Sample records for plan identifies technical

  1. Supplement to a Methodology for Succession Planning for Technical Experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirk, Bernadette Lugue; Cain, Ronald A.; Agreda, Carla L.

    This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a draft methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, and the methodology is tested through interviews with selected subject matter experts.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.

    The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less

  3. Field Test of the Methodology for Succession Planning for Technical Experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cain, Ronald A.; Kirk, Bernadette Lugue; Agreda, Carla L.

    This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, hereafter referred to as “core competencies”. The methodology has been field tested by interviewing selected retiring subject matter experts (SMEs).

  4. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  5. 77 FR 41132 - Air Quality Implementation Plans; Alabama; Attainment Plan for the Alabama Portion of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-12

    ... modeling demonstration should include supporting technical analyses and descriptions of all relevant....5 and NO X . The attainment demonstration includes: Technical analyses that locate, identify, and... modeling analysis is a complex technical evaluation that began with selection of the modeling system. The...

  6. Navigation: National Plans; NAVSTAR-GPS; Laser Gyros

    DTIC Science & Technology

    1982-08-31

    REFERENC-~CP STER . TECHNICAL REPORT ! "NO. 12686,-’-. - NAVIGATION: NATIONAL PLANS ; NAVSTAR-GPS; LASER GYROS CONTRACT NO. DAAK30-80-C-0073 31 AUGUST...Technical ReportAW Ng. riiNational Plans ; Navstar-GPS; S... : NavstarGPS; a3 Sept 1980 - 31 Aug 1982 ....Lasr Gyros. 6. PERFORMING ORG. REPORT NUMBER PRA...identify by block number) Navigation Navigation Satellites Laser Gyros Position-Location . NAVSTAR-GPS Fiberoptic Gyros Planning Global Positioning System

  7. Technology in education: A guidebook for developing a science and math education support program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, C.L.

    1992-09-01

    Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization's strengths and resources with the needs of the school system. Following these getting started'' activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less

  8. Technology in education: A guidebook for developing a science and math education support program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, C.L.

    1992-09-01

    Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization`s strengths and resources with the needs of the school system. Following these ``getting started`` activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less

  9. Low Impact Development Master Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loftin, Samuel R.

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  10. TADS Needs Assessment Procedures Manual, Summer 1980.

    ERIC Educational Resources Information Center

    Black, Talbot; And Others

    The TADS (Technical Assistance Development System) Needs Assessment Manual is designed to guide the comprehensive review of Handicapped Children's Early Education Program (HCEEP) demonstration projects in identifying technical assistance needs. An introduction reviews the TADS technical assistance model which includes program planning, needs…

  11. Louisiana Airport System Plan.

    DOT National Transportation Integrated Search

    1992-10-01

    This report is a non-technical summary of the update to the Louisiana Airport System Plan. The system plan identifies the location, service level, and role of the 81 airports included in the plan and the costs to develop individual airports and the a...

  12. 40 CFR 35.4190 - How does my group identify a qualified technical advisor?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... health, environmental sciences, engineering, environmental law and planning); and (3) Ability to... 40 Protection of Environment 1 2013-07-01 2013-07-01 false How does my group identify a qualified technical advisor? 35.4190 Section 35.4190 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS...

  13. 40 CFR 35.4190 - How does my group identify a qualified technical advisor?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... health, environmental sciences, engineering, environmental law and planning); and (3) Ability to... 40 Protection of Environment 1 2014-07-01 2014-07-01 false How does my group identify a qualified technical advisor? 35.4190 Section 35.4190 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS...

  14. 40 CFR 35.4190 - How does my group identify a qualified technical advisor?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... health, environmental sciences, engineering, environmental law and planning); and (3) Ability to... 40 Protection of Environment 1 2012-07-01 2012-07-01 false How does my group identify a qualified technical advisor? 35.4190 Section 35.4190 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS...

  15. 13 CFR 313.5 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical assistance to: (1) Diversify and strengthen the economy in the Impacted Community; (2) Identify...; and (3) Develop or update a Strategic Plan in accordance with § 313.6 to address economic adjustment...

  16. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  17. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  18. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, A.G.

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  19. Identifying and Planning for New and Emerging Occupations: A Suggested Guide.

    ERIC Educational Resources Information Center

    Meleen, Paulette; And Others

    Intended for use by State vocational education directors and curriculum planners, this guide documents the results of a project which developed and applied a process for identifying new and emerging occupations for skilled and technical areas, part of a larger effort to assist the alignment of vocational and technical program offerings with new…

  20. Alternative sample sizes for verification dose experiments and dose audits

    NASA Astrophysics Data System (ADS)

    Taylor, W. A.; Hansen, J. M.

    1999-01-01

    ISO 11137 (1995), "Sterilization of Health Care Products—Requirements for Validation and Routine Control—Radiation Sterilization", provides sampling plans for performing initial verification dose experiments and quarterly dose audits. Alternative sampling plans are presented which provide equivalent protection. These sampling plans can significantly reduce the cost of testing. These alternative sampling plans have been included in a draft ISO Technical Report (type 2). This paper examines the rational behind the proposed alternative sampling plans. The protection provided by the current verification and audit sampling plans is first examined. Then methods for identifying equivalent plans are highlighted. Finally, methods for comparing the cost associated with the different plans are provided. This paper includes additional guidance for selecting between the original and alternative sampling plans not included in the technical report.

  1. Succession planning for technical experts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirk, Bernadette Lugue; Cain, Ronald A.; Dewji, Shaheen A.

    This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclearmore » power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.« less

  2. RESEARCH AND DEVELOPMENT PRIORITIES IN TECHNICAL EDUCATION, A REPORT OF A NATIONAL RESEARCH PLANNING CONFERENCE IN TECHNICAL EDUCATION (THE OHIO STATE UNIVERSITY, JANUARY 10-11, 1967).

    ERIC Educational Resources Information Center

    MILLER, AARON J.

    A SELECT GROUP OF PARTICIPANTS REPRESENTING NATIONAL LEADERSHIP IN BUSINESS, INDUSTRY, RESEARCH, GOVERNMENT, AND EDUCATION MET TO IDENTIFY SOME OF THE MOST OBVIOUS NEW EMERGING TECHNICAL OCCUPATIONS WHICH MIGHT REQUIRE RESEARCH AND DEVELOPMENT EFFORTS AND SOME OF THE MOST PRESSING RESEARCHABLE PROBLEM AREAS IN TECHNICAL EDUCATION. THE NEW OR…

  3. Louisiana ITS business plan : technical summary.

    DOT National Transportation Integrated Search

    2000-03-01

    The objectives are defined under: 1. Development of the plan, which identifies the preferred program of projects and policy initiatives and outlines the purpose, requirements, responsibilities, estimated cost, and implementation schedule for each pla...

  4. Using case studies to teach an engineering technology technical writing class

    NASA Technical Reports Server (NTRS)

    Green, M. M.

    1981-01-01

    The use of the case method in teaching various technical communication skills is described. Features of the method considered include: solving communication problems, identifying an audience, planning written communications, presenting written communications, and using visual aids.

  5. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less

  6. Implementing PlanCheyenne: Strategies and Opportunities for Smarter Growth in Cheyenne

    EPA Pesticide Factsheets

    This report is from a technical assistance project with Cheyenne, WY, to identify policy options that would implement PlanCheyenne and illustrate development that would help to achieve the community's goals.

  7. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  8. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less

  9. [Preventing maternal and child malnutrition: the nutrition component of the Mesoamerican Health Initiative 2015].

    PubMed

    Rivera, Juan A; Martorell, Reynaldo; González, Wendy; Lutter, Chessa; Cossío, Teresa González de; Flores-Ayala, Rafael; Uauy, Ricardo; Delgado, Hernán

    2011-01-01

    To describe the regional master plan of nutrition to address maternal and child malnutrition in a 5- year period developed by the Nutrition Technical Group. The Nutrition Technical Group developed a situation analysis describing the main nutrition problems, policies and programs in Mesoamerica. The situation analysis and a literature review about effective interventions to address malnutrition were conducted to develop a nutrition master plan. The Nutrition Technical Group held various meetings to develop, discuss and validate the master plan. Theory of change identified problems and barriers, the actions to be developed, the changes and impacts expected. A package of interventions is proposed to reduce undernutrition and micronutrient deficiencies useful under different epidemiological contexts. The nutrition master plan provides a guideline of best practices that can be used for evidence-informed decision making and the development of national policies and programs to reduce malnutrition.

  10. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... response plan is completed. FEMA and other Federal agencies will participate in training, exercises, and drills, in support of the licensee offsite emergency response plan. (e) In carrying out paragraphs (a.... This information will identify Federal agencies which are to be included in the plan, the extent and...

  11. Technical Note: Millimeter precision in ultrasound based patient positioning: Experimental quantification of inherent technical limitations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ballhausen, Hendrik, E-mail: hendrik.ballhausen@med.uni-muenchen.de; Hieber, Sheila; Li, Minglun

    2014-08-15

    Purpose: To identify the relevant technical sources of error of a system based on three-dimensional ultrasound (3D US) for patient positioning in external beam radiotherapy. To quantify these sources of error in a controlled laboratory setting. To estimate the resulting end-to-end geometric precision of the intramodality protocol. Methods: Two identical free-hand 3D US systems at both the planning-CT and the treatment room were calibrated to the laboratory frame of reference. Every step of the calibration chain was repeated multiple times to estimate its contribution to overall systematic and random error. Optimal margins were computed given the identified and quantified systematicmore » and random errors. Results: In descending order of magnitude, the identified and quantified sources of error were: alignment of calibration phantom to laser marks 0.78 mm, alignment of lasers in treatment vs planning room 0.51 mm, calibration and tracking of 3D US probe 0.49 mm, alignment of stereoscopic infrared camera to calibration phantom 0.03 mm. Under ideal laboratory conditions, these errors are expected to limit ultrasound-based positioning to an accuracy of 1.05 mm radially. Conclusions: The investigated 3D ultrasound system achieves an intramodal accuracy of about 1 mm radially in a controlled laboratory setting. The identified systematic and random errors require an optimal clinical tumor volume to planning target volume margin of about 3 mm. These inherent technical limitations do not prevent clinical use, including hypofractionation or stereotactic body radiation therapy.« less

  12. Word Processing for Technical Writers and Teachers.

    ERIC Educational Resources Information Center

    Mullins, Carolyn J.; West, Thomas W.

    This discussion of the computing network and word processing facilities available to professionals on the Indiana University campuses identifies the word and text processing needs of technical writers and faculty, describes the current computing network, and outlines both long- and short-range objectives, policies, and plans for meeting these…

  13. A Technical/Strategic Paradigm for Online Executive Education

    ERIC Educational Resources Information Center

    Smith, Marlene A.; Keaveney, Susan M.

    2017-01-01

    This article discusses the development and delivery of online courses for the executive education audience. The goal is to introduce a new framework, the technical/strategic paradigm, that will help educators to identify the pedagogical needs of disparate executive groups and adjust their online course development plans accordingly. We describe…

  14. A planning approach for agricultural watersheds using precision conservation

    USDA-ARS?s Scientific Manuscript database

    This brief article, written for a non-technical audience, discusses a recently-developed approach for watershed planning and nutrient reduction. The approach can help local stakeholders identify conservation practices that are locally preferred and determine how those practices can be distributed ac...

  15. Pediatric Chest Pain-Low-Probability Referral: A Multi-Institutional Analysis From Standardized Clinical Assessment and Management Plans (SCAMPs®), the Pediatric Health Information Systems Database, and the National Ambulatory Medical Care Survey.

    PubMed

    Harahsheh, Ashraf S; O'Byrne, Michael L; Pastor, Bill; Graham, Dionne A; Fulton, David R

    2017-11-01

    We conducted a study to assess test characteristics of red-flag criteria for identifying cardiac disease causing chest pain and technical charges of low-probability referrals. Accuracy of red-flag criteria was ascertained through study of chest pain Standardized Clinical Assessment and Management Plans (SCAMPs®) data. Patients were divided into 2 groups: Group1 (concerning clinical elements) and Group2 (without). We compared incidence of cardiac disease causing chest pain between these 2 groups. Technical charges of Group 2 were analyzed using the Pediatric Health Information System database. Potential savings for the US population was estimated using National Ambulatory Medical Care Survey data. Fifty-two percent of subjects formed Group 1. Cardiac disease causing chest pain was identified in 8/1656 (0.48%). No heart disease was identified in patients in Group 2 ( P = .03). Applying red-flags in determining need for referral identified patients with cardiac disease causing chest pain with 100% sensitivity. Median technical charges for Group 2, over a 4-year period, were US2014$775 559. Eliminating cardiac testing of low-probability referrals would save US2014$3 775 182 in technical charges annually. Red-flag criteria were an effective screen for children with chest pain. Eliminating cardiac testing in children without red-flags for referral has significant technical charge savings.

  16. 77 FR 21993 - Endangered and Threatened Wildlife and Plants; Notice of Availability of a Technical/Agency Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ... encompassed all major rivers in the Mobile Basin, including the Alabama, Tombigbee, and Cahaba River systems... plans. Recovery Plan Components The objective of this plan is to provide a framework for the recovery of... Before including your address, phone number, email address, or other personal identifying information in...

  17. Statewide Invitational Conference on Curriculum Development in Vocational-Technical Education (Chapel Hill, Tennessee, March 1-3, 1971).

    ERIC Educational Resources Information Center

    Tennessee Univ., Knoxville. Occupational Research and Development Coordinating Unit.

    Over 50 educational leaders representing academic and vocational-technical interests met for a 3-day conference to identify curriculum needs and techniques used in curriculum development and to suggest curriculum priorities and coordinated projected plans to attain recommended goals. Conference objectives were accomplished through small group…

  18. SURVEY OF INFORMATION ON VOCATIONAL AND TECHNICAL EDUCATION IN THE STATE OF ILLINOIS. FINAL REPORT.

    ERIC Educational Resources Information Center

    Corplan Associates, Chicago, IL. Technology Center.

    THE BASIC OBJECTIVE OF THE SURVEY WAS TO GATHER INFORMATION HELPFUL IN PLANNING AND DEVELOPING VOCATIONAL AND TECHNICAL EDUCATION PRIMARILY WITHIN THE PUBLIC SCHOOL SYSTEM. OCCUPATIONAL NEEDS WERE IDENTIFIED FROM FORECASTS OF CHANGES IN CURRENT OCCUPATIONS, AN ANALYSIS OF THE IMPLICATIONS OF SCIENTIFIC AND TECHNOLOGICAL DEVELOPMENTS, AND…

  19. DOE-AVCP Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Latham, Brent

    The purpose of the Cooperative Agreement was based on the mission the two agencies have in common. The Association of Village Council Presidents (AVCP) has been a critical player in accomplishing what Alaskan Native communities need since 1964 with various programs including energy assistance. The AVCP/DOE Partnership enabled AVCP to assist 10 of 56 remote Alaska Native villages in the development of a community-led Community Energy Plan. These plans have empowered the 10 Tribes to address their own energy development needs. The community energy plans that AVCP assisted the communities with identified the community’s energy vision, goals, and a highmore » level project timeline of each goal. The plans also include the technical potential, resource assessment, grant and technical assistance resources. The AVCP/DOE Partnership also enabled AVCP to provide tribal leaders and staff from the 56 Federally-Recognized Tribes with information about the policies and programs of the Department, support regional workshops and forums, and provide directed technical assistance for initial energy project support.« less

  20. Building and measuring infrastructure and capacity for community health assessment and health improvement planning in Florida.

    PubMed

    Abarca, Christine; Grigg, C Meade; Steele, Jo Ann; Osgood, Laurie; Keating, Heidi

    2009-01-01

    COMPASS (Comprehensive Assessment, Strategic Success) is the Florida Department of Health's community health assessment and health improvement planning initiative. Since 2002, COMPASS built state and county health department infrastructure to support a comprehensive, systematic, and integrated approach to community health assessment and planning. To assess the capacity of Florida's 67 county health departments (CHDs) to conduct community health assessment and planning and to identify training and technical assistance needs, COMPASS surveyed the CHDs using a Web-based instrument annually from 2004 through 2008. Response rate to the survey was 100 percent annually. In 2007, 96 percent of CHDs reported conducting assessment and planning within the past 3 years; 74 percent used the MAPP (Mobilizing for Action through Planning and Partnerships) framework. Progress was greater for the organizational and assessment phases of the MAPP-based work; only 10 CHDs had identified strategic priorities in 2007, and even fewer had implemented strategies for improving health. In 2007, the most frequently requested types of training were measuring success, developing goals and action plans, and using qualitative data; technical assistance was most frequently requested for program evaluation and writing community health status reports. Florida's CHDs have increased their capacity to conduct community health assessment and planning. Questions remain about sustaining these gains with limited resources.

  1. Identifying Professional Development Needs in Mathematics: A Planning Tool for Grades 3-7. Second Edition

    ERIC Educational Resources Information Center

    Taylor, Mary Jo; Dimino, Joseph A.; Gellar, Leanne Ketterlin; Koontz, Trish

    2010-01-01

    This document offers a planning tool for grades 3-7 that can be used by regional comprehensive centers, other technical assistance centers, and state departments of education to plan professional development for teachers. It is based on the "National Mathematics Advisory Panel Report" which was published in 2008. The panel synthesized its final…

  2. Virtual Preoperative Planning and Intraoperative Navigation in Facial Prosthetic Reconstruction: A Technical Note.

    PubMed

    Verma, Suzanne; Gonzalez, Marianela; Schow, Sterling R; Triplett, R Gilbert

    This technical protocol outlines the use of computer-assisted image-guided technology for the preoperative planning and intraoperative procedures involved in implant-retained facial prosthetic treatment. A contributing factor for a successful prosthetic restoration is accurate preoperative planning to identify prosthetically driven implant locations that maximize bone contact and enhance cosmetic outcomes. Navigational systems virtually transfer precise digital planning into the operative field for placing implants to support prosthetic restorations. In this protocol, there is no need to construct a physical, and sometimes inaccurate, surgical guide. The report addresses treatment workflow, radiologic data specifications, and special considerations in data acquisition, virtual preoperative planning, and intraoperative navigation for the prosthetic reconstruction of unilateral, bilateral, and midface defects. Utilization of this protocol for the planning and surgical placement of craniofacial bone-anchored implants allows positioning of implants to be prosthetically driven, accurate, precise, and efficient, and leads to a more predictable treatment outcome.

  3. Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence, B.

    2001-04-30

    The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  4. Strategic plan for science-U.S. Geological Survey, Ohio Water Science Center, 2010-15

    USGS Publications Warehouse

    ,

    2010-01-01

    This Science Plan identifies specific scientific and technical programmatic issues of current importance to Ohio and the Nation. An examination of those issues yielded a set of five major focus areas with associated science goals and strategies that the Ohio Water Science Center will emphasize in its program during 2010-15. A primary goal of the Science Plan is to establish a relevant multidisciplinary scientific and technical program that generates high-quality products that meet or exceed the expectations of our partners while supporting the goals and initiatives of the U.S. Geological Survey. The Science Plan will be used to set the direction of new and existing programs and will influence future training and hiring decisions by the Ohio Water Science Center.

  5. Technical Potential Assessment for the Renewable Energy Zone (REZ) Process: A GIS-Based Approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Nathan; Roberts, Billy J

    Geographic Information Systems (GIS)-based energy resource and technical potential assessments identify areas capable of supporting high levels of renewable energy (RE) development as part of a Renewable Energy Zone (REZ) Transmission Planning process. This document expands on the REZ Process to aid practitioners in conducting GIS-based RE resource and technical potential assessments. The REZ process is an approach to plan, approve, and build transmission infrastructure that connects REZs - geographic areas that have high-quality RE resources, suitable topography and land-use designations, and demonstrated developer interest - to the power system. The REZ process helps to increase the share of solarmore » photovoltaic (PV), wind, and other resources while also maintaining reliability and economics.« less

  6. Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramuhalli, Pradeep; Devanathan, Ram; Meyer, Ryan M.

    As U.S. nuclear power plants look to subsequent license renewal (SLR) to operate for a 20-year period beyond 60 years, the U.S. Nuclear Regulatory Commission and the industry will be addressing technical issues around the capability of long-lived passive components to meet their functionality objectives. A key challenge will be to better understand likely materials degradation mechanisms in these components and their impacts on component functionality and margins to safety. Research addressing many of the remaining technical gaps in these areas for SLR may greatly benefit from materials sampled from plants (decommissioned or operating). Because of the cost and inefficiencymore » of piecemeal sampling, there is a need for a strategic and systematic approach to sampling materials from structures, systems, and components (SSC) in both operating and decommissioned plants. This document describes a potential approach for sampling (harvesting) materials that focuses on prioritizing materials for sampling using a number of criteria. These criteria are based on an evaluation of technical gaps identified in the literature, research needs to address these technical gaps, and lessons learned from previous harvesting campaigns. The document also describes a process for planning future harvesting campaigns; such a plan would include an understanding of the harvesting priorities, available materials, and the planned use of the materials to address the technical gaps.« less

  7. SERC 2014 2018 Technical Plan: 2016 Update

    DTIC Science & Technology

    2016-02-18

    Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update SERC 2014-2018 Technical Plan: 2016 Update...UNCLASSIFIED / APPROVED FOR PUBLIC RELEASE Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update ii...18, 2016 SERC 2014-2018 Technical Plan Update iii TABLE OF CONTENTS Table of Contents

  8. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less

  9. Modular space station phase B extension program master plan

    NASA Technical Reports Server (NTRS)

    Munsey, E. H.

    1971-01-01

    The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

  10. 78 FR 45934 - The National Institute of Dental and Craniofacial Research (NIDCR) Strategic Plan Request for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... a new strategic plan to guide the Institute's research efforts and priorities over the next six... areas identified below. (1) ``Transformative'' areas of research where new discoveries could have the greatest benefit for advancing dental, oral, and craniofacial research. (2) New technical capabilities or...

  11. Bell Canada Training for Future

    ERIC Educational Resources Information Center

    Blake, Frank

    1973-01-01

    Bell Canada's plans for future training will be on a centralized basis, using specialists in instructional technology to identify training needs and design courses at both the technical and managerial levels. (DS)

  12. Advanced Risk Reduction Tool (ARRT) Special Case Study Report: Science and Engineering Technical Assessments (SETA) Program

    NASA Technical Reports Server (NTRS)

    Kirsch, Paul J.; Hayes, Jane; Zelinski, Lillian

    2000-01-01

    This special case study report presents the Science and Engineering Technical Assessments (SETA) team's findings for exploring the correlation between the underlying models of Advanced Risk Reduction Tool (ARRT) relative to how it identifies, estimates, and integrates Independent Verification & Validation (IV&V) activities. The special case study was conducted under the provisions of SETA Contract Task Order (CTO) 15 and the approved technical approach documented in the CTO-15 Modification #1 Task Project Plan.

  13. Project Manager’s Guide to the Scientific and Technical Information (STINFO) Program and Technical Publications Process

    DTIC Science & Technology

    1993-12-01

    Iaporta .. y be definitive for the tubjoct proaentod, exploratory in natura, or an evaluation of critical Aubayato• or of technical problema , 4...International Security 9 Social and Natural Science Studies Field 41 Edit: (Type 3) -Entry of an invalid code when Performance Type is "C" or "M" will...analysis SF Foreign area social science research SP Foreign area policy planAing research BF Identifies databases with data on foreign forces or

  14. Important Non-Technical Skills in Video-Assisted Thoracoscopic Surgery Lobectomy: Team Perspectives.

    PubMed

    Gjeraa, Kirsten; Mundt, Anna S; Spanager, Lene; Hansen, Henrik J; Konge, Lars; Petersen, René H; Østergaard, Doris

    2017-07-01

    Safety in the operating room is dependent on the team's non-technical skills. The importance of non-technical skills appears to be different for minimally invasive surgery as compared with open surgery. The aim of this study was to identify which non-technical skills are perceived by team members to be most important for patient safety, in the setting of video-assisted thoracoscopic surgery (VATS) lobectomy. This was an explorative, semistructured interview-based study with 21 participants from all four thoracic surgery centers in Denmark that perform VATS lobectomy. Data analysis was deductive, and directed content analysis was used to code the text into the Oxford Non-Technical Skills system for evaluating operating teams' non-technical skills. The most important non-technical skills described by the VATS teams were planning and preparation, situation awareness, problem solving, leadership, risk assessment, and teamwork. These non-technical skills enabled the team to achieve shared mental models, which in turn facilitated their efforts to anticipate next steps. This was viewed as important by the participants as they saw VATS lobectomy as a high-risk procedure with complementary and overlapping scopes of practice between surgical and anesthesia subteams. This study identified six non-technical skills that serve as the foundation for shared mental models of the patient, the current situation, and team resources. These findings contribute three important additions to the shared mental model construct: planning and preparation, risk assessment, and leadership. Shared mental models are crucial for patient safety because they enable VATS teams to anticipate problems through adaptive patterns of both implicit and explicit coordination. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  15. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgard, K.G.

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less

  16. Design for effective development and prototyping of the HL-20

    NASA Astrophysics Data System (ADS)

    Urie, David M.; Floreck, Paul A.; McMorris, John A.; Elvin, John D.

    1993-10-01

    A feasibility study of the HL-20 personnel launch system (PLS) concept was conducted by a team which focused on creating a PLS design approach and an accelerated development plan consistent with the historical 'Skunk Works' approach to rapid prototyping. Technical design, manufacturing, system testing, and operations and support elements of the predefined baseline concept were evaluated. An initial phase program, featuring a concurrent system test during design and development, leading to the orbital flight of an unmanned HL-20 prototype on a Titan III launch system, was prescribed. A second-phase development and manufacturing plan leading to system operational status was also formulated. Baseline design feature modifications were made when necessary, without compromise to performance, to satisfy the prototype development plan. Technical design details and off-the-shelf hardware candidates were also identified for several subsystems, including the launch-system interface adapter/emergency escape system. The technical feasibility of the system and applicability of the Skunk Works approach to development of the HL-20/PLS were verified.

  17. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne; Honma, George

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less

  18. Metals and Ceramics Information Center.

    DTIC Science & Technology

    1981-07-01

    Systems RESOURCE MANAGEMENT AND ECONOMIC ANALYSIS a Ordnance Technology a Space Systems and Applications a Biomass Resources 6 Business Planning • Economics ...r 19 KEY WORDS (Cwintince on reverse side 4 neressery and identify by block numnber) Technical Information Center Composites DoD Information Analysis ...The Metals and Ceramics Information Center (MCIC) is one of the technical Information Analysis Centers (IAC’s) chartered and sponsored by the

  19. PISA for Development Technical Strand A: Enhancement of PISA Cognitive Instruments. OECD Education Working Papers, No. 126

    ERIC Educational Resources Information Center

    Adams, Ray; Cresswell, John

    2016-01-01

    The OECD is planning to enhance existing PISA assessment instruments in reading, mathematics and science so that they will be more suitable to the context of developing countries. The main purpose of this paper is to identify the main technical issues associated with this aim. The paper reports detailed analysis of the existing PISA item pool and…

  20. Tank waste remediation system privatization infrastructure program, configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

  1. Rice scene radiation research plan

    NASA Technical Reports Server (NTRS)

    Heilman, J.

    1982-01-01

    Data requirements, tasks to be accomplished, and the technical approaches to be used in identifying the characteristics of rice for crop inventories are listed as well as methods for estimating crop development and assessing its conditions.

  2. Site characterization report for the basalt waste isolation project. Volume II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-11-01

    The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987,more » and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 2 contains chapters 6 through 12: geochemistry; surface hydrology; climatology, meteorology, and air quality; environmental, land-use, and socioeconomic characteristics; repository design; waste package; and performance assessment.« less

  3. Advanced transportation system studies, technical area 3. Alternate propulsion subsystem concepts: J-2S restart study

    NASA Astrophysics Data System (ADS)

    Vilja, John; Levack, Daniel

    1993-04-01

    The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.

  4. Louisiana CVO/ITS business plan : technical summary.

    DOT National Transportation Integrated Search

    1998-06-01

    Louisiana seeks to improve the efficiency and effectiveness of CVO business and operational functions in the state. This overall mission includes three discrete elements designed to address priority needs as identified by state and industry stakehold...

  5. Proceedings IUFRO: Evaluation and planning of forestry research. International Union of Forestry Research Organizations (S6.O6-S6.O6.Ol)

    Treesearch

    Denver P. Burns

    1986-01-01

    Contains 23 papers presented in six technical sessions on forestry research management planning and evaluation. Primary topics focus on nontraditional views and sources of information and emerging technologies affecting forestry research; methods for identifying research needs and strategies required for implementation; and research evaluation at the individual,...

  6. Report of the National Research Conference on Consumer and Homemaking Education (Columbus, Ohio, June 2-5, 1970). Leadership Training Series No. 31.

    ERIC Educational Resources Information Center

    Gorman, Anna M.

    To determine priorities for critical problems facing consumer and homemaking education and plan research projects which focus on these critical problems, a 5-day conference was attended by 107 vocational-technical education specialists and educators. Conference sessions were planned to (1) identify critical research problem areas and prepare a…

  7. Energy-Related Technology Programs in Community and Junior Colleges: An Analysis of Existing and Planned Programs.

    ERIC Educational Resources Information Center

    Doggette, John R.

    This study was conducted to provide a basis for planning for needed energy-related occupational technology programs in two-year educational institutions. A questionnaire was sent to 1,152 junior, community, and technical colleges in fall 1975; 774 (67%) responded. The survey identified 62 existing one- and two-year energy-related programs and 132…

  8. Aquatic Ecosystem Enhancement at Mountaintop Mining Sites Symposium

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, D. Courtney; Lawson, Peter; Morgan, John

    2000-01-12

    Welcome to this symposium which is part of the ongoing effort to prepare an Environmental Impact Statement (EIS) regarding mountaintop mining and valley fills. The EIS is being prepared by the U.S. Environmental Protection Agency, U.S. Army Corps of Engineers, U.S. Office of Surface Mining, and U.S. Fish and Wildlife Service, in cooperation with the State of West Virginia. Aquatic Ecosystem Enhancement (AEE) at mountaintop mining sites is one of fourteen technical areas identified for study by the EIS Interagency Steering Committee. Three goals were identified in the AEE Work Plan: 1. Assess mining and reclamation practices to show howmore » mining operations might be carried out in a way that minimizes adverse impacts to streams and other environmental resources and to local communities. Clarify economic and technical constraints and benefits. 2. Help citizens clarify choices by showing whether there are affordable ways to enhance existing mining, reclamation, mitigation processes and/or procedures. 3. Ide identify data needed to improve environmental evaluation and design of mining projects to protect the environment. Today’s symposium was proposed in the AEE Team Work Plans but coordinated planning for the event began September 15, 1999 when representatives from coal industry, environmental groups and government regulators met in Morgantown. The meeting participants worked with a facilitator from the Canaan Valley Institute to outline plans for the symposium. Several teams were formed to carry out the plans we outlined in the meeting.« less

  9. Underground Test Area Activity Preemptive Review Guidance Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene; Rehfeldt, Kenneth

    Preemptive reviews (PERs) of Underground Test Area (UGTA) Activity corrective action unit (CAU) studies are an important and long-maintained quality improvement process. The CAU-specific PER committees provide internal technical review of ongoing work throughout the CAU lifecycle. The reviews, identified in the UGTA Quality Assurance Plan (QAP) (Sections 1.3.5.1 and 3.2), assure work is comprehensive, accurate, in keeping with the state of the art, and consistent with CAU goals. PER committees review various products, including data, documents, software/codes, analyses, and models. PER committees may also review technical briefings including Federal Facility Agreement and Consent Order (FFACO)-required presentations to the Nevadamore » Division of Environmental Protection (NDEP) and presentations supporting key technical decisions (e.g., investigation plans and approaches). PER committees provide technical recommendations to support regulatory decisions that are the responsibility of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and NDEP.« less

  10. An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

    NASA Technical Reports Server (NTRS)

    Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.

    1987-01-01

    The authors describe a two-phase approach to allotment planning suitable for use in planning the fixed satellite service at the 1988 Space World Administrative radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common to groups of administrations and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the conference. Computer software has been developed to implement the concepts, and the logic and rationale for identifying predetermined arc segments is discussed. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

  11. Architecture of high-rise buildings as a brand of the modern Kazakhstan

    NASA Astrophysics Data System (ADS)

    Abdrassilova, Gulnara; Kozbagarova, Nina; Tuyakayeva, Ainagul

    2018-03-01

    Using practical examples article reviews urban-planning and space-planning features of design and construction of high-rise buildings in Kazakhstan conditions; methods are identified that provide for structural stability against wind and seismic loads based on innovative technical and technological solutions. Article authors stress out the fashion function of high-rise buildings in the new capital of Kazakhstan, the Astana city.

  12. Fly-by-light flight control system technology development plan

    NASA Technical Reports Server (NTRS)

    Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.

    1990-01-01

    The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

  13. Synthesis of port related freight improvement studies : technical report.

    DOT National Transportation Integrated Search

    2012-10-01

    This project was undertaken to assist in identifying landside transportation projects that will better position : the state of Texas to benefit from the expansion of the Panama Canal through increases in exports and : imports. Studies and plans over ...

