Sample records for planning designing implementing

  1. Design and Implementation of the PMS Module for ’Argos’

    DTIC Science & Technology

    1989-12-01

    designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and benefits such a...analyzing, designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and... design and implementation. PMS is the system developed by the navy to provide each ship, department, and supervisor with the tools needed to plan

  2. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  3. 40 CFR 62.10100 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS South Carolina... Identification of plan. (a) Identification of plan. South Carolina Designated Facility Plan (Section 111(d) Plan). (b) The plan was officially submitted as follows: (1) Implementation Plan for Control of Designated...

  4. School Counselor Lead Initial Individual Career and Academic Plan Implementation Design

    ERIC Educational Resources Information Center

    Moeder-Chandler, Markus

    2017-01-01

    In Fall of 2014 for Fountain-Fort Carson School District #8 undertook a revamping of graduation and state-mandated ICAP requirements for implementation for the graduating class of 2021. This design and implementation process included numerous stakeholders and several years of planning from Fall of 2014 to Spring of 2017. The design and…

  5. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. Fink, D. Hill, J. O'Hara

    2004-11-30

    Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

  6. 24 CFR 598.430 - Revocation of designation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... approval from HUD; (2) Has failed to make progress in implementing the strategic plan; or (3) Has not complied substantially with the strategic plan. (b) Letter of warning. Before revoking the designation of... complying substantially with, or has failed to make progress in implementing the strategic plan; and (2...

  7. 24 CFR 598.430 - Revocation of designation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... approval from HUD; (2) Has failed to make progress in implementing the strategic plan; or (3) Has not complied substantially with the strategic plan. (b) Letter of warning. Before revoking the designation of... complying substantially with, or has failed to make progress in implementing the strategic plan; and (2...

  8. 75 FR 66319 - State Systems Advance Planning Document (APD) Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ...) equipment and services. The APD process was designed to mitigate financial risks, avoid incompatibilities... develop a General Systems Design (GSD). Implementation APD means a recorded plan of action to request Federal financial participation (FFP) in the costs of designing, developing and implementing the system...

  9. 75 FR 57186 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-0203-201035; FRL-9202-9] Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality Planning Purposes... determination that the Birmingham, Alabama, nonattainment area has attained the 24-hour fine particulate matter...

  10. 76 FR 31239 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... 40 CFR 52.1004(c), suspends the requirements for this area to submit an attainment demonstration... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2011-0084-201135; FRL- 9312-5] Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality Planning...

  11. Implementation Plan for Chemical Industry R&D Roadmap for Nanomaterials by Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2006-04-01

    The purpose of this effort is to develop an implementation plan to realize the vision and goals identified in the Chemical Industry R&D Roadmap for Nanomaterials By Design: From Fundamentals to Function.

  12. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an... requirements that the state and local governments, as Empowerment Zone designees, have agreed to meet as...

  13. 76 FR 36873 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-1036-201138; FRL-9322-4] Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality Planning Purposes... Atlanta, Georgia 1997 8-hour ozone nonattainment area has attained the 1997 8- hour ozone national ambient...

  14. 76 FR 18650 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... determination, in accordance with 40 CFR 52.1004(c), suspends the requirements for this area to submit an... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-0798-201048; FRL-9288-8] Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality Planning Purposes...

  15. 76 FR 31858 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... accordance with 40 CFR 52.1004(c), suspends the requirements for this area to submit an attainment... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2011-0055-201136; FRL-9313-8] Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality Planning Purposes...

  16. Strategic Enterprise Architecture Design and Implementation Plan for the Montana Department of Transportation

    DOT National Transportation Integrated Search

    2016-08-01

    The purpose of this research report is to develop a Strategic Enterprise Architecture (EA) Design and Implementation Plan for the Montana Department of Transportation (MDT). Information management systems are vital to maintaining the States transp...

  17. Design requirements for SRB production control system. Volume 4: Implementation

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.

  18. Planning and Design: A Systems Approach.

    ERIC Educational Resources Information Center

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community…

  19. 40 CFR 62.8870 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Ohio Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.8870 Identification of plan. The Ohio State Implementation Plan for implementing the Federal Municipal Solid Waste Landfill Emission Guidelines including...

  20. Design, Implementation and Evaluation of School-Based Sexual Health Education in Sub-Saharan Africa: A Qualitative Study of Researchers' Perspectives

    ERIC Educational Resources Information Center

    Sani, A. Sadiq; Abraham, Charles; Denford, Sarah; Mathews, Catherine

    2018-01-01

    This study investigated facilitators and challenges to designing, implementing and evaluating school-based sexual health education in sub-Saharan Africa, using interviews with intervention designers and researchers. At the pre-planning and planning stages, participants reported that facilitating factors included addressing the reproductive health…

  1. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  2. PC-based Multiple Information System Interface (PC/MISI) detailed design and implementation plan

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Hall, Philip P.

    1985-01-01

    The design plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intended to be used as a blueprint for the implementation of the system. Each component is described in the detail necessary to allow programmers to implement the system. A description of the system data flow and system file structures is given.

  3. Factors affecting strategic plan implementation using interpretive structural modeling (ISM).

    PubMed

    Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba

    2018-06-11

    Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.

  4. Designing Successful Professional Meetings and Conferences in Education: Planning, Implementation, and Evaluation.

    ERIC Educational Resources Information Center

    Mundry, Susan; Britton, Edward; Raizen, Senta; Loucks-Horsley, Susan

    This book outlines the principles of planning, implementing, and evaluating successful professional meetings and conferences in education. The following are among the topics discussed: (1) the knowledge base of effective meetings and conferences (nine principles held by effective meeting designers; characteristics of effective meetings and…

  5. User-Side Subsidy Programs for Special Needs Transportation : A Planning Handbook

    DOT National Transportation Integrated Search

    1983-06-01

    This handbook, first of a series, provides guidance for designing and implementing a user-side subsidy program. The book is divided into two parts--Program Planning and Program Implementation. The Planning section covers six areas--Goals and Objectiv...

  6. NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)

    EPA Science Inventory

    This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...

  7. STEM Teachers' Planned and Enacted Attempts at Implementing Engineering Design-Based Instruction

    ERIC Educational Resources Information Center

    Capobianco, Brenda M.; Rupp, Madeline

    2014-01-01

    This study investigates grades 5 and 6 science, technology, engineering, and mathematics (STEM) teachers' planned and actualized engineering design-based instruction, the instruments used to characterize their efforts, and the implications this work has for teachers' implementations of an integrated approach to STEM education.…

  8. 78 FR 4341 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Alabama Department of Environmental Management (ADEM), Air Division, to redesignate the Birmingham fine... implementation plan (SIP) to include the 1997 Annual PM 2.5 maintenance plan for the Birmingham Area that... action also approves the 2009 emissions inventory submitted with the maintenance plan. DATES: Effective...

  9. 78 FR 5306 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... the Alabama Department of Environmental Management (ADEM), Air Division, to redesignate the Birmingham... implementation plan (SIP) to include the 2006 24-hour PM 2.5 maintenance plan for the Birmingham Area that... action also approves the 2009 emissions inventory submitted with the maintenance plan. DATES: Effective...

  10. 40 CFR 52.1640 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...; and (4) Air Pollution Episode Contingency Plan for New Mexico, as adopted by the NMEID on July 7, 1988... Implementation Plan to Control Air Pollution in Areas of Bernalillo County Designated Nonattainment, as approved... SIP to udpate the Supplement to the New Mexico State Implementation Plan to Control Air Pollution in...

  11. 40 CFR 52.1640 - Original identification of plan section.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...; and (4) Air Pollution Episode Contingency Plan for New Mexico, as adopted by the NMEID on July 7, 1988... Implementation Plan to Control Air Pollution in Areas of Bernalillo County Designated Nonattainment, as approved... SIP to udpate the Supplement to the New Mexico State Implementation Plan to Control Air Pollution in...

  12. 40 CFR 52.1640 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...; and (4) Air Pollution Episode Contingency Plan for New Mexico, as adopted by the NMEID on July 7, 1988... Implementation Plan to Control Air Pollution in Areas of Bernalillo County Designated Nonattainment, as approved... SIP to udpate the Supplement to the New Mexico State Implementation Plan to Control Air Pollution in...

  13. 40 CFR 52.1640 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; and (4) Air Pollution Episode Contingency Plan for New Mexico, as adopted by the NMEID on July 7, 1988... Implementation Plan to Control Air Pollution in Areas of Bernalillo County Designated Nonattainment, as approved... SIP to udpate the Supplement to the New Mexico State Implementation Plan to Control Air Pollution in...

  14. 40 CFR 52.1640 - Original identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...; and (4) Air Pollution Episode Contingency Plan for New Mexico, as adopted by the NMEID on July 7, 1988... Implementation Plan to Control Air Pollution in Areas of Bernalillo County Designated Nonattainment, as approved... SIP to udpate the Supplement to the New Mexico State Implementation Plan to Control Air Pollution in...

  15. Guidelines for Implementing NCHRP 1-37A M-E Design Procedures in Ohio : Volume 1 -- Summary of Findings, Implementation Plan, and Next Steps

    DOT National Transportation Integrated Search

    2009-11-01

    Highway agencies across the nation are moving towards implementation of the new AASHTO Mechanistic-Empirical Pavement Design Guide (MEPDG) for pavement design. The benefits of implementing the MEPDG for routine use in Ohio includes (1) achieving more...

  16. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  17. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  18. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  19. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  20. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  1. Implementing the Aquidneck Island West Side Master Plan

    EPA Pesticide Factsheets

    This report describes a technical assistance project with Aquidneck Island to develop approaches for mixed-use zoning standards, design guidelines, and review processes to implement the West Side Master Plan.

  2. MDOT implementation plan for GPS technology in planning, design, and construction delivery

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  3. From Planning to Implementation: An Examination of Changes in the Research Design, Sample Size, and Precision of Group Randomized Trials Launched by the Institute of Education Sciences

    ERIC Educational Resources Information Center

    Spybrook, Jessaca; Puente, Anne Cullen; Lininger, Monica

    2013-01-01

    This article examines changes in the research design, sample size, and precision between the planning phase and implementation phase of group randomized trials (GRTs) funded by the Institute of Education Sciences. Thirty-eight GRTs funded between 2002 and 2006 were examined. Three studies revealed changes in the experimental design. Ten studies…

  4. Designing and Implementing Performance-Based Career Ladder Plans.

    ERIC Educational Resources Information Center

    Hawley, Willis D.

    1985-01-01

    Reviews the factors that any teacher motivation plan must incorporate to be effective and outlines 11 principles that should be followed in designing career ladder plans to meet teacher needs, increase teacher competence, and facilitate effective instruction. Warns against potential pitfalls in career ladder plans. (PGD)

  5. Design and Implementation of Collaborative Research Approaches

    NASA Technical Reports Server (NTRS)

    Venti, Mike W.; Berger, David E.

    2009-01-01

    This poster reviews the collarborative research approaches that NASA has been designing and implementing for the Integrated Vehicle Health Management (IVHM) Project. The inputs for the technical plan are reviewed, the Research Test and Integration Plan (RTIP) WIKI, is used to create and propose a multi-themed and multi-partner research testing opportunities. The outputs are testing opportunities.

  6. 40 CFR 130.9 - Designation and de-designation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 130.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER... continue water quality planning activities within the designated boundaries. (c) Impact of de-designation... responsibility for continued water quality planning and oversight of implementation within the area. (d...

  7. 78 FR 21871 - Approval and Promulgation of State Plans for Designated Facilities and Pollutants: Connecticut...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... promulgated on May 10, 2006. Connecticut DEEP's State Plan is for implementing and enforcing provisions at... and Promulgation of State Plans for Designated Facilities and Pollutants: Connecticut; 111(d)/129 Revised State Plan for Large and Small Municipal Waste Combustors AGENCY: Environmental Protection Agency...

  8. Applying Community Engagement to Disaster Planning: Developing the Vision and Design for the Los Angeles County Community Disaster Resilience Initiative

    PubMed Central

    Tang, Jennifer; Lizaola, Elizabeth; Jones, Felica; Brown, Arleen; Stayton, Alix; Williams, Malcolm; Chandra, Anita; Eisenman, David; Fogleman, Stella; Plough, Alonzo

    2013-01-01

    Community resilience (CR) is a priority for preparedness, but few models exist. A steering council used community-partnered participatory research to support workgroups in developing CR action plans and hosted forums for input to design a pilot demonstration of implementing CR versus enhanced individual preparedness toolkits. Qualitative data describe how stakeholders viewed CR, how toolkits were developed, and demonstration design evolution. Stakeholders viewed community engagement as facilitating partnerships to implement CR programs when appropriately supported by policy and CR resources. Community engagement exercises clarified motivations and informed action plans (e.g., including vulnerable populations). Community input identified barriers (e.g., trust in government) and CR-building strategies. A CR toolkit and demonstration comparing its implementation with individual preparedness were codeveloped. Community-partnered participatory research was a useful framework to plan a CR initiative through knowledge exchange. PMID:23678916

  9. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Purpose and implementation of contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... contingency plan must be designed to minimize hazards to human health or the environment from fires...

  10. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Purpose and implementation of contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or...

  11. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    PubMed

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  12. MDOT implementation plan for global positioning systems (GPS) technology in planning, design, and construction delivery.

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  13. Acceptance testing for PACS: from methodology to design to implementation

    NASA Astrophysics Data System (ADS)

    Liu, Brent J.; Huang, H. K.

    2004-04-01

    Acceptance Testing (AT) is a crucial step in the implementation process of a PACS within a clinical environment. AT determines whether the PACS is ready for clinical use and marks the official sign off of the PACS product. Most PACS vendors have Acceptance Testing (AT) plans, however, these plans do not provide a complete and robust evaluation of the full system. In addition, different sites will have different special requirements that vendor AT plans do not cover. The purpose of this paper is to introduce a protocol for AT design and present case studies of AT performed on clinical PACS. A methodology is presented that includes identifying testing components within PACS, quality assurance for both functionality and performance, and technical testing focusing on key single points-of-failure within the PACS product. Tools and resources that provide assistance in performing AT are discussed. In addition, implementation of the AT within the clinical environment and the overall implementation timeline of the PACS process are presented. Finally, case studies of actual AT of clinical PACS performed in the healthcare environment will be reviewed. The methodology for designing and implementing a robust AT plan for PACS was documented and has been used in PACS acceptance tests in several sites. This methodology can be applied to any PACS and can be used as a validation for the PACS product being acquired by radiology departments and hospitals. A methodology for AT design and implementation was presented that can be applied to future PACS installations. A robust AT plan for a PACS installation can increase both the utilization and satisfaction of a successful implementation of a PACS product that benefits both vendor and customer.

  14. 77 FR 75865 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... 1997 Annual PM 2.5 NAAQS maintenance plan, including the on-road motor vehicle insignificance finding... Implementation Plan (SIP) to include the 1997 Annual PM 2.5 maintenance plan for the Kentucky portion of the Huntington-Ashland Area. EPA is also approving the on-road motor vehicle insignificance finding for direct PM...

  15. Choosing Wellness: Comprehensive Health Education Planning and Implementation Handbook. A Handbook for Head Start Programs [and] Resource Guide: A Guide for Head Start Programs.

    ERIC Educational Resources Information Center

    Enright, Margaret; Davidson, Tasha

    These materials consist of: (1) a planning and implementation handbook designed to help Head Start managers better understand, plan, and implement a more comprehensive aproach to health education and health promotion--one that addresses local needs and tailors programs to the needs of the children, parents, and staff; and (2) a resource guide that…

  16. RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Annette L. Schafer

    2012-06-01

    A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less

  17. Region 4 ATMS local evaluation report

    DOT National Transportation Integrated Search

    2005-07-01

    In March, 1996, the Rochester Areawide Advanced Transportation Management System Report (6) established the need for an ITS as well as a strategic implementation/deployment plan. This plan has, in part, been implemented through the design and constru...

  18. Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.

  19. Design and Implementation of a Pilot Obesity Prevention Program in a Low-Resource School: Lessons Learned and Research Recommendations

    ERIC Educational Resources Information Center

    Baskin, Monica L.; Zunker, Christie; Worley, Courtney B.; Dial, Brenda; Kimbrough, Linda

    2009-01-01

    Purpose: This paper seeks to describe the design, implementation, and lessons learned from an obesity prevention pilot program delivered in a low resource school in the USA. Design/methodology/approach: A planned program evaluation was conducted to: document explicitly the process of designing and implementing the program; and assess the…

  20. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    NASA Astrophysics Data System (ADS)

    Budiman, Kholiq; Prahasto, Toni; Kusumawardhani, Amie

    2018-02-01

    This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system can motivate the planner unit in realizing the budget that has been designed. It also proves that the value chain of the information planning system has brought implications for budget realization.

  1. 75 FR 13336 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Approved for Collection at Key West International Airport (EYW) and Use at EYW: Runway safety area design. Runway safety area construction. Approach clearing--design. Runway obstruction clearing--design. Runway obstruction clearing, phase II--construction. Noise implementation plan, phase 6--design. Noise implementation...

  2. Putting Adaptive Management into Monitoring: Retrospective and Prospective Views of Northwest Forest Plan Monitoring

    Treesearch

    David E. Busch; Jon R. Martin

    2006-01-01

    Based on ten years of Northwest Forest Plan implementation, we focus on key scientifically-oriented questions relating to improving Plan monitoring. The questions, which fall into groups concerning issues of scale, integration, and efficiency, have applicability to monitoring programs being designed and implemented throughout the world. Progress toward answering such...

  3. 75 FR 64675 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ... approve a request from the State of Texas to redesignate the Beaumont/Port Arthur (BPA) Texas ozone... making a final determination that the BPA nonattainment area has attained the 1997 8- hour ozone NAAQS... BPA State Implementation Plan (SIP), a 1997 8-hour ozone maintenance plan that includes a 2021 Motor...

  4. Federal Policy to Local Level Decision-Making: Data Driven Education Planning in Nigeria

    ERIC Educational Resources Information Center

    Iyengar, Radhika; Mahal, Angelique R.; Felicia, Ukaegbu-Nnamchi Ifeyinwa; Aliyu, Balaraba; Karim, Alia

    2015-01-01

    This article discusses the implementation of local level education data-driven planning as implemented by the Office of the Senior Special Assistant to the President of Nigeria on the Millennium Development Goals (OSSAP-MDGs) in partnership with The Earth Institute, Columbia University. It focuses on the design and implementation of the…

  5. Curriculum Planning for All Learners: Applying Universal Design for Learning (UDL) to a High School Reading Comprehension Program

    ERIC Educational Resources Information Center

    Meo, Grace

    2008-01-01

    The universal design for learning (UDL) principles provide a blueprint for designing a curriculum that addresses the diverse needs of all learners. The author provides an overview of UDL, connections to curriculum planning, and practical techniques that guide general and special education teachers in planning and implementing curriculum, using the…

  6. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  7. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  8. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  9. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  10. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  11. Design and Implementation of a Project-Based Active/Cooperative Engineering Design Course for Freshmen

    ERIC Educational Resources Information Center

    Abdulaal, R. M.; Al-Bahi, A. M.; Soliman, A. Y.; Iskanderani, F. I.

    2011-01-01

    A project-based active/cooperative design course is planned, implemented, assessed and evaluated to achieve several desired engineering outcomes. The course allows freshman-level students to gain professional hands-on engineering design experience through an opportunity to practise teamwork, quality principles, communication skills, life-long…

  12. In-Service Training for Instructors Designed to Build the Necessary Skills Needed to Plan, Develop, and Implement Competency-Based Vocational Education. Final Report (July 1, 1980-June 30, 1981).

    ERIC Educational Resources Information Center

    Epler, Doris M.

    This project extended two previous projects which were designed to assist teachers in building the necessary skills to plan, develop, and implement competency-based vocational education (CBVE). In addition to released time for instructors, the project provided the funds necessary to form an articulation team effort among Pennsylvania's Reading…

  13. Work Zone Design and Operations Enhancements

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  14. The Microcomputer in the Library: VI. Implementation and Future Development.

    ERIC Educational Resources Information Center

    Leggate, Peter; Dyer, Hilary

    1986-01-01

    This sixth article in a series discusses planning for the installation and implementation of automated systems in the library, workstation design and location, scheduling of software implementation, security, data input, staff and reader training, job design, impact of automation on library procedures, evaluation of system performance, and future…

  15. 78 FR 21302 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... in Subpart 212.1, ``A burner designed to reduce flame turbulence by the mixing of fuel and air and by... Pavement and Asphalt Based Surface Coating,'' (see 77 FR 13974). Specifically, New York made amendments to...

  16. Improving Implementation of Function-Based Interventions: Self-Monitoring, Data Collection, and Data Review

    ERIC Educational Resources Information Center

    Pinkelman, Sarah E.; Horner, Robert H.

    2017-01-01

    The success of function-based interventions depends not just on the quality of procedures but also on the extent to which procedures are implemented as planned. Too often in schools, effort is committed to functional assessment and behavior support plan design, only to be followed by weak implementation. This study used a multiple baseline across…

  17. Design of Digital Learning Material on Social-Psychological Theories for Nutrition Behavior Research

    ERIC Educational Resources Information Center

    Busstra, Maria C.; De Graaf, Cees; Hartog, Rob

    2007-01-01

    This article describes the design, implementation and evaluation of digital learning material on the social--psychological Theory of Planned Behavior (TPB) and its use in nutrition behavior research. The design is based on guidelines derived from theories on instructional design. The major component of the design challenge is to implement three…

  18. 24 CFR 597.301 - Selection factors for designation of nominated urban areas.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT... designation, the Secretary shall consider: (1) The effectiveness of the strategic plan in accordance with the... made pursuant to § 597.200(a)(2) that the strategic plan will be implemented; (3) The extent to which...

  19. 75 FR 43510 - Office of Innovation and Improvement; Overview Information; Charter Schools Program (CSP) Grants...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... Schools Program (CSP) Grants to Non-State Educational Agencies for Planning, Program Design, and..., program design, and implementation, and non-SEA grants for dissemination provide funds for these purposes.... Non-SEA eligible applicants that propose to use grant funds for planning, program design, and...

  20. Major Issues in the Design of New Educational Systems.

    ERIC Educational Resources Information Center

    Salisbury, David F.

    The necessity of design and planning for school restructuring with a macro focus on education systems design is discussed in this paper. Eight support and implementation strategies are identified: utilization of a formal change process; planned coordination; multiple sponsorship; formation of a grassroots collaboration network; external and…

  1. 40 CFR 51.111 - Description of control measures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.111 Description of control measures. Each plan must set forth a control strategy which includes the following: (a... designation of agency responsibility for enforcement of implementation. (b) [Reserved] [51 FR 40665, Nov. 7...

  2. Planning and design of a knowledge based system for green manufacturing management

    NASA Astrophysics Data System (ADS)

    Kamal Mohd Nawawi, Mohd; Mohd Zuki Nik Mohamed, Nik; Shariff Adli Aminuddin, Adam

    2013-12-01

    This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages. The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gauging Absences of Pre-requisites (GAP). The hybrid KB/GAP system identifies all potentials elements of green manufacturing management issues throughout the development of this system. The KB system used in the planning and design stages analyses the gap between the existing and the benchmark organizations for an effective implementation through the GAP analysis technique. The proposed KBGMM model at the design stage explores two components, namely Competitive Priority and Lean Environment modules. Through the simulated results, the KBGMM System has identified, for each modules and sub-module, the problem categories in a prioritized manner. The System finalized all the Bad Points (BP) that need to be improved to achieve benchmark implementation of GMM at the design stage. The System provides valuable decision making information for the planning and design a GMM in term of business organization.

  3. Design, implementation, and first-year outcomes of a value-based drug formulary.

    PubMed

    Sullivan, Sean D; Yeung, Kai; Vogeler, Carol; Ramsey, Scott D; Wong, Edward; Murphy, Chad O; Danielson, Dan; Veenstra, David L; Garrison, Louis P; Burke, Wylie; Watkins, John B

    2015-04-01

    Value-based insurance design attempts to align drug copayment tier with value rather than cost. Previous implementations of value-based insurance design have lowered copayments for drugs indicated for select "high value" conditions and have found modest improvements in medication adherence. However, these implementations have generally not resulted in cost savings to the health plan, suggesting a need for increased copayments for "low value" drugs. Further, previous implementations have assigned equal copayment reductions to all drugs within a therapeutic area without assessing the value of individual drugs. Aligning the individual drug's copayment to its specific value may yield greater clinical and economic benefits. In 2010, Premera Blue Cross, a large not-for-profit health plan in the Pacific Northwest, implemented a value-based drug formulary (VBF) that explicitly uses cost-effectiveness analyses after safety and efficacy reviews to estimate the value of each individual drug. Concurrently, Premera increased copayments for existing tiers. To describe and evaluate the design, implementation, and first-year outcomes of the VBF. We compared observed pharmacy cost per member per month in the year following the VBF implementation with 2 comparator groups: (1) observed pharmacy costs in the year prior to implementation, and (2) expected costs if no changes were made to the pharmacy benefits. Expected costs were generated by applying autoregressive integrated moving averages to pharmacy costs over the previous 36 months. We used an interrupted time series analysis to assess drug use and adherence among individuals with diabetes, hypertension, or dyslipidemia compared with a group of members in plans that did not implement a VBF.  Pharmacy costs decreased by 3% compared with the 12 months prior and 11% compared with expected costs. There was no significant decline in medication use or adherence to treatments for patients with diabetes, hypertension, or dyslipidemia. The VBF and copayment changes enabled pharmacy plan cost savings without negatively affecting utilization in key disease states.

  4. Work zone design and operation enhancements : final report, March 2010.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  5. 77 FR 37411 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    .... Administrators. Design Survey Data Collection (Approved March 7, 2012) Design Survey: Discussion State-Level 30 1... Youth Services Bureau (FYSB) and the Office of Planning, Research, and Evaluation (OPRE), Administration... Impact and In-depth Implementation Study (IS); 2. The Design and Implementation Study (DIS); and 3. The...

  6. Develop a Professional Learning Plan

    ERIC Educational Resources Information Center

    Journal of Staff Development, 2013

    2013-01-01

    A professional learning plan establishes short-and long-term plans for professional learning and implementation of the learning. Such plans guide individuals, schools, districts, and states in coordinating learning experiences designed to achieve outcomes for educators and students. Professional learning plans focus on the program of educator…

  7. Marketing Internships: A Planning and Implementation Guide.

    ERIC Educational Resources Information Center

    Faught, Suzanne G.

    This planning and implementation guide is designed to assist marketing educators and others supportive of marketing education. It begins with definitions of vocabulary of related terminology and descriptions of the four models of internships presented in the guide: full-year, rotation-type format; 1-semester, rotation-type format; full-year format…

  8. 76 FR 40303 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... limited disapproval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of... designated nonattainment for the fine particulate matter (PM2.5) National Ambient Air Quality Standards...

  9. Design and implementation of a compliant robot with force feedback and strategy planning software

    NASA Technical Reports Server (NTRS)

    Premack, T.; Strempek, F. M.; Solis, L. A.; Brodd, S. S.; Cutler, E. P.; Purves, L. R.

    1984-01-01

    Force-feedback robotics techniques are being developed for automated precision assembly and servicing of NASA space flight equipment. Design and implementation of a prototype robot which provides compliance and monitors forces is in progress. Computer software to specify assembly steps and makes force feedback adjustments during assembly are coded and tested for three generically different precision mating problems. A model program demonstrates that a suitably autonomous robot can plan its own strategy.

  10. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgard, K.G.

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less

  11. Implementation of a best management practice (BMP) system for a clay mining facility in Taiwan.

    PubMed

    Lin, Jen-Yang; Chen, Yen-Chang; Chen, Walter; Lee, Tsu-Chuan; Yu, Shaw L

    2006-01-01

    The present paper describes the planning and implementation of a best management practice (BMP) system for a clay mining facility in Northern Taiwan. It is a challenge to plan and design BMPs for mitigating the impact of clay mining operations due to the fact that clay mining drainage typically contains very high concentrations of suspended solids (SS), Fe-ions, and [H+] concentrations. In the present study, a field monitoring effort was conducted to collect data for runoff quality and quantity from a clay mining area in Northern Taiwan. A BMP system including holding ponds connected in series was designed and implemented and its pollutant removal performance was assessed. The assessment was based on mass balance computations and an analysis of the relationship between BMP design parameters such as pond depth, detention time, surface loading rate, etc. and the pollutant removal efficiency. Field sampling results showed that the surface-loading rate is exponential related to the removing rate. The results provide the basis for a more comprehensive and efficient BMP implementation plan for clay mining operations.

  12. Career Education. Administrators and Counselors Implementation Model. Module IV--Planning. (4.1) Develop Plans for Curriculum Preparation and Infusion.

    ERIC Educational Resources Information Center

    Thompson, John A.; Chock, Mona K.O.

    Part of a 13-volume series designed to be used as a group inservice or a self-learning system to train school administrators and counselors for their role in career education, this first section (4.1) of module 4 (Planning) is designed to assist principals and other school administrators to develop plans for curriculum preparation and infusion of…

  13. Efficient Digital Implementation of The Sigmoidal Function For Artificial Neural Network

    NASA Astrophysics Data System (ADS)

    Pratap, Rana; Subadra, M.

    2011-10-01

    An efficient piecewise linear approximation of a nonlinear function (PLAN) is proposed. This uses simulink environment design to perform a direct transformation from X to Y, where X is the input and Y is the approximated sigmoidal output. This PLAN is then used within the outputs of an artificial neural network to perform the nonlinear approximation. In This paper, is proposed a method to implement in FPGA (Field Programmable Gate Array) circuits different approximation of the sigmoid function.. The major benefit of the proposed method resides in the possibility to design neural networks by means of predefined block systems created in System Generator environment and the possibility to create a higher level design tools used to implement neural networks in logical circuits.

  14. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  15. 40 CFR 62.3330 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Illinois Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.3330 Identification of plan. The Illinois Plan for implementing the Federal Municipal Solid Waste Landfill Emission Guidelines to control air...

  16. A School Desegregation Plan for East Baton Rouge Parish.

    ERIC Educational Resources Information Center

    Rossell, Christine H.

    This paper outlines an alternative desegregation plan that would replace the one implemented in the East Baton Rouge Parish (Louisiana) School District in 1981. Known as the Incentives Desegregation Plan, the alternative plan was designed to produce interracial contact comparable to the earlier plan, without incurring the attendant costs of…

  17. 75 FR 13275 - Environmental Impact Statements and Regulations; Availability of EPA Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... Designation, Motorized Travel Management, (Formerly Motorized Route Designation), Implementation, Siskiyou... travel management planning process and season of use and wet weather closures, and recommended the action... Yosemite Institute Environment Education Campus, Implementation, Mariposa County, CA. Summary: No formal...

  18. Design and Implementation of Volitional Control Support in Mathematics Courses

    ERIC Educational Resources Information Center

    Kim, ChanMin; Bennekin, Kimberly N.

    2013-01-01

    We designed support for volitional control with four stages for "goal initiation" ("Want it"), "goal formation" ("Plan for it"), "action control" ("Do it"), and "emotion control" ("Finish it") based on theories and models of volition. We implemented the support in…

  19. Problems of Implementation of Strategic Plans for Secondary Schools' Improvement in Anambra State

    ERIC Educational Resources Information Center

    Chukwumah, Fides Okwukweka; Ezeugbor, Carol Obiageli

    2015-01-01

    This study investigated the extent of problems of strategic plans implementation for secondary schools' improvement in Anambra State, Nigeria for quality education provision. The study used a descriptive survey design paradigm. Respondents comprised 217 principals. There was no sampling. All the principals were used. Data were collected using…

  20. 75 FR 21197 - Approval and Promulgation of Implementation Plans; Implementation Plan Revision; State of New Jersey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ...; asphalt pavement production plants; CTGs published in 2006: flat wood paneling, flexible packaging... new provisions that New Jersey designed to minimize emissions when a tank goes through a ``roof... approve them. Section 16.11 Asphalt Pavement Production Plants The New Jersey amendments to section 16.11...

