Science.gov

Sample records for planning environmental externalities

  1. Planning for Change: Assessing Internal and External Environmental Factors.

    ERIC Educational Resources Information Center

    Coffey, Janis Cox

    This report provides, first, an overview of the external and internal environmental factors affecting planning in California's community colleges; and, second, an examination of the influence of the demographics of the Los Rios Community College District (LRCCD). After an executive summary, introductory material discusses ways in which change can…

  2. Using External Environmental Scanning and Forecasting to Improve Strategic Planning

    ERIC Educational Resources Information Center

    Lapin, Joel D.

    2004-01-01

    The effectiveness of community colleges is increasingly dependent on their understanding of the external environment and their capacity to forecast and respond to the changing external landscape. As a result, they need to establish a system to continuously monitor changes in that environment and to identify and weigh the implications of changes on…

  3. Issues and methods in incorporating environmental externalities into the integrated resource planning process

    SciTech Connect

    Fang, J.M.; Galen, P.S.

    1994-11-01

    This report is a review of current practices and policies in considering environmental externalities in the integrated resource planning and performance based regulation (IRP/PBR) process. The following issues are presented and examined: What are the pros and cons of treating environmental externalities in the IRP process? How are potential future environmental regulations being treated? Are externalities being qualitatively or quantitatively considered, or monetized? Are offsets being allowed? How are externality policies being coordinated among different levels and branches of governments? Should environmental externalities be considered in dispatching a utility`s existing resources? What are the procedures for addressing uncertainty in incorporating environmental externalities into IRP? How are externalities valued? What are other approaches to addressing environmental externalities. This report describes seven major approaches for addressing environmental externalities in the IRP process: qualitative treatment, weighting and ranking, cost of control, damage function, percentage adders, monetization by emission, and multiattribute trade-off analysis. The discussion includes a taxonomy of the full range of alternative methods for addressing environmental externalities, a summary of state PUC actions, the role of state laws, the debate on environmental adders, and the choice of methodologies. In addition, this report characterizes the interests of stakeholders such as the electric industry, fuel suppliers, energy consumers, governmental agencies, public interest groups, consultants, and others. It appears that the views, positions, and interests of these stakeholders are affected by their perceptions of the potential impacts on their economic interests or the viability of their position on environmental policy, by the societal perspective they take, and by the orientation of the analysts toward market competition and their respective accumulated expertise.

  4. The role of integrated resource planning, environmental externalities, and anticipation of future regulation in compliance planning under the Clean Air Act Amendments of 1990

    SciTech Connect

    Bernow, S.; Biewald, B.; Wulfsberg, K.

    1993-07-01

    Utilities are developing sulfur dioxide (SO{sub 2}) emission compliance plans to meet limitations of the Clean Air Act Amendments of 1990 (CAAA). Compliance plans will have long-term effects on resource selection, fuel choice, and system dispatch. Use of integrated resource planning (IRP) is necessary to ensure compliance plans are consistent with the overall societal goals. In particular, environmental externalities must be integrated with the compliance planning process. The focus of the CAAA is on air pollution reduction, specifically acid gases and toxics, and attainment of National Ambient Air Quality Standards (NAAQS) for criteria pollutants. Title IV specifically focuses on sulfur dioxide with a national allowance trading system, while further regulation of toxics and nitrogen oxides is slated for additional study. Yet, compliance planning based narrowly upon today`s environmental regulations could fail to meet the broad goals of IRP if a larger array of environmental externalities is excluded from the analysis. Compliance planning must consider a broad range of environmental effects from energy production and use to (1) protect society`s long-term stake in environmental quality, and (2) ensure that today`s plans are rich enough to accommodate potential changes in regulation and national environmental goals. The explicit recognition of environmental effects, such as those associated with CO{sub 2} release, will result in prudent compliance plans that take advantage of current opportunities for pollution avoidance and have long-term viability in the face of regulatory change. By including such considerations, the mix of resources acquired and operated (supply and demand, existing and new, conventional and renewable, fuel type and fuel quality, pollution control, and dispatch protocols) will be robust and truly least-cost.

  5. External Environmental Forecast.

    ERIC Educational Resources Information Center

    Lapin, Joel D.

    Representing current viewpoints of academics, futures experts, and social observers, this external environmental forecast presents projections and information of particular relevance to the future of Catonsville Community College. The following topics are examined: (1) population changes and implications for higher education; (2) state and local…

  6. External Strategic Planning Conference.

    ERIC Educational Resources Information Center

    Los Angeles Community Coll. District, CA. Office of Research and Planning.

    In response to a community reputation that has grown increasingly negative, the Los Angeles Community College District (LACCD) devised a strategic plan in 1998 to improve its programs and services and assure the educational success of its students. The planning process involved several steps: (1) revisiting the district mission statement; (2)…

  7. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  8. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  9. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  10. Environmental monitoring plan

    SciTech Connect

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  11. Environmental implementation plan

    SciTech Connect

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  12. Environmental Monitoring Plan

    SciTech Connect

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  13. Proceedings: National conference on environmental externalities

    SciTech Connect

    Not Available

    1990-12-31

    This report is the proceedings of the National Conference on Environmental Externalities. A environmental externality is the environmental impact of a process or a plant that society must endure. It is a social cost and is paid, but not by the company who produced it or the company`s customers who endure it. The main purpose of this report is to gather the many designs and ideas of how and why to internalize the externalities into the pricing systems of the public utility commissions, especially that of the electric utilities. Economic and sociological aspects of the internalization of these externalities are given in these proceedings. Individual papers are processed separately for databases. (MB)

  14. Nevada Environmental Studies Plan

    SciTech Connect

    1991-07-01

    The Nevada Environmental Studies Plan (NESP) presents the ESA team`s overall program of investigations of environmental conditions and activities related to potential impacts of studies by the US Department of Energy (DOE) in its program for developing Yucca Mt., Nevada, as the national high level nuclear waste (HLW) repository. The environmental studies specifically entail investigations of terrestrial ecology, soils and geomorphology, hydrology and water quality, archaeology and cultural resources, meteorology and air quality, noise, visual resources and reclamation planning. The NESP is a program of nine primary projects, described in this Plan. The nine projects of the program are distributed over three years. NESP`88-`89 is the first phase, covering the fiscal year (FY) July 1, 1988--June 30, 1989. The first phase is focused on program planning; preparation of various documents related to identifying impacts of past DOE activities and associated reclamation costs; review of DOE documents on environmental issues; and initiation of field investigations to establish the environmental issues; and initiation of field investigations to establish the environmental baseline conditions of the site. NESP`89-`90 is the second phase of the program, covering activities during FY`89-`90. The primary activities include continuing environmental baseline investigations; oversight of DOE activities including regulatory compliance assessments, field monitoring of DOE activities; development of disturbance, impact and reclamation models; and reclamation planning. NESP`90-`91 is the third phase of the program. The primary foci include continuing environmental monitoring of DOE activities and reclamation planning. Each of the phases is described in this Executive Summary. NESP`88-`89 is described in detail in the second part of the Study Plan. 86 refs., 20 tabs.

  15. Environmental Education Strategic Plan

    SciTech Connect

    1991-12-01

    This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

  16. Environmental Monitoring Plan

    SciTech Connect

    Althouse, P E; Bertoldo, N A; Bowen, B M; Brown, R A; Campbell, C G; Christofferson, E; Gallegos, G M; Grayson, A R; Jones, H E; Larson, J M; Laycak, D; Mathews, S; Peterson, S R; Revelli, M J; Rueppel, D; Williams, R A; Wilson, K; Woods, N

    2005-11-23

    The purpose of the environmental monitoring plan (EMP) is to promote the early identification of, and response to, potential adverse environmental impacts associated with DOE operations. Environmental monitoring supports the Integrated Safety Management System (ISMS) to detect, characterize, and respond to releases from DOE activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of the DOE activity. In addition, the EMP addresses the analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of radionuclide samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. Until recently, environmental monitoring at Lawrence Livermore National Laboratory (LLNL) was required by DOE Order 5400.1, which was canceled in January 2003. LLNL is in the process of adopting the ISO 14001 Environmental Management Systems standard, which contains requirements to perform and document environmental monitoring. The ISO 14001 standard is not as prescriptive as DOE Order 5400.1, which expressly required an EMP. LLNL will continue to prepare the EMP because it provides an organizational framework for ensuring that the work is conducted appropriately. The environmental monitoring addressed by the plan includes preoperational characterization and assessment, and effluent and surveillance monitoring. Additional environmental monitoring is conducted at LLNL as part of the compliance with the

  17. Optimization approaches for planning external beam radiotherapy

    NASA Astrophysics Data System (ADS)

    Gozbasi, Halil Ozan

    Cancer begins when cells grow out of control as a result of damage to their DNA. These abnormal cells can invade healthy tissue and form tumors in various parts of the body. Chemotherapy, immunotherapy, surgery and radiotherapy are the most common treatment methods for cancer. According to American Cancer Society about half of the cancer patients receive a form of radiation therapy at some stage. External beam radiotherapy is delivered from outside the body and aimed at cancer cells to damage their DNA making them unable to divide and reproduce. The beams travel through the body and may damage nearby healthy tissue unless carefully planned. Therefore, the goal of treatment plan optimization is to find the best system parameters to deliver sufficient dose to target structures while avoiding damage to healthy tissue. This thesis investigates optimization approaches for two external beam radiation therapy techniques: Intensity-Modulated Radiation Therapy (IMRT) and Volumetric-Modulated Arc Therapy (VMAT). We develop automated treatment planning technology for IMRT that produces several high-quality treatment plans satisfying provided clinical requirements in a single invocation and without human guidance. A novel bi-criteria scoring based beam selection algorithm is part of the planning system and produces better plans compared to those produced using a well-known scoring-based algorithm. Our algorithm is very efficient and finds the beam configuration at least ten times faster than an exact integer programming approach. Solution times range from 2 minutes to 15 minutes which is clinically acceptable. With certain cancers, especially lung cancer, a patient's anatomy changes during treatment. These anatomical changes need to be considered in treatment planning. Fortunately, recent advances in imaging technology can provide multiple images of the treatment region taken at different points of the breathing cycle, and deformable image registration algorithms can

  18. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  19. Environmental Monitoring Plan

    SciTech Connect

    Althouse, P E; Biermann, A; Brigdon, S L; Brown, R A; Campbell, C G; Christofferson, E; Clark, L M; Folks, K J; Gallegos, G M; Gouveia, F J; Grayson, A; Harrach, R J; Hoppes, W G; Jones, H; Mathews, S; Merrigan, J R; Peterson, S R; Revelli, M; Rueppel, D; Sanchez, L; Tate, P J; Vellinger, R J; Ward, B; Williams, R

    2006-01-10

    Environmental monitoring personnel from Lawrence Livermore National Laboratory (LLNL) prepared this ''Environmental Monitoring Plan'' (EMP) to meet the requirements in the U.S. Department of Energy (DOE) ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' (DOE 1991) and applicable portions of DOE Orders 5400.1 and 5400.5 (see WSS B93 and B94 in Appendix B). ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' is followed as a best management practice; under Work Smart Standards, LLNL complies with portions of DOE Orders 5400.1 and 5400.5 as shown in Appendix B. This document is a revision of the May 1999 EMP (Tate et al. 1999) and is current as of March 1, 2002. LLNL is one of the nation's premier applied-science national security laboratories. Its primary mission is to ensure that the nation's nuclear weapons remain safe, secure, and reliable, and to prevent the spread and use of nuclear weapons worldwide. LLNL's programs in advanced technologies, energy, environment, biosciences, and basic science apply LLNL's unique capabilities and enhance the competencies needed for this national security mission. LLNL's mission also involves working with industrial and academic partners to increase national competitiveness and improve science education. LLNL's mission is dynamic and has changed over the years to meet new national needs. In keeping with the Laboratory's mission, the environment, safety, and health (ES&H) have top priority. LLNL's policy is to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage. The environment, safety, and health are to be priority considerations in the planning and execution of all work activities at the Laboratory (LLNL 2001). Furthermore, it is the policy of LLNL to comply with applicable ES&H laws, regulations, and requirements

  20. External Review of GPS LifePlan

    ERIC Educational Resources Information Center

    Arendale, David R.

    2008-01-01

    The GPS LifePlan is an interactive resource that helps students succeed in reaching their career, education and personal goals. GPS stands for "GOALS + PLANS = SUCCESS". http://gpslifeplan.org This holistic academic and student development program provides a structure for students to define their goals and helps them establish plans to…

  1. Strategic Planning Techniques: Matching External Assessment with Internal Audit.

    ERIC Educational Resources Information Center

    Groff, Warren H.

    The literature on strategic planning, and the capabilities of Massachusetts system of public postsecondary education were assessed, as part of a 1981 leadership seminar. Teams from all public postsecondary education institutions in the state reviewed the basic concepts of strategic planning; critically analyzed the environment external to their…

  2. CEBAF - environmental protection program plan

    SciTech Connect

    1995-10-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

  3. 2002 WIPP Environmental Monitoring Plan

    SciTech Connect

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  4. Applying environmental externalities to US Clean Coal Technologies for Asia. [Including external environmental costs

    SciTech Connect

    Szpunar, C.B.; Gillette, J.L.

    1993-01-01

    The United States is well positioned to play an expanding role in meeting the energy technology demands of the Asian Pacific Basin, including Indonesia, Thailand, and the Republic of China (ROC-Taiwan). The US Department of Energy Clean Coal Technology (CCT) Demonstration Program provides a proving ground for innovative coal-related technologies that can be applied domestically and abroad. These innovative US CCTs are expected to satisfy increasingly stringent environmental requirements while substantially improving power generation efficiencies. They should also provide distinct advantages over conventional pulverized coal-fired combustors. Finally, they are expected to be competitive with other energy options currently being considered in the region. This paper presents potential technology scenarios for Indonesia, Thailand, and the ROC-Taiwan and considers an environmental cost-benefit approach employing a newly developed method of applying environmental externalities. Results suggest that the economic benefits from increased emission control can indeed be quantified and used in cost-benefit comparisons, and that US CCTs can be very cost effective in reducing emissions.

  5. Environmental Monitoring Plan, Revision 6

    SciTech Connect

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  6. External tank project new technology plan. [development of space shuttle external tank system

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A production plan for the space shuttle external tank configuration is presented. The subjects discussed are: (1) the thermal protection system, (2) thermal coating application techniques, (3) manufacturing and tooling, (4) propulsion system configurations and components, (5) low temperature rotating and sliding joint seals, (6) lightning protection, and (7) nondestructive testing technology.

  7. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  8. Environmental Monitoring Plan, Revision 5

    SciTech Connect

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  9. Corrective Action Planning for Environmental Compliance Deficiencies

    SciTech Connect

    Sigmon, C. F.; Ashburn, S. A.; Jolley, R. L.; Smith, A. A.; Mercer, A. E.; Oeulette, B.; Renz, K.; Scott, S.

    1995-01-01

    Effective corrective action planning is one of the cornerstones of an effective environmental management program. Alternatively, ineffective planning can highlight an installation`s unwillingness or inability to effectively address environmental compliance deficiencies. The following paper discusses several guidelines to consider in corrective action planning to ensure that plans benefit rather than harm an installation`s overall environmental management program.

  10. Environmental externalities: Applying the concept to Asian coal-based power generation. [Includes external environmental and societal costs and methods of evaluating them

    SciTech Connect

    Szpunar, C.B.; Gillette, J.L.

    1993-03-01

    This report examines the concept of environmental externality. It discusses various factors -- the atmospheric transformations, relationship of point-source emissions to ambient air quality, dose-response relationships, applicable cause-and-effect principles, and risk and valuation research -- that are considered by a number of state utilities when they apply the environmental externality concept to energy resource planning. It describes a methodology developed by Argonne National Laboratory for general use in resource planning, in combination with traditional methods that consider the cost of electricity production. Finally, it shows how the methodology can be applied in Indonesia, Thailand, and Taiwan to potential coal-fired power plant projects that will make use of clean coal technologies.

  11. Generating AN Optimum Treatment Plan for External Beam Radiation Therapy.

    NASA Astrophysics Data System (ADS)

    Kabus, Irwin

    1990-01-01

    The application of linear programming to the generation of an optimum external beam radiation treatment plan is investigated. MPSX, an IBM linear programming software package was used. All data originated from the CAT scan of an actual patient who was treated for a pancreatic malignant tumor before this study began. An examination of several alternatives for representing the cross section of the patient showed that it was sufficient to use a set of strategically placed points in the vital organs and tumor and a grid of points spaced about one half inch apart for the healthy tissue. Optimum treatment plans were generated from objective functions representing various treatment philosophies. The optimum plans were based on allowing for 216 external radiation beams which accounted for wedges of any size. A beam reduction scheme then reduced the number of beams in the optimum plan to a number of beams small enough for implementation. Regardless of the objective function, the linear programming treatment plan preserved about 95% of the patient's right kidney vs. 59% for the plan the hospital actually administered to the patient. The clinician, on the case, found most of the linear programming treatment plans to be superior to the hospital plan. An investigation was made, using parametric linear programming, concerning any possible benefits derived from generating treatment plans based on objective functions made up of convex combinations of two objective functions, however, this proved to have only limited value. This study also found, through dual variable analysis, that there was no benefit gained from relaxing some of the constraints on the healthy regions of the anatomy. This conclusion was supported by the clinician. Finally several schemes were found that, under certain conditions, can further reduce the number of beams in the final linear programming treatment plan.

  12. Savannah River Site Environmental Implementation Plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  13. Environmental planning and decision making

    SciTech Connect

    Ortolano, L.

    1984-01-01

    Environmental planning is a multidisciplinary field encompassing biology, engineering, geography, the earth sciences, and landscape architecture among other subjects. This book was written in textbook format to provide an introduction to the field. It is suitable for students at all levels, professionals, and general readers interested in the quality of the environment. It includes a list of key concepts and terms for each chapter, references for further study, discussion questions, and a subject index. Contents: Residuals management. Environmental impact assessment. Land use and the environment. Index.

  14. Electricity generation and environmental externalities: Case studies, September 1995

    SciTech Connect

    1995-09-28

    Electricity constitutes a critical input in sustaining the Nation`s economic growth and development and the well-being of its inhabitants. However, there are byproducts of electricity production that have an undesirable effect on the environment. Most of these are emissions introduced by the combustion of fossil fuels, which accounts for nearly 70 percent of the total electricity generated in the United States. The environmental impacts (or damages) caused by these emissions are labeled environmental ``externalities.`` Included in the generic term ``externality`` are benefits or costs resulting as an unintended byproduct of an economic activity that accrue to someone other than the parties involved in the activity. This report provides an overview of the economic foundation of externalities, the Federal and State regulatory approaches, and case studies of the impacts of the externality policies adopted by three States.

  15. 75 FR 26270 - Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... FEMA's environmental planning and historic preservation (EHP) review, EHP analysis preparation, and execution of EHP mitigation measures. The draft Environmental Planning and Historic Preservation...

  16. Firm behavior, environmental externalities and public policy

    NASA Astrophysics Data System (ADS)

    Curtis, Earnest Markell, IV

    This dissertation consists of three essays which examine environmental policy, employer mandates and energy consumption. The essays explore how firms respond to government policies such as environmental regulation and employer mandates. Understanding how firms adjust to government policies is crucial to law makers attempting to design optimal policies that maximize net benefits to society. The first essay, titled Who Loses under Power Plant Cap-and-Trade Programs tests how a major cap-and-trade program, known as the NOx Budget Trading Program (NBP), affected labor markets in the region where it was implemented. The cap-and-trade program dramatically decreased levels of NOx emissions and added substantial costs to energy producers. Using a triple-differences approach that takes advantage of the geographic and time variation of the program as well as variation in industry energy-intensity levels, I examine how employment dynamics changed in manufacturing industries whose production process requires high levels of energy. After accounting for a variety of flexible state, county and industry trends, I find that employment in the manufacturing sector dropped by 1.7% as a result of the NBP. Young workers experienced the largest employment declines and earnings of newly hired workers fell after the regulation began. Employment declines are shown to have occurred primarily through decreased hiring rates rather than increased separation rates, thus mitigating the impact on incumbent workers. The second essay, titled Evaluating Workplace Mandates with Flows versus Stocks: An Application to California Paid Family Leave uses an underexploited data set to examine the impact of the California Paid Family Leave program on employment outcomes for young women. Most papers on mandated benefits examine labor outcomes by looking at earnings and employment levels of all workers. Examining these levels will be imprecise if the impacts of the program develop over time and firms are wary

  17. Environmental health discipline science plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of this plan is to provide a conceptual strategy for NASA's Life Sciences Division research and development activities in environmental health. It covers the significant research areas critical to NASA's programmatic requirements for the Extended Duration Orbiter, Space Station Freedom, and exploration mission science activities. These science activities include ground-based and flight; basic, applied, and operational; animal and human subjects; and research and development. This document summarizes the history and current status of the program elements, outlines available knowledge, establishes goals and objectives, identifies scientific priorities, and defines critical questions in the three disciplines: (1) Barophysiology, (2) Toxicology, and (3) Microbiology. This document contains a general plan that will be used by both NASA Headquarters Program Officers and the field centers to review and plan basic, applied, and operational research and development activities, both intramural and extramural, in this area. The document is divided into sections addressing these three disciplines.

  18. Parental Knowledge is an Environmental Influence on Adolescent Externalizing

    PubMed Central

    Marceau, Kristine; Narusyte, Jurgita; Lichtenstein, Paul; Ganiban, Jody M.; Spotts, Erica L.; Reiss, David; Neiderhiser, Jenae M.

    2014-01-01

    Background There is evidence both that parental monitoring is an environmental influence serving to diminish adolescent externalizing problems and that this association may be driven by adolescents’ characteristics via genetic and/or environmental mechanisms, such that adolescents with fewer problems tell their parents more, and therefore appear to be better monitored. Without information on how parents’ and children’s genes and environments influence correlated parent and child behaviors, it is impossible to clarify the mechanisms underlying this association. Method The present study used the Extended Children of Twins model to distinguish types of gene-environment correlation and direct environmental effects underlying associations between parental knowledge and adolescent (age 11-22 years) externalizing behavior with a Swedish sample of 909 twin parents and their adolescent offspring and a US-based sample of 405 White adolescent siblings and their parents. Results Results suggest that more parental knowledge is associated with less adolescent externalizing via a direct environmental influence independent of any genetic influences. There was no evidence of a child-driven explanation of the association between parental knowledge and adolescent externalizing problems. Conclusions In this sample of adolescents, parental knowledge exerted an environmental influence on adolescent externalizing after accounting for genetic influences of parents and adolescents. Because the association between parenting and child development originates in the parent, treatment for adolescent externalizing must not only include parents but should focus on altering their parental style. Thus, findings suggest that teaching parents better knowledge-related monitoring strategies is likely to help reduce externalizing problems in adolescents. PMID:24975929

  19. Implications of environmental externalities assessments for solar thermal powerplants

    NASA Astrophysics Data System (ADS)

    Lee, A. D.; Baechler, M. C.

    1991-03-01

    Externalities are those impacts of one activity on other activities that are not priced in the marketplace. An externality is said to exist when two conditions hold: (1) the utility or operations of one economic agent, A, include nonmonetary variables whose values are chosen by another economic agent, B, without regard to the effects on A, and (2) B does not pay A compensation equal to the incremental costs inflicted on A. Electricity generation involves a wide range of potential and actual environmental impacts. Legislative, permitting, and regulatory requirements directly or indirectly control certain environmental impacts, implicitly causing them to become internalized in the cost of electricity generation. Electricity generation, however, often produces residual environmental impacts that meet the definition of an externality. Mechanisms have been developed by several states to include the costs associated with externalities in the cost-effectiveness analyses of new powerplants. This paper examines these costs for solar thermal plants and applies two states' scoring methodologies to estimate how including externalities would affect the levelized costs of power from a solar plant in the Pacific Northwest. It concludes that including externalities in the economics can reduce the difference between the levelized cost of a coal and solar plant by between 0.74 and 2.42 cents/kWh.

  20. Periodically varying externally imposed environmental effects on population dynamics

    NASA Astrophysics Data System (ADS)

    Ballard, M.; Kenkre, V. M.; Kuperman, M. N.

    2004-09-01

    Effects of externally imposed periodic changes in the environment on population dynamics are studied with the help of a simple model. The environmental changes are represented by the temporal and spatial dependence of the competition terms in a standard equation of evolution. Possible applications of the analysis are on the one hand to bacteria in Petri dishes and on the other to rodents in the context of the spread of the Hantavirus epidemic. The analysis shows that spatiotemporal structures emerge, with interesting features which depend on the interplay of separately controllable aspects of the externally imposed environmental changes.

  1. 75 FR 44255 - EPA Office of External Affairs and Environmental Education Staff Office; Request for Nominations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... AGENCY EPA Office of External Affairs and Environmental Education Staff Office; Request for Nominations of Candidates for the National Environmental Education Advisory Council AGENCY: Environmental... of External Affairs and Environmental Education Staff Office is soliciting applications...

  2. 78 FR 14090 - EPA Office of External Affairs and Environmental Education; Request for Nominations of Candidates...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... AGENCY EPA Office of External Affairs and Environmental Education; Request for Nominations of Candidates for the National Environmental Education Advisory Council (Sub-Committee) AGENCY: Environmental...) Office of External Affairs and Environmental Education Staff Office is soliciting applications,...

  3. Environmental Restoration Quality Program Plan

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  4. Environmental information for military planning.

    PubMed

    Doherty, Victoria; Croft, Darryl; Knight, Ashley

    2013-07-01

    A study was conducted to consider the implications of presenting Environmental Information (EI; information on current environmental features including weather, topography and visibility maps) for military planning to the growing audience of non-technical users; to provide guidance for ensuring usability and for development of a suitable EI interface, and to produce an EI concept interface mock-up to demonstrate initial design ideas. Knowledge was elicited from current EI users and providers regarding anticipated use of EI by non-specialists. This was combined with human factors and cognition expertise to produce guidance for data usability and development of an EI interface. A simple mock-up of an EI concept interface was developed. Recommendations for further development were made including application of the guidance derived, identification of a user test-bed and development of business processes. PMID:23290260

  5. Applied social science for environmental planning

    SciTech Connect

    Millsap, W.

    1983-01-01

    As regions and communities are increasingly affected by the projects, programs, and policies of disparate government and private groups, the skills of social scientists are being called on to aid in the environmental planning process. This volume presents accounts of the many ways in which the social sciences are contributing to environmental planning. The authors address the transition from theory to practice in environmental planning, local-level contributions to the planning process, socioeconomic development and planning needs, and socioenvironmental planning and mitigation procedures.

  6. Environmental externalities: Applying the concept to Asian coal-based power generation

    SciTech Connect

    Szpunar, C.B.; Gillette, J.L.

    1993-03-01

    This report examines the concept of environmental externality. It discusses various factors -- the atmospheric transformations, relationship of point-source emissions to ambient air quality, dose-response relationships, applicable cause-and-effect principles, and risk and valuation research -- that are considered by a number of state utilities when they apply the environmental externality concept to energy resource planning. It describes a methodology developed by Argonne National Laboratory for general use in resource planning, in combination with traditional methods that consider the cost of electricity production. Finally, it shows how the methodology can be applied in Indonesia, Thailand, and Taiwan to potential coal-fired power plant projects that will make use of clean coal technologies.

  7. The concept of externality: Implications for TVA Environmental Research Center

    SciTech Connect

    Foster, T.H.

    1994-06-01

    Pollution of the environment is a result of the economic activities of production and consumption. And although the market system is touted as the superior method of organizing and operating an economic system, society frequently is dissatisfied with some of the side effects. In these cases of market failure, a cry for intervention often is raised to obtain more socially-desirable solutions. Environmental pollution is one symptom of market failure. If the TVA Environmental Research Center is to focus on defining solutions to environmental problems and designing policy options for implementing such solutions, its efforts should benefit from an understanding of why the market fails and how it may be adjusted to produce more socially-desirable results. The purposes of this report are to: (1) promote an appreciation for and understanding of the concept of externality; (2) demonstrate the utility of the concept in the design and packaging of policy and technology for improved environmental performance; (3) provide a brief summary of the externality valuation issue currently being debated by the electric power industry; and (4) identify environmental research and development agenda opportunities or strategic considerations suggested for the Center by this review.

  8. Environmental Planning and Ecology Program Annual Report.

    SciTech Connect

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  9. Environmental monitoring plan - environmental monitoring section. Revision 1

    SciTech Connect

    Wilt, G.C.; Tate, P.J.; Brigdon, S.L.

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  10. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  11. Environmental Adversity Increases Genetic Risk for Externalizing Disorders

    PubMed Central

    Hicks, Brian M.; South, Susan C.; DiRago, Ana C.; Iacono, William G.; McGue, Matt

    2008-01-01

    Background Studies of gene-environment (G-E) interplay in the development of psychiatric and substance use disorders are rapidly accumulating. However, few attempts have been made to integrate findings and articulate general mechanisms of G-E influence in the emergence of psychopathology. Objective Identify patterns of G-E interplay between externalizing (EXT; antisocial behavior and substance use) disorders and several environmental risk factors. Design We used quantitative genetic models to examine how genetic and environmental risk for EXT disorders changes as a function of environmental context. Setting Participants were recruited from the community and took part in a day-long assessment at a university laboratory. Participants The sample consisted of 1315 male and female twin pairs participating in the age 17 assessment of the Minnesota Twin Family Study. Main Outcome Measures Multiple measures and informants were employed to construct a composite of EXT disorders and composite measures of 6 environmental risk factors including academic achievement and engagement, antisocial and prosocial peer affiliation, mother-child and father-child relationship problems, and stressful life events. Results A significant G × E interaction was detected between each environmental risk factor and EXT such that greater environmental adversity was associated with increased genetic risk in EXT. Conclusion Our findings demonstrate that in the context of environmental adversity, genetic factors become more important in the etiology of EXT disorders. The consistency of the results further suggests a general mechanism of environmental influence on EXT disorders regardless of the specific form of the environmental risk. PMID:19487629

  12. Environmental externalities: A survey of state commission actions

    SciTech Connect

    Cohen, S.D.; Eto, J.H.; Goldman, C.A.; Beldock, J.; Crandall, G.

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC`s Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a ``snapshot`` of regulatory developments in an area that is evolving rapidly. 16 refs.

  13. Environmental externalities: A survey of state commission actions

    SciTech Connect

    Cohen, S.D.; Eto, J.H. ); Goldman, C.A. ); Beldock, J. . Office of Buildings and Community Systems); Crandall, G. )

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC's Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a snapshot'' of regulatory developments in an area that is evolving rapidly. 16 refs.

  14. 78 FR 18589 - EPA Office of External Affairs and Environmental Education; Request for Nominations of Candidates...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ... AGENCY EPA Office of External Affairs and Environmental Education; Request for Nominations of Candidates for the National Environmental Education Advisory Council AGENCY: Environmental Protection Agency (EPA... Affairs and Environmental Education (OEAEE) Staff Office is soliciting applications for...

  15. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  16. Idaho National Laboratory Environmental Monitoring Plan

    SciTech Connect

    Joanne L. Knight

    2008-04-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  17. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  18. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect

    Jenifer Nordstrom

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Nonroutine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  19. Legal foundations of environmental planning

    SciTech Connect

    Rose, J.G.

    1983-01-01

    This casebook provides an introduction to the rapidly evolving field of environmental law. In the first section of this work, the author examines the procedure and remedies, as well as the substantive law, of environmental litigation. The two following sections explore statutory and common law approaches to the problems of air and water pollution. The final section of the volume departs from the traditional stuff of environmental practice by examining the problems of litigation in the field of population growth and distribution.

  20. The evaluation of the environmental impact and the external factors of urban transport in Constanta

    NASA Astrophysics Data System (ADS)

    Stanca, C.; Stîngă, V. G.; Georgescu, S.; Cupşa, O. S.

    2015-11-01

    Transport activities are known to have a substantial negative environmental impact especially when referring to the urban transport. Studies have shown that external costs (as accidents, congestion, air emissions, climate change or noise) are an important subject of the European Union, that is why were carried out several research projects. This paper will highlight the current requirements and methodologies used by the European Union regarding the impact of the external costs of urban transport in most of the growth poles of Europe. Taking into consideration that Constanta is considered to be one of the seven major growth poles of Romania for the 2014-2020 period, this study aims at analyzing how the results of similar studies made in others centers of the European Union can be applied in Constanta, showing different methodologies and evaluations regarding the external costs and their impact. We will analyze how the conclusions obtained in previous projects are applicable to data collected by us throughout a field research on the technical description of the means of transport used it this city. As methodology, we will use one that was adopted by the European Union regarding the estimation of urban external costs, taking into consideration that each externality has a different method for estimating it. The results of this study may be useful in developing the sustainable urban mobility plan for Constanta, as a strategic plan design to reduce the impact of urban transport for a better quality of life at present and in the future. Through this paper we will get an insight into the urban transport in Constanta, but also data on external costs generated by the urban transport, given that road transport is considered to be the most polluting transport mode.

  1. Waste Isolation Pilot Plant Environmental Monitoring Plan

    SciTech Connect

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2004-02-19

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  2. 49 CFR 520.25 - External review of draft environmental impact statements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ENVIRONMENTAL IMPACTS Procedures § 520.25 External review of draft environmental impact statements. (a... 49 Transportation 6 2013-10-01 2013-10-01 false External review of draft environmental impact... by law or special expertise with respect to the possible environmental impact involved, and from...

  3. Environmental Health Planning Guide. Revised 1968.

    ERIC Educational Resources Information Center

    Public Health Service (DHEW), Rockville, MD.

    This guide to environmental health planning outlines the process and procedures of bringing together certain fundamental data pertaining to various physical aspects of the environment, including data collection, evaluation, usage, and implementation. The components of such planning programs are listed along with study preparation information.…

  4. Pinellas Plant environmental monitoring plan

    SciTech Connect

    Not Available

    1996-07-01

    The Pinellas Plant Environmental Monitoring Program is comprised of two major activities as follows: effluent monitoring and environmental surveillance. The collection and analysis of samples or measurements of liquid and gaseous effluents for the purpose of characterizing and quantifying contaminants, assessing radiation exposures to members of the public, providing a means to control effluents at or near the point of discharge, and demonstrating compliance with applicable standards and permit requirements. The collection and analysis of samples or direct measurements of air, water, soil, food stuff, biota, and other media from DOE sites and their environs for the purpose of determining compliance with applicable standards and permit requirements, assessing radiation exposure to members of the public, and assessing the effects, if any, on the local environment. Effluent monitoring and environmental surveillance at the Pinellas Plant include monitoring liquid and airborne effluents, groundwater, surface water, soil, and local weather conditions.

  5. Routine Radiological Environmental Monitoring Plan. Volume 1

    SciTech Connect

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  6. Waste Isolation Pilot Plant Environmental Monitoring Plan

    SciTech Connect

    None, None

    2008-03-12

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  7. Hanford Environmental Management Program plan; Revision 1

    SciTech Connect

    DeFigh-Price, C.

    1990-08-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office. Westinghouse Hanford Company has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as regulatory reporting and planning and to facilitate compliance with environmental regulations. Key activities include preparing and/or coordinating waste management and environmental restoration site-wide planning documents, maintaining the Waste Inventory Data System, coordinating site-wide regulatory reporting (SARA Title III, Dangerous Waste Report, etc.), Tri-Party Agreement Administration and Base (nonprogram specific) regulatory permitting and National Environmental Policy Act activities. Fiscal year (FY) 1991 is the first year this activity will be directly funded. This document describes accomplishments in FY 1990, the scope of work funded by this program for FY 1991, the prioritized tasks covered, and the management structure in place. 16 refs., 4 figs., 1 tab.

  8. 78 FR 23928 - EPA Office of External Affairs and Environmental Education; Cancellation of the National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... AGENCY EPA Office of External Affairs and Environmental Education; Cancellation of the National Environmental Education Advisory Council Meetings Scheduled for May 22, 2013 and June 19th, 2013 AGENCY... Agency) Office of External Affairs and Environmental Education (OEAEE) is issuing this notice to...

  9. Guidelines for Analysis of Environmental Health Planning in Developing Countries. Volume 2: Environmental Health Planning. International Health Planning Methods Series.

    ERIC Educational Resources Information Center

    Fraser, Renee White; Shani, Hadasa

    Intended to assist Agency for International Development (AID) officers, advisors, and health officials in incorporating health planning into national plans for economic development, this second of ten manuals in the International Health Planning Methods Series deals with assessment, planning, and evaluation in the field of environmental health.…

  10. Externalizing Problems in Late Childhood as a Function of Prenatal Cocaine Exposure and Environmental Risk

    PubMed Central

    Marini, Victoria A.; Berzenski, Sara R.; Carmody, Dennis P.; Lewis, Michael

    2013-01-01

    Objective To examine whether prenatal cocaine exposure (PCE) predicts externalizing problems in late childhood. Methods Externalizing problems were assessed using caregiver, teacher, and child ratings and a laboratory task when children (N = 179; 74 cocaine exposed) were aged 8–10 years. PCE, environmental risk, sex, neonatal health, other prenatal exposures, and foster care history were examined as predictors of externalizing problems. Results Multiple regression analyses indicated that PCE, environmental risk, and male sex explained significant variance in externalizing problems in late childhood. Models varied by source of information. PCE predicted externalizing problems for child laboratory behavior and interacted with sex because males with PCE reported more externalizing problems. PCE did not predict caregiver or teacher ratings of externalizing problems. Conclusions The effect of PCE on externalizing problems may persist into late childhood. The findings highlight the potential importance of including child-based measures of externalizing problems in studies of prenatal exposure. PMID:23248347

  11. Externality in the nonobese: effects of environmental responsiveness on weight.

    PubMed

    Rodin, J; Slochower, J

    1976-03-01

    The study considered whether external responsiveness in normal weight people would predict changes in eating behavior and weight following major alteration of environmetnal food cues. Normal weight children were tested for externality on measures of eating, slide recall, and extremity of affective responsiveness during the first week of a summer camp, and were weighed biweekly thereafter. There was a significant correlation between externality and weight change, indicating that the more externally responsive the children were, the more weight they gained. The implications of this finding for theories about the development of obesity were considered.

  12. On the Inclusion of Externally Controlled Actions in Action Planning

    ERIC Educational Resources Information Center

    Tsai, Jessica Chia-Chin; Knoblich, Gunther; Sebanz, Natalie

    2011-01-01

    According to ideomotor theories, perceiving action effects produced by others triggers corresponding action representations in the observer. We tested whether this principle extends to actions performed by externally controlled limbs and tools. Participants performed a go-no-go version of a spatial compatibility task in which their own actions…

  13. A Guide for Environmental Health Planning

    ERIC Educational Resources Information Center

    Crawford, Gene M.

    1972-01-01

    Outlines objectives and resources to be assessed in a community environmental health plan. Considers: water; liquid waste disposal; housing maintenance; solid waste disposal; air pollution; food and food protection; rodent control; insect control; migrant labor camps; recreation sites; mobile homes - trailer parks; schools, institutions - public…

  14. Environmental externality and inequality in China: current status and future choices.

    PubMed

    Zhao, Xiaoli; Zhang, Sufang; Fan, Chunyang

    2014-07-01

    Along with China's rapid economic growth, the environmental externality in the country is getting more and more serious. China's environmental externality is accompanied by environmental inequality, which presents two characteristics: First, the health loss caused by environmental externality is concentrated in the elderly and children. We take Beijing as an empirical analysis to conclude that children (0-4 years old) are the largest group suffered from respiratory disease; while the seniors are the largest group suffered from cardiovascular disease. Second, China's environmental inequality is mainly caused by the transfer of industries from urban to rural areas/suburbs. The villagers in poor rural areas are the biggest victims. China's environmental inequality is reflected particularly by the phenomenon of "cancer villages" which has existed ever since the end of 1970s. Finally, policy recommendations are provided for reducing China's environmental externality and inequality.