  14. The Conservation Reserve Program: Planting for the future

    USGS Publications Warehouse

    Hyberg, Skip; Allen, Arthur

    2006-01-01

    Proceedings are now available from a scientific and technical forum held to review ongoing and planned research, identify lessons learned, and determine future research needs for the purpose of developing a rigorous scientific basis for future CRP policy discussions.

  15. 76 FR 20347 - Release of Draft Integrated Review Plan for the National Ambient Air Quality Standards for Lead

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for... rulemaking by docket number and other identifying information (subject heading, Federal Register date and... phase for the review. This phase began with a science policy workshop to identify issues and questions...

  16. An allotment planning concept and related computer software for planning the fixed satellite service at the 1988 space WARC

    NASA Technical Reports Server (NTRS)

    Miller, Edward F.; Heyward, Ann O.; Ponchak, Denise S.; Spence, Rodney L.; Whyte, Wayne A., Jr.; Zuzek, John E.

    1987-01-01

    Described is a two-phase approach to allotment planning suitable for use in establishing the fixed satellite service at the 1988 Space World Administrative Radio Conference (ORB-88). The two phases are (1) the identification of predetermined geostationary arc segments common togroups of administrations, and (2) the use of a synthesis program to identify example scenarios of space station placements. The planning approach is described in detail and is related to the objectives of the confernece. Computer software has been developed to implement the concepts, and a complete discussion on the logic and rationale for identifying predetermined arc segments is given. Example scenarios are evaluated to give guidance in the selection of the technical characteristics of space communications systems to be planned. The allotment planning concept described guarantees in practice equitable access to the geostationary orbit, provides flexibility in implementation, and reduces the need for coordination among administrations.

  17. Factors that influence the non-technical skills performance of scrub nurses: a prospective study.

    PubMed

    Kang, Evelyn; Massey, Debbie; Gillespie, Brigid M

    2015-12-01

    To identify and describe the factors that impact on the performance of scrub nurses' non-technical skills performance during the intra-operative phase of surgery. Non-technical skills have been identified as important precursors to errors in the operating room. However, few studies have investigated factors influencing non-technical skills of scrub nurses. Prospective observational study. Structured observations were performed on a sample of 182 surgical procedures across eight specialities by two trained observers from August 2012-April 2013 at two hospital sites. Participants were purposively selected scrub nurses. Bivariate correlations and a multiple linear regression model were used to identify associations among length of surgery, patients' acuity using the American Society of Anesthesiologists classification system, team familiarity, number of occasions scout nurses leave the operating room, change of scout nurse and the outcome, the non-technical skills performance of scrub nurses. Patient acuity and team familiarity were the strongest predictors of scrub nurses' non-technical skills performance at hospital site A. There were no correlations between the predictors and the performance of scrub nurses at hospital site B. A dedicated surgical team and patient acuity potentially influence the performance of scrub nurses' non-technical skills. Familiarity with team members foster advanced planning, thus minimizing distractions and interruptions that impact on scrub nurses' performance. Development of interventions aimed at improving non-technical skills has the potential to make a substantial difference and enhance patient care. © 2015 John Wiley & Sons Ltd.

  18. Key Planning Factors for Recovery from a Biological Terrorism Incident

    DTIC Science & Technology

    2012-08-30

    Goals, this document identifies key technical planning areas that may be used to inform subsequent FEMA response and recovery guidance documents. The...expressed herein do not necessarily state or reflect those of their respective organizations or the US Government. The modeling and analysis provided by...responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would

  19. Wind-turbine-performance assessment

    NASA Astrophysics Data System (ADS)

    Vachon, W. A.

    1982-06-01

    An updated summary of recent test data and experiences is reported from both federally and privately funded large wind turbine (WT) development and test programs, and from key WT programs in Europe. Progress and experiences on both the cluster of three MOD-2 2.5-MW WT's, the MOD-1 2-MW WT, and other WT installations are described. An examination of recent test experiences and plans from approximately five privately funded large WT programs in the United States indicates that, during machine checkout and startup, technical problems are identified, which require and startup, a number of technical problems are identified, which will require design changes and create program delays.

  20. Lincoln Advanced Science and Engineering Reinforcement (LASER) program

    NASA Technical Reports Server (NTRS)

    Williams, Willie E.

    1989-01-01

    Lincoln University, under the Lincoln Advanced Science and Engineering Reinforcement (LASER) Program, has identified and successfully recruited over 100 students for majors in technical fields. To date, over 70 percent of these students have completed or will complete technical degrees in engineering, physics, chemistry, and computer science. Of those completing the undergraduate degree, over 40 percent have gone on to graduate and professional schools. This success is attributable to well planned approaches to student recruitment, training, personal motivation, retention, and program staff. Very closely coupled to the above factors is a focus designed to achieve excellence in program services and student performance. Future contributions by the LASER Program to the pool of technical minority graduates will have a significant impact. This is already evident from the success of the students that began the first year of the program. With program plans to refine many of the already successful techniques, follow-on activities are expected to make even greater contributions to the availability of technically trained minorities. For example, undergraduate research exposure, broadened summer, and co-op work experiences will be enhanced.

  1. Maximizing mitigation benefits-making a difference with strategic inter-resource agency planning : year two technical report.

    DOT National Transportation Integrated Search

    2014-11-01

    The objective of this research project is to assess current mitigation policies and practices in comparison to : resource agency objectives and to identify mitigation strategies and priorities that provide greater cost-benefit potential and implement...

  2. Maximizing mitigation benefits-making a difference with strategic inter-resource agency planning : year one technical report.

    DOT National Transportation Integrated Search

    2014-04-01

    The objective of this research project is to assess current mitigation policies and practices in comparison to : resource agency objectives, and identify mitigation strategies and priorities that provide greater cost-benefit : potential and implement...

  3. Mission objectives and trajectories

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The present state of the knowledge of asteroids was assessed to identify mission and target priorities for planning asteroidal flights in the 1980's and beyond. Mission objectives, mission analysis, trajectory studies, and cost analysis are discussed. A bibliography of reports and technical memoranda is included.

  4. Organization Development: Concept, Process, and Applications in the Department of Defense

    DTIC Science & Technology

    1989-04-01

    collection, the consultant performs an organizational diagnosis in which the focus is on identifying ways to improve the technical, administrative, and...dynamics, and organizational diagnosis . 2. Action/Planning Workshops. This activity consisted of management conferences and management/worker conferences

  5. Develop a Comprehensive Technical Training and Data Collection Program for Structural Welders and Fitters: Technical Proposal

    DTIC Science & Technology

    2006-05-30

    implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails

  6. INDEPENDENT REVIEW OF THE X-701B GROUNDWATER REMEDY, PORTSMOUTH, OHIO: TECHNICAL EVALUATION AND RECOMMENDATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, B.; Eddy-Dilek, C.; Costanza, J.

    2008-12-15

    The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issuedmore » by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are recommended, the team should identify the type of injection and target soil horizon for these injections; (2) Consider the feasibility of declaring Technical Impracticability and proceeding with the RCRA Cap for the X-701B; and (3) Provide a summary of other cost-effective technologies that could be implemented (especially for the lower Gallia). The Independent Technical Review team focused its evaluation solely on the X-701B source zone and contaminant plume. It did not review current or planned remedial activities at other plumes, waste areas, or landfills at the Portsmouth site, nor did it attempt to integrate such activities into its recommendations for X-701B. However, the ultimate selection of a remedy for X-701B by site personnel and regulators should take into account potentially synergistic efforts at other waste areas. Assessment of remedial alternatives in the context of site-wide management practices may reveal opportunities for leveraging and savings that would not otherwise be identified. For example, the cost of source-zone excavation or construction of a permeable reactive barrier at X-701B might be substantially reduced if contaminated soil could be buried on site at an existing or planned landfill. This allowance would improve the feasibility and competitiveness of both remedies. A comprehensive examination of ongoing and future environmental activities across the Portsmouth Gaseous Diffusion Plant is necessary to optimize the selection and timing of X-701B remediation with respect to cleanup efficiency, safety, and economics. A selected group of technical experts attended the technical workshop at the Portsmouth Gaseous Diffusion Plant from November 18 through 21, 2008. During the first day of the workshop, both contractor and DOE site personnel briefed the workshop participants and took them on a tour of the X-701B site. The initial briefing was attended by representatives of Ohio EPA who participated in the discussions. On subsequent days, the team reviewed baseline data and reports, were provided additional technical information from site personnel, evaluated work plans, determined critical issues and uncertainties, and recommended alternatives. This report documents the findings and recommendations of the independent technical review team.« less

  7. Planning and scheduling lessons learned study, executive summary

    NASA Technical Reports Server (NTRS)

    Robinson, Toni

    1990-01-01

    The study was performed to document the lessons on planning and scheduling activities for a number of missions and institutional facilities in such a way that they can be applied to future missions; to provide recommendations to both projects and Code 500 that will improve the end-to-end planning and scheduling process; and to identify what, if any, mission characteristics might be related to certain lessons learned. The results are a series of recommendations of both a managerial and technical nature related to the underlying lessons learned.

  8. Shuttle payload interface verification equipment study. Volume 2: Technical document, part 1

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The technical analysis is reported that was performed during the shuttle payload interface verification equipment study. It describes: (1) the background and intent of the study; (2) study approach and philosophy covering all facets of shuttle payload/cargo integration; (3)shuttle payload integration requirements; (4) preliminary design of the horizontal IVE; (5) vertical IVE concept; and (6) IVE program development plans, schedule and cost. Also included is a payload integration analysis task to identify potential uses in addition to payload interface verification.

  9. Incorporating Ecosystem Goods and Services in Environmental Planning - Definitions, Classification and Operational Approaches

    DTIC Science & Technology

    2013-07-01

    water resource project planning and management; the authors also seek to identify any research needs to accommodate that goal. This technical note and...review of the state of the science of EGS and highlights the types of analytical tools, techniques, and considerations that would be needed within a...instructions, searching existing data sources, gathering and maintaining the data needed , and completing and reviewing the collection of information. Send

  10. Evaluation and demonstration of commercialization potential of CCSI tools within gPROMS advanced simulation platform

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawal, Adekola; Schmal, Pieter; Ramos, Alfredo

    PSE, in the first phase of the CCSI commercialization project, set out to identify market opportunities for the CCSI tools combined with existing gPROMS platform capabilities and develop a clear technical plan for the proposed commercialization activities.

  11. Policy content and stakeholder network analysis for infant and young child feeding in Nepal.

    PubMed

    Karn, Sumit; Devkota, Madhu Dixit; Uddin, Shahadat; Thow, Anne Marie

    2017-06-13

    Despite concerted effort from government and partners, Nepal continues to have a high burden of under nutrition among children. Identifying opportunities to strengthen policy support for infant and young child feeding (IYCF) is a key component to improve child survival, growth and development. This study aims to explore policy support for IYCF and to identify the influential stakeholders for IYCF for effective future policy development and programmatic action. Policies relevant to IYCF were identified through web searches and direct approaches to relevant government ministries. Policy content was analysed based on four key domains focussed on mothers, using a qualitative synthesis approach. Three group interviews were conducted using the participatory tool "Net-Map", to identify the influential stakeholders in IYCF policy and programming processes. Twenty-six relevant policy documents were analysed for content relating to IYCF. General support for IYCF was found in most of the development plans and high-level health sector policies. Most implementation level documents included support for provision of correct information to mothers. Capacity building of frontline workers for IYCN and system strengthening were well supported through sectoral plans and policies. However, gaps were identified regarding maternity protection, support for monitoring and evaluation, and translation of high-level policy directives into implementation level guidelines, resulting in a lack of clarity over roles and responsibilities. Both government and non-governmental stakeholders, particularly donors, emerged as influential drivers of IYCF policy decisions in Nepal, through technical assistance and funding. The Nutrition Technical Committee under the Ministry of Health, UNICEF, Suaahara, USAID and WHO were identified as key actors providing technical assistance. Key funding agencies were identified as UNICEF and USAID. This study reveals strong policy support for key dimensions of IYCF, supported by a highly networked stakeholder environment. Opportunities to further strengthen IYCF policy in Nepal include: further support for training of frontline workers and complementary feeding interventions; extending maternity leave provisions; and clarifying roles and responsibilities of actors, particularly non-governmental actors. Engaging technical and funding agencies and developing partnerships with other relevant actors will be crucial for ensuring effective policy translates into effective practice.

  12. Engineering Technical Review Planning Briefing

    NASA Technical Reports Server (NTRS)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  13. Systems Engineering Assessment & Workforce Development Plan

    DTIC Science & Technology

    2012-11-05

    Government or its technical domains. Other fields, such as culinary and healthcare, have also identified these emerging and growing issues (Calhoun...et al. (2009). "The Art and Science of Systems Engineering." Systems Research Forum 3(2): 81-100. Shenhar, A. and B. Sauser, Eds. (2009). Systems

  14. A Hierarchy of Management Training Requirements: The Competency Domain Model.

    ERIC Educational Resources Information Center

    Sandwith, Paul

    1993-01-01

    The Competency Domain Model has five domains of management competencies: conceptual/creative, leadership, interpersonal, administrative, and technical. Specific competencies and training plans can be identified in each domain for different levels--first line supervisor, field office manager, assistant manager, area manager, director of operations.…

  15. International Assistance for Low-Emission Development Planning: Coordinated Low Emissions Assistance Network (CLEAN) Inventory of Activities and Tools--Preliminary Trends

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cox, S.; Benioff, R.

    2011-05-01

    The Coordinated Low Emissions Assistance Network (CLEAN) is a voluntary network of international practitioners supporting low-emission planning in developing countries. The network seeks to improve quality of support through sharing project information, tools, best practices and lessons, and by fostering harmonized assistance. CLEAN has developed an inventory to track and analyze international technical support and tools for low-carbon planning activities in developing countries. This paper presents a preliminary analysis of the inventory to help identify trends in assistance activities and tools available to support developing countries with low-emission planning.

  16. Rapid Development: A Content Analysis Comparison of Literature and Purposive Sampling of AFRL Rapid Reaction Projects

    DTIC Science & Technology

    2011-12-01

    systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical

  17. Turnaround operations analysis for OTV. Volume 2: Detailed technical report

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

  18. The future of hydropower planning modeling

    NASA Astrophysics Data System (ADS)

    Haas, J.; Zuñiga, D.; Nowak, W.; Olivares, M. A.; Castelletti, A.; Thilmant, A.

    2017-12-01

    Planning the investment and operation of hydropower plants with optimization tools dates back to the 1970s. The focus used to be solely on the provision of energy. However, advances in computational capacity and solving algorithms, dynamic markets, expansion of renewable sources, and a better understanding of hydropower environmental impacts have recently led to the development of novel planning approaches. In this work, we provide a review, systematization, and trend analysis of these approaches. Further, through interviews with experts, we outline the future of hydropower planning modeling and identify the gaps towards it. We classified the found models along environmental, economic, multipurpose and technical criteria. Environmental interactions include hydropeaking mitigation, water quality protection and limiting greenhouse gas emissions from reservoirs. Economic and regulatory criteria consider uncertainties of fossil fuel prices and relicensing of water rights and power purchase agreements. Multipurpose considerations account for irrigation, tourism, flood protection and drinking water. Recently included technical details account for sedimentation in reservoirs and variable efficiencies of turbines. Additional operational considerations relate to hydrological aspects such as dynamic reservoir inflows, water losses, and climate change. Although many of the above criteria have been addressed in detail on a project-to-project basis, models remain overly simplistic for planning large power fleets. Future hydropower planning tools are expected to improve the representation of the water-energy nexus, including environmental and multipurpose criteria. Further, they will concentrate on identifying new sources of operational flexibility (e.g. through installing additional turbines and pumps) for integrating renewable energy. The operational detail will increase, potentially emphasizing variable efficiencies, storage capacity losses due to sedimentation, and the timing of inflows (which are becoming more variable under climate change). Finally, the relicensing of existing operations and planning new installations are subject to deep uncertainties that need to be captured.

  19. Nanotechnology for forest products. Part 2

    Treesearch

    Theodore Wegner; Phil Jones

    2005-01-01

    In planning for the Nanotechnology for the Forest products Industry Workshop, we considered many different options for organizing technical focus areas for breakout discussion sessions. We felt the fallowing R&D focus areas provide the best path forward for a nanotechnology roadmap by identifying the underlying science and technology needed: also, they foster...

  20. Development of Comprehensive State Dissemination Plans: An Overview of Present Status.

    ERIC Educational Resources Information Center

    Haenn, Joseph F.

    Established by NIE in June 1975, the State Dissemination Grants Program provides resources to state education agencies to develop comprehensive and generalized dissemination capacity, which is defined as the leadership and service capability to provide information and technical assistance in the solution of problems identified by the dissemination…

  1. A Technical Infrastructure to Integrate Dynamics AX ERP and CRM into University Curriculum

    ERIC Educational Resources Information Center

    Wimmer, Hayden; Hall, Kenneth

    2016-01-01

    Enterprise Resource Planning and Customer Relationship Management are becoming important topics at the university level, and are increasingly receiving course-level attention in the curriculum. In fact, the Information Systems Body of Knowledge specifically identifies Enterprise Architecture as an Information Systems-specific knowledge area. The…

  2. Mexico’s National Cancer Control Plan: From Development to Implementation

    Cancer.gov

    The National Cancer Institute and the Center for Global Health have had a long-standing and successful partnership with INCan, and at their request are identifying new or enhanced ways to provide technical support by way of resources, training, and collaborative programs to facilitate the implementation of the NCCP.

  3. Tribal Child Care Facilities: A Guide to Construction and Renovation.

    ERIC Educational Resources Information Center

    National Child Care Information Center, Vienna, VA.

    This document provides technical assistance in addressing major areas of the child care facility construction and renovation process, including conducting a child care community needs assessment, identifying a site, financing costs, developing a business plan, conducting an environmental assessment, building and designing a facility, and hiring…

  4. Merit Pay and Faculty Evaluation.

    ERIC Educational Resources Information Center

    Hudgins, James L.

    A program linking merit pay and faculty evaluation was initiated at Sumter Area Technical College (SATC) in Sumter, South Carolina, in 1978. The performance-based evaluation system focuses on three elements: the job description, which identifies professional responsibilities and how they relate to the college's mission; the individual action plan;…

  5. Technical Assistance Plan (TAP)

    EPA Pesticide Factsheets

    A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.

  6. An Analysis of the Literature to Identify Staff Development Requirements for Practical Nursing Instructors. Vocational-Technical Education Research Report. Health Occupations, Monograph No. 10, Vol. 16, No. 4.

    ERIC Educational Resources Information Center

    Moore, Susan C.; Hole, F. Marvin

    A review of the literature on continuing education was done to identify the literature related to practical nursing instructors, analyze the literature to see how it affects the practical nursing instructor, and make recommendations for a long-term plan of staff development for practical nursing instructors in Pennsylvania. The literature revealed…

  7. Technical Needs for Prototypic Prognostic Technique Demonstration for Advanced Small Modular Reactor Passive Components

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meyer, Ryan M.; Coble, Jamie B.; Hirt, Evelyn H.

    2013-05-17

    This report identifies a number of requirements for prognostics health management of passive systems in AdvSMRs, documents technical gaps in establishing a prototypical prognostic methodology for this purpose, and describes a preliminary research plan for addressing these technical gaps. AdvSMRs span multiple concepts; therefore a technology- and design-neutral approach is taken, with the focus being on characteristics that are likely to be common to all or several AdvSMR concepts. An evaluation of available literature is used to identify proposed concepts for AdvSMRs along with likely operational characteristics. Available operating experience of advanced reactors is used in identifying passive components thatmore » may be subject to degradation, materials likely to be used for these components, and potential modes of degradation of these components. This information helps in assessing measurement needs for PHM systems, as well as defining functional requirements of PHM systems. An assessment of current state-of-the-art approaches to measurements, sensors and instrumentation, diagnostics and prognostics is also documented. This state-of-the-art evaluation, combined with the requirements, may be used to identify technical gaps and research needs in the development, evaluation, and deployment of PHM systems for AdvSMRs. A preliminary research plan to address high-priority research needs for the deployment of PHM systems to AdvSMRs is described, with the objective being the demonstration of prototypic prognostics technology for passive components in AdvSMRs. Greater efficiency in achieving this objective can be gained through judicious selection of materials and degradation modes that are relevant to proposed AdvSMR concepts, and for which significant knowledge already exists. These selections were made based on multiple constraints including the analysis performed in this document, ready access to laboratory-scale facilities for materials testing and measurement, and potential synergies with other national laboratory and university partners.« less

  8. Resource Planning Model | Energy Analysis | NREL

    Science.gov Websites

    balancing authority. An image of a overlapping circles labelled Resource, Technical, Economic, and Market competing electricity technologies. An image of a overlapping circles labelled Resource, Technical, Economic ; Federal Resource Planning. Volume 1: Sectoral, Technical, and Economic Trends, NREL Technical Report (2016

  9. Johnson Space Center Health and Medical Technical Authority

    NASA Technical Reports Server (NTRS)

    Fogarty, Jennifer A.

    2010-01-01

    1.HMTA responsibilities: a) Assure program/project compliance with Agency health and medical requirements at identified key decision points. b) Certify that programs/projects comply with Agency health and medical requirements prior to spaceflight missions. c) Assure technical excellence. 2. Designation of applicable NASA Centers for HMTA implementation and Chief Medical Officer (CMO) appointment. 3. Center CMO responsible for HMTA implementation for programs and projects at the center. JSC HMTA captured in "JSC HMTA Implementation Plan". 4. Establishes specifics of dissenting opinion process consistent with NASA procedural requirements.

  10. Variable Cycle Engine Technology Program Planning and Definition Study

    NASA Technical Reports Server (NTRS)

    Westmoreland, J. S.; Stern, A. M.

    1978-01-01

    The variable stream control engine, VSCE-502B, was selected as the base engine, with the inverted flow engine concept selected as a backup. Critical component technologies were identified, and technology programs were formulated. Several engine configurations were defined on a preliminary basis to serve as demonstration vehicles for the various technologies. The different configurations present compromises in cost, technical risk, and technology return. Plans for possible variably cycle engine technology programs were formulated by synthesizing the technology requirements with the different demonstrator configurations.

  11. Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 5: Systems engineering/integration research and technology

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1981-01-01

    Guidelines and ground rules followed in the development of requirements for the SPS are presented. Development planning objectives are specified in each of these areas, and evolutionary SPS program scenarios are described for the various concepts studied during the past one year contract. Program descriptions are presented as planning packages of technical tasks, and schedule phasing. Each package identifies the ground based technology effort that will facilitate SPS definitions, designs, development, and operations.

  12. Methodology for Planning Technical Education: With a Case Study of Polytechnics in Bangladesh.

    ERIC Educational Resources Information Center

    Ritzen, Jozef M.; Balderston, Judith B.

    A product of research first begun by one of the authors in Bangladesh, this book develops a comprehensive set of methods for planning technical education. Wherever possible, the authors draw on existing tools, fitting them to the specific context of technical education. When faced with planning problems for which existing methods are ill suited…

  13. 75 FR 27341 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference To Discuss Increasing Market and Planning Efficiency Through Improved Software May 7, 2010. Take notice that Commission... planning efficiency through improved software. [[Page 27342

  14. Predictors of employer satisfaction: technical and non-technical skills.

    PubMed

    Danielson, Jared A; Wu, Tsui-Feng; Fales-Williams, Amanda J; Kirk, Ryan A; Preast, Vanessa A

    2012-01-01

    Employers of 2007-2009 graduates from Iowa State University College of Veterinary Medicine were asked to respond to a survey regarding their overall satisfaction with their new employees as well as their new employees' preparation in several technical and non-technical skill areas. Seventy-five responses contained complete data and were used in the analysis. Four technical skill areas (data collection, data interpretation, planning, and taking action) and five non-technical skill areas (interpersonal skills, ability to deal with legal issues, business skills, making referrals, and problem solving) were identified. All of the skill area subscales listed above had appropriate reliability (Cronbach's alpha>0.70) and were positively and significantly correlated with overall employer satisfaction. Results of two simultaneous regression analyses indicated that of the four technical skill areas, taking action is the most salient predictor of employer satisfaction. Of the five non-technical skill areas, interpersonal skills, business skills, making referrals, and problem solving were the most important skills in predicting employer satisfaction. Hierarchical regression analysis revealed that all technical skills explained 25% of the variation in employer satisfaction; non-technical skills explained an additional 42% of the variation in employer satisfaction.

  15. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  16. INDOT Technical Training Plan

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...

  17. Minnesota Area Vocational-Technical Institutes. A Plan to Address Declining Enrollments and Resources. Submitted to the Minnesota State Legislature

    ERIC Educational Resources Information Center

    Minnesota State Board for Vocational Education, St. Paul.

    In March 1982, the Minnesota Division of Vocational-Technical Education received requests from State legislators to develop an action plan to address the problems of declining enrollments and resources. In response to this request, a plan was developed whereby area vocational-technical institutes (AVTIs) in the State would (1) promote a process…

  18. 75 FR 16499 - Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ...] Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum (Astragalus... availability of the technical agency draft recovery plan for Pyne's ground-plum (Astragalus bibullatus), a...: Background We listed Pyne's ground-plum as an endangered species under the Act (16 U.S.C. 1531 et seq.), on...

  19. Enrollment Management Issue Analysis: Operating in a Post-Katrina Higher Education Environment

    ERIC Educational Resources Information Center

    Jones, Jacqueline; Das, Nabakrishna; Huggins, Desiree'; McNeely, Stanton, III

    2008-01-01

    A definition and brief history of enrollment management are presented. The challenges represented by Hurricane Katrina for enrollment management at one community technical college and a private 4-year college are identified along with three cases that illuminate the challenges. The need for rapid response planning is articulated. (Contains 1…

  20. Guidelines for qualifying cleaning and verification materials

    NASA Technical Reports Server (NTRS)

    Webb, D.

    1995-01-01

    This document is intended to provide guidance in identifying technical issues which must be addressed in a comprehensive qualification plan for materials used in cleaning and cleanliness verification processes. Information presented herein is intended to facilitate development of a definitive checklist that should address all pertinent materials issues when down selecting a cleaning/verification media.

  1. Optimizing the experimental design using the house mouse (Mus musculus L.) as a model for determining grain feeding preferences

    USDA-ARS?s Scientific Manuscript database

    Technical Abstract: BACKGROUND: There is little research evaluating flavor preferences among wheat varieties. We previously demonstrated that mice exert very strong preferences when given binary mixtures of wheat varieties. We plan to utilize mice to identify varieties and genes associated with pref...

  2. An Analysis of Career Services Usage and Satisfaction at Delaware Technical Community College Terry Campus

    ERIC Educational Resources Information Center

    Strusowski, Lisa June

    2013-01-01

    Career centers at community colleges across America are utilizing technology in a variety of ways to efficiently and effectively deliver their services to students. Therefore, identifying and understanding the technology-related preferences and needs of community college students is fundamental for planning and establishing relevant online career…

  3. Final Technical Report: PV Fault Detection Tool.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, Bruce Hardison; Jones, Christian Birk

    The PV Fault Detection Tool project plans to demonstrate that the FDT can (a) detect catastrophic and degradation faults and (b) identify the type of fault. This will be accomplished by collecting fault signatures using different instruments and integrating this information to establish a logical controller for detecting, diagnosing and classifying each fault.

  4. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It alsomore » summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.« less

  5. Maintaining technical excellence requires a national plan

    NASA Technical Reports Server (NTRS)

    Davidson, T. F.

    1991-01-01

    To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.

  6. INDOT Technical Training Plan : Appendix B

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  7. INDOT Technical Training Plan : Appendix M

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  8. INDOT Technical Training Plan : Appendix P

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  9. INDOT Technical Training Plan : Appendix F

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  10. INDOT Technical Training Plan : Appendix H

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  11. INDOT Technical Training Plan : Appendix E

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  12. INDOT Technical Training Plan : Appendix O

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  13. INDOT Technical Training Plan : Appendix J

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  14. INDOT Technical Training Plan : Appendix L

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  15. INDOT Technical Training Plan : Appendix A

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  16. INDOT Technical Training Plan : Appendix D

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  17. INDOT Technical Training Plan : Appendix K

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  18. INDOT Technical Training Plan : Appendix G

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  19. INDOT Technical Training Plan : Appendix I

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  20. INDOT Technical Training Plan : Appendix N

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  1. INDOT Technical Training Plan : Appendix C

    DOT National Transportation Integrated Search

    2012-04-01

    The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...

  2. Reform of China's Technical and Vocational Education in the Transition from a Planned Economy System to a Socialist Market Economy System--A Case Study. Case Studies on Technical and Vocational Education in Asia and the Pacific.

    ERIC Educational Resources Information Center

    Yu, Zuguang; Zeng, Zida

    Since the early 1990s, China's government has followed a socialist market economy system. Accordingly, the technical and vocational education (TVE) should be restructured to meet its needs. Reform of the TVE system has four aspects. First, reform of the planning system includes a move from a central plan of enrollment to planning according to…

  3. Air Force Research Laboratory space technology strategic investment model: analysis and outcomes for warfighter capabilities

    NASA Astrophysics Data System (ADS)

    Preiss, Bruce; Greene, Lloyd; Kriebel, Jamie; Wasson, Robert

    2006-05-01

    The Air Force Research Laboratory utilizes a value model as a primary input for space technology planning and budgeting. The Space Sector at AFRL headquarters manages space technology investment across all the geographically disparate technical directorates and ensures that integrated planning is achieved across the space community. The space investment portfolio must ultimately balance near, mid, and far-term investments across all the critical space mission areas. Investment levels and growth areas can always be identified by a typical capability analysis or gap analysis, but the value model approach goes one step deeper and helps identify the potential payoff of technology investments by linking the technology directly to an existing or potential concept. The value of the technology is then viewed from the enabling performance perspective of the concept that ultimately fulfills the Air Force mission. The process of linking space technologies to future concepts and technology roadmaps will be reviewed in this paper, along with representative results from this planning cycle. The initial assumptions in this process will be identified along with the strengths and weaknesses of this planning methodology.

  4. Megan Day | NREL

    Science.gov Websites

    research, analysis, and technical assistance on municipal energy planning and policy, utility-scale Baseline Analysis of Municipal Codification across the U.S., NREL Technical Report (2016) Navajo Generating Station & Federal Resource Planning - Volume 1: Sectoral, Technical, and Economic Trends, NREL

  5. An analysis of land use planning and equity issues surrounding hazardous liquid and natural gas transmission pipelines in North Carolina

    NASA Astrophysics Data System (ADS)

    Osland, Anna Christine

    Hazardous liquid and natural gas transmission pipelines have received limited attention by planning scholars even though local development decisions can have broad consequences if a rupture occurs. In this dissertation, I evaluated the implications of land-use planning for reducing risk to transmission pipeline hazards in North Carolina via three investigations. First, using a survey of planning directors in jurisdictions with transmission pipeline hazards, I investigated the land use planning tools used to mitigate pipeline hazards and the factors associated with tool adoption. Planning scholars have documented the difficulty of inducing planning in hazardous areas, yet there remain gaps in knowledge about the factors associated with tool adoption. Despite the risks associated with pipeline ruptures, I found most localities use few mitigation tools, and the adoption of regulatory and informational tools appear to be influenced by divergent factors. Whereas risk perception, commitment, capacity, and community context were associated with total tool and information tool use, only risk perception and capacity factors were associated with regulatory tool use. Second, using interviews of emergency managers and planning directors, I examined the role of agency collaboration for building mitigation capacity. Scholars have highlighted the potential of technical collaboration, yet less research has investigated how inter-agency collaboration shapes mitigation capacity. I identify three categories of technical collaboration, discuss how collaborative spillovers can occur from one planning area to another, and challenge the notion that all technical collaborations result in equal mitigation outcomes. Third, I evaluated characteristics of the population near pipelines to address equity concerns. Surprisingly, I did not find broad support for differences in exposure of vulnerable populations. Nonetheless, my analyses uncovered statistically significant clusters of vulnerable groups within the hazard area. Interestingly, development closer to pipelines was newer than areas farther away, illustrating the failure of land-use planning to reduce development encroachment. Collectively, these results highlight the potential of land-use planning to keep people and development from encroaching on pipeline hazards. While this study indicates that planners in many areas address pipeline hazards, it also illustrates how changes to local practices can further reduce risks to human health, homeland security, and the environment.

  6. Control of Technology Transfer at JPL

    NASA Technical Reports Server (NTRS)

    Oliver, Ronald

    2006-01-01

    Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

  7. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  8. Planning as an Iterative Process

    NASA Technical Reports Server (NTRS)

    Smith, David E.

    2012-01-01

    Activity planning for missions such as the Mars Exploration Rover mission presents many technical challenges, including oversubscription, consideration of time, concurrency, resources, preferences, and uncertainty. These challenges have all been addressed by the research community to varying degrees, but significant technical hurdles still remain. In addition, the integration of these capabilities into a single planning engine remains largely unaddressed. However, I argue that there is a deeper set of issues that needs to be considered namely the integration of planning into an iterative process that begins before the goals, objectives, and preferences are fully defined. This introduces a number of technical challenges for planning, including the ability to more naturally specify and utilize constraints on the planning process, the ability to generate multiple qualitatively different plans, and the ability to provide deep explanation of plans.

