NASA Technical Reports Server (NTRS)
Tahmasebi, Farhad; Pearce, Robert
2016-01-01
Description of a tool for portfolio analysis of NASA's Aeronautics research progress toward planned community strategic Outcomes is presented. The strategic planning process for determining the community Outcomes is also briefly described. Stakeholder buy-in, partnership performance, progress of supporting Technical Challenges, and enablement forecast are used as the criteria for evaluating progress toward Outcomes. A few illustrative examples are also presented.
Educational Reform and the World of Work: Italy
ERIC Educational Resources Information Center
von Blumenthal, Viktor
1977-01-01
One of a four-issue series on educational reform and the world of work in Europe, this issue discusses educational planning and secondary school reform in Italy. Topics discussed include planning and research in vocational-technical education, and the relation between acquisition of specific skills and scientific and technical progress. (Author/DB)
NASA Technical Reports Server (NTRS)
Tahmasebi, Farhad; Pearce, Robert
2016-01-01
Description of a tool for portfolio analysis of NASA's Aeronautics research progress toward planned community strategic Outcomes is presented. For efficiency and speed, the tool takes advantage of a function developed in Excels Visual Basic for Applications. The strategic planning process for determining the community Outcomes is also briefly discussed. Stakeholder buy-in, partnership performance, progress of supporting Technical Challenges, and enablement forecast are used as the criteria for evaluating progress toward Outcomes. A few illustrative examples of using the tool are also presented.
10 CFR 603.885 - Updated program plans and budgets.
Code of Federal Regulations, 2011 CFR
2011-01-01
... program plans and budgets. In addition to reports on progress to date, a TIA may include a provision requiring the recipient to annually prepare an updated technical plan for future conduct of the research...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.
The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less
USDOT’s Intelligent Transportation Systems (ITS) ITS strategic plan, 2015-2019.
DOT National Transportation Integrated Search
2014-05-01
This document constitutes the Intelligent Transportation Systems Strategic Plan covering the years 2015 to 2019; it builds on the progress of the 2010-2014 plan and presents a wide array of technical, policy, institutional, and organizational concept...
10 CFR 603.1100 - Contracting officer's post-award responsibilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... technical progress, financial status, and future program plans. (b) Tracking and processing of reports... progress reports, and patent reports. (c) Handling payment requests and related matters. For a TIA using advance payments, that includes reviews of progress to verify that there is continued justification for...
Geotechnical support and topical studies for nuclear waste geologic repositories
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-01-01
The present report lists the technical reviews and comments made during the fiscal year 1988 and summarizes the technical progress of the topical studies. In the area of technical assistance, there were numerous activities detailed in the next section. These included 24 geotechnical support activities, including reviews of 6 Study Plans (SP) and participation in 6 SP Review Workshops, review of one whole document Site Characterization Plan (SCP) and participation in the Assembled Document SCP Review Workshops by 6 LBL reviewers; the hosting of a DOE program review, the rewriting of the project statement of work, 2 trips to technicalmore » and planning meetings; preparation of proposed work statements for two new topics for DOE, and 5 instances of technical assistance to DOE. These activities are described in a Table in the following section entitled Geoscience Technical Support for Nuclear Waste Geologic Repositories.''« less
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1982-01-01
A compilation of summary portions of each of the Research and Technology Objectives and Plans (RTOPS) used for management review and control of research currently in progress throughout NASA is presented. Subject, technical monitors, responsible NASA organization, and RTOP number indexes are included.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1981-01-01
A compilation of the summary portions of each of the Research and Technology Objective Plans (RTOP) used for management review and control of research currently in progress throughout NASA is presented. Indexes include: subject, technical monitor, responsible NASA organization, and RTOP number.
DOT National Transportation Integrated Search
2000-12-01
This paper brings together the findings of activities that addressed the impacts of nontechnical barriers and constraints that might impede the progress of Intelligent Transportation Systems (ITS) programs. It discusses how the planning and deploymen...
Research and Technology Objectives and Plans (RTOP), summary
NASA Technical Reports Server (NTRS)
1982-01-01
A compilation of summary portions of each of the Research and Technology Operating Plans (RTOPS) used for management review and control of research currently in progress throughout NASA is presented. Subject, technical monitor, responsible NASA organization, and RTOP number indexes are included.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1980-01-01
A compilation of the summary portions of each of the Research and Technology Objectives and Plans (RTOPS) used for management review and control research currently in progress throughout NASA is presented. Indexes include: subject, technical monitor, responsible NASA organization, and RTOP number.
Research and Technology Operating Plan Summary: Fiscal Year 1973 Research and Technology Program
NASA Technical Reports Server (NTRS)
1972-01-01
Abstracts are presented of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA. This RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and universities. The summary is arranged in five sections consisting of citations and abstracts of the RTOPs and subject, technical monitor, responsible NASA organization, and RTOP number indexes.
24 CFR 1006.430 - Corrective and remedial action.
Code of Federal Regulations, 2011 CFR
2011-04-01
... plan; (3) Made substantial progress in carrying out its program and achieving its quantifiable goals as... to submit progress schedules for completing activities or complying with the requirements of the Act... appropriate technical assistance using existing grant funds or other available resources to overcome the...
44 CFR 206.437 - State administrative plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... requests for advances of funds and reimbursement; (vii) Monitor and evaluate the progress and completion of... technical assistance as required to subgrantee(s); (xi) Comply with the administrative and audit requirements of 44 CFR parts 13 and 206; (xii) Provide quarterly progress reports to the Regional Administrator...
44 CFR 206.437 - State administrative plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... requests for advances of funds and reimbursement; (vii) Monitor and evaluate the progress and completion of... technical assistance as required to subgrantee(s); (xi) Comply with the administrative and audit requirements of 44 CFR parts 13 and 206; (xii) Provide quarterly progress reports to the Regional Administrator...
VOCATIONAL-TECHNICAL FACILITIES PROJECT. PROGRESS REPORT.
ERIC Educational Resources Information Center
CONRAD, M.J.; VALENTINE, I.E.
IN THE FIRST PHASE OF A PROJECT FOR DEVELOPING PLANNING GUIDES FOR VOCATIONAL FACILITIES, THE OVERALL DIRECTION OF A SERIES OF PLANNING GUIDES IS BEING DETERMINED. IN THE SECOND PHASE AT LEAST ONE PLANNING MANUAL WILL BE DEVELOPED TO SERVE AS A MODEL FOR THE FULL SERIES. A LOCAL WORKING GROUP COMPOSED OF THREE SPECIALISTS FROM THE CENTER FOR…
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1990-01-01
The NASA research and technology program for FY 1990 is presented. The summary portions is compiled of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and universities. The first section containing citations and abstracts of the RTOPs is followed by four indices: Subject; Technical Monitor; Responsible NASA Organization; and RTOP number.
Biomass power for rural development. Technical progress report, January 1--March 31, 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Brief progress reports are presented on the following tasks: design packages for retrofits at the Dunkirk Station; fuel supply and site development plans; major equipment guarantees and project risk sharing; power production commitment; power plant site plan, construction and environmental permits; and experimental strategies for system evaluation. The paper then discusses in more detail the following: feedstock development efforts; clone-site testing and genetic studies; and efforts at outreach, extension and technology transfer.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1979-01-01
A compilation of the summary portions of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA is presented along with citations and abstracts of the RTOPs. Indexes include: subject; technical monitor; responsible NASA organization; and RTOP number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1992-01-01
This publication represents the NASA research and technology program for FY92. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOP's is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and technology objectives and plans: Summary fiscal year 1991
NASA Technical Reports Server (NTRS)
1991-01-01
This publication represents the NASA research and technology program for FY 1991. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and in universities. The first section contains citations and abstracts of the RTOP's and is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1993-01-01
This publication represents the NASA research and technology program for FY-93. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOP's is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1988-01-01
This publication represents the NASA research and technology program for FY88. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1989-01-01
This publication represents the NASA research and technology program for FY89. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1985-01-01
This publication represents the NASA research and technology program for FY 1985. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1987-01-01
This publication represents the NASA research and technology program for FY87. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
During the first half of fiscal year 1995, most activities at the Yucca Mountain Site Characterization Project were directed at implementing the Program Plan developed by the Office of Civilian Radioactive Waste Management. The Plan is designed to enable the Office to make measurable and significant progress toward key objectives over the next five years within the financial resources that can be realistically expected. Activities this period focused on the immediate goal of determining by 1998 whether Yucca Mountain, Nevada, is technically suitable as a possible site for a geologic repository for the permanent disposal of spent nuclear fuel andmore » high-level radioactive waste. Work on the Project advanced in several critical areas, including programmatic activities such as issuing the Program Plan, completing the first technical basis report to support the assessment of three 10 CFR 960 guidelines, developing the Notice of Intent for the Environmental Impact Statement, submitting the License Application Annotated Outline, and beginning a rebaselining effort to conform with the goals of the Program Plan. Scientific investigation and analysis of the site and design and construction activities to support the evaluation of the technical suitability of the site also advanced. Specific details relating to all Project activities and reports generated are presented in this report.« less
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1976-01-01
A compilation of the summary portion of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA is presented along with citations and abstracts of the RTOPs. Four indexes are included: (1) subject; (2) technical monitor; (3) responsible NASA organization; and (4) RTOP number.
Information Handling in Selected Academic Libraries of the Caribbean.
ERIC Educational Resources Information Center
Rodriguez, Ketty
1988-01-01
Describes a survey that examined the extent of library technical processes automation within academic libraries at 10 Caribbean universities. Existing conditions, steps in progress, and plans for future automation are discussed. (8 references) (CLB)
Flat-plate solar array project. Volume 8: Project analysis and integration
NASA Technical Reports Server (NTRS)
Mcguire, P.; Henry, P.
1986-01-01
Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.
Technical Data and Reports on Nitrogen Dioxide Measurements and SIP Status
EPA collects data from the states and regions on their air quality and state implementation plan (SIP) progress. This information is compiled in a database, and used to create reports, trend charts, and maps.
Technical Data and Reports on Carbon Monoxide Measurements and SIP Status
EPA collects data from the states and regions on their air quality and state implementation plan (SIP) progress. This information is compiled in a database, and used to create reports, trend charts, and maps.
Progress report on CCIR studies for guaranteeing access to the geostationary satellite orbit
NASA Astrophysics Data System (ADS)
Reinhart, E. E.
Overall responsibility for preparing a report on the technical information necessary for the World Administrative Radio Conference to be held in the spring of 1984 is vested in the Interim Working Party (IWP) 4/1. The various approaches being considered by the IWP 4/1 to guarantee orbital access are described, along with the criteria that the party has proposed for evaluating and comparing the approaches. These approaches include the following: a regional detailed long-term (10-20 years) a priori allotment plan, a periodically revised (3-5 years) regional detailed allotment plan, a regional or subregional allotment plan with guaranteed access, guaranteed access by means of multilateral coordination, and coordination procedures and technical factors that are revised periodically.
Technical Data and Reports on Sulfur Dioxide (SO2) Measurements and SIP Status
EPA collects data from the states and regions on their air quality and state implementation plan (SIP) progress. This information is compiled in a database, and used to create reports, trend charts, and maps.
The magnetohydrodynamics coal-fired flow facility
NASA Astrophysics Data System (ADS)
1995-01-01
In this quarterly technical progress report, UTSI reports on the status of a multitask contract to develop the technology for the steam bottoming portion of a MHD Steam Combined Cycle Power Plant. The report describes the facility maintenance and environmental work completed, status of completing technical reports and certain key administrative actions occurring during the quarter. With program resources at a minimum to closeout the MHD program, no further testing occurred during the quarter, but the DOE CFFF facility was maintained in a standby status with winterization, preventive maintenance and repairs accomplished as needed. Plans and preparations progressed for environmental actions needed at the site to investigate and characterize the groundwater and for removal/disposal of asbestos in the cooling tower. Work continued to progress on archiving the results of the MHD program.
10 CFR 961.11 - Text of the contract.
Code of Federal Regulations, 2014 CFR
2014-01-01
... program including information on cost projections, project plans and progress reports. 5. (a) Beginning on...-type documents or computer software (including computer programs, computer software data bases, and computer software documentation). Examples of technical data include research and engineering data...
10 CFR 961.11 - Text of the contract.
Code of Federal Regulations, 2013 CFR
2013-01-01
... program including information on cost projections, project plans and progress reports. 5. (a) Beginning on...-type documents or computer software (including computer programs, computer software data bases, and computer software documentation). Examples of technical data include research and engineering data...
Christopoulos, Georgios; Kandzari, David E; Yeh, Robert W; Jaffer, Farouc A; Karmpaliotis, Dimitri; Wyman, Michael R; Alaswad, Khaldoon; Lombardi, William; Grantham, J Aaron; Moses, Jeffrey; Christakopoulos, Georgios; Tarar, Muhammad Nauman J; Rangan, Bavana V; Lembo, Nicholas; Garcia, Santiago; Cipher, Daisha; Thompson, Craig A; Banerjee, Subhash; Brilakis, Emmanouil S
2016-01-11
This study sought to develop a novel parsimonious score for predicting technical success of chronic total occlusion (CTO) percutaneous coronary intervention (PCI) performed using the hybrid approach. Predicting technical success of CTO PCI can facilitate clinical decision making and procedural planning. We analyzed clinical and angiographic parameters from 781 CTO PCIs included in PROGRESS CTO (Prospective Global Registry for the Study of Chronic Total Occlusion Intervention) using a derivation and validation cohort (2:1 sampling ratio). Variables with strong association with technical success in multivariable analysis were assigned 1 point, and a 4-point score was developed from summing all points. The PROGRESS CTO score was subsequently compared with the J-CTO (Multicenter Chronic Total Occlusion Registry in Japan) score in the validation cohort. Technical success was 92.9%. On multivariable analysis, factors associated with technical success included proximal cap ambiguity (beta coefficient [b] = 0.88), moderate/severe tortuosity (b = 1.18), circumflex artery CTO (b = 0.99), and absence of "interventional" collaterals (b = 0.88). The resulting score demonstrated good calibration and discriminatory capacity in the derivation (Hosmer-Lemeshow chi-square = 2.633; p = 0.268, and receiver-operator characteristic [ROC] area = 0.778) and validation (Hosmer-Lemeshow chi-square = 5.333; p = 0.070, and ROC area = 0.720) subset. In the validation cohort, the PROGRESS CTO and J-CTO scores performed similarly in predicting technical success (ROC area 0.720 vs. 0.746, area under the curve difference = 0.026, 95% confidence interval = -0.093 to 0.144). The PROGRESS CTO score is a novel useful tool for estimating technical success in CTO PCI performed using the hybrid approach. Copyright © 2016 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.
Bors, Philip A; Kemner, Allison; Fulton, John; Stachecki, Jessica; Brennan, Laura K
2015-01-01
As part of Robert Wood Johnson Foundation's Healthy Kids, Healthy Communities (HKHC) national grant program, a technical assistance team designed the HKHC Community Dashboard, an online progress documentation and networking system. The Dashboard was central to HKHC's multimethod program evaluation and became a communication interface for grantees and technical assistance providers. The Dashboard was designed through an iterative process of identifying needs and priorities; designing the user experience, technical development, and usability testing; and applying visual design. The system was created with an open-source content management system and support for building an online community of users. The site developer trained technical assistance providers at the national program office and evaluators, who subsequently trained all 49 grantees. Evaluators provided support for Dashboard users and populated the site with the bulk of its uploaded tools and resource documents. The system tracked progress through an interactive work plan template, regular documentation by local staff and partners, and data coding and analysis by the evaluation team. Other features included the ability to broadcast information to Dashboard users via e-mail, event calendars, discussion forums, private messaging, a resource clearinghouse, a technical assistance diary, and real-time progress reports. The average number of Dashboard posts was 694 per grantee during the grant period. Technical assistance providers and grantees uploaded a total of 1304 resource documents. The Dashboard functions with the highest grantee satisfaction were its interfaces for sharing and progress documentation. A majority of Dashboard users (69%) indicated a preference for continued access to the Dashboard's uploaded resource documents. The Dashboard was a useful and innovative tool for participatory evaluation of a large national grant program. While progress documentation added some burden to local project staff, the system proved to be a useful resource-sharing technology.
Administrative Information Systems Plan for FY89
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-11-01
The Administrative Information Systems (AIS) Plan was developed to prioritize, track, and control the cost of AIS activities. This annually published plan, in conjunction with quarterly status reports, measures projected AIS activities and progress. The AIS Plan and quarterly reporting are administered jointly by the Director of Computing and an Organization 30 director. Priority development projects are clearly defined and closely managed efforts that consume significant resources. Directorate supplementals describe other AIS activity within each directorate, which may include: production support; technical support; development activity; and other AIS effort.
McDonald, G; Weston, N; Dorrington, B
2003-01-01
This paper reports on work in progress on the new Wet Tropics Regional Natural Resource Management Plan and its potential to deliver river management and water quality outcomes. The plan is being prepared in accordance with the guidelines of the Nation Action Plan for Salinity and Water Quality/Natural Heritage Trust (NAP/NHT2). In particular the paper discusses the technical basis for priorities, target setting and implementation and the most effective instruments for achieving river improvement and water quality outcomes in the region.
Instructional Film Research Program; Period: 1 March to 30 June 1949. Progress Report Number 11-12.
ERIC Educational Resources Information Center
Pennsylvania State Univ., University Park. Coll. of Education.
A combination of a progress report and a technical report, this paper should prove useful as an aid in planning future research, and should prove generally useful to those interested in communication processes by means of sound films, as well as to those who work in the areas of radio and television. Effectively there are two halves to the paper.…
NASA Technical Reports Server (NTRS)
1975-01-01
Summaries are presented of Research and Technology Operating Plans currently in progress throughout NASA. Citations and abstracts of the operating plans are presented along with a subject index, technical monitor index, and responsible NASA organization index. Research programs presented include those carried out in the Office of Aeronautics and Space Technology, Office of Energy Programs, Office of Applications, Office of Space Sciences, Office of Tracking and Data Acquisition, and the Office of Manned Space Flight.
Research and Technology Operating Plan Summary, Fiscal Year 1972 Research and Technology Program
NASA Technical Reports Server (NTRS)
1971-01-01
The NASA Research and Technology program for FY 1972 is presented. It is a compilation of the summary portions of each of the RTOPs (Research and Technology Operating Plan) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities.
Research and Technology Operating Plan. Summary: Fiscal year 1976 research and technology program
NASA Technical Reports Server (NTRS)
1976-01-01
A compilation of the summary portions of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA was presented. The document is arranged in five sections. The first one contains citations and abstracts of the RTOP. This is followed by four indexes: subject, technical monitor, responsible NASA organization, and RTOP number.
Technical Data and Reports on Particulate Matter (PM) Measurements and SIP Status
EPA collects data from the states and regions on their air quality, including levels of pollutants such as PM, and state implementation plan (SIP) progress. This information is compiled in a database, and used to create reports, trend charts, and maps.
Code of Federal Regulations, 2012 CFR
2012-07-01
... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...
Code of Federal Regulations, 2011 CFR
2011-07-01
... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...
Code of Federal Regulations, 2010 CFR
2010-07-01
... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...
Code of Federal Regulations, 2013 CFR
2013-07-01
... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...
Code of Federal Regulations, 2014 CFR
2014-07-01
... data or other information, submitted with an application for a research grant, or with a report, while research is in progress. (vi) Technical or scientific data developed by a contractor or subcontractor... speculative, tentative, or evaluative nature or such matters as proposed plans to procure, lease or otherwise...
ERIC Educational Resources Information Center
Texas Advisory Council for Technical - Vocational Education, Austin.
Assessment of the present status of vocational education in Texas and recommended priorities for the future constitute this annual report. Part 1 documents the progress of the 1970s and lists 15 challenges for vocational education in the 1980s, including application of meaningful evaluation procedures and careful program planning to maximize cost…
Status of the Advanced Virgo gravitational wave detector
NASA Astrophysics Data System (ADS)
Acernese, F.; Adams, T.; Agatsuma, K.; Aiello, L.; Allocca, A.; Amato, A.; Antier, S.; Arnaud, N.; Ascenzi, S.; Astone, P.; Bacon, P.; Bader, M. K. M.; Baldaccini, F.; Ballardin, G.; Barone, F.; Barsuglia, M.; Barta, D.; Basti, A.; Bawaj, M.; Bazzan, M.; Bejger, M.; Belahcene, I.; Bersanetti, D.; Bertolini, A.; Bitossi, M.; Bizouard, M. A.; Bloemen, S.; Boer, M.; Bogaert, G.; Bondu, F.; Bonnand, R.; Boom, B. A.; Boschi, V.; Bouffanais, Y.; Bozzi, A.; Bradaschia, C.; Branchesi, M.; Briant, T.; Brillet, A.; Brisson, V.; Bulik, T.; Bulten, H. J.; Buskulic, D.; Buy, C.; Cagnoli, G.; Calloni, E.; Canepa, M.; Canizares, P.; Capocasa, E.; Carbognani, F.; Casanueva Diaz, J.; Casentini, C.; Cavalier, F.; Cavalieri, R.; Cella, G.; Cerboni Baiardi, L.; Cerretani, G.; Cesarini, E.; Chassande-Mottin, E.; Chincarini, A.; Chiummo, A.; Christensen, N.; Chua, S.; Ciolfi, R.; Cirone, A.; Cleva, F.; Coccia, E.; Cohadon, P.-F.; Colla, A.; Conti, L.; Cortese, S.; Coulon, J.-P.; Cuoco, E.; D'Antonio, S.; Dattilo, V.; Davier, M.; Degallaix, J.; de Laurentis, M.; Deléglise, S.; Del Pozzo, W.; De Rosa, R.; di Fiore, L.; di Giovanni, M.; di Girolamo, T.; di Lieto, A.; di Pace, S.; di Palma, I.; di Renzo, F.; Dolique, V.; Ducrot, M.; Fafone, V.; Farinon, S.; Ferrante, I.; Ferrini, F.; Fidecaro, F.; Fiori, I.; Fiorucci, D.; Flaminio, R.; Fournier, J.-D.; Frasca, S.; Frasconi, F.; Frey, V.; Gammaitoni, L.; Garufi, F.; Gemme, G.; Genin, E.; Gennai, A.; Germain, V.; Ghosh, A.; Ghosh, S.; Giazotto, A.; Gonzalez Castro, J. M.; Gosselin, M.; Gouaty, R.; Grado, A.; Granata, M.; Greco, G.; Groot, P.; Gruning, P.; Guidi, G. M.; Harms, J.; Heidmann, A.; Heitmann, H.; Hello, P.; Hemming, G.; Hoak, D.; Hofman, D.; Huet, D.; Intini, G.; Isac, J.-M.; Jacqmin, T.; Jaranowski, P.; Jonker, R. J. G.; Kéfélian, F.; Khan, I.; Koley, S.; Kowalska, I.; Królak, A.; Kutynia, A.; Lartaux-Vollard, A.; Lazzaro, C.; Leaci, P.; Leonardi, M.; Leroy, N.; Letendre, N.; Lorenzini, M.; Loriette, V.; Losurdo, G.; Lumaca, D.; Majorana, E.; Maksimovic, I.; Man, N.; Mantovani, M.; Marchesoni, F.; Marion, F.; Martelli, F.; Martellini, L.; Masserot, A.; Mastrogiovanni, S.; Meidam, J.; Merzougui, M.; Metzdorff, R.; Mezzani, F.; Michel, C.; Milano, L.; Miller, A.; Minazzoli, O.; Minenkov, Y.; Moggi, A.; Mohan, M.; Montani, M.; Mours, B.; Nardecchia, I.; Naticchioni, L.; Nelemans, G.; Neri, M.; Nichols, D.; Nissanke, S.; Nocera, F.; Palomba, C.; Paoletti, F.; Paoli, A.; Pasqualetti, A.; Passaquieti, R.; Passuello, D.; Patricelli, B.; Pedurand, R.; Perreca, A.; Piccinni, O. J.; Pichot, M.; Piergiovanni, F.; Pillant, G.; Pinard, L.; Poggiani, R.; Popolizio, P.; Porter, E. K.; Prodi, G. A.; Punturo, M.; Puppo, P.; Rapagnani, P.; Razzano, M.; Regimbau, T.; Rei, L.; Ricci, F.; Robinet, F.; Rocchi, A.; Rolland, L.; Romano, R.; Rosińska, D.; Ruggi, P.; Salconi, L.; Sassolas, B.; Schmidt, P.; Sentenac, D.; Sequino, V.; Sieniawska, M.; Singhal, A.; Sorrentino, F.; Stratta, G.; Swinkels, B. L.; Tacca, M.; Tiwari, S.; Tonelli, M.; Travasso, F.; Tringali, M. C.; Trozzo, L.; Tsang, K. W.; van Bakel, N.; van Beuzekom, M.; van den Brand, J. F. J.; van den Broeck, C.; van der Schaaf, L.; van Heijningen, J. V.; Vardaro, M.; Vasúth, M.; Vedovato, G.; Verkindt, D.; Vetrano, F.; Viceré, A.; Vinet, J.-Y.; Vocca, H.; Walet, R.; Wang, G.; Was, M.; Yvert, M.; Zadrożny, A.; Zelenova, T.; Zendri, J.-P.
2017-10-01
Advanced Virgo is the French-Italian second generation laser gravitational wave detector, successor of the Initial Virgo. This new interferometer keeps only the infrastructure of its predecessor and aims to be ten times more sensitive, with its first science run planned for 2017. This article gives an overview of the Advanced Virgo design and the technical choices behind it. Finally, the up-to-date progresses and the planned upgrade for the following years are detailed.
The Chancellor's Biennial Report: Two Years of Progress, 1983-85.
ERIC Educational Resources Information Center
Alabama State Dept. of Postsecondary Education, Montgomery.
This report summarizes the activities and accomplishments of Alabama's community, junior, and technical college system for 1983 to 1985. Following an introduction by the chancellor, Charles L. Payne, the report highlights major achievements in the following areas: (1) strategic planning and management, covering activities related to critical…
Strategic Plan for Standards-Based Reform. Report of Progress.
ERIC Educational Resources Information Center
Hawaii State Dept. of Education, Honolulu. Office of the Superintendent.
This report summarizes the expectations, mission, guiding principles, standards, assessments, and time line for standards implementation for the state of Hawai'i. Implementation was scheduled for completion by August 2000. A technical reference matrix tracks the development of the assessment and accountability system. The completion of specific…
The 1990 progress report and future plans
NASA Technical Reports Server (NTRS)
Friedland, Peter; Zweben, Monte; Compton, Michael
1990-01-01
This document describes the progress and plans of the Artificial Intelligence Research Branch (RIA) at ARC in 1990. Activities span a range from basic scientific research to engineering development and to fielded NASA applications, particularly those applications that are enabled by basic research carried out at RIA. Work is conducted in-house and through collaborative partners in academia and industry. Our major focus is on a limited number of research themes with a dual commitment to technical excellence and proven applicability to NASA short, medium, and long-term problems. RIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at JPL and AI applications groups at all NASA centers.
Advanced light source: Compendium of user abstracts and technical reports,1993-1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
1997-04-01
This compendium contains abstracts written by users summarizing research completed or in progress from 1993-1996, ALS technical reports describing ongoing efforts related to improvement in machine operations and research and development projects, and information on ALS beamlines planned through 1998. Two tables of contents organize the user abstracts by beamline and by area of research, and an author index makes abstracts accessible by author and by principal investigator. Technical details for each beamline including whom to contact for additional information can be found in the beamline information section. Separate abstracts have been indexed into the database for contributions to thismore » compendium.« less
Emery, James; Crump, Carolyn; Hawkins, Margaret
2007-10-01
AARP conducted a 2.5-year social-marketing campaign to improve physical activity levels among older adults in Richmond, Virginia and Madison, Wisconsin. This article presents formative evaluation findings from the campaign's policy/environmental change component. Evaluation data were abstracted from technical-assistance documentation and telephone interviews. Results include 11 policy and 14 environmental changes attained or in-process by campaign closure. Differences between the cities' results are explained through differences in program implementation (e.g., types of changes planned, formalization of partnerships). Project teams took less time deciding to pursue policy change than environmental change; however, planning the policy activities took longer than planning environmental-change activities. Recommendations for future policy/environmental change interventions focus on the selection of strategies; planning for administrative resources; formalizing partnerships to ensure sustainability of impact; ensuring training and technical assistance; and documenting progress. Similar intervention results may be attainable with a multi-year timeframe, adequate part-time coordination, and committed volunteers.
Gas-turbine critical research and advanced technology support project
NASA Technical Reports Server (NTRS)
Clark, J. S.; Lowell, C. E.; Niedzwiecki, R. W.; Nainiger, J. J.
1979-01-01
The technical progress made during the first 15 months of a planned 40-month project to provide a critical-technology data base for utility gas-turbine systems capable of burning coal-derived fuels is summarized. Tasks were included in the following areas: (1) combustion, to study the combustion of coal-derived fuels and conversion of fuel-bound nitrogen to NOx; (2) materials, to understand and prevent hot corrosion; and (3) system studies, to integrate and guide the other technologies. Significant progress was made.
ERIC Educational Resources Information Center
Southern Rural Development Center, State College, MS.
Included in this second annual report on the Southern Rural Development Center's (SRDC) 1974-75 plan of work are data re: orientation visits; regional workshops; technical consultants; liaison with regional agencies and organizations; information dissemination; annual evaluation; functional networks in the areas of land use issues, citizen…
NASA STI Program Coordinating Council Eleventh Meeting: NASA STI Modernization Plan
NASA Technical Reports Server (NTRS)
1993-01-01
The theme of this NASA Scientific and Technical Information Program Coordinating Council Meeting was the modernization of the STI Program. Topics covered included the activities of the Engineering Review Board in the creation of the Infrastructure Upgrade Plan, the progress of the RECON Replacement Project, the use and status of Electronic SCAN (Selected Current Aerospace Notices), the Machine Translation Project, multimedia, electronic document interchange, the NASA Access Mechanism, computer network upgrades, and standards in the architectural effort.
48 CFR 2052.211-71 - Technical progress report.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...
48 CFR 2052.211-71 - Technical progress report.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...
48 CFR 2052.211-71 - Technical progress report.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...
48 CFR 2052.211-71 - Technical progress report.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...
2009-01-01
management. Forest and Natural Resources Management: USDA has provided technical guidance to assist MAIL in developing a pistachio forest management...plan for rehabilitating degraded pistachio woodlands. In 2006, target villages realized a 65 percent increase in income from pistachio nuts, with
Abarca, Christine; Grigg, C Meade; Steele, Jo Ann; Osgood, Laurie; Keating, Heidi
2009-01-01
COMPASS (Comprehensive Assessment, Strategic Success) is the Florida Department of Health's community health assessment and health improvement planning initiative. Since 2002, COMPASS built state and county health department infrastructure to support a comprehensive, systematic, and integrated approach to community health assessment and planning. To assess the capacity of Florida's 67 county health departments (CHDs) to conduct community health assessment and planning and to identify training and technical assistance needs, COMPASS surveyed the CHDs using a Web-based instrument annually from 2004 through 2008. Response rate to the survey was 100 percent annually. In 2007, 96 percent of CHDs reported conducting assessment and planning within the past 3 years; 74 percent used the MAPP (Mobilizing for Action through Planning and Partnerships) framework. Progress was greater for the organizational and assessment phases of the MAPP-based work; only 10 CHDs had identified strategic priorities in 2007, and even fewer had implemented strategies for improving health. In 2007, the most frequently requested types of training were measuring success, developing goals and action plans, and using qualitative data; technical assistance was most frequently requested for program evaluation and writing community health status reports. Florida's CHDs have increased their capacity to conduct community health assessment and planning. Questions remain about sustaining these gains with limited resources.
