7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
7 CFR 1717.604 - Long-range engineering plans and construction work plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...
58. Photographic copy of original construction plan (St. Paul Engineer's ...
58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
This photographic copy of an engineering drawing shows floor plans, ...
This photographic copy of an engineering drawing shows floor plans, sections and elevations of Building E-86, with details typical of the steel frame and "Transite" building construction at JPL Edwards Facility. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office: "Casting & Curing, Building E-86, Floor Plan, Elevations & Section," drawing no. E86/6, 25 February 1977. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Casting & Curing Building, Edwards Air Force Base, Boron, Kern County, CA
46 CFR 189.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...
46 CFR 189.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) OCEANOGRAPHIC RESEARCH VESSELS INSPECTION AND CERTIFICATION Plan Approval § 189.55-5 Plans and specifications..., carbon dioxide, foam and sprinkling systems. (e) Marine engineering. For plans required for marine engineering equipment and systems. See Subchapter F (Marine Engineering) of this chapter. (f) Electrical...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range engineering plans identify plant investments required over a period of 10 years or more. CWPs specify and...
46 CFR 110.25-1 - Plans and information required for new construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Plans and information required for new construction. 110.25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction...
46 CFR 110.25-1 - Plans and information required for new construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Plans and information required for new construction. 110.25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction...
46 CFR 71.65-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... dioxide, foam, and sprinkling systems. (7) Supervised Patrol Route. (e) Marine engineering. (1) For plans required for marine engineering equipment and systems, see subchapter F (Marine Engineering) of this... equipment and systems, see subchapter J (Electrical Engineering) of this chapter. (2) [Reserved] (g...
Code of Federal Regulations, 2010 CFR
2010-01-01
.... (i) A borrower's CWP or special engineering studies must be supported by a Borrower's Environmental..., and retirements. The primary components of the system consist of long-range engineering plans, construction work plans (CWPs), CWP amendments, and special engineering and cost studies. Long range...
46 CFR 91.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... systems. (e) Marine engineering. For plans required for marine engineering equipment and systems, see... electrical engineering, equipment and systems, see subchapter J (Electrical Engineering) of this chapter. (g... bottoms, etc., and including inboard and outboard profile. (b) Hull structure. 1 (1) *Inner Bottom Plating...
CasCADe: A Novel 4D Visualization System for Virtual Construction Planning.
Ivson, Paulo; Nascimento, Daniel; Celes, Waldemar; Barbosa, Simone Dj
2018-01-01
Building Information Modeling (BIM) provides an integrated 3D environment to manage large-scale engineering projects. The Architecture, Engineering and Construction (AEC) industry explores 4D visualizations over these datasets for virtual construction planning. However, existing solutions lack adequate visual mechanisms to inspect the underlying schedule and make inconsistencies readily apparent. The goal of this paper is to apply best practices of information visualization to improve 4D analysis of construction plans. We first present a review of previous work that identifies common use cases and limitations. We then consulted with AEC professionals to specify the main design requirements for such applications. These guided the development of CasCADe, a novel 4D visualization system where task sequencing and spatio-temporal simultaneity are immediately apparent. This unique framework enables the combination of diverse analytical features to create an information-rich analysis environment. We also describe how engineering collaborators used CasCADe to review the real-world construction plans of an Oil & Gas process plant. The system made evident schedule uncertainties, identified work-space conflicts and helped analyze other constructability issues. The results and contributions of this paper suggest new avenues for future research in information visualization for the AEC industry.
48 CFR 936.202-70 - Specifications charges.
Code of Federal Regulations, 2011 CFR
2011-10-01
... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...
48 CFR 936.202-70 - Specifications charges.
Code of Federal Regulations, 2012 CFR
2012-10-01
... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...
48 CFR 936.202-70 - Specifications charges.
Code of Federal Regulations, 2013 CFR
2013-10-01
... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...
48 CFR 936.202-70 - Specifications charges.
Code of Federal Regulations, 2014 CFR
2014-10-01
... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...
48 CFR 936.202-70 - Specifications charges.
Code of Federal Regulations, 2010 CFR
2010-10-01
... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...
6. Photographic copy of original construction drawing, FOUNDATION PLAN, SECTIONS ...
6. Photographic copy of original construction drawing, FOUNDATION PLAN, SECTIONS AND GENERAL NOTED, SHEET 6 OF 11, DRAWING NO. 35-03-05 SF 5/1673, U.S. Army Engineer District, Detroit, Corps of Engineers, 9 June, 1959, on file Selfridge Base Museum. - Selfridge Field, Building No. 1041, West of E Street, north of D Street, Mount Clemens, Macomb County, MI
Code of Federal Regulations, 2010 CFR
2010-04-01
... UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.122 What does an... information available about the construction project, including construction drawings, maps, engineering... tribal organization to review all plans, specifications, engineering reports, cost estimates, and other...
29 CFR 1926.705 - Requirements for lift-slab construction operations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...
29 CFR 1926.705 - Requirements for lift-slab construction operations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...
29 CFR 1926.705 - Requirements for lift-slab construction operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...
29 CFR 1926.705 - Requirements for lift-slab construction operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...
29 CFR 1926.705 - Requirements for lift-slab construction operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...
Construction. A Report on the Industry
2004-06-01
Transportation and Tres Urbano Subway Project, San Juan, Puerto Rico U.S. Corps of Engineers, San Juan, Puerto Rico U.S. Corps of Engineers, Mobile...recently approved a plan to privatize construction of over 6,000 miles of expressways through the use of a build, transfer, and operate options.xl...security standards in Federal facilities, including an aggressive plan to build and renovate embassies and consular offices worldwide.xlv The
46 CFR 110.25-1 - Plans and information required for new construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
....25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction... available at the point of application. (b) Electrical plant load analysis including connected loads and...
46 CFR 110.25-1 - Plans and information required for new construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
....25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction... available at the point of application. (b) Electrical plant load analysis including connected loads and...
Construction Management: Planning Ahead.
ERIC Educational Resources Information Center
Arsht, Steven
2003-01-01
Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…
PLANS & ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard. Also ...
PLANS & ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard. Also includes door schedule and a small scale plot plan. No architect noted. Drawn by W.H.H. Plan no. 2-N-5 (U.E. Co. plan no. 10,523). Scale 1/8 inch to the foot. March 10, 1942, last revised 10/6/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76, item no. 22A. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Warehouse, 2900 Main Street, Alameda, Alameda County, CA
SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda ...
SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. Second floor plan, and roof plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. A2 of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/22/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA
ERIC Educational Resources Information Center
English, Lyn D.; King, Donna; Smeed, Joanna
2017-01-01
As part of a 3-year longitudinal study, 136 sixth-grade students completed an engineering-based problem on earthquakes involving integrated STEM learning. Students employed engineering design processes and STEM disciplinary knowledge to plan, sketch, then construct a building designed to withstand earthquake damage, taking into account a number of…
Code of Federal Regulations, 2010 CFR
2010-01-01
... accept the certification only for matters within the staff engineer's area of specialization. In such... certification coordinator. (b) Certification borrowers, shall submit and obtain RUS approval of a work plan before construction and related engineering begin. (1) The work plan shall provide a description of the...
Solar power satellite system definition study, phase 2.
NASA Technical Reports Server (NTRS)
1979-01-01
A program plan for the Solar Power Satellite Program is presented. The plan includes research, development, and evaluation phase, engineering and development and cost verification phase, prototype construction, and commercialization. Cost estimates and task requirements are given for the following technology areas: (1) solar arrays; (2) thermal engines and thermal systems; (3) power transmission (to earth); (4) large space structures; (5) materials technology; (6) system control; (7) space construction; (8) space transportation; (9) power distribution, and space environment effects.
NEARING THE END OF CONSTRUCTION ON THE LOX TEST STAND AT MSFC.
2015-01-08
AS THE END OF CONSTRUCTION ON TEST STAND 4697, THE LIQUID OXYGEN TANK TEST STAND AT MARSHALL SPACE FLIGHT CENTER, PROJECT ENGINEERS PHIL HENDRIX, FROM MSFC, AND CURTNEY WALTERS FROM THE U.S. CORP OF ENGINEERS, STUDY PLANS AND PROGRESS.
23 CFR 660.117 - Funding, records and accounting.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS... be required. (b) Funds for FHs may be used for: (1) Planning; (2) Federal Lands Highway research; (3) Preliminary and construction engineering; and (4) Construction. (c) Funds for FHs may be made available for...
ERIC Educational Resources Information Center
Cowin, Roy; Reyes-Guerra, David
1977-01-01
Engineers may be involved in various functions such as research, development, planning, design (analysis and synthesis), construction, operation and management of engineering projects. This article discusses some branches of accredited engineering curricula, employment opportunities, the preparation for management, minimum education needed, women…
5. Photographic copy of engineering drawing showing plans, elevation and ...
5. Photographic copy of engineering drawing showing plans, elevation and section of Deluge Water System, including reservior (4316), Pump House (4317), and water tower. Job No. Muroc A(5-ll), Military Construction, San Bernardino-Mojave Area, San Bernardino, California: Muroc Bombing Range, Muroc Lake, California.; Additional Facilities for Materiel Center Flight Test Base, Water Supply System, Plans and Sections, Sheet 5 of 10, May 1943. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, Deluge Water Pumping Station, Near Second & D Streets, Boron, Kern County, CA
NASA Astrophysics Data System (ADS)
Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy
2018-03-01
This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.
14. Photographic copy of sepia of original construction drawing dated ...
14. Photographic copy of sepia of original construction drawing dated September 15, 1938 (Original sepia in plan room of Base Civil Engineer, Scott AFB) First and second floor plans - Scott Air Force Base, General Officer Quarters, 229 Birchard Street, O'Fallon, St. Clair County, IL
Code of Federal Regulations, 2014 CFR
2014-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS VALUE ENGINEERING... construction. Value Engineering (VE) analysis. The systematic process of reviewing and assessing a project by a...; and (3) Reducing the time to develop and deliver the project. Value Engineering (VE) Job Plan. A...
Code of Federal Regulations, 2013 CFR
2013-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS VALUE ENGINEERING... construction. Value Engineering (VE) analysis. The systematic process of reviewing and assessing a project by a...; and (3) Reducing the time to develop and deliver the project. Value Engineering (VE) Job Plan. A...
Impact of Transportation on the Environment and Quality of Life.
ERIC Educational Resources Information Center
Schuster, James J.
This paper discusses the changing role of civil engineers in developed nations. Transportation facilities generally follow a four phase approach before construction: long range systems planning, corridor location study, design location study, and final preparation of plans. Traditional engineering education emphasized the latter two phases but now…
Computer aided system engineering for space construction
NASA Technical Reports Server (NTRS)
Racheli, Ugo
1989-01-01
This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yan Di; Liang Jian
Purpose: To construct expected treatment dose for adaptive inverse planning optimization, and evaluate it on head and neck (h and n) cancer adaptive treatment modification. Methods: Adaptive inverse planning engine was developed and integrated in our in-house adaptive treatment control system. The adaptive inverse planning engine includes an expected treatment dose constructed using the daily cone beam (CB) CT images in its objective and constrains. Feasibility of the adaptive inverse planning optimization was evaluated retrospectively using daily CBCT images obtained from the image guided IMRT treatment of 19 h and n cancer patients. Adaptive treatment modification strategies with respect tomore » the time and the number of adaptive inverse planning optimization during the treatment course were evaluated using the cumulative treatment dose in organs of interest constructed using all daily CBCT images. Results: Expected treatment dose was constructed to include both the delivered dose, to date, and the estimated dose for the remaining treatment during the adaptive treatment course. It was used in treatment evaluation, as well as in constructing the objective and constraints for adaptive inverse planning optimization. The optimization engine is feasible to perform planning optimization based on preassigned treatment modification schedule. Compared to the conventional IMRT, the adaptive treatment for h and n cancer illustrated clear dose-volume improvement for all critical normal organs. The dose-volume reductions of right and left parotid glands, spine cord, brain stem and mandible were (17 {+-} 6)%, (14 {+-} 6)%, (11 {+-} 6)%, (12 {+-} 8)%, and (5 {+-} 3)% respectively with the single adaptive modification performed after the second treatment week; (24 {+-} 6)%, (22 {+-} 8)%, (21 {+-} 5)%, (19 {+-} 8)%, and (10 {+-} 6)% with three weekly modifications; and (28 {+-} 5)%, (25 {+-} 9)%, (26 {+-} 5)%, (24 {+-} 8)%, and (15 {+-} 9)% with five weekly modifications. Conclusions: Adaptive treatment modification can be implemented including the expected treatment dose in the adaptive inverse planning optimization. The retrospective evaluation results demonstrate that utilizing the weekly adaptive inverse planning optimization, the dose distribution of h and n cancer treatment can be largely improved.« less
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
23. BUILDING NO. 22L, SHEET NO. 3. United Engineering Company ...
23. BUILDING NO. 22L, SHEET NO. 3. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities. Plans, section, & detail. Alben Froberg, Architect, 3454 Harlan Street, Oakland, California. Sheet no. 3. Plan no. 10,525. Various scales. March 1, 1943, last revised 3/15/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Engineering Building, 2900 Main Street, Alameda, Alameda County, CA
22. BUILDING NO. 22L, SHEET NO. 2. United Engineering Company ...
22. BUILDING NO. 22L, SHEET NO. 2. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities. Plans, section, & detail. Alben Froberg, Architect, 3454 Harlan Street, Oakland, California. Sheet no. 2. Plan no. 10,525. Various scales. March 1, 1942, last revised 3/15/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Engineering Building, 2900 Main Street, Alameda, Alameda County, CA
FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda ...
FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. First floor plan, door transom schedule, interior finish schedule, sash schedule, exterior color schedule, and location plot plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. Al of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/25/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA
Photocopy of drawing (original drawing of Theater886 Seats in possession ...
Photocopy of drawing (original drawing of Theater-886 Seats in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1947 architectural drawings by Department of the Army, Office of the Chief Engineers, Director of Military Construction Engineering Division, Washington, D.C.) FIRST FLOOR PLAN, ROOF PLAN, AND DETAILS - MacDill Air Force Base, Base Theater, 2420 Florida Keys Avenue, Tampa, Hillsborough County, FL
7. This photographic copy of an engineering drawing displays the ...
7. This photographic copy of an engineering drawing displays the building's floor plan in its 1995 arrangement, with rooms designated. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office, "Addition to Weigh & Control Bldg. E-35, Demolition, Floor and Roof Plans," drawing no. E35/3-0, October 5, 1983. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA
1. Photographic copy of architectural plan for Building 4505, Taylor ...
1. Photographic copy of architectural plan for Building 4505, Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. A(9-10), Military Construction: Materiel Command Flight Test Base, Muroc, California, Hangar and Auxiliary Buildings: Hangar Type P-A, Floor Plan & Roof Plan, Sheet No. 16, March 1944. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Hangar, End of North Base Road, Boron, Kern County, CA
47 CFR 5.53 - Station authorization required.
Code of Federal Regulations, 2011 CFR
2011-10-01
... authorization granted by the Commission. However, construction of proposed experimental satellite facilities may... Commission's Office of Engineering and Technology in writing that it plans to begin construction at its own...
47 CFR 5.53 - Station authorization required.
Code of Federal Regulations, 2010 CFR
2010-10-01
... authorization granted by the Commission. However, construction of proposed experimental satellite facilities may... Commission's Office of Engineering and Technology in writing that it plans to begin construction at its own...
Core and Off-Core Processes in Systems Engineering
NASA Technical Reports Server (NTRS)
Breidenthal, Julian; Forsberg, Kevin
2010-01-01
An emerging methodology of organizing systems-engineering plans is based on a concept of core and off-core processes or activities. This concept has emerged as a result of recognition of a risk in the traditional representation of systems-engineering plans by a Vee model alone, according to which a large system is decomposed into levels of smaller subsystems, then integrated through levels of increasing scope until the full system is constructed. Actual systems-engineering activity is more complicated, raising the possibility that the staff will become confused in the absence of plans which explain the nature and ordering of work beyond the traditional Vee model.
Cape Blanco Wind Farm Feasibility Study : Technical Report, No. 2, Civil Engineering.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
1986-09-01
An investigation of the feasibility of developing a wind farm near Cape Blanco, Oregon, requires a plan for civil engineering and preliminary site construction activities. In this report, plans for such activities and related cost estimates are presented for a wind farm using either a Boeing MOD-2 or FloWind 170 wind turbine generator.
43. Portion of Construction Drawing 2042F17, entitled 100 ft. Roundhouse, ...
43. Portion of Construction Drawing 2042-F-17, entitled 100 ft. Roundhouse, Plan and Section of Typical Bay. Shown is a section showing soil bearing foundation and plan. (Original drawing, in the possession of Wyre Dick and Company, Livingston, New Jersey.) - Central Railroad of New Jersey, Engine Terminal, Jersey City, Hudson County, NJ
2016-12-01
Nonfederal Sponsors Why GAO Did This Study Through its Civil Works program, the Corps designs , constructs, and maintains federal water resources...Public Works United States Senate Dear Mr. Chairman: The U.S. Army Corps of Engineers (Corps) is the world’s largest public engineering, design ...its Civil Works Program, in general, the Corps plans, designs , constructs, operates, and maintains a wide range of water resources projects. Congress
MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints
2001-08-01
progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New
7 CFR 1710.205 - Minimum approval requirements for all load forecasts.
Code of Federal Regulations, 2013 CFR
2013-01-01
... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...
7 CFR 1710.205 - Minimum approval requirements for all load forecasts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...
7 CFR 1710.205 - Minimum approval requirements for all load forecasts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... electronically to RUS computer software applications. RUS will evaluate borrower load forecasts for readability...'s engineering planning documents, such as the construction work plan, incorporate consumer and usage...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
7 CFR 1710.253 - Engineering and cost studies-addition of generation capacity.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Engineering and cost studies-addition of generation... TO ELECTRIC LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.253 Engineering... engineering and cost studies as specified by RUS. The studies shall cover a period from the beginning of the...
Concrete pavement construction basics : tech notes.
DOT National Transportation Integrated Search
2006-08-01
This tech note has been produced for developers, consultants, and engineers planning concrete pavement construction projects, superintendents and supervisors who want a basic training aid and reference, and crew members new to the concrete paving ind...
1989-09-01
OGT, F1EPQRTJTL4, W" - 3^ n"r-- n *ON EXPERT SYSTEMS IN DESIGN, CONSTRUCTION AND’, IWAJNTENANCE-OF STRUCTURES Arockiasamy, Sunghoon Lee Clepartrhent...based expert system applications in the areas of structural design, design standards, and construction planning. This study will aid in the development...of a comprehensive expert system for tvical hydraulic structures. Funding for this report was provided by the US Army Engineer Waterways Experiment
2012-09-20
CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser
2012-09-20
CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser
WAREHOUSE END FRAMING. United Engineering Company Ltd., Alameda Shipyard. Sections ...
WAREHOUSE END FRAMING. United Engineering Company Ltd., Alameda Shipyard. Sections at north and detail sections. No architect noted. Drawn by Penney. Plan no. 2-N-9 (U.E. Co. plan no. 10,523). Scales 1/4 inch and 1 inch to the foot. March 10, 1942, no revisions. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76, item no. 22A. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Warehouse, 2900 Main Street, Alameda, Alameda County, CA
Selection of interest and inflation rates for infrastructure investment analyses.
DOT National Transportation Integrated Search
2014-12-01
The South Dakota Department of Transportation (SDDOT) uses engineering economic analyses (EEA) to : support planning, design, and construction decision-making such as project programming and planning, : pavement type selection, and the occasional val...
7. Photographic copy of original construction drawing, ELECTRICAL 1ST AND ...
7. Photographic copy of original construction drawing, ELECTRICAL 1ST AND 2ND FLOOR PLANS, SHEET 10 of 11, DRAWING NO. 35-03-05 SF 5/1677, U.S. Army Engineer District, Detroit, Corps of Engineers, 9 June, 1959, on file Selfridge Base Museum. - Selfridge Field, Building No. 1041, West of E Street, north of D Street, Mount Clemens, Macomb County, MI
An Engineering Report in Civil Engineering and Management.
1987-12-01
programs as the Apollo program and the Canaveral program. Progress in the late 70s and the 80s has seen advancements in the application of sophisticated...other forces in military operations; subsequent combat service support ashore and defense against overt or clandestine enemy attacks directed toward...construction execution plans; assigns construction projects to NCF units; monitors progress and assures adherence to quality standards: directs
75 FR 883 - Environmental Impact Statement; Maricopa County, AZ
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-06
...: Kenneth Davis, Senior Engineering Manager for Operations, Federal Highway Administration, 4000 N. Central..., 2009. Kenneth H. Davis, Senior Engineering Manager for Operations, Federal Highway Administration... Research, Planning and Construction. The regulations implementing Executive Order 12372 regarding...
Roads and Airfields I (Programed Instruction). Engineer Subcourse 64-9.
ERIC Educational Resources Information Center
Army Engineer School, Fort Belvoir, VA.
The document is a programed text for a correspondence course in the planning, construction, and maintenance of military roads and airfields. There are seven lessons: construction requirements and design criteria; road reconnaissance and site selection; airfield reconnaissance and site selection; layout procedures, construction staking, and field…
40 CFR 35.917-1 - Content of facilities plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for...
Code of Federal Regulations, 2014 CFR
2014-01-01
... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...
Code of Federal Regulations, 2011 CFR
2011-01-01
... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...
Code of Federal Regulations, 2013 CFR
2013-01-01
... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... impacts. (2) Applicable engineering, design/build, construction management, inspection and plant start-up... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of...
Structural characterization of UHPC waffle bridge deck and connections.
DOT National Transportation Integrated Search
2014-07-01
The AASHTO strategic plan in 2005 for bridge engineering identified extending the service life of bridges and accelerating bridge : construction as two of the grand challenges in bridge engineering. These challenges have the objective of producing sa...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 12 months of data supported by engineering and design calculations, and site plans, prepared by the construction engineering firm. Biobased products. Products determined by the Secretary to be commercial or... biological products, including renewable domestic agricultural materials and forestry materials; or (2...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 12 months of data supported by engineering and design calculations, and site plans, prepared by the construction engineering firm. Biobased products. Products determined by the Secretary to be commercial or... biological products, including renewable domestic agricultural materials and forestry materials; or (2...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 12 months of data supported by engineering and design calculations, and site plans, prepared by the construction engineering firm. Biobased products. Products determined by the Secretary to be commercial or... biological products, including renewable domestic agricultural materials and forestry materials; or (2...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
Code of Federal Regulations, 2010 CFR
2010-04-01
... INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.120 How does an Indian tribe or..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or...
Engineering Design Graphics: Into the 21st Century
ERIC Educational Resources Information Center
Harris, La Verne Abe; Meyers, Frederick
2007-01-01
Graphical plans for construction of machinery and architecture have evolved over the last 6,000 years beginning from hieroglyphics to drawings on printable media, from the "Golden Age" of engineering graphics to the innovation of computer graphics and prototyping. The evolution of engineering design graphics as a profession has also evolved. Years…
The TAME Project: Towards improvement-oriented software environments
NASA Technical Reports Server (NTRS)
Basili, Victor R.; Rombach, H. Dieter
1988-01-01
Experience from a dozen years of analyzing software engineering processes and products is summarized as a set of software engineering and measurement principles that argue for software engineering process models that integrate sound planning and analysis into the construction process. In the TAME (Tailoring A Measurement Environment) project at the University of Maryland, such an improvement-oriented software engineering process model was developed that uses the goal/question/metric paradigm to integrate the constructive and analytic aspects of software development. The model provides a mechanism for formalizing the characterization and planning tasks, controlling and improving projects based on quantitative analysis, learning in a deeper and more systematic way about the software process and product, and feeding the appropriate experience back into the current and future projects. The TAME system is an instantiation of the TAME software engineering process model as an ISEE (integrated software engineering environment). The first in a series of TAME system prototypes has been developed. An assessment of experience with this first limited prototype is presented including a reassessment of its initial architecture.
5. Photographic copy of architectural floor plans for Officers' Quarters ...
5. Photographic copy of architectural floor plans for Officers' Quarters "A" & "B": Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-48 and 210-49, Military Construction: Muroc Flight Test Base, Muroc, California, Warehouses and Additional Housing for Officers: Officers Quarters, Floor Plan, Foundation Plan & Details, Sheet No. 12 of 16, May 1945. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Officers' Quarters A, North Base Road, Boron, Kern County, CA
Code of Federal Regulations, 2011 CFR
2011-04-01
..., DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS REQUIRED CONTRACT PROVISIONS Federal-Aid.... Construction. 2. Planning. 3. Research. 4. Highway Safety. 5. Engineering. 6. Property Management. 7. Fee...
ERIC Educational Resources Information Center
Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.
This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…
Building information models for astronomy projects
NASA Astrophysics Data System (ADS)
Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro
2012-09-01
A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
7. SHEET 1, CONTROL HOUSE FOR DRY DOCK. United Engineering ...
7. SHEET 1, CONTROL HOUSE FOR DRY DOCK. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. Plans, elevations, sections, details. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. 1 of 2 sheets, Plan no. 10,507. Various scales. January 4, 1943, last revised 1/28/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Control House for Dry Dock, 2900 Main Street, Alameda, Alameda County, CA
Energy efficiency in light-frame wood construction
Gerald E. Sherwood; Gunard Hans
1979-01-01
This report presents information needed for design and construction of energy-efficient light-frame wood structures. The opening section discusses improving the thermal performance of a house by careful planning and design. A second section of the report provides technical information on the thermal properties of construction materials, and on the basic engineering...
DOT National Transportation Integrated Search
2015-12-01
The Florida Department of Transportation (FDOT) has initiated business plans to promote the Transportation : Systems Management and Operations (TSM&O) program throughout the State. TSM&O is traditionally managed : by traffic engineers that focus on o...
Weil, Marcel; Jeske, Udo; Schebek, Liselotte
2006-06-01
Recycling of construction and demolition waste contributes decisively to the saving of natural mineral resources. In Germany, processed mineral construction and demolition waste from structural engineering is used nearly exclusively in civil engineering (earthwork and road construction sector) as open-loop recycling. Due to the planned stricter limit values for the protection of soil and water, however, this recycling path in civil engineering may no longer be applicable in the future. According to some new guidelines and standards adopted recently, recycled aggregates may also be used for concrete production in the structural engineering sector (closed-loop recycling). Wastes from the structural engineering sector can thus be kept in a closed cycle, and their disposal on a landfill can be avoided. The present report focuses on the determination of maximum waste volumes that may be handled by this new recycling option. Potential adverse effects on the saving of resources and climate protection have been analysed. For this purpose, materials flow analysis and ecobalancing methods have been used.
23 CFR 661.5 - What definitions apply to this regulation?
Code of Federal Regulations, 2014 CFR
2014-04-01
... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...
23 CFR 661.5 - What definitions apply to this regulation?
Code of Federal Regulations, 2012 CFR
2012-04-01
... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...
23 CFR 661.5 - What definitions apply to this regulation?
Code of Federal Regulations, 2011 CFR
2011-04-01
... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...
23 CFR 661.5 - What definitions apply to this regulation?
Code of Federal Regulations, 2010 CFR
2010-04-01
... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...
23 CFR 661.5 - What definitions apply to this regulation?
Code of Federal Regulations, 2013 CFR
2013-04-01
... prescribed scope of work. Preliminary engineering (PE) means planning, survey, design, engineering, and... survey staking functions considered necessary for effective control of the construction operations... carrying capacity (comparison of the original design load to the State legal load), clearance, or approach...
Photographic copy of architectural plan for Administration Building (T50): Taylor ...
Photographic copy of architectural plan for Administration Building (T-50): Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. A(9-10), Military Construction: Materiel Command Flight Test Base, Muroc, California, Hangar and Auxiliary Buildings: Administration Building Type OB-H-T, Plans and - Details, Sheet No. 38 of 38, March 1944. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Administration Building T-50, D Street, Boron, Kern County, CA
Mega-Project Construction Management: The Corps of Engineers and Bechtel Group in Saudi Arabia
1991-02-01
collaborative efforts of government and private firms; utilizing state-of-the-art technology; and, having economic , sociocultural, and environmental impacts...pushing out their traditional managerial corps of stodgy engineers and aristocrats."LA Although I don’t focus on individual personalities in this...help from Western economists the Central Planning Organization created Saudi Arabia’s first five year economic plan, which covered the years 1970 to
15. Photographic copy of sepia of original construction drawing dated ...
15. Photographic copy of sepia of original construction drawing dated September 15, 1938 (original sepia in plan room of Base Civil Engineer, Scott AFB) Elevations - Scott Air Force Base, General Officer Quarters, 229 Birchard Street, O'Fallon, St. Clair County, IL
23 CFR 660.117 - Funding, records and accounting.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS... be required. (b) Funds for FHs may be used for: (1) Planning; (2) Federal Lands Highway research; (3... construction project: (1) Transportation planning for tourism and recreational travel; (2) Adjacent vehicular...
NASA Astrophysics Data System (ADS)
Laughton, C.
