Sample records for planning designing constructing

  1. SCHOOLS OF PRESTRESSED CONCRETE. PLANNING, DESIGN AND CONSTRUCTION OF EDUCATIONAL FACILITIES FOR SCHOOLS AND COLLEGES.

    ERIC Educational Resources Information Center

    LYMAN, ROBERT J.

    THE USE OF PRESTRESSED CONCRETE IS EMPHASIZED IN THE AREAS OF SCHOOL PLANNING, DESIGN, AND CONSTRUCTION. THE PLANNING SECTION INCLUDES--(1) ROLES OF ACTIVE PARTIES AND RELATED ORGANIZATIONS, (2) PROCEDURES, AND (3) CONCEPTUAL DATA FOR SITE AND BUILDING. THE DESIGN SECTION CONTAINS--(1) DEVELOPMENT OF CONSTRUCTION SYSTEMS, (2) INTEGRATION OF…

  2. Principles of Good School Building Design. School Buildings Planning, Design, and Construction Series No. 3.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on school building design issues, such as the fundamentals of good design and designs that accommodate change, issues affecting…

  3. Standard road plans [English version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed : to show standardized design features, construction methods and approved : materials to be used in design plans for Interstate, Primary, and Secondary : road construction in th...

  4. Standard road plans : metric [version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed : to show standardized design features, construction methods and approved : materials to be used in design plans for Interstate, Primary, and Secondary : road construction in th...

  5. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  6. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  7. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  8. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  9. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  10. MDOT implementation plan for GPS technology in planning, design, and construction delivery

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  11. Standard road plans index sheets [English version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed to show standardized design features, construction methods and approved materials to be used in design plans for Interstate, Primary, and Secondary road construction in the Stat...

  12. Standard road plans index sheets [metric version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed to show standardized design features, construction methods and approved materials to be used in design plans for Interstate, Primary, and Secondary road construction in the Stat...

  13. MDOT implementation plan for global positioning systems (GPS) technology in planning, design, and construction delivery.

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  14. 29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...

  15. 29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...

  16. 29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...

  17. Purpose Designed Facilities. School Buildings Planning, Design, and Construction Series No. 4.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on issues involving school space design and the kinds of spaces required in schools, including lecture spaces and seminar rooms,…

  18. 4D modeling in high-rise construction

    NASA Astrophysics Data System (ADS)

    Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly

    2018-03-01

    High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  19. 25 CFR 170.415 - What is pre-project planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range... sources and identification of other funding sources to expedite the planning, design, and construction of...

  20. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  1. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  2. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  3. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  4. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  5. Planning and evaluation parameters for offshore complexes

    NASA Technical Reports Server (NTRS)

    Sincoff, M. Z. (Editor); Dajani, J. S. (Editor)

    1976-01-01

    Issues are presented for consideration in the planning and design of offshore artificial complexes. The construction of such complexes, their social, economic, and ecological impacts, and the legal-political-institutional environments within which their development could occur, are discussed. Planning, design, and construction of near-shore complexes located off the Mid-Atlantic coast of the United States is emphasized.

  6. Developing a Master Plan for Your School. School Buildings Planning, Design, and Construction Series No. 1.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on how to set up a master planning team and establish a plan for quickly completing the building process. It provides an overview of…

  7. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  8. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  9. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  10. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  11. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  12. 25 CFR 170.500 - What program reviews do the Secretaries conduct?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Section 170.500 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... planning; (3) Design; (4) Contract administration; (5) Construction; (6) Financial management; and (7...

  13. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  14. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  15. 7 CFR 1724.54 - Requirements for RUS approval of plans and specifications.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... specifications for transmission construction projects which are not based on RUS approved line design data or do... section, plans and specifications for transmission construction which use previously approved design data... transformer, and the transmission switchyard at a generating plant. Warehouses and equipment service buildings...

  16. 24 CFR 941.402 - Project design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project design and construction... URBAN DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Project Development § 941.402 Project design and.... A PHA may certify that its proposed design and construction plans for the development are in...

  17. 25 CFR 170.405 - Can tribal transportation planning funds be used for road construction and other projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can tribal transportation planning funds be used for road construction and other projects? 170.405 Section 170.405 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian...

  18. 25 CFR 170.404 - What happens when a tribe uses its IRR Program construction funds for transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens when a tribe uses its IRR Program construction funds for transportation planning? 170.404 Section 170.404 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction...

  19. Construction Methods and Materials. School Buildings Planning, Design, and Construction Series No. 5.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on the various types of construction that may be used, the materials available, and some elementary aspects of the services required…

  20. 78 FR 41694 - Final Priority and Requirements; Education Facilities Clearinghouse

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... the collection and dissemination of best practices for the planning, design, financing, procurement... Facilities Clearinghouse program is to provide technical assistance and training on the planning, design... dissemination of best practices for the planning, design, financing, procurement, construction, improvement...

  1. FHWA road tunnel design guidelines

    DOT National Transportation Integrated Search

    2004-07-01

    This document provides technical criteria and guidance for the planning and design of road tunnels. Specific areas covered include planning, studies and investigations, design, and design of construction, of tunnels and shafts. Performance concepts a...

  2. 42 CFR 137.365 - What is the procedure for the Secretary's review and approval of project planning and design...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the...-Governance Tribe? (a) The Secretary shall review and approve planning documents to ensure compliance with... design documents for general compliance with requirements of the construction project agreement. (b) The...

  3. 7 CFR 1780.53 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., environmental, inspection, financial, legal or other services related to planning, designing, bidding... (CONTINUED) WATER AND WASTE LOANS AND GRANTS Planning, Designing, Bidding, Contracting, Constructing and...

  4. 30 CFR 817.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed, constructed and... surveyor, to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 817.49 of...

  5. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  6. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  7. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  8. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  9. 7 CFR 4280.119 - Construction planning and performing development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...

  10. 7 CFR 4280.119 - Construction planning and performing development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...

  11. 7 CFR 4280.119 - Construction planning and performing development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...

  12. The Methodology of Interactive Parametric Modelling of Construction Site Facilities in BIM Environment

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana

    2014-11-01

    Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.

  13. 48 CFR 2.101 - Definitions

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... whether a modification is minor include the value and size of the modification and the comparative value...

  14. Airport Planning and Design - Legal and Professional Competence Requirements

    NASA Astrophysics Data System (ADS)

    Kazda, Antonin

    2017-12-01

    Airport design and planning considerably differs from the design of other transport infrastructure. The reasons are the wide scope of regulation in civil aviation and the lack of links between the Civil Aviation Act and the Building Act. The effect is that the sequence of procedures, negotiation, and/or document approval is not clearly defined. The situation is further complicated by the fact that an airport is a unique construction both for the investor and for the local building authority. The paper is an outcome of our research, building on long-term experience in airport planning and design, and the elucidation of planning and approval processes with experts from the Transport Authority and the Ministry of Transport and Construction of the Slovak Republic.

  15. Analysis and preliminary design of Kunming land use and planning management information system

    NASA Astrophysics Data System (ADS)

    Li, Li; Chen, Zhenjie

    2007-06-01

    This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.

  16. 3D design terrain models for construction plans and GPS control of highway construction equipment.

    DOT National Transportation Integrated Search

    2010-03-01

    Research was conducted with the objectives of 1) identifying and characterizing benefits and technological, institutional, cultural, and : legal impediments associated with adoption of 3D design and construction technologies, identifying strategies t...

  17. Test plan : I-40 TTIS focus groups and personal interview

    DOT National Transportation Integrated Search

    1976-04-01

    This provides specific design recommendations, design considerations, and construction techniques for the construction of lateral support systems and underpinning. The design considerations are presented for each technique or method (solider piles, s...

  18. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... include the value and size of the modification and the comparative value and size of the final product...

  19. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... minor include the value and size of the modification and the comparative value and size of the final...

  20. Planned Missing Designs to Optimize the Efficiency of Latent Growth Parameter Estimates

    ERIC Educational Resources Information Center

    Rhemtulla, Mijke; Jia, Fan; Wu, Wei; Little, Todd D.

    2014-01-01

    We examine the performance of planned missing (PM) designs for correlated latent growth curve models. Using simulated data from a model where latent growth curves are fitted to two constructs over five time points, we apply three kinds of planned missingness. The first is item-level planned missingness using a three-form design at each wave such…

  1. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  2. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  3. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  4. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  5. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  6. Well Planning and Construction Haynesville Shale - East Texas

    EPA Pesticide Factsheets

    This paper will focus on the well planning and construction techniques Devon uses in the Haynesville Shale. It will briefly cover issues that are related to designing and drilling the well safely and protecting subsurface drinking water sources.

  7. 41 CFR 102-76.15 - What are design and construction services?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction services are— (a) Site planning and landscape design; (b) Architectural and interior design; and... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are design and... Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...

  8. Lessons Learned.

    ERIC Educational Resources Information Center

    Hassell, Kim Dale

    2000-01-01

    Discusses the common mistakes in school design and construction and how to avoid them. Mistake avoidance in mastering planning, site acquisition, drawing changes, budgeting, school design process, construction management, and the architect's role are highlighted. (GR)

  9. Development of Secondary Route Bridge Design Plan Guides

    DOT National Transportation Integrated Search

    2018-03-03

    The objective of this study is to develop a set of bridge plan guides for low-volume traffic roads. The purpose of the plans is to facilitate construction of new structures suitable for local agencies. The designs are to specifically address common l...

  10. Constructing a modern cytology laboratory: A toolkit for planning and design.

    PubMed

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A

    2013-01-01

    Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects.

  11. Constructing a modern cytology laboratory: A toolkit for planning and design

    PubMed Central

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A.

    2013-01-01

    Introduction: Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. Methods: The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. Results: The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Conclusions: Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects PMID:23599722

  12. 75 FR 13336 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Approved for Collection at Key West International Airport (EYW) and Use at EYW: Runway safety area design. Runway safety area construction. Approach clearing--design. Runway obstruction clearing--design. Runway obstruction clearing, phase II--construction. Noise implementation plan, phase 6--design. Noise implementation...

  13. Quality planning in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  14. Making the Most of Your School Site. School Buildings Planning, Design, and Construction Series No. 2.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on site selection covering selection criteria; traffic issues; and site services, such as water, power, and sewer. Additionally…

  15. 40 CFR Table 1 to Subpart Ggg of... - States That Have an Approved and Effective State Plan a

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or Reconstructed Since May 30, 1991... this Federal plan if it commenced construction before May 30, 1991 and has not been modified or...

  16. 40 CFR Table 1 to Subpart Ggg of... - States That Have an Approved and Effective State Plan a

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or Reconstructed Since May 30, 1991... this Federal plan if it commenced construction before May 30, 1991 and has not been modified or...

  17. 42 CFR 137.361 - Does the Secretary have any other opportunities to approve planning or design documents prepared...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in... opportunities to approve planning or design documents prepared by the Self-Governance Tribe? Yes, but only if...

  18. Study and development of techniques for automatic control of remote manipulators

    NASA Technical Reports Server (NTRS)

    Shaket, E.; Leal, A.

    1976-01-01

    An overall conceptual design for an autonomous control system of remote manipulators which utilizes feedback was constructed. The system consists of a description of the high-level capabilities of a model from which design algorithms are constructed. The autonomous capability is achieved through automatic planning and locally controlled execution of the plans. The operator gives his commands in high level task-oriented terms. The system transforms these commands into a plan. It uses built-in procedural knowledge of the problem domain and an internal model of the current state of the world.

  19. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  20. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  1. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...

  2. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...

  3. Planning for a New Generation of Public Library Buildings. The Greenwood Library Management Collection.

    ERIC Educational Resources Information Center

    McCabe, Gerard B.

    This book on public library design and construction contains the following chapters: (1) "Beginning the Plan"; (2) "Data for Planning"; (3) "Location: Finding a Site"; (4) "Interior Design"; (5) "Furnishing and Equipping the Library and Its Environs"; (6) "Other Views," including "Using Small College Library Planning Techniques in Public Library…

  4. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  5. Space architecture monograph series. Volume 4: Genesis 2: Advanced lunar outpost

    NASA Technical Reports Server (NTRS)

    Fieber, Joseph P.; Huebner-Moths, Janis; Paruleski, Kerry L.; Moore, Gary T. (Editor)

    1991-01-01

    This research and design study investigated advanced lunar habitats for astronauts and mission specialists on the Earth's moon. Design recommendations are based on environmental response to the lunar environment, human habitability (human factors and environmental behavior research), transportability (structural and materials system with least mass), constructability (minimizing extravehicular time), construction dependability and resilience, and suitability for NASA launch research missions in the 21st century. The recommended design uses lunar lava tubes, with construction being a combination of Space Station Freedom derived hard modules and light weight Kevlar laminate inflatable structures. The proposed habitat includes research labs and a biotron, crew quarters and crew support facility, mission control, health maintenance facility, maintenance work areas for psychological retreat, privacy, and comtemplation. Furniture, specialized equipment, and lighting are included in the analysis and design. Drawings include base master plans, construction sequencing, overall architectural configuration, detailed floor plans, sections and axonometrics, with interior perspectives.

  6. 25 CFR 170.402 - What is the tribal role in transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... transportation related meetings; (9) Performing transportation planning for operational and maintenance...

  7. 25 CFR 170.401 - What is BIA's role in transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... maintenance facilities; and (p) Researching rights-of-way documents for project planning. ...

  8. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and... designed and as approved in the reclamation plan. (4) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this chapter. (5) Siltation structures...

  9. Wake County Public School System Design Guidelines.

    ERIC Educational Resources Information Center

    Wake County Public School System, Raleigh, NC.

    The Wake County Public School System has published its guidelines for planning and design of functional, cost effective, and durable educational facilities that are attractive and enhance the students' educational experience. The guidelines present basic planning requirement and design criteria for the entire construction process, including: codes…

  10. Energy efficiency in light-frame wood construction

    Treesearch

    Gerald E. Sherwood; Gunard Hans

    1979-01-01

    This report presents information needed for design and construction of energy-efficient light-frame wood structures. The opening section discusses improving the thermal performance of a house by careful planning and design. A second section of the report provides technical information on the thermal properties of construction materials, and on the basic engineering...

  11. Perception of Construction Participants in Construction delays: A case study in Tamilnadu, India.

    NASA Astrophysics Data System (ADS)

    Rathinakumar, V.; Vignesh, T.; Dhivagar, K.

    2017-07-01

    Delays in the construction industry are universal fact, which affects the construction participants. The research work spotlights on determining the prevailing delays in the cities of Tamil Nadu, as perceived by the participants. After a few field level interactions, a questionnaire was framed and administered to the participants i.e., Consultants (50 Nos.), contractors (50 Nos.) and clients (150 Nos.) to understand their perception on the causes of delays. The factors for delay was categorized into 4 groups say Improper project planning, Design related issues, Finance related issues and Resource related issues. The responses were analysed using the SPSS software by applying ANOVA and Regression analysis. From the analysis, it was found that the personal financial problems of the client dominantly affect the entire construction progress and the subsequent design changes by the clients, Inadequate early project planning, labour related issues. Also, the delay groups were found to be the improper project planning and the Resource related issues.

  12. 17. Photographic copy of intial site plan for North Base: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photographic copy of intial site plan for North Base: AF Job No. 1045, Military Construction: Muroc Bombing Range, Muroc Lake, California; Materiel Test Site: Location Plan, Sheet No. 1 of 11, May 1942. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  13. Schools of Interest 5.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of School Planning.

    North Carolina local public school boards have the statutory responsibility for operating public schools and for entering into contracts for design and construction of their schools. This document presents examples of plans for school buildings planned or constructed during the last few years, as of 1981, representing a wide range of educational…

  14. Design in the Classroom: Exploring the Built Environment.

    ERIC Educational Resources Information Center

    Maine Arts Commission, Augusta.

    Design and the built environment are subjects of concern to Maine communities. State mandated town planning, new school construction, and the Department of Transportation plans to rebuild roads and bridges elicit public discussion. The study of design encourages elementary students to enter this public forum as informed citizens. The study of…

  15. Student-Designed Flume Arrives at NWTC | News | NREL

    Science.gov Websites

    opportunity to plan, design, and construct a flume for testing and characterizing hydrokinetic power devices . The project was one of several open to CSM students as part of the Capstone Design@Mines program transported to the National Wind Technology Center (NWTC) on Dec. 7. "The design and construction of the

  16. Advancing Integrated STEM Learning through Engineering Design: Sixth-Grade Students' Design and Construction of Earthquake Resistant Buildings

    ERIC Educational Resources Information Center

    English, Lyn D.; King, Donna; Smeed, Joanna

    2017-01-01

    As part of a 3-year longitudinal study, 136 sixth-grade students completed an engineering-based problem on earthquakes involving integrated STEM learning. Students employed engineering design processes and STEM disciplinary knowledge to plan, sketch, then construct a building designed to withstand earthquake damage, taking into account a number of…

  17. 33 CFR 263.15 - Program policies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...

  18. 33 CFR 263.15 - Program policies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...

  19. FPL designs meet family housing needs

    Treesearch

    G. E. Sherwood

    1972-01-01

    The Forest Products Laboratory (FPL) has developed five house plans for low-cost rural houses to demonstrate cost-saving principles of construction, The plans feature simplicity of design, but provide structurally sound houses that fulfill the needs of many families. To determine to what extent the plans were used, how they met the needs and the acceptance standards of...

  20. House Construction: How To Reduce Costs

    Treesearch

    Jerry O. Newman; Norman C. Teter; Constance D. O' Brien

    1969-01-01

    You're building a house and want to keep down the cost. How can you do it? First, plan carefully "on paper" before you start construction. By doing so, you can avoid costly mistakesinthebuildingandinthe purchase of materials. Careful planning and proper design will reduce not only the initial cost but also the cost of furnishings, utilities, and...

  1. 40 CFR 62.14565 - How do I comply with the increment of progress for achieving final compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... complete retrofit construction of control devices, as specified in the final control plan, so that, when...

  2. Two-Method Planned Missing Designs for Longitudinal Research

    ERIC Educational Resources Information Center

    Garnier-Villarreal, Mauricio; Rhemtulla, Mijke; Little, Todd D.

    2014-01-01

    We examine longitudinal extensions of the two-method measurement design, which uses planned missingness to optimize cost-efficiency and validity of hard-to-measure constructs. These designs use a combination of two measures: a "gold standard" that is highly valid but expensive to administer, and an inexpensive (e.g., survey-based)…

  3. How to Tackle Tough Facility Design Considerations

    ERIC Educational Resources Information Center

    Kalina, David

    2007-01-01

    This article is part of a series that has offered insight on planning a facilities project, hiring professionals, delivery system options and owner's responsibilities. In this article, the author focuses on some of the planning and design concepts one may be asked to consider in providing direction to his design and construction team. These…

  4. Development of 3D and 4D Bridge Models and Plans

    DOT National Transportation Integrated Search

    2018-05-28

    Since 2012, MDOT has been leading national efforts to modernize design development with 3D modeling. Early focus on roadway projects yielded streamlined plan production and digital data for construction. As MDOT pivots to 3D model-centric design, nat...

  5. Small Scale Irrigation Systems: A Training Manual. Planning--Construction--Operation and Maintenance of Small Scale Irrigation Systems. A Two-Week In-Service Training Program for Peace Corps Volunteers. Training for Development. Peace Corps Information Collection & Exchange Training Manual No. T-13.

    ERIC Educational Resources Information Center

    Development Planning and Research Associates, Inc., Manhattan, KS.

    This manual provides materials for a two-week inservice training program for Peace Corps volunteers on the planning, construction, and operation and maintenance of small-scale irrigation systems. The workshop is designed to be given by two experienced professionals: one with practical knowledge of irrigation system design, operation, and…

  6. Computer-Aided Structural Engineering (CASE) Project: State of the Art on Expert Systems Applications in Design, Construction and Maintenance of Structures

    DTIC Science & Technology

    1989-09-01

    OGT, F1EPQRTJTL4, W" - 3^ n"r-- n *ON EXPERT SYSTEMS IN DESIGN, CONSTRUCTION AND’, IWAJNTENANCE-OF STRUCTURES Arockiasamy, Sunghoon Lee Clepartrhent...based expert system applications in the areas of structural design, design standards, and construction planning. This study will aid in the development...of a comprehensive expert system for tvical hydraulic structures. Funding for this report was provided by the US Army Engineer Waterways Experiment

  7. 25 CFR 170.451 - Can IRR Program funds be used for archeological and environmental compliance?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... environmental compliance? 170.451 Section 170.451 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian... the appropriate Secretary(s); and (d) Construction easements. Design ...

  8. 77 FR 46518 - Draft Resource Management Plan/General Plan Draft Environmental Impact Statement/Revised Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Resource Management Plan/General Plan Draft... Recreation Area, Merced County, California AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of... California Department of Parks and Recreation was given the responsibility to plan, design, construct...

  9. MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints

    DTIC Science & Technology

    2001-08-01

    progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New

  10. 23. Photographic copy of an asconstructed site plan for North ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photographic copy of an as-constructed site plan for North Base: Air Force Flight Test Center, Edwards Air Force Base, Edwards, California: North Base Site Plan, February 1970. This drawing shows the North Base building distribution substantially as it appears in 1995. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  11. A Training Manual in Conducting a Workshop in the Design, Construction, Operation, Maintenance and Repair of Hydrams.

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Office of Programming and Training Coordination.

    This manual presents a comprehensive training design, suggested procedures, and materials for conducting a workshop in the design, construction, operation, maintenance, and repair of hydrams, and in the planning and implementation of hydram projects. Hydrams (hydraulic rams, hydraulic ram pumps, automatic hydraulic ram pumps, rams) are devices…

  12. Construction Systems. Curriculum Guide for Technology Education.

    ERIC Educational Resources Information Center

    Spencer, Albert G.

    This curriculum guide for a 1-semester or 1-year course on construction systems is designed to acquaint students with the nature of the construction industry and its technology--tools, materials, and methods of construction--as well as the systems for planning and managing construction projects. The guide contains a course outline, competencies…

  13. 25 CFR 170.470 - What are the IRR construction standards?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 170.470 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... this subpart lists design standards that may be used for roads and bridges. (1) Tribes may propose road...

  14. 40 CFR 35.2050 - Effect of approval or certification of documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2050 Effect of approval or certification of documents. Review or approval of facilities plans, design drawings... relieve the grantee of its responsibility to properly plan, design, build and effectively operate and...

