Sample records for plan master schedule

  1. IDC Integrated Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  2. The Composition of the Master Schedule

    NASA Technical Reports Server (NTRS)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  3. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less

  4. Master plan nurse duty roster using the 0-1 goal programming technique

    NASA Astrophysics Data System (ADS)

    Ismail, Wan Rosmanira; Jenal, Ruzzakiah

    2013-04-01

    The scheduling of nurses is particularly challenging because of the nature of the work which is around the clock. In addition, inefficient duty roster can have an effect on the nurses well being as well as their job satisfaction. In nurse scheduling problem (NSP), nurses are generally allocated to periods of work over a specified time horizon. A typical length of the schedule varies from a few weeks to a month. The schedule will be consistently rebuilt after the specified time period and will result in a time-consuming task for the administrative staff involved. Moreover, the task becomes overwhelming when the staff needs to consider the previous duty rosters in order to maintain the quality of schedules. Therefore, this study suggests the development of a master plan for a nurse duty roster for approximately one year. The master plan starts with the development of a blue print for the nurse duty roster using a 0-1 goal programming technique. The appropriate working period for this blue print is formulated based on the number of night shifts and the number of required nurses for night shift per schedule. Subsequently, the blue print is repeated to complete the annual nurse duty roster. These newly developed procedures were then tested on several data sets. The test results found that the master plan has successfully distributed the annual workload evenly among nurses. In addition, the master plan allows nurses to arrange their career and social activities in advance.

  5. Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) schedule plan

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This report describes Aerojet's methods and procedures used to control and administer contractual schedules for the EOS/AMSU-A program. Included are the following: the master, intermediate, and detail schedules; critical path analysis; and the total program logic network diagrams.

  6. Austin Community College Comprehensive Master Plan, 2000-2001.

    ERIC Educational Resources Information Center

    Austin Community Coll., TX.

    This document describes Austin Community College's (Texas) educational academic plans, facilities plans, and financial implementation plans for 2000-2001. Plan goals and priorities include: (1) enhancing scheduling efficiency while responding to unmet student demand and community needs, and increasing enrollments by 3-5%; (2) opening two…

  7. Integrated Logistics Support Plan (ILSP) for the Ports and Waterways Safety System (PAWSS) Project - A Level I Major Acquisition

    DOT National Transportation Integrated Search

    1997-09-30

    This Integrated Logistics Support Plan (ILSP) serves as the master logistics planning document that describes necessary logistic activities, assigns responsibility for those activities, and establishes a schedule for completion. It is one of the init...

  8. Modular space station phase B extension program master plan

    NASA Technical Reports Server (NTRS)

    Munsey, E. H.

    1971-01-01

    The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

  9. The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

    NASA Technical Reports Server (NTRS)

    Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.

    1981-01-01

    The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

  10. What to Do until the Microprocesser Arrives.

    ERIC Educational Resources Information Center

    Barzilla, Frank

    1983-01-01

    Advises administrators how to develop an energy master plan and how to reduce the usage of heating, ventilating, and air conditioning (HVAC) systems by means of a time clock, thermostat, and a scheduled preventive maintenance program. (MLF)

  11. Flying a College on the Computer. The Use of the Computer in Planning Buildings.

    ERIC Educational Resources Information Center

    Saint Louis Community Coll., MO.

    Upon establishment of the St. Louis Junior College District, it was decided to make use of computer si"ulation facilities of a nearby aero-space contractor to develop a master schedule for facility planning purposes. Projected enrollments and course offerings were programmed with idealized student-teacher ratios to project facility needs. In…

  12. Research on the ITOC based scheduling system for ship piping production

    NASA Astrophysics Data System (ADS)

    Li, Rui; Liu, Yu-Jun; Hamada, Kunihiro

    2010-12-01

    Manufacturing of ship piping systems is one of the major production activities in shipbuilding. The schedule of pipe production has an important impact on the master schedule of shipbuilding. In this research, the ITOC concept was introduced to solve the scheduling problems of a piping factory, and an intelligent scheduling system was developed. The system, in which a product model, an operation model, a factory model, and a knowledge database of piping production were integrated, automated the planning process and production scheduling. Details of the above points were discussed. Moreover, an application of the system in a piping factory, which achieved a higher level of performance as measured by tardiness, lead time, and inventory, was demonstrated.

  13. Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.

  14. The effects of signalled and unsignalled lick-dependent delays on the development of schedule-induced drinking in rats.

    PubMed

    Pellon, R; Blackman, D E

    1991-02-01

    Food pellets were programmed to be delivered to rats every 60 sec (Fixed Time 60-sec schedule), and the development of schedule-induced drinking was measured in terms of the amount of water consumed and the number of licks per inter-pellet interval. For some rats (masters) 10-sec delays in food delivery were dependent on licks. Yoked-control rats received food at the same time as their masters and independently of their own behaviour. In Experiment 1, in which the delays were signalled by a blackout, the master rats began to drink, but this schedule-induced behaviour then decreased to levels lower than those shown by the yoked controls. When the signalled delays were discontinued, the drinking of the master rats recovered. In Experiment 2, in which the delays were not signalled, the master rats did not develop as much schedule-induced drinking as the yoked controls, and discontinuing the delays led to only small increases in drinking. These results support the view that schedule-induced drinking is subject to control by its consequences.

  15. 77 FR 66794 - Proposed Information Collection; Comment Request; Generic Clearance for Master Address File (MAF...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... to measure the quality of the MAF. Test 22 is currently a one-time project scheduled for fiscal year... designed to be kept up-to-date, thereby eliminating the need to develop a completely new address list for future censuses and surveys. The Census Bureau plans to use the MTdb [[Page 66795

  16. Room Use for Group Instruction in Regularly Scheduled Classes.

    ERIC Educational Resources Information Center

    Phay, John E.; McCary, Arthur D.

    A method by which accurate accounting by computer might be made of apace and room use by regularly scheduled classes in institutions of higher learning is furnished. Based on well-defined terms, a master room schedule and a master course schedule are prepared on computer cards. This information is then compared with the reported individual room…

  17. Using System Architecture, Review Entry Criteria, and Standard Work Package Data to Enable Rapid Development of Integrated Master Schedules

    DTIC Science & Technology

    2016-03-01

    ENTRY CRITERIA, AND STANDARD WORK PACKAGE DATA TO ENABLE RAPID DEVELOPMENT OF INTEGRATED MASTER SCHEDULES by Burton W. Porter Jr. March 2016...2. REPORT DATE March 2016 3. REPORT TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE USING SYSTEM ARCHITECTURE, REVIEW ENTRY ... ENTRY CRITERIA, AND STANDARD WORK PACKAGE DATA TO ENABLE RAPID DEVELOPMENT OF INTEGRATED MASTER SCHEDULES Burton W. Porter Jr. Civilian

  18. A Program Master Schedule Can Improve Results

    DTIC Science & Technology

    2014-02-01

    A Program Master Schedule Can Improve Results Patrick K. Barker “There cannot be a crisis today; my schedule is already full.” —Henry Kissinger...often necessary—for clear communication . However, over-reliance on eye-pleasing graphics risks projecting a false impression of SA over a dy- namic...for poor scheduling discipline, lack of believability and/or poor communication . As the saying goes, garbage in equals garbage out. On the other

  19. How to Build the Master Schedule in 10 Easy Steps: A Guide for Secondary School Administrators

    ERIC Educational Resources Information Center

    Kussin, Steven S.

    2007-01-01

    This book is an incredibly valuable resource to anyone involved in building a master schedule. The author provides a comprehensive description of the processes involved and makes the reader aware of what needs to be considered and done throughout the process. One of the most time-consuming tasks for school leaders is creating a master schedule…

  20. Office of the Secretary of Defense Research, Development Test and Evaluation, Development and Test Evaluation, Defense, Director of Operational Test and Evaluation Defense, FY 1994 Budget Estimates, Justification of Estimates Submitted to Congress April 1993

    DTIC Science & Technology

    1993-04-01

    separation capability. o Demonstrate advanced KKVs in the 6-20 KG weight class. o Test planning for SRAM/LEAP and PATRIOT/LEAP integrated technology...packaging techniques to reduce satellite size, weight , power, and total system costs. Further development of these technologies are absolutely 4...1993 o Developed a master plan with a delivery schedule for each light- weight subassembly in the sensor integration payload. o Finalized a contract for

  1. Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

    DTIC Science & Technology

    2016-03-08

    limited. Yet, it is not too late to examine the carrier’s acquisition history to illustrate the dynamics of shipbuilding—and weapon system—acquisition...rates and the investments needed by the shipbuilder to achieve these efficiencies.31 Later in the hearing, Stackley testified that the history in...for all work packages in accordance with the integrated master schedule;  zero delinquent engineering and planning products;  resolution of

  2. United States Air Force Computer-Aided Acquisition and Logistics Support (CALS) Evolution of Computer Integrated Manufacturing (CIM) Technologies

    DTIC Science & Technology

    1988-11-01

    Manufacturing System 22 4. Similar Parts Based Shape or Manufactuting Process 24 5. Projected Annual Unit Robot Sales and Installed Base Through 1992 30 6. U.S...effort needed to perform personnel, product design, marketing , and advertising, and finance tasks of the firm. Level III controls the resource...planning and accounting functions of the firm. Systems at this level support purchasing, accounts payable, accounts receivable, master scheduling and sales

  3. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  4. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  5. The 30/20 GHz demonstration system SSUS-D/BSE

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The systems consisting of a 30/20 GHz communication satellite featuring a multiple fixed beam and scanning beam antenna, SS-TDMA, onboard processing and high power TWT's and IMPATT amplifiers, a trunking space-diversity Earth station, a customer premise system (CPS) portable Earth station and a Master Control Station. Hardware, software and personnel are included to build and launch one satellite and to carry on a two year experimentation and demonstration period of advanced Ka-band systems concepts and technology. Included are first level plans identifying all tasks, a schedule for system development and an assessment of critical technology and risk and a preliminary experiments plan.

  6. Food-deprivation effects on punished schedule-induced drinking in rats.

    PubMed Central

    Lamas, E; Pellón, R

    1995-01-01

    Food-deprived rats (at 80% of their free-feeding weights) were exposed to a fixed-time 60-s schedule of food-pellet presentation and developed schedule-induced drinking. Lick-dependent signaled delays (10 s) to food presentation led to decreased drinking, which recovered when the signaled delays were discontinued. A major effect of this punishment contingency was to increase the proportion of interpellet intervals without any licks. The drinking of yoked control rats, which received food at the same times as those exposed to the signaled delay contingency (masters), was not consistently reduced. When food-deprivation level was changed to 90%, all master and yoked control rats showed decreases in punished or unpunished schedule-induced drinking. When the body weights were reduced to 70%, most master rats increased punished behavior to levels similar to those of unpunished drinking. This effect was not observed for yoked controls. Therefore, body-weight loss increased the resistance of schedule-induced drinking to reductions by punishment. Food-deprivation effects on punished schedule-induced drinking are similar to their effects on food-maintained lever pressing. This dependency of punishment on food-deprivation level supports the view that schedule-induced drinking can be modified by the same variables that affect operant behavior in general. PMID:7622981

  7. Nuclear Weapons: NNSA Has a New Approach to Managing the B61-12 Life Extension, but a Constrained Schedule and Other Risks Remain

    DTIC Science & Technology

    2016-02-01

    components. In 2010, they began an LEP to consolidate four versions of a legacy nuclear weapon, the B61 bomb , into a bomb called the B61-12 (see...Force Integrated Master Schedule BIMS Boeing Integrated Master Schedule B61 bomb B61 legacy bomb CD critical decision Cost Guide GAO Cost...are versions of the B61 bomb , an aircraft-delivered weapon that is a key component of the United States’ commitments to the North Atlantic Treaty

  8. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING..., Application and Modification Procedures § 632.22 Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in...

  9. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  10. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 2 2012-01-01 2012-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  11. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 2 2013-01-01 2013-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  12. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 2 2014-01-01 2014-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  13. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 2 2011-01-01 2011-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  14. Conceptual Design of an In-Space Cryogenic Fluid Management Facility

    NASA Technical Reports Server (NTRS)

    Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.

    1981-01-01

    The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is presented. The proposed facility consisting of a supply tank, receiver tank, pressurization system, instrumentation, and supporting hardware, is described. The experimental objectives, the receiver tank to be modeled, and constraints imposed on the design by the space shuttle, Spacelab, and scaling requirements, are described. The conceptual design, including the general configurations, flow schematics, insulation systems, instrumentation requirements, and internal tank configurations for the supply tank and the receiver tank, is described. Thermal, structural, fluid, and safety and reliability aspects of the facility are analyzed. The facility development plan, including schedule and cost estimates for the facility, is presented. A program work breakdown structure and master program schedule for a seven year program are included.

  15. Rotorcraft master plan

    NASA Technical Reports Server (NTRS)

    Hwoschinsky, Peter V.

    1992-01-01

    The Rotorcraft Master Plan contains a comprehensive summary of active and planned FAA vertical flight research and development. Since the Master Plan is not sufficient for tracking project status and monitoring progress, the Vertical Flight Program Plan will provide that capability. It will be consistent with the Master Plan and, in conjunction with it, will serve to ensure a hospitable environment if the industry presents a practical vertical-flight initiative.

  16. Contrast and autoshaping in multiple schedules varying reinforcer rate and duration.

    PubMed

    Hamilton, B E; Silberberg, A

    1978-07-01

    Thirteen master pigeons were exposed to multiple schedules in which reinforcement frequency (Experiment I) or duration (Experiment II) was varied. In Phases 1 and 3 of Experiment I, the values of the first and second components' random-interval schedules were 33 and 99 seconds, respectively. In Phase 2, these values were 99 seconds for both components. In Experiment II, a random-interval 33-second schedule was associated with each component. During Phases 1 and 3, the first and second components had hopper durations of 7.5 and 2.5 seconds respectively. During Phase 2, both components' hopper durations were 2.5 seconds. In each experiment, positive contrast obtained for about half the master subjects. The rest showed a rate increase in both components (positive induction). Each master subject's key colors and reinforcers were synchronously presented on a response-independent basis to a yoked control. Richer component key-pecking occurred during each experiment's Phases 1 and 3 among half these subjects. However, none responded during the contrast condition (unchanged component of each experiment's Phase 2). From this it is inferred that autoshaping did not contribute to the contrast and induction findings among master birds. Little evidence of local contrast (highest rate at beginning of richer component) was found in any subject. These data show that (a) contrast can occur independently from autoshaping, (b) contrast assays during equal-valued components may produce induction, (c) local contrast in multiple schedules often does not occur, and (d) differential hopper durations can produce autoshaping and contrast.

  17. Yavapai College Integrated Master Plan.

    ERIC Educational Resources Information Center

    Yavapai Coll., Prescott, AZ.

    This integrated master plan for Yavapai College (Arizona) includes the following six key components: (1) district services overview; (2) educational services plan; (3) human resources plan; (4) information technology services; (5) facilities plan; and (6) financial plan. The master plan was developed as a result of discussions and meetings with…

  18. Creating Partnerships for a Better Tennessee. Master Plan, 2005-2010

    ERIC Educational Resources Information Center

    Tennessee Higher Education Commission, 2010

    2010-01-01

    The Tennessee Higher Education Commission is statutorily charged to develop a statewide master plan for the future development of public higher education. In response to this, the Master Plan, "Creating Partnerships for a Better Tennessee," was developed for 2005-2010. The Master Plan is a collaborative effort with the Tennessee Board of…

  19. 20 CFR 632.23 - Termination and corrective action of a CAP and/or Master Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... and/or Master Plan. 632.23 Section 632.23 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... and Modification Procedures § 632.23 Termination and corrective action of a CAP and/or Master Plan. (a) Emergency Termination. The Department may terminate or suspend a CAP designation or Master Plan under...

  20. 20 CFR 632.23 - Termination and corrective action of a CAP and/or Master Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and/or Master Plan. 632.23 Section 632.23 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... and Modification Procedures § 632.23 Termination and corrective action of a CAP and/or Master Plan. (a) Emergency Termination. The Department may terminate or suspend a CAP designation or Master Plan under...

  1. Environmental surveillance master sampling schedule

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bisping, L.E.

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of themore » onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.« less

  2. Cabrillo College Master Plan, 2001-2004.

    ERIC Educational Resources Information Center

    Cabrillo Coll., Aptos, CA. Office of Institutional Research.

    This document presents Cabrillo College's (California) master plan for 2001 to 2004. Major steps in compiling the master plan included: conducting environmental scanning, making planning assumptions, establishing goals, identifying objectives, developing strategies, and evaluating the plan. The plan is based on six broad goals: (1) to enable…

  3. 78 FR 18584 - Ivanpah Master Holdings, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ... Master Holdings, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Ivanpah Master Holdings, LLC's application for market-based rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR part 34...

  4. 77 FR 26791 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ...-374- 09-7, 1 item, 1 temporary item). Master files of an electronic information system containing...-2012-0006, 1 item, 1 temporary item). Master files of an electronic information system used to document...-0001, 2 items, 2 temporary items). Master files and outputs of an electronic information system used to...

  5. A NEW APPROACH TO CLASS SCHEDULING. FINAL REPORT.

    ERIC Educational Resources Information Center

    CANTER, JOHN; AND OTHERS

    AN INVESTIGATION OF THE USE OF A PROTOTYPE DEVICE FOR CLASS SCHEDULING WAS MADE. THE BEEKLEY INSITE DEVICE THAT WAS STUDIED USES THE "PEEK-A-BOO" PRINCIPLE OF MATCHING COMPUTER TAPES. A TEST GROUP OF 149 GRADUATE STUDENTS WAS USED. THEIR DESIRED SCHEDULES WERE MATCHED AUTOMATICALLY AGAINST A PROPOSED MASTER SCHEDULE TO EVALUATE THE…

  6. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  7. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  8. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  9. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  10. Contrast and autoshaping in multiple schedules varying reinforcer rate and duration

    PubMed Central

    Hamilton, Bruce E.; Silberberg, Alan

    1978-01-01

    Thirteen master pigeons were exposed to multiple schedules in which reinforcement frequency (Experiment I) or duration (Experiment II) was varied. In Phases 1 and 3 of Experiment I, the values of the first and second components' random-interval schedules were 33 and 99 seconds, respectively. In Phase 2, these values were 99 seconds for both components. In Experiment II, a random-interval 33-second schedule was associated with each component. During Phases 1 and 3, the first and second components had hopper durations of 7.5 and 2.5 seconds respectively. During Phase 2, both components' hopper durations were 2.5 seconds. In each experiment, positive contrast obtained for about half the master subjects. The rest showed a rate increase in both components (positive induction). Each master subject's key colors and reinforcers were synchronously presented on a response-independent basis to a yoked control. Richer component key-pecking occurred during each experiment's Phases 1 and 3 among half these subjects. However, none responded during the contrast condition (unchanged component of each experiment's Phase 2). From this it is inferred that autoshaping did not contribute to the contrast and induction findings among master birds. Little evidence of local contrast (highest rate at beginning of richer component) was found in any subject. These data show that (a) contrast can occur independently from autoshaping, (b) contrast assays during equal-valued components may produce induction, (c) local contrast in multiple schedules often does not occur, and (d) differential hopper durations can produce autoshaping and contrast. PMID:16812081

  11. Strategic benefits of master facility plans.

    PubMed

    Shannon, K

    1996-02-01

    In recent years, many healthcare executives have stopped developing master facility plans due to some basic misconceptions about them, namely that master facility plans are too rigid or require major capital commitment. By getting past these misconceptions, healthcare executives can help their organizations develop and implement master facility plans that serve as flexible, reliable blueprints in guiding the organizations toward achieving their strategic, operational, and financial goals.

  12. Strategies for a new age : New York State's transportation master plan for 2030

    DOT National Transportation Integrated Search

    2006-01-01

    Strategies for a New Age: New York States Transportation Master Plan for 2030 is : the States comprehensive statewide transportation master plan and serves as the Federally recognized, : long range transportation plan for the State of New York ...

  13. Adapting Scheduling Programs for Educational Specifications.

    ERIC Educational Resources Information Center

    Glass, Thomas E.

    1984-01-01

    Planners of a new Arizona school used the district's existing computerized master scheduling program to identify instructional spaces needed. Total classroom needs by subject were translated into total square footage requirements. (MLF)

  14. 30. Photocopy of map. Insert, p. 138, Master Plan Report, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Photocopy of map. Insert, p. 138, Master Plan Report, 1960, Vol. II. Layton, Layton and Rohrbach, General Planning and Resource Consultants. 1960 MASTER PLAN, SHOWING PROPOSED LOCATION OF LINNAEAN HOUSE - Missouri Botanical Garden, 2345 Tower Grove Avenue, Saint Louis, Independent City, MO

  15. 31. Photocopy of map. Insert from Master Plan Notes Prepared ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photocopy of map. Insert from Master Plan Notes Prepared by Environmental Planning and Design, Pittsburgh, Pa. Original at Missouri Botanical Garden. 1972 MASTER PLAN 32. 'THE TREE,' SCULPTURE BY ALEXANDER CALDER, 1966 - Missouri Botanical Garden, 2345 Tower Grove Avenue, Saint Louis, Independent City, MO

  16. Alabama Environmental Education Master Plan.

    ERIC Educational Resources Information Center

    Alabama Environmental Quality Association, Montgomery.

    This master plan has been designed to involve and guide the citizenry and public officials of Alabama in environmental planning. Environmental awareness is one of the goals of the master plan. The publication is divided into two sections. Part one presents the Alabama environmental education philosophy, major environmental goals, and…

  17. Pennsylvania Environmental Education Master Plan. New Direction Across the State... ...For the Total Community.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Environmental Resources, Harrisburg.

    This document is Pennsylvania's master plan for environmental education (EE). It includes: (1) a list of planning principles and guidelines to enhance implementation of the master plan; (2) a flow chart illustrating feasibility, planning, action, and impact phases for the years 1983-85; (3) a summary of major recommendations; (4) a chart…

  18. GCC Master Plan, 1988-89.

    ERIC Educational Resources Information Center

    Germanna Community Coll., Locust Grove, VA.

    In 1989, Germanna Community College (GCC) developed this comprehensive master plan to strengthen its planning process. Part I provides an overview of the development of the master plan, the mission statement of the Virginia Community College System (VCCS), and the mission and purpose statements of GCC. Part II summarizes demographic trends based…

  19. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    PubMed

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  20. Low Impact Development Master Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loftin, Samuel R.

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  1. Master Plan for Education: Achieving the Santa Monica College Vision. Changing Lives through Excellence in Education for a Global Community. Revised.

    ERIC Educational Resources Information Center

    Santa Monica Coll., CA. Office of Institutional Research.

    This report is the 1999 Santa Monica College Educational Master Plan revision. In 1997, the College adopted its first formal Master Plan for Education. Every three to five years, depending on the circumstances, that plan will be completely redone. During the intervening time period, there will be annual revisions to the plan. This revision…

  2. Developing a Master Plan for Your School. School Buildings Planning, Design, and Construction Series No. 1.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on how to set up a master planning team and establish a plan for quickly completing the building process. It provides an overview of…

  3. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  4. SEA effectiveness for landscape and master planning: An investigation in Sardinia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    De Montis, Andrea, E-mail: andreadm@uniss.it; Ledda, Antonio, E-mail: antonioledda@gmail.com; Caschili, Simone, E-mail: s.caschili@ucl.ac.uk

    The Italian administrative bodies and planning agencies have embraced with mixed feedbacks the introduction of Strategic Environmental Assessment (SEA) through the European Directive 2001/42/EC. Concurrently, regional and local spatial planning practice have been characterized by a new approach inspired by landscape planning. The Italian region of Sardinia has been one of the pioneering administrative bodies in the Italian and European arena that has adopted landscape principles for the construction of its regional master plan (PPR, Piano Paesaggistico Regionale). Municipalities are now carrying out the review of their master plans to the PPR's prescriptions and indications. Against this background, the aimmore » of this paper is to assess the level of SEA implementation in the municipal master plans of Sardinia, six years after the approval of the PPR. Rooted in the SEA international literature we construct a modular and adaptable on-line survey for officers involved in the review of municipal master plans. The results show that many Sardinian municipalities have not reviewed their master plans to the PPR's regulations yet and only a few municipalities have started this review process according to the SEA procedure. - Highlights: • We study strategic environmental assessment (SEA) effectiveness on land use plans • Four SEA implementation key issues are drawn from international literature • Data collection has included an on-line survey with close and open questions • Results indicate that SEA has been poorly implemented in landscape and master plans • Weak aspects include planning alternatives, financial resources, and monitoring.« less

  5. Facility Master Plans: An Essential First Step in the Building Development Process.

    ERIC Educational Resources Information Center

    Wickerham, Wendell E.

    2002-01-01

    Discusses the importance of the facility master plan (FMP) in defining project scope and validating or challenging the work of consultants. Offers three case studies illustrating how facility master plans averted problems or led to unanticipated benefits for the colleges involved. (EV)

  6. Scheduling elective surgeries: the tradeoff among bed capacity, waiting patients and operating room utilization using goal programming.

    PubMed

    Li, Xiangyong; Rafaliya, N; Baki, M Fazle; Chaouch, Ben A

    2017-03-01

    Scheduling of surgeries in the operating rooms under limited competing resources such as surgical and nursing staff, anesthesiologist, medical equipment, and recovery beds in surgical wards is a complicated process. A well-designed schedule should be concerned with the welfare of the entire system by allocating the available resources in an efficient and effective manner. In this paper, we develop an integer linear programming model in a manner useful for multiple goals for optimally scheduling elective surgeries based on the availability of surgeons and operating rooms over a time horizon. In particular, the model is concerned with the minimization of the following important goals: (1) the anticipated number of patients waiting for service; (2) the underutilization of operating room time; (3) the maximum expected number of patients in the recovery unit; and (4) the expected range (the difference between maximum and minimum expected number) of patients in the recovery unit. We develop two goal programming (GP) models: lexicographic GP model and weighted GP model. The lexicographic GP model schedules operating rooms when various preemptive priority levels are given to these four goals. A numerical study is conducted to illustrate the optimal master-surgery schedule obtained from the models. The numerical results demonstrate that when the available number of surgeons and operating rooms is known without error over the planning horizon, the proposed models can produce good schedules and priority levels and preference weights of four goals affect the resulting schedules. The results quantify the tradeoffs that must take place as the preemptive-weights of the four goals are changed.

  7. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  8. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  9. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  10. 77 FR 5306 - Proposed Collection; Comment Request for Form 4461, 4461-A, and 4461-B

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-02

    ... comments concerning Form 4461, Application for Approval of Master or Prototype Defined Contribution Plan..., Application for Approval of Master or Prototype Plan, Mass Submitter Adopting Sponsor. DATES: Written comments... or Prototype Defined Contribution Plan; Form 4461-A, Application for Approval of Master [[Page 5307...

  11. A two-level structure for advanced space power system automation

    NASA Technical Reports Server (NTRS)

    Loparo, Kenneth A.; Chankong, Vira

    1990-01-01

    The tasks to be carried out during the three-year project period are: (1) performing extensive simulation using existing mathematical models to build a specific knowledge base of the operating characteristics of space power systems; (2) carrying out the necessary basic research on hierarchical control structures, real-time quantitative algorithms, and decision-theoretic procedures; (3) developing a two-level automation scheme for fault detection and diagnosis, maintenance and restoration scheduling, and load management; and (4) testing and demonstration. The outlines of the proposed system structure that served as a master plan for this project, work accomplished, concluding remarks, and ideas for future work are also addressed.