2008-12-01
For the last half century the physics community has increasingly turned to the use of underground space to conduct basic research. The community is currently planning to conduct a new generation of underground experiments at the Deep Underground Science and Engineering Laboratory (DUSEL). DUSEL will be constructed within the footprint of the defunct Homestake Gold Mine, located in Lead, South Dakota. Physics proposals call for the construction of new caverns in which to conduct major new experiments. Some of the proposed laboratory facilities will be significantly larger and deeper than any previously constructed. The talk will highlight possible opportunities for integrating multi-disciplinary research in to the cavern construction program, and will stress the need to work closely with design and construction contractors to ensure that research goals can be achieve with minimal impact on project work. The constructors of large caverns should be particularly receptive to, and encouraging of geoscience research that could improve the engineering characterization of the rock mass. An improved understanding of the rock mass, as the host construction material, would result in a more reliable cavern design and construction process, and a reduced construction risk to the Project.
Photographic copy of construction drawing, U.S. Department of the Interior, ...
Photographic copy of construction drawing, U.S. Department of the Interior, Office of Indian Affairs, Supervising Construction Engineer, Albuquerque, New Mexico, 7 August 1936 (original print located at Albuquerque Area Office, Bureau of Indian Affairs, Albuquerque, New Mexico). Basement Plan. - Southern Ute Boarding School, Boy's Dormitory, Ouray & Capote Drives, Ignacio, La Plata County, CO
Photographic copy of construction drawing, U.S. Department of the Interior, ...
Photographic copy of construction drawing, U.S. Department of the Interior, Office of Indian Affairs, Supervising Construction Engineer, Albuquerque, New Mexico, 7 August 1936 (original print located at Albuquerque Area Office, Bureau of Indian Affairs, Albuquerque, New Mexico). Second floor plan. - Southern Ute Boarding School, Boy's Dormitory, Ouray & Capote Drives, Ignacio, La Plata County, CO
7 CFR 1710.251 - Construction work plans-distribution borrowers.
Code of Federal Regulations, 2011 CFR
2011-01-01
... generation facilities; (11) Load management equipment, automatic sectionalizing facilities, and centralized... transmission plant, and improvements replacements, and retirements of any generation plant. Construction of new generation capacity need not be included in a CWP but must be specified and supported by specific engineering...
16. Photographic copy of sepia of original construction drawing dated ...
16. Photographic copy of sepia of original construction drawing dated September 15, 1938 (original sepia in plan room of Base Civil Engineer, Scott AFB) Interior details - Scott Air Force Base, General Officer Quarters, 229 Birchard Street, O'Fallon, St. Clair County, IL
Reasons and motivations for the option of an engineering career in Portugal
NASA Astrophysics Data System (ADS)
Dias, Diana
2011-08-01
Towards the end of their secondary education, students face significant pressures in their decision about their career plan. These pressures are internal and external, personal and social, individual and from the reference group. This paper aims at understanding the reasons driving engineering students' choices, their perceived needs and aspirations. Moreover, it discusses how, in that process, students are constrained by family and friends and are conditioned by factors such as their socioeconomic and cultural background, employability prospects and gender. The construction of a career map/plan and the reasons and motivations for the option of an engineering career are reviewed, based on the qualitative analysis of students' discourses. The data indicate the relevance of several criteria such as social status, intelligence, gender, competences, values and interests in the construction of career aspirations. All these levels are highly influenced by self-esteem, which is closely related to the social value of training options and career paths.
ERIC Educational Resources Information Center
Marine Corps Inst., Washington, DC.
This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, deals with the skills needed by engineer equipment chiefs. Addressed in the five individual units of the course are the following topics: construction management (planning, scheduling, and supervision);…
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
14 CFR 151.55 - Accounting and audit.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Costs of force account construction. (5) Engineering costs of plans and designs. (6) Engineering costs... allowability of all incurred costs of the project. The sponsor shall segregate and group project costs so that it can furnish, on due notice, cost information in the following cost classifications: (1) Purchase...
Analysis on Key Points of Construction and Management of Municipal Landscape Engineering
NASA Astrophysics Data System (ADS)
Liang, Mingxia; Fei, Cheng
2018-02-01
At present, China has made great efforts to promote the construction of ecological civilization and promote the development of ecological protection and environmental construction. It has important practical significance to maintain the ecological balance and environmental quality of our country. Especially with the gradual improvement in people’s awareness of environmental protection, so that the green of the city also put forward higher requirements at the same time with the rising of the level of urbanization. In the process of urban landscape construction, the rational planning of urban landscaping involves a lot of subject knowledge. In the green process, we should fully consider the system of urban development and construction in China, based on the design of urban development and long-term planning of the landscaping project. In addition, we must also consider the traditional layout of the city area and the physical and geographical situation and so on, to enhance the objective and scientific nature of urban landscape. Therefore, it is of great practical significance to ensure the quality of landscaping in the effective management of municipal landscape engineering.
A Planning Approach of Engineering Characteristics Based on QFD-TRIZ Integrated
NASA Astrophysics Data System (ADS)
Liu, Shang; Shi, Dongyan; Zhang, Ying
Traditional QFD planning method compromises contradictions between engineering characteristics to achieve higher customer satisfaction. However, this compromise trade-off can not eliminate the contradictions existing among the engineering characteristics which limited the overall customer satisfaction. QFD (Quality function deployment) integrated with TRIZ (the Russian acronym of the Theory of Inventive Problem Solving) becomes hot research recently for TRIZ can be used to solve contradictions between engineering characteristics which construct the roof of HOQ (House of quality). But, the traditional QFD planning approach is not suitable for QFD integrated with TRIZ for that TRIZ requires emphasizing the contradictions between engineering characteristics at problem definition stage instead of compromising trade-off. So, a new planning approach based on QFD / TRIZ integration is proposed in this paper, which based on the consideration of the correlation matrix of engineering characteristics and customer satisfaction on the basis of cost. The proposed approach suggests that TRIZ should be applied to solve contradictions at the first step, and the correlation matrix of engineering characteristics should be amended at the second step, and at next step IFR (ideal final result) must be validated, then planning execute. An example is used to illustrate the proposed approach. The application indicated that higher customer satisfaction can be met and the contradictions between the characteristic parameters are eliminated.
DCSC (Defense Construction Supply Center) Total Quality Management Master Plan
1989-07-01
job while allowing them to establish a better balance between work and personal needs. 29 TQM SHORT-MID-LONG RANGE INITIATIVES MID RANGE (3 YEARS...all performance standards. IMPROVE THE QUALITY OF WORKLIFE - Projects requiring engineering support throughout FY 90 and beyond are: Construction of
41. Photocopy of microfiched construction drawing by Galloway & Markwart ...
41. Photocopy of microfiched construction drawing by Galloway & Markwart Engineers, San Francisco, California, dated Feb. 9, 1918. (Microfiched drawing located at the Denver Service Center, #104/60154 - 18 of 18) PLAN OF ELECTRICAL EQUIPMENT - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA
7 CFR 1780.54 - Technical services.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., Constructing and Inspections § 1780.54 Technical services. Owners are responsible for providing the engineering, architect and environmental services necessary for planning, designing, bidding, contracting, inspecting...
3. Photographic copy of architectural site plans for Officers' Quarters ...
3. Photographic copy of architectural site plans for Officers' Quarters "A" & "B" and Warehouses "A" & "B": Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-48 and 210-49, Military Construction: Muroc Flight Test Base, Muroc, California, Warehouses and Additional Housing for Officers: Location Plan, Grading & Paving, Sheet No. 2 of 16, May 1945. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Officers' Quarters A, North Base Road, Boron, Kern County, CA
Creating a Classroom Kaleidoscope with the World Wide Web.
ERIC Educational Resources Information Center
Quinlan, Laurie A.
1997-01-01
Discusses the elements of classroom Web presentations: planning; construction, including design tips; classroom use; and assessment. Lists 14 World Wide Web resources for K-12 teachers; Internet search tools (directories, search engines and meta-search engines); a Web glossary; and an example of HTML for a simple Web page. (PEN)
5. Photographic copy of construction drawing, dated February 6, 1942, ...
5. Photographic copy of construction drawing, dated February 6, 1942, War Department Office of the Chief of Engineers, Construction Division in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN, ELEVATION, SECTION, SHEET 203 SHEETS, DRAWING NO. 148/4-2, SF 1/141. - Selfridge Field, Building No. 3899, East of Taxiway A, west of Ammo Road, Mount Clemens, Macomb County, MI
Variable speed gas engine-driven air compressor system
NASA Astrophysics Data System (ADS)
Morgan, J. R.; Ruggles, A. E.; Chen, T. N.; Gehret, J.
1992-11-01
Tecogen Inc. and Ingersoll-Rand Co. as a subcontractor have designed a nominal 150-hp gas engine-driven air compressor utilizing the TECODRIVE 8000 engine and the Ingersoll-Rand 178.5-mm twin screw compressor. Phase 1 included the system engineering and design, economic and applications studies, and a draft commercialization plan. Phase 2 included controls development, laboratory prototype construction, and performance testing. The testing conducted verified that the compressor meets all design specifications.
NASA Technical Reports Server (NTRS)
Kennedy, Carolyn D.
2007-01-01
This document is an environmental assessment that examines the environmental impacts of a proposed plan to clear land and to construct a test stand for use in testing the J-2X rocket engine at simulated altitude conditions in support of NASA's Constellation Program.
27. Photographic copy of original construction drawing, dated May 22, ...
27. Photographic copy of original construction drawing, dated May 22, 1951 (from paper copy at Engineering Flight, Ellsworth Air Force Base, SD). Readiness hangar architectural: plan at clerestory & elevation. - Ellsworth Air Force Base, Readiness Hangar, Kenny Road, southeast corner of interstction with G Avenue, Blackhawk, Meade County, SD
7. Photographic copy of construction drawing 6912132 (from record group ...
7. Photographic copy of construction drawing 6912132 (from record group of Civil Engineering, Hill Air Force Base, Utah). 1940. 8'x10' negative and print. HILL FIELD, UTAH, QM GAS & OIL HOUSE PLAN, ELEVATIONS, DETAIL & STRUCTURAL. - Hill Field, Quatermaster Gas & Oil House, 7326 Wardleigh Road, Layton, Davis County, UT
TRUSS DETAILS. United Engineering Company Ltd., Alameda Shipyard. Includes crane ...
TRUSS DETAILS. United Engineering Company Ltd., Alameda Shipyard. Includes crane girder section. No architect noted. Drawn by Penney. Plan no. 2-N-7. March 10, 1942, no revisions. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76, item no. 22A. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Warehouse, 2900 Main Street, Alameda, Alameda County, CA
Robotics Laboratory to Enhance the STEM Research Experience
2015-04-30
the Chemistry Program has a student working on the design and development of a Stirling Engine , which the student is planning to construct using...scale): Number of graduating undergraduates funded by a DoD funded Center of Excellence grant for Education, Research and Engineering : The number of... engineering or technology fields: Student Metrics This section only applies to graduating undergraduates supported by this agreement in this reporting
Discussion on teaching reform of environmental planning and management
NASA Astrophysics Data System (ADS)
Zhang, Qiugen; Chen, Suhua; Xie, Yu; Wei, Li'an; Ding, Yuan
2018-05-01
The curriculum of environmental planning and management is an environmental engineering major curriculum established by the teaching steering committee of environmental science and engineering of Education Ministry, which is the core curriculum of Chinese engineering education professional certification. It plays an important role in cultivating environmental planning and environmental management ability of environmental engineering major. The selection and optimization of the course teaching content of environmental planning and management were discussed which including curriculum teaching content updating and optimizing and teaching resource system construction. The comprehensive application of teaching method was discussed which including teaching method synthesis and teaching method. The final combination of the assessment method was also discussed which including the formative assessment normal grades and the final result of the course examination. Through the curriculum comprehensive teaching reform, students' knowledge had been broadened, the subject status and autonomy of learning had been enhanced, students' learning interest had been motivated, the ability of students' finding, analyzing and solving problems had been improved. Students' innovative ability and positive spirit had been well cultivated.
2013-03-01
planning tools, expeditionary airbase location optimization, knowledge transfer at deployment rotation turnover, exercises and evaluations, and others...laying airfield matting Constructing earth berms and dikes for fuel bladders or unsheltered aircraft Modifying existing facilities for alternate...Providing all essential utilities Constructing earth berms and access roads for bomb dumps Constructing communication tower foundations
5. Photographic copy of construction drawing, dated April 4, 1942, ...
5. Photographic copy of construction drawing, dated April 4, 1942, War Department Office of the Chief of Engineers Construction Division, Washington, D.C., in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ARCHITECTURAL AND ELECTRICAL, ELEVATIONS AND PLAN, SHEET 1 OF 2, DRAWING 38-1-5B. - Selfridge Field, Building No. 30, Wright Boulevard opposite Birch Street, Mount Clemens, Macomb County, MI
Design and application of BIM based digital sand table for construction management
NASA Astrophysics Data System (ADS)
Fuquan, JI; Jianqiang, LI; Weijia, LIU
2018-05-01
This paper explores the design and application of BIM based digital sand table for construction management. Aiming at the demands and features of construction management plan for bridge and tunnel engineering, the key functional features of digital sand table should include three-dimensional GIS, model navigation, virtual simulation, information layers, and data exchange, etc. That involving the technology of 3D visualization and 4D virtual simulation of BIM, breakdown structure of BIM model and project data, multi-dimensional information layers, and multi-source data acquisition and interaction. Totally, the digital sand table is a visual and virtual engineering information integrated terminal, under the unified data standard system. Also, the applications shall contain visual constructing scheme, virtual constructing schedule, and monitoring of construction, etc. Finally, the applicability of several basic software to the digital sand table is analyzed.
1989-09-01
projections of planned construction, overhaul and repair work from both the public and commercial sectors can never sustain the industry at a level which...and other government organizations to support the Shipyard Recovery Plan and the revitalization of commercial shipbuilding in America. Expanding...engineer sitting next to the organization that does work package planning on ships and from the fleet. It won’t be, at least in these competitive firms
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-23
... export of goods and services for the design and construction of an aquarium. Brief non-proprietary... industry. Parties: Principal Supplier: International Concept Management. Obligor: State of Cear[aacute... Planning, Budget and Management. Description of Items Being Exported: Design, engineering and construction...
20. Photographic copy of the original construction drawing, 193031, by ...
20. Photographic copy of the original construction drawing, 1930-31, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department, Jefferson City, Missouri. Truss stress diagram, and plans of laterals and sway braces - Gasconade Bridge, Spanning Gasconade River at State Route 100, Gasconade, Gasconade County, MO
15. Photographic copy of construction drawing DP28827 (from record group ...
15. Photographic copy of construction drawing DP-28827 (from record group of Civil Engineering, Hill Air Force Base, Utah). Dec. 16, 1940. 8x10 negative and print. STANDARD BLACK POWDER SCREENING BUILDING. ROOF FRAMING PLAN & DETAILS. - Ogden Arsenal, Black Powder Screening Building, 7745 Navajo Way, Layton, Davis County, UT
11. Photographic copy of lines drawing of original construction (24 ...
11. Photographic copy of lines drawing of original construction (24 January 1911, in possession of St. Louis County Bridge Engineer, Virginia, Minnesota). Profile of main and approach spans; plan and sectional view of concrete river pier - Brosseau Road Bridge, County Road 694 spanning Cloquet at River, Burnett, St. Louis County, MN
14. DREDGING MAP. United Engineering Company Ltd., Alameda Shipyard. Ship ...
14. DREDGING MAP. United Engineering Company Ltd., Alameda Shipyard. Ship repair facilities dredging map. No architect noted. Drawn by "J.H." (John Hudspeth?). Sheet 1. Plan no. 10,529. Scale one inch to 50 feet. September 22, 1943. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 18, 1943. blueprint - United Engineering Company Shipyard, 2900 Main Street, Alameda, Alameda County, CA
36 CFR 327.30 - Shoreline Management on Civil Works Projects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...
Photographic copy of construction drawing, U.S. Department of the Interior, ...
Photographic copy of construction drawing, U.S. Department of the Interior, Office of Indian Affairs, Supervising Construction Engineer, Albuquerque, New Mexico, 7 August 1936 (original print located at Albuquerque, New Mexico, 7 August 1936 (original print located at Albuquerque Area Office, Bureau of Indian Affairs, Albuquerque, New Mexico). First floor plan. - Southern Ute Boarding School, Boy's Dormitory, Ouray & Capote Drives, Ignacio, La Plata County, CO
6. Photographic copy of construction drawing, dated August 28, 1942, ...
6. Photographic copy of construction drawing, dated August 28, 1942, War Department Office of the Chief of Engineers, Construction Division, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. TYPE TAR-8-A, PLAN OF APRONS AND TAXIWAYS, SHEET 1 OF 3 SHEETS, DRAWING NO. 148/4-1, SF 1/141. - Selfridge Field, Building No. 3899, East of Taxiway A, west of Ammo Road, Mount Clemens, Macomb County, MI
ERIC Educational Resources Information Center
Jianwei, Yang; Aihua, Zhu; Yuanyuan, Zhang; Chunqing, Zhao
2016-01-01
According to the idea of CDIO engineering education, this paper, combing with professional certification, makes training plan of Urban Rail Transit Vehicles Engineering direction in our school on the basis of research on universities at home and abroad. It strengthens the teaching of basic subjects and increases the weeks of practice link in the…
Low-Cost In-Fill Installation for High-Energy-Saving, Dynamic Windows
2017-07-01
greenhouse gas, HVAC, low emissivity, military construction, photovoltaic, physical vapor deposition, solar heat gain coefficient... Physical vapor deposition ROICC Resident Officer In Charge of Construction SHGC Solar heat gain coefficient S/RM Sustainment, Restoration, and...PERMITS AND REGULATIONS Regulations - The demonstration project planning and implementation followed US Army Corps of Engineers Safety and Health
South Carolina School Facilities Planning and Construction Guide.
ERIC Educational Resources Information Center
South Carolina State Dept. of Education, Columbia. Office of School Planning and Building.
This publication, the result of a review of state school construction regulations, was developed for the purpose of providing an up-to-date guide on current laws, regulations, and the technology of the building profession. It is intended for architects and engineers as well as for school superintendents and boards of trustees, all of whom are…
Analysis of Engineering Faculty Members' Reflections on Planning for Instruction
ERIC Educational Resources Information Center
Warcholak, Nicholas D.
2014-01-01
The purpose of this study was to begin development of a method to better describe the instructional planning processes of post-secondary teachers. Long term, it is hoped this work might have constructive implications for faculty development by providing a few case studies demonstrating how instructors with a strong interest in teaching think about…
Code of Federal Regulations, 2011 CFR
2011-07-01
...-Cities landfill, Salt River Pima-Maricopa Indian Community. 49.22 Section 49.22 Protection of Environment... MANAGEMENT Tribal Authority § 49.22 Federal implementation plan for Tri-Cities landfill, Salt River Pima... construction of electricity-generating engines owned and operated by the Salt River Project at the Tri-Cities...
Photographic copy of foundation plans for Administration Building (T50), Operations ...
Photographic copy of foundation plans for Administration Building (T-50), Operations Building (T-42), and Inflammable Storage Building (T-57): Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. A(9-10), Military Construction: Materiel Command Flight Test Base, Muroc, California, Hangar and Auxiliary Buildings: Administration Bldg Type OB-H-T, Operations Bldg Type OB-A-T, Inflammable Storage Bldg. Type WHSE 1-A (Mod.) Foundation Plans, Sheet No. 35 of 38, March 1944. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Administration Building T-50, D Street, Boron, Kern County, CA
46 CFR 50.20-30 - Alternative materials or methods of construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ENGINEERING GENERAL PROVISIONS Plan Submittal and Approval § 50.20-30 Alternative materials or methods of... disapproval thereof. (b) If, in the development of industrial arts, improved materials or methods of...
46 CFR 50.20-30 - Alternative materials or methods of construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ENGINEERING GENERAL PROVISIONS Plan Submittal and Approval § 50.20-30 Alternative materials or methods of... disapproval thereof. (b) If, in the development of industrial arts, improved materials or methods of...
46 CFR 50.20-30 - Alternative materials or methods of construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ENGINEERING GENERAL PROVISIONS Plan Submittal and Approval § 50.20-30 Alternative materials or methods of... disapproval thereof. (b) If, in the development of industrial arts, improved materials or methods of...
46 CFR 50.20-30 - Alternative materials or methods of construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ENGINEERING GENERAL PROVISIONS Plan Submittal and Approval § 50.20-30 Alternative materials or methods of... disapproval thereof. (b) If, in the development of industrial arts, improved materials or methods of...
46 CFR 50.20-30 - Alternative materials or methods of construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ENGINEERING GENERAL PROVISIONS Plan Submittal and Approval § 50.20-30 Alternative materials or methods of... disapproval thereof. (b) If, in the development of industrial arts, improved materials or methods of...
8. Photographic copy of original construction drawing, dated August 10, ...
8. Photographic copy of original construction drawing, dated August 10, 1976, Civil Engineering, Selfridge Air National Guard Base, in possession of Selfridge Base Museum, Mt. Clemens, Michigan, ALTER AIRCRAFT SHELTERS, FLOOR PLAN BUILDING NO. 21, DRAWINGS SLF-210-163. - Selfridge Field, Building Nos. 20 & 21, East Ramp south of intersection of Wilbur Wright & Birch Streets, Mount Clemens, Macomb County, MI
Assessing problem-solving skills in construction education with the virtual construction simulator
NASA Astrophysics Data System (ADS)
Castronovo, Fadi
The ability to solve complex problems is an essential skill that a construction and project manager must possess when entering the architectural, engineering, and construction industry. Such ability requires a mixture of problem-solving skills, ranging from lower to higher order thinking skills, composed of cognitive and metacognitive processes. These skills include the ability to develop and evaluate construction plans and manage the execution of such plans. However, in a typical construction program, introducing students to such complex problems can be a challenge, and most commonly the learner is presented with only part of a complex problem. To support this challenge, the traditional methodology of delivering design, engineering, and construction instruction has been going through a technological revolution, due to the rise of computer-based technology. For example, in construction classrooms, and other disciplines, simulations and educational games are being utilized to support the development of problem-solving skills. Previous engineering education research has illustrated the high potential that simulations and educational games have in engaging in lower and higher order thinking skills. Such research illustrated their capacity to support the development of problem-solving skills. This research presents evidence supporting the theory that educational simulation games can help with the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems. The educational simulation game employed in this study is the Virtual Construction Simulator (VCS). The VCS is a game developed to provide students in an engaging learning activity that simulates the planning and managing phases of a construction project. Assessment of the third iteration of the VCS(3) game has shown pedagogical value in promoting students' motivation and a basic understanding of construction concepts. To further evaluate the benefits on problem-solving skills, a new version of the VCS(4) was developed, with new building modules and assessment framework. The design and development of the VCS4 leveraged research in educational psychology, multimedia learning, human-computer interaction, and Building Information Modeling. In this dissertation the researcher aimed to evaluate the pedagogical value of the VCS4 in fostering problem-solving skills. To answer the research questions, a crossover repeated measures quasi-experiment was designed to assess the educational gains that the VCS can provide to construction education. A group of 34 students, attending a fourth-year construction course at a university in the United States was chosen to participate in the experiment. The three learning modules of the VCS were used, which challenged the students to plan and manage the construction process of a wooden pavilion, the steel erection of a dormitory, and the concrete placement of the same dormitory. Based on the results the researcher was able to provide evidence supporting the hypothesis that the chosen sample of construction students were able to gain and retain problem-solving skills necessary to solve complex construction simulation problems, no matter what the sequence with which these modules were played. In conclusion, the presented results provide evidence supporting the theory that educational simulation games can help the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems.
22. Photographic copy of an asconstructed site plan for North ...
22. Photographic copy of an as-constructed site plan for North Base: Job No. Muroc AFB A-52, War Department-Corps of Engineers, Office of the District Engineer, Los Angeles, California: Muroc Air Force Base, Muroc, California; Additonal Sprinkler Facilities, Test Base, Electrical Distribution & Pump House No. 3 Details, Sheet No. 14 of 17, October 1950. This drawing gives the contemporary temporary building numbers (T-xx) for all structures at North Base in 1950 Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA
Constructing a modern cytology laboratory: A toolkit for planning and design.
Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A
2013-01-01
Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects.
Constructing a modern cytology laboratory: A toolkit for planning and design
Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A.
2013-01-01
Introduction: Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. Methods: The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. Results: The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Conclusions: Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects PMID:23599722
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eccleston, C.H.
1997-09-05
The National Environmental Policy Act (NEPA) of 1969 was established by Congress more than a quarter of a century ago, yet there is a surprising lack of specific tools, techniques, and methodologies for effectively implementing these regulatory requirements. Lack of professionally accepted techniques is a principal factor responsible for many inefficiencies. Often, decision makers do not fully appreciate or capitalize on the true potential which NEPA provides as a platform for planning future actions. New approaches and modem management tools must be adopted to fully achieve NEPA`s mandate. A new strategy, referred to as Total Federal Planning, is proposed formore » unifying large-scale federal planning efforts under a single, systematic, structured, and holistic process. Under this approach, the NEPA planning process provides a unifying framework for integrating all early environmental and nonenvironmental decision-making factors into a single comprehensive planning process. To promote effectiveness and efficiency, modem tools and principles from the disciplines of Value Engineering, Systems Engineering, and Total Quality Management are incorporated. Properly integrated and implemented, these planning tools provide the rigorous, structured, and disciplined framework essential in achieving effective planning. Ultimately, the goal of a Total Federal Planning strategy is to construct a unified and interdisciplinary framework that substantially improves decision-making, while reducing the time, cost, redundancy, and effort necessary to comply with environmental and other planning requirements. At a time when Congress is striving to re-engineer the governmental framework, apparatus, and process, a Total Federal Planning philosophy offers a systematic approach for uniting the disjointed and often convoluted planning process currently used by most federal agencies. Potentially this approach has widespread implications in the way federal planning is approached.« less
Specific features of modern multifunctional high-rise building construction
NASA Astrophysics Data System (ADS)
Manukhina, Lyubov; Samosudova, Natal'ja
2018-03-01
The article analyzes the main reasons for the development of high-rise building construction the most important of which-is a limitation of the urban areas and, consequently, the high price of land reserved for construction. New engineering and compositional solutions for the creation of new types of buildings are considered - complex technical designs of a large number of storeys completely meet the new requirements for safety and comfort. Some peculiarities of designing high-rise buildings and searching for optimal architectural and planning solutions are revealed since, with external architectural simplicity, high-rise buildings have complex structural and technological and space-planning solutions. We consider the specific features of a high-rise housing in various countries around the world, including Russia, such as the layout of the multi-storey residential buildings, depending on the climatic characteristics of the regions, assessment of the geological risk of the construction site, the choice of parameters and functional purpose of the sections of the territory of high-rise construction, location of the town-planning object for substantiating the overall dimensions of the building, assessment of changes aeration and engineering and hydrological conditions of the site. A special place in the article on the problems of improvement of the territory, the device of courtyards, landscaping, the device of playing and sports grounds. The main conclusion in the article is the following problem - when developing high-rise housing construction, the development of high-rise housing, and an increase in the population density in the territory of large cities of Russia, necessary to create a comfortable and safe level of residents living and not a decrease, but an improvement in the quality of the urban environment.
8. SHEET 2, CONTROL HOUSE FOR DRY DOCK. United Engineering ...
8. SHEET 2, CONTROL HOUSE FOR DRY DOCK. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. 2 of 2 sheets, Plan no. 10,507. Various scales. January 4, 1943, last revised 1/19/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Control House for Dry Dock, 2900 Main Street, Alameda, Alameda County, CA
[Building Process and Architectural Planning Characteristics of Daehan Hospital Main Building].
Lee, Geauchul
2016-04-01
This paper explores the introduction process of Daehan Hospital from Japan as the modern medical facility in Korea, and the architectural planning characteristics as a medical facility through the detailed building process of Daehan Hospital main building. The most noticeable characteristic of Daehan Hospital is that it was designed and constructed not by Korean engineers but by Japanese engineers. Therefore, Daehan Hospital was influenced by Japanese early modern medical facility, and Japanese engineers modeled Daehan Hospital main building on Tokyo Medical School main building which was constructed in 1876 as the first national medical school and hospital. The architectural type of Tokyo Medical School main building was a typical school architecture in early Japanese modern period which had a middle corridor and a pseudo Western-style tower, but Tokyo Medical School main building became the model of a medical facility as the symbol of the medical department in Tokyo Imperial University. This was the introduction and transplantation process of Japanese modern 'model' like as other modern systems and technologies during the Korean modern transition period. However, unlike Tokyo Medical School main building, Daehan Hospital main building was constructed not as a wooden building but as a masonry building. Comparing with the function of Daehan Hospital main building, its architectural form and construction costs was excessive scale, which was because Japanese Resident-General of Korea had the intention of ostentation that Japanese modernity was superior to Korean Empire.