  1. Energy and Environment Guide to Action - Chapter 7.1: Electricity Resource Planning and Procurement

    EPA Pesticide Factsheets

    Electricity resource planning includes power plants, electricity delivery, and end-use demand. Find more information on designing, implementing, and evaluating electricity resource planning policies. State success stories are included for reference.

  2. Urban family physician plan in Iran: challenges of implementation in Kerman.

    PubMed

    Dehnavieh, Reza; Kalantari, Ali Reza; Jafari Sirizi, Mohammad

    2015-01-01

    The Family Physician Plan has recently been implemented in three provinces of Iran on a pilot basis and is going to be implemented throughout Iran in the future. Through a qualitative design, this study aims to determine probable implementation challenges of Family Physician Plan in Kerman. This study was conducted in Kerman in 2013. Data were collected through interviews with 21 experts in the field. Sampling continued until data saturation level was achieved. All interviews were recorded and then analyzed, and main themes and subgroups were extracted from them based on a framework analysis model. most prevalent establishment challenges of Family Physician Plan were classified into policy-making, financial supply, laws and resources. The urban Family Physician Plan can be carried out more effectively by implementing this plan step by step, highlighting the relationships between the related organizations, using new payment mechanisms e.g Per Capita, DRG, make national commitment and proper educational programs for providers, development the health electronic Record, justifying providers and community about advantages of this plan, clarifying regulatory status about providers' Duties and most importantly considering a specific funding source.

  3. Healthcare Managers' Experiences of Leading the Implementation of Video Conferencing in Discharge Planning Sessions: An Interview Study.

    PubMed

    Hofflander, Malin; Nilsson, Lina; Eriksén, Sara; Borg, Christel

    2016-03-01

    This article describes healthcare managers' experiences of leading the implementation of video conferencing in discharge planning sessions as a new tool in everyday practice. Data collection took place through individual interviews and the interviews were analyzed using qualitative content analysis with an inductive approach. The results indicate that managers identified two distinct leadership perspectives when they reflected on the implementation process. They described a desired way of leading the implementation and communicating about the upcoming change, understanding and securing support for decisions, as well as ensuring that sufficient time is available throughout the change process. They also, however, described how they perceived that the implementation process was actually taking place, highlighting the lack of planning and preparation as well as the need for support and to be supportive, and having the courage to adopt and lead the implementation. It is suggested that managers at all levels require more information and training in how to encourage staff to become involved in designing their everyday work and in the implementation process. Managers, too, need ongoing organizational support for good leadership throughout the implementation of video conferencing in discharge planning sessions, including planning, start-up, implementation, and evaluation.

  4. Designing a Strategic Plan through an Emerging Knowledge Generation Process: The ATM Experience

    ERIC Educational Resources Information Center

    Zanotti, Francesco

    2012-01-01

    Purpose: The aim of this contribution is to describe a new methodology for designing strategic plans and how it was implemented by ATM, a public transportation agency based in Milan, Italy. Design/methodology/approach: This methodology is founded on a new system theory, called "quantum systemics". It is based on models and metaphors both…

  5. Evaluation of the fidelity of an interactive face-to-face educational intervention to improve general practitioner management of back pain

    PubMed Central

    French, Simon D; Green, Sally E; Francis, Jill J; Buchbinder, Rachelle; O'Connor, Denise A; Grimshaw, Jeremy M; Michie, Susan

    2015-01-01

    Objectives Implementation intervention effects can only be fully realised and understood if they are faithfully delivered. However the evaluation of implementation intervention fidelity is not commonly undertaken. The IMPLEMENT intervention was designed to improve the management of low back pain by general medical practitioners. It consisted of a two-session interactive workshop, including didactic presentations and small group discussions by trained facilitators. This study aimed to evaluate the fidelity of the IMPLEMENT intervention by assessing: (1) observed facilitator adherence to planned behaviour change techniques (BCTs); (2) comparison of observed and self-reported adherence to planned BCTs and (3) variation across different facilitators and different BCTs. Design The study compared planned and actual, and observed versus self-assessed delivery of BCTs during the IMPLEMENT workshops. Method Workshop sessions were audiorecorded and transcribed verbatim. Observed adherence of facilitators to the planned intervention was assessed by analysing the workshop transcripts in terms of BCTs delivered. Self-reported adherence was measured using a checklist completed at the end of each workshop session and was compared with the ‘gold standard’ of observed adherence using sensitivity and specificity analyses. Results The overall observed adherence to planned BCTs was 79%, representing moderate-to-high intervention fidelity. There was no significant difference in adherence to BCTs between the facilitators. Sensitivity of self-reported adherence was 95% (95% CI 88 to 98) and specificity was 30% (95% CI 11 to 60). Conclusions The findings suggest that the IMPLEMENT intervention was delivered with high levels of adherence to the planned intervention protocol. Trial registration number The IMPLEMENT trial was registered in the Australian New Zealand Clinical Trials Registry, ACTRN012606000098538 (http://www.anzctr.org.au/trial_view.aspx?ID=1162). PMID:26155819

  6. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne; Honma, George

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less

  7. Planning Guide for Instructional Computing.

    ERIC Educational Resources Information Center

    League for Innovation in the Community Coll., Laguna Hills, CA.

    Designed to assist academic administrators at community colleges in developing strategies for the application of computers to teaching and learning, this guide provides background information and recommendations for the design and implementation of an instructional computing plan. Chapter 1 examines computers as a topic of instruction, as a medium…

  8. Towards a framework for geospatial tangible user interfaces in collaborative urban planning

    NASA Astrophysics Data System (ADS)

    Maquil, Valérie; Leopold, Ulrich; De Sousa, Luís Moreira; Schwartz, Lou; Tobias, Eric

    2018-04-01

    The increasing complexity of urban planning projects today requires new approaches to better integrate stakeholders with different professional backgrounds throughout a city. Traditional tools used in urban planning are designed for experts and offer little opportunity for participation and collaborative design. This paper introduces the concept of geospatial tangible user interfaces (GTUI) and reports on the design and implementation as well as the usability of such a GTUI to support stakeholder participation in collaborative urban planning. The proposed system uses physical objects to interact with large digital maps and geospatial data projected onto a tabletop. It is implemented using a PostGIS database, a web map server providing OGC web services, the computer vision framework reacTIVision, a Java-based TUIO client, and GeoTools. We describe how a GTUI has be instantiated and evaluated within the scope of two case studies related to real world collaborative urban planning scenarios. Our results confirm the feasibility of our proposed GTUI solutions to (a) instantiate different urban planning scenarios, (b) support collaboration, and (c) ensure an acceptable usability.

  9. Towards a framework for geospatial tangible user interfaces in collaborative urban planning

    NASA Astrophysics Data System (ADS)

    Maquil, Valérie; Leopold, Ulrich; De Sousa, Luís Moreira; Schwartz, Lou; Tobias, Eric

    2018-03-01

    The increasing complexity of urban planning projects today requires new approaches to better integrate stakeholders with different professional backgrounds throughout a city. Traditional tools used in urban planning are designed for experts and offer little opportunity for participation and collaborative design. This paper introduces the concept of geospatial tangible user interfaces (GTUI) and reports on the design and implementation as well as the usability of such a GTUI to support stakeholder participation in collaborative urban planning. The proposed system uses physical objects to interact with large digital maps and geospatial data projected onto a tabletop. It is implemented using a PostGIS database, a web map server providing OGC web services, the computer vision framework reacTIVision, a Java-based TUIO client, and GeoTools. We describe how a GTUI has be instantiated and evaluated within the scope of two case studies related to real world collaborative urban planning scenarios. Our results confirm the feasibility of our proposed GTUI solutions to (a) instantiate different urban planning scenarios, (b) support collaboration, and (c) ensure an acceptable usability.

  10. Neal-Schuman Electronic Classroom Handbook.

    ERIC Educational Resources Information Center

    Hinchliffe, Lisa Janicke

    This book discusses planning, designing, and implementing electronic classrooms. Chapters cover: (1) background, including the definition of electronic classrooms, classroom types, and justifications; (2) planning, including planners and the planning process; (3) gathering and analyzing information, including instructional needs assessment,…

  11. Implementation of Age-Specific Services for Transition-Age Youths in California.

    PubMed

    Ojeda, Victoria D; Hiller, Sarah P; Hurst, Samantha; Jones, Nev; McMenamin, Sara; Burgdorf, James; Gilmer, Todd P

    2016-09-01

    This study examined the implementation of age-specific services for transition-age youths in California under the Mental Health Services Act (MHSA). This study employed a sequential, exploratory mixed-methods design. Qualitative interviews with 39 mental health service area administrators in California were analyzed to develop an understanding of how the MHSA has facilitated the development of youth-specific programs or services. A quantitative survey of 180 youth-focused programs was also used to describe the range of services that were implemented, the use of evidence-based and promising practices, and the role of youths in the design, planning, delivery, and evaluation of services. Administrators described the MHSA as providing a programmatic focus and financial support for youth-specific services, outlining a stakeholder process to create buy-in and develop a vision for services, and emphasizing the role of youths in service delivery and planning. Youth-specific programs implemented a diverse array of services, including general medical care; employment and education support; housing placement and support; and family, mentoring, and social support. Programs described implementing evidence-based and promising practices and involving youths in service planning, implementation, or quality improvement activities. The MHSA has had a substantial impact on the landscape of youth-specific services in California by expanding both the number of programs and the diversity in types of services and by promoting the engagement of youths in the planning and delivery of services. Additional efforts are necessary to determine the extent to which youth-specific services yield greater improvements in youths' outcomes compared with services designed for adults.

  12. Phase 2 design study of the electronic assembly for the HRUV spectrometer/polarimeter intended for the solar maximum mission. Implementation phase program plan, revision A

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The primary function of the implementation phase is to convert the ERA design of the design study phase into deliverable flight hardware. The development aspects of the experiment logic unit, the dual power converter, the junction box and the cables are considered.

  13. Community Education: A Community Planning Process Guide.

    ERIC Educational Resources Information Center

    Wiglesworth, Bill, Comp.

    Designed to assist in the planning of community education and services, this booklet offers an argument in support of as well as step-by-step implementation instructions for a 2-day planning process. Following a discussion of the advantages of cooperative planning, the community planning process is outlined. Examined next are the reasons why a…

  14. Concepts, requirements, and design approaches for building successful planning and scheduling systems

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller; Willoughby, John K.

    1991-01-01

    Traditional practice of systems engineering management assumes requirements can be precisely determined and unambiguously defined prior to system design and implementation; practice further assumes requirements are held static during implementation. Human-computer decision support systems for service planning and scheduling applications do not conform well to these assumptions. Adaptation to the traditional practice of systems engineering management are required. Basic technology exists to support these adaptations. Additional innovations must be encouraged and nutured. Continued partnership between the programmatic and technical perspective assures proper balance of the impossible with the possible. Past problems have the following origins: not recognizing the unusual and perverse nature of the requirements for planning and scheduling; not recognizing the best starting point assumptions for the design; not understanding the type of system that being built; and not understanding the design consequences of the operations concept selected.

  15. Planning and Implementing Social Service Information Systems: A Guide for Management and Users. Human Services Monograph Series Number 25. Project Share.

    ERIC Educational Resources Information Center

    Cotter, Barbara

    Intended to aid administrators and users of social services in establishing information systems, this comprehensive guide to the design of such systems identifies the elements, effective strategies, and potential pitfalls involved in their planning, implementation, and utilization. Detailed discussions of management strategies for system…

  16. Implementation of Head Start Planned Variation: 1970-1971. Part II.

    ERIC Educational Resources Information Center

    Lukas, Carol Van Deusen; Wohlleb, Cynthia

    This volume of appendices is Part II of a study of program implementation in 12 models of Head Start Planned Variation. It presents details of the data analysis, copies of data collection instruments, and additional analyses and statistics. The appendices are: (A) Analysis of Variance Designs, (B) Copies of Instruments, (C) Additional Analyses,…

  17. Galileo Station Keeping Strategy

    NASA Technical Reports Server (NTRS)

    Perez-Cambriles, Antonio; Bejar-Romero, Juan Antonio; Aguilar-Taboada, Daniel; Perez-Lopez, Fernando; Navarro, Daniel

    2007-01-01

    This paper presents analyses done for the design and implementation of the Maneuver Planning software of the Galileo Flight Dynamics Facility. The station keeping requirements of the constellation have been analyzed in order to identify the key parameters to be taken into account in the design and implementation of the software.

  18. Designing and Implementing Online Professional Development Workshops

    ERIC Educational Resources Information Center

    Kleiman, Glenn; Dash, Terry; Ethier, Denise; Johnson, Kirsten; Metrick, Susan; Treacy, Barbara

    2000-01-01

    This report provides useful information for those who are planning to incorporate online learning into professional development programs, as well as those who will design and implement online professional development activities. The Education Development center, Inc. (EDC) Center for Online Professional Education is continuing to explore this new…

  19. Designing Therapeutic Recreation Programs in the Community.

    ERIC Educational Resources Information Center

    Carter, Marcia Jean; And Others

    This publication is designed to assist in the development of therapeutic recreation services in the community and may also be used in the preparation of procedural manuals or risk management plans. Therapeutic recreation is defined as the process of assessment, planning, implementation, and evaluation, applied through a helping relationship to…

  20. 38 CFR 21.92 - Preparation of the plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... rehabilitation specialist, and the veteran. (c) Implementation of the plan. The vocational rehabilitation specialist or counseling psychologist designated as case manager has the primary role in carrying out...

  1. 24 CFR 598.420 - Periodic progress determinations.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF... evaluate the progress of implementation of the strategic plan in each designated Empowerment Zone on the...

  2. 77 FR 35652 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-14

    ... Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency..., Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S... Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental...

  3. 76 FR 78869 - Approval and Promulgation of Implementation Plans and Designations of areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ...-9460. 4. Mail: Steven Brown, Atmospheric Section, Air Planning and Development Branch, Air and Waste..., Kansas 66101. 5. Hand Delivery or Courier: Steven Brown, Atmospheric Section, Air Planning and... Atmospheric Section, Air Planning and Development Branch, Air Waste and Management Division, U.S...

  4. Installing a Microcomputer Lab in a Medium-Sized Academic Library.

    ERIC Educational Resources Information Center

    Hallman, Clark N.; And Others

    Designed to serve as a blueprint for other libraries developing plans for microcomputer facilities, this report describes the planning and implementation of a microcomputer laboratory at South Dakota State University's Hilton M. Briggs Library. The university's plan for installing microcomputer labs on campus and the initial planning process…

  5. 75 FR 10328 - Wolf Creek Nuclear Operating Corporation, Wolf Creek Generating Station; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... Plan, Safeguards Contingency Plan, and Cyber Security Plan referred to collectively hereafter as... its security plans. Pursuant to 10 CFR 51.32, ``Finding of no significant impact,'' the Commission has... by designing and implementing comprehensive site security programs. The amendments to 10 CFR 73.55...

  6. 40 CFR 256.65 - Recommendations for public participation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Public... designed to encourage informed public participation in the development and implementation of solid waste...

  7. 40 CFR 256.65 - Recommendations for public participation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Public... designed to encourage informed public participation in the development and implementation of solid waste...

  8. 40 CFR 256.65 - Recommendations for public participation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Public... designed to encourage informed public participation in the development and implementation of solid waste...

  9. 77 FR 26361 - Medicaid Program; State Plan Home and Community-Based Services, 5-Year Period for Waivers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-03

    ... services and receive Federal matching funds. As a result, States will be better able to design and tailor... design and tailor Medicaid services to better accommodate individual needs. This may result in improved... States to design and implement HCBS under the Medicaid State Plan. In April 4, 2008, we published a...

  10. Rapid Development: A Content Analysis Comparison of Literature and Purposive Sampling of AFRL Rapid Reaction Projects

    DTIC Science & Technology

    2011-12-01

    systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical

  11. Research in advanced formal theorem-proving techniques. [design and implementation of computer languages

    NASA Technical Reports Server (NTRS)

    Raphael, B.; Fikes, R.; Waldinger, R.

    1973-01-01

    The results are summarised of a project aimed at the design and implementation of computer languages to aid in expressing problem solving procedures in several areas of artificial intelligence including automatic programming, theorem proving, and robot planning. The principal results of the project were the design and implementation of two complete systems, QA4 and QLISP, and their preliminary experimental use. The various applications of both QA4 and QLISP are given.

  12. Opening the black box: a study of the process of NICE guidelines implementation.

    PubMed

    Spyridonidis, Dimitrios; Calnan, Michael

    2011-10-01

    This study informs 'evidence-based' implementation by using an innovative methodology to provide further understanding of the implementation process in the English NHS using two distinctly different NICE clinical guidelines as exemplars. The implementation process was tracked retrospectively and prospectively using a comparative case-study and longitudinal design. 74 unstructured interviews were carried out with 48 key informants (managers and clinicians) between 2007 and 2009. This study has shown that the NICE guidelines implementation process has both planned and emergent components, which was well illustrated by the use of the prospective longitudinal design in this study. The implementation process might be characterised as strategic and planned to begin with but became uncontrolled and subject to negotiation as it moved from the planning phase to adoption in everyday practice. The variations in the implementation process could be best accounted for in terms of differences in the structure and nature of the local organisational context. The latter pointed to the importance of managers as well as clinicians in decision-making about implementation. While national priorities determine the context for implementation the shape of the process is influenced by the interactions between doctors and managers, which influence the way they respond to external policy initiatives such as NICE guidelines. NICE and other national health policy-makers need to recognise that the introduction of planned change 'initiatives' in clinical practice are subject to social and political influences at the micro level as well as the macro level. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  13. Designing systematic conservation assessments that promote effective implementation: best practice from South Africa.

    PubMed

    Knight, Andrew T; Driver, Amanda; Cowling, Richard M; Maze, Kristal; Desmet, Philip G; Lombard, Amanda T; Rouget, Mathieu; Botha, Mark A; Boshoff, Andre F; Castley, J Guy; Goodman, Peter S; Mackinnon, Kathy; Pierce, Shirley M; Sims-Castley, Rebecca; Stewart, Warrick I; von Hase, Amrei

    2006-06-01

    Systematic conservation assessment and conservation planning are two distinct fields of conservation science often confused as one and the same. Systematic conservation assessment is the technical, often computer-based, identification of priority areas for conservation. Conservation planning is composed of a systematic conservation assessment coupled with processes for development of an implementation strategy and stakeholder collaboration. The peer-reviewed conservation biology literature abounds with studies analyzing the performance of assessments (e.g., area-selection techniques). This information alone, however can never deliver effective conservation action; it informs conservation planning. Examples of how to translate systematic assessment outputs into knowledge and then use them for "doing" conservation are rare. South Africa has received generous international and domestic funding for regional conservation planning since the mid-1990s. We reviewed eight South African conservation planning processes and identified key ingredients of best practice for undertaking systematic conservation assessments in a way that facilitates implementing conservation action. These key ingredients include the design of conservation planning processes, skills for conservation assessment teams, collaboration with stakeholders, and interpretation and mainstreaming of products (e.g., maps) for stakeholders. Social learning institutions are critical to the successful operationalization of assessments within broader conservation planning processes and should include not only conservation planners but also diverse interest groups, including rural landowners, politicians, and government employees.

  14. Smart Discipline for the Classroom: Respect and Cooperation Restored. Third Edition.

    ERIC Educational Resources Information Center

    Koenig, Larry

    This book helps teachers develop personal plans of action to handle classroom discipline, offering progressive Plan A and Plan B strategies. Plan A strategies take seconds to implement. Plan B strategies take more time but are designed to turn around specific attitudes and behaviors. After an introduction, there are 9 chapters: (1) "Misbehaviors…

  15. Ten steps to plan, design, and implement an endocrinology and endocrine surgery module for the Faculty of Medicine, Al-Baha University.

    PubMed

    Elfakey, Walyeldin Em; Al-Ghamdi, Ahmed H

    2016-01-01

    The Faculty of Medicine, Al-Baha University (FMBU), is a newly established medical school that implements a community-oriented and integrated system-based curriculum which is suitable for both medical students and serving the needs of the local community. The aim of this study is to describe the steps that were followed to plan, design, and implement an endocrinology and endocrine surgery module (EESM) for the fourth-year medical students, as an example of how system-based modules are designed at FMBU. Ten questions based on Harden's methodolgy were asked in order to design, plan, and implement an endocrinology and endocrine surgery module. The module committee determined the needs of the module and accordingly stated the aims and objectives of the module. The module planners selected the relevant contents, teaching methods, and assessment strategies and organized them. After addressing each of the ten questions, the results indicated the need, aim, objectives, and contents for the endocrinology and endocrine surgery module at FMBU. The implementation strategies were chosen according to the SPICES model. The teaching methods and the assessment strategies were selected and arranged. The module is well communicated at all levels, and the module committee used every effort to create a productive teaching environment. The module is well managed and follows the hierarchy of FMBU. Implementing Harden's ten steps methodology resulted in an integrated module of endocrinology and endocrine surgery where related disciplines and systems were merged and medical and surgical endocrine topics were included.

  16. Urban family physician plan in Iran: challenges of implementation in Kerman

    PubMed Central

    Dehnavieh, Reza; Kalantari, Ali Reza; Jafari Sirizi, Mohammad

    2015-01-01

    Background: The Family Physician Plan has recently been implemented in three provinces of Iran on a pilot basis and is going to be implemented throughout Iran in the future. Through a qualitative design, this study aims to determine probable implementation challenges of Family Physician Plan in Kerman. Methods: This study was conducted in Kerman in 2013. Data were collected through interviews with 21 experts in the field. Sampling continued until data saturation level was achieved. All interviews were recorded and then analyzed, and main themes and subgroups were extracted from them based on a framework analysis model. Results: most prevalent establishment challenges of Family Physician Plan were classified into policy-making, financial supply, laws and resources. Conclusion: The urban Family Physician Plan can be carried out more effectively by implementing this plan step by step, highlighting the relationships between the related organizations, using new payment mechanisms e.g Per Capita, DRG, make national commitment and proper educational programs for providers, development the health electronic Record, justifying providers and community about advantages of this plan, clarifying regulatory status about providers' Duties and most importantly considering a specific funding source. PMID:26913266

  17. A Manual for the Illinois Student Longitudinal Case Study System (ISLCS). Procedures and Materials for Planning and Implementing the ISLCS.

    ERIC Educational Resources Information Center

    Carvell, Fred; Carvell, Joan B.

    Designed for local school and district vocational educators, this manual contains instructions and materials necessary to plan and implement a student longitudinal followup system. Part 1 provides background information and definitions used in the system. In part 2 are described the 11 major activities that must be undertaken by local program…

  18. 78 FR 6741 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... Quality Standard (NAAQS); a State Implementation Plan (SIP) revision containing a 10-year ozone... emissions budgets (MVEBs) for the years 2008 and 2022 that are contained in the 10-year ozone maintenance... forth how the area will maintain attainment of the 1997 8-hour ozone NAAQS for the next 10 years in...

  19. An Implementation Plan: One-to-One Laptop Program Recommendations for the Pittsgrove Township School District

    ERIC Educational Resources Information Center

    Brodzik, Michael C.

    2012-01-01

    This Executive Position Paper is a one-to-one laptop implementation plan for Pittsgrove Township Schools that can be used as a template for other districts with similar interests. Each of the three chapters fulfills a major purpose. In Chapter One the paper is designed to substantiate the need for the Pittsgrove Township School District to…

  20. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel inmore » dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.« less

  1. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    NASA Technical Reports Server (NTRS)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  2. A Four-Stage Model for Planning Computer-Based Instruction.

    ERIC Educational Resources Information Center

    Morrison, Gary R.; Ross, Steven M.

    1988-01-01

    Describes a flexible planning process for developing computer based instruction (CBI) in which the CBI design is implemented on paper between the lesson design and the program production. A four-stage model is explained, including (1) an initial flowchart, (2) storyboards, (3) a detailed flowchart, and (4) an evaluation. (16 references)…

  3. 78 FR 78266 - Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... one year after the effective date of the nonattainment area (NAA) designations. See Section 40 CFR 51... \\1\\ currently applies to areas that are designated nonattainment and to areas that have been redesignated to attainment after 1990 (maintenance areas) with plans developed under section 175A of the Act...

  4. PC-based Multiple Information System Interface (PC/MISI) design plan

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Hall, Philip P.

    1985-01-01

    The general design plan for the implementation of a common user interface to multiple remote information systems within a microcomputer-based environment is presented. The intent is to provide a framework for the development of detailed specifications which will be used as guidelines for the actual development of the system.

  5. Implementation and local calibration of the MEPDG transfer functions in Wyoming.

    DOT National Transportation Integrated Search

    2015-11-01

    The Wyoming Department of Transportation (WYDOT) currently uses the empirical AASHTO Design for Design of : Pavement Structures as their standard pavement design procedure. WYDOT plans to transition to the Mechanistic : Empirical Pavement Design Guid...

  6. Reengineering the Project Design Process

    NASA Technical Reports Server (NTRS)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  7. Top Down Implementation Plan for system performance test software

    NASA Technical Reports Server (NTRS)

    Jacobson, G. N.; Spinak, A.

    1982-01-01

    The top down implementation plan used for the development of system performance test software during the Mark IV-A era is described. The plan is based upon the identification of the hierarchical relationship of the individual elements of the software design, the development of a sequence of functionally oriented demonstrable steps, the allocation of subroutines to the specific step where they are first required, and objective status reporting. The results are: determination of milestones, improved managerial visibility, better project control, and a successful software development.

  8. General Design Memorandum. Phase I and Environmental Impact Statement for Flood Control and Related Purposes, Sheyenne River, North Dakota.

    DTIC Science & Technology

    1982-01-01

    Cass Water Management District, and North Dakota State Water Commission, have testified to the severity of flooding along the lower Sheyenne River and...have requested study and implementation of alternatives to resolve these problems. Several interests testifying in opposition to the authorized Kindred...alternative was borderline . The plan is not considered implementable. 3.07 Plan K-2 - Plan K-2 consists of a reduced-size Kindred Dam, a 5- to 15

  9. Proceedings of the Symposium on GPS Applications in Space (2nd) Held in Bedford, Massachusetts on 10-11 October 1989. Volume 1

    DTIC Science & Technology

    1990-02-13

    Freedom GPS Implementation Plans - An Overview, Penny E. Saunders . . . . . .................. 95 Recent Results In High-Precision GPS Orbit Determination...Upperstages" 7. Penny Saunders (NASA Johnson Space Center): "Space Station GPS Implementation Plans and Overview" 12:00 - 13:30 LUNCH NCO Club vii 13...and design. In this phase we plan to do a ground demon- stration to determine experimentally what sort of attitude accuracy we can get from this

  10. IEC planning: eight state-of-the-art principles.

    PubMed

    Middleton, J

    1983-12-01

    Considerable experience and research has been accumulated in the last 20 years on the ways in which information/education/communication (IEC) programs can be effectively designed, implemented, and evaluated. Possibly more effort has focused on population and family planning IEC than on any other sectoral program of development communication. Several principles have emerged which, taken together, define the state of the art in the field. These principles provide a framework of experience which can guide the development of comprehensive IEC programs. They include: policy and resource assessment; audience analysis; strategy design; message research and pretesting; participation and feedback; management; evaluation; and collaboration. The nature of the national policy base for population and family planning programs will determine the goals and approaches of the IEC program. Strong policies of limitation on popultion growth lead to equally strong and pervasive IEC efforts designed to directly affect contraceptive behavior. Assessment of existing policy is an essential aspect of the design of an effective IEC program. Policies establish the rationale and boundaries for action. Population and family planning programs are concerned with some of the most intimate human behavior. Consequently, structured and sensitive audience analysis has become an integral part of the design of IEC programs. The design of communication strategy requires clearly stated objectives. Principles of human learning are used to structure information appropriately. Message research and pretesting have become integral components of the strategy design process. Small scale research on specific objectives is necessary to establish the basis for message design. Audience participation and feedback in remaining phases of program development and implementation are important. The management of an IEC program requires a specific combination of planning, flexibility, and creativity. Evaluation of program effects--identification of the degree of change toward stated objectives -- is critical to long term assessment of the underlying strategy and the identification both of needed corrections and new directions for the future. Collaboration with and involvement of stakeholders in the design and implementation of a national IEC program significantly raises the probability that support will be forthcoming. Taken together these 8 principles can become the basic building blocks of an effective population/family planning IEC program.

  11. 77 FR 69409 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-19

    ...-road motor vehicle insignificance finding that is included as part of Kentucky's maintenance plan for... Plan (SIP) revision containing a maintenance plan for the Kentucky portion of the Huntington-Ashland...-Ashland Area. EPA is also proposing to approve the on-road motor vehicle insignificance finding for direct...

  12. 78 FR 63937 - Approval and Promulgation of Implementation Plans; Approval and Promulgation of State Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... Quality Plans for Designated Facilities and Pollutants, State of Iowa; Control of Emissions From Existing Hospital/ Medical/Infectious Waste Incinerator Units, Negative Declaration and 111(d) Plan Rescission... declaration and withdrawal of its section 111(d)/129 plan for Hospital Medical Infectious Waste Incinerators...

  13. 40 CFR 96.211 - Alternate CAIR designated representative.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR Designated Representative for CAIR SO2 Sources § 96.211 Alternate CAIR designated...

  14. Sample transportation management plans and templates.

    DOT National Transportation Integrated Search

    2010-08-01

    This Guide consisting of samples, templates, and tips is designed to help transportation agencies with the : development and implementation of their own Transportation Management Plans (TMPs). Understanding : the work zone impacts is critical to deve...

  15. [Design of a plan for patient safety in pediatric surgery service].

    PubMed

    Paredes Esteban, R M; Castillo Fernández, A L; Miñarro del Moral, R; Garrido Pérez, J I; Granero Cendón, R; Gómez Beltrán, O; Berenguer Garcia, M J; Tejedor Fernández, M

    2014-10-01

    Patient safety is a key priority in quality management for healthcare services providers. Every patient is entitled to receive safe and effective healthcare. The aim of this study was to design a patient safety plan for a Paediatric Surgery Department. We carried out a literature review and we established a work group that included healthcare professionals from the Paediatric Surgery Department and the Quality and Medical Records Department. The group identified potential adverse events, failures and causes and established a rating using Failure Mode Effects Analysis. Potential risks were mapped out and a plan was designed establishing actions to reduce risks. We designated leaders to ensure the effective implementation of the plan. A total of 58 adverse events were identified in the Paediatric Surgery Department. We detected 128 failures that were produced by 211 different causes. The group developed a proposal with 424 specific measures to carry out preventive and/or remedial actions that were then narrowed down to 322. The group designed a plan to apply the programme, which is currently being implemented. The methodology used enabled obtaining key information for improvement of patient safety and developing preventive and/or remedial actions. These measures are applicable in practice, as they were designed using proposals and agreements with professionals that take active part in the care of children with surgical conditions.

  16. Tank waste remediation system privatization infrastructure program, configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

  17. Method and Tool for Design Process Navigation and Automatic Generation of Simulation Models for Manufacturing Systems

    NASA Astrophysics Data System (ADS)

    Nakano, Masaru; Kubota, Fumiko; Inamori, Yutaka; Mitsuyuki, Keiji

    Manufacturing system designers should concentrate on designing and planning manufacturing systems instead of spending their efforts on creating the simulation models to verify the design. This paper proposes a method and its tool to navigate the designers through the engineering process and generate the simulation model automatically from the design results. The design agent also supports collaborative design projects among different companies or divisions with distributed engineering and distributed simulation techniques. The idea was implemented and applied to a factory planning process.