2013 Geothermal Technologies Office Peer Review Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geothermal Technologies Office
Geothermal Technologies Office conducted its annual program peer review in April of 2013. The review provided an independent, expert evaluation of the technical progress and merit of GTO-funded projects. Further, the review was a forum for feedback and recommendations on future GTO strategic planning. During the course of the peer review, DOE-funded projects were evaluated for 1) their contribution to the mission and goals of the GTO and 2) their progress against stated project objectives. Principal Investigators (PIs) came together in sessions organized by topic “tracks” to disseminate information, progress, and results to a panel of independent experts as wellmore » as attendees.« less
Wahid, Rahnuma; Holt, Renee; Hjorth, Richard; Berlanda Scorza, Francesco
2016-10-26
With the support of the Biomedical Advanced Research and Development Authority (BARDA) of the US Department of Health and Human Services, PATH has contributed to the World Health Organization's (WHO's) Global Action Plan for Influenza Vaccines (GAP) by providing technical and clinical assistance to several developing country vaccine manufacturers (DCVMs). GAP builds regionally based independent and sustainable influenza vaccine production capacity to mitigate the overall global shortage of influenza vaccines. The program also ensures adequate influenza vaccine manufacturing capacity in the event of an influenza pandemic. Since 2009, PATH has worked closely with two DCVMs in Vietnam: the Institute of Vaccines and Medical Biologicals (IVAC) and VABIOTECH. Beginning in 2013, PATH also began working with Torlak Institute in Serbia; Instituto Butantan in Brazil; Serum Institute of India Private Ltd. in India; and Changchun BCHT Biotechnology Co. (BCHT) in China. The DCVMs supported under the GAP program all had existing influenza vaccine manufacturing capability and required technical support from PATH to improve vaccine yield, process efficiency, and product formulation. PATH has provided customized technical support for the manufacturing process to each DCVM based on their respective requirements. Additionally, PATH, working with BARDA and WHO, supported several DCVMs in the clinical development of influenza vaccine candidates progressing toward national licensure or WHO prequalification. As a result of the activities outlined in this review, several companies were able to make excellent progress in developing state-of-the-art manufacturing processes and completing early phase clinical trials. Licensure trials are currently ongoing or planned for several DCVMs. Copyright © 2016 Elsevier Ltd. All rights reserved.
Chemical and biological nonproliferation program. FY99 annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2000-03-01
This document is the first of what will become an annual report documenting the progress made by the Chemical and Biological Nonproliferation Program (CBNP). It is intended to be a summary of the program's activities that will be of interest to both policy and technical audiences. This report and the annual CBNP Summer Review Meeting are important vehicles for communication with the broader chemical and biological defense and nonproliferation communities. The Chemical and Biological Nonproliferation Program Strategic Plan is also available and provides additional detail on the program's context and goals. The body of the report consists of an overviewmore » of the program's philosophy, goals and recent progress in the major program areas. In addition, an appendix is provided with more detailed project summaries that will be of interest to the technical community.« less
Programming of Urban Revitalization
NASA Astrophysics Data System (ADS)
Biliński, Tadeusz
2016-12-01
The planning stage of the investment-construction process is of a crucial importance. Its overall impact on the costs, construction time and the quality of design solutions is huge. However, in practice, little attention is given to this pre-design stage, except for public buildings or other buildings of particular importance. In consequence, the results of investment and construction activities are unsatisfactory. Therefore, the issue has been given careful consideration in this paper. The paper discusses the issue of programming urban revitalization, emphasizing its socio-economic importance. To illustrate the complexity of revitalization projects planning, the author draws attention to social, economic, technical and organisational factors, such as public participation, reorganization and revaluation of land use planning, rationalization of energy use, organization and management of revitalization processes, as well as technical progress. Summarising the paper, the author concludes that in order to improve the quality of life of town residents and to protect material national heritage, it is indispensable to continuously revitalize subsequent town areas.
NASA Technical Reports Server (NTRS)
Rienecker, Michele M.; Dee, Dick; Woollen, Jack; Compo, Gilbert P.; Onogi, Kazutoshi; Gelaro, Ron; Bosilovich, Michael G.; daSilva, Arlindo; Pawson, Steven; Schubert, Siegfried;
2012-01-01
In April 2010, developers representing each of the major reanalysis centers met at Goddard Space Flight Center to discuss technical issues - system advances and lessons learned - associated with recent and ongoing atmospheric reanalyses and plans for the future. The meeting included overviews of each center s development efforts, a discussion of the issues in observations, models and data assimilation, and, finally, identification of priorities for future directions and potential areas of collaboration. This report summarizes the deliberations and recommendations from the meeting as well as some advances since the workshop.
Technical Feasibility Aspects of the Geothermal Resource Reporting Methodology (GRRM)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Badgett, Alex; Young, Katherine R; Dobson, Patrick F.
This paper reviews the technical assessment of the Geothermal Research Reporting Methodology (GRRM, http://en.openei.org/wiki/GRRM) being developed for reporting geothermal resources and project progress. The goal of the methodology is to provide the U.S. Department of Energy's Geothermal Technologies Office (GTO) with a consistent and comprehensible means of evaluating the impacts of its funding programs. The GRRM is designed to provide uniform assessment criteria for geothermal resource grades and developmental phases of geothermal resource exploration and development. This resource grade system provides information on twelve attributes of geothermal resource locations (e.g., temperature, permeability, land access) to indicate potential for geothermal development.more » The GTO plans to use these Protocols to help quantitatively identify the greatest barriers to geothermal development, develop measureable program goals that will have the greatest impact to geothermal deployment, objectively evaluate proposals based (in part) on a project's ability to contribute to program goals, monitor project progress, and report on GTO portfolio performance. The GRRM assesses three areas of geothermal potential: geological, socio-economic, and technical. Previous work and publications have discussed the work done on the geological aspects of this methodology (Young et al. 2015c); this paper details the development of the technical assessment of the GRRM. Technical development attributes considered include: reservoir management, drilling, logistics, and power conversion.« less
Acquisition of background and technical information and class trip planning
NASA Technical Reports Server (NTRS)
Mackinnon, R. M.; Wake, W. H.
1981-01-01
Instructors who are very familiar with a study area, as well as those who are not, find the field trip information acquisition and planning process speeded and made more effective by organizing it in stages. The stage follow a deductive progression: from the associated context region, to the study area, to the specific sample window sites, and from generalized background information on the study region to specific technical data on the environmental and human use systems to be interpreted at each site. On the class trip and in the follow up laboratory, the learning/interpretive process are at first deductive in applying previously learned information and skills to analysis of the study site, then inductive in reading and interpreting the landscape, imagery, and maps of the site, correlating them with information of other samples sites and building valid generalizations about the larger study area, its context region, and other (similar and/or contrasting) regions.
Wind-turbine-performance assessment
NASA Astrophysics Data System (ADS)
Vachon, W. A.
1982-06-01
An updated summary of recent test data and experiences is reported from both federally and privately funded large wind turbine (WT) development and test programs, and from key WT programs in Europe. Progress and experiences on both the cluster of three MOD-2 2.5-MW WT's, the MOD-1 2-MW WT, and other WT installations are described. An examination of recent test experiences and plans from approximately five privately funded large WT programs in the United States indicates that, during machine checkout and startup, technical problems are identified, which require and startup, a number of technical problems are identified, which will require design changes and create program delays.
ERIC Educational Resources Information Center
Western European Education, 1977
1977-01-01
Discusses problems encountered in France in developing a labor force skilled in areas needed by industry and in coordinating the supply and demand of these skills. Conclusions are that vocational training research must be promoted on a systematic basis and that socioeconomic factors and worker attitudes must be considered in addition to technical…
NASA Technical Reports Server (NTRS)
Bonet, John T.; Schellenger, Harvey G.; Rawdon, Blaine K.; Elmer, Kevin R.; Wakayama, Sean R.; Brown, Derrell L.; Guo, Yueping
2011-01-01
NASA has set demanding goals for technology developments to meet national needs to improve fuel efficiency concurrent with improving the environment to enable air transportation growth. A figure shows NASA's subsonic transport system metrics. The results of Boeing ERA N+2 Advanced Vehicle Concept Study show that the Blended Wing Body (BWB) vehicle, with ultra high bypass propulsion systems have the potential to meet the combined NASA ERA N+2 goals. This study had 3 main activities. 1) The development of an advanced vehicle concepts that can meet the NASA system level metrics. 2) Identification of key enabling technologies and the development of technology roadmaps and maturation plans. 3) The development of a subscale test vehicle that can demonstrate and mature the key enabling technologies needed to meet the NASA system level metrics. Technology maturation plans are presented and include key performance parameters and technical performance measures. The plans describe the risks that will be reduced with technology development and the expected progression of technical maturity.
The national response for preventing healthcare-associated infections: infrastructure development.
Mendel, Peter; Siegel, Sari; Leuschner, Kristin J; Gall, Elizabeth M; Weinberg, Daniel A; Kahn, Katherine L
2014-02-01
In 2009, the US Department of Health and Human Services (HHS) launched the Action Plan to Prevent Healthcare-associated Infections (HAIs). The Action Plan adopted national targets for reduction of specific infections, making HHS accountable for change across the healthcare system over which federal agencies have limited control. This article examines the unique infrastructure developed through the Action Plan to support adoption of HAI prevention practices. Interviews of federal (n=32) and other stakeholders (n=38), reviews of agency documents and journal articles (n=260), and observations of interagency meetings (n=17) and multistakeholder conferences (n=17) over a 3-year evaluation period. We extract key progress and challenges in the development of national HAI prevention infrastructure--1 of the 4 system functions in our evaluation framework encompassing regulation, payment systems, safety culture, and dissemination and technical assistance. We then identify system properties--for example, coordination and alignment, accountability and incentives, etc.--that enabled or hindered progress within each key development. The Action Plan has developed a model of interagency coordination (including a dedicated "home" and culture of cooperation) at the federal level and infrastructure for stimulating change through the wider healthcare system (including transparency and financial incentives, support of state and regional HAI prevention capacity, changes in safety culture, and mechanisms for stakeholder engagement). Significant challenges to infrastructure development included many related to the same areas of progress. The Action Plan has built a foundation of infrastructure to expand prevention of HAIs and presents useful lessons for other large-scale improvement initiatives.
SERC 2014 2018 Technical Plan: 2016 Update
2016-02-18
Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update SERC 2014-2018 Technical Plan: 2016 Update...UNCLASSIFIED / APPROVED FOR PUBLIC RELEASE Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update ii...18, 2016 SERC 2014-2018 Technical Plan Update iii TABLE OF CONTENTS Table of Contents
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
This progress report broadly defines the scope of supplementation plans and activities in the Columbia Basin. It provides the foundation for more detailed analysis of supplementation in subsequent reports in this series. Topics included in this report are: definition of supplementation, project diversity, objectives and performance standards, uncertainties and theory. Since this is a progress report, the content is subject to modification with new information. The supplementation theory will continue to evolve throughout the duration of RASP and beyond. The other topics in this report are essentially complete and are not expected to change significantly. This is the first ofmore » a series of four reports which will summarize information contained in the larger, RASP progress and completion reports. Our goal is to make the findings of RASP more accessible by grouping related topics into smaller but complete narratives on important aspects of supplementation. We are planning to publish the following reports under the general title Supplementation in the Columbia River Basin: Part 1, Background, Description, Performance Measures, Uncertainty and Theory; Part 2, Theoretical Framework and Models; Part 3, Planning Guidelines; and Part 4, Regional Coordination of Research and Monitoring. Supplementation is expected to be a major contributor to the planned increase in salmon and steelhead production in the Columbia Basin. The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) uses three approaches to protect and enhance salmon and steelhead in the Columbia Basin: (1) enhance fish production; (2) improve passage in the mainstem rivers; and (3) revise harvest management to support the rebuilding of fish runs (NPPC 1987). The fish production segment calls for a three-part approach focused on natural production, hatchery production, and supplementation. Supplementation is planned to provide over half of the total production increases. The Regional Assessment of Supplementation Project (RASP) was initiated as a result of a request by NPPC to address long-standing concerns about the need to coordinate supplementation research, monitoring and evaluation. Such coordination was also recommended by the Supplementation Technical Work Group. In August 1990, the NPPC gave conditional approval to proceed with the final design of the Yakima Production Project. The Council called on the Bonneville Power Administration (BPA) to fund immediately a supplementation assessment to reevaluate, prioritize and coordinate all existing and planned supplementation monitoring and evaluation activities in the basin. Providing for the participation of the fishery agencies and tribes and others having expertise in this area. RASP addresses four principal objectives: (1) provide an overview of ongoing and planned supplementation activities and identify critical uncertainties associated with supplementation, (2) construct a conceptual framework and model which estimates the potential benefits and risks of supplementation and prioritizes uncertainties, (3) provide guidelines for the development of supplementation projects, (4) develop a plan for regional coordination of research and monitoring. These objectives, once attained, will provide the technical tools fishery managers need to carry out the Council's direction to protect and enhance salmon and steelhead. RASP has further divided the four broad objectives into 12 technical topics: (1) definition of supplementation; (2) description of the diversity of supplementation projects; (3) objectives and performance standards; (4) identification of uncertainties; (5) supplementation theory; (6) development of a conceptual model of supplemented populations; (7) development of spreadsheet model of risks and benefits of supplementation; (8) classification of stocks, streams, and supplementation strategies; (9) regional design of supplementation evaluation and monitoring; (10) guidelines for planning supplementation projects (11) application of the spreadsheet model to supplementation planning; and (12) experimental design and decision making with uncertainty.« less
Status of the US RERTR Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Travelli, A.
1995-02-01
The progress of the Reduced Enrichment Research and Test Reactor (RERTR) Program is described. The major events, findings, and activities of 1994 are reviewed after a brief summary of the results which the RERTR Program had achieved by the end of 1993 in collaboration with its many international partners. The RERTR Program has moved aggressively to support President Clinton`s nonproliferation policy and his goal {open_quotes}to minimize the use of highly-enriched uranium in civil nuclear programs{close_quotes}. An Environmental Assessment which addresses the urgent-relief acceptance of 409 spent fuel elements was completed, and the first shipment of spent fuel elements is scheduledmore » for this month. An Environmental Impact Statement addressing the acceptance of spent research reactor fuel containing enriched uranium of U.S. origin is scheduled for completion by the end of June 1995. The U.S. administration has decided to resume development of high-density LEU research reactor fuels. DOE funding and guidance are expected to begin soon. A preliminary plan for the resumption of fuel development has been prepared and is ready for implementation. The scope and main technical activities of a plan to develop and demonstrate within the next five years the technical means needed to convert Russian-supplied research reactors to LEU fuels was agreed upon by the RERTR Program and four Russian institutes lead by RDIPE. Both Secretary O`Leary and Minister Michailov have expressed strong support for this initiative. Joint studies have made significant progress, especially in assessing the technical and economic feasibility of using reduced enrichment fuels in the SAFARI-I reactor in South Africa and in the Advanced Neutron Source reactor under design at ORNL. Significant progress was achieved on several aspects of producing {sup 99}Mo from fission targets utilizing LEU instead of HEU to the achievement of the common goal.« less
[Progress and prospect of bio-jet fuels industry in domestic and overseas].
Qiao, Kai; Fu, Jie; Zhou, Feng; Ma, Huixia
2016-10-25
We reviewed the progress of the bio-jet fuels industry in recent years and systematically analyzed the technical routes that have been approved or in the pipeline for approval by ASTM D7566. In addition, we highlighted a novel pathway to produce drop-in fuel by near-critical hydrolysis of waste cooking oils or algal oils followed by catalytic decarboxylation. Also, we introduced the source of oils and fats feedstock and the domestic bio-jet fuel industry status during the 12th Five-Year-Plan period. Based on our own research, we discussed the prospect of the bio-jet fuel industry and future research needs.
[Training program design of acupuncture and moxibustion manipulation techniques].
Dong, Qin
2009-12-01
As an important component of acupuncture-moxibustion science, needling and moxibustion is one methodology and technology and its technical characteristics determine its special status and role in training programs. It is closely ralated to meridians-collaterals-acupoints and acupuncture treatment. Therefore, it demands an overall planning for acupuncture professional skills that consists of meridians-collaterals-acupoints knowledge and acupuncture treatment techniques. The practical training courses are the step by step progress involving repeated practices.
Advanced Gas Turbine (AGT) Technology Development Project
NASA Technical Reports Server (NTRS)
1987-01-01
This report is the eleventh in the series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Standard Oil Company, and AiResearch Casting Company. This report covers plans and progress for the period July 1, 1985 through June 30, 1986. Technical progress during the reported period was highlighted by the 85-hour endurance run of an all-ceramic engine operating in the 2000 to 2250 F temperature regime. Component development continued in the areas of the combustion/fuel injection system, regenerator and seals system, and ceramic turbine rotor attachment design. Component rig testing saw further refinements. Ceramic materials showed continued improvements in required properties for gas turbine applications; however, continued development is needed before performance and reliability goals can be set.
Automated Array Assembly, Phase 2
NASA Technical Reports Server (NTRS)
Daiello, R. V.
1978-01-01
The purpose of the overall program is to establish technological readiness and provide verification for the elements of a manufacturing sequence which would ultimately be suitable for the large-scale production of silicon solar-array modules at a selling price of less than $500/kW. A program and process plan for accomplishing this objective was developed and put into operation. Three junction-formation processes are shown; since cost analysis shows that they do not differ greatly in cost, each should be considered for technical merits and possible future cost reduction. The progress made in the various process steps of the plan is described, and conclusions are presented.
Decarbonizing the international shipping industry: Solutions and policy recommendations.
Wan, Zheng; El Makhloufi, Abdel; Chen, Yang; Tang, Jiayuan
2018-01-01
Ship-source greenhouse gas (GHG) emissions could increase by up to 250% by 2050 from their 2012 levels, owing to increasing global freight volumes. Binding international legal agreements to regulate GHGs, however, are lacking as technical solutions remain expensive, and crucial industrial support is absent. In 2003, the International Maritime Organization adopted Resolution A.963 (23) to regulate shipping CO 2 emissions via technical, operational, and market-based routes. However, progress has been slow and uncertain; there is no concrete emission reduction target or definitive action plan. Yet, a full-fledged roadmap may not even emerge until 2023. In this policy analysis, we revisit the progress of technical, operational, and market-based routes and the associated controversies. We argue that 1) a performance-based index, though good-intentioned, has loopholes affecting meaningful CO 2 emission reductions driven by technical advancements; 2) using slow steaming to cut energy consumption stands out among all operational solutions thanks to its immediate and obvious results, but with the already slow speed in practice, this single source has limited emission reduction potential; 3) without a technology-savvy shipping industry, a market-based approach is essentially needed to address the environmental impact. To give shipping a 50:50 chance for contributing fairly and proportionately to keep global warming below 2°C, deep emission reductions should occur soon. Copyright © 2017 Elsevier Ltd. All rights reserved.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
The status of beryllium technology for fusion
NASA Astrophysics Data System (ADS)
Scaffidi-Argentina, F.; Longhurst, G. R.; Shestakov, V.; Kawamura, H.
2000-12-01
Beryllium was used for a number of years in the Joint European Torus (JET), and it is planned to be used extensively on the lower heat-flux surfaces of the reduced technical objective/reduced cost international thermonuclear experimental reactor (RTO/RC ITER). It has been included in various forms in a number of tritium breeding blanket designs. There are technical advantages but also a number of safety issues associated with the use of beryllium. Research in a variety of technical areas in recent years has revealed interesting issues concerning the use of beryllium in fusion. Progress in this research has been presented at a series of International Workshops on Beryllium Technology for Fusion. The most recent workshop was held in Karlsruhe, Germany on 15-17 September 1999. In this paper, a summary of findings presented there and their implications for the use of beryllium in the development of fusion reactors are presented.
Applications of numerical optimization methods to helicopter design problems: A survey
NASA Technical Reports Server (NTRS)
Miura, H.
1984-01-01
A survey of applications of mathematical programming methods is used to improve the design of helicopters and their components. Applications of multivariable search techniques in the finite dimensional space are considered. Five categories of helicopter design problems are considered: (1) conceptual and preliminary design, (2) rotor-system design, (3) airframe structures design, (4) control system design, and (5) flight trajectory planning. Key technical progress in numerical optimization methods relevant to rotorcraft applications are summarized.
Applications of numerical optimization methods to helicopter design problems - A survey
NASA Technical Reports Server (NTRS)
Miura, H.
1985-01-01
A survey of applications of mathematical programming methods is used to improve the design of helicopters and their components. Applications of multivariable search techniques in the finite dimensional space are considered. Five categories of helicopter design problems are considered: (1) conceptual and preliminary design, (2) rotor-system design, (3) airframe structures design, (4) control system design, and (5) flight trajectory planning. Key technical progress in numerical optimization methods relevant to rotorcraft applications are summarized.
Applications of numerical optimization methods to helicopter design problems - A survey
NASA Technical Reports Server (NTRS)
Miura, H.
1984-01-01
A survey of applications of mathematical programming methods is used to improve the design of helicopters and their components. Applications of multivariable search techniques in the finite dimensional space are considered. Five categories of helicopter design problems are considered: (1) conceptual and preliminary design, (2) rotor-system design, (3) airframe structures design, (4) control system design, and (5) flight trajectory planning. Key technical progress in numerical optimization methods relevant to rotorcraft applications are summarized.
[Plan to improve malaria control towards its elimination in Mesoamerica].
Rodríguez, Mario Henry; Betanzos-Reyes, Angel Francisco
2011-01-01
To develop a plan to strengthen the control of malaria towards its elimination. In 2009, under the coordination of the National Public HealthInstitute ofMexico, atransdisciplinary equipment of technical and operative experts was conformed to carry out a situational analysis of malaria and control programs and for the selection of effective practices of intervention that would be incorporated to the plan, within the framework of an exercise in Theory of Change. Criteria for thestratificationof thelocalities, based ontheirtransmission characteristics were established. The structural and operative limitations of the control programs were identified. A plan of interventions was elaborated to improve the coverage of epidemiological surveillance, anti-malaria interventions and opportune diagnosis and treatment of cases. The plan delineates progressive phases of implementation: reorganization, intensification of interventions and evaluation of elimination feasibility. The adoption of a regional strategic plan will provide guidance and administrative elements to conform a system that coordinates the activities of the national control programs and facilitate the elimination of malaria in the region.
Site characterization report for the basalt waste isolation project. Volume II
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1982-11-01
The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987,more » and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 2 contains chapters 6 through 12: geochemistry; surface hydrology; climatology, meteorology, and air quality; environmental, land-use, and socioeconomic characteristics; repository design; waste package; and performance assessment.« less
48 CFR 742.1170-4 - Progress reporting requirements and contract clause.
Code of Federal Regulations, 2010 CFR
2010-10-01
... progress. (b) Because the cognizant technical officer is the individual most familiar with the contractor's performance, the contractor must submit the progress reports directly to the cognizant technical officer. The cognizant technical officer must review the reports and advise the contracting officer, in writing, of any...
Education, Technical Progress, and Economic Growth: The Case of Taiwan.
ERIC Educational Resources Information Center
Lin, T.-C.
2003-01-01
Investigates the effect of education and the role of technical progress on economic growth in Taiwan from 1965-2000. Finds that education has a positive and significant effect on growth, but the role of technical progress does not appear to be extraordinarily important. Furthermore, no markedly significant relationships exist between capital and…
Status and progress of the RERTR program in the year 2002.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Travelli, A.; Technology Development
2003-01-01
Following the cancellation of the 2001 International RERTR Meeting, which had been planned to occur in Bali, Indonesia, this paper describes the progress achieved by the Reduced Enrichment for Research and Test Reactors (RERTR) Program in collaboration with its many international partners during the years 2001 and 2002, and discusses the main activities planned for the year 2003. The past two years have been characterized by very important achievements of the RERTR program, but these technical achievements have been overshadowed by the terrible events of September 11, 2001. Those events have caused the U.S. Government to reevaluate the importance andmore » urgency of the RERTR program goals. A recommendation made at the highest levels of the government calls for an immediate acceleration of the program activities, with the goal of converting all the world's research reactors to low-enriched fuel at the earliest possible time, and including both Soviet-designed and United States-designed research reactors.« less
Technical Steps to Support Nuclear Arsenal Downsizing: A Report by the APS Panel on Public Affairs
2010-02-01
play a critical role in advancing the US plan to balance deter- rence with downsizing the US nuclear arsenal. In particular, S&T are essential to enable...nuclear-armed nations must be assured that they will continue to be able to meet those critical security needs. While individual nuclear-armed...steps are essential to progress towards the eventual elimination of nuclear arsenals. Science and technology (S&T) will play a critical role in
ERIC Educational Resources Information Center
Marlowe, Edward; And Others
This is the fourth report in a series which describes the results and progress in a long-term program to develop a Data Management System (DMS) and a Student Management System (SMS) for use in the Naval Student Pilot Training System. The DMS will contain all of the student naval aviator's data files needed to support an improved student training…
Supersonic Post-Combustion Inertial CO 2 Extraction System Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Balepin, Vladimir
This report summarizes the effort carried out under NETL contract DE- FE0013122 from 1 October 2013 to 31 March 2017. As described in this document, technical challenges realized during the performance of this project resulted in completion of only the first two of three planned budget periods. Despite this outcome, substantial progress was made toward understanding and maturing the CO 2 capture technology under consideration and considerable future promise remains for applications requiring lower CO 2 capture and/or lower CO 2.
Webinar May 17: Fuel Cell Electric Bus Progress Toward Meeting Technical
Targets | News | NREL Webinar May 17: Fuel Cell Electric Bus Progress toward Meeting Technical Targets Webinar May 17: Fuel Cell Electric Bus Progress toward Meeting Technical Targets May 14, 2018 The U.S. Department of Energy's (DOE's) Fuel Cell Technologies Office will present a live webinar titled
Preparation for an online asynchronous university doctoral course. Lessons learned.
Milstead, J A; Nelson, R
1998-01-01
This article addresses the development of the initial course in the first completely online doctoral program in nursing. Synchronous and asynchronous methods of distance education were assessed. Planning focused at the university, school, and course levels. University planning involved the technical infrastructure, registration, student services, and library services. School planning examined administrative commitment and faculty commitment and willingness. Course planning focused on marketing, precourse information, time frame, modular design, planned interaction, and professor availability and support. Implementation issues centered on getting students connected, learning the software, changing instructional methods, and managing chats. Traditional methods of evaluating student learning and course evaluation were supplemented with the development of qualitative and quantitative tools to gather data for making administrative decisions. The Dean and faculty agreed that the internet was an effective method of delivering content in the initial Health Policy course. The Dean and faculty agreed to continue the PhD program online for one cohort and continue to evaluate student progress and faculty and student satisfaction.
Omondi Aduda, Dickens S; Ouma, Collins; Onyango, Rosebella; Onyango, Mathews; Bertrand, Jane
2015-01-01
Voluntary medical male circumcision (VMMC) service delivery is complex and resource-intensive. In Kenya's context there is still paucity of information on resource use vis-à-vis outputs as programs scale up. Knowledge of technical efficiency, productivity and potential sources of constraints is desirable to improve decision-making. To evaluate technical efficiency and productivity of VMMC service delivery in Nyanza in 2011/2012 using data envelopment analysis. Comparative process evaluation of facilities providing VMMC in Nyanza in 2011/2012 using output orientated data envelopment analysis. Twenty one facilities were evaluated. Only 1 of 7 variables considered (total elapsed operation time) significantly improved from 32.8 minutes (SD 8.8) in 2011 to 30 minutes (SD 6.6) in 2012 (95%CI = 0.0350-5.2488; p = 0.047). Mean scale technical efficiency significantly improved from 91% (SD 19.8) in 2011 to 99% (SD 4.0) in 2012 particularly among outreach compared to fixed service delivery facilities (CI -31.47959-4.698508; p = 0.005). Increase in mean VRS technical efficiency from 84% (SD 25.3) in 2011 and 89% (SD 25.1) in 2012 was not statistically significant. Benchmark facilities were #119 and #125 in 2011 and #103 in 2012. Malmquist Productivity Index (MPI) at fixed facilities declined by 2.5% but gained by 4.9% at outreach ones by 2012. Total factor productivity improved by 83% (p = 0.032) in 2012, largely due to progress in technological efficiency by 79% (p = 0.008). Significant improvement in scale technical efficiency among outreach facilities in 2012 was attributable to accelerated activities. However, ongoing pure technical inefficiency requires concerted attention. Technological progress was the key driver of service productivity growth in Nyanza. Incorporating service-quality dimensions and using stepwise-multiple criteria in performance evaluation enhances comprehensiveness and validity. These findings highlight site-level resource use and sources of variations in VMMC service productivity, which are important for program planning.
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
25 CFR 30.111 - When should the tribal governing body or school board request technical assistance?
Code of Federal Regulations, 2011 CFR
2011-04-01
... request technical assistance? 30.111 Section 30.111 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION ADEQUATE YEARLY PROGRESS Defining Adequate Yearly Progress Technical Assistance § 30.111 When should the tribal governing body or school board request technical assistance? In order to...
Flat-plate solar array progress and plans
NASA Technical Reports Server (NTRS)
Callaghan, W. T.; Henry, P. K.
