Science.gov

Sample records for planning approach final

  1. Final Environmental Planning Technical Report

    DTIC Science & Technology

    1984-01-01

    AD-A267 225e i Department of the Air Force FINAL ENVIRONMENTAL JUL 1993 PLANNINGU• TECHNICAL REPORT _____________-_--_ AIR QUALITY P+prpoT d kr ptu...2922 JUL 16 󈨡 9:31 703 614 -1572 PAGE. 002’ FINAL ENVIRONMENTAL PLANNING TECHNICAL REPORT AIR QUALITY January 1984 PREFACE The President has directed...Matrix 3-33 vi 1.0 INTRODUCTION 1.0 INTRODUCTION This final environmental planning technical report (EPTR) is a companion document to the air quality

  2. Voyager Approaches Final Frontier

    NASA Technical Reports Server (NTRS)

    2003-01-01

    An artist's concept illustrates the positions of the Voyager spacecraft in relation to structures formed around our Sun by the solar wind. Also illustrated is the termination shock, a violent region the spacecraft must pass through before reaching the outer limits of the solar system. At the termination shock, the supersonic solar wind abruptly slows from an average speed of 400 kilometers per second to less than 100 kilometer per second (900,000 to less than 225,000 miles per hour). Beyond the termination shock is the solar system's final frontier, the heliosheath, a vast region where the turbulent and hot solar wind is compressed as it presses outward against the interstellar wind that is beyond the heliopause. A bow shock likely forms as the interstellar wind approaches and is deflected around the heliosphere, forcing it into a teardrop-shaped structure with a long, comet-like tail.

    The exact location of the termination shock is unknown, and it originally was thought to be closer to the Sun than Voyager 1 currently is. As Voyager 1 cruised ever farther from the Sun, it confirmed that all the planets are inside an immense bubble blown by the solar wind and the termination shock was much more distant.

  3. The Final Approach Spacing Tool

    NASA Technical Reports Server (NTRS)

    Davis, Thomas J.; Bergh, Christopher; Krzeczowski, Ken J.; Schlickenmaier, H. W. (Technical Monitor)

    1994-01-01

    A system for assisting terminal area air traffic controllers in the management and control of arrival traffic, referred to as the Final Approach Spacing Tool (FAST), is being developed at NASA Ames Research Center. In a cooperative program, NASA and FAA have efforts underway to install and evaluate the system at the Dallas/Fort Worth Terminal Radar Approach Control facility. This paper will review the software architecture, the algorithms components, and the human-machine interface. The system is based on continuous updates of a detailed trajectory analyses of all arrival aircraft. FAST interprets the results of these trajectory analyses to build an efficient and procedurally acceptable plan for the arrival traffic that consists of a sequence, schedule, and runway assignment. The system utilizes a heuristically-based conflict resolution algorithm to build a solution trajectory that satisfies the plan, It extracts a series of speed and heading advisories from the solution trajectory to assist the controller in efficiently managing and controlling the arrival traffic down to the runway. The advisories are displayed in a graphical format to the controller. In addition to the radar tracking data, the system also relies on a series of data bases. These data bases contain aircraft performance models, airline preferred operational procedures, airspace structure, air traffic procedural models, and a three dimensional wind model. Field evaluation of FAST is expected to begin in 1994.

  4. Improving Vocational Education Planning: More Myth Than Reality? Final Report.

    ERIC Educational Resources Information Center

    Atteberry, Jim W.; And Others

    This final report of a project conducted to design, develop, and test a comprehensive management plan for vocational education in Missouri is divided into three sections. Section I describes the rationale and components of a model based on the general systems approach to planning. An analysis of the planning process introduces several planning…

  5. Final Draft Strategic Marketing Plan.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-02-01

    The Bonneville Power Administration (BPA) has developed a marketing plan to define how BPA can be viable and competitive in the future, a result important to BPA`s customers and constituents. The Marketing Plan represents the preferred customer outcomes, marketplace achievements, and competitive advantage required to accomplish the Vision and the Strategic Business Objectives of the agency. The Marketing Plan contributes to successful implementation of BPA`s Strategic Business Objectives (SBOs) by providing common guidance to organizations and activities throughout the agency responsible for (1) planning, constructing, operating, and maintaining the Federal Columbia River Power System; (2) conducting business with BPA`s customers; and (3) providing required internal support services.

  6. Technical planning activity: Final report

    SciTech Connect

    Not Available

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  7. Wisconsin Dissemination Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Harmatuck, Loretta

    Activities of the final year are reported as they relate to the objectives of the Wisconsin Dissemination Planning (WDP) Project: (1) to develop a plan for coordination among the dissemination functions in the Department of Public Instruction (DPI) through a state-wide steering committee; (2) to complete a needs assessment for dissemination…

  8. New Approaches to Final Cooling

    SciTech Connect

    Neuffer, David

    2014-11-10

    A high-energy muon collider scenario require a “final cooling” system that reduces transverse emittances by a factor of ~10 while allowing longitudinal emittance increase. The baseline approach has low-energy transverse cooling within high-field solenoids, with strong longitudinal heating. This approach and its recent simulation are discussed. Alternative approaches which more explicitly include emittance exchange are also presented. Round-to-flat beam transform, transverse slicing, and longitudinal bunch coalescence are possible components of the alternative approach. A more explicit understanding of solenoidal cooling beam dynamics is introduced.

  9. Personal Approaches to Career Planning.

    ERIC Educational Resources Information Center

    DeMont, Billie; DeMont, Roger

    1983-01-01

    Identifies four approaches to career planning based on situational leadership theory: the network approach, self-help approach, engineering approach, and mentor approach. Guidelines for the selection of a planning method based on the nature of the work environment and personal preference are discussed. (JAC)

  10. A unified motion planning approach for redundant and non-redundant manipulators with actuator constraints. Ph.D. Thesis Final Report

    NASA Technical Reports Server (NTRS)

    Chung, Ching-Luan

    1990-01-01

    The term trajectory planning has been used to refer to the process of determining the time history of joint trajectory of each joint variable corresponding to a specified trajectory of the end effector. The trajectory planning problem was solved as a purely kinematic problem. The drawback is that there is no guarantee that the actuators can deliver the effort necessary to track the planned trajectory. To overcome this limitation, a motion planning approach which addresses the kinematics, dynamics, and feedback control of a manipulator in a unified framework was developed. Actuator constraints are taken into account explicitly and a priori in the synthesis of the feedback control law. Therefore the result of applying the motion planning approach described is not only the determination of the entire set of joint trajectories but also a complete specification of the feedback control strategy which would yield these joint trajectories without violating actuator constraints. The effectiveness of the unified motion planning approach is demonstrated on two problems which are of practical interest in manipulator robotics.

  11. 76 FR 27086 - Final General Management Plan, Wilderness Management Plan, and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... National Park Service Final General Management Plan, Wilderness Management Plan, and Final Environmental Impact Statement; Apostle Islands National Lakeshore AGENCY: National Park Service, Department of the... 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)), the National Park...

  12. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  13. Final Action Plan to Tiger Team

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  14. 78 FR 44592 - Final General Management Plan, Final Wilderness Study, and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... National Park Service Final General Management Plan, Final Wilderness Study, and Final Environmental Impact Statement, Fort Pulaski National Monument, Georgia AGENCY: National Park Service, Interior. ACTION: Notice... 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces the availability of a...

  15. Cooperative Education Planning Study: Final Report.

    ERIC Educational Resources Information Center

    CONSAD Research Corp., Pittsburgh, PA.

    The cooperative education planning study provides an overview and initial analysis of the varied postsecondary cooperative education goals and realities and identifies key issues and indicators of program success to be considered in evaluation cooperative education programs. The study involved several data sources and approaches, including: (1) a…

  16. Institutional Planning: A Systems Approach.

    ERIC Educational Resources Information Center

    Adamson, Willie D.

    This four-chapter report explores the possible contributions of a systems approach to institutional planning. After introductory comments, Chapter I reviews the management theory of Henry Fayol, which emphasizes management tasks, such as planning, organizing, commanding, coordinating, and controlling, which are "universal" regardless of the level…

  17. WRAP program evaluation. Task 10, Evaluation of the low-income screening methodology; Task 11, Evaluation of the low-income program collaborative planning approach: [Final report

    SciTech Connect

    Ferrey, S.

    1990-12-31

    The ``Weatherization Residential Assistance Partnership,`` or WRAP program, is a fuel-blind conservation program designed to assist Northeast Utilities` low-income customers to use energy safely and efficiently. Innovative with respect to its collaborative approach and its focus on utilizing and strengthening the existing low-income weatherization service delivery network, the WRAP program offers an interesting model to other utilities which traditionally have relied on for-profit energy service contractors and highly centralized program implementation structures. This evaluation of the WRAP program is designed to: (1) Review the continuing relevance of the demand-side management option screening methodology for determining program configuration for services delivery, including rural populations; (2) locate and analyze recent additions to the energy conservation literature, data and information that bear on design of the WRAP program; and (3) through interviews assess participant impressions of the collaborative process used to plan, develop and implement the WRAP process.

  18. Groundwater monitoring well assessment final work plan

    SciTech Connect

    Not Available

    1993-10-01

    Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EA has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.

  19. 77 FR 15121 - Final Land Protection Plan and Final Environmental Assessment for Everglades Headwaters National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... Fish and Wildlife Service Final Land Protection Plan and Final Environmental Assessment for Everglades... of our Final Land Protection Plan (LPP) and Final Environmental Assessment (EA) for the recently... conservation landscape; to provide quality habitats for native wildlife diversity and at-risk species; to...

  20. Final Federal Radon Action Plan Scorecard

    EPA Pesticide Factsheets

    This page provides information and a link to the draft Federal Radon Action Plan. It also contains a Federal Radon Action Plan Scorecard, a tool designed to display the current status of each federal agency commitments and outcomes to date.

  1. Continuation of Assessment and Planning. Final Report.

    ERIC Educational Resources Information Center

    Jessup, Roger

    A project was conducted to develop a technical assistance package to assist state and local policy agencies and schools in needs assessment and planning projects as outlined in the Indiana State Plan for vocational education. Of top priority is the development of instrumentation and a system indicating in measurable terms the job requirements…

  2. Feasibility Study, Regional Planning, and Initiation of a Regional Approach to Offering Vocational Technical Education in Douglas County. Joint and Cooperative Vocational Education Program. Final Report.

    ERIC Educational Resources Information Center

    Martin, Les; Wells, Sherril

    A regional approach to offering vocational education in Douglas County, Oregon, had been discussed for many years. In 1984, a feasibility study was conducted to determine whether such a regional approach would be possible in the county and to establish vocational programs determined as high priority in the feasibility study. Through discussions…

  3. Northeast Regional Education Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Northeast Regional Exchange Steering Committee, Boston, MA.

    Created to facilitate the dissemination of information between researchers and the educational community, the Northeast Regional Exchange steering committee has defined needs, determined agency qualifications, identified priorities, undertaken a series of minigrant projects, and developed plans for the extension of these projects and a study of…

  4. Final Public Involvement & Response Plan (PIRP)

    DTIC Science & Technology

    1994-07-01

    COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT ( CERCLA ) OF 1980, OTHERWISE KNOWN AS SUPERFUND . An Act to provide for liability... CERCLA ), the Superfund Amendments and Reauthorization Act (SARA) of 1986, the Defense Authorization Amendments and Base Closure and Realignment Act...the CERCLA , commonly known as Superfund , as amended by the SARA, and applicable Commonwealth of Virginia laws and regulations. This plan follows

  5. Northeast Regional Education Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Northeast Regional Exchange Steering Committee, Boston, MA.

    Created to facilitate the dissemination of information between researchers and the educational community, the Northeast Regional Exchange steering committee has defined needs, determined agency qualifications, identified priorities, undertaken a series of minigrant projects, and developed plans for the extension of these projects and a study of…

  6. Training for Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Paddock, Susan C.

    Concerned with training local educational agencies in planning and administering community education programs, this report summarizes a year-long project in Arizona, New Mexico, and Colorado. Included are a narrative description of the project and its activities, a list of objectives and agenda subects, assessment, a summary evaluation, and…

  7. 45 CFR 1386.36 - Final disapproval of the State plan or plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Final disapproval of the State plan or plan amendments. 1386.36 Section 1386.36 Public Welfare Regulations Relating to Public Welfare (Continued) OFFICE... State Developmental Disabilities Councils § 1386.36 Final disapproval of the State plan or...

  8. Final Environmental Planning Technical Report. Transportation

    DTIC Science & Technology

    1984-01-01

    range plans call for the construction of a perma- nent facility. 3-89 o Frontier Services, a related corporate entity of Frontier Airlines, operates an...discontinuation of jet service by Frontier Airlines. A 1-percent growth in jet traffic is assumed thereafter based on corporate and charter operations...Proposed Action 3.5.3.2.1 Cheyenne Airport There are two factors that could result in impacts on the Cheyenne Airport. One is the increased corporate and

  9. Groundwater Monitoring Plan. Volume 2. Final Quality Assurance Project Plan

    DTIC Science & Technology

    1993-10-01

    Samples Added weekly blank for organic-free deionized water and Collected in the Field. filter blank. Specific to Project. 5-9 5.5 Sample Custody Greater...Gmoundwater Monitoing Plan, VOLUME/i Filter blanks will be collected at a frequency of 1 per lot. Organic-free, deionized water will be run through the filter ...using the filtering apparatus used to filter groundwater samples. The water will be collected in the appropriate sample bottles following filtering

  10. Claims Procedure for Plans Providing Disability Benefits. Final rule.

    PubMed

    2016-12-19

    This document contains a final regulation revising the claims procedure regulations under the Employee Retirement Income Security Act of 1974 (ERISA) for employee benefit plans providing disability benefits. The final rule revises and strengthens the current rules primarily by adopting certain procedural protections and safeguards for disability benefit claims that are currently applicable to claims for group health benefits pursuant to the Affordable Care Act. This rule affects plan administrators and participants and beneficiaries of plans providing disability benefits, and others who assist in the provision of these benefits, such as third-party benefits administrators and other service providers.

  11. Technical assistance contractor Management Plan. Final [report

    SciTech Connect

    Not Available

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  12. Hawaii State Plan for Occupational Safety and Health. Final rule.

    PubMed

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  13. Systematic Approach for Decommissioning Planning and Estimating

    SciTech Connect

    Dam, A. S.

    2002-02-26

    Nuclear facility decommissioning, satisfactorily completed at the lowest cost, relies on a systematic approach to the planning, estimating, and documenting the work. High quality information is needed to properly perform the planning and estimating. A systematic approach to collecting and maintaining the needed information is recommended using a knowledgebase system for information management. A systematic approach is also recommended to develop the decommissioning plan, cost estimate and schedule. A probabilistic project cost and schedule risk analysis is included as part of the planning process. The entire effort is performed by a experienced team of decommissioning planners, cost estimators, schedulers, and facility knowledgeable owner representatives. The plant data, work plans, cost and schedule are entered into a knowledgebase. This systematic approach has been used successfully for decommissioning planning and cost estimating for a commercial nuclear power plant. Elements of this approach have been used for numerous cost estimates and estimate reviews. The plan and estimate in the knowledgebase should be a living document, updated periodically, to support decommissioning fund provisioning, with the plan ready for use when the need arises.

  14. 75 FR 28287 - Final Plan for Fiscal Year 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-20

    ... violence, crime, and abuse experiences. Community-Based Violence Prevention Demonstration Program Under... Office of Juvenile Justice and Delinquency Prevention Final Plan for Fiscal Year 2010 AGENCY: Office of Juvenile Justice and Delinquency Prevention, Office of Justice Programs, Department of Justice. ACTION...

  15. FOCUS: a fire management planning system -- final report

    Treesearch

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  16. 75 FR 15457 - Notice of Availability of Final Elk Management Plan and Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... National Park Service Notice of Availability of Final Elk Management Plan and Environmental Impact... the availability of a Final Elk Management Plan and Environmental Impact Statement (Plan/EIS) for... ); click on the link to Elk Management Plan/ EIS. You may also obtain a copy of the final Plan/EIS...

  17. Test Planning Approach and Lessons

    NASA Technical Reports Server (NTRS)

    Parkinson, Douglas A.; Brown, Kendall K.

    2004-01-01

    As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

  18. Final Report - Development of a Strategic Energy Plan

    SciTech Connect

    Maracas, Kate; Hooks, Todd

    2006-11-30

    The Agua Caliente Band of Cahuilla Indians was awarded a grant under the U.S. Department of Energy’s (“DOE”) Tribal Energy Program to develop a comprehensive Tribal energy plan. The grant, awarded under DOE’s First Steps program, supported the development of a strategic energy plan that integrates with the Tribe’s overall planning and economic development goals, and aligns with Tribal cultural, social, political, and spiritual values. The Tribe set out to incorporate its energy plan into (i) a broader economic development strategy developed by investigators at the University of California at Riverside, and (ii) the overarching goals for job-creation and wealth-creation that are held by both the Tribe and the surrounding Coachella Valley. With these wide-ranging objectives in mind, the Tribe and its consultant, Red Mountain Energy Partners, engaged in a phased approach to creating the strategic energy plan. As illustrated in Figure 1 below, the proposed approach involved both “serial” and “parallel” activities. The capacity-building component of this approach occurred throughout the duration of the project period.

  19. SPATIAL APPROACH TO PLANNING THE PHYSICAL ENVIRONMENT.

    ERIC Educational Resources Information Center

    BELLOMY, CLEON C.; CAUDILL, WILLIAM W.

    THE PURPOSE OF THIS REPORT DEFINES THE SPATIAL APPROACH TO PLANNING THE PHYSICAL ENVIRONMENT AND SUGGESTS A MORE NATURAL APPROACH TO A LESS RESTRICTED ARCHITECTURE. ONE OF THE TWO BASIC ARCHITECTURAL ELEMENTS IN THE SPATIAL CONCEPT IS THE HORIZONTAL SCREEN WHICH KEEPS THE SUN AND RAIN OFF, LETS IN LIGHT, KEEPS OUT SUN HEAT, RETAINS ROOM HEAT, AND…

  20. Voyager Approaches Final Frontier Artist Concept

    NASA Image and Video Library

    2003-12-12

    An artist's concept illustrates the positions of the Voyager spacecraft in relation to structures formed around our Sun by the solar wind. Also illustrated is the termination shock, a violent region the spacecraft must pass through before reaching the outer limits of the solar system. At the termination shock, the supersonic solar wind abruptly slows from an average speed of 400 kilometers per second to less than 100 kilometer per second (900,000 to less than 225,000 miles per hour). Beyond the termination shock is the solar system's final frontier, the heliosheath, a vast region where the turbulent and hot solar wind is compressed as it presses outward against the interstellar wind that is beyond the heliopause. A bow shock likely forms as the interstellar wind approaches and is deflected around the heliosphere, forcing it into a teardrop-shaped structure with a long, comet-like tail. The exact location of the termination shock is unknown, and it originally was thought to be closer to the Sun than Voyager 1 currently is. As Voyager 1 cruised ever farther from the Sun, it confirmed that all the planets are inside an immense bubble blown by the solar wind and the termination shock was much more distant. http://photojournal.jpl.nasa.gov/catalog/PIA04927

  1. Unified Process Planning, the Allison approach

    NASA Astrophysics Data System (ADS)

    Simmons, Clair

    Process Planning, the organization of product/process information for the manufacturing enterprise, represents the lead activity within the manufacturing portion of a business. Process planning encompasses all aspects that contribute to the successful manufacture of a quality product. This paper explains the role of process planning and how a 'Unified Process Plan' (UPP) provides Allison with a more effective and organized method of manufacturing information management. This approach allows for a more effective use of the manufacturing engineering staff. Allison is transitioning to a knowledge base of process information that will be continually improved and accessible to every engineer and operator. Unified Process Planning focuses key pieces of information into one manageable and controlled environment.

  2. FINAL CLOSURE PLAN SURFACE IMPOUNDMENTS CLOSURE, SITE 300

    SciTech Connect

    Lane, J E; Scott, J E; Mathews, S E

    2004-09-29

    Lawrence Livermore National Laboratory of the University of California (LLNL) operates two Class II surface impoundments that store wastewater that is discharged from a number of buildings located on the Site 300 Facility (Site 300). The wastewater is the by-product of explosives processing. Reduction in the volume of water discharged from these buildings over the past several years has significantly reduced the wastewater storage needs. In addition, the impoundments were constructed in 1984, and the high-density polyethylene (HDPE) geomembrane liners are nearing the end of their service life. The purpose of this project is to clean close the surface impoundments and provide new wastewater storage using portable, above ground storage tanks at six locations. The tanks will be installed prior to closure of the impoundments and will include heaters for allowing evaporation during relatively cool weather. Golder Associates (Golder) has prepared this Final Closure Plan (Closure Plan) on behalf of LLNL to address construction associated with the clean closure of the impoundments. This Closure Plan complies with State Water Resources Control Board (SWRCB) Section 21400 of the California Code of Regulations Title 27 (27 CCR {section}21400). As required by these regulations and guidance, this Plan provides the following information: (1) A site characterization, including the site location, history, current operations, and geology and hydrogeology; (2) The regulatory requirements relevant to clean closure of the impoundments; (3) The closure procedures; and, (4) The procedures for validation and documentation of clean closure.

  3. A Composite Approach to Air Force Planning

    DTIC Science & Technology

    1996-01-01

    life -cycle view of costs, timing major investments to avoid budgetary shocks or temporary losses of capability, and providing reality checks on what...of strange and unpredictable forces, so he takes whatever comfort he can by challenging the fates. He shouts his plans into the storm of life . Even...armies, or provocative measures that could create enemies). Finally, there is a view—well based in most individuals’ life experiences and the

  4. A Practical Approach to Catastrophe Planning.

    ERIC Educational Resources Information Center

    Ritz, James R.

    1987-01-01

    With more and more users in colleges and universities relying on electronic information, the need for a contingency plan in the event of a disaster has become more pressing. Setting objectives, impact analysis, interim processing strategy, working with users, and a two-level approach are discussed. (MLW)

  5. Optimization approaches for planning external beam radiotherapy

    NASA Astrophysics Data System (ADS)

    Gozbasi, Halil Ozan

    Cancer begins when cells grow out of control as a result of damage to their DNA. These abnormal cells can invade healthy tissue and form tumors in various parts of the body. Chemotherapy, immunotherapy, surgery and radiotherapy are the most common treatment methods for cancer. According to American Cancer Society about half of the cancer patients receive a form of radiation therapy at some stage. External beam radiotherapy is delivered from outside the body and aimed at cancer cells to damage their DNA making them unable to divide and reproduce. The beams travel through the body and may damage nearby healthy tissue unless carefully planned. Therefore, the goal of treatment plan optimization is to find the best system parameters to deliver sufficient dose to target structures while avoiding damage to healthy tissue. This thesis investigates optimization approaches for two external beam radiation therapy techniques: Intensity-Modulated Radiation Therapy (IMRT) and Volumetric-Modulated Arc Therapy (VMAT). We develop automated treatment planning technology for IMRT that produces several high-quality treatment plans satisfying provided clinical requirements in a single invocation and without human guidance. A novel bi-criteria scoring based beam selection algorithm is part of the planning system and produces better plans compared to those produced using a well-known scoring-based algorithm. Our algorithm is very efficient and finds the beam configuration at least ten times faster than an exact integer programming approach. Solution times range from 2 minutes to 15 minutes which is clinically acceptable. With certain cancers, especially lung cancer, a patient's anatomy changes during treatment. These anatomical changes need to be considered in treatment planning. Fortunately, recent advances in imaging technology can provide multiple images of the treatment region taken at different points of the breathing cycle, and deformable image registration algorithms can

  6. Liquid effluent retention facility final-status groundwater monitoring plan

    SciTech Connect

    Sweeney, M.D.; Chou, C.J.; Bjornstad, B.N.

    1997-09-01

    The following sections describe the groundwater-monitoring program for the Liquid Effluent Retention Facility (LERF). The LERF is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The LERF is included in the {open_quotes}Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit WA890008967{close_quotes}, (referred to herein as the Permit) (Ecology 1994) and is subject to final-status requirements for groundwater monitoring (WAC 173-303-645). This document describes a RCRA/WAC groundwater detection-monitoring program for groundwater in the uppermost aquifer system at the LERF. This plan describes the LERF monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the LERF. This plan will be used to meet the groundwater monitoring requirements from the time the LERF becomes part of the Permit and through the post-closure care period, until certification of final closure.

  7. Plan for advanced microelectronics processing technology application. Final report

    SciTech Connect

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  8. Reference condition approach to restoration planning

    USGS Publications Warehouse

    Nestler, J.M.; Theiling, C.H.; Lubinski, S.J.; Smith, D.L.

    2010-01-01

    Ecosystem restoration planning requires quantitative rigor to evaluate alternatives, define end states, report progress and perform environmental benefits analysis (EBA). Unfortunately, existing planning frameworks are, at best, semi-quantitative. In this paper, we: (1) describe a quantitative restoration planning approach based on a comprehensive, but simple mathematical framework that can be used to effectively apply knowledge and evaluate alternatives, (2) use the approach to derive a simple but precisely defined lexicon based on the reference condition concept and allied terms and (3) illustrate the approach with an example from the Upper Mississippi River System (UMRS) using hydrologic indicators. The approach supports the development of a scaleable restoration strategy that, in theory, can be expanded to ecosystem characteristics such as hydraulics, geomorphology, habitat and biodiversity. We identify three reference condition types, best achievable condition (A BAC), measured magnitude (MMi which can be determined at one or many times and places) and desired future condition (ADFC) that, when used with the mathematical framework, provide a complete system of accounts useful for goal-oriented system-level management and restoration. Published in 2010 by John Wiley & Sons, Ltd.

  9. 64 FR 34266 - Notice of Availability of Proposed Owyhee Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    1999-06-25

    ... Bureau of Land Management Notice of Availability of Proposed Owyhee Resource Management Plan and Final... Resource Management Plan (RMP) and associated final Environmental Impact Statement (EIS) for the Owyhee... the Owyhee Proposed Resource Management Plan, which is Alternative E in the final EIS. The...

  10. 76 FR 68503 - Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park, Idaho, Montana...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... National Park Service Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park... the Final Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park. SUMMARY... availability of a Final Environmental Impact Statement (EIS) for a Winter Use Plan for Yellowstone...

  11. 75 FR 70670 - Final Vehicle Safety Rulemaking and Research Priority Plan 2010-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... National Highway Traffic Safety Administration 49 CFR Part 571 Final Vehicle Safety Rulemaking and Research... availability of the Final Vehicle Safety Rulemaking and Research Priority Plan 2010-2013 (Priority Plan) in Docket No. NHTSA-2009-0108. This Priority Plan is an update to the Final Vehicle Safety Rulemaking...

  12. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... National Park Service Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement... Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan, Biscayne National... Impact Statement for the Coral Reef Restoration Plan (Plan/FEIS) for Biscayne National Park, Florida....

  13. Worries and plans as individuals approach retirement.

    PubMed

    Yakoboski, Paul J

    2011-01-01

    The primary objective of an employment-based retirement plan is to provide a secure and adequate income for workers throughout retirement. In the defined contribution (DC) framework, asset accumulation is a means to the end, but not the end. Drawing retirement income from savings and paying for health care expenses in retirement are the two issues that concern individuals the most as they approach retirement. This article examines the attitudes of near-retirees regarding these risks and their plans for managing them. The author discusses how DC plan design can have a major impact on how individuals convert their retirement savings to retirement income; differences in survey responses between those who have consulted a financial advisor or other financial professional and those who have not; and the role of trust in implementing advice.

  14. Evaluation of Resource Acquisition Approaches : Final Report.

    SciTech Connect

    O`Neill, Maura L.; Mortimer, Tom; Palermini, Debbi; Nelson, Kari

    1991-09-12

    Over the last few years, Bonneville has been addressing this need and has developed numerous ways of acquiring resources. Four of these Approaches, the Competitive Acquisition, Billing Credits, and Targeted Acquisition Programs, and the Cowlitz Falls Hydroelectric Project, were the subject of this evaluation project. Each Approach is currently in different stages of a process, and Bonneville felt it was an appropriate time that an evaluation be conducted. The purpose of this evaluation is to analyze the various Approaches` processes, to learn what`s working and what`s not, and to offer recommendations as to how Bonneville might improve their resources acquisition efforts. The evaluation was conducted with no preconceived biases.

  15. 76 FR 39072 - Notice of Availability of a Final Environmental Impact Statement and Final Habitat Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... 0648-XA439 Notice of Availability of a Final Environmental Impact Statement and Final Habitat... Statement and Habitat Conservation Plan. SUMMARY: The National Marine Fisheries Service (NMFS) and the U.S... also announce the availability of Kent's Clark Springs Water Supply System Habitat Conservation Plan...

  16. Ameliorated GA approach for base station planning

    NASA Astrophysics Data System (ADS)

    Wang, Andong; Sun, Hongyue; Wu, Xiaomin

    2011-10-01

    In this paper, we aim at locating base station (BS) rationally to satisfy the most customs by using the least BSs. An ameliorated GA is proposed to search for the optimum solution. In the algorithm, we mesh the area to be planned according to least overlap length derived from coverage radius, bring into isometric grid encoding method to represent BS distribution as well as its number and develop select, crossover and mutation operators to serve our unique necessity. We also construct our comprehensive object function after synthesizing coverage ratio, overlap ratio, population and geographical conditions. Finally, after importing an electronic map of the area to be planned, a recommended strategy draft would be exported correspondingly. We eventually import HongKong, China to simulate and yield a satisfactory solution.

  17. Environmental Education - A Problem Approach. Final Report.

    ERIC Educational Resources Information Center

    Presnell, Richard W.

    The envrionmental education project, "A Problem Approach," was designed to involve University faculty and community leaders in a number of goals. They attempted to produce a series of audio-taped slide presentations designed to develop a working level of environmental literacy in the project participants and in those people who…

  18. 75 FR 57059 - Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... Fish and Wildlife Service Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and Final Environmental Impact Statement AGENCY: Fish and Wildlife Service, Interior. ACTION... received from the Montana Department of Natural Resources and Conservation (DNRC) a Final...

  19. Regional monitoring program for the Galveston Bay plan. Final report

    SciTech Connect

    Lane, W.G.

    1994-11-01

    National Estuary Program guidance requires the development of a detailed Environmental Monitoring Plan, as a separate support document to be submitted as a supplement to The Galveston Bay Plan. The two major goals for monitoring work as defined in EPA guidance are: (1) to measure the effectiveness of the management plan`s actions and objectives; and (2) to provide essential information that can be used to redirect and focus actions implemented under The Plan as they are actually carried out.

  20. RTSTEP regional transportation simulation tool for emergency planning - final report.

    SciTech Connect

    Ley, H.; Sokolov, V.; Hope, M.; Auld, J.; Zhang, K.; Park, Y.; Kang, X.

    2012-01-20

    Large-scale evacuations from major cities during no-notice events - such as chemical or radiological attacks, hazardous material spills, or earthquakes - have an obvious impact on large regions rather than on just the directly affected area. The scope of impact includes the accommodation of emergency evacuation traffic throughout a very large area; the planning of resources to respond appropriately to the needs of the affected population; the placement of medical supplies and decontamination equipment; and the assessment and determination of primary escape routes, as well as routes for incoming emergency responders. Compared to events with advance notice, such as evacuations based on hurricanes approaching an affected area, the response to no-notice events relies exclusively on pre-planning and general regional emergency preparedness. Another unique issue is the lack of a full and immediate understanding of the underlying threats to the population, making it even more essential to gain extensive knowledge of the available resources, the chain of command, and established procedures. Given the size of the area affected, an advanced understanding of the regional transportation systems is essential to help with the planning for such events. The objectives of the work described here (carried out by Argonne National Laboratory) is the development of a multi-modal regional transportation model that allows for the analysis of different evacuation scenarios and emergency response strategies to build a wealth of knowledge that can be used to develop appropriate regional emergency response plans. The focus of this work is on the effects of no-notice evacuations on the regional transportation network, as well as the response of the transportation network to the sudden and unusual demand. The effects are dynamic in nature, with scenarios changing potentially from minute to minute. The response to a radiological or chemical hazard will be based on the time-delayed dispersion of

  1. Manipulation planning for redundant robots: A practical approach

    SciTech Connect

    Ahuactzin, J.M.; Gupta, K.; Mazer, E.

    1998-07-01

    An emerging paradigm in solving the classical motion-planning problem (among static obstacles) is to capture the connectivity of the configuration space using a finite (but possibly large) set of landmarks (or nodes) in it. In this paper, the authors extend this paradigm to manipulation-planning problem, where the goal is to plan the motion of a robot so that it can move a given object from an initial configuration to a final configuration while avoiding collisions with the static obstacles and other movable objects in the environment. The specific approach adapts Adriadne`s clew algorithm, which has been shown effective for classical motion-planning problems (Mazer et al. 1994; Ahuactzin 1994). In the approach, landmarks are placed in lower dimensional submanifolds of the composite configuration space. These landmarks represent stable grasps that are reachable from the initial configuration. From each new landmark, the planner attempts to reach the goal configuration by executing a local planner, again in a lower (but different) dimensional submanifold of the composite configuration space. The approach is probabilistically resolution complete, does not assume that a closed-form inverse-kinematics solution for the manipulator is available, and is particularly suitable for redundant manipulators. The authors also demonstrate that the approach is practical for realistic problems in three-dimensional environments with manipulator arms having fairly large numbers of degrees of freedom. They have experimented with this approach for a 7-DOF manipulator in 3-D environments with one movable object, and computation times range between a few minutes and a few tens of minutes--in the experiments, between 3 min to 15 min, depending on the task difficulty.

  2. PARETO: A novel evolutionary optimization approach to multiobjective IMRT planning.

    PubMed

    Fiege, Jason; McCurdy, Boyd; Potrebko, Peter; Champion, Heather; Cull, Andrew

    2011-09-01

    of beams. This initial evaluation of the evolutionary optimization software tool pareto for IMRT treatment planning demonstrates feasibility and provides motivation for continued development. Advantages of this approach over current commercial methods for treatment planning are many, including: (1) fully automated optimization that avoids human controlled iterative optimization and potentially improves overall process efficiency, (2) formulation of the problem as a true multiobjective one, which provides an optimized set of Pareto nondominated solutions refined over hundreds of generations and compiled from thousands of parameter sets explored during the run, and (3) rapid exploration of the final nondominated set accomplished by a graphical interface used to select the best treatment option for the patient.

  3. PARETO: A novel evolutionary optimization approach to multiobjective IMRT planning

    SciTech Connect

    Fiege, Jason; McCurdy, Boyd; Potrebko, Peter; Champion, Heather; Cull, Andrew

    2011-09-15

    promise in optimizing the number of beams. Conclusions: This initial evaluation of the evolutionary optimization software tool pareto for IMRT treatment planning demonstrates feasibility and provides motivation for continued development. Advantages of this approach over current commercial methods for treatment planning are many, including: (1) fully automated optimization that avoids human controlled iterative optimization and potentially improves overall process efficiency, (2) formulation of the problem as a true multiobjective one, which provides an optimized set of Pareto nondominated solutions refined over hundreds of generations and compiled from thousands of parameter sets explored during the run, and (3) rapid exploration of the final nondominated set accomplished by a graphical interface used to select the best treatment option for the patient.

