Sample records for planning implementation monitoring

  1. Putting Adaptive Management into Monitoring: Retrospective and Prospective Views of Northwest Forest Plan Monitoring

    Treesearch

    David E. Busch; Jon R. Martin

    2006-01-01

    Based on ten years of Northwest Forest Plan implementation, we focus on key scientifically-oriented questions relating to improving Plan monitoring. The questions, which fall into groups concerning issues of scale, integration, and efficiency, have applicability to monitoring programs being designed and implemented throughout the world. Progress toward answering such...

  2. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  3. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  4. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  5. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  6. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  7. Web Based GIS System For Monitoring the Implementation of County Integrated Development Plan a Case Study of Nandi County, Kenya.

    NASA Astrophysics Data System (ADS)

    Kurui, P. K.; Mutua, F.

    2016-12-01

    The paper seek to propose a conceptual framework of a way of monitoring and evaluating the implementation of the projects listed in the county integrated development plan by applying the use of the geospatial technologies with the focus being developing a web based GIS system in which the public can be able to track and monitor the progress of implementation of the projects in various parts of the county , although the guidelines developed by the ministry of devolution provides for the inclusion of the implementation monitoring and evaluation framework specifying projects to be implemented during the plan period and specification of veriable indicators it does not provide mechanisms for public participation during implementation and monitoring stage. This calls for a system that the public can interact with. The web based GIS system has been developed using the free open source softwares. Development projects have been categorized into; ongoing, completed and planned It can also be shown that a web based GIS system can be used as an important tool for monitoring the implementation of the CIDP due to its easy to use nature and supported by the fact that internet is easily accessed by the majority of the public making it a powerful tool for public participation.

  8. 75 FR 18782 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ...EPA is proposing to approve a revision to Indiana's State Implementation Plan alternative monitoring requirements for Indianapolis Power and Light Company (IPL) at its Harding Street Generating Station. On December 31, 2008, Indiana requested approval of alternative monitoring requirements that allow the use of a particulate matter continuous emissions monitoring system in place of a continuous opacity monitor.

  9. 6. Monitoring and the Northwest Forest Plan

    Treesearch

    Leslie M. Reid

    1994-01-01

    Abstract - Monitoring will ensure that the Northwest Forest Plan is implemented as intended, determine whether the plan is achieving its intended objectives, and provide information needed to improve the plan. The credibility of the Forest Plan rests on the credibility of its monitoring program. If the monitoring program is to succeed, it must focus on well-defined...

  10. 50 CFR 216.175 - Requirements for monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management... subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for standardizing data... Report—The Navy shall submit a report annually on October 1 describing the implementation and results...

  11. Educational Technology, E.C.I.A. Chapter 2. Final Evaluation Report.

    ERIC Educational Resources Information Center

    District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.

    The Planning, Monitoring and Implementing (PMI) Evaluation Model for Decision-Making was used by the District of Columbia Public Schools to monitor their Office of Educational Technology in its efforts to provide direction and coordination for computer related activities, and to plan and implement educational television projects in math and…

  12. Section summary: Institutional context, drivers and detectability in REDD+ implementation

    Treesearch

    Patricia Manley

    2013-01-01

    REDD+ and Forest DegradationREDD+ implementation requires two key steps: (1) establish a reference emission level or reference level (RL); and (2) monitor performance against the reference level (RL). A monitoring system must be able to monitor the performance of implementing action plans to reduce emissions....

  13. Implementing AIM-based monitoring for natural resource management

    USDA-ARS?s Scientific Manuscript database

    Successful monitoring programs are built on clearly-defined objectives, thorough planning, and organized implementation. However, natural resource management decisions need to be made at many different organizational levels and scales – from local to national. Developing separate monitoring programs...

  14. Action Research to Support the Sustainability of Strategic Planning

    ERIC Educational Resources Information Center

    Antheil, Jane H.; Spinelli, Stephen, Jr.

    2011-01-01

    This article suggests that developing a strategic plan, even through a highly participative and data-driven process, is not sufficient to sustain change if implementation of the plan is not monitored as an organizational change event. To the degree that a strategic plan is institutionally transformative, monitoring change during implementation…

  15. Preparation of regional shorebird monitoring plans

    Treesearch

    Jonathan Bart; Ann Manning; Susan Thomas; Catherine Wightman

    2005-01-01

    Shorebird monitoring programs in Canada and the United States are being developed under the auspices of PRISM, the Program for Regional and International Shorebird Monitoring. PRISM provides a single blueprint for implementing the monitoring proposals in the shorebird conservation plans prepared recently in Canada and the United States. It includes four segments:...

  16. Designing monitoring programs in an adaptive management context for regional multiple species conservation plans

    USGS Publications Warehouse

    Atkinson, A.J.; Trenham, P.C.; Fisher, R.N.; Hathaway, S.A.; Johnson, B.S.; Torres, S.G.; Moore, Y.C.

    2004-01-01

    critical management uncertainties; and 3) implementing long-term monitoring and adaptive management. Ultimately, the success of regional conservation planning depends on the ability of monitoring programs to confront the challenges of adaptively managing and monitoring complex ecosystems and diverse arrays of sensitive species.

  17. A Planning Approach for Developing Inventory and Monitoring Programs In National Parks

    Treesearch

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    This document offers some conceptual ideas on how individual parks could plan and implement an Inventory and Monitoring (I&M) program. In several respects, the authors ideas parallel and complement the I&M project planning and development process outlined in the Natural Resources Inventory and Monitoring Guideline (NPS-75). However, no universal techniques...

  18. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... documenting the implementation of the AFHM plan, including sales or rental reports, as required by the...'s reports. Each sales or rental report shall be reviewed by the monitoring office as it is received. When sales or rental reports show that 20% of the units covered by the AFHM plan have been sold or...

  19. Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.

    Treesearch

    Jonathan Thompson

    2007-01-01

    The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoring—the systematic observation and measurement of a set...

  20. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells grantedmore » “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.« less

  1. Developing and Monitoring Individual Education Plans for Handicapped Children.

    ERIC Educational Resources Information Center

    Armstrong, Mary Lee

    The practicum was designed to develop, implement, monitor, and evaluate a management system for developing and monitoring individual education plans (IEPs) for handicapped children as mandated by P.L. 94-142, the Education for All Handicapped Children Act. The products included an expectancy formula for educable mentally retarded (EMR) and…

  2. 42 CFR 460.106 - Plan of care.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Services § 460.106 Plan of care. (a) Basic requirement. The interdisciplinary team must promptly develop a... outcomes to be achieved. (c) Implementation of the plan of care. (1) The team must implement, coordinate...) The team must continuously monitor the participant's health and psychosocial status, as well as the...

  3. 42 CFR 460.106 - Plan of care.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Services § 460.106 Plan of care. (a) Basic requirement. The interdisciplinary team must promptly develop a... outcomes to be achieved. (c) Implementation of the plan of care. (1) The team must implement, coordinate...) The team must continuously monitor the participant's health and psychosocial status, as well as the...

  4. Volunteer water monitoring: A guide for state managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-08-01

    Contents: executive summary; volunteers in water monitoring; planning a volunteer monitoring program; implementing a volunteer monitoring program; providing credible information; costs and funding; and descriptions of five successful programs.

  5. 78 FR 14226 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-05

    ... groundfish sector to request exemptions from Federal fishing regulations through its annual operations plan... rule implementing the annual sector operations plans. However, sectors can request exemptions at any...-funded at-sea monitoring program will be required to develop a monitoring plan as part of its operation...

  6. 40 CFR 469.13 - Monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...

  7. 40 CFR 469.13 - Monitoring.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...

  8. 40 CFR 469.13 - Monitoring.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of my knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has... implementing the solvent management plan submitted to the permitting authority.” (b) In requesting that no monitoring of TTO be required, the direct discharger shall submit a solvent management plan that specifies to...

  9. Using iKidTools™ Software Support Systems to Develop and Implement Self-Monitoring Interventions

    ERIC Educational Resources Information Center

    Patti, Angela L.; Miller, Kevin J.

    2011-01-01

    Educational teams often are faced with the task of developing and implementing Behavioral Intervention Plans (BIPs) for students who present challenging and/or disruptive behaviors. This article describes the steps used to develop and implement a self-monitoring BIP that incorporated an innovative software system, iKidTools™. An authentic case…

  10. 40 CFR 413.03 - Monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... standard for total toxic organics (TTO), I certify that, to the best of my knowledge and belief, no dumping... monitoring report. I further certify that this facility is implementing the toxic organic management plan... POTWs shall submit a toxic organic management plan that specifies to the control authority's...

  11. LEAD SAFE YARDS: DEVELOPING AND IMPLEMENTING A MONITORING, ASSESSMENT, AND OUTREACH PROGRAM FOR YOUR COMMUNITY

    EPA Science Inventory

    The USEPA has developed a technology transfer handbook on how to plan and implement a residential soil lead monitoring, assessment, mitigation and outreach program for residential communities. The handbook provides guidance on 1) identifying potentially impacted communities, 2) c...

  12. Toward implementation of a national ground water monitoring network

    USGS Publications Warehouse

    Schreiber, Robert P.; Cunningham, William L.; Copeland, Rick; Frederick, Kevin D.

    2008-01-01

    The Federal Advisory Committee on Water Information's (ACWI) Subcommittee on Ground Water (SOGW) has been working steadily to develop and encourage implementation of a nationwide, long-term ground-water quantity and quality monitoring framework. Significant progress includes the planned submission this fall of a draft framework document to the full committee. The document will include recommendations for implementation of the network and continued acknowledgment at the federal and state level of ACWI's potential role in national monitoring toward an improved assessment of the nation's water reserves. The SOGW mission includes addressing several issues regarding network design, as well as developing plans for concept testing, evaluation of costs and benefits, and encouraging the movement from pilot-test results to full-scale implementation within a reasonable time period. With the recent attention to water resource sustainability driven by severe droughts, concerns over global warming effects, and persistent water supply problems, the SOGW mission is now even more critical.

  13. Improving Implementation of Function-Based Interventions: Self-Monitoring, Data Collection, and Data Review

    ERIC Educational Resources Information Center

    Pinkelman, Sarah E.; Horner, Robert H.

    2017-01-01

    The success of function-based interventions depends not just on the quality of procedures but also on the extent to which procedures are implemented as planned. Too often in schools, effort is committed to functional assessment and behavior support plan design, only to be followed by weak implementation. This study used a multiple baseline across…

  14. 77 FR 20217 - Secondary National Ambient Air Quality Standards for Oxides of Nitrogen and Sulfur

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-03

    ... Planning and Standards (OAQPS), U.S. Environmental Protection Agency, Mail Code C504-06, Research Triangle... of Research 3. Implementation Challenges 4. Monitoring Plan Development and Stakeholder Participation B. Summary of Proposed Evaluation of Monitoring Methods C. Comments on Field Pilot Program and...

  15. 75 FR 54773 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    .... Monitoring Network and Verification of Continued Attainment 4. Contingency Plan 5. Conformity Determination... Continued Attainment, Contingency Plan, and Conformity Determinations Under Limited Maintenance Plans. These.../Verification of Continued Attainment, Contingency Plan, and Conformity Determination Under Limited Maintenance...

  16. How do we know how many salmon returned to spawn? Implementing the California Coastal salmonid monitoring plan in Mendocino County, California

    Treesearch

    Sean P. Gallagher; David W. Wright

    2012-01-01

    California's coastal salmon and steelhead populations are listed under California and Federal Endangered Species Acts; both require monitoring to provide measures of recovery. Since 2004 the California Department of Fish and Game and NOAA Fisheries have been developing a monitoring plan for California¡¯s coastal salmonids (the California Coastal Salmonid...

  17. User manual and spreadsheet tool for implementing performance planning for rural planning organizations.

    DOT National Transportation Integrated Search

    2017-03-01

    The performance-planning tool developed as part of this project is intended for use with the guidebook for establishing and using rural performance based transportation system assessment, monitoring, planning, and programming to support the rural pla...

  18. 40 CFR 63.653 - Monitoring, recordkeeping, and implementation plan for emissions averaging.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 63.120 of subpart G; and (ii) For closed vent systems with control devices, conduct an initial design..., monitoring, recordkeeping, and reporting equivalent to that required for Group 1 emission points complying... control device. (2) The source shall implement the following procedures for each miscellaneous process...

  19. Incorporating gender, equity, and human rights into the action planning process: moving from rhetoric to action

    PubMed Central

    Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April

    2016-01-01

    Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations. PMID:27606968

  20. Incorporating genetic sampling in long-term monitoring and adaptive management in the San Diego County Management Strategic Plan Area, Southern California

    USGS Publications Warehouse

    Vandergast, Amy G.

    2017-06-02

    Habitat and species conservation plans usually rely on monitoring to assess progress towards conservation goals. Southern California, USA, is a hotspot of biodiversity and home to many federally endangered and threatened species. Here, several regional multi-species conservation plans have been implemented to balance development and conservation goals, including in San Diego County. In the San Diego County Management Strategic Plan Area (MSPA), a monitoring framework for the preserve system has been developed with a focus on species monitoring, vegetation monitoring, threats monitoring and abiotic monitoring. Genetic sampling over time (genetic monitoring) has proven useful in gathering species presence and abundance data and detecting population trends, particularly related to species and threats monitoring objectives. This report reviews genetic concepts and techniques of genetics that relate to monitoring goals and outlines components of a genetic monitoring scheme that could be applied in San Diego or in other monitoring frameworks throughout the Nation.

  1. 78 FR 54173 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Maintenance Plan Update...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... direct final rule in the Federal Register informing the public that the rule will not take effect... maintenance period, a commitment to maintain the existing monitoring network, factors and procedures to be... Network Indiana currently operates two SO 2 monitors in Lake County, Indiana. Indiana has committed to...

  2. Improving the implementation of marine monitoring in the northeast Atlantic.

    PubMed

    Turrell, W R

    2018-03-01

    Marine monitoring in the northeast Atlantic is delivered within identifiable monitoring themes, established through time and defined by the geographical area and policy drivers they serve, the sampling methodologies they use, their assessment methodologies, their funding and governance structures and the people or organisations involved in their implementation. Within a monitoring theme, essential components for effective monitoring are governance, strategy and work plan, sampling protocols, quality assurance, and data and assessment structures. This simple framework is used to analyse two monitoring theme case studies; national ecosystem health monitoring, and regional fish stock monitoring. Such essential component analyses, within marine monitoring themes, can help improve monitoring implementation by identifying gaps and overlaps. Once monitoring themes are recognised, explicitly defined and streamlined, travel towards integrated monitoring may be made easier as the current lack of clarity in thematic marine monitoring implementation is one barrier to integration at both national and regional scales. Copyright © 2018 The Author. Published by Elsevier Ltd.. All rights reserved.

  3. Quality of life of coronary artery disease patients after the implementation of planning strategies for medication adherence 1

    PubMed Central

    Lourenço, Laura Bacelar de Araujo; Rodrigues, Roberta Cunha Matheus; São-João, Thaís Moreira; Gallani, Maria Cecilia; Cornélio, Marilia Estevam

    2015-01-01

    OBJECTIVE: to compare the general and specific health-related quality of life (HRQoL) between the Intervention (IG) and Control (CG) groups of coronary artery disease patients after the implementation of Action Planning and Coping Planning strategies for medication adherence and to verify the relationship between adherence and HRQoL. METHOD: this was a controlled and randomized study. RESULTS: the sample (n=115) was randomized into two groups, IG (n=59) and CG (n=56). Measures of medication adherence and general and specific HRQoL were obtained in the baseline and after two months of monitoring. CONCLUSION: the findings showed that the combination of intervention strategies - Action Planning and Coping Planning for medication adherence did not affect the HRQoL of coronary artery disease patients in outpatient monitoring. PMID:25806626

  4. An active monitoring method for flood events

    NASA Astrophysics Data System (ADS)

    Chen, Zeqiang; Chen, Nengcheng; Du, Wenying; Gong, Jianya

    2018-07-01

    Timely and active detecting and monitoring of a flood event are critical for a quick response, effective decision-making and disaster reduction. To achieve the purpose, this paper proposes an active service framework for flood monitoring based on Sensor Web services and an active model for the concrete implementation of the active service framework. The framework consists of two core components-active warning and active planning. The active warning component is based on a publish-subscribe mechanism implemented by the Sensor Event Service. The active planning component employs the Sensor Planning Service to control the execution of the schemes and models and plans the model input data. The active model, called SMDSA, defines the quantitative calculation method for five elements, scheme, model, data, sensor, and auxiliary information, as well as their associations. Experimental monitoring of the Liangzi Lake flood in the summer of 2010 is conducted to test the proposed framework and model. The results show that 1) the proposed active service framework is efficient for timely and automated flood monitoring. 2) The active model, SMDSA, is a quantitative calculation method used to monitor floods from manual intervention to automatic computation. 3) As much preliminary work as possible should be done to take full advantage of the active service framework and the active model.

  5. 33 CFR 332.6 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...., forested wetlands, bogs). Following project implementation, the district engineer may reduce or waive the... performance standards, and may include plans (such as as-built plans), maps, and photographs to illustrate...

  6. 77 FR 44146 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Iron and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... taking direct final action to approve revisions to the Maryland State Implementation Plan (SIP) submitted... steelmaking facility (Sparrows Point) is the only sintering plant located in the State of Maryland. The... emissions of particulate matter, continuously monitoring compliance with specified pressure drop and flow...

  7. Enterprise Resource Planning Systems: Assessment of Risk Factors by California Community College Leaders

    ERIC Educational Resources Information Center

    Valente, Mario Manuel

    2011-01-01

    Most California Community Colleges have chosen to purchase and implement a Management Information Systems software solution also known as an Enterprise Resource Planning (ERP) system in order to monitor, control, and automate their administrative tasks. ERP implementations are complex, expensive, high profile, and therefore high risk. To reduce…

  8. 40 CFR 51.190 - Ambient air quality monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...

  9. 40 CFR 51.190 - Ambient air quality monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...

  10. 40 CFR 51.190 - Ambient air quality monitoring requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...

  11. 40 CFR 51.190 - Ambient air quality monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...

  12. 40 CFR 51.190 - Ambient air quality monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Ambient air quality monitoring... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Ambient Air Quality Surveillance § 51.190 Ambient air quality monitoring requirements. The requirements for monitoring ambient air...

  13. DEVELOPING AND IMPLEMENTING A BIRD MIGRATION MONITORING, ASSESSMENT AND PUBLIC OUTREACH PROGRAM FOR YOUR COMMUNITY - THE BIRDCAST PROJECT

    EPA Science Inventory

    The USEPA has developed a technology transfer handbook for the EMPACt BirdCast bird migration monitoring project. The document is essentially a "How-To" Handbook that addresses the planning and implementation steps that were needed to develop, operate and maintain a program simil...

  14. Monitoring and Evaluating Nonpoint Source Watershed Projects

    EPA Pesticide Factsheets

    This guide is written primarily for those who develop and implement monitoring plans for watershed management projects. it can also be used evaluate the technical merits of monitoring proposals they might sponsor. It is an update to the 1997 Guide.

  15. Monitoring the Effective and Efficient Use of Land: The English Approach

    NASA Astrophysics Data System (ADS)

    Ganser, Robin

    In England quantified targets for the reuse of brownfields and of existing buildings place particular requirements on the planning system as part of the overall strategy to make effective use of natural resources. Achieving these targets is not free of obstacles and potential conflicts. Therefore monitoring of policy implementation is a necessity in the planning system.

  16. Learning about the Effects of Development Education Programmes: Strengthening Planning, Monitoring, and Evaluation (PME) through Reflective Practice

    ERIC Educational Resources Information Center

    Van Ongevalle, Jan; Huyse, Huib; Van Petegem, Peter

    2013-01-01

    This article reports on the results of an action research project (2010-13) in which ten Belgian organizations who implement development education programmes explored different planning, monitoring, and evaluation (PME) approaches with the aim of learning more effectively about their results. PME approaches piloted included outcome mapping, most…

  17. District Computer Concerns: Checklist for Monitoring Instructional Use of Computers.

    ERIC Educational Resources Information Center

    Coe, Merilyn

    Designed to assist those involved with planning, organizing, and implementing computer use in schools, this checklist can be applied to: (1) assess the present state of instructional computer use in the district; (2) assist with the development of plans or guidelines for computer use; (3) support a start-up phase; and (4) monitor the…

  18. NCCN Mountain Lakes Monitoring Strategy: Guidelines to Resolution

    USGS Publications Warehouse

    Hoffman, Robert L.; Huff, Mark H.

    2008-01-01

    The North Coast and Cascades Network (NCCN) Inventory and Monitoring Program provides funds to its Network Parks to plan and implement the goals and objectives of the National Park Services? (NPS) Inventory and Monitoring (I&M) Program. The primary purpose of the I&M program is to develop and implement a long-term monitoring program in each network. The purpose of this document is to describe the outcome of a meeting held to find solutions to obstacles inhibiting development of a unified core design and methodology for mountain lake monitoring.

  19. Execution monitoring for a mobile robot system

    NASA Technical Reports Server (NTRS)

    Miller, David P.

    1990-01-01

    Due to sensor errors, uncertainty, incomplete knowledge, and a dynamic world, robot plans will not always be executed exactly as planned. This paper describes an implemented robot planning system that enhances the traditional sense-think-act cycle in ways that allow the robot system monitor its behavior and react in emergencies in real-time. A proposal on how robot systems can completely break away from the traditional three-step cycle is also made.

  20. Challenges experienced by nurses in the implementation of a healthcare reform plan in Iran.

    PubMed

    Salarvand, Shahin; Azizimalekabadi, Maryam; Jebeli, Azadeh Akbari; Nazer, Mohamadreza

    2017-04-01

    The Healthcare Reform Plan is counted as a plan for improving healthcare services in Iran. Undoubtedly pros and cons can be seen either in plan or implementation. This study was conducted to describe nurses' challenges in implementing healthcare reform in Iran. A qualitative method centered upon conventional content analysis was applied. We used purposive sampling and data saturation was obtained by 30 participants. Data were analyzed using MAXQDA software. Challenges experienced by nurses in the implementation of this reform include; unsuitable infrastructure, unfavorable vision, a complicated challenge, the necessity of monitoring, control plan outcomes, the impact on nurses, people's misconceptions and solutions. The Healthcare Reform Plan in Iran is a solution to establish equality in the health system, however, to eliminate these challenges, revision and appropriate foundation of infrastructures is called for.

  1. The Effects of Self-Monitoring and Performance Feedback on the Treatment Integrity of Behavior Intervention Plan Implementation and Generalization

    ERIC Educational Resources Information Center

    Mouzakitis, Angela; Codding, Robin S.; Tryon, Georgiana

    2015-01-01

    Accurate implementation of individualized behavior intervention plans (BIPs) is a critical aspect of evidence-based practice. Research demonstrates that neither training nor consultation is sufficient to improve and maintain high rates of treatment integrity (TI). Therefore, evaluation of ongoing support strategies is needed. The purpose of this…

  2. Ecosystem restoration: Chapter 4

    USGS Publications Warehouse

    Cullinane Thomas, Catherine M.; Skrabis, K. E.; Gascoigne, William

    2012-01-01

    The Department of the Interior extensively supports―through its mission, policy, programs, and funding― the study, planning, implementation, and monitoring of ecosystem restoration. This commitment is reflected in the Department's FY2011-2016 Strategic Plan.

  3. ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM: AGROECOSYSTEM 1992 PILOT PLAN

    EPA Science Inventory

    The Agroecosystem Resource Group (ARG) of the Environmental Protection Monitoring and Assessment Program (EMAP) has developed a five year program strategy for implementation of a suite of indicators for monitoring agroecosystem status and trends. he five-year period (1991-1995) i...

  4. Monitoring HIV and AIDS Related Policy Reforms: A Road Map to Strengthen Policy Monitoring and Implementation in PEPFAR Partner Countries

    PubMed Central

    2016-01-01

    Achieving an AIDS-free generation will require the adoption and implementation of critical health policy reforms. However, countries with high HIV burden often have low policy development, advocacy, and monitoring capacity. This lack of capacity may be a significant barrier to achieving the AIDS-free generation goals. This manuscript describes the increased focus on policy development and implementation by the United States President’s Emergency Plan for AIDS Relief (PEPFAR). It evaluates the curriculum and learning modalities used for two regional policy capacity building workshops organized around the PEPFAR Partnership Framework agreements and the Road Map for Monitoring and Implementing Policy Reforms. A total of 64 participants representing the U.S. Government, partner country governments, and civil society organizations attended the workshops. On average, participants responded that their policy monitoring skills improved and that they felt they were better prepared to monitor policy reforms three months after the workshop. When followed-up regarding utilization of the Road Map action plan, responses were mixed. Reasons cited for not making progress included an inability to meet or a lack of time, personnel, or governmental support. This lack of progress may point to a need for building policy monitoring systems in high HIV burden countries. Because the success of policy reforms cannot be measured by the mere adoption of written policy documents, monitoring the implementation of policy reforms and evaluating their public health impact is essential. In many high HIV burden countries, policy development and monitoring capacity remains weak. This lack of capacity could hinder efforts to achieve the ambitious AIDS-free generation treatment, care and prevention goals. The Road Map appears to be a useful tool for strengthening these critical capacities. PMID:26914708

  5. Reducing fat intake using implementation intentions: A meta-analytic review.

    PubMed

    Vilà, Irene; Carrero, Isabel; Redondo, Raquel

    2017-05-01

    To study the efficacy of forming implementation intentions for fat intake reduction as well as possible moderating variables. Systematic review and meta-analysis of 12 empirical studies (N = 3,323) published in English and Spanish in the Web of Science (Core Collection) and MEDLINE (1990-January 2016) databases. This study found that the efficacy of planning interventions on fat consumption reduction was higher than expected, as a moderate overall effect of implementation intentions was observed (d = 0.488). Moreover, planning for a fat intake reduction seems to be more powerful for men than for women (β = -.623; p = .025) and in cases where there is no monitoring during the intervention (d = 0.671 vs. d = 0.231). Previous research was sceptical of the efficacy of planning in the case of avoiding goals in healthy eating. However, our results show that planning is an efficient intervention that can be used by health education programmes to reduce fat intake and, therefore, increase citizen well-being. These results also support the existence of a key variable in the implementation intentions process, that is, goal complexity, and the presence of two moderating variables, that is, gender and monitoring. Statement of contribution What is already known on this subject? Implementation intentions are action plans subordinate to goal intentions that specify the 'when, where, and how' of responses leading to goal attainment. In healthy eating, the average effect of forming implementation intentions is small to medium, but this efficacy changes depending on the type of intended behaviour. Past evidence shows that the effect size seems to be lower when the intervention aims at reducing unhealthy behaviours versus promoting healthy behaviours. What does this study add? Forming implementation intentions is an efficient intervention to reduce fat intake with a medium overall effect. The efficacy of this intervention is increased when men are targeted and when there is no monitoring during the process. This study introduces a new line of research focused on the study of the effect of planning on complex goals. © 2017 The British Psychological Society.