  9. Presentation Of Comparative Data for Transportation Planning Studies

    DOT National Transportation Integrated Search

    1997-01-01

    Clear, yet detailed, presentations of transportation planning data to lay groups as well as to technical groups is becoming more and more of a necessity in the planning process. Presentation of technical information in understandable terms has become...

  10. 7 CFR 4284.621 - Eligible grant purposes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... by providing technical assistance for business development and economic development planning. Grant...-county economic development planning; (5) Establish centers for training, technology, and trade that will... professional services necessary to conduct the technical assistance, training, or planning functions. (b...

  11. New Directions for High School Career and Technical Education in Wyoming: A Strategic Plan

    ERIC Educational Resources Information Center

    Hoachlander, Gary; Klein, Steven; Studier, Carol

    2007-01-01

    This report offers a plan for improving career and technical education (CTE) in Wyoming, but it is about more than just technical education. Realizing the potential of CTE to contribute to students' mastery of both academic and technical knowledge depends not only on strengthening the CTE curriculum, but also on embedding CTE in a larger program…

  12. Practical Problems in Connection with the Planning and Introduction of Information Systems. Technical Report.

    ERIC Educational Resources Information Center

    Klose, Traugott

    Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…

  13. National Planning of Vocational and Technical Training. Colombo Plan Seminar. (Thimphu, Bhutan, April 19-22, 1976)

    ERIC Educational Resources Information Center

    Colombo Plan Bureau (Sri Lanka).

    Focusing on the last in a series of seven seminars conducted by the Colombo Plan Bureau between 1969 and 1975 on the theme, "National Planning of Vocational and Technical Training," this report presents the proceedings of a seminar on the vocational education and training needs of one of the Colombo Plan members, Bhutan. Five working…

  14. Higher Education in California: New Goals for the Master Plan. Technical Appendices

    ERIC Educational Resources Information Center

    Johnson, Hans

    2010-01-01

    To determine new eligibility goals for California, the author and his colleagues developed a student flow model that projects student enrollment and degrees awarded for each year from 2005 to 2025. To develop the model, they first developed population projections for the state. They also used a plethora of data sources to identify current trends…

  15. Library Instruction in the Electronic Library: The University of Arizona's Electronic Library Education Centers.

    ERIC Educational Resources Information Center

    Glogoff, Stuart

    1995-01-01

    Discusses two Electronic Library Education Centers (ELECs) created at the University of Arizona to improve library instruction in the use of online resources. Examines costs of developing ELECs; technical changes experienced; and benefits to users and librarians. A sidebar by Abbie J. Basile identifies Internet resources for planning and/or…

  16. Seeking Direction for Vocational and Technical Education in the 1990s. Report of Fiscal Years 1986-88.

    ERIC Educational Resources Information Center

    Sheppard Pratt National Center for Human Development, Baltimore, MD.

    In its first three sections, this report lists members of the Montana Council on Vocational Education, describes the council structure, identifies its purpose, and outlines its duties and responsibilities. Section 4 describes the activities of three standing committees: policy and planning; evaluation and employment; and coordination and…

  17. Development of an Updated Strategic Marketing Plan for Fox Valley Technical College.

    ERIC Educational Resources Information Center

    May, Susan A.

    This project was conducted to develop a comprehensive strategic marketing plan for Fox Valley Technical College (FVTC). Components included a review of the literature, establishing criteria for the plan, validation of the criteria, the actual development of the plan involving a formative committee, and the review of institutional marketing plans…

  18. Direct heat geothermal opportunities at Pahoa, Hawaii

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moreau, J.; Jones, W.L.

    1980-09-01

    A geothermal commercial park located near Pahoa, Hawaii, has been found to be technically feasible. However, community acceptance varies from optimistic support for the job opportunities to only lukewarm acceptance by most residents of the nearby planned residential community. Interviews, team evaluations, and calculations of energy and transportation savings were used to reduce a list of candidate processes to four. These four include an ethanol plant, a cattle feed mill, a protein recovery plant, and a papaya processing facility. In addition, a research laboratory is planned for the evaluation of other processes identified as very promising.

  19. Thrust and parry of the SIOP (single integrated operational plan) and sdi (strategic defense initiative). Research report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zank, G.D.

    1989-05-01

    The relationship between strategic offensive capabilities (reflected in the SIOP) and emerging strategic defensive capabilities (reflected by SDI) is not being adequately addressed. A summary of the existing nuclear war planning process is provided, and an analagous defensive process is postulated. Parallels and differences between the two processes are discussed. Potential areas for information exchange and cooperation are identified to enhance deterrence and improve war fighting potential. Operational, technical and political issues requiring resolution are raised and recommendations to resolve these issues are made.

  20. Technical basis for external dosimetry at the Waste Isolation Pilot Plant (WIPP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, E.W.; Wu, C.F.; Goff, T.E.

    1993-12-31

    The WIPP External Dosimetry Program, administered by Westinghouse Electric Corporation, Waste Isolation Division, for the US Department of Energy (DOE), provides external dosimetry support services for operations at the Waste Isolation Pilot Plant (WIPP) Site. These operations include the receipt, experimentation with, storage, and disposal of transuranic (TRU) wastes. This document describes the technical basis for the WIPP External Radiation Dosimetry Program. The purposes of this document are to: (1) provide assurance that the WIPP External Radiation Dosimetry Program is in compliance with all regulatory requirements, (2) provide assurance that the WIPP External Radiation Dosimetry Program is derived from amore » sound technical base, (3) serve as a technical reference for radiation protection personnel, and (4) aid in identifying and planning for future needs. The external radiation exposure fields are those that are documented in the WIPP Final Safety Analysis Report.« less

  1. Coosa River Storage Annex, Talladega, Alabama Environmental Investigation, Final Management and Resources Utilization Plan

    DTIC Science & Technology

    1991-02-01

    to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as

  2. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less

  3. Sociotechnical challenges to developing technologies for patient access to health information exchange data

    PubMed Central

    Ancker, Jessica S; Miller, Melissa C; Patel, Vaishali; Kaushal, Rainu

    2014-01-01

    Background Providing patients with access to their medical data is widely expected to help educate and empower them to manage their own health. Health information exchange (HIE) infrastructures could potentially help patients access records across multiple healthcare providers. We studied three HIE organizations as they developed portals to give consumers access to HIE data previously exchanged only among healthcare organizations. Objective To follow the development of new consumer portal technologies, and to identify barriers and facilitators to patient access to HIE data. Methods Semistructured interviews of 15 key informants over a 2-year period spanning the development and early implementation of three new projects, coded according to a sociotechnical framework. Results As the organizations tried to develop functionality that fully served the needs of both providers and patients, plans were altered by technical barriers (primarily related to data standardization) and cultural and legal issues surrounding data access. Organizational changes also played an important role in altering project plans. In all three cases, patient access to data was significantly scaled back from initial plans. Conclusions This prospective study revealed how sociotechnical factors previously identified as important in health information technology success and failure helped to shape the evolution of three novel consumer informatics projects. Barriers to providing patients with seamless access to their HIE data were multifactorial. Remedies will have to address technical, organizational, cultural, and other factors. PMID:24064443

  4. Data Quality Objectives for Tank Farms Waste Compatibility Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BANNING, D.L.

    1999-07-02

    There are 177 waste storage tanks containing over 210,000 m{sup 3} (55 million gal) of mixed waste at the Hanford Site. The River Protection Project (RPP) has adopted the data quality objective (DQO) process used by the U.S. Environmental Protection Agency (EPA) (EPA 1994a) and implemented by RPP internal procedure (Banning 1999a) to identify the information and data needed to address safety issues. This DQO document is based on several documents that provide the technical basis for inputs and decision/action levels used to develop the decision rules that evaluate the transfer of wastes. A number of these documents are presentlymore » in the process of being revised. This document will need to be revised if there are changes to the technical criteria in these supporting documents. This DQO process supports various documents, such as sampling and analysis plans and double-shell tank (DST) waste analysis plans. This document identifies the type, quality, and quantity of data needed to determine whether transfer of supernatant can be performed safely. The requirements in this document are designed to prevent the mixing of incompatible waste as defined in Washington Administrative Code (WAC) 173-303-040. Waste transfers which meet the requirements contained in this document and the Double-Shell Tank Waste Analysis Plan (Mulkey 1998) are considered to be compatible, and prevent the mixing of incompatible waste.« less

  5. Career Planning Workshop offers advice on landing a job

    NASA Astrophysics Data System (ADS)

    Fiske, Peter S.

    As part of a continuing program on career planning and job hunting skills for geoscientists, AGU sponsored a career workshop at the Fall 1994 meeting in San Francisco. Over 100 attended the 2-hour seminar led by Peter Fiske, a post-doc at Lawrence Livermore National Laboratory, and Al Levin, assistant director of graduate counseling and programs at Stanford University's Career Planning and Placement Center. The purpose of the seminar was to help Ph.D.s identify the transferable skills they possess and to outline the basic steps in making the often difficult transition to a new career outside of research science. According to Fiske and Levin, scientists tend to start their career change by searching for specific jobs and organizations they think might be a good match for their technical training and tend to assume that a technical position is the only good match for them. In fact, research-trained scientists possess a number of transferable skills that are valued in a wide variety of work environments, such as good communication, organizational, and team work skills, and independence.

  6. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less

  7. National plan for prevention, early detection, and cancer control in Peru.

    PubMed

    Vallejos, Carlos

    2013-01-01

    Peru currently is executing an ambitious plan for cancer control: its first nationwide program of cancer prevention and cancer control, and the first such program launched in Latin America. The adequate strategies were identified from previous experience developing smaller initiatives and from knowledge of our epidemiology and priorities. The geographic landscape and sociocultural differences, in which inequalities play a significant role in access to quality education and specialized cancer care, are the main challenges to elaborate strategies to diminish our burden of advanced disease. Challenges were not only identified for the poorest people, but for other sectors of the population. With a growing Peruvian economy in a globalized market context, emerging sectors are being exposed to new risk factors for cancer and educational strategies were implemented. The development of the National Plan for Cancer Control was launched involving not only technical efforts by a multidisciplinary team, but also political concertation.

  8. 76 FR 14584 - Approval and Promulgation of Air Quality Implementation Plans; Montana; Attainment Plan for Libby...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... the timeframe provided in the statute. It must also include supporting technical analyses and... emissions inventory (EI), a woodstove air pollution control calculation, and a technical analysis showing... year (2010); and (2) an attainment demonstration consisting of: (a) Technical analyses that locate...

  9. Safety Standards Plan for Middlesex County Vocational & Technical High Schools.

    ERIC Educational Resources Information Center

    Sommer, Cy

    This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…

  10. 76 FR 45589 - Notice of Submission of Proposed Information Collection to OMB; Application for Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ...: Application for Technical Assistance for Community Planning and Development (CPD) Programs. OMB Approval... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5480-N-71] Notice of Submission of Proposed Information Collection to OMB; Application for Technical Assistance for Community Planning and...

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burton, J. C.; Environmental Research

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at severalmore » former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic mistake sometimes made in the site characterization process is failure to use technically sound available data to form working hypotheses on hydrogeology, contaminant distribution, etc. for initial testing. (3) After assembling and interpreting existing data for the site, the entire technical team visits the site to identify as a group the site characteristics that might prohibit or enhance any particular technological approach. Logistic and community constraints are also identified at this point. (4) After the field visit, the team selects a suite of technologies appropriate to the problem and completes the design of the field program. No one technique works well at all sites, and a suite of techniques is necessary to delineate site features fully. In addition, multiple technologies are employed to increase confidence in conclusions about site features. Noninvasive and minimally invasive technologies are emphasized to minimize risk to the environment, the community, and the staff. In no case is the traditional approach of installing a massive number of monitoring wells followed. A dynamic work plan that outlines the program is produced for the sponsoring and regulatory agencies. The word ''dynamic'' is emphasized because the work plan is viewed as a guide, subject to modification, for the site characterization activity, rather than a document that is absolute and unchangeable. Therefore, the health and safety plan and the quality assurance/quality control plan must be broad and encompass all possible alterations to the plan. The cooperation of the regulating agency is essential in successful implementation of this process. The sponsoring and regulatory agencies are notified if significant changes to the site-specific work plan are necessary. (5) The entire team participates in the technical field program. Several technical activities are undertaken simultaneously. These may range from different surface geophysics investigations to vegetation sampling. Data from the various activities are reduced and interpreted each day by the technical staff. Various computer programs are used to visualize and integrate the data. However, people do the data interpretation and integration, not the computers, which are just one more tool at the site. At the end of the day, the staff members meet, review results, and modify the next day's program as necessary to optimize activities that are generating overlapping or confirming site details. Data are not arbitrarily discarded -- each finding must be explained and understood. Anomalous readings may be due to equipment malfunctions, laboratory error, or the inability of a technique to work in a given setting. The suite of selected technologies is adjusted in the field if necessary. (6) The end result of this process is the optimization of the field activity to produce a high-quality technical product that is cost and time effective.« less

  12. Pellissippi State Technical Community College Five-Year Strategic Planning Directions, 1998-2003.

    ERIC Educational Resources Information Center

    Pellissippi State Technical Community Coll., Knoxville, TN.

    The document contains the strategic plan for Pellissippi State Technical Community College (Tennessee). The previous five-year strategic plan, "The Pathfinder Project," was prepared in 1994 but was out of date before the end of the five-year planning cycle. To secure information for projecting new five-year strategic directions and goals…

  13. 75 FR 30387 - Improving Market and Planning Efficiency Through Improved Software; Notice of Agenda and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... Market and Planning Efficiency Through Improved Software; Notice of Agenda and Procedures for Staff... planning models and software. The technical conference will be held from 8 a.m. to 5:30 p.m. (EDT) on June.... Agenda for AD10-12 Staff Technical Conference on Planning Models and Software Federal Energy Regulatory...

  14. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  15. Risk assessment analysis of the future technical unit dedicated to the evaluation and treatment of motor disabilities.

    PubMed

    Grelier, S; Thetio, M; Quentin, V; Achache, V; Sanchez, N; Leroux, V; Durand, E; Pequignot, R

    2011-03-01

    The National Hospital of Saint Maurice (HNSM) for Physical Medicine and Rehabilitation aims at strengthening its position as a pivot rehabilitation and physical therapy center. The opening in 2011 of a new unit for the evaluation and treatment of motor disabilities meets this objective. This project includes several parts: clinical, financial, architectural, organizational, applied clinical research as well as dealing with medical equipments and information system. This study focuses on the risk assessment of this future technical unit. This study was conducted by a group of professionals working for the hospital. It started with the design of a functional model to better comprehend the system to be analyzed. Risk assessment consists in confronting this functional model to a list of dangers in order to determine the vulnerable areas of the system. Then the team designed some scenarios to identify the causes, securities barriers and consequences in order to rank the risks. The analysis targeted various dangers, e.g. political, strategic, financial, economical, marketing, clinical and operational. The team identified more than 70 risky scenarios. For 75% of them the criticality level was deemed initially tolerable and under control or unacceptable. The implementation of an action plan for reducing the level of risks before opening this technical unit brought the system down to an acceptable level at 66%. A year prior to opening this technical unit for the evaluation and treatment of motor disabilities, conducting this preliminary risk assessment, with its exhaustive and rigorous methodology, enabled the concerned professionals to work together around an action plan for reducing the risks. 2011 Elsevier Masson SAS. All rights reserved.

  16. Identifying content for simulation-based curricula in urology: a national needs assessment.

    PubMed

    Nayahangan, Leizl Joy; Bølling Hansen, Rikke; Gilboe Lindorff-Larsen, Karen; Paltved, Charlotte; Nielsen, Bjørn Ulrik; Konge, Lars

    2017-12-01

    Simulation-based training is well recognized in the transforming field of urological surgery; however, integration into the curriculum is often unstructured. Development of simulation-based curricula should follow a stepwise approach starting with a needs assessment. This study aimed to identify technical procedures in urology that should be included in a simulation-based curriculum for residency training. A national needs assessment was performed using the Delphi method involving 56 experts with significant roles in the education of urologists. Round 1 identified technical procedures that newly qualified urologists should perform. Round 2 included a survey using an established needs assessment formula to explore: the frequency of procedures; the number of physicians who should be able to perform the procedure; the risk and/or discomfort to patients when a procedure is performed by an inexperienced physician; and the feasibility of simulation training. Round 3 involved elimination and reranking of procedures according to priority. The response rates for the three Delphi rounds were 70%, 55% and 67%, respectively. The 34 procedures identified in Round 1 were reduced to a final prioritized list of 18 technical procedures for simulation-based training. The five procedures that reached the highest prioritization were cystoscopy, transrectal ultrasound-guided biopsy of the prostate, placement of ureteral stent, insertion of urethral and suprapubic catheter, and transurethral resection of the bladder. The prioritized list of technical procedures in urology that were identified as highly suitable for simulation can be used as an aid in the planning and development of simulation-based training programs.

  17. Vulnerability Management for an Enterprise Resource Planning System

    NASA Astrophysics Data System (ADS)

    Goel, Shivani; Kiran, Ravi; Garg, Deepak

    2012-09-01

    Enterprise resource planning (ERP) systems are commonly used in technical educational institutions(TEIs). ERP systems should continue providing services to its users irrespective of the level of failure. There could be many types of failures in the ERP systems. There are different types of measures or characteristics that can be defined for ERP systems to handle the levels of failure. Here in this paper, various types of failure levels are identified along with various characteristics which are concerned with those failures. The relation between all these is summarized. The disruptions causing vulnerabilities in TEIs are identified .A vulnerability management cycle has been suggested along with many commercial and open source vulnerability management tools. The paper also highlights the importance of resiliency in ERP systems in TEIs.

  18. Translating Technical Support Into Country Action: The Role of the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children in the Global Plan Era.

    PubMed

    Luo, Chewe; Hirnschall, Gottfried; Rodrigues, Jessica; Romano, Sostena; Essajee, Shaffiq; Rogers, Braeden; McCarthy, Elizabeth; Mwango, Albert; Sangrujee, Nalinee; Adler, Michelle R; Houston, James C; Langa, Judite O; Urso, Marilena; Bolu, Omotayo; Tene, Gilbert; Elat Nfetam, Jean B; Kembou, Etienne; Phelps, Benjamin R

    2017-05-01

    While the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children (IATT) partnership existed before the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), its reconfiguration was critical to coordinating provision of technical assistance that positively influenced country decision-making and program performance. This article describes how the Global Plan anchored the work of the IATT and, in turn, how the IATT's technical assistance helped to accelerate achievement of the Global Plan targets and milestones. The technical assistance that will be discussed addressed a broad range of priority actions and milestones described in the Global Plan: (1) planning for and implementing Option B+; (2) strengthening monitoring and evaluation systems; (3) translating evidence into action and advocacy; and (4) promoting community engagement. This article also reviews the ongoing challenges and opportunities of providing technical assistance in a rapidly evolving environment that calls for ever more flexible and contextualized responses. The effectiveness of technical assistance facilitated by the IATT was defined by its timeliness, evidence base, and unique global perspective that built on the competencies of its partners and promoted synergies across program areas. Reaching the final goal of eliminating vertical transmission of HIV infection and achieving an AIDS-free generation in countries with the highest HIV burden requires that the IATT partnership and technical assistance remain responsive to country-specific needs while aligning with the current programmatic reality and new global goals such as the Sustainable Development Goals and 90-90-90 targets.

  19. Configuration Management Plan for K Basins

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weir, W.R.; Laney, T.

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less

  20. Blueprint for a Needs Assessment: Contributing to a System of Care for Children with Special Needs & Their Families. A Technical Resource Brief.

    ERIC Educational Resources Information Center

    Ireys, Henry T.

    Designed to guide and structure the needs assessment of Pennsylvania children with special health care needs, this document describes six specific steps in planning and conducting a needs assessment. The steps include: (1) stating the goals of the needs assessment, including fulfilling legislative mandates, identifying geographical areas that have…

  1. World Epidemiology Review, Number 88

    DTIC Science & Technology

    1977-11-11

    personnel and technical supplies, as well as the administrative facilities that are required. 69 The plan will involve only bovine cattle, making it...likewise been identified: the abortus, which^ attacks bovine herds; the melitensis, which attacks goats; the suis, which attacks hogs; the ovis, which...of young is the main symptom among female bovine herds, although sterility, barrenness among females, tendon and joint lesions, synovitis, abscesses

  2. Appropriate Technology Sourcebook - For Tools and Techniques That Use Local Skills, Local Resources, and Renewable Sources of Energy. Volume One.

    ERIC Educational Resources Information Center

    Darrow, Ken; Pam, Rick

    Written in non-technical language, this sourcebook identifies plans and books for village and small community technology. It contains reviews of publications from 375 American and foreign sources on agriculture, alternative sources of energy, water supply, health care, housing, and related subjects. Emphasized are small-scale systems using local…

  3. Planning and Monitoring the Quality of Primary Education in Sub-Saharan Africa. AFTHR Technical Note No. 14.

    ERIC Educational Resources Information Center

    Heneveld, Ward

    This report is based on the conviction that improvements in the quality of education must focus on the school as the unit of change. Through a review of the qualitative research literature on school improvement and the more quantitative literature on school effectiveness, a conceptual framework that identifies generic factors that determine school…

  4. Environmental control medical support team

    NASA Technical Reports Server (NTRS)

    Crump, William J.; Kilgore, Melvin V., Jr.

    1988-01-01

    The activities conducted in support of the Environmental Control and Life Support Team during December 7, 1987 through September 30, 1988 are summarized. The majority of the ongoing support has focused on the ECLSS area. Through a series of initial meetings with the ECLSS team and technical literature review, an initial list of critical topics was developed. Subtasks were then identified or additional related tasks received as action items from the ECLSS group meetings. Although most of the efforts focused on providing MSFC personnel with information regarding specific questions and problems related to ECLSS issues, other efforts regarding identifying an ECLSS Medical Support Team and constructing data bases of technical information were also initiated and completed. The specific tasks are as follows: (1) Provide support to the mechanical design and integration of test systems as related to microbiological concerns; (2) Assist with design of Human Subjects Test Protocols; (3) Interpretation and recommendations pertaining to air/water quality requirements; (4) Assist in determining the design specifications required as related to the Technical Demonstration Program; (5) Develop a data base of all microorganisms recovered from previous subsystem testing; (6) Estimates of health risk of individual microbes to test subjects; (7) Assist with setting limits for safety of test subjects; (8) Health monitoring of test subjects; (9) Assist in the preparation of test plans; (10) Assist in the development of a QA/QC program to assure the validity, accuracy and precision of the analyses; and (11) Assist in developing test plans required for future man in the loop testing.

  5. Technical architecture of ONC-approved plans for statewide health information exchange.

    PubMed

    Barrows, Randolph C; Ezzard, John

    2011-01-01

    ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor "hybrid-federated" architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches.

  6. Technical Architecture of ONC-Approved Plans For Statewide Health Information Exchange

    PubMed Central

    Barrows, Randolph C.; Ezzard, John

    2011-01-01

    ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor “hybrid-federated” architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches. PMID:22195059

  7. 40 CFR 52.1690 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) New York § 52.1690 Small business technical and environmental compliance assistance program. On January 11, 1993, the New York State Department of Environmental Conservation submitted a plan for the... Assistance Program for incorporation in the New York state implementation plan. This plan meets the...

  8. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  9. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  10. 40 CFR 52.2732 - Small business technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...

  11. 76 FR 20364 - Notice of Proposed Information Collection: Comment Request; Technical Assistance for Community...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... Information Collection: Comment Request; Technical Assistance for Community Planning and Development Programs AGENCY: Office of the Assistant Secretary for Community Planning And Development, HUD. ACTION: Notice... Community Planning and Development, Department of Housing Urban and Development, 451 7th Street, SW., Room...

  12. Transforming South-South technical support to fight noncommunicable diseases.

    PubMed

    Shakow, Aaron D A; Bukhman, Gene; Adebona, Olumuyiwa; Greene, Jeremy; de Dieu Ngirabega, Jean; Binagwaho, Agnès

    2012-03-01

    At the UN High-Level Meeting on non-communicable diseases (NCD) in September 2011, each member state was challenged to create a multisectoral national policy and plan for the prevention and control of non-communicable disease by 2013. Few low-income countries, however, currently have such plans. Their governments are likely to turn for assistance in drafting and implementation to multilateral agencies and Contract Technical Support Organizations recommended by development partners. Yet because many NCD seen in the lowest-income countries differ significantly from those prevalent elsewhere, existing providers of external technical support may lack the necessary experience to support strategic planning for NCD interventions in these settings. This article reviews currently available mechanisms of technical support for health sector planning. It places them in the broader historical context of post- World War II international development assistance and the more recent campaigns for horizontal "South-South" cooperation and aid effectiveness. It proposes bilateral technical assistance by low income-countries themselves as the natural evolution of development assistance in health. Such programs, it argues, may be able to improve the quality of technical support to low-income countries for strategic planning in the NCD area while directing resources to the regions where they are most needed. Copyright © 2012 World Heart Federation (Geneva). Published by Elsevier B.V. All rights reserved.

  13. A pilot demonstration project of technology application from the aerospace industry to city management (four cities program)

    NASA Technical Reports Server (NTRS)

    Ervin, G. F.; Blomeyer, L. S.

    1972-01-01

    The Four Cities Program has completed the first year of the planned two-year program. At the beginning of the first year, a variety of program initiation activities were accomplished. Contracts were negotiated; science and technology advisors were interviewed, selected and assigned; general indoctrination and integration of the advisors into city affairs occurred; technical needs were identified and related projects pursued; pilot projects for the second year were identified; inter-city coordination on technical problems began to emerge; and the general soundness of the four cities program seems to have been established. Above all, the inter-personal relationships between the advisors and their interfaces in city government appear to be functioning smoothly. The establishment of such mutual respect, trusts, and confidences are believed essential to the success of the program.

  14. AdaNET research project

    NASA Technical Reports Server (NTRS)

    Digman, R. Michael

    1988-01-01

    The components necessary for the success of the commercialization of an Ada Technology Transition Network are reported in detail. The organizational plan presents the planned structure for services development and technical transition of AdaNET services to potential user communities. The Business Plan is the operational plan for the AdaNET service as a commercial venture. The Technical Plan is the plan from which the AdaNET can be designed including detailed requirements analysis. Also contained is an analysis of user fees and charges, and a proposed user fee schedule.

  15. Definition of technology development missions for early Space Station satellite servicing. Volume 2: Technical

    NASA Technical Reports Server (NTRS)

    Cable, D. A.; Diewald, C. A.; Hills, T. C.; Parmentier, T. J.; Spencer, R. A.; Stone, G. E.

    1984-01-01

    Volume 2 contains the Technical Report of the approach and results of the Phase 2 study. The phase 2 servicing study was initiated in June 1983, and is being reported in this document. The scope of the contract was to: (1) define in detail five selected technology development missions (TDM); (2) conduct a design requirement analysis to refine definitions of satellite servicing requirements at the space station; and (3) develop a technology plan that would identify and schedule prerequisite precursor technology development, associated. STS flight experiments and space station experiments needed to provide onorbit validation of the evolving technology.

  16. The Method of Multiple Spatial Planning Basic Map

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fred D. Brent; Lalit Shah; Earl Berry

    The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase IImore » is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The project's intended result is to provide the necessary technical, economic, and environmental information needed by industry to move the EECP forward to detailed design, construction, and operation. The partners in this project are Texaco Energy Systems LLC or TES (a subsidiary of ChevronTexaco), General Electric (GE), Praxair, and Kellogg Brown & Root (KBR) in addition to the U.S. Department of Energy (DOE). TES is providing gasification technology and Fischer-Tropsch (F-T) technology developed by Rentech, GE is providing combustion turbine technology, Praxair is providing air separation technology, and KBR is providing engineering. Each of the EECP subsystems was assessed for technical risks and barriers. A plan was developed to mitigate the identified risks (Phase II RD&T Plan, October 2000). The potential technical and economic risks to the EECP from Task 2.5 can be mitigated by demonstrating that the end-use products derived from the upgrading of the F-T synthesis total liquid product can meet or exceed current specifications for the manufacture of ethylene and propylene chemicals from F-T naphtha, for the generation of hydrogen from F-T naphtha to power fuel cells, for direct blending of F-T diesels into transportation fuels, for the conversion of F-T heavy product wax to transportation fuels, and the conversion of F-T Heavy product wax to a valuable high melting point food-grade specialty wax product. Product evaluations conducted under Task 2.5 of Phase II successfully mitigated the above technical and economic risks to the EECP with the development of product yields and product qualities for the production of chemicals, transportation fuels, and specialty food-grade waxes from the F-T synthesis products.« less

  18. Technical Excellence: A Requirement for Good Engineering

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, William W.

    2008-01-01

    Technical excellence is a requirement for good engineering. Technical excellence has many different ways of expressing itself within engineering. NASA has initiatives that address the enhancement of the Agency's technical excellence and thrust to maintain the associated high level of performance by the Agency on current programs/projects and as it moves into the Constellation Program and the return to the Moon with plans to visit Mars. This paper addresses some of the key initiatives associated with NASA's technical excellence thrust. Examples are provided to illustrate some results being achieved and plans to enhance these initiatives.

  19. A Planning Study for the Conversion of Recorded Books and Magazines from Rigid Discs to Cassettes and Flexible Discs. Final Report.

    ERIC Educational Resources Information Center

    Innovative Systems Research, Inc., Pennsauken, NJ.

    Twelve different conversion plans were delineated and evaluated in the performance of this study effort. An indepth technical, financial, and cost/benefit analysis was included. One plan was determined to be distinctively more cost-effective than any of the other plans because it provided a technically feasible system that assured the maximum…

  20. Pretest Predictions for Phase II Ventilation Tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yiming Sun

    The objective of this calculation is to predict the temperatures of the ventilating air, waste package surface, and concrete pipe walls that will be developed during the Phase II ventilation tests involving various test conditions. The results will be used as inputs to validating numerical approach for modeling continuous ventilation, and be used to support the repository subsurface design. The scope of the calculation is to identify the physical mechanisms and parameters related to thermal response in the Phase II ventilation tests, and describe numerical methods that are used to calculate the effects of continuous ventilation. The calculation is limitedmore » to thermal effect only. This engineering work activity is conducted in accordance with the ''Technical Work Plan for: Subsurface Performance Testing for License Application (LA) for Fiscal Year 2001'' (CRWMS M&O 2000d). This technical work plan (TWP) includes an AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities'', activity evaluation (CRWMS M&O 2000d, Addendum A) that has determined this activity is subject to the YMP quality assurance (QA) program. The calculation is developed in accordance with the AP-3.12Q procedure, ''Calculations''. Additional background information regarding this activity is contained in the ''Development Plan for Ventilation Pretest Predictive Calculation'' (DP) (CRWMS M&O 2000a).« less

  1. SU-F-T-489: 4-Years Experience of QA in TomoTherapy MVCT: What Do We Look Out For?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, F; Chan, K

    2016-06-15

    Purpose: To evaluate the QA results of TomoTherapy MVCT from March 2012 to February 2016, and to identify issues that may affect consistency in HU numbers and reconstructed treatment dose in MVCT. Methods: Monthly QA was performed on our TomoHD system. Phantom with rod inserts of various mass densities was imaged in MVCT and compared to baseline to evaluate HU number consistency. To evaluate treatment dose reconstructed by delivered sinogram and MVCT, a treatment plan was designed on a humanoid skull phantom. The phantom was imaged with MVCT and treatment plan was delivered to obtain the sinogram. The dose reconstructedmore » with the Planned Adaptive software was compared to the dose in the original plan. The QA tolerance for HU numbers was ±30 HU, and ±2% for discrepancy between original plan dose and reconstructed dose. Tolerances were referenced to AAPM TG148. Results: Several technical modifications or maintenance activities to the system have been identified which affected QA Results: 1) Upgrade in console system software which added a weekly HU calibration procedure; 2) Linac or MLC replacement leading to change in Accelerator Output Machine (AOM) parameters; 3) Upgrade in planning system algorithm affecting MVCT dose reconstruction. These events caused abrupt changes in QA results especially for the reconstructed dose. In the past 9 months, when no such modifications were done to the system, reconstructed dose was consistent with maximum deviation from baseline less than 0.6%. The HU number deviated less than 5HU. Conclusion: Routine QA is essential for MVCT, especially if the MVCT is used for daily dose reconstruction to monitor delivered dose to patients. Several technical events which may affect consistency of this are software changes, linac or MLC replacement. QA results reflected changes which justify re-calibration or system adjustment. In normal circumstances, the system should be relatively stable and quarterly QA may be sufficient.« less

  2. Science opportunity analyzer - a multi-mission approach to science planning

    NASA Technical Reports Server (NTRS)

    Streiffert, B. A.; Polanskey, C. A.; O'Reilly, T.; Colwell, J.

    2003-01-01

    In the past Science Planning for space missions has been comprised of using ad-hoc software toolscollected or reconstructed from previous missions, tools used by other groups who often speak a different 'technical' language or even 'the backs of envelopes'. In addition to the tools being rough, the work done with these tools often has had to be redone or at least re-entered when it came time to determine actual observations. Science Opportunity Analyzer (SOA), a Java-based application, has been built for scientists to enable them to identify/analyze observation opportunities and then, to create corresponding observation designs.