  18. SAVY-4000 Surveillance and Life Extension Program Fiscal Year 2013 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, Timothy A.; Blair, Michael W.; Weis, Eric

    2014-03-03

    The Packaging Surveillance Program section of the DOE M441.1-1 /sup>1, Nuclear Material Packaging Manual (DOE, 2008) requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” In order to ensure continuing safe storage of nuclear material and the maximization of risk reduction, TA-55 has established a Surveillance Program to ensure storage container integrity for operations within its specified design life. The LANL SAVY-4000 Field Surveillance Plan2 defines the near-term field surveillance plan for SAVY-4000 containers as required by the Manual. A long-term surveillance planmore » will be established based on the results of the first several years of surveillance and the results of the lifetime extension studies as defined in the Accelerated Aging Plan3. This report details progress in positioning the Surveillance Program for successful implementation in FY14 and status of the Design Life Extension Program in terms of its implementation and data collection for FY13.« less

  19. 78 FR 33230 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-04

    ...'') section 110(k)(3), EPA is approving a maintenance plan for the 1997 8-hour ozone standard (``San Diego 8-hour maintenance plan'') for the San Diego County 1997 ozone nonattainment area (``San Diego 8-hour... maintenance plan is included in a document titled Redesignation Request and Maintenance Plan for the 1997...

  20. Design and implementation of a web-based patient portal linked to an ambulatory care electronic health record: patient gateway for diabetes collaborative care.

    PubMed

    Grant, Richard W; Wald, Jonathan S; Poon, Eric G; Schnipper, Jeffrey L; Gandhi, Tejal K; Volk, Lynn A; Middleton, Blackford

    2006-10-01

    Despite the availability of expert guidelines and widespread diabetes quality improvement efforts, care of patients with diabetes remains suboptimal. Two key barriers to care that may be amenable to informatics-based interventions include (1) lack of patient engagement with therapeutic care plans and (2) lack of medication adjustment by physicians ("clinical inertia") during clinical encounters. The authors describe the conceptual framework, design, implementation, and analysis plan for a diabetes patient web-portal linked directly to the electronic health record (EHR) of a large academic medical center via secure Internet access designed to overcome barriers to effective diabetes care. Partners HealthCare System (Boston, MA), a multi-hospital health care network comprising several thousand physicians caring for over 1 million individual patients, has developed a comprehensive patient web-portal called Patient Gateway that allows patients to interact directly with their EHR via secure Internet access. Using this portal, a specific diabetes interface was designed to maximize patient engagement by importing the patient's current clinical data in an educational format, providing patient-tailored decision support, and enabling the patient to author a "Diabetes Care Plan." The physician view of the patient's Diabetes Care Plan was designed to be concise and to fit into typical EHR clinical workflow. We successfully designed and implemented a Diabetes Patient portal that allows direct interaction with our system's EHR. We are assessing the impact of this advanced informatics tool for collaborative diabetes care in a clinic-randomized controlled trial among 14 primary care practices within our integrated health care system.

  1. NASA's Radioisotope Power Systems - Plans

    NASA Technical Reports Server (NTRS)

    Hamley, John A.; Mccallum, Peter W.; Sandifer, Carl E., II; Sutliff, Thomas J.; Zakrajsek, June F.

    2015-01-01

    NASA's Radioisotope Power Systems (RPS) Program continues to plan and implement content to enable planetary exploration where such systems could be needed, and to prepare more advanced RPS technology for possible infusion into future power systems. The 2014-2015 period saw significant changes, and strong progress. Achievements of near-term objectives have enabled definition of a clear path forward in which payoffs from research investments and other sustaining efforts can be applied. The future implementation path is expected to yield a higher-performing thermoelectric generator design, a more isotope-fuel efficient system concept design, and a robust RPS infrastructure maintained effectively within both NASA and the Department of Energy. This paper describes recent work with an eye towards the future plans that result from these achievements.

  2. Development of Continuing Nursing Education Offerings for the World Wide Web.

    ERIC Educational Resources Information Center

    Billings, Diane M.; Rowles, Connie J.

    2001-01-01

    Describes steps for web-based continuing education courses in terms of planning (strategic plan, website development, resource team, marketing plan), implementing (course design, web-based tools, copyright and intellectual property), and evaluating (pilot test, formative/summative evaluation, continuous quality improvement). (Contains 16…

  3. [Integration of the radiotherapy irradiation planning in the digital workflow].

    PubMed

    Röhner, F; Schmucker, M; Henne, K; Momm, F; Bruggmoser, G; Grosu, A-L; Frommhold, H; Heinemann, F E

    2013-02-01

    At the Clinic of Radiotherapy at the University Hospital Freiburg, all relevant workflow is paperless. After implementing the Operating Schedule System (OSS) as a framework, all processes are being implemented into the departmental system MOSAIQ. Designing a digital workflow for radiotherapy irradiation planning is a large challenge, it requires interdisciplinary expertise and therefore the interfaces between the professions also have to be interdisciplinary. For every single step of radiotherapy irradiation planning, distinct responsibilities have to be defined and documented. All aspects of digital storage, backup and long-term availability of data were considered and have already been realized during the OSS project. After an analysis of the complete workflow and the statutory requirements, a detailed project plan was designed. In an interdisciplinary workgroup, problems were discussed and a detailed flowchart was developed. The new functionalities were implemented in a testing environment by the Clinical and Administrative IT Department (CAI). After extensive tests they were integrated into the new modular department system. The Clinic of Radiotherapy succeeded in realizing a completely digital workflow for radiotherapy irradiation planning. During the testing phase, our digital workflow was examined and afterwards was approved by the responsible authority.

  4. District Awards for Teacher Excellence (D.A.T.E.) Program: Final Evaluation Report. [Executive Summary

    ERIC Educational Resources Information Center

    Springer, Matthew G.; Lewis, Jessica L.; Ehlert, Mark W.; Podgursky, Michael J.; Crader, Gary D.; Taylor, Lori L.; Gronberg, Timothy J.; Jansen, Dennis W.; Lopez, Omar S.; Stuit, David A.

    2010-01-01

    District Awards for Teacher Excellence (D.A.T.E.) is a state-funded program in Texas that provides grants to districts for the implementation of locally-designed incentive pay plans. All districts in the state are eligible to receive grants, but participation is voluntary. D.A.T.E. incentive pay plans were first implemented in Texas districts…

  5. District Awards for Teacher Excellence (D.A.T.E.) Program: Final Evaluation Report. Policy Evaluation Report

    ERIC Educational Resources Information Center

    Springer, Matthew G.; Lewis, Jessica L.; Ehlert, Mark W.; Podgursky, Michael J.; Crader, Gary D.; Taylor, Lori L.; Gronberg, Timothy J.; Jansen, Dennis W.; Lopez, Omar S.; Stuit, David A.

    2010-01-01

    District Awards for Teacher Excellence (D.A.T.E.) is a state-funded program in Texas that provides grants to districts for the implementation of locally-designed incentive pay plans. All districts in the state are eligible to receive grants, but participation is voluntary. D.A.T.E. incentive pay plans were first implemented in Texas districts…

  6. Looking to the future: Framing the implementation of interprofessional education and practice with scenario planning.

    PubMed

    Forman, Dawn; Nicol, Pam; Nicol, Paul

    2015-01-01

    Adapting to interprofessional education and practice requires a change of perspective for many health professionals. We aimed to explore the potential of scenario planning to bridge the understanding gap and framing strategic planning for interprofessional education (IPE) and practice (IPP), as well as to implement innovative techniques and technology for large-group scenario planning. A full-day scenario planning workshop incorporating innovative methodology was designed and offered to participants. The 71 participants included academics from nine universities, as well as service providers, government, students and consumer organisations. The outcomes were evaluated by statistical and thematic analysis of a mixed method survey questionnaire. The scenario planning method resulted in a positive response as a means of collaboratively exploring current knowledge and broadening entrenched attitudes. It was perceived to be an effective instrument for framing strategy for the implementation of IPE/IPP, with 81 percent of respondents to a post-workshop survey indicating they would consider using scenario planning in their own organisations. The scenario planning method can be used by tertiary academic institutions as a strategy in developing, implementing and embedding IPE, and for the enculturation of IPP in practice settings.

  7. Models, Strategies, and Tools: Theory in Implementing Evidence-Based Findings into Health Care Practice

    PubMed Central

    Sales, Anne; Smith, Jeffrey; Curran, Geoffrey; Kochevar, Laura

    2006-01-01

    This paper presents a case for careful consideration of theory in planning to implement evidence-based practices into clinical care. As described, theory should be tightly linked to strategic planning through careful choice or creation of an implementation framework. Strategies should be linked to specific interventions and/or intervention components to be implemented, and the choice of tools should match the interventions and overall strategy, linking back to the original theory and framework. The thesis advanced is that in most studies where there is an attempt to implement planned change in clinical processes, theory is used loosely. An example of linking theory to intervention design is presented from a Mental Health Quality Enhancement Research Initiative effort to increase appropriate use of antipsychotic medication among patients with schizophrenia in the Veterans Health Administration. PMID:16637960

  8. Models, strategies, and tools. Theory in implementing evidence-based findings into health care practice.

    PubMed

    Sales, Anne; Smith, Jeffrey; Curran, Geoffrey; Kochevar, Laura

    2006-02-01

    This paper presents a case for careful consideration of theory in planning to implement evidence-based practices into clinical care. As described, theory should be tightly linked to strategic planning through careful choice or creation of an implementation framework. Strategies should be linked to specific interventions and/or intervention components to be implemented, and the choice of tools should match the interventions and overall strategy, linking back to the original theory and framework. The thesis advanced is that in most studies where there is an attempt to implement planned change in clinical processes, theory is used loosely. An example of linking theory to intervention design is presented from a Mental Health Quality Enhancement Research Initiative effort to increase appropriate use of antipsychotic medication among patients with schizophrenia in the Veterans Health Administration.

  9. Optimal Assignment Methods in Three-Form Planned Missing Data Designs for Longitudinal Panel Studies

    ERIC Educational Resources Information Center

    Jorgensen, Terrence D.; Rhemtulla, Mijke; Schoemann, Alexander; McPherson, Brent; Wu, Wei; Little, Todd D.

    2014-01-01

    Planned missing designs are becoming increasingly popular, but because there is no consensus on how to implement them in longitudinal research, we simulated longitudinal data to distinguish between strategies of assigning items to forms and of assigning forms to participants across measurement occasions. Using relative efficiency as the criterion,…

  10. Massachusetts Public Fire and Safety Education Curriculum Planning Guidebook. Second Version.

    ERIC Educational Resources Information Center

    Massachusetts Department of Fire Services, Stow.

    This updated curriculum planning guidebook is a resource for fire educators throughout the state of Massachusetts. It is designed to be a tool in efforts to: identify fire problems in the community; select appropriate behaviors and lessons to correct the fire problems; design fire education programs; and implement and evaluate the programs. The…

  11. Reforming private drug coverage in Canada: inefficient drug benefit design and the barriers to change in unionized settings.

    PubMed

    O'Brady, Sean; Gagnon, Marc-André; Cassels, Alan

    2015-02-01

    Prescription drugs are the highest single cost component for employees' benefits packages in Canada. While industry literature considers cost-containment for prescription drug costs to be a priority for insurers and employers, the implementation of cost-containment measures for private drug plans in Canada remains more of a myth than a reality. Through 18 semi-structured phone interviews conducted with experts from private sector companies, unions, insurers and plan advisors, this study explores the reasons behind this incapacity to implement cost-containment measures by examining how private sector employers negotiate drug benefit design in unionized settings. Respondents were asked questions on how employee benefits are negotiated; the relationships between the players who influence drug benefit design; the role of these players' strategies in influencing plan design; the broad system that underpins drug benefit design; and the potential for a universal pharmacare program in Canada. The study shows that there is consensus about the need to educate employees and employers, more collaboration and data-sharing between these two sets of players, and for external intervention from government to help transform established norms in terms of private drug plan design. Copyright © 2014 The Authors. Published by Elsevier Ireland Ltd.. All rights reserved.

  12. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 4: Solar electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  13. Design and utilization of a Flight Test Engineering Database Management System at the NASA Dryden Flight Research Facility

    NASA Technical Reports Server (NTRS)

    Knighton, Donna L.

    1992-01-01

    A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.

  14. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 2: Cryo/aerobrake vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  15. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 5: Nuclear electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  16. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 3: Nuclear thermal rocket vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  17. 75 FR 54031 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... below. FOR FURTHER INFORMATION CONTACT: Doris Lo, EPA Region IX, (415) 972- 3959, lo[email protected] Meredith Kurpius, EPA Region 9, Air Quality Assessment Office, to Doris Lo, EPA Region 9, Air Planning... Officer, GBUAPCD, to Doris Lo, EPA Region 9, Air Planning Office, with attachments. The Coso Operating...

  18. Developing State Agency Facility Plans: A Guide to Planning and Implementation. Michigan Studies in Rehabilitation Utilization Series: 4.

    ERIC Educational Resources Information Center

    Miller, Juliet V.; Wargel, James F.

    Intended for use in inservice training of vocational rehabilitation agency personnel, this facility planning guide is designed to (1) help state agencies understand the new facility planning requirements of the Rehabilitation Comprehensive Services and Developmental Disabilities Amendments of 1978, (2) provide information about a six-step planning…

  19. Career Exploration Occupational Information for the Junior High/Middle School. A Planning Curriculum Guide.

    ERIC Educational Resources Information Center

    Lawson, Dorothy M.; McDonald, Dorothea V.

    Materials contained in this guide are designed to be used in planning a comprehensive career education program and for developing individual career education units for grades 6-9. Section 1 is the planning guide and contains strategies for organizing, planning, and implementing a program, developing staff inservice, conducting a needs assessment,…

  20. 77 FR 34819 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... to inclusion of CSAPR as a potential contingency measure in Illinois' ozone maintenance plan. In..., after promulgation by USEPA'' as a possible contingency measure in the maintenance plan, this measure is only one of many that may be selected should the contingency plan be triggered. EPA has concluded, in...

  1. Management Information System Based on the Balanced Scorecard

    ERIC Educational Resources Information Center

    Kettunen, Juha; Kantola, Ismo

    2005-01-01

    Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…

  2. Work zone and operation enhancements.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  3. Assessing the Progress of New American Schools: A Status Report.

    ERIC Educational Resources Information Center

    Berends, Mark

    This report presents a data-collection plan for addressing these questions: (1) What were the New American Schools (NAS) like before they implemented their restructuring design efforts? (2) How have these evolved over time? (3) Are the critical components of the NAS designs being implemented across a wide array of schools? (4) Do the NAS designs…

  4. Improving Treatment Plan Implementation in Schools: A Meta-Analysis of Single Subject Design Studies

    ERIC Educational Resources Information Center

    Noell, George H.; Gansle, Kristin A.; Mevers, Joanna Lomas; Knox, R. Maria; Mintz, Joslyn Cynkus; Dahir, Amanda

    2014-01-01

    Twenty-nine peer-reviewed journal articles that analyzed intervention implementation in schools using single-case experimental designs were meta-analyzed. These studies reported 171 separate data paths and provided 3,991 data points. The meta-analysis was accomplished by fitting data extracted from graphs in mixed linear growth models. This…

  5. 78 FR 65739 - Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment to the Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70765; File No. 4-443] Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment to the Plan for the Purpose of Developing and Implementing Procedures Designed To Facilitate the Listing and Trading of Standardized Options To Add Topaz Exchange, LLC as a Plan Sponsor October...

  6. 78 FR 1149 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... CONTACT section. FOR FURTHER INFORMATION CONTACT: Ginger Vagenas, Air Planning Office (AIR-2), U.S. Environmental Protection Agency, Region IX, (415) 972- 3964, vagenas.ginger@epa.gov . SUPPLEMENTARY INFORMATION...

  7. Assessing environmental assets for health promotion program planning: a practical framework for health promotion practitioners

    PubMed Central

    Springer, Andrew E.; Evans, Alexandra E.

    2016-01-01

    Conducting a health needs assessment is an important if not essential first step for health promotion planning. This paper explores how health needs assessments may be further strengthened for health promotion planning via an assessment of environmental assets rooted in the multiple environments (policy, information, social and physical environments) that shape health and behavior. Guided by a behavioral-ecological perspective- one that seeks to identify environmental assets that can influence health behavior, and an implementation science perspective- one that seeks to interweave health promotion strategies into existing environmental assets, we present a basic framework for assessing environmental assets and review examples from the literature to illustrate the incorporation of environmental assets into health program design. Health promotion practitioners and researchers implicitly identify and apply environmental assets in the design and implementation of health promotion interventions;this paper provides foundation for greater intentionality in assessing environmental assets for health promotion planning. PMID:27579254

  8. Assessing environmental assets for health promotion program planning: a practical framework for health promotion practitioners.

    PubMed

    Springer, Andrew E; Evans, Alexandra E

    2016-01-01

    Conducting a health needs assessment is an important if not essential first step for health promotion planning. This paper explores how health needs assessments may be further strengthened for health promotion planning via an assessment of environmental assets rooted in the multiple environments (policy, information, social and physical environments) that shape health and behavior. Guided by a behavioral-ecological perspective- one that seeks to identify environmental assets that can influence health behavior, and an implementation science perspective- one that seeks to interweave health promotion strategies into existing environmental assets, we present a basic framework for assessing environmental assets and review examples from the literature to illustrate the incorporation of environmental assets into health program design. Health promotion practitioners and researchers implicitly identify and apply environmental assets in the design and implementation of health promotion interventions;this paper provides foundation for greater intentionality in assessing environmental assets for health promotion planning.

  9. Trajectory Generation and Path Planning for Autonomous Aerobots

    NASA Technical Reports Server (NTRS)

    Sharma, Shivanjli; Kulczycki, Eric A.; Elfes, Alberto

    2007-01-01

    This paper presents global path planning algorithms for the Titan aerobot based on user defined waypoints in 2D and 3D space. The algorithms were implemented using information obtained through a planner user interface. The trajectory planning algorithms were designed to accurately represent the aerobot's characteristics, such as minimum turning radius. Additionally, trajectory planning techniques were implemented to allow for surveying of a planar area based solely on camera fields of view, airship altitude, and the location of the planar area's perimeter. The developed paths allow for planar navigation and three-dimensional path planning. These calculated trajectories are optimized to produce the shortest possible path while still remaining within realistic bounds of airship dynamics.

  10. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.« less

  11. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.« less

  12. Managing aggression in a psychiatric hospital using a behaviour plan: a case study.

    PubMed

    Bisconer, S W; Green, M; Mallon-Czajka, J; Johnson, J S

    2006-10-01

    This paper focuses on the critical role of nursing in implementing a behaviour plan in a psychiatric hospital. The plan was implemented with a 40-year-old man with a long history of aggression towards others and self. The study used a single-subject research design with baseline and intervention phases (AB Design). Data were collected on (1) frequency of incidents of aggression towards others and self; (2) use of restrictive interventions to manage aggression (i.e. restraints, pro re nata medication, 1:1 special observation); and (3) frequency of staff injury. The data show a decrease in frequency of aggression towards others and self, a concurrent reduction in the use of restrictive interventions to manage aggression, and a decrease in incidents of staff injury. The behaviour plan helped staff maintain a safe and therapeutic milieu. The behaviour plan has given the patient an opportunity to learn positive replacement behaviours and skills, and the opportunity eventually to leave the hospital to live in a less restrictive community home.

  13. The implementation of the integrated design process in the hole-plan system

    NASA Astrophysics Data System (ADS)

    Ruy, Won-Sun; Ko, Dae-Eun; Yang, Young-Soon

    2012-12-01

    All current shipyards are using the customized CAD/CAM programs in order to improve the design quality and increase the design efficiency. Even though the data structures for ship design and construction are almost completed, the implementation related to the ship design processes are still in progress so that it has been the main causes of the bottleneck and delay during the middle of design process. In this study, we thought that the hole-plan system would be a good example which is remained to be improved. The people of outfitting division who don't have direct authority to edit the structural panels, should request the hull design division to install the holes for the outfitting equipment. For acceptance, they should calculate the hole position, determine the hole type, and find the intersected contour of panel. After consideration of the hull people, the requested holes are manually installed on the hull structure. As the above, many processes are needed such as communication and discussion between the divisions, drawings for hole-plan, and the consideration for the structural or production compatibility. However this iterative process takes a lot of working time and requires mental pressure to the related people and cross-division conflict. This paper will handle the hole-plan system in detail to automate the series of process and minimize the human efforts and time-consumption.

  14. Information technology from novice to expert: implementation implications.

    PubMed

    Courtney, Karen L; Alexander, Gregory L; Demiris, George

    2008-09-01

    This paper explores how the Novice-to-Expert Nursing Practice framework can illuminate the challenges of and opportunities in implementing information technology (IT), such as clinical decision support systems (CDSS), in nursing practice. IT implementation in health care is increasing; however, substantial costs and risks remain associated with these projects. The theoretical framework of Novice-to-Expert Nursing Practice was applied to current design and implementation literature for CDSS. Organizational policies and CDSS design affect implementation and user adoption. Nursing CDSS can improve the overall quality of care when designed for the appropriate end-user group and based on a knowledge base reflecting nursing expertise. Nurse administrators can positively influence CDSS function and end-user acceptance by participating in and facilitating staff nurse involvement in IT design, planning and implementation. Specific steps for nurse administrators and managers are included in this paper.

  15. Paratransit Handbook : a Guide to Paratransit Implementation : Volume 1. Parts 1-3.

    DOT National Transportation Integrated Search

    1979-01-01

    This Paratransit Handbook has been developed to aid public officials, planners and system operators in planning, designing, implementing, operating and evaluating integrated paratransit systems. The Handbook represents a compedium of techniques and e...

  16. Systems Analysis of Rapid Transit Underground Construction : Volume 1. Sections 1-5.

    DOT National Transportation Integrated Search

    1974-12-01

    This study describes rapid transit system implementation, design, and construction procedures. The relationships and responsibilities of governmental, private, and public groups involved in planning and implementing an urban rapid transit system are ...

  17. IMPLEMENTING PRACTICAL PICO-HYDROPOWER

    EPA Science Inventory

    Deliverables for this proposal will be energy output data modeled from experimental testing of the hydropower unit and monitoring of the stormwater handling infrastructure in the GIS building; along with a design and engineering plan for implementation and building integrat...

  18. 50 CFR 600.1004 - Accepting a request for, and determinations about initiating, a financed program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... design, propose, and adopt a timely and reliable implementation plan as well as propose and issue timely and reliable implementation regulations and otherwise complete the program in accordance with this...

  19. Space station MSFC-DPD-235/DR no. MA-05 phase C/D program development plan. Volume 2: Phase C/D, programmatic requirements

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The design plan requirements define the design implementation and control requirements for Phase C/D of the Modular Space Station Project and specifically address the Initial Space Station phase of the Space Station Program (modular). It is based primarily on the specific objective of translating the requirements of the Space Station Program, Project, Interface, and Support Requirements and preliminary contract end x item specifications into detail design of the operational systems which comprise the initial space station. This document is designed to guide aerospace contractors in the planning and bidding for Phase C/D.

  20. 78 FR 72036 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... maintenance plan to the year 2025 and updating the sub-area motor vehicle emission budgets (MVEBs) for... taking? III. Why is EPA taking these actions? IV. What are the effects of these actions? V. Final Action... design values Location County Monitor ID 2008 2009 2010 2008-2010 Lincoln County Replacing Iron Station...

  1. The Planning of In-Service Workshops: A Seminar (Atlanta, Feb. 14-17, 1971).

    ERIC Educational Resources Information Center

    Southern Regional Education Board, Atlanta, GA.

    This document is a summation of a workshop designed to be a planning experience for ABE training personnel. It also contains a sampling of model training designs developed by the participants for inservice work. The object of the seminar was to provide an overview of relevant techniques and procedures for developing and implementing short-term…

  2. Shuttle free-flying teleoperator system experiment definition. Volume 3: program development requirements

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.

  3. Role of motor vehicle emission controls in state implementation plans

    DOT National Transportation Integrated Search

    2000-01-01

    The American Association of State Highway and Transportation Official's (AASHTO) Guide for the Design of Pavement Structures is widely used in the design of new and rehabilitated highway pavements. However, the current Design Guide, published in 1993...

  4. Design and Implementation of an International Training Program on Repository Development and Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vugrin, K.W.; Twitchell, Ch.A.

    2008-07-01

    Korea Hydro and Nuclear Power Co., Ltd. (KHNP) is an electric company in the Republic of Korea with twenty operational nuclear power plants and eight additional units that are either planned or currently under construction. Regulations require that KHNP manage the radioactive waste generated by their nuclear power plants. In the course of planning low, intermediate, and high level waste storage facilities, KHNP sought interaction with an acknowledged expert in the field of radioactive waste management and, consequently, contacted Sandia National Laboratories (SNL). KHNP has contracted with SNL to provide a year long training program on repository science. This papermore » discusses the design of the curriculum, specific plans for execution of the training program, and recommendations for smooth implementation of international training programs. (authors)« less

  5. A procedural model for planning and evaluating behavioral interventions.

    PubMed

    Hyner, G C

    2005-01-01

    A model for planning, implementing and evaluating health behavior change strategies is proposed. Variables are presented which can be used in the model or serve as examples for how the model is utilized once a theory of health behavior is adopted. Examples of three innovative strategies designed to influence behavior change are presented so that the proposed model can be modified for use following comprehensive screening and baseline measurements. Three measurement priorities: clients, methods and agency are subjected to three phases of assessment: goals, implementation and effects. Lifestyles account for the majority of variability in quality-of-life and premature morbidity and mortality. Interventions designed to influence healthy behavior changes must be driven by theory and carefully planned and evaluated. The proposed model is offered as a useful tool for the behavior change strategist.

  6. 78 FR 65733 - Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment to the Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70764; File No. 4-443] Joint Industry Plan; Notice of Filing and Immediate Effectiveness of Amendment to the Plan for the Purpose of Developing and Implementing Procedures Designed To Facilitate the Listing and Trading of Standardized Options To Add Miami International Securities Exchange, LLC (...

  7. 75 FR 36023 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... a Maintenance Plan, Including a Contingency Plan, for the Area Under Section 175a of the CAA 1. An.... Contingency Provisions That EPA Deems Necessary to Promptly Correct Any Violation of the NAAQS That Occurs... available control measures, and contingency measures) no longer applies for so long as the area continues to...

  8. Facility Upgrade/Replacement Tasks ('planned') at the NASA Glenn Research Center 10x10 Supersonic Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Giriunas, Julius A.

    2012-01-01

    Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.

  9. From good ideas to actions: a model-driven community collaborative to prevent childhood obesity.

    PubMed

    Huberty, Jennifer L; Balluff, Mary; O'Dell, Molly; Peterson, Kerri

    2010-01-01

    Activate Omaha Kids, a community collaborative, was designed, implemented, and evaluated with the aim of preventing childhood obesity in the Omaha community. Activate Omaha Kids brought together key stakeholders and community leaders to create a community coalition. The coalition's aim was to oversee a long-term sustainable approach to preventing obesity. Following a planning phase, a business plan was developed that prioritized best practices to be implemented in Omaha. The business plan was developed using the Ecological Model, Health Policy Model, and Robert Wood Johnson Foundation Active Living by Design 5P model. The three models helped the community identify target populations and activities that then created a single model for sustainable change. Twenty-four initiatives were identified, over one million dollars in funding was secured, and evaluation strategies were identified. By using the models from the initial steps through evaluation, a clear facilitation of the process was possible, and the result was a comprehensive, feasible plan. The use of the models to design a strategic plan was pivotal in building a sustainable coalition to achieve measurable improvements in the health of children and prove replicable over time.

  10. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  11. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  12. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  13. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  14. 77 FR 16447 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ...: These technical amendments are effective on March 21, 2012. FOR FURTHER INFORMATION CONTACT: Doris Lo, EPA Region IX, (415) 972- 3959, lo[email protected] . SUPPLEMENTARY INFORMATION: Technical Amendment for...

  15. Plan for the design, development, and implementation, and operation of the National Water Information System

    USGS Publications Warehouse

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  16. What happened to the no-wait hospital? A case study of implementation of operational plans for reduced waits.

    PubMed

    Hansson, Johan; Tolf, Sara; Øvretveit, John; Carlsson, Jan; Brommels, Mats

    2012-01-01

    Both research and practice show that waiting lists are hard to reduce. Implementing complex interventions for reduced waits is an intricate and challenging process that requires special attention for surrounding factors helping and hindering the implementation. This article reports a case study of a hospital implementation of operational plans for reduced waits, with an emphasis on the process of change. A case study research design, theoretically informed by the Pettigrew and Whipp model of strategic change, was applied. Data were gathered from individual and focus group interviews with informants from different organizational levels at different times and from documents and plans. The findings revealed arrangements both helping and hindering the implementation work. Helping factors were the hospital's contemporary savings requirements and experiences from similar change initiatives. Those hindering the actions to plan and agree the changes were unclear support functions and unclear task prioritization. One contribution of this study is to demonstrate the advantages, disadvantages, and challenges of a contextualized case study for increased understanding of factors influencing organizational change implementation. One lesson for current policy is to regard context factors that are critical for successful implementation.

  17. Developing a Career Planning Center. Occupational Education Research Project Final Report.

    ERIC Educational Resources Information Center

    Kidd, Frank E.; Embry, Judy K.

    Designed as a guide for those community college institutions developing a career planning center, this handbook presents a model for planning and implementing such a center. Options for centers are suggested for three levels of development and staffing: self-directed, intermediate, and comprehensive. Chapter 1 outlines the rationale and possible…

  18. 78 FR 45152 - Approval and Promulgation of Implementation Plans and Designation of Areas; North Carolina...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... available control measures (RACM), a reasonable further progress (RFP) plan, \\2\\ contingency measures, a..., contingency measures, and other planning SIP revisions related to attainment of the standard were suspended as...,'' Memorandum from G. T. Helms, Chief, Ozone/Carbon Monoxide Programs Branch, April 30, 1992; 3. ``Contingency...

  19. The Application of Concurrent Engineering Tools and Design Structure Matrix in Designing Tire

    NASA Astrophysics Data System (ADS)

    Ginting, Rosnani; Fachrozi Fitra Ramadhan, T.

    2016-02-01

    The development of automobile industry in Indonesia is growing rapidly. This phenomenon causes companies related to the automobile industry such as tire industry must develop products based on customers’ needs and considering the timeliness of delivering the product to the customer. It could be reached by applying strategic planning in developing an integrated concept of product development. This research was held in PT. XYZ that applied the sequential approach in designing and developing products. The need to improve in one stage of product development could occur re-designing that needs longer time in developing a new product. This research is intended to get an integrated product design concept of tire pertaining to the customer's needs using Concurrent Engineering Tools by implementing the two-phased of product development. The implementation of Concurrent Engineering approach results in applying the stage of project planning, conceptual design, and product modules. The product modules consist of four modules that using Product Architecture - Design Structure Matrix to ease the designing process of new product development.

  20. Irrigation Training Manual. Planning, Design, Operation, and Management of Small-Scale Irrigation Systems [and] Irrigation Reference Manual. A Technical Reference to Be Used with the Peace Corps Irrigation Training Manual T0076 in the Selection, Planning, Design, Operation, and Management of Small-Scale Irrigation Systems.

    ERIC Educational Resources Information Center

    Salazar, LeRoy; And Others

    This resource for trainers involved in irrigated agriculture training for Peace Corps volunteers consists of two parts: irrigation training manual and irrigation reference manual. The complete course should fully prepare volunteers serving as irrigation, specialists to plan, implement, evaluate and manage small-scale irrigation projects in arid,…

  1. Implementation of an Innovative Teaching Project in a Chemical Process Design Course at the University of Cantabria, Spain

    ERIC Educational Resources Information Center

    Galan, Berta; Muñoz, Iciar; Viguri, Javier R.