  4. EPA announces final revisions to superfund national contingency plan

    SciTech Connect

    Not Available

    1990-04-01

    EPA has announced final revisions to the National Contingency Plan (NCP), which lays the ground rules for how EPA and other federal agencies, states and private parties clean up hazardous wastes sites and discharges of oil. The new NCP serves to strengthen key areas of the Superfound implementation process as recommended in EPA Administrator William Reily's so called 90-day Management Review in June 1989. The management review emphasized technologies development, public involvement, and realistic goals, such as making sites safer and addressing worst sites first. The National Priorities List (NPL) is EPA's list of those sites posing the greatest danger or potential danger to human health and the environment. There are currently 1219 sites on the NPL. Other issues addressed in the new NCP include informing the public of the types of remedies that EPA has selected, or anticipates selecting; strengthening state involvement by authorizing states to conduct investigations, analyses and remedy selections at federal Superfund sites; and measuring success of site cleanups.

  5. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... NHTSA Vehicle Safety and Fuel Economy Rulemaking and Research Priority Plan 2011-2013 (Priority Plan) in... Final NHTSA Vehicle Safety and Fuel Economy Rulemaking and Research Priority Plan 2011-2013. This plan... economy that must meet Congressional mandates or Secretarial commitments. Since these are expected to...

  6. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    1999-09-09

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP.

  7. 76 FR 61379 - Final Recovery Plan, Bexar County Karst Invertebrates

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ..., Texas. ADDRESSES: You may download the recovery plan from the internet at http://www.fws.gov/endangered... plan would not promote the conservation of a particular species. Species' History The following nine...

  8. A Lexical Approach to the Remediation of Final Sound Omissions

    ERIC Educational Resources Information Center

    Davis, Marilyn; Ferrier, E. E.

    1973-01-01

    The hypothesis that a language training (vocabulary building) or lexical approach to the remediation of final sound omissions may be an effective method of therapy was tested with a 6-year-old trainable mentally retarded boy. (Author/GW)

  9. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    1999-12-14

    The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP).

  10. Direct Final Approval of the Lake Tahoe Nevada CO Maintenance Area's Second Maintenance Plan

    EPA Pesticide Factsheets

    December 22, 2016: In a direct final action EPA is approved the State of Nevada's request to approve the 2012 maintenance plan for Lake Tahoe Nevada carbon monoxide maintenance area as a revision to the Nevada State Implementation Plan.

  11. Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.

    PubMed

    2000-03-23

    This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage.

  12. Transportation control measure: State Implementation Plan guidance (revised final report)

    SciTech Connect

    Eisinger, D.S.; Deakin, E.A.; Mahoney, L.A.; Morris, R.E.; Ireson, R.G.

    1990-09-01

    The document has been developed for the United States Environmental Protection Agency to summarize current knowledge about transportation control measures (TCMs). The target audience includes transportation and air quality management staff at all government levels. The guidance development effort is motivated by the need to provide post-1987 guidance to attain National Ambient Air Quality Standards (NAAQS). The document provides descriptions and examples of the most frequently implemented TCMs; institutional guidance such as assessing feasibility, agency responsibilities, and funding; and techniques for monitoring and enforcing TCMs. In addition, the document describes the tools available for evaluating TCM impacts on hydrocarbons, nitrogen oxides, and carbon monoxide emissions. Appendices present approaches to estimate TCM effects on PM-10 emissions; important sources of additional information; implementation experiences in various cities; and rules of thumb to quantitatively evaluate TCM transportation system effects. The information presented demonstrates that there have been significant advances in TCM development over the past decade, and that TCMs are appropriate control options for state implementation plans.

  13. 78 FR 760 - Notice of Availability of the Final General Management Plan/Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... National Park Service Notice of Availability of the Final General Management Plan/Final Environmental Impact Statement for the Ice Age Complex at Cross Plains, WI AGENCY: National Park Service, Interior. ACTION: Notice of availability. SUMMARY: The National Park Service (NPS) announces the availability...

  14. Prioritization of tasks in the draft LWR safety technology program plan. Final report

    SciTech Connect

    Lim, E. Y.; Miller, W. J.; Parkinson, W. J.; Ritzman, R. L.; vonHerrmann, J. L.; Wood, P. J.

    1980-05-01

    The purpose of this report is to describe both the approach taken and the results produced in the SAI effort to prioritize the tasks in the Sandia draft LWR Safety Technology Program Plan. This work used the description of important safety issues developed in the Reactor Safety Study (2) to quantify the effect of safety improvements resulting from a research and development program on the risk from nuclear power plants. Costs of implementation of these safety improvements were also estimated to allow a presentation of the final results in a value (i.e., risk reduction) vs. impact (i.e., implementation costs) matrix.

  15. ENPEP: An integrated approach to energy planning

    SciTech Connect

    Hamilton, B.P.; Cirillo, R.R.; Buehring, W.A.

    1992-09-01

    Many models have been developed to analyze various aspects of the energy system. The Energy and Power Evaluation Program (ENPEP) is a set of microcomputer-based energy planning tools that are designed to provide an integrated analysis capability. ENPEP begins with a macroeconomic analysis, develops an energy demand forecast based on this analysis, carries out an integrated supply/demand analysis for the entire energy system, evaluates the electric system component of the energy system in detail, and determines the impacts of alternative configurations. This approach is an enhancement of existing techniques in that it places emphasis on looking at the electric system as an integral part of the entire energy supply system. Also, it explicitly considers the impacts the power system has on the rest of the energy system and on the economy as a whole.

  16. ENPEP: An integrated approach to energy planning

    SciTech Connect

    Hamilton, B.P.; Cirillo, R.R.; Buehring, W.A.

    1992-01-01

    Many models have been developed to analyze various aspects of the energy system. The Energy and Power Evaluation Program (ENPEP) is a set of microcomputer-based energy planning tools that are designed to provide an integrated analysis capability. ENPEP begins with a macroeconomic analysis, develops an energy demand forecast based on this analysis, carries out an integrated supply/demand analysis for the entire energy system, evaluates the electric system component of the energy system in detail, and determines the impacts of alternative configurations. This approach is an enhancement of existing techniques in that it places emphasis on looking at the electric system as an integral part of the entire energy supply system. Also, it explicitly considers the impacts the power system has on the rest of the energy system and on the economy as a whole.

  17. Financial Planning for Information Technology: Conventional Approaches Need Not Apply.

    ERIC Educational Resources Information Center

    Falduto, Ellen F.

    1999-01-01

    Rapid advances in information technology have rendered conventional approaches to planning and budgeting useless, and no single method is universally appropriate. The most successful planning efforts are consistent with the institution's overall plan, and may combine conventional, opportunistic, and entrepreneurial approaches. Chief financial…

  18. Final Report for the Soboba Strategic Tribal Energy Planning Project

    SciTech Connect

    Miller, Kim

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  19. Final consolidated action plan to Tiger Team. Volume 1

    SciTech Connect

    Not Available

    1992-10-01

    This document is a compilation of different issues identified by the Tiger Teams at the several locations of the Sandia National Laboratory. In this volume there are findings/concerns and the resultant responses and planned actions for these issues. Also included are the schedules and costs for the planned actions.

  20. Designing Training Plans for Distributive Education. Final Report.

    ERIC Educational Resources Information Center

    Syhlman, William D.

    These distributive education training and development plans for secondary-level programs provide lists of competencies a student needs to hold a job in sales and marketing occupational areas. The design of the training plans is based on a "pyramid" which incorporates the following five sections or levels of competencies (from general to…

  1. Project MAP: Model Accounting Plan for Special Education. Final Report.

    ERIC Educational Resources Information Center

    Rossi, Robert J.

    The Model Accounting Plan (MAP) is a demographic accounting system designed to meet three major goals related to improving planning, evaluation, and monitoring of special education programs. First, MAP provides local-level data for administrators and parents to monitor the progress, transition patterns, expected attainments, and associated costs…

  2. Assessment of the Career Planning Support System. Final Report.

    ERIC Educational Resources Information Center

    Pearsol, James A.; And Others

    The National Center for Research in Vocational Education conducted an assessment to report information about the impact of the Career Planning Support System (CPSS) on high school staffs' planning and career development activities for student career development. (CPSS is a package of materials designed to enable a high school staff to improve…

  3. 2006 Long Range Development Plan Final Environmental ImpactReport

    SciTech Connect

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been reduced since the Notice of Preparation for

  4. Owens Valley Serious Area Plan for the 1987 24-Hour PM10; Final Approval of California Air Plan

    EPA Pesticide Factsheets

    EPA is taking final action to approve a state implementation plan (SIP) revision submitted by the State of California to meet Clean Air Act equirements applicable to the Owens Valley PM10 nonattainment area.

  5. 77 FR 31870 - Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... Fish and Wildlife Service Final Comprehensive Conservation Plan for the Bowdoin National Wildlife..., the U.S. Fish and Wildlife Service (Service) announce that our Final Comprehensive Conservation Plan... the four-county Bowdoin Wetland Management District (district), which has nine waterfowl production...

  6. Effect of the Family and Medical Leave Act on the operation of cafeteria plans. Final regulations.

    PubMed

    2001-10-17

    This document contains final regulations relating to cafeteria plans that reflect changes made by the Family and Medical Leave Act of 1993 (Act). The final regulations provide the public with guidance needed to comply with the Act and affect employees who participate in cafeteria plans.

  7. 76 FR 77249 - Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... National Park Service Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone... availability of a Record of Decision on the Final Environmental Impact Statement for a Winter Use Plan.../2010 and 2010/2011. Up to 318 commercially guided, best-available-technology snowmobiles and...

  8. 75 FR 49514 - Notice of Availability for the Little Snake Proposed Resource Management Plan and Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... Bureau of Land Management Notice of Availability for the Little Snake Proposed Resource Management Plan... Proposed Resource Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the Little Snake... Snake Proposed RMP/Final EIS have been sent to affected Federal, State, and local government...

  9. Planning and Design: A Systems Approach.

    ERIC Educational Resources Information Center

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community…

  10. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  11. Planning and Design: A Systems Approach.

    ERIC Educational Resources Information Center

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community…

  12. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  13. Least-cost utility planning consumer participation manual. [Final report

    SciTech Connect

    Mitchell, C.; Wellinghoff, J.; Goldberg, F.

    1989-12-31

    This manual is designed to provide guidance to state consumer advocates and other state consumer groups interested in either initiating and/or participating in an Least-Cost Utility Planning (LCUP) process in their state. Least cost utility planning examined primarily as a regulatory framework to be implemented by an appropriate state authority -- usually the public utility commission -- for the benefit of the state`s citizens and electric utility customers. LCUP is also a planning process to be used by investor owned and public utilities to select, support and justify future expenditures in resource additions. This manual is designed as a ``How-To`` manual for implementing and participating in a statewide LCUP process. Its goal is to guide the reader through the LCUP maze so that meaningful, forward-looking, and cost minimizing electric utility planning can be initiated and sustained in your state.

  14. Draft Final Ambient Air Monitoring Plan July 2015

    EPA Pesticide Factsheets

    This work plan describes the ambient air sampling program for the New Bedford Harbor Superfund Site and presents the locations, sampling strategies, and exposure limits for monitoring remedial activities in the Harbor.

  15. Proliferation as a framework for adaptive planning. Final report

    SciTech Connect

    Adkins, M.A.

    1993-02-22

    Throughout the forty years of the cold war, the military proficiently demonstrated planning, exercising, and employing against weapons of mass destruction -- specifically nuclear weapons. However, this planning has never targeted the spread of those weapons. The four stages of proliferation (supply, demand, indigenous, threatening) provide a framework for using the adaptive planning concept and identifying proactive military objectives. The existence of nuclear technology, command and control of the weapons of mass destruction, associated moral issues, or the value of assured deterrence between two nuclear weapon states are not addressed. Weapons of mass destruction are the example used to examine the stages of proliferation. Once planning for proliferation of weapons of 'mass destruction has been proven effective, this framework can be applied to other types of proliferants such as narcotic trafficking and transfer of conventional/high technology arms.

  16. Final Work Plan: Targeted Investigation at York, Nebraska

    SciTech Connect

    LaFreniere, Lorraine M.

    2016-08-01

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan, the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.

  17. Offshore petroleum development and the comprehensive planning process. Final report

    SciTech Connect

    Emmer, R.E.; Rheams, A.; Wagner, F.

    1992-11-01

    Outer Continental Shelf petroleum activity began in 1947 when the first well was drilled in the Gulf of Mexico out of sight of land. Communities had the opportunity to plan for what would take place as a result of OCS activities and some did through the Section 701 program. But the Department of Public Works, the parishes, and the municipalities were operating with guidance from obsolete State laws. The State statute that defines the comprehensive plan was based on the Standard City Planning Enabling Act of 1928, which was known to be out of date by the end of World War II. In most instances medium and small communities could not afford full-time planners and did not keep abreast of the changing concepts in planning.

  18. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... Doc No: 2010-4414] DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final... Impact Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the... availability of the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona....

  19. 40 CFR 60.1105 - How do I submit my final materials separation plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... separation plan? 60.1105 Section 60.1105 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance... Requirements: Materials Separation Plan § 60.1105 How do I submit my final materials separation plan? As...

  20. 40 CFR 60.1105 - How do I submit my final materials separation plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... separation plan? 60.1105 Section 60.1105 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance... Requirements: Materials Separation Plan § 60.1105 How do I submit my final materials separation plan? As...

  1. 40 CFR 60.1105 - How do I submit my final materials separation plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... separation plan? 60.1105 Section 60.1105 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance... Requirements: Materials Separation Plan § 60.1105 How do I submit my final materials separation plan? As...

  2. 40 CFR 60.1105 - How do I submit my final materials separation plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... separation plan? 60.1105 Section 60.1105 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance... Requirements: Materials Separation Plan § 60.1105 How do I submit my final materials separation plan? As...

  3. 40 CFR 60.1105 - How do I submit my final materials separation plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... separation plan? 60.1105 Section 60.1105 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of Performance... Requirements: Materials Separation Plan § 60.1105 How do I submit my final materials separation plan? As...

  4. 78 FR 13692 - Clarks River National Wildlife Refuge, KY; Final Comprehensive Conservation Plan/Land Protection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... Plan/Land Protection Plan, and Finding of No Significant Impact for the Environmental Assessment AGENCY... protection plan (LPP), and finding of no significant impact for the environmental assessment for Clarks River... and environmental assessment (Draft CCP/EA). The final CCP/LPP will guide us in managing and...

  5. 77 FR 12877 - Record of Decision for the General Management Plan/Abbreviated Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... National Park Service Record of Decision for the General Management Plan/Abbreviated Final Environmental... Management Plan for New River Gorge National River, West Virginia. The Record of Decision selects the... the Record of Decision selecting Alternative 5 as the approved General Management Plan for New River...

  6. Implementation strategy for the Galveston Bay plan. Final report

    SciTech Connect

    Keller, R.L.; Masterson, C.E.; Mitchell, G.; Polasek, E.G.; Taebel, J.M.

    1994-11-01

    The Plan recommends 82 management actions to be carried out by 20 federal and stage agencies, over 100 local governments and special purpose districts, and other bay users. This report describes how Plan implementation will be led by a newly created Galveston Bay Program (GBP) of the Texas Natural Resource Conservation Commission (TNRCC) and outlines the major roles of other federal, state, and local governments, `stakeholders,` and the public. A summary table of agency responsibilities for each of The Plan`s actions is also included in this document. The report also identifies the possibly enforceable policies in each of The Plan`s actions, and cites the relevant federal and/or state statutory and regulatory basis for enforcement. Additional actions required (if any) to make the policies enforceable are also described. Based on the analysis of enforceable policies, necessary federal and state legislation, Memoranda of Understanding, and local ordinances are identified. The report concludes with a description of how implementation results will be tracked and evaluated.

  7. Wildlife Protection, Mitigation, and Enhancement Plan, Palisades Project: Final Report.

    SciTech Connect

    Meuleman, G. Allyn

    1986-11-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, projects have been developed in Idaho and Wyoming to mitigate the losses of wildlife habitat and annual production due to the development and operation of the Palisades Project. A modified Habitat Evaluation Procedure (HEP) was used to assess the benefits of the preferred mitigation plan to wildlife. The interagency work group used the target species Habitat Units (HU's) lost with inundation of the reservoir area as a guideline during the mitigation planning process, while considering needs of wildlife in eastern Idaho and western Wyoming. A total of 37,068 HU's were estimated to be lost as a result of the inundation of the Palisades Reservoir area. Through a series of protection/enhancement projects, the preferred mitigation plan will provide benefits of an estimated 37,066 HU's. Target species to be benefited by this mitigation plan include bald eagle, mule deer, elk, mallard, Canada goose, mink, yellow warbler, black-capped chickadee, ruffed grouse, and peregrine falcon.

  8. Final work plan : groundwater monitoring at Centralia, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2005-08-31

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at the site of a former grain storage facility at Centralia, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Centralia being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Centralia.

  9. Final work plan : groundwater monitoring at Morrill, Kansas.

    SciTech Connect

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at Morrill, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Morrill being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Morrill.

  10. Exxon Valdez oil spill restoration plan. Final environmental impact statement

    SciTech Connect

    1994-09-01

    The purpose of the proposed action analyzed in this final environmental impact statement (FEIS) is to restore, insofar as possible, the injured natural resources and thereby the services they provide that were affected by the Exxon Valdex oil spill (EVOS). The purpose of this document is to analyze the effects of proposed uses of the remaining funds (approximately $620 million as of February 1994, after final reimbursements) in accomplishing the mission of the Trustee Council.

  11. Manpower Planning Strategies for Emergency Public Employment. Final Report.

    ERIC Educational Resources Information Center

    Rutstein, Jacob J.; Schick, Richard P.

    This report presents a plan indicating how State and local governments might hire the unemployed and the underemployed for government jobs under the provisions of laws such as the Emergency Employment Act. Two major jurisdictions were selected for the field study, the city of Chicago and the State of Connecticut, to represent a broad spectrum of…

  12. Metropolitan Planning Project, 1977-78. Final Performance Report.

    ERIC Educational Resources Information Center

    Arnoff, Steven M.

    This document provides a description of the Metropolitan Planning Project (MPP), its objectives, strategies, and an evaluation of its implementation in the Boston area. In order to encourage the voluntary elimination, reduction, and prevention of minority group isolation in elementary and secondary schools in Boston, the project focuses on two…

  13. Neutral Site Planning Project, Final Report. Volume II: Neighborhood Profiles.

    ERIC Educational Resources Information Center

    Providence School Dept., RI.

    As part of a plan for the development of neutral site magnet schools in Providence, twenty-four individual neighborhoods are profiled in a series of charts and tables which provide demographic, economic, housing, and social service and crime data. The information provided includes ethnic composition, age breakdowns, educational level, income,…

  14. Metropolitan Planning Project, 1977-78. Final Performance Report.

    ERIC Educational Resources Information Center

    Arnoff, Steven M.

    This document provides a description of the Metropolitan Planning Project (MPP), its objectives, strategies, and an evaluation of its implementation in the Boston area. In order to encourage the voluntary elimination, reduction, and prevention of minority group isolation in elementary and secondary schools in Boston, the project focuses on two…

  15. University of Tennessee, Knoxville Library. Preservation Planning Program. Final Report.

    ERIC Educational Resources Information Center

    Bengtson, Betty; And Others

    This report is the result of a year-long preservation planning study at the University of Tennessee-Knoxville Library, during which four task forces investigated the physical condition of the collections, environmental conditions of the libraries, state of disaster preparedness, and organizational issues relating to preservation. Task force…

  16. Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan

    SciTech Connect

    GREAGER, T.M.

    2000-12-06

    The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility.

  17. Self-Planned Learning in America. Final Report.

    ERIC Educational Resources Information Center

    Penland, Patrick R.

    Through a nationally-administered questionnaire and a literature review, this report explores developments in the psychology of self-planned learning. The introduction presents a review of the current literature, hypotheses concerning the motivation and methods of adult learning, and assumptions made for this survey. The questionnaire was…

  18. Vocational Home Economics Instructional Materials Exchange Network Plan. Final Report.

    ERIC Educational Resources Information Center

    Texas Tech Univ., Lubbock. Home Economics Instructional Materials Center.

    A project was undertaken to establish plans for a network through which postsecondary vocational home economics institutions in Texas could exchange instructional materials. After reviewing current literature on the idea of an instructional materials exchange, project staff mailed letters to the Board of Education in each of the 50 states…

  19. Fixture and layout planning for reconfigurable workcells. LDRD final report

    SciTech Connect

    Strip, D.; Phillips, C.

    1994-06-01

    The work in this program covered four primary areas: solid modeling, path planning, modular fixturing, and stability analysis. This report contains highlights of results from the program, references to published reports, and, in an appendix, a currently unpublished report which has been accepted for journal publication, but has yet to appear.

  20. Skyline Wide Educational Plan. Final Evaluation Report 1973-1974.

    ERIC Educational Resources Information Center

    Burns, Robert J.; Allan, Mary Ann

    The purposes of this terminal evaluation report are to determine the extent to which the major goals of the Skyline Wide Educational Plan (SWEP) project were achieved, to evaluate the utility of the products of SWEP studies, and to communicate the results to appropriate audiences. Information relative to four major project components is presented;…

  1. Monthly Planning Manual for Beginning Vocational Agriculture Teachers. Final Report.

    ERIC Educational Resources Information Center

    Miller, Stephen S.; Yoder, Edgar P.

    The purpose of this publication is to aid the beginning teacher of vocational agriculture/agribusiness in planning for the first year as a member of the teaching profession. The manual is organized on a monthly schedule starting with July, since this is often the month when a new vocational agriculture teacher is hired. Each month includes seven…

  2. Comprehensive Development Plan in Office Skills. Final Performance Report.

    ERIC Educational Resources Information Center

    Waubonsee Community Coll., Sugar Grove, IL.

    The Waubonsee Community College Comprehensive Development Plan in Office Skills served 208 students by assessment of basic skills and referral to appropriate programs or help with job skills and referral to employment during the 18-month grant period from December 1988 through June 30, 1990. The target population was minority women or economically…

  3. Clackamas Community College Master Planning Program. Final Report.

    ERIC Educational Resources Information Center

    Thompson Associates, Redwood City, CA.

    A study aimed at the development of alternative solutions to building and campus planning problems of the Clakamas Community College (Oregon City, Oregon) is reported. The two main objectives of the study were: (1) to evaluate the current proposed solution (Community Center Building) to the college's need for a community/student center facility;…

  4. A Comprehensive Approach to Emergency Planning

    ERIC Educational Resources Information Center

    Worsley, Tracy L.; Beckering, Don

    2007-01-01

    It is essential that the traditional emergency management structure be used as a framework for higher education emergency planning. The four phases of emergency management should be reflected in the architecture of all planning efforts. These include "preparedness," "response," "mitigation," and "recovery."…

  5. A Comprehensive Approach to Emergency Planning

    ERIC Educational Resources Information Center

    Worsley, Tracy L.; Beckering, Don

    2007-01-01

    It is essential that the traditional emergency management structure be used as a framework for higher education emergency planning. The four phases of emergency management should be reflected in the architecture of all planning efforts. These include "preparedness," "response," "mitigation," and "recovery."…

  6. Plan for SEPTA's regional metrorail system. Final report

    SciTech Connect

    Vuchic, V.R.; Kikuchi, S.; Bruun, E.C.; Chakroborty, P.; Krstanoski, N.

    1993-04-01

    SEPTA's Regional Rail System has an extensive network of 7 diametrical lines. However, its ridership is only 90,000 per weekday, much lower than the riderships of the recently built regional metrorail systems, such as BART and WMATA. The project developed a plan to upgrade SEPTA's Regional System by construction of high platforms, purchasing new rolling stock and introduction of self-service fare collection. The report represents a plan for upgrading an old commuter rail system, which has high operating costs and cannot attract many passengers because of long headways, into a modern regional metrorail system which will offer better service with decreased operating costs. This upgrading will have a very positive impact on the entire Philadelphia Region. The required investment, although large in absolute terms, is very moderate compared to the investments made by other cities into rail systems with far smaller networks.

  7. SDI (Strategic Defense Initiative) software technology program plan. Final report

    SciTech Connect

    Linn, C.J.; Redwine, S.T.; Bloom, M.I.; Brykczynski, B.; Chludzinski, J.

    1987-06-01

    This paper was prepared in response to a request from the Battle Management C3 office within the Strategic Defense Initiative Organization (SDIO) of the Department of Defense (DoD). The request was for a software-technology program plan to define software research and development (RandD) efforts required by the SDI, and to provide the basis for integrating the SDIO software technology program with ongoing non-SDIO programs. The paper emphasizes reviewing the ongoing software programs and plans within the DoD and academia. The reviews identify critical software technology areas required to meet the unique SDI requirements, and indicate priorities among the software technologies to meet attainability, productivity, and reliability goals, as well as functional performance objectives.

  8. Mississippi DOE EPSCoR planning grant. Final report

    SciTech Connect

    Steele, W.G.

    1996-09-01

    The Mississippi DOE EPSCoR planning grant committee identified three focus areas for a proposal submitted on January 25, 1995, to the US DOE: Human Resource Development, Environmental Synergisms from Fuel Mixtures of Tire Particles and Low Rank Coals, and Energy Efficient Heat Transfer Equipment and Materials. In the human resources are, efforts were undertaken to identify and develop linkages with educational institutions, national laboratories, and industries and to identify strategies for attracting and involving students in areas leading to technical careers. The fuel mixtures project was directed toward developing ways to combine scrap tire particles and lignite coal into a blended fuel that could be used in electric power generation. In the energy efficient heat transfer area, analytical and experimental investigations were planned to increase the efficiency of heat exchangers and insulating materials.

  9. Final Environmental Assessment: For the Eglin Dormitory Master Plan

    DTIC Science & Technology

    2006-03-01

    Response, Compensation, and Liability Act CEQ Council of Environmental Quality CFR Code of Federal Regulations CO Carbon Monoxide CWA Clean Water...SER Significant Emissions Rate SIP State Implementation Plan SO2 Sulfur Dioxide SWDA Safe Water Drinking Act TCLP Toxicity Characteristic Leaching...allowable concentrations for the following criteria pollutants: ozone (O3), carbon monoxide (CO), nitrogen dioxide (NO2), sulfur dioxide (SO2

  10. Omaha District Final Cultural Resource Site Monitoring Plan

    DTIC Science & Technology

    2014-06-01

    person team and a site monitoring schedule to be coordinated with the applicable Omaha District designated representatives. Sites should be accessed ...via public roads and waterways. Monitors should not trespass on private land to access sites. Remote sites should be accessed by foot, boat, jet-ski...DISTRICT JUNE 2014 Page | 6 • Overview of other research methods to collect information on a site • Developing a fieldwork plan • Overview of

  11. Final work plan for targeted sampling at Webber, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2006-05-01

    This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

  12. Methodology development to support NPR strategic planning. Final report

    SciTech Connect

    1996-04-01

    This report covers the work performed in support of the Office of New Production Reactors during the 9 month period from January through September 1990. Because of the rapid pace of program activities during this time period, the emphasis on work performed shifted from the strategic planning emphasis toward supporting initiatives requiring a more immediate consideration and response. Consequently, the work performed has concentrated on researching and helping identify and resolve those issues considered to be of most immediate concern. Even though they are strongly interrelated, they can be separated into two broad categories as follows: The first category encompasses program internal concerns. Included are issues associated with the current demand for accelerating staff growth, satisfying the immediate need for appropriate skill and experience levels, team building efforts necessary to assure the development of an effective operating organization, ability of people and organizations to satisfactorily understand and execute their assigned roles and responsibilities, and the general facilitation of inter/intra organization communications and working relationships. The second category encompasses program execution concerns. These include those efforts required in development of realistic execution plans and implementation of appropriate control mechanisms which provide for effective forecasting, planning, managing, and controlling of on-going (or soon to be) program substantive activities according to the master integrated schedule and budget.

  13. Comprehensive Approach to Pupil Planning: Stage II - Planning and Placement (Includes Planning and Placement Team Meeting Agenda). Experimental Edition.

    ERIC Educational Resources Information Center

    Vlasak, Frances Stetson; Kaufman, Martin J.

    Presented is Stage II of the Comprehensive Approach to Pupil Planning (CAPP) System, a three-stage model for planning educational interventions in the regular and special education classrooms and for guiding placement decisions. The guide focuses on the evaluation services performed by the Planning and Placement Team (PPT) with sections on the…

  14. The NASA planning process, appendix D. [as useful planning approach for solving urban problems

    NASA Technical Reports Server (NTRS)

    Annett, H. A.

    1973-01-01

    The planning process is outlined which NASA used in making some fundamental post-Apollo decisions concerning the reuseable space shuttle and the orbiting laboratory. It is suggested that the basic elements and principles of the process, when combined, form a useful planning approach for solving urban problems. These elements and principles are defined along with the basic strengths of the planning model.

  15. A multi-model deployment planning problem. Final report

    SciTech Connect

    Lawphongpanich, S.; Rosenthal, R.E.

    1989-09-01

    This report considers a multi-modal deployment planning problem in which movement requirements are allowed to originate from (supply) centers, ground transported to (sea or air) ports of embarkation, and, upon arrival at (sea or air) ports of debarkation, ground transported again to (demand) centers or destinations. This sequence of movements involves all three modes of transportation: air, land, and sea. The authors formulate this deployment problem as an integer program which has a columnar structure and allows for many different objectives. The complexity of this program along with optimality properties for its solutions are discussed. A heuristic solution procedure is also proposed.

  16. An optimal setup planning selection approach in a complex product machining process

    NASA Astrophysics Data System (ADS)

    Zhu, Fang

    2011-10-01

    Setup planning has very important influence on the product quality in a Complex Product Machining Process (CPMP). Part production in a CPMP involves multiple setup plans, which will lead into variation propagation and lead to extreme complexity in final product quality. Current approaches of setup planning in a CPMP are experience-based that lead to adopt higher machining process cost to ensure the final product quality, and most approaches are used for a single machining process. This work attempts to solve those challenging problems and aims to develop a method to obtain an optimal setup planning in a CPMP, which can satisfies the quality specifications and minimizes the expected value of the sum of machining costs. To this end, a machining process model is established to describe the variation propagation effect of setup plan throughout all stages in a CPMP firstly and then a quantitative setup plan evaluation methods driven by cost constraint is proposed to clarify what is optimality of setup plans. Based on the above procedures, an optimal setup planning is obtained through a dynamic programming solver. At last, a case study is provided to illustrate the validity and the significance of the proposed setup planning selective method.

  17. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    L. O. Nelson

    2003-09-01

    This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

  18. Mississippi DOE EPSCoR planning grant. Final report

    SciTech Connect

    Steele, W.G.

    1994-08-01

    The Mississippi DOE EPSCoR planning grant committee identified four focus areas for a proposal submitted on March 1, 1993 to the DOE: Human Resource Development, Clean Coal for Fluidized Bed Coal Combustion, Environmental Restoration and Waste Management, and Energy Efficient Heat Transfer Equipment and Materials. In the human resources area, efforts were undertaken to identify and develop linkages with educational institutions, national laboratories, and industries and to identify strategies for attracting and involving students in areas leading to technical careers. The clean coal project was directed toward beneficiating coals, measuring efficiencies of the various beneficiation methods, measuring the flue gas components both before and after beneficiations, and modeling the production of soot and of NO{sub x} and SO{sub x}. The environmental restoration project was focused on methods to sample and characterize waste dump sites at nuclear processing plants and on ways to convert the waste into safe materials. In the energy efficient heat transfer area, analytical and experimental investigations were planned to increase the efficiency of heat exchangers and insulating materials.

  19. An innovative approach of risk planning for space programs.

    PubMed

    Ray, P

    2000-07-01

    According to the current rule-based risk management approach at the National Aeronautics and Space Administration (NASA), the effort is directed to contain all identified risks of a program. The identification of hazards and mitigation effort proceeds along with the development of the system hardware, till all the tradable resources for a program is exhausted. In this process, no conscious effort is made to evaluate risks and associated cost, and the final design is likely to have undesirable residual risks. This approach also results in allocating a significant amount of resources to gain only marginal mitigation of hazard and leave some undesirable hazards in the system due to the budget limitation. The approach in the proposed knowledge-based risk planning system makes a conscious attempt to trade risk with other resources, e.g., schedule, cost, reliability, performance, and others in a judicious and cost-effective way. A knowledge of the feasible option sets requiring high incremental cost for a marginal gain in hazard reduction helps the management to make decision for residual risk that falls within an acceptable range for an option set.

  20. North Coast Unified Air Quality Management District, California; Final Limited Federal Implementation Plan

    EPA Pesticide Factsheets

    EPA is finalizing a limited Federal Implementation Plan (FIP) under the Clean Air Act (CAA or Act) to apply to the North Coast Unified Air Quality Management District (North Coast Unified AQMD or District) in California.

  1. Simulated final approach path captures using the microwave landing system

    NASA Technical Reports Server (NTRS)

    Feather, J. B.

    1988-01-01

    Computer simulation results are presented for intercepting final approach paths using various Microwave Landing System (MLS) path capture concepts. This study, conducted under the Advanced Transport Operating System (ATOPS) program, simulated these captures using the MD-80 aircraft as the study model. Several different capture concepts were investigated. Systems that could be retrofitted into existing aircraft with minimum hardware and software changes were considered. An enhanced ILS look-alike capture provided improved tracking performance over conventional ILS without using a full-up path computer. The other concepts used waypoint databases and path computers to provide smart captures. These captures included lateral path intercepts as well as vertical path control. Winds, turbulence, and MLS noise were included in the simulation. In all cases, acceptable tracking errors were obtained during transition to the final approach path.

  2. A Final Approach Trajectory Model for Current Operations

    NASA Technical Reports Server (NTRS)

    Gong, Chester; Sadovsky, Alexander

    2010-01-01

    Predicting accurate trajectories with limited intent information is a challenge faced by air traffic management decision support tools in operation today. One such tool is the FAA's Terminal Proximity Alert system which is intended to assist controllers in maintaining safe separation of arrival aircraft during final approach. In an effort to improve the performance of such tools, two final approach trajectory models are proposed; one based on polynomial interpolation, the other on the Fourier transform. These models were tested against actual traffic data and used to study effects of the key final approach trajectory modeling parameters of wind, aircraft type, and weight class, on trajectory prediction accuracy. Using only the limited intent data available to today's ATM system, both the polynomial interpolation and Fourier transform models showed improved trajectory prediction accuracy over a baseline dead reckoning model. Analysis of actual arrival traffic showed that this improved trajectory prediction accuracy leads to improved inter-arrival separation prediction accuracy for longer look ahead times. The difference in mean inter-arrival separation prediction error between the Fourier transform and dead reckoning models was 0.2 nmi for a look ahead time of 120 sec, a 33 percent improvement, with a corresponding 32 percent improvement in standard deviation.

  3. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    SciTech Connect

    LaFreniere, L. M.

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  4. Standard review plan for dry cask storage systems. Final report

    SciTech Connect

    1997-01-01

    The Standard Review Plan (SRP) For Dry Cask Storage Systems provides guidance to the Nuclear Regulatory Commission staff in the Spent Fuel Project Office for performing safety reviews of dry cask storage systems. The SRP is intended to ensure the quality and uniformity of the staff reviews, present a basis for the review scope, and clarification of the regulatory requirements. Part 72, Subpart B generally specifies the information needed in a license application for the independent storage of spent nuclear fuel and high level radioactive waste. Regulatory Guide 3.61 {open_quotes}Standard Format and Content for a Topical Safety Analysis Report for a Spent Fuel Dry Storage Cask{close_quotes} contains an outline of the specific information required by the staff. The SRP is divided into 14 sections which reflect the standard application format. Regulatory requirements, staff positions, industry codes and standards, acceptance criteria, and other information are discussed.

  5. Instrument and control technician curriculum planning guide. Final report

    SciTech Connect

    Hull, D.M.; Rinard, B.F.