1984-01-01
The Flat-Plate Solar Array Project (FSA), sponsored by the U.S. Department of Energy (DOE) and managed by the Jet Propulsion Laboratory (JPL), has achieved progress in a broad range of technical activities since that reported at the Fourth European Communities Conference. A particularly important analysis has been completed recently which confirms the adoption into practice by the U.S. Photovoltaic (PV Industry, of all the low-cost module technology elements proposed at the 16th Project Integration Meeting for a $2.80/Wp (1980 U.S. Dollars) design approach in the fall of 1980. This work presents along with a projection, using the same techniques, for what is believed to be a very credible ribbon-based module design for less that $0.55/Wp (1980 U.S. Dollars). Other areas to be reported upon include low-cost Si feedstock refinement; ribbon growth; process sequence development for cells; environmental isolation; engineering science investigations; and module testing progress.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-31
The National Center for Improving Science Education has undertaken activities to achieve evaluation goals for DOE`s Precollege programs: develop means to determine program quality; develop means for determining the contribution of DOE precollege programs to both teacher enhancement and student achievement; provide evaluation designs and instruments and reports of program quality and impact; and strengthen both DOE`s and the Labs` capacity to do both short- and long-term planning as well as deliver effective programs and evaluation. Appendices include evaluation/technical assistance report, profiling teacher research participation and teacher development programs, teacher surveys, impact assessment design, and teacher research participation programs anecdotesmore » for 8 labs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The Library Services Alliance is a unique multi-type library consortium committed to resource sharing. As a voluntary association of university and governmental laboratory libraries supporting scientific research, the Alliance has become a leader in New Mexico in using cooperative ventures to cost-effectively expand resources supporting their scientific and technical communities. During 1994, the alliance continued to expand on their strategic planning foundation to enhance access to research information for the scientific and technical communities. Significant progress was made in facilitating easy access to the on-line catalogs of member libraries via connections through the Internet. Access to Alliance resources is nowmore » available via the World Wide Web and Gopher, as well as links to other databases and electronic information. This report highlights the accomplishments of the Alliance during calendar year 1994.« less
de Oliveira, Lucia Helena; Trumbo, Silas Pierson; Ruiz Matus, Cuauhtémoc; Sanwogou, N Jennifer; Toscano, Cristiana M
2016-10-01
In Latin America and the Caribbean, pneumococcus has been estimated to cause 12,000-28,000 deaths, 182,000 hospitalizations, and 1.4 million clinic visits annually. Countries in the Americas have been among the first developing nations to introduce pneumococcal conjugate vaccines into their Expanded Programs on Immunization, with 34 countries and territories having introduced these vaccines as of September 2015. Lessons learned for successful vaccine introduction include the importance of coordination between political and technical decision makers, adjustments to the cold chain prior to vaccine introduction, and the need for detailed plans addressing the financial and technical sustainability of introduction. Though many questions on the Pneumococcal Conjugate Vaccine remain unanswered, the experience of the Americas suggests that the vaccines can be introduced quickly and effectively.
NASA Astrophysics Data System (ADS)
Samson, Philippe
2005-05-01
The constant evolution of the satellite market is asking for better technical performances and reliability for a reduced cost. Solar array is in front line of this challenge.This can be achieved by present technologies progressive improvement in cost reduction or by technological breakthrough.To reach an effective End Of Live performance100 W/kg of solar array is not so easy, even if you suppose that the mass of everything is nothing!Thin film cells are potential candidate to contribute to this challenge with certain confidence level and consequent development plan validation and qualification on ground and flight.Based on a strong flight heritage in flexible Solar Array design, the work has allowed in these last years, to pave the way on road map of thin film technologies . This is encouraged by ESA on many technological contracts put in concurrent engineering.CISG was selected cell and their strategy of design, contributions and results will be presented.Trade-off results and Design to Cost solutions will discussed.Main technical drivers, system design constraints, market access, key technologies needed will be detailed in this paper and the resulting road-map and development plan will be presented.
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
Vanetti, Eugenio; Nicolini, Giorgia; Nord, Janne; Peltola, Jarkko; Clivio, Alessandro; Fogliata, Antonella; Cozzi, Luca
2011-11-01
The RapidArc volumetric modulated arc therapy (VMAT) planning process is based on a core engine, the so-called progressive resolution optimizer (PRO). This is the optimization algorithm used to determine the combination of field shapes, segment weights (with dose rate and gantry speed variations), which best approximate the desired dose distribution in the inverse planning problem. A study was performed to assess the behavior of two versions of PRO. These two versions mostly differ in the way continuous variables describing the modulated arc are sampled into discrete control points, in the planning efficiency and in the presence of some new features. The analysis aimed to assess (i) plan quality, (ii) technical delivery aspects, (iii) agreement between delivery and calculations, and (iv) planning efficiency of the two versions. RapidArc plans were generated for four groups of patients (five patients each): anal canal, advanced lung, head and neck, and multiple brain metastases and were designed to test different levels of planning complexity and anatomical features. Plans from optimization with PRO2 (first generation of RapidArc optimizer) were compared against PRO3 (second generation of the algorithm). Additional plans were optimized with PRO3 using new features: the jaw tracking, the intermediate dose and the air cavity correction options. Results showed that (i) plan quality was generally improved with PRO3 and, although not for all parameters, some of the scored indices showed a macroscopic improvement with PRO3. (ii) PRO3 optimization leads to simpler patterns of the dynamic parameters particularly for dose rate. (iii) No differences were observed between the two algorithms in terms of pretreatment quality assurance measurements and (iv) PRO3 optimization was generally faster, with a time reduction of a factor approximately 3.5 with respect to PRO2. These results indicate that PRO3 is either clinically beneficial or neutral in terms of dosimetric quality while it showed significant advantages in speed and technical aspects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lunis, B. C.; Toth, W. J.
The activities and findings of the seven state commercialization teams participating in the Rocky Mountain Basin and Range commercialization program are described. Background information is provided; program objectives and the technical approach that is used are discussed; and the benefits of the program are described. The summary of findings is presented. Prospect identification, area development plans, site specific development analyses, time-phased project plans, the aggregated prospective geothermal energy use, and institutional analyses are discussed. Public outreach activities are covered and findings and recommendations are summarized. The commercialization activities carried out by the respective state teams are described for the following:more » Colorado, Montana, New Mexico, North Dakota, South Dakota, Utah, and Wyoming.« less
Code of Federal Regulations, 2011 CFR
2011-04-01
..., DEPARTMENT OF THE INTERIOR EDUCATION ADEQUATE YEARLY PROGRESS Defining Adequate Yearly Progress Technical Assistance § 30.110 What is the process for requesting technical assistance to develop an alternative... 25 Indians 1 2011-04-01 2011-04-01 false What is the process for requesting technical assistance...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false What is the process for requesting technical assistance..., DEPARTMENT OF THE INTERIOR EDUCATION ADEQUATE YEARLY PROGRESS Defining Adequate Yearly Progress Technical Assistance § 30.110 What is the process for requesting technical assistance to develop an alternative...
Latkovich, V.J.; Tracey, Debra C.
1994-01-01
The Hydrologic lnstrumentation Facility (HIF) of the U.S. Geological Survey (USGS) has nationwide responsibility for all aspects of hydrologic field instrumentation in support of Survey data-collection programs. Each year the HIF publishes a report to inform Water Resources Division (WRD) personnel of progress made by the HIF in fulfilling its mission to improve instrumentation services to the Division. The report for fiscal year 1993 (FY93) describes the activities of the HIF, including major accomplish- ments for the year; personnel actions; active projects (reported by section--Technical Services Section, Administrative Services Section, Field Coordination, Applications and Development Section, Test and Evaluation Section, Field Service and Supply Section); and planned activities for the coming year. Also presented in the appendixes are detailed listings of the memberships of the Instrumentation Committee and the Instrumentation Technical Advisory Subcommittee; district, sub- district, and field office visits by HIF personnel; professional and technical meetings attended by HIF personnel; vendor visits; and reports prepared by HIF personnel.
Progress in Norwegian-Russian Regulatory Cooperation in Management of the Nuclear Legacy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sneve, M.K.; Shandala, N.K.; Smith, G.M.
2008-07-01
The Norwegian Radiation Protection Authority (NRPA) and the Federal Medical-Biological Agency (FMBA) of the Russian Federation have a collaboration programme which forms part of the Norwegian government's Plan of Action to improve radiation and nuclear safety in northwest Russia. The background to the NRPA-FMBA collaboration programme has been described in previous WM presentations. This paper presents the substantial progress made within that programme, describes ongoing progress within specific projects and sets out the value arising from wider involvement in the programme of other organisations such as NATO and the technical support derived from other national agencies such as the IAEA,more » and regulatory authorities from the USA, the UK and France. The main activities of the cooperation projects are concerned with the management of the nuclear legacy in northwest Russia, in particular the remediation of facilities, and related spent fuel and radioactive waste management, at the former Shore Technical Bases at Andreeva Bay and Gremikha Village. New regulatory guidance documents have been developed, necessary because of the special abnormal situation at these sites, now designated as Sites of Temporary Storage (STS), but also because of the transition from military to civilian regulatory supervision and the evolving regulatory system in the Russian Federation. The work has involved major technical inputs from the Russian Federation Institute of Biophysics, as well as review and advice on international recommendations and good practice in other countries provided by other technical support organisations. Projects on-going in 2007 are described which involve regulatory guidance on very Low-Level Waste management, specifically for the licensing and operation of new VLLW disposal facilities; optimisation of operational radiation protection, particularly in areas of high ambient radiation dose rate as are found in some parts of the STSs; determination of factors which can be used to identify when to apply emergency procedures before the full emergency is obvious; and development of the radio-ecological basis for identifying radiation supervision area boundaries. (authors)« less
Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alleman, Glen B.; Nosbisch, Michael R.
2012-07-01
DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shapiro, S.C.; Woolf, B.
The Northeast Artificial Intelligence Consortium (NAIC) was created by the Air Force Systems Command, Rome Air Development Center, and the Office of Scientific Research. Its purpose is to conduct pertinent research in artificial intelligence and to perform activities ancillary to this research. This report describes progress that has been made in the fourth year of the existence of the NAIC on the technical research tasks undertaken at the member universities. The topics covered in general are: versatile expert system for equipment maintenance, distributed AI for communications system control, automatic photointerpretation, time-oriented problem solving, speech understanding systems, knowledge base maintenance, hardwaremore » architectures for very large systems, knowledge-based reasoning and planning, and a knowledge acquisition, assistance, and explanation system. The specific topic for this volume is the recognition of plans expressed in natural language, followed by their discussion and use.« less
14 CFR 1274.701 - Suspension or termination.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agreement if the recipient is not making anticipated technical progress, if the recipient materially changes...) Similarly, the recipient may terminate the agreement if, for example, technical progress is not being made, if the commercial recipient shifts its technical emphasis, or if other technological advances have...
14 CFR 1274.701 - Suspension or termination.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Agreement if the recipient is not making anticipated technical progress, if the recipient materially changes...) Similarly, the recipient may terminate the agreement if, for example, technical progress is not being made, if the commercial recipient shifts its technical emphasis, or if other technological advances have...
Middle Atmosphere Program. Handbook for MAP, volume 28
NASA Technical Reports Server (NTRS)
Liu, C. H. (Editor); Edwards, Belva (Editor)
1989-01-01
Extended abstracts from the fourth workshop on the technical and scientific aspects of MST (mesosphere stratosphere troposphere) radar are presented. Individual sessions addressed the following topics: meteorological applications of MST and ST radars, networks, and campaigns; dynamics of the equatorial middle atmosphere; interpretation of radar returns from clear air; techniques for studying gravity waves and turbulence; intercomparison and calibration of wind and wave measurements at various frequencies; progress in existing and planned MST and ST radars; hardware design for MST and ST radars and boundary layer/lower troposphere profilers; signal processing; and data management.
NASA Technical Reports Server (NTRS)
1979-01-01
An environmentally oriented microwave technology exploratory research program aimed at reducing the uncertainty associated with microwave power system critical technical issues is described. Topics discussed include: (1) Solar Power Satellite System (SPS) development plan elements; (2) critical technology issues related to the SPS preliminary reference configuration; (3) pilot plant to demonstrate commercial viability of the SPS system; and (4) research areas required to demonstrate feasibility of the SPS system. Progress in the development of advanced GaAs solar cells is reported along with a power distribution subsystem.
Intelligent hypertext systems for aerospace engineering applications
NASA Technical Reports Server (NTRS)
Lo, Ching F.
1989-01-01
This paper is a progress report on the utilization of AI technology for assisting users locating and understanding technical information in manuals used for planning and conducting wind tunnel test. The specific goal is to create an Intelligent Hypertext System (IHS) for wind tunnel testing which combines the computerized manual in the form of hypertext and an advisory system that stores experts' knowledge and experiences. A prototype IHS for conducting transonic wind tunnel testing has been constructed with limited knowledge base. The prototype is being evaluated by potential users.
Engineering Technical Review Planning Briefing
NASA Technical Reports Server (NTRS)
Gardner, Terrie
2012-01-01
The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.
Space and Earth Sciences, Computer Systems, and Scientific Data Analysis Support, Volume 1
NASA Technical Reports Server (NTRS)
Estes, Ronald H. (Editor)
1993-01-01
This Final Progress Report covers the specific technical activities of Hughes STX Corporation for the last contract triannual period of 1 June through 30 Sep. 1993, in support of assigned task activities at Goddard Space Flight Center (GSFC). It also provides a brief summary of work throughout the contract period of performance on each active task. Technical activity is presented in Volume 1, while financial and level-of-effort data is presented in Volume 2. Technical support was provided to all Division and Laboratories of Goddard's Space Sciences and Earth Sciences Directorates. Types of support include: scientific programming, systems programming, computer management, mission planning, scientific investigation, data analysis, data processing, data base creation and maintenance, instrumentation development, and management services. Mission and instruments supported include: ROSAT, Astro-D, BBXRT, XTE, AXAF, GRO, COBE, WIND, UIT, SMM, STIS, HEIDI, DE, URAP, CRRES, Voyagers, ISEE, San Marco, LAGEOS, TOPEX/Poseidon, Pioneer-Venus, Galileo, Cassini, Nimbus-7/TOMS, Meteor-3/TOMS, FIFE, BOREAS, TRMM, AVHRR, and Landsat. Accomplishments include: development of computing programs for mission science and data analysis, supercomputer applications support, computer network support, computational upgrades for data archival and analysis centers, end-to-end management for mission data flow, scientific modeling and results in the fields of space and Earth physics, planning and design of GSFC VO DAAC and VO IMS, fabrication, assembly, and testing of mission instrumentation, and design of mission operations center.
2011-12-01
systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical
Progress in Scientific and Technical Communications, 1968 Annual Report.
ERIC Educational Resources Information Center
Federal Council for Science and Technology, Washington, DC. Committee on Scientific and Technical Information.
This sixth annual report describes progress achieved by the Federal Government in improving the communication of scientific and technical information to support and enhance national science and technology. Included in the report are details regarding the scientific and technical activities of individual Federal Agencies, such as the Atomic Energy…
48 CFR 2452.242-71 - Contract management system.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., concise summary of technical progress made and the costs incurred for each task during the reporting... technical progress made for each task during the reporting period; and (B) Identifies problems, or potential... and progress reporting as described herein. (b) The contract management system shall consist of two...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1958-10-31
The progress and trends of research are presented along with a description of operational, service, end administrative activities. Some scientific and technical details are given on research programs in the physical sciences, life sciences, and engineering, however, more complete technical information is available in quarterly progress reports, BNL technical reports, and scientific and technical periodicals. A bibliography of these publications is appended. (For preceding period see BNL-426.) (D.E.B.)
Technical Assistance Plan (TAP)
A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.
20 CFR 411.180 - What is timely progress toward self-supporting employment?
Code of Federal Regulations, 2010 CFR
2010-04-01
... certificate or vocational or technical training that will enhance your ability to return to work. In addition...-secondary education requirement or vocational or technical training requirement in the applicable progress... this 12-month period; or (iv) You must have been enrolled in a vocational or technical training program...
Harris, Jody; Nguyen, Phuong H.; To, Quyen; Frongillo, Edward A.; Menon, Purnima
2016-01-01
Vietnam has been decentralizing nutrition planning to provinces, which could help with local relevance and accountability. Assessment in 2009 found a continuing top-down approach, limited human capacity, and difficulty in integrating multiple sectors. Alive and Thrive (A&T) provided targeted assistance and capacity-building for 15 provincial plans for nutrition (PPNs). We aimed to (i) assess PPN content and quality improvements 2009–2014, and (ii) explain processes through which change occurred. Data consisted of interview-based assessments of provincial planning processes, annual PPN assessments, and tracking of A&T involvement. At endline, some provinces produced higher quality plans. Local planning skills improved, but capacity remained insufficient. Awareness of and support for nutrition improved, but some policy and legal environments were contradictory. Objectives were clearer, but use of data for planning remained inconsistent. Provinces became more proactive and creative, but remained constrained by slow approval processes and insufficient funding. Targeted assistance and local advocacy can improve decentralized planning, with success dependent on policy and programming contexts and ability to overcome constraints around capacity, investment, data use and remnants of centralized planning. We recommend strong engagement with planners at the national level to understand how to unblock major constraints; solutions must take into consideration the particular political, financial and administrative context. PMID:27198978
Resource Planning Model | Energy Analysis | NREL
balancing authority. An image of a overlapping circles labelled Resource, Technical, Economic, and Market competing electricity technologies. An image of a overlapping circles labelled Resource, Technical, Economic ; Federal Resource Planning. Volume 1: Sectoral, Technical, and Economic Trends, NREL Technical Report (2016
Omondi Aduda, Dickens S.; Ouma, Collins; Onyango, Rosebella; Onyango, Mathews; Bertrand, Jane
2015-01-01
Background Voluntary medical male circumcision (VMMC) service delivery is complex and resource-intensive. In Kenya’s context there is still paucity of information on resource use vis-à-vis outputs as programs scale up. Knowledge of technical efficiency, productivity and potential sources of constraints is desirable to improve decision-making. Objective To evaluate technical efficiency and productivity of VMMC service delivery in Nyanza in 2011/2012 using data envelopment analysis. Design Comparative process evaluation of facilities providing VMMC in Nyanza in 2011/2012 using output orientated data envelopment analysis. Results Twenty one facilities were evaluated. Only 1 of 7 variables considered (total elapsed operation time) significantly improved from 32.8 minutes (SD 8.8) in 2011 to 30 minutes (SD 6.6) in 2012 (95%CI = 0.0350–5.2488; p = 0.047). Mean scale technical efficiency significantly improved from 91% (SD 19.8) in 2011 to 99% (SD 4.0) in 2012 particularly among outreach compared to fixed service delivery facilities (CI -31.47959–4.698508; p = 0.005). Increase in mean VRS technical efficiency from 84% (SD 25.3) in 2011 and 89% (SD 25.1) in 2012 was not statistically significant. Benchmark facilities were #119 and #125 in 2011 and #103 in 2012. Malmquist Productivity Index (MPI) at fixed facilities declined by 2.5% but gained by 4.9% at outreach ones by 2012. Total factor productivity improved by 83% (p = 0.032) in 2012, largely due to progress in technological efficiency by 79% (p = 0.008). Conclusions Significant improvement in scale technical efficiency among outreach facilities in 2012 was attributable to accelerated activities. However, ongoing pure technical inefficiency requires concerted attention. Technological progress was the key driver of service productivity growth in Nyanza. Incorporating service-quality dimensions and using stepwise-multiple criteria in performance evaluation enhances comprehensiveness and validity. These findings highlight site-level resource use and sources of variations in VMMC service productivity, which are important for program planning. PMID:25706119
Methodology for Planning Technical Education: With a Case Study of Polytechnics in Bangladesh.
ERIC Educational Resources Information Center
Ritzen, Jozef M.; Balderston, Judith B.
A product of research first begun by one of the authors in Bangladesh, this book develops a comprehensive set of methods for planning technical education. Wherever possible, the authors draw on existing tools, fitting them to the specific context of technical education. When faced with planning problems for which existing methods are ill suited…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-14
... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference To Discuss Increasing Market and Planning Efficiency Through Improved Software May 7, 2010. Take notice that Commission... planning efficiency through improved software. [[Page 27342
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brady, M; Browand, F; Flowers, D
A Working Group Meeting on Heavy Vehicle Aerodynamic Drag was held at University of Southern California, Los Angeles, California on July 30, 1999. The purpose of the meeting was to present technical details on the experimental and computational plans and approaches and provide an update on progress in obtaining experimental results, model developments, and simulations. The focus of the meeting was a review of University of Southern California's (USC) experimental plans and results and the computational results from Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories (SNL) for the integrated tractor-trailer benchmark geometry called the Sandia Model. Much ofmore » the meeting discussion involved the NASA Ames 7 ft x 10 ft wind tunnel tests and the need for documentation of the results. The present and projected budget and funding situation was also discussed. Presentations were given by representatives from the Department of Energy (DOE) Office of Transportation Technology Office of Heavy Vehicle Technology (OHVT), LLNL, SNL, USC, and California Institute of Technology (Caltech). This report contains the technical presentations (viewgraphs) delivered at the Meeting, briefly summarizes the comments and conclusions, and outlines the future action items.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bill Stanley; Patrick Gonzalez; Sandra Brown
2006-06-30
The Nature Conservancy is participating in a Cooperative Agreement with the Department of Energy (DOE) National Energy Technology Laboratory (NETL) to explore the compatibility of carbon sequestration in terrestrial ecosystems and the conservation of biodiversity. The title of the research project is ''Application and Development of Appropriate Tools and Technologies for Cost-Effective Carbon Sequestration''. The objectives of the project are to: (1) improve carbon offset estimates produced in both the planning and implementation phases of projects; (2) build valid and standardized approaches to estimate project carbon benefits at a reasonable cost; and (3) lay the groundwork for implementing cost-effective projects,more » providing new testing ground for biodiversity protection and restoration projects that store additional atmospheric carbon. This Technical Progress Report discusses preliminary results of the six specific tasks that The Nature Conservancy is undertaking to answer research needs while facilitating the development of real projects with measurable greenhouse gas reductions. The research described in this report occurred between April 1st and July 30th 2006. The specific tasks discussed include: Task 1: carbon inventory advancements; Task 2: emerging technologies for remote sensing of terrestrial carbon; Task 3: baseline method development; Task 4: third-party technical advisory panel meetings; Task 5: new project feasibility studies; and Task 6: development of new project software screening tool. Work is being carried out in Brazil, Belize, Chile, Peru and the USA.« less
Townsend, Julie S.; Moore, Angela R.; Mulder, Tiffani N.; Boyd, Mary
2015-01-01
Context The National Comprehensive Cancer Control Program (NCCCP) performance measurement system seeks to understand both the processes that funded programs undertake with their respective coalitions to implement the objectives of their cancer plans and outcomes of those efforts. Objective To identify areas of achievement and technical assistance needs of NCCCP awardees. Design Program performance was assessed through surveys completed by program directors on performance indicators in 2009 and 2010 and queries from a web-based management information system in 2011 and 2012. Setting Programs funded by CDC’s NCCCP. Participants 69 programs. Main Outcome Measure(s) The key performance measures assessed were: inclusion of diverse partners and key sectors in cancer coalitions; partners’ involvement in activities; receiving in-kind resources from partners; using evidence-based interventions and data for setting priorities; conducting program evaluation; using community- or organization-level strategies to address cancer control efforts; and demonstrating progress toward achieving health outcomes. Results Most programs reported having active coalitions that represent diverse organizational sectors. Nearly all programs routinely assess the burden of cancer. In-kind resources to implement activities peaked at $64,716 in the second year of a five year funding cycle, and declined in subsequent project years. By year 3, over 70% of programs reported having an evaluation plan. While programs reported that nearly two-thirds of their interventions were evidence-based, some programs implemented non-evidence-based interventions. A majority of programs successfully used at least one community- or organization-level change strategy. However, many programs did not incorporate objectives linked to health outcomes as they reported progress in implementing interventions. Conclusions: While NCCCP programs were strong at building and maintaining infrastructure, some programs may need additional technical assistance to increase the adoption of evidence-based interventions, develop solid and responsive evaluation plans, and better link efforts to population-based measures that demonstrate impact toward reducing the burden of cancer. PMID:25136936
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...
ERIC Educational Resources Information Center
Minnesota State Board for Vocational Education, St. Paul.
In March 1982, the Minnesota Division of Vocational-Technical Education received requests from State legislators to develop an action plan to address the problems of declining enrollments and resources. In response to this request, a plan was developed whereby area vocational-technical institutes (AVTIs) in the State would (1) promote a process…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
...] Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum (Astragalus... availability of the technical agency draft recovery plan for Pyne's ground-plum (Astragalus bibullatus), a...: Background We listed Pyne's ground-plum as an endangered species under the Act (16 U.S.C. 1531 et seq.), on...
Cell module and fuel conditioner development
NASA Technical Reports Server (NTRS)
Hoover, D. Q., Jr.
1981-01-01
The design features and plans for fabrication of Stacks 564 and 800 are described. The results of the OS/IES loop testing of Stack 562, endurance testing of Stack 560 and the post test analysis of Stack 561 are reported. Progress on construction and modification of the fuel cell test facilities and the 10 kW reformer test station is described. Efforts to develop the technical data base for the fuel conditioning system included vendor contacts, packed bed heat transfer tests, development of the BOLTAR computer program, and work on the detailed design of the 10 kW reformer are described.
Earned Value Management (EVM) Implementation Handbook
NASA Technical Reports Server (NTRS)
2013-01-01
The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.
On the Development of Fuel-Free Power Supply Sources on Pneumatic Energy Conversion Principles
NASA Astrophysics Data System (ADS)
Son, E. E.; Nikolaev, V. G.; Kudryashov, Yu. I.; Nikolaev, V. V.
2017-12-01
The article is devoted to the evaluation of capabilities and problems of creation of fuel-free power supply of isolated and autonomous Russian consumers of low (up to several hundreds kW) power based on the joint use of wind power plants and progressive systems of pneumatic accumulation and conversion of energy. The basic and functional schemes and component structure of the system prototype are developed and proposed, the evaluations of the expected technical and economic indicators of system are presented, and the ways of its further practical implementation are planned.
Advanced Gas Turbine (AGT) Technology Development Project annual report
NASA Technical Reports Server (NTRS)
1986-01-01
This report is the tenth in a series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Carborundum Company, and AiResearch Casting Company. The Project is administered by Mr. Thomas N. Strom, Project Manager, NASA-Lewis Research Center, Cleveland, Ohio. This report covers plans and progress for the period July 1, 1984 through June 30, 1985.
Earned Value Management (EVM) Implementation Handbook
NASA Technical Reports Server (NTRS)
Terrell, Stefanie M.; Richards, Brad W.
2018-01-01
The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.
Some observations on Chinese education
NASA Technical Reports Server (NTRS)
Spearman, M. L.
1986-01-01
China has encountered many ups and downs in the field of education over the years. Although hampered by financial and personnel problems, impressive progress has been made in primary education since 1949, particularly in urban areas. The total education system is still weak, however, with a serious shortage of qualified teachers, school buildings, and other necessary facilities. Some of the problems involved are discussed. Current efforts aimed at increasing the level of compulsory education are outlined and observations are made on the status and plans relative to basic education, technical and vocational education, teacher training, resource requirements, enrollment trends, and so on.
The changing demographic, legal, and technological contexts of political representation.
Forest, Benjamin
2005-10-25
Three developments have created challenges for political representation in the U.S. and particularly for the use of territorially based representation (election by district). First, the demographic complexity of the U.S. population has grown both in absolute terms and in terms of residential patterns. Second, legal developments since the 1960s have recognized an increasing number of groups as eligible for voting rights protection. Third, the growing technical capacities of computer technology, particularly Geographic Information Systems, have allowed political parties and other organizations to create election districts with increasingly precise political and demographic characteristics. Scholars have made considerable progress in measuring and evaluating the racial and partisan biases of districting plans, and some states have tried to use Geographic Information Systems technology to produce more representative districts. However, case studies of Texas and Arizona illustrate that such analytic and technical advances have not overcome the basic contradictions that underlie the American system of territorial political representation.
Maintaining technical excellence requires a national plan
NASA Technical Reports Server (NTRS)
Davidson, T. F.
1991-01-01
To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Iverson, C.H.; Coury, G.E.
1979-01-01
Progress to date in the development of a study of the application of the technologies of mechanical vapor recompression and falling film evaporators as applied to the beet sugar industry is reported. Progress is reported in the following areas: technical literature search and plant visitations of existing applications of VR/FFE.
INDOT Technical Training Plan : Appendix B
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix M
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix P
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix F
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix H
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix E
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix O
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix J
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix L
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix A
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix D
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix K
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix G
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix I
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix N
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix C
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
ERIC Educational Resources Information Center
Yu, Zuguang; Zeng, Zida
Since the early 1990s, China's government has followed a socialist market economy system. Accordingly, the technical and vocational education (TVE) should be restructured to meet its needs. Reform of the TVE system has four aspects. First, reform of the planning system includes a move from a central plan of enrollment to planning according to…
25 CFR 30.109 - Will the Secretary provide assistance in developing an alternative AYP definition?
Code of Federal Regulations, 2011 CFR
2011-04-01
... EDUCATION ADEQUATE YEARLY PROGRESS Defining Adequate Yearly Progress Technical Assistance § 30.109 Will the... Bureau, shall provide technical assistance either directly or through contract to the tribal governing...
25 CFR 30.109 - Will the Secretary provide assistance in developing an alternative AYP definition?
Code of Federal Regulations, 2010 CFR
2010-04-01
... EDUCATION ADEQUATE YEARLY PROGRESS Defining Adequate Yearly Progress Technical Assistance § 30.109 Will the... Bureau, shall provide technical assistance either directly or through contract to the tribal governing...
research, analysis, and technical assistance on municipal energy planning and policy, utility-scale Baseline Analysis of Municipal Codification across the U.S., NREL Technical Report (2016) Navajo Generating Station & Federal Resource Planning - Volume 1: Sectoral, Technical, and Economic Trends, NREL
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
ERIC Educational Resources Information Center
System Development Corp., Santa Monica, CA.
A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ulm, Franz-Josef
2000-03-31
OAK-B135 Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 3(NOTE: Part II A item 1 indicates ''PAPER'', but a report is attached electronically)
Crosscutting Technology Development at the Center for Advanced Separation Technologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Christopher E. Hull
2006-09-30
This Technical Progress Report describes progress made on the twenty nine subprojects awarded in the second year of Cooperative Agreement DE-FC26-02NT41607: Crosscutting Technology Development at the Center for Advanced Separation Technologies. This work is summarized in the body of the main report: the individual sub-project Technical Progress Reports are attached as Appendices.
CROSSCUTTING TECHNOLOGY DEVELOPMENT AT THE CENTER FOR ADVANCED SEPARATION TECHNOLOGIES
DOE Office of Scientific and Technical Information (OSTI.GOV)
Christopher E. Hull
2006-05-15
This Technical Progress Report describes progress made on the twenty nine subprojects awarded in the second year of Cooperative Agreement DE-FC26-02NT41607: Crosscutting Technology Development at the Center for Advanced Separation Technologies. This work is summarized in the body of the main report: the individual sub-project Technical Progress Reports are attached as Appendices.
ERIC Educational Resources Information Center
Park, Bitnara Jasmine; Alonzo, Julie; Tindal, Gerald
2011-01-01
This technical report describes the process of development and piloting of reading comprehension measures that are appropriate for seventh-grade students as part of an online progress screening and monitoring assessment system, http://easycbm.com. Each measure consists of an original fictional story of approximately 1,600 to 1,900 words with 20…
Planning as an Iterative Process
NASA Technical Reports Server (NTRS)
Smith, David E.
2012-01-01
Activity planning for missions such as the Mars Exploration Rover mission presents many technical challenges, including oversubscription, consideration of time, concurrency, resources, preferences, and uncertainty. These challenges have all been addressed by the research community to varying degrees, but significant technical hurdles still remain. In addition, the integration of these capabilities into a single planning engine remains largely unaddressed. However, I argue that there is a deeper set of issues that needs to be considered namely the integration of planning into an iterative process that begins before the goals, objectives, and preferences are fully defined. This introduces a number of technical challenges for planning, including the ability to more naturally specify and utilize constraints on the planning process, the ability to generate multiple qualitatively different plans, and the ability to provide deep explanation of plans.