  15. Holistic Approach to Learning and Teaching Introductory Object-Oriented Programming

    ERIC Educational Resources Information Center

    Thota, Neena; Whitfield, Richard

    2010-01-01

    This article describes a holistic approach to designing an introductory, object-oriented programming course. The design is grounded in constructivism and pedagogy of phenomenography. We use constructive alignment as the framework to align assessments, learning, and teaching with planned learning outcomes. We plan learning and teaching activities,…

  16. Learning from Lessons: Studying the Construction of Teacher Knowledge Catalysed by Purposefully-Designed Experimental Mathematics Lessons

    ERIC Educational Resources Information Center

    Clarke, Doug; Clarke, David; Roche, Anne; Chan, Man Ching Esther

    2015-01-01

    A central premise of this project is that teachers learn from the act of teaching a lesson and that this learning is evident in the planning and teaching of a subsequent lesson. In this project, the knowledge construction of mathematics teachers was examined utilising multi-camera research techniques during lesson planning, classroom interactions…

  17. 25 CFR 170.400 - What is the purpose of transportation planning?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... address current and future land use, economic development, traffic demand, public safety, health, and...

  18. Design of internal support structures for an inflatable lunar habitat

    NASA Technical Reports Server (NTRS)

    Cameron, Elizabeth A.; Duston, John A.; Lee, David D.

    1990-01-01

    NASA has a long range goal of constructing a fully equipped, manned lunar outpost on the near side of the moon by the year 2015. The proposed outpost includes an inflatable lunar habitat to support crews during missions longer that 12 months. A design for the internal support structures of the inflatable habitat is presented. The design solution includes material selection, substructure design, assembly plan development, and concept scale model construction. Alternate designs and design solutions for each component of the design are discussed. Alternate materials include aluminum, titanium, and reinforced polymers. Vertical support alternates include column systems, truss systems, suspension systems, and lunar lander supports. Horizontal alternates include beams, trusses, floor/truss systems, and expandable trusses. Feasibility studies on each alternate showed that truss systems and expandable trusses were the most feasible candidates for conceptual design. The team based the designs on the properties of 7075 T73 aluminum. The substructure assembly plan, minimizes assembly time and allows crews to construct the habitat without the use of EVA suits. In addition to the design solutions, the report gives conclusions and recommendations for further study of the inflatable habitat design.

  19. 25 CFR 170.473 - What happens when a construction project ends?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... inspection, as well as contractors and maintenance personnel. (2) All project information must be made...

  20. Winter Weather Response Guide

    DOT National Transportation Integrated Search

    2012-10-01

    The Texas Department of Transportation (TxDOT) has been given statutory authority for the : planning, design, construction, operation, and maintenance of the State Highway System. With : few new highways being constructed, the operation and maintenan...

  1. Renewable Energy Opportunity Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hancock, Ed; Mas, Carl

    1998-11-13

    Presently, the US EPA is constructing a new complex at Research Triangle Park, North Carolina to consolidate its research operations in the Raleigh-Durham area. The National Computer Center (NCC) is currently in the design process and is planned for construction as part of this complex. Implementation of the new technologies can be planned as part of the normal construction process, and full credit for elimination of the conventional technologies can be taken. Several renewable technologies are specified in the current plans for the buildings. The objective of this study is to identify measures that are likely to be both technicallymore » and economically feasible.« less

  2. 77 FR 51023 - Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... export of goods and services for the design and construction of an aquarium. Brief non-proprietary... industry. Parties: Principal Supplier: International Concept Management. Obligor: State of Cear[aacute... Planning, Budget and Management. Description of Items Being Exported: Design, engineering and construction...

  3. The Utilization and Design of Physical Facilities for the Rehabilitation of Mentally Retarded. Final Project Report.

    ERIC Educational Resources Information Center

    Bair, Howard V.; Leland, Henry

    To investigate the appropriate design and utilization of physical facilities being constructed as a rehabilitation center, a variety of centers was examined. Conclusions were that flexibility in construction of the physical plant, including nonpermanent walls and fixtures was necessary; program planning should be included in architectural…

  4. Car Builder: Design, Construct and Test Your Own Cars. School Version with Lesson Plans. [CD-ROM].

    ERIC Educational Resources Information Center

    Highsmith, Joni Bitman

    Car Builder is a scientific CD-ROM-based simulation program that lets students design, construct, modify, test, and compare their own cars. Students can design sedans, four-wheel-drive vehicles, vans, sport cars, and hot rods. They may select for aerodynamics, power, and racing ability, or economic and fuel efficiency. It is a program that teaches…

  5. Space Solar Power Program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arif, Humayun; Barbosa, Hugo; Bardet, Christophe

    1992-08-01

    Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.

  6. 25 CFR 170.410 - What is the purpose of tribal long-range transportation planning?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads.... These strategies should address future land use, economic development, traffic demand, public safety...

  7. QA program plan plutonium stabilization and handling project W-460

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, J.W.

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

  8. The MAP program: building the digital terrain model.

    Treesearch

    R.H. Twito; R.W. Mifflin; R.J. McGaughey

    1987-01-01

    PLANS, a software package for integrated timber-harvest planning, uses digital terrain models to provide the topographic data needed to fit harvest and transportation designs to specific terrain. MAP, an integral program in the PLANS package, is used to construct the digital terrain models required by PLANS. MAP establishes digital terrain models using digitizer-traced...

  9. Site characterization progress report: Yucca Mountain, Nevada. Number 15, April 1--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on twomore » of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault.« less

  10. Competency-Based Preservice Construction Trades Curriculum.

    ERIC Educational Resources Information Center

    Nelms, Howard F.

    Intended for use at Eastern Illinois University in a model curriculum designed to prepare secondary school teachers in the field of residential building, this curriculum guide provides a competency-based preservice construction trades program. The guide is divided into thirteen units as follows: (1) pre-construction planning; (2) structural…

  11. Problem Solving in a Middle School Robotics Design Classroom

    NASA Astrophysics Data System (ADS)

    Norton, Stephen J.; McRobbie, Campbell J.; Ginns, Ian S.

    2007-07-01

    Little research has been conducted on how students work when they are required to plan, build and evaluate artefacts in technology rich learning environments such as those supported by tools including flow charts, Labview programming and Lego construction. In this study, activity theory was used as an analytic tool to examine the social construction of meaning. There was a focus on the effect of teachers’ goals and the rules they enacted upon student use of the flow chart planning tool, and the tools of the programming language Labview and Lego construction. It was found that the articulation of a teacher’s goals via rules and divisions of labour helped to form distinct communities of learning and influenced the development of different problem solving strategies. The use of the planning tool flow charting was associated with continuity of approach, integration of problem solutions including appreciation of the nexus between construction and programming, and greater educational transformation. Students who flow charted defined problems in a more holistic way and demonstrated more methodical, insightful and integrated approaches to their use of tools. The findings have implications for teaching in design dominated learning environments.

  12. Construction Monitoring of Soft Ground Rapid Transit Tunnels : Volume 2. Appendixes.

    DOT National Transportation Integrated Search

    1974-11-01

    The Urban Mass Transportation Administration (UMTA) Tunneling Program Concentrates its efforts on reducing tunneling costs, minimizing environmental impact and enhancing safety as it applies to the planning, organization, design, construction and mai...

  13. Selection of interest and inflation rates for infrastructure investment analyses.

    DOT National Transportation Integrated Search

    2014-12-01

    The South Dakota Department of Transportation (SDDOT) uses engineering economic analyses (EEA) to : support planning, design, and construction decision-making such as project programming and planning, : pavement type selection, and the occasional val...

  14. Computer aided system engineering for space construction

    NASA Technical Reports Server (NTRS)

    Racheli, Ugo

    1989-01-01

    This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.

  15. Roads and Airfields I (Programed Instruction). Engineer Subcourse 64-9.

    ERIC Educational Resources Information Center

    Army Engineer School, Fort Belvoir, VA.

    The document is a programed text for a correspondence course in the planning, construction, and maintenance of military roads and airfields. There are seven lessons: construction requirements and design criteria; road reconnaissance and site selection; airfield reconnaissance and site selection; layout procedures, construction staking, and field…

  16. 7 CFR 4280.115 - Construction planning and performing development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Renewable Energy Systems and Energy Efficiency Improvements Program Section A. Grants § 4280.115..., designing, bidding, contracting, and constructing renewable energy systems and energy efficiency improvement... accordance with Form RD 4280-2, “Grant Agreement,” and Form RD 1924-6, “Construction Contract,” or other...

  17. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for...

  18. Building Construction Estimating, Carpentry: 901897.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course for grades 11 and 12 in carpentry designed to provide instructions in mathematics and its application to determining construction costs. Students completing the course will be expected to have the skills and knowledge of building construction plans, concrete forms, walls, roofs, doors and stairs, in addition…

  19. Establishment of Biosafety Level-3 (BSL-3) laboratory: Important criteria to consider while designing, constructing, commissioning & operating the facility in Indian setting

    PubMed Central

    Mourya, Devendra T.; Yadav, Pragya D.; Majumdar, Triparna Dutta; Chauhan, Devendra S.; Katoch, Vishwa Mohan

    2014-01-01

    Since the enactment of Environmental Protection Act in 1989 and Department of Biotechnology (DBT) guidelines to deal with genetically modified organisms, India has embarked on establishing various levels of biosafety laboratories to deal with highly infectious and pathogenic organisms. Occurrence of outbreaks due to rapidly spreading respiratory and haemorrhagic fever causing viruses has caused an urgency to create a safe laboratory environment. This has thus become a mandate, not only to protect laboratory workers, but also to protect the environment and community. In India, technology and science are progressing rapidly. Several BSL-3 [=high containment] laboratories are in the planning or execution phase, to tackle biosafety issues involved in handling highly infectious disease agents required for basic research and diagnosis. In most of the developing countries, the awareness about biocontainment has increased but planning, designing, constructing and operating BSL-3 laboratories need regular updates about the design and construction of facilities and clear definition of risk groups and their handling which should be in harmony with the latest international practices. This article describes the major steps involved in the process of construction of a BSL-3 laboratory in Indian settings, from freezing the concept of proposal to operationalization phase. The key to success of this kind of project is strong institutional commitment to biosafety norms, adequate fund availability, careful planning and designing, hiring good construction agency, monitoring by experienced consultancy agency and involvement of scientific and engineering personnel with biocontainment experience in the process. PMID:25297350

  20. Establishment of Biosafety Level-3 (BSL-3) laboratory: important criteria to consider while designing, constructing, commissioning & operating the facility in Indian setting.

    PubMed

    Mourya, Devendra T; Yadav, Pragya D; Majumdar, Triparna Dutta; Chauhan, Devendra S; Katoch, Vishwa Mohan

    2014-08-01

    Since the enactment of Environmental Protection Act in 1989 and Department of Biotechnology (DBT) guidelines to deal with genetically modified organisms, India has embarked on establishing various levels of biosafety laboratories to deal with highly infectious and pathogenic organisms. Occurrence of outbreaks due to rapidly spreading respiratory and haemorrhagic fever causing viruses has caused an urgency to create a safe laboratory environment. This has thus become a mandate, not only to protect laboratory workers, but also to protect the environment and community. In India, technology and science are progressing rapidly. Several BSL-3 [=high containment] laboratories are in the planning or execution phase, to tackle biosafety issues involved in handling highly infectious disease agents required for basic research and diagnosis. In most of the developing countries, the awareness about biocontainment has increased but planning, designing, constructing and operating BSL-3 laboratories need regular updates about the design and construction of facilities and clear definition of risk groups and their handling which should be in harmony with the latest international practices. This article describes the major steps involved in the process of construction of a BSL-3 laboratory in Indian settings, from freezing the concept of proposal to operationalization phase. The key to success of this kind of project is strong institutional commitment to biosafety norms, adequate fund availability, careful planning and designing, hiring good construction agency, monitoring by experienced consultancy agency and involvement of scientific and engineering personnel with biocontainment experience in the process.

  1. 25 CFR 170.438 - How must BIA or a tribe inform the public when a hearing is held?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... is held? 170.438 Section 170.438 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation..., activities to be conducted, etc.; (4) Where preliminary plans, designs or specifications may be reviewed; and...

  2. 40 CFR 62.14560 - How do I comply with the increment of progress for submittal of a control plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... requirements of this subpart. (2) The type(s) of waste to be burned. (3) The maximum design waste burning...

  3. 40 CFR 62.14560 - How do I comply with the increment of progress for submittal of a control plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... requirements of this subpart. (2) The type(s) of waste to be burned. (3) The maximum design waste burning...

  4. 40 CFR 62.14560 - How do I comply with the increment of progress for submittal of a control plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... requirements of this subpart. (2) The type(s) of waste to be burned. (3) The maximum design waste burning...

  5. Technical Handbook for Facilities Engineering and Construction Manual, Part 2: Federally Assisted Activities. Guide for Project Applicants-Construction Management Services. Department Technical Handbook Series.

    ERIC Educational Resources Information Center

    Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.

    This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…

  6. Look Ahead: Long-Range Learning Plans

    ERIC Educational Resources Information Center

    Weinstein, Margery

    2010-01-01

    Faced with an unsteady economy and fluctuating learning needs, planning a learning strategy designed to last longer than the next six months can be a tall order. But a long-range learning plan can provide a road map for success. In this article, four companies (KPMG LLP, CarMax, DPR Construction, and EMC Corp.) describe their learning plans, and…

  7. Systems Analysis of Rapid Transit Underground Construction : Volume 1. Sections 1-5.

    DOT National Transportation Integrated Search

    1974-12-01

    This study describes rapid transit system implementation, design, and construction procedures. The relationships and responsibilities of governmental, private, and public groups involved in planning and implementing an urban rapid transit system are ...

  8. Oregon Department of Transportation research leader : fall 2008.

    DOT National Transportation Integrated Search

    2008-01-01

    The newsletter includes: : 1) To ensure safe travel through construction work zones, Traffic Control Plans (TCPs) are developed to communicate required traffic control measures to the construction team. The quality of the design and implementation of...

  9. 38 CFR 39.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... selection, land acquisition, design and planning, earth moving, landscaping, construction, and provision of... cemetery. Improvement means the enhancement of a cemetery through landscaping, construction, or renovation of cemetery infrastructure, such as building expansion and upgrades to roads and irrigation systems...

  10. 38 CFR 39.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... selection, land acquisition, design and planning, earth moving, landscaping, construction, and provision of... cemetery. Improvement means the enhancement of a cemetery through landscaping, construction, or renovation of cemetery infrastructure, such as building expansion and upgrades to roads and irrigation systems...

  11. 38 CFR 39.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... selection, land acquisition, design and planning, earth moving, landscaping, construction, and provision of... cemetery. Improvement means the enhancement of a cemetery through landscaping, construction, or renovation of cemetery infrastructure, such as building expansion and upgrades to roads and irrigation systems...

  12. Gardening as vector of a humanization of high-rise building

    NASA Astrophysics Data System (ADS)

    Lekareva, Nina; Zaslavskaya, Anna

    2018-03-01

    Article is devoted to issue of integration of vertical gardening into structure of high-rise building in the conditions of the constrained town-planning situation. On the basis of the analysis of the existing experience of design and building of "biopositive" high-rise building ecological, town-planning, social and constructive advantages of the organization of gardens on roofs and vertical gardens are considered [1]. As the main mechanism of increase in investment appeal of high-rise building the principle of a humanization due to gardening of high-rise building taking into account requirements of ecology, energy efficiency of buildings and improvement of quality of construction with minimization of expenses and maximizing comfort moves forward. The National Standards of Green construction designed to adapt the international requirements of architecture and construction of the energy efficient, eco-friendly and comfortable building or a complex to local conditions are considered [2,3].

  13. 25 CFR 170.406 - How must tribes use planning funds?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How must tribes use planning funds? 170.406 Section 170.406 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  14. 25 CFR 170.407 - What happens to unobligated planning funds?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens to unobligated planning funds? 170.407 Section 170.407 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  15. 25 CFR 170.400 - What is the purpose of transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the purpose of transportation planning? 170.400 Section 170.400 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  16. Programming of Urban Revitalization

    NASA Astrophysics Data System (ADS)

    Biliński, Tadeusz

    2016-12-01

    The planning stage of the investment-construction process is of a crucial importance. Its overall impact on the costs, construction time and the quality of design solutions is huge. However, in practice, little attention is given to this pre-design stage, except for public buildings or other buildings of particular importance. In consequence, the results of investment and construction activities are unsatisfactory. Therefore, the issue has been given careful consideration in this paper. The paper discusses the issue of programming urban revitalization, emphasizing its socio-economic importance. To illustrate the complexity of revitalization projects planning, the author draws attention to social, economic, technical and organisational factors, such as public participation, reorganization and revaluation of land use planning, rationalization of energy use, organization and management of revitalization processes, as well as technical progress. Summarising the paper, the author concludes that in order to improve the quality of life of town residents and to protect material national heritage, it is indispensable to continuously revitalize subsequent town areas.

  17. The role of descriptive norm within the theory of planned behavior in predicting Korean Americans' exercise behavior.

    PubMed

    Lee, Hyo

    2011-08-01

    There are few studies investigating psychosocial mechanisms in Korean Americans' exercise behavior. The present study tested the usefulness of the theory of planned behavior in predicting Korean American's exercise behavior and whether the descriptive norm (i.e., perceptions of what others do) improved the predictive validity of the theory of planned behavior. Using a retrospective design and self-report measures, web-survey responses from 198 Korean-American adults were analyzed using hierarchical regression analyses. The theory of planned behavior constructs accounted for 31% of exercise behavior and 43% of exercise intention. Intention and perceived behavioral control were significant predictors of exercise behavior. Although the descriptive norm did not augment the theory of planned behavior, all original constructs--attitude, injunctive norm (a narrow definition of subjective norm), and perceived behavioral control--statistically significantly predicted leisure-time physical activity intention. Future studies should consider random sampling, prospective design, and objective measures of physical activity.

  18. 42 CFR 136.101 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of... including feasibility studies, construction, operation, provision, or maintenance of services and facilities provided to Indians and, (b) for projects for planning, training, evaluation or other activities designed...

  19. 25 CFR 900.120 - How does an Indian tribe or tribal organization find out about a construction project?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.120 How does an Indian tribe or..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or...

  20. Integral stormwater management master plan and design in an ecological community.

    PubMed

    Che, Wu; Zhao, Yang; Yang, Zheng; Li, Junqi; Shi, Man

    2014-09-01

    Urban stormwater runoff nearly discharges directly into bodies of water through gray infrastructure in China, such as sewers, impermeable ditches, and pump stations. As urban flooding, water shortage, and other environment problems become serious, integrated water environment management is becoming increasingly complex and challenging. At more than 200ha, the Oriental Sun City community is a large retirement community located in the eastern side of Beijing. During the beginning of its construction, the project faced a series of serious water environment crises such as eutrophication, flood risk, water shortage, and high maintenance costs. To address these issues, an integral stormwater management master plan was developed based on the concept of low impact development (LID). A large number of LID and green stormwater infrastructure (GSI) approaches were designed and applied in the community to replace traditional stormwater drainage systems completely. These approaches mainly included bioretention (which captured nearly 85th percentile volume of the annual runoff in the site, nearly 5.4×10(5)m(3) annually), swales (which functioned as a substitute for traditional stormwater pipes), waterscapes, and stormwater wetlands. Finally, a stormwater system plan was proposed by integrating with the gray water system, landscape planning, an architectural master plan, and related consultations that supported the entire construction period. After more than 10 years of planning, designing, construction, and operation, Oriental Sun City has become one of the earliest modern large-scale LID communities in China. Moreover, the project not only addressed the crisis efficiently and effectively, but also yielded economic and ecological benefits. Copyright © 2014. Published by Elsevier B.V.

  1. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  2. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  3. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  4. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  5. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  6. 25 CFR 170.472 - What construction records must tribes and BIA keep?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What construction records must tribes and BIA keep? 170.472 Section 170.472 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  7. Planning in context: A situated view of children's management of science projects

    NASA Astrophysics Data System (ADS)

    Marshall, Susan Katharine

    This study investigated children's collaborative planning of a complex, long-term software design project. Using sociocultural methods, it examined over time the development of design teams' planning negotiations and tools to document the coconstruction of cultural frameworks to organize teams' shared understanding of what and how to plan. Results indicated that student teams developed frameworks to address a set of common planning functions that included design planning, project metaplanning (things such as division of labor or sharing of computer resources) and team collaboration management planning. There were also some between-team variations in planning frameworks, within a bandwidth of options. Teams engaged in opportunistic planning, which reflected shifts in strategies in response to new circumstances over time. Team members with past design project experience ("oldtimers") demonstrated the transfer of their planning framework to the current design task, and they supported the developing participation of "newcomers." Teams constructed physical tools (e.g. planning boards) that acted as visual representations of teams' planning frameworks, and inscriptions of team thinking. The assigned functions of the tools also shifted over time with changing project circumstances. The discussion reexamines current approaches to the study of planning and discusses their educational implications.

  8. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Allowance for Facilities Planning and Design B Appendix B to Subpart I of Part 35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works Pt. 35, Subpt. I, App. B Appendix B to...

  9. Trends in Education.

    ERIC Educational Resources Information Center

    School Planning & Management, 2002

    2002-01-01

    Several architects, planners, administrators, and contractors answer questions about trends related to school construction, interior design, business, security, and technology. Trends concern funding issues, specialized designs, planning for safety, technological integration, and equity in services. (EV)

  10. Prepare to protect: Operating and maintaining a tornado safe room.

    PubMed

    Herseth, Andrew; Goldsmith-Grinspoon, Jennifer; Scott, Pataya

    2017-06-01

    Operating and maintaining a tornado safe room can be critical to the effective continuity of business operations because a firm's most valuable asset is its people. This paper describes aspects of operations and maintenance (O&M) for existing tornado safe rooms as well as a few planning and design aspects that affect the ultimate operation of a safe room for situations where a safe room is planned, but not yet constructed. The information is based on several Federal Emergency Management Agency safe room publications that provide guidance on emergency management and operations, as well as the design and construction of tornado safe rooms.

  11. 25 CFR 170.410 - What is the purpose of tribal long-range transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the purpose of tribal long-range transportation planning? 170.410 Section 170.410 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  12. 25 CFR 170.436 - How are public hearings for IRR planning and projects funded?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are public hearings for IRR planning and projects funded? 170.436 Section 170.436 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  13. 25 CFR 170.411 - What may a long-range transportation plan include?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What may a long-range transportation plan include? 170.411 Section 170.411 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  14. 25 CFR 170.403 - What IRR Program funds can be used for transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What IRR Program funds can be used for transportation planning? 170.403 Section 170.403 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  15. 25 CFR 170.461 - May a tribe approve plans, specifications, and estimates?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false May a tribe approve plans, specifications, and estimates? 170.461 Section 170.461 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program...

  16. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A20-0805-4999-400-00-0-0-2, 2100000] Resource... Reservoir State Recreation Area, Merced County, California AGENCY: Bureau of Reclamation, Interior. ACTION... Parks and Recreation was given the responsibility to plan, design, construct, maintain, and operate the...