    1981-03-01

    The Instrumentation and Control Technician (ICT) Curriculum Planning Guide is one of three such guides developed as part of project RP 1266-6, Educational Research in Solid-Fuel Technology. The first phase of this project included a needs assessment survey to determine the number of entry-level employees required as Instrumentation and Control Technicians. The need for 6000 technicians over the next decade warrants the development of a specialized ICT curriculum. A detailed task inventory of the skills and knowledge used by Instrumentation and Control Technicians in the safe and efficient performance of their jobs has been completed. The task inventory forms the basis for the model two-year (six-quarter) curriculum presented in this document. Course and module outlines are included which have been formulated to provide students with entry-level skills and the background necessary for further advancement.

  6. Planning School Desegregation: A Working Note. Final Report.

    ERIC Educational Resources Information Center

    Keeler, Emmett

    A methodology for busing to achieve school desegregation is described. Two different approaches are proposed: a student interracial contact score and a quota method. Travel time and number of children bused are proxies for busing costs. Useful data include travel time, school capacity, and student residences for each region and level of school. A…

  7. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Management Planning at the Kerr Hydroelectric Project, Flathead Lake, Montana, is now available for public... Bureau of Indian Affairs Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice...

  8. 78 FR 34402 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Fish and Wildlife Service Final Environmental Impact Statement, Habitat Conservation Plan, and...-species habitat conservation plan (MSHCP) to cover a suite of activities associated with operation...

  9. [Final Resolutions Adopted by the Conference on Planning of Rural Areas in Europe, 7 October 1978].

    ERIC Educational Resources Information Center

    Council of Europe, Strasbourg (France).

    Two final resolutions were adopted by the Council of Europe at the October 1978 European Conference of Ministers Responsible for Regional Planning. Resolution 1 focused on guidelines for the planning of rural areas in Europe. Strategies and policies called for: a more balanced development which makes the living conditions of different regions as…

  10. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Bureau of Land Management Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management... of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the...

  11. Energy planning for development - needs and approaches

    SciTech Connect

    Mubayi, V

    1981-01-01

    The capability of developing countries to carry out comprehensive national energy planning is examined. The analytical methods or models constructed for analyzing the energy system have to take into account the specific context in which they are built to address issues of interest to development planners. Issues discussed are resource development and technology research, energy equity considerations to all peoples in a nation, the pricing policy, and the balance of payments considerations. The impartance of the availability of adequate skilled personnel and training programs to impart the requisite skill necessary to carry out the planning is discussed. Various surveys were conducted to determine the training needs for energy planners in developing countries. (MCW)

  12. Exxon Valdez restoration plan. summary of the final environmental impact statement

    SciTech Connect

    1994-09-01

    The Exxon Valdez Trustee Council issued a draft Restoration Plan in November of 1993. The draft Restoration Plan provides long-term guidance for restoring the resources and services injured by the Exxon Valdez Oil Spill of March 24, 1989. This final Environmental Impact Statement (FEIS) analyzes the potential environmental impacts of the draft Restoration Plan as the Proposed Action - Alternative 5, and four other alternatives that provide different policies and emphasis than the proposed action.

  13. Planning for Growth: A Nontraditional Approach

    ERIC Educational Resources Information Center

    Hagemeyer, Richard H.

    1975-01-01

    Central Piedmont Community College (North Carolina) has sought an alternative to building new campuses to meet the increasing demands for its services. Various non-traditional delivery systems, including satellite centers, cable TV, teleconference networks, and strengthened off-campus audiovisual and library support services, are planned to expand…

  14. A Framegame Approach to Equity Planning.

    ERIC Educational Resources Information Center

    Dillon, Linda S.

    A study was conducted to develop a model that would promote sex equity by increasing the enrollment of nontraditional sex membership in occupational education programs at North Carolina community colleges. In order to gather input from the colleges involved as well as educational and community leaders, a series of three conferences was planned to…

  15. Integrative Life Planning: A Holistic Approach

    ERIC Educational Resources Information Center

    Hansen, Sunny Sundal

    2011-01-01

    This article presents a brief description of integrative life planning (ILP), the career theory/concept created in the 1990s by the author. It describes what she calls "the heart of ILP," the 6 critical life tasks and their applications.

  16. Integrative Life Planning: A Holistic Approach

    ERIC Educational Resources Information Center

    Hansen, Sunny Sundal

    2011-01-01

    This article presents a brief description of integrative life planning (ILP), the career theory/concept created in the 1990s by the author. It describes what she calls "the heart of ILP," the 6 critical life tasks and their applications.

  17. Planning in Higher Education: Approaches and Problems

    ERIC Educational Resources Information Center

    Vaccaro, Louis C.

    1976-01-01

    A college president discusses long-range planning in a private college and suggests problems and difficulties confronting those responsible for it emphasizing the critical ingredient of presidential leadership qualities that stimulate a spirit of dialogue and philosophizing about the nature, aims, and objectives of the institution. (JT)

  18. Finalizing the Libby Action Plan Research Program | Science ...

    EPA Pesticide Factsheets

    Libby, Montana is the location of a former vermiculite mine that operated from 1923 to 1990. The vermiculite ore from the mine co-existed with amphibole asbestos, referred to as Libby Amphibole Asbestos (LAA). Combined with the cessation of the asbestos mining and processing operations, there has been significant progress in reducing the exposure to LAA in Libby, Montana. In 2009, the U.S Environmental Protection Agency (EPA) jointly with the Department of Health and Human Services (DHHS) declared a public health emergency in Libby due to observed asbestos-related health effects in the region. As part of this effort, the EPA led a cross-agency research program that conducted analytical, toxicological, and epidemiological research on the health effects of asbestos at the Libby Asbestos Superfund Site (Libby Site) in Libby, Montana. The Libby Action Plan (LAP) was initiated in 2007 to support the site-specific risk assessment for the Libby Site. The goal of the LAP research program was to explore the health effects of LAA, and determine toxicity information specific to LAA in order to accurately inform a human health risk assessment at the Libby Site. LAP research informed data gaps related to the health effects of exposure to LAA, particularly related to specific mechanisms of fiber dosimetry and toxicity (e.g., inflammatory responses), as well as investigated disease progression in exposed populations and advanced asbestos analytical techniques. This work incl

  19. Final work plan for targeted investigation at Hilton, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2007-08-28

    This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

  20. Wildlife Protection, Mitigation, and Enhancment Plan: Minidoka Dam: Final Report.

    SciTech Connect

    Meuleman, G. Allyn; Martin, Robert C.; Hansen, H. Jerome

    1991-04-01

    A wildlife protection, mitigation, and enhancement plan has been developed for the US Bureau of Reclamation's Minidoka Dam and Reservoir in south-central Idaho. Specific objectives of this study included the following: Develop protection, mitigation, and enhancement goals and objectives for target wildlife species; identify potential protection, mitigation, and enhancement opportunities to achieve the mitigation objectives; and coordinate project activities with agencies, tribes, and the public. The interagency work group previously assessed the impacts of Minidoka Dam on wildlife. There were estimated losses of 10,503 habitat units (HU's) for some target wildlife species and gains of 5,129 HU's for other target species. The work group agreed that mitigation efforts should be directed toward target species that were negatively impacted by Minidoka Dam. They developed the following prioritized mitigation goals: 1,531 river otter HU's in riparian/river habitat, 1,922 sage grouse HU's in shrub-steppe (sagebrush-grassland) habitat, 1,746 mule deer HU's in shrub-steppe habitat, and 175 yellow warbler HU's in deciduous scrub-shrub wetland habitat. The work group proposed the following preferred mitigation options, in priority order: Provide benefits of 1,706 river otter and yellow warbler HU's by protecting and enhancing riparian/river habitat in south central Idaho; and provide benefits of 3,668 sage grouse and mule deer HU's by protecting and enhancing shrub-steppe (sagebrush-grassland) habitat. 38 refs., 2 figs., 5 tabs.

  1. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  2. The dosimetric comparison of the radiotherapeutic plans between composite and synchronous planning approaches in sequential IMRT for nasopharyngeal carcinoma

    PubMed Central

    Zhou, Gang; Sun, Yanze; Qian, Jianjun; Tian, Ye; Lu, Xueguan

    2015-01-01

    The aim of present study was to compare the dosimetric differences of the radiotherapeutic plans between synchronous and composite planning approaches in sequential intensity-modulated radiation therapy (IMRT) for nasopharyngeal carcinoma (NPC). Twelve patients with NPC treated by sequential IMRT were enrolled. Two planning approaches were used to design sequential IMRT plan. The first was composite planning approach, in which the initial and boost plans were designed and optimized independently. The second was synchronous planning approach, in which the boost IMRT plan was designed on foundation of the initial IMRT plan, and its optimization would be adjusted based on dose distributions of the initial IMRT plan. Dosimetric comparisons in IMRT plans between composite and synchronous planning approaches were analyzed to evaluate (1) dose coverage, conformity, and homogeneity of the planning target volume (PTV), (2) sparing of organs at risk (OARs), and (3) the number of segments and monitor units (MUs). The results showed that both of the summed plans for the entire treatment course were achieved according to the original planning goals, and the dose coverage, conformity and homogeneity for each PTV was similar. With regard to sparing brain stem, spinal cord and parotid glands, there was no significant difference in the summed plans between two planning approaches. However, the boost IMRT plan by composite planning approach tended to have a higher dose coverage (P = 0.000), conformity (P = 0.000), and homogeneity (P = 0.000) than that of the plan by synchronous planning approach. Moreover, the boost plan by composite planning approach reduced the MUs significantly (P = 0.000). The results indicated that the radiotherapeutic plan by composite planning approach provides better dose coverage, conformity and homogeneity for the PTV in the boost plan than that by synchronous planning approach, and reduced MUs in sequential intensity modulated radiotherapy. PMID:26629101

  3. Final work plan for targeted investigation at Inman, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2007-11-05

    In 1997, low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5 {micro}g/L) were detected in groundwater at Inman, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1997 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Inman from 1954 to 1965. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Inman is located in southwest McPherson County, approximately 10 mi southwest of the city of McPherson (Figure 1.1). To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation at Inman, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. For this work plan, Argonne compiled historical data related to the previous investigations and grain storage operations at Inman. Through a review of documents acquired from all available sources, other potential contaminant source areas (in addition to the former CCC/USDA facility) have been identified as (1) the commercial grain storage structures northwest of Inman, along the railroad right-of-way, and (2) small former private grain storage facilities west of Main Street and near the former CCC/USDA facility at the southern edge of Inman (Figure 1.2). Previous investigations and the potential source areas are discussed in Section 2.

  4. Final Work Plan: Phase I Investigation at Bladen, Nebraska

    SciTech Connect

    LaFreniere, Lorraine M.; Yan, Eugene

    2014-07-01

    The village of Bladen is a town of population approximately 237 in the northwest part of Webster County, Nebraska, 30 mi southwest of Hastings and 140 mi southwest of Lincoln, Nebraska. In 2000, the fumigant-related compound carbon tetrachloride was detected in public water supply well PWS 68-1, at a trace level. Low-level contamination, below the maximum contamination level (MCL) of 5.0 μg/L, has been detected intermittently in well PWS 68-1 since 2000, including in the last sample taken in July 2013. In 2006, the village installed a new well, PWS 2006-1, that remains free of contamination. Because the carbon tetrachloride found in well PWS 68-1 might be linked to historical use of fumigants containing carbon tetrachloride at grain storage facilities, including its former facility in Bladen, the CCC/USDA is proposing an investigation to (1) delineate the source and extent of the carbon tetrachloride contamination potentially associated with its former facility, (2) characterize pathways and controlling factors for contaminant migration in the subsurface, and (3) establish a basis for estimating potential health and environmental risks. The work will be performed in accordance with the Intergovernmental Agreement established between the NDEQ and the Farm Service Agency of the USDA. The site investigation at Bladen will be implemented in phases, so that data collected and interpretations developed during each phase can be evaluated to determine if a subsequent phase of investigation is warranted and, if warranted, to provide effective guidance for the subsequent investigation activities. This Work Plan identifies the specific technical objectives and defines the scope of work proposed for the Phase I investigation by compiling and evaluating historical data. The proposed investigation activities will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research

  5. Optimization approaches to volumetric modulated arc therapy planning.

    PubMed

    Unkelbach, Jan; Bortfeld, Thomas; Craft, David; Alber, Markus; Bangert, Mark; Bokrantz, Rasmus; Chen, Danny; Li, Ruijiang; Xing, Lei; Men, Chunhua; Nill, Simeon; Papp, Dávid; Romeijn, Edwin; Salari, Ehsan

    2015-03-01

    Volumetric modulated arc therapy (VMAT) has found widespread clinical application in recent years. A large number of treatment planning studies have evaluated the potential for VMAT for different disease sites based on the currently available commercial implementations of VMAT planning. In contrast, literature on the underlying mathematical optimization methods used in treatment planning is scarce. VMAT planning represents a challenging large scale optimization problem. In contrast to fluence map optimization in intensity-modulated radiotherapy planning for static beams, VMAT planning represents a nonconvex optimization problem. In this paper, the authors review the state-of-the-art in VMAT planning from an algorithmic perspective. Different approaches to VMAT optimization, including arc sequencing methods, extensions of direct aperture optimization, and direct optimization of leaf trajectories are reviewed. Their advantages and limitations are outlined and recommendations for improvements are discussed.

  6. Implementation planning for industrial energy conservation: approach and methodology

    SciTech Connect

    Alston, T.G.; Falk, G.; Grogan, P.J.; Katz, D.; Tatar, J.

    1981-01-01

    Details of an industry-specific Conservation Technology Implementation Branch implementation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented. (MCW)

  7. Optimization approaches to volumetric modulated arc therapy planning

    SciTech Connect

    Unkelbach, Jan Bortfeld, Thomas; Craft, David; Alber, Markus; Bangert, Mark; Bokrantz, Rasmus; Chen, Danny; Li, Ruijiang; Xing, Lei; Men, Chunhua; Nill, Simeon; Papp, Dávid; Romeijn, Edwin; Salari, Ehsan

    2015-03-15

    Volumetric modulated arc therapy (VMAT) has found widespread clinical application in recent years. A large number of treatment planning studies have evaluated the potential for VMAT for different disease sites based on the currently available commercial implementations of VMAT planning. In contrast, literature on the underlying mathematical optimization methods used in treatment planning is scarce. VMAT planning represents a challenging large scale optimization problem. In contrast to fluence map optimization in intensity-modulated radiotherapy planning for static beams, VMAT planning represents a nonconvex optimization problem. In this paper, the authors review the state-of-the-art in VMAT planning from an algorithmic perspective. Different approaches to VMAT optimization, including arc sequencing methods, extensions of direct aperture optimization, and direct optimization of leaf trajectories are reviewed. Their advantages and limitations are outlined and recommendations for improvements are discussed.

  8. Implementation planning for industrial energy conversation: Approach and methodology

    NASA Astrophysics Data System (ADS)

    Alston, T. G.; Falk, G.; Grogan, P. J.; Katz, D.; Tatar, J.

    1981-01-01

    Details of an industry-specific Conservation Technology Implementation Branch implemenation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/ paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented.

  9. Forest management planning for timber production: a sequential approach

    Treesearch

    Krishna P. Rustagi

    1978-01-01

    Explicit forest management planning for timber production beyond the first few years at any time necessitates use of information which can best be described as suspect. The two-step approach outlined here concentrates on the planning strategy over the next few years without losing sight of the long-run productivity. Frequent updating of the long-range and short-range...

  10. General Education Assessment Plan: A Four-Tiered Approach

    ERIC Educational Resources Information Center

    McLawhon, Ryan; Phillips, Loraine H.

    2013-01-01

    Planning is possibly the most important step of the assessment process. This article presents a four-tiered approach to designing and implementing a general education institutional assessment plan. Categorizing the measures you use to assess established learning outcomes helps you prioritize your general education assessment initiatives and keep…

  11. Information Literacy Planning for Educators: The ILPO Approach.

    ERIC Educational Resources Information Center

    Ryan, Jenny; Capra, Steph

    2001-01-01

    Describes the ILPO (Information Literacy Planning Overview) that combines facets of information literacy including critical thinking, problem solving, and information technology into a planning document to support teachers and teacher-librarians. Discusses the whole-school approach to integrating information literacy into the curriculum that has…

  12. 26. Southern approach span showing detail plan, elevation, and existing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Southern approach span showing detail plan, elevation, and existing views for pier and abutment structural changes required after flood of December 1955. - Moody Bridge, Spanning South Fork Eel River, Garberville, Humboldt County, CA

  13. 21. Southern approach span plan and elevation views for pier ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Southern approach span plan and elevation views for pier and abutment structural changes required after flood of December 1955 on Moody Bridge. - Moody Bridge, Spanning South Fork Eel River, Garberville, Humboldt County, CA

  14. Final monitoring plan for site restoration at Murdock, Nebraska.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2006-02-28

    In early 2005, Argonne National Laboratory conducted an Engineering Evaluation/Cost Analysis (EE/CA; Argonne 2005b) to address carbon tetrachloride contamination identified in groundwater and surface water at Murdock, Nebraska, approximately 22 mi east-northeast of Lincoln (Figure 1.1). The EE/CA study was performed for the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA), as the technical basis for a proposed removal action for the Murdock site. The EE/CA was conducted in compliance with an Administrative Order on Consent issued for Murdock by the U.S. Environmental Protection Agency (EPA 1991). Three removal action alternatives were examined through the use of site-specific data and predictive simulations of groundwater flow and contaminant transport performed with calibrated numerical models. The alternatives were evaluated individually and compared against performance criteria established under the National Oil and Hazardous Substances Pollution Contingency Plan and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). On the basis of these evaluations, an alternative employing phytoremediation in conjunction with seasonal groundwater extraction and treatment by spray irrigation was recommended by the CCC/USDA to permanently reduce the carbon tetrachloride contaminant levels in groundwater and surface water at the site. The proposed alternative is being implemented in cooperation with the EPA. Under the direction of the CCC/USDA and the EPA, implementation of the chosen removal action occurred in phases, beginning in April 2005. Installation of all the required remediation systems was completed by the end of August 2005. Specific technical objectives of the removal action are as follows: (1) To eliminate pathways for potential human exposure to carbon tetrachloride concentrations above the regulatory limit of 44.2 {micro}g/L in surface water at the site. (2) To minimize or eliminate any detrimental

  15. The indexed time table approach for planning and acting

    NASA Technical Reports Server (NTRS)

    Ghallab, Malik; Alaoui, Amine Mounir

    1989-01-01

    A representation is discussed of symbolic temporal relations, called IxTeT, that is both powerful enough at the reasoning level for tasks such as plan generation, refinement and modification, and efficient enough for dealing with real time constraints in action monitoring and reactive planning. Such representation for dealing with time is needed in a teleoperated space robot. After a brief survey of known approaches, the proposed representation shows its computational efficiency for managing a large data base of temporal relations. Reactive planning with IxTeT is described and exemplified through the problem of mission planning and modification for a simple surveying satellite.

  16. Bonneville Power Administration Fish & Wildlife Implementation Plan Final Environmental Impact Statement

    SciTech Connect

    N /A

    2003-05-09

    The Pacific Northwest has long prided itself on its bountiful and diverse natural resources--its forests and grasslands, minerals and rivers, fish and wildlife. The Region has also relied on these natural resources to serve multiple, and sometimes conflicting, uses. The independent demands of the whole spectrum of human uses (such as irrigation, municipal water supplies, grazing, fishing and hunting, electric power production, recreation, timber harvest, and transportation) have placed increasing stress on the natural resources of the Columbia River Basin. One consequence is that, over the last decade, the number of fish and wildlife species listed as endangered or threatened under the Endangered Species Act (ESA) has dramatically increased. The Region has sought to stem and even reverse the species decline. Unfortunately, after a decade of good intentions, there has been less progress than is necessary to reverse this trend. Here are the most important reasons: (1) Different groups have different value judgments about priorities, leading to different (and often conflicting) ideas about what recovery and mitigation efforts should be. (2) There is no clear and agreed-upon scientific answer to the problem. (3) Conflicting directives and jurisdictions of regional authorities have meant that funds dedicated to fish and wildlife mitigation and recovery efforts have often been used less efficiently and effectively than they otherwise could have been. Recently, regional entities have taken steps to work together to develop a comprehensive and coordinated planning approach for species recovery and mitigation. For example, over the past several years the Council's Columbia River Basin Fish and Wildlife Program, the Recommendations for the Protection and Restoration of Fish In The Columbia River Basin by the Governors of the four Northwestern States, and the Federal Caucus' Conservation of Columbia Basin Fish: Final Basinwide Salmon Recovery Strategy (Basinwide Strategy

  17. A Piloted Simulation Study of Wake Turbulence on Final Approach

    NASA Technical Reports Server (NTRS)

    Stewart, Eric C.

    1998-01-01

    A piloted simulation study has been conducted in a research simulator to provide a means to estimate the effects of different levels of wake turbulence on final approach. A worst-case methodology was used to ensure conservative estimates. Fourteen airline pilots voluntarily participated in the study and flew almost 1000 approaches. The pilots rated the subjective severity of the disturbances using a special rating scale developed for this study. Several objective measures of the airplane/pilot response to the simulated wake turbulence were also made. All the data showed a large amount of variation between pilots and to a lesser extent for a given pilot. Therefore, the data were presented at 50, 70, 90 percentile levels as a function of vortex strength. The data allow estimates of the vortex strength for a given subjective or objective response and vice versa. The results of this study appear to be more conservative than the results of previous studies.

  18. BUBBLES: an Automated Decision Support System for Final Approach Controllers

    NASA Technical Reports Server (NTRS)

    Chi, Zhizang

    1990-01-01

    With the assumptions that an explicit schedule exists for landings (and takeoffs) at each runway, that each aircraft has declared an IAS for final approach and will be obligated to fly it as accurately as possible, and that there is a continuous estimate of average windspeed on approach, the objective was to provide automated cues to assist controllers in the spacing of landing aircraft. The cues have two characteristics. First, they are adaptive to estimation errors in position and speed by the radar tracking process and piloting errors in the execution of turns and commanded speed reductions. Second, the cues are responsive to the desires of the human controller. Several diagrams are used to help explain the system.

  19. Cluster approach allows budgeting, planning with DRGs.

    PubMed

    Grimaldi, P L

    1984-01-01

    Measuring costs and revenues on a diagnosis related group (DRG) basis allows health care managers to define product lines, identify market shares, and examine the effects of case mix and physician behavior on profitability. It also enables public agencies to predict bed needs and evaluate certificate-of-need applications. The large number of DRGs, however, and other managerial considerations may discourage the use of DRG-based budgeting and planning. To save time and enhance data usefulness, financial officers may consolidate the DRGs into fewer groups. Revenue, for example, can be estimated by grouping the DRGs into 23 major diagnostic categories or by clustering them according to cost weight or into one group. Comparisons of payment rates and costs will identify the DRGs that lose money and will determine whether departmental costs are excessive. Strategic planning units formed from the 468 DRGs will help health care managers analyze and project performance. Product lines for this purpose may be clustered according to major diagnostic category, physician specialty, or clinical department. Since a potentially enormous amount of DRG-based clinical and financial information could be generated, hospitals should create data committees to ensure that managers receive only the information they need.

  20. An Approach to Software Product Line Acquisition Planning

    DTIC Science & Technology

    2016-06-13

    Approaches Referring to presentation by John Bergey, the three approaches are • Commission a government organization to develop the product line...2009 Carnegie Mellon University An Approach to Software Product Line Acquisition Planning Army Product Line Workshop Orlando, Florida 12 February...FEB 2009 2. REPORT TYPE 3. DATES COVERED 00-00-2009 to 00-00-2009 4. TITLE AND SUBTITLE An Approach to Software Product Line Acquisition

  1. Health Workforce Planning: An overview and suggested approach in Oman.

    PubMed

    Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M

    2015-02-01

    In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested.

  2. Spatial Planning: A Configuration Space Approach.

    DTIC Science & Technology

    1980-12-01

    Stanford Robot Arm.’ Stmtnt’td Artificial itelligence 1 ah(:ralory, 1974. 14-i W~illiamns. .1. SlICKS -a it nw approach to I SI design. SNI T hesis, I...AD-A093 93& MASSACHUETTSN INST AOF TECH CAMBRIDGE ARTIFICIAL INTE-ETC F/6 9/2 SPATIAL PIANN1NG: A CONFIGUORATION SPACE APPROACH.(U) DEC 80 T LOZANA...AND ADDRESS 10. PROGRAM ELEMENT. PROJECT. TASK Artificial Intelligence Laboratoryv AREA & WORK UNIT NUMBERS 545 Technology Square Cambridge

  3. A global path planning approach for redundant manipulators

    NASA Technical Reports Server (NTRS)

    Seereeram, Sanjeev; Wen, J.

    1993-01-01

    A new approach for global path planning of redundant manipulators is proposed. It poses the path planning problem as a finite time nonlinear control problem. The solution is found by a Newton-Raphson type algorithm. This technique is capable of handling various goal task descriptions as well as incorporating both joint and task space constraints. The algorithm has shown promising preliminary results in planning joint path sequences for 3R and 4R planar robots to meet Cartesian tip tracking and goal endpoint planning. It is robust with respect to local path planning problems such as singularity considerations and local minimum problems. Repetitive joint path solutions for cyclic end-effector tasks are also generated. Eventual goals of this work include implementation on full spatial robots, as well as provision of an interface for supervisory input to aid in path planning for more complex problems.

  4. [Communicative approach of Situational Strategic Planning at the local level: health and equity in Venezuela].

    PubMed

    Heredia-Martínez, Henny Luz; Artmann, Elizabeth; Porto, Silvia Marta

    2010-06-01

    The article discusses the results of operationalizing Situational Strategic Planning adapted to the local level in health, considering the communicative approach and equity in a parish in Venezuela. Two innovative criteria were used: estimated health needs and analysis of the actors' potential for participation. The problems identified were compared to the corresponding article on rights in the Venezuelan Constitution. The study measured inequalities using health indicators associated with the selected problems; equity criteria were incorporated into the action proposals and communicative elements. Priority was assigned to the problem of "low case-resolving capacity in the health services network", and five critical points were selected for the action plan, which finally consisted of 6 operations and 21 actions. The article concludes that the combination of epidemiology and planning expands the situational explanation. Incorporation of the communicative approach and the equity dimension into Situational Strategic Planning allows empowering health management and helps decrease the gaps from inequality.

  5. Continuation coverage requirements applicable to group health plans. Internal Revenue Service (IRS). Treasury. Final rule.

    PubMed

    1999-02-03

    The Consolidated Omnibus Budget Reconciliation Act of 1985 (COBRA) added health care continuation requirements that apply to group health plans. Coverage required to be provided under those requirements is referred to as COBRA continuation coverage. Proposed regulations interpreting the COBRA continuation coverage requirements were published in the Federal Register of June 15, 1987 and of January 7, 1998. This document contains final regulations based on these two sets of proposed regulations. The final regulations also reflect statutory amendments to the COBRA continuation coverage requirements since COBRA was enacted. A new set of proposed regulations addressing additional issues under the COBRA continuation coverage provisions is being published elsewhere in this issue of the Federal Register. The regulations will generally affect sponsors of and participants in group health plans, and they provide plan sponsors and plan administrators with guidance necessary to comply with the law.

  6. The Team Approach to Planning a College Science Building.

    ERIC Educational Resources Information Center

    Yarbrough, David B.

    In considering the team approach to architectural service, emphasis is given to the advantages of many specialists working together to solve complex building problems. An actual use of the team approach is described to illustrate how Caudill, Rowlett and Scott Architects solved the problems in planning a science building for Colorado College. The…

  7. Network-Oriented Approach to Distributed Generation Planning

    NASA Astrophysics Data System (ADS)

    Kochukov, O.; Mutule, A.

    2017-06-01

    The main objective of the paper is to present an innovative complex approach to distributed generation planning and show the advantages over existing methods. The approach will be most suitable for DNOs and authorities and has specific calculation targets to support the decision-making process. The method can be used for complex distribution networks with different arrangement and legal base.

  8. A planning approach for agricultural watersheds using precision conservation

    USDA-ARS?s Scientific Manuscript database

    This brief article, written for a non-technical audience, discusses a recently-developed approach for watershed planning and nutrient reduction. The approach can help local stakeholders identify conservation practices that are locally preferred and determine how those practices can be distributed ac...

  9. Planning a Whole-School Approach to STEM

    ERIC Educational Resources Information Center

    Knowles, Becca

    2014-01-01

    An interdisciplinary approach to STEM has huge benefits in terms of engaging young people and increasing their awareness of the opportunities that STEM skills can provide. However, planning a whole-school approach to STEM education can be challenging. This article gives case studies of two recent projects in STEM education and introduces two…

  10. Planning a Whole-School Approach to STEM

    ERIC Educational Resources Information Center

    Knowles, Becca

    2014-01-01

    An interdisciplinary approach to STEM has huge benefits in terms of engaging young people and increasing their awareness of the opportunities that STEM skills can provide. However, planning a whole-school approach to STEM education can be challenging. This article gives case studies of two recent projects in STEM education and introduces two…

  11. Professional Development Planning: A Self-Directed Approach.

    ERIC Educational Resources Information Center

    Lamble, Wayne

    1983-01-01

    Presents an overview of a self-directed approach to professional development. Describes the major components as self-assessment of professional strengths and learning needs, planning, and organizing activities and records for professional development. Gives reasons for, benefits from, and requirements of a self-directed approach. (Availability:…

  12. An integrated mission planning approach for the space exploration initiative

    SciTech Connect

    Coomes, E.P.; Dagle, J.E.; Bamberger, J.A.; Noffsinger, K.E.

    1992-01-01

    A fully integrated energy-based approach to mission planning is needed if the Space Exploration Initiative (SEI) is to succeed. Such an approach would reduce the number of new systems and technologies requiring development. The resultant horizontal commonality of systems and hardware would reduce the direct economic impact of SEI and provide an economic benefit by greatly enhancing our international technical competitiveness through technology spin-offs and through the resulting early return on investment. Integrated planning and close interagency cooperation must occur if the SEI is to achieve its goal of expanding the human presence into the solar system and be an affordable endeavor. An energy-based mission planning approach gives each mission planner the needed power, yet preserves the individuality of mission requirements and objectives while reducing the concessions mission planners must make. This approach may even expand the mission options available and enhance mission activities.

  13. An integrated mission planning approach for the Space Exploration Initiative

    SciTech Connect

    Coomes, E.P.; Dagle, J.E.; Bamberger, J.A.; Noffsinger, K.E.

    1992-08-01

    This report discusses a fully integrated energy-based approach to mission planning which is needed if the Space Exploration Initiative (SEI) is to succeed. Such an approach would reduce the number of new systems and technologies requiring development. The resultant horizontal commonality of systems and hardware would reduce the direct economic impact of SEI and provide an economic benefit by greatly enhancing our international technical competitiveness through technology spin-offs and through the resulting early return on investment. Integrated planning and close interagency cooperation must occur if the SEI is to achieve its goal of expanding the human presence into the solar system and be an affordable endeavor. An energy-based mission planning approach gives each mission planner the needed power, yet preserves the individuality of mission requirements and objectives while reducing the concessions mission planners must make. This approach may even expand the mission options available and enhance mission activities.

  14. An integrated mission planning approach for the Space Exploration initiative

    NASA Astrophysics Data System (ADS)

    Coomes, E. P.; Dagle, J. E.; Bamberger, J. A.; Noffsinger, K. E.

    1992-08-01

    This report discusses a fully integrated energy-based approach to mission planning which is needed if the Space Exploration Initiative (SEI) is to succeed. Such an approach would reduce the number of new systems and technologies requiring development. The resultant horizontal commonality of systems and hardware would reduce the direct economic impact of SEI and provide an economic benefit by greatly enhancing our international technical competitiveness through technology spin-offs and through the resulting early return on investment. Integrated planning and close interagency cooperation must occur if the SEI is to achieve its goal of expanding the human presence into the solar system and be an affordable endeavor. An energy-based mission planning approach gives each mission planner the needed power, yet preserves the individuality of mission requirements and objectives while reducing the concessions mission planners must make. This approach may even expand the mission options available and enhance mission activities.

  15. Planning-Programming-Budgeting System. Intermediate Unit Planning Study. Final Report.

    ERIC Educational Resources Information Center

    Montgomery County School Board, Norristown, PA.

    In 1965-66 most local school districts in Pennsylvania completed reorganization by consolidating 67 county school offices into 25 or 30 intermediate administrative units. This document presents the results of various task group activities and projected activities to develop a "generalized" educational planning, programing, budgeting…

  16. Graduate Curriculum Development for Social Planning Specialization in Urban and Regional Planning. Final Report.

    ERIC Educational Resources Information Center

    McClure, Edward E.; Graetz, Robert E.

    A model curriculum in social planning at the graduate level has been developed and tested as an area of study at Florida State University (FSU). The project, which lasted from early 1967 through the summer of 1968, involved (1) a workshop to review the educational needs that should be met by the proposed curriculum, (2) a second workshop that…

  17. The role of immediate and final goals in action planning: an fMRI study.

    PubMed

    Majdandzić, Jasminka; Grol, Meike J; van Schie, Hein T; Verhagen, Lennart; Toni, Ivan; Bekkering, Harold

    2007-08-15

    To interact effectively with our environment, we need to specify the intended outcomes (goals) of our actions. In this process, immediate goals and final goals can be regarded as different levels within a hierarchically organized system for action planning: immediate goals and movement details are selected to accomplish more remote goals. Behavioral studies support this notion of different levels of action planning, but the neurophysiological basis remains unclear. Using fMRI, we examined the neural correlates of preparing object manipulations based on either the desired end-state (the final goal) or the initial movement towards a target (the immediate goal). Subjects had to insert an object (consisting of a large and a small cube) into one of two corresponding large and small slots. The subjects were cued on either which slot to fill (Final Goal trials) or which object part to grasp (Immediate Goal trials). These actions required similar movements, but different planning. During Final Goal trials, there was differential preparatory activity along the superior frontal gyrus (bilaterally) and in left inferior parietal cortex. Immediate Goal trials evoked differential activity in occipito-parietal and occipito-temporal cortex. These findings support the notion that actions can be planned at different levels. We show that different fronto-parietal circuits plan the same action, by a relative emphasis on either selecting a sequence of movements to achieve a desired end-state, or selecting movements spatially compatible with given object properties.

  18. Approach trajectory planning system for maximum concealment

    NASA Technical Reports Server (NTRS)

    Warner, David N., Jr.

    1986-01-01

    A computer-simulation study was undertaken to investigate a maximum concealment guidance technique (pop-up maneuver), which military aircraft may use to capture a glide path from masked, low-altitude flight typical of terrain following/terrain avoidance flight enroute. The guidance system applied to this problem is the Fuel Conservative Guidance System. Previous studies using this system have concentrated on the saving of fuel in basically conventional land and ship-based operations. Because this system is based on energy-management concepts, it also has direct application to the pop-up approach which exploits aircraft performance. Although the algorithm was initially designed to reduce fuel consumption, the commanded deceleration is at its upper limit during the pop-up and, therefore, is a good approximation of a minimum-time solution. Using the model of a powered-lift aircraft, the results of the study demonstrated that guidance commands generated by the system are well within the capability of an automatic flight-control system. Results for several initial approach conditions are presented.

  19. An innovative approach to capability-based emergency operations planning.

    PubMed

    Keim, Mark E

    2013-01-01

    This paper describes the innovative use information technology for assisting disaster planners with an easily-accessible method for writing and improving evidence-based emergency operations plans. This process is used to identify all key objectives of the emergency response according to capabilities of the institution, community or society. The approach then uses a standardized, objective-based format, along with a consensus-based method for drafting capability-based operational-level plans. This information is then integrated within a relational database to allow for ease of access and enhanced functionality to search, sort and filter and emergency operations plan according to user need and technological capacity. This integrated approach is offered as an effective option for integrating best practices of planning with the efficiency, scalability and flexibility of modern information and communication technology.