Presentation Of Comparative Data for Transportation Planning Studies
DOT National Transportation Integrated Search
1997-01-01
Clear, yet detailed, presentations of transportation planning data to lay groups as well as to technical groups is becoming more and more of a necessity in the planning process. Presentation of technical information in understandable terms has become...
7 CFR 4284.621 - Eligible grant purposes.
Code of Federal Regulations, 2011 CFR
2011-01-01
... by providing technical assistance for business development and economic development planning. Grant...-county economic development planning; (5) Establish centers for training, technology, and trade that will... professional services necessary to conduct the technical assistance, training, or planning functions. (b...
New Directions for High School Career and Technical Education in Wyoming: A Strategic Plan
ERIC Educational Resources Information Center
Hoachlander, Gary; Klein, Steven; Studier, Carol
2007-01-01
This report offers a plan for improving career and technical education (CTE) in Wyoming, but it is about more than just technical education. Realizing the potential of CTE to contribute to students' mastery of both academic and technical knowledge depends not only on strengthening the CTE curriculum, but also on embedding CTE in a larger program…
ERIC Educational Resources Information Center
Klose, Traugott
Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…
ERIC Educational Resources Information Center
Colombo Plan Bureau (Sri Lanka).
Focusing on the last in a series of seven seminars conducted by the Colombo Plan Bureau between 1969 and 1975 on the theme, "National Planning of Vocational and Technical Training," this report presents the proceedings of a seminar on the vocational education and training needs of one of the Colombo Plan members, Bhutan. Five working…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hammer, D.A.; Kusse, B.R.; Sudan, R.N.
1983-07-01
The progress on this contract is described in three parts. The first deals with the technical operation of the LION accelerator. The second and third parts are concerned with the experimental results.
Harris, Jody; Nguyen, Phuong H; To, Quyen; Frongillo, Edward A; Menon, Purnima
2016-12-01
Vietnam has been decentralizing nutrition planning to provinces, which could help with local relevance and accountability. Assessment in 2009 found a continuing top-down approach, limited human capacity, and difficulty in integrating multiple sectors. Alive and Thrive (A&T) provided targeted assistance and capacity-building for 15 provincial plans for nutrition (PPNs). We aimed to (i) assess PPN content and quality improvements 2009-2014, and (ii) explain processes through which change occurred. Data consisted of interview-based assessments of provincial planning processes, annual PPN assessments, and tracking of A&T involvement. At endline, some provinces produced higher quality plans. Local planning skills improved, but capacity remained insufficient. Awareness of and support for nutrition improved, but some policy and legal environments were contradictory. Objectives were clearer, but use of data for planning remained inconsistent. Provinces became more proactive and creative, but remained constrained by slow approval processes and insufficient funding. Targeted assistance and local advocacy can improve decentralized planning, with success dependent on policy and programming contexts and ability to overcome constraints around capacity, investment, data use and remnants of centralized planning. We recommend strong engagement with planners at the national level to understand how to unblock major constraints; solutions must take into consideration the particular political, financial and administrative context. © The Author 2016. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine.
EarthCube - A Community-led, Interdisciplinary Collaboration for Geoscience Cyberinfrastructure
NASA Astrophysics Data System (ADS)
Allison, M. L.; Keane, C. M.; Robinson, E.
2015-12-01
The EarthCube Test Enterprise Governance Project completed its initial two-year long process to engage the community and test a demonstration governing organization with the goal of facilitating a community-led process on designing and developing a geoscience cyberinfrastructure. Conclusions are that EarthCube is viable, has engaged a broad spectrum of end-users and contributors, and has begun to foster a sense of urgency around the importance of open and shared data. Levels of trust among participants are growing. At the same time, the active participants in EarthCube represent a very small sub-set of the larger population of geoscientists. Results from Stage I of this project have impacted NSF decisions on the direction of the EarthCube program. The overall tone of EarthCube events has had a constructive, problem-solving orientation. The technical and organizational elements of EarthCube are poised to support a functional infrastructure for the geosciences community. The process for establishing shared technological standards has notable progress but there is a continuing need to expand technological and cultural alignment. Increasing emphasis is being given to the interdependencies among EarthCube funded projects. The newly developed EarthCube Technology Plan highlights important progress in this area by five working groups focusing on: 1. Use cases; 2. Funded project gap analysis; 3. Testbed development; 4. Standards; and 5. Architecture. There is ample justification to continue running a community-led governance framework that facilitates agreement on a system architecture, guides EarthCube activities, and plays an increasing role in making the EarthCube vision of cyberinfrastructure for the geosciences operational. There is widespread community expectation for support of a multiyear EarthCube governing effort to put into practice the science, technical, and organizational plans that have and are continuing to emerge.
Development of an Updated Strategic Marketing Plan for Fox Valley Technical College.
ERIC Educational Resources Information Center
May, Susan A.
This project was conducted to develop a comprehensive strategic marketing plan for Fox Valley Technical College (FVTC). Components included a review of the literature, establishing criteria for the plan, validation of the criteria, the actual development of the plan involving a formative committee, and the review of institutional marketing plans…
1991-02-01
to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as
ERIC Educational Resources Information Center
Alonzo, Julie; Tindal, Gerald
2009-01-01
In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in kindergarten. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2008 and administered to approximately 2800 students from…
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less
Environmental Hazards Assessment Program. Quarterly report, July--September 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This report describes activities and reports on progress for the first quarter (July--September) of the fourth year of the grant to support the Environmental Hazards Assessment Program (EHAP) at the Medical University of South Carolina. It reports progress against the grant objectives and the Program Implementation Plan published at the end of the first year of the grant. The objectives of EHAP stated in the proposal to DOE are to: (1) develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; (2)more » develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and (3) identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health-oriented aspects of environmental restoration and waste management.« less
Towards a Future Linear Collider and The Linear Collider Studies at CERN
Heuer, Rolf-Dieter
2018-06-15
During the week 18-22 October, more than 400 physicists will meet at CERN and in the CICG (International Conference Centre Geneva) to review the global progress towards a future linear collider. The 2010 International Workshop on Linear Colliders will study the physics, detectors and accelerator complex of a linear collider covering both the CLIC and ILC options. Among the topics presented and discussed will be the progress towards the CLIC Conceptual Design Report in 2011, the ILC Technical Design Report in 2012, physics and detector studies linked to these reports, and an increasing numbers of common working group activities. The seminar will give an overview of these topics and also CERNâs linear collider studies, focusing on current activities and initial plans for the period 2011-16. n.b: The Council Chamber is also reserved for this colloquium with a live transmission from the Main Auditorium.
Shale Gas Exploration and Development Progress in China and the Way Forward
NASA Astrophysics Data System (ADS)
Chen, Jianghua
2018-02-01
Shale gas exploration in China started late but is progressing very quickly with the strong support from Central Government. China has 21.8 tcm technically recoverable shale gas resources and 764.3 bcm proved shale gas reserve, mainly in marine facies in Sichuan basin. In 2016, overall shale gas production in China is around 7.9 bcm, while it is set to reach 10 bcm in 2017 and 30 bcm in 2020. BP is the only remaining IOC actor in shale gas exploration in China partnering with CNPC in 2 blocks in Sichuan basin. China is encouraging shale gas business both at Central level and at Provincial level through establishing development plan, continuation of subsidies and research funding. Engineering services for shale gas development and infrastructures are developing, while the overall cost and gas marketing conditions will be key factors for the success in shale gas industry.
Towards a Future Linear Collider and The Linear Collider Studies at CERN
Stapnes, Steinar
2017-12-18
During the week 18-22 October, more than 400 physicists will meet at CERN and in the CICG (International Conference Centre Geneva) to review the global progress towards a future linear collider. The 2010 International Workshop on Linear Colliders will study the physics, detectors and accelerator complex of a linear collider covering both the CLIC and ILC options. Among the topics presented and discussed will be the progress towards the CLIC Conceptual Design Report in 2011, the ILC Technical Design Report in 2012, physics and detector studies linked to these reports, and an increasing numbers of common working group activities. The seminar will give an overview of these topics and also CERNâs linear collider studies, focusing on current activities and initial plans for the period 2011-16. n.b: The Council Chamber is also reserved for this colloquium with a live transmission from the Main Auditorium.
Health Sector Evolution Plan in Iran; Equity and Sustainability Concerns.
Moradi-Lakeh, Maziar; Vosoogh-Moghaddam, Abbas
2015-08-31
In 2014, a series of reforms, called as the Health Sector Evolution Plan (HSEP), was launched in the health system of Iran in a stepwise process. HSEP was mainly based on the fifth 5-year health development national strategies (2011-2016). It included different interventions to: increase population coverage of basic health insurance, increase quality of care in the Ministry of Health and Medical Education (MoHME) affiliated hospitals, reduce out-of-pocket (OOP) payments for inpatient services, increase quality of primary healthcare, launch updated relative value units (RVUs) of clinical services, and update tariffs to more realistic values. The reforms resulted in extensive social reaction and different professional feedback. The official monitoring program shows general public satisfaction. However, there are some concerns for sustainability of the programs and equity of financing. Securing financial sources and fairness of the financial contribution to the new programs are the main concerns of policy-makers. Healthcare providers' concerns (as powerful and influential stakeholders) potentially threat the sustainability and efficiency of HSEP. Previous experiences on extending health insurance coverage show that they can lead to a regressive healthcare financing and threat financial equity. To secure financial sources and to increase fairness, the contributions of people to new interventions should be progressive by their income and wealth. A specific progressive tax would be the best source, however, since it is not immediately feasible, a stepwise increase in the progressivity of financing must be followed. Technical concerns of healthcare providers (such as nonplausible RVUs for specific procedures or nonefficient insurance-provider processes) should be addressed through proper revision(s) while nontechnical concerns (which are derived from conflicting interests) must be responded through clarification and providing transparent information. The requirements of HSEP and especially the key element of progressive tax should be considered properly in the coming sixth national development plan (2016-2021). © 2015 by Kerman University of Medical Sciences.
Health Sector Evolution Plan in Iran; Equity and Sustainability Concerns
Moradi-Lakeh, Maziar; Vosoogh-Moghaddam, Abbas
2015-01-01
In 2014, a series of reforms, called as the Health Sector Evolution Plan (HSEP), was launched in the health system of Iran in a stepwise process. HSEP was mainly based on the fifth 5-year health development national strategies (2011-2016). It included different interventions to: increase population coverage of basic health insurance, increase quality of care in the Ministry of Health and Medical Education (MoHME) affiliated hospitals, reduce out-of-pocket (OOP) payments for inpatient services, increase quality of primary healthcare, launch updated relative value units (RVUs) of clinical services, and update tariffs to more realistic values. The reforms resulted in extensive social reaction and different professional feedback. The official monitoring program shows general public satisfaction. However, there are some concerns for sustainability of the programs and equity of financing. Securing financial sources and fairness of the financial contribution to the new programs are the main concerns of policy-makers. Healthcare providers’ concerns (as powerful and influential stakeholders) potentially threat the sustainability and efficiency of HSEP. Previous experiences on extending health insurance coverage show that they can lead to a regressive healthcare financing and threat financial equity. To secure financial sources and to increase fairness, the contributions of people to new interventions should be progressive by their income and wealth. A specific progressive tax would be the best source, however, since it is not immediately feasible, a stepwise increase in the progressivity of financing must be followed. Technical concerns of healthcare providers (such as nonplausible RVUs for specific procedures or nonefficient insurance-provider processes) should be addressed through proper revision(s) while nontechnical concerns (which are derived from conflicting interests) must be responded through clarification and providing transparent information. The requirements of HSEP and especially the key element of progressive tax should be considered properly in the coming sixth national development plan (2016-2021). PMID:26673172
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-12
... modeling demonstration should include supporting technical analyses and descriptions of all relevant....5 and NO X . The attainment demonstration includes: Technical analyses that locate, identify, and... modeling analysis is a complex technical evaluation that began with selection of the modeling system. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... the timeframe provided in the statute. It must also include supporting technical analyses and... emissions inventory (EI), a woodstove air pollution control calculation, and a technical analysis showing... year (2010); and (2) an attainment demonstration consisting of: (a) Technical analyses that locate...
Safety Standards Plan for Middlesex County Vocational & Technical High Schools.
ERIC Educational Resources Information Center
Sommer, Cy
This vocational education safety standards plan outlines rules and regulations adopted by the Board of Education of Middlesex County Vocational and Technical High Schools. The first of eleven chapters presents demographics and a safety organization table for Middlesex County Vocational and Technical Schools. In chapter 2, six safety program…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
...: Application for Technical Assistance for Community Planning and Development (CPD) Programs. OMB Approval... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5480-N-71] Notice of Submission of Proposed Information Collection to OMB; Application for Technical Assistance for Community Planning and...
Pellissippi State Technical Community College Five-Year Strategic Planning Directions, 1998-2003.
ERIC Educational Resources Information Center
Pellissippi State Technical Community Coll., Knoxville, TN.
The document contains the strategic plan for Pellissippi State Technical Community College (Tennessee). The previous five-year strategic plan, "The Pathfinder Project," was prepared in 1994 but was out of date before the end of the five-year planning cycle. To secure information for projecting new five-year strategic directions and goals…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-01
... Market and Planning Efficiency Through Improved Software; Notice of Agenda and Procedures for Staff... planning models and software. The technical conference will be held from 8 a.m. to 5:30 p.m. (EDT) on June.... Agenda for AD10-12 Staff Technical Conference on Planning Models and Software Federal Energy Regulatory...
Assessment Program Technical Progress Report, 1996-1997.
ERIC Educational Resources Information Center
McCown, Laurie; Fanning, Erin; Eickmeyer, Barbara
Coconino Community College (CCC) annually assesses its institutional effectiveness to demonstrate its commitment to improving programs and services to students. The 1996-97 Assessment Program Technical Progress Report records the assessment and institutional activities enacted during the academic year, detailing the assessment model, timelines,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
Luo, Chewe; Hirnschall, Gottfried; Rodrigues, Jessica; Romano, Sostena; Essajee, Shaffiq; Rogers, Braeden; McCarthy, Elizabeth; Mwango, Albert; Sangrujee, Nalinee; Adler, Michelle R; Houston, James C; Langa, Judite O; Urso, Marilena; Bolu, Omotayo; Tene, Gilbert; Elat Nfetam, Jean B; Kembou, Etienne; Phelps, Benjamin R
2017-05-01
While the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children (IATT) partnership existed before the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), its reconfiguration was critical to coordinating provision of technical assistance that positively influenced country decision-making and program performance. This article describes how the Global Plan anchored the work of the IATT and, in turn, how the IATT's technical assistance helped to accelerate achievement of the Global Plan targets and milestones. The technical assistance that will be discussed addressed a broad range of priority actions and milestones described in the Global Plan: (1) planning for and implementing Option B+; (2) strengthening monitoring and evaluation systems; (3) translating evidence into action and advocacy; and (4) promoting community engagement. This article also reviews the ongoing challenges and opportunities of providing technical assistance in a rapidly evolving environment that calls for ever more flexible and contextualized responses. The effectiveness of technical assistance facilitated by the IATT was defined by its timeliness, evidence base, and unique global perspective that built on the competencies of its partners and promoted synergies across program areas. Reaching the final goal of eliminating vertical transmission of HIV infection and achieving an AIDS-free generation in countries with the highest HIV burden requires that the IATT partnership and technical assistance remain responsive to country-specific needs while aligning with the current programmatic reality and new global goals such as the Sustainable Development Goals and 90-90-90 targets.
40 CFR 52.2038 - Rate of Progress Plans: Ozone.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Rate of Progress Plans: Ozone. 52.2038... Progress Plans: Ozone. (a) EPA grants full approval to Pennsylvania's 15 Percent Rate of Progress Plan for the Pittsburgh-Beaver Valley ozone nonattainment area, submitted by the Secretary of the Pennsylvania...
40 CFR 52.2038 - Rate of Progress Plans: Ozone.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Rate of Progress Plans: Ozone. 52.2038... Progress Plans: Ozone. (a) EPA grants full approval to Pennsylvania's 15 Percent Rate of Progress Plan for the Pittsburgh-Beaver Valley ozone nonattainment area, submitted by the Secretary of the Pennsylvania...
40 CFR 52.2038 - Rate of Progress Plans: Ozone.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Rate of Progress Plans: Ozone. 52.2038... Progress Plans: Ozone. (a) EPA grants full approval to Pennsylvania's 15 Percent Rate of Progress Plan for the Pittsburgh-Beaver Valley ozone nonattainment area, submitted by the Secretary of the Pennsylvania...
40 CFR 52.2038 - Rate of Progress Plans: Ozone.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Rate of Progress Plans: Ozone. 52.2038... Progress Plans: Ozone. (a) EPA grants full approval to Pennsylvania's 15 Percent Rate of Progress Plan for the Pittsburgh-Beaver Valley ozone nonattainment area, submitted by the Secretary of the Pennsylvania...
40 CFR 52.2038 - Rate of Progress Plans: Ozone.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Rate of Progress Plans: Ozone. 52.2038... Progress Plans: Ozone. (a) EPA grants full approval to Pennsylvania's 15 Percent Rate of Progress Plan for the Pittsburgh-Beaver Valley ozone nonattainment area, submitted by the Secretary of the Pennsylvania...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-06-01
Following a planning period during which the Lawrence Livermore Laboratory and the Department of Defense managing sponsor, the USAF Materials Laboratory, agreed on work statements, the Department of Defense Tri-Service Precision Machine-Tool Program began in February 1978. Milestones scheduled for the first quarter have been met. Tasks and manpower requirements for two basic projects, precision-machining commercialization (PMC) and a machine-tool task force (MTTF), were defined. Progress by PMC includes: (1) documentation of existing precision machine-tool technology by initiation and compilation of a bibliography containing several hundred entries: (2) identification of the problems and needs of precision turning-machine builders and ofmore » precision turning-machine users interested in developing high-precision machining capability; and (3) organization of the schedule and content of the first seminar, to be held in October 1978, which will bring together representatives from the machine-tool and optics communities to address the problems and begin the process of high-precision machining commercialization. Progress by MTTF includes: (1) planning for the organization of a team effort of approximately 60 to 80 international experts to contribute in various ways to project objectives, namely, to summarize state-of-the-art cutting-machine-tool technology and to identify areas where future R and D should prove technically and economically profitable; (2) preparation of a comprehensive plan to achieve those objectives; and (3) preliminary arrangements for a plenary session, also in October, when the task force will meet to formalize the details for implementing the plan.« less
ERIC Educational Resources Information Center
Alonzo, Julie; Tindal, Gerald
2009-01-01
In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grade 1. These measures, available as part of easyCBM [TM], an online progress monitoring assessment system, were developed in 2008 and administered to approximately 2800 students from schools…
ERIC Educational Resources Information Center
Alonzo, Julie; Lai, Cheng Fei; Tindal, Gerald
2009-01-01
In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…
ERIC Educational Resources Information Center
Alonzo, Julie; Lai, Cheng Fei; Tindal, Gerald
2009-01-01
In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…
ERIC Educational Resources Information Center
Lai, Cheng Fei; Alonzo, Julie; Tindal, Gerald
2009-01-01
In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…
ERIC Educational Resources Information Center
Alonzo, Julie; Lai, Cheng Fei; Tindal, Gerald
2009-01-01
In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…
ERIC Educational Resources Information Center
Lai, Cheng Fei; Alonzo, Julie; Tindal, Gerald
2009-01-01
In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…
ERIC Educational Resources Information Center
Lai, Cheng Fei; Alonzo, Julie; Tindal, Gerald
2009-01-01
In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…
NASA Technical Reports Server (NTRS)
Lichtenberg, Christopher L. (Editor)
1987-01-01
The purpose of this project was research and development of an automobile collision avoidance radar system. Items within the scope of the one-year effort were to: (1) review previous authors' work in this field; (2) select a suitable radar approach; (3) develop a system design; (4) perform basic analyses and observations pertinent to radar design, performance, and effects; (5) fabricate and collect radar data from a data collection radar; (6) analyze and derive conclusions from the radar data; and (7) make recommendations about the likelihood of success of the investigated radar techniques. The final technical report presenting all conclusions is contained in Volume 1.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Media tour the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, they received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon- Carbon and vehicle instrumentation. Later, reporters toured the OPF to see work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
2004-07-23
KENNEDY SPACE CENTER, FLA. - Media tour the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, they received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. Later, reporters toured the OPF to see work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
Producing Satisfactory Solutions to Scheduling Problems: An Iterative Constraint Relaxation Approach
NASA Technical Reports Server (NTRS)
Chien, S.; Gratch, J.
1994-01-01
One drawback to using constraint-propagation in planning and scheduling systems is that when a problem has an unsatisfiable set of constraints such algorithms typically only show that no solution exists. While, technically correct, in practical situations, it is desirable in these cases to produce a satisficing solution that satisfies the most important constraints (typically defined in terms of maximizing a utility function). This paper describes an iterative constraint relaxation approach in which the scheduler uses heuristics to progressively relax problem constraints until the problem becomes satisfiable. We present empirical results of applying these techniques to the problem of scheduling spacecraft communications for JPL/NASA antenna resources.
NASA Technical Reports Server (NTRS)
1985-01-01
The 3rd Quarter Status Report on DFVLR's ROSAT project confirms that with regard to technical performance and costs the project is on schedule. The valid schedule for engineering model and flight model completion on May 7, 1985 leads to a launch date on October 30, 1987. Progress in each department is compared to and explained with regard to the milestone plan. Continued problems with the gold damping of the FM-mirror system and contamination of the sterile rooms where the mirrors are stored have led to postponement of milestone 7. It is not yet completely clear to what extent all successive milestones will be affected by this factor.
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
Juggling Act: Re-Planning and Building on Observatory...Simultaneously!
NASA Technical Reports Server (NTRS)
Zavala, Eddie; Daws, Patricia
2011-01-01
SOFIA (Stratospheric Observatory for Infrared Astronomy) is a major SMD program that has been required to meet several requirements and implement major planning and business initiatives overthe past 1 1/2 years, in the midst of system development and flight test phases. The program was required to implementing JCL and EVM simultaneously, as well as undergo a major replan and Standing Review Board - and all without impacting technical schedule progress. The team developed innovative processes that met all the requirements, and improved Program Management process toolsets. The SOFIA team, being subject to all the typical budget constraints, found ways to leverage existing roles in new ways to meet the requirements without creating unmanageable overhead. The team developed strategies and value added processes - such as improved risk identification, structured reserves management, cost/risk integration - so that the effort expended resulted in a positive return to the program.
NASA Technical Reports Server (NTRS)
Hughes, Chris; Lord, Wed
2008-01-01
Current collaborative research with Pratt & Whitney on Ultra High Bypass Engine Cycle noise, performance and emissions improvements as part of the Subsonic Fixed Wing Project Ultra High Bypass Engine Partnership Element is discussed. The Subsonic Fixed Wing Project goals are reviewed, as well as their relative technology level compared to previous NASA noise program goals. Progress toward achieving the Subsonic Fixed Wing Project goals over the 2008 fiscal year by the UHB Partnership in this area of research are reviewed. The current research activity in Ultra High Bypass Engine Cycle technology, specifically the Pratt & Whitney Geared Turbofan, at NASA and Pratt & Whitney are discussed including the contributions each entity bring toward the research project, and technical plans and objectives. Pratt & Whitney Geared Turbofan current and future technology and business plans are also discussed, including the role the NASA SFW UHB partnership plays toward achieving those goals.
NASA Technical Reports Server (NTRS)
1984-01-01
The work breakdown structure (WBS) for the Space Platform Expendables Resupply Concept Definition Study is described. The WBS consists of a list of WBS elements, a dictionary of element definitions, and an element logic diagram. The list and logic diagram identify the interrelationships of the elements. The dictionary defines the types of work that may be represented by or be classified under each specific element. The Space Platform Expendable Resupply WBS was selected mainly to support the program planning, scheduling, and costing performed in the programmatics task (task 3). The WBS is neither a statement-of-work nor a work authorization document. Rather, it is a framework around which to define requirements, plan effort, assign responsibilities, allocate and control resources, and report progress, expenditures, technical performance, and schedule performance. The WBS element definitions are independent of make-or-buy decisions, organizational structure, and activity locations unless exceptions are specifically stated.
Technical architecture of ONC-approved plans for statewide health information exchange.
Barrows, Randolph C; Ezzard, John
2011-01-01
ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor "hybrid-federated" architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches.
Technical Architecture of ONC-Approved Plans For Statewide Health Information Exchange
Barrows, Randolph C.; Ezzard, John
2011-01-01
ONC-approved state plans for HIE were reviewed for descriptions and depictions of statewide HIE technical architecture. Review was complicated by non-standard organizational elements and technical terminology across state plans. Findings were mapped to industry standard, referenced, and defined HIE architecture descriptions and characteristics. Results are preliminary due to the initial subset of ONC-approved plans available, the rapid pace of new ONC-plan approvals, and continuing advancements in standards and technology of HIE, etc. Review of 28 state plans shows virtually all include a direct messaging component, but for participating entities at state-specific levels of granularity (RHIO, enterprise, organization/provider). About ½ of reviewed plans describe a federated architecture, and ¼ of plans utilize a single-vendor “hybrid-federated” architecture. About 1/3 of states plan to leverage new federal and open exchange technologies (DIRECT, CONNECT, etc.). Only one plan describes a centralized architecture for statewide HIE, but others combine central and federated architectural approaches. PMID:22195059
40 CFR 52.1690 - Small business technical and environmental compliance assistance program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) New York § 52.1690 Small business technical and environmental compliance assistance program. On January 11, 1993, the New York State Department of Environmental Conservation submitted a plan for the... Assistance Program for incorporation in the New York state implementation plan. This plan meets the...
40 CFR 52.2732 - Small business technical and environmental compliance assistance program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...
40 CFR 52.2732 - Small business technical and environmental compliance assistance program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...
40 CFR 52.2732 - Small business technical and environmental compliance assistance program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) Puerto Rico § 52.2732 Small business technical and environmental compliance assistance program. On November 16, 1992, the Puerto Rico Environmental Quality Board submitted a plan for the... Assistance Program for incorporation in the Puerto Rico state implementation plan. This plan meets the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-12
... Information Collection: Comment Request; Technical Assistance for Community Planning and Development Programs AGENCY: Office of the Assistant Secretary for Community Planning And Development, HUD. ACTION: Notice... Community Planning and Development, Department of Housing Urban and Development, 451 7th Street, SW., Room...
DOT National Transportation Integrated Search
2000-01-01
The following progress report is intended to highlight the significant activities of the Florida Transit Training Program and Florida Technical Assistant Program. The following progress report is intended to highlight the significant activities of th...
DOT National Transportation Integrated Search
2001-01-01
The following progress report is intended to highlight the significant activities of the Florida Transit Training Program and Florida Technical Assistant Program for the 2001 year. Activities of the Florida Statewide Transit Training Program are pres...
Transforming South-South technical support to fight noncommunicable diseases.
Shakow, Aaron D A; Bukhman, Gene; Adebona, Olumuyiwa; Greene, Jeremy; de Dieu Ngirabega, Jean; Binagwaho, Agnès
2012-03-01
At the UN High-Level Meeting on non-communicable diseases (NCD) in September 2011, each member state was challenged to create a multisectoral national policy and plan for the prevention and control of non-communicable disease by 2013. Few low-income countries, however, currently have such plans. Their governments are likely to turn for assistance in drafting and implementation to multilateral agencies and Contract Technical Support Organizations recommended by development partners. Yet because many NCD seen in the lowest-income countries differ significantly from those prevalent elsewhere, existing providers of external technical support may lack the necessary experience to support strategic planning for NCD interventions in these settings. This article reviews currently available mechanisms of technical support for health sector planning. It places them in the broader historical context of post- World War II international development assistance and the more recent campaigns for horizontal "South-South" cooperation and aid effectiveness. It proposes bilateral technical assistance by low income-countries themselves as the natural evolution of development assistance in health. Such programs, it argues, may be able to improve the quality of technical support to low-income countries for strategic planning in the NCD area while directing resources to the regions where they are most needed. Copyright © 2012 World Heart Federation (Geneva). Published by Elsevier B.V. All rights reserved.
Steigler, A; Mameghan, H; Lamb, D; Joseph, D; Matthews, J; Franklin, I; Turner, S; Spry, N; Poulsen, M; North, J; Kovacev, O; Denham, J
2000-02-01
In 1997 the Trans-Tasman Radiation Oncology Group (TROG) performed a quality assurance (QA) audit of its phase III randomized clinical trial investigating the effectiveness of different durations of maximal androgen deprivation prior to and during definitive radiation therapy for locally advanced carcinoma of the prostate (TROG 96.01). The audit reviewed a total of 60 cases from 15 centres across Australia and New Zealand. In addition to verification of technical adherence to the protocol, the audit also incorporated a survey of centre planning techniques and a QA time/cost analysis. The present report builds on TROG's first technical audit conducted in 1996 for the phase III accelerated head and neck trial (TROG 91.01) and highlights the significant progress TROG has made in the interim period. The audit provides a strong validation of the results of the 96.01 trial, as well as valuable budgeting and treatment planning information for future trials. Overall improvements were detected in data quality and quantity, and in protocol compliance, with a reduction in the rate of unacceptable protocol violations from 10 to 4%. Audit design, staff education and increased data management resources were identified as the main contributing factors to these improvements. In addition, a budget estimate of $100 per patient has been proposed for conducting similar technical audits. The next major QA project to be undertaken by TROG during the period 1998-1999 is an intercentre dosimetry study. Trial funding and staff education have been targeted as the key major issues essential to the continued success and expansion of TROG's QA programme.
NASA Technical Reports Server (NTRS)
Digman, R. Michael
1988-01-01
The components necessary for the success of the commercialization of an Ada Technology Transition Network are reported in detail. The organizational plan presents the planned structure for services development and technical transition of AdaNET services to potential user communities. The Business Plan is the operational plan for the AdaNET service as a commercial venture. The Technical Plan is the plan from which the AdaNET can be designed including detailed requirements analysis. Also contained is an analysis of user fees and charges, and a proposed user fee schedule.
The Method of Multiple Spatial Planning Basic Map
NASA Astrophysics Data System (ADS)
Zhang, C.; Fang, C.
2018-04-01
The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.
Capability of Rolling Efficiency for 100M High-Speed Rails
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huang, Howard
2014-03-22
OG Technologies, Inc. (OGT), along with its academic and industrial partners, proposes this CORE project for the Capability of Rolling Efficiency for 100m high-speed rails. The goal is to establish the competitive advantage, and thus the sustainability of the US-based rail manufacturers by greatly enhanced efficiency through innovative in-line metrology technology, in-depth process knowledge, and advanced process control to overcome detrimental factors such as higher labor costs that are saddling the US manufacturing sector. This Phase I project was carried out by an industrial-academia team over 9 months. The R&D team successfully completed all technical tasks and accomplished the objectivesmore » for the Phase I. In addition to the technical efforts, the introductory information of this project as well as anticipated progress was disseminated to steel mills interested in the project. The Phase I project has established the technical and commercial basis for additional development. There are needs to further completing the in-line sensing capability, deepening the capability of metamodeling, and supporting the process monitoring and control. The R&D team plans to submit a Phase II proposal based on the findings.« less
Technical Excellence: A Requirement for Good Engineering
NASA Technical Reports Server (NTRS)
Gill, Paul S.; Vaughan, William W.