  15. The relationship between the genetic and environmental influences on common externalizing psychopathology and mental wellbeing.

    PubMed

    Kendler, Kenneth S; Myers, John M; Keyes, Corey L M

    2011-12-01

    To determine the relationship between the genetic and environmental risk factors for externalizing psychopathology and mental wellbeing, we examined detailed measures of emotional, social and psychological wellbeing, and a history of alcohol-related problems and smoking behavior in the last year in 1,386 individual twins from same-sex pairs from the MIDUS national US sample assessed in 1995. Cholesky decomposition analyses were performed withthe Mx program. The best fit model contained one highly heritable common externalizing psychopathology factor for both substance use/abuse measures, and one strongly heritable common factor for the three wellbeing measures. Genetic and environmental risk factors for externalizing psychopathology were both negatively associated with levels of mental wellbeing and accounted for, respectively, 7% and 21% of its genetic and environmental influences. Adding internalizing psychopathology assessed in the last year to the model, genetic risk factors unique for externalizing psychopathology were now positively related to levels of mental wellbeing, although accounting for only 5% of the genetic variance. Environmental risk factors unique to externalizing psychopathology continued to be negatively associated with mental wellbeing, accounting for 26% of the environmental variance. When both internalizing psychopathology and externalizing psychopathology are associated with mental wellbeing, the strongest risk factors for low mental wellbeing are genetic factors that impact on both internalizing psychopathology and externalizing psychopathology, and environmental factors unique to externalizing psychopathology. In this model, genetic risk factors for externalizing psychopathology predict, albeit weakly, higher levels of mental wellbeing.

  16. 76 FR 77997 - Office of External Affairs and Environmental Education; Request for Nominations of Candidates for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ...The U.S. Environmental Protection Agency (EPA or Agency) Office of External Affairs and Environmental Education Staff Office is soliciting applications for environmental education professionals for consideration on the National Environmental Education Advisory Council (NEEAC). There are eleven vacancies on the Advisory Council that must be filled. Additional avenues and resources may be......

  17. Master environmental plan for Fort Devens, Massachusetts

    SciTech Connect

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. . Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  18. Effects of Internal and External Supports on Preschool Children's Event Planning

    ERIC Educational Resources Information Center

    Shapiro, Lauren R.; Hudson, Judith A.

    2004-01-01

    Two experiments examined how internal and external supports affected planning for enabling (logically linked) and conventional (arbitrarily linked) events. In Experiment 1, preschoolers were given either two or four training sessions before planning and enacting invariably sequenced art projects. In Experiment 2, preschoolers were given two…

  19. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  20. Waste Isolation Pilot Plant Environmental Monitoring Plan

    SciTech Connect

    Westinghouse Electric Company Waste Isolation Division

    1999-09-29

    DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures, which implement

  1. Planning and Scheduling for Environmental Sensor Networks

    NASA Astrophysics Data System (ADS)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  2. Planning environmental sanitation programmes in emergencies.

    PubMed

    Harvey, Peter A; Reed, Robert A

    2005-06-01

    Environmental sanitation programmes are vital for tackling environmental-related disease and ensuring human dignity in emergency situations. If they are to have maximum impact they must be planned in a rapid but systematic manner. An appropriate planning process comprises five key stages: rapid assessment and priority setting; outline programme design; immediate action; detailed programme design; and implementation. The assessment should be based on carefully selected data, which are analysed via comparison with suitable minimum objectives. How the intervention should be prioritised is determined through objective ranking of different environmental sanitation sector needs. Next, a programme design outline is produced to identify immediate and longer-term intervention activities and to guarantee that apposite resources are made available. Immediate action is taken to meet acute emergency needs while the detailed programme design takes shape. This entails in-depth consultation with the affected community and comprehensive planning of activities and resource requirements. Implementation can then begin, which should involve pertinent management and monitoring strategies. PMID:15910646

  3. Environmental Restoration Program Document Control Plan

    SciTech Connect

    Montgomery, L.M.

    1993-09-01

    This Environmental Restoration (ER) Program Document Control Plan has been developed to comply with the document control system requirements of the US Department of Energy, Richland Operations Office (RL), the Hanford Federal Facility and the ER Program. One of the five components, or summary subprojects, of the Environmental Restoration (ER) Program is program management and support, which includes both management systems development and information and data management. Efforts within the management systems development area include the creation of a document control plan. Westinghouse Hanford Company (WHC) has developed and established an overall document control system that governs the methods by which all WHC documents are generated, maintained, and disposed of. The ER Program performing organizations within WHC utilize the established WHC document control systems to the maximum extent possible. These systems are discussed in Chapters 3.0 and 4.0 of this plan. In addition, this plan describes the documents that require control within the ER Program and how they will be controlled.

  4. External Scan 2002. Environmental Scan of the Greater Sacramento Area.

    ERIC Educational Resources Information Center

    Beachler, Judith A.

    This is the fourth in a series of reports that provide a comprehensive look at the external environment impacting Los Rios Community College District (LRCCD), California. It summarizes the social, economic, and political changes at the state and national levels in general, and in the Sacramento-Yolo Consolidated Metropolitan Statistical Area…

  5. Environmental planning and management in Greater Johannesburg.

    PubMed

    Von Schirnding, Y E

    1996-03-01

    This article describes the actions among urban environmental, management, and development planners in Greater Johannesburg, South Africa. Initiatives, such as the Healthy Cities Project and Model Communities, are being integrated into an environmental management and development approach that attains the goals of Agenda 21. Greater Johannesburg has housing shortages and homelessness. Priority needs include the areas of housing, water, electricity, public transportation, and sanitation. Clean water and air are inequitably distributed. Other key environmental problems include illegal dumping, inadequate waste disposal, poor environmental hygiene in overcrowded inner city areas, lack of open spaces, flooding, and water scarcities. The newly formed metropolitan authority offers opportunities to improve coordination and integration of environmental problems. Stakeholders from government at all levels, politicians, nongovernmental organizations, and the business sector formed an intersectoral, interdepartmental environment management committee in 1995. Stakeholders will integrate Agenda 21 within broader urban development plans and processes. The executive committee and the full council approved a set of guiding principles on environmental policy and an administrative framework for management. Four workshops were held to ensure a participatory consultation process in 1995. The WHO Collaborating Center for Urban Health will be used to facilitate the work of the Greater Johannesburg Metropolitan Council. Changes are being made in the way local governments work.

  6. Environmental regulations alter resource planning methodology

    SciTech Connect

    Castro, R.D.

    1997-05-01

    The advent of regulations governing the volume of air pollutants emitted may force radical alterations in traditional economics-based resource planning. A review of the effect on regional resource planning of adopted emission rules for the Los Angeles basin may benefit utility resource planners. The 1990 amendments to the Clean Air Act (Amendments) concerning utility generation has prompted a reassessment of resource planning methodology. The current methodology does not account for the restrictive NOx emission limits imposed by the Amendments. A new procedure needs to be developed that considers environmental impacts in the selection of the most economical resource plan. Historically, economic aspects of dispatch and generation has dominated the focus of resource planners; for most of the larger utilities, resource planning usually entailed performing analyses with convolution-based production costing software. This method is used because it resolves the prohibitively large run times associated with the exhaustively comprehensive enumeration method of matching loads with resources. An alternative method of analysis, Monte Carlo, requires a larger number of iterations to achieve the precision of convolution. Additionally, the Monte Carlo method`s of convergence, as compared to the convolution method, is much more sensitive to the number of operating units, the number of operating states, the range of input data, and the convergence criteria.

  7. A plan for the handling of externally contaminated livestock.

    PubMed

    McMillan, Dayton; Johnson, Thomas; Guo, Yuanqing; Brandl, Alexander

    2011-11-01

    Nuclear accidents and access to radiological weapons for terrorist organizations and countries with hostile intentions towards the United States are realistic scenarios in the current global landscape. A dispersion of radionuclides can result from a nuclear weapon detonation or from a nuclear accident occurring in facilities handling or using radioactive material, such as nuclear power reactors. Any target of a radiological dispersal device (RDD) or an attack with a nuclear weapon and the surrounding area of a reactor accident could be subject to a significant amount of fallout and radioactive contamination. Therefore, a nuclear event in close proximity to agricultural areas will cause significant concern regarding the contamination of food products. In order to respond quickly and effectively to a large amount of contaminated agricultural products, such as livestock, a prepared and effective plan for handling and processing of these products is necessary. A protocol outlining the evaluation of and procedures for handling and processing radioactively contaminated livestock is proposed, to ensure safe animal food production and economic stability in the livestock industry in the wake of such a nuclear or radiological event. An evaluation of the salvageability of the contaminated livestock is performed based on the degree of exposure, the cost of decontamination, expected demand for food products, and economic impact to the owner/producer. Important factors that impact the salvageability of affected livestock are listed and analyzed to support the decision process for handling contaminated animals. PMID:21968824

  8. A plan for the handling of externally contaminated livestock.

    PubMed

    McMillan, Dayton; Johnson, Thomas; Guo, Yuanqing; Brandl, Alexander

    2011-11-01

    Nuclear accidents and access to radiological weapons for terrorist organizations and countries with hostile intentions towards the United States are realistic scenarios in the current global landscape. A dispersion of radionuclides can result from a nuclear weapon detonation or from a nuclear accident occurring in facilities handling or using radioactive material, such as nuclear power reactors. Any target of a radiological dispersal device (RDD) or an attack with a nuclear weapon and the surrounding area of a reactor accident could be subject to a significant amount of fallout and radioactive contamination. Therefore, a nuclear event in close proximity to agricultural areas will cause significant concern regarding the contamination of food products. In order to respond quickly and effectively to a large amount of contaminated agricultural products, such as livestock, a prepared and effective plan for handling and processing of these products is necessary. A protocol outlining the evaluation of and procedures for handling and processing radioactively contaminated livestock is proposed, to ensure safe animal food production and economic stability in the livestock industry in the wake of such a nuclear or radiological event. An evaluation of the salvageability of the contaminated livestock is performed based on the degree of exposure, the cost of decontamination, expected demand for food products, and economic impact to the owner/producer. Important factors that impact the salvageability of affected livestock are listed and analyzed to support the decision process for handling contaminated animals.

  9. Environmental Restoration Quality Program Plan. Environmental Restoration Program

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  10. Reprint of: environmental information for military planning.

    PubMed

    Doherty, Victoria; Croft, Darryl; Knight, Ashley

    2013-11-01

    A study was conducted to consider the implications of presenting Environmental Information (EI; information on current environmental features including weather, topography and visibility maps) for military planning to the growing audience of non-technical users; to provide guidance for ensuring usability and for development of a suitable EI interface, and to produce an EI concept interface mock-up to demonstrate initial design ideas. Knowledge was elicited from current EI users and providers regarding anticipated use of EI by non-specialists. This was combined with human factors and cognition expertise to produce guidance for data usability and development of an EI interface. A simple mock-up of an EI concept interface was developed. Recommendations for further development were made including application of the guidance derived, identification of a user test-bed and development of business processes. PMID:23876986

  11. Bayesian statistics in environmental engineering planning

    SciTech Connect

    Englehardt, J.D.; Simon, T.W.

    1999-07-01

    Today's engineer must be able to quantify both uncertainty due to information limitations, and the variability of natural processes, in order to determine risk. Nowhere is this emphasis on risk assessment more evident than in environmental engineering. The use of Bayesian inference for the rigorous assessment of risk based on available information is reviewed in this paper. Several example environmental engineering planning applications are presented: (1) assessment of losses involving the evaluation of proposed revisions to the South Florida Building Code after Hurricane Andrew; (2) development of a model to predict oil spill consequences due to proposed changes in the oil transportation network in the Gulf of Mexico; (3) studies of ambient concentrations of perchloroethylene surrounding dry cleaners and of tire particulates in residential areas near roadways in Miami, FL; (4) risk assessment from contaminated soils at a cleanup of an old transformer dump site.

  12. Environmental Restoration and Waste Management: Strategic plan

    SciTech Connect

    Not Available

    1994-09-01

    The Brookhaven National Laboratory (BNL) site is currently divided into five major areas, Operable Units (OUs), and several Areas of Concern (AOCs), which are the focus of investigation and clean-up. The primary environmental concern is groundwater contamination and a major emphasis of the restoration activities is focused on this medium. Each year, BNL generates 60 tons of hazardous waste and 7,000 to 8,000 cubic feet of radioactive waste that result from research activities. These wastes are collected at a central location, packaged and shipped off site for disposal. The operations for Hazardous and Radioactive Waste Management are conducted in compliance with EPA and DOE regulations. BNL has continued to actively pursue means by which these wastes may be minimized. Activities in both the remediation and waste management arenas are intimately connected with the future vision of BNL. The long-range goal for remediation in conjunction with vigorous monitoring of BNL`s activities is to restore the site and maintain strong environmental controls. The goals of the waste minimization program include activities to find environmentally safe alternatives to materials currently in use. By careful planning, BNL will minimize the amount of all waste, including sanitary, that is generated on site.

  13. Learning for Sustainability: NSW Environmental Education Plan, 2002-05.

    ERIC Educational Resources Information Center

    2002

    This document is the first three-year environmental education plan for New South Wales (NSW), Australia. The plan is guided by a vision to achieve effective and integrated environmental education which builds the capacity of the people of NSW to be informed and active participants in moving society towards sustainability. The plan's priority…

  14. Information and issues related to the quantification of environmental externalities for new powerplants

    SciTech Connect

    Lee, A.D.; Callaway, J.M.; Glantz, C.S.; Baechler, M.C.; Foley, L.O.

    1990-10-01

    This report provides background information for the Bonneville Power Administration (Bonneville) in its efforts to quantify the environmental externalities associated with new electricity resources. A more detailed companion document has been provided to Bonneville for internal use. This report defines what is meant by externalities, particularly in the context of electricity resources. It outlines the economics issues associated with assigning an economic value, such as cents per kilowatt hour, to the residual environmental impacts of electricity powerplants. It examines two generic theoretical approaches for estimating such values and discusses their advantages and disadvantages. The report also addresses the need to include relevant stages in the fuel cycle in estimating the costs of externalities. The fuel-cycle concept is defined and its importance is discussed. The approaches used by several states to quantify externalities are described. A review of the valuation efforts of various states and utilities indicates that three states have actually developed methodologies for assigning economic values to externalities. Information that Bonneville may need to request from resource developers to quantify externalities is discussed, and an appendix presents suggested forms for obtaining the required information. Summary information also is presented on models for analyzing the dispersion of powerplant plumes for the purpose of estimating environmental externality costs. 34 refs., 1 fig., 4 tabs.

  15. PLAN or get SLAM'ed: Optimal management of invasive species in the presence of indirect health externalities.

    PubMed

    Jones, Benjamin A; McDermott, Shana M; Chermak, Janie M

    2016-09-15

    This paper examines invasive species management when invasive species impact health outcomes indirectly through changes to environmental quality. For example, the emerald ash borer (EAB) has destroyed millions of ash trees throughout North America and has the potential to impact rates of cardiorespiratory mortality and morbidity through ash trees' ability to capture airborne pollutants. Optimal management inclusive of indirect health externalities may be different than status quo plans because the links between nature and health are complex, dynamic, and spatially heterogeneous. We produce a novel dynamic bioeconomic-health model to determine optimal EAB management in the face of such health effects. Our results show that including health increases net benefits of management substantially and that a "one size fits all" management approach is suboptimal given forest cover and demographic spatial heterogeneity. Net benefits to society are 873% higher and air pollution related mortality incidence is 82% lower when health externalities are included in management profiles using insecticide treatments and non-ash tree preemptive plantings without removal. Additionally, constrained managers optimally substitute toward preemptive tree plantings and away from insecticide use in the presence of indirect health externalities as a way to minimize disruptions to air quality. This paper has policy implications for the optimal management of environmental amenities. PMID:27318589

  16. PLAN or get SLAM'ed: Optimal management of invasive species in the presence of indirect health externalities.

    PubMed

    Jones, Benjamin A; McDermott, Shana M; Chermak, Janie M

    2016-09-15

    This paper examines invasive species management when invasive species impact health outcomes indirectly through changes to environmental quality. For example, the emerald ash borer (EAB) has destroyed millions of ash trees throughout North America and has the potential to impact rates of cardiorespiratory mortality and morbidity through ash trees' ability to capture airborne pollutants. Optimal management inclusive of indirect health externalities may be different than status quo plans because the links between nature and health are complex, dynamic, and spatially heterogeneous. We produce a novel dynamic bioeconomic-health model to determine optimal EAB management in the face of such health effects. Our results show that including health increases net benefits of management substantially and that a "one size fits all" management approach is suboptimal given forest cover and demographic spatial heterogeneity. Net benefits to society are 873% higher and air pollution related mortality incidence is 82% lower when health externalities are included in management profiles using insecticide treatments and non-ash tree preemptive plantings without removal. Additionally, constrained managers optimally substitute toward preemptive tree plantings and away from insecticide use in the presence of indirect health externalities as a way to minimize disruptions to air quality. This paper has policy implications for the optimal management of environmental amenities.

  17. Operational Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect

    Perkins, C.J.

    1994-08-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and operational environmental monitoring performed by Westinghouse Hanford Company as it implements the Operational Environmental Monitoring program. This plan applies to all sampling and monitoring activities performed by Westinghouse Hanford Company in implementing the Operational Environmental Monitoring program at the Hanford Site.

  18. A Treatment Planning Method for Sequentially Combining Radiopharmaceutical Therapy and External Radiation Therapy;External beam therapy; Radiopharmaceutical therapy; Three-dimensional dosimetry; Treatment planning

    SciTech Connect

    Hobbs, Robert F.; McNutt, Todd; Baechler, Sebastien; He Bin; Esaias, Caroline E.; Frey, Eric C.; Loeb, David M.; Wahl, Richard L.; Shokek, Ori; Sgouros, George

    2011-07-15

    Purpose: Effective cancer treatment generally requires combination therapy. The combination of external beam therapy (XRT) with radiopharmaceutical therapy (RPT) requires accurate three-dimensional dose calculations to avoid toxicity and evaluate efficacy. We have developed and tested a treatment planning method, using the patient-specific three-dimensional dosimetry package 3D-RD, for sequentially combined RPT/XRT therapy designed to limit toxicity to organs at risk. Methods and Materials: The biologic effective dose (BED) was used to translate voxelized RPT absorbed dose (D{sub RPT}) values into a normalized total dose (or equivalent 2-Gy-fraction XRT absorbed dose), NTD{sub RPT} map. The BED was calculated numerically using an algorithmic approach, which enabled a more accurate calculation of BED and NTD{sub RPT}. A treatment plan from the combined Samarium-153 and external beam was designed that would deliver a tumoricidal dose while delivering no more than 50 Gy of NTD{sub sum} to the spinal cord of a patient with a paraspinal tumor. Results: The average voxel NTD{sub RPT} to tumor from RPT was 22.6 Gy (range, 1-85 Gy); the maximum spinal cord voxel NTD{sub RPT} from RPT was 6.8 Gy. The combined therapy NTD{sub sum} to tumor was 71.5 Gy (range, 40-135 Gy) for a maximum voxel spinal cord NTD{sub sum} equal to the maximum tolerated dose of 50 Gy. Conclusions: A method that enables real-time treatment planning of combined RPT-XRT has been developed. By implementing a more generalized conversion between the dose values from the two modalities and an activity-based treatment of partial volume effects, the reliability of combination therapy treatment planning has been expanded.

  19. Pesticide Environmental Accounting: a method for assessing the external costs of individual pesticide applications.

    PubMed

    Leach, A W; Mumford, J D

    2008-01-01

    The Pesticide Environmental Accounting (PEA) tool provides a monetary estimate of environmental and health impacts per hectare-application for any pesticide. The model combines the Environmental Impact Quotient method and a methodology for absolute estimates of external pesticide costs in UK, USA and Germany. For many countries resources are not available for intensive assessments of external pesticide costs. The model converts external costs of a pesticide in the UK, USA and Germany to Mediterranean countries. Economic and policy applications include estimating impacts of pesticide reduction policies or benefits from technologies replacing pesticides, such as sterile insect technique. The system integrates disparate data and approaches into a single logical method. The assumptions in the system provide transparency and consistency but at the cost of some specificity and precision, a reasonable trade-off for a method that provides both comparative estimates of pesticide impacts and area-based assessments of absolute impacts. PMID:17604888

  20. Pesticide Environmental Accounting: a method for assessing the external costs of individual pesticide applications.

    PubMed

    Leach, A W; Mumford, J D

    2008-01-01

    The Pesticide Environmental Accounting (PEA) tool provides a monetary estimate of environmental and health impacts per hectare-application for any pesticide. The model combines the Environmental Impact Quotient method and a methodology for absolute estimates of external pesticide costs in UK, USA and Germany. For many countries resources are not available for intensive assessments of external pesticide costs. The model converts external costs of a pesticide in the UK, USA and Germany to Mediterranean countries. Economic and policy applications include estimating impacts of pesticide reduction policies or benefits from technologies replacing pesticides, such as sterile insect technique. The system integrates disparate data and approaches into a single logical method. The assumptions in the system provide transparency and consistency but at the cost of some specificity and precision, a reasonable trade-off for a method that provides both comparative estimates of pesticide impacts and area-based assessments of absolute impacts.

  1. Analysing the external supply chain risk driver competitiveness: a risk mitigation framework and business continuity plan.

    PubMed

    Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua

    2010-11-01

    Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience. PMID:21177223

  2. Analysing the external supply chain risk driver competitiveness: a risk mitigation framework and business continuity plan.

    PubMed

    Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua

    2010-11-01

    Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.

  3. Environmental Measurements Laboratory 2002 Unit Performance Plan

    SciTech Connect

    2001-10-01

    This EML Unit Performance Plan provides the key goals and performance measures for FY 2002 and continuing to FY 2003. The purpose of the Plan is to inform EML's stakeholders and customers of the Laboratory's products and services, and its accomplishments and future challenges. Also incorporated in the Unit Performance Plan is EML's Communication Plan for FY 2002.

  4. Environmental performance of wastewater reuse systems: impact of system boundaries and external conditions.

    PubMed

    Baresel, Christian; Dalgren, Lena; Almemark, Mats; Lazic, Aleksandra

    2016-01-01

    Wastewater reclamation will be a significant part of future water management and the environmental assessment of various treatment systems to reuse wastewater has become an important research field. The secondary treatment process and sludge handling on-site are, especially, electricity demanding processes due to aeration, pumping, mixing, dewatering, etc. used for operation and are being identified as the main contributor for many environmental impacts. This study discusses how the environmental performance of reuse treatment systems may be influenced by surrounding conditions. This article illustrates and discusses the importance of factors commonly treated as externalities and as such not being included in optimization strategies of reuse systems, but that are necessary to environmentally assess wastewater reclamation systems. This is illustrated by two up-stream and downstream processes; electricity supply and the use of sludge as fertilizer commonly practiced in regions considered for wastewater reclamation. The study shows that external conditions can have a larger impact on the overall environmental performance of reuse treatment systems than internal optimizations could compensate for. These results imply that a more holistic environmental assessment of reuse schemes could provide less environmental impacts as externalities could be included in measures to reduce the overall impacts. PMID:27003080

  5. 77 FR 37432 - Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... Springfield Plateau Regional Restoration Plan and Environmental Assessment (77 FR 1717). The public comment... Fish and Wildlife Service Final Springfield Plateau Regional Restoration Plan and Environmental... the Final Springfield Plateau Regional Restoration Plan (Plan) and Environmental Assessment...

  6. Active Sites Environmental Monitoring Program: Program plan

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1992-02-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of transuranic (TRU) waste and active low-level waste (LLW) facilities at Oak Ridge National Laboratory (ORNL) in accordance with US Department of Energy (DOE) Order 5820.2A. Active LLW facilities in Solid Waste Storage Area (SWSA) 6 include Tumulus I and Tumulus II, the Interim Waste Management Facility (IWMF), LLW silos, high-range wells, asbestos silos, and fissile wells. The tumulus pads and IWMF are aboveground, high-strength concrete pads on which concrete vaults containing metal boxes of LLW are placed; the void space between the boxes and vaults is filled with grout. Eventually, these pads and vaults will be covered by an engineered multilayered cap. All other LLW facilities in SWSA 6 are below ground. In addition, this plan includes monitoring of the Hillcut Disposal Test Facility (HDTF) in SWSA 6, even though this facility was completed prior to the data of the DOE order. In SWSA 5 North, the TRU facilities include below-grade engineered caves, high-range wells, and unlined trenches. All samples from SWSA 6 are screened for alpha and beta activity, counted for gamma-emitting isotopes, and analyzed for tritium. In addition to these analytes, samples from SWSA 5 North are analyzed for specific transuranic elements.

  7. Waste Feed Delivery Environmental Permits and Approvals Plan

    SciTech Connect

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  8. Global Environmental Planning at the Technical University of Catalonia

    ERIC Educational Resources Information Center

    Ferrer-Balas, Didac

    2004-01-01

    In 1996 the Technical University of Catalonia (UPC) adopted an Environment Plan which incorporated classical technical education, promoting multidisciplinary environmental research, and improving the environmental performance of university life as a whole. This paper outlines the first environment plan (1996-2001). It discusses its encouraging…

  9. Evaluating California local land use plan's environmental impact reports

    SciTech Connect

    Tang Zhenghong Bright, Elise; Brody, Samuel

    2009-02-15

    Local land use planning has profound impacts on environmental quality; however, few empirical studies have been conducted to systematically measure local land use plans' environmental assessment quality and to identify the factors influencing it. This paper analyzes the quality of 40 Environmental Impact Reports (EIRs) of local jurisdictions' land use plans in California. A plan evaluation protocol defined by five core components and sixty-three indicators is developed to measure the quality of local land use plans' EIRs. The descriptive results indicate that the local jurisdictions produce relatively good quality on its EIRs, but there is still much room for improvement. There are large variations in the quality of EIRs across local jurisdictions. The regression results further highlight three major factors that can significantly influence local land use plan's EIR quality: number of planners, plan updating ability, and development pressure.

  10. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    SciTech Connect

    Naidu, J.R.; Paquette, D.; Lee, R.

    1996-10-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  11. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  12. Strategic environmental assessment of energy planning tools. A study of Italian regions and provinces

    SciTech Connect

    De Montis, Andrea

    2014-04-01

    SEA has been applied in different ways in EU energy and environmental planning instruments, because different member states have interpreted European Directive 2001/42/CE in a variety of ways. Italy, for example, has only recently completed the integration of the directive into its legislation, through a number of decrees which were approved between 2006 and 2010. As a result SEA practice in Italy is very fragmented, particularly with respect to energy planning, and needs to be steered towards homogeneous quality objectives. The aim of this paper is to study the quality of the SEA reports on the energy and environmental planning tools used by Italian regions and provinces. We study nine cases and use the methodology suggested by Fisher (2010) in his review of the quality of SEA. To be more precise, we integrate the views of external evaluators with those of a selection of the personnel directly involved in preparing the plans. Our results show that there are some differences in the quality scores given by the outsiders and insiders, although the two groups identified similar strengths and weaknesses in implementing SEA. - Highlights: • This is a comparative study on SEA report quality within Italian energy planning tools. • In Italy, the level of SEA implementation on energy planning is still poor. • External academic experts and internal officers assessed SEA reports' quality. • Outsiders and insiders unveil a similar judgement. • Most critical remarks concern consultation, monitoring measures, and follow-up.

  13. [Environmental impact assessment based on planning support system].

    PubMed

    Chen, Wen-Bo; Carsjens, Gerrit-Jan

    2011-02-01

    How to assess environmental impact is one of the keys in land use planning. This article described in detail the concepts of activities, impact zones, functions, and sensitivities, as well as the development of STEPP (strategic tool for integrating environmental aspects in planning procedures) based on Avenue, the secondary developing language of ArcView GIS. The system makes it convenient for planning practitioners exchanging information, and can spatially, visually and quantitatively describe environmental impact and its change. In this study, the urban-rural combination area located between EDE and Veenendaal of The Netherlands was taken as case, and the results indicated that the environment was incorporated well in the planning procedure based on the concepts, and could also demonstrate the effects of planning measures on environment spatially, explicitly, and in real-time, facilitating the participation of planning practitioners and decision-making. Some proposals of how to promote STEEP application in China were suggested.

  14. Foreign direct investment, institutional development, and environmental externalities: evidence from China.

    PubMed

    Wang, Danny T; Chen, Wendy Y

    2014-03-15

    The question of how foreign direct investment (FDI) affects a host country's natural environment has generated much debate but little consensus. Building on an institution-based theory, this article examines how the institutional development of a host setting affects the degree of FDI-related environmental externalities in China (specifically, industrial sulfur dioxide emissions). With a panel data set of 287 Chinese cities, over the period 2002-2009, this study reveals that FDI in general induces negative environmental externalities. Investments from OECD countries increase sulfur dioxide emissions, whereas FDI from Hong Kong, Macau, and Taiwan shows no significant effect. Institutional development reduces the impacts of FDI across the board. By focusing on the moderating role of institutions, this study sheds new light on the long-debated relationships among FDI, institutions, and the environments of the host countries.

  15. Assessment of private economic benefits and positive environmental externalities of tea plantation in China.

    PubMed

    Xue, Hui; Ren, Xiaoyi; Li, Shiyu; Wu, Xu; Cheng, Hao; Xu, Bin; Gu, Baojing; Yang, Guofu; Peng, Changhui; Ge, Ying; Chang, Jie

    2013-10-01

    Tea plantations are rapidly expanding in China and other countries in the tropical and subtropical zones, driven by relatively high private economic benefit. However, the impact of tea plantations on the regional environment, including ecosystem services and disservices are unclear. In this study, we developed an assessment framework for determining the private economic benefits and environmental externalities (the algebraic sum of the regulating services and disservices) of tea plantations in China. Our results showed that tea plantations provided private economic benefits of 5,652 yuan ha(-1) year(-1) (7.6 yuan = 1 USD in 2007) for tea farmers, plus positive environmental externalities of 6,054 yuan ha(-1) year(-1) for the society. The environmental externalities were calculated as the sum of the value of four regulating services, including carbon sequestration (392 yuan ha(-1) year(-1)); soil retention (72 yuan ha(-1) year(-1)); soil fertility protection (3,189 yuan ha(-1) year(-1)) and water conservation (2,685 yuan ha(-1) year(-1)), and three disservices, including CO2 emission (-39 yuan ha(-1) year(-1)), N2O emission (-137 yuan ha(-1) year(-1)) and nonpoint source pollution (-108 yuan ha(-1) year(-1)). Before the private optimal level, the positive environmental externalities can be maintained by private economic benefits; if a social optimal level is required, subsidies from government are necessary.

  16. Education for Environmental Planning and Conservation.

    ERIC Educational Resources Information Center

    Bandhu, Desh, Ed.; Ramanathan, N. L., Ed.

    Presented in these proceedings are the inaugural and presidential addresses, 8 keynote addresses, and 40 contributed papers presented at an international conference on environmental education (EE). Conference recommendations, a synopsis of conference themes/thrusts, resolution on the organization of a national environmental congress, and the Delhi…

  17. School Yard Environmental Projects: A Planning Primer.

    ERIC Educational Resources Information Center

    Megalos, Mark A.; And Others

    This guide describes how to establish successful trails, outdoor classrooms, or other environmental education improvements on rural and urban school grounds. Teachers are encouraged to promote the environmental project as a solution to an existing problem and to include all parties and stakeholders that can benefit from a coordinated environmental…

  18. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  19. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  20. 77 FR 56671 - Draft Shoreline Restoration Management Plan and Environmental Impact Statement for Indiana Dunes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... National Park Service Draft Shoreline Restoration Management Plan and Environmental Impact Statement for... Restoration Management Plan and Environmental Impact Statement, Indiana Dunes National Lakeshore, Indiana. DATES: The Draft Shoreline Restoration Management Plan and Environmental Impact Statement (SRMP) will...

  1. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... National Park Service Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement... Availability of the Draft Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan... Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan for Biscayne National Park,...

  2. Near-facility environmental monitoring quality assurance project plan

    SciTech Connect

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  3. President Jiang Zemin on family planning and environmental protection.

    PubMed

    Jiang, Z

    1997-04-01

    Presented in this brief article are excerpts of a speech given by the Chinese State President and Party Secretary-General Jiang Zemin at the National Forum on Family Planning and Environmental Protection on March 8, 1997. He states that family planning and environmental policies require long-term considerations. Both family planning and environmental matters are correlated and relate to socioeconomic development in China. Population growth will have negative impacts on the environment, and environmental mismanagement will adversely affect people's health and living conditions. The importance of environmental and family planning policies must be known to every household, and these policies must be effectively implemented as part of socioeconomic development programs. Although China's family planning policy has been successful in reducing China's population size and growth, the task ahead of guaranteeing a population under 1.3 billion by 2000 is enormous. The challenge will be to implement effective programs in rural and poverty-stricken areas. Family planning should be combined with poverty alleviation and income development. Policies should give priority to poor family planning acceptors. China has made "significant progress in environmental protection," but the public is creating "a higher demand on the quality of the environment." By the year 2000, the trends in environmental pollution and ecological destruction must be controlled and the quality of the environment improved. By 2010, there should be evidence of environmental improvements in urban areas, in degraded situations, and in rural areas. Environmental protection will require the cooperation between all departments, the Communist Party, and the Chinese people.

  4. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  5. NATIONAL METAL FINISHING ENVIRONMENTAL R&D PLAN - AN UPDATE

    EPA Science Inventory

    This document is an update to the National Metal Finishing Environmental R&D Plan (EPA/600/R-97/095), dated September 1997. The 1997 Plan and Update are available on the National Metal Finishing Resource Center's web site, www.nmfrc.org. The primary purpose in preparing an up...

  6. Environmental and Planning Studies at the University of Illinois.

    ERIC Educational Resources Information Center

    Findley, Roger W.

    1979-01-01

    The University of Illinois College of Law has developed a program in environmental and planning studies that includes interdisciplinary instruction, student internships, interdisciplinary and international research by faculty and graduate fellows, and a strong public service element with close ties to state environmental agencies. (JMD)

  7. Guide for Planning a High School Environmental Action Conference.

    ERIC Educational Resources Information Center

    Wanless, Angie, Comp.; And Others

    The purpose of this manual is to provide guidelines and suggestions for people organizing an environmental action conference for high school students. The format and planning suggestions are based on the methods used for a conference organized by the Wisconsin Center for Environmental Education in 1991. The bulk of the manual provides structure…

  8. Environmentally Sound Small-Scale Energy Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Bassan, Elizabeth Ann; Wood, Timothy S., Ed.

    This manual is the fourth volume in a series of publications that provide information for the planning of environmentally sound small-scale projects. Programs that aim to protect the renewable natural resources that supply most of the energy used in developing nations are suggested. Considerations are made for physical environmental factors as…

  9. Modern Lesson Plans in Environmental Science.

    ERIC Educational Resources Information Center

    Kotsonis, Helen Hoch; Baker, Bill

    This sourcebook, developed for teachers of ecology, biology, general science and hygiene, contains 27 lesson plans that have been organized into 5 units. The units are: The Dynamics of Pollution, Conservation and the Environment, Biological Controls and their Relationship to the Environment, Urban Ecology, and Environment and Health. The lesson…

  10. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    SciTech Connect

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  11. Puget Sound area electric reliability plan. Draft environmental impact statement

    SciTech Connect

    Not Available

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  12. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  13. In Brief: Environmental Protection Agency releases strategic plan

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2010-10-01

    Five grand strategic goals are the centerpiece of a strategic plan released on 30 September by the U.S. Environmental Protection Agency (EPA). The plan for fiscal years 2011-2015 outlines goals including taking action on climate change and improving air quality, protecting America's waters, cleaning up communities and advancing sustainable development, ensuring the safety of chemicals and preventing pollution, and enforcing environmental laws. “We will continue to affirm the core values of science, transparency, and the rule of law in addressing these priorities. These are the most urgent issues we must confront through 2015,” EPA administrator Lisa Jackson wrote in the plan. For more information, visit http://www.epa.gov/ocfo/plan/2015/FY2011_2015_EPA_Strategic_Plan.pdf.

  14. Assessing emergency planning zone for new nuclear power plant considering risk of extreme external events

    NASA Astrophysics Data System (ADS)

    Alzbutas, Robertas

    2015-04-01

    In general, the Emergency Planning Zones (EPZ) are defined as well as plant site and arrangement structures are designed to minimize the potential for natural and manmade hazards external to the plant from affecting the plant safety related functions, which can affect nearby population and environment. This may include consideration of extreme winds, fires, flooding, aircraft crash, seismic activity, etc. Thus the design basis for plant and site is deeply related to the effects of any postulated external events and the limitation of the plant capability to cope with accidents i.e. perform safety functions. It has been observed that the Probabilistic Safety Assessment (PSA) methodologies to deal with EPZ and extreme external events have not reached the same level of maturity as for severe internal events. The design basis for any plant and site is deeply related to the effects of any postulated external events and the limitation of the plant capability to cope with accidents i.e. perform safety functions. As a prime example of an advanced reactor and new Nuclear Power Plant (NPP) with enhanced safety, the International Reactor Innovative and Secure (IRIS) and Site selection for New NPP in Lithuania had been considered in this work. In the used Safety-by-Design™ approach, the PSA played obviously a key role; therefore a Preliminary IRIS PSA had been developed along with the design. For the design and pre-licensing process of IRIS the external events analysis included both qualitative evaluation and quantitative assessment. As a result of preliminary qualitative analyses, the external events that were chosen for more detailed quantitative scoping evaluation were high winds and tornadoes, aircraft crash, and seismic events. For the site selection in Lithuania a detail site evaluation process was performed and related to the EPZ and risk zoning considerations. In general, applying the quantitative assessment, bounding site characteristics could be used in order to

  15. Planning of External Beam Radiotherapy for Prostate Cancer Guided by PET/CT.

    PubMed

    von Eyben, Finn Edler; Kairemo, Kalevi; Kiljunen, Timo; Joensuu, Timo

    2015-01-01

    In this paper, we give an overview of articles on non-choline tracers for PET/CT for patients with prostate cancer and planning of radiotherapy guided by PET/CT. Nineteen articles described (11)C-Acetate PET/CT. Of 629 patients 483 (77%, 95% CI 74% - 80%) had positive (11)C-Acetate PET/CT scans. Five articles described (18)F-FACBC PET/CT. Of 174 patients, 127 (73%, 95% CI 68% - 78%) had positive scans. Both tracers detected local lesions, lesions in regional lymph nodes, and distant organs. Ten articles described (18)F-NaF PET/CT and found that 1289 of 3918 patients (33%) had positive reactive lesions in bones. PET/CT scan can guide external beam radiotherapy (EBRT) planning for patients with loco-regional prostate cancer. In six studies with 178 patients with localized prostate cancer, PET/CT pointed out dominant intraprostatic lesions (DIL). Oncologists gave EBRT to the whole prostate and a simultaneously integrated boost to the DIL. Four studies with 254 patients described planning of EBRT for patients with PETpositive lymph nodes. After the EBRT, 15 of 29 node-positive patients remained in remission for median 28 months (range 14 to 50 months). Most articles describe (11)C- and (18)F-Choline PET/CT. However, (11)C-Acetate and (18)F-FACBC may also be useful tracers for PET/CT. Planning of radiotherapy guided by MRI or PET/CT is an investigational method for localized prostate cancer. Current clinical controlled trials evaluate whether the method improves overall survival.

