Sample records for planned construction work

  1. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  2. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  3. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  4. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  5. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  6. 7 CFR 761.10 - Planning and performing construction and other development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 7 2011-01-01 2011-01-01 false Planning and performing construction and other... Provisions § 761.10 Planning and performing construction and other development. (a) Purpose. This section describes Agency policies regarding the planning and performing of construction and other development work...

  7. 7 CFR 1710.251 - Construction work plans-distribution borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Construction work plans-distribution borrowers. 1710...—distribution borrowers. (a) All distribution borrowers must maintain a current CWP approved by their board of directors covering all new construction, improvements, replacements, and retirements of distribution and...

  8. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    NASA Astrophysics Data System (ADS)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  9. Managing the construction bidding process : a move to simpler construction plan sets

    DOT National Transportation Integrated Search

    2001-01-31

    This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...

  10. Facility Planning in the Construction Grants Program. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Buskirk, E. Drannon, Jr.; Cole, Charles A.

    Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…

  11. 4D modeling in high-rise construction

    NASA Astrophysics Data System (ADS)

    Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly

    2018-03-01

    High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  12. Earthworks logistics in the high density urban development conditions - case study

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Blajer, M.

    2017-10-01

    Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.

  13. 7 CFR 1710.255 - Energy efficiency work plans-energy efficiency borrowers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Energy efficiency work plans-energy efficiency... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.255 Energy efficiency work plans—energy efficiency borrowers. (a) All energy efficiency borrowers must maintain a...

  14. 24 CFR 990.145 - Dwelling units with approved vacancies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... work, and the construction is on schedule according to a HUD-approved PHA Annual Plan; or (ii) The unit... PHA Annual Plan, but the time period for placing the vacant unit under construction has not yet expired. The PHA shall place the vacant unit under construction within two federal fiscal years (FFYs...

  15. 7 CFR Exhibit F to Subpart A of... - Payment Bond

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Construction and Other Development Pt. 1924, Subpt... _______ day of ________19__, a copy of which is hereto attached and made a part hereof for the construction of... connection with the construction of such WORK, and for all labor cost incurred in such WORK including that by...

  16. Planning for Safety on the Jobsite. Safety in Industry, Construction Industry Series.

    ERIC Educational Resources Information Center

    Occupational Safety and Health Administration, Washington, DC.

    Work injuries and their monetary losses in the construction industry can be effectively prevented only through an aggressive and well-planned safety effort. The purpose of this bulletin is to provide guidelines to aid the construction contractor in complying with legal requirements and in attaining the objective of keeping costly accidents and…

  17. PLANNING FOR SAFETY ON THE JOBSITE. SAFETY IN INDUSTRY--CONSTRUCTION INDUSTRY SERIES.

    ERIC Educational Resources Information Center

    OTTO, FRANCIS L.; VAN ATTA, F.A.

    WORK INJURIES AND THEIR MONETARY LOSSES IN THE CONSTRUCTION INDUSTRY CAN BE EFFECTIVELY PREVENTED ONLY THROUGH AN AGGRESSIVE AND WELL-PLANNED SAFETY EFFORT. THIS BULLETIN DISCUSSES THE "HOW" OF PLANNING FOR SAFETY ON THE JOBSITE. IT WAS PREPARED IN THE DIVISION OF PROGRAMING AND RESEARCH, OFFICE OF OCCUPATIONAL SAFETY. CONTENTS INCLUDE (1) THE…

  18. Traffic incident management in construction and maintenance work zones.

    DOT National Transportation Integrated Search

    2009-01-01

    In 2004, the Federal Highway Administration published updated rules governing work zone safety and mobility; all highway construction and maintenance projects using federal-aid highway funds are required to develop transportation management plans (TM...

  19. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for...

  20. School Working Conditions and Changes in Student Teachers' Planned Persistence in Teaching

    ERIC Educational Resources Information Center

    Shirrell, Matthew; Reininger, Michelle

    2017-01-01

    This study examines the relationship between the working conditions of student teaching schools and changes in student teachers' planned persistence in teaching. Planned persistence (and a related construct, initial commitment) is an important predictor of initial entry (Rots, Aelterman, Vlerick, & Vermeulen, 2007) and actual persistence in…

  1. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality management planning. Before grant assistance can be awarded for any treatment works project, the Regional... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35...

  2. CasCADe: A Novel 4D Visualization System for Virtual Construction Planning.

    PubMed

    Ivson, Paulo; Nascimento, Daniel; Celes, Waldemar; Barbosa, Simone Dj

    2018-01-01

    Building Information Modeling (BIM) provides an integrated 3D environment to manage large-scale engineering projects. The Architecture, Engineering and Construction (AEC) industry explores 4D visualizations over these datasets for virtual construction planning. However, existing solutions lack adequate visual mechanisms to inspect the underlying schedule and make inconsistencies readily apparent. The goal of this paper is to apply best practices of information visualization to improve 4D analysis of construction plans. We first present a review of previous work that identifies common use cases and limitations. We then consulted with AEC professionals to specify the main design requirements for such applications. These guided the development of CasCADe, a novel 4D visualization system where task sequencing and spatio-temporal simultaneity are immediately apparent. This unique framework enables the combination of diverse analytical features to create an information-rich analysis environment. We also describe how engineering collaborators used CasCADe to review the real-world construction plans of an Oil & Gas process plant. The system made evident schedule uncertainties, identified work-space conflicts and helped analyze other constructability issues. The results and contributions of this paper suggest new avenues for future research in information visualization for the AEC industry.

  3. 7 CFR 1726.18 - Preloan contracting.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.18 Preloan contracting... if a construction work plan, general funds, loan or loan guarantee for the proposed work has not been approved. While the RUS staff will work with the borrower in such circumstances, nothing contained in this...

  4. Business Planning as Pedagogy: Language and Control in a Changing Institutional Field.

    ERIC Educational Resources Information Center

    Oakes, Leslie S.; Townley, Barbara; Cooper, David J.

    1998-01-01

    Based on Pierre Bourdieu's work on power as symbolic violence, examines business planning's pedagogical function in Alberta, Canada's museum and cultural heritage sites. Control involves redirecting work and changing producers' identity and work understandings via construction of markets, consumers, and products. Control was achieved by pedagogic…

  5. 7 CFR 1710.120 - Construction standards and contracting.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE GENERAL AND PRE-LOAN POLICIES AND PROCEDURES COMMON TO ELECTRIC LOANS AND GUARANTEES Loan Purposes and Basic Policies § 1710.120 Construction standards and contracting. Borrowers shall follow all RUS requirements regarding construction work plans, construction standards...

  6. 7 CFR 1924.101 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.101 Purpose. This subpart establishes the basic Rural Housing Service (RHS) policies for planning and performing site development work...

  7. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  8. 7 CFR 1753.94 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... accept the certification only for matters within the staff engineer's area of specialization. In such... certification coordinator. (b) Certification borrowers, shall submit and obtain RUS approval of a work plan before construction and related engineering begin. (1) The work plan shall provide a description of the...

  9. Research on the Intensity Analysis and Result Visualization of Construction Land in Urban Planning

    NASA Astrophysics Data System (ADS)

    Cui, J.; Dong, B.; Li, J.; Li, L.

    2017-09-01

    As a fundamental work of urban planning, the intensity analysis of construction land involves many repetitive data processing works that are prone to cause errors or data precision loss, and the lack of efficient methods and tools to visualizing the analysis results in current urban planning. In the research a portable tool is developed by using the Model Builder technique embedded in ArcGIS to provide automatic data processing and rapid result visualization for the works. A series of basic modules provided by ArcGIS are linked together to shape a whole data processing chain in the tool. Once the required data is imported, the analysis results and related maps and graphs including the intensity values and zoning map, the skyline analysis map etc. are produced automatically. Finally the tool is installation-free and can be dispatched quickly between planning teams.

  10. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  11. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  12. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  13. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-9 Revision or amendment of facilities plan. A facilities plan may provide the basis...

  14. 7 CFR 1924.12 - Warranty of development work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Warranty of development work. 1924.12 Section 1924.12 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Construction and Other Development § 1924.12...

  15. Shale embankment construction criteria : experimental feature interim report.

    DOT National Transportation Integrated Search

    1985-06-01

    The research was conducted in the summer of 1983 during the realignment construction of the Mystic Creek - Camas Valley section on the Coos Bay - Roseburg Highway. Construction is still in progress. As outlined in the experimental features work plan ...

  16. The Industrial Perspective

    DTIC Science & Technology

    1989-09-01

    projections of planned construction, overhaul and repair work from both the public and commercial sectors can never sustain the industry at a level which...and other government organizations to support the Shipyard Recovery Plan and the revitalization of commercial shipbuilding in America. Expanding...engineer sitting next to the organization that does work package planning on ships and from the fleet. It won’t be, at least in these competitive firms

  17. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  18. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  19. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  20. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...

  1. Guidance for Preparing a Facility Plan. Revised Edition.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document provides information to assist with preparing a preliminary facility plan for construction of municipal sewage treatment works. The text describes the requirements in the applicable laws and regulations and suggests a planning process by which they can be met. (CS)

  2. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  3. 7 CFR 1710.205 - Minimum approval requirements for all load forecasts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...

  4. 7 CFR 1710.205 - Minimum approval requirements for all load forecasts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...

  5. 7 CFR 1710.205 - Minimum approval requirements for all load forecasts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...

  6. 36 CFR 327.30 - Shoreline Management on Civil Works Projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...

  7. Industry Studies 2002: Construction

    DTIC Science & Technology

    2002-01-01

    Jacksonville, FL Rotary Club of San Juan, San Juan, PR Tren Urbano Subway Project, San Juan, PR U.S. Army South, San Juan, PR U.S. Coast Guard Housing Project...Bechtel Corporation (IBM Plant Construction Site), Shanghai American Chamber of Commerce, Shanghai Urban Planning Exhibit, Shanghai 3 INTRODUCTION The...of states have or are working on a statewide or agency-wide privatization plan , including California, Maryland, Massachusetts, Michigan and

  8. STUDY ON THE REDUCTION MEASURES OF ENVIRONMENTAL LOADS AT THE DESIGNING AND CONSTRUCTION STAGES OF THE RIVER WORKS

    NASA Astrophysics Data System (ADS)

    Ikeda, Tetsuya; Amano, Kunihiko; Kishida, Hiroyuki

    In the field of infrastructure construction including river works, construction materials such as concrete are used, and it needs to transport them for the long distance. Due to recent growth of public awareness on the environmental issues, it becomes more important to estimate and reduce the environmental loads brought by the infrastructure construction. In the infrastructure construction, it is necessary to take notice of carbon dioxide and waste materials as the broad-based and long-range environmental loads. On the other hand, it is necessary to conduct the quantitative evaluation on these environmental loads and to investigate the reduction measures by considering the actual situation of construction. Focusing on the river works, this paper estimates the cost of construction, the carbon dioxide emission and final disposal volume on the several alternative plans at the designing stage, compares the significance of different environmental loads by using the integrated factors of LIME2, and analyzes the effectiveness of reduction measures. It also establishes the reduction scenarios of the environmental loads, and analyzes the effectiveness compared to the base-line scenario in which the materials are newly extracted and produced. Based on the results, it establishes the procedure intending to reduce the environmental loads at the time of river planning and construction, which will be referentialized by river managers, construction consultants and constructors nationwide.

  9. The NIOSH Construction Program: research to practice, impact, and developing a National Construction Agenda.

    PubMed

    Gillen, Matt

    2010-06-01

    The U.S. National Institute for Occupational Safety and Health (NIOSH) conducts research to improve and protect the health and safety of workers. This paper describes the experience of the NIOSH Construction Program with two recent program planning initiatives intended to improve the program: (a) an independent external review of work over the past decade and (b) the development of strategic goals organized into a "National Construction Agenda" to guide a decade of future work. These goals, developed with input from construction industry stakeholders and researchers, are a part of the NIOSH National Occupational Research Agenda (NORA) initiative. The NORA goals are intended to provide an ambitious set of goals for all construction stakeholders to work together on. Both efforts relate to insuring the relevance and impact of research, reflecting an emerging policy perspective that research programs should be judged not just by the quality and quantity of science produced, but by the industry impact and tangible benefit resulting from the research. This paper describes how views on research planning have evolved to incorporate lessons learned about how research leads to improved safety and health for workers. It also describes the process used to develop the goals and the resulting strategic and intermediate goals that comprise the National Construction Agenda. (c) 2010 Elsevier Ltd. All rights reserved.

  10. 18 CFR 12.23 - Time for filing emergency action plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... might endanger construction workers or otherwise endanger public health or safety, a temporary... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS Emergency Action Plans § 12.23 Time for filing emergency action plan. (a...

  11. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  12. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  13. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  14. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-8 Submission and approval of facilities plan. The State agency must submit the...

  15. Oregon Department of Transportation research leader : fall 2008.

    DOT National Transportation Integrated Search

    2008-01-01

    The newsletter includes: : 1) To ensure safe travel through construction work zones, Traffic Control Plans (TCPs) are developed to communicate required traffic control measures to the construction team. The quality of the design and implementation of...

  16. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  17. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  18. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  19. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  20. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  1. School Facilities Planning. Research Report Number 1974-2.

    ERIC Educational Resources Information Center

    National School Boards Association, Washington, DC.

    Literature reviewed in this report is intended to help school boards reconsider conventional approaches to school facilities planning. A blueprint is presented for good relationships between decision-makers and architects, explaining a sequence for the planning and construction process and the roles each party should fulfill to work successfully.…

  2. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35.2102 Section 35.2102 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality management planning. Before grant...

  3. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1...

  4. London 2012: occupational health in the construction programme.

    PubMed

    Waterman, Lawrence

    2007-05-01

    This article explores the approach to occupational health in the UK construction industry in both broad and narrow contexts. The construction programme for the 2012 Olympic Games and Paralympic Games includes the creation of a large urban park in east London containing many sports venues and served by enhanced infrastructure. The Olympic Delivery Authority (ODA), responsible for the construction programme, is developing plans that seek to assure the health of the thousands of workers who will be engaged in this work. Such plans are not being drafted in a vacuum. In addition to considerable consultation with stakeholders the ODA is also drawing on some of the exciting work that has been undertaken in occupational health in recent years. In particular, the move from a focus on technical health services provided by 'experts' to an acceptance that health issues should be managed within employing organizations. Understanding this broad context provides a solid basis for analysing the specific proposals for occupational support during the Olympic Park construction.

  5. Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading

    NASA Astrophysics Data System (ADS)

    Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.

    2012-12-01

    Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.

  6. 11. Photographic copy of copy of Twin Lakes Outlet Works ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of copy of Twin Lakes Outlet Works construction drawing dated January 15, 1951. Drawn by W.A. Doe for the Twin Lakes Reservoir and Canal Co. (copy in possession of Bureau of Reclamation, location of original unknown) 'AS CONSTRUCTED' PLANS OF 1949-1950, REHABILITATION OF TWIN LAKES RESERVOIR OUTLET WORKS, DETAILS OF UPSTREAM WING WALLS. - Twin Lakes Dam & Outlet Works, Beneath Twin Lakes Reservoir, T11S, R80W, S22, Twin Lakes, Lake County, CO

  7. 12. Photographic copy of copy of Twin Lakes Outlet Works ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photographic copy of copy of Twin Lakes Outlet Works construction drawing dated January 15, 1951. Drawn by W.A. Doe for the Twin Lakes Reservoir and Canal Co. (copy in possession of Bureau of Reclamation, location of original unknown) 'AS CONSTRUCTED' PLANS OF 1949-50, REHABILITATION OF TWIN LAKES RESERVOIR OUTLET WORKS, DETAILS OF DISCHARGE BASIN. - Twin Lakes Dam & Outlet Works, Beneath Twin Lakes Reservoir, T11S, R80W, S22, Twin Lakes, Lake County, CO

  8. Safety in construction--a comprehensive description of the characteristics of high safety standards in construction work, from the combined perspective of supervisors and experienced workers.

    PubMed

    Törner, Marianne; Pousette, Anders

    2009-01-01

    The often applied engineering approach to safety management in the construction industry needs to be supplemented by organizational measures and measures based on how people conceive and react to their social environment. This requires in-depth knowledge of the broad preconditions for high safety standards in construction. The aim of the study was to comprehensively describe the preconditions and components of high safety standards in the construction industry from the perspective of both experienced construction workers and first-line managers. Five worker safety representatives and 19 first-line managers were interviewed, all strategically selected from within a large Swedish construction project. Phenomenographic methodology was used for data acquisition and analysis and to categorize the information. Nine informants verified the results. The study identified four main categories of work safety preconditions and components: (1) Project characteristics and nature of the work, which set the limits of safety management; (2) Organization and structures, with the subcategories planning, work roles, procedures, and resources; (3) Collective values, norms, and behaviors, with the subcategories climate and culture, and interaction and cooperation; and (4) Individual competence and attitudes, with the subcategories knowledge, ability and experience, and individual attitudes. The results comprehensively describe high safety standards in construction, incorporating organizational, group, individual, and technical aspects. High-quality interaction between different organizational functions and hierarchical levels stood out as important aspects of safety. The results are discussed in relation to previous research into safety and into the social-psychological preconditions for other desired outcomes in occupational settings. The results can guide construction companies in planning and executing construction projects to a high safety standard.

  9. Georgia Institute of Technology chilled water system evaluation and master plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-05-15

    As the host of the Olympic Village for the 1996 Atlanta Olympics, Georgia Tech has experienced a surge in construction activities over the last three years. Over 1.3 million square feet of new buildings have been constructed on the Georgia Tech campus. This growth has placed a strain on the Georgia Tech community and challenged the facilities support staff charged with planning and organizing utility services. In concert with Olympic construction, utility planners have worked to ensure long term benefits for Georgia Tech facilities while meeting the short term requirements of the Olympic Games. The concentration of building construction inmore » the northwest quadrant of the campus allowed planners to construct a satellite chilled water plant to serve the needs of this area and provide the opportunity to integrate this section of the campus with the main campus chilled water system. This assessment and master plan, funded in part by the US Department of Energy, has evaluated the chilled water infrastructure at Georgia Tech, identified ongoing problems and made recommendations for long term chilled water infrastructure development and efficiency improvements. The Georgia Tech office of Facilities and RDA Engineering, Inc. have worked together to assemble relevant information and prepare the recommendations contained in this document.« less

  10. PK-12 Public Educational Facilities Master Plan Evaluation Guide

    ERIC Educational Resources Information Center

    21st Century School Fund, 2011

    2011-01-01

    Proper planning of school facilities is critical for all school districts no matter how large or small, whether major construction is in the works or the district is managing enrollment declines. When school districts properly plan for their school facilities they have better schools, more public use and higher value for public spending. This…

  11. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management planning. 35.2023 Section 35.2023 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality management planning. (a) From funds...

  12. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...

  13. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...

  14. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management plans and... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with...

  15. 7 CFR 1710.250 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... (i) A borrower's CWP or special engineering studies must be supported by a Borrower's Environmental..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range...

  16. Army Corps of Engineers: Better Guidance Could Improve Corps’ Information on Water Resources Projects Undertaken by Nonfederal Sponsors

    DTIC Science & Technology

    2016-12-01

    Nonfederal Sponsors Why GAO Did This Study Through its Civil Works program, the Corps designs , constructs, and maintains federal water resources...Public Works United States Senate Dear Mr. Chairman: The U.S. Army Corps of Engineers (Corps) is the world’s largest public engineering, design ...its Civil Works Program, in general, the Corps plans, designs , constructs, operates, and maintains a wide range of water resources projects. Congress

  17. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  18. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  19. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  20. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  1. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  2. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  3. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  4. Course Outline for Lesson Plans for Pre-Employment Laboratory Training in CVAE-VEH Farm and Ranch Mechanical Repair.

    ERIC Educational Resources Information Center

    Texas A and M Univ., College Station. Vocational Instructional Services.

    This packet contains 88 lesson plans for a laboratory course in farm and ranch mechanical repair. The lesson plans are organized into six units covering the following topics: occupational information, construction and maintenance (safety, farm carpentry, farm water supply and sanitation, farm electricity, concrete), hot metal work (oxyacetylene…

  5. Co-Teacher Perceptions of Lesson Planning in the Online Scripted Math Curriculum Inclusion Classroom

    ERIC Educational Resources Information Center

    Pollock, Joseph

    2017-01-01

    The purpose of this qualitative single case embedded exploratory case study was to investigate high school inclusion co-teachers' perceptions of the shared planning process when developing lesson plans for "Agile Mind" (2015) and to determine how teachers work to do this within the constructs of the online scripted curriculum. The…

  6. Perception of Construction Participants in Construction delays: A case study in Tamilnadu, India.

    NASA Astrophysics Data System (ADS)

    Rathinakumar, V.; Vignesh, T.; Dhivagar, K.

    2017-07-01

    Delays in the construction industry are universal fact, which affects the construction participants. The research work spotlights on determining the prevailing delays in the cities of Tamil Nadu, as perceived by the participants. After a few field level interactions, a questionnaire was framed and administered to the participants i.e., Consultants (50 Nos.), contractors (50 Nos.) and clients (150 Nos.) to understand their perception on the causes of delays. The factors for delay was categorized into 4 groups say Improper project planning, Design related issues, Finance related issues and Resource related issues. The responses were analysed using the SPSS software by applying ANOVA and Regression analysis. From the analysis, it was found that the personal financial problems of the client dominantly affect the entire construction progress and the subsequent design changes by the clients, Inadequate early project planning, labour related issues. Also, the delay groups were found to be the improper project planning and the Resource related issues.

  7. 7 CFR 1710.251 - Construction work plans-distribution borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... generation facilities; (11) Load management equipment, automatic sectionalizing facilities, and centralized... transmission plant, and improvements replacements, and retirements of any generation plant. Construction of new generation capacity need not be included in a CWP but must be specified and supported by specific engineering...

  8. 187. Photographic copy of original construction drawing dated October 20, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    187. Photographic copy of original construction drawing dated October 20, 1932 (from Record Group 115, Denver Branch of the National Archives, Denver). TUNNEL NO. 1 CONTROLLING WORKS; GENERAL PLAN AND SECTIONS-LOCATION MAP. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  9. Safety assessment tool for construction zone work phasing plans

    DOT National Transportation Integrated Search

    2016-05-01

    The Highway Safety Manual (HSM) is the compilation of national safety research that provides quantitative methods for : analyzing highway safety. The HSM presents crash modification functions related to freeway work zone characteristics such as : wor...

  10. Analysis and preliminary design of Kunming land use and planning management information system

    NASA Astrophysics Data System (ADS)

    Li, Li; Chen, Zhenjie

    2007-06-01

    This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.

  11. 40 CFR 35.2030 - Facilities planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2030 Facilities planning. (a... ponds, trickling filters, oxidation ditches, or overland-flow land treatment; and for unsewered portions... a schedule the State accepts and such schedule is inserted as a special condition of the grant...

  12. 14. "SITE WORK, CIVIL, SITE PLAN." Test Area 1120. Specifications ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. "SITE WORK, CIVIL, SITE PLAN." Test Area 1-120. Specifications No. OC2-55-72; Drawing No. 60-09-12; sheet 7 of 148; file no. 1320/58, Rev. C. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338 Rev. C, Date: 16 April 1957. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Leuhman Ridge near Highways 58 & 395, Boron, Kern County, CA

  13. DCSC (Defense Construction Supply Center) Total Quality Management Master Plan

    DTIC Science & Technology

    1989-07-01

    job while allowing them to establish a better balance between work and personal needs. 29 TQM SHORT-MID-LONG RANGE INITIATIVES MID RANGE (3 YEARS...all performance standards. IMPROVE THE QUALITY OF WORKLIFE - Projects requiring engineering support throughout FY 90 and beyond are: Construction of

  14. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 35.917-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary...

  15. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 35.917-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary...

  16. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  17. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  18. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  19. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  20. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  1. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917... the most economical means of meeting established effluent and water quality goals while recognizing... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3...

  2. 40 CFR 35.917 - Facilities planning (step 1).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917... the most economical means of meeting established effluent and water quality goals while recognizing... projection totals and disaggregations in approved water quality management (WQM) plans. (See paragraph 8a(3...

  3. 77 FR 71573 - Notice of Request for Extension of a Currently Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... Housing and Community Programs, Business and Cooperative Programs, Utility Programs, to request an... planning and performing construction and other development work. DATES: Comments on this notice must be... [email protected] . SUPPLEMENTARY INFORMATION: Title: RD 1924-A, ``Planning and Performing...

  4. 23 CFR 635.120 - Changes and extra work.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.120 Changes and extra work. (a) Following authorization to proceed with a project, all major changes in the plans and contract provisions and all major extra... to what constitutes a non-major change and non-major extra work. (c) Changes in contract time, as...

  5. Careers Canada. Volume 1, Careers in Construction.

    ERIC Educational Resources Information Center

    Department of Manpower and Immigration, Ottawa (Ontario).

    This pamphlet, published by the Canadian Department of Manpower and Immigration, is the first of a Careers-Canada series and describes careers in construction. The pamphlet is divided into six major sections: (1) history and importance; (2) nature of the work, including planning, contracting, site preparation, roofing, finishing, plumbing; (3)…

  6. Guidelines for Implementing State Skill Standards Certificate Program in Construction.

    ERIC Educational Resources Information Center

    Wisconsin State Dept. of Workforce Development, Madison.

    This packet contains guidelines, a student competency checklist, and student evaluation sheet for use in a Wisconsin school-to-work state skill standards certificate program in construction. The guidelines provide a planning resource for implementing the program, which was created in partnership with unions, employers, the state Department of…

  7. Constructing Game Agents from Video of Human Behavior

    DTIC Science & Technology

    2009-01-01

    Future Work Constructing autonomous agents is an important task in video game development. Games such as Quake, Warcraft III, and Halo 2 (Damian 2005...Vision. Rio de Janeiro, Brazil: IEEE Press. Kelley, J. P.; Botea, A.; and Koenig, S. 2008. Offline planning with hierarchical task networks in video ...

  8. Simplified web-based decision support method for traffic management and work zone analysis.

    DOT National Transportation Integrated Search

    2017-01-01

    Traffic congestion mitigation is one of the key challenges that transportation planners and operations engineers face when planning for construction and maintenance activities. There is a wide variety of approaches and methods that address work zone ...

  9. Simplified web-based decision support method for traffic management and work zone analysis.

    DOT National Transportation Integrated Search

    2015-06-01

    Traffic congestion mitigation is one of the key challenges that transportation planners and operations engineers face when : planning for construction and maintenance activities. There is a wide variety of approaches and methods that address work : z...

  10. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  11. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  12. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  13. 40 CFR 35.925-1 - Facilities planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Facilities planning. 35.925-1 Section 35.925-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-1...

  14. Towards an Intelligent Planning Knowledge Base Development Environment

    NASA Technical Reports Server (NTRS)

    Chien, S.