2008-01-01
Technical excellence is a requirement for good engineering. Technical excellence has many different ways of expressing itself within engineering. NASA has initiatives that address the enhancement of the Agency's technical excellence and thrust to maintain the associated high level of performance by the Agency on current programs/projects and as it moves into the Constellation Program and the return to the Moon with plans to visit Mars. This paper addresses some of the key initiatives associated with NASA's technical excellence thrust. Examples are provided to illustrate some results being achieved and plans to enhance these initiatives.
76 FR 64083 - Reliability Technical Conference; Notice of Technical Conference
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-17
... Technical Conference; Notice of Technical Conference Take notice that the Federal Energy Regulatory Commission will hold a Technical Conference on Tuesday, November 29, 2011, from 1 p.m. to 5 p.m. and... System. The conference will explore the progress made on the priorities for addressing risks to...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2014 CFR
2014-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2012 CFR
2012-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Preparation of technical...
10 kW SOFC Power System Commercialization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dan Norrick; Brad Palmer; Charles Vesely
2006-02-01
Cummins Power Generation (CPG) as the prime contractor and SOFCo-EFS Holdings LLC (SOFCo), as their subcontractor, teamed under the Solid-state Energy Conversion Alliance (SECA) program to develop 3-10kW solid oxide fuel cell systems for use in recreational vehicles, commercial work trucks and stand-by telecommunications applications. The program goal is demonstration of power systems that meet commercial performance requirements and can be produced in volume at a cost of $400/kW. This report summarizes the team's activities during the seventh six-month period (July-December 2005) of the four-year Phase I effort. While there has been significant progress in the development of the SOFCmore » subsystems that can support meeting the program Phase 1 goals, the SOFCo ceramic stack technology has progressed significantly slower than plan and CPG consider it unlikely that the systemic problems encountered will be overcome in the near term. SOFCo has struggled with a series of problems associated with inconsistent manufacturing, inadequate cell performance, and the achievement of consistent, durable, low resistance inter-cell connections with reduced or no precious materials. A myriad of factors have contributed to these problems, but the fact remains that progress has not kept pace with the SECA program. A contributing factor in SOFCo's technical difficulties is attributed to their significantly below plan industry cost share spending over the last four years. This has resulted in a much smaller SOFC stack development program, has contributed to SOFCo not being able to aggressively resolve core issues, and clouds their ability to continue into a commercialization phase. In view of this situation, CPG has conducted an independent assessment of the state-of-the-art in planar SOFC's stacks and have concluded that alternative technology exists offering the specific performance, durability, and low cost needed to meet the SECA objectives. We have further concluded that there is insufficient evidence to reliably predict that SOFCo will be able to achieve the SECA performance and cost goals on a schedule consistent with SECA or CPG commercialization goals. CPG believes SOFCo have made a good faith effort consistent with the available resources, but have repeatedly fallen short of achieving the programs scheduled targets. CPG has therefore initiated a process of application for extension of Phase 1 of our SECA program with the intent of transitioning to an alternative stack supplier with more mature SOFC technology, and demonstrating a system meeting the SECA Phase 1 goals by the end of calendar 2006. We have identified an alternative supplier and will be reporting the progress on transition and program planning in monthly technical reports, reviews, and in the next semiannual report.« less
ERIC Educational Resources Information Center
Innovative Systems Research, Inc., Pennsauken, NJ.
Twelve different conversion plans were delineated and evaluated in the performance of this study effort. An indepth technical, financial, and cost/benefit analysis was included. One plan was determined to be distinctively more cost-effective than any of the other plans because it provided a technically feasible system that assured the maximum…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rosenthal, A
Southwest Technology Development Institute (SWTDI), an independent, university-based research institute, has been the operator of the Southwest Region Photovoltaic Experiment Station (SWRES) for almost 30 years. The overarching mission of SWTDI is to position PV systems and solar technologies to become cost-effective, major sources of energy for the United States. Embedded in SWTDI's general mission has been the more-focused mission of the SWRES: to provide value added technical support to the DOE Solar Energy Technologies Program (SETP) to effectively and efficiently meet the R&D needs and targets specified in the SETP Multi-Year Technical Plan. : The DOE/SETP goals of growingmore » U.S. PV manufacturing into giga-watt capacities and seeing tera-watt-hours of solar energy production in the U.S. require an infrastructure that is under development. The staff of the SWRES has supported DOE/SETP through a coherent, integrated program to address infrastructural needs inhibiting wide-scale PV deployment in three major technical categories: specialized engineering services, workforce development, and deployment facilitation. The SWRES contract underwent three major revisions during its five year period-of- performance, but all tasks and deliverables fell within the following task areas: Task 1: PV Systems Assistance Center 1. Develop a Comprehensive multi-year plan 2. Provide technical workforce development materials and workshops for PV stakeholder groups including university, professional installers, inspectors, state energy offices, Federal agencies 3. Serve on the NABCEP exam committee 4. Provide on-demand technical PV system design reviews for U.S. PV stakeholders 5. Provide PV system field testing and instrumentation, technical outreach (including extensive support for the DOE Market Transformation program) Task 2: Design-for-Manufacture PV Systems 1. Develop and install 18 kW parking carport (cost share) and PV-thermal carport (Albuquerque) deriving and publishing lessons learned Task 3: PV Codes and Standards 1. Serve as the national lead for development and preparation of all proposals (related to PV) to the National Electrical Code 2. Participate in the Standards Technical Panels for modules (UL1703) and inverters (UL1741) Task 4: Assess Inverter Long Term Reliability 1. Install and monitor identical inverters at SWRES and SERES 2. Operate and monitor all inverters for 5 years, characterizing all failures and performance trends Task 5: Test and Evaluation Support for Solar America Initiative 1. Provide test and evaluation services to the National Laboratories for stage gate and progress measurements of SAI TPP winners« less
ACT Plan: Technical Manual. 2013/2014
ERIC Educational Resources Information Center
ACT, Inc., 2013
2013-01-01
This manual contains information about the American College Test (ACT) Plan® program. The principal focus of this manual is to document the Plan program's technical adequacy in light of its intended purposes. This manual supersedes the 2011 edition. The content of this manual responds to requirements of the testing industry as established in the…
A Guide to Systematic Planning for Vocational and Technical Schools. Research 22.
ERIC Educational Resources Information Center
Meckley, Richard F.; And Others
A school planning scheme involving 46 principle activities which occur over a 38-month period is presented. This scheme was developed for individuals responsible for the planning of vocational and technical schools, i.e., supervisors, state staff, university school plant planners, architects, and local school administrators. The activities…
DOT National Transportation Integrated Search
2016-08-01
This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...
INDOT Technical Training Plan : [Technical Summary
DOT National Transportation Integrated Search
2012-01-01
A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...
Watson-Thompson, Jomella; Woods, Nikki Keene; Schober, Daniel J; Schultz, Jerry A
2013-01-01
Community capacity may be enhanced through intermediary supports that provide training and technical assistance (TA). This study used a randomized pre/posttest design to assess the impact of training and TA on coalition capacity. Seven community coalitions from the Midwest participated in the 2-year study, which included 36 hours of training, followed by monthly TA calls to support action planning implementation for prioritized processes. Collaborative processes most commonly identified as high-need areas for TA were Developing Organizational Structure, Documenting Progress, Making Outcomes Matter, and Sustaining the Work. Based on a coalition survey, the average change for processes prioritized through TA across all seven coalitions was .27 (SD = .29), while the average change for non-prioritized processes was .09 (SD = .20) (t(6) = 4.86, p = .003, d = 1.84). The findings from this study suggest that TA can increase coalition capacity for implementing collaborative processes using a participatory approach.
Computational Methods to Assess the Production Potential of Bio-Based Chemicals.
Campodonico, Miguel A; Sukumara, Sumesh; Feist, Adam M; Herrgård, Markus J
2018-01-01
Elevated costs and long implementation times of bio-based processes for producing chemicals represent a bottleneck for moving to a bio-based economy. A prospective analysis able to elucidate economically and technically feasible product targets at early research phases is mandatory. Computational tools can be implemented to explore the biological and technical spectrum of feasibility, while constraining the operational space for desired chemicals. In this chapter, two different computational tools for assessing potential for bio-based production of chemicals from different perspectives are described in detail. The first tool is GEM-Path: an algorithm to compute all structurally possible pathways from one target molecule to the host metabolome. The second tool is a framework for Modeling Sustainable Industrial Chemicals production (MuSIC), which integrates modeling approaches for cellular metabolism, bioreactor design, upstream/downstream processes, and economic impact assessment. Integrating GEM-Path and MuSIC will play a vital role in supporting early phases of research efforts and guide the policy makers with decisions, as we progress toward planning a sustainable chemical industry.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bullin, J.A.; Davison, R.R.; Glover, C.J.
1997-07-01
After an introduction and a literature survey in Chap. 1, Chap. 2 describes the tasks, together with objectives and important results obtained for each task throughout the entire project. Chaps. 3 thru 7 detail work in developing a qualitative and quantitative knowledge of asphalt oxidation, composition dependence of asphalt properties, and guidelines for producing superior asphalt binders through composition control. They also detail the development of a kinetic model for asphalt oxidative aging and present an understanding of the composition dependence of asphalt oxidation as well as other performance-related properties. Chaps. 8 and 9 compare the aging performance of recycledmore » blends produced using commercial recycling agents and industrial supercritical fractions as rejuvenating agents. Oxidative aging of the recycled blends were evaluated along with the performance of the recycled blends in terms of the strategic highway research program performance grading procedure. Chap. 10 summarizes the work completed in the areas of processing schemes development, projection updates, and scale-up and commercialization plans.« less
The changing demographic, legal, and technological contexts of political representation
Forest, Benjamin
2005-01-01
Three developments have created challenges for political representation in the U.S. and particularly for the use of territorially based representation (election by district). First, the demographic complexity of the U.S. population has grown both in absolute terms and in terms of residential patterns. Second, legal developments since the 1960s have recognized an increasing number of groups as eligible for voting rights protection. Third, the growing technical capacities of computer technology, particularly Geographic Information Systems, have allowed political parties and other organizations to create election districts with increasingly precise political and demographic characteristics. Scholars have made considerable progress in measuring and evaluating the racial and partisan biases of districting plans, and some states have tried to use Geographic Information Systems technology to produce more representative districts. However, case studies of Texas and Arizona illustrate that such analytic and technical advances have not overcome the basic contradictions that underlie the American system of territorial political representation. PMID:16230615
REACTOR PHYSICS QUARTERLY REPORT JANUARY, FEBRUARY, MARCH 1970
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schmid, L. C.; Clayton, E. D.; Heineman, R. E.
1970-05-01
The objective of the Reactor Physics Quarterly Report is to inform the scientific community in a timely manner of the technical progress made on the many phases of reactor physics work within the laboratory. The report contains brief technical discussions of accomplishments in all areas where significant progress has been made during the quarter.
TSCA Work Plan Chemical Technical Supplement – Physicochemical Properties and Environmental Fate of the Brominated Phthalates Cluster (BPC) Chemicals -- Brominated Phthalates Cluster Flame Retardants.
Planning a DSN support section technical library
NASA Technical Reports Server (NTRS)
Bailey, T.; Chatburn, C. C.
1980-01-01
The planning procedure being used to establish a technical library for the Deep Space Network support section is described. The inventory and survey methods employed are described and the preliminary results of these methods are discussed.
Wooten, H Omar; Green, Olga; Yang, Min; DeWees, Todd; Kashani, Rojano; Olsen, Jeff; Michalski, Jeff; Yang, Deshan; Tanderup, Kari; Hu, Yanle; Li, H Harold; Mutic, Sasa
2015-07-15
This work describes a commercial treatment planning system, its technical features, and its capabilities for creating (60)Co intensity modulated radiation therapy (IMRT) treatment plans for a magnetic resonance image guidance radiation therapy (MR-IGRT) system. The ViewRay treatment planning system (Oakwood Village, OH) was used to create (60)Co IMRT treatment plans for 33 cancer patients with disease in the abdominal, pelvic, thorax, and head and neck regions using physician-specified patient-specific target coverage and organ at risk (OAR) objectives. Backup plans using a third-party linear accelerator (linac)-based planning system were also created. Plans were evaluated by attending physicians and approved for treatment. The (60)Co and linac plans were compared by evaluating conformity numbers (CN) with 100% and 95% of prescription reference doses and heterogeneity indices (HI) for planning target volumes (PTVs) and maximum, mean, and dose-volume histogram (DVH) values for OARs. All (60)Co IMRT plans achieved PTV coverage and OAR sparing that were similar to linac plans. PTV conformity for (60)Co was within <1% and 3% of linac plans for 100% and 95% prescription reference isodoses, respectively, and heterogeneity was on average 4% greater. Comparisons of OAR mean dose showed generally better sparing with linac plans in the low-dose range <20 Gy, but comparable sparing for organs with mean doses >20 Gy. The mean doses for all (60)Co plan OARs were within clinical tolerances. A commercial (60)Co MR-IGRT device can produce highly conformal IMRT treatment plans similar in quality to linac IMRT for a variety of disease sites. Additional work is in progress to evaluate the clinical benefit of other novel features of this MR-IGRT system. Copyright © 2015 Elsevier Inc. All rights reserved.
Introduction and Progress of APOSOS Project
NASA Astrophysics Data System (ADS)
Zhao, You; Gao, P. Q.; Shen, Ming; Chaudhry, Maqbool A.; Guo, Xiaozhong; Teng, D. P.; Yang, Datao; Yu, Huanhuan; Zhao, Zhe
Asia-Pacific Ground-Based Optical Satellite Observation System (APOSOS) project is based on members of Asia-Pacific Space Cooperation Organization (APSCO). Its aim is to develop a regional or even global satellite tracking network basically composed of optical trackers. The system will be used to track objects of interest or space-debris for the safety of spacecraft launch mission or the intactness of operational satellites. The system will benefit from the distribution of APSCO members and multi-national fund support or technical cooperation. Thus APOSOS will have a potential capability to observe all the satellites orbiting earth with high precision but relatively low cost. This paper will present the introduction, progress and current status of APOSOS project, including: System Requirements Definition, System Main Mission, System Goal, System design, Services and Clients, Organization Framework of Observation Center, Major Function of Observation Center, Establishment of Observation Plan, Format Standard for Exchanging Data, Data Policy, Implementation Schedule, etc.. APOSOS will build a unified surveillance network from observational facilities of member states involved, to utilize the wide geographical distribution advantage of multi-country. It will be operated under the coordination of APSCO observation mission management department. (1)APOSOS should conduct observation missions of specific satellites, space-debris or other space objects of interest, based on requirements of member states. APOSOS should fulfill the basic requirement for satellites observation and tracking missions. And it should also have the potential ability of small debris detection to support collision avoidance planning, which can protect the members high valued space assets. (2)In some particular application, APOSOS would be able to be used for long-term tracking of specific space object of interest, and have the ability of data processing and analysis, so as to provide conjunction assessment, collision probability calculation and avoidance planning for space assets. (3)APOSOS should have the capability of publishing information and sharing data among member states, with the ability to deal with user’s requests for data and mange the data in different levels. (4)APOSOS should have the capability of providing services such as technical consultation, training and science popularization.
George A. Olah, Carbocation and Hydrocarbon Chemistry
. Final Technical Report. [HF:BF{sub 2}/H{sub 2}] , DOE Technical Report, 1980 Superacid Catalyzed Coal Conversion Chemistry. 1st and 2nd Quarterly Technical Progress Reports, September 1, 1983-March 30, 1984 , DOE Technical Report, 1984 Superacid Catalyzed Coal Conversion Chemistry. Final Technical Report
Navigation: National Plans; NAVSTAR-GPS; Laser Gyros
1982-08-31
REFERENC-~CP STER . TECHNICAL REPORT ! "NO. 12686,-’-. - NAVIGATION: NATIONAL PLANS ; NAVSTAR-GPS; LASER GYROS CONTRACT NO. DAAK30-80-C-0073 31 AUGUST...Technical ReportAW Ng. riiNational Plans ; Navstar-GPS; S... : NavstarGPS; a3 Sept 1980 - 31 Aug 1982 ....Lasr Gyros. 6. PERFORMING ORG. REPORT NUMBER PRA...identify by block number) Navigation Navigation Satellites Laser Gyros Position-Location . NAVSTAR-GPS Fiberoptic Gyros Planning Global Positioning System
Zhai, Shiyan; Song, Genxin; Qin, Yaochen; Ye, Xinyue; Lee, Jay
2017-01-01
This study aims to evaluate the impacts of climate change and technical progress on the wheat yield per unit area from 1970 to 2014 in Henan, the largest agricultural province in China, using an autoregressive distributed lag approach. The bounded F-test for cointegration among the model variables yielded evidence of a long-run relationship among climate change, technical progress, and the wheat yield per unit area. In the long run, agricultural machinery and fertilizer use both had significantly positive impacts on the per unit area wheat yield. A 1% increase in the aggregate quantity of fertilizer use increased the wheat yield by 0.19%. Additionally, a 1% increase in machine use increased the wheat yield by 0.21%. In contrast, precipitation during the wheat growth period (from emergence to maturity, consisting of the period from last October to June) led to a decrease in the wheat yield per unit area. In the short run, the coefficient of the aggregate quantity of fertilizer used was negative. Land size had a significantly positive impact on the per unit area wheat yield in the short run. There was no significant short-run or long-run impact of temperature on the wheat yield per unit area in Henan Province. The results of our analysis suggest that climate change had a weak impact on the wheat yield, while technical progress played an important role in increasing the wheat yield per unit area. The results of this study have implications for national and local agriculture policies under climate change. To design well-targeted agriculture adaptation policies for the future and to reduce the adverse effects of climate change on the wheat yield, climate change and technical progress factors should be considered simultaneously. In addition, adaptive measures associated with technical progress should be given more attention.
Qin, Yaochen; Lee, Jay
2017-01-01
This study aims to evaluate the impacts of climate change and technical progress on the wheat yield per unit area from 1970 to 2014 in Henan, the largest agricultural province in China, using an autoregressive distributed lag approach. The bounded F-test for cointegration among the model variables yielded evidence of a long-run relationship among climate change, technical progress, and the wheat yield per unit area. In the long run, agricultural machinery and fertilizer use both had significantly positive impacts on the per unit area wheat yield. A 1% increase in the aggregate quantity of fertilizer use increased the wheat yield by 0.19%. Additionally, a 1% increase in machine use increased the wheat yield by 0.21%. In contrast, precipitation during the wheat growth period (from emergence to maturity, consisting of the period from last October to June) led to a decrease in the wheat yield per unit area. In the short run, the coefficient of the aggregate quantity of fertilizer used was negative. Land size had a significantly positive impact on the per unit area wheat yield in the short run. There was no significant short-run or long-run impact of temperature on the wheat yield per unit area in Henan Province. The results of our analysis suggest that climate change had a weak impact on the wheat yield, while technical progress played an important role in increasing the wheat yield per unit area. The results of this study have implications for national and local agriculture policies under climate change. To design well-targeted agriculture adaptation policies for the future and to reduce the adverse effects of climate change on the wheat yield, climate change and technical progress factors should be considered simultaneously. In addition, adaptive measures associated with technical progress should be given more attention. PMID:28950027
Supply Chain Sustainability Analysis of Whole Algae Hydrothermal Liquefaction and Upgrading
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pegallapati, Ambica Koushik; Dunn, Jennifer B.; Frank, Edward D.
2015-04-01
The Department of Energy's Bioenergy Technology Office (BETO) collaborates with a wide range of institutions towards the development and deployment of biofuels and bioproducts. To facilitate this effort, BETO and its partner national laboratories develop detailed techno-economic assessments (TEA) of biofuel production technologies as part of the development of design cases and state of technology (SOT) analyses. A design case is a TEA that outlines a target case for a particular biofuel pathway. It enables preliminary identification of data gaps and research and development needs and provides goals and targets against which technology progress is assessed. On the other hand,more » an SOT analysis assesses progress within and across relevant technology areas based on actual experimental results relative to technical targets and cost goals from design cases and includes technical, economic, and environmental criteria as available. (SOT) analyses. A design case is a TEA that outlines a target case for a particular biofuel pathway. It enables preliminary identification of data gaps and research and development needs and provides goals and targets against which technology progress is assessed. On the other hand, an SOT analysis assesses progress within and across relevant technology areas based on actual experimental results relative to technical targets and cost goals from design cases and includes technical, economic, and environmental criteria as available. (SOT) analyses. A design case is a TEA that outlines a target case for a particular biofuel pathway. It enables preliminary identification of data gaps and research and development needs and provides goals and targets against which technology progress is assessed. On the other hand, an SOT analysis assesses progress within and across relevant technology areas based on actual experimental results relative to technical targets and cost goals from design cases and includes technical, economic, and environmental criteria as available.« less
Supplement to a Methodology for Succession Planning for Technical Experts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kirk, Bernadette Lugue; Cain, Ronald A.; Agreda, Carla L.
This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a draft methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, and the methodology is tested through interviews with selected subject matter experts.
ERIC Educational Resources Information Center
Boyle, Todd A.
2007-01-01
In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…
ERIC Educational Resources Information Center
Farnsworth, Clayton
The principal of the Southern Nevada Vocational-Technical Center at Las Vegas, Nevada, briefly outlines its development and function. The facility cost approximately 3 million dollars and was built on 390 acres of land purchased from the Federal government. The PERT method was used in planning. Instructional facilities, including those for auto…
Ten rules for asset protection planning.
Adkisson, Jay D; Keller, Lawrence B
2013-12-01
Asset protection planning is a highly technical area of legal planning. Because of the fraudulent transfer laws, asset protection planning must be done in advance of any claim, be technically sound, not rely upon secrecy, and avoid any number of critical mistakes including keeping personal and business assets separate. Physicians who engage in asset protection planning must avoid critical mistakes, and not count on bankruptcy to provide relief from creditors. General rules and cautions for those who are considering the creation of an asset protection plan for their personal assets.
Environmental restoration and waste management five year plan, fiscal years 1994--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
NASA Technical Reports Server (NTRS)
1976-01-01
Contractural requirements, project planning, equipment specifications, and technical data for space shuttle biological experiment payloads are presented. Topics discussed are: (1) urine collection and processing on the space shuttle, (2) space processing of biochemical and biomedical materials, (3) mission simulations, and (4) biomedical equipment.
Progress on the Development of the UAS C2 Link and Supporting Spectrum - from LOS to BLOS
NASA Technical Reports Server (NTRS)
Kerczewski, Robert J.; Griner, James H.; Bishop, William D.; Matolak, David W.; Wilson, Jeffrey D.
2017-01-01
In order to provide for the safe integration of unmanned aircraft systems (UAS) into the National Airspace System, the control and non-payload communications (CNPC) link connecting the ground-based pilot with the unmanned aircraft must be highly reliable and robust, based upon standards that enable certification. Both line-of-sight (LOS) links using terrestrial-based communications and beyond-line-of-sight (BLOS) links using satellite communications are required to support UAS operations. The development of standards has been undertaken by RTCA Special Committee 228 (SC-228), with supporting technical data developed by NASA under the UAS in the National Airspace (NAS) Project. As a result of this work minimum operational performance standards (MOPS) have been completed and published for the LOS CNPC system. The second phase of work, for both NASA and RTCA involves the BLOS CNPC systems. The development of technical data to support MOPS development for UAS BLOS satellite-based CNPC links has now been initiated by NASA, and RTCA SC-228 has organized itself to begin the MOPS development process. This paper will provide an overview of the work that has been completed to date by the Communications Subproject in support of LOS C2 communications for UAS followed by an update of plans and progress for the BLOS phase of the project, with the focus on the UAS C2 spectrum aspects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hasbrouck, J.C.
1992-11-01
Chem-Nuclear Geotech, Inc. (Geotech), operating contractor for the US Department of Energy Grand Junction Projects Office, is conducting the Integrated Geophysics Program for Non-Intrusive Characterization of Mixed-Waste Landfill Sites (Technical Task Plan [TTP] AL921102). The TTP is part of the Mixed-Waste Landfill Integrated Demonstration (MWLID). The objective of this task was to demonstrate that an integrated program of surface geophysics can be used to effectively and nonintrusively characterize n-mixed-waste landfill sites. To accomplish this objective, integrated field demonstrations were conducted over two previously identified areas of interest (designated Areas A and B) within the MWLID test site at the Chemicalmore » Waste Landfill (CWL), Technical Area 3, at the Sandia National Laboratories, Albuquerque, New Mexico (Figures 1 and 2). Area A was centered roughly around the Chromic Acid and Organics Pits in the southeast-central portion of the landfill and Area B was centered around the ``60`s Pits`` area in the northeast-central portion of the landfill. Pit locations were known in Area A and suspected in Area B. This progress report describes the geophysical surveys conducted by Geotech and presents preliminary displays and analyses. Volume 2 of this report contains the raw data for all the surveys conducted by Geotech for this TTP.« less
NASA Astrophysics Data System (ADS)
Lien, F. S.; Yee, E.; Ji, H.; Keats, A.; Hsieh, K. J.
2006-06-01
The release of chemical, biological, radiological, or nuclear (CBRN) agents by terrorists or rogue states in a North American city (densely populated urban centre) and the subsequent exposure, deposition and contamination are emerging threats in an uncertain world. The modeling of the transport, dispersion, deposition and fate of a CBRN agent released in an urban environment is an extremely complex problem that encompasses potentially multiple space and time scales. The availability of high-fidelity, time-dependent models for the prediction of a CBRN agent's movement and fate in a complex urban environment can provide the strongest technical and scientific foundation for support of Canada's more broadly based effort at advancing counter-terrorism planning and operational capabilities.The objective of this paper is to report the progress of developing and validating an integrated, state-of-the-art, high-fidelity multi-scale, multi-physics modeling system for the accurate and efficient prediction of urban flow and dispersion of CBRN (and other toxic) materials discharged into these flows. Development of this proposed multi-scale modeling system will provide the real-time modeling and simulation tool required to predict injuries, casualties and contamination and to make relevant decisions (based on the strongest technical and scientific foundations) in order to minimize the consequences of a CBRN incident in a populated centre.
ERIC Educational Resources Information Center
Van Norman, Ethan R.; Nelson, Peter M.; Parker, David C.
2017-01-01
Computer adaptive tests (CATs) hold promise to monitor student progress within multitiered systems of support. However, the relationship between how long and how often data are collected and the technical adequacy of growth estimates from CATs has not been explored. Given CAT administration times, it is important to identify optimal data…
Education, Industrialization and Technical Progress in Mexico. IIEP Research Report No. 6.
ERIC Educational Resources Information Center
Padua, Jorge
This report attempts to analyze the contributions of the educational system and job training programs to industrialization and technical progress in the Conubal zone of the Lower Balsas River of Mexico. The first of the study's three sections consists of two chapters that provide general background. Chapter 1, "Theories of Development and the…
ERIC Educational Resources Information Center
January, Stacy-Ann A.; Ardoin, Scott P.
2015-01-01
Curriculum-based measurement in reading (CBM-R) and the Measures of Academic Progress (MAP) are assessment tools widely employed for universal screening in schools. Although a large body of research supports the validity of CBM-R, limited empirical evidence exists supporting the technical adequacy of MAP or the acceptability of either measure for…
Annual Technical Progress Report for Emergency School Assistance Program, Title 45, 1970-71.
ERIC Educational Resources Information Center
Lindsey, Randall B.
This paper presents a technical progress report of two programs conducted with funds provided under the Emergency School Assistance Program. One, the Mobile Learning Unit, said to have been designed to measure changes in fourth and fifth grade students' self-concept in a reorganized desegregated school environment, focuses on whether a positive…
Third Progress and Information Report of the Vocational-Technical Education Consortium of States.
ERIC Educational Resources Information Center
Lee, Connie W.; And Others
This description of major activities and accomplishments of the Vocational-Technical Education Consortium of the States (V-TECS) since the second progress report of May, 1975, is designed to provide the reader with a basic understanding of the processes and procedures used by the consortium in achieving its major goal: The production of catalogs…
A PSFI-based analysis on the energy efficiency potential of China’s domestic passenger vehicles
NASA Astrophysics Data System (ADS)
Chen, Chuan; Ren, Huanhuan; Zhao, Dongchang
2017-01-01
In this article, China’s domestic passenger vehicles (excluding new energy vehicles) are categorized into two groups: local brand vehicles and vehicles manufactured by joint ventures. Performance-Size-Fuel economy Index (PSFI) will be applied to analyse the speed of technical progress and the future trends of these vehicles. In addition, a forecast on energy efficiency potential of domestic passenger vehicles from 2016 to 2020 will be made based on different Emphasis on Reducing Fuel Consumption (ERFC) scenarios. According to the study, if the process of technical progress continues at its current speed, domestic ICE passenger vehicles will hardly meet Phase IV requirements by 2020 even though companies contribute as much technical progress to fuel consumption reduction as possible.
Advanced Thermal Emission Imaging Systems Definition and Development
NASA Technical Reports Server (NTRS)
Blasius, Karl; Nava, David (Technical Monitor)
2002-01-01
Santa Barbara Remote Sensing (SBRS), Raytheon Company, is pleased to submit this quarterly progress report of the work performed in the third quarter of Year 2 of the Advanced THEMIS Project, July through September 2002. We review here progress in the proposed tasks. During July through September 2002 progress was made in two major tasks, Spectral Response Characterization and Flight Instrument Definition. Because of staffing problems and technical problems earlier in the program we have refocused the remaining time and budget on the key technical tasks. Current technical problems with a central piece of test equipment has lead us to request a 1 quarter extension to the period of performance. This request is being made through a separate letter independent of this report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stout, D.K.
Flaws are noted in equilibrium growth models which ignore the facts that labor is no longer homogeneous, national governments can no longer guarantee a managed demand, and technical progress is not an independent force. The pace of technical progress is the major variable and increases with competition and certainty in the growth of demand. The outlook for technical progress is examined in the context of productivity, using microprocessor development for illustration. The author takes an optimistic view of new developments in that they do not bring the self-destructive possibility of overpopulation, irreversible damage to the environment, or nuclear war anymore » closer, while having a positive chance to promote a more rewarding relationship between education, work, and life style. The opportunities for positive humanistic changes through microprocessing are confirmed. (DCK)« less
NASA Technical Reports Server (NTRS)
Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil
2007-01-01
The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.