  16. Strategic environmental assessment of development plans in Great Britain

    SciTech Connect

    Therivel, R.

    1998-01-01

    Although Britain has no legislation regarding strategic environmental assessment (SEA), SEA guidance exists and various forms of SEA are carried out: environmental appraisals of development plans, environmental profiles of European Structural Fund applications, ad hoc SEAs for specific sectors, and SEAs for Cabinet decisions. These are characterized by their qualitative approach, relative brevity, and low cost. This article begins by reviewing British SEA guidelines. The status of environmental appraisal of development plans is discussed in more detail, based on a series of questionnaires of all UK local authorities that queried: the current stage of their appraisal, who carried it out, what techniques were used, and what were thought to be the costs and benefits of environmental appraisal, and advice on carrying out an appraisal. The article concludes with a brief discussion of the benefits and limitations of Britain`s streamlined form of SEA.

  17. EG and G Idaho Environmental Protection Implementation Plan (1990)

    SciTech Connect

    Wickham, L.E.

    1990-11-01

    This report describes the EG G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy--Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  18. Environmental Monitoring Plan: Environmental Monitoring Section. Appendix A, Procedures

    SciTech Connect

    1995-02-01

    This document presents information about the environmental monitoring program at Lawrence Livermore National Laboratory. Topics discussed include: air sampling; air tritium calibrations; storm water discharge; non-storm water discharge; sampling locations; ground water sampling; noise and blast forecasting; analytical laboratory auditing; document retention; procedure writing; quality assurance programs for sampling; soil and sediment sampling; sewage sampling; diversion facility tank sampling; vegetation and foodstuff sampling; and radiological dose assessments.

  19. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    SciTech Connect

    Not Available

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  20. Environmental development plan for transportation programs: FY80 update

    SciTech Connect

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  1. Environmental concerns drive project planning and design

    SciTech Connect

    Hamilton, G.M.

    1994-01-01

    This paper describes the measures used to retrofit and requalify a Northwest Pipeline Corp., pipeline near Seattle, Washington. The pipeline is a 26 inch transmission line which has lost operating pressure because of the growth in Seattle`s population. The pipeline was redesigned to requalify to a maximum pressure of 809 pounds per square inch. The paper describes the environmental issues faced during the construction and reconstruction efforts to protect wetlands and dispose of pipeline wastes. It describes the methods for cleaning the inside of the pipelines using various chemicals and cleaning tools.

  2. Environmental Release Prevention and Control Plan

    SciTech Connect

    Mamatey, A.; Arnett, M.

    1997-10-01

    During the history of SRS, continual improvements in facilities, process, and operations, and changes in the site`s mission have reduced the amount of radioactive liquid releases. In the early years of SRS (1958 to 1965), the amount of tritium discharged to the Savannah River averaged approximately 61,000 curies a year. During the mid-1980`s (1983 to 1988), liquid releases of tritium averaged 27,000 curies a year. By 1996, liquid releases of tritium are projected to be just 3000 curies for the year. This large projected decrease is the result of the planned shut-down of all reactors and the anticipated significant decline in the amount of tritium migrating from the site seepage basins and the Solid Waste Disposal Facility.

  3. Compendium of selected references on air emissions; health, risk, and valuation research; and environmental externalities

    SciTech Connect

    Szpunar, C.B.

    1992-07-01

    In preparing to develop a cost-benefit methodology that could be applied to potential projects abroad involving new coal-fired power plants that make use of US clean coal technologies, the author reviewed a wide variety of reference sources. These are listed in this publication. Before this review, the author had conducted a number of literature searches that identified source material in the newly rediscovered field of environmental externalities and related topics that might also be of value to other energy and environmental researchers. Those sources that appeared to be appropriate but that the author was unable to review are also listed in this document. Thus, this document serves as a comprehensive compendium of source material on these subjects, arranged alphabetically within categories.

  4. SU-E-T-578: MCEBRT, A Monte Carlo Code for External Beam Treatment Plan Verifications

    SciTech Connect

    Chibani, O; Ma, C; Eldib, A

    2014-06-01

    Purpose: Present a new Monte Carlo code (MCEBRT) for patient-specific dose calculations in external beam radiotherapy. The code MLC model is benchmarked and real patient plans are re-calculated using MCEBRT and compared with commercial TPS. Methods: MCEBRT is based on the GEPTS system (Med. Phys. 29 (2002) 835–846). Phase space data generated for Varian linac photon beams (6 – 15 MV) are used as source term. MCEBRT uses a realistic MLC model (tongue and groove, rounded ends). Patient CT and DICOM RT files are used to generate a 3D patient phantom and simulate the treatment configuration (gantry, collimator and couch angles; jaw positions; MLC sequences; MUs). MCEBRT dose distributions and DVHs are compared with those from TPS in absolute way (Gy). Results: Calculations based on the developed MLC model closely matches transmission measurements (pin-point ionization chamber at selected positions and film for lateral dose profile). See Fig.1. Dose calculations for two clinical cases (whole brain irradiation with opposed beams and lung case with eight fields) are carried out and outcomes are compared with the Eclipse AAA algorithm. Good agreement is observed for the brain case (Figs 2-3) except at the surface where MCEBRT dose can be higher by 20%. This is due to better modeling of electron contamination by MCEBRT. For the lung case an overall good agreement (91% gamma index passing rate with 3%/3mm DTA criterion) is observed (Fig.4) but dose in lung can be over-estimated by up to 10% by AAA (Fig.5). CTV and PTV DVHs from TPS and MCEBRT are nevertheless close (Fig.6). Conclusion: A new Monte Carlo code is developed for plan verification. Contrary to phantombased QA measurements, MCEBRT simulate the exact patient geometry and tissue composition. MCEBRT can be used as extra verification layer for plans where surface dose and tissue heterogeneity are an issue.

  5. A consolidated environmental monitoring plan for Aberdeen Proving Ground, Maryland

    SciTech Connect

    Ebinger, M.H.; Hansen, W.R.

    1997-04-01

    The US Army operates facilities in Edgewood and Aberdeen under several licenses from the Nuclear Regulatory Commission (NRC). Compliance with each license is time consuming and could potentially result in duplicated efforts to demonstrate compliance with existing environmental regulations. The goal of the ERM plan is to provide the sampling necessary to ensure that operations at Edgewood and Aberdeen are within applicable regulatory guidelines and to provide a means of ensuring that adverse effects to the environment are minimized. Existing sampling plans and environmental data generated from those plans are briefly reviewed as part of the development of the present ERM plan. The new ERM plan was designed to provide data that can be used for assessing risks to the environment and to humans using Aberdeen and Edgewood areas. Existing sampling is modified and new sampling is proposed based on the results of the long-term DU fate study. In that study, different environmental pathways were identified that would show transport of DU at Aberdeen. Those pathways would also be impacted by other radioactive constituents from Aberdeen and Edgewood areas. The ERM plan presented in this document includes sampling from Edgewood and Aberdeen facilities. The main radioactive constituents of concern at Edgewood are C, P, N, S, H, I, Co, Cs, Ca, Sr and U that are used in radiolabeling different compounds and tracers for different reactions and syntheses. Air and water sampling are the thrust of efforts at the Edgewood area.

  6. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    SciTech Connect

    Thompson, Sharon D.

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  7. Planning for the Future of the Orange County Public Schools: A Case Study in Strategic Planning and External Analysis.

    ERIC Educational Resources Information Center

    Jackson, Cole; And Others

    The Orange County Public Schools' (OCPS) external analysis model gathered and analyzed information from external sources to determine the impact of external events, trends, and issues on the schools for years to come. The OCPS model analyzed population growth, political decision making, the decline of federal funding assistance, change in the…

  8. TWRS phase I privatization site environmental baseline and characterization plan

    SciTech Connect

    Shade, J.W.

    1997-09-01

    This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan.

  9. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning... known or suspected environmental contamination. (5) (6) Policy—planning—management—capacity...

  10. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities....

  11. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities....

  12. Department of Energy’s ARM Climate Research Facility External Data Center Operations Plan Located At Brookhaven National Laboratory

    SciTech Connect

    Cialella, A.; Gregory, L.; Lazar, K.; Liang, M.; Ma, L.; Tilp, A.; Wagener, R.

    2015-05-01

    The External Data Center (XDC) Operations Plan describes the activities performed to manage the XDC, located at Brookhaven National Laboratory (BNL), for the Department of Energy’s Atmospheric Radiation Measurement (ARM) Climate Research Facility. It includes all ARM infrastructure activities performed by the Data Management and Software Engineering Group (DMSE) at BNL. This plan establishes a baseline of expectation within the ARM Operations Management for the group managing the XDC.

  13. Predicting People's Environmental Behaviour: Theory of Planned Behaviour and Model of Responsible Environmental Behaviour

    ERIC Educational Resources Information Center

    Chao, Yu-Long

    2012-01-01

    Using different measures of self-reported and other-reported environmental behaviour (EB), two important theoretical models explaining EB--Hines, Hungerford and Tomera's model of responsible environmental behaviour (REB) and Ajzen's theory of planned behaviour (TPB)--were compared regarding the fit between model and data, predictive ability,…

  14. Y-12 Site environmental protection program implementation plan (EPPIP)

    SciTech Connect

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  15. Planning Environmental Communication and Education: Lessons from Asia.

    ERIC Educational Resources Information Center

    Saeed, Seema, Ed.; Goldstein, Wendy, Ed.; Shrestha, Ram, Ed.

    This book presents the activities of the Asian Ministries for the Environment and government ministries relations with non-government organizations concerning planning environmental communication and education. This publication provides information on policies and strategies from a workshop organized by IUCN, UNEP, and UNESCO in Bangkok in July,…

  16. Environmentally Sound Small-Scale Agricultural Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Mohonk Trust, New Paltz, NY.

    This publication is the first of a series of manuals that present environmental guidelines for planning and implementing ecologically sustainable projects. Attention is particularly directed to the agricultural situation and needs of developing nations. Subject areas discussed include: (1) users and uses (identifying the major purposes of the…

  17. Environmentally Sound Small-Scale Water Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Tillman, Gus

    This manual is the second volume in a series of publications on community development programs. Guidelines are suggested for small-scale water projects that would benefit segments of the world's urban or rural poor. Strategies in project planning, implementation and evaluation are presented that emphasize environmental conservation and promote…

  18. Environmental Development cum Forest Plantation Planning and Management.

    ERIC Educational Resources Information Center

    Katoch, C. D.

    This textbook covers environmental conservation through forest plantation planning and management for all levels of forestry professionals and non-professionals in India and abroad. The book is divided into six parts and 29 sections in sequential order. Part I contains details on site selection, site preparations, site clearance, layout, and…

  19. President Jiang Zemin on family planning and environmental protection.

    PubMed

    Jiang, Z

    1998-06-01

    This article is an excerpt of a speech delivered by the Party General-Secretary and President of China, Jiang Zemin, on March 15, 1998. The occasion was the National Forum on Family Planning and Environmental Protection. It is stated that the link between family planning (FP) and environmental protection is related to sustainable social and economic development and future survival. Basic FP and environmental policies are national policies that must be carried out effectively and resolutely. New progress has been made in cleaning up pollution, especially in the Huaihe River. Effort is needed to effectively curb population growth in poor, rural areas and to reduce environmental pollution and ecological disruption. The Political Bureau of the Central Committee of the Chinese Communist Party has endorsed the goals of the FP program by 2000 and 2050. FP will be improved in poor areas, among the floating population, and according to the Three Stresses. The population policy aims to improve the quality of life. Emphasis should be placed on poverty stricken rural areas and those with ethnic minorities. Forceful measures to protect the environment are needed. Short term economic development should not compromise the environment. Environmental priorities should focus on the immediate problems that are a risk to public health. By the year 2000, all provinces should meet the standards for controlling industrial pollutants. Environmental deterioration must stop within the next 15 years. Restructuring of government and organizational reform should be conducive to FP and environmental protection.

  20. ORNL long-range environmental and waste management plan

    SciTech Connect

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  1. Environmental assessment of spatial plan policies through land use scenarios

    SciTech Connect

    Geneletti, Davide

    2012-01-15

    This paper presents a method based on scenario analysis to compare the environmental effects of different spatial plan policies in a range of possible futures. The study aimed at contributing to overcome two limitations encountered in Strategic Environmental Assessment (SEA) for spatial planning: poor exploration of how the future might unfold, and poor consideration of alternative plan policies. Scenarios were developed through what-if functions and spatial modeling in a Geographical Information System (GIS), and consisted in maps that represent future land uses under different assumptions on key driving forces. The use of land use scenarios provided a representation of how the different policies will look like on the ground. This allowed gaining a better understanding of the policies' implications on the environment, which could be measured through a set of indicators. The research undertook a case-study approach by developing and assessing land use scenarios for the future growth of Caia, a strategically-located and fast-developing town in rural Mozambique. The effects of alternative spatial plan policies were assessed against a set of environmental performance indicators, including deforestation, loss of agricultural land, encroachment of flood-prone areas and wetlands and access to water sources. In this way, critical environmental effects related to the implementation of each policy were identified and discussed, suggesting possible strategies to address them. - Graphical abstract: Display Omitted Research Highlights: Black-Right-Pointing-Pointer The method contributes to two critical issues in SEA: exploration of the future and consideration of alternatives. Black-Right-Pointing-Pointer Future scenarios are used to test the environmental performance of different spatial plan policies in uncertainty conditions. Black-Right-Pointing-Pointer Spatially-explicit land use scenarios provide a representation of how different policies will look like on the ground.

  2. Master Environmental Plan: Fort Wingate Depot Activity, Gallup, New Mexico

    SciTech Connect

    Biang, C.A.; Yuen, C.R.; Biang, R.P.; Antonopoulos, A.A.; Ditmars, J.D.

    1990-12-01

    The master environmental plan is based on an environmental assessment of the areas requiring environmental evaluation (AREEs) at Fort Wingate Depot Activity near Gallup, New Mexico. The Fort Wingate Depot Activity is slated for closure under the Base Closure and Realignment Act, Public Law 100--526. The MEP assesses the current status, describes additional data requirements, recommends actions for the sites, and establishes a priority order for actions. The plan was developed so that actions comply with hazardous waste and water quality regulations of the State of New Mexico and applicable federal regulations. It contains a brief history of the site, relevant geological and hydrological information, and a description of the current status for each AREE along with a discussion of the available site-specific data that pertain to existing or potential contamination and the impact on the environment. 35 refs., 27 figs., 23 tabs.

  3. Planning for environmental constraints on the PJM system

    SciTech Connect

    Not Available

    1994-07-15

    This chapter provides a snapshot of the existing PJM system and identifies the environmental constraints that form the parameters for the regional approaches analyzed in this study. The chapter begins with a description of the PJM system and the costs and emissions levels of the pollutants under study associated with the reference case (the PJM system configured to meet only Clean Air Act Amendment Phase I SO{sub 2} requirements and the March 1994 NO{sub x} requirements affecting Phase I units){sup 3}. Next, the pollution-reduction scenario assumed for the purpose of the study, which covers the period 1995--2010, is described. Finally, the impacts of this pollution reduction scenario -- emissions that would need to be avoided on the reference case PJM system -- are identified. Modeling methods are described alongside the study`s results. Other chapters discuss: environmental constraints, alternate plans to achieve environmental goals, and comparison of alternate plans.

  4. Tracking Dissipation Reduction, Externalities, Stability and Sustainability for Environmental Management of New Orleans

    NASA Astrophysics Data System (ADS)

    McNamara, D.; Werner, B. T.

    2014-12-01

    Sustainability requires stability, but in promoting economic development, modern economies and political systems reduce stabilizing dissipation by facilitating use and management of the environment through engineered mitigation of disturbances, which externalizes dissipation over the short to medium term. To quantitatively investigate the relationship between a range of environmental management approaches and sustainability, and the implications for Earth's future, we track the impact of management strategies on dissipation within the system and its externalities in a numerical model for the coupled economic, political/management and flooding dynamics of New Orleans. The model simulates river floods, hurricane storm-surge-induced floods, subsidence, and agent-based market interactions leading to development of port services, hotels, homes and labor relations. Flood protection decisions for levee construction based on the baseline case of cost-benefit analyses designed to prevent short-term economic loss from future floods qualitatively reproduce historical expansion of New Orleans and increases in levee height. Alternative management strategies explored include majority voting, consensus-based decision-making, and variations in discounting of costs and benefits. Enhanced dissipation is measured relative to optimal economic development without floods. The focus of modern economies on commodification is exploited to track dissipation as a scalar representing value or power, but this approach might not be applicable to more complicated traditional/indigenous cultures or cultures of resistance. For the baseline case, short-to-medium-term reductions in dissipation destabilize the coupled system, resulting in episodic bursts of externalized dissipation during flooding. Comparisons of results for a range of management options and generalizations of this approach for alternative cultural systems will be discussed.

  5. [Environmental somatization syndrome. How to deal with the external milieu syndrome?].

    PubMed

    Nilsson, C G; Göthe, C J; Molin, C

    1994-01-01

    Somatization is a tendency to experience and communicate psychogenic distress in the form of somatic symptoms and to seek medical help for them. Patients suffering from environmental somatization syndrome (ESS) consider their symptoms to be caused by exposure to chemical or physical components of the external environment or by ergonomic stress at work. ESS is distinguished by mental contagiousness and a tendency to cluster. Sometimes it explodes in wide-spread epidemics that may be escalated by mass-media campaigns. Extensive ESS epidemics have been connected to, i.a., arsenic, carbon monoxide ("generator gas poisoning"), mercury ("oral galvanism"), carbon-free copy papers, electromagnetic fields ("electric allergy") and repetitive movements ("repetition strain injury", RSI). The typical patient directs the interest on the external environment, refuses alternative explanations of his symptoms and abhors any suggestion of a psychogenic etiology. The community is often placed in difficult positions by lobby groups calling for drastic measures to eliminate alleged disease-inducing exposures. When hygienic evils occur simultaneously with an ESS epidemic, it is essential to strictly differ the hygienic problems from the ESS problems. If mismanaged, measures aimed at reducing hygienic inconveniences may aggravate the complex of ESS problems.

  6. Strategic plan for Hanford Site Environmental Restoration Information Management

    SciTech Connect

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  7. Hanford Site waste management and environmental restoration integration plan

    SciTech Connect

    Merrick, D.L.

    1990-04-30

    The Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs.

  8. BNL ENVIRONMENTAL MONITORING PLAN TRIENNIAL UPDATE, JANUARY 2003.

    SciTech Connect

    BROOKHAVEN NATIONAL LABORATORY

    2003-01-01

    Brookhaven National Laboratory (BNL) is a multi-program national laboratory operated by Brookhaven Science Associates for the U.S. Department of Energy (DOE) and is located on a 5,265-acre site in Suffolk County, Long Island, New York. BNL has a comprehensive Environmental Management System (EMS) in place, which meets the requirements of the International Organization for Standardization 14001 EMS Standard, as described in the BNL EMS Manual. BNL's extensive environmental monitoring program is one component of the EMS, and the BNL Environmental Monitoring Plan (EMP) describes this program in detail. The data derived from systematically monitoring the various environmental media on site enable BNL to make informed decisions concerning the protection of human health and the environment and to be responsive to community concerns.

  9. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... cost of such activities under §§ 1003.201 through 1003.204. (b)...

  10. Utility planning using least-cost principles and the role of externalities - staff report on a Keystone policy dialogue

    SciTech Connect

    1996-05-01

    For over two years, The Keystone Center facilitated a two-phase dialogue on Utility Planning Using Least-Cost Principles and, in the second phase, on the role of Externalities. The intent of this report is to assist policy-makers faced with decisions about changes to traditional utility regulation and planning. This report is not a consensus document, rather it is staff written summary of two years of discussion on the issues. As a concept, least-cost planning has been discussed since the 1970`s and many states have implemented such programs since the mid-1980`s. Yet, the actual goals and objectives of least-cost planning remain a source of controversy between affected interest groups. Some industry observers believe that least-cost planning can help reconcile the often conflicting demands between increased capacity requirements and concerns about the external costs of power production. In traditional utility regulation practices, capital investments are rewarded and revenue is a direct function of sales. However, a number state public utility commissions have altered their practices to allow for returns on investments in more efficient end-use equipment (also known as ratebasing conservation) and adjusting revenues to account for sales lost due to utility conservation programs. Other states are planning these types of changes. Still others are observing the impacts of the changes before they commit.

  11. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  12. Advanced Coal Conversion Process Demonstration Project. Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1992-04-01

    Western Energy Company (WECO) was selected by the Department of Energy (DOE) to demonstrate the Advanced Coal Conversion Process (ACCP) which upgrades low rank coals into high Btu, low sulfur, synthetic bituminous coal. As specified in the Corporate Agreement, RSCP is required to develop an Environmental Monitoring Plan (EMP) which describes in detail the environmental monitoring activities to be performed during the project execution. The purpose of the EMP is to: (1) identify monitoring activities that will be undertaken to show compliance to applicable regulations, (2) confirm the specific environmental impacts predicted in the National Environmental Policy Act documentation, and (3) establish an information base of the assessment of the environmental performance of the technology demonstrated by the project. The EMP specifies the streams to be monitored (e.g. gaseous, aqueous, and solid waste), the parameters to be measured (e.g. temperature, pressure, flow rate), and the species to be analyzed (e.g. sulfur compounds, nitrogen compounds, trace elements) as well as human health and safety exposure levels. The operation and frequency of the monitoring activities is specified, as well as the timing for the monitoring activities related to project phase (e.g. preconstruction, construction, commissioning, operational, post-operational). The EMP is designed to assess the environmental impacts and the environmental improvements resulting from construction and operation of the project.

  13. Environmental monitoring plan for the Oak Ridge Reservation

    SciTech Connect

    Not Available

    1992-09-01

    The Environmental Monitoring Plan (EMP) for the Oak Ridge Reservation (ORR) is an omnibus document providing a single point of reference for the effluent monitoring and environmental surveillance programs of Oak Ridge National Laboratory (ORNL), Y-12 Plant, K-25 Site, and ORR areas outside specific facility boundaries. Authorization and requirement for the EMP are contained in Department of Energy (DOE) Order 5400.1 Chapter 4, which states that environmental monitoring consists of two major activities: effluent monitoring and environmental surveillance. This EMP is intended to document the rationale and design criteria for the effluent monitoring and environmental surveillance programs, extent and frequency of sampling and analysis, analytical laboratory procedures, quality assurance, implementation, and reporting. The EMP describes one of several programs that collect and analyze data to assess the impacts of ORR on the environment and human health. Others include the Environmental Restoration Program and the Clinch River Remedial Investigation Program. While the ultimate goal for DOE may be to integrate information from all these programs into a formalized assessment of risk to ecosystems and human health, that level of integration is beyond the scope of the EMP. The EMP outlines the goals of environmental monitoring for the ORR and its facilities and includes activities that are not presently conducted. In general, the programs described in this EMP represent an increase in surveillance activities over past practices.

  14. HEDR model validation plan. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Napier, B.A.; Gilbert, R.O.; Simpson, J.C.; Ramsdell, J.V. Jr.; Thiede, M.E.; Walters, W.H.

    1993-06-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project has developed a set of computational ``tools`` for estimating the possible radiation dose that individuals may have received from past Hanford Site operations. This document describes the planned activities to ``validate`` these tools. In the sense of the HEDR Project, ``validation`` is a process carried out by comparing computational model predictions with field observations and experimental measurements that are independent of those used to develop the model.

  15. PyCMSXiO: an external interface to script treatment plans for the Elekta® CMS XiO treatment planning system

    NASA Astrophysics Data System (ADS)

    Xing, Aitang; Arumugam, Sankar; Holloway, Lois; Goozee, Gary

    2014-03-01

    Scripting in radiotherapy treatment planning systems not only simplifies routine planning tasks but can also be used for clinical research. Treatment planning scripting can only be utilized in a system that has a built-in scripting interface. Among the commercially available treatment planning systems, Pinnacle (Philips) and Raystation (Raysearch Lab.) have inherent scripting functionality. CMS XiO (Elekta) is a widely used treatment planning system in radiotherapy centres around the world, but it does not have an interface that allows the user to script radiotherapy plans. In this study an external scripting interface, PyCMSXiO, was developed for XiO using the Python programming language. The interface was implemented as a python package/library using a modern object-oriented programming methodology. The package was organized as a hierarchy of different classes (objects). Each class (object) corresponds to a plan object such as the beam of a clinical radiotherapy plan. The interface of classes was implemented as object functions. Scripting in XiO using PyCMSXiO is comparable with Pinnacle scripting. This scripting package has been used in several research projects including commissioning of a beam model, independent three-dimensional dose verification for IMRT plans and a setup-uncertainty study. Ease of use and high-level functions provided in the package achieve a useful research tool. It was released as an open-source tool that may benefit the medical physics community.

  16. Environmental restoration and remediation technical data management plan

    SciTech Connect

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit.

  17. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... will evaluate different approaches for water resources management to determine the potential impacts on... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Prepare a Water Resources Management Plan/ Environmental Impact Statement for Mojave National...

  18. 78 FR 69127 - Supplemental Draft Environmental Impact Statement/General Management Plan, Biscayne National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... National Park Service Supplemental Draft Environmental Impact Statement/General Management Plan, Biscayne National Park, Florida AGENCY: National Park Service, Interior. ACTION: Notice of Availability of a Supplemental Draft Environmental Impact Statement for the General Management Plan, Biscayne National...

  19. 77 FR 38824 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... National Park Service Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park AGENCY: National Park Service, Interior. ACTION: Notice of Availability of the Draft Supplemental Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park....

  20. Implementing Strategic Environmental Assessment of spatial planning tools

    SciTech Connect

    De Montis, Andrea

    2013-07-15

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage.

  1. 76 FR 23335 - Wilderness Stewardship Plan/Environmental Impact Statement, Sequoia and Kings Canyon National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... planning and environmental impact analysis process required to inform consideration of alternative..., and adhering to legally-mandated management and preservation requirements. This planning process... wilderness planning process. All written comments must be transmitted, postmarked, or hand-delivered no...

  2. 76 FR 50494 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Scoping Period for Water Resources Management Plan/Environmental Impact Statement for Mojave National... National Park Service is preparing a Water Resources Management Plan/Environmental Impact Statement...

  3. ENVIRONMENTAL PLANNING FOR SMALL COMMUNITIES: A GUIDE FOR LOCAL DECISION-MAKERS

    EPA Science Inventory

    Environmental Planning for Small Communities - A Guide for Local Decision-Makers presents a process for creating and implementing a community environmental plan. With a comprehensive environmental plan, local decision-makers can create an integrated approach to protecting the env...

  4. 77 FR 39253 - Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan, Denali...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... NATIONAL PARK SERVICE Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan... of the Final Environmental Impact Statement for the Denali Park Road Vehicle Management Plan. SUMMARY... Denali Park Road Vehicle Management Plan (Plan/FEIS), for Denali National Park and Preserve, Alaska....

  5. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... National Park Service Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement... Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan, Biscayne National... Impact Statement for the Coral Reef Restoration Plan (Plan/FEIS) for Biscayne National Park, Florida....

  6. 76 FR 17471 - Air Tour Management Plan Environmental Assessment for Mount Rainier National Park, WA; Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... Director's Order 12: Conservation Planning, Environmental Impact Analysis, and Decision-making, and NPS...://www.faa.gov/about/office_org/headquarters_offices/arc/programs/air_tour_management_plan/ NPS Planning... Federal Aviation Administration Air Tour Management Plan Environmental Assessment for Mount...

  7. Biofuel production system with operation flexibility: Evaluation of economic and environmental performance under external disturbance

    NASA Astrophysics Data System (ADS)

    Kou, Nannan

    Biomass derived liquid hydrocarbon fuel (biofuel) has been accepted as an effective way to mitigate the reliance on petroleum and reduce the greenhouse gas emissions. An increasing demand for second generation biofuels, produced from ligno-cellulosic feedstock and compatible with current infrastructure and vehicle technologies, addresses two major challenges faced by the current US transportation sector: energy security and global warming. However, biofuel production is subject to internal disturbances (feedstock supply and commodity market) and external factors (energy market). The biofuel industry has also heavily relied on government subsidy during the early development stages. In this dissertation, I investigate how to improve the economic and environmental performance of biorefineries (and biofuel plant), as well as enhance its survivability under the external disturbances. Three types of disturbance are considered: (1) energy market fluctuation, (2) subsidy policy uncertainty, and (3) extreme weather conditions. All three factors are basically volatile, dynamic, and even unpredictable, which makes them difficult to model and have been largely ignored to date. Instead, biofuel industry and biofuel research are intensively focused on improving feedstock conversion efficiency and capital cost efficiency while assuming these advancements alone will successfully generate higher profit and thus foster the biofuel industry. The collapse of the largest corn ethanol biofuel company, Verasun Energy, in 2008 calls into question this efficiency-driven approach. A detailed analysis has revealed that although the corn ethanol plants operated by Verasun adopted the more efficient (i.e. higher ethanol yield per bushel of corn and lower capital cost) dry-mill technology, they could not maintain a fair profit margin under fluctuating market condition which made ethanol production unprofitable. This is because dry-mill plant converts a single type of biomass feedstock (corn

  8. Integrated Science Assessment (ISA) for Oxides of Nitrogen and Sulfur Environmental Criteria (Second External Review Draft, Aug 2008)

    EPA Science Inventory

    EPA has announced that the Second External Review Draft of the Integrated Science Assessment (ISA) for Oxides of Nitrogen and Sulfur - Environmental Criteria has been made available for independent peer review and public review. This draft ISA document represents a conci...

  9. Integrated Science Assessment (ISA) for Oxides of Nitrogen and Sulfur Environmental Criteria (First External Review Draft, Dec 2007)

    EPA Science Inventory

    EPA is announcing that the First External Review Draft of the Integrated Science Assessment (ISA) for Oxides of Nitrogen and Sulfur – Environmental Criteria has been made available for independent peer review and public review. This draft ISA document represents a concise ...

  10. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    PubMed

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  11. Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program

    SciTech Connect

    Not Available

    1993-07-01

    The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

  12. Engineering Strategies and Methods for Avoiding Air-Quality Externalities: Dispersion Modeling, Home Energy Conservation, and Scenario Planning

    NASA Astrophysics Data System (ADS)

    Knox, Andrew James

    Energy conservation can improve air quality by reducing emissions from fuel combustion. The human health value retained through better air quality can then offset the cost of energy conservation. Through this thesis' innovative yet widely-accessible combination of air pollution dispersion modeling and atmospheric chemistry, it is estimated that the health value retained by avoiding emissions from Ontario's former coal-fired generating stations is 5.74/MWh (using an upper-bound value of 265,000 per year of life lost). This value is combined with energy modeling of homes in the first-ever assessment of the air-quality health benefits of low-energy buildings. It is shown that avoided health damages can equal 7% of additional construction costs of energy efficient buildings in Ontario. At 7%, health savings are a significant item in the cost analysis of efficient buildings. Looking to energy efficiency in the context of likely future low-resource natural gas scenarios, building efficient buildings today is shown to be more economically efficient than any building retrofit option. Considering future natural gas scarcity in the context of Ontario's Long-Term Energy Plan reveals that Ontario may be forced to return to coal-fired electricity. Projected coal use would result in externalities greater than $600 million/year; 80% more than air-quality externalities from Ontario's electricity in 1985. Radically aggressive investment in electricity conservation (75% reduction per capita by 2075) is one promising path forward that keeps air-quality externalities below 1985 levels. Non-health externalities are an additional concern, the quantification, and ultimately monetization, of which could be practical using emerging air pollution monitoring technologies. Energy, conservation, energy planning, and energy's externalities form a complex situation in which today's decisions are critical to a successful future. It is clear that reducing the demand for energy is essential and

  13. 78 FR 26067 - General Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... National Park Service General Management Plan, Draft Environmental Impact Statement, Big Thicket National... announces the availability of a Draft Environmental Impact Statement for the General Management Plan, Big... Environmental Impact Statement from the public for 60 days after the date the Environmental Protection...

  14. Specialized Environmental Chamber Test Complex: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Montz, Michael E.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Specialized Environmental Test Complex. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  15. Work plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Not Available

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  16. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM: QUALITY AND MANAGEMENT PLAN FOR THE PILOT PERIOD (1995-2000)

    EPA Science Inventory

    Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...

  17. Environmental Quality Information Analysis Center multi-year plan

    SciTech Connect

    Rivera, R.G. ); Das, S. ); Walsh, T.E. )

    1992-09-01

    An information analysis center (IAC) is a federal resource that provides technical information for a specific technology field. An IAC links an expert technical staff with an experienced information specialist group, supported by in-house or external data bases to provide technical information and maintain a corporate knowledge in a technical area. An IAC promotes the rapid transfer of technology among its users and provides assistance in adopting new technology and predicting and assessing emerging technology. This document outlines the concept, requirements, and proposed development of an Environmental Quality IAC (EQIAC). An EQIAC network is composed of several nodes, each of which has specific technology capabilities. This document outlines strategic and operational objectives for the phased development of one such node of an EQIAC network.

  18. Environmental assessment and planning at Mound - environmental monitoring capabilities and personnel profiles

    SciTech Connect

    1996-07-01

    Through its long experience with radioactive materials, Mound has developed a comprehensive, routine, offsite, environmental surveillance program to safeguard its employees, the physical plant, and the integrity of the surrounding environment from any potential adverse effects of its widely diverse operations. Effluent samples are analyzed for radiological and non-radiological parameters. The environment surrounding Mound Facility is continuously monitored - air, water, foodstuffs, vegetation, soil, and silt samples are analyzed to ensure that radioisotopic concentrations and other possible pollutants are well within the stringent standards adopted by the Department of Energy, the Environmental Protection Agencies (both federal and state), and various regional and local agencies. Moreover, this environmental surveillance program has been designed to ensure that the facility is designed, constructed, managed, operated, and maintained in a manner that continues to meet all federal, state, and local standards for environmental protection. Work in environmental science has been broadened to assess environmental factors associated with various aspects of the National Energy Plan. Both the management and staff at Mound have undertaken a firm commitment to make Mound`s environmental monitoring capabilities available to agencies that have the responsibility for the resolution of important environmental issues.

  19. Advancing environmental toxicology through chemical dosimetry: External exposures versus tissue residues

    USGS Publications Warehouse

    McCarty, L.S.; Landrum, P.F.; Luoma, S.N.; Meador, J.P.; Merten, A.A.; Shephard, B.K.; van Wezelzz, A.P.

    2011-01-01

    The tissue residue dose concept has been used, although in a limited manner, in environmental toxicology for more than 100 y. This review outlines the history of this approach and the technical background for organic chemicals and metals. Although the toxicity of both can be explained in tissue residue terms, the relationship between external exposure concentration, body and/or tissues dose surrogates, and the effective internal dose at the sites of toxic action tends to be more complex for metals. Various issues and current limitations related to research and regulatory applications are also examined. It is clear that the tissue residue approach (TRA) should be an integral component in future efforts to enhance the generation, understanding, and utility of toxicity testing data, both in the laboratory and in the field. To accomplish these goals, several key areas need to be addressed: 1) development of a risk-based interpretive framework linking toxicology and ecology at multiple levels of biological organization and incorporating organism-based dose metrics; 2) a broadly applicable, generally accepted classification scheme for modes/mechanisms of toxic action with explicit consideration of residue information to improve both single chemical and mixture toxicity data interpretation and regulatory risk assessment; 3) toxicity testing protocols updated to ensure collection of adequate residue information, along with toxicokinetics and toxicodynamics information, based on explicitly defined toxicological models accompanied by toxicological model validation; 4) continued development of residueeffect databases is needed ensure their ongoing utility; and 5) regulatory guidance incorporating residue-based testing and interpretation approaches, essential in various jurisdictions. ??:2010 SETAC.

  20. Negative Affect Shares Genetic and Environmental Influences with Symptoms of Childhood Internalizing and Externalizing Disorders

    ERIC Educational Resources Information Center

    Mikolajewski, Amy J.; Allan, Nicholas P.; Hart, Sara A.; Lonigan, Christopher J.; Taylor, Jeanette

    2013-01-01

    The co-occurrence of internalizing and externalizing disorders suggests that they may have common underlying vulnerability factors. Research has shown that negative affect is moderately positively correlated with both internalizing and externalizing disorders in children. The present study is the first to provide an examination of negative affect…

  1. Advanced Environmental Monitoring and Control Program: Strategic Plan

    NASA Technical Reports Server (NTRS)

    Schmidt, Gregory

    1996-01-01

    Human missions in space, from short-duration shuttle missions lasting no more than several days to the medium-to-long-duration missions planned for the International Space Station, face a number of hazards that must be understood and mitigated for the mission to be carried out safely. Among these hazards are those posed by the internal environment of the spacecraft itself; through outgassing of toxic vapors from plastics and other items, failures or off-nominal operations of spacecraft environmental control systems, accidental exposure to hazardous compounds used in experiments: all present potential hazards that while small, may accumulate and pose a danger to crew health. The first step toward mitigating the dangers of these hazards is understanding the internal environment of the spacecraft and the compounds contained within it. Future spacecraft will have integrated networks of redundant sensors which will not only inform the crew of hazards, but will pinpoint the problem location and, through analysis by intelligent systems, recommend and even implement a course of action to stop the problem. This strategic plan details strategies to determine NASA's requirements for environmental monitoring and control systems for future spacecraft, and goals and objectives for a program to answer these needs.

  2. External Quality Assurance in Higher Education: Making Choices. Fundamentals of Educational Planning 85

    ERIC Educational Resources Information Center

    Martin, Michaela; Stella, Antony

    2007-01-01

    This booklet aims to provide policy advice and support to decision-makers and managers in the area of quality assurance in higher education. In order to do so, the authors describe and discuss major issues that decision-makers in charge of quality assurance need to consider for the creation or development of an external quality assurance (EQA)…

  3. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Eligible planning, urban... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT..., urban environmental design and policy-planning-management-capacity building activities. (a)...

  4. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Eligible planning, urban... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT..., urban environmental design and policy-planning-management-capacity building activities. (a)...

  5. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Eligible planning, urban... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT..., urban environmental design and policy-planning-management-capacity building activities. (a)...

  6. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Eligible planning, urban... planning, urban environmental design and policy-planning-management-capacity building activities. (a.... Also, costs necessary to comply with the requirements of 24 CFR part 58, including project...

  7. Motion planning for robotic spray cleaning with environmentally safe solvents

    SciTech Connect

    Hwang, Yong K.; Meirans, L.; Drotning, W.D.

    1993-09-01

    Automatic motion planning of a spray cleaning robot with collision avoidance is presented in this paper. In manufacturing environments, electronic and mechanical components are traditionally cleaned by spraying or dipping them using chlorofluorocarbon (CFC) solvents. As new scientific data show that such solvents are major causes for stratospheric ozone depletion, an alternate cleaning method is needed. Part cleaning with aqueous solvents is environmentally safe, but can require precision spraying at high pressures for extended time periods. Operator fatigue during manual spraying can decrease the quality of the cleaning process. By spraying with a robotic manipulator, the necessary spray accuracy and consistency to manufacture highreliability components can be obtained. Our motion planner was developed to automatically generate motions for spraying robots based on the part geometry and cleaning process parameters. For spraying paint and other coatings a geometric description of the parts and robot may be sufficient for motion planning, since coatings are usually done over the visible surfaces. For spray cleaning, the requirement to reach hidden surfaces necessitates the addition of a rule-based method to the geometric motion planning.

