Sample records for planning activity final

  1. 77 FR 76515 - Notice of Availability of the National Petroleum Reserve-Alaska Final Integrated Activity Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAK930000.L13100000.DS0000] Notice of Availability of the National Petroleum Reserve-Alaska Final Integrated Activity Plan/Environmental Impact... of Land Management (BLM), Alaska State Office, is issuing the National Petroleum Reserve in Alaska...

  2. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling... Memoranda; determination of final project boundaries; and preliminary real estate work to the point where... estate activities of the Corps are extremely sensitive, since they disrupt the lives of individuals and...

  3. Freight planning support system : final summary report

    DOT National Transportation Integrated Search

    2003-07-01

    This report summarizes the activities and the findings of the Freight Planning Support System (FPSS) project conducted for the North Jersey Transportation Planning Authority (NJTPA). The underlying purpose of the project is to allow for better projec...

  4. Feasibility Study for Low Drag Acoustic Liners Final Report

    NASA Technical Reports Server (NTRS)

    Riedel, Brian; Wu, Jackie

    2017-01-01

    This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.

  5. The Collaborative Planning Outreach Project: Building Comprehensive Early Childhood Systems. Final Report.

    ERIC Educational Resources Information Center

    Smith, Barbara J.

    This final report describes the objectives, activities and outcomes of a federally funded initiative to train and assist early childhood interagency teams in a model of planning systems and services for all young children, including children with disabilities and other special needs. The project is based on the value of stakeholder ownership in…

  6. Northrop TRIGA facility decommissioning plan versus actual results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gardner, F.W.

    1986-01-01

    This paper compares the TRIGA facility decontamination and decommissioning (D and D) plan to the actual results and discusses key areas where operational activities were impacted by the final US Nuclear Regulatory Commission approved D and D plan. A discussion of fuel transport, release criteria, and release survey plans is included.

  7. Medicaid program; elimination of reimbursement under Medicaid for school administration expenditures and costs related to transportation of school-age children between home and school. Final rule.

    PubMed

    2007-12-28

    Under the Medicaid program, Federal payment is available for the costs of administrative activities "as found necessary by the Secretary for the proper and efficient administration of the State plan." This final rule eliminates Federal Medicaid payment for the costs of certain school-based administrative and transportation activities because the Secretary has found that these activities are not necessary for the proper and efficient administration of the Medicaid State plan and are not within the definition of the optional transportation benefit. Based on these determinations, under this final rule, Federal Medicaid payments will no longer be available for administrative activities performed by school employees or contractors, or anyone under the control of a public or private educational institution, and for transportation from home to school. In addition, this final rule responds to public comments received on the September 7, 2007 proposed rule.

  8. Therapy Dogs on Campus: A Counseling Outreach Activity for College Students Preparing for Final Exams

    ERIC Educational Resources Information Center

    Barker, Sandra B.; Barker, Randolph T.; Schubert, Christine M.

    2017-01-01

    A university counseling center engaged a therapy dog program for an outreach activity to reduce stress as students prepare for final exams at a large culturally diverse university. This article describes the rationale, planning, and implementation of the activity; presents an evaluation summary; and provides recommendations and implications for…

  9. Word Order and Voice Influence the Timing of Verb Planning in German Sentence Production.

    PubMed

    Sauppe, Sebastian

    2017-01-01

    Theories of incremental sentence production make different assumptions about when speakers encode information about described events and when verbs are selected, accordingly. An eye tracking experiment on German testing the predictions from linear and hierarchical incrementality about the timing of event encoding and verb planning is reported. In the experiment, participants described depictions of two-participant events with sentences that differed in voice and word order. Verb-medial active sentences and actives and passives with sentence-final verbs were compared. Linear incrementality predicts that sentences with verbs placed early differ from verb-final sentences because verbs are assumed to only be planned shortly before they are articulated. By contrast, hierarchical incrementality assumes that speakers start planning with relational encoding of the event. A weak version of hierarchical incrementality assumes that only the action is encoded at the outset of formulation and selection of lexical verbs only occurs shortly before they are articulated, leading to the prediction of different fixation patterns for verb-medial and verb-final sentences. A strong version of hierarchical incrementality predicts no differences between verb-medial and verb-final sentences because it assumes that verbs are always lexically selected early in the formulation process. Based on growth curve analyses of fixations to agent and patient characters in the described pictures, and the influence of character humanness and the lack of an influence of the visual salience of characters on speakers' choice of active or passive voice, the current results suggest that while verb planning does not necessarily occur early during formulation, speakers of German always create an event representation early.

  10. Planning the Transition to Long-Term Stewardship for the River Corridor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cearlock, C.S.; Lerch, J.A.; Sands, J.P.

    2007-07-01

    Long-term stewardship refers to all activities necessary to ensure protection of human health and the environment following completion of remediation, disposal, or stabilization of a site or a portion of a site. Efforts to establish the proposed approach and criteria to be met for long-term stewardship in the river corridor of the Hanford Site in Richland, Washington, are currently being established and a draft plan is expected to be completed in mid-2007 to facilitate planning for a smooth and seamless transition to long-term stewardship. Once the initial criteria have been established, supporting information will be gathered as the work proceeds.more » Near the end of cleanup actions under the River Corridor Closure Contract, these criteria will be finalized in a long-term stewardship plan that documents how the criteria have been met. In addition, the final long-term stewardship plan will also contain a proposed Finding of Suitability to Transfer in accordance with Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Section 120(h) [1]. This final long-term stewardship plan will provide the foundation for post-River Corridor Closure Contract and management activities in the river corridor pending actual property transfer from the U.S. Department of Energy. (authors)« less

  11. Data integration for statewide transportation planning : final report

    DOT National Transportation Integrated Search

    2009-08-01

    The goal of this study was to investigate the data availability, accessibility, and interoperability issues arisen from the statewide : transportation planning activities undertaken at WisDOT and to identify possible approaches for addressing these i...

  12. European Perceptions of Plan Colombia: A Virtual Contribution to a Virtual War and Peace Plan?

    DTIC Science & Technology

    2001-05-01

    government for more effective control of the paramilitary forces may help. A greater surge of European activism backed by development assistance funds and...economic, security, and political spillover effects for neighboring countries. Finally and logically, the author reflects the European concern that...economic, security, and political spillover effects for neighboring countries. Finally and logically, Roy reflects the European concern that whatever

  13. Methane Hydrate Field Program: Development of a Scientific Plan for a Methane Hydrate-Focused Marine Drilling, Logging and Coring Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Myers, Greg

    This final report document summarizes the activities undertaken and the output from three primary deliverables generated during this project. This fifteen month effort comprised numerous key steps including the creation of an international methane hydrate science team, determining and reporting the current state of marine methane hydrate research, convening an international workshop to collect the ideas needed to write a comprehensive Marine Methane Hydrate Field Research Plan and the development and publication of that plan. The following documents represent the primary deliverables of this project and are discussed in summary level detail in this final report: Historical Methane Hydrate Projectmore » Review Report; Methane Hydrate Workshop Report; Topical Report: Marine Methane Hydrate Field Research Plan; and Final Scientific/Technical Report.« less

  14. Forecast and capacity planning for Nogales' ports of entry : [summary].

    DOT National Transportation Integrated Search

    2009-12-01

    This document provides the final report of the activities performed under the project : Nogales POEs Traffic Study: Forecast and Capacity Planning for Nogales Ports of Entry : sponsored by the Arizona Department of Transportation (ADOT) under Gran...

  15. NSF final project report planning and implementation of the U.S. Joint Global Ocean Flux Study (U.S. JGOFS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Livingston, Hugh D.

    1996-07-01

    Conducted planning and implementation of ocean carbon dioxide hydrographic surveys ocean process studies, time-series studies of Bermuda and Hawaii, and sponsored scientific workshops for those activities.

  16. Constraint-based Attribute and Interval Planning

    NASA Technical Reports Server (NTRS)

    Jonsson, Ari; Frank, Jeremy

    2013-01-01

    In this paper we describe Constraint-based Attribute and Interval Planning (CAIP), a paradigm for representing and reasoning about plans. The paradigm enables the description of planning domains with time, resources, concurrent activities, mutual exclusions among sets of activities, disjunctive preconditions and conditional effects. We provide a theoretical foundation for the paradigm, based on temporal intervals and attributes. We then show how the plans are naturally expressed by networks of constraints, and show that the process of planning maps directly to dynamic constraint reasoning. In addition, we de ne compatibilities, a compact mechanism for describing planning domains. We describe how this framework can incorporate the use of constraint reasoning technology to improve planning. Finally, we describe EUROPA, an implementation of the CAIP framework.

  17. Northrop Triga facility decommissioning plan versus actual results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gardner, F.W.

    1986-01-01

    This paper compares the Triga facility decontamination and decommissioning plan to the actual results and discusses key areas where operational activities were impacted upon by the final US Nuclear Regulatory Commission (NRC)-approved decontamination and decommissioning plan. Total exposures for fuel transfer were a factor of 4 less than planned. The design of the Triga reactor components allowed the majority of the components to be unconditionally released.

  18. 78 FR 13080 - Notice of Availability of Record of Decision for the National Petroleum Reserve-Alaska Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ...] Notice of Availability of Record of Decision for the National Petroleum Reserve-Alaska Final Integrated... National Petroleum Reserve in Alaska (NPR-A) Final Integrated Activity Plan (IAP). The Secretary of the... required by the Naval Petroleum Reserves Production Act, as amended, and for application for onshore...

  19. Connected commercial vehicles-integrated truck project : vehicle build and build test plan, final technical report.

    DOT National Transportation Integrated Search

    2000-12-01

    This paper brings together the findings of activities that addressed the impacts of nontechnical barriers and constraints that might impede the progress of Intelligent Transportation Systems (ITS) programs. It discusses how the planning and deploymen...

  20. International Workshop on Communications in Family Planning Programs (Teheran, June 6-18, 1970). Final Report.

    ERIC Educational Resources Information Center

    Blake, Robert R., Ed.; Wolfe, Suzanne, R., Ed.

    This report presents some of the proceedings of a workshop on communications in family planning programs held in Teheran, Iran. A total of 82 participants from 15 Mid-Eastern and African countries attended. The purpose of the workshop was to assist each country to prepare a work plan for information and education activities related to population…

  1. Desert Peak East Enhanced Geothermal Systems (EGS) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zemach, Ezra; Drakos, Peter; Spielman, Paul

    2013-09-30

    This manuscript is a draft to replaced with a final version at a later date TBD. A summary of activities pertaining to the Desert Peak EGS project including the planning and resulting stimulation activities.

  2. Charlotte Circle Outreach. Final Report.

    ERIC Educational Resources Information Center

    Calhoun, Mary Lynne; Rose, Terry L.; Prendergast, Donna

    This final report details the activities of the Charlotte Circle Outreach, a program designed to provide technical assistance and training to early intervention programs offering services to infants and young children with substantial disabilities, ages birth through two years. This mission was accomplished through cooperative planning with…

  3. Understanding of Student Task Interpretation, Design Planning, and Cognitive Strategies during Engineering Design Activities in Grades 9-12. Final Report. Research in Engineering and Technology Education

    ERIC Educational Resources Information Center

    Lawanto, Oenardi

    2011-01-01

    The objective of this study was to describe the task interpretation of students engaged in a design activity and determine the extent to which students translate their understanding of their design task to their planning and cognitive strategies. Twenty-nine students at one Colorado high school participated in this study. Students worked…

  4. 76 FR 81962 - Final Environmental Impact Statement for General Management Plan, Ross Lake National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... soundscapes, and scenery through traditional outdoor activities. The NPS would actively manage to reduce... Ross Lake NRA in order to protect and enhance soundscapes and wilderness character, experience, and...

  5. Support services relating to geothermal programs. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-08-01

    Activities designed to assist in the assessment of processes through which geopressured methane production and geopressure-geothermal power can be increased are discussed. Progress is reported on the following: general support, hot-dry-rock review, R and D plan, and the Edna Delcambre final report. (MHR)

  6. Is pre-retirement planning always good? An exploratory study of retirement adjustment among Hong Kong Chinese retirees.

    PubMed

    Yeung, Dannii Y

    2013-01-01

    The impacts of four types of pre-retirement planning activities (financial, health, social life, and psychological planning) on retirement adjustment were investigated in a sample of Chinese retirees residing in Hong Kong. This study consisted of two phases of data collection, pre-retirement and post-retirement phases. Pre-retirement planning behaviors and psychological health (including attitudes toward retirement, adjustment to retirement, anxiety toward retirement, psychological well-being (PWB), and psychological distress) six months before and after retirement were measured. The final sample consisted of 90 Hong Kong Chinese retirees. Compared with the pre-retirement phase, retirees exhibited more positive attitudes toward retirement and better adjustment after they had actually retired, whereas their level of anxiety and psychological distress remained low over time. Pre-retirement planning was found to be predictive of changes in psychological health, though its impact was not always positive depending on the type of planning activities. In particular, greater psychological planning was associated with positive attitudes toward retirement and better PWB, whereas more social life planning activities were associated with greater psychological distress. In addition to financial and health planning, psychological planning activities should also be prompted to facilitate a smooth adjustment to retirement.

  7. 40 CFR 265.112 - Closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND.... By May 19, 1981, or by six months after the effective date of the rule that first subjects a facility... description of other activities necessary during the partial and final closure periods to ensure that all...

  8. Strategic Planning: The Commission on School's Final Report.

    ERIC Educational Resources Information Center

    Gose, Kenneth F.

    1995-01-01

    Presents findings from activities undertaken by the North Central Association to determine strategic planning needs for 1995-2000, including a survey of 213 member schools and an environmental scan. Indicates that 91% of the members expressed the importance of keeping schools informed about standards. Lists eight critical elements discovered in…

  9. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lambert, K.A.; Mitchell, M.M.; Jean, D.

    1997-09-01

    This report contains the Appendices A-L including Voluntary Corrective Measure Plans, Waste Management Plans, Task-Specific Health and Safety Plan, Analytical Laboratory Procedures, Soil Sample Results, In-Situ Gamma Spectroscopy Results, Radionuclide Activity Summary, TCLP Soil Sample Results, Waste Characterization Memoranda, Waste Drum Inventory Data, Radiological Risk Assessment, and Summary of Site-Specific Recommendations.

  10. Interagency Planning and Support Project. Final Report.

    ERIC Educational Resources Information Center

    Salisbury, Christine

    This final report describes the activities and outcomes of a federally funded project designed to develop, implement, and evaluate a systemically oriented process model for improving the coordination of education and human services for young children with identified disabilities and their families at the local level. The project developed and used…

  11. Coosa River Storage Annex, Talladega, Alabama Environmental Investigation, Final Management and Resources Utilization Plan

    DTIC Science & Technology

    1991-02-01

    to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as

  12. Educational Technology, E.C.I.A. Chapter 2. Final Evaluation Report.

    ERIC Educational Resources Information Center

    District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.

    The Planning, Monitoring and Implementing (PMI) Evaluation Model for Decision-Making was used by the District of Columbia Public Schools to monitor their Office of Educational Technology in its efforts to provide direction and coordination for computer related activities, and to plan and implement educational television projects in math and…

  13. Development of State Plan for Career Education in Alabama. Final Report.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery.

    This state plan for career education in Alabama describes the first-year objectives and operational procedures of the State Advisory Council for Career Education. Activities of the following six task forces are reported: (1) needs assessment for grades K-12, (2) postsecondary needs assessment, (3) noneducational (business and industry) needs…

  14. A Computer Simulation Modeling Tool to Assist Colleges in Long-Range Planning. Final Report.

    ERIC Educational Resources Information Center

    Salmon, Richard; And Others

    Long-range planning involves the establishment of educational objectives within a rational philosophy, the design of activities and programs to meet stated objectives, the organization and allocation of resources to implement programs, and the analysis of results in terms of the objectives. Current trends of educational growth and complexity…

  15. 76 FR 13401 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Mine Pits, Haul Roads, Water Management Structures, and Overburden Disposal Areas, Implementation..., Final EIS, TVA, KY, Tennessee Valley Authority (TVA) Integrated Resource Plan (IRP), To Address the... Activities, Proposal to Support and Conduct Current, Emerging, and Future Training Activities, Implementation...

  16. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poderis, Reed J.; King, Rebecca A.

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping,more » tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400« less

  17. United States Air Force 611th Air Support Group Civil Engineering Squadron, Elmendorf AFB, Alaska. Remedial investigation and feasibility study Point Lay Radar Installation, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karmi, S.

    1996-03-04

    The United States Air Force (Air Force) has prepared this Remedial Investigation/Feasibility Study (RI/FS) report to present the results of RI/FS activities at four sites located at the Point Lay radar installation. The remedial investigation (RI) field activities were conducted at the Point Lay radar installation during the summer of 1993. The four sites at Point Lay were investigated because they were suspected of being contaminated with hazardous substances. RI activities were conducted using methods and procedures specified in the RI/FS Work Plan, Sampling and Analysis Plan (SAP), and Health and Safety Plan.

  18. Effects of planning strategies on writing dynamics and final texts.

    PubMed

    Limpo, Teresa; Alves, Rui A

    2018-06-12

    Expert writing involves the interaction among three cognitively demanding processes: planning, translating, and revising. To manage the cognitive load brought on by these processes, writers frequently use strategies. Here, we examined the effects of planning strategies on writing dynamics and final texts. Before writing an argumentative text with the triple-task technique, 63 undergraduates were asked either to elaborate an outline with the argumentative structure embedded (structure-based planning condition), to provide a written list of ideas for the text (list-based planning condition), or to do a non-writing-related filler task (no planning condition). Planning showed no effects on the length of the pre-writing pause and cognitive effort, but influenced writing processes occurrences. Compared to participants in the no-planning condition, those in the planning conditions showed a later activation of revising. Moreover, participants in the structure-based condition were mainly focused on translating in the beginning and middle of composition, whereas their peers tended to distribute their attention among all processes. Planning ahead of writing also resulted in texts with longer words, produced at a higher rate. Only the structure-based planning strategy led to an increase in the number of argumentation elements as well as in essays' persuasiveness and overall quality. There was, however, no indication that these improvements in final texts were associated with changes in the dynamics of writing. Overall, the use of structure-based plans seems to be an effective and efficient way of improving undergraduates' argumentative writing. Copyright © 2018 Elsevier B.V. All rights reserved.

  19. Demonstration of the Competency-Based Curriculum for Distributive Education and Distributive Cooperative Training Programs. Final Report.

    ERIC Educational Resources Information Center

    Marshall Univ., Huntington, WV. Dept. of Occupational, Adult, and Safety Education.

    A core curriculum, training plans, and implementation guide developed by the project are included in this final report, which describes activities to resolve problems encountered by teachers using the IDECC (Interstate Distributive Education Curriculum Consortium) system designed for distributive education (DE) and diversified cooperative training…

  20. Science sequence design

    NASA Technical Reports Server (NTRS)

    Koskela, P. E.; Bollman, W. E.; Freeman, J. E.; Helton, M. R.; Reichert, R. J.; Travers, E. S.; Zawacki, S. J.

    1973-01-01

    The activities of the following members of the Navigation Team are recorded: the Science Sequence Design Group, responsible for preparing the final science sequence designs; the Advanced Sequence Planning Group, responsible for sequence planning; and the Science Recommendation Team (SRT) representatives, responsible for conducting the necessary sequence design interfaces with the teams during the mission. The interface task included science support in both advance planning and daily operations. Science sequences designed during the mission are also discussed.

  1. A Center on Effective Secondary Schools. Final Report of Planning Grant.

    ERIC Educational Resources Information Center

    Newmann, Fred M.; Smith, Marshall S.

    Work being conducted by the Wisconsin Center for Education Research on the topic of effective secondary schools is described. The first section of this paper contains a summary of planning activities. A 5-year proposal for the Center on Effective Secondary Schools is described as well as an evaluation of that proposal. The second section presents…

  2. Final Range Wide Environmental Impact Statement

    DTIC Science & Technology

    2001-07-01

    military presence at YPG protects natural resources by limiting access and activities, preventing or mitigating many impacts. The military presence in the...Pollution Prevention Plan; and Spill Prevention , Control and Countermeasures Plan (SPCCP). Environmental programs are responsible for...Act (CAA), PL 88-206 as amended, establishes National Ambient Air Quality Standards (NAAQS) for the control of criteria air pollutants to prevent

  3. Early Owner Planning Leads to Project Success

    ERIC Educational Resources Information Center

    Gainsboro, Dan

    2006-01-01

    In the vast majority of building projects, decisions made in the first 10 percent of project activity directly determine 90 percent of the final cost and schedule. When a project is poorly planned, project costs can expand beyond estimates by as much as 50 percent. Since the owner's rate of spending increases as a building project proceeds,…

  4. The New Jersey Department of Higher Education's Health Manpower Planning Contract. Final Comprehensive Report.

    ERIC Educational Resources Information Center

    Tomson, Jon; Vasilenko, Patricia

    This report of the New Jersey Department of Higher Education's Health Manpower Planning Contract describes project activities and assessment methods and models, presents data on employment supply and demand, and provides samples of questionnaires and forms that were used. The department was required under contract to: survey and evaluate pertinent…

  5. Knowing Where You're Going: Planning for Meaningful Course Closure

    ERIC Educational Resources Information Center

    Burgess-Van Aken, Barbara

    2017-01-01

    A literature review on approaches to a final course session reveals a dearth of attention to the issue. Options for last-day activities fall into three categories: professor-centered, activity-focused, and student-driven. Using the criterion that meaningful course closure calls for last-day activities that engage students in reflection not only…

  6. "Project Outreach," Final Report, December 31, 1979.

    ERIC Educational Resources Information Center

    Latzer, Robert M.

    Fall 1979 activities for Project Outreach, a faculty development program at Jersey City State College, are described. Problems involved in carrying out these activities, a statement of expenditures and balances, and a set of recommendations are covered. Four areas of activity planned at the college were: a second series of study skills seminars, a…

  7. Put two (and two) together to make the most of physical activity and healthy nutrition - A longitudinal online study examining cross-behavioural mechanisms in multiple health behaviour change.

    PubMed

    Paech, Juliane; Lippke, Sonia

    2017-01-01

    Recommendations for physical activity and for fruit and vegetable intake are often not translated into action due to deficits in self-regulatory strategies. The present study examines the interplay of intention, intergoal facilitation, action and coping planning and self-regulation in facilitating physical activity and healthy nutrition. In an online study, intentions and behaviours were assessed at baseline, intergoal facilitation and planning at 4-week follow-up, self-regulation, physical activity and nutrition at 6-month follow-up in a non-clinical sample. The final sample (n = 711) consisted of 27.2% men, the age ranged from 16 to 78 years. Sequential mediations were tested. Intergoal facilitation, planning and self-regulation mediated the link from intention to physical activity and nutrition; the specific indirect effects were significant. Findings suggest that intergoal facilitation and self-regulation can facilitate behaviour change, in addition to planning. Cross-behavioural mechanisms might facilitate lifestyle change in several domains.

  8. ActiveWV: a systematic approach to developing a physical activity plan for West Virginia.

    PubMed

    Elliott, Eloise; Jones, Emily; Bulger, Sean

    2014-03-01

    Modeled after the National Physical Activity Plan (NPAP), ActiveWV 2015: The West Virginia Physical Activity Plan was developed to provide strategic direction for physical activity promotion within the state. The purpose of this manuscript is to describe the systematic approach taken in developing ActiveWV. Plan development began with establishing capacity and leadership among key stakeholders representing all societal sectors. A multiphase, statewide decision-making process allowed for input across sectors and geographic regions. The process results identified five priority areas that served as the conceptual framework for ActiveWV. Sector teams, comprised of key organization stakeholders across the eight sectors, finalized the sector-specific strategies and tactics using the NPAP evidence-based recommendations, results from a formalized strategic process, and the teams' expertise and experience. ActiveWV was officially released on January 19, 2012 at the State Capitol in Charleston, West Virginia. Community events throughout the state surrounded the release and celebrated West Virginia Physical Activity Day. Ongoing implementation and dissemination efforts are underway at state and local levels. As the NPAP calls for states and communities to develop plans that meet the needs of their particular context, other states may find the lessons learned from West Virginia helpful in the development process.

  9. A Proposal on How to Make Educational Activities Deep-rooted in the Local Community Successful

    NASA Astrophysics Data System (ADS)

    Kaneshige, Akihiro; Momota, Masahiro; Sadano, Syuichiro; Ishitobi, Takaaki; Murashige, Kiyoshi

    The purpose of this paper is to propose what is necessary for institutions of higher education to succeed in contributive activities for the local community. First, an outline of status quo of such activities is provided. Next, a discussion of how our college plans, organizes and performs such activities with “the Planning and Coordination Office” and “the Division of Cooperation with the Local Community” as the central divisions will be offered. Following this, clarification of some of the problems to be solved in regard to the activities is discussed. Finally, it is argued that organizational and continuous approaches are essential to make the activities successful.

  10. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  11. Automated planning for intelligent machines in energy-related applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; de Saussure, G.; Barhen, J.

    1984-01-01

    This paper discusses the current activities of the Center for Engineering Systems Advanced Research (CESAR) program related to plan generation and execution by an intelligent machine. The system architecture for the CESAR mobile robot (named HERMIES-1) is described. The minimal cut-set approach is developed to reduce the tree search time of conventional backward chaining planning techniques. Finally, a real-time concept of an Intelligent Machine Operating System is presented in which planning and reasoning is embedded in a system for resource allocation and process management.

  12. Community and facility-level engagement in planning and budgeting for the government health sector--a district perspective from Kenya.

    PubMed

    O'Meara, Wendy Prudhomme; Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine; McKenzie, F Ellis

    2011-03-01

    Health systems reform processes have increasingly recognized the essential contribution of communities to the success of health programs and development activities in general. Here we examine the experience from Kilifi district in Kenya of implementing annual health sector planning guidelines that included community participation in problem identification, priority setting, and planning. We describe challenges in the implementation of national planning guidelines, how these were met, and how they influenced final plans and budgets. The broad-based community engagement envisaged in the guidelines did not take place due to the delay in roll out of the Ministry of Health-trained community health workers. Instead, community engagement was conducted through facility management committees, though in a minority of facilities, even such committees were not involved. Some overlap was found in the priorities highlighted by facility staff, committee members and national indicators, but there were also many additional issues raised by committee members and not by other groups. The engagement of the community through committees influenced target and priority setting, but the emphasis on national health indicators left many local priorities unaddressed by the final work plans. Moreover, it appears that the final impact on budgets allocated at district and facility level was limited. The experience in Kilifi highlights the feasibility of engaging the community in the health planning process, and the challenges of ensuring that this engagement feeds into consolidated plans and future implementation. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  13. USDOT ATTRI program : international innovation coordination plan : final report.

    DOT National Transportation Integrated Search

    2016-12-01

    Transportation plays a critical role in enhancing access to education, jobs, healthcare, recreation, leisure, and other activities. The United States Department of Transportations (USDOTs) Accessible Transportation Technology Research Initiativ...

  14. Technology Partnership Organization: Quality Work Force Planning in East Texas. Final Report for Project Year 1990-1991.

    ERIC Educational Resources Information Center

    Fabac, John N.

    The Technology Partnership Organization (TPO) is one of 24 Quality Work Force Planning (QWFP) entities in Texas. The TPO met its objectives through a variety of activities, including the following: (1) establishing a QWFP committee for the region; (2) providing an inventory of key regional industries with the greatest job opening potential and…

  15. 77 FR 51044 - Laguna Cartagena National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... plants, haying, research studies, wildlife surveying and monitoring, scientific collections, and camping... interest, including West Indian whistling ducks and kestrels. Under this alternative, specific activities...

  16. 76 FR 54247 - Supawna Meadows National Wildlife Refuge, Salem County, NJ; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ..., New Jersey. In this final CCP, we describe how we will manage this refuge for the next 15 years..., and other wildlife. We would continue to actively manage tidal marsh and grassland habitats, and would... consideration would be to manage a diversity of other refuge wetland and upland habitats to benefit breeding and...

  17. Strategic planning in a complex academic environment: lessons from one academic health center.

    PubMed

    Levinson, Wendy; Axler, Helena

    2007-08-01

    Leaders in academic health centers (AHCs) must create a vision for their academic unit embedded in a complex environment. A formal strategic planning process can be valuable to help shape a clear vision taking advantage of potential collaborations and to develop specific achievable long- and short-term goals. The authors describe the steps in a formal strategic planning process and illustrate it with the example of the Department of Medicine at the University of Toronto Faculty of Medicine beginning in 2004. The process included the active participation of over 300 faculty members, trainees, and stakeholders of the department and resulted in broad-based support and leadership for the resulting plan. The authors describe the steps, which include getting started, committing to planning principles, establishing the work plan, understanding the environment, pulling it all together, shaping the vision, testing strategic directions, building effective implementation, and promoting the plan. Articulation of vision, mission, and values informed the plan's development, as well as 10 key principles integral to the plan. Challenges and lessons learned are also described. The final strategic plan is an active core activity of the department, guiding decisions and resource allocation and facilitating measurement of success or shortcomings. The process the authors describe is applicable to multiple academic units, including divisions/sections, departments, or thematic programs in AHCs.

  18. Federal Highway Administration research and technology evaluation final report : Eco-Logical

    DOT National Transportation Integrated Search

    2018-03-01

    This report documents an evaluation of Federal Highway Administrations (FHWA) Research and Technology Programs activities on the implementation of the Eco-Logical approach by State transportation departments and metropolitan planning organizati...

  19. Connecticut ITS/CVO business plan : final report

    DOT National Transportation Integrated Search

    1998-06-01

    This document describes: goals and objectives for Connecticut ITS/CVO deployment; current regulatory structure and activities; envisioned process changes enabled by ITS/CVO technologies; how motor carriers perceive the value of ITS/CVO services; bene...

  20. Develop a Business Plan

    DTIC Science & Technology

    1993-10-01

    AD-A274 321 ,’U IflIlllME• U I I DEVELOP A BUSINESS PLAN U FINAL REPORT n A Short Term Research and Development Task Proposed Under DLA900-87-D-0017...DATEU COVERED October 1, 1.993 F inal -10/12./89 Q 6󈧢/93 4. TITLE AND SUBTIILE S. FUNDING NUMBERS "Develop a Business Plan" DLA900-87-D-0017 D00017 I...Z39-16 Z9- 107 DEVELOP A BUSINESS PLAN I EXECUTIVE SUMMARY I Funding for CAR’s activities has come from a variety of sources: federal, state, Clemson

  1. PlanWorks: A Debugging Environment for Constraint Based Planning Systems

    NASA Technical Reports Server (NTRS)

    Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will

    2005-01-01

    Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

  2. 78 FR 35758 - Final Priority; National Institute on Disability and Rehabilitation Research-Rehabilitation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... focus its activities on the Federal-State vocational rehabilitation (VR) program and its mission of... focus their research activities on topics related to the Federal-State VR program, they are not required... implementation of the Plan, NIDRR seeks to improve the health and functioning, employment, and community living...