  6. Challenges experienced by nurses in the implementation of a healthcare reform plan in Iran

    PubMed Central

    Salarvand, Shahin; Azizimalekabadi, Maryam; Jebeli, Azadeh Akbari; Nazer, Mohamadreza

    2017-01-01

    Introduction The Healthcare Reform Plan is counted as a plan for improving healthcare services in Iran. Undoubtedly pros and cons can be seen either in plan or implementation. This study was conducted to describe nurses’ challenges in implementing healthcare reform in Iran. Methods A qualitative method centered upon conventional content analysis was applied. We used purposive sampling and data saturation was obtained by 30 participants. Data were analyzed using MAXQDA software. Results Challenges experienced by nurses in the implementation of this reform include; unsuitable infrastructure, unfavorable vision, a complicated challenge, the necessity of monitoring, control plan outcomes, the impact on nurses, people’s misconceptions and solutions. Conclusions The Healthcare Reform Plan in Iran is a solution to establish equality in the health system, however, to eliminate these challenges, revision and appropriate foundation of infrastructures is called for. PMID:28607646

  7. Report: EPA Plans for Managing Counter Terrorism/ Emergency Response Equipment and Protecting Critical Assets Not Fully Implemented

    EPA Pesticide Factsheets

    Report #09-P-0087, January 27, 2009. EPA has progressed in implementing the counter terrorism/emergency response (CT/ER) initiatives, but is behind schedule in implementing the Radiation Ambient Monitoring (RadNet) System.

  8. ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM - AGROECOSYSTEM PILOT FIELD PROGRAM PLAN - 1993

    EPA Science Inventory

    The Agroecosystem Resource Group (ARG) of the Environmental Monitoring and Assessment Program (EMAP) has developed a five-year (1991-1995) strategy for the development, evaluation, and implementation of a suite of indicators for monitoring agroecosystem status and trends on a reg...

  9. 40 CFR 49.10711 - Federal Implementation Plan for the Astaris-Idaho LLC Facility (formerly owned by FMC Corporation...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... section, consistent with any averaging period specified for averaging the results of monitoring. Fugitive... beneficial. Monitoring malfunction means any sudden, infrequent, not reasonably preventable failure of the monitoring to provide valid data. Monitoring failures that are caused in part by poor maintenance or careless...

  10. 40 CFR 49.10711 - Federal Implementation Plan for the Astaris-Idaho LLC Facility (formerly owned by FMC Corporation...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... section, consistent with any averaging period specified for averaging the results of monitoring. Fugitive... beneficial. Monitoring malfunction means any sudden, infrequent, not reasonably preventable failure of the monitoring to provide valid data. Monitoring failures that are caused in part by poor maintenance or careless...

  11. 76 FR 56694 - Approval and Promulgation of Air Quality Implementation Plans; California; Determinations of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    ... ambient air quality monitoring data for the period preceding the applicable attainment deadline. DATES... and certified monitoring data. A violation occurs when the ambient ozone air quality monitoring data... standard, generally based on air quality monitoring data from the 1987 through 1989 period (section 107(d...

  12. 76 FR 28696 - Approval and Promulgation of Air Quality Implementation Plans; California; Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... based on complete, quality-assured and certified ambient air quality monitoring data for 2007-2009... certain air quality monitoring data because they meet the criteria for ozone exceptional events that are... certified monitoring data. A violation occurs when the ambient ozone air quality monitoring data show...

  13. KCBX Quality Assurance Project Plan - October 2014

    EPA Pesticide Factsheets

    This revised plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring by URS Corporation at the KCBX Terminals Company North and South Terminals in Chicago, Ill.

  14. KCBX Quality Assurance Project Plan - February 2014

    EPA Pesticide Factsheets

    This plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring, by URS Corporation, at the KCBX Terminals Company North and South Terminals in Chicago, IL.

  15. Revised ground-water monitoring compliance plan for the 300 area process trenches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less

  16. Evaluating barnyard Best Management Practices in Wisconsin using upstream-downstream monitoring

    USGS Publications Warehouse

    Stuntebeck, Todd D.

    1995-01-01

    The Nonpoint Source Water Pollution Abatement Program was created in 1978 by the Wisconsin Legislature. The goal of the program is to improve and protect the water quality of lakes, streams, wetlands, and ground water within selected priority watersheds by controlling sources of nonpoint pollution. For each selected watershed, the Wisconsin Department of Natural Resources drafts a management plan that guides the implementation of pollution-control strategies known as Best Management Practices (BMP's). This plan summarizes resource and land-use inventories, describes the results of pollution-source modeling, and suggests pollution reduction goals. The U.S. Geological Survey, through a cooperative effort with the Wisconsin Department of Natural Resources, is monitoring water-quality improvements that result from the implementation of BMP's. The data collected are then compared to the watershed plans to assess progress and determine whether goals are being realized. This fact sheet describes the data-collection efforts, preliminary results, and planned data-analysis techniques of monitoring projects for pre-BMP conditions at two barnyards, one each on Otter Creek and Halfway Prairie Creek.

  17. A Strategic Plan for Introducing, Implementing, Managing, and Monitoring an Urban Extension Platform

    ERIC Educational Resources Information Center

    Warner, Laura A.; Vavrina, Charlie S.; Campbell, Mary L.; Elliott, Monica L.; Northrop, Robert J.; Place, Nick T.

    2017-01-01

    Florida's Strategic Plan for Extension in Metropolitan Regions reflects an adaptive management approach to the state's urban Extension mission within the context of establishing essential elements, performance indicators, key outcomes, and suggested alternatives for action. Extension leadership has adopted the strategic plan, and implementation…

  18. 76 FR 43906 - Approval and Promulgation of State Implementation Plan Revisions; Infrastructure Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... emissions inventories, monitoring, and modeling, to assure attainment and maintenance of the standards... NAAQS required the deployment of a system of new monitors to measure ambient levels of that new... requirements, including emissions inventories, monitoring, and modeling to assure attainment and maintenance of...

  19. 40 CFR 96.71 - Initial certification and recertification procedures

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... STATE IMPLEMENTATION PLANS Monitoring and Reporting § 96.71 Initial certification and recertification... the low mass emissions excepted monitoring methodology under § 75.19 shall also meet the requirements... alternative monitoring system under subpart E of part 75 of this chapter shall also meet the requirements of...

  20. 40 CFR 96.71 - Initial certification and recertification procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... STATE IMPLEMENTATION PLANS Monitoring and Reporting § 96.71 Initial certification and recertification... the low mass emissions excepted monitoring methodology under § 75.19 shall also meet the requirements... alternative monitoring system under subpart E of part 75 of this chapter shall also meet the requirements of...

  1. 40 CFR 96.71 - Initial certification and recertification procedures

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STATE IMPLEMENTATION PLANS Monitoring and Reporting § 96.71 Initial certification and recertification... the low mass emissions excepted monitoring methodology under § 75.19 shall also meet the requirements... alternative monitoring system under subpart E of part 75 of this chapter shall also meet the requirements of...

  2. 40 CFR 96.71 - Initial certification and recertification procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... STATE IMPLEMENTATION PLANS Monitoring and Reporting § 96.71 Initial certification and recertification... the low mass emissions excepted monitoring methodology under § 75.19 shall also meet the requirements... alternative monitoring system under subpart E of part 75 of this chapter shall also meet the requirements of...

  3. Circumpolar Biodiversity Monitoring Programme coastal biodiversity monitoring background paper

    USGS Publications Warehouse

    McLennan, Donald; Anderson, Rebecca D.; Wegeberg, S.; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, S.; Markon, Carl J.; Christensen, T.; Barry, T.; Price, C.

    2016-01-01

    In 2014, the United States (U.S.) and Canada agreed to act as co-lead countries for the initial development of the Coastal Expert Monitoring Group (CEMG) as part of the Circumpolar Biodiversity Monitoring Program (CBMP, www. cbmp.is) under the Arctic Council’s Conservation of Arctic Flora and Fauna (CAFF, www.caff.is) working group. The CAFF Management Board approved Terms of Reference for the CEMG in the spring of 2014. The primary goal of the CEMG is to develop a long term, integrated, multi-disciplinary, circumpolar Arctic Coastal Biodiversity Monitoring Plan (the Coastal Plan) that relies on science and Traditional Knowledge, and has direct and relevant application for communities, industry, government decision makers, and other users. In addition to the monitoring plan, the CAFF working group has asked the CBMP, and thus the CEMG, to develop an implementation plan that identifies timeline, costs, organizational structure and partners. This background paper provides a platform for the guidance for the development of the Coastal Plan and is produced by the CEMG with assistance from a number of experts in multiple countries.

  4. 77 FR 43196 - Approval and Promulgation of Implementation Plans; North Carolina; 110(a)(1) and (2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... quality monitoring/data system: NCAC 2D.0600, Monitoring, and 2D.0806, Ambient Monitoring and Modeling... protected. The www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will not know... requirements, including emissions inventories, monitoring, and modeling to assure attainment and maintenance of...

  5. A strategic approach for Water Safety Plans implementation in Portugal.

    PubMed

    Vieira, Jose M P

    2011-03-01

    Effective risk assessment and risk management approaches in public drinking water systems can benefit from a systematic process for hazards identification and effective management control based on the Water Safety Plan (WSP) concept. Good results from WSP development and implementation in a small number of Portuguese water utilities have shown that a more ambitious nationwide strategic approach to disseminate this methodology is needed. However, the establishment of strategic frameworks for systematic and organic scaling-up of WSP implementation at a national level requires major constraints to be overcome: lack of legislation and policies and the need for appropriate monitoring tools. This study presents a framework to inform future policy making by understanding the key constraints and needs related to institutional, organizational and research issues for WSP development and implementation in Portugal. This methodological contribution for WSP implementation can be replicated at a global scale. National health authorities and the Regulator may promote changes in legislation and policies. Independent global monitoring and benchmarking are adequate tools for measuring the progress over time and for comparing the performance of water utilities. Water utilities self-assessment must include performance improvement, operational monitoring and verification. Research and education and resources dissemination ensure knowledge acquisition and transfer.

  6. Structure, Intent and Conformance Monitoring in ATC

    NASA Technical Reports Server (NTRS)

    Reynolds, Tom G.; Histon, Jonathan M.; Davison, Hayley J.; Hansman, R. John

    2004-01-01

    Infield studies of current Air Traffic Control operations it is found that controllers rely on underlying airspace structure to reduce the complexity of the planning and conformance monitoring tasks. The structure appears to influence the controller's working mental model through abstractions that reduce the apparent cognitive complexity. These structure-based abstractions are useful for the controller's key tasks of planning, implementing, monitoring, and evaluating tactical situations. In addition, the structure-based abstractions appear to be important in the maintenance of Situation Awareness. The process of conformance monitoring is analyzed in more detail and an approach to conformance monitoring which utilizes both the structure-based abstractions and intent is presented.

  7. IMPLEMENTING PRACTICAL PICO-HYDROPOWER

    EPA Science Inventory

    Deliverables for this proposal will be energy output data modeled from experimental testing of the hydropower unit and monitoring of the stormwater handling infrastructure in the GIS building; along with a design and engineering plan for implementation and building integrat...

  8. Tools to improve planning, implementation, monitoring, and evaluation of complementary feeding programmes.

    PubMed

    Untoro, Juliawati; Childs, Rachel; Bose, Indira; Winichagoon, Pattanee; Rudert, Christiane; Hall, Andrew; de Pee, Saskia

    2017-10-01

    Adequate nutrient intake is a prerequisite for achieving good nutrition status. Suboptimal complementary feeding practices are a main risk factor for stunting. The need for systematic and user-friendly tools to guide the planning, implementation, monitoring, and evaluation of dietary interventions for children aged 6-23 months has been recognized. This paper describes five tools, namely, ProPAN, Optifood, Cost of the Diet, Fill the Nutrient Gap, and Monitoring Results for Equity System that can be used in different combinations to improve situation analysis, planning, implementation, monitoring, or evaluation approaches for complementary feeding in a particular context. ProPAN helps with development of strategies and activities designed to change the behaviours of the target population. Optifood provides guidance for developing food-based recommendations. The Cost of the Diet can provide insight on economic barriers to accessing a nutritious and balanced diet. The Fill the Nutrient Gap facilitates formulation of context-specific policies and programmatic approaches to improve nutrient intake, through a multistakeholder process that uses insights from linear programming and secondary data. The Monitoring Results for Equity System helps with analysis of gaps, constraints, and determinants of complementary feeding interventions and adoption of recommended practices especially in the most vulnerable and deprived populations. These tools, and support for their use, are readily available and can be used either alone and/or complementarily throughout the programme cycle to improve infant and young child-feeding programmes at subnational and national levels. © 2017 John Wiley & Sons Ltd.

  9. Northwest Forest Plan–the first 20 years (1994-2013): status and trends of late-successional and old-growth forests

    Treesearch

    Raymond J. Davis; Janet L. Ohmann; Robert E. Kennedy; Warren B. Cohen; Matthew J. Gregory; Zhiqiang Yang; Heather M. Roberts; Andrew N. Gray; Thomas A. Spies

    2015-01-01

    This is the third in a series of periodic monitoring reports on LSOG or latesuccessional and old-growth (older) forest status trends on federally administered lands since implementation of the Northwest Forest Plan (NWFP or the Plan) in 1994. The objective of this monitoring is to determine if the NWFP is providing for conservation and management of older forests as...

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    This Monitoring Report describes groundwater monitoring for the property at Ramona, Kansas, on which a grain storage facility was formerly operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The monitoring was implemented on behalf of the CCC/USDA by Argonne National Laboratory. Monitoring was conducted as specified in the Long-Term Groundwater Monitoring Plan (Argonne 2012) approved by the Kansas Department of Health and Environment (KDHE 2012).

  11. 78 FR 14450 - Approval and Promulgation of Implementation Plans; Tennessee; 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ... to address basic SIP requirements, including emissions inventories, monitoring, and modeling to... basic structural SIP elements such as modeling, monitoring, and emissions inventories that are designed...): Emission limits and other control measures. 110(a)(2)(B): Ambient air quality monitoring/data system. 110(a...

  12. 77 FR 62147 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Pittsburgh-Beaver...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ... completeness requirement for one or more quarters during 2009-2011. EPA addressed the missing data of each of...-assured, quality-controlled and certified ambient air monitoring data for the 2008-2010 and 2009-2011...- assured, quality-controlled, and certified monitoring data for the 2007-2009 monitoring period, that the...

  13. Guide to effective monitoring of aquatic and riparian resources

    Treesearch

    Jeffrey L. Kershner; Eric K. Archer; Marc Coles-Ritchie; Ervin R. Cowley; Richard C. Henderson; Kim Kratz; Charles M. Quimby; David L. Turner; Linda C. Ulmer; Mark R. Vinson

    2004-01-01

    This monitoring plan for aquatic and riparian resources was developed in response to monitoring needs addressed in the Biological Opinions for bull trout (U.S. Department of the Interior, Fish and Wildlife Service 1998) and steelhead (U.S. Department of Commerce, National Marine Fisheries Service). It provides a consistent framework for implementing the effectiveness...

  14. 78 FR 63093 - Approval and Promulgation of Air Quality Implementation Plans; Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... section of 326 IAC Article 7 concerning sulfur dioxide compliance monitoring requirements. On September 6... monitoring and sulfur dioxide control requirements in Indiana SIP. In addition to 326 IAC 1-2-23.5, the State... 63095

  15. Integrated risk and recovery monitoring of ecosystem restorations on contaminated sites

    USGS Publications Warehouse

    Hooper, Michael J.; Glomb, Stephen J.; Harper, David; Hoelzle, Timothy B.; McIntosh, Lisa M.; Mulligan, David R.

    2016-01-01

    Ecological restorations of contaminated sites balance the human and ecological risks of residual contamination with the benefits of ecological recovery and the return of lost ecological function and ecosystem services. Risk and recovery are interrelated dynamic conditions, changing as remediation and restoration activities progress through implementation into long-term management and ecosystem maturation. Monitoring restoration progress provides data critical to minimizing residual contaminant risk and uncertainty, while measuring ecological advancement toward recovery goals. Effective monitoring plans are designed concurrently with restoration plan development and implementation and are focused on assessing the effectiveness of activities performed in support of restoration goals for the site. Physical, chemical, and biotic measures characterize progress toward desired structural and functional ecosystem components of the goals. Structural metrics, linked to ecosystem functions and services, inform restoration practitioners of work plan modifications or more substantial adaptive management actions necessary to maintain desired recovery. Monitoring frequency, duration, and scale depend on specific attributes and goals of the restoration project. Often tied to restoration milestones, critical assessment of monitoring metrics ensures attainment of risk minimization and ecosystem recovery. Finally, interpretation and communication of monitoring findings inform and engage regulators, other stakeholders, the scientific community, and the public. Because restoration activities will likely cease before full ecosystem recovery, monitoring endpoints should demonstrate risk reduction and a successional trajectory toward the condition established in the restoration goals. A detailed assessment of the completed project's achievements, as well as unrealized objectives, attained through project monitoring, will determine if contaminant risk has been minimized, if injured resources have recovered, and if ecosystem services have been returned. Such retrospective analysis will allow better planning for future restoration goals and strengthen the evidence base for quantifying injuries and damages at other sites in the future.

  16. 75 FR 31811 - Endangered and Threatened Wildlife and Plants; Post-Delisting Monitoring Plan for Bald Eagle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-04

    ... Species Act (ESA) requires that we implement a system, in cooperation with the States, to monitor... cooperation with the States, to effectively monitor for not less than 5 years the status of all species that... stratified sampling based on density of identified bald eagle nest sites. Our Bald Eagle Monitoring Team will...

  17. 77 FR 30208 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Baltimore Nonattainment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... completeness criteria for 2010 is incorrect. As explained in the TSD, the missing data from the primary monitor..., appendix N. Missing data from a primary monitor at a site does not necessarily mean that the data at the monitoring site is incomplete. When data from a collocated monitor is used to substitute for missing data at...

  18. Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070

    NASA Technical Reports Server (NTRS)

    Wilson, Deborah M.; Miller, Ralinda R.

    2015-01-01

    The purpose of this CMI Year 9 AGWMR is to present the actions taken and results obtained during the ninth year of implementation of Corrective Measures (CM) at HMF. Groundwater monitoring activities were conducted in accordance with the CMI Work Plan (Tetra Tech, 2005a) and CMI Site-Specific Safety and Health Plan (Tetra Tech, 2005b). Groundwater monitoring activities detailed in this Year 9 report include pre-startup sampling in February 2014(prior to restarting the air sparging system) and quarterly performance monitoring in March, July, and September 2014.

  19. Status and trends monitoring of the mainstem Columbia River: sample frame development and review of programs relevant to the development of an integrated approach to monitoring

    USGS Publications Warehouse

    Counihan, Timothy D.; Hardiman, Jill M.; Waste, Stephen

    2013-01-01

    Implementing an Integrated Status and Trends Monitoring program (ISTM) for the mainstem Columbia River will help identify trends in important natural resources and help us understand the long-term collective effects of management actions. In this report, we present progress towards the completion of a stepwise process that will facilitate the development of an ISTM for the mainstem Columbia River. We discuss planning and regulatory documents that can be used to identify monitoring goals and objectives and present existing monitoring and research activities that should be considered as the development of a Columbia River ISTM proceeds. We also report progress towards the development of sample frames for the Columbia and Snake Rivers and their floodplains. The sample frames were formulated using Digital Elevation Models (DEM’s) of the river channel and upland areas and a Generalized Random-Tessellation Stratified (GRTS) algorithm for an area based resource to generate “master sample(s).” Working with the Pacific Northwest Aquatic Monitoring Partnership (PNAMP) we facilitated the transfer of the sample frames to the PNAMP “Monitoring Sample Designer” tool. We then discuss aspects of response and survey designs as they pertain to the formulation of a mainstem Columbia River ISTM. As efforts to formulate an ISTM for the mainstem Columbia River proceed, practitioners should utilize the extensive literature describing the planning and implementation of fish and wildlife mitigation and recovery efforts in the Columbia River Basin. While we make progress towards establishing an ISTM framework, considerable work needs to be done to formulate an ISTM program for the mainstem Columbia River. Long-term monitoring programs have been established for other large rivers systems; scientists that have experience planning, implementing, and maintaining large river monitoring efforts such as those in the Colorado, Illinois, and Mississippi Rivers should be consulted and involved as efforts proceed.

  20. Software Configuration Management Plan for the B-Plant Canyon Ventilation Control System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCDANIEL, K.S.

    1999-08-31

    Project W-059 installed a new B Plant Canyon Ventilation System. Monitoring and control of the system is implemented by the Canyon Ventilation Control System (CVCS). This Software Configuration Management Plan provides instructions for change control of the CVCS.

  1. 40 CFR 52.796 - Industrial continuous emission monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuous emission monitoring. (a) APC-8, Appendix I 1.2.3, 3.3, and 6.0 are disapproved because they do not... incorporated and made a part of the applicable implementation plan for the State of Indiana. (2) APC-8 does not...

  2. Implementing an electronic hand hygiene monitoring system: Lessons learned from community hospitals.

    PubMed

    Edmisten, Catherine; Hall, Charles; Kernizan, Lorna; Korwek, Kimberly; Preston, Aaron; Rhoades, Evan; Shah, Shalin; Spight, Lori; Stradi, Silvia; Wellman, Sonia; Zygadlo, Scott

    2017-08-01

    Measuring and providing feedback about hand hygiene (HH) compliance is a complicated process. Electronic HH monitoring systems have been proposed as a possible solution; however, there is little information available about how to successfully implement and maintain these systems for maximum benefit in community hospitals. An electronic HH monitoring system was implemented in 3 community hospitals by teams at each facility with support from the system vendor. Compliance rates were measured by the electronic monitoring system. The implementation challenges, solutions, and drivers of success were monitored within each facility. The electronic HH monitoring systems tracked on average more than 220,000 compliant HH events per facility per month, with an average monthly compliance rate >85%. The sharing of best practices between facilities was valuable in addressing challenges encountered during implementation and maintaining a high rate of use. Drivers of success included a collaborative environment, leadership commitment, using data to drive improvement, consistent and constant messaging, staff empowerment, and patient involvement. Realizing the full benefit of investments in electronic HH monitoring systems requires careful consideration of implementation strategies, planning for ongoing support and maintenance, and presenting data in a meaningful way to empower and inspire staff. Copyright © 2017 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  3. Suggestions for planning a migration-monitoring network based on the experience of establishing and operating the maps program

    Treesearch

    David F. DeSante

    2005-01-01

    Based on the experience of creating and implementing the Monitoring Avian Productivity and Survivorship (MAPS) program, I suggest that, to be successful, a migration-monitoring network must: (1) provide strong justification for the data it proposes to collect; (2) provide direct links between those monitoring data and both research and management goals; (3) provide...

  4. Overview of the National Inventory and Monitoring Applications Center (NIMAC)

    Treesearch

    Charles T. Scott

    2009-01-01

    The National Inventory and Monitoring Applications Center (NIMAC) was created by the Forest Inventory and Analysis (FIA) program in 2006. NIMAC addresses a growing need, expressed by FIA partners, for technical assistance in designing and implementing monitoring plans for forests at scales finer than that provided by the FIA standard inventory. NIMAC's goal is to...

  5. 77 FR 3147 - Approval and Promulgation of Air Quality Implementation Plans; Delaware, New Jersey, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ... monitors with missing data. Maximum recorded values are substituted for the missing data. The resulting... which the incomplete site is missing data. The linear regression relationship is based on time periods... between the monitors is used to fill in missing data for the incomplete monitor, so that the normal data...

  6. 77 FR 34297 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Pittsburgh-Beaver...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... requirement, monitoring sites ID 42-003-0093 (North Park) and ID 42- 003-0095 (Moon) have missing data for the... monitoring periods 2007-2009 and 2008-2010, EPA has addressed the missing data by applying a recently... based upon complete, quality-assured and certified ambient air monitoring data for the 2008-2010 period...

  7. PLANNING AND IMPLEMENTING A REAL-TIME AIR POLLUTION MONITORING AND OUTREACH PROGRAM FOR YOUR COMMUNITY: THE AIRBEAT PROJECT OF ROXBURY, MASSACHUSETTS

    EPA Science Inventory

    EPA has developed a technology transfer handbook for the EMPACT Roxbury Air Monitoring (AirBeat) Project. The purpose of AirBeat is to make real-time air quality monitoring information (for ozone, black carbon, and fine particulates) available to the Boston MA community of Roxbur...

  8. Implementation of Water Safety Plans (WSPs): A Case Study in the Coastal Area in Semarang City, Indonesia

    NASA Astrophysics Data System (ADS)

    Budiyono; Ginandjar, P.; Saraswati, L. D.; Pangestuti, D. R.; Martini; Jati, S. P.

    2018-02-01

    An area of 508.28 hectares in North Semarang is flooded by tidal inundation, including Bandarharjo village, which could affect water quality in the area. People in Bandarharjo use safe water from deep groundwater, without disinfection process. More than 90% of water samples in the Bandaharjo village had poor bacteriological quality. The aimed of the research was to describe the implementation of Water Safety Plans (WSPs) program in Bandarharjo village. This was a descriptive study with steps for implementations adopted the guidelines and tools of the World Health Organization. The steps consist of introducing WSPs program, team building, training the team, examination of water safety before risk assessment, risk assessment, minor repair I, examination of water safety risk, minor repair II (after monitoring). Data were analyzed using descriptive methods. WSPs program has been introduced and formed WSPs team, and the training of the team has been conducted. The team was able to conduct risks assessment, planned the activities, examined water quality, conduct minor repair and monitoring at the source, distribution, and households connection. The WSPs program could be implemented in the coastal area in Semarang, however regularly supervision and some adjustment are needed.