  12. Integrating MRP (materiel requirements planning) II and JIT to achieve world-class status.

    PubMed

    Titone, R C

    1994-05-01

    The concepts and principles of using manufacturing resource planning (MRP II) for planning are not new. Their success has been proven in numerous manufacturing companies in America. The concepts and principles of using just-in-time (JIT) inventory for execution, while more recent, have also been available for some time, and their success in Japan well documented. However, it is the effective integration of these two powerful tools that open the way to achieving world-class manufacturing status. This article will utilize a newly developed world-class manufacturing model, which will review the aspects of planning, beginning with a business plan through the production planning process and culminating with a master schedule that drives a materiel/capacity plan. The importance and interrelationship of these functions are reviewed. The model then illustrates the important aspects of executing these plans beginning with people issues, through total quality control (TQC) and pull systems. We will then utilize this new functional model to demonstrate the relationship between these various functions and the importance of integrating them with a total comprehensive manufacturing strategy that will lead to world-class manufacturing and profits.

  13. The Basic Organizing/Optimizing Training Scheduler (BOOTS): User's Guide. Technical Report 151.

    ERIC Educational Resources Information Center

    Church, Richard L.; Keeler, F. Laurence

    This report provides the step-by-step instructions required for using the Navy's Basic Organizing/Optimizing Training Scheduler (BOOTS) system. BOOTS is a computerized tool designed to aid in the creation of master training schedules for each Navy recruit training command. The system is defined in terms of three major functions: (1) data file…

  14. Hood River Production Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Toole, Patty

    1991-07-01

    The Northwest Power Planning Council's 1987 Columbia River Fish and Wildlife Program authorizes the development of artificial production facilities to raise chinook salmon and steelhead for enhancement in the Hood, Umatilla, Walla Walla, Grande Ronde and Imnaha rivers and elsewhere. On February 26, 1991 the Council agreed to disaggregate Hood River from the Northeast Oregon Hatchery Project, and instead, link the Hood River Master Plan (now the Hood River Production Plan) to the Pelton Ladder Project (Pelton Ladder Master Plan 1991).

  15. Quantized Synchronization of Chaotic Neural Networks With Scheduled Output Feedback Control.

    PubMed

    Wan, Ying; Cao, Jinde; Wen, Guanghui

    In this paper, the synchronization problem of master-slave chaotic neural networks with remote sensors, quantization process, and communication time delays is investigated. The information communication channel between the master chaotic neural network and slave chaotic neural network consists of several remote sensors, with each sensor able to access only partial knowledge of output information of the master neural network. At each sampling instants, each sensor updates its own measurement and only one sensor is scheduled to transmit its latest information to the controller's side in order to update the control inputs for the slave neural network. Thus, such communication process and control strategy are much more energy-saving comparing with the traditional point-to-point scheme. Sufficient conditions for output feedback control gain matrix, allowable length of sampling intervals, and upper bound of network-induced delays are derived to ensure the quantized synchronization of master-slave chaotic neural networks. Lastly, Chua's circuit system and 4-D Hopfield neural network are simulated to validate the effectiveness of the main results.In this paper, the synchronization problem of master-slave chaotic neural networks with remote sensors, quantization process, and communication time delays is investigated. The information communication channel between the master chaotic neural network and slave chaotic neural network consists of several remote sensors, with each sensor able to access only partial knowledge of output information of the master neural network. At each sampling instants, each sensor updates its own measurement and only one sensor is scheduled to transmit its latest information to the controller's side in order to update the control inputs for the slave neural network. Thus, such communication process and control strategy are much more energy-saving comparing with the traditional point-to-point scheme. Sufficient conditions for output feedback control gain matrix, allowable length of sampling intervals, and upper bound of network-induced delays are derived to ensure the quantized synchronization of master-slave chaotic neural networks. Lastly, Chua's circuit system and 4-D Hopfield neural network are simulated to validate the effectiveness of the main results.

  16. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less

  17. An Examination of Virginia Elementary School Principals' Scheduling Decisions Regarding Opportunities for Students to Participate in Physical Activity during the School Day

    ERIC Educational Resources Information Center

    Greve, Andrew W.

    2017-01-01

    The principal is ultimately responsible for decisions regarding the master schedule at the elementary level of education (Canady & Rettig, 2013; Young, 2008), and these scheduling decisions are influenced by multiple factors (Benamati, 2010; Harris, 2013; Howard & Rakoz, 2009). Although principals have become increasingly aware of the need…

  18. 76 FR 3209 - West Los Angeles VA Medical Center Veterans Programs Enhancement Act of 1998; Draft Master Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... Federal Register Notice announces an opportunity for public comment on the West Los Angeles (WLA... to ``Notice: Draft Master Plan.'' All comments received will be available for public inspection in...-recurring filming and single-day event agreements. The purpose of the Draft Master Plan is to satisfy the...

  19. The Economic Impact of Implementing the Cincinnati Public Schools' Facilities Master Plan on Greater Cincinnati.

    ERIC Educational Resources Information Center

    Rexhausen, Jeff

    The construction proposed in the Cincinnati Public Schools' Facilities Master Plan will have a significant impact on the greater Cincinnati, Ohio, economy. Highlights include: (1) the Facilities Master Plan of the Cincinnati Public Schools envisions a 10-year program with $985 million in construction spending. The funding of this program includes…

  20. Autonomy Architectures for a Constellation of Spacecraft

    NASA Technical Reports Server (NTRS)

    Barrett, Anthony

    2000-01-01

    Until the past few years, missions typically involved fairly large expensive spacecraft. Such missions have primarily favored using older proven technologies over more recently developed ones, and humans controlled spacecraft by manually generating detailed command sequences with low-level tools and then transmitting the sequences for subsequent execution on a spacecraft controller. This approach toward controlling a spacecraft has worked spectacularly on previous missions, but it has limitations deriving from communications restrictions - scheduling time to communicate with a particular spacecraft involves competing with other projects due to the limited number of deep space network antennae. This implies that a spacecraft can spend a long time just waiting whenever a command sequence fails. This is one reason why the New Millennium program has an objective to migrate parts of mission control tasks onboard a spacecraft to reduce wait time by making spacecraft more robust. The migrated software is called a "remote agent" and has 4 components: a mission manager to generate the high level goals, a planner/scheduler to turn goals into activities while reasoning about future expected situations, an executive/diagnostics engine to initiate and maintain activities while interpreting sensed events by reasoning about past and present situations, and a conventional real-time subsystem to interface with the spacecraft to implement an activity's primitive actions. In addition to needing remote planning and execution for isolated spacecraft, a trend toward multiple-spacecraft missions points to the need for remote distributed planning and execution. The past few years have seen missions with growing numbers of probes. Pathfinder has its rover (Sojourner), Cassini has its lander (Huygens), and the New Millenium Deep Space 3 (DS3) proposal involves a constellation of 3 spacecraft for interferometric mapping. This trend is expected to continue to progressively larger fleets. For example, one mission proposed to succeed DS3 would have 18 spacecraft flying in formation in order to detect earth-sized planets orbiting other stars. A proposed magnetospheric constellation would involve 5 to 500 spacecraft in Earth orbit to measure global phenomena within the magnetosphere. This work describes and compares three autonomy architectures for a system that continuously plans to control a fleet of spacecraft using collective mission goals instead of goals or command sequences for each spacecraft. A fleet of self-commanding spacecraft would autonomously coordinate itself to satisfy high level science and engineering goals in a changing partially-understood environment making feasible the operation of tens or even a hundred spacecraft (such as for interferometry or plasma physics missions). The easiest way to adapt autonomous spacecraft research to controlling constellations involves treating the constellation as a single spacecraft. Here one spacecraft directly controls the others as if they were connected. The controlling "master" spacecraft performs all autonomy reasoning, and the slaves only have real-time subsystems to execute the master's commands and transmit local telemetry/observations. The executive/diagnostics module starts actions and the master's real-time subsystem controls the action either locally or remotely through a slave. While the master/slave approach benefits from conceptual simplicity, it relies on an assumption that the master spacecraft's executive can continuously monitor the slaves' real-time subsystems, and this relies on high-bandwidth highly-reliable communications. Since unintended results occur fairly rarely, one way to relax the bandwidth requirements involves only monitoring unexpected events in spacecraft. Unfortunately, this disables the ability to monitor for unexpected events between spacecraft and leads to a host of coordination problems among the slaves. Also, failures in the communications system can result in losing slaves. The other two architectures improve robustness while reducing communications by progressively distributing more of the other three remote agent components across the constellation. In a teamwork architecture, all spacecraft have executives and real-time subsystems - only the leader has the planner/scheduler and mission manager. Finally, distributing all remote agent components leads to a peer-to-peer approach toward constellation control.

  1. Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and Land Use Map. USACOE, 31 December 1954 - Fort Custer Military Reservation, Bounded by Territorial, Dickman, & Longman Roads & Route 94 Business, Battle Creek, Calhoun County, MI

  2. Homeroom Activities in a College of Technology Based on the Master Plan

    NASA Astrophysics Data System (ADS)

    Fuchida, Kunihiiko; Murata, Hideaki; Yuji, Junichiro

    Homeroom (HR) activities have an important role in engineering education at technical colleges. Yatsushiro National College of Technology has made a master plan for them and has been putting the plan into practical use since 2002. This plan is comprehensive and has two main categories, social education and career guidance, both being composed of three sub-categories (e.g., self-understanding and making future plans) . Based on the master plan, each HR teacher makes his own plan for HR activities for his classroom at the beginning of the academic year. We have reached a consensus to share our practice and to improve HR activities for years to come. We also recognize that to carry out HR activities based on a master plan that reflects the school's educational goals is essential in order to train students who are well-prepared, both as engineers and as humans.

  3. Master Plan: Lake Barkley, Cumberland River, Kentucky - Tennessee.

    DTIC Science & Technology

    1983-01-01

    VASE 2 LOISVLLE7, DIXON GPM INGTAt PARK 28 PT. MA6AC STT PARR-*BCOLUMBUS BELMONT BATTLE ST PARK 10 REELFOOT LAKE STATV P-’ t ELYFREST STATE PAP, 01.6T...Plan: Lake garkley,Cumberland River, 3 Kentucky - Tennessee. Master Plan Update. 6. PERFORMING ORG. REPORT NUMBER 7- AUTHOR(s) 8. CONTRACT OR GRANT...block number) Lake Barkley, Kentucky. Interpretative programs. Cumberland River Recreation. Land Between the Lakes . Master Plan. 20. ABSTRACT (Continue

  4. Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dickerson, L.S.

    1988-05-01

    The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describesmore » the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs.« less

  5. Key Elements of a State Master Plan in Higher Education

    ERIC Educational Resources Information Center

    McHenry, Kristen L.; Flora, Bethany H.

    2017-01-01

    A master plan in higher education is developed to address the academic and workforce needs of a particular state. The master plan helps serve as the roadmap for implementation of proposed strategies to reach state goals in education and degree attainment. In Tennessee, Drive to 55 is a state-wide effort to increase the number of Tennesseans with a…

  6. Social Work Education. Report of Master Plan Committee S.

    ERIC Educational Resources Information Center

    Illinois State Board of Higher Education, Springfield. Master Plan Committee.

    This report of the Master Plan Committee on Social Work Education is part of Phase III of the Illinois Statewide Master Plan for Higher Education dealing with graduate and professional education. Part I presents an overview. Part II gives a brief description of social work and a statement of the problem. In Part III the social work manpower in the…

  7. Corridor Planning And Feasibility Analysis Corridor, Master Plan

    DOT National Transportation Integrated Search

    1996-04-01

    THE I-70 RURAL IVHS CORRIDOR MASTER PLAN IS THE GUIDANCE DOCUMENT FOR DEPLOYMENT OF THE INTELLIGENT TRANSPORTATION SYSTEM (ITS) FOR THE INTERSTATE-70 CORRIDOR FROM DENVER TO GLENWOOD SPRINGS, COLORADO. AS A WORKING DOCUMENT, THE PLAN RECOMMENDS STRAT...

  8. From Chaos to Order and Back? A Revisionist Reflection on the California Master Plan for Higher Education@50 and Thoughts about Its Future. Research & Occasional Paper Series: CSHE.7.10

    ERIC Educational Resources Information Center

    Douglass, John Aubrey

    2010-01-01

    In 1960, California developed a "master plan" for its already famed public higher education system. It was and continues to be arguably the single most influential effort to plan the future of a system of higher education in the annals of American higher education. Despite popular belief, however, the California Master Plan for Higher…

  9. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan : executive summary.

    DOT National Transportation Integrated Search

    2012-06-01

    Border Master Plans, as defined and supported by the U.S./Mexico Joint Working : Committee on Transportation Planning and Programming, the Federal Highway Administration, : and the U.S. Department of State, are comprehensive long range plans to inven...

  10. 18 CFR 708.4 - Required programs and reports.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... part of the Master Plan—Plan of Study. The work plan shall satisfy minimum standards described in this... related to implementation of the Master Plan. These recommendations shall be based on evaluation of...

  11. Career Opportunities in Texas: A Master Plan for Vocational and Technical Education (1989 Update).

    ERIC Educational Resources Information Center

    Texas State Board of Education, Austin.

    In January 1987, a Master Plan for the delivery of vocational and technical education in Texas was adopted by the State Board of Education (SBOE). The master plan details goals and strategies to assist in the development of a skilled and educated work force in Texas as the state enters the 21st century. As part of their mandated annual review…

  12. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  13. New Jersey Department of Transportation - Statewide Bicycle and Pedestrian Master Plan - June 1995

    DOT National Transportation Integrated Search

    1995-06-01

    The New Jersey Department of Transportation's Statewide Bicycle and Pedestrian Master Plan presents a collective vision, policy and action plan for improving the bicycling and walking environment throughout the state. The plan is part of a comprehens...

  14. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bisping, Lynn E.

    2007-01-31

    This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.

  15. 78 FR 69527 - Proposed Collection; Comment Request for Form 5307

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... 5307, Application for Determination for Adopters of Master or Prototype or Volume Submitter Plans... . SUPPLEMENTARY INFORMATION: Title: Application for Determination for Adopters of Master or Prototype or Volume... purpose by adopters of master or prototype or volume submitter plans. Current Actions: There are no...

  16. Fermilab | OCSR | Home

    Science.gov Websites

    Upgrade Project Fermilab Campus Master Plan Fermilab Campus & Facilities Planning Board Fermilab Chief Operations Officer, leads development of campus master planning and the associated execution of a program. The Campus Strategy identifies projects over a ten-year planning horizon to meet the projected

  17. Quality Improvement, Inventory Management, Lead Time Reduction and Production Scheduling in High-Mix Manufacturing Environments

    DTIC Science & Technology

    2017-01-13

    Quality Improvement, Inventory Management, Lead Time Reduction and Production Scheduling in High-mix Manufacturing Environments by Sean Daigle B.S...for the degree of Master of Engineering in Advanced Manufacturing and Design at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2017 c... Production Scheduling in High-mix Manufacturing Environments by Sean Daigle Submitted to the Department of Mechanical Engineering on January 13, 2017, in

  18. Master-planned in exurbia: examining the drivers and impacts of master-planned communities at the urban fringe

    Treesearch

    Jenna H. Tilt; Lee Cerveny

    2013-01-01

    Smart growth strategies of infill and compact growth in existing suburban cities will most likely not be sufficient to absorb a new US household growth in the future. To meet housing demands and preferences, master-planned communities will continue to be built in outlying exurban areas. However, little is known about the impacts these communities may have on the...

  19. The One-Year Residency Program: An Alternative Path to the Master's Degree in Social Work.

    ERIC Educational Resources Information Center

    Salmon, Robert; Walker, Joel

    1981-01-01

    At Hunter College an alternative master's program for social workers who cannot give up employment for full-time study replaces the traditional scheduling with three flexible time periods: pre-fieldwork and post-fieldwork, part-time coursework, and one-year, four-day-a-week fieldwork experience in the place of employment. (MSE)

  20. Basic Botany On-Line: A Training Tool for the Master Gardener Program.

    ERIC Educational Resources Information Center

    VanDerZanden, Ann Marie; Rost, Bob; Eckel, Rick

    2002-01-01

    A noncredit, online training module on botany was offered to participants in the Oregon Master Gardener program. The 48 participants felt the module was a useful training tool. They also noted that the convenience of completing the material at their own pace and during a time that fit into their schedule. (SK)

  1. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan.

    DOT National Transportation Integrated Search

    2012-06-01

    Border Master Plans document a regions needs and priorities, and recommend a mechanism to ensure coordination on current and planned future port of entry (POE) projects and supporting transportation infrastructure to serve the anticipated demand i...

  2. A planning language for activity scheduling

    NASA Technical Reports Server (NTRS)

    Zoch, David R.; Lavallee, David; Weinstein, Stuart; Tong, G. Michael

    1991-01-01

    Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.

  3. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... projects of the Plan, including pilot projects and operational elements, based on the best scientific, technical, funding, contracting, and other information available. The Corps of Engineers and the South...

  4. Final Environmental Assessment: For Joint Base Anacostia-Bolling Master Plan District of Columbia

    DTIC Science & Technology

    2010-09-30

    the impacts of vehicle travel and facilitate alternative modes of transportation that would reduce air pollutants . Noise: There would be...ltlb•nKM nr~t~~G.,~ StEiiubetlls Fort McNair East Potomac Pari < Poplar Point "" Joint Base Anacostia-Bolling Master Plan Environmental...Industrial $uppon Eost Potomac Pari < Poplar Point Joint Base Anacostia-Bolling Master Plan Environmental Assessment pg. 16 Several general

  5. Andrews University Master Plan for Campus Expansion and the Development Program, 1977-1985.

    ERIC Educational Resources Information Center

    Smoot, Joseph G.

    Described in detail in this partly promotional, partly informational publication are the history of campus planning, new master plan, and new capital programs of this Seventh Day Adventist institution. Numerous maps, photographs, and tables of financial and statistical data illustrate the plan. (MSE)

  6. 75 FR 8751 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ..., Administration on Aging (N1-439-09-2, 14 items, 14 temporary items). Schedules of daily activities and files of... Services, Administration on Aging (N1-439-09-4, 9 items, 8 temporary items). Master data files containing... associated with the death of active duty military personnel. Proposed for permanent retention are such...

  7. Optimizing The Scheduling Of Recruitment And Initial Training For Soldiers In The Australian Army

    DTIC Science & Technology

    2016-03-01

    SCHEDULING OF RECRUITMENT AND INITIAL TRAINING FOR SOLDIERS IN THE AUSTRALIAN ARMY by Melissa T. Joy March 2016 Thesis Advisor: Kenneth...SOLDIERS IN THE AUSTRALIAN ARMY 5. FUNDING NUMBERS 6. AUTHOR(S) Melissa T. Joy 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval...This thesis develops a master scheduling program to optimize recruitment into the Australian Army by employment category. The goal of the model

  8. The Austin Community College District Master Plan: FY 2004-2006.

    ERIC Educational Resources Information Center

    Austin Community Coll., TX.

    This Austin Community College (ACC) District Master Plan for 2004-2006 continues ACC's efforts to manage growth and change through a comprehensive planning process. The planning process was coordinated with the ACC Southern Association of Colleges and Schools (SACS) Alternate Self Study. This study addresses the following areas: (1) Fiscal…

  9. El Camino College Master Plan.

    ERIC Educational Resources Information Center

    El Camino Coll., Torrance, CA.

    This document is the educational Master Plan for El Camino Community College District. The purpose of the plan is to develop a research-based document that will be used as a foundation for decisions regarding instructional programs, support services, staffing and facilities. It is intended to serve as the basic foundation for all other plans of…

  10. California Master Plan for Migrant Education, 1976 Edition (Plan Maestro de California para Educacion Migrante, Edicion de 1976).

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Div. of Compensatory Education.

    Based on the national migrant education plan, California's master plan aims to mobilize the necessary State and Federal resources, and to unify and assist the efforts of local educational agencies to end the migrant child's failure in school. The plan includes provisions for: instructional activities on a regular and extended year basis designed…

  11. Directions. The Master Plan for McLennan Community College.

    ERIC Educational Resources Information Center

    Lowe, Carol, Ed.

    This master plan for McLennan Community College (MCC) begins with a mission statement, brief history of the college, and a summary of the planning process. The remainder of the plan lists the 67 strategic goals of the college, the strategies that will be used to attain them, and the planning context within which the goals were developed. In many…

  12. 18 CFR 708.3 - Policy, objectives, and standards.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... improved popular understanding of official studies, planning processes, and decisions. (3) In order for... participation section of the Master Plan—Plan of Study shall be developed consistent with the guidelines... Master Plan shall aim for the highest achievable standards of objectivity and thoroughness consistent...

  13. 18 CFR 708.3 - Policy, objectives, and standards.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... improved popular understanding of official studies, planning processes, and decisions. (3) In order for... participation section of the Master Plan—Plan of Study shall be developed consistent with the guidelines... Master Plan shall aim for the highest achievable standards of objectivity and thoroughness consistent...

  14. 18 CFR 708.3 - Policy, objectives, and standards.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... improved popular understanding of official studies, planning processes, and decisions. (3) In order for... participation section of the Master Plan—Plan of Study shall be developed consistent with the guidelines... Master Plan shall aim for the highest achievable standards of objectivity and thoroughness consistent...

  15. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  16. Implementing the Aquidneck Island West Side Master Plan

    EPA Pesticide Factsheets

    This report describes a technical assistance project with Aquidneck Island to develop approaches for mixed-use zoning standards, design guidelines, and review processes to implement the West Side Master Plan.

  17. 3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH CAVALRY BUILDINGS, DATED SEPTEMBER 10, 1951, SEE ARROW, DRAWING # BM-036, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  18. Foothill-De Anza Community College District, 2005: Planning for the New Millennium. Educational Master Plan, Spring 1999.

    ERIC Educational Resources Information Center

    Foothill-De Anza Community Coll. District, Los Altos Hills, CA.

    This document presents Foothill-De Anza Community College District's educational master plan. This report begins with the district's mission statement and is divided into five parts. "Preface: The Last Decade" looks at what occurred at Foothill-De Anza Community College District from 1988-98. "Plan Overview" outlines the…

  19. 107. Air defense command "master plan, basic mission plan," RCA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    107. Air defense command "master plan, basic mission plan," RCA Service Company tab no. F-1, sheet 2 of 2, dated 1 June, 1963. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  20. Master plans for pedestrian and bicycle transportation: community characteristics.

    PubMed

    Steinman, Lesley; Doescher, Mark; Levinger, David; Perry, Cynthia; Carter, Louise; Eyler, Amy; Aytur, Semra; Cradock, Angie L I; Evenson, Kelly R; Heinrich, Katie; Kerr, Jacqueline; Litt, Jill; Severcan, Yucel; Voorhees, Carolyn

    2010-03-01

    Recent research demonstrates the importance of targeting the built environment to support individual physical activity, particularly for people experiencing health disparities. Master plans to promote biking and/or pedestrians (BPMPs) are a potential method for environmental change. This descriptive study aims to provide a snapshot of plan attributes and better understand demographic, social and transportation characteristics of communities with BPMPs. We collected a census sample of BPMPs from 4 states. Population and commuting data were obtained from national statistics. 294 master plans were included, with most plans representing municipalities. 62% of plans targeted biking only, one-fifth targeted biking and walking, and 15% targeted walking only. The sampled locations have a similar demographic profile as the overall U.S. for median age and household income, people of color, high school education, and income inequality. The degree of racial diversity of sampled communities is slightly less than the U.S. average and the percentage of people who walk to work were slightly higher. Given that communities with master plans have a similar profile as the overall U.S., BPMPs could feasibly be spread to communities throughout the country. Further research is planned to describe BPMPs in detail toward informing future plan development.

  1. Master Plan for Illinois Higher Education 1991.

    ERIC Educational Resources Information Center

    Illinois State Board of Higher Education, Springfield.

    This publication is the master plan for higher education in Illinois and covers statewide goals, institutional missions, instruction, research, public service, equal opportunity and affirmative action, student financial aid, and state funding. Section I lists goals for the Illinois Higher Education and Coordination and Planning Board and describes…

  2. Master Plan for Data Processing Services, 1988-1993. Report.

    ERIC Educational Resources Information Center

    Connecticut Regional Community Colleges, Hartford. Board of Trustees.

    Developed in accordance with a legislative mandate, this master plan for Connecticut's regional community colleges provides baseline data on the current status of data processing; identifies issues, trends, and constraints; and sets forth specific plans for computing activities and services within the community college system. Introductory…

  3. Yavapai College Master Plan. Overview.

    ERIC Educational Resources Information Center

    Yavapai Coll., Prescott, AZ.

    This document provides an overview of the Yavapai College (Arizona) master plan. The plan reflects feedback from and discussions with various business, governmental, and education leaders in the community. It largely consists of recommendations for construction and renovation of college facilities. Many of the buildings at Yavapai are aging,…

  4. Housing, health and master planning: rules of engagement.

    PubMed

    Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P

    2014-04-01

    Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.

  5. Long Range Facilities Master Plan: 1986-2000, San Diego Unified School District.

    ERIC Educational Resources Information Center

    Blair, Billie; And Others

    The Long-Range Facilities Master Plan presents solution strategies and financing methods for accommodating a projected student enrollment increase of 45,000 between 1986 and 2000. This increase, plus limited financial resources, school use studies, and recent legislation, necessitated the plan. The issues include housing students, facility…

  6. 78 FR 61373 - Animal Center Master Plan Record of Decision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... propose any land use changes outside NIHAC. Therefore, the NIHAC campus is anticipated to remain... analysis, Environmental Justice will not be discussed. Visual Quality The Master Plan's land use plan provides a framework to help organize future development at NIHAC so that similar land use types are...

  7. Master Plan and Chancellors Hall Southampton College.

    ERIC Educational Resources Information Center

    Linn, Charles

    1998-01-01

    Discusses a college master plan that remodeled old buildings, added new ones, and tied roads together on a campus that had experienced a haphazard evolution. The plan included splitting large parking lots into smaller ones divided by trees and plants, moving university functions of certain buildings to other locations, and strategically locating…

  8. Master Planning: The Never-Ending Story.

    ERIC Educational Resources Information Center

    Meyer, Darrell C.

    2000-01-01

    Explains how modern technology has changed college campus master planning from a one-time event to a continuous process. Explained are how the Internet allows for greater collaboration where the most recent ideas, plans, and program documents can be posted on a website and participants can use e-mail for instant communications. (GR)

  9. Master Plan Policies for Illinois Higher Education, 1997.

    ERIC Educational Resources Information Center

    Illinois State Board of Elections, Springfield.

    This document presents new or revised master plan policy statements for various segments of Illinois higher education. Chapter 1, on statewide goals and organization, lists goals for Illinois higher education, for coordination and planning, for the Board of Higher Education membership; and briefly discusses the organizational structure of public…

  10. 75 FR 61243 - Proposed Collection; Comment Request for Form 5307

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ... 5307, Application for Determination for Adopters of Master or Prototype or Volume Submitter Plans... or Prototype or Volume Submitter Plans. OMB Number: 1545-0200. Form Number: 5307. Abstract: Employers... used as an application for this purpose by adopters of master or prototype or volume submitter plans...

  11. Evolutionary space platform concept study. Volume 3: Programmatics for manned space platform concepts

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The programmatic data for the reference concept of the Manned Space Platform is presented. Details regarding work breakdown structure (WBS) and dictionary, the facilities and equipment required to produce the modules, the project schedule and logic diagram, a preliminary assessment of environmental impacts and details regarding the estimated costs for the reference concept are included. The proposed WBS which was developed to provide summary and system level segregation of the nonrecurring and recurring portions of the Manned Space Platform project is also included. The accompanying dictionary outlines the function and activities contained within each WBS element. The facility and equipment required to produce the various modules is discussed. Generally, required equipment is within the existing state of the art although the size of some of the items to be manufactured is a consideration. A preliminary manufacturing flow was also provided. The project schedules presented consist of the Master Project Summary Schedule, the Master Project Phasing Chart and the Logic Network.