    2016-01-01

    This paper shows the planning, the teaching activities and the evaluation of the learning and teaching process implemented in the Chemical Process Design course at the University of Cantabria, Spain. Educational methods to address the knowledge, skills and attitudes that students who complete the course are expected to acquire are proposed and…

  2. Designing and Implementing a Faculty Internet Workshop: A Collaborative Effort of Academic Computing Services and the University Library.

    ERIC Educational Resources Information Center

    Bradford, Jane T.; And Others

    1996-01-01

    Academic Computing Services staff and University librarians at Stetson University (DeLand, Florida) designed and implemented a three-day Internet workshop for interested faculty. The workshop included both hands-on lab sessions and discussions covering e-mail, telnet, ftp, Gopher, and World Wide Web. The planning, preparation of the lab and…

  3. Acquisition Handbook - Update. Comprehensive Approach to Reusable Defensive Software (CARDS)

    DTIC Science & Technology

    1994-03-25

    designs, and implementation components (source code, test plans, procedures and results, and system/software documentation). This handbook provides a...activities where software components are acquired, evaluated, tested and sometimes modified. In addition to serving as a facility for the acquisition and...systems from such components [1]. Implementation components are at the lowest level and consist of: specifications; detailed designs; code, test

  4. Field tests of a participatory ergonomics toolkit for Total Worker Health

    PubMed Central

    Kernan, Laura; Plaku-Alakbarova, Bora; Robertson, Michelle; Warren, Nicholas; Henning, Robert

    2018-01-01

    Growing interest in Total Worker Health® (TWH) programs to advance worker safety, health and well-being motivated development of a toolkit to guide their implementation. Iterative design of a program toolkit occurred in which participatory ergonomics (PE) served as the primary basis to plan integrated TWH interventions in four diverse organizations. The toolkit provided start-up guides for committee formation and training, and a structured PE process for generating integrated TWH interventions. Process data from program facilitators and participants throughout program implementation were used for iterative toolkit design. Program success depended on organizational commitment to regular design team meetings with a trained facilitator, the availability of subject matter experts on ergonomics and health to support the design process, and retraining whenever committee turnover occurred. A two committee structure (employee Design Team, management Steering Committee) provided advantages over a single, multilevel committee structure, and enhanced the planning, communication, and team-work skills of participants. PMID:28166897

  5. Paratransit Handbook : a Guide to Paratransit System Implementation volume II - parts 4 and 5

    DOT National Transportation Integrated Search

    1979-02-01

    This Paratransit Handbook has been developed to aid public officials, planners and system operators in planning, designing, implementing, operating and evaluating integrated paratransit systems. The Handbook represents a compedium of techniques and e...

  6. Evaluation of complete streets policy implementation by metropolitan planning organizations.

    DOT National Transportation Integrated Search

    2015-09-01

    Over the last ten years, communities around the country have begun to implement comprehensive reforms : designed to ensure that roadway users of all ages and abilities can safely utilize the transportation system. : This complete streets policy frame...

  7. Analysis of strategic plans to assess planning for sustainability of comprehensive community initiatives.

    PubMed

    Sridharan, Sanjeev; Go, Sodam; Zinzow, Heidi; Gray, Aracelis; Barrett, Melissa Gutierrez

    2007-02-01

    In order to achieve the intended impact on a community, comprehensive community initiatives must sustain programs once they have been implemented. However, planning for sustainability is challenging and is rarely incorporated in the planning process of an initiative. The current study examined 19 5-year plans developed during the planning phase of the Comprehensive Strategy for Serious, Violent and Chronic Juvenile Offenders. Quantitative and qualitative methods were employed to assess the extent to which the construct of sustainability was incorporated. The plan analysis was supplemented with results from other components of the complex evaluation design implemented as part of the process evaluation of Comprehensive Strategy. Results suggested that sustainability was not accounted for during the planning phase of this initiative. The implications of these findings, including the importance of planning for sustainability in order to achieve sustainability, are discussed.

  8. Block 2 Solid Rocket Motor (SRM) conceptual design study. Volume 1: Appendices

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The design studies task implements the primary objective of developing a Block II Solid Rocket Motor (SRM) design offering improved flight safety and reliability. The SRM literature was reviewed. The Preliminary Development and Validation Plan is presented.

  9. A traffic data plan for mechanistic-empirical pavement designs (2002 pavement design guide).

    DOT National Transportation Integrated Search

    2003-01-01

    The Virginia Department of Transportation (VDOT) is preparing to implement the mechanistic-empirical pavement design methodology being developed under the National Cooperative Research Program's Project 1-37A, commonly referred to as the 2002 Pavemen...

  10. Business continuity and disaster management within the public service in relation to a national development plan.

    PubMed

    Ferguson, Cliff

    2018-01-01

    Within South Africa, few public service departments understand the concepts of business continuity management (BCM) and what it takes to implement a well-constructed business continuity plan. Likewise, few of these entities understand the purpose of designing and maintaining resilient systems that are immune to incidents. This paper discusses the integration of the South African Disaster Management Act 2002, the Disaster Management Framework and the National Development Plan, linking these to BCM, through a resilience period model, as a means for the implementation of resilience strategies. The goals of the National Development Plan are outlined with a view to how resilience can be achieved in each. A resilience period model has been advocated for the implementation of projects within the public sector in order to provide continuity and sustainability.

  11. 75 FR 3709 - Notice of Intent To Conduct Restoration Planning (Pursuant to 15 CFR 990.44)-Discharge of Oil...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... Administration (``NOAA''); the United States Department of the Interior (``DOl''), acting through the National... restoration planning, (2) Ephemeral data, and/or (3) Information needed to design or implement anticipated...

  12. 78 FR 25236 - Approval and Promulgation of Implementation Plans; New York; Infrastructure SIP for the 1997 8...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... enable the Commissioner to designate air pollution episodes which trigger the action plans. Pursuant to..., posts warnings on the above-referenced Web site and issues press releases to local media outlets if...

  13. Clinical implementation of 3D printing in the construction of patient specific bolus for electron beam radiotherapy for non-melanoma skin cancer.

    PubMed

    Canters, Richard A; Lips, Irene M; Wendling, Markus; Kusters, Martijn; van Zeeland, Marianne; Gerritsen, Rianne M; Poortmans, Philip; Verhoef, Cornelia G

    2016-10-01

    Creating an individualized tissue equivalent material build-up (i.e. bolus) for electron beam radiation therapy is complex and highly labour-intensive. We implemented a new clinical workflow in which 3D printing technology is used to create the bolus. A patient-specific bolus is designed in the treatment planning system (TPS) and a shell around it is created in the TPS. The shell is printed and subsequently filled with silicone rubber to make the bolus. Before clinical implementation we performed a planning study with 11 patients to evaluate the difference in tumour coverage between the designed 3D-print bolus and the clinically delivered plan with manually created bolus. For the first 15 clinical patients a second CT scan with the 3D-print bolus was performed to verify the geometrical accuracy. The planning study showed that the V85% of the CTV was on average 97% (3D-print) vs 88% (conventional). Geometric comparison of the 3D-print bolus to the originally contoured bolus showed a high similarity (DSC=0.89). The dose distributions on the second CT scan with the 3D print bolus in position showed only small differences in comparison to the original planning CT scan. The implemented workflow is feasible, patient friendly, safe, and results in high quality dose distributions. This new technique increases time efficiency. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  14. 78 FR 44494 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ...EPA is proposing to approve, as a revision of the California state implementation plan, the State's request to redesignate the Sacramento nonattainment area to attainment for the 24-hour particulate matter of ten microns or less (PM10) National Ambient Air Quality Standard (NAAQS). EPA is also proposing to approve the PM10 maintenance plan and the associated motor vehicle emissions budgets for use in transportation conformity determinations necessary for the Sacramento area. Finally, EPA is proposing to approve the attainment year emissions inventory. EPA is proposing these actions because the SIP revision meets the requirements of the Clean Air Act and EPA guidance for such plans and motor vehicle emissions budgets.

  15. Le Nouveau Manuel de Formation sur l'Elaboration et la Gestion des Projets. (The New Project Design and Management Workshop Training Manual).

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Information Collection and Exchange Div.

    A french language version of a training manual that presents guidelines for planning and conducting a project design and management (PDM) workshop to teach Peace Corps volunteers to involve local community members in the process of using participatory analysis tools and planning and implementing projects meeting local desires and needs. The first…

  16. A multi-institutional dosimetry audit of rotational intensity-modulated radiotherapy.

    PubMed

    Clark, Catharine H; Hussein, Mohammad; Tsang, Yatman; Thomas, Russell; Wilkinson, Dean; Bass, Graham; Snaith, Julia; Gouldstone, Clare; Bolton, Steve; Nutbrown, Rebecca; Venables, Karen; Nisbet, Andrew

    2014-11-01

    Rotational IMRT (VMAT and Tomotherapy) has now been implemented in many radiotherapy centres. An audit to verify treatment planning system modelling and treatment delivery has been undertaken to ensure accurate clinical implementation. 34 institutions with 43 treatment delivery systems took part in the audit. A virtual phantom planning exercise (3DTPS test) and a clinical trial planning exercise were planned and independently measured in each institution using a phantom and array combination. Point dose differences and global gamma index (γ) were calculated in regions corresponding to PTVs and OARs. Point dose differences gave a mean (±sd) of 0.1±2.6% and 0.2±2.0% for the 3DTPS test and clinical trial plans, respectively. 34/43 planning and delivery combinations achieved all measured planes with >95% pixels passing γ<1 at 3%/3mm and rose to 42/43 for clinical trial plans. A statistically significant difference in γ pass rates (p<0.01) was seen between planning systems where rotational IMRT modelling had been designed for the manufacturer's own treatment delivery system and those designed independently of rotational IMRT delivery. A dosimetry audit of rotational radiotherapy has shown that TPS modelling and delivery for rotational IMRT can achieve high accuracy of plan delivery. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  17. Gaining Insight into an Organization's Fixed Assets.

    ERIC Educational Resources Information Center

    Hardy, Elisabet

    2003-01-01

    Discusses issues related to school district implementation of June 2001 Government Accounting Standards Board (GASB) Statement 34 designed to change how schools report fixed assets. Includes planning for GASB implementation, conducting fixed-asset inventories, and making time for GASB reporting. (PKP)

  18. The Path to Successful ERP Implementation.

    ERIC Educational Resources Information Center

    Swartz, David G.

    2001-01-01

    Examines how universities and colleges can economically and efficiently implement an enterprise resource planning project when designing their administrative information system. Administrative steps discussed include conducting a needs assessment, deciding on the right system that matches the assessment, developing the correct contracting…

  19. 33 CFR 385.26 - Project Implementation Reports.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Report is a document that provides information on plan formulation and evaluation, engineering and..., environmental and/or economic benefits, engineering and design, costs, environmental impacts, real estate..., optimization and justification, cost-effectiveness, and engineering feasibility of the project; (xiii) Include...

  20. 40 CFR 256.65 - Recommendations for public participation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... participation. 256.65 Section 256.65 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Public... designed to encourage informed public participation in the development and implementation of solid waste...

  1. Guidelines for the design and evaluation of human factors aspects of automated guideway transit systems

    DOT National Transportation Integrated Search

    1979-03-01

    This report is a summary of human factors considerations for the planning, : deSign, construction, and implementation of Automated Guideway Transit (AGT) Systems : including Downtown People Mover (DPM) systems. Design concepts such as passenger : saf...

  2. 75 FR 391 - Statement of Organization, Functions and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... cards; (4) provides planning, management and oversight of all interior design projects, move services... in all equal employment opportunity (EEO) areas; (2) administers affirmative action programs designed... problems in terms of financial management information; (6) analyzes the design, implementation, enhancement...

  3. Bioresearch module design definition and space shuttle vehicle integration. Volume 3: Management and funding plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A description is given of the proposed project organization, documentation and reports, project planning, direction and control, related experience and facilities, and cost estimate data and options for the implementation of the bioresearch module development program.

  4. International Space Station Payload Operations Integration Center (POIC) Overview

    NASA Technical Reports Server (NTRS)

    Ijames, Gayleen N.

    2012-01-01

    Objectives and Goals: Maintain and operate the POIC and support integrated Space Station command and control functions. Provide software and hardware systems to support ISS payloads and Shuttle for the POIF cadre, Payload Developers and International Partners. Provide design, development, independent verification &validation, configuration, operational product/system deliveries and maintenance of those systems for telemetry, commanding, database and planning. Provide Backup Control Center for MCC-H in case of shutdown. Provide certified personnel and systems to support 24x7 facility operations per ISS Program. Payloads CoFR Implementation Plan (SSP 52054) and MSFC Payload Operations CoFR Implementation Plan (POIF-1006).

  5. Space Station Furnace Facility Preliminary Project Implementation Plan (PIP). Volume 2, Appendix 2

    NASA Technical Reports Server (NTRS)

    Perkey, John K.

    1992-01-01

    The Space Station Furnace Facility (SSFF) is an advanced facility for materials research in the microgravity environment of the Space Station Freedom and will consist of Core equipment and various sets of Furnace Module (FM) equipment in a three-rack configuration. This Project Implementation Plan (PIP) document was developed to satisfy the requirements of Data Requirement Number 4 for the SSFF study (Phase B). This PIP shall address the planning of the activities required to perform the detailed design and development of the SSFF for the Phase C/D portion of this contract.

  6. Introducing a New Learning and Teaching Evaluation Planning Framework for Small Internally Funded Projects in Higher Education

    ERIC Educational Resources Information Center

    Huber, Elaine

    2017-01-01

    Scholarly evaluation practices in learning and teaching projects are under-reported in the literature. In order for robust evaluative measures to be implemented, a project requires a well-designed evaluation plan. This research study describes the development of a practical evaluation planning framework through an action research approach, using…

  7. Homemaker-Home Health Aide Program. A Challenge to Vocational Education. A Modified Competency Based Pilot Training Program.

    ERIC Educational Resources Information Center

    Holton, Hazel S.

    This curriculum guide is designed to be used by vocational educators in planning, developing, coordinating, and implementing homemaker-health aide programs. It is divided into three parts. Covered first are various aspects of program planning, including planning and organization, the role of the adult educator and the adult learner, and…

  8. The Assessment of Public Issue Perception: Exploration of a Three-Tiered, Social-Network Based Methodology in the Champlain Basin.

    ERIC Educational Resources Information Center

    Gore, Peter H.; And Others

    Design, application, and interpretation of a three-tiered sampling framework as a strategy for eliciting public participation in planning and program implementation is presented, with emphasis on implications for federal programs which mandate citizen participation (for example, Level B planning of Water Resources Planning Act, Federal Water…

  9. Conceptualizing and Describing Teachers' Learning of Pedagogical Concepts

    ERIC Educational Resources Information Center

    González, María José; Gómez, Pedro

    2014-01-01

    In this paper, we propose a model to explore how teachers learn pedagogical concepts in teacher education programs that expect them to become competent in lesson planning. In this context, we view pedagogical concepts as conceptual and methodological tools that help teachers to design a lesson plan on a topic, implement this lesson plan and assess…

  10. Designing automatic resupply systems.

    PubMed

    Harding, M L

    1999-02-01

    This article outlines the process for designing and implementing autoresupply systems. The planning process includes determination of goals and appropriate participation. Different types of autoresupply mechanisms include kanban, breadman, consignment, systems contracts, and direct shipping from an MRP schedule.

  11. Design and Implementation of Total Quality Management in a Civil Engineering Squadron

    DTIC Science & Technology

    1989-09-01

    instruct employees and seek new ways to integrate quality into all functions, such as planning, marketing , and controlling. The second strategy is for...implement a TQM plan that contributes to the overall DOD TQM process. 7 2. Managers at all levels will provide leadership and integrate TQM principles... integral part of our daily activities. 8 3. Quality improvement is the key to productivity improvement and must be pursued with the necessary resources to

  12. How to improve medical education website design.

    PubMed

    Sisson, Stephen D; Hill-Briggs, Felicia; Levine, David

    2010-04-21

    The Internet provides a means of disseminating medical education curricula, allowing institutions to share educational resources. Much of what is published online is poorly planned, does not meet learners' needs, or is out of date. Applying principles of curriculum development, adult learning theory and educational website design may result in improved online educational resources. Key steps in developing and implementing an education website include: 1) Follow established principles of curriculum development; 2) Perform a needs assessment and repeat the needs assessment regularly after curriculum implementation; 3) Include in the needs assessment targeted learners, educators, institutions, and society; 4) Use principles of adult learning and behavioral theory when developing content and website function; 5) Design the website and curriculum to demonstrate educational effectiveness at an individual and programmatic level; 6) Include a mechanism for sustaining website operations and updating content over a long period of time. Interactive, online education programs are effective for medical training, but require planning, implementation, and maintenance that follow established principles of curriculum development, adult learning, and behavioral theory.

  13. A Human-Centered Command and Control (C2) Assessment of an Experimental Campaign Planning Tool

    DTIC Science & Technology

    2014-04-01

    and control (team without the CPT) groups . The two groups were designed to have an equal number of members; however, one member of the experimental...the researchers to analyze the planning process and outcomes. 3.3 Design and Procedure An experimental versus control group design was implemented...the post -PFnet (figure 16b). Within the PFnets, a concept can be focused on in order to identify how the individual or group is defining or

  14. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    NASA Astrophysics Data System (ADS)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  15. 75 FR 7608 - Statement of Organization, Functions and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... cards; (4) provides planning, management and oversight of all interior design projects, move services... program-level HRSA components in the design and conduct of evaluations; (5) develops annual performance... training program, and the mentoring program; (2) develops, designs, and implements a comprehensive...

  16. Advanced Free Flight Planner and Dispatcher's Workstation: Preliminary Design Specification

    NASA Technical Reports Server (NTRS)

    Wilson, J.; Wright, C.; Couluris, G. J.

    1997-01-01

    The National Aeronautics and Space Administration (NASA) has implemented the Advanced Air Transportation Technology (AATT) program to investigate future improvements to the national and international air traffic management systems. This research, as part of the AATT program, developed preliminary design requirements for an advanced Airline Operations Control (AOC) dispatcher's workstation, with emphasis on flight planning. This design will support the implementation of an experimental workstation in NASA laboratories that would emulate AOC dispatch operations. The work developed an airline flight plan data base and specified requirements for: a computer tool for generation and evaluation of free flight, user preferred trajectories (UPT); the kernel of an advanced flight planning system to be incorporated into the UPT-generation tool; and an AOC workstation to house the UPT-generation tool and to provide a real-time testing environment. A prototype for the advanced flight plan optimization kernel was developed and demonstrated. The flight planner uses dynamic programming to search a four-dimensional wind and temperature grid to identify the optimal route, altitude and speed for successive segments of a flight. An iterative process is employed in which a series of trajectories are successively refined until the LTPT is identified. The flight planner is designed to function in the current operational environment as well as in free flight. The free flight environment would enable greater flexibility in UPT selection based on alleviation of current procedural constraints. The prototype also takes advantage of advanced computer processing capabilities to implement more powerful optimization routines than would be possible with older computer systems.

  17. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    PubMed Central

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations. PMID:27606968

  18. 76 FR 15219 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-21

    ... of the San Joaquin Valley Air Basin and East Kern areas for particulate matter of ten microns or less... for particulate matter of ten microns or less (PM-10) by splitting the area into two separate...

  19. The Business Education Curriculum.

    ERIC Educational Resources Information Center

    Selden, William H., Jr.

    The publication is designed to serve as a guide for those responsible for business education in Pennsylvania, emphasizing curriculum planning and the development of course guidelines. Chapter one deals with planning the business education program within the framework of the principles of curriculum construction. Program implementation at the…

  20. Doing Better with Less Energy: Energy Master Planning.

    ERIC Educational Resources Information Center

    Sieben, Stephen P.

    1982-01-01

    Energy savings through improved operation and maintenance of buildings and through implementation of energy conservation measures are discussed. Energy master planning--an approach to major retrofit and occupancy for existing college buildings, and energy conscious design and occupancy for new buildings--is advocated. (MLW)

  1. Employee Motivation for Personal Development Plan Effectiveness

    ERIC Educational Resources Information Center

    Eisele, Lisa; Grohnert, Therese; Beausaert, Simon; Segers, Mien

    2013-01-01

    Purpose: This article aims to understand conditions under which personal development plans (PDPs) can effectively be implemented for professional learning. Both the organization's manner of supporting the PDP practice as well as the individual employee's motivation is taken into account. Design/ methodology/approach: A questionnaire was…

  2. 77 FR 38801 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Resource Management (VRM) Plan, Amendment, Class Designation, Carbon County, WY, Review Period Ends: 07/30... Final Vehicle Management Plan, Implementation, Denali National Park and Preserve, AK, Review Period Ends.... EIS No. 20120199, Final EIS, RUS, MS, ADOPTION--Kemper County Integrated Gasification Combined Cycle...

  3. Improving flood risk management through risk communication strategies

    NASA Astrophysics Data System (ADS)

    Bodoque, Jose Maria; Diez Herrero, Andres; Amerigo, Maria; Garcia, Juan Antonio; Olcina, Jorge; Cortes, Beatriz

    2016-04-01

    A suitable level of social perception about flood risk and awareness of Civil Protection Plans are critical to minimize disasters and damages due to flash floods. In order to improve risk perception, awareness and, as a result, the effectiveness of Civil Protection Plans, it is often required the implementation of communication plans. This research proposes a guide recommendation framework to enhance local population preparedness, prevention and response when a flash flood occurs. The research setting was a village (Navaluenga) located in Central Spain with 2,027 inhabitants. It is crossed by the Alberche river and Chorreron stream (both tributaries of the Tagus river), which are prone to flash floods. In a first phase, we assessed citizens' flash-flood risk perception and level of awareness regarding some key variables of the Civil Protection Plan. To this end, a questionnaire survey was designed and 254 adults, a sample representing roughly 12% of the population census, were interviewed. Responses were analysed, comparing awareness regarding preparedness and response actions with those previously defined in the Civil Protection Plan. In addition, we carried out a latent class cluster analysis aimed at identifying the different groups present among the respondents. Next, a risk communication plan was designed and implemented. It aimed to improve the understanding of flood risk among local people; and it comprises briefings, quiz-answers, contests of stories and flood images and intergenerational workshops. Finally, participants in the first phase were reached again and a new survey was performed. The results derived from these second questionnaires were statistically treated using the same approach of the first phase. Additionally, a t-test for paired samples and Pearson Chi-Square test was implemented in order to detect possible improvements in the perception and awareness. Preliminary results indicate that in Navaluenga there is a low social perception of flood risk and a low level of awareness regarding the Civil Protection Plan. In the social context of the Iberian Peninsula, where climate change models indicate an increase in extreme weather events and, consequently, high exposure and vulnerability to flash floods, the implementation of appropriately designed communication strategies is critical to improve the resilience of urban areas in order to cope with this risk.

  4. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  5. Characteristics and Determinants of Teacher-Designed Pay for Performance Plans: Evidence from Texas' Governor's Educator Excellence Grant (GEEG) Program. Working Paper 2008-26

    ERIC Educational Resources Information Center

    Taylor, Lori L.; Springer, Matthew G.; Ehlert, Mark

    2008-01-01

    This study describes the teacher pay for performance plans designed and implemented by the public schools participating in the Governor's Educator Excellence Grant (GEEG) program in Texas. GEEG is a federally funded, incentive pay program that awarded non-competitive grants, ranging from $60,000 to $220,000 each year for three years, to 99 Texas…

  6. Roads to Success: Estimated Impacts of an Education and Career Planning Program during Middle School. Final Report

    ERIC Educational Resources Information Center

    Chaplin, Duncan; Bleeker, Martha; Booker, Kevin

    2010-01-01

    Roads to Success (RTS) is a school and career planning program designed to be implemented for 45 minutes per week in grades 7 through 12. Researchers at Mathematica Policy Research used a random assignment design to estimate the impacts of receiving RTS in grades 7 and 8. More than half of the students in these schools were eligible for free or…

  7. Standardization of Course Plan and Design of Objective Structured Field Examination (OSFE) for the Assessment of Pharm.D. Student’s Community Pharmacy Clerkship Skills

    PubMed Central

    Monajjemzadeh, Farnaz; Shokri, Javad; Mohajel Nayebi, Ali Reza; Nemati, Mahboob; Azarmi, Yadollah; Charkhpour, Mohammad; Najafi, Moslem

    2014-01-01

    Purpose: This study was aimed to design Objective Structured Field Examination (OSFE) and also standardize the course plan of community pharmacy clerkship at Pharmacy Faculty of Tabriz University of Medical Sciences (Iran). Methods: The study was composed of several stages including; evaluation of the old program, standardization and implementation of the new course plan, design and implementation of OSFE, and finally results evaluation. Results: Lack of a fair final assessment protocol and proper organized educating system in various fields of community pharmacy clerkship skills were assigned as the main weaknesses of the old program. Educational priorities were determined and student’s feedback was assessed to design the new curriculum consisting of sessions to fulfill a 60-hour training course. More than 70% of the students were satisfied and successfulness and efficiency of the new clerkship program was significantly greater than the old program (P<0.05). In addition, they believed that OSFE was a suitable testing method. Conclusion: The defined course plan was successfully improved different skills of the students and OSFE was concluded as a proper performance based assessment method. This is easily adoptable by pharmacy faculties to improve the educational outcomes of the clerkship course. PMID:24511477

  8. The Design and Implementation of an Alternative High School.

    ERIC Educational Resources Information Center

    Kritek, William J.

    The analysis of the planning for an implementation of an alternative high school in a large urban school system is the focus of this study. Interview data are used. This investigation draws on, and compliments, the previous literature on implementation. While most of the earlier studies look at failures, this one is based on an instance of…

  9. Effects of Coaching on Teachers' Implementation of Tier 1 School-Wide Positive Behavioral Interventions and Support Strategies

    ERIC Educational Resources Information Center

    Bethune, Keri S.

    2017-01-01

    Fidelity of implementation of School-Wide Positive Behavioral Interventions and Supports (SWPBIS) procedures within schools is critical to the success of the program. Coaching has been suggested as one approach to helping ensure accuracy of implementation of SWPBIS plans. This study used a multiple baseline across participants design to examine…

  10. Project USHER (Uniting Science and Humanness for Educational Redesign): A Proposal for Implementing a Humanistic Management System in Community Colleges.

    ERIC Educational Resources Information Center

    League for Innovation in the Community Coll., Los Angeles, CA.

    Project USHER is designed to help community colleges implement a humanistic management system. This objective is to be achieved by giving each participating college the capability to redesign its own educational system through implementing a planning, programming, budgeting, and evaluation system (PPBE) within the context of participative…

  11. Design and implementation of a biomimetic turtle hydrofoil for an autonomous underwater vehicle.

    PubMed

    Font, Davinia; Tresanchez, Marcel; Siegentahler, Cedric; Pallejà, Tomàs; Teixidó, Mercè; Pradalier, Cedric; Palacin, Jordi

    2011-01-01

    This paper presents the design and implementation of a turtle hydrofoil for an Autonomous Underwater Vehicle (AUV). The final design of the AUV must have navigation performance like a turtle, which has also been the biomimetic inspiration for the design of the hydrofoil and propulsion system. The hydrofoil design is based on a National Advisory Committee for Aeronautics (NACA) 0014 hydrodynamic profile. During the design stage, four different propulsion systems were compared in terms of propulsion path, compactness, sealing and required power. The final implementation is based on a ball-and-socket mechanism because it is very compact and provides three degrees of freedom (DoF) to the hydrofoil with very few restrictions on the propulsion path. The propulsion obtained with the final implementation of the hydrofoil has been empirically evaluated in a water channel comparing different motion strategies. The results obtained have confirmed that the proposed turtle hydrofoil controlled with a mechanism with three DoF generates can be used in the future implementation of the planned AUV.

  12. Does Implementation Follow Design? A Case Study of a Workplace Health Promotion Program Using the 4-S Program Design and the PIPE Impact Metric Evaluation Models.

    PubMed

    Äikäs, Antti Hermanni; Pronk, Nicolaas P; Hirvensalo, Mirja Hannele; Absetz, Pilvikki

    2017-08-01

    The aim of this study was to describe the content of a multiyear market-based workplace health promotion (WHP) program and to evaluate design and implementation processes in a real-world setting. Data was collected from the databases of the employer and the service provider. It was classified using the 4-S (Size, Scope, Scalability, and Sustainability) and PIPE Impact Metric (Penetration, Implementation) models. Data analysis utilized both qualitative and quantitative methods. Program design covered well the evidence-informed best practices except for clear path toward sustainability, cooperation with occupational health care, and support from middle-management supervisors. The penetration rate among participants was high (99%) and majority (81%) of services were implemented as designed. Study findings indicate that WHP market would benefit the use of evidence-based design principles and tendentious decisions to anticipate a long-term implementation process already during the planning phase.

  13. Does Implementation Follow Design? A Case Study of a Workplace Health Promotion Program Using the 4-S Program Design and the PIPE Impact Metric Evaluation Models

    PubMed Central

    Äikäs, Antti Hermanni; Pronk, Nicolaas P.; Hirvensalo, Mirja Hannele; Absetz, Pilvikki

    2017-01-01

    Objective: The aim of this study was to describe the content of a multiyear market-based workplace health promotion (WHP) program and to evaluate design and implementation processes in a real-world setting. Methods: Data was collected from the databases of the employer and the service provider. It was classified using the 4-S (Size, Scope, Scalability, and Sustainability) and PIPE Impact Metric (Penetration, Implementation) models. Data analysis utilized both qualitative and quantitative methods. Results: Program design covered well the evidence-informed best practices except for clear path toward sustainability, cooperation with occupational health care, and support from middle-management supervisors. The penetration rate among participants was high (99%) and majority (81%) of services were implemented as designed. Conclusion: Study findings indicate that WHP market would benefit the use of evidence-based design principles and tendentious decisions to anticipate a long-term implementation process already during the planning phase. PMID:28665839

  14. Assessing the shelf life of cost-efficient conservation plans for species at risk across gradients of agricultural land use.

    PubMed

    Robillard, Cassandra M; Kerr, Jeremy T

    2017-08-01

    High costs of land in agricultural regions warrant spatial prioritization approaches to conservation that explicitly consider land prices to produce protected-area networks that accomplish targets efficiently. However, land-use changes in such regions and delays between plan design and implementation may render optimized plans obsolete before implementation occurs. To measure the shelf life of cost-efficient conservation plans, we simulated a land-acquisition and restoration initiative aimed at conserving species at risk in Canada's farmlands. We accounted for observed changes in land-acquisition costs and in agricultural intensity based on censuses of agriculture taken from 1986 to 2011. For each year of data, we mapped costs and areas of conservation priority designated using Marxan. We compared plans to test for changes through time in the arrangement of high-priority sites and in the total cost of each plan. For acquisition costs, we measured the savings from accounting for prices during site selection. Land-acquisition costs and land-use intensity generally rose over time independent of inflation (24-78%), although rates of change were heterogeneous through space and decreased in some areas. Accounting for spatial variation in land price lowered the cost of conservation plans by 1.73-13.9%, decreased the range of costs by 19-82%, and created unique solutions from which to choose. Despite the rise in plan costs over time, the high conservation priority of particular areas remained consistent. Delaying conservation in these critical areas may compromise what optimized conservation plans can achieve. In the case of Canadian farmland, rapid conservation action is cost-effective, even with moderate levels of uncertainty in how to implement restoration goals. © 2016 Society for Conservation Biology.

  15. A user interface for a knowledge-based planning and scheduling system

    NASA Technical Reports Server (NTRS)

    Mulvehill, Alice M.