  9. 7 CFR 25.401 - Responsibility of lead managing entity.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... lead managing entity will be responsible for strategic plan program activities and monitoring the fiscal management of the funds of the Empowerment Zone or Enterprise Community. (b) Reporting. The lead.... All entities with significant involvement in implementing the strategic plan shall cooperate with the...

  10. 7 CFR 25.401 - Responsibility of lead managing entity.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... lead managing entity will be responsible for strategic plan program activities and monitoring the fiscal management of the funds of the Empowerment Zone or Enterprise Community. (b) Reporting. The lead.... All entities with significant involvement in implementing the strategic plan shall cooperate with the...

  11. 75 FR 33562 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-14

    ...EPA is proposing to determine that the Birmingham, Alabama, nonattainment area for the 2006 24-hour fine particulate matter (PM2.5) National Ambient Air Quality Standard (NAAQS) has attained the 2006 24-hour PM2.5 NAAQS. This proposed determination is based upon complete, quality assured, quality controlled, and certified ambient air monitoring data for the years 2007-2009 showing that this area has monitored attainment of the 2006 24-hour PM2.5 NAAQS. If this proposed determination is made final, the requirement for the State of Alabama to submit an attainment demonstration and associated reasonably available control measures (RACM), reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plans (SIPs) related to attainment of the 2006 24-hour PM2.5 standard for the Birmingham, Alabama, PM2.5 nonattainment area, shall be suspended for as long as this area continues to meet the 2006 24-hour PM2.5 NAAQS.

  12. 40 CFR 52.1680 - Control strategy: Monitoring and reporting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Control strategy: Monitoring and reporting. 52.1680 Section 52.1680 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New York § 52.1680...

  13. Magnetic-Based NDE of Prestressed and Post-Tensioned Concrete Members: The MFL System.

    DOT National Transportation Integrated Search

    1997-07-01

    Many metropolitan areas have begun or are planning to implement traffic monitoring programs to meet the many demands for traffic data. The purpose of this project is to document a series of examples of urban traffic monitoring data collection program...

  14. 40 CFR 52.430 - Photochemical Assessment Monitoring Stations (PAMS) Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Photochemical Assessment Monitoring Stations (PAMS) Program. 52.430 Section 52.430 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Natural Resources & Environmental Control submitted a plan for the establishment and implementation of a...

  15. 76 FR 69214 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Consumer and Commercial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... portable fuel containers, consumer products, architectural and industrial (AIM) coatings, adhesives and... the control technology, testing, monitoring, administrative, recordkeeping, and reporting requirements... and products subject to the standards subject to the provisions of Chapter 45, specify monitoring...

  16. 77 FR 37248 - Delegations of Authority for the Office of Housing-Federal Housing Administration (FHA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... office develops and implements policies and guidelines for the loan origination, construction, asset.... It develops and implements policies and guidelines for plans and specifications, construction contracts, construction monitoring, construction draws, and closeout of the facility construction. This...

  17. Chapter 1 - Executive summary

    Treesearch

    Matthew G. Rollins; Robert E. Keane; Zhiliang Zhu

    2006-01-01

    Geospatial data describing wildland fuel and current as well as historical vegetation conditions are essential for planning, implementing, and monitoring projects supported by the National Fire Plan and the Healthy Forests Restoration Act. Scientifically credible, consistent, and standardized spatial data allow fire and land managers to accurately identify the amount...

  18. An assessment of a traffic monitoring system for a major traffic generator to improve regional planning : technical report.

    DOT National Transportation Integrated Search

    2009-09-01

    The opening of a major traffic generator in the San Antonio area provided an opportunity to develop and : implement an extensive traffic monitoring system to analyze local, area, and regional traffic impacts from the : generator. Researchers reviewed...

  19. On the role of model-based monitoring for adaptive planning under uncertainty

    NASA Astrophysics Data System (ADS)

    Raso, Luciano; Kwakkel, Jan; Timmermans, Jos; Haasnoot, Mariolijn

    2016-04-01

    Adaptive plans, designed to anticipate and respond to an unfolding uncertain future, have found a fertile application domain in the planning of deltas that are exposed to rapid socioeconomic development and climate change. Adaptive planning, under the moniker of adaptive delta management, is used in the Dutch Delta Program for developing a nation-wide plan to prepare for uncertain climate change and socio-economic developments. Scientifically, adaptive delta management relies heavily on Dynamic Adaptive Policy Pathways. Currently, in the Netherlands the focus is shifting towards implementing the adaptive delta plan. This shift is especially relevant because the efficacy of adaptive plans hinges on monitoring on-going developments and ensuring that actions are indeed taken if and when necessary. In the design of an effective monitoring system for an adaptive plan, three challenges have to be confronted: • Shadow of the past: The development of adaptive plans and the design of their monitoring system relies heavily on current knowledge of the system, and current beliefs about plausible future developments. A static monitoring system is therefore exposed to the exact same uncertainties one tries to address through adaptive planning. • Inhibition of learning: Recent applications of adaptive planning tend to overlook the importance of learning and new information, and fail to account for this explicitly in the design of adaptive plans. • Challenge of surprise: Adaptive policies are designed in light of the current foreseen uncertainties. However, developments that are not considered during the design phase as being plausible could still substantially affect the performance of adaptive policies. The shadow of the past, the inhibition of learning, and the challenge of surprise taken together suggest that there is a need for redesigning the concepts of monitoring and evaluation to support the implementation of adaptive plans. Innovations from control theory, triggered by the challenge of uncertainty in operational control, may offer solutions from which monitoring for adaptive planning can benefit. Specifically: (i) in control, observations are incorporated into the model through data assimilation, updating the present state, boundary conditions, and parameters based on new observations, diminishing the shadow of the past; (ii) adaptive control is a way to modify the characteristics of the internal model, incorporating new knowledge on the system, countervailing the inhibition of learning; and (iii) in closed-loop control, a continuous system update equips the controller with "inherent robustness", i.e. to capacity to adapts to new conditions even when these were not initially considered. We aim to explore how inherent robustness addresses the challenge of surprise. Innovations in model-based control might help to improve and adapt the models used to support adaptive delta management to new information (reducing uncertainty). Moreover, this would offer a starting point for using these models not only in the design of adaptive plans, but also as part of the monitoring. The proposed research requires multidisciplinary cooperation between control theory, the policy sciences, and integrated assessment modeling.

  20. Design and implementation of a compliant robot with force feedback and strategy planning software

    NASA Technical Reports Server (NTRS)

    Premack, T.; Strempek, F. M.; Solis, L. A.; Brodd, S. S.; Cutler, E. P.; Purves, L. R.

    1984-01-01

    Force-feedback robotics techniques are being developed for automated precision assembly and servicing of NASA space flight equipment. Design and implementation of a prototype robot which provides compliance and monitors forces is in progress. Computer software to specify assembly steps and makes force feedback adjustments during assembly are coded and tested for three generically different precision mating problems. A model program demonstrates that a suitably autonomous robot can plan its own strategy.

  1. Chapter 12: Integrating ecological and social science to inform land management in the area of the northwest forest plan

    Treesearch

    Thomas A. Spies; Jonathan W. Long; Peter Stine; Susan Charnley; Lee Cerveny; Bruce G. Marcot; Gordon Reeves; Paul F. Hessburg; Damon Lesmeister; Matthew J. Reilly; Martin G. Raphael; Raymond J. Davis

    2018-01-01

    Long-term monitoring programs and research related to Northwest Forest Plan (NWFP, or Plan) goals, strategies, and outcomes provide an unprecedented opportunity to examine how the scientific basis and socioecological context of the Plan may have changed during the 23 years since its implementation. We also have a prime opportunity to reassess how well the goals and...

  2. 78 FR 27898 - Approval and Promulgation of State Implementation Plan Revisions; Infrastructure Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... arithmetic mean PM 2.5 concentration from single or multiple community- oriented monitors, and 65 [mu]g/m\\3...-oriented monitor within an area. In addition, the 24-hour PM 10 standard was revised to be based on the...): Stationary source monitoring and reporting. 110(a)(2)(G): Emergency powers. 110(a)(2)(H): Future SIP...

  3. A candidate architecture for monitoring and control in chemical transfer propulsion systems

    NASA Technical Reports Server (NTRS)

    Binder, Michael P.; Millis, Marc G.

    1990-01-01

    To support the exploration of space, a reusable space-based rocket engine must be developed. This engine must sustain superior operability and man-rated levels of reliability over several missions with limited maintenance or inspection between flights. To meet these requirements, an expander cycle engine incorporating a highly capable control and health monitoring system is planned. Alternatives for the functional organization and the implementation architecture of the engine's monitoring and control system are discussed. On the basis of this discussion, a decentralized architecture is favored. The trade-offs between several implementation options are outlined and future work is proposed.

  4. RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Annette L. Schafer

    2012-06-01

    A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less

  5. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  6. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  7. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  8. 40 CFR 52.2565 - Original identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Amended Regulations VI and VII, and an Identification and Analysis of the Impact of the 1979 West Virginia... State of West Virginia on November 4, 1983 which establishes an Ambient Air Quality Monitoring Network...) Revision to the State implementation plan consisting of a good engineering practice (GEP) for stack heights...

  9. Wilderness education: The ultimate commitment to quality wilderness stewardship

    Treesearch

    Gregory F. Hansen; Tom Carlson

    2007-01-01

    The effective planning, implementation, and monitoring of a wilderness education program will ultimately produce measurable results that can be instrumental in achieving wilderness management goals and objectives. This paper will provide a simple step-by-step overview of how to develop and maintain a successful wilderness education program through planning,...

  10. Joint ETV/NOWATECH test plan for the Sorbisense GSW40 passive sampler

    EPA Science Inventory

    The joint test plan is the implementation of a test design developed for verification of the performance of an environmental technology following the NOWATECH ETV method. The verification is a joint verification with the US EPA ETV scheme and the Advanced Monitoring Systems Cent...

  11. 76 FR 78916 - Rice Solar Energy Project Record of Decision (DOE/EIS-0439)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... Protection Plan. The Biological Resources Mitigation Implementation and Monitoring Plan will include accurate... consideration that water is a limited resource, the Project owner would use dry cooling, which avoids... markets and transmits wholesale electrical power through an integrated 17,000-circuit mile, high- voltage...

  12. Global Positioning System (GPS) Receiver Autonomous Integrity Monitoring (RAIM) web service to support Area Navigation (RNAV) flight planning

    DOT National Transportation Integrated Search

    2008-01-28

    The Volpe Center designed, implemented, and deployed a Global Positioning System (GPS) Receiver Autonomous Integrity Monitoring (RAIM) prediction system in the mid 1990s to support both Air Force and Federal Aviation Administration (FAA) use of TSO C...

  13. 76 FR 29688 - Approval and Promulgation of State Implementation Plan Revisions; Infrastructure Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-23

    ... requirements for SIPs, including emissions inventories, monitoring, and modeling, to assure attainment and... include requirements, such as modeling, monitoring, and emissions inventories, which are designed to... significant deterioration (PSD) and visibility protection. 110(a)(2)(K): Air quality modeling/data. 110(a)(2...

  14. 78 FR 10136 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    .... NE multispecies sectors are required to design and implement independent, third-party at-sea... NE Multispecies Fishery Management Plan (Amendment 16) require third-party monitoring service... in order to be eligible to provide dockside and/or at-sea monitoring services to sectors. ADDRESSES...

  15. Antimicrobial resistance: from global agenda to national strategic plan, Thailand.

    PubMed

    Tangcharoensathien, Viroj; Sattayawutthipong, Wanchai; Kanjanapimai, Sukhum; Kanpravidth, Wantanee; Brown, Richard; Sommanustweechai, Angkana

    2017-08-01

    In Thailand, antimicrobial resistance has formed a small component of national drug policies and strategies on emerging infectious diseases. However, poor coordination and a lack of national goals and monitoring and evaluation platforms have reduced the effectiveness of the corresponding national actions. On the basis of local evidence and with the strong participation of relevant stakeholders, the first national strategic plan on antimicrobial resistance has been developed in Thailand. Before the development of the plan, ineffective coordination meant that antimicrobial resistance profiles produced at sentinel hospitals were not used effectively for clinical decision-making. There was no integrated system for the surveillance of antimicrobial resistance, no system for monitoring consumption of antimicrobial drugs by humans, livestock and pets and little public awareness of antimicrobial resistance. In August 2016, the Thai government endorsed a national strategic plan on antimicrobial resistance that comprised six strategic actions and five targets. A national steering committee guides the plan's implementation and a module to assess the prevalence of household antibiotic use and antimicrobial resistance awareness has been embedded into the biennial national health survey. A national system for the surveillance of antimicrobial consumption has also been initiated. Strong political commitment, national ownership and adequate multisectoral institutional capacities will be essential for the effective implementation of the national plan. A robust monitoring and evaluation platform now contributes to evidence-based interventions. An integrated system for the surveillance of antimicrobial resistance still needs to be established.

  16. Implementing Response to Intervention: Use of Innovation Configuration Maps within a Multiple-Case Study Analysis

    ERIC Educational Resources Information Center

    Fernando, Sheara

    2010-01-01

    The success of an implementation effort depends on the ability for a system to utilize the innovation effectively; the effective usage of an innovation can be determined by monitoring for program integrity and fidelity, and assessing the degree to which the program implementation matches the intended plan (Fixsen, Blase, Horner, & Sugai 2007). The…

  17. Guidelines for management of noxious weeds at Hanford

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roos, R.C.; Malady, M.B.

    1995-10-27

    Integrated Pest Management Services is responsible for management and control of noxious weeds on the Hanford Site. Weed species and populations are prioritized and objective defined, according to potential site and regional impact. Population controls are implemented according to priority. An integrated approach is planned for noxious weed control in which several management options are considered and implemented separately or in coordination to best meet management objectives. Noxious weeds are inventories and monitored to provide information for planning and program review.

  18. Implementing RTI[superscript 2]: Reports from the Field. Policy Brief

    ERIC Educational Resources Information Center

    Dawkins, Shardae

    2014-01-01

    Starting in 2014-15, districts across the state of Tennessee must implement a Response to Instruction and Intervention (RTI[superscript 2]) plan. RTI[superscript 2] is an instructional framework which provides ongoing monitoring of student performance and progress through the use of universal student screeners and interventions targeted at…

  19. Implementation of medical monitor system based on networks

    NASA Astrophysics Data System (ADS)

    Yu, Hui; Cao, Yuzhen; Zhang, Lixin; Ding, Mingshi

    2006-11-01

    In this paper, the development trend of medical monitor system is analyzed and portable trend and network function become more and more popular among all kinds of medical monitor devices. The architecture of medical network monitor system solution is provided and design and implementation details of medical monitor terminal, monitor center software, distributed medical database and two kind of medical information terminal are especially discussed. Rabbit3000 system is used in medical monitor terminal to implement security administration of data transfer on network, human-machine interface, power management and DSP interface while DSP chip TMS5402 is used in signal analysis and data compression. Distributed medical database is designed for hospital center according to DICOM information model and HL7 standard. Pocket medical information terminal based on ARM9 embedded platform is also developed to interactive with center database on networks. Two kernels based on WINCE are customized and corresponding terminal software are developed for nurse's routine care and doctor's auxiliary diagnosis. Now invention patent of the monitor terminal is approved and manufacture and clinic test plans are scheduled. Applications for invention patent are also arranged for two medical information terminals.

  20. Guidance for Habitat Restoration Monitoring: Framework for Monitoring Plan Development and Implementation (User’s Guide)

    DTIC Science & Technology

    2004-08-01

    release; distribution is unlimited. ENGINEERING SERVICE CENTER Port Hueneme, California 93043-4370 (This page intentionally blank.) REPORT DOCUMENTATION...responses. For example, an extended period of drought may greatly retard, set back, or even prevent establishment of a desired plant species or...Categories of Potential Chemical Monitoring Dataa Monitoring Variable Habitat Type Water Quality pH REDOX DO Salinity Freshwater wetlands S−M S–M M S–M

  1. Implementation of mental health parity: lessons from california.

    PubMed

    Rosenbach, Margo L; Lake, Timothy K; Williams, Susan R; Buck, Jeffrey A

    2009-12-01

    This article reports the experiences of health plans, providers, and consumers with California's mental health parity law and discusses implications for implementation of the 2008 federal parity law. This study used a multimodal data collection approach to assess the first five years of California's parity implementation (from 2000 to 2005). Telephone interviews were conducted with 68 state-level stakeholders, and in-person interviews were conducted with 77 community-based stakeholders. Six focus groups included 52 providers, and six included 32 consumers. A semistructured interview protocol was used. Interview notes and transcripts were coded to facilitate analysis. Health plans eliminated differential benefit limits and cost-sharing requirements for certain mental disorders to comply with the law, and they used managed care to control costs. In response to concerns about access to and quality of care, the state expanded oversight of health plans, issuing access-to-care regulations and conducting focused studies. California's parity law applied to a limited list of psychiatric diagnoses. Health plan executives said they spent considerable resources clarifying which diagnoses were covered at parity levels and concluded that the limited diagnosis list was unnecessary with managed care. Providers indicated that the diagnosis list had unintended consequences, including incentives to assign a more severe diagnosis that would be covered at parity levels, rather than a less severe diagnosis that would not be covered at such levels. The lack of consumer knowledge about parity was widely acknowledged, and consumers in the focus groups requested additional information about parity. Experiences in California suggest that implementation of the 2008 federal parity law should include monitoring health plan performance related to access and quality, in addition to monitoring coverage and costs; examining the breadth of diagnoses covered by health plans; and mounting a campaign to educate consumers about their insurance benefits.

  2. MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laub, S; Dunn, M; Galbreath, G

    2015-06-15

    Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or greenmore » according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.« less

  3. Monitoring implementation of desertification combating plan using geomatics - A case study, districts Dhar and Jhabua, Madhya Pradesh

    NASA Astrophysics Data System (ADS)

    Arunima, Dasgupta; Dhinwa, P. S.; Rajawat, A. S.

    2015-02-01

    The world's drylands are subject to desertification as a result of extended droughts, climate change, and human activities. Development in drylands depends on addressing degradation of the ecosystem, mainstreaming sustainable natural resources management, and building upon the existing adaptive capacities of communities and institutions. In this regard, recent scientific results aimed to promote sustainable development through action plans for combating desertification. In India, under the Integrated Mission for Sustainable Development (IMSD) programme, remote sensing based integrated land and water resource studies were carried out with an objective to generate locale specific action plans for sustainable development of a region. A specific study was carried out, in districts of Jhabua and Dhar, in Madhya Pradesh using Composite Land Development Sites (CLDS) approach for forest and wasteland development and soil and water conservation. Various treatments were suggested and implemented in 1995. The present study was carried out with an objective to monitor the positive impacts of combating plan implementation through visual interpretation and NDVI analysis of temporal images of LISS III data, since 1991 to 2013. The study reveals that there is substantial increase in the area of irrigated agricultural land with increase in number of check dams along with the stream channels.

  4. A tentative discussion on the monitoring of water resources in China

    NASA Astrophysics Data System (ADS)

    Yang, Jianqing; Dai, Ning; Wu, Mengying; Wang, Guangsheng

    2016-10-01

    With the rapid economy development and social civilization progress, the Chinese Government also is improving ecological environmental conditions. More efforts have been made to solve water problems through the implementation of stringent water resources management, as a key government policy on water. Thus, monitoring of water resources has been strengthened, being a main component of the hydrological work in recent years. Compared with routine hydrological monitoring, water resources monitoring pays more attention to the quantity and quality variations of regional waters, to reflect the status of water in river basins and administrative regions. In this paper, the overall layout of the hydrometric network in China is presented, monitoring efforts of the natural water cycle and water consumptions are analyzed, methodologies of water resources monitoring, which are commonly applied in the country, are summed up. Taking the hydrometric network planning on interprovincial boundary waterbodies as example, a summary of the planning at interprovincial boundary river sections is presented. The planning can meet the need of water resources management of administrative divisions. It can also improve the overall water resources monitoring for the country.

  5. Fitting Community Based Newborn Care Package into the health systems of Nepal.

    PubMed

    Pradhan, Y V; Upreti, S R; Kc, N P; Thapa, K; Shrestha, P R; Shedain, P R; Dhakwa, J R; Aryal, D R; Aryal, S; Paudel, D C; Paudel, D; Khanal, S; Bhandari, A; Kc, A

    2011-10-01

    Community-based strategies for delivering effective newborn interventions are an essential step to avert newborn death, in settings where the health facilities are unable to effectively deliver the interventions and reach their population. Effective implementation of community-based interventions as a large scale program and within the existing health system depends on the appropriate design and planning, monitoring and support systems. This article provides an overview of implementation design of Community-Based Newborn Care Package (CB-NCP) program, its setup within the health system, and early results of the implementation from one of the pilot districts. The evaluation of CB-NCP in one of the pilot districts shows significant improvement in antenatal, intrapartum and post natal care. The implementation design of the CB-NCP has six different health system management functions: i) district planning and orientation, ii) training/human resource development, iii) monitoring and evaluation, iv) logistics and supply chain management, v) communication strategy, and vi) pay for performance. The CB-NCP program embraced the existing system of monitoring with some additional components for the pilot phase to test implementation feasibility, and aligns with existing safe motherhood and child health programs. Though CB-NCP interventions are proven independently in different local and global contexts, they are piloted in 10 districts as a "package" within the national health system settings of Nepal.

  6. San Diego Multiple Species Conservation Program (MSCP) Rare Plant Monitoring Review and Revision

    USGS Publications Warehouse

    McEachern, Kathryn; Pavlik, Bruce M.; Rebman, Jon; Sutter, Rob

    2007-01-01

    Introduction The San Diego Multiple Species Conservation Program (MSCP) was developed for the conservation of plants and animals in the south part of San Diego County, under the California Natural Community Conservation Planning Act of 1991 (California Department of Fish and Game) and the Federal Endangered Species Act of 1973, as amended (16 U.S. Code 1531-1544.) The Program is on the leading edge of conservation, as it seeks to both guide development and conserve at-risk species with the oversight of both State and Federal agencies. Lands were identified for inclusion in the MSCP based on their value as habitat for at-risk plants or plant communities (Natural Community Conservation Planning, 2005). Since its inception in the mid-1990s the Program has protected over 100,000 acres, involving 15 jurisdictions and the U.S. Fish and Wildlife Service (USFWS) and California Department of Fish and Game (CDFG) in the conservation of 87 taxa. Surveys for covered species have been conducted, and management and monitoring have been implemented at some high priority sites. Each jurisdiction or agency manages and monitors their conservation areas independently, while collaborating regionally for long-term protection. The San Diego MSCP is on the forefront of conservation, in one of the most rapidly growing urban areas of the country. The planning effort that developed the MSCP was state-of-the-art, using expert knowledge, spatial habitat modeling, and principles of preserve design to identify and prioritize areas for protection. Land acquisition and protection are ahead of schedule for most jurisdictions. Surveys have verified the locations of many rare plant populations known from earlier collections, and they provide general information on population size and health useful for further conservation planning. Management plans have been written or are in development for most MSCP parcels under jurisdictional control. Several agencies are developing databases for implementation and management tracking. In many ways this program is at the cutting edge of regional conservation, testing concepts, developing techniques, and demonstrating conservation effectiveness in new and uncharted ways. Periodic program review is crucial to the continued success of the program, as it moves from a phase of planning and acquisition to one of management and monitoring. Ecological monitoring is the key to assessing the success of the protection and management implemented at each individual reserve and for the MSCP as a whole. The ultimate goal of the Program is conservation of at-risk taxa and their habitats, as well as underlying ecological processes that contribute to sustainability of the ecosystem. Monitoring guidelines and timetables were developed by Ogden Environmental and Energy Services Co., Inc. (1996), and reviewed by Conservation Biology Institute (2001). The Program is in transition now, from the initial stage of land protection to one of land management and monitoring to determine population responses to management regimes. Several agencies have already invested substantial effort in status and trend monitoring, while others are developing their monitoring plans. Management is ongoing at several sites. With both management and monitoring, collaboration and coordination among jurisdictions can be especially fruitful in conserving resources and maximizing success.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    This report describes groundwater monitoring in 2014 for the property at Ramona, Kansas, on which a grain storage facility was formerly operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The monitoring was implemented on behalf of the CCC/USDA by Argonne National Laboratory and was conducted as specified in the Long-Term Groundwater Monitoring Plan (Argonne 2012) approved by the Kansas Department of Health and Environment (KDHE 2012).

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    This report describes groundwater monitoring in 2015 for the property at Ramona, Kansas, on which a grain storage facility was formerly operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The monitoring was implemented on behalf of the CCC/USDA by Argonne National Laboratory and was conducted as specified in the Long-Term Groundwater Monitoring Plan (Argonne 2012) approved by the Kansas Department of Health and Environment (KDHE 2012).

  9. Air Pollution over the States

    ERIC Educational Resources Information Center

    Environmental Science and Technology, 1972

    1972-01-01

    State plans for implementing air quality standards are evaluated together with problems in modeling procedures and enforcement. Monitoring networks, standards, air quality regions, and industrial problems are also discussed. (BL)

  10. Nurse adoption of continuous patient monitoring on acute post-surgical units: managing technology implementation.

    PubMed

    Jeskey, Mary; Card, Elizabeth; Nelson, Donna; Mercaldo, Nathaniel D; Sanders, Neal; Higgins, Michael S; Shi, Yaping; Michaels, Damon; Miller, Anne

    2011-10-01

    To report an exploratory action-research process used during the implementation of continuous patient monitoring in acute post-surgical nursing units. Substantial US Federal funding has been committed to implementing new health care technology, but failure to manage implementation processes may limit successful adoption and the realisation of proposed benefits. Effective approaches for managing barriers to new technology implementation are needed. Continuous patient monitoring was implemented in three of 13 medical/surgical units. An exploratory action-feedback approach, using time-series nurse surveys, was used to identify barriers and develop and evaluate responses. Post-hoc interviews and document analysis were used to describe the change implementation process. Significant differences were identified in night- and dayshift nurses' perceptions of technology benefits. Research nurses' facilitated the change process by evolving 'clinical nurse implementation specialist' expertise. Health information technology (HIT)-related patient outcomes are mediated through nurses' acting on new information but HIT designed for critical care may not transfer to acute care settings. Exploratory action-feedback approaches can assist nurse managers in assessing and mitigating the real-world effects of HIT implementations. It is strongly recommended that nurse managers identify stakeholders and develop comprehensive plans for monitoring the effects of HIT in their units. © 2011 Blackwell Publishing Ltd.