  8. Integration of landslide susceptibility products in the environmental plans

    NASA Astrophysics Data System (ADS)

    Fiorucci, Federica; Reichenbach, Paola; Rossi, Mauro; Cardinali, Mauro; Guzzetti, Fausto

    2015-04-01

    Landslides are one of the most destructive natural hazard that causes damages to urban area worldwide. The knowledge of where a landslide could occur is essential for the strategic management of the territory and for a good urban planning . In this contest landslide susceptibility zoning (LSZ) is crucial to provide information on the degree to which an area can be affected by future slope movements. Despite landslide susceptibility maps have been prepared extensively during the last decades, there are few examples of application is in the environmental plans (EP). In this work we present a proposal for the integration of the landslide inventory map with the following landslide susceptibility products: (i) landslide susceptibility zonation , (ii) the associated error map and (iii) the susceptibility uncertainty map. Moreover we proposed to incorporate detailed morphological studies for the evaluation of landslide risk associated to local parceling plan. The integration of all this information is crucial for the management of landslide risk in urban expansions forecasts. Municipality, province and regional administration are often not able to support the costs of landslide risk evaluation for extensive areas but should concentrate their financial resources to specific hazardous and unsafe situations defined by the result of the integration of landslide susceptibility products. Zonation and detail morphological analysis should be performed taking into account the existing laws and regulations, and could become a starting point to discuss new regulations for the landslide risk management.

  9. Developing a collaborative model for environmental planning and management

    NASA Astrophysics Data System (ADS)

    Selin, Steve; Chevez, Deborah

    1995-03-01

    Methods for involving the public in natural resource management are changing as agencies adjust to an increasingly turbulent social and political environment. There is growing interest among managers and scholars in collaborative approaches to public involvement. Collaboration is conceptually defined and elaborated using examples from the natural resource management field. This paper then examines how collaboration theory from the organizational behavior field can help environmental managers to better understand those factors that facilitate and inhibit collaborative solutions to resource problems. A process-oriented model is presented that proposes that collaboration emerges out of an environmental context and then proceeds sequentially through a problem-setting, direction-setting, and structuring phase. Factors constraining collaboration are also specified, including organizational culture and power differentials. Designs for managing collaboration are identified, which include appreciative planning, joint agreements, dialogues, and negotiated settlements. Environmental managers need new skills to manage collaboration within a dynamic social and political environment. Further research is needed to test the propositions outlined here.

  10. 75 FR 63851 - Draft General Management Plan and Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... planning and management. DATES: The National Park Service will accept comments on the Draft GMP/ EIS from... National Park Service Draft General Management Plan and Environmental Impact Statement, Hampton National... Availability of the Draft General Management Plan and Environmental Impact Statement for Hampton...

  11. 76 FR 35467 - Deer and Vegetation Management Plan/Environmental Impact Statement, Fire Island National Seashore...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ... National Park Service Deer and Vegetation Management Plan/Environmental Impact Statement, Fire Island... Intent to prepare an Environmental Impact Statement for a Deer and Vegetation Management Plan, Fire...) for a Deer and Vegetation Management Plan at Fire Island National Seashore, New York. The purpose...

  12. Environmental Education in Graduate Professional Degrees: The Case of Urban Planning

    ERIC Educational Resources Information Center

    White, Stacey Swearingen; Mayo, James M.

    2005-01-01

    Environmental education (EE) is a prominent aspect of graduate-level master's programs in urban and regional planning. This article draws on the results of a survey of 66 environmental planning educators in urban and regional planning programs to show what types of EE are most prevalent in these graduate professional programs and in planning…

  13. 76 FR 68503 - Ungulate Management Plan/Environmental Impact Statement, Great Sand Dunes National Park and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... National Park Service Ungulate Management Plan/Environmental Impact Statement, Great Sand Dunes National... Intent to prepare an Environmental Impact Statement for the Ungulate Management Plan, Great Sand Dunes... Ungulate Management Plan, Great Sand Dunes National Park and Preserve, Colorado. The purpose of this...

  14. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... National Park Service Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation... Impact Statement for the Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: Pursuant to...) is releasing a Draft Environmental Impact Statement for the Dog Management Plan (Draft...

  15. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... National Park Service Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National... comment period for Draft Environmental Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan...

  16. 76 FR 41516 - Vegetation and Deer Management Plan/Environmental Impact Statement, Morristown National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ... National Park Service Vegetation and Deer Management Plan/Environmental Impact Statement, Morristown...: Notice of Intent to prepare an Environmental Impact Statement for a Vegetation and Deer Management Plan... Statement (EIS) for a Vegetation and Deer Management Plan at Morristown National Historical Park (NHP),...

  17. Disentangling genetic, environmental, and rater effects on internalizing and externalizing problem behavior in 10-year-old twins.

    PubMed

    Bartels, Meike; Boomsma, Dorret I; Hudziak, James J; Rietveld, Marjolein J H; van Beijsterveldt, Toos C E M; van den Oord, Edwin J C G

    2004-04-01

    Previous studies have emphasized the importance of rater issues in studying the etiology of variation in internalizing and externalizing problems in children. Earlier results indicate only moderate agreement between parents, and assume that parents assess a specific aspect of their child's behavior. In comparable samples of younger children, additive genetic effects are the main factor explaining individual differences in both internalizing and externalizing behavior. It is unknown whether this pattern of rater influences and variance decomposition will be consistent in older children. Child Behavior Checklists (Achenbach, 1991), completed by both parents, were collected in a sample of 2956 Dutch 10-year-old twin pairs. The etiology of individual differences in internalizing and externalizing syndromes was examined using a model that corrected for possible rater bias, rater-specific effects and unreliability. The best fitting model suggested that disagreement between the parents is not merely the result of unreliability and/or rater bias, but each parent also provides specific information from his/her own perspective on the child's behavior. Significant influences of additive genetic, shared environmental and unique environmental factors were found for internalizing and externalizing syndromes.

  18. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    SciTech Connect

    Bechtel Nevada

    1998-12-31

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  19. Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2

    SciTech Connect

    Not Available

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

  20. Nuclear power plant license renewal environmental life cycle management plan manual: License renewal environmental compliance. Final report

    SciTech Connect

    Doroshuk, B.W.; Tucker, R.L.; Cudworth, J.A.

    1995-10-01

    This manual focuses on preparing to meet NRC environmental requirements for license renewal. It describes a nuclear power plant`s day-to-day environmental protection activities and the relationship between these activities and a plan for preparing a license renewal environmental report supplement. This report is the second phase of a three-phased approach to satisfying license renewal environmental requirements. The first phase involved programmatic planning and resulted in identifying applicable requirements, an approach to meeting the requirements, and any ``fatal flaws`` (EPRI TR-10429 1). This phase involves planning for environmental life cycle management, including project planning for a license renewal environmental report supplement (ERS). The third phase involves preparing an ERS.

  1. 76 FR 30319 - Real Property Master Plan Programmatic Environmental Impact Statement, at Yuma Proving Ground...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... Department of the Army Real Property Master Plan Programmatic Environmental Impact Statement, at Yuma Proving... the Army intends to prepare a Programmatic Environmental Impact Statement (PEIS) to analyze the environmental impacts resulting from adoption and implementation of a Real Property Master Plan...

  2. A State Plan for Environmental Education for the Citizens of Minnesota.

    ERIC Educational Resources Information Center

    Minnesota Environmental Education Council, St. Paul.

    A comprehensive plan for environmental education in Minnesota is developed in this report. Organizational recommendations are defined first, indicating the need for an organizational structure, one consisting of eight regional environmental education commissions and one state environmental education planning-coordinating council. The commissions…

  3. 77 FR 66626 - Deepwater Horizon Oil Spill; Draft Early Restoration Plan and Environmental Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Deepwater Horizon Oil Spill; Draft Early Restoration Plan and Environmental Review AGENCY: Interior. ACTION... (OPA), the National Environmental Policy Act (NEPA), and the Framework Agreement for Early Restoration... trustee agencies (Trustees) have prepared a Phase II Draft Early Restoration Plan and Environmental...

  4. Automatic MRI Atlas-Based External Beam Radiation Therapy Treatment Planning for Prostate Cancer

    NASA Astrophysics Data System (ADS)

    Dowling, Jason; Lambert, Jonathan; Parker, Joel; Greer, Peter B.; Fripp, Jurgen; Denham, James; Ourselin, Sébastien; Salvado, Olivier

    Prostate radiation therapy dose planning currently requires computed tomography (CT) scans as they contain electron density information needed for patient dose calculations. However magnetic resonance imaging (MRI) images have significantly superior soft-tissue contrast for segmenting organs of interest and determining the target volume for treatment. This paper describes work on the development of an alternative treatment workflow enabling both organ delineation and dose planning to be performed using MRI alone. This is achieved by atlas based segmentation and the generation of pseudo-CT scans from MRI. Planning and dosimetry results for three prostate cancer patients from Calvary Mater Newcastle Hospital (Australia) are presented supporting the feasibility of this workflow. Good DSC scores were found for the atlas based segmentation of the prostate (mean 0.84) and bones (mean 0.89). The agreement between MRI/pseudo-CT and CT planning was quantified by dose differences and distance to agreement in corresponding voxels. Dose differences were found to be less than 2%. Chi values indicate that the planning CT and pseudo-CT dose distributions are equivalent.

  5. Environmental issues in planning building energy technologies R D in the United States

    SciTech Connect

    Farhar, B.C. ); Abel, F.H. ); Nicholls, A.K. ); Millhone, J.P. . Office of the Deputy Assistant Secretary for Building Technologies)

    1991-08-01

    The US Department of Energy's Office of Building Technologies (OBT) has begun studies on the relationship and impact of buildings energy use on the environment, particularly with respect to global climate change, acid rain, stratospheric ozone depletion, and indoor air quality. The paper presents an overview of international and US federal activity in global change to set OBT's activities in context. The paper then reviews briefly the contribution of buildings to atmospheric problems through building energy use. OBT's program primarily supports projects with indirect environmental impacts through energy efficiency (e.g., thermally activated heat pumps use natural gas instead of electricity) and the use of renewables in buildings. The paper briefly describes the OBT program and covers an inventory of projects that OBT has funded on environmental/building problems. Analyses have included three kinds of topics: (1) CFC substitutes for refrigeration equipment, (2) incorporating the cost of externalities into utility electricity generation, and (3) indoor air quality. The paper shows how environmental issues are being taken into account in planning the US R D program in building energy technologies. 27 refs.

  6. Activity plan: Directional drilling and environmental measurements while drilling

    SciTech Connect

    Myers, D.A.

    1998-07-16

    This activity plan describes the testing of directional drilling combined with environmental measurements while drilling at two Hanford Site locations. A cold test is to be conducted at the 105A Mock Tank Leak Facility in the 200 East Area. A hot test is proposed to be run at the 216-B-8 tile field north of the 241-B Tank Farm in 200 East Area. Criteria to judge the success, partial success or failure of various aspects of the test are included. The TWRS program is assessing the potential for use of directional drilling because of an identified need to interrogate the vadose zone beneath the single-shell tanks. Because every precaution must be taken to assure that investigation activities do not violate the integrity of the tanks, control of the drill bit and ability to follow a predetermined drill path are of utmost importance and are being tested.

  7. 49 CFR 520.25 - External review of draft environmental impact statements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of an environmental statement, comments of the reviewing agencies on the environmental effects of the... media advising where the DEIS is available and how copies may be obtained. The Office of Public...

  8. Coordinated turn-and-reach movements. II. Planning in an external frame of reference

    NASA Technical Reports Server (NTRS)

    Pigeon, Pascale; Bortolami, Simone B.; DiZio, Paul; Lackner, James R.

    2003-01-01

    The preceding study demonstrated that normal subjects compensate for the additional interaction torques generated when a reaching movement is made during voluntary trunk rotation. The present paper assesses the influence of trunk rotation on finger trajectories and on interjoint coordination and determines whether simultaneous turn-and-reach movements are most simply described relative to a trunk-based or an external reference frame. Subjects reached to targets requiring different extents of arm joint and trunk rotation at a natural pace and quickly in normal lighting and in total darkness. We first examined whether the larger interaction torques generated during rapid turn-and-reach movements perturb finger trajectories and interjoint coordination and whether visual feedback plays a role in compensating for these torques. These issues were addressed using generalized Procrustes analysis (GPA), which attempts to overlap a group of configurations (e.g., joint trajectories) through translations and rotations in multi-dimensional space. We first used GPA to identify the mean intrinsic patterns of finger and joint trajectories (i.e., their average shape irrespective of location and orientation variability in the external and joint workspaces) from turn-and-reach movements performed in each experimental condition and then calculated their curvatures. We then quantified the discrepancy between each finger or joint trajectory and the intrinsic pattern both after GPA was applied individually to trajectories from a pair of experimental conditions and after GPA was applied to the same trajectories pooled together. For several subjects, joint trajectories but not finger trajectories were more curved in fast than slow movements. The curvature of both joint and finger trajectories of turn-and-reach movements was relatively unaffected by the vision conditions. Pooling across speed conditions significantly increased the discrepancy between joint but not finger trajectories for

  9. 76 FR 13197 - National Institute of Environmental Health Sciences Strategic Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ... Strategic Planning AGENCY: National Institutes of Health (NIH), National Institute of Environmental Health... planning process is to define an overarching Vision Statement, Strategic Goals, and Implementation... background and follow the progress of this planning process, visit the NIEHS Strategic Planning Web site...

  10. 49 CFR 520.25 - External review of draft environmental impact statements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... by law or special expertise with respect to the possible environmental impact involved, and from the... special expertise or jurisdiction by law with regard to the potential environmental impact involved. These... with known responsibilities in environmental matters, and shall be obtained as follows: (i)...

  11. 49 CFR 520.25 - External review of draft environmental impact statements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... by law or special expertise with respect to the possible environmental impact involved, and from the... special expertise or jurisdiction by law with regard to the potential environmental impact involved. These... with known responsibilities in environmental matters, and shall be obtained as follows: (i)...

  12. 78 FR 19523 - General Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... National Park Service General Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation Area and Alibates Flint Quarries National Monument, Texas AGENCY: National Park Service, Interior... Impact Statement for the General Management Plan, Lake Meredith National Recreation Area and......

  13. [Agricultural activity and environmental externality: an analysis of the use of pesticides in the Brazilian savannah].

    PubMed

    Soares, Wagner Lopes; Porto, Marcelo Firpo

    2007-01-01

    This paper discusses the negative externalities associated with the intensive use of pesticides in the Brazilian savannah. These externalities are mainly related to impacts on the environment and on human health (rural workers and families, consumers), the costs of which end up being socialized. The externality considered in the present paper is of soil and water contamination by pesticides. The data source is the questionnaire of the Basic Municipal Information Research applied in 2003. Maps are used in order to associate contaminated areas with agricultural activity. Some risk factors associated with soil and water contamination by pesticides such as seasonal crop area, air pollution by burning and weed proliferation, were obtained through a logistic regression. The study concludes that the results can be helpful to formulate policies and aid in the design of regulating instruments and the definition of priority areas where preventive actions should be implemented.

  14. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    SciTech Connect

    Larsen, Barbara L.

    2007-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  15. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    SciTech Connect

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  16. 2006 Long Range Development Plan Final Environmental ImpactReport

    SciTech Connect

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been reduced since the Notice of Preparation for

  17. Planned Environmental Microbiology Aspects of Future Lunar and Mars Missions

    NASA Technical Reports Server (NTRS)

    Ott, C. Mark; Castro, Victoria A.; Pierson, Duane L.

    2006-01-01

    With the establishment of the Constellation Program, NASA has initiated efforts designed similar to the Apollo Program to return to the moon and subsequently travel to Mars. Early lunar sorties will take 4 crewmembers to the moon for 4 to 7 days. Later missions will increase in duration up to 6 months as a lunar habitat is constructed. These missions and vehicle designs are the forerunners of further missions destined for human exploration of Mars. Throughout the planning and design process, lessons learned from the International Space Station (ISS) and past programs will be implemented toward future exploration goals. The standards and requirements for these missions will vary depending on life support systems, mission duration, crew activities, and payloads. From a microbiological perspective, preventative measures will remain the primary techniques to mitigate microbial risk. Thus, most of the effort will focus on stringent preflight monitoring requirements and engineering controls designed into the vehicle, such as HEPA air filters. Due to volume constraints in the CEV, in-flight monitoring will be limited for short-duration missions to the measurement of biocide concentration for water potability. Once long-duration habitation begins on the lunar surface, a more extensive environmental monitoring plan will be initiated. However, limited in-flight volume constraints and the inability to return samples to Earth will increase the need for crew capabilities in determining the nature of contamination problems and method of remediation. In addition, limited shelf life of current monitoring hardware consumables and limited capabilities to dispose of biohazardous trash will drive flight hardware toward non-culture based methodologies, such as hardware that rapidly distinguishes biotic versus abiotic surface contamination. As missions progress to Mars, environmental systems will depend heavily on regeneration of air and water and biological waste remediation and

  18. 78 FR 56729 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... Fish and Wildlife Service Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement; Beech Ridge Wind Power Project, Greenbrier and Nicholas Counties, West Virginia AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability: final environmental...

  19. 78 FR 13081 - Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... National Park Service Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida AGENCY: National Park Service, Interior. ACTION: Notice of Availability. SUMMARY... National Park Service (NPS) announces the availability of the Draft Environmental Impact Statement...

  20. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    SciTech Connect

    LaFreniere, L. M.

    2012-07-15

    what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.

  1. A Guide for Teaching Regional Environmental Planning. Final Report of Project - Inservice Personnel Development: Regional Environmental Planning Workshops for Tri-County Secondary School Teachers.

    ERIC Educational Resources Information Center

    Gallagher, James Joseph, Ed.

    This guide is designed for teachers, administrators, inservice leaders, and teacher educators. Its purpose is to provide an organizational framework, material, and resources for the development of instructional plans and strategies for incorporating regional environmental planning in the secondary school curriculum. The guide is divided into three…

  2. Planning combined treatments of external beam radiation therapy and molecular radiotherapy.

    PubMed

    Cremonesi, Marta; Ferrari, Mahila; Botta, Francesca; Guerriero, Francesco; Garibaldi, Cristina; Bodei, Lisa; De Cicco, Concetta; Grana, Chiara Maria; Pedroli, Guido; Orecchia, Roberto

    2014-08-01

    Molecular radiotherapy (MRT) with radiolabeled molecules has being constantly evolving, leading to notable results in cancer treatment. In some cases, the absorbed doses delivered to tumors by MRT are sufficient to obtain complete responses; in other cases, instead, to be effective, MRT needs to be combined with other therapeutic approaches. Recently, several studies proposed the combination of MRT with external beam radiation therapy (EBRT). Some describe the theoretical basis within radiobiological models, others report the results of clinical phase I-II studies aimed to assess the feasibility and tolerability. The latter includes the treatment of various tumors, such as meningiomas, paragangliomas, non-Hodgkin's lymphomas, bone, brain, hepatic, and breast lesions. The underlying principle of combined MRT and EBRT is the possibility of exploiting the full potential of each modality, given the different organs at risk. Target tissues can indeed receive a higher irradiation, while respecting the threshold limits of more than one critical tissue. Nevertheless, clinical trials are empirical and optimization is still a theoretical issue. This article describes the state of the art of combined MRT and EBRT regarding the rationale and the results of clinical studies, with special focus on the possibility of treatment improvement.

  3. Environmental, safety, and health plan for the remedial investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    Not Available

    1993-10-01

    This document outlines the environmental, safety, and health (ES&H) approach to be followed for the remedial investigation of Waste Area Grouping (WAG) 10 at Oak at Ridge National Laboratory. This ES&H Plan addresses hazards associated with upcoming Operable Unit 3 field work activities and provides the program elements required to maintain minimal personnel exposures and to reduce the potential for environmental impacts during field operations. The hazards evaluation for WAG 10 is presented in Sect. 3. This section includes the potential radiological, chemical, and physical hazards that may be encountered. Previous sampling results suggest that the primary contaminants of concern will be radiological (cobalt-60, europium-154, americium-241, strontium-90, plutonium-238, plutonium-239, cesium-134, cesium-137, and curium-244). External and internal exposures to radioactive materials will be minimized through engineering controls (e.g., ventilation, containment, isolation) and administrative controls (e.g., procedures, training, postings, protective clothing).

  4. Comprehensive MRI simulation methodology using a dedicated MRI scanner in radiation oncology for external beam radiation treatment planning

    SciTech Connect

    Paulson, Eric S.; Erickson, Beth; Schultz, Chris; Allen Li, X.

    2015-01-15

    Purpose: The use of magnetic resonance imaging (MRI) in radiation oncology is expanding rapidly, and more clinics are integrating MRI into their radiation therapy workflows. However, radiation therapy presents a new set of challenges and places additional constraints on MRI compared to diagnostic radiology that, if not properly addressed, can undermine the advantages MRI offers for radiation treatment planning (RTP). The authors introduce here strategies to manage several challenges of using MRI for virtual simulation in external beam RTP. Methods: A total of 810 clinical MRI simulation exams were performed using a dedicated MRI scanner for external beam RTP of brain, breast, cervix, head and neck, liver, pancreas, prostate, and sarcoma cancers. Patients were imaged in treatment position using MRI-optimal immobilization devices. Radiofrequency (RF) coil configurations and scan protocols were optimized based on RTP constraints. Off-resonance and gradient nonlinearity-induced geometric distortions were minimized or corrected prior to using images for RTP. A multidisciplinary MRI simulation guide, along with window width and level presets, was created to standardize use of MR images during RTP. A quality assurance program was implemented to maintain accuracy and repeatability of MRI simulation exams. Results: The combination of a large bore scanner, high field strength, and circumferentially wrapped, flexible phased array RF receive coils permitted acquisition of thin slice images with high contrast-to-noise ratio (CNR) and image intensity uniformity, while simultaneously accommodating patient setup and immobilization devices. Postprocessing corrections and alternative acquisition methods were required to reduce or correct off-resonance and gradient nonlinearity induced geometric distortions. Conclusions: The methodology described herein contains practical strategies the authors have implemented through lessons learned performing clinical MRI simulation exams. In

  5. Environmental management plan for the Jhario coalfield - India

    SciTech Connect

    Schori, A.; Scrymgeour, A.H.; Munshi, P.L.

    1997-12-31

    An Environmental Management Plan (EMP) for the Jharia Coalfield (JCF) was recently completed as part of a World Bank funded project. The JCF, 260 km west of Calcutta, comprises 450 km{sup 2}. Bharat Coking Coal Limited (BCCL) operates an area of 258 km{sup 2}. Coal mining has been conducted for more than 100 years. There are severe constraints to mining due to geology, coal fires and the large population. BCCL counterpart staff participated actively in all aspects of the work. Air and water are heavily polluted, however, mining operations contribute only to a limited extent to the total pollution. Water contamination is generally due to inadequate sewage treatment and discharge from non-mine facilities such as power plants. The large area disturbed by mining to date will increase, as open pit mining operations are expected to expand significantly. Reclamation to date is generally confined to planting of trees. Areas where cost effective reclamation can be done were identified. Key recommendations include: integrate reclamation activities and mine operations for all future mining; conduct minimal, cost effective, reclamation of areas disturbed to date; continue monitoring programs; investigate feasibility of small reservoirs for water management.

  6. Active Sites Environmental Monitoring Program: Program plan. Revision 1

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1992-02-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of transuranic (TRU) waste and active low-level waste (LLW) facilities at Oak Ridge National Laboratory (ORNL) in accordance with US Department of Energy (DOE) Order 5820.2A. Active LLW facilities in Solid Waste Storage Area (SWSA) 6 include Tumulus I and Tumulus II, the Interim Waste Management Facility (IWMF), LLW silos, high-range wells, asbestos silos, and fissile wells. The tumulus pads and IWMF are aboveground, high-strength concrete pads on which concrete vaults containing metal boxes of LLW are placed; the void space between the boxes and vaults is filled with grout. Eventually, these pads and vaults will be covered by an engineered multilayered cap. All other LLW facilities in SWSA 6 are below ground. In addition, this plan includes monitoring of the Hillcut Disposal Test Facility (HDTF) in SWSA 6, even though this facility was completed prior to the data of the DOE order. In SWSA 5 North, the TRU facilities include below-grade engineered caves, high-range wells, and unlined trenches. All samples from SWSA 6 are screened for alpha and beta activity, counted for gamma-emitting isotopes, and analyzed for tritium. In addition to these analytes, samples from SWSA 5 North are analyzed for specific transuranic elements.

  7. Exploring environmental literacy in low-literate communities of Pakistan: A descriptive study to recommend strategies for planning environmental education programs

    NASA Astrophysics Data System (ADS)

    Daudi, Sabiha Shafique

    2000-10-01

    The widely accepted definition of environmental education as stated by The Tbilisi Declaration of 1978 focuses on developing an environmentally literate citizenry which is capable of working "...individually and collectively toward solutions of current [environmental] problems and the prevention of new ones". The two basic tenets of environmental literacy are further defined in this study as the ability to understand environmental problems and the ability to address those environmental problems in a responsible manner. Acquisition of knowledge has also been considered an important element when developing environmental literacy programs. However, a large sector of the world population is non- or low-literate and communication is through channels other than the written word. The challenge for environmental educators is to reach the low-literate learners who have not had many opportunities to participate in formal education activities through established institutions. The purpose of this study was to describe levels of environmental literacy in communities with varying levels of formal literacy in two cities, Karachi and Islamabad, Pakistan to determine the role formal literacy plays in enhancing environmental literacy and decision making in relation to age, sex, location, number of years spent in formal education, and the socio-economic status (SES) of adult learners. Based on the outcomes, recommendations were made for designing effective programs to ensure involvement of low-literate communities in established decision-making processes through relevant program planning. This study suggested strategies to program planners and environmental educators for designing programs that reach low-literate communities, highlight local environmental concerns, and empower these communities in addressing local environmental issues. A purposive sample was identified from the constituencies of five non-governmental organizations in Karachi and Islamabad, Pakistan. Two instruments

  8. Environmental Externalities in Electric Power Markets: Acid Rain, Urban Ozone, and Climate Change

    EIA Publications

    1995-01-01

    This article discusses the emissions resulting from the generation of electricity by utilities and their role in contributing to the environmental problems of acid rain, urban ozone, and climate change.

  9. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... National Park Service Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand... Availability of a Record of Decision on the Final Environmental Impact Statement for the Fire Management Plan.... 4332(2)(C), the National Park Service announces the availability of the Record of Decision for the...

  10. 77 FR 12323 - Draft Environmental Impact Statement for the General Management Plan, Buck Island Reef National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... National Park Service Draft Environmental Impact Statement for the General Management Plan, Buck Island Reef National Monument, Virgin Islands AGENCY: National Park Service, Interior. ACTION: Notice of Availability of a Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Buck...

  11. 36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Consistency with plans, environmental standards, and other management requirements. 223.218 Section 223.218 Parks, Forests, and Public... Special Forest Products § 223.218 Consistency with plans, environmental standards, and other...

  12. 76 FR 79708 - Draft Environmental Impact Statement/General Management Plan, Golden Gate National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... National Park Service Draft Environmental Impact Statement/General Management Plan, Golden Gate National Recreation Area, CA AGENCY: National Park Service, Interior. ACTION: Notice of Extended Public Comment Period for Draft Environmental Impact Statement/General Management Plan, Golden Gate National Recreation...

  13. 43 CFR 3900.50 - Land use plans and environmental considerations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Land use plans and environmental...-GENERAL Oil Shale Management-Introduction § 3900.50 Land use plans and environmental considerations. (a... will be issued in conformance with the decisions, terms, and conditions of a comprehensive land...

  14. 43 CFR 3900.50 - Land use plans and environmental considerations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Land use plans and environmental...-GENERAL Oil Shale Management-Introduction § 3900.50 Land use plans and environmental considerations. (a... will be issued in conformance with the decisions, terms, and conditions of a comprehensive land...

  15. 43 CFR 3900.50 - Land use plans and environmental considerations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Land use plans and environmental...-GENERAL Oil Shale Management-Introduction § 3900.50 Land use plans and environmental considerations. (a... will be issued in conformance with the decisions, terms, and conditions of a comprehensive land...

  16. 43 CFR 3900.50 - Land use plans and environmental considerations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Land use plans and environmental...-GENERAL Oil Shale Management-Introduction § 3900.50 Land use plans and environmental considerations. (a... will be issued in conformance with the decisions, terms, and conditions of a comprehensive land...

  17. 75 FR 44977 - General Management Plan/Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... National Park Service General Management Plan/Abbreviated Final Environmental Impact Statement, Roosevelt... Management Plan, Roosevelt-Vanderbilt National Historic Sites, Hyde Park, NY. SUMMARY: Pursuant to National Environmental Policy Act of 1969, 42 U.S.C. 4332 (2) (C), the National Park Service (NPS) announces...

  18. 76 FR 27087 - Draft Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... National Park Service Draft Environmental Impact Statement for the Winter Use Plan, Yellowstone National... Draft Environmental Impact Statement (DEIS) for a Winter Use Plan for Yellowstone National Park, located..., Yellowstone National Park, P.O. Box 168, Yellowstone National Park, Wyoming 82190. If you wish to comment...

  19. 76 FR 51395 - Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Canaveral...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... National Park Service Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP... Draft Environmental Impact Statement for the General Management Plan (DEIS/GMP), Canaveral National... 1969 the NPS announces the availability of a DEIS/GMP for Canaveral National Seashore, Florida....

  20. Evaluating the implementation of environmental review mitigation in local planning and development processes

    SciTech Connect

    Slotterback, Carissa Schively

    2008-11-15

    The implementation of mitigation strategies and outcomes of environmental review remains a challenge for planners and regulators. While the process and content of environmental review is clearly defined, there is often little attention to what happens after the review is completed. This paper presents the results of an evaluation of the implementation of the outcomes of environmental review, specifically mitigation measures designed to respond to environmental impacts identified in the environmental impact analysis. Drawing on previous evaluations of environmental review outcomes and plan implementation, the research provides a methodology for evaluating the implementation of mitigation efforts, points to the challenges associated with implementing the mitigation outcomes of local environmental review in planning and development processes, and identifies opportunities to integrate planning and environmental review processes.

  1. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    SciTech Connect

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  2. 77 FR 12877 - Record of Decision for the General Management Plan/Abbreviated Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... National Park Service Record of Decision for the General Management Plan/Abbreviated Final Environmental... Management Plan for New River Gorge National River, West Virginia. The Record of Decision selects the approved general management plan for New River Gorge National River for the next 15 to 20 years....

  3. 78 FR 55093 - Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-09

    ... National Park Service Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate... Statement for the Dog Management Plan (Plan/SEIS), Golden Gate National Recreation Area (GGNRA), California. Current dog management in the park is based on a number of factors. Areas included in the GGNRA...

  4. 76 FR 55939 - Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Bureau of Land Management Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact Statement for the Lander Resource Management Plan Revision Project, Lander Field Office...: You may submit comments related to the Lander Resource Management Plan Revision Project by any of...

  5. Treatment planning systems for external whole brain radiation therapy: With and without MLC (multi leaf collimator) optimization

    NASA Astrophysics Data System (ADS)

    Budiyono, T.; Budi, W. S.; Hidayanto, E.

    2016-03-01

    Radiation therapy for brain malignancy is done by giving a dose of radiation to a whole volume of the brain (WBRT) followed by a booster at the primary tumor with more advanced techniques. Two external radiation fields given from the right and left side. Because the shape of the head, there will be an unavoidable hotspot radiation dose of greater than 107%. This study aims to optimize planning of radiation therapy using field in field multi-leaf collimator technique. A study of 15 WBRT samples with CT slices is done by adding some segments of radiation in each field of radiation and delivering appropriate dose weighting using a TPS precise plan Elekta R 2.15. Results showed that this optimization a more homogeneous radiation on CTV target volume, lower dose in healthy tissue, and reduced hotspots in CTV target volume. Comparison results of field in field multi segmented MLC technique with standard conventional technique for WBRT are: higher average minimum dose (77.25% ± 0:47%) vs (60% ± 3:35%); lower average maximum dose (110.27% ± 0.26%) vs (114.53% ± 1.56%); lower hotspot volume (5.71% vs 27.43%); and lower dose on eye lenses (right eye: 9.52% vs 18.20%); (left eye: 8.60% vs 16.53%).

  6. Exxon Valdez restoration plan. summary of the final environmental impact statement

    SciTech Connect

    1994-09-01

    The Exxon Valdez Trustee Council issued a draft Restoration Plan in November of 1993. The draft Restoration Plan provides long-term guidance for restoring the resources and services injured by the Exxon Valdez Oil Spill of March 24, 1989. This final Environmental Impact Statement (FEIS) analyzes the potential environmental impacts of the draft Restoration Plan as the Proposed Action - Alternative 5, and four other alternatives that provide different policies and emphasis than the proposed action.

  7. Conservation Plan, Seaman Outdoor Laboratory for Environmental Education.

    ERIC Educational Resources Information Center

    Topeka Unified School District 345, KS.

    This guide focuses on the conservation plan for an outdoor laboratory. Although the plan focuses specifically on Seaman Outdoor Education Laboratory, the concepts could be applied to any natural area including parks, farms, and school grounds. Along with an introduction and justification, the guide includes the conservation plan that serves as the…

  8. 75 FR 19422 - Availability of a Final Environmental Impact Statement for the General Management Plan (FEIS/GMP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-14

    ... Planning) and Director's Order Number 12 (Conservation Planning, Environmental Impact Analysis, and... of visitor interpretive programs and recreational opportunities. Alternative E would emphasize...

  9. MISSE-X: An ISS External Platform for Space Environmental Studies in the Post-Shuttle Era

    NASA Technical Reports Server (NTRS)

    Thibeault, Sheila A.; Cooke, Stuart A.; Ashe, Melissa P.; Saucillo, Rudolph J.; Murphy, Douglas G.; deGroh, Kim K.; Jaworske, Donald A.; Nguyen, Quang-Viet

    2011-01-01

    Materials International Space Station Experiment-X (MISSE-X) is a proposed International Space Station (ISS) external platform for space environmental studies designed to advance the technology readiness of materials and devices critical for future space exploration. The MISSE-X platform will expand ISS utilization by providing experimenters with unprecedented low-cost space access and return on investment (ROI). As a follow-on to the highly successful MISSE series of ISS experiments, MISSE-X will provide advances over the original MISSE configurations including incorporation of plug-and-play experiments that will minimize return mass requirements in the post-Shuttle era, improved active sensing and monitoring of the ISS external environment for better characterization of environmental effects, and expansion of the MISSE-X user community through incorporation of new, customer-desired capabilities. MISSE-X will also foster interest in science, technology, engineering, and math (STEM) in primary and secondary schools through student collaboration and participation.1,2

  10. Addressing Externalities From Swine Production to Reduce Public Health and Environmental Impacts

    PubMed Central

    Osterberg, David; Wallinga, David

    2004-01-01

    Animal agriculture in the United States for the most part has industrialized, with negative consequences for air and water quality and antibiotic use. We consider health and environmental impacts of current US swine production and give an overview of current federal, state, and local strategies being used to address them. PMID:15451736

  11. Linking Environmental Science Students to External Community Partners: A Critical Assessment of a Service Learning Course

    ERIC Educational Resources Information Center

    Grossman, Julie; Cooper, Terrence

    2004-01-01

    This article describes a course that integrates environmental science students into local community organizations. Despite initially high expectations, students who completed the course held negative opinions about their experience because of inadequate community partner preparation. Based on the course's successes and challenges, in this article,…

  12. Assessing environmental assets for health promotion program planning: a practical framework for health promotion practitioners.

    PubMed

    Springer, Andrew E; Evans, Alexandra E

    2016-01-01

    Conducting a health needs assessment is an important if not essential first step for health promotion planning. This paper explores how health needs assessments may be further strengthened for health promotion planning via an assessment of environmental assets rooted in the multiple environments (policy, information, social and physical environments) that shape health and behavior. Guided by a behavioral-ecological perspective- one that seeks to identify environmental assets that can influence health behavior, and an implementation science perspective- one that seeks to interweave health promotion strategies into existing environmental assets, we present a basic framework for assessing environmental assets and review examples from the literature to illustrate the incorporation of environmental assets into health program design. Health promotion practitioners and researchers implicitly identify and apply environmental assets in the design and implementation of health promotion interventions;this paper provides foundation for greater intentionality in assessing environmental assets for health promotion planning. PMID:27579254

  13. Assessing environmental assets for health promotion program planning: a practical framework for health promotion practitioners

    PubMed Central

    Springer, Andrew E.; Evans, Alexandra E.

    2016-01-01

    Conducting a health needs assessment is an important if not essential first step for health promotion planning. This paper explores how health needs assessments may be further strengthened for health promotion planning via an assessment of environmental assets rooted in the multiple environments (policy, information, social and physical environments) that shape health and behavior. Guided by a behavioral-ecological perspective- one that seeks to identify environmental assets that can influence health behavior, and an implementation science perspective- one that seeks to interweave health promotion strategies into existing environmental assets, we present a basic framework for assessing environmental assets and review examples from the literature to illustrate the incorporation of environmental assets into health program design. Health promotion practitioners and researchers implicitly identify and apply environmental assets in the design and implementation of health promotion interventions;this paper provides foundation for greater intentionality in assessing environmental assets for health promotion planning. PMID:27579254

  14. Assessing environmental assets for health promotion program planning: a practical framework for health promotion practitioners.

    PubMed

    Springer, Andrew E; Evans, Alexandra E

    2016-01-01

    Conducting a health needs assessment is an important if not essential first step for health promotion planning. This paper explores how health needs assessments may be further strengthened for health promotion planning via an assessment of environmental assets rooted in the multiple environments (policy, information, social and physical environments) that shape health and behavior. Guided by a behavioral-ecological perspective- one that seeks to identify environmental assets that can influence health behavior, and an implementation science perspective- one that seeks to interweave health promotion strategies into existing environmental assets, we present a basic framework for assessing environmental assets and review examples from the literature to illustrate the incorporation of environmental assets into health program design. Health promotion practitioners and researchers implicitly identify and apply environmental assets in the design and implementation of health promotion interventions;this paper provides foundation for greater intentionality in assessing environmental assets for health promotion planning.

  15. Environmental implementation plan: Chapter 5, Chemical management, pollution prevention and other compliance programs. Draft revision

    SciTech Connect

    Peterson, G.L.

    1993-11-18

    Compliance with environmental regulations and US Department of Energy Orders (DOE) relating to environmental protection is an important part of SRS`s program. Over the past few years, the number of environmental regulations has increased. The strategy to comply with new and existing environmental regulations and DOE orders is described in chapter two. In this chapter, the following environmental programs are described: Toxic Substances Control Act (TSCA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Emergency Planning and Community Right-to-Know Act (EPCRA); and SPCC/BMP/Pollution Prevention Plans;The implementation section identifies issues and those responsible to achieve defined objectives.

  16. 77 FR 33239 - Prairie Stewardship Plan/Environmental Impact Statement, San Juan Island National Historical Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... National Park Service Prairie Stewardship Plan/Environmental Impact Statement, San Juan Island National Historical Park AGENCY: National Park Service, Interior. ACTION: Notice of Intent to Prepare an Environmental... Park Service (NPS) is initiating the preparation of an Environmental Impact Statement (EIS) for...