7. Photographic copy of the original construction drawing, dated June ...
7. Photographic copy of the original construction drawing, dated June 1934, from the linens in possession of U.S. Army Engineers, Rock Island District, Clock Tower Building, Arsenal Island, Rock Island, Illinois. MISSISSIPPI RIVER, LOCK AND DAM NO. 15, LOCK OPERATOR'S SHELTER HOUSE, ELEVATIONS AND PLANS - Locks & Dam No. 15, Locks Operator's Shelter House, Arsenal Island, Upper Mississippi River, Rock Island, Rock Island County, IL
PBF Reactor Building (PER620). Construction view shows native lava rock ...
PBF Reactor Building (PER-620). Construction view shows native lava rock surrounding basement excavation and general complexity of planning required to build the PBF. A three-inch low-pressure air line protrudes from wall just below left center. Date: February 21, 1967. Photographer: Larry Page. INEEL negative no. 67-1125 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
8. Copy of construction drawing, dated May 28, 1974, Selfridge ...
8. Copy of construction drawing, dated May 28, 1974, Selfridge ANG Base, Civil Engineering, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. CONVERSION/ALTERATION OF EXISTING HEATING PLANTS, MECHANICAL, DEMOLITION, BUILDING 122, PLAN NO. SLF 140-108, SHEETS 12, 13, 14, 15 OF 29. - Selfridge Field, Building No. 122, North of Wilbur Wright Boulevard between Walnut & Birch Streets, Mount Clemens, Macomb County, MI
1990-01-01
76,951,000 shall be available for study , planning, design, architect and engineer services, as authorized by law, unless the Secretary of Defense...FROM OTHER APPROPRIATIONS - (NCN-ADD) ( 0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This is a public private venture project using 10 U.S.C. 2809...FROM OTHER APPROPRIATIONS - - (NDN-ADD) ( 0) 10. DESCRIPTION OF PROPOSED CONSTRUCTION This is a public/private venture project using 10 U.S.C. 2809
1990-07-01
at the different skill levels are: C-1 a. MOSC 12B10. Assists combat engineers by performing combat construction, combat demolitions, and related...duties. b. MOSC 12B20. Performs as team leader and assistant squad leader in combat construction, demolition, and duties. c. MOSC 12B30. Serves as squad...instructor. d. MOSC 12B40. Serves as platoon sergeant; as operations sergeant; as construction inspector; as advisor to supported units, allied forces
Planning and design considerations in karst terrain
NASA Astrophysics Data System (ADS)
Fischer, J. A.; Greene, R. W.; Ottoson, R. S.; Graham, T. C.
1988-10-01
This article discusses the various steps that the authors feel are necessary to the successful progression of an engineered project sited in karst terrain. The procedures require a multidisciplined approach with liaison and cooperation among the various parties to the project. Initially, the prospective owner must have sufficient understanding of the potential engineering problems to incorporate the engineering geologist into the early stages of any planned acquisition. The first step in an investigation should include a review of the available geologic information, aerial photo interpretation, consultation with the State Geological Survey, and a geologic reconnaissance of the prospective site and surrounding area. A go-no-go decision as to purchase can often been made at an early time. Although, in some instances, more study is needed for a particularly intriguing property. The second stage should consider the various planning alternatives that are feasible based upon the limited available information. At this stage planning/purchase decisions can be made as to purchasing options, value of the property, design constraints, and the possible economic penalties that could be associated with the potential site construction. Various planning and construction alternatives should be considered in this phase of the work. The third stage should include a site investigation program of moderate size, consisting of test pits and/or exploratory borings. The borings should be drilled using water as the drilling fluid, with an experienced crew and qualified technical inspection. The authors find the use of geophysical techniques can be extremely misleading unless used in conjunction with exploratory drilling. Successful evaluations using geophysical procedures occur only under ideal conditions. The geotechnical viability of the plan and preliminary design should be investigated in the fourth phase. Additionally, the physical parameters required for the design of structures founded atop cavities can be obtained at this time. Several support schemes which incorporate cavity roof thickness, rock strength, and cavity space are discussed. Possible construction procedures include excavation and dental concrete, grouting, piers or piles to sound rock, or moving to another area. The relative economies of these procedures are discussed in relation to the size and depth of the soil or rock cavity, possible future cavity formation, magnitude of loading and acceptable safety factors.
Predicting on-site environmental impacts of municipal engineering works
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu
2014-01-15
The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering projectmore » documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also help contractors to implement environmental management systems.« less
NASA Astrophysics Data System (ADS)
Zagroba, Marek
2016-10-01
This paper deals with the conditions underlying and the problems arising from the siting of a building with specialist laboratories in a developed part of the university campus in Olsztyn, Poland. The topography of the terrain and the need to house civil engineering laboratories in the planned building had an immense impact on the shape of the building and consequently on its foundations, whose dimensions responded to the ground conditions and the specification of various loads they would have to support, including the equipment for the laboratories. The siting of a building as a step in the construction process entails several problems, which are first taken into consideration at the stage of making preliminary concept plans and are subsequently verified while working on the final construction plan. The required information included geotechnical documentation, survey of the ground conditions and the data regarding the predicted loads on the building, necessary to select the right type of foundations. All these problems grow in importance when dealing with such unique buildings like the discussed example of a laboratory building for the Civil Engineering Department, built on a site within a conservation zone on the campus of the University of Warmia and Mazury in Olsztyn, Poland. The specific character of the building and the specialist equipment with which it was to be furnished (a resistance testing machine, a 17-meter-long wave flume) necessitated a series of analyses prior to the siting of the building and selecting suitable foundations. In turn, the fact that the new building was to be erected in the conservation zone meant that collaboration with the Heritage Conservation Office had to be undertaken at the stage of making the plan and continued during the construction works. The Heritage Officer's recommendations concerning the building's shape, divisions, dimensions, materials used, etc., created a situation where the team of designers and architects had to become engaged in the process of landscape and spatial management. The above requirements concerned the functions of the building and its siting on a land parcel that was difficult to handle, also because of the protected trees growing there. Other constraints included the small size of this site, the developed surroundings, and the pre-defined programme of functions and use of the new building. On the other hand, the siting of the planned building had to be accommodated to the existing underground infrastructure (utilities). All the above circumstances made the task difficult and demanded good coordination between individual teams of engineers and architects, both at the stage of making the plan and during the construction works.
Determination of sustainable values for the parameters of the construction of residential buildings
NASA Astrophysics Data System (ADS)
Grigoreva, Larisa; Grigoryev, Vladimir
2018-03-01
For the formation of programs for housing construction and planning of capital investments, when developing the strategic planning companies by construction companies, the norms or calculated indicators of the duration of the construction of high-rise residential buildings and multifunctional complexes are mandatory. Determination of stable values of the parameters for the high-rise construction residential buildings provides an opportunity to establish a reasonable duration of construction at the planning and design stages of residential complexes, taking into account the influence of market conditions factors. The concept of the formation of enlarged models for the high-rise construction residential buildings is based on a real mapping in time and space of the most significant redistribution with their organizational and technological interconnection - the preparatory period, the underground part, the above-ground part, external engineering networks, landscaping. The total duration of the construction of a residential building, depending on the duration of each redistribution and the degree of their overlapping, can be determined by one of the proposed four options. At the same time, a unified approach to determining the overall duration of construction on the basis of the provisions of a streamlined construction organization with the testing of results on the example of high-rise residential buildings of the typical I-155B series was developed, and the coefficients for combining the work and the main redevelopment of the building were determined.
13. Photographic copy of site plan displaying Test Stand 'C' ...
13. Photographic copy of site plan displaying Test Stand 'C' (4217/E-18), Test Stand 'D' (4223/E-24), and Control and Recording Center (4221/E-22) with ancillary structures, and connecting roads and services. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office 'Repairs to Test Stand 'C,' Edwards Test Station, Legend & Site Plan M-1,' drawing no. ESP/115, August 14, 1987. - Jet Propulsion Laboratory Edwards Facility, Test Stand C, Edwards Air Force Base, Boron, Kern County, CA
Simplified web-based decision support method for traffic management and work zone analysis.
DOT National Transportation Integrated Search
2017-01-01
Traffic congestion mitigation is one of the key challenges that transportation planners and operations engineers face when planning for construction and maintenance activities. There is a wide variety of approaches and methods that address work zone ...
Simplified web-based decision support method for traffic management and work zone analysis.
DOT National Transportation Integrated Search
2015-06-01
Traffic congestion mitigation is one of the key challenges that transportation planners and operations engineers face when : planning for construction and maintenance activities. There is a wide variety of approaches and methods that address work : z...
Guidelines for preliminary selection of the optimum interchange type for a specific location
DOT National Transportation Integrated Search
1999-01-01
In Virginia, when new construction or major reconstruction is planned, the current practice is for a location and design engineer to select the interchange type (diamond interchange, single-point urban interchange, trumpet interchange, full cloverlea...
Analysis and Development of a Web-Enabled Planning and Scheduling Database Application
2013-09-01
establishes an entity—relationship diagram for the desired process, constructs an operable database using MySQL , and provides a web- enabled interface for...development, develop, design, process, re- engineering, reengineering, MySQL , structured query language, SQL, myPHPadmin. 15. NUMBER OF PAGES 107 16...relationship diagram for the desired process, constructs an operable database using MySQL , and provides a web-enabled interface for the population of
Systems engineering studies of on-orbit assembly operation
NASA Technical Reports Server (NTRS)
Morgenthaler, George W.
1991-01-01
While the practice of construction has a long history, the underlying theory of construction is relatively young. Very little has been documented as to techniques of logistic support, construction planning, construction scheduling, construction testing, and inspection. The lack of 'systems approaches' to construction processes is certainly one of the most serious roadblocks to the construction of space structures. System engineering research efforts at CSC are aimed at developing concepts and tools which contribute to a systems theory of space construction. The research is also aimed at providing means for trade-offs of design parameters for other research areas in CSC. Systems engineering activity at CSC has divided space construction into the areas of orbital assembly, lunar base construction, interplanetary transport vehicle construction, and Mars base construction. A brief summary of recent results is given. Several models for 'launch-on-time' were developed. Launch-on-time is a critical concept to the assembly of such Earth-orbiting structures as the Space Station Freedom, and to planetary orbiters such as the Mars transfer vehicle. CSC has developed a launch vehicle selection model which uses linear programming to find optimal combinations of launch vehicles of various sizes (Atlas, Titan, Shuttles, HLLV's) to support SEI missions. Recently, the Center developed a cost trade-off model for studying on orbit assembly logistics. With this model it was determined that the most effective size of the HLLV would be in the range of 120 to 200 metric tons to LEO, which is consistent with the choices of General Stafford's Synthesis Group Report. A second-generation Dynamic Construction Activities Model ('DYCAM') process model has been under development, based on our past results in interruptability and our initial DYCAM model. This second-generation model is built on the paradigm of knowledge-based expert systems. It is aimed at providing answers to two questions: (1) what are some necessary or sufficient conditions for judging conceptual designs of spacecraft?, and (2) can a methodology be formulated such that these conditions may be used to provide computer-aided tools for evaluating conceptual designs and planning for space assembly sequences? Early simulation results indicate that the DYCAM model has a clear ability to emulate and simulate human orbital construction processes.
Air Tight: Building Inflatables/Inflatable Construction: Planning and Details
NASA Technical Reports Server (NTRS)
Kennedy, Kriss J.
2016-01-01
A design-build seminar consisting of students from Physics, Mechanical and Civil Engineering, Robotic, Material Science, Art, and Architecture who will work together on a deployable "closed-loop" inflatable greenhouse for Mars in theory, and an Earth analogue physical mockup on campus.
7 CFR 1822.264 - Eligibility requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... least 10 community leaders. (ii) Plan to adopt, if it is being newly organized, articles of incorporation and bylaws that generally conform to model articles and bylaws provided by the State director... engineering, architectural or construction contracts, necessary equipment, or the purchase or development of...
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
EXTERIOR ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard, Ship Repair ...
EXTERIOR ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. Includes lettering detail for front elevation. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. A3 of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/21/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA
Knowledge, attitude and practices for design for safety: A study on civil & structural engineers.
Goh, Yang Miang; Chua, Sijie
2016-08-01
Design for safety (DfS) (also known as prevention through design, safe design and Construction (Design and Management)) promotes early consideration of safety and health hazards during the design phase of a construction project. With early intervention, hazards can be more effectively eliminated or controlled leading to safer worksites and construction processes. DfS is practiced in many countries, including Australia, the UK, and Singapore. In Singapore, the Manpower Ministry enacted the DfS Regulations in July 2015, which will be enforced from August 2016 onwards. Due to the critical role of civil and structural (C&S) engineers during design and construction, the DfS knowledge, attitude and practices (KAP) of C&S engineers have significant impact on the successful implementation of DfS. Thus, this study aims to explore the DfS KAP of C&S engineers so as to guide further research in measuring and improving DfS KAP of designers. During the study, it was found that there is a lack of KAP studies in construction management. Therefore, this study also aims to provide useful lessons for future applications of the KAP framework in construction management research. A questionnaire was developed to assess the DfS KAP of C&S engineers. The responses provided by 43 C&S engineers were analyzed. In addition, interviews with experienced construction professionals were carried out to further understand perceptions of DfS and related issues. The results suggest that C&S engineers are supportive of DfS, but the level of DfS knowledge and practices need to be improved. More DfS guidelines and training should be made available to the engineers. To ensure that DfS can be implemented successfully, there is a need to study the contractual arrangements between clients and designers and the effectiveness of different implementation approaches for the DfS process. The questionnaire and findings in this study provided the foundation for a baseline survey with larger sample size, which is currently being planned. In contrast to earlier studies, the study showed that the responding C&S engineers were supportive of the DfS. The study showed that the key to improving the DfS KAP of C&S engineers is by improving clients' motivation for DfS. Copyright © 2015 Elsevier Ltd. All rights reserved.
HYNOL PROCESS ENGINEERING: PROCESS CONFIGURATION, SITE PLAN, AND EQUIPMENT DESIGN
The report describes the design of the hydropyrolysis reactor system of the Hynol process. (NOTE: A bench scale methanol production facility is being constructed to demonstrate the technical feasibility of producing methanol from biomass using the Hynol process. The plant is bein...
Earthworks logistics in the high density urban development conditions - case study
NASA Astrophysics Data System (ADS)
Sobotka, A.; Blajer, M.
2017-10-01
Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.
Directional Gila River crossing saves construction, mitigation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saylor, L.A.
1994-12-01
Directional drilled river crossing technology gained a new convert this fall as El Paso Natural Gas Co. (EPNG) replaced a washed out 10 3/4-in. line that crossed the Gila River and two irrigation canals near Yuma, Ariz. The 1,650-ft bore, the company's first drilled river crossing, saved both construction costs and environmental reporting and mitigation expenses. This paper reviews the planning, engineering, and equipment used to install this river pipeline crossing.
NASA Astrophysics Data System (ADS)
Kopanitsa, Natalia O.
2015-01-01
In October 15-17, 2014 International Scientific Conference of Young Scientists: Advanced Materials in Construction and Engineering (TSUAB2014) took place at Tomsk State University of Architecture and Building (Tomsk, Russia). The Conference became a discussion platform for researchers in the fields of studying structure and properties of advanced building materials and included open lectures of leading scientists and oral presentations of master, postgraduate and doctoral students. A special session was devoted to reports of school children who further plan on starting a research career. The Conference included an industrial exhibition where companies displayed the products and services they supply. The companies also gave presentations of their products within the Conference sessions.
NASA Astrophysics Data System (ADS)
1981-09-01
The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.
NASA Technical Reports Server (NTRS)
1981-01-01
The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.
Handbook on Architectural Services.
ERIC Educational Resources Information Center
Adams, Hugh D.; And Others
Alabama State Building Commission policies and procedures are established for the use of all agencies, architects, and engineers working under the jurisdiction of the Commission. All school construction with the exception of mobile classroom units is covered, and general procedures are outlined followed by the requirements for plan submittals.…
46 CFR 8.230 - Minimum standards for a recognized classification society.
Code of Federal Regulations, 2011 CFR
2011-10-01
... and maintain class rules in the English language for the design, construction and certification of ships and their associated essential engineering systems; (8) Maintain written survey procedures in the... and geographical coverage to carry out all plan review and vessel survey activities associated with...
46 CFR 8.230 - Minimum standards for a recognized classification society.
Code of Federal Regulations, 2012 CFR
2012-10-01
... and maintain class rules in the English language for the design, construction and certification of ships and their associated essential engineering systems; (8) Maintain written survey procedures in the... and geographical coverage to carry out all plan review and vessel survey activities associated with...
75 FR 65551 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
... at a $3.00 PFC Level: New terminal development schematic preliminary engineering study and design... for Collection and Use: Air carrier apron. Pavement condition inventory. New terminal building... construction. De-icing treatment plant. Domestic water service. CTX design and installation. Landside planning...
Martin Frechilla, J J
1996-01-01
The individuals and circumstances involved in the creation of the first graduate urban studies program in Venezuela are recalled, beginning with the odernization of Caracas under the impulse of President Antonio Guzman Blanco, elected in 1870. Guzman Blanco converted himself into Venezuela's first urbanist with the establishment of organizational frameworks and completion of massive public works projects, which were based largely on the urban models of the US and Europe. Engineering and public health were consolidated as the two most influential sources of professional competence for guiding urban development. By the mid-1930s, growth fueled by petroleum revenues was causing rapid urbanization, and it became apparent that trained professionals able to manage the increasingly complex tasks of urban planning were in short supply. A new surge of modernizing construction began in 1936 and led to a cooperative arrangement with a French firm, whose personnel were to be required to train Venezuelan engineers for future service in urban planning. An influx of refugees from the Spanish Civil War and the increasing influence of urban planning processes in the US were also observed. The National Commission on Urbanism was created in 1946 as a dependency of the Ministry of Planning to facilitate public administration of the development and control of cities. Throughout the period, a debate was underway on the need for a multidisciplinary approach to urban planning versus a primarily architectural or engineering approach. In 1957, some consensus was reached on the need for urban planning to be viewed as more than a speciality of architecture. A framework was developed for a graduate program in 1969 in the Central University of Venezuela. The National Commission on Urbanism was disbanded in 1957, largely because of its excessive focus on architecture to the exclusion of other disciplines relevant to the urbanization process.
Application of NASA ERTS-1 satellite imagery in coastal studies
NASA Technical Reports Server (NTRS)
Magoon, O. T.; Berg, D. W. (Principal Investigator); Hallermeier, R. J.
1973-01-01
There are no author-identified significant results in this report. Review of ERTS-1 imagery indicates that it contains information of great value in coastal engineering studies. A brief introduction is given to the methods by which imagery is generated, and examples of its application to coastal engineering. Specific applications discussed include study of the movement of coastal and nearshore sediment-laden water masses and information for planning and construction in remote areas of the world.
The challenge of logistics facilities development
NASA Technical Reports Server (NTRS)
Davis, James R.
1987-01-01
The paper discusses the experiences of a group of engineers and logisticians at John F. Kennedy Space center in the design, construction and activation of a consolidated logistics facility for support of Space Transportation System ground operations and maintenance. The planning, methodology and processes are covered, with emphasis placed on unique aspects and lessons learned. The project utilized a progressive design, baseline and build concept for each phase of construction, with the Government exercising funding and configuration oversight.
40 CFR 270.23 - Specific part B information requirements for miscellaneous units.
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for miscellaneous units. 270.23 Section 270.23 Protection of Environment ENVIRONMENTAL PROTECTION... characteristics, materials of construction, and dimensions of the unit; (2) Detailed plans and engineering reports... address and ensure compliance of the unit with each factor in the environmental performance standards of...
46 CFR 189.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., the arrangement of the alarm and extinguishing systems, the fire extinguishers, means of access to... other fire control features. (3) Details of alarm systems. (4) Details of extinguishing systems, including fire mains, carbon dioxide, clean agent, foam, and sprinkling systems. (e) Marine engineering. For...
46 CFR 189.55-5 - Plans and specifications required for new construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., the arrangement of the alarm and extinguishing systems, the fire extinguishers, means of access to... other fire control features. (3) Details of alarm systems. (4) Details of extinguishing systems, including fire mains, carbon dioxide, clean agent, foam, and sprinkling systems. (e) Marine engineering. For...
This Time, Let's Put Energy Conservation on the Blueprint for New Schools.
ERIC Educational Resources Information Center
Hansen, Shirley J.
1985-01-01
With a new round of school construction on the horizon, planners must consider such energy conservation measures as placing energy consumption limitations in design specifications, retaining experienced engineers, using staff expertise, considering boilers offering fuel options, seeking outside assistance, resisting use of existing plans, and…
Operation and Maintenance Support Information (OMSI) Creation, Management, and Repurposing With XML
2004-09-01
engines that cost tens of thousands of dollars. There are many middleware applications on the commercial and open-source market . The “Big Four......planners can begin an incremental planning effort early in the facility construction phase. This thesis provides a non-proprietary, no- cost solution to
Application of geotechnical data to resource planning in southeast Alaska.
W.L. Schroeder; D.N. Swanston
1987-01-01
Recent quantification of engineering properties and index values of dominant soil types in the Alexander Archipelago, southeast Alaska, have revealed consistent diagnostic characteristics useful to evaluating landslide risk and subgrade material stability before timber harvesting and low-volume road construction. Shear strength data are summarized and grouped by Soil...
Photocopy of drawing (original drawing of Photographic Laboratory Building in ...
Photocopy of drawing (original drawing of Photographic Laboratory Building in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1939 architectural drawings by Construction Division, Office of the Quartermaster General) PLANS - MacDill Air Force Base, Photographic Laboratory, 7718 Hanger Loop Drive, Tampa, Hillsborough County, FL
Personnel Requirements Consideration in Major Weapon System Acquisition. Research Planning Report
1980-03-01
of scientific study of human attributes associated with job performance. Sir Francis Galton (1822-1911) is considered the father of engineering...analysis of nonrelevant factors. Implementation of this plan will result in construction and pilot testing of a computer based branching decision...logic in 1980-81 and field testing and evaluation in 1981-82. . . 1. SSCuaITY CLASIPICATION Op TuiS PAOI(’I.A baa. Seoto, I Finch, F.L., Rigg, K.E. and
Demonstration of a Spoken Dialogue Interface for Planning Activities of a Semi-autonomous Robot
NASA Technical Reports Server (NTRS)
Dowding, John; Frank, Jeremy; Hockey, Beth Ann; Jonsson, Ari; Aist, Gregory
2002-01-01
Planning and scheduling in the face of uncertainty and change pushes the capabilities of both planning and dialogue technologies by requiring complex negotiation to arrive at a workable plan. Planning for use of semi-autonomous robots involves negotiation among multiple participants with competing scientific and engineering goals to co-construct a complex plan. In NASA applications this plan construction is done under severe time pressure so having a dialogue interface to the plan construction tools can aid rapid completion of the process. But, this will put significant demands on spoken dialogue technology, particularly in the areas of dialogue management and generation. The dialogue interface will need to be able to handle the complex dialogue strategies that occur in negotiation dialogues, including hypotheticals and revisions, and the generation component will require an ability to summarize complex plans. This demonstration will describe a work in progress towards building a spoken dialogue interface to the EUROPA planner for the purposes of planning and scheduling the activities of a semi-autonomous robot. A prototype interface has been built for planning the schedule of the Personal Satellite Assistant (PSA), a mobile robot designed for micro-gravity environments that is intended for use on the Space Shuttle and International Space Station. The spoken dialogue interface gives the user the capability to ask for a description of the plan, ask specific questions about the plan, and update or modify the plan. We anticipate that a spoken dialogue interface to the planner will provide a natural augmentation or alternative to the visualization interface, in situations in which the user needs very targeted information about the plan, in situations where natural language can express complex ideas more concisely than GUI actions, or in situations in which a graphical user interface is not appropriate.
Gene Composer: database software for protein construct design, codon engineering, and gene synthesis
Lorimer, Don; Raymond, Amy; Walchli, John; Mixon, Mark; Barrow, Adrienne; Wallace, Ellen; Grice, Rena; Burgin, Alex; Stewart, Lance
2009-01-01
Background To improve efficiency in high throughput protein structure determination, we have developed a database software package, Gene Composer, which facilitates the information-rich design of protein constructs and their codon engineered synthetic gene sequences. With its modular workflow design and numerous graphical user interfaces, Gene Composer enables researchers to perform all common bio-informatics steps used in modern structure guided protein engineering and synthetic gene engineering. Results An interactive Alignment Viewer allows the researcher to simultaneously visualize sequence conservation in the context of known protein secondary structure, ligand contacts, water contacts, crystal contacts, B-factors, solvent accessible area, residue property type and several other useful property views. The Construct Design Module enables the facile design of novel protein constructs with altered N- and C-termini, internal insertions or deletions, point mutations, and desired affinity tags. The modifications can be combined and permuted into multiple protein constructs, and then virtually cloned in silico into defined expression vectors. The Gene Design Module uses a protein-to-gene algorithm that automates the back-translation of a protein amino acid sequence into a codon engineered nucleic acid gene sequence according to a selected codon usage table with minimal codon usage threshold, defined G:C% content, and desired sequence features achieved through synonymous codon selection that is optimized for the intended expression system. The gene-to-oligo algorithm of the Gene Design Module plans out all of the required overlapping oligonucleotides and mutagenic primers needed to synthesize the desired gene constructs by PCR, and for physically cloning them into selected vectors by the most popular subcloning strategies. Conclusion We present a complete description of Gene Composer functionality, and an efficient PCR-based synthetic gene assembly procedure with mis-match specific endonuclease error correction in combination with PIPE cloning. In a sister manuscript we present data on how Gene Composer designed genes and protein constructs can result in improved protein production for structural studies. PMID:19383142
Lorimer, Don; Raymond, Amy; Walchli, John; Mixon, Mark; Barrow, Adrienne; Wallace, Ellen; Grice, Rena; Burgin, Alex; Stewart, Lance
2009-04-21
To improve efficiency in high throughput protein structure determination, we have developed a database software package, Gene Composer, which facilitates the information-rich design of protein constructs and their codon engineered synthetic gene sequences. With its modular workflow design and numerous graphical user interfaces, Gene Composer enables researchers to perform all common bio-informatics steps used in modern structure guided protein engineering and synthetic gene engineering. An interactive Alignment Viewer allows the researcher to simultaneously visualize sequence conservation in the context of known protein secondary structure, ligand contacts, water contacts, crystal contacts, B-factors, solvent accessible area, residue property type and several other useful property views. The Construct Design Module enables the facile design of novel protein constructs with altered N- and C-termini, internal insertions or deletions, point mutations, and desired affinity tags. The modifications can be combined and permuted into multiple protein constructs, and then virtually cloned in silico into defined expression vectors. The Gene Design Module uses a protein-to-gene algorithm that automates the back-translation of a protein amino acid sequence into a codon engineered nucleic acid gene sequence according to a selected codon usage table with minimal codon usage threshold, defined G:C% content, and desired sequence features achieved through synonymous codon selection that is optimized for the intended expression system. The gene-to-oligo algorithm of the Gene Design Module plans out all of the required overlapping oligonucleotides and mutagenic primers needed to synthesize the desired gene constructs by PCR, and for physically cloning them into selected vectors by the most popular subcloning strategies. We present a complete description of Gene Composer functionality, and an efficient PCR-based synthetic gene assembly procedure with mis-match specific endonuclease error correction in combination with PIPE cloning. In a sister manuscript we present data on how Gene Composer designed genes and protein constructs can result in improved protein production for structural studies.
3D printing for clinical application in otorhinolaryngology.
Zhong, Nongping; Zhao, Xia
2017-12-01
Three-dimensional (3D) printing is a promising technology that can use a patient's image data to create complex and personalized constructs precisely. It has made great progress over the past few decades and has been widely used in medicine including medical modeling, surgical planning, medical education and training, prosthesis and implants. Three-dimensional (3D) bioprinting is a powerful tool that has the potential to fabricate bioengineered constructs of the desired shape layer-by-layer using computer-aided deposition of living cells and biomaterials. Advances in 3D printed implants and future tissue-engineered constructs will bring great progress to the field of otolaryngology. By integrating 3D printing into tissue engineering and materials, it may be possible for otolaryngologists to implant 3D printed functional grafts into patients for reconstruction of a variety of tissue defects in the foreseeable future. In this review, we will introduce the current state of 3D printing technology and highlight the applications of 3D printed prosthesis and implants, 3D printing technology combined with tissue engineering and future directions of bioprinting in the field of otolaryngology.
New business opportunity: Green field project with new technology
NASA Astrophysics Data System (ADS)
Lee, Seung Jae; Woo, Jong Hun; Shin, Jong Gye
2014-06-01
Since 2009 of global financial crisis, shipbuilding industry has undergone hard times seriously. After such a long depression, the latest global shipping market index shows that the economic recovery of global shipbuilding market is underway. Especially, nations with enormous resources are going to increase their productivity or expanding their shipyards to accommodate a large amount of orders expected in the near future. However, few commercial projects have been carried out for the practical shipyard layout designs even though those can be good commercial opportunities for shipbuilding engineers. Shipbuilding starts with a shipyard construction with a large scale investment initially. Shipyard design and the equipment layout problem, which is directly linked to the productivity of ship production, is an important issue in the production planning of mass production of ships. In many cases, shipbuilding yard design has relied on the experience of the internal engineer, resulting in sporadic and poorly organized processes. Consequently, economic losses and the trial and error involved in such a design process are inevitable problems. The starting point of shipyard construction is to design a shipyard layout. Four kinds of engineering parts required for the shipyard layout design and construction. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is used as a foundation of the other engineering parts, and also, determines the shipyard capacity in the shipyard lifecycle. In this paper, the background of shipbuilding industry is explained in terms of engineering works for the recognition of the macro trend. Nextly, preliminary design methods and related case study is introduced briefly by referencing the previous research. Lastly, the designed work of layout design is validated using the computer simulation technology.