    1994-01-01

    ract describes work in developing knowledge base editing and debugging tools for the Multimission VICAR Planner (MVP) system. MVP uses artificial intelligence planning techniques to automatically construct executable complex image processing procedures (using models of the smaller constituent image processing requests made to the JPL Multimission Image Processing Laboratory.

  15. 40 CFR 35.2050 - Effect of approval or certification of documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2050 Effect of approval or certification of documents. Review or approval of facilities plans, design drawings... relieve the grantee of its responsibility to properly plan, design, build and effectively operate and...

  16. Demographic Analysis and Planning for the Future. No. 13.

    ERIC Educational Resources Information Center

    Efird, Cathy M.

    The basic sources and types of demographic data available for future planning for the developmentally disabled are reviewed and a frame work for data organization is suggested. It is explained that future forecasts may be undertaken by the following principles: trend forecasting or extrapolation; scenario construction; models, games, and…

  17. 40 CFR 35.917-7 - State review and certification of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false State review and certification of facilities plan. 35.917-7 Section 35.917-7 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works...

  18. 40 CFR 35.917-8 - Submission and approval of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Submission and approval of facilities plan. 35.917-8 Section 35.917-8 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean...

  19. 40 CFR 35.917-9 - Revision or amendment of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Revision or amendment of facilities plan. 35.917-9 Section 35.917-9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean...

  20. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... application of BPWTT would not meet water quality standards, the facilities plan shall provide for attaining... employing the reuse of waste water and recycling of pollutants; (iii) Land application techniques; (iv...

  1. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... application of BPWTT would not meet water quality standards, the facilities plan shall provide for attaining... employing the reuse of waste water and recycling of pollutants; (iii) Land application techniques; (iv...

  2. The Incremental Launching Method for Educational Virtual Model

    NASA Astrophysics Data System (ADS)

    Martins, Octávio; Sampaio, A. Z.

    This paper describes the application of virtual reality technology to the development of an educational model related to the construction of a bridge. The model allow the visualization of the physical progression of the work following a planned construction sequence, the observation of details of the form of every component of the works and carry the study of the type and method of operation of the equipment applied in the construction. The model admit interaction and then some degree of collaboration between students and teachers in the analyses of aspects concerning geometric forms, working methodology or other technical issues observed using the application. The model presents distinct advantage as educational aids in first-degree courses in Civil Engineering.

  3. The impact of flexible benefits plans on job satisfaction, organizational commitment and turnover intentions.

    PubMed

    Heshizer, B

    1994-01-01

    This study assesses the dimensionality of employee attitudes toward flexible benefits plans and the impact of these plans on measures of job satisfaction, commitment and turnover intent. The study points to the need for more work on the measurement of employee attitudes toward flexible benefits and on the nomological framework of flexible benefits as a construct in compensation research.

  4. Technical Standards for the ATCCIS Architecture. ATCCIS Working Paper 25

    DTIC Science & Technology

    1990-08-01

    doubling every 144 UNCLASSIFIED UNCLASSIFIED insurance, tourism , construction). EDIFACT was developed by the UN working party on Facilitation of...EXPERTS mwe"aBetio -- SEIO CIVIL-ClDRETRAES~ EME GENCY -(MUCWGCOM G4Wp (ISG ,,* -- * PLANINWOCOMMITTEE (SCEPC) PLANNING AND PANGCOMIE ; OMMUNICATIONS

  5. 75 FR 52701 - Approval and Promulgation of Implementation Plans; State of Missouri

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ... information claimed to be Confidential Business Information (CBI) or other information whose disclosure is.... Ventilation Limits 5. Ongoing Ventilation Testing and Reporting Requirements 6. Winter Construction Work..., including building enclosure and ventilation projects, implementation of work practice standards, process...

  6. Space-planning and structural solutions of low-rise buildings: Optimal selection methods

    NASA Astrophysics Data System (ADS)

    Gusakova, Natalya; Minaev, Nikolay; Filushina, Kristina; Dobrynina, Olga; Gusakov, Alexander

    2017-11-01

    The present study is devoted to elaboration of methodology used to select appropriately the space-planning and structural solutions in low-rise buildings. Objective of the study is working out the system of criteria influencing the selection of space-planning and structural solutions which are most suitable for low-rise buildings and structures. Application of the defined criteria in practice aim to enhance the efficiency of capital investments, energy and resource saving, create comfortable conditions for the population considering climatic zoning of the construction site. Developments of the project can be applied while implementing investment-construction projects of low-rise housing at different kinds of territories based on the local building materials. The system of criteria influencing the optimal selection of space-planning and structural solutions of low-rise buildings has been developed. Methodological basis has been also elaborated to assess optimal selection of space-planning and structural solutions of low-rise buildings satisfying the requirements of energy-efficiency, comfort and safety, and economical efficiency. Elaborated methodology enables to intensify the processes of low-rise construction development for different types of territories taking into account climatic zoning of the construction site. Stimulation of low-rise construction processes should be based on the system of approaches which are scientifically justified; thus it allows enhancing energy efficiency, comfort, safety and economical effectiveness of low-rise buildings.

  7. Determination of sustainable values for the parameters of the construction of residential buildings

    NASA Astrophysics Data System (ADS)

    Grigoreva, Larisa; Grigoryev, Vladimir

    2018-03-01

    For the formation of programs for housing construction and planning of capital investments, when developing the strategic planning companies by construction companies, the norms or calculated indicators of the duration of the construction of high-rise residential buildings and multifunctional complexes are mandatory. Determination of stable values of the parameters for the high-rise construction residential buildings provides an opportunity to establish a reasonable duration of construction at the planning and design stages of residential complexes, taking into account the influence of market conditions factors. The concept of the formation of enlarged models for the high-rise construction residential buildings is based on a real mapping in time and space of the most significant redistribution with their organizational and technological interconnection - the preparatory period, the underground part, the above-ground part, external engineering networks, landscaping. The total duration of the construction of a residential building, depending on the duration of each redistribution and the degree of their overlapping, can be determined by one of the proposed four options. At the same time, a unified approach to determining the overall duration of construction on the basis of the provisions of a streamlined construction organization with the testing of results on the example of high-rise residential buildings of the typical I-155B series was developed, and the coefficients for combining the work and the main redevelopment of the building were determined.

  8. Dismantling the theory of planned behavior: evaluating the relative effectiveness of attempts to uniquely change attitudes, norms, and perceived behavioral control.

    PubMed

    Montanaro, Erika A; Kershaw, Trace S; Bryan, Angela D

    2018-04-18

    The current study compares the effectiveness of interventions that attempted to uniquely influence hypothesized determinants of behavior in the Theory of Planned Behavior versus some optimal combination of constructs (three constructs vs. four) to increase condom use among intentions and behavior college students. 317 participants (M age  = 19.31; SD age  = 1.31; 53.3% female; 74.1% Caucasian) were randomly assigned to one of seven computer-based interventions. Interventions were designed using the Theory of Planned Behavior as the guiding theoretical framework. 196 (61.8%) completed behavioral follow-up assessments 3-month later. We found that the four construct intervention was marginally better at changing intentions (estimate = - .06, SE = .03, p = .06), but the single construct interventions were more strongly related to risky sexual behavior at follow-up (estimate = .04, SE = .02, p = .05). This study suggests that these constructs may work together synergistically to produce change (ClinicalTrials.gov Number NCT# 02855489).

  9. Cultural Resource Protection Plan for the Remote-Handled Low-Level Waste Disposal Facility at the Idaho National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pace, Brenda Ringe; Gilbert, Hollie Kae

    2015-05-01

    This plan addresses cultural resource protection procedures to be implemented during construction of the Remote Handled Low Level Waste project at the Idaho National Laboratory. The plan proposes pre-construction review of proposed ground disturbing activities to confirm avoidance of cultural resources. Depending on the final project footprint, cultural resource protection strategies might also include additional survey, protective fencing, cultural resource mapping and relocation of surface artifacts, collection of surface artifacts for permanent curation, confirmation of undisturbed historic canal segments outside the area of potential effects for construction, and/or archaeological test excavations to assess potential subsurface cultural deposits at known culturalmore » resource locations. Additionally, all initial ground disturbing activities will be monitored for subsurface cultural resource finds, cultural resource sensitivity training will be conducted for all construction field personnel, and a stop work procedure will be implemented to guide assessment and protection of any unanticipated discoveries after initial monitoring of ground disturbance.« less

  10. The research on regional conservation planning of urban historical and cultural areas based on GIS

    NASA Astrophysics Data System (ADS)

    Li, Shangli; Xu, Jian; Li, Qian

    2017-06-01

    With the rapid economic development and the growth of population happening in the urban historical and cultural areas, heritage and historical buildings along with their natural and artificial surrounding environments are suffering constructive destruction. Due to the lack of precise partition of protection region and construction control region in the local cultural relics protection law, traditional regional conservation planning cannot engaged with the urban controllability detailed planning very well. According to the several protection regulations about heritage and historical buildings from latest laws, we choose Baxian Temple area to study on the improvments of traditional regional conservation planning. The technical methods of this study mainly rely on GIS, which can complete the fundamental work of each stage. With the analytic hierarchy process(AHP), the comprehensive architectural value assessments can be calculated according to the investigation results. Based on the calculation results and visual corridor analysis, the precise range of protection region and construction control region can be decided and the specific protection measures can be formulated.

  11. 34. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Plan of masonry. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  12. 40 CFR 35.935-8 - Supervision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Supervision. 35.935-8 Section 35.935-8... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-8 Supervision. In the case of... supervision and inspection of the project to ensure that the construction conforms with the approved plans and...

  13. 40 CFR 35.935-8 - Supervision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Supervision. 35.935-8 Section 35.935-8... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-8 Supervision. In the case of... supervision and inspection of the project to ensure that the construction conforms with the approved plans and...

  14. 40 CFR 35.935-8 - Supervision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Supervision. 35.935-8 Section 35.935-8... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-8 Supervision. In the case of... supervision and inspection of the project to ensure that the construction conforms with the approved plans and...

  15. 40 CFR 35.935-8 - Supervision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Supervision. 35.935-8 Section 35.935-8... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-8 Supervision. In the case of... supervision and inspection of the project to ensure that the construction conforms with the approved plans and...

  16. Construction Cluster Volume 5 [Electrical].

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Justice, Harrisburg. Bureau of Correction.

    The document is the fifth of a series, to be integrated with a G.E.D. program, containing instructional materials for the construction cluster. The volume focuses on electrical work and consists of 20 instructional units which require a month of study: (1) safety precautions and first aid for electrical workers; (2) planning a simple installation;…

  17. PLANNING, PROGRAMMING, DESIGNING THE COMMUNITY COLLEGE, PROCEEDINGS OF A CONFERENCE SPONSORED BY THE COLLEGE OF ARCHITECTURE AND URBAN PLANNING AND THE CENTER FOR THE DEVELOPMENT OF COMMUNITY COLLEGE EDUCATION (UNIVERSITY OF WASHINGTON, APRIL 24-25, 1967).

    ERIC Educational Resources Information Center

    SONDALLE, MARVIN P.

    PARTICIPANTS AT THIS CONFERENCE DEFINED THE ESSENTIAL MAJOR STEPS IN FACILITY PLANNING FOR A NEW CAMPUS AS SITE SELECTION, FINANCIAL PROGRAMMING, CAMPUS PLANNING, AND CONSTRUCTION. THEY ALSO AGREED THAT THE COLLEGE ADMINISTRATION AND THE ARCHITECTURAL STAFF MUST WORK TOGETHER AT EVERY STAGE OF THE PROGRAM. PRESENT TECHNIQUES OF ENROLLMENT…

  18. 40 CFR 35.917-4 - Planning scope and detail.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Planning scope and detail. 35.917-4 Section 35.917-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-4...

  19. 40 CFR 35.917-4 - Planning scope and detail.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Planning scope and detail. 35.917-4 Section 35.917-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-4...

  20. 40 CFR 35.917-4 - Planning scope and detail.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Planning scope and detail. 35.917-4 Section 35.917-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-4...

  1. 40 CFR 35.917-4 - Planning scope and detail.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Planning scope and detail. 35.917-4 Section 35.917-4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-4...

  2. Making a Meal out of Mathematics

    ERIC Educational Resources Information Center

    Penny, Robert Ward

    2010-01-01

    When planning a lesson, many teachers will start by listing content-based objectives; after all, this is how the majority of textbooks, schemes of work and lesson planning templates are constructed. This is understandable, as for many years now teachers have been legally required to teach the national curriculum which was a list of content-based…

  3. A Model for Talent Management and Career Planning

    ERIC Educational Resources Information Center

    Waheed, Sajjad; Zaim, A. Halim

    2015-01-01

    This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…

  4. Analysis of construction injury burden by type of work.

    PubMed

    Lowery, J T; Glazner, J; Borgerding, J A; Bondy, J; Lezotte, D C; Kreiss, K

    2000-04-01

    To lay groundwork for identifying patterns of injury etiology, we sought to describe injury experience associated with types of work performed at construction sites by examining workers' compensation (WC) claims for the 32,081 construction workers who built Denver International Airport (DIA). Injury rates and WC payment rates were calculated for 25 types of work based on claims and payroll data reported to DIA's owner-controlled insurance program according to National Council on Compensation Insurance job classifications. By linking DIA claims with corresponding lost-work-time (LWT) claims filed with Colorado's Workers' Compensation Division, we were also able to obtain and examine both total and median lost days for each type of work. Injury experience varied widely among the types of construction work. Workers building elevators and conduits and installing glass, metal, or steel were at particularly high risk of both LWT and non-LWT injury. Median days lost by injured workers was highest (202 days) for driving/trucking. Median days lost for most types of work was much greater than previously reported for construction: 40 days or more for 18 of the 25 types of work analyzed. WC payment rates reflect both number and severity of injuries and were generally not significantly different from expected losses. They were, however, significantly higher than expected for driving/trucking, metal/steel installation, inspection/analysis, and elevator construction. Analysis of injury data by type of work allows targeting of safety resources to high risk construction work and would be useful in prospective surveillance at large construction sites with centrally administered workers' compensation plans. Copyright 2000 Wiley-Liss, Inc.

  5. MIGRATORY LABOR IN OHIO.

    ERIC Educational Resources Information Center

    BINGHAM, SALLY

    OHIO HAS BECOME A HIGHLY INDUSTRIALIZED STATE WITH INSUFFICIENT QUALIFIED LOCAL FARM WORKERS TO MEET HARVEST DEMANDS. MIGRANT WORKERS HAVE FILLED THAT NEED, DOING MOSTLY "STOOP WORK" AND WORKING IN FOOD PROCESSING PLANTS. THE ANNUAL WORKER PLAN HAS PROVIDED FOR MORE EFFICIENT SCHEDULING OF MIGRANTS. CONSTRUCTIVE PROGRAMS HAVE BEEN…

  6. Estimation of construction and demolition waste volume generation in new residential buildings in Spain.

    PubMed

    Villoria Sáez, Paola; del Río Merino, Mercedes; Porras-Amores, César

    2012-02-01

    The management planning of construction and demolition (C&D) waste uses a single indicator which does not provide enough detailed information. Therefore the determination and implementation of other innovative and precise indicators should be determined. The aim of this research work is to improve existing C&D waste quantification tools in the construction of new residential buildings in Spain. For this purpose, several housing projects were studied to determine an estimation of C&D waste generated during their construction process. This paper determines the values of three indicators to estimate the generation of C&D waste in new residential buildings in Spain, itemizing types of waste and construction stages. The inclusion of two more accurate indicators, in addition to the global one commonly in use, provides a significant improvement in C&D waste quantification tools and management planning.

  7. Participatory Training to Improve Safety and Health in Small Construction Sites in Some Countries in Asia: Development and Application of the WISCON Training Program.

    PubMed

    Kawakami, Tsuyoshi

    2016-08-01

    A participatory training program, Work Improvement in Small Construction Sites, was developed to provide practical support measures to the small construction sector. Managers and workers from selected small sites were interviewed about their occupational safety and health risks. The Work Improvement in Small Construction Sites training program comprised a 45-item action checklist, photos, and illustrations showing local examples and group work methods. Pilot training workshops were carried out with workers and employers in Cambodia, Laos, Mongolia, Thailand, and Vietnam. Participants subsequently planned, and using locally available low-cost materials, implemented their own improvements such as hand-made hand trucks to carry heavy materials, removal of projecting nails from timber materials, and fences to protect roof workers from falling. Local Work Improvement in Small Construction Sites trainers consisting of government officials, workers, employers, and nongovernment organization representatives were then trained to implement the Work Improvement in Small Construction Sites training widely. Keys to success were easy-to-apply training tools aiming at immediate, low-cost improvements, and collaboration with various local people's networks. © The Author(s) 2016.

  8. Spaceborne construction and operations planning - Decision rules for selecting EVA, telerobot, and combined work-systems

    NASA Technical Reports Server (NTRS)

    Smith, Jeffrey H.

    1992-01-01

    An approach is presented for selecting an appropriate work-system for performing construction and operations tasks by humans and telerobots. The decision to use extravehicular activity (EVA) performed by astronauts, extravehicular robotics (EVR), or a combination of EVA and EVR is determined by the ratio of the marginal costs of EVA, EVR, and IVA. The approach proposed here is useful for examining cost trade-offs between tasks and performing trade studies of task improvement techniques (human or telerobotic).

  9. Activity Theory as a Theoretical Framework for Health Self-Quantification: A Systematic Review of Empirical Studies.

    PubMed

    Almalki, Manal; Gray, Kathleen; Martin-Sanchez, Fernando

    2016-05-27

    Self-quantification (SQ) is a way of working in which, by using tracking tools, people aim to collect, manage, and reflect on personal health data to gain a better understanding of their own body, health behavior, and interaction with the world around them. However, health SQ lacks a formal framework for describing the self-quantifiers' activities and their contextual components or constructs to pursue these health related goals. Establishing such framework is important because it is the first step to operationalize health SQ fully. This may in turn help to achieve the aims of health professionals and researchers who seek to make or study changes in the self-quantifiers' health systematically. The aim of this study was to review studies on health SQ in order to answer the following questions: What are the general features of the work and the particular activities that self-quantifiers perform to achieve their health objectives? What constructs of health SQ have been identified in the scientific literature? How have these studies described such constructs? How would it be possible to model these constructs theoretically to characterize the work of health SQ? A systematic review of peer-reviewed literature was conducted. A total of 26 empirical studies were included. The content of these studies was thematically analyzed using Activity Theory as an organizing framework. The literature provided varying descriptions of health SQ as data-driven and objective-oriented work mediated by SQ tools. From the literature, we identified two types of SQ work: work on data (ie, data management activities) and work with data (ie, health management activities). Using Activity Theory, these activities could be characterized into 6 constructs: users, tracking tools, health objectives, division of work, community or group setting, and SQ plan and rules. We could not find a reference to any single study that accounted for all these activities and constructs of health SQ activity. A Health Self-Quantification Activity Framework is presented, which shows SQ tool use in context, in relation to the goals, plans, and competence of the user. This makes it easier to analyze issues affecting SQ activity, and thereby makes it more feasible to address them. This review makes two significant contributions to research in this field: it explores health SQ work and its constructs thoroughly and it adapts Activity Theory to describe health SQ activity systematically.

  10. 7 CFR 1924.109-1924.114 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work §§ 1924.109-1924...

  11. 7 CFR 1924.116-1924.118 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work §§ 1924.116-1924...

  12. 7 CFR 1924.123-1924.149 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work §§ 1924.123-1924...

  13. 7 CFR 1924.120-1924.121 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work §§ 1924.120-1924...

  14. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  15. 37. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of historic construction drawing, ink on linen, no date (est. January 1890) (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Plan of masonry approach. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  16. 26. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: General plan of truss spans. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  17. 31. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge (truss spans): Plan of portal struts. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  18. 36. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: General plan of west approach. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  19. 35. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: General plan of east approach. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  20. 25. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Photographic copy of historic construction drawing, ink on linen, November 1889/January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Plan and profile of Selby Avenue Bridge. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  1. 33. Photographic copy of historic construction drawing, ink on linen, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Photographic copy of historic construction drawing, ink on linen, January 1890 (original filed in drawer 98, Bridge Division, Department of Public Works, St. Paul City Annex). Selby Avenue Bridge: Plan of shoes, bolsters, & rollers. - Selby Avenue Bridge, Spanning Short Line Railways track at Selby Avenue between Hamline & Snelling Avenues, Saint Paul, Ramsey County, MN

  2. 10. Photographic copy of copy of original construction drawing, dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of copy of original construction drawing, dated 1899?. Original in possession of Twin Lakes Reservoir and Canal Company, Ordway, Colorado. PLAN OF DAM AND HEAD GATES FOR THE TWIN LAKES RESERVOIR. - Twin Lakes Dam & Outlet Works, Beneath Twin Lakes Reservoir, T11S, R80W, S22, Twin Lakes, Lake County, CO

  3. Construction of Tasks in Order to Develop and Promote Classroom Communication in Mathematics

    ERIC Educational Resources Information Center

    Olteanu, Lucian

    2015-01-01

    In this article, the focus is on task construction and the importance of this process to develop and promote classroom communication in mathematics. The students' tests, examination of students' mathematical work, the teachers' lesson plans, and reports of the lessons' instructions are the basic data for this article. The analysis indicated that…

  4. Timing Is Everything.

    ERIC Educational Resources Information Center

    Brunner, Patrick M.; Shelley, Kevin D.

    2001-01-01

    In school construction projects a great deal of work and planning needs to happen before ground breaking starts. Lists consistent factors that should always be considered when setting up a facility-design timeline. (MLF)

  5. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    NASA Astrophysics Data System (ADS)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  6. Progress in Decommissioning the Humboldt Bay Power Plant - 13604

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John

    Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less

  7. Model and Algorithm for Substantiating Solutions for Organization of High-Rise Construction Project

    NASA Astrophysics Data System (ADS)

    Anisimov, Vladimir; Anisimov, Evgeniy; Chernysh, Anatoliy

    2018-03-01

    In the paper the models and the algorithm for the optimal plan formation for the organization of the material and logistical processes of the high-rise construction project and their financial support are developed. The model is based on the representation of the optimization procedure in the form of a non-linear problem of discrete programming, which consists in minimizing the execution time of a set of interrelated works by a limited number of partially interchangeable performers while limiting the total cost of performing the work. The proposed model and algorithm are the basis for creating specific organization management methodologies for the high-rise construction project.

  8. Integrating Building Information Modeling and Health and Safety for Onsite Construction

    PubMed Central

    Ganah, Abdulkadir; John, Godfaurd A.

    2014-01-01

    Background Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. Methods In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. Results The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. Conclusion From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite. PMID:25830069

  9. Integrating building information modeling and health and safety for onsite construction.

    PubMed

    Ganah, Abdulkadir; John, Godfaurd A

    2015-03-01

    Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite.

  10. Analysis of Engineering Faculty Members' Reflections on Planning for Instruction

    ERIC Educational Resources Information Center

    Warcholak, Nicholas D.

    2014-01-01

    The purpose of this study was to begin development of a method to better describe the instructional planning processes of post-secondary teachers. Long term, it is hoped this work might have constructive implications for faculty development by providing a few case studies demonstrating how instructors with a strong interest in teaching think about…

  11. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Water quality management plans and agencies. 35.925-2 Section 35.925-2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-2 Water quality management...

  12. Performance related specifications for hydraulic cement concrete used in construction and rehabilitation of ground transportation facilities.

    DOT National Transportation Integrated Search

    1982-01-01

    This report summarizes the work performed on the subject study from June through September 1982. In accordance with the revised work plan for Task 4 of the project approved May 24, 1982, the new completion date for the project is April 30, 1983.

  13. Social Work Assessment Notes: A Comprehensive Outcomes-Based Hospice Documentation System.

    PubMed

    Hansen, Angela Gregory; Martin, Ellen; Jones, Barbara L; Pomeroy, Elizabeth C

    2015-08-01

    This article describes the development of an integrated psychosocial patient and caregiver assessment and plan of care for hospice social work documentation. A team of hospice social workers developed the Social Work Assessment Notes as a quality improvement project in collaboration with the information technology department. Using the Social Work Assessment Tool as an organizing framework, this comprehensive hospice social work documentation system is designed to integrate assessment, planning, and outcomes measurement. The system was developed to guide the assessment of patients' and caregivers' needs related to end-of-life psychosocial issues, to facilitate collaborative care plan development, and to measure patient- and family-centered outcomes. Goals established with the patient and the caregiver are documented in the plan of care and become the foundation for patient-centered, strengths-based interventions. Likert scales are used to assign numerical severity levels for identified issues and progress made toward goals and to track the outcome of social work interventions across nine psychosocial constructs. The documentation system was developed for use in an electronic health record but can be used for paper charting. Future plans include automated aggregate outcomes measurement to identify the most effective interventions and best practices in end-of-life care.

  14. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  15. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  16. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  17. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  18. 7 CFR 1942.126 - Planning, bidding, contracting, constructing, procuring.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... evaluate the proposals received or can obtain adequate assistance from other sources, such as State or.... Contract documents must be sufficiently descriptive and legally binding to accomplish the work as...

  19. A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study.

    PubMed

    Goh, Yang Miang; Askar Ali, Mohamed Jawad

    2016-08-01

    One of the key challenges in improving construction safety and health is the management of safety behavior. From a system point of view, workers work unsafely due to system level issues such as poor safety culture, excessive production pressure, inadequate allocation of resources and time and lack of training. These systemic issues should be eradicated or minimized during planning. However, there is a lack of detailed planning tools to help managers assess the impact of their upstream decisions on worker safety behavior. Even though simulation had been used in construction planning, the review conducted in this study showed that construction safety management research had not been exploiting the potential of simulation techniques. Thus, a hybrid simulation framework is proposed to facilitate integration of safety management considerations into construction activity simulation. The hybrid framework consists of discrete event simulation (DES) as the core, but heterogeneous, interactive and intelligent (able to make decisions) agents replace traditional entities and resources. In addition, some of the cognitive processes and physiological aspects of agents are captured using system dynamics (SD) approach. The combination of DES, agent-based simulation (ABS) and SD allows a more "natural" representation of the complex dynamics in construction activities. The proposed hybrid framework was demonstrated using a hypothetical case study. In addition, due to the lack of application of factorial experiment approach in safety management simulation, the case study demonstrated sensitivity analysis and factorial experiment to guide future research. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. Problem Solving in a Middle School Robotics Design Classroom

    NASA Astrophysics Data System (ADS)

    Norton, Stephen J.; McRobbie, Campbell J.; Ginns, Ian S.

    2007-07-01

    Little research has been conducted on how students work when they are required to plan, build and evaluate artefacts in technology rich learning environments such as those supported by tools including flow charts, Labview programming and Lego construction. In this study, activity theory was used as an analytic tool to examine the social construction of meaning. There was a focus on the effect of teachers’ goals and the rules they enacted upon student use of the flow chart planning tool, and the tools of the programming language Labview and Lego construction. It was found that the articulation of a teacher’s goals via rules and divisions of labour helped to form distinct communities of learning and influenced the development of different problem solving strategies. The use of the planning tool flow charting was associated with continuity of approach, integration of problem solutions including appreciation of the nexus between construction and programming, and greater educational transformation. Students who flow charted defined problems in a more holistic way and demonstrated more methodical, insightful and integrated approaches to their use of tools. The findings have implications for teaching in design dominated learning environments.