  11. An intervention fidelity framework for technology-based behavioral interventions.

    PubMed

    Devito Dabbs, Annette; Song, Mi-Kyung; Hawkins, Robert; Aubrecht, Jill; Kovach, Karen; Terhorst, Lauren; Connolly, Mary; McNulty, Mary; Callan, Judith

    2011-01-01

    Despite the proliferation of health technologies, descriptions of the unique considerations and practical guidance for evaluating the intervention fidelity of technology-based behavioral interventions are lacking. The aims of this study were to (a) discuss how technology-based behavioral interventions challenge conventions about how intervention fidelity is conceptualized and evaluated, (b) propose an intervention fidelity framework that may be more appropriate for technology-based behavioral interventions, and (c) present a plan for operationalizing each concept in the framework using the intervention fidelity monitoring plan for Pocket PATH (Personal Assistant for Tracking Health), a mobile health technology designed to promote self-care behaviors after lung transplantation, as an exemplar. The literature related to intervention fidelity and technology acceptance was used to identify the issues that are unique to the fidelity of technology-based behavioral interventions and thus important to include in a proposed intervention fidelity framework. An intervention fidelity monitoring plan for technology-based behavioral interventions was developed as an example. The intervention fidelity monitoring plan was deemed feasible and practical to implement and showed utility in operationalizing the concepts such as assessing interventionists' delivery and participants' acceptance of the technology-based behavioral intervention. The framework has the potential to guide the development of implementation fidelity monitoring tools for other technology-based behavioral interventions. Further application and testing of this framework will allow for a better understanding of the role that technology acceptance plays in the adoption and enactment of the behaviors that technology-based behavioral interventions are intended to promote.

  12. Marine spatial planning in practice

    NASA Astrophysics Data System (ADS)

    Collie, Jeremy S.; (Vic) Adamowicz, W. L.; Beck, Michael W.; Craig, Bethany; Essington, Timothy E.; Fluharty, David; Rice, Jake; Sanchirico, James N.

    2013-01-01

    Multiple competing uses of continental-shelf environments have led to a proliferation of marine spatial planning initiatives, together with expert guidance on marine spatial planning. This study provides an empirical review of marine spatial plans, their attributes, and the extent to which the expert guidance is actually being followed. We performed a structured review of 16 existing marine spatial plans and created an idealized marine spatial plan from the steps included in recent expert papers. A cluster analysis of the yes/no answers to 28 questions was used to ordinate the 16 marine spatial plans and to compare them with the idealized plan. All the plans that have been implemented have a high-level government mandate and the authority to implement spatial planning vested in existing institutions. Almost all the plans used data with clear criteria for data inclusion. Stakeholders were included in almost all the plans; they did not participate in all stages of the planning process but their roles were generally clearly defined. Decision-support tools were applied inconsistently across plans and were seldom used dynamically over time. Most spatial planning processes did not select specific outcomes, such as preferred use scenarios. Success is defined inconsistently across plans; in half the cases there are no metrics of success with reference benchmarks. Although monitoring is included in the majority of plans, only in some cases do monitoring results feed back into management decisions. The process of marine spatial planning had advanced in that some of the more recent plans were developed more quickly and contain more desirable attributes than earlier plans. Even so, existing marine spatial plans are heterogeneous—there are essential ingredients, but no single recipe for success.

  13. 40 CFR 85.1412 - Maintenance and submittal of records for equipment certifiers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... original equipment being replaced; (4) A description of the quality control plan used to monitor production... taken in implementing the quality control plan, and any subsequent analyses of that data; and (6) All in... the equipment certifier has offered to sell its certified equipment for less than the life cycle cost...

  14. 40 CFR 85.1412 - Maintenance and submittal of records for equipment certifiers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... original equipment being replaced; (4) A description of the quality control plan used to monitor production... taken in implementing the quality control plan, and any subsequent analyses of that data; and (6) All in... the equipment certifier has offered to sell its certified equipment for less than the life cycle cost...

  15. 77 FR 51930 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Attainment Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... for the Philadelphia Area. While the monitoring data that show the Philadelphia Area attained the 1997... sources (such as cargo handling equipment) at ports. Activity data for land-based sources collected from... emission estimates. EPA also verified that land-based sources for cargo handling equipment, such as...

  16. 40 CFR 96.284 - Opt-in process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Opt-in Units... of interim review, if the plan appears to contain information demonstrating that the SO2 emissions... section, the owner or operator shall monitor and report the SO2 emissions rate and the heat input of the...

  17. 78 FR 57496 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado Second Ten-Year...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... FURTHER INFORMATION CONTACT section to view the hard copy of the docket. You may view the hard copy of the... to illustrate your concerns, and suggest alternatives. g. Explain your views as clearly as possible..., Maintenance Demonstration, Monitoring Network/Verification of Continued Attainment, Contingency Plan, and...

  18. Conservation of the marbled murrelet under the northwest forest plan.

    Treesearch

    Martin G. Raphael

    2006-01-01

    The Marbled Murrelet (Brachyramphus marmoratus) was listed as threatened in 1992, primarily because of loss of its old-forest nesting habitat. Monitoring conducted over the first 10 years following implementation of the Northwest Forest Plan shows at-sea murrelet populations appear to be stationary, but recruitment is very low and demographic...

  19. 76 FR 40248 - Approval and Promulgation of Implementation Plans; Connecticut, Maine, New Hampshire and Rhode...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... infrastructure elements such as modeling, monitoring, and emissions inventories that are designed to assure...): Air quality modeling/data. 110(a)(2)(L): Permitting fees. 110(a)(2)(M): Consultation/participation by... emissions inventories, monitoring, and modeling to assure attainment and maintenance of the standards.'' \\10...

  20. 75 FR 62026 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    ... techniques, provisions for the establishment and operation of appropriate devices necessary to collect data... information.) Ambient air quality monitoring data for the 3-year period must meet a data completeness requirement. The ambient air quality monitoring data completeness requirement is met when the percent of days...

  1. Monitoring goals and programs of the Bureau of Land Management

    Treesearch

    Terrell D. Rich

    1993-01-01

    In 1991, the Bureau of Land Management wrote its Nongame Migratory Bird Habitat Conservation Plan to guide implementation of Partners In Flight objectives on 270 million acres of public land in the U.S. Inventory and monitoring of neotropical migrants are the most important program goals because few bird data are available over...

  2. 40 CFR 63.653 - Monitoring, recordkeeping, and implementation plan for emissions averaging.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) For each emission point included in an emissions average, the owner or operator shall perform testing, monitoring, recordkeeping, and reporting equivalent to that required for Group 1 emission points complying... internal floating roof, external roof, or a closed vent system with a control device, as appropriate to the...

  3. 40 CFR 96.76 - Additional requirements to provide heat input data for allocations purposes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS Monitoring and Reporting § 96.76 Additional requirements... to monitor and report NOX Mass emissions using a NOX concentration system and a flow system shall... chapter for any source located in a state developing source allocations based upon heat input. (b) The...

  4. INVESTIGATING THE EFFICACY OF CLINICAL TRIAL MONITORING STRATEGIES: Design and Implementation of the Cluster Randomized START Monitoring Substudy

    PubMed Central

    Hullsiek, Katherine Huppler; Kagan, Jonathan M; Engen, Nicole; Grarup, Jesper; Hudson, Fleur; Denning, Eileen T; Carey, Catherine; Courtney-Rodgers, David; Finley, Elizabeth B; Jansson, Per O; Pearson, Mary T; Peavy, Dwight E; Belloso, Waldo H

    2014-01-01

    Background Trial monitoring protects participant safety and study integrity. While monitors commonly go on-site to verify source data, there is little evidence that this practice is efficient or effective. An ongoing international HIV treatment trial (START) provides an opportunity to explore the usefulness of different monitoring approaches. Methods All START sites are centrally monitored and required to follow a local monitoring plan requiring specific quality assurance activities. Additionally, sites were randomized (1:1) to receive, or not receive, annual on-site monitoring. The study will determine if on-site monitoring increases the identification of major protocol deviations (eligibility or consent violations, improper study drug use, primary or serious event underreporting, data alteration or fraud). Results The START study completed enrollment in December 2013, with planned follow-up through December 2016. The monitoring study is ongoing at 196 sites in 34 countries. Results are expected when the START study concludes in December 2016. PMID:25973346

  5. Design, implementation, and initial results from a water-quality monitoring network for Atlanta, Georgia, USA

    USGS Publications Warehouse

    Horowitz, A.J.; Elrick, K.A.; Smith, J.J.

    2005-01-01

    In cooperation with the City of Atlanta, Georgia, the US Geological Survey has designed and implemented a water-quantity and quality monitoring network that measures a variety of biological and chemical constituents in water and suspended sediment. The network consists of 20 long-term monitoring sites and is intended to assess water-quality trends in response to planned infrastructural improvements. Initial results from the network indicate that nonpoint-source contributions may be more significant than point-source contributions for selected sediment associated trace elements and nutrients. There also are indications of short-term discontinuous point-source contributions of these same constituents during baseflow.

  6. An evaluation of a real-time fault diagnosis expert system for aircraft applications

    NASA Technical Reports Server (NTRS)

    Schutte, Paul C.; Abbott, Kathy H.; Palmer, Michael T.; Ricks, Wendell R.

    1987-01-01

    A fault monitoring and diagnosis expert system called Faultfinder was conceived and developed to detect and diagnose in-flight failures in an aircraft. Faultfinder is an automated intelligent aid whose purpose is to assist the flight crew in fault monitoring, fault diagnosis, and recovery planning. The present implementation of this concept performs monitoring and diagnosis for a generic aircraft's propulsion and hydraulic subsystems. This implementation is capable of detecting and diagnosing failures of known and unknown (i.e., unforseeable) type in a real-time environment. Faultfinder uses both rule-based and model-based reasoning strategies which operate on causal, temporal, and qualitative information. A preliminary evaluation is made of the diagnostic concepts implemented in Faultfinder. The evaluation used actual aircraft accident and incident cases which were simulated to assess the effectiveness of Faultfinder in detecting and diagnosing failures. Results of this evaluation, together with the description of the current Faultfinder implementation, are presented.

  7. [Municipal planning of care services between competition neutrality and demand planning. An example of care structure planning in Rhineland-Palatinate].

    PubMed

    Klie, T; Pfundstein, T

    2010-04-01

    In times of demographic and social change, it is increasingly important to ensure the availability of care services to cover the growing demand. With the implementation of the German long-term insurance act in 1994, the responsibility of states and municipalities was maintained; however, given the long-term care legislation's market orientation and competition neutrality, the classic instruments for demand planning and supervision of infrastructure developments were lost. This leads to new challenges for states and municipalities: their conventional objective-oriented planning lacks professional and juridical legitimization. Calculations of requirements must relate to methodology and professional expertise. In order to exercise their influence on infrastructure development, instruments of demand planning other than subsidization are required. Using the example of Rheinland-Pfalz (Rhineland-Palatinate) and the newly implemented care structure planning, the concept of care monitoring is introduced, and instruments to influence infrastructure development are outlined.

  8. Introducing a new monitoring manual for home fortification and strengthening capacity to monitor nutrition interventions.

    PubMed

    Jefferds, Maria Elena D; Flores-Ayala, Rafael

    2015-12-01

    Lack of monitoring capacity is a key barrier for nutrition interventions and limits programme management, decision making and programme effectiveness in many low-income and middle-income countries. A 2011 global assessment reported lack of monitoring capacity was the top barrier for home fortification interventions, such as micronutrient powders or lipid-based nutrient supplements. A Manual for Developing and Implementing Monitoring Systems for Home Fortification Interventions was recently disseminated. It is comprehensive and describes monitoring concepts and frameworks and includes monitoring tools and worksheets. The monitoring manual describes the steps of developing and implementing a monitoring system for home fortification interventions, including identifying and engaging stakeholders; developing a programme description including logic model and logical framework; refining the purpose of the monitoring system, identifying users and their monitoring needs; describing the design of the monitoring system; developing indicators; describing the core components of a comprehensive monitoring plan; and considering factors related to stage of programme development, sustainability and scale up. A fictional home fortification example is used throughout the monitoring manual to illustrate these steps. The monitoring manual is a useful tool to support the development and implementation of home fortification intervention monitoring systems. In the context of systematic capacity gaps to design, implement and monitor nutrition interventions in many low-income and middle-income countries, the dissemination of new tools, such as monitoring manuals may have limited impact without additional attention to strengthening other individual, organisational and systems levels capacities. Published 2014. This article is a U.S. Government work and is in the public domain in the USA.

  9. YUCSA: A CLIPS expert database system to monitor academic performance

    NASA Technical Reports Server (NTRS)

    Toptsis, Anestis A.; Ho, Frankie; Leindekar, Milton; Foon, Debra Low; Carbonaro, Mike

    1991-01-01

    The York University CLIPS Student Administrator (YUCSA), an expert database system implemented in C Language Integrated Processing System (CLIPS), for monitoring the academic performance of undergraduate students at York University, is discussed. The expert system component in the system has already been implemented for two major departments, and it is under testing and enhancement for more departments. Also, more elaborate user interfaces are under development. We describe the design and implementation of the system, problems encountered, and immediate future plans. The system has excellent maintainability and it is very efficient, taking less than one minute to complete an assessment of one student.

  10. Northwest Forest Plan--the first 10 years (1994-2003): socioeconomic monitoring of the Okanogan-Wenatchee National Forest and five local communities.

    Treesearch

    C. Dillingham; M.R. Poe; E. Grinspoon; C. Stuart; C. Moseley; R. Mazza; S. Charnley; L. Meierotto; E. Donoghue; N. Toth

    2008-01-01

    This report examines socioeconomic changes that occurred between 1990 and 2003 associated with implementation of the Northwest Forest Plan (the Plan) in and around lands managed by the Okanogan-Wenatchee National Forest in Washington state. Our findings are based on quantitative data from the U.S. census, the USDA Forest Service and other federal databases, historical...

  11. Integration of research advances in modelling and monitoring in support of WFD river basin management planning in the context of climate change.

    PubMed

    Quevauviller, Philippe; Barceló, Damia; Beniston, Martin; Djordjevic, Slobodan; Harding, Richard J; Iglesias, Ana; Ludwig, Ralf; Navarra, Antonio; Navarro Ortega, Alícia; Mark, Ole; Roson, Roberto; Sempere, Daniel; Stoffel, Markus; van Lanen, Henny A J; Werner, Micha

    2012-12-01

    The integration of scientific knowledge about possible climate change impacts on water resources has a direct implication on the way water policies are being implemented and evolving. This is particularly true regarding various technical steps embedded into the EU Water Framework Directive river basin management planning, such as risk characterisation, monitoring, design and implementation of action programmes and evaluation of the "good status" objective achievements (in 2015). The need to incorporate climate change considerations into the implementation of EU water policy is currently discussed with a wide range of experts and stakeholders at EU level. Research trends are also on-going, striving to support policy developments and examining how scientific findings and recommendations could be best taken on board by policy-makers and water managers within the forthcoming years. This paper provides a snapshot of policy discussions about climate change in the context of the WFD river basin management planning and specific advancements of related EU-funded research projects. Perspectives for strengthening links among the scientific and policy-making communities in this area are also highlighted. Copyright © 2012 Elsevier B.V. All rights reserved.

  12. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meachammore » Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).« less

  13. Cultural Resource Protection Plan for the Remote-Handled Low-Level Waste Disposal Facility at the Idaho National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pace, Brenda Ringe; Gilbert, Hollie Kae

    2015-05-01

    This plan addresses cultural resource protection procedures to be implemented during construction of the Remote Handled Low Level Waste project at the Idaho National Laboratory. The plan proposes pre-construction review of proposed ground disturbing activities to confirm avoidance of cultural resources. Depending on the final project footprint, cultural resource protection strategies might also include additional survey, protective fencing, cultural resource mapping and relocation of surface artifacts, collection of surface artifacts for permanent curation, confirmation of undisturbed historic canal segments outside the area of potential effects for construction, and/or archaeological test excavations to assess potential subsurface cultural deposits at known culturalmore » resource locations. Additionally, all initial ground disturbing activities will be monitored for subsurface cultural resource finds, cultural resource sensitivity training will be conducted for all construction field personnel, and a stop work procedure will be implemented to guide assessment and protection of any unanticipated discoveries after initial monitoring of ground disturbance.« less

  14. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek,more » Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.« less

  15. Telemedicine in the Malaysian Multimedia Super Corridor: towards personalized lifetime health plans.

    PubMed

    Abidi, S S; Yusoff, Z

    1999-01-01

    The Malaysian Telemedicine initiative advocates a paradigm shift in healthcare delivery patterns by way of implementing a person-centred and wellness-focused healthcare system. This paper introduces the Malaysian Telemedicine vision, its functionality and associated operational conditions. In particular, we focus on the conceptualisation of one key Telemedicine component i.e. the Lifetime Health Plan (LHP) system--a distributed multimodule application for the periodic monitoring and generation of health-care advisories for all Malaysians. In line with the LHP project, we present an innovative healthcare delivery info-structure--LifePlan--that aims to provide life-long, pro-active, personalised, wellness-oriented healthcare services to assist individuals to manage and interpret their health needs. Functionally, LifePlan based healthcare services are delivered over the WWW, packaged as Personalised Lifetime Health Plans that allow individuals to both monitor their health status and to guide them in healthcare planning.

  16. Treatment Fidelity Among Family Health Promoters Delivering a Physical Activity and Nutrition Intervention to Immigrant and Refugee Families.

    PubMed

    Bronars, Carrie A; Hanza, Marcelo M; Meiers, Sonja J; Patten, Christi A; Clark, Matthew M; Nigon, Julie A; Weis, Jennifer A; Wieland, Mark L; Sia, Irene G

    2017-04-01

    Lack of treatment fidelity can be an important source of variation affecting the credibility and utility of outcomes from behavioral intervention research. Development and implementation of a well-designed treatment fidelity plan, especially with research involving underserved populations, requires careful conceptualization of study needs in conjunction with what is feasible in the population. The purpose of this article is to review a fidelity-monitoring plan consistent with the National Institutes of Health Behavior Change Consortium guidelines (e.g., design, training, delivery, receipt, and enactment) for an intervention trial designed to improve physical activity and nutrition among immigrant and refugee families. Description of the fidelity monitoring plan is provided and challenges related to monitoring treatment fidelity in a community-based participatory intervention for immigrant and refugee families are discussed.

  17. Incipient fault detection study for advanced spacecraft systems

    NASA Technical Reports Server (NTRS)

    Milner, G. Martin; Black, Michael C.; Hovenga, J. Mike; Mcclure, Paul F.

    1986-01-01

    A feasibility study to investigate the application of vibration monitoring to the rotating machinery of planned NASA advanced spacecraft components is described. Factors investigated include: (1) special problems associated with small, high RPM machines; (2) application across multiple component types; (3) microgravity; (4) multiple fault types; (5) eight different analysis techniques including signature analysis, high frequency demodulation, cepstrum, clustering, amplitude analysis, and pattern recognition are compared; and (6) small sample statistical analysis is used to compare performance by computation of probability of detection and false alarm for an ensemble of repeated baseline and faulted tests. Both detection and classification performance are quantified. Vibration monitoring is shown to be an effective means of detecting the most important problem types for small, high RPM fans and pumps typical of those planned for the advanced spacecraft. A preliminary monitoring system design and implementation plan is presented.

  18. Central Alaska Network vital signs monitoring plan

    USGS Publications Warehouse

    MacCluskie, Margaret C.; Oakley, Karen L.; McDonald, Trent; Wilder, Doug

    2005-01-01

    Denali National Park and Preserve, Wrangell-St. Elias National Park and Preserve, and Yukon-Charley Rivers National Preserve have been organized into the Central Alaska Network (CAKN) for the purposes of carrying out ecological monitoring activities under the National Park Services’ Vital Signs Monitoring program. The Phase III Report is the initial draft of the Vital Signs Monitoring Plan for the Central Alaska Network. It includes updated material from the Phase I and II documents. This report, and draft protocols for 11 of the network’s Vital Signs, were peer reviewed early in 2005. Review comments were incorporated into the document bringing the network to the final stage of having a Vital Signs Monitoring Plan. Implementation of the program will formally begin in FY 2006. The broad goals of the CAKN monitoring program are to: (1) better understand the dynamic nature and condition of park ecosystems; and (2) provide reference points for comparisons with other, altered environments. The focus of the CAKN program will be to monitor ecosystems in order to detect change in ecological components and in the relationships among the components. Water quality monitoring is fully integrated within the CAKN monitoring program. A monitoring program for lentic (non-moving water) has been determined, and the program for lotic systems (moving water) is under development.

  19. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Treesearch

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  20. 76 FR 57845 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley; Attainment Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... evaluate monitored air quality data and is used to determine whether an area's air quality meets a NAAQS... documentation in their submittals explaining how the emissions data were calculated. 70 FR at 71664 and EI... inventories for the SJV. See Table 1 below. These revised inventories incorporate improved activity data and...

  1. 78 FR 14681 - Approval and Promulgation of Implementation Plans; Kentucky; 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-07

    ..., and modeling to assure attainment and maintenance for that new NAAQS. Section 110(a) of the CAA... structural SIP requirements such as modeling, monitoring, and emissions inventories that are designed to... limits and other control measures. 110(a)(2)(B): Ambient air quality monitoring/data system. 110(a)(2)(C...

  2. 77 FR 3417 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-24

    ... recorded in EPA's Air Quality System (AQS) database. To account for missing data, the procedures found in... three-year period and then adjusts for missing data. In short, if the three-year average expected... ambient air quality monitoring data for the 2001-2003 monitoring period showing that the area had an...

  3. 78 FR 49403 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... requirement for one or more quarters during 2010-2012 monitoring period. EPA has addressed missing data from... recorded values are substituted for the missing data, and the resulting 24-hour design value is compared to... missing data from the Greensburg monitor by performing a statistical analysis of the data, in which a...

  4. 77 FR 24436 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Milwaukee-Racine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    .... How did EPA address missing data? V. Proposed Action VI. What is the effect of this action? VII.... ** Indicates incomplete data due to monitor shut down. IV. How did EPA address missing data? Appendix N of 40... in Milwaukee, where there are missing or incomplete data due to monitor shutdown or other factors...

  5. 75 FR 26685 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... devices necessary to collect data on ambient air quality, and programs to enforce the limitations. General...-hour ozone NAAQS, based on the most recent three years of complete, quality assured monitoring data... air quality monitoring data for the 3-year period must meet a data completeness requirement. The...

  6. 76 FR 43898 - Approval and Promulgation of State Implementation Plan Revisions; Infrastructure Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ...: The commenter supported EPA's efforts to require ozone monitoring in Utah's Uinta Basin. However, the... air quality in the basin is not in compliance with the ozone standard,'' to designate the Uinta Basin... commenter refers to. For a discussion of other monitoring data in the Uinta Basin, see the response to...

  7. 77 FR 9956 - Announcement of Funding Awards for the Sustainable Communities Regional Planning Grant Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... of regional significance, use data to set and monitor progress toward performance goals, and engage... Principles; d. Use geo-coded data sets and other metrics in developing, implementing, monitoring, and... (103 Stat. 1987, 42 U.S.C. 3545), the Department is publishing the names, addresses, and amounts of the...

  8. 76 FR 27290 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Kentucky; Ohio...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ...EPA is proposing to make two determinations regarding the tri- state Huntington-Ashland, West Virginia-Kentucky-Ohio fine particulate matter (PM2.5) nonattainment Area (hereafter referred to as ``the Huntington-Ashland Area'' or ``Area''). First, EPA is proposing to determine that the Area has attained the 1997 annual average PM2.5 National Ambient Air Quality Standard (NAAQS). This proposed determination of attainment is based upon complete, quality- assured and certified ambient air monitoring data for the 2007-2009 period showing that the Area has attained the 1997 annual PM2.5 NAAQS, and data available to date for 2010 in EPA's Air Quality System (AQS) database that show the area continues to attain. If EPA finalizes this proposed determination of attainment, the requirements for the Area to submit attainment demonstrations and associated reasonably available control measures (RACM), a reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plan (SIP) revisions related to attainment of the standard shall be suspended for so long as the Area continues to attain the annual PM2.5 NAAQS. Second, EPA is also proposing to determine, based on quality-assured and certified monitoring data for the 2007-2009 monitoring period, that the Area has attained the 1997 annual PM2.5 NAAQS by its applicable attainment date of April 5, 2010.

  9. Strategic Plan for the Spanish Academy of Dermatology and Venerology (AEDV): FuturAEDV 2013-2017.

    PubMed

    Ribera Pibernat, M; Moreno Jiménez, J C; Valcuende Cavero, F; Soto de Delás, J; Vázquez Veiga, H; Lázaro Ochaíta, P; Giménez Arnau, A

    2014-09-01

    The Spanish Academy of Dermatology and Venereology (AEDV) has decided that a Strategic Plan is needed to help the association adapt to new circumstances and anticipate future developments. 1) To position the AEDV as a medical association that can exert an influence in everything related to dermatology. 2) To contribute to the development of the specialty, strengthening the prestige and reputation of dermatology and dermatologists. 3) To establish a model for operating and strategic thinking that can be handed on to successive Boards of Directors and will enable the Academy to identify future challenges. The approach used to develop the Strategic Plan was as follows: analysis of trends in the health care system; assessment of the current situation of AEDV and of dermatology in general through an internal analysis based on surveys and interviews with academics; analysis of strengths, weaknesses, opportunities, and threats; preparation of a mission statement; and identification, development, and implementation of a strategy map prioritizing strategic lines of action. The strategy map set out 16 general goals grouped into 4 main topics (achieving the vision, internal and external customers, internal processes, and innovation) and detailed in an action plan with 19 initiatives, each with specific actions. The plan will be monitored by the Strategic Plan Monitoring Committee, which is made up of the members of the Standing Committee and the chairs of the 9 Technical Committees responsible for implementing the initiatives. The Functional Plan should guide the management of AEDV until 2017, and its implementation will enable the association to contribute to the development and prestige of the specialty and position itself as a reference in terms of its functional model. Copyright © 2014 Elsevier España, S.L.U. y AEDV. All rights reserved.