  3. Achieving Effective Risk Management Reduction Throughout Decommissioning at the Columbus Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, K.D.

    2006-07-01

    Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less

  4. ACT Plan: Technical Manual. 2013/2014

    ERIC Educational Resources Information Center

    ACT, Inc., 2013

    2013-01-01

    This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…

  5. A Guide to Systematic Planning for Vocational and Technical Schools. Research 22.

    ERIC Educational Resources Information Center

    Meckley, Richard F.; And Others

    A school planning scheme involving 46 principle activities which occur over a 38-month period is presented. This scheme was developed for individuals responsible for the planning of vocational and technical schools, i.e., supervisors, state staff, university school plant planners, architects, and local school administrators. The activities…

  6. Connected Vehicle Pilot Deployment Program phase 1 : comprehensive deployment plan : New York City : volume 1 : technical application : part I : technical and management approach.

    DOT National Transportation Integrated Search

    2016-08-01

    This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...

  7. INDOT Technical Training Plan : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...

  8. TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals

    EPA Pesticide Factsheets

    TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals -- Brominated Phthalates Cluster Flame Retardants.

  9. Planning a DSN support section technical library

    NASA Technical Reports Server (NTRS)

    Bailey, T.; Chatburn, C. C.

    1980-01-01

    The planning procedure being used to establish a technical library for the Deep Space Network support section is described. The inventory and survey methods employed are described and the preliminary results of these methods are discussed.

  10. A National Needs Assessment to Identify Technical Procedures in Vascular Surgery for Simulation Based Training.

    PubMed

    Nayahangan, L J; Konge, L; Schroeder, T V; Paltved, C; Lindorff-Larsen, K G; Nielsen, B U; Eiberg, J P

    2017-04-01

    Practical skills training in vascular surgery is facing challenges because of an increased number of endovascular procedures and fewer open procedures, as well as a move away from the traditional principle of "learning by doing." This change has established simulation as a cornerstone in providing trainees with the necessary skills and competences. However, the development of simulation based programs often evolves based on available resources and equipment, reflecting convenience rather than a systematic educational plan. The objective of the present study was to perform a national needs assessment to identify the technical procedures that should be integrated in a simulation based curriculum. A national needs assessment using a Delphi process was initiated by engaging 33 predefined key persons in vascular surgery. Round 1 was a brainstorming phase to identify technical procedures that vascular surgeons should learn. Round 2 was a survey that used a needs assessment formula to explore the frequency of procedures, the number of surgeons performing each procedure, risk and/or discomfort, and feasibility for simulation based training. Round 3 involved elimination and ranking of procedures. The response rate for round 1 was 70%, with 36 procedures identified. Round 2 had a 76% response rate and resulted in a preliminary prioritised list after exploring the need for simulation based training. Round 3 had an 85% response rate; 17 procedures were eliminated, resulting in a final prioritised list of 19 technical procedures. A national needs assessment using a standardised Delphi method identified a list of procedures that are highly suitable and may provide the basis for future simulation based training programs for vascular surgeons in training. Copyright © 2017 European Society for Vascular Surgery. Published by Elsevier Ltd. All rights reserved.

  11. Technical-Oriented Enterprise Resource Planning (ERP) Body of Knowledge for Information Systems Programs: Content and Implementation

    ERIC Educational Resources Information Center

    Boyle, Todd A.

    2007-01-01

    In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…

  12. The Birth of a New Vocational-Technical Center. National Vocational-Technical Facility Planning Conference (Las Vegas, Nevada, May, 1967).

    ERIC Educational Resources Information Center

    Farnsworth, Clayton

    The principal of the Southern Nevada Vocational-Technical Center at Las Vegas, Nevada, briefly outlines its development and function. The facility cost approximately 3 million dollars and was built on 390 acres of land purchased from the Federal government. The PERT method was used in planning. Instructional facilities, including those for auto…

  13. Ten rules for asset protection planning.

    PubMed

    Adkisson, Jay D; Keller, Lawrence B

    2013-12-01

    Asset protection planning is a highly technical area of legal planning. Because of the fraudulent transfer laws, asset protection planning must be done in advance of any claim, be technically sound, not rely upon secrecy, and avoid any number of critical mistakes including keeping personal and business assets separate. Physicians who engage in asset protection planning must avoid critical mistakes, and not count on bankruptcy to provide relief from creditors. General rules and cautions for those who are considering the creation of an asset protection plan for their personal assets.

  14. The key to successful management of STS operations: An integrated production planning system

    NASA Technical Reports Server (NTRS)

    Johnson, W. A.; Thomasen, C. T.

    1985-01-01

    Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

  15. Life sciences payloads analyses and technical program planning studies. [project planning of space missions of space shuttles in aerospace medicine and space biology

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Contractural requirements, project planning, equipment specifications, and technical data for space shuttle biological experiment payloads are presented. Topics discussed are: (1) urine collection and processing on the space shuttle, (2) space processing of biochemical and biomedical materials, (3) mission simulations, and (4) biomedical equipment.

  16. Territorial energy assessment. Phase I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-07-31

    The goal of the project is to provide a current perspective on territorial energy problems, to identify existing energy supply and demand data, and to identify energy resources that might be developed and appropriate technology options. The cost of the technical assessment and economic analysis activities required to support the development of specific energy plans is defined and estimated. Information is summarized for the US Territories, the Pacific Trust Territories, and Puerto Rico. An overview and analysis of the the Pacific Island Entities; profiles of the Pacifc Island Entities; and the Caribbean Island Entities are presented. (MCW)

  17. Ohio's statewide land use inventory: An operational approach for applying LANDSAT data to state, regional and local planning programs

    NASA Technical Reports Server (NTRS)

    Baldridge, P. E.; Geosling, P. H.; Leone, F.; Minshall, C.; Rodgers, R. H.; Wilhelm, C. L.

    1975-01-01

    The programmatic, technical, user application, and cost factors associated with the development of an operational, statewide land use inventory from LANDSAT data are described. The LANDSAT multispectral data are subjected to geometrical and categorical processing to produce map files for each of the 200 fifteen (15) minute quads covering Ohio. Computer compatible tapes are rescanned to produce inventory tapes which identify eight (8) Level I land use categories and a variety of Level II categories. The inventory tapes are processed through a series of ten (10) software programs developed by the State of Ohio. The net result is a computerized inventory which can be displayed in map or tabular form for various geographic units, at a variety of scales and for selected categories of usage. The computerized inventory data files are applied to technical programs developed by the various state agencies to be used in state, regional, and local planning programs.

  18. 32 CFR 37.420 - Should I tell proposers that we will not disclose information that they submit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... documents; and (ii) Business plans and technical information submitted on a confidential basis. (c) If proposers desire to protect business plans and technical information for five years from FOIA disclosure...

  19. 77 FR 16447 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ...: These technical amendments are effective on March 21, 2012. FOR FURTHER INFORMATION CONTACT: Doris Lo, EPA Region IX, (415) 972- 3959, lo[email protected] . SUPPLEMENTARY INFORMATION: Technical Amendment for...

  20. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  1. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  2. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  3. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  4. 7 CFR 610.32 - Technical assistance furnished.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...

  5. Geotechnical support and topical studies for nuclear waste geologic repositories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    The present report lists the technical reviews and comments made during the fiscal year 1988 and summarizes the technical progress of the topical studies. In the area of technical assistance, there were numerous activities detailed in the next section. These included 24 geotechnical support activities, including reviews of 6 Study Plans (SP) and participation in 6 SP Review Workshops, review of one whole document Site Characterization Plan (SCP) and participation in the Assembled Document SCP Review Workshops by 6 LBL reviewers; the hosting of a DOE program review, the rewriting of the project statement of work, 2 trips to technicalmore » and planning meetings; preparation of proposed work statements for two new topics for DOE, and 5 instances of technical assistance to DOE. These activities are described in a Table in the following section entitled Geoscience Technical Support for Nuclear Waste Geologic Repositories.''« less

  6. Civil tiltrotor missions and applications

    NASA Technical Reports Server (NTRS)

    Clay, Bill; Baumgaertner, Paul; Thompson, Pete; Meyer, Sam; Reber, Ron; Berry, Dennis (Editor)

    1987-01-01

    In 1983, an FAA-sponsored National Rotorcraft Program sought to identify improvements to the national interurban transportation networks and determined that conventional helicopters did not have the potential to satisfy requirements because of a lack of capacity, high operational costs, and high noise levels. Tiltrotors, it was felt offered a better potential to improve interurban air transport service. In 1985, the FAA proposed a joint civil tiltrotor study with NASA and DOD that would capitalize on development of the military V-22 tiltrotor and document the potential of the commercial tiltrotor transport market. The results of a study on the mission and application of a civil tiltrotor is presented. This study addresses national issues and includes a market summary. A technical summary provides information on six design configurations and potential risk areas are identified. The development of a National Plan for a tiltrotor transportation system is recommended including civil tiltrotor technology development, infrastructure planning and development, a flight technology demonstration plan, and near term actions.

  7. 75 FR 19677 - Medicare Program; Policy and Technical Changes to the Medicare Advantage and the Medicare...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... Care and Network-Based Private Fee-for-Service Plans Under Part C (Sec. 422.112) 7. Deemable Program... Cost by HMO/CMP Cost Contractors and Health Care Prepayment Plans (HCPPs) (Sec. 417.564) 4. Calculation... and Other Technical Changes 1. Application of Subpart M to Health Care Prepayment Plans (Sec. 417.840...

  8. Long-Range Plan for Gateway Technical Institute. 1982-1987: Serving Kenosha, Racine, and Walworth Counties.

    ERIC Educational Resources Information Center

    Stoehr, Keith W.; Covelli, Nicholas J.

    This report presents Gateway Technical Institute's long-range plan for 1982-1987. After prefatory material discussing financial and non-financial factors that may impinge on the plan, Chapter I outlines the socioeconomic situation in the three-county area of Wisconsin served by the college and introduces some of the critical issues that the…

  9. Quality Primary Care and Family Planning Services for LGBT Clients: A Comprehensive Review of Clinical Guidelines.

    PubMed

    Klein, David A; Malcolm, Nikita M; Berry-Bibee, Erin N; Paradise, Scott L; Coulter, Jessica S; Keglovitz Baker, Kristin; Schvey, Natasha A; Rollison, Julia M; Frederiksen, Brittni N

    2018-04-01

    LGBT clients have unique healthcare needs but experience a wide range of quality in the care that they receive. This study provides a summary of clinical guideline recommendations related to the provision of primary care and family planning services for LGBT clients. In addition, we identify gaps in current guidelines, and inform future recommendations and guidance for clinical practice and research. PubMed, Cochrane, and Agency for Healthcare Research and Quality electronic bibliographic databases, and relevant professional organizations' websites, were searched to identify clinical guidelines related to the provision of primary care and family planning services for LGBT clients. Information obtained from a technical expert panel was used to inform the review. Clinical guidelines meeting the inclusion criteria were assessed to determine their alignment with Institute of Medicine (IOM) standards for the development of clinical practice guidelines and content relevant to the identified themes. The search parameters identified 2,006 clinical practice guidelines. Seventeen clinical guidelines met the inclusion criteria. Two of the guidelines met all eight IOM criteria. However, many recommendations were consistent regarding provision of services to LGBT clients within the following themes: clinic environment, provider cultural sensitivity and awareness, communication, confidentiality, coordination of care, general clinical principles, mental health considerations, and reproductive health. Guidelines for the primary and family planning care of LGBT clients are evolving. The themes identified in this review may guide professional organizations during guideline development, clinicians when providing care, and researchers conducting LGBT-related studies.

  10. Chemical decontamination technical resources at Los Alamos National Laboratory (2008)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moore, Murray E

    This document supplies information resources for a person seeking to create planning or pre-planning documents for chemical decontamination operations. A building decontamination plan can be separated into four different sections: Pre-planning, Characterization, Decontamination (Initial response and also complete cleanup), and Clearance. Of the identified Los Alamos resources, they can be matched with these four sections: Pre-planning -- Dave Seidel, EO-EPP, Emergency Planning and Preparedness; David DeCroix and Bruce Letellier, D-3, Computational fluids modeling of structures; Murray E. Moore, RP-2, Aerosol sampling and ventilation engineering. Characterization (this can include development projects) -- Beth Perry, IAT-3, Nuclear Counterterrorism Response (SNIPER database); Fernandomore » Garzon, MPA-11, Sensors and Electrochemical Devices (development); George Havrilla, C-CDE, Chemical Diagnostics and Engineering; Kristen McCabe, B-7, Biosecurity and Public Health. Decontamination -- Adam Stively, EO-ER, Emergency Response; Dina Matz, IHS-IP, Industrial hygiene; Don Hickmott, EES-6, Chemical cleanup. Clearance (validation) -- Larry Ticknor, CCS-6, Statistical Sciences.« less

  11. [Plan to improve malaria control towards its elimination in Mesoamerica].

    PubMed

    Rodríguez, Mario Henry; Betanzos-Reyes, Angel Francisco

    2011-01-01

    To develop a plan to strengthen the control of malaria towards its elimination. In 2009, under the coordination of the National Public HealthInstitute ofMexico, atransdisciplinary equipment of technical and operative experts was conformed to carry out a situational analysis of malaria and control programs and for the selection of effective practices of intervention that would be incorporated to the plan, within the framework of an exercise in Theory of Change. Criteria for thestratificationof thelocalities, based ontheirtransmission characteristics were established. The structural and operative limitations of the control programs were identified. A plan of interventions was elaborated to improve the coverage of epidemiological surveillance, anti-malaria interventions and opportune diagnosis and treatment of cases. The plan delineates progressive phases of implementation: reorganization, intensification of interventions and evaluation of elimination feasibility. The adoption of a regional strategic plan will provide guidance and administrative elements to conform a system that coordinates the activities of the national control programs and facilitate the elimination of malaria in the region.

  12. River Protection Project Technology and Innovation Roadmap.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reid, D. S.; Wooley, T. A.; Kelly, S. E.

    The Technology and Innovation Roadmap is a planning tool for WRPS management, DOE ORP, DOE EM, and others to understand the risks and technology gaps associated with the RPP mission. The roadmap identifies and prioritizes technical areas that require technology solutions and underscores where timely and appropriate technology development can have the greatest impact to reduce those risks and uncertainties. The roadmap also serves as a tool for determining allocation of resources.

  13. Research Plans for Improving Understanding of Effects of Very Low-Frequency Noise of Heavy Lift Rotorcraft

    NASA Technical Reports Server (NTRS)

    Fidell, Sanford; Horonieff, Richard D.; Schmitz, Fredric H.

    2010-01-01

    This report reviews the English-language technical literature on infrasonic and low-frequency noise effects; identifies the most salient effects of noise produced by a future large civil tiltrotor aircraft on crew, passengers, and communities near landing areas; and recommends research needed to improve understanding of the effects of such noise on passengers, crew, and residents of areas near landing pads.

  14. Plow Shop Pond Supplemental Investigation Work Plan

    DTIC Science & Technology

    1994-09-01

    the results of the TIE, major contributors to sediment toxicity in Plow I Shop will be identified. Site-specific numerical criteria for contaminants in...consume Plow Shop Pond fish is less than 1.3". ABB-ES would use an available software package to generate the probability distributions. 5 If...Fort Devens project. The Project Manager is responsible for confirming the appropriateness and adequacy of the technical or engineering services

  15. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Urban, Mary Elizabeth

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less

  16. Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chartock, Mike; Hansen, Todd

    1999-08-01

    The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategicmore » management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.« less

  17. Space Station RT and E Utilization Study

    NASA Technical Reports Server (NTRS)

    Wunsch, P. K.; Anderson, P. H.

    1989-01-01

    Descriptive information on a set of 241 mission concepts was reviewed to establish preliminary Space Station outfitting needs for technology development missions. The missions studied covered the full range of in-space technology development activities envisioned for early Space Station operations and included both pressurized volume and attached payload requirements. Equipment needs were compared with outfitting plans for the life sciences and microgravity user communities, and a number of potential outfitting additions were identified. Outfitting implementation was addressed by selecting a strawman mission complement for each of seven technical themes, by organizing the missions into flight scenarios, and by assessing the associated outfitting buildup for planning impacts.

  18. Housing, health and master planning: rules of engagement.

    PubMed

    Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P

    2014-04-01

    Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.

  19. 10 CFR 603.420 - Disclosure of information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... types that are exempt: (i) Proposals, proposal abstracts, and supporting documents; and (ii) Business plans and technical information submitted on a confidential basis. (c) If proposers desire to protect business plans and technical information for five years from FOIA disclosure requirements, they must mark...

  20. Transportation Network Data Requirements for Assessing Criticality for Resiliency and Adaptation Planning

    DOT National Transportation Integrated Search

    2017-11-01

    This report is one of two NCST Research Report documents produced as part of a project to advance the technical modeling tools for resiliency and adaptation planning, especially those used for criticality rankings. The official final technical report...

  1. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  2. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  3. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  4. 25 CFR 1000.68 - May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its planning...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...

  5. Integrated corridor management initiative : demonstration phase evaluation – Dallas technical capability analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...

  6. Annual Report of the Metals and Ceramics Information Center, 1 May 1979-30 April 1980.

    DTIC Science & Technology

    1980-07-01

    MANAGEMENT AND ECONOMIC ANALYSIS DEPT. * Computer and Information SyslemsiD. C Operations 1 Battelle Technical Inputs to Planning * Computer Systems 0...Biomass Resources * Education 0 Business Planning * Information Systems * Economics , Planning and Policy Analysis * Statistical and Mathematical Modelrng...Metals and Ceramics Information Center (MCIC) is one of several technical information analysis centers (IAC’s) chartered and sponsored by the

  7. Career Opportunities in Texas: A Master Plan for Vocational and Technical Education (1989 Update).

    ERIC Educational Resources Information Center

    Texas State Board of Education, Austin.

    In January 1987, a Master Plan for the delivery of vocational and technical education in Texas was adopted by the State Board of Education (SBOE). The master plan details goals and strategies to assist in the development of a skilled and educated work force in Texas as the state enters the 21st century. As part of their mandated annual review…

  8. 2013 Technical Roundtable

    EPA Pesticide Factsheets

    On December 9, 2013, EPA reconvened the study’s Technical Roundtable. Subject-matter experts discussed the outcomes of the 2013 Technical Workshops, stakeholder engagement, and plans for draft assessment report.

  9. Does service integration improve technical quality of care in low-resource settings? An evaluation of a model integrating HIV care into family planning services in Kenya

    PubMed Central

    Mutemwa, Richard; Mayhew, Susannah H; Warren, Charlotte E; Abuya, Timothy; Ndwiga, Charity; Kivunaga, Jackline

    2017-01-01

    Abstract The aim of this study was to investigate association between HIV and family planning integration and technical quality of care. The study focused on technical quality of client–provider consultation sessions. The cross-sectional study observed 366 client–provider consultation sessions and interviewed 37 health care providers in 12 public health facilities in Kenya. Multilevel random intercept and linear regression models were fitted to the matched data to investigate relationships between service integration and technical quality of care as well as associations between facility-level structural and provider factors and technical quality of care. A sensitivity analysis was performed to test for hidden bias. After adjusting for facility-level structural factors, HIV/family planning integration was found to have significant positive effect on technical quality of the consultation session, with average treatment effect 0.44 (95% CI: 0.63–0.82). Three of the 12 structural factors were significantly positively associated with technical quality of consultation session including: availability of family planning commodities (9.64; 95% CI: 5.07–14.21), adequate infrastructure (5.29; 95% CI: 2.89–7.69) and reagents (1.48; 95% CI: 1.02–1.93). Three of the nine provider factors were significantly positively associated with technical quality of consultation session: appropriate provider clinical knowledge (3.14; 95% CI: 1.92–4.36), job satisfaction (2.02; 95% CI: 1.21–2.83) and supervision (1.01; 95% CI: 0.35–1.68), while workload (−0.88; 95% CI: −1.75 to − 0.01) was negatively associated. Technical quality of the client–provider consultation session was also determined by duration of the consultation and type of clinic visit and appeared to depend on whether the clinic visit occurred early or later in the week. Integration of HIV care into family planning services can improve the technical quality of client–provider consultation sessions as measured by both health facility structural and provider factors. PMID:29194543

  10. Does service integration improve technical quality of care in low-resource settings? An evaluation of a model integrating HIV care into family planning services in Kenya.

    PubMed

    Mutemwa, Richard; Mayhew, Susannah H; Warren, Charlotte E; Abuya, Timothy; Ndwiga, Charity; Kivunaga, Jackline

    2017-11-01

    The aim of this study was to investigate association between HIV and family planning integration and technical quality of care. The study focused on technical quality of client-provider consultation sessions. The cross-sectional study observed 366 client-provider consultation sessions and interviewed 37 health care providers in 12 public health facilities in Kenya. Multilevel random intercept and linear regression models were fitted to the matched data to investigate relationships between service integration and technical quality of care as well as associations between facility-level structural and provider factors and technical quality of care. A sensitivity analysis was performed to test for hidden bias. After adjusting for facility-level structural factors, HIV/family planning integration was found to have significant positive effect on technical quality of the consultation session, with average treatment effect 0.44 (95% CI: 0.63-0.82). Three of the 12 structural factors were significantly positively associated with technical quality of consultation session including: availability of family planning commodities (9.64; 95% CI: 5.07-14.21), adequate infrastructure (5.29; 95% CI: 2.89-7.69) and reagents (1.48; 95% CI: 1.02-1.93). Three of the nine provider factors were significantly positively associated with technical quality of consultation session: appropriate provider clinical knowledge (3.14; 95% CI: 1.92-4.36), job satisfaction (2.02; 95% CI: 1.21-2.83) and supervision (1.01; 95% CI: 0.35-1.68), while workload (-0.88; 95% CI: -1.75 to - 0.01) was negatively associated. Technical quality of the client-provider consultation session was also determined by duration of the consultation and type of clinic visit and appeared to depend on whether the clinic visit occurred early or later in the week. Integration of HIV care into family planning services can improve the technical quality of client-provider consultation sessions as measured by both health facility structural and provider factors. © The Author 2017. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine.

  11. Structural dynamics division research and technology accomplishments for FY 1993 and plans for FY 1994

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1994-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  12. Structural dynamics division research and technology accomplishments for FY 1989 and plans for FY 1990

    NASA Technical Reports Server (NTRS)

    Smith, Jacqueline G.; Gardner, James E.

    1990-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  13. Loads and aeroelasticity division research and technology accomplishments for FY 1985 and plans for FY 1986

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1986-01-01

    The Langley Research Center Loads and Aeroelasticity Division's research accomplishments for FY85 and research plans for FY86 are presented. The rk under each branch (technical area) will be described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  14. Loads and Aeroelasticity Division research and technology accomplishments for FY 1986 and plans for FY 1987

    NASA Technical Reports Server (NTRS)

    Gardner, James E.; Dixon, S. C.

    1987-01-01

    The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  15. Phase I Investigations at the Former CCC/USDA Grain Storage Facility in Montgomery City, Missouri, in 2010-2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    This report presents the technical findings of Phase I of Argonne’s studies. The Phase I field investigation was initiated on October 18, 2010. The work was conducted in accord with (1) the final site-specific Phase I Work Plan for Montgomery City (Argonne 2010; approved by the MDNR [2010]); (2) applicable Missouri regulations; and (3) the standard operating procedures, quality assurance/quality control (QA/QC) measures, and general health and safety policies outlined in the Master Work Plan (Argonne 2002) for operations in Kansas, which was reviewed by the MDNR and accepted for current use. A draft master plan specific to work inmore » Missouri and a set of draft standard operating procedures are in review with the MDNR. The site-specific Work Plan for Montgomery City (Argonne 2010) (1) summarizes the pre-existing knowledge base for the Montgomery City investigation site compiled by Argonne and (2) describes the site-specific technical objectives and the intended scope of work developed for the first phase of the investigation. Three primary technical objectives were identified for the Phase I studies, as follows: 1. Update the presently identified inventory and status of private and public drinking water wells in the immediate vicinity of the former CCC/USDA grain storage facility, and sample the identified wells for volatile organic compounds (VOCs) and geochemical analyses. In conjunction with this effort, determine the present sources(s) of drinking water for all residents in an approximate 0.5-mi radius of the former CCC/USDA facility. 2. Investigate for possible evidence of a soil source of carbon tetrachloride contamination in the unconsolidated sediments beneath the former CCC/USDA facility that might affect the underlying bedrock aquifer units. 3. Obtain preliminary information on the site-specific lithologic and hydrologic characteristics of the unconsolidated sediments overlying bedrock at the former CCC/USDA grain storage location. Section 2 of this report describes the investigative methods used in the 2010-2011 studies and provides a chronological summary of the field events conducted. Section 3 presents a summary of the resulting field and laboratory data. These data, together with information presented in the site-specific Work Plan (Argonne 2010), are interpreted and integrated in Section 4 to (1) develop a preliminary conceptual model of the hydrogeologic framework affecting groundwater and potential contaminant migration in the vicinity of the former CCC/USDA facility and (2) serve as a basis for the initial consideration of contaminant levels and potential exposure pathways that might be of concern in the evaluation of risks to human health, public welfare, and the environment. The working conclusions drawn from the 2010-2011 studies are presented, along with recommendations, in Section 5.« less

  16. Staff Considerations in Technical Services: The Chameleon Approach.

    ERIC Educational Resources Information Center

    Foster, Constance L.

    1988-01-01

    Discusses the need to cope effectively with technological transitions in library technical services and to plan for successful staff development. The areas discussed include changing job skills, financial planning, ergonomics, innovative partnerships, training, and an emphasis on human resources development. (21 references) (Author/CLB)

  17. Waste Receiving and Processing (WRAP) Module 1 Hazards Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CAMPBELL, L.R.

    1999-09-29

    This document establishes the technical basis in support of Emergency Planning activities for the WRAP Module 1 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone is demonstrated.

  18. 7 CFR 1468.9 - Conservation farm plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Prior to contract approval, a conservation farm plan must be written and approved. In deciding whether... applicable NRCS field office technical guide or as approved by the State Conservationist. (e) Participants... participant's request, the NRCS may provide technical assistance to a participant. (1) Participants may, at...

  19. Integrating Science with Technical and Vocational Areas.

    ERIC Educational Resources Information Center

    Snyder, Larry; Shreckengast, Craig

    This guide presents learning activities and lesson plans that integrate science with technical and vocational areas. Activities and plans are organized under broad headings such as Environmental Science and Acid Rain Research; Criminal Justice, Chemistry, and Narcotics; Children's Education and Services; Cosmetology; and Health Professions.…

  20. Technical and Occupational Shops.

    ERIC Educational Resources Information Center

    Ontario Dept. of Education, Toronto. School Planning and Building Research Section.

    This booklet presents suggested plans and specifications for and discusses facilities common to technical and occupational shops. Drawings, room plans, and text illustrate specifications for drafting rooms, a welding shop, an automechanics shop, an auto body shop, and a high school greenhouse. Also included are facility designs for agricultural…

  1. Dengue Contingency Planning: From Research to Policy and Practice.

    PubMed

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J; Sánchez Tejeda, Gustavo; Lloyd, Linda S; Hakim, Lokman; Bowman, Leigh R; Horstick, Olaf; Coelho, Giovanini

    2016-09-01

    Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan.

  2. 32 CFR 203.10 - Eligible activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...

  3. 32 CFR 203.10 - Eligible activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...

  4. 32 CFR 203.10 - Eligible activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...

  5. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  6. Analysis of The Planning Education in the Light of the Contemporary Trends in Planning

    NASA Astrophysics Data System (ADS)

    Husar, Milan; Ceren Varis, Sila; Ondrejicka, Vladimir

    2017-12-01

    This paper examines the way the planning education is taught and examines the recent trends in the curricula of planning education institutions. The introduction of changing economic systems and planning in the field of education is discussed against these changes. Additionally, the evolution in the planner’s role and how it affects the planning education is discussed. The paper is addressing trends and challenges the countries and their planning changes are facing in 21st century. The trends such as increasing globalization, fuzziness of spatial structures and their borders, complexity and uncertainty and the growing interconnectedness of the world are discussed. Another aim is to prepare a common ground, a platform at the university level for scientific cooperation in the field of planning. This study aims at examining the situation of planning in the contemporary world. The identified challenges include the need for more flexibility in planning and planning education, the emergence of innovations and creativity in planners and planning projects, the necessity of promoting soft skills while keeping the existing technical nature of planning and lastly, the need for more interdisciplinary work. The final part of the paper is discussing the future planning education and recommendations on how the schools of planning should reflect these changes.

  7. Evaluation of the Effectiveness of Stormwater Decision Support Tools for Infrastructure Selection and the Barriers to Implementation

    NASA Astrophysics Data System (ADS)

    Spahr, K.; Hogue, T. S.

    2016-12-01

    Selecting the most appropriate green, gray, and / or hybrid system for stormwater treatment and conveyance can prove challenging to decision markers across all scales, from site managers to large municipalities. To help streamline the selection process, a multi-disciplinary team of academics and professionals is developing an industry standard for selecting and evaluating the most appropriate stormwater management technology for different regions. To make the tool more robust and comprehensive, life-cycle cost assessment and optimization modules will be included to evaluate non-monetized and ecosystem benefits of selected technologies. Initial work includes surveying advisory board members based in cities that use existing decision support tools in their infrastructure planning process. These surveys will qualify the decisions currently being made and identify challenges within the current planning process across a range of hydroclimatic regions and city size. Analysis of social and other non-technical barriers to adoption of the existing tools is also being performed, with identification of regional differences and institutional challenges. Surveys will also gage the regional appropriateness of certain stormwater technologies based off experiences in implementing stormwater treatment and conveyance plans. In additional to compiling qualitative data on existing decision support tools, a technical review of components of the decision support tool used will be performed. Gaps in each tool's analysis, like the lack of certain critical functionalities, will be identified and ease of use will be evaluated. Conclusions drawn from both the qualitative and quantitative analyses will be used to inform the development of the new decision support tool and its eventual dissemination.

  8. Challenges of deploying nuclear energy for power generation in Malaysia

    NASA Astrophysics Data System (ADS)

    Jaafar, Mohd Zamzam; Nazaruddin, Nurul Huda; Lye, Jonathan Tan Thiam

    2017-01-01

    Under the 10th Malaysia Plan (2010-2015) and the Economic Transformation Programme (ETP), nuclear energy was identified as a potential long-term option to be explored for electricity generation in Peninsular Malaysia. The energy sector in Malaysia currently faces several concerns including depleting domestic gas supply which will affect security and reliability of supply as well as overdependance on fossil fuels - mainly gas and imported coal, and nuclear energy may offer a possible solution to these issues as well as global climate change concern. Pursuing the nuclear option, Malaysia Nuclear Power Corporation (MNPC) is undertaking a series of comprehensive studies to facilitate an informed Government decision on the matter. This paper aims to discuss the many challenges towards the peaceful use of nuclear energy for electricity generation in the context of the New Energy Policy 2010 to achieve a balanced and sustainable energy mix. This effort will continue in the 11th Malaysia Plan (2016-2020) with emphasis on implementing a comprehensive communications plan and public awareness programme for the potential use of nuclear energy in the future. In analysing the challenges for the development of nuclear energy in Malaysia, the traditional triple bottom line (TBL) framework for sustainability, encompassing economic, social and environmental objectives is utilized. An additional factor, technical, is also included in the analysis to provide a more holistic view. It is opined that the main challenges of developing nuclear energy for electricity generation in a newcomer country like Malaysia can be attributed primarily to domestic non-technical factors compared to the technical factor.

  9. Vision for the Year 2002: A Working Document. Salem County Board for Vocational Education Strategic Plan for the Salem County Vocational Technical Schools.

    ERIC Educational Resources Information Center

    Salem County Board for Vocational Education, Woodstown, NJ.

    A strategic plan for vocational-technical education (VTE) in Salem County, New Jersey, in the year 2002 was developed by the county board of VTE and county advisory board with input from students, parents, employers, elected officials, and the community in general. Six strategic planning subcommittees were formed to review the district's VTE…

  10. Information transfer satellite concept study. Volume 2: Technical

    NASA Technical Reports Server (NTRS)

    Bergin, P.; Kincade, C.; Kurpiewski, D.; Leinhaupel, F.; Millican, F.; Onstad, R.

    1971-01-01

    The ITS concept study is preceded by two requirements studies whose primary objectives are to identify viable demands and to develop the functional requirements associated with these demands. In addition to continuing this basic activity the ITS concept study objectives are to: (1) develop tools and techniques for planning advanced information transfer satellite communications systems, and to (2) select viable systems for further analysis both in their near-term and in the far-term aspects.

  11. Small business innovation research: Program solicitation

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This, the seventh annual SBIR solicitation by NASA, describes the program, identifies eligibility requirements, outlines the required proposal format and content, states proposal preparation and submission requirements, describes the proposal evaluation and award selection process, and provides other information to assist those interested in participating in NASA's SBIR program. It also identifies the Technical Topics and Subtopics in which SBIR Phase 1 proposals are solicited in 1989. These Topics and Subtopics cover a broad range of current NASA interests, but do not necessarily include all areas in which NASA plans or currently conducts research. High-risk high pay-off innovations are desired.