  3. State of the art evaluation of traffic detection and monitoring systems. Volume 1, Phases A & B : design [Final report

    DOT National Transportation Integrated Search

    2007-10-01

    This report covers the Phase A and B activities of Research Project SPR 627 for the Arizona Department of Transportation (ADOT). Phase C is planned as a separate research activity and is anticipated to begin in the near term, following the completion...

  4. New Directions in Library and Information Science Education. Final Report. Volume 2.6: Database Distributor/Service Professional Competencies.

    ERIC Educational Resources Information Center

    Griffiths, Jose-Marie; And Others

    This document contains validated activities and competencies needed by librarians working in a database distributor/service organization. The activities of professionals working in database distributor/service organizations are listed by function: Database Processing; Customer Support; System Administration; and Planning. The competencies are…

  5. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs - Pasadena testbed analysis plan : final report.

    DOT National Transportation Integrated Search

    2016-06-30

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  6. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  7. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1994 through November 30, 1995. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  8. Final consolidated action plan to Tiger Team. Volume 1, Change 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A thirdmore » purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less

  9. Final consolidated action plan to Tiger Team. Volume 2, Change 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficienciesmore » identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less

  10. A Longitudinal Study of Vocational Development and Program Evaluation. Implications for Curriculum Planning and Vocational Guidance. Final Report.

    ERIC Educational Resources Information Center

    Pennsylvania State Univ., University Park. Dept. of Vocational Education.

    The report is an accounting of activities of the Vocational Development Study (VDS) project during the three-year funding period of July 1971 to July 1974. The longitudinal study, planned to cover a 10-year span, was begun in the fall of 1968. The project was developed to identify the effects of the high school experience on youth in vocational…

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADAMS, WADE C

    The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys include gamma surface scans, gamma direct measurements, and soil sampling.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADAMS, WADE C

    The objectives of the confirmatory activities were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the contractor's procedures and FSS results. ORAU reviewed ABB CE's decommissioning plan, final status survey plan, and the applicable soil DCGLs, which were developed based on an NRC-approved radiation dose assessment. The surveys included gamma surface scans, gamma direct measurements, and soil sampling.

  13. 78 FR 76176 - Notice of Availability of the Record of Decision for the Final Trail Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ...] Notice of Availability of the Record of Decision for the Final Trail Management Plan/Environmental Impact... (ROD) for the Final Trail Management Plan/ Environmental Impact Statement (Plan/EIS), Cuyahoga Valley... 1, the no-action alternative, the trails, authorized uses, and facilities addressed in this Plan/EIS...

  14. Attitudes and exercise adherence: test of the Theories of Reasoned Action and Planned Behaviour.

    PubMed

    Smith, R A; Biddle, S J

    1999-04-01

    Three studies of exercise adherence and attitudes are reported that tested the Theory of Reasoned Action and the Theory of Planned Behaviour. In a prospective study of adherence to a private fitness club, structural equation modelling path analysis showed that attitudinal and social normative components of the Theory of Reasoned Action accounted for 13.1% of the variance in adherence 4 months later, although only social norm significantly predicted intention. In a second study, the Theory of Planned Behaviour was used to predict both physical activity and sedentary behaviour. Path analyses showed that attitude and perceived control, but not social norm, predicted total physical activity. Physical activity was predicted from intentions and control over sedentary behaviour. Finally, an intervention study with previously sedentary adults showed that intentions to be active measured at the start and end of a 10-week intervention were associated with the planned behaviour variables. A multivariate analysis of variance revealed no significant multivariate effects for time on the planned behaviour variables measured before and after intervention. Qualitative data provided evidence that participants had a positive experience on the intervention programme and supported the role of social normative factors in the adherence process.

  15. Final Decision Document for the Basin a Neck Groundwater Intercept and Treatment System Interim Response Action at the Rocky Mountain Arsenal.

    DTIC Science & Technology

    1989-02-01

    PLAN A Health and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan...Bicycloheptadiene BCHPD 0(2) Bromoform CHBR3 100(4) note: total trihalomethanes Cadmium CD 10(1) 5(3)* 10(4) I Carbon tetrachloride CCL4 0(3) 5(4) Chlordane CLDAN...comments, numerous carcinogenicity tests in a variety of animals indicate that aldrin and dieldrin promote only liver tumors and the tumors develop only

  16. Active travel behavior and spatial-temporal land use mixing : final report.

    DOT National Transportation Integrated Search

    2017-06-01

    Smart growth policies have often emphasized the importance of land use mix as an intervention beholding of lasting urban planning and public health benefits. Past transportation-land use research has identified potential efficiency gains achieved by ...

  17. 75 FR 53786 - Senior Community Service Employment Program; Final Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... the 2006 OAA, that the SCSEP is designed to ``[i]ncrease the number of persons who may enjoy the... State Plan is ``statewide.'' That is to say, it is designed to cover all program activities that will...

  18. Activated Sludge. Instructor's Guide. Biological Treatment Process Control.

    ERIC Educational Resources Information Center

    Boe, Owen K.

    This instructor's guide contains the materials needed to teach a seven-lesson unit on activated sludge. These materials include an overview of the unit, lesson plans, lecture outlines (keyed to slides designed for use with the lessons), student worksheets for each of the seven lessons (with answers), and two copies of a final quiz (with and…

  19. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs - San Mateo Testbed Analysis Plan : Final Report.

    DOT National Transportation Integrated Search

    2016-06-29

    The primary objective of this project is to develop multiple simulation testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  20. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adonizio, Mary Ann; Corren, Dean; Smith, Ron

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  1. TVA's photovoltaic activities

    NASA Astrophysics Data System (ADS)

    Chinery, G. T.; Wood, J. M.

    1985-08-01

    This paper describes the Tennessee Valley Authority's (TVA) current photovoltaic (PV) activities. These include four roof-mounted 4 kWp residential arrays (which are also Southeast Residential Station field sites) and two 5-6 kWp commercial sites, all grid connected with no battery storage. Also included are approximately 30 kWp of non-grid-connected remote sites with storage (remote lighting, weather stations, etc.). Monitoring results from the two 'online' residential systems are presented. Finally, TVA's future PV plans are discussed, both with respect to interfacing with a multitude of residential and commercial cogenerators and with regard to possible TVA PV central station plans.

  2. NASA Science Institutes Plan. Report of the NASA Science Institutes Team: Final Publication (Incorporating Public Comments and Revisions)

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This NASA Science Institute Plan has been produced in response to direction from the NASA Administrator for the benefit of NASA Senior Management, science enterprise leaders, and Center Directors. It is intended to provide a conceptual framework for organizing and planning the conduct of science in support of NASA's mission through the creation of a limited number of science Institutes. This plan is the product of the NASA Science Institute Planning Integration Team (see Figure A). The team worked intensively over a three-month period to review proposed Institutes and produce findings for NASA senior management. The team's activities included visits to current NASA Institutes and associated Centers, as well as approximately a dozen non-NASA research Institutes. In addition to producing this plan, the team published a "Benchmarks" report. The Benchmarks report provides a basis for comparing NASA's proposed activities with those sponsored by other national science agencies, and identifies best practices to be considered in the establishment of NASA Science Institutes. Throughout the team's activities, a Board of Advisors comprised of senior NASA officials (augmented as necessary with other government employees) provided overall advice and counsel.

  3. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  4. Cost and Schedule Analytical Techniques Development: Option 1

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1995 through November 30, 1996. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) and the Program Plans and Requirements Officer (PPO2). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  5. 77 FR 12877 - Record of Decision for the General Management Plan/Abbreviated Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Decision for the General Management Plan/Abbreviated Final Environmental Impact Statement for New River... Abbreviated Final Environmental Impact Statement for the General Management Plan for New River Gorge National... Record of Decision can be downloaded from the NPS Planning, Environment and Public Comment (PEPC) Web...

  6. Phase IV of Early Restoration | NOAA Gulf Spill Restoration

    Science.gov Websites

    Trustees published the Final Phase IV Early Restoration Plan and Environmental Assessments. The plan habitats. Useful Links: Final Phase IV Early Restoration Plan and Environmental Assessments (pdf, 4.8 MB ) Final Phase IV Early Restoration Plan and Environmental Assessments Executive Summary (pdf, 729 KB

  7. Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.

    PubMed

    2000-03-23

    This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage.

  8. 75 FR 57059 - Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N175; 61130-1115-0000 F2] Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and Final... Department of Natural Resources and Conservation (DNRC) a Final Habitat Conservation Plan (HCP) and prepared...

  9. Residential Sampling Report of Walter Coke Inc., Birmingham, Alabama, facility, December 2009

    EPA Pesticide Factsheets

    The field activities and results of the investigation in three residential neighborhoods – Collegeville, Fairmont, and Harriman Park. Performed in accordance with the EPA approved Residential Sampling Work Plan, final revision August 2008 (CH2M HILL, 2008)

  10. 40 CFR 70.4 - State program submittals and transition.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...

  11. 40 CFR 70.4 - State program submittals and transition.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...

  12. 40 CFR 70.4 - State program submittals and transition.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...

  13. Evaluation of RE-Powering America’s Land Initiative

    EPA Pesticide Factsheets

    In October 2014, the final version of the RE-Powering America’s Land Initiative (the “Initiative”) Action Plan 2.0, was released, articulating the goals and objectives of the Initiative and the activities it expected to pursue over the next two years.

  14. [Planning driven by health priorities. Master planning criteria].

    PubMed

    Tresserras, Ricard

    2008-12-01

    With the aim of responding to a number of problems detected in health plan evaluations, a new direction has been proposed in Catalonia which would lead to the improved unification of the strategic and operational approaches, and leadership. The master plans that tackle those health problems with the greatest impact were created along these lines. This article presents the most salient aspects of the master plans for oncology, circulatory diseases, mental health and addictions, immigration and the field of social healthcare. Their organisational structure, mission and functions are presented, commenting on the prioritisation of activities and the principal benchmark elements of the healthcare model in the definition of planning criteria for services incorporated into the Health Map. Finally, mention is made of the evaluation procedures. The in-depth study of priority settings has resulted in significant progress towards unifying health and service planning.

  15. RMA Abandoned Well Closure Program. Final Task Plan, Version 3.0.

    DTIC Science & Technology

    1989-05-01

    20503. 1 . AGENCY USE ONLY (Leave blank) 2. REPORT DATE" 0 3. REPORT TYPE AND DATES COVERED _T 05/00/89 __________________ 4. TITLE AND SUBTITLE S...AQUIFERS. THE SCOPE OF WORK INCLUDES: 1 . COMPILATION OF A WELL INVENTORY AND DATABASE 2. FIELD LOCATION OF WELLS 3. CLEANING AND CLOSURE OF...APPROXIMATELY 350 WELT- 4. DOCUMENTATION OF CLOSURE ACTIVITIES. SECTIONS OF THIS TASK PLAN DETAIL-INFORMATION ON: 1 . ABANDONED WELL IDENTIFICATION AND LOCATION

  16. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  17. The NASA L3 Study

    NASA Technical Reports Server (NTRS)

    Stebbins, Robin

    2016-01-01

    The Astrophysics Implementation Plan calls for a minority role in L3, planned for launch in 2034. L3 The third large mission in ESAs Cosmic Visions 2015-2025 Programme NASA and ESA have been discussing a collaboration for 2 years Gravitational Observatory Advisory Team (GOAT) ESA study evaluating and recommend scientific performance tradeoffs, detection technologies, technology development activities, data analysis capabilities, schedule and cost US representatives: Guido Mueller, Mark Kasevich, Bill Klipstein, RTS Started in October 2014, concluding with a final report in late Marchor early April 2016. ESA solicited interest from ESA Member States in November 2015 NASA is continuing technology development support. ESA is restarting technology development activities.

  18. Langley Research Center Strategic Plan for Education

    NASA Technical Reports Server (NTRS)

    Proctor, Sandra B.

    1994-01-01

    Research assignment centered on the preparation of final draft of the NASA Langley Strategic Plan for Education. Primary research activity consisted of data collection, through interviews with LaRC Office of Education and NASA Headquarters staff, university administrators and faculty, and school administrators / teachers; and documentary analysis. Pre-college and university programs were critically reviewed to assure effectiveness, support of NASA and Langley's mission and goals; National Education Goals; and educational reform strategies. In addition to these mandates, pre-college programs were reviewed to address present and future LaRC activities for teacher enhancement and preparation. University programs were reviewed with emphasis on student support and recruitment; faculty development and enhancement; and LaRC's role in promoting the utilization of educational technologies and distance learning. The LaRC Strategic Plan for Education will enable the Office of Education to provide a focused and well planned continuum of education programs for students, teachers and faculty. It will serve to direct and focus present activities and programs while simultaneously offering the flexibility to address new and emerging directions based on changing national, state, and agency trends.

  19. A survey of experiments and experimental facilities for active control of flexible structures

    NASA Technical Reports Server (NTRS)

    Sparks, Dean W., Jr.; Horner, Garnett C.; Juang, Jer-Nan; Klose, Gerhard

    1989-01-01

    A brief survey of large space structure control related experiments and facilities was presented. This survey covered experiments performed before and up to 1982, and those of the present period (1982-...). Finally, the future planned experiments and facilities in support of the control-structure interaction (CSI) program were reported. It was stated that new, improved ground test facilities are needed to verify the new CSI design techniques that will allow future space structures to perform planned NASA missions.

  20. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  1. Planning a Gender Fair as a Semester-Long Final Project

    ERIC Educational Resources Information Center

    Enck, Suzanne Marie

    2015-01-01

    This semester-long activity for a "Gender Fair" project helps undergraduate students gain an appreciation of gender as a social, historical, and cultural construction that is constituted intersectionally (with race-class-sexuality, at minimum) and fundamentally through communication practices. Specifically, upon completing this project,…

  2. Technology Education Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Appalachian Technology Education Consortium, Morgantown, WV.

    Year 1 of the Appalachian Technology Education Consortium Demonstration Project began with formation of an executive committee to serve as the managerial arm and establishment of a board of directors to determine policy direction. Other activities included planning for external evaluation, recruiting of demonstration and observer schools, and…

  3. Mission Possible: Basic Training for Fundraisers.

    ERIC Educational Resources Information Center

    Mabry, Vickie

    2000-01-01

    Provides steps for effective fundraising in Catholic Schools: (1) set a goal; (2) recruit a committee; (3) select a company; (4) final planning; (5) advance promotion and advertising, (6) countdown and logistics reconfirmation; (7) "all systems go" and kick-off activities; (8) product delivery; and (9) evaluation. (CW)

  4. Improving health sector travel.

    PubMed

    Hurdle, David; Davis, Adrian

    2004-10-01

    Preventing ill health and obesity and building more physical activity into our daily lives have never been so high on the agenda, and the way we travel can help. Many workplaces and schools are drawing up travel plans, with the aims usually to minimise car use and encourage healthier and more environmentally friendly travel. The Transport White Paper of 1998 advocated travel plans and singled out hospitals for action. Travel plans continue to be a focus within the latest Transport White Paper, launched in July 2004. This article covers various prompts to the health sector to implement travel plans. It addresses issues and concerns facing NHS Trusts, the practical things Trusts can do, and the increasing amount of good practice available. Finally, it demonstrates that travel plans can work, and are working, in the health sector.

  5. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  6. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Monocacy National Battlefield

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... DEPARTMENT OF THE INTERIOR National Park Service Final Environmental Impact Statement for the... Interior. ACTION: Notice of Availability of the Final Environmental Impact Statement for the General... Environmental Impact Statement for the General Management Plan for Monocacy National Battlefield. The plan will...

  7. 75 FR 36551 - State Highway-Rail Grade Crossing Action Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ...-0032; Notice No. 5] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Final rule. SUMMARY: This final... three years, to develop State highway-rail grade crossing action plans. The final rule addresses the...

  8. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0003-422] Coral Reef Restoration Plan... for the Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National... availability of a Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan (Plan...

  9. 77 FR 37432 - Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ...-FF03E00000] Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of... Springfield Plateau Regional Restoration Plan (Plan) and Environmental Assessment and Finding of No... Springfield Plateau Regional Restoration Plan and Environmental Assessment (77 FR 1717). The public comment...

  10. Information Resources Management Skills for Academic Librarians: Final Report.

    ERIC Educational Resources Information Center

    McClure, Charles R.; And Others

    This report summarizes activities conducted from fall 1984 through spring 1985, under a planning grant from the Council on Library Resources for Innovation and Improvement of Basic and Supplementary Education for Academic and Research Libraries. The report includes a review of selected literature related to educational programs for academic…

  11. 78 FR 5409 - Ongoing Equivalence Verifications of Foreign Food Regulatory Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... of data shared. Finally, with respect to POE re-inspections, NACMPI recommended the targeting of high-risk product and high-risk imports for sampling and other verification activities during reinspection... authority; the availability of contingency plans in the country for containing and mitigating the effects of...

  12. Development of a queue warning system utilizing ATM infrastructure system development and field-testing : final report.

    DOT National Transportation Integrated Search

    2017-06-13

    MnDOT has already deployed an extensive infrastructure for Active Traffic Management (ATM) on I-35W and I-94 with plans to expand on other segments of the Twin Cities freeway network. The ATM system includes intelligent lane control signals (ILCS) sp...

  13. Upgrading in an Industrial Setting. Final Report.

    ERIC Educational Resources Information Center

    Russell, Wendell

    The project objectives were: (1) to assess existing industrial upgrading practices in an Atomic Energy Commission contractor organization, (2) to design new alternative upgrading methods, (3) to experiment with new upgrading methods, (4) to plan for utilization of proven upgrading programs, and (5) to document and disseminate activities. A twelve…

  14. 77 FR 12107 - Reports, Forms and Recordkeeping Requirements; Agency Information Collection Activity Under OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ..., and transportation service providers to identify their specific plans, investment strategies, and perspectives concerning market trends, which are a critical part of the subject Study. Finally, the Maritime... (or will be developed) to address the potential impacts on their costs and routing strategies as a...

  15. Final report for the National Center for Intermodal Transportation for Economic Competitiveness : mission intermodal excellence.

    DOT National Transportation Integrated Search

    2014-12-01

    The main objective of this project is to continue educating K-12 students about intermodal transportation. In 2012, NCITEC funded our K-12 project which aimed to develop tools, such as, lesson plans and hands-on activities that would introduce K-12 s...

  16. Final Environmental Assessment for the Installation of a Range Safety Lighting System at Avon Park Air Force Range, Florida

    DTIC Science & Technology

    2010-08-01

    considered with other activities that require additional artificial night lighting. For instance, the development of the new town of Destiny planned...Mobarkey, M. Barak, A. Hoyzman, and O. Halevy, 2004. Monochromatic Light Stimuli During Embryogenesis Enhances Embryo Development and Posthatch

  17. Principles of health infrastructure planning in less developed countries.

    PubMed

    Unger, J P; Criel, B

    1995-01-01

    This article proposes a number of key principles for health infrastructure planning, based on a literature review on the one hand, and on a process of internal deduction on the other. The principles discussed are the following: an integrated health system; a thrifty planning of tiers within that health system; a specificity of tiers; a homogeneity of the tiers' structures; a minimum package of activities; a territorial responsibility and/or an explicit and discrete responsibility for a well-defined population; a necessary and sufficient population basis; a partial separation of administrative and public health planning bases; and, finally, rules for a geographical division and integration of non-governmental organizations. The definition of two strategies, primary health care and district health systems, is also revisited.

  18. Science Planning Implementation and Challenges for the ExoMars Trace Gas Orbiter

    NASA Astrophysics Data System (ADS)

    Ashman, Mike; Cardesin Moinelo, Alejandro; Frew, David; Garcia Beteta, Juan Jose; Geiger, Bernhard; Metcalfe, Leo; Muñoz, Michela; Nespoli, Federico

    2018-05-01

    The ExoMars Science Operations Centre (SOC) is located at ESA's European Space Astronomy Centre (ESAC) in Madrid, Spain and is responsible for coordinating the science planning activities for TGO in order to optimize the scientific return of the mission. The SOC constructs, in accordance with Science Working Team (SWT) science priorities, and in coordination with the PI science teams and ESA's Mission Operations Centre (MOC), a plan of scientific observations and delivers conflict free operational products for uplink and execution on-board. To achieve this, the SOC employs a planning concept based on Long, Medium and Short Term planning cycles. Long Term planning covers mission segments of several months and is conducted many months prior to execution. Its goal is to establish a feasible science observation strategy given the science priorities and the expected mission profile. Medium Term planning covers a 1 month mission segment and is conducted from 3 to 2 months prior to execution whilst Short Term planning covers a 1 week segment and is conducted from 2 weeks to 1 week prior to execution. The goals of Medium and Short Term planning are to operationally instantiate and validate the Long Term plan such that the SOC may deliver to MOC a conflict free spacecraft pointing profile request (a Medium Term planning deliverable), and the final instrument telecommanding products (a Short Term planning deliverable) such that the science plan is achieved and all operational constraints are met. With a 2 hour-400km science orbit, the vast number of solar occultation, nadir measurement, and surface imaging opportunities, combined with additional mission constraints such as the necessary provision of TGO communication slots to support the ExoMars 2020 Rover & Surface Platform mission and NASA surface assets, creates a science planning task of considerable magnitude and complexity. In this paper, we detail how the SOC is developing and implementing the necessary planning infrastructure, processes and automation in order to support science planning of this scale throughout the TGO mission. We also detail how the re-use and further development of ESA's multi-mission planning software tool is being implemented in order to provide the necessary additional functionality for the SOC's planning team to exploit, and to therefore ensure the optimum scientific return of the TGO mission. Finally, we provide an overview and status of the real science planning activities taking place in the first weeks of the nominal science phase in the first half of 2018.

  19. Public Participation, Education, and Engagement in Drought Planning

    NASA Astrophysics Data System (ADS)

    Bathke, D. J.; Wall, N.; Haigh, T.; Smith, K. H.; Bernadt, T.

    2014-12-01

    Drought is a complex problem that typically goes beyond the capacity, resources, and jurisdiction of any single person, program, organization, political boundary, or sector. Thus, by nature, monitoring, planning for, and reducing drought risk must be a collaborative process. The National Drought Mitigation Center, in partnership with the National Integrated Drought Information System (NIDIS) Program Office and others, provides active engagement and education drought professionals, stakeholders, and the general public about managing drought-related risks through resilience planning, monitoring, and education. Using case studies, we discuss recruitment processes, network building, participation techniques, and educational methods as they pertain to a variety of unique audiences with distinct objectives. Examples include collaborative decision-making at a World Meteorological Organization conference; planning, and peer-learning among drought professionals in a community of practice; drought condition monitoring through citizen science networks; research and education dissemination with stakeholder groups; and informal learning activities for all ages. Finally, we conclude with evaluation methods, indicators of success, and lessons learned for increasing the effectiveness of our programs in increasing drought resilience.

  20. Being accountable for care of the poor. CHA's social accountability budget helps facilities keep track of charitable activity.

    PubMed

    Trocchio, J; Eckels, T

    1989-06-01

    The Catholic Health Association's social accountability budget is a set of tools to help Catholic healthcare facilities plan for, administer, and report benefits provided to their communities, especially the poor. It defines a full roster of community benefits that a healthcare organization may provide. The benefits fall into three major categories: activities and services, policies and procedures, and community leadership. The social accountability budget also presents guidelines for assessing the facility's existing services, activities, policies, and procedures and discusses how the facility can conduct or be part of a community needs assessment. Information collected through this assessment is used in the planning and budgeting processes. This ensures that uncompensated care and charitable services receive consideration along with traditional planning and budgeting items. Additional guidelines show the facility how to track and measure its services to the community. The final step, often absent from Catholic healthcare facilities' programs, is reporting community benefits.

  1. 77 FR 52054 - Notice of Availability of the Proposed Bakersfield Resource Management Plan and Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAC06000.L16100000.DQ0000.LXSS095B0000] Notice of Availability of the Proposed Bakersfield Resource Management Plan and Final Environmental... prepared the Proposed Resource Management Plan (RMP) and Final Environmental Impact Statement (EIS) for the...

  2. Effect of the Family and Medical Leave Act on the operation of cafeteria plans. Final regulations.

    PubMed

    2001-10-17

    This document contains final regulations relating to cafeteria plans that reflect changes made by the Family and Medical Leave Act of 1993 (Act). The final regulations provide the public with guidance needed to comply with the Act and affect employees who participate in cafeteria plans.

  3. Numerical aerodynamic simulation program long haul communications prototype

    NASA Technical Reports Server (NTRS)

    Cmaylo, Bohden K.; Foo, Lee

    1987-01-01

    This document is a report of the Numerical Aerodynamic Simulation (NAS) Long Haul Communications Prototype (LHCP). It describes the accomplishments of the LHCP group, presents the results from all LHCP experiments and testing activities, makes recommendations for present and future LHCP activities, and evaluates the remote workstation accesses from Langley Research Center, Lewis Research Center, and Colorado State University to Ames Research Center. The report is the final effort of the Long Haul (Wideband) Communications Prototype Plan (PT-1133-02-N00), 3 October 1985, which defined the requirements for the development, test, and operation of the LHCP network and was the plan used to evaluate the remote user bandwidth requirements for the Numerical Aerodynamic Simulation Processing System Network.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mauro, R.; Leach, S.

    This paper summarizes current and planned activities in the areas of hydrogen production and use, near-term venture opportunities, and codes and standards. The rationale for these efforts is to assess industry interest and engage in activities that move hydrogen technologies down the path to commercialization. Some of the work presented in this document is a condensed, preliminary version of reports being prepared under the DOE/NREL contract. In addition, the NHA work funded by Westinghouse Savannah River Corporation (WSRC) to explore the opportunities and industry interest in a Hydrogen Research Center is briefly described. Finally, the planned support of and industrymore » input to the Hydrogen Technical Advisory Panel (HTAP) on hydrogen demonstration projects is discussed.« less

  5. 78 FR 44592 - Final General Management Plan, Final Wilderness Study, and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... General Management Plan and Wilderness Study (Final EIS/GMP/WS) for Fort Pulaski National Monument... national monument, the Final EIS/GMP/WS will guide the management of the national monument over the next 20... publication of the Environmental Protection Agency's Notice of Availability of the Final EIS/GMP/WS in the...

  6. 78 FR 21245 - Continuity of Operations Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  7. Overview of design and analysis activities for the W7-X scraper element

    DOE PAGES

    Lumsdaine, A.; Bjorholm, T.; Harris, J.; ...

    2016-08-18

    The Wendelstein 7-X stellarator is in final stages of commissioning, and will begin operation in late 2015. In the first phase, the machine will operate with a limiter, and will be restricted to low power and short pulse. But in 2019, plans are for an actively cooled divertor to be installed, and the machine will operate in steady state at full power. Recently, plasma simulations have indicated that, in this final operational phase, a bootstrap current will evolve in certain scenarios. This will cause the sensitive ends of the divertor target to be overloaded beyond their qualified limit. A highmore » heat flux scraper element (HHF-SE) has been proposed in order to take up some of the convective flux and reduce the load on the divertor. In order to examine whether the HHF-SE will be able to effectively reduce the plasma flux in the divertor region of concern, and to determine how the pumping effectiveness will be affected by such a component, it is planned to include a test divertor unit scraper element (TDU-SE) in 2017 during an earlier operational phase. Several U.S. fusion energy science laboratories have been involved in the design, analysis (structural and thermal finite element, as well as computational fluid dynamics), plasma simulation, planning, prototyping, and diagnostic development around the scraper element program (both TDU-SE and HHF-SE). As a result, this paper presents an overview of all of these activities and their current status.« less

  8. 45 CFR 1386.36 - Final disapproval of the State plan or plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON DEVELOPMENTAL DISABILITIES, DEVELOPMENTAL DISABILITIES PROGRAM FORMULA GRANT PROGRAMS Federal Assistance to State Developmental Disabilities Councils § 1386.36 Final disapproval of the State plan or plan...

  9. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    PubMed

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  10. Downgrade of the Savannah River Sites FB-Line

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SADOWSKI, ED; YOURCHAK, RANDY; PRETZELLO MARJI

    2005-07-05

    This paper will discuss the Safeguards & Security (S&S) activities that resulted in the downgrade of the Savannah River Site's FB-Line (FBL) from a Category I Material Balance Area (MBA) in a Material Access Area (MAA) to a Category IV MBA in a Property Protection Area (PPA). The Safeguards activities included measurement of final product items, transferal of nuclear material to other Savannah River Site (SRS) facilities, discard of excess nuclear material items, and final measurements of holdup material. The Security activities included relocation and destruction of classified documents and repositories, decertification of a classified computer, access control changes, updatesmore » to planning documents, deactivation and removal of security systems, Human Reliability Program (HRP) removals, and information security training for personnel that will remain in the FBL PPA.« less

  11. 26 CFR 1.401(a)(5)-1 - Special rules relating to nondiscrimination requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... compensation for A's final 5 plan years is as follows: 1995 plan year $10,500 1994 plan year $20,000 1993 plan... this section, an employee's final pay from the employer as of a plan year is the employee's compensation (as defined in section 414(q)(7)) for the year (ending with or within the 5-plan-year period...

  12. Medicare program; prohibition of midyear benefit enhancements for Medicare Advantage organizations. Final rule.

    PubMed

    2008-07-28

    This final rule prohibits Medicare Advantage (MA) organizations, including organizations offering MA plans to employer and union group health plan sponsors, from making midyear changes to nonprescription drug benefits, premiums, and cost-sharing submitted in their approved bids for a given contract year. This final rule also clarifies that MA organizations offering certain kinds of plans restricted to employer and union group health plan sponsors and not open to general enrollment may continue to offer benefit enhancements as they do currently, through means other than midyear benefit enhancements (MYBEs). Programs of all-inclusive care for elderly (PACE) are not subject to the provisions of this final rule and may continue to offer enhanced benefits as specified in our guidance for PACE plans.

  13. AutoLock: a semiautomated system for radiotherapy treatment plan quality control

    PubMed Central

    Lowe, Matthew; Hardy, Mark J.; Boylan, Christopher J.; Whitehurst, Philip; Rowbottom, Carl G.

    2015-01-01

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock. PACS number: 87.55.Qr PMID:26103498

  14. AutoLock: a semiautomated system for radiotherapy treatment plan quality control.

    PubMed

    Dewhurst, Joseph M; Lowe, Matthew; Hardy, Mark J; Boylan, Christopher J; Whitehurst, Philip; Rowbottom, Carl G

    2015-05-08

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock.