  17. 75 FR 25288 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Environmental Impact Statement for the Pocatello Field Office, Idaho AGENCY: Bureau of Land Management, Interior... Management (BLM) has prepared a Proposed Resource Management Plan/Final Environmental Impact Statement... clarify proposed management direction and update the analysis of potential environmental impacts, but...

  18. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... University Laboratories XL Project-Laboratory Environmental Management Standard § 262.105 What must be... Management Standard. (6) Ensure that: (i) Its Environmental Management Plan is available to laboratory..., Laboratory Environmental Management Standard performance data, assessment and audit results and...

  19. Statistical Modeling of the Eye for Multimodal Treatment Planning for External Beam Radiation Therapy of Intraocular Tumors

    SciTech Connect

    Rueegsegger, Michael B.; Bach Cuadra, Meritxell; Pica, Alessia; Amstutz, Christoph A.; Rudolph, Tobias; Aebersold, Daniel; Kowal, Jens H.

    2012-11-15

    Purpose: Ocular anatomy and radiation-associated toxicities provide unique challenges for external beam radiation therapy. For treatment planning, precise modeling of organs at risk and tumor volume are crucial. Development of a precise eye model and automatic adaptation of this model to patients' anatomy remain problematic because of organ shape variability. This work introduces the application of a 3-dimensional (3D) statistical shape model as a novel method for precise eye modeling for external beam radiation therapy of intraocular tumors. Methods and Materials: Manual and automatic segmentations were compared for 17 patients, based on head computed tomography (CT) volume scans. A 3D statistical shape model of the cornea, lens, and sclera as well as of the optic disc position was developed. Furthermore, an active shape model was built to enable automatic fitting of the eye model to CT slice stacks. Cross-validation was performed based on leave-one-out tests for all training shapes by measuring dice coefficients and mean segmentation errors between automatic segmentation and manual segmentation by an expert. Results: Cross-validation revealed a dice similarity of 95% {+-} 2% for the sclera and cornea and 91% {+-} 2% for the lens. Overall, mean segmentation error was found to be 0.3 {+-} 0.1 mm. Average segmentation time was 14 {+-} 2 s on a standard personal computer. Conclusions: Our results show that the solution presented outperforms state-of-the-art methods in terms of accuracy, reliability, and robustness. Moreover, the eye model shape as well as its variability is learned from a training set rather than by making shape assumptions (eg, as with the spherical or elliptical model). Therefore, the model appears to be capable of modeling nonspherically and nonelliptically shaped eyes.

  20. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    SciTech Connect

    Not Available

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  1. Environmental planning, ecosystem science, and ecosystem approaches for integrating environment and development

    NASA Astrophysics Data System (ADS)

    Slocombe, D. Scott

    1993-05-01

    Currently popular concepts such as sustainable development and sustainability seek the integration of environment and development planning. However, there is little evidence that this integration is occurring in either mainstream development planning or environmental planning. This is a function of the history, philosophies, and evolved roles of both. A brief review of the experience and results of mainstream planning, environmental planning, and ecosystem science suggests there is much in past scientific and professional practice that is relevant to the goal of integrated planning for environment and development, but still such commonly recommended reforms as systems and multidisciplinary approaches, institutional integration, and participatory, goal-oriented processes are rarely achieved. “Ecosystem approaches,” as developed and applied in ecology, human ecology, environmental planning, anthropology, psychology, and other disciplines, may provide a more transdisciplinary route to successful integration of environment and development. Experience with ecosystem approaches is reviewed, their advantages and disadvantages are discussed, and they are compared to traditional urban and regional planning, environmental planning, and ecosystem science approaches. Ultimately a synthesis of desirable characteristics for a framework to integrate environment and development planning is presented as a guide for future work and a criterion for evaluating existing programs.

  2. Final Report on the External Peer Review of the U.S. Environmental Protection Agency's IRIS Reassessment of the Inhalation Carcinogenicity of Naphthalene

    EPA Science Inventory

    This document is the final report for the 2004 external peer review for the IRIS Reassessment of the Inhalation Carcinogenicity of Naphthalene, prepared by the U.S. Environmental Protection Agency (EPA), National Center for Environmental Assessment (NCEA), for the Integrated Risk...

  3. Patterns in Clam Excurrent Siphon Velocity According to External Environmental Cues

    NASA Astrophysics Data System (ADS)

    Webster, D. R.; Delavan, S. K.

    2010-11-01

    This study attempts to determine the patterns and/or randomness of the excurrent velocity of actively feeding clams, Mercenaria mercenaria. We hypothesize that clams alter their feeding current velocity patterns or randomness according to external cues in the environment such as hydrodynamic characteristics, density of the clam patch, and presence of predators in the upstream flow. A PIV system measured vector fields for two-dimensional planes that bisect the clam excurrent siphons, and time records were extracted at the siphon exit position. Fractal and lacunarity analysis of the jet velocity time records revealed that clams alter their jet excurrent velocity unsteadiness according to the horizontal crossflow velocity. The results also reveal that the effect of clam patch density on the feeding activity was dependent on the size of the organism. This size/density dependent relationship suggests that predation by blue crabs dominates the system since larger clams are no longer susceptible to blue crab predation, whereas clams of all sizes are susceptible to whelk predation. Finally, clams increase the randomness of their excurrent jet velocity values when predator cues are located in the upstream flume flow. This suggests that the presence of predators elicits clam behavior that promotes the mixing and dilution of their chemical metabolites.

  4. Health and safety plan for operations performed for the Environmental Restoration Program

    SciTech Connect

    Trippet, W.A. II ); Reneau, M.; Morton, S.L. )

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  5. Strategic environmental assessment of hydrological and irrigation plans in Castilla y Leon, Spain

    SciTech Connect

    Hedo, D.; Bina, O. )

    1999-05-01

    The study illustrates how strategic environmental assessment (SEA) can promote sustainable development plans. It defines and applies an SEA methodology to two draft plans: the hydrological plan for the Duero basin in Spain and the irrigation plan for the region of Castilla y Leon. Although prepared by national and regional authorities, respectively, both draft plans refer to the management and use of water as a resource for economic development and refer roughly to the same area. The SEA addresses the environmental, economic, and social impacts of the combined draft plans, using relevant indicators and objectives. The analysis shows that the proposals would lead to high financial costs and significant negative impacts on the environment for each job created; it develops and assesses a number of alternatives that would address these impacts. The results are used to define SEA procedures for the new Structural Funds period (2000--2006) and will provide a useful lesson for plans at all levels of government within Spain.

  6. Compressed air energy storage (CAES) environmental control concerns and program plan

    SciTech Connect

    Beckwith, M.A.; Boehm, D.W.

    1980-06-01

    This report assesses the required environmental research and recommends a program plan to assist DOD's Environmental Control Technology Division (ECT) in performing its mission of ensuring that the procedures, processes, systems, and strategies necessary to minimize any adverse environmental impacts of compressed air energy storage (CAES) are developed in a timely manner so as not to delay implementation of the technology. To do so, CAES technology and the expected major environmental concerns of the technology are described. Second, ongoing or planned research in related programs and the applicability of results from these programs to CAES environmental research are discussed. Third, the additional research and development required to provide the necessary environmental data base and resolve concerns in CAES are outlined. Finally, a program plan to carry out this research and development effort is presented.

  7. Environmental externalities: An ASEAN application to coal-based power generation. Extract

    SciTech Connect

    Szpunar, C.B.; Gillette, J.L.

    1992-06-01

    Significant benefits to human health that result from emissions control programs may justify the costs of pollution control policies. Many scientists, economists, risk analysts, and policymakers believe that comparisons of the benefits with the costs of pollution control demonstrate that the US stationary source, air emissions control program is justified. This justification is based upon pronounced benefits to human health, especially from controlling suspended particulates and sulfur compounds. Market decisions are usually made on the basis of a consideration of traditional costs such as capital, operating and maintenance, fuel costs, and fixed charges. Social costs, which could be significant, are not incorporated explicitly into such decisions. These social costs could result in a net reduction in the welfare of individuals, and of society as a whole. Because these social costs and their effects are not represented in the price of energy, individual have no way to explicitly value them; hence, they remain unaccounted for in market decisions. By accounting for external costs, the selection of energy sources and production of energy products can lead to and equilibrium, where the total cost of energy and energy products, together with resulting social costs, can be brought to an economic minimum. The concept of an air emissions control program is of interest to the ASEAN countries (Brunei, Indonesia, Malaysia, the Philippines, Singapore, and Thailand) and their governments, especially if such a program could be justified in cost-benefit terms and shown to be directly applicable to ASEAN conditions. It is the intent of the effort described herein to demonstrate that technical options are available to control emissions from coal-based, electric power plants and that that costs of these options may be justified in cost-benefit terms.

  8. Environmental Restoration Strategic Plan. Remediating the nuclear weapons complex

    SciTech Connect

    1995-08-01

    With the end of the cold war, the US has a reduced need for nuclear weapons production. In response, the Department of Energy has redirected resources from weapons production to weapons dismantlement and environmental remediation. To this end, in November 1989, the US Department of Energy (DOE) established the Office of Environmental Restoration and Waste Management (renamed the Office of Environmental Management in 1994). It was created to bring under a central authority the management of radioactive and hazardous wastes at DOE sites and inactive or shut down facilities. The Environmental Restoration Program, a major component of DOE`s Environmental Management Program, is responsible for the remediation and management of contaminated environmental media (e.g., soil, groundwater, sediments) and the decommissioning of facilities and structures at 130 sites in over 30 states and territories.

  9. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    SciTech Connect

    Not Available

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  10. National, State, and Local Trends: Environmental Scan of Trends and Key Issues Affecting Planning.

    ERIC Educational Resources Information Center

    Kangas, Jon; Budros, Kathleen; Yoshioka, Joyce

    This document is a collection of one-page summaries, or "Trends Newsletters" (Numbers 50, 54-7, 59-60, 67-71, and 73-91), that analyze the national, state, and local trends affecting planning for the San Jose/Evergreen Community College District in California. The document is divided into two sections: External Scan and Internal Scan. Topics…

  11. Framework for integration of urban planning, strategic environmental assessment and ecological planning for urban sustainability within the context of China

    SciTech Connect

    He Jia; Bao Cunkuan; Shu Tingfei; Yun Xiaoxue; Jiang Dahe; Brwon, Lex

    2011-11-15

    Sustainable development or sustainability has been highlighted as an essential principle in urban master planning, with increasing recognition that uncontrollable urbanization may well give rise to various issues such as overexploitation of natural resources, ecosystem destruction, environmental pollution and large-scale climate change. Thus, it is deemed necessary to modify the existing urban and regional administrative system so as to cope with the challenges urban planning is being confronted with and realize the purpose of urban sustainability. This paper contributed to proposing a mechanism which helps to make urban planning with full consideration of issues with respect to sustainable development. We suggested that the integration of urban planning, SEA and ecological planning be a multi-win strategy to offset deficiency of each mentioned political tool being individually applied. We also proposed a framework where SEA and ecological planning are fully incorporated into urban planning, which forms a two-way constraint mechanism to ascertain environmental quality of urban planning, although in practice, planning and SEA processes may conditionally be unified. Moreover, as shown in the case study, the integration of the three political tools may be constrained due to slow changes in the contextual factors, in particular the political and cultural dimensions. Currently within the context of China, there may be three major elements which facilitate integration of the three political tools, which are (1) regulatory requirement of PEIA on urban planning, (2) the promotion or strong administrative support from government on eco-district building, and (3) the willingness of urban planners to collaborate with SEA experts or ecologists.

  12. Nonshared environmental mediation of the association between deviant peer affiliation and adolescent externalizing behaviors over time: results from a cross-lagged monozygotic twin differences design.

    PubMed

    Burt, S Alexandra; McGue, Matt; Iacono, William G

    2009-11-01

    It has been argued that peers are the most important agent of adolescent socialization and, more specifically, that this socialization process occurs at the child-specific (or nonshared environmental) level (J. R. Harris, 1998; R. Plomin & Asbury, 2005). The authors sought to empirically evaluate this nonshared environmental peer influence hypothesis by examining the association between externalizing behaviors and deviant peer affiliation in a sample of 454 pairs of monozygotic (genetically identical) twins, assessed at ages 14 and 17, within a cross-lagged twin differences design. Results argued against a causal nonshared environmental influence of peer affiliation on the development of externalizing behaviors and in favor of nonshared environmental "selection." In particular, the twin with more externalizing behaviors at age 14 reported increased deviant peer affiliation relative to his or her co-twin 3 years later, regardless of his or her genetic predispositions toward externalizing behavior. Such findings suggest that adolescents with higher levels of externalizing behaviors select or shape (either intentionally or inadvertently) subsequent environmental experiences to involve increased affiliation with deviant peers. Implications are discussed.

  13. The Effect of Considering Environmental Aspect to Distribution Planning: A Case in Logistics SME

    NASA Astrophysics Data System (ADS)

    Prambudia, Yudha; Andrian Nur, Andri

    2016-01-01

    Environmental aspect is often neglected in traditional distribution planning process of a product. Especially in small-medium enterprises (SME) of developing countries where cost efficiency is the predominant factor. Bearing in mind that there is a large number of SME's performing logistics activities, the consideration of environmental aspect in their distribution planning process would be beneficial to climate change mitigation efforts. The purpose of this paper is to show the impact of environmental aspect should it be considered as a contributing factor in distribution planning. In this research, an adoption of CO2-emission factor in an SME's distribution planning in Indonesia was simulated. The outputs of distribution planning with and without the factor consideration are then compared. The result shows that adoption of CO2-emission factor would change the priority of delivery route.

  14. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Monocacy National Battlefield

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    .... All historic structures would be preserved with exhibits in the Worthington House and Thomas... Worthington Farm and Thomas Farm. The Draft Environmental Impact Statement for the General Management Plan...

  15. 76 FR 5203 - Draft Environmental Impact Statement, Stehekin River Corridor Implementation Plan, North Cascades...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... National Park Service Draft Environmental Impact Statement, Stehekin River Corridor Implementation Plan, North Cascades National Park Service Complex; Chelan, Skagit, and Whatcom Counties, WA AGENCY: National Park Service, Interior. ACTION: Notice of extension of public comment period. SUMMARY: The...

  16. Strategic Plan for Sustainable Energy Management and Environmental Stewardship for Los Angeles Unified School District

    SciTech Connect

    Walker, A.; Beattie, D.; Thomas, K.; Davis, K.; Sim, M.; Jhaveri, A.

    2007-11-01

    This Strategic Plan for Sustainable Energy Management and Environmental Stewardship states goals, measures progress toward goals and how actions are monitored to achieve continuous improvement for the Los Angeles Unified School District.

  17. 77 FR 22761 - Draft Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... National Oceanic and Atmospheric Administration Draft Management Plan and Environmental Assessment for... Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric Administration... National Oceanic and Atmospheric Administration (NOAA) designated Monitor National Marine Sanctuary...

  18. Environmental Management Systems: A Framework for Planning Green Campuses.

    ERIC Educational Resources Information Center

    Keniry, Julian

    2003-01-01

    Drawing on recent survey data from the National Wildlife Federation and other publications, explains what an environmental management system is and identifies its components; examines how environmental management systems have been applied in higher education settings; reports on trends in implementation; and illustrates how the environmental…

  19. Guidelines for Environmental Education, The Kentucky Plan. 1982 Revision.

    ERIC Educational Resources Information Center

    Howell, Jerry, Ed.

    In 1975, the Kentucky Advisory Council for Environmental Education, consisting of representatives from education, government agencies, business, conservation groups, and concerned citizens, was appointed by the Kentucky Department of Education to develop and promote guidelines which would help increase environmental awareness in Kentucky. As a…

  20. Environmental Scan: 1993-94 Planning/Budgeting Cycle.

    ERIC Educational Resources Information Center

    Sinclair Community Coll., Dayton, OH. Office of Institutional Planning and Research.

    In the past, environmental scanning reports produced by Sinclair Community College (SCC) in Ohio were designed to provide a brief, eclectic, and provocative overview of major trends and issues likely to influence the development of the institution during the upcoming fiscal year. The 1993 Environmental Scan report speculates about long-term…

  1. Strategic plan strategy of the Oak Ridge National Laboratory Environmental Restoration Program

    SciTech Connect

    1995-06-01

    This report provides information about the use of an integrated strategic plan, strategy, and life-cycle baseline in the long range planning and risk process employed by the environmental restoration program at the Oak Ridge National Laboratory (ORNL). Long-range planning is essential because the ER Program encompasses hundreds of sites; will last several decades; and requires complex technology, management, and policy. Long-range planning allows a focused, cost-effective approach to identify and meet Program objectives. This is accomplished through a strategic plan, a strategy, and a life-cycle baseline. This long-range methodology is illustrated below.

  2. Evaluation in environmental planning: assessing environmental, social, economic, and political trade-offs

    SciTech Connect

    McAllister, D.M.

    1980-01-01

    Part I of this book, Introduction and Background Considerations, includes chapters on human values, democratic philosophy, and environmental values to focus attention on those aspects the author considers most relevant to the topic. Part II, Evaluation Methods and Processes, consists of nine chapters that describe and criticize eight leading methodologies in the value-laden and subjective realm of evaluation - providing many ideas for their improvement. Among the issues addressed are: quantification; treatment of equity and intangibles; representation of future generations; technocratic planning; citizen participation; analytic as opposed to holistic assessments; and grand index formulations of social welfare. Part III, Conclusions, consists of only a single chapter, Toward a More-Refined View of Evaluation. Among the conclusions, the author feels that cost/benefit analysis has dominated the field of evaluation too long; and, its weaknesses being recognized has led to development of the other methods. His position is that planners should approach each evaluation as a separate case, selecting that set of techniques most suited to the particular situation; further, good evaluations will result from exercising sound judgments based on knowing the strengths and weaknesses of the various methodologies - rather than following a uniform set of standardized procedures.

  3. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... necessary to comply with 24 CFR part 58, including project specific environmental assessments and clearances... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Eligible planning, urban... Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE...

  4. 77 FR 46518 - Draft Resource Management Plan/General Plan Draft Environmental Impact Statement/Revised Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... Parks and Recreation (CDPR), as the California Environmental Quality Act State lead agency, have made available for public review and comment the San Luis Reservoir State Recreation Area Resource Management... California Department of Parks and Recreation was given the responsibility to plan, design,...

  5. PLANNING CHANGE: CASE STUDIES ILLUSTRATING THE BENEFITS OF GIS AND LAND-USE DATA IN ENVIRONMENTAL PLANNING

    EPA Science Inventory

    A well-established protocol for planning environmentally sustainable development has yet to be agreed upon. Experiences from two highly-studied basins in the United States illustrate some early attempts, their successes, and the obstacles that continue to impede widespread adopt...

  6. 78 FR 24232 - Record of Decision for the Denali Park Road Final Vehicle Management Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... plan/environmental impact statement was published in the Federal Register on August 1, 2011 (FR 45848... final plan/environmental impact statement was published in the Federal Register on July 29, 2012 (FR..., the environmentally preferable alternative, measures adopted to minimize environmental harm,...

  7. Project W-314 phase I environmental permits and approvals plan

    SciTech Connect

    TOLLEFSON, K.S.

    1999-02-24

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided.

  8. 78 FR 13376 - Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... National Park Service Chronic Wasting Disease Management Plan/Environmental Impact Statement, Shenandoah... regulations, the National Park Service (NPS) is preparing a Chronic Wasting Disease Management Plan and... National Park and, should the disease become established, to slow the spread of the disease. To ensure...

  9. 77 FR 35999 - Notice of Availability of the Proposed Resource Management Plan/Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the Lower Sonoran (LS) and Sonoran... Avenue, Phoenix, Arizona 85027; email: blm_az_ls_sdnm_plan@blm.gov . Persons who use a telecommunications... business hours. SUPPLEMENTARY INFORMATION: Compact disks of the LS-SDNM were sent to the...

  10. 77 FR 74508 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... Environmental Impact Statement for the Ring of Fire Resource Management Plan--Haines Planning Area, Alaska... Amendment, 4700 BLM Road, Anchorage, Alaska 99507. Copies of the Draft RMP Amendment/Draft EIS are available... Area is located in southeast Alaska, and consists of approximately 320,000 acres of BLM-managed...

  11. 77 FR 43350 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the San Diego Unified...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Fish and Wildlife Service Draft Environmental Assessment and Proposed Habitat Conservation Plan for the... amended (Act). The application addresses the potential for ``take'' of one federally listed animal, the... program to mitigate the project impacts, as described in the applicant's habitat conservation plan...

  12. 76 FR 65744 - Draft Environmental Assessment and Draft Habitat Conservation Plan for Lower Colorado River...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... Fish and Wildlife Service Draft Environmental Assessment and Draft Habitat Conservation Plan for Lower... Species Act of 1973, as amended. The applicant has completed a draft Habitat Conservation Plan (DHCP) as... Transmission Services Corporation (LCRA; applicant); and 2. LCRA has developed a draft habitat...

  13. Environmentally Sound Small-Scale Livestock Projects. Guidelines for Planning Series Number 5.

    ERIC Educational Resources Information Center

    Jacobs, Linda

    This document was developed in response to the need for simplified technical information for planning environmentally sound small-scale projects in third world countries. It is aimed specifically at those who are planning or managing small-scale livestock projects in less-developed areas of the tropics and sub-tropics. The guidelines included in…

  14. 78 FR 38072 - General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... National Park Service General Management Plan, Final Environmental Impact Statement, Guadalupe Mountains... Plan, Guadalupe Mountains National Park, Texas. DATES: The NPS will execute a Record of Decision no... CONTACT: Dennis A. V squez, Superintendent, Guadalupe Mountains National Park, HC 60, Box 400, Salt...

  15. 76 FR 23337 - Warner Valley Comprehensive Site Plan/Environmental Impact Statement, Lassen Volcanic National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... National Park Service Warner Valley Comprehensive Site Plan/Environmental Impact Statement, Lassen Volcanic National Park, Plumas County, CA AGENCY: National Park Service, Interior. ACTION: Notice of Approval of Record of Decision for the Warner Valley Comprehensive Site Plan, Lassen Volcanic National Park....

  16. The Highland Park Environmental Health Plan: Evaluation and Recommendations for Improving the Urban Environment.

    ERIC Educational Resources Information Center

    Michigan State Dept. of Commerce, Lansing. Community Planning Div.

    The Highland Park environmental health plan includes the following components: Legal and administrative and programmatic relationships, planning studies, residential environment, disease vector control, water and sewage systems, sanitation, air pollution, food protection, industrial and radiological health, and solid waste facilities. (JR)

  17. Environmentally Sound Small-Scale Agricultural Projects: Guidelines for Planning. Revised Edition.

    ERIC Educational Resources Information Center

    Altieri, Miguel; Vukasin, Helen L., Ed.

    Environmental planning requires more than finding the right technology and a source of funds. Planning involves consideration of the social, cultural, economic, and natural environments in which the project occurs. The challenge is to develop sustainable food systems that have reasonable production but do not degrade the resource base and upset…

  18. 77 FR 132 - General Management Plan and Environmental Impact Statement for Lincoln Home National Historic Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... may also view the document via the Internet through the NPS Planning, Environment, and Public Comment... at the park, on the Internet, and at area libraries. A total of 39 comments were received; 35 at the... General Management Plan and Environmental Impact Statement (GMP/EIS) will remain available for...

  19. Application of a computerized environmental information system to master and sector planning

    NASA Technical Reports Server (NTRS)

    Stewart, J. C.

    1978-01-01

    A computerized composite mapping system developed as an aid in the land use decision making process is described. Emphasis is placed on consideration of the environment in urban planning. The presence of alluvium, shallow bedrock, surface water, and vegetation growth are among the environmental factors considered. An analysis of the Shady Grove Sector planning is presented as an example of the use of computerized composite mapping for long range planning.

  20. Selected Bibliographies and State-of-the-Art Review for Environmental Health. Volume 2: Environmental Health References. International Health Planning Reference Series.

    ERIC Educational Resources Information Center

    Fraser, Renee White; Shani, Hadasa

    Intended as a companion piece to volume 2 in the Method Series, Environmental Health Planning (CE 024 230), this second of six volumes in the International Health Planning Reference Series is a combined literature review and annotated bibliography dealing with environmental factors in health planning for developing countries. The review identifies…

  1. Environmental Remediation Strategic Planning of Fukushima Nuclear Accident

    SciTech Connect

    Onishi, Yasuo

    2011-12-01

    Environmntal Remediation Assessment and other respons decision making on Environmental monitoring, experiments and assessment. Preliminary assessment to grasp the overall picture and determine critical locations, phenomena, people, etc. Using simple methods and models.

  2. Deliberate Language Planning in Environmental Education: A CRT/LatCrit Perspective

    ERIC Educational Resources Information Center

    Arreguin-Anderson, Maria G.; Kennedy, Kimberley D.

    2013-01-01

    In this study, the authors narrate a deliberate language planning experience within the dynamics of the first Project WILD environmental workshop conducted in Spanish. Using critical race theory and critical Latino theory the authors explore ways in which an environmental program can be infused with Latino culture and Spanish language to address…

  3. Responding to Environmental Challenges: An Initial Assessment of Higher Education Curricula Needs by Australian Planning Professionals

    ERIC Educational Resources Information Center

    Hurlimann, Anna C.

    2009-01-01

    Environmental planning education has become crucial given the projected implications of climate change for human settlements and nature. However, despite the identified importance of educating planners with regards to sustainability and environmental issues, there has been limited discussion of the topic within literature. In particular, there has…

  4. 78 FR 5494 - Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... National Park Service Off-Road Vehicle Management Plan, Draft Environmental Impact Statement, Lake Meredith.../DEIS evaluates the impacts of four alternatives that address off-road vehicle (ORV) management in the...), the National Park Service (NPS) is releasing a Draft Environmental Impact Statement (DEIS) for the...

  5. 36 CFR 223.30 - Consistency with plans, environmental standards, and other management requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., environmental standards, and other management requirements. 223.30 Section 223.30 Parks, Forests, and Public... Timber Sale Contracts Contract Conditions and Provisions § 223.30 Consistency with plans, environmental standards, and other management requirements. The approving officer will insure that each timber...

  6. 76 FR 51394 - DRAFT General Management Plan and Draft Environmental Impact Statement, Biscayne National Park, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... National Park Service DRAFT General Management Plan and Draft Environmental Impact Statement, Biscayne National Park, FL AGENCY: National Park Service, Interior. ACTION: Notice of Availability of the Draft... Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS) announces...

  7. 78 FR 19733 - Draft General Management Plan and Draft Environmental Impact Statement, Fort Raleigh National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-02

    ... National Park Service Draft General Management Plan and Draft Environmental Impact Statement, Fort Raleigh National Historic Site, North Carolina AGENCY: National Park Service, Interior. ACTION: Notice of... National Park Service announces the availability of a Draft Environmental Impact Statement for the...

  8. 78 FR 8184 - DEEPWATER HORIZON Oil Spill; Final Phase II Early Restoration Plan and Environmental Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... availability of the Phase II DERP/ER was published in the Federal Register on November 6, 2012. (77 FR 66626... DEEPWATER HORIZON Oil Spill; Final Phase II Early Restoration Plan and Environmental Review AGENCY: Interior... (OPA), the National Environmental Policy Act (NEPA), and the Framework Agreement for Early...

  9. 76 FR 78016 - Deepwater Horizon Oil Spill; Draft Phase I Early Restoration Plan and Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ....S. Fish and Wildlife Service, Interior Deepwater Horizon Oil Spill; Draft Phase I Early Restoration... Environmental Policy Act (NEPA), and the Framework Agreement for Early Restoration Addressing Injuries Resulting...) have prepared a Draft Early Restoration Plan and Environmental Assessment (DERP/EA) describing...

  10. A GreenPrint for Minnesota: State Plan for Environmental Education. Second Edition.

    ERIC Educational Resources Information Center

    Minnesota State Office of Environmental Assistance, St. Paul.

    This document provides recommendations and strategies to achieve the goals for environmental education in the state of Minnesota. It represents the second edition of the state plan for Minnesota which provides guidelines to individuals, organizations, and agencies to support environmental education (EE) to achieve state goals. Contents include:…

  11. How Does Education Affect Environmental Knowledge: A Survey in Urban and Regional Planning Education

    ERIC Educational Resources Information Center

    Ergen, Baris; Ergen, Zeynep

    2011-01-01

    This paper aims at measuring of environmental knowledge of students who select environmental science course in Urban and Regional Planning Department at Bozok University. This article includes a survey research, with this survey, we can get information about knowledge of environment of students and where they learn them. First briefly, it provides…

  12. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ..., for which notice was provided in the Federal Register on July 26, 2006 (71 FR 42415). The Kerr... Bureau of Indian Affairs Final Environmental Impact Statement for Drought Management Planning at the Kerr... Affairs (BIA) provides this notice that the Final Environmental Impact Statement (FEIS) for...

  13. 75 FR 30849 - Notice of Availability of Draft General Management Plan/Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... availability of a draft General Management Plan/ Environmental Impact Statement (GMP/EIS) for Lincoln Home National Historic Site, Illinois. DATES: The draft GMP/EIS will remain available for public review for 60.... Environmental Protection Agency. Public meetings will be held during the 60-day review period on the GMP/EIS...

  14. 77 FR 62528 - Termination of Environmental Impact Statement for the General Management Plan, Mount Rushmore...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... preparation of an environmental impact statement (EIS) for the Mount Rushmore National Memorial General... be available by contacting park staff at the address below. ADDRESSES: Mount Rushmore National... National Park Service Termination of Environmental Impact Statement for the General Management Plan,...

  15. 78 FR 12353 - Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... National Park Service Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park AGENCY: National Park Service, Interior. ACTION: Notice of Availability. SUMMARY: Pursuant to the National Environmental Policy Act of 1969, 42 U.S.C. 4332(2)(C), the National Park Service (NPS)...

  16. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false What must be included in the laboratory environmental management plan? 262.105 Section 262.105 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS APPLICABLE TO GENERATORS OF HAZARDOUS...

  17. Environmentally Sound Small-Scale Forestry Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Ffolliott, Peter F.; Thames, John L.

    This manual, the third in a series of publications that address community development possibilities in developing nations, provides guidelines for small-scale forestry projects that are integrative and conservation-oriented. Chapters focus on: (1) users and uses (specifying targeted audience and general objectives); (2) planning process (including…

  18. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    SciTech Connect

    Not Available

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  19. Faculty internships in environmental health: planning and implementation.

    PubMed

    Bermúdez, Eliezer

    2005-12-01

    Faculty internships, in which a faculty member works temporarily for a government organization or a private business, are a concept that is becoming popular at universities. This paper discusses how a faculty internship can be developed and implemented, and it reports on the advantages of the internship for academia, the sponsoring institution, and the professor. In addition, suggestions on structuring and implementing the internship are offered. The major objective of the paper is to encourage environmental health educators to seriously consider faculty internships as a means of bridging the gaps between academia and the business world. Faculty internships should be beneficial primarily for two groups of professors. First are those professors who, after earning doctorates, enter the teaching profession without any environmental health practicum experience. Second are those who once worked full time as environmental health practitioners but have been out of the field for a significant number of years with little or no contact with the "real world" of environmental health practice. The information presented is based on the experience of the author, who served as a faculty intern for the environmental health division of a county health department in rural west-central Indiana, Some of the benefits of faculty internships are improved teaching methods, practical experience, community contacts, and increased internship opportunities for students. The experience can enhance classroom theory for students, and the implementation of practice can be clarified for the educator.

  20. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    SciTech Connect

    Not Available

    1993-11-01

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  1. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    SciTech Connect

    Not Available

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  2. 77 FR 53221 - Santa Clara Valley Habitat Conservation Plan/Natural Community Conservation Plan, Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... EIS for this project in the Federal Register on September 6, 2007 (72 FR 51247). The NOI announced a... published a notice of availability of the Draft Plan, EIS, and IA in the Federal Register (75 FR 79013). Two... Chief, Conservation Planning; or Eric Tattersall, Deputy Assistant Field Supervisor,...

  3. Alternative Futures for Environmental Policy Planning: 1975-2000.

    ERIC Educational Resources Information Center

    Elgin, Duane S.; And Others

    This report explores a range of alternative futures covering the next 25 years (1975-2000). These concentrate on the United States, but place this nation's future experience in a world context. It is believed that by exploring the uncertainty of the near future and placing boundaries on it, environmental policy planners will be provided with an…

  4. Can We Predict Plan Quality for External Beam Partial Breast Irradiation: Results of a Multicenter Feasibility Study (Trans Tasman Radiation Oncology Group Study 06.02)

    SciTech Connect

    Kron, Tomas; Willis, David; Link, Emma; Lehman, Margot; Campbell, Gillian; O'Brien, Peter; Chua, Boon

    2013-11-15

    Purpose: Partial breast irradiation (PBI) after lumpectomy may be an option for selected patients with early breast cancer. A feasibility study of accelerated PBI delivered using external beam 3-dimensional conformal radiation therapy (RT) was undertaken at 8 Australasian centers. The present study evaluated the impact of patient, tumor, and RT technique-related factors on the quality of RT plans as determined by the dose–volume parameters of organs at risk. Methods and Materials: Forty-eight patients were enrolled in the study. All RT plans were centrally reviewed using predefined dosimetric criteria before commencement and after completion of protocol therapy. The RT plans of 47 patients met the dose–volume constraints, and all 47 patients received PBI to a prescribed dose of 38.5 Gy in 10 fractions. The RT plan quality was determined by volumes of the ipsilateral whole breast, lung, and heart that received 50% and 95%; 30%; and 5% of the prescribed dose, respectively. Patient, tumor, and RT technique-related factors were investigated for association with the parameters of RT plan quality. Results: The ratio of the planning target volume to the ipsilateral whole-breast volume was significantly associated with the ipsilateral breast doses on multiple variable analyses. The distance of the postlumpectomy surgical cavity from the heart and lung were predictive for heart and lung doses, respectively. A distance between surgical cavity and heart of >4 cm typically resulted in <1% of the heart volume receiving 5 Gy or less. It was more difficult to meet the heart dose constraint for left-sided and medially located tumors. Conclusions: Partial breast irradiation using 3-dimensional conformal RT was feasible within the study constraints. The ratio of planning target volume to ipsilateral whole-breast volume and the distance of surgical cavity from the heart were significant predictors of the quality of treatment plan for external beam PBI.

  5. Associations Between Prenatal Cigarette Smoke Exposure and Externalized Behaviors at School Age Among Inuit Children Exposed to Environmental Contaminants

    PubMed Central

    Desrosiers, Caroline; Boucher, Olivier; Forget-Dubois, Nadine; Dewailly, Éric; Ayotte, Pierre; Jacobson, Sandra W.; Jacobson, Joseph L.; Muckle, Gina

    2013-01-01

    Background Smoking during pregnancy is common among Inuit women from the Canadian Arctic. Yet, prenatal cigarette smoke exposure (PCSE) is seen as a major risk factor for childhood behavior problems. Recent data also suggest that co-exposure to neurotoxic environmental contaminants can exacerbate the effects of PCSE on behavior. This study examined the association between PCSE and behavior at school age in a sample of Inuit children from Nunavik, Québec, where co-exposure to environmental contaminants is also an important issue. Interactions with lead (Pb) and mercury (Hg), two contaminants associated with behavioral problems, were also explored. Methods Participants were 271 children (mean age = 11.3 years) involved in a prospective birth-cohort study. PCSE was assessed through maternal recall. Assessment of child behavior was obtained from the child’s classroom teacher on the Teacher Report Form (TRF) and the Disruptive Behavior Disorders Rating Scale (DBD). Exposure to contaminants was assessed from umbilical cord and child blood samples. Other confounders were documented by maternal interview. Results After control for contaminants and confounders, PCSE was associated with increased externalizing behaviors and attention problems on the TRF and higher prevalence of attention deficit hyperactivity disorder (ADHD) assessed on the DBD. No interactions were found with contaminants. Interpretation This study extends the existing empirical evidence linking PCSE to behavioral problems in school-aged children by reporting these effects in a population where tobacco use is normative rather than marginal. Co-exposure to Pb and Hg do not appear to exacerbate tobacco effects, suggesting that these substances act independently. PMID:23916943

  6. Environmental monitoring plan, July 1--December 31, 1994

    SciTech Connect

    Not Available

    1994-07-01

    The Tennessee Department of Environment and Conservation, DOE Oversight Division (TDEC/DOE-O) under the terms of the Tennessee Oversight Agreement (TOA) are providing annual reports: reporting of State`s monitoring and analysis, and findings of DOE`s quality and effectiveness of DOE`s monitoring and surveillance. This report blends some of both of the required annual reports as described in the TOA section A.7.2.2. The Federal Facilities Agreement (FFA) integrates the Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for the Oak Ridge Reservation. This report presents the results of environmental monitoring in Tennessee in the following areas: surface waters; ground water; air; and fish and wildlife. In addition, radiation monitoring has been conducted in all of these areas.

  7. Field environmental evaluation plan for sulfur use in pavements

    NASA Astrophysics Data System (ADS)

    Saylak, D.; Deuel, L. E.; Izatt, J. O.; Jacobs, C.; Zahray, R.; Ham, S.

    1982-07-01

    The use of sulfur in highway paving mixtures is discussed. The evaluation procedures deal with the safety and environmental aspects of storage and handling, formulation, construction, operation and maintenance of highway pavements containing sulfur, including the possible generation of noxious and abnoxious fumes, dust and gases. Methods and equipment for monitoring potential emissions and pollutants are recommended and safety practices for the handling of sulfur and sulfur-modified asphalt mixtures and pavements are discussed.

  8. Exxon Valdez oil spill restoration plan. Final environmental impact statement

    SciTech Connect

    1994-09-01

    The purpose of the proposed action analyzed in this final environmental impact statement (FEIS) is to restore, insofar as possible, the injured natural resources and thereby the services they provide that were affected by the Exxon Valdex oil spill (EVOS). The purpose of this document is to analyze the effects of proposed uses of the remaining funds (approximately $620 million as of February 1994, after final reimbursements) in accomplishing the mission of the Trustee Council.

  9. 78 FR 25134 - Termination of the Preparation of an Air Tour Management Plan and Environmental Assessment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... Federal Aviation Administration Termination of the Preparation of an Air Tour Management Plan and.... ACTION: Notice of Termination of the Preparation of Air Tour Management Plan and Environmental Assessment...), announces that it will no longer prepare an Air Tour Management Plan (ATMP) and Environmental Assessment...

  10. Potential for use of environmental factors in urban planning

    NASA Astrophysics Data System (ADS)

    Teixeira da Silva, Ricardo; van der Ploeg, Martine; van Delden, Hedwig; Fleskens, Luuk

    2016-04-01

    Projections for population growth estimate, on top of the current 7.4 billion world population, an increase of 2 billion people for the next 40 years. It is also projected that 66 per cent of the world population in 2050 will live in urban areas. To accommodate the urban population growth cities are changing continuously land cover to urban areas. Such changes are a threat for natural resources and food production systems stability and capability to provide food and other functions. However, little has been done concerning a rational soil management for food production in urban and peri-urban areas. This study focuses on the assessment of soil lost due to urban expansion and discusses the potential loss regarding the quality of the soil for food production and environmental functions. It is relevant to increase the knowledge on the role of soils in peri-urban areas and in the interaction of physical, environmental and social factors. The methodology consists of assessing the soil quality in and around urban and peri-urban areas. It focuses particularly on the physical properties and the environmental factors, for two periods of time and account the potential losses due to urban expansion. This project is on-going, therefore current advances will be presented and will look for a discussion on the contribution of soil quality for decision-making and land management in urban and peri-urban areas.