  1. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  2. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  3. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  4. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  5. Demonstration of a Spoken Dialogue Interface for Planning Activities of a Semi-autonomous Robot

    NASA Technical Reports Server (NTRS)

    Dowding, John; Frank, Jeremy; Hockey, Beth Ann; Jonsson, Ari; Aist, Gregory

    2002-01-01

    Planning and scheduling in the face of uncertainty and change pushes the capabilities of both planning and dialogue technologies by requiring complex negotiation to arrive at a workable plan. Planning for use of semi-autonomous robots involves negotiation among multiple participants with competing scientific and engineering goals to co-construct a complex plan. In NASA applications this plan construction is done under severe time pressure so having a dialogue interface to the plan construction tools can aid rapid completion of the process. But, this will put significant demands on spoken dialogue technology, particularly in the areas of dialogue management and generation. The dialogue interface will need to be able to handle the complex dialogue strategies that occur in negotiation dialogues, including hypotheticals and revisions, and the generation component will require an ability to summarize complex plans. This demonstration will describe a work in progress towards building a spoken dialogue interface to the EUROPA planner for the purposes of planning and scheduling the activities of a semi-autonomous robot. A prototype interface has been built for planning the schedule of the Personal Satellite Assistant (PSA), a mobile robot designed for micro-gravity environments that is intended for use on the Space Shuttle and International Space Station. The spoken dialogue interface gives the user the capability to ask for a description of the plan, ask specific questions about the plan, and update or modify the plan. We anticipate that a spoken dialogue interface to the planner will provide a natural augmentation or alternative to the visualization interface, in situations in which the user needs very targeted information about the plan, in situations where natural language can express complex ideas more concisely than GUI actions, or in situations in which a graphical user interface is not appropriate.

  6. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Allowance for Facilities Planning and Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works Pt. 35, Subpt. I, App. B Appendix B to...

  7. From Constructs to Measures: Finalizing the Common Core. The Project on State-Level Child Outcomes.

    ERIC Educational Resources Information Center

    Child Trends, Inc., Washington, DC.

    The U.S. Department of Health and Human Services' Office of Planning, Research, and Evaluation at the Administration for Children and Families, and the Office of the Assistant Secretary for Planning and Evaluation, are working together with states and other groups to improve the measurement of child outcomes in state welfare evaluations and in…

  8. Computer aided system engineering for space construction

    NASA Technical Reports Server (NTRS)

    Racheli, Ugo

    1989-01-01

    This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.

  9. Space architecture monograph series. Volume 4: Genesis 2: Advanced lunar outpost

    NASA Technical Reports Server (NTRS)

    Fieber, Joseph P.; Huebner-Moths, Janis; Paruleski, Kerry L.; Moore, Gary T. (Editor)

    1991-01-01

    This research and design study investigated advanced lunar habitats for astronauts and mission specialists on the Earth's moon. Design recommendations are based on environmental response to the lunar environment, human habitability (human factors and environmental behavior research), transportability (structural and materials system with least mass), constructability (minimizing extravehicular time), construction dependability and resilience, and suitability for NASA launch research missions in the 21st century. The recommended design uses lunar lava tubes, with construction being a combination of Space Station Freedom derived hard modules and light weight Kevlar laminate inflatable structures. The proposed habitat includes research labs and a biotron, crew quarters and crew support facility, mission control, health maintenance facility, maintenance work areas for psychological retreat, privacy, and comtemplation. Furniture, specialized equipment, and lighting are included in the analysis and design. Drawings include base master plans, construction sequencing, overall architectural configuration, detailed floor plans, sections and axonometrics, with interior perspectives.

  10. Increasing energy efficiency level of building production based on applying modern mechanization facilities

    NASA Astrophysics Data System (ADS)

    Prokhorov, Sergey

    2017-10-01

    Building industry in a present day going through the hard times. Machine and mechanism exploitation cost, on a field of construction and installation works, takes a substantial part in total building construction expenses. There is a necessity to elaborate high efficient method, which allows not only to increase production, but also to reduce direct costs during machine fleet exploitation, and to increase its energy efficiency. In order to achieve the goal we plan to use modern methods of work production, hi-tech and energy saving machine tools and technologies, and use of optimal mechanization sets. As the optimization criteria there are exploitation prime cost and set efficiency. During actual task-solving process we made a conclusion, which shows that mechanization works, energy audit with production juxtaposition, prime prices and costs for energy resources allow to make complex machine fleet supply, improve ecological level and increase construction and installation work quality.

  11. Application of scenario analysis and multiagent technique in land-use planning: a case study on Sanjiang wetlands.

    PubMed

    Yu, Huan; Ni, Shi-Jun; Kong, Bo; He, Zheng-Wei; Zhang, Cheng-Jiang; Zhang, Shu-Qing; Pan, Xin; Xia, Chao-Xu; Li, Xuan-Qiong

    2013-01-01

    Land-use planning has triggered debates on social and environmental values, in which two key questions will be faced: one is how to see different planning simulation results instantaneously and apply the results back to interactively assist planning work; the other is how to ensure that the planning simulation result is scientific and accurate. To answer these questions, the objective of this paper is to analyze whether and how a bridge can be built between qualitative and quantitative approaches for land-use planning work and to find out a way to overcome the gap that exists between the ability to construct computer simulation models to aid integrated land-use plan making and the demand for them by planning professionals. The study presented a theoretical framework of land-use planning based on scenario analysis (SA) method and multiagent system (MAS) simulation integration and selected freshwater wetlands in the Sanjiang Plain of China as a case study area. Study results showed that MAS simulation technique emphasizing quantitative process effectively compensated for the SA method emphasizing qualitative process, which realized the organic combination of qualitative and quantitative land-use planning work, and then provided a new idea and method for the land-use planning and sustainable managements of land resources.

  12. Application of Scenario Analysis and Multiagent Technique in Land-Use Planning: A Case Study on Sanjiang Wetlands

    PubMed Central

    Ni, Shi-Jun; He, Zheng-Wei; Zhang, Cheng-Jiang; Zhang, Shu-Qing; Pan, Xin; Xia, Chao-Xu; Li, Xuan-Qiong

    2013-01-01

    Land-use planning has triggered debates on social and environmental values, in which two key questions will be faced: one is how to see different planning simulation results instantaneously and apply the results back to interactively assist planning work; the other is how to ensure that the planning simulation result is scientific and accurate. To answer these questions, the objective of this paper is to analyze whether and how a bridge can be built between qualitative and quantitative approaches for land-use planning work and to find out a way to overcome the gap that exists between the ability to construct computer simulation models to aid integrated land-use plan making and the demand for them by planning professionals. The study presented a theoretical framework of land-use planning based on scenario analysis (SA) method and multiagent system (MAS) simulation integration and selected freshwater wetlands in the Sanjiang Plain of China as a case study area. Study results showed that MAS simulation technique emphasizing quantitative process effectively compensated for the SA method emphasizing qualitative process, which realized the organic combination of qualitative and quantitative land-use planning work, and then provided a new idea and method for the land-use planning and sustainable managements of land resources. PMID:23818816

  13. VIPER: Virtual Intelligent Planetary Exploration Rover

    NASA Technical Reports Server (NTRS)

    Edwards, Laurence; Flueckiger, Lorenzo; Nguyen, Laurent; Washington, Richard

    2001-01-01

    Simulation and visualization of rover behavior are critical capabilities for scientists and rover operators to construct, test, and validate plans for commanding a remote rover. The VIPER system links these capabilities. using a high-fidelity virtual-reality (VR) environment. a kinematically accurate simulator, and a flexible plan executive to allow users to simulate and visualize possible execution outcomes of a plan under development. This work is part of a larger vision of a science-centered rover control environment, where a scientist may inspect and explore the environment via VR tools, specify science goals, and visualize the expected and actual behavior of the remote rover. The VIPER system is constructed from three generic systems, linked together via a minimal amount of customization into the integrated system. The complete system points out the power of combining plan execution, simulation, and visualization for envisioning rover behavior; it also demonstrates the utility of developing generic technologies. which can be combined in novel and useful ways.

  14. Economic benefits of improved meteorological forecasts - The construction industry

    NASA Technical Reports Server (NTRS)

    Bhattacharyya, R. K.; Greenberg, J. S.

    1976-01-01

    Estimates are made of the potential economic benefits accruing to particular industries from timely utilization of satellite-derived six-hour weather forecasts, and of economic penalties resulting from failure to utilize such forecasts in day-to-day planning. The cost estimate study is centered on the U.S. construction industry, with results simplified to yes/no 6-hr forecasts on thunderstorm activity and work/no work decisions. Effects of weather elements (thunderstorms, snow and sleet) on various construction operations are indicated. Potential dollar benefits for other industries, including air transportation and other forms of transportation, are diagrammed for comparison. Geosynchronous satellites such as STORMSAT, SEOS, and SMS/GOES are considered as sources of the forecast data.

  15. 7 CFR 1717.154 - Transitional assistance in connection with new loans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to finance equipment and facilities included in a RUS approved construction work plan or amendment if... requests for this longer reimbursement period, RUS will consider the stresses that the transaction and...

  16. 7 CFR 1717.154 - Transitional assistance in connection with new loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to finance equipment and facilities included in a RUS approved construction work plan or amendment if... requests for this longer reimbursement period, RUS will consider the stresses that the transaction and...

  17. Construction of shipping channels in the Detroit River—History and environmental consequences

    USGS Publications Warehouse

    Bennion, David H.; Manny, Bruce A.

    2011-01-01

    The Detroit River is one of the most biologically diverse areas in the Great Lakes basin. It has been an important international shipping route since the 1820s and is one of the busiest navigation centers in the United States. Historically, it supported one of the most profitable Lake Whitefish (Coregonus clupeaformis) commercial fisheries in the Great Lakes. Since 1874, the lower Detroit River has been systematically and extensively modified, by construction of deepwater channels, to facilitate commercial shipping. Large-scale dredging, disposal of dredge spoils, and construction of water-level compensating works has greatly altered channel morphology and flow dynamics of the river, disrupting ecological function and fishery productivity of the river and influencing Great Lakes water levels. From 1874 to 1968, major construction projects created 96.5 kilometers (60 miles) of shipping channels, removed over 46,200,000 m3 of material, covered 4,050 hectares (40.5 square kilometers) of river bottom with dredge spoils, and built 85 hectares of above-waterline compensating works at a total cost of US$283 million. Interest by industries and government agencies to develop the river further for shipping is high and increasing. Historically, as environmental protection agencies were created, construction impacts on natural resources were increasingly addressed during the planning process and, in some cases, assessments of these impacts greatly altered or halted proposed construction projects. Careful planning of future shipping-channel construction and maintenance projects, including a thorough analysis of the expected environmental impacts, could greatly reduce financial costs and ecological damages as compared to past shipping-channel construction projects.

  18. Activity Theory as a Theoretical Framework for Health Self-Quantification: A Systematic Review of Empirical Studies

    PubMed Central

    2016-01-01

    Background Self-quantification (SQ) is a way of working in which, by using tracking tools, people aim to collect, manage, and reflect on personal health data to gain a better understanding of their own body, health behavior, and interaction with the world around them. However, health SQ lacks a formal framework for describing the self-quantifiers’ activities and their contextual components or constructs to pursue these health related goals. Establishing such framework is important because it is the first step to operationalize health SQ fully. This may in turn help to achieve the aims of health professionals and researchers who seek to make or study changes in the self-quantifiers’ health systematically. Objective The aim of this study was to review studies on health SQ in order to answer the following questions: What are the general features of the work and the particular activities that self-quantifiers perform to achieve their health objectives? What constructs of health SQ have been identified in the scientific literature? How have these studies described such constructs? How would it be possible to model these constructs theoretically to characterize the work of health SQ? Methods A systematic review of peer-reviewed literature was conducted. A total of 26 empirical studies were included. The content of these studies was thematically analyzed using Activity Theory as an organizing framework. Results The literature provided varying descriptions of health SQ as data-driven and objective-oriented work mediated by SQ tools. From the literature, we identified two types of SQ work: work on data (ie, data management activities) and work with data (ie, health management activities). Using Activity Theory, these activities could be characterized into 6 constructs: users, tracking tools, health objectives, division of work, community or group setting, and SQ plan and rules. We could not find a reference to any single study that accounted for all these activities and constructs of health SQ activity. Conclusions A Health Self-Quantification Activity Framework is presented, which shows SQ tool use in context, in relation to the goals, plans, and competence of the user. This makes it easier to analyze issues affecting SQ activity, and thereby makes it more feasible to address them. This review makes two significant contributions to research in this field: it explores health SQ work and its constructs thoroughly and it adapts Activity Theory to describe health SQ activity systematically. PMID:27234343

  19. Analysing the external supply chain risk driver competitiveness: a risk mitigation framework and business continuity plan.

    PubMed

    Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua

    2010-11-01

    Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.

  20. Hurricane risk mitigation - Emergency Operations Center

    NASA Image and Video Library

    2008-07-29

    Construction work on a new Emergency Operations Center at Stennis Space Center is nearing completion. Construction is expected to be complete by February 2009, with actual occupancy of the building planned for later that year. The new building will house fire, medical and security teams and will provide a top-grade facility to support storm emergency responder teams and emergency management operations for the south Mississippi facility.

  1. Environmental Assessment for Fiber Optic Diverse Route

    DTIC Science & Technology

    2010-07-24

    and the military working dogs training and kennel areas. Currently, a single fiber optic communications line exists that transmits all...agreement from the County to trench along the New Santa Fe Trail. However, signs will be posted two weeks before construction begins in designated ... Plan . Heavy equipment and other vehicles associated with the trench line construction will contain hazardous materials such as motor oil and gasoline

  2. Action Plan on Communication Practices: Roles of Tutors at EMU Distance Education Institute to Overcome Social Barriers in Constructing Knowledge

    ERIC Educational Resources Information Center

    Aksal, Fahriye A.

    2009-01-01

    The research involved an action plan for the improvement of the quality of the Distance Education Institute of Eastern Mediterranean University and based on EUA norms. This research is part of a work based learning process to enhance the contribution of online pedagogy and teaching process for online tutors. The research aimed to stress the…

  3. 76 FR 76048 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... of the Site proposed for deletion, is available in the deletion docket: Site Location and History The... State Welding and Marine Works and the Golden Triangle Shipyard. The construction of wastewater...

  4. Recycling Old PCC Pavement - Performance Evaluation of FAI 57 Inlays

    DOT National Transportation Integrated Search

    1993-02-01

    This report details the construction and performance monitoring efforts of two demonstration projects proposed in an experimental features work plan entitled Recycling Old PCC Pavement". The objectives of this experimental feature were to evaluate th...

  5. Contingency Planning for Planetary Rovers

    NASA Technical Reports Server (NTRS)

    Dearden, Richard; Meuleau, Nicolas; Ramakrishnan, Sailesh; Smith, David; Washington, Rich; Clancy, Daniel (Technical Monitor)

    2002-01-01

    There has been considerable work in AI on planning under uncertainty. But this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the power required, the data storage necessary, along with its position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

  6. Incremental Contingency Planning

    NASA Technical Reports Server (NTRS)

    Dearden, Richard; Meuleau, Nicolas; Ramakrishnan, Sailesh; Smith, David E.; Washington, Rich

    2003-01-01

    There has been considerable work in AI on planning under uncertainty. However, this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the energy required, the data storage necessary, and its current position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

  7. Evaluating the Facilities Planning, Design, and Construction Department: The Capital Programs Management Audit.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.; Kirkwood, Dennis M.

    2000-01-01

    Presents a diagnostic model for assessing the state of an institution's capital programs management (CPM) by delineating "work processes" which comprise that function. What capital programs management is, its resources, and its phases and work processes are described, followed by case studies of the CPM Process Model as an assessment tool. (GR)

  8. 7 CFR Exhibit K to Subpart A of... - Classifications for Multi-Family Residential Rehabilitation Work

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Classifications for Multi-Family Residential Rehabilitation Work K Exhibit K to Subpart A of Part 1924 Agriculture Regulations of the Department of... Planning and Performing Construction and Other Development Pt. 1924, Subpt. A, Exh. K Exhibit K to Subpart...

  9. 7 CFR Exhibit K to Subpart A of... - Classifications for Multi-Family Residential Rehabilitation Work

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Classifications for Multi-Family Residential Rehabilitation Work K Exhibit K to Subpart A of Part 1924 Agriculture Regulations of the Department of... Planning and Performing Construction and Other Development Pt. 1924, Subpt. A, Exh. K Exhibit K to Subpart...

  10. 7 CFR Exhibit K to Subpart A of... - Classifications for Multi-Family Residential Rehabilitation Work

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Classifications for Multi-Family Residential Rehabilitation Work K Exhibit K to Subpart A of Part 1924 Agriculture Regulations of the Department of... Planning and Performing Construction and Other Development Pt. 1924, Subpt. A, Exh. K Exhibit K to Subpart...

  11. 7 CFR Exhibit K to Subpart A of... - Classifications for Multi-Family Residential Rehabilitation Work

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Classifications for Multi-Family Residential Rehabilitation Work K Exhibit K to Subpart A of Part 1924 Agriculture Regulations of the Department of... Planning and Performing Construction and Other Development Pt. 1924, Subpt. A, Exh. K Exhibit K to Subpart...

  12. 7 CFR Exhibit K to Subpart A of... - Classifications for Multi-Family Residential Rehabilitation Work

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Classifications for Multi-Family Residential Rehabilitation Work K Exhibit K to Subpart A of Part 1924 Agriculture Regulations of the Department of... Planning and Performing Construction and Other Development Pt. 1924, Subpt. A, Exh. K Exhibit K to Subpart...

  13. Manned remote work station development article

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Flight article and associated design concepts are evaluated to meet fundamental requirements of a universal crew cabin to be used as a construction cherrypicker, a space crane turret, a railed work station, or a free flyer. Key technology developments are embodied into a simulation program. A schedule and simulation test plan matrix is given for the open cabin cherry picker.

  14. Multiple-source spatial data fusion and integration research in the region unified planning management information system

    NASA Astrophysics Data System (ADS)

    Liu, Zhijun; Zhang, Liangpei; Liu, Zhenmin; Jiao, Hongbo; Chen, Liqun

    2008-12-01

    In order to manage the internal resources of Gulf of Tonkin and integrate multiple-source spatial data, the establishment of region unified plan management system is needed. The data fusion and the integrated research should be carried on because there are some difficulties in the course of the system's establishment. For example, kinds of planning and the project data format are different, and data criterion is not unified. Besides, the time state property is strong, and spatial reference is inconsistent, etc. In this article the ARCGIS ENGINE is introduced as the developing platform, key technologies are researched, such as multiple-source data transformation and fusion, remote sensing data and DEM fusion and integrated, plan and project data integration, and so on. Practice shows that the system improves the working efficiency of Guangxi Gulf of Tonkin Economic Zone Management Committee significantly and promotes planning construction work of the economic zone remarkably.

  15. Dynamic Simulation on the Installation Process of HGIS in Transformer Substation

    NASA Astrophysics Data System (ADS)

    Lin, Tao; Li, Shaohua; Wang, Hu; Che, Deyong; Qi, Guangcai; Yao, Jianfeng; Zhang, Qingzhe

    The technological requirements of Hypid Gas Insulated Switchgear (HGIS) installation in transformer substation is high and the control points of quality is excessive. Most of the engineers and technicians in the construction enterprises are not familiar with equipments of HGIS. In order to solve these problem, equipments of HGIS is modeled on the computer by SolidWorks software. Installation process of civil foundation and closed-type equipments is optimized dynamically with virtual assemble technology. Announcements and application work are composited into animation file. Skills of modeling and simulation is tidied classify as well. The result of the visual dynamic simulation can instruct the actual construction process of HGIS to a certain degree and can promote reasonable construction planning and management. It can also improve the method and quality of staff training for electric power construction enterprises.

  16. 77 FR 18853 - Trinity River National Wildlife Refuge, Liberty County, TX; Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ... the refuge. curricula, working with program, upon the local schools to meet completion of the State... fishing pier, at Champion Lake Public fishing piers at butterfly garden, Use Area, and construct Brierwood...

  17. Implementing AORN recommended practices for a safe environment of care, part II.

    PubMed

    Kennedy, Lynne

    2014-09-01

    Construction in and around a working perioperative suite is a challenge beyond merely managing traffic patterns and maintaining the sterile field. The AORN "Recommended practices for a safe environment of care, part II" provides guidance on building design; movement of patients, personnel, supplies, and equipment; environmental controls; safety and security; and control of noise and distractions. Whether the OR suite evolves through construction, reconstruction, or remodeling, a multidisciplinary team of construction experts and health care professionals should create a functional plan and communicate at every stage of the project to maintain a safe environment and achieve a well-designed outcome. Emergency preparedness, a facility-wide security plan, and minimization of noise and distractions in the OR also help enhance the safety of the perioperative environment. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  18. Community Meeting to Focus on NREL Construction Plans

    Science.gov Websites

    Community Meeting to Focus on NREL Construction Plans For more information contact: Kerry Masson issues including planned construction projects on NREL's 300-acre campus. Construction plans include

  19. A-Gendering Skill. Conversations around Women, Work and Skill: An Australian Perspective. EEE703 Project Development Plan 2.

    ERIC Educational Resources Information Center

    Butler, Elaine, Ed.; Brown, Mike, Ed.

    These 12 papers are part of the study materials for the one-semester distance education unit, Project Development Plan 2, in the Open Campus Program at Deakin University (Australia). They examine the breadth and depth of the actions and debates around the social construction of skill and the critical role played by the concept of skill in the…

  20. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  1. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  2. STS-116 Crewmembers Curbeam and Williams work near P6 SAW during EVA 3

    NASA Image and Video Library

    2006-12-17

    S116-E-06603 (16 Dec. 2006) --- Astronauts Robert L. Curbeam, Jr., (red stripes), STS-116 mission specialist, and Sunita L. Williams, Expedition 14 flight engineer, work near the International Space Station's left P6 solar array wing during the mission's third planned session of extravehicular activity (EVA) as construction resumes on the International Space Station.

  3. STS-116 Crewmembers Curbeam and Williams work near P6 SAW during EVA 3

    NASA Image and Video Library

    2006-12-17

    S116-E-06606 (16 Dec. 2006) --- Astronauts Robert L. Curbeam, Jr., (red stripes), STS-116 mission specialist, and Sunita L. Williams, Expedition 14 flight engineer, work near the International Space Station's left P6 solar array wing during the mission's third planned session of extravehicular activity (EVA) as construction resumes on the International Space Station.

  4. Work plan for special design features and crack sealing maintenance.

    DOT National Transportation Integrated Search

    2013-09-01

    The Alaska DOT&PF wants to construct and maintain asphalt concrete (AC) paved highways in a way that minimizes roadway lifecycle costs while preserving acceptable : performance. Thermal cracking is a natural feature of most paved Alaska roadways that...

  5. Integrated capabilities in heavy vehicles : human factors research needs

    DOT National Transportation Integrated Search

    2003-10-09

    The Full Road Closure method uses facility closure and total traffic diversion, which may be for one direction or bi-directional traffic flow, to accelerate construction and reduce the negative impacts of work zones. With good planning, interagency c...

  6. Laboratory Equipment Criteria.

    ERIC Educational Resources Information Center

    State Univ. Construction Fund, Albany, NY.

    Requirements for planning, designing, constructing and installing laboratory furniture are given in conjunction with establishing facility criteria for housing laboratory equipment. Furniture and equipment described include--(1) center tables, (2) reagent racks, (3) laboratory benches and their mechanical fixtures, (4) sink and work counters, (5)…

  7. [Quantitative assessment of fungal risk in the case of construction works in healthcare establishments: Proposed indicators for the determination of the impact of management precautions on the risk of fungal infection].

    PubMed

    Gangneux, J-P; Adjidé, C-C; Bernard, L; Botterel, F; Carel, A; Castel, O; Derouin, F; Hoarau, G; Labussière, H; Lafaurie, M; Millon, L; Pottecher, B; Thiebaut, A; Turco, M; Baron, R

    2012-03-01

    Construction works in healthcare establishments produce airborne fungal spores and considerably increase the risk of exposure of immunosuppressed patients. It is necessary to reinforce protective measures, or even to implement specific precautions, during this critical phase. The aim of these precautions is to protect both those areas, which are susceptible to dust, and patients at risk of a fungal infection particularly invasive aspergillosis. When construction works are planned in healthcare establishments, the first step consists in the characterisation of the environmental fungal risk and the second one in proposing risk management methods. It is then essential to establish impact indicators in order to evaluate the risk management precautions applied. The working group promoted by the French societies of medical mycology and hospital hygiene (SFMM & SF2H) details here both environmental and epidemiological impact indicators that can be used. Copyright © 2012. Published by Elsevier SAS.

  8. World War 2 in Alaska: A Historic and Resources Management Plan. Volume 1. A History of World War 2 in Alaska and Management Plan

    DTIC Science & Technology

    1987-05-01

    Construction Division developed to Series 600 structure in response to the need to house recruits during training. The result was a wood frame...building with board and batten siding resting on wooden piers. It was without plumbing and heated with wood -burning stoves. Between the wars, the plans were...personnel had to make do with a variety of coal, wood and oil space heaters which generally worked poorly in terms of heat radiation, making the immediate

  9. An initial investigation on the challenges of managing construction workforce in Saudi Arabia

    NASA Astrophysics Data System (ADS)

    Al-Emad, N.; Rahman, I. A.

    2017-11-01

    Most of the construction workers in Saudi Arabia are foreigners from several countries having different knowledge, skills and cultures. These create challenges to administer the workers in ensuring project success. This paper presents an initial investigation to uncover the challenges faced by construction professionals in managing construction workforce in Saudi Arabia. It describes insight processes of handling the workforce during planning stage, recruitment procedures and construction stage based on interview with senior manager who are well experienced in handling mega construction projects in Saudi Arabia. The interview was carried out in semi structured mode where the interviewee was given ample time to express the experiences encountered in dealing the workforce issue. This preliminary work able to identify among important issues related to construction workers are restrictions to non-Muslim skilled workers, limited visa quota, being away from family, delay in salary payment, cheating of workers skill’s status, safety issues, communication barriers and living conditions. Hence, these issues require quality leadership attributes such as continuous empathy with workers, respectful, trustful, sincere, reliable, good communication skills and problem solving skills. These findings are useful to construction practitioners and also research work related to construction leadership in handling worker’s issues.

  10. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  11. 46 CFR 127.110 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2014-10-01 2014-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...

  12. 46 CFR 127.110 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2012-10-01 2012-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...