  15. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  16. 77 FR 26474 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Approval of 2011 Consent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ...EPA proposes to approve State Implementation Plan (SIP) revisions submitted by the Maryland Department of the Environment (MDE). These revisions approve specific provisions of a 2011 Consent Decree between MDE and GenOn to reduce particulate matter (PM), sulfur oxides (SOX), and nitrogen oxides (NOX) from the GenOn Chalk Point generating station (Chalk Point). These revisions also remove the 1978 and 1979 Consent Orders for the Chalk Point generating station from the Maryland SIP as those Consent Orders have been superseded by the 2011 Consent Decree. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.

  17. Planning a Tech Prep Program in Hospitality. Final Report.

    ERIC Educational Resources Information Center

    Chicago City Colleges, IL. Chicago City-Wide Coll.

    A project conducted to establish tech prep articulation training agreements between City Colleges of Chicago and several public secondary schools is described in this report. Project activities were as follows: (1) developed a handbook to define the tech prep experience and guide committee members on how tech prep can be a valuable asset to…

  18. 77 FR 29884 - Assessment of Fees on Large Bank Holding Companies and Nonbank Financial Companies Supervised by...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... the development of policies, procedures, rules, and regulations and other planning activities of the... holding companies and foreign banking organizations; the interim final rule applies to nonbank financial... determination date. Foreign banking organizations that have eligible assets of $50 billion or more will be...

  19. College and Careers Project, 1993-96. Final Report.

    ERIC Educational Resources Information Center

    Fixman, Carol S.

    The College and Careers Project sought to increase college attendance of at-risk students in the Philadelphia public high schools and to help students link their college and career planning. Over a three-year period, 48 students from 4 high schools participated. Students took part in college preparatory and career awareness activities throughout…

  20. Final Evaluation Report for Minneapolis Health and Nutrition Project.

    ERIC Educational Resources Information Center

    Guardian Resource Development, Inc., St. Paul, Minn.

    The social, mental and physical health of children in target Minneapolis Schools has been carefully studied. The intent of this project was to design and implement a program which would improve health. This report discusses the progress of the project for the first year. The project's activities centered around planning, needs assessment and…

  1. Final Report and Recommendations to Secretary Cobey from The Environmental Education Team.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Environment, Health, and Natural Resources, Raleigh.

    This report discusses the effectiveness of current educational efforts in the state of North Carolina, identifies opportunities for new or expanded activity, and recommends a plan of action. The first section discusses the definition of environmental education and reasons why environmental education is needed. The second section discusses three…

  2. Draft Final Decision Document for the North Boundary System Improvements Interim Response Action at the Rocky Mountain Arsenal

    DTIC Science & Technology

    1989-04-01

    and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan addresses...totaltriThelomethanes radmiutm CD 10(1) 5 .13)* 10(4 Larbon tetrachloride CCL4 0(3)5.4 ’tordane CDN0.004(l) 0.00046(5) CLI3oride CL 250,000(l...numerous carcinogenicity tests in a variety of animals indicate that dieldrin promotes only liver tumors and the tumors develop only in mice. On the basis of

  3. Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowsell, David Leon

    This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

  4. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan Section 13.6.3, Revision 1 on Physical Security--Early... NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.3, Revision 1 on Physical Security...

  5. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan Section 13.6.2, Revision 1 on Physical Security--Design... issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.2, Revision 1 on Physical Security--Design Certification...

  6. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan, Section 13.6.1, Revision 1 on Physical Security... Availability. SUMMARY: The NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.1, Revision 1 on...

  7. Space physics strategy: Implementation study. Volume 2: Program plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    In June, 1989, the Space Science and Applications Advisory Committee (SSAAC) authorized its Space Physics Subcommittee (SPS) to prepare a plan specifying the future missions, launch sequence, and encompassing themes of the Space Physics Division. The plan, now complete, is the product of a year-long study comprising two week-long workshops - in January and June 1990 - assisted by pre-workshop, inter-workshop, and post-workshop preparation and assessment activities. The workshops engaged about seventy participants, drawn equally from the Division's four science disciplines: cosmic and heliospheric physics, solar physics, magnetosphere physics, and ionosphere-thermosphere-mesospheric physics. An earlier report records the outcome of the first workshop; this is the report of the final workshop.

  8. Arizona Air Quality State Implementation Plans; Final Approval; Douglas, Arizona; Second 10-Year Sulfur Dioxide Maintenance Plan

    EPA Pesticide Factsheets

    EPA is taking final rulemaking action to approve, as part of the State Implementation Plan (SIP) for the State of Arizona, the second 10-year maintenance plan for the Douglas maintenance area for the 1971 National Ambient Air Quality Standards for SO2.

  9. Improved Virtual Planning for Bimaxillary Orthognathic Surgery.

    PubMed

    Hatamleh, Muhanad; Turner, Catherine; Bhamrah, Gurprit; Mack, Gavin; Osher, Jonas

    2016-09-01

    Conventional model surgery planning for bimaxillary orthognathic surgery can be laborious, time-consuming and may contain potential errors; hence three-dimensional (3D) virtual orthognathic planning has been proven to be an efficient, reliable, and cost-effective alternative. In this report, the 3D planning is described for a patient presenting with a Class III incisor relationship on a Skeletal III base with pan facial asymmetry complicated by reverse overjet and anterior open bite. A combined scan data of direct cone beam computer tomography and indirect dental scan were used in the planning. Additionally, a new method of establishing optimum intercuspation by scanning dental casts in final occlusion and positioning it to the composite-scans model was shown. Furthermore, conventional model surgery planning was carried out following in-house protocol. Intermediate and final intermaxillary splints were produced following the conventional method and 3D printing. Three-dimensional planning showed great accuracy and treatment outcome and reduced laboratory time in comparison with the conventional method. Establishing the final dental occlusion on casts and integrating it in final 3D planning enabled us to achieve the best possible intercuspation.

  10. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  11. Remote Sensing of Landuse Changes and Implications for Landuse Policy

    NASA Technical Reports Server (NTRS)

    Kennedy, Ken

    1996-01-01

    This final report describes grant activities under which students were to study landuse changes by comparing planning and zoning documents using remote sensed data data analyzed and interpreted in the laboratory. Students were recruited through mathematics, political science and engineering classes an clubs. Work protocols were then organized for research on the county's growth patterns over the last three decades. Students and investigators made planes to identify specific scenes in Landsat and other data which would satisfy the research parameters. Finally, statistical and imaging software was identified and some was acquired.

  12. Final rules relating to use of electronic communication and recordkeeping technologies by employee pension and welfare benefit plans. Notice of final rulemaking.

    PubMed

    2002-04-09

    This document contains final rules under Title I of the Employee Retirement Income Security Act of 1974, as amended (ERISA), concerning the disclosure of certain employee benefit plan information through electronic media, and the maintenance and retention of employee benefit plan records in electronic form. The rules establish a safe harbor pursuant to which all pension and welfare benefit plans covered by Title I of ERISA may use electronic media to satisfy disclosure obligations under Title I of ERISA. The rules also provide standards concerning the use of electronic media in the maintenance and retention of records required by sections 107 and 209 of ERISA. The rules affect employee pension and welfare benefit plans, including group health plans, plan sponsors, administrators and fiduciaries, and plan participants and beneficiaries.

  13. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel inmore » dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.« less

  14. Seattle To Portland Inter-City ITS Corridor Study And Communications Plan, Final Report

    DOT National Transportation Integrated Search

    1996-03-01

    THIS DOCUMENT IS THE FINAL REPORT PRESENTING THE SEATTLE TO PORTLAND INTELLIGENT TRANSPORTATION SYSTEM (ITS) EARLY DEPLOYMENT PLAN. THE FINAL REPORT SYNTHESIZES INFORMATION FROM TECHNICAL MEMORANDUMS 1 THROUGH 5; INCLUDING EXISTING AND FUTURE CONDITI...

  15. An optimization design for evacuation planning based on fuzzy credibility theory and genetic algorithm

    NASA Astrophysics Data System (ADS)

    Zhang, D.; Zhang, W. Y.

    2017-08-01

    Evacuation planning is an important activity in disaster management. It has to be planned in advance due to the unpredictable occurrence of disasters. It is necessary that the evacuation plans are as close as possible to the real evacuation work. However, the evacuation plan is extremely challenging because of the inherent uncertainty of the required information. There is a kind of vehicle routing problem based on the public traffic evacuation. In this paper, the demand for each evacuation set point is a fuzzy number, and each routing selection of the point is based on the fuzzy credibility preference index. This paper proposes an approximate optimal solution for this problem by the genetic algorithm based on the fuzzy reliability theory. Finally, the algorithm is applied to an optimization model, and the experiment result shows that the algorithm is effective.

  16. Career planning and development for nurses: the time has come.

    PubMed

    Donner, G J; Wheeler, M M

    2001-06-01

    Developments in how the nursing profession is perceived by nurses and by society, along with unparalleled changes in health care systems, have created an environment in which individual nurses must take control of their careers and futures. Educators, employers and professional organizations also have a key role to play in fostering the career planning and development of nurses, usually the largest employee group in most health care organizations. This article provides an overview of what career planning and development is and why it is important for nurses. A career planning and development model is described that provides nurses with a focused strategy to take greater responsibility for engaging in the ongoing planning process that is crucial throughout the major stages of their career. Finally, educators, employers and professional organizations are challenged to collaborate with individual nurses on career-development activities that will enable nurses to continue to provide high-quality care in ever-changing health care systems.

  17. Amendment to the interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Amendment to interim final rules with request for comments.

    PubMed

    2010-11-17

    This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  18. Excavated Soils Management Plan for AOCs 44 and 52, Fort Devens

    DTIC Science & Technology

    1994-05-01

    I FORT DEVENS AOCs 44 AND 52 I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN DATA ITEM A009I I U 20070424310 I CONTRACT DAAA15-91-D-0008 I U.S. ARMY...obselete FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS Prepared for. U.S. Army Enviromnental Center Aberdeen Proving Ground, Maryland...BLANK 3 I I I I I I I I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS TABLE OF CONTENTS 1 Section Title Page No. 1.0

  19. 78 FR 34918 - Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Environmental Management (IDEM) submitted the State Plan on February 27, 2013. The State Plan is consistent with... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9821-1] Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY...

  20. National Institute on Disability and Rehabilitation Research--Notice of Final Long-Range Plan for Fiscal Years 2005-2009. Federal Register, Part III: Department of Education

    ERIC Educational Resources Information Center

    National Archives and Records Administration, 2006

    2006-01-01

    The Assistant Secretary for Special Education and Rehabilitative Services (OSERS) publishes the Final Long-Range Plan (Final Plan) for the National Institute on Disability and Rehabilitation Research (NIDRR) for FY 2005 through 2009. As required by the Rehabilitation Act of 1973, as amended (Act), the Assistant Secretary takes this action to…

  1. Climate Change and Aquatic Invasive Species (Final Report) ...

    EPA Pesticide Factsheets

    EPA announced the availability of the final report, Climate Change and Aquatic Invasive Species. This report reviews available literature on climate-change effects on aquatic invasive species (AIS) and examines state-level AIS management activities. Data on management activities came from publicly available information, was analyzed with respect to climate-change effects, and was reviewed by managers. This report also analyzes state and regional AIS management plans to determine their capacity to incorporate information on changing conditions generally, and climate change specifically. The report is intended for managers and scientists working with AIS to provide them with information on the potential effects of climate change on AIS, strategies for adapting their management to accomodate these environmental changes, and highlight further research needs and gaps.

  2. Technology in education: A guidebook for developing a science and math education support program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, C.L.

    1992-09-01

    Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization's strengths and resources with the needs of the school system. Following these getting started'' activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less

  3. Technology in education: A guidebook for developing a science and math education support program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, C.L.

    1992-09-01

    Education is vital to survival and success in an increasingly technical world, and the quality of education is the responsibility of everyone students, teachers, parents, industry, and government. Any technical organization wanting to contribute to that success through its local education system can do so easily and effectively through careful planning. This report details that planning process and includes methods to (1) identify the interests, strengths, and resources of the technical organization; (2) identify the needs of the local education system; (3) interface with local school system administration, principals, and teachers; and (4) develop a unique plan to match themore » organization`s strengths and resources with the needs of the school system. Following these ``getting started`` activities is the actual program that the Engineering Technology Division implemented in a local elementary school, including the curriculum, topics, and actual lesson plans used by technical personnel in the classroom. Finally, there are enrichment activities for teachers and students, suggestions for measuring the success of an education support program, and an overview of student responses to questions about the overall program.« less

  4. Kindergarten through 12th Grade Project in Career Development and Bridging the Gap Between School and Work: Final Report.

    ERIC Educational Resources Information Center

    Watertown Independent School District 1, SD.

    Divided into four phases, this project in career education includes the following aspects: planning of project policies and activities and securing resource materials; orientation of the school district staff to the project; integration of occupational information, exploration, and career education concepts into the curriculum, identification of…

  5. Project Volunteer Power: Volunteers Serving the Job Needs of the Handicapped. Final Report.

    ERIC Educational Resources Information Center

    President's Committee on Employment of the Handicapped, Washington, DC.

    The report covers the activities, results, and lessons learned in a project to test a new approach in developing greater opportunities in employment of the physically handicapped, mentally retarded, and mentally restored by harnessing the resources of leading volunteer women's organizations at the local level on a practical, planned basis. Project…

  6. Urban Options Solar Greenhouse Demonstration Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  7. Report of Activities and Accomplishments: March 1, 1968 to February 28, 1969. Final Report.

    ERIC Educational Resources Information Center

    Green, Thomas F.; And Others

    From 1968 to 1969 the EPRC focused on: staff development, definition of a specific research program, and development of methods to deal with educational policy issues in the context of longrange futures. The research program of the center is organized around educational futures and policy planning. Specific methods include Delphi techniques, goal…

  8. Embedding ecosystem services in coastal planning leads to better outcomes for people and nature

    PubMed Central

    Arkema, Katie K.; Verutes, Gregory M.; Wood, Spencer A.; Clarke-Samuels, Chantalle; Rosado, Samir; Canto, Maritza; Rosenthal, Amy; Ruckelshaus, Mary; Guannel, Gregory; Toft, Jodie; Faries, Joe; Silver, Jessica M.; Griffin, Robert; Guerry, Anne D.

    2015-01-01

    Recent calls for ocean planning envision informed management of social and ecological systems to sustain delivery of ecosystem services to people. However, until now, no coastal and marine planning process has applied an ecosystem-services framework to understand how human activities affect the flow of benefits, to create scenarios, and to design a management plan. We developed models that quantify services provided by corals, mangroves, and seagrasses. We used these models within an extensive engagement process to design a national spatial plan for Belize’s coastal zone. Through iteration of modeling and stakeholder engagement, we developed a preferred plan, currently under formal consideration by the Belizean government. Our results suggest that the preferred plan will lead to greater returns from coastal protection and tourism than outcomes from scenarios oriented toward achieving either conservation or development goals. The plan will also reduce impacts to coastal habitat and increase revenues from lobster fishing relative to current management. By accounting for spatial variation in the impacts of coastal and ocean activities on benefits that ecosystems provide to people, our models allowed stakeholders and policymakers to refine zones of human use. The final version of the preferred plan improved expected coastal protection by >25% and more than doubled the revenue from fishing, compared with earlier versions based on stakeholder preferences alone. Including outcomes in terms of ecosystem-service supply and value allowed for explicit consideration of multiple benefits from oceans and coasts that typically are evaluated separately in management decisions. PMID:26082545

  9. Embedding ecosystem services in coastal planning leads to better outcomes for people and nature.

    PubMed

    Arkema, Katie K; Verutes, Gregory M; Wood, Spencer A; Clarke-Samuels, Chantalle; Rosado, Samir; Canto, Maritza; Rosenthal, Amy; Ruckelshaus, Mary; Guannel, Gregory; Toft, Jodie; Faries, Joe; Silver, Jessica M; Griffin, Robert; Guerry, Anne D

    2015-06-16

    Recent calls for ocean planning envision informed management of social and ecological systems to sustain delivery of ecosystem services to people. However, until now, no coastal and marine planning process has applied an ecosystem-services framework to understand how human activities affect the flow of benefits, to create scenarios, and to design a management plan. We developed models that quantify services provided by corals, mangroves, and seagrasses. We used these models within an extensive engagement process to design a national spatial plan for Belize's coastal zone. Through iteration of modeling and stakeholder engagement, we developed a preferred plan, currently under formal consideration by the Belizean government. Our results suggest that the preferred plan will lead to greater returns from coastal protection and tourism than outcomes from scenarios oriented toward achieving either conservation or development goals. The plan will also reduce impacts to coastal habitat and increase revenues from lobster fishing relative to current management. By accounting for spatial variation in the impacts of coastal and ocean activities on benefits that ecosystems provide to people, our models allowed stakeholders and policymakers to refine zones of human use. The final version of the preferred plan improved expected coastal protection by >25% and more than doubled the revenue from fishing, compared with earlier versions based on stakeholder preferences alone. Including outcomes in terms of ecosystem-service supply and value allowed for explicit consideration of multiple benefits from oceans and coasts that typically are evaluated separately in management decisions.

  10. Hiilangaay Hydroelectric Project – Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twitchell, Sara; Stimac, Michael; Lang, Lisa

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less

  11. Supporting evaluation for the proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwatermore » Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).« less

  12. 76 FR 48006 - Limited Federal Implementation Plan; Prevention of Significant Deterioration; California; North...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ... Implementation Plan; Prevention of Significant Deterioration; California; North Coast Unified Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing a limited Federal Implementation Plan (FIP) for the North Coast Unified Air Quality Management...

  13. 29 CFR 1952.313 - Final approval determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 1902. Accordingly, the Hawaii plan was granted final approval and concurrent Federal enforcement... employment in Hawaii. The plan does not cover maritime employment in the private sector; Federal government... effective as operations under the Federal program; to submit plan supplements in accordance with 29 CFR part...

  14. 29 CFR 1952.294 - Final approval determination.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...

  15. 29 CFR 1952.294 - Final approval determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...

  16. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  17. Comparison of treatment plans: a retrospective study by the method of radiobiological evaluation

    NASA Astrophysics Data System (ADS)

    Puzhakkal, Niyas; Kallikuzhiyil Kochunny, Abdullah; Manthala Padannayil, Noufal; Singh, Navin; Elavan Chalil, Jumanath; Kulangarakath Umer, Jamshad

    2016-09-01

    There are many situations in radiotherapy where multiple treatment plans need to be compared for selection of an optimal plan. In this study we performed the radiobiological method of plan evaluation to verify the treatment plan comparison procedure of our clinical practice. We estimated and correlated various radiobiological dose indices with physical dose metrics for a total of 30 patients representing typical cases of head and neck, prostate and brain tumors. Three sets of plans along with a clinically approved plan (final plan) treated by either Intensity Modulated Radiation Therapy (IMRT) or Rapid Arc (RA) techniques were considered. The study yielded improved target coverage for final plans, however, no appreciable differences in doses and the complication probabilities of organs at risk were noticed. Even though all four plans showed adequate dose distributions, from dosimetric point of view, the final plan had more acceptable dose distribution. The estimated biological outcome and dose volume histogram data showed least differences between plans for IMRT when compared to RA. Our retrospective study based on 120 plans, validated the radiobiological method of plan evaluation. The tumor cure or normal tissue complication probabilities were found to be correlated with the corresponding physical dose indices.

  18. Unconventional Tools for an Unconventional Resource: Community and Landscape Planning for Shale in the Marcellus Region

    NASA Astrophysics Data System (ADS)

    Murtha, T., Jr.; Orland, B.; Goldberg, L.; Hammond, R.

    2014-12-01

    Deep shale natural gas deposits made accessible by new technologies are quickly becoming a considerable share of North America's energy portfolio. Unlike traditional deposits and extraction footprints, shale gas offers dispersed and complex landscape and community challenges. These challenges are both cultural and environmental. This paper describes the development and application of creative geospatial tools as a means to engage communities along the northern tier counties of Pennsylvania, experiencing Marcellus shale drilling in design and planning. Uniquely combining physical landscape models with predictive models of exploration activities, including drilling, pipeline construction and road reconstruction, the tools quantify the potential impacts of drilling activities for communities and landscapes in the commonwealth of Pennsylvania. Dividing the state into 9836 watershed sub-basins, we first describe the current state of Marcellus related activities through 2014. We then describe and report the results of three scaled predictive models designed to investigate probable sub-basins where future activities will be focused. Finally, the core of the paper reports on the second level of tools we have now developed to engage communities in planning for unconventional gas extraction in Pennsylvania. Using a geodesign approach we are working with communities to transfer information for comprehensive landscape planning and informed decision making. These tools not only quantify physical landscape impacts, but also quantify potential visual, aesthetic and cultural resource implications.

  19. Robotic-Arm Assisted Total Knee Arthroplasty Demonstrated Greater Accuracy and Precision to Plan Compared with Manual Techniques.

    PubMed

    Hampp, Emily L; Chughtai, Morad; Scholl, Laura Y; Sodhi, Nipun; Bhowmik-Stoker, Manoshi; Jacofsky, David J; Mont, Michael A

    2018-05-01

    This study determined if robotic-arm assisted total knee arthroplasty (RATKA) allows for more accurate and precise bone cuts and component position to plan compared with manual total knee arthroplasty (MTKA). Specifically, we assessed the following: (1) final bone cuts, (2) final component position, and (3) a potential learning curve for RATKA. On six cadaver specimens (12 knees), a MTKA and RATKA were performed on the left and right knees, respectively. Bone-cut and final-component positioning errors relative to preoperative plans were compared. Median errors and standard deviations (SDs) in the sagittal, coronal, and axial planes were compared. Median values of the absolute deviation from plan defined the accuracy to plan. SDs described the precision to plan. RATKA bone cuts were as or more accurate to plan based on nominal median values in 11 out of 12 measurements. RATKA bone cuts were more precise to plan in 8 out of 12 measurements ( p  ≤ 0.05). RATKA final component positions were as or more accurate to plan based on median values in five out of five measurements. RATKA final component positions were more precise to plan in four out of five measurements ( p  ≤ 0.05). Stacked error results from all cuts and implant positions for each specimen in procedural order showed that RATKA error was less than MTKA error. Although this study analyzed a small number of cadaver specimens, there were clear differences that separated these two groups. When compared with MTKA, RATKA demonstrated more accurate and precise bone cuts and implant positioning to plan. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  20. Mission Operations Planning with Preferences: An Empirical Study

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Khatib, Lina; McGann, Conor

    2006-01-01

    This paper presents an empirical study of some nonexhaustive approaches to optimizing preferences within the context of constraint-based, mixed-initiative planning for mission operations. This work is motivated by the experience of deploying and operating the MAPGEN (Mixed-initiative Activity Plan GENerator) system for the Mars Exploration Rover Mission. Responsiveness to the user is one of the important requirements for MAPGEN, hence, the additional computation time needed to optimize preferences must be kept within reasonabble bounds. This was the primary motivation for studying non-exhaustive optimization approaches. The specific goals of rhe empirical study are to assess the impact on solution quality of two greedy heuristics used in MAPGEN and to assess the improvement gained by applying a linear programming optimization technique to the final solution.

  1. 75 FR 34669 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland for Transportation Conformity Regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final...

  2. Amendments to Summary Plan Description regulations. Pension and Welfare Benefits Administration, Labor. Final rule.

    PubMed

    2000-11-21

    This document contains a final rule amending the regulations governing the content of the Summary Plan Description (SPD) required to be furnished to employee benefit plan participants and beneficiaries under the Employee Retirement Income Security Act of 1974, as amended (ERISA). These amendments implement information disclosure recommendations of the President's Advisory Commission on Consumer Protection and Quality in the Health Care Industry, as set forth in their November 20, 1997, report, "Consumer Bill of Rights and Responsibilities." Specifically, the amendments clarify benefit, medical provider, and other information required to be disclosed in, or as part of, the SPD of a group health plan and repeal the limited exemption with respect to SPDs of welfare plans providing benefits through qualified health maintenance organizations (HMOs). In addition, this document contains several amendments updating and clarifying provisions relating to the content of SPDs that affect both pension and welfare benefit plans. This document also adopts in final form certain regulations that were effective on an interim basis implementing amendments to ERISA enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA). This final rule will affect employee pension and welfare benefit plans, including group health plans, as well as administrators, fiduciaries, participants and beneficiaries of such plans.

  3. Claims Procedure for Plans Providing Disability Benefits. Final rule.

    PubMed

    2016-12-19

    This document contains a final regulation revising the claims procedure regulations under the Employee Retirement Income Security Act of 1974 (ERISA) for employee benefit plans providing disability benefits. The final rule revises and strengthens the current rules primarily by adopting certain procedural protections and safeguards for disability benefit claims that are currently applicable to claims for group health benefits pursuant to the Affordable Care Act. This rule affects plan administrators and participants and beneficiaries of plans providing disability benefits, and others who assist in the provision of these benefits, such as third-party benefits administrators and other service providers.

  4. Support to LANL: Cost estimation. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOEmore » planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors.« less

  5. National Ignition Facility: Experimental plan

    NASA Astrophysics Data System (ADS)

    1994-05-01

    As part of the Conceptual Design Report (CDR) for the National Ignition Facility (NIF), scientists from Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), the University of Rochester's Laboratory for Laser Energetics (UR/LLE), and EG&G formed an NIF Target Diagnostics Working Group. The purpose of the Target Diagnostics Working Group is to prepare conceptual designs of target diagnostics for inclusion in the facility CDR and to determine how these specifications impact the CDR. To accomplish this, a subgroup has directed its efforts at constructing an approximate experimental plan for the ignition campaign of the NIF CDR. The results of this effort are contained in this document, the Experimental Plan for achieving fusion ignition in the NIF. This group initially concentrated on the flow-down requirements of the experimental campaign leading to ignition, which will dominate the initial efforts of the NIF. It is envisaged, however, that before ignition, there will be parallel campaigns supporting weapons physics, weapons effects, and other research. This plan was developed by analyzing the sequence of activities required to finally fire the laser at the level of power and precision necessary to achieve the conditions of an ignition hohlraum target, and to then use our experience in activating and running Nova experiments to estimate the rate of completing these activities.

  6. Patient protection and Affordable Care Act; data collection to support standards related to essential health benefits; recognition of entities for the accreditation of qualified health plans. Final rule.

    PubMed

    2012-07-20

    This final rule establishes data collection standards necessary to implement aspects of section 1302 of the Patient Protection and Affordable Care Act (Affordable Care Act), which directs the Secretary of Health and Human Services to define essential health benefits. This final rule outlines the data on applicable plans to be collected from certain issuers to support the definition of essential health benefits. This final rule also establishes a process for the recognition of accrediting entities for purposes of certification of qualified health plans.

  7. 76 FR 40394 - Final Plan for Fiscal Year 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... DEPARTMENT OF JUSTICE Office of Juvenile Justice and Delinquency Prevention [OJP (OJJDP) Docket No. 1563] Final Plan for Fiscal Year 2011 AGENCY: Office of Juvenile Justice and Delinquency Prevention.... SUMMARY: The Office of Juvenile Justice and Delinquency Prevention is publishing this notice of its Final...

  8. 75 FR 72963 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile Organic Compound Emissions From Industrial Solvent Cleaning Operations; Withdrawal of Direct Final Rule AGENCY: Environmental Protection... withdrawing the direct final rule to approve revisions to Maryland's State Implementation Plan (SIP). This SIP...

  9. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Harpers Ferry National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... guidance to park management for administration, development, and interpretation of park resources over the... General Management Plan for Harpers Ferry National Historical Park. SUMMARY: Pursuant to the National... availability of a Final Environmental Impact Statement for the General Management Plan for Harpers Ferry [[Page...

  10. 76 FR 60525 - Final Wilderness and Backcountry Management Plan and Environmental Impact Statement for Isle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... and Environmental Impact Statement for Isle Royale National Park, MI AGENCY: National Park Service... the availability of a Final Wilderness and Backcountry Management Plan and Environmental Impact... the Internet through the NPS Planning, Environment, and Public Comment Web site ( http://parkplanning...

  11. 76 FR 77900 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  12. 76 FR 13883 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  13. 78 FR 16401 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  14. 78 FR 35754 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  15. 77 FR 56770 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  16. Medicaid program; self-directed personal assistance services program State Plan option (cash and counseling). Final rule.

    PubMed

    2008-10-03

    This final rule provides guidance to States that want to administer self-directed personal assistance services through their State Plans, as authorized by the Deficit Reduction Act of 2005. The State plan option allows beneficiaries, through an approved self-directed services plan and budget, to purchase personal assistance services. The rule also provides guidance to ensure beneficiary health and welfare and financial accountability of the State Plan option.

  17. Developing and Testing Simulated Occupational Experiences for Distributive Education Students in Rural Communities: Volume III: Training Plans: Final Report.

    ERIC Educational Resources Information Center

    Virginia Polytechnic Inst. and State Univ., Blacksburg.

    Volume 3 of a three volume final report presents prototype job training plans developed as part of a research project which pilot tested a distributive education program for rural schools utilizing a retail store simulation plan. The plans are for 15 entry-level and 15 career-level jobs in seven categories of distributive business (department…

  18. 75 FR 69709 - Office of New Reactors; Notice of Availability of the Final Staff Guidance; Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... the Final Staff Guidance; Standard Review Plan, Section 13.6.6, Revision 0 on Cyber Security Plan... Reports for Nuclear Power Plants,'' Section 13.6.6, Revision 0 on ``Cyber Security Plan'' (Agencywide.... Disposition: On May 13, 2010, the NRC staff issued the proposed Revision 0 on SRP Section 13.6.6 on ``Cyber...

  19. Cultural Resource Protection Plan for the Remote-Handled Low-Level Waste Disposal Facility at the Idaho National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pace, Brenda Ringe; Gilbert, Hollie Kae

    2015-05-01

    This plan addresses cultural resource protection procedures to be implemented during construction of the Remote Handled Low Level Waste project at the Idaho National Laboratory. The plan proposes pre-construction review of proposed ground disturbing activities to confirm avoidance of cultural resources. Depending on the final project footprint, cultural resource protection strategies might also include additional survey, protective fencing, cultural resource mapping and relocation of surface artifacts, collection of surface artifacts for permanent curation, confirmation of undisturbed historic canal segments outside the area of potential effects for construction, and/or archaeological test excavations to assess potential subsurface cultural deposits at known culturalmore » resource locations. Additionally, all initial ground disturbing activities will be monitored for subsurface cultural resource finds, cultural resource sensitivity training will be conducted for all construction field personnel, and a stop work procedure will be implemented to guide assessment and protection of any unanticipated discoveries after initial monitoring of ground disturbance.« less

  20. FoCa: a modular treatment planning system for proton radiotherapy with research and educational purposes

    NASA Astrophysics Data System (ADS)

    Sánchez-Parcerisa, D.; Kondrla, M.; Shaindlin, A.; Carabe, A.