  10. A sampling design framework for monitoring secretive marshbirds

    USGS Publications Warehouse

    Johnson, D.H.; Gibbs, J.P.; Herzog, M.; Lor, S.; Niemuth, N.D.; Ribic, C.A.; Seamans, M.; Shaffer, T.L.; Shriver, W.G.; Stehman, S.V.; Thompson, W.L.

    2009-01-01

    A framework for a sampling plan for monitoring marshbird populations in the contiguous 48 states is proposed here. The sampling universe is the breeding habitat (i.e. wetlands) potentially used by marshbirds. Selection protocols would be implemented within each of large geographical strata, such as Bird Conservation Regions. Site selection will be done using a two-stage cluster sample. Primary sampling units (PSUs) would be land areas, such as legal townships, and would be selected by a procedure such as systematic sampling. Secondary sampling units (SSUs) will be wetlands or portions of wetlands in the PSUs. SSUs will be selected by a randomized spatially balanced procedure. For analysis, the use of a variety of methods as a means of increasing confidence in conclusions that may be reached is encouraged. Additional effort will be required to work out details and implement the plan.

  11. Harmonizing disease prevention and police practice in the implementation of HIV prevention programs: Up-stream strategies from Wilmington, Delaware

    PubMed Central

    2012-01-01

    Introduction Improving access to sterile injection equipment is a key component in community-based infectious disease prevention. Implementation of syringe access programs has sometimes been complicated by community opposition and police interference. Case description In 2006, the Delaware legislature authorized a pilot syringe exchange program (SEP). A program designed to prevent, monitor, and respond to possible policing and community barriers before they had a chance to effect program implementation and operation. A program designed to prevent, monitor, and respond to these barriers was planned and implemented by a multidisciplinary team of legal practitioners and public health professionals. Discussion We report on an integrated intervention to address structural barriers to syringe exchange program utilization. This intervention employs community, police and client education combined with systematic surveillance of and rapid response to police interference to preempt the kinds of structural barriers to implementation observed elsewhere. The intervention addresses community concerns and stresses the benefits of syringe exchange programs to officer occupational safety. Conclusions A cohesive effort combining collaboration with and educational outreach to police and community members based on the needs and concerns of these groups as well as SEP clients and potential clients helped establish a supportive street environment for the SEP. Police-driven structural barriers to implementation of public health programs targeting populations engaged in drug use and other illicit behavior can be addressed by up-stream planning, prevention, monitoring and intervention strategies. More research is needed to inform the tailoring of interventions to address police-driven barriers to HIV prevention services, especially among marginalized populations. PMID:22591836

  12. IDF Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    This document provides a review and status of activities conducted in support of the CH2MHill Hanford Group (CHG) Compensatory Mitigation Implementation Plan (MIP) for the Integrated Disposal Facility (IDF). It includes time-zero monitoring results for planting activities conducted in December 2007, annual survival monitoring for all planting years, a summary of artificial burrow observations, and recommendations for the successful completion of DOE mitigation commitments for this project.

  13. A systematic approach to the planning, implementation, monitoring, and evaluation of integrated health services.

    PubMed

    Reynolds, Heidi W; Sutherland, Elizabeth G

    2013-05-06

    Because of the current emphasis and enthusiasm focused on integration of health systems, there is a risk of piling resources into integrated strategies without the necessary systems in place to monitor their progress adequately or to measure impact, and to learn from these efforts. The rush to intervene without adequate monitoring and evaluation will continue to result in a weak evidence base for decision making and resource allocation. Program planning and implementation are inextricability linked to monitoring and evaluation. Country level guidance is needed to identify country-specific integrated strategies, thereby increasing country ownership. This paper focuses on integrated health services but takes into account how health services are influenced by the health system, managed by programs, and made up of interventions. We apply the principles in existing comprehensive monitoring and evaluation (M&E) frameworks in order to outline a systematic approach to the M&E of integration for the country level. The approach is grounded by first defining the country-specific health challenges that integration is intended to affect. Priority points of contact for care can directly influence health, and essential packages of integration for all major client presentations need to be defined. Logic models are necessary to outline the plausible causal pathways and define the inputs, roles and responsibilities, indicators, and data sources across the health system. Finally, we recommend improvements to the health information system and in data use to ensure that data are available to inform decisions, because changes in the M&E function to make it more integrated will also facilitate integration in the service delivery, planning, and governance components. This approach described in the paper is the ideal, but its application at the country level can help reveal gaps and guide decisions related to what health services to prioritize for integration, help plan for how to strengthen systems to support health services, and ultimately establish an evidence base to inform investments in health care. More experience is needed to understand if the approach is feasible; similarly, more emphasis is needed on documenting the process of designing and implemented integrated interventions at the national level.

  14. Sentinel-4: the geostationary component of the GMES atmosphere monitoring missions

    NASA Astrophysics Data System (ADS)

    Bazalgette Courrèges-Lacoste, G.; Arcioni, M.; Meijer, Y.; Bézy, J.-L.; Bensi, P.; Langen, J.

    2017-11-01

    The implementation of operational atmospheric composition monitoring missions is foreseen in the context of the Global Monitoring for Environment and Security (GMES) initiative. Sentinel-4 will address the geostationary observations and Sentinel-5 the low Earth orbit ones. The two missions are planned to be launched on-board Eumetsat's Meteosat Third Generation (MTG) and Post-EPS satellites, respectively. This paper presents an overview of the GMES Sentinel- 4 mission, which has been assessed at Phase-0 level. It describes the key requirements and outlines the main aspects of the candidate implementation concepts available at completion of Phase-0. The paper will particularly focus on the observation mode, the estimated performance and the related technology developments.

  15. Integrated Planning for Telepresence with Time Delays

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Rabe, Kenneth J.

    2006-01-01

    Integrated planning and execution of teleoperations in space with time delays is shown. The topics include: 1) The Problem; 2) Future Robot Surgery? 3) Approach Overview; 4) Robonaut; 5) Normal Planning and Execution; 6) Planner Context; 7) Implementation; 8) Use of JSHOP2; 9) Monitoring and Testing GUI; 10) Normal sequence: first the supervisor acts; 11) then the robot; 12) Robot might be late; 13) Supervisor can work ahead; 14) Deviations from Plan; 15) Robot State Change Example; 16) Accomplished goals skipped in replan; 17) Planning continuity; 18) Supervisor Deviation From Plan; 19) Intentional Deviation; and 20) Infeasible states.

  16. Process evaluation of a community-based mental health promotion intervention for refugee children

    PubMed Central

    Nakkash, Rima T.; Alaouie, Hala; Haddad, Pascale; El Hajj, Taghreed; Salem, Heba; Mahfoud, Ziyad; Afifi, Rema A.

    2012-01-01

    Public health interventions are complex in nature and composed of multiple components. Evaluation of process and impact is necessary to build evidence of effectiveness. Process evaluation involves monitoring extent of implementation and comparison against the program plan. This article describes the process evaluation of the ‘Qaderoon’ (We are Capable) intervention; a community-based mental health promotion intervention for children living in a Palestinian refugee camp of Beirut, Lebanon. The manuscript describes the context of Palestinian refugees in Lebanon, the intervention, the process evaluation plan and results. The process evaluation was guided by the literature and by a Community Youth Committee. Findings indicated that attendance was 54 and 38% for summer and fall sessions, respectively. Session objectives and activities were commonly achieved. Over 78.4% of activities were reported to be implemented fully as planned. Over 90% of the children indicated high satisfaction with the sessions. Contextual facilitators and challenges to implementing the intervention are discussed. The most challenging were maintaining attendance and the actual implementation of the process evaluation plan. Findings from process evaluation will strengthen interpretation of impact evaluation results. PMID:21908850

  17. 77 FR 28782 - Approval and Promulgation of Air Quality Implementation Plans; Delaware, New Jersey, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ...EPA is making two determinations regarding the Philadelphia- Wilmington, PA-NJ-DE fine particulate (PM2.5) nonattainment area (the Philadelphia Area). First, EPA is making a determination that the Philadelphia Area has attained the 1997 annual PM2.5 national ambient air quality standard (NAAQS) by its attainment date of April 5, 2010. This determination is based upon quality assured and certified ambient air monitoring data that show the area monitored attainment of the 1997 annual PM2.5 NAAQS for the 2007-2009 monitoring period. Second, EPA is making a clean data determination, finding that the Philadelphia Area has attained the 1997 PM2.5 NAAQS, based on quality assured and certified ambient air monitoring data for the 2007-2009 and 2008-2010 monitoring periods. In accordance with EPA's applicable PM2.5 implementation rule, this determination suspends the requirement for the Philadelphia Area to submit an attainment demonstration, reasonably available control measures/reasonably available control technology (RACM/RACT), a reasonable further progress (RFP) plan, and contingency measures related to attainment of the 1997 annual PM2.5 NAAQS for so long as the area continues to attain the 1997 annual PM2.5 NAAQS. These actions are being taken under the Clean Air Act (CAA).

  18. 78 FR 72036 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... maintenance plan to the year 2025 and updating the sub-area motor vehicle emission budgets (MVEBs) for... taking? III. Why is EPA taking these actions? IV. What are the effects of these actions? V. Final Action... design values Location County Monitor ID 2008 2009 2010 2008-2010 Lincoln County Replacing Iron Station...

  19. Fuels planning: science synthesis and integration; social issues fact sheet 13: Strategies for managing fuels and visual quality

    Treesearch

    Christine Esposito

    2006-01-01

    The public's acceptance of forest management practices, including fuels reduction, is heavily based on how forests look. Fuels managers can improve their chances of success by considering aesthetics when making management decisions. This fact sheet reviews a three-part general strategy for managing fuels and visual quality: planning, implementation, and monitoring...

  20. EPA Concurrence/Approval of Federal Facility Proposed Plans and Records of Decision and other Documents

    EPA Pesticide Factsheets

    The purpose of this memorandum is to ensure that EPA Regions scrutinize all proposed plans, draft and final RODs, and post-ROD documents that address institutional controls (ICs) in order to verify that they adequately document the objectives of the ICs and clearly identify who has responsibility for implementation, monitoring, reporting, and enforcement of the IC.

  1. The design of an m-Health monitoring system based on a cloud computing platform

    NASA Astrophysics Data System (ADS)

    Xu, Boyi; Xu, Lida; Cai, Hongming; Jiang, Lihong; Luo, Yang; Gu, Yizhi

    2017-01-01

    Compared to traditional medical services provided within hospitals, m-Health monitoring systems (MHMSs) face more challenges in personalised health data processing. To achieve personalised and high-quality health monitoring by means of new technologies, such as mobile network and cloud computing, in this paper, a framework of an m-Health monitoring system based on a cloud computing platform (Cloud-MHMS) is designed to implement pervasive health monitoring. Furthermore, the modules of the framework, which are Cloud Storage and Multiple Tenants Access Control Layer, Healthcare Data Annotation Layer, and Healthcare Data Analysis Layer, are discussed. In the data storage layer, a multiple tenant access method is designed to protect patient privacy. In the data annotation layer, linked open data are adopted to augment health data interoperability semantically. In the data analysis layer, the process mining algorithm and similarity calculating method are implemented to support personalised treatment plan selection. These three modules cooperate to implement the core functions in the process of health monitoring, which are data storage, data processing, and data analysis. Finally, we study the application of our architecture in the monitoring of antimicrobial drug usage to demonstrate the usability of our method in personal healthcare analysis.

  2. 77 FR 45954 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ...EPA is making two determinations, one regarding the Knoxville, Tennessee, 1997 annual fine particulate (PM2.5) nonattainment area and one regarding the Knoxville-Sevierville-La Follette, Tennessee, 2006 24-hour PM2.5 nonattainment area (both areas have the same geographic boundary and will hereafter be collectively referred to as the ``Knoxville Area'' or ``Area''). First, EPA is determining that the Area has attained the 1997 annual PM2.5 National Ambient Air Quality Standards (NAAQS or ``standard''). Second, EPA is determining that the Area has attained the 2006 24-hour PM2.5 NAAQS. These determinations of attaining data are based upon quality-assured and certified ambient air monitoring data for the 2009-2011 period, showing that the Area has monitored attainment of the 1997 annual PM2.5 NAAQS and 2006 24-hour PM2.5 NAAQS. The requirements for the Area to submit an attainment demonstration and associated reasonably available control measures (RACM), reasonable further progress (RFP) plans, contingency measures, and other planning State Implementation Plan (SIP) revisions related to attainment of the standards shall be suspended so long as the Area continues to attain the respective PM2.5 NAAQS.

  3. Northwest Forest Plan—the first 20 years (1994-2013): status and trends of northern spotted owl habitats

    Treesearch

    Raymond J. Davis; Bruce Hollen; Jeremy Hobson; Julia E. Gower; David. Keenum

    2016-01-01

    This is the third in a series of periodic monitoring reports on northern spotted owl (Strix occidentalis caurina) habitat status and trends on federally administered lands since implementation of the Northwest Forest Plan (NWFP) in 1994. The objective of this monitoring is to determine if the NWFP is providing for conservation and management of...

  4. 77 FR 5210 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-02

    .... SUMMARY: EPA is proposing to determine, pursuant to the Clean Air Act (CAA), that the bi-state St. Louis... replacement monitor be combined. Table 3--Design Values for Incomplete Data Monitors Compared to Highest... design values are used to compare against the NAAQS. Table 3 illustrates that the Arnold and Tenbrook and...

  5. 76 FR 15892 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... [mu]g/m\\3\\ for all missing data in 1st quarter of 2008. \\4\\ Macon SE Annual Mean considers data...; Georgia: Macon; Determination of Attaining Data for the 1997 Annual Fine Particulate Standards AGENCY... air monitoring data for the 2007-2009 period showing that the Area has monitored attainment of the...

  6. 76 FR 28393 - Proposed Approval of Air Quality Implementation Plan; Ohio and West Virginia; Determinations of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ... substituted for missing data. See 40 CFR Part 58, appendix D for network design criteria. EPA has approved the... certified ambient air monitoring data for the 2007-2009 period showing that the areas have monitored attainment of the annual PM 2.5 NAAQS. EPA also evaluated incomplete data from this period from other...

  7. 78 FR 44070 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Determinations of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... missing data. The linear regression relationship is based on time periods in which both monitors were... fill in missing data for the incomplete monitor, so that the normal data completeness requirement of 75 percent of data in each quarter of the three years is met. After the missing data for the site is filled...

  8. Strategic planning: a biomedical communications model.

    PubMed

    Barrett, J E

    1991-01-01

    This article describes a biomedical communications approach to strategic planning. This model produces a short-term plan that allows a department to take the competitive advantage, react to technological change, and make timely decisions on new courses of action. The model calls for self-study, involving staff in brainstorming sessions where options are identified and ideas are prioritized into possible strategies for success. The article recommends that an evaluation and monitoring schedule be implemented after decisions have been made.

  9. Annual Report of Monitoring at Barnes, Kansas, in 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    In 2006, the CCC/USDA assumed responsibility for the site investigation relating to potential carbon tetrachloride contamination. Initially, the CCC/USDA developed and implemented a work plan for targeted groundwater sampling and monitoring well installation (KDHE 2009). The investigation and subsequent monitoring (Argonne 2008a-d, 2009a,b, 2010, 2011, 2012, 2013, 2015a,b, 2016) were performed by the Environmental Science Division of Argonne National Laboratory. The reports of environmental investigations at Barnes are summarized.

  10. FutureGen 2.0 Monitoring Program: An Overview of the Monitoring Approach and Technologies Selected for Implementation

    DOE PAGES

    Vermeul, Vince R.; Strickland, Chris E.; Thorne, Paul D.; ...

    2014-12-31

    The FutureGen 2.0 Project will design and build a first-of-its-kind, near-zero emissions coal-fueled power plant with carbon capture and storage (CCS). To assess storage site performance and meet the regulatory requirements of the Class VI Underground Injection Control (UIC) Program for CO2 Geologic Sequestration, the FutureGen 2.0 project will implement a suite of monitoring technologies designed to 1) evaluate CO2 mass balance and 2) detect any unforeseen loss in CO2 containment. The monitoring program will include direct monitoring of the injection stream and reservoir, and early-leak-detection monitoring directly above the primary confining zone. It will also implement an adaptive monitoringmore » strategy whereby monitoring results are continually evaluated and the monitoring network is modified as required, including the option to drill additional wells in out-years. Wells will be monitored for changes in CO2 concentration and formation pressure, and other geochemical/isotopic signatures that provide indication of CO2 or brine leakage. Indirect geophysical monitoring technologies that were selected for implementation include passive seismic, integrated surface deformation, time-lapse gravity, and pulsed neutron capture logging. Near-surface monitoring approaches that have been initiated include surficial aquifer and surface- water monitoring, soil-gas monitoring, atmospheric monitoring, and hyperspectral data acquisition for assessment of vegetation conditions. Initially, only the collection of baseline data sets is planned; the need for additional near- surface monitoring will be continually evaluated throughout the design and operational phases of the project, and selected approaches may be reinstituted if conditions warrant. Given the current conceptual understanding of the subsurface environment, early and appreciable impacts to near-surface environments are not expected.« less

  11. Demographic and health surveillance of mobile pastoralists in Chad: integration of biometric fingerprint identification into a geographical information system.

    PubMed

    Weibel, Daniel; Schelling, Esther; Bonfoh, Bassirou; Utzinger, Jürg; Hattendorf, Jan; Abdoulaye, Mahamat; Madjiade, Toguina; Zinsstag, Jakob

    2008-11-01

    There is a pressing need for baseline demographic and health-related data to plan, implement and evaluate health interventions in developing countries, and to monitor progress towards international development goals. However, mobile pastoralists, i.e. people who depend on a livestock production system and follow their herds as they move, remain marginalized from rural development plans and interventions. The fact that mobile people are hard to reach and stay in contact with is a plausible reason why they are underrepresented in national censuses and/or alternative sequential sample survey systems. We present a proof-of-concept of monitoring highly mobile, pastoral people by recording demographic and health-related data from 933 women and 2020 children and establishing a biometric identification system (BIS) based on the registration and identification of digital fingerprints. Although only 22 women, representing 2.4% of the total registered women, were encountered twice in the four survey rounds, the approach implemented is shown to be feasible. The BIS described here is linked to a geographical information system to facilitate the creation of the first health and demographic surveillance system in a mobile, pastoralist setting. Our ultimate goal is to implement and monitor interventions with the "one health" concept, thus integrating and improving human, animal and ecosystem health.

  12. Using Geographical Information Systems (GIS) as an instrument of water resource management: a case study from a GIS-based Water Safety Plan in Germany.

    PubMed

    Wienand, I; Nolting, U; Kistemann, T

    2009-01-01

    Following international developments and the new WHO Drinking Water Guidelines (WHO 2004) a process-orientated concept for risk, monitoring and incident management has been developed and implemented in this study. The concept will be reviewed with special consideration for resource protection (first barrier of the multi-barrier system) and in turn, for the Water Safety Plan (WSP) which adequately considers-beyond the current framework of legal requirements-possible new hygienic-microbiologically relevant risks (especially emerging pathogens) for the drinking water supply. The development of a WSP within the framework of risk, monitoring and incident management includes the application of Geographical Information Systems (GIS). In the present study, GIS was used for visualization and spatial analysis in decisive steps in the WSP. The detailed process of GIS-supported implementation included the identification of local participants and their tasks and interactions as an essential part of risk management. A detailed ecological investigation of drinking water conditions in the catchment area was conducted in addition to hazard identification, risk assessment and the monitoring of control measures. The main task of our study was to find out in which steps of the WSP the implementation of GIS could be integrated as a useful, and perhaps even an essential tool.

  13. MONITORING AIR POLLUTION TRASPORT

    EPA Science Inventory

    The Advancements in the remote sensing of environmental conditions over the past decade have been recognized by governments around the world and led to the development of the international Global Earth Observation System of Systems (GEOSS) 10- Year Implementation Plan.

  14. MONITORING AIR POLLUTION TRANSPORT

    EPA Science Inventory

    The Advancements in the remote sensing of environmental conditions over the past decade have been recognized by governments around the world and led to the development of the international Global Earth Observation System of Systems (GEOSS) 10-Year Implementation Plan.

  15. WHTI Implementation Monitoring Plan to Assure Continued Travel and Trade Act of 2009

    THOMAS, 111th Congress

    Rep. Slaughter, Louise McIntosh [D-NY-28

    2009-06-02

    House - 06/17/2009 Referred to the Subcommittee on Border, Maritime, and Global Counterterrorism. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  16. Developing Tribal Integrated Waste Management Plans

    EPA Pesticide Factsheets

    An IWMP outlines how the tribe will reduce, manage, and dispose of its waste. It identifies existing waste systems, assesses needs, and sets forth the ways to design, implement, and monitor a more effective and sustainable waste management program.

  17. Plan for the Characterization of HIRF Effects on a Fault-Tolerant Computer Communication System

    NASA Technical Reports Server (NTRS)

    Torres-Pomales, Wilfredo; Malekpour, Mahyar R.; Miner, Paul S.; Koppen, Sandra V.

    2008-01-01

    This report presents the plan for the characterization of the effects of high intensity radiated fields on a prototype implementation of a fault-tolerant data communication system. Various configurations of the communication system will be tested. The prototype system is implemented using off-the-shelf devices. The system will be tested in a closed-loop configuration with extensive real-time monitoring. This test is intended to generate data suitable for the design of avionics health management systems, as well as redundancy management mechanisms and policies for robust distributed processing architectures.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less

  19. Lessons learned from the National Medicare & You Education Program.

    PubMed

    Goldstein, E; Teichman, L; Crawley, B; Gaumer, G; Joseph, C; Reardon, L

    2001-01-01

    In fall 1998 CMS implemented the National Medicare Education Program (NMEP) to educate beneficiaries about their Medicare program benefits; health plan choices; supplemental health insurance; beneficiary rights, responsibilities, and protections; and health behaviors. CMS has been monitoring the implementation of the NMEP in six case study sites as well as monitoring each of the information channels for communicating with beneficiaries. This article describes select findings from the case studies, and highlights from assessment activities related to the Medicare & You handbook, the toll-free 1-800-MEDICARE Helpline, Internet, and Regional Education About Choices in Health (REACH).

  20. Lessons Learned from the National Medicare & You Education Program

    PubMed Central

    Goldstein, Elizabeth; Teichman, Lori; Crawley, Barbara; Gaumer, Gary; Joseph, Catherine; Reardon, Leo

    2001-01-01

    In fall 1998 CMS implemented the National Medicare Education Program (NMEP) to educate beneficiaries about their Medicare program benefits; health plan choices; supplemental health insurance; beneficiary rights, responsibilities, and protections; and health behaviors. CMS has been monitoring the implementation of the NMEP in six case study sites as well as monitoring each of the information channels for communicating with beneficiaries. This article describes select findings from the case studies, and highlights from assessment activities related to the Medicare & You handbook, the toll-free 1-800-MEDICARE Helpline, Internet, and Regional Education About Choices in Health (REACH). PMID:12500359

  1. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peelle, E.; Schweitzer, M.; Scharre, P.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possiblemore » through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.« less

  2. Contingency plan to provide safe drinking water for the city of Milan, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Talbot, J.J.; Brew, P.

    1994-12-31

    The city of Milan, in western Tennessee, supplies drinking water to approximately 4,000 customers. Environmental investigations conducted by the US Army have detected low concentrations of RDX, a compound used in the manufacture of explosives, in two of the three city water supply wells. The RDX is traceable to the Milan Army Ammunition Plant nearby. The levels of RDX are being monitored and current trends indicate that levels in the wells will exceed the EPA Health Advisory Limits in the near term. In order to ensure an uninterrupted supply of acceptable quality drinking water for the city residents, the Armymore » prepared and is implementing a Contingency Plan. The plan evaluated remedial alternatives to be implemented once a trigger level of RDX is reached, including institutional controls, installation of an RDX treatment system for the water supply system, and construction of a new well field. Institutional controls include: shutting down existing wells; continued monitoring; and promulgation of ground water ordinances. Treatment technologies evaluated include: ultraviolet light and hydrogen peroxide; or removal using granular activated carbon.« less

  3. Hungry Horse Dam Wildlife Habitat Enhancement Project: Long-Term Habitat Management Plan, Elk and Mule Deer Winter Range Enhancement, Firefighter Mountain and Spotted Bear Winter Ranges.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    1990-06-01

    Project goals are to rehabilitate 1120 acres of big game (elk and mule deer, Odocoileus hemionus) winter range on the Hungry Horse and Spotted Bear Districts of Flathead National Forest lands adjacent to Hungry Horse Reservoir. This project represents the initial phase of implementation toward the mitigation goal. A minimum of 547 acres Trust-funded enhancements are called for in this plan. The remainder are part of the typical Forest Service management activities for the project area. Monitor and evaluate the effects of project implementation on the big game forage base and elk and mule deer populations in the project area.more » Monitor enhancement success to determine effective acreage to be credited against mitigation goal. Additional enhancement acreage will be selected elsewhere in the Flathead Forest or other lands adjacent'' to the reservoir based on progress toward the mitigation goal as determined through monitoring. The Wildlife Mitigation Trust Fund Advisory Committee will serve to guide decisions regarding future enhancement efforts. 7 refs.« less

  4. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Johnson, Jill W. (Compiler)

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

  5. [Compliance with guidelines by state plans for food and nutritional security in Brazil].