  17. Standard plans for southern pine bridges

    Treesearch

    P. D. Hilbrich Lee; M. A. Ritter; M. H. Triche

    1995-01-01

    The development of standardized timber bridge plans and specifications is a key element in improving design and construction practices. The bridge plans presented were developed as a cooperative effort between the USDA Forest Service, Forest Products Laboratory (FPL); the University of Alabama; and the Southern Pine Council and are the first step in developing...

  18. Development of high integrity, maximum durability concrete structures for LLW disposal facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, W.P.

    1992-05-01

    A number of disposal facilities for Low-Level Radioactive Wastes have been planned for the Savannah River Site. Design has been completed for disposal vaults for several waste classifications and construction is nearly complete or well underway on some facilities. Specific design criteria varies somewhat for each waste classification. All disposal units have been designed as below-grade concrete vaults, although the majority will be above ground for many years before being encapsulated with earth at final closure. Some classes of vaults have a minimum required service life of 100 years. All vaults utilize a unique blend of cement, blast furnace slagmore » and pozzolan. The design synthesizes the properties of the concrete mix with carefully planned design details and construction methodologies to (1) eliminate uncontrolled cracking; (2) minimize leakage potential; and (3) maximize durability. The first of these vaults will become operational in 1992. 9 refs.« less

  19. Development of high integrity, maximum durability concrete structures for LLW disposal facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, W.P.

    1992-01-01

    A number of disposal facilities for Low-Level Radioactive Wastes have been planned for the Savannah River Site. Design has been completed for disposal vaults for several waste classifications and construction is nearly complete or well underway on some facilities. Specific design criteria varies somewhat for each waste classification. All disposal units have been designed as below-grade concrete vaults, although the majority will be above ground for many years before being encapsulated with earth at final closure. Some classes of vaults have a minimum required service life of 100 years. All vaults utilize a unique blend of cement, blast furnace slagmore » and pozzolan. The design synthesizes the properties of the concrete mix with carefully planned design details and construction methodologies to (1) eliminate uncontrolled cracking; (2) minimize leakage potential; and (3) maximize durability. The first of these vaults will become operational in 1992. 9 refs.« less

  20. Construction Monitoring of Soft Ground Rapid Transit Tunnels : Volume 1. A Definition of Needs and Potential Developments.

    DOT National Transportation Integrated Search

    1974-11-01

    The Urban Mass Transportation Administration (UMTA) Tunneling Program Concentrates its efforts on reducing tunneling costs, minimizing environmental impact and enhancing safety as it applies to the planning, organization, design, construction and mai...

  1. Safer construction and maintenance practices to minimize potential liability by counties from accidents.

    DOT National Transportation Integrated Search

    1979-09-01

    Tort claims resulting from alleged highway defects have introduced : an additional element in the planning, design, construction, and maintenance : of highways. A survey of county governments in Iowa was undertaken : in order to quantify the magnitud...

  2. CasCADe: A Novel 4D Visualization System for Virtual Construction Planning.

    PubMed

    Ivson, Paulo; Nascimento, Daniel; Celes, Waldemar; Barbosa, Simone Dj

    2018-01-01

    Building Information Modeling (BIM) provides an integrated 3D environment to manage large-scale engineering projects. The Architecture, Engineering and Construction (AEC) industry explores 4D visualizations over these datasets for virtual construction planning. However, existing solutions lack adequate visual mechanisms to inspect the underlying schedule and make inconsistencies readily apparent. The goal of this paper is to apply best practices of information visualization to improve 4D analysis of construction plans. We first present a review of previous work that identifies common use cases and limitations. We then consulted with AEC professionals to specify the main design requirements for such applications. These guided the development of CasCADe, a novel 4D visualization system where task sequencing and spatio-temporal simultaneity are immediately apparent. This unique framework enables the combination of diverse analytical features to create an information-rich analysis environment. We also describe how engineering collaborators used CasCADe to review the real-world construction plans of an Oil & Gas process plant. The system made evident schedule uncertainties, identified work-space conflicts and helped analyze other constructability issues. The results and contributions of this paper suggest new avenues for future research in information visualization for the AEC industry.

  3. 25 CFR 170.455 - How are design standards used in IRR projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... conducive to safety, durability, and economy of maintenance; (b) The particular needs of each locality, and...

  4. 25 CFR 170.455 - How are design standards used in IRR projects?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... conducive to safety, durability, and economy of maintenance; (b) The particular needs of each locality, and...

  5. 75 FR 34004 - State Cemetery Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... architectural design codes that apply to grant applicants, we decided to update those references in a separate.... 39.63 Architectural design standards. Subpart C--Operation and Maintenance Projects Grant... acquisition, design and planning, earth moving, landscaping, construction, and provision of initial operating...

  6. Modern Vernacular.

    ERIC Educational Resources Information Center

    Taggart, Jim

    2002-01-01

    Describes the design of the Nicola Valley Institute of Technology in British Columbia, including the educational context and design goals. Includes information on architects, consultants, and cost, as well as floor plans and photographs. Discusses how the design for this First Nations school blends aboriginal constructs and…

  7. 40 CFR 62.14515 - Can my CISWI unit be covered by both a State plan and this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Applicability § 62.14515 Can my...

  8. 40 CFR 62.14515 - Can my CISWI unit be covered by both a State plan and this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Applicability § 62.14515 Can my...

  9. 40 CFR 62.14515 - Can my CISWI unit be covered by both a State plan and this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Applicability § 62.14515 Can my...

  10. Army Corps of Engineers: Better Guidance Could Improve Corps’ Information on Water Resources Projects Undertaken by Nonfederal Sponsors

    DTIC Science & Technology

    2016-12-01

    Nonfederal Sponsors Why GAO Did This Study Through its Civil Works program, the Corps designs , constructs, and maintains federal water resources...Public Works United States Senate Dear Mr. Chairman: The U.S. Army Corps of Engineers (Corps) is the world’s largest public engineering, design ...its Civil Works Program, in general, the Corps plans, designs , constructs, operates, and maintains a wide range of water resources projects. Congress

  11. 5. Photographic copy of engineering drawing showing plans, elevation and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of engineering drawing showing plans, elevation and section of Deluge Water System, including reservior (4316), Pump House (4317), and water tower. Job No. Muroc A(5-ll), Military Construction, San Bernardino-Mojave Area, San Bernardino, California: Muroc Bombing Range, Muroc Lake, California.; Additional Facilities for Materiel Center Flight Test Base, Water Supply System, Plans and Sections, Sheet 5 of 10, May 1943. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, Deluge Water Pumping Station, Near Second & D Streets, Boron, Kern County, CA

  12. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  13. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  14. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  15. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  16. 40 CFR 40.115-1 - Construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... investigations and studies, surveys, designs, plans, working drawings, specifications, procedures, and other... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Construction. 40.115-1 Section 40.115-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE RESEARCH AND...

  17. Construction Management for Educational Facilities: Professional Services' Procurement and Competitive Bid Statutes.

    ERIC Educational Resources Information Center

    Goldblatt, Steven M.; Wood, R. Craig

    Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…

  18. Implementing AORN recommended practices for a safe environment of care, part II.

    PubMed

    Kennedy, Lynne

    2014-09-01

    Construction in and around a working perioperative suite is a challenge beyond merely managing traffic patterns and maintaining the sterile field. The AORN "Recommended practices for a safe environment of care, part II" provides guidance on building design; movement of patients, personnel, supplies, and equipment; environmental controls; safety and security; and control of noise and distractions. Whether the OR suite evolves through construction, reconstruction, or remodeling, a multidisciplinary team of construction experts and health care professionals should create a functional plan and communicate at every stage of the project to maintain a safe environment and achieve a well-designed outcome. Emergency preparedness, a facility-wide security plan, and minimization of noise and distractions in the OR also help enhance the safety of the perioperative environment. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  19. THE PREPARATION OF CURRICULUM MATERIALS AND THE DEVELOPMENT OF TEACHERS FOR AN EXPERIMENTAL APPLICATION OF THE CLUSTER CONCEPT OF VOCATIONAL EDUCATION AT THE SECONDARY SCHOOL LEVEL. VOLUME II, INSTRUCTIONAL PLANS FOR THE CONSTRUCTION CLUSTER.

    ERIC Educational Resources Information Center

    MALEY, DONALD

    DESIGNED FOR USE WITH 11TH AND 12TH GRADE STUDENTS, THIS CURRICULUM GUIDE FOR THE OCCUPATIONAL CLUSTER IN CONSTRUCTION WAS DEVELOPED BY PARTICIPATING TEACHERS FROM RESULTS OF THE RESEARCH PROCEDURES DESCRIBED IN VOLUME I (VT 004 162). THE COURSE DESCRIPTION, NEED FOR THE COURSE, COURSE OBJECTIVES, PROCEDURE, AND INSTRUCTIONAL PLAN ARE DISCUSSED…

  20. A Tasteful Collection.

    ERIC Educational Resources Information Center

    Canadian Architect, 2003

    2003-01-01

    Describes the design of the Canadian Wine Library at the University of British Columbia, including the educational context and design goals. Includes information on the architects, manufacturers/suppliers, and construction team; a general building description; and commentary on the design. Also includes the floor plan and photographs. (EV)

  1. Guidelines for the design and evaluation of human factors aspects of automated guideway transit systems

    DOT National Transportation Integrated Search

    1979-03-01

    This report is a summary of human factors considerations for the planning, : deSign, construction, and implementation of Automated Guideway Transit (AGT) Systems : including Downtown People Mover (DPM) systems. Design concepts such as passenger : saf...

  2. 40 CFR 62.8871 - Identification of sources.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Ohio Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.8871 Identification of sources. The plan applies to all existing municipal solid waste landfills for which construction, reconstruction or...

  3. 40 CFR 62.7101 - Identification of sources.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Nevada Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.7101 Identification of sources. The plan applies to all existing municipal solid waste landfills for which construction, reconstruction, or...

  4. 40 CFR 62.13106 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Control of Air Emissions of Designated Pollutants from Existing Hospital, Medical, and Infectious Waste.../Infectious Waste Incinerators. (b) Identification of sources: The plan applies to all applicable existing hospital/medical/infectious waste incinerators for which construction commenced on or before June 20, 1996...

  5. Determinants of customers' intention to participate in a Korean restaurant health promotion program: an application of the theory of planned behavior.

    PubMed

    Hong, Kyungeui; Gittelsohn, Joel; Joung, Hyojee

    2010-06-01

    The purpose of this study was to investigate the effects of personal characteristics and theory of planned behavior (TPB) constructs on the intention to participate in a restaurant health promotion program. In total, 830 adults residing in Seoul were sampled by a multi-stage cluster and random sampling design. Data were collected from a structured self-administered questionnaire, which covered variables concerning demographics, health status and TPB constructs including attitude, subjective norm and perceived behavioral control. A path analysis combining personal characteristics and TPB constructs was used to investigate determinants of the customers' intention. Positive and negative attitudes, subjective norms and perceived behavioral control directly affected the intention to participate. Demographics and health status both directly and indirectly affected the intention to participate. This study identifies personal characteristics and TPB constructs that are important to planning and implementing a restaurant health promotion program.

  6. Web-Based Cognitive Apprenticeship Model for Improving Pre-Service Teachers' Performances and Attitudes towards Instructional Planning: Design and Field Experiment

    ERIC Educational Resources Information Center

    Liu, Tzu-Chien

    2005-01-01

    Instructional planning is an essential professional activity often used by teachers. However, some characteristics of existing university-based teacher education programs may hamper pre-service teachers' learning of instructional planning. Thus, this study adopts the cognitive apprenticeship as a theoretical foundation to construct a web-based…

  7. Area Community College and Area Vocational School Construction.

    ERIC Educational Resources Information Center

    Iowa State Dept. of Public Instruction, Des Moines.

    The purpose of this guideline is to assist in the planning process, to encourage good school plant design, and to serve as criteria in the evaluation of area community college and area vocational school plans. It is divided into the following five sections--(1) area plant planning, (2) area sites, (3) physical facilities, (4) service systems, and…

  8. 25 CFR 170.413 - What is the public role in developing the long-range transportation plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the public role in developing the long-range transportation plan? 170.413 Section 170.413 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation...

  9. 25 CFR 170.412 - How is the tribal IRR long-range transportation plan developed and approved?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How is the tribal IRR long-range transportation plan developed and approved? 170.412 Section 170.412 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian...

  10. 25 CFR 170.414 - How is the tribal long-range transportation plan used and updated?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How is the tribal long-range transportation plan used and updated? 170.414 Section 170.414 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  11. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  12. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  13. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  14. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  15. Clean Air by Design.

    ERIC Educational Resources Information Center

    Crawford, Gary N.

    1995-01-01

    Planning new construction is an opportunity to recognize indoor environmental quality (IEQ) issues. Provides an overview of some common IEQ issues associated with construction projects. A building's heating, ventilating, and air-conditioning (HVAC) system is by far the single most common cause of IEQ problems and complaints. (MLF)

  16. Market analysis of construction materials with recommendations for the future of the industry : final report, January 14, 2010.

    DOT National Transportation Integrated Search

    2010-01-14

    Due to the volatility of current highway construction commodity prices, owners, contractors, and designers are facing serious challenges in both short-term estimating and long-term planning. Among these challenges is significant uncertainty about the...

  17. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  18. 46 CFR 162.060-10 - Approval procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... required by this subpart must be duly noted in the Experimental Design section of the Test Plan. (c) The... design and construction requirements in § 162.060-20 of this subpart; (2) It is evaluated, inspected, and...

  19. 46 CFR 162.060-10 - Approval procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... required by this subpart must be duly noted in the Experimental Design section of the Test Plan. (c) The... design and construction requirements in § 162.060-20 of this subpart; (2) It is evaluated, inspected, and...

  20. 14 CFR Appendix A to Part 158 - Assurances

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... State and local laws and regulations. 4. Environmental, airspace and airport layout plan requirements... appropriate airspace finding has been made; and (c) The FAA Airport Layout Plan with respect to the project... airport design, construction and equipment standards and specifications contained in advisory circulars...

  1. 14 CFR Appendix A to Part 158 - Assurances

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... State and local laws and regulations. 4. Environmental, airspace and airport layout plan requirements... appropriate airspace finding has been made; and (c) The FAA Airport Layout Plan with respect to the project... airport design, construction and equipment standards and specifications contained in advisory circulars...

  2. 14 CFR Appendix A to Part 158 - Assurances

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... State and local laws and regulations. 4. Environmental, airspace and airport layout plan requirements... appropriate airspace finding has been made; and (c) The FAA Airport Layout Plan with respect to the project... airport design, construction and equipment standards and specifications contained in advisory circulars...

  3. 14 CFR Appendix A to Part 158 - Assurances

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... State and local laws and regulations. 4. Environmental, airspace and airport layout plan requirements... appropriate airspace finding has been made; and (c) The FAA Airport Layout Plan with respect to the project... airport design, construction and equipment standards and specifications contained in advisory circulars...

  4. 14 CFR Appendix A to Part 158 - Assurances

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... State and local laws and regulations. 4. Environmental, airspace and airport layout plan requirements... appropriate airspace finding has been made; and (c) The FAA Airport Layout Plan with respect to the project... airport design, construction and equipment standards and specifications contained in advisory circulars...

  5. The Business Education Curriculum.

    ERIC Educational Resources Information Center

    Selden, William H., Jr.

    The publication is designed to serve as a guide for those responsible for business education in Pennsylvania, emphasizing curriculum planning and the development of course guidelines. Chapter one deals with planning the business education program within the framework of the principles of curriculum construction. Program implementation at the…

  6. Baby MIND Experiment Construction Status

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Antonova, M.; et al.

    Baby MIND is a magnetized iron neutrino detector, with novel design features, and is planned to serve as a downstream magnetized muon spectrometer for the WAGASCI experiment on the T2K neutrino beam line in Japan. One of the main goals of this experiment is to reduce systematic uncertainties relevant to CP-violation searches, by measuring the neutrino contamination in the anti-neutrino beam mode of T2K. Baby MIND is currently being constructed at CERN, and is planned to be operational in Japan in October 2017.

  7. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications.

  8. Space and energy conservation housing prototype unit development

    NASA Technical Reports Server (NTRS)

    Sunshine, D. R.

    1975-01-01

    Construction plans are discussed for a house which will demonstrate the application of advanced technology to minimize energy requirements and to help direct further development in home construction by defining the interaction of integrated energy and water systems with building configuration and construction materials. Housing unit designs are provided and procedures for the analysis of a variety of housing strategies are developed.

  9. A lunar construction shack vehicle: Final design

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A lunar construction shack vehicle is a critical component in most of the plans proposed for the construction of a permanent base on the moon. The Selene Engineering Company (SEC) has developed a concept for this vehicle which is both innovative and practical. The design makes use of the most advanced technology available to meet the goals for a safe, versatile and durable habitat that will serve as a starting point for the initial phase of the construction of a permanent lunar base. This document outlines SEC's proposed design for a lander vehicle which will be fully self-sufficient and will provide for all necessary life support, including consumables and radiation protection, needed by the construction crew until they can complete the assembly of a more permanent habitat. Since it is highly likely that it will take more than one crew to complete the construction of a permanent lunar base, the design emphasis is on systems which can be easily maintained and resupplied and which will take a minimum of start up preparation by succeeding crews.

  10. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are projects administered? 170.471 Section 170.471 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and...

  11. KSC-2012-6405

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  12. KSC-2012-6404

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  13. Towards the 21st Century. Facilities for Tertiary Education.

    ERIC Educational Resources Information Center

    Corbett, Anne, Ed.

    This report presents observations of experts in planning, design, construction or management of tertiary educational facilities about the emerging issues and the appropriate planning and architectural solutions for higher education facilities as the new millennium approaches. Specific topics discuss the current context of tertiary education…

  14. 40 CFR 62.13108 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Industrial Solid Waste Incineration Units. The State Plan includes revisions to Rule 102 and Rule 405 of the... Industrial Solid Waste Incineration Units for which construction commenced on or before November 30, 1999... Control of Air Emissions of Designated Pollutants from Existing Commercial and Industrial Solid Waste...

  15. Science Facilities Design Guidelines.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    These guidelines, presented in five chapters, propose a framework to support the planning, designing, constructing, and renovating of school science facilities. Some program issues to be considered in the articulation of a science program include environmental concerns, interdisciplinary approaches, space flexibility, and electronic…

  16. 25 CFR Appendix B to Subpart D - Design Standards for the IRR Program

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Pt. 170... Local Roads (ADT less than or equal to 400). 7. FHWA Federal Lands Highway, Project Development and Design Manual. 8. FHWA Flexibility in Highway Design. 9. FHWA Roadside Improvements for Local Road and...

  17. 25 CFR Appendix B to Subpart D - Design Standards for the IRR Program

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Pt. 170... Local Roads (ADT less than or equal to 400). 7. FHWA Federal Lands Highway, Project Development and Design Manual. 8. FHWA Flexibility in Highway Design. 9. FHWA Roadside Improvements for Local Road and...

  18. 25 CFR 170.456 - When can a tribe request an exception from the design standards?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true When can a tribe request an exception from the design... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Design § 170.456 When can a tribe request an exception from the design standards? A...

  19. 25 CFR 170.456 - When can a tribe request an exception from the design standards?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false When can a tribe request an exception from the design... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Design § 170.456 When can a tribe request an exception from the design standards? A...

  20. 25 CFR 170.456 - When can a tribe request an exception from the design standards?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false When can a tribe request an exception from the design... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Design § 170.456 When can a tribe request an exception from the design standards? A...

  1. 25 CFR 170.456 - When can a tribe request an exception from the design standards?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false When can a tribe request an exception from the design... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Design § 170.456 When can a tribe request an exception from the design standards? A...

  2. 25 CFR 170.456 - When can a tribe request an exception from the design standards?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false When can a tribe request an exception from the design... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Design § 170.456 When can a tribe request an exception from the design standards? A...

  3. STUDY ON THE REDUCTION MEASURES OF ENVIRONMENTAL LOADS AT THE DESIGNING AND CONSTRUCTION STAGES OF THE RIVER WORKS

    NASA Astrophysics Data System (ADS)

    Ikeda, Tetsuya; Amano, Kunihiko; Kishida, Hiroyuki

    In the field of infrastructure construction including river works, construction materials such as concrete are used, and it needs to transport them for the long distance. Due to recent growth of public awareness on the environmental issues, it becomes more important to estimate and reduce the environmental loads brought by the infrastructure construction. In the infrastructure construction, it is necessary to take notice of carbon dioxide and waste materials as the broad-based and long-range environmental loads. On the other hand, it is necessary to conduct the quantitative evaluation on these environmental loads and to investigate the reduction measures by considering the actual situation of construction. Focusing on the river works, this paper estimates the cost of construction, the carbon dioxide emission and final disposal volume on the several alternative plans at the designing stage, compares the significance of different environmental loads by using the integrated factors of LIME2, and analyzes the effectiveness of reduction measures. It also establishes the reduction scenarios of the environmental loads, and analyzes the effectiveness compared to the base-line scenario in which the materials are newly extracted and produced. Based on the results, it establishes the procedure intending to reduce the environmental loads at the time of river planning and construction, which will be referentialized by river managers, construction consultants and constructors nationwide.

  4. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  5. Tribal Child Care Facilities: A Guide to Construction and Renovation.

    ERIC Educational Resources Information Center

    National Child Care Information Center, Vienna, VA.

    This document provides technical assistance in addressing major areas of the child care facility construction and renovation process, including conducting a child care community needs assessment, identifying a site, financing costs, developing a business plan, conducting an environmental assessment, building and designing a facility, and hiring…

  6. Preservation Concerns in Construction and Remodeling of Libraries: Planning for Preservation.

    ERIC Educational Resources Information Center

    Trinkley, Michael

    To help libraries and other holdings institutions better incorporate preservation concerns in construction, renovation, and routine maintenance, various techniques are presented that allow preservation concerns to be integrated. The following topics are considered: (1) site selection; (2) design of the building envelope; (3) the library interior;…

  7. 7 CFR 1737.50 - Review of completed loan application.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 3017); (3) A market survey called the Area Coverage Survey (ACS); (4) The plan and associated costs for the proposed construction, called the Loan Design (LD); (5) Evidence that the borrower is... determine that the system design is acceptable to RUS, that the design is technically correct, that the cost...

  8. 7 CFR 1737.50 - Review of completed loan application.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 3017); (3) A market survey called the Area Coverage Survey (ACS); (4) The plan and associated costs for the proposed construction, called the Loan Design (LD); (5) Evidence that the borrower is... determine that the system design is acceptable to RUS, that the design is technically correct, that the cost...