    2014-12-01

    FoCa is an in-house modular treatment planning system, developed entirely in MATLAB, which includes forward dose calculation of proton radiotherapy plans in both active and passive modalities as well as a generic optimization suite for inverse treatment planning. The software has a dual education and research purpose. From the educational point of view, it can be an invaluable teaching tool for educating medical physicists, showing the insights of a treatment planning system from a well-known and widely accessible software platform. From the research point of view, its current and potential uses range from the fast calculation of any physical, radiobiological or clinical quantity in a patient CT geometry, to the development of new treatment modalities not yet available in commercial treatment planning systems. The physical models in FoCa were compared with the commissioning data from our institution and show an excellent agreement in depth dose distributions and longitudinal and transversal fluence profiles for both passive scattering and active scanning modalities. 3D dose distributions in phantom and patient geometries were compared with a commercial treatment planning system, yielding a gamma-index pass rate of above 94% (using FoCa’s most accurate algorithm) for all cases considered. Finally, the inverse treatment planning suite was used to produce the first prototype of intensity-modulated, passive-scattered proton therapy, using 13 passive scattering proton fields and multi-leaf modulation to produce a concave dose distribution on a cylindrical solid water phantom without any field-specific compensator.

  1. 76 FR 38146 - Revision to the Final Principles of Integrated Resource Planning for Use in Resource Acquisition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... DEPARTMENT OF ENERGY Western Area Power Administration Revision to the Final Principles of... Administration (Western) published proposed Principles for Integrated Resource planning (IRP) for use in its... December 6, 1994. After considering public comments on the proposed principles, Western adopted the Final...

  2. Gulf of Mexico Sales 147 and 150: Central and Western planning areas. Final environmental impact statement, Volume 1: Sections 1 through 4.C

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    This Final Environmental Impact Statement (EIS) covers the proposed 1994 Gulf of Mexico OCS oil and gas lease sales [Central Gulf of Mexico Sale 147 (March 1994) and Western Gulf of Mexico Sale 150 (August 1994)]. This document includes the purpose and background of the proposed actions, the alternatives, the descriptions of the affected environment, and the potential environmental impacts of the proposed actions and alternatives. Proposed mitigating measures and their effects are analyzed, in addition to potential cumulative impacts resulting from proposed activities.

  3. UCSD Performance in the Edge Plasma Simulation (EPSI) Project. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tynan, George Robert

    This report contains a final report on the activities of UC San Diego PI G.R. Tynan and his collaborators as part of the EPSI Project, that was led by Dr. C.S. Chang, from PPPL. As a part of our work, we carried out several experiments on the ALCATOR C-­MOD tokamak device, aimed at unraveling the “trigger” or cause of the spontaneous transition from low-­mode confinement (L-­mode) to high confinement (H-­mode) that is universally observed in tokamak devices, and is planned for use in ITER.

  4. Astronomy in the streets

    NASA Astrophysics Data System (ADS)

    Kebe, Fatoumata

    2015-08-01

    The Ephemerides Association was founded last year by a PhD student in Astronomy. The association is devoted to the promotion and advancement of knowledge of the universe through research and education.The main activities of the association are scientific meetings, the planning and realization of scientific projects, the support of the scientific activities of its members, and the dissemination of related information among members and other interested persons.The association targets the disadvantaged zones of the Paris suburbs.The main issue was how to bring astronomy in those places. In the suburbs, since most of the youth are poor, most leisure activities like cinema are out of your reach. Thus, mostly of them will play football or basketball outside.We decided to go to meet young people who find themselves together in the evening. We prepare the telescope as well as the fasicules to start the observation of the planets. The discussion finally lead to their career plans and aspirations. Astronomy has become a tool to address societal issues. We present our results after one year of activity.

  5. Design and Development of Instructional Modules for Transportation Education and Development and Evaluation of Diffusion and Adoption Plan. Final Report.

    ERIC Educational Resources Information Center

    DeVore, Paul W.

    The background and objectives of the 1985-1986 Transportation Education Project of the Urban Mass Transportation Agency (UMTA) are discussed, along with project activities. The project was undertaken to transfer knowledge gained from federally-sponsored research and demonstrations to transit systems and to include the knowledge in college courses…

  6. DeSoto County District Plan for Career Education Development Program. Final Performance Report, January 1 through June 30, 1976.

    ERIC Educational Resources Information Center

    Pelletti, John C.; Dale, John R.

    An evaluation of the DeSoto County, Florida Career Education Project was conducted to determine the effectiveness of career education activities in grades K-12. Project goals emphasized at the elementary level were self-awareness, attitudes/appreciations, and career awareness. Career awareness and attitudes/appreciations were emphasized at the…

  7. 77 FR 39180 - Withdrawal of Direct Final Rule Revising the California State Implementation Plan, South Coast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9690-9] Withdrawal of Direct Final Rule Revising the California State Implementation Plan, South Coast Air Quality Management... State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District...

  8. A Functional Plan for an Illinois Library Telecommunications Network. The Final Report.

    ERIC Educational Resources Information Center

    Calabrese, Alice; And Others

    This final report describes the plan developed by the Northern Illinois Learning Resources Cooperative, a consortium of 44 community colleges and other academic institutions, which was awarded a Library Services and Construction Act (LSCA) Title III planning grant to research the requirements for a statewide electronic network that would provide…

  9. Federal employees health benefits program: discontinuance of health plan in an emergency. Final regulation.

    PubMed

    2007-01-17

    The Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) regulations regarding discontinuance of a health plan to include situations in which a health plan becomes incapacitated, either temporarily or permanently, as the result of a disaster.

  10. 77 FR 65125 - Approval and Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... controls are enforced through the associated SIP rules or Federal Implementation Plans (FIPs). Any purchase... Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure Requirements for the 1997 and... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to approve the State Implementation...

  11. Neural signatures of response planning occur midway through an incoming question in conversation

    PubMed Central

    Bögels, Sara; Magyari, Lilla; Levinson, Stephen C.

    2015-01-01

    A striking puzzle about language use in everyday conversation is that turn-taking latencies are usually very short, whereas planning language production takes much longer. This implies overlap between language comprehension and production processes, but the nature and extent of such overlap has never been studied directly. Combining an interactive quiz paradigm with EEG measurements in an innovative way, we show that production planning processes start as soon as possible, that is, within half a second after the answer to a question can be retrieved (up to several seconds before the end of the question). Localization of ERP data shows early activation even of brain areas related to late stages of production planning (e.g., syllabification). Finally, oscillation results suggest an attention switch from comprehension to production around the same time frame. This perspective from interactive language use throws new light on the performance characteristics that language competence involves. PMID:26242909

  12. NOAA Activities and Plans for New Operational Space Weather Platforms and Sensors

    NASA Astrophysics Data System (ADS)

    Biesecker, D. A.; Mulligan, P.; Cash, M. D.; Reinard, A.; Simpson, M.; Diedrich, B.; Socker, D. G.

    2013-12-01

    The National Oceanic and Atmospheric Administration (NOAA) is vigorously pursuing several space weather platforms that have been demonstrated as requiring replacement. In this time of limited budgets, this has led to the need for creative and innovative solutions. Just as importantly, NOAA is only 13 months away from the launch of its first L1 solar wind monitor, the DSCOVR mission. At the same time, a private company, L'Garde Inc. will be launching a solar sail mission with NOAA as a partner. Recognizing the importance of solar wind monitoring and the need for continuity, the planning process is already underway for the DSCOVR follow-on mission and scenarios for that include commercial data purchases and solar sails. Finally, NOAA planning for an operational coronagraph is moving forward, with continuing development of the Naval Research Laboratory's Compact Coronagraph (CCOR). We will provide details on the current NOAA plans for each of these missions.

  13. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pava, Daniel S.

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less

  14. Integrating planning and reactive control

    NASA Technical Reports Server (NTRS)

    Wilkins, David E.; Myers, Karen L.

    1994-01-01

    Our research is developing persistent agents that can achieve complex tasks in dynamic and uncertain environments. We refer to such agents as taskable, reactive agents. An agent of this type requires a number of capabilities. The ability to execute complex tasks necessitates the use of strategic plans for accomplishing tasks; hence, the agent must be able to synthesize new plans at run time. The dynamic nature of the environment requires that the agent be able to deal with unpredictable changes in its world. As such, agents must be able to react to unanticipated events by taking appropriate actions in a timely manner, while continuing activities that support current goals. The unpredictability of the world could lead to failure of plans generated for individual tasks. Agents must have the ability to recover from failures by adapting their activities to the new situation, or replanning if the world changes sufficiently. Finally, the agent should be able to perform in the face of uncertainty. The Cypress system, described here, provides a framework for creating taskable, reactive agents. Several features distinguish our approach: (1) the generation and execution of complex plans with parallel actions; (2) the integration of goal-driven and event driven activities during execution; (3) the use of evidential reasoning for dealing with uncertainty; and (4) the use of replanning to handle run-time execution problems. Our model for a taskable, reactive agent has two main intelligent components, an executor and a planner. The two components share a library of possible actions that the system can take. The library encompasses a full range of action representations, including plans, planning operators, and executable procedures such as predefined standard operating procedures (SOP's). These three classes of actions span multiple levels of abstraction.

  15. Integrating planning and reactive control

    NASA Astrophysics Data System (ADS)

    Wilkins, David E.; Myers, Karen L.

    1994-10-01

    Our research is developing persistent agents that can achieve complex tasks in dynamic and uncertain environments. We refer to such agents as taskable, reactive agents. An agent of this type requires a number of capabilities. The ability to execute complex tasks necessitates the use of strategic plans for accomplishing tasks; hence, the agent must be able to synthesize new plans at run time. The dynamic nature of the environment requires that the agent be able to deal with unpredictable changes in its world. As such, agents must be able to react to unanticipated events by taking appropriate actions in a timely manner, while continuing activities that support current goals. The unpredictability of the world could lead to failure of plans generated for individual tasks. Agents must have the ability to recover from failures by adapting their activities to the new situation, or replanning if the world changes sufficiently. Finally, the agent should be able to perform in the face of uncertainty. The Cypress system, described here, provides a framework for creating taskable, reactive agents. Several features distinguish our approach: (1) the generation and execution of complex plans with parallel actions; (2) the integration of goal-driven and event driven activities during execution; (3) the use of evidential reasoning for dealing with uncertainty; and (4) the use of replanning to handle run-time execution problems. Our model for a taskable, reactive agent has two main intelligent components, an executor and a planner. The two components share a library of possible actions that the system can take. The library encompasses a full range of action representations, including plans, planning operators, and executable procedures such as predefined standard operating procedures (SOP's). These three classes of actions span multiple levels of abstraction.

  16. Status of the NRC Decommissioning Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Orlando, D. A.; Camper, L.; Buckley, J.

    2003-02-24

    On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submitmore » Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lumsdaine, A.; Bjorholm, T.; Harris, J.

    The Wendelstein 7-X stellarator is in final stages of commissioning, and will begin operation in late 2015. In the first phase, the machine will operate with a limiter, and will be restricted to low power and short pulse. But in 2019, plans are for an actively cooled divertor to be installed, and the machine will operate in steady state at full power. Recently, plasma simulations have indicated that, in this final operational phase, a bootstrap current will evolve in certain scenarios. This will cause the sensitive ends of the divertor target to be overloaded beyond their qualified limit. A highmore » heat flux scraper element (HHF-SE) has been proposed in order to take up some of the convective flux and reduce the load on the divertor. In order to examine whether the HHF-SE will be able to effectively reduce the plasma flux in the divertor region of concern, and to determine how the pumping effectiveness will be affected by such a component, it is planned to include a test divertor unit scraper element (TDU-SE) in 2017 during an earlier operational phase. Several U.S. fusion energy science laboratories have been involved in the design, analysis (structural and thermal finite element, as well as computational fluid dynamics), plasma simulation, planning, prototyping, and diagnostic development around the scraper element program (both TDU-SE and HHF-SE). As a result, this paper presents an overview of all of these activities and their current status.« less

  18. Biomass power for rural development. Technical progress report, July 1--September 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the third quarter of 1997, much of the Consortium`s effort has focused on outreach activities, continued feedstock development, fuel supply planning, and fuel contract development, and preparation for 1998 scale-up activities. The Consortium also submitted a Phase-1 extension proposal during this period. A few of the more important milestones are outlined below. The fourth quarter of 1997 is expected to be dominated by Phase-II proposal efforts and planning for 1998 activities.« less

  19. 77 FR 28785 - Revisions to Federal Implementation Plans To Reduce Interstate Transport of Fine Particulate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Ozone AGENCY: Environmental Protection Agency (EPA). ACTION: Withdrawal of direct final rule. SUMMARY... Particulate Matter and Ozone'' as a direct final rule on February 21, 2012. Because the EPA received adverse... Implementation Plans To Reduce Interstate Transport of Fine Particulate Matter and Ozone'' as a direct final rule...

  20. PUREX/UO{sub 3} deactivation project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Washenfelder, D.J.

    1993-12-01

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retainedmore » during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.« less

  1. State-of-the-art study of resource characterization and planning for underground coal mining. Final technical report as of June 30, 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walton, D.; Ingham, W.; Kauffman, P.

    With the rapid developments taking place in coal mining technology and due to high investment costs, optimization of the structure of underground coal mines is crucial to the success of the mining project. The structure of a mine, once it is developed, cannot be readily changed and has a decisive influence on the productivity, safety, economics, and production capacity of the mine. The Department of Energy desires to ensure that the resource characterization and planning activity for underground coal mining will focus on those areas that offer the most promise of being advanced. Thus, this project was undertaken by Managementmore » Engineers Incorporated to determine the status in all aspects of the resource characterization and planning activities for underground coal mining as presently performed in the industry. The study team conducted a comprehensive computerized literature search and reviewed the results. From this a selection of the particularly relevant sources were annotated and a reference list was prepared, catalogued by resource characterization and mine planning activity. From this data, and discussions with industry representatives, academia, and research groups, private and federal, an assessment and evaluation was made of the state-of-the-art of each element in the resource characterization and mine planning process. The results of this analysis lead to the identifcation of areas requiring research and, specifically, those areas where DOE research efforts may be focused.« less

  2. Robust mobility in human-populated environments

    NASA Astrophysics Data System (ADS)

    Gonzalez, Juan Pablo; Phillips, Mike; Neuman, Brad; Likhachev, Max

    2012-06-01

    Creating robots that can help humans in a variety of tasks requires robust mobility and the ability to safely navigate among moving obstacles. This paper presents an overview of recent research in the Robotics Collaborative Technology Alliance (RCTA) that addresses many of the core requirements for robust mobility in human-populated environments. Safe Interval Path Planning (SIPP) allows for very fast planning in dynamic environments when planning timeminimal trajectories. Generalized Safe Interval Path Planning extends this concept to trajectories that minimize arbitrary cost functions. Finally, generalized PPCP algorithm is used to generate plans that reason about the uncertainty in the predicted trajectories of moving obstacles and try to actively disambiguate the intentions of humans whenever necessary. We show how these approaches consider moving obstacles and temporal constraints and produce high-fidelity paths. Experiments in simulated environments show the performance of the algorithms under different controlled conditions, and experiments on physical mobile robots interacting with humans show how the algorithms perform under the uncertainties of the real world.

  3. Marketing strategies for vascular practitioners.

    PubMed

    Satiani, Anand; Satiani, Bhagwan

    2009-09-01

    A common misconception is that marketing is synonymous with advertising. Marketing by physicians has undergone a transformation from the earlier unacceptable slick sales pitches to a more common sense, tasteful, comprehensive, and well thought out plan to reach potential patients. Marketing is a much broader concept comprising four aspects: product, price, promotion, and place. Marketing activities for a medical practice include not only external but internal tactics. Publicly available resources are available to assist physicians in developing and targeting the plan towards a narrow patient demographic. The marketing process includes: determining objectives, identifying resources, defining target population, honing a message, outlining a media plan, implementing the plan, and finally, evaluating the success or failure of the marketing campaign. A basic knowledge of marketing combined with a common sense approach can yield dividends for those practices that need the service. For surgical practices that exist in heavily populated urban areas with significant competition, a well thought out marketing plan can assist the practice in reaching out to new groups of patients and maintaining the existing patient base.

  4. Activity status and future plans for the Optical Laboratory of the National Astronomical Research Institute of Thailand

    NASA Astrophysics Data System (ADS)

    Buisset, Christophe; Poshyachinda, Saran; Soonthornthum, Boonrucksar; Prasit, Apirat; Alagao, Mary Angelie; Choochalerm, Piyamas; Wanajaroen, Weerapot; Lepine, Thierry; Rabbia, Yves; Aukkaravittayapun, Suparerk; Leckngam, Apichat; Thummasorn, Griangsak; Ngernsujja, Surin; Inpan, Anuphong; Kaewsamoet, Pimon; Lhospice, Esther; Meemon, Panomsak; Artsang, Pornapa; Suwansukho, Kajpanya; Sirichote, Wichit; Paenoi, Jitsupa

    2018-03-01

    The National Astronomical Research Institute of Thailand (NARIT) has developed since June 2014 an optical laboratory that comprises all the activities and facilities related to the research and development of new instruments in the following areas: telescope design, high dynamic and high resolution imaging systems and spectrographs. The facilities include ZEMAX and Solidwork software for design and simulation activities as well as an optical room with all the equipment required to develop optical setup with cutting-edge performance. The current projects include: i) the development of a focal reducer for the 2.3 m Thai National Telescope (TNT), ii) the development of the Evanescent Wave Coronagraph dedicated to the high contrast observations of star close environment and iii) the development of low resolution spectrographs for the Thai National Telescope and for the 0.7 m telescopes of NARIT regional observatories. In each project, our activities start from the instrument optical and mechanical design to the simulation of the performance, the development of the prototype and finally to the final system integration, alignment and tests. Most of the mechanical parts are manufactured by using the facilities of NARIT precision mechanical workshop that includes a 3-axis Computer Numerical Control (CNC) to machine the mechanical structures and a Coordinate Measuring Machine (CMM) to verify the dimensions. In this paper, we give an overview of the optical laboratory activities and of the associated facilities. We also describe the objective of the current projects, present the specifications and the design of the instruments and establish the status of development and we present our future plans.

  5. Using Planning, Scheduling and Execution for Autonomous Mars Rover Operations

    NASA Technical Reports Server (NTRS)

    Estlin, Tara A.; Gaines, Daniel M.; Chouinard, Caroline M.; Fisher, Forest W.; Castano, Rebecca; Judd, Michele J.; Nesnas, Issa A.

    2006-01-01

    With each new rover mission to Mars, rovers are traveling significantly longer distances. This distance increase raises not only the opportunities for science data collection, but also amplifies the amount of environment and rover state uncertainty that must be handled in rover operations. This paper describes how planning, scheduling and execution techniques can be used onboard a rover to autonomously generate and execute rover activities and in particular to handle new science opportunities that have been identified dynamically. We also discuss some of the particular challenges we face in supporting autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations. Finally, we describe our experiences in testing this work using several Mars rover prototypes in a realistic environment.

  6. 77 FR 34402 - Notice of Availability of the Final Land Use Analysis and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... mining would occur directly beneath the lake itself and no surface mining would take place. East Lynn... Rockspring have approved mining and reclamation plans from the West Virginia Department of Environmental... plan purposes if leases were to be issued and mine plans approved. The Office of Surface Mining...

  7. Preservation Planning Program. Study Report. Iowa State University Library. Final Report.

    ERIC Educational Resources Information Center

    Galejs, John; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…

  8. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  9. 75 FR 36064 - Stellwagen Bank National Marine Sanctuary Final Revised Management Plan: Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... on the Web site: http://stellwagen.noaa.gov . For a hard copy or data CD of the plan contact the sanctuary office at the contact number identified below. DATES: The final revised management plan is available to the public on June 17, 2010. FOR FURTHER INFORMATION CONTACT: Anne Smrcina, Stellwagen Bank...

  10. 75 FR 18113 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... final operations plan, contract, and environmental assessment (EA), and the Final Regulatory Flexibility... fish in a given FY, it must submit an operations plan, sector contract, and EA to NMFS by September 1... National Environmental Policy Act (NEPA), an EA was prepared for each operations plan. All sector EAs are...

  11. Earth observing system. Output data products and input requirements, version 2.0. Volume 3: Algorithm summary tables and non-EOS data products

    NASA Technical Reports Server (NTRS)

    Lu, Yun-Chi; Chang, Hyo Duck; Krupp, Brian; Kumar, Ravindar; Swaroop, Anand

    1992-01-01

    Volume 3 assists Earth Observing System (EOS) investigators in locating required non-EOS data products by identifying their non-EOS input requirements and providing the information on data sets available at various Distributed Active Archive Centers (DAAC's), including those from Pathfinder Activities and Earth Probes. Volume 3 is intended to complement, not to duplicate, the the EOSDIS Science Data Plan (SDP) by providing detailed data set information which was not presented in the SDP. Section 9 of this volume discusses the algorithm summary tables containing information on retrieval algorithms, expected outputs and required input data. Section 10 describes the non-EOS input requirements of instrument teams and IDS investigators. Also described are the current and future data holdings of the original seven DAACS and data products planned from the future missions and projects including Earth Probes and Pathfinder Activities. Section 11 describes source of information used in compiling data set information presented in this volume. A list of data set attributes used to describe various data sets is presented in section 12 along with their descriptions. Finally, Section 13 presents the SPSO's future plan to improve this report .

  12. Assessment of the Office of Security Cooperation-Iraq Mission Capabilities

    DTIC Science & Technology

    2013-09-18

    and report and other activities conducted by the Office of Special Plans & Operations to spo@dodig.mil Defense Hotline, The Pentagon ... Defense for Policy, U.S. Cenh·al Command, Joint Staff, and Defense Security Cooperation Agency responses when preparing the final repmt. Please...of Department of Defense support for executing security cooperation programs in Iraq and whether the Office of Security

  13. Appendixes L-P. Vol. II, A Plan for Managing the Development, Implementation and Operation of a Model Elementary Teacher Education Program.

    ERIC Educational Resources Information Center

    Oregon Coll. of Education, Monmouth.

    Five appendixes make up this part of the final report on the elementary teacher education program. Appendix L is a summary chart of the orientation meetings, giving dates, locations, and participants. Appendix M is a listing of the seven school districts actively participating in the OCE coalition, with a brief description of their essential…

  14. Civilian Health and Medical Program of the Uniformed Services (CHAMPUS); TRICARE Reserve Select; TRICARE Dental Program; Early Eligibility for TRICARE for Certain Reserve Component Members. Final rule.

    PubMed

    2015-09-15

    TRICARE Reserve Select (TRS) is a premium-based TRICARE health plan available for purchase worldwide by qualified members of the Ready Reserve and by qualified survivors of TRS members. TRICARE Dental Program (TDP) is a premium-based TRICARE dental plan available for purchase worldwide by qualified Service members. This final rule revises requirements and procedures for the TRS program to specify the appropriate actuarial basis for calculating premiums in addition to making other minor clarifying administrative changes. For a member who is involuntarily separated from the Selected Reserve under other than adverse conditions this final rule provides a time-limited exception that allows TRS coverage in effect to continue for up to 180 days after the date on which the member is separated from the Selected Reserve and TDP coverage in effect to continue for no less than 180 days after the separation date. It also expands early TRICARE eligibility for certain Reserve Component members from a maximum of 90 days to a maximum of 180 days prior to activation in support of a contingency operation for more than 30 days.

  15. Planning, Preparation, and Transport of the High-Enriched Uranium Spent Nuclear Fuel from the Czech Republic to the Russian Federation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M. J. Tyacke; I. Bolshinsky; Frantisek Svitak

    The United States, Russian Federation, and the International Atomic Energy Agency have been working together on a program called the Russian Research Reactor Fuel Return (RRRFR) Program, which is part of the Global Threat Reduction Initiative. The purpose of this program is to return Soviet or Russian-supplied high-enriched uranium (HEU) fuel, currently stored at Russian-designed research reactors throughout the world, to Russia. In February 2003, the RRRFR Program began discussions with the Nuclear Research Institute (NRI) in Rež, Czech Republic, about returning their HEU spent nuclear fuel to the Russian Federation for reprocessing. In March 2005, the U.S. Department ofmore » Energy signed a contract with NRI to perform all activities needed for transporting their HEU spent nuclear fuel to Russia. After 2 years of intense planning, preparations, and coordination at NRI and with three other countries, numerous organizations and agencies, and a Russian facility, this shipment is scheduled for completion before the end of 2007. This paper will provide a summary of activities completed for making this international shipment. This paper contains an introduction and background of the RRRFR Program and the NRI shipment project. It summarizes activities completed in preparation for the shipment, including facility preparations at NRI in Rež and FSUE “Mayak” in Ozyorsk, Russia; a new transportation cask system; regulatory approvals; transportation planning and preparation in the Czech Republic, Slovakia, Ukraine, and the Russian Federation though completion of the Unified Project and Special Ecological Programs. The paper also describes fuel loading and cask preparations at NRI and final preparations/approvals for transporting the shipment across the Czech Republic, Slovakia, Ukraine, and the Russian Federation to FSUE Mayak where the HEU spent nuclear fuel will be processed, the uranium will be downblended and made into low-enriched uranium fuel for commercial reactor use, and the high-level waste from the processing will be stabilized and stored for less than 20 years before being sent back to the Czech Republic for final disposition. Finally, the paper contains a section for the summary and conclusions.« less

  16. Group health plans and health insurance issuers relating to coverage of preventive services under the Patient Protection and Affordable Care Act. Final rules.

    PubMed

    2012-02-15

    These regulations finalize, without change, interim final regulations authorizing the exemption of group health plans and group health insurance coverage sponsored by certain religious employers from having to cover certain preventive health services under provisions of the Patient Protection and Affordable Care Act.

  17. 77 FR 24980 - Final General Management Plan and Environmental Impact Statement for the South Unit of Badlands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... the availability of the Final General Management Plan and Environmental Impact Statement (GMP/EIS) for the South Unit of Badlands National Park, South Dakota. DATES: The Final GMP/EIS will remain available... Register by the Environmental Protection Agency. ADDRESSES: Copies of the GMP/EIS are available by request...

  18. 76 FR 27086 - Final General Management Plan, Wilderness Management Plan, and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... transportation opportunities would be sought to encourage visitors to come to Sand, Basswood, and Oak islands... light stations would be restored or rehabilitated, similar to the Raspberry Island light station. The...

  19. Final Rule: Community Right-To-Know Reporting Requirements Federal Register Notice

    EPA Pesticide Factsheets

    Final reporting thresholds and threshold planning quantity (TPQ) for extremely hazardous substances (EHS) and non-EHS hazardous chemicals, required under Emergency Planning and Community Right-to-Know Act, Superfund Amendments and Reauthorization Act.

  20. [Final Resolutions Adopted by the Conference on Planning of Rural Areas in Europe, 7 October 1978].

    ERIC Educational Resources Information Center

    Council of Europe, Strasbourg (France).

    Two final resolutions were adopted by the Council of Europe at the October 1978 European Conference of Ministers Responsible for Regional Planning. Resolution 1 focused on guidelines for the planning of rural areas in Europe. Strategies and policies called for: a more balanced development which makes the living conditions of different regions as…

  1. 40 CFR 62.14535 - When must I comply with this subpart if I plan to continue operation of my CISWI unit?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule...) You must submit a waste management plan no later than April 5, 2004. (3) You must achieve final... complete retrofit construction of control devices, as specified in the final control plan, so that, if the...

  2. Nonprofit hospitals' approach to community health needs assessment.

    PubMed

    Pennel, Cara L; McLeroy, Kenneth R; Burdine, James N; Matarrita-Cascante, David

    2015-03-01

    We sought a better understanding of how nonprofit hospitals are fulfilling the community health needs assessment (CHNA) provision of the 2010 Patient Protection and Affordable Care Act to conduct CHNAs and develop CHNA and implementation strategies reports. Through an Internet search of an estimated 179 nonprofit hospitals in Texas conducted between December 1, 2013, and January 5, 2014, we identified and reviewed 95 CHNA and implementation strategies reports. We evaluated and scored reports with specific criteria. We analyzed hospital-related and other report characteristics to understand relationships with report quality. There was wide-ranging diversity in CHNA approaches and report quality. Consultant-led CHNA processes and collaboration with local health departments were associated with higher-quality reports. At the time of this study, the Internal Revenue Service had not yet issued the final regulations for the CHNA requirement. This provides an opportunity to strengthen the CHNA guidance for the final regulations, clarify the purpose of the assessment and planning process and reports, and better align assessment and planning activities through a public health framework.

  3. Medicaid program; correction and reduction plans for intermediate care facilities for the mentally retarded--HCFA. Final rule.

    PubMed

    1991-07-05

    This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.

  4. Career Plans of Final-Year South African Student Teachers: Migration to "Greener Pastures"?

    ERIC Educational Resources Information Center

    de Villiers, J. J. R.

    2017-01-01

    Teacher loss due to migration is a global phenomenon that impacts both developed and developing nations the world over. The aim of this study was to find out about the career plans of final-year South African student teachers. A group of final-year Bachelor of Education student teachers from a South African university responded to a questionnaire…

  5. Final Approval of Arizona Air Plan Revision; Stationary Sources; New Source Review; Ammonia

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning issuance of New Source Review (NSR) permits for stationary sources related to ammonia.

  6. 78 FR 760 - Notice of Availability of the Final General Management Plan/Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... document is available on the internet at the NPS Planning, Environment, and Public Comment Web site at http.../EIS assesses impacts to soil resources, water quality, soundscapes, vegetation and wildlife...

  7. Solar Dynamics Observatory Launch and Commissioning

    NASA Technical Reports Server (NTRS)

    O'Donnell, James R., Jr.; Kristin, D.; Bourkland, L.; Hsu, Oscar C.; Liu, Kuo-Chia; Mason, Paul A. C.; Morgenstern, Wendy M.; Russo, Angela M.; Starin, Scott R.; Vess, Melissa F.