    PubMed

    Machado, Mick Lennon; Gabriel, Cristine Garcia; Soar, Claudia; Mamed, Gisele Rockenbach; Machado, Patrícia Maria de Oliveira; Lacerda, Josimari Telino de; Martins, Milena Corrêa; Marcon, Maria Cristina

    2018-02-05

    A descriptive and documental study was performed from August to October 2016 to analyze compliance by state plans for food and nutritional security (PlanSAN) with the guidelines set by the Brazilian National Policy for Food and Nutritional Security (PNSAN). The state plans were accessed via the websites of the Inter-Ministerial Chamber for Food and Nutritional Security (CAISAN) or the state governments, plus complementary data collection at the state level. All the states of Brazil joined the National System for Food and Nutritional Security (SISAN), while fewer than half (13 states, 48%) had drafted their plans. Of these, 5 (38%) of the PlanSAN had schedules that coincided with the same state's pluriannual plan, 5 (38%) of the PlanSAN specified the budget requirements for meeting the proposed targets, 7 (54%) specified mechanisms for monitoring the plan, and only 2 (15%) defined methodologies for monitoring food and nutritional security. The recent existence of (and adherence to) the CAISAN appear to be related to the lack of state plans in half the states. Although most of the states that did have plans met some of the guidelines laid out by the PNSAN, these mechanisms become weak and impractical when they lack earmarked budget funds to meet their targets. Since the PNSAN is structurally inter-sectorial, the development of plans requires collective work by various government departments. Importantly, the items analyzed here are all guidelines, which implies the need for mechanisms to monitor their actual implementation.

  6. 40 CFR 49.23 - Federal Implementation Plan Provisions for Four Corners Power Plant, Navajo Nation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... recertification events. When valid SO2 pounds per hour, NO2 pounds per hour, or NO2 pounds per million Btu... approval. (ii) In the event that the owner or operator is unable to develop the plan required in paragraph... requested by the Regional Administrator. (vii) In the event that a program for parameter monitoring on Units...

  7. 40 CFR 49.23 - Federal Implementation Plan Provisions for Four Corners Power Plant, Navajo Nation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... recertification events. When valid SO2 pounds per hour, NO2 pounds per hour, or NO2 pounds per million Btu... approval. (ii) In the event that the owner or operator is unable to develop the plan required in paragraph... requested by the Regional Administrator. (vii) In the event that a program for parameter monitoring on Units...

  8. Northwest Forest Plan—the first 10 years (1994–2003): status and trends of northern spotted owl populations and habitat.

    Treesearch

    Joseph Lint

    2005-01-01

    This report presents results from monitoring spotted owl (Strix occidentalis caurina) populations and habitat during the first 10 years of implementation of the Northwest Forest Plan (the Plan). Estimated population decline ranged from 0 to 10 percent across study areas (weighted average of 3.4 percent) annually. The average annual rate of decline...

  9. Northwest Forest Plan—the first 10 years: socioeconomic monitoring of the Olympic National Forest and three local communities.

    Treesearch

    Lita P. Buttolph; William Kay; Susan Charnley; Cassandra Moseley; Ellen M. Donoghue

    2006-01-01

    This report examines socioeconomic changes that occurred between 1990 and 2000 associated with implementation of the Northwest Forest Plan (the Plan) in the Olympic National Forest in western Washington. We used a combination of quantitative data from the U.S. census and the USDA Forest Service, historical documents, and interviews from Forest Service employees and...

  10. Executing the double win: protect your cash flow during a patient accounting system install.

    PubMed

    Adams, Jason L; Smith, J Cathy; Strand, Brett

    2009-09-01

    MultiCare Health System's plan for ensuring that its patient accounting system implementation would bring rapid financial benefits comprised eight basic steps: Set baselines and establish goals. Identify key leadership stakeholders across departmental lines. Identify team resources. Establish roles and responsibilities. Identify and prepare for potential risks. Develop guiding principles. Develop key reporting and monitoring tools. Conduct daily monitoring.

  11. Establishing a nationwide baseline of historical burn-severity data to support monitoring of trends in wildfire effects and national fire policies

    Treesearch

    Brian Schwind; Brad Quayle; Jeffery C. Eidenshink

    2010-01-01

    There is a need to provide agency leaders, elected officials, and the general public with summary information regarding the effects of large wildfires. Recently, the Wildland Fire Leadership Council (WFLC), which implements and coordinates National Fire Plan (NFP) and Federal Wildland Fire Management Policies adopted a strategy to monitor the effectiveness and effects...

  12. 78 FR 54828 - Promulgation of State Implementation Plan Revisions; Infrastructure Requirements for the 1997 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...- oriented monitors, and 65 [mu]g/m\\3\\, based on the three-year average of the 98th percentile of 24-hour PM 2.5 concentrations at each population-oriented monitor within an area (62 FR 38652). On October 17...)(2)(G): Emergency powers. 110(a)(2)(H): Future SIP revisions. 110(a)(2)(J): Consultation with...

  13. Conceptual Problems.

    ERIC Educational Resources Information Center

    Foley, Walter J.

    A systems theory approach to information requirements in education and in evaluation strategies is applied to decision making. Educational decision making itself involves long range planning, system structuring to implement goals, system allocation (cost), and system monitoring which provides the feedback. Each level requires differential…

  14. Continued monitoring of instrumented pavement in Ohio : research implementation plan.

    DOT National Transportation Integrated Search

    2006-02-01

    Beginning in 1992, the Ohio Department of Transportation has sponsored several research projects to measure the : response of various highway pavement structures over a range of environmental and loading conditions. Much of : these response data were...

  15. Continued Monitoring of Instrumented Pavement in Ohio : Research Implementation Plan

    DOT National Transportation Integrated Search

    2006-02-14

    Beginning in 1992, the Ohio Department of Transportation has sponsored several research projects to measure the response of various highway pavement structures over a range of environmental and loading conditions. Much of these response data were col...

  16. Designing-and Redesigning-Information Services for Maximum Impact.

    ERIC Educational Resources Information Center

    Jones, Rebecca; Dysart, Jane

    2002-01-01

    Discusses innovative information services, including new services and the redesign of existing services. Describes the development process, including assessing the market and developing a marketing plan; and explains the implementation process, including monitoring client satisfaction and quality control. (LRW)

  17. Preliminary monitoring protocol for the tidal freshwater wetland restoration herbivory study in national capital parks--east: Appendix B

    USGS Publications Warehouse

    Krafft, Cairn; Hatfield, Jeffrey S.

    2014-01-01

    Four tidal freshwater wetland restoration projects have been undertaken within Anacostia Park on lands managed by the National Park Service since 1993. Monitoring the impacts of Canada goose (Branta canadensis) herbivory on the wetland vegetation will play a key role in determining the long-term health of these tidal freshwater wetland restorations. This Implementation Plan lays out monitoring for impacts of herbivory on the vegetation in Kingman Area 1 and inferred to the other wetland areas.

  18. The Method of Multiple Spatial Planning Basic Map

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  19. Sitewide monitoring at Agra, Kansas, June 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    In 1985, carbon tetrachloride was discovered in the groundwater at Agra, Kansas, during routine sampling of public water supply wells. Two of Agra's four public water supply wells contained low but detectable levels of carbon tetrachloride; the concentrations in wells PWS-3 and PWS-4 exceeded the maximum contaminant level. These wells were removed from service in 1986, although they remain available for uses other than drinking water. Other public wells, outside the area of contamination, supply drinking water for the city of Agra. In 1987-2005, the Kansas Department of Health and Environment (KDHE) and the Commodity Credit Corporation of the U.S.more » Department of Agriculture (CCC/USDA) conducted investigations to delineate the contaminant plume and to identify source areas for the contamination - which results from the past use of grain fumigants containing carbon tetrachloride. Source areas were identified on the former CCC/USDA grain storage facility property and on the Producers Agricultural Marketing Association, Inc., property located to the south (Argonne 2006). The contaminant plume extends to the southeast, toward well PWS-3, from the identified source areas. Both the CCC/USDA and Pro-Ag Marketing are currently implementing KDHE-approved interim measures (IMs). To address the contamination identified on its former property, the CCC/USDA is implementing a source control IM consisting of large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparging (AS). Pro-Ag Marketing plans to use groundwater extraction to address the downgradient plume. The CCC/USDA and Pro-Ag completed installation of the two interim measures in May 2009 and August 2009, respectively. The performance and assessments of the effectiveness of the IMs are being reported separately by the responsible entities. As part of the IM process, the KDHE (2008) requested the development of a joint sitewide groundwater monitoring plan to allow periodic assessment of the effectiveness of the separate IMs being implemented by the CCC/USDA and Pro-Ag, through monitoring of the level of contamination and the resulting change in both the extent and internal configuration of the downgradient plume. A Joint Work Plan for Sitewide Monitoring was developed by the CCC/USDA through its technical consultant, Argonne National Laboratory, and was reviewed, approved, and signed by Pro-Ag Marketing and subsequently submitted to the KDHE on May 12, 2009. The KDHE (2009a) provided comments on the Joint Work Plan on May 27, 2009, requesting submission of a revised version. To minimize delays, the KDHE allowed the CCC/USDA to proceed with the scheduled annual sampling proposed in the Joint Work Plan. The sampling was to be conducted according to the previously approved low-flow sampling methodology (Argonne 2009). Argonne conducted the first annual sampling event for the CCC/USDA on June 15-16, 2009. The finalized, signed version of the Joint Work Plan provided to the KDHE on November 9, 2009, is in Appendix A. Table 1.1 lists the monitoring and public water supply wells to be sampled under the Joint Work Plan, plus the wells being sampled to monitor the respective IMs. The entity responsible for each monitoring element is indicated, along with well completion dates and well registration numbers. The subject of this report is the initial sitewide groundwater sampling event that occurred on June 15-16, 2009, under the Joint Work Plan.« less

  20. The Elements of an Effective Software Development Plan - Software Development Process Guidebook

    DTIC Science & Technology

    2011-11-11

    standards and practices required for all XMPL software development. This SDP implements the <corporate> Standard Software Process (SSP). as tailored...Developing and integrating reusable software products • Approach to managing COTS/Reuse software implementation • COTS/Reuse software selection...final selection and submit to change board for approval MAINTENANCE Monitor current products for obsolescence or end of support Track new

  1. Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.

    1988-02-01

    In 1970, the US Atomic Energy Commission established a transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containingmore » mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs.« less

  2. Vital signs monitoring on general wards: clinical staff perceptions of current practices and the planned introduction of continuous monitoring technology.

    PubMed

    Prgomet, Mirela; Cardona-Morrell, Magnolia; Nicholson, Margaret; Lake, Rebecca; Long, Janet; Westbrook, Johanna; Braithwaite, Jeffrey; Hillman, Ken

    2016-09-01

    Early detection of patient deterioration and prevention of adverse events are key challenges to patient safety. This study investigated clinical staff perceptions of current monitoring practices and the planned introduction of continuous monitoring devices on general wards. Multi-method study comprising structured surveys, in-depth interviews and device trial with log book feedback. Two general wards in a large urban teaching hospital in Sydney, Australia. Respiratory and neurosurgery nursing staff and two doctors. Nurses were confident about their abilities to identify patients at risk of deterioration, using a combination of vital signs and visual assessment. There were concerns about the accuracy of current vital signs monitoring equipment and frequency of intermittent observation. Both the nurses and the doctors were enthusiastic about the prospect of continuous monitoring and perceived it would allow earlier identification of patient deterioration; provide reassurance to patients; and support interdisciplinary communication. There were also reservations about continuous monitoring, including potential decrease in bedside nurse-patient interactions; increase in inappropriate escalations of patient care; and discomfort to patients. While continuous monitoring devices were seen as a potentially positive tool to support the identification of patient deterioration, drawbacks, such as the potential for reduced patient contact, revealed key areas that will require close surveillance following the implementation of devices. Training and improved interdisciplinary communication were identified as key requisites for successful implementation. © The Author 2016. Published by Oxford University Press in association with the International Society for Quality in Health Care. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  3. Study protocol for evaluating the implementation and effectiveness of an emergency department longitudinal patient monitoring system using a mixed-methods approach.

    PubMed

    Ward, Marie; McAuliffe, Eilish; Wakai, Abel; Geary, Una; Browne, John; Deasy, Conor; Schull, Michael; Boland, Fiona; McDaid, Fiona; Coughlan, Eoin; O'Sullivan, Ronan

    2017-01-23

    Early detection of patient deterioration is a key element of patient safety as it allows timely clinical intervention and potential rescue, thus reducing the risks of serious patient safety incidents. Longitudinal patient monitoring systems have been widely recommended for use to detect clinical deterioration. However, there is conflicting evidence on whether they improve patient outcomes. This may in part be related to variation in the rigour with which they are implemented and evaluated. This study aims to evaluate the implementation and effectiveness of a longitudinal patient monitoring system designed for adult patients in the unique environment of the Emergency Department (ED). A novel participatory action research (PAR) approach is taken where socio-technical systems (STS) theory and analysis informs the implementation through the improvement methodology of 'Plan Do Study Act' (PDSA) cycles. We hypothesise that conducting an STS analysis of the ED before beginning the PDSA cycles will provide for a much richer understanding of the current situation and possible challenges to implementing the ED-specific longitudinal patient monitoring system. This methodology will enable both a process and an outcome evaluation of implementing the ED-specific longitudinal patient monitoring system. Process evaluations can help distinguish between interventions that have inherent faults and those that are badly executed. Over 1.2 million patients attend EDs annually in Ireland; the successful implementation of an ED-specific longitudinal patient monitoring system has the potential to affect the care of a significant number of such patients. To the best of our knowledge, this is the first study combining PAR, STS and multiple PDSA cycles to evaluate the implementation of an ED-specific longitudinal patient monitoring system and to determine (through process and outcome evaluation) whether this system can significantly improve patient outcomes by early detection and appropriate intervention for patients at risk of clinical deterioration.

  4. A Total Quality-Control Plan with Right-Sized Statistical Quality-Control.

    PubMed

    Westgard, James O

    2017-03-01

    A new Clinical Laboratory Improvement Amendments option for risk-based quality-control (QC) plans became effective in January, 2016. Called an Individualized QC Plan, this option requires the laboratory to perform a risk assessment, develop a QC plan, and implement a QC program to monitor ongoing performance of the QC plan. Difficulties in performing a risk assessment may limit validity of an Individualized QC Plan. A better alternative is to develop a Total QC Plan including a right-sized statistical QC procedure to detect medically important errors. Westgard Sigma Rules provides a simple way to select the right control rules and the right number of control measurements. Copyright © 2016 Elsevier Inc. All rights reserved.

  5. Automatic vehicle monitoring systems study. Report of phase O. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A set of planning guidelines is presented to help law enforcement agencies and vehicle fleet operators decide which automatic vehicle monitoring (AVM) system could best meet their performance requirements. Improvements in emergency response times and resultant cost benefits obtainable with various operational and planned AVM systems may be synthesized and simulated by means of special computer programs for model city parameters applicable to small, medium, and large urban areas. Design characteristics of various AVM systems and the implementation requirements are illustrated and cost estimated for the vehicles, the fixed sites, and the base equipments. Vehicle location accuracies for different RF links and polling intervals are analyzed.

  6. Northwest Montana Wildlife Habitat Enhancement: Hungry Horse Elk Mitigation Project: Monitoring and Evaluation Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel; Malta, Patrick

    Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less

  7. Groundwater monitoring well assessment final work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less

  8. Towards a global terrestrial species monitoring program

    USGS Publications Warehouse

    Schmeller, Dirk S.; Julliard, Romain; Bellingham, Peter J.; Böhm, Monika; Brummitt, Neil; Chiarucci, Alessandro; Couvet, Denis; Elmendorf, Sarah; Forsyth, David M.; Moreno, Jaime García; Gregory, Richard D.; Magnusson, William E.; Martin, Laura J.; McGeoch, Melodie A.; Mihoub, Jean-Baptiste; Pereira, Henrique M.; Proença, Vânia; van Swaay, Chris A.M.; Yahara, Tetsukazu; Belnap, Jayne

    2015-01-01

    Introduction: The Convention for Biological Diversity’s (CBD) Strategic Plan for Biodiversity 2011-2020 envisions that “By 2050, biodiversity is valued, conserved, restored and wisely used, maintaining ecosystem services, sustaining a healthy planet and delivering benefits essential for all people.” Although 193 parties have adopted these goals, there is little infrastructure in place to monitor global biodiversity trends. Recent international conservation policy requires such data to be up-to-date, reliable, comparable among sites, relevant, and understandable; as is becoming obvious from the work plan adopted by the Intergovernmental Panel for Biodiversity and Ecosystem Services (IPBES: www.ipbes.net/; http://tinyurl.com/ohdnknq). In order to meet the five strategic goals of the Strategic Plan for Biodiversity 2011-2020 and its 20 accompanying Aichi Targets for 2020 (www.cbd.int/sp/targets/), advances need to be made in coordinating large-scale biodiversity monitoring and linking these with environmental data to develop a comprehensive Global Observation Network, as is the main idea behind GEOSS the Global Earth Observation System of Systems (Christian 2005)...Here we identify ten requirements important for the successful implementation of a global biodiversity monitoring network under the flag of GEO BON and especially a global terrestrial species monitoring program.

  9. Social Impact Management Plans: Innovation in corporate and public policy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Franks, Daniel M., E-mail: d.franks@uq.edu.au; Vanclay, Frank, E-mail: frank.vanclay@rug.nl

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples aremore » analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community. • SIMPs link assessment to ongoing management and address social and community issues. • SIMPs clarify responsibilities in the management of impacts, opportunities and risks. • SIMPs demonstrate a shift to include management as a core component of SIA practice.« less

  10. Space Station Freedom Environmental Health Care Program

    NASA Technical Reports Server (NTRS)

    Richard, Elizabeth E.; Russo, Dane M.

    1992-01-01

    The paper discusses the environmental planning and monitoring aspects of the Space Station Freedom (SSF) Environmental Health Care Program, which encompasses all phases of the SSF assembly and operation from the first element entry at MB-6 through the Permanent Manned Capability and beyond. Environmental planning involves the definition of acceptability limits and monitoring requirements for the radiation dose barothermal parameters and potential contaminants in the SSF air and water and on internal surfaces. Inflight monitoring will be implemented through the Environmental Health System, which consists of five subsystems: Microbiology, Toxicology, Water Quality, Radiation, and Barothermal Physiology. In addition to the environmental data interpretation and analysis conducted after each mission, the new data will be compared to archived data for statistical and long-term trend analysis and determination of risk exposures. Results of these analyses will be used to modify the acceptability limits and monitoring requirements for the future.

  11. Task-level control for autonomous robots

    NASA Technical Reports Server (NTRS)

    Simmons, Reid

    1994-01-01

    Task-level control refers to the integration and coordination of planning, perception, and real-time control to achieve given high-level goals. Autonomous mobile robots need task-level control to effectively achieve complex tasks in uncertain, dynamic environments. This paper describes the Task Control Architecture (TCA), an implemented system that provides commonly needed constructs for task-level control. Facilities provided by TCA include distributed communication, task decomposition and sequencing, resource management, monitoring and exception handling. TCA supports a design methodology in which robot systems are developed incrementally, starting first with deliberative plans that work in nominal situations, and then layering them with reactive behaviors that monitor plan execution and handle exceptions. To further support this approach, design and analysis tools are under development to provide ways of graphically viewing the system and validating its behavior.

  12. From plans to actions in patient and public involvement: qualitative study of documented plans and the accounts of researchers and patients sampled from a cohort of clinical trials

    PubMed Central

    Buck, Deborah; Gamble, Carrol; Dudley, Louise; Preston, Jennifer; Hanley, Bec; Williamson, Paula R; Young, Bridget

    2014-01-01

    Patient and public involvement (PPI) in research is increasingly required, although evidence to inform its implementation is limited. Objective Inform the evidence base by describing how plans for PPI were implemented within clinical trials and identifying the challenges and lessons learnt by research teams. Methods We compared PPI plans extracted from clinical trial grant applications (funded by the National Institute for Health Research Health Technology Assessment Programme between 2006 and 2010) with researchers’ and PPI contributors’ interview accounts of PPI implementation. Analysis of PPI plans and transcribed qualitative interviews drew on the Framework technique. Results Of 28 trials, 25 documented plans for PPI in funding applications and half described implementing PPI before applying for funding. Plans varied from minimal to extensive, although almost all anticipated multiple modes of PPI. Interview accounts indicated that PPI plans had been fully implemented in 20/25 trials and even expanded in some. Nevertheless, some researchers described PPI within their trials as tokenistic. Researchers and contributors noted that late or minimal PPI engagement diminished its value. Both groups perceived uncertainty about roles in relation to PPI, and noted contributors’ lack of confidence and difficulties attending meetings. PPI contributors experienced problems in interacting with researchers and understanding technical language. Researchers reported difficulties finding ‘the right’ PPI contributors, and advised caution when involving investigators’ current patients. Conclusions Engaging PPI contributors early and ensuring ongoing clarity about their activities, roles and goals, is crucial to PPI's success. Funders, reviewers and regulators should recognise the value of preapplication PPI and allocate further resources to it. They should also consider whether PPI plans in grant applications match a trial's distinct needs. Monitoring and reporting PPI before, during and after trials will help the research community to optimise PPI, although the need for ongoing flexibility in implementing PPI should also be recognised. PMID:25475243

  13. Quarterly report on Defense Nuclear Facilities Safety Board Recommendation 90-7 for the period ending December 31, 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cash, R.J.; Dukelow, G.T.; Forbes, C.J.

    1993-03-01

    This is the seventh quarterly report on the progress of activities addressing safety issues associated with Hanford Site high-level radioactive waste tanks that contain ferrocyanide compounds. In the presence of oxidizing materials, such as nitrates or nitrites, ferrocyanide can be made to explode in the laboratory by heating it to high temperatures [above 285{degrees}C (545{degrees}F)]. In the mid 1950s approximately 140 metric tons of ferrocyanide were added to 24 underground high-level radioactive waste tanks. An implementation plan (Cash 1991) responding to the Defense Nuclear Facilities Safety Board Recommendation 90-7 (FR 1990) was issued in March 1991 describing the activities thatmore » were planned and underway to address each of the six parts of Recommendation 90-7. A revision to the original plan was transmitted to US Department of Energy by Westinghouse Hanford Company in December 1992. Milestones completed this quarter are described in this report. Contents of this report include: Introduction; Defense Nuclear Facilities Safety Board Implementation Plan Task Activities (Defense Nuclear Facilities Safety Board Recommendation for enhanced temperature measurement, Recommendation for continuous temperature monitoring, Recommendation for cover gas monitoring, Recommendation for ferrocyanide waste characterization, Recommendation for chemical reaction studies, and Recommendation for emergency response planning); Schedules; and References. All actions recommended by the Defense Nuclear Facilities Safety Board for emergency planning by Hanford Site emergency preparedness organizations have been completed.« less

  14. Understanding Climate Adaptation on Public Lands in the Upper Midwest: Implications for Monitoring and Tracking Progress

    NASA Astrophysics Data System (ADS)

    Anhalt-Depies, Christine M.; Knoot, Tricia Gorby; Rissman, Adena R.; Sharp, Anthony K.; Martin, Karl J.

    2016-05-01

    There are limited examples of efforts to systematically monitor and track climate change adaptation progress in the context of natural resource management, despite substantial investments in adaptation initiatives. To better understand the status of adaptation within state natural resource agencies, we utilized and problematized a rational decision-making framework to characterize adaptation at the level of public land managers in the Upper Midwest. We conducted in-depth interviews with 29 biologists and foresters to provide an understanding of managers' experiences with, and perceptions of, climate change impacts, efforts towards planning for climate change, and a full range of actions implemented to address climate change. While the majority of managers identified climate change impacts affecting their region, they expressed significant uncertainty in interpreting those signals. Just under half of managers indicated planning efforts are underway, although most planning is remote from local management. Actions already implemented include both forward-looking measures and those aimed at coping with current impacts. In addition, cross-scale dynamics emerged as an important theme related to the overall adaptation process. The results hold implications for tracking future progress on climate change adaptation. Common definitions or measures of adaptation (e.g., presence of planning documents) may need to be reassessed for applicability at the level of public land managers.

  15. Understanding Climate Adaptation on Public Lands in the Upper Midwest: Implications for Monitoring and Tracking Progress.

    PubMed

    Anhalt-Depies, Christine M; Knoot, Tricia Gorby; Rissman, Adena R; Sharp, Anthony K; Martin, Karl J

    2016-05-01

    There are limited examples of efforts to systematically monitor and track climate change adaptation progress in the context of natural resource management, despite substantial investments in adaptation initiatives. To better understand the status of adaptation within state natural resource agencies, we utilized and problematized a rational decision-making framework to characterize adaptation at the level of public land managers in the Upper Midwest. We conducted in-depth interviews with 29 biologists and foresters to provide an understanding of managers' experiences with, and perceptions of, climate change impacts, efforts towards planning for climate change, and a full range of actions implemented to address climate change. While the majority of managers identified climate change impacts affecting their region, they expressed significant uncertainty in interpreting those signals. Just under half of managers indicated planning efforts are underway, although most planning is remote from local management. Actions already implemented include both forward-looking measures and those aimed at coping with current impacts. In addition, cross-scale dynamics emerged as an important theme related to the overall adaptation process. The results hold implications for tracking future progress on climate change adaptation. Common definitions or measures of adaptation (e.g., presence of planning documents) may need to be reassessed for applicability at the level of public land managers.

  16. A patient self-assessment tool for cardiac rehabilitation.

    PubMed

    Phelan, C; Finnell, M D; Mottla, K A

    1989-01-01

    A patient self-assessment tool was designed, tested, and implemented to promote cardiac-specific data collection, based on Gordon's Functional Health Patterns, to maximize patient/family involvement in determining a plan of care, and to streamline primary nurses' documentation requirements. Retrospective and concurrent chart reviews provided data for quality assurance monitoring. The results of the monitoring demonstrated that the self-assessment tool markedly improved the patient-specific data base.

  17. 76 FR 31900 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... considers data substitution of 58.1 [mu]g/m\\3\\ for all missing data in 1st quarter of 2008. \\4\\ Macon SE... on March 22, 2011, and were based on quality-assured and certified monitoring data for the 2007--2009... and certified monitoring data for 2007-2009, and in accordance with section 179(c)(1) of the CAA and...