  13. 46 CFR 127.110 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2013-10-01 2013-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...

  14. Extra-terrestrial construction processes - Advancements, opportunities and challenges

    NASA Astrophysics Data System (ADS)

    Lim, Sungwoo; Prabhu, Vibha Levin; Anand, Mahesh; Taylor, Lawrence A.

    2017-10-01

    Government space agencies, including NASA and ESA, are conducting preliminary studies on building alternative space-habitat systems for deep-space exploration. Such studies include development of advanced technologies for planetary surface exploration, including an in-depth understanding of the use of local resources. Currently, NASA plans to land humans on Mars in the 2030s. Similarly, other space agencies from Europe (ESA), Canada (CSA), Russia (Roscosmos), India (ISRO), Japan (JAXA) and China (CNSA) have already initiated or announced their plans for launching a series of lunar missions over the next decade, ranging from orbiters, landers and rovers for extended stays on the lunar surface. As the Space Odyssey is one of humanity's oldest dreams, there has been a series of research works for establishing temporary or permanent settlement on other planetary bodies, including the Moon and Mars. This paper reviews current projects developing extra-terrestrial construction, broadly categorised as: (i) ISRU-based construction materials; (ii) fabrication methods; and (iii) construction processes. It also discusses four categories of challenges to developing an appropriate construction process: (i) lunar simulants; (ii) material fabrication and curing; (iii) microwave-sintering based fabrication; and (iv) fully autonomous and scaled-up construction processes.

  15. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  16. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  17. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  18. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  19. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  20. Air Tight: Building Inflatables/Inflatable Construction: Planning and Details

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.

    2016-01-01

    A design-build seminar consisting of students from Physics, Mechanical and Civil Engineering, Robotic, Material Science, Art, and Architecture who will work together on a deployable "closed-loop" inflatable greenhouse for Mars in theory, and an Earth analogue physical mockup on campus.

  1. Environmental Learning Centers: A Template.

    ERIC Educational Resources Information Center

    Vozick, Eric

    1999-01-01

    Provides a working model, or template, for community-based environmental learning centers (ELCs). The template presents a philosophy as well as a plan for staff and administration operations, educational programming, and financial support. The template also addresses "green" construction and maintenance of buildings and grounds and…

  2. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  3. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  4. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  5. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  6. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  7. 7 CFR 1924.122 - Exception authority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Exception authority. 1924.122 Section 1924.122 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.122 Exception...

  8. 7 CFR 1924.103 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Scope. 1924.103 Section 1924.103 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.103 Scope. This subpart provides...

  9. Current Status of the Nuclear Waste Management Programme in Finland - 13441

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lehto, Kimmo; Vuorio, Petteri

    2013-07-01

    Pursuant to the Decision-in-Principle of 2001 the Finnish programme for geologic disposal of spent fuel has now moved to the phase of applying for construction licence to build up the encapsulation plant and underground repository. The main objective of former programme phase, underground characterisation phase, was to confirm - or refute - the suitability of the Olkiluoto site by investigations conducted underground at the actual depth of the repository. The construction work of the access tunnel to the rock characterisation facility (ONKALO) started in the late summer of 2004. The site research and investigations work aimed at the maturity neededmore » for submission of the application for construction license of the actual repository in end of 2012. This requires, however, that also the technology has reached the maturity needed. The design and technical plans form the necessary platform for the development of the safety case for spent fuel disposal. A plan, 'road map', has been produced for the portfolio of reports that demonstrates the safety of disposal as required by the criteria set by the government and further detailed by the safety authority, STUK. (authors)« less

  10. A Fast Goal Recognition Technique Based on Interaction Estimates

    NASA Technical Reports Server (NTRS)

    E-Martin, Yolanda; R-Moreno, Maria D.; Smith, David E.

    2015-01-01

    Goal Recognition is the task of inferring an actor's goals given some or all of the actor's observed actions. There is considerable interest in Goal Recognition for use in intelligent personal assistants, smart environments, intelligent tutoring systems, and monitoring user's needs. In much of this work, the actor's observed actions are compared against a generated library of plans. Recent work by Ramirez and Geffner makes use of AI planning to determine how closely a sequence of observed actions matches plans for each possible goal. For each goal, this is done by comparing the cost of a plan for that goal with the cost of a plan for that goal that includes the observed actions. This approach yields useful rankings, but is impractical for real-time goal recognition in large domains because of the computational expense of constructing plans for each possible goal. In this paper, we introduce an approach that propagates cost and interaction information in a plan graph, and uses this information to estimate goal probabilities. We show that this approach is much faster, but still yields high quality results.

  11. Scheduling of House Development Projects with CPM and PERT Method for Time Efficiency (Case Study: House Type 36)

    NASA Astrophysics Data System (ADS)

    Kholil, Muhammad; Nurul Alfa, Bonitasari; Hariadi, Madjumsyah

    2018-04-01

    Network planning is one of the management techniques used to plan and control the implementation of a project, which shows the relationship between activities. The objective of this research is to arrange network planning on house construction project on CV. XYZ and to know the role of network planning in increasing the efficiency of time so that can be obtained the optimal project completion period. This research uses descriptive method, where the data collected by direct observation to the company, interview, and literature study. The result of this research is optimal time planning in project work. Based on the results of the research, it can be concluded that the use of the both methods in scheduling of house construction project gives very significant effect on the completion time of the project. The company’s CPM (Critical Path Method) method can complete the project with 131 days, PERT (Program Evaluation Review and Technique) Method takes 136 days. Based on PERT calculation obtained Z = -0.66 or 0,2546 (from normal distribution table), and also obtained the value of probability or probability is 74,54%. This means that the possibility of house construction project activities can be completed on time is high enough. While without using both methods the project completion time takes 173 days. So using the CPM method, the company can save time up to 42 days and has time efficiency by using network planning.

  12. The application of micro UAV in construction project

    NASA Astrophysics Data System (ADS)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  13. Planning responds to gender violence: evidence from Spain, Mexico and the United States.

    PubMed

    Sweet, Elizabeth L; Escalante, Sara Ortiz

    2010-01-01

    Urban planning has been largely ineffective in addressing urban violence and particularly slow in responding to gender violence. This paper explores the public and private divide, structural inequalities, and issues of ethnicity and citizenship, in terms of their planning implications for gender violence. Drawing on evidence from Spain, Mexico and the United States, it examines how economic and social planning and gender violence intertwine. The three case studies demonstrate that the challenge is not only to break constructed structural inequalities and divisions between public and private spheres, but also to promote changes in the working models of institutions and organisations.

  14. The role of production and teamwork practices in construction safety: a cognitive model and an empirical case study.

    PubMed

    Mitropoulos, Panagiotis Takis; Cupido, Gerardo

    2009-01-01

    In construction, the challenge for researchers and practitioners is to develop work systems (production processes and teams) that can achieve high productivity and high safety at the same time. However, construction accident causation models ignore the role of work practices and teamwork. This study investigates the mechanisms by which production and teamwork practices affect the likelihood of accidents. The paper synthesizes a new model for construction safety based on the cognitive perspective (Fuller's Task-Demand-Capability Interface model, 2005) and then presents an exploratory case study. The case study investigates and compares the work practices of two residential framing crews: a 'High Reliability Crew' (HRC)--that is, a crew with exceptional productivity and safety over several years, and an average performing crew from the same company. The model explains how the production and teamwork practices generate the work situations that workers face (the task demands) and affect the workers ability to cope (capabilities). The case study indicates that the work practices of the HRC directly influence the task demands and match them with the applied capabilities. These practices were guided by the 'principle' of avoiding errors and rework and included work planning and preparation, work distribution, managing the production pressures, and quality and behavior monitoring. The Task Demand-Capability model links construction research to a cognitive model of accident causation and provides a new way to conceptualize safety as an emergent property of the production practices and teamwork processes. The empirical evidence indicates that the crews' work practices and team processes strongly affect the task demands, the applied capabilities, and the match between demands and capabilities. The proposed model and the exploratory case study will guide further discovery of work practices and teamwork processes that can increase both productivity and safety in construction operations. Such understanding will enable training of construction foremen and crews in these practices to systematically develop high reliability crews.

  15. The Pedagogical Structure of Methods for Thinking about the Future: The Citizens Function in Planning. Working Draft.

    ERIC Educational Resources Information Center

    Sandow, Stuart A.

    The principal problem of this work is to discover, perhaps construct, a pedagogical process for thinking about the future that makes use of the methods of forecasting, but makes use of them to create new attitudes and understandings on the part of institutional planners. The underlying concern is to develop a way for planners to address the future…

  16. Opportunities for Multidisciplinary Research in Partnership with Rock Engineers at the Deep Underground Science and Engineering Laboratory

    NASA Astrophysics Data System (ADS)

    Laughton, C.

    2008-12-01

    For the last half century the physics community has increasingly turned to the use of underground space to conduct basic research. The community is currently planning to conduct a new generation of underground experiments at the Deep Underground Science and Engineering Laboratory (DUSEL). DUSEL will be constructed within the footprint of the defunct Homestake Gold Mine, located in Lead, South Dakota. Physics proposals call for the construction of new caverns in which to conduct major new experiments. Some of the proposed laboratory facilities will be significantly larger and deeper than any previously constructed. The talk will highlight possible opportunities for integrating multi-disciplinary research in to the cavern construction program, and will stress the need to work closely with design and construction contractors to ensure that research goals can be achieve with minimal impact on project work. The constructors of large caverns should be particularly receptive to, and encouraging of geoscience research that could improve the engineering characterization of the rock mass. An improved understanding of the rock mass, as the host construction material, would result in a more reliable cavern design and construction process, and a reduced construction risk to the Project.

  17. Constructing a modern cytology laboratory: A toolkit for planning and design.

    PubMed

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A

    2013-01-01

    Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects.

  18. Constructing a modern cytology laboratory: A toolkit for planning and design

    PubMed Central

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A.

    2013-01-01

    Introduction: Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. Methods: The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. Results: The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Conclusions: Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects PMID:23599722

  19. School Building Organisation in Greece.

    ERIC Educational Resources Information Center

    PEB Exchange, 2001

    2001-01-01

    Discusses the past and current organizational structure of Greece's School Building Organisation, a body established to work with government agencies in the design and construction of new buildings and the provisioning of educational equipment. Future planning to incorporate culture and creativity, sports, and laboratory learning in modern school…

  20. Constructing the [Parochial] Global Citizen

    ERIC Educational Resources Information Center

    Salter, Peta; Halbert, Kelsey

    2017-01-01

    Cultural exchange is privileged in many higher education programs across the globe. The Australian government's New Colombo Plan refers to a "Third Wave" of globalisation which foregrounds global interrelatedness through developing student capabilities to live, work and contribute to global communities and aims to make the global an…

  1. 7 CFR 1924.119 - Site Loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Site Loans. 1924.119 Section 1924.119 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.119 Site Loans. Subdivisions...

  2. 7 CFR 1924.150 - OMB Control Number.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false OMB Control Number. 1924.150 Section 1924.150 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.150 OMB Control...

  3. Research on the spatial analysis method of seismic hazard for island

    NASA Astrophysics Data System (ADS)

    Jia, Jing; Jiang, Jitong; Zheng, Qiuhong; Gao, Huiying

    2017-05-01

    Seismic hazard analysis(SHA) is a key component of earthquake disaster prevention field for island engineering, whose result could provide parameters for seismic design microscopically and also is the requisite work for the island conservation planning’s earthquake and comprehensive disaster prevention planning macroscopically, in the exploitation and construction process of both inhabited and uninhabited islands. The existing seismic hazard analysis methods are compared in their application, and their application and limitation for island is analysed. Then a specialized spatial analysis method of seismic hazard for island (SAMSHI) is given to support the further related work of earthquake disaster prevention planning, based on spatial analysis tools in GIS and fuzzy comprehensive evaluation model. The basic spatial database of SAMSHI includes faults data, historical earthquake record data, geological data and Bouguer gravity anomalies data, which are the data sources for the 11 indices of the fuzzy comprehensive evaluation model, and these indices are calculated by the spatial analysis model constructed in ArcGIS’s Model Builder platform.

  4. Handbook on Architectural Services.

    ERIC Educational Resources Information Center

    Adams, Hugh D.; And Others

    Alabama State Building Commission policies and procedures are established for the use of all agencies, architects, and engineers working under the jurisdiction of the Commission. All school construction with the exception of mobile classroom units is covered, and general procedures are outlined followed by the requirements for plan submittals.…

  5. 23 CFR 635.105 - Supervising agency.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.105 Supervising agency. (a) The STD has responsibility... authorizing performance of the work by a local public agency or other Federal agency. The STD shall be... projects are completed in conformance with approved plans and specifications. (b) Although the STD may...

  6. 23 CFR 635.105 - Supervising agency.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.105 Supervising agency. (a) The STD has responsibility... authorizing performance of the work by a local public agency or other Federal agency. The STD shall be... projects are completed in conformance with approved plans and specifications. (b) Although the STD may...

  7. 23 CFR 635.105 - Supervising agency.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.105 Supervising agency. (a) The STD has responsibility... authorizing performance of the work by a local public agency or other Federal agency. The STD shall be... projects are completed in conformance with approved plans and specifications. (b) Although the STD may...

  8. 23 CFR 635.105 - Supervising agency.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.105 Supervising agency. (a) The STD has responsibility... authorizing performance of the work by a local public agency or other Federal agency. The STD shall be... projects are completed in conformance with approved plans and specifications. (b) Although the STD may...

  9. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...

  10. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...

  11. EXTENSION METHODS IDEAS FOR RURAL CIVIL DEFENSE.

    ERIC Educational Resources Information Center

    Department of Agriculture, Washington, DC.

    TECHNIQUES FOR INVOLVING THE RURAL POPULATION IN CIVIL DEFENSE PLANNING IS THE SUBJECT OF THIS DOCUMENT. AN INITIAL STEP INVOLVES DETERMINING THE VARIOUS COMMUNICATION SKILLS TO BE USED. METHODS OF WORKING WITH COMMUNITY ORGANIZATIONS, MASS MEDIA TECHNIQUES, AND CONSTRUCTION OF EXHIBITS ARE DESCRIBED. SMALL GROUP DISCUSSION TECHNIQUES EXPLAINED…

  12. 7 CFR 1924.106 - Location.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Location. 1924.106 Section 1924.106 Agriculture... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.106 Location. (a) General. It is... will not finance development on locations that adversely affect properties which are listed or are...

  13. Solar Schematic

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The home shown at right is specially designed to accommodate solar heating units; it has roof planes in four directions, allowing placement of solar collectors for best exposure to the sun. Plans (bottom) and complete working blueprints for the solar-heated house are being marketed by Home Building Plan Service, Portland, Oregon. The company also offers an inexpensive schematic (center) showing how a homeowner only moderately skilled in the use of tools can build his own solar energy system, applicable to new or existing structures. The schematic is based upon the design of a low-cost solar home heating system built and tested by NASA's Langley Research Center; used to supplement a warm-air heating system, it can save the homeowner about 40 percent of his annual heating bill for a modest investment in materials and components. Home Building Plan Service saved considerable research time by obtaining a NASA technical report which details the Langley work. The resulting schematic includes construction plans and simplified explanations of solar heat collection, collectors and other components, passive heat factors, domestic hot water supply and how to work with local heating engineers.

  14. Problems Related to the Siting of the Laboratory Building for Civil Engineering Department at the University of Warmia and Mazury in Olsztyn, Poland

    NASA Astrophysics Data System (ADS)

    Zagroba, Marek

    2016-10-01

    This paper deals with the conditions underlying and the problems arising from the siting of a building with specialist laboratories in a developed part of the university campus in Olsztyn, Poland. The topography of the terrain and the need to house civil engineering laboratories in the planned building had an immense impact on the shape of the building and consequently on its foundations, whose dimensions responded to the ground conditions and the specification of various loads they would have to support, including the equipment for the laboratories. The siting of a building as a step in the construction process entails several problems, which are first taken into consideration at the stage of making preliminary concept plans and are subsequently verified while working on the final construction plan. The required information included geotechnical documentation, survey of the ground conditions and the data regarding the predicted loads on the building, necessary to select the right type of foundations. All these problems grow in importance when dealing with such unique buildings like the discussed example of a laboratory building for the Civil Engineering Department, built on a site within a conservation zone on the campus of the University of Warmia and Mazury in Olsztyn, Poland. The specific character of the building and the specialist equipment with which it was to be furnished (a resistance testing machine, a 17-meter-long wave flume) necessitated a series of analyses prior to the siting of the building and selecting suitable foundations. In turn, the fact that the new building was to be erected in the conservation zone meant that collaboration with the Heritage Conservation Office had to be undertaken at the stage of making the plan and continued during the construction works. The Heritage Officer's recommendations concerning the building's shape, divisions, dimensions, materials used, etc., created a situation where the team of designers and architects had to become engaged in the process of landscape and spatial management. The above requirements concerned the functions of the building and its siting on a land parcel that was difficult to handle, also because of the protected trees growing there. Other constraints included the small size of this site, the developed surroundings, and the pre-defined programme of functions and use of the new building. On the other hand, the siting of the planned building had to be accommodated to the existing underground infrastructure (utilities). All the above circumstances made the task difficult and demanded good coordination between individual teams of engineers and architects, both at the stage of making the plan and during the construction works.

  15. Factors affecting construction performance: exploratory factor analysis

    NASA Astrophysics Data System (ADS)

    Soewin, E.; Chinda, T.

    2018-04-01

    The present work attempts to develop a multidimensional performance evaluation framework for a construction company by considering all relevant measures of performance. Based on the previous studies, this study hypothesizes nine key factors, with a total of 57 associated items. The hypothesized factors, with their associated items, are then used to develop questionnaire survey to gather data. The exploratory factor analysis (EFA) was applied to the collected data which gave rise 10 factors with 57 items affecting construction performance. The findings further reveal that the items constituting ten key performance factors (KPIs) namely; 1) Time, 2) Cost, 3) Quality, 4) Safety & Health, 5) Internal Stakeholder, 6) External Stakeholder, 7) Client Satisfaction, 8) Financial Performance, 9) Environment, and 10) Information, Technology & Innovation. The analysis helps to develop multi-dimensional performance evaluation framework for an effective measurement of the construction performance. The 10 key performance factors can be broadly categorized into economic aspect, social aspect, environmental aspect, and technology aspects. It is important to understand a multi-dimension performance evaluation framework by including all key factors affecting the construction performance of a company, so that the management level can effectively plan to implement an effective performance development plan to match with the mission and vision of the company.

  16. Analysis of offshore platforms lifting with fixed pile structure type (fixed platform) based on ASD89

    NASA Astrophysics Data System (ADS)

    Sugianto, Agus; Indriani, Andi Marini

    2017-11-01

    Platform construction GTS (Gathering Testing Sattelite) is offshore construction platform with fix pile structure type/fixed platform functioning to support the mining of petroleum exploitation. After construction fabrication process platform was moved to barges, then shipped to the installation site. Moving process is generally done by pull or push based on construction design determined when planning. But at the time of lifting equipment/cranes available in the work area then the moving process can be done by lifting so that moving activity can be implemented more quickly of work. This analysis moving process of GTS platform in a different way that is generally done to GTS platform types by lifting using problem is construction reinforcement required, so the construction can be moved by lifting with analyzing and checking structure working stress that occurs due to construction moving process by lifting AISC code standard and analysis using the SAP2000 structure analysis program. The analysis result showed that existing condition cannot be moved by lifting because stress ratio is above maximum allowable value that is 0.950 (AISC-ASD89). Overstress occurs on the member 295 and 324 with stress ratio value 0.97 and 0.95 so that it is required structural reinforcement. Box plate aplication at both members so that it produces stress ratio values 0.78 at the member 295 and stress ratio of 0.77 at the member 324. These results indicate that the construction have qualified structural reinforcement for being moved by lifting.

  17. Micro-Cycle Teaching Experiments as a Vehicle for Professional Development

    ERIC Educational Resources Information Center

    Billings, Esther M. H.; Kasmer, Lisa

    2015-01-01

    This study used design experiments, specifically micro-cycle teaching experiments (MTE) as a catalyst for practice-based professional development. The MTE incorporated research-based characteristics of effective professional development: it was embedded in the teachers' daily work of planning and enacting lessons, co-constructed with the…

  18. 75 FR 61180 - Notice of Availability of Funds and Solicitation for Grant Applications (SGA) for YouthBuild Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ... and training opportunities; opportunities for meaningful work and service to their communities; and... support, and their plan for providing education, skills training, and leadership development services to... cannot be used to support occupational skills training other than construction. Programs may offer...

  19. Interlinguistics and the Internet.

    ERIC Educational Resources Information Center

    Fettes, Mark

    1997-01-01

    Argues that the Internet offers new opportunities for the development, use, and study of planned languages. Notes that while most Web pages on "constructed" languages are the work of individual hobbyists, a few projects have small communities of users. The paper concludes that the use of Esperanto on the Internet reflects increased socialization…

  20. A Day at the Mall.

    ERIC Educational Resources Information Center

    Pfrogner, Lawrence D.

    1990-01-01

    "Be All that You Can Dream," a simulation workshop to teach entrepreneurship at Lorain County Joint Vocational School (Ohio), involves students in simulated planning, construction, and promotional activities for a shopping mall. Local business people observe and interview the students as they work, and the activity culminates in a tour,…

  1. 7 CFR Exhibit A to Subpart C of... - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false [Reserved] A Exhibit A to Subpart C of Part 1924 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work Exhibit A to Subpart C of...

  2. 32 CFR 644.3 - Navigation Projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Navigation Projects. 644.3 Section 644.3 National... HANDBOOK Project Planning Civil Works § 644.3 Navigation Projects. (a) Land to be acquired in fee. All... construction and borrow areas. (3) In navigation-only projects, the right to permanently flood should be...

  3. Gimme Shelter!: Doghouse Project Hones Construction Skills

    ERIC Educational Resources Information Center

    Shackelford, Ray; Griffis, Kurt

    2007-01-01

    In Rover's House project, students practice planning, measurement, layout, and processing skills in building a doghouse. The project is more than a doghouse--it is a learning activity that helps students develop and enhance their ability to work with reinforced concrete, steel and wood studs, trusses, roofing materials and a variety of…

  4. 32 CFR 644.3 - Navigation projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Navigation projects. 644.3 Section 644.3... ESTATE HANDBOOK Project Planning Civil Works § 644.3 Navigation projects. (a) Land to be acquired in fee..., and temporary construction and borrow areas. (3) In navigation-only projects, the right to permanently...

  5. 32 CFR 644.3 - Navigation projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Navigation projects. 644.3 Section 644.3 National... HANDBOOK Project Planning Civil Works § 644.3 Navigation projects. (a) Land to be acquired in fee. All... construction and borrow areas. (3) In navigation-only projects, the right to permanently flood should be...

  6. 32 CFR 644.3 - Navigation projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Navigation projects. 644.3 Section 644.3 National... HANDBOOK Project Planning Civil Works § 644.3 Navigation projects. (a) Land to be acquired in fee. All... construction and borrow areas. (3) In navigation-only projects, the right to permanently flood should be...

  7. Regeneration experiments below 10K in a regenerative-cycle cryocooler

    NASA Technical Reports Server (NTRS)

    Sager, R. E.; Paulson, D. N.

    1983-01-01

    At temperatures below 10K, regenerative cycle cryocoolers are limited by regeneration losses in the helium working fluid which result from the decreasing heat capacity of the regenerating material and the increasing density of helium. Experiments examining several approaches to improving the low-temperature regeneration in a four-stage regenerative cycle cooler constructed primarily of fiberglass materials are discussed. Using an interchangeable fourth stage, the experiments included configurations with multiple regeneration passages, and a static helium volume for increased heat capacity. Experiments using helium-3 as the working fluid and a Malone stage are planned. Results indicate that, using these techniques, it should be possible to construct a regenerative cycle cooler which will operate below 6K.

  8. Evaluation of Acquisition Strategies for Image-Based Construction Site Monitoring

    NASA Astrophysics Data System (ADS)

    Tuttas, S.; Braun, A.; Borrmann, A.; Stilla, U.

    2016-06-01

    Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM). The BIM contains the as-planned states (geometry, schedule, costs, ...) of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i) terrestrial acquisition with a hand-held camera, (ii) aerial acquisition using a Unmanned Aerial Vehicle (UAV) and (iii) acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane camera approach has the potential to reach the same accuracy level.

  9. Urban Climate Map System for Dutch spatial planning

    NASA Astrophysics Data System (ADS)

    Ren, Chao; Spit, Tejo; Lenzholzer, Sanda; Yim, Hung Lam Steve; Heusinkveld, Bert; van Hove, Bert; Chen, Liang; Kupski, Sebastian; Burghardt, René; Katzschner, Lutz

    2012-08-01

    Facing climate change and global warming, outdoor climatic environment is an important consideration factor for planners and policy makers because improving it can greatly contribute to achieve citizen's thermal comfort and create a better urban living quality for adaptation. Thus, the climatic information must be assessed systematically and applied strategically into the planning process. This paper presents a tool named Urban Climate Map System (UCMS) that has proven capable of helping compact cities to incorporate climate effects in planning processes in a systematic way. UCMS is developed and presented in a Geographic Information System (GIS) platform in which the lessons learned and experience gained from interdisciplinary studies can be included. The methodology of UCMS of compact cities, the construction procedure, and the basic input factors - including the natural climate resources and planning data - are described. Some literatures that shed light on the applicability of UMCS are reported. The Municipality of Arnhem is one of Dutch compact urban areas and still under fast urban development and urban renewal. There is an urgent need for local planners and policy makers to protect local climate and open landscape resources and make climate change adaptation in urban construction. Thus, Arnhem is chosen to carry out a case study of UCMS. Although it is the first work of Urban Climatic Mapping in The Netherlands, it serves as a useful climatic information platform to local planners and policy makers for their daily on-going works. We attempt to use a quick method to collect available climatic and planning data and create an information platform for planning use. It relies mostly on literature and theoretical understanding that has been well practiced elsewhere. The effort here is to synergize the established understanding for a case at hand and demonstrate how useful guidance can still be made for planners and policy makers.

  10. Efficient Project Delivery Using Lean Principles - An Indian Case Study

    NASA Astrophysics Data System (ADS)

    Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya

    2016-03-01

    Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.

  11. Manned remote work station development article. Volume 3: Development test plan. Appendix A: Manufacturing requirements/schedule

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The tests and procedures for the manned remote work station (MRWS) open cherry picker (OCP) development test article (DTA) are described to validate systems requirements and performance specifications. A development test program is outlined to evaluate key design issues and man/machine interfaces when the MRWS OCP is used in a shuttle support role of satellite servicing and in orbit construction of large structures.