  12. Proposed Master Plan for Higher Education in New Jersey.

    ERIC Educational Resources Information Center

    New Jersey State Commission on Higher Education.

    The draft Master Plan was developed in response to requirements of the New Jersey Higher Education Restructuring Act of 1994. The plan proposes a vision and broad policy recommendations for New Jersey higher education into the next century. The focus of the plan is on the critical needs of the state and how higher education can help in addressing…

  13. An Interpretive Master Plan at the Museum of Fine Arts, Houston

    ERIC Educational Resources Information Center

    Schneider, Beth B.

    2008-01-01

    This case study presents the methods the staff at the Museum of Fine Arts, Houston used to develop and implement an interpretive master plan from 1996-2000. The process can be a model for other museums. Looking back a decade after the plan was developed provides insights into the role of interpretive plans as statements of goals, expressions of…

  14. AUA Program Master Plan. Volume 1: Overview

    DOT National Transportation Integrated Search

    1997-03-01

    The Office of Air Traffic Systems Development (AUA) Program Master Plan : summarizes the management, development approach, and status of products and : services provided by the AUA organization to fulfill its role in supporting : National Airspace Sy...

  15. Automated Scheduling of Science Activities for Titan Encounters by Cassini

    NASA Technical Reports Server (NTRS)

    Ray, Trina L.; Knight, Russel L.; Mohr, Dave

    2014-01-01

    In an effort to demonstrate the efficacy of automated planning and scheduling techniques for large missions, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] and CLASP (Compressed Large-scale Activity Scheduling and Planning) [2] to the domain of scheduling high-level science goals into conflict-free operations plans for Titan encounters by the Cassini spacecraft.

  16. [Planning driven by health priorities. Master planning criteria].

    PubMed

    Tresserras, Ricard

    2008-12-01

    With the aim of responding to a number of problems detected in health plan evaluations, a new direction has been proposed in Catalonia which would lead to the improved unification of the strategic and operational approaches, and leadership. The master plans that tackle those health problems with the greatest impact were created along these lines. This article presents the most salient aspects of the master plans for oncology, circulatory diseases, mental health and addictions, immigration and the field of social healthcare. Their organisational structure, mission and functions are presented, commenting on the prioritisation of activities and the principal benchmark elements of the healthcare model in the definition of planning criteria for services incorporated into the Health Map. Finally, mention is made of the evaluation procedures. The in-depth study of priority settings has resulted in significant progress towards unifying health and service planning.

  17. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  18. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  19. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...

  20. Directions for the '80s: Educational Master Plan. San Francisco Community College District.

    ERIC Educational Resources Information Center

    Duncan-Hall, Tyra L., Ed.

    Designed to assist staff in the San Francisco Community College District (SFCCD) in synthesizing the trends, events and issues that are likely to influence educational programs and services, this master plan assesses the district's internal and external environments and describes the SFCCD's two-phase planning process. Chapter 1 discusses the…

  1. 2004 Strategic Master Plan for Higher Education. Update on Implementation

    ERIC Educational Resources Information Center

    Washington Higher Education Coordinating Board, 2005

    2005-01-01

    The 2004 Strategic Master Plan for Higher Education identified clear and measurable goals that focused on outcomes rather than inputs alone. To reinforce this outcomes-based approach, the plan proposed that the state develop a new funding method to reward public colleges and universities for student success. Specifically, it proposed that the…

  2. Perspectives and Plans for Graduate Studies. 8. Anthropology 1974.

    ERIC Educational Resources Information Center

    Council of Ontario Universities, Toronto.

    At the present time there are two graduate programs in anthropology in Ontario. An examination of the 3-year plans submitted in 1972 revealed that several universities in Ontario were proposing master's work in anthropology. It was decided to place master's work in anthropology under provisional embargo until a "mini-planning assessment"…

  3. Challenges: The State Board of Community Colleges 1988 Master Plan.

    ERIC Educational Resources Information Center

    Florida State Board of Community Colleges, Tallahassee.

    The Florida State Board of Community Colleges' 1988 Master Plan presents current trends, challenges, and issues affecting the system in order to guide both local and state institutional development and legislation. The first section of the plan reviews population trends, indicating that: (1) population growth will be the most influential trend…

  4. Washington State Community College Capital Master Plan, 1985-91. Management Summary.

    ERIC Educational Resources Information Center

    Washington State Board for Community Coll. Education, Olympia.

    Designed for Washington State's decision makers and the trustees and administrators of the community college system, this report extracts information from the community college system's 1985-87 capital budget request and 1985-91 capital master plan to provide a brief description of the budget and plan. Introductory material discusses the…

  5. Guideline for the Comprehensive Campus Master Plan System.

    ERIC Educational Resources Information Center

    State Univ. System of Florida, Tallahassee.

    This document is a guideline for institutions in the Florida State University System to use as they comply with state mandates requiring them to develop campus master plans and land management plans. It supplements the minimum criteria in the state's Administrative Code. For each element the guide offers description of its purpose, data…

  6. Master Planning Guide for Instructional Objectives. Colorado State Plan for the Developmentally Disabled.

    ERIC Educational Resources Information Center

    Myers, Marvin L.; And Others

    Presented by the Master Planning Committee of the Colorado Department of Institutions and the Division of Developmental Disabilities is a behavior inventory of sequential skills in four areas basic to the normalization of developmentally disabled persons. Instructional objectives are listed in the following areas: physical, including perceptual…

  7. Colorado Academic Library Master Plan, Spring 1982.

    ERIC Educational Resources Information Center

    Breivik, Patricia Senn; And Others

    Based on a need to assess current library strengths and weaknesses and to project potential library roles in supporting higher education, this master plan makes a series of recommendations to Colorado's academic libraries. It is noted that the plan was endorsed by both the Colorado Commission on Higher Education and the Colorado State Department…

  8. [Preventing maternal and child malnutrition: the nutrition component of the Mesoamerican Health Initiative 2015].

    PubMed

    Rivera, Juan A; Martorell, Reynaldo; González, Wendy; Lutter, Chessa; Cossío, Teresa González de; Flores-Ayala, Rafael; Uauy, Ricardo; Delgado, Hernán

    2011-01-01

    To describe the regional master plan of nutrition to address maternal and child malnutrition in a 5- year period developed by the Nutrition Technical Group. The Nutrition Technical Group developed a situation analysis describing the main nutrition problems, policies and programs in Mesoamerica. The situation analysis and a literature review about effective interventions to address malnutrition were conducted to develop a nutrition master plan. The Nutrition Technical Group held various meetings to develop, discuss and validate the master plan. Theory of change identified problems and barriers, the actions to be developed, the changes and impacts expected. A package of interventions is proposed to reduce undernutrition and micronutrient deficiencies useful under different epidemiological contexts. The nutrition master plan provides a guideline of best practices that can be used for evidence-informed decision making and the development of national policies and programs to reduce malnutrition.

  9. Chapter 8: Planning Tools to Simulate and Optimize Neighborhood Energy Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhivov, Alexander Michael; Case, Michael Patrick; Jank, Reinhard

    This section introduces different energy modeling tools available in Europe and the USA for community energy master planning process varying from strategic Urban Energy Planning to more detailed Local Energy Planning. Two modeling tools used for Energy Master Planning of primarily residential communities, the 3D city model with CityGML, and the Net Zero Planner tool developed for the US Department of Defense installations are described in more details.

  10. On Being a Master Planner - A Step by Step Guide. From a Nationwide Study of Environmental Education Planning.

    ERIC Educational Resources Information Center

    Rocchio, Richard; Lee, Eve

    This guide demonstrates a new way of utilizing the planning process within a social movement context in view of developing a state master plan for environmental education. In addition the book serves as a guide to realistic planning, including models, definitions, and examples. The guide contains five parts: Part One - The background, Part Two -…

  11. As They Liked It: The Tragical-Comical-Pastoral Drama of Elizabethan Theatre. Curriculum Projects. The Huntington Theatre Company's Master Works Study in Shakespeare.

    ERIC Educational Resources Information Center

    Huntington Theatre Co., Boston, MA.

    Developed by the participants of the Huntington Theatre Company's Master Works Study in Shakespeare, this collection presents single lesson plans and unit plans for teaching Elizabethan drama. The collection presents 12 lesson plans (spanning one or a few days of instruction) and 15 unit plans (ranging over several weeks) suitable for secondary…

  12. A Work Force for Environment and Energy. A Master Plan for Environmental/Energy Higher Education in Illinois.

    ERIC Educational Resources Information Center

    Illinois Inst. for Environmental Quality, Chicago.

    This master plan for environmental and energy higher education in Illinois is a direct result of a mandate from the Illinois General Assembly. To prepare students to confront our nation's environmental problems, each university will submit a management and development plan, designed to preserve existing environmental values and provide…

  13. SLS-PLAN-IT: A knowledge-based blackboard scheduling system for Spacelab life sciences missions

    NASA Technical Reports Server (NTRS)

    Kao, Cheng-Yan; Lee, Seok-Hua

    1992-01-01

    The primary scheduling tool in use during the Spacelab Life Science (SLS-1) planning phase was the operations research (OR) based, tabular form Experiment Scheduling System (ESS) developed by NASA Marshall. PLAN-IT is an artificial intelligence based interactive graphic timeline editor for ESS developed by JPL. The PLAN-IT software was enhanced for use in the scheduling of Spacelab experiments to support the SLS missions. The enhanced software SLS-PLAN-IT System was used to support the real-time reactive scheduling task during the SLS-1 mission. SLS-PLAN-IT is a frame-based blackboard scheduling shell which, from scheduling input, creates resource-requiring event duration objects and resource-usage duration objects. The blackboard structure is to keep track of the effects of event duration objects on the resource usage objects. Various scheduling heuristics are coded in procedural form and can be invoked any time at the user's request. The system architecture is described along with what has been learned with the SLS-PLAN-IT project.

  14. Integration of Environmental Planning Into the Army Master Planning Process

    DTIC Science & Technology

    1992-10-01

    Creating and implementing 13 required component plans (and additional optional ones) can be unwieldy and time consuming. There is also a fair amount of...agencies. This review is to occur following internal installation review, but prior to review and approval by the Major Command (MACOM) or Headquarters...master planning regulations and guidelines is a lack of internal consistency. Through these revisions, the guidelines should be made entirely

  15. The Future of the Campus: Architecture and Master Planning Trends

    ERIC Educational Resources Information Center

    Coulson, Jonathan; Roberts, Paul; Taylor, Isabelle

    2015-01-01

    The article discusses current and likely future trends within the architecture and master planning of university campuses. It argues that higher education administrators must maximise the value of the campus to create physical environments that enhance the student experience.

  16. Integrating the transportation system with a university transportation master plan.

    DOT National Transportation Integrated Search

    2010-02-01

    Introduction and Research Objectives : -TxDOT commissioned TTI and the University of Texas at El Paso (UTEP) to perform a : research study of the integration of the transportation system with the UTEP : transportation master plan : -The objective is ...

  17. 18 CFR 708.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Snelling, Twin Cities, Minnesota. (c) Master Plan means the Upper Mississippi River System Comprehensive... Section 708.1 Conservation of Power and Water Resources WATER RESOURCES COUNCIL UPPER MISSISSIPPI RIVER BASIN COMMISSION: PUBLIC PARTICIPATION IN UPPER MISSISSIPPI RIVER SYSTEM MASTER PLAN § 708.1 Definitions...

  18. SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

    NASA Technical Reports Server (NTRS)

    Thalman, Nancy E.; Sparn, Thomas P.

    1990-01-01

    SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

  19. An Expert System for Aviation Squadron Flight Scheduling

    DTIC Science & Technology

    1991-09-01

    SCHEDULING A. OVERVIEW A flight schedule is an organization’s plan to accomplish specific missions with its available resources. It details the mission...schedule for every 24 hour period, and will occasionally write a weekly flight schedule for long range planning purposes. The flight schedule is approved...requirements, and 11 aircraft, trainer, and aircrew availability to formulate the flight schedule. It basically is a plan to optimize the squadron’s resources

  20. Flexible Scheduling to Fit the Firefighters.

    ERIC Educational Resources Information Center

    Cox, Clarice Robinson

    Three flexible scheduling plans were tried in order that firefighters could take regular college courses despite their 24 hours on the 24 off work schedule. Plan one scheduled the firefighters into a regular Monday-Wednesday-Friday class which they attended every other week, making up missed material outside of class. Plan two scheduled special…

  1. FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. First floor plan, door transom schedule, interior finish schedule, sash schedule, exterior color schedule, and location plot plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. Al of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/25/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA

  2. 46 CFR 196.80-1 - Master's responsibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Master's responsibility. 196.80-1 Section 196.80-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Explosive Handling Plan § 196.80-1 Master's responsibility. (a) It shall be the responsibility of the master...

  3. 45 CFR 2400.62 - Evidence of master's degree.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Evidence of master's degree. 2400.62 Section 2400... FELLOWSHIP FOUNDATION FELLOWSHIP PROGRAM REQUIREMENTS Special Conditions § 2400.62 Evidence of master's... indicates that he or she has secured an approved master's degree as set forth in the Fellow's original Plan...

  4. 46 CFR 196.80-1 - Master's responsibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Master's responsibility. 196.80-1 Section 196.80-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Explosive Handling Plan § 196.80-1 Master's responsibility. (a) It shall be the responsibility of the master...

  5. 46 CFR 196.80-1 - Master's responsibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Master's responsibility. 196.80-1 Section 196.80-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Explosive Handling Plan § 196.80-1 Master's responsibility. (a) It shall be the responsibility of the master...

  6. 46 CFR 196.80-1 - Master's responsibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Master's responsibility. 196.80-1 Section 196.80-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Explosive Handling Plan § 196.80-1 Master's responsibility. (a) It shall be the responsibility of the master...

  7. 45 CFR 2400.62 - Evidence of master's degree.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Evidence of master's degree. 2400.62 Section 2400... FELLOWSHIP FOUNDATION FELLOWSHIP PROGRAM REQUIREMENTS Special Conditions § 2400.62 Evidence of master's... indicates that he or she has secured an approved master's degree as set forth in the Fellow's original Plan...

  8. 45 CFR 2400.62 - Evidence of master's degree.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Evidence of master's degree. 2400.62 Section 2400... FELLOWSHIP FOUNDATION FELLOWSHIP PROGRAM REQUIREMENTS Special Conditions § 2400.62 Evidence of master's... indicates that he or she has secured an approved master's degree as set forth in the Fellow's original Plan...

  9. 46 CFR 196.80-1 - Master's responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Master's responsibility. 196.80-1 Section 196.80-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Explosive Handling Plan § 196.80-1 Master's responsibility. (a) It shall be the responsibility of the master...

  10. Integrated Dynamic Process Planning and Scheduling in Flexible Manufacturing Systems via Autonomous Agents

    NASA Astrophysics Data System (ADS)

    Nejad, Hossein Tehrani Nik; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka

    Process planning and scheduling are important manufacturing planning activities which deal with resource utilization and time span of manufacturing operations. The process plans and the schedules generated in the planning phase shall be modified in the execution phase due to the disturbances in the manufacturing systems. This paper deals with a multi-agent architecture of an integrated and dynamic system for process planning and scheduling for multi jobs. A negotiation protocol is discussed, in this paper, to generate the process plans and the schedules of the manufacturing resources and the individual jobs, dynamically and incrementally, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans and schedules are searched and generated to cope with both the dynamic status and the disturbances of the manufacturing systems. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans and schedules in the dynamic manufacturing environment. A simulation software has been developed to carry out case studies, aimed at verifying the performance of the proposed multi-agent architecture.

  11. A Case Study in Master Planning the Learning Landscape Hub Concepts for the University at Buffalo

    ERIC Educational Resources Information Center

    Dugdale, Shirley; Torino, Roger; Felix, Elliot

    2009-01-01

    This case study describes concepts for three types of learning spaces that grew out of a Learning Landscape planning process. The process was part of a master plan study for the three campuses of the University at Buffalo. It involved research into user needs and aspirations about future pedagogy, development of learning space strategy,…

  12. Advanced On-the-Job Training System: Master Test Plan

    DTIC Science & Technology

    1990-05-01

    synonymous with program evaluation and consists of a plan to evaluate AOTS with regard to assessment of the four crit’cal issues of system compliance...acceptance, performance and suitability. Within the MTP, these critical issues are assessed at subcomponent, component, and subsystem levels. 14. SUBJECT...Master Test Plan is synonymous with program evaluation and consists of a plan to evaluate AOTS with regard to assessment of the four critical issues

  13. The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

    NASA Technical Reports Server (NTRS)

    Kidd, Luanne; Morris, Kenneth B.; Self, Timothy A.

    2007-01-01

    The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

  14. Automated Planning and Scheduling for Planetary Rover Distributed Operations

    NASA Technical Reports Server (NTRS)

    Backes, Paul G.; Rabideau, Gregg; Tso, Kam S.; Chien, Steve

    1999-01-01

    Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

  15. Doing Better with Less Energy: Energy Master Planning.

    ERIC Educational Resources Information Center

    Sieben, Stephen P.

    1982-01-01

    Energy savings through improved operation and maintenance of buildings and through implementation of energy conservation measures are discussed. Energy master planning--an approach to major retrofit and occupancy for existing college buildings, and energy conscious design and occupancy for new buildings--is advocated. (MLW)

  16. The Long Haul

    ERIC Educational Resources Information Center

    Erickson, Paul W.

    2009-01-01

    Most educational institutions have faced the decision whether to demolish, abandon or sell a facility. This article discusses how institutions can decide whether to renovate or build new. The author suggests to develop a campus- or districtwide master plan. A long-range master plan includes assessments of deferred maintenance, educational…

  17. Unmanned Aerial Vehicles Master Plan, 1994. Master Plan.

    DTIC Science & Technology

    1994-05-31

    Terminal SINCGARS = Single-Channel Ground and Airborne Radio System Figure 3-5 Maneuver Variant CONOPS I Psychological operations. deployment with early...650 KM DAT M 3 K (300 DESIRED) BEYOND FORWARD LINE OF OWN TROOPS (FLOT) APPROXIMATE RADIUS OF ACTION LEGEND ATARS = Advanced Tactical Air

  18. Feeding and metabolic consequences of scheduled consumption of large, binge-type meals of high fat diet in the Sprague-Dawley rat.

    PubMed

    Bake, T; Morgan, D G A; Mercer, J G

    2014-04-10

    Providing rats and mice with access to palatable high fat diets for a short period each day induces the consumption of substantial binge-like meals. Temporal food intake structure (assessed using the TSE PhenoMaster/LabMaster system) and metabolic outcomes (oral glucose tolerance tests [oGTTs], and dark phase glucose and insulin profiles) were examined in Sprague-Dawley rats given access to 60% high fat diet on one of 3 different feeding regimes: ad libitum access (HF), daily 2 h-scheduled access from 6 to 8 h into the dark phase (2 h-HF), and twice daily 1 h-scheduled access from both 1-2 h and 10-11 h into the dark phase (2×1 h-HF). Control diet remained available during the scheduled access period. HF rats had the highest caloric intake, body weight gain, body fat mass and plasma insulin. Both schedule-fed groups rapidly adapted their feeding behaviour to scheduled access, showing large meal/bingeing behaviour with 44% or 53% of daily calories consumed from high fat diet during the 2 h or 2×1 h scheduled feed(s), respectively. Both schedule-fed groups had an intermediate caloric intake and body fat mass compared to HF and control (CON) groups. Temporal analysis of food intake indicated that schedule-fed rats consumed large binge-type high fat meals without a habitual decrease in preceding intake on control diet, suggesting that a relative hypocaloric state was not responsible or required for driving the binge episode, and substantiating previous indications that binge eating may not be driven by hypothalamic energy balance neuropeptides. In an oGTT, both schedule-fed groups had impaired glucose tolerance with higher glucose and insulin area under the curve, similar to the response in ad libitum HF fed rats, suggesting that palatable feeding schedules represent a potential metabolic threat. Scheduled feeding on high fat diet produces similar metabolic phenotypes to mandatory (no choice) high fat feeding and may be a more realistic platform for mechanistic study of diet-induced obesity. Copyright © 2014 The Authors. Published by Elsevier Inc. All rights reserved.

  19. A Study of the Operating Room Scheduling System at Tripler Army Medical Center, Hawaii

    DTIC Science & Technology

    1981-08-01

    PROCESSING CLASS V SYSTEM .... .......... . A BIBLIOGRAPHY ....... ........... . . . .. . ii ’I. INTRODUCTIO9 Development of the Problem Convinced that...of the most difficult administrativo tasks that a modern hospital must face, and proposed using a combination of a master posting sheet and a...deal with scheduling problems.9 This particular process also incorporates the two-room system doscribed earlier, and the author admits that this

  20. Improving Intercontinental Ballistic Missile Maintenance Scheduling Through the Use of Location Analysis Methodologies

    DTIC Science & Technology

    2006-03-01

    Requirements for the Degree of Master of Science in Logistics Management Dale L. Overholts II, BS Capt, USAF March 2006 APPROVED...distance (e. g . , travel time or cost, demand satisfaction) is fundamental to such problems” (Current et al, 2002:86). The set covering location... the total number of scheduled launch facilities, can be found in Appendix F. Appendix G provides detailed information regarding the impacts of

  1. A criterion autoscheduler for long range planning

    NASA Technical Reports Server (NTRS)

    Sponsler, Jeffrey L.

    1994-01-01

    A constraint-based scheduling system called SPIKE is used to create long-term schedules for the Hubble Space Telescope. A meta-level scheduler called the Criterion Autoscheduler for Long range planning (CASL) was created to guide SPIKE's schedule generation according to the agenda of the planning scientists. It is proposed that sufficient flexibility exists in a schedule to allow high level planning heuristics to be applied without adversely affected crucial constraints such as spacecraft efficiency. This hypothesis is supported by test data which is described.

  2. Does California's Master Plan Still Work?

    ERIC Educational Resources Information Center

    Burdman, Pamela

    2009-01-01

    For nearly 50 years, California's higher education system has been shaped by the tripartite division of the vaunted Master Plan. The 1960 document's bold vision of access and quality safeguarded a system of selective research universities (the University of California) and provided baccalaureate education through less-selective campuses (the…

  3. Test and Evaluation Master Plan (TEMP) for the Ports and Waterways Safety System (PAWSS) Project

    DOT National Transportation Integrated Search

    1997-01-01

    This document outlines the Test Concept for the Ports and Waterways Safety System (PAWSS) Project. This Test and Evaluation Master Plan (TEMP) purpose is to reduce risk and ensure the PAWSS project meets all System Specification and Statement of Work...

  4. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Master table of single and double sampling plans. 43.104 Section 43.104 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE COMMODITY STANDARDS AND...

  5. 29 CFR 1952.101 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Oregon § 1952.101 Developmental schedule. The Oregon plan is developmental. The schedule of developmental steps as described in the plan is...

  6. 29 CFR 1952.101 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Oregon § 1952.101 Developmental schedule. The Oregon plan is developmental. The schedule of developmental steps as described in the plan is...

  7. Total Quality Management Office for Contracting Integrity Implementation Plan

    DTIC Science & Technology

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  8. A Master Plan for the Evaluation of the Radio Component of the Fifth Education Project for the Royal Government of Thailand.

    ERIC Educational Resources Information Center

    Bates, Tony

    The master plan for evaluation presented in this report was developed by a UNESCO consultant as part of an agreement between the Government of Thailand and the United Nations Development Program for a project providing technical assistance for strengthening educational radio for schools and out-of-school education. Although this plan is restricted…

  9. The Master Plan for Florida Postsecondary Education. Supplement Number 3: Disabled Student Access to Postsecondary Education. Report and Recommendations of the Postsecondary Education Planning Commission.

    ERIC Educational Resources Information Center

    Florida State Postsecondary Education Commission, Tallahassee.

    This third supplement to the Florida master plan for postsecondary education considers resources and barriers to education for disabled students and offers 21 recommendations. To provide a foundation to discuss the needs of disabled students, characteristics of the following major functional impairments are described: hearing impairment, learning…

  10. Report of Accomplishments under the Airport Improvement Program.

    DTIC Science & Technology

    1982-09-30

    Acquire snow removal equipment; conduct City of Portland feasibility study. Portland International (PRIMARY) Presque Isle 01 $ 15,840 Airport Master Plan...update to terminal City of Presque Isle area plan). Northern Maine Regional (PRIMARY) Presque Isle 02 $ 118,869 Rehabilitate terminal access road...City of Presque Isle Northern Maine Regional (PRIMARY) Rockland 01 $ 40,252 Airport Master Plan (update). Knox County Knox County Regional (COMMERCIAL

  11. Master Plan: The Introduction of Computer Science and Computer Related Instructional Programs, 1982-1985. Office of Instruction Publication Report No. 82-07.

    ERIC Educational Resources Information Center

    Veley, Victor F.; And Others

    This report presents a master plan for the development of computer science and computer-related programs at Los Angeles Trade-Technical College for 1982 through 1985. Introductory material outlines the main elements of the plan: to analyze existing computer courses, to create new courses in Laser Technology, Genetic Engineering, and Robotics; and…

  12. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance declaration requirements for additionally planned production of Schedule 3 chemicals. (a) Declaration... additionally planned production of Schedule 3 chemicals. 714.3 Section 714.3 Commerce and Foreign Trade...

  13. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  14. ENGINEERING ASPECTS OF COLLEGE PLANT DESIGN.

    ERIC Educational Resources Information Center

    DALTON, LIAM F.; SEGNER, MARVIN

    THE ARTICLE FOCUSES ON MECHANICAL AND ELECTRICAL FACILITIES THAT SHOULD BE CONSIDERED WHEN DEVELOPING A LONG RANGE MASTER PLAN. DEVELOPMENT OF THE MASTER PLAN SHOULD CONSIDER THE FOLLOWING--(1) COMPARATIVE FUEL COSTS, (2) POWER DISTRIBUTION, (3) HEATING PLANT, (4) CENTRAL PLANT SITE, (5) COOLING PLANT, (6) WATER SUPPLY, (7) STORM DRAINAGE, (8)…

  15. Reconfiguring a Campus--Fast.

    ERIC Educational Resources Information Center

    Hignite, Karla

    2003-01-01

    Describes the first phase of a master plan to expand the University of Alaska-Anchorage by purchasing a shopping mall and reconfiguring campus services to take advantage of the additional space. The master plan calls for eventually moving administration to the periphery of the campus and migrating academic programs to the campus center. (SLD)

  16. Are Your Schools Ready for the 21st Century?

    ERIC Educational Resources Information Center

    Vasilakis, John N.

    1990-01-01

    Although changes in instructional technology and population growth are the usual reasons school districts approach master planning as a tool for identifying and managing these changes, environmental concerns (like asbestos abatement and radon identification) play a role. A dozen tips for developing a master plan are provided. (MLH)

  17. San Jose/Evergreen Community College District: Governing Board's Strategic Master Plan.

    ERIC Educational Resources Information Center

    San Jose/Evergreen Community Coll. District, San Jose, CA.

    This report presents San Jose/Evergreen Community College District Governing Board's Strategic Master Plan. This report summarizes the district's mission statement, goal statements, and board priorities. The San Jose/Evergreen Community College District is committed to providing open access and opportunity for success to its multi-ethnic…

  18. Any Direction Home for California's Master Plan?

    ERIC Educational Resources Information Center

    Zingg, Paul J.

