primary hyperhidrosis. We sought to determine whether a correlation existed in our patient population between the level and extent of sympathetic chain resection and the subsequent development of compensatory hyperhidrosis. All patients undergoing endoscopic thoracic sympathectomy in the T2-T3, T2-T4, T2-T5, or T2-T6 levels for palmar or axillary hyperhidrosis at the University of Iowa Hospital and Clinics (n = 97) from January 2004 to January 2013 were retrospectively reviewed. Differences in the preoperative patient characteristics were not statistically significant among the patients receiving T2-T3, T2-T4, T2-T5, or T2-T6 level resections. Of the 97 included patients, 28 (29%) experienced transient compensatory hyperhidrosis and 4 (4%) complained of severe compensatory hyperhidrosis and required additional treatment. No operative mortalities occurred, and the morbidity was similar among the groups. Most patients had successful outcomes after undergoing extensive resection without changes in the incidence of compensatory hyperhidrosis. Therefore, we recommend performing complete and adequate resection for relief of symptoms in patients with primary hyperhidrosis. Copyright © 2014 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.
Categorization of compensatory motions in transradial myoelectric prosthesis users.
Hussaini, Ali; Zinck, Arthur; Kyberd, Peter
2017-06-01
Prosthesis users perform various compensatory motions to accommodate for the loss of the hand and wrist as well as the reduced functionality of a prosthetic hand. Investigate different compensation strategies that are performed by prosthesis users. Comparative analysis. A total of 20 able-bodied subjects and 4 prosthesis users performed a set of bimanual activities. Movements of the trunk and head were recorded using a motion capture system and a digital video recorder. Clinical motion angles were calculated to assess the compensatory motions made by the prosthesis users. The video recording also assisted in visually identifying the compensations. Compensatory motions by the prosthesis users were evident in the tasks performed (slicing and stirring activities) as compared to the benchmark of able-bodied subjects. Compensations took the form of a measured increase in range of motion, an observed adoption of a new posture during task execution, and prepositioning of items in the workspace prior to initiating a given task. Compensatory motions were performed by prosthesis users during the selected tasks. These can be categorized into three different types of compensations. Clinical relevance Proper identification and classification of compensatory motions performed by prosthesis users into three distinct forms allows clinicians and researchers to accurately identify and quantify movement. It will assist in evaluating new prosthetic interventions by providing distinct terminology that is easily understood and can be shared between research institutions.
Xie, Yanjun; Anson, Eric R; Simonsick, Eleanor M; Studenski, Stephanie A; Agrawal, Yuri
2017-03-01
To determine whether compensatory saccade metrics observed in the video head impulse test, specifically saccade amplitude and latency, predict physical performance. Cross-sectional analysis of the Baltimore Longitudinal Study of Aging, a prospective cohort study. National Institute on Aging Intramural Research Program Clinical Research Unit in Baltimore, Maryland. Community-dwelling older adults. Video head impulse testing was performed, and compensatory saccades and horizontal vestibulo-ocular reflex (VOR) gain were measured. Physical performance was assessed using the Short Physical Performance Battery (SPPB), which included the feet side-by-side, semitandem, tandem, and single-leg stance; repeated chair stands; and usual gait speed measurements. Compensatory saccade amplitude and latency, VOR gain, and SPPB performance. In 183 participants who underwent vestibular and SPPB testing (mean age 71.8 yr; 53% females), both higher mean saccade amplitude (odds ratio [OR] =1.62, p = 0.010) and shorter mean saccade latency (OR = 0.88, p = 0.004) were associated with a higher odds of failing the tandem stand task. In contrast, VOR gain was not associated with any physical performance measure. We observed in a cohort of healthy older adults that compensatory saccade amplitude and latency were associated with tandem stance performance. Compensatory saccade metrics may provide insights into capturing the impact of vestibular loss on physical function in older adults.