  18. Network Monitoring: A 360-Degree Plan--Learn How to Get the Vital Feedback You Need to Make Your System--And Its Users--More Secure

    ERIC Educational Resources Information Center

    Miller, Steven E.; Seiberling, Chris

    2004-01-01

    This article represents the second part of a series in this journal called "How to Perform a Security Audit." It continues the conversation on setting up a process for identifying security-related concerns and implementation safeguards. It continues the conversation from the perspective of system monitoring. This article discusses how to use a…

  19. Ecological effects of contaminants in McCoy Branch, 1989-1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ryon, M.G.

    1992-01-01

    The 1984 Hazardous and Solid Waste Amendments to the Resource Conservation and Recovery Act (RCRA) required assessment of all current and former solid waste management units. Such a RCRA Facility Investigation (RFI) was required of the Y-12 Plant for their Filled Coal Ash Pond on McCoy Branch. Because the disposal of coal ash in the ash pond, McCoy Branch, and Rogers Quarry was not consistent with the Tennessee Water Quality Act, several remediation steps were implemented or planned for McCoy Branch to address disposal problems. The McCoy Branch RFI plan included provisions for biological monitoring of the McCoy Branch watershed.more » The objectives of the biological monitoring were to: (1) document changes in biological quality of McCoy Branch after completion of a pipeline and after termination of all discharges to Rogers Quarry, (2) provide guidance on the need for additional remediation, and (3) evaluate the effectiveness of implemented remedial actions. The data from the biological monitoring program will also determine if the classified uses, as identified by the State of Tennessee, of McCoy Branch are being protected and maintained. This report discusses results from toxicity monitoring of snails fish community assessment, and a Benthic macroinvertebrate community assessment.« less

  20. Ahead with Cairo. Monitoring country activities.

    PubMed

    Danguilan, M; Wainer, J; Widyantoro, N; Capoor, I; Huq, N; Ashino, Y; Sadasivam, B; Le Thi Nham Tuyet

    1995-04-01

    In the aftermath of the 1994 UN Conference on Population and Development (ICPD) in Cairo, countries are proceeding with their implementation of the plan of action adopted at the conference. A brief description is given of some actions taken by specific countries toward plan implementation. In the Philippines meetings were held immediately after the conference in October on the implications for the Management, Family Planning, and Nongovernmental Organizations programs. The issues of concern were identified as the need for regular consultative meetings among relevant agencies, consultations with women's groups, and a responsive adolescents program. In Australia the program thrust was to focus on the implications for immigration. Monitoring of the plans of action will be undertaken by nongovernmental organizations (NGOs). In Malaysia committees are preparing a program of action suitable for implementation in Malaysia. A regional women's NGO organized a forum on the implications of ICPD for women's reproductive health, women's rights, and empowerment in Malaysia. In Vietnam, press conferences are used to communicate conference results. An NGO translated relevant ICPD materials into Vietnamese. In Indonesia, several ministries convened meetings among donors, NGOs, women's groups, and experts. In India, the government held a national conference. One view was that population issues should be discussed in the context of gender equality and empowerment of women. Another issue was the importance of placing reproductive health in the larger context of health and primary health services. Health personnel at all levels were considered in need of sensitization on gender issues. Problems such as anemia have not been successfully addressed in existing programs. The government agreed to remove in phases target driven programs and the sterilization emphasis. In Bangladesh, a national committee was formed, and NGOs are actively distributing information. In Japan, the Family Planning Federation in a collaborative effort is actively promoting concrete actions.

  1. Consumers, health insurance and dominated choices.

    PubMed

    Sinaiko, Anna D; Hirth, Richard A

    2011-03-01

    We analyze employee health plan choices when the choice set offered by their employer includes a dominated plan. During our study period, one-third of workers were enrolled in the dominated plan. Some may have selected the plan before it was dominated and then failed to switch out of it. However, a substantial number actively chose the dominated plan when they had an unambiguously better choice. These results suggest limitations in the ability of health reform based solely on consumer choice to achieve efficient outcomes and that implementation of health reform should anticipate, monitor and account for this consumer behavior. Copyright © 2011 Elsevier B.V. All rights reserved.

  2. A Modernized System for Agricultural Monitoring for Food Security in Tanzania

    NASA Astrophysics Data System (ADS)

    Dempewolf, J.; Nakalembe, C. L.; Becker-Reshef, I.; Justice, C. J.; Tumbo, S.; Mbilinyi, B.; Maurice, S.; Mtalo, M.

    2016-12-01

    Accurate and timely information on agriculture, particularly in many countries dominated by complex smallholder, subsistence agricultural systems is often difficult to obtain or not available. This includes up-to-date information during the growing season on crop type, crop area and crop condition such as developmental stage, damage from pests and diseases, drought or flooding. These data are critical for government decision making on production forecasts, planning for commodity market transactions, food aid delivery, responding to disease outbreaks and for implementing agricultural extension and development efforts. In Tanzania we have been working closely with the National Food Security Division (NFSD) at the Ministry of Agriculture, Livestock and Fisheries (MALF) on designing and implementing an advanced agricultural monitoring system, utilizing satellite remote sensing, smart phone and internet technologies. Together with our local implementing partner, the Sokoine University of Agriculture we trained a large number of agricultural extension agents in different regions of Tanzania to deliver field data in near-realtime. Using our collaborative internet portal (Crop Monitor) the team of analysts compiles pertinent information on current crop and weather conditions from throughout the country in a standardized, consistent manner. Using the portal traditionally collected data are combined with electronically collected field data and MODIS satellite image time series from GLAM East-Africa (Global Agricultural Monitoring System, customized for stakeholders in East Africa). The main outcome of this work has been the compilation of the National Food Security Bulletin for Tanzania with plans for a public release and the intention for it to become the main avenue to dispense current updates and analysis on agriculture in the country. The same information is also a potential contribution to the international Early Warning Crop Monitor, which currently covers Tanzania mainly through assessments provided by international agencies.

  3. New technology planning and approval: critical factors for success.

    PubMed

    Haselkorn, Ateret; Rosenstein, Alan H; Rao, Anil K; Van Zuiden, Michele; Coye, Molly J

    2007-01-01

    The steady evolution of technology, with the associated increased costs, is a major factor affecting health care delivery. In the face of limited capital resources, it is important for hospitals to integrate technology management with the strategic plan, mission, and resource availability of the organization. Experiences in technology management have shown that having a well-organized, consistent approach to technology planning, assessment, committee membership, approval, evaluation, implementation, and monitoring are key factors necessary to ensure a successful program. We examined the results of a survey that assessed the structure, processes, and cultural support behind hospital committees for new technology planning and approval.

  4. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: FY 1999 Watershed Restoration Projects : Annual Report 1999.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, Shawn W.

    2001-03-01

    The John Day River is the second longest free-flowing river in the contiguous United States and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band,more » westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1999, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional eleven (11) watershed conservation projects. The types of projects implemented included installation of infiltration galleries, permanent diversions, pumping stations, and irrigation efficiency upgrades. Project costs in 1999 totaled $284,514.00 with a total amount of $141,628.00 (50%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Confederated Tribes of Warm Springs, Oregon Watershed Enhancement Board, and individual landowners.« less

  5. Coastwide Reference Monitoring System (CRMS) Vegetation Volume Index: An assessment tool for marsh habitat focused on the three-dimensional structure at CRMS vegetation monitoring stations

    USGS Publications Warehouse

    Wood, William B.; Visser, Jenneke M.; Piazza, Sarai C.; Sharp, Leigh A.; Hundy, Laura C.; McGinnis, Tommy E.

    2015-12-04

    The VV and VVI will be used to establish trends, to make comparisons, and to evaluate restoration projects. Assessments that rely on the VVI will be included in appropriate Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) project reports and analyses. Implementation of the VVI will give coastal managers a new tool to design, implement, and monitor coastal restoration projects. A yearly trajectory of site, project, basin, and coastwide VVI will be posted on the CRMS Web site as data are collected. The primary purpose of the tool is to assess CWPPRA restoration project effectiveness, but it will also be useful in identifying areas in need of restoration and in coastwide vegetation assessments.

  6. 7 CFR 275.19 - Monitoring and evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM PERFORMANCE REPORTING SYSTEM Corrective Action § 275.19... Project Area/Management Unit Corrective Action Plan is implemented and achieves the anticipated results...

  7. Extended monitoring and analysis of moisture temperature data : research implementation plan.

    DOT National Transportation Integrated Search

    2006-12-07

    Variations in the mechanical properties of materials of a flexible pavement affect its response to applied : loads in the form of deflections, stresses and stains. The resilient modulus of asphalt concrete and of fine : grained subgrade soil vary sea...

  8. Water quality facility investigation report : final summary of project and evaluation of monitoring plan implementation.

    DOT National Transportation Integrated Search

    2005-07-05

    The Oregon Department of Transportation (ODOT) has installed several stormwater : treatment facilities throughout the State to improve the quality of runoff discharged from : highways. These facilities include a variety of both above ground and below...

  9. Strategic Environmental Assessment in Germany - Practice and open questions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiland, Ulrike, E-mail: uweiland@uni-leipzig.d

    2010-04-15

    Eight years after the enactment of the EU Strategic Environmental Assessment Directive (2001/42/EC) () it is time to investigate where and how SEA are being implemented in Germany in order to find out open questions and research needs. In this study, we analysed in which planning types SEA are common practice, and where can deficits be identified, and to what extent differences occur between spatial and sectoral planning with respect to carrying out SEA. Pressing challenges in performing SEA as well as open questions are addressed such as the handling of cumulative effects and the interrelationships between the environmental factors,more » and how the monitoring of environmental effects is considered by the practitioners. The results show that SEA is well implemented in local land-use planning, regional planning, and in local landscape planning, while the implementation in sectoral planning varies widely. The SEA in clean air planning is looked at in more detail, because this is discussed controversially in the specialist field, and obstacles against SEA are identified in this field. Finally some new topics are addressed for which solutions in spatial and environmental planning including SEA must be found, e.g. the consideration of biological diversity and the potential role of SEA in climate change. A European study on the identified open questions and their handling in different contexts and countries may allow for a qualitative amendment in practice.« less

  10. Plan for the control of Legionella infections in long-term care facilities: role of environmental monitoring.

    PubMed

    Cristino, Sandra; Legnani, Pier Paolo; Leoni, Erica

    2012-04-01

    In accordance with the international and national guidelines, the Emilia-Romagna Region (Italy) has established regional guidelines for the surveillance and prevention of legionellosis based on the concept of risk assessment, with particular attention to environmental monitoring. The aim of this study was to verify how environmental surveillance in the context of risk assessment plans could help to guide decisions about preventive strategies against Legionella infections in Long Term Care Facilities (LTCF). In six LTCFs in the city of Bologna (Emilia-Romagna Region) a self-control plan was implemented that included the environmental monitoring of Legionella spp. and the surveillance of hospital-acquired Legionnaires' Disease. At baseline, four hot water systems were colonized by Legionella pneumophila (3 LCTFs) and Legionella londiniensis (1 LCTF). In each establishment specific control measures were adopted based on the characteristics of the system, the virulence of the strain and the level of the contamination. The monitoring, carried out for around two years, was also extended to the ways in which the system and the distal water distribution points were used and maintained with respect to the good practices in operation and management. The adopted actions (shock and/or continuous disinfection treatments) and the implementation of the good practice measures reduced the contamination to acceptable and stable levels. No cases of hospital-acquired legionellosis occurred during the period of study. The environmental surveillance was successful in evaluating the risk and identifying the most suitable preventive strategies. Copyright © 2011 Elsevier GmbH. All rights reserved.

  11. Implications of Modeling Uncertainty for Water Quality Decision Making

    NASA Astrophysics Data System (ADS)

    Shabman, L.

    2002-05-01

    The report, National Academy of Sciences report, "Assessing the TMDL Approach to Water Quality Management" endorsed the "watershed" and "ambient water quality focused" approach" to water quality management called for in the TMDL program. The committee felt that available data and models were adequate to move such a program forward, if the EPA and all stakeholders better understood the nature of the scientific enterprise and its application to the TMDL program. Specifically, the report called for a greater acknowledgement of model prediction uncertinaity in making and implementing TMDL plans. To assure that such uncertinaity was addressed in water quality decision making the committee called for a commitment to "adaptive implementation" of water quality management plans. The committee found that the number and complexity of the interactions of multiple stressors, combined with model prediction uncertinaity means that we need to avoid the temptation to make assurances that specific actions will result in attainment of particular water quality standards. Until the work on solving a water quality problem begins, analysts and decision makers cannot be sure what the correct solutions are, or even what water quality goals a community should be seeking. In complex systems we need to act in order to learn; adaptive implementation is a concurrent process of action and learning. Learning requires (1) continued monitoring of the waterbody to determine how it responds to the actions taken and (2) carefully designed experiments in the watershed. If we do not design learning into what we attempt we are not doing adaptive implementation. Therefore, there needs to be an increased commitment to monitoring and experiments in watersheds that will lead to learning. This presentation will 1) explain the logic for adaptive implementation; 2) discuss the ways that water quality modelers could characterize and explain model uncertinaity to decision makers; 3) speculate on the implications of the adaptive implementation for setting of water quality standards, for design of watershed monitoring programs and for the regulatory rules governing the TMDL program implementation.

  12. Implementation of a best management practice (BMP) system for a clay mining facility in Taiwan.

    PubMed

    Lin, Jen-Yang; Chen, Yen-Chang; Chen, Walter; Lee, Tsu-Chuan; Yu, Shaw L

    2006-01-01

    The present paper describes the planning and implementation of a best management practice (BMP) system for a clay mining facility in Northern Taiwan. It is a challenge to plan and design BMPs for mitigating the impact of clay mining operations due to the fact that clay mining drainage typically contains very high concentrations of suspended solids (SS), Fe-ions, and [H+] concentrations. In the present study, a field monitoring effort was conducted to collect data for runoff quality and quantity from a clay mining area in Northern Taiwan. A BMP system including holding ponds connected in series was designed and implemented and its pollutant removal performance was assessed. The assessment was based on mass balance computations and an analysis of the relationship between BMP design parameters such as pond depth, detention time, surface loading rate, etc. and the pollutant removal efficiency. Field sampling results showed that the surface-loading rate is exponential related to the removing rate. The results provide the basis for a more comprehensive and efficient BMP implementation plan for clay mining operations.

  13. SU-F-P-04: Implementation of Dose Monitoring Software: Successes and Pitfalls

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Och, J

    2016-06-15

    Purpose: to successfully install a dose monitoring software (DMS) application to assist in CT protocol and dose management. Methods: Upon selecting the DMS, we began our implementation of the application. A working group composed of Medical Physics, Radiology Administration, Information Technology, and CT technologists was formed. On-site training in the application was supplied by the vendor. The decision was made to apply the process for all the CT protocols on all platforms at all facilities. Protocols were painstakingly mapped to the correct masters, and the system went ‘live’. Results: We are routinely using DMS as a tool in our Clinicalmore » Performance CT QA program. It is useful in determining the effectiveness of revisions to existing protocols, and establishing performance baselines for new units. However, the implementation was not without difficulty. We identified several pitfalls and obstacles which frustrated progress. Including: Training deficiencies, Nomenclature problems, Communication, DICOM variability. Conclusion: Dose monitoring software can be a potent tool for QA. However, implementation of the program can be problematic and requires planning, organization and commitment.« less

  14. Development of a theory- and evidence-based intervention to enhance implementation of physical therapy guidelines for the management of low back pain

    PubMed Central

    2014-01-01

    Background Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. Methods We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Results Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Conclusions Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process. PMID:24428945

  15. Development of a theory- and evidence-based intervention to enhance implementation of physical therapy guidelines for the management of low back pain.

    PubMed

    Rutten, Geert M; Harting, Janneke; Bartholomew, Leona K; Braspenning, Jozé C; van Dolder, Rob; Heijmans, Marcel Fgj; Hendriks, Erik Jm; Kremers, Stef Pj; van Peppen, Roland Ps; Rutten, Steven Tj; Schlief, Angelique; de Vries, Nanne K; Oostendorp, Rob Ab

    2014-01-15

    Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process.

  16. Critical role of developing national strategic plans as a guide to strengthen laboratory health systems in resource-poor settings.

    PubMed

    Nkengasong, John N; Mesele, Tsehaynesh; Orloff, Sherry; Kebede, Yenew; Fonjungo, Peter N; Timperi, Ralph; Birx, Deborah

    2009-06-01

    Medical laboratory services are an essential, yet often neglected, component of health systems in developing countries. Their central role in public health, disease control and surveillance, and patient management is often poorly recognized by governments and donors. However, medical laboratory services in developing countries can be strengthened by leveraging funding from other sources of HIV/AIDS prevention, care, surveillance, and treatment programs. Strengthening these services will require coordinated efforts by national governments and partners and can be achieved by establishing and implementing national laboratory strategic plans and policies that integrate laboratory systems to combat major infectious diseases. These plans should take into account policy, legal, and regulatory frameworks; the administrative and technical management structure of the laboratories; human resources and retention strategies; laboratory quality management systems; monitoring and evaluation systems; procurement and maintenance of equipment; and laboratory infrastructure enhancement. Several countries have developed or are in the process of developing their laboratory plans, and others, such as Ethiopia, have implemented and evaluated their plan.

  17. Bangladesh policy on prevention and control of non-communicable diseases: a policy analysis.

    PubMed

    Biswas, Tuhin; Pervin, Sonia; Tanim, Md Imtiaz Alam; Niessen, Louis; Islam, Anwar

    2017-06-19

    This paper is aimed at critically assessing the extent to which Non-Communicable Disease NCD-related policies introduced in Bangladesh align with the World Health Organization's (WHO) 2013-2020 Action Plan for the Global Strategy for the Prevention and Control of NCDs. The authors reviewed all relevant policy documents introduced by the Government of Bangladesh since its independence in 1971. The literature review targeted scientific and grey literature documents involving internet-based search, and expert consultation and snowballing to identify relevant policy documents. Information was extracted from the documents using a specific matrix, mapping each document against the six objectives of the WHO 2013-2020 Action Plan for the Global Strategy for the Prevention and Control of NCDs. A total of 51 documents were identified. Seven (14%) were research and/or surveys, nine were on established policies (17%), while seventeen (33%) were on action programmes. Five (10%) were related to guidelines and thirteen (25%) were strategic planning documents from government and non-government agencies/institutes. The study covered documents produced by the Government of Bangladesh as well as those by quasi-government and non-government organizations irrespective of the extent to which the intended policies were implemented. The policy analysis findings suggest that although the government has initiated many NCD-related policies or programs, they lacked proper planning, implementation and monitoring. Consequently, Bangladesh over the years had little success in effectively addressing the growing burden of non-communicable diseases. It is imperative that future research critically assess the effectiveness of national NCD policies by monitoring their implementation and level of population coverage.

  18. Coastwide Reference Monitoring System (CRMS)

    USGS Publications Warehouse

    2010-01-01

    In 1990, the U.S. Congress enacted the Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) in response to growing awareness of a land loss crisis in Louisiana. Projects funded by CWPPRA require monitoring and evaluation of project effectiveness, and there is also a need to assess the cumulative effects of all projects to achieve a sustainable coastal environment. In 2003, the Louisiana Office of Coastal Protection and Restoration (OCPR) and the U.S. Geological Survey (USGS) received approval from the CWPPRA Task Force to implement the Coastwide Reference Monitoring System (CRMS) as a mechanism to monitor and evaluate the effectiveness of CWPPRA projects at the project, region, and coastwide levels. The CRMS design implements a multiple reference approach by using aspects of hydrogeomorphic functional assessments and probabilistic sampling. The CRMS program is as dynamic as the coastal habitats it monitors. The program is currently funded through CWPPRA and provides data for a variety of user groups, including resource managers, academics, landowners, and researchers.

  19. Birds in Hawai'i Volcanoes National Park: Summary of the 2010 inventory and monitoring program survey

    USGS Publications Warehouse

    Camp, Richard J.; Judge, Seth W.; Hart, Patrick J.; Kudray, Greg; Gaudioso, Jacqueline M.; Hsu, Bobby H.

    2012-01-01

    The National Park Service (NPS) created the Inventory and Monitoring (I&M) Program in 1998 to establish baseline information and assess long-term trends in "vital signs" or key abiotic and biotic elements of National Parks (Fancy et al. 2009). The Pacific Island Network of the I&M Program developed a Landbirds Monitoring Protocol (LMP; Camp et al. 2011) to estimate species-specific status and monitor longterm trends in landbird distribution and abundance. Parks included in the LMP that harbor habitat critically important to native forest birds are Haleakala National Park (Maui Island), Hawai'i Volcanoes National Park (HAVO; Hawai'i Island), and the National Park of American Samoa (American Samoa). In 2010, the LMP was implemented in HAVO to survey landbird density and abundance. This implementation was the first anywhere in the Pacific Islands by the I&M Program, and continued monitoring is planned every five years in all three parks.

  20. Albeni Falls Wildlife Mitigation : Annual Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terra-Berns, Mary

    The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less

  1. Automated Monitoring of Pipeline Rights-of-Way

    NASA Technical Reports Server (NTRS)

    Frost, Chard Ritchie

    2010-01-01

    NASA Ames Research Center and the Pipeline Research Council International, Inc. have partnered in the formation of a research program to identify and develop the key technologies required to enable automated detection of threats to gas and oil transmission and distribution pipelines. This presentation describes the Right-of-way Automated Monitoring (RAM) program and highlights research successes to date, continuing challenges to implementing the RAM objectives, and the program's ongoing work and plans.

  2. 40 CFR 469.18 - Pretreatment standards for new sources (PSNS).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (PSNS). 469.18 Section 469.18 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS ELECTRICAL AND ELECTRONIC COMPONENTS POINT SOURCE CATEGORY Semiconductor... monitoring pursuant to § 469.13 (c) and (d) of this regulation must implement the solvent management plan...

  3. 49 CFR 192.631 - Control room management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to exceed 15 months; and (5) Establish and implement procedures for when a different controller..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...

  4. Monitoring and analysis of data obtained from moisture temperature recording stations : research implementation plan.

    DOT National Transportation Integrated Search

    2001-09-01

    Variations in the mechanical properties of materials of a flexible pavement affect its response to applied : loads in the form of deflections, stresses and stains. The resilient modulus of asphalt concrete and of fine : grained subgrade soil vary sea...

  5. SEA effectiveness for landscape and master planning: An investigation in Sardinia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    De Montis, Andrea, E-mail: andreadm@uniss.it; Ledda, Antonio, E-mail: antonioledda@gmail.com; Caschili, Simone, E-mail: s.caschili@ucl.ac.uk

    The Italian administrative bodies and planning agencies have embraced with mixed feedbacks the introduction of Strategic Environmental Assessment (SEA) through the European Directive 2001/42/EC. Concurrently, regional and local spatial planning practice have been characterized by a new approach inspired by landscape planning. The Italian region of Sardinia has been one of the pioneering administrative bodies in the Italian and European arena that has adopted landscape principles for the construction of its regional master plan (PPR, Piano Paesaggistico Regionale). Municipalities are now carrying out the review of their master plans to the PPR's prescriptions and indications. Against this background, the aimmore » of this paper is to assess the level of SEA implementation in the municipal master plans of Sardinia, six years after the approval of the PPR. Rooted in the SEA international literature we construct a modular and adaptable on-line survey for officers involved in the review of municipal master plans. The results show that many Sardinian municipalities have not reviewed their master plans to the PPR's regulations yet and only a few municipalities have started this review process according to the SEA procedure. - Highlights: • We study strategic environmental assessment (SEA) effectiveness on land use plans • Four SEA implementation key issues are drawn from international literature • Data collection has included an on-line survey with close and open questions • Results indicate that SEA has been poorly implemented in landscape and master plans • Weak aspects include planning alternatives, financial resources, and monitoring.« less

  6. Program on State Agency Remote Sensing Data Management (SARSDM). [missouri

    NASA Technical Reports Server (NTRS)

    Eastwood, L. F., Jr.; Gotway, E. O.

    1978-01-01

    A planning study for developing a Missouri natural resources information system (NRIS) that combines satellite-derived data and other information to assist in carrying out key state tasks was conducted. Four focal applications -- dam safety, ground water supply monitoring, municipal water supply monitoring, and Missouri River basin modeling were identified. Major contributions of the study are: (1) a systematic choice and analysis of a high priority application (water resources) for a Missouri, LANDSAT-based information system; (2) a system design and implementation plan, based on Missouri, but useful for many other states; (3) an analysis of system costs, component and personnel requirements, and scheduling; and (4) an assessment of deterrents to successful technological innovation of this type in state government, and a system management plan, based on this assessment, for overcoming these obstacles in Missouri.

  7. Subsidence monitoring network: an Italian example aimed at a sustainable hydrocarbon E&P activity

    NASA Astrophysics Data System (ADS)

    Dacome, M. C.; Miandro, R.; Vettorel, M.; Roncari, G.

    2015-11-01

    According to the Italian law in order to start-up any new hydrocarbon exploitation activity, an Environmental Impact Assessment study has to be presented, including a monitoring plan, addressed to foresee, measure and analyze in real time any possible impact of the project on the coastal areas and on those ones in the close inland located. The occurrence of subsidence, that could partly be related to hydrocarbon production, both on-shore and off-shore, can generate great concern in those areas where its occurrence may have impacts on the local environment. ENI, following the international scientific community recommendations on the matter, since the beginning of 90's years, implemented a cutting-edge monitoring network, with the aim to prevent, mitigate and control geodynamics phenomena generated in the activity areas, with a particular attention to conservation and protection of environmental and territorial equilibrium, taking care of what is known as "sustainable development". The current ENI implemented monitoring surveys can be divided as: - Shallow monitoring: spirit levelling surveys, continuous GPS surveys in permanent stations, SAR surveys, assestimeter subsurface compaction monitoring, ground water level monitoring, LiDAR surveys, bathymetrical surveys. - Deep monitoring: reservoir deep compaction trough radioactive markers, reservoir static (bottom hole) pressure monitoring. All the information, gathered through the monitoring network, allow: 1. to verify if the produced subsidence is evolving accordingly with the simulated forecast. 2. to provide data to revise and adjust the prediction compaction models 3. to put in place the remedial actions if the impact exceeds the threshold magnitude originally agreed among the involved parties. ENI monitoring plan to measure and monitor the subsidence process, during field production and also after the field closure, is therefore intended to support a sustainable field development and an acceptable exploitation programme in which the actual risk connected with the field production is evaluated in advance, shared and agreed among all the involved subjects: oil company, stakeholders and local community (with interests in the affected area).