    2010-01-01

    In this article, the author talks about California's Master Plan for Higher Education, which offered a vision of access, affordability, and quality that was bold, inspiring, and attainable. It was predicated on the understanding that an educational system with such characteristics is essential to the cultural, political, and economic health of a…

  19. Traffic Trials

    ERIC Educational Resources Information Center

    Harknett, Thomas

    2007-01-01

    The decision to develop a transportation master plan for a school or university is often is a gradual process determined by changes that might have seemed insignificant in the beginning, but have combined to create problems that no longer can be ignored. Many circumstances can bring to light the need for a transportation master plan. In some…

  20. An Educational Master Plan for Austin Community College.

    ERIC Educational Resources Information Center

    Colvert, C. C.

    This seven-part report suggests a master plan for Austin Community College (ACC) through 1988-89 based on projections of enrollments, finances, and facility requirements. Section I details enrollment projections based on the proportional relationship between Travis County high school graduates and ACC enrollees. In addition, this section reviews…

  1. The Future of Tennessee: Higher Education 1987-1993.

    ERIC Educational Resources Information Center

    Tennessee Higher Education Commission, Nashville.

    This master plan for higher education in Tennessee sketches a framework for the continued improvement of postsecondary institutions and emphasizes the critical links between higher education and other components of the state. A set of principles and achievement targets undergirding the master plan are outlined. Specific action is called for in…

  2. Decision Support in a Changing and Contentious World--Successfully Supporting the Development of a 50-year Comprehensive Coastal Master Plan in Louisiana

    NASA Astrophysics Data System (ADS)

    Groves, D.

    2014-12-01

    After the devastating 2005 hurricane season, Louisiana embarked on an ambitious and daunting effort to develop and implement a comprehensive Coastal Master Plan. The Master Plan sought to achieve two key goals simultaneously: reduce hurricane flood risk and halt the net conversion of its coastal landscape to open ocean. Numerous prior efforts to achieve these goals had been tried without significant success. In 2012, however, the Louisiana Coastal Protection and Restoration Authority (CPRA) produced a 50-year, $50 billion Master Plan. It had broad support from a diverse and often adversarial set of stakeholders, and it was unanimously passed by the Louisiana legislature. In contrast to other efforts, CPRA took an approach to planning called by the U.S. National Research Council as "deliberation with analysis". Specifically, CPRA used data, models, and decision support tools not to define an optimal or best strategy, but instead to support stakeholder dialogue and deliberations over alterative coastal management strategies. RAND researchers, with the support of CPRA and other collaborators, developed the planning tool at the center of this process. The CPRA planning tool synthesized large amounts of information about how the coast might evolve over time with and without different combinations of hundreds of different projects and programs. The tool helped CPRA propose alternative strategies that could achieve the State's goals while also highlighting to stakeholders the key tradeoffs among them. Importantly, this process helped bring diverse communities together to support a single vision and specific set of projects and programs to meet many of Louisiana's coastal water resources challenges. This presentation will describe the planning approach and decision support tools developed to support the Master Plan's participatory stakeholder process. The presentation will also highlight several important key takeaway messages that have broad applicability to other water resources planning efforts. Lastly, it will describe several on-going efforts in other parts of the U.S. that are employing this same approach.

  3. 29 CFR 1952.241 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... extended training plan of substantially permanent form will be developed and adopted by October 1, 1976. (e... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Alaska § 1952.241 Developmental schedule. The Alaska plan is developmental. The Schedule of developmental steps (described in the plan as...

  4. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  5. Constraint-based integration of planning and scheduling for space-based observatory management

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven F.

    1994-01-01

    Progress toward the development of effective, practical solutions to space-based observatory scheduling problems within the HSTS scheduling framework is reported. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) short-term observation scheduling problem. The work was motivated by the limitations of the current solution and, more generally, by the insufficiency of classical planning and scheduling approaches in this problem context. HSTS has subsequently been used to develop improved heuristic solution techniques in related scheduling domains and is currently being applied to develop a scheduling tool for the upcoming Submillimeter Wave Astronomy Satellite (SWAS) mission. The salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research are summarized. Then, some key problem decomposition techniques underlying the integrated planning and scheduling approach to the HST problem are described; research results indicate that these techniques provide leverage in solving space-based observatory scheduling problems. Finally, more recently developed constraint-posting scheduling procedures and the current SWAS application focus are summarized.

  6. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  7. VPipe: Virtual Pipelining for Scheduling of DAG Stream Query Plans

    NASA Astrophysics Data System (ADS)

    Wang, Song; Gupta, Chetan; Mehta, Abhay

    There are data streams all around us that can be harnessed for tremendous business and personal advantage. For an enterprise-level stream processing system such as CHAOS [1] (Continuous, Heterogeneous Analytic Over Streams), handling of complex query plans with resource constraints is challenging. While several scheduling strategies exist for stream processing, efficient scheduling of complex DAG query plans is still largely unsolved. In this paper, we propose a novel execution scheme for scheduling complex directed acyclic graph (DAG) query plans with meta-data enriched stream tuples. Our solution, called Virtual Pipelined Chain (or VPipe Chain for short), effectively extends the "Chain" pipelining scheduling approach to complex DAG query plans.

  8. Distributed Topology Organization and Transmission Scheduling in Wireless Ad Hoc Networks

    DTIC Science & Technology

    2004-01-01

    slot consists of two mini -slots that support that support full-duplex transfer–one for master-to-slave transmission and the other from slave-to-master...protocol storage requirement would only be 208 bits in this case. 111 Communication requirements Each half-duplex mini -slot can be used by either a data or...either a data or control packet, eq. (4.2) sets the minimum half-duplex mini -slot size in the system or equivalently, the maximum system period

  9. Program Scheduling Handbook.

    DTIC Science & Technology

    1980-03-01

    account the outcome of any other task. Each activity must be estimated as a stand-alone entity from the network (statistical indep ndence). The... stress the term program as miiore in dUsive than contract in the WBS and Master Schedule. In this chapter we will present one very usable approach to...questions, not raise them. Use different colored cards to represent the SPO, the contractior, procurement, and any other agency that play, a major role in the

  10. Conception of Self-Construction Production Scheduling System

    NASA Astrophysics Data System (ADS)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  11. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  12. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  13. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  14. 48 CFR 5152.208-9001 - Industrial preparedness planning.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Production Planning Schedules during active production of the item and for a period of (negotiated number... Government's dependence upon the Production Planning Schedules as a basis to take appropriate measures to... intention to convert Production Planning Schedule to contracts on a selective basis, as may be required to...

  15. Maintaining consistency between planning hierarchies: Techniques and applications

    NASA Technical Reports Server (NTRS)

    Zoch, David R.

    1987-01-01

    In many planning and scheduling environments, it is desirable to be able to view and manipulate plans at different levels of abstraction, allowing the users the option of viewing and manipulating either a very detailed representation of the plan or a high-level more abstract version of the plan. Generating a detailed plan from a more abstract plan requires domain-specific planning/scheduling knowledge; the reverse process of generating a high-level plan from a detailed plan Reverse Plan Maintenance, or RPM) requires having the system remember the actions it took based on its domain-specific knowledge and its reasons for taking those actions. This reverse plan maintenance process is described as implemented in a specific planning and scheduling tool, The Mission Operations Planning Assistant (MOPA), as well as the applications of RPM to other planning and scheduling problems; emphasizing the knowledge that is needed to maintain the correspondence between the different hierarchical planning levels.

  16. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  17. Louisiana's 2017 Master Plan for a Sustainable Coast

    NASA Astrophysics Data System (ADS)

    Haase, B.

    2017-12-01

    The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement

  18. Master Plan for Tennessee Schools, 1995: Preparing for the 21st Century.

    ERIC Educational Resources Information Center

    Tennessee State Board of Education, Nashville.

    The Tennessee State Legislature passed the Education Improvement Act (EIA) in 1992, which established the Basic Education Program (BEP) as the funding formula for providing adequate, equitable, and sustainable school funding. This document presents the 1995 Master Plan for Tennessee Schools, which focuses on the priority issues that must be…

  19. Leading the Way: Success. 2013-18 Master Plan

    ERIC Educational Resources Information Center

    West Virginia Higher Education Policy Commission, 2013

    2013-01-01

    This is the second paper in the West Virginia State Higher Education Policy Commission's series concerning the major areas of the Commission's new master plan and compact process. Each paper elaborates on a particular theme sharing additional best practices and insights. It is the intention of the Commission that these additional resources assist…

  20. Leading the Way: Impact. 2013-18 Master Plan

    ERIC Educational Resources Information Center

    West Virginia Higher Education Policy Commission, 2013

    2013-01-01

    This is the third and final paper in the Commission's series concerning the major areas of the Commission's new master plan and compact process. Each paper elaborates on a particular theme sharing additional best practices and insights. It is the intention of the Commission that these additional resources assist in fostering discourse among…

  1. Leading the Way: Access. 2013-18 Master Plan

    ERIC Educational Resources Information Center

    West Virginia Higher Education Policy Commission, 2013

    2013-01-01

    The 2013-18 West Virginia Higher Education Policy Commission master plan, "Leading the Way: Access. Success. Impact" was developed to provide a programmatic framework and goals to enable the state's system of public four-year institutions to meet the educational needs of West Virginians. A state economy in flux with declining revenues…

  2. 20 CFR 632.11 - Designation of Native American grantees.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... or the first business day of the designation year. Such notices of intent to apply shall be submitted... Master Plan agreement or the Master Plan agreement is due to expire during the year of designation, the... and tribes, bands or groups which are being added to, or deleted from, the previous fiscal year's...

  3. Leading the Way: Access. Success. Impact. 2013-18 Master Plan

    ERIC Educational Resources Information Center

    West Virginia Higher Education Policy Commission, 2013

    2013-01-01

    The West Virginia Higher Education Policy Commission (Commission) has statutory responsibility for developing a five-year statewide master plan for higher education that sets forth system goals, objectives, and strategies and is aligned with meeting the goals of the state. The Legislature has identified in state code eight areas of special…

  4. Progress Report on the State of Texas Master Plan for Educational Technology, 2000-2003.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    This progress report documents accomplishments and activities for September 2000 through August 2002 related to the State of Texas Master Plan for Educational Technology 2000-2003. The first section presents background, goals, and recommendations as adopted by the Education Technology Coordinating Council (ETCC) in December 1999. The second…

  5. California Master Plan for Special Education--An Update.

    ERIC Educational Resources Information Center

    Pillsbury, Charles A.; Maitland, Anne M.

    The report updates aspects of the 1977 report on California's Master Plan for Special Education. Reasons are sought for the intense debate over state funding for special education, which has substantially increased over recent years while special education enrollments have increased only modestly. In visits to nearly 100 local education agencies,…

  6. Master Plan for the City Colleges of Chicago.

    ERIC Educational Resources Information Center

    Westinghouse Learning Corp., Palo Alto, CA. Davis MacConnell Ralston Div.

    This Master Plan for the City Colleges of Chicago outlines their goals for the latter half of the 1970's. Thirty-two recommendations are made concerning six goal areas: community and people, programs, instruction, facilities, finance, and organization. Among the recommendations are the following: (1) by 1980 the city colleges should aim to serve…

  7. 45. Master plan of 4th floor, building 1, U.S. Naval ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Master plan of 4th floor, building 1, U.S. Naval supply activities, New York, Brooklyn, New York, public works department, March 2, 1953. Drawing #BK-S1-4. Scale 1/16=1. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY

  8. ORION mobile unit design

    NASA Technical Reports Server (NTRS)

    Brunn, D. L.; Wu, S. C.; Thom, E. H.; Mclaughlin, F. D.; Sweetser, B. M.

    1980-01-01

    An overview of the design of the ORION mobile system is presented. System capability and performance characteristics are outlined. Functional requirements and key performance parameters are stated for each of the nine subsystems. A master design and implementation schedule is given.

  9. Production Planning and Planting Pattern Scheduling Information System for Horticulture

    NASA Astrophysics Data System (ADS)

    Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu

    2018-02-01

    This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.

  10. Strategies for sustainable development of industrial park in Ulsan, South Korea--from spontaneous evolution to systematic expansion of industrial symbiosis.

    PubMed

    Park, Hung-Suck; Rene, Eldon R; Choi, Soo-Mi; Chiu, Anthony S F

    2008-04-01

    The Korea National Cleaner Production Center (KNCPC) affiliated to the Korea Institute of Industrial Technology (KITECH) has started a 15 year, 3-phase EIP master plan with the support of Ministry of Commerce, Industry, and Energy (MOCIE). A total of 6 industrial parks, including industrial parks in Ulsan city, known as the industrial capital of South Korea, are planning projects to find the feasibility of shifting existing industrial parks to eco-industrial parks. The basic survey shows that Ulsan industrial complex has been continuously evolving from conventional industrial complexes to eco-industrial parks by spontaneous industrial symbiosis. This paper describes the Korean national policies and the developmental activities of this vision to drive the global trend of innovation for converting the existing industrial parks to eco-industrial parks through inter-industry waste, energy, and material exchange in Ulsan Industrial complexes. In addition, the primary and supportive components of the Ulsan EIP pilot project, which will be implemented for 5 years is elaborated with its schedules and economic benefits.

  11. 77 FR 59039 - Proposed Collection; Comment Request for Revenue Procedure 2011-49

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... comments concerning Revenue Procedure 2011-49, Master and Prototype and Volume Submitter Plans. DATES... [email protected] . SUPPLEMENTARY INFORMATION: Title: Master and Prototype and Volume Submitter... and prototype and volume submitter revenue procedure sets forth the procedures for sponsors of master...

  12. CRI planning and scheduling for space

    NASA Technical Reports Server (NTRS)

    Aarup, Mads

    1994-01-01

    Computer Resources International (CRI) has many years of experience in developing space planning and scheduling systems for the European Space Agency. Activities range from AIT/AIV planning over mission planning to research in on-board autonomy using advanced planning and scheduling technologies in conjunction with model based diagnostics. This article presents four projects carried out for ESA by CRI with various subcontractors: (1) DI, Distributed Intelligence for Ground/Space Systems is an on-going research project; (2) GMPT, Generic Mission Planning Toolset, a feasibility study concluded in 1993; (3) OPTIMUM-AIV, Open Planning Tool for AIV, development of a knowledge based AIV planning and scheduling tool ended in 1992; and (4) PlanERS-1, development of an AI and knowledge-based mission planning prototype for the ERS-1 earth observation spacecraft ended in 1991.

  13. Temporal and Resource Reasoning for Planning, Scheduling and Execution in Autonomous Agents

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Hunsberger, Luke; Tsamardinos, Ioannis

    2005-01-01

    This viewgraph slide tutorial reviews methods for planning and scheduling events. The presentation reviews several methods and uses several examples of scheduling events for the successful and timely completion of the overall plan. Using constraint based models the presentation reviews planning with time, time representations in problem solving and resource reasoning.

  14. Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

    NASA Technical Reports Server (NTRS)

    Davis, Randal; Thalman, Nancy

    1993-01-01

    The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

  15. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...

  16. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...

  17. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...

  18. Connecting Systems Model Design to Decision-Maker and Stakeholder Needs: Lessons from Louisiana's Coastal Master Plan

    NASA Astrophysics Data System (ADS)

    Fischbach, J. R.; Johnson, D.

    2017-12-01

    Louisiana's Comprehensive Master Plan for a Sustainable Coast is a 50-year plan designed to reduce flood risk and minimize land loss while allowing for the continued provision of economic and ecosystem services from this critical coastal region. Conceived in 2007 in response to hurricanes Katrina and Rita in 2005, the master plan is updated on a five-year planning cycle by the state's Coastal Protection and Restoration Authority (CPRA). Under the plan's middle-of-the-road (Medium) environmental scenario, the master plan is projected to reduce expected annual damage from storm surge flooding by approximately 65% relative to a future without action: from 5.3 billion to 2.2 billion in 2040, and from 12.1 billion to 3.7 billion in 2065. The Coastal Louisiana Risk Assessment model (CLARA) is used to estimate the risk reduction impacts of projects that have been considered for implementation as part of the plan. Evaluation of projects involves estimation of cost effectiveness in multiple future time periods and under a range of environmental uncertainties (e.g., the rates of sea level rise and land subsidence, changes in future hurricane intensity and frequency), operational uncertainties (e.g., system fragility), and economic uncertainties (e.g., patterns of population change and asset exposure). Between the 2012 and 2017 planning cycles, many improvements were made to the CLARA model. These included changes to the model's spatial resolution and definition of policy-relevant spatial units, an improved treatment of parametric uncertainty and uncertainty propagation between model components, the addition of a module to consider critical infrastructure exposure, and a new population growth model. CPRA also developed new scenarios for analysis in 2017 that were responsive to new scientific literature and to accommodate a new approach to modeling coastal morphology. In this talk, we discuss how CLARA has evolved over the 2012 and 2017 planning cycles in response to the needs of policy makers and CPRA managers. While changes will be illustrated through examples from Louisiana's 2017 Coastal Master Plan, we endeavor to provide generalizable and actionable insights about how modeling choices should be guided by the decision support process being used by planners.

  19. Using Earned Value Data to Forecast the Duration of Department of Defense (DoD) Space Acquisition Programs

    DTIC Science & Technology

    2015-03-26

    acquisition programs’ cost and schedule. Many prior studies have focused on the overall cost of programs (the cost estimate at completion (EAC)) ( Smoker ...regression ( Smoker , 2011), the Kalman Filter Forecasting Method (Kim, 2007), and analysis of the Integrated Master Schedule (IMS). All of the...A study by Smoker demonstrated this technique by first regressing the BCWP against months and the same approach for BAC (2011). In that study

  20. Exploratory Model Analysis of the Space Based Infrared System (SBIRS) Low Global Scheduler Problem

    DTIC Science & Technology

    1999-12-01

    solution. The non- linear least squares model is defined as Y = f{e,t) where: 0 =M-element parameter vector Y =N-element vector of all data t...NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS EXPLORATORY MODEL ANALYSIS OF THE SPACE BASED INFRARED SYSTEM (SBIRS) LOW GLOBAL SCHEDULER...December 1999 3. REPORT TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE EXPLORATORY MODEL ANALYSIS OF THE SPACE BASED INFRARED SYSTEM

  1. Decomposability and scalability in space-based observatory scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.

    1992-01-01

    In this paper, we discuss issues of problem and model decomposition within the HSTS scheduling framework. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) scheduling problem, motivated by the limitations of the current solution and, more generally, the insufficiency of classical planning and scheduling approaches in this problem context. We first summarize the salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research. Then, we describe some key problem decomposition techniques supported by HSTS and underlying our integrated planning and scheduling approach, and we discuss the leverage they provide in solving space-based observatory scheduling problems.

  2. Artificial intelligence techniques for scheduling Space Shuttle missions

    NASA Technical Reports Server (NTRS)

    Henke, Andrea L.; Stottler, Richard H.

    1994-01-01

    Planning and scheduling of NASA Space Shuttle missions is a complex, labor-intensive process requiring the expertise of experienced mission planners. We have developed a planning and scheduling system using combinations of artificial intelligence knowledge representations and planning techniques to capture mission planning knowledge and automate the multi-mission planning process. Our integrated object oriented and rule-based approach reduces planning time by orders of magnitude and provides planners with the flexibility to easily modify planning knowledge and constraints without requiring programming expertise.

  3. Second Annual Review of the Master Plan for Postsecondary Education in Louisiana: 2011

    ERIC Educational Resources Information Center

    Louisiana Board of Regents, 2013

    2013-01-01

    In 2011, the Board of Regents (BoR), through the development and implementation of the Master Plan, advanced its vision for the future of postsecondary education by adopting the following three broad goals: (1) Increase the educational attainment of the State's adult population to the Southern Regional Education Board (SREB) States' average by…

  4. Master Plan for Tennessee Schools: Preparing for the 21st Century.

    ERIC Educational Resources Information Center

    Tennessee State Board of Education, Nashville.

    The Education Improvement Act (EIA) was passed in Tennessee in 1992. It established the Basic Education Program (BEP) as the funding formula used to provide adequate, equitable, and sustainable school funding. The 1997 master plan is consistent with the national Goals 2000 legislation and addresses each of the eight national goals. The plan…

  5. California's "Gold Standard" for Higher Education Falls Upon Hard Times

    ERIC Educational Resources Information Center

    Keller, Josh

    2009-01-01

    Few documents in higher education have enjoyed the influence or longevity of the California Master Plan for Higher Education, the 1960 law that transformed the state's public colleges and served as a blueprint for public systems across the country. Even today, almost 50 years after it was written, the master plan retains a mythic status in…

  6. 75 FR 53735 - Notice of Final Federal Agency Actions on East Lake Sammamish Master Plan Trail in King County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... on East Lake Sammamish Master Plan Trail in King County, WA AGENCY: Federal Highway Administration... enhancement project, the East Lake Sammamish Trail, starting at Gilman Boulevard in Issaquah, Washington and ending at Bear Creek Trail in Redmond, Washington. Those actions grant licenses, permits, and approvals...

  7. Long-Range Master Plan, 1986-1989. Black Hawk College, East Campus.

    ERIC Educational Resources Information Center

    Black Hawk Coll. Kewanee, IL. East Campus.

    This 3-year strategic long-range master plan states the intended direction of Black Hawk College-East Campus (BHC) in Illinois for October 1986 to October 1989. The report begins with a series of graphs offering various service area comparisons between rural Illinois residents and BHE students; enrollment data; and student demographics. Next, the…

  8. Third Annual Review of the Master Plan for Postsecondary Education in Louisiana: 2011

    ERIC Educational Resources Information Center

    Louisiana Board of Regents, 2014

    2014-01-01

    In 2011, the Board of Regents (BoR), through the development and implementation of the Master Plan, advanced its vision for the future of postsecondary education by adopting the following three broad goals: (1) Increase the educational attainment of the State's adult population to the Southern Regional Education Board (SREB) States' average by…

  9. A Master Plan for the Development of Vocational-Technical Education In New Mexico.

    ERIC Educational Resources Information Center

    Sterling Inst., Washington, DC.

    This master plan for vocational education in New Mexico is the result of a study conducted by professional education consultants. The following areas were examined during the study: (1) New Mexico's present manpower problems, (2) market trends of future industrial potential, (3) state resources capable of attracting new industry, (4) adequacy of…

  10. Master Plan for Educational Facilities: Midland Park, Bergen County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Midland Park, New Jersey, is a small borough with an estimated population in 1978 of 8,500 persons. The first part of the master plan for educational facilities in the area begins with an overview using maps to illustrate characteristics including its topography, relationship to key population centers and major transportation routes, boundaries,…

  11. Access and Equity: California Master Plan for Higher Education and Disadvantaged Student Success

    ERIC Educational Resources Information Center

    Davis, Kevin P.

    2015-01-01

    The California Master Plan for Higher Education sets a policy objective of equity through access to higher education. The California State University system is California's primary institution for providing the social mobility that accompanies a four-year college degree. The purpose of this study is to examine the education lifecycle outcomes for…

  12. Implementation plan for HANDI 2000 TWRS master equipment list

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  13. The Future of Public Undergraduate Education in California.

    ERIC Educational Resources Information Center

    Shires, Michael A.

    This report investigates whether the state of California can return to the levels of access to higher education envisioned in its Master Plan adopted in 1960. Chapter 1 is an introduction which discusses the state's commitment to access, the structure of the educational sector under the Master plan, the effects of the recession of the early 1990s…

  14. 106. Air defense command "master plan", base map," RCA Service ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    106. Air defense command "master plan", base map," RCA Service Company tab no. F-1, sheet 1 of 2, dated 22 October, 1965. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  15. The Structure of the University Network: From the Soviet to Russian "Master Plan"

    ERIC Educational Resources Information Center

    Kuzminov, Ia. I.; Semenov, D. S.; Froumin, I. D.

    2015-01-01

    The authors discuss the underpinnings of structural analysis in the higher education system. The article justifies why it focuses on specific labor market segments and the nature of the university's basic product as grounds for proposing a typology and groups of institutions. A Soviet "master plan" is reconstructed on the basis of the…

  16. Master Plan for Educational Facilities: Garwood, Union County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Garwood, New Jersey, is a small borough of 0.69 square miles with an estimated population in 1978 of 4,856 persons. This master plan for educational facilities begins with an overview of the district that describes its beginnings as an industrial community. A number of maps illustrate characteristics of the area including its topography,…

  17. Fourth Annual Review of the Master Plan for Postsecondary Education in Louisiana: 2011

    ERIC Educational Resources Information Center

    Louisiana Board of Regents, 2015

    2015-01-01

    In 2011, the Louisiana Board of Regents (BoR), through the development and implementation of the Master Plan, advanced its vision for the future of postsecondary education by adopting the following three broad goals: (1) Increase the educational attainment of the State's adult population to the Southern Regional Education Board (SREB) States'…

  18. Planning and Scheduling of Software Manufacturing Projects

    DTIC Science & Technology

    1991-03-01

    based on the previous results in social analysis of computing, operations research in manufacturing, artificial intelligence in manufacturing...planning and scheduling, and the traditional approaches to planning in artificial intelligence, and extends the techniques that have been developed by them...social analysis of computing, operations research in manufacturing, artificial intelligence in manufacturing planning and scheduling, and the

  19. Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

    NASA Technical Reports Server (NTRS)

    Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte

    1992-01-01

    The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

  20. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.371 Developmental schedule. The Virginia plan is developmental. Following is a schedule of major developmental steps: (a) Standards identical to the Federal standards will be completely adopted by January 1, 1978. (b) A plan for...

  1. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.371 Developmental schedule. The Virginia plan is developmental. Following is a schedule of major developmental steps: (a) Standards identical to the Federal standards will be completely adopted by January 1, 1978. (b) A plan for...

  2. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.371 Developmental schedule. The Virginia plan is developmental. Following is a schedule of major developmental steps: (a) Standards identical to the Federal standards will be completely adopted by January 1, 1978. (b) A plan for...

  3. 29 CFR 1952.371 - Developmental schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.371 Developmental schedule. The Virginia plan is developmental. Following is a schedule of major developmental steps: (a) Standards identical to the Federal standards will be completely adopted by January 1, 1978. (b) A plan for...

  4. A survey of planning and scheduling research at the NASA Ames Research Center

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1989-01-01

    NASA Ames Research Center has a diverse program in planning and scheduling. Some research projects as well as some applications are highlighted. Topics addressed include machine learning techniques, action representations and constraint-based scheduling systems. The applications discussed are planetary rovers, Hubble Space Telescope scheduling, and Pioneer Venus orbit scheduling.

  5. 45 CFR 2400.42 - Approval of Plan of Study.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-time basis lead to a master's degree in history or political science, the degree of Master of Arts in Teaching in history or political science, or a related master's degree in education that permits a concentration in American history, American government, social studies, or political science; (b) Include...

  6. Software for Planning Scientific Activities on Mars

    NASA Technical Reports Server (NTRS)

    Ai-Chang, Mitchell; Bresina, John; Jonsson, Ari; Hsu, Jennifer; Kanefsky, Bob; Morris, Paul; Rajan, Kanna; Yglesias, Jeffrey; Charest, Len; Maldague, Pierre

    2003-01-01

    Mixed-Initiative Activity Plan Generator (MAPGEN) is a ground-based computer program for planning and scheduling the scientific activities of instrumented exploratory robotic vehicles, within the limitations of available resources onboard the vehicle. MAPGEN is a combination of two prior software systems: (1) an activity-planning program, APGEN, developed at NASA s Jet Propulsion Laboratory and (2) the Europa planner/scheduler from NASA Ames Research Center. MAPGEN performs all of the following functions: Automatic generation of plans and schedules for scientific and engineering activities; Testing of hypotheses (or what-if analyses of various scenarios); Editing of plans; Computation and analysis of resources; and Enforcement and maintenance of constraints, including resolution of temporal and resource conflicts among planned activities. MAPGEN can be used in either of two modes: one in which the planner/scheduler is turned off and only the basic APGEN functionality is utilized, or one in which both component programs are used to obtain the full planning, scheduling, and constraint-maintenance functionality.