  20. An innovative approach to capability-based emergency operations planning

    PubMed Central

    Keim, Mark E

    2013-01-01

    This paper describes the innovative use information technology for assisting disaster planners with an easily-accessible method for writing and improving evidence-based emergency operations plans. This process is used to identify all key objectives of the emergency response according to capabilities of the institution, community or society. The approach then uses a standardized, objective-based format, along with a consensus-based method for drafting capability-based operational-level plans. This information is then integrated within a relational database to allow for ease of access and enhanced functionality to search, sort and filter and emergency operations plan according to user need and technological capacity. This integrated approach is offered as an effective option for integrating best practices of planning with the efficiency, scalability and flexibility of modern information and communication technology. PMID:28228987

  1. Innovative approaches to inertial confinement fusion reactors: Final report

    SciTech Connect

    Bourque, R.F.; Schultz, K.R.

    1986-11-01

    Three areas of innovative approaches to inertial confinement fusion (ICF) reactor design are given. First, issues pertaining to the Cascade reactor concept are discussed. Then, several innovative concepts are presented which attempt to directly recover the blast energy from a fusion target. Finally, the Turbostar concept for direct recovery of that energy is evaluated. The Cascade issues discussed are combustion of the carbon granules in the event of air ingress, the use of alternate granule materials, and the effect of changes in carbon flow on details of the heat exchanger. Carbon combustion turns out to be a minor problem. Four ICF innovative concepts were considered: a turbine with ablating surfaces, a liquid piston system, a wave generator, and a resonating pump. In the final analysis, none show any real promise. The Turbostar concept of direct recovery is a very interesting idea and appeared technically viable. However, it shows no efficiency gain or any decrease in capital cost compared to reactors with conventional thermal conversion systems. Attempts to improve it by placing a close-in lithium sphere around the target to increase gas generation increased efficiency only slightly. It is concluded that these direct conversion techniques require thermalization of the x-ray and debris energy, and are Carnot limited. They therefore offer no advantage over existing and proposed methods of thermal energy conversion or direct electrical conversion.

  2. Queuing network approach for building evacuation planning

    NASA Astrophysics Data System (ADS)

    Ishak, Nurhanis; Khalid, Ruzelan; Baten, Md. Azizul; Nawawi, Mohd. Kamal Mohd.

    2014-12-01

    The complex behavior of pedestrians in a limited space layout can explicitly be modeled using an M/G/C/C state dependent queuing network. This paper implements the approach to study pedestrian flows through various corridors in a topological network. The best arrival rates and their impacts to the corridors' performances in terms of the throughput, blocking probability, expected number of occupants in the system and expected travel time were first measured using the M/G/C/C analytical model. These best arrival rates were then fed to its Network Flow Programming model to find the best arrival rates to source corridors and routes optimizing the network's total throughput. The analytical results were then validated using a simulation model. Various results of this study can be used to support the current Standard Operating Procedures (SOP) to efficiently and safely evacuate people in emergency cases.

  3. Interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Interim final rules with request for comments.

    PubMed

    2010-06-17

    This document contains interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan.

  4. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    PubMed

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  5. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  6. Incentives for nondiscriminatory wellness programs in group health plans. Final rule.

    PubMed

    2013-06-03

    This document contains final regulations, consistent with the Affordable Care Act, regarding nondiscriminatory wellness programs in group health coverage. Specifically, these final regulations increase the maximum permissible reward under a health-contingent wellness program offered in connection with a group health plan (and any related health insurance coverage) from 20 percent to 30 percent of the cost of coverage. The final regulations further increase the maximum permissible reward to 50 percent for wellness programs designed to prevent or reduce tobacco use. These regulations also include other clarifications regarding the reasonable design of health-contingent wellness programs and the reasonable alternatives they must offer in order to avoid prohibited discrimination.

  7. 76 FR 81962 - Final Environmental Impact Statement for General Management Plan, Ross Lake National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... of Ross Lake NRA, Goodell Creek, and Newhalem Creek. Climate change impacts and Ross Lake NRA's... evaluating the changes and impacts of the other three alternatives. The emphasis of the No Action Alternative... NATIONAL PARK SERVICE Final Environmental Impact Statement for General Management Plan, Ross Lake...

  8. EPA Finalizes Changes to Cleanup Plan at Olean Well Field Site - AVX Property in Olean, NY

    EPA Pesticide Factsheets

    (New York, N.Y.) The U.S. Environmental Protection Agency has finalized its changes to a cleanup plan originally issued in 1996 to address soil and groundwater at the AVX property at the Olean Well Field Superfund Site in Cattaraugus County, Olean, NY. Soi

  9. 75 FR 47826 - Final General Management Plan/Environmental Impact Statement, Cumberland Gap National Historical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... potential environmental consequences of implementing the preferred alternative. Impact topics include the... National Park Service Final General Management Plan/Environmental Impact Statement, Cumberland Gap National.... ACTION: Notice of Availability. SUMMARY: Pursuant to 42 U.S.C. 4332(2)(C) of the National...

  10. 76 FR 71598 - Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... Fish and Wildlife Service Pearl Harbor National Wildlife Refuge, Honolulu County, HI; Final... http://www.fws.gov/pacific/planning/main/docs/HI-PI/docsjcpearl.htm . Email: Laura_Beauregard@fws.gov... Kamehameha Highway, Room 2C, Hale`iwa, HI 96712. FOR FURTHER INFORMATION CONTACT: David Ellis, Project Leader...

  11. Essential Communication and Documentation Skills. Module: Final Assessment and Action Planning.

    ERIC Educational Resources Information Center

    Medina, Muriel; And Others

    This module is the 10th of 10 in the Essential Communication and Documentation Skills curriculum. It develops final assessment and action planning, workplace literacy skills identified as being directly related to the job of the direct care worker. The curriculum is designed to improve the competence of New York State Division for Youth direct…

  12. Ten Year Plan for the Redevelopment of Intellectual Disability Services. Final Report, August, 1988. Data Book.

    ERIC Educational Resources Information Center

    Neilson Associates Pty. Ltd., Melbourne (Australia).

    This databook for the final report of the 10-year plan to redevelop services for individuals with intellectual disabilities in Victoria, Australia, presents results of three studies. The major study provides a functional profile of people with intellectual disabilities living in State-run institutions (Residential Training Centres) or attending…

  13. 75 FR 37790 - Lauryl Sulfate Salts; Antimicrobial Registration Review Final Work Plan and Proposed Registration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... AGENCY Lauryl Sulfate Salts; Antimicrobial Registration Review Final Work Plan and Proposed Registration... decision for the pesticide lauryl sulfate salts, case number 4061 and opens a public comment period on the... availability of EPA's proposed registration review decision for the pesticide lauryl sulfate salts, case...

  14. 77 FR 23741 - DEEPWATER HORIZON Oil Spill; Final Phase I Early Restoration Plan and Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... HORIZON oil spill. The Framework Agreement provides a mechanism through which the Trustees and BP can work... Fish and Wildlife Service DEEPWATER HORIZON Oil Spill; Final Phase I Early Restoration Plan and... DEEPWATER HORIZON Oil Spill (Framework Agreement), notice is hereby given that ] the Federal and State...

  15. 78 FR 8184 - DEEPWATER HORIZON Oil Spill; Final Phase II Early Restoration Plan and Environmental Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... DEEPWATER HORIZON Oil Spill; Final Phase II Early Restoration Plan and Environmental Review AGENCY: Interior... Addressing Injuries Resulting from the DEEPWATER HORIZON Oil Spill (Framework Agreement), notice is hereby... services injured or lost as a result of the DEEPWATER HORIZON oil spill, which occurred on or about April...

  16. 75 FR 25288 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Environmental Impact Statement for the Pocatello Field Office, Idaho AGENCY: Bureau of Land Management, Interior... Management (BLM) has prepared a Proposed Resource Management Plan/Final Environmental Impact Statement... clarify proposed management direction and update the analysis of potential environmental impacts, but...

  17. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Monocacy National Battlefield

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... local leased space. An alternative transportation system would be implemented. New trails would be...: 2010-11819] DEPARTMENT OF THE INTERIOR National Park Service Final Environmental Impact Statement for the General Management Plan; Monocacy National Battlefield AGENCY: National Park Service, Department...

  18. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Counties in northern New Mexico. This land use plan would replace the 1988 Taos RMP, as amended, and... Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior... Impact Statement (Proposed RMP/Final EIS) for the Taos Field Office, New Mexico, and by this Notice...

  19. EPA Finalizes Plan to Address Pollution at San German, Puerto Rico Toxic Site

    EPA Pesticide Factsheets

    (New York, N.Y.) The U.S. Environmental Protection Agency has finalized a plan to address contaminated soil and groundwater at the San German Groundwater Contamination Superfund Site in San German, Puerto Rico. The site includes the Retiro Industrial Park,

  20. EPA Revises Final Cleanup Plan for Ringwood Mines Superfund Site in Ringwood, New Jersey

    EPA Pesticide Factsheets

    (New York, N.Y.) The U.S. Environmental Protection Agency has determined that the Borough of Ringwood has satisfied the criteria specified in EPA's June 30, 2014 final cleanup plan for the Ringwood Mines Superfund site that allows for a recycling center to

  1. EPA Finalizes Cleanup Plan for Pesticides Storage Facility in Manati, P.R.

    EPA Pesticide Factsheets

    (New York, N.Y.) The U.S. Environmental Protection Agency has finalized a plan to address contaminated soil at a 2-acre former pesticide facility located in the municipality of Manatí, Puerto Rico. The Pesticide Warehouse III Superfund Site has soil and

  2. 78 FR 38072 - General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces the availability of a Final Environmental Impact Statement for the General Management Plan, Guadalupe Mountains National Park, Texas. DATES: The NPS will execute a Record of Decision no sooner than 30 days following...

  3. 76 FR 38146 - Revision to the Final Principles of Integrated Resource Planning for Use in Resource Acquisition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... Western Area Power Administration Revision to the Final Principles of Integrated Resource Planning for Use in Resource Acquisition and Transmission Planning AGENCY: Western Area Power Administration, DOE. ACTION: Notice; request for comment. SUMMARY: Western Area Power Administration (Western) published...

  4. Guidance document for preparing water sampling and analysis plans for UMTRA sites. Final [report

    SciTech Connect

    Not Available

    1993-09-01

    A water sampling and analysis plan (WSAP) is required for each Uranium Mill Tailings Remedial Action (UMTRA) site to provide rationale for groundwater and surface water sampling at disposal sites and former processing sites. The WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the groundwater and surface water monitoring stations at each site. Section 2.0 of this WSAP Guidance Document describes the WSAP format. Sections 3.0 and 4.0 provide guidance for selecting sampling frequencies and sampling locations, respectively. Section 5.0 contains criteria for selecting analytical parameters. Section 6.0 provides guidance for the contents of each site`s WSAP file. Finally, Section 7.0 presents the references used to prepare this document. The purpose of this guidance document is to provide a consistent technical approach for sampling and monitoring activities performed under WSAPs and a consistent format for WSAP documents. This document is designed for use by the Technical Assistance Contractor (TAC) to prepare WSAPs and by the US Department of Energy (DOE), Nuclear Regulatory Commission, state and tribal agencies, regulatory agencies, and the public to evaluate the contents of the WSAPS. This guidance document may be updated periodically based on new or changing regulations.

  5. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  6. EPA Issues Final Cleanup Plan for the Housatonic River Rest of River Project in Western Mass. and Conn.

    EPA Pesticide Factsheets

    Today, the U.S. Environmental Protection Agency issued its final decision on its Rest of River permit, which outlines a final cleanup plan for a 125 mile stretch of the Housatonic River from Pittsfield, Mass. through Connecticut.

  7. Population, human resources and development planning: towards an integrated approach.

    PubMed

    Farooq, G M

    1981-01-01

    An attempt is made in this discussion to outline in broad terms an analytical and operational framework for integrating population and human resources related issues. 3 sections provide a rationale for comprehensive population, human resources, and development planning; contain a brief description of the kind of policy research needed as part of the analytical base for comprehensive planning; and describe proposed institutional arrangements under which the national effort could be organized and coordinated and the related programs implemented. For comprehensive development planning, it is essential to consider population problems in their broad perspective. Population problems are related to the prevailing levels of mortality, health and nutrition, population movements, levels of unemployment, underemployment and child labor, women's roles, income inequalities, incidence of poverty, and quality of environment and the like, as well as, population growth. A model for the integration of population variables into national socioeconomic planning would involve, in increasing order of complexity, the following types of analytical work: detailed demographic estimates and projections; translation of the consequences of population dynamics into estimates of social and economic needs for the purpose of sectoral planning; and research on the more important demographic, social, and economic linkages in order to contribute to the formulation of population policies and related measures for influencing population variables directly and the overall development plan, sectoral plans, and individual programs and projects. Some of the more basic studies that would help to establish an appropriate analytical base for a comprehensive planning approach are outlined. A suitable operational framework is required for an effective and integrated approach to population, human resources, and development planning. What is necessary is the establishment of a permanent high level institution

  8. Final consolidated action plan to Tiger Team. Volume 2, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  9. Final consolidated action plan to Tiger Team. Volume 1, Change 1

    SciTech Connect

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.

  10. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    ERIC Educational Resources Information Center

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  11. Personal Development Plans: Insights from a Case Based Approach

    ERIC Educational Resources Information Center

    Greenan, Peter

    2016-01-01

    Purpose: In light of contemporary shifts away from annual appraisals, this study aims to explore the implications of using a personal development plan (PDP) as a means of focussing on continuous feedback and development to improve individual performance and ultimately organisational performance. Design/methodology/approach: Data were collected…

  12. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    ERIC Educational Resources Information Center

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  13. Personal Development Plans: Insights from a Case Based Approach

    ERIC Educational Resources Information Center

    Greenan, Peter

    2016-01-01

    Purpose: In light of contemporary shifts away from annual appraisals, this study aims to explore the implications of using a personal development plan (PDP) as a means of focussing on continuous feedback and development to improve individual performance and ultimately organisational performance. Design/methodology/approach: Data were collected…

  14. Planning in Reverse: A Viable Approach to Organizational Leadership

    ERIC Educational Resources Information Center

    Ballantyne, Scott; Berret, Beth; Wells, Mary Ellen

    2011-01-01

    Planning in Reverse is an innovative concept designed to make organizations more successful by altering the perspective utilized in the strategy process. What is needed for organizations to thrive in this new environment of change and uncertainty is a short-term approach for long-term viability. In this book, tools and concepts regarding Planning…

  15. 76 FR 66286 - Notice of Final 2010 Effluent Guidelines Program Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ...This notice presents the final 2010 Effluent Guidelines Program Plan(``final 2010 Plan''), which, as required under the Clean Water Act (CWA), identifies any new or existing industrial dischargers, both those discharging directly to surface waters and those discharging to publicly owned treatment works (POTWs), selected for effluent guidelines rulemaking and provides a schedule for such rulemakings. CWA section 304(m) requires EPA to biennially publish such a plan after public notice and comment. The Agency published the preliminary 2010 Plan on December 28, 2009 (74 FR 68599) and solicited comments from the public for 60 days. After considering rulemakings already in development, the 2010 reviews, the preliminary Plan and public comments and input to determine what, if any, new rulemakings should be initiated, EPA has decided to develop effluent guidelines and standards for the discharge of wastewater from the Coalbed Methane Extraction (CBM) industry and will develop pretreatments requirements for discharges of mercury from the Dental industry, and for the discharges of wastewater from the Shale Gas Extraction (SGE) industry. EPA is also issuing the detailed study report for the Coalbed Methane Extraction and the preliminary study report of the Ore Mining and Dressing industry. This notice also solicits public comments on EPA's 2011 reviews pursuant to the authority of CWA sections 304(b), 304(g), 301(d) and 307(b).

  16. Final Action Plan to Tiger Team. Environmental, safety and health assessment

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  17. The development of the Final Approach Spacing Tool (FAST): A cooperative controller-engineer design approach

    NASA Technical Reports Server (NTRS)

    Lee, Katharine K.; Davis, Thomas J.

    1995-01-01

    Historically, the development of advanced automation for air traffic control in the United States has excluded the input of the air traffic controller until the need of the development process. In contrast, the development of the Final Approach Spacing Tool (FAST), for the terminal area controller, has incorporated the end-user in early, iterative testing. This paper describes a cooperative between the controller and the developer to create a tool which incorporates the complexity of the air traffic controller's job. This approach to software development has enhanced the usability of FAST and has helped smooth the introduction of FAST into the operational environment.

  18. Security and privacy preserving approaches in the eHealth clouds with disaster recovery plan.

    PubMed

    Sahi, Aqeel; Lai, David; Li, Yan

    2016-11-01

    Cloud computing was introduced as an alternative storage and computing model in the health sector as well as other sectors to handle large amounts of data. Many healthcare companies have moved their electronic data to the cloud in order to reduce in-house storage, IT development and maintenance costs. However, storing the healthcare records in a third-party server may cause serious storage, security and privacy issues. Therefore, many approaches have been proposed to preserve security as well as privacy in cloud computing projects. Cryptographic-based approaches were presented as one of the best ways to ensure the security and privacy of healthcare data in the cloud. Nevertheless, the cryptographic-based approaches which are used to transfer health records safely remain vulnerable regarding security, privacy, or the lack of any disaster recovery strategy. In this paper, we review the related work on security and privacy preserving as well as disaster recovery in the eHealth cloud domain. Then we propose two approaches, the Security-Preserving approach and the Privacy-Preserving approach, and a disaster recovery plan. The Security-Preserving approach is a robust means of ensuring the security and integrity of Electronic Health Records, and the Privacy-Preserving approach is an efficient authentication approach which protects the privacy of Personal Health Records. Finally, we discuss how the integrated approaches and the disaster recovery plan can ensure the reliability and security of cloud projects.

  19. Interim final rules prohibiting discrimination based on genetic information in health insurance coverage and group health plans. Interim final rules with request for comments.

    PubMed

    2009-10-07

    This document contains interim final rules implementing sections 101 through 103 of the Genetic Information Nondiscrimination Act of 2008. These provisions prohibit discrimination based on genetic information in health insurance coverage and group health plans.

  20. Innovative design approaches for large wind turbine blades : final report.

    SciTech Connect

    Not Available

    2004-05-01

    The goal of the Blade System Design Study (BSDS) was investigation and evaluation of design and manufacturing issues for wind turbine blades in the one to ten megawatt size range. A series of analysis tasks were completed in support of the design effort. We began with a parametric scaling study to assess blade structure using current technology. This was followed by an economic study of the cost to manufacture, transport and install large blades. Subsequently we identified several innovative design approaches that showed potential for overcoming fundamental physical and manufacturing constraints. The final stage of the project was used to develop several preliminary 50m blade designs. The key design impacts identified in this study are: (1) blade cross-sections, (2) alternative materials, (3) IEC design class, and (4) root attachment. The results show that thick blade cross-sections can provide a large reduction in blade weight, while maintaining high aerodynamic performance. Increasing blade thickness for inboard sections is a key method for improving structural efficiency and reducing blade weight. Carbon/glass hybrid blades were found to provide good improvements in blade weight, stiffness, and deflection when used in the main structural elements of the blade. The addition of carbon resulted in modest cost increases and provided significant benefits, particularly with respect to deflection. The change in design loads between IEC classes is quite significant. Optimized blades should be designed for each IEC design class. A significant portion of blade weight is related to the root buildup and metal hardware for typical root attachment designs. The results show that increasing the number of blade fasteners has a positive effect on total weight, because it reduces the required root laminate thickness.

  1. 77 FR 23747 - Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... Bureau of Land Management Notice of Availability of the Proposed John Day Basin Resource Management Plan... Proposed Resource Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the John Day Basin... Register. ADDRESSES: Copies of the John Day Basin Proposed RMP/Final EIS have been sent to affected Federal...

  2. Helping Traditional Teachers To Plan and Implement Student Centered Classrooms; Selected Classroom Project. Final Report.

    ERIC Educational Resources Information Center

    Johnson, Gerald F. J.; Page, William C.

    The Selected Classroom Project was planned, implemented, evaluated, and disseminated between October 1970 and June 1971. It narrowed the focus of Project COD to helping teachers in specific classroom develop a practical approach to the transition from traditional to "open" classrooms. The 21 participating teachers in grades 4 through 8…

  3. Final proposed plan, Army Materials Technology Laboratory, task order 1, remedial investigation/feasibility study

    SciTech Connect

    1996-04-01

    The U.S. Army is proposing a cleanup plan, referred to as a preferred alternative, to address outdoor contamination at the MTL Superfund site in Watertown, Massachusetts. The Proposed Plan recommends one of the cleanup options from among those that were evaluated during the Remedial Investigation (RI) and Feasibility Study (FS) performed for the site. The Army is publishing this Proposed Plan to provide opportunity for public review and comment on the cleanup alternatives, known as remedial alternatives, under consideration for the site. The Army is soliciting comments on the proposed level of cleanup and will consider public comments as part of the final decision-making process for selecting the cleanup remedy for the site.

  4. 78 FR 24232 - Record of Decision for the Denali Park Road Final Vehicle Management Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Decision (ROD) for the Vehicle Management Plan and Environmental Impact Statement for Denali National Park... of the park's General Management Plan (GMP). The NPS will propose a modification to the current park... National Park Service Record of Decision for the Denali Park Road Final Vehicle Management Plan and...

  5. Developing and Testing Simulated Occupational Experiences for Distributive Education Students in Rural Communities: Volume III: Training Plans: Final Report.

    ERIC Educational Resources Information Center

    Virginia Polytechnic Inst. and State Univ., Blacksburg.

    Volume 3 of a three volume final report presents prototype job training plans developed as part of a research project which pilot tested a distributive education program for rural schools utilizing a retail store simulation plan. The plans are for 15 entry-level and 15 career-level jobs in seven categories of distributive business (department…

  6. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan Under... and Insurance Oversight, Department of Health and Human Services. ACTION: Amendment to interim final... regulations implementing the rules for group health plans and health insurance coverage in the group...

  7. A neural network approach to complete coverage path planning.

    PubMed

    Yang, Simon X; Luo, Chaomin

    2004-02-01

    Complete coverage path planning requires the robot path to cover every part of the workspace, which is an essential issue in cleaning robots and many other robotic applications such as vacuum robots, painter robots, land mine detectors, lawn mowers, automated harvesters, and window cleaners. In this paper, a novel neural network approach is proposed for complete coverage path planning with obstacle avoidance of cleaning robots in nonstationary environments. The dynamics of each neuron in the topologically organized neural network is characterized by a shunting equation derived from Hodgkin and Huxley's (1952) membrane equation. There are only local lateral connections among neurons. The robot path is autonomously generated from the dynamic activity landscape of the neural network and the previous robot location. The proposed model algorithm is computationally simple. Simulation results show that the proposed model is capable of planning collision-free complete coverage robot paths.

  8. A Planning Approach of Engineering Characteristics Based on QFD-TRIZ Integrated

    NASA Astrophysics Data System (ADS)

    Liu, Shang; Shi, Dongyan; Zhang, Ying

    Traditional QFD planning method compromises contradictions between engineering characteristics to achieve higher customer satisfaction. However, this compromise trade-off can not eliminate the contradictions existing among the engineering characteristics which limited the overall customer satisfaction. QFD (Quality function deployment) integrated with TRIZ (the Russian acronym of the Theory of Inventive Problem Solving) becomes hot research recently for TRIZ can be used to solve contradictions between engineering characteristics which construct the roof of HOQ (House of quality). But, the traditional QFD planning approach is not suitable for QFD integrated with TRIZ for that TRIZ requires emphasizing the contradictions between engineering characteristics at problem definition stage instead of compromising trade-off. So, a new planning approach based on QFD / TRIZ integration is proposed in this paper, which based on the consideration of the correlation matrix of engineering characteristics and customer satisfaction on the basis of cost. The proposed approach suggests that TRIZ should be applied to solve contradictions at the first step, and the correlation matrix of engineering characteristics should be amended at the second step, and at next step IFR (ideal final result) must be validated, then planning execute. An example is used to illustrate the proposed approach. The application indicated that higher customer satisfaction can be met and the contradictions between the characteristic parameters are eliminated.

  9. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect

    D. Vandel

    2003-09-01

    This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

  10. The advanced neutron source safety approach and plans

    SciTech Connect

    Harrington, R.M. )

    1989-01-01

    The Advanced Neutron Source (ANS) is a user facility for all areas of neutron research proposed for construction at the Oak Ridge National Laboratory. The neutron source is planned to be a 350-MW research reactor. The reactor, currently in conceptual design, will belong to the United States Department of Energy (USDOE). The safety approach and planned elements of the safety program for the ANS are described. The safety approach is to incorporate USDOE requirements (which, by reference, include appropriate requirements from the United States Nuclear Regulatory Commission (USNRC) and other national and state regulatory agencies) into the design, and to utilize probabilistic risk assessment (PRA) techniques during design to achieve extremely low probability of severe core damage. The PRA has already begun and will continue throughout the design and construction of the reactor. Computer analyses will be conducted for a complete spectrum of accidental events, from anticipated events to very infrequent occurrences. 8 refs., 2 tabs.

  11. Applying electrical utility least-cost approach to transportation planning

    SciTech Connect

    McCoy, G.A.; Growdon, K.; Lagerberg, B.

    1994-09-01

    Members of the energy and environmental communities believe that parallels exist between electrical utility least-cost planning and transportation planning. In particular, the Washington State Energy Strategy Committee believes that an integrated and comprehensive transportation planning process should be developed to fairly evaluate the costs of both demand-side and supply-side transportation options, establish competition between different travel modes, and select the mix of options designed to meet system goals at the lowest cost to society. Comparisons between travel modes are also required under the Intermodal Surface Transportation Efficiency Act (ISTEA). ISTEA calls for the development of procedures to compare demand management against infrastructure investment solutions and requires the consideration of efficiency, socioeconomic and environmental factors in the evaluation process. Several of the techniques and approaches used in energy least-cost planning and utility peak demand management can be incorporated into a least-cost transportation planning methodology. The concepts of avoided plants, expressing avoidable costs in levelized nominal dollars to compare projects with different on-line dates and service lives, the supply curve, and the resource stack can be directly adapted from the energy sector.

  12. Final rules relating to use of electronic communication and recordkeeping technologies by employee pension and welfare benefit plans. Notice of final rulemaking.

    PubMed

    2002-04-09

    This document contains final rules under Title I of the Employee Retirement Income Security Act of 1974, as amended (ERISA), concerning the disclosure of certain employee benefit plan information through electronic media, and the maintenance and retention of employee benefit plan records in electronic form. The rules establish a safe harbor pursuant to which all pension and welfare benefit plans covered by Title I of ERISA may use electronic media to satisfy disclosure obligations under Title I of ERISA. The rules also provide standards concerning the use of electronic media in the maintenance and retention of records required by sections 107 and 209 of ERISA. The rules affect employee pension and welfare benefit plans, including group health plans, plan sponsors, administrators and fiduciaries, and plan participants and beneficiaries.

  13. Medicaid program; self-directed personal assistance services program State Plan option (cash and counseling). Final rule.

    PubMed

    2008-10-03

    This final rule provides guidance to States that want to administer self-directed personal assistance services through their State Plans, as authorized by the Deficit Reduction Act of 2005. The State plan option allows beneficiaries, through an approved self-directed services plan and budget, to purchase personal assistance services. The rule also provides guidance to ensure beneficiary health and welfare and financial accountability of the State Plan option.

  14. Meshing human resources planning with strategic business planning: a model approach.

    PubMed

    Baird, L; Meshoulam, I; DeGive, G

    1983-01-01

    Many people are touting the need to take a strategic approach to human resources management--but this is more easily said than done, point out authors Lloyd Baird, associate professor of management at the School of Management and the Human Resources Policy Institute at Boston University; Ilan Meshoulam, personnel executive at Digital Equipment Corporation; and Ghislaine DeGive, Boston University. Obviously, people cannot be moved around as easily or as speedily as can other resources to help move a company to a strategically identified future position. Thus a great deal of planning is required. The authors present an integrative human resources strategic planning model that focuses on four elements: the environment, the organization's culture, the corporate mission statement, and overall corporate strategy. Each part of the model is thoroughly discussed, and checklist questions are included to help the individual manager develop and implement human resources management plans for his or her own organization.

  15. 2013 Nutrition Risk Research Plan Review Final Report. Research Plan Review for: The Risk Factor of Inadequate Nutrition

    NASA Technical Reports Server (NTRS)

    2014-01-01

    The 2013 Nutrition Risk Standing Review Panel (from here on referred to as the SRP) was impressed by the degree of progress the nutrition discipline has made with the research plan presented since the 2012 Nutrition Risk SRP WebEx/teleconference. The scientists and staff associated with the nutrition discipline have, in addition, continued their impressive publication track record. Specifically the SRP found that the novel and important progress in the ocular health research area (Gap N7.3) represents an important advance in understanding the etiology and potential countermeasures for this condition and thinks that the work will not only be valuable for vision, but may have implications for cardiovascular health, as well. The SRP also considered the bone countermeasure data presented a potentially valuable tool for investigating bone metabolism under the unique conditions of space travel, specifically the innovation of variable use of stable Ca isotopes for bone synthesis and equal contribution for bone to investigate bone metabolism, as well as, the impact of the advanced resistive exercise device (ARED) on body composition during spaceflight. Finally, the SRP considers the planned Integrated Nutrition task to be an important and necessary strategic part of the research plan. The SRP is concerned that the risks observed in previous research on Low Earth Orbit (LEO) may not capture all the risks of longer duration flight beyond LEO. In particular, the SRP believes that there may be a much greater likelihood of an intensified chronic inflammatory response compared to the very minimal evidence seen to date and that modest effects seen in LEO, such as the reduction in appetite, may not predict an absence in longer duration flight out of LEO. The added complications of longer duration flight, greater bio-behavioral stress, radiation exposure, poorer communication, and inability to respond to unforeseen exigencies may create different risks. Thus, preparation for

  16. 40 CFR 62.15065 - How do I comply with the increment of progress for submittal of a final control plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... progress for submittal of a final control plan? 62.15065 Section 62.15065 Protection of Environment....15065 How do I comply with the increment of progress for submittal of a final control plan? For your final control plan increment of progress, you must complete two items: (a) Submit the final control...

  17. 40 CFR 62.15065 - How do I comply with the increment of progress for submittal of a final control plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... progress for submittal of a final control plan? 62.15065 Section 62.15065 Protection of Environment....15065 How do I comply with the increment of progress for submittal of a final control plan? For your final control plan increment of progress, you must complete two items: (a) Submit the final control...

  18. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  19. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  20. [Landscape planning approaches for biodiversity conservation in agriculture].

    PubMed

    Liu, Yun-hui; Li, Liang-tao; Yu, Zhen-rong

    2008-11-01

    Biodiversity conservation in agriculture not only relates to the sustainable development of agriculture, but also is an essential part of species conservation. In recent years, the landscape planning approach for biodiversity was highlighted instead of species-focused approach. In this paper, the landscape factors affecting the biodiversity in agriculture were reviewed, and the possible landscape approaches at three different scales for more efficient conservation of biodiversity in agro-landscape were suggested, including: (1) the increase of the proportion of natural or semi-natural habitats in agriculture, diversification of land use or crop pattern, and protection or construction of corridor at landscape level; (2) the establishment of non-cropping elements such as field margin at between-field level; and (3) the application of reasonable crop density, crop distribution pattern and rotation, and intercrop etc. at within-field level. It was suggested that the relevant policies for natural conservation, land use planning, and ecological compensation should be made to apply the landscape approaches for biodiversity conservation at larger scale.

  1. An Evaluation of the New Approach Method--Final Report.

    ERIC Educational Resources Information Center

    Powers, Donald E.

    The New Approach Method (NAM) is an innovative reading program relying heavily on a phonics approach. The mode of presentation is a cassette tape recorder, which the child is taught to operate at the beginning of the program. The NAM lessons were administered to children at four NAM mini centers; a group of parents administered the NAM lessons to…

  2. Phase 1 Final status survey plan for the West Valley demonstration project.

    SciTech Connect

    Johnson, R. L.

    2011-05-31

    This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to

  3. A Unified Approach to Model-Based Planning and Execution

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Dorais, Gregory A.; Fry, Chuck; Levinson, Richard; Plaunt, Christian; Norvig, Peter (Technical Monitor)

    2000-01-01

    Writing autonomous software is complex, requiring the coordination of functionally and technologically diverse software modules. System and mission engineers must rely on specialists familiar with the different software modules to translate requirements into application software. Also, each module often encodes the same requirement in different forms. The results are high costs and reduced reliability due to the difficulty of tracking discrepancies in these encodings. In this paper we describe a unified approach to planning and execution that we believe provides a unified representational and computational framework for an autonomous agent. We identify the four main components whose interplay provides the basis for the agent's autonomous behavior: the domain model, the plan database, the plan running module, and the planner modules. This representational and problem solving approach can be applied at all levels of the architecture of a complex agent, such as Remote Agent. In the rest of the paper we briefly describe the Remote Agent architecture. The new agent architecture proposed here aims at achieving the full Remote Agent functionality. We then give the fundamental ideas behind the new agent architecture and point out some implication of the structure of the architecture, mainly in the area of reactivity and interaction between reactive and deliberative decision making. We conclude with related work and current status.

  4. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    SciTech Connect

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  5. An alternative approach to solar system exploration planning

    NASA Astrophysics Data System (ADS)

    Herman, Daniel H.; Niehoff, John C.; Spadoni, Daniel J.

    Planning for the future exploration of the solar system has involved the structuring of a series of missions that address major scientific objectives at a minimum runout cost for the entire endeavor. In many cases, however, the optimal structuring of a program that would minimize the runout cost would entail an unacceptable high annual funding. Our actual planning must consider the planning wedge imposed on the National Aeronautics and Space Administration. It is vital that a plan be structured that copes with the annual restraint. If we do not recognize this, our plan will not be realized and a queing problem will result, thus negating all of our planning efforts. This paper presents ideas as to how planetary initiatives can be structured, wherein the peak annual funding is minimized. One vital aspect in the plan is to have a transportation capability that can launch a mission in any planetary opportunity. Solar electric propulsion can provide this capability. Another cost reduction approach would be to structure a mission set in a time sequenced fashion that could utilize essentially the same spacecraft for the implementation of several missions. This opportunity does exist. A third technique would be to fulfill a scientific objective in several sequential missions rather than attempt to accomplish all of the objectives with one mission. This approach might be applied to a mission currently in the planning stage designated the Saturn Orbiter Dual Probe mission. The current concept involves the delivery of a Saturn probe, a Titan probe, and a Saturn Orbiter by a one Shuttle launch. In this case, the orbiter must serve as a relay station for both probes; map the magnetosphere of Saturn; conduct a survey of Saturn's major satellites; and perform the planetological observation of Saturn itself. This mission entails the development of a complex spacecraft that would be required to have a fairly long life due to the extended mission operations at the benefit of

  6. Social marketing: an approach to planned social change.

    PubMed

    Kotler, P; Zaltman, G

    1971-07-01

    This article examines the applicability of marketing concepts to social causes and social change. Social marketing is defined as the design, implementation, and control of programs calculated to influence the acceptability of social ideas and involving considerations of product planning, pricing, communication, distribution and marketing research. Wiebe examined four social advertising campaigns and concluded that their effectiveness depended on the presence of adequate force, direction, adequate and compatible social mechanism, and distance (the "cost" of the new attitude as seen by message's message"s recepient). A marketing planning approach is not a guarantee for the achievement of social objectives; yet, it represents a bridging mechanism linking the knowledge of the behavioral scientist with the socially useful implementation of that knowledge.