  12. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Jun

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less

  13. Succession Planning for Management Staff at a Western Canadian Postsecondary Technical Institute.

    ERIC Educational Resources Information Center

    Cembrowski, Barbara Joan; da Costa, Jose L.

    This study used naturalistic inquiry to gain an understanding of how managerial personnel perceived career development and succession planning at a postsecondary technical institute in Canada. A total of nine individuals in three different career development stages completed semistructured interviews. It was found that managers perceived the…

  14. Succession Planning for Management Staff at a Canadian Post Secondary Technical Institute.

    ERIC Educational Resources Information Center

    da Costa, Jose; Cembrowski, Barbara

    2001-01-01

    Analyzed interviews to explore how nine administrators, at three different career stages, perceived career-development and succession planning at a Canadian postsecondary technical institute. Managers attribute career success to possession of varied personal attributes, diverse work experiences, serendipity, and a fulfilling work environment. Job…

  15. Chattanooga State Technical Community College Marketing Plan 1981-82.

    ERIC Educational Resources Information Center

    Hoppe, Sherry; Haddock, David

    Chattanooga State Technical Community College's (CSTCC's) marketing plan is presented in six parallel sections. The first of these deals with building the overall image of the college, increasing community awareness, and disseminating general information. The other five sections focus on marketing the following college programs and services:…

  16. 77 FR 19280 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will...-time and day-ahead market efficiency through improved software. A detailed agenda with the list of and...

  17. A Technical Evaluation of the First Stage of the Mediterranean Regional Project.

    ERIC Educational Resources Information Center

    Hollister, Robinson

    Objectives of this technical evaluation concerning the transfer of experience in the development of human resources were to develop educational plans based upon comprehensive estimates of manpower requirements and to evaluate the methods used in estimating manpower requirements for educational planning. The methodology involved estimates of the…

  18. 76 FR 28022 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will... for increasing real-time and day-ahead market efficiency through improved software. This conference...

  19. Development of Cooperative Planning for Technical-Vocational Programs.

    ERIC Educational Resources Information Center

    Cisco Junior Coll., TX.

    During the past decade vocational-technical education in Texas has grown so rapidly that now attention must be given to enrollments, employment projections, and more efficient utilization of the limited resources available. Cisco and Ranger Junior Colleges serve essentially the same population and a plan for close cooperation and coordination is…

  20. 40 CFR 52.460 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business stationary source... PLANS Delaware § 52.460 Small business stationary source technical and environmental compliance... Environmental Control submitted a plan for the establishment and implementation of a Small Business Stationary...

  1. [Mesoamerican Public Health Institute: technical support and capacity strengthening arm of the Mesoamerican Public Health System].

    PubMed

    González-Block, Miguel A; Molina-Rodríguez, Juan Francisco; Becerril, Víctor; Vargas, Emily

    2011-01-01

    The Mesoamerican Public Health Institute (IMSP) was constituted in 2009 as the technical organ of the Mesoamerican Public Health System (SMSP) and the Virtual Network of Academic Institutions. Health system capacity strengthening needs and preliminary training results were assessed in the first phase. The SMSP Master Plans were content-analyzed for each priority and members of the Malaria and Dengue Working Group were surveyed. The training needs required for each SMSP priority area were identified and knowledge management needs for malaria and dengue analyzed. Competencies were mapped across strategic, tactical and operative personnel that will be requiring them. IMSP trained in its first year 91 persons in eight countries. IMSP is responding to the Mesoamerican region's public health needs.

  2. User acceptability--a critical success factor for picture archiving and communication system implementation.

    PubMed

    Crivianu-Gaita, D; Babyn, P; Gilday, D; O'Brien, B; Charkot, E

    2000-05-01

    The Department of Diagnostic Imaging at the Hospital for Sick Children (HSC), Toronto, implemented a picture archiving and communication system (PACS) during the last year. This report describes our experience from the point of view of user acceptability. Based on objective data, the following key success factors were identified: user involvement in PACS planning, training, technical support, and rollout of pilot projects. Although technical factors are critical and must be addressed, the main conclusion of our study is that other nontechnical factors need to be recognized and resolved. Recognition of the importance of these factors to user acceptance and clear communication and consultation will help reduce negative user attitudes and increase the chance of a successful PACS implementation.

  3. Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 1B: Concise review

    NASA Technical Reports Server (NTRS)

    Miller, R. E., Jr.; Southall, J. W.; Kawaguchi, A. S.; Redhed, D. D.

    1973-01-01

    Reports on the design process, support of the design process, IPAD System design catalog of IPAD technical program elements, IPAD System development and operation, and IPAD benefits and impact are concisely reviewed. The approach used to define the design is described. Major activities performed during the product development cycle are identified. The computer system requirements necessary to support the design process are given as computational requirements of the host system, technical program elements and system features. The IPAD computer system design is presented as concepts, a functional description and an organizational diagram of its major components. The cost and schedules and a three phase plan for IPAD implementation are presented. The benefits and impact of IPAD technology are discussed.

  4. Development of a rapid response plan for intraoperative emergencies: the Circulate, Scrub, and Technical Assistance Team.

    PubMed

    Earle, David; Betti, Diane; Scala, Emilia

    2017-01-01

    Unplanned intraoperative events are inevitable and cause stress and inefficiency among staff. We believe that developing a technical rapid response team with explicitly defined, narrow roles would reduce the amount of chaos during such emergencies. This article provides a detailed description of the development and implementation of such a program. In-situ simulation of an intraoperative emergency was used for a formal assessment of the current practice. Debriefing sessions identified areas of improvement and solicited solutions. A multidisciplinary working group then developed and implemented the technical rapid response team based on the needs assessment. The program was designed to create a Circulating, Scrubbing, and Technical Assistance Team that helps with equipment, supplies, anesthesia, and communication. We anticipate the program will foster a culture of safety, and promote positive relationships and attitudes of the entire multidisciplinary team. In the future, research regarding patient outcomes and staff satisfaction and safety attitudes may help provide objective evidence of the benefits of the program. Copyright © 2016 Elsevier Inc. All rights reserved.

  5. Very large hadron collider (VLHC)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-09-01

    A VLHC informal study group started to come together at Fermilab in the fall of 1995 and at the 1996 Snowmass Study the parameters of this machine took form. The VLHC as now conceived would be a 100 TeV hadron collider. It would use the Fermilab Main Injector (now nearing completion) to inject protons at 150 GeV into a new 3 TeV Booster and then into a superconducting pp collider ring producing 100 TeV c.m. interactions. A luminosity of {approximately}10{sup 34} cm{sup -2}s{sup -1} is planned. Our plans were presented to the Subpanel on the Planning for the Future ofmore » US High- Energy Physics (the successor to the Drell committee) and in February 1998 their report stated ``The Subpanel recommends an expanded program of R&D on cost reduction strategies, enabling technologies, and accelerator physics issues for a VLHC. These efforts should be coordinated across laboratory and university groups with the aim of identifying design concepts for an economically and technically viable facility`` The coordination has been started with the inclusion of physicists from Brookhaven National Laboratory (BNL), Lawrence Berkeley National Laboratory (LBNL), and Cornell University. Clearly, this collaboration must expanded internationally as well as nationally. The phrase ``economically and technically viable facility`` presents the real challenge.« less

  6. Structural dynamics division research and technology accomplishments for FY 1992 and plans for FY 1993

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1993-01-01

    The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  7. Loads and aeroelasticity division research and technology accomplishments for FY 1987 and plans for FY 1988

    NASA Technical Reports Server (NTRS)

    Dixon, S. C.; Gardner, James E.

    1988-01-01

    The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  8. Engineering and Industrial Fields. Revised Summary Report: Technical Employment in Northeast Florida.

    ERIC Educational Resources Information Center

    Baker, William E.; And Others

    The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in engineering and industrial fields. A…

  9. Agriculture and Related Businesses. Revised Summary Report: Technical Employment in Northeast Florida.

    ERIC Educational Resources Information Center

    Baker, William E.; And Others

    The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in agriculture and related businesses. A…

  10. Health Related Occupations. Revised Summary Report: Technical Employment in Northeast Florida.

    ERIC Educational Resources Information Center

    Baker, William E.; And Others

    The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in health related occupations. A three-phase…

  11. Securing the High Ground: Dominant Combat Air Force for America. 2008 Combat Air Force Strategic Plan

    DTIC Science & Technology

    2008-07-28

    continue to be beyond our technical ability to realize aggresively pursue advanced technical solutions to stay at the leading edge of technological...inherent to each caf Way and to seek continual improvement through exploration of innovative concepts, advanced capabilities, game -changing...available online at the air force portal: https://wwwd.my.af.mil/afknprod/strat_plan COMBAT AIR FORCE STRATEGIC PLAN Points of Contact securing the high

  12. Loads and Aeroelasticity Division research and technology accomplishments for FY 1984 and plans for FY 1985

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1985-01-01

    The loads and aeroelasticity divisions research accomplishments are presented. The work under each branch or technical area, described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  13. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  14. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  15. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  16. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  17. 40 CFR 52.2586 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...

  18. Three-dimensional-printed cardiac prototypes aid surgical decision-making and preoperative planning in selected cases of complex congenital heart diseases: Early experience and proof of concept in a resource-limited environment.

    PubMed

    Kappanayil, Mahesh; Koneti, Nageshwara Rao; Kannan, Rajesh R; Kottayil, Brijesh P; Kumar, Krishna

    2017-01-01

    Three-dimensional. (3D) printing is an innovative manufacturing process that allows computer-assisted conversion of 3D imaging data into physical "printouts" Healthcare applications are currently in evolution. The objective of this study was to explore the feasibility and impact of using patient-specific 3D-printed cardiac prototypes derived from high-resolution medical imaging data (cardiac magnetic resonance imaging/computed tomography [MRI/CT]) on surgical decision-making and preoperative planning in selected cases of complex congenital heart diseases (CHDs). Five patients with complex CHD with previously unresolved management decisions were chosen. These included two patients with complex double-outlet right ventricle, two patients with criss-cross atrioventricular connections, and one patient with congenitally corrected transposition of great arteries with pulmonary atresia. Cardiac MRI was done for all patients, cardiac CT for one; specific surgical challenges were identified. Volumetric data were used to generate patient-specific 3D models. All cases were reviewed along with their 3D models, and the impact on surgical decision-making and preoperative planning was assessed. Accurate life-sized 3D cardiac prototypes were successfully created for all patients. The models enabled radically improved 3D understanding of anatomy, identification of specific technical challenges, and precise surgical planning. Augmentation of existing clinical and imaging data by 3D prototypes allowed successful execution of complex surgeries for all five patients, in accordance with the preoperative planning. 3D-printed cardiac prototypes can radically assist decision-making, planning, and safe execution of complex congenital heart surgery by improving understanding of 3D anatomy and allowing anticipation of technical challenges.

  19. 10 CFR 905.40 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Technical assistance. 905.40 Section 905.40 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Energy Services § 905.40 Technical assistance. Western shall establish a program that provides technical assistance to customers to conduct integrated...

  20. An expert-based approach to forest road network planning by combining Delphi and spatial multi-criteria evaluation.

    PubMed

    Hayati, Elyas; Majnounian, Baris; Abdi, Ehsan; Sessions, John; Makhdoum, Majid

    2013-02-01

    Changes in forest landscapes resulting from road construction have increased remarkably in the last few years. On the other hand, the sustainable management of forest resources can only be achieved through a well-organized road network. In order to minimize the environmental impacts of forest roads, forest road managers must design the road network efficiently and environmentally as well. Efficient planning methodologies can assist forest road managers in considering the technical, economic, and environmental factors that affect forest road planning. This paper describes a three-stage methodology using the Delphi method for selecting the important criteria, the Analytic Hierarchy Process for obtaining the relative importance of the criteria, and finally, a spatial multi-criteria evaluation in a geographic information system (GIS) environment for identifying the lowest-impact road network alternative. Results of the Delphi method revealed that ground slope, lithology, distance from stream network, distance from faults, landslide susceptibility, erosion susceptibility, geology, and soil texture are the most important criteria for forest road planning in the study area. The suitability map for road planning was then obtained by combining the fuzzy map layers of these criteria with respect to their weights. Nine road network alternatives were designed using PEGGER, an ArcView GIS extension, and finally, their values were extracted from the suitability map. Results showed that the methodology was useful for identifying road that met environmental and cost considerations. Based on this work, we suggest future work in forest road planning using multi-criteria evaluation and decision making be considered in other regions and that the road planning criteria identified in this study may be useful.

  1. Challenges in building intelligent systems for space mission operations

    NASA Technical Reports Server (NTRS)

    Hartman, Wayne

    1991-01-01

    The purpose here is to provide a top-level look at the stewardship functions performed in space operations, and to identify the major issues and challenges that must be addressed to build intelligent systems that can realistically support operations functions. The focus is on decision support activities involving monitoring, state assessment, goal generation, plan generation, and plan execution. The bottom line is that problem solving in the space operations domain is a very complex process. A variety of knowledge constructs, representations, and reasoning processes are necessary to support effective human problem solving. Emulating these kinds of capabilities in intelligent systems offers major technical challenges that the artificial intelligence community is only beginning to address.

  2. Clinical utility of time-resolved imaging of contrast kinetics (TRICKS) magnetic resonance angiography for infrageniculate arterial occlusive disease.

    PubMed

    Mell, Matthew; Tefera, Girma; Thornton, Frank; Siepman, David; Turnipseed, William

    2007-03-01

    The diagnostic accuracy of magnetic resonance angiography (MRA) in the infrapopliteal arterial segment is not well defined. This study evaluated the clinical utility and diagnostic accuracy of time-resolved imaging of contrast kinetics (TRICKS) MRA compared with digital subtraction contrast angiography (DSA) in planning for percutaneous interventions of popliteal and infrapopliteal arterial occlusive disease. Patients who underwent percutaneous lower extremity interventions for popliteal or tibial occlusive disease were identified for this study. Preprocedural TRICKS MRA was performed with 1.5 Tesla (GE Healthcare, Waukesha, Wis) magnetic resonance imaging scanners with a flexible peripheral vascular coil, using the TRICKS technique with gadodiamide injection. DSA was performed using standard techniques in angiography suite with a 15-inch image intensifier. DSA was considered the gold standard. The MRA and DSA were then evaluated in a blinded fashion by a radiologist and a vascular surgeon. The popliteal artery and tibioperoneal trunk were evaluated separately, and the tibial arteries were divided into proximal, mid, and distal segments. Each segment was interpreted as normal (0% to 49% stenosis), stenotic (50% to 99% stenosis), or occluded (100%). Lesion morphology was classified according to the TransAtlantic Inter-Society Consensus (TASC). We calculated concordance between the imaging studies and the sensitivity and specificity of MRA. The clinical utility of MRA was also assessed in terms of identifying arterial access site as well as predicting technical success of the percutaneous treatment. Comparisons were done on 150 arterial segments in 30 limbs of 27 patients. When evaluated by TASC classification, TRICKS MRA correlated with DSA in 83% of the popliteal and in 88% of the infrapopliteal segments. MRA correctly identified significant disease of the popliteal artery with a sensitivity of 94% and a specificity of 92%, and of the tibial arteries with a sensitivity of 100% and specificity of 84%. When used to evaluate for stenosis vs occlusion, MRA interpretation agreed with DSA 90% of the time. Disagreement occurred in 15 arterial segments, most commonly in distal tibioperoneal arteries. MRA misdiagnosed occlusion for stenosis in 11 of 15 segments, and stenosis for occlusion in four of 15 segments. Arterial access was accurately planned based on preprocedural MRA findings in 29 of 30 patients. MRA predicted technical success 83% of the time. Five technical failures were due to inability to cross arterial occlusions, all accurately identified by MRA. TRICKS MRA is an accurate method of evaluating patients for popliteal and infrapopliteal arterial occlusive disease and can be used for planning percutaneous interventions.

  3. Potential Alternatives Report for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes

    NASA Technical Reports Server (NTRS)

    Lewis, pattie

    2011-01-01

    Identifying and selecting alternative materials and technologies that have the potential to reduce the identified HazMats and hazardous air pollutants (HAPs), while incorporating sound corrosion prevention and control technologies, is a complicated task due to the fast pace at which new technologies emerge and rules change. The alternatives are identified through literature searches, electronic database and Internet searches, surveys, and/or personal and professional contacts. Available test data was then compiled on the proposed alternatives to determine if the materials meet the test objectives or if further)laboratory or field-testing will be required. After reviewing technical information documented in the PAR, government representatives, technical representatives from the affected facilities, and other stakeholders involved in the process will select the list of viable alternative coatings for consideration and testing under the project's Joint Test Protocol entitled Joint Test Protocol for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes and Field Test Plan entitled Field Evaluations Test Plan for Validation of Alternatives to Aliphatic Isocyanate Polyurethanes, both prepared by ITB. Test results will be reported in a Joint Test Report upon completion oftesting. The selection rationale and conclusions are documented in this PAR. A cost benefit analysis will be prepared to quantify the estimated capital and process costs of coating alternatives and cost savings relative to the current coating processes, however, some initial cost data has been included in this PAR. For this coatings project, isocyanates, as found in aliphatic isocyanate polyurethanes, were identified as the target HazMat to be eliminated. Table 1-1 lists the target HazMats, the related process and application, current specifications, and affected programs.

  4. National Action Plan on Superconductivity Research and Development

    NASA Astrophysics Data System (ADS)

    1989-12-01

    The Superconductivity Action Plan pursuant to the Superconductivity and Competitiveness Act of 1988 is presented. The plan draws upon contributions from leaders in the technical community of the Federal Government responsible for research and development in superconductivity programs, as well as from the report of the Committee to Advise the President on Superconductivity. Input from leaders in the private sector was obtained during the formulation and review of the plan. Some contents: Coordination of the plan; Technical areas (high temperature superconductivity materials in general, high temperature superconductivity films for sensors and electronics, magnets, large area high temperature superconductivity films, bulk conductors); and Policy areas.

  5. Educational Reform and the World of Work: Italy

    ERIC Educational Resources Information Center

    von Blumenthal, Viktor

    1977-01-01

    One of a four-issue series on educational reform and the world of work in Europe, this issue discusses educational planning and secondary school reform in Italy. Topics discussed include planning and research in vocational-technical education, and the relation between acquisition of specific skills and scientific and technical progress. (Author/DB)

  6. Strategic Planning in a Government Organization: The Experience of the Technical Information Division at NRaD.

    ERIC Educational Resources Information Center

    Cathcart, Margaret E.

    1997-01-01

    Describes development of strategic objectives at the Research, Development, Test, and Evaluation Division of the Naval Command, Control and Ocean Surveillance Center (NRaD). Discusses its plan to achieve these objectives. States that the organization's responsibilities span the continuum of information using technical communication skills. Uses…

  7. A Strategic Plan for Texas State Technical Institute.

    ERIC Educational Resources Information Center

    Texas State Technical Inst., Waco.

    Following two decades of growth, both enrollment and funding at the Texas State Technical Institute (TSTI) have declined sharply over the last 5 years. In April 1989, the TSTI initiated a strategic planning process incorporating a strategy based on meeting a clearly recognized and understood public need that is within the role, scope, and mission…

  8. Nevada State Five-Year Plan: July 1, 2008 through June 30, 2013

    ERIC Educational Resources Information Center

    Nevada Department of Education, 2008

    2008-01-01

    With the recent enactment of the Carl D. Perkins Career and Technical Education Act of 2006, Congress has demonstrated overwhelming bipartisan support to continue the country's federal investment in career and technical education. This document, the "Nevada State Five-Year Plan for the Carl D. Perkins Act of 2006," referred hereinafter…

  9. Special Project for Research Training in Vocational Education: Research Training Series. Final Report.

    ERIC Educational Resources Information Center

    Vivian, Neal E.

    To upgrade research and research utilization competence of vocational educators, The Center for Vocational and Technical Education and The American Vocational Association planned four 1-week research training programs on: (1) Planning Vocational/Technical Education Programs Based on Manpower Research, (2) Patterns of Career Development as Applied…

  10. 78 FR 5310 - Relocation of and Spectrum Sharing by Federal Government Stations-Technical Panel and Dispute...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ...--The Wireless Association (CTIA); Comments of Ericsson, Inc. (Ericsson); Comments of Squire Sanders (US... promptly develop such plans, because OMB is not authorized to make any transfers from the Fund unless the... plans. See CTIA Comments at 7 (``Technical information such as transmitter power, receiver performance...

  11. A&M. Technical service laboratory in administration building (TAN602). Floor plan, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    A&M. Technical service laboratory in administration building (TAN-602). Floor plan, reception desk, door and finish schedules. Ralph M. Parsons 1480-12-ANP/GE-3-602-A-1. INEEL index code no. 033-0602-00-693-107488 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  12. New Concepts in Vocational-Technical Programs and Planning.

    ERIC Educational Resources Information Center

    Mochon, Clint

    The latest principle behind designing and planning vocational-technical school is "built-in-pride", which must be motivated in both student and surrounding community. We are at last emerging from the dark tunnel of the "trade school", away from the cold institutional look, the clamor of shop classrooms, echoing corridors, and the invisible tattoo…

  13. "A Technical Assistance Report" on Computer Technology Applications. Smithville School District, Smithville, Massachusetts.

    ERIC Educational Resources Information Center

    Merrimack Education Center, Chelmsford, MA.

    This report of the Technical Assistance Study provided to the Smithville Public Schools by the Technology Lighthouse of the Merrimack Education Center offers information for use in planning computer technology applications over a 3-year period. It provides specific guidelines and criteria for planning and development, equipment considerations,…

  14. 75 FR 34734 - Improving Market and Planning Efficiency Through Improved Software; Notice of Agenda and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... Market and Planning Efficiency Through Improved Software; Notice of Agenda and Procedures for Staff Technical Conference June 10, 2010. This notice establishes the agenda and procedures for the staff[email protected] . Kimberly D. Bose, Secretary. Agenda for AD10-12 Staff Technical Conference on Enhanced Power...

  15. Improvements in State and Local Planning for Mass Dispensing of Medical Countermeasures: The Technical Assistance Review Program, United States, 2007-2014.

    PubMed

    Renard, Paul G; Vagi, Sara J; Reinold, Chris M; Silverman, Brenda L; Avchen, Rachel N

    2017-09-01

    To evaluate and describe outcomes of state and local medical countermeasure preparedness planning, which is critical to ensure rapid distribution and dispensing of a broad spectrum of life-saving medical assets during a public health emergency. We used 2007 to 2014 state and local data collected from the Centers for Disease Control and Prevention's Technical Assistance Review. We calculated descriptive statistics from 50 states and 72 local Cities Readiness Initiative jurisdictions that participated in the Technical Assistance Review annually. From 2007 to 2014, the average overall Technical Assistance Review score increased by 13% for states and 41% for Cities Readiness Initiative jurisdictions. In 2014, nearly half of states achieved the maximum possible overall score (100), and 94% of local Cities Readiness Initiative jurisdictions achieved a score of 90 or more. Despite challenges, effective and timely medical countermeasure distribution and dispensing is possible with appropriate planning, staff, and resources. However, vigilance in training, exercising, and improving plans from lessons learned in a sustained, coordinated way is critical to ensure continued public health preparedness success.

  16. A qualitative study of governance of evolving response to non-communicable diseases in low-and middle- income countries: current status, risks and options.

    PubMed

    Rani, Manju; Nusrat, Sharmin; Hawken, Laura H

    2012-10-16

    Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions- institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms.Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as 'program management and implementation' entities rather than as lead 'technical advisory' bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. The 'technical functions' and 'implementation and management functions' should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH.The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs.

  17. A qualitative study of governance of evolving response to non-communicable diseases in low-and middle- income countries: current status, risks and options

    PubMed Central

    2012-01-01

    Background Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Methods Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions— institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Results Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms. Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as ‘program management and implementation’ entities rather than as lead ‘technical advisory’ bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. Conclusions The ‘technical functions’ and ‘implementation and management functions’ should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH. The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs. PMID:23067232

  18. Intersatellite link application to commercial communications satellites

    NASA Technical Reports Server (NTRS)

    Lee, Young S.; Atia, Ali E.; Ponchak, Denise S.

    1988-01-01

    The fundamental characteristics of intersatellite link (ISL) systems, and their application to domestic, regional, and global satellite communications, are described. The quantitative advantages of using ISLs to improve orbit utilization, spectrum occupancy, transmission delay (compared to multi-hop links), coverage, and connectivity, and to reduce the number of earth station antennas, are also presented. Cost-effectiveness and other systems benefits of using ISLs are identified, and the technical and systems planning aspects of ISL systems implementation are addressed.

  19. Manual of Documentation Practices Applicable to Defence-Aerospace Scientific and Technical Information. Volume 1. Section 1 - Acquisition and Sources. Section 2 - Descriptive Cataloguing. Section 3 - Abstracting and Subject Analysis

    DTIC Science & Technology

    1978-08-01

    weeding I I ORGANISATION & MANAGEMENT Aims and objectives, staffing, promotional activities, identifying u;ers 12 NETWORKS & EXTERNAL SOURCES OF...Acquisition Clerks with typing capability are required for meticulous recordkeeping. Typing capability of 50 words per minute and a working knowledge ...81 Adminhistration and Management Includes management planning and research. 64 Numerical Analysis Includes iteration, difference equations, and 82

  20. Goal Reconstruction: How Teton Blends Situated Action and Planned Action

    DTIC Science & Technology

    1989-11-03

    DTIC FILE COPy 00 P 1n GOAL RECONSTRUCTION: HOW TETON BLENDS N SITUATED ACTION AND PLANNED ACTION Technical Report AIP 125 Kurt VanLehn William Ball...distribiikn unlimited. so 08 21 2 GOAL RECONSTRUCTION: HOW TETON BLENDS SITUATED ACTION AND PLANNED ACTION Technical Report AlP 125 Kurt VanLehn William Ball...Architectures for Intelligence. This is the final report on the research supported by the Computer Science Division, Office of Naval Research, under

  1. Shifting Resources and Focus to Meet the Goals of the National HIV/AIDS Strategy: The Enhanced Comprehensive HIV Prevention Planning Project, 2010–2013

    PubMed Central

    Purcell, David W.; Fisher, Holly H.; Belcher, Lisa; Carey, James W.; Courtenay-Quirk, Cari; Dunbar, Erica; Eke, Agatha N.; Galindo, Carla A.; Glassman, Marlene; Margolis, Andrew D.; Neumann, Mary Spink; Prather, Cynthia; Stratford, Dale; Taylor, Raekiela D.; Mermin, Jonathan

    2016-01-01

    In September 2010, CDC launched the Enhanced Comprehensive HIV Prevention Planning (ECHPP) project to shift HIV-related activities to meet goals of the 2010 National HIV/AIDS Strategy (NHAS). Twelve health departments in cities with high AIDS burden participated. These 12 grantees submitted plans detailing jurisdiction-level goals, strategies, and objectives for HIV prevention and care activities. We reviewed plans to identify themes in the planning process and initial implementation. Planning themes included data integration, broad engagement of partners, and resource allocation modeling. Implementation themes included organizational change, building partnerships, enhancing data use, developing protocols and policies, and providing training and technical assistance for new and expanded activities. Pilot programs also allowed grantees to assess the feasibility of large-scale implementation. These findings indicate that health departments in areas hardest hit by HIV are shifting their HIV prevention and care programs to increase local impact. Examples from ECHPP will be of interest to other health departments as they work toward meeting the NHAS goals. PMID:26843670

  2. Planetary Protection Technologies: Technical Challenges for Mars Exploration

    NASA Technical Reports Server (NTRS)

    Buxbaum, Karen L.

    2005-01-01

    The search for life in the solar system, using either in situ analysis or sample return, brings with it special technical challenges in the area of planetary protection. Planetary protection (PP) requires planetary explorers to preserve biological and organic conditions for future exploration and to protect the Earth from potential extraterrestrial contamination that could occur as a result of sample return to the Earth-Moon system. In view of the exploration plans before us, the NASA Solar System Exploration Program Roadmap published in May 2003 identified planetary protection as one of 13 technologies for "high priority technology investments." Recent discoveries at Mars and Jupiter, coupled with new policies, have made this planning for planetary protection technology particularly challenging and relevant.New missions to Mars have been formulated, which present significantly greater forward contamination potential. New policies, including the introduction by COSPAR of a Category IVc for planetary protection, have been adopted by COSPAR in response. Some missions may not be feasible without the introduction of new planetary protection technologies. Other missions may be technically possible but planetary protection requirements may be so costly to implement with current technology that they are not affordable. A strategic investment strategy will be needed to focus on technology investments designed to enable future missions and reduce the costs of future missions. This presentation will describe some of the potential technological pathways that may be most protective.

  3. 44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Provision of technical... PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance... technical assistance to the licensee. Such assistance may be provided during the pendency of an appeal under...

  4. Transparent stakeholder engagement in practice: Lessons learned from applying comprehensive environmental assessment to research planning for nanomaterials.

    PubMed

    Powers, Christina; Hendren, Christine; Wang, Amy; Davis, J Michael

    2014-10-01

    As efforts to develop new applications of engineered nanoscale materials (ENMs) continue to grow, so too has interest in the environmental, health, and safety (EHS) implications of these materials. However, thorough evaluation and interpretation of such implications could require substantial resources (e.g., estimated as >$120 million per year in federal funding 2013-2017). A structured, strategic approach for transparently planning research would support improved linkages between ENM research and risk assessments, and thereby enhance the utility of financial and other resources for EHS studies of ENMs. For this reason, we applied Comprehensive Environmental Assessment (CEA) as an approach to provide transparent input into research planning for 2 types of ENMs: nanoscale titanium dioxide and nanoscale silver. For each of these CEA applications, we employed a collective judgment method known as Nominal Group Technique (NGT) in 2 workshops sponsored by the US Environmental Protection Agency (USEPA). The objective of this paper is to present the outcomes of these CEA applications in the context of how our methodology can inform future efforts to identify collective goals in science (e.g., research priorities) through structured decision support approaches. Outcomes include clear lists of research priorities for each ENM developed through transparently engaging stakeholders having diverse technical and sector perspectives. In addition, we identified several procedural aspects that could be refined, including emphasizing breakout group interactions, identifying broad information priorities before more detailed research questions, and using rating rather than ranking prioritization methods. Beyond the research directions identified for specific ENMs, lessons learned about engaging stakeholders in research planning are expected to inform future research planning efforts for ENMs and other emerging materials across the scientific community. © 2014 SETAC.

  5. Technical aspects of positron emission tomography/computed tomography in radiotherapy treatment planning.

    PubMed

    Scripes, Paola G; Yaparpalvi, Ravindra

    2012-09-01

    The usage of functional data in radiation therapy (RT) treatment planning (RTP) process is currently the focus of significant technical, scientific, and clinical development. Positron emission tomography (PET) using ((18)F) fluorodeoxyglucose is being increasingly used in RT planning in recent years. Fluorodeoxyglucose is the most commonly used radiotracer for diagnosis, staging, recurrent disease detection, and monitoring of tumor response to therapy (Lung Cancer 2012;76:344-349; Lung Cancer 2009;64:301-307; J Nucl Med 2008;49:532-540; J Nucl Med 2007;48:58S-67S). All the efforts to improve both PET and computed tomography (CT) image quality and, consequently, lesion detectability have a common objective to increase the accuracy in functional imaging and thus of coregistration into RT planning systems. In radiotherapy, improvement in target localization permits reduction of tumor margins, consequently reducing volume of normal tissue irradiated. Furthermore, smaller treated target volumes create the possibility of dose escalation, leading to increased chances of tumor cure and control. This article focuses on the technical aspects of PET/CT image acquisition, fusion, usage, and impact on the physics of RTP. The authors review the basic elements of RTP, modern radiation delivery, and the technical parameters of coregistration of PET/CT into RT computerized planning systems. Copyright © 2012 Elsevier Inc. All rights reserved.

  6. A Retrospective on Educational Planning in Comparative Education.

    ERIC Educational Resources Information Center

    Farrell, Joseph P.

    1997-01-01

    Defines and broadly traces the history of educational planning in both developing and industrialized capitalist nations. Discusses general approaches to educational planning (technical versus political planning, top-down versus bottom-up planning, and various theoretical bases); the contingency view of planning; case examples of planned,…

  7. Multicentre analysis of treatment planning information: technical requirements, possible applications and a proposal.

    PubMed

    Ebert, M A; Blight, J; Price, S; Haworth, A; Hamilton, C; Cornes, D; Joseph, D J

    2004-09-01

    Digital data from 3-D treatment planning computers is generally used for patient planning and then never considered again. However, such data contains enormous quantities of information regarding patient geometries, tissue outlining, treatment approaches and dose distributions. Were such data accessible from planning systems from multiple manufacturers, there would be substantial opportunities for undertaking quality assurance of radiotherapy clinical trials, prospective assessment of trial outcomes and basic treatment planning research and development. The technicalities of data exchange between planning systems are outlined, and previous attempts at producing systems capable of viewing and/or manipulating imaging and radiotherapy digital data reviewed. Development of a software system for enhancing the quality of Australasian clinical trials is proposed.