  7. EUROPA2: Plan Database Services for Planning and Scheduling Applications

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Frank, Jeremy; Jonsson, Ari; McGann, Conor

    2004-01-01

    NASA missions require solving a wide variety of planning and scheduling problems with temporal constraints; simple resources such as robotic arms, communications antennae and cameras; complex replenishable resources such as memory, power and fuel; and complex constraints on geometry, heat and lighting angles. Planners and schedulers that solve these problems are used in ground tools as well as onboard systems. The diversity of planning problems and applications of planners and schedulers precludes a one-size fits all solution. However, many of the underlying technologies are common across planning domains and applications. We describe CAPR, a formalism for planning that is general enough to cover a wide variety of planning and scheduling domains of interest to NASA. We then describe EUROPA(sub 2), a software framework implementing CAPR. EUROPA(sub 2) provides efficient, customizable Plan Database Services that enable the integration of CAPR into a wide variety of applications. We describe the design of EUROPA(sub 2) from the perspective of both modeling, customization and application integration to different classes of NASA missions.

  8. Self-scheduling with Microsoft Excel.

    PubMed

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  9. Master Plan Jakarta, Indonesia: The Giant Seawall and the need for structural treatment of municipal waste water.

    PubMed

    van der Wulp, Simon A; Dsikowitzky, Larissa; Hesse, Karl Jürgen; Schwarzbauer, Jan

    2016-09-30

    In order to take actions against the annual flooding in Jakarta, the construction of a Giant Seawall has been proposed in the Master Plan for National Capital Integrated Coastal Development. The seawall provides a combination of technical solutions against flooding, but these will heavily modify the mass transports in the near-coastal area of Jakarta Bay. This study presents numerical simulations of river flux of total nitrogen and N,N-diethyl-m-toluamide, a molecular tracer for municipal waste water for similar scenarios as described in the Master Plan. Model results demonstrate a strong accumulation of municipal wastes and nutrients in the planned reservoirs to extremely high levels which will result in drastic adverse eutrophication effects if the treatment of municipal waste water is not dealt with in the same priority as the construction of the Giant Seawall. Copyright © 2016 Elsevier Ltd. All rights reserved.

  10. PLAN-IT-2: The next generation planning and scheduling tool

    NASA Technical Reports Server (NTRS)

    Eggemeyer, William C.; Cruz, Jennifer W.

    1990-01-01

    PLAN-IT is a scheduling program which has been demonstrated and evaluated in a variety of scheduling domains. The capability enhancements being made for the next generation of PLAN-IT, called PLAN-IT-2 is discussed. PLAN-IT-2 represents a complete rewrite of the original PLAN-IT incorporating major changes as suggested by the application experiences with the original PLAN-IT. A few of the enhancements described are additional types of constraints, such as states and resettable-depletables (batteries), dependencies between constraints, multiple levels of activity planning during the scheduling process, pattern constraint searching for opportunities as opposed to just minimizing the amount of conflicts, additional customization construction features for display and handling of diverse multiple time systems, and reduction in both the size and the complexity for creating the knowledge-base to address the different problem domains.

  11. Scheduling "Go with the Flow."

    ERIC Educational Resources Information Center

    Yucht, Alice

    1999-01-01

    Presents guidelines for creating a Master Planner for the school year. Highlights several factors to consider, including annual classroom projects; standardized testing dates; report card dates; special assembly programs and local/national/world events; book fairs; and end of the year activities. (AEF)

  12. Automotive Manufacturing Assessment System : Volume 1. Master Product Schedules.

    DOT National Transportation Integrated Search

    1999-11-01

    Volume I is part of a four volume set documenting areas of research resulting from the development of the Automotive Manufacturing Assessment System (AMAS) for the DOT/Transportation Systems Center. AMAS was designed to assist in the evaluation of in...

  13. Planning and Scheduling for Environmental Sensor Networks

    NASA Astrophysics Data System (ADS)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory resources and to reduce the costs of communication. Planning and scheduling is generally a heavy consumer of time, memory and energy resources. This means careful thought must be given to how much planning and scheduling should be done on the sensors themselves, and how much to do elsewhere. The difficulty of planning and scheduling is exacerbated when reasoning about uncertainty. More time, memory and energy is needed to solve such problems, leading either to more expensive sensors, or suboptimal plans. For example, scientifically interesting events may happen at random times, making it difficult to ensure that sufficient resources are availanble. Since uncertainty is usually lowest in proximity to the sensors themselves, this argues for planning and scheduling onboard the sensors. However, cost minimization dictates sensors be kept as simple as possible, reducing the amount of planning and scheduling they can do themselves. Furthermore, coordinating each sensor's independent plans can be difficult. In the full presentation, we will critically review the planning and scheduling systems used by previously fielded sensor networks. We do so primarily from the perspective of the computational sciences, with a focus on taming computational complexity when operating sensor networks. The case studies are derived from sensor networks based on UAVs, satellites, and planetary rovers. Planning and scheduling considerations include multi-sensor coordination, optimizing science value, onboard power management, onboard memory, planning movement actions to acquire data, and managing communications.These case studies offer lessons for future designs of environmental sensor networks.

  14. Autonomous mission planning and scheduling: Innovative, integrated, responsive

    NASA Technical Reports Server (NTRS)

    Sary, Charisse; Liu, Simon; Hull, Larry; Davis, Randy

    1994-01-01

    Autonomous mission scheduling, a new concept for NASA ground data systems, is a decentralized and distributed approach to scientific spacecraft planning, scheduling, and command management. Systems and services are provided that enable investigators to operate their own instruments. In autonomous mission scheduling, separate nodes exist for each instrument and one or more operations nodes exist for the spacecraft. Each node is responsible for its own operations which include planning, scheduling, and commanding; and for resolving conflicts with other nodes. One or more database servers accessible to all nodes enable each to share mission and science planning, scheduling, and commanding information. The architecture for autonomous mission scheduling is based upon a realistic mix of state-of-the-art and emerging technology and services, e.g., high performance individual workstations, high speed communications, client-server computing, and relational databases. The concept is particularly suited to the smaller, less complex missions of the future.

  15. An assessment of PERT as a technique for schedule planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1982-01-01

    The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.

  16. Implementation of the Master Plan for Statewide Professional Staff Development for 2012-2013: An Evaluation Study

    ERIC Educational Resources Information Center

    Hammer, Patricia Cahape

    2014-01-01

    In this evaluation, as in previous years, four main aspects of the implementation of the West Virginia Board of Education's Master Plan for Statewide Professional Development were examined: (a) basic information reported by providers about the size and scope of the effort, including attendance, and adherence to the newly adopted standards for…

  17. Academic Master Planning in the California State University and Colleges 1972-73 through 1976-77.

    ERIC Educational Resources Information Center

    California State Colleges, Los Angeles. Div. of Academic Planning.

    The California State University and Colleges have devised a system of academic Master Planning that allows them to design curricular models for the future while at the same time evaluating their present curricular offerings. It provides for a continual curricular evaluation cycle for each campus within the system. The materials contained in this…

  18. Three-Year College Discovery Master Plan, Bronx Community College, 1998-2001, Parts I-III.

    ERIC Educational Resources Information Center

    Smith, Shirley; Santa Rita, Emilio

    Bronx Community College created a three-year College Discovery (CD) master plan for 1998-2001 to help restructure its counseling programs and support services and enable CD students to acquire an associate's degree level of education. The first area of restructuring is in the role of the director of College Discovery and Counseling. General…

  19. Postsecondary Attainment in the Decade of Decision: The Master Plan for Tennessee Postsecondary Education 2015-2025

    ERIC Educational Resources Information Center

    Tennessee Higher Education Commission, 2015

    2015-01-01

    The Tennessee Higher Education Commission (THEC) was charged by state statute with developing a statewide Master Plan for the future development of public universities, community colleges, and colleges of applied technology, with input from the Board of Regents and the University of Tennessee Board of Trustees. The overriding function of the Plan…

  20. Challenges, Realities, Strategies: The Master Plan for Florida Postsecondary Education for the 21st Century.

    ERIC Educational Resources Information Center

    Florida State Postsecondary Education Planning Commission, Tallahassee.

    A new master plan for higher education in Florida is presented which focuses on the central challenges facing the state and its higher education institutions. The following sections address three key challenges and suggest strategies to help policymakers and governing boards promote positive change. The section on the challenge of improved use of…

  1. Master Plan for Educational Facilities: City of Clifton, Passaic County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Clifton, New Jersey, has a land area of just under 12 square miles with a population estimated in 1976 to be 83,592 persons. This master plan for educational facilities begins with an overview of the district and its historical background. A number of maps illustrate characteristics of the area, including its topography, relationship to key…

  2. And the Sky Is Grey: The Ambivalent Outcomes of the California Master Plan for Higher Education

    ERIC Educational Resources Information Center

    Marginson, Simon

    2018-01-01

    In the 1960 Master Plan for Higher Education, California in the United States famously combined the principles of excellence and access within a steep three-tiered system of Higher Education. It fashioned the world's strongest system of public research universities, while creating an open access system that brought college to millions of American…

  3. Knowledge-based systems for power management

    NASA Technical Reports Server (NTRS)

    Lollar, L. F.

    1992-01-01

    NASA-Marshall's Electrical Power Branch has undertaken the development of expert systems in support of further advancements in electrical power system automation. Attention is given to the features (1) of the Fault Recovery and Management Expert System, (2) a resource scheduler or Master of Automated Expert Scheduling Through Resource Orchestration, and (3) an adaptive load-priority manager, or Load Priority List Management System. The characteristics of an advisory battery manager for the Hubble Space Telescope, designated the 'nickel-hydrogen expert system', are also noted.

  4. Cost and Schedule Control Management: What the Department of Defense Major Acquisition System Program Manager Needs to Know

    DTIC Science & Technology

    1992-03-01

    public release; distribution is unlimited. 2b. DECLASSIFICATION/DOWNGRADING SCHEDULE 4. PERFORMING ORGANIZATION REPORT NUMBER( S ) S . MONITORING...ORGANIZATION REPORT NUMBER( S ) Sa. NAME OF PERFORMING ORGANIZATION 6b. OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION Naval Postgraduate School (If appikable...PERSONAL AUTHOR( S ) Coutteau, Charles G. 13a. TYPE OF REPORT 1 3b. TIME COVE RED 14. DATE OF REPORT (year, month, day) 1S. PAGE COUNT Master’s TheisI From

  5. Bridging the Gap Between Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Smith, David E.; Frank, Jeremy; Jonsson, Ari K.; Norvig, Peter (Technical Monitor)

    2000-01-01

    Planning research in Artificial Intelligence (AI) has often focused on problems where there are cascading levels of action choice and complex interactions between actions. In contrast. Scheduling research has focused on much larger problems where there is little action choice, but the resulting ordering problem is hard. In this paper, we give an overview of M planning and scheduling techniques, focusing on their similarities, differences, and limitations. We also argue that many difficult practical problems lie somewhere between planning and scheduling, and that neither area has the right set of tools for solving these vexing problems.

  6. Marketing Plan for the Naval Postgraduate School Master of Business Administration to the Navy Unrestricted Line Community

    DTIC Science & Technology

    2004-06-01

    represented in the Defense-Focused MBA program at the School of Business and Public Policy ( BPP ), Naval Postgraduate School (NPS). The authors believe...initial goal of this Master of Business Administration (MBA) Application Project was to assist the Graduate School of Business and Public Policy ( BPP ) in...that the BPP has a strategic plan with clear and concise goals including marketing goals, but has no marketing plan for the resident MBA program

  7. 40 CFR 52.1425 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1425 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nebraska § 52.1425 Compliance schedules. (a) The compliance schedules for the sources identified below are approved as revisions to the plan...

  8. Coeur d'Alene Tribal Production Facility, Volume I of III, 2002-2003 Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anders, Paul

    2003-01-01

    In fulfillment of the NWPPC's 3-Step Process for the implementation of new hatcheries in the Columbia Basin, this Step 1 submission package to the Council includes four items: (1) Cover letter from the Coeur d'Alene Tribe, Interdisciplinary Team Chair, and the USFWS; (2) References to key information (Attachments 1-4); (3) The updated Master Plan for the Tribe's native cutthroat restoration project; and (4) Appendices. In support of the Master Plan submitted by the Coeur d'Alene Tribe the reference chart (Item 2) was developed to allow reviewers to quickly access information necessary for accurate peer review. The Northwest Power Planning Councilmore » identified pertinent issues to be addressed in the master planning process for new artificial production facilities. References to this key information are provided in three attachments: (1) NWPPC Program language regarding the Master Planning Process, (2) Questions Identified in the September 1997 Council Policy, and (3) Program language identified by the Council's Independent Scientific Review Panel (ISRP). To meet the need for off-site mitigation for fish losses on the mainstem Columbia River, in a manner consistent with the objectives of the Council's Program, the Coeur d'Alene Tribe is proposing that the BPA fund the design, construction, operation, and maintenance of a trout production facility located adjacent to Coeur d'Alene Lake on the Coeur d'Alene Indian Reservation. The updated Master Plan (Item 3) represents the needs associated with the re-evaluation of the Coeur d'Alene Tribe's Trout Production Facility (No.199004402). This plan addresses issues and concerns expressed by the NWPPC as part of the issue summary for the Mountain Columbia provincial review, and the 3-step hatchery review process. Finally, item 4 (Appendices) documents the 3-Step process correspondence to date between the Coeur d'Alene Tribe and additional relevant entities. Item 4 provides a chronological account of previous ISRP reviews, official Coeur d'Alene fisheries program responses to a series of ISRP reviews, master planning documentation, and annual reports dating back to 1990. Collectively, the materials provided by the Coeur d'Alene Tribe in this Step-1 submission package comprehensively assesses key research, habitat improvement activities, and hatchery production issues to best protect and enhance native cutthroat trout populations and the historically and culturally important tribal fisheries they support.« less

  9. Project Scheduling Based on Risk of Gas Transmission Pipe

    NASA Astrophysics Data System (ADS)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  10. 40 CFR 52.1335 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1335 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Missouri § 52.1335 Compliance schedules. (a) The compliance schedule for the source identified below is approved as a revision to the plan pursuant...

  11. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  12. A survey of planning and scheduling research at the NASA Ames Research Center

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1988-01-01

    NASA Ames Research Center has a diverse program in planning and scheduling. This paper highlights some of our research projects as well as some of our applications. Topics addressed include machine learning techniques, action representations and constraint-based scheduling systems. The applications discussed are planetary rovers, Hubble Space Telescope scheduling, and Pioneer Venus orbit scheduling.

  13. The Consolidated Planning and Scheduling System for Space Transportation and Space Station operations - Successful development experience

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Willoughby, John K.; Gardner, Jo A.; Shinkle, Gerald L.

    1993-01-01

    In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.

  14. Computer-aided resource planning and scheduling for radiological services

    NASA Astrophysics Data System (ADS)

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  15. Preserving the Master Plan: What Is To Be Done in a New Epoch of More Limited Growth of Resources? Report 94-3.

    ERIC Educational Resources Information Center

    Kerr, Clark

    Under the Master Plan of 1960, California was the first state to provide universal access to higher education for all high school graduates. Despite great success at all levels, higher education in California is now facing a crisis. National and state-wide recessions have reduced resources while potential enrollment is sharply increasing from…

  16. Syracuse urban forest master plan: guiding the city's forest resource into the 21st century

    Treesearch

    David J. Nowak; Paul R. O' Connor; [Compilers

    2001-01-01

    The Syracuse Urban Forest Master Plan is one of the most comprehensive urban forest assessments ever developed for a city. This report combines a high-resolution digital urban cover map with field vegetation sampling data from all land uses, a 100-percent street-tree inventory, a survey of city residents regarding desirable and undesirable tree characteristics and...

  17. Master Plan for Educational Facilities: West New York, Hudson County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    West New York is a city in New Jersey with a land area of 1.02 square miles and a population estimated in 1978 to be 42,500 persons. This master plan for educational facilities begins with an overview of the district and utilizes a number of maps to illustrate characteristics of the area, including its topography, relationship to key population…

  18. ACCESS TO QUALITY COMMUNITY COLLEGE OPPORTUNITY, A MASTER PLAN FOR MASSACHUSETTS COMMUNITY COLLEGES THROUGH 1975. SUMMARY REPORT.

    ERIC Educational Resources Information Center

    DEYO, DONALD E.

    THIS SUMMARY REPORT REAPPRAISES THE 1958 MASTER PLAN AND PROJECTS THE COMMUNITY COLLEGE SYSTEM TO 1975 ACCORDINGLY. IT COVERS ALL ASPECTS OF SUCH A SYSTEM AND MAY SERVE AS A GUIDE TO OTHER STATE OR REGIONAL PLANNERS. ITS CONSIDERATIONS INCLUDE (1) A PHILOSOPHY OF HIGHER EDUCATION, (2) THE PURPOSE AND FUNCTION OF THE MASSACHUSETTS COMMUNITY COLLEGE…

  19. An Interactive Scheduling Method for Railway Rolling Stock Allocation

    NASA Astrophysics Data System (ADS)

    Otsuki, Tomoshi; Nakajima, Masayoshi; Fuse, Toru; Shimizu, Tadashi; Aisu, Hideyuki; Yasumoto, Takanori; Kaneko, Kenichi; Yokoyama, Nobuyuki

    Experts working for railway schedule planners still have to devote considerable time and effort for creating rolling stock allocation plans. In this paper, we propose a semiautomatic planning method for creating these plans. Our scheduler is able to interactively deal with flexible constraint-expression inputs and to output easy-to-understand failure messages. Owing to these useful features, the scheduler can provide results that are comparable to those obtained by experts and are obtained faster than before.

  20. Using Climate Change Information in Large Scale Coastal Planning: Louisiana's 2017 Coastal Master Plan

    NASA Astrophysics Data System (ADS)

    Reed, D.

    2017-12-01

    The Louisiana coast has suffered severe land loss in recent decades as human activities have exacerbated the effects of natural stressors leading to catastrophic land loss and increased flood threats to coastal communities. Planning for the future requires a recognition of climate change but also leads to the challenge of understanding how different plausible future conditions influence the outcomes of restoration and protection actions. In coastal Louisiana, the $50 billion Coastal master Plan is legislatively required to be revisited every 5 years in order to ensure that plans for the future continue to be based on the best available, but constantly evolving, scientific information. For the 2017 iteration of the Coastal Master Plan, identification of the environmental scenarios to be explored began in 2014 and included both professional judgment regarding the most important drivers of future change, as well as climate change information derived during the National Climate Assessment. The number of scenarios to be explored was limited by both available resources and the need to make the findings accessible to stakeholders and policy makers. Plausible ranges were identified for key drivers of coastal landscape change, including climatic factors such as eustatic sea-level, precipitation and evapotranspiration. Sensitivity analysis was conducted to explore how the coastal landscape changed in response to combinations of values, allowed agency personnel to select three scenarios against which to test the effectiveness of different restoration and protection actions. The 2017 Coastal Master Plan was then developed by exploring the response of different actions to the scenarios, and how project costs also varied depending on future conditions. Such consideration of climate change in coastal planning at the state scale is facilitated by the availability of scientifically valid information on climate change, that has already been reviewed and sourced.

  1. APGEN Scheduling: 15 Years of Experience in Planning Automation

    NASA Technical Reports Server (NTRS)

    Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel

    2014-01-01

    In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

  2. Current Trends in Communication Graduate Degrees: Survey of Communications, Advertising, PR, and IMC Graduate Programs

    ERIC Educational Resources Information Center

    Quesenberry, Keith A.; Coolsen, Michael K.; Wilkerson, Kristen

    2015-01-01

    A survey of 61 master's degree advertising programs reveals significant trends in program titles, curriculum design, course delivery, and students served. The results provide insight for current and planned master's degree programs as research predicts a continued increase in demand for master's education over the next decade. Survey results are…

  3. 40 CFR 60.1535 - What compliance schedule must I include in my State plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What compliance schedule must I include in my State plan? 60.1535 Section 60.1535 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., 1999 Introduction § 60.1535 What compliance schedule must I include in my State plan? (a) Your State...

  4. 40 CFR 60.1535 - What compliance schedule must I include in my State plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What compliance schedule must I include in my State plan? 60.1535 Section 60.1535 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., 1999 Introduction § 60.1535 What compliance schedule must I include in my State plan? (a) Your State...

  5. 40 CFR 60.1535 - What compliance schedule must I include in my State plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What compliance schedule must I include in my State plan? 60.1535 Section 60.1535 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., 1999 Introduction § 60.1535 What compliance schedule must I include in my State plan? (a) Your State...

  6. 40 CFR 60.1535 - What compliance schedule must I include in my State plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What compliance schedule must I include in my State plan? 60.1535 Section 60.1535 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., 1999 Introduction § 60.1535 What compliance schedule must I include in my State plan? (a) Your State...

  7. Optimum-AIV: A planning and scheduling system for spacecraft AIV

    NASA Technical Reports Server (NTRS)

    Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.

    1991-01-01

    A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

  8. Supporting Real-Time Operations and Execution through Timeline and Scheduling Aids

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Pyrzak, Guy; Hashemi, Sam; Ahmed, Samia; McMillin, Kevin Edward; Medwid, Joseph Daniel; Chen, Diana; Hurtle, Esten

    2013-01-01

    Since 2003, the NASA Ames Research Center has been actively involved in researching and advancing the state-of-the-art of planning and scheduling tools for NASA mission operations. Our planning toolkit SPIFe (Scheduling and Planning Interface for Exploration) has supported a variety of missions and field tests, scheduling activities for Mars rovers as well as crew on-board International Space Station and NASA earth analogs. The scheduled plan is the integration of all the activities for the day/s. In turn, the agents (rovers, landers, spaceships, crew) execute from this schedule while the mission support team members (e.g., flight controllers) follow the schedule during execution. Over the last couple of years, our team has begun to research and validate methods that will better support users during realtime operations and execution of scheduled activities. Our team utilizes human-computer interaction principles to research user needs, identify workflow processes, prototype software aids, and user test these. This paper discusses three specific prototypes developed and user tested to support real-time operations: Score Mobile, Playbook, and Mobile Assistant for Task Execution (MATE).

  9. Materials experiment carrier concepts definition study. Volume 3: Programmatics, part 2

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Project logic, schedule and funding information was derived to enable decisions to be made regarding implementation of MEC system development. A master schedule and cost and price estimates (ROM) were developed for a project that consists of development of an all-up MEC, its integration with payloads and its flight on one 90 day mission. In Part 2 of the study a simple initial MEC was defined to accommodate three MPS baseline payloads. The design of this initial MEC is illustrated. The project logic, detailed schedules, and ROM cost estimate relate to a project in which this initial MEC is developed, integrated with payloads and flown once for 180 days.

  10. Market-Based Approaches to Managing Science Return from Planetary Missions

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.; Porter, David; Hanson, Robin

    1996-01-01

    A research plan is described for the design and testing of a method for the planning and negotiation of science observations. The research plan is presented in relation to the fact that the current method, which involves a hierarchical process of science working groups, is unsuitable for the planning of the Cassini mission. The research plan involves the market-based approach in which participants are allocated budgets of scheduling points. The points are used to provide an intensity of preference for the observations being scheduled. In this way, the schedulers do not have to limit themselves to solving major conflicts, but try to maximize the number of scheduling points that result in a conflict-free timeline. Incentives are provided for the participants by the fixed budget concerning their tradeoff decisions. A degree of feedback is provided in the process so that the schedulers may rebid based on the current timeline.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haggard, K.; Cooper, P.; McDonald, M.

    The authors along with Catriona Gay, Dan Panetta, and Doug Williams, served as sustainability consultants to Sasaki Assoc. who are preparing the master plan for the new Cal. State Univ. at Monterey Bay. This project is a product of conversion of the Ft. Ord Military Reservation to a new California State campus and other facilities. This paper describes proposals made to Sasaki and campus committees regarding concepts of sustainability that can be incorporated into the master plan.

  12. Flexible Coordination in Resource-Constrained Domains

    DTIC Science & Technology

    1994-07-01

    Experiments (TIEs) with planning technologies developed at both BBN (FMERG) and SRI ( SOCAP ). We have also exported scheduling support capabilities provided by...SRI’s SOCAP course of action (COA) plan generator. "* Development and demonstration of distributed, multi-level deployment scheduling - Through analysis...scheduler was adapted for integration with the SOCAP planning system to provide feedback on transportation feasibility during generation of the

  13. Plant operation planning and scheduling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jammar, R.J.

    When properly designed, planning and scheduling can actually add millions of dollars per year to the bottom line. Planning and scheduling is a continuum of decisions starting with crude selection and ending with establishing short-term targets for crude processing and blending. It also includes maintaining optimization and operation simulation models. It is thought that conservatively, a refinery may save from $5 million to $10 million a year if it pays more attention to the processes behind proper planning and scheduling. Of course, the amount of savings can reach staggering proportions for companies now at the bottom of the Solomon Associatesmore » Inc. refinery performance ranking.« less

  14. Compiling Planning into Scheduling: A Sketch

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Crawford, James M.; Smith, David E.

    2004-01-01

    Although there are many approaches for compiling a planning problem into a static CSP or a scheduling problem, current approaches essentially preserve the structure of the planning problem in the encoding. In this pape: we present a fundamentally different encoding that more accurately resembles a scheduling problem. We sketch the approach and argue, based on an example, that it is possible to automate the generation of such an encoding for problems with certain properties and thus produce a compiler of planning into scheduling problems. Furthermore we argue that many NASA problems exhibit these properties and that such a compiler would provide benefits to both theory and practice.

  15. 75 FR 52993 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... information system used to track case files involving internal agency investigations. 13. Department of... Inspection Service (N1-463-09-10, 1 item, 1 temporary item). Master files of an electronic information system... an electronic information system containing data that supports financial management and accounting...

  16. PRACTICAL: Planning and Resource Allocation in C2-Domains With Time Critical Algorithms (PRACTICAL: Planning en Allocatie in C2-Domeinen Met Tijdkritische Algoritmen)

    DTIC Science & Technology

    1993-02-01

    the (re)planning framework, incorporating the demonstrators CALIGULA and ALLOCATOR for resource allocation and scheduling respectively. In the Command...demonstrator CALIGULA for the problem of allocating frequencies to a radio link network. The problems in the domain of scheduling are dealt with. which has...demonstrating the (re)planning framework, incorporating the demonstrators CALIGULA and ALLOCATOR for resource allocation and scheduling respectively

  17. 14 CFR 151.27 - Procedures: Application, plans, specifications, and appraisals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... layout plan approved by the Administrator; and (2) Preliminary plans and specifications in enough detail... accomplishing the project in accordance with the master plan layout, the rules in subparts B and C and...

  18. 14 CFR 151.27 - Procedures: Application, plans, specifications, and appraisals.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... layout plan approved by the Administrator; and (2) Preliminary plans and specifications in enough detail... accomplishing the project in accordance with the master plan layout, the rules in subparts B and C and...