    2011-01-01

    The Solar Dynamics Observatory (SDO) was launched on February 11, 2010. Over the next three months, the spacecraft was raised from its launch orbit into its final geosynchronous orbit and its systems and instruments were tested and calibrated in preparation for its desired ten year science mission studying the Sun. A great deal of activity during this time involved the spacecraft attitude control system (ACS); testing control modes, calibrating sensors and actuators, and using the ACS to help commission the spacecraft instruments and to control the propulsion system as the spacecraft was maneuvered into its final orbit. This paper will discuss the chronology of the SDO launch and commissioning, showing the ACS analysis work performed to diagnose propellant slosh transient and attitude oscillation anomalies that were seen during commissioning, and to determine how to overcome them. The simulations and tests devised to demonstrate correct operation of all onboard ACS modes and the activities in support of instrument calibration will be discussed and the final maneuver plan performed to bring SDO on station will be shown. In addition to detailing these commissioning and anomaly resolution activities, the unique set of tests performed to characterize SDO's on-orbit jitter performance will be discussed.

  8. Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

  9. Ruminant methane reduction through livestock development in Tanzania. Final report for US Department of Energy and US Initiative on Joint Implementation--Activities Implemented Jointly

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Livingston, Roderick

    1999-07-01

    This project was designed to help develop the US Initiative on Joint Implementation activities in Eastern Africa. It has been communicated in meetings with representatives from the Ministry of Environment of Tanzania and the consultant group that developed Tanzania's National Climate Change Action Plan, the Centre for Energy, Environment, Science and Technology, that this project fits very well with the developmental and environmental goals of the Government of Tanzania. The goal of the Activities Implemented Jointly ruminant livestock project is to reduce ruminant methane emissions in Eastern Africa. The project plans a sustainable cattle multiplication unit (CMU) at Mabuki Ranchmore » in the Mwanza Region of Tanzania. This CMU will focus on raising genetically improved animals to be purchased by farmers, developmental organizations, and other CMUs in Tanzania. Through the purchase of these animals farmers will raise their income generation potential and reduce ruminant methane emissions.« less

  10. Cost and Schedule Analytical Techniques Development: Option 2 Year

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the Option 2 Year from December 1, 1996 through November 30, 1997. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides products and deliverable in the form of models, data bases, methodologies, studies and analyses for the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) the Program Plans and Requirements Officer (PP02), and other user organizations. Detailed Monthly Progress reports were submitted to MSFC in accordance with the contract's Statement of Work, Section TV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at higher level. During this contract Option Year, SAIC expended 29,830 man-hours in tile performance of tasks called out in the Statement of Work and reported oil in this yearly Final Report. This represents approximately 16 full-time EPs. Included are the basis Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Chicago, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  11. 78 FR 52680 - Amendment to the International Traffic in Arms Regulations: Registration and Licensing of Brokers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-26

    ...The Department of State is issuing this interim final rule amending the International Traffic in Arms Regulations (ITAR) relating to brokers and brokering activities and to related provisions of the ITAR. These amendments clarify registration requirements, the scope of brokering activities, prior approval requirements and exemptions, procedures for obtaining prior approval and guidance, and reporting and recordkeeping of such activities. Conforming and technical changes are made to other parts of the ITAR that affect export as well as brokering activities. The revisions contained in this rule are part of the Department of State's retrospective plan under E.O. 13563 completed on August 17, 2011.

  12. Joint Planning and Development Office Work Plan FY10

    DTIC Science & Technology

    2010-01-01

    IPSA ) Division will make refinements to the NextGen Portfolio Analysis. In addition, IPSA will work with the Department of Defense (DoD) to define and...Submitted Interagency Portfolio and Systems Analysis ( IPSA ) DRAFT DoD Portfolio Analysis Criteria BASELINE DoD Portfolio Analysis Criteria DRAFT...WG Work Plan Review Prototype Capability Selected and Defined CHAs Complete Safety Metrics for IPSA Complete FINAL Prototype Report FINAL

  13. A Preservation Program for the Colorado State University Libraries. The Final Report of the ARL/OMS Preservation Planning Program.

    ERIC Educational Resources Information Center

    Green, Stephen; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…

  14. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  15. A logic model framework for evaluation and planning in a primary care practice-based research network (PBRN)

    PubMed Central

    Hayes, Holly; Parchman, Michael L.; Howard, Ray

    2012-01-01

    Evaluating effective growth and development of a Practice-Based Research Network (PBRN) can be challenging. The purpose of this article is to describe the development of a logic model and how the framework has been used for planning and evaluation in a primary care PBRN. An evaluation team was formed consisting of the PBRN directors, staff and its board members. After the mission and the target audience were determined, facilitated meetings and discussions were held with stakeholders to identify the assumptions, inputs, activities, outputs, outcomes and outcome indicators. The long-term outcomes outlined in the final logic model are two-fold: 1.) Improved health outcomes of patients served by PBRN community clinicians; and 2.) Community clinicians are recognized leaders of quality research projects. The Logic Model proved useful in identifying stakeholder interests and dissemination activities as an area that required more attention in the PBRN. The logic model approach is a useful planning tool and project management resource that increases the probability that the PBRN mission will be successfully implemented. PMID:21900441

  16. Final Environmental Assessment for the Bridge Replacement and Scour Protection Measures at Avon Park Air Force Range, Florida

    DTIC Science & Technology

    2012-03-01

    stipulated in the permit. Potential indigo snake refugia: gopher tortoise burrows , active or inactive, other holes, ground cavities, and root hollows...holes, cavities, and snake refugia other than gopher tortoise burrows will be inspected each morning before planned site manipulation of a particular...University 1999 Years Experience: 12 Larry McLain Operational Transportation Manager and Range Maintenance Manager Clarence Morgan Rangeland

  17. Air Force Global Weather Central System Architecture Study. Final System/Subsystem Summary Report. Volume 7. Implementation and Development Plans

    DTIC Science & Technology

    1976-03-01

    special access; PS2 will be for the variable perimeter; and PS3, PS4 , and PS5 will make up the normal access area. This added computer power will be...implementation of PS1 and PS4 will continue as new com- munications consoles are actively established for possible side-by-side opera- tion of the

  18. Top Ten Tips for Assessing Project-Based Learning: Plus, a Bonus Tip on How to Assemble a PBL Tool Kit

    ERIC Educational Resources Information Center

    George Lucas Educational Foundation, 2011

    2011-01-01

    This classroom guide is intended to inspire and expand teachers' thinking about effective assessment in project-based learning (PBL). The tips listed in this guide are organized to follow the arc of a project. First comes planning, then the launch into active learning, and then a culminating presentation. Reflection is the final stage, and it's…

  19. Final Environmental Assessment Implementation of the Integrated Natural Resources Management Plan for Avon Park Air Force Range Florida

    DTIC Science & Technology

    2004-01-01

    verticillata Hydrilla Hymenachne amplexicaulis West In mdian arsh grass Imperata cylindrica Cogon grass Lantana camara Lantana Ligustrum sinense Chinese...divine nightshade (Solanum nigrescens) Coast sandspur (Cenchrus incertus) Three plants — tropical soda apple (Solanum viarum), cogon grass ( Imperata ... cylindrica ), and smut grass (Sporobolus indicus) — are highly invasive and adventive and will be actively controlled with herbicide to reduce

  20. Developing biology teachers' pedagogical content knowledge through learning study: the case of teaching human evolution

    NASA Astrophysics Data System (ADS)

    Bravo, Paulina; Cofré, Hernán

    2016-11-01

    This work explores how pedagogical content knowledge (PCK) on evolution was modified by two biology teachers who participated in a professional development programme (PDP) that included a subsequent follow-up in the classroom. The PDP spanned a semester and included activities such as content updates, collaborative lesson planning, and the presentation of planned lessons. In the follow-up part, the lessons were videotaped and analysed, identifying strategies, activities, and conditions based on student learning about the theory of evolution. Data were collected in the first round with an interview before the training process, identifying these teachers' initial content representation (CoRe) for evolution. Then, a group interview was conducted after the lessons, and, finally, an interview of stimulated recall with each teacher was conducted regarding the subject taught to allow teachers to reflect on their practice (final CoRe). This information was analysed by the teachers and the researchers, reflecting on the components of the PCK, possible changes, and the rationale behind their actions. The results show that teachers changed their beliefs and knowledge about the best methods and strategies to teach evolution, and about students' learning obstacles and misconceptions on evolution. They realised how a review of their own practices promotes this transformation.

  1. Path planning and parameter optimization of uniform removal in active feed polishing

    NASA Astrophysics Data System (ADS)

    Liu, Jian; Wang, Shaozhi; Zhang, Chunlei; Zhang, Linghua; Chen, Huanan

    2015-06-01

    A high-quality ultrasmooth surface is demanded in short-wave optical systems. However, the existing polishing methods have difficulties meeting the requirement on spherical or aspheric surfaces. As a new kind of small tool polishing method, active feed polishing (AFP) could attain a surface roughness of less than 0.3 nm (RMS) on spherical elements, although AFP may magnify the residual figure error or mid-frequency error. The purpose of this work is to propose an effective algorithm to realize uniform removal of the surface in the processing. At first, the principle of the AFP and the mechanism of the polishing machine are introduced. In order to maintain the processed figure error, a variable pitch spiral path planning algorithm and the dwell time-solving model are proposed. For suppressing the possible mid-frequency error, the uniformity of the synthesis tool path, which is generated by an arbitrary point at the polishing tool bottom, is analyzed and evaluated, and the angular velocity ratio of the tool spinning motion to the revolution motion is optimized. Finally, an experiment is conducted on a convex spherical surface and an ultrasmooth surface is finally acquired. In conclusion, a high-quality ultrasmooth surface can be successfully obtained with little degradation of the figure and mid-frequency errors by the algorithm.

  2. The NASA Heliophysics Active Final Archive at the Space Physics Data Facility

    NASA Technical Reports Server (NTRS)

    McGuire, Robert E.

    2012-01-01

    The 2009 NASA Heliophysics Science Data Management Policy re-defined and extended the responsibilities of the Space Physics Data Facility (SPDF) project. Building on SPDF's established capabilities, the new policy assigned the role of active "Final Archive" for non-solar NASA Heliophysics data to SPDF. The policy also recognized and formalized the responsibilities of SPDF as a source for critical infrastructure services such as VSPO to the overall Heliophysics Data Environment (HpDE) and as a Center of Excellence for existing SPDF science-enabling services and software including CDAWeb, SSCWeb/4D Orbit Viewer, OMNIweb and CDF. We will focus this talk to the principles, strategies and planned SPDF architecture to effectively and efficiently perform these roles, with special emphasis on how SPDF will ensure the long-term preservation and ongoing online community access to all the data entrusted to SPDF. We will layout our archival philosophy and what we are advocating in our work with NASA missions both current and future, with potential providers of NASA and NASA-relevant archival data, and to make the data and metadata held by SPDF accessible to other systems and services within the overall HpOE. We will also briefly review our current services, their metrics and our current plans and priorities for their evolution.

  3. Standardizing an End-to-end Accounting Service

    NASA Technical Reports Server (NTRS)

    Greenberg, Edward; Kazz, Greg

    2006-01-01

    Currently there are no space system standards available for space agencies to accomplish end-to-end accounting. Such a standard does not exist for spacecraft operations nor for tracing the relationship between the mission planning activities, the command sequences designed to perform those activities, the commands formulated to initiate those activities and the mission data and specifically the mission data products created by those activities. In order for space agencies to cross-support one another for data accountability/data tracing and for inter agency spacecraft to interoperate with each other, an international CCSDS standard for end-to-end data accountability/tracing needs to be developed. We will first describe the end-to-end accounting service model and functionality that supports the service. This model will describe how science plans that are ultimately transformed into commands can be associated with the telemetry products generated as a result of their execution. Moreover, the interaction between end-to-end accounting and service management will be explored. Finally, we will show how the standard end-to-end accounting service can be applied to a real life flight project i.e., the Mars Reconnaissance Orbiter project.

  4. Agile Science Operations: A New Approach for Primitive Exploration Bodies

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Thompson, David R.; Castillo-Rogez, Julie C.; Doyle, Richard; Estlin, Tara; Mclaren, David

    2012-01-01

    Primitive body exploration missions such as potential Comet Surface Sample Return or Trojan Tour and Rendezvous would challenge traditional operations practices. Earth-based observations would provide only basic understanding before arrival and many science goals would be defined during the initial rendezvous. It could be necessary to revise trajectories and observation plans to quickly characterize the target for safe, effective observations. Detection of outgassing activity and monitoring of comet surface activity are even more time constrained, with events occurring faster than round-trip light time. "Agile science operations" address these challenges with contingency plans that recognize the intrinsic uncertainty in the operating environment and science objectives. Planning for multiple alternatives can significantly improve the time required to repair and validate spacecraft command sequences. When appropriate, time-critical decisions can be automated and shifted to the spacecraft for immediate access to instrument data. Mirrored planning systems on both sides of the light-time gap permit transfer of authority back and forth as needed. We survey relevant science objectives, identifying time bottlenecks and the techniques that could be used to speed missions' reaction to new science data. Finally, we discuss the results of a trade study simulating agile observations during flyby and comet rendezvous scenarios. These experiments quantify instrument coverage of key surface features as a function of planning turnaround time. Careful application of agile operations techniques can play a significant role in realizing the Decadal Survey plan for primitive body exploration

  5. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  6. The Rosetta Science Archive: Status and Plans for Completing and Enhancing the Archive Content

    NASA Astrophysics Data System (ADS)

    Heather, D.; Barthelemy, M.; Fraga, D.; Grotheer, E.; O'Rourke, L.; Taylor, M.

    2017-09-01

    On 30 September 2016, Rosetta's signal flat-lined, confirming that the spacecraft had completed its incredible mission by landing on the surface of Comet 67P/Churyumov-Gerasimenko. Although this marked an end to the spacecraft's active operations, intensive work is still on-going with instrument teams preparing their final science data increments for delivery and ingestion into ESA's Planetary Science Archive (PSA). In addition to this, ESA is establishing contracts with a number of instrument teams to enhance and improve their data and documentation in an effort to provide the best long- term archive possible for the Rosetta mission. This presentation will outline the current status of the Rosetta archive, as well as highlighting some of the 'enhanced archiving' activities planned and underway with the various instrument teams on Rosetta to ensure the scientific legacy of the mission.

  7. Long-term surveillance plan for the Green River, Utah, disposal site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-06-01

    The long-term surveillance plan (LTSP) for the Green River, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Green River disposal cell. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). This LTSP documents whether the land and interests are owned by the United States or an Indian tribe and detailsmore » how the long-term care of the disposal site will be carried out. The Green River, Utah, LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a).« less

  8. 75 FR 4417 - Wind Cave National Park, Custer County, SD

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... DEPARTMENT OF THE INTERIOR Wind Cave National Park, Custer County, SD AGENCY: National Park... Final Environmental Impact Statement, Wind Cave National Park, Custer County, South Dakota. SUMMARY... Management Plan and Final Environmental Impact Statement (Plan), Wind Cave National Park, Custer County...

  9. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    DOT National Transportation Integrated Search

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  10. Hazardous material transportation safety and security field operational test final detailed test plans : executive summary

    DOT National Transportation Integrated Search

    2003-09-16

    The objective of this Hazardous Material (HazMat) Transportation Safety and Security Field Operational Test (FOT) Final Detailed Test Plans evaluation is to measure the impact of technology solutions on the safety, security, and operational efficienc...

  11. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ...This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  12. Long-Range Strategic Planning for Libraries & Information Resources in the Research University. The Final Report on a Research Program on the Future of the Academic Research Library.

    ERIC Educational Resources Information Center

    California Univ., Los Angeles. Graduate School of Library and Information Science.

    This final report on a project at the University of California at Los Angeles (UCLA) on strategic planning for libraries and information resources in the research university begins with an introductory section on levels of consideration in planning; issues of current concern (effects of technology, economics of libraries, changes in the academic…

  13. Hawaii State Plan for Occupational Safety and Health. Final rule.

    PubMed

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  14. Medicare program; revisions to the Medicare Advantage and Part D prescription drug contract determinations, appeals, and intermediate sanctions processes. Final rule with comment period.

    PubMed

    2007-12-05

    This rule with comment period finalizes the Medicare program provisions relating to contract determinations involving Medicare Advantage (MA) organizations and Medicare Part D prescription drug plan sponsors, including eliminating the reconsideration process for review of contract determinations, revising the provisions related to appeals of contract determinations, and clarifying the process for MA organizations and Part D plan sponsors to complete corrective action plans. In this final rule with comment period, we also clarify the intermediate sanction and civil money penalty (CMP) provisions that apply to MA organizations and Medicare Part D prescription drug plan sponsors, modify elements of their compliance plans, retain voluntary self-reporting for Part D sponsors and implement a voluntary self-reporting recommendation for MA organizations, and revise provisions to ensure HHS has access to the books and records of MA organizations and Part D plan sponsors' first tier, downstream, and related entities. Although we have decided not to finalize the mandatory self-reporting provisions that we proposed, CMS remains committed to adopting a mandatory self-reporting requirement. To that end, we are requesting comments that will assist CMS in crafting a future proposed regulation for a mandatory self-reporting requirement.

  15. Application of multiple criteria decision methods in space exploration initiative design and planning

    NASA Technical Reports Server (NTRS)

    Masud, Abu S. M.

    1991-01-01

    Fellowship activities were directed towards the identification of opportunities for application of the Multiple Criteria Decision Making (MCDM) techniques in the Space Exploration Initiative (SEI) domain. I identified several application possibilities and proposed demonstration application in these three areas: evaluation and ranking of SEI architectures, space mission planning and selection, and space system design. Here, only the first problem is discussed. The most meaningful result of the analysis is the wide separation between the two top ranked architectures, indicating a significant preference difference between them. It must also be noted that the final ranking reflects, to some extent, the biases of the evaluators and their understanding of the architecture.

  16. Geospatial analysis based on GIS integrated with LADAR.

    PubMed

    Fetterman, Matt R; Freking, Robert; Fernandez-Cull, Christy; Hinkle, Christopher W; Myne, Anu; Relyea, Steven; Winslow, Jim

    2013-10-07

    In this work, we describe multi-layered analyses of a high-resolution broad-area LADAR data set in support of expeditionary activities. High-level features are extracted from the LADAR data, such as the presence and location of buildings and cars, and then these features are used to populate a GIS (geographic information system) tool. We also apply line-of-sight (LOS) analysis to develop a path-planning module. Finally, visualization is addressed and enhanced with a gesture-based control system that allows the user to navigate through the enhanced data set in a virtual immersive experience. This work has operational applications including military, security, disaster relief, and task-based robotic path planning.

  17. Transportation planning performance measures : final report.

    DOT National Transportation Integrated Search

    2005-10-01

    Oregon transportation plans, including the statewide Oregon Transportation Plan, and current regional transportation plans for the Portland, Salem, Eugene, and Medford metropolitan areas, contain some policy areas that are not adequately addressed by...

  18. 76 FR 76180 - Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Suisun Marsh...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ...) Federal joint lead agencies, and the State of California Department of Fish and Game (DFG), acting as the..., Preservation, and Restoration Plan (SMP) Final EIS/EIR. The SMP is a comprehensive plan designed to address the...

  19. Final Approval of Arizona Air Plan Revision; Lead-bearing Fugitive Dust Associated With Hayden, AZ Copper Smelter

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning emissions of lead-bearing fugitive dust associated with the primary copper smelter located in Hayden, Arizona.

  20. 77 FR 38801 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Resource Management (VRM) Plan, Amendment, Class Designation, Carbon County, WY, Review Period Ends: 07/30... Final Vehicle Management Plan, Implementation, Denali National Park and Preserve, AK, Review Period Ends.... EIS No. 20120199, Final EIS, RUS, MS, ADOPTION--Kemper County Integrated Gasification Combined Cycle...

  1. Advanced planning for ISS payload ground processing

    NASA Astrophysics Data System (ADS)

    Page, Kimberly A.

    2000-01-01

    Ground processing at John F. Kennedy Space Center (KSC) is the concluding phase of the payload/flight hardware development process and is the final opportunity to ensure safe and successful recognition of mission objectives. Planning for the ground processing of on-orbit flight hardware elements and payloads for the International Space Station is a responsibility taken seriously at KSC. Realizing that entering into this operational environment can be an enormous undertaking for a payload customer, KSC continually works to improve this process by instituting new/improved services for payload developer/owner, applying state-of-the-art technologies to the advanced planning process, and incorporating lessons learned for payload ground processing planning to ensure complete customer satisfaction. This paper will present an overview of the KSC advanced planning activities for ISS hardware/payload ground processing. It will focus on when and how KSC begins to interact with the payload developer/owner, how that interaction changes (and grows) throughout the planning process, and how KSC ensures that advanced planning is successfully implemented at the launch site. It will also briefly consider the type of advance planning conducted by the launch site that is transparent to the payload user but essential to the successful processing of the payload (i.e. resource allocation, executing documentation, etc.) .

  2. International Research Reactor Decommissioning Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leopando, Leonardo; Warnecke, Ernst

    2008-01-15

    Many research reactors have been or will be shut down and are candidates for decommissioning. Most of the respective countries neither have a decommissioning policy nor the required expertise and funds to effectively implement a decommissioning project. The IAEA established the Research Reactor Decommissioning Demonstration Project (R{sup 2}D{sup 2}P) to help answer this need. It was agreed to involve the Philippine Research Reactor (PRR-1) as model reactor to demonstrate 'hands-on' experience as it is just starting the decommissioning process. Other facilities may be included in the project as they fit into the scope of R{sup 2}D{sup 2}P and complement tomore » the PRR-1 decommissioning activities. The key outcome of the R{sup 2}D{sup 2}P will be the decommissioning of the PRR-1 reactor. On the way to this final goal the preparation of safety related documents (i.e., decommissioning plan, environmental impact assessment, safety analysis report, health and safety plan, cost estimate, etc.) and the licensing process as well as the actual dismantling activities could provide a model to other countries involved in the project. It is expected that the R{sup 2}D{sup 2}P would initiate activities related to planning and funding of decommissioning activities in the participating countries if that has not yet been done.« less

  3. B Plant Complex preclosure work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less

  4. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  5. SmartStaff: A Support Concept for Staff Planning

    DTIC Science & Technology

    2000-11-01

    facilitated time management and decreased the ambiguities of the plans presented. However, the quality of the final plan did not improve. Team decision making, Team Planning, Group Support Systems, Task Group Staff

  6. Federal Research Action Plan on Recycled Tire Crumb Used ...

    EPA Pesticide Factsheets

    Over the past several years, parents, athletes, schools, and communities have raised concerns about the safety of recycled tire crumb rubber used as infill for playing fields and playgrounds in the United States. The public has expressed concerns that the use of these fields could potentially be related to certain health effects. Studies to date have not shown an elevated health risk from playing on fields with tire crumb rubber, but these studies have limitations and do not comprehensively evaluate the concerns about health risks from exposure to tire crumb rubber. This status report provides a summary of activities to date, including: (1) stakeholder outreach, (2) the tire crumb rubber manufacturing industry, (3) the final peer-reviewed Literature Review/Gaps Analysis (LRGA), (4) progress on the research activities, and (5) next steps and a timeline for completion of the final report. The status report does not include research findings.

  7. Information-seeking strategies and science content understandings of sixth-grade students using on-line learning environments

    NASA Astrophysics Data System (ADS)

    Hoffman, Joseph Loris

    1999-11-01

    This study examined the information-seeking strategies and science content understandings learners developed as a result of using on-line resources in the University of Michigan Digital Library and on the World Wide Web. Eight pairs of sixth grade students from two teachers' classrooms were observed during inquiries for astronomy, ecology, geology, and weather, and a final transfer task assessed learners' capabilities at the end of the school year. Data included video recordings of students' screen activity and conversations, journals and completed activity sheets, final artifacts, and semi-structured interviews. Learners' information-seeking strategies included activities related to asking, planning, tool usage, searching, assessing, synthesizing, writing, and creating. Analysis of data found a majority of learners posed meaningful, openended questions, used technological tools appropriately, developed pertinent search topics, were thoughtful in queries to the digital library, browsed sites purposefully to locate information, and constructed artifacts with novel formats. Students faced challenges when planning activities, assessing resources, and synthesizing information. Possible explanations were posed linking pedagogical practices with learners' growth and use of inquiry strategies. Data from classroom-lab video and teacher interviews showed varying degrees of student scaffolding: development and critique of initial questions, utilization of search tools, use of journals for reflection on activities, and requirements for final artifacts. Science content understandings included recalling information, offering explanations, articulating relationships, and extending explanations. A majority of learners constructed partial understandings limited to information recall and simple explanations, and these occasionally contained inaccurate conceptualizations. Web site design features had some influence on the construction of learners' content understandings. Analysis of data suggests sites with high quality general design, navigation, and content helped to foster the construction of broad and accurate understandings, while context and interactivity had less impact. However, student engagement with inquiry strategies had a greater impact on the construction of understandings. Gaining accurate and in-depth understandings from on-line resources is a complex process for young learners. Teachers can support students by helping them engage in all phases of the information-seeking process, locate useful information with prescreened resources, build background understanding with off-line instruction, and process new information deeply through extending writing and conversation.

  8. Highly Efficient Training, Refinement, and Validation of a Knowledge-based Planning Quality-Control System for Radiation Therapy Clinical Trials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Nan; Carmona, Ruben; Sirak, Igor

    Purpose: To demonstrate an efficient method for training and validation of a knowledge-based planning (KBP) system as a radiation therapy clinical trial plan quality-control system. Methods and Materials: We analyzed 86 patients with stage IB through IVA cervical cancer treated with intensity modulated radiation therapy at 2 institutions according to the standards of the INTERTECC (International Evaluation of Radiotherapy Technology Effectiveness in Cervical Cancer, National Clinical Trials Network identifier: 01554397) protocol. The protocol used a planning target volume and 2 primary organs at risk: pelvic bone marrow (PBM) and bowel. Secondary organs at risk were rectum and bladder. Initial unfiltered dose-volumemore » histogram (DVH) estimation models were trained using all 86 plans. Refined training sets were created by removing sub-optimal plans from the unfiltered sample, and DVH estimation models… and DVH estimation models were constructed by identifying 30 of 86 plans emphasizing PBM sparing (comparing protocol-specified dosimetric cutpoints V{sub 10} (percentage volume of PBM receiving at least 10 Gy dose) and V{sub 20} (percentage volume of PBM receiving at least 20 Gy dose) with unfiltered predictions) and another 30 of 86 plans emphasizing bowel sparing (comparing V{sub 40} (absolute volume of bowel receiving at least 40 Gy dose) and V{sub 45} (absolute volume of bowel receiving at least 45 Gy dose), 9 in common with the PBM set). To obtain deliverable KBP plans, refined models must inform patient-specific optimization objectives and/or priorities (an auto-planning “routine”). Four candidate routines emphasizing different tradeoffs were composed, and a script was developed to automatically re-plan multiple patients with each routine. After selection of the routine that best met protocol objectives in the 51-patient training sample (KBP{sub FINAL}), protocol-specific DVH metrics and normal tissue complication probability were compared for original versus KBP{sub FINAL} plans across the 35-patient validation set. Paired t tests were used to test differences between planning sets. Results: KBP{sub FINAL} plans outperformed manual planning across the validation set in all protocol-specific DVH cutpoints. The mean normal tissue complication probability for gastrointestinal toxicity was lower for KBP{sub FINAL} versus validation-set plans (48.7% vs 53.8%, P<.001). Similarly, the estimated mean white blood cell count nadir was higher (2.77 vs 2.49 k/mL, P<.001) with KBP{sub FINAL} plans, indicating lowered probability of hematologic toxicity. Conclusions: This work demonstrates that a KBP system can be efficiently trained and refined for use in radiation therapy clinical trials with minimal effort. This patient-specific plan quality control resulted in improvements on protocol-specific dosimetric endpoints.« less

  9. Miami Valley ITS : early deployment plan : final user service plan

    DOT National Transportation Integrated Search

    1997-07-01

    This User Service Plan is the first major product of the process to develop an Intelligent Transportation System (ITS) Early Deployment Plan (EDP) for the Miami Valley. This User Service Plan documents the travel environment, growth trends and transp...

  10. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  11. Strategic Planning Study Team. Final Report.

    ERIC Educational Resources Information Center

    Tennessee Univ., Chattanooga.

    This final report presents the results of a University of Tennessee at Chattanooga's (UTC) strategic planning study team, which was charged with documenting computerized services currently available and recommending to the UTC administration areas in which new services should be introduced at the university. A questionnaire was administered to…

  12. 76 FR 50413 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  13. 78 FR 68739 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  14. 76 FR 8649 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  15. 77 FR 22215 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  16. 76 FR 27889 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  17. 76 FR 63836 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  18. 78 FR 11093 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  19. 76 FR 21252 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  20. 77 FR 41270 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  1. 76 FR 2578 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  2. 78 FR 62426 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  3. 77 FR 28477 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  4. 78 FR 42009 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  5. 78 FR 2881 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  6. 76 FR 70639 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  7. 75 FR 69588 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  8. 77 FR 68685 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  9. 76 FR 41689 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  10. 78 FR 28490 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  11. 77 FR 2015 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  12. 77 FR 8730 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  13. 78 FR 22192 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  14. 77 FR 62433 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  15. 75 FR 63380 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  16. Patient Protection and Affordable Care Act; third party payment of qualified health plan premiums. Interim final rule with comment period.

    PubMed

    2014-03-19

    This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.

  17. MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints

    DTIC Science & Technology

    2001-08-01

    progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New

  18. Roadmap for the Hypersonics Programs of the Department of Defense

    DTIC Science & Technology

    2008-02-01

    development and integration of a 1MW e-bean system to provide the necessary energy into the wind tunnel flow field to enable longer duration experiments at...acquired. Finally, “Test and Evaluation” (T&E) is defined as tests and experiments in support of research development and acquisition of systems...Research Experimentation (HIFiRE) project, the DARPA/AF Falcon program, and the DoD Next Generation Launch planning activities. 13 Joint

  19. UNIVERSITY RESEARCH PROGRAM IN ROBOTICS, Final Technical Annual Report, Project Period: 9/1/04 - 8/31/05

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James S. Tulenko; Carl D. Crane III

    The University Research Program in Robotics (URPR) Implementation Plan is an integrated group of universities performing fundamental research that addresses broad-based robotics and automation needs of the NNSA Directed Stockpile Work (DSW) and Campaigns. The URPR mission is to provide improved capabilities of robotics science and engineering to meet the future needs of all weapon systems and other associated NNSA/DOE activities.

  20. A New Strategic Direction for the AAHSLD Annual Statistics: Planning, Service Roles, Performance Measures, and Management Information Systems for Academic Health Science Libraries: Final Report for Phase I.