Georgia Institute of Technology chilled water system evaluation and master plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-05-15
As the host of the Olympic Village for the 1996 Atlanta Olympics, Georgia Tech has experienced a surge in construction activities over the last three years. Over 1.3 million square feet of new buildings have been constructed on the Georgia Tech campus. This growth has placed a strain on the Georgia Tech community and challenged the facilities support staff charged with planning and organizing utility services. In concert with Olympic construction, utility planners have worked to ensure long term benefits for Georgia Tech facilities while meeting the short term requirements of the Olympic Games. The concentration of building construction inmore » the northwest quadrant of the campus allowed planners to construct a satellite chilled water plant to serve the needs of this area and provide the opportunity to integrate this section of the campus with the main campus chilled water system. This assessment and master plan, funded in part by the US Department of Energy, has evaluated the chilled water infrastructure at Georgia Tech, identified ongoing problems and made recommendations for long term chilled water infrastructure development and efficiency improvements. The Georgia Tech office of Facilities and RDA Engineering, Inc. have worked together to assemble relevant information and prepare the recommendations contained in this document.« less
NASA Astrophysics Data System (ADS)
Bespalov, V.; Kotlyarova, E.
2017-10-01
In modern conditions of a stable urban areas development special place is occupied by the problem of ecological security of built-up areas, including residential, recreational, industrial areas and objects of transport and engineering infrastructure. The main results of the study are to establish the basis of formation of the concept of choice of energy-efficient technologies and tools of forming an ecologically efficient “green frame” of urban areas on the basis of a single integrated scientific concept. Analysis allowed us to divide the measures for improvement into the following main groups: organizational and planning, engineering and technical and special engineering and environmental. The significance of these results for the construction industry, including transport infrastructure, is to increase the level of environmental safety in the construction and reconstruction of urban areas due to the organization of their improvement on the basis suggested by the authors scientific approach. Its basis is integrated accounting of the natural and climatic features of the landscaping territory, the types and level of environmental impact of negative anthropogenic factors, the features of architectural and planning solutions of the existing or projected on the studied area, the structure and types of green spaces and their functional ecological properties.
Physics Goals for the Planned Next Linear Collider Engineering Test Facility
NASA Astrophysics Data System (ADS)
Raubenheimer, T. O.
2001-10-01
The Next Linear Collider (NLC) Collaboration is planning to construct an Engineering Test Facility (ETF) at Fermilab. As presently envisioned, the ETF would comprise a fundamental unit of the NLC main linac to include X-band klystrons and modulators, a delay-line power-distribution system (DLDS), and NLC accelerating structures that serve as loads. The principal purpose of the ETF is to validate stable operation of the power-distribution system, first without beam, then with a beam having the NLC pulse structure. This paper concerns the possibility of configuring and using the ETF to accelerate beam with an NLC pulse structure, as well as of doing experiments to measure beam-induced wakefields in the rf structures and their influence back on the beam.
NASA Astrophysics Data System (ADS)
Claver, C. F.; Selvy, Brian M.; Angeli, George; Delgado, Francisco; Dubois-Felsmann, Gregory; Hascall, Patrick; Lotz, Paul; Marshall, Stuart; Schumacher, German; Sebag, Jacques
2014-08-01
The Large Synoptic Survey Telescope project was an early adopter of SysML and Model Based Systems Engineering practices. The LSST project began using MBSE for requirements engineering beginning in 2006 shortly after the initial release of the first SysML standard. Out of this early work the LSST's MBSE effort has grown to include system requirements, operational use cases, physical system definition, interfaces, and system states along with behavior sequences and activities. In this paper we describe our approach and methodology for cross-linking these system elements over the three classical systems engineering domains - requirement, functional and physical - into the LSST System Architecture model. We also show how this model is used as the central element to the overall project systems engineering effort. More recently we have begun to use the cross-linked modeled system architecture to develop and plan the system verification and test process. In presenting this work we also describe "lessons learned" from several missteps the project has had with MBSE. Lastly, we conclude by summarizing the overall status of the LSST's System Architecture model and our plans for the future as the LSST heads toward construction.
The application of micro UAV in construction project
NASA Astrophysics Data System (ADS)
Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura
2017-10-01
In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.
Impact of distributed virtual reality on engineering knowledge retention and student engagement
NASA Astrophysics Data System (ADS)
Sulbaran, Tulio Alberto
Engineering Education is facing many problems, one of which is poor knowledge retention among engineering students. This problem affects the Architecture, Engineering, and Construction (A/E/C) industry, because students are unprepared for many necessary job skills. This problem of poor knowledge retention is caused by many factors, one of which is the mismatch between student learning preferences and the media used to teach engineering. The purpose of this research is to assess the impact of Distributed Virtual Reality (DVR) as an engineering teaching tool. The implementation of DVR addresses the issue of poor knowledge retention by impacting the mismatch between learning and teaching style in the visual versus verbal spectrum. Using as a point of departure three knowledge domain areas (Learning and Instruction, Distributed Virtual Reality and Crane Selection as Part of Crane Lift Planning), a DVR engineering teaching tool is developed, deployed and assessed in engineering classrooms. The statistical analysis of the data indicates that: (1) most engineering students are visual learners; (2) most students would like more classes using DVR; (3) engineering students find DVR more engaging than traditional learning methods; (4) most students find the responsiveness of the DVR environments to be either good or very good; (5) all students are able to interact with DVR and most of the students found it easy or very easy to navigate (without previous formal training in how to use DVR); (6) students' knowledge regarding the subject (crane selection) is higher after the experiment; and, (7) students' using different instructional media do not demonstrate statistical difference in knowledge retained after the experiment. This inter-disciplinary research offers opportunities for direct and immediate application in education, research, and industry, due to the fact that the instructional module developed (on crane selection as part of construction crane lift planning) can be used to convey knowledge to engineers beyond the classrooms. This instructional module can also be used as a workbench to assess parameters on engineering education such as time on task, assessment media, and long-term retention among others.
30 CFR 77.216-5 - Water, sediment or slurry impoundments and impounding structures; abandonment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... are met: (1) A registered professional engineer, knowledgeable in the principles of dam design and in the design and construction of the structure, shall certify that it substantially conforms to the approved design plan and specifications and that there are no apparent defects. (2) The current owner or...
30 CFR 77.216-5 - Water, sediment or slurry impoundments and impounding structures; abandonment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... are met: (1) A registered professional engineer, knowledgeable in the principles of dam design and in the design and construction of the structure, shall certify that it substantially conforms to the approved design plan and specifications and that there are no apparent defects. (2) The current owner or...
Code of Federal Regulations, 2013 CFR
2013-04-01
... THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or environmental impact reports and archeological reports. (b) An Indian tribe or tribal organization is not...
Code of Federal Regulations, 2012 CFR
2012-04-01
... THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or environmental impact reports and archeological reports. (b) An Indian tribe or tribal organization is not...
Code of Federal Regulations, 2011 CFR
2011-04-01
... THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or environmental impact reports and archeological reports. (b) An Indian tribe or tribal organization is not...
Code of Federal Regulations, 2014 CFR
2014-04-01
... THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or environmental impact reports and archeological reports. (b) An Indian tribe or tribal organization is not...
Cultural Landscape Inventory for Picatinny Arsenal, New Jersey
2016-08-01
district, site, building, structure, or object. Identification of potentially significant properties is achieved only through a survey and evaluation to...68 3.9.6 Experimental Test Facility (Building 606) ................................................................ 71 3.9.7...Construction Engineering Research Laboratory FRP Facility Reduction Plan HABS Historic American Buildings Survey NAD Naval Ammunition Depot NARA National
Information Manual: Procedures, Planning Concepts, Subsystems. ABS Publication No. 3.
ERIC Educational Resources Information Center
California Univ., Berkeley.
This report, the third in a series which presents the results of a systems analysis of the problem of providing science and engineering buildings at the university level, is a technical manual for using the Academic Building Systems (ABS) approach in programing, designing, and constructing such facilities. The document presents (1) planning…
Photocopy of drawing (original drawing of War Department Theater in ...
Photocopy of drawing (original drawing of War Department Theater in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) FIRST FLOOR AND CEILING PLAN - MacDill Air Force Base, Base Theater, 2420 Florida Keys Avenue, Tampa, Hillsborough County, FL
Photocopy of drawing (original drawing of War Department Theater in ...
Photocopy of drawing (original drawing of War Department Theater in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) FLOOR PLAN AND BENCH DETAILS - MacDill Air Force Base, Base Theater, 2420 Florida Keys Avenue, Tampa, Hillsborough County, FL
7 CFR 1942.18 - Community facilities-Planning, bidding, contracting, constructing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Poisoning and Prevention Act of 1971 (42 U.S.C. 4801) and the National Consumer Health Information and... (Government Printing Office stock No. 041-001-00187-5) as prepared by the Federal Coordinating Council for Science, Engineering and Technology. (14) Pipe. All pipe used shall meet current American Society for...
Photocopy of drawing (original drawing of PaintOil & Dope Building ...
Photocopy of drawing (original drawing of Paint-Oil & Dope Building in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) PLAN AND ELEVATIONS - MacDill Air Force Base, Paint, Oil & Dope Building, 7716 Hanger Loop Drive, Tampa, Hillsborough County, FL
Photocopy of drawing (original drawing of Signal & Ordnance Warehouse ...
Photocopy of drawing (original drawing of Signal & Ordnance Warehouse in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) PLANS, ELEVATIONS, SECTIONS AND DETAILS - MacDill Air Force Base, Signal & Ordnance Warehouse, 7620 Hanger Loop Drive, Tampa, Hillsborough County, FL
Review of NASA's Hypersonic Research Engine Project
NASA Technical Reports Server (NTRS)
Andrews, Earl H.; Mackley, Ernest A.
1993-01-01
The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a hypersonic research ramjet/scramjet engine for high performance and to flight-test the developed concept over the speed range from Mach 3 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research aircraft, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of engine models then became the focus of the project. Two axisymmetric full-scale engine models having 18-inch-diameter cowls were fabricated and tested: a structural model and a combustion/propulsion model. A brief historical review of the project with salient features, typical data results, and lessons learned is presented.
Engineering and erection of a 300kW high-flux solar simulator
NASA Astrophysics Data System (ADS)
Wieghardt, Kai; Laaber, Dmitrij; Hilger, Patrick; Dohmen, Volkmar; Funken, Karl-Heinz; Hoffschmidt, Bernhard
2017-06-01
German Aerospace Center (DLR) is currently constructing a new high-flux solar simulator synlight which shall be commissioned in late 2016. The new facility will provide three separately operated experimental spaces with expected radiant powers of about 300kW / 240kW / 240kW respectively. synlight was presented to the public for the first time at SolarPACES 2015 [1]. Its engineering and erection is running according to plan. The current presentation reports about the engineering and the ongoing erection of the novel facility, and gives an outlook on its new level of possibilities for solar testing and qualification.
Rojas, David; Grierson, Lawrence; Mylopoulos, Maria; Trbovich, Patricia; Bagli, Darius; Brydges, Ryan
2018-04-01
We evaluate programmes in health professions education (HPE) to determine their effectiveness and value. Programme evaluation has evolved from use of reductionist frameworks to those addressing the complex interactions between programme factors. Researchers in HPE have recently suggested a 'holistic programme evaluation' aiming to better describe and understand the implications of 'emergent processes and outcomes'. We propose a programme evaluation framework informed by principles and tools from systems engineering. Systems engineers conceptualise complexity and emergent elements in unique ways that may complement and extend contemporary programme evaluations in HPE. We demonstrate how the abstract decomposition space (ADS), an engineering knowledge elicitation tool, provides the foundation for a systems engineering informed programme evaluation designed to capture both planned and emergent programme elements. We translate the ADS tool to use education-oriented language, and describe how evaluators can use it to create a programme-specific ADS through iterative refinement. We provide a conceptualisation of emergent elements and an equation that evaluators can use to identify the emergent elements in their programme. Using our framework, evaluators can analyse programmes not as isolated units with planned processes and planned outcomes, but as unfolding, complex interactive systems that will exhibit emergent processes and emergent outcomes. Subsequent analysis of these emergent elements will inform the evaluator as they seek to optimise and improve the programme. Our proposed systems engineering informed programme evaluation framework provides principles and tools for analysing the implications of planned and emergent elements, as well as their potential interactions. We acknowledge that our framework is preliminary and will require application and constant refinement. We suggest that our framework will also advance our understanding of the construct of 'emergence' in HPE research. © 2017 John Wiley & Sons Ltd and The Association for the Study of Medical Education.
Weather support area, floor plan and details. ("Alter COC, Bldg. ...
Weather support area, floor plan and details. ("Alter COC, Bldg. 2605, Weather Support Area, Floor Plan & Details" Also includes a site plan and a finish schedule. The exact location of this construction is obscure, but it appears to be the enclosure of space at the north end of room 101, the "Display Area" or "War Room") Strategic Air Command, Civil Engineering. Drawing no. B-1081, sheet no. 1 of 2, 9 July 1968; project no. MAR-132-8; CE-562; file drawer 2605-9, also 1315. Various scales. 29x41 inches. pencil on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
How to renovate a 50-year-old wastewater treating plant: Part 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hunter, M.L.
1996-01-01
How does an existing refinery cost-effectively renovate wastewater/stormwater treating systems to meet today`s environmental regulations and standards? Faced with solving this problem, Amoco`s Whiting Refinery developed a project team consisting of plant and operations engineers, corporate project and design engineers, contractors and vendors to map out a strategy to re-engineer the existing wastewater treating plant (WWTP) and auxiliary functions. This case history shows how an old refinery limited by existing equipment, building space, operation`s availability requirements and costs divided the project into several design phases. The design team used a proactive approach with empowerment responsibilities to solve construction, equipment usagemore » and regulatory problems throughout the project`s lifetime. Focusing on front-end planning and customer service (the refinery), team members applied value-based engineering designs to keep costs down, implemented safe work practices during construction, used HAZOP reviews to scrutinize proposed designs for operating and maintenance procedures, etc. The result has been the renovation of a 50-year-old WWTP completed under budget, ontime and in compliance with federal mandates.« less
NASA Astrophysics Data System (ADS)
Gold, Zachary Samuel
Engineering play is a new perspective on preschool education that views constructive play as an engineering design process that parallels the way engineers think and work when they develop engineered solutions to human problems (Bairaktarova, Evangelou, Bagiati, & Brophy, 2011). Early research from this perspective supports its use in framing play as a key learning context. However, no research to date has examined associations between engineering play and other factors linked with early school success, such as executive function, mathematical ability, and spatial ability. Additionally, more research is needed to further validate a new engineering play observational measure. This study had two main goals: (1) to gather early validity data on the engineering play measure as a potentially useful instrument for documenting the occurrence of children's engineering play behaviors in educational contexts, such as block play. This was done by testing the factor structure of the engineering play behaviors in this sample and their association with preschoolers' planning, a key aspect of the engineering design process; (2) to explore associations between preschoolers' engineering play and executive function, mathematical ability, and spatial ability. Participants included 110 preschoolers (62 girls; 48 boys; M = 58.47 months) from 10 classrooms in the Midwest United States coded for their frequency of engagement in each of the nine engineering play behaviors. A confirmatory factor analysis resulted in one engineering play factor including six of the engineering play behaviors. A series of marginal regression models revealed that the engineering play factor was significantly and positively associated with the spatial horizontal rotation transformation. However, engineering play was not significantly related to planning ability, executive function, informal mathematical abilities, or other spatial transformation skills. Follow-up analyses revealed significant positive associations between engineering play and planning, executive function, and geometry for only a subgroup of children (n = 27) who had individualized education program (IEP) status. This was the first of a series of studies planned to evaluate the potential of the engineering play perspective as a tool for understanding young children's development and learning across multiple developmental domains. Although most hypotheses regarding engineering play and cognitive skills were not supported, the study provided partial evidence for the reliability and validity of the engineering play observation measure. Future research should include larger sample sizes with more statistical power, continued refinement of the engineering play observation measure, examination of potential associations with specific early learning domains, including spatial ability and language, and more comparisons of engineering play between typically developing children and children with disabilities.
Physics Goals for the Planned Next Linear Collider Engineering Test Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raubenheimer, Tor O
2001-10-02
The Next Linear Collider (NLC) Collaboration is planning to construct an Engineering Test Facility (ETF) at Fermilab. As presently envisioned, the ETF would comprise a fundamental unit of the NLC main linac to include X-band klystrons and modulators, a delay-line power-distribution system (DLDS), and NLC accelerating structures that serve as loads. The principal purpose of the ETF is to validate stable operation of the power-distribution system, first without beam, then with a beam having the NLC pulse structure. This paper concerns the possibility of configuring and using the ETF to accelerate beam with an NLC pulse structure, as well asmore » of doing experiments to measure beam-induced wakefields in the rf structures and their influence back on the beam.« less
Physics goals for the planned next linear collider engineering test facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Courtlandt L Bohn et al.
2001-06-26
The Next Linear Collider (NLC) Collaboration is planning to construct an Engineering Test Facility (ETF) at Fermilab. As presently envisioned, the ETF would comprise a fundamental unit of the NLC main linac to include X-band klystrons and modulators, a delay-line power-distribution system (DLDS), and NLC accelerating structures that serve as loads. The principal purpose of the ETF is to validate stable operation of the power-distribution system, first without beam, then with a beam having the NLC pulse structure. This paper concerns the possibility of configuring and using the ETF to accelerate beam with an NLC pulse structure, as well asmore » of doing experiments to measure beam-induced wakefields in the rf structures and their influence back on the beam.« less
Physics goals for the planned next linear collider engineering test facility.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bohn, C.; Michelotti, L.; Ostiguy, J.-F.
2001-07-17
The Next Linear Collider (NLC) Collaboration is planning to construct an Engineering Test Facility (ETF) at Fermilab. As presently envisioned, the ETF would comprise a fundamental unit of the NLC main linac to include X-band klystrons and modulators, a delay-line power-distribution system (DLDS), and NLC accelerating structures that serve as loads. The principal purpose of the ETF is to validate stable operation of the power-distribution system, first without beam, then with a beam having the NLC pulse structure. This paper concerns the possibility of configuring and using the ETF to accelerate beam with an NLC pulse structure, as well asmore » of doing experiments to measure beam-induced wakefields in the rf structures and their influence back on the beam.« less
Li, Ke; Zhang, Peng; Crittenden, John C; Guhathakurta, Subhrajit; Chen, Yongsheng; Fernando, Harindra; Sawhney, Anil; McCartney, Peter; Grimm, Nancy; Kahhat, Ramzy; Joshi, Himanshu; Konjevod, Goran; Choi, Yu-Jin; Fonseca, Ernesto; Allenby, Braden; Gerrity, Daniel; Torrens, Paul M
2007-07-15
To encourage sustainable development, engineers and scientists need to understand the interactions among social decision-making, development and redevelopment, land, energy and material use, and their environmental impacts. In this study, a framework that connects these interactions was proposed to guide more sustainable urban planning and construction practices. Focusing on the rapidly urbanizing setting of Phoenix, Arizona, complexity models and deterministic models were assembled as a metamodel, which is called Sustainable Futures 2100 and were used to predict land use and development, to quantify construction material demands, to analyze the life cycle environmental impacts, and to simulate future ground-level ozone formation.
Photographic copy of architectural drawings for Building 4315: Taylor & ...
Photographic copy of architectural drawings for Building 4315: Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-50 and 210-44, Military Construction: Muroc Flight Test Base, Muroc, California, Utility Yard & Shops: Carpenter & Paint Shop, Utility Shop & Lavatory, Plan & Elevations, Sheet No. 4 of 8, May 1945. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Utility & Paint Shop, Second & E Streets, Boron, Kern County, CA
Photographic copy of architectural drawings for Building 4332 (T82): Taylor ...
Photographic copy of architectural drawings for Building 4332 (T-82): Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-48 and 210-49, Military Construction: Muroc Flight Test Base, Muroc, California, Warehouses and Additional Housing for Officers: Warehouse "A" Plans & Elevations, Sheet No. 4 of 16, May 1945. Reproduced from the holdings of the National Archives; Pacific Southwest Region - Edwards Air Force Base, North Base, Warehouse A, North Base Road at E Street, Boron, Kern County, CA
Code of Federal Regulations, 2013 CFR
2013-10-01
... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...
Code of Federal Regulations, 2014 CFR
2014-10-01
... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... to, construction, planning, research, highway safety, engineering, property management, and fee...
Code of Federal Regulations, 2011 CFR
2011-10-01
... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...
Code of Federal Regulations, 2012 CFR
2012-10-01
... TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 Pt. 21, App. C Appendix C to Part 21... Nondiscrimination on Federally Assisted Projects (a) Examples. The following examples, without being exhaustive... retained for, or incidental to, construction, planning, research, highway safety, engineering, property...
40 CFR 80.1335 - Can a refiner seek relief from the requirements of this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Benzene Hardship... comply with the gasoline benzene standards at § 80.1230(a) or (b) by the applicable date(s); and (2) It... will be in place for engineering and construction of benzene reduction technology, a plan for applying...
40 CFR 80.1335 - Can a refiner seek relief from the requirements of this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Benzene Hardship... comply with the gasoline benzene standards at § 80.1230(a) or (b) by the applicable date(s); and (2) It... will be in place for engineering and construction of benzene reduction technology, a plan for applying...
40 CFR 80.1335 - Can a refiner seek relief from the requirements of this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Benzene Hardship... comply with the gasoline benzene standards at § 80.1230(a) or (b) by the applicable date(s); and (2) It... will be in place for engineering and construction of benzene reduction technology, a plan for applying...
Photocopy of drawing (original drawing of Q.M. Warehouse & Commissary ...
Photocopy of drawing (original drawing of Q.M. Warehouse & Commissary in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) FIRST FLOOR PLAN AND DOOR DETAILS - MacDill Air Force Base, Quartermaster Warehouse & Commissary, 7621 Hillsborough Loop Drive, Tampa, Hillsborough County, FL
Photocopy of drawing (original drawing of Q.M. Warehouse in possession ...
Photocopy of drawing (original drawing of Q.M. Warehouse in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) PLANS, ELEVATIONS, SECTIONS, AND ELECTRICAL DETAILS - MacDill Air Force Base, Quartermaster Warehouse, 7605 Hillsborough Loop Drive, Tampa, Hillsborough County, FL
Photocopy of drawing (original drawing of Sewage Treatment Plant ...
Photocopy of drawing (original drawing of Sewage Treatment Plant - No. 1 Pump House in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) FLOOR PLANS AND SECTIONS - MacDill Air Force Base, Pump House No. 1, Hillsborough Garden Drive & Tampa Boulevard, Tampa, Hillsborough County, FL
Decision problems in management of construction projects
NASA Astrophysics Data System (ADS)
Szafranko, E.
2017-10-01
In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.
Discussion on design and stress checking of cast-in-place bracket
NASA Astrophysics Data System (ADS)
Xi, Tang Xian; Yong, He; Hu, Sun Shuan
2018-04-01
The cast-in-place bracket is the main support structure in the construction of bridge. Its strength, stiffness and stability have a direct impact on the quality and the safety of bridge construction. The design and calculation of the bracket in the prestressed concrete box girder are analyzed in this paper. The models including Bailey beam, steel crossbeam and steel columns are established by the finite element software. The strength, stiffness and stability of each model under the most unfavorable load are analyzed by MIDAS Civil. The analysis results verify that the support plan meets the relevant specifications and construction requirements. The feasibility of the support scheme was verified well accordingly. The paper can provide reference and guidance for similar engineering construction.
Department of the Air Force. FY 1995 Budget Estimates. Military Construction and Family Housing
1994-02-01
monorail lift systems and provide AFFF fire protection system, and elevators. Renovate engineering and work areas; provide new air make-up unit and...135,0U0 SY 1,200 880-212 AFFF FIRE SUPPRESSION SYSTEM LS 800 FOR FUEL CELL TOTAL: 10,450 9b. Future Projects: Typical Planned Next Three Years: 111...PROTECT 2 EA 3,600 PH II & AFFF PUMPS/RESERVOIR TOTAL: 27,900 9b. Future Projects: Typical Planned Next Three Years: 442-758 WAREHOUSE 107,000 SF
Conceptual design study of improved automotives gas turbine powertrain
NASA Technical Reports Server (NTRS)
1979-01-01
Twenty-two candidate engine concepts and nineteen transmission concepts. Screening of these concepts, predominantly for fuel economy, cost and technical risk, resulted in a recommended powertrain consisting of a single-shaft engine, with a ceramic radial turbine rotor, connected through a differential split-power transmission utilizing a variable stator torque converter and a four speed automatic gearbox. Vehicle fuel economy and performance projections, preliminary design analyses and installation studies in a were completed. A cost comparison with the conventional spark ignited gasoline engine showed that the turbine engine would be more expensive initially, however, lifetime cost of ownership is in favor of the gas turbine. A powertrain research and development plan was constructed to gain information on timing and costs to achieve the required level of technology and demonstrate the engine in a vehicle by the year 1983.
High altitude mine waste remediation -- Implementation of the Idarado remedial action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hardy, A.J.; Redmond, J.V.; River, R.A.
1999-07-01
The Idarado Mine in Colorado's San Juan Mountains includes 11 tailing areas, numerous waste rock dumps, and a large number of underground openings connected by over 100 miles of raises and drifts. The tailings and mine wastes were generated from different mining and milling operations between 1975 and 1978. the Idarado Remedial Action Plan (RAP) was an innovative 5-year program developed for remediating the impacts of historic mining activities in the San Miguel River and Red Mountain Creek drainages. The challenges during implementation included seasonal access limitations due to the high altitude construction areas, high volumes of runoff during snowmore » melt, numerous abandoned underground openings and stopped-out veins, and high profile sites adjacent to busy jeep trails and a major ski resort town. Implementation of the RAP has included pioneering efforts in engineering design and construction of remedial measures. Innovative engineering designs included direct revegetation techniques for the stabilization of tailings piles, concrete cutoff walls and French drains to control subsurface flows, underground water controls that included pipelines, weeplines, and portal collection systems, and various underground structures to collect and divert subsurface flows often exceeding 2,000 gpm. Remote work locations have also required the use of innovative construction techniques such as heavy lift helicopters to move construction materials to mines above 10,000 feet. This paper describes the 5-year implementation program which has included over 1,000,000 cubic yards of tailing regrading, application of 5,000 tons of manure and 26,000 tons of limestone, and construction of over 10,000 feet of pipeline and approximately 45,000 feet of diversion channel.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-03-01
The construction and operation of a 14,980,000 gallon per year fuel ethanol from grain refinery in the Imperial Valley of California is proposed. The Imperial Valley Ethanol Refinery (refinery) will use hot geothermal fluid from geothermal resources at the East Mesa area as the source of process energy. In order to evaluate the economic viability of the proposed Project, exhaustive engineering, cost analysis, and financial studies have been undertaken. This report presents the results of feasibility studies undertaken in geothermal resource, engineering, marketing financing, management, environment, and permits and approvals. The conclusion of these studies is that the Project ismore » economically viable. US Alcohol Fuels is proceeding with its plans to construct and operate the Refinery.« less
Comparison of free-piston Stirling engine model predictions with RE1000 engine test data
NASA Technical Reports Server (NTRS)
Tew, R. C., Jr.
1984-01-01
Predictions of a free-piston Stirling engine model are compared with RE1000 engine test data taken at NASA-Lewis Research Center. The model validation and the engine testing are being done under a joint interagency agreement between the Department of Energy's Oak Ridge National Laboratory and NASA-Lewis. A kinematic code developed at Lewis was upgraded to permit simulation of free-piston engine performance; it was further upgraded and modified at Lewis and is currently being validated. The model predicts engine performance by numerical integration of equations for each control volume in the working space. Piston motions are determined by numerical integration of the force balance on each piston or can be specified as Fourier series. In addition, the model Fourier analyzes the various piston forces to permit the construction of phasor force diagrams. The paper compares predicted and experimental values of power and efficiency and shows phasor force diagrams for the RE1000 engine displacer and piston. Further development plans for the model are also discussed.
NASA's Hypersonic Research Engine Project: A review
NASA Technical Reports Server (NTRS)
Andrews, Earl H.; Mackley, Ernest A.
1994-01-01
The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a high-performance hypersonic research ramjet/scramjet engine for flight tests of the developed concept over the speed range of Mach 4 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research airplane, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of full-scale engine models then became the focus of the project. Two axisymmetric full-scale engine models, having 18-inch-diameter cowls, were fabricated and tested: a structural model and combustion/propulsion model. A brief historical review of the project, with salient features, typical data results, and lessons learned, is presented. An extensive number of documents were generated during the HRE Project and are listed.