  19. 29 CFR 1952.173 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Inservice training plans for enforcement personnel will be developed within 18 months of plan approval. (f... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS California § 1952.173 Developmental schedule. (a) Within 1 year following plan approval, legislation will be enacted authorizing complete...

  20. 42 CFR 441.156 - Team developing individual plan of care.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... mental diseases, and a psychologist who has a master's degree in clinical psychology or who has been... individuals. (4) A psychologist who has a master's degree in clinical psychology or who has been certified by...

  1. 42 CFR 441.156 - Team developing individual plan of care.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... mental diseases, and a psychologist who has a master's degree in clinical psychology or who has been... individuals. (4) A psychologist who has a master's degree in clinical psychology or who has been certified by...

  2. 42 CFR 441.156 - Team developing individual plan of care.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... mental diseases, and a psychologist who has a master's degree in clinical psychology or who has been... individuals. (4) A psychologist who has a master's degree in clinical psychology or who has been certified by...

  3. 42 CFR 441.156 - Team developing individual plan of care.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... mental diseases, and a psychologist who has a master's degree in clinical psychology or who has been... individuals. (4) A psychologist who has a master's degree in clinical psychology or who has been certified by...

  4. 42 CFR 441.156 - Team developing individual plan of care.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... mental diseases, and a psychologist who has a master's degree in clinical psychology or who has been... individuals. (4) A psychologist who has a master's degree in clinical psychology or who has been certified by...

  5. Implementing the enterprise master patient index.

    PubMed

    Adragna, L

    1998-10-01

    In implementing a cross-facility initiative, the importance of planning and understanding the implications for all facilities can't be overlooked. Here's how one integrated delivery network navigated the challenges of implementing a cross-facility enterprise master patient index.

  6. Expert systems tools for Hubble Space Telescope observation scheduling

    NASA Technical Reports Server (NTRS)

    Miller, Glenn; Rosenthal, Don; Cohen, William; Johnston, Mark

    1987-01-01

    The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

  7. 76 FR 82319 - Gulf of Mexico (GOM), Outer Continental Shelf (OCS), Western Planning Area (WPA) and Central...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... Continental Shelf (OCS), Western Planning Area (WPA) and Central Planning Area (CPA), Oil and Gas Lease Sales... prepared a Draft EIS on oil and gas lease sales tentatively scheduled in 2012-2017 in the WPA and CPA... scheduled for the WPA and five annual areawide lease sales are scheduled for the CPA. The proposed WPA lease...

  8. Planning and scheduling for success

    NASA Technical Reports Server (NTRS)

    Manzanera, Ignacio

    1994-01-01

    Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

  9. Temporal planning for transportation planning and scheduling

    NASA Technical Reports Server (NTRS)

    Frederking, Robert E.; Muscettola, Nicola

    1992-01-01

    In this paper we describe preliminary work done in the CORTES project, applying the Heuristic Scheduling Testbed System (HSTS) to a transportation planning and scheduling domain. First, we describe in more detail the transportation problems that we are addressing. We then describe the fundamental characteristics of HSTS and we concentrate on the representation of multiple capacity resources. We continue with a more detailed description of the transportation planning problem that we have initially addressed in HSTS and of its solution. Finally we describe future directions for our research.

  10. DPSC (Defense Personnel Support Center) Total Quality Management Master Plan

    DTIC Science & Technology

    1989-07-01

    SUBTITLE 5. FUNDING NUMBERS DPSC Total Quality Management Master Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) B. PERFORMING...quality supported solider, sailor, airman and marine. % j cl 1 14. SUBJECT TERMS I 1S. NUMBER OF PAGES TQM (Total Quality Management ), Continuous...THE COMMANDER ON TOTAL QUALITY MANAGEMENT i SECTION I INTRODUCTION 1 II CONCEPTS 6 TQM Basics 7 Continuous Process Improvement 7 DoD TQM Philosophy 9

  11. Master Plan of Operation for Preparing a Programme of Inter-Related Services for Children in Afghanistan, 1977-1978. Part I: The Framework; Part II: The Programme.

    ERIC Educational Resources Information Center

    United Nations Children's Fund, Kabul (Afghanistan).

    This Master Plan of Operation has two parts: The Framework and the Program. Part I (the Framework) sets out the articles of agreement between the Government of Afghanistan and the United Nations Children's Fund (UNICEF) concerning a 1-year program for the improvement of social services for children and mothers regarded as the most disadvantaged…

  12. The Development of the Comic Spirit in 17th Century England from James Shirley to William Congreve. Curriculum Projects, April 7-June 16, 1992. The Huntington Theatre Company Master Works Study in Restoration Comedy.

    ERIC Educational Resources Information Center

    Huntington Theatre Co., Boston, MA.

    Developed by the participants of the Huntington Theatre Company's Master Works Study in Restoration Comedy, this collection presents one-day lesson plans and curriculum projects for teaching Restoration comedy. The collection offers 15 one-day lesson plans and 15 curriculum projects (ranging over several weeks) suitable for secondary school…

  13. 76 FR 43354 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ...). Master files of an electronic information system containing network security information such as lists of... scores. 11. Department of Homeland Security, U.S. Immigration and Customs Enforcement (N1-567-11-5, 2... enforcement officers to receive agency credentials. 12. Department of Homeland Security, U.S. Immigration and...

  14. SPANR planning and scheduling

    NASA Astrophysics Data System (ADS)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  15. Chandra mission scheduling on-orbit experience

    NASA Astrophysics Data System (ADS)

    Bucher, Sabina; Williams, Brent; Pendexter, Misty; Balke, David

    2008-07-01

    Scheduling observatory time to maximize both day-to-day science target integration time and the lifetime of the observatory is a formidable challenge. Furthermore, it is not a static problem. Of course, every schedule brings a new set of observations, but the boundaries of the problem change as well. As spacecraft ages, its capabilities may degrade. As in-flight experience grows, capabilities may expand. As observing programs are completed, the needs and expectations of the science community may evolve. Changes such as these impact the rules by which a mission scheduled. In eight years on orbit, the Chandra X-Ray Observatory Mission Planning process has adapted to meet the challenge of maximizing day-to-day and mission lifetime science return, despite a consistently evolving set of scheduling constraints. The success of the planning team has been achieved, not through the use of complex algorithms and optimization routines, but through processes and home grown tools that help individuals make smart short term and long term Mission Planning decisions. This paper walks through the processes and tools used to plan and produce mission schedules for the Chandra X-Ray Observatory. Nominal planning and scheduling, target of opportunity response, and recovery from on-board autonomous safing actions are all addressed. Evolution of tools and processes, best practices, and lessons learned are highlighted along the way.

  16. Incorporating natural hazard assessments into municipal master-plans; case-studies from Israel

    NASA Astrophysics Data System (ADS)

    Katz, Oded

    2010-05-01

    The active Dead Sea Rift (DSR) runs along the length of Israel, making the entire state susceptible to earthquake-related hazards. Current building codes generally acknowledge seismic hazards and direct engineers towards earthquake-resistant structures. However, hazard mapping on a scale fit for municipal/governmental planning is subject to local initiative and is currently not mandatory as seems necessary. In the following, a few cases of seismic-hazard evaluation made by the Geological Survey of Israel are presented, emphasizing the reasons for their initiation and the way results were incorporated (or not). The first case is a seismic hazard qualitative micro-zonation invited by the municipality of Jerusalem as part of a new master plan. This work resulted in maps (1:50,000; GIS format) identifying areas prone to (1) amplification of seismic shaking due to site characteristics (outcrops of soft rocks or steep topography) and (2) sites with earthquake induced landslide (EILS) hazard. Results were validated using reports from the 1927, M=6.2 earthquake that originated along the DSR about 30km east of Jerusalem. Although the hazard maps were accepted by municipal authorities, practical use by geotechnical engineers working within the frame of the new master-plan was not significant. The main reason for that is apparently a difference of opinion between the city-engineers responsible for implementing the new master-plan and the geologists responsible of the hazard evaluation. The second case involves evaluation of EILS hazard for two towns located further north along the DSR, Zefat and Tiberias. Both were heavily damaged more than once by strong earthquakes in past centuries. Work was carried out as part of a governmental seismic-hazard reduction program. The results include maps (1:10,000 scales) of sites with high EILS hazard identified within city limits. Maps (in GIS format) were sent to city engineers with reports explaining the methods and results. As far as we know, widespread implementation of the maps within municipal master plans never came about, and there was no open discussion between city engineers and the Geological Survey. The main reasons apparently are (1) a lack, until recently, of mandatory building codes requiring incorporation of EILS hazard; (2) budget priorities; (3) failure to involve municipality personnel in planning and executing the EILS hazard evaluation. These cases demonstrate that for seismic hazard data to be incorporated and implemented within municipal master-plans there needs to be (1) active involvement of municipal officials and engineers from the early planning stages of the evaluation campaign, and (2) a-priori dedication of funds towards implementation of evaluation results.

  17. High Energy Power and Propulsion Capability Roadmap: General Background and Introduction

    NASA Technical Reports Server (NTRS)

    Bankston, Perry

    2005-01-01

    Agency objective are: Strategic Planning Transformation. Advanced Planning Organizational Roles. Public Involvement in Strategic Planning. Strategic Roadmaps and Schedule Capability Roadmaps and Schedule. Purpose of NRC Review. Capability Roadmap Development (Progress to Date).

  18. The application of connectionism to query planning/scheduling in intelligent user interfaces

    NASA Technical Reports Server (NTRS)

    Short, Nicholas, Jr.; Shastri, Lokendra

    1990-01-01

    In the mid nineties, the Earth Observing System (EOS) will generate an estimated 10 terabytes of data per day. This enormous amount of data will require the use of sophisticated technologies from real time distributed Artificial Intelligence (AI) and data management. Without regard to the overall problems in distributed AI, efficient models were developed for doing query planning and/or scheduling in intelligent user interfaces that reside in a network environment. Before intelligent query/planning can be done, a model for real time AI planning and/or scheduling must be developed. As Connectionist Models (CM) have shown promise in increasing run times, a connectionist approach to AI planning and/or scheduling is proposed. The solution involves merging a CM rule based system to a general spreading activation model for the generation and selection of plans. The system was implemented in the Rochester Connectionist Simulator and runs on a Sun 3/260.

  19. Momentum: "Developing Masterful Marketing Plans."

    ERIC Educational Resources Information Center

    Meservey, Lynne D.

    1988-01-01

    Describes how directors can plan and develop a written marketing plan which can increase enrollment at child care centers. Components of successful marketing plans include parent retention; program merchandising; staff and director training; sales promotions; networking; and enrichment programs/fundraising. (NH)

  20. Using Modern Methodologies with Maintenance Software

    NASA Technical Reports Server (NTRS)

    Streiffert, Barbara A.; Francis, Laurie K.; Smith, Benjamin D.

    2014-01-01

    Jet Propulsion Laboratory uses multi-mission software produced by the Mission Planning and Sequencing (MPS) team to process, simulate, translate, and package the commands that are sent to a spacecraft. MPS works under the auspices of the Multi-Mission Ground Systems and Services (MGSS). This software consists of nineteen applications that are in maintenance. The MPS software is classified as either class B (mission critical) or class C (mission important). The scheduling of tasks is difficult because mission needs must be addressed prior to performing any other tasks and those needs often spring up unexpectedly. Keeping track of the tasks that everyone is working on is also difficult because each person is working on a different software component. Recently the group adopted the Scrum methodology for planning and scheduling tasks. Scrum is one of the newer methodologies typically used in agile development. In the Scrum development environment, teams pick their tasks that are to be completed within a sprint based on priority. The team specifies the sprint length usually a month or less. Scrum is typically used for new development of one application. In the Scrum methodology there is a scrum master who is a facilitator who tries to make sure that everything moves smoothly, a product owner who represents the user(s) of the software and the team. MPS is not the traditional environment for the Scrum methodology. MPS has many software applications in maintenance, team members who are working on disparate applications, many users, and is interruptible based on mission needs, issues and requirements. In order to use scrum, the methodology needed adaptation to MPS. Scrum was chosen because it is adaptable. This paper is about the development of the process for using scrum, a new development methodology, with a team that works on disparate interruptible tasks on multiple software applications.

  1. Survey to Determine Flight Plan Data and Flight Scheduling Accuracy

    DOT National Transportation Integrated Search

    1972-01-01

    This survey determined Operational Flight Plan Data and Flight schduling accuracy vs. published schedules an/or stored flight plan data. This accuracy was determined by sampling tracer flights of varying lengths, selected terminals, and high altitude...

  2. Camera Ready Masters. B/M-1 Resource Assessment. B/M-2 Surveying. B/M-3 Tabulation. B/M-4 Selecting Program Goals. B/M-5 Producing CDU's. Career Planning Support System.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Center for Vocational Education.

    This package of camera ready masters is one of a set of twelve documents describing the Career Planning Support System (CPSS) and its use. (CPSS is a comprehensive guidance program management system which (1) provides techniques to improve a high school's career guidance program, (2) focuses on the skills students need to make decisions about and…

  3. Gavins Point Dam/Lewis and Clark Lake Master Plan. Missouri River, Nebraska and South Dakota: Update of Design Memorandum MG-123

    DTIC Science & Technology

    2004-12-01

    plover. These birds nest on barren sandbars close to the water surface downstream from the Gavins Point Dam on the Missouri National Recreational...nest on the barren sand and gravel beaches of the Great Gavins Point Dam/Lewis and Clark Lake Master Plan Update...Nebraska. The four Iowa counties (Pottawattamie, Plymouth , Sioux, Woodbury) within the primary market area had a population of 248,019, which contributed

  4. Environmental Assessment for the Bear Creek Dam and Lake Project Master Plan, South Platte River, Colorado

    DTIC Science & Technology

    2012-09-01

    erosion. Piney Creek alluvium along the low terraces is Holocene in age and rock fragments in this area have igneous or metamorphic lithology with...to the Red Rocks Amphitheatre and Bandimere Speedway, which are a brief drive from the Park. Recreational use of Bear Creek Lake is also... US Army Corps of Engineers ® Omaha District Environmental Assessment for the Bear Creek Dam and Lake Project Master Plan South Platte River

  5. 14 CFR 152.113 - Application requirements: Airport planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Application requirements: Airport planning....113 Application requirements: Airport planning. (a) Application for Federal assistance. An eligible sponsor or planning agency that desires to obtain Federal aid for eligible airport master planning or...

  6. Developing a Robust Strategy for Implementing a Water Resources Master Plan in Lima, Peru

    NASA Astrophysics Data System (ADS)

    Kalra, N.; Groves, D.; Bonzanigo, L.; Molina-Perez, E.

    2015-12-01

    Lima, the capital of Peru, faces significant water stress. It is the fifth largest metropolitan area in Latin America, and the second largest desert city in the world. The city has developed a Master Plan of major investment projects to improve water reliability until 2040. Yet key questions remain. Is the Master Plan sufficient for ensuring reliability in the face of deeply uncertain future climate change and demand? How do uncertain budget and project feasibility conditions shape Lima's options? How should the investments in the plan be prioritized, and can some be delayed? Lima is not alone in facing these planning challenges. Governments invest billions of dollars annually in long-term projects. Yet deep uncertainties pose formidable challenges to making near-term decisions that make long-term sense. The World Bank has spearheaded a community of practice on methods for Decision Making Under Deep Uncertainty (DMU). This pilot project in Peru is the first in-depth application of DMU techniques to water supply planning in a developing country. It builds on prior analysis done in New York, California, and for the Colorado River, yet shows how these methods can be applied in regions which do not have as advanced data or tools available. The project combines three methods in particular -- Robust Decision Making, Decision Scaling, and Adaptive Pathways -- to help Lima implement its Master Plan in a way that is robust, no-regret, and adaptive. It was done in close partnership with SEDAPAL, the water utility company in Lima, and in coordination with other national WRM and meteorological agencies. This talk will: Present the planning challenges Lima and other cities face, including climate change Describe DMU methodologies and how they were applied in collaboration with SEDAPAL Summarize recommendations for achieving long-term water reliability in Lima Suggest how these methodologies can benefit other investment projects in developing countries.

  7. 14 CFR 152.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... use of land near a public airport, that— (1) Obstructs the airspace required for the flight of... and proposed airport facilities. Airport master planning means the development for planning purposes... specific airport. Airport system planning means the development for planning purposes of information and...

  8. 14 CFR 152.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... use of land near a public airport, that— (1) Obstructs the airspace required for the flight of... and proposed airport facilities. Airport master planning means the development for planning purposes... specific airport. Airport system planning means the development for planning purposes of information and...

  9. 14 CFR 152.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... use of land near a public airport, that— (1) Obstructs the airspace required for the flight of... and proposed airport facilities. Airport master planning means the development for planning purposes... specific airport. Airport system planning means the development for planning purposes of information and...

  10. 14 CFR 152.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... use of land near a public airport, that— (1) Obstructs the airspace required for the flight of... and proposed airport facilities. Airport master planning means the development for planning purposes... specific airport. Airport system planning means the development for planning purposes of information and...

  11. 14 CFR 152.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... use of land near a public airport, that— (1) Obstructs the airspace required for the flight of... and proposed airport facilities. Airport master planning means the development for planning purposes... specific airport. Airport system planning means the development for planning purposes of information and...

  12. Advanced Telescopes and Observatories and Scientific Instruments and Sensors Capability Roadmaps: General Background and Introduction

    NASA Technical Reports Server (NTRS)

    Coulter, Dan; Bankston, Perry

    2005-01-01

    Agency objective are: Strategic Planning Transformation. Advanced Planning Organizational Roles. Public Involvement in Strategic Planning. Strategic Roadmaps and Schedule. Capability Roadmaps and Schedule. Purpose of NRC Review. Capability Roadmap Development (Progress to Date).

  13. Using Optimization to Improve Test Planning

    DTIC Science & Technology

    2017-09-01

    friendly and to display the output differently, the test and evaluation test schedule optimization model would be a good tool for the test and... evaluation schedulers. 14. SUBJECT TERMS schedule optimization, test planning 15. NUMBER OF PAGES 223 16. PRICE CODE 17. SECURITY CLASSIFICATION OF...make the input more user-friendly and to display the output differently, the test and evaluation test schedule optimization model would be a good tool

  14. Optimization of nas lemoore scheduling to support a growing aircraft population

    DTIC Science & Technology

    2017-03-01

    requirements, and, without knowing the other squadrons’ flight plans , creates his or her squadron’s flight schedule. Figure 2 illustrates the process each...Lemoore, they do not communicate their flight schedules among themselves; hence, the daily flight plan generated by each squadron is independently...manual process for aircraft flight scheduling at Naval Air Station (NAS) Lemoore accommodates the independent needs of 16 fighter resident squadrons as

  15. Integrated planning and scheduling for Earth science data processing

    NASA Technical Reports Server (NTRS)

    Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.

    1995-01-01

    Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.

  16. Increasing Crew Autonomy for Long Duration Exploration Missions: Self-Scheduling

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Hillenius, Steven; Deliz, Ivonne; Kanefsky, Bob; Zheng, Jimin; Reagan, Marcum L.

    2017-01-01

    Over the last three years, we have been investigating the operational concept of crew self-scheduling as a method of increasing crew autonomy for future exploration missions. Through Playbook, a planning and scheduling software tool, we have incrementally increased the ability for Earth analog mission crews to modify their schedules. Playbook allows the crew to add new activities from scratch, add new activities or groups of activities through a Task List, and reschedule or reassign flexible activities. The crew is also able to identify if plan modifications create violations, i.e., plan constraints not being met. This paper summarizes our observations with qualitative evidence from four NASA Extreme Environment Mission Operations (NEEMO) analog missions that supported self-scheduling as a feasible operational concept.

  17. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  18. Developing an interdisciplinary certificate program in transportation planning.

    DOT National Transportation Integrated Search

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  19. 33 CFR 401.80 - Reporting dangerous cargo.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Reporting dangerous cargo. 401.80... dangerous cargo. (a) The master of any explosive vessel or hazardous cargo vessel shall report to a Seaway station, as set out in Schedule III, the nature, quantity, and IMO classification of the dangerous cargo...

  20. 33 CFR 401.80 - Reporting dangerous cargo.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Reporting dangerous cargo. 401.80... dangerous cargo. (a) The master of any explosive vessel or hazardous cargo vessel shall report to a Seaway station, as set out in Schedule III, the nature, quantity, and IMO classification of the dangerous cargo...

  1. 33 CFR 401.80 - Reporting dangerous cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Reporting dangerous cargo. 401.80... dangerous cargo. (a) The master of any explosive vessel or hazardous cargo vessel shall report to a Seaway station, as set out in Schedule III, the nature, quantity, and IMO classification of the dangerous cargo...

  2. 33 CFR 401.80 - Reporting dangerous cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Reporting dangerous cargo. 401.80... dangerous cargo. (a) The master of any explosive vessel or hazardous cargo vessel shall report to a Seaway station, as set out in Schedule III, the nature, quantity, and IMO classification of the dangerous cargo...

  3. 33 CFR 401.80 - Reporting dangerous cargo.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Reporting dangerous cargo. 401.80... dangerous cargo. (a) The master of any explosive vessel or hazardous cargo vessel shall report to a Seaway station, as set out in Schedule III, the nature, quantity, and IMO classification of the dangerous cargo...

  4. 77 FR 66872 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... lease and exploration. 4. Department of Justice, Agency-wide (DAA-0060-2012-0017, 1 item, 1 temporary.... Department of Justice, Federal Bureau of Investigation (N1-65- 12-1, 3 items, 3 temporary items). Master... victims of child pornography. 6. Department of Justice, Federal Bureau of Investigation (N1-65- 12-4, 5...

  5. Agile Systems Engineering-Kanban Scheduling Subsection

    DTIC Science & Technology

    2017-03-10

    including both online and standalone versions. RESEARCH GOALS The overall Agile SE Management Project research goals are to: 1. Identify agile...March 10, 2017 5 Establish a better technical project management and... Project Management ,” Master of Science Project , Stevens Institute, to be completed in May, 2017. • Smith, Jeffrey, “System of Systems Task

  6. NASA's Human Planetary Landing Systems Capability Roadmap Development: General Background and Introduction

    NASA Technical Reports Server (NTRS)

    Mueller, Rob

    2005-01-01

    General Background and Introduction of Capability Roadmaps Agency Objective. Strategic Planning Transformation. Advanced Planning Organizational Roles. Public Involvement in Strategic Planning. Strategic Roadmaps and Schedule. Capability Roadmaps and Schedule. Purpose of NRC Review. Capability Roadmap Development (Progress to Date)

  7. Mission and science activity scheduling language

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1993-01-01

    To support the distributed and complex operational scheduling required for future National Aeronautics and Space Administration (NASA) missions, a formal, textual language, the Scheduling Applications Interface Language (SAIL), has been developed. Increased geographic dispersion of investigators is leading to distributed mission and science activity planning, scheduling, and operations. SAIL is an innovation which supports the effective and efficient communication of scheduling information among physically dispersed applications in distributed scheduling environments. SAIL offers a clear, concise, unambiguous expression of scheduling information in a readable, hardware independent format. The language concept, syntax, and semantics incorporate language features found useful during five years of research and prototyping with scheduling languages in physically distributed environments. SAIL allows concise specification of mission and science activity plans in a format which promotes repetition and reuse.

  8. Intelligent Planning and Scheduling for Controlled Life Support Systems

    NASA Technical Reports Server (NTRS)

    Leon, V. Jorge

    1996-01-01

    Planning in Controlled Ecological Life Support Systems (CELSS) requires special look ahead capabilities due to the complex and long-term dynamic behavior of biological systems. This project characterizes the behavior of CELSS, identifies the requirements of intelligent planning systems for CELSS, proposes the decomposition of the planning task into short-term and long-term planning, and studies the crop scheduling problem as an initial approach to long-term planning. CELSS is studied in the realm of Chaos. The amount of biomass in the system is modeled using a bounded quadratic iterator. The results suggests that closed ecological systems can exhibit periodic behavior when imposed external or artificial control. The main characteristics of CELSS from the planning and scheduling perspective are discussed and requirements for planning systems are given. Crop scheduling problem is identified as an important component of the required long-term lookahead capabilities of a CELSS planner. The main characteristics of crop scheduling are described and a model is proposed to represent the problem. A surrogate measure of the probability of survival is developed. The measure reflects the absolute deviation of the vital reservoir levels from their nominal values. The solution space is generated using a probability distribution which captures both knowledge about the system and the current state of affairs at each decision epoch. This probability distribution is used in the context of an evolution paradigm. The concepts developed serve as the basis for the development of a simple crop scheduling tool which is used to demonstrate its usefulness in the design and operation of CELSS.

  9. D.C. Public School 1997 Repair Program and Facilities Master Plan. Hearing before the Subcommittee on the District of Columbia of the Committee on Government Reform and Oversight. House of Representatives. One Hundred Fifth Congress, Second Session.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. House Committee on Government Reform and Oversight.

    A Congressional hearing dealt with issues related to the repair program and facilities master plan of the District of Columbia Public Schools (DCPS). Opening remarks by Representative Thomas M. Davis outlined his concern over the delayed opening of the DCPS in the fall of 1997 because of uncompleted roof repairs, and the results from a performance…

  10. Ball Mountain Lake, Jamaica, Vermont. Master Plan for Recreation Resources Development.

    DTIC Science & Technology

    1977-12-01

    Springfield, Vermont 15,695 Brattleboro, Vermont 21,294 Bennington , Vermont 22,536 The balance of the population in the Ball Mountain area is contained...A CORPS OF ENGINEERS WALTHAM A NEW ENGLAND DIV F/6 13/2 DECL MUNTAIN LAKE, JAMAICA. VERMONT . MASTER PL.AN FOR RECREATIO--ETCIU) DE 7ENLSIFE ESG EN-Eh...JAMAICA, VERMONT MASTERPA FOR RECREATION RESOURCES DEVELOPMENT JO - 0 DESIGN MEMORANDUM DW~RIBtMfON STATIEMNT -A DE E B R 1977 Approved for public releris

  11. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  12. Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1992-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

  13. Effects of Escalating and Descending Schedules of Incentives on Cigarette Smoking in Smokers without Plans to Quit

    ERIC Educational Resources Information Center

    Romanowich, Paul; Lamb, R. J.

    2010-01-01

    Contingent incentives can reduce substance abuse. Escalating payment schedules, which begin with a small incentive magnitude and progressively increase with meeting the contingency, increase smoking abstinence. Likewise, descending payment schedules can increase cocaine abstinence. The current experiment enrolled smokers without plans to quit in…

  14. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... additionally planned production of Schedule 3 chemicals. 714.3 Section 714.3 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 3 CHEMICALS § 714.3 Advance...

  15. Centralized mission planning and scheduling system for the Landsat Data Continuity Mission

    USGS Publications Warehouse

    Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki

    2014-01-01

    Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.

  16. Coordinating space telescope operations in an integrated planning and scheduling architecture

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.; Cesta, Amedeo; D'Aloisi, Daniela

    1992-01-01

    The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

  17. A distance learning model in a physical therapy curriculum.

    PubMed

    English, T; Harrison, A L; Hart, A L

    1998-01-01

    In response to the rural health initiative established in 1991, the University of Kentucky has developed an innovative distance learning program of physical therapy instruction that combines classroom lecture and discussion via compressed video technology with laboratory experiences. The authors describe the process of planning, implementing, and evaluating a specific distance learning course in pathomechanics for the professional-level master's-degree physical therapy students at the University of Kentucky. This presentation may serve as a model for teaching distance learning. Descriptions of optimal approaches to preclass preparation, scheduling, course delivery, use of audiovisual aids, use of handout material, and video production are given. Special activities that may enhance or deter the achievement of the learning objectives are outlined, and a problem-solving approach to common problems encountered is presented. An approach to evaluating and comparing course outcomes for the distance learnere is presented. For this particular course, there was no statistically significant difference in the outcome measures utilized to compare the distance learners with the on-site learners.