  9. 7 CFR 1737.50 - Review of completed loan application.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 3017); (3) A market survey called the Area Coverage Survey (ACS); (4) The plan and associated costs for the proposed construction, called the Loan Design (LD); (5) Evidence that the borrower is... determine that the system design is acceptable to RUS, that the design is technically correct, that the cost...

  10. 7 CFR 1737.50 - Review of completed loan application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 3017); (3) A market survey called the Area Coverage Survey (ACS); (4) The plan and associated costs for the proposed construction, called the Loan Design (LD); (5) Evidence that the borrower is... determine that the system design is acceptable to RUS, that the design is technically correct, that the cost...

  11. 7 CFR 1737.50 - Review of completed loan application.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 3017); (3) A market survey called the Area Coverage Survey (ACS); (4) The plan and associated costs for the proposed construction, called the Loan Design (LD); (5) Evidence that the borrower is... determine that the system design is acceptable to RUS, that the design is technically correct, that the cost...

  12. 25 CFR 170.457 - Can a tribe appeal a denial?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Design § 170.457 Can a tribe appeal a denial? Yes. If BIA denies a design exception request made by a tribe, the...

  13. 7 CFR 1470.24 - Payments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... participant associated with planning, design, materials, installation, labor, management, maintenance, or..., construction, or maintenance of animal waste storage or treatment facilities or associated waste transport or...

  14. Impact of Transportation on the Environment and Quality of Life.

    ERIC Educational Resources Information Center

    Schuster, James J.

    This paper discusses the changing role of civil engineers in developed nations. Transportation facilities generally follow a four phase approach before construction: long range systems planning, corridor location study, design location study, and final preparation of plans. Traditional engineering education emphasized the latter two phases but now…

  15. Industrial Marketing. Marketing and Distributive Education Curriculum Guide.

    ERIC Educational Resources Information Center

    Moore, James R.; And Others

    This guide is designed to provide the curriculum coordinator with a basis for planning a comprehensive program in the field of marketing as well as to provide marketing and distributive education teacher/coordinators with maximum flexibility in planning an industrial marketing curriculum. The guide was constructed by identifying the competencies…

  16. Marketing Services: Insurance. Marketing and Distributive Education Curriculum Guide.

    ERIC Educational Resources Information Center

    Luft, Roger L.; And Others

    This guide is designed to provide the curriculum coordinator with a basis for planning a comprehensive program in the field of marketing as well as to provide marketing and distributive education teacher/coordinators with maximum flexibility in planning an insurance marketing curriculum. The guide was constructed by identifying the competencies…

  17. 40 CFR 62.14350 - Scope and delegation of authority.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30... designated pollutants from certain municipal solid waste landfills in accordance with section 111(d) of the Clean Air Act and 40 CFR part 60, subpart B. This municipal solid waste landfills Federal plan applies...

  18. 40 CFR 62.14350 - Scope and delegation of authority.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30... designated pollutants from certain municipal solid waste landfills in accordance with section 111(d) of the Clean Air Act and 40 CFR part 60, subpart B. This municipal solid waste landfills Federal plan applies...

  19. 40 CFR 62.14350 - Scope and delegation of authority.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30... designated pollutants from certain municipal solid waste landfills in accordance with section 111(d) of the Clean Air Act and 40 CFR part 60, subpart B. This municipal solid waste landfills Federal plan applies...

  20. Design/build vs. traditional construction user delay modeling : an evaluation of the cost effectiveness of innovative construction methods for new construction. Part 1 : I-15 reconstruction in Davis County : evaluation of various traffic maintenance plans

    DOT National Transportation Integrated Search

    2007-05-01

    This paper evaluates impact of various I-15 reconstruction closure scenarios on the travelers in Ogden area. The purpose of the research was to investigate impact of the scenarios and facilitate decision about future maintenance of traffic during the...

  1. Impacts of Climate Variability and Change on Flood Frequency Analysis for Transportation Design

    DOT National Transportation Integrated Search

    2010-09-01

    Planning for construction of roads and bridges over rivers or floodplains includes a hydrologic analysis of rainfall amount and intensity : for a defined period. Infrastructure design must be based on accurate rainfall estimates how much (intensi...

  2. Decentralized Modular Systems Versus Centralized Systems.

    ERIC Educational Resources Information Center

    Crossey, R. E.

    Building design, planning, and construction programing for modular decentralized mechanical building systems are outlined in terms of costs, performance, expansion and flexibility. Design strategy, approach, and guidelines for implementing such systems for buildings are suggested, with emphasis on mechanical equipment and building element…

  3. History of Road Design Standards in LADOTD : Research Project Capsule

    DOT National Transportation Integrated Search

    2012-10-01

    According to the Louisiana Statewide Transportation Plan, Louisianas highway : network is comprised of over 60,000 miles, of which over 16,000 miles are : maintained by the state. The roadways were designed and constructed : according to the desig...

  4. Technotown: A LEGO Experience. [and] Technotown: A School-Wide Design Technology Project.

    ERIC Educational Resources Information Center

    Belch, Harry; Knobloch, Stephan F.

    1994-01-01

    Describes how 900 elementary students planned, designed, and constructed Technotown out of 1 million LEGO pieces. Presents a learning activity (objectives, materials, challenge, evaluation, and closing thoughts) on the building of a subway system for Technotown. (SK)

  5. How to Construct a Mixed Methods Research Design.

    PubMed

    Schoonenboom, Judith; Johnson, R Burke

    2017-01-01

    This article provides researchers with knowledge of how to design a high quality mixed methods research study. To design a mixed study, researchers must understand and carefully consider each of the dimensions of mixed methods design, and always keep an eye on the issue of validity. We explain the seven major design dimensions: purpose, theoretical drive, timing (simultaneity and dependency), point of integration, typological versus interactive design approaches, planned versus emergent design, and design complexity. There also are multiple secondary dimensions that need to be considered during the design process. We explain ten secondary dimensions of design to be considered for each research study. We also provide two case studies showing how the mixed designs were constructed.

  6. 7 CFR 1780.54 - Technical services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., Constructing and Inspections § 1780.54 Technical services. Owners are responsible for providing the engineering, architect and environmental services necessary for planning, designing, bidding, contracting, inspecting...

  7. Health sciences library building projects: 1994 survey.

    PubMed Central

    Ludwig, L

    1995-01-01

    Designing and building new or renovated space is time consuming and requires politically sensitive discussions concerning a number of both long-term and immediate planning issues. The Medical Library Association's fourth annual survey of library building projects identified ten health sciences libraries that are planning, expanding, or constructing new facilities. Two projects are in predesign stages, four represent new construction, and four involve renovations to existing libraries. The Texas Medical Association Library, the King Faisal Specialist Hospital and Research Centre Library, and the Northwestern University Galter Health Sciences Library illustrate how these libraries are being designed for the future and take into account areas of change produced by new information technologies, curricular trends, and new ways to deliver library services. Images PMID:7599586

  8. NASA Tech House: An early evaluation

    NASA Technical Reports Server (NTRS)

    1977-01-01

    An architect-engineering firm, as well as university participants, performed system studies, evaluated construction methods, performed cost effectiveness studies, and prepared construction drawings which incorporated the selected technology features into a final design. A Technology Utilization House (Tech House) based on this design was constructed at the NASA Langley Research Center in Hampton, Virginia. The Tech House is instrumented so that the performance of the design features and energy systems can be evaluated during a planned family live-in period. As such, the house is both a demonstration unit and a research laboratory. The Tech House is to demonstrate the kind of single-family residence that will probably be available within the next five years.

  9. Affordable passive solar homes - low-cost, compact designs. [Glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crowther, R.L.

    1984-01-01

    The designs and plans of this book present total, integrative, energy design. They carefully integrate site, architecture, and interior for various population segments that meet a frugal budget. The book is divided into two sections. The first part gives data concerning design, construction, site, climatic factors, materials, interiors, financing, and other home ownership factors that enhance affordability. Basic information on the design assumptions and considerations incorporate into the homes is presented, along with passive solar systems descriptions. The second part presents designs and plans with a brief review of considerations that serve defined human living needs, as well single-family, attached,more » or multiple residential configurations. The plans are based on a dimensional grid using 4-foot and 2-foot (1.2 meter and .61 meter) increments compatible with economic standard lumber and materials sizes.« less

  10. Determination of sustainable values for the parameters of the construction of residential buildings

    NASA Astrophysics Data System (ADS)

    Grigoreva, Larisa; Grigoryev, Vladimir

    2018-03-01

    For the formation of programs for housing construction and planning of capital investments, when developing the strategic planning companies by construction companies, the norms or calculated indicators of the duration of the construction of high-rise residential buildings and multifunctional complexes are mandatory. Determination of stable values of the parameters for the high-rise construction residential buildings provides an opportunity to establish a reasonable duration of construction at the planning and design stages of residential complexes, taking into account the influence of market conditions factors. The concept of the formation of enlarged models for the high-rise construction residential buildings is based on a real mapping in time and space of the most significant redistribution with their organizational and technological interconnection - the preparatory period, the underground part, the above-ground part, external engineering networks, landscaping. The total duration of the construction of a residential building, depending on the duration of each redistribution and the degree of their overlapping, can be determined by one of the proposed four options. At the same time, a unified approach to determining the overall duration of construction on the basis of the provisions of a streamlined construction organization with the testing of results on the example of high-rise residential buildings of the typical I-155B series was developed, and the coefficients for combining the work and the main redevelopment of the building were determined.

  11. Dismantling the theory of planned behavior: evaluating the relative effectiveness of attempts to uniquely change attitudes, norms, and perceived behavioral control.

    PubMed

    Montanaro, Erika A; Kershaw, Trace S; Bryan, Angela D

    2018-04-18

    The current study compares the effectiveness of interventions that attempted to uniquely influence hypothesized determinants of behavior in the Theory of Planned Behavior versus some optimal combination of constructs (three constructs vs. four) to increase condom use among intentions and behavior college students. 317 participants (M age  = 19.31; SD age  = 1.31; 53.3% female; 74.1% Caucasian) were randomly assigned to one of seven computer-based interventions. Interventions were designed using the Theory of Planned Behavior as the guiding theoretical framework. 196 (61.8%) completed behavioral follow-up assessments 3-month later. We found that the four construct intervention was marginally better at changing intentions (estimate = - .06, SE = .03, p = .06), but the single construct interventions were more strongly related to risky sexual behavior at follow-up (estimate = .04, SE = .02, p = .05). This study suggests that these constructs may work together synergistically to produce change (ClinicalTrials.gov Number NCT# 02855489).

  12. Optimization of Typological Requirements for Low-Cost Detached Houses

    NASA Astrophysics Data System (ADS)

    Kuráň, Jozef

    2017-09-01

    The presented paper deals with an analysis of the legislative, hygienic, functional and operational requirements for the design of detached houses and individual dwellings in terms of typological requirements. The article also presents a sociological survey about the preferences and subjective requirements of relevant public group segments in terms of living in a detached house or an individual dwelling. The aim of the paper is to define the possibilities for the optimization of typological requirements. The optimization methods are based on principles already applied to contemporary detached house preferences and trends. The main idea is to reduce the amount of floor space, thus lowering construction and operating costs. The goal is to design an optimized floor plan, while preserving the hygienic criteria for individual residential dwellings. By applying optimization methods, a so-called rationalized and conditioned floor plan results in an individual dwelling floor plan design that can be compared to a reference model with an accurate quantification comparison. The significant sources of research are the legislative and normative requirements in the field of house construction in Slovakia, the Czech Republic and abroad.

  13. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  14. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  15. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  16. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  17. 23 CFR 661.5 - What definitions apply to this regulation?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...

  18. Model Building.

    ERIC Educational Resources Information Center

    Day, C. William; Parsley, James

    1996-01-01

    Describes how school boards and administrators can use a facility-planning symposium, which brings together educators, students, parents, business leaders, and others, to establish an educational program and to design a template representative of the community. Examines ways to construct a shared vision and looks at design issues. (RJM)

  19. Fiscal Year (FY) 2001 Budget Estimates. Army National Guard. Military Construction Program FY 2001. Justification Data Submission to Congress. Department of the Army.

    DTIC Science & Technology

    2000-02-01

    CONSIDERATIONS ix-xx FUTURE YEARS DEFENSE PLAN AUDIT TRAIL xxi-xxiii PROJECT JUSTIFICATION DOCUMENTS 1-149 PLANNING & DESIGN JUSTIFICATION DOCUMENT 15 0...OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DDl°™1390s2 MAY 78 1. COMPONENT FY 2001 GUARD AND RESERVE 2. DATE ARNG MILITARY CONSTRUCTION FEB00 3...TOTAL 36 286 13 MAJOR EQUIPMENT AND AIRCRAFT TYPE AUTHORIZED ASSIGNED 14. OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DD:A O™1390S2 1

  20. The challenge of logistics facilities development

    NASA Technical Reports Server (NTRS)

    Davis, James R.

    1987-01-01

    The paper discusses the experiences of a group of engineers and logisticians at John F. Kennedy Space center in the design, construction and activation of a consolidated logistics facility for support of Space Transportation System ground operations and maintenance. The planning, methodology and processes are covered, with emphasis placed on unique aspects and lessons learned. The project utilized a progressive design, baseline and build concept for each phase of construction, with the Government exercising funding and configuration oversight.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herk, A.; Poerschke, A.; Beach, R.

    In 2012-2013, IBACOS worked with a builder, Brookfield Homes in Denver, Colorado, to design and construct a Passive House certified model home. IBACOS used several modeling programs and calculation methods to complete the final design package along with Brookfield's architect KGA Studio. This design package included upgrades to the thermal enclosure, basement insulation, windows, and heating, ventilation, and air conditioning. Short-term performance testing in the Passive House was done during construction and after construction. Testing with a blower door indicated that whole-building air leakage to the outside was 324 CFM and 0.60 ACH50. The other two test homes had littlemore » short-term testing done post-construction by the local energy rater. IBACOS then monitored the energy consumption and whole-house comfort conditions of that occupied Passive House after one year of operation and compared the monitoring results to those for two other occupied test houses in the same area with similar square footage but slightly different floor plans. IBACOS also assisted the builder, Brookfield Homes, in researching design scenarios for Zero Energy Ready Home and ENERGY STAR acceptance levels. IBACOS also assisted Brookfield in conceptualizing product for Denver's Brighton Heights area. Brookfield was considering building to Zero Energy Ready Home standards in that location. IBACOS provided strategies that Brookfield may draw from in the event the builder chooses to pursue a Zero Energy Ready Home plan for that market.« less

  2. PLANNING, PROGRAMMING, DESIGNING THE COMMUNITY COLLEGE, PROCEEDINGS OF A CONFERENCE SPONSORED BY THE COLLEGE OF ARCHITECTURE AND URBAN PLANNING AND THE CENTER FOR THE DEVELOPMENT OF COMMUNITY COLLEGE EDUCATION (UNIVERSITY OF WASHINGTON, APRIL 24-25, 1967).

    ERIC Educational Resources Information Center

    SONDALLE, MARVIN P.

    PARTICIPANTS AT THIS CONFERENCE DEFINED THE ESSENTIAL MAJOR STEPS IN FACILITY PLANNING FOR A NEW CAMPUS AS SITE SELECTION, FINANCIAL PROGRAMMING, CAMPUS PLANNING, AND CONSTRUCTION. THEY ALSO AGREED THAT THE COLLEGE ADMINISTRATION AND THE ARCHITECTURAL STAFF MUST WORK TOGETHER AT EVERY STAGE OF THE PROGRAM. PRESENT TECHNIQUES OF ENROLLMENT…

  3. Orbital construction demonstration study

    NASA Technical Reports Server (NTRS)

    1976-01-01

    A conceptual design and program plan for an Orbital Construction Demonstration Article (OCDA) was developed that can be used for evaluating and establishing practical large structural assembly operations. A flight plan for initial placement and continued utility is presented as a basic for an entirely new shuttle payload line-item having great future potential benefit for space applications. The OCDA is a three-axis stabilized platform in low-earth orbit with many structural nodals for mounting large construction and fabrication equipments. This equipment would be used to explore methods for constructing the large structures for future missions. The OCDA would be supported at regular intervals by the shuttle. Construction experiments and consumables resupply are performed during shuttle visit periods. A 250 kw solar array provides sufficient power to support the shuttle while attached to the OCDA and to run construction experiments at the same time. Wide band communications with a Telemetry and Data Relay Satellite compatible high gain antenna can be used between shuttle revisits to perform remote controlled, TV assisted construction experiments.

  4. Stair Types and Mathematics, Carpentry: 901896.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course for grades 11 and 12 designed to provide instruction in the layout and construction of various types of stairs. Students completing the course will be expected to have skills and knowledge of building construction plans, concrete forms, walls, roofs and doors, in addition to a basic knowledge of mathematics…

  5. Academic Building Systems. A Technique to Maximize Control of Construction Costs.

    ERIC Educational Resources Information Center

    Clark, Donald H.

    1972-01-01

    Academic Building Systems (ABS) is an architectural planning and design method which allows the construction owner to respond to the need for less expensive structures, economically adaptable to the changing conditions of the academic world, by providing the owner with the maximum controls over the variable cost factors in educational facility…

  6. [The construction of cast removable partial dentures with functional-effective structural elements].

    PubMed

    Hahn, P P

    1977-09-01

    In view of caries susceptibility and periodontal condition, oral examination (fig. 1) is of prime importance in treatment planning (fig. 2). Crownings as well as possibilities of direct and indirect stiffenings are explained from the viewpoints of construction and differential indication in connection with the design of the prosthesis.

  7. 30 CFR 77.216-5 - Water, sediment or slurry impoundments and impounding structures; abandonment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... are met: (1) A registered professional engineer, knowledgeable in the principles of dam design and in the design and construction of the structure, shall certify that it substantially conforms to the approved design plan and specifications and that there are no apparent defects. (2) The current owner or...

  8. 30 CFR 77.216-5 - Water, sediment or slurry impoundments and impounding structures; abandonment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... are met: (1) A registered professional engineer, knowledgeable in the principles of dam design and in the design and construction of the structure, shall certify that it substantially conforms to the approved design plan and specifications and that there are no apparent defects. (2) The current owner or...

  9. 25 CFR 170.454 - What design standards are used in the IRR Program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What design standards are used in the IRR Program? 170.454 Section 170.454 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  10. Nuclear Powerplant Safety: Design and Planning.

    ERIC Educational Resources Information Center

    Department of Energy, Washington, DC. Nuclear Energy Office.

    The most important concern in the design, construction and operation of nuclear powerplants is safety. Nuclear power is one of the major contributors to the nation's supply of electricity; therefore, it is important to assure its safe use. Each different type of powerplant has special design features and systems to protect health and safety. One…

  11. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  12. The Design, Planning and Control of Robotic Systems in Space

    NASA Technical Reports Server (NTRS)

    Dubowsky, Steven

    1996-01-01

    In the future, robotic systems will be expected to perform important tasks in space, in orbit and in planetary exploration. In orbit, current technology requires that tasks such as the repair, construction and maintenance of space stations and satellites be performed by astronaut Extra Vehicular Activity (EVA). Eliminating the need for astronaut EVA through the use of space manipulators would greatly reduce both mission costs and hazards to astronauts. In planetary exploration, cost and logistical considerations clearly make the use of autonomous and telerobotic systems also very attractive, even in cases where an astronaut explorer might be in the area. However, such applications introduce a number of technical problems not found in conventional earth-bound industrial robots. To design useful and practical systems to meet the needs of future space missions, substantial technical development is required, including in the areas of the design, control and planning. The objectives of this research program were to develop such design paradigms and control and planning algorithms to enable future space robotic systems to meet their proposed mission objectives. The underlying intellectual focus of the program is to construct a set of integrated design, planning and control techniques based on an understanding of the fundamental mechanics of space robotic systems. This work was to build upon the results obtained in our previous research in this area supported by NASA Langley Research Center in which we have made important contributions to the area of space robotics.

  13. Keys to Success: School Facilities Primer, Questions & Answers 101.

    ERIC Educational Resources Information Center

    Brady, Jim

    This publication provides answers to basic questions to help school board members more fully address the complexities of the planning, design, and construction process in order to maximize the goal of student success. The 101 questions and answers are in the areas of: facility planning; learning environment; information technology; safe schools;…

  14. Educational Trends Shaping School Planning, Design, Construction, Funding and Operation

    ERIC Educational Resources Information Center

    Stevenson, Kenneth R.

    2010-01-01

    What does the future hold for educators and facilities professionals when it comes to planning, building, funding, and operating school facilities? No one can absolutely know beforehand. However, there are many, many indicators of where public education in the United States may well be destined. These indicators take the form of already occurring…

  15. A Model for Talent Management and Career Planning

    ERIC Educational Resources Information Center

    Waheed, Sajjad; Zaim, A. Halim

    2015-01-01

    This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…

  16. A REVIEW OF STUDIES OF ECONOMIES IN SCHOOLHOUSE CONSTRUCTION.

    ERIC Educational Resources Information Center

    DOHERTY, LEO D.; WHEATLEY, ARTRELLE

    ECONOMIES IN PLANNING AND DESIGNING BEGIN WITH THE WISE CHOICE OF AN ARCHITECT. COMPLETE INFORMATION ON BUILDING NEEDS, ENROLLMENT PROJECTIONS, AND PROGRAM MUST BE AVAILABLE. INCLUSION OF MULTIPLE-USE ROOMS, MINIMAL PERIMETER WALLS, LOWERED CEILINGS, MINIMAL WASTE SPACE, MINIMAL USE OF GLASS, AND USE OF STOCK PLANS ARE CONCEPTS WHICH CAN EFFECT…

  17. Assessing problem-solving skills in construction education with the virtual construction simulator

    NASA Astrophysics Data System (ADS)

    Castronovo, Fadi

    The ability to solve complex problems is an essential skill that a construction and project manager must possess when entering the architectural, engineering, and construction industry. Such ability requires a mixture of problem-solving skills, ranging from lower to higher order thinking skills, composed of cognitive and metacognitive processes. These skills include the ability to develop and evaluate construction plans and manage the execution of such plans. However, in a typical construction program, introducing students to such complex problems can be a challenge, and most commonly the learner is presented with only part of a complex problem. To support this challenge, the traditional methodology of delivering design, engineering, and construction instruction has been going through a technological revolution, due to the rise of computer-based technology. For example, in construction classrooms, and other disciplines, simulations and educational games are being utilized to support the development of problem-solving skills. Previous engineering education research has illustrated the high potential that simulations and educational games have in engaging in lower and higher order thinking skills. Such research illustrated their capacity to support the development of problem-solving skills. This research presents evidence supporting the theory that educational simulation games can help with the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems. The educational simulation game employed in this study is the Virtual Construction Simulator (VCS). The VCS is a game developed to provide students in an engaging learning activity that simulates the planning and managing phases of a construction project. Assessment of the third iteration of the VCS(3) game has shown pedagogical value in promoting students' motivation and a basic understanding of construction concepts. To further evaluate the benefits on problem-solving skills, a new version of the VCS(4) was developed, with new building modules and assessment framework. The design and development of the VCS4 leveraged research in educational psychology, multimedia learning, human-computer interaction, and Building Information Modeling. In this dissertation the researcher aimed to evaluate the pedagogical value of the VCS4 in fostering problem-solving skills. To answer the research questions, a crossover repeated measures quasi-experiment was designed to assess the educational gains that the VCS can provide to construction education. A group of 34 students, attending a fourth-year construction course at a university in the United States was chosen to participate in the experiment. The three learning modules of the VCS were used, which challenged the students to plan and manage the construction process of a wooden pavilion, the steel erection of a dormitory, and the concrete placement of the same dormitory. Based on the results the researcher was able to provide evidence supporting the hypothesis that the chosen sample of construction students were able to gain and retain problem-solving skills necessary to solve complex construction simulation problems, no matter what the sequence with which these modules were played. In conclusion, the presented results provide evidence supporting the theory that educational simulation games can help the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems.