    1988-01-01

    The objective of EMPRESS (Expert Mission Planning and Replanning Scheduling System) is to support the planning and scheduling required to prepare science and application payloads for flight aboard the US Space Shuttle. EMPRESS was designed and implemented in Zetalisp on a 3600 series Symbolics Lisp machine. Initially, EMPRESS was built as a concept demonstration system. The system has since been modified and expanded to ensure that the data have integrity. Issues underlying the design and development of the EMPRESS-I interface, results from a system usability assessment, and consequent modifications are described.

  16. Current science requirements and planned implementation for the WFIRST-CGI Integral Field Spectrograph (IFS)

    NASA Astrophysics Data System (ADS)

    Mandell, Avi M.; Groff, Tyler D.; Gong, Qian; Rizzo, Maxime J.; Lupu, Roxana; Zimmerman, Neil T.; Saxena, Prabal; McElwain, Michael W.

    2017-09-01

    One of the key science goals of the Coronograph Instrument (CGI) on the WFIRST mission is to spectrally characterize the atmospheres of planets around other stars at extremely high contrast levels. To achieve this goal, the CGI instrument will include a integral field spectrograph (IFS) as one of the two science cameras. We present the current science requirements that pertain to the IFS design, describe how our design implementation flows from these requirements, and outline our current instrument design.

  17. Current Science Requirements and Planned Implementation for the WFIRST-CGI Integral Field Spectrograph (IFS)

    NASA Technical Reports Server (NTRS)

    Mandell, Avi M.; Groff, Tyler D.; Gong, Qian; Rizzo, Maxime J.; Lupu, Roxana; Zimmerman, Neil T.; Saxena, Prabal; McElwain, Michael W.

    2017-01-01

    One of the key science goals of the Coronograph Instrument (CGI) on the WFIRST mission is to spectrally characterize the atmospheres of planets around other stars at extremely high contrast levels. To achieve this goal, the CGI Instrument will include a integral field spectrograph (IFS) as one of the two science cameras. We present the current science requirements that pertain to the IFS design, describe how our design implementation flows from these requirements, and outline our current instrument design.

  18. Barriers to the implementation of self management support in long term lung conditions

    PubMed Central

    Roberts, NJ; Younis, I; Kidd, L

    2012-01-01

    Background Self-management improves outcomes in asthma and COPD and is strongly recommended in national and international guidelines; however implementation of the guidelines such as use of written action plans in practice is often poor. Setting A questionnaire survey was undertaken to identify the healthcare professional barriers to implementation of self-management for asthma and COPD in West London. Question Why is self-management education not being undertaken in respiratory conditions? Methods A questionnaire was designed to elicit healthcare professionals' views about barriers to implementation of self-management in asthma and COPD. Results Response rates were 33% (58/175). Results showed strong support for guideline recommendations, however implementation was patchy. Seventy six percent of respondents discussed asthma self-management with patients; however only 47.8% of patients received a written action plan. For COPD patients, 55.1% discussed self-management, with 41% receiving a written action plan. In COPD, there was greater GP involvement and less delegation of self-management. Barriers to implementation included patient factors (compliance, literacy and patient understanding), time constraints and insufficient resources. Those who believed they had witnessed improved health outcomes with self-management (53%, 31/58) were more likely to give written action plans (78%, 24/31, ‘nearly always/sometimes’ gave written action plans), Nearly a third of healthcare professionals reported lacking confidence in constructing written action plans (33% 19/58; GPs 43%, nurses 43%). Conclusion Despite overwhelming evidence self-management support is still not being implemented into routine clinical practice, identified barriers included time constraints, lack of training, lack of belief in patients ability to self-manage and lack of confidence completing self-management plans. Practice implications These issues need to be addressed if self-management support is to be delivered in a meaningful and effective way. PMID:25949665

  19. Evaluation of interventions on road traffic injuries in Peru: a qualitative approach

    PubMed Central

    2012-01-01

    Background Evaluation of interventions on road traffic injuries (RTI) going beyond the assessment of impact to include factors underlying success or failure is an important complement to standard impact evaluations. We report here how we used a qualitative approach to assess current interventions implemented to reduce RTIs in Peru. Methods We performed in-depth interviews with policymakers and technical officers involved in the implementation of RTI interventions to get their insight on design, implementation and evaluation aspects. We then conducted a workshop with key stakeholders to analyze the results of in-depth interviews, and to further discuss and identify key programmatic considerations when designing and implementing RTI interventions. We finally performed brainstorming sessions to assess potential system-wide effects of a selected intervention (Zero Tolerance), and to identify adaptation and redesign needs for this intervention. Results Key programmatic components were consistently identified that should be considered when designing and implementing RTI interventions. They include effective and sustained political commitment and planning; sufficient and sustained budget allocation; training, supervision, monitoring and evaluation of implemented policies; multisectoral participation; and strong governance and accountability. Brainstorming sessions revealed major negative effects of the selected intervention on various system building blocks. Conclusions Our approach revealed substantial caveats in current RTI interventions in Peru, and fundamental negative effects on several components of the sectors and systems involved. It also highlighted programmatic issues that should be applied to guarantee an effective implementation and evaluation of these policies. The findings from this study were discussed with key stakeholders for consideration in further designing and planning RTI control interventions in Peru. PMID:22269578

  20. Evaluation of interventions on road traffic injuries in Peru: a qualitative approach.

    PubMed

    Huicho, Luis; Adam, Taghreed; Rosales, Edmundo; Paca-Palao, Ada; López, Luis; Luna, Diego; Miranda, J Jaime

    2012-01-23

    Evaluation of interventions on road traffic injuries (RTI) going beyond the assessment of impact to include factors underlying success or failure is an important complement to standard impact evaluations. We report here how we used a qualitative approach to assess current interventions implemented to reduce RTIs in Peru. We performed in-depth interviews with policymakers and technical officers involved in the implementation of RTI interventions to get their insight on design, implementation and evaluation aspects. We then conducted a workshop with key stakeholders to analyze the results of in-depth interviews, and to further discuss and identify key programmatic considerations when designing and implementing RTI interventions. We finally performed brainstorming sessions to assess potential system-wide effects of a selected intervention (Zero Tolerance), and to identify adaptation and redesign needs for this intervention. Key programmatic components were consistently identified that should be considered when designing and implementing RTI interventions. They include effective and sustained political commitment and planning; sufficient and sustained budget allocation; training, supervision, monitoring and evaluation of implemented policies; multisectoral participation; and strong governance and accountability. Brainstorming sessions revealed major negative effects of the selected intervention on various system building blocks. Our approach revealed substantial caveats in current RTI interventions in Peru, and fundamental negative effects on several components of the sectors and systems involved. It also highlighted programmatic issues that should be applied to guarantee an effective implementation and evaluation of these policies. The findings from this study were discussed with key stakeholders for consideration in further designing and planning RTI control interventions in Peru.

  1. Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.

    Treesearch

    Jonathan Thompson

    2007-01-01

    The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoring—the systematic observation and measurement of a set...

  2. 78 FR 59261 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... continue to attain the 24-hour PM 10 NAAQS for at least 10 years beyond redesignation (i.e., through 2023... maintenance demonstration showing how the area will continue to attain the 24-hour PM 10 NAAQS for 10 years... serves as the Sacramento PM 10 Maintenance Plan's attainment year emissions inventory, as satisfying the...

  3. 78 FR 38223 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ... demonstration showing how the area will continue to attain the 24-hour PM 10 NAAQS for at least 10 years beyond...; California; South Coast Air Basin; Approval of PM 10 Maintenance Plan and Redesignation to Attainment for the PM 10 Standard AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is...

  4. Long Range Facilities Planning and Design Implementation for Students with Disabilities: A Guide for New Jersey School Districts

    ERIC Educational Resources Information Center

    Lowenkron, Ruth; Ponessa, Joan

    2005-01-01

    The long range facilities planning (LRFP) process presents a wonderful opportunity for New Jersey's school districts to re-examine and strengthen their long term planning for educational adequacy in 21st century school facilities. It provides an opportunity for districts to work closely with the special education community to ensure that New…

  5. The Implementation of the Bologna Process

    ERIC Educational Resources Information Center

    Kettunen, Juha; Kantola, Mauri

    2006-01-01

    This study identifies the responsibilities of the bodies and institutions involved in the implementation of the Bologna Process. They include the levels of Europe, nations, higher education institutions, departments, degree programmes, teachers and students. The future planning is analysed using the Balanced Scorecard approach designed for the…

  6. 40 CFR 96.114 - Objections concerning CAIR designated representative.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Objections concerning CAIR designated... IMPLEMENTATION PLANS CAIR Designated Representative for CAIR NOX Sources § 96.114 Objections concerning CAIR... communication submitted to the permitting authority or the Administrator concerning the authorization, or any...

  7. 40 CFR 96.214 - Objections concerning CAIR designated representative.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Objections concerning CAIR designated... IMPLEMENTATION PLANS CAIR Designated Representative for CAIR SO2 Sources § 96.214 Objections concerning CAIR... communication submitted to the permitting authority or the Administrator concerning the authorization, or any...

  8. Changes in the Precision of a Study from Planning Phase to Implementation Phase: Evidence from the First Wave of Group Randomized Trials Launched by the Institute of Education Sciences

    ERIC Educational Resources Information Center

    Spybrook, Jessaca; Lininger, Monica; Cullen, Anne

    2011-01-01

    The purpose of this study is to extend the work of Spybrook and Raudenbush (2009) and examine how the research designs and sample sizes changed from the planning phase to the implementation phase in the first wave of studies funded by IES. The authors examine the impact of the changes in terms of the changes in the precision of the study from the…

  9. Research and applications: Artificial intelligence

    NASA Technical Reports Server (NTRS)

    Raphael, B.; Duda, R. O.; Fikes, R. E.; Hart, P. E.; Nilsson, N. J.; Thorndyke, P. W.; Wilber, B. M.

    1971-01-01

    Research in the field of artificial intelligence is discussed. The focus of recent work has been the design, implementation, and integration of a completely new system for the control of a robot that plans, learns, and carries out tasks autonomously in a real laboratory environment. The computer implementation of low-level and intermediate-level actions; routines for automated vision; and the planning, generalization, and execution mechanisms are reported. A scenario that demonstrates the approximate capabilities of the current version of the entire robot system is presented.

  10. The Strategic Design Inquiry: A Formal Methodology For Approaching, Designing, Integrating, And Articulating National Strategy

    DTIC Science & Technology

    2014-04-01

    15 Figure 4: Example cognitive map ... map , aligning planning efforts throughout the government. Even after strategy implementation, SDI calls for continuing, iterative learning and...the design before total commitment to it. Capturing this analysis on a cognitive map allows strategists to articulate a design to government

  11. 40 CFR 262.102 - What special definitions are included in this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS APPLICABLE TO GENERATORS OF HAZARDOUS WASTE University... particularly hazardous substances as designated in a University's Chemical Hygiene Plan under OSHA, or... Management Plan (EMP) means a written program developed and implemented by the university which sets forth...

  12. Planning for Competency-Based Teacher Education at the State Level.

    ERIC Educational Resources Information Center

    Roth, Robert A.

    There are eight areas which require attention in planning for state implementation of performance-based teacher education (PBTE): (a) initiation action, (b) goal statement formulation, (c) state role identification, (d) certification pattern design, (e) delivery system structure, (f) support mechanism organization, (g) regulation changes…

  13. Planning Requirements for Small School Facilities.

    ERIC Educational Resources Information Center

    Davis, J. Clark; McQueen, Robert

    The unique requirements of small school facilities, designed to handle multiple curricular functions within the same operational space, necessitate the creation of educational specifications tying the curriculum to that portion of the facility in which each curriculum component will be implemented. Thus, in planning the facility the major concern…

  14. Strategic Information Systems Planning in Malaysian Public Universities

    ERIC Educational Resources Information Center

    Ismail, Noor Azizi; Raja Mohd Ali, Raja Haslinda; Mat Saat, Rafeah; Hsbollah, Hafizah Mohamad

    2007-01-01

    Purpose: The paper's purpose is to investigate the current status, problems and benefits of strategic information systems planning implementation in Malaysian public universities. Design/methodology/approach: The study uses dual but mutually supportive strands of investigation, i.e. a questionnaire survey and interviews. Findings: Malaysian public…

  15. Design controls for large order systems

    NASA Technical Reports Server (NTRS)

    Doane, George B., III

    1991-01-01

    The output of this task will be a program plan which will delineate how MSFC will support and implement its portion of the Inter-Center Computational Controls Program Plan. Another output will be the results of looking at various multibody/multidegree of freedom computer programs in various environments.

  16. Reengineering the project design process

    NASA Astrophysics Data System (ADS)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  17. 40 CFR 96.212 - Changing CAIR designated representative and alternate CAIR designated representative; changes in...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR Designated Representative for CAIR SO2 Sources § 96.212 Changing CAIR designated representative and alternate... CAIR SO2 source and the CAIR SO2 units at the source. (b) Changing alternate CAIR designated...

  18. The Teachers' Views on the Significance of the Design and Craft Teaching in Finland

    ERIC Educational Resources Information Center

    Ronkko, Marja-Leena; Mommo, Sanna; Aerila, Juli-Anna

    2016-01-01

    The Finnish curriculum for crafts emphasises the creative problem-solving skills of the student, the completion of different design tasks and the implementation of designs, while seeking to nurture the student's self-esteem. Furthermore, students should draw up the designs for their artefacts, plan their work, and also develop designs when needed.…

  19. Acid Rain Classroom Projects.

    ERIC Educational Resources Information Center

    Demchik, Michael J.

    2000-01-01

    Describes a curriculum plan in which students learn about acid rain through instructional media, research and class presentations, lab activities, simulations, design, and design implementation. Describes the simulation activity in detail and includes materials, procedures, instructions, examples, results, and discussion sections. (SAH)

  20. Additional cash incentive within a conditional cash transfer scheme: a 'controlled before and during' design evaluation study from India.

    PubMed

    Lahariya, Chandrakant; Mishra, Ashok; Nandan, Deoki; Gautam, Praveen; Gupta, Sanjay

    2011-01-01

    Conditional Cash Transfer (CCT) schemes have shown largely favorable changes in the health seeking behavior. This evaluation study assesses the process and performance of an Additional Cash Incentive (ACI) scheme within an ongoing CCT scheme in India, and document lessons. A controlled before and during design study was conducted in Madhya Pradesh state of India, from August 2007 to March 2008, with increased in institutional deliveries as a primary outcome. In depth interviews, focus group discussions and household surveys were done for data collection. Lack of awareness about ACI scheme amongst general population and beneficiaries, cumbersome cash disbursement procedure, intricate eligibility criteria, extensive paper work, and insufficient focus on community involvement were the major implementation challenges. There were anecdotal reports of political interference and possible scope for corruption. At the end of implementation period, overall rate of institutional deliveries had increased in both target and control populations; however, the differences were not statistically significant. No cause and effect association could be proven by this study. Poor planning and coordination, and lack of public awareness about the scheme resulted in low utilization. Thus, proper IEC and training, detailed implementation plan, orientation training for implementer, sufficient budgetary allocation, and community participation should be an integral part for successful implementation of any such scheme. The lesson learned this evaluation study may be useful in any developing country setting and may be utilized for planning and implementation of any ACI scheme in future.

  1. Fluor Daniel Hanford implementation plan for DOE Order 5480.28, Natural phenomena hazards mitigation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conrads, T.J.

    1997-09-12

    Natural phenomena hazards (NPH) are unexpected acts of nature that pose a threat or danger to workers, the public, or the environment. Earthquakes, extreme winds (hurricane and tornado), snow, flooding, volcanic ashfall, and lightning strikes are examples of NPH that could occur at the Hanford Site. U.S. Department of Energy (DOE) policy requires facilities to be designed, constructed, and operated in a manner that protects workers, the public, and the environment from hazards caused by natural phenomena. DOE Order 5480.28, Natural Phenomena Hazards Mitigation, includes rigorous new natural phenomena criteria for the design of new DOE facilities, as well asmore » for the evaluation and, if necessary, upgrade of existing DOE facilities. The Order was transmitted to Westinghouse Hanford Company in 1993 for compliance and is also identified in the Project Hanford Management Contract, Section J, Appendix C. Criteria and requirements of DOE Order 5480.28 are included in five standards, the last of which, DOE-STD-1023, was released in fiscal year 1996. Because the Order was released before all of its required standards were released, enforcement of the Order was waived pending release of the last standard and determination of an in-force date by DOE Richland Operations Office (DOE-RL). Agreement also was reached between the Management and Operations Contractor and DOE-RL that the Order would become enforceable for new structures, systems, and components (SSCS) 60 days following issue of a new order-based design criteria in HNF-PRO-97, Engineering Design and Evaluation. The order also requires that commitments addressing existing SSCs be included in an implementation plan that is to be issued 1 year following the release of the last standard. Subsequently, WHC-SP-1175, Westinghouse Hanford Company Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, Rev. 0, was issued in November 1996, and this document, HNF-SP-1175, Fluor Daniel Hanford Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, is Rev. 1 of that plan.« less

  2. Toward a research and action agenda on urban planning/design and health equity in cities in low and middle-income countries.

    PubMed

    Smit, Warren; Hancock, Trevor; Kumaresen, Jacob; Santos-Burgoa, Carlos; Sánchez-Kobashi Meneses, Raúl; Friel, Sharon

    2011-10-01

    The importance of reestablishing the link between urban planning and public health has been recognized in recent decades; this paper focuses on the relationship between urban planning/design and health equity, especially in cities in low and middle-income countries (LMICs). The physical urban environment can be shaped through various planning and design processes including urban planning, urban design, landscape architecture, infrastructure design, architecture, and transport planning. The resultant urban environment has important impacts on the health of the people who live and work there. Urban planning and design processes can also affect health equity through shaping the extent to which the physical urban environments of different parts of cities facilitate the availability of adequate housing and basic infrastructure, equitable access to the other benefits of urban life, a safe living environment, a healthy natural environment, food security and healthy nutrition, and an urban environment conducive to outdoor physical activity. A new research and action agenda for the urban environment and health equity in LMICs should consist of four main components. We need to better understand intra-urban health inequities in LMICs; we need to better understand how changes in the built environment in LMICs affect health equity; we need to explore ways of successfully planning, designing, and implementing improved health/health equity; and we need to develop evidence-based recommendations for healthy urban planning/design in LMICs.

  3. Field tests of a participatory ergonomics toolkit for Total Worker Health.

    PubMed

    Nobrega, Suzanne; Kernan, Laura; Plaku-Alakbarova, Bora; Robertson, Michelle; Warren, Nicholas; Henning, Robert

    2017-04-01

    Growing interest in Total Worker Health ® (TWH) programs to advance worker safety, health and well-being motivated development of a toolkit to guide their implementation. Iterative design of a program toolkit occurred in which participatory ergonomics (PE) served as the primary basis to plan integrated TWH interventions in four diverse organizations. The toolkit provided start-up guides for committee formation and training, and a structured PE process for generating integrated TWH interventions. Process data from program facilitators and participants throughout program implementation were used for iterative toolkit design. Program success depended on organizational commitment to regular design team meetings with a trained facilitator, the availability of subject matter experts on ergonomics and health to support the design process, and retraining whenever committee turnover occurred. A two committee structure (employee Design Team, management Steering Committee) provided advantages over a single, multilevel committee structure, and enhanced the planning, communication, and teamwork skills of participants. Copyright © 2016 Elsevier Ltd. All rights reserved.

  4. Software verification plan for GCS. [guidance and control software

    NASA Technical Reports Server (NTRS)

    Dent, Leslie A.; Shagnea, Anita M.; Hayhurst, Kelly J.

    1990-01-01

    This verification plan is written as part of an experiment designed to study the fundamental characteristics of the software failure process. The experiment will be conducted using several implementations of software that were produced according to industry-standard guidelines, namely the Radio Technical Commission for Aeronautics RTCA/DO-178A guidelines, Software Consideration in Airborne Systems and Equipment Certification, for the development of flight software. This plan fulfills the DO-178A requirements for providing instructions on the testing of each implementation of software. The plan details the verification activities to be performed at each phase in the development process, contains a step by step description of the testing procedures, and discusses all of the tools used throughout the verification process.

  5. Design Studies. Guide to Standards and Implementation. Career & Technology Studies.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Curriculum Standards Branch.

    With this Career and Technology Studies (CTS) curriculum guide, secondary students in Alberta can do the following: develop skills that can be applied in their daily lives; refine career-planning skills; develop technology-related skills in design; enhance employability skills, especially in design occupations; and apply and reinforce learning…

  6. 49 CFR 236.913 - Filing and approval of PSPs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... architectural concepts; the PSP describes a product that uses design or safety assurance concepts considered... the end of the system design review phase of product development and 180 days prior to planned implementation, inviting FRA to participate in the design review process and receive periodic briefings and...

  7. 49 CFR 236.913 - Filing and approval of PSPs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... architectural concepts; the PSP describes a product that uses design or safety assurance concepts considered... the end of the system design review phase of product development and 180 days prior to planned implementation, inviting FRA to participate in the design review process and receive periodic briefings and...

  8. Designing a Web-Based Asynchronous Innovation/Entrepreneurism Course

    ERIC Educational Resources Information Center

    Ghandforoush, Parviz

    2017-01-01

    Teaching an online fully asynchronous information technology course that requires students to ideate, build an e-commerce website, and develop an effective business plan involves a well-developed and highly engaging course design. This paper describes the design, development, and implementation of such a course and presents information on…

  9. Implementing Universal Design Strategies in Municipalities - A Multidisciplinary Approach to Universal Design and Public Health.

    PubMed

    Jensen, Roger

    2016-01-01

    Based on a national program, the regional authorities stimulated each of the 18 municipalities in Telemark 2012-15 to plan and build promenades with universal design. The cooperation between different disciplines was an important factor for good results. The project continues from 2016.

  10. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    USGS Publications Warehouse

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  11. Internal quality control: planning and implementation strategies.

    PubMed

    Westgard, James O

    2003-11-01

    The first essential in setting up internal quality control (IQC) of a test procedure in the clinical laboratory is to select the proper IQC procedure to implement, i.e. choosing the statistical criteria or control rules, and the number of control measurements, according to the quality required for the test and the observed performance of the method. Then the right IQC procedure must be properly implemented. This review focuses on strategies for planning and implementing IQC procedures in order to improve the quality of the IQC. A quantitative planning process is described that can be implemented with graphical tools such as power function or critical-error graphs and charts of operating specifications. Finally, a total QC strategy is formulated to minimize cost and maximize quality. A general strategy for IQC implementation is recommended that employs a three-stage design in which the first stage provides high error detection, the second stage low false rejection and the third stage prescribes the length of the analytical run, making use of an algorithm involving the average of normal patients' data.

  12. Implementing successful strategic plans: a simple formula.

    PubMed

    Blondeau, Whitney; Blondeau, Benoit

    2015-01-01

    Strategic planning is a process. One way to think of strategic planning is to envision its development and design as a framework that will help your hospital navigate through internal and external changing environments over time. Although the process of strategic planning can feel daunting, following a simple formula involving five steps using the mnemonic B.E.G.I.N. (Begin, Evaluate, Goals & Objectives, Integration, and Next steps) will help the planning process feel more manageable, and lead you to greater success.

  13. 40 CFR 52.1960 - Original Identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., 1972. (Non-regulatory) (7) Sections 16.1, 16.3, and 16.5 of Regulation No. 16, “Control of Emissions of... plan revision designed to achieve the ozone standard in Tulsa County, including control strategy... Quality Control Implementation Plan” and all revisions submitted by Oklahoma that were federally approved...

  14. 40 CFR 52.1960 - Original Identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 1972. (Non-regulatory) (7) Sections 16.1, 16.3, and 16.5 of Regulation No. 16, “Control of Emissions of... plan revision designed to achieve the ozone standard in Tulsa County, including control strategy... Quality Control Implementation Plan” and all revisions submitted by Oklahoma that were federally approved...

  15. 40 CFR 52.1960 - Original Identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., 1972. (Non-regulatory) (7) Sections 16.1, 16.3, and 16.5 of Regulation No. 16, “Control of Emissions of... plan revision designed to achieve the ozone standard in Tulsa County, including control strategy... Quality Control Implementation Plan” and all revisions submitted by Oklahoma that were federally approved...

  16. 40 CFR 52.1960 - Original Identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., 1972. (Non-regulatory) (7) Sections 16.1, 16.3, and 16.5 of Regulation No. 16, “Control of Emissions of... plan revision designed to achieve the ozone standard in Tulsa County, including control strategy... Quality Control Implementation Plan” and all revisions submitted by Oklahoma that were federally approved...

  17. Using Theory to Guide Practice in Children's Pedestrian Safety Education

    ERIC Educational Resources Information Center

    Cross, Donna; Hall, Margaret; Howat, Peter

    2003-01-01

    Few pedestrian injury prevention programs appear to articulate the theory upon which their design and evaluation are based. This article describes how theory was used to plan, develop, implement, and evaluate the educational component of a comprehensive child pedestrian intervention. Organizational and planning theories were used to guide the…

  18. Rewiring a Working Library or Teaching an Old Dog New Tricks.

    ERIC Educational Resources Information Center

    White, Robert L.; Jaffe, Lee David

    1995-01-01

    This case study describes the planning, funding, and implementation of a complete data-wiring renovation at the University of California, Santa Cruz library. Highlights include design principles; project schedule; benefits for staff's electronic mail and network use and for upgraded public terminals; and the importance of planning and…

  19. Translating the Social-Ecological Perspective into Multilevel Interventions for Family Planning: How Far Are We?

    ERIC Educational Resources Information Center

    Schölmerich, Vera L. N.; Kawachi, Ichiro

    2016-01-01

    Scholars and practitioners frequently make recommendations to develop family planning interventions that are "multilevel." Such interventions take explicit account of the role of environments by incorporating multilevel or social-ecological frameworks into their design and implementation. However, research on how interventions have…

  20. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air...

  1. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...

  2. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...

  3. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... contingency plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents...

  4. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air...

  5. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air...

  6. Public Fire Education. First Edition. IFSTA 606.

    ERIC Educational Resources Information Center

    Laughlin, Jerry W., Ed.; And Others

    This manual was developed to give the firefighter basic knowledge concerning the problem of reaching the public with an educational program. Focusing on fire education planning, the first of seven chapters presents a five-step planning process that involves identification, selection, design, implementation, and evaluation. Chapter 2 presents a…

  7. Implementation of an Undergraduate Nutritional Support Clerkship.

    ERIC Educational Resources Information Center

    Stennett, Douglass J.; And Others

    1983-01-01

    A 10-week, full-time elective nutritional support clerkship designed for fifth-year pharmacy students is described. The course refines the student's communication skills and develops the student's ability to properly prepare and adjust a nutritional therapy plan. A weekly student activity plan and student evaluation form are appended. (MSE)

  8. Designing monitoring programs in an adaptive management context for regional multiple species conservation plans

    USGS Publications Warehouse

    Atkinson, A.J.; Trenham, P.C.; Fisher, R.N.; Hathaway, S.A.; Johnson, B.S.; Torres, S.G.; Moore, Y.C.

    2004-01-01

    critical management uncertainties; and 3) implementing long-term monitoring and adaptive management. Ultimately, the success of regional conservation planning depends on the ability of monitoring programs to confront the challenges of adaptively managing and monitoring complex ecosystems and diverse arrays of sensitive species.

  9. Community Involvement in Transportation Planning. Technical Report Series 37.

    ERIC Educational Resources Information Center

    Roden, David

    This paper is designed to assist city staffs and transportation agencies in organizing effective community involvement programs. The role of nontechnical information in the decision making process is addressed first, to help professional engineers and planners consider its importance in planning and implementation. In a chapter on value…

  10. Joint ETV/NOWATECH test plan for the Sorbisense GSW40 passive sampler

    EPA Science Inventory

    The joint test plan is the implementation of a test design developed for verification of the performance of an environmental technology following the NOWATECH ETV method. The verification is a joint verification with the US EPA ETV scheme and the Advanced Monitoring Systems Cent...

  11. Effective Professional Development Planning: The Wisconsin PDP

    ERIC Educational Resources Information Center

    Fischer, John A.

    2010-01-01

    Designed to improve PK-12 professional learning and increase student achievement, Wisconsin's policymakers developed and implemented new educator licensing guidelines (PI 34) and a Professional Development Plan (PDP) system based on empirical research and national policy trends in 2004. As PI 34 and the PDP system are relatively new, the…

  12. Developing and Monitoring Individual Education Plans for Handicapped Children.

    ERIC Educational Resources Information Center

    Armstrong, Mary Lee

    The practicum was designed to develop, implement, monitor, and evaluate a management system for developing and monitoring individual education plans (IEPs) for handicapped children as mandated by P.L. 94-142, the Education for All Handicapped Children Act. The products included an expectancy formula for educable mentally retarded (EMR) and…

  13. ["Good intentions are not enough": analysis of a health policy for the elderly in Senegal].

    PubMed

    Mbaye, Elhadji Mamadou; Ridde, Valery; Kâ, Ousseynou

    2013-01-01

    In 2006, the Senegalese government introduced the "Plan Sésame", an unprecedented policy in West Africa aimed at reducing social vulnerability among the elderly (i.e. people aged over 60 years). This paper examines the process of implementation of the "Plan Sdsame': Using a qualitative approach, the study was based on a unique case study authorized by the Senegalese Ministry of Health. Three methods were used: i) individual interviews (n = 19), ii) discussion groups (n = 24), and iii) documentary study. Despite its social objective, the "Plan Sésame" was ultimately limited to free health care. However, even the health component of the plan has suffered from under funding. Political obstacles, inadequate accompanying measures and short staffing have resulted in late reimbursements at a local level, thus limiting the implementation of the plan. While both health professionals and elderly people are in favor of free healthcare, they are also critical of the implementation issues surrounding the "Plan Sésame": Although it appears to be a viable solution, these issues may spell the end of the plan. The task of designing solid technical foundations and developing appropriate accompanying measures should not be overlooked because of the limited interest of international partners in the "Plan Sésame" the national dimension of the plan and its electoral importance.

  14. Decentralized Modular Systems Versus Centralized Systems.

    ERIC Educational Resources Information Center

    Crossey, R. E.

    Building design, planning, and construction programing for modular decentralized mechanical building systems are outlined in terms of costs, performance, expansion and flexibility. Design strategy, approach, and guidelines for implementing such systems for buildings are suggested, with emphasis on mechanical equipment and building element…

  15. Implementing Multisector Nutrition Programs in Ethiopia and Nepal: Challenges and Opportunities From a Stakeholder Perspective.

    PubMed

    Kennedy, Eileen; Fekadu, Habtamu; Ghosh, Shibani; Baral, Kedar; Davis, Dale; Sapkota, Diplav; Webb, Patrick

    2016-12-01

    Effective governance is essential for effective nutrition program implementation. There are additional challenges in launching multisector plans to enhance nutritional status. The present study compares the challenges and opportunities in Ethiopia and Nepal in designing and implementing a multisector plan for nutrition. A semi-quantitative questionnaire with open-ended questions was used to solicit information from senior national-level policy officials and other key stakeholders. The nature of the major nutrition problems in each country was similar; these include malnutrition (particularly stunting), food insecurity, and micronutrient malnutrition. The main challenges identified included the need for more specificity in the roles of agencies/individuals in program implementation, more effective mechanisms for linking national to subnational officials, methods for creating awareness of the plans, and a dedicated line item in the budgets of each agency. The level of enthusiasm was high in both countries. Respondents in both countries highlighted the need to identify a "champion" at the highest level who would keep the momentum for the respective plans alive. © The Author(s) 2016.