  18. 14 CFR 152.325 - Financial status report: Airport planning.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Financial status report: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.325 Financial status report: Airport planning. Each sponsor of a project for airport master planning and each planning...

  19. 14 CFR 152.325 - Financial status report: Airport planning.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Financial status report: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.325 Financial status report: Airport planning. Each sponsor of a project for airport master planning and each planning...

  20. 14 CFR 152.325 - Financial status report: Airport planning.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Financial status report: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.325 Financial status report: Airport planning. Each sponsor of a project for airport master planning and each planning...

  1. 14 CFR 152.325 - Financial status report: Airport planning.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Financial status report: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.325 Financial status report: Airport planning. Each sponsor of a project for airport master planning and each planning...

  2. flexplan: Mission Planning System for the Lunar Reconnaissance Orbiter

    NASA Technical Reports Server (NTRS)

    Barnoy, Assaf; Beech, Theresa

    2013-01-01

    flexplan is a mission planning and scheduling (MPS) tool that uses soft algorithms to define mission scheduling rules and constraints. This allows the operator to configure the tool for any mission without the need to modify or recompile code. In addition, flexplan uses an ID system to track every output on the schedule to the input from which it was generated. This allows flexplan to receive feedback as the schedules are executed, and update the status of all activities in a Web-based client. flexplan outputs include various planning reports, stored command loads for the Lunar Reconnaissance Orbiter (LRO), ephemeris loads, and pass scripts for automation.

  3. Provocative Opinion: Let's Master Our Graduate Programs, Not Doctor Them Up

    ERIC Educational Resources Information Center

    Pilar, Frank

    1974-01-01

    Criticizes recent Ph.D. programs carried out in many universities after World War II. Suggests university departments re-institute high quality two-year master's programs designed to train those who plan to make careers in chemistry at an applied level. (CC)

  4. A mission planning concept and mission planning system for future manned space missions

    NASA Technical Reports Server (NTRS)

    Wickler, Martin

    1994-01-01

    The international character of future manned space missions will compel the involvement of several international space agencies in mission planning tasks. Additionally, the community of users requires a higher degree of freedom for experiment planning. Both of these problems can be solved by a decentralized mission planning concept using the so-called 'envelope method,' by which resources are allocated to users by distributing resource profiles ('envelopes') which define resource availabilities at specified times. The users are essentially free to plan their activities independently of each other, provided that they stay within their envelopes. The new developments were aimed at refining the existing vague envelope concept into a practical method for decentralized planning. Selected critical functions were exercised by planning an example, founded on experience acquired by the MSCC during the Spacelab missions D-1 and D-2. The main activity regarding future mission planning tasks was to improve the existing MSCC mission planning system, using new techniques. An electronic interface was developed to collect all formalized user inputs more effectively, along with an 'envelope generator' for generation and manipulation of the resource envelopes. The existing scheduler and its data base were successfully replaced by an artificial intelligence scheduler. This scheduler is not only capable of handling resource envelopes, but also uses a new technology based on neuronal networks. Therefore, it is very well suited to solve the future scheduling problems more efficiently. This prototype mission planning system was used to gain new practical experience with decentralized mission planning, using the envelope method. In future steps, software tools will be optimized, and all data management planning activities will be embedded into the scheduler.

  5. Louisiana Airport System Plan : financial assessment.

    DOT National Transportation Integrated Search

    1992-07-01

    This report is intended to identify costs and estimates for the improvements identified for Louisiana airports participating in the five-year planning horizon. A database was developed from airport master plans and standard unit costs from recent Lou...

  6. Graduate certificate in transportation planning : final report

    DOT National Transportation Integrated Search

    2008-12-12

    The purpose of this project was to develop and implement a graduate Certificate in Transportation Planning at Texas : A&M University. Texas A&M currently offers instruction in transportation through its Masters of Urban Planning and : Civil Engineeri...

  7. How Home Health Nurses Plan Their Work Schedules: A Qualitative Descriptive Study.

    PubMed

    Irani, Elliane; Hirschman, Karen B; Cacchione, Pamela Z; Bowles, Kathryn H

    2018-06-12

    To describe how home health nurses plan their daily work schedules and what challenges they face during the planning process. Home health nurses are viewed as independent providers and value the nature of their work because of the flexibility and autonomy they hold in developing their work schedules. However, there is limited empirical evidence about how home health nurses plan their work schedules, including the factors they consider during the process and the challenges they face within the dynamic home health setting. Qualitative descriptive design. Semi-structured interviews were conducted with 20 registered nurses who had greater than 2 years of experience in home health and were employed by one of the three participating home health agencies in the mid-Atlantic region of the United States. Data were analyzed using conventional content analysis. Four themes emerged about planning work schedules and daily itineraries: identifying patient needs to prioritize visits accordingly, partnering with patients to accommodate their preferences, coordinating visit timing with other providers to avoid overwhelming patients, and working within agency standards to meet productivity requirements. Scheduling challenges included readjusting the schedule based on patient needs and staffing availability, anticipating longer visits, and maintaining continuity of care with patients. Home health nurses make autonomous decisions regarding their work schedules while considering specific patient and agency factors, and overcome challenges related to the unpredictable nature of providing care in a home health setting. Future research is needed to further explore nurse productivity in home health and improve home health work environments. Home health nurses plan their work schedules to provide high quality care that is patient-centered and timely. The findings also highlight organizational priorities to facilitate continuity of care and support nurses while alleviating the burnout associated with high productivity requirements. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  8. Carishma Gokhale-Welch | NREL

    Science.gov Websites

    planning and strategy. Carishma also supports renewable energy and microgrid projects, energy resilience planning, and assists communities with energy transitions. Education Master of Environmental Management

  9. Alison Holm | NREL

    Science.gov Websites

    renewable energy and energy efficiency into local planning, zoning, and permitting practices; residential and commercial sector solar financing; and resilience planning. Education Master's, Urban and Regional

  10. Collaborative Resource Allocation

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Wax, Allan; Lam, Raymond; Baldwin, John; Borden, Chester

    2007-01-01

    Collaborative Resource Allocation Networking Environment (CRANE) Version 0.5 is a prototype created to prove the newest concept of using a distributed environment to schedule Deep Space Network (DSN) antenna times in a collaborative fashion. This program is for all space-flight and terrestrial science project users and DSN schedulers to perform scheduling activities and conflict resolution, both synchronously and asynchronously. Project schedulers can, for the first time, participate directly in scheduling their tracking times into the official DSN schedule, and negotiate directly with other projects in an integrated scheduling system. A master schedule covers long-range, mid-range, near-real-time, and real-time scheduling time frames all in one, rather than the current method of separate functions that are supported by different processes and tools. CRANE also provides private workspaces (both dynamic and static), data sharing, scenario management, user control, rapid messaging (based on Java Message Service), data/time synchronization, workflow management, notification (including emails), conflict checking, and a linkage to a schedule generation engine. The data structure with corresponding database design combines object trees with multiple associated mortal instances and relational database to provide unprecedented traceability and simplify the existing DSN XML schedule representation. These technologies are used to provide traceability, schedule negotiation, conflict resolution, and load forecasting from real-time operations to long-range loading analysis up to 20 years in the future. CRANE includes a database, a stored procedure layer, an agent-based middle tier, a Web service wrapper, a Windows Integrated Analysis Environment (IAE), a Java application, and a Web page interface.

  11. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Project eligibility: Airport planning. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport...

  12. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Project eligibility: Airport planning. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport...

  13. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Project eligibility: Airport planning. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport...

  14. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Project eligibility: Airport planning. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport...

  15. Stochastic flow shop scheduling of overlapping jobs on tandem machines in application to optimizing the US Army's deliberate nuclear, biological, and chemical decontamination process, (final report). Master's thesis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Novikov, V.

    1991-05-01

    The U.S. Army's detailed equipment decontamination process is a stochastic flow shop which has N independent non-identical jobs (vehicles) which have overlapping processing times. This flow shop consists of up to six non-identical machines (stations). With the exception of one station, the processing times of the jobs are random variables. Based on an analysis of the processing times, the jobs for the 56 Army heavy division companies were scheduled according to the best shortest expected processing time - longest expected processing time (SEPT-LEPT) sequence. To assist in this scheduling the Gap Comparison Heuristic was developed to select the best SEPT-LEPTmore » schedule. This schedule was then used in balancing the detailed equipment decon line in order to find the best possible site configuration subject to several constraints. The detailed troop decon line, in which all jobs are independent and identically distributed, was then balanced. Lastly, an NBC decon optimization computer program was developed using the scheduling and line balancing results. This program serves as a prototype module for the ANBACIS automated NBC decision support system.... Decontamination, Stochastic flow shop, Scheduling, Stochastic scheduling, Minimization of the makespan, SEPT-LEPT Sequences, Flow shop line balancing, ANBACIS.« less

  16. Understanding London's Water Supply Tradeoffs When Scheduling Interventions Under Deep Uncertainty

    NASA Astrophysics Data System (ADS)

    Huskova, I.; Matrosov, E. S.; Harou, J. J.; Kasprzyk, J. R.; Reed, P. M.

    2015-12-01

    Water supply planning in many major world cities faces several challenges associated with but not limited to climate change, population growth and insufficient land availability for infrastructure development. Long-term plans to maintain supply-demand balance and ecosystem services require careful consideration of uncertainties associated with future conditions. The current approach for London's water supply planning utilizes least cost optimization of future intervention schedules with limited uncertainty consideration. Recently, the focus of the long-term plans has shifted from solely least cost performance to robustness and resilience of the system. Identifying robust scheduling of interventions requires optimizing over a statistically representative sample of stochastic inputs which may be computationally difficult to achieve. In this study we optimize schedules using an ensemble of plausible scenarios and assess how manipulating that ensemble influences the different Pareto-approximate intervention schedules. We investigate how a major stress event's location in time as well as the optimization problem formulation influence the Pareto-approximate schedules. A bootstrapping method that respects the non-stationary trend of climate change scenarios and ensures the even distribution of the major stress event in the scenario ensemble is proposed. Different bootstrapped hydrological scenario ensembles are assessed using many-objective scenario optimization of London's future water supply and demand intervention scheduling. However, such a "fixed" scheduling of interventions approach does not aim to embed flexibility or adapt effectively as the future unfolds. Alternatively, making decisions based on the observations of occurred conditions could help planners who prefer adaptive planning. We will show how rules to guide the implementation of interventions based on observations may result in more flexible strategies.

  17. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.4 Advance declaration requirements for additionally planned production... additionally planned production, processing, or consumption of Schedule 2 chemicals. 713.4 Section 713.4...

  18. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS ACTIVITIES INVOLVING SCHEDULE 2 CHEMICALS § 713.4 Advance declaration requirements for additionally planned production... additionally planned production, processing, or consumption of Schedule 2 chemicals. 713.4 Section 713.4...

  19. Guidance for Planning and Conduct of Field Exercises at the Maneuver Company Level. Improved Army Training and Evaluation Program (ARTEP) Methods for Unit Evaluation

    DTIC Science & Technology

    1980-09-01

    SECURITY CLA,$S (of this report) Unclassified 15a. DECLASSI FICATION/ DOWNGRADING SCHEDULE 16. DISTRIEBJTiON. STATEMENIT (of this Report) Approved for...evaluation plan sketch is essentially a preliminary schedule out- lining the order by day and time of day that the ARTEP missions previously selected (see...individual plans, which parallel the normal coordinating staff functions, are as follows: * The Schedule of Events - includes a list of major missions

  20. Distribution of a Generic Mission Planning and Scheduling Toolkit for Astronomical Spacecraft

    NASA Technical Reports Server (NTRS)

    Kleiner, Steven C.

    1998-01-01

    This 2-year report describes the progress made to date on the project to package and distribute the planning and scheduling toolkit for the SWAS astronomical spacecraft. SWAS was scheduled to be launched on a Pegasus XL vehicle in fall 1995. Three separate failures in the launch vehicle have delayed the SWAS launch. The researchers have used this time to continue developing scheduling algorithms and GUI design. SWAS is expected to be launched this year.

  1. A Planning Revolution

    NASA Technical Reports Server (NTRS)

    Heneghan, C.

    1999-01-01

    The traditional centralized planning and scheduling of complex fast moving projects are value-added activites. However, centralized scheduling has some severe deficiencies that have plagued managers since the Polaris project when PERT analysis was invented.

  2. Orange County intelligent vehicle/highway systems study : IVHS action plan

    DOT National Transportation Integrated Search

    1997-01-21

    This report is a result of the efforts undertaken for Task 6 of the Orange County : Intelligent Vehicle-Highway Systems (IVHS) Study, the development of an Action Plan for : implementation of the Orange County IVHS Master Plan.

  3. Data management and processing plan, Department of Applied Geodesy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-08-01

    This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL.

  4. AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule. [San Juan National Forest pilot test

    NASA Technical Reports Server (NTRS)

    Yao, S. S. (Principal Investigator)

    1981-01-01

    The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

  5. Strategic Planning for Computer-Based Educational Technology.

    ERIC Educational Resources Information Center

    Bozeman, William C.

    1984-01-01

    Offers educational practitioners direction for the development of a master plan for the implementation and application of computer-based educational technology by briefly examining computers in education, discussing organizational change from a theoretical perspective, and presenting an overview of the planning strategy known as the planning and…

  6. 77 FR 55864 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-11

    .... ML111940200), which approved the RBS Cyber Security Plan and associated implementation milestone schedule. The Cyber Security Plan Implementation Schedule contained in the licensee's letter dated April 4, 2011... consequences of an accident previously evaluated? Response: No. The proposed change to the Cyber Security Plan...

  7. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling... Memoranda; determination of final project boundaries; and preliminary real estate work to the point where... estate activities of the Corps are extremely sensitive, since they disrupt the lives of individuals and...

  8. 46 CFR 122.503 - Voyage plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Voyage plan. 122.503 Section 122.503 Shipping COAST... Emergencies § 122.503 Voyage plan. (a) The master of the following vessels shall prepare a voyage plan: (1) A... United States Great Lakes port from a Canadian Great Lakes port. (b) The voyage plan required by...

  9. Dynamic scheduling and planning parallel observations on large Radio Telescope Arrays with the Square Kilometre Array in mind

    NASA Astrophysics Data System (ADS)

    Buchner, Johannes

    2011-12-01

    Scheduling, the task of producing a time table for resources and tasks, is well-known to be a difficult problem the more resources are involved (a NP-hard problem). This is about to become an issue in Radio astronomy as observatories consisting of hundreds to thousands of telescopes are planned and operated. The Square Kilometre Array (SKA), which Australia and New Zealand bid to host, is aiming for scales where current approaches -- in construction, operation but also scheduling -- are insufficent. Although manual scheduling is common today, the problem is becoming complicated by the demand for (1) independent sub-arrays doing simultaneous observations, which requires the scheduler to plan parallel observations and (2) dynamic re-scheduling on changed conditions. Both of these requirements apply to the SKA, especially in the construction phase. We review the scheduling approaches taken in the astronomy literature, as well as investigate techniques from human schedulers and today's observatories. The scheduling problem is specified in general for scientific observations and in particular on radio telescope arrays. Also taken into account is the fact that the observatory may be oversubscribed, requiring the scheduling problem to be integrated with a planning process. We solve this long-term scheduling problem using a time-based encoding that works in the very general case of observation scheduling. This research then compares algorithms from various approaches, including fast heuristics from CPU scheduling, Linear Integer Programming and Genetic algorithms, Branch-and-Bound enumeration schemes. Measures include not only goodness of the solution, but also scalability and re-scheduling capabilities. In conclusion, we have identified a fast and good scheduling approach that allows (re-)scheduling difficult and changing problems by combining heuristics with a Genetic algorithm using block-wise mutation operations. We are able to explain and eradicate two problems in the literature: The inability of a GA to properly improve schedules and the generation of schedules with frequent interruptions. Finally, we demonstrate the scheduling framework for several operating telescopes: (1) Dynamic re-scheduling with the AUT Warkworth 12m telescope, (2) Scheduling for the Australian Mopra 22m telescope and scheduling for the Allen Telescope Array. Furthermore, we discuss the applicability of the presented scheduling framework to the Atacama Large Millimeter/submillimeter Array (ALMA, in construction) and the SKA. In particular, during the development phase of the SKA, this dynamic, scalable scheduling framework can accommodate changing conditions.

  10. A Study of Career Development, Learning Motivation, and Learning Satisfaction of Adult Learners in Unconventional Scheduling Graduate Programs

    ERIC Educational Resources Information Center

    Chu, Hui-Chin; Hsieh, Mei-Chi; Chang, Shan-Chih

    2007-01-01

    The study aimed at investigating the relationships among career development, learning motivation, and learning satisfaction of adult learners in master's programs at S University. Questionnaires were distributed with 211 valid returns (71%). The results indicated that some of the demographics are factors affecting both of the learners' learning…

  11. 36 CFR 1237.26 - What materials and processes must agencies use to create audiovisual records?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) If using reversal type processing, require full photographic reversal; i.e., develop, bleach, expose...-digital or scanned digital images that are scheduled as permanent or unscheduled, a record (or master) version of each image must be comparable in quality to a 35 mm film photograph or better, and must be...

  12. 36 CFR 1237.26 - What materials and processes must agencies use to create audiovisual records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) If using reversal type processing, require full photographic reversal; i.e., develop, bleach, expose...-digital or scanned digital images that are scheduled as permanent or unscheduled, a record (or master) version of each image must be comparable in quality to a 35 mm film photograph or better, and must be...

  13. 36 CFR § 1237.26 - What materials and processes must agencies use to create audiovisual records?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... recommendations. (3) If using reversal type processing, require full photographic reversal; i.e., develop, bleach...-digital or scanned digital images that are scheduled as permanent or unscheduled, a record (or master) version of each image must be comparable in quality to a 35 mm film photograph or better, and must be...

  14. 36 CFR 1237.26 - What materials and processes must agencies use to create audiovisual records?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) If using reversal type processing, require full photographic reversal; i.e., develop, bleach, expose...-digital or scanned digital images that are scheduled as permanent or unscheduled, a record (or master) version of each image must be comparable in quality to a 35 mm film photograph or better, and must be...

  15. 36 CFR 1237.26 - What materials and processes must agencies use to create audiovisual records?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) If using reversal type processing, require full photographic reversal; i.e., develop, bleach, expose...-digital or scanned digital images that are scheduled as permanent or unscheduled, a record (or master) version of each image must be comparable in quality to a 35 mm film photograph or better, and must be...

  16. 46 CFR 169.833 - Fire and boat drills.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Fire and boat drills. 169.833 Section 169.833 Shipping... Operations Tests, Drills, and Inspections § 169.833 Fire and boat drills. (a) When the vessel is operating, the master shall conduct a fire and boat drill each week. The scheduling of drills is at the...

  17. 46 CFR 169.833 - Fire and boat drills.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Fire and boat drills. 169.833 Section 169.833 Shipping... Operations Tests, Drills, and Inspections § 169.833 Fire and boat drills. (a) When the vessel is operating, the master shall conduct a fire and boat drill each week. The scheduling of drills is at the...

  18. 46 CFR 169.833 - Fire and boat drills.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Fire and boat drills. 169.833 Section 169.833 Shipping... Operations Tests, Drills, and Inspections § 169.833 Fire and boat drills. (a) When the vessel is operating, the master shall conduct a fire and boat drill each week. The scheduling of drills is at the...

  19. 46 CFR 169.833 - Fire and boat drills.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Fire and boat drills. 169.833 Section 169.833 Shipping... Operations Tests, Drills, and Inspections § 169.833 Fire and boat drills. (a) When the vessel is operating, the master shall conduct a fire and boat drill each week. The scheduling of drills is at the...

  20. 46 CFR 169.833 - Fire and boat drills.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Fire and boat drills. 169.833 Section 169.833 Shipping... Operations Tests, Drills, and Inspections § 169.833 Fire and boat drills. (a) When the vessel is operating, the master shall conduct a fire and boat drill each week. The scheduling of drills is at the...

  1. Institutional Repositories: The Experience of Master's and Baccalaureate Institutions

    ERIC Educational Resources Information Center

    Markey, Karen; St. Jean, Beth; Soo, Young Rieh; Yakel, Elizabeth; Kim, Jihyun

    2008-01-01

    In 2006, MIRACLE Project investigators censused library directors at all U.S. academic institutions about their activities planning, pilot testing, and implementing the institutional repositories on their campuses. Out of 446 respondents, 289 (64.8 percent) were from master's and baccalaureate institutions (M&BIs) where few operational…

  2. Deep space network resource scheduling approach and application

    NASA Technical Reports Server (NTRS)

    Eggemeyer, William C.; Bowling, Alan

    1987-01-01

    Deep Space Network (DSN) resource scheduling is the process of distributing ground-based facilities to track multiple spacecraft. The Jet Propulsion Laboratory has carried out extensive research to find ways of automating this process in an effort to reduce time and manpower costs. This paper presents a resource-scheduling system entitled PLAN-IT with a description of its design philosophy. The PLAN-IT's current on-line usage and limitations in scheduling the resources of the DSN are discussed, along with potential enhancements for DSN application.

  3. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  4. A Planning Guide for Instructional Networks, Part I.

    ERIC Educational Resources Information Center

    Daly, Kevin F.

    1994-01-01

    Discusses three phases in implementing a master plan for a school-based local area network (LAN): (1) network software selection; (2) hardware selection, network topology, and site preparation; and (3) implementation time table. Sample planning and specification worksheets and a list of planning guides are included. (Contains six references.) (KRN)

  5. DCASR (Defense Contract Administration Services Region) Boston, Strategic/Total Quality Management Master Plan Using Management by Planning (MBP)

    DTIC Science & Technology

    1989-06-01

    employees. A policy consists of targets, plans, and target values. Policy Deployment: One English translation for hoshin kanri . (Others are management by...policy and hoshin planning.) Policy deployment orchestrates continuous improvement in a way that fosters individual initiative and alignment. Process

  6. 46 CFR 154.1816 - Cargo location plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo location plan. 154.1816 Section 154.1816 Shipping... FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Operations § 154.1816 Cargo location plan. The master shall ensure that: (a) A cargo location plan is prepared that gives: (1) The location and...

  7. Information Requirements Analyses for Transatmospheric Vehicles

    DTIC Science & Technology

    1992-06-01

    include takeoff inclination, Mach number/fuel burn schedule , planned headings, planned altitudes, threat types/locations, communications satel- lite...network availability schedules , and P/L/target-specific mission events. The mission materials are transferred to the TAV by means of magnetic media...constraints. It also monitors actual fuel consumption, compares it against the mission fuel schedule , predicts rest-of-mission fuel consumption, and

  8. Biennial Report of Progress under and Compliance with the Master Plan for Vocational Education and an Evaluation of Vocational Education Programs, as Reported by the State Board of Education. Submitted to the Governor, Lieutenant Governor, Speaker of the House, Seventy-First Texas Legislature, and the Texas Council on Vocational Education, 1987-1988.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    This biennial report presents: (1) information regarding progress under and compliance with the master plan for vocational education in Texas during the school years 1986-87 and 1987-88 and information regarding activities conducted during the 1988-89 school year where appropriate; and (2) quantitative and qualitative evaluative information on…

  9. Multi-Satellite Observation Scheduling for Large Area Disaster Emergency Response

    NASA Astrophysics Data System (ADS)

    Niu, X. N.; Tang, H.; Wu, L. X.

    2018-04-01

    an optimal imaging plan, plays a key role in coordinating multiple satellites to monitor the disaster area. In the paper, to generate imaging plan dynamically according to the disaster relief, we propose a dynamic satellite task scheduling method for large area disaster response. First, an initial robust scheduling scheme is generated by a robust satellite scheduling model in which both the profit and the robustness of the schedule are simultaneously maximized. Then, we use a multi-objective optimization model to obtain a series of decomposing schemes. Based on the initial imaging plan, we propose a mixed optimizing algorithm named HA_NSGA-II to allocate the decomposing results thus to obtain an adjusted imaging schedule. A real disaster scenario, i.e., 2008 Wenchuan earthquake, is revisited in terms of rapid response using satellite resources and used to evaluate the performance of the proposed method with state-of-the-art approaches. We conclude that our satellite scheduling model can optimize the usage of satellite resources so as to obtain images in disaster response in a more timely and efficient manner.

  10. On-the-fly scheduling as a manifestation of partial-order planning and dynamic task values.

    PubMed

    Hannah, Samuel D; Neal, Andrew

    2014-09-01

    The aim of this study was to develop a computational account of the spontaneous task ordering that occurs within jobs as work unfolds ("on-the-fly task scheduling"). Air traffic control is an example of work in which operators have to schedule their tasks as a partially predictable work flow emerges. To date, little attention has been paid to such on-the-fly scheduling situations. We present a series of discrete-event models fit to conflict resolution decision data collected from experienced controllers operating in a high-fidelity simulation. Our simulations reveal air traffic controllers' scheduling decisions as examples of the partial-order planning approach of Hayes-Roth and Hayes-Roth. The most successful model uses opportunistic first-come-first-served scheduling to select tasks from a queue. Tasks with short deadlines are executed immediately. Tasks with long deadlines are evaluated to assess whether they need to be executed immediately or deferred. On-the-fly task scheduling is computationally tractable despite its surface complexity and understandable as an example of both the partial-order planning strategy and the dynamic-value approach to prioritization.

  11. Technology for planning and scheduling under complex constraints

    NASA Astrophysics Data System (ADS)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  12. 6. PHOTOCOPY, PLAN AND SCHEDULE DRAWING OF MESS HALL. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. PHOTOCOPY, PLAN AND SCHEDULE DRAWING OF MESS HALL. - NIKE Missile Base SL-40, Mess Hall, East central portion of base, southeast of Barracks No. 2, northwest of Administration Building, Hecker, Monroe County, IL

  13. Scheduling Future Water Supply Investments Under Uncertainty

    NASA Astrophysics Data System (ADS)

    Huskova, I.; Matrosov, E. S.; Harou, J. J.; Kasprzyk, J. R.; Reed, P. M.

    2014-12-01

    Uncertain hydrological impacts of climate change, population growth and institutional changes pose a major challenge to planning of water supply systems. Planners seek optimal portfolios of supply and demand management schemes but also when to activate assets whilst considering many system goals and plausible futures. Incorporation of scheduling into the planning under uncertainty problem strongly increases its complexity. We investigate some approaches to scheduling with many-objective heuristic search. We apply a multi-scenario many-objective scheduling approach to the Thames River basin water supply system planning problem in the UK. Decisions include which new supply and demand schemes to implement, at what capacity and when. The impact of different system uncertainties on scheme implementation schedules are explored, i.e. how the choice of future scenarios affects the search process and its outcomes. The activation of schemes is influenced by the occurrence of extreme hydrological events in the ensemble of plausible scenarios and other factors. The approach and results are compared with a previous study where only the portfolio problem is addressed (without scheduling).

  14. National Research Council Dialogue to Assess Progress on NASA's Title of CRM Capability Roadmap Development: General Background and Introduction

    NASA Technical Reports Server (NTRS)

    Crooke, Julie A.

    2005-01-01

    Contents include the following: General Background and Introduction of Capability Roadmaps "Title." Agency Objective. Strategic Planning Transformation. Advanced Planning Organizational Roles. Public Involvement in Strategic Planning. Strategic Roadmaps and Schedule. Capability Roadmaps and Schedule. Purpose of NRC Review. Capability Roadmap Development (Progress to Date).