  11. Final Report: Research Study on Development of Environmental Friendly Spray-on Foam Insulation (SOFI) for the External Tank (ET)

    NASA Technical Reports Server (NTRS)

    Stuckey, James M.

    1996-01-01

    The selection and quantification of four foams using a more environmentally friendly HCFC-141b blowing agent replacing foams that used the CFC-11 blowing agent for the external tank (ET) LWT has been addressed along with problems and solutions that were encountered during verification. The effort on two lower density spray foams for the ET SLWT are presented, but predicted weight savings were not encouraging. Suggestions for possible problem solving are included along with a new approach for selecting foams for qualification as back-up foams for the foams used on the ET LWT. We investigated three resins for use as thermally sprayed coatings for corrosion prevention on metal. The best coating was obtained with a thermoplastic polyimide resin. This coating has a good chance of meeting ET requirements. Possible third generation blowing agents have been shown usable in polyurethane spray and pour foams, and solubility in isocyannate foam components are acceptable. We considered aerogels as insulation materials on space vehicles, and suggested a liner for a liquid oxygen (LOX) composite tank.

  12. Sandia National Laboratories, California Quality Assurance Project Plan for Environmental Monitoring Program.

    SciTech Connect

    Holland, Robert C.

    2005-09-01

    This Quality Assurance Project Plan (QAPP) applies to the Environmental Monitoring Program at the Sandia National Laboratories/California. This QAPP follows DOE Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance (DOE G 414.1-2A June 17, 2005). The Environmental Monitoring Program is located within the Environmental Operations Department. The Environmental Operations Department is responsible for ensuring that SNL/CA operations have minimal impact on the environment. The Department provides guidance to line organizations to help them comply with applicable environmental regulations and DOE orders. To fulfill its mission, the department has groups responsible for waste management; pollution prevention, air quality; environmental planning; hazardous materials management; and environmental monitoring. The Environmental Monitoring Program is responsible for ensuring that SNL/CA complies with all Federal, State, and local regulations and with DOE orders regarding the quality of wastewater and stormwater discharges. The Program monitors these discharges both visually and through effluent sampling. The Program ensures that activities at the SNL/CA site do not negatively impact the quality of surface waters in the vicinity, or those of the San Francisco Bay. The Program verifies that wastewater and stormwater discharges are in compliance with established standards and requirements. The Program is also responsible for compliance with groundwater monitoring, and underground and above ground storage tanks regulatory compliance. The Program prepares numerous reports, plans, permit applications, and other documents that demonstrate compliance.

  13. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    SciTech Connect

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  14. The role of web-based environmental information in urban planning--the environmental information system for planners.

    PubMed

    Culshaw, M G; Nathanail, C P; Leeks, G J L; Alker, S; Bridge, D; Duffy, T; Fowler, D; Packman, J C; Swetnam, R; Wadsworth, R; Wyatt, B

    2006-05-01

    The Environmental Information System for Planners (EISP) is a proof of concept web-based system designed to support decision making within the UK planning framework by making information on environmental issues more widely accessible. It incorporates relevant outputs from the Natural Environment Research Council (NERC) Urban Regeneration and the Environment (URGENT) research programme and from research directly commissioned by the Office of the Deputy Prime Minister (ODPM). It supports three principal planning functions carried out by local authorities: pre-planning enquiries, development control decisions and strategic planning. Eleven environmental science themes are incorporated: Air quality, Shallow undermining, Landslide susceptibility, Groundwater protection, Flood risk, Drainage, Land contamination, Proximity to landfill, Biodiversity, Natural and Man-made heritage. Decision flow diagrams represent detailed analysis of workflow in each theme, taking account of best practice, regulatory responsibilities and planning guidance. Industry-standard web technologies integrate the flows and provide access to the system via secure web pages. Underpinning the system is an environmental geographical information system (GIS) containing up-to-date data, information and models relevant to each theme. The modular system design allows new legislation and local priorities and datasets to be easily incorporated. Web technology delivers information and research data that have hitherto been difficult for the non-specialist to access and have therefore been under-exploited. The study has demonstrated a successful application of the principles of e-Governance in an area where informed decisions commonly require specialist information. The system, if rolled out nationally, offers potential economic benefits and efficiency savings for both planners and developers.

  15. The role of web-based environmental information in urban planning--the environmental information system for planners.

    PubMed

    Culshaw, M G; Nathanail, C P; Leeks, G J L; Alker, S; Bridge, D; Duffy, T; Fowler, D; Packman, J C; Swetnam, R; Wadsworth, R; Wyatt, B

    2006-05-01

    The Environmental Information System for Planners (EISP) is a proof of concept web-based system designed to support decision making within the UK planning framework by making information on environmental issues more widely accessible. It incorporates relevant outputs from the Natural Environment Research Council (NERC) Urban Regeneration and the Environment (URGENT) research programme and from research directly commissioned by the Office of the Deputy Prime Minister (ODPM). It supports three principal planning functions carried out by local authorities: pre-planning enquiries, development control decisions and strategic planning. Eleven environmental science themes are incorporated: Air quality, Shallow undermining, Landslide susceptibility, Groundwater protection, Flood risk, Drainage, Land contamination, Proximity to landfill, Biodiversity, Natural and Man-made heritage. Decision flow diagrams represent detailed analysis of workflow in each theme, taking account of best practice, regulatory responsibilities and planning guidance. Industry-standard web technologies integrate the flows and provide access to the system via secure web pages. Underpinning the system is an environmental geographical information system (GIS) containing up-to-date data, information and models relevant to each theme. The modular system design allows new legislation and local priorities and datasets to be easily incorporated. Web technology delivers information and research data that have hitherto been difficult for the non-specialist to access and have therefore been under-exploited. The study has demonstrated a successful application of the principles of e-Governance in an area where informed decisions commonly require specialist information. The system, if rolled out nationally, offers potential economic benefits and efficiency savings for both planners and developers. PMID:16242758

  16. A Work Force for Environment and Energy. A Master Plan for Environmental/Energy Higher Education in Illinois.

    ERIC Educational Resources Information Center

    Illinois Inst. for Environmental Quality, Chicago.

    This master plan for environmental and energy higher education in Illinois is a direct result of a mandate from the Illinois General Assembly. To prepare students to confront our nation's environmental problems, each university will submit a management and development plan, designed to preserve existing environmental values and provide…

  17. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    SciTech Connect

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act.

  18. Site Study Plan for background environmental radioactivity, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    SciTech Connect

    Not Available

    1987-06-01

    The Background Environmental Radioactivity Site Study Plan describes a field program consisting of an initial radiological survey and a radiological sampling program. The field program includes measurement of direct radiation and collection and analysis of background radioactivity samples of air, precipitation, soil, water, milk, pasture grass, food crops, meat, poultry, game, and eggs. The plan describes for each study: the need for the study, the study design, data management and use, schedule of proposed activities, and quality assurance requirements. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project (SRP) Requirements Document. 50 refs., 11 figs., 7 tabs.

  19. Requirements, guidance and logic in planning environmental investigations: Approval versus implementation

    SciTech Connect

    Brice, D.A.

    1993-09-09

    In today`s litigious society, it is important for both private parties and government to plan and conduct environmental investigations in a scientifically sound manner, documenting the purpose, methods, and results in a consistent fashion throughout the exercise. Planning documents are prepared during the initial phases of environmental investigations. Project objectives, including data quality requirements, specific work to be conducted to fulfill data needs, and operating procedures are specified. Regulatory agency approval of these documents is often required prior to plan implementation. These approvals are necessary and appropriate to fulfilling the agency`s mandated role. Many guidance documents prepared by regulatory agencies suggest the content and format of various scoping documents. These guidances help standardize thought processes and considerations in planning, and provide a template to ensure that both the plan and the proposed work will fulfill regulatory requirements. This work describes the preparation and use of guidance documents for planning environmental studies. The goals and some of the pitfalls of such documents are discussed. Guidance should include the following elements: the purpose of the guidance and a description of where it applies; the type of items to be addressed in planning; identification of requirements are applicable to all projects for which the guidance is intended; identification of requirements only applicable in certain situations; a description of items to facilitate planning; a suggested format for fulfilling requirements; example applications of the guidance. Disagreements arise between planners and reviewers/approvers when elements of guidance are used as leverage to require work not directly related to project objectives. Guidance may be inappropriately used as a milestone by which site-specific plans are judged. Regulatory agency review and approval may be regarded as a primary objective of the plan.

  20. Environmental Compliance Plan for the Y-12 Central Mercury Treatment System project

    SciTech Connect

    McComb, S.T.

    1995-09-01

    This Environmental compliance Plan is specific to the construction phase of the installation of the Central Mercury Treatment System (CMTS) at the Oak Ridge Y-12 Plant. This document was prepared under Work Breakdown Structure 1.4.12.1.1.03.44 (Activity Data Sheet ER 2303, ``Central Mercury Treatment System``). It was prepared to support the Lockheed Martin Energy Systems, Inc. (Energy Systems), Reduction of Mercury in Plant Effluent (RMPE) program. The purpose of this project Environmental Compliance Plan is to elaborate upon the compliance requirements outlined by the project plan; define the roles, responsibilities, and relationships needed to effectively implement requirements; define envirorunental compliance oversight activities; and establish environmental compliance record keeping and reporting requirements.

  1. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    SciTech Connect

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP`s disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II.

  2. Environmental Risks to Public Health in the United Arab Emirates: A Quantitative Assessment and Strategic Plan

    PubMed Central

    Farah, Zeinab S.

    2012-01-01

    Background: Environmental risks to health in the United Arab Emirates (UAE) have shifted rapidly from infectious to noninfectious diseases as the nation has developed at an unprecedented rate. In response to public concerns over newly emerging environmental risks, the Environment Agency–Abu Dhabi commissioned a multidisciplinary environmental health strategic planning project. Objectives: In order to develop the environmental health strategic plan, we sought to quantify the illnesses and premature deaths in the UAE attributable to 14 environmental pollutant categories, prioritize these 14 risk factors, and identify interventions. Methods: We estimated the disease burden imposed by each risk factor using an attributable fraction approach, and we prioritized the risks using an empirically tested stakeholder engagement process. We then engaged government personnel, scientists, and other stakeholders to identify interventions. Results: The UAE’s environmental disease burden is low by global standards. Ambient air pollution is the leading contributor to premature mortality [~ 650 annual deaths; 95% confidence interval (CI): 140, 1,400]. Risk factors leading to > 10,000 annual health care facility visits included occupational exposures, indoor air pollution, drinking water contamination, seafood contamination, and ambient air pollution. Among the 14 risks considered, on average, outdoor air pollution was ranked by the stakeholders as the highest priority (mean rank, 1.4; interquartile range, 1–2) and indoor air pollution as the second-highest priority (mean rank 3.3; interquartile range, 2–4). The resulting strategic plan identified 216 potential interventions for reducing environmental risks to health. Conclusions: The strategic planning exercise described here provides a framework for systematically deciding how to invest public funds to maximize expected returns in environmental health, where returns are measured in terms of reductions in a population

  3. Strategic environmental assessment and national development plans in Turkey: Towards legal framework and operational procedure

    SciTech Connect

    Say, Nuriye Peker . E-mail: nursay@cu.edu.tr; Yuecel, Muzaffer

    2006-04-15

    National development plans were started to be prepared in Turkey in 1963. These plans are mandatory for public investments and guiding principles for private investments. They have a quality which guides and sets objectives for other plans in the country. Therefore, they can be evaluated as the main reason of successes and failures of sectoral investments or the problems that they cause directly or indirectly. Turkey is undergoing rapid industrialization, urbanization and population growth, thus environmental problems are on the increase. Although Environmental Impact Assessment (EIA) has been applied to individual investments in Turkey since 1993, natural environment has continued to be affected because of human activities. Today, parallel to the developments in the world, it has been discussed that it is necessary to strengthen project-level Environmental Assessment (EA) and to practice Strategic Environmental Assessment (SEA). The interest in SEA, that is, EA at the level of proposed policies, plans and programs has grown significantly since 2000 in the country. Discussions and preparations have started about regulation which provides the legal and institutional framework for SEA in The Ministry of Environment and Forestry. However, since the scientific approach into the subject is very new in Turkey, it will take time to answer the questions about how and in what fields to practice. This research project aims at analyzing the possible practice opportunities of SEA in Turkey and the practicability of SEA into the National Five-Year Development Plan (FYDP) which is assumed at the highest level of planning hierarchy in the country. The research is conducted on two sections. In the first section, procedural approaches to SEA on national development plans are investigated and a framework for these approaches is adapted at the institutional level. In the second section, SEA form for energy sector in the development plans is developed. In this article, the findings

  4. Ocean thermal energy conversion: environmental effects assessment program plan, 1981-85. [Monograph

    SciTech Connect

    Not Available

    1982-01-01

    The Ocean Thermal Energy Conversion (OTEC) Act of 1980 calls for a legal regime to encourage commercial OTEC while protecting the oceanic and coastal environments. The Act also requires a generic plan for assessing the environmental effects of OTEC development. The plan outlined in this report establishes a priority list of nine environmental effects and a research strategy for reducing uncertainties, with an emphasis on large-scale and long-term ecosystem implications and on the impacts of multiple facilities. 70 references, 4 figures, 4 tables. (DCK)

  5. Final Action Plan to Tiger Team. Environmental, safety and health assessment

    SciTech Connect

    Not Available

    1992-02-28

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit.

  6. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993

    SciTech Connect

    Not Available

    1993-01-15

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

  7. A state-impact-state methodology for assessing environmental impact in land use planning

    SciTech Connect

    Chen, Longgao; Yang, Xiaoyan; Chen, Longqian; Potter, Rebecca; Li, Yingkui

    2014-04-01

    The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: • A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). • Matter-element (ME) and Extenics methods were embedded in the LUPEA. • The model was applied to the LUPEA of Zoucheng County. • The assessment shows improving environment quality since 2000 in Zoucheng County. • The method provides a useful tool for the LUPEA in the county level.

  8. Environmental Monitoring and Assessment Program: Surface waters implementation plan - Northeast Pilot Lake Survey, Summer 1991

    SciTech Connect

    Pollard, J.E.; Perez, K.M.

    1991-06-01

    The document outlines the proposed implementation plan for the Environmental Monitoring and Assessment Program's Surface Waters Northeast Lakes Pilot Survey, to be conducted from July through September, 1991. The plan outlines the objectives of the field pilot activities and the questions which the authors expect to answer as a result of these activities. In addition, the plan contains a description of the indicators, the measurement variables included in each indicator, the design rationale, and details including site selection criteria and a list of selected sites. Very brief descriptions of quality assurance, logistical considerations, and the information management approach are also presented.

  9. Environmental and developmental effects on external gill loss in the red-eyed tree frog, Agalychnis callidryas.

    PubMed

    Warkentin, K M

    2000-01-01

    I examined the effects of development, hatching, and oxygen availability on external gill loss in red-eyed tree frogs, Agalychnis callidryas. Under natural conditions, the arboreal embryos maintained large external gills until hatching, which occurred from 5-8 d after oviposition. At hatching, when tadpoles entered the water, external gills began to regress. In older hatchlings this process was extremely rapid. Gill circulation was lost on average within 16 min and sometimes within 5 min. Gills often regressed completely in under 2 h. Younger hatchlings reduced gill circulation, shortened and adducted their gills, then resumed normal circulation for some time after hatching; half had completely lost external gills within 24 h. Experimentally increasing the area of egg surface exposed to the air induced loss of external gills in unhatched embryos. Older hatchlings in hypoxic water without access to air maintained their external gills. This suggests that loss of external gills is a response to increased oxygen availability, rather than a response to hatching per se. Extended maintenance of external gills by large, late-hatching embryos may facilitate continued rapid development in closely packed eggs. PMID:11073790

  10. Integrated capacity planning for electricity generation: A fuzzy environmental policy analysis approach

    SciTech Connect

    Nasiri, F.; Huang, G.

    2008-07-01

    This study proposes an integrated model for capacity planning in electricity generation. It utilizes a multiple-criteria linear programming to incorporate cost and environmental objectives into the planning. To treat the uncertainties embedded in definition of model parameters, the concept of decision-maker degree of optimism will be used. Optimization of the model provides different planning scenarios. To determine the best compromise plan, a post-optimization assessment based on fuzzy set theory concepts is developed. The proposed methodology is employed for a medium-term capacity planning in Canada's electricity generation sector. The results approve a major capacity growth for natural gas facilities accompanied by retirement of most coal-burning facilities.

  11. Environmental impact reduction through ecological planning at Bahia Magdalena, Mexico.

    PubMed

    Malagrino, Giovanni; Lagunas, Magdalena; Rubio, Alfredo Ortega

    2008-03-01

    For analyzing basic marine and coastal characteristics we selected the potential sites where shrimp culture could be developed in a large coastal zone, Bahia Magdalena, Baja California Sur, Mexico. Based on our analysis, 6 sites were preselected and field stages of work were then developed to assess the precise suitability of each site in order to develop the proposed aquaculture activities. In ranking the suitability we were able to recommend the most appropriate places to develop shrimp culture in this region. Also, knowing the exact biological, physico-chemical and social environment, we determined the best species to cultivate, the recommended total area and the methodology to be used to lessen the environmental impact and to obtain the maximum profitability Our methodology could be used not only to select appropriate sites for shrimp culture in other coastal lagoons, but it also could be applied to assess the suitability in a quick and accurate way, of any other production activity in coastal zones. PMID:18831370

  12. Environmental planning as a tool for economic development: The black brook watershed experience

    SciTech Connect

    Ryner, P.C.; Heller, G.B.

    1995-12-01

    The Keene, New Hampshire Planning Department has attempted to use environmental planning as a tool to facilitate industrial development of the Black Brook Watershed. The City has established detailed modeling of drainage, floodplains and groundwater, and has placed that information on accurate computer-based maps. When provided to developers at the beginning of the development process, this environmental information expidites design and permitting while also improving the likelihood of protecting sensitive environmental areas. Starting in 1987 as part of a Master Plan revision process, the Planning Department decided to concentrate on the Black Brook Watershed in northwestern Keene as a target area for a new approach to economic development and environmental protection. The entire watershed was chosen as the boundary for this study area and detailed studies were conducted. During this effort the City formulated a new Economic Development Master Plan which called for the creation of approximately 300 acres of new industrial development within the next ten years. The Black Brook basin was identified as the preferred site. Because of pro-active environmental planning, the City is now able to work in active, cooperative partnership with the private sector in the development of this area. It is clear from this first specific development project that the project development and permitting process will be shortened by at least 60 days, and a minimum of $5,000 to $10,000 in preliminary site information costs will be saved. The availability of good information on wetlands and floodplains has already had a dramatic impact upon proposed site design and has achieved the desired objective of avoiding these sensitive areas whenever possible. The City is now working on the design of an Industrial Design and Permitting System which will be applied to the entire City, based upon what has been learned from this effort.

  13. Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory. Environmental Restoration Program

    SciTech Connect

    Clark, C. Jr.

    1993-07-01

    A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D&D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities.

  14. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    SciTech Connect

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  15. Management Research Center Report To The External Degree Planning Consortium Of The Policy Institute, SURC On Identification Of Learning Materials.

    ERIC Educational Resources Information Center

    Fisk, George; Nehmadi, David

    A system has been developed to identify, locate and evaluate learning materials for use in an external degree program in management at Syracuse University. It consists of five elements, each of which is a set of physical objects or documents: the interaction of these sets transforms the demand for learning materials into an output of retrieved…

  16. ORNL long-range environmental and waste management plan: Program overview and summary

    SciTech Connect

    Bates, L.D.; Berry, J.B.; Butterworth, G.E.; du Mont, S.P.; Easterday, C.A.; Geisler, A.H.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Pudelek, R.E.; Rohwer, P.S.; Scanlan, T.F.; Stratton, L.E.; Trabalka, J.R.; Youngblood, E.L.

    1988-04-01

    The primary purpose of this report is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The docuemnt also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document: it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) Management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. The near-term (one to three years) part of the plan is a realistic assessment of the current program and ongoing capital projects and reflects the efforts preceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. Beyond the immediate time frame, the document reflects the strategy and the project and funding estimates as a snapshot at the time of publication. Annual revision will reflect the continuing evoltuion and development of environmental and waste management processes, characterizations, remedial actions, regulations, an strategies for the establishment and conduct of a comprehensive environmental and waste management program. 15 figs., 10 tabs.

  17. Project W-521 waste feed delivery systems environmental permits and approvals plan

    SciTech Connect

    TOLLEFSON, K.S.

    1999-09-21

    This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities.

  18. 77 FR 51554 - Draft Environmental Impact Statement and Habitat Conservation Plan; Receipt of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... to bats when they are active at low wind speeds by raising turbine cut-in speeds (the wind speed at... bats by fully feathering turbine blades so that they barely move at wind speeds below the cut-in speed... Fish and Wildlife Service Draft Environmental Impact Statement and Habitat Conservation Plan;...

  19. 78 FR 23586 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... project consists of a 100-turbine wind-powered electric generation facility located in an approximately 80... Fish and Wildlife Service Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement and Draft Programmatic Agreement, Buckeye Wind Power Project, Champaign County,...

  20. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Intent published in the Federal Register (71 FR 30446). A Notice of Availability of the Draft RMP/Draft... Bureau of Land Management Notice of Availability of the Proposed Resource Management Plan and Final.... ACTION: Notice of availability. SUMMARY: In accordance with the National Environmental Policy Act...

  1. 77 FR 11154 - Notice of Availability for the Eastern Interior Draft Resource Management Plan/Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ..., subsistence, travel management, water quality, lands with wilderness characteristics, and wildlife. The Draft... Bureau of Land Management Notice of Availability for the Eastern Interior Draft Resource Management Plan/Environmental Impact Statement, Alaska AGENCY: Bureau of Land Management, Interior. ACTION: Notice...

  2. 77 FR 42756 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Incidental Take of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Texas troglobitic water slater (Lirceolus smithii) in case they are listed during the duration of the..., and the Edwards Aquifer Authority; San Antonio Water Systems; City of New Braunfels, Texas; City of... Fish and Wildlife Service Draft Environmental Impact Statement and Draft Habitat Conservation Plan...

  3. 78 FR 73559 - Moose-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ... National Park Service Moose-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement... the Moose-Wilson Corridor, Grand Teton National Park, Wyoming. DATES: The National Park Service will...://parkplanning.nps.gov/MooseWilson , at the Grand Teton National Park Headquarters Building, 1 Teton Park...

  4. 77 FR 30320 - General Management Plan/Environmental Impact Statement, Ross Lake National Recreation Area, North...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... National Park Service General Management Plan/Environmental Impact Statement, Ross Lake National Recreation Area, North Cascades National Park Service Complex, Skagit and Whatcom Counties, WA AGENCY: National... Department of the Interior, National Park Service (NPS) has prepared and approved a Record of Decision...

  5. 75 FR 47826 - Final General Management Plan/Environmental Impact Statement, Cumberland Gap National Historical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... National Park Service Final General Management Plan/Environmental Impact Statement, Cumberland Gap National Historical Park, Kentucky, Tennessee and Virginia AGENCY: National Park Service, Department of the Interior... Policy Act of 1969 the National Park Service (NPS) announces the availability of a Final...

  6. 76 FR 23623 - Backcountry Management Plan, Environmental Impact Statement, Grand Canyon National Park, Arizona

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... protection of wilderness character. The National Park Service will identify additional issues to be addressed... National Park Service Backcountry Management Plan, Environmental Impact Statement, Grand Canyon National Park, Arizona AGENCY: National Park Service, Department of the Interior. ACTION: Notice of Intent...

  7. 77 FR 43808 - Supplement to the Draft Programmatic Restoration Plan and Programmatic Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... previous draft RP/PEIS was made available for public review on May 22, 2009 (74 FR 25735, pages 25735-5736... Restoration Plan and Programmatic Environmental Impact Statement AGENCY: National Marine Fisheries Service... case. The Trustee Council is providing notice that the Supplement to the Draft Programmatic...

  8. 78 FR 45265 - Notice of Intent To Prepare a Resource Management Plan Amendment and Associated Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan Amendment and Associated Environmental Assessment for Coal Lease by Application ALES-55199, AL AGENCY: Bureau of Land Management, Interior. ACTION: Notice. SUMMARY: The Bureau of Land Management (BLM) is preparing a Resource...

  9. 36 CFR 223.40 - Cancellation for environmental protection or inconsistency with plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts Contract Conditions and Provisions § 223.40 Cancellation for environmental protection or inconsistency with plans. Timber sale...

  10. 36 CFR 223.30 - Consistency with plans, environmental standards, and other management requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Consistency with plans, environmental standards, and other management requirements. 223.30 Section 223.30 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM...

  11. 36 CFR 223.30 - Consistency with plans, environmental standards, and other management requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Consistency with plans, environmental standards, and other management requirements. 223.30 Section 223.30 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM...

  12. 36 CFR 223.30 - Consistency with plans, environmental standards, and other management requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Consistency with plans, environmental standards, and other management requirements. 223.30 Section 223.30 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM...

  13. 36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Consistency with plans, environmental standards, and other management requirements. 223.218 Section 223.218 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM...

  14. 36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Consistency with plans, environmental standards, and other management requirements. 223.218 Section 223.218 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM...

  15. 36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Consistency with plans, environmental standards, and other management requirements. 223.218 Section 223.218 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM...

  16. 36 CFR 223.218 - Consistency with plans, environmental standards, and other management requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Consistency with plans, environmental standards, and other management requirements. 223.218 Section 223.218 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM...

  17. 78 FR 44592 - Final General Management Plan, Final Wilderness Study, and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... Environmental Impact Statement for the General Management Plan and Wilderness Study (Final EIS/GMP/WS) for Fort... policies and the purpose of the national monument, the Final EIS/GMP/WS will guide the management of the... the Final EIS/GMP/WS in the Federal Register. ADDRESSES: Electronic copies of the Final...

  18. 76 FR 62089 - General Management Plan/Abbreviated Final Environmental Impact Statement, New River Gorge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... Abbreviated Final Environmental Impact Statement for the General Management Plan (GMP/EIS) for New River Gorge... GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets detailing editorial corrections to the Draft GMP/EIS, and copies of agency...

  19. Background, Personal, and Environmental Influences on the Career Planning of Adolescent Girls

    ERIC Educational Resources Information Center

    Novakovic, Alexandra; Fouad, Nadya A.

    2013-01-01

    This study investigated the influence of background variables (age, race/ethnicity, mother's work status outside of the home, and socioeconomic status), personal variables (anticipatory role conflict and academic self-efficacy), and environmental variables (parental attachment and parental support) on aspects of adolescent girls' career planning.…

  20. Ontology Driven Analysis of Spatio-temporal Phenomena, Aimed At Spatial Planning And Environmental Forecasting

    NASA Astrophysics Data System (ADS)

    Iwaniak, A.; Łukowicz, J.; Strzelecki, M.; Kaczmarek, I.

    2013-10-01

    Spatial planning is a crucial area for balancing civilization development with environmental protection. Spatial planning has a multidisciplinary nature. It must take into account the dynamics of the processes, which could affect the integrity of the environmental system. That is why we need a new approach to modelling phenomena occurring in space. Such approach is offered by ontologies, based on Description Logic (DL) and related to inference systems. Ontology is a system for the knowledge representation, including conceptual scheme and based on this scheme representation of reality. Ontologies can be enriched with additional logical systems. The authors present a way of building domain ontologies for spatial planning, including the representation of spatio-temporal phenomena. Description Logic is supplemented by structures of temporal logic. As a result, the analysis for exploring the topological relations between spatial objects will be extended to include temporal relationships: coincidence, precedence and succession, cause and effect relationship. Spatio-temporal models with temporal logic structures, encoded in ontologies, could be a subject of inference process, performed by semantic reasoners (reasoner engines). Spatio-temporal representations are offered, by so-called upper ontologies, such as GFO, BFO, OCHRE and others. Temporal structures provided in such ontologies, are useful for the analysis of data obtained from environmental and development monitoring systems and for description and representation of historical phenomena. They allow creating the models and scenarios of expected spatial transformation. They will support analysis for spatial development design, decision-making in spatial planning and forecasting of environmental impact.

  1. Uncertainty and Sensitivity Analyses Plan. Draft for Peer Review: Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Simpson, J.C.; Ramsdell, J.V. Jr.

    1993-04-01

    Hanford Environmental Dose Reconstruction (HEDR) Project staff are developing mathematical models to be used to estimate the radiation dose that individuals may have received as a result of emissions since 1944 from the US Department of Energy`s (DOE) Hanford Site near Richland, Washington. An uncertainty and sensitivity analyses plan is essential to understand and interpret the predictions from these mathematical models. This is especially true in the case of the HEDR models where the values of many parameters are unknown. This plan gives a thorough documentation of the uncertainty and hierarchical sensitivity analysis methods recommended for use on all HEDR mathematical models. The documentation includes both technical definitions and examples. In addition, an extensive demonstration of the uncertainty and sensitivity analysis process is provided using actual results from the Hanford Environmental Dose Reconstruction Integrated Codes (HEDRIC). This demonstration shows how the approaches used in the recommended plan can be adapted for all dose predictions in the HEDR Project.

  2. Environmental vulnerability indicators for environmental planning and decision-making: guidelines and applications.

    PubMed

    Villa, Ferdinando; McLeod, Helena

    2002-03-01

    Environmental decision-making and policy-making at all levels refers necessarily to synthetic, approximate quantification of environmental properties such as vulnerability, conservation status, and ability to recover after perturbation. Knowledge of such properties is essential to informed decision-making, but their definition is controversial and their precise characterization requires investments in research, modeling, and data collection that are only possible in the most developed countries. Environmental agencies and governments worldwide have increasingly requested numerical quantification or semiquantitative ranking of such attributes at the ecosystem, landscape, and country level. We do not have a theory to guide their calculation, in general or specific contexts, particularly with the amount of resources usually available in such cases. As a result, these measures are often calculated with little scientific justification and high subjectivity, and such doubtful approximations are used for critical decision-making. This problem applies particularly to countries with weak economies, such as small island states, where the most precious environmental resources are often concentrated. This paper discusses frameworks for a "least disappointing," approximate quantification of environmental vulnerability. After a review of recent research and recent attempts to quantify environmental vulnerability, we discuss models and theoretical frameworks for obtaining an approximate, standardizable vulnerability indicator of minimal subjectivity and maximum generality. We also discuss issues of empirical testing and comparability between indicators developed for different environments. To assess the state of the art, we describe an independent ongoing project developed in the South Pacific area and aimed to the comparative evaluation of the vulnerability of arbitrary countries. PMID:11830764

  3. Environmental Regulatory Compliance Plan for Site Characterization; Yucca Mountain Site, Nevada Research and Development Area, Nevada: Revision 1

    SciTech Connect

    1988-12-01

    The DOE is committed to conduct its operations in an environmentally safe and sound manner, and will comply with applicable environmental statutes and regulations. These objectives are described in DOE Order 5400.1 (Environmental Protection Program Requirements). This document -- the Environmental Regulatory Compliance Plan (ERCP) -- is one method of implementing the policy set forth in DOE Order 5400.1 and the NWPA. The ERCP describes the plan by which the DOE will comply with applicable Federal environmental statutes and regulations. The ERCP also discusses how DOE will address State and local environmental statutes and regulations. 180 refs., 27 figs., 1 tab.

  4. 78 FR 43226 - Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement, Glacier National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ... National Park Service Going-to-the-Sun Road Corridor Management Plan, Environmental Impact Statement... Environmental Impact Statement for the Going-to-the-Sun Road Corridor Management Plan for Glacier National Park...-to-the Sun Road (GTSR) corridor. DATES: The National Park Service will accept comments from...

  5. 77 FR 54922 - Record of Decision for the General Management Plan/Final Environmental Impact Statement, Hampton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ... National Park Service Record of Decision for the General Management Plan/Final Environmental Impact... Region signed the Record of Decision selecting Alternative 3 as the approved General Management Plan (GMP... measures to minimize environmental harm, and an overview of public involvement in the...

  6. Streamlined approach for environmental restoration plan for corrective action unit 416, Mud Pit, Project Shoal Area

    SciTech Connect

    1997-07-01

    This plan addresses the actions necessary for the restoration and closure of the Project Shoal Area (PSA), Surface Corrective Action Unit (CAU) 416, Mud Pit (Corrective Action Site No. 57-09-01), a pit that was used to store effluent produced during drilling of the Post-Shot Borehole PS-1 in 1963. This plan describes the activities that will occur at the site and the steps that will be taken to gather enough data to obtain a notice of completion from the Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented with the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and the Industrial Sites Quality Assurance Project Plan (DOE/NV, 1994). The SAFER process is being employed at this CAU where enough information exists about the nature and extent of contamination to propose an appropriate corrective action without completing a Corrective Action Decision Document and Corrective Action Plan. This process combines elements of the Data Quality Objective (DQO) process and the observational approach to help plan and conduct corrective actions. DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the process. This has already been completed for the mud pit so it will not be repeated here. The DQOs for the mud pit are presented in the Corrective Action Investigation Plan for Project Shoal Area, CAU No. 416 (DOE/NV, 1996). This observational approach provides a framework for managing uncertainty and planning decision making.

  7. Environmental management 1994. Progress and plans of the environmental restoration and waste management program

    SciTech Connect

    Not Available

    1994-02-01

    The Department of Energy currently faces one of the largest environmental challenges in the world. The Department`s Environmental Restoration and Waste Management program is responsible for identifying and reducing risks and managing waste at 137 sites in 34 States and territories where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. The number of sites continues to grow as facilities are transferred to be cleaned up and closed down. The program`s main challenge is to balance technical and financial realities with the public`s expectations and develop a strategy that enables the Department to meet its commitments to the American people. This document provides a closer look at what is being done around the country. Included are detailed discussions of the largest sites in the region, followed by site activities organized by state, and a summary of activities at FUSRAP and UMTRA sites in the region.

  8. Environmental Management 1995: Progress and plans of the Environmental Management Program

    SciTech Connect

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  9. 76 FR 70162 - Notice of Intent To Prepare an Environmental Assessment for a Possible Land Use Plan Amendment To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-10

    ... Bureau of Land Management Notice of Intent To Prepare an Environmental Assessment for a Possible Land Use.... ADDRESSES: Comments on issues and planning criteria related to the land use plan amendment should be... to address the sale. To the extent possible, this land use planning process will be integrated...

  10. 75 FR 79389 - Notice of Availability of the Record of Decision for the General Management Plan/Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... the decision-making process. The approved General Management Plan will guide long-term management of... National Park Service Notice of Availability of the Record of Decision for the General Management Plan... of Decision for the General Management Plan/Environmental Impact Statement (GMP/ EIS) for...

  11. Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan

    SciTech Connect

    Nielsen, T. ); Waage, E.; Miller, D. Corp., Boulder, CO )

    1990-01-01

    The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

  12. Strategic Environmental Assessment as catalyst of healthier spatial planning: The Danish guidance and practice

    SciTech Connect

    Kornov, Lone

    2009-01-15

    A wide range of factors within spatial planning can affect health. There is therefore an important scope for Strategic Environmental Assessment (SEA) of spatial plans to protect and improve human health. Due to the EU Directive 2001/42/EC on SEA, health has been made explicit in Danish legislation and guidance. This paper examines the inclusion of health as a formal component in impact assessment of spatial plans. Based upon a documentary study of 100 environmental reports, the paper analyses and discusses how health impact considerations are incorporated in SEA practice. It is found that health impacts are included in SEA practice and are being interpreted in a broader sense than what the national guidance exemplifies. The frequent included health aspects are noise, drinking water, air pollution, recreation/outdoor life and traffic safety. The primary determinant for health is transport-whether it is at the overall or local planning level. The main conclusion is that SEA shows a potential to catalyse healthier spatial planning. Despite the broad inclusion of health in SEA practice the examination shows potential improvements, hereunder qualification of assessments by better explaining the nature and significance of impacts and by including the distributional aspects of human health impacts. Inclusion from the health sector is put forward as an important institutional mean to secure cross disciplinarily and higher quality assessment.

  13. Software Development Plan for DESCARTES and CIDER. Hanford Environmental Dose Reconstruction Project: Version 1.0

    SciTech Connect

    Eslinger, P.W.

    1992-12-08

    This Software Development Plan (SDP) outlines all software activities required to obtain functional environmental accumulation and individual dose codes for the Hanford Environmental Dose Reconstruction (HEDR) project. The modeling activities addressed use the output of the air transport-code HATCHET to compute radionuclide concentrations in environmental pathways, and continue on through calculations of dose for individuals. The Hanford Environmental Dose Reconstruction (HEDR) Project has a deliverable in the June 1993 time frame to be able to start computing doses to individuals from nuclear-related activities on the Hanford Site during and following World War II. The CIDER code will compute doses and their uncertainties for individuals living in the contaminated environment computed by DESCARTES. The projected size of the code is 3000 lines.

  14. Tiering strategic environmental assessment and project environmental impact assessment in highway planning in Sao Paulo, Brazil

    SciTech Connect

    Sanchez, Luis E. Silva-Sanchez, Solange S.

    2008-10-15

    Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on 'what is strategic' is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval.

  15. Functional forest road network planning by consideration of environmental impact assessment for wood harvesting.

    PubMed

    Gumus, Selcuk; Acar, H Hulusi; Toksoy, Devlet

    2008-07-01

    Forest management today has to meet a number of objectives. Planning of multi-functional forest road networks is one essential for meeting the aims of the sustainable forest concept. Road construction damages the natural environment unless it is carefully thought out. As forest engineers we have to consider the protection of nature when designing forest roads. With this aim in mind, a new network planning approach was developed for wood-harvesting. A geographical information system (GIS) was used to evaluate the data and planning process. The new forest road network plan for Catak Forest District constituted the addition of a new 16-road segment, total length 59.067 km, to the existing road network plan, for the purpose of wood-harvesting operations. Forest road density value was determined as 22.8 m/ha: the opening-up rate of the area was increased to 77.8% and the opening-up rate of the existing stand value was increased to 94.3% after close examination. 90.2% of roads were planned for the forest areas where there is likely to be minimal negative environmental impact. PMID:17874200

  16. Functional forest road network planning by consideration of environmental impact assessment for wood harvesting.

    PubMed

    Gumus, Selcuk; Acar, H Hulusi; Toksoy, Devlet

    2008-07-01

    Forest management today has to meet a number of objectives. Planning of multi-functional forest road networks is one essential for meeting the aims of the sustainable forest concept. Road construction damages the natural environment unless it is carefully thought out. As forest engineers we have to consider the protection of nature when designing forest roads. With this aim in mind, a new network planning approach was developed for wood-harvesting. A geographical information system (GIS) was used to evaluate the data and planning process. The new forest road network plan for Catak Forest District constituted the addition of a new 16-road segment, total length 59.067 km, to the existing road network plan, for the purpose of wood-harvesting operations. Forest road density value was determined as 22.8 m/ha: the opening-up rate of the area was increased to 77.8% and the opening-up rate of the existing stand value was increased to 94.3% after close examination. 90.2% of roads were planned for the forest areas where there is likely to be minimal negative environmental impact.

  17. United States Department of Energy Richland Operations Office Environmental Protection Implementation Plan: November 9, 1993, to November 9, 1994

    SciTech Connect

    1993-11-01

    The hub of today`s programs at the Hanford Site are activities dedicated to managing stored and new wastes and cleanup of waste sites. To ensure focused planning and implementing efforts for these programs, management of the site is assigned to DOE`s Office of Environmental Restoration and Waste Management. This report describes policies and procedures in the following areas: Compliance activities; Environmental restoration; Waste management; and Technology development. Procedures for notification of environmental occurrences, long-range environmental protection planning and reporting, waste management programs; environmental monitoring programs, and quality assurance and data verification are also described and discussed.