  12. Communication of Ergonomics in building and construction.

    PubMed

    Wiberg, Viveca

    2012-01-01

    For the coming years SWEA is planning for communication and information actions. One of the sectors concerned is the building and construction industry. Focus of the information is to avoid accidents and injuries, and how companies by themselves can prevent risks. The objective of the information is to increase awareness among all stakeholders in order to secure that they are willing and able to reduce risks for workers. At the conference two brochures will be presented. They are designed to provide information and knowledge about specific risks of occupational accidents and occupational diseases which occur frequently during construction work and how they can be prevented. They are directed to all those who are involved in the construction process at different stages and who are subject to SWEAs rules and regulations. New identified risk groups are e.g. students, apprentices, self-employed, and foreign workers temporarily working in Sweden. We also see that work is still being carried out in narrow installation spaces during erection stage of buildings because the people responsible for the drawings do not take notice of the need for sufficient space to do the work. SWEA experienced that it is difficult to reach all the groups concerned with the message about how to avoid injuries and unnecessary musculoskeletal disorders.

  13. A knowledge-based approach to automated planning for hepatocellular carcinoma.

    PubMed

    Zhang, Yujie; Li, Tingting; Xiao, Han; Ji, Weixing; Guo, Ming; Zeng, Zhaochong; Zhang, Jianying

    2018-01-01

    To build a knowledge-based model of liver cancer for Auto-Planning, a function in Pinnacle, which is used as an automated inverse intensity modulated radiation therapy (IMRT) planning system. Fifty Tomotherapy patients were enrolled to extract the dose-volume histograms (DVHs) information and construct the protocol for Auto-Planning model. Twenty more patients were chosen additionally to test the model. Manual planning and automatic planning were performed blindly for all twenty test patients with the same machine and treatment planning system. The dose distributions of target and organs at risks (OARs), along with the working time for planning, were evaluated. Statistically significant results showed that automated plans performed better in target conformity index (CI) while mean target dose was 0.5 Gy higher than manual plans. The differences between target homogeneity indexes (HI) of the two methods were not statistically significant. Additionally, the doses of normal liver, left kidney, and small bowel were significantly reduced with automated plan. Particularly, mean dose and V15 of normal liver were 1.4 Gy and 40.5 cc lower with automated plans respectively. Mean doses of left kidney and small bowel were reduced with automated plans by 1.2 Gy and 2.1 Gy respectively. In contrast, working time was also significantly reduced with automated planning. Auto-Planning shows availability and effectiveness in our knowledge-based model for liver cancer. © 2017 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.

  14. Manual of Regulations and Recommendations for School Building Planning and Construction.

    ERIC Educational Resources Information Center

    Engelking, D. F.

    Recommendations and suggestions, as well as statutory provisions and state board regulations, are presented regarding school building construction in Idaho. The material is organized into the following sections--(1) school building planning, (2) the school site, (3) construction planning and requirements, (4) secondary school planning, (5)…

  15. Core and Off-Core Processes in Systems Engineering

    NASA Technical Reports Server (NTRS)

    Breidenthal, Julian; Forsberg, Kevin

    2010-01-01

    An emerging methodology of organizing systems-engineering plans is based on a concept of core and off-core processes or activities. This concept has emerged as a result of recognition of a risk in the traditional representation of systems-engineering plans by a Vee model alone, according to which a large system is decomposed into levels of smaller subsystems, then integrated through levels of increasing scope until the full system is constructed. Actual systems-engineering activity is more complicated, raising the possibility that the staff will become confused in the absence of plans which explain the nature and ordering of work beyond the traditional Vee model.

  16. Using AI Planning Techniques to Automatically Generate Image Processing Procedures: A Preliminary Report

    NASA Technical Reports Server (NTRS)

    Chien, S.

    1994-01-01

    This paper describes work on the Multimission VICAR Planner (MVP) system to automatically construct executable image processing procedures for custom image processing requests for the JPL Multimission Image Processing Lab (MIPL). This paper focuses on two issues. First, large search spaces caused by complex plans required the use of hand encoded control information. In order to address this in a manner similar to that used by human experts, MVP uses a decomposition-based planner to implement hierarchical/skeletal planning at the higher level and then uses a classical operator based planner to solve subproblems in contexts defined by the high-level decomposition.

  17. Multi-day activity scheduling reactions to planned activities and future events in a dynamic model of activity-travel behavior

    NASA Astrophysics Data System (ADS)

    Nijland, Linda; Arentze, Theo; Timmermans, Harry

    2014-01-01

    Modeling multi-day planning has received scarce attention in activity-based transport demand modeling so far. However, new dynamic activity-based approaches are being developed at the current moment. The frequency and inflexibility of planned activities and events in activity schedules of individuals indicate the importance of incorporating those pre-planned activities in the new generation of dynamic travel demand models. Elaborating and combining previous work on event-driven activity generation, the aim of this paper is to develop and illustrate an extension of a need-based model of activity generation that takes into account possible influences of pre-planned activities and events. This paper describes the theory and shows the results of simulations of the extension. The simulation was conducted for six different activities, and the parameter values used were consistent with an earlier estimation study. The results show that the model works well and that the influences of the parameters are consistent, logical, and have clear interpretations. These findings offer further evidence of face and construct validity to the suggested modeling approach.

  18. Preliminary study on enhancing waste management best practice model in Malaysia construction industry

    NASA Astrophysics Data System (ADS)

    Jamaludin, Amril Hadri; Karim, Nurulzatushima Abdul; Noor, Raja Nor Husna Raja Mohd; Othman, Nurulhidayah; Malik, Sulaiman Abdul

    2017-08-01

    Construction waste management (CWM) is the practice of minimizing and diverting construction waste, demolition debris, and land-clearing debris from disposal and redirecting recyclable resources back into the construction process. Best practice model means best choice from the collection of other practices that was built for purpose of construction waste management. The practice model can help the contractors in minimizing waste before the construction activities will be started. The importance of minimizing wastage will have direct impact on time, cost and quality of a construction project. This paper is focusing on the preliminary study to determine the factors of waste generation in the construction sites and identify the effectiveness of existing construction waste management practice conducted in Malaysia. The paper will also include the preliminary works of planned research location, data collection method, and analysis to be done by using the Analytical Hierarchy Process (AHP) to help in developing suitable waste management best practice model that can be used in the country.

  19. Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lum, Clinton C. L.

    This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Workmore » Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.« less

  20. How To Build It and Keep It Working.

    ERIC Educational Resources Information Center

    Crane, H. Richard

    This book contains construction plans of exhibits that have been collected during more than 10 years, and notes for their maintenance, at the Ann Arbor (Michigan) Hands-On museum. It is a useful source of hard-to-find information for exhibit builders, science fair participants, science teachers, students, and home tinkerers. This collection…

  1. 7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...

  2. 7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...

  3. 7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...

  4. 7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...

  5. 7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...

  6. 18 CFR 4.81 - Contents of application.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., or State, as appropriate] and (is/is not) claiming preference under section 7(a) of the Federal Power... approximate locations and nature of any new roads that would be built for the purpose of conducting the studies; and (2) Work plan for new dam construction. For any development within the project that would...

  7. 18 CFR 4.81 - Contents of application.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., or State, as appropriate] and (is/is not) claiming preference under section 7(a) of the Federal Power... and nature of any new roads that would be built for the purpose of conducting the studies; and (2) Work plan for new dam construction. For any development within the project that would entail new dam...

  8. Developing a Master Plan for Your School. School Buildings Planning, Design, and Construction Series No. 1.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on how to set up a master planning team and establish a plan for quickly completing the building process. It provides an overview of…

  9. Planning and managing future space facility projects. [management by objectives and group dynamics

    NASA Technical Reports Server (NTRS)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  10. 46 CFR 110.25-1 - Plans and information required for new construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Plans and information required for new construction. 110.25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction...

  11. 46 CFR 110.25-1 - Plans and information required for new construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Plans and information required for new construction. 110.25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction...

  12. DE-EE0006714 Final Report-Project Icebreaker™

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Lorry; Karpinski, David; Nagusky, Beth

    Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less

  13. Cedar-a large scale multiprocessor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gajski, D.; Kuck, D.; Lawrie, D.

    1983-01-01

    This paper presents an overview of Cedar, a large scale multiprocessor being designed at the University of Illinois. This machine is designed to accommodate several thousand high performance processors which are capable of working together on a single job, or they can be partitioned into groups of processors where each group of one or more processors can work on separate jobs. Various aspects of the machine are described including the control methodology, communication network, optimizing compiler and plans for construction. 13 references.

  14. Reverse logistics in the Brazilian construction industry.

    PubMed

    Nunes, K R A; Mahler, C F; Valle, R A

    2009-09-01

    In Brazil most Construction and Demolition Waste (C&D waste) is not recycled. This situation is expected to change significantly, since new federal regulations oblige municipalities to create and implement sustainable C&D waste management plans which assign an important role to recycling activities. The recycling organizational network and its flows and components are fundamental to C&D waste recycling feasibility. Organizational networks, flows and components involve reverse logistics. The aim of this work is to introduce the concepts of reverse logistics and reverse distribution channel networks and to study the Brazilian C&D waste case.

  15. Reilly working on ISS construction during STS-117 EVA1

    NASA Image and Video Library

    2007-06-12

    ISS015-E-11858 (11 June 2007) --- Astronauts Jim Reilly and John "Danny" Olivas (visible among Reilly's helmet reflections), both STS-117 mission specialists, participate in the mission's first planned session of extravehicular activity (EVA), as construction resumes on the International Space Station. Among other tasks, Reilly and Olivas connected power, data and cooling cables between S1 and S3; released the launch restraints from and deployed the four solar array blanket boxes on S4 and released the cinches and winches holding the photovoltaic radiator on S4.

  16. View of Forrester working on ISS construction during STS-117 EVA2

    NASA Image and Video Library

    2007-06-13

    ISS015-E-12018 (13 June 2007) --- Anchored to a foot restraint on the Space Station Remote Manipulator System (SSRMS) or Canadarm2, astronaut Patrick Forrester, STS-117 mission specialist, participates in the mission's second planned session of extravehicular activity (EVA), as construction resumes on the International Space Station. Among other tasks, Forrester and astronaut Steven Swanson (out of frame), mission specialist, removed all of the launch locks holding the 10-foot-wide solar alpha rotary joint in place and began the solar array retraction.

  17. Department of the Air Force. FY 1995 Budget Estimates. Military Construction and Family Housing

    DTIC Science & Technology

    1994-02-01

    monorail lift systems and provide AFFF fire protection system, and elevators. Renovate engineering and work areas; provide new air make-up unit and...135,0U0 SY 1,200 880-212 AFFF FIRE SUPPRESSION SYSTEM LS 800 FOR FUEL CELL TOTAL: 10,450 9b. Future Projects: Typical Planned Next Three Years: 111...PROTECT 2 EA 3,600 PH II & AFFF PUMPS/RESERVOIR TOTAL: 27,900 9b. Future Projects: Typical Planned Next Three Years: 442-758 WAREHOUSE 107,000 SF

  18. Advanced construction management for lunar base construction - Surface operations planner

    NASA Technical Reports Server (NTRS)

    Kehoe, Robert P.

    1992-01-01

    The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

  19. Ranking the effects of urban development projects on social determinants of health: health impact assessment.

    PubMed

    Shojaei, Parisa; Karimlou, Masoud; Nouri, Jafar; Mohammadi, Farahnaz; Malek Afzali, Hosein; Forouzan, Ameneh Setareh

    2014-05-30

    Health impact assessment (HIA) offer a very logical and interesting approach for those aiming to integrate health issues into planning processes. With a lot of works and plans waiting to be done (e.g., developing and updating plans, counseling planning commissions, cooperation with other organizations), planners find it difficult to prioritize health among a variety of possible issues and solutions they confront. In the present article, first, the list of social determinants of health associated with Chitgar man-made lake was extracted out using a qualitative method and with content analysis approach, and then they were prioritized using analytic hierarchy process. 28 social determinants of health including "intermediary" and "structural" determinants were extracted out. Regarding positive effects of lake on these determinants, "recreational services" and "traffic" received the highest and the lowest weights with 0.895 and 0.638 respectively among structural determinants and with consideration to "construction" option. Furthermore, among intermediary determinants for "construction" option, sub-criteria of both "physical activity" and "air quality" received the final highest weight (0.889) and "pathogenesis" indicated the lowest weight with 0.617. Moreover, lake demonstrated the highest negative effects on "housing" among "structural" determinants which it takes the highest weight (0.476) in "non-construction" option. Additionally, lake had the highest negative effects on "noise pollution" among "intermediary determinants" and it takes the highest weight (0.467) in "non-construction" option. It has been shown that urban development projects such as green spaces, man-made lakes … have a huge range of effects on community's health, and having not considered these effects by urban planners and mangers is going to confront urban health with many challenges.

  20. 7 CFR 1942.9 - Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... §§ 1942.17(p) and 1942.18] 1942.9 Section 1942.9 Agriculture Regulations of the Department of...) ASSOCIATIONS Community Facility Loans § 1942.9 Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18] (a) Review of construction plans and specifications. All plans and specifications...

  1. 7 CFR 1942.9 - Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18] 1942.9 Section 1942.9 Agriculture Regulations of the Department of....17(p) and 1942.18] (a) Review of construction plans and specifications. All plans and specifications...

  2. 7 CFR 1942.9 - Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18] 1942.9 Section 1942.9 Agriculture Regulations of the Department of....17(p) and 1942.18] (a) Review of construction plans and specifications. All plans and specifications...

  3. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  4. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  5. Use of Program Theory in a Nutrition Program for Grandchildren and Grandparents

    ERIC Educational Resources Information Center

    Koenings, Mallory; Arscott, Sara

    2013-01-01

    Grandparents University ® (GPU) is a 2-day campus-based nutrition education program for grandparents and grandchildren based on constructs from Social Cognitive Theory and the Theory of Planned Behavior. This article describes how program theory was used to develop a working model, design activities, and select outcome measures of a 2-day…

  6. Constructing Education as Human Capital in a Transitional Society: A Case Study of Somaliland's Education Reconstruction

    ERIC Educational Resources Information Center

    Ahmed, Hassan; Bradford, Simon

    2011-01-01

    The purpose of this article is to critically examine Somaliland's post-conflict education reconstruction. The work includes documentary analysis of the Somaliland Education Policy. The authors also draw on the National Teacher Education Policy and the Somaliland National Education Development Plan. The analysis of these documents is primarily…

  7. Availability analysis of an HTGR fuel recycle facility. Summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sharmahd, J.N.

    1979-11-01

    An availability analysis of reprocessing systems in a high-temperature gas-cooled reactor (HTGR) fuel recycle facility was completed. This report summarizes work done to date to define and determine reprocessing system availability for a previously planned HTGR recycle reference facility (HRRF). Schedules and procedures for further work during reprocessing development and for HRRF design and construction are proposed in this report. Probable failure rates, transfer times, and repair times are estimated for major system components. Unscheduled down times are summarized.

  8. Study on the methods of rational analysis about the area of the Planning of Sea Usage of Regional Construction

    NASA Astrophysics Data System (ADS)

    Ya-Juan, Li; Tian-Yu, Mao; Mingjing-Tian

    2018-03-01

    The Planning of Sea Usage of Regional Construction is a new area, and the rational analysis about the area of which is one of its difficulties. Based on “Urban land classification and land use planning and construction standards”, the land use control index method study the rationality of the sea usage area of the whole region, by accumulating for specific land use indicators for each land type within the planning area. This paper, takeing the project named “caofeidian integrated service area” for example, make a little study on the land use control index method used by the sea usage demonstration of the planning of sea usage of regional construction. The study will be good for improving the technical methods of rational analysis about the area of the planning of sea usage of regional construction.

  9. 7 CFR 3560.71 - Construction financing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Construction financing. 3560.71 Section 3560.71... Construction financing. (a) Construction financing plan. Prior to loan approval, applicants must submit to the Agency for its concurrence a plan for the construction financing and securing of the loan. (b) Interim...

  10. 7 CFR 3560.71 - Construction financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Construction financing. 3560.71 Section 3560.71... Construction financing. (a) Construction financing plan. Prior to loan approval, applicants must submit to the Agency for its concurrence a plan for the construction financing and securing of the loan. (b) Interim...

  11. 7 CFR 3560.71 - Construction financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Construction financing. 3560.71 Section 3560.71... Construction financing. (a) Construction financing plan. Prior to loan approval, applicants must submit to the Agency for its concurrence a plan for the construction financing and securing of the loan. (b) Interim...

  12. 77 FR 18990 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... reviewing and acting on specific air quality construction permit applications received by the New Mexico... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... replace existing rules, and revisions to the applicable State Implementation Plan (SIP) for New Mexico...

  13. Planning Construction Research of Modern Urban Landscape

    NASA Astrophysics Data System (ADS)

    Xiao, Z. Q.; Chen, W.

    With the development and expansion of the city's traditional urban landscape planning methods have been difficult to adapt to the requirements of modern urban development, in the new urban construction, planning what kind of urban landscape is a new research topic. The article discusses the principles of modern urban landscape planning and development, promote the adoption of new concepts and theories, building more regional characteristics, more humane, more perfect, more emphasis on urban landscape pattern natural ecological protection and construction can sustainable development of urban living environment, and promote the development and construction of the city.

  14. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  15. Construction and Utilization of a Beowulf Computing Cluster: A User's Perspective

    NASA Technical Reports Server (NTRS)

    Woods, Judy L.; West, Jeff S.; Sulyma, Peter R.

    2000-01-01

    Lockheed Martin Space Operations - Stennis Programs (LMSO) at the John C Stennis Space Center (NASA/SSC) has designed and built a Beowulf computer cluster which is owned by NASA/SSC and operated by LMSO. The design and construction of the cluster are detailed in this paper. The cluster is currently used for Computational Fluid Dynamics (CFD) simulations. The CFD codes in use and their applications are discussed. Examples of some of the work are also presented. Performance benchmark studies have been conducted for the CFD codes being run on the cluster. The results of two of the studies are presented and discussed. The cluster is not currently being utilized to its full potential; therefore, plans are underway to add more capabilities. These include the addition of structural, thermal, fluid, and acoustic Finite Element Analysis codes as well as real-time data acquisition and processing during test operations at NASA/SSC. These plans are discussed as well.

  16. LDRD project final report : hybrid AI/cognitive tactical behavior framework for LVC.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Djordjevich, Donna D.; Xavier, Patrick Gordon; Brannon, Nathan Gregory

    This Lab-Directed Research and Development (LDRD) sought to develop technology that enhances scenario construction speed, entity behavior robustness, and scalability in Live-Virtual-Constructive (LVC) simulation. We investigated issues in both simulation architecture and behavior modeling. We developed path-planning technology that improves the ability to express intent in the planning task while still permitting an efficient search algorithm. An LVC simulation demonstrated how this enables 'one-click' layout of squad tactical paths, as well as dynamic re-planning for simulated squads and for real and simulated mobile robots. We identified human response latencies that can be exploited in parallel/distributed architectures. We did an experimentalmore » study to determine where parallelization would be productive in Umbra-based force-on-force (FOF) simulations. We developed and implemented a data-driven simulation composition approach that solves entity class hierarchy issues and supports assurance of simulation fairness. Finally, we proposed a flexible framework to enable integration of multiple behavior modeling components that model working memory phenomena with different degrees of sophistication.« less

  17. 46 CFR 126.330 - Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Plans. 126.330 Section 126.330 Shipping COAST GUARD... Inspection § 126.330 Plans. Before construction starts, the owner, operator, or builder shall develop plans indicating the proposed arrangement and construction of the vessel. (The list of plans to be developed and...

  18. The cost risk implementation on design-build project of integrated public spaces child friendly in capital of Jakarta

    NASA Astrophysics Data System (ADS)

    Mardiaman, Mubarok, Abdul

    2017-11-01

    Jakarta area of 662.33 km2 with a population of 10,075,030 inhabitants and green open spaces 9.98%. The Jakarta government built a child-friendly integrated open space as facilities for playing. Providing of facilities was hoped suitable with time, cost, quality, accountability and proper financial governance. Based on the PU ministerial regulation number 19/PRT/M/2015 on the standards and guidelines for procurement the design and construction work on the integrated build and the PU ministerial regulation No. 07/PRT/M/2011 on standards and guidelines for procurement of construction works and consulting services of public works and the ministry of housing. RPTRA development at 123 locations in Jakarta was implemented base on the contract of design and build. The design study was influenced by the cost elements; the main strength (expert), skilled personnel, support personnel, major equipment and support. The construction fee relies on; expert implementation, hardware implementation, preparation work, land, buildings, courtyards, fences, complementary and governance capabilities for human resources in completing the construction activities to minimize the cost risk. Montecarlo simulations was conducted to determine the average unit price, model and analyze systems. In the cost contract, the percentage of design work stipulated 2.5%, build 97.5%. Base on regulation the minister of public work for design work cost 2.72%, build 97.28%. Then, actual cost for design 2.67% and build 97.33%. From the three reference was shown that there are differentiation one another. The acceleration of planning able to make the cost and time more efficient that impact on the implementation margin.

  19. Olivas working on ISS construction during STS-117 EVA1

    NASA Image and Video Library

    2007-06-12

    ISS015-E-11830 (11 June 2007) --- Astronauts John "Danny" Olivas and Jim Reilly (out of frame), both STS-117 mission specialists, participate in the mission's first planned session of extravehicular activity (EVA), as construction resumes on the International Space Station. Among other tasks, Reilly and Olivas connected power, data and cooling cables between S1 and S3; released the launch restraints from and deployed the four solar array blanket boxes on S4 and released the cinches and winches holding the photovoltaic radiator on S4. A blue and white Earth provided the backdrop for the scene.

  20. Olivas working on ISS construction during STS-117 EVA1

    NASA Image and Video Library

    2007-06-12

    ISS015-E-11831 (11 June 2007) --- Astronauts John "Danny" Olivas and Jim Reilly (out of frame), both STS-117 mission specialists, participate in the mission's first planned session of extravehicular activity (EVA), as construction resumes on the International Space Station. Among other tasks, Reilly and Olivas connected power, data and cooling cables between S1 and S3; released the launch restraints from and deployed the four solar array blanket boxes on S4 and released the cinches and winches holding the photovoltaic radiator on S4. A blue and white Earth provided the backdrop for the scene.

  1. [The construction process of managerial profile competencies for nurse coordinators in the hospital field].

    PubMed

    Manenti, Simone Alexandra; Ciampone, Maria Helena Trench; Mira, Vera Lucia; Minami, Lígia Fumiko; Soares, Jaqueline Maria Sousa

    2012-06-01

    The objective of this study was to construct a profile of managerial competencies, based on the consensus of nurse coordinators in the field. This study was developed in a philanthropic hospital in São Paulo, following the research-action model, and included 13 nurse coordinators as participants. The data collection was performed using the focal group technique. Data analysis was performed using the theoretical frameworks related to the working process and managerial competencies. The results identified the greater emphasis assigned to the competencies related to the mentor, coordinator and director roles. It was, therefore, possible to construct a professional development plan that is based on competencies in the technical, ethical-political, and communicative domains, as well as the development of citizenship. The analysis of the managerial working process and the study of the competencies within the managerial environment were shown to be important, because they highlighted the professionals' need to improve, thus fulfilling personal, professional, and organizational demands.

  2. Assessment of Work Climates: The Appropriateness of Classical-Management Theory and Human-Relations Theory under Various Contingencies. Final Report.

    ERIC Educational Resources Information Center

    Langdale, John A.

    The construct of "organizational climate" was explicated and various ways of operationalizing it were reviewed. A survey was made of the literature pertinent to the classical-human relations dimension of environmental quality. As a result, it was hypothesized that the appropriateness of the classical and human-relations master plans is moderated…

  3. What's the Technology For? Teacher Attention and Pedagogical Goals in a Modeling-Focused Professional Development Workshop

    ERIC Educational Resources Information Center

    Wilkerson, Michelle Hoda; Andrews, Chelsea; Shaban, Yara; Laina, Vasiliki; Gravel, Brian E.

    2016-01-01

    This paper explores the role that technology can play in engaging pre-service teachers with the iterative, "messy" nature of model-based inquiry. Over the course of 5 weeks, 11 pre-service teachers worked in groups to construct models of diffusion using a computational animation and simulation toolkit, and designed lesson plans for the…

  4. Paving the Road for Student Success: Building a Case for Integrated Strategic Planning from Pre-K to Post-Doc

    ERIC Educational Resources Information Center

    Kealey, Jarrett; Peterson, Renee; Thompson, Angela; Waters, Kristin

    2015-01-01

    The road from prekindergarten (pre-K) to post-doctoral (post-doc) work is riddled with potholes, detours, u-turns, and construction zones. National education initiatives such as No Child Left Behind, the Common Core, Race to the Top, Performance-Based Funding, College Readiness and Completion Acts, and Post-Graduate Gainful Employment Reports…

  5. Intelligent Agent Architectures: Reactive Planning Testbed

    NASA Technical Reports Server (NTRS)

    Rosenschein, Stanley J.; Kahn, Philip

    1993-01-01

    An Integrated Agent Architecture (IAA) is a framework or paradigm for constructing intelligent agents. Intelligent agents are collections of sensors, computers, and effectors that interact with their environments in real time in goal-directed ways. Because of the complexity involved in designing intelligent agents, it has been found useful to approach the construction of agents with some organizing principle, theory, or paradigm that gives shape to the agent's components and structures their relationships. Given the wide variety of approaches being taken in the field, the question naturally arises: Is there a way to compare and evaluate these approaches? The purpose of the present work is to develop common benchmark tasks and evaluation metrics to which intelligent agents, including complex robotic agents, constructed using various architectural approaches can be subjected.

  6. FIRE STATION AND GUARD HOUSE, PLANS AND DETAILS. Plan No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRE STATION AND GUARD HOUSE, PLANS AND DETAILS. Plan No. 6754-319, dated August 1, 1933. Construction Division, Office of the Constructing Quartermaster - Hamilton Field, Fire Station & Guard House, Southwest corner of Seventh Street & Hangar Avenue, Novato, Marin County, CA

  7. Automated geospatial Web Services composition based on geodata quality requirements

    NASA Astrophysics Data System (ADS)

    Cruz, Sérgio A. B.; Monteiro, Antonio M. V.; Santos, Rafael

    2012-10-01

    Service-Oriented Architecture and Web Services technologies improve the performance of activities involved in geospatial analysis with a distributed computing architecture. However, the design of the geospatial analysis process on this platform, by combining component Web Services, presents some open issues. The automated construction of these compositions represents an important research topic. Some approaches to solving this problem are based on AI planning methods coupled with semantic service descriptions. This work presents a new approach using AI planning methods to improve the robustness of the produced geospatial Web Services composition. For this purpose, we use semantic descriptions of geospatial data quality requirements in a rule-based form. These rules allow the semantic annotation of geospatial data and, coupled with the conditional planning method, this approach represents more precisely the situations of nonconformities with geodata quality that may occur during the execution of the Web Service composition. The service compositions produced by this method are more robust, thus improving process reliability when working with a composition of chained geospatial Web Services.