Sharma, Anjali; Chiliade, Philippe; Michael Reyes, E; Thomas, Kate K; Collens, Stephen R; Rafael Morales, José
2013-12-13
In 2008, the US government mandated that HIV/AIDS care and treatment programs funded by the US President's Emergency Plan for AIDS Relief (PEPFAR) should shift from US-based international partners (IPs) to registered locally owned organizations (local partners, or LPs). The US Health Resources and Services Administration (HRSA) developed the Clinical Assessment for Systems Strengthening (ClASS) framework for technical assistance in resource-constrained settings. The ClASS framework involves all stakeholders in the identification of LPs' strengths and needs for technical assistance. This article examines the role of ClASS in building capacity of LPs that can endure and adapt to changing financial and policy environments. All stakeholders (n=68) in Kenya, Zambia, and Nigeria who had participated in the ClASS from LPs and IPs, the US Centers for Disease Control and Prevention (CDC), and, in Nigeria, HIV/AIDS treatment facilities (TFs) were interviewed individually or in groups (n=42) using an open-ended interview guide. Thematic analysis revealed stakeholder perspectives on ClASS-initiated changes and their sustainability. Local organizations were motivated to make changes in internal operations with the ClASS approach, PEPFAR's competitive funding climate, organizational goals, and desired patient health outcomes. Local organizations drew on internal resources and, if needed, technical assistance from IPs. Reportedly, ClASS-initiated changes and remedial action plans made LPs more competitive for PEPFAR funding. LPs also attributed their successful funding applications to their preexisting systems and reputation. Bureaucracy, complex and competing tasks, and staff attrition impeded progress toward the desired changes. Although CDC continues to provide technical assistance through IPs, declining PEPFAR funds threaten the consolidation of gains, smooth program transition, and continuity of treatment services. The well-timed adaptation and implementation of ClASS successfully engaged stakeholders who committed their own resources toward strengthening organizational capacity. The sustainability of built capacity depends on continued investment in leadership, staff retention, and quality improvement.
NASA Institute for Advanced Concepts
NASA Technical Reports Server (NTRS)
Cassanova, Robert A.
1999-01-01
The purpose of NASA Institute for Advanced Concepts (NIAC) is to provide an independent, open forum for the external analysis and definition of space and aeronautics advanced concepts to complement the advanced concepts activities conducted within the NASA Enterprises. The NIAC will issue Calls for Proposals during each year of operation and will select revolutionary advanced concepts for grant or contract awards through a peer review process. Final selection of awards will be with the concurrence of NASA's Chief Technologist. The operation of the NIAC is reviewed biannually by the NIAC Science, Exploration and Technology Council (NSETC) whose members are drawn from the senior levels of industry and universities. The process of defining the technical scope of the initial Call for Proposals was begun with the NIAC "Grand Challenges" workshop conducted on May 21-22, 1998 in Columbia, Maryland. These "Grand Challenges" resulting from this workshop became the essence of the technical scope for the first Phase I Call for Proposals which was released on June 19, 1998 with a due date of July 31, 1998. The first Phase I Call for Proposals attracted 119 proposals. After a thorough peer review, prioritization by NIAC and technical concurrence by NASA, sixteen subgrants were awarded. The second Phase I Call for Proposals was released on November 23, 1998 with a due date of January 31, 1999. Sixty-three (63) proposals were received in response to this Call. On December 2-3, 1998, the NSETC met to review the progress and future plans of the NIAC. The next NSETC meeting is scheduled for August 5-6, 1999. The first Phase II Call for Proposals was released to the current Phase I grantees on February 3,1999 with a due date of May 31, 1999. Plans for the second year of the contract include a continuation of the sequence of Phase I and Phase II Calls for Proposals and hosting the first NIAC Annual Meeting and USRA/NIAC Technical Symposium in NASA HQ.
Sharma, Anjali; Chiliade, Philippe; Reyes, E. Michael; Thomas, Kate K.; Collens, Stephen R.; Morales, José Rafael
2013-01-01
Background In 2008, the US government mandated that HIV/AIDS care and treatment programs funded by the US President's Emergency Plan for AIDS Relief (PEPFAR) should shift from US-based international partners (IPs) to registered locally owned organizations (local partners, or LPs). The US Health Resources and Services Administration (HRSA) developed the Clinical Assessment for Systems Strengthening (ClASS) framework for technical assistance in resource-constrained settings. The ClASS framework involves all stakeholders in the identification of LPs’ strengths and needs for technical assistance. Objective This article examines the role of ClASS in building capacity of LPs that can endure and adapt to changing financial and policy environments. Design All stakeholders (n=68) in Kenya, Zambia, and Nigeria who had participated in the ClASS from LPs and IPs, the US Centers for Disease Control and Prevention (CDC), and, in Nigeria, HIV/AIDS treatment facilities (TFs) were interviewed individually or in groups (n=42) using an open-ended interview guide. Thematic analysis revealed stakeholder perspectives on ClASS-initiated changes and their sustainability. Results Local organizations were motivated to make changes in internal operations with the ClASS approach, PEPFAR's competitive funding climate, organizational goals, and desired patient health outcomes. Local organizations drew on internal resources and, if needed, technical assistance from IPs. Reportedly, ClASS-initiated changes and remedial action plans made LPs more competitive for PEPFAR funding. LPs also attributed their successful funding applications to their preexisting systems and reputation. Bureaucracy, complex and competing tasks, and staff attrition impeded progress toward the desired changes. Although CDC continues to provide technical assistance through IPs, declining PEPFAR funds threaten the consolidation of gains, smooth program transition, and continuity of treatment services. Conclusions The well-timed adaptation and implementation of ClASS successfully engaged stakeholders who committed their own resources toward strengthening organizational capacity. The sustainability of built capacity depends on continued investment in leadership, staff retention, and quality improvement. PMID:24331715
32 CFR 37.420 - Should I tell proposers that we will not disclose information that they submit?
Code of Federal Regulations, 2010 CFR
2010-07-01
... documents; and (ii) Business plans and technical information submitted on a confidential basis. (c) If proposers desire to protect business plans and technical information for five years from FOIA disclosure...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-21
...: These technical amendments are effective on March 21, 2012. FOR FURTHER INFORMATION CONTACT: Doris Lo, EPA Region IX, (415) 972- 3959, lo[email protected] . SUPPLEMENTARY INFORMATION: Technical Amendment for...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
NASA Technical Reports Server (NTRS)
Marchello, Joseph M.
1992-01-01
Progress was made in several areas on the preparation of carbon fiber composites using advanced polymer resins. Polymer infiltration studies dealt with ways of preparing composite materials from advanced polymer resins and carbon fibers. This effort is comprised of an integrated approach to the process of composite part fabrication. The goal is to produce advanced composite materials for automated part fabrication using textile and robotics technology in the manufacture of subsonic and supersonic aircraft. The object is achieved through investigations at the NASA Langley Research Center and by stimulating technology transfer between contract researchers and the aircraft industry. Covered here are literature reviews, a status report on individual projects, current and planned research, publications, and scheduled technical presentations.
Review of the magnetic fusion program by the 1986 ERAB Fusion Panel
NASA Astrophysics Data System (ADS)
Davidson, Ronald C.
1987-09-01
The 1986 ERAB Fusion Panel finds that fusion energy continues to be an attractive energy source with great potential for the future, and that the magnetic fusion program continues to make substantial technical progress. In addition, fusion research advances plasma physics, a sophisticated and useful branch of applied science, as well as technologies important to industry and defense. These factors fully justify the substantial expenditures by the Department of Energy in fusion research and development (R&D). The Panel endorses the overall program direction, strategy, and plans, and recognizes the importance and timeliness of proceeding with a burning plasma experiment, such as the proposed Compact Ignition Tokamak (CIT) experiment.
Progress toward a new measurement of the neutron lifetime
NASA Astrophysics Data System (ADS)
Grammer, Kyle
2015-10-01
Free neutron decay is the simplest nuclear beta decay. A precise value for the neutron lifetime is valuable for standard model consistency tests and Big Bang Nucleosynthesis models. There is a disagreement between the measured neutron lifetime from cold neutron beam experiments and ultracold neutron storage experiments. A new measurement of the neutron lifetime using the beam method is planned at the National Institute of Standards and Technology Center for Neutron Research. Experimental improvements should result in a 1s uncertainty measurement of the neutron lifetime. The technical improvements, recent apparatus tests, and the path towards the new measurement will be discussed. This work is supported by DOE Office of Science, NIST, and NSF.
Progress toward a new measurement of the neutron lifetime
NASA Astrophysics Data System (ADS)
Grammer, Kyle
2015-04-01
Free neutron decay is the simplest nuclear beta decay. A precise value for the neutron lifetime is valuable for standard model consistency tests and Big Bang Nucleosynthesis models. There is a disagreement between the measured neutron lifetime from cold neutron beam experiments and ultracold neutron storage experiments. A new measurement of the neutron lifetime using the beam method is planned at the National Institute of Standards and Technology Center for Neutron Research. Experimental improvements should result in a 1s uncertainty measurement of the neutron lifetime. The technical improvements and the path towards the new measurement will be discussed. This work is supported by DOE Office of Science, NIST, and NSF.
NASA Technical Reports Server (NTRS)
Vincent, R. A. (Editor); Edwards, B. (Editor); Hirota, I. (Editor)
1991-01-01
Extended abstracts from the fourth workshop on the technical and scientific aspects of mesosphere stratosphere troposphere (MST) radar are presented. Individual sessions addressed the following topics: meteorological applications of MST and ST radars, networks, and campaigns; the dynamics of the equatorial middle atmosphere; interpretation of radar returns from clear air; techniques for studying gravity waves and turbulence, intercomparison and calibration of wind and wave measurements at various frequencies; progress in existing and planned MST and ST radars; hardware design for MST and ST radars and boundary layer/lower troposphere profilers; signal processing; and data management.
The Incremental Launching Method for Educational Virtual Model
NASA Astrophysics Data System (ADS)
Martins, Octávio; Sampaio, A. Z.
This paper describes the application of virtual reality technology to the development of an educational model related to the construction of a bridge. The model allow the visualization of the physical progression of the work following a planned construction sequence, the observation of details of the form of every component of the works and carry the study of the type and method of operation of the equipment applied in the construction. The model admit interaction and then some degree of collaboration between students and teachers in the analyses of aspects concerning geometric forms, working methodology or other technical issues observed using the application. The model presents distinct advantage as educational aids in first-degree courses in Civil Engineering.
Cost and Schedule Analytical Techniques Development
NASA Technical Reports Server (NTRS)
1996-01-01
This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1994 through November 30, 1995. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cottrell, W.B.; Klein, A.
1977-02-23
This index to Nuclear Safety covers articles in Nuclear Safety Vol. 11, No. 1 (Jan.-Feb. 1970), through Vol. 17, No. 6 (Nov.-Dec. 1976). The index includes a chronological list of articles (including abstract) followed by KWIC and Author Indexes. Nuclear Safety, a bimonthly technical progress review prepared by the Nuclear Safety Information Center, covers all safety aspects of nuclear power reactors and associated facilities. The index lists over 350 technical articles in the last six years of publication.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-15
... Care and Network-Based Private Fee-for-Service Plans Under Part C (Sec. 422.112) 7. Deemable Program... Cost by HMO/CMP Cost Contractors and Health Care Prepayment Plans (HCPPs) (Sec. 417.564) 4. Calculation... and Other Technical Changes 1. Application of Subpart M to Health Care Prepayment Plans (Sec. 417.840...
ERIC Educational Resources Information Center
Stoehr, Keith W.; Covelli, Nicholas J.
This report presents Gateway Technical Institute's long-range plan for 1982-1987. After prefatory material discussing financial and non-financial factors that may impinge on the plan, Chapter I outlines the socioeconomic situation in the three-county area of Wisconsin served by the college and introduces some of the critical issues that the…
ERIC Educational Resources Information Center
Lutzin, Sidney G.
The United States has made striking technical advances in recent years, but there has not been comparable progress in social services. Greater affluence and leisure for some have been one result of technical progress, but problems of poverty and urban development are more pressing. New developments to improve the condition of society can be…
ERIC Educational Resources Information Center
HANKIN, EDWARD K.; AND OTHERS
THIS TECHNICAL PROGRESS REPORT COVERS THE FIRST THREE MONTHS OF A PROJECT TO DEVELOP COMPUTER ASSISTED PREVOCATIONAL READING AND ARITHMETIC COURSES FOR DISADVANTAGED YOUTHS AND ADULTS. DURING THE FIRST MONTH OF OPERATION, PROJECT PERSONNEL CONCENTRATED ON SUCH ADMINISTRATIVE MATTERS AS TRAINING STAFF AND PREPARING FACILITIES. AN ARITHMETIC PROGRAM…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hammer, D.A.; Kusse, B.R.; Sudan, R.N.
1983-07-01
The progress on this contract is described in two parts. The first deals with the technical operation of the LION accelerator which is the exact equivalent to one line of PBFA-I. The second part is concerned with the experimental results on the ion diode mounted at the front end of the LION accelerator.
ERIC Educational Resources Information Center
National Foundation for the Improvement of Education, Washington, DC.
Reported is the third quarter, fiscal year 1974 (March 1, 1974-May 31, 1974) technical progress of Project LIFE (Language Improvement to Facilitate Education), toward developing an instructional system in which filmstrips in the areas of perceptual training, perceptual thinking, and language/reading are used to assist hearing impaired children in…
Obuchowski, Nancy A; Buckler, Andrew; Kinahan, Paul; Chen-Mayer, Heather; Petrick, Nicholas; Barboriak, Daniel P; Bullen, Jennifer; Barnhart, Huiman; Sullivan, Daniel C
2016-04-01
A major initiative of the Quantitative Imaging Biomarker Alliance is to develop standards-based documents called "Profiles," which describe one or more technical performance claims for a given imaging modality. The term "actor" denotes any entity (device, software, or person) whose performance must meet certain specifications for the claim to be met. The objective of this paper is to present the statistical issues in testing actors' conformance with the specifications. In particular, we present the general rationale and interpretation of the claims, the minimum requirements for testing whether an actor achieves the performance requirements, the study designs used for testing conformity, and the statistical analysis plan. We use three examples to illustrate the process: apparent diffusion coefficient in solid tumors measured by MRI, change in Perc 15 as a biomarker for the progression of emphysema, and percent change in solid tumor volume by computed tomography as a biomarker for lung cancer progression. Copyright © 2016 The Association of University Radiologists. All rights reserved.
Mission EarthFusing GLOBE with NASA Assets to Build SystemicInnovation in STEM Education
NASA Astrophysics Data System (ADS)
Czajkowski, K. P.; Garik, P.; Padgett, D.; Darche, S.; Struble, J.; Adaktilou, N.
2016-12-01
Mission Earth is a project funded through the NASA CAN that is developing a systematic embedding of NASA assets that is being implemented by a partnership of organizations across the US. Mission Earth brings together scientists and science educators to develop a K-12 "Earth as a system" curriculum progression following research-based best practices. GLOBE and NASA assets will be infused into the curricula of schools along the K-12 continuum, leveraging existing partnerships and networks and supported through state departments of education and targeting underrepresented groups, as a systemic, effective, and sustainable approach to meeting NASA's science education objectives. This presentation will discuss plans for the Mission Earth project and successes and lessons learned in the first year. Mission Earth is developing curricular materials to support vertically integrated learning progressions. It develops models of professional development utilizing sustainable infrastructures. It will support STEM careers focusing on career technical education (CTE). And, it will engage undergraduate education majors through pre-service courses and engineering students through engineering challenges.
Housing, health and master planning: rules of engagement.
Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P
2014-04-01
Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.
10 CFR 603.420 - Disclosure of information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... types that are exempt: (i) Proposals, proposal abstracts, and supporting documents; and (ii) Business plans and technical information submitted on a confidential basis. (c) If proposers desire to protect business plans and technical information for five years from FOIA disclosure requirements, they must mark...
DOT National Transportation Integrated Search
2017-11-01
This report is one of two NCST Research Report documents produced as part of a project to advance the technical modeling tools for resiliency and adaptation planning, especially those used for criticality rankings. The official final technical report...
Code of Federal Regulations, 2011 CFR
2011-04-01
... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...
Code of Federal Regulations, 2012 CFR
2012-04-01
... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...
Code of Federal Regulations, 2014 CFR
2014-04-01
... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...
Code of Federal Regulations, 2013 CFR
2013-04-01
... Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.68 May non-BIA bureaus provide technical assistance to a Tribe/Consortium in drafting its...
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ulm, Franz-Josef
2000-06-30
OAK-B135 Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 4. The analysis of the effect of cracks on the acceleration of the calcium leaching process of cement-based materials has been pursued. During the last period (Technical Progress Report No 3), we have introduced a modeling accounting for the high diffusivity of fractures in comparison with the weak solid material diffusivity. It has been shown through dimensional and asymptotic analysis that small fractures do not significantly accelerate the material aging process. This important result for the overall structural aging kinetics of containment structure has beenmore » developed in a paper submitted to the international journal ''Transport in Porous Media''.« less
Dyer, Brandon A; Jenshus, Abriel; Mayadev, Jyoti S
2018-02-28
Radiation therapy (RT) plays a definitive role in locally advanced vulvar cancer, and in the adjuvant setting with high risk postoperative features after wide local excision. There is significant morbidity associated with traditional, large RT fields using 2D or 3D techniques, and the use of intensity-modulated radiation therapy (IMRT) in vulvar cancer is increasing. However, there remains a paucity of technical information regarding the prevention of a marginal miss during the treatment planning process. The use of an integrated skin flash (ISF) during RT planning can be used to account for anatomic variation, and intra- and interfraction motion seen during treatment. Herein we present the case of a patient with a T1aN0M0, Stage IA vulva cancer to illustrate the progressive vulvar swelling and lymph edema seen during treatment and retrospectively evaluate the dosimetric effects of using an ISF RT plan vs standard RT planning techniques. Standard planning techniques to treat vulvar cancer patients with IMRT do not sufficiently account for the change in patient anatomy and can lead to a marginal miss. ISF is an RT planning technique that can decrease the risk of a marginal miss and the technique is easily implemented during the planning stages of RT treatment. Furthermore, use of an ISF technique can improve vulvar clinical target volume coverage and plan homogeneity. Based on our experience, and this study, a 2-cm ISF is suggested to account for variations in daily clinical setup and changes in patient anatomy during treatment. Published by Elsevier Inc.
Annual Report of the Metals and Ceramics Information Center, 1 May 1979-30 April 1980.
1980-07-01
MANAGEMENT AND ECONOMIC ANALYSIS DEPT. * Computer and Information SyslemsiD. C Operations 1 Battelle Technical Inputs to Planning * Computer Systems 0...Biomass Resources * Education 0 Business Planning * Information Systems * Economics , Planning and Policy Analysis * Statistical and Mathematical Modelrng...Metals and Ceramics Information Center (MCIC) is one of several technical information analysis centers (IAC’s) chartered and sponsored by the
Career Opportunities in Texas: A Master Plan for Vocational and Technical Education (1989 Update).
ERIC Educational Resources Information Center
Texas State Board of Education, Austin.
In January 1987, a Master Plan for the delivery of vocational and technical education in Texas was adopted by the State Board of Education (SBOE). The master plan details goals and strategies to assist in the development of a skilled and educated work force in Texas as the state enters the 21st century. As part of their mandated annual review…
On December 9, 2013, EPA reconvened the study’s Technical Roundtable. Subject-matter experts discussed the outcomes of the 2013 Technical Workshops, stakeholder engagement, and plans for draft assessment report.
Mutemwa, Richard; Mayhew, Susannah H; Warren, Charlotte E; Abuya, Timothy; Ndwiga, Charity; Kivunaga, Jackline
2017-01-01
Abstract The aim of this study was to investigate association between HIV and family planning integration and technical quality of care. The study focused on technical quality of client–provider consultation sessions. The cross-sectional study observed 366 client–provider consultation sessions and interviewed 37 health care providers in 12 public health facilities in Kenya. Multilevel random intercept and linear regression models were fitted to the matched data to investigate relationships between service integration and technical quality of care as well as associations between facility-level structural and provider factors and technical quality of care. A sensitivity analysis was performed to test for hidden bias. After adjusting for facility-level structural factors, HIV/family planning integration was found to have significant positive effect on technical quality of the consultation session, with average treatment effect 0.44 (95% CI: 0.63–0.82). Three of the 12 structural factors were significantly positively associated with technical quality of consultation session including: availability of family planning commodities (9.64; 95% CI: 5.07–14.21), adequate infrastructure (5.29; 95% CI: 2.89–7.69) and reagents (1.48; 95% CI: 1.02–1.93). Three of the nine provider factors were significantly positively associated with technical quality of consultation session: appropriate provider clinical knowledge (3.14; 95% CI: 1.92–4.36), job satisfaction (2.02; 95% CI: 1.21–2.83) and supervision (1.01; 95% CI: 0.35–1.68), while workload (−0.88; 95% CI: −1.75 to − 0.01) was negatively associated. Technical quality of the client–provider consultation session was also determined by duration of the consultation and type of clinic visit and appeared to depend on whether the clinic visit occurred early or later in the week. Integration of HIV care into family planning services can improve the technical quality of client–provider consultation sessions as measured by both health facility structural and provider factors. PMID:29194543
Mutemwa, Richard; Mayhew, Susannah H; Warren, Charlotte E; Abuya, Timothy; Ndwiga, Charity; Kivunaga, Jackline
2017-11-01
The aim of this study was to investigate association between HIV and family planning integration and technical quality of care. The study focused on technical quality of client-provider consultation sessions. The cross-sectional study observed 366 client-provider consultation sessions and interviewed 37 health care providers in 12 public health facilities in Kenya. Multilevel random intercept and linear regression models were fitted to the matched data to investigate relationships between service integration and technical quality of care as well as associations between facility-level structural and provider factors and technical quality of care. A sensitivity analysis was performed to test for hidden bias. After adjusting for facility-level structural factors, HIV/family planning integration was found to have significant positive effect on technical quality of the consultation session, with average treatment effect 0.44 (95% CI: 0.63-0.82). Three of the 12 structural factors were significantly positively associated with technical quality of consultation session including: availability of family planning commodities (9.64; 95% CI: 5.07-14.21), adequate infrastructure (5.29; 95% CI: 2.89-7.69) and reagents (1.48; 95% CI: 1.02-1.93). Three of the nine provider factors were significantly positively associated with technical quality of consultation session: appropriate provider clinical knowledge (3.14; 95% CI: 1.92-4.36), job satisfaction (2.02; 95% CI: 1.21-2.83) and supervision (1.01; 95% CI: 0.35-1.68), while workload (-0.88; 95% CI: -1.75 to - 0.01) was negatively associated. Technical quality of the client-provider consultation session was also determined by duration of the consultation and type of clinic visit and appeared to depend on whether the clinic visit occurred early or later in the week. Integration of HIV care into family planning services can improve the technical quality of client-provider consultation sessions as measured by both health facility structural and provider factors. © The Author 2017. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine.
Low Impact Development Master Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loftin, Samuel R.
This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1994-01-01
The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Smith, Jacqueline G.; Gardner, James E.
1990-01-01
The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Gardner, J. E.; Dixon, S. C.
1986-01-01
The Langley Research Center Loads and Aeroelasticity Division's research accomplishments for FY85 and research plans for FY86 are presented. The rk under each branch (technical area) will be described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Gardner, James E.; Dixon, S. C.
1987-01-01
The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
Staff Considerations in Technical Services: The Chameleon Approach.
ERIC Educational Resources Information Center
Foster, Constance L.
1988-01-01
Discusses the need to cope effectively with technological transitions in library technical services and to plan for successful staff development. The areas discussed include changing job skills, financial planning, ergonomics, innovative partnerships, training, and an emphasis on human resources development. (21 references) (Author/CLB)
Waste Receiving and Processing (WRAP) Module 1 Hazards Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
CAMPBELL, L.R.
1999-09-29
This document establishes the technical basis in support of Emergency Planning activities for the WRAP Module 1 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone is demonstrated.
7 CFR 1468.9 - Conservation farm plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... Prior to contract approval, a conservation farm plan must be written and approved. In deciding whether... applicable NRCS field office technical guide or as approved by the State Conservationist. (e) Participants... participant's request, the NRCS may provide technical assistance to a participant. (1) Participants may, at...
Integrating Science with Technical and Vocational Areas.
ERIC Educational Resources Information Center
Snyder, Larry; Shreckengast, Craig
This guide presents learning activities and lesson plans that integrate science with technical and vocational areas. Activities and plans are organized under broad headings such as Environmental Science and Acid Rain Research; Criminal Justice, Chemistry, and Narcotics; Children's Education and Services; Cosmetology; and Health Professions.…
Technical and Occupational Shops.
ERIC Educational Resources Information Center
Ontario Dept. of Education, Toronto. School Planning and Building Research Section.
This booklet presents suggested plans and specifications for and discusses facilities common to technical and occupational shops. Drawings, room plans, and text illustrate specifications for drafting rooms, a welding shop, an automechanics shop, an auto body shop, and a high school greenhouse. Also included are facility designs for agricultural…
Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owen, P.T.; Michelson, D.C.; Knox, N.P.
1987-09-01
The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program,more » Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.« less
Field Test of the Methodology for Succession Planning for Technical Experts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cain, Ronald A.; Kirk, Bernadette Lugue; Agreda, Carla L.
This report complements A Methodology for Succession Planning for Technical Experts (Ron Cain, Shaheen Dewji, Carla Agreda, Bernadette Kirk, July 2017), which describes a methodology for identifying and evaluating the loss of key technical skills at nuclear operations facilities. This report targets the methodology for identifying critical skills, hereafter referred to as “core competencies”. The methodology has been field tested by interviewing selected retiring subject matter experts (SMEs).
32 CFR 203.10 - Eligible activities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...
32 CFR 203.10 - Eligible activities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...
32 CFR 203.10 - Eligible activities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... with technical reports that summarize data and support cleanup decisions. Technical assistance may be provided to review plans and interpret technical reports for community members of RABs and TRCs. These...) MISCELLANEOUS TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) IN DEFENSE ENVIRONMENTAL RESTORATION...
Department of Clinical Investigation Annual Research Progress Report, Fiscal Year 1984. Volume 1,
1984-10-01
on a low dosage of medication . Technical Approach: None. Progress: The placebo has not been received from the company. Since the drug company...determine the effect of high dose Ar-C intensification therapy on the -. incidence of CNS relapse. - Technical Approach: All patients with a new...Enrolled to Date: 7 Date of Periodic Review Results Objective(s): To determine the incidence of
Technical assessment of Mir-1 life support hardware for the international space station
NASA Technical Reports Server (NTRS)
Mitchell, K. L.; Bagdigian, R. M.; Carrasquillo, R. L.; Carter, D. L.; Franks, G. D.; Holder, D. W., Jr.; Hutchens, C. F.; Ogle, K. Y.; Perry, J. L.; Ray, C. D.
1994-01-01
NASA has been progressively learning the design and performance of the Russian life support systems utilized in their Mir space station. In 1992, a plan was implemented to assess the benefits of the Mir-1 life support systems to the Freedom program. Three primary tasks focused on: evaluating the operational Mir-1 support technologies and understanding if specific Russian systems could be directly utilized on the American space station and if Russian technology design information could prove useful in improving the current design of the planned American life support equipment; evaluating the ongoing Russian life support technology development activities to determine areas of potential long-term application to the U.S. space station; and utilizing the expertise of their space station life support systems to evaluate the benefits to the current U.S. space station program which included the integration of the Russian Mir-1 designs with the U.S. designs to support a crew of six.
Damage resistant optics for a mega-joule solid-state laser
NASA Astrophysics Data System (ADS)
Campbell, J. H.; Rainer, F.; Kozlowski, M. R.; Wolfe, C. R.; Thomas, I.; Milanovich, F.
1990-12-01
Research on Inertial Confinement Fusion (ICF) has progressed rapidly in the past several years. As a consequence, LLNL is developing plans to upgrade the current 120 kJ solid state (Nd3+ phosphate glass) Nova laser to a 1.5 to 2 megajoule system with the goal of achieving fusion ignition. The design of the planned Nova Upgrade is briefly discussed. Because of recent improvements in the damage resistance of optical materials it is now technically and economically feasible to build a megajoule-class solid state laser. Specifically, the damage threshold of Nd(+3)-doped phosphate laser glass, multilayer dielectric coatings, and non-linear optical crystals (e.g., KDP) have been dramatically improved. These materials now meet the fluence requirements for a 1.5 to 2 MJ Nd(+3)-glass laser operating at 1054 and 351 nm and at a pulse length of 3 ns. The recent improvements in damage thresholds are reviewed; threshold data at both 1064 and 355 nm and the measured pulse length scaling are presented.
Damage resistant optics for a megajoule solid state laser
NASA Astrophysics Data System (ADS)
Campbell, Jack H.; Rainer, Frank; Kozlowski, Mark R.; Wolfe, C. Robert; Thomas, Ian M.; Milanovich, Fred P.
1991-06-01
Research on Inertial Confinement Fusion (ICF) has progressed rapidly in the past several years. As a consequence LLNL is developing plans to upgrade the current 120 kJ solid state (Nd3-phosphate glass) Nova laser to a 1 . 5 to 2 megajoule system with the goal of achieving fusion ignition. The design of the planned Nova Upgrade is briefly discussed. Because of recent improvements in the damage resistance of optical materials it is now technically and economically feasible to build a megajoule-class solid state laser. Specifically the damage threshold of Nd3- doped phosphate laser glass muliilayer dielectric coatings and non-linear optical crystals (e. g. KDP) have been dramatically improved. These materials now meet the fluence requirements for a 1. 5-2 MJ Nd3-glass laser operating at 1054 and 351 nm and at a pulse length of 3 ns. The recent improvements in damage thresholds are reviewed threshold data at both 1064 and 355 nm and the measured pulse length scaling are presented. 1.
[Teaching methods for clinical settings: a literature review].
Brugnolli, Anna; Benaglio, Carla
2017-01-01
. Teaching Methods for clinical settings: a review. The teaching process during internship requires several methods to promote the acquisition of more complex technical skills such as relational, decisional and planning abilities. To describe effective teaching methods to promote the learning of relational, decisional and planning skills. A literature review of the teaching methods that have proven most effective, most appreciated by students, and most frequently used in Italian nursing schools. Clinical teaching is a central element to transform clinical experiences during internship in professional competences. The students are gradually brought to become more independent, because they are offered opportunities to practice in real contexts, to receive feedback, to have positive role models, to become more autonomous: all elements that facilitate and potentiate learning. Clinical teaching should be based on a variety of methods. The students value a gradual progression both in clinical experiences and teaching strategies from more supervised methods to methods more oriented towards reflecting on clinical practice and self-directed learning.
The Technical Work Plan Tracking Tool
NASA Technical Reports Server (NTRS)
Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.
2003-01-01
The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.
NASA Astrophysics Data System (ADS)
Phuong, Vu Hung
2018-03-01
This research applies Data Envelopment Analysis (DEA) approach to analyze Total Factor Productivity (TFP) and efficiency changes in Vietnam coal mining industry from 2007 to 2013. The TFP of Vietnam coal mining companies decreased due to slow technological progress and unimproved efficiency. The decadence of technical efficiency in many enterprises proved that the coal mining industry has a large potential to increase productivity through technical efficiency improvement. Enhancing human resource training, technology and research & development investment could help the industry to improve efficiency and productivity in Vietnam coal mining industry.
ERIC Educational Resources Information Center
Salem County Board for Vocational Education, Woodstown, NJ.