  15. National Research Council Dialogue to Assess Progress on NASA's Human Health & Support Systems Capability Roadmap Development: General Background and Introduction

    NASA Technical Reports Server (NTRS)

    Aikins, Jan

    2005-01-01

    Contents include the following: General Background and Introduction of Capability Roadmaps. Agency Objective. Strategic Planning Transformation. Advanced Planning Organizational Roles. Public Involvement in Strategic Planning. Strategic Roadmaps and Schedule. Capability Roadmaps and Schedule. Purpose of NRC Review. Capability Roadmap Development (Progress to Date).

  16. 29 CFR 2520.104-50 - Short plan years, deferral of accountant's examination and report.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Financial statements and accompanying schedules prepared in conformity with the requirements of section 103... respect to the financial statements and accompanying schedules for both of the two plan years. (2) The annual report for the second of the two consecutive plan years shall include: (i) Financial statements...

  17. SOFIA's Choice: Automating the Scheduling of Airborne Observations

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Norvig, Peter (Technical Monitor)

    1999-01-01

    This paper describes the problem of scheduling observations for an airborne telescope. Given a set of prioritized observations to choose from, and a wide range of complex constraints governing legitimate choices and orderings, how can we efficiently and effectively create a valid flight plan which supports high priority observations? This problem is quite different from scheduling problems which are routinely solved automatically in industry. For instance, the problem requires making choices which lead to other choices later, and contains many interacting complex constraints over both discrete and continuous variables. Furthermore, new types of constraints may be added as the fundamental problem changes. As a result of these features, this problem cannot be solved by traditional scheduling techniques. The problem resembles other problems in NASA and industry, from observation scheduling for rovers and other science instruments to vehicle routing. The remainder of the paper is organized as follows. In 2 we describe the observatory in order to provide some background. In 3 we describe the problem of scheduling a single flight. In 4 we compare flight planning and other scheduling problems and argue that traditional techniques are not sufficient to solve this problem. We also mention similar complex scheduling problems which may benefit from efforts to solve this problem. In 5 we describe an approach for solving this problem based on research into a similar problem, that of scheduling observations for a space-borne probe. In 6 we discuss extensions of the flight planning problem as well as other problems which are similar to flight planning. In 7 we conclude and discuss future work.

  18. SU-E-T-628: A Cloud Computing Based Multi-Objective Optimization Method for Inverse Treatment Planning.

    PubMed

    Na, Y; Suh, T; Xing, L

    2012-06-01

    Multi-objective (MO) plan optimization entails generation of an enormous number of IMRT or VMAT plans constituting the Pareto surface, which presents a computationally challenging task. The purpose of this work is to overcome the hurdle by developing an efficient MO method using emerging cloud computing platform. As a backbone of cloud computing for optimizing inverse treatment planning, Amazon Elastic Compute Cloud with a master node (17.1 GB memory, 2 virtual cores, 420 GB instance storage, 64-bit platform) is used. The master node is able to scale seamlessly a number of working group instances, called workers, based on the user-defined setting account for MO functions in clinical setting. Each worker solved the objective function with an efficient sparse decomposition method. The workers are automatically terminated if there are finished tasks. The optimized plans are archived to the master node to generate the Pareto solution set. Three clinical cases have been planned using the developed MO IMRT and VMAT planning tools to demonstrate the advantages of the proposed method. The target dose coverage and critical structure sparing of plans are comparable obtained using the cloud computing platform are identical to that obtained using desktop PC (Intel Xeon® CPU 2.33GHz, 8GB memory). It is found that the MO planning speeds up the processing of obtaining the Pareto set substantially for both types of plans. The speedup scales approximately linearly with the number of nodes used for computing. With the use of N nodes, the computational time is reduced by the fitting model, 0.2+2.3/N, with r̂2>0.99, on average of the cases making real-time MO planning possible. A cloud computing infrastructure is developed for MO optimization. The algorithm substantially improves the speed of inverse plan optimization. The platform is valuable for both MO planning and future off- or on-line adaptive re-planning. © 2012 American Association of Physicists in Medicine.

  19. Planning and scheduling lessons learned study, executive summary

    NASA Technical Reports Server (NTRS)

    Robinson, Toni

    1990-01-01

    The study was performed to document the lessons on planning and scheduling activities for a number of missions and institutional facilities in such a way that they can be applied to future missions; to provide recommendations to both projects and Code 500 that will improve the end-to-end planning and scheduling process; and to identify what, if any, mission characteristics might be related to certain lessons learned. The results are a series of recommendations of both a managerial and technical nature related to the underlying lessons learned.

  20. Planning, scheduling, and control for automatic telescopes

    NASA Technical Reports Server (NTRS)

    Drummond, Mark; Swanson, Keith; Philips, Andy; Levinson, Rich; Bresina, John

    1992-01-01

    This paper presents an argument for the appropriateness of Entropy Reduction Engine (ERE) technology to the planning, scheduling, and control components of Automatic Photoelectric Telescope (APT) management. The paper is organized as follows. In the next section, we give a brief summary of the planning and scheduling requirements for APTs. Following this, in section 3, we give an ERE project precis, couched primarily in terms of project objectives. Section 4 gives a sketch of the match-up between problem and technology, and section 5 outlines where we want to go with this work.

  1. Scheduling algorithm for mission planning and logistics evaluation users' guide

    NASA Technical Reports Server (NTRS)

    Chang, H.; Williams, J. M.

    1976-01-01

    The scheduling algorithm for mission planning and logistics evaluation (SAMPLE) program is a mission planning tool composed of three subsystems; the mission payloads subsystem (MPLS), which generates a list of feasible combinations from a payload model for a given calendar year; GREEDY, which is a heuristic model used to find the best traffic model; and the operations simulation and resources scheduling subsystem (OSARS), which determines traffic model feasibility for available resources. The SAMPLE provides the user with options to allow the execution of MPLS, GREEDY, GREEDY-OSARS, or MPLS-GREEDY-OSARS.

  2. A user interface for a knowledge-based planning and scheduling system

    NASA Technical Reports Server (NTRS)

    Mulvehill, Alice M.

    1988-01-01

    The objective of EMPRESS (Expert Mission Planning and Replanning Scheduling System) is to support the planning and scheduling required to prepare science and application payloads for flight aboard the US Space Shuttle. EMPRESS was designed and implemented in Zetalisp on a 3600 series Symbolics Lisp machine. Initially, EMPRESS was built as a concept demonstration system. The system has since been modified and expanded to ensure that the data have integrity. Issues underlying the design and development of the EMPRESS-I interface, results from a system usability assessment, and consequent modifications are described.

  3. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUBSTRUCTURE, SHOWING GENERAL PLAN AND ELEVATION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  4. Master-slave control with trajectory planning and Bouc-Wen model for tracking control of piezo-driven stage

    NASA Astrophysics Data System (ADS)

    Lu, Xiaojun; Liu, Changli; Chen, Lei

    2018-04-01

    In this paper, a redundant Piezo-driven stage having 3RRR compliant mechanism is introduced, we propose the master-slave control with trajectory planning (MSCTP) strategy and Bouc-Wen model to improve its micro-motion tracking performance. The advantage of the proposed controller lies in that its implementation only requires a simple control strategy without the complexity of modeling to avoid the master PEA's tracking error. The dynamic model of slave PEA system with Bouc-Wen hysteresis is established and identified via particle swarm optimization (PSO) approach. The Piezo-driven stage with operating period T=1s and 2s is implemented to track a prescribed circle. The simulation results show that MSCTP with Bouc-Wen model reduces the trajectory tracking errors to the range of the accuracy of our available measurement.

  5. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; and (5) In the case of a proposed project for airport master planning in a large or medium air traffic hub, in the opinion of the Administrator— (i) There is an appropriate system plan identifying the need for the airport; (ii) The absence of a system plan is due to the failure of the responsible planning...

  6. Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

  7. Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Ludowise, Melissa; McCurdy, Michael; Li, Jack

    2010-01-01

    Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.

  8. Towards a Decision Support System for Space Flight Operations

    NASA Technical Reports Server (NTRS)

    Meshkat, Leila; Hogle, Charles; Ruszkowski, James

    2013-01-01

    The Mission Operations Directorate (MOD) at the Johnson Space Center (JSC) has put in place a Model Based Systems Engineering (MBSE) technological framework for the development and execution of the Flight Production Process (FPP). This framework has provided much added value and return on investment to date. This paper describes a vision for a model based Decision Support System (DSS) for the development and execution of the FPP and its design and development process. The envisioned system extends the existing MBSE methodology and technological framework which is currently in use. The MBSE technological framework currently in place enables the systematic collection and integration of data required for building an FPP model for a diverse set of missions. This framework includes the technology, people and processes required for rapid development of architectural artifacts. It is used to build a feasible FPP model for the first flight of spacecraft and for recurrent flights throughout the life of the program. This model greatly enhances our ability to effectively engage with a new customer. It provides a preliminary work breakdown structure, data flow information and a master schedule based on its existing knowledge base. These artifacts are then refined and iterated upon with the customer for the development of a robust end-to-end, high-level integrated master schedule and its associated dependencies. The vision is to enhance this framework to enable its application for uncertainty management, decision support and optimization of the design and execution of the FPP by the program. Furthermore, this enhanced framework will enable the agile response and redesign of the FPP based on observed system behavior. The discrepancy of the anticipated system behavior and the observed behavior may be due to the processing of tasks internally, or due to external factors such as changes in program requirements or conditions associated with other organizations that are outside of MOD. The paper provides a roadmap for the three increments of this vision. These increments include (1) hardware and software system components and interfaces with the NASA ground system, (2) uncertainty management and (3) re-planning and automated execution. Each of these increments provide value independently; but some may also enable building of a subsequent increment.

  9. Expert mission planning and replanning scheduling system for NASA KSC payload operations

    NASA Technical Reports Server (NTRS)

    Pierce, Roger

    1987-01-01

    EMPRESS (Expert Mission Planning and REplanning Scheduling System) is an expert system created to assist payload mission planners at Kennedy in the long range planning and scheduling of horizontal payloads for space shuttle flights. Using the current flight manifest, these planners develop mission and payload schedules detailing all processing to be performed in the Operations and Checkout building at Kennedy. With the EMPRESS system, schedules are generated quickly using standard flows that represent the tasks and resources required to process a specific horizontal carrier. Resources can be tracked and resource conflicts can be determined and resolved interactively. Constraint relationships between tasks are maintained and can be enforced when a task is moved or rescheduled. The domain, structure, and functionality of the EMPRESS system is briefly designed. The limitations of the EMPRESS system are described as well as improvements expected with the EMPRESS-2 development.

  10. An Optimal Program Initiative Selection Model for USMC Program Objective Memorandum Planning

    DTIC Science & Technology

    1993-03-01

    Programming, Master’s Thesis, Naval Postgraduate School, Monterey, CA, September, 1992. 7. Anderson, S.M., Captain, USA, A Goal Programming R&D Project Funding ... Model of the U.S. Army Strategic Defense Command Using the Analytic Hierarchy Process, Master’s Thesis, Naval Postgraduate School, Monterey, CA

  11. 76 FR 60451 - Questa Ranger District, Carson National Forest; Taos County, NM; Taos Ski Valley's 2010 Master...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... (TSV) 2010 Master Development Plan (MDP). The proposed projects include: Adding new lifts to serve terrain that is currently only accessible by hiking; replacing old lifts; creating new gladed terrain... Adventure Center (snowtubing and snowshoeing trails); and developing a lift-served mountain biking trail...

  12. Resource planning and scheduling of payload for satellite with particle swarm optimization

    NASA Astrophysics Data System (ADS)

    Li, Jian; Wang, Cheng

    2007-11-01

    The resource planning and scheduling technology of payload is a key technology to realize an automated control for earth observing satellite with limited resources on satellite, which is implemented to arrange the works states of various payloads to carry out missions by optimizing the scheme of the resources. The scheduling task is a difficult constraint optimization problem with various and mutative requests and constraints. Based on the analysis of the satellite's functions and the payload's resource constraints, a proactive planning and scheduling strategy based on the availability of consumable and replenishable resources in time-order is introduced along with dividing the planning and scheduling period to several pieces. A particle swarm optimization algorithm is proposed to address the problem with an adaptive mutation operator selection, where the swarm is divided into groups with different probabilities to employ various mutation operators viz., differential evolution, Gaussian and random mutation operators. The probabilities are adjusted adaptively by comparing the effectiveness of the groups to select a proper operator. The simulation results have shown the feasibility and effectiveness of the method.

  13. Interactive experimenters' planning procedures and mission control

    NASA Technical Reports Server (NTRS)

    Desjardins, R. L.

    1973-01-01

    The computerized mission control and planning system routinely generates a 24-hour schedule in one hour of operator time by including time dimensions into experimental planning procedures. Planning is validated interactively as it is being generated segment by segment in the frame of specific event times. The planner simply points a light pen at the time mark of interest on the time line for entering specific event times into the schedule.

  14. Planning In Rural Areas: Evaluation of The Land Resource.

    ERIC Educational Resources Information Center

    Carlson, Steven A.; Denney, Evan

    A rural land use project originated in the early 1970s when a landowner approached the University of Montana's Department of Geography asking for assistance in planning the use of more than 10,000 acres. The planning process evolved into four phases; the first three phases (biophysical assessment, capability analysis, and master planning) have…

  15. 46 CFR 131.945 - Display of plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... § 131.945 Display of plans. Each vessel must have a permanently exhibited, for the guidance of the master and crew members, general arrangement plans showing, for each deck, the various fire-retardant... 46 Shipping 4 2011-10-01 2011-10-01 false Display of plans. 131.945 Section 131.945 Shipping COAST...

  16. 46 CFR 131.945 - Display of plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... § 131.945 Display of plans. Each vessel must have a permanently exhibited, for the guidance of the master and crew members, general arrangement plans showing, for each deck, the various fire-retardant... 46 Shipping 4 2012-10-01 2012-10-01 false Display of plans. 131.945 Section 131.945 Shipping COAST...

  17. 46 CFR 169.853 - Display of plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Display of plans. 169.853 Section 169.853 Shipping COAST... Tests, Drills, and Inspections § 169.853 Display of plans. (a) Each vessel of 100 gross tons and over must have permanently exhibited for the guidance of the master, general arrangement plans for each deck...

  18. 46 CFR 131.945 - Display of plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... § 131.945 Display of plans. Each vessel must have a permanently exhibited, for the guidance of the master and crew members, general arrangement plans showing, for each deck, the various fire-retardant... 46 Shipping 4 2014-10-01 2014-10-01 false Display of plans. 131.945 Section 131.945 Shipping COAST...

  19. 46 CFR 131.945 - Display of plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... § 131.945 Display of plans. Each vessel must have a permanently exhibited, for the guidance of the master and crew members, general arrangement plans showing, for each deck, the various fire-retardant... 46 Shipping 4 2013-10-01 2013-10-01 false Display of plans. 131.945 Section 131.945 Shipping COAST...

  20. 46 CFR 169.853 - Display of plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Display of plans. 169.853 Section 169.853 Shipping COAST... Tests, Drills, and Inspections § 169.853 Display of plans. (a) Each vessel of 100 gross tons and over must have permanently exhibited for the guidance of the master, general arrangement plans for each deck...

  1. 46 CFR 169.853 - Display of plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Display of plans. 169.853 Section 169.853 Shipping COAST... Tests, Drills, and Inspections § 169.853 Display of plans. (a) Each vessel of 100 gross tons and over must have permanently exhibited for the guidance of the master, general arrangement plans for each deck...

  2. 46 CFR 169.853 - Display of plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Display of plans. 169.853 Section 169.853 Shipping COAST... Tests, Drills, and Inspections § 169.853 Display of plans. (a) Each vessel of 100 gross tons and over must have permanently exhibited for the guidance of the master, general arrangement plans for each deck...

  3. 46 CFR 169.853 - Display of plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Display of plans. 169.853 Section 169.853 Shipping COAST... Tests, Drills, and Inspections § 169.853 Display of plans. (a) Each vessel of 100 gross tons and over must have permanently exhibited for the guidance of the master, general arrangement plans for each deck...

  4. Idea Notebook: Wilderness Food Planning in the Computer Age.

    ERIC Educational Resources Information Center

    Drury, Jack K.

    1986-01-01

    Explains the use of a computer as a planning and teaching tool in wilderness trip food planning. Details use of master food list and spreadsheet software such as VisiCalc to provide shopping lists for food purchasing, cost analysis, and diet analysis. (NEC)

  5. National Research Council Dialogue to Assess Progress on NASA's Advanced Modeling, Simulation and Analysis Capability and Systems Engineering Capability Roadmap Development

    NASA Technical Reports Server (NTRS)

    Aikins, Jan

    2005-01-01

    Contents include the following: General Background and Introduction of Capability Roadmaps. Agency Objective. Strategic Planning Transformation. Advanced Planning Organizational Roles. Public Involvement in Strategic Planning. Strategic Roadmaps and Schedule. Capability Roadmaps and Schedule. Purpose of NRC Review. Capability Roadmap Development (Progress to Date).

  6. Forecasting aviation activity by airport

    DOT National Transportation Integrated Search

    2001-07-01

    The Federal Aviation Administration (FAA) has a responsibility to review aviation forecasts that are submitted to the agency in conjunction with airport planning, including airport master plans and environmental studies. FAA reviews such forecasts wi...

  7. KSC-00pp0144

    NASA Image and Video Library

    2000-02-01

    KENNEDY SPACE CENTER, Fla. -- Under gray skies, the Rotating Service Structure rolls back into its protective position around Space Shuttle Endeavour on Launch Pad 39A. The launch of Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9

  8. KSC00pp0144

    NASA Image and Video Library

    2000-02-01

    KENNEDY SPACE CENTER, Fla. -- Under gray skies, the Rotating Service Structure rolls back into its protective position around Space Shuttle Endeavour on Launch Pad 39A. The launch of Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9

  9. KSC00pp0142

    NASA Image and Video Library

    2000-02-01

    KENNEDY SPACE CENTER, Fla. -- Space Shuttle Endeavour sits on Launch Pad 39A waiting for the Rotating Service Structure to be rolled back into its protective position. The launch of Space Shuttle Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9

  10. KSC-00pp0142

    NASA Image and Video Library

    2000-02-01

    KENNEDY SPACE CENTER, Fla. -- Space Shuttle Endeavour sits on Launch Pad 39A waiting for the Rotating Service Structure to be rolled back into its protective position. The launch of Space Shuttle Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9

  11. Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)

    2002-01-01

    The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

  12. Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

  13. An innovative approach for distributed and integrated resources planning for the Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Shinkle, Gerald L.; Weiler, Jerry D.; Willoughby, John K.

    1990-01-01

    This paper presents a planning approach to the Space Station Freedom program which takes into account the widely distributed nature of that program. The program management structure is organized into three major levels: a strategic level, a tactical level, and an execution level. For each level, resource availabilities are determined, the resources are distributed, schedules are built independently within the resource limits, the schedules are integrated into a single schedule, and conflicts are resolved by negotiating requirements and/or relaxing contraints. This approach distributes resources to multiple planning entities in such a way that when the multiple plans are collected, they fit together with minimal modification. The up-front distribution is planned in such a way and to a sufficient degree that a fit is virtually assured.

  14. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  15. A Comparison of Declarative and Hybrid Declarative-Procedural Models for Rover Operations

    NASA Technical Reports Server (NTRS)

    Knight, Russell; Rabideau, Gregg; Lenda, Matthew; Maldague, Pierre

    2012-01-01

    The MAPGEN [2] (Mixed-initiative Activity Plan GENerator) planning system is a great example of a hybrid procedural/declarative system where the advantages of each are leveraged to produce an effective planner/scheduler for Mars Exploration Rover tactical planning. We explore the adaptation of the same domain to an entirely declarative planning system (ASPEN [4] Activity Scheduling and Planning ENvironment), and demonstrate that, with some translation, much of the procedural knowledge encoding is amenable to a declarative knowledge encoding.

  16. Planning Complex Projects Automatically

    NASA Technical Reports Server (NTRS)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  17. Integrated payload and mission planning, phase 3. Volume 1: Integrated payload and mission planning process evaluation

    NASA Technical Reports Server (NTRS)

    Sapp, T. P.; Davin, D. E.

    1977-01-01

    The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.

  18. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  19. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  20. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  1. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the Family and Medical Leave Act § 825.203 Scheduling of intermittent or reduced schedule leave. Eligible... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee...

  2. Human factors issues in the design of user interfaces for planning and scheduling

    NASA Technical Reports Server (NTRS)

    Murphy, Elizabeth D.

    1991-01-01

    The purpose is to provide and overview of human factors issues that impact the effectiveness of user interfaces to automated scheduling tools. The following methods are employed: (1) a survey of planning and scheduling tools; (2) the identification and analysis of human factors issues; (3) the development of design guidelines based on human factors literature; and (4) the generation of display concepts to illustrate guidelines.

  3. Defense Science Board Task Force Report: The Role of Autonomy in DoD Systems

    DTIC Science & Technology

    2012-07-01

    ASD(R&E) and the Military Services should schedule periodic, on-site collaborations that bring together academia, government and not-for-profit labs...expressing UxV activities, increased problem solving, planning and scheduling capabilities to enable dynamic tasking of distributed UxVs and tools for...industrial, governmental and military. Manufacturing has long exploited planning for logistics and matching product demand to production schedules

  4. 40 CFR 52.2578 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2578 Compliance schedules. (a... operator of any stationary source in the Southeast Wisconsin AQCR subject to the following emission limiting regulation in the Wisconsin implementation plan shall comply with the applicable compliance...

  5. 40 CFR 52.2578 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2578 Compliance schedules. (a... operator of any stationary source in the Southeast Wisconsin AQCR subject to the following emission limiting regulation in the Wisconsin implementation plan shall comply with the applicable compliance...

  6. 40 CFR 52.2578 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2578 Compliance schedules. (a... operator of any stationary source in the Southeast Wisconsin AQCR subject to the following emission limiting regulation in the Wisconsin implementation plan shall comply with the applicable compliance...

  7. 40 CFR 52.2578 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2578 Compliance schedules. (a... operator of any stationary source in the Southeast Wisconsin AQCR subject to the following emission limiting regulation in the Wisconsin implementation plan shall comply with the applicable compliance...

  8. 40 CFR 52.2578 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2578 Compliance schedules. (a... operator of any stationary source in the Southeast Wisconsin AQCR subject to the following emission limiting regulation in the Wisconsin implementation plan shall comply with the applicable compliance...

  9. Continual planning and scheduling for managing patient tests in hospital laboratories.

    PubMed

    Marinagi, C C; Spyropoulos, C D; Papatheodorou, C; Kokkotos, S

    2000-10-01

    Hospital laboratories perform examination tests upon patients, in order to assist medical diagnosis or therapy progress. Planning and scheduling patient requests for examination tests is a complicated problem because it concerns both minimization of patient stay in hospital and maximization of laboratory resources utilization. In the present paper, we propose an integrated patient-wise planning and scheduling system which supports the dynamic and continual nature of the problem. The proposed combination of multiagent and blackboard architecture allows the dynamic creation of agents that share a set of knowledge sources and a knowledge base to service patient test requests.

  10. MONROE COMMUNITY COLLEGE CAMPUS PLAN.

    ERIC Educational Resources Information Center

    Caudill, Rowlett, Scott and Associates, Bryan, TX.

    THE MASTER PLANS FOR THE CONSTRUCTION OF THE CAMPUS OF THE NEW MONROE COMMUNITY COLLEGE INCLUDE EDUCATIONAL SPECIFICATIONS, SITE ANALYSIS DATA AND BUILDING PLANS. THE EDUCATIONAL SPECIFICATIONS ARE BASED UPON COMMUNITY NEEDS AND ENROLLMENT PROJECTIONS, AND REFLECT SPACE REQUIREMENTS. IN THE SITE ANALYSIS, FACTORS SUCH AS TOPOGRAPHY, CLIMATE,…

  11. Educational Master Planning: Creative or Cathartic?

    ERIC Educational Resources Information Center

    Rossmeier, Joseph G.

    Recently, Northern Virginia Community College has moved into a new era of institutional development, whereby primary attention to facility planning and increasing enrollments has given way to a comprehensive, program-based, and strategic planning process which transcends all elements of the institution. Recognition is given to the integral…

  12. Progress on the development of a master file of highway safety planning and evaluation data.

    DOT National Transportation Integrated Search

    1981-01-01

    The National Highway Traffic Safety Administration requires each state to submit an annual Highway Safety Plan as a prerequisite for obtaining federal section 402 safety monies. The Highway Safety Plan serves as more than a mechanism for obtaining fu...

  13. Network Control Center User Planning System (NCC UPS)

    NASA Astrophysics Data System (ADS)

    Dealy, Brian

    1991-09-01

    NCC UPS is presented in the form of the viewgraphs. The following subject areas are covered: UPS overview; NCC UPS role; major NCC UPS functional requirements; interactive user access levels; UPS interfaces; interactive user subsystem; interface navigation; scheduling screen hierarchy; interactive scheduling input panels; autogenerated schedule request panel; schedule data tabular display panel; schedule data graphic display panel; graphic scheduling aid design; and schedule data graphic display.

  14. Network Control Center User Planning System (NCC UPS)

    NASA Technical Reports Server (NTRS)

    Dealy, Brian

    1991-01-01

    NCC UPS is presented in the form of the viewgraphs. The following subject areas are covered: UPS overview; NCC UPS role; major NCC UPS functional requirements; interactive user access levels; UPS interfaces; interactive user subsystem; interface navigation; scheduling screen hierarchy; interactive scheduling input panels; autogenerated schedule request panel; schedule data tabular display panel; schedule data graphic display panel; graphic scheduling aid design; and schedule data graphic display.

  15. 46 CFR 167.15-35 - Notice and plans required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SHIPS Inspections § 167.15-35 Notice and plans required. (a) The master, owner, operator, or agent of the vessel shall notify the Officer in Charge, Marine Inspection, whenever the vessel is to be...

  16. 75 FR 74740 - Measure M2 Natural Community Conservation Plan/Habitat Conservation Plan/Master Streambed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... significant direct, indirect, and cumulative impacts on biological resources, land use, air quality, water quality, water resources, socioeconomics, and other environmental issues that could occur with the...

  17. National Research Council Dialogue to Assess Progesss on NASA's Human Exploration Systems and Mobility Capability Roadmap Development: General Background and Introduction

    NASA Technical Reports Server (NTRS)

    Inman, Thomas

    2005-01-01

    General Background and Introduction of Capability Roadmaps: Agency Objective. Strategic Planning Transformation. Advanced Planning Organizational Roles. Public Involvement in Strategic Planning. Strategic Roadmaps and Schedule. Capability Roadmaps and Schedule. Technology and Capability Readiness Levels. Relationships Between Roadmaps. Purpose of NRC Review. Capability Roadmap Development (Team Progress to Date).

  18. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each projectmore » within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.« less

  19. Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Tran, Daniel; Rabideau, Gregg; Schaffer, Steve; Mandl, Daniel; Frye, Stuart

    2010-01-01

    We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

  20. 77 FR 36994 - Questa Ranger District, Carson National Forest; Taos County, NM; Taos Ski Valley's 2010 Master...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... County, NM; Taos Ski Valley's 2010 Master Development Plan--Phase 1 Projects; Additional Filings AGENCY... environmental impact statement for a proposal to authorize several (Phase 1) projects included in the Taos Ski... (ROD) are expected in July 2012. Change in Responsible Official: In addition, this notice changes the...

Top