Engineering Geodesy - Definition and Core Competencies
NASA Astrophysics Data System (ADS)
Kuhlmann, Heiner; Schwieger, Volker; Wieser, Andreas; Niemeier, Wolfgang
2014-11-01
This article summarises discussions concerning the definition of "engineering geodesy" within the German Geodetic Commission. It is noted that engineering geodesy by means of its tasks, methods and characteristics is an application-oriented science whose research questions often arise from observed phenomena or from unsolved practical problems. In particular it is characterised by the professional handling of geometry-related problems in a cost-effective manner that includes comprehensive quality assessment at all phases of the problem solution - from planning through measurement to data processing and interpretation. The current methodical developments are primarily characterised by the increasing integration of the measurement and analysis into challenging construction, production and monitoring processes as well as by the transition to spatially continuous methods. A modern definition of engineering geodesy is proposed at the end of this article.
NASA Astrophysics Data System (ADS)
Harris, E.
Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars Reconnaissance Orbiter and Lunar Base construction scenarios. Innovative solutions utilizing Immersive Visualization provide the key to streamlining the mission planning and optimizing engineering design phases of future aerospace missions.
Photocopy of drawing (original drawing of Armament & Instrument Inspection ...
Photocopy of drawing (original drawing of Armament & Instrument Inspection and Adjustment Bldg. in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1941 architectural drawings by Construction Division, Office of the Quartermaster General) FIRST FLOOR PLAN, SECTIONS, AND DETAILS - MacDill Air Force Base, Armament & Instrument Inspection & Adjustment Building, 7807 Hanger Loop Drive, Tampa, Hillsborough County, FL
Photocopy of drawing (original drawing of Double N.C.O. Quarters in ...
Photocopy of drawing (original drawing of Double N.C.O. Quarters in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1939 architectural drawings by Construction Division, Office of the Quartermaster General) FIRST AND SECOND FLOOR PLANS - MacDill Air Force Base, Double Non-Commissioned Officers' Quarters, 7418 Hanger Loop Drive, Tampa, Hillsborough County, FL
Code of Federal Regulations, 2010 CFR
2010-04-01
..., DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction... design and approval of the PS&E package; (2) A licensed professional engineer will certify that the PS&E meets or exceeds the design, health, and safety standards in appendix B to subpart D for an IRR...
Photocopy of drawing (original drawing of Fire and Guard House ...
Photocopy of drawing (original drawing of Fire and Guard House with Communication Center in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) FIRST AND SECOND FLOOR AND ROOF PLANS - MacDill Air Force Base, Fire & Guard House, 2709 Florida Keys Avenue, Tampa, Hillsborough County, FL
STS-116 Crewmembers Curbeam and Williams work near P6 SAW during EVA 3
2006-12-17
S116-E-06603 (16 Dec. 2006) --- Astronauts Robert L. Curbeam, Jr., (red stripes), STS-116 mission specialist, and Sunita L. Williams, Expedition 14 flight engineer, work near the International Space Station's left P6 solar array wing during the mission's third planned session of extravehicular activity (EVA) as construction resumes on the International Space Station.
STS-116 Crewmembers Curbeam and Williams work near P6 SAW during EVA 3
2006-12-17
S116-E-06606 (16 Dec. 2006) --- Astronauts Robert L. Curbeam, Jr., (red stripes), STS-116 mission specialist, and Sunita L. Williams, Expedition 14 flight engineer, work near the International Space Station's left P6 solar array wing during the mission's third planned session of extravehicular activity (EVA) as construction resumes on the International Space Station.
Swarzenski, Christopher M.; Mize, Scott V.; Lovelace, John K.
2012-01-01
The Mississippi River-Gulf Outlet navigation channel (MRGO) was constructed in the early 1960s to provide a safer and shorter route between the Gulf of Mexico and the Port of New Orleans for deep-draft, ocean-going vessels and to promote the economic development of the Port of New Orleans. In 2006, the U.S. Army Corps of Engineers developed a plan to de-authorize the MRGO. The plan called for a rock barrier to be constructed across the MRGO near Bayou La Loutre. In 2008, the U.S. Geological Survey, in cooperation with the Louisiana Coastal Area Science and Technology Program began a study to document the impacts of the rock barrier on water-quality and flow before, during, and after its construction. Water-quality, bed-sediment, and discharge data were collected in the MRGO and adjacent water bodies from August 2008 through December 2009.
National Ignition Facility project acquisition plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Callaghan, R.W.
The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less
DE-EE0006714 Final Report-Project Icebreaker™
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, Lorry; Karpinski, David; Nagusky, Beth
Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less
The Incremental Launching Method for Educational Virtual Model
NASA Astrophysics Data System (ADS)
Martins, Octávio; Sampaio, A. Z.
This paper describes the application of virtual reality technology to the development of an educational model related to the construction of a bridge. The model allow the visualization of the physical progression of the work following a planned construction sequence, the observation of details of the form of every component of the works and carry the study of the type and method of operation of the equipment applied in the construction. The model admit interaction and then some degree of collaboration between students and teachers in the analyses of aspects concerning geometric forms, working methodology or other technical issues observed using the application. The model presents distinct advantage as educational aids in first-degree courses in Civil Engineering.
NASA Tech House: An early evaluation
NASA Technical Reports Server (NTRS)
1977-01-01
An architect-engineering firm, as well as university participants, performed system studies, evaluated construction methods, performed cost effectiveness studies, and prepared construction drawings which incorporated the selected technology features into a final design. A Technology Utilization House (Tech House) based on this design was constructed at the NASA Langley Research Center in Hampton, Virginia. The Tech House is instrumented so that the performance of the design features and energy systems can be evaluated during a planned family live-in period. As such, the house is both a demonstration unit and a research laboratory. The Tech House is to demonstrate the kind of single-family residence that will probably be available within the next five years.
Vertical regolith shield wall construction for lunar base applications
NASA Technical Reports Server (NTRS)
Kaplicky, Jan; Nixon, David; Wernick, Jane
1992-01-01
Lunar bases located on the lunar surface will require permanent protection from radiation and launch ejecta. This paper outlines a method of providing physical protection using lunar regolith that is constructed in situ as a modular vertical wall using specially devised methods of containment and construction. Deployable compartments, reinforced with corner struts, are elevated and filled by a moving gantry. The compartments interlock to form a stable wall. Different wall heights, thicknesses, and plan configurations are achieved by varying the geometry of the individual compartments, which are made from woven carbon fibers. Conventional terrestrial structural engineering techniques can be modified and used to establish the structural integrity and performance of the wall assembly.
1983-09-01
34 o D Qa. : "lo °%S .. " ig.22. aveQuitComand P L %S dU a a Troubleshooting There are several potential problems that the user may encounter when...34 Air Force Civil Engineer, Vol. 3, No. 3 (August 1962 ), pp. 6-7. 40. Roberts, Captain Mike. "Automated Drafting and Design for the Base Civil Engineer... Eglin AFB FL, undated. 216 . - ,. ° - . .. . . .. r! 57. . Explosive Safety Standards. AFR 127-100. Chapter 5: Principles and Application of Explo- sive
NASA Space Engineering Research Center for utilization of local planetary resources
NASA Technical Reports Server (NTRS)
Ramohalli, Kumar; Lewis, John S.
1990-01-01
The University of Arizona and NASA have joined to form the UA/NASA Space Engineering Research Center. The purpose of the Center is to discover, characterize, extract, process, and fabricate useful products from the extraterrestrial resources available in the inner solar system (the moon, Mars, and nearby asteroids). Individual progress reports covering the center's research projects are presented and emphasis is placed on the following topics: propellant production, oxygen production, ilmenite, lunar resources, asteroid resources, Mars resources, space-based materials processing, extraterrestrial construction materials processing, resource discovery and characterization, mission planning, and resource utilization.
NASA Technical Reports Server (NTRS)
1978-01-01
The building in the top photo is the new home of the National Permanent Savings Bank in Washington, D.C., designed by Hartman-Cox Architects. Its construction was based on a money-saving method of preparing building specifications which derived from NASA technology developed to obtain quality construction while holding down cost of launch facilities, test centers and other structures. Written technical specifications spell out materials and components to be used on construction projects and identify the quality tests each item must pass. Specifications can have major impact on construction costs. Poorly formulated specifications can lead to unacceptable construction which must be replaced, unnecessarily high materials costs, safety hazards, disputes and often additional costs due to delays and litigation. NASA's Langley Research Center developed a novel approach to providing accurate, uniform, cost-effective specifications which can be readily updated to incorporate new building technologies. Called SPECSINTACT, it is a computerized - system accessible to all NASA centers involved in construction programs. The system contains a comprehensive catalog of master specifications applicable to many types of construction. It enables designers of any structure to call out relevant sections from computer storage and modify them to fit the needs of the project at hand. Architects and engineers can save time by concentrating their efforts on needed modifications rather than developing all specifications from scratch. Successful use of SPECSINTACT has led to a number of spinoff systems. One of the first was MASTERSPEC, developed from NASA's experience by Production Systems for Architects and Engineers, Inc., an organization established by the American Institute of Architects. MASTERSPEC, used in construction of the bank building pictured, follows the same basic format as SPECSINTACT and can be used in either automated or manual modes. The striking appearance of the bank building shows that, while MASTERSPEC saves time and money, its use involves no sacrfice in architectural design freedom. The Naval Engineering Facilities Command employs an automated specifications system based on SPECSINTACT. The Public Buildings Service of the General Services Administration used SPECSINTACT as a starting point in a plan to make its guideline specifications available to architects and engineers on a nationwide computer network. Public Technology, Inc., a NASA Technology Application Team, is working with Production Systems for Architects and Engineers, Inc., to promote widespread use of the system by state and local governments for cost benefits to taxpayers.
Deep Borehole Field Test Requirements and Controlled Assumptions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hardin, Ernest
2015-07-01
This document presents design requirements and controlled assumptions intended for use in the engineering development and testing of: 1) prototype packages for radioactive waste disposal in deep boreholes; 2) a waste package surface handling system; and 3) a subsurface system for emplacing and retrieving packages in deep boreholes. Engineering development and testing is being performed as part of the Deep Borehole Field Test (DBFT; SNL 2014a). This document presents parallel sets of requirements for a waste disposal system and for the DBFT, showing the close relationship. In addition to design, it will also inform planning for drilling, construction, and scientificmore » characterization activities for the DBFT. The information presented here follows typical preparations for engineering design. It includes functional and operating requirements for handling and emplacement/retrieval equipment, waste package design and emplacement requirements, borehole construction requirements, sealing requirements, and performance criteria. Assumptions are included where they could impact engineering design. Design solutions are avoided in the requirements discussion. Deep Borehole Field Test Requirements and Controlled Assumptions July 21, 2015 iv ACKNOWLEDGEMENTS This set of requirements and assumptions has benefited greatly from reviews by Gordon Appel, Geoff Freeze, Kris Kuhlman, Bob MacKinnon, Steve Pye, David Sassani, Dave Sevougian, and Jiann Su.« less
Interpreting geologic maps for engineering purposes: Hollidaysburg quadrangle, Pennsylvania
,
1953-01-01
This set of maps has been prepared to show the kinds of information, useful to engineers, that can be derived from ordinary geologic maps. A few additional bits of information, drawn from other sources, are mentioned below. Some of the uses of such maps are well known; they are indispensable tools in the modern search for oil or ore deposits; they are the first essential step in unraveling the story of the earth we live on. Less well known, perhaps, is the fact that topographic and geologic maps contain many of the basic data needed for planning any engineering construction job, big or little. Any structure built by man must fit into the topographic and geologic environment shown on such maps. Moreover, most if not all construction jobs must be based on knowledge of the soils and waters, which also are intimately related to this same environment. The topographic map shows the shape of the land the hills and valleys, the streams and swamps, the man-made features such as roads, railroads, and towns. The geologic map shows the kinds and shapes of the rock bodies that form the land surface and that lie beneath it. These are the facts around which the engineer must build.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-01
During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on twomore » of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault.« less
ERIC Educational Resources Information Center
Misfeldt, Morten
2015-01-01
In this paper I describe how students use a project management simulation game based on an attack-defense mechanism where two teams of players compete by challenging each other's projects. The project management simulation game is intended to be played by pre-service construction workers and engineers. The gameplay has two parts: a planning part,…
ERIC Educational Resources Information Center
APPA: Association of Higher Education Facilities Officers, Alexandria, VA.
These 25 papers from a conference of higher education facilities offices are grouped into 5 categories: business management; energy and environment; human resources; operations and maintenance; and planning, design and construction. Papers are: (1) "Provider of Choice" (Jerry C. Black); (2) "Re-Engineering--'Inside-Inside' or Outside-Inside': A…
NASA Technical Reports Server (NTRS)
2007-01-01
Tree clearing for the site of the new A-3 Test Stand at Stennis Space center began June 13. NASA's first new large rocket engine test stand to be built since the site's inception, A-3 construction begins a historic era for America's largest rocket engine test complex. The 300-foot-tall structure is scheduled for completion in August 2010. A-3 will perform altitude tests on the Constellation's J-2X engine that will power the upper stage of the Ares I crew launch vehicle and earth departure stage of the Ares V cargo launch vehicle. The Constellation Program, NASA's plan for carrying out the nation's Vision for Space Exploration, will return humans to the moon and eventually carry them to Mars and beyond.
2007-06-13
Tree clearing for the site of the new A-3 Test Stand at Stennis Space center began June 13. NASA's first new large rocket engine test stand to be built since the site's inception, A-3 construction begins a historic era for America's largest rocket engine test complex. The 300-foot-tall structure is scheduled for completion in August 2010. A-3 will perform altitude tests on the Constellation's J-2X engine that will power the upper stage of the Ares I crew launch vehicle and earth departure stage of the Ares V cargo launch vehicle. The Constellation Program, NASA's plan for carrying out the nation's Vision for Space Exploration, will return humans to the moon and eventually carry them to Mars and beyond.
NASA Astrophysics Data System (ADS)
Johan, Kartina; Mohd Turan, Faiz
2016-11-01
‘Environmental and sustainability’ is one of the Program Outcome (PO) designated by the Board of Engineers Malaysia (BEM) as one of the accreditation program requirement. However, to-date the implementation of sustainability elements in engineering programme in the technical universities in Malaysia is within individual faculty's curriculum plan and lack of university-level structured learning pathway, which enable all students to have access to an education in sustainability across all disciplines. Sustainability Graduate Community (SGC) is a framework designed to provide a learning pathway in the curriculum of engineering programs to inculcate sustainability education among engineering graduates. This paper aims to study the required attributes in Sustainability Graduate Community (SGC) framework to produce graduates who are not just engineers but also skilful in sustainability competencies using Global Project Management (GPM) P5 Standard for Sustainability. The development of the conceptual framework is to provide a constructive teaching and learning plan for educators and policy makers to work on together in developing the Sustainability Graduates (SG), the new kind of graduates from Malaysia Technical Universities Network (MTUN) in Malaysia who are literate in sustainability practices. The framework also support the call for developing holistic students based on Malaysian Education Blueprint (Higher Education) and address the gap between the statuses of engineering qualification to the expected competencies from industries in Malaysia in particular by achieving the SG attributes outlined in the framework
NASA Astrophysics Data System (ADS)
Slagle, James H.; Hill, John M.; Davison, Warren B.; Hart, Wood; Teran, Jose U.
1998-08-01
Planning, estimating, and building a telescope and its enclosure within a budget is a challenge to any project staff. The Large Binocular Telescope (LBT) project office goal has been to break every phase of the project into small packages and competitively bid the packages. In this way the project office can minimize costs and keep the project budget from escalating out of control. This paper will discuss both the unique and common problems associated with the building of telescopes into the next millennium. The discussion is centered on the planning and execution phases of construction for the LBT, located on Mt. Graham in Arizona. The paper will discuss the effects of delays on the actual start of the telescope due to environmental issues and the impact the delays had on design and budget. The paper will provide the solutions that have been incorporated by the LBT project office to maximize the quality of construction while holding costs to a minimum. The use of a team approach by the contractors, engineers, and the project office has been successful in maintaining quality construction at a reasonable cost.
Rollinson, Andrew N.
2016-01-01
This article tells the story of engineering and technology at Castleford Water Mills from the seventeenth century to the twentieth century through the presentation of recently discovered design plans and deeds, supplemented by other historical research. One of Castleford's mills was operated by Dr Thomas Allinson's Natural Food Company and therefore retained stoneground milling when fashions for white flour prompted other mills to switch to roller systems. The millstones were powered by a high-efficiency breastshot wheel, believed to be the last of its type taken out of industrial service in Britain. Many of its features, and its subsequent longevity, can be attributed to the influential works of William Fairbairn and John Smeaton. Detailed colour designs show the construction specifications of this water-wheel and its civil housing, along with other engineering plans such as a previously unrecorded Henry Simon horizontal turbine. Links with John Smeaton and the entry in his catalogue of designs for Castleford Oil Mill are also explored, and a former flood mill is identified at the site.
Garrido, E; Calvo, F; Ramos, A F; Zamorano, M
2005-11-01
Current legislation in the European Union regarding landfills provides measures, procedures and guidance to prevent or reduce, insofar as possible, negative effects on the environment. This means that Member States must take measures so that landfills cannot operate unless the operator first presents a plan for the site, which includes the implementation of improvements considered necessary by the engineer for compliance with regulations. Researchers at the University of Granada have developed a method to ascertain the degree of environmental impact that a construction and demolition waste landfill may produce on its immediate surroundings. This methodology is based on environmental indexes; its objective is to give crucial information concerning possible environmental problems produced by a landfill. The data thus obtained will permit the elaboration of guidelines for improvements in the location, design, and operation of landfills, or in extreme cases, their dosing, sealing, and rehabilitation.
Dynamic Simulation on the Installation Process of HGIS in Transformer Substation
NASA Astrophysics Data System (ADS)
Lin, Tao; Li, Shaohua; Wang, Hu; Che, Deyong; Qi, Guangcai; Yao, Jianfeng; Zhang, Qingzhe
The technological requirements of Hypid Gas Insulated Switchgear (HGIS) installation in transformer substation is high and the control points of quality is excessive. Most of the engineers and technicians in the construction enterprises are not familiar with equipments of HGIS. In order to solve these problem, equipments of HGIS is modeled on the computer by SolidWorks software. Installation process of civil foundation and closed-type equipments is optimized dynamically with virtual assemble technology. Announcements and application work are composited into animation file. Skills of modeling and simulation is tidied classify as well. The result of the visual dynamic simulation can instruct the actual construction process of HGIS to a certain degree and can promote reasonable construction planning and management. It can also improve the method and quality of staff training for electric power construction enterprises.
NASA Astrophysics Data System (ADS)
Tynan, M. C.; Russell, G. P.; Perry, F.; Kelley, R.; Champenois, S. T.
2017-12-01
This global survey presents a synthesis of some notable geotechnical and engineering information reflected in four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies, sites, or disposal facilities; 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding deep underground "facilities", history, activities, and plans. In general, the interactive maps and database [http://gis.inl.gov/globalsites/] provide each facility's approximate site location, geology, and engineered features (e.g.: access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not all encompassing, it is a comprehensive review of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development as a communication tool applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.
NASA Astrophysics Data System (ADS)
Liu, Zhijun; Zhang, Liangpei; Liu, Zhenmin; Jiao, Hongbo; Chen, Liqun
2008-12-01
In order to manage the internal resources of Gulf of Tonkin and integrate multiple-source spatial data, the establishment of region unified plan management system is needed. The data fusion and the integrated research should be carried on because there are some difficulties in the course of the system's establishment. For example, kinds of planning and the project data format are different, and data criterion is not unified. Besides, the time state property is strong, and spatial reference is inconsistent, etc. In this article the ARCGIS ENGINE is introduced as the developing platform, key technologies are researched, such as multiple-source data transformation and fusion, remote sensing data and DEM fusion and integrated, plan and project data integration, and so on. Practice shows that the system improves the working efficiency of Guangxi Gulf of Tonkin Economic Zone Management Committee significantly and promotes planning construction work of the economic zone remarkably.
Statistical Acceptance Plan for Asphalt Pavement Construction.
1998-05-01
K. C, Freidenrich, J., and Weed, R. M. (1992). " Managing Qual- ity: Time for a National Policy," Transportation Research Record 1340...Baecher, G. (1987). "Statistical Qaulity Control of Engineered Embank- ments," Contract Report GL-87-2, Waterways Experiment Station, U.S. Army Corps...Arfington, VA22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0186). Washington, DC20503. 1 .AGENCY USE ONLY
Gildenskiold, R S; Tatyanyuk, T K; Savelyev, S I; Rekis, V K
Operation of the modern heavy aircraft on the surrounding vast territory is associated with the appearance of high levels of sound pressure generated by the powerful engines, especially during takeoff and landing operations. Currently, the elimination or significant reduction of noise pollution on the environment technically does not yet have a radical solution and the possible reduction of the impact ofnoise pollution on the residents ofnearby settlements is achievedfor residents of building by the optimal location of the runway, changing in conditions for the takeoff and landing of aircrafts, the ordering of the regimen of the airport, the introduction of the package sufficiently effective anti-noise diverse - engineering, planning activities, in some cases, the creation ofprotective noise shield on the border of the residential area and the construction ofprotective awnings over the children’s and sports fields with fencing shields converted in the direction of the runway. An example of a positive decision, taking into account the complexity and variety of aspects of the problem, it is possible to consider the development of the project plan of the new microdistrict «Eletsky» in the Soviet district of the city of Lipetsk, falling under the impact of aircraft noise of plying aircrafts of the military airfield.
NASA Astrophysics Data System (ADS)
Jin, H.; Hao, J.; Chang, X.
2009-12-01
The proposed China-Russia Crude Oil Pipeline (CRCOP), 813 mm in diameter, is designed to transport 603,000 barrels of Siberian crude oil per day using conventional burial across 1,030 km of frozen-ground. About 500 boreholes, with depths of 5 to 20 m, were drilled and cored for analyses, and the frozen-ground conditions were evaluated. After detailed surveys and analyses of the permafrost conditions along the pipeline route, a conventional burial construction mode at a nominal depth of 1.5 m was adopted. This paper discusses the principles and criteria for the zonation and assessment of the frozen-ground environments and conditions of engineering geology for the design, construction, operation of the pipeline system based on an extensive and in-depth summary and analysis of the survey and exploration data. Full consideration of the characteristics of pipelining crude oil at ambient temperatures in the permafrost regions and the interactive processes between the pipeline and foundation soils were taken into account. Two zones of frozen-ground environment and conditions of engineering geology, i. e. seasonally-frozen-ground and permafrost, were defined on the basis of the regional distribution and differentiations in frozen-ground environments and conditions. Then, four subzones of the permafrost zone were classified according to the areal extent, taking into consideration the temperatures and thicknesses of permafrost, as well as changes in vegetation coverage. In the four subzones, 151 sections of engineering geology were categorized according to the ice/moisture contents of the permafrost, as well as the classes of frost-heaving and thaw-settlement potentials. These 151 sections are comprehensively summarized into four types for engineering construction and operation: good, fair, poor, and very poor, for overall conditions of engineering geology. The zonation, assessment principles and criteria have been applied in the design of the pipeline. They have also been used as the scientific bases for the construction, environmental management, operation and maintenance/contingency plans
Mourya, Devendra T.; Yadav, Pragya D.; Majumdar, Triparna Dutta; Chauhan, Devendra S.; Katoch, Vishwa Mohan
2014-01-01
Since the enactment of Environmental Protection Act in 1989 and Department of Biotechnology (DBT) guidelines to deal with genetically modified organisms, India has embarked on establishing various levels of biosafety laboratories to deal with highly infectious and pathogenic organisms. Occurrence of outbreaks due to rapidly spreading respiratory and haemorrhagic fever causing viruses has caused an urgency to create a safe laboratory environment. This has thus become a mandate, not only to protect laboratory workers, but also to protect the environment and community. In India, technology and science are progressing rapidly. Several BSL-3 [=high containment] laboratories are in the planning or execution phase, to tackle biosafety issues involved in handling highly infectious disease agents required for basic research and diagnosis. In most of the developing countries, the awareness about biocontainment has increased but planning, designing, constructing and operating BSL-3 laboratories need regular updates about the design and construction of facilities and clear definition of risk groups and their handling which should be in harmony with the latest international practices. This article describes the major steps involved in the process of construction of a BSL-3 laboratory in Indian settings, from freezing the concept of proposal to operationalization phase. The key to success of this kind of project is strong institutional commitment to biosafety norms, adequate fund availability, careful planning and designing, hiring good construction agency, monitoring by experienced consultancy agency and involvement of scientific and engineering personnel with biocontainment experience in the process. PMID:25297350
Mourya, Devendra T; Yadav, Pragya D; Majumdar, Triparna Dutta; Chauhan, Devendra S; Katoch, Vishwa Mohan
2014-08-01
Since the enactment of Environmental Protection Act in 1989 and Department of Biotechnology (DBT) guidelines to deal with genetically modified organisms, India has embarked on establishing various levels of biosafety laboratories to deal with highly infectious and pathogenic organisms. Occurrence of outbreaks due to rapidly spreading respiratory and haemorrhagic fever causing viruses has caused an urgency to create a safe laboratory environment. This has thus become a mandate, not only to protect laboratory workers, but also to protect the environment and community. In India, technology and science are progressing rapidly. Several BSL-3 [=high containment] laboratories are in the planning or execution phase, to tackle biosafety issues involved in handling highly infectious disease agents required for basic research and diagnosis. In most of the developing countries, the awareness about biocontainment has increased but planning, designing, constructing and operating BSL-3 laboratories need regular updates about the design and construction of facilities and clear definition of risk groups and their handling which should be in harmony with the latest international practices. This article describes the major steps involved in the process of construction of a BSL-3 laboratory in Indian settings, from freezing the concept of proposal to operationalization phase. The key to success of this kind of project is strong institutional commitment to biosafety norms, adequate fund availability, careful planning and designing, hiring good construction agency, monitoring by experienced consultancy agency and involvement of scientific and engineering personnel with biocontainment experience in the process.
Activities of the Center for Space Construction
NASA Technical Reports Server (NTRS)
1993-01-01
The Center for Space Construction (CSC) at the University of Colorado at Boulder is one of eight University Space Engineering Research Centers established by NASA in 1988. The mission of the center is to conduct research into space technology and to directly contribute to space engineering education. The center reports to the Department of Aerospace Engineering Sciences and resides in the College of Engineering and Applied Science. The college has a long and successful track record of cultivating multi-disciplinary research and education programs. The Center for Space Construction is prominent evidence of this record. At the inception of CSC, the center was primarily founded on the need for research on in-space construction of large space systems like space stations and interplanetary space vehicles. The scope of CSC's research has now evolved to include the design and construction of all spacecraft, large and small. Within this broadened scope, our research projects seek to impact the underlying technological basis for such spacecraft as remote sensing satellites, communication satellites, and other special purpose spacecraft, as well as the technological basis for large space platforms. The center's research focuses on three areas: spacecraft structures, spacecraft operations and control, and regolith and surface systems. In the area of spacecraft structures, our current emphasis is on concepts and modeling of deployable structures, analysis of inflatable structures, structural damage detection algorithms, and composite materials for lightweight structures. In the area of spacecraft operations and control, we are continuing our previous efforts in process control of in-orbit structural assembly. In addition, we have begun two new efforts in formal approach to spacecraft flight software systems design and adaptive attitude control systems. In the area of regolith and surface systems, we are continuing the work of characterizing the physical properties of lunar regolith, and we are at work on a project on path planning for planetary surface rovers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hambley, D.F.; Harrison, W.; Foster, S.A.
1991-04-01
The US Army Corps of Engineers North Atlantic Division, Baltimore District (CENAB), intends to design and construct a medical and dental research facility for the Walter Reed Army Institute of Research (WRAIR) at the Walter Reed Army Medical Center (WRAMC) at Forest Glen, Maryland. Because almost 100% of the proposed building site is located on an uncontrolled landfill that was thought to possibly contain medical, toxic, radioactive, or hazardous waste, it was assumed that remediation of the site might be necessary prior to or in conjunction with excavation. To assess (1) the need for remediation and (2) the potential hazardsmore » to construction workers and the general population, the Baltimore District contracted with Argonne National Laboratory to undertake a site characterization and risk assessment and to develop a foundation-excavation plan. The results of the site characterization and a qualitative risk assessment have been presented in a previous report. This report presents the foundation-excavation plan. 38 refs., 16 figs., 11 tabs.« less
NASA Astrophysics Data System (ADS)
Farwell, D. A.; Svenson, A. J.; Ramsier, R. D.
2001-04-01
We present our recent efforts to design, construct, and test a gas turbine, or jet, engine. Our design utilizes a turbocharger and ignition system from an automobile, and a flame tube/reaction chamber unit fabricated by hand from stainless steel. Once the engine is running, it is completely self-sustaining as long as there is a fuel supply, which in our case is propane. Air is forced into the intake where it is compressed and then injected into the combustion chamber where it is mixed with propane. The spark plugs ignite the air-propane mixture which burns to produce thrust at the exhaust. We have performed operational tests under different environmental conditions and with several turbochargers. We are currently working on adding a lubrication system to the engine, and will discuss our plan to experiment with the reaction chamber and flame tube design in an effort to improve performance and efficiency. *Corresponding author: rex@uakron.edu
Perimeter security for Minnesota correctional facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crist, D.; Spencer, D.D.