  8. Planning satellite communication services and spectrum-orbit utilization

    NASA Technical Reports Server (NTRS)

    Sawitz, P. H.

    1982-01-01

    The relationship between approaches to planning satellite communication services and spectrum-orbit utilization is considered, with emphasis on the fixed-satellite and the broadcasting-satellite services. It is noted that there are several possible approaches to planning space services, differing principally in the rigidity with which technical parameters are prescribed, in the time for which a plan remains in force, and in the procedures adopted for implementation and modifications. With some planning approaches, spectrum-orbit utilization is fixed at the time the plan is made. Others provide for greater flexibility by making it possible to postpone some decisions on technical parameters. In addition, the two political questions of what is equitable access and how it can be guaranteed in practice play an important role.

  9. For Work-Force Training, a Plan to Give College Credit Where It's Due

    ERIC Educational Resources Information Center

    Sander, Libby

    2008-01-01

    After nearly three years of planning, Ohio's higher-education officials are finalizing an ambitious program to grant college credit for some technical courses offered at the state's adult-education centers. The program, called the Career-Technical Credit Transfer, is the latest in a string of state efforts to more closely link work-force training…

  10. Strategic Business Plan for Economic Development Contract Services, July 1995-June 1997.

    ERIC Educational Resources Information Center

    Fox Valley Technical Coll., Appleton, WI.

    This plan describes the contract training and technical assistance services provided by Wisconsin's Fox Valley Technical College (FVTC) to area employers, focusing on the status of the services and ways to improve delivery for the July 1995 to June 1997 period. Following an executive summary, the second section focuses on contract services…

  11. TWRS Configuration management program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  12. 76 FR 18649 - Technical Revisions to Actuarial Information on Form 5500 Annual Return/Report for Pension Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 29 CFR Part 2520 Technical Revisions... Alternatives Under Pension Relief Act of 2010 AGENCY: Employee Benefits Security Administration, Labor. ACTION... 5500 Annual Return/Report of Employee Benefit Plan have been adopted in IRS Notice 2010-83 (2010-51 I.R...

  13. An Assessment of Future Educational and Occupational Plans for Brevard Community College Technical Program Students.

    ERIC Educational Resources Information Center

    Whitehead, Everett

    This practicum studies the future educational and/or occupational plans of 223 technical program students enrolled in Brevard Community College (BCC) during the Fall 1973 term in order to suggest adjustments in college procedures to facilitate student transition to continued college or to their chosen professions. The characteristics of technical…

  14. A Plan of Organization, Administration, and Elements of Finance for Vocational-Technical Adult Education, Birmingham City School System.

    ERIC Educational Resources Information Center

    Shelton, John Alton

    Designed to help formulate a plan of organization and administration for vocational and technical education and adult education in the Birmingham, Alabama, city schools, this study entailed an extensive literature review on vocational education and administrative matters; a historical review of several Birmingham schools (Paul Hayne School,…

  15. A National Periodicals Center Technical Development Plan.

    ERIC Educational Resources Information Center

    Council on Library Resources, Inc., Washington, DC.

    This technical plan for developing, managing, and operating a national periodicals center (NPC), which was prepared at the request of the Library of Congress, is designed so that it could be used by the Library or any other agency prepared to assume responsibility for the creation of a major periodicals facility. The overall goal of the NPC is to…

  16. Technical Report on Manpower Planning. Technical Group Report No. 7.

    ERIC Educational Resources Information Center

    Montana Commission on Post-Secondary Education, Helena.

    The report is one of a series containing data and recommendations relevant to the task of developing future plans for Montana's post-secondary education. A brief introduction outlines the methods used in gathering information on manpower needs, and is followed by a review and summarization of the data collected, including a description, analysis,…

  17. 76 FR 43963 - Regional Haze State Implementation Plan; State of Nevada; Extension of Comment Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... deadline for written comments on the proposed approval of the Regional Haze SIP by 30 days to August 22... technical materials that form the basis of Nevada's Regional Haze SIP and EPA's proposed approval. The EPA...'s proposed approval of the technical analyses presented in Nevada's plan. DATES: The comment period...

  18. Jobsite Supervisor Instructor's Manual for Electrical Apprentice Technical Training. Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    One hundred and sixteen lesson plans for a first, second, third and fourth year electrical apprentice technical training program are presented in this manual. The lesson plans are generally organized into four steps: introducing the lesson, presenting the lessons (e.g., demonstration), student application (use of worksheets), and checking and…

  19. Gender Planning and Vocational Education, and Technical Training in Palestine: An Initial Framework. Gender and Society Working Paper #4.

    ERIC Educational Resources Information Center

    Nahleh, Lamis Abu

    Gender planning and vocational education and technical training (VETT) in Palestine were examined through the following: review of available literature and policy-oriented reports, discussions with educators in the field, and roundtable discussion in which representatives of the Palestinian Ministry of Education and Ministry of Labor and experts…

  20. 40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...

  1. 40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...

  2. 40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...

  3. Emergency management in health: key issues and challenges in the UK.

    PubMed

    Lee, Andrew C K; Phillips, Wendy; Challen, Kirsty; Goodacre, Steve

    2012-10-19

    Emergency planning in the UK has grown considerably in recent years, galvanised by the threat of terrorism. However, deficiencies in NHS emergency planning were identified and the evidence-base that underpins it is questionable. Inconsistencies in terminologies and concepts also exist. Different models of emergency management exist internationally but the optimal system is unknown. This study examines the evidence-base and evidence requirements for emergency planning in the UK health context. The study involved semi-structured interviews with key stakeholders and opinion leaders. Purposive sampling was used to obtain a breadth of views from various agencies involved in emergency planning and response. Interviews were then analysed using a grounded approach using standard framework analysis techniques. We conducted 17 key informant interviews. Interviewees identified greater gaps in operational than technical aspects of emergency planning. Social and behavioural knowledge gaps were highlighted with regards to how individuals and organisations deal with risk and behave in emergencies. Evidence-based approaches to public engagement and for developing community resilience to disasters are lacking. Other gaps included how knowledge was developed and used. Conflicting views with regards to the optimal configuration and operation of the emergency management system were voiced. Four thematic categories for future research emerged:(i) Knowledge-base for emergency management: Further exploration is needed of how knowledge is acquired, valued, disseminated, adopted and retained.(ii) Social and behavioural issues: Greater understanding of how individuals approach risk and behave in emergencies is required.(iii) Organisational issues in emergencies: Several conflicting organisational issues were identified; value of planning versus plans, flexible versus standardized procedures, top-down versus bottom-up engagement, generic versus specific planning, and reactive versus proactive approaches to emergencies.(iv) Emergency management system: More study is required of system-wide issues relating to system configuration and operation, public engagement, and how emergency planning is assessed.

  4. [In search of results of technical cooperation].

    PubMed

    Jourdan Hidalgo, L; Manuel Sotelo, J

    1999-06-01

    For the Pan American Health Organization (PAHO), technical cooperation (TC) is the process by which the PAHO Member States work with the Organization, as equal partners, to identify and reach their own health goals and to promote self-sufficiency in health development, through programs that respond to those countries' needs and national priorities. Since 1978, PAHO has used the American Regional Planning, Programming, Monitoring, and Evaluation System (AMPES) to establish management procedures and to facilitate decision-making in health TC. As part of AMPES, PAHO uses a "logical approach to project management" to structure the work program of the Organization and to identify the expected results from TC activities and TC resource investments. This project management approach, which replaces the "functional approaches" system used to date, also helps establish a causative relationship between the programmed activities and the results that PAHO expects, and between the activities and the hoped-for outcomes in the countries. As part of an ongoing process of rethinking international health TC, several years ago PAHO began a four-phase study on the usefulness and validity of functional approaches and on the need to propose new ones or to modify existing ones. The results of the initial phase showed it was difficult to classify the activities because the functional-approaches categories were not mutually exclusive and the TC activities were complex. Further, the expected results did not specify the product for which the PAHO Secretariat was accountable within a certain time frame nor the Secretariat's level of responsibility. Thus, a new and more flexible classification of expected results was proposed, with the following categories: cooperation networks and alliances; surveillance and information systems; standards and guidelines; research and evaluation studies; plans, projects, and policies; methods, models, and technologies; training programs; promotional campaigns and advocacy; and direct support. In the second phase of the study, it was concluded that the proposed classification system made it possible to more precisely identify the products of PAHO technical cooperation projects, the Organization's degree of responsibility, and the bases for estimating needed resources. The new system could also facilitate monitoring and evaluation. In addition, the third phase of analyzing the functional approaches has begun. Its objective is to evaluate the effect of technical cooperation based on the changes incorporated in the programming of activities.

  5. Users perspectives on interactive distance technology enabling home-based motor training for stroke patients.

    PubMed

    Ehn, Maria; Hansson, Pär; Sjölinder, Marie; Boman, Inga-Lill; Folke, Mia; Sommerfeld, Disa; Borg, Jörgen; Palmcrantz, Susanne

    2015-01-01

    The aim of this work has been to develop a technical support enabling home-based motor training after stroke. The basis for the work plan has been to develop an interactive technical solution supporting three different groups of stroke patients: (1) patients with stroke discharged from hospital with support from neuro team; (2) patients with stroke whose support from neuro team will be phased out and (3) patients living with impaired motor functions long-term. The technology has been developed in close collaboration with end-users using a method earlier evaluated and described [12]. This paper describes the main functions of the developed technology. Further, results from early user-tests with end-users, performed to identify needs for improvements to be carried out during further technical development. The developed technology will be tested further in a pilot study of the safety and, usefulness of the technology when applied as a support for motor training in three different phases of the post-stroke rehabilitation process.

  6. Methods and Models of the Hanford Internal Dosimetry Program, PNNL-MA-860

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, Eugene H.; Bihl, Donald E.; Maclellan, Jay A.

    2009-09-30

    The Hanford Internal Dosimetry Program (HIDP) provides internal dosimetry support services for operations at the Hanford Site. The HIDP is staffed and managed by the Radiation and Health Technology group, within the Pacific Northwest National Laboratory (PNNL). Operations supported by the HIDP include research and development, the decontamination and decommissioning of facilities formerly used to produce and purify plutonium, and waste management activities. Radioelements of particular interest are plutonium, uranium, americium, tritium, and the fission and activation product radionuclides 137Cs, 90Sr, and 60Co. This manual describes the technical basis for the design of the routine bioassay monitoring program and formore » assessment of internal dose. The purposes of the manual are as follows: • Provide assurance that the HIDP derives from a sound technical base. • Promote the consistency and continuity of routine program activities. • Provide a historical record. • Serve as a technical reference for radiation protection personnel. • Aid in identifying and planning for future needs.« less

  7. Internal Controls for the Military Sealift Command Portion of the Transportation Business Area of the FY 1994 Defense Business Operations Fund Financial Statements

    DTIC Science & Technology

    1995-06-28

    Secondary Reports Dilution Unit, Audit Planning and Technical Support Directorate, at (703) 604-8937 (DSN 664-8937) or FAX (703) 604-8932. Suggestions...for Future Audits To suggest ideas for or to request future audits , contact the Planning and Coordination Branch, Audit Planning and Technical...Defense OAIG-AUD (ATTN: APTS Audit Suggestions) 400 Army Navy Drive (Room 801) Arlington, Virginia 22202-2884 DoD Hotline To report fraud, waste

  8. Structural dynamics division research and technology accomplishments for F.Y. 1991 and plans for F.Y. 1992

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1992-01-01

    The work under each technical area is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest. The structural dynamics division consist of the following branches: configuration aeroelasticity; unsteady aerodynamics; aeroservoelasticity; landing and impact dynamics; and spacecraft dynamics.

  9. Integrated Technology Plan for the Civil Space Program, 1991

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of the Integrated Technology Plan (ITP) is to serve as a strategic plan for the OAST space research and technology (R&T) program, and as a strategic planning framework for other NASA and national participants in advocating and conducting technology developments that support future U.S. civil space missions. The ITP begins with a discussion of the national policy and NASA organization which establishes the overall framework for civil space R&T planning. The second chapter provides a top-level review of the potential users of civil space R&T, their strategic mission plans, and the technologies they have identified as needed to achieve those plans. The overall methodology used to develop a civil space technology strategy is discussed. The technical details of the 1991 strategic plan are described, ending with a review of civil space R&T priorities. The fourth chapter describes how the strategic plan is annually translated into the OAST Space R&T Program, with a summary of the fiscal year 1992 program. The ITP concludes with a discussion of requirements for technology development coordination and strategies for facilitating the transfer of civil space technology to the private sector. Several appendices also are attached that provide further information regarding budget implications of the strategic plan, organizational roles, and other topics.

  10. Virtual Whipple: preoperative surgical planning with volume-rendered MDCT images to identify arterial variants relevant to the Whipple procedure.

    PubMed

    Brennan, Darren D; Zamboni, Giulia; Sosna, Jacob; Callery, Mark P; Vollmer, Charles M V; Raptopoulos, Vassilios D; Kruskal, Jonathan B

    2007-05-01

    The purposes of this study were to combine a thorough understanding of the technical aspects of the Whipple procedure with advanced rendering techniques by introducing a virtual Whipple procedure and to evaluate the utility of this new rendering technique in prediction of the arterial variants that cross the anticipated surgical resection plane. The virtual Whipple is a novel technique that follows the complex surgical steps in a Whipple procedure. Three-dimensional reconstructed angiographic images are used to identify arterial variants for the surgeon as part of the preoperative radiologic assessment of pancreatic and ampullary tumors.

  11. 7 CFR 4284.630 - Other considerations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 1940 of this title. Applications for technical assistance or planning projects are generally excluded... within their plans the important environmental factors within the planning area and the potential environmental impacts of the plan on the planning area, as well as the alternative planning strategies that were...

  12. WE-A-BRD-01: MR Imaging for Treatment Planning: What Every Physicist Should Know

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGee, K.

    2015-06-15

    Ever since its introduction as a diagnostic imaging modality over 30 years ago, the radiation therapy community has acknowledged the utility of MR imaging as a tool for not only improved visualization of the target volume but also for demarcation of adjacent organs at risk. However, the adaptation of MR imaging in radiation oncology has, until recently been slow due in large part to the inability to image radiation therapy patients in their treatment position. With the introduction of so-called wide bore high field MR scanners, multi element flexible receive only RF coils, high performance imaging gradients and a rangemore » of volumetric imaging sequences it is now possible to obtain both high resolution and high signal-to-noise ratio images of in-treatment radiation therapy patients within clinically feasible imaging times. As a Result, there is renewed interest in the use of MR imaging for radiation oncology treatment planning that is being translated into physical siting and integration of these systems into radiation oncology departments. As MR imaging expands into the radiation oncology domain there is a significant and unmet need for radiation therapy physicists to become educated regarding the strengths, limitations and technical challenges associated with MR imaging. The purpose of this presentation is to address this need by providing an educational overview of the techniques and challenges associated with MR imaging of patients for radiation therapy treatment planning. As such this presentation will: 1) describe the fundamental differences between imaging of patients for diagnostic and therapeutic purposes (i.e. radiation therapy planning), 2) describe most commonly used imaging sequences and contrasts for identification of disease for radiation planning, 3) identify the most common sources of image distortion and techniques to reduce their effect on spatial fidelity of the MR data, 4) describe the effects of motion and methods to quantify/correct it, and 5) identify emergent techniques for performing MR only treatment simulation. Upon completion attendees will have a working understanding of the basic methodologies associated with MR imaging in radiation oncology, the unique technical challenges imposed by MR imaging in the treatment position and techniques to address these. Learning Objectives: 1. Understand the differences between MR imaging for diagnostic imaging and for radiation therapy planning. 2. Identify the most common sources of distortion and artifacts and simple methods to correct them. 3. Understand the challenges with MR imaging in the therapy treatment position and appropriate techniques to address them.« less

  13. Spectrum orbit utilization program technical manual SOUP5 Version 3.8

    NASA Technical Reports Server (NTRS)

    Davidson, J.; Ottey, H. R.; Sawitz, P.; Zusman, F. S.

    1984-01-01

    The underlying engineering and mathematical models as well as the computational methods used by the SOUP5 analysis programs, which are part of the R2BCSAT-83 Broadcast Satellite Computational System, are described. Included are the algorithms used to calculate the technical parameters and references to the relevant technical literature. The system provides the following capabilities: requirements file maintenance, data base maintenance, elliptical satellite beam fitting to service areas, plan synthesis from specified requirements, plan analysis, and report generation/query. Each of these functions are briefly described.

  14. Technical-Information Products for a National Volcano Early Warning System

    USGS Publications Warehouse

    Guffanti, Marianne; Brantley, Steven R.; Cervelli, Peter F.; Nye, Christopher J.; Serafino, George N.; Siebert, Lee; Venezky, Dina Y.; Wald, Lisa

    2007-01-01

    Introduction Technical outreach - distinct from general-interest and K-12 educational outreach - for volcanic hazards is aimed at providing usable scientific information about potential or ongoing volcanic activity to public officials, businesses, and individuals in support of their response, preparedness, and mitigation efforts. Within the context of a National Volcano Early Warning System (NVEWS) (Ewert et al., 2005), technical outreach is a critical process, transferring the benefits of enhanced monitoring and hazards research to key constituents who have to initiate actions or make policy decisions to lessen the hazardous impact of volcanic activity. This report discusses recommendations of the Technical-Information Products Working Group convened in 2006 as part of the NVEWS planning process. The basic charge to the Working Group was to identify a web-based, volcanological 'product line' for NVEWS to meet the specific hazard-information needs of technical users. Members of the Working Group were: *Marianne Guffanti (Chair), USGS, Reston VA *Steve Brantley, USGS, Hawaiian Volcano Observatory HI *Peter Cervelli, USGS, Alaska Volcano Observatory, Anchorage AK *Chris Nye, Division of Geological and Geophysical Surveys and Alaska Volcano Observatory, Fairbanks AK *George Serafino, National Oceanic and Atmospheric Administration, Camp Springs MD *Lee Siebert, Smithsonian Institution, Washington DC *Dina Venezky, USGS, Volcano Hazards Team, Menlo Park CA *Lisa Wald, USGS, Earthquake Hazards Program, Golden CO

  15. 30 CFR 777.13 - Reporting of technical data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... descriptions of the methodology used to collect and analyze the data. (b) Technical analyses shall be planned... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reporting of technical data. 777.13 Section 777... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...

  16. 76 FR 43175 - Approval of Air Quality Implementation Plans; Indiana and Ohio; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... impact. EPA stated that the state's conclusion should be supported by an adequate technical analysis. EPA... by an adequate technical analysis. IDEM did not provide a technical analysis in its submittal, but... technical analysis and justification necessary to make that demonstration. Indiana did not provide any...

  17. IMPLICATIONS OF WOMEN'S WORK PATTERNS FOR PROGRAM DEVELOPMENT IN VOCATIONAL AND TECHNICAL EDUCATION.

    ERIC Educational Resources Information Center

    LEE, SYLVIA L.; AND OTHERS

    THE IMPLICATIONS OF WOMEN'S LABOR FORCE PARTICIPATION FOR EDUCATORS AND LEADERS PLANNING PROGRAMS IN VOCATIONAL AND TECHNICAL EDUCATION WERE DERIVED AT A 2-DAY CONFERENCE BY 30 PEOPLE REPRESENTING THE VARIOUS SERVICES IN VOCATIONAL-TECHNICAL EDUCATION AND RELATED AREAS. IMPLICATIONS AND RECOMMENDATIONS FOR VOCATIONAL AND TECHNICAL EDUCATION…

  18. Light Water Reactor Sustainability Program Advanced Instrumentation, Information, and Control Systems Technologies Technical Program Plan for FY 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hallbert, Bruce Perry; Thomas, Kenneth David

    2015-10-01

    Reliable instrumentation, information, and control (II&C) systems technologies are essential to ensuring safe and efficient operation of the U.S. light water reactor (LWR) fleet. These technologies affect every aspect of nuclear power plant (NPP) and balance-of-plant operations. In 1997, the National Research Council conducted a study concerning the challenges involved in modernization of digital instrumentation and control systems in NPPs. Their findings identified the need for new II&C technology integration.

  19. A Structured Reasoning Space for Design of Complex, Socio-Technical Systems

    DTIC Science & Technology

    2006-10-01

    gather during midmorning at an identified location. The human intelligence sources indicate that the meeting will commence at 10 a.m. and finish ...refueling station. 21 Typ-s of .uppr-s1on capawility Soppe.oion lob. (.-a .h~po d" Coton ) Olotano.. O otk-lo n k brWg..t.. Tbo AabNity rl.o1 Loft...designer or analyst could use the reasoning space to consider whether current and alternative configurations can result in the plan being finished within

  20. Fifth Conference on Artificial Intelligence for Space Applications

    NASA Technical Reports Server (NTRS)

    Odell, Steve L. (Compiler)

    1990-01-01

    The Fifth Conference on Artificial Intelligence for Space Applications brings together diverse technical and scientific work in order to help those who employ AI methods in space applications to identify common goals and to address issues of general interest in the AI community. Topics include the following: automation for Space Station; intelligent control, testing, and fault diagnosis; robotics and vision; planning and scheduling; simulation, modeling, and tutoring; development tools and automatic programming; knowledge representation and acquisition; and knowledge base/data base integration.

  1. Process and assembly plans for low cost commercial fuselage structure

    NASA Technical Reports Server (NTRS)

    Willden, Kurtis; Metschan, Stephen; Starkey, Val

    1991-01-01

    Cost and weight reduction for a composite structure is a result of selecting design concepts that can be built using efficient low cost manufacturing and assembly processes. Since design and manufacturing are inherently cost dependent, concurrent engineering in the form of a Design-Build Team (DBT) is essential for low cost designs. Detailed cost analysis from DBT designs and hardware verification must be performed to identify the cost drivers and relationships between design and manufacturing processes. Results from the global evaluation are used to quantitatively rank design, identify cost centers for higher ranking design concepts, define and prioritize a list of technical/economic issues and barriers, and identify parameters that control concept response. These results are then used for final design optimization.

  2. A planning-oriented sustainability assessment framework for peri-urban water management in developing countries.

    PubMed

    Starkl, Markus; Brunner, Norbert; López, Eduardo; Martínez-Ruiz, José Luis

    2013-12-15

    DPSIR and the three-pillar model are well-established frameworks for sustainability assessment. This paper proposes a planning-oriented sustainability assessment framework (POSAF). It is informed by those frameworks but differs insofar as it puts more emphasis on a constructivist conception which recognises that sustainability needs to be defined anew for each planning problem. In finding such a consensus definition, POSAF uses participatory scenario analysis and participatory planning, technical feasibility study, participatory assessment, analysis of trade-offs and social networks in an unusual combination and for goals that differ from the original conceptions of these methods. POSAF was applied in a peri-urban area of Mexico City for the design of improved water service provision, integrating solid waste management. It supported consensus amongst users about the importance of environmental issues, informed planners about the values of stakeholders and users, detected local differences, and identified possible conflicts at an early stage of decision-making. Copyright © 2013 Elsevier Ltd. All rights reserved.

  3. Electronic Health Record System Contingency Plan Coordination: A Strategy for Continuity of Care Considering Users' Needs.

    PubMed

    Fernández, Marcela T; Gómez, Adrián R; Santojanni, Américo M; Cancio, Alfredo H; Luna, Daniel R; Benítez, Sonia E

    2015-01-01

    Electronic Health Record system downtimes may have a great impact on patient care continuity. This paper describes the analysis and actions taken to redesign the Contingency Plan Procedure for the Electronic Health Record System of Hospital Italiano de Buenos Aires. After conducting a thorough analysis of the data gathered at post-contingency meetings, weaknesses were identified in the procedure; thus, strategic actions were recommended to redesign the Contingency Plan to secure an effective communications channel, as well as a formal structure for functions that may support the decision-making process. The main actions were: 1) to incorporate the IT Contingencies Committee (Plan management); 2) to incorporate the Coordinator (general supervision of the procedure); and 3) to redefine the role of the Clinical Informatics Resident, who will be responsible for managing communication between the technical team and Electronic Health Record users. As users need the information for continuity of care, key users evaluated the impact of the new strategy with an adapted survey.

  4. Disaster recovery plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adams, D.E.

    The BMS production implementation will be complete by October 1, 1998 and the server environment will be comprised of two types of platforms. The PassPort Supply and the PeopleSoft Financials will reside on LNIX servers and the PeopleSoft Human Resources and Payroll will reside on Microsoft NT servers. Because of the wide scope and the requirements of the COTS products to run in various environments backup and recovery responsibilities are divided between two groups in Technical Operations. The Central Computer Systems Management group provides support for the LTNIX/NT Backup Data Center, and the Network Infrastructure Systems group provides support formore » the NT Application Server Backup outside the Data Center. The disaster recovery process is dependent on a good backup and recovery process. Information and integrated system data for determining the disaster recovery process is identified from the Fluor Daniel Hanford (FDH) Risk Assessment Plan, Contingency Plan, and Backup and Recovery Plan, and Backup Form for HANDI 2000 BMS.« less

  5. 7 CFR 652.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE SUPPORT ACTIVITIES TECHNICAL SERVICE PROVIDER ASSISTANCE General Provisions § 652.2 Definitions... public agencies certified by NRCS to provide technical services to a participant. Certification means the... technical service for conservation planning or a specific conservation practice or system; or (2) An entity...

  6. Instructor's Manual for Electrical Apprentice Technical Training. Series No. D (Fourth Year). Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    Twenty-seven lesson plans for a fourth-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized into four steps:…

  7. Colombo Plan Intra-Regional Technician Training Colloquium (6th, Kuala Lumpur, Malaysia, April 21-25, 1975).

    ERIC Educational Resources Information Center

    Colombo Plan Bureau (Sri Lanka).

    Proceedings of the Sixth Colloquium on Intra-Regional Technical Training sponsored jointly by the Colombo Plan and the Government of Malaysia are presented in this report. Four working papers are presented centered around three main areas of concern: influence of technical education on economic development; how the status of technicians could be…

  8. Instructor's Manual for Electrical Apprentice Technical Training. Series No. A (First Year). Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    Thirty-six lesson plans for the first of a four-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized into…

  9. Instructor's Manual for Electrical Apprentice Technical Training. Series No. B (Second Year). Revised to Meet 1978 Electrical Code.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    Twenty-eight lesson plans for the second year of a four-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized…

  10. Strategic Mobility 21 Project Management Plan

    DTIC Science & Technology

    2006-09-29

    California Association of Governments (SCAG), and other stakeholders to transform the former military installation into a modern in-land distribution node... governments , including adversary governments , and may be exported. c. This statement may not be used on technical documents that formerly were...required updates of both the ICD and the Technical Plan. SM21 has established a consortium of public and private, governmental and non

  11. Convergence Properties of a Class of Probabilistic Adaptive Schemes Called Sequential Reproductive Plans. Psychology and Education Series, Technical Report No. 210.

    ERIC Educational Resources Information Center

    Martin, Nancy

    Presented is a technical report concerning the use of a mathematical model describing certain aspects of the duplication and selection processes in natural genetic adaptation. This reproductive plan/model occurs in artificial genetics (the use of ideas from genetics to develop general problem solving techniques for computers). The reproductive…

  12. Enterprise Planning for Change; Co-ordination of Manpower and Technical Planning. Industrial Relations Aspects of Manpower Policy, No. 5.

    ERIC Educational Resources Information Center

    Wedderburn, Dorothy

    Forty case studies made by research teams of independents or governmental agencies in Austria, Canada, France, Germany, Norway, Sweden, United Kingdom, and the United States were analyzed to provide managements and trade unions with illustrations of present systems of technical and manpower changes at the enterprise level and to describe the…

  13. Improvements in State and Local Planning for Mass Dispensing of Medical Countermeasures: The Technical Assistance Review Program, United States, 2007–2014

    PubMed Central

    Vagi, Sara J.; Reinold, Chris M.; Silverman, Brenda L.; Avchen, Rachel N.

    2017-01-01

    Objectives. To evaluate and describe outcomes of state and local medical countermeasure preparedness planning, which is critical to ensure rapid distribution and dispensing of a broad spectrum of life-saving medical assets during a public health emergency. Methods. We used 2007 to 2014 state and local data collected from the Centers for Disease Control and Prevention’s Technical Assistance Review. We calculated descriptive statistics from 50 states and 72 local Cities Readiness Initiative jurisdictions that participated in the Technical Assistance Review annually. Results. From 2007 to 2014, the average overall Technical Assistance Review score increased by 13% for states and 41% for Cities Readiness Initiative jurisdictions. In 2014, nearly half of states achieved the maximum possible overall score (100), and 94% of local Cities Readiness Initiative jurisdictions achieved a score of 90 or more. Conclusions. Despite challenges, effective and timely medical countermeasure distribution and dispensing is possible with appropriate planning, staff, and resources. However, vigilance in training, exercising, and improving plans from lessons learned in a sustained, coordinated way is critical to ensure continued public health preparedness success. PMID:28892441

  14. PLAN-TA9-2443(U), Rev. B Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing Standard Procedure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Geoffrey Wayne

    2016-03-16

    This document identifies scope and some general procedural steps for performing Remediated Nitrate Salt (RNS) Surrogate Formulation and Testing. This Test Plan describes the requirements, responsibilities, and process for preparing and testing a range of chemical surrogates intended to mimic the energetic response of waste created during processing of legacy nitrate salts. The surrogates developed are expected to bound1 the thermal and mechanical sensitivity of such waste, allowing for the development of process parameters required to minimize the risk to worker and public when processing this waste. Such parameters will be based on the worst-case kinetic parameters as derived frommore » APTAC measurements as well as the development of controls to mitigate sensitivities that may exist due to friction, impact, and spark. This Test Plan will define the scope and technical approach for activities that implement Quality Assurance requirements relevant to formulation and testing.« less

  15. Prevalence of technical errors and periapical lesions in a sample of endodontically treated teeth: a CBCT analysis.

    PubMed

    Nascimento, Eduarda Helena Leandro; Gaêta-Araujo, Hugo; Andrade, Maria Fernanda Silva; Freitas, Deborah Queiroz

    2018-01-21

    The aims of this study are to identify the most frequent technical errors in endodontically treated teeth and to determine which root canals were most often associated with those errors, as well as to relate endodontic technical errors and the presence of coronal restorations with periapical status by means of cone-beam computed tomography images. Six hundred eighteen endodontically treated teeth (1146 root canals) were evaluated for the quality of their endodontic treatment and for the presence of coronal restorations and periapical lesions. Each root canal was classified according to dental groups, and the endodontic technical errors were recorded. Chi-square's test and descriptive analyses were performed. Six hundred eighty root canals (59.3%) had periapical lesions. Maxillary molars and anterior teeth showed higher prevalence of periapical lesions (p < 0.05). Endodontic treatment quality and coronal restoration were associated with periapical status (p < 0.05). Underfilling was the most frequent technical error in all root canals, except for the second mesiobuccal root canal of maxillary molars and the distobuccal root canal of mandibular molars, which were non-filled in 78.4 and 30% of the cases, respectively. There is a high prevalence of apical radiolucencies, which increased in the presence of poor coronal restorations, endodontic technical errors, and when both conditions were concomitant. Underfilling was the most frequent technical error, followed by non-homogeneous and non-filled canals. Evaluation of endodontic treatment quality that considers every single root canal aims on warning dental practitioners of the prevalence of technical errors that could be avoided with careful treatment planning and execution.

  16. Identification, assessment, and control of hazards in water supply: experiences from Water Safety Plan implementations in Germany.

    PubMed

    Mälzer, H-J; Staben, N; Hein, A; Merkel, W

    2010-01-01

    According to the recommendations of the World Health Organization (WHO) for Water Safety Plans (WSP), a Technical Risk Management was developed, which considers standard demands in drinking water treatment in Germany. It was already implemented at several drinking water treatment plants of different size and treatment processes in Germany. Hazards affecting water quality, continuity, and the reliability of supply from catchment to treatment and distribution could be identified by a systematic approach, and suitable control measures were defined. Experiences are presented by detailed examples covering methods, practical consequences, and further outcomes. The method and the benefits for the water suppliers are discussed and an outlook on the future role of WSPs in German water supply is given.

  17. Active microwave users working group program planning

    NASA Technical Reports Server (NTRS)

    Ulaby, F. T.; Bare, J.; Brown, W. E., Jr.; Childs, L. F.; Dellwig, L. F.; Heighway, J. E.; Joosten, R.; Lewis, A. J.; Linlor, W.; Lundien, J. R.

    1978-01-01

    A detailed programmatic and technical development plan for active microwave technology was examined in each of four user activities: (1) vegetation; (2) water resources and geologic applications, and (4) oceanographic applications. Major application areas were identified, and the impact of each application area in terms of social and economic gains were evaluated. The present state of knowledge of the applicability of active microwave remote sensing to each application area was summarized and its role relative to other remote sensing devices was examined. The analysis and data acquisition techniques needed to resolve the effects of interference factors were reviewed to establish an operational capability in each application area. Flow charts of accomplished and required activities in each application area that lead to operational capability were structured.