  16. Use of theory to plan or evaluate guideline implementation among physicians: a scoping review.

    PubMed

    Liang, Laurel; Bernhardsson, Susanne; Vernooij, Robin W M; Armstrong, Melissa J; Bussières, André; Brouwers, Melissa C; Gagliardi, Anna R

    2017-02-27

    Guidelines support health care decision-making and high quality care and outcomes. However, their implementation is sub-optimal. Theory-informed, tailored implementation is associated with guideline use. Few guideline implementation studies published up to 1998 employed theory. This study aimed to describe if and how theory is now used to plan or evaluate guideline implementation among physicians. A scoping review was conducted. MEDLINE, EMBASE, and The Cochrane Library were searched from 2006 to April 2016. English language studies that planned or evaluated guideline implementation targeted to physicians based on explicitly named theory were eligible. Screening and data extraction were done in duplicate. Study characteristics and details about theory use were analyzed. A total of 1244 published reports were identified, 891 were unique, and 716 were excluded based on title and abstract. Among 175 full-text articles, 89 planned or evaluated guideline implementation targeted to physicians; 42 (47.2%) were based on theory and included. The number of studies using theory increased yearly and represented a wide array of countries, guideline topics and types of physicians. The Theory of Planned Behavior (38.1%) and the Theoretical Domains Framework (23.8%) were used most frequently. Many studies rationalized choice of theory (83.3%), most often by stating that the theory described implementation or its determinants, but most failed to explicitly link barriers with theoretical constructs. The majority of studies used theory to inform surveys or interviews that identified barriers of guideline use as a preliminary step in implementation planning (76.2%). All studies that evaluated interventions reported positive impact on reported physician or patient outcomes. While the use of theory to design or evaluate interventions appears to be increasing over time, this review found that one half of guideline implementation studies were based on theory and many of those provided scant details about how theory was used. This limits interpretation and replication of those interventions, and seems to result in multifaceted interventions, which may not be feasible outside of scientific investigation. Further research is needed to better understand how to employ theory in guideline implementation planning or evaluation.

  17. Reasoning with inaccurate spatial knowledge. [for Planetary Rover

    NASA Technical Reports Server (NTRS)

    Doshi, Rajkumar S.; White, James E.; Lam, Raymond; Atkinson, David J.

    1988-01-01

    This paper describes work in progress on spatial planning for a semiautonomous mobile robot vehicle. The overall objective is to design a semiautonomous rover to plan routes in unknown, natural terrains. The approach to spatial planning involves deduction of common-sense spatial knowledge using geographical information, natural terrain representations, and assimilation of new and possibly conflicting terrain information. This report describes the ongoing research and implementation.

  18. A Historical Analysis of the Leadership and Strategic Plan of Chancellor Stephen R. Portch in the University System of Georgia

    ERIC Educational Resources Information Center

    Fairchild-Pierce, Jennifer Elis

    2008-01-01

    This dissertation provides historical insight into the design and implementation of one strategic plan of a public higher education system in an effort to inform future similar strategic planning processes. On July 1, 1994, the Board of Regents appointed Stephen R. Portch the ninth Chancellor of the University System of Georgia. The timing was…

  19. A Supplement to the Component Four Implementation Booklet. Broad Goal Definition in Emerald School District. SPECS: School Planning, Evaluation, and Communication System.

    ERIC Educational Resources Information Center

    Nagle, John M.; Walker, Harold E.

    The School Planning, Evaluation, and Communication System (SPECS) is an overall design for districtwide program assessment and development. It is both a way of interrelating planning and evaluation of individual programs and a way of comparing the outcomes of all district programs with the district's community-defined educational goals. This…

  20. Solar Terrestrial programs: A five year plan

    NASA Technical Reports Server (NTRS)

    Stern, D. P.

    1978-01-01

    Major projects to be initiated in the 1980-1985 period, designed to study the Sun, the heliosphere, Earth's magnetosphere, and the upper atmosphere involve the use of spacelab as well as free flying spacecraft. Current and recent investigations in these areas are reviewed and the guiding principles followed in planning future missions are examined. The implementation strategy, the planning process, and supporting research and technology are discussed.

  1. An empirical evaulation of computerized tools to aid in enroute flight planning

    NASA Technical Reports Server (NTRS)

    Smith, Philip J.; Mccoy, C. Elaine; Layton, Charles

    1993-01-01

    The paper describes an experiment using the Flight Planning Testbed (FPT) in which 27 airline dispatchers were studied. Five general questions was addresses in the study: Under what circumstances does the introduction of computer-generated suggestions (flight plans) influence the planning behavior of dispatchers; what is the nature of such influences; How beneficial are the general design concepts underlying FPT; How effective are the specific implementation decisions made in realizing these general design concepts; How effectively do dispatchers evaluate situations requiring replanning and how effectively do they identify appropriate solutions to these situations. The study leaves little doubt that the introduction of computer-generated suggestions for solving a flight planning problem can have a marked impact on the cognitive processes of the user and on the ultimate plan selected.

  2. 15 CFR 921.32 - Operation and management: Implementation of the management plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Operation and management... Reserve Designation and Subsequent Operation § 921.32 Operation and management: Implementation of the... funds to assist the state in the operation and management of the Reserve including the management of...

  3. Teacher Decision Making and the Implementation of an Integrated Arts Curriculum

    ERIC Educational Resources Information Center

    Devono, Mary K.

    2009-01-01

    This study examines the impact of teacher decision making upon implementing an integrated arts curriculum. Qualitative research methods, including interviews, lesson plan document analysis, and teacher discussion of student artwork comprise the research data from eight elementary classroom teachers. This study is designed to add to the descriptive…

  4. Infusing International Studies into the Community College Curriculum.

    ERIC Educational Resources Information Center

    Harris, Mathilda E.

    Mount Hood Community College (MHCC), with financial support from the Department of Health, Education, and Welfare (DHEW), implemented a three-year project in 1979 designed to infuse international studies into the college's liberal arts and vocational curricula. Planning for the project began after the successful implementation of a study abroad…

  5. Planning and Implementing the Daily Routine in Slovene Kindergartens and Reggio Emilia Concept

    ERIC Educational Resources Information Center

    Bercnik, Sanja; Devjak, Tatjana

    2012-01-01

    Authors in this paper present the design and implementation of daily routines in Slovenian kindergartens. Slovenian national document for preschool education, "Curriculum for Kindergartens" (1999), describes daily kindergarten activities (communication and interaction with and among children, use of compliment and reprehension, and rules…

  6. 40 CFR 63.653 - Monitoring, recordkeeping, and implementation plan for emissions averaging.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 63.120 of subpart G; and (ii) For closed vent systems with control devices, conduct an initial design..., monitoring, recordkeeping, and reporting equivalent to that required for Group 1 emission points complying... control device. (2) The source shall implement the following procedures for each miscellaneous process...

  7. A Study of "Career Pathways" Policy with Implications for School Leaders

    ERIC Educational Resources Information Center

    Ormsmith, Michael I.; Mansfield, Katherine Cumings

    2014-01-01

    This explanatory mixed-methods study began with a quantitative survey to investigate counselor beliefs and implementation behaviors related to providing college and career planning services to high school students. Survey results informed the development and implementation of interview protocol designed to provide deeper insight into counselors'…

  8. Planning and Implementing a Public Health Professional Distance Learning Program

    ERIC Educational Resources Information Center

    Escoffery, Cam; Leppke, Allison M.; Robinson, Kara B.; Mettler, Erik P.; Miner, Kathleen R.; Smith, Iris

    2005-01-01

    Training of public health professionals through web-based technology is rapidly increasing. This article describes one school of public health's effort to establish an online Master's program that serves students nationally and internationally. It examines the critical components in the design and implementation of distance education, including…

  9. 78 FR 37226 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Implementation Study. OMB No.: 0970-0398. Description: The Office of Data Analysis, Research, and Evaluation (HHS... Planning, Research, and Evaluation (HHS/ACF/OPRE) in the Administration for Children and Families (ACF... designed and implemented in the field, collect performance measure data for PREP programs, and assess the...

  10. "One-Size-Does-Not-Fit-All": Teaching MBA Students Different ERP Implementation Strategies

    ERIC Educational Resources Information Center

    Venkatesh, Viswanath

    2008-01-01

    This teaching tip discusses an approach to educating MBA students regarding strategies to select, design, and implement enterprise resource planning (ERP) systems. The teaching approach presented here discusses how to teach students about different strategies based success stories from three different organizations, namely Cisco, Tektronix, and…

  11. The Administrator's Role in Participatory Curriculum Development.

    ERIC Educational Resources Information Center

    Bratt, S. J.

    Effective curriculum implementation depends on how closely the teacher's beliefs, knowledge, and skills match curricular philosophy and demands. Curriculum designers should be a group of teachers who will be implementing the plan for learning. Astute administrative guidance is the key to ensuring a quality product. The administrator's role is as…

  12. Computer Supported Argument Visualisation: Modelling in Consultative Democracy Around Wicked Problems

    NASA Astrophysics Data System (ADS)

    Ohl, Ricky

    In this case study, computer supported argument visualisation has been applied to the analysis and representation of the draft South East Queensland Regional Plan Consultation discourse, demonstrating how argument mapping can help deliver the transparency and accountability required in participatory democracy. Consultative democracy for regional planning falls into a category of problems known as “wicked problems”. Inherent in this environment is heterogeneous viewpoints, agendas and voices, built on disparate and often contradictory logic. An argument ontology and notation that was designed specifically to deal with consultative urban planning around wicked problems is the Issue Based Information System (IBIS) and IBIS notation (Rittel & Webber, 1984). The software used for argument visualisation in this case was Compendium, a derivative of IBIS. The high volume of stakeholders and discourse heterogeneity in this environment calls for a unique approach to argument mapping. The map design model developed from this research has been titled a “Consultation Map”. The design incorporates the IBIS ontology within a hybrid of mapping approaches, amalgamating elements from concept, dialogue, argument, debate, thematic and tree-mapping. The consultation maps developed from the draft South East Queensland Regional Plan Consultation provide a transparent visual record to give evidence of the themes of citizen issues within the consultation discourse. The consultation maps also link the elicited discourse themes to related policies from the SEQ Regional Plan providing explicit evidence of SEQ Regional Plan policy-decisions matching citizen concerns. The final consultation map in the series provides explicit links between SEQ Regional Plan policy items and monitoring activities reporting on the ongoing implementation of the SEQ Regional Plan. This map provides updatable evidence of and accountability for SEQ Regional Plan policy implementation and developments.

  13. Human-Centred Design Workshops in Collaborative Strategic Design Projects: An Educational and Professional Comparison

    ERIC Educational Resources Information Center

    Liem, Andre; Sanders, Elizabeth B.-N.

    2013-01-01

    It has been found that the implementation of Human-centred Design (HCD) methods in the Fuzzy Front-End is not likely to lead to diversification in educational product planning exercises, where time lines are short and executors lack experience. Companies, interested to collaborate with Master-level Industrial Design students on strategic design…

  14. 40 CFR 52.2348 - National Highway Systems Designation Act Motor Vehicle Inspection and Maintenance (I/M) Programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false National Highway Systems Designation... IMPLEMENTATION PLANS (CONTINUED) Utah § 52.2348 National Highway Systems Designation Act Motor Vehicle Inspection... the National Highway Systems Designation Act of 1995. If Utah County fails to start its program by...

  15. 40 CFR 52.2348 - National Highway Systems Designation Act Motor Vehicle Inspection and Maintenance (I/M) Programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false National Highway Systems Designation... IMPLEMENTATION PLANS (CONTINUED) Utah § 52.2348 National Highway Systems Designation Act Motor Vehicle Inspection... the National Highway Systems Designation Act of 1995. If Utah County fails to start its program by...

  16. 40 CFR 52.2348 - National Highway Systems Designation Act Motor Vehicle Inspection and Maintenance (I/M) Programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false National Highway Systems Designation... IMPLEMENTATION PLANS (CONTINUED) Utah § 52.2348 National Highway Systems Designation Act Motor Vehicle Inspection... the National Highway Systems Designation Act of 1995. If Utah County fails to start its program by...

  17. Design of a cooperative problem-solving system for enroute flight planning: An empirical study of its use by airline dispatchers

    NASA Technical Reports Server (NTRS)

    Smith, Philip J.; Mccoy, C. Elaine; Layton, Charles; Orasanu, Judith; Chappel, Sherry; Palmer, EV; Corker, Kevin

    1993-01-01

    In a previous report, an empirical study of 30 pilots using the Flight Planning Testbed was reported. An identical experiment using the Flight Planning Testbed (FPT), except that 27 airline dispatchers were studied, is described. Five general questions were addressed in this study: (1) under what circumstances do the introduction of computer-generated suggestions (flight plans) influence the planning behavior of dispatchers (either in a beneficial or adverse manner); (2) what is the nature of such influences (i.e., how are the person's cognitive processes changed); (3) how beneficial are the general design concepts underlying FPT (use of a graphical interface, embedding graphics in a spreadsheet, etc.); (4) how effective are the specific implementation decisions made in realizing these general design concepts; and (5) how effectively do dispatchers evaluate situations requiring replanning, and how effectively do they identify appropriate solutions to these situations.

  18. Achieving walkable city in Indonesia: Policy and responsive design through public participation

    NASA Astrophysics Data System (ADS)

    Tanan, Natalia; Darmoyono, Laksmi

    2017-11-01

    This paper discusses approaches to policy and planning of pedestrian facility that facilitate walking in cities in Indonesia. It applies quantitative and qualitative methods to analyze walkability in some cities. The new perspective in policy and planning are focusing on improving non-motorized mobility; it encourages walking and put the provision of the pedestrian facility as an integral part of built environmental planning and development. The policy perceives pedestrian facility in broad, not only about physical development, but also benefit to socioeconomic activity and environmental quality. It is expected that the implementation of policies and walkability concept could upgrade the pedestrian facility, as a walkable city delivers green atmosphere of the urban environment. A design competition of pedestrian facility was held to test the policy and accommodate input from the public. Public participation through competition also enriches the design of pedestrian facility that responsive to local condition. Implementation is still a challenge due to limited budget; however, there are tendencies that few cities improve pedestrian facilities to encourage people walking in order to make the city livable and environmentally friendly.

  19. Application of automatic vehicle location in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Hansen, G. R.; Leflang, W. G.

    1976-01-01

    A set of planning guidelines for the application of automatic vehicle location (AVL) to law enforcement is presented. Some essential characteristics and applications of AVL are outlined; systems in the operational or planning phases are discussed. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. A detailed description of a typical law enforcement AVL system, and a list of vendor sources are given in appendixes.

  20. Evidence that implementation intentions can overcome the effects of smoking habits.

    PubMed

    Armitage, Christopher J

    2016-09-01

    In this study, the aim was to (a) test for the first time whether implementation intentions formed outside the laboratory can overcome the effects of habits, and (b) see whether the operation of implementation intentions could be improved by asking people to form certain "when-then" plans as opposed to uncertain "if-then" plans. The study employed a 2 × 2 fully factorial design with baseline and follow-up measures of smoking status and habits. Smokers (N = 168; circa 33 years of age; 79 women, 89 men) were randomly allocated to 1 of 2 intervention groups to form either if-then plans or when-then plans using supporting tools, or to 1 of 2 control conditions in which they were exposed to identical supporting tools but were not asked to form if-then plans or when-then plans. Certainty did not affect the operation of implementation intentions, but smokers who formed implementation intentions were significantly more likely to quit, χ2(1, N = 168) = 8.86, p < .01, and the effect was mediated by changes in smoking habits (95% CI [0.02, 0.14]). Similar effects were observed when cigarettes smoked per day, nicotine dependence, and craving served as the dependent variables. The findings demonstrate that people who have formed implementation intentions can overcome habits, such as smoking, outside the laboratory. The supporting tools described in the present research could be deployed at low cost with high public health reach to support behavior change. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  1. Design-Driven Education in Primary and Secondary School Contexts. A Qualitative Study on Teachers' Conceptions on Designing

    ERIC Educational Resources Information Center

    Heikkilä, Anni-Sofia; Vuopala, Essi; Leinonen, Teemu

    2017-01-01

    Design in educational contexts is a relatively new topic. The basic idea of design and design-driven education is that students and teachers participate together in the planning, implementation and evaluation of learning projects. However, how design-driven education should be carried out in practice is yet to be established. Therefore, the aim of…

  2. Building an Information Resource Center for Competitive Intelligence.

    ERIC Educational Resources Information Center

    Martin, J. Sperling

    1992-01-01

    Outlines considerations in the design of a Competitive Intelligence Information Resource Center (CIIRC), which is needed by business organizations for effective strategic decision making. Discussed are user needs, user participation, information sources, technology and interface design, operational characteristics, and planning for implementation.…

  3. Best management practices used by KYTC for on-site erosion control.

    DOT National Transportation Integrated Search

    2006-11-01

    New erosion control procedures (ECP) have recently been implemented by the Kentucky Transportation Cabinet (KYTC). Previously, consultants and designers developed the ECP as a part of the design plans. In many cases these did not work in the field. T...

  4. 75 FR 22675 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... expansion. Security screening expansion. Terminal restroom design. Terminal restroom remodel. Terminal... remodeling. Pavement management system. Master plan, phase 1. Decision Date: September 23, 2009. FOR FURTHER... modifications, passenger terminal. Rehabilitation of taxilane K-1. Design and implement noise mitigation...

  5. Planning and Implementation of Remote Sensing Experiments.

    DTIC Science & Technology

    Contents: TEKTITE II experiment-upwelling detection (NASA Mx 138); Design of oceanographic experiments (Gulf of Mexico, Mx 159); Design of oceanographic experiments (Gulf of Mexico, Mx 165); Experiments on thermal pollution; Remote sensing newsletter; Symposium on remote sensing in marine biology and fishery resources.

  6. Implementation of enterprise resource planning systems: a user perspective

    NASA Astrophysics Data System (ADS)

    Reitsma, E.; Hilletofth, P.; Mukhtar, U.

    2018-04-01

    The purpose of this study is to evaluate critical success factors (CSFs) for the implementation of an enterprise resource planning (ERP) system from a user perspective. Users play a vital role when implementing an ERP system, but their perspective has been neglected in the literature. A better understanding of their perspective promises to contribute to the design of more effective ERP systems, its implementation, and management. In order to identify the user perspective, a survey was conducted within three Pakistani companies that recently have implemented a new ERP system. The questionnaire was developed based on thirteen CSFs deduced from literature. Based on each CSF’s level of importance, they are ranked in order of importance and divided into three groups: most important, important and not important. Findings reveal that users believe that management should prioritize the following four CSFs when implementing an ERP system: education and training, strategic decision-making, communication, and business process alignment.

  7. MBASIC batch processor architectural overview

    NASA Technical Reports Server (NTRS)

    Reynolds, S. M.

    1978-01-01

    The MBASIC (TM) batch processor, a language translator designed to operate in the MBASIC (TM) environment is described. Features include: (1) a CONVERT TO BATCH command, usable from the ready mode; and (2) translation of the users program in stages through several levels of intermediate language and optimization. The processor is to be designed and implemented in both machine-independent and machine-dependent sections. The architecture is planned so that optimization processes are transparent to the rest of the system and need not be included in the first design implementation cycle.

  8. Knowledge-based commodity distribution planning

    NASA Technical Reports Server (NTRS)

    Saks, Victor; Johnson, Ivan

    1994-01-01

    This paper presents an overview of a Decision Support System (DSS) that incorporates Knowledge-Based (KB) and commercial off the shelf (COTS) technology components. The Knowledge-Based Logistics Planning Shell (KBLPS) is a state-of-the-art DSS with an interactive map-oriented graphics user interface and powerful underlying planning algorithms. KBLPS was designed and implemented to support skilled Army logisticians to prepare and evaluate logistics plans rapidly, in order to support corps-level battle scenarios. KBLPS represents a substantial advance in graphical interactive planning tools, with the inclusion of intelligent planning algorithms that provide a powerful adjunct to the planning skills of commodity distribution planners.

  9. Lessons in Building Capacity in Sexuality Education Using the Health Promoting School Framework: From Planning to Implementation

    ERIC Educational Resources Information Center

    Ollis, Debbie; Harrison, Lyn

    2016-01-01

    Purpose: The health promoting school model is rarely implemented in relation to sexuality education. This paper reports on data collected as part of a five-year project designed to implement a health promoting and whole school approach to sexuality education in a five campus year 1-12 college in regional Victoria, Australia. Using a community…

  10. Integration of Supportive Design Features and Technology

    ERIC Educational Resources Information Center

    Lazaros, Edward J.; Ahmadi, Reza

    2008-01-01

    Integrating supportive design features and technology into the home are excellent ways to plan to make a home "age-friendly." When an immediate need occurs for eliminating barriers in an existing home, supportive design features and technology will most often need to be examined, and some form of implementation will need to take place. While…

  11. A Sino-Finnish Initiative for Experimental Teaching Practices Using the Design Factory Pedagogical Platform

    ERIC Educational Resources Information Center

    Björklund, Tua A.; Nordström, Katrina M.; Clavert, Maria

    2013-01-01

    The paper presents a Sino-Finnish teaching initiative, including the design and experiences of a series of pedagogical workshops implemented at the Aalto-Tongji Design Factory (DF), Shanghai, China, and the experimentation plans collected from the 54 attending professors and teachers. The workshops aimed to encourage trying out interdisciplinary…

  12. From Barrier Free to Safe Environments: The New Zealand Experience. Monograph #44.

    ERIC Educational Resources Information Center

    Wrightson, William; Pope, Campbell

    Intrinsically safe design is presented as a logical extension of the principles of barrier free design, and as a higher level design strategy for effecting widespread implementation of the basic accessibility requirements for people with disabilities. Two fundamental planning procedures are proposed: including principles of safe and accessible…

  13. Interior Design and Housing. 7055. Curriculum Guide.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Vocational and Technical Education Services.

    This curriculum guide was developed as a resource for teachers to use in planning and implementing a competency-based instructional program on interior design and housing at the high school level. It contains materials for a 2-semester course, based on the North Carolina Vocational Education Program of Studies (revised 1992); it is designed to…

  14. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells grantedmore » “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.« less

  15. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Jun

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less

  16. Advanced Launch System advanced development oxidizer turbopump program: Technical implementation plan

    NASA Technical Reports Server (NTRS)

    Ferlita, F.

    1989-01-01

    The Advanced Launch Systems (ALS) Advanced Development Oxidizer Turbopump Program has designed, fabricated and demonstrated a low cost, highly reliable oxidizer turbopump for the Space Transportation Engine that minimizes the recurring cost for the ALS engines. Pratt and Whitney's (P and W's) plan for integrating the analyses, testing, fabrication, and other program efforts is addressed. This plan offers a comprehensive description of the total effort required to design, fabricate, and test the ALS oxidizer turbopump. The proposed ALS oxidizer turbopump reduces turbopump costs over current designs by taking advantage of design simplicity and state-of-the-art materials and producibility features without compromising system reliability. This is accomplished by selecting turbopump operating conditions that are within known successful operating regions and by using proven manufacturing techniques.

  17. Teaching Newton's 3rd law of motion using learning by design approach

    NASA Astrophysics Data System (ADS)

    Aquino, Jiezel G.; Caliguid, Mariel P.; Buan, Amelia T.; Magsayod, Joy R.; Lahoylahoy, Myrna E.

    2018-01-01

    This paper presents the process and implementation of Learning by Design Approach in teaching Newton's 3rd Law of Motion. A lesson activity from integrative STEM education was adapted, modified and enhanced through pilot testing. After revisions, the implementation was done to one class. The respondent's prior knowledge was first assessed by a pretest. PPIT (present the scenario, plan, implement and test) was the framework followed in the implementation of Learning by Design. Worksheets were then utilized to measure their conceptual understanding and perception. A score guide was also used to evaluate the student's output. Paired t-test analysis showed that there is a significant difference in the pretest and posttest achievement scores. This implies that the performance of the students have improved during the implementation of the Learning by Design. The Analysis of variance also depicts that the low, average and high benefited in the Learning by Design approach. The results of this study suggests that Learning by Design is an effective approach in teaching Newton's 3rd Law of Motion and thus be used in a Science classroom.

  18. Design and Implementation of a Biomimetic Turtle Hydrofoil for an Autonomous Underwater Vehicle

    PubMed Central

    Font, Davinia; Tresanchez, Marcel; Siegentahler, Cedric; Pallejà, Tomàs; Teixidó, Mercè; Pradalier, Cedric; Palacin, Jordi

    2011-01-01

    This paper presents the design and implementation of a turtle hydrofoil for an Autonomous Underwater Vehicle (AUV). The final design of the AUV must have navigation performance like a turtle, which has also been the biomimetic inspiration for the design of the hydrofoil and propulsion system. The hydrofoil design is based on a National Advisory Committee for Aeronautics (NACA) 0014 hydrodynamic profile. During the design stage, four different propulsion systems were compared in terms of propulsion path, compactness, sealing and required power. The final implementation is based on a ball-and-socket mechanism because it is very compact and provides three degrees of freedom (DoF) to the hydrofoil with very few restrictions on the propulsion path. The propulsion obtained with the final implementation of the hydrofoil has been empirically evaluated in a water channel comparing different motion strategies. The results obtained have confirmed that the proposed turtle hydrofoil controlled with a mechanism with three DoF generates can be used in the future implementation of the planned AUV. PMID:22247660

  19. TAE Plus: Transportable Applications Environment Plus tools for building graphic-oriented applications

    NASA Technical Reports Server (NTRS)

    Szczur, Martha R.

    1989-01-01

    The Transportable Applications Environment Plus (TAE Plus), developed by NASA's Goddard Space Flight Center, is a portable User Interface Management System (UIMS), which provides an intuitive WYSIWYG WorkBench for prototyping and designing an application's user interface, integrated with tools for efficiently implementing the designed user interface and effective management of the user interface during an application's active domain. During the development of TAE Plus, many design and implementation decisions were based on the state-of-the-art within graphics workstations, windowing system and object-oriented programming languages. Some of the problems and issues experienced during implementation are discussed. A description of the next development steps planned for TAE Plus is also given.

  20. 75 FR 27944 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ...; State of California; PM-10; Determination of Attainment for the Coso Junction Nonattainment Area... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing its determination that the Coso Junction... Officer, GBUAPCD, to Doris Lo, Environmental Protection Specialist, EPA, with CosoJunction2010--MetAndTEOM...

  1. Modular space station phase B extension program master plan

    NASA Technical Reports Server (NTRS)

    Munsey, E. H.

    1971-01-01

    The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

  2. CHOICE (Considering Honest Options in Career Exploration).

    ERIC Educational Resources Information Center

    Langford, Carolyn

    The Considering Honest Options in Career Exploration (CHOICE) program is a career decision-making plan designed to assist counselors and teachers in helping high school juniors and seniors develop specific written career plans that they can implement after high school. This guide includes an overview of CHOICE and three CHOICE learning modules.…

  3. Strategic survey framework for the Northwest Forest Plan survey and manage program.

    Treesearch

    Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler

    2003-01-01

    This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...

  4. Peer Tutoring: A Guide to Program Design. Research and Development Series No. 260.

    ERIC Educational Resources Information Center

    Ashley, William L.; And Others

    This publication presents guidelines for planning, implementing, and evaluating a peer tutoring program within a vocational setting. Chapter 1 discusses benefits of peer tutoring and presents a compilation of guidelines, suggestions, and examples for planning, developing, and evaluating a peer tutoring program. Tasks in each area--program…

  5. The aquatic conservation strategy of the Northwest Forest Plan.

    Treesearch

    Gordon H. Reeves; Jack E. Williams; Kelly M. Burnett; Kirsten Gallo

    2006-01-01

    Implemented in 1994, the Aquatic Conservation Strategy of the Northwest Forest Plan was designed to restore and maintain ecological processes for aquatic and riparian area conservation on federal lands in the western portion of the Pacific Northwest. We used decision support models to quantitatively evaluate changes in the condition of selected watersheds. In the...

  6. A Computer Simulation Modeling Tool to Assist Colleges in Long-Range Planning. Final Report.

    ERIC Educational Resources Information Center

    Salmon, Richard; And Others

    Long-range planning involves the establishment of educational objectives within a rational philosophy, the design of activities and programs to meet stated objectives, the organization and allocation of resources to implement programs, and the analysis of results in terms of the objectives. Current trends of educational growth and complexity…

  7. Virtual Realities: A School Leader's Guide to Online Education. A Technology Leadership Network Special Report.

    ERIC Educational Resources Information Center

    Abdal-Haqq, Ismat, Ed.

    This book is designed to provide practical information about planning and operating virtual, or online, schools. It discusses and illustrates promising practices and successful models and approaches; provides planning resources for implementation; presents costs and benefits of launching virtual schools; offers preventive strategies that help…

  8. 78 FR 20868 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ... chemical reactions from precursor gases (e.g., secondary particles). Secondary particles, such as sulfates, nitrates, and complex carbon compounds, are formed from reactions with oxides of sulfur (SO X ), oxides of... nonattainment new source review (nonattainment NSR) permit programs; provisions for air pollution modeling; and...

  9. Make Waves: Read! 1998 Summer Library Program Manual. Bulletin No. 98107.

    ERIC Educational Resources Information Center

    Roeber, Jane A., Ed.

    This manual is designed to help individual libraries in Wisconsin plan and implement their summer library programs. The manual is divided into six sections. Section 1 covers planning and promoting programs, and includes reproducible promotional materials, sample letters to parents, and sample media materials. Section 2 provides decorating and…

  10. 24 CFR 598.205 - What are the requirements for nomination?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... that the strategic plan described in § 598.215 will be implemented, and these governments submit its... strategic plan, as described in § 598.215; (3) Include the certifications described in § 598.210; (4... designation process. (Approved by the Office of Management and Budget under Control Number 2506-0148) [63 FR...

  11. Preparing the Mentally Retarded in the Areas of Food Preparation and Service.

    ERIC Educational Resources Information Center

    Mattson, Bruce D.; And Others

    The report of a project for planning a training program for the mentally retarded in the areas of food preparation and service summarizes activities of the planning project and makes recommendations for possible implementation. The training program is designed for educable mentally retarded youth who would benefit from specific vocational…

  12. [Design of a HACCP Plan for the Gouda-type cheesemaking process in a milk processing plant].

    PubMed

    Dávila, Jacqueline; Reyes, Genara; Corzo, Otoniel

    2006-03-01

    The Hazard Analysis and Critical Control Point (HACCP) is a preventive and systematic method used to identify, assess and control of the hazards related with raw material, ingredients, processing, marketing and intended consumer in order to assure the safety of the food. The aim of this study was to design a HACCP plan for implementing in a Gouda-type cheese-making process in a dairy processing plant. The used methodology was based in the application of the seven principles of the HACCP, the information from the plant about the compliment of the pre-requisite programs (70-80%), the experience of the HACCP team and the sequence of stages settles down by the COVENIN standard 3802 for implementing the HACCP system. A HACCP plan was proposed with the scope, the selection of HACCP team, the description of the product and the intended use, the flow diagram of the process, the hazard analysis and the control table of the plan with the critical control points (CCP). The following CCP were identified in the process: pasteurization, coagulation and ripening.

  13. West Valley demonstration project: Implementation of the kerosene mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.

    1987-05-01

    An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab.