  18. Hiilangaay Hydroelectric Project – Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twitchell, Sara; Stimac, Michael; Lang, Lisa

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less

  19. 49 CFR Attachment 1 - Form and Content of Statement

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the particular level of decision making (planning, feasibility, design, etc.). In order to insure... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  20. 49 CFR Attachment 1 - Form and Content of Statement

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the particular level of decision making (planning, feasibility, design, etc.). In order to insure... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  1. 25 CFR 170.460 - What must a project package include?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....460 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Review... environmental, archeological, and cultural clearances; and (4) Identification of design exceptions if used in...

  2. 77 FR 14584 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... square yards). Modify supplemental wind cones. Runway 8/26 pavement rejuvenation. Purchase snow removal equipment--high-speed snow plow. Master plan/land use. Design passenger terminal remodel. Install runway... lighting and cable rehabilitation. Construct improvements of terminal building. Design reconstruction of...

  3. Building a Better Campus: An Update on Building Codes.

    ERIC Educational Resources Information Center

    Madden, Michael J.

    2002-01-01

    Discusses the implications for higher education institutions in terms of facility planning, design, construction, and renovation of the move from regionally-developed model-building codes to two international sets of codes. Also addresses the new performance-based design option within the codes. (EV)

  4. HYNOL PROCESS ENGINEERING: PROCESS CONFIGURATION, SITE PLAN, AND EQUIPMENT DESIGN

    EPA Science Inventory

    The report describes the design of the hydropyrolysis reactor system of the Hynol process. (NOTE: A bench scale methanol production facility is being constructed to demonstrate the technical feasibility of producing methanol from biomass using the Hynol process. The plant is bein...

  5. From Desire to Data: How JLab's Experimental Program Evolved Part 2: The Painstaking Transition to Concrete Plans, Mid-1980s to 1990

    NASA Astrophysics Data System (ADS)

    Westfall, Catherine

    2018-03-01

    This is the second in a three-part article describing the development of the Thomas Jefferson National Accelerator Facility's experimental program, from the first dreams of incisive electromagnetic probes into the structure of the nucleus through the era in which equipment was designed and constructed and a program crafted so that the long-desired experiments could begin. These developments unfolded against the backdrop of the rise of the more bureaucratic New Big Science and the intellectual tumult that grew from increasing understanding and interest in quark-level physics. Part 2, presented here, focuses on the period from 1986 to 1990. During this period of revolutionary change, laboratory personnel, potential users, and DOE officials labored to proceed from the 1986 laboratory design report, which included detailed accelerator plans and very preliminary experimental equipment sketches, to an approved 1990 experimental equipment conceptual design report, which provided designs complete enough for the onset of experimental equipment construction.

  6. 49 CFR 1520.3 - Terms used in this part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Statistics. Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer... conception, planning, design, construction, operation, or decommissioning phase. A vulnerability assessment...

  7. 49 CFR 1520.3 - Terms used in this part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Statistics. Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer... conception, planning, design, construction, operation, or decommissioning phase. A vulnerability assessment...

  8. 49 CFR 1520.3 - Terms used in this part.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Statistics. Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer... conception, planning, design, construction, operation, or decommissioning phase. A vulnerability assessment...

  9. 49 CFR 1520.3 - Terms used in this part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Statistics. Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer... conception, planning, design, construction, operation, or decommissioning phase. A vulnerability assessment...

  10. 49 CFR 1520.3 - Terms used in this part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Statistics. Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer... conception, planning, design, construction, operation, or decommissioning phase. A vulnerability assessment...

  11. Correlation of causal factors that influence construction safety performance: A model.

    PubMed

    Rodrigues, F; Coutinho, A; Cardoso, C

    2015-01-01

    The construction sector has presented positive development regarding the decrease in occupational accident rates in recent years. Regardless, the construction sector stands out systematically from other industries due to its high number of fatalities. The aim of this paper is to deeply understand the causality of construction accidents from the early design phase through a model. This study reviewed several research papers presenting various analytical models that correlate the contributing factors to occupational accidents in this sector. This study also analysed different construction projects and conducted a survey of design and site supervision teams. This paper proposes a model developed from the analysis of existing ones, which correlates the causal factors through all the construction phases. It was concluded that effective risk prevention can only be achieved by a global correlation of causal factors including not only production ones but also client requirements, financial climate, design team competence, project and risk management, financial capacity, health and safety policy and early planning. Accordingly, a model is proposed.

  12. Design and application of BIM based digital sand table for construction management

    NASA Astrophysics Data System (ADS)

    Fuquan, JI; Jianqiang, LI; Weijia, LIU

    2018-05-01

    This paper explores the design and application of BIM based digital sand table for construction management. Aiming at the demands and features of construction management plan for bridge and tunnel engineering, the key functional features of digital sand table should include three-dimensional GIS, model navigation, virtual simulation, information layers, and data exchange, etc. That involving the technology of 3D visualization and 4D virtual simulation of BIM, breakdown structure of BIM model and project data, multi-dimensional information layers, and multi-source data acquisition and interaction. Totally, the digital sand table is a visual and virtual engineering information integrated terminal, under the unified data standard system. Also, the applications shall contain visual constructing scheme, virtual constructing schedule, and monitoring of construction, etc. Finally, the applicability of several basic software to the digital sand table is analyzed.

  13. Reports of coal’s terminal decline may be exaggerated

    NASA Astrophysics Data System (ADS)

    Edenhofer, Ottmar; Steckel, Jan Christoph; Jakob, Michael; Bertram, Christoph

    2018-02-01

    We estimate the cumulative future emissions expected to be released by coal power plants that are currently under construction, announced, or planned. Even though coal consumption has recently declined and plans to build new coal-fired capacities have been shelved, constructing all these planned coal-fired power plants would endanger national and international climate targets. Plans to build new coal-fired power capacity would likely undermine the credibility of some countries’ (Intended) Nationally Determined Contributions submitted to the UNFCCC. If all the coal-fired power plants that are currently planned were built, the carbon budget for reaching the 2 °C temperature target would nearly be depleted. Propositions about ‘coal’s terminal decline’ may thereby be premature. The phase-out of coal requires dedicated and well-designed policies. We discuss the political economy of policy options that could avoid a continued build-up of coal-fired power plants.

  14. Planning Marine Reserve Networks for Both Feature Representation and Demographic Persistence Using Connectivity Patterns

    PubMed Central

    Bode, Michael; Williamson, David H.; Weeks, Rebecca; Jones, Geoff P.; Almany, Glenn R.; Harrison, Hugo B.; Hopf, Jess K.; Pressey, Robert L.

    2016-01-01

    Marine reserve networks must ensure the representation of important conservation features, and also guarantee the persistence of key populations. For many species, designing reserve networks is complicated by the absence or limited availability of spatial and life-history data. This is particularly true for data on larval dispersal, which has only recently become available. However, systematic conservation planning methods currently incorporate demographic processes through unsatisfactory surrogates. There are therefore two key challenges to designing marine reserve networks that achieve feature representation and demographic persistence constraints. First, constructing a method that efficiently incorporates persistence as well as complementary feature representation. Second, incorporating persistence using a mechanistic description of population viability, rather than a proxy such as size or distance. Here we construct a novel systematic conservation planning method that addresses both challenges, and parameterise it to design a hypothetical marine reserve network for fringing coral reefs in the Keppel Islands, Great Barrier Reef, Australia. For this application, we describe how demographic persistence goals can be constructed for an important reef fish species in the region, the bar-cheeked trout (Plectropomus maculatus). We compare reserve networks that are optimally designed for either feature representation or demographic persistence, with a reserve network that achieves both goals simultaneously. As well as being practically applicable, our analyses also provide general insights into marine reserve planning for both representation and demographic persistence. First, persistence constraints for dispersive organisms are likely to be much harder to achieve than representation targets, due to their greater complexity. Second, persistence and representation constraints pull the reserve network design process in divergent directions, making it difficult to efficiently achieve both constraints. Although our method can be readily applied to the data-rich Keppel Islands case study, we finally consider the factors that limit the method’s utility in information-poor contexts common in marine conservation. PMID:27168206

  15. Planning and design considerations in karst terrain

    NASA Astrophysics Data System (ADS)

    Fischer, J. A.; Greene, R. W.; Ottoson, R. S.; Graham, T. C.

    1988-10-01

    This article discusses the various steps that the authors feel are necessary to the successful progression of an engineered project sited in karst terrain. The procedures require a multidisciplined approach with liaison and cooperation among the various parties to the project. Initially, the prospective owner must have sufficient understanding of the potential engineering problems to incorporate the engineering geologist into the early stages of any planned acquisition. The first step in an investigation should include a review of the available geologic information, aerial photo interpretation, consultation with the State Geological Survey, and a geologic reconnaissance of the prospective site and surrounding area. A go-no-go decision as to purchase can often been made at an early time. Although, in some instances, more study is needed for a particularly intriguing property. The second stage should consider the various planning alternatives that are feasible based upon the limited available information. At this stage planning/purchase decisions can be made as to purchasing options, value of the property, design constraints, and the possible economic penalties that could be associated with the potential site construction. Various planning and construction alternatives should be considered in this phase of the work. The third stage should include a site investigation program of moderate size, consisting of test pits and/or exploratory borings. The borings should be drilled using water as the drilling fluid, with an experienced crew and qualified technical inspection. The authors find the use of geophysical techniques can be extremely misleading unless used in conjunction with exploratory drilling. Successful evaluations using geophysical procedures occur only under ideal conditions. The geotechnical viability of the plan and preliminary design should be investigated in the fourth phase. Additionally, the physical parameters required for the design of structures founded atop cavities can be obtained at this time. Several support schemes which incorporate cavity roof thickness, rock strength, and cavity space are discussed. Possible construction procedures include excavation and dental concrete, grouting, piers or piles to sound rock, or moving to another area. The relative economies of these procedures are discussed in relation to the size and depth of the soil or rock cavity, possible future cavity formation, magnitude of loading and acceptable safety factors.

  16. Designing health insurance market constructs for shared responsibility: insights from California.

    PubMed

    Curtis, Rick; Neuschler, Ed

    2009-01-01

    Moving toward universal participation in health insurance using a "shared responsibility" approach requires new, more accessible, and more efficient ways for people who are not offered employer coverage to obtain coverage. California's recent health reform plan-which failed to pass-incorporated individual market reform and choice-pool constructs to achieve critically important risk spreading, assure solvency, and reduce cost shifts. These measures, as well as the considerations that led to their design, offer important insights for health reform at the federal level.

  17. 49 CFR 15.3 - Terms used in this part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer Program under... interference, whether during the conception, planning, design, construction, operation, or decommissioning...

  18. 49 CFR 15.3 - Terms used in this part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer Program under... interference, whether during the conception, planning, design, construction, operation, or decommissioning...

  19. 49 CFR 15.3 - Terms used in this part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer Program under... interference, whether during the conception, planning, design, construction, operation, or decommissioning...

  20. 49 CFR 15.3 - Terms used in this part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer Program under... interference, whether during the conception, planning, design, construction, operation, or decommissioning...

  1. 49 CFR 15.3 - Terms used in this part.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... Federal Flight Deck Officer means a pilot participating in the Federal Flight Deck Officer Program under... interference, whether during the conception, planning, design, construction, operation, or decommissioning...

  2. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    NASA Astrophysics Data System (ADS)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  3. Building the U.S. First Offshore Wind Farm-Applying EBM Approaches to Successfully Address Offshore Energy, Commercial Fisheries, and Recreational Boating interactions

    NASA Astrophysics Data System (ADS)

    Lipsky, A.

    2016-12-01

    In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.

  4. Building the U.S. First Offshore Wind Farm-Applying EBM Approaches to Successfully Address Offshore Energy, Commercial Fisheries, and Recreational Boating interactions

    NASA Astrophysics Data System (ADS)

    Lipsky, A.

    2016-02-01

    In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.

  5. 49 CFR Attachment 1 to Part 520 - Form and Content of Statement

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  6. 49 CFR Attachment 1 to Part 520 - Form and Content of Statement

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  7. 49 CFR 520.34 - Comments on environmental statements prepared by other agencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  8. 49 CFR Attachment 1 to Part 520 - Form and Content of Statement

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  9. 49 CFR 520.34 - Comments on environmental statements prepared by other agencies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (planning, feasibility, design, etc.). In order to insure accurate descriptions and environmental... construction; alternatives related to different locations or designs or details of the proposed action which... detailed to reveal comparative evaluation of the environmental benefits, costs, and risks of the proposed...

  10. 76 FR 28925 - Tribal Veterans Cemetery Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-19

    ... means the process of site selection, land acquisition, design and planning, earth moving, landscaping... space, or functional layout; and it will not enter into a construction contract for the project or... State or Tribal Organization and the design team to provide a standard for preparation of drawings...

  11. 75 FR 65551 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... at a $3.00 PFC Level: New terminal development schematic preliminary engineering study and design... for Collection and Use: Air carrier apron. Pavement condition inventory. New terminal building... construction. De-icing treatment plant. Domestic water service. CTX design and installation. Landside planning...

  12. Design and application of electromechanical actuators for deep space missions

    NASA Technical Reports Server (NTRS)

    Haskew, Tim A.; Wander, John

    1995-01-01

    This third semi-annual progress report covers the reporting period from August 16, 1994 through February 15, 1995 on NASA Grant NAG8-240, 'Design and Application of Electromechanical Actuators for Deep Space Missions'. There are two major report sections: Motor Control Status/Electrical Experiment Planning and Experiment Planning and Initial Results. The primary emphasis of our efforts during the reporting period has been final construction and testing of the laboratory facilities. As a result, this report is dedicated to that topic.

  13. 40 CFR Table 3 to Subpart Ggg of... - Generic Compliance Schedule and Increments of Progress a

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or Reconstructed Since May 30, 1991... rate report showing NMOC emissions ≥ 50 Mg/yr.b Increment 3—Begin on-site construction 24 months after...

  14. 40 CFR Table 3 to Subpart Ggg of... - Generic Compliance Schedule and Increments of Progress a

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or Reconstructed Since May 30, 1991... rate report showing NMOC emissions ≥ 50 Mg/yr.b Increment 3—Begin on-site construction 24 months after...

  15. The results of a limited study of approaches to the design, fabrication, and testing of a dynamic model of the NASA IOC space station. Executive summary

    NASA Technical Reports Server (NTRS)

    Brooks, George W.

    1985-01-01

    The options for the design, construction, and testing of a dynamic model of the space station were evaluated. Since the definition of the space station structure is still evolving, the Initial Operating Capacity (IOC) reference configuration was used as the general guideline. The results of the studies treat: general considerations of the need for and use of a dynamic model; factors which deal with the model design and construction; and a proposed system for supporting the dynamic model in the planned Large Spacecraft Laboratory.

  16. Design package for instrumentation of the Decade 80 house in Tucson, Arizona

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A design package covering instrumentation and system design for the Decade 80 House in Tucson, Arizona is presented. The solar house is instrumented for the purpose of gathering data to determine the solar heating and cooling system performance. The use of copper in the construction of the house is a first choice construction material because it conducts heat and resists corrosion better than other materials and therefore provides a more efficient and economical system. Equipment and site specifications are reported, along with floor plans showing the location of the site instrumentation hardware.

  17. Computational Support for Teachers' Design Thinking: Its Feasibility and Acceptability to Practitioners and Institutions

    ERIC Educational Resources Information Center

    Masterman, Elizabeth; Walker, Simon; Bower, Matt

    2013-01-01

    A significant area of learning design research has been the development of software applications that guide teachers' thinking as they plan, construct and revise learning events for their students. In this paper, we review conceptualisations of, and approaches to, the activity of pedagogic design and highlight the implications for the provision of…

  18. 25 CFR 170.463 - What should the Secretary do if a design deficiency is identified?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What should the Secretary do if a design deficiency is identified? 170.463 Section 170.463 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  19. DESIGN GUIDELINES FOR GOOD HEARING CONDITIONS AND EFFECTIVE NOISE CONTROL IN SCHOOL CLASSROOMS.

    ERIC Educational Resources Information Center

    KINGSBURY, H.F.; TAYLOR, D.W.

    TWO OF THE MOST IMPORTANT OPERATIVE DESIGN FACTORS GOVERNING SPEECH PERCEPTION IN CLASSROOMS HAVE BEEN EXAMINED AND GUIDELINES IN THE FORM OF GRAPHS, ETC. CONSTRUCTED THAT SHOULD BE UNDERSTANDABLE TO AND USABLE BY THOSE ASSOCIATED WITH SCHOOL PLANNING AND DESIGN. THE TWO FACTORS CONSIDERED ARE--(1) PROVISION FOR OPTIMUM REVERBERATION TIME, AND (2)…

  20. Timing Is Everything.

    ERIC Educational Resources Information Center

    Brunner, Patrick M.; Shelley, Kevin D.

    2001-01-01

    In school construction projects a great deal of work and planning needs to happen before ground breaking starts. Lists consistent factors that should always be considered when setting up a facility-design timeline. (MLF)

  1. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  2. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  3. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  4. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  5. 23 CFR 650.207 - Plans, specifications and estimates.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects... highway project designs for the control of erosion and sedimentation and the protection of water quality...

  6. Earthworks logistics in the high density urban development conditions - case study

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Blajer, M.

    2017-10-01

    Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.

  7. Gen Y Recruitment: Understanding Graduate Intentions to Join an Organisation Using the Theory of Planned Behaviour

    ERIC Educational Resources Information Center

    Warmerdam, Amanda; Lewis, Ioni; Banks, Tamara

    2015-01-01

    Purpose: Using the Theory of Planned Behaviour (TPB) framework, the purpose of this paper is to explore whether the standard TPB constructs explained variance in Generation Y (Gen Y) individuals' intentions to join their ideal organisation. Design/methodology/approach: A mixed methods approach was used featuring qualitative and quantitative…

  8. Discussion on design and stress checking of cast-in-place bracket

    NASA Astrophysics Data System (ADS)

    Xi, Tang Xian; Yong, He; Hu, Sun Shuan

    2018-04-01

    The cast-in-place bracket is the main support structure in the construction of bridge. Its strength, stiffness and stability have a direct impact on the quality and the safety of bridge construction. The design and calculation of the bracket in the prestressed concrete box girder are analyzed in this paper. The models including Bailey beam, steel crossbeam and steel columns are established by the finite element software. The strength, stiffness and stability of each model under the most unfavorable load are analyzed by MIDAS Civil. The analysis results verify that the support plan meets the relevant specifications and construction requirements. The feasibility of the support scheme was verified well accordingly. The paper can provide reference and guidance for similar engineering construction.

  9. Specific features of modern multifunctional high-rise building construction

    NASA Astrophysics Data System (ADS)

    Manukhina, Lyubov; Samosudova, Natal'ja

    2018-03-01

    The article analyzes the main reasons for the development of high-rise building construction the most important of which-is a limitation of the urban areas and, consequently, the high price of land reserved for construction. New engineering and compositional solutions for the creation of new types of buildings are considered - complex technical designs of a large number of storeys completely meet the new requirements for safety and comfort. Some peculiarities of designing high-rise buildings and searching for optimal architectural and planning solutions are revealed since, with external architectural simplicity, high-rise buildings have complex structural and technological and space-planning solutions. We consider the specific features of a high-rise housing in various countries around the world, including Russia, such as the layout of the multi-storey residential buildings, depending on the climatic characteristics of the regions, assessment of the geological risk of the construction site, the choice of parameters and functional purpose of the sections of the territory of high-rise construction, location of the town-planning object for substantiating the overall dimensions of the building, assessment of changes aeration and engineering and hydrological conditions of the site. A special place in the article on the problems of improvement of the territory, the device of courtyards, landscaping, the device of playing and sports grounds. The main conclusion in the article is the following problem - when developing high-rise housing construction, the development of high-rise housing, and an increase in the population density in the territory of large cities of Russia, necessary to create a comfortable and safe level of residents living and not a decrease, but an improvement in the quality of the urban environment.

  10. 36 CFR 230.37 - State priority plan-educational assistance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Activities; (2) Events; (3) Programs; (4) Curriculum; (5) Written materials; (6) Workshops; (7) Training sessions; (8) Web site construction and maintenance; or (9) Similar activities designed to bring landowners...

  11. 36 CFR 230.37 - State priority plan-educational assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Activities; (2) Events; (3) Programs; (4) Curriculum; (5) Written materials; (6) Workshops; (7) Training sessions; (8) Web site construction and maintenance; or (9) Similar activities designed to bring landowners...

  12. AMATS FY 1997-2000 Transportation Improvement Program

    DOT National Transportation Integrated Search

    1996-06-26

    Planning, design and construction of major transportation capital : investment projects, such as major highway relocations and transit service expansions, are costly and time-consuming. Even relatively minor improvements require substantial investmen...

  13. Design and application of electromechanical actuators for deep space missions

    NASA Technical Reports Server (NTRS)

    Haskew, Tim A.; Wander, John

    1994-01-01

    This progress report documents research and development efforts performed from August 16, 1993 through August 15, 1994 on NASA Grant NAG8-240, 'Design and Application of Electromechanical Actuators for Deep Space Missions.' Since the submission of our last progress report in February 1994, our efforts have been almost entirely focused on final construction of the test stand and experiment design. Hence, this report is dedicated solely to these topics. However, updates on our research personnel and our health monitoring and fault management efforts are provided in this summary. Following this executive summary are two report sections. The first is devoted to the motor drive being constructed for the test stand. The thrust of the next section is the mechanical and hydraulic design and construction based on the planned experimental requirements. Following both major sections are three appendices.

  14. Optimization of the scheme for natural ecology planning of urban rivers based on ANP (analytic network process) model.