  18. ATF Neutron Irradiation Program Technical Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geringer, J. W.; Katoh, Yutai

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization ofmore » irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.« less

  19. Dengue Contingency Planning: From Research to Policy and Practice

    PubMed Central

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini

    2016-01-01

    Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan. PMID:27653786

  20. Technical quality of root canal treatment performed by undergraduate students using hand instrumentation: a meta-analysis.

    PubMed

    Ribeiro, D M; Réus, J C; Felippe, W T; Pacheco-Pereira, C; Dutra, K L; Santos, J N; Porporatti, A L; De Luca Canto, G

    2018-03-01

    The technical quality of root canal treatment (RCT) may impact on the outcome. The quality of education received during undergraduate school may be linked to the quality of treatment provided in general dental practice. In this context, the aim of this systematic review was to answer the following focused questions: (i) What is the frequency of acceptable technical quality of root fillings, assessed radiographically, performed by undergraduate students? (ii) What are the most common errors assessed radiographically and reported in these treatments? For this purpose, articles that evaluated the quality of root fillings performed by undergraduate students were selected. Data were collected based on predetermined criteria. The key features from the included studies were extracted. GRADE-tool assessed the quality of the evidence. MAStARI evaluated the methodological quality, and a meta-analysis on all studies was conducted. At the end of the screening, 24 articles were identified. Overall frequency of acceptable technical quality of root fillings was 48%. From this total, 52% related to anterior teeth, 49% to premolars and 26% to molars. The main procedural errors reported were ledge formation, furcation perforation, apical transportation and apical perforation. The heterogeneity amongst the studies was high (84-99%). Five studies had a high risk of bias, eight had a moderate risk, and 11 had low risk. The overall quality of evidence identified was very low. The conclusion was that technical quality of root fillings performed by undergraduate students is low, which may reveal that endodontic education has limited achievement at undergraduate level. A plan to improve the quality of root fillings, and by extrapolation the overall quality of root canal treatment, should be discussed by the staff responsible for endodontic education and training. © 2017 International Endodontic Journal. Published by John Wiley & Sons Ltd.

  1. Planning emergency medical communications

    DOT National Transportation Integrated Search

    1996-06-01

    This technical bulletin summarizes a two volume publication entitled "Planning Emergency Medical Communications." Volume One, the State Level Planning Guide, contains general background information about a two tiered approach to EMS communications pl...

  2. 15 CFR 295.6 - Criteria for selection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... proposal will be funded unless the Program determines that it has scientific and technological merit and... does not have an adequate technical and commercialization plan. (a) Scientific and technological merit... innovation, the technical approach, major technical hurdles, the attendant risks, and clearly establish...

  3. Rural planning organizations--their role in transportation planning and project development in Texas : technical report.

    DOT National Transportation Integrated Search

    2010-10-01

    While a formal planning and programming process is established for urbanized areas through Metropolitan : Planning Organizations, no similar requirement has been established for rural areas. Currently, under the : Safe, Accountable, Flexible, Efficie...

  4. The Myth of Employee Planning for Retirement

    ERIC Educational Resources Information Center

    Morrison, Malcolm H.

    1975-01-01

    A survey of male hourly-wage earners indicates employees face serious problems in planning for income security in retirement. Retirement preparation programs that supply information and technical planning expertise are needed to assist employees in realistic retirement planning. (EA)

  5. Health care quality: from data to accountability.

    PubMed

    Darby, M

    1998-08-01

    The many audiences for information about the quality of health care have different and sometimes conflicting interests and priorities. This is reflected in the diversity of current efforts to use health care data to identify, measure, and demonstrate quality. The author surveys three of these approaches in depth: (1) the professional approach, which relies on the actions of private-sector accreditation groups, trade associations and health plans, hospitals, and other providers to assure quality; (2) the market-driven approach, which relies on the use of quality data by health care purchasers and consumers in choosing plans and providers; and (3) the public-sector approach, which relies on the regulatory, oversight, and purchasing actions of government at the federal, state, and local levels to assure quality. The author concludes that efforts to measure and report the quality of health care invariably confront a variety of technical and political issues. Several observers maintain that it is more important for participants in quality issues to reach consensus on the issues than to reach technical perfection in the way the data are handled. Important obstacles in the technical realm include inadequate investment in sufficiently sophisticated and compatible information systems and the fact that where such systems are in place, they generally cannot be linked. But efforts, both technical and legal, are under way to overcome these obstacles. Even so, some of the issues of health care quality will remain moving targets because of constant changes in the health care environment and in technology. The author closes with the hope that the various actors within the health care industry may coordinate their efforts in dealing with these issues.

  6. 7 CFR 1780.54 - Technical services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., Constructing and Inspections § 1780.54 Technical services. Owners are responsible for providing the engineering, architect and environmental services necessary for planning, designing, bidding, contracting, inspecting...

  7. The Technical Assistance Program: A Program Plan.

    DTIC Science & Technology

    1985-09-01

    interests, talents, and hobbies of current employees who wish to become involved in the technical assistance program . 4. Capitalize on the corporate...Center San Diego, CA 92152 Telephone (619) 225-6281 B-33 TAP ( EMPLOYEE ) QUESTIONNAIRE - The Technical Assistance Program (TAP) links technically skilled...Brochure, "Retired Technologist" C-11 C. Sample Letter to NOSC Employees C-13 Brochure D. The Technical Assistance Program C-15 C-1

  8. Development of a technical assistance framework for building organizational capacity of health programs in resource-limited settings.

    PubMed

    Reyes, E Michael; Sharma, Anjali; Thomas, Kate K; Kuehn, Chuck; Morales, José Rafael

    2014-09-17

    Little information exists on the technical assistance needs of local indigenous organizations charged with managing HIV care and treatment programs funded by the US President's Emergency Plan for AIDS Relief (PEPFAR). This paper describes the methods used to adapt the Primary Care Assessment Tool (PCAT) framework, which has successfully strengthened HIV primary care services in the US, into one that could strengthen the capacity of local partners to deliver priority health programs in resource-constrained settings by identifying their specific technical assistance needs. Qualitative methods and inductive reasoning approaches were used to conceptualize and adapt the new Clinical Assessment for Systems Strengthening (ClASS) framework. Stakeholder interviews, comparisons of existing assessment tools, and a pilot test helped determine the overall ClASS framework for use in low-resource settings. The framework was further refined one year post-ClASS implementation. Stakeholder interviews, assessment of existing tools, a pilot process and the one-year post- implementation assessment informed the adaptation of the ClASS framework for assessing and strengthening technical and managerial capacities of health programs at three levels: international partner, local indigenous partner, and local partner treatment facility. The PCAT focus on organizational strengths and systems strengthening was retained and implemented in the ClASS framework and approach. A modular format was chosen to allow the use of administrative, fiscal and clinical modules in any combination and to insert new modules as needed by programs. The pilot led to refined pre-visit planning, informed review team composition, increased visit duration, and restructured modules. A web-based toolkit was developed to capture three years of experiential learning; this kit can also be used for independent implementation of the ClASS framework. A systematic adaptation process has produced a qualitative framework that can inform implementation strategies in support of country led HIV care and treatment programs. The framework, as a well-received iterative process focused on technical assistance, may have broader utility in other global programs.

  9. EPA Technical Support Centers (TSC): FY14 Lessons ...

    EPA Pesticide Factsheets

    EPA’s Technical Support Centers (TSC) included in ORD’s Safe and Healthy Communities (SHC) Research Action Plan fill the need for supplying subject-matter experts to continually assess state-of-the-art research and practices and channel this information to users in both direct applications (i.e., site-specific technical support) and general applications (i.e., technical transfer activities such as technical guidance documents, conferences, or workshops) . The TSCs are charged with providing solutions by: 1) linking EPA research to Agency decision-makers; 2) applying best practices to real world field applications; and 3) channeling feedback from field application to research communities. The TSP goal is to provide Regional Remedial Project Managers (RPMs), Corrective Action Staff, and On-Scene Coordinators (OSCs) with a diverse set of readily-accessible resources for technical assistance. This research summary provides six case studies – two from each of the three TSCs (Ground Water Technical Support Center, Engineering Technical Support Center, and Site Characterization Technical Support Center) – to exemplify and summarize the variety of TSC approaches that contribute to fulfilling the TSP mission. EPA’s Technical Support Centers (TSC) included in ORD’s Safe and Healthy Communities (SHC) Research Action Plan fill the need for supplying subject-matter experts to continually assess state-of-the-art research and practices and channel this informati

  10. Professional, Technical and Kindred Workers: Where They Come From, Where They Go In The Commonwealth of Pennsylvania. Information For Student Career Planning.

    ERIC Educational Resources Information Center

    Driscoll, Jeanne Baker; Herr, Edwin L.

    Intended for use in occupational and education planning by students and counselors, this document contains information about the 106 occupations which are included in the professional, technical, and kindred workers cluster of the U.S. census. The occupations are grouped by field of interest. For each occupation, the information provided includes…

  11. TLOG: Training and Educating Operational Logistic Planners

    DTIC Science & Technology

    2008-05-22

    monograph recommends specific changes to the current curriculum. Additions in operational knowledge provide the students technical knowledge and a...common frame of reference in campaign planning. The changes result in students not only technically competent to design a concept of support, but...planning process. The implementation of these changes enhance TLog’s curriculum to meet the course’s stated goal; the graduates will be the

  12. A Study of the Educational and Manpower Needs of the Catawba Valley Technical Institute Impact Area.

    ERIC Educational Resources Information Center

    Sumerell, Craven H.

    The purpose of this study was to make a survey of the educational needs of the community served by the Catawba Valley Technical Institute (CVTI), the results of which would serve as a basis for the projection, planning, and revision of the CVTI instructional programs and the planning of physical facilities. In this cooperative venture, the data…

  13. Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase 1 Technical Report

    DTIC Science & Technology

    1990-04-05

    MANAGEMENT INFORMATION , COMMUNICATIONS, AND COMPUTER SCIENCES Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase I Technical...perceived provides information in multiple modalities and, in fact, we may rely on a non-verbal mode for much of our understanding of the situation...some tasks, almost all the pertinent information is provided via diagrams, maps, znd other illustrations. Visual Knowledge Visual experience forms a

  14. 15 CFR 295.6 - Criteria for selection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... innovation, the technical approach, major technical hurdles, the attendant risks, and clearly establish... project and project's organizational structure and management plan, including the extent to which...

  15. 40 CFR 52.1110 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... technical and environmental compliance assistance program. 52.1110 Section 52.1110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Maryland § 52.1110 Small business stationary source technical and environmental...

  16. Testing of Mortar Systems

    DTIC Science & Technology

    2010-03-11

    IEP /TDP) or Independent Assessment Plan (IAP), and the test item and the procedures as outlined in this TOP. The following must also be considered...Command DTIC = Defense Technical Information Center DTP = Detailed Test Plan IAP = Independent Assessment Plan IEP = Independent Evaluation Plan IPT

  17. An Airborne Communications Roadmap for the U.S. Federal Air Marshal Service: Overview and Status

    NASA Technical Reports Server (NTRS)

    Martzaklis, Konstantinos S.

    2007-01-01

    Following the events of September 11, 2001, the responsibilities, operations and numbers of the U.S. Federal Air Marshal Service (FAMS) wer e greatly expanded. With this expansion, new critical research and te chnology needs were identified, including the need for air to ground telecommunications capabilities. To address this need, the FAMS has cr eated a working group to develop, deploy and enhance aviation communi cations with respect to security and law enforcement. This paper presents the working group's progress to date in generating a FAMS air-gro und communications roadmap identifying expected communications servic es, technology maturity, and technology gaps over a timeline. The paper includes a communications preliminary requirements summary and syst em performance characteristics needed to meet identified operational needs. The system engineering process utilized is presented beginning with the identification of users, their operational needs and relevant constraints. The operational needs are translated to desired airbor ne communications services. System technical performance requirements associated with the identified services are summarized. In addition, notional communications architectures addressing the requirements are presented. Finally, future plans to identify and assess potential ca ndidate systems and their associated technical architectures, gaps and barriers to implementation are discussed. The paper addresses the cu rrent, near term (within 5 years) and far term (10 years) timeframes for such an airborne communications system.

  18. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  19. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  20. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) A cyber security plan in accordance with the criteria set forth in § 73.54 of this chapter; (iv) A... cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan, shall protect the plans and...

  1. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  2. Small Business Innovation Research. Program solicitation. Closing date: July 21, 1992

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The National Aeronautics and Space Administration (NASA) invites small businesses to submit Phase 1 proposals in response to its Small Business Innovation Research (SBIR) Program Solicitation 92-1. Firms with research or research and development capabilities (R/R&D) in science or engineering in any of the areas listed are encouraged to participate. This, the tenth annual SBIR solicitation by NASA, describes the program, identifies eligibility requirements, describes the proposal evaluation and award selection process, and provides other information to assist those interested in participating in NASA's SBIR program. It also identifies, in Section 8.0, the technical topics and subtopics in which SBIR Phase 1 proposals are solicited in 1992. These topics and subtopics cover a broad range of current NASA interests but do not necessarily include all areas in which NASA plans or currently conducts research. The NASA SBIR program seeks innovative approaches that respond to the needs, technical requirements, and new opportunities described in the subtopics. The focus is on innovation through the use of emerging technologies, novel applications of existing technologies, exploitation of scientific breakthroughs, or new capabilities or major improvements to existing technologies. NASA plans to select about 320 high-quality research or research and development proposals for Phase 1 contract awards on the basis of this Solicitation. Phase 1 contracts are normally six months in duration and funded up to $50,000, including profit. Selections will be based on the competitive merits of the offers and on NASA needs and priorities.

  3. SOFIA Program SE and I Lessons Learned

    NASA Technical Reports Server (NTRS)

    Ray, Ronald J.; Fobel, Laura J.; Brignola, Michael P.

    2011-01-01

    Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.

  4. Cerulean Warbler Technical Group: Coordinating international research and conservation

    USGS Publications Warehouse

    Dawson, D.K.; Wigley, T.B.; Keyser, P.D.

    2012-01-01

    Effective conservation for species of concern requires interchange and collaboration among conservationists and stakeholders. The Cerulean Warbler Technical Group (CWTG) is a consortium of biologists and managers from government agencies, non-governmental organizations, academia, and industry, who are dedicated to finding pro-active, science-based solutions for conservation of the Cerulean Warbler (Setophaga cerulea). Formed in the United States in 2001, CWTG’s scope soon broadened to address the species’ ecology and conservation on both the breeding and non-breeding ranges, in partnership with biologists from South and Central America. In 2004, CWTG launched the Cerulean Warbler Conservation Initiative, a set of activities aimed at addressing information and conservation needs for the species. These include (1) studies in the core breeding range to assess Cerulean Warbler response to forest management practices and to identify mined lands that could be reforested to benefit the species, (2) ecological and demographic studies on the winter range, and (3) surveys of Cerulean Warbler distribution on the breeding and winter ranges and during migration. A rangewide conservation action plan has been completed, along with a more detailed conservation plan for the non-breeding range. CWTG and partners now move forward with on-the-ground conservation, while still addressing unmet information needs.

  5. Review of Residential Low-Load HVAC Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Scott A.; Thornton, Brian A.; Widder, Sarah H.

    In support of the U.S. Department of Energy’s (DOE’s) Building America Program, Pacific Northwest National Laboratory (PNNL) conducted an investigation to inventory commercially available HVAC technologies that are being installed in low-load homes. The first step in this investigation was to conduct a review of published literature to identify low-load HVAC technologies available in the United States and abroad, and document the findings of existing case studies that have evaluated the performance of the identified technologies. This report presents the findings of the literature review, identifies gaps in the literature or technical understanding that must be addressed before low-load HVACmore » technologies can be fully evaluated, and introduces PNNL’s planned research and analysis for this project to address identified gaps and potential future work on residential low-load HVAC systems.« less

  6. Camp Minden Draft QASP and Work Plan for Public Feedback

    EPA Pesticide Factsheets

    ESI has developed these operational plans, technical approaches, and related required resources based upon extensive review and planning for material removal, transportation, staging, and Contained Burn Chamber (CBC) destruction of materials.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Kyle B.; Tagestad, Jerry D.; Perkins, Casey J.

    This study was conducted with the support of the U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office (WWPTO) as part of ongoing efforts to minimize key risks and reduce the cost and time associated with permitting and deploying ocean renewable energy. The focus of the study was to discuss a possible approach to exploring scenarios for ocean renewable energy development in Hawaii that attempts to optimize future development based on technical, economic, and policy criteria. The goal of the study was not to identify potentially suitable or feasible locations for development, but to discuss how such anmore » approach may be developed for a given offshore area. Hawaii was selected for this case study due to the complex nature of the energy climate there and DOE’s ongoing involvement to support marine spatial planning for the West Coast. Primary objectives of the study included 1) discussing the political and economic context for ocean renewable energy development in Hawaii, especially with respect to how inter-island transmission may affect the future of renewable energy development in Hawaii; 2) applying a Geographic Information System (GIS) approach that has been used to assess the technical suitability of offshore renewable energy technologies in Washington, Oregon, and California, to Hawaii’s offshore environment; and 3) formulate a mathematical model for exploring scenarios for ocean renewable energy development in Hawaii that seeks to optimize technical and economic suitability within the context of Hawaii’s existing energy policy and planning.« less

  8. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    PubMed

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  9. Management of technical date in Nihon Doro kodan

    NASA Astrophysics Data System (ADS)

    Hanada, Jun'ichi

    Nihon Doro Kodan Laboratory has collected and contributed technical data (microfiches, aerial photographs, books and literature) on plans, designs, constructions and maintenance of the national expressways and the ordinary toll roads since 1968. This work is systematized on computer to retrieve and contribute data faster. Now Laboratory operates Technical Data Management System which manages all of technical data and Technical Document Management System which manages technical documents. These systems stand on users' on-line retrieval and data accumuration by microfiches and optical disks.

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sheaffer, P.; Lemar, P.; Honton, E. J.

    The Universal Interconnection Technology (UIT) Workshop - sponsored by the U.S. Department of Energy, Distributed Energy and Electric Reliability (DEER) Program, and Distribution and Interconnection R&D - was held July 25-26, 2002, in Chicago, Ill., to: (1) Examine the need for a modular universal interconnection technology; (2) Identify UIT functional and technical requirements; (3) Assess the feasibility of and potential roadblocks to UIT; (4) Create an action plan for UIT development. These proceedings begin with an overview of the workshop. The body of the proceedings provides a series of industry representative-prepared papers on UIT functions and features, present interconnection technology,more » approaches to modularization and expandability, and technical issues in UIT development as well as detailed summaries of group discussions. Presentations, a list of participants, a copy of the agenda, and contact information are provided in the appendices of this document.« less

  11. Key Points to Facilitate the Adoption of Computer-Based Assessments.

    PubMed

    Burr, S A; Chatterjee, A; Gibson, S; Coombes, L; Wilkinson, S

    2016-01-01

    There are strong pedagogical arguments in favor of adopting computer-based assessment. The risks of technical failure can be managed and are offset by improvements in cost-effectiveness and quality assurance capability. Academic, administrative, and technical leads at an appropriately senior level within an institution need to be identified, so that they can act as effective advocates. All stakeholder groups need to be represented in undertaking a detailed appraisal of requirements and shortlisting software based on core functionality, summative assessment life cycle needs, external compatibility, security, and usability. Any software that is a candidate for adoption should be trialed under simulated summative conditions, with all stakeholders having a voice in agreeing the optimum solution. Transfer to a new system should be carefully planned and communicated, with a programme of training established to maximize the success of adoption.

  12. Key Points to Facilitate the Adoption of Computer-Based Assessments

    PubMed Central

    Burr, S.A.; Chatterjee, A.; Gibson, S.; Coombes, L.; Wilkinson, S.

    2016-01-01

    There are strong pedagogical arguments in favor of adopting computer-based assessment. The risks of technical failure can be managed and are offset by improvements in cost-effectiveness and quality assurance capability. Academic, administrative, and technical leads at an appropriately senior level within an institution need to be identified, so that they can act as effective advocates. All stakeholder groups need to be represented in undertaking a detailed appraisal of requirements and shortlisting software based on core functionality, summative assessment life cycle needs, external compatibility, security, and usability. Any software that is a candidate for adoption should be trialed under simulated summative conditions, with all stakeholders having a voice in agreeing the optimum solution. Transfer to a new system should be carefully planned and communicated, with a programme of training established to maximize the success of adoption. PMID:29349322

  13. A community health worker intervention to address the social determinants of health through policy change.

    PubMed

    Ingram, Maia; Schachter, Ken A; Sabo, Samantha J; Reinschmidt, Kerstin M; Gomez, Sofia; De Zapien, Jill Guernsey; Carvajal, Scott C

    2014-04-01

    Public policy that seeks to achieve sustainable improvements in the social determinants of health, such as income, education, housing, food security and neighborhood conditions, can create positive and sustainable health effects. This paper describes preliminary results of Acción para la Salud, a public health intervention in which Community health workers (CHWs) from five health agencies engaged their community in the process of making positive systems and environmental changes. Academic-community partners trained Acción CHWs in community advocacy and provided ongoing technical assistance in developing strategic advocacy plans. The CHWs documented community advocacy activities through encounter forms in which they identified problems, formulated solutions, and described systems and policy change efforts. Strategy maps described the steps of the advocacy plans. Findings demonstrate that CHWs worked to initiate discussions about underlying social determinants and environment-related factors that impact health, and identified solutions to improve neighborhood conditions, create community opportunities, and increase access to services.

  14. 48 CFR 1631.205-76 - Trade, business, technical, and professional activity costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Trade, business, technical....205-76 Trade, business, technical, and professional activity costs. (a) FEHBP participating plans, carriers, and underwriters shall seek the advance written approval of the contracting officer for...

  15. Technical Assistance for Arts Facilities: A Sourcebook. A Report.

    ERIC Educational Resources Information Center

    Educational Facilities Labs., Inc., New York, NY.

    This booklet is a directory of sources of technical assistance on problems relating to physical facilities for arts organizations. Wherever possible, agencies and organizations are described in their own words. Technical assistance in the area of physical facilities encompasses planning, financing, acquiring, renovating, designing, and maintaining…

  16. A key to success: optimizing the planning process

    NASA Astrophysics Data System (ADS)

    Turk, Huseyin; Karakaya, Kamil

    2014-05-01

    By adopting The NATO Strategic Concept Document in 2010, some important changes in the perception of threat and management of crisis were introduced. This new concept, named ''Comprehensive Approach'', includes the precautions of pre-crisis management, applications of crisis-duration management and reconstruction phase of post-intervention management. NATO will be interested in not only the political and military options , but also social, economical and informational aspects of crisis. NATO will take place in all phases of conflict. The conflicts which occur outside the borders of NATO's nations and terrorism are perceived as threat sources for peace and stability. In addition to conventional threats, cyber attacks which threaten network-supported communication systems, preventing applications from accessing to space that will be used in different fields of life. On the other hand, electronic warfare capabilities which can effect us negatively are added to threat list as new threats. In the process in which military is thought as option, a harder planning phase is waiting for NATO's decision makers who struggle for keeping peace and security. Operation planning process which depends on comprehensive approach, contains these steps: Situational awareness of battlefield, evaluation of the military intervention options, orientation, developing an operation plan, reviewing the plan and transition phases.1 To be successful in theater which is always changing with the technological advances, there has to be an accurate and timely planning on the table. So, spending time for planning can be shown as one of the biggest problem. In addition, sustaining situational awareness which is important for the whole operation planning process, technical command and control hitches, human factor, inability to determine the center of gravity of opponent in asymmetrical threat situations can be described as some of the difficulties in operation planning. In this study, a possible air operation planning process is analyzed according to a comprehensive approach. The difficulties of planning are identified. Consequently, for optimizing a decisionmaking process of an air operation, a planning process is identified in a virtual command and control structure.

  17. Vector control activities: Fiscal Year, 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-04-01

    The program is divided into two major components - operations and support studies. The support studies are designed to improve the operational effectiveness and efficiency of the control program and to identify other vector control problems requiring TVA attention and study. Nonchemical methods of control are emphasized and are supplemented with chemical measures as needed. TVA also cooperates with various concerned municipalities in identifying blood-sucking arthropod pest problems and demonstrating control techniques useful in establishing abatement programs, and provides technical assistance to other TVA programs and organizations. The program also helps Land Between The Lakes (LBL) plan and conduct vectormore » control operations and tick control research. Specific program control activities and support studies are discussed.« less

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moir, E.B.

    The kinds and quality of blockages to creativity are studied for two groups of employees, a group of peer-identified creative individuals and a group attending a career/life planning workshop. The employees from both groups represent a cross section of scientists/engineers, administrators, and technical support personnel and administrative support personnel. The design and results of the study are discussed, and some recommendations are made. It was found that the blockages of creative employees, as a group, were different from those of the self-selected, workshop group. Blockages reported by the peer-identified group were lack of time, office disharmony, and personal limitations, whilemore » those reported by the self-selected group were lack of time and fear of risk. (RWR)« less

  19. Virtual surgical planning and 3D printing in repeat calvarial vault reconstruction for craniosynostosis: technical note.

    PubMed

    LoPresti, Melissa; Daniels, Bradley; Buchanan, Edward P; Monson, Laura; Lam, Sandi

    2017-04-01

    Repeat surgery for restenosis after initial nonsyndromic craniosynostosis intervention is sometimes needed. Calvarial vault reconstruction through a healed surgical bed adds a level of intraoperative complexity and may benefit from preoperative and intraoperative definitions of biometric and aesthetic norms. Computer-assisted design and manufacturing using 3D imaging allows the precise formulation of operative plans in anticipation of surgical intervention. 3D printing turns virtual plans into anatomical replicas, templates, or customized implants by using a variety of materials. The authors present a technical note illustrating the use of this technology: a repeat calvarial vault reconstruction that was planned and executed using computer-assisted design and 3D printed intraoperative guides.

  20. Multihazard risk analysis and disaster planning for emergency services as a basis for efficient provision in the case of natural hazards - case study municipality of Au, Austria

    NASA Astrophysics Data System (ADS)

    Maltzkait, Anika; Pfurtscheller, Clemens

    2014-05-01

    Multihazard risk analysis and disaster planning for emergency services as a basis for efficient provision in the case of natural hazards - case study municipality of Au, Austria A. Maltzkait (1) & C. Pfurtscheller (1) (1) Institute for Interdisciplinary Mountain Research (IGF), Austrian Academy of Sciences, Innsbruck, Austria The extreme flood events of 2002, 2005 and 2013 in Austria underlined the importance of local emergency services being able to withstand and reduce the adverse impacts of natural hazards. Although for legal reasons municipal emergency and crisis management plans exist in Austria, they mostly do not cover risk analyses of natural hazards - a sound, comparable assessment to identify and evaluate risks. Moreover, total losses and operational emergencies triggered by natural hazards have increased in recent decades. Given sparse public funds, objective budget decisions are needed to ensure the efficient provision of operating resources, like personnel, vehicles and equipment in the case of natural hazards. We present a case study of the municipality of Au, Austria, which was hardly affected during the 2005 floods. Our approach is primarily based on a qualitative risk analysis, combining existing hazard plans, GIS data, field mapping and data on operational efforts of the fire departments. The risk analysis includes a map of phenomena discussed in a workshop with local experts and a list of risks as well as a risk matrix prepared at that workshop. On the basis for the exact requirements for technical and non-technical mitigation measures for each natural hazard risk were analysed in close collaboration with members of the municipal operation control and members of the local emergency services (fire brigade, Red Cross). The measures includes warning, evacuation and, technical interventions with heavy equipment and personnel. These results are used, first, to improve the municipal emergency and crisis management plan by providing a risk map, and a list of risks and, second, to check if the local emergency forces can cope with the different risk scenarios using locally available resources. The emergency response plans will identify possible resource deficiencies in personnel, vehicles and equipment. As qualitative methods and data are used, uncertainties in the study emerged in finding definitions for safety targets, in the construction of the different risk scenarios, in the inherent uncertainty beyond the probability of occurrence and the intensity of natural hazards, also in the case of the expectable losses. Finally, we used available studies and expert interviews to develop objective rules for investment decisions for the fire departments and the Red Cross to present an empirically sound basis for the efficient provision of intervention in the case of natural hazards for the municipality of Au. Again, the regulations for objective provision were developed in close collaboration with the emergency services.

  1. Guidelines for the planning and preparation of illustrated technical talks

    NASA Technical Reports Server (NTRS)

    Hubbard, H. H.

    1975-01-01

    Guidelines are presented for the preparation of illustrated talks which are audience oriented and which are aimed at the efficient transfer of technical information. Early decisions concerning the required number of slides are helpful in initial planning for a good quality talk. Detailed considerations are: the establishment of limited objectives, selection of appropriate slide material, development of a text which is well coordinated with the slides, and accurate timing.

  2. Information Resource Management Planning in the Office of the Under Secretary of Defense (Acquisition)

    DTIC Science & Technology

    1989-08-01

    Include in this plan the role of the Defense Technical Information Center (DTIC), the Defense Technology Security Administration ( DTSA ), and ODDR&E’s...DTIC = Defense Technical Information Center DTSA = Defense Technology Security Administration DUSD = Deputy Under Secretary of Defense Gloss. 2 DUSD...technologically sensitive requests. The Defense Technology Security Administi ation ( DTSA ) is developing a large system to track foreign military sales

  3. 10 CFR 603.885 - Updated program plans and budgets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision requiring the recipient to annually prepare an updated technical plan for future conduct of the research...

  4. Connected vehicle impacts on transportation planning : technical memorandum #5 : case studies.

    DOT National Transportation Integrated Search

    2015-12-01

    The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...

  5. Technical efficiency of Shiraz school of medicine in research and education domains: a data envelopment analysis.

    PubMed

    Delavari, Somayeh; Rezaee, Rita; Hatam, Nahid; Delavari, Sajad

    2016-01-01

    Efficiency evaluation of universities and faculties is one of the tools that help managers to identify the departments' strengths and weakness. The main objective of the present research was to measure and compare the technical efficiency of Shiraz school of medicine departments using Data Envelopment Analysis (DEA) technique. This cross-sectional and retrospective study was performed on clinical and non-clinical departments in research and education domains over the period of 2006 to 2011. Different inputs and outputs were considered for research and educational domain separately. Efficiency was measured based on the observed optimal performance. Findings showed that pathology and anatomy departments achieved the score of 100 in technical efficiency in education during 2006 to 2011. During this period, parasitology, psychiatric and pediatrics department's achieved the score of 100 for technical efficiency in research domain. The lowest mean of relative educational efficiency belonged to orthopedic department; as to relative research efficiency, the lowest mean was shown in orthopedics and genetics departments. The mean technical efficiency of non-medical departments in education and research domain was 91.93 and 76.08, respectively, while the mean technical efficiency of the clinical department in educational and research fields was 91.02 and 82.23, respectively. Using multiple input and output in DEA technique provided a comprehensive evaluation of efficiency in Shiraz school of medicine departments. The DEA could successfully estimate the technical efficiency of the departments in research and educational fields. Moreover, the deficiency in each department was found; this could help them to plan for improvement.

  6. Guidelines for Establishing and Evaluating High School Technical Electromechanics Programs.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Div. of Vocational, Technical and Adult Education.

    Educators and industrial representatives developed these guidelines for school officials, instructors in technical education, and program and facility planners to use in planning a high school program in technical electromechanics. Designed to train students for entry into industry in applied electromechanics, the program includes electricity,…

  7. Impact of Automation on Technical Services.

    ERIC Educational Resources Information Center

    Rooks, Dana C.; Thompson, Linda L.

    1988-01-01

    Discusses the impact of automation on library technical services, and the need for library managers to be aware of the issues involved and to plan for future developments. The discussion focuses on the areas of job related concerns of technical staff, organizational structures, recruitment and training, and ergonomic considerations. (CLB)

  8. 76 FR 43136 - Approval and Promulgation of Air Quality Implementation Plan; Kentucky; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... supported by an adequate technical analysis. Second, EPA recommended the various types of information that... technical analysis, including, but not limited to, information concerning emissions in the state...: ``* * * without an adequate technical analysis EPA does not believe that states can sufficiently address the...

  9. 76 FR 2853 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... technical analysis submitted for parallel-processing by DNREC on December 9, 2010, to address significant... technical analysis submitted by DNREC for parallel-processing on December 9, 2010, to satisfy the... consists of a technical analysis that provides detailed support for Delaware's position that it has...

  10. 34 CFR 366.15 - What selection criteria does the Secretary use?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Training and Technical Assistance § 366.15 What selection criteria does the Secretary use? The Secretary uses the following criteria to evaluate applications for new awards for training and technical... project; and (2) How the objectives further training and technical assistance with respect to planning...

  11. Vocational-Technical Education: A Plan for Monroe County, Florida.

    ERIC Educational Resources Information Center

    Mills, Hugh L., Sr., Ed.; Pilcher, Palmer, C., Ed.