  8. SCHOOLS OF PRESTRESSED CONCRETE. PLANNING, DESIGN AND CONSTRUCTION OF EDUCATIONAL FACILITIES FOR SCHOOLS AND COLLEGES.

    ERIC Educational Resources Information Center

    LYMAN, ROBERT J.

    THE USE OF PRESTRESSED CONCRETE IS EMPHASIZED IN THE AREAS OF SCHOOL PLANNING, DESIGN, AND CONSTRUCTION. THE PLANNING SECTION INCLUDES--(1) ROLES OF ACTIVE PARTIES AND RELATED ORGANIZATIONS, (2) PROCEDURES, AND (3) CONCEPTUAL DATA FOR SITE AND BUILDING. THE DESIGN SECTION CONTAINS--(1) DEVELOPMENT OF CONSTRUCTION SYSTEMS, (2) INTEGRATION OF…

  9. CAP: Construction Assistance Plan. Handbook for Construction Project Planning, Oregon Community Colleges.

    ERIC Educational Resources Information Center

    Duncan, Verne A.

    This handbook for construction project planning was developed to be used by the Oregon Department of Education to evaluate existing facilities and determine the projected needs for each of the community college districts. Each college district's eligibility for state participation in funding is based on a Basic Space Need (BSN) which is the square…

  10. 25 CFR 170.405 - Can tribal transportation planning funds be used for road construction and other projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can tribal transportation planning funds be used for road construction and other projects? 170.405 Section 170.405 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian...

  11. 25 CFR 170.404 - What happens when a tribe uses its IRR Program construction funds for transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens when a tribe uses its IRR Program construction funds for transportation planning? 170.404 Section 170.404 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction...

  12. Intelligent robots for planetary exploration and construction

    NASA Technical Reports Server (NTRS)

    Albus, James S.

    1992-01-01

    Robots capable of practical applications in planetary exploration and construction will require realtime sensory-interactive goal-directed control systems. A reference model architecture based on the NIST Real-time Control System (RCS) for real-time intelligent control systems is suggested. RCS partitions the control problem into four basic elements: behavior generation (or task decomposition), world modeling, sensory processing, and value judgment. It clusters these elements into computational nodes that have responsibility for specific subsystems, and arranges these nodes in hierarchical layers such that each layer has characteristic functionality and timing. Planetary exploration robots should have mobility systems that can safely maneuver over rough surfaces at high speeds. Walking machines and wheeled vehicles with dynamic suspensions are candidates. The technology of sensing and sensory processing has progressed to the point where real-time autonomous path planning and obstacle avoidance behavior is feasible. Map-based navigation systems will support long-range mobility goals and plans. Planetary construction robots must have high strength-to-weight ratios for lifting and positioning tools and materials in six degrees-of-freedom over large working volumes. A new generation of cable-suspended Stewart platform devices and inflatable structures are suggested for lifting and positioning materials and structures, as well as for excavation, grading, and manipulating a variety of tools and construction machinery.

  13. Construction Methods and Materials. School Buildings Planning, Design, and Construction Series No. 5.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on the various types of construction that may be used, the materials available, and some elementary aspects of the services required…

  14. Standard road plans [English version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed : to show standardized design features, construction methods and approved : materials to be used in design plans for Interstate, Primary, and Secondary : road construction in th...

  15. Standard road plans : metric [version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed : to show standardized design features, construction methods and approved : materials to be used in design plans for Interstate, Primary, and Secondary : road construction in th...

  16. 78 FR 54813 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...] Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit Program Fee Increases; Construction Permit Regulation of PM 2.5 ; Regulation 3 AGENCY: Environmental Protection Agency... construction permit processing fees. EPA proposes approval of Colorado's May 25, 2011 submittal, which...

  17. Supplement Analysis for the Watershed Management Program Final EIS (DOE EIS /SA-156) - Upper Salmon River Anadromous Fish Passage Improvement Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, Carl J.

    2004-07-13

    BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less

  18. 30 CFR 285.623-285.625 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Construction and Operations Plan for Commercial Leases §§ 285.623-285.625 [Reserved] Contents of the Construction and Operations Plan ...

  19. 20. Photographic copy of an asconstructed site plan for additions ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photographic copy of an as-constructed site plan for additions to North Base: Job No. A(8-1), Military Construction, Materiel Command Flight Test Base, Muroc, California; Additional Construction, Location Plan, Sheet No. 2, October 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  20. Pascagoula Harbor, Mississippi. Feasibility Report on Improvement of the Federal Deep-Draft Navigation Channel. Volume 2. Technical Appendices. Revision.

    DTIC Science & Technology

    1985-03-01

    about half the time as the pipeline work, it would be logical for that work to begin about the middle of the period so all construction would finish ...d co)uld 𔃾’ -I to -rilch a plan i t c t C , . vy -;i- .: i m ’i, end o Iit coton . -p m -w 1u d ’if n;i ii 1 1in, ne, f e eco an .. i gil im 7" i

  1. Family planning and maternal and child health services.

    PubMed

    Singh, A

    1975-12-01

    Considerable effort has been made in the area of family planning in the State of Punjab. Family planning personnel has been recruited and trained at the State Family Planning Training and Research Center in Kharar; supplies of Nirodh, IUDs, oral contraceptives, and hospital equipment along with transportation facilities have been made available; and there has been some building construction. The State Health Education Bureau has worked to produce publicity material and has also used the mass media to create awareness of family planning among the people. As many as 120 rural and 49 urban Family Welfare Planning Centers are providing family planning services along with 856 subcenters in rural areas. 1123 other institutions are also doing family planning work in addition to the efforts of 34 mobile sterilization and IUD units attached to the District Family Planning Bureau and the contributions of some voluntary organizations. Although the state has adopted the cafeteria approach to family planning and the focus is on provision of family planning services on routine days in the various institutions to well-motivated couples, mass family planning camps for vasectomy, tubal ligations, and IUD insertions have been held with considerable success. Additionally, the State has integrated family planning programs with maternal and child health care in order to provide a totality of service. This precedes the total integration of this national program w ith general health services. Punjab has done well in achieving its targets for 1974-1975. Sterilization targets were set at 38,300 and 36,460 sterilizations, 95.2% of the target, were performed. IUD targets were 27,000, and the number achieved was 39,637 or 109.4%. The conventional contraceptive user target was 99,800, and 151,976 or 152.3% of the target figure became conventional contraceptive users.

  2. Investigation on factors that contribute to the abandonment of building in construction industry in Malaysia

    NASA Astrophysics Data System (ADS)

    Farhayu Ariffin, Nur; Jaafar, Mohd Faizal Md; Idris Ali, Mohamad; Irwan Ramli, Noram; Muthusamy, Khairunisa; Shukor Lim, Nor Hasanah Abdul

    2018-03-01

    In Malaysia, the construction sector is one of the important sectors that contribute to economic growth and employments. However, a major concern facing the construction industry is the growing rate of delays in project delivery. In the worse cases, the projects were abandoned due to some reasons when the contract period ended. Abandoned building defines as construction work that has been continuously stalled for 6 months or more, during the project completion period or beyond the scheduled date of completion. When the projects become abandoned, it gives an adverse effect on many parties such as the developer, contractor, consultant and also client. According to previous researchers, the abandonment of building causes a serious problem and need some mitigation plan to avoid this problem from occurring. This study will investigate the fundamental factors that contribute to the abandonment of building and projects in Malaysia based on the current data of the abandoned building in most states in Malaysia. The data was collected from the respondents who is in the construction industry and had experience working with abandoned housing project. Form the respondents perspective, it shows that the main factor contribute to the building abandonment is due to the financial problem facing by the developer company.

  3. Re-Writing the Construction History of Boughton House (northamptonshire, Uk) with the Help of DOCU-TOOLS®

    NASA Astrophysics Data System (ADS)

    Schuster, J. C.

    2017-08-01

    The tablet-based software docu-tools digitize the documentation of buildings, simplifies construction and facility management and the data analysis in building and construction-history research. As a plan-based software, `pins' can be set to record data (images, audio, text etc.), each data point containing a time and date stamp. Once a pin is set and information recorded, it can never be deleted from the system, creating clear contentious-free documentation. Reports to any/all data recorded can immediately be generated through various templates in order to share, document, analyze and archive the information gathered. The software both digitizes building condition assessment, as well as simplifies the fully documented management and solving of problems and monitoring of a building. Used both in the construction industry and for documenting and analyzing historic buildings, docu-tools is a versatile and flexible tool that has become integral to my work as a building historian working on the conservation and curating of the historic built environment in Europe. I used the software at Boughton House, Northamptonshire, UK, during a one-year research project into the construction history of the building. The details of how docu-tools was used during this project will be discussed in this paper.

  4. Guidelines for designing a digestive disease endoscopy unit: report of the World Endoscopy Organization.

    PubMed

    Mulder, Chris J J; Jacobs, Maarten A J M; Leicester, Roger J; Nageshwar Reddy, D; Shepherd, Libby E A; Axon, Anthony T; Waye, Jerome D

    2013-07-01

    A dedicated digestive disease endoscopy unit is structurally and functionally differentiating rapidly as a result of increasing diagnostic and therapeutic possibilities in the last 10-20 years. Publications with practical details are scarce, imposing a challenge in the construction of such a unit. The lack of authoritative information about endoscopy unit design means that architects produce their own design with or without consulting endoscopists working in such a unit. A working group of the World Endoscopy Organization discussed and outlined a practical approach fordesign and construction of a modern endoscopy unit. Designing the layout is extremely important, necessitating thoughtful planning to provide comfort to the endoscopy staff and patients, and efficient data archiving and transmission during endoscopic services. © 2013 The Authors. Digestive Endoscopy © 2013 Japan Gastroenterological Endoscopy Society.

  5. Architectural Drafting, Drafting 2: 9255.04.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course covers the basic fundamentals of architectural drafting and is not intended to delve into the more advanced phases of architecture. The student is presented with standards and procedures, and will become proficient in layout of floor plans, electrical plans, roof construction, foundation plans, typical wall construction, plot plans, and…

  6. Aligning everyday life priorities with people's self-management support networks: an exploration of the work and implementation of a needs-led telephone support system.

    PubMed

    Blickem, Christian; Kennedy, Anne; Jariwala, Praksha; Morris, Rebecca; Bowen, Robert; Vassilev, Ivaylo; Brooks, Helen; Blakeman, Tom; Rogers, Anne

    2014-06-17

    Recent initiatives to target the personal, social and clinical needs of people with long-term health conditions have had limited impact within primary care. Evidence of the importance of social networks to support people with long-term conditions points to the need for self-management approaches which align personal circumstances with valued activities. The Patient-Led Assessment for Network Support (PLANS) intervention is a needs-led assessment for patients to prioritise their health and social needs and provide access to local community services and activities. Exploring the work and practices of patients and telephone workers are important for understanding and evaluating the workability and implementation of new interventions. Qualitative methods (interviews, focus group, observations) were used to explore the experience of PLANS from the perspectives of participants and the telephone support workers who delivered it (as part of an RCT) and the reasons why the intervention worked or not. Normalisation Process Theory (NPT) was used as a sensitising tool to evaluate: the relevance of PLANS to patients (coherence); the processes of engagement (cognitive participation); the work done for PLANS to happen (collective action); the perceived benefits and costs of PLANS (reflexive monitoring). 20 patients in the intervention arm of a clinical trial were interviewed and their telephone support calls were recorded and a focus group with 3 telephone support workers was conducted. Analysis of the interviews, support calls and focus group identified three themes in relation to the delivery and experience of PLANS. These are: formulation of 'health' in the context of everyday life; trajectories and tipping points: disrupting everyday routines; precarious trust in networks. The relevance of these themes are considered using NPT constructs in terms of the work that is entailed in engaging with PLANS, taking action, and who is implicated this process. PLANS gives scope to align long-term condition management to everyday life priorities and valued aspects of life. This approach can improve engagement with health-relevant practices by situating them within everyday contexts. This has potential to increase utilisation of local resources with potential cost-saving benefits for the NHS. ISRCTN45433299.

  7. Nanotechnology-Enabled Optical Molecular Imaging of Breast Cancer

    DTIC Science & Technology

    2008-07-01

    explanation of results. 37 KEY RESEACH ACCOMPLISHMENTS • Design of needle-based fiber optic imaging system completed and development of first...policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting...our results to date. As described in the Statement of Work, Year 1 plans focused on design of this system and beginning initial construction. It

  8. Robotics Laboratory to Enhance the STEM Research Experience

    DTIC Science & Technology

    2015-04-30

    the Chemistry Program has a student working on the design and development of a Stirling Engine , which the student is planning to construct using...scale): Number of graduating undergraduates funded by a DoD funded Center of Excellence grant for Education, Research and Engineering : The number of... engineering or technology fields: Student Metrics This section only applies to graduating undergraduates supported by this agreement in this reporting

  9. 58. Photographic copy of original construction plan (St. Paul Engineer's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  10. MDOT implementation plan for GPS technology in planning, design, and construction delivery

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  11. Standard road plans index sheets [English version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed to show standardized design features, construction methods and approved materials to be used in design plans for Interstate, Primary, and Secondary road construction in the Stat...

  12. Standard road plans index sheets [metric version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed to show standardized design features, construction methods and approved materials to be used in design plans for Interstate, Primary, and Secondary road construction in the Stat...

  13. Adoption of Building Information Modelling in project planning risk management

    NASA Astrophysics Data System (ADS)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  14. Investigation and identification of factors affecting migrating peasant workers' usage of safety footwear in the Chinese construction industry.

    PubMed

    Suo, Qinghui; Zhang, Daming

    2017-09-01

    A sample of 300 migrating peasant workers from 15 Chinese building construction sites completed a demographic questionnaire to investigate the usage of safety footwear. The survey form was constructed based on the theory of planned behaviour, and a total of 12 questions focusing on the workers' past experience, attitudes, subjective norms and perceived behavioural control were included in the survey. It was found that 92% of the participants did not wear safety footwear while working on construction sites, although more than 91% of them believed that safety footwear would protect the foot from injury; none of the participants had been provided free safety footwear by their employer. Regression analysis shows that employers' attitude is the most important factor affecting their usage of safety footwear, 'providing free safety footwear' and 'comfortability of the safety footwear' ranking second and third respectively.

  15. 15th Annual School Construction Report, 2010

    ERIC Educational Resources Information Center

    Abramson, Paul

    2010-01-01

    School construction in 2009 fell 16 percent from one year ago, to just $16.4 billion, the lowest annual total for school construction since 1998. Indications are that it will fall further this year. "School Planning & Management" received reports on school construction completed and underway during 2009 and planned to start in 2010…

  16. 40 CFR 49.152 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... trailers to house construction management or staff and contractor personnel. Commence construction means... materials, storing of equipment or setting up temporary trailers to house construction management or staff...: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...

  17. 7 CFR 1924.1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Construction and Other Development § 1924.1 Purpose. This... 103-354 policies, methods, and responsibilities in the planning and performing of construction and...

  18. Compressed Air Working in Chennai During Metro Tunnel Construction: Occupational Health Problems.

    PubMed

    Kulkarni, Ajit C

    2017-01-01

    Chennai metropolis has been growing rapidly. Need was felt of a metro rail system. Two corridors were planned. Corridor 1, of 23 km starting from Washermanpet to Airport. 14.3 km of this would be underground. Corridor 2, of 22 km starting from Chennai Central Railway station to St. Thomas Mount. 9.7 km of this would be underground. Occupational health centre's role involved selection of miners and assessing their fitness to work under compressed air. Planning and execution of compression and decompression, health monitoring and treatment of compression related illnesses. More than thirty five thousand man hours of work was carried out under compressed air pressure ranged from 1.2 to 1.9 bar absolute. There were only three cases of pain only ( Type I) decompression sickness which were treated with recompression. Vigilant medical supervision, experienced lock operators and reduced working hours under pressure because of inclement environmental conditions viz. high temperature and humidity, has helped achieve this low incident. Tunnelling activity will increase in India as more cities will soon opt for underground metro railway. Indian standard IS 4138 - 1977 " Safety code for working in compressed air" needs to be updated urgently keeping pace with modern working methods.

  19. A multilayer perceptron solution to the match phase problem in rule-based artificial intelligence systems

    NASA Technical Reports Server (NTRS)

    Sartori, Michael A.; Passino, Kevin M.; Antsaklis, Panos J.

    1992-01-01

    In rule-based AI planning, expert, and learning systems, it is often the case that the left-hand-sides of the rules must be repeatedly compared to the contents of some 'working memory'. The traditional approach to solve such a 'match phase problem' for production systems is to use the Rete Match Algorithm. Here, a new technique using a multilayer perceptron, a particular artificial neural network model, is presented to solve the match phase problem for rule-based AI systems. A syntax for premise formulas (i.e., the left-hand-sides of the rules) is defined, and working memory is specified. From this, it is shown how to construct a multilayer perceptron that finds all of the rules which can be executed for the current situation in working memory. The complexity of the constructed multilayer perceptron is derived in terms of the maximum number of nodes and the required number of layers. A method for reducing the number of layers to at most three is also presented.

  20. An evaluation of Mexican transportation planning, finance, implementation, and construction processes.

    DOT National Transportation Integrated Search

    2009-10-01

    This research examined the legal, financial, institutional and policy processes that Mexico uses to plan, finance, : construct, and implement its transportation network. It documents through twelve case studies the state of the : practice in planning...

  1. 90. Photographic copy of plan of bins, section of boot, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    90. Photographic copy of plan of bins, section of boot, and photograph of construction originally published in Plans of Grain Elevators (Chicago; Grain Dealers Journal, 1918), p.53. PLAN OF BINS; SECTION OF BOOT; VIEW OF CONSTRUCTION LOOKING NORTHWEST - Northwestern Consolidated Elevator "A", 119 Fifth Avenue South, Minneapolis, Hennepin County, MN

  2. 46 CFR 71.20-10 - Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Plans. 71.20-10 Section 71.20-10 Shipping COAST GUARD... § 71.20-10 Plans. (a) Before application for inspection is made and before construction is started, the owner or builder shall have plans indicating the proposed arrangement and construction of the vessel...

  3. 29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...

  4. 29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...

  5. 29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...

  6. [Construction of the work process of the Family Health Support Nucleus: the experience of pharmacists in a city in the south of Brazil].

    PubMed

    Nakamura, Carina Akemi; Leite, Silvana Nair

    2016-05-01

    The Family Health Support Nucleus (NASF) was created in 2008 with the objective of broadening the range and scope of primary healthcare. The insertion of pharmacists in this multi-professional context represents an opportunity to enhance the working process and the rational access and use of medicines. The working processes of pharmacists in a city NASF was investigated. Field research was conducted using a qualitative approach with participant observation and semi-structured interviews. Two analytic dialectic categories emerged. The first was the pharmacists' dilemma in the construction of their working process as promoters of primary healthcare, while at the same time facing the need to deal with managerial functions mostly to cater to operational demand. The second was the reality experienced with guidelines and coordination of their work, where pharmacists can be free to structure their work as supporters, although at the same time it limits them due to lack of acknowledgment of their previously established working process. The lack of planning and a clear objective for work in the NASF, besides the deficiency of pharmaceutical services in primary healthcare make the development of any type of pharmacist activity important and essential even if it does not fully attend the NASF proposal.

  7. Perimeter security for Minnesota correctional facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crist, D.; Spencer, D.D.

    1996-12-31

    For the past few years, the Minnesota Department of Corrections, assisted by Sandia National Laboratories, has developed a set of standards for perimeter security at medium, close, and maximum custody correctional facilities in the state. During this process, the threat to perimeter security was examined and concepts about correctional perimeter security were developed. This presentation and paper will review the outcomes of this effort, some of the lessons learned, and the concepts developed during this process and in the course of working with architects, engineers and construction firms as the state upgraded perimeter security at some facilities and planned newmore » construction at other facilities.« less

  8. Reilly working on ISS construction during STS-117 EVA1

    NASA Image and Video Library

    2007-06-12

    ISS015-E-11870 (11 June 2007) --- Astronauts Jim Reilly and John "Danny" Olivas (visible among Reilly's helmet reflections), both STS-117 mission specialists, participate in the mission's first planned session of extravehicular activity (EVA), as construction resumes on the International Space Station. Among other tasks, Reilly and Olivas connected power, data and cooling cables between S1 and S3; released the launch restraints from and deployed the four solar array blanket boxes on S4 and released the cinches and winches holding the photovoltaic radiator on S4. The crew cabin and nose of Space Shuttle Atlantis docked to the station is visible in the background.

  9. Hierarchical Control and Trajectory Planning

    NASA Technical Reports Server (NTRS)

    Martin, Clyde F.; Horn, P. W.

    1994-01-01

    Most of the time on this project was spent on the trajectory planning problem. The construction is equivalent to the classical spline construction in the case that the system matrix is nilpotent. If the dimension of the system is n then the spline of degree 2n-1 is constructed. This gives a new approach to the construction of splines that is more efficient than the usual construction and at the same time allows the construction of a much larger class of splines. All known classes of splines are reconstructed using the approach of linear control theory. As a numerical analysis tool control theory gives a very good tool for constructing splines. However, for the purposes of trajectory planning it is quite another story. Enclosed in this document are four reports done under this grant.

  10. Eleventh Annual Report of Accomplishments Under the Airport Improvement Program

    DTIC Science & Technology

    1992-01-01

    552,860 INSTALL SECURITY SYSTEM PORTLAND INTERNATIONAL JETPORT (PRIMARY) 25 $255, 195 CONSTRUCT ACCESS ROAD PRESQUE ISLE 09 $988,548 CONSTRUCT AIRCRAFT...TAXIWAYS; INSTALL VISUAL APPROACH AIDS PENNSYLVANIA COMMONWEALTH OF PENNSYLVANIA S7 $89,050 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) DELAWARE...VALLEY REGION RA $195,030 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) SOUTHWESTERN PENNSYLVANIA REGION RA $310,950 CONDUCT REGIONAL SYSTEM PLAN

  11. MDOT implementation plan for global positioning systems (GPS) technology in planning, design, and construction delivery.

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  12. Quality planning in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  13. 3. "TEST STAND NO. 13, EXCAVATION PLAN & SECTIONS." Specifications ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. "TEST STAND NO. 1-3, EXCAVATION PLAN & SECTIONS." Specifications No. ENG 04-353-50-10; Drawing No. 60-0906; no sheet number within title block; D.O. SERIES 1109/10. Stamped: AS BUILT. No revisions or revision dates. Last work date on this drawing "Checked by EAG, 1/31/49." Though this drawing is specific to Test Stand 1-3, it also illustrates the general methods used for excavation design and retaining wall construction at Test Stand 1-5. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-3, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  14. Satellite Power Systems (SPS) concept definition study (exhibit C)

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1978-01-01

    A coplanar satellite conceptual approach was defined. This effort included several trade studies related to satellite design and also construction approaches for this satellite. A transportation system, consistent with this concept, was also studied, including an electric orbit transfer vehicle and a parallel-burn heavy lift launch vehicle. Work on a solid state microwave concept continued and several alternative approaches were evaluated. Computer determination of an optimized transistor and circuit design was also continued. Experiment/verification planning resulted in the development of a total solar array and microwave technology development plan, as well as definition of near-term research to evaluate key technology issues.

  15. An honest day's work: pay for performance in a pediatric radiology department.

    PubMed

    Bisset, George S

    2017-06-01

    Compensation models in radiology take a variety of forms, but regardless of practice type, successful models must reward productivity, be simple, and epitomize fairness. The ideal model should also be flexible enough to transition, based upon the changing strategic goals of a department. The plan should be constructed around rewarding the behaviors that the organization values. In this minisymposium article the author presents the value of different types of compensation plans and discusses advantages and disadvantages. Finally, the author presents a pay-for-performance model that has had long-term success at a private-turned-academic practice in pediatric radiology.

  16. Gaussian-based filters for detecting Martian dust devils

    USGS Publications Warehouse

    Yang, F.; Mlsna, P.A.; Geissler, P.

    2006-01-01

    The ability to automatically detect dust devils in the Martian atmosphere from orbital imagery is becoming important both for scientific studies of the planet and for the planning of future robotic and manned missions. This paper describes our approach for the unsupervised detection of dust devils and the preliminary results achieved to date. The algorithm centers upon the use of a filter constructed from Gaussian profiles to match dust devil characteristics over a range of scale and orientation. The classification step is designed to reduce false positive errors caused by static surface features such as craters. A brief discussion of planned future work is included. ?? 2006 IEEE.

  17. Phase-Division-Based Dynamic Optimization of Linkages for Drawing Servo Presses

    NASA Astrophysics Data System (ADS)

    Zhang, Zhi-Gang; Wang, Li-Ping; Cao, Yan-Ke

    2017-11-01

    Existing linkage-optimization methods are designed for mechanical presses; few can be directly used for servo presses, so development of the servo press is limited. Based on the complementarity of linkage optimization and motion planning, a phase-division-based linkage-optimization model for a drawing servo press is established. Considering the motion-planning principles of a drawing servo press, and taking account of work rating and efficiency, the constraints of the optimization model are constructed. Linkage is optimized in two modes: use of either constant eccentric speed or constant slide speed in the work segments. The performances of optimized linkages are compared with those of a mature linkage SL4-2000A, which is optimized by a traditional method. The results show that the work rating of a drawing servo press equipped with linkages optimized by this new method improved and the root-mean-square torque of the servo motors is reduced by more than 10%. This research provides a promising method for designing energy-saving drawing servo presses with high work ratings.

  18. 5. Photographic copy of construction drawing, dated December 13, 1933, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of construction drawing, dated December 13, 1933, Construction Service QMC, Office of the Constructing Quartermaster, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ELEVATIONS AND PLAN, PLAN NO. 6658-1, DRAWING 6658-1, DRAWING 6658-242. - Selfridge Field, Building No. 156, Railroad Avenue at North Jefferson Avenue, Mount Clemens, Macomb County, MI

  19. 29 CFR 4211.3 - Special rules for construction industry and IRC section 404(c) plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Special rules for construction industry and IRC section 404... WITHDRAWING EMPLOYERS General § 4211.3 Special rules for construction industry and IRC section 404(c) plans... covers employees in the building and construction industry shall use the presumptive method for...

  20. 29 CFR 4211.3 - Special rules for construction industry and IRC section 404(c) plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Special rules for construction industry and IRC section 404... WITHDRAWING EMPLOYERS General § 4211.3 Special rules for construction industry and IRC section 404(c) plans... covers employees in the building and construction industry shall use the presumptive method for...

  1. 29 CFR 4211.3 - Special rules for construction industry and IRC section 404(c) plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Special rules for construction industry and IRC section 404... WITHDRAWING EMPLOYERS General § 4211.3 Special rules for construction industry and IRC section 404(c) plans... covers employees in the building and construction industry shall use the presumptive method for...

  2. 29 CFR 4211.3 - Special rules for construction industry and IRC section 404(c) plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Special rules for construction industry and IRC section 404... WITHDRAWING EMPLOYERS General § 4211.3 Special rules for construction industry and IRC section 404(c) plans... covers employees in the building and construction industry shall use the presumptive method for...