    PubMed

    Zhang, Yichuan; Wang, Jiangping

    2015-07-01

    Rivers serve as a highly valued component in ecosystem and urban infrastructures. River planning should follow basic principles of maintaining or reconstructing the natural landscape and ecological functions of rivers. Optimization of planning scheme is a prerequisite for successful construction of urban rivers. Therefore, relevant studies on optimization of scheme for natural ecology planning of rivers is crucial. In the present study, four planning schemes for Zhaodingpal River in Xinxiang City, Henan Province were included as the objects for optimization. Fourteen factors that influenced the natural ecology planning of urban rivers were selected from five aspects so as to establish the ANP model. The data processing was done using Super Decisions software. The results showed that important degree of scheme 3 was highest. A scientific, reasonable and accurate evaluation of schemes could be made by ANP method on natural ecology planning of urban rivers. This method could be used to provide references for sustainable development and construction of urban rivers. ANP method is also suitable for optimization of schemes for urban green space planning and design.

  15. 23 CFR 970.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... planning, design, construction, maintenance, and operations. (c) The SMS shall be designed to fit the NPS... for the collection, maintenance and reporting of a data base that includes: (i) Accident records with... standards) for low volume roads may be tailored to be consistent with the functional classification of the...

  16. 40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the actual reasonable and necessary costs for preparing the pre-bid package. (4) Post-construction... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to...

  17. 40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the actual reasonable and necessary costs for preparing the pre-bid package. (4) Post-construction... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to...

  18. 40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the actual reasonable and necessary costs for preparing the pre-bid package. (4) Post-construction... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to...

  19. Design Criteria for Microbiological Facilities at Fort Detrick. Volume I: Introduction.

    ERIC Educational Resources Information Center

    Army Biological Labs., Fort Detrick, MD. Industrial Health and Safety Div.

    Volume I of a two volume manual serves as an introduction to design criteria for microbiological facilities. It is addressed to management personnel responsible for planning, budgeting, and making policy decisions for construction or remodeling of microbiological research laboratories. This volume is also concerned with--(1) microbiological safety…

  20. 40 CFR 62.14353 - Standards for municipal solid waste landfill emissions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Standards for municipal solid waste... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to... municipal solid waste landfill emissions. (a) The owner or operator of a designated facility having a design...

  1. 40 CFR 62.14353 - Standards for municipal solid waste landfill emissions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Standards for municipal solid waste... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to... municipal solid waste landfill emissions. (a) The owner or operator of a designated facility having a design...

  2. 40 CFR 62.14353 - Standards for municipal solid waste landfill emissions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Standards for municipal solid waste... municipal solid waste landfill emissions. (a) The owner or operator of a designated facility having a design...

  3. The building blocks of a 'Liveable Neighbourhood': Identifying the key performance indicators for walking of an operational planning policy in Perth, Western Australia.

    PubMed

    Hooper, Paula; Knuiman, Matthew; Foster, Sarah; Giles-Corti, Billie

    2015-11-01

    Planning policy makers are requesting clearer guidance on the key design features required to build neighbourhoods that promote active living. Using a backwards stepwise elimination procedure (logistic regression with generalised estimating equations adjusting for demographic characteristics, self-selection factors, stage of construction and scale of development) this study identified specific design features (n=16) from an operational planning policy ("Liveable Neighbourhoods") that showed the strongest associations with walking behaviours (measured using the Neighbourhood Physical Activity Questionnaire). The interacting effects of design features on walking behaviours were also investigated. The urban design features identified were grouped into the "building blocks of a Liveable Neighbourhood", reflecting the scale, importance and sequencing of the design and implementation phases required to create walkable, pedestrian friendly developments. Copyright © 2015 Elsevier Ltd. All rights reserved.

  4. Design and construction of an impulse turbine

    NASA Astrophysics Data System (ADS)

    Hernández, E.

    2013-11-01

    Impulse turbine has been constructed to be used in the program of Hydraulic Machines, Faculty of Mechanical Engineering at the Universidad Pontificia Bolivariana, sede Bucaramanga. For construction of the impulse turbine (Pelton) detailed plans were drawn up taking into account the design and implementation of the fundamental equations of hydraulic turbomachinery. From the experimental data found maximum mechanical efficiency of 0.6 ± 0.03 for a water flow of 2.1 l/s. The maximum overall efficiency was 0.23 ± 0.02 for a water flow of 0.83 l/s. The design parameter used was a power of 1 kW, as flow regulator built a needle type regulator, which performed well, the model of the bucket or vane is built on a machine type CNC (Computer Numerical Control). For the construction of the impeller and blades was used aluminium because of chemical and physical characteristics and the casing was manufactured in acrylic.

  5. Earth retaining structures manual

    DOT National Transportation Integrated Search

    2009-10-29

    The objectives of this policy are to obtain statewide uniformity, establish standard : procedures and delineate responsibility for the preparation and review of plans, : design and construction control of earth retaining structures. In addition, it i...

  6. Planning for Tornados.

    ERIC Educational Resources Information Center

    Napier, Erv; Pritchard, Janet

    1981-01-01

    Tornadoes are a very real threat to many schools. Planners should be aware of a number of design and construction considerations that will help to insure safe spaces for school children and other occupants. (Author/MLF)

  7. 44 CFR 60.23 - Planning considerations for mudslide (i.e., mudflow)-prone areas.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... open space; (d) The means of adjusting to the hazard, including the (1) establishment by ordinance of site exploration, investigation, design, grading, construction, filing, compacting, foundation...

  8. 44 CFR 60.23 - Planning considerations for mudslide (i.e., mudflow)-prone areas.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... open space; (d) The means of adjusting to the hazard, including the (1) establishment by ordinance of site exploration, investigation, design, grading, construction, filing, compacting, foundation...

  9. 44 CFR 60.23 - Planning considerations for mudslide (i.e., mudflow)-prone areas.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... open space; (d) The means of adjusting to the hazard, including the (1) establishment by ordinance of site exploration, investigation, design, grading, construction, filing, compacting, foundation...

  10. 44 CFR 60.23 - Planning considerations for mudslide (i.e., mudflow)-prone areas.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... open space; (d) The means of adjusting to the hazard, including the (1) establishment by ordinance of site exploration, investigation, design, grading, construction, filing, compacting, foundation...

  11. 44 CFR 60.23 - Planning considerations for mudslide (i.e., mudflow)-prone areas.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... open space; (d) The means of adjusting to the hazard, including the (1) establishment by ordinance of site exploration, investigation, design, grading, construction, filing, compacting, foundation...

  12. 40 CFR Table 4 to Subpart Ggg of... - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or Reconstructed Since May...

  13. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    ERIC Educational Resources Information Center

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  14. Pydna: a simulation and documentation tool for DNA assembly strategies using python.

    PubMed

    Pereira, Filipa; Azevedo, Flávio; Carvalho, Ângela; Ribeiro, Gabriela F; Budde, Mark W; Johansson, Björn

    2015-05-02

    Recent advances in synthetic biology have provided tools to efficiently construct complex DNA molecules which are an important part of many molecular biology and biotechnology projects. The planning of such constructs has traditionally been done manually using a DNA sequence editor which becomes error-prone as scale and complexity of the construction increase. A human-readable formal description of cloning and assembly strategies, which also allows for automatic computer simulation and verification, would therefore be a valuable tool. We have developed pydna, an extensible, free and open source Python library for simulating basic molecular biology DNA unit operations such as restriction digestion, ligation, PCR, primer design, Gibson assembly and homologous recombination. A cloning strategy expressed as a pydna script provides a description that is complete, unambiguous and stable. Execution of the script automatically yields the sequence of the final molecule(s) and that of any intermediate constructs. Pydna has been designed to be understandable for biologists with limited programming skills by providing interfaces that are semantically similar to the description of molecular biology unit operations found in literature. Pydna simplifies both the planning and sharing of cloning strategies and is especially useful for complex or combinatorial DNA molecule construction. An important difference compared to existing tools with similar goals is the use of Python instead of a specifically constructed language, providing a simulation environment that is more flexible and extensible by the user.

  15. Demonstration of a Spoken Dialogue Interface for Planning Activities of a Semi-autonomous Robot

    NASA Technical Reports Server (NTRS)

    Dowding, John; Frank, Jeremy; Hockey, Beth Ann; Jonsson, Ari; Aist, Gregory

    2002-01-01

    Planning and scheduling in the face of uncertainty and change pushes the capabilities of both planning and dialogue technologies by requiring complex negotiation to arrive at a workable plan. Planning for use of semi-autonomous robots involves negotiation among multiple participants with competing scientific and engineering goals to co-construct a complex plan. In NASA applications this plan construction is done under severe time pressure so having a dialogue interface to the plan construction tools can aid rapid completion of the process. But, this will put significant demands on spoken dialogue technology, particularly in the areas of dialogue management and generation. The dialogue interface will need to be able to handle the complex dialogue strategies that occur in negotiation dialogues, including hypotheticals and revisions, and the generation component will require an ability to summarize complex plans. This demonstration will describe a work in progress towards building a spoken dialogue interface to the EUROPA planner for the purposes of planning and scheduling the activities of a semi-autonomous robot. A prototype interface has been built for planning the schedule of the Personal Satellite Assistant (PSA), a mobile robot designed for micro-gravity environments that is intended for use on the Space Shuttle and International Space Station. The spoken dialogue interface gives the user the capability to ask for a description of the plan, ask specific questions about the plan, and update or modify the plan. We anticipate that a spoken dialogue interface to the planner will provide a natural augmentation or alternative to the visualization interface, in situations in which the user needs very targeted information about the plan, in situations where natural language can express complex ideas more concisely than GUI actions, or in situations in which a graphical user interface is not appropriate.

  16. [Perception and attitude of rural community to the construction of Asian elephant conservation corridors in Xishuangbanna].

    PubMed

    Li, Zheng-Ling; Chen, Ming-Yong; Wu, Zhao-Lu; Wang, Qian; Dong, Yong-Hua

    2009-06-01

    By using contingent valuation method (CVM), an investigation was made from November 2007 to March 2008 on the perception and attitude of 196 households in 5 villages within 2 planned Asian elephant conservation corridors in Xishuangbanna to the construction of the corridors. 80.61% of the interviewees conditionally supported the corridors construction. The main factors affecting the interviewees' support willingness included their education level, per capita income, and perceptions to Asian elephant protection, human-elephant relations, and corridor utilization patterns and its beneficiaries, among which, the interviewees' awareness of Asian elephant conservation, corridor utilization patterns, and corridor beneficiaries had strong influence on the support willingness, with the correlation coefficient being 0.231, 0.236, and -0.304, respectively. The rural community holding the land tenure played a key role in the corridors construction. To effectively design and planning the construction of biological conservation corridor, it is necessary to have a deep understanding on the perceptions and attitudes of rural community to the construction of the corridor and to obtain their support and participation for this construction.

  17. Deployable bamboo structure project: A building life-cycle report

    NASA Astrophysics Data System (ADS)

    Firdaus, Adrian; Prastyatama, Budianastas; Sagara, Altho; Wirabuana, Revian N.

    2017-11-01

    Bamboo is considered as a sustainable material in the world of construction, and it is vastly available in Indonesia. The general utilization of the material is increasingly frequent, however, its usage as a deployable structure-a recently-developed use of bamboo, is still untapped. This paper presents a report on a deployable bamboo structure project, covering the entire building life-cycle phase. The cycle encompasses the designing; fabrication; transportation; construction; operation and maintenance; as well as a plan for future re-use. The building is made of a configuration of the structural module, each being a folding set of bars which could be reduced in size to fit into vehicles for easy transportation. Each structural module was made of Gigantochloa apus bamboo. The fabrication, transportation, and construction phase require by a minimum of three workers. The fabrication and construction phase require three hours and fifteen minutes respectively. The building is utilized as cafeteria stands, the operation and maintenance phase started since early March 2017. The maintenance plan is scheduled on a monthly basis, focusing on the inspection of the locking mechanism element and the entire structural integrity. The building is designed to allow disassembly process so that it is reusable in the future.

  18. Structural and Functional Concepts in Current Mouse Phenotyping and Archiving Facilities

    PubMed Central

    Kollmus, Heike; Post, Rainer; Brielmeier, Markus; Fernández, Julia; Fuchs, Helmut; McKerlie, Colin; Montoliu, Lluis; Otaegui, Pedro J; Rebelo, Manuel; Riedesel, Hermann; Ruberte, Jesús; Sedlacek, Radislav; de Angelis, Martin Hrabě; Schughart, Klaus

    2012-01-01

    Collecting and analyzing available information on the building plans, concepts, and workflow from existing animal facilities is an essential prerequisite for most centers that are planning and designing the construction of a new animal experimental research unit. Here, we have collected and analyzed such information in the context of the European project Infrafrontier, which aims to develop a common European infrastructure for high-throughput systemic phenotyping, archiving, and dissemination of mouse models. A team of experts visited 9 research facilities and 3 commercial breeders in Europe, Canada, the United States, and Singapore. During the visits, detailed data of each facility were collected and subsequently represented in standardized floor plans and descriptive tables. These data showed that because the local needs of scientists and their projects, property issues, and national and regional laws require very specific solutions, a common strategy for the construction of such facilities does not exist. However, several basic concepts were apparent that can be described by standardized floor plans showing the principle functional units and their interconnection. Here, we provide detailed information of how individual facilities addressed their specific needs by using different concepts of connecting the principle units. Our analysis likely will be valuable to research centers that are planning to design new mouse phenotyping and archiving facilities. PMID:23043807

  19. 25 CFR 170.462 - When may a self-determination contract or self-governance agreement include PS&E review and...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction... design and approval of the PS&E package; (2) A licensed professional engineer will certify that the PS&E meets or exceeds the design, health, and safety standards in appendix B to subpart D for an IRR...

  20. 14 CFR Appendix B to Part 152 - List of Advisory Circulars Incorporated by § 152.11

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Transport. 150/5300-8—Planning and Design Criteria for Metropolitan STOL Ports. 150/5320-6B—Airport Pavement.../5320-12—Methods for the Design, Construction, and Maintenance of Skid Resistant Airport Pavement... Communications. 150/5210-10—Airport Fire and Rescue Equipment Building Guide. 150/5300-2C—Airport Design...

  1. 14 CFR Appendix B to Part 152 - List of Advisory Circulars Incorporated by § 152.11

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transport. 150/5300-8—Planning and Design Criteria for Metropolitan STOL Ports. 150/5320-6B—Airport Pavement.../5320-12—Methods for the Design, Construction, and Maintenance of Skid Resistant Airport Pavement... Communications. 150/5210-10—Airport Fire and Rescue Equipment Building Guide. 150/5300-2C—Airport Design...

  2. 14 CFR Appendix B to Part 152 - List of Advisory Circulars Incorporated by § 152.11

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Transport. 150/5300-8—Planning and Design Criteria for Metropolitan STOL Ports. 150/5320-6B—Airport Pavement.../5320-12—Methods for the Design, Construction, and Maintenance of Skid Resistant Airport Pavement... Communications. 150/5210-10—Airport Fire and Rescue Equipment Building Guide. 150/5300-2C—Airport Design...

  3. 14 CFR Appendix B to Part 152 - List of Advisory Circulars Incorporated by § 152.11

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transport. 150/5300-8—Planning and Design Criteria for Metropolitan STOL Ports. 150/5320-6B—Airport Pavement.../5320-12—Methods for the Design, Construction, and Maintenance of Skid Resistant Airport Pavement... Communications. 150/5210-10—Airport Fire and Rescue Equipment Building Guide. 150/5300-2C—Airport Design...

  4. 14 CFR Appendix B to Part 152 - List of Advisory Circulars Incorporated by § 152.11

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Transport. 150/5300-8—Planning and Design Criteria for Metropolitan STOL Ports. 150/5320-6B—Airport Pavement.../5320-12—Methods for the Design, Construction, and Maintenance of Skid Resistant Airport Pavement... Communications. 150/5210-10—Airport Fire and Rescue Equipment Building Guide. 150/5300-2C—Airport Design...

  5. 36 CFR 230.37 - State priority plan-educational assistance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... sessions; (8) Web site construction and maintenance; or (9) Similar activities designed to bring landowners to an informed decision point and accelerate adoption of sustainable forest practices in a State. (b...

  6. 36 CFR 230.37 - State priority plan-educational assistance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... sessions; (8) Web site construction and maintenance; or (9) Similar activities designed to bring landowners to an informed decision point and accelerate adoption of sustainable forest practices in a State. (b...

  7. 36 CFR 230.37 - State priority plan-educational assistance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... sessions; (8) Web site construction and maintenance; or (9) Similar activities designed to bring landowners to an informed decision point and accelerate adoption of sustainable forest practices in a State. (b...

  8. New Directions in School Furnishings.

    ERIC Educational Resources Information Center

    Roskos, Bob

    2003-01-01

    Describes trends in school furniture design, including emphasis on ergonomics, mobility, accommodation of technology, and the use of private sector providers to plan and implement the furniture, fixtures, and equipment portion of school construction budgets. (EV)

  9. At the American Museum: The Once and Future Museum.

    ERIC Educational Resources Information Center

    Preston, Douglas J.

    1981-01-01

    Describes the design, initial construction and subsequent additions to the American Museum of Natural History. The museum's original building master plan, created over a century ago, is now 60 percent complete. (WB)

  10. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  11. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  12. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  13. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  14. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  15. Green Streets, Green Jobs, Green Towns (G3) Guides and Publications

    EPA Pesticide Factsheets

    This page provides links to guides and resources for: policy, regulations, and incentives; planning and design; construction, operation, and maintenance; financing and economic benefits; and, green jobs and training.

  16. Constance mirror program: Progress and plans

    NASA Technical Reports Server (NTRS)

    Klinkowstein, R. E.; Mauel, M. E.; Irby, J. H.; Smullin, L. D.; Voldman, S. H.

    1981-01-01

    The current state of the mechanics of the Constance II experiment, the physics results gathered, the motivation background, and future plans for the Constance II experiment are reviewed. Several improvements have been made and several experimental investigations have been completed. These include the construction/installation/testing of: (1) liquid-nitrogen cooled, Ioffe bars installed, (2) a diverter coil (3) the 100 kW ICRF generator, (4) the data acquisition system, and (5) the optimum hot-iron operation of the machine with Titanium and pulsed-gas plasma guns. Measurements were made of the density, temperature, and radius of the plasma. Ion-cyclotron fluctuations were observed, their bandwidth measured, and data collected demonstrating resonance heating. New X-ray diagnostics were designed and purchased, and progress on the Thomson scattering was made. Finally, a new hot cathode gun was designed and constructed.

  17. Explaining the Intention to Use Technology among Student Teachers: An Application of the Theory of Planned Behavior (TPB)

    ERIC Educational Resources Information Center

    Teo, Timothy; Lee, Chwee Beng

    2010-01-01

    Purpose: This paper aims to examine pre-service teachers' self-reported intention to use technology by employing the Theory of Planned Behavior (TPB) as the research framework. Design/methodology/approach: In total, 157 student teachers completed a survey questionnaire measuring their responses to four constructs in the TPB. These were…

  18. APPA: Association of Higher Education Facilities Officers Educational Conference and Annual Meeting Proceedings (82nd, Philadelphia, Pennsylvania, July 16-18, 1995).

    ERIC Educational Resources Information Center

    APPA: Association of Higher Education Facilities Officers, Alexandria, VA.

    The 23 papers presented in this Proceedings are grouped into four categories: business management; facilities planning, design, and construction; human resource management; and energy and environment. Papers are: (1) "A Business Approach to the Facility Function" (Alan B. Abramson); (2) "Management by Strategic Planning" (Jerry C. Black); (3)…

  19. Review of architecture and interior designs in Italian kindergartens and their relationship with motor development.

    PubMed

    Scoditti, Silvia; Clavica, Fulgenzio; Caroli, Margherita

    2011-10-01

    The construction of a school is the first pedagogical act. Its form, the relationship with nature, light, materials and colours provides important educational inputs for children. Different social, philosophical, pedagogical and architectural theories on the spaces built for and around the child have led to the construction of different kindergartens based on fantasy, over-design, sobriety, philosophical theories, and so on. Kindergartens with a surplus of architecture and furniture may reduce the child's imagination, because they are perceived as a too elaborate toy that gets boring. Furniture should provide children with metamorphic forms which adapt to their needs and preferences. The planning and design of buildings and spaces dedicated to children should consider the child at the center of the space built. The aim that architects should have in planning a kindergarten is the well being of the child, because his/her childhood will be the basis of the maturity as adult of tomorrow.

  20. The VolturnUS 1:8 Floating Wind Turbine: Design, Construction, Deployment, Testing, Retrieval, and Inspection of the First Grid-Connected Offshore Wind Turbine in US

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dagher, Habib; Viselli, Anthony; Goupee, Andrew

    Volume II of the Final Report for the DeepCwind Consortium National Research Program funded by US Department of Energy Award Number: DE-EE0003278.001 summarizes the design, construction, deployment, testing, numerical model validation, retrieval, and post-deployment inspection of the VolturnUS 1:8-scale floating wind turbine prototype deployed off Castine, Maine on June 2nd, 2013. The 1:8 scale VolturnUS design served as a de-risking exercise for a commercial multi-MW VolturnUS design. The American Bureau of Shipping Guide for Building and Classing Floating Offshore Wind Turbine Installations was used to design the prototype. The same analysis methods, design methods, construction techniques, deployment methods, mooring, andmore » anchoring planned for full-scale were used. A commercial 20kW grid-connected turbine was used and was the first offshore wind turbine in the US.« less

  1. Using the Theory of Planned Behavior to Predict College Students' Intention to Intervene With a Suicidal Individual.

    PubMed

    Aldrich, Rosalie S

    2015-01-01

    Suicide among college students is an issue of serious concern. College peers may effectively intervene with at-risk persons due to their regular contact and close personal relationships with others in this population of significantly enhanced risk. The current study was designed to investigate whether the theory of planned behavior constructs predicted intention to intervene when a college peer is suicidal. Undergraduate students (n = 367) completed an on-line questionnaire; they answered questions about their attitudes, subjective norms, perceived behavioral control regarding suicide and suicide intervention, as well as their intention to intervene when someone is suicidal. The data were analyzed using multiple regression. The statistical significance of this cross-sectional study indicates that the theory of planned behavior constructs predicts self-reported intention to intervene with a suicidal individual. Theory of planned behavior is an effective framework for understanding peers' intention to intervene with a suicidal individual.

  2. 50 CFR 86.20 - What activities are eligible for funding?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... these tie-up facilities on navigable waters, available to the public. You must design new construction and renovations to last at least 20 years; (2) Design these tie-up facilities for temporary use for...) Carrying out site surveys and engaging in site planning; (v) Preparing cost estimates; and (vi) Preparing...