    ERIC Educational Resources Information Center

    McClure, Charles R.; And Others

    This report presents a summary of activities, findings, and recommendations from Phase I of a project to improve the effectiveness of academic health science libraries and their provision of information services. The objectives for Phase I of the project are given: (1) to identify academic health science library requirements in the areas of…

  1. U.S. Army Medical Materiel Development Activity, 1987 Annual Report

    DTIC Science & Technology

    1988-05-06

    Argentina to determine efficacy of the Candid #1 vaccine in both immune and nonimmune populations. 12 %0 0 Shigella Vaccines are oral products containing...in Cebus monkeys at the University of Lowell, MA. Working groups were convened to outline clinical testing of the TAP and to finalize the draft...measure exposure rates. Data collected from these studies will be used to plan field trials for vaccines that have been developed including Shigella

  2. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: D4 Project/Reactor ISS Closure Projects Field Remediation Project Waste Operations Project End State and Final Closure Project Mission/General Support, Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Project Integration

    2005-09-26

    The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.

  3. Permafrost knowledge to serve as foundation for Inuit community planning

    NASA Astrophysics Data System (ADS)

    Gibéryen, T.; Allard, M.

    2011-12-01

    With the recent announcement of Québec's provincial government's Plan Nord, Nunavik will see a 500 new houses sweep onto it's territory over the next 5 years. The local Inuit communities are confronted with the pressuring need to find suitable land to safely accommodate the new infrastructures in the long term. Additional to human and environmental constraints are those related to warming permafrost. Intensive studies on four Nunavik communities (Inukjuak, Puvirnituq, Akulivik, Kangirsuk) have allowed us to extensively consult local and regional authorities on their planning and management considerations. Recent and archived drilling data have been used to corroborate air photo interpretation, surficial geology and permafrost mapping. All collected information are integrated into aggregated maps that will eventually serve as community master plans. General recommendations on how to best manage and plan for community expansions on warming permafrost are made. Appropriate engineering techniques assuring long-term stable foundations are outlined and additionally mapped, taking into consideration the variable terrain conditions and simulated changes in permafrost temperature and active layer thickness according to climate change scenarios. The final purpose of our results is for them to support local and regional governments in their community planning process towards the best possible climate change adaptation strategies.

  4. 25 CFR 1000.20 - What is required in a planning report?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... planning phase, the Tribe/Consortium must prepare and submit to the Secretary a final planning report. (a... Tribe's/Consortium's planning efforts have revealed that its current organization is adequate to assume...

  5. Patient Protection and Affordable Care Act; Market Stabilization. Final rule.

    PubMed

    2017-04-18

    This rule finalizes changes that will help stabilize the individual and small group markets and affirm the traditional role of State regulators. This final rule amends standards relating to special enrollment periods, guaranteed availability, and the timing of the annual open enrollment period in the individual market for the 2018 plan year; standards related to network adequacy and essential community providers for qualified health plans; and the rules around actuarial value requirements.

  6. 77 FR 60137 - Lee Metcalf National Wildlife Refuge, Ravalli County, MT; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    .... The final plan identifies goals, objectives, and strategies that describe the future management of the... management purpose, for migratory birds'' (Migratory Bird Conservation Act); and (2) ``for (a) incidental... participate in interpretive programs in the indoor and outdoor classrooms. The Refuge provides habitat for...

  7. 77 FR 24403 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    .../Infectious Waste Incinerators'' (HMIWI). The Illinois Environmental Protection Agency (IEPA) submitted the... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0087; FRL-9663-4] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...

  8. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  9. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  10. 76 FR 67369 - Revisions to the California State Implementation Plan, Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... the California State Implementation Plan, Joaquin Valley Unified Air Pollution Control District and Imperial County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution...

  11. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Management Plan and... Administration (NOAA), Department of Commerce (DOC). ACTION: Notice of public availability. SUMMARY: NOAA is... the wreck of the famed Civil War ironclad, USS Monitor, best known for its battle with the Confederate...

  12. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  13. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  14. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  15. Decommissioning strategy for liquid low-level radioactive waste surface storage water reservoir.

    PubMed

    Utkin, S S; Linge, I I

    2016-11-22

    The Techa Cascade of water reservoirs (TCR) is one of the most environmentally challenging facilities resulted from FSUE "PA "Mayak" operations. Its reservoirs hold over 360 mln m 3 of liquid radioactive waste with a total activity of some 5 × 10 15 Bq. A set of actions implemented under a special State program involving the development of a strategic plan aimed at complete elimination of TCR challenges (Strategic Master-Plan for the Techa Cascade of water reservoirs) resulted in considerable reduction of potential hazards associated with this facility. The paper summarizes the key elements of this master-plan: defining TCR final state, feasibility study of the main strategies aimed at its attainment, evaluation of relevant long-term decommissioning strategy, development of computational tools enabling the long-term forecast of TCR behavior depending on various engineering solutions and different weather conditions. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The Government Performance and Results Act (GPRA) was passed by Congress and signed by the President in 1993. GPRA was enacted to improve the efficiency of all Federal agencies, with the following specific goals: (1) Improve Federal program management, effectiveness, and public accountability; (2) Improve Congressional decision making on where to commit the Nation's financial and human resources; and (3) Improve citizen confidence in government performance. GPRA directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The Act directs agencies to manage and measure results to justify Congressional appropriations and authorizations. The Report Consolidation Act of 2000 directs agencies to provide a report on the degree of success in achieving the goals and performance measures defined in the strategic and performance plans one hundred and fifty days after the completion of the fiscal year.

  17. Patient Protection and Affordable Care Act; health insurance market rules. Final rule.

    PubMed

    2013-02-27

    This final rule implements provisions related to fair health insurance premiums, guaranteed availability, guaranteed renewability, single risk pools, and catastrophic plans, consistent with title I of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. The final rule clarifies the approach used to enforce the applicable requirements of the Affordable Care Act with respect to health insurance issuers and group health plans that are non-federal governmental plans. This final rule also amends the standards for health insurance issuers and states regarding reporting, utilization, and collection of data under the federal rate review program, and revises the timeline for states to propose state-specific thresholds for review and approval by the Centers for Medicare & Medicaid Services (CMS).

  18. Wake-Sleep Cycle Management during SUSOPS and CONOPS in French Military Forces: Policy and Ethics

    DTIC Science & Technology

    2009-10-01

    sleepiness for 48 hours. Finally, Z- hypnotics are also allowed to promote pre- planned sleep episodes. Nevertheless, the use of these drugs acting on...Finally, Z- hypnotics are also allowed to promote pre- planned sleep episodes. Nevertheless, the use of these drugs acting on the central nervous system...why the individual test of tolerance, planned in the MD instruction, seems to be particularly important for modafinil before operational use. 3.2

  19. Pretest information for a test to validate plume simulation procedures (FA-17)

    NASA Technical Reports Server (NTRS)

    Hair, L. M.

    1978-01-01

    The results of an effort to plan a final verification wind tunnel test to validate the recommended correlation parameters and application techniques were presented. The test planning effort was complete except for test site finalization and the associated coordination. Two suitable test sites were identified. Desired test conditions were shown. Subsequent sections of this report present the selected model and test site, instrumentation of this model, planned test operations, and some concluding remarks.

  20. [Situational profile and intervention strategy in the Mesoamerican region in maternal, neonatal and reproductive health area].

    PubMed

    Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María del Carmen; Iriarte, Emma; Danel, Isabella; Donnay, France; Alemán, Denis; Serrano, Roselyn; Morales, Evelyn; Largaespada, Natalia; González, José Douglas Jarquín; Hernández, Ma Del Carmen; Mejía, Claudia E Quiroz; González, Geneva; Carrera, Yadira; Valverde, Clelia; Luna, Rufino; Valencia-Mendoza, Atanacio; Sosa-Rubí, Sandra G; Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María Del Carmen

    2011-01-01

    To present the main results of the regional situation diagnosis and intervention plan developed in 2010 as part of the planning activities of the Mesoamerican Health System by the Working Group on Maternal, Reproductive and Neonatal Health. A group of experts and representatives from countries in the region (Central America and nine southern Mexican states) conducted an exhaustive review of available data to construct a situational analysis and a review of effective practices for improving maternal, reproductive and neonatal health. Finally, the group proposed a regional action plan, defining regional goals and specific interventions. The situational diagnosis suggests that, although there has been progress in the last 10 years, maternal and neonatal mortality rates are still unnaceptably high in the region, with a substantial variability across countries. The group proposed as a regional goal the reduction of maternal and neonatal mortality in accordance with the Millenium Development Goals. The regional plan recommends specific maternal and neonatal health interventions emphasizing obstetric and neonatal emergency care, skilled birth attendance and family planning. The plan also includes a five year implementation strategy, along with training and evaluation strategies. The regional plan for maternal, neonatal and reproductive health has the potential to be successful, provided it is effectively implemented.

  1. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  2. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  3. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) A cyber security plan in accordance with the criteria set forth in § 73.54 of this chapter; (iv) A... cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan, shall protect the plans and...

  4. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  5. Minimum Value of Eligible Employer-Sponsored Plans and Other Rules Regarding the Health Insurance Premium Tax Credit. Final regulations.

    PubMed

    2015-12-18

    This document contains final regulations on the health insurance premium tax credit enacted by the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010, as amended by the Medicare and Medicaid Extenders Act of 2010, the Comprehensive 1099 Taxpayer Protection and Repayment of Exchange Subsidy Overpayments Act of 2011, and the Department of Defense and Full-Year Continuing Appropriations Act, 2011. These final regulations affect individuals who enroll in qualified health plans through Affordable Insurance Exchanges (Exchanges, sometimes called Marketplaces) and claim the health insurance premium tax credit, and Exchanges that make qualified health plans available to individuals and employers.

  6. Nonprofit Hospitals’ Approach to Community Health Needs Assessment

    PubMed Central

    McLeroy, Kenneth R.; Burdine, James N.; Matarrita-Cascante, David

    2015-01-01

    Objectives. We sought a better understanding of how nonprofit hospitals are fulfilling the community health needs assessment (CHNA) provision of the 2010 Patient Protection and Affordable Care Act to conduct CHNAs and develop CHNA and implementation strategies reports. Methods. Through an Internet search of an estimated 179 nonprofit hospitals in Texas conducted between December 1, 2013, and January 5, 2014, we identified and reviewed 95 CHNA and implementation strategies reports. We evaluated and scored reports with specific criteria. We analyzed hospital-related and other report characteristics to understand relationships with report quality. Results. There was wide-ranging diversity in CHNA approaches and report quality. Consultant-led CHNA processes and collaboration with local health departments were associated with higher-quality reports. Conclusions. At the time of this study, the Internal Revenue Service had not yet issued the final regulations for the CHNA requirement. This provides an opportunity to strengthen the CHNA guidance for the final regulations, clarify the purpose of the assessment and planning process and reports, and better align assessment and planning activities through a public health framework. PMID:25602862

  7. Least-cost transportation planning in ODOT : phase 2 final report.

    DOT National Transportation Integrated Search

    1996-06-01

    This project is intended to suggest ways in which least-cost planning principles could be incorporated into the transportation planning process. The Mt. Hood corridor was chosen for examination. The examination of the planning process highlighted sev...

  8. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  9. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  10. Proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring site, in Weldon Spring, Missouri. The site is located about 30 mi west of St. Louis, in St. Charles County (Figure 1). This proposed action constitutes the final remedial action for the Weldon Spring site. The residual contamination in groundwater and springs at the Chemical Plant area is the only remaining contamination that needs to be addressed for the site. All other contamination has been addressed by previous remedial actions. After this remedial action is implemented, long-termmore » surveillance and maintenance activities will maintain the effectiveness of all remedial actions conducted at the Weldon Spring site, including this final remedial action for groundwater and springs that is being proposed in this plan. DOE complies with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in conducting remedial activities at the site. National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process; that is, the analysis conducted and presented in the remedial investigation/feasibility study (RI/FS) reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This PP is required under CERCLA to (1) notify the public and present a brief analysis of the remedial action alternatives, (2) identify and present the rationale for the preferred remedial action alternative identified in the PP, (3) summarize key information from the RI/FS evaluations, including the Baseline Risk Assessment (BRA), and (4) inform the public of its role in the remedy selection process and give the public the opportunity to participate in the process. Remediation activities at the Weldon Spring site have been coordinated with the U.S. Environmental Protection Agency (EPA) and the Missouri Department of Natural Resources (MDNR). The EPA has overall oversight and approval authority, with consultation provided by the MDNR. A range of alternatives was considered in identifying the preferred alternative. The alternatives were developed after careful analysis of geological, environmental, and human health and ecological risk data and an evaluation of the effectiveness, implementability, and cost of the various technologies available for groundwater remediation at the Chemical Plant area. Monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities has been selected as the preferred alternative.« less

  11. Regional economic impacts of current and proposed management alternatives for Don Edwards National Wildlife Refuge

    USGS Publications Warehouse

    Richardson, Leslie; Huber, Chris; Koontz, Lynne

    2012-01-01

    The National Wildlife Refuge System Improvement Act of 1997 requires all units of the National Wildlife Refuge System to be managed under a Comprehensive Conservation Plan. The Comprehensive Conservation Plan must describe the desired future conditions of a Refuge and provide long-range guidance and management direction to achieve refuge purposes. The Don Edwards San Francisco Bay National Wildlife Refuge, located at the south end of California's San Francisco Bay and one of seven refuges in the San Francisco Bay National Wildlife Refuge Complex, is in the process of developing a range of management goals, objectives, and strategies for the Comprehensive Conservation Plan. The Comprehensive Conservation Plan must contain an analysis of expected effects associated with current and proposed Refuge management strategies. For Refuge Comprehensive Conservation Plan planning, a regional economic analysis provides a means of estimating how current management (No Action Alternative) and proposed management activities (alternatives) affect the local economy. This type of analysis provides two critical pieces of information: (1) it illustrates the Don Edwards San Francisco Bay National Wildlife Refuge's contribution to the local community, and (2) it can help in determining whether economic effects are or are not a real concern in choosing among management alternatives. This report first presents a description of the local community and economy near the Don Edwards San Francisco Bay National Wildlife Refuge. Next, the methods used to conduct a regional economic impact analysis are described. An analysis of the final Comprehensive Conservation Plan management strategies that could affect stakeholders, residents, and the local economy is then presented. The management activities of economic concern in this analysis are: * Spending in the local community by Refuge visitors; * Refuge personnel salary spending; and * Refuge purchases of goods and services within the local community.

  12. Planning for Disaster.

    ERIC Educational Resources Information Center

    Lewis, Steven

    1996-01-01

    Disaster recovery planning need not be expensive nor complete to be effective. Systematic planning involves several crucial steps, including outlining the final plan, understanding the nature of a disaster's effects and the stages of disaster recovery, prioritizing appropriately, and learning how to test the plan in a practical way for the…

  13. Regional Haze Plan for Texas and Oklahoma

    EPA Pesticide Factsheets

    EPA partially approved and partially disapproved the Texas regional haze plan. EPA also finalized a plan to limit sulfur dioxide emissions from eight Texas coal-fired electricity generating facilities

  14. 75 FR 27944 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ...; State of California; PM-10; Determination of Attainment for the Coso Junction Nonattainment Area... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing its determination that the Coso Junction... Officer, GBUAPCD, to Doris Lo, Environmental Protection Specialist, EPA, with CosoJunction2010--MetAndTEOM...

  15. 77 FR 24483 - Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To Intervene, and...: Wausau Paper Mills, LLC. e. Name of Project: Rhinelander Hydroelectric Project. f. Location: The upper.... Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC, 515 Davenport St., Rhinelander, Wisconsin...

  16. FOCUS: a fire management planning system -- final report

    Treesearch

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  17. Medical loss ratio rebate requirements for non-federal governmental plans. Interim final rule with request for comments.

    PubMed

    2011-12-07

    This interim final rule with comment period revises the regulations implementing medical loss ratio (MLR) requirements for health insurance issuers under the Public Health Service Act in order to establish rules governing the distribution of rebates by issuers in group markets for non-Federal governmental plans.

  18. 77 FR 64734 - Approval and Promulgation of Implementation Plans; North Dakota: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Permitting Authority and Tailoring Rule; PM 2.5 NSR Implementation Rule AGENCY: Environmental Protection... Implementation Plan (SIP) relating to regulation of Greenhouse Gases (GHGs) and fine particulate matter (PM 2.5... Tailoring Final Rule'' and the final rule for ``Implementation of the New Source Review (NSR) Program for PM...

  19. 78 FR 34402 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ...-FF03E15000] Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement, Ni... Environmental Impact Statement (FEIS) associated with an application received from NiSource Inc. (hereafter ``Ni... Endangered Species Act of 1973, as amended (ESA). If issued, the ITP would authorize NiSource to take 10...

  20. 76 FR 52690 - Final Environmental Impact Statement on Nabesna Off-Road Vehicle Management Plan, Wrangell-St...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ...-Road Vehicle Management Plan, Wrangell-St. Elias National Park and Preserve AGENCY: National Park... a Final Environmental Impact Statement (FEIS) on Off-Road Vehicle Management in the Nabesna District... preferred alternative and four action alternatives for management of off-road vehicles in the Nabesna...

  1. 75 FR 21342 - Notice of Availability of the Final Environmental Impact Statement for the Mona to Oquirrh...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Corridor Project, Utah, and the Proposed Pony Express Resource Management Plan Amendment AGENCY: Bureau of...)/Proposed Resource Management Plan Amendment (RMPA) for the Mona to Oquirrh Transmission Corridor Project... Final EIS/Proposed RMPA for the Mona to Oquirrh Transmission Corridor Project have been sent to affected...

  2. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  3. 77 FR 24405 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Incinerators'' (HMIWI). The Indiana Department of Environmental Management (IDEM) submitted the revised State... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0086; FRL-9663-2] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...

  4. An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information (Final Report)

    EPA Science Inventory

    EPA announced the availability of the final report, An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information. This report is a review of decision-making processes of selected land protection prog...

  5. National Primary and Secondary Ambient Air Quality Standards (NAAQS) for Lead (Pb) and Implementation Plans for Lead NAAQS: 1978 Final Rule (43 FR 46246 & 46264)

    EPA Pesticide Factsheets

    This document is a copy of the Federal Register publication of the October 5, 1978 Final Rules for National Primary and Secondary Ambient Air Quality Standards for Lead (Pb) and Implementation Plans for Lead (Pb) NAAQS.

  6. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. OVERVIEW AND APPLICATION. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  7. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 4: ANALYTICAL GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  8. 75 FR 6218 - New Melones Lake Area Resource Management Plan, Tuolumne and Calaveras Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation New Melones Lake Area Resource Management Plan...) has made available for public review a Final RMP/EIS for the New Melones Lake Area. The Final RMP/EIS... Dan Holsapple, Acting New Melones Resource Manager, Bureau of Reclamation, at 209-536- 9094...

  9. 75 FR 44977 - General Management Plan/Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... Impact Statement for the General Management Plan (GMP/EIS) for Roosevelt-Vanderbilt National Historic Sites, Hyde Park, New York. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets detailing editorial corrections to...

  10. 40 CFR 62.14565 - How do I comply with the increment of progress for achieving final compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... complete retrofit construction of control devices, as specified in the final control plan, so that, when...

  11. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Historic trails. The four alternatives were: Alternative A: Continues existing management practices (no... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement...

  12. IPG Power Grid Overview

    NASA Technical Reports Server (NTRS)

    Hinke, Thomas

    2003-01-01

    This presentation will describe what is meant by grids and then cover the current state of the IPG. This will include an overview of the middleware that is key to the operation of the grid. The presentation will then describe some of the future directions that are planned for the IPG. Finally the presentation will conclude with a brief overview of the Global Grid Forum, which is a key activity that will contribute to the successful availability of grid components.

  13. Fort Devens Feasibility Study (FS) for Group 1A Sites, Final Data Gap Activities Work Plan

    DTIC Science & Technology

    1993-03-01

    3-6 3.1.7 Railroad Roundhouse ......................... 3-7 3.2 COLD SPRING BROOK LANDFILL BACKGROUND AND U CONDITIONS...wells SHL-3 and SHL-7) is the site of a former railroad roundhouse . This roundhouse was used between 1900 and 1935. Because of the age of the... Roundhouse 5 Environmental samples will be collected at four locations at the site of the former railroad roundhouse adjacent to Shepley’s Hill

  14. Supersonics--Airport Noise

    NASA Technical Reports Server (NTRS)

    Bridges, James

    2007-01-01

    At this, the first year-end meeting of the Fundamental Aeronautics Program, an overview of the Airport Noise discipline of the Supersonics Project leads the presentation of technical plans and achievements in this area of the Project. The overview starts by defining the Technical Challenges targeted by Airport Noise efforts, and the Approaches planned to meet these challenges. These are fleshed out in Elements, namely Prediction, Diagnostics, and Engineering, and broken down into Tasks. The Tasks level is where individual researchers' work is defined and from whence the technical presentations to follow this presentation come. This overview also presents the Milestones accomplished to date and to be completed in the next year. Finally, the NASA Research Announcement cooperative agreement activities are covered and tied to the Tasks and Milestones.

  15. McClellan AFB, California, RI/FS Quality Assurance Project Plan. Installation Restoration Program (IRP) Stage 3.

    DTIC Science & Technology

    1992-08-07

    AD-A5 6 ... 1... . .. .. .... INSTALLATION RESTORATION PROGRAM (IRP) STAGE 3 7m~ QUALITY ASSURANCE -k- PROJECT PLAN for McCLELLAN AFB , CALIFORNIA...FINAL.. S AUG 2. 1 1992 L PREPARED FOR: .... ... McCLELLAN AFB IEM McCLELLAN AFB , CALIFORNIA 9652-599 ................... fr pu licrele se...PLAN FINAL ’’ : " FOR McCLELLAN AFB /EM McCLELLAN AFB , CALIFORNIA 95652-5990 August 1992 AUG 2 11992 PREPARED BY: DI Radian Corporation10389 Old

  16. Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals

    DTIC Science & Technology

    2000-04-01

    formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate

  17. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    PubMed

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  18. Intelligent transportation systems business plan for Kentucky : final report.

    DOT National Transportation Integrated Search

    2001-09-01

    This report presents a Business Plan for Intelligent Transportation Systems (ITS) in Kentucky. The purpose of the Business Plan is to define ITS projects that are planned for implementation from 2002 through 2007. The list of projects contained withi...

  19. 78 FR 28775 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY... a revision to the North Carolina State Implementation Plan submitted on February 3, 2010, through... particulate matter found in the Code of Federal Regulations. In the Final Rules Section of this Federal...

  20. Business planning health-check questionnaire: a survey of first, second, third and fourth wave NHS Trusts.

    PubMed

    Bennett, A R; Banks, J M

    1999-02-01

    This paper reports the results of primary research which was carried out in July 1995 with respect to business planning within first, second, third and fourth wave National Health Service (NHS) Trusts. The purpose of the research was to examine current practice in these Trusts in three areas--namely, the levels of responsibility for business planning in general, the business planning processes applied by these Trusts, and the tools and techniques used by business planning managers in the compilation of business plans. The research, based on a 37.5% response rate, concludes that, as a general rule, business planning in first, second, third and fourth wave NHS Trusts tends to be a board-level activity, where senior managers have a job title which reflects this function. Secondly, the research shows that by far the greatest challenge for Trusts lies in the external marketplace. In areas such as patient needs forecasting, competitive (Trust) intelligence, purchaser and general practice fundholder requirements, data are difficult to acquire. Finally, the evidence suggests that there is a significant gap between what is regarded as business planning practice in the NHS and what is actually applied as best practice. The report concludes that business planning in the NHS Trusts sampled appears to be an art rather than a science, and that many assumptions made by business planning managers are founded on qualitative information rather than on specific, measurable data derived from the external and internal market.

  1. 20 CFR 628.426 - Disapproval or revocation of the plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Disapproval or revocation of the plan. (a) If the Governor disapproves the SDA job training plan or plan... training plan or modification may be appealed by the PIC and chief elected official(s) of the SDA to the... and chief elected official(s) of the final disapproval of the SDA job training plan or modification...

  2. School travel plans: preliminary evidence for changing school-related travel patterns in elementary school children.

    PubMed

    Hinckson, Erica A; Badland, Hannah M

    2011-01-01

    In New Zealand, the School Travel Plan (STP) program was developed to increase school-related active travel rates and decrease traffic congestion. The plan was developed through collaboration among the school, community, and local council. The STP was tailored to each school's specific needs and incorporated educational initiatives, physical infrastructural changes in the vicinity of schools, and policy development. The purpose of this study was to determine the effectiveness of the STP program in changing school travel modes in children. Effectiveness was assessed by determining the difference between pre-STP and follow-up travel mode data in schools. The differences were assessed using multilinear regression analysis, including decile (measure of socioeconomic status), school roll at baseline, and STP year of implementation as predictors. Thirty-three elementary schools from the Auckland region participated in the study. School size ranged from 130 to 688 students. The final 2006 sample consisted of 13,631 students. On a set day (pre- and post-STP), students indicated their mode of transport to school and intended mode for returning home that day. Differences are reported as percentage points: there was an increase in active transport by 5.9% ± 6.8% when compared to baseline travel modes. School roll, STP year of implementation, and baseline values predicted engagement with active transport. Preliminary findings suggest that the STP program may be successful in creating mode shift changes to favor school-related active travel in elementary-school children.

  3. Fiscal Year 2012 Revegetation Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenifer Nordstrom

    2012-11-01

    This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achievedmore » final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.« less

  4. Health, Environment and Social Management in Enterprises programme in the Republic of Macedonia.

    PubMed

    Karadzinska-Bislimovska, Jovanka; Baranski, Boguslaw; Risteska-Kuc, Snezana

    2004-01-01

    Macedonia is the first country in the region to launch implementation of the WHO Health, Environment and Social Management in Enterprises (HESME) Programme, following the WHO Ministerial Conference on Environment and Health held in London in 1999. The aim of this paper is to describe the efforts made to implement this programme. Methods are based on integrated management with joint involvement of crucial partners at all levels of activities suggested by the WHO. Commitment to inter-sectorial and interagency collaboration at national level, adoption of a final version of a National HESME Plan, with basic principles, criteria and concrete activities, establishment of a National coordination center for the HESME Project, development of training curricula and specific educational tools for occupational health personnel, preparation of questionnaires and procedures for a national survey to detect high occupational risks, specific occupational hazards and health promotion needs of the working population, and finally setting up quantitative and qualitative indicators for national or provincial workplace health profiles. Building up the concept of cooperation, partnership and common work in HESME activities is a challenge for the new public health view in Europe.

  5. 78 FR 37126 - Approval and Promulgation of Implementation Plans; State of Kansas; Infrastructure SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of four Kansas State Implementation Plan... of proposed rulemaking for this action, which was published on April 17, 2013. DATES: This rule will... those portions in the April 17, 2013, proposed rule since they had already been acted upon by EPA. With...

  6. 78 FR 62455 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2013-0499; FRL-9901-35-Region3...: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to..., Associate Director, Office of Air Program Planning, Mailcode 3AP30, U.S. Environmental Protection Agency...

  7. 78 FR 57878 - Notice of Availability of the Proposed Bureau of Land Management Tres Rios Field Office and San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... and Resource Management Plan/Final Environmental Impact Statement AGENCY: Bureau of Land Management... Environmental Impact Statement (LRMP/Final EIS) for the San Juan Public Lands Planning Area in Colorado, and by... and woodlands; and other components of the biological, physical and cultural environment. Copies of...

  8. 77 FR 32022 - Direct Final Negative Declaration and Withdrawal of Large Municipal Waste Combustors State Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ... Negative Declaration and Withdrawal of Large Municipal Waste Combustors State Plan for Designated.... SUMMARY: EPA is taking direct final action to approve Illinois' negative declaration and request for EPA..., the state may submit a letter of certification to that effect, or a negative declaration, in lieu of a...

  9. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS, MODULE 3: SITE CHARACTERIZATION AND SAMPLING GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  10. 75 FR 6813 - Approval of Air Quality Implementation Plans; New Mexico; Albuquerque/Bernalillo County

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-11

    ...). ACTION: Direct final rule. SUMMARY: The EPA is approving revisions to the State Implementation Plan (SIP.... Background III. Summary of Changes to the New Mexico SIP IV. Final Action V. Statutory and Executive Order Reviews I. What Action Is EPA Taking? Today we are approving revisions to the New Mexico SIP, submitted by...

  11. 76 FR 62089 - General Management Plan/Abbreviated Final Environmental Impact Statement, New River Gorge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... Impact Statement for the General Management Plan (GMP/EIS) for New River Gorge National River, West..., and interpretation of park resources over the next 20 years. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets...

  12. 78 FR 23588 - Final Supplementary Rules for the Morley Nelson Snake River Birds of Prey National Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Conservation Area (NCA), addressed in the September 2008 Resource Management Plan (RMP) and Record of Decision... an array of management actions designed to conserve natural and cultural resources on BLM... analysis can be found in Chapter 4 of the Proposed Resource Management Plan and Final Environmental Impact...

  13. Pathways to Practice. A Series of Final Reports on the SREB Nursing Curriculum Project.

    ERIC Educational Resources Information Center

    Haase, Patricia T.

    Five final reports on the Nursing Curriculum Project of the Southern Regional Education Board are presented. The reports include (1) RN (Registered Nursing) Education: The Basic Issues; (2) Types of RN Programs; (3) Planning and Operating an RN Program; (4) Acclimating the Novice Nurse: Whose Responsibility? and (5) Statewide Planning for Nursing.…

  14. Examination of the Locus of Positional Effects on Children's Production of Plural -"s": Considerations from Local and Global Speech Planning

    ERIC Educational Resources Information Center

    Theodore, Rachel M.; Demuth, Katherine; Shattuck-Hufnagel, Stefanie

    2015-01-01

    Purpose: Prosodic and articulatory factors influence children's production of inflectional morphemes. For example, plural -"s" is produced more reliably in utterance-final compared to utterance-medial position (i.e., the positional effect), which has been attributed to the increased planning time in utterance-final position. In previous…

  15. Performance planning for rural planning organizations - final report.

    DOT National Transportation Integrated Search

    2017-02-01

    Recent federal rules place increased emphasis on performance-based management of the multimodal : transportation system and require the use of performance based methods in state, metropolitan, and : non-metropolitan transportation planning and progra...