  14. Implementation of the Large-Scale Operations Management Test in the State of Washington.

    DTIC Science & Technology

    1982-12-01

    During FY 79, the U.S. Army Engineer Waterways Experiment Station (WES), Vicksburg, Miss., completed the first phase of its 3-year Large-Scale Operations Management Test (LSOMT). The LSOMT was designed to develop an operational plan to identify methodologies that can be implemented by the U.S. Army Engineer District, Seattle (NPS), to prevent the exotic aquatic macrophyte Eurasian watermilfoil (Myrophyllum spicatum L.) from reaching problem-level proportions in water bodies in the state of Washington. The WES developed specific plans as integral elements

  15. Ecology and policy for exclusive breastfeeding in Colombia: a proposal

    PubMed Central

    2012-01-01

    Introduction: Breastfeeding promotion is one of the most important strategies against infant mortality and to control child undernourishment. Despite policies and plans to promote and protect breastfeeding in Colombia, its practice is low and its duration is short. Objective: To propose an ecology framework to interpret and incorporate contextual, interpersonal, and individual factors associated with the practice of breastfeeding and duration. Thereby, the plans and policies addressed to promote and protect breastfeeding in Colombia could be reinforced. Conclusions: To implement an ecology framework for Breastfeeding in Colombia, it is necessary to identify the effect of contextual factors in the biggest cultural regions of Colombia, to recognize the limitations of Infant-Friendly Hospital Initiatives to improve exclusive breastfeeding duration, to execute prospective studies in order to identify factors associated with breastfeeding duration, to design and implement plans and policies based on comprehensive planning strategies of healthcare interventions, to develop appropriate and cost-effective extra-institutional strategies aimed at prolonging the duration of breastfeeding, and to implement more reliable breastfeeding surveillance systems. PMID:24893193

  16. Designing and Implementing a Jointly-Planned Unit: Expanding Thematic Units beyond the Textbook.

    ERIC Educational Resources Information Center

    Anderson, Laurel M.

    A first-grade teacher included her students in her planning of a unit of study. The teacher explained to the students how she planned a unit and invited the students to volunteer ideas for the topic. The topic chosen was space and aliens. The teacher and students discussed what they already knew about the topic, what they wanted to learn about it,…

  17. Superfund record of decision (EPA Region 4): USMC Camp Lejeune Military Reservation, operable unit 4, Jacksonville, NC, January 16, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-05-01

    This operable unit consists of Sites 41 and 74. The remedial actions are designed to prevent future potential exposure by implementing institutional controls. These controls include: (1) designate the sites as `restricted` or `limited use` areas, within the base master plan; (2) prohibit the installation of potable water supply wells within the vicinity of the sites: and (3) implement a groundwater, surface water and sediment monitoring program.

  18. A neo-strategic planning approach to enhance local tobacco control programs.

    PubMed

    Douglas, Malinda R; Carter, Sara Sally R; Wilson, Andrew P; Chan, Andie

    2015-01-01

    Research in tobacco control demonstrating best practices is widely disseminated; however, application at the local level is often difficult. Translating research into practice requires a concerted effort to develop an understanding of the evidence and how it can be applied within diverse contexts. A strategic planning infrastructure was developed to support the translation of evidence-based interventions into community practice. This paper highlights the strategic process of turning "know-what" into "know-how" to facilitate the strategic planning and implementation of tobacco control best practices at the local level. The purpose, people, process, and product strategies of knowledge management and translation provided a framework for the strategic planning infrastructure. The knowledge translation concepts of audience, motivations, and mechanisms were synergized in the neo-strategic planning component design. The participants were 20 community coalitions funded to implement local tobacco control programs. From 2004 to 2011, the strategic planners facilitated a cyclical process to translate research into practice using a trio of integrated tools, skill-building workshops on strategic planning, and grantee-driven technical assistance and consultation. In the short term, the usefulness of the strategic planning components to the programs was measured. The intermediate outcome was the successful movement of the community programs from the planning stage to the implementation stage. The achievement of community-level changes in planned tobacco control efforts was the overall outcome measure for the success of the local coalitions. Seventeen of 20 communities that began the planning process implemented strategic plans. All 17 of the programs implemented evidence-based practices, resulting in numerous tobacco-free policies, increased cessation, and increased support from the media and community. Bridging the gap between research and practice can enhance the practicality, efficiency, and effectiveness of tobacco control programs at the local level, maximizing the potential positive health impact. Copyright © 2015 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  19. E-Learning Systems: Promises and Pitfalls

    ERIC Educational Resources Information Center

    Chan, Carlyle H.; Robbins, Lisa I.

    2006-01-01

    Objective: This review examines the use of e-learning systems in psychiatric education. Method: The authors review the Instructional System Design process, focusing on ADDIE (Analysis, Design, Development, Implementation, and Evaluation). The authors also report on two representative teaching projects, discussing the planning, work, and assessment…

  20. A strategic planning methodology for aircraft redesign

    NASA Astrophysics Data System (ADS)

    Romli, Fairuz Izzuddin

    Due to a progressive market shift to a customer-driven environment, the influence of engineering changes on the product's market success is becoming more prominent. This situation affects many long lead-time product industries including aircraft manufacturing. Derivative development has been the key strategy for many aircraft manufacturers to survive the competitive market and this trend is expected to continue in the future. Within this environment of design adaptation and variation, the main market advantages are often gained by the fastest aircraft manufacturers to develop and produce their range of market offerings without any costly mistakes. This realization creates an emphasis on the efficiency of the redesign process, particularly on the handling of engineering changes. However, most activities involved in the redesign process are supported either inefficiently or not at all by the current design methods and tools, primarily because they have been mostly developed to improve original product development. In view of this, the main goal of this research is to propose an aircraft redesign methodology that will act as a decision-making aid for aircraft designers in the change implementation planning of derivative developments. The proposed method, known as Strategic Planning of Engineering Changes (SPEC), combines the key elements of the product redesign planning and change management processes. Its application is aimed at reducing the redesign risks of derivative aircraft development, improving the detection of possible change effects propagation, increasing the efficiency of the change implementation planning and also reducing the costs and the time delays due to the redesign process. To address these challenges, four research areas have been identified: baseline assessment, change propagation prediction, change impact analysis and change implementation planning. Based on the established requirements for the redesign planning process, several methods and tools that are identified within these research areas have been abstracted and adapted into the proposed SPEC method to meet the research goals. The proposed SPEC method is shown to be promising in improving the overall efficiency of the derivative aircraft planning process through two notional aircraft system redesign case studies that are presented in this study.

  1. Strategies and Exemplars for Public Outreach Events: Planning, Implementation, Evaluation

    NASA Astrophysics Data System (ADS)

    Cobb, W. H.; Buxner, S.; Shipp, S. S.; Shebby, S.

    2015-12-01

    IntroductionEach year the National Aeronautics and Space Administration (NASA) sponsors a variety of public outreach events to share information with educators, students, and the general public. These events are designed to increase interest in and awareness of the mission and goals of NASA. Planning and implementation best practices gleaned from the NASA SMD Education's review of large-scale events, "Best Practices in Outreach Events" will be shared. Outcomes from an event, i C Ceres, celebrating the Dawn mission's arrival at dwarf planet Ceres that utilized these strategies will be shared. Best practices included can be pertinent for all event organizers and evaluators regardless of event size. BackgroundThe literature review focused on identifying evaluations of large-scale public outreach events—and, within these evaluations, identifying best practices. The following criteria for identifying journal articles and reports to potentially include: Public, science-related events open to adults and children. Events with more than 1,000 attendees. Events that occurred during the last 5 years. Evaluations that included information on data collected from visitors and/or volunteers. Evaluations that specified the type of data collected, methodology, and associated results. Planning and Implementation Best PracticesThe literature review revealed key considerations for planning and of large-scale events implementing events. A summary of related best practices is presented below. 1) Advertise the event 2) Use and advertise access to scientists 3) Recruit scientists using these findings 4) Ensure that the event is group and particularly child friendly 5) Target specific event outcomes Best Practices Informing Real-world Planning, Implementation and EvaluationDawn mission's collaborative design of a series of events, i C Ceres, including in-person, interactive events geared to families and live presentations will be shared. Outcomes and lessons learned will be imparted rising from these events and their evaluation. There will be a focus on the family event, in particular the evidence that scientist participation was a particular driver for the event's impact and success.

  2. Planning in the Continuous Operations Environment of the International Space Station

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa; Hagopian, Jeff

    1996-01-01

    The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

  3. Fitting Community Based Newborn Care Package into the health systems of Nepal.

    PubMed

    Pradhan, Y V; Upreti, S R; Kc, N P; Thapa, K; Shrestha, P R; Shedain, P R; Dhakwa, J R; Aryal, D R; Aryal, S; Paudel, D C; Paudel, D; Khanal, S; Bhandari, A; Kc, A

    2011-10-01

    Community-based strategies for delivering effective newborn interventions are an essential step to avert newborn death, in settings where the health facilities are unable to effectively deliver the interventions and reach their population. Effective implementation of community-based interventions as a large scale program and within the existing health system depends on the appropriate design and planning, monitoring and support systems. This article provides an overview of implementation design of Community-Based Newborn Care Package (CB-NCP) program, its setup within the health system, and early results of the implementation from one of the pilot districts. The evaluation of CB-NCP in one of the pilot districts shows significant improvement in antenatal, intrapartum and post natal care. The implementation design of the CB-NCP has six different health system management functions: i) district planning and orientation, ii) training/human resource development, iii) monitoring and evaluation, iv) logistics and supply chain management, v) communication strategy, and vi) pay for performance. The CB-NCP program embraced the existing system of monitoring with some additional components for the pilot phase to test implementation feasibility, and aligns with existing safe motherhood and child health programs. Though CB-NCP interventions are proven independently in different local and global contexts, they are piloted in 10 districts as a "package" within the national health system settings of Nepal.

  4. Summary of Planned Implementation for the HTGR Lessons Learned Applicable to the NGNP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ian Mckirdy

    2011-09-01

    This document presents a reconciliation of the lessons learned during a 2010 comprehensive evaluation of pertinent lessons learned from past and present high temperature gas-cooled reactors that apply to the Next Generation Nuclear Plant Project along with current and planned activities. The data used are from the latest Idaho National Laboratory research and development plans, the conceptual design report from General Atomics, and the pebble bed reactor technology readiness study from AREVA. Only those lessons related to the structures, systems, and components of the Next Generation Nuclear Plant (NGNP), as documented in the recently updated lessons learned report are addressed.more » These reconciliations are ordered according to plant area, followed by the affected system, subsystem, or component; lesson learned; and finally an NGNP implementation statement. This report (1) provides cross references to the original lessons learned document, (2) describes the lesson learned, (3) provides the current NGNP implementation status with design data needs associated with the lesson learned, (4) identifies the research and development being performed related to the lesson learned, and (5) summarizes with a status of how the lesson learned has been addressed by the NGNP Project.« less

  5. Implementation of a Web-Based Collaborative Process Planning System

    NASA Astrophysics Data System (ADS)

    Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi

    Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.

  6. Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

    NASA Technical Reports Server (NTRS)

    Dunbar, J. C.

    1972-01-01

    The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

  7. Design and Laboratory Implementation of Autonomous Optimal Motion Planning for Non-Holonomic Planetary Rovers

    DTIC Science & Technology

    2012-12-01

    autonomy helped to maximize a Mars day journey, because humans could only plan the first portion of the journey based on images sent from the rover...safe trajectory based on its sensors [1]. The distance between Mars and Earth ranges from 100-200 million miles [1] and at this distance, the time...This feature worked for the pre- planned maneuvers, which were planned by humans the day before based on available sensory and visual inputs. Once the

  8. Application of mobile digital communications in law enforcement, an introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Abraham, J. E.; Leflang, W. G.; Kennedy, R. D.; Wilson, J. H.; Gurfield, R. M.

    1975-01-01

    A set of planning guidelines for the application of digital communications techniques to law enforcement use is presented. Some essential characteristics of digital techniques and their applications are outlined, as are some principles of system analysis, evaluation, and planning. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with respect to this application problem. Information on law enforcement digital communications systems and equipment and a list of vendor sources are given in appendices.

  9. Application of computer-aided dispatch in law enforcement: An introductory planning guide

    NASA Technical Reports Server (NTRS)

    Sohn, R. L.; Gurfield, R. M.; Garcia, E. A.; Fielding, J. E.

    1975-01-01

    A set of planning guidelines for the application of computer-aided dispatching (CAD) to law enforcement is presented. Some essential characteristics and applications of CAD are outlined; the results of a survey of systems in the operational or planning phases are summarized. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Detailed descriptions of typical law enforcement CAD systems, and a list of vendor sources, are given in appendixes.

  10. Design, Implementation, and Evaluation of a Postgraduate Diploma in Surgical Anatomy

    ERIC Educational Resources Information Center

    Stringer, Mark D.; Lyall, Patrick

    2012-01-01

    After careful planning, a postgraduate Diploma in Surgical Anatomy was launched in 2009. This report describes the structure of the program, the challenges encountered in implementing and running the course, and results of evaluations. The qualification is targeted at junior doctors intending to become surgeons or radiologists and aims to equip…

  11. Examining Success Factors Related to ERP Implementations in Higher Education Shared Services Projects

    ERIC Educational Resources Information Center

    Stoyanoff, Dawn Galadriel Pfeiffer

    2012-01-01

    This study examined the enterprise resource planning (ERP) implementations that utilized a shared services model in higher education. The purpose of this research was to examine the critical success factors which were perceived to contribute to project success. This research employed a quantitative non-experimental correlational design and the…

  12. ViSC Social Competence Program

    ERIC Educational Resources Information Center

    Strohmeier, Dagmar; Hoffmann, Christine; Schiller, Eva-Maria; Stefanek, Elisabeth; Spiel, Christiane

    2012-01-01

    The ViSC Social Competence Program has been implemented in Austrian schools within the scope of a national strategy plan, Together Against Violence. The program is a primary preventive program designed for grades 5 to 8. The prevention of aggression and bullying is defined as a school development task, and the initial implementation of the program…

  13. Local Implementation and Land Use Decision Making.

    ERIC Educational Resources Information Center

    Garlasco, Chris; And Others

    This material includes student guide sheets, reference material, and tape script for the audio-tutorial unit on Local Implementation. An audio tape is used with the materials. The material is designed for use with Connecticut schools, but can be adapted to other localities. The material in this unit emphasizes the role of planning and zoning in…

  14. 75 FR 59090 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    .... These revisions include the suspension of a local wintertime cleaner burning gasoline rule, and the relaxation of a State rule governing wintertime gasoline in Clark County. EPA's proposed approval of the... limit in the State wintertime gasoline rule, if necessary, to implement the related contingency measure...

  15. Implementing Educational Software and Evaluating Its Academic Effectiveness: Part I.

    ERIC Educational Resources Information Center

    Jolicoeur, Karen; Berger, Dale E.

    1988-01-01

    This basic plan for implementing educational software in the classroom incorporates a research design for evaluating its effectiveness. A study of fifth grade classrooms using game and tutorial software for spelling and fractions is used as an example. Topics discussed include software selection, selecting groups of comparable ability, and use of…

  16. Mathematics-Literacy Checklists: A Pedagogical Innovation to Support Teachers as They Implement the Common Core

    ERIC Educational Resources Information Center

    del Prado Hill, Pixita; Friedland, Ellen S.; McMillen, Susan

    2016-01-01

    This article presents two innovative tools--the Mathematics-Literacy Planning Framework and Mathematics-Literacy Implementation Checklist--which are designed to help instructional coaches and specialists support teachers to meet the challenges of the mathematics-literacy integration goals of the Common Core. Developed with teacher input, these…

  17. Preventing Substance Abuse: A Guide for School Counselors.

    ERIC Educational Resources Information Center

    Sales, Amos

    The focus of this book is on the identification of practical knowledge and skill needed and an action plan to implement prevention programming in schools. The text is written as a resource for practitioners, students, and faculty in school counseling. It is designed to facilitate development of knowledge necessary to implement comprehensive…

  18. Implementing Strategic Change: A Practical Guide for Business.

    ERIC Educational Resources Information Center

    Grundy, Tony

    This book is designed to serve as a practical guide to planning and managing change within a business, and as a text for graduate business students studying change strategies. It focuses on the rationale for change, managing the change process, tools for change, creating a strategic vision for change, and checklists for implementing strategic…

  19. Integrated Sociology Program Assessment: Inclusion of a Senior Portfolio Graduation Requirement

    ERIC Educational Resources Information Center

    Crockett, Jason L.; Fu, Albert S.; Greenwood, Joleen L.; John, Mauricia A.

    2018-01-01

    This article presents information about the planning, implementation, and findings of an assessment-based student portfolio designed by the faculty of a sociology program at Kutztown University of Pennsylvania, a midsized public regional liberal arts institution. First, we briefly present the rationale for implementing a portfolio system and the…

  20. A Framework for Implementing Individualized Self-Regulated Learning Strategies in the Classroom

    ERIC Educational Resources Information Center

    Ness, Bryan M.; Middleton, Michael J.

    2012-01-01

    Self-regulated learning (SRL) is a conceptual model that can be used to design and implement individualized learning strategies for students with learning disabilities. Students who self-regulate their learning engage in planning, performance, and self-evaluation during academic tasks. This article highlights one approach for teaching SRL skills…

  1. Alternative Education for Disruptive Youth: Recommended Parameters and Best Practices for Effective Programs

    ERIC Educational Resources Information Center

    Pennsylvania Department of Education, 2005

    2005-01-01

    This document was prepared to serve as an aid in the planning, design, implementation, and ongoing evaluation of Alternative Education for Disruptive Youth Programs in Pennsylvania. School Codes and Public Laws are cited for guidance on mandatory issues. The suggestions and implementation strategies provided in this document are not requirements…

  2. Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

    NASA Technical Reports Server (NTRS)

    Garrocq, C. A.; Hurley, M. J.; Dublin, M.

    1973-01-01

    A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

  3. ThermoData Engine (TDE): software implementation of the dynamic data evaluation concept. 5. Experiment planning and product design.

    PubMed

    Diky, Vladimir; Chirico, Robert D; Kazakov, Andrei F; Muzny, Chris D; Magee, Joseph W; Abdulagatov, Ilmutdin; Kang, Jeong Won; Kroenlein, Kenneth; Frenkel, Michael

    2011-01-24

    ThermoData Engine (TDE) is the first full-scale software implementation of the dynamic data evaluation concept, as reported recently in this journal. In the present paper, we describe development of an algorithmic approach to assist experiment planning through assessment of the existing body of knowledge, including availability of experimental thermophysical property data, variable ranges studied, associated uncertainties, state of prediction methods, and parameters for deployment of prediction methods and how these parameters can be obtained using targeted measurements, etc., and, indeed, how the intended measurement may address the underlying scientific or engineering problem under consideration. A second new feature described here is the application of the software capabilities for aid in the design of chemical products through identification of chemical systems possessing desired values of thermophysical properties within defined ranges of tolerance. The algorithms and their software implementation to achieve this are described. Finally, implementation of a new data validation and weighting system is described for vapor-liquid equilibrium (VLE) data, and directions for future enhancements are outlined.

  4. Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan

    NASA Technical Reports Server (NTRS)

    Klus, W. L.

    1987-01-01

    A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.

  5. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... DEVELOPMENT COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS Empowerment Zone... requirements that the state and local governments, as Empowerment Zone designees, have agreed to meet as...

  6. Barriers to Advance Care Planning at the End of Life: An Explanatory Systematic Review of Implementation Studies

    PubMed Central

    Lund, Susi; Richardson, Alison; May, Carl

    2015-01-01

    Context Advance Care Plans (ACPs) enable patients to discuss and negotiate their preferences for the future including treatment options at the end of life. Their implementation poses significant challenges. Objective To investigate barriers and facilitators to the implementation of ACPs, focusing on their workability and integration in clinical practice. Design An explanatory systematic review of qualitative implementation studies. Data sources Empirical studies that reported interventions designed to support ACP in healthcare. Web of Knowledge, Ovid MEDLINE, CINAHL, PsycINFO, British Nursing Index and PubMed databases were searched. Methods Direct content analysis, using Normalization Process Theory, to identify and characterise relevant components of implementation processes. Results 13 papers identified from 166 abstracts were included in the review. Key factors facilitating implementation were: specially prepared staff utilizing a structured approach to interactions around ACPs. Barriers to implementation were competing demands of other work, the emotional and interactional nature of patient-professional interactions around ACPs, problems in sharing decisions and preferences within and between healthcare organizations. Conclusions This review demonstrates that doing more of the things that facilitate delivery of ACPs will not reduce the effects of those things that undermine them. Structured tools are only likely to be partially effective and the creation of a specialist cadre of ACP facilitators is unlikely to be a sustainable solution. The findings underscore both the challenge and need to find ways to routinely incorporate ACPs in clinical settings where multiple and competing demands impact on practice. Interventions most likely to meet with success are those that make elements of Advance Care Planning workable within complex and time pressured clinical workflows. PMID:25679395

  7. SU-E-T-595: Design of a Graphical User Interface for An In-House Monte Carlo Based Treatment Planning System: Planning and Contouring Tools

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    EMAM, M; Eldib, A; Lin, M

    2014-06-01

    Purpose: An in-house Monte Carlo based treatment planning system (MC TPS) has been developed for modulated electron radiation therapy (MERT). Our preliminary MERT planning experience called for a more user friendly graphical user interface. The current work aimed to design graphical windows and tools to facilitate the contouring and planning process. Methods: Our In-house GUI MC TPS is built on a set of EGS4 user codes namely MCPLAN and MCBEAM in addition to an in-house optimization code, which was named as MCOPTIM. Patient virtual phantom is constructed using the tomographic images in DICOM format exported from clinical treatment planning systemsmore » (TPS). Treatment target volumes and critical structures were usually contoured on clinical TPS and then sent as a structure set file. In our GUI program we developed a visualization tool to allow the planner to visualize the DICOM images and delineate the various structures. We implemented an option in our code for automatic contouring of the patient body and lungs. We also created an interface window displaying a three dimensional representation of the target and also showing a graphical representation of the treatment beams. Results: The new GUI features helped streamline the planning process. The implemented contouring option eliminated the need for performing this step on clinical TPS. The auto detection option for contouring the outer patient body and lungs was tested on patient CTs and it was shown to be accurate as compared to that of clinical TPS. The three dimensional representation of the target and the beams allows better selection of the gantry, collimator and couch angles. Conclusion: An in-house GUI program has been developed for more efficient MERT planning. The application of aiding tools implemented in the program is time saving and gives better control of the planning process.« less

  8. "I Know This Is Supposed to Be More Like the Real World, but . . .": Student Perceptions of a PBL Implementation in an Undergraduate Materials Science Course

    ERIC Educational Resources Information Center

    Henry, Holly R.; Tawfik, Andrew A.; Jonassen, David H.; Winholtz, Robert A.; Khanna, Sanjeev

    2012-01-01

    This qualitative case study examines the initial implementation of a problem-based version of an undergraduate course in materials science for the purpose of identifying areas of improvement to the curriculum prior to a planned second implementation. The course was designed around problems that students work in small teams to solve under the…

  9. Considerations in Designing and Implementing Enhancements to COSTAR

    PubMed Central

    Piggins, Judith; McLatchey, John; Zielstorff, Rita; Barrett, Suzanne; Smith, Monica; Weidman-Dahl, Frances; Brown, Kibbe; Barnett, G. Octo

    1982-01-01

    The addition of enhancements to a COSTAR system can involve a significant investment of effort. This paper describes recent experience in implementing two major COSTAR enhancements, namely a patient-specific encounter form and an order entry and dispatch subsystem. A number of points to be considered in regard to planning and implementing such enhancements are raised, and the relative success of these two enhancements at one particular site is discussed.

  10. Planning and Implementing Immunization Billing Programs at State and Local Health Departments: Barriers and Possible Solutions.

    PubMed

    Corriero, Rosemary; Redmon, Ginger

    Before participating in a project funded by the Centers for Disease Control and Prevention, most state and local health departments (LHDs) were not seeking reimbursement or being fully reimbursed by insurance plans for the cost of immunization services (including vaccine costs and administration fees) they provided to insured patients. Centers for Disease Control and Prevention's Billables Project was designed to enable state and LHDs to bill public and private insurance plans for immunization services provided to insured patients. Identify and describe key barriers state and LHDs may encounter while planning and implementing a billing program, as well as possible solutions for overcoming those barriers. This study used reports from Billables Project participants to explore barriers they encountered when planning and implementing a billing program and steps taken to address those barriers. Thirty-eight state immunization programs. Based on project participants' reports, barriers were noted in 7 categories: (1) funding and costs, (2) staff, (3) health department characteristics, (4) third-party payers and insurance plans, (5) software, (6) patient insurance status, and (7) other barriers. Possible solutions for overcoming those barriers included hiring or seeking external help, creating billing guides and training modules, streamlining workflows, and modifying existing software systems. Overcoming barriers during planning and implementation of a billing program can be challenging for state and LHDs, but the experiences and suggestions of past Billables Project participants can help guide future billing program efforts.

  11. A Preliminary Operations Manual for Vocational Assessment of Special Needs Students.

    ERIC Educational Resources Information Center

    Petzy, Vic

    This document is designed to assist school personnel in the planning, development, and implementation of vocational assessment approaches for special needs students. The intended audience includes administrators, coordinators, counsellors, or teachers who are interested in designing vocational assessment procedures which maximize the use of…

  12. Development of a Design Tool for Planning Aqueous Amendment Injection Systems

    DTIC Science & Technology

    2012-08-01

    Chemical Oxidation with Permanganate (MnO4- ) ...................................... 2 1.4 IMPLEMENTATION ISSUES...17 6.4 SS DESIGN TOOL DEVELOPMENT AND EVALUATION ........................... 19 7.0 CHEMICAL OXIDATION WITH PERMANGANATE ...21 7.1 NUMERICAL MODELING OF PERMANGANATE DISTRIBUTION ........... 21 7.2 CDISCO DEVELOPMENT AND EVALUATION

  13. 34 CFR 606.7 - What definitions apply?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... implementation plan designed to meet one or more objectives. An activity is a part of a project and has its own... or improved programs and services, beyond those regularly budgeted, specifically designed to improve... expended by an institution of higher education for instruction, research, public service, academic support...

  14. 34 CFR 607.7 - What definitions apply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... incorporated into an implementation plan designed to meet one or more objectives. An activity is a part of a..., specifically designed to improve the self sufficiency of the school. Educational and general expenditures means the total amount expended by an institution of higher education for instruction, research, public...

  15. 34 CFR 607.7 - What definitions apply?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... incorporated into an implementation plan designed to meet one or more objectives. An activity is a part of a..., specifically designed to improve the self sufficiency of the school. Educational and general expenditures means the total amount expended by an institution of higher education for instruction, research, public...

  16. 34 CFR 606.7 - What definitions apply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... implementation plan designed to meet one or more objectives. An activity is a part of a project and has its own... or improved programs and services, beyond those regularly budgeted, specifically designed to improve... expended by an institution of higher education for instruction, research, public service, academic support...

  17. 34 CFR 606.7 - What definitions apply?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... implementation plan designed to meet one or more objectives. An activity is a part of a project and has its own... or improved programs and services, beyond those regularly budgeted, specifically designed to improve... expended by an institution of higher education for instruction, research, public service, academic support...

  18. 34 CFR 607.7 - What definitions apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... incorporated into an implementation plan designed to meet one or more objectives. An activity is a part of a..., specifically designed to improve the self sufficiency of the school. Educational and general expenditures means the total amount expended by an institution of higher education for instruction, research, public...

  19. 34 CFR 607.7 - What definitions apply?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... incorporated into an implementation plan designed to meet one or more objectives. An activity is a part of a..., specifically designed to improve the self sufficiency of the school. Educational and general expenditures means the total amount expended by an institution of higher education for instruction, research, public...

  20. 34 CFR 607.7 - What definitions apply?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... incorporated into an implementation plan designed to meet one or more objectives. An activity is a part of a..., specifically designed to improve the self sufficiency of the school. Educational and general expenditures means the total amount expended by an institution of higher education for instruction, research, public...

  1. 34 CFR 606.7 - What definitions apply?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... implementation plan designed to meet one or more objectives. An activity is a part of a project and has its own... or improved programs and services, beyond those regularly budgeted, specifically designed to improve... expended by an institution of higher education for instruction, research, public service, academic support...

  2. 34 CFR 606.7 - What definitions apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... implementation plan designed to meet one or more objectives. An activity is a part of a project and has its own... or improved programs and services, beyond those regularly budgeted, specifically designed to improve... expended by an institution of higher education for instruction, research, public service, academic support...

  3. Multi-Protocol LAN Design and Implementation: A Case Study.

    ERIC Educational Resources Information Center

    Hazari, Sunil

    1995-01-01

    Reports on the installation of a local area network (LAN) at East Carolina University. Topics include designing the network; computer labs and electronic mail; Internet connectivity; LAN expenses; and recommendations on planning, equipment, administration, and training. A glossary of networking terms is also provided. (AEF)

  4. What can the past of pay-for-performance tell us about the future of Value-Based Purchasing in Medicare?

    PubMed

    Ryan, Andrew M; Damberg, Cheryl L

    2013-06-01

    The Medicare program has implemented pay-for-performance (P4P), or Value-Based Purchasing, for inpatient care and for Medicare Advantage plans, and plans to implement a program for physicians in 2015. In this paper, we review evidence on the effectiveness of P4P and identify design criteria deemed to be best practice in P4P. We then assess the extent to which Medicare's existing and planned Value-Based Purchasing programs align with these best practices. Of the seven identified best practices in P4P program design, the Hospital Value-Based Purchasing program is strongly aligned with two of the best practices, moderately aligned with three, weakly aligned with one, and has unclear alignment with one best practice. The Physician Value-Based Purchasing Modifier is strongly aligned with two of the best practices, moderately aligned with one, weakly aligned with three, and has unclear alignment with one of the best practices. The Medicare Advantage Quality Bonus Program is strongly aligned with four of the best practices, moderately aligned with two, and weakly aligned with one of the best practices. We identify enduring gaps in P4P literature as it relates to Medicare's plans for Value-Based Purchasing and discuss important issues in the future of these implementations in Medicare. Copyright © 2013 Elsevier Inc. All rights reserved.

  5. State Emergency Response Commissions

    EPA Pesticide Factsheets

    The Governor of each state has designated a State Emergency Response Commission (SERC) that is responsible for implementing the Emergency Planning and Community Right-to-Know Act (EPCRA) provisions within its state.

  6. Matrix evaluation of science objectives

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.

    1994-01-01

    The most fundamental objective of all robotic planetary spacecraft is to return science data. To accomplish this, a spacecraft is fabricated and built, software is planned and coded, and a ground system is designed and implemented. However, the quantitative analysis required to determine how the collection of science data drives ground system capabilities has received very little attention. This paper defines a process by which science objectives can be quantitatively evaluated. By applying it to the Cassini Mission to Saturn, this paper further illustrates the power of this technique. The results show which science objectives drive specific ground system capabilities. In addition, this process can assist system engineers and scientists in the selection of the science payload during pre-project mission planning; ground system designers during ground system development and implementation; and operations personnel during mission operations.

  7. Internationalization of medical education in Iran: A way towards implementation of the plans of development and innovation in medical education

    PubMed Central

    SHAMSI GOOSHKI, EHSAN; POURABBASI, ATA; AKBARI, HAMID; REZAEI, NIMA; ARAB KHERADMAND, ALI; KHEIRY, ZAHRA; PEYKARI, NILOUFAR; MOMENI JAVID, FATEREH; HAJIPOUR, FIROUZEH; LARIJANI, BAGHER

    2018-01-01

    Introduction: Academic institutions are the most important organizations for implementation of internationalization policies and practices for integrating an international, intercultural and global dimension in higher education system. Also, a globally increasing demand for higher education has been seen in the past two decades so that the number of students enrolled in higher education institutions in the worldwide nation-states has increased dramatically. The National Plan of International Development of Medical Education was designed with the aim of identifying available potentials in all the universities of medical sciences, encouraging the development of international standards of medical education, and planning for the utilization of the existing capacity in Islamic republic of Iran. Methods: Authors have tried to review the several aspects of international activities in higher education in the world and describe national experiences and main policies in globalization of medical education in Iran within implementation of the National Plan for Development and Innovation in Medical Education. Results: The findings of some global experiences provide the policy makers with clear directions in order to develop internationalization of higher education. Conclusion: The Program for International Development of Medical Education was designed by the Deputy of Education in the Ministry of Health and the effective implementation of this Program was so important for promotion of Iranian medical education. But there were some challenges in this regard; addressing them through inter-sectoral collaboration is one of the most important strategies for the development of internationalization of education in the field of medical sciences. PMID:29344529

  8. Internationalization of medical education in Iran: A way towards implementation of the plans of development and innovation in medical education.