Oxidative Stress, Aging and CNS disease in the Canine Model of Human Brain Aging
Head, Elizabeth; Rofina, Jaime; Zicker, Steven
2008-01-01
SYNOPSIS Decline in cognitive functions that accompany aging in dogs may have a biological basis, and many of the disorders associated with aging in canines may be mitigated through dietary modifications that incorporate specific nutraceuticals. Based on previous research and the results of both laboratory and clinical studies – antioxidants may be one class of nutraceutical that provides benefits to aged dogs. Brains of aged dogs accumulate oxidative damage to proteins and lipids, which may lead to dysfunction of neuronal cells. The production of free radicals and lack of increase in compensatory antioxidant enzymes may lead to detrimental modifications to important macromolecules within neurons. Reducing oxidative damage through food ingredients rich in a broad spectrum of antioxidants significantly improves, or slows the decline of, learning and memory in aged dogs. However, determining all effective compounds and combinations, dosage ranges, as well as when to initiate intervention and long term effects constitute gaps in our current knowledge. PMID:18249248
Examination of Icing Induced Loss of Control and Its Mitigations
NASA Technical Reports Server (NTRS)
Reehorst, Andrew L.; Addy, Harold E., Jr.; Colantonio, Renato O.
2010-01-01
Factors external to the aircraft are often a significant causal factor in loss of control (LOC) accidents. In today s aviation world, very few accidents stem from a single cause and typically have a number of causal factors that culminate in a LOC accident. Very often the "trigger" that initiates an accident sequence is an external environment factor. In a recent NASA statistical analysis of LOC accidents, aircraft icing was shown to be the most common external environmental LOC causal factor for scheduled operations. When investigating LOC accident or incidents aircraft icing causal factors can be categorized into groups of 1) in-flight encounter with super-cooled liquid water clouds, 2) take-off with ice contamination, or 3) in-flight encounter with high concentrations of ice crystals. As with other flight hazards, icing induced LOC accidents can be prevented through avoidance, detection, and recovery mitigations. For icing hazards, avoidance can take the form of avoiding flight into icing conditions or avoiding the hazard of icing by making the aircraft tolerant to icing conditions. Icing detection mitigations can take the form of detecting icing conditions or detecting early performance degradation caused by icing. Recovery from icing induced LOC requires flight crew or automated systems capable of accounting for reduced aircraft performance and degraded control authority during the recovery maneuvers. In this report we review the icing induced LOC accident mitigations defined in a recent LOC study and for each mitigation describe a research topic required to enable or strengthen the mitigation. Many of these research topics are already included in ongoing or planned NASA icing research activities or are being addressed by members of the icing research community. These research activities are described and the status of the ongoing or planned research to address the technology needs is discussed
National Wetland Mitigation Banking Study Wetland Migitation Banking.
1994-02-01
the rest, but granted easements to HBWC 4. Mid City Ranch Humboldt CA Fish & Game CA Fish & Game, Humboldt CA Fish & Game County , CA City of...Eureka, Humboldt County County , City of Eureka 5. Mission Viejo/ Orange Mission Viejo USFWS, CA Dept. multiple - public- Orange ACWHEP...Broadway Wetlands Restoration Conceptual Plan yes in Humboldt County 6 - acre bank on 13-acre parcel mitigates for ’pockef marshes (2 acres
NASA Technical Reports Server (NTRS)
Adams, Robert B.; LaPointe, Michael; Wilks, Rod; Allen, Brian
2009-01-01
This poster reviews the planning and design for an integrated architecture for characterization, mitigation, scientific evaluation and resource utilization of near earth objects. This includes tracks to observe and characterize the nature of the threat posed by a NEO, and deflect if a significant threat is posed. The observation stack can also be used for a more complete scientific analysis of the NEO.
Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.
2011-01-01
The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.
Focusing Events and Constrains on Policy Addressing Long-Term Climate Change Risks
NASA Astrophysics Data System (ADS)
O'Donovan, K.
2014-12-01
When policy makers are aware of immediate and long-term risks to communities, what do they do to plan for and mitigate the effects of climate change? This paper addresses that question in two ways. First, as an organizing framework it presents an overview of the empirical evidence on focusing events. Focusing events are defined as sudden, rare events that reveal harm or the potential for future harm that the general public and policy makers become aware of simultaneously. These large-scale events are typically natural and disasters, crisis, or technological accidents. This paper considers the empirical evidence of the relationship between focusing events, the harm revealed by the event and policy change aimed at reducing future risk of harm. Second, this paper reviews the case of flood mitigation policy in the United States from 1968 to 2008. It considers the ways in which policy makers have and have not integrated future flood risks into mitigation policy and planning, particularly after large-scale floods. It analyzes the political, intergovernmental, demographic and geographic factors that have promoted and constrained long-term flood mitigation policy. This paper concludes with a discussion of the meaning and implications of potential focusing events and constrains on policy for long-term climate change concerns.