A strategic plan for vocational-technical education (VTE) in Salem County, New Jersey, in the year 2002 was developed by the county board of VTE and county advisory board with input from students, parents, employers, elected officials, and the community in general. Six strategic planning subcommittees were formed to review the district's VTE…
Scheduling Accessory Assists Patients with Cognitive Disorders
NASA Technical Reports Server (NTRS)
2007-01-01
Recom Technologies Inc. received initial funding from NASA to research the commercial potential of an artificially intelligent planning reaction model to serve as a tool to help individuals suffering from various forms and levels of brain impairment. In 1993, the chief of the Artificial Intelligence Research Branch at Ames Research Center suggested collaborative research with Santa Clara Valley Medical Center. This partnership led to further development of the technology and funding to support clinical research from the U.S. Department of Education's National Institute on Disability and Rehabilitation Research. In 1996, Attention Control Systems Inc. was founded to market the finished device, called the Planning and Execution Assistant and Trainer (PEAT). PEAT is a pocket-sized PDA-like device with a graphical display, touchscreen controls, an electronic calendar, an address book, and a built-in phone, that cues users to start or stop scheduled activities, monitors their progress, and adjusts schedules as necessary in response to delays or calendar changes. It uses an automatic planning model developed for NASA to adjust daily plans when a situation changes. PEAT is sold as a complete system that includes software, hardware, documentation, and technical support. In addition to the flagship Pocket PEAT device, there is PEAT Phone, PC PEAT, and PEAT Link. Clinical studies of PEAT continue at Santa Clara Valley Medical Center
Ortiz Oshiro, Elena; Ramos Carrasco, Angel; Moreno Sierra, Jesús; Pardo Martínez, Cristina; Galante Romo, Isabel; Bullón Sopelana, Fernando; Coronado Martín, Pluvio; Mansilla García, Iván; Escudero Mate, María; Vidart Aragón, José A; Silmi Moyano, Angel; Alvarez Fernández-Represa, Jesús
2010-02-01
Da Vinci system (Intuitive Surgical) is a surgical telemanipulator providing many technical advantages over conventional laparoscopic approach (3-D vision, ergonomics, highly precise movements, endowrist instrumentation...) and it is currently applied to several specialties throughout the world since 2000. The first Spanish public hospital incorporating this robotic technology was Hospital Clinico San Carlos (HCSC) in Madrid, in July 2006. We present the multidisciplinary organization and clinical, research and training outcomes of the Robotic Surgery Plan developed in the HCSC. Starting from joint management and joint scrub nurses team, General and Digestive Surgery, Urology and Gynaecology Departments were progressively incorporated into the Robotic Surgery Plan, with several procedures increasing in complexity. A number of intra and extra-hospital teaching and information activities were planned to report on the Robotic Surgery Plan. Between July 2006 and July 2008, 306 patients were operated on: 169 by General Surgery, 107 by Urology and 30 by Gynaecology teams. The outcomes showed feasibility and a short learning curve. The educational plan included residents and staff interested in robotic technology application. The structured and gradual incorporation of robotic surgery throughout the PCR-HCSC has made it easier to learn, to share designed infrastructure, to coordinate information activities and multidisciplinary collaboration. This preliminary experience has shown the efficiency of an adequate organization and motivated team. Copyright 2009 AEC. Published by Elsevier Espana. All rights reserved.
Hospedales, C James; Barcelo, Alberto; Luciani, Silvana; Legetic, Branka; Ordunez, Pedro; Blanco, Adriana
2012-03-01
This article describes efforts from the Pan American Health Organization (PAHO) that have supported progress in country-driven planning and implementing of actions to address noncommunicable diseases (NCD), as well as mechanisms that PAHO has supported for countries in the Americas to share and build on each other's experiences. The Regional Strategy and Plan of Action for NCD, approved by all member states in 2006, is the major frame for this work. The strategy has 4 lines of action: policy and advocacy; surveillance; health promotion and disease prevention; and integrated management of NCD and risk factors. Cross-cutting strategies include resource mobilization, communication, training, and networks and partnerships. The strategy is operationalized through biannual work plans for which countries link and commit to achieving specific objectives. PAHO then provides technical support toward achieving these plans, and countries report progress annually. The CARMEN (Collaborative Action for Risk Factor Prevention and Effective Management of NCD [Conjunto de Acciones para la Reducción y el Manejo de las Enfermedades No transmisibles]) Network provides a major platform for sharing, and the multisector Pan American Forum for Action on NCD has been launched to extend the network to include business and civil society. PAHO also supported civil society capacity building. Almost all member states have made substantial progress in implementing their national chronic disease programs, in most instances reporting exceeding the indicators of the strategic plan related to chronic diseases. From the Caribbean countries, leadership has been provided to achieve the historic UN High-Level Meeting on NCD in September 2011. The region is on track to meet the mortality reduction target set for 2013, though much remains to be done to further increase awareness of and resources for scaling up NCD prevention and control programs, given the huge health and economic burden, increasing costs, and worrying increases of some conditions such as obesity. Major challenges include getting NCD into social protection packages, building the human resource capacity, strengthening surveillance, achieving true intersectoral and multipartner action, given that most determinants of the epidemic lie outside the health sector, and increasing investment in prevention. Copyright © 2012 World Heart Federation (Geneva). Published by Elsevier B.V. All rights reserved.
Alternative sample sizes for verification dose experiments and dose audits
NASA Astrophysics Data System (ADS)
Taylor, W. A.; Hansen, J. M.
1999-01-01
ISO 11137 (1995), "Sterilization of Health Care Products—Requirements for Validation and Routine Control—Radiation Sterilization", provides sampling plans for performing initial verification dose experiments and quarterly dose audits. Alternative sampling plans are presented which provide equivalent protection. These sampling plans can significantly reduce the cost of testing. These alternative sampling plans have been included in a draft ISO Technical Report (type 2). This paper examines the rational behind the proposed alternative sampling plans. The protection provided by the current verification and audit sampling plans is first examined. Then methods for identifying equivalent plans are highlighted. Finally, methods for comparing the cost associated with the different plans are provided. This paper includes additional guidance for selecting between the original and alternative sampling plans not included in the technical report.
48 CFR 2011.104-70 - NRC Clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Technical Reports, when deliverables include a technical report. (b) The contracting officer shall insert the clause at 2052.211-71 Technical Progress Report, in all solicitations and contracts except— (1...) The contracting officer shall insert the clause at 2052.211-72 Financial Status Report, in applicable...
48 CFR 2011.104-70 - NRC Clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Technical Reports, when deliverables include a technical report. (b) The contracting officer shall insert the clause at 2052.211-71 Technical Progress Report, in all solicitations and contracts except— (1...) The contracting officer shall insert the clause at 2052.211-72 Financial Status Report, in applicable...
48 CFR 2011.104-70 - NRC Clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Technical Reports, when deliverables include a technical report. (b) The contracting officer shall insert the clause at 2052.211-71 Technical Progress Report, in all solicitations and contracts except— (1...) The contracting officer shall insert the clause at 2052.211-72 Financial Status Report, in applicable...
48 CFR 2011.104-70 - NRC Clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Technical Reports, when deliverables include a technical report. (b) The contracting officer shall insert the clause at 2052.211-71 Technical Progress Report, in all solicitations and contracts except— (1...) The contracting officer shall insert the clause at 2052.211-72 Financial Status Report, in applicable...
48 CFR 2011.104-70 - NRC Clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Technical Reports, when deliverables include a technical report. (b) The contracting officer shall insert the clause at 2052.211-71 Technical Progress Report, in all solicitations and contracts except— (1...) The contracting officer shall insert the clause at 2052.211-72 Financial Status Report, in applicable...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 2 2014-07-01 2014-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 2 2013-07-01 2013-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 2 2011-07-01 2011-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 2 2012-07-01 2012-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
40 CFR 52.2037 - Control strategy plans for attainment and rate-of-progress: Ozone.
Code of Federal Regulations, 2012 CFR
2012-07-01
... and rate-of-progress: Ozone. 52.2037 Section 52.2037 Protection of Environment ENVIRONMENTAL... (CONTINUED) Pennsylvania § 52.2037 Control strategy plans for attainment and rate-of-progress: Ozone. (a) Part D—Conditional Approval—the Pennsylvania plan for carbon monoxide and ozone is approved provided...
40 CFR 52.2037 - Control strategy plans for attainment and rate-of-progress: Ozone.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and rate-of-progress: Ozone. 52.2037 Section 52.2037 Protection of Environment ENVIRONMENTAL... (CONTINUED) Pennsylvania § 52.2037 Control strategy plans for attainment and rate-of-progress: Ozone. (a) Part D—Conditional Approval—the Pennsylvania plan for carbon monoxide and ozone is approved provided...
40 CFR 52.2037 - Control strategy plans for attainment and rate-of-progress: Ozone.
Code of Federal Regulations, 2010 CFR
2010-07-01
... and rate-of-progress: Ozone. 52.2037 Section 52.2037 Protection of Environment ENVIRONMENTAL... (CONTINUED) Pennsylvania § 52.2037 Control strategy plans for attainment and rate-of-progress: Ozone. (a) Part D—Conditional Approval—the Pennsylvania plan for carbon monoxide and ozone is approved provided...
40 CFR 52.2037 - Control strategy plans for attainment and rate-of-progress: Ozone.
Code of Federal Regulations, 2011 CFR
2011-07-01
... and rate-of-progress: Ozone. 52.2037 Section 52.2037 Protection of Environment ENVIRONMENTAL... (CONTINUED) Pennsylvania § 52.2037 Control strategy plans for attainment and rate-of-progress: Ozone. (a) Part D—Conditional Approval—the Pennsylvania plan for carbon monoxide and ozone is approved provided...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, Jun
This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less
Succession Planning for Management Staff at a Western Canadian Postsecondary Technical Institute.
ERIC Educational Resources Information Center
Cembrowski, Barbara Joan; da Costa, Jose L.
This study used naturalistic inquiry to gain an understanding of how managerial personnel perceived career development and succession planning at a postsecondary technical institute in Canada. A total of nine individuals in three different career development stages completed semistructured interviews. It was found that managers perceived the…
Succession Planning for Management Staff at a Canadian Post Secondary Technical Institute.
ERIC Educational Resources Information Center
da Costa, Jose; Cembrowski, Barbara
2001-01-01
Analyzed interviews to explore how nine administrators, at three different career stages, perceived career-development and succession planning at a Canadian postsecondary technical institute. Managers attribute career success to possession of varied personal attributes, diverse work experiences, serendipity, and a fulfilling work environment. Job…
Chattanooga State Technical Community College Marketing Plan 1981-82.
ERIC Educational Resources Information Center
Hoppe, Sherry; Haddock, David
Chattanooga State Technical Community College's (CSTCC's) marketing plan is presented in six parallel sections. The first of these deals with building the overall image of the college, increasing community awareness, and disseminating general information. The other five sections focus on marketing the following college programs and services:…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-30
... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will...-time and day-ahead market efficiency through improved software. A detailed agenda with the list of and...
A Technical Evaluation of the First Stage of the Mediterranean Regional Project.
ERIC Educational Resources Information Center
Hollister, Robinson
Objectives of this technical evaluation concerning the transfer of experience in the development of human resources were to develop educational plans based upon comprehensive estimates of manpower requirements and to evaluate the methods used in estimating manpower requirements for educational planning. The methodology involved estimates of the…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-13
... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference: Increasing Real-Time and Day- Ahead Market Efficiency Through Improved Software Take notice that Commission staff will... for increasing real-time and day-ahead market efficiency through improved software. This conference...
Development of Cooperative Planning for Technical-Vocational Programs.
ERIC Educational Resources Information Center
Cisco Junior Coll., TX.
During the past decade vocational-technical education in Texas has grown so rapidly that now attention must be given to enrollments, employment projections, and more efficient utilization of the limited resources available. Cisco and Ranger Junior Colleges serve essentially the same population and a plan for close cooperation and coordination is…
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business stationary source... PLANS Delaware § 52.460 Small business stationary source technical and environmental compliance... Environmental Control submitted a plan for the establishment and implementation of a Small Business Stationary...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hahn, H
This paper discusses the ISABELLE project, which has the objective of constructing a high-energy proton colliding beam facility at Brookhaven National Laboratory. The major technical features of the intersecting storage accelerators with their projected performance are described. Application of over 1000 superconducting magnets in the two rings represents the salient characteristic of the machine. The status of the entire project, the technical progress made so far, and difficulties encountered are reviewed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bender, W.
2013-01-01
Final technical progress report of SunShot Incubator Solaflect Energy. The project succeeded in demonstrating that the Solaflect Suspension Heliostat design is viable for large-scale CSP installations. Canting accuracy is acceptable and is continually improving as Solaflect improves its understanding of this design. Cost reduction initiatives were successful, and there are still many opportunities for further development and further cost reduction.
[3D imaging benefits in clinical pratice of orthodontics].
Frèrejouand, Emmanuel
2016-12-01
3D imaging possibilities raised up in the last few years in the orthodontic field. In 2016, it can be used for diagnosis improvement and treatment planning by using digital set up combined to CBCT. It is relevant for orthodontic mechanic updating by creating visible or invisible customised appliances. It forms the basis of numerous scientific researches. The author explains the progress 3D imaging brings to diagnosis and clinics but also highlights the requirements it creates. The daily use of these processes in orthodontic clinical practices needs to be regulated regarding the benefit/risk ratio and the patient satisfaction. The command of the digital work flow created by these technics requires habits modifications from the orthodontist and his staff. © EDP Sciences, SFODF, 2016.
Gilstrap, R.C.; Lamb, T.E.
1982-01-01
The objectives of the cooperative program with the Arkansas State Highway and Transportation Department are described. Accomplishments within the program are summarized and reports are listed. The accomplishments include operation of a crest-stage station network, modeling of rainfall-runoff station data, publication of drainage-area reports for all major river basins in Arkansas, floodflow-characteristics reports at proposed bridge sites, furnishing peak-flow and stage information at many sites, and furnishing technical advice and field training to Highway and Transportation Department personnel. Program plans for the 1982 fiscal year are listed and discussed. Other water-resources programs and publications that may be of interest are discussed and all available flood-prone-area maps for Arkansas are listed.
Saudi Arabia's experience in solar energy applications
NASA Astrophysics Data System (ADS)
Huraib, Fahad S.
The progress in solar energy research in Saudi Arabia is discussed with emphasis on the efforts of a government research entity - King Adbulaziz City for Science and Technology (KACST). Three programs currently underway at KACST are considered: the continuation of activities initiated under the Solar Energy Research American/Saudi (SOLERAS) program, a Saudi/German program, and projects developed and conducted completely by KACST. The objectives, management structure, and program organization of SOLEARS are outlined, and attention is focused on urban, rural/agricultural, and industrial applications as well as resource development activities and accomplishments. Solar-hydrogen projects pursued together with Germany are reviewed, and their objectives, program management, and technical plans are covered. Domestic programs dealing with photovoltaic-powered lightning and hot-water systems are summarized.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Stephanie Stilson (right), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon- Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Stephanie Stilson (left), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Stephanie Stilson (left), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Stephanie Stilson (second from right), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon- Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Stephanie Stilson (center), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon- Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
LHCNet: Wide Area Networking and Collaborative Systems for HEP
DOE Office of Scientific and Technical Information (OSTI.GOV)
Newman, H.B,
2007-08-20
This proposal presents the status and progress in 2006-7, and the technical and financial plans for 2008-2010 for the US LHCNet transatlantic network supporting U.S. participation in the LHC physics program. US LHCNet provides transatlantic connections of the Tier1 computing facilities at Fermilab and Brookhaven with the Tier0 and Tier1 facilities at CERN as well as Tier1s elsewhere in Europe and Asia. Together with ESnet, Internet2, the GEANT pan-European network, and NSF’s UltraLight project, US LHCNet also supports connections between the Tier2 centers (where most of the analysis of the data will take place, starting this year) and the Tier1smore » as needed.See report« less
Cost and Schedule Analytical Techniques Development: Option 1
NASA Technical Reports Server (NTRS)
1996-01-01
This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1995 through November 30, 1996. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) and the Program Plans and Requirements Officer (PPO2). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.
NASA Technical Reports Server (NTRS)
Morgenstern, John; Norstrud, Nicole; Stelmack, Marc; Skoch, Craig
2010-01-01
The N+3 Final Report documents the work and progress made by Lockheed Martin Aeronautics in response to the NASA sponsored program "N+3 NRA Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2030 to 2035 Period." The key technical objective of this effort was to generate promising supersonic concepts for the 2030 to 2035 timeframe and to develop plans for maturing the technologies required to make those concepts a reality. The N+3 program is aligned with NASA's Supersonic Project and is focused on providing alternative system-level solutions capable of overcoming the efficiency, environmental, and performance barriers to practical supersonic flight
2004-07-23
KENNEDY SPACE CENTER, FLA. - Stephanie Stilson (left), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
2004-07-23
KENNEDY SPACE CENTER, FLA. - Stephanie Stilson (left), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
2004-07-23
KENNEDY SPACE CENTER, FLA. - Stephanie Stilson (second from right), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
2004-07-23
KENNEDY SPACE CENTER, FLA. - Stephanie Stilson (center), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
2004-07-23
KENNEDY SPACE CENTER, FLA. - Stephanie Stilson (right), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
Launching to the Moon, Mars, and Beyond
NASA Technical Reports Server (NTRS)
Shivers, C. Herbert
2008-01-01
This viewgraph presentation reviews the planned launching to the Moon, and Mars. It is important to build beyond the capacity to ferry astronauts and cargo to low Earth orbit. NASA is starting to design new vehicles using the past lessons to minimize cost, and technical risks. The training and education of engineers that will continue the work of designing, testing and flying the vehicles is important to NASA. The following questions were addressed: 1) What is NASA's mission? 2) Why do we explore? 3) What is our timeline? 4) Why the Moon first? 5) What will the vehicles look like? 5) What progress have we made? 6) Who will be doing the work? and 7) What are the benefits of space exploration?
NASA Technical Reports Server (NTRS)
Ringermacher, Harry I.; Conradi, Mark S.; Cassenti, Brice N.; Millis, Marc G. (Technical Monitor)
2001-01-01
The Program Planning meeting was held on Jan 27-28 at the Washington University, Dept. of Physics. Experiment strategies and details were discussed and milestones mapped. Dr. Ringermacher, the program technical leader and Co-Principal Investigator, presented a Physics Department seminar on the theory and experiment in progress. Following the meeting Professor Conradi (CO-PI) and his students designed the NMR probe and electronics required for the experiment and submitted the drawings to the shop for fabrication. Dr. Cassenti, at UTRC, initiated analytic and computer analysis of the experimental conditions in order to anticipate possible classical effects. Dr. Ringermacher, at KRONOTRAN, re-evaluated the experiment interpretation from the theory and continued working to secure its underpinnings.
Application of dexterous space robotics technology to myoelectric prostheses
NASA Astrophysics Data System (ADS)
Hess, Clifford; Li, Larry C. H.; Farry, Kristin A.; Walker, Ian D.
1994-02-01
Future space missions will require robots equipped with highly dexterous robotic hands to perform a variety of tasks. A major technical challenge in making this possible is an improvement in the way these dexterous robotic hands are remotely controlled or teleoperated. NASA is currently investigating the feasibility of using myoelectric signals to teleoperate a dexterous robotic hand. In theory, myoelectric control of robotic hands will require little or no mechanical parts and will greatly reduce the bulk and weight usually found in dexterous robotic hand control devices. An improvement in myoelectric control of multifinger hands will also benefit prosthetics users. Therefore, as an effort to transfer dexterous space robotics technology to prosthetics applications and to benefit from existing myoelectric technology, NASA is collaborating with the Limbs of Love Foundation, the Institute for Rehabilitation and Research, and Rice University in developing improved myoelectric control multifinger hands and prostheses. In this paper, we will address the objectives and approaches of this collaborative effort and discuss the technical issues associated with myoelectric control of multifinger hands. We will also report our current progress and discuss plans for future work.
Application of dexterous space robotics technology to myoelectric prostheses
NASA Technical Reports Server (NTRS)
Hess, Clifford; Li, Larry C. H.; Farry, Kristin A.; Walker, Ian D.
1994-01-01
Future space missions will require robots equipped with highly dexterous robotic hands to perform a variety of tasks. A major technical challenge in making this possible is an improvement in the way these dexterous robotic hands are remotely controlled or teleoperated. NASA is currently investigating the feasibility of using myoelectric signals to teleoperate a dexterous robotic hand. In theory, myoelectric control of robotic hands will require little or no mechanical parts and will greatly reduce the bulk and weight usually found in dexterous robotic hand control devices. An improvement in myoelectric control of multifinger hands will also benefit prosthetics users. Therefore, as an effort to transfer dexterous space robotics technology to prosthetics applications and to benefit from existing myoelectric technology, NASA is collaborating with the Limbs of Love Foundation, the Institute for Rehabilitation and Research, and Rice University in developing improved myoelectric control multifinger hands and prostheses. In this paper, we will address the objectives and approaches of this collaborative effort and discuss the technical issues associated with myoelectric control of multifinger hands. We will also report our current progress and discuss plans for future work.
Progress on the New York State Observatory: a new 12-meter astronomical telescope
NASA Astrophysics Data System (ADS)
Sebring, T.; O'Dea, C.; Baum, S.; Teran, J.; Loewen, N.; Stutzki, C.; Egerman, R.; Bonomi, G.
2014-07-01
Over the past two years, the New York Astronomical Corporation (NYAC), the business arm of the Astronomical Society of New York (ASNY), has continued planning and technical studies toward construction of a 12-meter class optical telescope for the use of all New York universities and research institutions. Four significant technical studies have been performed investigating design opportunities for the facility, the dome, the telescope optics, and the telescope mount. The studies were funded by NYAC and performed by companies who have provided these subsystems for large astronomical telescopes in the past. In each case, innovative and cost effective approaches were identified, developed, analyzed, and initial cost estimates developed. As a group, the studies show promise that this telescope could be built at historically low prices. As the project continues forward, NYAC intends to broaden the collaboration, pursue funding, to continue to develop the telescope and instrument designs, and to further define the scientific mission. The vision of a historically large telescope dedicated to all New York institutions continues to grow and find new adherents.
Overview of the ISOL facility for the RISP
NASA Astrophysics Data System (ADS)
Woo, H. J.; Kang, B. H.; Tshoo, K.; Seo, C. S.; Hwang, W.; Park, Y.-H.; Yoon, J. W.; Yoo, S. H.; Kim, Y. K.; Jang, D. Y.
2015-02-01
The key feature of the Isotope Separation On-Line (ISOL) facility is its ability to provide high-intensity and high-quality beams of neutron-rich isotopes with masses in the range of 80-160 by means of a 70-MeV proton beam directly impinging on uranium-carbide thin-disc targets to perform forefront research in nuclear structure, nuclear astrophysics, reaction dynamics and interdisciplinary fields like medical, biological and material sciences. The technical design of the 10-kW and the 35-kW direct fission targets with in-target fission rates of up to 1014 fissions/s has been finished, and for the development of the ISOL fission-target chemistry an initial effort has been made to produce porous lanthanum-carbide (LaCx) discs as a benchmark for the final production of porous UCx discs. For the production of various beams, three classes of ion sources are under development at RISP (Rare Isotope Science Project), the surface ion source, the plasma ion source (FEBIAD), the laser ion source, and the engineering design of the FEBIAD is in progress for prototype fabrication. The engineering design of the ISOL target/ion source front-end system is also in progress, and a prototype will be used for an off-line test facility in front of the pre-separator. The technical designs of other basic elements at the ISOL facility, such as the RF-cooler, the high-resolution mass separator, and the A/q separator, have been finished, and the results, along with the future plans, are introduced.
Putnam, James E.; Hansen, Cristi V.
2014-01-01
As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, M.M.; Chao, B.T.
This technical progress report covers the progress made during the fifth quarter of the project entitled Measurements of Solids Motion in Gas Fluidized Beds under Grant No. DOE-F22-81PC40804 during the period 1 October through 31 December 1982. The research concerns the measurement of solids particle velocity distribution and residence time distribution using the Computer-Aided Particle Tracking Facility (CAPTF) at the University of Illinois at Urbana-Champaign. The experimental equipment and measuring methods used to determine particle size distribution and particle motion and the results obtained are presented.
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1993-01-01
The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Dixon, S. C.; Gardner, James E.
1988-01-01
The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
ERIC Educational Resources Information Center
Baker, William E.; And Others
The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in engineering and industrial fields. A…
ERIC Educational Resources Information Center
Baker, William E.; And Others
The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in agriculture and related businesses. A…
Health Related Occupations. Revised Summary Report: Technical Employment in Northeast Florida.
ERIC Educational Resources Information Center
Baker, William E.; And Others
The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in health related occupations. A three-phase…
2008-07-28
continue to be beyond our technical ability to realize aggresively pursue advanced technical solutions to stay at the leading edge of technological...inherent to each caf Way and to seek continual improvement through exploration of innovative concepts, advanced capabilities, game -changing...available online at the air force portal: https://wwwd.my.af.mil/afknprod/strat_plan COMBAT AIR FORCE STRATEGIC PLAN Points of Contact securing the high
NASA Technical Reports Server (NTRS)
Gardner, J. E.; Dixon, S. C.
1985-01-01
The loads and aeroelasticity divisions research accomplishments are presented. The work under each branch or technical area, described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
Code of Federal Regulations, 2013 CFR
2013-07-01
... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...
Code of Federal Regulations, 2010 CFR
2010-07-01
... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...
Code of Federal Regulations, 2014 CFR
2014-07-01
... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...
Code of Federal Regulations, 2012 CFR
2012-07-01
... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...
Code of Federal Regulations, 2011 CFR
2011-07-01
... PLANS (CONTINUED) Wisconsin § 52.2586 Small business stationary source technical and environmental compliance assistance program. The Wisconsin small business stationary source technical and environmental...
The 1996 NAEP Technical Report.
ERIC Educational Resources Information Center
Allen, Nancy L.; Carlson, James E.; Zelenak, Christine A.
This report documents the design, administration, and data analysis procedure of the National Assessment of Education Progress (NAEP) for 1996. It indicates the technical decisions that were made and the rationale behind them. Detailed substantive findings are not presented in this report. These chapters provide technical information about the…
10 CFR 905.40 - Technical assistance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Technical assistance. 905.40 Section 905.40 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Energy Services § 905.40 Technical assistance. Western shall establish a program that provides technical assistance to customers to conduct integrated...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wooten, H. Omar, E-mail: hwooten@radonc.wustl.edu; Green, Olga; Yang, Min
2015-07-15
Purpose: This work describes a commercial treatment planning system, its technical features, and its capabilities for creating {sup 60}Co intensity modulated radiation therapy (IMRT) treatment plans for a magnetic resonance image guidance radiation therapy (MR-IGRT) system. Methods and Materials: The ViewRay treatment planning system (Oakwood Village, OH) was used to create {sup 60}Co IMRT treatment plans for 33 cancer patients with disease in the abdominal, pelvic, thorax, and head and neck regions using physician-specified patient-specific target coverage and organ at risk (OAR) objectives. Backup plans using a third-party linear accelerator (linac)-based planning system were also created. Plans were evaluated bymore » attending physicians and approved for treatment. The {sup 60}Co and linac plans were compared by evaluating conformity numbers (CN) with 100% and 95% of prescription reference doses and heterogeneity indices (HI) for planning target volumes (PTVs) and maximum, mean, and dose-volume histogram (DVH) values for OARs. Results: All {sup 60}Co IMRT plans achieved PTV coverage and OAR sparing that were similar to linac plans. PTV conformity for {sup 60}Co was within <1% and 3% of linac plans for 100% and 95% prescription reference isodoses, respectively, and heterogeneity was on average 4% greater. Comparisons of OAR mean dose showed generally better sparing with linac plans in the low-dose range <20 Gy, but comparable sparing for organs with mean doses >20 Gy. The mean doses for all {sup 60}Co plan OARs were within clinical tolerances. Conclusions: A commercial {sup 60}Co MR-IGRT device can produce highly conformal IMRT treatment plans similar in quality to linac IMRT for a variety of disease sites. Additional work is in progress to evaluate the clinical benefit of other novel features of this MR-IGRT system.« less
Lincoln County nuclear waste project. Quarterly progress report, October 1, 1991--December 31, 1991
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-03-01
This document included the following three progress reports to the Yucca Mountain Project Office on radioactive waste storage in Lincoln County, Nevada: financial status report; federal cash transactions report; and technical progress report.
Lincoln County nuclear waste project. Quarterly progress report, January 1, 1992--March 31, 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-03-01
This document included the following three progress reports to the Yucca Mountain Project Office on radioactive waste storage in Lincoln County, Nevada: financial status report; federal cash transactions report; and technical progress report.
Lincoln County nuclear waste project quarterly progress report, April 1, 1992--June 30, 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-03-01
This document included the following three progress reports to the Yucca Mountain Project Office on radioactive waste storage in Lincoln County, Nevada: financial status report; federal cash transactions report; and technical progress report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cottrell, W.B.; Passiakos, M.
This index to Nuclear Safety covers articles published in Nuclear Safety, Volume 18, Number 1 (January-February 1977) through Volume 22, Number 6 (November-December 1981). The index is divided into three section: a chronological list of articles (including abstracts), a permuted-title (KWIC) index, and an author index. Nuclear Safety, a bimonthly technical progress review prepared by the Nuclear Safety Information Center, covers all safety aspects of nuclear power reactors and associated facilities. Over 300 technical articles published in Nuclear Safety in the last 5 years are listed in this index.
National Action Plan on Superconductivity Research and Development
NASA Astrophysics Data System (ADS)
1989-12-01
The Superconductivity Action Plan pursuant to the Superconductivity and Competitiveness Act of 1988 is presented. The plan draws upon contributions from leaders in the technical community of the Federal Government responsible for research and development in superconductivity programs, as well as from the report of the Committee to Advise the President on Superconductivity. Input from leaders in the private sector was obtained during the formulation and review of the plan. Some contents: Coordination of the plan; Technical areas (high temperature superconductivity materials in general, high temperature superconductivity films for sensors and electronics, magnets, large area high temperature superconductivity films, bulk conductors); and Policy areas.
ERIC Educational Resources Information Center
Cathcart, Margaret E.
1997-01-01
Describes development of strategic objectives at the Research, Development, Test, and Evaluation Division of the Naval Command, Control and Ocean Surveillance Center (NRaD). Discusses its plan to achieve these objectives. States that the organization's responsibilities span the continuum of information using technical communication skills. Uses…
A Strategic Plan for Texas State Technical Institute.
ERIC Educational Resources Information Center
Texas State Technical Inst., Waco.