  7. Social impact assessment: A review and proposed approach: Final report

    SciTech Connect

    Bradbury, J A

    1986-12-01

    The objective of the report is to identify the essential components of a comprehensive plan to assess the potential social impacts of the proposed construction and operation of a high level radioactive waste repository by the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The tasks taken to achieve this objective are: examination of the literature on Social Impact Assessment (SIA); identification of different conceptual frameworks that have been proposed or used in SIA; examination of specific aspects of the frameworks; assessment of strengths and weaknesses of the frameworks; synthesis of common elements in these frameworks; and examination and evaluation of methods of data collection and analysis. 150 refs., 6 figs., 7 tabs.

  8. Dispersive approaches for three-particle final state interaction

    DOE PAGES

    Guo, Peng; Danilkin, Igor V.; Szczepaniak, Adam P.

    2015-10-30

    In this work, we presented different representations of Khuri-Treiman equation, the advantage and disadvantage of each representations are discussed. With a scattering amplitude toy model, we also studied the sensitivity of solution of KT equation to left-hand cut of toy model and to the different approximate methods. At last, we give a brief discussion of Watson's theorem when three particles in final states are involved.

  9. Dispersive approaches for three-particle final state interaction

    SciTech Connect

    Guo, Peng; Danilkin, Igor V.; Szczepaniak, Adam P.

    2015-10-30

    In this work, we presented different representations of Khuri-Treiman equation, the advantage and disadvantage of each representations are discussed. With a scattering amplitude toy model, we also studied the sensitivity of solution of KT equation to left-hand cut of toy model and to the different approximate methods. At last, we give a brief discussion of Watson's theorem when three particles in final states are involved.

  10. EMP (electromagnetic pulse) mitigation program approach. Final report

    SciTech Connect

    Not Available

    1987-09-10

    The function of the EMP Mitigation Program is to assess, and where possible, lessen the potential adverse effects of electromagnetic pulse (EMP) on the nation's telecommunications infrastructure. The Office of the Manager, National Communications System (OMNCS) focuses its efforts on the Public Switched Network (PSN) because the majority of critical government users rely on the PSN to conduct their National Security Emergency Preparedness (NSEP) communication requirements. This document presents an overall plan for the EMP Mitigation Program. To date, the OMNCS has a series of tools for quantifying EMP effects on the PSN. These tools include models for predicting the effect of EMP on network equipment and estimating the EMP stress levels that equipment are exposed to. Also available is a data base for describing the topology of a major portion of the post-divestiture PSN. Results of these activities are then synthesized into a network level model, whose function is to evaluate the performance capabilities of the MEP exposed network. In addition the network-level model has the ability to perform sensitivity studies. Sensitivity studies can assess the importance of different equipment types, and they are therefore useful for identifying which equipment types are require EMP testing. Present plans call for testing of the Northern Telecom DMS-100 and ATandT 4ESS switches.

  11. Amendment to the interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Amendment to interim final rules with request for comments.

    PubMed

    2010-11-17

    This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  12. Single Event Effects (SEE) Testing: Practical Approach to Test Plans

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.; Pellish, Jonathan Allen; Berg, Melanie D.

    2014-01-01

    While standards and guidelines for performing SEE testing have existed for several decades, guidance for developing SEE test plans has not been as easy to find. In this presentation, the variety of areas that need to be considered ranging from resource issues (funds, personnel, schedule) to extremely technical challenges (particle interaction and circuit application), shall be discussed. Note: we consider the approach outlined here as a "living" document: Mission-specific constraints and new technology related issues always need to be taken into account.

  13. Dispersive approaches for three-particle final state interaction

    NASA Astrophysics Data System (ADS)

    Guo, Peng; Danilkin, I. V.; Szczepaniak, Adam P.

    2015-10-01

    In this work, we present different representations of the Khuri-Treiman equation and discuss advantages and disadvantages of each representation. In particular we focus on the inversion technique proposed by Pasquier, which, even though developed a long time ago, has not been used in modern analyses of data on three particle decays. We apply the method to a toy model and compare the sensitivity of this and alternative solution methods to the left-hand cut contribution. We also discuss the meaning and applicability of Watson's theorem when three particles in final states are involved.

  14. 77 FR 76515 - Notice of Availability of the National Petroleum Reserve-Alaska Final Integrated Activity Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ....DS0000] Notice of Availability of the National Petroleum Reserve-Alaska Final Integrated Activity Plan.... SUMMARY: The Bureau of Land Management (BLM), Alaska State Office, is issuing the National...

  15. A Home Learning Center Approach to Early Stimulation. Final Report.

    ERIC Educational Resources Information Center

    Gordon, Ira J.; Guinagh, Barry J.

    The Home Learning Center (HLC) Project, a combination of research and demonstration containing phases of basic research, material development and field testing of materials and delivery system, began in 1968 as a longitudinal investigation of a home-oriented approach to intervention in the lives of very young children which might enhance their…

  16. Regional power systems planning: a state of the art assessment. Final report

    SciTech Connect

    Not Available

    1980-10-01

    The purpose of this report was to define regional power systems planning problems, the tools available and their shortcomings, and to document all of the above in a concise readable form. The approach consisted of a survey and literature search. The survey determined the tools being used by utilities, the tools they had rejected, and the tools they planned to try out. The literature search was conducted for the purpose of documenting the tools available, and performing a comparative analysis of these tools. The project included a mix of utility, university, and consulting organizations. Several organizations were consulted in the selection of the participants. A non-profit organization, The University of Oklahoma, was selected to manage the project. The results were reviewed in a series of four one day meetings by known authorities in each field. This report consists of the results of this project. Perhaps its major finding is that several aspects of the regional planning problem are not well defined, the roles of the various participants in regional planning is not clear, and certainly research is needed for the development of new methodology.

  17. Robust Planning for Autonomous Navigation of Mobile Robots in Unstructured, Dynamic Environments: An LDRD Final Report

    SciTech Connect

    EISLER, G. RICHARD

    2002-08-01

    This report summarizes the analytical and experimental efforts for the Laboratory Directed Research and Development (LDRD) project entitled ''Robust Planning for Autonomous Navigation of Mobile Robots In Unstructured, Dynamic Environments (AutoNav)''. The project goal was to develop an algorithmic-driven, multi-spectral approach to point-to-point navigation characterized by: segmented on-board trajectory planning, self-contained operation without human support for mission duration, and the development of appropriate sensors and algorithms to navigate unattended. The project was partially successful in achieving gains in sensing, path planning, navigation, and guidance. One of three experimental platforms, the Minimalist Autonomous Testbed, used a repetitive sense-and-re-plan combination to demonstrate the majority of elements necessary for autonomous navigation. However, a critical goal for overall success in arbitrary terrain, that of developing a sensor that is able to distinguish true obstacles that need to be avoided as a function of vehicle scale, still needs substantial research to bring to fruition.

  18. Combined approach to the inverse protein folding problem. Final report

    SciTech Connect

    Ruben A. Abagyan

    2000-06-01

    The main scientific contribution of the project ''Combined approach to the inverse protein folding problem'' submitted in 1996 and funded by the Department of Energy in 1997 is the formulation and development of the idea of the multilink recognition method for identification of functional and structural homologues of newly discovered genes. This idea became very popular after they first announced it and used it in prediction of the threading targets for the CASP2 competition (Critical Assessment of Structure Prediction).

  19. 76 FR 76972 - Release of Final Integrated Review Plan for the National Ambient Air Quality Standards for Lead

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ... AGENCY Release of Final Integrated Review Plan for the National Ambient Air Quality Standards for Lead... the National Ambient Air Quality Standards for Lead. This document contains the plans for the review of the air quality criteria and national ambient air quality standards (NAAQS) for lead (Pb). The Pb...

  20. Patient Protection and Affordable Care Act; third party payment of qualified health plan premiums. Interim final rule with comment period.

    PubMed

    2014-03-19

    This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.

  1. 77 FR 24451 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan...' revised State Plan to control air pollutants from Hazardous/ Medical/Infectious Waste Incinerators...

  2. 77 FR 24451 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan... revised State Plan to control air pollutants from Hazardous/ Medical/Infectious Waste Incinerators...

  3. Selected approaches to determining the purpose of emergency planning zones

    NASA Astrophysics Data System (ADS)

    Dobeš, Pavel; Baudišová, Barbora; Sluka, Vilém; Skřínský, Jan; Danihelka, Pavel; Dlabka, Jakub; Řeháček, Jakub

    2013-04-01

    One of the major accident hazards (hereinafter referred to as "MAH") tools to determine the range of effects of a major accident and consequent protection of the public is the determination of the emergency planning zone (hereinafter referred to as "zone"). In the Czech Republic, the determination of the zone is regulated by the Decree No. 103/2006 Coll. laying down the principles for determination of the emergency planning zone and the extent and manner of elaborating the external emergency plan (hereinafter referred to as "Decree") 3. The Decree is based on the principles of the IAEA-TECDOC-727 method - Manual for the Classification and Prioritization of Risks Due to Major Accidents in Process and Related Industries (hereinafter referred to as "method" and "manual", respectively)3. In the manual, it is pointed out that the method used is not suitable for making emergency plans for special situations (industrial activities in an inhabited area). Nonetheless, its principles and procedures are still used for such purposes in the Czech Republic. The expert scientific community dealing with MAH issues in the Czech Republic, however, realizes that the procedure of the zone boundary delineation should be modified to reflect up-to-date knowledge in protection of the public and its enhancement. Therefore, the OPTIZON Project (Optimization of the Emergency Planning Zone Designation and Elaboration of Emergency Plans Based on Threatening Effects of Dangerous Chemical Substances at Operational Accidents with Respect to Inhabitant Protection Enhancement) was developed and approved for the Program of Security Research of the Czech Republic 2010 - 2015 (BV II/2-VS). One of the main project's objectives is to define clearly the purpose of the zone because at present it is not quite apparent. From the general view, this step may seem insignificant or trivial, but the reverse is true. It represents one of the most important stages in seeking the approach to the zone designation as

  4. The accuracy of virtual surgical planning in free fibula mandibular reconstruction: comparison of planned and final results.

    PubMed

    Roser, Steven M; Ramachandra, Srinivasa; Blair, Henry; Grist, William; Carlson, Grant W; Christensen, Andrew M; Weimer, Katherine A; Steed, Martin B

    2010-11-01

    The concept of virtual surgery uses surgical simulation rather than relying exclusively on intraoperative manual approximation of facial reconstruction. The purpose of this study was to evaluate the degree to which surgical outcomes in free fibula mandibular reconstructions planned with virtual surgery and carried out with prefabricated surgical plate templates and cutting guides correlated to the virtual surgical plan in a series of 11 patients. This retrospective study evaluated 11 consecutive patients (6 males and 5 females) with an average age of 50.73 years (range, 23-72 years) who required mandibular reconstruction for aggressive benign or malignant disease with a free fibula osseomyocutaneous flap at Emory University Hospital (Atlanta, GA) between January 1, 2009 and December 31, 2009. In each case, a high-resolution helical computed tomography (CT) scan of the maxillofacial region and mandible was obtained prior to surgery. The CT data was sent on a CD to a modeling company (Medical Modeling Inc, Golden, CO). The scans were then converted into 3-dimensional models of the maxillofacial skeleton utilizing both automatic and manual segmentation techniques in the SurgiCase CMF software (Materialise NV, Leuven, Belgium). A virtual surgery planning session was held via a Web meeting between the surgeons and the modeling company, at which the resection planes of the mandible, positioning of the plate, and fibula lengths/osteotomy angles were established. The surgery was then carried out using prefabricated cutting guides and manual bending of a reconstruction plate using a prefabricated plate template. A postoperative CT scan of each patient was obtained within the first 7 postoperative days on the same scanner. Three-dimensional computer models of the final reconstruction were obtained for comparison with the preoperative virtual plan. To make the desired comparisons, the 3-dimensional objects representing the postoperative surgical outcome were superimposed onto

  5. Demographics, strategic planning, and marketing: a low budget approach.

    PubMed

    Summers, J

    1990-01-01

    Health care organizations with constrained planning budgets can access data sources which will be of great assistance in strategic and market analysis. The data described in this article can be obtained for $250 or less. For segmenting the market even further, down to the International Classification of Disease (ICD)-9 Code Level, the National Center for Health Statistics of the Department of Health and Human Services publishes an annual data book which indicates the use rates for every ICD-9 Code. This extremely valuable data source is all less than $10. Managers can take inexpensive data from the Census and from HHS and proceed to determine major opportunities and challenges facing their institutions. The same data then serve as the basis for planning about how to meet those challenges or take advantage of those opportunities. Finally, the same data will allow product line management to proceed on the basis of quantitative goals that are established in terms of the actual facts of the local situation. The skills required to perform these analyses are not complex, but the task is time intense.

  6. Megavoltage conebeam CT cine as final verification of treatment plan in lung stereotactic body radiotherapy.

    PubMed

    Kudithipudi, Vijay; Gayou, Olivier; Colonias, Athanasios

    2016-06-01

    To analyse the clinical impact of megavoltage conebeam computed tomography (MV-CBCT) cine on internal target volume (ITV) coverage in lung stereotactic body radiotherapy (SBRT). One hundred and six patients received lung SBRT. All underwent 4D computed tomography simulation followed by treatment via image guided 3D conformal or intensity modulated radiation. Prior to SBRT, all patients underwent MV-CBCT cine, in which raw projections are displayed as beam's-eye-view fluoroscopic series with the planning target volume (PTV) projected onto each image, enabling verification of tumour motion relative to the PTV and assessment of adequacy of treatment margin. Megavoltage conebeam computed tomography cine was completed 1-2 days prior to SBRT. Four patients (3.8%) had insufficient ITV coverage inferiorly at cine review. All four plans were changed by adding 5 mm on the PTV margin inferiorly. The mean change in PTV volumes was 3.9 cubic centimetres (cc) (range 1.85-6.32 cc). Repeat cine was performed after plan modification to ensure adequate PTV coverage in the modified plans. PTV margin was adequate in the majority of patients with this technique. MV-CBCT cine did show insufficient coverage in a small subset of patients. Insufficient PTV margins may be a function of 4D CT simulation inadequacies or deficiencies in visualizing the ITV inferior border in the full-inhale phase. MV-CBCT cine is a valuable tool for final verification of PTV margins. © 2016 The Royal Australian and New Zealand College of Radiologists.

  7. New approaches for high-efficiency solar cells. Final report

    SciTech Connect

    Bedair, S M; El-Masry, N A

    1997-12-01

    This report summarizes the activities carried out in this subcontract. These activities cover, first the atomic layer epitaxy (ALE) growth of GaAs, AlGaAs and InGaP at fairly low growth temperatures. This was followed by using ALE to achieve high levels of doping both n-type and p-type required for tunnel junctions (Tj) in the cascade solar cell structures. Then the authors studied the properties of AlGaAs/InGaP and AlGaAs/GaAs tunnel junctions and their performances at different growth conditions. This is followed by the use of these tunnel junctions in stacked solar cell structures. The effect of these tunnel junctions on the performance of stacked solar cells was studied at different temperatures and different solar fluences. Finally, the authors studied the effect of different types of black surface fields (BSF), both p/n and n/p GaInP solar cell structures, and their potential for window layer applications. Parts of these activities were carried in close cooperation with Dr. Mike Timmons of the Research Triangle Institute.

  8. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan Section 13.6.2, Revision 1 on Physical Security--Design Certification AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Notice of Availability. SUMMARY: The NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review...

  9. A novel approach to modeling unstable EOR displacements. Final report

    SciTech Connect

    Peters, E.J.

    1994-04-01

    Most enhanced oil recovery schemes involve the displacement of a more dense and more viscous oil by a less dense and less viscous fluid in a heterogeneous porous medium. The interaction of heterogeneity with the several competing forces, namely, viscous, capillary, gravitational, and dispersive forces, can conspire to make the displacements unstable and difficult to model and to predict. The objective of this research was to develop a systematic methodology for modeling unstable fluid displacements in heterogeneous media. Flow visualization experiments were conducted using X-ray computed tomography imaging and a video imaging workstation to gain insights into the dynamics of unstable displacements, acquire detailed quantitative experimental image data for calibrating numerical models of unstable displacements, and image and characterize heterogeneities in laboratory cores geostatistically. High-resolution numerical models modified for use on vector-architecture supercomputers were used to replicate the image data. Geostatistical models of reservoir heterogeneity were incorporated in order to study the interaction of hydrodynamic instability and heterogeneity in reservoir displacements. Finally, a systematic methodology for matching the experimental data with the numerical models and scaling the laboratory results to other systems were developed. The result is a new method for predicting the performance of unstable EOR displacements in the field based on small-scale displacements in the laboratory. The methodology is general and can be applied to forecast the performance of most processes that involve fluid flow and transport in porous media. Therefore, this research should be of interest to those involved in forecasting the performance of enhanced oil recovery processes and the spreading of contaminants in heterogeneous aquifers.

  10. The School District Role in Introducing Microcomputers: A Contingency Planning Approach.

    ERIC Educational Resources Information Center

    Williams, Richard C.; And Others

    1984-01-01

    Briefly discusses no-plan approach and linear approach to school district computer involvement and suggests contingency planning approach is better. Components of this approach--conducting situation audit of internal and external environments, generating within-district support, formulating district-wide policies, and developing an ongoing…

  11. Toward a dynamic approach of THA planning based on ultrasound.

    PubMed

    Dardenne, Guillaume; Dusseau, Stéphane; Hamitouche, Chafiaâ; Lefèvre, Christian; Stindel, Eric

    2009-04-01

    The risk of dislocation after THA reportedly is minimized if the acetabular implant is oriented at 45 degrees inclination and 15 degrees anteversion with respect to the anterior pelvic plane. This reference plane now is used in computer-assisted protocols. However, this static approach may lead to postoperative instability because the dynamic variations of the pelvis influence effective cup orientation and are not taken into account in this approach. We propose an ultrasound tool to register the preoperative dynamics of the pelvis for THA planning during computer-assisted surgery. To assess this pelvic behavior and its consequences on implant orientation, we tested a new 2.5-dimensional ultrasound-based approach. The pelvic flexion was registered in sitting, standing, and supine positions in 20 subjects. The mean values were -25.2 degrees +/- 5.8 degrees (standard deviation), 2.4 degrees +/- 5.1 degrees , and 6.8 degrees +/- 3.5 degrees , respectively. The mean functional anteversion varied by 26 degrees and the mean functional inclination by 12 degrees depending on the pelvic flexion. We therefore recommend including dynamic pelvic behavior to minimize dislocation risk. The notion of a safe zone should be revisited and extended to include changes with activity.

  12. Toward a Dynamic Approach of THA Planning Based on Ultrasound

    PubMed Central

    Dusseau, Stéphane; Hamitouche, Chafiaâ; Lefèvre, Christian; Stindel, Eric

    2008-01-01

    The risk of dislocation after THA reportedly is minimized if the acetabular implant is oriented at 45° inclination and 15° anteversion with respect to the anterior pelvic plane. This reference plane now is used in computer-assisted protocols. However, this static approach may lead to postoperative instability because the dynamic variations of the pelvis influence effective cup orientation and are not taken into account in this approach. We propose an ultrasound tool to register the preoperative dynamics of the pelvis for THA planning during computer-assisted surgery. To assess this pelvic behavior and its consequences on implant orientation, we tested a new 2.5-dimensional ultrasound-based approach. The pelvic flexion was registered in sitting, standing, and supine positions in 20 subjects. The mean values were −25.2° ± 5.8° (standard deviation), 2.4° ± 5.1°, and 6.8° ± 3.5°, respectively. The mean functional anteversion varied by 26° and the mean functional inclination by 12° depending on the pelvic flexion. We therefore recommend including dynamic pelvic behavior to minimize dislocation risk. The notion of a safe zone should be revisited and extended to include changes with activity. PMID:18688691

  13. Green city Banda Aceh: city planning approach and environmental aspects

    NASA Astrophysics Data System (ADS)

    Arif, A. A.

    2017-02-01

    Banda Aceh as the capital of Aceh Province is the region with the tsunami disaster that occurred on December 26, 2004 the most severe of which over 60% of the city area were destroyed mainly coastal region and settlements. One product plan for rehabilitation and reconstruction of Banda Aceh is made of Banda Aceh as Green City. To realize the Green City Banda Aceh, urban development process should be conducted in a planned and integrated way with attention to spatial and environmental aspects to ensure an efficient urban management and to create a healthy, beautiful and comfortable environment. There is a weakness of the process in urban planning and development that occurred at present where cities tend to minimize the development of green open space and land conversion into a commercial district, residential areas, industrial areas, transport networks and infrastructure and facilities for other cities. Another tendency that occurs is urban environment only developed economically but not ecologically, whereas ecological balance is as important as the development of the economic value of urban areas. Such conditions have caused unbalance of urban ecosystems including increased air temperature, air pollution, declining water table, flooding, salt water intrusion and increased content of heavy metals in the soil. From an ecological perspective, unfavorable microclimate, high-temperature increase due to the lack of trees as a sieve / filter against heavy rain, can cause flooding. These conditions result in inconvienient, arid and less beautiful urban areas. The author identifies the elements contained in the Green City Banda Aceh and how the efforts and approaches must be made toward Green City Banda Aceh.

  14. The third stage of hospital long-range planning: the marketing approach.

    PubMed

    Rynne, T J

    1980-01-01

    Today most hospital administrators are convinced they should implement long-range planning. The marketing approach to long-range planning is an effective strategy that is consumer oriented. It starts the planning process with the consumer, letting the consumer's needs and wants guide the organization's planning.

  15. Sustainability science: an integrated approach for health-programme planning.

    PubMed

    Gruen, Russell L; Elliott, Julian H; Nolan, Monica L; Lawton, Paul D; Parkhill, Anne; McLaren, Cameron J; Lavis, John N

    2008-11-01

    Planning for programme sustainability is a key contributor to health and development, especially in low-income and middle-income countries. A consensus evidence-based operational framework would facilitate policy and research advances in understanding, measuring, and improving programme sustainability. We did a systematic review of both conceptual frameworks and empirical studies about health-programme sustainability. On the basis of the review, we propose that sustainable health programmes are regarded as complex systems that encompass programmes, health problems targeted by programmes, and programmes' drivers or key stakeholders, all of which interact dynamically within any given context. We show the usefulness of this approach with case studies drawn from the authors' experience.

  16. Advance care planning: re-visioning our ethical approach.

    PubMed

    Robinson, Carole A

    2011-06-01

    This qualitative study explored the applicability and usefulness of a promising advance care planning (ACP) intervention and examined the ACP process. Nine dyads (patients newly diagnosed with advanced lung cancer and a family member) participated in the ACP intervention, with evaluative interviews at 3 and 6 months after the intervention. All interviews were recorded, transcribed verbatim, and analyzed using constant comparison. The process was found not to be one of preparing a substitute decision-maker to speak for oneself and direct health care at a time when one is incapacitated; rather, the families engaged in a deeply relational process where meaning, values, and preferences were negotiated in conversation. ACP is theoretically rooted in a traditional notion of patient autonomy that is not aligned with the relational process that unfolded in this study. An approach that embraces relational autonomy is more congruent and provides a stronger foundation for meeting the needs of families.

  17. A case-based approach to understanding vacation planning

    Treesearch

    Susan I. Stewart; Christine A. Vogt

    1999-01-01

    Vacations provide an opportunity to make many choices, and even for travelers who want their vacations to be spontaneous, planning is often an important part of vacationing. Although descriptive studies of travel planning have sketched out the elements of the vacation plan, these elements have not been drawn together in a conceptual model of the consumer planning...

  18. Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)

    SciTech Connect

    Dickerson, L.S.

    1988-05-01

    The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describes the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs.

  19. Comparison of anatomy-based, fluence-based and aperture-based treatment planning approaches for VMAT

    NASA Astrophysics Data System (ADS)

    Rao, Min; Cao, Daliang; Chen, Fan; Ye, Jinsong; Mehta, Vivek; Wong, Tony; Shepard, David

    2010-11-01

    Volumetric modulated arc therapy (VMAT) has the potential to reduce treatment times while producing comparable or improved dose distributions relative to fixed-field intensity-modulated radiation therapy. In order to take full advantage of the VMAT delivery technique, one must select a robust inverse planning tool. The purpose of this study was to evaluate the effectiveness and efficiency of VMAT planning techniques of three categories: anatomy-based, fluence-based and aperture-based inverse planning. We have compared these techniques in terms of the plan quality, planning efficiency and delivery efficiency. Fourteen patients were selected for this study including six head-and-neck (HN) cases, and two cases each of prostate, pancreas, lung and partial brain. For each case, three VMAT plans were created. The first VMAT plan was generated based on the anatomical geometry. In the Elekta ERGO++ treatment planning system (TPS), segments were generated based on the beam's eye view (BEV) of the target and the organs at risk. The segment shapes were then exported to Pinnacle3 TPS followed by segment weight optimization and final dose calculation. The second VMAT plan was generated by converting optimized fluence maps (calculated by the Pinnacle3 TPS) into deliverable arcs using an in-house arc sequencer. The third VMAT plan was generated using the Pinnacle3 SmartArc IMRT module which is an aperture-based optimization method. All VMAT plans were delivered using an Elekta Synergy linear accelerator and the plan comparisons were made in terms of plan quality and delivery efficiency. The results show that for cases of little or modest complexity such as prostate, pancreas, lung and brain, the anatomy-based approach provides similar target coverage and critical structure sparing, but less conformal dose distributions as compared to the other two approaches. For more complex HN cases, the anatomy-based approach is not able to provide clinically acceptable VMAT plans while highly

  20. Marketing and primary health care: an approach to planning in a Tongan village.

    PubMed

    Finau, S A

    1983-01-01

    Expensive health facilities have failed to meet most health needs. This perceived failure has been interpreted as failure of scientific medicine with subsequent alienation of health facilities. It is therefore necessary to develop primary health care (PHC) programmes shaped around the life patterns of the population it serves. This paper discusses the similarity between marketing concept and providing PHC, and as it was applied to development planning in a village of the Kingdom of Tonga. The issues, circumstances, and approaches discussed, reflect what is desirable from the villagers' viewpoint. In the absence of epidemiological data, there was greater reliance on the villagers' observations to rank priorities. The process of arriving at the final objectives used the marketing approach to provide direction and guideline for discussions for the problems. Marketing can be of assistance in the search for more acceptable and accessible health service and will help to focus on the communities' perspective of their total needs.

  1. Final Report on the Fuel Saving Effectiveness of Various Driver Feedback Approaches

    SciTech Connect

    Gonder, J.; Earleywine, M.; Sparks, W.

    2011-03-01

    This final report quantifies the fuel-savings opportunities from specific driving behavior changes, identifies factors that influence drivers' receptiveness to adopting fuel-saving behaviors, and assesses various driver feedback approaches.

  2. A molecular-genetic approach to studying source-sink interactions in Arabidopsis thalian. Final report

    SciTech Connect

    Gibson, S. I.

    2000-06-01

    This is a final report describing the results of the research funded by the DOE Energy Biosciences Program grant entitled ''A Molecular-Genetic Approach to Studying Source-Sink Interactions in Arabidiopsis thaliana''.

  3. A strategic approach for Water Safety Plans implementation in Portugal.

    PubMed

    Vieira, Jose M P

    2011-03-01

    Effective risk assessment and risk management approaches in public drinking water systems can benefit from a systematic process for hazards identification and effective management control based on the Water Safety Plan (WSP) concept. Good results from WSP development and implementation in a small number of Portuguese water utilities have shown that a more ambitious nationwide strategic approach to disseminate this methodology is needed. However, the establishment of strategic frameworks for systematic and organic scaling-up of WSP implementation at a national level requires major constraints to be overcome: lack of legislation and policies and the need for appropriate monitoring tools. This study presents a framework to inform future policy making by understanding the key constraints and needs related to institutional, organizational and research issues for WSP development and implementation in Portugal. This methodological contribution for WSP implementation can be replicated at a global scale. National health authorities and the Regulator may promote changes in legislation and policies. Independent global monitoring and benchmarking are adequate tools for measuring the progress over time and for comparing the performance of water utilities. Water utilities self-assessment must include performance improvement, operational monitoring and verification. Research and education and resources dissemination ensure knowledge acquisition and transfer.

  4. Aquatic ecosystem condition: The Fraser River Action Plan approach

    SciTech Connect

    Tuominen, T.; Raymond, B.; Sekela, M.; Reynoldson, T.

    1995-12-31

    A major goal of the Canadian government`s Fraser River Action Plan (FRAP) is to clean up existing pollution problems in the Fraser River Basin. In support of this goal, the Environmental Quality Assessment Program is assessing the quality of the aquatic environment, particularly with respect to contaminants. The program, conducted from 1993 to 1998, is to establish a baseline condition for the aquatic ecosystem against which the success of clean up efforts can be measured. The FRAP approach is to use a combination of contaminant exposure or stressor indicators and organism ``effects`` indicators. The focus is on three components of the aquatic ecosystem: (1) bed sediment, (2) resident fish and (3) benthos. A priority for the program is integration of the three components, wherever possible. Bed sediments, as indicators of contaminant stress, are sampled at fourteen reaches in the river and major tributaries. Two species of resident fish are sampled and analyzed for condition factors, enzyme induction, histopathology and contaminant content at each of nine sites in the basin. The resident fish data are providing a measure of contaminant exposure and effect. Organism community effects will be assessed by a study which is classifying approximately 200 tributary and mainstem sites based on benthos community structure. For the first time in a large river system in Canada, this benthos study uses a multivariate approach which relates a suite of chemical and physical characteristics to benthos community structure.

  5. Planning and Evaluating Telecommunications Demonstration Projects and Assessing the Costs of Telecommunications Demonstration Projects. Final Report #146-03.

    ERIC Educational Resources Information Center

    Clippinger, John H.; Fain, Sanford B.

    This two-report volume was prepared to describe approaches for evaluating individual Office of Telecommunications Policy (OTP) demonstration projects in the future and to aid demonstration project directors in project planning and development. The first report focuses on the role of planning and evaluation activities, stressing their importance in…

  6. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    SciTech Connect

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  7. Hydrazine Blending and Storage Facility, Interim Response Action Implementation, Final Sampling Design Plan. Appendix A to Task Plan

    DTIC Science & Technology

    1989-08-30

    Waste Streams, EPA-600/2-80-018, January 1980. GCA Corporation, Quality Assurance Plan, Love Canal Study - Appendix A, Sampling Procedures, EPA Contract...subsequent disposal. &ources GCA Corporation, Quality Assurance Plan, Love Canal Study - Appendix A, Sampling Procedures, EPA Contract 68-02-3168.I I I U

  8. Recovery Planning for Endangered Salmon : A Multiple Attribute Analysis, Final Report,

    SciTech Connect

    Paulsen, Charles M.; Hyman, Jeffrey B.; Wernstedt, Kris

    1993-12-09

    This analysis addresses multiple dimensions or attributes of recovery planning for endangered Snake River chinook stocks. The authors present a range of biological, economic, and social attributes for a number of recovery actions, and discuss aspects of the recovery actions that relate to each attribute. The emphasis on multiple attributes rather than on narrower biological measures alone reflects their belief that biological issues are only one of several sets of concerns that warrant attention in developing a recovery plan. Furthermore, the authors focus on both qualitative and quantitative factors because a lack of numerical information on certain attributes and recovery actions does not justify ignoring the non-numerical attributes or actions. After introducing the approach and providing the background, they define the attributes. An overview is provided of the biological modeling embedded in the analysis. The model used, the Stochastic Life Cycle Model (SLCM), determines the survival changes (relative to a base case) necessary to meet several biological criteria. These criteria reflect both the likelihood of population extinction and the projected population abundance 100 years into the future, relative to the initial abundance. The recovery options are outlined. The passage and harvest actions are characterized across the attributes is provided. The report assesses the life-stage survival improvements deemed necessary to avoid extinction and comments on the likelihood of meeting these improvements with the proposed actions. A cost-effectiveness analysis of the recovery strategies is provided.

  9. Planning phase for the New Mexico Improved Oil Recovery Project. Final report

    SciTech Connect

    Martin, F.D.; Weiss, W.W.

    1991-06-01

    This project is a collaborative effort with Los Alamos National Laboratory, Sandia National Laboratories, and a number of universities throughout the country. Field and laboratory tests were proposed to investigate advanced technologies in reservoir characterization, reservoir simulation, and recovery enhancement. Basically, the approach was to acquire an oilfield property for experimental purposes where interdisciplinary testing could be performed. Several researchers, especially in the academic area, would like to have access to field data and have expressed interest in participating in the project. A standardized dataset from a well-characterized site could be made available to anyone who is developing and validating new simulators. The data-gathering phase should be coordinated fully with the principal users of the data, and all data should be stored in an easily accessible form. A database for the New Mexico Improved Oil Recovery Project (NMIORP) could be established which would be designed for access by various computer networks. Initially, this project provided for a planning phase for the NMIORP. A field site, the Sulimar Queen Unit, has been acquired by New Mexico Tech, and the activities specified in the planning phase have been completed. A data acquisition well was drilled, logged, and cored. Geological and reservoir studies for the Sulimar Queen Unit were conducted. Results of these studies indicate that the Sulimar Queen Unit is a suitable field site for the NMIORP. This report describes the results of the studies that were conducted and outlines possible future tests that could be performed at the field site.

  10. Probabilistic approach to long range planning of manpower

    NASA Technical Reports Server (NTRS)

    Lejk, R. A.

    1967-01-01

    Publication presents a total long range planning model for project oriented organizations. The total model consists of planning systems which originate - /1/ at the project level and consolidate into an overall plan, and /2/ from a budetary ceiling and allocate to the individual projects. Analysis of /1/ and /2/ is provided for management decision making.

  11. Better Forecasting for Better Planning: A Systems Approach.

    ERIC Educational Resources Information Center

    Austin, W. Burnet

    Predictions and forecasts are the most critical features of rational planning as well as the most vulnerable to inaccuracy. Because plans are only as good as their forecasts, current planning procedures could be improved by greater forecasting accuracy. Economic factors explain and predict more than any other set of factors, making economic…

  12. Planning Education: Exchanging Approaches to Teaching Practice-Based Skills

    ERIC Educational Resources Information Center

    Ritchie, Heather; Sheppard, Adam; Croft, Nick; Peel, Deborah

    2017-01-01

    Planning curricula have continually evolved to meet changing societal needs, technological change and employer expectations. The professional accrediting body in the United Kingdom, the Royal Town Planning Institute, stipulates the core planning skills required, differentiating between formal classroom-based learning and professional competencies,…

  13. Planning Education: Exchanging Approaches to Teaching Practice-Based Skills

    ERIC Educational Resources Information Center

    Ritchie, Heather; Sheppard, Adam; Croft, Nick; Peel, Deborah

    2017-01-01

    Planning curricula have continually evolved to meet changing societal needs, technological change and employer expectations. The professional accrediting body in the United Kingdom, the Royal Town Planning Institute, stipulates the core planning skills required, differentiating between formal classroom-based learning and professional competencies,…

  14. A comprehensive business planning approach applied to healthcare.

    PubMed

    Calpin-Davies, P

    The White Paper The New NHS: Modern, Dependable (DoH 1997) clearly expects nurses, in partnership with other professionals, to contribute to the planning and shaping of future healthcare services. This article proposes that comprehensive models of alternative planning frameworks, when applied to healthcare services, can provide nurses with an understanding of the skills they require to participate in the planning process.