1996-12-31
For the past few years, the Minnesota Department of Corrections, assisted by Sandia National Laboratories, has developed a set of standards for perimeter security at medium, close, and maximum custody correctional facilities in the state. During this process, the threat to perimeter security was examined and concepts about correctional perimeter security were developed. This presentation and paper will review the outcomes of this effort, some of the lessons learned, and the concepts developed during this process and in the course of working with architects, engineers and construction firms as the state upgraded perimeter security at some facilities and planned newmore » construction at other facilities.« less
A lunar construction shack vehicle: Final design
NASA Technical Reports Server (NTRS)
1988-01-01
A lunar construction shack vehicle is a critical component in most of the plans proposed for the construction of a permanent base on the moon. The Selene Engineering Company (SEC) has developed a concept for this vehicle which is both innovative and practical. The design makes use of the most advanced technology available to meet the goals for a safe, versatile and durable habitat that will serve as a starting point for the initial phase of the construction of a permanent lunar base. This document outlines SEC's proposed design for a lander vehicle which will be fully self-sufficient and will provide for all necessary life support, including consumables and radiation protection, needed by the construction crew until they can complete the assembly of a more permanent habitat. Since it is highly likely that it will take more than one crew to complete the construction of a permanent lunar base, the design emphasis is on systems which can be easily maintained and resupplied and which will take a minimum of start up preparation by succeeding crews.
48 CFR 1436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...
48 CFR 436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...
48 CFR 1436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...
48 CFR 1436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...
48 CFR 436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...
48 CFR 2936.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...
48 CFR 1536.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...
48 CFR 436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...
48 CFR 436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...
48 CFR 2936.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...
48 CFR 436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 436.209 Section 436.209 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 436.209 Construction contracts with architect-engineer...
48 CFR 1436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...
48 CFR 1536.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...
48 CFR 1536.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...
48 CFR 1536.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer firms. (a...
48 CFR 2936.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...
48 CFR 1436.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with architect-engineer firms. 1436.209 Section 1436.209 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1436.209 Construction contracts with architect-engineer...
48 CFR 2936.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...
48 CFR 1536.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer...
48 CFR 36.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...
48 CFR 636.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...
48 CFR 636.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...
48 CFR 636.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...
48 CFR 636.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...
48 CFR 36.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...
48 CFR 636.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with architect-engineer firms. 636.209 Section 636.209 Federal Acquisition Regulations System DEPARTMENT OF STATE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 636.209 Construction contracts with architect-engineer firms. The...
48 CFR 2936.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As required by FAR...
48 CFR 36.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...
48 CFR 36.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...
48 CFR 36.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 36.209 Section 36.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 36.209 Construction contracts with architect-engineer firms. No...
Treskes, Philipp; Cowan, Douglas B.; Stamm, Christof; Rubach, Martin; Adelmann, Roland; Wittwer, Thorsten; Wahlers, Thorsten
2015-01-01
Objective The effect of mechanical preconditioning on skeletal myoblasts in engineered tissue constructs was investigated to resolve issues associated with conduction block between skeletal myoblast cells and cardiomyocytes. Methods Murine skeletal myoblasts were used to generate engineered tissue constructs with or without application of mechanical strain. After in vitro myotube formation, engineered tissue constructs were co-cultured for 6 days with viable embryonic heart slices. With the use of sharp electrodes, electrical coupling between engineered tissue constructs and embryonic heart slices was assessed in the presence or absence of pharmacologic agents. Results The isolation and expansion procedure for skeletal myoblasts resulted in high yields of homogeneously desmin-positive (97.1% ± 0.1%) cells. Mechanical strain was exerted on myotubes within engineered tissue constructs during gelation of the matrix, generating preconditioned engineered tissue constructs. Electrical coupling between preconditioned engineered tissue constructs and embryonic heart slices was observed; however, no coupling was apparent when engineered tissue constructs were not subjected to mechanical strain. Coupling of cells from engineered tissue constructs to cells in embryonic heart slices showed slower conduction velocities than myocardial cells with the embryonic heart slices (preconditioned engineered tissue constructs vs embryonic heart slices: 0.04 ± 0.02 ms vs 0.10 ± 0.05 ms, P = .011), lower stimulation frequencies (preconditioned engineered tissue constructs vs maximum embryonic heart slices: 4.82 ± 1.42 Hz vs 10.58 ± 1.56 Hz; P = .0009), and higher sensitivities to the gap junction inhibitor (preconditioned engineered tissue constructs vs embryonic heart slices: 0.22 ± 0.07 mmol/L vs 0.93 ± 0.15 mmol/L; P = .0004). Conclusions We have generated skeletal myoblast–based transplantable grafts that electrically couple to myocardium. PMID:22980065
2011-01-01
Window film should be considered to control heat gain. Skylights when positioned and spaced properly with the proper lens systems, admit more light...per unit area than windows, and distribute the light more evenly over the space. Skylights are mainly recommended in single floor high bay...facilities such as warehouses, hangars, gymnasiums, and big box stores. The optimum material to use for skylights is either glass or acrylic. Double
NASA Technical Reports Server (NTRS)
1989-01-01
Trade studies plans for a number of elements in the Liquid Rocket Booster (LRB) component of the Space Transportation System (STS) are given in viewgraph form. Some of the elements covered include: avionics/flight control; avionics architecture; thrust vector control studies; engine control electronics; liquid rocket propellants; propellant pressurization systems; recoverable spacecraft; cryogenic tanks; and spacecraft construction materials.
2011-07-01
11,674 sq ft C-130 maintenance hangar with reinforced concrete footings, a foundation and footing slab, a structural steel frame, insulated metal...regional farming output significantly; however, it could potentially have a detrimental effect to the lessee. Environmental Justice – There are no...Facility – Construct a pre-engineered one story steel framed structure including the necessary concrete foundations to support the building. SOF
Hynol Process Engineering: Process Configuration, Site Plan, and Equipment Design
1996-02-01
feed stock. Compared with other methanol production processes, direct emissions of carbon dioxide can be substantially reduced by using the Hynol...A bench scale methanol production facility is being constructed to demonstrate the technical feasibility of producing methanol from biomass using the ...Hynol process. The plant is being designed to convert 50 lb./hr of biomass to methanol. The biomass consists of wood, and natural gas is used as a co
Design and construction of an impulse turbine
NASA Astrophysics Data System (ADS)
Hernández, E.
2013-11-01
Impulse turbine has been constructed to be used in the program of Hydraulic Machines, Faculty of Mechanical Engineering at the Universidad Pontificia Bolivariana, sede Bucaramanga. For construction of the impulse turbine (Pelton) detailed plans were drawn up taking into account the design and implementation of the fundamental equations of hydraulic turbomachinery. From the experimental data found maximum mechanical efficiency of 0.6 ± 0.03 for a water flow of 2.1 l/s. The maximum overall efficiency was 0.23 ± 0.02 for a water flow of 0.83 l/s. The design parameter used was a power of 1 kW, as flow regulator built a needle type regulator, which performed well, the model of the bucket or vane is built on a machine type CNC (Computer Numerical Control). For the construction of the impeller and blades was used aluminium because of chemical and physical characteristics and the casing was manufactured in acrylic.
Törner, Marianne; Pousette, Anders
2009-01-01
The often applied engineering approach to safety management in the construction industry needs to be supplemented by organizational measures and measures based on how people conceive and react to their social environment. This requires in-depth knowledge of the broad preconditions for high safety standards in construction. The aim of the study was to comprehensively describe the preconditions and components of high safety standards in the construction industry from the perspective of both experienced construction workers and first-line managers. Five worker safety representatives and 19 first-line managers were interviewed, all strategically selected from within a large Swedish construction project. Phenomenographic methodology was used for data acquisition and analysis and to categorize the information. Nine informants verified the results. The study identified four main categories of work safety preconditions and components: (1) Project characteristics and nature of the work, which set the limits of safety management; (2) Organization and structures, with the subcategories planning, work roles, procedures, and resources; (3) Collective values, norms, and behaviors, with the subcategories climate and culture, and interaction and cooperation; and (4) Individual competence and attitudes, with the subcategories knowledge, ability and experience, and individual attitudes. The results comprehensively describe high safety standards in construction, incorporating organizational, group, individual, and technical aspects. High-quality interaction between different organizational functions and hierarchical levels stood out as important aspects of safety. The results are discussed in relation to previous research into safety and into the social-psychological preconditions for other desired outcomes in occupational settings. The results can guide construction companies in planning and executing construction projects to a high safety standard.
Trends in Transportation Sciences and How to Get a Job in the Industry
NASA Astrophysics Data System (ADS)
Springer, Carl
2010-03-01
Fifty years after the transportation engineering and planning industry began, the skill set of the prototypical professional has shifted radically. At its origins, transportation sciences were purposed to plan and construct a national infrastructure of highway facilities. A typical professional in those days was a civil engineer that narrowed their expertise to roadway design, construction and maintenance. Now, the focus of the profession is much more diverse, encompassing all modes of transport in both rural and urban contexts, and it plays a key role in economic vitality, livability and the environment. This presentation introduces three current trends and discusses their potential influence on the industry and the communities that they serve. First, now that the federal interstate system is largely built, there is great interest in better understanding how the system is really used in metropolitan areas, and how to get better value out of it. This helps professionals to better manage the regional system and its users. Second, the movement towards achieving more sustainable urban planning and design will require better empirical models about why people choose to walk, bike, or drive and how they are influenced by accessibility and land uses. These tools will measure trade-offs in public infrastructure, safety, health and energy consumption. Finally, there is a clear trend for putting transportation data in the public's hands to help them better use and evaluate the systems that are integral to their daily living. Responding to these trends will require new and deeper skills for the transportation professional.
Management self assessment plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Debban, B.L.
Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled tomore » begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.« less
Smith, B R
2009-01-01
Most major cities worldwide face urban water management challenges relating to drinking supply, stormwater and wastewater treatment, and ecological preservation. In light of climate change and finite natural resources, addressing these challenges in sustainable ways will require innovative solutions arising from interdisciplinary collaboration. This article summarizes five major urban water management strategies that bridge the fields of engineering, ecology, landscape architecture, and urban planning. A conceptual implementation of these strategies is demonstrated through a design for a small constructed wetland treatment system in San Francisco, California. The proposed decentralized system described in this article consists of a detention basin, vegetated and open free water surface wetlands, and ultraviolet disinfection. In wet weather, the system would detain and treat combined sewer discharges (CSD), and in dry weather it would treat residential greywater for toilet flushing and irrigation in a nearby neighborhood. It is designed to adapt over time to changing climatic conditions and treatment demands. Importantly, this proposal demonstrates how constructed wetland engineers can incorporate multiple benefits into their systems, offering a vision of how wastewater infrastructure can be an attractive community, educational, recreational, and habitat amenity through the integration of engineering, ecology, and landscape design.
Role of geologist in estimating value of projects and assets
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lankford, S.M.; Nilssen, T.J.; Hill, J.M.
1987-05-01
During this period of depressed oil prices, the economic viability of many capital projects has become marginal at best. When considering new drilling or property acquisition, it is essential that a sound financial analysis be performed. Unless the geologist understands the theoretic basis and operational significance of the engineer's role and the financial concepts, the final evaluation will not be as accurate as it should be. Geologists should understand all of the steps in a property evaluation as they no longer can rely on increasing prices to bail out poor investments. Five essential steps in performing a complete property evaluationmore » are (1) geologic review, (2) engineering review, (3) economic premises, (4) development plan, and (5) financial analysis. It is crucial that the geologist and engineer cooperate in describing the physical and chemical character of the reservoir and the trapped fluids. Only in this way can one be satisfied that the estimated future production stream is maximized yet realistic. Oil in the ground is not reserves unless it can be extracted at a profit. The technical and financial personnel will need to cooperate to determine which proposed wells are economically viable and then to rank them. The construction of the best possible development plan requires input from the financial analyst as well as geologists and engineers. When the best possible development plan has been generated, it is then possible to perform the calculations required to determine the most likely value of a property or decide which new well(s) to drill.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tynan, Mark C.; Russell, Glenn P.; Perry, Frank V.
These associated tables, references, notes, and report present a synthesis of some notable geotechnical and engineering information used to create four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies or disposal facilities 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding “deep underground” facilities, history, activities, and plans. In general, the interactive maps and database provide each facility’s approximate site location, geology, and engineered features (e.g.:more » access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not comprehensive, it is representative of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.« less
The Astrosociology of Space Colonies: Or the Social Construction of Societies in Space
NASA Astrophysics Data System (ADS)
Pass, Jim
2006-01-01
For a number of reasons, the construction of a single space colony represents a future social reality strongly likely to play itself out repeatedly as the twenty-first century advances. As early plans are considered, we must take into account that societies on Earth serve to carry out a variety of life functions and, in so doing, must meet the social needs of their citizens. While the proper engineering/construction of space habitats is necessary to ensure survivability of the inhabitants of a physical environment in space, it remains insufficient to ensure proper functioning of a social environment in space. This paper assumes that the physical environment is adequate to sustain life reliably (that is, to provide life support) and focuses instead on issues related to the sustainability of a society in space from primarily a sociological perspective. The astrosociological argument serving as a central theme here is that we must carefully consider research findings of Earth-based societies and their communities and apply the sociological lessons learned to the planning of space colonies. Moreover, the astrosociological perspective can serve to provide a formal mechanism for collaboration between social scientists and space scientists so that construction of a particular space colony proceeds based on the greatest level of understanding possible.
Study of Collaborative Management for Transportation Construction Project Based on BIM Technology
NASA Astrophysics Data System (ADS)
Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng
2018-03-01
Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.
Construction of the Propulsion Systems Laboratory No. 1 and 2
1951-01-21
Construction of the Propulsion Systems Laboratory No. 1 and 2 at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. When it began operation in late 1952, the Propulsion Systems Laboratory was the NACA’s most powerful facility for testing full-scale engines at simulated flight altitudes. The facility contained two altitude simulating test chambers which were a technological combination of the static sea-level test stands and the complex Altitude Wind Tunnel, which recreated actual flight conditions on a larger scale. NACA Lewis began designing the new facility in 1947 as part of a comprehensive plan to improve the altitude testing capabilities across the lab. The exhaust, refrigeration, and combustion air systems from all the major test facilities were linked. In this way, different facilities could be used to complement the capabilities of one another. Propulsion Systems Laboratory construction began in late summer 1949 with the installation of an overhead exhaust pipe connecting the facility to the Altitude Wind Tunnel and Engine Research Building. The large test section pieces arriving in early 1951, when this photograph was taken. The two primary coolers for the altitude exhaust are in place within the framework near the center of the photograph.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shafer, A.L.; Purdy, S.; Tempelis, D.
The La Paz County Regional Landfill is a 65 hectare (160 acre) municipal waste site located near the western border of Arizona between the cities of Parker and Quartzsite. The site is operated under a public/private partnership between the County of La Paz and Browning-Ferris Industries, Inc. (BFI). The County owns the landfill and infrastructure and BFI is responsible for facility improvements, environmental compliance, and daily operations. Following the initial permitting and construction of the first landfill cell, a value engineering review was conducted on the site design and permit requirements. Based on this review, substantial cost saving opportunities weremore » identified. In order to implement the value engineering ideas, the site permit was modified and a new Solid Waste Facilities Plan was Submitted to the Arizona Department of Environmental Quality. This paper discusses the value engineering modifications that were conducted, the revisions to the permits, and the relative cost savings that were realized. The areas addressed include the liner system design, closure design, disposal capacity, and operations plan. Through the use of alternative liners a cost savings of well over 50 percent (as compared to the original permit) will be realized over the life of the landfill.« less
Civil engineering reference guide
DOE Office of Scientific and Technical Information (OSTI.GOV)
Merritt, F.S.
1986-01-01
The civil engineering reference guide contains the following: Structural theory. Structural steel design. Concrete design and construction. Wood design and construction. Bridge engineering. Geotechnical engineering. Water engineering. Environmental engineering. Surveying.
22 CFR 228.17 - Special procurement rules for construction and engineering services.
Code of Federal Regulations, 2012 CFR
2012-04-01
... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...
22 CFR 228.17 - Special procurement rules for construction and engineering services.
Code of Federal Regulations, 2013 CFR
2013-04-01
... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...
22 CFR 228.17 - Special procurement rules for construction and engineering services.
Code of Federal Regulations, 2014 CFR
2014-04-01
... engineering services. 228.17 Section 228.17 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES FOR... construction and engineering services. Advanced developing countries, as defined in § 228.01, which USAID has... engineering services are not eligible to furnish USAID-financed construction and engineering services unless...
1982-09-01
Eufaula Lake, the largest body of water in Oklahoma, extends into McIntosh, Haskell, Pittsburg and Olwiulgee counties , Oklahoma. Construction of the...TABLES iv LIST OF FIGURES vii PROJECT PERSONNEL viii INTRODUCTION 1 Location I Authorization 1 Physical Features 3 Area Description 4 WILDLIFE RESULTS AND...TableLa I Eufaula Lake Project. Summary of pertinent physical 4 characteristics. 2 Eufaula Project. Comparison of terrestrial habitat 9 affected by
Building the interspace: Digital library infrastructure for a University Engineering Community
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schatz, B.
A large-scale digital library is being constructed and evaluated at the University of Illinois, with the goal of bringing professional search and display to Internet information services. A testbed planned to grow to 10K documents and 100K users is being constructed in the Grainger Engineering Library Information Center, as a joint effort of the University Library and the National Center for Supercomputing Applications (NCSA), with evaluation and research by the Graduate School of Library and Information Science and the Department of Computer Science. The electronic collection will be articles from engineering and science journals and magazines, obtained directly from publishersmore » in SGML format and displayed containing all text, figures, tables, and equations. The publisher partners include IEEE Computer Society, AIAA (Aerospace Engineering), American Physical Society, and Wiley & Sons. The software will be based upon NCSA Mosaic as a network engine connected to commercial SGML displayers and full-text searchers. The users will include faculty/students across the midwestern universities in the Big Ten, with evaluations via interviews, surveys, and transaction logs. Concurrently, research into scaling the testbed is being conducted. This includes efforts in computer science, information science, library science, and information systems. These efforts will evaluate different semantic retrieval technologies, including automatic thesaurus and subject classification graphs. New architectures will be designed and implemented for a next generation digital library infrastructure, the Interspace, which supports interaction with information spread across information spaces within the Net.« less
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2010 CFR
2010-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2012 CFR
2012-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2011 CFR
2011-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2013 CFR
2013-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
Research on the spatial analysis method of seismic hazard for island
NASA Astrophysics Data System (ADS)
Jia, Jing; Jiang, Jitong; Zheng, Qiuhong; Gao, Huiying
2017-05-01
Seismic hazard analysis(SHA) is a key component of earthquake disaster prevention field for island engineering, whose result could provide parameters for seismic design microscopically and also is the requisite work for the island conservation planning’s earthquake and comprehensive disaster prevention planning macroscopically, in the exploitation and construction process of both inhabited and uninhabited islands. The existing seismic hazard analysis methods are compared in their application, and their application and limitation for island is analysed. Then a specialized spatial analysis method of seismic hazard for island (SAMSHI) is given to support the further related work of earthquake disaster prevention planning, based on spatial analysis tools in GIS and fuzzy comprehensive evaluation model. The basic spatial database of SAMSHI includes faults data, historical earthquake record data, geological data and Bouguer gravity anomalies data, which are the data sources for the 11 indices of the fuzzy comprehensive evaluation model, and these indices are calculated by the spatial analysis model constructed in ArcGIS’s Model Builder platform.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, Carl J.
2004-07-13
BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less
Reducing acquisition risk through integrated systems of systems engineering
NASA Astrophysics Data System (ADS)
Gross, Andrew; Hobson, Brian; Bouwens, Christina
2016-05-01
In the fall of 2015, the Joint Staff J7 (JS J7) sponsored the Bold Quest (BQ) 15.2 event and conducted planning and coordination to combine this event into a joint event with the Army Warfighting Assessment (AWA) 16.1 sponsored by the U.S. Army. This multipurpose event combined a Joint/Coalition exercise (JS J7) with components of testing, training, and experimentation required by the Army. In support of Assistant Secretary of the Army for Acquisition, Logistics, and Technology (ASA(ALT)) System of Systems Engineering and Integration (SoSE&I), Always On-On Demand (AO-OD) used a system of systems (SoS) engineering approach to develop a live, virtual, constructive distributed environment (LVC-DE) to support risk mitigation utilizing this complex and challenging exercise environment for a system preparing to enter limited user test (LUT). AO-OD executed a requirements-based SoS engineering process starting with user needs and objectives from Army Integrated Air and Missile Defense (AIAMD), Patriot units, Coalition Intelligence, Surveillance and Reconnaissance (CISR), Focused End State 4 (FES4) Mission Command (MC) Interoperability with Unified Action Partners (UAP), and Mission Partner Environment (MPE) Integration and Training, Tactics and Procedures (TTP) assessment. The SoS engineering process decomposed the common operational, analytical, and technical requirements, while utilizing the Institute of Electrical and Electronics Engineers (IEEE) Distributed Simulation Engineering and Execution Process (DSEEP) to provide structured accountability for the integration and execution of the AO-OD LVC-DE. As a result of this process implementation, AO-OD successfully planned for, prepared, and executed a distributed simulation support environment that responsively satisfied user needs and objectives, demonstrating the viability of an LVC-DE environment to support multiple user objectives and support risk mitigation activities for systems in the acquisition process.
The Full Scale Seal Experiment - A Seal Industrial Prototype for Cigeo - 13106
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lebon, P.; Bosgiraud, J.M.; Foin, R.
2013-07-01
The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the Cigeo (the French Deep Geological Repository) Project development, to demonstrate the technical construction feasibility and performance of seals to be constructed, at time of Repository components (shafts, ramps, drifts, disposal vaults) progressive closure. FSS is built inside a drift model fabricated on surface for the purpose. Prior to the scale 1:1 seal construction test, various design tasks are scheduled. They include the engineering work on the drift model to make it fit with the experimental needs, on the various work sequencesmore » anticipated for the swelling clay core emplacement and the concrete containment plugs construction, on the specialized handling tools (and installation equipment) manufactured and delivered for the purpose, and of course on the various swelling clay materials and low pH (below 11) concrete formulations developed for the application. The engineering of the 'seal-as-built' commissioning means (tools and methodology) must also be dealt with. The FSS construction experiment is a technological demonstrator, thus it is not focused on the phenomenological survey (and by consequence, on the performance and behaviour forecast). As such, no hydration (forced or natural) is planned. However, the FSS implementation (in particular via the construction and commissioning activities carried out) is a key milestone in view of comforting phenomenological extrapolation in time and scale. The FSS experiment also allows for qualifying the commissioning methods of a real sealing system in the Repository, as built, at time of industrial operations. (authors)« less
Quaternary Geologic Map of the Regina 4 Degrees x 6 Degrees Quadrangle, United States and Canada
Fullerton, David S.; Christiansen, Earl A.; Schreiner, Bryan T.; Colton, Roger B.; Clayton, Lee; Bush, Charles A.; Fullerton, David S.
2007-01-01
For scientific purposes, the map differentiates Quaternary surficial deposits and materials on the basis of clast lithology or composition, matrix texture or particle size, structure, genesis, stratigraphic relations, engineering geologic properties, and relative age, as shown on the correlation diagram and indicated in the 'Description of Map Units'. Deposits of some constructional landforms, such as end moraines, are distinguished as map units. Deposits of erosional landforms, such as outwash terraces, are not distinguished, although glaciofluvial, ice-contact, fluvial, and lacustrine deposits that are mapped may be terraced. Differentiation of sequences of fluvial and glaciofluvial deposits at this scale is not possible. For practical purposes, the map is a surficial materials map. Materials are distinguished on the basis of lithology or composition, texture or particle size, and other physical, chemical, and engineering characteristics. It is not a map of soils that are recognized and classified in pedology or agronomy. Rather, it is a generalized map of soils as recognized in engineering geology, or of substrata or parent materials in which pedologic or agronomic soils are formed. As a materials map, it serves as a base from which a variety of maps for use in planning engineering, land-use planning, or land-management projects can be derived and from which a variety of maps relating to earth surface processes and Quaternary geologic history can be derived.
The MUSES Satellite Team and Multidisciplinary System Engineering
NASA Technical Reports Server (NTRS)
Chen, John C.; Paiz, Alfred R.; Young, Donald L.
1997-01-01
In a unique partnership between three minority-serving institutions and NASA's Jet Propulsion Laboratory, a new course sequence, including a multidisciplinary capstone design experience, is to be developed and implemented at each of the schools with the ambitious goal of designing, constructing and launching a low-orbit Earth-resources satellite. The three universities involved are North Carolina A&T State University (NCA&T), University of Texas, El Paso (UTEP), and California State University, Los Angeles (CSULA). The schools form a consortium collectively known as MUSES - Minority Universities System Engineering and Satellite. Four aspects of this project make it unique: (1) Including all engineering disciplines in the capstone design course, (2) designing, building and launching an Earth-resources satellite, (3) sustaining the partnership between the three schools to achieve this goal, and (4) implementing systems engineering pedagogy at each of the three schools. This paper will describe the partnership and its goals, the first design of the satellite, the courses developed at NCA&T, and the implementation plan for the course sequence.
Toso, Francesco; Zuiani, Chiara; Vergendo, Maurizio; Salvo, Iolanda; Robiony, Massimo; Politi, Massimo; Bazzocchi, Massimo
2005-01-01
To validate a protocol for creating virtual models to be used in the construction of solid prototypes useful for the planning-simulation of maxillo-facial surgery, in particular for very complex anatomic and pathologic problems. To optimize communications between the radiology, engineering and surgical laboratories. We studied 16 patients with different clinical problems of the maxillo-facial district. Exams were performed with multidetector computed tomography (MDCT) and single slice computed tomography (SDCT) with axial scans and collimation of 0.5-2 mm, and reconstruction interval of 1 mm. Subsequently we performed 2D multiplanar reconstructions and 3D volume-rendering reconstructions. We exported the DICOM images to the engineering laboratory, to recognize and isolate the bony structures by software. With these data the solid prototypes were generated using stereolitography. To date, surgery has been preformed on 12 patients after simulation of the procedure on the stereolithographyc model. The solid prototypes constructed in the difficult cases were sufficiently detailed despite problems related to the artefacts generated by dental fillings an d prostheses. In the remaining cases the MPR/3D images were sufficiently detailed for surgical planning. The surgical results were excellent in all patients who underwent surgery, and the surgeons were satisfied with the improvement in quality and the reduction in time required for the procedure. MDCT enables rapid prototyping using solid replication, which was very helpful in maxillo-facial surgery, despite problems related to artifacts due to dental fillings and prosthesis within the acquisition field; solutions for this problem are work in progress. The protocol used for communication between the different laboratories was valid and reproducible.
48 CFR 31.201-7 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...
48 CFR 31.201-7 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...
48 CFR 31.201-7 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...
48 CFR 31.201-7 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...
48 CFR 31.201-7 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-engineer contracts. 31.201-7 Section 31.201-7 Federal Acquisition Regulations System FEDERAL ACQUISITION... Organizations 31.201-7 Construction and architect-engineer contracts. Specific principles and procedures for... architect-engineer contracts related to construction projects, are in 31.105. The applicability of these...
1976-01-01
projects were authorized pertaining to the Birds Point New Madrid Floodway and to Reelfoot Lake m Northwest Tennessee. For several years, residents of the...levee grade; and the construction of a floodgate for the release of interior drainage. 62 Long range plans for improvement of the Reelfoot Lake area...river traffic on western waters than on the Great Lakes and on the Atlantic Coast combined. 2 7 The daring river captains became the most respected
Spacelab: An international short-stay orbiting laboratory
NASA Technical Reports Server (NTRS)
Froehlich, W.
1983-01-01
Spacelab was planned and constructed to serve as a suitable host for significant scientific research and technological development. As intended by its European builders and by its American operators, this new facility will serve scientists from many nations and in many scientific disciplines and technological specialties. Spacelab is the outgrowth of steady evolution of space technology. It enables scientists and engineers to go into space for in-orbit research with their own hands and eye-with instruments they have designed and built.