    Suggested vocational-technical education programs for the Monroe County Florida school system are presented along with recommendations to implement the principle of coordinated career education in the public schools. Expansion of vocational-technical programs is emphasized to expose all students from kindergarten through Grade 12 to career…

  12. Colonialism and Secondary Technical Education in Hong Kong: 1945-1997

    ERIC Educational Resources Information Center

    Lau, Wai Wah; Kan, Flora

    2011-01-01

    This study examines the influence of the colonial experience (1945-1997) on the planning of secondary technical education in Hong Kong. Specifically, the origins of secondary technical institutions and their positioning in secondary education are examined. Primary source materials are used as the basis of investigation and analysis, supplemented…

  13. 40 CFR 52.744 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business stationary source technical and environmental compliance assistance program. 52.744 Section 52.744 Protection of Environment... PLANS Illinois> § 52.744 Small business stationary source technical and environmental compliance...

  14. 40 CFR 52.798 - Small business stationary source technical and environmental compliance assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business stationary source technical and environmental compliance assistance program. 52.798 Section 52.798 Protection of Environment... PLANS Indiana § 52.798 Small business stationary source technical and environmental compliance...

  15. Science-based strategic planning for hazardous fuel treatment.

    Treesearch

    D.L. Peterson; M.C. Johnson

    2007-01-01

    A scientific foundation coupled with technical support is needed to develop long-term strategic plans for fuel and vegetation treatments on public lands. These plans are developed at several spatial scales and are typically a component of fire management plans and other types of resource management plans. Such plans need to be compatible with national, regional, and...

  16. 40 CFR 52.1119 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revision for a Small Business Technical and Environmental Compliance Assistance Program dated... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan-conditional... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Massachusetts § 52.1119...

  17. 40 CFR 52.1519 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revision for a Small Business Technical and Environmental compliance Assistance Program dated... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan-conditional... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1519...

  18. Conceptualizing 2000: Proactive Planning.

    ERIC Educational Resources Information Center

    Angel, Dan, Ed.; DeVault, Mike, Ed.

    As community, technical, and junior colleges approach the 21st century, faculty shortages, an increasingly diverse student body, dwindling financial resources, and accountability mandates will require careful, action-oriented college planning. This two-part book presents 10 articles on the dynamics of planning and specific planning models, and…

  19. Connected vehicle impacts on transportation planning technical memorandum #2 : connected vehicle planning processes and products and stakeholder roles and responsibilities.

    DOT National Transportation Integrated Search

    2015-01-01

    The objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed by States...

  20. Connected vehicle impacts on transportation planning technical memorandum #6: skills and expertise required to incorporate connected vehicles into transportation planning.

    DOT National Transportation Integrated Search

    2016-02-08

    Professional development and training are essential to the incorporation of connected/automated vehicles (C/AV) into the transportation planning process. In order to guarantee a successful deployment, transportation planning agencies and their stakeh...

  1. Brownfields Green Avenue Sites: Technical Memorandum - Conceptual Design for Sustainable Redevelopment

    EPA Pesticide Factsheets

    This technical memorandum briefly describes the site and proposed conceptual site plan, indicates conceptual design considerations, specifies recommended green and sustainable features, and offers other recommendations

  2. A business man views commercial ventures in space.

    NASA Technical Reports Server (NTRS)

    Scarff, D. D.; Bloom, H. L.

    1973-01-01

    Paper reviews technical, resource planning and marketing steps an industrial organization must perform in arriving at a decision to undertake space development and production of commercial products or services for Users on the ground. Technical elements are supported by particular examples. Analysis of required resources emphasizes facility and financial inter-relationships between commercial organizations and NASA. Marketing planning covers elements of profitability. Paper addresses questions related to protection of corporate stockholders and public interest, investment decision timing, budget variations. Paper concludes with observations on timeliness of planning shuttle-based commercial ventures and on key industry/NASA problems and decisions.

  3. Three-dimensional path planning software-assisted transjugular intrahepatic portosystemic shunt: a technical modification.

    PubMed

    Tsauo, Jiaywei; Luo, Xuefeng; Ye, Linchao; Li, Xiao

    2015-06-01

    This study was designed to report our results with a modified technique of three-dimensional (3D) path planning software assisted transjugular intrahepatic portosystemic shunt (TIPS). 3D path planning software was recently developed to facilitate TIPS creation by using two carbon dioxide portograms acquired at least 20° apart to generate a 3D path for overlay needle guidance. However, one shortcoming is that puncturing along the overlay would be technically impossible if the angle of the liver access set and the angle of the 3D path are not the same. To solve this problem, a prototype 3D path planning software was fitted with a utility to calculate the angle of the 3D path. Using this, we modified the angle of the liver access set accordingly during the procedure in ten patients. Failure for technical reasons occurred in three patients (unsuccessful wedged hepatic venography in two cases, software technical failure in one case). The procedure was successful in the remaining seven patients, and only one needle pass was required to obtain portal vein access in each case. The course of puncture was comparable to the 3D path in all patients. No procedure-related complication occurred following the procedures. Adjusting the angle of the liver access set to match the angle of the 3D path determined by the software appears to be a favorable modification to the technique of 3D path planning software assisted TIPS.

  4. Technical Feasibility Aspects of the Geothermal Resource Reporting Methodology (GRRM)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Badgett, Alex; Young, Katherine R; Dobson, Patrick F.

    This paper reviews the technical assessment of the Geothermal Research Reporting Methodology (GRRM, http://en.openei.org/wiki/GRRM) being developed for reporting geothermal resources and project progress. The goal of the methodology is to provide the U.S. Department of Energy's Geothermal Technologies Office (GTO) with a consistent and comprehensible means of evaluating the impacts of its funding programs. The GRRM is designed to provide uniform assessment criteria for geothermal resource grades and developmental phases of geothermal resource exploration and development. This resource grade system provides information on twelve attributes of geothermal resource locations (e.g., temperature, permeability, land access) to indicate potential for geothermal development.more » The GTO plans to use these Protocols to help quantitatively identify the greatest barriers to geothermal development, develop measureable program goals that will have the greatest impact to geothermal deployment, objectively evaluate proposals based (in part) on a project's ability to contribute to program goals, monitor project progress, and report on GTO portfolio performance. The GRRM assesses three areas of geothermal potential: geological, socio-economic, and technical. Previous work and publications have discussed the work done on the geological aspects of this methodology (Young et al. 2015c); this paper details the development of the technical assessment of the GRRM. Technical development attributes considered include: reservoir management, drilling, logistics, and power conversion.« less

  5. 76 FR 47613 - Board Meeting: September 13-14, 2011-Salt Lake City, UT; the U.S. Nuclear Waste Technical Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... NUCLEAR WASTE TECHNICAL REVIEW BOARD Board Meeting: September 13-14, 2011--Salt Lake City, UT; the U.S. Nuclear Waste Technical Review Board Will Meet To Discuss DOE Plans for Used Fuel Disposition R... Amendments Act of 1987, the U.S. Nuclear Waste Technical Review Board will hold a public meeting in Salt Lake...

  6. Spatially explicit data: stewardship and ethical challenges in science.

    PubMed

    Hartter, Joel; Ryan, Sadie J; Mackenzie, Catrina A; Parker, John N; Strasser, Carly A

    2013-09-01

    Scholarly communication is at an unprecedented turning point created in part by the increasing saliency of data stewardship and data sharing. Formal data management plans represent a new emphasis in research, enabling access to data at higher volumes and more quickly, and the potential for replication and augmentation of existing research. Data sharing has recently transformed the practice, scope, content, and applicability of research in several disciplines, in particular in relation to spatially specific data. This lends exciting potentiality, but the most effective ways in which to implement such changes, particularly for disciplines involving human subjects and other sensitive information, demand consideration. Data management plans, stewardship, and sharing, impart distinctive technical, sociological, and ethical challenges that remain to be adequately identified and remedied. Here, we consider these and propose potential solutions for their amelioration.

  7. Designing systematic conservation assessments that promote effective implementation: best practice from South Africa.

    PubMed

    Knight, Andrew T; Driver, Amanda; Cowling, Richard M; Maze, Kristal; Desmet, Philip G; Lombard, Amanda T; Rouget, Mathieu; Botha, Mark A; Boshoff, Andre F; Castley, J Guy; Goodman, Peter S; Mackinnon, Kathy; Pierce, Shirley M; Sims-Castley, Rebecca; Stewart, Warrick I; von Hase, Amrei

    2006-06-01

    Systematic conservation assessment and conservation planning are two distinct fields of conservation science often confused as one and the same. Systematic conservation assessment is the technical, often computer-based, identification of priority areas for conservation. Conservation planning is composed of a systematic conservation assessment coupled with processes for development of an implementation strategy and stakeholder collaboration. The peer-reviewed conservation biology literature abounds with studies analyzing the performance of assessments (e.g., area-selection techniques). This information alone, however can never deliver effective conservation action; it informs conservation planning. Examples of how to translate systematic assessment outputs into knowledge and then use them for "doing" conservation are rare. South Africa has received generous international and domestic funding for regional conservation planning since the mid-1990s. We reviewed eight South African conservation planning processes and identified key ingredients of best practice for undertaking systematic conservation assessments in a way that facilitates implementing conservation action. These key ingredients include the design of conservation planning processes, skills for conservation assessment teams, collaboration with stakeholders, and interpretation and mainstreaming of products (e.g., maps) for stakeholders. Social learning institutions are critical to the successful operationalization of assessments within broader conservation planning processes and should include not only conservation planners but also diverse interest groups, including rural landowners, politicians, and government employees.

  8. Creating a bridge between data collection and program planning: a technical assistance model to maximize the use of HIV/AIDS surveillance and service utilization data for planning purposes.

    PubMed

    Logan, Jennifer A; Beatty, Maile; Woliver, Renee; Rubinstein, Eric P; Averbach, Abigail R

    2005-12-01

    Over time, improvements in HIV/AIDS surveillance and service utilization data have increased their usefulness for planning programs, targeting resources, and otherwise informing HIV/AIDS policy. However, community planning groups, service providers, and health department staff often have difficulty in interpreting and applying the wide array of data now available. We describe the development of the Bridging Model, a technical assistance model for overcoming barriers to the use of data for program planning. Through the use of an iterative feedback loop in the model, HIV/AIDS data products constantly are evolving to better inform the decision-making tasks of their multiple users. Implementation of this model has led to improved data quality and data products and to a greater willingness and ability among stakeholders to use the data for planning purposes.

  9. Economic analysis of standard interface modules for use with the multi-mission spacecraft, volume 1

    NASA Technical Reports Server (NTRS)

    1976-01-01

    A preliminary technical and economic feasibility study was made of the use of Standardized Interstate Modules (SIM) to perform electual interfacing functions that were historically incorporated into sensors. Sensor interface functions that are capable of standardization from the set of missions planned for the NASA Multi-Mission Spacecraft (MMS) in the 1981 to 1985 time period were identified. The cost savings that could be achieved through the replacement of nonstandard sensor interface flight hardware that might be used in these missions with SIM were examined.

  10. Choice of noxious facilities: case of a solid waste incinerator versus a sanitary landfill in Malaysia.

    PubMed

    Othman, Jamal; Khee, Pek Chuen

    2014-05-01

    A choice experiment analysis was conducted to estimate the preference for specific waste disposal technologies in Malaysia. The study found that there were no significant differences between the choice of a sanitary landfill or an incinerator. What matters is whether any disposal technology would lead to obvious social benefits. A waste disposal plan which is well linked or integrated with the community will ensure its acceptance. Local authorities will be challenged to identify solid waste disposal sites that are technically appropriate and also socially desirable.

  11. NASA management of the Space Shuttle Program

    NASA Technical Reports Server (NTRS)

    Peters, F.

    1975-01-01

    The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.

  12. Summary Report: Risk Assessment Forum Technical Workshop on Population-level Ecological Risk Assessment

    EPA Pesticide Factsheets

    2008 technical workshop regarding development of additional guidelines or best practices for planning, implementing and interpreting ecological risk assessments that involve population-level assessment endpoints.

  13. Strategic plan for infrastructure optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donley, C.D.

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructuremore » and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.« less

  14. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... projects of the Plan, including pilot projects and operational elements, based on the best scientific, technical, funding, contracting, and other information available. The Corps of Engineers and the South...

  15. [Philanthropic hospitals and the operation of provider-owned health plans in Brazil].

    PubMed

    Lima, Sheyla Maria Lemos; Portela, Margareth C; Ugá, Maria Alicia Dominguez; Barbosa, Pedro Ribeiro; Gerschman, Silvia; Vasconcellos, Miguel Murat

    2007-02-01

    To describe the management performance of philanthropic hospitals that operate their own health plans, in comparison with philanthropic hospitals as a whole in Brazil. The managerial structures of philanthropic hospitals that operated their own health plans were compared with those seen in a representative group from the philanthropic hospital sector, in six dimensions: management and planning, economics and finance, human resources, technical services, logistics services and information technology. Data from a random sample of 69 hospitals within the philanthropic hospital sector and 94 philanthropic hospitals that operate their own health plans were evaluated. In both cases, only the hospitals with less than 599 beds were included. The results identified for the hospitals that operate their own health plans were more positive in all the managerial dimensions compared. In particular, the economics and finance and information technology dimensions were highlighted, for which more than 50% of the hospitals that operated their own health plans presented almost all the conditions considered. The philanthropic hospital sector is important in providing services to the Brazilian Health System (SUS). The challenges in maintaining and developing these hospitals impose the need to find alternatives. Stimulation of a public-private partnership in this segment, by means of operating provider-owned health plans or providing services to other health plans that work together with SUS, is a field that deserves more in-depth analysis.

  16. Research and Technology Objectives and Plans Summary (RTOPS)

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The NASA Research and Technology program for FY 1978 is represented by this compilation of the 'Summary' portions of each of the Research and Technology Objectives and Plans (RTOPS). The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section contains citations and abstracts of the RTOPs. Following this section are four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.

  17. Defense Technical Information Center (DTIC) - Its role in the USAF Scientific and Technical Information Program

    NASA Technical Reports Server (NTRS)

    Kuhn, Allan D.

    1991-01-01

    The Defense Technical Information Center (DTIC), the central repository for DOD scientific and technical information concerning studies and research and engineering efforts, is discussed. The present makeup of DTIC is described and its functions in producing technical reports and technical report bibliographies are examined. DTIC's outreach services are reviewed, as are its DTIC information and technology transfer programs. DTIC's plans for the year 2000 and its relation to the mission of the U.S. Air Force, including the Air Force's STINFO program, are addressed.

  18. Environment, Safety and Health Self-Assessment Report Fiscal Year 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, Scott

    2011-03-23

    The Lawrence Berkeley National Laboratory (LBNL) Environment, Safety, and Health (ES&H) Self-Assessment Program was established to ensure that Integrated Safety Management (ISM) is implemented institutionally and by all divisions. The ES&H Self-Assessment Program, managed by the Office of Contractor Assurance (OCA), provides for an internal evaluation of all ES&H programs and systems at LBNL. The primary objective of the program is to ensure that work is conducted safely and with minimal negative impact to workers, the public, and the environment. Self-assessment follows the five core functions and guiding principles of ISM. Self-assessment is the mechanism used to promote the continuousmore » improvement of the Laboratory's ES&H programs. The process is described in the Environment, Safety, and Health Assurance Plan (PUB-5344) and is composed of three types of self-assessments: Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review. The Division ES&H Self-Assessment Manual (PUB-3105) provides the framework by which divisions conduct formal ES&H self-assessments to systematically identify program deficiencies. Issue-specific assessments are designed and implemented by the divisions and focus on areas of interest to division management. They may be conducted by teams and involve advance planning to ensure that appropriate resources are available. The ES&H Technical Assurance Program Manual (PUB-913E) provides the framework for systematic reviews of ES&H programs and processes. The ES&H Technical Assurance Program Assessment is designed to evaluate whether ES&H programs and processes are compliant with guiding regulations, are effective, and are properly implemented by LBNL divisions. The Division ES&H Peer Review Manual provides the framework by which division ISM systems are evaluated and improved. Peer Reviews are conducted by teams under the direction of senior division management and focus on higher-level management issues. Peer Review teams are selected on the basis of members knowledge and experience in the issues of interest to the division director. LBNL periodically requests in-depth independent assessments of selected ES&H programs. Such assessments augment LBNL's established assessment processes and provide an objective view of ES&H program effectiveness. Institutional Findings, Observations, and Noteworthy Practices identified during independent assessments are specifically intended to help LBNL identify opportunities for program improvement. This report includes the results of the Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review, respectively.« less

  19. Robot Plans and Human Plans: Implications for Models of Communication. Technical Report No. 314.

    ERIC Educational Resources Information Center

    Bruce, Bertram

    People in interaction with others organize their perceptions of a social situation in terms of plans even when the others' plans are poorly formulated. They use their models of others' plans in formulating their own. Much of what occurs in discourse centers on a continual communication about and reformulation of one's own plans and one's own…

  20. Planning for land use and conservation: Assessing GIS-based conservation software for land use planning

    Treesearch

    Rob Baldwin; Ryan Scherzinger; Don Lipscomb; Miranda Mockrin; Susan Stein

    2014-01-01

    Recent advances in planning and ecological software make it possible to conduct highly technical analyses to prioritize conservation investments and inform local land use planning. We review these tools, termed conservation planning tools, and assess the knowledge of a key set of potential users: the land use planning community. We grouped several conservation software...

  1. 78 FR 45869 - Approval and Promulgation of State Implementation Plans; State of Montana; Interstate Transport...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... of Montana's submission because the submission did not include any technical analysis to support its..., EPA disagrees with that concern. Our technical analysis confirmed that emissions from Montana in total... irrelevant factors and lacks any technical analysis to support the State's conclusion with respect to...

  2. 76 FR 14835 - Approval and Promulgation of Air Quality Implementation Plan; Missouri; Proposed Disapproval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... the state's conclusion should be supported by an adequate technical analysis. EPA recommended the...)(2)(D)(i)(I) must be supported by an adequate technical analysis.\\5\\ EPA recommended the various..., the state did not further evaluate or demonstrate with a technical analysis that these measures...

  3. 76 FR 43167 - Approval and Promulgation of Air Quality Implementation Plan; North Carolina; Disapproval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... stated that the state's conclusion should be supported by an adequate technical analysis. Second, EPA... revision must be supported by an adequate technical analysis, including, but not limited to, information... disapproval where the Agency states: ``* * * without an adequate technical analysis EPA does not believe that...

  4. 76 FR 14831 - Approval and Promulgation of Air Quality Implementation Plan; Kansas; Proposed Disapproval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... State's conclusion should be supported by an adequate technical analysis. EPA recommended the various...) must be supported by an adequate technical analysis.\\5\\ EPA recommended the various types of... evaluate or demonstrate with a technical analysis that these measures address the requirements of 110(a)(2...

  5. 76 FR 43159 - Approval and Promulgation of Air Quality Implementation Plan; Georgia; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... stated that the state's conclusion should be supported by an adequate technical analysis. Second, EPA...'' provisions, the state's SIP revision must be supported by an adequate technical analysis, including, but not..., proposed disapproval where the Agency states: ``* * * without an adequate technical analysis EPA does not...

  6. 76 FR 53638 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Infrastructure State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ...), DNREC supplemented its September 16, 2009 submittal with a technical analysis submitted to EPA for... supplemental technical analysis, for which it has requested parallel-processing, through the public notice and... submitted the technical analysis to EPA as a formal supplement to its September 16, 2009 submittal. The...

  7. 78 FR 9631 - Energy Efficiency Program for Consumer Products: Energy Conservation Standards for Residential...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... planning to conduct in-depth technical analyses in the following areas: (1) Engineering; (2) energy-use... refer to the statute as amended through the American Energy Manufacturing Technical Corrections Act... technical amendment, which was published in the Federal Register on July 28, 2008, that codified the EISA...

  8. 76 FR 43128 - Approval and Promulgation of Air Quality Implementation Plan; Alabama; Disapproval of Interstate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ..., if so, address the impact. The state's conclusion must be supported by an adequate technical analysis...'' provisions, the state's SIP revision must be supported by an adequate technical analysis, including, but not... disapproval where the Agency states: ``* * *without an adequate technical analysis EPA does not believe that...

  9. 77 FR 56555 - Approval and Promulgation of Implementation Plans; State of Missouri; Maximum Allowable Emission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... emissions impact of the clean fuels exclusion, MDNR relied on a technical analysis of emissions from units..., correspondence, referenced above, also included a technical analysis demonstrating that the averaging approach... EPA cannot read your comment due to technical difficulties and cannot contact you for clarification...

  10. 76 FR 4592 - Approval and Promulgation of Air Quality Implementation Plan; North Carolina; Disapproval of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... adequate technical analysis. Second, EPA recommended the various types of information that could be... submission, it did not further evaluate or demonstrate with a technical analysis that this measure and their.... Unfortunately, without an adequate technical analysis EPA does not believe that states can sufficiently address...

  11. 78 FR 29314 - Approval and Promulgation of State Implementation Plans; State of Utah; Interstate Transport of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ...) SIP submissions an adequate technical analysis to support their conclusions regarding interstate... acceptable modeling technical analyses are available, but EPA does not believe that modeling is required if... regional scale technical analysis, and Utah will point to that analysis in order to conclude that there are...

  12. 78 FR 47253 - Approval and Promulgation of Air Quality Implementation Plans; Maine; Oxides of Nitrogen...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ...-hour ozone standard in any area in the OTR. The State's submittals include detailed technical analyses... areas in the OTR. The State's technical analyses rely on several different techniques used to analyze... Maine's requests? Based on the ME DEP's technical analyses discussed above, EPA believes that the State...

  13. 77 FR 38509 - Approval and Promulgation of Implementation Plans; South Carolina; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Carolina's 2018 projections are based on the State's technical analysis of the anticipated emissions rates... haze technical analyses was developed by the Visibility Improvement State and Tribal Association of the... appropriate documentation in its SIP of the technical analysis it used to assess the need for and...

  14. RTO Technical Publications: A Quarterly Listing

    NASA Technical Reports Server (NTRS)

    2005-01-01

    A quarterly listing of RTO technical publications is presented. The topics include: Handbook on the Analysis of Smaller-Scale Contingency Operations in Long Term Defence Planning; 2) Radar Polarimetry and Interferometry; 3) Combat Casualty Care in Ground-Based Tactical Situations: Trauma Technology and Emergency Medical Procedures; and 4) RTO Technical Publications: A Quarterly Listing

  15. 75 FR 16817 - Meeting for Software Developers on the Technical Specifications for Common Formats for Patient...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... Software Developers on the Technical Specifications for Common Formats for Patient Safety Data Collection... software developers can provide input on these technical specifications for the Common Formats Version 1.1... specifications, which provide direction to software developers that plan to implement the Common Formats...

  16. 77 FR 34354 - Notice Inviting Informal Public Comment on Training and Technical Assistance and Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... and Technical Assistance and Disability Inclusion Programming AGENCY: Corporation for National and... implementation of a unified training and technical assistance (TTA) strategy and disability inclusion programming... to CNCS as we plan and prepare for this work. We will accept comments in writing, as described below...

  17. An ergonomic approach to improve work conditions of older employees in social housing.

    PubMed

    Biquand, Sylvain; Heddad, Nadia

    2012-01-01

    French companies are legally required to develop action plans to improve employment and work conditions for older workers ("plans seniors"). These plans contain measures oriented towards recruiting, career evolution, skills developme1nt, knowledge transmission and improvement of work conditions. A tool for assessing work situations experienced by council buildings caretakers ("gardiens") was used in such a plan on behalf of the main agency of council housing in Paris, and we developed. This assessment tool was developed after ergonomic work analysis on a sample of 36 older caretakers (age > 57 y.o). The technical inspectors in charge of technical interventions on buildings and managing caretakers were trained to use the assessment tool and apply it to all caretakers aged 50 and over.

  18. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  19. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  20. North Dakota Metropolitan Planning Organization's peer exchange on introducing performance management into the MPO planning process : A TPCB Exchange

    DOT National Transportation Integrated Search

    1997-02-01

    This technical memorandum was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national progr...

  1. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  2. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  3. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  4. 34 CFR 200.27 - Development of a schoolwide program plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Development of a schoolwide program plan. (a)(1) A school operating a schoolwide program must develop a comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the comprehensive plan in consultation with the LEA and its school support team or other technical assistance...

  5. Using Strategic Planning To Improve Rural Schools.

    ERIC Educational Resources Information Center

    D'Amico, Joseph J.

    This paper describes the elements of strategic planning and applies them to educational reform and improvement. The paper also describes how a planning model, Strategic Planning for Educational Reform and Improvement (SPERI), was used by Rural Assistance Councils (RACs) in Pennsylvania and Delaware, with technical assistance from Research for…

  6. "Between Rationality and Politics": Autobiographical Portraits of Adult Education Programme Planning.

    ERIC Educational Resources Information Center

    McLean, Scott

    2000-01-01

    Contrasts two models of adult education program planning: (1) the technical rational model, which asserts that planning is rational application of decision-making processes; and (2) the political model, which views planning as negotiation of personal and organizational interests. Finds a place for both political sensitivity and technical…

  7. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  8. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  9. 7 CFR 634.23 - Water quality plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  10. 39 CFR 3002.12 - Office of Rates, Analysis, and Planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Office of Rates, Analysis, and Planning. 3002.12... Rates, Analysis, and Planning. (a) The Office of Rates, Analysis, and Planning is responsible for technical (as opposed to legal) analysis and the formulation of policy recommendations for the Commission...

  11. 39 CFR 3002.12 - Office of Rates, Analysis, and Planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Office of Rates, Analysis, and Planning. 3002.12... Rates, Analysis, and Planning. (a) The Office of Rates, Analysis, and Planning is responsible for technical (as opposed to legal) analysis and the formulation of policy recommendations for the Commission...

  12. Numerical arc segmentation algorithm for a radio conference: A software tool for communication satellite systems planning

    NASA Technical Reports Server (NTRS)

    Whyte, W. A.; Heyward, A. O.; Ponchak, D. S.; Spence, R. L.; Zuzek, J. E.

    1988-01-01

    The Numerical Arc Segmentation Algorithm for a Radio Conference (NASARC) provides a method of generating predetermined arc segments for use in the development of an allotment planning procedure to be carried out at the 1988 World Administrative Radio Conference (WARC) on the Use of the Geostationary Satellite Orbit and the Planning of Space Services Utilizing It. Through careful selection of the predetermined arc (PDA) for each administration, flexibility can be increased in terms of choice of system technical characteristics and specific orbit location while reducing the need for coordination among administrations. The NASARC software determines pairwise compatibility between all possible service areas at discrete arc locations. NASARC then exhaustively enumerates groups of administrations whose satellites can be closely located in orbit, and finds the arc segment over which each such compatible group exists. From the set of all possible compatible groupings, groups and their associated arc segments are selected using a heuristic procedure such that a PDA is identified for each administration. Various aspects of the NASARC concept and how the software accomplishes specific features of allotment planning are discussed.

  13. Science and Engineering Technical Assessments (SETA) Program

    NASA Technical Reports Server (NTRS)

    Huy, Frank

    2000-01-01

    This document provides a project plan for the D.N. American response to Modification #1 to Contract Task Order #13 - Program Maintenance and Logistics for the Science and Engineering Technical Assessments (SETA) contract.

  14. Goddard Geophysical and Astronomical Observatory

    NASA Technical Reports Server (NTRS)

    Covey, Rawland; Kodak, Charles

    1999-01-01

    This report summarizes the technical parameters and the technical staff of the VLBI system at GGAO. It also gives an overview of VLBI activities during the previous year. The outlook lists the tasks planned for 1999.

  15. Methods for Aquifer Thermal Energy Storage planning; The hidden side of cities.

    NASA Astrophysics Data System (ADS)

    Jaxa-Rozen, M.; Bloemendal, M.; Theo, O.

    2017-12-01

    Aquifer Thermal Energy Storage (ATES) systems reduce energy use and greenhouse gas emissions in urban areas, by supplying heating and cooling to buildings with a heat pump combined with seasonal heat storage in aquifers. The climactic and geohydrological conditions required for this technology can be found in many temperate regions around the world; In The Netherlands there are currently approximately 2,200 active systems. Despite this modest adoption level, many urban areas in the Netherlands already struggle to accommodate the subsurface claims needed to further develop ATES under current planning regulations. To identify best practices for ATES planning and maximize the technology's future potential, this work first reviews a set of 24 ATES-plans which were used for the spatial layout of ATES in various urban areas in The Netherlands and the method used to make those plans. This analysis revealed that three crucial elements are found to be missing in current ATES planning: i) a consistent assessment framework which can be used to compare the performance of different planning strategies; ii) a systematic adjustment of ATES design parameters to suit local conditions; iii) the identification and use of aquifer allocation thresholds to guide the choice of a planning strategy. All three steps are elaborated and added to the method. For the latter, these thresholds are identified by exploratory numerical modelling, using a coupled agent-based/geohydrological (MODFLOW) simulation to explore a broad range of scenarios for ATES design and layout parameters. The results give insight in how technical ATES-well design choices affect optimal use of subsurface space and in the trade-of between individual efficiency and overall emission reductions. The improved ATES-planning method now fosters planning and design rules ensuring optimal and sustainable use of subsurface space, i.e. maximizing energy saving by accommodating as much ATES systems as possible while maintaining individual well efficiency.

  16. Interpretation and Manipulation in Human Plans. Technical Report No. 317.

    ERIC Educational Resources Information Center

    Newman, Denis; Bruce, Bertram

    Analysis of students' interpretations of a complex episode of social interaction was used to illustrate three features of human plans that distinguish them from robot plans and that form a basis for a theory of the development of social action. The features illustrated are that (1) human plans are social, (2) human plans operate on…

  17. Dish Stirling solar receiver program

    NASA Technical Reports Server (NTRS)

    Haglund, R. A.

    1980-01-01

    A technology demonstration of a Dish Stirling solar thermal electric system can be accomplished earlier and at a much lower cost than previous planning had indicated by employing technical solutions that allow already existing hardware, with minimum modifications, to be integrated into a total system with a minimum of development. The DSSR operates with a modified United Stirling p-40 engine/alternator and the JPL Test Bed Concentrator as a completely integrated solar thermal electric system having a design output of 25 kWe. The system is augmented by fossil fuel combustion which ensures a continuous electrical output under all environmental conditions. Technical and economic studies by government and industry in the United States and abroad identify the Dish Stirling solar electric system as the most appropriate, efficient and economical method for conversion of solar energy to electricity in applications when the electrical demand is 10 MWe and less.

  18. Communication satellites to enter a new age of flexibility

    NASA Astrophysics Data System (ADS)

    Balty, Cédric; Gayrard, Jean-Didier; Agnieray, Patrick

    2009-07-01

    To cope with the economical and technical evolutions of the communication market and to better compete with or complement terrestrial networks, satellite operators are requiring more flexible satellites. It allows a better fleet planning potential and back-up policy, a more standardized and efficient procurement process, mission adaptation to market evolution and the possibility of early entry in new markets. New technologies that are developed either for terrestrial networks or for space defense applications would become soon available to satellite and equipment manufacturers. A skilful mix of these new technologies with the older and more mature ones should boost satellite performances and bring flexibility to the new generation of communication satellites. This paper reviews the economical and technical environment of the space communication business for the next decade. It identifies the needs and levels of flexibility that are required by the market but also allowed by technologies, in both a top-down and bottom-up approach.

  19. Commissioning and comprehensive quality assurance of commercial 3D treatment planning system using IAEA Technical Report Series-430.

    PubMed

    Jamema, S V; Upreti, R R; Sharma, S; Deshpande, D D

    2008-09-01

    The purpose of this work is to report the results of commissioning and to establish a quality assurance (QA) program for commercial 3D treatment planning system (TPS) based on IAEA Technical Report Series 430. Eclipse v 7.3.10, (Varian Medical Systems, Palo Alto, CA, U.S.A.) TPS was commissioned for a Clinac 6EX (Varian Medical Systems, Palo Alto, CA, USA) linear accelerator. CT images of a phantom with various known in-homogeneities were acquired. The images were transferred to TPS and tested for various parameters related to patient data acquisition, anatomical modeling, plan evaluation and dose calculation. Dosimetric parameters including open, asymmetric and wedged shaped fields, oblique incidence, buildup region behavior and SSD dependence were evaluated. Representative clinical cases were tested for MU calculation and point doses. The maximum variation between the measured and the known CT numbers was 20 +/- 11.7 HU (1 SD). The results of all non-dosimetric tests were found within tolerance, however expansion at the sharp corners was found distorted. The accuracy of the DVH calculations depends on the grid size. TPS calculations of all the dosimetric parameters were in good agreement with the measured values, however for asymmetric open and wedged fields, few points were found out of tolerance. Smaller grid size calculation showed better agreement of dose calculation in the build-up region. Independent tests for MU calculation showed a variation within +/-2% (relative to planning system), meanwhile variation of 3.0% was observed when the central axis was blocked. The test results were in agreement with the tolerance specified by IAEA TRS 430. A subset of the commissioning tests has been identified as a baseline data for an ongoing QA program.

  20. USDOT’s Intelligent Transportation Systems (ITS) ITS strategic plan, 2015-2019.

    DOT National Transportation Integrated Search

    2014-05-01

    This document constitutes the Intelligent Transportation Systems Strategic Plan covering the years 2015 to 2019; it builds on the progress of the 2010-2014 plan and presents a wide array of technical, policy, institutional, and organizational concept...

Top