  15. A benders decomposition approach to multiarea stochastic distributed utility planning

    NASA Astrophysics Data System (ADS)

    McCusker, Susan Ann

    Until recently, small, modular generation and storage options---distributed resources (DRs)---have been installed principally in areas too remote for economic power grid connection and sensitive applications requiring backup capacity. Recent regulatory changes and DR advances, however, have lead utilities to reconsider the role of DRs. To a utility facing distribution capacity bottlenecks or uncertain load growth, DRs can be particularly valuable since they can be dispersed throughout the system and constructed relatively quickly. DR value is determined by comparing its costs to avoided central generation expenses (i.e., marginal costs) and distribution investments. This requires a comprehensive central and local planning and production model, since central system marginal costs result from system interactions over space and time. This dissertation develops and applies an iterative generalized Benders decomposition approach to coordinate models for optimal DR evaluation. Three coordinated models exchange investment, net power demand, and avoided cost information to minimize overall expansion costs. Local investment and production decisions are made by a local mixed integer linear program. Central system investment decisions are made by a LP, and production costs are estimated by a stochastic multi-area production costing model with Kirchhoff's Voltage and Current Law constraints. The nested decomposition is a new and unique method for distributed utility planning that partitions the variables twice to separate local and central investment and production variables, and provides upper and lower bounds on expected expansion costs. Kirchhoff's Voltage Law imposes nonlinear, nonconvex constraints that preclude use of LP if transmission capacity is available in a looped transmission system. This dissertation develops KVL constraint approximations that permit the nested decomposition to consider new transmission resources, while maintaining linearity in the three

  16. Minimum Value of Eligible Employer-Sponsored Plans and Other Rules Regarding the Health Insurance Premium Tax Credit. Final regulations.

    PubMed

    2015-12-18

    This document contains final regulations on the health insurance premium tax credit enacted by the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010, as amended by the Medicare and Medicaid Extenders Act of 2010, the Comprehensive 1099 Taxpayer Protection and Repayment of Exchange Subsidy Overpayments Act of 2011, and the Department of Defense and Full-Year Continuing Appropriations Act, 2011. These final regulations affect individuals who enroll in qualified health plans through Affordable Insurance Exchanges (Exchanges, sometimes called Marketplaces) and claim the health insurance premium tax credit, and Exchanges that make qualified health plans available to individuals and employers.

  17. Metabolically Derived Human Ventilation Rates: A Revised Approach Based Upon Oxygen Consumption Rates (Final Report, 2009)

    EPA Science Inventory

    EPA announced the availability of the final report, Metabolically Derived Human Ventilation Rates: A Revised Approach Based Upon Oxygen Consumption Rates. This report provides a revised approach for calculating an individual's ventilation rate directly from their oxygen c...

  18. Metabolically Derived Human Ventilation Rates: A Revised Approach Based Upon Oxygen Consumption Rates (Final Report, 2009)

    EPA Science Inventory

    EPA announced the availability of the final report, Metabolically Derived Human Ventilation Rates: A Revised Approach Based Upon Oxygen Consumption Rates. This report provides a revised approach for calculating an individual's ventilation rate directly from their oxygen c...

  19. Patient Protection and Affordable Care Act; establishment of exchanges and qualified health plans; Small Business Health Options Program. Final rule.

    PubMed

    2013-06-04

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act) related to the Small Business Health Options Program (SHOP). Specifically, this final rule amends existing regulations regarding triggering events and special enrollment periods for qualified employees and their dependents and implements a transitional policy regarding employees' choice of qualified health plans (QHPs) in the SHOP.

  20. Final Rule: Extremely Hazardous Substance List and Threshold Planning Quantities; Emergency Planning and Release Notification Requirements (52 FR 13378)

    EPA Pesticide Factsheets

    April 22, 1987: This FR established the list of extremely hazardous substances (EHSs) and their threshold planning quantities (TPQs). Also codified reporting and notification requirements for facilities with EHS. Do not use for current compliance purposes.

  1. The educational approach within Colombia's nutrition plan (PAN)

    NASA Astrophysics Data System (ADS)

    de Pizano, Julia Mejia

    1980-03-01

    With the knowledge that malnutrition affects the quality of life of an individual, the Colombian Government set up in 1976 a unique multi-sectorial plan (PAN), to combat the country's serious malnutrition. Government agencies and private industries in the sectors of production, distribution, health, sanitation, and education have coordinated their previously independent efforts. Among the interesting aspects are the coordination of sectors through work at various levels and through control of the budget, the limitation of bureaucracy, and the decentralization of decision-making. The ongoing attempts to overcome the difficulties encountered include making decisions in the face of inconclusive knowledge on what constitutes a well-balanced diet; combating the lack of knowledge of professionals about the environment of the poorest percentage of the population; and revising the traditional teaching method to make it more successful through a multi-media approach to assure wider coverage and more impact for the least cost, using materials such as games, puppets, posters and radio.

  2. Euro 2012 European Football Championship Finals: planning for a health legacy.

    PubMed

    Smallwood, Catherine A H; Arbuthnott, Katherine G; Banczak-Mysiak, Barbara; Borodina, Mariya; Coutinho, Ana Paula; Payne-Hallström, Lara; Lipska, Elzbieta; Lyashko, Viktor; Miklasz, Miroslaw; Miskiewicz, Paulina; Nitzan, Dorit; Pokanevych, Igor; Posobkiewicz, Marek; Rockenschaub, Gerald; Sadkowska-Todys, Malgorzata; Sinelnik, Svetlana; Smiley, Daniel; Tomialoic, Rysard; Yurchenko, Volodimir; Memish, Ziad A; Heymann, David; Endericks, Tina; McCloskey, Brian; Zumla, Alimuddin; Barbeschi, Maurizio

    2014-06-14

    The revised international health regulations offer a framework that can be used by host countries to organise public health activities for mass gatherings. From June 8, to July 1, 2012, Poland and Ukraine jointly hosted the Union of European Football Associations European Football Championship Finals (Euro 2012). More than 8 million people from around the world congregated to watch the games. Host countries and international public health agencies planned extensively to assess and build capacity in the host countries and to develop effective strategies for dissemination of public health messages. The effectiveness of public health services was maximised through rapid sharing of information between parties, early use of networks of experienced individuals, and the momentum of existing national health programmes. Organisers of future mass gatherings for sporting events should share best practice and their experiences through the WHO International Observer Program. Research about behaviour of large crowds is needed for crowd management and the evidence base translated into practice. A framework to measure and evaluate the legacy of Euro 2012 is needed based on the experiences and the medium-term and long-term benefits of the tournament.

  3. The demand for family planning: a new approach.

    PubMed

    Easterlin, R A; Wongboonsin, K; Ahmed, M A

    1988-01-01

    A new "supply-demand" measure of family planning demand is compared with others commonly used to target prospective family planning clients. In analyses of data from six cross-sectional surveys the new measure consistently explains past contraceptive use better than the others. Time series analysis for two countries yields similar results. Family planning program officials may wish to consider exploring the use of this measure to target prospective clients.

  4. Burrell, Pennsylvania, vicinty property Long-Term Surveillance Plan. Final report

    SciTech Connect

    1993-09-01

    The purpose of this document is to establish elements of the US Department of Energy (DOE) Long-Term Surveillance Plan (LTSP) for the Burrell, Pennsylvania, vicinity property. The US Nuclear Regulatory Commission (NRC) will use this plan to support the issuance of a license for the long-term surveillance and maintenance of the Burrell vicinity property. The DOE and the NRC previously reached agreement regarding the issuance of a license for the Burrell vicinity property. This is a departure from the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, which requires the licensing only of disposal sites, not vicinity properties. However, given the unusually large volume of wastes and the distance from the Canonsburg disposal cell of the Burrell vicinity property, it was agreed that a license for a designed disposal cell with surveillance requirements constituted a reasonable and prudent approach in keeping with the spirit of UMTRCA. The Burrell vicinity property covers approximately 29 hectares (72 acres). Disposal of the 10,500 tonnes (I 1,600 tons) of residual radioactive material (RRM) removed from the Canonsburg Uranium Mill Tailings Remedial Action (UMTRA) Project site took place within an approximately 0.6-hectare (1.6-acre) section in the western portion and an approximately 0.6-hectare (1.6-acre) section in the eastern portion of the Burrell vicinity property. The RRM was brought in as fill for under the ConRail railroad tracks. The excess RRM was placed in a storage location adjacent to the Conemaugh River at Burrell, which was later added to the disposal area. The disposal area contains a total of 78,000 tonnes (86,000 tons) of RRM.

  5. Hospital and medical staff strategic planning: developing an integrated approach.

    PubMed

    Zuckerman, A M

    1994-08-01

    The physician as the principal customer of the hospital is a relatively new concept, indicative of the shift to a more complete market orientation in strategic planning. Although medical staff and medical community dynamics receive increasing attention in strategic planning, much more sophistication is now needed to involve physicians constructively in strategic planning for the hospital and medical staff. While full consonance of physician and hospital plans may be achievable only in a completely integrated delivery system, there is considerable room for improvement in current organizational models.

  6. Breaking the Boundaries: A One-World Approach to Planning Education. Urban Innovation Abroad Series.

    ERIC Educational Resources Information Center

    Sanyal, Bishwapriya, Ed.

    Chapters in this collection present the views of academics and professionals from the Third World who have received their planning education in the west and who now hold posts in western urban and regional planning schools. They discuss the need for a radically changed curriculum based on a comparative, one-world approach to planning education.…

  7. Language Planning and Questions of National Security: An Overview of Planning Approaches

    ERIC Educational Resources Information Center

    Liddicoat, Anthony J.

    2008-01-01

    This paper examines ways in which language planning has been used to address issues of security. It gives an overview of a range of areas of security in which government-level language planning has had a role as a way of developing a typology of language planning work in this area. It examines the nexus between language, communication and security…

  8. Language Planning and Questions of National Security: An Overview of Planning Approaches

    ERIC Educational Resources Information Center

    Liddicoat, Anthony J.

    2008-01-01

    This paper examines ways in which language planning has been used to address issues of security. It gives an overview of a range of areas of security in which government-level language planning has had a role as a way of developing a typology of language planning work in this area. It examines the nexus between language, communication and security…

  9. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  10. Final Report on Regional Exchange Activities During the October 1976-February 1977 Planning Phase.

    ERIC Educational Resources Information Center

    CEMREL, Inc., St. Louis, MO.

    This report describes in detail the Central Midwest Regional Educational Laboratory's (CEMREL) activities during the October 1976-February 1977 planning phase of the nationwide R & D Exchange (RDX) program sponsored by the National Institute of Education. Basically, CEMREL's task during the planning period was to develop plans for the creation and…

  11. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  12. CABPRO: An expert system for process planning multiwire cables. Final report

    SciTech Connect

    Schaefer, R.M.

    1994-04-01

    CABPRO (CABle PROcessor) is a set of computer programs using Artificial Intelligence programming to automatically generate process plans and work instructions in support of the manufacture of multiwire cables. Development of these programs required selecting appropriate hardware and software tools, defining engineering process planning activities, acquiring and representing process planning knowledge, and creating a prototype system. A successful prototype was developed and demonstrated.

  13. International Seminar on National Information Policy and Planning (Dubrovnick, Yugoslavia, June 25-29. 1984). Final Report.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific and Cultural Organization, Paris (France). General Information Programme.

    This is the final report from a seminar organized to provide a forum for information specialists and planners, from both developing and developed countries, to exchange experiences on major issues and problems involved in the formulation of national information policies and plans and their implementation. A primary concern was to examine the…

  14. EPA Finalizes $14 Million Plan to Remove Pollutants from Former Sherwin-Williams Plant in Gibbsboro, New Jersey

    EPA Pesticide Factsheets

    (New York, N.Y.) The U.S. Environmental Protection Agency has finalized a plan to clean up contaminated soil from residential properties at the Sherwin-Williams/Hilliards Creek Superfund site in Gibbsboro and Voorhees, N.J. The site includes a former paint

  15. 77 FR 54922 - Record of Decision for the General Management Plan/Final Environmental Impact Statement, Hampton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ... National Park Service Record of Decision for the General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY: National Park Service, Interior. ACTION: Notice... (NEPA), the National Park Service (NPS) announces the availability of the Record of Decision for the...

  16. 77 FR 24483 - Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Energy Regulatory Commission Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting... 14, 2011. d. Applicant: Wausau Paper Mills, LLC. e. Name of Project: Rhinelander Hydroelectric... Power Act, 16 U.S.C. 791a-825r. h. Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC, 515...

  17. EPA Finalizes $4 Million Cleanup Plan for Fulton Avenue Superfund Site in Hempstead and North Hempstead, N.Y.

    EPA Pesticide Factsheets

    (New York, N.Y.) The U.S. Environmental Protection Agency has finalized its decision to modify an interim cleanup plan originally issued in 2007 to address a portion of the contaminated groundwater at the Fulton Avenue Superfund site in the Towns of North

  18. 59 FR- Availability of the Final Management Plan and Corridor Boundaries for the Main, West Little and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    1994-02-01

    ... Boundaries for the Main, West Little and North Fork Owyhee Rivers AGENCY: Vale District, Bureau of Land... the Main, West Little and North Fork Owyhee Rivers, components of the National Wild and Scenic Rivers... Owyhee Rivers lie entirely within Malheur County, Oregon. ADDRESSES: The Final Management Plan...

  19. 77 FR 76067 - Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... Environmental Impact Statement for the Proposed McCoy Solar Energy Project, CA AGENCY: Bureau of Land Management...) plan amendment and final environmental impact statement (EIS) for the McCoy Solar Energy Project... photovoltaic solar energy generation facility and necessary ancillary facilities including a generation tie...

  20. 75 FR 53735 - Notice of Final Federal Agency Actions on East Lake Sammamish Master Plan Trail in King County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... [Federal Register Volume 75, Number 169 (Wednesday, September 1, 2010)] [Notices] [Pages 53735-53736] [FR Doc No: 2010-21804] DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on East Lake Sammamish Master Plan Trail in King County, WA AGENCY:...

  1. 77 FR 20843 - Record of Decision for the Nabesna Off-Road Vehicle Management Plan and Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... Environmental Impact Statement, Wrangell-St. Elias National Park and Preserve AGENCY: National Park Service... Management Plan and Final Environmental Impact Statement (FEIS), Wrangell-St. Elias National Park and... documents decisions regarding off-road vehicle management in the Nabesna District of Wrangell-St. Elias...

  2. An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information (Final Report)

    EPA Science Inventory

    EPA announced the availability of the final report, An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information. This report is a review of decision-making processes of selected land protection prog...

  3. An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information (Final Report)

    EPA Science Inventory

    EPA announced the availability of the final report, An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information. This report is a review of decision-making processes of selected land protection prog...

  4. EPA Finalizes Plan to Protect Drinking Water in Corozal, P.R., $3 Million Spent to Date

    EPA Pesticide Factsheets

    (New York, N.Y.) The U.S. Environmental Protection Agency has finalized a plan to use natural processes along with the continued use of a system that EPA had already installed to treat contaminated groundwater at the Corozal Well Superfund Site in Corozal,

  5. 75 FR 17756 - Availability of the Final General Management Plan and Environmental Impact Statement (GMP/EIS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ..., natural, and socioeconomic environments. The Final GMP/EIS contains NPS responses to public comments on... relatively insulated from the surrounding urban conditions. Motorized boating would not be appropriate in... the NPS Planning, Environment, and Public Comment Web site ( http://parkplanning.nps.gov )...

  6. Population planning: a well co-ordinated approach required.

    PubMed

    1984-01-01

    of the region explicit or implicit incentives and/or disincentives are included in the population/family planning program. In the Philippine Population Program, incentives are explicitly given only to volunteer program workers. Disincentives are incorporated in the Internal Revenue Code and the Woman and Child Labor Code. In Indonesia preference is given to incentives rather than to disincentives. The government of Bangladesh is seriously considering the introduction of a package deal of incentives and disincentives in an all out effort to reach desired demographic objectives. In Nepal such a package is already in operation. The more recent innovative measures to encourage the 2-child child family norm in India include: increased compensation money to acceptors of sterilization and IUD and giving lottery tickets to acceptors of sterilization. There is recognition in these countries of the need for an integrated approach to population and development programs.

  7. A Study of the Cluster Approach to Secondary Vocational Education in Georgia. Final Report.

    ERIC Educational Resources Information Center

    Scott, C. Paul; Connor, Charles C.

    For use in planning high school vocational education programs, a study examined the success of Georgia vocational cluster programs in finding jobs, the adequacy of program training, and student attitudes towards the cluster approach. (The cluster concept involves broadly defined instructional programs around families of occupations.) The study…

  8. Research in knowledge representation for natural language communication and planning assistance. Final report, 18 March 1985-30 September 1988

    SciTech Connect

    Goodman, B.A.; Grosz, B.; Haas, A.; Litman, D.; Reinhardt, T.

    1988-11-01

    BBN's DARPA project in Knowledge Representation for Natural Language Communication and Planning Assistance has two primary objectives: 1) To perform research on aspects of the interaction between users who are making complex decisions and systems that are assisting them with their task. In particular, this research is focused on communication and the reasoning required for performing its underlying task of discourse processing, planning, and plan recognition and communication repair. 2) Based on the research objectives to build tools for communication, plan recognition, and planning assistance and for the representation of knowledge and reasoning that underlie all of these processes. This final report summarizes BBN's research activities performed under this contract in the areas of knowledge representation and speech and natural language. In particular, the report discusses the work in the areas of knowledge representation, planning, and discourse modeling. We describe a parallel truth maintenance system. We provide an extension to the sentential theory of propositional attitudes by adding a sentential semantics. The report also contains a description of our research in discourse modelling in the areas of planning and plan recognition.

  9. 77 FR 32022 - Direct Final Negative Declaration and Withdrawal of Large Municipal Waste Combustors State Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ... AGENCY 40 CFR Part 62 Direct Final Negative Declaration and Withdrawal of Large Municipal Waste... from ``Large Municipal Waste Combustors'' (LMWC). DATES: This direct final rule will be effective July... Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve Illinois...

  10. Mobilization plan for the Y-12 9409-5 tank storage facility RCRA closure plan. Final report. Revision 1

    SciTech Connect

    1993-11-01

    This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document.

  11. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... Decision- making), the NPS announces the availability of a Final Environmental Impact Statement for the GMP... experiences to be achieved in the Addition. DATES: The National Park Service will execute a Record of Decision...

  12. A New Approach to Community College Master Planning.

    ERIC Educational Resources Information Center

    Demonica, Dominick; Ogurek, Douglas

    2002-01-01

    Discusses the usefulness of a well-defined master plan to community colleges and explores trends in master planning that place more emphasis on issues that attract and retain students; these include the first impression, a sense of place, a concern for the environment, student housing, parking, and partnership zones. (EV)

  13. College and University Strategic Planning: A Methodological Approach.

    ERIC Educational Resources Information Center

    Hollowood, James R.

    A two-year strategic planning methodology is presented by which college administrators can develop a framework for institutional decision-making. After introductory material describing the theoretical characteristics of the methodology, the report outlines and discusses eight basic planning components: (1) developing a context for strategic…

  14. A Social-Action Approach for Planning Education.

    ERIC Educational Resources Information Center

    Bolan, Richard S.; And Others

    The growing complexity of urban industrial society necessitates adequate planning techniques to insure future livability, but traditional methods of training planners have emphasized technology and ignored the human element. To remedy this deficiency, training programs should be expanded to include the social and political aspects of planning.…

  15. Planning Strategically for Communication--A Holistic Approach.

    ERIC Educational Resources Information Center

    Frank, Allan D.

    The primary cause of difficulties in the implementation phase of planned change in business organizations is the lack of a parallel communication plan to facilitate the changes implied by new strategy. Planners usually concentrate on content (the strategy itself) to the neglect of process (how the strategy should be developed and implemented).…

  16. College and University Strategic Planning: A Methodological Approach.

    ERIC Educational Resources Information Center

    Hollowood, James R.

    A two-year strategic planning methodology is presented by which college administrators can develop a framework for institutional decision-making. After introductory material describing the theoretical characteristics of the methodology, the report outlines and discusses eight basic planning components: (1) developing a context for strategic…

  17. Planning the World History Course: A Reasoned Approach to Omission

    ERIC Educational Resources Information Center

    Weinland, Thomas P.

    2012-01-01

    Planning a world history course presents a nearly impossible task. One cannot complete a world history course, or even a European history course, without casting a huge amount of historical information onto the curriculum planning scrapheap. An emphasis on the twentieth century means leaving out significant information from earlier times. "But how…

  18. A New Approach to Community College Master Planning.

    ERIC Educational Resources Information Center

    Demonica, Dominick; Ogurek, Douglas

    2002-01-01

    Discusses the usefulness of a well-defined master plan to community colleges and explores trends in master planning that place more emphasis on issues that attract and retain students; these include the first impression, a sense of place, a concern for the environment, student housing, parking, and partnership zones. (EV)

  19. Planning Strategically for Communication--A Holistic Approach.

    ERIC Educational Resources Information Center

    Frank, Allan D.

    The primary cause of difficulties in the implementation phase of planned change in business organizations is the lack of a parallel communication plan to facilitate the changes implied by new strategy. Planners usually concentrate on content (the strategy itself) to the neglect of process (how the strategy should be developed and implemented).…

  20. Developing a mental health care plan in a low resource setting: the theory of change approach.

    PubMed

    Hailemariam, Maji; Fekadu, Abebaw; Selamu, Medhin; Alem, Atalay; Medhin, Girmay; Giorgis, Tedla Wolde; DeSilva, Mary; Breuer, Erica

    2015-09-28

    Scaling up mental healthcare through integration into primary care remains the main strategy to address the extensive unmet mental health need in low-income countries. For integrated care to achieve its goal, a clear understanding of the organisational processes that can promote and hinder the integration and delivery of mental health care is essential. Theory of Change (ToC), a method employed in the planning, implementation and evaluation of complex community initiatives, is an innovative approach that has the potential to assist in the development of a comprehensive mental health care plan (MHCP), which can inform the delivery of integrated care. We used the ToC approach to develop a MHCP in a rural district in Ethiopia. The work was part of a cross-country study, the Programme for Improving Mental Health Care (PRIME) which focuses on developing evidence on the integration of mental health in to primary care. An iterative ToC development process was undertaken involving multiple workshops with stakeholders from diverse backgrounds that included representatives from the community, faith and traditional healers, community associations, non-governmental organisations, Zonal, Regional and Federal level government offices, higher education institutions, social work and mental health specialists (psychiatrists and psychiatric nurses). The objective of this study is to report the process of implementing the ToC approach in developing mental health care plan. A total of 46 persons participated in four ToC workshops. Four critical path dimensions were identified: community, health facility, administrative and higher level care organisation. The ToC participants were actively engaged in the process and the ToC encouraged strong commitment among participants. Key opportunities and barriers to implementation and how to overcome these were suggested. During the workshops, a map incorporating the key agreed outcomes and outcome indicators was developed and finalized later

  1. A Comparative Study of Strategic HRD Approaches for Workforce Planning in the Tourism Industry

    ERIC Educational Resources Information Center

    Bartlett, Kenneth; Johnson, Karen; Schneider, Ingrid E.

    2006-01-01

    This study compares the outcomes of two often used approaches for strategic HRD planning. Using methods framed within a strategic HRD planning framework the outcomes of a qualitative primary data approach are examined against quantitative labor market projections in a study of the future Minnesota tourism workforce. Results show each planning…

  2. 7 CFR 220.8 - Nutrition standards and menu planning approaches for breakfasts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Nutrition standards and menu planning approaches for... NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SCHOOL BREAKFAST PROGRAM § 220.8 Nutrition standards and menu planning approaches for breakfasts. (a) What are the nutrition standards for...

  3. Curriculum Planning and the Concept of Participation in the Reggio Emilia Pedagogical Approach

    ERIC Educational Resources Information Center

    Hocevar, Andreja; Šebart, Mojca Kovac; Štefanc, Damijan

    2013-01-01

    The article analyses two defining assumptions about the Reggio Emilia (RE) approach: the absence of a planned curriculum designed in advance as a basis for educational work and children's participation in preschools. The authors demonstrate that different approaches to planning preschool education have advantages and disadvantages, which we cannot…

  4. Assessing Changes in Job Behavior Due to Training: A Guide to the Participant Action Plan Approach.

    ERIC Educational Resources Information Center

    Office of Personnel Management, Washington, DC.

    This guide provides a brief introduction to the Participant Action Plan Approach (PAPA) and a user's handbook. Part I outlines five steps of PAPA which determine how job behavior is changed by training course or program participation. Part II, the manual, is arranged by the five steps of the PAPA approach. Planning for PAPA discusses making…

  5. Curriculum Planning and the Concept of Participation in the Reggio Emilia Pedagogical Approach

    ERIC Educational Resources Information Center

    Hocevar, Andreja; Šebart, Mojca Kovac; Štefanc, Damijan

    2013-01-01

    The article analyses two defining assumptions about the Reggio Emilia (RE) approach: the absence of a planned curriculum designed in advance as a basis for educational work and children's participation in preschools. The authors demonstrate that different approaches to planning preschool education have advantages and disadvantages, which we cannot…

  6. Nuclear power plant license renewal environmental life cycle management plan manual: License renewal environmental compliance. Final report

    SciTech Connect

    Doroshuk, B.W.; Tucker, R.L.; Cudworth, J.A.

    1995-10-01

    This manual focuses on preparing to meet NRC environmental requirements for license renewal. It describes a nuclear power plant`s day-to-day environmental protection activities and the relationship between these activities and a plan for preparing a license renewal environmental report supplement. This report is the second phase of a three-phased approach to satisfying license renewal environmental requirements. The first phase involved programmatic planning and resulted in identifying applicable requirements, an approach to meeting the requirements, and any ``fatal flaws`` (EPRI TR-10429 1). This phase involves planning for environmental life cycle management, including project planning for a license renewal environmental report supplement (ERS). The third phase involves preparing an ERS.

  7. US Pharmacopeia Council of Experts 2005-2010: work plans, new revision approaches, and other enhancements.

    PubMed

    Williams, Roger L

    2006-01-01

    The United States Pharmacopeial Convention (the USP Convention), which meets at 5-year intervals, last convened in 2005. At that meeting, the Convention membership elected a new Council of Experts for the 2005-2010 cycle. In turn, the Council elected members of Expert Committees charged with updating and revising the United States Pharmacopeia-National Formulary (USP-NF) and developing other authoritative standards and information. As one of their final activities, Expert Committees from the 2000-2005 cycle and USP staff carefully reviewed their work from the 2000-2005 cycle and reexamined the contents of USP-NF. From this comprehensive inventory emerged an updated and more focused new work plan directed toward acquiring missing monographs, updating monographs (typically because of advances in analytical technologies), and attending to General Chapter work (eg, dividing the General Chapter Chromatography <621> into smaller chapters) during the 2005-2010 cycle. Several elements of the work plan also speak to Resolutions adopted at the March 2005 Convention (available at www.usp.org/aboutUSP/resolutions.html) and prior ones as well. Because the work plan involves new approaches that affect both General Chapters (and thus the performance of tests and procedures) and monograph specifications--as well as the function of Pharmacopeial Forum and the introduction of new products--USP expects the plan to have a broad impact. This article briefly reviews some of these anticipated changes, informs constituents about how they can remain updated about progress and upcoming modifications to official texts, and invites participation in the standards-setting process.

  8. Patient Protection and Affordable Care Act; establishment of the Multi-State Plan Program for the Affordable Insurance Exchanges. Final rule.

    PubMed

    2014-02-24

    The U.S. Office of Personnel Management (OPM) is issuing a final rule implementing modifications to the Multi-State Plan (MSP) Program based on the experience of the Program to date. OPM established the MSP Program pursuant to the Affordable Care Act. This rule clarifies the approach used to enforce the applicable standards of the Affordable Care Act with respect to health insurance issuers that contract with OPM to offer MSP options; amends MSP standards related to coverage area, benefits, and certain contracting provisions under section 1334 of the Affordable Care Act; and makes non-substantive technical changes.

  9. Final Report: Evaluation of Tools and Metrics to Support Employer Selection of Health Plans.

    PubMed

    Mattke, Soeren; Van Busum, Kristin R; Martsolf, Grant R

    2014-01-01

    The Patient Protection and Affordable Care Act (ACA) places strong emphasis on quality of care as a means to improve outcomes for Americans and promote the financial sustainability of our health care system. Included in the ACA are new disclosure requirements that require health plans to provide a summary of benefits and coverage that accurately describes the benefits under the plan or coverage. These requirements are intended to support employers' procurement of high-value health coverage for their employees. This study attempts to help employers understand the structural differences between health plans and the performance dimensions along which plans can differ, as well as to educate employers about available tools that can be used to evaluate plan options. The study also discusses the extent to which these and other tools or resources are used by employers to inform choices between health plans.

  10. Final Report: Evaluation of Tools and Metrics to Support Employer Selection of Health Plans

    PubMed Central

    Mattke, Soeren; Van Busum, Kristin R.; Martsolf, Grant R.

    2014-01-01

    Abstract The Patient Protection and Affordable Care Act (ACA) places strong emphasis on quality of care as a means to improve outcomes for Americans and promote the financial sustainability of our health care system. Included in the ACA are new disclosure requirements that require health plans to provide a summary of benefits and coverage that accurately describes the benefits under the plan or coverage. These requirements are intended to support employers' procurement of high-value health coverage for their employees. This study attempts to help employers understand the structural differences between health plans and the performance dimensions along which plans can differ, as well as to educate employers about available tools that can be used to evaluate plan options. The study also discusses the extent to which these and other tools or resources are used by employers to inform choices between health plans. PMID:28083334

  11. Language Management Theory as One Approach in Language Policy and Planning

    ERIC Educational Resources Information Center

    Nekvapil, Jirí

    2016-01-01

    Language Policy and Planning is currently a significantly diversified research area and thus it is not easy to find common denominators that help to define basic approaches within it. Richard B. Baldauf attempted to do so by differentiating between four basic approaches: (1) the classical approach, (2) the language management approach (Language…

  12. Language Management Theory as One Approach in Language Policy and Planning

    ERIC Educational Resources Information Center

    Nekvapil, Jirí

    2016-01-01

    Language Policy and Planning is currently a significantly diversified research area and thus it is not easy to find common denominators that help to define basic approaches within it. Richard B. Baldauf attempted to do so by differentiating between four basic approaches: (1) the classical approach, (2) the language management approach (Language…

  13. The Path to Finally Realizing the Adaptive Planning Vision of Defense Secretaries Rumsfeld and Gates

    DTIC Science & Technology

    2009-04-03

    5 The 2005 Contingency Planning Guidance by the SecDef directed Combatant Commanders (CCDRs) to develop designated, priority contingency ...of national strategic objectives and national military strategy to shape events, meet contingencies , and respond to unforeseen crises. Planning is...and contingency planners is overwhelming and it completely inhibits progress to create a plan that DoD can execute. This constitutes one of the major

  14. Regional Urban Planning for Energy Conservation: Alternative Approaches.

    ERIC Educational Resources Information Center

    Manohar, Shri

    1982-01-01

    Discusses the role of urban and regional planners in redesigning land use patterns which reinforce energy conservation while preserving satisfying living conditions. A model for evaluating energy conservation planning alternatives for Perth, Australia is described. (AM)

  15. Regional Urban Planning for Energy Conservation: Alternative Approaches.

    ERIC Educational Resources Information Center

    Manohar, Shri

    1982-01-01

    Discusses the role of urban and regional planners in redesigning land use patterns which reinforce energy conservation while preserving satisfying living conditions. A model for evaluating energy conservation planning alternatives for Perth, Australia is described. (AM)

  16. Coordinating robot motion, sensing, and control in plans. LDRD project final report

    SciTech Connect

    Xavier, P.G.; Brown, R.G.; Watterberg, P.A.

    1997-08-01

    The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The project considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.

  17. Environmental planning, ecosystem science, and ecosystem approaches for integrating environment and development

    NASA Astrophysics Data System (ADS)

    Slocombe, D. Scott

    1993-05-01

    Currently popular concepts such as sustainable development and sustainability seek the integration of environment and development planning. However, there is little evidence that this integration is occurring in either mainstream development planning or environmental planning. This is a function of the history, philosophies, and evolved roles of both. A brief review of the experience and results of mainstream planning, environmental planning, and ecosystem science suggests there is much in past scientific and professional practice that is relevant to the goal of integrated planning for environment and development, but still such commonly recommended reforms as systems and multidisciplinary approaches, institutional integration, and participatory, goal-oriented processes are rarely achieved. “Ecosystem approaches,” as developed and applied in ecology, human ecology, environmental planning, anthropology, psychology, and other disciplines, may provide a more transdisciplinary route to successful integration of environment and development. Experience with ecosystem approaches is reviewed, their advantages and disadvantages are discussed, and they are compared to traditional urban and regional planning, environmental planning, and ecosystem science approaches. Ultimately a synthesis of desirable characteristics for a framework to integrate environment and development planning is presented as a guide for future work and a criterion for evaluating existing programs.

  18. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    SciTech Connect

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  19. An approach to family planning for Indochinese refugee women.

    PubMed

    Presswell, N J

    1982-08-01

    Family planning services were introduced in Vietnam by the Americans about 20 years ago, but on a limited basis. Many of the Vietnamese refugee women have had no contact with such services. Abortion was illegal until 1975 in South Vietnam, but since the takeover, abortion clinics have been available as part of the public hospital system. Family planning was available in some of the refugee camps. Most of the Vietnam refugees fled their country by boat. Before their acceptance by Australia, the Vietnamese refugees have health checks by the Australian Commonwealth Health Department in the country of transit. Shortly after their arrival in Australia, health screening is done by the State Health Department. The majority of refugees are accommodated in migrant hostels for the 1st 3-12 months. Family planning is incorporated into Eastbridge Hostel's orientation program. During participation in some family planning discussion groups with the Indochinese refugees, it was observed that the women were particularly shy and hesitant to talk about sexual concerns in a large group or in mixed company. As personal matters are dealt with in the family, it is preferable to have a female as a discussion leader and interpreter. Visual aids such as a display of contraceptive devices, a model showing female anatomy and a family planning film for non-English speaking migrants are particularly useful. As a female doctor using a female interpreter the aim was to provide an accessible service for Indochinese women with family planning inquiries or gynecological problems. It is important that the interpreter is present in the consulting room. Nonverbal cues are most important and particular attention should be paid to establishing eye contact with the patient. Simple miming techniques or the use of diagrams may be helpful in reinforcing the work of the interpreter. When listening to the patient, it is useful to look and listen for nonverbal cues from them. Between February 1980 and May 1981

  20. Mission planning for on-orbit servicing through multiple servicing satellites: A new approach

    NASA Astrophysics Data System (ADS)

    Daneshjou, K.; Mohammadi-Dehabadi, A. A.; Bakhtiari, M.

    2017-09-01

    In this paper, a novel approach is proposed for the mission planning of on-orbit servicing such as visual inspection, active debris removal and refueling through multiple servicing satellites (SSs). The scheduling has been done with the aim of minimization of fuel consumption and mission duration. So a multi-objective optimization problem is dealt with here which is solved by employing particle swarm optimization algorithm. Also, Taguchi technique is employed for robust design of effective parameters of optimization problem. The day that the SSs have to leave parking orbit, transfer duration from parking orbit to final orbit, transfer duration between one target to another, and time spent for the SS on each target are the decision parameters which are obtained from the optimization problem. The raised idea is that in addition to the aforementioned decision parameters, eccentricity and inclination related to the initial orbit and also phase difference between the SSs on the initial orbit are identified by means of optimization problem, so that the designer has not much role on determining them. Furthermore, it is considered that the SS and the target rendezvous at the servicing point and the SS does not perform any phasing maneuver to reach the target. It should be noted that Lambert theorem is used for determination of the transfer orbit. The results show that the proposed approach reduces the fuel consumption and the mission duration significantly in comparison with the conventional approaches.