2011-04-01
privatization of the water and natural gas systems and other utility systems , construction of the William B. Jones building, and the creation of...at the Upper Marlboro Branch Library of the Prince George’s County Memorial Library System at 14 730 Main St. Upper Marlboro, MD 20772 and on the...Wing 113 WG 113th Wing 316 WG 316th Wing 459 ARW 459th Air Refueling Wing AAM Annual Arithmetic Mean ACES Automated Civil Engineering System ADP
1976-01-01
consist of Daguerre Point Dam, which forms a storage basin for debris, and some fifteen miles of training walls de- signed to keep the river within...obtaining up to the date of passage of this act owners of property anywhere in the basin were at liberty to reclaim practically as they pleased, with...Yolo Basin some 21 miles of the east levee had been constructed, and another twenty miles had been planned and approved. When completed, about forty
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
30 CFR 36.23 - Engine intake system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...
30 CFR 36.23 - Engine intake system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...
Accelerator boom hones China's engineering expertise
NASA Astrophysics Data System (ADS)
Normile, Dennis
2018-02-01
In raising the curtain on the China Spallation Neutron Source, China has joined just four other nations in having mastered the technology of accelerating and controlling beams of protons. The $277 million facility, set to open to users this spring in Dongguan, is expected to yield big dividends in materials science, chemistry, and biology. More world class machines are on the way, as China this year starts construction on four other major accelerator facilities. The building boom is prompting a scramble to find enough engineers and technicians to finish the projects. But if they all come off as planned, the facilities would position China to tackle the next global megaproject: a giant accelerator that would pick up where Europe's Large Hadron Collider leaves off.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1982-09-01
This report is a summary of the Energy Engineering Analysis for the Milan Army Ammunition Plant (MAAP) in Milan, Tennessee. It includes the recommendations for the development of a Basewide Energy Plan consisting of energy conservation projects and other recommendations for reduction of the installation`s 1985 source energy consumption. Milan Army Ammunition Plant, containing 22,541 acres, is situated in both Gibson and Carroll Counties, Tennessee, and is approximately equally divided longitudinally into the two counties. The Milan area experiences typically short mild winters and long warm summers. With the exception of a few modernized facilities, the overwhelming majority of buildingsmore » at MAAP were constructed for World War II ammunition production.« less
Nemoto, Hitoshi; Watson, Deborah; Masuda, Koichi
2015-01-01
Tissue engineering holds great promise for cartilage repair with minimal donor-site morbidity. The in vivo maturation of a tissue-engineered construct can be tested in the subcutaneous tissues of the same species for autografts or of immunocompromised animals for allografts or xenografts. This section describes detailed protocols for the surgical transplantation of a tissue-engineered construct into an animal model to assess construct validity.
Community Meeting to Focus on NREL Construction Plans
Community Meeting to Focus on NREL Construction Plans For more information contact: Kerry Masson issues including planned construction projects on NREL's 300-acre campus. Construction plans include
The Global Experience of Deployment of Energy-Efficient Technologies in High-Rise Construction
NASA Astrophysics Data System (ADS)
Potienko, Natalia D.; Kuznetsova, Anna A.; Solyakova, Darya N.; Klyueva, Yulia E.
2018-03-01
The objective of this research is to examine issues related to the increasing importance of energy-efficient technologies in high-rise construction. The aim of the paper is to investigate modern approaches to building design that involve implementation of various energy-saving technologies in diverse climates and at different structural levels, including the levels of urban development, functionality, planning, construction and engineering. The research methodology is based on the comprehensive analysis of the advanced global expertise in the design and construction of energy-efficient high-rise buildings, with the examination of their positive and negative features. The research also defines the basic principles of energy-efficient architecture. Besides, it draws parallels between the climate characteristics of countries that lead in the field of energy-efficient high-rise construction, on the one hand, and the climate in Russia, on the other, which makes it possible to use the vast experience of many countries, wholly or partially. The paper also gives an analytical review of the results arrived at by implementing energy efficiency principles into high-rise architecture. The study findings determine the impact of energy-efficient technologies on high-rise architecture and planning solutions. In conclusion, the research states that, apart from aesthetic and compositional interpretation of architectural forms, an architect nowadays has to address the task of finding a synthesis between technological and architectural solutions, which requires knowledge of advanced technologies. The study findings reveal that the implementation of modern energy-efficient technologies into high-rise construction is of immediate interest and is sure to bring long-term benefits.
Performance Probability Distributions for Sediment Control Best Management Practices
NASA Astrophysics Data System (ADS)
Ferrell, L.; Beighley, R.; Walsh, K.
2007-12-01
Controlling soil erosion and sediment transport can be a significant challenge during the construction process due to the extent and conditions of bare, disturbed soils. Best Management Practices (BMPs) are used as the framework for the design of sediment discharge prevention systems in stormwater pollution prevention plans which are typically required for construction sites. This research focuses on commonly-used BMP systems for perimeter control of sediment export: silt fences and fiber rolls. Although these systems are widely used, the physical and engineering parameters describing their performance are not well understood. Performance expectations are based on manufacturer results, but due to the dynamic conditions that exist on a construction site performance expectations are not always achievable in the field. Based on experimental results product performance is shown to be highly variable. Experiments using the same installation procedures show inconsistent sediment removal performances ranging from (>)85 percent to zero. The goal of this research is to improve the determination of off-site sediment yield based on probabilistic performance results of perimeter control BMPs. BMPs are evaluated in the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with a soil depth of 0.5 meters and a slope of 33 percent. The simulated storm event consists of 17 mm/hr for 20 minutes followed by 51 mm/hr for 30 minutes. The storm event is based on an ASTM design storm intended to simulate BMP failures. BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, less than optimal installations, and no treatment conditions. Preliminary results from 30 experiments are presented and used to develop probability distributions for BMP sediment removal efficiencies. The results are then combined with spatial and temporal distributions of perimeter sediment loadings for a construction site to estimate the time dependent risk of off-site sediment discharge over the duration of a project (ex., 0, 25, 50, 75 and 100 percent complete). The results are used to highlight the importance of considering all phases of construction when developing stormwater pollution prevention plans.
46 CFR 107.305 - Plans and information.
Code of Federal Regulations, 2013 CFR
2013-10-01
... systems. Marine Engineering (z) Plans required for marine engineering equipment and systems by Subchapter F of this chapter. Electrical Engineering (aa) Plans required for electrical engineering equipment... materials that do not conform to ABS or ASTM specifications, complete specifications, including chemical and...
Minimizing delays in the Jordanian construction industry by adopting BIM technology
NASA Astrophysics Data System (ADS)
Btoush, M.; Harun, A. T.
2017-11-01
The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist.
3D bioprinting of biomimetic aortic vascular constructs with self-supporting cells.
Kucukgul, Can; Ozler, S Burce; Inci, Ilyas; Karakas, Ezgi; Irmak, Ster; Gozuacik, Devrim; Taralp, Alpay; Koc, Bahattin
2015-04-01
Cardiovascular diseases are the leading cause of deaths throughout the world. Vascular diseases are mostly treated with autografts and blood vessel transplantations. However, traditional grafting methods have several problems including lack of suitable harvest sites, additional surgical costs for harvesting procedure, pain, infection, lack of donors, and even no substitutes at all. Recently, tissue engineering and regenerative medicine approaches are used to regenerate damaged or diseased tissues. Most of the tissue engineering investigations have been based on the cell seeding into scaffolds by providing a suitable environment for cell attachment, proliferation, and differentiation. Because of the challenges such as difficulties in seeding cells spatially, rejection, and inflammation of biomaterials used, the recent tissue engineering studies focus on scaffold-free techniques. In this paper, the development of novel computer aided algorithms and methods are developed for 3D bioprinting of scaffold-free biomimetic macrovascular structures. Computer model mimicking a real human aorta is generated using imaging techniques and the proposed computational algorithms. An optimized three-dimensional bioprinting path planning are developed with the proposed self-supported model. Mouse embryonic fibroblast (MEF) cell aggregates and support structures (hydrogels) are 3D bioprinted layer-by-layer according to the proposed self-supported method to form an aortic tissue construct. © 2014 Wiley Periodicals, Inc.
Production of heavy water in India
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fareeduddin, S.
From symposium on nuclear science and engineering; Bombay, India (13 Mar 1973). To meet the requirements of heavy water for the power reactors now under construction and those being planned, a program for providing adequate production capacity has been started. Various processes have been surveyed and the factors which have been considered in the choice of the processes adopted in India are presented. The H/sub 2/S--H/sub 2/0 exchange process adopted for the plant being set up at Kota and the ammoria--hydrogen exchange process adopted for the Baroda plant are briefly described. The status of the various plants under construction hasmore » been presented. The operating experience of the Nangal plant during the last ten years is included. (auth)« less
48 CFR 952.236 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction and architect-engineer contracts. 952.236 Section 952.236 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Construction and architect-engineer contracts. ...
48 CFR 952.236 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Construction and architect-engineer contracts. 952.236 Section 952.236 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Construction and architect-engineer contracts. ...
48 CFR 952.236 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Construction and architect-engineer contracts. 952.236 Section 952.236 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Construction and architect-engineer contracts. ...
48 CFR 952.236 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Construction and architect-engineer contracts. 952.236 Section 952.236 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Construction and architect-engineer contracts. ...
48 CFR 952.236 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Construction and architect-engineer contracts. 952.236 Section 952.236 Federal Acquisition Regulations System DEPARTMENT OF ENERGY... Construction and architect-engineer contracts. ...
30 CFR 285.620 - What is a Construction and Operations Plan (COP)?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...
Using AI and Semantic Web Technologies to attack Process Complexity in Open Systems
NASA Astrophysics Data System (ADS)
Thompson, Simon; Giles, Nick; Li, Yang; Gharib, Hamid; Nguyen, Thuc Duong
Recently many vendors and groups have advocated using BPEL and WS-BPEL as a workflow language to encapsulate business logic. While encapsulating workflow and process logic in one place is a sensible architectural decision the implementation of complex workflows suffers from the same problems that made managing and maintaining hierarchical procedural programs difficult. BPEL lacks constructs for logical modularity such as the requirements construct from the STL [12] or the ability to adapt constructs like pure abstract classes for the same purpose. We describe a system that uses semantic web and agent concepts to implement an abstraction layer for BPEL based on the notion of Goals and service typing. AI planning was used to enable process engineers to create and validate systems that used services and goals as first class concepts and compiled processes at run time for execution.
System engineering and science projects: lessons from MeerKAT
NASA Astrophysics Data System (ADS)
Kapp, Francois
2016-08-01
The Square Kilometre Array (SKA) is a large science project planning to commence construction of the world's largest Radio Telescope after 2018. MeerKAT is one of the precursor projects to the SKA, based on the same site that will host the SKA Mid array in the central Karoo area of South Africa. From the perspective of signal processing hardware development, we analyse the challenges that MeerKAT encountered and extrapolate them to SKA in order to prepare the System Engineering and Project Management methods that could contribute to a successful completion of SKA. Using the MeerKAT Digitiser, Correlator/Beamformer and Time and Frequency Reference Systems as an example, we will trace the risk profile and subtle differences in engineering approaches of these systems over time and show the effects of varying levels of System Engineering rigour on the evolution of their risk profiles. It will be shown that the most rigorous application of System Engineering discipline resulted in the most substantial reduction in risk over time. Since the challenges faced by SKA are not limited to that of MeerKAT, we also look into how that translates to a system development where there is substantial complexity in both the created system as well as the creating system. Since the SKA will be designed and constructed by consortia made up from the ten member countries, there are many additional complexities to the organisation creating the system - a challenge the MeerKAT project did not encounter. Factors outside of engineering, for instance procurement models and political interests, also play a more significant role, and add to the project risks of SKA when compared to MeerKAT.
NASA Technical Reports Server (NTRS)
Sakata, I. F.; Ostrom, R. B.; Cardinale, S. V.
1978-01-01
The effort required by commercial transport manufacturers to accomplish the transition from current construction materials and practices to extensive use of composites in aircraft wings was investigated. The engineering and manufacturing disciplines which normally participate in the design, development, and production of an aircraft were employed to ensure that all of the factors that would enter a decision to commit to production of a composite wing structure were addressed. A conceptual design of an advanced technology reduced energy aircraft provided the framework for identifying and investigating unique design aspects. A plan development effort defined the essential technology needs and formulated approaches for effecting the required wing development. The wing development program plans, resource needs, and recommendations are summarized.
NASA Technical Reports Server (NTRS)
Bair, E. K.
1986-01-01
The System Trades Study and Design Methodology Plan is used to conduct trade studies to define the combination of Space Shuttle Main Engine features that will optimize candidate engine configurations. This is accomplished by using vehicle sensitivities and engine parametric data to establish engine chamber pressure and area ratio design points for candidate engine configurations. Engineering analyses are to be conducted to refine and optimize the candidate configurations at their design points. The optimized engine data and characteristics are then evaluated and compared against other candidates being considered. The Evaluation Criteria Plan is then used to compare and rank the optimized engine configurations on the basis of cost.
Evaluation of Hybrid Learning in a Construction Engineering Context: A Mixed-Method Approach
ERIC Educational Resources Information Center
Karabulut-Ilgu, Aliye; Jahren, Charles
2016-01-01
Engineering educators call for a widespread implementation of hybrid learning to respond to rapidly changing demands of the 21st century. In response to this call, a junior-level course in the Construction Engineering program entitled Construction Equipment and Heavy Construction Methods was converted into a hybrid learning model. The overarching…
46 CFR 127.110 - Plans and specifications required for new construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2014-10-01 2014-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...
46 CFR 127.110 - Plans and specifications required for new construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2012-10-01 2012-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...
46 CFR 127.110 - Plans and specifications required for new construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2013-10-01 2013-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...
Carlier, Aurélie; Skvortsov, Gözde Akdeniz; Hafezi, Forough; Ferraris, Eleonora; Patterson, Jennifer; Koç, Bahattin; Van Oosterwyck, Hans
2016-05-17
Three-dimensional (3D) bioprinting is a rapidly advancing tissue engineering technology that holds great promise for the regeneration of several tissues, including bone. However, to generate a successful 3D bone tissue engineering construct, additional complexities should be taken into account such as nutrient and oxygen delivery, which is often insufficient after implantation in large bone defects. We propose that a well-designed tissue engineering construct, that is, an implant with a specific spatial pattern of cells in a matrix, will improve the healing outcome. By using a computational model of bone regeneration we show that particular cell patterns in tissue engineering constructs are able to enhance bone regeneration compared to uniform ones. We successfully bioprinted one of the most promising cell-gradient patterns by using cell-laden hydrogels with varying cell densities and observed a high cell viability for three days following the bioprinting process. In summary, we present a novel strategy for the biofabrication of bone tissue engineering constructs by designing cell-gradient patterns based on a computational model of bone regeneration, and successfully bioprinting the chosen design. This integrated approach may increase the success rate of implanted tissue engineering constructs for critical size bone defects and also can find a wider application in the biofabrication of other types of tissue engineering constructs.
ERIC Educational Resources Information Center
Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.
On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in industrial engineering and systems design. Recommendations for doctoral work in engineering studies are presented.…
78 FR 77334 - Small Business Size Standards: Construction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-23
... Dredging and Surface Cleanup Activities, an ``exception'' under Other Heavy and Civil Engineering... ``exception'' under Other Heavy and Civil Engineering Construction (NAICS 238910), from $20 million to $30... exception under Other Heavy and Civil Engineering Construction (NAICS 238910) and retain the current size...
1982-05-01
Chmpip. tL : Construction engineering Research Laboratory ; available from NTIS. 1982. 71 p. (Technical report / Construction Engineering Researsh ...AD-Al17 661 CONSTRUCTION ENGINEERING RESEARCH LAB (ARMY) CHAMPAIGN IL F/G 5/3 ECONOMIC IMPACT FORECAST SYSTEM (EIFS). VERSION 2.0. USERS MANU--ETC(u...CONSTRUCTION ENGINEERING RESEARCH LABORATORY 4A762720A896-C-004 P.O. BOX 4005, CHAMPAIGN, IL 61820 I. CONTROLLING OFFICE NAME AND ADDRESS It. REPORT
Can health promotion model constructs predict nutritional behavior among diabetic patients?
Mohebi, Siamak; Sharifirad, Ghlamreza; Feizi, Avat; Botlani, Saeedeh; Hozori, Mohammad; Azadbakht, Leila
2013-01-01
Since, the nutritional behavior is a complicated process in which various factors play the role, this study aimed at specifying the effective factors in nutritional behavior of diabetic patients based on Health Promotion Model. This paper reviews the published articles from 2000 to the beginning of 2012, using the various data banks and search engines such as PubMed, ProQuest, Scopus, Elsevier, and the key words" perceived benefits and barriers, perceived self-efficacy, social support, activity related affect, situational influences, commitment to plan of action, immediate competing demands and diabetes, self-caring and diabetes. Unfavorable self-care situation especially, inappropriate nutritional behavior is related to some effective modifiable factors. Perceived benefits and self-efficacy regarding behaviors play a major role in the nutritional behaviors. Social support especially, spouses’ support has a significant role in this regard. Moreover, there is a reverse relationship between perceived barriers and nutritional self-care. In addition, behavioral feelings, situational influences, commitment to plan of action and immediate competing demands and preferences can also impact and overshadow the nutritional self-care. Following the relationship between constructs of Health Promotion Model and nutritional behavior the constructs of this model can be utilized as the basis for educational intervention among diabetes. PMID:24124436
Virtual manufacturing work cell for engineering
NASA Astrophysics Data System (ADS)
Watanabe, Hideo; Ohashi, Kazushi; Takahashi, Nobuyuki; Kato, Kiyotaka; Fujita, Satoru
1997-12-01
The life cycles of products have been getting shorter. To meet this rapid turnover, manufacturing systems must be frequently changed as well. In engineering to develop manufacturing systems, there are several tasks such as process planning, layout design, programming, and final testing using actual machines. This development of manufacturing systems takes a long time and is expensive. To aid the above engineering process, we have developed the virtual manufacturing workcell (VMW). This paper describes a concept of VMW and design method through computer aided manufacturing engineering using VMW (CAME-VMW) related to the above engineering tasks. The VMW has all design data, and realizes a behavior of equipment and devices using a simulator. The simulator has logical and physical functionality. The one simulates a sequence control and the other simulates motion control, shape movement in 3D space. The simulator can execute the same control software made for actual machines. Therefore we can verify the behavior precisely before the manufacturing workcell will be constructed. The VMW creates engineering work space for several engineers and offers debugging tools such as virtual equipment and virtual controllers. We applied this VMW to development of a transfer workcell for vaporization machine in actual manufacturing system to produce plasma display panel (PDP) workcell and confirmed its effectiveness.
Systems Engineering and Integration for Technology Programs
NASA Technical Reports Server (NTRS)
Kennedy, Kruss J.
2006-01-01
The Architecture, Habitability & Integration group (AH&I) is a system engineering and integration test team within the NASA Crew and Thermal Systems Division (CTSD) at Johnson Space Center. AH&I identifies and resolves system-level integration issues within the research and technology development community. The timely resolution of these integration issues is fundamental to the development of human system requirements and exploration capability. The integration of the many individual components necessary to construct an artificial environment is difficult. The necessary interactions between individual components and systems must be approached in a piece-wise fashion to achieve repeatable results. A formal systems engineering (SE) approach to define, develop, and integrate quality systems within the life support community has been developed. This approach will allow a Research & Technology Program to systematically approach the development, management, and quality of technology deliverables to the various exploration missions. A tiered system engineering structure has been proposed to implement best systems engineering practices across all development levels from basic research to working assemblies. These practices will be implemented through a management plan across all applicable programs, projects, elements and teams. While many of the engineering practices are common to other industries, the implementation is specific to technology development. An accounting of the systems engineering management philosophy will be discussed and the associated programmatic processes will be presented.
48 CFR 853.236 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Construction and architect-engineer contracts. 853.236 Section 853.236 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CLAUSES AND FORMS FORMS Prescription of Forms 853.236 Construction and architect-engineer...
48 CFR 853.236 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Construction and architect-engineer contracts. 853.236 Section 853.236 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CLAUSES AND FORMS FORMS Prescription of Forms 853.236 Construction and architect-engineer...
48 CFR 853.236 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction and architect-engineer contracts. 853.236 Section 853.236 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CLAUSES AND FORMS FORMS Prescription of Forms 853.236 Construction and architect-engineer...
48 CFR 853.236 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Construction and architect-engineer contracts. 853.236 Section 853.236 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CLAUSES AND FORMS FORMS Prescription of Forms 853.236 Construction and architect-engineer...
48 CFR 853.236 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Construction and architect-engineer contracts. 853.236 Section 853.236 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CLAUSES AND FORMS FORMS Prescription of Forms 853.236 Construction and architect-engineer...
Code of Federal Regulations, 2010 CFR
2010-01-01
... STANDARDS: AIRCRAFT ENGINES Design and Construction; Reciprocating Aircraft Engines § 33.31 Applicability. This subpart prescribes additional design and construction requirements for reciprocating aircraft engines. ...
Code of Federal Regulations, 2011 CFR
2011-01-01
... STANDARDS: AIRCRAFT ENGINES Design and Construction; Reciprocating Aircraft Engines § 33.31 Applicability. This subpart prescribes additional design and construction requirements for reciprocating aircraft engines. ...
Code of Federal Regulations, 2013 CFR
2013-01-01
... STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.61 Applicability. This subpart prescribes additional design and construction requirements for turbine aircraft engines. ...
Code of Federal Regulations, 2012 CFR
2012-01-01
... STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.61 Applicability. This subpart prescribes additional design and construction requirements for turbine aircraft engines. ...
Code of Federal Regulations, 2014 CFR
2014-01-01
... STANDARDS: AIRCRAFT ENGINES Design and Construction; Turbine Aircraft Engines § 33.61 Applicability. This subpart prescribes additional design and construction requirements for turbine aircraft engines. ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goodson, J.O.
This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world's first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC's CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goodson, J.O.
This is the first of three volumes which document the historical development of the first US compressed-air energy storage (CAES) Power-generation facility. Volume 1 is a background report and presents a chronicle of the development of the CAES facility from the early interest in CAES until inception of engineering/construction on August 11, 1988. The 110 MW - 26 hr CAES plant is owned and operated by Alabama Electric Cooperative, Inc. (AEC) of Andalusia, Alabama. The plant is the first CAES plant in the United States and the world`s first CAES facility incorporating a recuperator to improve efficiency. The plant suppliesmore » competitively priced peaking power to the AEC owner members. The economics of CAES-produced power is attractive because the energy-intensive air-compression mode is powered by relatively inexpensive base-load power external to the CAES plant. The compressed-air energy is stored underground until needed, and during the power-production mode, the only fuel required is that to heat the compressed air to expander-inlet temperature. The project development for AEC`s CAES plant involved much planning and preliminary design work. Specifically, this included load and generation-planning studies, power-supply selections, conceptual designs, project administration, air-storage cavern and turbomachinery specifications and design, contract requirements, environmental and licensing issues, and construction planning.« less
Social cost impact assessment of pipeline infrastructure projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, John C., E-mail: matthewsj@battelle.org; Allouche, Erez N., E-mail: allouche@latech.edu; Sterling, Raymond L., E-mail: sterling@latech.edu
A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databasesmore » can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dave Madsen
This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less
The High Field Path to Practical Fusion Energy
NASA Astrophysics Data System (ADS)
Mumgaard, Robert; Whyte, D.; Greenwald, M.; Hartwig, Z.; Brunner, D.; Sorbom, B.; Marmar, E.; Minervini, J.; Bonoli, P.; Irby, J.; Labombard, B.; Terry, J.; Vieira, R.; Wukitch, S.
2017-10-01
We propose a faster, lower cost development path for fusion energy enabled by high temperature superconductors, devices at high magnetic field, innovative technologies and modern approaches to technology development. Timeliness, scale, and economic-viability are the drivers for fusion energy to combat climate change and aid economic development. The opportunities provided by high-temperature superconductors, innovative engineering and physics, and new organizational structures identified over the last few years open new possibilities for realizing practical fusion energy that could meet mid-century de-carbonization needs. We discuss re-factoring the fusion energy development path with an emphasis on concrete risk retirement strategies utilizing a modular approach based on the high-field tokamak that leverages the broader tokamak physics understanding of confinement, stability, and operational limits. Elements of this plan include development of high-temperature superconductor magnets, simplified immersion blankets, advanced long-leg divertors, a compact divertor test tokamak, efficient current drive, modular construction, and demountable magnet joints. An R&D plan culminating in the construction of an integrated pilot plant and test facility modeled on the ARC concept is presented.
Technical Basis of Scaling Relationships for the Pretreatment Engineering Platform
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuhn, William L.; Arm, Stuart T.; Huckaby, James L.
Pacific Northwest National Laboratory has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Waste Treatment Plant (RPP-WTP) project to perform research and development activities. The Pretreatment Engineering Platform (PEP) is being designed and constructed as part of a plan to respond to an issue raised by the WTP External Flowsheet Review Team (EFRT) entitled “Undemonstrated Leaching Processes” and numbered M12. The PEP replicates the WTP leaching process using prototypic equipment and control strategies. The approach for scaling PEP performance data to predict WTP performance is critical to the successful resolution of the EFRT issue. This report describesmore » the recommended PEP scaling approach, PEP data interpretation and provides recommendations on test conduct and data requirements.« less
Bench-Scale Filtration Testing in Support of the Pretreatment Engineering Platform (PEP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Billing, Justin M.; Daniel, Richard C.; Kurath, Dean E.
Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP testing program specifies that bench-scale testing is to bemore » performed in support of specific operations, including filtration, caustic leaching, and oxidative leaching.« less
7 CFR 761.10 - Planning and performing construction and other development.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 7 2011-01-01 2011-01-01 false Planning and performing construction and other... Provisions § 761.10 Planning and performing construction and other development. (a) Purpose. This section describes Agency policies regarding the planning and performing of construction and other development work...
Makarov, A V; Arutyunyan, I V; Bol'shakova, G B; Volkov, A V; Gol'dshtein, D V
2009-10-01
We studied morphological changes in the paraurethral area of Wistar rats after introduction of tissue engineering constructs on the basis of multipotent mesenchymal stem cells and gelatin sponge. The tissue engineering construct containing autologous culture of the stromal fraction of the adipose tissue was most effective. After introduction of this construct we observed more rapid degradation of the construct matrix and more intensive formation of collagen fibers.
Multiyear Program Plan for the High Temperature Materials Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arvid E. Pasto
2000-03-17
Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly,more » the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.« less
Using SysML for verification and validation planning on the Large Synoptic Survey Telescope (LSST)
NASA Astrophysics Data System (ADS)
Selvy, Brian M.; Claver, Charles; Angeli, George
2014-08-01
This paper provides an overview of the tool, language, and methodology used for Verification and Validation Planning on the Large Synoptic Survey Telescope (LSST) Project. LSST has implemented a Model Based Systems Engineering (MBSE) approach as a means of defining all systems engineering planning and definition activities that have historically been captured in paper documents. Specifically, LSST has adopted the Systems Modeling Language (SysML) standard and is utilizing a software tool called Enterprise Architect, developed by Sparx Systems. Much of the historical use of SysML has focused on the early phases of the project life cycle. Our approach is to extend the advantages of MBSE into later stages of the construction project. This paper details the methodology employed to use the tool to document the verification planning phases, including the extension of the language to accommodate the project's needs. The process includes defining the Verification Plan for each requirement, which in turn consists of a Verification Requirement, Success Criteria, Verification Method(s), Verification Level, and Verification Owner. Each Verification Method for each Requirement is defined as a Verification Activity and mapped into Verification Events, which are collections of activities that can be executed concurrently in an efficient and complementary way. Verification Event dependency and sequences are modeled using Activity Diagrams. The methodology employed also ties in to the Project Management Control System (PMCS), which utilizes Primavera P6 software, mapping each Verification Activity as a step in a planned activity. This approach leads to full traceability from initial Requirement to scheduled, costed, and resource loaded PMCS task-based activities, ensuring all requirements will be verified.
Bedinger, M.S.; Reed, J.E.; Wells, C.J.; Swafford, B.F.
1970-01-01
The Arkansas River Multiple-Purpose Plan will provide year-round navigation on the Arkansas River from near its mouth to Muskogee, Okla., and on the Verdigris River from Muskogee to Catoosa, Okla. The altered regimen in the Arkansas and Verdigris Rivers will affect ground-water conditions in the adjacent alluvial aquifers. In 1957 the U.S. Geological Survey and U.S. Army Corps of Engineers entered into a cooperative agreement for a comprehensive ground-water study of the lower Arkansas and Verdigris River valleys. At the request of the Corps of Engineers, the Geological Survey agreed to provide (1) basic ground-water data before, during, and after construction of the Multiple-Purpose Plan and (2) interpretation and projections of postconstruction ground-water conditions. The data collected were used by the Corps of Engineers in preliminary foundation and excavation estimates and by the Geological Survey as the basis for defining the hydrologic properties of, and the ground-water conditions in, the aquifer. The projections of postconstruction ground-water conditions were used by the Corps of Engineers in the planning, design, construction, and operation of the Multiple-Purpose Plan. Analysis and projections of ground-water conditions were made by use of electrical analog models. These models use the analogy between the flow of electricity in a resistance-capacitance circuit and the flow of a liquid in a porous and permeable medium. Verification provides a test of the validity of the analog to perform as the aquifer would, within the range of historic forces. The verification process consists of simulating the action of historic forces which have acted upon the aquifer and of duplicating the aquifer response with the analog. The areal distribution of accretion can be treated as an unknown and can be determined by analog simulation of the piezometric surface in an aquifer. Comparison of accretion with depth to piezometric surface below land surface shows that accretion decreases with decreasing depth to water level. The decrease in accretion is attributed mostly to the increase in evapotranspiration from the aquifer, and where water levels are very near the land surface, to the rejection of recharge. The maximum accretion and the decrease in accretion with the decrease in depth to water are dependent upon the climate and the thickness and lithology of the fine-grained material overlying the aquifer. Dams on the Arkansas and Verdigris Rivers will impose a direct change in water levels in the aquifers adjacent to the rivers. This change will be attenuated by the resultant change in accretion to the aquifer. The analogs of aquifers in the valleys were used to determine the change in ground-water level from preconstruction to postconstruction conditions.