  3. 76 FR 38361 - Takes of Marine Mammals Incidental to Specified Activities; Taking Marine Mammals Incidental to a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ... removal will be integrated into the design, construction, and environmental planning for the Navy's... environmental review. While this project is designed to produce information necessary for the proposed EHW-2... achieving the levels of reduction that were anticipated, comparative measurements must be taken during the...

  4. Engineering Design Graphics: Into the 21st Century

    ERIC Educational Resources Information Center

    Harris, La Verne Abe; Meyers, Frederick

    2007-01-01

    Graphical plans for construction of machinery and architecture have evolved over the last 6,000 years beginning from hieroglyphics to drawings on printable media, from the "Golden Age" of engineering graphics to the innovation of computer graphics and prototyping. The evolution of engineering design graphics as a profession has also evolved. Years…

  5. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... standard test method of field-cured samples, either 75 percent of the intended minimum compressive design... the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during...

  6. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... standard test method of field-cured samples, either 75 percent of the intended minimum compressive design... the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during...

  7. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... standard test method of field-cured samples, either 75 percent of the intended minimum compressive design... the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during...

  8. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... standard test method of field-cured samples, either 75 percent of the intended minimum compressive design... the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during...

  9. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... standard test method of field-cured samples, either 75 percent of the intended minimum compressive design... the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during...

  10. 42 CFR 137.360 - Does the Secretary approve project planning and design documents prepared by the Self-Governance...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC... HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and... documents prepared by the Self-Governance Tribe? The Secretary shall have at least one opportunity to...

  11. Constructing Green: Sustainability and the Places We Inhabit

    ERIC Educational Resources Information Center

    Ponce de Leon, Monica

    2011-01-01

    Before becoming dean of the A. Alfred Taubman College of Architecture and Urban Planning at the University of Michigan, the author was a professor of architecture at Harvard University where she taught design studio, lecture, and seminar courses on topics including digital technology and the history of design and an introductory course on the…

  12. Design verification tests for an axial gap permanent magnet compressor motor

    NASA Astrophysics Data System (ADS)

    Hawsey, R. A.; Bailey, J. M.

    1987-07-01

    A 30-hp, direct-drive, permanent magnet motor (PMM) has been constructed. The motor is to operate at 15,000 rpm and is designed to drive a Worthington compressor at the US DOE-owned gaseous diffusion plants. The PMM prevents traditional dynamometer testing, including locked rotor current, voltage, and torque measurements. A test plan is presented for data acquisition on the dynamometer test stand in order to calculate the equivalent circuit for the motor. A description of the hardware required for these measurements is included in the plan.

  13. TWRS Retrieval and Storage Mission and Immobilized Low Activity Waste (ILAW) Disposal Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BURBANK, D.A.

    This project plan has a twofold purpose. First, it provides a waste stream project plan specific to the River Protection Project (RPP) (formerly the Tank Waste Remediation System [TWRS] Project) Immobilized Low-Activity Waste (LAW) Disposal Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-90-01 (Ecology et al. 1994) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan (Ecology et al. 1998). Second, it provides an upper tier document that can be used as themore » basis for future subproject line-item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 [DOE 1992] and 430.1 [DOE 1995a]). The format and content of this project plan are designed to accommodate the requirements mentioned by the Tri-Party Agreement and the DOE orders. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.« less

  14. Department of the Navy Justification of Estimates FY 1991 Budget Estimates Submitted to Congress January 1990: Military Construction & Family Housing Program

    DTIC Science & Technology

    1990-01-01

    76,951,000 shall be available for study , planning, design, architect and engineer services, as authorized by law, unless the Secretary of Defense...FROM OTHER APPROPRIATIONS - (NCN-ADD) ( 0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This is a public private venture project using 10 U.S.C. 2809...FROM OTHER APPROPRIATIONS - - (NDN-ADD) ( 0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This is a public/private venture project using 10 U.S.C. 2809

  15. Multi-family update to the passive solar construction handbook

    NASA Astrophysics Data System (ADS)

    Howard, B. D.; Callahan, K. D.

    1983-11-01

    Builders and developers will accept passive solar construction and designs for integration with their existing practice if accurate and detailed plans of actual, proven passive solar subsystems and assemblies are made available to them. A Passive Solar Construction Handbook was developed. It focuses primarily upon single family homes. The multifamily update of the Handbook, is described and examples of the valuable builder information are shown. It represents a new breakthrough in DOE sponsored projects, performing a Technology Transfer on a most useful level.

  16. Report to the Board of Regents State University System of Florida. Review of Programs: Architecture, Architectural Technology, Landscape Architecture, Interior Design, Construction and Construction Technology, Building Construction, Urban and Regional Planning.

    ERIC Educational Resources Information Center

    McMinn, William G.

    An evaluation and report was done on the status of programs in architecture and related fields in the Florida State University System as a follow-up to a 1983 evaluation. The evaluation involved self-studies prepared by each program and a series of site visits to each of seven campuses and two centers with programs under review. These institutions…

  17. Review of Programs: Architecture; Architectural Technology; Landscape Architecture; Interior Design; Construction and Construction Technology; Building Construction; Urban and Regional Planning. Report to the Board of Regents, State University System of Florida.

    ERIC Educational Resources Information Center

    McMinn, William G.

    This report is an update of a report on the development and status of various programs in architecture and related fields in the State University System of Florida, a report that was submitted to the Board of Regents in May 1983. The objectives of this updated report, like those of the earlier one, are to review the anticipated needs of the…

  18. Construction of a high-tech operating room for image-guided surgery using VR.

    PubMed

    Suzuki, Naoki; Hattori, Asaki; Suzuki, Shigeyuki; Otake, Yoshito; Hayashibe, Mitsuhiro; Kobayashi, Susumu; Nezu, Takehiko; Sakai, Haruo; Umezawa, Yuji

    2005-01-01

    This project aimed to construct an operating room to implement high dimensional (3D, 4D) medical imaging and medical virtual reality techniques that would enable clinical tests for new surgical procedures. We designed and constructed such an operating room at Dai-san Hospital, the Jikei Univ. School of Medicine, Tokyo, Japan. The room was equipped with various facilities for image-guided, robot and tele- surgery. In this report, we describe an outline of our "high-tech operating room" and future plans.

  19. Professional services contract manager development and certification strategy : spr 696 : final report.

    DOT National Transportation Integrated Search

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  20. Bringing Golf Links Up to Par

    ERIC Educational Resources Information Center

    Fream, Ronald

    1976-01-01

    When the process of remodeling a golf course is undertaken with professional and thorough planning, creative design, and proper construction techniques, the finished product can provide many years of challenging and esthetically pleasing golf play. (JD)

  1. Risk management technique for liquefied natural gas facilities

    NASA Technical Reports Server (NTRS)

    Fedor, O. H.; Parsons, W. N.

    1975-01-01

    Checklists have been compiled for planning, design, construction, startup and debugging, and operation of liquefied natural gas facilities. Lists include references to pertinent safety regulations. Methods described are applicable to handling of other hazardous materials.

  2. Trimble Use Case Information : A Presentation to DOT Adjacent Band Compatibility Workshop #2

    DOT National Transportation Integrated Search

    2014-12-04

    Trimble Use Case Overview: Heavy Civil Construction - Planning, Designing, Building and Operating: Enhanced information, decision making and control across the entire project lifecycle, generating benefits including: - Faster Completion - Reduced Fue...

  3. 40 CFR 62.14685 - May I conduct a repeat performance test to establish new operating limits?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Continuous Compliance...

  4. 40 CFR 62.14685 - May I conduct a repeat performance test to establish new operating limits?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Continuous Compliance...

  5. 40 CFR 62.14720 - What information must I submit following my initial performance test?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Recordkeeping and Reporting § 62...

  6. 40 CFR 62.14720 - What information must I submit following my initial performance test?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Recordkeeping and Reporting § 62...

  7. Deep Trouble.

    ERIC Educational Resources Information Center

    Fawcett, Paul

    1997-01-01

    Discusses how accident prevention can be built into the swimming-pool design phase by paying attention to swimming-pool regulations, materials for basin and deck construction, pool-fixture placement, and signs and markings. A pool planning checklist is provided. (GR)

  8. Computer Aided Process Planning for Non-Axisymmetric Deep Drawing Products

    NASA Astrophysics Data System (ADS)

    Park, Dong Hwan; Yarlagadda, Prasad K. D. V.

    2004-06-01

    In general, deep drawing products have various cross-section shapes such as cylindrical, rectangular and non-axisymmetric shapes. The application of the surface area calculation to non-axisymmetric deep drawing process has not been published yet. In this research, a surface area calculation for non-axisymmetric deep drawing products with elliptical shape was constructed for a design of blank shape of deep drawing products by using an AutoLISP function of AutoCAD software. A computer-aided process planning (CAPP) system for rotationally symmetric deep drawing products has been developed. However, the application of the system to non-axisymmetric components has not been reported yet. Thus, the CAPP system for non-axisymmetric deep drawing products with elliptical shape was constructed by using process sequence design. The system developed in this work consists of four modules. The first is recognition of shape module to recognize non-axisymmetric products. The second is a three-dimensional (3-D) modeling module to calculate the surface area for non-axisymmetric products. The third is a blank design module to create an oval-shaped blank with the identical surface area. The forth is a process planning module based on the production rules that play the best important role in an expert system for manufacturing. The production rules are generated and upgraded by interviewing field engineers. Especially, the drawing coefficient, the punch and die radii for elliptical shape products are considered as main design parameters. The suitability of this system was verified by applying to a real deep drawing product. This CAPP system constructed would be very useful to reduce lead-time for manufacturing and improve an accuracy of products.

  9. Environmental Assessment for Fiber Optic Diverse Route

    DTIC Science & Technology

    2010-07-24

    and the military working dogs training and kennel areas. Currently, a single fiber optic communications line exists that transmits all...agreement from the County to trench along the New Santa Fe Trail. However, signs will be posted two weeks before construction begins in designated ... Plan . Heavy equipment and other vehicles associated with the trench line construction will contain hazardous materials such as motor oil and gasoline

  10. Environmental Assessment for Housing Demolition, Construction, Renovation, and Leasing Bethel Manor, Lighter-Than-Air, and Heavier-Than-Air Military Family Housing Areas

    DTIC Science & Technology

    2006-08-01

    storm water system or connections would be designed and constructed to comply with current VDES regulations. The No Action discussion for a storm...3-11 3.5.6 Transportation System .............................................................................. 3...Waste Systems of Virginia CAA Clean Air Act CDP Community Development Plan CEQ Council on Environmental Quality CERCLA Comprehensive Environmental

  11. Nanotechnology-Enabled Optical Molecular Imaging of Breast Cancer

    DTIC Science & Technology

    2008-07-01

    explanation of results. 37 KEY RESEACH ACCOMPLISHMENTS • Design of needle-based fiber optic imaging system completed and development of first...policy or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting...our results to date. As described in the Statement of Work, Year 1 plans focused on design of this system and beginning initial construction. It

  12. AAFES Shopping Center Environmental Assessment

    DTIC Science & Technology

    2009-08-01

    Plan H2S Hydrogen Sulfide SO2 Sulfur Dioxide HWMP Hazardous Waste Management Plan SMW Strategic Missile Wing ICBM Intercontinental Ballistic Missile...the no-action alternative. Land Management and Use. A waiver would be needed prior to construction to change the land use designation from Open...occur under the no-action alternative. Hazardous Materials and Waste Management . No changes to hazardous materials or waste streams would occur

  13. Social Cognitive and Planned Behavior Variables Associated with Stages of Change for Physical Activity in Spinal Cord Injury: A Multivariate Analysis

    ERIC Educational Resources Information Center

    Keegan, John; Ditchman, Nicole; Dutta, Alo; Chiu, Chung-Yi; Muller, Veronica; Chan, Fong; Kundu, Madan

    2016-01-01

    Purpose: To apply the constructs of social cognitive theory (SCT) and the theory of planned behavior (TPB) to understand the stages of change (SOC) for physical activities among individuals with a spinal cord injury (SCI). Method: Ex post facto design using multivariate analysis of variance (MANOVA). The participants were 144 individuals with SCI…

  14. Architecture of high-rise buildings as a brand of the modern Kazakhstan

    NASA Astrophysics Data System (ADS)

    Abdrassilova, Gulnara; Kozbagarova, Nina; Tuyakayeva, Ainagul

    2018-03-01

    Using practical examples article reviews urban-planning and space-planning features of design and construction of high-rise buildings in Kazakhstan conditions; methods are identified that provide for structural stability against wind and seismic loads based on innovative technical and technological solutions. Article authors stress out the fashion function of high-rise buildings in the new capital of Kazakhstan, the Astana city.

  15. Transitioning to High Performance Homes: Successes and Lessons Learned From Seven Builders

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widder, Sarah H.; Kora, Angela R.; Baechler, Michael C.

    2013-03-01

    As homebuyers are becoming increasingly concerned about rising energy costs and the impact of fossil fuels as a major source of greenhouse gases, the returning new home market is beginning to demand energy-efficient and comfortable high-performance homes. In response to this, some innovative builders are gaining market share because they are able to market their homes’ comfort, better indoor air quality, and aesthetics, in addition to energy efficiency. The success and marketability of these high-performance homes is creating a builder demand for house plans and information about how to design, build, and sell their own low-energy homes. To help makemore » these and other builders more successful in the transition to high-performance construction techniques, Pacific Northwest National Laboratory (PNNL) partnered with seven interested builders in the hot humid and mixed humid climates to provide technical and design assistance through two building science firms, Florida Home Energy and Resources Organization (FL HERO) and Calcs-Plus, and a designer that offers a line of stock plans designed specifically for energy efficiency, called Energy Smart Home Plans (ESHP). This report summarizes the findings of research on cost-effective high-performance whole-house solutions, focusing on real-world implementation and challenges and identifying effective solutions. The ensuing sections provide project background, profile each of the builders who participated in the program, and describe their houses’ construction characteristics, key challenges the builders encountered during the construction and transaction process); and present primary lessons learned to be applied to future projects. As a result of this technical assistance, 17 homes have been built featuring climate-appropriate efficient envelopes, ducts in conditioned space, and correctly sized and controlled heating, ventilation, and air-conditioning systems. In addition, most builders intend to integrate high-performance features into most or all their homes in the future. As these seven builders have demonstrated, affordable, high-performance homes are possible, but require attention to detail and flexibility in design to accommodate specific regional geographic or market-driven constraints that can increase cost. With better information regarding how energy-efficiency trade-offs or design choices affect overall home performance, builders can make informed decisions regarding home design and construction to minimize cost without sacrificing performance and energy savings.« less

  16. 7 CFR 1737.21 - The completed loan application.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... application consists of four parts: (1) A completed RUS Form 490. (2) A market survey called the Area Coverage Survey (ACS). (3) The plan and associated costs for the proposed construction, called the Loan Design (LD...

  17. 7 CFR 1737.21 - The completed loan application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... application consists of four parts: (1) A completed RUS Form 490. (2) A market survey called the Area Coverage Survey (ACS). (3) The plan and associated costs for the proposed construction, called the Loan Design (LD...

  18. 7 CFR 1737.21 - The completed loan application.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... application consists of four parts: (1) A completed RUS Form 490. (2) A market survey called the Area Coverage Survey (ACS). (3) The plan and associated costs for the proposed construction, called the Loan Design (LD...

  19. Science and Engineering

    ERIC Educational Resources Information Center

    Cowin, Roy; Reyes-Guerra, David

    1977-01-01

    Engineers may be involved in various functions such as research, development, planning, design (analysis and synthesis), construction, operation and management of engineering projects. This article discusses some branches of accredited engineering curricula, employment opportunities, the preparation for management, minimum education needed, women…

  20. 75 FR 32240 - Notice of Withdrawal of the Notice of Intent for Klingle Road Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-07

    ... Manager, Planning, Policy and Sustainability Administration, 2000 14th Street, NW., 7th Floor, Washington... constructed using context sensitive design, to provide safe non- motorized transportation and recreational...

  1. 40 CFR 62.14565 - How do I comply with the increment of progress for achieving final compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and...

  2. 40 CFR 62.14565 - How do I comply with the increment of progress for achieving final compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and...

  3. Construction and Utilization of a Beowulf Computing Cluster: A User's Perspective

    NASA Technical Reports Server (NTRS)

    Woods, Judy L.; West, Jeff S.; Sulyma, Peter R.

    2000-01-01

    Lockheed Martin Space Operations - Stennis Programs (LMSO) at the John C Stennis Space Center (NASA/SSC) has designed and built a Beowulf computer cluster which is owned by NASA/SSC and operated by LMSO. The design and construction of the cluster are detailed in this paper. The cluster is currently used for Computational Fluid Dynamics (CFD) simulations. The CFD codes in use and their applications are discussed. Examples of some of the work are also presented. Performance benchmark studies have been conducted for the CFD codes being run on the cluster. The results of two of the studies are presented and discussed. The cluster is not currently being utilized to its full potential; therefore, plans are underway to add more capabilities. These include the addition of structural, thermal, fluid, and acoustic Finite Element Analysis codes as well as real-time data acquisition and processing during test operations at NASA/SSC. These plans are discussed as well.

  4. Status and Plans for the FLARE (Facility for Laboratory Reconnection Experiments) Project

    NASA Astrophysics Data System (ADS)

    Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Bale, S.; Carter, T.; Crocker, N.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.; Chen, Y.; Cutler, R.; Fox, W.; Heitzenroeder, P.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.

    2015-11-01

    The FLARE device (flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton to study magnetic reconnection in regimes directly relevant to space, solar, astrophysical, and fusion plasmas. The existing small-scale experiments have been focusing on the single X-line reconnection process either with small effective sizes or at low Lundquist numbers, but both of which are typically very large in natural and fusion plasmas. The design of the FLARE device is motivated to provide experimental access to the new regimes involving multiple X-lines, as guided by a reconnection ``phase diagram'' [Ji & Daughton, PoP (2011)]. Most of major components of the FLARE device have been designed and are under construction. The device will be assembled and installed in 2016, followed by commissioning and operation in 2017. The planned research on FLARE as a user facility will be discussed. Supported by NSF.

  5. 75 FR 42820 - Notice of Availability of a Final Environmental Assessment (Final EA) and a Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... evaluated the construction and operation of a new 20,000-square-foot standard design Terminal Radar Approach Control Facility/Base Building conforming to the guidelines of the Terminal Facilities Design Standards... Airport Layout Plan. The Final EA has been prepared in accordance with the National Environmental Policy...

  6. Planning Educational Activities and Teaching Strategies on Constructing a Conservation Educational Module

    ERIC Educational Resources Information Center

    Dimopoulos, Dimitrios I.; Paraskevopoulos, Stefanos; Pantis, John D.

    2009-01-01

    This paper describes the design of an educational module which aims to raise awareness and change the attitudes of elementary school students about focal endangered species in protected areas. The proposed design builds on, and extends the General Teaching Model. The educational module which was developed through this approach was pilot-tested in…

  7. THE SCHOOL OF DENTAL MEDICINE NEW RESEARCH AND TEACHING BUILDING FOR THE UNIVERSITY OF PENNSYLVANIA.

    ERIC Educational Resources Information Center

    Pennsylvania Univ., Philadelphia.

    IN PLANNING A NEW RESEARCH AND TEACHING BUILDING FOR THE SCHOOL OF DENTAL MEDICINE, A PROGRAM WAS DEVELOPED OUTLINING THE DESIGN NEEDS AND THE SPACE AND FACILITY REQUIREMENTS. MAJOR AREAS OF THE PROGRAM WERE--(1) GENERAL DESIGN AND CONSTRUCTION COMPONENTS, (2) THE RESEARCH COMPONENT, AND (3) THE BASIC SCIENCE TEACHING COMPONENTS. SPACE…

  8. The State of Post-Occupancy Evaluation in the Practice of Educational Design.

    ERIC Educational Resources Information Center

    Lackney, Jeffery A.

    Over the past decade, thousands of new school buildings and renovations have been planned, designed, and constructed in the United States. Of these, only a small fraction will ever be evaluated against the educational needs of students and teachers. This paper reflects on the state of post-occupancy evaluation (POE) in the practice of educational…

  9. Maryland State Department of Education School Food and Nutrition Service Design Manual.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    The purpose of this manual is to suggest strategies for identifying components that must be addressed to create and develop a successful food service and nutrition facility. It focuses on the process involved in creating such facilities, and it provides an overview of the planning phase, design and construction, and educational specifications.…

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.

    The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less

  11. Recommended conceptual optical system design for China's Large Optical-infrared Telescope (LOT).

    PubMed

    Ma, Donglin

    2018-01-08

    Recently, China is planning to construct a new large optical-infrared telescope (LOT), in which the aperture of the primary mirror is as large as 12m. China's LOT is a general-purpose telescope, which is aimed to work with multiple scientific instruments such as spectrographs. Based on the requirements of LOT telescope, we have compared the performance of Ritchey-Chrétien (RC) design and Aplanatic-Gregorian (AG) design from the perspective of scientific performance and construction cost. By taking the primary focal ratio, Nasmyth focal ratio, and telescope's site condition into consideration, we finally recommend a RC f/1.6 design configuration for LOT's Nasmyth telescope system. Unlike the general identical configuration, we choose a non-identical configuration for the telescope system which has a shorter Cassegrain focal ratio compared to the designed Nasmyth focal ratio. The non-identical design can allow for a shorter back focal distance and therefore a shorter telescope fork to guarantee the gravitational stability of the whole telescope structure, as well as relatively lower construction cost. Detailed analysis for the feasibility of our recommended design is provided in this paper.

  12. Community Meeting to Focus on NREL Construction Plans

    Science.gov Websites

    Community Meeting to Focus on NREL Construction Plans For more information contact: Kerry Masson issues including planned construction projects on NREL's 300-acre campus. Construction plans include

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodson, J.O.

    This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world's first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC's CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodson, J.O.

    This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world`s first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC`s CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less

  15. Systems engineering studies of on-orbit assembly operation

    NASA Technical Reports Server (NTRS)

    Morgenthaler, George W.