  1. Federal work plan: an agreement commitment report from the Chesapeake Executive Council. Final report

    SciTech Connect

    Not Available

    1988-07-01

    The work plan describes each participating Federal agency's Bay initiatives and the current level of coordination, outlines a process for expanding that cooperation, and indicates future directions for agency efforts in support of the 1987 Bay Agreement. The plan includes projections of possible projects and programs which may be the basis for coordinated, complementary budget proposals in the future.

  2. Develop a State Plan for Career Education. Final Report, July 1, 1976 to June 30, 1977.

    ERIC Educational Resources Information Center

    Utah State Board of Education, Salt Lake City.

    A draft for a state plan for career education was developed in Utah. To provide the necessary information on which to base such a plan, career education needs assessments were conducted of students on the elementary and secondary school levels. Eight questionnaires were also developed and administered for an institutional needs assessment. The…

  3. EPA Finalizes Changes to Plan for Groundwater Remediation at Superfund Site in Newfield, N.J.

    EPA Pesticide Factsheets

    (New York, N.Y.) The U.S. Environmental Protection Agency has modified its plan to address contaminated groundwater at the Shieldalloy Metallurgical Corp. site in Newfield and Vineland, N.J. A plan originally put into place in 1996 by the New Jersey Depart

  4. 77 FR 74027 - Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-12

    ..., Yellowstone National Park, Idaho, Montana, and Wyoming AGENCY: National Park Service, Interior. ACTION: Notice... Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of the National... availability of the Amended Record of Decision for the Winter Use Plan for Yellowstone National Park,...

  5. Ten Year Plan for the Redevelopment of Intellectual Disability Services: Consumers' Guide. Final Report.

    ERIC Educational Resources Information Center

    Neilson Associates Pty. Ltd., Melbourne (Australia).

    This consumers' guide provides an easily understandable, large print summary of the recommendations in a 10-year plan for changes in services to people with intellectual disabilities in Victoria, Australia. Twenty of the 250 recommendations of the plan are given in simplified language accompanied by illustrations, including recommendations for:…

  6. Ten Year Plan for the Redevelopment of Intellectual Disability Services. Final Report.

    ERIC Educational Resources Information Center

    Neilson Associates Pty. Ltd., Melbourne (Australia).

    This report recommends a 10-year plan for changes in services to people with intellectual disabilities in Victoria, Australia. Intended key outcomes of the plan include: increases in the numbers of clients receiving direct residential support in community-based accommodations; reductions in numbers of adult clients resident in large scale…

  7. Our Human Resources Indiana Mental Retardation Residential Services Planning Project. Final Report.

    ERIC Educational Resources Information Center

    Indiana State Dept. of Mental Health, Indianapolis. Div. of Mental Retardation.

    The report is said to provide a plan for meeting the total needs (educational, personal, and vocational) of the mentally retarded for both service and residential living in Indiana. The plan proposes to bring the state hospital and community closer together and to offer several options that include the natural, foster, and small group home and the…

  8. Ten Year Plan for the Redevelopment of Intellectual Disability Services: Consumers' Guide. Final Report.

    ERIC Educational Resources Information Center

    Neilson Associates Pty. Ltd., Melbourne (Australia).

    This consumers' guide provides an easily understandable, large print summary of the recommendations in a 10-year plan for changes in services to people with intellectual disabilities in Victoria, Australia. Twenty of the 250 recommendations of the plan are given in simplified language accompanied by illustrations, including recommendations for:…

  9. Defense Nuclear Agency Total Quality Management (TQM) implementation plan. Quality management (Final)

    SciTech Connect

    Not Available

    1989-01-01

    The report is the TQM Implementation Plan adopted by the Defense Nuclear Agency. It is based on the DoD Total Quality Management Master Plan, and lists short-, mid-, and long-range goals. A hard copy of slides on the topic of TQM implementation at the Defense Nuclear Agency is attached.

  10. Strategic Planning and Energy Options Analysis for the Fort Peck Assiniboine and Sioux Tribes. Final report

    SciTech Connect

    Williamson, Jim S; Greenwood Village, CO 80112

    2007-03-31

    Strategic Planning and Energy Options Analysis provides the Fort Peck Tribes with a tool to build analytical capabilities and local capacity to extract the natural and energy resource potential for the benefit of the tribal community. Each resource is identified irrespective of the development potential and is viewed as an absolute resulting in a comprehensive resource assessment for Tribal energy planning

  11. Comprehensive research plan: an agreement commitment report from the Chesapeake Executive Council. Final report

    SciTech Connect

    Not Available

    1988-07-01

    The plan outlines a process for meeting long-term research needs of the Chesapeake Bay Program. Recommendations include establishing the Research Planning Committee as a standing committee, development of a Chesapeake Bay research directory to be updated annually, an annual assessment of the previous year's research achievements, and an annual listing of research priorities including estimates of funding and resource requirements.

  12. Ten Year Plan for the Redevelopment of Intellectual Disability Services. Final Report.

    ERIC Educational Resources Information Center

    Neilson Associates Pty. Ltd., Melbourne (Australia).

    This report recommends a 10-year plan for changes in services to people with intellectual disabilities in Victoria, Australia. Intended key outcomes of the plan include: increases in the numbers of clients receiving direct residential support in community-based accommodations; reductions in numbers of adult clients resident in large scale…

  13. Fort Devens Feasibility Study (FS) for Group 1A Sites, Final Data Gap Activities Work Plan

    DTIC Science & Technology

    1993-03-01

    function and value assessment. Macroinvertebrate studies at both landfills will be conducted to evaluate whether the benthic macroinvertebrate ...Davies (1987) provides instructions for sorting collected benthic macroinvertebrate samples. Macroinvertebrates will be identified to the genus or...4.2 RATIONALE AND PLAN FOR WETLAND FUNCTIONAL ASSESSMENT ...................................... 4-5 4.3 RATIONALE AND PLANS FOR MACROINVERTEBRATE 3

  14. Approaches to determining Final Ecosystem Goods and Services: Benefits and Beneficiaries

    EPA Science Inventory

    By nature, the concept of ‘Final’ Ecosystem Goods and Services (FEGS) poses the question; to what or to whom are these goods and services final? We identify two main approaches theoreticians and practitioners are using to define and perceive FEGS (note: we recognize t...

  15. Approaches to determining Final Ecosystem Goods and Services: Benefits and Beneficiaries

    EPA Science Inventory

    By nature, the concept of ‘Final’ Ecosystem Goods and Services (FEGS) poses the question; to what or to whom are these goods and services final? We identify two main approaches theoreticians and practitioners are using to define and perceive FEGS (note: we recognize t...

  16. Implications of Climate Change for State Bioassessment Programs and Approaches to Account for Effects (Final Report)

    EPA Science Inventory

    EPA announced the availability of the final report, Implications of Climate Change for State Bioassessment Programs and Approaches to Account for Effects. This report uses biological data collected by four states in wadeable rivers and streams to examine the components ...

  17. A Whole Family Approach to Teaching English as a Second Language. Final Report.

    ERIC Educational Resources Information Center

    Johnson, Bill; And Others

    This final report provides descriptive and evaluative information on a 2-year demonstration project conducted at Des Moines Area Community College, as well as the curriculum guides developed during the project to meet the English language and cultural adaptation needs of refugee adults and children using a family approach. Initial sections of the…

  18. Implications of Climate Change for State Bioassessment Programs and Approaches to Account for Effects (Final Report)

    EPA Science Inventory

    EPA announced the availability of the final report, Implications of Climate Change for State Bioassessment Programs and Approaches to Account for Effects. This report uses biological data collected by four states in wadeable rivers and streams to examine the components ...

  19. The Portfolio Approach Developed to Underpin the Capital Investment Program Plan Review (CIPPR)

    DTIC Science & Technology

    2014-11-06

    Basinger, Director, DCI, CFD Scientific Letter The PORTFOLIO APPROACH developed to underpin the Capital Investment Program Plan Review (CIPPR) To better...the key concepts about the new analytical approach that has been used to produce alternative project portfolios for consideration within the Capital ...the umbrella of the portfolio approach described herein. Background The Capital Investment Program Plan Review (CIPPR) was formally initiated through a

  20. System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

    SciTech Connect

    Zhu, Charles

    2015-05-15

    In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information

  1. Oral contraceptive use and cancer: final report from the Oxford-Family Planning Association contraceptive study.

    PubMed

    Vessey, Martin; Yeates, David

    2013-12-01

    This analysis provides the final results on cancer incidence in relation to oral contraceptive (OC) use from the Oxford-Family Planning Association (Oxford-FPA) contraceptive study, which closed at the end of 2010. An additional 6 years of observation have been added since our last report and there has been an increase in the numbers of cancers of over 50% at seven of the sites considered. The Oxford-FPA study includes 17032 women aged 25-39 years recruited from 1968 to 1974 at contraceptive clinics in England and Scotland. These women were using OCs, a diaphragm or an intrauterine device. Information about cancer incidence among them has been collected from recruitment until closure of the study. OC use was not related to nonreproductive cancer. Breast cancer findings (1087 cases) were entirely negative; the rate ratio (RR) comparing ever users of OCs with never users was 1.0 [95% confidence interval (CI): 0.9-1.1]. Only two cases of cervical cancer have been added since our last report (total: 61 cases); the RR comparing ever use with never use is now 3.4 (95% CI: 1.6-8.9). The risk of this disease increases sharply with duration of OC use and declines steadily with interval since last OC use. OC use protects against both uterine body cancer (124 cases) and ovarian cancer (143 cases). The RRs comparing ever use with never use were 0.5 (95% CI: 0.3-0.7) and 0.5 (95% CI: 0.4-0.7), respectively. Protection against both these cancers increased with duration of OC use and waned with interval since last use, but an effect was still present 28 or more years after discontinuation. In our study, OC use had no effect on nonreproductive cancers or on breast cancer. The risk of cervical cancer was increased and that of uterine body cancer and ovarian cancer was decreased by OC use. All these effects increased with duration of use and declined with interval since last use. The beneficial effects of OC use on cancer outweighed the adverse effects. These findings should

  2. A plan for structured management of the Systems Approach to Training (SAT) process

    SciTech Connect

    Schurman, D.L.

    1987-01-01

    This paper describes the plan and accomplishments for development of a Systematic Management Plan for the Systems Approach to Training (SMPSAT). This project is sponsored by the United States Marine Corps Headquarters training policy branch (HQMC(TAP)). Purpose of this effort is to develop a comprehensive plan for management of the Systems Approach to Training (SAT) system in the USMC. This management plan will allow HQMC to monitor the SAT system in order to provide maximum support to the SAT system in both the formal schools and the Fleet Marine Force.

  3. A systematic approach to the planning, implementation, monitoring, and evaluation of integrated health services.

    PubMed

    Reynolds, Heidi W; Sutherland, Elizabeth G

    2013-05-06

    Because of the current emphasis and enthusiasm focused on integration of health systems, there is a risk of piling resources into integrated strategies without the necessary systems in place to monitor their progress adequately or to measure impact, and to learn from these efforts. The rush to intervene without adequate monitoring and evaluation will continue to result in a weak evidence base for decision making and resource allocation. Program planning and implementation are inextricability linked to monitoring and evaluation. Country level guidance is needed to identify country-specific integrated strategies, thereby increasing country ownership. This paper focuses on integrated health services but takes into account how health services are influenced by the health system, managed by programs, and made up of interventions. We apply the principles in existing comprehensive monitoring and evaluation (M&E) frameworks in order to outline a systematic approach to the M&E of integration for the country level. The approach is grounded by first defining the country-specific health challenges that integration is intended to affect. Priority points of contact for care can directly influence health, and essential packages of integration for all major client presentations need to be defined. Logic models are necessary to outline the plausible causal pathways and define the inputs, roles and responsibilities, indicators, and data sources across the health system. Finally, we recommend improvements to the health information system and in data use to ensure that data are available to inform decisions, because changes in the M&E function to make it more integrated will also facilitate integration in the service delivery, planning, and governance components. This approach described in the paper is the ideal, but its application at the country level can help reveal gaps and guide decisions related to what health services to prioritize for integration, help plan for how to

  4. Mobile transporter path planning using a genetic algorithm approach

    NASA Technical Reports Server (NTRS)

    Baffes, Paul; Wang, Lui

    1988-01-01

    The use of an optimization technique known as a genetic algorithm for solving the mobile transporter path planning problem is investigated. The mobile transporter is a traveling robotic vehicle proposed for the Space Station which must be able to reach any point of the structure autonomously. Specific elements of the genetic algorithm are explored in both a theoretical and experimental sense. Recent developments in genetic algorithm theory are shown to be particularly effective in a path planning problem domain, though problem areas can be cited which require more research. However, trajectory planning problems are common in space systems and the genetic algorithm provides an attractive alternative to the classical techniques used to solve these problems.

  5. WastePlan model implementation for New York State. Final report

    SciTech Connect

    Visalli, J.R.; Blackman, D.A.

    1995-07-01

    WastePlan is a computer software tool that models solid waste quantities, costs, and other parameters on a regional basis. The software was developed by the Tellus Institute, a nonprofit research and consulting firm. The project`s objective was to provide local solid waste management planners in New York State responsible to develop and implement comprehensive solid waste management plans authorized by the Solid Waste Management Act of 1988, with a WastePlan model specifically tailored to fit the demographic and other characteristics of New York State and to provide training and technical support to the users. Two-day workshops were held in 1992 to introduce planners to the existing versions; subsequently, extensive changes were made to the model and a second set of two-day workshops were held in 1993 to introduce planners to the enhanced version of WastePlan. Following user evaluations, WastePlan was further modified to allow users to model systems using a simplified version, and to incorporate report forms required by New York State. A post-project survey of trainees revealed limited regular use of software. Possible reasons include lack of synchronicity with NYSDEC planning process; lack of computer literacy and aptitude among trainees; hardware limitations; software user-friendliness; and the work environment of the trainees. A number of recommendations are made to encourage use of WastePlan by local solid waste management planners.

  6. Prism: a new approach to radiotherapy planning software.

    PubMed

    Kalet, I J; Jacky, J P; Austin-Seymour, M M; Hummel, S M; Sullivan, K J; Unger, J M

    1996-09-01

    We describe the capabilities and performance of Prism, an innovative new radiotherapy planning system with unusual features and design. The design and implementation strategies are intended to assure high quality and clinical acceptability. The features include Artificial Intelligence tools and special support for multileaf collimator (MLC) systems. The design provides unusual flexibility of operation and ease of expansion. We have implemented Prism, a three-dimensional (3D) radiotherapy treatment-planning system on standard commercial workstations with the widely available X window system. The design and implementation use ideas taken from recent software engineering research, for example, the use of behavioral entity-relationship modeling and the "Mediator Method" instead of ad-hoc programming. The Prism system includes the usual features of a 3D planning system, including Beam's Eye View and the ability to simulate any treatment geometry possible with any standard radiotherapy accelerator. It includes a rule-based expert system for automated generation of the planning target volume as defined in ICRU Report 50. In addition, it provides special support for planning treatments with a multileaf collimator (MLC). We also implemented a Radiotherapy Treatment Planning Tools Foundation for Prism, so that we are able to use software tools form other institutions without any source code modification. The Prism system has been in clinical operation at the University of Washington since July 1994 and has been installed at several other clinics. The system is run simultaneously by several users, each with their own workstation operating from a common networked database and software. In addition to the dosimetrists, the system is used by radiation oncologists to define tumor and target volumes and by radiation therapists to select treatment setups to load into a computer controlled accelerator. Experience with the installation and operation has shown the design to be

  7. Interim final rules for group health plans and health insurance issuers relating to internal claims and appeals and external review processes under the Patient Protection and affordable Care Act. Interim final rules with request for comments.

    PubMed

    2010-07-23

    This document contains interim final regulations implementing the requirements regarding internal claims and appeals and external review processes for group health plans and health insurance coverage in the group and individual markets under the Patient Protection and Affordable Care Act. The regulations will generally affect health insurance issuers; group health plans; and participants, beneficiaries, and enrollees in health insurance coverage and in group health plans. The regulations provide plans and issuers with guidance necessary to comply with the law.

  8. National Institute on Disability and Rehabilitation Research--Notice of Final Long-Range Plan for Fiscal Years 2005-2009. Federal Register, Part III: Department of Education

    ERIC Educational Resources Information Center

    National Archives and Records Administration, 2006

    2006-01-01

    The Assistant Secretary for Special Education and Rehabilitative Services (OSERS) publishes the Final Long-Range Plan (Final Plan) for the National Institute on Disability and Rehabilitation Research (NIDRR) for FY 2005 through 2009. As required by the Rehabilitation Act of 1973, as amended (Act), the Assistant Secretary takes this action to…

  9. Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Quality Control Plan

    DTIC Science & Technology

    1995-05-01

    0)N Final Quality Control Plan Remedial Investigation and Feasibility Study of the Defense Property Disposal Office Fort George G. Meade, Maryland...8 2.1.2 Remedial Investigation Project Manager ................. 8 2.1.3 Feasibility Study Project Manager ..................... 8...20 4.0 SAMPLE COLLECTION ................................. 21 4.1 Sampling for the Remedial Investigation at the DRMO Yard ....... 21 4.1.1

  10. Family Planning Research in a Developing Area: A Different Approach.

    ERIC Educational Resources Information Center

    Fathi, Asghar; Watson, Walter B.

    The authors discuss the difficulties in adapting American methods of field work to the cultural conditions in pre-industrial societies, in this case a pilot study on family planning in a Middle Eastern Moslem country. It is demonstrated that if the researcher is native and has kinship ties in a traditional community, he can use these assets: (1)…

  11. Planning for School Transition: An Ecological-Developmental Approach.

    ERIC Educational Resources Information Center

    Diamond, Karen E.; And Others

    1988-01-01

    The paper describes an ecological-developmental model for planning a child's transition from a preschool special education program to a public school classroom. The model stresses interactions between the various environments in which the child functions. A description of a preschool transition program based on the model is also included.…

  12. A stochastic optimization approach for integrated urban water resource planning.

    PubMed

    Huang, Y; Chen, J; Zeng, S; Sun, F; Dong, X

    2013-01-01

    Urban water is facing the challenges of both scarcity and water quality deterioration. Consideration of nonconventional water resources has increasingly become essential over the last decade in urban water resource planning. In addition, rapid urbanization and economic development has led to an increasing uncertain water demand and fragile water infrastructures. Planning of urban water resources is thus in need of not only an integrated consideration of both conventional and nonconventional urban water resources including reclaimed wastewater and harvested rainwater, but also the ability to design under gross future uncertainties for better reliability. This paper developed an integrated nonlinear stochastic optimization model for urban water resource evaluation and planning in order to optimize urban water flows. It accounted for not only water quantity but also water quality from different sources and for different uses with different costs. The model successfully applied to a case study in Beijing, which is facing a significant water shortage. The results reveal how various urban water resources could be cost-effectively allocated by different planning alternatives and how their reliabilities would change.

  13. An Approach to Quantitative Fiscal Planning. Phase I Report.

    ERIC Educational Resources Information Center

    Gaylord, Thomas A.

    The development of time-series revenue projections for University of Alaska Budget Request Units (BRUs) is described. Fiscal planning modes in higher education are reviewed, along with the attributes of judgmental, time-series, and causal forecasting techniques. The following six submodels comprise the necessary dimensions of the comprehensive…

  14. Two Approaches to Educational Planning: Conflict and Complementarity

    ERIC Educational Resources Information Center

    Sanyal, Bikas C.

    1973-01-01

    The author writes in favor of gearing educational systems to long-term manpower requirements as he responds to Professor Mark Blaug's article ("Prospects" v2, n4, Winter 1973) which advocates cost-benefit analysis as a tool for educational planning. (JH)

  15. A Holistic Approach to Family Planning Counseling and Education.

    ERIC Educational Resources Information Center

    Chaves, Lushanhya Coutinho; And Others

    A family planning clinic which was part of a large public maternity hospital in Salvador Bahia, Brazil received a grant to expand its services and to evaluate a service model focusing on client counseling and education. The counseling, education, and service provision process included individual pre-consultation with a nurse, group education and…

  16. An Approach to Planned Change in A College Setting.

    ERIC Educational Resources Information Center

    Crookston, Burns B.; Blaesser, Willard W.

    The elements of planned change outlined in this article, while directed toward a student personnel program, may also prove useful if applied to other aspects of the college program. One useful scheme for thinking about change describes it as a level or phase of behavior within an institutional setting, not as a static "habit" or "custom," but as a…

  17. Strategic by Design: Iterative Approaches to Educational Planning

    ERIC Educational Resources Information Center

    Chance, Shannon

    2010-01-01

    Linear planning and decision-making models assume a level of predictability that is uncommon today. Such models inadequately address the complex variables found in higher education. When academic organizations adopt paired-down business strategies, they restrict their own vision. They fail to harness emerging opportunities or learn from their own…

  18. Strategic by Design: Iterative Approaches to Educational Planning

    ERIC Educational Resources Information Center

    Chance, Shannon

    2010-01-01

    Linear planning and decision-making models assume a level of predictability that is uncommon today. Such models inadequately address the complex variables found in higher education. When academic organizations adopt paired-down business strategies, they restrict their own vision. They fail to harness emerging opportunities or learn from their own…

  19. Improving Library Performance: Quantitative Approaches to Library Planning.

    ERIC Educational Resources Information Center

    Webster, Duane E.

    The use of analytical models and quantitative methods for both short- and long-range problem solving offer library managers an excellent opportunity to improve and rationalize decision-making for strategic and organizational planning. The first step is to identify the problems confronting the library and understand its current capabilities.…

  20. 75 FR 36064 - Stellwagen Bank National Marine Sanctuary Final Revised Management Plan: Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ....noaa.gov . For a hard copy or data CD of the plan contact the sanctuary office at the contact number... FURTHER INFORMATION CONTACT: Anne Smrcina, Stellwagen Bank National Marine Sanctuary, 175 Edward Foster...

  1. The Final Clean Power Plan: More Ambitious, More Achievable for States

    EPA Pesticide Factsheets

    Today, President Obama announced EPA's historic Clean Power Plan , a first-of-its-kind step to cut the harmful carbon pollution fueling climate change from our nation's power plants. Climate change thre

  2. Land use planning and oil and gas leasing on onshore federal lands. Final report

    SciTech Connect

    Not Available

    1989-11-01

    The Federal Onshore Oil and Gas Leasing Reform Act of 1987 required a study by the Comptroller General of the United States and the National Academy of Sciences to recommend any improvements that may be necessary to insure that potential oil and gas resources are adequately addressed in planning documents; the social, economic, and environmental consequences of exploration and development of oil and gas resources are determined; and any stipulations to be applied to oil and gas leases are clearly identified. The report identifies problems in land use planning that are caused by current leasing practices and the availability and reliability of information at the planning stage. The recommendations address the interrelation between oil and gas leasing decisions and the land use planning process for the federal lands.

  3. Environmental guidelines for development of Cultural Resource Management plans. Final report

    SciTech Connect

    1995-08-01

    The purpose of this document is to provide guidelines to the DOE field managements with responsibility for the development of an individual Cultural Resource Management Plan for each DOE facility and program.

  4. EPA Finalizes Cleanup Plan for the Nuclear Metals Site in Concord, Mass.

    EPA Pesticide Factsheets

    EPA has completed the Record of Decision (ROD) for the Nuclear Metals, Inc. Superfund Site, located in Concord, Mass. The ROD outlines a detailed plan for cleaning up contaminated soil, sediment and groundwater at the Site.

  5. Final 5-year plan for oil and gas development in the outer continental shelf

    NASA Astrophysics Data System (ADS)

    The five year plan for oil and gas development in the outer continental shelf was discussed, considering such aspects as protecting marine, coastal, and human environments, as well as, our energy needs.

  6. Oil-spill contingency planning: National status. A report to the President. Final report

    SciTech Connect

    Not Available

    1990-10-01

    The report examines the Nation's oil spill preparedness and response system in the wake of the Exxon Valdez disaster. It describes the nationwide oil spill response system, including the Federal Government's National Response System; the status of Federal, state, local and industry contingency planning; the adequacy of exercises testing oil spill plans; the effectiveness of oil spill contingency plans; and the development, response, and shortfall assessment of worst-case scenarios. The document also addresses key environmental and health concerns, including the potential for contamination of the food chain, the emotional and social stress that accompany significant spills, and strategies for mitigating these hazards. An extensive set of appendices summarizes regional response team contingency plans. The report emphasizes that prevention activities remain the best protection against oil spills, regardless of the effectiveness of response capabilities.

  7. Burn disaster response planning: an urban region's approach.

    PubMed

    Yurt, Roger W; Lazar, Eliot J; Leahy, Nicole E; Cagliuso, Nicholas V; Rabbitts, Angela C; Akkapeddi, Vijay; Cooper, Arthur; Dajer, Antonio; Delaney, Jack; Mineo, Frank P; Silber, Steven H; Soloff, Lewis; Magbitang, Kevin; Mozingo, David W

    2008-01-01

    The objective of this study was to describe a draft response plan for the tiered triage, treatment, or transportation of 400 adult and pediatric victims (50/million population) of a burn disaster for the first 3 to 5 days after injury using regional resources. Review of meeting minutes and the 11 deliverables of the draft response plan was performed. The draft burn disaster response plan developed for NYC recommended: 1) City hospitals or regional burn centers within a 60-mile distance be designated as tiered Burn Disaster Receiving Hospitals (BDRH); 2) these hospitals be divided into a four-tier system, based on clinical resources; and 3) burn care supplies be provided to Tier 3 nonburn centers. Existing burn center referral guidelines were modified into a hierarchical BDRH matrix, which would vector certain patients to local or regional burn centers for initial care until capacity is reached; the remainder would be cared for in nonburn center facilities for up to 3 to 5 days until a city, regional, or national burn bed becomes available. Interfacility triage would be coordinated by a central team. Although recommendations for patient transportation, educational initiatives for prehospital and hospital providers, city-wide, interfacility or interagency communication strategies and coordination at the State or Federal levels were outlined, future initiatives will expound on these issues. An incident resulting in critically injured burn victims exceeding the capacity of local and regional burn center beds may be a reality within any community and warrants a planned response. To address this possibility within New York City, an initial draft of a burn disaster response has been created. A scaleable plan using local, state, regional, or federal health care and governmental institutions was developed.

  8. Final Environmental Assessment for Camp Rudder Master Plan at Eglin Air Force Base, FL

    DTIC Science & Technology

    2005-06-07

    Building BMP Best Management Practices CAA Clean Air Act CEQ Council on Environmental Quality CFR Code of Federal Regulations CO Carbon Monoxide CZ...Emissions Rate SIP State Implementation Plan SO2 Sulfur Dioxide sq ft Square Feet SWPPP Stormwater Pollution Prevention Plan TCLP Toxicity...occurring mineral whose crystals form long, thin fibers . Asbestos was widely used in manufacturing in the late 1800s because of its insulating

  9. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    SciTech Connect

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  10. Wildlife and Wildlife Habitat Mitigation Plan for the Thompson Falls Hydroelectric Project, Final Report.

    SciTech Connect

    Bissell, Gael; Wood, Marilyn

    1985-08-01

    This document presents a preliminary mitigation and enhancement plan for the Thompson Falls hydroelectric project. It discusses options available to provide wildlife protection, mitigation and enhancement in accordance with the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L. 96-501). The options focus on mitigation for wildlife and wildlife habitat losses attributable to the construction of the hydroelectric project. These losses were previously estimated from the best available information concerning the degree of negative and positive impacts to target wildlife species (Wood and Olsen 1984). Criteria by which the mitigation alternatives were evaluated were the same as those used to assess the impacts identified in the Phase I document (Wood and Olsen 1984). They were also evaluated according to feasibility and cost effectiveness. This document specifically focuses on mitigation for target species which were identified during Phase I (Wood and Olsen 1984). It was assumed mitigation and enhancement for the many other target wildlife species impacted by the hydroelectric developments will occur as secondary benefits. The recommended mitigation plan includes two recommended mitigation projects: (1) development of wildlife protection and enhancement plans for MPC lands and (2) strategies to protect several large islands upstream of the Thompson Falls reservoir. If implemented, these projects would provide satisfactory mitigation for wildlife losses associated with the Thompson Falls hydroelectric project. The intent of the mitigation plan is to recommend wildlife management objectives and guidelines. The specific techniques, plans, methods and agreements would be developed is part of the implementation phase.

  11. Fees on health insurance policies and self-insured plans for the patient-centered outcomes research trust fund. Final regulations.

    PubMed

    2012-12-06

    This document contains final regulations that implement and provide guidance on the fees imposed by the Patient Protection and Affordable Care Act on issuers of certain health insurance policies and plan sponsors of certain self-insured health plans to fund the Patient-Centered Outcomes Research Trust Fund. These final regulations affect the issuers and plan sponsors that are directed to pay those fees.

  12. 76 FR 29259 - Swan Lake National Wildlife Refuge, Chariton County, MO; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... Fish and Wildlife Service Swan Lake National Wildlife Refuge, Chariton County, MO; Final Comprehensive... Significant Impact (FONSI) for the Environmental Assessment (EA) for Swan Lake National Wildlife Refuge (NWR... years. ADDRESSES: Copies of the Final CCP and FONSI/EA may be viewed at the Swan Lake National...

  13. 75 FR 44977 - General Management Plan/Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    .../Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt National Historic Sites, Hyde Park, NY... National Historic Sites, Hyde Park, NY. SUMMARY: Pursuant to National Environmental Policy Act of 1969, 42... National Historic Sites, Hyde Park, New York. The Abbreviated Final GMP/EIS includes an analysis of agency...

  14. 78 FR 54909 - Notice of Availability of the Proposed Winnemucca District Resource Management Plan and Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... threatened or endangered species habitat, watersheds, and wild horses and burros. The Proposed RMP/Final EIS... pertaining to wild horses and burros in response to the Draft RMP/Draft EIS. Substantive comments were... management of wild horses and burros. Copies of the Proposed Winnemucca District RMP/Final EIS have been...

  15. 78 FR 3910 - Hamden Slough National Wildlife Refuge, Becker County, MN; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-17

    ... National Wildlife Refuge (Refuge, NWR). In this final CCP, we describe how we intend to manage the refuge... Fish and Wildlife Service Hamden Slough National Wildlife Refuge, Becker County, MN; Final... and Wildlife Service, Interior. ACTION: Notice of availability. SUMMARY: We, the U.S. Fish and...

  16. Wildlife Protection, Mitigation, and Enhancement Plans, Anderson Ranch and Black Canyon Facilities: Final Report.

    SciTech Connect

    Meuleman, G. Allyn

    1987-06-01

    Under direction of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, and the subsequent Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, projects have been developed in Idaho to mitigate the impacts to wildlife habitat and production due to the development and operation of the Anderson Ranch and Black Canyon Facilities (i.e., dam, power plant, and reservoir areas). The Anderson Ranch Facility covered about 4812 acres of wildlife habitat while the Black Canyon Facility covered about 1115 acres. These acreages include dam and power plant staging areas. A separate mitigation plan has been developed for each facility. A modified Habitat Evaluation Procedure (HEP) was used to assess the benefits of the mitigation plans to wildlife. The interagency work group used the target species Habitat Units (HU's) lost at each facility as a guideline during the mitigation planning process, while considering the needs of wildlife in the areas. Totals of 9619 and 2238 target species HU's were estimated to be lost in the Anderson Ranch and Black Canyon Facility areas, respectively. Through a series of projects, the mitigation plans will provide benefits of 9620 target species HU's to replace Anderson Ranch wildlife impacts and benefits of 2195 target species HU's to replace Black Canyon wildlife impacts. Target species to be benefited by the Anderson Ranch and/or Black Canyon mitigation plans include the mallard, Canada goose, mink, yellow warbler, black-capped chickadee, ruffed grouse, mule deer, blue grouse, sharp-tailed grouse, ring-necked pheasant, and peregrine falcon.

  17. A Knowledge-Based Approach To Planning And Scheduling

    NASA Astrophysics Data System (ADS)

    Gilmore, John F.; Williams, D. Lamont; Thornton, Sheila

    1989-03-01

    Analyses of the shop scheduling domain indicate the objective of scheduling is the determination and satisfaction of a large number of diverse constraints. Many researchers have explored the possibilities of scheduling with the assistance of dispatching rules, algorithms, heuristics and knowledge-based systems. This paper describes the development of an experimental knowledge-based planning and scheduling system which marries traditional planning and scheduling algorithms with a knowledge-based problem solving methodology in an integrated blackboard architecture. This system embodies scheduling methods and techniques which attempt to minimize one or a combination of scheduling parameters including completion time, average completion time, lateness, tardiness, and flow time. Preliminary results utilizing a test case factory involved in part production are presented.

  18. A Sociotechnical Systems Approach To Coastal Marine Spatial Planning

    DTIC Science & Technology

    2016-12-01

    express concern over the potential impact of aquaculture operations to endangered species in the area. The company must then respond with how they...this process as containing four separate permits: a NOAA endangered species permit, a NOAA benthic habitat permit, an Office of Hawaiian Affairs... Endangered Species Office).” In this function, the company gets a list of endangered or protected species that NOAA PIRO feels need specific plans for

  19. From strategic planning to TQM: a complete management approach.

    PubMed

    Bader, S A; Braude, R M

    1995-09-01

    Organizations can no longer rely on a single management solution as they respond to a complex world. Biomedical communications managers need to employ a variety of management tools as they cope with a rapidly changing landscape and an increasing set of business pressures. This article describes two management strategies, strategic planning and total quality management, which can be used to achieve success in the 21st century.

  20. Lessons learned in systems thinking approach for evaluation planning.

    PubMed

    Williams, John C; Costich, Julia; Hacker, William D; Davis, James S

    2010-01-01

    The role of systems thinking is addressed in the context of a public health department-academic collaboration to plan the evaluation of a learning management system. Findings suggest new directions for public health practitioners and researchers who are responsible for ensuring that public health workforce training efforts, and other programs and services, have the intended impact on public health workers' competence and the public's health.

  1. Putting people on the map through an approach that integrates social data in conservation planning.

    PubMed

    Stephanson, Sheri L; Mascia, Michael B

    2014-10-01

    Conservation planning is integral to strategic and effective operations of conservation organizations. Drawing upon biological sciences, conservation planning has historically made limited use of social data. We offer an approach for integrating data on social well-being into conservation planning that captures and places into context the spatial patterns and trends in human needs and capacities. This hierarchical approach provides a nested framework for characterizing and mapping data on social well-being in 5 domains: economic well-being, health, political empowerment, education, and culture. These 5 domains each have multiple attributes; each attribute may be characterized by one or more indicators. Through existing or novel data that display spatial and temporal heterogeneity in social well-being, conservation scientists, planners, and decision makers may measure, benchmark, map, and integrate these data within conservation planning processes. Selecting indicators and integrating these data into conservation planning is an iterative, participatory process tailored to the local context and planning goals. Social well-being data complement biophysical and threat-oriented social data within conservation planning processes to inform decisions regarding where and how to conserve biodiversity, provide a structure for exploring socioecological relationships, and to foster adaptive management. Building upon existing conservation planning methods and insights from multiple disciplines, this approach to putting people on the map can readily merge with current planning practices to facilitate more rigorous decision making. © 2014 Society for Conservation Biology.