Sitek, Kevin R.; Cai, Shanqing; Beal, Deryk S.; Perkell, Joseph S.; Guenther, Frank H.; Ghosh, Satrajit S.
2016-01-01
Persistent developmental stuttering is characterized by speech production disfluency and affects 1% of adults. The degree of impairment varies widely across individuals and the neural mechanisms underlying the disorder and this variability remain poorly understood. Here we elucidate compensatory mechanisms related to this variability in impairment using whole-brain functional and white matter connectivity analyses in persistent developmental stuttering. We found that people who stutter had stronger functional connectivity between cerebellum and thalamus than people with fluent speech, while stutterers with the least severe symptoms had greater functional connectivity between left cerebellum and left orbitofrontal cortex (OFC). Additionally, people who stutter had decreased functional and white matter connectivity among the perisylvian auditory, motor, and speech planning regions compared to typical speakers, but greater functional connectivity between the right basal ganglia and bilateral temporal auditory regions. Structurally, disfluency ratings were negatively correlated with white matter connections to left perisylvian regions and to the brain stem. Overall, we found increased connectivity among subcortical and reward network structures in people who stutter compared to controls. These connections were negatively correlated with stuttering severity, suggesting the involvement of cerebellum and OFC may underlie successful compensatory mechanisms by more fluent stutterers. PMID:27199712
Radon mitigation for the SuperCDMS SNOLAB dark matter experiment
NASA Astrophysics Data System (ADS)
Street, J.; Bunker, R.; Miller, E. H.; Schnee, R. W.; Snyder, S.; So, J.
2018-01-01
A potential background for the SuperCDMS SNOLAB dark matter experiment is from radon daughters that have plated out onto detector surfaces. To reach desired backgrounds, understanding plate-out rates during detector fabrication as well as mitigating radon in surrounding air is critical. A radon mitigated cleanroom planned at SNOLAB builds upon a system commissioned at the South Dakota School of Mines & Technology (SD Mines). The ultra-low radon cleanroom at SD Mines has air supplied by a vacuum-swing-adsorption radon mitigation system that has achieved >1000× reduction for a cleanroom activity consistent with zero and <0.067 Bq m-3 at 90% confidence. Our simulation of this system, validated against calibration data, provides opportunity for increased understanding and optimization for this and future systems.
Public Response to Community Mitigation Measures for Pandemic Influenza
Koonin, Lisa M.; Benson, John M.; Cetron, Martin S.; Pollard, William E.; Mitchell, Elizabeth W.; Weldon, Kathleen J.; Herrmann, Melissa J.
2008-01-01
We report the results of a national survey conducted to help public health officials understand the public’s response to community mitigation interventions for a severe outbreak of pandemic influenza. Survey results suggest that if community mitigation measures are instituted, most respondents would comply with recommendations but would be challenged to do so if their income or job were severely compromised. The results also indicate that community mitigation measures could cause problems for persons with lower incomes and for racial and ethnic minorities. Twenty-four percent of respondents said that they would not have anyone available to take care of them if they became sick with pandemic influenza. Given these results, planning and public engagement will be needed to encourage the public to be prepared. PMID:18439361
Tiered on-the-ground implementation projects for Gulf of Mexico water quality improvements
USDA-ARS?s Scientific Manuscript database
Both the Gulf Hypoxia Action Plan for Reducing, Mitigating, and Controlling Hypoxia in the Northern Gulf of Mexico and Improving Water Quality in the Mississippi River Basin (USEPA 2008) and the GOMA Governors’ Action Plan II for Healthy and Resilient Coasts (GOMA 2009) call for the development and ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-18
...-FXES11120800000F2-123-F2] Proposed Low-Effect Habitat Conservation Plan for the California Tiger Salamander... animal, the threatened Central California Distinct Population Segment of the California tiger salamander (tiger salamander). The applicant would implement a conservation program to minimize and mitigate the...