    1991-01-01

    While the practice of construction has a long history, the underlying theory of construction is relatively young. Very little has been documented as to techniques of logistic support, construction planning, construction scheduling, construction testing, and inspection. The lack of 'systems approaches' to construction processes is certainly one of the most serious roadblocks to the construction of space structures. System engineering research efforts at CSC are aimed at developing concepts and tools which contribute to a systems theory of space construction. The research is also aimed at providing means for trade-offs of design parameters for other research areas in CSC. Systems engineering activity at CSC has divided space construction into the areas of orbital assembly, lunar base construction, interplanetary transport vehicle construction, and Mars base construction. A brief summary of recent results is given. Several models for 'launch-on-time' were developed. Launch-on-time is a critical concept to the assembly of such Earth-orbiting structures as the Space Station Freedom, and to planetary orbiters such as the Mars transfer vehicle. CSC has developed a launch vehicle selection model which uses linear programming to find optimal combinations of launch vehicles of various sizes (Atlas, Titan, Shuttles, HLLV's) to support SEI missions. Recently, the Center developed a cost trade-off model for studying on orbit assembly logistics. With this model it was determined that the most effective size of the HLLV would be in the range of 120 to 200 metric tons to LEO, which is consistent with the choices of General Stafford's Synthesis Group Report. A second-generation Dynamic Construction Activities Model ('DYCAM') process model has been under development, based on our past results in interruptability and our initial DYCAM model. This second-generation model is built on the paradigm of knowledge-based expert systems. It is aimed at providing answers to two questions: (1) what are some necessary or sufficient conditions for judging conceptual designs of spacecraft?, and (2) can a methodology be formulated such that these conditions may be used to provide computer-aided tools for evaluating conceptual designs and planning for space assembly sequences? Early simulation results indicate that the DYCAM model has a clear ability to emulate and simulate human orbital construction processes.

  16. Towards Knowledge Management for Smart Manufacturing.

    PubMed

    Feng, Shaw C; Bernstein, William Z; Hedberg, Thomas; Feeney, Allison Barnard

    2017-09-01

    The need for capturing knowledge in the digital form in design, process planning, production, and inspection has increasingly become an issue in manufacturing industries as the variety and complexity of product lifecycle applications increase. Both knowledge and data need to be well managed for quality assurance, lifecycle-impact assessment, and design improvement. Some technical barriers exist today that inhibit industry from fully utilizing design, planning, processing, and inspection knowledge. The primary barrier is a lack of a well-accepted mechanism that enables users to integrate data and knowledge. This paper prescribes knowledge management to address a lack of mechanisms for integrating, sharing, and updating domain-specific knowledge in smart manufacturing. Aspects of the knowledge constructs include conceptual design, detailed design, process planning, material property, production, and inspection. The main contribution of this paper is to provide a methodology on what knowledge manufacturing organizations access, update, and archive in the context of smart manufacturing. The case study in this paper provides some example knowledge objects to enable smart manufacturing.

  17. SNL/CA Facilities Management Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rabb, David; Clark, Eva

    2014-12-01

    At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safetymore » and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.« less

  18. Analysis and Development of a Web-Enabled Planning and Scheduling Database Application

    DTIC Science & Technology

    2013-09-01

    establishes an entity—relationship diagram for the desired process, constructs an operable database using MySQL , and provides a web- enabled interface for...development, develop, design, process, re- engineering, reengineering, MySQL , structured query language, SQL, myPHPadmin. 15. NUMBER OF PAGES 107 16...relationship diagram for the desired process, constructs an operable database using MySQL , and provides a web-enabled interface for the population of

  19. The University of Michigan, Kellogg Building Expansion & Renovation, Ann Arbor, Michigan.

    ERIC Educational Resources Information Center

    Design Cost Data, 2001

    2001-01-01

    Presents design, construction, and cost data for the University of Michigan's Kellogg Building expansion and renovation project. A list of project manufacturers and suppliers is provided along with four photographs and four floor plans. (GR)

  20. 25 CFR 170.435 - How does BIA or the tribe determine the need for a public hearing?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads... change the layout or function of connecting or related roads or streets; (c) Would cause a substantial...

  1. 25 CFR 170.435 - How does BIA or the tribe determine the need for a public hearing?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads... change the layout or function of connecting or related roads or streets; (c) Would cause a substantial...

  2. 25 CFR 170.435 - How does BIA or the tribe determine the need for a public hearing?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads... change the layout or function of connecting or related roads or streets; (c) Would cause a substantial...

  3. 25 CFR 170.435 - How does BIA or the tribe determine the need for a public hearing?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads... change the layout or function of connecting or related roads or streets; (c) Would cause a substantial...

  4. 7 CFR 4288.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 months of data supported by engineering and design calculations, and site plans, prepared by the construction engineering firm. Biobased products. Products determined by the Secretary to be commercial or... biological products, including renewable domestic agricultural materials and forestry materials; or (2...

  5. 7 CFR 4288.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 months of data supported by engineering and design calculations, and site plans, prepared by the construction engineering firm. Biobased products. Products determined by the Secretary to be commercial or... biological products, including renewable domestic agricultural materials and forestry materials; or (2...

  6. 7 CFR 4288.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 months of data supported by engineering and design calculations, and site plans, prepared by the construction engineering firm. Biobased products. Products determined by the Secretary to be commercial or... biological products, including renewable domestic agricultural materials and forestry materials; or (2...

  7. UTILITY DATA ARCHIVING FOR RISK MANAGEMENT

    EPA Science Inventory

    EPA let a contract for a consultant to collect information about historical changes in operations and maintenance, design and construction, and planning and siting for water and wastewater infrastructure. The goal of this research study is to determine risk management alternativ...

  8. 40 CFR 62.14640 - What if I do not use a wet scrubber to comply with the emission limitations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Emission Limitations and...

  9. Architectural and Landscape Survey of Camp Guernsey, Wyoming

    DTIC Science & Technology

    2017-06-01

    position unless so designated by other authorized documents. DESTROY THIS REPORT WHEN NO LONGER NEEDED. DO NOT RETURN IT TO THE ORIGINATOR. ERDC/CERL...service, the regiment reorganized as the 2nd Regiment Infantry, Wyoming National Guard. In 1905, the designation again changed to 3rd Regiment...National Guard Bureau to expedite construction by ERDC/CERL TR-17-16 24 altering design plans. One significant change was that the stone masonry

  10. Progress on the Construction of the Perpendicularly Biased 2nd Harmonic Cavity for the Fermilab Booster

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Madrak, R.; Dey, J.; Duel, K.

    A perpendicularly biased tuneable 2nd harmonic cavity, designed for the Fermilab Booster, is being assembled for testing this summer (2018). The cavity will work at twice the frequency of the fundamental cavities, and will be on only during the injection and transition (or extraction) periods. The main reason for adding this cavity is to improve beam capture and reduce losses as required by Fermilab's Proton Improvement Plan (PIP). After three years optimization and study, the cavity design has now been finalized and all constituent parts have been received. We report on the cavity final design and on the status ofmore » the construction.« less

  11. Supplement Analysis for the Watershed Management Program Final EIS (DOE EIS /SA-156) - Upper Salmon River Anadromous Fish Passage Improvement Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, Carl J.

    2004-07-13

    BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less

  12. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  13. Supervisory Presentation for Research, Information, Integration and Testing (SPRINT)

    DTIC Science & Technology

    2015-03-29

    autonomous UAVs in subsequent tests. The Vigilant Spirit Control Station ( VSCS ) is a test bed designed by the Air Force Research Laboratory for studying... VSCS has tactical situation displays (i.e., geo-spatial maps), vehicle status displays, route planning interfaces for creating vehicle flight plans...is considered one of those novel displays; Figure 2). The model builder software was integrated into the VSCS that constructs a mission model that is

  14. Factors affecting nursing students' intention to report medication errors: An application of the theory of planned behavior.

    PubMed

    Ben Natan, Merav; Sharon, Ira; Mahajna, Marlen; Mahajna, Sara

    2017-11-01

    Medication errors are common among nursing students. Nonetheless, these errors are often underreported. To examine factors related to nursing students' intention to report medication errors, using the Theory of Planned Behavior, and to examine whether the theory is useful in predicting students' intention to report errors. This study has a descriptive cross-sectional design. Study population was recruited in a university and a large nursing school in central and northern Israel. A convenience sample of 250 nursing students took part in the study. The students completed a self-report questionnaire, based on the Theory of Planned Behavior. The findings indicate that students' intention to report medication errors was high. The Theory of Planned Behavior constructs explained 38% of variance in students' intention to report medication errors. The constructs of behavioral beliefs, subjective norms, and perceived behavioral control were found as affecting this intention, while the most significant factor was behavioral beliefs. The findings also reveal that students' fear of the reaction to disclosure of the error from superiors and colleagues may impede them from reporting the error. Understanding factors related to reporting medication errors is crucial to designing interventions that foster error reporting. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. A library for the fifteenth through the twenty-first centuries.

    PubMed Central

    Cooper, R S

    1991-01-01

    The University of California, San Francisco (UCSF), began developing a program for a new library in 1977, started the design in 1985, began construction in 1988, and opened the library in September 1990. The primary objectives were to design and build a facility that would house print collections under optimal conditions, allow for ten years' growth, be flexible enough to permit future reconfiguration, support present and future technologies, and provide beautiful spaces in which to study. The planning process is summarized, planning concepts are outlined, and considerations for the electronic library are briefly reviewed. Images PMID:2039900

  16. Current issues in the design of academic health sciences libraries: findings from three recent facility projects*

    PubMed Central

    Nelson, Patricia P.

    2003-01-01

    Planning a new health sciences library at the beginning of the twenty-first century is a tremendous challenge. Technology has radically changed the way libraries function in an academic environment and the services they provide. Some individuals question whether the library as place will continue to exist as information becomes increasingly available electronically. To understand how libraries resolve programming and building design issues, visits were made to three academic health sciences libraries that have had significant renovation or completed new construction. The information gathered will be valuable for planning a new library for the University of Colorado Health Sciences Center and may assist other health sciences librarians as they plan future library buildings. PMID:12883559

  17. Time Overrun in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  18. 78 FR 77621 - Approval and Promulgation of Implementation Plans; Texas; Revisions to the New Source Review (NSR...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    ... by associated mobile sources; and the design, construction and operation of such facility, building... notice by prominent advertisement in the area affected of the location where the public can see the...

  19. Work plan for special design features and crack sealing maintenance.

    DOT National Transportation Integrated Search

    2013-09-01

    The Alaska DOT&PF wants to construct and maintain asphalt concrete (AC) paved highways in a way that minimizes roadway lifecycle costs while preserving acceptable : performance. Thermal cracking is a natural feature of most paved Alaska roadways that...

  20. IVHS Denver Metro Area, Master Plan, Appendix A, Project Descriptions

    DOT National Transportation Integrated Search

    1994-02-01

    THIS ACTIVITY INVOLVES THE CONCEPTUAL DESIGN, CONSTRUCTION AND IMPLEMENTATION OF A TRAFFIC OPERATIONS CENTER (TOC) FOR THE DENVER AREA. : ESTABLISHING A TOC IS CENTRAL TO THE SUCCESS OF IVHS IN THE DENVER AREA.ITS IMPORTANCE WILL CONTINUE BEYOND T...

  1. Guidelines for preliminary selection of the optimum interchange type for a specific location

    DOT National Transportation Integrated Search

    1999-01-01

    In Virginia, when new construction or major reconstruction is planned, the current practice is for a location and design engineer to select the interchange type (diamond interchange, single-point urban interchange, trumpet interchange, full cloverlea...

  2. Laboratory Equipment Criteria.

    ERIC Educational Resources Information Center

    State Univ. Construction Fund, Albany, NY.

    Requirements for planning, designing, constructing and installing laboratory furniture are given in conjunction with establishing facility criteria for housing laboratory equipment. Furniture and equipment described include--(1) center tables, (2) reagent racks, (3) laboratory benches and their mechanical fixtures, (4) sink and work counters, (5)…

  3. 40 CFR 62.14575 - What must I do if I close my CISWI unit and then restart it?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... retrofit construction of control devices so that when the affected CISWI unit is brought online, all necessary process changes and air pollution control devices operate as designed. Waste Management Plan ...

  4. Analysis on Key Points of Construction and Management of Municipal Landscape Engineering

    NASA Astrophysics Data System (ADS)

    Liang, Mingxia; Fei, Cheng

    2018-02-01

    At present, China has made great efforts to promote the construction of ecological civilization and promote the development of ecological protection and environmental construction. It has important practical significance to maintain the ecological balance and environmental quality of our country. Especially with the gradual improvement in people’s awareness of environmental protection, so that the green of the city also put forward higher requirements at the same time with the rising of the level of urbanization. In the process of urban landscape construction, the rational planning of urban landscaping involves a lot of subject knowledge. In the green process, we should fully consider the system of urban development and construction in China, based on the design of urban development and long-term planning of the landscaping project. In addition, we must also consider the traditional layout of the city area and the physical and geographical situation and so on, to enhance the objective and scientific nature of urban landscape. Therefore, it is of great practical significance to ensure the quality of landscaping in the effective management of municipal landscape engineering.

  5. The Development of a Subdivision Within the Parkway School District. Environmental Ecological Education Project. Revised.

    ERIC Educational Resources Information Center

    Parkway School District, Chesterfield, MO.

    This unit, designed for use with junior high school students, focuses on the factors involved in subdivision design and planning. Although it is specifically constructed for use in the Parkway School District, Chesterfield, Missouri, it could be adapted for use in any suburban area where subdivisions (multiple and/or single family units) exist. It…

  6. Literature Related to Planning, Design and Construction of Science Facilities.

    ERIC Educational Resources Information Center

    National Science Foundation, Washington, DC.

    A list of the articles and papers in the science facilities collection of the Architectural Services Staff is presented. It has been prepared to serve as a bibliography that may be useful to persons searching for data on the design of science facilities, and as a means of informing such persons of the material available for reference in the…

  7. 46 CFR 127.110 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2014-10-01 2014-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...

  8. 46 CFR 127.110 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2012-10-01 2012-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...

  9. 46 CFR 127.110 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2013-10-01 2013-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...

  10. Construction and application research of Three-dimensional digital power grid in Southwest China

    NASA Astrophysics Data System (ADS)

    Zhou, Yang; Zhou, Hong; You, Chuan; Jiang, Li; Xin, Weidong

    2018-01-01

    With the rapid development of Three-dimensional (3D) digital design technology in the field of power grid construction, the data foundation and technical means of 3D digital power grid construction approaches perfection. 3D digital power grid has gradually developed into an important part of power grid construction and management. In view of the complicated geological conditions in Southwest China and the difficulty in power grid construction and management, this paper is based on the data assets of Southwest power grid, and it aims at establishing a 3D digital power grid in Southwest China to provide effective support for power grid construction and operation management. This paper discusses the data architecture, technical architecture and system design and implementation process of the 3D digital power grid construction through teasing the key technology of 3D digital power grid. The application of power grid data assets management, transmission line corridor planning, geological hazards risk assessment, environmental impact assessment in 3D digital power grid are also discussed and analysed.

  11. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    NASA Astrophysics Data System (ADS)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  12. Construction of social value or utility-based health indices: the usefulness of factorial experimental design plans.

    PubMed

    Cadman, D; Goldsmith, C

    1986-01-01

    Global indices, which aggregate multiple health or function attributes into a single summary indicator, are useful measures in health research. Two key issues must be addressed in the initial stages of index construction from the universe of possible health and function attributes, which ones should be included in a new index? and how simple can the statistical model be to combine attributes into a single numeric index value? Factorial experimental designs were used in the initial stages of developing a function index for evaluating a program for the care of young handicapped children. Beginning with eight attributes judged important to the goals of the program by clinicians, social preference values for different function states were obtained from 32 parents of handicapped children and 32 members of the community. Using category rating methods each rater scored 16 written multi-attribute case descriptions which contained information about a child's status for all eight attributes. Either a good or poor level of each function attribute and age 3 or 5 years were described in each case. Thus, 2(8) = 256 different cases were rated. Two factorial design plans were selected and used to allocate case descriptions to raters. Analysis of variance determined that seven of the eight clinician selected attributes were required in a social value based index for handicapped children. Most importantly, the subsequent steps of index construction could be greatly simplified by the finding that a simple additive statistical model without complex attribute interaction terms was adequate for the index. We conclude that factorial experimental designs are an efficient, feasible and powerful tool for the initial stages of constructing a multi-attribute health index.

  13. Coal gasification systems engineering and analysis, volume 2

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The major design related features of each generic plant system were characterized in a catalog. Based on the catalog and requirements data, approximately 17 designs and cost estimates were developed for MBG and alternate products. A series of generic trade studies was conducted to support all of the design studies. A set of cost and programmatic analyses were conducted to supplement the designs. The cost methodology employed for the design and sensitivity studies was documented and implemented in a computer program. Plant design and construction schedules were developed for the K-T, Texaco, and B&W MBG plant designs. A generic work breakdown structure was prepared, based on the K-T design, to coincide with TVA's planned management approach. An extensive set of cost sensitivity analyses was completed for K-T, Texaco, and B&W design. Product price competitiveness was evaluated for MBG and the alternate products. A draft management policy and procedures manual was evaluated. A supporting technology development plan was developed to address high technology risk issues. The issues were identified and ranked in terms of importance and tractability, and a plan developed for obtaining data or developing technology required to mitigate the risk.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Albis, A.H.A.

    This research effort is concerned with the identification and utilization of practical design guidelines to meet the demand for guidance in innovative planning and building design for Egyptian desert conditions. An energy-conscious design can be realized with a minimum expenditure of exhaustible energy resources and maximum utilization of the natural energies for cooling and heating. The energy design guidelines developed will be applied to an Urban Center, on a site selected to alleviate the stress on Cairo, which has been suffering for over two decades from housing shortages due to overpopulation. Design criteria to meet the challenges of this researchmore » include: neighborhood planning; orientation; building details; shading; colors of walls and roofs; materials; and massing configuration. In this research, desert construction and its aspects, use of building materials, approaches to energy conservation, and architectural principles for neighborhood planning are identified. The human requirement for thermal comfort specific to desert environments are analyzed and related to diurnal and annual patterns of outdoor conditions, and to the potential for modifying indoor thermal conditions by designs suitable to prevailing climatic conditions.« less

  15. Low-carbon building assessment and multi-scale input-output analysis

    NASA Astrophysics Data System (ADS)

    Chen, G. Q.; Chen, H.; Chen, Z. M.; Zhang, Bo; Shao, L.; Guo, S.; Zhou, S. Y.; Jiang, M. M.

    2011-01-01

    Presented as a low-carbon building evaluation framework in this paper are detailed carbon emission account procedures for the life cycle of buildings in terms of nine stages as building construction, fitment, outdoor facility construction, transportation, operation, waste treatment, property management, demolition, and disposal for buildings, supported by integrated carbon intensity databases based on multi-scale input-output analysis, essential for low-carbon planning, procurement and supply chain design, and logistics management.

  16. Variable speed gas engine-driven air compressor system

    NASA Astrophysics Data System (ADS)

    Morgan, J. R.; Ruggles, A. E.; Chen, T. N.; Gehret, J.

    1992-11-01

    Tecogen Inc. and Ingersoll-Rand Co. as a subcontractor have designed a nominal 150-hp gas engine-driven air compressor utilizing the TECODRIVE 8000 engine and the Ingersoll-Rand 178.5-mm twin screw compressor. Phase 1 included the system engineering and design, economic and applications studies, and a draft commercialization plan. Phase 2 included controls development, laboratory prototype construction, and performance testing. The testing conducted verified that the compressor meets all design specifications.

  17. Water Power in The Wilderness: The History of Bonneville Lock and Dam

    DTIC Science & Technology

    1997-01-01

    to present many complex problems of site selection, proper construction techniques, and equipment design . The project first received serious...Bonneville Dam amply lived up to the hopes and dreams of its promoters and designers . In the short term, Bonneville supplied essential power for the...plan for the Columbia River. It designated Grand Coulee as the key upriver project and Bonneville as the lowermost in the chain . Report data on the

  18. The Impacts of Climate Change and Anthropogenic Processes on Permafrost Soils and USAF Infrastructure within Northern Tier Bases

    DTIC Science & Technology

    2017-03-24

    between the capabilities of these two soil conditions will need to be taken into account when designing the facility. Problem Statement The IPCC claims...ability to plan foundation designs and mitigation techniques for changing soil characteristics. 9 II. Literature Review...AFB will be constructed on permafrost soils. Golder Associates (2016) states in their design report, If permafrost soils are encountered, two of the

  19. Department of the Navy FY 1993 Budget Estimates, DoD Base Closure and Realignment Program 2. Justification Data Submitted to Congress January 1992

    DTIC Science & Technology

    1992-01-01

    DESIGN WAS MOST RECENTLY USED: (3) TOTAL COST (C) - (A) + (B) OR (0) + ( E ): (SO0O) (A) PRODUCTION OF PLANS AND SPECIFICATIONS ......... _1: (B) ALL... E ) IN-HOUSE . . . . . . . . . . . . . . . . . . . . . . . . (4) CONSTRUCTION START .................... .. - (MONTH AND...Z. (2) BASIS: (A) STANDARD OR DEFINITIVE DESIGN: YES__NO.. _ (B) WHERE DESIGN WAS MOST RECENTLY USED: (3) TOTAL COST (C) - (A) + (B) OR (D) + ( E

  20. SU-F-E-10: Student-Driven Exploration of Radiographic Material Properties, Phantom Construction, and Clinical Workflows Or: The Extraordinary Life of CANDY MAN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahon, RN; Riblett, MJ; Hugo, GD

    Purpose: To develop a hands-on learning experience that explores the radiological and structural properties of everyday items and applies this knowledge to design a simple phantom for radiotherapy exercises. Methods: Students were asked to compile a list of readily available materials thought to have radiation attenuation properties similar to tissues within the human torso. Participants scanned samples of suggested materials and regions of interest (ROIs) were used to characterize bulk attenuation properties. Properties of each material were assessed via comparison to a Gammex Tissue characterization phantom and used to construct a list of inexpensive near-tissue-equivalent materials. Critical discussions focusing onmore » samples found to differ from student expectations were used to revise and narrow the comprehensive list. From their newly acquired knowledge, students designed and constructed a simple thoracic phantom for use in a simulated clinical workflow. Students were tasked with setting up the phantom and acquiring planning CT images for use in treatment planning and dose delivery. Results: Under engineer and physicist supervision, students were trained to use a CT simulator and acquired images for approximately 60 different foodstuffs, candies, and household items. Through peer discussion, students gained valuable insights and were made to review preconceptions about radiographic material properties. From a subset of imaged materials, a simple phantom was successfully designed and constructed to represent a human thorax. Students received hands-on experience with clinical treatment workflows by learning how to perform CT simulation, create a treatment plan for an embedded tumor, align the phantom for treatment, and deliver a treatment fraction. Conclusion: In this activity, students demonstrated their ability to reason through the radiographic material selection process, construct a simple phantom to specifications, and exercise their knowledge of clinical workflows. Furthermore, the enjoyable and inexpensive nature of this project proved to attract participant interest and drive creative exploration. Mahon and Riblett have nothing to disclose; Hugo has a research agreement with Phillips Medical systems, a license agreement with Varian Medical Systems, research grants from the National Institute of Health. Authors do not have any potential conflicts of interest to disclose.« less

Top