  2. Including the public in pandemic planning: a deliberative approach

    PubMed Central

    2010-01-01

    Background Against a background of pandemic threat posed by SARS and avian H5N1 influenza, this study used deliberative forums to elucidate informed community perspectives on aspects of pandemic planning. Methods Two deliberative forums were carried out with members of the South Australian community. The forums were supported by a qualitative study with adults and youths, systematic reviews of the literature and the involvement of an extended group of academic experts and policy makers. The forum discussions were recorded with simultaneous transcription and analysed thematically. Results Participants allocated scarce resources of antiviral drugs and pandemic vaccine based on a desire to preserve society function in a time of crisis. Participants were divided on the acceptability of social distancing and quarantine measures. However, should such measures be adopted, they thought that reasonable financial, household and psychological support was essential. In addition, provided such support was present, the participants, in general, were willing to impose strict sanctions on those who violated quarantine and social distancing measures. Conclusions The recommendations from the forums suggest that the implementation of pandemic plans in a severe pandemic will be challenging, but not impossible. Implementation may be more successful if the public is engaged in pandemic planning before a pandemic, effective communication of key points is practiced before and during a pandemic and if judicious use is made of supportive measures to assist those in quarantine or affected by social isolation measures. PMID:20718996

  3. A Strategic Planning Approach to Technology Integration: Critical Success Factors.

    ERIC Educational Resources Information Center

    Shaw, Sam; Zabudsky, Jeff

    Within most institutions of higher learning, the typical approach to the integration of new information and communications technologies into the teaching and learning process has involved a heavy reliance on early adopters. This path of least resistance approach has provided organizations with the opportunity to quickly claim a presence in the…

  4. Learning Outcomes in Vocational Education: A Business Plan Development by Production-Based Learning Model Approach

    ERIC Educational Resources Information Center

    Kusumaningrum, Indrati; Hidayat, Hendra; Ganefri; Anori, Sartika; Dewy, Mega Silfia

    2016-01-01

    This article describes the development of a business plan by using production-based learning approach. In addition, this development also aims to maximize learning outcomes in vocational education. Preliminary analysis of curriculum and learning and the needs of the market and society become the basic for business plan development. To produce a…

  5. An Information-Theoretic-based Evolutionary Approach for the Dynamic Search Path Planning Problem

    DTIC Science & Technology

    2014-05-01

    action outcomes/observations as exogenous events, to timely adjust search path plans using coevolution . The approach takes advantage of objective...an information-theoretic framework. Path planning ultimately results from the coevolution of two populations of “plan” individuals describing a

  6. A Multifaceted Approach to Investigating Pre-Task Planning Effects on Paired Oral Test Performance

    ERIC Educational Resources Information Center

    Nitta, Ryo; Nakatsuhara, Fumiyo

    2014-01-01

    Despite the growing popularity of paired format speaking assessments, the effects of pre-task planning time on performance in these formats are not yet well understood. For example, some studies have revealed the benefits of planning but others have not. Using a multifaceted approach including analysis of the process of speaking performance, the…

  7. Do Rural and Suburban Principals Approach Planning Differently? A Two-State Comparison.

    ERIC Educational Resources Information Center

    Howley, Craig; Howley, Aimee; Larson, Bill

    A survey of rural and suburban principals in Ohio and West Virginia explored the different approaches to planning that principals take and examined two possible contextual influences: rural versus suburban locale, and state. A survey instrument based on five types of planning discussed in the literature was completed by 207 West Virginia…

  8. Developing a Collegial Approach to Integrated Planning at a Small College: Communication, Understanding, and Cooperation.

    ERIC Educational Resources Information Center

    Farmer, D. W.

    1983-01-01

    An effective collegial and relatively noncompetitive approach to integrated planning developed at King's College is discussed. The development of a structured system of intensive oral communication; an organizational design integrating planning, budgeting, marketing, and evaluation, and a modified matrix management system are described. (MLW)

  9. Final Report for Harvesting a New Wind Crop: Innovative Economic Approaches for Rural America

    SciTech Connect

    Susan Innis; Randy Udall; Project Officer - Keith Bennett

    2005-09-30

    Final Report for ''Harvesting a New Wind Crop: Innovative Economic Approaches for Rural America'': This project, ''Harvesting a New Wind Crop'', helped stimulate wind development by rural electric cooperatives and municipal utilities in Colorado. To date most of the wind power development in the United States has been driven by large investor-owned utilities serving major metropolitan areas. To meet the 5% by 2020 goal of the Wind Powering America program the 2,000 municipal and 900 rural electric cooperatives in the country must get involved in wind power development. Public power typically serves rural and suburban areas and can play a role in revitalizing communities by tapping into the economic development potential of wind power. One barrier to the involvement of public power in wind development has been the perception that wind power is more expensive than other generation sources. This project focused on two ways to reduce the costs of wind power to make it more attractive to public power entities. The first way was to develop a revenue stream from the sale of green tags. By selling green tags to entities that voluntarily support wind power, rural coops and munis can effectively reduce their cost of wind power. Western Resource Advocates (WRA) and the Community Office for Resource Efficiency (CORE) worked with Lamar Light and Power and Arkansas River Power Authority to develop a strategy to use green tags to help finance their wind project. These utilities are now selling their green tags to Community Energy, Inc., an independent for-profit marketer who in turn sells the tags to consumers around Colorado. The Lamar tags allow the University of Colorado-Boulder, the City of Boulder, NREL and other businesses to support wind power development and make the claim that they are ''wind-powered''. This urban-rural partnership is an important development for the state of Colorado's rural communities get the economic benefits of wind power and urban businesses are

  10. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  11. Analysis of local planning interviews. Final report, September 1983-April 1984

    SciTech Connect

    Wittenberg, C.A.; Parham, P.J.

    1984-04-01

    This report provides the reader with an insight on information collected and applied through the interview process developing state and local Emergency Operations Plans over a seven-year period within FEMA's Region X. The report will show the transition from Nuclear Civil Protection (Crisis Relocation) plans to Integrated Emergency Management plans. The contractor conducted over 200 interviews of private, public, and quasi-public agencies. This document takes the cumulative information from the interviews and categorizes it according to functional areas and by public or provide sector. The interviews documented in the report show the change in emergency management over the past seven years. This change can be attributed to (1) an increased emphasis on all-hazard planning, (2) younger, more aggressive and qualified directors with planning and management backgrounds, (3) the upgrading of the position of Emergency Manager to department status, (4) increased involvement of public safety agencies such as police and fire, (5) better public information and awareness, (6) better training programs and materials through FEMA, and (7) more recruitment and involvement of the private sector and volunteer agencies.

  12. Wildlife Protection, Mitigation, and Enhancement Planning Phase II, Dworshak Reservoir, Final Report.

    SciTech Connect

    Hansen, H. Jerome; Martin, Robert C.

    1989-11-01

    The Pacific Northwest Electric Power Planning and Conservation Act of 1980 directed that measures be implemented to protect, mitigate, and enhance fish and wildlife to the extent affected by development and operation of hydropower projects on the Columbia River System. This Act created the Northwest Power Planning Council, which in turn developed the Columbia River Basin Fish and Wildlife Program. This program established a four-part process: wildlife mitigation status reports; wildlife impact assessments; wildlife protection, mitigation, and enhancement plans; and implementation of protection, mitigation, and enhancement projects. This mitigation plan for the Dworshak Reservoir Hydroelectric Facility was developed to fulfill requirements of Sections 1003(b)(2) and (3) of the Columbia River Basin Fish and Wildlife Program. Specific objectives of wildlife protection, mitigation, and enhancement planning for Dworshak Reservoir included: quantify net impacts to target wildlife species affected by hydroelectric development and operation of Dworshak Dam and Reservoir; develop protection, mitigation, and enhancement goals and objectives for the target wildlife species; recommend protection, mitigation, and enhancement actions for the target wildlife species; and coordination of project activities. 46 refs., 4 figs., 31 tabs.

  13. Patient protection and Affordable Care Act; data collection to support standards related to essential health benefits; recognition of entities for the accreditation of qualified health plans. Final rule.

    PubMed

    2012-07-20

    This final rule establishes data collection standards necessary to implement aspects of section 1302 of the Patient Protection and Affordable Care Act (Affordable Care Act), which directs the Secretary of Health and Human Services to define essential health benefits. This final rule outlines the data on applicable plans to be collected from certain issuers to support the definition of essential health benefits. This final rule also establishes a process for the recognition of accrediting entities for purposes of certification of qualified health plans.

  14. Basewide energy systems plan, Fort McClellan, Alabama. Executive summary. Final report

    SciTech Connect

    1982-11-01

    This is a summary of the results for Increments A, B, C, D and E of the Basewide Energy Systems Plan for Fort McClellan, Alabama. (The results of Increments F and G are summarized on pages 5 and 6). This plan includes analyses and recommendations of energy conservation projects for reduction of the installation`s present energy consumption. The installation should be aware that savings figures presented in this summary can only be realized after all projects have been implemented. Black Veatch has developed projects that would meet the funding requirements for the energy conservation program. Furthermore, the recommended projects provide partial compliance with the energy conservation requirement for the installation as outlined in the Army Facilities Energy Plan.

  15. Study of the planned N.E. Pacific Street HOV facility. Final report

    SciTech Connect

    Nihan, N.L.

    1992-06-01

    This report presents an analysis of HOV improvements for two signalized arterials in the Seattle metropolitan area. The first involves a planned 1,000 foot queue jumper lane on NE Pacific St. in the University District of Seattle. This planned improvement was studied prior to its implementation in Spring of 1990. As part of this study, an extensive before-data set was developed. The planned improvement in now in place, and an extensive after-study is now in progress as part of a follow-up project. The second study was more of a feasibility analysis of possible HOV improvements for a suburan arterial. Specifically, NE 85/Redmond Way, a 2.5 mile stretch of arterial for Interstate 405 in Kirkland to Willows Road in Redmond, was identified as one of the highest priority arterials to be considered for HOV improvements.

  16. Electric utility system planning studies for OTEC power integration. Final report

    SciTech Connect

    1980-11-30

    Florida Power Corporation (FPC) conducted an evaluation of the possible integration of OTEC into the FPC system. Existing system planning procedures, assumptions, and corporate financial criteria for planning new generating capacity were used without modification. A baseline configuration for an OTEC plant was developed for review with standard planning procedures. The OTEC plant characteristics and costs were incorporated in considerable detail. These basic inputs were examined using the FPC system planning methods. It was found that with the initial set of conditions, OTEC would not be economically viable. Using the same system planning procedures, a number of adjustments were made to the key study assumptions. It was found that two considerations dominate the analysis; the assumed rate of fuel cost escalation, and the projected capital cost of the OTEC plant. The analysis produced a parametric curve: on one hand, if fuel costs were to escalate at a rate greater than assumed (12% vs the assumed 5% for coal), and if no change were made to the OTEC input assumptions, the basic economic competitive criteria would be equivalent to the principal alternative, coal fueled plants. Conversely, if the projected cost of the OTEC plant were to be reduced from the assumed $2256/kW to $1450/kW, the economic competitiveness criterion would be satisfied. After corporate financial analysis, it was found that even if the cost competitive criterion were to be reached, the plan including OTEC could not be financed by Florida Power Corporation. Since, under the existing set of conditions for financing new plant capital requirements, FPC could not construct an OTEC plant, some other means of ownership would be necessary to integrate OTEC into the FPC system. An alternative such as a third party owning the plant and selling power to FPC, might prove attractive. (WHK)

  17. Comprehensive Plan for Rehabilitation of Anadromous Fish Stocks in the Umatilla River Basin, 1985 Final Report.

    SciTech Connect

    Boyce, Raymond R.

    1986-01-01

    The goals of the project were to: establish fishery rehabilitation objectives for naturally and hatchery produced salmonids in the Umatilla Basin; estimate potential benefits of each of the rehabilitation and flow enhancement projects to naturally and hatchery produced salmonids; and develop a plan to set priorities, implement, and evaluate projects that will achieve rehabilitation objectives. This document identifies fishery needs, quantifies the contribution of proposed fishery projects under present and enhanced flows, provides cost estimates for projects, and provides a plan for prioritization, implementation, and evaluation of projects.

  18. Kansas DOE/EPSCoR planning and traineeship grants: Final progress report

    SciTech Connect

    1997-05-01

    In 1991, Kansas became the 18th state eligible for EPSCoR support, and it responded quickly to calls for planning proposals from DOE, NSF, and EPA. Planning process was carried out to improve the quality of scientific and engineering R&D in Kansas. All programs attempt to strengthen the intra- and inter-institutional ties to develop a critical mass of researchers in several areas. The following areas of excellence were selected for DOE/EPSCoR traineeships: atomic processes, electric power production, petroleum, high-energy physics, and energy alternative and efficiency.

  19. FINAL DISPOSAL OF RADIOACTIVE WASTE IN GERMANY: PLAN APPROVAL PROCESS OF KONRAD MINE AND ACCEPTANCE REQUIREMENTS

    SciTech Connect

    Bandt, Gabriele; Posnatzki, Britta; Beckers, Klaus-Arno

    2003-02-27

    Currently no final repository for any type of radioactive waste is operated in Germany. Preliminary Final Storage Acceptance Requirements for radioactive waste packages were published in 1995. Up to now these are the basis for treatment of radioactive waste in Germany. After licensing of the final repository these preliminary waste acceptance requirements are completed with licensing conditions. Some of these conditions affect the preliminary waste acceptance requirements, e. g. behavior of chemo-toxic substances in case of accidents in the final repository or the allowed maximum concentration of fissile material. The presented examples of radioactive waste conditioning campaigns demonstrate that no difficulties are expected in management, characterization and quality assurance of radioactive wastes due to the licensing conditions.

  20. 78 FR 23586 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... advising the public of the availability of the Final Environmental Impact Statement (FEIS) associated with... bat (Myotis sodalis) from construction, operation, maintenance, and decommissioning associated with... from the Ecological Services Office in the Midwest Regional Office (see FOR FURTHER INFORMATION...

  1. A Knowledge-Based Approach to Improving and Homogenizing Intensity Modulated Radiation Therapy Planning Quality Among Treatment Centers: An Example Application to Prostate Cancer Planning

    SciTech Connect

    Good, David; Lo, Joseph; Lee, W. Robert; Wu, Q. Jackie; Yin, Fang-Fang; Das, Shiva K.

    2013-09-01

    Purpose: Intensity modulated radiation therapy (IMRT) treatment planning can have wide variation among different treatment centers. We propose a system to leverage the IMRT planning experience of larger institutions to automatically create high-quality plans for outside clinics. We explore feasibility by generating plans for patient datasets from an outside institution by adapting plans from our institution. Methods and Materials: A knowledge database was created from 132 IMRT treatment plans for prostate cancer at our institution. The outside institution, a community hospital, provided the datasets for 55 prostate cancer cases, including their original treatment plans. For each “query” case from the outside institution, a similar “match” case was identified in the knowledge database, and the match case’s plan parameters were then adapted and optimized to the query case by use of a semiautomated approach that required no expert planning knowledge. The plans generated with this knowledge-based approach were compared with the original treatment plans at several dose cutpoints. Results: Compared with the original plan, the knowledge-based plan had a significantly more homogeneous dose to the planning target volume and a significantly lower maximum dose. The volumes of the rectum, bladder, and femoral heads above all cutpoints were nominally lower for the knowledge-based plan; the reductions were significantly lower for the rectum. In 40% of cases, the knowledge-based plan had overall superior (lower) dose–volume histograms for rectum and bladder; in 54% of cases, the comparison was equivocal; in 6% of cases, the knowledge-based plan was inferior for both bladder and rectum. Conclusions: Knowledge-based planning was superior or equivalent to the original plan in 95% of cases. The knowledge-based approach shows promise for homogenizing plan quality by transferring planning expertise from more experienced to less experienced institutions.

  2. Formulation of consumables management models. Development approach for the mission planning processor working model

    NASA Technical Reports Server (NTRS)

    Connelly, L. C.

    1977-01-01

    The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.

  3. Planning for a Performance-Based Teacher Education Program: A Final Report.

    ERIC Educational Resources Information Center

    Dickson, George E.; And Others

    During 1971-72, the College of Education of the University of Toledo undertook the planning for the revision of the entire undergraduate teacher education program in the areas of secondary and elementary education. It was decided that the program should be performance based and interdisciplinary and should unite the urban educational institutions…

  4. 77 FR 35999 - Notice of Availability of the Proposed Resource Management Plan/Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... new guidance. BLM received many comments regarding recreational target shooting that were both opposed to, and in favor of closure of the Monument to target shooting. Alternative E (the Proposed Plan) was revised to allow the Monument to remain open to recreational target shooting consistent with the No...

  5. 78 FR 4430 - Chassahowitzka National Wildlife Refuge, FL; Final Comprehensive Conservation Plan and Finding of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Service, Planning and Compliance Division, Southeast Region; U.S. Geological Survey; Florida Fish and... officer, the volunteer coordinator, and the biological and computer-mapping technicians, will allow for greater resource study, mapping, data analysis, and enforcement. The hiring of a wildlife specialist and...

  6. Professional Development Planning Study. Fiscal Year 1974 and 1975, Final Report.

    ERIC Educational Resources Information Center

    Breen, John; And Others

    A two-year project to systematize the occupational teacher approval record-keeping and planning procedures for the Massachusetts Office of Professional Development (OPD) for the Division of Occupational Education is described. A project overview discusses the problems of the system and objectives arrived at to solve them, including the improvement…

  7. A College Marketing Plan That's Working: Final Report. CASE Certification Program in Executive Management.

    ERIC Educational Resources Information Center

    Noll, Gayle

    In response to a 3% decline in fall 1977 enrollments, Odessa College developed and implemented a comprehensive marketing program. After initial planning, a marketing task force and nine mini-task forces were created to deal with the topics of community economic markets, community cultural markets, student retention, student recruitment techniques,…

  8. 76 FR 60525 - Final Wilderness and Backcountry Management Plan and Environmental Impact Statement for Isle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Water Zones. This Plan/EIS addresses a wide array of management issues, and identifies specific goals... multiple alternatives for goals and management actions, which were developed with extensive public input... intention of creating one cohesive management program, with management goals for each of several...

  9. Final Pantex Report - 2006 [Phase 1 plan for assessment of Former Workers at the Pantex Facility

    SciTech Connect

    Abdo, Ronna

    2013-07-18

    The purpose of this project was to develop a Phase 1 plan for assessment of Former Workers at the Pantex Facility in Amarillo, TX and to determine the suitability to start a medical surveillance program among former workers for this site.

  10. The Generic Skills Subcommittee Final Report to the Academic Plan Steering Committee. General Education Task Force.

    ERIC Educational Resources Information Center

    George Brown Coll., Toronto (Ontario).

    Ontario's College Standards and Accreditation Council (CSAC) devised a plan to enhance three dimensions of college education: general education, generic skills; and vocational or professional education. The CSAC designates generic skills as practical life skills essential for both personal and career success, defining these practical, portable…

  11. Joint Public-Parochial Planning Councils. Final Report 1975-1976. Report No. 7702.

    ERIC Educational Resources Information Center

    Philadelphia School District, PA. Office of Research and Evaluation.

    This report briefly describes Philadelphia's Joint Public Parochial Planning Councils (JPC) project and presents an evaluation of the project's impact during the 1975-76 school year. The JPC project is intended to provide sustained interaction between the Philadelphia School District and the Archdiocese of Philadelphia. During 1975-76, 102 joint…

  12. Development of State Plan for Career Education in Alabama. Final Report.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Education, Montgomery.

    This state plan for career education in Alabama describes the first-year objectives and operational procedures of the State Advisory Council for Career Education. Activities of the following six task forces are reported: (1) needs assessment for grades K-12, (2) postsecondary needs assessment, (3) noneducational (business and industry) needs…

  13. A Computer Simulation Modeling Tool to Assist Colleges in Long-Range Planning. Final Report.

    ERIC Educational Resources Information Center

    Salmon, Richard; And Others

    Long-range planning involves the establishment of educational objectives within a rational philosophy, the design of activities and programs to meet stated objectives, the organization and allocation of resources to implement programs, and the analysis of results in terms of the objectives. Current trends of educational growth and complexity…

  14. 75 FR 9924 - Final Comprehensive Conservation Plan for the Red Rock Lakes National Wildlife Refuge, MT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... and seasons. The draft Plan and Environmental Assessment (EA) was made available to the public for... Environmental Assessment identified and evaluated four alternatives for managing the refuge for the next 15... functioning ecological communities on the refuge. However, changes to the landscape (e.g., human alterations...

  15. EVALUATION CONFERENCE ON LEADERSHIP DEVELOPMENT SEMINARS, PROGRAM PLANNING, BUDGETING AND EVALUATION. FINAL REPORT.

    ERIC Educational Resources Information Center

    HIMMELE, IRVIN H.; SMITH, CLODUS R.

    THIRTY-FOUR PARTICIPANTS REPRESENTING THE LEADERSHIP-ACTION LEVEL OF PERSONNEL THROUGHOUT THE NATION AND FROM THE U.S. OFFICE OF EDUCATION EVALUATED THE LEADERSHIP DEVELOPMENT AND PROGRAM PLANNING, AND BUDGETING SEMINARS HELD DURING 1967. GUIDELINES FOR SEMINAR EVALUATION WERE PRESENTED--(1) "RATIONALE AND RETROSPECT" BY N. EDWIN CRAWFORD, (2)…

  16. 77 FR 37432 - Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ...'' law) (42 U.S.C. 9601 et seq.) and the Federal Water Pollution Control Act (commonly known as the Clean Water Act (CWA)) (33 U.S.C. 1251 et seq.) authorize States, federally recognized tribes, and certain... subpart G of the National Oil and Hazardous Substances Pollution Contingency Plan (40 CFR 300.600 and 300...

  17. 75 FR 22737 - Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... (CERCLA), 42 U.S.C. 9607(f), Section 311 of the Federal Water Pollution and Control Act (FWPCA), 33 U.S.C. 1321, Subpart G of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), 40 CFR... Remedial Investigation (RI) of contaminants in sediments, surface water, and biota in the Calcasieu Estuary...

  18. Hydrazine Blending and Storage Facility, Interim Response Action Implementation. Final Safety Plan

    DTIC Science & Technology

    1989-08-30

    functions , capabilities, and limitations of respirators; donning and fit testing ; proper wearing; and maintenance. If necessary, training will be...buildup of microscopic asbestos fibers. The scarring causes decrk ased pulmonary function , leading to a number of secondary complications, and...at RMA. Phase I includes planning, wastewater treatment system selection and modification (including bench/pilot-scale testing ), full-scale system

  19. Roads to the Future: Strategic Plan for Education Options in the 21st Century. Final Report.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento.

    This document presents the recommendations of a special Advisory Committee on Educational Options, which was charged with developing a strategic plan for educational options in California. This working document is intended to set broad goals and program directions for meeting the future needs of California's youth. The introductory section…

  20. Manpower Information for Vocational Education Planning. Final Report. Leadership Series No. 21.

    ERIC Educational Resources Information Center

    Young, Robert C., Ed.

    Twenty-three participants attended a conference with a major objective of providing insight into techniques of forecasting, new kinds of data being generated by the Department of Labor and others, and the difficulties and possible resolution of problems in utilizing data in the vocational education planning process. Major presentations were: (1)…

  1. Preserving the Collections of Joyner Library: The Preservation Planning Program. Final Report.

    ERIC Educational Resources Information Center

    Smith, Elizabeth H.; Barbour, Gordon; Cotter, Michael; Goering, Lawrence

    This report is structured to educate East Carolina University about library materials preservation. The library-wide preservation program began at Joyner Library in 1993 with the organization of the Preservation and Conservation Department. The planning phase of the preservation program began in 1995 with the appointment of the…

  2. Program Planning is the Name of the Game. Final Report, First Year Project CLASP.

    ERIC Educational Resources Information Center

    Weaver, Barbara F.

    Central Massachusetts Library Administration Simulation Project (CLASP) was a research project funded under Title II-B to develop and test a simulation model that would enable public library personnel to learn and practice skills of negotiation, decision making, budgeting, and program planning. A simulation model was developed and tested in a…

  3. Project for Developing Program Planning-Budgeting-Evaluation System. Final Report.

    ERIC Educational Resources Information Center

    Earhart, J. Troy

    The materials in the document report on the development of a program planning budgeting evaluating system in the Dade County, Florida, public schools. Materials cover the development and design of the system from its inception and implementation in the winter and spring of 1971. The project chronology and the program structure and the management…

  4. Planned and Unplanned Aspects of Occupational Choices by Youth. Final Report.

    ERIC Educational Resources Information Center

    Ellis, Robert A.; And Others

    This document includes reports on four subjects relevant to planned and unplanned aspects of occupational choices by youth. (1) "Toward a Morphology of Occupational Choice," by Robert A. Ellis and others, discusses intrinsic features and extrinsic rewards of work, extra-role considerations, and goal perception as major influences on occupational…

  5. Proposed Center for Research on Teacher Education. NIE Planning Grant, Final Performance Report.

    ERIC Educational Resources Information Center

    Schwartz, Henrietta; And Others

    This report describes plans for implementing a proposed center for research on teacher education. The proposal for the Center was a collaborative effort involving the 19 campuses of the California State University System to develop a national base for research on teacher education. The first section describes briefly the efforts undertaken to…

  6. A Third-Party Evaluation to Assess the Impact of the Quality Assistance Plan. Final Report.

    ERIC Educational Resources Information Center

    McCormick, Fred C.; McCormick, Eileen R.

    In 1984, the State Board of Education, Department of Adult, Vocational, and Technical Education (DAVTE), contracted with an outside evaluator to assess the impact of the Illinois Quality Assistance Plan (QAP). (The QAP is a state-funded program for locally initiated, developed, implemented, and evaluated projects that was begun in Fiscal Year…

  7. An Evaluation of the Plan To Revise Special Education in New Jersey. Final Report.

    ERIC Educational Resources Information Center

    Joy, Myra F.; And Others

    In response to the recommendations of the New Jersey Special Education Study Commission and input from parents, educators, and the general public, the New Jersey Department of Education's Division of Special Education developed "A Plan To Revise Special Education in New Jersey" (1986), commonly called P2R. P2R calls for changes in the…

  8. Development of a Convergence Plan for Vocational Education in Wisconsin. Final Report.

    ERIC Educational Resources Information Center

    Nelson, Orville

    To determine if the Convergence Planning Technique, designed to identify research components and organize them in a logical manner on a matrix for analysis, could be applied to vocational education problems in Wisconsin, questionnaires composed of problems identified through literature reviews and interviews were distributed to vocational,…

  9. Development of Plans for Providing Public Telecommunications Services for the City of Columbus, Ohio. Final Report.

    ERIC Educational Resources Information Center

    Levy, Girard W.; Bloch, Carl J.

    This report presents the requirements and plans for providing public telecommunications services for the city of Columbus. Included are a description and analysis of potential applications of public telecommunications services in the community; the design requirements and system specifications for a two-way cable interconnect linking a government…

  10. A Final Report of the Brownsville Community Council's Advocacy Planning Unit.

    ERIC Educational Resources Information Center

    Elsbery, James W.

    The primary purpose of this analysis is to report on the application of a form of advocacy planning in an inner-city community and then determine how much of what has been learned is relevant to other urban settings that need sociopolitical change. The Brownsville Community Council is one of 26 community development corporations created throughout…

  11. Ecology of Greater Sage-Grouse in the Bi-State Planning Area Final Report, September 2007

    USGS Publications Warehouse

    Casazza, Michael L.; Overton, Cory T.; Farinha, Melissa A.; Torregrosa, Alicia; Fleskes, Joseph P.; Miller, Michael R.; Sedinger, James S.; Kolada, Eric J.

    2009-01-01

    completed in 2004 and 2005 addressed each of the specific objectives and this final report focuses on the biological information gathered in support of local conservation efforts. Participation in the development of the Bi-State Local Area Conservation Plan was accomplished on multiple scales. Beginning in the fall of 2002, USGS personnel began participating in meetings of local stakeholders involved in the development of a sage-grouse conservation plan for the Bi-State planning area. This included attendance at numerous local PMU group meetings and field trips as well as participating on the technical advisory committee (TAC) for the Bi-State group. Whenever appropriate, ongoing results and findings regarding sage-grouse ecology in the local area were incorporated into these working group meetings. In addition, the USGS partnered with CDFG to help reorganize one of the local PMU groups (South Mono) and edited that portion of the Bi-State plan. The USGS also worked closely with CDFG to draft a description of the state of knowledge for sage-grouse genetic information for inclusion in the Bi-State Conservation Plan. The first edition of the Bi-State Conservation Plan for Greater Sage-Grouse was completed in June 2004 (Bi-State Sage-grouse Conservation Team 2004). This report is organized primarily by PMU to facilitate the incorporation of these research findings into the individual PMU plans that compose the Bi-State plan. Information presented in this report was derived from over 7,000 radio-telemetry locations obtained on 145 individual sage-grouse during a three year period (2003-2005). In addition, we collected detailed vegetation measurements at over 590 habitat sampling plots within the study area including canopy cover, shrubs, forbs, and grasses diversity. Vegetation data collection focused on sage-grouse nests, and brood-use areas. Additionally we collected data at random sites to examine sage-grouse habitat relationships within the study area. The majori

  12. Final work plan : investigation of potential contamination at the former USDA facility in Ramona, Kansas.

    SciTech Connect

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.

  13. A 3-Component Approach Incorporating Focus Groups in Strategic Planning for Sexual Violence Prevention.

    PubMed

    Cruz, Theresa H; Hess, Julia Meredith; Woelk, Leona; Bear, Samantha

    2016-01-01

    Sexual violence is of special concern in New Mexico because of the presence of large priority populations in which its prevalence is high. This article describes a 3-component approach to developing a strategic plan to prevent sexual violence in the state that consisted of an advisory group, subject matter experts, and focus groups from geographically and demographically diverse communities. Both common and community-specific themes emerged from the focus groups and were included in the strategic plan. By incorporating community needs and experiences, this approach fosters increased investment in plan implementation.

  14. A graph-based ant colony optimization approach for process planning.

    PubMed

    Wang, JinFeng; Fan, XiaoLiang; Wan, Shuting

    2014-01-01

    The complex process planning problem is modeled as a combinatorial optimization problem with constraints in this paper. An ant colony optimization (ACO) approach has been developed to deal with process planning problem by simultaneously considering activities such as sequencing operations, selecting manufacturing resources, and determining setup plans to achieve the optimal process plan. A weighted directed graph is conducted to describe the operations, precedence constraints between operations, and the possible visited path between operation nodes. A representation of process plan is described based on the weighted directed graph. Ant colony goes through the necessary nodes on the graph to achieve the optimal solution with the objective of minimizing total production costs (TPC). Two cases have been carried out to study the influence of various parameters of ACO on the system performance. Extensive comparative experiments have been conducted to demonstrate the feasibility and efficiency of the proposed approach.

  15. Design and evaluation of an air traffic control Final Approach Spacing Tool

    NASA Technical Reports Server (NTRS)

    Davis, Thomas J.; Erzberger, Heinz; Green, Steven M.; Nedell, William

    1991-01-01

    This paper describes the design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arriving aircraft as well as sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a four-dimensional trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST has been implemented on a high-performance workstation. It can be operated as a stand-alone in the terminal radar approach control facility or as an element of a system integrated with automation tools in the air route traffic control center. FAST was evaluated by experienced air traffic controllers in a real-time air traffic control simulation. simulation results summarized in the paper show that the automation tools significantly reduced controller work load and demonstrated a potential for an increase in landing rate.

  16. Design and evaluation of an air traffic control Final Approach Spacing Tool

    NASA Technical Reports Server (NTRS)

    Davis, Thomas J.; Erzberger, Heinz; Green, Steven M.; Nedell, William

    1991-01-01

    This paper describes the design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arriving aircraft as well as sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a four-dimensional trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST has been implemented on a high-performance workstation. It can be operated as a stand-alone in the terminal radar approach control facility or as an element of a system integrated with automation tools in the air route traffic control center. FAST was evaluated by experienced air traffic controllers in a real-time air traffic control simulation. simulation results summarized in the paper show that the automation tools significantly reduced controller work load and demonstrated a potential for an increase in landing rate.

  17. A moment-based approach for DVH-guided radiotherapy treatment plan optimization

    NASA Astrophysics Data System (ADS)

    Zarepisheh, M.; Shakourifar, M.; Trigila, G.; Ghomi, P. S.; Couzens, S.; Abebe, A.; Noreña, L.; Shang, W.; Jiang, Steve B.; Zinchenko, Y.

    2013-03-01

    The dose-volume histogram (DVH) is a clinically relevant criterion to evaluate the quality of a treatment plan. It is hence desirable to incorporate DVH constraints into treatment plan optimization for intensity modulated radiation therapy. Yet, the direct inclusion of the DVH constraints into a treatment plan optimization model typically leads to great computational difficulties due to the non-convex nature of these constraints. To overcome this critical limitation, we propose a new convex-moment-based optimization approach. Our main idea is to replace the non-convex DVH constraints by a set of convex moment constraints. In turn, the proposed approach is able to generate a Pareto-optimal plan whose DVHs are close to, or if possible even outperform, the desired DVHs. In particular, our experiment on a prostate cancer patient case demonstrates the effectiveness of this approach by employing two and three moment formulations to approximate the desired DVHs.

  18. A sensitive approach to family planning motivation in Malaysia.

    PubMed

    1978-01-01

    The goals of the Malaysian Family Planning Program are not only to reduce population growth from 3% to 2% by 1985 and to bring the crude birth rate to 28.2 from 30.3, but to generally improve the health of the family, and to enhance the government's efforts to raise the per capita income. The work program is divided into the Creative Unit, the Media Unit, the Production Unit, and the Field Diffusion Unit. The objectives are to build up strong support from political, community, and opinion leaders, and to run educational campaigns aimed at motivating potential acceptors. The program also runs centers training medical and paramedical personnel. The program is combined with development programs for women, especially useful among the rural population.

  19. A scenario planning approach for disasters on Swiss road network

    NASA Astrophysics Data System (ADS)

    Mendes, G. A.; Axhausen, K. W.; Andrade, J. S.; Herrmann, H. J.

    2014-05-01

    We study a vehicular traffic scenario on Swiss roads in an emergency situation, calculating how sequentially roads block due to excessive traffic load until global collapse (gridlock) occurs and in this way displays the fragilities of the system. We used a database from Bundesamt für Raumentwicklung which contains length and maximum allowed speed of all roads in Switzerland. The present work could be interesting for government agencies in planning and managing for emergency logistics for a country or a big city. The model used to generate the flux on the Swiss road network was proposed by Mendes et al. [Physica A 391, 362 (2012)]. It is based on the conservation of the number of vehicles and allows for an easy and fast way to follow the formation of traffic jams in large systems. We also analyze the difference between a nonlinear and a linear model and the distribution of fluxes on the Swiss road.

  20. Cost allocation plans for public assistance programs--Health and Human Services Department. Interim final rule with comment period.

    PubMed

    1982-04-23

    This rule revises existing regulations concerning the preparation, submission and approval of State agency cost allocation plans used in computing claims for Federal Financial Participation under public assistance programs. It also reflects the transfer of responsibility for review and approval of the plans to the Division of Cost Allocation (DCA) in the Department's regional offices. This responsibility was previously assigned to the Social and Rehabilitation Service which was abolished by Secretarial Order published on March 9, 1977 (42 FR 13262). The current rule has been rewritten so that it is clearer, easier to understand and more specific. The Department's Informal Grant Appeals regulation relative to cost allocation plans and indirect cost rates (45 CFR Part 75) is also being updated and revised to make it consistent with Supart E, Cost allocation plans, of 45 CFR Part 95, General administration--grant programs (public assistance and medical assistance). Although these regulations are final, the Department has decided to invite public comments for the reasons described in the Supplementary Information below. Comments may be submitted in the manner described below. If changes are needed as a result of the comments received, those changes will be published in the Federal Register along with the comments received and the Department's responses to those comments.