    PubMed

    Shamsi Gooshki, Ehsan; Pourabbasi, Ata; Akbari, Hamid; Rezaei, Nima; Arab Kheradmand, Ali; Kheiry, Zahra; Peykari, Niloufar; Momeni Javid, Fatereh; Hajipour, Firouzeh; Larijani, Bagher

    2018-01-01

    Academic institutions are the most important organizations for implementation of internationalization policies and practices for integrating an international, intercultural and global dimension in higher education system. Also, a globally increasing demand for higher education has been seen in the past two decades so that the number of students enrolled in higher education institutions in the worldwide nation-states has increased dramatically. The National Plan of International Development of Medical Education was designed with the aim of identifying available potentials in all the universities of medical sciences, encouraging the development of international standards of medical education, and planning for the utilization of the existing capacity in Islamic republic of Iran. Authors have tried to review the several aspects of international activities in higher education in the world and describe national experiences and main policies in globalization of medical education in Iran within implementation of the National Plan for Development and Innovation in Medical Education. The findings of some global experiences provide the policy makers with clear directions in order to develop internationalization of higher education. The Program for International Development of Medical Education was designed by the Deputy of Education in the Ministry of Health and the effective implementation of this Program was so important for promotion of Iranian medical education. But there were some challenges in this regard; addressing them through inter-sectoral collaboration is one of the most important strategies for the development of internationalization of education in the field of medical sciences.

  9. 76 FR 49303 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Rules Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... design requirements for the monitoring systems. The revised CMS rules also delineate the recordkeeping..., [Insert page number where the document begins]. 7017.1140 CEMS design 03/01/99 08/10/11, [Insert page...]. 7017.1190 COMS design 03/01/99 08/10/11, [Insert page requirements. number where the document begins...

  10. 76 FR 26609 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... that manufacturers would be forced to alter the design or emission control equipment on new nonroad... in practical effect force manufacturers to alter the design or emission control equipment on new... manufacturer or user of a nonroad engine or vehicle to change the emission control design of the engine or...

  11. A Training Manual in Conducting a Workshop in the Design, Construction, Operation, Maintenance and Repair of Hydrams.

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Office of Programming and Training Coordination.

    This manual presents a comprehensive training design, suggested procedures, and materials for conducting a workshop in the design, construction, operation, maintenance, and repair of hydrams, and in the planning and implementation of hydram projects. Hydrams (hydraulic rams, hydraulic ram pumps, automatic hydraulic ram pumps, rams) are devices…

  12. The building blocks of a 'Liveable Neighbourhood': Identifying the key performance indicators for walking of an operational planning policy in Perth, Western Australia.

    PubMed

    Hooper, Paula; Knuiman, Matthew; Foster, Sarah; Giles-Corti, Billie

    2015-11-01

    Planning policy makers are requesting clearer guidance on the key design features required to build neighbourhoods that promote active living. Using a backwards stepwise elimination procedure (logistic regression with generalised estimating equations adjusting for demographic characteristics, self-selection factors, stage of construction and scale of development) this study identified specific design features (n=16) from an operational planning policy ("Liveable Neighbourhoods") that showed the strongest associations with walking behaviours (measured using the Neighbourhood Physical Activity Questionnaire). The interacting effects of design features on walking behaviours were also investigated. The urban design features identified were grouped into the "building blocks of a Liveable Neighbourhood", reflecting the scale, importance and sequencing of the design and implementation phases required to create walkable, pedestrian friendly developments. Copyright © 2015 Elsevier Ltd. All rights reserved.

  13. Integrated Advanced Sounding Unit-A (AMSU-A). Configuration Management Plan

    NASA Technical Reports Server (NTRS)

    Cavanaugh, J.

    1996-01-01

    The purpose of this plan is to identify the baseline to be established during the development life cycle of the integrated AMSU-A, and define the methods and procedures which Aerojet will follow in the implementation of configuration control for each established baseline. Also this plan establishes the Configuration Management process to be used for the deliverable hardware, software, and firmware of the Integrated AMSU-A during development, design, fabrication, test, and delivery.

  14. Marketplace Plans With Narrow Physician Networks Feature Lower Monthly Premiums Than Plans With Larger Networks.

    PubMed

    Polsky, Daniel; Cidav, Zuleyha; Swanson, Ashley

    2016-10-01

    The introduction of health insurance Marketplaces under the Affordable Care Act has been associated with growth of restricted provider networks. The value of this plan design strategy, including its association with lower premiums, is uncertain. We used data from all silver plans offered in the 2014 health insurance exchanges in the fifty states and the District of Columbia to estimate the association between the breadth of a provider network and plan premiums. We found that within a market, for plans of otherwise equivalent design and controlling for issuer-specific pricing strategy, a plan with an extra-small network had a monthly premium that was 6.7 percent less expensive than that of a plan with a large network. Because narrow networks remain an important strategy available to insurance companies to offer lower-cost plans on health insurance Marketplaces, the success of health insurance coverage expansions may be tied to the successful implementation of narrow networks. Project HOPE—The People-to-People Health Foundation, Inc.

  15. Second Year Manual for the Kentucky Appalachia Vocational Staff Exchange Project. Revised.

    ERIC Educational Resources Information Center

    Thomas, Edward G.; White, Patrick E.

    A staff exchange project designed to provide for an exchange of vocational education teachers and administrators with supervisors and technicians from business and industry is presented in this handbook. A step-by-step plan, for use at State, regional, and local levels, is given for initiating, planning, and implementing an exchange project. Six…

  16. T.E.M.P.: Teacher Education Model of Partnership--A Year-Long Competency-Based Urban Elementary Teaching Internship.

    ERIC Educational Resources Information Center

    Concordia Coll., St. Paul, Minn.

    The Teacher Education Model of Partnership (TEMP) features joint ownership, joint support, and a partner relationship between a college and a school district in planning and implementing a professional program, designed specifically for teaching in the urban classroom. A planning committee was formed, composed of representatives from the public…

  17. Adaptive management of forest ecosystems: did some rubber hit the road?

    Treesearch

    B.T. Bormann; R.W. Haynes; J.R. Martin

    2007-01-01

    Although many scientists recommend adaptive management for large forest tracts, there is little evidence that its use has been effective at this scale. One exception is the 10-million-hectare Northwest Forest Plan, which explicitly included adaptive management in its design. Evidence from 10 years of implementing the plan suggests that formalizing adaptive steps and...

  18. Design and Implementation of a Multi-Strategy, Collegewide Program of Evaluation and Planning: The Mercy College Self-Study Project.

    ERIC Educational Resources Information Center

    Kraetzer, Mary C.; And Others

    The rationale, strategies, and methods of The Mercy College Self-Study Project are considered, and evaluation instruments are provided. This program of institutional evaluation and planning was initiated in 1980 and consists of: standardized surveys, a 10-year longitudinal (panel) study, and academic department self-studies. Questionnaires…

  19. District Awards for Teacher Excellence: Research Brief

    ERIC Educational Resources Information Center

    National Center on Performance Incentives, 2010

    2010-01-01

    Since 2008 Texas's District Awards for Teacher Excellence (D.A.T.E.) program has provided grants to districts for the implementation of locally designed incentive pay plans. The 2010-11 school year is the third year of the D.A.T.E. incentive pay plans with approximately $197 million in annual state funding. This research brief summarizes the key…

  20. 78 FR 71504 - Approval and Promulgation of Air Quality Implementation Plans; New Hampshire; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... of the SIP. Conformity currently applies to areas that are designated nonattainment, and those redesignated to attainment after 1990 (maintenance areas) with plans developed under section 175A of the Clean... SIPs are found in 40 CFR 51.390. B. What is General Conformity? General Conformity is a requirement of...

  1. 40 CFR 51.902 - Which classification and nonattainment area planning provisions of the CAA shall apply to areas...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... area planning provisions of the CAA shall apply to areas designated nonattainment for the 8-hour NAAQS? 51.902 Section 51.902 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of 8-hour Ozone National Ambient Air Quality Standard § 51.902 Which classification and...

  2. 40 CFR 51.902 - Which classification and nonattainment area planning provisions of the CAA shall apply to areas...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... area planning provisions of the CAA shall apply to areas designated nonattainment for the 1997 8-hour NAAQS? 51.902 Section 51.902 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of 8-hour Ozone National Ambient Air Quality Standard § 51.902 Which classification and...

  3. 40 CFR 51.902 - Which classification and nonattainment area planning provisions of the CAA shall apply to areas...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... area planning provisions of the CAA shall apply to areas designated nonattainment for the 1997 8-hour NAAQS? 51.902 Section 51.902 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of 8-hour Ozone National Ambient Air Quality Standard § 51.902 Which classification and...

  4. 40 CFR 51.902 - Which classification and nonattainment area planning provisions of the CAA shall apply to areas...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... area planning provisions of the CAA shall apply to areas designated nonattainment for the 1997 8-hour NAAQS? 51.902 Section 51.902 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of 8-hour Ozone National Ambient Air Quality Standard § 51.902 Which classification and...

  5. 40 CFR 51.902 - Which classification and nonattainment area planning provisions of the CAA shall apply to areas...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... area planning provisions of the CAA shall apply to areas designated nonattainment for the 8-hour NAAQS? 51.902 Section 51.902 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of 8-hour Ozone National Ambient Air Quality Standard § 51.902 Which classification and...

  6. District Computer Concerns: Checklist for Monitoring Instructional Use of Computers.

    ERIC Educational Resources Information Center

    Coe, Merilyn

    Designed to assist those involved with planning, organizing, and implementing computer use in schools, this checklist can be applied to: (1) assess the present state of instructional computer use in the district; (2) assist with the development of plans or guidelines for computer use; (3) support a start-up phase; and (4) monitor the…

  7. Integrated STEM Curriculum: Improving Educational Outcomes for Head Start Children

    ERIC Educational Resources Information Center

    Aldemir, Jale; Kermani, Hengameh

    2017-01-01

    In this study, the researchers aimed to design, plan and implement a Science, Technology, Engineering and Math (STEM) model to support Pre-K children's skills and knowledge in STEM as well as to improve Pre-K teachers' attitudes and professional skills to plan and integrate STEM concepts in their daily classroom activities. Four classrooms from a…

  8. 75 FR 12090 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... Ozone Standard in Lake and Porter Counties? 4. What Is the Contingency Plan for Lake and Porter Counties... your concerns, and suggest alternatives. 7. Explain your views as clearly as possible, avoiding the use... CAA as contingencies for areas not making Reasonable Further Progress (RFP) toward attainment of the...

  9. 78 FR 37 - Approval and Promulgation of Air Quality Implementation Plans; Utah; Maintenance Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ... listed in the FOR FURTHER INFORMATION CONTACT section to view the hard copy of the docket. You may view... to illustrate your concerns, and suggest alternatives. g. Explain your views as clearly as possible... years following designation--i.e., until 2014--and must include contingency measures. In May 20, 2005...

  10. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  11. Sustainable urban development in Brisbane City--the Holy Grail?

    PubMed

    Rahman, K; Weber, T

    2003-01-01

    Impacts from urban stormwater runoff on receiving environments have been well documented, particularly through specific regional scientific studies. Using various local government planning and management elements, urban developments in Brisbane City are now able to address stormwater management in an increasingly holistic context. One key initiative includes facilitating Water Sensitive Urban Design (WSUD) components within an Integrated Water Management Strategy that looks at policy formation, planning strategies, design option, community marketing and acceptance, maintenance programs and finally evaluation of various WSUD approaches. These can include the use of Natural Channel Designs, grassed swales, bio-filtration systems, porous pavements and roofwater tanks in several economic combinations. By linking with the Cooperative Research Centre for Catchment Hydrology, Brisbane City Council has influenced the design of WSUD planning tools and benefited the city with academic inputs into extensive evaluation programs. As well, it has also contributed to the Cooperative Research Centre's research outcomes. These evaluation programs are increasingly providing better understanding of various stormwater quality best management practices throughout Australia. As part of the overall implementation process, active involvement by a range of stakeholders has been crucial. These stakeholders have included internal planning, development assessment and design staff, external consultants, developers, and other local and state government agencies. The latter two groups are assisting in the important task of "regionalisation" of Brisbane City Council's policies and guidelines. Implementation of WSUD initiatives and stormwater re-use strategies under Council's new "Integrated Water Management" agenda are showing some excellent results, suggesting that sustainable urban development is no longer like the search for the Holy Grail.

  12. Laboratory characterization of materials & data management for Ohio-SHRP Projects (U.S. 23) : research implementation plan.

    DOT National Transportation Integrated Search

    2006-02-01

    Highway design engineers in the U.S. have been relying on the 1986-1993 American Association of State Highway : and Transportation Officials (AASHTO) Design Guide, which is based on the many empirical elements obtained in : the 40-year old AASTHO Roa...

  13. Designing a Decision-Support System for Enrollment Management. AIR 1985 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Glover, Robert H.

    University of Hartford's decision-support system for enrollment management, which uses fourth-generation software tools, is described, with attention to the conceptual framework, design and implementation plan, and progress to date. The university's planners, institutional researchers, and admissions and financial aid officers are cooperating in…

  14. Designing an Amusement Park Ride

    ERIC Educational Resources Information Center

    Kurz, Terri L.; Robles, Rolando

    2016-01-01

    To improve access to STEM curriculum, an activity was planned that presents the opportunity to design and build using gears and other tools. In this challenge, preservice elementary school teachers were asked to mathematically analyze gears and create an amusement park ride that uses gears to spin. Although this lesson was implemented with…

  15. Idea Bank: Individualized Assessment in the Choral Ensemble

    ERIC Educational Resources Information Center

    Furby, Victoria J.

    2013-01-01

    Choral directors will always be assessed by the quality of their choral performances. The concepts presented in this article are designed to strengthen and improve choral performance. If choral directors can design an individualized assessment plan and implement some of these ideas during each grading period, grades will be more equitably…

  16. 42 CFR 483.440 - Condition of participation: Active treatment services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CARE FACILITIES Conditions of Participation for Intermediate Care Facilities for Individuals with... assessments required in paragraph (c)(3) of this section; and (ii) Designing programs that meet the client's... designed to implement the objectives in the individual program plan must specify: (i) The methods to be...

  17. 42 CFR 483.440 - Condition of participation: Active treatment services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CARE FACILITIES Conditions of Participation for Intermediate Care Facilities for Individuals with... assessments required in paragraph (c)(3) of this section; and (ii) Designing programs that meet the client's... designed to implement the objectives in the individual program plan must specify: (i) The methods to be...

  18. 42 CFR 483.440 - Condition of participation: Active treatment services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CARE FACILITIES Conditions of Participation for Intermediate Care Facilities for Individuals with... assessments required in paragraph (c)(3) of this section; and (ii) Designing programs that meet the client's... designed to implement the objectives in the individual program plan must specify: (i) The methods to be...

  19. 76 FR 34246 - Automated Commercial Environment (ACE); Announcement of National Customs Automation Program Test...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-13

    ... CBP with authority to conduct limited test programs or procedures designed to evaluate planned... aspects of this test, including the design, conduct and implementation of the test, in order to determine... Environment (ACE); Announcement of National Customs Automation Program Test of Automated Procedures for In...

  20. Neuroeducational Research in the Design and Use of a Learning Technology

    ERIC Educational Resources Information Center

    Howard-Jones, Paul; Holmes, Wayne; Demetriou, Skevi; Jones, Carol; Tanimoto, Eriko; Morgan, Owen; Perkins, David; Davies, Neil

    2015-01-01

    Many have warned against a direct "brain scan to lesson plan" approach when attempting to transfer insights from neuroscience to the classroom. Similarly, in the effective design and implementation of learning technology, a judicious interrelation of insights associated with diverse theoretical perspectives (e.g., neuroscientific,…

  1. IMPlementation of A Relatives' Toolkit (IMPART study): an iterative case study to identify key factors impacting on the implementation of a web-based supported self-management intervention for relatives of people with psychosis or bipolar experiences in a National Health Service: a study protocol.

    PubMed

    Lobban, Fiona; Appleton, Victoria; Appelbe, Duncan; Barraclough, Johanna; Bowland, Julie; Fisher, Naomi R; Foster, Sheena; Johnson, Sonia; Lewis, Elizabeth; Mateus, Céu; Mezes, Barbara; Murray, Elizabeth; O'Hanlon, Puffin; Pinfold, Vanessa; Rycroft-Malone, Jo; Siddle, Ron; Smith, Jo; Sutton, Chris J; Walker, Andrew; Jones, Steven H

    2017-12-28

    Web-based interventions to support people to manage long-term health conditions are available and effective but rarely used in clinical services. The aim of this study is to identify critical factors impacting on the implementation of an online supported self-management intervention for relatives of people with recent onset psychosis or bipolar disorder into routine clinical care and to use this information to inform an implementation plan to facilitate widespread use and inform wider implementation of digital health interventions. A multiple case study design within six early intervention in psychosis (EIP) services in England, will be used to test and refine theory-driven hypotheses about factors impacting on implementation of the Relatives' Education And Coping Toolkit (REACT). Qualitative data including behavioural observation, document analysis, and in-depth interviews collected in the first two EIP services (wave 1) and analysed using framework analysis, combined with quantitative data describing levels of use by staff and relatives and impact on relatives' distress and wellbeing, will be used to identify factors impacting on implementation. Consultation via stakeholder workshops with staff and relatives and co-facilitated by relatives in the research team will inform development of an implementation plan to address these factors, which will be evaluated and refined in the four subsequent EIP services in waves 2 and 3. Transferability of the implementation plan to non-participating services will be explored. Observation of implementation in a real world clinical setting, across carefully sampled services, in real time provides a unique opportunity to understand factors impacting on implementation likely to be generalizable to other web-based interventions, as well as informing further development of implementation theories. However, there are inherent challenges in investigating implementation without influencing the process under observation. We outline our strategies to ensure our design is transparent, flexible, and responsive to the timescales and activities happening within each service whilst also meeting the aims of the project. ISCTRN 16267685 (09/03/2016).

  2. So you want to share your science…. Connecting to the world of informal science learning.

    PubMed

    Alpert, Carol Lynn

    2018-04-25

    Scientists can reap personal rewards through collaborations with science and natural history museums, zoos, botanical gardens, aquaria, parks, and nature preserves, and, while doing so, help to advance science literacy and broaden participation in the natural sciences. Beyond volunteer opportunities, which allow scientists to contribute their knowledge and passion within the context of existing programs and activities, there are also opportunities for scientists to bring their knowledge and resources to the design and implementation of new learning experiences for visitors to these informal science learning organizations (ISLOs). Well-designed education outreach plans that leverage the expertise and broad audiences of ISLOs can also enhance the prospects of research grant proposals made to agencies such as National Science Foundation, which encourage researchers to pay careful attention to the broader impacts of their research as well as its intellectual merit. Few scientists, however, have had the opportunity to become familiar with the pedagogy and design of informal or 'free-choice' science learning, and fewer still know how to go about the process of collaborating with ISLO's in developing and implementing effective programs, exhibits, and other learning experiences. This article, written by an experienced science museum professional, provides guidance for individual scientists and research groups interested in pursuing effective education outreach collaborations with science museums and other ISLOs. When prospective partners begin discussions early in the proposal development process, they increase the likelihood of successful outcomes in funding, implementation, and impact. A strategic planning worksheet is provided, along with a carefully-selected set of further resources to guide the design and planning of informal science learning experiences.

  3. On the role of model-based monitoring for adaptive planning under uncertainty

    NASA Astrophysics Data System (ADS)

    Raso, Luciano; Kwakkel, Jan; Timmermans, Jos; Haasnoot, Mariolijn

    2016-04-01

    Adaptive plans, designed to anticipate and respond to an unfolding uncertain future, have found a fertile application domain in the planning of deltas that are exposed to rapid socioeconomic development and climate change. Adaptive planning, under the moniker of adaptive delta management, is used in the Dutch Delta Program for developing a nation-wide plan to prepare for uncertain climate change and socio-economic developments. Scientifically, adaptive delta management relies heavily on Dynamic Adaptive Policy Pathways. Currently, in the Netherlands the focus is shifting towards implementing the adaptive delta plan. This shift is especially relevant because the efficacy of adaptive plans hinges on monitoring on-going developments and ensuring that actions are indeed taken if and when necessary. In the design of an effective monitoring system for an adaptive plan, three challenges have to be confronted: • Shadow of the past: The development of adaptive plans and the design of their monitoring system relies heavily on current knowledge of the system, and current beliefs about plausible future developments. A static monitoring system is therefore exposed to the exact same uncertainties one tries to address through adaptive planning. • Inhibition of learning: Recent applications of adaptive planning tend to overlook the importance of learning and new information, and fail to account for this explicitly in the design of adaptive plans. • Challenge of surprise: Adaptive policies are designed in light of the current foreseen uncertainties. However, developments that are not considered during the design phase as being plausible could still substantially affect the performance of adaptive policies. The shadow of the past, the inhibition of learning, and the challenge of surprise taken together suggest that there is a need for redesigning the concepts of monitoring and evaluation to support the implementation of adaptive plans. Innovations from control theory, triggered by the challenge of uncertainty in operational control, may offer solutions from which monitoring for adaptive planning can benefit. Specifically: (i) in control, observations are incorporated into the model through data assimilation, updating the present state, boundary conditions, and parameters based on new observations, diminishing the shadow of the past; (ii) adaptive control is a way to modify the characteristics of the internal model, incorporating new knowledge on the system, countervailing the inhibition of learning; and (iii) in closed-loop control, a continuous system update equips the controller with "inherent robustness", i.e. to capacity to adapts to new conditions even when these were not initially considered. We aim to explore how inherent robustness addresses the challenge of surprise. Innovations in model-based control might help to improve and adapt the models used to support adaptive delta management to new information (reducing uncertainty). Moreover, this would offer a starting point for using these models not only in the design of adaptive plans, but also as part of the monitoring. The proposed research requires multidisciplinary cooperation between control theory, the policy sciences, and integrated assessment modeling.

  4. Intensive Evaluation of Head Start Implementation in the Tucson Early Education Model.

    ERIC Educational Resources Information Center

    Rentfrow, Robert K.

    As part of the national Head Start Planned Variation Study, this study used a relatively small sample in an intensive evaluation of program implementation in one field community using the Tucson Early Education Model (TEEM). A modified Solomon four-group research design formed the organization framework. Evaluation of six TEEM classrooms and two…

  5. Using e-Coaching to Support an Early Intervention Provider's Implementation of a Functional Assessment-Based Intervention

    ERIC Educational Resources Information Center

    Fettig, Angel; Barton, Erin E.; Carter, Alice S.; Eisenhower, Abbey S.

    2016-01-01

    This study examined the effects of e-coaching on the implementation of a functional assessment-based intervention delivered by an early intervention provider in reducing challenging behaviors during home visits. A multiple baseline design across behavior support plan components was used with a provider-child dyad. The e-coaching intervention…

  6. Three-Tiered Models of Prevention: Teacher Efficacy and Burnout

    ERIC Educational Resources Information Center

    Oakes, Wendy Peia; Lane, Kathleen Lynne; Jenkins, Abbie; Booker, Belle B.

    2013-01-01

    Project Persevere examined teacher efficacy and burnout within Comprehensive, Integrated, Three-tiered (CI3T) models of prevention, as implemented in two middle schools in a southern state. Participating schools completed a year-long training series to design their CI3T plans and were in their first year of implementation as part of regular school…

  7. A Preventive Intervention Program for Urban African American Youth Attending an Alternative Education Program: Background, Implementation, and Feasibility

    ERIC Educational Resources Information Center

    Carswell, Steven B.; Hanlon, Thomas E.; O'Grady, Kevin E.; Watts, Amy M.; Pothong, Pattarapan

    2009-01-01

    This paper presents background, implementation, and feasibility findings associated with planning and conducting an after-school intervention program in an alternative education setting designed to prevent the initiation and escalation of violence and substance abuse among urban African American youth at high risk for life-long problem behaviors.…

  8. The TESSA OER Experience: Building Sustainable Models of Production and User Implementation

    ERIC Educational Resources Information Center

    Wolfenden, Freda

    2008-01-01

    This paper offers a review of the origins, design strategy and implementation plans of the Teacher Education in Sub-Saharan Africa (TESSA) research and development programme. The programme is working to develop new models of teacher education, particularly school based training, including the creation of a programme webspace and an extensive bank…

  9. Designing and Implementing Two-Way Bilingual Programs: A Step-by-Step Guide for Administrators, Teachers, and Parents.

    ERIC Educational Resources Information Center

    Calderon, Margarita Espino; Minaya-Rowe, Liliana

    This book provides school administrators, teachers, and parents with the basic knowledge necessary for planning and implementing effective two-way bilingual programs. It offers essential elements to help students gain literacy in two languages, increase cross-cultural understanding, and meet high levels of achievement in all core academic areas.…

  10. From FBA to Implementation: A Look at What Is Actually Being Delivered

    ERIC Educational Resources Information Center

    Blood, Erika; Neel, Richard S.

    2007-01-01

    This study looks at the utilization of assessments on developing behavior intervention plans (BIPs) and their use in designing actual implementation for the children (elementary through high school) labeled EBD in a mid-sized district in eastern Washington. Files were reviewed to determine the types of assessments used, FBA components addressed,…

  11. Planning and Implementing Career Education for the Special Student, with Emphasis on the Leisure Occupations.

    ERIC Educational Resources Information Center

    Vinton, Dennis A.; And Others

    A program of career education for exceptional students in the leisure occupations is described. It is explained that the book is designed for regular and special class teachers. Chapters one and two present information on career education principles and implementation. Chapters three through five deal with practical teaching concerns. Behavioral…

  12. RE-PLAN: An Extensible Software Architecture to Facilitate Disaster Response Planning

    PubMed Central

    O’Neill, Martin; Mikler, Armin R.; Indrakanti, Saratchandra; Tiwari, Chetan; Jimenez, Tamara

    2014-01-01

    Computational tools are needed to make data-driven disaster mitigation planning accessible to planners and policymakers without the need for programming or GIS expertise. To address this problem, we have created modules to facilitate quantitative analyses pertinent to a variety of different disaster scenarios. These modules, which comprise the REsponse PLan ANalyzer (RE-PLAN) framework, may be used to create tools for specific disaster scenarios that allow planners to harness large amounts of disparate data and execute computational models through a point-and-click interface. Bio-E, a user-friendly tool built using this framework, was designed to develop and analyze the feasibility of ad hoc clinics for treating populations following a biological emergency event. In this article, the design and implementation of the RE-PLAN framework are described, and the functionality of the modules used in the Bio-E biological emergency mitigation tool are demonstrated. PMID:25419503

  13. Social marketing: an approach to planned social change.

    PubMed

    Kotler, P; Zaltman, G

    1971-07-01

    This article examines the applicability of marketing concepts to social causes and social change. Social marketing is defined as the design, implementation, and control of programs calculated to influence the acceptability of social ideas and involving considerations of product planning, pricing, communication, distribution and marketing research. Wiebe examined four social advertising campaigns and concluded that their effectiveness depended on the presence of adequate force, direction, adequate and compatible social mechanism, and distance (the "cost" of the new attitude as seen by message's message"s recepient). A marketing planning approach is not a guarantee for the achievement of social objectives; yet, it represents a bridging mechanism linking the knowledge of the behavioral scientist with the socially useful implementation of that knowledge.

  14. Analysis and preliminary design of Kunming land use and planning management information system

    NASA Astrophysics Data System (ADS)

    Li, Li; Chen, Zhenjie

    2007-06-01

    This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.

  15. Plan for the Characterization of HIRF Effects on a Fault-Tolerant Computer Communication System

    NASA Technical Reports Server (NTRS)

    Torres-Pomales, Wilfredo; Malekpour, Mahyar R.; Miner, Paul S.; Koppen, Sandra V.

    2008-01-01

    This report presents the plan for the characterization of the effects of high intensity radiated fields on a prototype implementation of a fault-tolerant data communication system. Various configurations of the communication system will be tested. The prototype system is implemented using off-the-shelf devices. The system will be tested in a closed-loop configuration with extensive real-time monitoring. This test is intended to generate data suitable for the design of avionics health management systems, as well as redundancy management mechanisms and policies for robust distributed processing architectures.

  16. Advanced imaging programs: maximizing a multislice CT investment.

    PubMed

    Falk, Robert

    2008-01-01

    Advanced image processing has moved from a luxury to a necessity in the practice of medicine. A hospital's adoption of sophisticated 3D imaging entails several important steps with many factors to consider in order to be successful. Like any new hospital program, 3D post-processing should be introduced through a strategic planning process that includes administrators, physicians, and technologists to design, implement, and market a program that is scalable-one that minimizes up front costs while providing top level service. This article outlines the steps for planning, implementation, and growth of an advanced imaging program.

  17. 78 FR 69812 - Approval and Promulgation of Implementation Plans; Texas; Control of Air Pollution by Permits for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ...EPA is proposing to approve portions of two revisions to the Texas State Implementation Plan (SIP) concerning the Permits for Specific Designated Facilities Program, also referred to as the FutureGen Program. EPA has determined that the portions of these SIP revisions specific to the FutureGen Program submitted on March 9, 2006 and July 2, 2010, comply with the Clean Air Act and EPA regulations and are consistent with EPA policies. This action is being taken under section 110 and parts C and D of the Act.

  18. Planning, Implementation and Optimization of Future space Missions using an Immersive Visualization Environement (IVE) Machine

    NASA Astrophysics Data System (ADS)

    Harris, E.

    Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars Reconnaissance Orbiter and Lunar Base construction scenarios. Innovative solutions utilizing Immersive Visualization provide the key to streamlining the mission planning and optimizing engineering design phases of future aerospace missions.

  19. Productivity Measurement and Analysis of Airborne Weapons Maintenance Plans Performed by the Weapons Support Directorate, Pacific Missile Test Center, Pt. Mugu.

    DTIC Science & Technology

    1987-12-01

    FM__KWJW~j’JVx W-V WWv Wu M WV b7’ II. LIT’rIEK REVI, AND TD .ORZTICAL F MW A. WHAT IS PRODUCTIVITY? 1. Productivity Definod The definition of...Implementing the Manpower Budget And Workgd Forecasting System The implementation of the system designed in Step 9. Step 12 - Implement ihQ inaAn MtpQx

  20. Incorporating bioenergy into sustainable landscape designs

    DOE PAGES

    Dale, Virginia H.; Kline, Keith L.; Buford, Marilyn A.; ...

    2015-12-30

    In this paper, we describe an approach to landscape design that focuses on integrating bioenergy production with other components of environmental, social and economic systems. Landscape design as used here refers to a spatially explicit, collaborative plan for management of landscapes and supply chains. Landscape design can involve multiple scales and build on existing practices to reduce costs or enhance services. Appropriately applied to a specific context, landscape design can help people assess trade-offs when making choices about locations, types of feedstock, transport, refining and distribution of bioenergy products and services. The approach includes performance monitoring and reporting along themore » bioenergy supply chain. Examples of landscape design applied to bioenergy production systems are presented. Barriers to implementation of landscape design include high costs, the need to consider diverse land-management objectives from a wide array of stakeholders, up-front planning requirements, and the complexity and level of effort needed for successful stakeholder involvement. A landscape design process may be stymied by insufficient data or participation. An impetus for coordination is critical, and incentives may be required to engage landowners and the private sector. In conclusion, devising and implementing landscape designs for more sustainable outcomes require clear communication of environmental, social, and economic opportunities and concerns.« less

Top