  16. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  17. 324 Building B-Cell Pressurized Water Reactor Spent Fuel Packaging & Shipment RL Readiness Assessment Final Report [SEC 1 Thru 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HUMPHREYS, D C

    A parallel readiness assessment (RA) was conducted by independent Fluor Hanford (FH) and U. S. Department of Energy, Richland Operations Office (RL) team to verify that an adequate state of readiness had been achieved for activities associated with the packaging and shipping of pressurized water reactor fuel assemblies from B-Cell in the 324 Building to the interim storage area at the Canister Storage Building in the 200 Area. The RL review was conducted in parallel with the FH review in accordance with the Joint RL/FH Implementation Plan (Appendix B). The RL RA Team members were assigned a FH RA Teammore » counterpart for the review. With this one-on-one approach, the RL RA Team was able to assess the FH Team's performance, competence, and adherence to the implementation plan and evaluate the level of facility readiness. The RL RA Team agrees with the FH determination that startup of the 324 Building B-Cell pressurized water reactor spent nuclear fuel packaging and shipping operations can safely proceed, pending completion of the identified pre-start items in the FH final report (see Appendix A), completion of the manageable list of open items included in the facility's declaration of readiness, and execution of the startup plan to operations.« less

  18. Bag the gag rule. Poll indicates most Americans think global gag rule is wrong.

    PubMed

    Ernst, J; Farmer, A

    2000-09-01

    According to studies conducted by the Rand Corporation and the District of Columbia-based Center for Development and Population Activities, conservative and liberal Americans alike overwhelmingly support foreign assistance to international family planning programs. In addition, the 1998 poll shows that 92% of Americans believe that couples have the right to family planning, and a slight majority support government funding of legal overseas abortion services. Despite such evidence, members of the House Representative voted to restrict foreign family planning organizations that receive federal money from using their own non-US funds to provide abortion services overseas. To this effect, foreign family planning organizations and other concerned agencies argued that such a restriction undermines the objectives of the US and effectively denies access to desperately needed support to millions of women worldwide. In particular, organizations like the Center for Reproductive Law and Policy are lobbying lawmakers to strike the gag rule language from the final appropriations bill that will reach US President Clinton's desk, as well as to increase family planning funding levels. However, Clinton has indicated a veto if congress does pass gag rule legislation for the second year in a row.

  19. The Consensus Plan: Dutchess Community College, 1984-85.

    ERIC Educational Resources Information Center

    Donsky, Aaron P.; And Others

    This 1984-85 Consensus Plan for Dutchess Community College is the result of a comprehensive planning process characterized by three elements: (1) a cycle of departmental input directed by a voluntary planning committee and finalized by the deans and president; (2) an integrated process in which departmental plans reflect the major thrusts…

  20. Sentinel-1 data exploitation for geohazard activity map generation

    NASA Astrophysics Data System (ADS)

    Barra, Anna; Solari, Lorenzo; Béjar-Pizarro, Marta; Monserrat, Oriol; Herrera, Gerardo; Bianchini, Silvia; Crosetto, Michele; María Mateos, Rosa; Sarro, Roberto; Moretti, Sandro

    2017-04-01

    This work is focused on geohazard mapping and monitoring by exploiting Sentinel-1 (A and B) data and the DInSAR (Differential interferometric SAR (Synthetic Aperture Radar)) techniques. Sometimes the interpretation of the DInSAR derived product (like the velocity map) can be complex, mostly for a final user who do not usually works with radar. The aim of this work is to generate, in a rapid way, a clear product to be easily exploited by the authorities in the geohazard management: intervention planning and prevention activities. Specifically, the presented methodology has been developed in the framework of the European project SAFETY, which is aimed at providing Civil Protection Authorities (CPA) with the capability of periodically evaluating and assessing the potential impact of geohazards (volcanic activity, earthquakes, landslides and subsidence) on urban areas. The methodology has three phases, the interferograms generation, the activity map generation, in terms of velocity and accumulated deformation (with time-series), and the Active Deformation Area (ADA) map generation. The last one is the final product, derived from the original activity map by analyzing the data in a Geographic Information System (GIS) environment, which isolate only the true deformation areas over the noise. This product can be more easily read by the authorities than the original activity map, i.e. can be better exploited to integrate other information and analysis. This product also permit an easy monitoring of the active areas.

  1. Biomimetic materials in the utility industry: A program plan for research opportunities, volume 2. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Richman, R.H.; McNaughton, W.P.

    1996-09-01

    This report is the second of a two-volume set addressing the state-of-the-art and outlook for the application of biomimetic materials. The first volume examined achievements in mimicking novel aspects of biological systems in five broad categories: (1) Mimicking of Natural Material Designs, (2) Biomimetic Materials Processing, (3) Artificial Photosynthesis, (4) Biomimetic Molecular Electronics, and (5) Biomimetic Catalysis. Each topic was examined as to current activities and approaches, key aspects, unresolved issues, and implications for the power industry. Key researchers, their organizations, the main thrusts of investigation, achievements, and funding agencies were also summarized. This volume highlights opportunities for future researchmore » activities in biomimetics that could be valuable to the U.S. utility industry. Nineteen specific research projects have been identified. These opportunities are outlined in four classes: (1) technology awareness, (2) modeling and experimental studies, (3) state-of-the-art and outlook studies: developing experimental plans, and (4) concept feasibility studies.« less

  2. 75 FR 3680 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... the California State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION... Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These... are taking comments on this proposal and plan to follow with a final action. DATES: Any comments must...

  3. Developmental Cryogenic Active Telescope Testbed, a Wavefront Sensing and Control Testbed for the Next Generation Space Telescope

    NASA Technical Reports Server (NTRS)

    Leboeuf, Claudia M.; Davila, Pamela S.; Redding, David C.; Morell, Armando; Lowman, Andrew E.; Wilson, Mark E.; Young, Eric W.; Pacini, Linda K.; Coulter, Dan R.

    1998-01-01

    As part of the technology validation strategy of the next generation space telescope (NGST), a system testbed is being developed at GSFC, in partnership with JPL and Marshall Space Flight Center (MSFC), which will include all of the component functions envisioned in an NGST active optical system. The system will include an actively controlled, segmented primary mirror, actively controlled secondary, deformable, and fast steering mirrors, wavefront sensing optics, wavefront control algorithms, a telescope simulator module, and an interferometric wavefront sensor for use in comparing final obtained wavefronts from different tests. The developmental. cryogenic active telescope testbed (DCATT) will be implemented in three phases. Phase 1 will focus on operating the testbed at ambient temperature. During Phase 2, a cryocapable segmented telescope will be developed and cooled to cryogenic temperature to investigate the impact on the ability to correct the wavefront and stabilize the image. In Phase 3, it is planned to incorporate industry developed flight-like components, such as figure controlled mirror segments, cryogenic, low hold power actuators, or different wavefront sensing and control hardware or software. A very important element of the program is the development and subsequent validation of the integrated multidisciplinary models. The Phase 1 testbed objectives, plans, configuration, and design will be discussed.

  4. Building 9401-2 Plating Shop Surveillance and Maintenance Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1999-05-01

    This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes,more » and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S and M personnel; Provide an S and M plan which identifies and complies with applicable environmental, safety, and health safeguards and security requirements; and Provide a cost effective S and M program for the plating shop, Building 9401-2.« less

  5. Patient Protection and Affordable Care Act; standards related to essential health benefits, actuarial value and accreditation. Final rule.

    PubMed

    2013-02-25

    This final rule sets forth standards for health insurance issuers consistent with title I of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. Specifically, this final rule outlines Exchange and issuer standards related to coverage of essential health benefits and actuarial value. This rule also finalizes a timeline for qualified health plans to be accredited in Federally-facilitated Exchanges and amends regulations providing an application process for the recognition of additional accrediting entities for purposes of certification of qualified health plans.

  6. Land use-based landscape planning and restoration in mine closure areas.

    PubMed

    Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke

    2011-05-01

    Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.

  7. Final Report for Phase II Study: Prototyping the Sketch Planning Visualization Tool for Non-Motorized Travel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hwang, Ho-Ling; Wilson, Daniel W; Reuscher, Tim

    To further examine how factors such as those identified from the Phase I NMT study, and the modeling framework developed under that effort could be applied to local/regional level planning activities, FHWA decided to pursue a Phase II study. It was determined that a small geographic area with more detailed local data would be necessary. Although Washington D.C. was not one of the 2009 NHTS add-ons, it did conduct a household travel survey of 11,000 households in 2007-2008. The National Capital Region Transportation Planning Board at the Metropolitan Washington Council of Governments (MWCOG) conducted the household travel survey. The datamore » coverage under the MWCOG survey is much higher than that of the NHTS. As a part of the Phase II study, a prototype of a Geographic Information System (GIS)-based sketch planning visualization tool was also to be developed. The intent was to use a neighborhood in the Washington D.C. region as a case study for this prototype application.« less

  8. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  9. The Evolution of U.S. Strategic Command and Control and Warning, 1945-1972,

    DTIC Science & Technology

    1975-06-01

    steps were taken in these years to ration - alize the command and control structure. These efforts were in part inspired by the poor performance of...Secretary of the NSC finally submitted a report (NSC 30) to the NSC on "US Policy on Atomic Warfare." It dealt with the feasibility of formulating at...1950, plans were formulated for the con- struction and activation of the Strategic Operational Control System (SOCS). This net made use of a

  10. X-45A Air Vehicle #1 during flight #13, with weapons bay door open

    NASA Image and Video Library

    2003-02-21

    The DARPA/U.S. Air Force X-45A Unmanned Combat Air Vehicle (UCAV) system demonstration program completed the first phase of demonstrations, known as Block I, on Feb. 28, 2003. The final Block I activities included two flights at Dryden, during which safe operation of the weapons bay door was verified at 35,000 feet and speeds of Mach 0.75, the maximum planned altitude and speed for the two X-45A demonstrator vehicles.

  11. Focused Feasibility Study Final Health and Safety Plan. Beach Point Test Site, Aberdeen Proving Ground, Edgewood Area, Maryland.

    DTIC Science & Technology

    1993-10-01

    brimmed hats can help prevent sunburn. Chronic exposure to UV radiation is known to cause skin cancer. In case of sunburn, do not apply burn ointment ...personnel who have the potential to be exposed to hazardous or toxic substances or environments during the course of field activities. Each member of the...investigations who are exposed or potentially exposed to hazardous substances or health hazards at or above the established exposure levels for these substances

  12. Final Environmental Assessment for Implementation of Proposed Actions in the Moody Air Force Base Integrated Natural Resources Management Plan (INRMP)

    DTIC Science & Technology

    2015-09-01

    e.g., white-tailed deer, eastern wild turkey, small game) and game fish , and generally consists of activities related to consumptive uses of these...Grassy Pond Lake for eagles, including the control of invasive aquatic species and periodic restocking of forage fish . The overall effect of this...management concerns obtained from cooperating agencies· (i.e., the U.S. Fish and Wildlife Service and Georgia Deparbnent of Natural Resources), the military

  13. Advanced exterior sensor project : final report, September 2004.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashby, M. Rodema

    2004-12-01

    This report (1) summarizes the overall design of the Advanced Exterior Sensor (AES) system to include detailed descriptions of system components, (2) describes the work accomplished throughout FY04 to evaluate the current health of the original prototype and to return it to operation, (3) describes the status of the AES and the AES project as of September 2004, and (4) details activities planned to complete modernization of the system to include development and testing of the second-generation AES prototype.

  14. High-speed microprocessor characterization. Final report/project accomplishments summary, CRADA Number KCP-94-1004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, L.W.

    The objective of the project was to characterize and document the critical operating parameters of an 0.8-micron, 350-MHz, 32-bit microprocessor prototype. The roles of FM and T and the participant company were: FM and T -- evaluation performance of the prototype 32-bit microprocessor using the IDS5000 and Tektronix S3260 Integrated Circuit Test System; Corda -- design and build the prototype microprocessor. This project was terminated with nearly all of the planned activities unaddressed.

  15. Fourth international circumpolar arctic vegetation mapping workshop

    USGS Publications Warehouse

    Raynolds, Martha K.; Markon, C.J.

    2002-01-01

    During the week of April 10, 2001, the Fourth International Circumpolar Arctic Vegetation Mapping Workshop was held in Moscow, Russia. The purpose of this meeting was to bring together the vegetation scientists working on the Circumpolar Arctic Vegetation Map (CAVM) to (1) review the progress of current mapping activities, (2) discuss and agree upon a standard set of arctic tundra subzones, (3) plan for the production and dissemination of a draft map, and (4) begin work on a legend for the final map.

  16. Preparation of Neo-Literate Materials for Rural Development. Final Report of a Regional Workshop on the Preparation of Literacy Follow-Up Materials in Asia and the Pacific (6th, Kuching, Sarawak, Malaysia, September 21-30, 1988).

    ERIC Educational Resources Information Center

    Asian Cultural Centre for UNESCO, Tokyo (Japan).

    The proceedings of the sixth regional workshop consist of a description of the project and the workshop; a description of the field survey, preparation, and field testing of materials by the group; five papers presented at the workshop; and notes on planned follow-up activities in the participating countries. The workshop culminated a project on…

  17. Standby gasoline rationing plan

    DOT National Transportation Integrated Search

    1980-06-01

    Title 10 - Energy, Chapter II - Department of Energy, PART 570 - Standby gasoline rationing plan regulations. Final rules adopted by the President for a Standby Gasoline Rationing Plan required by the Energy Policy and Conservation Act of 1979 (P.L. ...

  18. Mathematic model of regional economy development by the final result of labor resources

    NASA Astrophysics Data System (ADS)

    Zaitseva, Irina; Malafeev, Oleg; Strekopytov, Sergei; Bondarenko, Galina; Lovyannikov, Denis

    2018-04-01

    This article presents the mathematic model of regional economy development based on the result of labor resources. The solution of a region development-planning problem is considered for the period of long-lasting planning taking into account the beginning and the end of the planned period. The challenge is to find the distribution of investments in the main and additional branches of the regional economy, which will provide simultaneous transaction of all major sectors of the regional economy from the given condition to the predetermined final state.

  19. 76 FR 37207 - Group Health Plans and Health Insurance Issuers: Rules Relating to Internal Claims and Appeals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ...This document contains amendments to interim final regulations implementing the requirements regarding internal claims and appeals and external review processes for group health plans and health insurance coverage in the group and individual markets under provisions of the Affordable Care Act. These rules are intended to respond to feedback from a wide range of stakeholders on the interim final regulations and to assist plans and issuers in coming into full compliance with the law through an orderly and expeditious implementation process.

  20. 78 FR 2655 - Uinta-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ...-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project AGENCY: Forest Service, USDA. ACTION... prepare a supplement to the Ogden Travel Plan Revision Final Supplemental Environmental Impact Statement (FSEIS). The Ogden Travel Plan Revision FSEIS evaluated six alternatives for possible travel management...

  1. 78 FR 60099 - Nontank Vessel Response Plans and Other Response Plan Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Convention for the Prevention of Pollution From Ships MEPC Marine Environment Protection Committee NAICS... vessels to prepare and submit oil spill response plans. The Federal Water Pollution Control Act defines.... Additionally, this final rule updates the international Shipboard Oil Pollution Emergency Plan requirements...

  2. 78 FR 68005 - Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... this Federal Register, EPA is approving the State's implementation plan revision as a direct final rule...] Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP--Memorandum... proposing to approve a State Implementation Plan revision submitted by the Mississippi Department of...

  3. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meachammore » Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).« less

  4. Determination of State Budgets for the Final Ozone Supplemental of the Transport Rule TSD

    EPA Pesticide Factsheets

    In this final rulemaking, EPA finalizes Federal Implementation Plans (FIPs) to address significant contribution to nonattainment and interference with maintenance in Iowa, Michigan, Missouri, Oklahoma, and Wisconsin.

  5. CSAPR Direct Final Rule (77 FR 10342)

    EPA Pesticide Factsheets

    EPA takes direct final action on additional revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals published August 8, 2011).

  6. 77 FR 54922 - Record of Decision for the General Management Plan/Final Environmental Impact Statement, Hampton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ...: Pursuant to 102 (2)(c) of the National Environmental Policy Act of 1969 (NEPA), the National Park Service (NPS) announces the availability of the Record of Decision for the Final General Management Plan and... to include the entire story of the park, from its beginnings in the 18th century to its heyday in the...

  7. 78 FR 28051 - Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed On or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ...This action finalizes amendments to the federal plan and the new source performance standards for hospital/medical/infectious waste incinerators. This final action implements national standards promulgated in the 2009 amendments to the hospital/medical/infectious waste incinerator emissions guidelines that will result in reductions in emissions of certain pollutants from all affected units.

  8. 77 FR 29682 - Gulf of Mexico, Outer Continental Shelf, Central Planning Area, Oil and Gas Lease Sale 216/222

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... and Gas Lease Sale: 2012 Central Planning Area (CPA) Lease Sale 216/222 Authority: This NOA is... a ROD following the completion of the Final SEIS for CPA Consolidated Lease Sale 216/222, the final... SEIS updates two previous environmental and socioeconomic analyses for CPA Lease Sale 216/222. The GOM...

  9. Task Analysis and Descriptions of Required Job Competencies for Robotics/Automated Systems Technicians. Final Report. Volume 2. Curriculum Planning Guide.

    ERIC Educational Resources Information Center

    Hull, Daniel M.; Lovett, James E.

    This volume of the final report for the Robotics/Automated Systems Technician (RAST) curriculum project is a curriculum planning guide intended for school administrators, faculty, and student counselors/advisors. It includes step-by-step procedures to help institutions evaluate their community's needs and their capabilities to meet these needs in…

  10. 76 FR 62824 - Notice of Final Supplementary Rules for Public Lands in Colorado: Bangs Canyon Special Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... Management Area Management Plan (BCSRMAMP) and the Grand Junction Resource Management Plan (GJRMP). These... 43 U.S.C. 1740, 43 U.S.C. 315a, and 43 CFR 8365.1-6 II. Background Recreation resource management... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCON03000-L12200000-PA0000] Notice of Final...

  11. Active Combustion Control for Aircraft Gas Turbine Engines

    NASA Technical Reports Server (NTRS)

    DeLaat, John C.; Breisacher, Kevin J.; Saus, Joseph R.; Paxson, Daniel E.

    2000-01-01

    Lean-burning combustors are susceptible to combustion instabilities. Additionally, due to non-uniformities in the fuel-air mixing and in the combustion process, there typically exist hot areas in the combustor exit plane. These hot areas limit the operating temperature at the turbine inlet and thus constrain performance and efficiency. Finally, it is necessary to optimize the fuel-air ratio and flame temperature throughout the combustor to minimize the production of pollutants. In recent years, there has been considerable activity addressing Active Combustion Control. NASA Glenn Research Center's Active Combustion Control Technology effort aims to demonstrate active control in a realistic environment relevant to aircraft engines. Analysis and experiments are tied to aircraft gas turbine combustors. Considerable progress has been shown in demonstrating technologies for Combustion Instability Control, Pattern Factor Control, and Emissions Minimizing Control. Future plans are to advance the maturity of active combustion control technology to eventual demonstration in an engine environment.

  12. Formacion de Formadores en Planeamiento y Administracion de la Education: Informe Final. Reunion Tecnica de la Red REPLAD, Campinas, Sao Paulo, Brasil, 9-13 de noviembre de 1987. (Educational Development of Professionals in Educational Planning and Administration: Final Report. Proceedings of the Meeting of the Major Project for Education (Sao Paulo, Brazil, November 9-13, 1987).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and the Caribbean.

    This final report provides a synthesis of conference presentations by representatives from institutions in 17 Latin American and the Caribbean nations. The material includes descriptions about institutions of higher education planning and developing of their respective schools of education, ministries of education, and national and regional…

  13. Patient Protection and Affordable Care Act; establishment of exchanges and qualified health plans; Small Business Health Options Program. Final rule.

    PubMed

    2013-06-04

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act) related to the Small Business Health Options Program (SHOP). Specifically, this final rule amends existing regulations regarding triggering events and special enrollment periods for qualified employees and their dependents and implements a transitional policy regarding employees' choice of qualified health plans (QHPs) in the SHOP.

  14. Prospective feasibility trial of radiotherapy target definition for head and neck cancer using 3-dimensional PET and CT imaging.

    PubMed

    Scarfone, Christopher; Lavely, William C; Cmelak, Anthony J; Delbeke, Dominique; Martin, William H; Billheimer, Dean; Hallahan, Dennis E

    2004-04-01

    The aim of this investigation was to evaluate the influence and accuracy of (18)F-FDG PET in target volume definition as a complementary modality to CT for patients with head and neck cancer (HNC) using dedicated PET and CT scanners. Six HNC patients were custom fitted with head and neck and upper body immobilization devices, and conventional radiotherapy CT simulation was performed together with (18)F-FDG PET imaging. Gross target volume (GTV) and pathologic nodal volumes were first defined in the conventional manner based on CT. A segmentation and surface-rendering registration technique was then used to coregister the (18)F-FDG PET and CT planning image datasets. (18)F-FDG PET GTVs were determined and displayed simultaneously with the CT contours. CT GTVs were then modified based on the PET data to form final PET/CT treatment volumes. Five-field intensity-modulated radiation therapy (IMRT) was then used to demonstrate dose targeting to the CT GTV or the PET/CT GTV. One patient was PET-negative after induction chemotherapy. The CT GTV was modified in all remaining patients based on (18)F-FDG PET data. The resulting PET/CT GTV was larger than the original CT volume by an average of 15%. In 5 cases, (18)F-FDG PET identified active lymph nodes that corresponded to lymph nodes contoured on CT. The pathologically enlarged CT lymph nodes were modified to create final lymph node volumes in 3 of 5 cases. In 1 of 6 patients, (18)F-FDG-avid lymph nodes were not identified as pathologic on CT. In 2 of 6 patients, registration of the independently acquired PET and CT data using segmentation and surface rendering resulted in a suboptimal alignment and, therefore, had to be repeated. Radiotherapy planning using IMRT demonstrated the capability of this technique to target anatomic or anatomic/physiologic target volumes. In this manner, metabolically active sites can be intensified to greater daily doses. Inclusion of (18)F-FDG PET data resulted in modified target volumes in radiotherapy planning for HNC. PET and CT data acquired on separate, dedicated scanners may be coregistered for therapy planning; however, dual-acquisition PET/CT systems may be considered to reduce the need for reregistrations. It is possible to use IMRT to target dose to metabolically active sites based on coregistered PET/CT data.

  15. Dose as a Tool for Planning and Implementing Community-Based Health Strategies.

    PubMed

    Kuo, Elena S; Harner, Lisa T; Frost, Madeline C; Cheadle, Allen; Schwartz, Pamela M

    2018-05-01

    A major challenge in community-based health promotion is implementing strategies that could realistically improve health at the population level. Population dose methodology was developed to help understand the combined impact of multiple strategies on population-level health behaviors. This paper describes one potential use of dose: as a tool for working collaboratively with communities to increase impact when planning and implementing community-level initiatives. Findings are presented from interviews conducted with 11 coordinators who used dose for planning and implementing local efforts with community coalitions. During early-stage planning, dose was used as a tool for strategic planning, and as a framework to build consensus among coalition partners. During implementation, a dose lens was used to revise strategies to increase their reach (the number of people exposed to the intervention) or strength (the relative change in behavior for each exposed person) to create population-level impact. A case study is presented, illustrating how some community coalitions and evaluators currently integrate dose into the planning and implementation of place-based healthy eating and active living strategies. Finally, a planning checklist was developed for program coordinators and evaluators. This article is part of a supplement entitled Building Thriving Communities Through Comprehensive Community Health Initiatives, which is sponsored by Kaiser Permanente, Community Health. Copyright © 2018 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  16. 75 FR 34537 - Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... 45 CFR Part 147 Group Health Plans and Health Insurance Coverage Relating to Status as a... for Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan... group health plans and health insurance coverage in the group and individual markets under provisions of...

  17. Care Planning, Quality Assurance, and Personnel Management in Long-Term Care Facilities. Final Report.

    ERIC Educational Resources Information Center

    Patchner, Michael A.; Balgopal, Pallassana R.

    Three studies were undertaken to examine topics of care planning, personnel management, and quality assurance in long-term care facilities. The first study examined the formulation and implementation processes of care planning for nursing home residents. The exemplary homes' care planning included the existence of strong care planning leadership,…

  18. South Dakota ITS/CVO business plan : final business plan

    DOT National Transportation Integrated Search

    1998-01-18

    This report defines an Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) program for the State of South Dakota. Structured as a business plan, the document includes the following components: 1) description of the current CVO ...

  19. Integrating climate change into the transportation planning process : final report

    DOT National Transportation Integrated Search

    2008-07-01

    The objective of this study is to advance the practice and application of transportation planning among state, regional, and local transportation planning agencies to successfully meet growing concerns about the relationship between transportation an...

  20. Graduate certificate in transportation planning : final report

    DOT National Transportation Integrated Search

    2008-12-12

    The purpose of this project was to develop and implement a graduate Certificate in Transportation Planning at Texas : A&M University. Texas A&M currently offers instruction in transportation through its Masters of Urban Planning and : Civil Engineeri...

  1. Employee Retirement Income Security Act of 1974: rules and regulations for administration and enforcement; claims procedure. Pension and Welfare Benefits Administration, Labor. Final regulation.

    PubMed

    2000-11-21

    This document contains a final regulation revising the minimum requirements for benefit claims procedures of employee benefit plans covered by Title I of the Employee Retirement Income Security Act of 1974 (ERISA or the Act). The regulation establishes new standards for the processing of claims under group health plans and plans providing disability benefits and further clarifies existing standards for all other employee benefit plans. The new standards are intended to ensure more timely benefit determinations, to improve access to information on which a benefit determination is made, and to assure that participants and beneficiaries will be afforded a full and fair review of denied claims. When effective, the regulation will affect participants and beneficiaries of employee benefit plans, employers who sponsor employee benefit plans, plan fiduciaries, and others who assist in the provision of plan benefits, such as third-party benefits administrators and health service providers or health maintenance organizations that provide benefits to participants and beneficiaries of employee benefit plans.

  2. Patient Protection and Affordable Care Act; HHS Notice of Benefit and Payment Parameters for 2018; Amendments to Special Enrollment Periods and the Consumer Operated and Oriented Plan Program. Final rule.

    PubMed

    2016-12-22

    This final rule sets forth payment parameters and provisions related to the risk adjustment program; cost-sharing parameters and cost-sharing reductions; and user fees for Federally-facilitated Exchanges and State-based Exchanges on the Federal platform. It also provides additional guidance relating to standardized options; qualified health plans; consumer assistance tools; network adequacy; the Small Business Health Options Programs; stand-alone dental plans; fair health insurance premiums; guaranteed availability and guaranteed renewability; the medical loss ratio program; eligibility and enrollment; appeals; consumer-operated and oriented plans; special enrollment periods; and other related topics.

  3. [Endodontically treated teeth. Success--failure. Endorestorative treatment plan].

    PubMed

    Zabalegui, B

    1990-01-01

    More and more often the general dentist is finding the presence of endodontically treated teeth during his treatment planning procedure. He has to ask himself if the endo-treated tooth functions and will continue to function function successfully, when deciding which final endo-restorative procedure to apply. For this reason the dentist or the endodontist with whom he works should clinically evaluate these teeth, establish a diagnostic criteria of their success or failure and a treatment plan according to the prognosis. The purpose of this article is to offer an organized clinical view of the steps to follow when evaluating an endodontically treated tooth and how to establish a final endo-restorative plan.

  4. 75 FR 55973 - Salvage and Marine Firefighting Requirements; Vessel Response Plans for Oil

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... and Marine Firefighting Requirements; Vessel Response Plans for Oil AGENCY: Coast Guard, DHS. ACTION... the vessel response plan salvage and marine firefighting requirements for tank vessels carrying oil... Marine Firefighting Requirements; Vessel Response Plans for Oil'' (73 FR 80618). The final rule amended...

  5. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  6. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  7. 78 FR 78310 - Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... Federal Register, EPA is approving the State's implementation plan revision as a direct final rule without...] Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity Memorandum of... Implementation Plan submitted on July 12, 2013, through the North Carolina Department of Environment and Natural...

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frenkel, G.; Paterson, T.S.; Smith, M.E.

    The Institute for Defense Analyses (IDA) has collected and analyzed information on battle management algorithm technology that is relevant to Battle Management/Command, Control and Communications (BM/C3). This Memorandum Report represents a program plan that will provide the BM/C3 Directorate of the Strategic Defense Initiative Organization (SDIO) with administrative and technical insight into algorithm technology. This program plan focuses on current activity in algorithm development and provides information and analysis to the SDIO to be used in formulating budget requirements for FY 1988 and beyond. Based upon analysis of algorithm requirements and ongoing programs, recommendations have been made for research areasmore » that should be pursued, including both the continuation of current work and the initiation of new tasks. This final report includes all relevant material from interim reports as well as new results.« less

  9. 77 FR 2993 - Final Environmental Impact Statement and Record of Decision on Oncor Electric Delivery Company's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ...-FF02ENEH00] Final Environmental Impact Statement and Record of Decision on Oncor Electric Delivery Company's... the final environmental impact statement (EIS), and final record of decision under the National... implementation of the final Oncor Electric Delivery LLC's Habitat Conservation Plan (HCP). Our decision is to...

  10. Prioritizing and Funding Nepal's Multisector Nutrition Plan.

    PubMed

    Pomeroy-Stevens, Amanda; Shrestha, Madhukar B; Biradavolu, Monica; Hachhethu, Kusum; Houston, Robin; Sharma, Indu; Wun, Jolene

    2016-12-01

    Nepal has a long tradition of designing good multisectoral nutrition policy. However, success of policy implementation has varied. More evidence on how to successfully carry out multisector nutrition policy is needed. We tracked the influence of Nepal's multisectoral nutrition plan (MSNP) on the process of priority setting and budgeting from 2014 to 2016. This study used a mixed-method longitudinal design to track qualitative and budgetary changes related to MSNP processes nationally as well as in 3 districts. Qualitative changes in each study area were assessed through interviews, observation, news content, and meeting notes. Changes in allocations and expenditures were calculated based on budget documents, work plans, and validation interviews. Improved understanding of the MSNP was documented nationally and in study districts but not in VDCs. Human resources, ownership, bottom-up planning, coordination, advocacy, and sustainable structures all emerged as important factors within the enabling environment. Evidence suggests the MSNP influenced improvements in the last 3 factors. We also found notable increases in activities and financing for nutrition-allocations increased steadily between FY 2013-2014 and FY 2015-2016, and 28% of total nutrition allocations in the final year came from new or expanded MSNP-affiliated activities. Data from 3 districts highlight challenges linking local planning and budgeting to central-level structures. The MSNP appears to have strengthened the nutrition system in Nepal and increased priority and funding for nutrition. Next steps include strengthening linkages to the districts and below. Other countries can learn from the MSNP's success in increasing investment for nutrition. © The Author(s) 2016.

  11. Louisiana's 2017 Master Plan for a Sustainable Coast

    NASA Astrophysics Data System (ADS)

    Haase, B.