14 CFR 151.111 - Advance planning proposals: General.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Engineering Proposals § 151.111 Advance planning proposals: General. (a) Each advance planning and engineering... application, under §§ 151.21(c) and 151.27, or both. (c) Each proposal must relate to planning and engineering... “Airport Activity Statistics of Certificated Route Air Carriers” (published jointly by FAA and the Civil...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tasseff, Byron
2016-07-29
NUFLOOD Version 1.x is a surface-water hydrodynamic package designed for the simulation of overland flow of fluids. It consists of various routines to address a wide range of applications (e.g., rainfall-runoff, tsunami, storm surge) and real time, interactive visualization tools. NUFLOOD has been designed for general-purpose computers and workstations containing multi-core processors and/or graphics processing units. The software is easy to use and extensible, constructed in mind for instructors, students, and practicing engineers. NUFLOOD is intended to assist the water resource community in planning against water-related natural disasters.
How to HAMMER home hazardous materials training
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ollero, J.
1994-10-01
This article describes HAMMER - the Hazardous Materials Management and Emergency Response Training - program being developed at the Hanford Reservation. The program uses true-to-life props and facilities to simulate emergencies and hazardous conditions. Topics covered include the set-up of the facility and training; the demand for such training; the involvement of the Army Corps of Engineers; the props to be constructed; the educational involvement of Tulane and Xavier Univerisities of Louisiana; temporary facility for the program; partnership with Indian Nations and Stakeholders; and budget plans and constriction. 9 figs.
Mass Uncertainty and Application For Space Systems
NASA Technical Reports Server (NTRS)
Beech, Geoffrey
2013-01-01
Expected development maturity under contract (spec) should correlate with Project/Program Approved MGA Depletion Schedule in Mass Properties Control Plan. If specification NTE, MGA is inclusive of Actual MGA (A5 & A6). If specification is not an NTE Actual MGA (e.g. nominal), then MGA values are reduced by A5 values and A5 is representative of remaining uncertainty. Basic Mass = Engineering Estimate based on design and construction principles with NO embedded margin MGA Mass = Basic Mass * assessed % from approved MGA schedule. Predicted Mass = Basic + MGA. Aggregate MGA % = (Aggregate Predicted - Aggregate Basic) /Aggregate Basic.
Intelligent hypertext systems for aerospace engineering applications
NASA Technical Reports Server (NTRS)
Lo, Ching F.
1989-01-01
This paper is a progress report on the utilization of AI technology for assisting users locating and understanding technical information in manuals used for planning and conducting wind tunnel test. The specific goal is to create an Intelligent Hypertext System (IHS) for wind tunnel testing which combines the computerized manual in the form of hypertext and an advisory system that stores experts' knowledge and experiences. A prototype IHS for conducting transonic wind tunnel testing has been constructed with limited knowledge base. The prototype is being evaluated by potential users.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2011-01-01
This document will teach students about careers in the wind energy industry. Wind energy, both land-based and offshore, is expected to provide thousands of new jobs in the next several decades. Wind energy companies are growing rapidly to meet America's demand for clean, renewable, and domestic energy. These companies need skilled professionals. Wind power careers will require educated people from a variety of areas. Trained and qualified workers manufacture, construct, operate, and manage wind energy facilities. The nation will also need skilled researchers, scientists, and engineers to plan and develop the next generation of wind energy technologies.
Initial closed operation of the CELSS Test Facility Engineering Development Unit
NASA Technical Reports Server (NTRS)
Kliss, M.; Blackwell, C.; Zografos, A.; Drews, M.; MacElroy, R.; McKenna, R.; Heyenga, A. G.
2003-01-01
As part of the NASA Advanced Life Support Flight Program, a Controlled Ecological Life Support System (CELSS) Test Facility Engineering Development Unit has been constructed and is undergoing initial operational testing at NASA Ames Research Center. The Engineering Development Unit (EDU) is a tightly closed, stringently controlled, ground-based testbed which provides a broad range of environmental conditions under which a variety of CELSS higher plant crops can be grown. Although the EDU was developed primarily to provide near-term engineering data and a realistic determination of the subsystem and system requirements necessary for the fabrication of a comparable flight unit, the EDU has also provided a means to evaluate plant crop productivity and physiology under controlled conditions. This paper describes the initial closed operational testing of the EDU, with emphasis on the hardware performance capabilities. Measured performance data during a 28-day closed operation period are compared with the specified functional requirements, and an example of inferring crop growth parameters from the test data is presented. Plans for future science and technology testing are also discussed. Published by Elsevier Science Ltd on behalf of COSPAR.
The research on construction and application of machining process knowledge base
NASA Astrophysics Data System (ADS)
Zhao, Tan; Qiao, Lihong; Qie, Yifan; Guo, Kai
2018-03-01
In order to realize the application of knowledge in machining process design, from the perspective of knowledge in the application of computer aided process planning(CAPP), a hierarchical structure of knowledge classification is established according to the characteristics of mechanical engineering field. The expression of machining process knowledge is structured by means of production rules and the object-oriented methods. Three kinds of knowledge base models are constructed according to the representation of machining process knowledge. In this paper, the definition and classification of machining process knowledge, knowledge model, and the application flow of the process design based on the knowledge base are given, and the main steps of the design decision of the machine tool are carried out as an application by using the knowledge base.
ERIC Educational Resources Information Center
Ontario Council on Graduate Studies, Toronto. Advisory Committee on Academic Planning.
On the instruction of the Council of Ontario Universities, the Advisory Committee on Academic Planning in cooperation with the Committee of Ontario Deans of Engineering has conducted a planning assessment for doctoral work in mechanical engineering. This report presents as overview of the recommendations for each of the assessments conducted in…
NASA Astrophysics Data System (ADS)
Aktan, A. Emin
2003-08-01
Although the interconnected systems nature of the infrastructures, and the complexity of interactions between their engineered, socio-technical and natural constituents have been recognized for some time, the principles of effectively operating, protecting and preserving such systems by taking full advantage of "modeling, simulations, optimization, control and decision making" tools developed by the systems engineering and operations research community have not been adequately studied or discussed by many engineers including the writer. Differential and linear equation systems, numerical and finite element modeling techniques, statistical and probabilistic representations are universal, however, different disciplines have developed their distinct approaches to conceptualizing, idealizing and modeling the systems they commonly deal with. The challenge is in adapting and integrating deterministic and stochastic, geometric and numerical, physics-based and "soft (data-or-knowledge based)", macroscopic or microscopic models developed by various disciplines for simulating infrastructure systems. There is a lot to be learned by studying how different disciplines have studied, improved and optimized the systems relating to various processes and products in their domains. Operations research has become a fifty-year old discipline addressing complex systems problems. Its mathematical tools range from linear programming to decision processes and game theory. These tools are used extensively in management and finance, as well as by industrial engineers for optimizing and quality control. Progressive civil engineering academic programs have adopted "systems engineering" as a focal area. However, most of the civil engineering systems programs remain focused on constructing and analyzing highly idealized, often generic models relating to the planning or operation of transportation, water or waste systems, maintenance management, waste management or general infrastructure hazards risk management. We further note that in the last decade there have been efforts for "agent-based" modeling of synthetic infrastructure systems by taking advantage of supercomputers at various DOE Laboratories. However, whether there is any similitude between such synthetic and actual systems needs investigating further.
NASA Astrophysics Data System (ADS)
Weatherwax Scott, Caroline; Tsareff, Christopher R.
1990-06-01
One of the main goals of process engineering in the semiconductor industry is to improve wafer fabrication productivity and throughput. Engineers must work continuously toward this goal in addition to performing sustaining and development tasks. To accomplish these objectives, managers must make efficient use of engineering resources. One of the tools being used to improve efficiency is the diagnostic expert system. Expert systems are knowledge based computer programs designed to lead the user through the analysis and solution of a problem. Several photolithography diagnostic expert systems have been implemented at the Hughes Technology Center to provide a systematic approach to process problem solving. This systematic approach was achieved by documenting cause and effect analyses for a wide variety of processing problems. This knowledge was organized in the form of IF-THEN rules, a common structure for knowledge representation in expert system technology. These rules form the knowledge base of the expert system which is stored in the computer. The systems also include the problem solving methodology used by the expert when addressing a problem in his area of expertise. Operators now use the expert systems to solve many process problems without engineering assistance. The systems also facilitate the collection of appropriate data to assist engineering in solving unanticipated problems. Currently, several expert systems have been implemented to cover all aspects of the photolithography process. The systems, which have been in use for over a year, include wafer surface preparation (HMDS), photoresist coat and softbake, align and expose on a wafer stepper, and develop inspection. These systems are part of a plan to implement an expert system diagnostic environment throughout the wafer fabrication facility. In this paper, the systems' construction is described, including knowledge acquisition, rule construction, knowledge refinement, testing, and evaluation. The roles played by the process engineering expert and the knowledge engineer are discussed. The features of the systems are shown, particularly the interactive quality of the consultations and the ease of system use.
Chou, Chih-Ling; Rivera, Alexander L; Williams, Valencia; Welter, Jean F; Mansour, Joseph M; Drazba, Judith A; Sakai, Takao; Baskaran, Harihara
2017-09-15
Current clinical methods to treat articular cartilage lesions provide temporary relief of the symptoms but fail to permanently restore the damaged tissue. Tissue engineering, using mesenchymal stem cells (MSCs) combined with scaffolds and bioactive factors, is viewed as a promising method for repairing cartilage injuries. However, current tissue engineered constructs display inferior mechanical properties compared to native articular cartilage, which could be attributed to the lack of structural organization of the extracellular matrix (ECM) of these engineered constructs in comparison to the highly oriented structure of articular cartilage ECM. We previously showed that we can guide MSCs undergoing chondrogenesis to align using microscale guidance channels on the surface of a two-dimensional (2-D) collagen scaffold, which resulted in the deposition of aligned ECM within the channels and enhanced mechanical properties of the constructs. In this study, we developed a technique to roll 2-D collagen scaffolds containing MSCs within guidance channels in order to produce a large-scale, three-dimensional (3-D) tissue engineered cartilage constructs with enhanced mechanical properties compared to current constructs. After rolling the MSC-scaffold constructs into a 3-D cylindrical structure, the constructs were cultured for 21days under chondrogenic culture conditions. The microstructure architecture and mechanical properties of the constructs were evaluated using imaging and compressive testing. Histology and immunohistochemistry of the constructs showed extensive glycosaminoglycan (GAG) and collagen type II deposition. Second harmonic generation imaging and Picrosirius red staining indicated alignment of neo-collagen fibers within the guidance channels of the constructs. Mechanical testing indicated that constructs containing the guidance channels displayed enhanced compressive properties compared to control constructs without these channels. In conclusion, using a novel roll-up method, we have developed large scale MSC based tissue-engineered cartilage that shows microscale structural organization and enhanced compressive properties compared to current tissue engineered constructs. Tissue engineered cartilage constructs made with human mesenchymal stem cells (hMSCs), scaffolds and bioactive factors are a promising solution to treat cartilage defects. A major disadvantage of these constructs is their inferior mechanical properties compared to the native tissue, which is likely due to the lack of structural organization of the extracellular matrix of the engineered constructs. In this study, we developed three-dimensional (3-D) cartilage constructs from rectangular scaffold sheets containing hMSCs in micro-guidance channels and characterized their mechanical properties and metabolic requirements. The work led to a novel roll-up method to embed 2-D microscale structures in 3-D constructs. Further, micro-guidance channels incorporated within the 3-D cartilage constructs led to the production of aligned cell-produced matrix and enhanced mechanical function. Copyright © 2017 Acta Materialia Inc. Published by Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-23
... Engineering, Architectural Services, Design Policies and Construction Standards AGENCY: Rural Utilities..., engineering services and architectural services for transactions above the established threshold dollar levels... Code of Federal Regulations as follows: PART 1724--ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND...
A puzzle assembly strategy for fabrication of large engineered cartilage tissue constructs.
Nover, Adam B; Jones, Brian K; Yu, William T; Donovan, Daniel S; Podolnick, Jeremy D; Cook, James L; Ateshian, Gerard A; Hung, Clark T
2016-03-21
Engineering of large articular cartilage tissue constructs remains a challenge as tissue growth is limited by nutrient diffusion. Here, a novel strategy is investigated, generating large constructs through the assembly of individually cultured, interlocking, smaller puzzle-shaped subunits. These constructs can be engineered consistently with more desirable mechanical and biochemical properties than larger constructs (~4-fold greater Young׳s modulus). A failure testing technique was developed to evaluate the physiologic functionality of constructs, which were cultured as individual subunits for 28 days, then assembled and cultured for an additional 21-35 days. Assembled puzzle constructs withstood large deformations (40-50% compressive strain) prior to failure. Their ability to withstand physiologic loads may be enhanced by increases in subunit strength and assembled culture time. A nude mouse model was utilized to show biocompatibility and fusion of assembled puzzle pieces in vivo. Overall, the technique offers a novel, effective approach to scaling up engineered tissues and may be combined with other techniques and/or applied to the engineering of other tissues. Future studies will aim to optimize this system in an effort to engineer and integrate robust subunits to fill large defects. Copyright © 2016 Elsevier Ltd. All rights reserved.
A Puzzle Assembly Strategy for Fabrication of Large Engineered Cartilage Tissue Constructs
Nover, Adam B.; Jones, Brian K.; Yu, William T.; Donovan, Daniel S.; Podolnick, Jeremy D.; Cook, James L.; Ateshian, Gerard A.; Hung, Clark T.
2016-01-01
Engineering of large articular cartilage tissue constructs remains a challenge as tissue growth is limited by nutrient diffusion. Here, a novel strategy is investigated, generating large constructs through the assembly of individually cultured, interlocking, smaller puzzle-shaped subunits. These constructs can be engineered consistently with more desirable mechanical and biochemical properties than larger constructs (~4-fold greater Young's modulus). A failure testing technique was developed to evaluate the physiologic functionality of constructs, which were cultured as individual subunits for 28 days, then assembled and cultured for an additional 21-35 days. Assembled puzzle constructs withstood large deformations (40-50% compressive strain) prior to failure. Their ability to withstand physiologic loads may be enhanced by increases in subunit strength and assembled culture time. A nude mouse model was utilized to show biocompatibility and fusion of assembled puzzle pieces in vivo. Overall, the technique offers a novel, effective approach to scaling up engineered tissues and may be combined with other techniques and/or applied to the engineering of other tissues. Future studies will aim to optimize this system in an effort to engineer and integrate robust subunits to fill large defects. PMID:26895780
The 300 H.P. Benz Aircraft Engine
NASA Technical Reports Server (NTRS)
Heller, A
1921-01-01
A description is given of the Benz 12-cylinder aircraft engine. The 300 H.P. engine, with the cylinders placed at an angle of 60 degrees not only realizes a long-cherished conception, but has received refinement in detail. It may be described as a perfect example of modern German aircraft engine construction. Here, a detailed description is given of the construction of this engine. Emphasis is placed on the design and construction of the cylinders, pistons, and connecting rods. Also discussed are engine fitting, lubrication, oil pumps, bearings, the oil tank, fuel pump, carburetors, and cooling system.
Engineering Technical Review Planning Briefing
NASA Technical Reports Server (NTRS)
Gardner, Terrie
2012-01-01
The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.
Construction and engineering of large biochemical pathways via DNA assembler
Shao, Zengyi; Zhao, Huimin
2015-01-01
Summary DNA assembler enables rapid construction and engineering of biochemical pathways in a one-step fashion by exploitation of the in vivo homologous recombination mechanism in Saccharomyces cerevisiae. It has many applications in pathway engineering, metabolic engineering, combinatorial biology, and synthetic biology. Here we use two examples including the zeaxanthin biosynthetic pathway and the aureothin biosynthetic gene cluster to describe the key steps in the construction of pathways containing multiple genes using the DNA assembler approach. Methods for construct design, pathway assembly, pathway confirmation, and functional analysis are shown. The protocol for fine genetic modifications such as site-directed mutagenesis for engineering the aureothin gene cluster is also illustrated. PMID:23996442
An Evaluation of the Pavement Condition Index Prediction Model for Rigid Airfield Pavements
1982-09-01
UNCLASSIFIED SECURITY CLASSIFICATION OF THIS PAGO(I*%A Data Entotoi) The United States Army Corps of Engineers, Construction Engineering Research Laboratory...Condition . . . 31 Pavement Design/ Construction ....... . 82 Aircraft Traffic ........ .............. 82 Climate Conditions ........ ............. 84...PATTERSON AFB . . . . . . . . . . . . . . . . . . . . . . . . . 155 C. DATA OBTAINED FROM THE CONSTRUCTION ENGINEERING RESEARCH LABORATORY. .. .. 168 D
Code of Federal Regulations, 2010 CFR
2010-10-01
... work or architect-engineer services. (NASA supplements paragraph (a)) 1827.304-3 Section 1827.304-3... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 1827.304-3 Contracts for construction work or architect-engineer services. (NASA supplements paragraph (a)) (a) For construction or...
48 CFR 936.7101 - Construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...
48 CFR 936.7101 - Construction contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...
48 CFR 936.7101 - Construction contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...
48 CFR 936.7101 - Construction contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...
48 CFR 936.7101 - Construction contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...
NASA Astrophysics Data System (ADS)
Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping
2018-03-01
System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.
48 CFR 31.105 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...
48 CFR 836.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2012 CFR
2012-10-01
... with architect-engineer firms. 836.209 Section 836.209 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER...-engineer firms. (a) When the contracting officer considers it necessary or advantageous to award a contract...
48 CFR 31.105 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...
48 CFR 836.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with architect-engineer firms. 836.209 Section 836.209 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER...-engineer firms. (a) When the contracting officer considers it necessary or advantageous to award a contract...
48 CFR 836.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with architect-engineer firms. 836.209 Section 836.209 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER...-engineer firms. (a) When the contracting officer considers it necessary or advantageous to award a contract...
48 CFR 31.105 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...
48 CFR 36.702 - Forms for use in contracting for architect-engineer services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contracting for architect-engineer services. 36.702 Section 36.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Standard and Optional Forms for Contracting for Construction, Architect-Engineer Services, and...
48 CFR 36.702 - Forms for use in contracting for architect-engineer services.
Code of Federal Regulations, 2011 CFR
2011-10-01
... contracting for architect-engineer services. 36.702 Section 36.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Standard and Optional Forms for Contracting for Construction, Architect-Engineer Services, and...
48 CFR 31.105 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...
48 CFR 836.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... with architect-engineer firms. 836.209 Section 836.209 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER...-engineer firms. (a) When the contracting officer considers it necessary or advantageous to award a contract...
48 CFR 836.209 - Construction contracts with architect-engineer firms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... with architect-engineer firms. 836.209 Section 836.209 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER...-engineer firms. (a) When the contracting officer considers it necessary or advantageous to award a contract...
48 CFR 36.702 - Forms for use in contracting for architect-engineer services.
Code of Federal Regulations, 2014 CFR
2014-10-01
... contracting for architect-engineer services. 36.702 Section 36.702 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Standard and Optional Forms for Contracting for Construction, Architect-Engineer Services, and...
Han, Hyemin; Jeong, Changwoo
2014-03-01
This study develops a Science-Technology-Society (STS)-based science ethics education program for high school students majoring in or planning to major in science and engineering. Our education program includes the fields of philosophy, history, sociology and ethics of science and technology, and other STS-related theories. We expected our STS-based science ethics education program to promote students' epistemological beliefs and moral judgment development. These psychological constructs are needed to properly solve complicated moral and social dilemmas in the fields of science and engineering. We applied this program to a group of Korean high school science students gifted in science and engineering. To measure the effects of this program, we used an essay-based qualitative measurement. The results indicate that there was significant development in both epistemological beliefs and moral judgment. In closing, we briefly discuss the need to develop epistemological beliefs and moral judgment using an STS-based science ethics education program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eggeman, Tim; O'Neill, Brian
2016-08-17
ZeaChem Inc. and US DOE successfully demonstrated the ZeaChem process for producing sugars and ethanol from high-impact biomass feedstocks. The project was executed over a 5-year period under a $31.25 million cooperative agreement (80:20 Federal:ZeaChem cost share). The project was managed by dividing it into three budget periods. Activities during Budget Period 1 were limited to planning, permitting, and other pre-construction planning. Budget Period 2 activities included engineering, procurement, construction, commissioning, start-up and initial operations through the Independent Engineer Test Runs. The scope of construction was limited to the Chem Frac and Hydrogenolysis units, as the Core Facility was alreadymore » in place. Construction was complete in December 2012, and the first cellulosic ethanol was produced in February 2013. Additional operational test runs were conducted during Budget Period 3 (completed June 2015) using hybrid poplar, corn stover, and wheat straw feedstocks, resulting in the production of cellulosic ethanol and various other biorefinery intermediates. The research adds to the understanding of the Chem Frac and Hydrogenolysis technologies in that the technical performance of each unit was measured, and the resulting data and operational experience can be used as the basis for engineering designs, thus mitigating risks for deployment in future commercial facilities. The Chem Frac unit was initially designed to be operated as two-stage dilute acid hydrolysis, with first stage conditions selected to remove the hemicellulose fraction of the feedstock, and the second stage conditions selected to remove the cellulose fraction. While the Chem Frac unit met or exceeded the design capacity of 10 ton(dry)/day, the technical effectiveness of the Chem Frac unit was below expectations in its initial two-stage dilute acid configuration. The sugars yields were low, the sugars were dilute, and the sugars had poor fermentability caused by excessive inhibitors from wood breakdown products, resulting in a non-viable process from an economic point of view. Later runs with the Chem Frac unit switched to a configuration that used dilute acid pretreatment followed by enzymatic hydrolysis. This change improved yield, increased sugar concentrations, and improved fermentability of sugars. The Hydrogenolysis unit met or exceeded all expectations with respect to unit capacity, technical performance, and economic performance. The US DOE funds for the project were provided through the American Recovery and Reinvestment Act of 2009. In addition to the scientific/technical merit of the project, this project benefited the public through the creation of approximately 75 onsite direct construction-related jobs, 25 direct on-going operations-related jobs, plus numerous indirect jobs, and thus was well aligned with the goals of the American Recovery and Reinvestment Act of 2009.« less
Port Granby Project Overview - 13208
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, David W.; Vandergaast, Gary; Sungaila, Mark
2013-07-01
The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Projectmore » was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)« less
Permafrost Hazards and Linear Infrastructure
NASA Astrophysics Data System (ADS)
Stanilovskaya, Julia; Sergeev, Dmitry
2014-05-01
The international experience of linear infrastructure planning, construction and exploitation in permafrost zone is being directly tied to the permafrost hazard assessment. That procedure should also consider the factors of climate impact and infrastructure protection. The current global climate change hotspots are currently polar and mountain areas. Temperature rise, precipitation and land ice conditions change, early springs occur more often. The big linear infrastructure objects cross the territories with different permafrost conditions which are sensitive to the changes in air temperature, hydrology, and snow accumulation which are connected to climatic dynamics. One of the most extensive linear structures built on permafrost worldwide are Trans Alaskan Pipeline (USA), Alaska Highway (Canada), Qinghai-Xizang Railway (China) and Eastern Siberia - Pacific Ocean Oil Pipeline (Russia). Those are currently being influenced by the regional climate change and permafrost impact which may act differently from place to place. Thermokarst is deemed to be the most dangerous process for linear engineering structures. Its formation and development depend on the linear structure type: road or pipeline, elevated or buried one. Zonal climate and geocryological conditions are also of the determining importance here. All the projects are of the different age and some of them were implemented under different climatic conditions. The effects of permafrost thawing have been recorded every year since then. The exploration and transportation companies from different countries maintain the linear infrastructure from permafrost degradation in different ways. The highways in Alaska are in a good condition due to governmental expenses on annual reconstructions. The Chara-China Railroad in Russia is under non-standard condition due to intensive permafrost response. Standards for engineering and construction should be reviewed and updated to account for permafrost hazards caused by the climate change. Extra maintenance activity is needed for existence infrastructure to stay operable. Engineers should run climate models under the most pessimistic scenarios when planning new infrastructure projects. That would allow reducing the potential shortcomings related to the permafrost thawing.
Engineering geology considerations for park planning, Antelope Island State Park, Davis County, Utah
Hecker, Suzanne; Case, William F.; King, Jon K.; Willis, Grant C.
2000-01-01
Report: 00-1 In the mid-1980s, historically high levels of Great Salt Lake caused damage to park facilities on Antelope Island and destroyed the causeway linking the park to the mainland. Information on the engineering geology of Antelope Islandcan be used to improve park facilities and reduce the risk from geologic hazards and poor construction conditions. Certain characteristics of the geologic environment need to be considered in park planning. During wet cycles, Great Salt Lake may reach static levels of 4,217 feet (1,285.3 m), and wave- and wind-elevated levels locally may reach 6.5 feet (2 m) higher. A probabilistic assessment of the earthquake ground-shaking hazard along the Wasatch Front indicates that peak ground accelerations of approximately 0.20 to 0.30 g have a one-in-ten chance of being exceeded in 50 years on the island. A slope-failure hazard exists locally in colluvial and Lake Bonneville deposits, along the modern shore, and beneath cliffs. Flash-flood and debris-flow hazards exist on alluvial fans. Areas in the southern two-thirds of the island may have a relatively high potential for radon emission. Particular soil types on the island may be expansive, compressible, erodible, impermeable, or susceptible to liquefaction or hydrocompaction. The distribution of most geologic hazards can be defined, and many locations on the island have conditions suitable for construction. Lacustrine sand and gravel deposits are wide-spread and have engineering characteristics that are generally favorable for foundations. However, facilities and roads built close to the modern shoreline may be susceptible to lake flooding and erosion, slope failures, shallow ground water, and burial by active sand dunes. Well-graded (poorly sorted) alluvial-fan deposits are generally most suitable for wastewater disposal, although they may be subject to flooding or be underlain by low-permeability, fine-grained lacustrine deposits.
A BIM-based system for demolition and renovation waste estimation and planning.
Cheng, Jack C P; Ma, Lauren Y H
2013-06-01
Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C&D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D&R) works and the growing amount of D&R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control. Copyright © 2013 Elsevier Ltd. All rights reserved.
NASA Technical Reports Server (NTRS)
Miller, K.; Davis, E. E.
1977-01-01
Construction and transportation systems and operations are described for the following combinations: (1) silicon photovoltaic CR=1 satellite constructed primarily in low earth orbit (LEO); (2) silicon photovoltaic CR=1 satellite constructed in geosynchronous earth orbit (GEO); (3) Rankine thermal engine satellite constructed primarily in LEO; and (4) Rankine thermal engine satellite constructed in GEO.
Making Work: Demonstrating Thermodynamic Concepts with Solar-Powered Wax and Rubber Heat Engines
ERIC Educational Resources Information Center
Appleyard, S. J.
2007-01-01
Construction details are provided for simple heat engines that use candle wax and elastomers as working substances. The engines are constructed using common household materials and can be easily constructed in a school classroom or at home. They work reliably and are useful tools for demonstrating the conversion of heat to mechanical work. They…
Code of Federal Regulations, 2014 CFR
2014-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2010 CFR
2010-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2011 CFR
2011-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2012 CFR
2012-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2013 CFR
2013-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Construction Strategy and Progress of Whole Intervertebral Disc Tissue Engineering.
Yang, Qiang; Xu, Hai-wei; Hurday, Sookesh; Xu, Bao-shan
2016-02-01
Degenerative disc disease (DDD) is the major cause of low back pain, which usually leads to work absenteeism, medical visits and hospitalization. Because the current conservative procedures and surgical approaches to treatment of DDD only aim to relieve the symptoms of disease but not to regenerate the diseased disc, their long-term efficiency is limited. With the rapid developments in medical science, tissue engineering techniques have progressed markedly in recent years, providing a novel regenerative strategy for managing intervertebral disc disease. However, there are as yet no ideal methods for constructing tissue-engineered intervertebral discs. This paper reviews published reports pertaining to intervertebral disc tissue engineering and summarizes data concerning the seed cells and scaffold materials for tissue-engineered intervertebral discs, construction of tissue-engineered whole intervertebral discs, relevant animal experiments and effects of mechanics on the construction of tissue-engineered intervertebral disc and outlines the existing problems and future directions. Although the perfect regenerative strategy for treating DDD has not yet been developed, great progress has been achieved in the construction of tissue-engineered intervertebral discs. It is believed that ongoing research on intervertebral disc tissue engineering will result in revolutionary progress in the treatment of DDD. © 2016 Chinese Orthopaedic Association and John Wiley & Sons Australia, Ltd.