  3. 29 CFR 4211.3 - Special rules for construction industry and IRC section 404(c) plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Special rules for construction industry and IRC section 404... WITHDRAWING EMPLOYERS General § 4211.3 Special rules for construction industry and IRC section 404(c) plans... covers employees in the building and construction industry shall use the presumptive method for...

  4. Task-level control for autonomous robots

    NASA Technical Reports Server (NTRS)

    Simmons, Reid

    1994-01-01

    Task-level control refers to the integration and coordination of planning, perception, and real-time control to achieve given high-level goals. Autonomous mobile robots need task-level control to effectively achieve complex tasks in uncertain, dynamic environments. This paper describes the Task Control Architecture (TCA), an implemented system that provides commonly needed constructs for task-level control. Facilities provided by TCA include distributed communication, task decomposition and sequencing, resource management, monitoring and exception handling. TCA supports a design methodology in which robot systems are developed incrementally, starting first with deliberative plans that work in nominal situations, and then layering them with reactive behaviors that monitor plan execution and handle exceptions. To further support this approach, design and analysis tools are under development to provide ways of graphically viewing the system and validating its behavior.

  5. Electron Density Calibration for Radiotherapy Treatment Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herrera-Martinez, F.; Rodriguez-Villafuerte, M.; Martinez-Davalos, A.

    2006-09-08

    Computed tomography (CT) images are used as basic input data for most modern radiosurgery treatment planning systems (TPS). CT data not only provide anatomic information to delineate target volumes, but also allow the introduction of corrections for tissue inhomogeneities into dose calculations during the treatment planning procedure. These corrections involve the determination of a relationship between tissue electron density ({rho}e) and their corresponding Hounsfield Units (HU). In this work, an elemental analysis of different commercial tissue equivalent materials using Scanning Electron Microscopy was carried out to characterize their chemical composition. The tissue equivalent materials were chosen to ensure a largemore » range of {rho}e to be included in the CT scanner calibration. A phantom was designed and constructed with these materials to simulate the size of a human head.« less

  6. 37. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER 800-142. MOBILIZATION BUILDINGS; ALTERNATE PLATFORM CONSTRUCTION; 25'-0' & 29'-6' WIDE BLDG. - TWO STORY; POSTS AND BEARING PARTITIONS; SECTIONS & DETAILS. - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  7. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  8. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  9. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  10. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  11. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  12. 48. Photographic copy of original construction plan (Wabasha St. Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. Photographic copy of original construction plan (Wabasha St. Bridge, Plan of Masonry for Abutment, Piers No. 1 and 3, 1888); North abutment, first and second piers - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  13. Predicting on-site environmental impacts of municipal engineering works

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu

    2014-01-15

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering projectmore » documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also help contractors to implement environmental management systems.« less

  14. Hybrid Electro-Optic Processor

    DTIC Science & Technology

    1991-07-01

    This report describes the design of a hybrid electro - optic processor to perform adaptive interference cancellation in radar systems. The processor is...modulator is reported. Included is this report is a discussion of the design, partial fabrication in the laboratory, and partial testing of the hybrid electro ... optic processor. A follow on effort is planned to complete the construction and testing of the processor. The work described in this report is the

  15. Silk Purse from a Sow's Ear? Why Knowledge Matters and Why the Draft History NC Will Not Improve It

    ERIC Educational Resources Information Center

    Hall, Katie; Counsell, Christine

    2013-01-01

    Katie Hall and Christine Counsell attempt to construct a Key Stage 3 scheme of work out of the draft National Curriculum for history that was released for consultation in England in February 2013. They explain the process by which they attempted to convert the programme of study into a coherent, workable plan that would fulfil the stated aims.…

  16. Swanson works on the P6 Truss during EVA 2

    NASA Image and Video Library

    2007-06-14

    S117-E-07332 (13 June 2007) --- Astronauts Steven Swanson and Patrick Forrester (out of frame), both STS-117 mission specialists, participate in the mission's second planned session of extravehicular activity (EVA), as construction resumes on the International Space Station. Among other tasks, Forrester and Swanson removed all of the launch locks holding the 10-foot-wide solar alpha rotary joint in place and began the solar array retraction.

  17. JPRS Report, East Europe.

    DTIC Science & Technology

    1990-12-17

    traditional markets is con- cerned. In the West resigning employees pledge them- selves in writing not to engage in a competing business for, say, a year...showing a great interest. Project plans are being worked out for large hotels, programs for what is called big business , for food production, as...generation of electric power for export, projects in agriculture and food and beverage produc- tion, the construction and modernization of trunk rail

  18. Handbook To Facilitate Faculty Awareness of Library Resources and Services: One Library's Initial Response to the College of Business Administration's Search for AACSB Accreditation.

    ERIC Educational Resources Information Center

    Earle, Katherine Weeks

    Created by the College of Business Administration (COBA) and the libraries of the University of Northern Colorado, this 1988-89 handbook was part of a strategic plan to achieve initial accreditation by the American Assembly of Collegiate Schools of Business (AACSB). Constructed by the reference librarian who works directly with COBA, the handbook…

  19. The STS-98 crew gathers for snack before launch

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- The STS-98 crew gathers around a table for a snack before getting ready for launch on Space Shuttle Atlantis. Seated left to right are Mission Specialist Thomas Jones, Pilot Mark Polansky, Commander Ken Cockrell and Mission Specialists Marsha Ivins and Robert Curbeam. STS-98 is the seventh construction flight to the International Space Station. Atlantis is carrying the U.S. Laboratory Destiny, a key module in the growth of the Space Station. Destiny will be attached to the Unity node on the Space Station using the Shuttle'''s robotic arm. Three spacewalks, by Curbeam and Jones, are required to complete the planned construction work during the 11-day mission. Launch is targeted for 6:11 p.m. EST and the planned landing at KSC Feb. 18 about 1:39 p.m. This mission marks the seventh Shuttle flight to the Space Station, the 23rd flight of Atlantis and the 102nd flight overall in NASA'''s Space Shuttle program.

  20. 50 CFR 85.30 - Grant selection criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... constructing and renovating pumpout and dump stations without an approved plan; (c) In coastal States, proposals for constructing and renovating pumpout and dump stations in accordance with a coastal State's... constructing and renovating pumpout and dump stations in accordance with an inland State's plan; (d) Proposals...

  1. Generalizable open source urban water portfolio simulation framework demonstrated using a multi-objective risk-based planning benchmark problem.

    NASA Astrophysics Data System (ADS)

    Trindade, B. C.; Reed, P. M.

    2017-12-01

    The growing access and reduced cost for computing power in recent years has promoted rapid development and application of multi-objective water supply portfolio planning. As this trend continues there is a pressing need for flexible risk-based simulation frameworks and improved algorithm benchmarking for emerging classes of water supply planning and management problems. This work contributes the Water Utilities Management and Planning (WUMP) model: a generalizable and open source simulation framework designed to capture how water utilities can minimize operational and financial risks by regionally coordinating planning and management choices, i.e. making more efficient and coordinated use of restrictions, water transfers and financial hedging combined with possible construction of new infrastructure. We introduce the WUMP simulation framework as part of a new multi-objective benchmark problem for planning and management of regionally integrated water utility companies. In this problem, a group of fictitious water utilities seek to balance the use of the mentioned reliability driven actions (e.g., restrictions, water transfers and infrastructure pathways) and their inherent financial risks. Several traits of this problem make it ideal for a benchmark problem, namely the presence of (1) strong non-linearities and discontinuities in the Pareto front caused by the step-wise nature of the decision making formulation and by the abrupt addition of storage through infrastructure construction, (2) noise due to the stochastic nature of the streamflows and water demands, and (3) non-separability resulting from the cooperative formulation of the problem, in which decisions made by stakeholder may substantially impact others. Both the open source WUMP simulation framework and its demonstration in a challenging benchmarking example hold value for promoting broader advances in urban water supply portfolio planning for regions confronting change.

  2. Remotely controlled sensor apparatus for use in dig-face characterization system

    DOEpatents

    Josten, N.E.; Svoboda, J.M.

    1999-05-25

    A remotely controlled sensor platform apparatus useful in a dig-face characterization system is deployed from a mobile delivery device such as standard heavy construction equipment. The sensor apparatus is designed to stabilize sensors against extraneous motions induced by heavy equipment manipulations or other outside influences, and includes a terrain sensing and sensor elevation control system to maintain the sensors in close ground proximity. The deployed sensor apparatus is particularly useful in collecting data in work environments where human access is difficult due to the presence of hazardous conditions, rough terrain, or other circumstances that prevent efficient data collection by conventional methods. Such work environments include hazardous waste sites, unexploded ordnance sites, or construction sites. Data collection in these environments by utilizing the deployed sensor apparatus is desirable in order to protect human health and safety, or to assist in planning daily operations to increase efficiency. 13 figs.

  3. Remotely controlled sensor apparatus for use in dig-face characterization system

    DOEpatents

    Josten, Nicholas E.; Svoboda, John M.

    1999-01-01

    A remotely controlled sensor platform apparatus useful in a dig-face characterization system is deployed from a mobile delivery device such as standard heavy construction equipment. The sensor apparatus is designed to stabilize sensors against extraneous motions induced by heavy equipment manipulations or other outside influences, and includes a terrain sensing and sensor elevation control system to maintain the sensors in close ground proximity. The deployed sensor apparatus is particularly useful in collecting data in work environments where human access is difficult due to the presence of hazardous conditions, rough terrain, or other circumstances that prevent efficient data collection by conventional methods. Such work environments include hazardous waste sites, unexploded ordnance sites, or construction sites. Data collection in these environments by utilizing the deployed sensor apparatus is desirable in order to protect human health and safety, or to assist in planning daily operations to increase efficiency.

  4. Risk Perception Analysis Related To Existing Dams In Italy

    NASA Astrophysics Data System (ADS)

    Solimene, Pellegrino

    2013-04-01

    In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned earthfill dam is illustrated by defining the risk analysis during its construction and operation. A qualitative "Event Tree Analysis" makes clear with an example the probability of occurrence of the events triggered by an earthquake, and leads to a classification of the damage level. Finally, a System Dynamics (SD) approach is presented to investigate possibilities of a preventive planning in relationship to the risk, so that it's possible to establish shared procedures to achieve the correct management in any crisis phase. As a qualitative result of a SD application, figure 1 presents a flow-chart about a case study on the same dam so to illustrate the emergency planning in a step by step procedure according to the Regulations.

  5. Development of an automated pre-sampling plan for construction projects : final report.

    DOT National Transportation Integrated Search

    1983-03-01

    The development of an automated pre-sampling plan was undertaken to free the district construction personnel from the cumbersome and time-consuming task of preparing such plans manually. A computer program was written and linked to a data file which ...

  6. 25 CFR 170.415 - What is pre-project planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range... sources and identification of other funding sources to expedite the planning, design, and construction of...

  7. A meta-analysis of self-regulated learning in work-related training and educational attainment: what we know and where we need to go.

    PubMed

    Sitzmann, Traci; Ely, Katherine

    2011-05-01

    Researchers have been applying their knowledge of goal-oriented behavior to the self-regulated learning domain for more than 30 years. This review examines the current state of research on self-regulated learning and gaps in the field's understanding of how adults regulate their learning of work-related knowledge and skills. Self-regulation theory was used as a conceptual lens for deriving a heuristic framework of 16 fundamental constructs that constitute self-regulated learning. Meta-analytic findings (k=430, N=90,380) support theoretical propositions that self-regulation constructs are interrelated-30% of the corrected correlations among constructs were .50 or greater. Goal level, persistence, effort, and self-efficacy were the self-regulation constructs with the strongest effects on learning. Together these constructs accounted for 17% of the variance in learning, after controlling for cognitive ability and pretraining knowledge. However, 4 self-regulatory processes-planning, monitoring, help seeking, and emotion control-did not exhibit significant relationships with learning. Thus, a parsimonious framework of the self-regulated learning domain is presented that focuses on a subset of self-regulatory processes that have both limited overlap with other core processes and meaningful effects on learning. Research is needed to advance the field's understanding of how adults regulate their learning in an increasingly complex and knowledge-centric work environment. Such investigations should capture the dynamic nature of self-regulated learning, address the role of self-regulation in informal learning, and investigate how trainees regulate their transfer of training. © 2011 American Psychological Association

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herk, A.; Poerschke, A.; Beach, R.

    In 2012-2013, IBACOS worked with a builder, Brookfield Homes in Denver, Colorado, to design and construct a Passive House certified model home. IBACOS used several modeling programs and calculation methods to complete the final design package along with Brookfield's architect KGA Studio. This design package included upgrades to the thermal enclosure, basement insulation, windows, and heating, ventilation, and air conditioning. Short-term performance testing in the Passive House was done during construction and after construction. Testing with a blower door indicated that whole-building air leakage to the outside was 324 CFM and 0.60 ACH50. The other two test homes had littlemore » short-term testing done post-construction by the local energy rater. IBACOS then monitored the energy consumption and whole-house comfort conditions of that occupied Passive House after one year of operation and compared the monitoring results to those for two other occupied test houses in the same area with similar square footage but slightly different floor plans. IBACOS also assisted the builder, Brookfield Homes, in researching design scenarios for Zero Energy Ready Home and ENERGY STAR acceptance levels. IBACOS also assisted Brookfield in conceptualizing product for Denver's Brighton Heights area. Brookfield was considering building to Zero Energy Ready Home standards in that location. IBACOS provided strategies that Brookfield may draw from in the event the builder chooses to pursue a Zero Energy Ready Home plan for that market.« less

  9. 7 CFR 4280.119 - Construction planning and performing development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...

  10. 7 CFR 4280.119 - Construction planning and performing development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...

  11. 7 CFR 4280.119 - Construction planning and performing development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...

  12. Ghosts in the machine: publication planning in the medical sciences.

    PubMed

    Sismondo, Sergio

    2009-04-01

    Publication of pharmaceutical company-sponsored research in medical journals, and its presentation at conferences and meetings, is mostly governed by 'publication plans' that extract the maximum amount of scientific and commercial value out of data and analyses through carefully constructed and placed papers. Clinical research is typically performed by contract research organizations, analyzed by company statisticians, written up by independent medical writers, approved and edited by academic researchers who then serve as authors, and the whole process organized and shepherded through to journal publication by publication planners. This paper reports on a conference of an international association of publication planners. It describes and analyzes their work in an ecological framework that relates it to marketing departments of pharmaceutical companies, medical journals and publishers, academic authors, and potential audiences. The medical research described here forms a new kind of corporate science, designed to look like traditional academic work, but performed largely to market products.

  13. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  14. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  15. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  16. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  17. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  18. An Inner Barrier to Career Development: Preconditions of the Impostor Phenomenon and Consequences for Career Development

    PubMed Central

    Neureiter, Mirjam; Traut-Mattausch, Eva

    2016-01-01

    The impostor phenomenon (IP) is increasingly recognized as an important psychological construct for career development, yet empirical research on how it functions in this domain is sparse. We investigated in what way impostor feelings are related to the fear of failure, fear of success, self-esteem, and the career-development aspects career planning, career striving, and the motivation to lead. We conducted two studies with independent samples of university students (N = 212) in a laboratory study and working professionals (N = 110) in an online study. In both samples, impostor feelings were fostered by fear of failure, fear of success, and low self-esteem and they decreased career planning, career striving, and the motivation to lead. A path analysis showed that impostor feelings had the most negative effects on career planning and career striving in students and on the motivation to lead in working professionals. The results suggest that the IP is relevant to career development in different ways at different career stages. Practical implications and interventions to reduce the negative effects of impostor feelings on career development are discussed. PMID:26869957

  19. An Inner Barrier to Career Development: Preconditions of the Impostor Phenomenon and Consequences for Career Development.

    PubMed

    Neureiter, Mirjam; Traut-Mattausch, Eva

    2016-01-01

    The impostor phenomenon (IP) is increasingly recognized as an important psychological construct for career development, yet empirical research on how it functions in this domain is sparse. We investigated in what way impostor feelings are related to the fear of failure, fear of success, self-esteem, and the career-development aspects career planning, career striving, and the motivation to lead. We conducted two studies with independent samples of university students (N = 212) in a laboratory study and working professionals (N = 110) in an online study. In both samples, impostor feelings were fostered by fear of failure, fear of success, and low self-esteem and they decreased career planning, career striving, and the motivation to lead. A path analysis showed that impostor feelings had the most negative effects on career planning and career striving in students and on the motivation to lead in working professionals. The results suggest that the IP is relevant to career development in different ways at different career stages. Practical implications and interventions to reduce the negative effects of impostor feelings on career development are discussed.

  20. New Whole-House Solutions Case Study: A Production Builder's Passive House - Denver, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Brookfield Home’s first project is in a community called Midtown in Denver, Colorado, in which the builder took on the challenge of increased energy efficiency by creating a Passive House (PH)-certified model home. Brookfield worked with the U.S. Department of Energy’s Building America research team IBACOS to create the home, evaluate advanced building technologies, and use the home as a marketing tool for potential homebuyers. Brookfield also worked with KGA studio architects to create a new floor plan that would be constructed to the PH standard as an upgrade option.

  1. 19. Photographic copy of an asconstructed site plan for additions ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographic copy of an as-constructed site plan for additions to North Base: Job No. Muroc A(511), Military Construction, Third District Region, San Bernardino, California; Muroc Bombing Range, Muroc Lake, Calif; Additional Temporary Construction, Materiel Center Flight Test Base, Location Grading & Paving Plan, Sheet No. 1 of 21, March 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  2. Anomalies and contradictions in an airport construction project: a historical analysis based on Cultural-Historical Activity Theory.

    PubMed

    Lopes, Manoela Gomes Reis; Vilela, Rodolfo Andrade de Gouveia; Querol, Marco Antônio Pereira

    2018-02-19

    Large construction projects involve the functioning of a complex activity system (AS) in network format. Anomalies such as accidents, delays, reworks, etc., can be explained by contradictions that emerge historically in the system. The aim of this study was to analyze the history of an airport construction project to understand the current contradictions and anomalies in the AS and how they emerged. A case study was conducted for this purpose, combining Collective Work Analysis, interviews, observations, and analysis of documents that provided the basis for sessions in the Change Laboratory, where a participant timeline was elaborated with the principal events during the construction project. Based on the timeline, a historical analysis of the airport's AS revealed critical historical events and contradictions that explained the anomalies that occurred during the project. The analysis showed that the airport had been planned for construction with politically determined deadlines that were insufficient and inconsistent with the project's complexity. The choice of the contract modality, which assigned responsibility to a joint venture for all of the project's phases, was another critical historical event, because it allowed launching the construction before a definitive executive project had been drafted. There were also different cultures in companies working together for the first time in the context of a project with time pressures and outsourcing of activities without the necessary coordination. Identifying these contradictions and their historical origins proved essential for understanding the current situation and efforts to prevent similar situations in the future.

  3. 8. Photographic copy of construction drawing, dated November 10, 1932, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of construction drawing, dated November 10, 1932, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLANS, ELEVATIONS, DETAILS, PLAN NO. 635-100. - Selfridge Field, Building No. 129, Wilbur Wright Boulevard at Ash Street, Mount Clemens, Macomb County, MI

  4. 40 CFR 60.1050 - Who must submit a materials separation plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which... separation plan for your municipal waste combustion unit if you commence construction of a new small municipal waste combustion unit after December 6, 2000. (b) If you commence construction of your municipal...

  5. 40 CFR 60.1050 - Who must submit a materials separation plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which... separation plan for your municipal waste combustion unit if you commence construction of a new small municipal waste combustion unit after December 6, 2000. (b) If you commence construction of your municipal...

  6. 46 CFR 110.25-1 - Plans and information required for new construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction... available at the point of application. (b) Electrical plant load analysis including connected loads and...

  7. 46 CFR 110.25-1 - Plans and information required for new construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction... available at the point of application. (b) Electrical plant load analysis including connected loads and...

  8. 46 CFR 160.035-14 - Procedure for approval of lifeboats.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., plans covering fully the arrangement and construction of the lifeboat, material specifications, together... the Commandant through the Commander of the Coast Guard District in which the lifeboat is built. The plans for approval must be detailed to a degree that the lifeboat can be constructed from the plans...

  9. 46 CFR 160.035-14 - Procedure for approval of lifeboats.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., plans covering fully the arrangement and construction of the lifeboat, material specifications, together... the Commandant through the Commander of the Coast Guard District in which the lifeboat is built. The plans for approval must be detailed to a degree that the lifeboat can be constructed from the plans...

  10. 46. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities planning Office, Iowa State University, Ames, Iowa. SECOND FLOOR PLAN, ROOF PLANS, AND ROOF DETAILS; SHEET NO. 4 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  11. Towards a better reliability of risk assessment: development of a qualitative & quantitative risk evaluation model (Q2REM) for different trades of construction works in Hong Kong.

    PubMed

    Fung, Ivan W H; Lo, Tommy Y; Tung, Karen C F

    2012-09-01

    Since the safety professionals are the key decision makers dealing with project safety and risk assessment in the construction industry, their perceptions of safety risk would directly affect the reliability of risk assessment. The safety professionals generally tend to heavily rely on their own past experiences to make subjective decisions on risk assessment without systematic decision making. Indeed, understanding of the underlying principles of risk assessment is significant. In this study, the qualitative analysis on the safety professionals' beliefs of risk assessment and their perceptions towards risk assessment, including their recognitions of possible accident causes, the degree of differentiations on their perceptions of risk levels of different trades of works, recognitions of the occurrence of different types of accidents, and their inter-relationships with safety performance in terms of accident rates will be explored in the Stage 1. At the second stage, the deficiencies of the current general practice for risk assessment can be sorted out firstly. Based on the findings from Stage 1 and the historical accident data from 15 large-scaled construction projects in 3-year average, a risk evaluation model prioritizing the risk levels of different trades of works and which cause different types of site accident due to various accident causes will be developed quantitatively. With the suggested systematic accident recording techniques, this model can be implemented in the construction industry at both project level and organizational level. The model (Q(2)REM) not only act as a useful supplementary guideline of risk assessment for the construction safety professionals, but also assists them to pinpoint the potential risks on site for the construction workers under respective trades of works through safety trainings and education. It, in turn, arouses their awareness on safety risk. As the Q(2)REM can clearly show the potential accident causes leading to different types of accident by trade of works, it helps the concerned safety professionals and parties to plan effective accident prevention measures with reference to the priority of the risk levels. Copyright © 2011 Elsevier Ltd. All rights reserved.

  12. Evolution of high-rise construction in Leningrad - Saint Petersburg in the middle of the 20th - Early 21st centuries: projects and Implementation

    NASA Astrophysics Data System (ADS)

    Vaytens, Andrey; Rusanov, Gennadiy; Skryabin, Pavel

    2018-03-01

    One of the most important issues in national urban planning is arrangement of high-rise buildings in the largest cities of Russia. This issue becomes especially acute in such cities as Saint Petersburg, which has unique architectural and urban-planning heritage preserved to a great extent. In this regard, it seems important to trace the evolution of high-rise construction development and arrangement in Leningrad - Saint Petersburg in the middle of the 20th — early 21st centuries. The goal of the article is to consider high-rise construction development regarding both public and residential buildings in comparison of project ideas and results of their implementation in the 1940s-2000s. Prerequisites and issues of high-rise construction of that period are considered. Particular attention is paid to changes in the official urban-planning policy, regulatory framework and attitude of city authorities to high-rise construction. The study was carried out with the consideration of the following historic periods differing in their urban-planning policy: the late 1940s-1950s; 1960s; 1970-1980s; 1990s; 2000s-2010s. Economical prerequisites of high-rise construction and their influence on the modern urban-planning policy during the post-Soviet period are considered. In conclusion, an attempt is made to determine tendencies of high-rise construction development in Saint Petersburg.

  13. Progress on the Construction of the Perpendicularly Biased 2nd Harmonic Cavity for the Fermilab Booster

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Madrak, R.; Dey, J.; Duel, K.

    A perpendicularly biased tuneable 2nd harmonic cavity, designed for the Fermilab Booster, is being assembled for testing this summer (2018). The cavity will work at twice the frequency of the fundamental cavities, and will be on only during the injection and transition (or extraction) periods. The main reason for adding this cavity is to improve beam capture and reduce losses as required by Fermilab's Proton Improvement Plan (PIP). After three years optimization and study, the cavity design has now been finalized and all constituent parts have been received. We report on the cavity final design and on the status ofmore » the construction.« less

  14. Dust Exposure and Coccidioidomycosis Prevention Among Solar Power Farm Construction Workers in California.

    PubMed

    Sondermeyer Cooksey, Gail L; Wilken, Jason A; McNary, Jennifer; Gilliss, Debra; Shusterman, Dennis; Materna, Barbara L; Vugia, Duc J

    2017-08-01

    To investigate if work activities, dust exposure, and protection measures were associated with a 2011 to 2014 coccidioidomycosis outbreak among workers constructing 2 solar farms in California. In 2013, we mailed self-administered questionnaires to employees who were onsite at the solar farms where the outbreak occurred to identify cases of clinical coccidioidomycosis and compare with asymptomatic workers by using multivariate logistic regression. When we compared 89 workers with clinical coccidioidomycosis to 325 asymptomatic workers, frequently being in a dust cloud or storm (odds ratio [OR] = 5.93; 95% confidence interval [CI] = 3.18, 11.06) significantly increased the odds of clinical coccidioidomycosis, whereas frequently wetting soil before soil-disturbing activity (OR = 0.42; 95% CI = 0.24, 0.75) was protective. When we controlled for being in a dust cloud or storm, frequent soil disturbance significantly increased the odds of clinical coccidioidomycosis only among those who reported wearing a respirator infrequently (OR = 2.31; 95% CI = 1.27, 4.21). Utilization of personal and employer-driven safety practices and increased coccidioidomycosis awareness among construction workers should be considered during the planning of any construction work in coccidioidomycosis-endemic regions to prevent occupational infections and outbreaks.

  15. A Study of Facilities and Infrastructure Planning, Prioritization, and Assessment at Federal Security Laboratories (Revised)

    DTIC Science & Technology

    2013-02-01

    or funds authorized under Section 219(a) for projects costing no more than $4M. Research , Development, Test , and Evaluation (RDT&E) Appropriations...The RDT&E appropriation consists of the mission program budgets for all research , development, test and evaluation work performed by contractors...carry out an unspecified minor military construction project costing not more than $4,000,000. 9 f. Research , Development, Test , and Evaluation

  16. National Security Reform 2010: A Mid-Term Assessment

    DTIC Science & Technology

    2011-08-01

    5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) U.S. Army War College,Strategic...Minuteman Me- morial Building in Washington, DC. In addition, our Bush School staff performed nu- merous tasks in planning and executing the confer...more clearly. Carafano conclud- ed by stating that the government should build an ef- fective construct for the whole of government, and the nation’s

  17. Communities’ Strategic Opportunities Through Broken Window Repair and Global Commons Improvements

    DTIC Science & Technology

    2014-06-01

    5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Program Executive Office (Integrated...Warfare Systems),16107 Benedict Court,Woodbridge,VA,22191-4302 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND...identified six priorities, areas of focus: continue to focus on institutional reform; re-evaluate our military’s force planning construct ; preparing for a

  18. Forrester works at the P6 Truss during EVA 2 on STS-117 Mission

    NASA Image and Video Library

    2007-06-14

    S117-E-07313 (13 June 2007) --- Astronauts Patrick Forrester and Steven Swanson (out of frame), both STS-117 mission specialists, participate in the mission's second planned session of extravehicular activity (EVA), as construction resumes on the International Space Station. Among other tasks, Forrester and Swanson removed all of the launch locks holding the 10-foot-wide solar alpha rotary joint in place and began the solar array retraction.