Following two decades of growth, both enrollment and funding at the Texas State Technical Institute (TSTI) have declined sharply over the last 5 years. In April 1989, the TSTI initiated a strategic planning process incorporating a strategy based on meeting a clearly recognized and understood public need that is within the role, scope, and mission…
Nevada State Five-Year Plan: July 1, 2008 through June 30, 2013
ERIC Educational Resources Information Center
Nevada Department of Education, 2008
2008-01-01
With the recent enactment of the Carl D. Perkins Career and Technical Education Act of 2006, Congress has demonstrated overwhelming bipartisan support to continue the country's federal investment in career and technical education. This document, the "Nevada State Five-Year Plan for the Carl D. Perkins Act of 2006," referred hereinafter…
ERIC Educational Resources Information Center
Vivian, Neal E.
To upgrade research and research utilization competence of vocational educators, The Center for Vocational and Technical Education and The American Vocational Association planned four 1-week research training programs on: (1) Planning Vocational/Technical Education Programs Based on Manpower Research, (2) Patterns of Career Development as Applied…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-25
...--The Wireless Association (CTIA); Comments of Ericsson, Inc. (Ericsson); Comments of Squire Sanders (US... promptly develop such plans, because OMB is not authorized to make any transfers from the Fund unless the... plans. See CTIA Comments at 7 (``Technical information such as transmitter power, receiver performance...
A&M. Technical service laboratory in administration building (TAN602). Floor plan, ...
A&M. Technical service laboratory in administration building (TAN-602). Floor plan, reception desk, door and finish schedules. Ralph M. Parsons 1480-12-ANP/GE-3-602-A-1. INEEL index code no. 033-0602-00-693-107488 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
New Concepts in Vocational-Technical Programs and Planning.
ERIC Educational Resources Information Center
Mochon, Clint
The latest principle behind designing and planning vocational-technical school is "built-in-pride", which must be motivated in both student and surrounding community. We are at last emerging from the dark tunnel of the "trade school", away from the cold institutional look, the clamor of shop classrooms, echoing corridors, and the invisible tattoo…
ERIC Educational Resources Information Center
Merrimack Education Center, Chelmsford, MA.
This report of the Technical Assistance Study provided to the Smithville Public Schools by the Technology Lighthouse of the Merrimack Education Center offers information for use in planning computer technology applications over a 3-year period. It provides specific guidelines and criteria for planning and development, equipment considerations,…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... Market and Planning Efficiency Through Improved Software; Notice of Agenda and Procedures for Staff Technical Conference June 10, 2010. This notice establishes the agenda and procedures for the staff[email protected] . Kimberly D. Bose, Secretary. Agenda for AD10-12 Staff Technical Conference on Enhanced Power...
Renard, Paul G; Vagi, Sara J; Reinold, Chris M; Silverman, Brenda L; Avchen, Rachel N
2017-09-01
To evaluate and describe outcomes of state and local medical countermeasure preparedness planning, which is critical to ensure rapid distribution and dispensing of a broad spectrum of life-saving medical assets during a public health emergency. We used 2007 to 2014 state and local data collected from the Centers for Disease Control and Prevention's Technical Assistance Review. We calculated descriptive statistics from 50 states and 72 local Cities Readiness Initiative jurisdictions that participated in the Technical Assistance Review annually. From 2007 to 2014, the average overall Technical Assistance Review score increased by 13% for states and 41% for Cities Readiness Initiative jurisdictions. In 2014, nearly half of states achieved the maximum possible overall score (100), and 94% of local Cities Readiness Initiative jurisdictions achieved a score of 90 or more. Despite challenges, effective and timely medical countermeasure distribution and dispensing is possible with appropriate planning, staff, and resources. However, vigilance in training, exercising, and improving plans from lessons learned in a sustained, coordinated way is critical to ensure continued public health preparedness success.
Technology in education: A guidebook for developing a science and math education support program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, C.L.
1992-09-01
Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization's strengths and resources with the needs of the school system. Following these getting started'' activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less
Technology in education: A guidebook for developing a science and math education support program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, C.L.
1992-09-01
Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization`s strengths and resources with the needs of the school system. Following these ``getting started`` activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-20
... Information Collection for Public Comment; Office of Native American Programs (ONAP) Training and Technical... subject proposal. The data required by Office of Native American Programs Training and Technical... progress. The data identifies needs, outputs and outcomes of the training and technical assistance. DATES...
New partnership for health? Business groups on health and health systems agencies.
Bradbury, R C
1983-01-01
The experience of the Central Massachusetts Health Systems Agency (CMHSA) and the Central Massachusetts Business Group on Health (CMBGH) demonstrates the feasibility of cooperation between HSAs and BGHs. Objectives and strategies of the two groups in carrying out community health planning and working for health systems change are compared. Nearly two decades of government-sponsored community health planning programs, first through comprehensive health planning agencies and then through HSAs, have had less impact than many had anticipated because neither the technical nor political basis for such planning was sufficiently established. The CMHSA experience is typical, although it is credited with developing a hospital systems plan that is based on sound planning methods and statistical data. It is in the implementation of plans that the CMHSA has made slow progress, reflecting its inadequate community power base. The CMBGH, 1 of more than 90 groups that have developed recently across the country to attack high health care costs, was formed in 1981 by business leaders to address these rising costs. The principal strategy adopted by the CMBGH involves fostering a competitive health care market by creating a critical number of competing health plans. The providers in each plan will then have incentives to provide effective care in an efficient manner to keep the premium competitive and attract enrollees. Cooperation between the CMBGH and CMHSA is based on each organization's emphasizing its strengths. The CMHSA's data base and analyses have been the primary resources used by the CMBGH to identify problems. Each organization has developed its own set of goals and objectives, while keeping in mind those of the other organization.(ABSTRACT TRUNCATED AT 250 WORDS) PMID:6419277
Delgado, Guilherme Costa
2017-07-01
This paper aims to conduct a conceptual analysis of the relationship between scientific and technical progress and social equality, or the reduction of inequalities. We examine this relationship by drawing on three theoretical perspectives: 1) ethical economics, championed by classical economic thinkers and centered on utilitarian self-interest, 2) Mainstream theories of economic development espousing the endogenous link between labor productivity growth and technical progress, 3) the critique of theories of economic development that emerged in the second half of the twentieth century, including Celso Furtado's critique of the theory of underdevelopment, emphasizing the prevalence of egalitarian tendencies, and ecological economics, which suggest alternative paths to those set by "classical" theories of development. The fundamental antinomy posed by the title of this article, characterized by an intrinsic contradiction between technical progress and social equality, strictly presupposes the ethical economics perspective, dominated by the social relations that constitute the "social order".
Goal Reconstruction: How Teton Blends Situated Action and Planned Action
1989-11-03
DTIC FILE COPy 00 P 1n GOAL RECONSTRUCTION: HOW TETON BLENDS N SITUATED ACTION AND PLANNED ACTION Technical Report AIP 125 Kurt VanLehn William Ball...distribiikn unlimited. so 08 21 2 GOAL RECONSTRUCTION: HOW TETON BLENDS SITUATED ACTION AND PLANNED ACTION Technical Report AlP 125 Kurt VanLehn William Ball...Architectures for Intelligence. This is the final report on the research supported by the Computer Science Division, Office of Naval Research, under
44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Provision of technical... PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance... technical assistance to the licensee. Such assistance may be provided during the pendency of an appeal under...
Scripes, Paola G; Yaparpalvi, Ravindra
2012-09-01
The usage of functional data in radiation therapy (RT) treatment planning (RTP) process is currently the focus of significant technical, scientific, and clinical development. Positron emission tomography (PET) using ((18)F) fluorodeoxyglucose is being increasingly used in RT planning in recent years. Fluorodeoxyglucose is the most commonly used radiotracer for diagnosis, staging, recurrent disease detection, and monitoring of tumor response to therapy (Lung Cancer 2012;76:344-349; Lung Cancer 2009;64:301-307; J Nucl Med 2008;49:532-540; J Nucl Med 2007;48:58S-67S). All the efforts to improve both PET and computed tomography (CT) image quality and, consequently, lesion detectability have a common objective to increase the accuracy in functional imaging and thus of coregistration into RT planning systems. In radiotherapy, improvement in target localization permits reduction of tumor margins, consequently reducing volume of normal tissue irradiated. Furthermore, smaller treated target volumes create the possibility of dose escalation, leading to increased chances of tumor cure and control. This article focuses on the technical aspects of PET/CT image acquisition, fusion, usage, and impact on the physics of RTP. The authors review the basic elements of RTP, modern radiation delivery, and the technical parameters of coregistration of PET/CT into RT computerized planning systems. Copyright © 2012 Elsevier Inc. All rights reserved.
Rivera, Juan A; Martorell, Reynaldo; González, Wendy; Lutter, Chessa; Cossío, Teresa González de; Flores-Ayala, Rafael; Uauy, Ricardo; Delgado, Hernán
2011-01-01
To describe the regional master plan of nutrition to address maternal and child malnutrition in a 5- year period developed by the Nutrition Technical Group. The Nutrition Technical Group developed a situation analysis describing the main nutrition problems, policies and programs in Mesoamerica. The situation analysis and a literature review about effective interventions to address malnutrition were conducted to develop a nutrition master plan. The Nutrition Technical Group held various meetings to develop, discuss and validate the master plan. Theory of change identified problems and barriers, the actions to be developed, the changes and impacts expected. A package of interventions is proposed to reduce undernutrition and micronutrient deficiencies useful under different epidemiological contexts. The nutrition master plan provides a guideline of best practices that can be used for evidence-informed decision making and the development of national policies and programs to reduce malnutrition.
A Retrospective on Educational Planning in Comparative Education.
ERIC Educational Resources Information Center
Farrell, Joseph P.
1997-01-01
Defines and broadly traces the history of educational planning in both developing and industrialized capitalist nations. Discusses general approaches to educational planning (technical versus political planning, top-down versus bottom-up planning, and various theoretical bases); the contingency view of planning; case examples of planned,…
Ebert, M A; Blight, J; Price, S; Haworth, A; Hamilton, C; Cornes, D; Joseph, D J
2004-09-01
Digital data from 3-D treatment planning computers is generally used for patient planning and then never considered again. However, such data contains enormous quantities of information regarding patient geometries, tissue outlining, treatment approaches and dose distributions. Were such data accessible from planning systems from multiple manufacturers, there would be substantial opportunities for undertaking quality assurance of radiotherapy clinical trials, prospective assessment of trial outcomes and basic treatment planning research and development. The technicalities of data exchange between planning systems are outlined, and previous attempts at producing systems capable of viewing and/or manipulating imaging and radiotherapy digital data reviewed. Development of a software system for enhancing the quality of Australasian clinical trials is proposed.
Planning satellite communication services and spectrum-orbit utilization
NASA Technical Reports Server (NTRS)
Sawitz, P. H.
1982-01-01
The relationship between approaches to planning satellite communication services and spectrum-orbit utilization is considered, with emphasis on the fixed-satellite and the broadcasting-satellite services. It is noted that there are several possible approaches to planning space services, differing principally in the rigidity with which technical parameters are prescribed, in the time for which a plan remains in force, and in the procedures adopted for implementation and modifications. With some planning approaches, spectrum-orbit utilization is fixed at the time the plan is made. Others provide for greater flexibility by making it possible to postpone some decisions on technical parameters. In addition, the two political questions of what is equitable access and how it can be guaranteed in practice play an important role.
40 CFR 52.2037 - Control strategy plans for attainment and rate-of-progress: Ozone.
Code of Federal Regulations, 2014 CFR
2014-07-01
... and rate-of-progress: Ozone. 52.2037 Section 52.2037 Protection of Environment ENVIRONMENTAL... (CONTINUED) Pennsylvania § 52.2037 Control strategy plans for attainment and rate-of-progress: Ozone. (a... ozone nonattainment area has attained the ozone standard and that the reasonable further progress and...
For Work-Force Training, a Plan to Give College Credit Where It's Due
ERIC Educational Resources Information Center
Sander, Libby
2008-01-01
After nearly three years of planning, Ohio's higher-education officials are finalizing an ambitious program to grant college credit for some technical courses offered at the state's adult-education centers. The program, called the Career-Technical Credit Transfer, is the latest in a string of state efforts to more closely link work-force training…
Strategic Business Plan for Economic Development Contract Services, July 1995-June 1997.
ERIC Educational Resources Information Center
Fox Valley Technical Coll., Appleton, WI.
This plan describes the contract training and technical assistance services provided by Wisconsin's Fox Valley Technical College (FVTC) to area employers, focusing on the status of the services and ways to improve delivery for the July 1995 to June 1997 period. Following an executive summary, the second section focuses on contract services…
TWRS Configuration management program plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-05
... DEPARTMENT OF LABOR Employee Benefits Security Administration 29 CFR Part 2520 Technical Revisions... Alternatives Under Pension Relief Act of 2010 AGENCY: Employee Benefits Security Administration, Labor. ACTION... 5500 Annual Return/Report of Employee Benefit Plan have been adopted in IRS Notice 2010-83 (2010-51 I.R...
ERIC Educational Resources Information Center
Whitehead, Everett
This practicum studies the future educational and/or occupational plans of 223 technical program students enrolled in Brevard Community College (BCC) during the Fall 1973 term in order to suggest adjustments in college procedures to facilitate student transition to continued college or to their chosen professions. The characteristics of technical…
ERIC Educational Resources Information Center
Shelton, John Alton
Designed to help formulate a plan of organization and administration for vocational and technical education and adult education in the Birmingham, Alabama, city schools, this study entailed an extensive literature review on vocational education and administrative matters; a historical review of several Birmingham schools (Paul Hayne School,…
A National Periodicals Center Technical Development Plan.
ERIC Educational Resources Information Center
Council on Library Resources, Inc., Washington, DC.
This technical plan for developing, managing, and operating a national periodicals center (NPC), which was prepared at the request of the Library of Congress, is designed so that it could be used by the Library or any other agency prepared to assume responsibility for the creation of a major periodicals facility. The overall goal of the NPC is to…
Technical Report on Manpower Planning. Technical Group Report No. 7.
ERIC Educational Resources Information Center
Montana Commission on Post-Secondary Education, Helena.
The report is one of a series containing data and recommendations relevant to the task of developing future plans for Montana's post-secondary education. A brief introduction outlines the methods used in gathering information on manpower needs, and is followed by a review and summarization of the data collected, including a description, analysis,…
76 FR 43963 - Regional Haze State Implementation Plan; State of Nevada; Extension of Comment Period
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-22
... deadline for written comments on the proposed approval of the Regional Haze SIP by 30 days to August 22... technical materials that form the basis of Nevada's Regional Haze SIP and EPA's proposed approval. The EPA...'s proposed approval of the technical analyses presented in Nevada's plan. DATES: The comment period...
ERIC Educational Resources Information Center
North Carolina State Dept. of Community Colleges, Raleigh.
One hundred and sixteen lesson plans for a first, second, third and fourth year electrical apprentice technical training program are presented in this manual. The lesson plans are generally organized into four steps: introducing the lesson, presenting the lessons (e.g., demonstration), student application (use of worksheets), and checking and…
ERIC Educational Resources Information Center
Nahleh, Lamis Abu
Gender planning and vocational education and technical training (VETT) in Palestine were examined through the following: review of available literature and policy-oriented reports, discussions with educators in the field, and roundtable discussion in which representatives of the Palestinian Ministry of Education and Ministry of Labor and experts…
40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...
40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?
Code of Federal Regulations, 2011 CFR
2011-07-01
... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...
40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?
Code of Federal Regulations, 2014 CFR
2014-07-01
... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...
1995-06-28
Secondary Reports Dilution Unit, Audit Planning and Technical Support Directorate, at (703) 604-8937 (DSN 664-8937) or FAX (703) 604-8932. Suggestions...for Future Audits To suggest ideas for or to request future audits , contact the Planning and Coordination Branch, Audit Planning and Technical...Defense OAIG-AUD (ATTN: APTS Audit Suggestions) 400 Army Navy Drive (Room 801) Arlington, Virginia 22202-2884 DoD Hotline To report fraud, waste
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1992-01-01
The work under each technical area is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest. The structural dynamics division consist of the following branches: configuration aeroelasticity; unsteady aerodynamics; aeroservoelasticity; landing and impact dynamics; and spacecraft dynamics.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... Promulgation of Implementation Plans; New York Reasonable Further Progress Plans, Emissions Inventories, Contingency Measures and Motor Vehicle Emissions Budgets AGENCY: Environmental Protection Agency (EPA). ACTION... year and 2008 projection year emissions inventories, the 2008 motor vehicle emissions budgets used for...
Developments in Technical Education in the British Caribbean, 1940-60.
ERIC Educational Resources Information Center
Pemberton, S. Macpherson
The paper discusses developments in technical education in the British West Indies from 1940-1960 emphasizing the relation between education and economic development. The objective is to analyze the economic basis of progress in technical education. The document is presented in four chapters. Chapter I summarizes historical background prior to…
Programs of Study: Year 2 Joint Technical Report. Research Snapshot
ERIC Educational Resources Information Center
National Research Center for Career and Technical Education, 2010
2010-01-01
In January 2010, the National Research Center for Career and Technical Education (NRCCTE) issued a progress report on three studies being conducted by the Center that examine the implementation and outcomes of Programs of Study (POS), which were required in the 2006 reauthorization of the federal legislation for career and technical education…
7 CFR 4284.630 - Other considerations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 1940 of this title. Applications for technical assistance or planning projects are generally excluded... within their plans the important environmental factors within the planning area and the potential environmental impacts of the plan on the planning area, as well as the alternative planning strategies that were...
Aerospace Systems Design in NASA's Collaborative Engineering Environment
NASA Technical Reports Server (NTRS)
Monell, Donald W.; Piland, William M.
1999-01-01
Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g. manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.
Aerospace Systems Design in NASA's Collaborative Engineering Environment
NASA Technical Reports Server (NTRS)
Monell, Donald W.; Piland, William M.
2000-01-01
Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operation). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographical distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across Agency.
Aerospace Systems Design in NASA's Collaborative Engineering Environment
NASA Astrophysics Data System (ADS)
Monell, Donald W.; Piland, William M.
2000-07-01
Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often led to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.
Spectrum orbit utilization program technical manual SOUP5 Version 3.8
NASA Technical Reports Server (NTRS)
Davidson, J.; Ottey, H. R.; Sawitz, P.; Zusman, F. S.
1984-01-01
The underlying engineering and mathematical models as well as the computational methods used by the SOUP5 analysis programs, which are part of the R2BCSAT-83 Broadcast Satellite Computational System, are described. Included are the algorithms used to calculate the technical parameters and references to the relevant technical literature. The system provides the following capabilities: requirements file maintenance, data base maintenance, elliptical satellite beam fitting to service areas, plan synthesis from specified requirements, plan analysis, and report generation/query. Each of these functions are briefly described.
30 CFR 777.13 - Reporting of technical data.
Code of Federal Regulations, 2010 CFR
2010-07-01
... descriptions of the methodology used to collect and analyze the data. (b) Technical analyses shall be planned... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reporting of technical data. 777.13 Section 777... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
... impact. EPA stated that the state's conclusion should be supported by an adequate technical analysis. EPA... by an adequate technical analysis. IDEM did not provide a technical analysis in its submittal, but... technical analysis and justification necessary to make that demonstration. Indiana did not provide any...
IMPLICATIONS OF WOMEN'S WORK PATTERNS FOR PROGRAM DEVELOPMENT IN VOCATIONAL AND TECHNICAL EDUCATION.
ERIC Educational Resources Information Center
LEE, SYLVIA L.; AND OTHERS
THE IMPLICATIONS OF WOMEN'S LABOR FORCE PARTICIPATION FOR EDUCATORS AND LEADERS PLANNING PROGRAMS IN VOCATIONAL AND TECHNICAL EDUCATION WERE DERIVED AT A 2-DAY CONFERENCE BY 30 PEOPLE REPRESENTING THE VARIOUS SERVICES IN VOCATIONAL-TECHNICAL EDUCATION AND RELATED AREAS. IMPLICATIONS AND RECOMMENDATIONS FOR VOCATIONAL AND TECHNICAL EDUCATION…
Proceedings: Computer Science and Data Systems Technical Symposium, volume 1
NASA Technical Reports Server (NTRS)
Larsen, Ronald L.; Wallgren, Kenneth
1985-01-01
Progress reports and technical updates of programs being performed by NASA centers are covered. Presentations in viewgraph form are included for topics in three categories: computer science, data systems and space station applications.
The Space Science Enterprise Strategic Plan
NASA Technical Reports Server (NTRS)
2000-01-01
It is a pleasure to present our new Space Science Strategic Plan. It represents contributions by hundreds of members of the space science community, including researchers, technologists, and educators, working with staff at NASA, over a period of nearly two years. Our time is an exciting one for space science. Dramatic advances in cosmology, planetary research, and solar-terrestrial science form a backdrop for this ambitious plan. Our program boldly addresses the most fundamental questions that science can ask: (1) how the universe began and is changing, (2) what are the past and future of humanity, and (3) whether we are alone. In taking up these questions, researchers and the general public--for we are all seekers in this quest--will draw upon all areas of science and the technical arts. Our Plan outlines how we will communicate our findings to interested young people and adults. The program that you will read about in this Plan includes forefront research and technology development on the ground as well as development and operation of the most complex spacecraft conceived. The proposed flight program is a balanced portfolio of small missions and larger spacecraft. Our goal is to obtain the best science at the lowest cost, taking advantage of the most advanced technology that can meet our standards for expected mission success. In driving hard to achieve this goal, we experienced some very disappointing failures in 1999. But NASA, as a research and development agency, makes progress by learning also from mistakes, and we have learned from these.
Criteria and Planning Guidance for Ex-Plant Harvesting to Support Subsequent License Renewal
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramuhalli, Pradeep; Devanathan, Ram; Meyer, Ryan M.
As U.S. nuclear power plants look to subsequent license renewal (SLR) to operate for a 20-year period beyond 60 years, the U.S. Nuclear Regulatory Commission and the industry will be addressing technical issues around the capability of long-lived passive components to meet their functionality objectives. A key challenge will be to better understand likely materials degradation mechanisms in these components and their impacts on component functionality and margins to safety. Research addressing many of the remaining technical gaps in these areas for SLR may greatly benefit from materials sampled from plants (decommissioned or operating). Because of the cost and inefficiencymore » of piecemeal sampling, there is a need for a strategic and systematic approach to sampling materials from structures, systems, and components (SSC) in both operating and decommissioned plants. This document describes a potential approach for sampling (harvesting) materials that focuses on prioritizing materials for sampling using a number of criteria. These criteria are based on an evaluation of technical gaps identified in the literature, research needs to address these technical gaps, and lessons learned from previous harvesting campaigns. The document also describes a process for planning future harvesting campaigns; such a plan would include an understanding of the harvesting priorities, available materials, and the planned use of the materials to address the technical gaps.« less
Towards a Mars base - Critical steps for life support on the moon and beyond
NASA Technical Reports Server (NTRS)
Rummel, John D.
1992-01-01
In providing crew life support for future exploration missions, overall exploration objectives will drive the life support solutions selected. Crew size, mission tasking, and exploration strategy will determine the performance required from life support systems. Human performance requirements, for example, may be offset by the availability of robotic assistance. Once established, exploration requirements for life support will be weighed against the financial and technical risks of developing new technologies and systems. Other considerations will include the demands that a particular life support strategy will make on planetary surface site selection, and the availability of precursor mission data to support EVA and in situ resource recovery planning. As space exploration progresses, the diversity of life support solutions that are implemented is bound to increase.
Research and Development of Large Capacity CFB Boilers in TPRI
NASA Astrophysics Data System (ADS)
Xianbin, Sun; Minhua, Jiang
This paper presents an overview of advancements of circulating fluidized bed (CFB) technology in Thermal Power Research Institute (TPRI),including technologies and configuration and progress of scaling up. For devoloping large CFB boiler, the CFB combustion test facilities have been established, the key technologies of large capacity CFB boiler have been research systematically, the 100MW ˜330MW CFB boiler have been developed and manufactured. The first domestically designed 100MW and 210MW CFB boiler have been put into commericial operation and have good operating performance. Domestic 330MW CFB boiler demonstration project also has been put into commericial operation,which is H type CFB boiler with Compact heat exchanger. This boiler is China's largest CFB boiler. The technical plan of domestic 600MW supercritical CFB boiler are also briefly introduced.
Distributed photovoltaic systems: Utility interface issues and their present status
NASA Technical Reports Server (NTRS)
Hassan, M.; Klein, J.
1981-01-01
Major technical issues involving the integration of distributed photovoltaics (PV) into electric utility systems are defined and their impacts are described quantitatively. An extensive literature search, interviews, and analysis yielded information about the work in progress and highlighted problem areas in which additional work and research are needed. The findings from the literature search were used to determine whether satisfactory solutions to the problems exist or whether satisfactory approaches to a solution are underway. It was discovered that very few standards, specifications, or guidelines currently exist that will aid industry in integrating PV into the utility system. Specific areas of concern identified are: (1) protection, (2) stability, (3) system unbalance, (4) voltage regulation and reactive power requirements, (5) harmonics, (6) utility operations, (7) safety, (8) metering, and (9) distribution system planning and design.
Ford, Andrew Q; Touchette, Nancy; Hall, B Fenton; Hwang, Angela; Hombach, Joachim
2016-03-18
The World Health Organization, the National Institute of Allergy and Infectious Diseases, part of the National Institutes of Health, and the Bill & Melinda Gates Foundation convened the first Global Vaccine and Immunization Research Forum (GVIRF) in March 2014. This first GVIRF aimed to track recent progress of the Global Vaccine Action Plan research and development agenda, identify opportunities and challenges, promote partnerships in vaccine research, and facilitate the inclusion of all stakeholders in vaccine research and development. Leading scientists, vaccine developers, and public health officials from around the world discussed scientific and technical challenges in vaccine development, research to improve the impact of immunization, and regulatory issues. This report summarizes the discussions and conclusions from the forum participants. Copyright © 2016. Published by Elsevier Ltd.. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Montellano, B.O. de
1996-11-14
This progress report summarizes results of a teacher workshop. A letter sent to 17 teachers who had participated in the workshop requested a report of any activities undertaken and copies of lesson plans and materials developed. Only nine responses were received, and not all of them demonstrated a satisfactory level of activity. Teachers who submitted materials showing the most promise were invited to participate in the Summer Writing Workshop. A partial first draft of a companion volume for the teacher`s manual was written which provides a rationale for culturally relevant science and presents the cultural and scientific background needed. Themore » outline of the book is presented in Appendix 1. Appendix 2 is a sample chapter from the book.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE SUPPORT ACTIVITIES TECHNICAL SERVICE PROVIDER ASSISTANCE General Provisions § 652.2 Definitions... public agencies certified by NRCS to provide technical services to a participant. Certification means the... technical service for conservation planning or a specific conservation practice or system; or (2) An entity...
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
ERIC Educational Resources Information Center
North Carolina State Dept. of Community Colleges, Raleigh.
Twenty-seven lesson plans for a fourth-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized into four steps:…
ERIC Educational Resources Information Center
Colombo Plan Bureau (Sri Lanka).
Proceedings of the Sixth Colloquium on Intra-Regional Technical Training sponsored jointly by the Colombo Plan and the Government of Malaysia are presented in this report. Four working papers are presented centered around three main areas of concern: influence of technical education on economic development; how the status of technicians could be…
ERIC Educational Resources Information Center
North Carolina State Dept. of Community Colleges, Raleigh.
Thirty-six lesson plans for the first of a four-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized into…
ERIC Educational Resources Information Center
North Carolina State Dept. of Community Colleges, Raleigh.
Twenty-eight lesson plans for the second year of a four-year electrical apprentice technical training program are presented in this instructor's manual. Also included are student worksheets and information sheets for each lesson, and copies of unit tests. (Answers to the worksheets and tests are provided.) The lesson plans are generally organized…
Strategic Mobility 21 Project Management Plan
2006-09-29
California Association of Governments (SCAG), and other stakeholders to transform the former military installation into a modern in-land distribution node... governments , including adversary governments , and may be exported. c. This statement may not be used on technical documents that formerly were...required updates of both the ICD and the Technical Plan. SM21 has established a consortium of public and private, governmental and non
ERIC Educational Resources Information Center
Martin, Nancy
Presented is a technical report concerning the use of a mathematical model describing certain aspects of the duplication and selection processes in natural genetic adaptation. This reproductive plan/model occurs in artificial genetics (the use of ideas from genetics to develop general problem solving techniques for computers). The reproductive…
ERIC Educational Resources Information Center
Wedderburn, Dorothy
Forty case studies made by research teams of independents or governmental agencies in Austria, Canada, France, Germany, Norway, Sweden, United Kingdom, and the United States were analyzed to provide managements and trade unions with illustrations of present systems of technical and manpower changes at the enterprise level and to describe the…
Vagi, Sara J.; Reinold, Chris M.; Silverman, Brenda L.; Avchen, Rachel N.
2017-01-01
Objectives. To evaluate and describe outcomes of state and local medical countermeasure preparedness planning, which is critical to ensure rapid distribution and dispensing of a broad spectrum of life-saving medical assets during a public health emergency. Methods. We used 2007 to 2014 state and local data collected from the Centers for Disease Control and Prevention’s Technical Assistance Review. We calculated descriptive statistics from 50 states and 72 local Cities Readiness Initiative jurisdictions that participated in the Technical Assistance Review annually. Results. From 2007 to 2014, the average overall Technical Assistance Review score increased by 13% for states and 41% for Cities Readiness Initiative jurisdictions. In 2014, nearly half of states achieved the maximum possible overall score (100), and 94% of local Cities Readiness Initiative jurisdictions achieved a score of 90 or more. Conclusions. Despite challenges, effective and timely medical countermeasure distribution and dispensing is possible with appropriate planning, staff, and resources. However, vigilance in training, exercising, and improving plans from lessons learned in a sustained, coordinated way is critical to ensure continued public health preparedness success. PMID:28892441
Technical progress in silicon sheet growth under DOE/JPL FSA program, 1975-1986
NASA Technical Reports Server (NTRS)
Kalejs, J. P.
1986-01-01
The technical progress made in the Silicon Sheet Growth Program during its 11 years was reviewed. At present, in 1986, only two of the original 9 techniques have survived to the start-up, pilot-plant stage in industry. These two techniques are the edge-defined, film-fed growth (EFG) technique that produces closed shape polygons, and the WEB dendritic technique that produces single ribbons. Both the status and future concerns of the EFG and WEB techniques were discussed.
1991-01-24
Molecular Graphics, vol. 6, No. 4 (Dec. 1988), p. 223. Turk, Greg, "Interactive Collision Detection for Molecular Graphics," M.S. thesis , UNC-Chapel Hill...Problem," Master’s thesis , UNC Department of Computer Science Technical Report #TR87-013, May 1987. Pique, ME., "Technical Trends in Molecular Graphics...AD-A236 598 Seventeenth Annual Progress Report and 1992-97 Renewal Proposal Interactive Graphics for Molecular Studies TR91-020 January 24, 1991 red
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fortmann, R.G.; Walker, J.P.
1993-07-10
Sierra Energy Company`s targeted goals during the third quarter of this Cooperative Agreement included the following objectives from the Statement of Work: in Phase 2A, completion of subtask 2.1.2--acquire best possible field data in the 3-D seismic program; and initiation of Subtask 2.1.3--process acquired 3-D seismic data. Technical progress is described for these tasks.