  18. Environmental regulatory compliance plan, Deaf County site, Texas: Draft revision 1

    SciTech Connect

    Not Available

    1987-12-14

    The DOE is committed to conduct its operation in an environmentally safe and sound manner and comply with the letter and spirit of applicable environmental statues and regulations. These objectives are codified in DOE order N 5400.2, ''Environmental Policy Statement.'' This document, the Deaf Smith County site (Texas) Environmental Regulatory Compliance Plam (ERCP), is one means of implementing that policy. The ERCP describes the environmental regulatory requirements applicable to the Deaf Smith County site (Texas), and presented the framework within which the Salt Repository Project Office (SRPO) will comply with the requirements. The plan also discusses how DOE will address State and local environmental requirements. To achieve this purpose the ERCP will be developed in phases. This version of the ERCP is the first phase in the delopment of the ERCP. It represents the Salt Repository Project Office's understanding of environmental requirements for the site characterization phase of repository development. After consultation with the appropriate federal and state agencies and affected Indian tribes, the ERCP will be updated to reflect the results of consultation with these agencies and affected Indian tribes. 6 refs., 38 figs.

  19. An environmental pressure index proposal for urban development planning based on the analytic network process

    SciTech Connect

    Gomez-Navarro, Tomas; Diaz-Martin, Diego

    2009-09-15

    This paper introduces a new approach to prioritize urban planning projects according to their environmental pressure in an efficient and reliable way. It is based on the combination of three procedures: (i) the use of environmental pressure indicators, (ii) the aggregation of the indicators in an Environmental Pressure Index by means of the Analytic Network Process method (ANP) and (iii) the interpretation of the information obtained from the experts during the decision-making process. The method has been applied to a proposal for urban development of La Carlota airport in Caracas (Venezuela). There are three options which are currently under evaluation. They include a Health Club, a Residential Area and a Theme Park. After a selection process the experts chose the following environmental pressure indicators as ANP criteria for the project life cycle: used land area, population density, energy consumption, water consumption and waste generation. By using goal-oriented questionnaires designed by the authors, the experts determined the importance of the criteria, the relationships among criteria, and the relationships between the criteria and the urban development alternatives. The resulting data showed that water consumption is the most important environmental pressure factor, and the Theme Park project is by far the urban development alternative which exerts the least environmental pressure on the area. The participating experts coincided in appreciating the technique proposed in this paper is useful and, for ranking ordering these alternatives, an improvement from traditional techniques such as environmental impact studies, life-cycle analysis, etc.

  20. 75 FR 49926 - Sawgrass Storage LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... Energy Regulatory Commission Sawgrass Storage LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Sawgrass Storage Project and Request for Comments on Environmental Issues August 6... goal of the scoping process is to focus the analysis in the EA on the important environmental...

  1. State Environmental Policy Act (SEPA) Environmental Checklist Form 216-B-3 Expansion Ponds Closure Plan. Revision 1

    SciTech Connect

    Not Available

    1993-12-01

    The 216-B-3 Expansion Ponds Closure Plan (Revision 1) consists of a Part A Dangerous Waste Permit Application and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. The 216-B-3 Pond System consists of a series of four earthen, unlined, interconnected ponds and the 216-B-3-3 Ditch that receive waste water from various 200 East Area operating facilities. These four ponds, collectively. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the 216-B-3-3 Ditch. Water discharged to the 216-8-3-3 Ditch flows directly into the 216-B-3 Pond. In the past, waste water discharges to B Pond and the 216-B-3-3 Ditch contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the nonradioactive dangerous portion of mixed waste is regulated under RCRA. Mixed waste also may be considered a hazardous substance under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) when considering remediation of waste sites.

  2. One common way - The strategic and methodological influence on environmental planning across Europe

    SciTech Connect

    Jiricka, Alexandra; Proebstl, Ulrike

    2009-11-15

    In the last decades the European Union exerted influence on precautionary environmental planning by the establishment of several Directives. The most relevant were the Habitat-Directive, the EIA-Directive, the SEA-Directive and the Water Framework Directive. Comparing these EU policies in the area of environmental precaution it becomes obvious that there is a lot of common ground. Thus, the conclusion seems likely that the European Union, in doing so, has intended to establish general planning concepts through introducing several methodological steps indicated by the regulations. The goal of this article is firstly to point out, which are the common planning principles, converted by methodological elements and secondly examine the consideration of these planning concepts by the implementation and application in the member states. In this context it is analysed whether the connections and divergences between the directives lead to significant differences in the implementation process. To this aim the directives are shortly introduced and significant steps of the processes regulated by them are outlined. In the second steps the national legal implementation in the Alpine states and its consequences for the practical application are discussed. The results show a heterogeneous application of the EU principles. Within the comparative view on the four directives influence and causalities between the national implementation and the practical application were identified, which can be simplified as four types. Since a coherent strategic and methodological concept for improving environmental precaution planning from part of the EU is noticeable, more unity and comparability within the implementation is desirable, particularly in areas with comparable habitats such as the alpine space. Beyond this the trade-off between the directives poses an important task for the future.

  3. Framework for Integrated Water, Energy, and Environmental Resources Assessment, Planning, and Management: Lake Victoria Case Study

    NASA Astrophysics Data System (ADS)

    Georgakakos, A.; Yao, H.; Tidwell, A.

    2006-12-01

    This article describes a recent assessment study for Lake Victoria in East Africa. The study includes three interlinked components. The first pertains to Lake Victoria regulation and includes climate and hydrologic forecasting (seasonal, inter-annual, and centennial), and outflow regulation (water resources planning). The second pertains to energy system planning, and the third to environmental and socio-economic impact assessments. These components converge at the operational level where water, energy, and environmental management are harmonized through the use of a decision support system, the Lake Victoria Decision Support Tool. Some of the broad study findings are summarized below: (1)Lake Victoria is entering a new era in which sustainable water resources management is tightly linked to and can only be achieved by proactive energy planning. To meet this new challenge, and maximize the benefit of the decision support system, water and energy sector decisions must be institutionally coordinated. (2)Climate and hydrologic forecasts of sufficient skill are critical for effective water resources and energy planning and management. More specifically, extensive assessments with several GCMs and climate scenarios indicate that Lake Victoria will most likely be adversely impacted by climate change with potentially serious local and regional consequences. Furthermore, seasonal and inter-annual forecasts are very important in meeting medium term water and energy demands and minimizing the costs of thermal energy generation. (3)Wetland ecological and socio-economic benefits are comparable to power sector benefits, underscoring the need for more comprehensive evaluations of non-power water uses and integrative water, energy, and environmental planning and management. (4)Integrated forecast-decision systems are excellent means to bring to bear and make practically available advances in various water-related disciplines for the benefit of managers and policy makers.

  4. Enforcement four-year strategic plan: Enhanced environmental enforcement for the 1990's

    SciTech Connect

    Not Available

    1991-02-01

    A strong enforcement program is one of the highest priorities for the Environmental Protection Agency (EPA). Aggressive enforcement is the key to effective EPA, State, local and international programs and a clean environment. As the regulatory responsibilities grow, EPA must maintain an enforcement program that will protect human health and the environment, as well as promote pollution prevention and waste minimization on the part of the regulated community. As part of the Agency-wide strategic planning process, EPA directed the Office of Enforcement to develop a comprehensive enforcement plan with both media-specific (i.e., air, water, toxics, etc.) and cross-media components. The Enforcement Four-Year Strategic Plan outlines the capabilities which will be needed to enhance enforcement efforts for the future. Several are now being implemented on a pilot basis, while others will be fully developed over the next several years.

  5. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  6. Strategic environmental assessment in tourism planning - Extent of application and quality of documentation

    SciTech Connect

    Carvalho Lemos, Clara; Fischer, Thomas B.; Pereira Souza, Marcelo

    2012-07-15

    Strategic environmental assessment (SEA) has been applied throughout the world in different sectors and in various ways. This paper reports on results of a PhD research on SEA applied to tourism development planning, reflecting the situation in mid-2010. First, the extent of tourism specific SEA application world-wide is established. Then, based on a review of the quality of 10 selected SEA reports, good practice, as well as challenges, trends and opportunities for tourism specific SEA are identified. Shortcomings of SEA in tourism planning are established and implications for future research are outlined. - Highlights: Black-Right-Pointing-Pointer The extent of tourism specific SEA practice is identified. Black-Right-Pointing-Pointer Selected SEA/Tourism reports are evaluated. Black-Right-Pointing-Pointer SEA application to tourism planning is still limited. Black-Right-Pointing-Pointer A number of shortcomings can be pointed out.

  7. Environmental restoration and waste management department independent safety review committee program management plan

    SciTech Connect

    Not Available

    1992-10-01

    This Program Management Plan (PMP) describes and governs the Independent Safety Review Committee (ISRC) established within the Environmental Restoration and Waste Management Department (ER WMD). The ISRC performs independent safety reviews for the ER WMD as required and specified by the governing documents mentioned above. This PMP defines the ISRC organization, work plan, and scope of work. The PMP is organized consistent with the requirements of DOE Order 4700.1, Project Management System. For the purpose of readability, this document shall use the term program'' to include not only the chartered activities of the ISRC, but also the related activities conducted by the chairman and staff. This PMP is subordinate to the ER WMD Implementing Program Management Plan, EGG-WM-10220.

  8. Environmental restoration and waste management department independent safety review committee program management plan

    SciTech Connect

    Not Available

    1992-10-01

    This Program Management Plan (PMP) describes and governs the Independent Safety Review Committee (ISRC) established within the Environmental Restoration and Waste Management Department (ER&WMD). The ISRC performs independent safety reviews for the ER&WMD as required and specified by the governing documents mentioned above. This PMP defines the ISRC organization, work plan, and scope of work. The PMP is organized consistent with the requirements of DOE Order 4700.1, Project Management System. For the purpose of readability, this document shall use the term ``program`` to include not only the chartered activities of the ISRC, but also the related activities conducted by the chairman and staff. This PMP is subordinate to the ER&WMD Implementing Program Management Plan, EGG-WM-10220.

  9. SU-E-J-244: Development and Validation of a Knowledge Based Planning Model for External Beam Radiation Therapy of Locally Advanced Non-Small Cell Lung Cancer

    SciTech Connect

    Liu, Z; Kennedy, A; Larsen, E; Hayes, C; Grow, A; Bahamondes, S.; Zheng, Y; Wu, X; Choi, M; Pai, S; Li, J; Cranford, K

    2015-06-15

    Purpose: The study aims to develop and validate a knowledge based planning (KBP) model for external beam radiation therapy of locally advanced non-small cell lung cancer (LA-NSCLC). Methods: RapidPlan™ technology was used to develop a lung KBP model. Plans from 65 patients with LA-NSCLC were used to train the model. 25 patients were treated with VMAT, and the other patients were treated with IMRT. Organs-at-risk (OARs) included right lung, left lung, heart, esophagus, and spinal cord. DVH and geometric distribution DVH were extracted from the treated plans. The model was trained using principal component analysis and step-wise multiple regression. Box plot and regression plot tools were used to identify geometric outliers and dosimetry outliers and help fine-tune the model. The validation was performed by (a) comparing predicted DVH boundaries to actual DVHs of 63 patients and (b) using an independent set of treatment planning data. Results: 63 out of 65 plans were included in the final KBP model with PTV volume ranging from 102.5cc to 1450.2cc. Total treatment dose prescription varied from 50Gy to 70Gy based on institutional guidelines. One patient was excluded due to geometric outlier where 2.18cc of spinal cord was included in PTV. The other patient was excluded due to dosimetric outlier where the dose sparing to spinal cord was heavily enforced in the clinical plan. Target volume, OAR volume, OAR overlap volume percentage to target, and OAR out-of-field volume were included in the trained model. Lungs and heart had two principal component scores of GEDVH, whereas spinal cord and esophagus had three in the final model. Predicted DVH band (mean ±1 standard deviation) represented 66.2±3.6% of all DVHs. Conclusion: A KBP model was developed and validated for radiotherapy of LA-NSCLC in a commercial treatment planning system. The clinical implementation may improve the consistency of IMRT/VMAT planning.

  10. Environmental assessment and planning theory: four short stories about power, multiple rationality, and ethics

    SciTech Connect

    Richardson, Tim . E-mail: tim.richardson@sheffield.ac.uk

    2005-05-15

    This paper engages with recent debates in the environmental assessment (EA) literature about the lessons that can be learned from planning theory. It argues that the current communicative turn in EA, echoing a similar shift in planning thought in the 1990s, has failed to benefit from this earlier experience. Instead of following this trend, the paper examines EA from a perspective which is more closely aligned with some of the critics of the communicative approach, and which combines concepts of power, rationality, value and ethics in a different way. First, the paper briefly sets out how planning theory has engaged with these concepts. It then argues that EA needs to engage with competing multiple rationalities, and the inescapable presence of value conflicts within EA. It then turns to recent debates in EA to show how the question of value has become a very difficult issue for EA theorists. These issues are then explored by looking at four cases where environmental impact assessment (EIA) and strategic environmental assessment (SEA) become dramatic sites of struggle, in very different ways: where the boundaries between facts, boundaries, and opinions are defined through power struggles; where SEA is used as a process of brokerage between a fragile coalition of interests; where power defines rationality in the construction of an SEA instrument; and where EIA is challenged from the outside by civil society. The paper closes by discussing how EA practitioners can operate reflexively and ethically in a world of contested rationality.

  11. Institutional Design for Strategic Environmental Assessment on Urban Economic and Social Development Planning in China

    SciTech Connect

    Song Guojun Zhou Li; Zhang Lei

    2011-11-15

    The National Economic and Social Development Plans (NESDPs) of cities in China, given their comprehensive, integrated and strategic nature, have significant and profound impacts on the development of cities and their embedded ecological environments. Strategic Environmental Assessments (SEAs) on city NESDPs have the potential to improve environmental policy integration at strategic level and to safeguard the sustainable development of cities. However, these plans are normally exempted from the current SEA requirement in China. We argue that it is more feasible to apply SEAs on city NESDPs before SEAs are expanded to higher level NESDPs in China. This article attempts to propose a China-specific institutional design for SEAs on city NESDPs based on experiments in selected cities and within the current legal framework. To obtain a holistic view about the long-term development of cities, more qualitative and descriptive analysis-based assessment methods should be adopted to broaden participation, to encourage the exchange of information and to reach consensus. - Highlights: > National Economic and Social Development Plans for Cities (NESDPs) in China is a very popular and significant decision made by municipal government. > We propose a institutional framework to conduct strategic environmental assessment to NESDPs. > The key features of the institutional framework are the independent SEA approval committee and a professional consulting agency.

  12. Shaping the future: A strategic plan for natural resources and environmental management education

    SciTech Connect

    1994-02-01

    As the 21st century nears, the use of natural resources and the preservation of environmental quality are the focus of increased worldwide attention. The Cooperative Extension System (CES) thereby is presented with expanded opportunities and responsibilities for outreach education in natural resources and environmental management (NREM). To meet this challenge, a 17-member team of Extension professionals-selected to represent the geographic, academic, and cultural diversity of the CES-has prepared this report. This document is a plan to guide the Cooperative Extension System in strengthening programs in the area of natural resources and environmental management education. The implementation of this systemwide Strategic Plan and of similar state plans will expand the scope and effectiveness of NREM education and facilitate better service to diverse customers. State NREM support teams will be established to provide leadership, coordinate educational needs and priorities, and increase the resources available for NREM programming. A national NREM support team also will be formed to provide national coordination, resource development, and accountability.

  13. Partnering for environmental restoration: The Port Hope Harbour Remedial Action Plan (RAP)

    SciTech Connect

    Weston, S.M.C.

    1995-12-31

    A Remedial Action Plan (RAP) is being developed for Port Hope Harbour, one of 43 Areas of Concern (AOCs) identified by the International Joint Commission (IJC). The RAP, when implemented, will lead to the restoration and protection of desirable water conditions in Port Hope Harbour. The environmental concern associated with the harbor can be best viewed as a historical contaminated sediment problem. Approximately 90,000 m{sup 3} of sediment located in Port Hope Harbour`s turning basin and west slip are contaminated by uranium and thorium series radionuclides, heavy metals, and PCBs. There are several groups contributing to the development of the RAP. All of these groups have the common goal of developing an environmentally sound plan that reflects the views of the community. Strategic partnerships have been established that recognize the need to integrate and coordinate the efforts of all agencies, stakeholders, and the community. The objective is to develop an environmentally sound remediation plan through an efficient and effective management framework.

  14. Idaho National Engineering and Environmental Laboratory institutional plan -- FY 2000--2004

    SciTech Connect

    Enge, R.S.

    1999-12-01

    In this first institutional plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus its efforts on three strategic thrusts: (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R and D, demonstration, and deployment (initial focus on biofuels and chemicals from biomass). The first strategic thrust focuses on meeting DOE-EMs environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex--the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NEs needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this institutional plan is designed to meet basic DOE requirements for content and structure and reflect the key INEEL strategic thrusts. Updates to this institutional plan will offer additional content and resource refinements.

  15. Environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1995-09-01

    This document presents an Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG 6) at Oak Ridge National Laboratory (ORNL). This document updates a draft monitoring plan developed in 1993. The draft plan was never finalized awaiting resolution of the mechanisms for addressing RCRA concerns at a site where the CERCLA process resulted in a decision to defer action, i.e., postpone closure indefinitely. Over the past two years the Tennessee Department of Environment and Conservation (TDEC), US Department of Energy (DOE), and US Environmental Protection Agency (EPA) Region IV, have agreed that RCRA authority at the site will be maintained through a post- closure permit; ``closure`` in this case referring to deferred action. Both a Revised Closure Plan (DOE 1995a) and a Post-Closure Permit Application (DOE 1995b) have been developed to document this agreement; relevant portions of the EMP will be included in the RCRA Post-Closure Permit Application. As the RCRA issues were being negotiated, DOE initiated monitoring at WAG 6. The purpose of the monitoring activities was to (1) continue to comply with RCRA groundwater quality assessment requirements, (2) install new monitoring equipment, and (3) establish the baseline conditions at WAG 6 against which changes in contaminant releases could be measured. Baseline monitoring is scheduled to end September 30, 1995. Activities that have taken place over the past two years are summarized in this document.

  16. Waste management/waste certification plan for the Oak Ridge National Laboratory Environmental Restoration Program

    SciTech Connect

    Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.

    1995-03-01

    This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency`s (EPA`s) guidance. Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created.

  17. External radiation surveillance

    SciTech Connect

    Antonio, E.J.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report describes how external radiation was measured, how surveys were performed, and the results of these measurements and surveys. External radiation exposure rates were measured at locations on and off the Hanford Site using thermoluminescent dosimeters (TLD). External radiation and contamination surveys were also performed with portable radiation survey instruments at locations on and around the Hanford Site.

  18. Environmental water in a regulated river system: the Murrumbidgee River planning approach to the determination of environmental needs.

    PubMed

    Shields, J; Good, R

    2002-01-01

    The major platform of the Council of Australian Governments (COAG) water reform program is the equitable and sustainable sharing of surface and groundwater resources between the environment and consumptive water users. In the regulated section of the Murrumbidgee River below Burrinjuck Dam, approximately 2,800 GL of the available surface water (4,300 GL) is diverted or extracted for irrigation uses in the Murrumbidgee Irrigation Area and Districts, and in the Coleambally Irrigation Area. Environmental flow rules have been developed for the Murrumbidgee which provide for an allocation of water to the environment but on the basis of no more than a 10% impact on farm-gate income of irrigation farmers. This provision limits the volume of water that can be used for environmental purposes, so the most effective use must be made of it. To identify and quantify the benefits to the environment of this limited additional volume of water and to determine the most effective use of the water, an "environmental spreadsheet matrix" has been developed. This paper outlines the development and use of the matrix in the planned implementation of flow regimes appropriate to the protection and enhancement of riparian and aquatic ecosystems and ecological processes. PMID:12171359

  19. What motivates farmers to participate in the Nova Scotia environmental farm plan program? Evidence and environmental policy implications.

    PubMed

    Atari, Dominic O A; Yiridoe, Emmanuel K; Smale, Shawn; Duinker, Peter N

    2009-02-01

    Program stakeholders are interested in better understanding farmers' experience, and factors that affect farmer participation in the relatively new Environmental Farm Plan (EFP) program, implemented in several provinces in Canada. To increase relevance of the research findings to EFP program administrators and policy makers, the research methods emphasised determining whether relationships exist among program-related variables, and how such relationships affect farmers' decision choices and behaviour. Traditional farmer and farm attributes that have contrasting effects in agricultural innovation adoption and conservation management (namely age, and formal education completed), were not associated with EFP program participation. Farm income, years of farming experience, and type of agribusiness managed were associated with participation in the Nova Scotia EFP program. Although program participants tended to have higher incomes, overall, non-financial considerations dominated monetary considerations in Nova Scotia farmers' reasons for participating in the Nova Scotia EFP. Helping to publicize positive farm stewardship practices was reported as the most important reason for participating in the EFP scheme, followed by its use to help improve relationships with non-farming neighbours, and to comply with government environmental regulations. In contrast, and somewhat a surprising finding, minimizing potential farm environmental risk, program administrators' raison d'être for promoting the NS EFP, was ranked the lowest, with no respondent rating that as a "very important" or "extremely important" reason for participating in the EFP program.

  20. Differentiating weak ties and strong ties among external sources of influences for enterprise resource planning (ERP) adoption

    NASA Astrophysics Data System (ADS)

    Aubert, Benoit; Léger, Pierre-Majorique; Larocque, Denis

    2012-05-01

    Enterprise resource planning (ERP) systems represent a major IT adoption decision. ERP adoption decisions, in the chemicals and allied products sectors, were examined between 1994 and 2005. Networks of strong ties and weak ties partners are investigated. Results show that neighbouring companies linked with strong ties can have an influence on organisations making such adoption decision. Past decisions made by major trading partners have a significant influence on the decision to adopt an ERP system for a given organisation. This reflects the complex nature of the knowledge required for such adoption.

  1. Parasite fitness traits under environmental variation: disentangling the roles of a chytrid's immediate host and external environment.

    PubMed

    Van den Wyngaert, Silke; Vanholsbeeck, Olivier; Spaak, Piet; Ibelings, Bas W

    2014-10-01

    Parasite environments are heterogeneous at different levels. The first level of variability is the host itself. The second level represents the external environment for the hosts, to which parasites may be exposed during part of their life cycle. Both levels are expected to affect parasite fitness traits. We disentangle the main and interaction effects of variation in the immediate host environment, here the diatom Asterionella formosa (variables host cell volume and host condition through herbicide pre-exposure) and variation in the external environment (variables host density and acute herbicide exposure) on three fitness traits (infection success, development time and reproductive output) of a chytrid parasite. Herbicide exposure only decreased infection success in a low host density environment. This result reinforces the hypothesis that chytrid zoospores use photosynthesis-dependent chemical cues to locate its host. At high host densities, chemotaxis becomes less relevant due to increasing chance contact rates between host and parasite, thereby following the mass-action principle in epidemiology. Theoretical support for this finding is provided by an agent-based simulation model. The immediate host environment (cell volume) substantially affected parasite reproductive output and also interacted with the external herbicide exposed environment. On the contrary, changes in the immediate host environment through herbicide pre-exposure did not increase infection success, though it had subtle effects on zoospore development time and reproductive output. This study shows that both immediate host and external environment as well as their interaction have significant effects on parasite fitness. Disentangling these effects improves our understanding of the processes underlying parasite spread and disease dynamics.

  2. Can Perceptions of Environmental and Climate Change in Island Communities Assist in Adaptation Planning Locally?

    PubMed

    Aswani, Shankar; Vaccaro, Ismael; Abernethy, Kirsten; Albert, Simon; de Pablo, Javier Fernández-López

    2015-12-01

    Local perceptions of environmental and climate change, as well as associated adaptations made by local populations, are fundamental for designing comprehensive and inclusive mitigation and adaptation plans both locally and nationally. In this paper, we analyze people's perceptions of environmental and climate-related transformations in communities across the Western Solomon Islands through ethnographic and geospatial methods. Specifically, we documented people's observed changes over the past decades across various environmental domains, and for each change, we asked respondents to identify the causes, timing, and people's adaptive responses. We also incorporated this information into a geographical information system database to produce broad-scale base maps of local perceptions of environmental change. Results suggest that people detected changes that tended to be acute (e.g., water clarity, logging intensity, and agricultural diseases). We inferred from these results that most local observations of and adaptations to change were related to parts of environment/ecosystem that are most directly or indirectly related to harvesting strategies. On the other hand, people were less aware of slower insidious/chronic changes identified by scientific studies. For the Solomon Islands and similar contexts in the insular tropics, a broader anticipatory adaptation planning strategy to climate change should include a mix of local scientific studies and local observations of ongoing ecological changes.

  3. Ecological approach to resource survey and planning for environmentally significant areas: the ABC method

    SciTech Connect

    Bastedo, J.D.; Nelson, J.G.; Theberge, J.B.

    1984-03-01

    A resource survey and planning method for parks, reserves, and other environmentally significant areas (ESAs) is presented in the context of holistic balanced approach to land use and environmental management. This method provides a framework for the acquisition, analysis, presentation, and application of diverse ecological data pertinent to land use planning and resource management within ESAs. Through the independent analysis and subsequent integration of abiotic, biotic, and cultural or ABC information, land areas within an ESA are identified in terms of their relative environmental significance and environmental constraints. The former term encompasses wildlife, historic, and other resource values, while the latter term reflects biophysical hazards and sensitivities, and land use conflicts. The method thus calls for a matching of an ESA's distinctive attributes with appropriate land use and institutional arrangements through an analysis of available acts, regulations, agencies, and other conservation and land use management mechanisms. The method culminates with a management proposal showing proposed park or reserve allocations, buffer areas, or other land use controls aimed at preserving an ESA's special ecological qualities while providing for resource development. The authors suggest that all resource management decisions affecting ESA's should be governed by a philosophical stance that recognizes a spectrum of broad land use types, ranging from preservation to extractive use and rehabilitation.

  4. JEM spotlight: Nuclear desalination--environmental impacts and implications for planning and monitoring activities.

    PubMed

    Anastasov, Vladimir; Khamis, Ibrahim

    2010-01-01

    Nuclear desalination has been identified as an option since the 1960s, but only recently, as climate change intensifies, has it gained interest again. Although environmental impacts of nuclear desalination have not been paid a lot of attention in the few implemented projects, now more than ever, it is essential to provide an overview of their nature and magnitude. The gathered information and basic analysis allow for a general comparison of a 200,000 m(3)/d nuclear desalination facility using a once-through cooling system as a reference case, with alternative co-location options. Results of the review indicate that the potential for marine impacts requires careful planning and monitoring. They also reveal that adverse coastal, atmospheric and socio-economic impacts are minor in comparison with other co-location alternatives. The issues regarding public health are discussed and experiences presented. Nuclear desalination facilities are expected to show a better environmental performance than other co-located power/desalination options. Environmental planning and monitoring activities are thus much simpler and their scope smaller, with the most important monitoring parameters listed. In conclusion, the application of nuclear desalination is recommended as a less environmentally harmful option.

  5. Martin Marietta Energy Systems Environmental Management Plan, FY 1985-1989

    SciTech Connect

    Furth, W.F.; Cowser, K.E.; Jones, C.G.; Mitchell, M.E.; Perry, T.P.A.; Stair, C.L.; Stinton, L.H.

    1985-05-01

    This plan contains the most recent revisions (as of April 1, 1985) identifying and resolving environmental problems during the next five years at the four installations managed for DOE by Martin Marietta Energy Systems, Inc. (Energy Systems). These installations are Oak Ridge National Laboratory (ORNL), Oak Ridge Gaseous Diffusion Plant (ORGDP), Oak Ridge Y-12 Plant (Y-12), and Paducah Gaseous Diffusion Plant (PGDP). The report is not an exhaustive catalogue of environmental programs for which funds will be or have been requested. The thrust is to categorize the environmental challenges by the nature of the challenge. The challenges are identified by categories: (1) radioactive waste, (2) hazardous waste, (3) co-contaminated waste (hazardous and radioactive contaminated), (4) conventional waste, (5) monitoring, and (6) remedial actions and decommissioning.

  6. Environmental program planning for the proposed high-level nuclear waste repository at Yucca Mountain, Nevada; Volume 1

    SciTech Connect

    1987-08-01

    Environmental protection during the course of siting and constructing a repository is mandated by NWPA in conjunction with various phases of repository siting and development. However, DOE has issued no comprehensive, integrated plan for environmental protection. Consequently, it is unclear how DOE will accomplish environmental assessment, monitoring, impact mitigation, and site reclamation. DOE should, therefore, defer further implementation of its current characterization program until a comprehensive environmental protection plan is available. To fulfill its oversight responsibilities the State of Nevada has proposed a comprehensive environmental program for the Yucca Mountain site that includes immediately undertaking studies to establish a 12-month baseline of environmental information at the site; adopting the DOE Site Characterization Plan (SCP) and the engineering design plans it will contain as the basis for defining the impact potential of site characterization activities; using the environmental baseline and the SCP to evaluate the efficacy of the preliminary impact analyses reported by DOE in the EA; using the SCP as the basis for discussions with federal, state, and local regulatory authorities to decide which environmental requirements apply and how they can be complied with; using the SCP, the EA impact review, and the compliance requirements to determine the scope of reclamation measures needed; and developing environmental monitoring and impact mitigation plans based on the EA impact review, compliance requirements, and anticipated reclamation needs.

  7. Environmental impact assessment in urban transport planning: Exploring process-related barriers in Spanish practice

    SciTech Connect

    Soria-Lara, Julio A. Bertolini, Luca Brömmelstroet, Marco te

    2015-01-15

    The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in the field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes.

  8. Strategic environmental assessment (SEA) for wind energy planning: Lessons from the United Kingdom and Germany

    SciTech Connect

    Phylip-Jones, J. Fischer, T.B.

    2015-01-15

    This paper reports on SEA applied in the wind energy sector in the UK and Germany. Based on a review of 18 SEAs, it is found that the quality of SEA documentation is variable, with over a third of them being deemed unsatisfactory. Furthermore, SEA processes are conducted to varying degrees of effectiveness, with scoping a strength but impact prediction and mitigation weaknesses. Generally speaking, the influence of SEA on German wind energy plan making was found to be low and the influence of SEA on UK plans deemed to be moderate. The German plans had a low influence mainly because of a perceived high environmental performance of the underlying plans in the first instance. Substantive outcomes of SEA are not always clear and the influence of SEA on decision making is said to be limited in many cases. Finally, a lack of effective tiering between SEA and project level EIA is also observed. In addition, our findings echo some of the weaknesses of SEA practice found in previous studies of SEA effectiveness, including poor impact prediction and significance sections and a lack of detailed monitoring programmes for post plan implementation.

  9. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... National Park Service General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final... Management Plan/Wilderness Study/Off-Road Vehicle Management Plan (FEIS/GMP/WS/ORV Plan), Big Cypress... proposed wilderness (about 37,567 acres), and develop limited new hiking-only trails. The entire...

  10. Applying comprehensive environmental assessment to research planning for multiwalled carbon nanotubes: Refinements to inform future stakeholder engagement.

    PubMed

    Powers, Christina M; Grieger, Khara; Meacham, Connie A; Gooding, Meredith Lassiter; Gift, Jeffrey S; Lehmann, Geniece M; Hendren, Christine O; Davis, J Michael; Burgoon, Lyle

    2016-01-01

    Risk assessments and risk management efforts to protect human health and the environment can benefit from early, coordinated research planning by researchers, risk assessors, and risk managers. However, approaches for engaging these and other stakeholders in research planning have not received much attention in the environmental scientific literature. The Comprehensive Environmental Assessment (CEA) approach under development by the United States Environmental Protection Agency (USEPA) is a means to manage complex information and input from diverse stakeholder perspectives on research planning that will ultimately support environmental and human health decision making. The objectives of this article are to 1) describe the outcomes of applying lessons learned from previous CEA applications to planning research on engineered nanomaterial, multiwalled carbon nanotubes (MWCNTs) and 2) discuss new insights and refinements for future efforts to engage stakeholders in research planning for risk assessment and risk management of environmental issues. Although framed in terms of MWCNTs, this discussion is intended to enhance research planning to support assessments for other environmental issues as well. Key insights for research planning include the potential benefits of 1) ensuring that participants have research, risk assessment, and risk management expertise in addition to diverse disciplinary backgrounds; 2) including an early scoping step before rounds of formal ratings; 3) using a familiar numeric scale (e.g., US dollars) versus ordinal rating scales of "importance"; 4) applying virtual communication tools to supplement face-to-face interaction between participants; and 5) refining criteria to guide development of specific, actionable research questions.

  11. Retinoblastoma external beam photon irradiation with a special ‘D’-shaped collimator: a comparison between measurements, Monte Carlo simulation and a treatment planning system calculation

    NASA Astrophysics Data System (ADS)

    Brualla, L.; Mayorga, P. A.; Flühs, A.; Lallena, A. M.; Sempau, J.; Sauerwein, W.

    2012-11-01

    Retinoblastoma is the most common eye tumour in childhood. According to the available long-term data, the best outcome regarding tumour control and visual function has been reached by external beam radiotherapy. The benefits of the treatment are, however, jeopardized by a high incidence of radiation-induced secondary malignancies and the fact that irradiated bones grow asymmetrically. In order to better exploit the advantages of external beam radiotherapy, it is necessary to improve current techniques by reducing the irradiated volume and minimizing the dose to the facial bones. To this end, dose measurements and simulated data in a water phantom are essential. A Varian Clinac 2100 C/D operating at 6 MV is used in conjunction with a dedicated collimator for the retinoblastoma treatment. This collimator conforms a ‘D’-shaped off-axis field whose irradiated area can be either 5.2 or 3.1 cm2. Depth dose distributions and lateral profiles were experimentally measured. Experimental results were compared with Monte Carlo simulations’ run with the penelope code and with calculations performed with the analytical anisotropic algorithm implemented in the Eclipse treatment planning system using the gamma test. penelope simulations agree reasonably well with the experimental data with discrepancies in the dose profiles less than 3 mm of distance to agreement and 3% of dose. Discrepancies between the results found with the analytical anisotropic algorithm and the experimental data reach 3 mm and 6%. Although the discrepancies between the results obtained with the analytical anisotropic algorithm and the experimental data are notable, it is possible to consider this algorithm for routine treatment planning of retinoblastoma patients, provided the limitations of the algorithm are known and taken into account by the medical physicist and the clinician. Monte Carlo simulation is essential for knowing these limitations. Monte Carlo simulation is required for optimizing the

  12. Synergies and Tradeoffs Among Environmental Impacts Under Conservation Planning of Shale Gas Surface Infrastructure.

    PubMed

    Milt, Austin W; Gagnolet, Tamara; Armsworth, Paul R

    2016-01-01

    Hydraulic fracturing and related ground water issues are growing features in public discourse. Few have given much attention to surface impacts from shale gas development, which result from building necessary surface infrastructure. One way to reduce future impacts from gas surface development without radically changing industry practice is by formulating simple, conservation-oriented planning guidelines. We explore how four such guidelines affect the locations of well pads, access roads, and gathering pipelines on state lands in Pennsylvania. Our four guidelines aim to (1) reduce impacts on water, reduce impacts from (2) gathering pipelines and (3) access roads, and (4) reduce impacts on forests. We assessed whether the use of such guidelines accompanies tradeoffs among impacts, and if any guidelines perform better than others at avoiding impacts. We find that impacts are mostly synergistic, such that avoiding one impact will result in avoiding others. However, we found that avoiding forest fragmentation may result in increased impacts on other environmental features. We also found that single simple planning guidelines can be effective in targeted situations, but no one guideline was universally optimal in avoiding all impacts. As such, we suggest that when multiple environmental features are important in an area, more comprehensive planning strategies and tools should be used. PMID:26275668

  13. Synergies and Tradeoffs Among Environmental Impacts Under Conservation Planning of Shale Gas Surface Infrastructure.

    PubMed

    Milt, Austin W; Gagnolet, Tamara; Armsworth, Paul R

    2016-01-01

    Hydraulic fracturing and related ground water issues are growing features in public discourse. Few have given much attention to surface impacts from shale gas development, which result from building necessary surface infrastructure. One way to reduce future impacts from gas surface development without radically changing industry practice is by formulating simple, conservation-oriented planning guidelines. We explore how four such guidelines affect the locations of well pads, access roads, and gathering pipelines on state lands in Pennsylvania. Our four guidelines aim to (1) reduce impacts on water, reduce impacts from (2) gathering pipelines and (3) access roads, and (4) reduce impacts on forests. We assessed whether the use of such guidelines accompanies tradeoffs among impacts, and if any guidelines perform better than others at avoiding impacts. We find that impacts are mostly synergistic, such that avoiding one impact will result in avoiding others. However, we found that avoiding forest fragmentation may result in increased impacts on other environmental features. We also found that single simple planning guidelines can be effective in targeted situations, but no one guideline was universally optimal in avoiding all impacts. As such, we suggest that when multiple environmental features are important in an area, more comprehensive planning strategies and tools should be used.

  14. Synergies and Tradeoffs Among Environmental Impacts Under Conservation Planning of Shale Gas Surface Infrastructure

    NASA Astrophysics Data System (ADS)

    Milt, Austin W.; Gagnolet, Tamara; Armsworth, Paul R.

    2016-01-01

    Hydraulic fracturing and related ground water issues are growing features in public discourse. Few have given much attention to surface impacts from shale gas development, which result from building necessary surface infrastructure. One way to reduce future impacts from gas surface development without radically changing industry practice is by formulating simple, conservation-oriented planning guidelines. We explore how four such guidelines affect the locations of well pads, access roads, and gathering pipelines on state lands in Pennsylvania. Our four guidelines aim to (1) reduce impacts on water, reduce impacts from (2) gathering pipelines and (3) access roads, and (4) reduce impacts on forests. We assessed whether the use of such guidelines accompanies tradeoffs among impacts, and if any guidelines perform better than others at avoiding impacts. We find that impacts are mostly synergistic, such that avoiding one impact will result in avoiding others. However, we found that avoiding forest fragmentation may result in increased impacts on other environmental features. We also found that single simple planning guidelines can be effective in targeted situations, but no one guideline was universally optimal in avoiding all impacts. As such, we suggest that when multiple environmental features are important in an area, more comprehensive planning strategies and tools should be used.

  15. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 496: Buried Rocket Site, Antelope Lake, Tonopah Test Range

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    2004-05-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan details the activities necessary to close Corrective Action Unit 496: Buried Rocket Site, Antelope Lake. CAU 496 consists of one site located at the Tonopah Test Range, Nevada.

  16. Operations, Maintenance, and Replacement 10-Year Plan 1990-1999 : Environmental Strategy. Final Report.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-09-01

    In operating and maintaining its regional power transmission system, Bonneville Power Administration (BPA) must address environmental concerns. Pollution sources and pathways for pollution migration, including potential contamination from hazardous or toxic materials, are present. BPA must develop and follow precautionary measures, respond to emergencies, minimize wastes, redress past problems, alert and train employees to problems and safety needs, constantly evaluate this effort and update the program for improvements and changes in regulations and technology. Part of BPA's mission is to conduct its operation, maintenance, and replacement programs in an environmentally sound manner. BPA recognizes its responsibility to be good stewards of the environment. BPA will meet its environmental obligations as set forth in environmental laws and regulations. BPA intends to make consistent and measurable progress toward meeting these responsibilities. The target for the 10-Year Plan is to achieve environmental compliance and meet the following goals: (1) protect human health and the environment; (2) avoid or limit liability (3) set up an effective internal management structure to maintain compliance; and (4) achieve cost-effective compliance. 6 figs.