    2017-12-01

    The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement

  12. Review of the Draft 2014 Science Mission Directorate Science Plan

    NASA Technical Reports Server (NTRS)

    2013-01-01

    At the request of NASA's Science Mission Directorate (SMD), the National Research Council's (NRC's) Space Studies Board (SSB) initiated a study to review a draft of the SMD's 2014 Science Plan. The request for this review was made at a time when NASA is engaged in the final stages of a comprehensive, agency-wide effort to develop a new strategic plan and at a time when NASA's budget is under considerable stress. SMD's Science Plan serves to provide more detail on its four traditional science disciplines-astronomy and astrophysics, solar and space physics (also called heliophysics), planetary science, and Earth remote sensing and related activities-than is possible in the agency-wide Strategic Plan. In conducting its review of the draft Science Plan, the Committee on the Assessment of the NASA Science Mission Directorate 2014 Science Plan was charged to comment on the following specific areas: (1) Responsiveness to the NRC's guidance on key science issues and opportunities in recent NRC reports; (2) Attention to interdisciplinary aspects and overall scientific balance; (3) Identification and exposition of important opportunities for partnerships as well as education and public outreach; (4) Integration of technology development with the science program; (5) Clarity on how the plan aligns with SMD's strategic planning process; (6) General readability and clarity of presentation; and (7) Other relevant issues as determined by the committee. The main body of the report provides detailed findings and recommendations relating to the draft Science Plan. The highest-level, crosscutting issues are summarized here, and more detail is available in the main body of the report.

  13. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... include the value and size of the modification and the comparative value and size of the final product...

  14. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... minor include the value and size of the modification and the comparative value and size of the final...

  15. Miami Valley ITS : early deployment plan : final ITS strategic deployment plan

    DOT National Transportation Integrated Search

    1997-09-01

    This report presents the Strategic Deployment Plan for Intelligent Transportation Systems (ITS) in Clark, Greene, Miami and Montgomery Counties, Ohio (the Miami Valley). The report summarizes the steps that were performed in preparing the Strat...

  16. Evaluating the distributional effects of regional transportation plans and projects : final report.

    DOT National Transportation Integrated Search

    2017-05-01

    Metropolitan planning organizations (MPOs) have long been required to consider the equity implications of their regional transportation plans and processes. Funded by the National Institute for Transportation and Communities, this research aims to pr...

  17. Transit bus stop pedestrian warning application : acceptance test plan : final report.

    DOT National Transportation Integrated Search

    2016-10-14

    This document is the Acceptance Test Plan for the Transit Bus Stop Pedestrian Warning (TSPW) application. This report describes the test and demonstration plan to verify that the application meets its functional and performance requirements.

  18. Integrating intelligent transportation systems within the transportation planning process : an interim handbook.

    DOT National Transportation Integrated Search

    1998-01-01

    The Final Rule on Statewide Planning and Metropolitan Planning issued by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) in October, 1993 established revised and more comprehensive processes for metropolitan and sta...

  19. Metropolitan planning organizations in Texas : overview and profiles : final report.

    DOT National Transportation Integrated Search

    2017-04-01

    A metropolitan planning organization (MPO) has authority and responsibility for regional transportation planning in urbanized areas where the population is at least 50,000 and surrounding areas meet size/density criteria determined by the U.S. Census...

  20. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... Planning, Environmental Impact Analysis, and Decision- making), the NPS announces the availability of a... National Park Service will execute a Record of Decision (ROD) no sooner than 30 days following publication...

  1. Incentives for nondiscriminatory wellness programs in group health plans. Final rule.

    PubMed

    2013-06-03

    This document contains final regulations, consistent with the Affordable Care Act, regarding nondiscriminatory wellness programs in group health coverage. Specifically, these final regulations increase the maximum permissible reward under a health-contingent wellness program offered in connection with a group health plan (and any related health insurance coverage) from 20 percent to 30 percent of the cost of coverage. The final regulations further increase the maximum permissible reward to 50 percent for wellness programs designed to prevent or reduce tobacco use. These regulations also include other clarifications regarding the reasonable design of health-contingent wellness programs and the reasonable alternatives they must offer in order to avoid prohibited discrimination.

  2. The EPOS Architecture: Integrated Services for solid Earth Science

    NASA Astrophysics Data System (ADS)

    Cocco, Massimo; Consortium, Epos

    2013-04-01

    The European Plate Observing System (EPOS) represents a scientific vision and an IT approach in which innovative multidisciplinary research is made possible for a better understanding of the physical processes controlling earthquakes, volcanic eruptions, unrest episodes and tsunamis as well as those driving tectonics and Earth surface dynamics. EPOS has a long-term plan to facilitate integrated use of data, models and facilities from existing (but also new) distributed research infrastructures, for solid Earth science. One primary purpose of EPOS is to take full advantage of the new e-science opportunities coming available. The aim is to obtain an efficient and comprehensive multidisciplinary research platform for the Earth sciences in Europe. The EPOS preparatory phase (EPOS PP), funded by the European Commission within the Capacities program, started on November 1st 2010 and it has completed its first two years of activity. EPOS is presently mid-way through its preparatory phase and to date it has achieved all the objectives, milestones and deliverables planned in its roadmap towards construction. The EPOS mission is to integrate the existing research infrastructures (RIs) in solid Earth science warranting increased accessibility and usability of multidisciplinary data from monitoring networks, laboratory experiments and computational simulations. This is expected to enhance worldwide interoperability in the Earth Sciences and establish a leading, integrated European infrastructure offering services to researchers and other stakeholders. The Preparatory Phase aims at leveraging the project to the level of maturity required to implement the EPOS construction phase, with a defined legal structure, detailed technical planning and financial plan. We will present the EPOS architecture, which relies on the integration of the main outcomes from legal, governance and financial work following the strategic EPOS roadmap and according to the technical work done during the first two years in order to establish an effective implementation plan guaranteeing long term sustainability for the infrastructure and the associated services. We plan to describe the RIs to be integrated in EPOS and to illustrate the initial suite of integrated and thematic core services to be offered to the users. We will present examples of combined data analyses and we will address the importance of opening our research infrastructures to users from different communities. We will describe the use-cases identified so far in order to allow stakeholders and potential future users to understand and interact with the EPOS infrastructure. In this framework, we also discuss the global perspectives for data infrastructures in order to verify the coherency of the EPOS plans and present the EPOS contributions. We also discuss the international cooperation initiatives in which EPOS is involved emphasizing the implications for solid Earth data infrastructures. In particular, EPOS and the satellite Earth Observation communities are collaborating in order to promote the integration of data from in-situ monitoring networks and satellite observing systems. Finally, we will also discuss the priorities for the third year of activity and the key actions planned to better involve users in EPOS. In particular, we will discuss the work done to finalize the design phase as well as the activities to start the validation and testing phase of the EPOS infrastructure.

  3. Thai-Alberta Co-Operative Assessment Project Concerning Thirty-Two Rural Secondary Schools in the Third National Economic and Social Plan, Thailand (1972-1976). Final Report.

    ERIC Educational Resources Information Center

    Chareonchai, Ruang; And Others

    This extensive assessment project report focuses on the Rural Secondary Schools (RSS) Project in Thailand. The background, design, rationale and objectives of the assessment are described, as are the eight phases of the study: reconnaissance; proposals; basic planning and pre-testing; data collection; analysis; academic review; final report; and…

  4. Science and Observation Recommendations for Future NASA Carbon Cycle Research

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Collatz, G. J.; Kawa, S. R.; Gregg, W. W.; Gervin, J. C.; Abshire, J. B.; Andrews, A. E.; Behrenfeld, M. J.; Demaio, L. D.; Knox, R. G.

    2002-01-01

    Between October 2000 and June 2001, an Agency-wide planning, effort was organized by elements of NASA Goddard Space Flight Center (GSFC) to define future research and technology development activities. This planning effort was conducted at the request of the Associate Administrator of the Office of Earth Science (Code Y), Dr. Ghassem Asrar, at NASA Headquarters (HQ). The primary points of contact were Dr. Mary Cleave, Deputy Associate Administrator for Advanced Planning at NASA HQ (Headquarters) and Dr. Charles McClain of the Office of Global Carbon Studies (Code 970.2) at GSFC. During this period, GSFC hosted three workshops to define the science requirements and objectives, the observational and modeling requirements to meet the science objectives, the technology development requirements, and a cost plan for both the science program and new flight projects that will be needed for new observations beyond the present or currently planned. The plan definition process was very intensive as HQ required the final presentation package by mid-June 2001. This deadline was met and the recommendations were ultimately refined and folded into a broader program plan, which also included climate modeling, aerosol observations, and science computing technology development, for contributing to the President's Climate Change Research Initiative. This technical memorandum outlines the process and recommendations made for cross-cutting carbon cycle research as presented in June. A separate NASA document outlines the budget profiles or cost analyses conducted as part of the planning effort.

  5. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into amore » 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.« less

  6. Euro 2012 European Football Championship Finals: planning for a health legacy.

    PubMed

    Smallwood, Catherine A H; Arbuthnott, Katherine G; Banczak-Mysiak, Barbara; Borodina, Mariya; Coutinho, Ana Paula; Payne-Hallström, Lara; Lipska, Elzbieta; Lyashko, Viktor; Miklasz, Miroslaw; Miskiewicz, Paulina; Nitzan, Dorit; Pokanevych, Igor; Posobkiewicz, Marek; Rockenschaub, Gerald; Sadkowska-Todys, Malgorzata; Sinelnik, Svetlana; Smiley, Daniel; Tomialoic, Rysard; Yurchenko, Volodimir; Memish, Ziad A; Heymann, David; Endericks, Tina; McCloskey, Brian; Zumla, Alimuddin; Barbeschi, Maurizio

    2014-06-14

    The revised international health regulations offer a framework that can be used by host countries to organise public health activities for mass gatherings. From June 8, to July 1, 2012, Poland and Ukraine jointly hosted the Union of European Football Associations European Football Championship Finals (Euro 2012). More than 8 million people from around the world congregated to watch the games. Host countries and international public health agencies planned extensively to assess and build capacity in the host countries and to develop effective strategies for dissemination of public health messages. The effectiveness of public health services was maximised through rapid sharing of information between parties, early use of networks of experienced individuals, and the momentum of existing national health programmes. Organisers of future mass gatherings for sporting events should share best practice and their experiences through the WHO International Observer Program. Research about behaviour of large crowds is needed for crowd management and the evidence base translated into practice. A framework to measure and evaluate the legacy of Euro 2012 is needed based on the experiences and the medium-term and long-term benefits of the tournament. Copyright © 2014 Elsevier Ltd. All rights reserved.

  7. Magnetic Earth Ionosphere Resonant Frequencies (MEIRF) project

    NASA Technical Reports Server (NTRS)

    Spaniol, Craig

    1993-01-01

    The West Virginia State College Community College Division NASA Magnetic Earth Ionosphere Resonant Frequencies (MEIRF) study is described. During this contract period, the two most significant and professionally rewarding events were the presentation of the research activity at the Sir Isaac Newton Conference in St. Petersburg, Russia, and the second Day of Discovery Conference, focusing on economic recovery in West Virginia. An active antenna concept utilizing a signal feedback principle similar to regenerative receivers used in early radio was studied. The device has potential for ELF research and other commercial applications for improved signal reception. Finally, work continues to progress on the development of a prototype monitoring station. Signal monitoring, data display, and data storage are major areas of activity. In addition, we plan to continue our dissemination of research activity through presentations at seminars and other universities.

  8. Comprehensive plan amendment impacts on interchanges in Oregon : final report.

    DOT National Transportation Integrated Search

    2005-09-01

    This report examines the effects of amendments to local comprehensive plans on interchange performance on the Oregon highway system. Plan amendments over a 15-year period in Oregon, resulting in changes to industrial or commercial land use, were revi...

  9. MnDOT Library strategic plan : final report.

    DOT National Transportation Integrated Search

    2017-06-01

    MnDOTs Senior Leadership asked MnDOT Library to develop a Strategic Plan that identifies and reviews the challenges facing the Library over the next five years to better address the evolving needs of the department and users. The strategic plan is...

  10. 78 FR 41694 - Final Priority and Requirements; Education Facilities Clearinghouse

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... the collection and dissemination of best practices for the planning, design, financing, procurement... Facilities Clearinghouse program is to provide technical assistance and training on the planning, design... dissemination of best practices for the planning, design, financing, procurement, construction, improvement...

  11. Retention of Knowledge in Clinical Biochemistry and the Effect of the Keller Plan.

    ERIC Educational Resources Information Center

    Schwartz, Peter L.

    1981-01-01

    A controlled trial of teaching clinical biochemistry by the Keller Plan at the University of Otago Medical School is described. The Keller Plan group performed significantly better than the control group on the final examination. (MLW)

  12. Interim guidance for implementing SAFETEA-LU provisions on planning, environment, and air quality for FHWA authorities

    DOT National Transportation Integrated Search

    2007-02-14

    This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...

  13. 33 CFR 385.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE... Restoration Plan (CERP) means the plan contained in the “Final Integrated Feasibility Report and Programmatic... subsequent modification authorized in law. Comprehensive Plan Modification Report means the report prepared...

  14. 33 CFR 385.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE... Restoration Plan (CERP) means the plan contained in the “Final Integrated Feasibility Report and Programmatic... subsequent modification authorized in law. Comprehensive Plan Modification Report means the report prepared...

  15. 33 CFR 385.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE... Restoration Plan (CERP) means the plan contained in the “Final Integrated Feasibility Report and Programmatic... subsequent modification authorized in law. Comprehensive Plan Modification Report means the report prepared...

  16. 78 FR 65962 - Revision of the Land Management Plan for the Flathead National Forest

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... over time. Under the 2012 Planning Rule, the assessment of ecological, social, and economic trends and... environmental impact statement and revised Forest Plan for public review and comment, and the preparation of the final environmental impact statement and revised Forest Plan. The third stage of the process is...

  17. 75 FR 21341 - Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... adoption of the RMP/GP. The Final EIS/EIR outlines the formulation and evaluation of alternatives designed...

  18. 76 FR 58807 - An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ...: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information-- Release of Final... Protection Planning can Incorporate Climate Change Information, (EPA/600/R-09/142F). The document was... goal of this report is to evaluate where land protection planning can incorporate climate change...

  19. Plan for the Class of 2000. Final Report of the Program Planning Committee.

    ERIC Educational Resources Information Center

    Wake Forest Univ., Winston Salem, NC.

    This report presents the comprehensive academic plan for undergraduate students to be phased in at Wake Forest University (North Carolina) beginning with the class entering in 1996. Four concepts are emphasized in the plan: (1) continued personalization and individualization of the professor-student relationship; (2) establishment of a first-year…

  20. 77 FR 1873 - Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ...] Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...

  1. 77 FR 12487 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Fine Particulate Matter 2002...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ...] Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...

  2. 77 FR 12724 - Approval and Promulgation of Implementation Plans; Georgia; Macon; Fine Particulate Matter 2002...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ...] Approval and Promulgation of Implementation Plans; Georgia; Macon; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...

  3. Ten-year urban forestry action plan

    Treesearch

    J.W." Jerry" Van Sambeek

    2017-01-01

    The Ten-year Urban Forestry Action Plan: 2016-2026 was published in September, 2015 (see http://www.urbanforestry.subr.edu/FinalActionPlan_Complete_11_17_15.pdf). This 260 page heavily illustrated document was prepared by the National Urban and Community Forestry Advisory Council (NUCFAC) under leadership and funding from the USDA Forest Service. The Plan's...

  4. The Elimination of Transfer Distances Is an Important Part of Hospital Design.

    PubMed

    Karvonen, Sauli; Nordback, Isto; Elo, Jussi; Havulinna, Jouni; Laine, Heikki-Jussi

    2017-04-01

    The objective of the present study was to describe how a specific patient flow analysis with from-to charts can be used in hospital design and layout planning. As part of a large renewal project at a university hospital, a detailed patient flow analysis was applied to planning the musculoskeletal surgery unit (orthopedics and traumatology, hand surgery, and plastic surgery). First, the main activities of the unit were determined. Next, the routes of all patients treated over the course of 1 year were studied, and their physical movements in the current hospital were calculated. An ideal layout of the new hospital was then generated to minimize transfer distances by placing the main activities with close to each other, according to the patient flow analysis. The actual architectural design was based on the ideal layout plan. Finally, we compared the current transfer distances to the distances patients will move in the new hospital. The methods enabled us to estimate an approximate 50% reduction in transfer distances for inpatients (from 3,100 km/year to 1,600 km/year) and 30% reduction for outpatients (from 2,100 km/year to 1,400 km/year). Patient transfers are nonvalue-added activities. This study demonstrates that a detailed patient flow analysis with from-to charts can substantially shorten transfer distances, thereby minimizing extraneous patient and personnel movements. This reduction supports productivity improvement, cross-professional teamwork, and patient safety by placing all patient flow activities close to each other. Thus, this method is a valuable additional tool in hospital design.

  5. Making a successful transition to cash balance. Using employee choice and financial education.

    PubMed

    Scahill, P; Wiley, P

    2000-01-01

    As employee work patterns change, the need for flexible plan design has increased. Hybrid plans such as cash balance plans offer a plan design variation that incorporates elements of the traditional defined benefit plan as well as those of defined contribution plans. This article examines plan design trends and discusses both negative and positive reactions to those trends. Finally, the solution of offering choice to plan participants is suggested, and the issues that must be considered are discussed.

  6. Computer Aided Process Planning (CAPP): The User Interface for the Fabrication Module of the Rapid Design System

    DTIC Science & Technology

    1991-01-01

    plan. The Fabrication Planning Module automatically creates a plan using information from the Feature Based Design Environment (FBDE) of the RDS. It...llll By using the user Interface, the final process plan can be modified in many different ways. The translation of a design feature to a more...for the review and modification of a process plan. The Fabrication Planning Module automatically creates a plan using information from the Feature Based

  7. Planning Ahead: Object-Directed Sequential Actions Decoded from Human Frontoparietal and Occipitotemporal Networks

    PubMed Central

    Gallivan, Jason P.; Johnsrude, Ingrid S.; Randall Flanagan, J.

    2016-01-01

    Object-manipulation tasks (e.g., drinking from a cup) typically involve sequencing together a series of distinct motor acts (e.g., reaching toward, grasping, lifting, and transporting the cup) in order to accomplish some overarching goal (e.g., quenching thirst). Although several studies in humans have investigated the neural mechanisms supporting the planning of visually guided movements directed toward objects (such as reaching or pointing), only a handful have examined how manipulatory sequences of actions—those that occur after an object has been grasped—are planned and represented in the brain. Here, using event-related functional MRI and pattern decoding methods, we investigated the neural basis of real-object manipulation using a delayed-movement task in which participants first prepared and then executed different object-directed action sequences that varied either in their complexity or final spatial goals. Consistent with previous reports of preparatory brain activity in non-human primates, we found that activity patterns in several frontoparietal areas reliably predicted entire action sequences in advance of movement. Notably, we found that similar sequence-related information could also be decoded from pre-movement signals in object- and body-selective occipitotemporal cortex (OTC). These findings suggest that both frontoparietal and occipitotemporal circuits are engaged in transforming object-related information into complex, goal-directed movements. PMID:25576538

  8. 76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... power allocation. SUMMARY: The Western Area Power Administration (Western), a Federal power marketing..., Final Power Allocation developed under the requirements of subpart C-Power Marketing Initiative of the Energy Planning and Management Program (Program) Final Rule, 10 CFR part 905. These final power...

  9. National Wind Tunnel Complex (NWTC)

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The National Wind Tunnel Complex (NWTC) Final Report summarizes the work carried out by a unique Government/Industry partnership during the period of June 1994 through May 1996. The objective of this partnership was to plan, design, build and activate 'world class' wind tunnel facilities for the development of future-generation commercial and military aircraft. The basis of this effort was a set of performance goals defined by the National Facilities Study (NFS) Task Group on Aeronautical Research and Development Facilities which established two critical measures of improved wind tunnel performance; namely, higher Reynolds number capability and greater productivity. Initial activities focused upon two high-performance tunnels (low-speed and transonic). This effort was later descoped to a single multipurpose tunnel. Beginning in June 1994, the NWTC Project Office defined specific performance requirements, planned site evaluation activities, performed a series of technical/cost trade studies, and completed preliminary engineering to support a proposed conceptual design. Due to budget uncertainties within the Federal government, the NWTC project office was directed to conduct an orderly closure following the Systems Design Review in March 1996. This report provides a top-level status of the project at that time. Additional details of all work performed have been archived and are available for future reference.

  10. Training the Next Generation: Developing Health Education Skills in Undergraduate Public Health Students at a Historically Black College and University.

    PubMed

    Mincey, Krista; Gross, Tyra

    2017-01-01

    With the looming workforce crisis, undergraduate public health students could be an important link in filling this demand. As public health continues to face challenges in the future, it is important that the future workforce is not only diverse but also trained in a manner that exposes them to real-world experiences that give them an opportunity to apply coursework to solve problems. This article outlines how a health program planning course was taught at a Historically Black College and University using assignments that promote active learning. Students were assessed on their ability to plan and implement a health activity based on a developed metric. Student and instructor reflections were collected from final assessments of the health programs by both groups. All elements of the course are discussed from course design, structure, assignments, and outcomes along with student and instructor reflections and lessons learned. Results suggest that including assignments focused on active learning are beneficial to helping students learn course material. As public health continues to change, more work needs to focus on teaching pedagogies that better prepare students to address future public health issues.

  11. Calibration approach and plan for the sea and land surface temperature radiometer

    NASA Astrophysics Data System (ADS)

    Smith, David L.; Nightingale, Tim J.; Mortimer, Hugh; Middleton, Kevin; Edeson, Ruben; Cox, Caroline V.; Mutlow, Chris T.; Maddison, Brian J.; Coppo, Peter

    2014-01-01

    The sea and land surface temperature radiometer (SLSTR) to be flown on the European Space Agency's (ESA) Sentinel-3 mission is a multichannel scanning radiometer that will continue the 21 year dataset of the along-track scanning radiometer (ATSR) series. As its name implies, measurements from SLSTR will be used to retrieve global sea surface temperatures to an uncertainty of <0.3 K traced to international standards. To achieve, these low uncertainties require an end-to-end instrument calibration strategy that includes prelaunch calibration at subsystem and instrument level, on-board calibration systems, and sustained postlaunch activities. The authors describe the preparations for the prelaunch calibration activities, including the spectral response, the instrument level alignment tests, and the solar and infrared radiometric calibrations. A purpose built calibration rig has been designed and built at the Rutherford Appleton Laboratory space department (RAL Space) that will accommodate the SLSTR instrument, the infrared calibration sources, and the alignment equipment. The calibration rig has been commissioned and results of these tests will be presented. Finally, the authors will present the planning for the on-orbit monitoring and calibration activities to ensure that the calibration is maintained. These activities include vicarious calibration techniques that have been developed through previous missions and the deployment of ship-borne radiometers.

  12. Modeling the Value of Strategic Actions in the Superior Colliculus

    PubMed Central

    Thevarajah, Dhushan; Webb, Ryan; Ferrall, Christopher; Dorris, Michael C.

    2009-01-01

    In learning models of strategic game play, an agent constructs a valuation (action value) over possible future choices as a function of past actions and rewards. Choices are then stochastic functions of these action values. Our goal is to uncover a neural signal that correlates with the action value posited by behavioral learning models. We measured activity from neurons in the superior colliculus (SC), a midbrain region involved in planning saccadic eye movements, while monkeys performed two saccade tasks. In the strategic task, monkeys competed against a computer in a saccade version of the mixed-strategy game ”matching-pennies”. In the instructed task, saccades were elicited through explicit instruction rather than free choices. In both tasks neuronal activity and behavior were shaped by past actions and rewards with more recent events exerting a larger influence. Further, SC activity predicted upcoming choices during the strategic task and upcoming reaction times during the instructed task. Finally, we found that neuronal activity in both tasks correlated with an established learning model, the Experience Weighted Attraction model of action valuation (Camerer and Ho, 1999). Collectively, our results provide evidence that action values hypothesized by learning models are represented in the motor planning regions of the brain in a manner that could be used to select strategic actions. PMID:20161807

  13. 78 FR 13405 - Patient Protection and Affordable Care Act; Health Insurance Market Rules; Rate Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ...This final rule implements provisions related to fair health insurance premiums, guaranteed availability, guaranteed renewability, single risk pools, and catastrophic plans, consistent with title I of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. The final rule clarifies the approach used to enforce the applicable requirements of the Affordable Care Act with respect to health insurance issuers and group health plans that are non-federal governmental plans. This final rule also amends the standards for health insurance issuers and states regarding reporting, utilization, and collection of data under the federal rate review program, and revises the timeline for states to propose state- specific thresholds for review and approval by the Centers for Medicare & Medicaid Services (CMS).

  14. Towards the Implementation of the GEOSS Water Strategy

    NASA Astrophysics Data System (ADS)

    Lawford, R. G.; Cripe, D.

    2014-12-01

    Early in 2014, the Group on Earth Observations (GEO) adopted the GEOSS (Global Earth Observation System of Systems) Water Strategy as a potential guide for GEO-related water activities over the next decade. The Water Strategy outlines water-related issues and opportunities that fit within the general GEOSS framework that will be developed over the next decade (2016-2025). Implementation of a water strategy within the GEOSS framework can be complex because GEO Members and Participating Organizations contribute to GEO on a voluntary basis. In spite of these limitations efforts to consolidate an implementation plan have made significant advances during the past nine months. Progress towards the final GEOSS Water Strategy Implementation Plan will be reported and gaps in the plan will be identified. Specific responses to the strategy will address the need for user engagement, the development of integrated of data products, model hierarchies and user support systems, and the research that will be needed to expand the capabilities of GEOSS and its water services. One challenge for the implementation plan involves building a framework from the diverse and wide range of activities and opportunities presented by GEO Members and Participating Organizations. The priority themes within the GEO Water Strategy are being used to provide more focus for new initiatives. New activities related to these priority areas involving projects that link water and other GEO Societal Benefit Areas, as well as initiatives related to the Water-Energy-Food nexus and the Sustainable Development Goals will be described. The presentation will also explore the needs and opportunities for new satellites and other observational and information technologies to advance the implementation of the GEOSS water strategy objectives.

  15. Integrated risk and recovery monitoring of ecosystem restorations on contaminated sites

    USGS Publications Warehouse

    Hooper, Michael J.; Glomb, Stephen J.; Harper, David; Hoelzle, Timothy B.; McIntosh, Lisa M.; Mulligan, David R.

    2016-01-01

    Ecological restorations of contaminated sites balance the human and ecological risks of residual contamination with the benefits of ecological recovery and the return of lost ecological function and ecosystem services. Risk and recovery are interrelated dynamic conditions, changing as remediation and restoration activities progress through implementation into long-term management and ecosystem maturation. Monitoring restoration progress provides data critical to minimizing residual contaminant risk and uncertainty, while measuring ecological advancement toward recovery goals. Effective monitoring plans are designed concurrently with restoration plan development and implementation and are focused on assessing the effectiveness of activities performed in support of restoration goals for the site. Physical, chemical, and biotic measures characterize progress toward desired structural and functional ecosystem components of the goals. Structural metrics, linked to ecosystem functions and services, inform restoration practitioners of work plan modifications or more substantial adaptive management actions necessary to maintain desired recovery. Monitoring frequency, duration, and scale depend on specific attributes and goals of the restoration project. Often tied to restoration milestones, critical assessment of monitoring metrics ensures attainment of risk minimization and ecosystem recovery. Finally, interpretation and communication of monitoring findings inform and engage regulators, other stakeholders, the scientific community, and the public. Because restoration activities will likely cease before full ecosystem recovery, monitoring endpoints should demonstrate risk reduction and a successional trajectory toward the condition established in the restoration goals. A detailed assessment of the completed project's achievements, as well as unrealized objectives, attained through project monitoring, will determine if contaminant risk has been minimized, if injured resources have recovered, and if ecosystem services have been returned. Such retrospective analysis will allow better planning for future restoration goals and strengthen the evidence base for quantifying injuries and damages at other sites in the future.

  16. 78 FR 15011 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ..., Final EIS, DOE, TX, W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project, Review Period.... 20130055, Final EIS, NPS, IA, Effigy Mounds National Monument Final General Management Plan, Review Period...] BILLING CODE 6560-50-P ...

  17. The traverse planning process for D-RATS 2010

    NASA Astrophysics Data System (ADS)

    Hörz, Friedrich; Lofgren, Gary E.; Gruener, John E.; Eppler, Dean B.; Skinner, James A.; Fortezzo, Corey M.; Graf, Jodi S.; Bluethmann, William J.; Seibert, Marc A.; Bell, Ernest R.

    2013-10-01

    This report describes the traverse planning process for the Desert Research and Technology Studies (D-RATS) 2010 field simulation of a conceptual 14-day planetary mission. This activity took place between August 23 and September 17, 2010 in the San Francisco Volcanic Field, Arizona. It focused on the utilization of two pressurized rovers and a ground-based communication system, as well as on the development of mission operation concepts for long duration, dual-rover missions. The early planning process began some 12 months prior to the actual field tests and defined the first order engineering-, flight operations, and science objectives. The detailed implementation and refinement of these objectives took place over the ensuing 10 months, resulting in a large number of technical and operational constraints that affected the actual traverse route or the cumulative Extravehicular Activity (EVA) time available for detailed field observations. The science planning proceeded from the generation of photogeologic maps of the test area, to the establishment of prioritized science objectives and associated candidate sites for detailed field exploration. The combination of operational constraints and science objectives resulted in the final design of traverse routes and time lines for each of the 24 traverses needed to support 12 field days by two rovers. Examples of daily traverses will be given that will hopefully illustrate that the design of long duration, long distance planetary traverses is a highly interdisciplinary and time-consuming collaboration between diverse engineers, flight operations personnel, human factors interests, and planetary scientists.

  18. Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-09-22

    This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...

  19. NOAA Gulf Spill Restoration |

    Science.gov Websites

    Plan, Focusing on Recreational Use and Nutrient Reduction Louisiana Trustees Release Fourth Draft Restoration Plan, Focusing on Recreational Use and Nutrient Reduction Read More... Florida Trustee Implementation Group Releases Phase V.2 Final Restoration Plan Florida Trustee Implementation Group Releases

  20. From Welfare to Work: Dynamic Lesson Plans for ESL Learners. Final Report. Fiscal Year 1998-99 [and] From Welfare to Work: Lessons for ESL Learners.

    ERIC Educational Resources Information Center

    Center for Literacy, Inc., Philadelphia, PA.

    This document combines a final project report and the resulting guidebook of 20 lesson plans for English as a second language (ESL) instructors to help learners work within the Temporary Assistance to Needy Families (TANF) system and acquire effective job readiness strategies, choose a career path, and pursue employment. The report describes the…

Top