  19. Forrester works at the P6 Truss during EVA 2 on STS-117 Mission

    NASA Image and Video Library

    2007-06-14

    S117-E-07315 (13 June 2007) --- Astronauts Patrick Forrester and Steven Swanson (out of frame), both STS-117 mission specialists, participate in the mission's second planned session of extravehicular activity (EVA), as construction resumes on the International Space Station. Among other tasks, Forrester and Swanson removed all of the launch locks holding the 10-foot-wide solar alpha rotary joint in place and began the solar array retraction.

  20. JPRS Report, China, Qiushi Seeking Truth, No. 23, 1 December 1990.

    DTIC Science & Technology

    1991-02-08

    doubt that we that the building of spiritual civilization-including the must persist in taking economic construction as the building of ideology and...development of a planned commodity economy, to areas of economic , political, cultural, and social lives, provide better material conditions and a broader...prob- who "have ideals, morality, culture, and discipline." We lems. Our country has built an economic system which must do work in this respect

  1. Case Study on Project Risk Management Planning Based on Soft System Methodology

    NASA Astrophysics Data System (ADS)

    Lifang, Xie; Jun, Li

    This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.

  2. Aligning everyday life priorities with people’s self-management support networks: an exploration of the work and implementation of a needs-led telephone support system

    PubMed Central

    2014-01-01

    Background Recent initiatives to target the personal, social and clinical needs of people with long-term health conditions have had limited impact within primary care. Evidence of the importance of social networks to support people with long-term conditions points to the need for self-management approaches which align personal circumstances with valued activities. The Patient-Led Assessment for Network Support (PLANS) intervention is a needs-led assessment for patients to prioritise their health and social needs and provide access to local community services and activities. Exploring the work and practices of patients and telephone workers are important for understanding and evaluating the workability and implementation of new interventions. Methods Qualitative methods (interviews, focus group, observations) were used to explore the experience of PLANS from the perspectives of participants and the telephone support workers who delivered it (as part of an RCT) and the reasons why the intervention worked or not. Normalisation Process Theory (NPT) was used as a sensitising tool to evaluate: the relevance of PLANS to patients (coherence); the processes of engagement (cognitive participation); the work done for PLANS to happen (collective action); the perceived benefits and costs of PLANS (reflexive monitoring). 20 patients in the intervention arm of a clinical trial were interviewed and their telephone support calls were recorded and a focus group with 3 telephone support workers was conducted. Results Analysis of the interviews, support calls and focus group identified three themes in relation to the delivery and experience of PLANS. These are: formulation of ‘health’ in the context of everyday life; trajectories and tipping points: disrupting everyday routines; precarious trust in networks. The relevance of these themes are considered using NPT constructs in terms of the work that is entailed in engaging with PLANS, taking action, and who is implicated this process. Conclusions PLANS gives scope to align long-term condition management to everyday life priorities and valued aspects of life. This approach can improve engagement with health-relevant practices by situating them within everyday contexts. This has potential to increase utilisation of local resources with potential cost-saving benefits for the NHS. Trial registration ISRCTN45433299. PMID:24938492

  3. Compressed Air Working in Chennai During Metro Tunnel Construction: Occupational Health Problems

    PubMed Central

    Kulkarni, Ajit C.

    2017-01-01

    Chennai metropolis has been growing rapidly. Need was felt of a metro rail system. Two corridors were planned. Corridor 1, of 23 km starting from Washermanpet to Airport. 14.3 km of this would be underground. Corridor 2, of 22 km starting from Chennai Central Railway station to St. Thomas Mount. 9.7 km of this would be underground. Occupational health centre's role involved selection of miners and assessing their fitness to work under compressed air. Planning and execution of compression and decompression, health monitoring and treatment of compression related illnesses. More than thirty five thousand man hours of work was carried out under compressed air pressure ranged from 1.2 to 1.9 bar absolute. There were only three cases of pain only ( Type I) decompression sickness which were treated with recompression. Vigilant medical supervision, experienced lock operators and reduced working hours under pressure because of inclement environmental conditions viz. high temperature and humidity, has helped achieve this low incident. Tunnelling activity will increase in India as more cities will soon opt for underground metro railway. Indian standard IS 4138 – 1977 ” Safety code for working in compressed air” needs to be updated urgently keeping pace with modern working methods. PMID:29618908

  4. 11. Photographic copy of construction drawing, dated July 29, 1932, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of construction drawing, dated July 29, 1932, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-2511 SDO 139 (FLOOR PLANS) - Selfridge Field, Building Nos. 246 & 253, 246 Birch Street & 253 Wagner Street, Mount Clemens, Macomb County, MI

  5. 10. Photographic copy of construction drawing, dated February 6, 1931, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of construction drawing, dated February 6, 1931, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FOUNDATION, FIRST FLOOR PLANS, ELEVATIONS, DETAILS, PLAN NO. 6658-130. - Selfridge Field, Building No. 121, Wilbur Wright Avenue west of Ash Street, Mount Clemens, Macomb County, MI

  6. 7 CFR Exhibit L to Subpart A of... - Insured 10-Year Home Warranty Plan Requirements

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., construction inspection procedures, coverage provided and claims procedures. (5) A sample copy of the warranty... AGENCY, DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Construction and Other Development Pt. 1924, Subpt. A, Exh. L Exhibit L to Subpart A of Part 1924—Insured 10...

  7. The importance of cleanliness in a proper construction site management in malaysia: a contractor’s perspective

    NASA Astrophysics Data System (ADS)

    Shazwan, M. A.; Quintin, J. V.; Osman, N. A.; Suhaida, S. K.; Ma'arof, M. I. N.

    2017-11-01

    Construction site’s cleanliness and tidiness is one of top main concerns of construction site management. A good site management with adequate planning in regards to housekeeping will ensure safety to both the site’s working personnel and the neighbouring environment. This is especially of priority today due to the rapid growth of construction projects in Malaysia. Nevertheless, to date, statistics had shown that housekeeping related accidents happened repeatedly despite the awareness on site’s cleanliness and tidiness. The objective of this study was to explore constructor’s perspective on site cleanliness and tidiness. A set of questionnaire was distributed to thirty-four (34) Grade 7 CIDB contractors’ firms in Petaling Jaya. Petaling Jaya was chosen since this area are developed area covered with residential area and cleaning management an importance issues. The goals of the survey study were to identify the following items from the perception of the contractors: (i) the hierarchy of importance of several purposes in ensuring construction site’s cleanliness and tidiness, and (ii) the risk factors that influence a construction site’s level of cleanliness and tidiness. It was found that from the contractor’s perspective, ensuring a site cleanliness and tidiness is of importance mainly due to the need in protecting the environment, whilst, the least in cost saving. In addition, poor personnel’s working attitude was found to be the main risk factor that will influences a construction site’s level of cleanliness and tidiness. Conclusively, construction site’s cleanliness and tidiness is highly vital. Even so, for nationwide awareness on the topic matter will requires full cooperation from all related parties.

  8. Development and construct validation of the Client-Centredness of Goal Setting (C-COGS) scale.

    PubMed

    Doig, Emmah; Prescott, Sarah; Fleming, Jennifer; Cornwell, Petrea; Kuipers, Pim

    2015-07-01

    Client-centred philosophy is integral to occupational therapy practice and client-centred goal planning is considered fundamental to rehabilitation. Evaluation of whether goal-planning practices are client-centred requires an understanding of the client's perspective about goal-planning processes and practices. The Client-Centredness of Goal Setting (C-COGS) was developed for use by practitioners who seek to be more client-centred and who require a scale to guide and evaluate individually orientated practice, especially with adults with cognitive impairment related to acquired brain injury. To describe development of the C-COGS scale and examine its construct validity. The C-COGS was administered to 42 participants with acquired brain injury after multidisciplinary goal planning. C-COGS scores were correlated with the Canadian Occupational Performance Measure (COPM) importance scores, and measures of therapeutic alliance, motivation, and global functioning to establish construct validity. The C-COGS scale has three subscales evaluating goal alignment, goal planning participation, and client-centredness of goals. The C-COGS subscale items demonstrated moderately significant correlations with scales measuring similar constructs. Findings provide preliminary evidence to support the construct validity of the C-COGS scale, which is intended to be used to evaluate and reflect on client-centred goal planning in clinical practice, and to highlight factors contributing to best practice rehabilitation.

  9. Planning and design considerations in karst terrain

    NASA Astrophysics Data System (ADS)

    Fischer, J. A.; Greene, R. W.; Ottoson, R. S.; Graham, T. C.

    1988-10-01

    This article discusses the various steps that the authors feel are necessary to the successful progression of an engineered project sited in karst terrain. The procedures require a multidisciplined approach with liaison and cooperation among the various parties to the project. Initially, the prospective owner must have sufficient understanding of the potential engineering problems to incorporate the engineering geologist into the early stages of any planned acquisition. The first step in an investigation should include a review of the available geologic information, aerial photo interpretation, consultation with the State Geological Survey, and a geologic reconnaissance of the prospective site and surrounding area. A go-no-go decision as to purchase can often been made at an early time. Although, in some instances, more study is needed for a particularly intriguing property. The second stage should consider the various planning alternatives that are feasible based upon the limited available information. At this stage planning/purchase decisions can be made as to purchasing options, value of the property, design constraints, and the possible economic penalties that could be associated with the potential site construction. Various planning and construction alternatives should be considered in this phase of the work. The third stage should include a site investigation program of moderate size, consisting of test pits and/or exploratory borings. The borings should be drilled using water as the drilling fluid, with an experienced crew and qualified technical inspection. The authors find the use of geophysical techniques can be extremely misleading unless used in conjunction with exploratory drilling. Successful evaluations using geophysical procedures occur only under ideal conditions. The geotechnical viability of the plan and preliminary design should be investigated in the fourth phase. Additionally, the physical parameters required for the design of structures founded atop cavities can be obtained at this time. Several support schemes which incorporate cavity roof thickness, rock strength, and cavity space are discussed. Possible construction procedures include excavation and dental concrete, grouting, piers or piles to sound rock, or moving to another area. The relative economies of these procedures are discussed in relation to the size and depth of the soil or rock cavity, possible future cavity formation, magnitude of loading and acceptable safety factors.

  10. A BIM-based system for demolition and renovation waste estimation and planning.

    PubMed

    Cheng, Jack C P; Ma, Lauren Y H

    2013-06-01

    Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. [Communique on fulfillment of 1979 economic plan].

    PubMed

    1980-04-30

    In 1979 China's total industrial and agricultural output value reached 617,500 million yuan, exceeding the economic plan by 1.5%. National income was 337,000 million yuan, which was 7% over 1978. This progress was achieved under the leadership of the Communist Party of China and the people's government through conscientious implementation of the policy of readjustment, restructuring, consolidation, and improvement in the national economy. Discussion of the 1979 economic plan focuses on the following: industry; agriculture; capital construction; transport and post and telecommunications; domestic trade; foreign trade and tourism; science and technology and education and culture; health work and sports; the people's livelihood; and the population. The total 1979 industrial output value was 459,100 million yuan, 0.6% above the plan and 8.5% over 1978. The rate of increase of light industry exceeded that of heavy industry. Plans were met or surpassed for the output of 89 of 100 major products. The total value of agricultural output for 1979 was 158,400 million yuan, 4.2% above the plan and 8.6% higher than the previous year. The fixed assets turned over for use by capital construction units all over China came to 41,800 million yuan, a 17.4% increase over 1978. In 1979 the volume of railway freight transport was 558,800 million ton-kilometers, a 4.8% increase over 1978. The value of commodities purchased by commercial departments totaled 199,240 million yuan, topping 1978 by 14.5%. China had a population of 970.92 million by the end of 1979, 12.83 million people more than the 1978 figure. The birth rate was 17.9/1000 and the death rate was 6.2/1000. China's natural population growth rate was 11.7/1000.

  12. Minimizing delays in the Jordanian construction industry by adopting BIM technology

    NASA Astrophysics Data System (ADS)

    Btoush, M.; Harun, A. T.

    2017-11-01

    The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist.

  13. 33. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER 800-190. MOBILIZATION BUILDINGS; STANDARD DETAILS; SMOKE PIPE & FLUE DETAILS. - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  14. 40 CFR 49.9868 - Permits to construct.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9868 Permits to construct. Permits to...

  15. National Ignition Facility: Experimental plan

    NASA Astrophysics Data System (ADS)

    1994-05-01

    As part of the Conceptual Design Report (CDR) for the National Ignition Facility (NIF), scientists from Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), the University of Rochester's Laboratory for Laser Energetics (UR/LLE), and EG&G formed an NIF Target Diagnostics Working Group. The purpose of the Target Diagnostics Working Group is to prepare conceptual designs of target diagnostics for inclusion in the facility CDR and to determine how these specifications impact the CDR. To accomplish this, a subgroup has directed its efforts at constructing an approximate experimental plan for the ignition campaign of the NIF CDR. The results of this effort are contained in this document, the Experimental Plan for achieving fusion ignition in the NIF. This group initially concentrated on the flow-down requirements of the experimental campaign leading to ignition, which will dominate the initial efforts of the NIF. It is envisaged, however, that before ignition, there will be parallel campaigns supporting weapons physics, weapons effects, and other research. This plan was developed by analyzing the sequence of activities required to finally fire the laser at the level of power and precision necessary to achieve the conditions of an ignition hohlraum target, and to then use our experience in activating and running Nova experiments to estimate the rate of completing these activities.

  16. An approach to multiobjective optimization of rotational therapy. II. Pareto optimal surfaces and linear combinations of modulated blocked arcs for a prostate geometry.

    PubMed

    Pardo-Montero, Juan; Fenwick, John D

    2010-06-01

    The purpose of this work is twofold: To further develop an approach to multiobjective optimization of rotational therapy treatments recently introduced by the authors [J. Pardo-Montero and J. D. Fenwick, "An approach to multiobjective optimization of rotational therapy," Med. Phys. 36, 3292-3303 (2009)], especially regarding its application to realistic geometries, and to study the quality (Pareto optimality) of plans obtained using such an approach by comparing them with Pareto optimal plans obtained through inverse planning. In the previous work of the authors, a methodology is proposed for constructing a large number of plans, with different compromises between the objectives involved, from a small number of geometrically based arcs, each arc prioritizing different objectives. Here, this method has been further developed and studied. Two different techniques for constructing these arcs are investigated, one based on image-reconstruction algorithms and the other based on more common gradient-descent algorithms. The difficulty of dealing with organs abutting the target, briefly reported in previous work of the authors, has been investigated using partial OAR unblocking. Optimality of the solutions has been investigated by comparison with a Pareto front obtained from inverse planning. A relative Euclidean distance has been used to measure the distance of these plans to the Pareto front, and dose volume histogram comparisons have been used to gauge the clinical impact of these distances. A prostate geometry has been used for the study. For geometries where a blocked OAR abuts the target, moderate OAR unblocking can substantially improve target dose distribution and minimize hot spots while not overly compromising dose sparing of the organ. Image-reconstruction type and gradient-descent blocked-arc computations generate similar results. The Pareto front for the prostate geometry, reconstructed using a large number of inverse plans, presents a hockey-stick shape comprising two regions: One where the dose to the target is close to prescription and trade-offs can be made between doses to the organs at risk and (small) changes in target dose, and one where very substantial rectal sparing is achieved at the cost of large target underdosage. Plans computed following the approach using a conformal arc and four blocked arcs generally lie close to the Pareto front, although distances of some plans from high gradient regions of the Pareto front can be greater. Only around 12% of plans lie a relative Euclidean distance of 0.15 or greater from the Pareto front. Using the alternative distance measure of Craft ["Calculating and controlling the error of discrete representations of Pareto surfaces in convex multi-criteria optimization," Phys. Medica (to be published)], around 2/5 of plans lie more than 0.05 from the front. Computation of blocked arcs is quite fast, the algorithms requiring 35%-80% of the running time per iteration needed for conventional inverse plan computation. The geometry-based arc approach to multicriteria optimization of rotational therapy allows solutions to be obtained that lie close to the Pareto front. Both the image-reconstruction type and gradient-descent algorithms produce similar modulated arcs, the latter one perhaps being preferred because it is more easily implementable in standard treatment planning systems. Moderate unblocking provides a good way of dealing with OARs which abut the PTV. Optimization of geometry-based arcs is faster than usual inverse optimization of treatment plans, making this approach more rapid than an inverse-based Pareto front reconstruction.

  17. Life cycle study of different constructive solutions for building enclosures.

    PubMed

    Garcia-Ceballos, Luz; de Andres-Díaz, Jose Ramon; Contreras-Lopez, Miguel A

    2018-06-01

    The construction sector must advance in a more sustainable way and to achieve this goal, the application of global methodologies is needed. These methodologies should take into account all life stages of a building: planning, design, construction, use and demolition. The quantity and variety of the materials used in building construction condition the buildings' environmental and energy impacts. Life Cycle Assessment offers a standardized framework to evaluate the environmental loads of a product, process or activity. This work aims to demonstrate the feasibility of using Life Cycle Assessment (LCA) to select facilities in the construction sector, which minimize environmental and energy impacts. To facilitate the understanding of the proposed methodology, a comparative LCA is performed, to determine the type of thermal insulating material in a double sheet ceramic façade and its thickness, which allows reducing the environmental impacts associated to the enclosure. The three most used enclosure types used in the city of Malaga (Spain) have been selected for this study. The results show the adequacy of the procedure used. Copyright © 2018 Elsevier B.V. All rights reserved.

  18. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  19. Dynamics and statics of nonaxisymmetric liquid bridges

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.; Resnick, Andy; Zhang, Yiqiang; Fedoseyev, A.

    1994-01-01

    We finished the construction of the experimental apparatus and the design and testing of some of the visualization and data acquisition techniques. Experimental work focused on three areas: force measurements, loss of stability to nonaxisymmetric bridges, and vibration behavior. The experimental work is summarized in section 2. Selected results from our force measurement experiments are outlined in section 3. In addition we worked on the theory of the dynamic stability of axisymmetric bridges and undertook numerical simulation of the effects of inclined gravity vectors on the minimum volume stability limit for static bridges. The results and status of our theoretical work and numerical simulation are described in section 4. Papers published and in preparation, conference presentations, etc., are described in section 5. Work planned for the third year is discussed in section 6. References cited in the report are listed in section 7.

  20. Investigation of Effect Additive Phase Change Materials on the Thermal Conductivity

    NASA Astrophysics Data System (ADS)

    Nakielska, Magdalena; Chalamoński, Mariusz; Pawłowski, Krzysztof

    2017-10-01

    The aim of worldwide policy is to reduce the amount of consumed energy and conventional fuels. An important branch of the economy that affects the energy balance of the country is construction industry. In Poland, since January 1st, 2017 new limit values have been valid regarding energy saving and thermal insulation of buildings. To meet the requirements of more and more stringent technical and environmental standards, new technological solutions are currently being looked for. When it comes to the use of new materials, phase-change materials are being widely introduced into construction industry. Thanks to phase-change materials, we can increase the amount of heat storage. Great thermal inertia of the building provides more stable conditions inside the rooms and allows the use of unconventional sources of energy such as solar energy. A way to reduce the energy consumption of the object is the use of modern solutions for ventilation systems. An example is the solar chimney, which supports natural ventilation in order to improve internal comfort of the rooms. Numerous studies are being carried out in order to determine the optimal construction of solar chimneys in terms of materials and construction parameters. One of the elements of solar chimneys is an absorption plate, which affects the amount of accumulated heat in the construction. In order to carry out the research on the thermal capacity of the absorption plate, the first research work has been already planned. The work presents the research results of a heat-transfer coefficient of the absorption plates samples made of cement, aggregate, water, and phase-change material in different volume percentage. The work also presents methodology and the research process of phase-change material samples.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodson, J.O.

    This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world's first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC's CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodson, J.O.

    This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world`s first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC`s CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less

  3. 12. Photographic copy of construction drawing, dated June 7, 1933, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photographic copy of construction drawing, dated June 7, 1933, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-2517, SDO 186 F41 (FLOOR PLAN) - Selfridge Field, Building Nos. 248, 252 & 254, 248 Birch Street & 252, 254 Wagner Street, Mount Clemens, Macomb County, MI

  4. Purpose Designed Facilities. School Buildings Planning, Design, and Construction Series No. 4.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on issues involving school space design and the kinds of spaces required in schools, including lecture spaces and seminar rooms,…

  5. Principles of Good School Building Design. School Buildings Planning, Design, and Construction Series No. 3.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on school building design issues, such as the fundamentals of good design and designs that accommodate change, issues affecting…

  6. Making the Most of Your School Site. School Buildings Planning, Design, and Construction Series No. 2.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on site selection covering selection criteria; traffic issues; and site services, such as water, power, and sewer. Additionally…

  7. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Treesearch

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  8. Technique for Determination of Rational Boundaries in Combining Construction and Installation Processes Based on Quantitative Estimation of Technological Connections

    NASA Astrophysics Data System (ADS)

    Gusev, E. V.; Mukhametzyanov, Z. R.; Razyapov, R. V.

    2017-11-01

    The problems of the existing methods for the determination of combining and technologically interlinked construction processes and activities are considered under the modern construction conditions of various facilities. The necessity to identify common parameters that characterize the interaction nature of all the technology-related construction and installation processes and activities is shown. The research of the technologies of construction and installation processes for buildings and structures with the goal of determining a common parameter for evaluating the relationship between technologically interconnected processes and construction works are conducted. The result of this research was to identify the quantitative evaluation of interaction construction and installation processes and activities in a minimum technologically necessary volume of the previous process allowing one to plan and organize the execution of a subsequent technologically interconnected process. The quantitative evaluation is used as the basis for the calculation of the optimum range of the combination of processes and activities. The calculation method is based on the use of the graph theory. The authors applied a generic characterization parameter to reveal the technological links between construction and installation processes, and the proposed technique has adaptive properties which are key for wide use in organizational decisions forming. The article provides a written practical significance of the developed technique.

  9. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  10. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  11. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  12. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  13. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  14. The Economic Impact of Implementing the Cincinnati Public Schools' Facilities Master Plan on Greater Cincinnati.

    ERIC Educational Resources Information Center

    Rexhausen, Jeff

    The construction proposed in the Cincinnati Public Schools' Facilities Master Plan will have a significant impact on the greater Cincinnati, Ohio, economy. Highlights include: (1) the Facilities Master Plan of the Cincinnati Public Schools envisions a 10-year program with $985 million in construction spending. The funding of this program includes…

  15. Planning and evaluation parameters for offshore complexes

    NASA Technical Reports Server (NTRS)

    Sincoff, M. Z. (Editor); Dajani, J. S. (Editor)

    1976-01-01

    Issues are presented for consideration in the planning and design of offshore artificial complexes. The construction of such complexes, their social, economic, and ecological impacts, and the legal-political-institutional environments within which their development could occur, are discussed. Planning, design, and construction of near-shore complexes located off the Mid-Atlantic coast of the United States is emphasized.

  16. 40 CFR Table 1 to Subpart Ggg of... - States That Have an Approved and Effective State Plan a

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or Reconstructed Since May 30, 1991... this Federal plan if it commenced construction before May 30, 1991 and has not been modified or...

  17. 40 CFR Table 1 to Subpart Ggg of... - States That Have an Approved and Effective State Plan a

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or Reconstructed Since May 30, 1991... this Federal plan if it commenced construction before May 30, 1991 and has not been modified or...

  18. The American nuclear construction craftsmen: Will we be ready to build again

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bravo, R.

    1990-01-01

    The present state of nuclear plant maintenance and operations support reflects sexual, ethnic, and radical integration; continued educational advances; some computer literacy; mixed trades in maintenance; detailed training for maintenance and operations work in the operating plant; plant safety awareness and respect; need for top-quality, take the time to do it right mentality; and planning. With no new nuclear construction, what will be the specific talents, focus, and contributions that the craftsmen can be expected to bring to the project To be prepared to successfully manage the next generation of nuclear plant construction, the industry must be acutely aware ofmore » the needs of the labor pool. To be aware of the needs requires an intimate knowledge of the present state of the craft talent, the changed expectations of their contributions, and the effects of new technologies, materials, methods, and individuals that will be used to design and build.« less

  19. Beyond the classroom: a case study of immigrant safety liaisons in residential construction.

    PubMed

    Ochsner, Michele; Marshall, Elizabeth G; Martino, Carmen; Pabelón, Marién Casillas; Kimmel, Louis; Rostran, Damaris

    2012-01-01

    Latino day laborers often work at dangerous construction sites with little power to change conditions. We describe the development, implementation, and early-stage results of a program to train immigrant day laborers as safety liaisons. These are construction workers prepared to recognize and respond to health and safety hazards. Based in Newark, NJ, the project involves collaboration between New Labor, a membership-based worker center, and university researchers and labor educators. Safety liaisons undergo training and receive ongoing support for their roles. Both qualitative and quantitative data are collected to monitor progress. Although lacking in formal authority, safety liaisons have prompted improvements at specific sites, filed OSHA complaints, and developed a local worker council. Participatory training methods, opportunities for leadership outside the classroom, and participation in project planning have strengthened liaisons' effectiveness, leadership skills, and commitment. The safety liaison approach could be adapted by worker centers and their partner organizations.

  20. Feasibility of remotely manipulated welding in space. A step in the development of novel joining technologies

    NASA Technical Reports Server (NTRS)

    Masubuchi, K.; Agapakis, J. E.; Debiccari, A.; Vonalt, C.

    1983-01-01

    In order to establish permanent human presence in space technologies of constructing and repairing space stations and other space structures must be developed. Most construction jobs are performed on earth and the fabricated modules will then be delivered to space by the Space Shuttle. Only limited final assembly jobs, which are primarily mechanical fastening, will be performed on site in space. Such fabrication plans, however, limit the designs of these structures, because each module must fit inside the transport vehicle and must withstand launching stresses which are considerably high. Large-scale utilization of space necessitates more extensive construction work on site. Furthermore, continuous operations of space stations and other structures require maintenance and repairs of structural components as well as of tools and equipment on these space structures. Metal joining technologies, and especially high-quality welding, in space need developing.

Top