  17. Addendum to environmental monitoring plan Nevada Test Site and support facilities

    SciTech Connect

    1992-11-01

    This 1992 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/1 0630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Field Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1992 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

  18. Addendum to Environmental Monitoring Plan, Nevada Test Site and Support Facilities; Addendum 2

    SciTech Connect

    1993-11-01

    This 1993 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/10630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Operations Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1993 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

  19. Avança Brasil: environmental and social consequences of Brazil's planned infrastructure in Amazonia.

    PubMed

    Fearnside, Philip M

    2002-12-01

    "Avança Brasil" (Forward Brazil) is a package of 338 projects throughout Brazil; the portion of the plan to be carried out in Brazil's Legal Amazon region totals US$43 billion over 8 years, US$20 billion of which would be for infrastructure causing environmental damage. Brazil's environmental impact assessment system is not yet capable of coping with the challenge presented by Avança Brasil. Generic problems with the licensing process include stimulation of a lobby in favor of construction before decisions are made on the advisability of the projects, the "dragging effect" of third parties, whereby economic activity is attracted to the infrastructure but escapes the environmental impact assessment system, a tendency for consulting firms to produce favorable reports, a bureaucratic emphasis on the existence of steps without regard to the content of what is said, and the inability to take account of the chain of events unleashed when a given project is undertaken. The environmental and social costs of forest loss are high; among them is loss of opportunities for sustainable use of the forest, including loss of environmental services such as biodiversity maintenance, water cycling, and carbon storage. The benefits of export infrastructure are meager, especially from the point of view of generating employment. Much of the transportation infrastructure is for soybeans, while the hydroelectric dams contribute to processing aluminum. The example of Avança Brasil makes clear the need to rethink how major development decisions are made and to reconsider a number of the plan's component projects. PMID:12402090

  20. Final Report: African Power/Energy and Environmental Development Plan, July 1, 1994 - August 21, 1999

    SciTech Connect

    Butler, John M.

    1999-08-21

    In 1994 AEF signed a Cooperative Agreement with DOE to address a program called the African Power /Energy and Environmental Development Plan. The Program initially addressed five area: (1) Historical Black Colleges and Universities Energy/Environmental Program; (2) The Department of Energy and United States Private Industry Africa Program; (3) The Annual United States Energy Study Tour; (4) South African Training Program, and (5) South African Environmental Program. The programs were implemented in conjunction with DOE, institutions, agencies and the private sector support in the USA and within African nations. AEF has worked with government and technical representatives from 13 African nations and expanded the program to address sponsorship of South African students in Historical Black Colleges and Universities, supporting DOE trade missions through participation and planning, and giving presentations in the U.S., and Africa regarding business opportunities in the African energy sector. The programs implemented have also opened doors for the US private sector to seek business opportunities in Africa and for African nations to gain exposure to US products and services.

  1. Review of ultrasound image guidance in external beam radiotherapy: I. Treatment planning and inter-fraction motion management

    NASA Astrophysics Data System (ADS)

    Fontanarosa, Davide; van der Meer, Skadi; Bamber, Jeffrey; Harris, Emma; O'Shea, Tuathan; Verhaegen, Frank

    2015-02-01

    In modern radiotherapy, verification of the treatment to ensure the target receives the prescribed dose and normal tissues are optimally spared has become essential. Several forms of image guidance are available for this purpose. The most commonly used forms of image guidance are based on kilovolt or megavolt x-ray imaging. Image guidance can also be performed with non-harmful ultrasound (US) waves. This increasingly used technique has the potential to offer both anatomical and functional information. This review presents an overview of the historical and current use of two-dimensional and three-dimensional US imaging for treatment verification in radiotherapy. The US technology and the implementation in the radiotherapy workflow are described. The use of US guidance in the treatment planning process is discussed. The role of US technology in inter-fraction motion monitoring and management is explained, and clinical studies of applications in areas such as the pelvis, abdomen and breast are reviewed. A companion review paper (O’Shea et al 2015 Phys. Med. Biol. submitted) will extensively discuss the use of US imaging for intra-fraction motion quantification and novel applications of US technology to RT.

  2. US Department of Energy Oak Ridge Operations Environmental Management Public Involvement Plan for the Oak Ridge Reservation

    SciTech Connect

    1996-03-01

    This document was prepared in accordance with CERCLA requirements for writing community relations plans. It includes information on how the DOE Oak Ridge Operations Office prepares and executes Environmental Management Community relations activities. It is divided into three sections: the public involvement plan, public involvement in Oak Ridge, and public involvement in 1995. Four appendices are also included: environmental management in Oak Ridge; community and regional overview; key laws, agreements, and policy; and principal contacts.

  3. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    SciTech Connect

    Not Available

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made.

  4. Environmental screening tools for assessment of infrastructure plans based on biodiversity preservation and global warming (PEIT, Spain)

    SciTech Connect

    Garcia-Montero, Luis G.

    2010-04-15

    Most Strategic Environmental Assessment (SEA) research has been concerned with SEA as a procedure, and there have been relatively few developments and tests of analytical methodologies. The first stage of the SEA is the 'screening', which is the process whereby a decision is taken on whether or not SEA is required for a particular programme or plan. The effectiveness of screening and SEA procedures will depend on how well the assessment fits into the planning from the early stages of the decision-making process. However, it is difficult to prepare the environmental screening for an infrastructure plan involving a whole country. To be useful, such methodologies must be fast and simple. We have developed two screening tools which would make it possible to estimate promptly the overall impact an infrastructure plan might have on biodiversity and global warming for a whole country, in order to generate planning alternatives, and to determine whether or not SEA is required for a particular infrastructure plan.

  5. Towards integrated water resources management in Colombia: challenges and opportunities for spatial environmental planning

    NASA Astrophysics Data System (ADS)

    Salazar, Sergio; Hernández, Sebastián

    2015-04-01

    Only until 2010 was enacted the first national policy related to the integrated management of water resources in Colombia. In 2011 was established the Directorate for Integrated Water Resources Management within the Ministry of Environment and Sustainable Development. Between 2010 to 2013 were adopted the regulatory instruments to be developed within the hierarchical structure for spatial environmental planning around the water resources, considering both a transdisciplinary framework and a multi-ethnic and multi-participatory approach. In this context, there is a breakthrough in the development of strategic and tactic actions summarized as follows: i) technical guidelines or projects were developed for the spatial environmental planning at the macroscale river basins (i.e. Magdalena-Cauca river basin with 2.3 million hectares), meso-scale (river basins from 50.000 to 2 million hectares and aquifers) and local scale (catchments areas less than 50.000 hectares); ii) there is an advance in the knowledge of key hydrological processes in the basins of the country as well as actions to restore and preserve ecosystems essential for the regulation of water supply and ecosystem services; iii) demand characterization introducing regional talks with socio-economic stakeholders and promoting water efficiency actions; iv) water use regulation as a way for decontamination and achieving quality standards for prospective uses; v) introduction of risks analysis associated with water resources in the spatial environmental planning and establishment of mitigation and adaptation measures; vi) strengthening the monitoring network of water quality and hydrometeorological variables; vii) strengthening interactions with national and international research as well as the implementation of a national information system of water resources; viii) steps towards water governance with the introduction of socio-economic stakeholder in the spatial environmental planning and implementation of

  6. Strategic foresight: how planning for the unpredictable can improve environmental decision-making.

    PubMed

    Cook, Carly N; Inayatullah, Sohail; Burgman, Mark A; Sutherland, William J; Wintle, Brendan A

    2014-09-01

    Advanced warning of potential new opportunities and threats related to biodiversity allows decision-makers to act strategically to maximize benefits or minimize costs. Strategic foresight explores possible futures, their consequences for decisions, and the actions that promote more desirable futures. Foresight tools, such as horizon scanning and scenario planning, are increasingly used by governments and business for long-term strategic planning and capacity building. These tools are now being applied in ecology, although generally not as part of a comprehensive foresight strategy. We highlight several ways foresight could play a more significant role in environmental decisions by: monitoring existing problems, highlighting emerging threats, identifying promising new opportunities, testing the resilience of policies, and defining a research agenda.

  7. 76 FR 35009 - Draft Oil and Gas Management Plan/Environmental Impact Statement for Big South Fork National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... and gas management plan for BISO and OBRI was published in the Federal Register on May 31, 2006 (71 FR... National Park Service Draft Oil and Gas Management Plan/Environmental Impact Statement for Big South Fork... Big South Fork National River and Recreation Area and Obed Wild and Scenic River. SUMMARY: Pursuant...

  8. An Introduction to the Importance of Photography and Gaming Simulation to the Regional Planning Process, Environmental Design and Community Development.

    ERIC Educational Resources Information Center

    Steward, W. C.; Menary, John A.

    This report attempts to interrelate essential concepts in visual communication and gaming-simulation with problem solving and education in the fields of regional environmental planning, design, and community development. Use of these methodologies in educating the general public in regional planning topics is also covered. The use of visual or…

  9. From Reactionary to Responsive: Applying the Internal Environmental Scan Protocol to Lifelong Learning Strategic Planning and Operational Model Selection

    ERIC Educational Resources Information Center

    Downing, David L.

    2009-01-01

    This study describes and implements a necessary preliminary strategic planning procedure, the Internal Environmental Scanning (IES), and discusses its relevance to strategic planning and university-sponsored lifelong learning program model selection. Employing a qualitative research methodology, a proposed lifelong learning-centric IES process…

  10. 75 FR 77654 - Notice of Intent To Prepare a Land Use Plan Amendment and an Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... Bureau of Land Management Notice of Intent To Prepare a Land Use Plan Amendment and an Environmental..., biological resources, recreation, cultural resources, water resources, geological resources, land use, noise... the public of potential amendments to land use plans. The BLM will integrate the land use...

  11. 36 CFR 223.113 - Modification of contracts to prevent environmental damage or to conform to forest plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TIMBER Timber Sale Contracts Contract Administration § 223.113 Modification of contracts to prevent environmental damage or to conform to forest plans. Timber sale contract, permits, and other such instruments... revisions of land and resource management plans adopted subsequent to award or issuance of a timber...

  12. 78 FR 12352 - Notice of Intent To Prepare an Environmental Impact Statement for the Wilderness Stewardship Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Stewardship Plan, Olympic National Park, Clallam, Grays Harbor, Jefferson and Mason County, WA AGENCY... Wilderness Stewardship Plan (WSP) and Environmental Impact Statement (EIS) will be developed to provide... stewardship objectives and conducting wilderness eligibility studies for areas identified in the GMP Record...

  13. Common Genetic and Nonshared Environmental Factors Contribute to the Association between Socioemotional Dispositions and the Externalizing Factor in Children

    ERIC Educational Resources Information Center

    Taylor, Jeanette; Allan, Nicholas; Mikolajewski, Amy J.; Hart, Sara A.

    2013-01-01

    Background: Childhood behavioral disorders including conduct disorder (CD), oppositional defiant disorder (ODD), and attention-deficit/hyperactivity disorder (ADHD) often co-occur. Prior twin research shows that common sets of genetic and environmental factors are associated with these various disorders and they form a latent factor called…

  14. Richland Environmental Restoration Project Fiscal Year 2000--2002 Detailed Work Plan -- Surveillance/Maintenance and Transition Project

    SciTech Connect

    Swan, K.N.

    1999-09-29

    The US Department of Energy (DOE), Richland Operations Office (RL), directed Hanford Site contractors to update multi-year work plans in accordance with the guidance provided to them. The Richland Environmental Restoration Project continued the Detailed Work Plan update approach that was approved in fiscal year 1998. This Detailed Work Plan provides the cost, scope, and schedule for the FY00 through FY02 activities required to support the Surveillance/Maintenance and Transition Project.

  15. Soil information in the Strategic Environmental Assessment of Rural Development Plans

    NASA Astrophysics Data System (ADS)

    Costantini, Edoardo

    2016-04-01

    Soil information is essential for land planning at different administrative levels. Currently, in Europe there is a hierarchy of at least seven main territorial administrative entities which consider soil in their land planning policies. In this study, European, national and regional regulations that affect soil are discussed, considering themes, priorities, and focus areas. A better attention on the Strategic Environmental Assessment (SEA) of the Rural Development Plans (RDP) 2014-2020 is given, by analysing the Environmental Reports produced in the framework of the SEA of the RDP 2014-2020 of some European Regions. Both old and new soil indicators are introduced, as well as the consequences of their adoption for soil science and soil scientists. It is evident from this study that soil information is treated very variably, not only because of the different kinds of available information, but mainly as a consequence of the expertise and sensitivity to the soil issues of the authors, since they can be different kinds of public or private bodies hired by regional authorities. Therefore, despite having the same reference, the SEAs are very different. In most cases, the amount of soil information is little or negligible, even when available. The ex-ante impacts are often only qualitative, or quantified only in terms of the areal extent of applied measures. On the other hand, following the European recommendations, the ongoing and ex-post reports of the monitoring activities of RDP are expected to provide a wealth of soil information, both qualitative and quantitative. Soil scientists, soil and water conservationists, and management experts will be requested to provide more sophisticated and dynamic types of information. Therefore, the SEA of RDP and similar land planning activities will provide greater scientific and technical opportunities for soil science, provided that the public bodies in charge of evaluations, namely Member States, Regions and their auditing

  16. Sustainability principles in strategic environmental assessment: A framework for analysis and examples from Italian urban planning

    SciTech Connect

    Lamorgese, Lydia Geneletti, Davide

    2013-09-15

    This paper presents a framework for analysing the degree of consideration of sustainability principles in Strategic environmental assessment (SEA), and demonstrates its application to a sample of SEA of Italian urban plans. The framework is based on Gibson's (2006) sustainability principles, which are linked to a number of guidance criteria and eventually to review questions, resulting from an extensive literature review. A total of 71 questions are included in the framework, which gives particular emphasis to key concepts, such as intragenerational and intergenerational equity. The framework was applied to review the Environmental Report of the urban plans of 15 major Italian cities. The results of this review show that, even if sustainability is commonly considered as a pivotal concept, there is still work to be done in order to effectively integrate sustainability principles into SEA. In particular, most of the attention is given to mitigation and compensation measures, rather than to actual attempts to propose more sustainable planning decisions in the first place. Concerning the proposed framework of analysis, further research is required to clarify equity concerns and particularly to identify suitable indicators for operationalizing the concepts of intra/inter-generational equity in decision-making. -- Highlights: ► A framework was developed in order to evaluate planning against sustainability criteria. ► The framework was applied to analyse how sustainable principles are addressed in 15 Italian SEA reports. ► Over 85% of the reports addressed, to some extent, at least 40% of the framework questions. ► Criteria explicitly linked to intra and inter-generational equity are rarely addressed.

  17. Environmental monitoring and assessment program forest health monitoring quality assurance project plan for detection monitoring project

    SciTech Connect

    Cline, S.P.; Alexander, S.A.; Barnard, J.E.

    1995-05-01

    The Quality Assurance Project Plan (QAP) is written specifically for the Detection Minitoring project of the interagency Forest Health Monitoring (FHM) program. Sections 1 through 3 briefly explain key features of the Environmental Monitoring and Assessment Program (EMAP), the FHM program, and their interrelationship, respectively. Section 4 describes the general quality assurance (QA) requirements for the FHM Detection Monitoring project. Section 5 contains the separate QAPs for each forest condition indicator: site condition and tree growth and regeneration, tree crown condition, tree damage assessment, photosynthetically active radiation (PAR), vegetation structure, ozone bioindicator plants, and lichen communities.

  18. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    SciTech Connect

    Not Available

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  19. Grid-based modeling for land use planning and environmental resource mapping.

    SciTech Connect

    Kuiper, J. A.

    1999-08-04

    Geographic Information System (GIS) technology is used by land managers and natural resource planners for examining resource distribution and conducting project planning, often by visually interpreting spatial data representing environmental or regulatory variables. Frequently, many variables influence the decision-making process, and modeling can improve results with even a small investment of time and effort. Presented are several grid-based GIS modeling projects, including: (1) land use optimization under environmental and regulatory constraints; (2) identification of suitable wetland mitigation sites; and (3) predictive mapping of prehistoric cultural resource sites. As different as the applications are, each follows a similar process of problem conceptualization, implementation of a practical grid-based GIS model, and evaluation of results.

  20. Implementation of the DOE Office of Technology Development Strategic Program Plan for Environmental Education and Development

    SciTech Connect

    Prestwich, S.M.; Chee, T.C. ); Middleman, L.I. )

    1992-01-01

    With the November 1989 formation of the Office of Technology Development (OTD) within the Office of Environmental Restoration and Waste Management (EM) came the responsibility to develop programs to ensurethat enough trained and educated people would be available to support the achievement of EM's 30-year goal. This mission responsibility derives from public policy and Departmental environmental management requirements. Within DOE, urgency to move forward resulted from the assumptions (1) that the current workforce was insufficiently prepared for the transition from a production mission to a mission of environmental compliance and cleanup; and (2) that, given current trends and forecasts, the national education infrastructure was unlikely to yield the scientists, engineers, and technicians to meet future DOE workforce needs, especially in the case of women and minorities who, projected to make up two-thirds of the net entering workforce by the year 2000, have traditionally been least prepared for and inclined to enter scientific and technical fields. This paper displays DOE's environmental education and development mission, goals, and strategy, and describes progress in and plans for implementing this strategy.

  1. Environmental issues relevant to the preparation of USAID/Mozambique`s country program strategic plan

    SciTech Connect

    1994-01-01

    The present moment offers a unique opportunity to address Mozambique`s environmental problems, according to this assessment of Mozambique`s natural and environmental resources. Conducted to help USAID/M prepare its Country Program Strategic Plan (CPSP), the assessment covers: (1) the status of Mozambique`s natural resources (soil and land, water, vegetative cover, wildlife/biodiversity and nonrenewable resources), with emphasis on conservation and management of biological diversity and tropical forests; (2) shortcomings in the knowledge and management of these resources; (3) the efforts of other donors and NGOs to address natural resources degradation; and (4) recommendations. According to the report, while all three of the CPSP`s focus areas -- income generation, social services, the democratic governance -- can contribute notably to sustainable use of the environment, the income focus will have the most impact, as families who are struggling to survive often turn to destructive patterns of land use. The report cautions USAID/M not to neglect, in its emphasis on NGOs, the state agencies that will be responsible for guaranteeing security in areas such as land rights. In particular, the Mission should promote the policymaking and enforcement role of the National Commission for the Environment (CNA) and should involve the CNA in Mission environmental assessments. Appendices include a summary of donor environmental activities in Mozambique; a tabulated portrait of Mozambique`s forest resources and forestry sector; and a list of state agencies with responsibilities in Mozambique`s coastal zone.

  2. Regulatory experience in applying a radiological environmental protection framework for existing and planned nuclear facilities.

    PubMed

    Mihok, S; Thompson, P

    2012-01-01

    Frameworks and methods for the radiological protection of non-human biota have been evolving rapidly at the International Commission on Radiological Protection and through various European initiatives. The International Atomic Energy Agency has incorporated a requirement for environmental protection in the latest revision of its Basic Safety Standards. In Canada, the Canadian Nuclear Safety Commission has been legally obligated to prevent unreasonable risk to the environment since 2000. Licensees have therefore been meeting generic legal requirements to demonstrate adequate control of releases of radioactive substances for the protection of both people and biota for many years. In the USA, in addition to the generic requirements of the Environmental Protection Agency and the Nuclear Regulatory Commission, Department of Energy facilities have also had to comply with specific dose limits after a standard assessment methodology was finalised in 2002. Canadian regulators developed a similar framework for biota dose assessment through a regulatory assessment under the Canadian Environmental Protection Act in the late 1990s. Since then, this framework has been applied extensively to satisfy legal requirements under the Canadian Environmental Assessment Act and the Nuclear Safety and Control Act. After approximately a decade of experience in applying these methods, it is clear that simple methods are fit for purpose, and can be used for making regulatory decisions for existing and planned nuclear facilities.

  3. Implementation of the DOE Office of Technology Development Strategic Program Plan for Environmental Education and Development

    SciTech Connect

    Prestwich, S.M.; Chee, T.C.; Middleman, L.I.

    1992-12-31

    With the November 1989 formation of the Office of Technology Development (OTD) within the Office of Environmental Restoration and Waste Management (EM) came the responsibility to develop programs to ensurethat enough trained and educated people would be available to support the achievement of EM`s 30-year goal. This mission responsibility derives from public policy and Departmental environmental management requirements. Within DOE, urgency to move forward resulted from the assumptions (1) that the current workforce was insufficiently prepared for the transition from a production mission to a mission of environmental compliance and cleanup; and (2) that, given current trends and forecasts, the national education infrastructure was unlikely to yield the scientists, engineers, and technicians to meet future DOE workforce needs, especially in the case of women and minorities who, projected to make up two-thirds of the net entering workforce by the year 2000, have traditionally been least prepared for and inclined to enter scientific and technical fields. This paper displays DOE`s environmental education and development mission, goals, and strategy, and describes progress in and plans for implementing this strategy.

  4. 75 FR 26220 - Notice of Intent to Prepare an Environmental Assessment for the Planned Leader One Gas Storage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Intent to Prepare an Environmental Assessment for the Planned Leader One Gas Storage Project, Request for Comments on Environmental Issues, and Notice of a Site Visit April 30, 2010. The staff of the...

  5. 78 FR 79688 - Paiute Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Paiute Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned 2015 Elko Area Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting...

  6. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: the city of Belgrade.

    PubMed

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-02-01

    Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.

  7. Environmental planning and management in an age of uncertainty: the case of the Water Framework Directive.

    PubMed

    Carter, Jeremy G; White, Iain

    2012-12-30

    Scenario planning is one of the most prominent methods applied by organisations to assist long-term decision making. This paper uses a case study method to demonstrate how scenarios can be operationalised to inform future strategies and to challenge rigid silo-based decision making approaches. The WaterProof Northwest scenarios developed by the authors in collaboration with a range of stakeholders, and described within this paper, offer a platform for considering the future of the water environment. The scenarios were developed in the context of meeting the goals of the European Water Framework Directive. This Directive has the core aim of improving the chemical and ecological status of Europe's water bodies. The scenarios highlight that water bodies in the case study area (the region of Northwest England) are impacted directly by a wide array of driving forces which will affect the state of the water environment over the coming decades. This analysis demonstrates that organisations responsible for creating and implementing long-term plans and policies to manage water are often far removed from the forces that will influence the effectiveness of the exercises that they are engaged in. The WaterProof Northwest scenarios highlight that organisations need different decision making approaches in order to adapt to modern environmental challenges. They also raise questions over whether environmental legislation such as the Water Framework Directive should incorporate a futures perspective in recognition of the wide ranging forces influencing their implementation.

  8. Surface mine planning and design implications and theory of a visual environmental quality predictive model

    SciTech Connect

    Burley, J.B.

    1999-07-01

    Surface mine planners and designers are searching for scientifically based tools to assist in the pre-mine planning and post-mine development or surface mine sites. In this study, the author presents a science based visual and environmental quality predictive model useful in preparing and assessing landscape treatments for surface mine sites. The equation explains 67 percent of respondent preference, with an overall p-value for the equation >0.0001 and a p-value >0.05 for each regressor. Regressors employed in the equation include an environmental quality index, foreground vegetation, distant nonvegetation, people, vehicles, utilities, foreground flowers, foreground erosion, wildlife, landscape openness, landscape mystery, and noosphericness (a measure of human disturbance). The equation can be explained with an Intrusion/Neutral Modifier/Temporal Enhancement Theory which suggests that human intrusions upon other humans results in landscape of low preference and which also suggests that landscape containing natural and special temporal features such as wildlife and flowers can enhance the value of a landscape scene. This research supports the importance of visual barriers such as berms and vegetation screens during mining operations and supports public perceptions concerning many types of industrial activities. In addition, the equation can be applied to study post-mining landscape development plans to maximize the efficiency and effectiveness of landscape treatments.

  9. Final rules under the Paul Wellstone and Pete Domenici Mental Health Parity and Addiction Equity Act of 2008; technical amendment to external review for multi-state plan program. Final rules.

    PubMed

    2013-11-13

    This document contains final rule implementing the Paul Wellstone and Pete Domenici Mental Health Parity and Addiction Equity Act of 2008, which requires parity between mental health or substance use disorder benefits and medical/surgical benefits with respect to financial requirements and treatment limitations under group health plans and group and individual health insurance coverage. This document also contains a technical amendment relating to external review with respect to the multi-state plan program administered by the Office of Personnel Management.

  10. The Use of Spatial Data Infrastructure in Environmental Management:an Example from the Spatial Planning Practice in Poland.

    PubMed

    Zwirowicz-Rutkowska, Agnieszka; Michalik, Anna

    2016-10-01

    Today's technology plays a crucial role in the effective use of environmental information. This includes geographic information systems and infrastructures. The purpose of this research is to identify the way in which the Polish spatial data infrastructure (PSDI) supports policies and activities that may have an impact on the environment in relation to one group of users, namely urban planners, and their tasks concerning environmental management. The study is based on a survey conducted in July and August, 2014. Moreover, the authors' expert knowledge gained through urban development practice and the analysis of the environmental conservation regulations and spatial planning in Poland has been used to define the scope of environmental management in both spatial planning studies and spatial data sources. The research included assessment of data availability, infrastructure usability, and its impact on decision-making process. The results showed that the PSDI is valuable because it allows for the acquisition of data on environmental monitoring, agricultural and aquaculture facilities. It also has a positive impact on decision-making processes and improves numerous planners' activities concerning both the inclusion of environmental indicators in spatial plans and the support of nature conservation and environmental management in the process of working on future land use. However, even though the infrastructure solves certain problems with data accessibility, further improvements might be proposed. The importance of the SDI in environmental management is noticeable and could be considered from many standpoints: Data, communities engaged in policy or decision-making concerning environmental issues, and data providers. PMID:27357806

  11. The Use of Spatial Data Infrastructure in Environmental Management:an Example from the Spatial Planning Practice in Poland

    NASA Astrophysics Data System (ADS)

    Zwirowicz-Rutkowska, Agnieszka; Michalik, Anna

    2016-10-01

    Today's technology plays a crucial role in the effective use of environmental information. This includes geographic information systems and infrastructures. The purpose of this research is to identify the way in which the Polish spatial data infrastructure (PSDI) supports policies and activities that may have an impact on the environment in relation to one group of users, namely urban planners, and their tasks concerning environmental management. The study is based on a survey conducted in July and August, 2014. Moreover, the authors' expert knowledge gained through urban development practice and the analysis of the environmental conservation regulations and spatial planning in Poland has been used to define the scope of environmental management in both spatial planning studies and spatial data sources. The research included assessment of data availability, infrastructure usability, and its impact on decision-making process. The results showed that the PSDI is valuable because it allows for the acquisition of data on environmental monitoring, agricultural and aquaculture facilities. It also has a positive impact on decision-making processes and improves numerous planners' activities concerning both the inclusion of environmental indicators in spatial plans and the support of nature conservation and environmental management in the process of working on future land use. However, even though the infrastructure solves certain problems with data accessibility, further improvements might be proposed. The importance of the SDI in environmental management is noticeable and could be considered from many standpoints: Data, communities engaged in policy or decision-making concerning environmental issues, and data providers.

  12. The Use of Spatial Data Infrastructure in Environmental Management:an Example from the Spatial Planning Practice in Poland.

    PubMed

    Zwirowicz-Rutkowska, Agnieszka; Michalik, Anna

    2016-10-01

    Today's technology plays a crucial role in the effective use of environmental information. This includes geographic information systems and infrastructures. The purpose of this research is to identify the way in which the Polish spatial data infrastructure (PSDI) supports policies and activities that may have an impact on the environment in relation to one group of users, namely urban planners, and their tasks concerning environmental management. The study is based on a survey conducted in July and August, 2014. Moreover, the authors' expert knowledge gained through urban development practice and the analysis of the environmental conservation regulations and spatial planning in Poland has been used to define the scope of environmental management in both spatial planning studies and spatial data sources. The research included assessment of data availability, infrastructure usability, and its impact on decision-making process. The results showed that the PSDI is valuable because it allows for the acquisition of data on environmental monitoring, agricultural and aquaculture facilities. It also has a positive impact on decision-making processes and improves numerous planners' activities concerning both the inclusion of environmental indicators in spatial plans and the support of nature conservation and environmental management in the process of working on future land use. However, even though the infrastructure solves certain problems with data accessibility, further improvements might be proposed. The importance of the SDI in environmental management is noticeable and could be considered from many standpoints: Data, communities engaged in policy or decision-making concerning environmental issues, and data providers.

  13. Environmental effects on survival rates: robust regression, recovery planning and endangered Atlantic salmon.

    PubMed

    Bowlby, Heather D; Gibson, A Jamie F

    2015-08-01

    Describing how population-level survival rates are influenced by environmental change becomes necessary during recovery planning to identify threats that should be the focus for future remediation efforts. However, the ways in which data are analyzed have the potential to change our ecological understanding and thus subsequent recommendations for remedial actions to address threats. In regression, distributional assumptions underlying short time series of survival estimates cannot be investigated a priori and data likely contain points that do not follow the general trend (outliers) as well as contain additional variation relative to an assumed distribution (overdispersion). Using juvenile survival data from three endangered Atlantic salmon Salmo salar L. populations in response to hydrological variation, four distributions for the response were compared using lognormal and generalized linear models (GLM). The influence of outliers as well as overdispersion was investigated by comparing conclusions from robust regressions with these lognormal models and GLMs. The analyses strongly supported the use of a lognormal distribution for survival estimates (i.e., modeling the instantaneous rate of mortality as the response) and would have led to ambiguity in the identification of significant hydrological predictors as well as low overall confidence in the predicted relationships if only GLMs had been considered. However, using robust regression to evaluate the effect of additional variation and outliers in the data relative to regression assumptions resulted in a better understanding of relationships between hydrological variables and survival that could be used for population-specific recovery planning. This manuscript highlights how a systematic analysis that explicitly considers what monitoring data represent and where variation is likely to come from is required in order to draw meaningful conclusions when analyzing changes in survival relative to environmental

  14. Planning and implementing an honors degree in environmental science curricula: a case study from the University of Delaware, USA

    NASA Astrophysics Data System (ADS)

    Levia, Delphis

    2015-04-01

    Environmental degradation is undermining the sustainability of our planet. The multi-faceted nature of environmental stressors, which inherently couples human-environment interactions across space and time, necessitates that we train environmental scientists holistically within an interdisciplinary framework. Recruiting top-notch honors students to major in the environmental sciences is a critical step to ensure that we have the human capital to tackle complicated environmental problems successfully. Planning and implementing an honors degree is no trivial task. Based upon a recently completed and implemented set of programmatic revisions*, this poster showcases a successful example of an honors curriculum in environmental science to recruit and educate dynamic thinkers capable of improving the quality of our environment. The interdisciplinary environmental science program at the University of Delaware emphasizes the cross-cutting among earth's spheres through a core set of courses which employ a quantitative approach which is supplemented by several environmental policy courses. The core is coupled with six different thematic concentrations (students choose one) which permit the student to delve into a particular area of environmental science. The honors component of the degree consists of twelve additional credits. These credits are met through a specially designed introductory environmental course, a field experience requiring data collection, analysis, and write-up, a capstone course, and one other environmentally related course. The environmental sciences honors curriculum outlined in this poster may serve as a useful guide to others wishing to establish an honors program of their own in environmental science to recruit and prepare the next generation to mitigate environmental degradation. -------------- * Please note that the planning process for the environmental programs was and is the collective effort of many dedicated people. Current members of the

  15. Environmental externalities: An ASEAN application to coal-based power generation. [Association of South East Asian Nations (ASEAN)

    SciTech Connect

    Szpunar, C.B.; Gillette, J.L.

    1992-06-01

    Significant benefits to human health that result from emissions control programs may justify the costs of pollution control policies. Many scientists, economists, risk analysts, and policymakers believe that comparisons of the benefits with the costs of pollution control demonstrate that the US stationary source, air emissions control program is justified. This justification is based upon pronounced benefits to human health, especially from controlling suspended particulates and sulfur compounds. Market decisions are usually made on the basis of a consideration of traditional costs such as capital, operating and maintenance, fuel costs, and fixed charges. Social costs, which could be significant, are not incorporated explicitly into such decisions. These social costs could result in a net reduction in the welfare of individuals, and of society as a whole. Because these social costs and their effects are not represented in the price of energy, individual have no way to explicitly value them; hence, they remain unaccounted for in market decisions. By accounting for external costs, the selection of energy sources and production of energy products can lead to and equilibrium, where the total cost of energy and energy products, together with resulting social costs, can be brought to an economic minimum. The concept of an air emissions control program is of interest to the ASEAN countries (Brunei, Indonesia, Malaysia, the Philippines, Singapore, and Thailand) and their governments, especially if such a program could be justified in cost-benefit terms and shown to be directly applicable to ASEAN conditions. It is the intent of the effort described herein to demonstrate that technical options are available to control emissions from coal-based, electric power plants and that that costs of these options may be justified in cost-benefit terms.

  16. Comparison of Planned Versus Actual Dose Delivered for External Beam Accelerated Partial Breast Irradiation Using Cone-Beam CT and Deformable Registration

    SciTech Connect

    Hasan, Yasmin; Kim, Leonard; Wloch, Jennifer; Chi, Y.; Liang, J.; Martinez, Alvaro; Yan Di; Vicini, Frank

    2011-08-01

    Purpose: To assess the adequacy of dose delivery to the clinical target volume (CTV) using external beam (EB) accelerated partial breast irradiation (APBI). Methods and Materials: Sixteen patients treated with EB APBI underwent cone beam CT (CBCT) before each fraction and daily helical CT (HCT) scans to determine setup errors and calculate the dose per fraction. For 12 patients, an in-house image-intensity-based deformable registration program was used to register the HCTs to the planning CT and generate the cumulative dose. Treatment was 38.5 Gy in 10 fractions. EB APBI constraints from the National Surgical Adjuvant Breast and Bowel Project B39/Radiation Therapy Oncology Group 0413 Phase III protocol were used. Results: The mean setup error per CBCT registration was 9 {+-} 5 mm. Dose-volume histogram analysis showed only one patient (8%) with a decrease in the CTV V90 (8% underdosage). All other patients demonstrated adequate target coverage. PTV{sub E}VAL V90 was on average 3% (range, 0%-16%) less than planned. For the ipsilateral breast, four patients had an increase in V50 ({<=}1% increase) and three patients had an increase in V100 ({<=}9% increase). Only one patient showed an increase >5%. Four patients had an increase in ipsilateral lung V30 (maximum 3%), and one had an increase in heart V5 (1%). Four patients had an increase in MaxDose (maximum 89 cGy). Conclusions: The current CTV-to-PTV margin of 10 mm appears sufficient for {approx}92% of patients treated with EB APBI. Although expansion of the population PTV margin to 14 mm would provide {approx}97% confidence level for CTV coverage, online image guidance should be considered.

  17. Hanford environmental management program multi-year work plan FY1998

    SciTech Connect

    Giese, K.A.

    1997-08-25

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year`s work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ``Work Authorization`` identifies the impacted scope and requires the Contracting Officer`s or Assistant Manager-Contracting Officer`s Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ``Project Summary Section`` and Section Two is titled the ``Additional Sections at the Project Baseline Summaries Level``. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS {number_sign} RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  18. FY 1993 task plans for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D B

    1991-10-01

    The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to individuals and populations. The primary objective of work to be performed in FY 1993 is to complete the source term estimates and dose estimates for key radionuclides for the air and river pathways. At the end of FY 1993, the capability will be in place to estimate doses for individuals in the extended (32-county) study area, 1944--1991. Native American research will continue to provide input for tribal dose estimates. In FY 1993, the Technical Steering Panel (TSP) will decide whether demographic and river pathways data collection should be extended beyond FY 1993 levels. The FY 1993 work scopes and milestones in this document are based on the work plan discussed at the TSP Budget/Fiscal Subcommittee meeting on August 19--20, 1991. Table 1 shows the FY 1993 milestones; Table 2 shows estimated costs. The subsequent work scope descriptions are based on the milestones. This document and the FY 1992 task plans will form the basis for a contract with Battelle and the Centers for Disease Control (CDC). The 2-year dose reconstruction contract is expected to begin in February 1992. This contract will replace the current arrangement, whereby the US Department of Energy directly funds the Pacific Northwest Laboratory to conduct dose reconstruction work. In late FY 1992, the FY 1993 task plans will be more fully developed with detailed technical approaches, data quality objectives, and budgeted labor hours. The task plans will be updated again in July 1993 to reflect any scope, milestone, or cost changes directed during the year by the TSP. 2 tabs.

  19. Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    Not Available

    1993-09-01

    This document presents the Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG) 6 at the Oak Ridge National Laboratory (ORNL). Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and on subsequent discussions with regulators, a decision was made to defer implementing source control remedial measures at the WAG. The alternative selected to address the risks associated with WAG 6 involves maintenance of site access controls prevent public exposure to on-site contaminants, continued monitoring of contaminant releases determine if source control measures are required, and development of technologies that could support the final remediation of WAG 6. Although active source control measures are not being implemented at WAG 6, environmental monitoring is necessary to ensure that any potential changes in contaminant release from the WAG are identified early enough to take appropriate action. Two types of environmental monitoring will be conducted: baseline monitoring and annual routine monitoring. The baseline monitoring will be conducted to establish the baseline contaminant release conditions at the WAG, confirm the site-related chemicals of concern (COCs), and gather data to confirm the site hydrologic model. The baseline monitoring is expected to begin in 1994 and last for 12--18 months. The annual routine monitoring will consist of continued sampling and analyses of COCs to determine off-WAG contaminant flux and risk, identify mills in releases, and confirm the primary contributors to risk. The annual routine monitoring will continue for {approximately} 4 years after completion of the baseline monitoring.

  20. A Review on the Use of Grid-Based Boltzmann Equation Solvers for Dose Calculation in External Photon Beam Treatment Planning

    PubMed Central

    Kan, Monica W. K.; Yu, Peter K. N.; Leung, Lucullus H. T.

    2013-01-01

    Deterministic linear Boltzmann transport equation (D-LBTE) solvers have recently been developed, and one of the latest available software codes, Acuros XB, has been implemented in a commercial treatment planning system for radiotherapy photon beam dose calculation. One of the major limitations of most commercially available model-based algorithms for photon dose calculation is the ability to account for the effect of electron transport. This induces some errors in patient dose calculations, especially near heterogeneous interfaces between low and high density media such as tissue/lung interfaces. D-LBTE solvers have a high potential of producing accurate dose distributions in and near heterogeneous media in the human body. Extensive previous investigations have proved that D-LBTE solvers were able to produce comparable dose calculation accuracy as Monte Carlo methods with a reasonable speed good enough for clinical use. The current paper reviews the dosimetric evaluations of D-LBTE solvers for external beam photon radiotherapy. This content summarizes and discusses dosimetric validations for D-LBTE solvers in both homogeneous and heterogeneous media under different circumstances and also the clinical impact on various diseases due to the conversion of dose calculation from a conventional convolution/superposition algorithm to a recently released D-LBTE solver. PMID:24066294