Code of Federal Regulations, 2012 CFR
2012-10-01
... procedures have been followed, and (3) The land management agency is willing to assume long-term... appropriations. The Commission will provide the Secretary's Representative with both long range and annual... plan in terms of meeting Section 8 mitigation obligations as directed by the Act. (iv) The Commission...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-19
..., management, maintenance, and monitoring of conservation lands used to mitigate the effects of the other.... The LOHCP is a comprehensive plan designed to provide long-term conservation and management of... Maintenance: Public and private utility company activities to operate and maintain, including repair and...
Messy Design: Organic Planning for Blended Learning
ERIC Educational Resources Information Center
Rankin, Andrea; Luzeckyj, Ann; Haggis, Jane; Gare, Callum
2016-01-01
In this paper we argue that a messy design process does not mitigate against sharing and transfer of artefacts across educational domains. In fact, such a process can aid in developing a model for learning and teaching that is reusable and authentic. We describe the planning and design of an integrated and interactive blended learning environment…
40 CFR Appendix F to Part 112 - Facility-Specific Response Plan
Code of Federal Regulations, 2012 CFR
2012-07-01
... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...
40 CFR Appendix F to Part 112 - Facility-Specific Response Plan
Code of Federal Regulations, 2013 CFR
2013-07-01
... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...
National Infrastructure Protection Plan: Partnering to Enhance Protection and Resiliency
ERIC Educational Resources Information Center
US Department of Homeland Security, 2009
2009-01-01
The overarching goal of the National Infrastructure Protection Plan (NIPP) is to build a safer, more secure, and more resilient America by preventing, deterring, neutralizing, or mitigating the effects of deliberate efforts by terrorists to destroy, incapacitate, or exploit elements of our Nation's critical infrastructure and key resources (CIKR)…
The Effect of Mitigation Policy on Regional Climate Impacts on the U.S. Electric Sector
NASA Astrophysics Data System (ADS)
Cohen, S. M.; Sun, Y.; Strzepek, K.; McFarland, J.; Boehlert, B.; Fant, C.
2017-12-01
Climate change can influence the U.S. electricity sector in many ways, the nature of which can be shaped by energy and environmental policy choices. Changing temperatures affect electricity demand largely through heating and cooling needs, and temperatures also affect generation and transmission system performance. Altered precipitation patterns affect the regional and seasonal distribution of surface water runoff, which changes hydropower operation and thermal cooling water availability. The extent to which these stimuli influence U.S. power sector operation and planning will depend to some extent on whether or not proactive policies are enacted to mitigate these impacts. Mitigation policies such as CO2 emissions limits or technology restrictions can change the makeup of the electricity system while reducing the extent of climate change itself. We use the National Renewable Energy Laboratory's Regional Energy Deployment System (ReEDS), a U.S. electric sector capacity expansion model, to explore electric sector evolution through 2050 under alternative climate and policy assumptions. The model endogenously represents climate impacts on load, power system performance, cooling water availability, and hydropower, allowing internally consistent system responses to climate change along with projected technology, market, and policy conditions. We compare climate impacts across 5 global circulation models for a 8.5 W/m2 representative concentration pathway (RCP) without a climate mitigation policy and a 4.5 W/m2 RCP with climate mitigation. Climate drivers affect the capacity and generation mix at the national and regional levels, with relative growth of wind, solar, and natural gas-based technologies depending on local electricity system characteristics. These differences affect regional economic impacts, measured here as changes to electricity price and system costs. Mitigation policy reduces the economic and system impacts of climate change largely by moderating temperature-induced load but also by lessening water- and temperature-based performance constraints. Policy impacts are nuanced and region-specific, and this analysis underscores the importance of climate mitigation policy to regional electricity system planning decisions.
ERIC Educational Resources Information Center
Maxwell, B. L.
1972-01-01
Compensatory Education at its best is merely iodine being used to cure cancer. The problems of America's social, political, and educational systems are far too mammoth to be placated by this feeble effort. (Author)