  8. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  9. Implementation Science Supports Core Clinical Competencies: An Overview and Clinical Example.

    PubMed

    Kirchner, JoAnn E; Woodward, Eva N; Smith, Jeffrey L; Curran, Geoffrey M; Kilbourne, Amy M; Owen, Richard R; Bauer, Mark S

    2016-12-08

    Instead of asking clinicians to work faster or longer to improve quality of care, implementation science provides another option. Implementation science is an emerging interdisciplinary field dedicated to studying how evidence-based practice can be adopted into routine clinical care. This article summarizes principles and methods of implementation science, illustrates how they can be applied in a routine clinical setting, and highlights their importance to practicing clinicians as well as clinical trainees. A hypothetical clinical case scenario is presented that explains how implementation science improves clinical practice. The case scenario is also embedded within a real-world implementation study to improve metabolic monitoring for individuals prescribed antipsychotics. Context, recipient, and innovation (ie, the evidence-based practice) factors affected improvement of metabolic monitoring. To address these factors, an external facilitator and a local quality improvement team developed an implementation plan involving a multicomponent implementation strategy that included education, performance reports, and clinician follow-up. The clinic remained compliant with recommended metabolic monitoring at 1-year follow up. Implementation science improves clinical practice by addressing context, recipient, and innovation factors and uses this information to develop and utilize specific strategies that improve clinical practice. It also enriches clinical training, aligning with core competencies by the Accreditation Council for Graduate Medical Education and American Boards of Medical Specialties. By learning how to change clinical practice through implementation strategies, clinicians are more able to adapt in complex systems of practice. © Copyright 2016 Physicians Postgraduate Press, Inc.

  10. Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.

    PubMed

    Day, Roger S

    2010-02-01

    In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.

  11. Monitoring plan for vegetation responses to elk management in Rocky Mountain National Park

    USGS Publications Warehouse

    Zeigenfuss, Linda C.; Johnson, Therese L.; Wiebe, Zachary

    2011-01-01

    Rocky Mountain National Park (RMNP) in north-central Colorado supports numerous species of wildlife, including several large ungulate species among which Rocky Mountain elk (Cervus elaphus) are the most abundant. Elk are native to RMNP but were extirpated from the area by the late 1800s. They were reintroduced to the area in 1913-1914, and the elk herd grew to the point that it was actively managed from 1944 until 1968. In 1969, the active control of elk was discontinued and since then the herd has increased to a high point ranging from 2,800 to 3,500 between 1997 and 2001. In recent years, there has been growing concern over the condition of vegetation in the park and conflicts between elk and humans, both inside and outside the park. In response to these concerns, RMNP implemented an Elk and Vegetation Management Plan (EVMP) in 2009 to guide management actions in the park over a 20-year time period with the goal of reducing the impacts of elk on vegetation and restoring the natural range of variability in the elk population and affected plant and animal communities. The EVMP outlines the desired future condition for three vegetation communities where the majority of elk herbivory impacts are being observed: aspen, montane riparian willow, and upland herbaceous communities. The EVMP incorporates the principle of adaptive management whereby the effectiveness of management actions is assessed and adjusted as needed to successfully achieve objectives. Determination of whether vegetation objectives are being achieved requires monitoring and evaluation of target vegetation communities. The current report describes the design and implementation of a vegetation-monitoring program to help RMNP managers assess the effectiveness of their management actions and determine when and where to alter actions to achieve the EVMP's vegetation objectives. This monitoring plan details the process of selecting variables to be monitored, overall sampling design and structure, site selection, data collection methods, and statistical analyses to be used to conduct this monitoring program in conjunction with the EVMP. We report the baseline conditions observed at the time of the establishment of monitoring sites. We include detailed field protocols for site establishment and data collection, as well as timetables for sampling, so that RMNP staff will be able to continue monitoring the sites established during this implementation stage, and continue to add new sites when necessary, as the execution of the EVMP proceeds over the next 20 years.

  12. Defense Nuclear Enterprise: DOD Has Established Processes for Implementing and Tracking Recommendations to Improve Leadership, Morale, and Operations

    DTIC Science & Technology

    2016-07-14

    and (2) track the implementation of these recommendations and measure the effectiveness of the actions it has taken to address them. We briefed the... effectiveness of actions taken, we reviewed key documents, including the reports of the nuclear enterprise reviews, Strategic Command’s action plan, DOD...Federal Government—including assessing and responding to risk, using and effectively communicating quality information, and performing monitoring

  13. Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC for the Environmental Compliance Department ES&H Division, Y-12 National Security Complex Oak Ridge, Tennessee

    2003-09-30

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2004 will be in accordance with the following requirements of DOE Order 5400.1: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are mostmore » likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2004 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2004 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells, or wells could be added or removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less

  14. Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2004-09-30

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2005 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to maintain surveillance of existing and potential groundwater contamination sources; (2) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; (3) to identify and characterize long-term trends in groundwater quality at Y-12; and (4) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2005 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2005 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan.« less

  15. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less

  16. Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chapman, Jenny; Lyles, Brad; Cooper, Clay

    Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less

  17. Creating a future worth experiencing: nursing strategic planning in an integrated healthcare delivery system.

    PubMed

    Drenkard, K N

    2001-01-01

    The application of a strategic planning methodology for the discipline of nursing is described in use by a large, nonprofit integrated healthcare system. The methodology uses a transformational leadership assessment tool, quality planning methods, and large group intervention to engage nurses in the implementation of strategies. Based on systems theory, the methodology outlined by the author has application at any level in an organization, from an entire delivery network, to a patient care unit. The author discusses getting started on a strategic planning journey, tools that are useful in the process, integrating already existing business plans into the strategies for nursing, preliminary measures to monitor progress, and lessons learned along the journey.

  18. Evaluation and prioritization of stream habitat monitoring in the Lower Columbia Salmon and Steelhead Recovery Domain as related to the habitat monitoring needs of ESA recovery plans

    USGS Publications Warehouse

    Puls, Amy L.; Anlauf Dunn, Kara; Graham Hudson, Bernadette

    2014-01-01

    The lower Columbia River and its tributaries once supported abundant runs of salmon and steelhead; however, there are five species currently listed under the federal Endangered Species Act (ESA). The National Marine Fisheries Service has completed, and is proposing for adoption, a comprehensive ESA Recovery Plan for the Lower Columbia Evolutionarily Significant Units (ESUs) based on the recovery plans developed by Oregon and Washington. One of the primary factors attributed to the decline of these species is habitat degradation. There are numerous entities conducting status and/or trends monitoring of instream habitat in the lower Columbia River Basin, but because the programs were developed for agency specific reasons, the existing monitoring efforts are not well coordinated, and often lack the spatial coverage, certainty, or species coverage necessary to answer questions related to status and trends of the ESA listed populations. The Pacific Northwest Aquatic Monitoring Partnership’s Integrated Status and Trends Monitoring (ISTM) project was initiated to improve integration of existing and new monitoring efforts by developing recommendations for sampling frames, protocols, and data sharing. In an effort to meet the ISTM project goals, five objectives were identified: (1) identify and prioritize decisions, questions, and monitoring objectives, (2) evaluate how existing programs align with these management decisions, questions, and objectives, (3) identify the most appropriate monitoring design to inform priority management decisions, questions, and objectives, (4) use trade-off analysis to develop specific recommendations for monitoring based on outcomes of Objectives 1-3 and (5) recommend implementation and reporting mechanisms. This report summarizes the effort to address Objectives 1 and 2, detailing the commonalities among the habitat characteristics that all entities measure and monitor, and how the metrics align with the priorities listed in the comprehensive recovery plan for the Lower Columbia ESUs.

  19. 75 FR 16026 - Approval and Promulgation of State Implementation Plan Revisions; State of North Dakota; Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... values for two monitors in Missoula County were 11.1, 11.4 and 11.8 [mu]g/m\\3\\. Computed from AQS... domain * * *''). \\16\\ The 400 mile distance to the nonattainment area is calculated from St. Cloud, and...

  20. 49 CFR 192.631 - Control room management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...

  1. 49 CFR 192.631 - Control room management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...

  2. 49 CFR 192.631 - Control room management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...

  3. 49 CFR 192.631 - Control room management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... at intervals not to exceed 15 months; and (5) Establish and implement procedures for when a different..., but at intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the...) (regarding fatigue), (i) (regarding compliance validation), and (j) (regarding compliance and deviations) of...

  4. 77 FR 3928 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Consumer and Commercial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-26

    ... containers, consumer products, architectural and industrial (AIM) coatings, adhesives and sealants, and... commercial products; (3) adds special provisions in Chapter 45 that specify monitoring, compliance... fuel containers for products manufactured before and after August 1, 2010; (5) establishes standards...

  5. Hood River and Pelton Ladder Evaluation Studies : Annual Report 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olsen, Erik A.; French, Rod A.; Ritchey, Alan D.

    1995-09-01

    In 1992, the Northwest Power Planning Council approved the Hood River and Pelton ladder master plans within the framework of the Columbia River Basin Fish and Wildlife Program. The master plans define an approach for implementing a hatchery supplementation program in the Hood River subbasin. The hatchery program as defined in the master plans is called the Hood River Hatchery Production Program (HRPP). The HRPP will be phased in over several years and will be jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Warm Springs (CTWS) Reservation. In December 1991, amore » monitoring and evaluation program was implemented in the Hood River subbasin to collect life history and production information on stocks of anadromous salmonids returning to the Hood River subbasin. The program was implemented to provide the baseline information needed to: (1) evaluate various management options for implementing the HRPP and (2) determine any post-project impacts the HRPP has on indigenous populations of resident fish. Information collected during the 1992-94 fiscal years will also be used to prepare an environmental impact statement (EIS) evaluating the program`s impact on the human environment. To begin construction on project facilities, it was proposed that the HRPP be implemented in two phases. Phase I would include work that would fall under a {open_quotes}categorical exclusion{close_quotes} from NEPA, and Phase II would include work requiring an EIS prior to implementation. This report summarizes the life history and escapement data collected in the Hood River subbasin and the status work of implemented under Phase I of the HR Life history and escapement data will be used to: (1) test the assumptions on which harvest and escapement goals for the Hood River and Pelton ladder master plans are based and (2) develop biologically based management recommendations for implementing the HRPP.« less

  6. CWA 15793 2011 Planning and Implementation Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gross, Alan; Nail, George

    This software, built on an open source platform called Electron (runs on Chromium and Node.js), is designed to assist organizations in the implementation of a biorisk management system consistent with the requirements of the international, publicly available guidance document CEN Workshop Agreement 15793:2011 (CWA 15793). The software includes tools for conducting organizational gap analysis against CWA 15793 requirements, planning tools to support the implementation of CWA 15793 requirements, and performance monitoring support. The gap analysis questions are based on the text of CWA 15793, and its associated guidance document, CEN Workshop Agreement 16393:2012. The authors have secured permission from themore » publisher of CWA 15793, the European Committee for Standardization (CEN), to use language from the document in the software, with the understanding that the software will be made available freely, without charge.« less

  7. Recovering from execution errors in SIPE

    NASA Technical Reports Server (NTRS)

    Wilkins, D. E.

    1987-01-01

    In real-world domains (e.g., a mobile robot environment), things do not always proceed as planned, so it is important to develop better execution-monitoring techniques and replanning capabilities. These capabilities in the SIPE planning system are described. The motivation behind SIPE is to place enough limitations on the representation so that planning can be done efficiently, while retaining sufficient power to still be useful. This work assumes that new information given to the execution monitor is in the form of predicates, thus avoiding the difficult problem of how to generate these predicates from information provided by sensors. The replanning module presented here takes advantage of the rich structure of SIPE plans and is intimately connected with the planner, which can be called as a subroutine. This allows the use of SIPE's capabilities to determine efficiently how unexpected events affect the plan being executed and, in many cases, to retain most of the original plan by making changes in it to avoid problems caused by these unexpected events. SIPE is also capable of shortening the original plan when serendipitous events occur. A general set of replanning actions is presented along with a general replanning capability that has been implemented by using these actions.

  8. Principles of effective USA federal fire management plans

    USGS Publications Warehouse

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  9. Current Status and Future Plan of Arctic Sea Ice monitoring in South Korea

    NASA Astrophysics Data System (ADS)

    Shin, J.; Park, J.

    2016-12-01

    Arctic sea ice is one of the most important parameters in climate. For monitoring of sea ice changes, the National Meteorological Satellite Center (NMSC) of Korea Metrological Administration has developed the "Arctic sea ice monitoring system" to retrieve the sea ice extent and surface roughness using microwave sensor data, and statistical prediction model for Arctic sea ice extent. This system has been implemented to the web site for real-time public service. The sea ice information can be retrieved using the spaceborne microwave sensor-Special Sensor Microwave Imager/Sounder (SSMI/S). The sea ice information like sea ice extent, sea ice surface roughness, and predictive sea ice extent are produced weekly base since 2007. We also publish the "Analysis report of the Arctic sea ice" twice a year. We are trying to add more sea ice information into this system. Details of current status and future plan of Arctic sea ice monitoring and the methodology of the sea ice information retrievals will be presented in the meeting.

  10. Policy Coherence and Interplay between Climate Change Adaptation Policies and the Forestry Sector in Nepal.

    PubMed

    Ranabhat, Sunita; Ghate, Rucha; Bhatta, Laxmi Dutt; Agrawal, Nand Kishor; Tankha, Sunil

    2018-06-01

    Least Developed Countries are likely to be hit the hardest by climate change and need focused efforts towards adaptation. Nepal recognizes that it needs to integrate climate change adaptation into various policies, but limited understanding of how to make these policies coherent is among the factors that hinder effective adaptation action. This can lead to wasted resources and lost opportunities. This paper applies concepts from policy coherence for development frameworks and policy content analysis to examine coherence in Nepal's climate and forest policies-and discusses the factors hindering effective implementation. The policies are analyzed at the horizontal/external level at three layers-motivation, measures, and planned implementation process. The paper finds that policies are more consistent on motivation level and adaptation measures, but are less coherent on implementation. The National Adaptation Programme of Action (NAPA) is more explicit in identifying institutions, organizations, roles and responsibilities, resource allocation (financial), and a monitoring and evaluation plan for climate change adaptation while other policies such as Climate Change Policy 2011, National Biodiversity Strategy and Action Plan 2014-2020, Forest Policy 2015, and Forest Sector Strategy 2016 have critical gaps in this area. This paper conclude that formulation of a policy, articulating targets, and mobilizing financial resources are in themselves not sufficient to effectively address climate change adaptation. Policy-based legislation is required, together with development of a supportive collaborative multi-stakeholder approach at different levels of governance, backed up by effective, collaborative monitoring and enforcement.

  11. Policy Coherence and Interplay between Climate Change Adaptation Policies and the Forestry Sector in Nepal

    NASA Astrophysics Data System (ADS)

    Ranabhat, Sunita; Ghate, Rucha; Bhatta, Laxmi Dutt; Agrawal, Nand Kishor; Tankha, Sunil

    2018-06-01

    Least Developed Countries are likely to be hit the hardest by climate change and need focused efforts towards adaptation. Nepal recognizes that it needs to integrate climate change adaptation into various policies, but limited understanding of how to make these policies coherent is among the factors that hinder effective adaptation action. This can lead to wasted resources and lost opportunities. This paper applies concepts from policy coherence for development frameworks and policy content analysis to examine coherence in Nepal's climate and forest policies—and discusses the factors hindering effective implementation. The policies are analyzed at the horizontal/external level at three layers—motivation, measures, and planned implementation process. The paper finds that policies are more consistent on motivation level and adaptation measures, but are less coherent on implementation. The National Adaptation Programme of Action (NAPA) is more explicit in identifying institutions, organizations, roles and responsibilities, resource allocation (financial), and a monitoring and evaluation plan for climate change adaptation while other policies such as Climate Change Policy 2011, National Biodiversity Strategy and Action Plan 2014-2020, Forest Policy 2015, and Forest Sector Strategy 2016 have critical gaps in this area. This paper conclude that formulation of a policy, articulating targets, and mobilizing financial resources are in themselves not sufficient to effectively address climate change adaptation. Policy-based legislation is required, together with development of a supportive collaborative multi-stakeholder approach at different levels of governance, backed up by effective, collaborative monitoring and enforcement.

  12. EXPOSURE ASSESSMENT IMPLICATIONS FOR THE DESIGN AND IMPLEMENTATION OF THE NATIONAL CHILDREN'S STUDY

    EPA Science Inventory

    Examining the influence of environmental exposures on various health indices is a critical component of the planned National Children¿s Study (NCS). An ideal strategy for the exposure monitoring component of the NCS is to measure indoor and outdoor concentrations and personal exp...

  13. Implementing Outcomes Based Accountability in Children's Services. Case Studies

    ERIC Educational Resources Information Center

    Bergeron, Caroline; Chamberlain, Tamsin; George, Nalia; Golden, Sarah; Mundy, Ellie; Southcott, Clare; Walker, Fiona

    2010-01-01

    Outcomes Based Accountability (OBA) is an approach that Children's Trusts and Children's Services can use to assist with planning services and assessing their performance. The OBA approach focuses on outcomes that are desired and monitoring and evidencing progress towards those desired outcomes. OBA makes a distinction between two types of…

  14. 76 FR 42549 - Approval and Promulgation of Air Quality Implementation Plans; Louisiana; Section 110(a)(2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ..., including emissions inventories, monitoring, and modeling to assure attainment and maintenance of the... of the Louisiana Environmental Action Network (LEAN, hereinafter referred to as ``the commenter... action'' subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR...

  15. 77 FR 64425 - Approval and Promulgation of Implementation Plans; Alaska: Infrastructure Requirements for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... Ambient Air Quality Standard AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY... the National Ambient Air Quality Standards (NAAQS) promulgated for ozone on July 18, 1997. EPA finds... measuring and monitoring ozone in ambient air, a general definition of ozone, federal Prevention of...

  16. 76 FR 77952 - Approval and Promulgation of Implementation Plans; North Carolina; 110(a)(1) and (2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ..., including emissions inventories, monitoring, and modeling to assure attainment and maintenance of the NAAQS.... As mentioned above, these requirements include SIP infrastructure elements such as modeling... officials; public notification; and PSD and visibility protection. 110(a)(2)(K): Air quality modeling/data...

  17. Energy poverty: Electrification and well-being

    NASA Astrophysics Data System (ADS)

    Rahul Sharma, Karnamadakala; Chan, Gabriel

    2016-11-01

    Energy access entails a range of metrics that need to be monitored to guide planning and implementation of electricity provision in developing nations. A study based on an extensive household survey carried out in rural India demonstrates that electricity supply duration is the best predictor for satisfaction with electricity service.

  18. Effluent Monitoring Procedures: Nutrients. Staff Guide.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This is one of several short-term courses developed to assist in the training of waste water treatment plant operational personnel in the tests, measurements, and report preparation required for compliance with their NPDES Permits. This Staff Guide provides step-by-step guidelines on course planning, development and implementation involving…

  19. Current Issues in English Language Teacher-Based Assessment

    ERIC Educational Resources Information Center

    Davison, Chris; Leung, Constant

    2009-01-01

    Teacher-based assessment (TBA) is increasingly being promoted in educational policies internationally, with English language teachers being called on to plan and/or implement appropriate assessment procedures to monitor and evaluate student progress in their own classrooms. However, there has been a lack of theorization of TBA in the English…

  20. Effluent Monitoring Procedures: Metals Analyses. Staff Guide.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This is one of several short-term courses developed to assist in the training of waste water treatment plant operational personnel in the tests, measurements, and report preparation required for compliance with their NPDES Permits. The Staff Guide provides step-by-step information on course planning, development, and implementation involving…

  1. 78 FR 62523 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ..., regulatory structure, monitoring, modeling, legal authority, and adequate resources necessary to assure... the Agency views these as noncontroversial submittals and anticipates no adverse comments. A more... subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any...

  2. Interactive Radio Counseling in Indira Gandhi National Open University: A Study.

    ERIC Educational Resources Information Center

    Chaudhary, Sohanvir S.; Bansal, Kiron

    2000-01-01

    Explains interactive radio as an effective tool for open and distance learning provided it is planned, designed, implemented, and monitored systematically. Describes the interactive radio counseling at Indira Gandhi National Open University (IGNOU) that provides support to students who study print material and may attend weekend…

  3. 77 FR 11928 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Regional Haze

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... monitoring, modeling, and scientific knowledge about the relationships between pollutants and visibility... for their BART modeling under the BART Guidelines, below which a BART-eligible source may be... conduct modeling to assess the impact of each of these identified candidate sources. This modeling...

  4. 3 CFR 13626 - Executive Order 13626 of September 10, 2012. Gulf Coast Ecosystem Restoration

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... information relevant to Gulf Coast restoration, including through research, modeling, and monitoring; and..., planning, and the exchange of information in order to better implement Gulf Coast ecosystem restoration and... Ecosystem Restoration Council (Gulf Restoration Council), which will build upon the Task Force's already...

  5. Implementation of School Policies to Prevent Youth Tobacco Use in Alabama

    ERIC Educational Resources Information Center

    Geiger, Brian F.; Vaid, Isam; Beeson, Diane; Riddle, Barry

    2012-01-01

    Background: Public health professionals must monitor the effectiveness of school policies and programs to prevent youth initiation, promote quitting, and eliminate secondhand smoke. This analysis of school tobacco policies was preliminary to release of a state tobacco prevention and control plan for 2010-2015. Methods: University health educators…

  6. Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry

    2003-06-09

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less

  7. Superfund record of decision (EPA Region 4): USMC Camp Lejeune Military Reservation, operable unit 4, Jacksonville, NC, January 16, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-05-01

    This operable unit consists of Sites 41 and 74. The remedial actions are designed to prevent future potential exposure by implementing institutional controls. These controls include: (1) designate the sites as `restricted` or `limited use` areas, within the base master plan; (2) prohibit the installation of potable water supply wells within the vicinity of the sites: and (3) implement a groundwater, surface water and sediment monitoring program.

  8. Safe Surgery for All: Early Lessons from Implementing a National Government-Driven Surgical Plan in Ethiopia.

    PubMed

    Burssa, Daniel; Teshome, Atlibachew; Iverson, Katherine; Ahearn, Olivia; Ashengo, Tigistu; Barash, David; Barringer, Erin; Citron, Isabelle; Garringer, Kaya; McKitrick, Victoria; Meara, John; Mengistu, Abraham; Mukhopadhyay, Swagoto; Reynolds, Cheri; Shrime, Mark; Varghese, Asha; Esseye, Samson; Bekele, Abebe

    2017-12-01

    Recognizing the unmet need for surgical care in Ethiopia, the Federal Ministry of Health (FMOH) has pioneered innovative methodologies for surgical system development with Saving Lives through Safe Surgery (SaLTS). SaLTS is a national flagship initiative designed to improve access to safe, essential and emergency surgical and anaesthesia care across all levels of the healthcare system. Sustained commitment from the FMOH and their recruitment of implementing partners has led to notable accomplishments across the breadth of the surgical system, including but not limited to: (1) Leadership, management and governance-a nationally scaled surgical leadership and mentorship programme, (2) Infrastructure-operating room construction and oxygen delivery plan, (3) Supplies and logistics-a national essential surgical procedure and equipment list, (4) Human resource development-a Surgical Workforce Expansion Plan and Anaesthesia National Roadmap, (5) Advocacy and partnership-strong FMOH partnership with international organizations, including GE Foundation's SafeSurgery2020 initiative, (6) Innovation-facility-driven identification of problems and solutions, (7) Quality of surgical and anaesthesia care service delivery-a national peri-operative guideline and WHO Surgical Safety Checklist implementation, and (8) Monitoring and evaluation-a comprehensive plan for short-term and long-term assessment of surgical quality and capacity. As Ethiopia progresses with its commitment to prioritize surgery within its Health Sector Transformation Plan, disseminating the process and outcomes of the SaLTS initiative will inform other countries on successful national implementation strategies. The following article describes the process by which the Ethiopian FMOH established surgical system reform and the preliminary results of implementation across these eight pillars.

  9. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie,more » bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.« less

  10. Practical implementation science: developing and piloting the quality implementation tool.

    PubMed

    Meyers, Duncan C; Katz, Jason; Chien, Victoria; Wandersman, Abraham; Scaccia, Jonathan P; Wright, Annie

    2012-12-01

    According to the Interactive Systems Framework for Dissemination and Implementation, implementation is a major mechanism and concern in bridging research and practice. The growing number of implementation frameworks need to be synthesized and translated so that the science and practice of quality implementation can be furthered. In this article, we: (1) use the synthesis of frameworks developed by Meyers et al. (Am J Commun Psychol, 2012) and translate the results into a practical implementation science tool to use for improving quality of implementation (i.e., the Quality Implementation Tool; QIT), and (2) present some of the benefits and limitations of the tool by describing how the QIT was implemented in two different pilot projects. We discuss how the QIT can be used to guide collaborative planning, monitoring, and evaluation of how an innovation is implemented.

  11. Tobacco Surcharges on 2015 Health Insurance Plans Sold in Federally Facilitated Marketplaces: Variations by Age and Geography and Implications for Health Equity.

    PubMed

    Liber, Alex C; Drope, Jeffrey M; Graetz, Ilana; Waters, Teresa M; Kaplan, Cameron M

    2015-11-01

    In 2014, few health insurance plans sold in the Affordable Care Act's Federally Facilitated Marketplaces had age-dependent tobacco surcharges, possibly because of a system glitch. The 2015 tobacco surcharges show wide variation, with more plans implementing tobacco surcharges that increase with age. This underscores concerns that older tobacco users will find postsubsidy health insurance premiums difficult to afford. Future monitoring of enrollment will determine whether tobacco surcharges cause adverse selection by dissuading tobacco users, particularly older users, from buying health insurance.

  12. Integrating Social Media Monitoring Into Public Health Emergency Response Operations.

    PubMed

    Hadi, Tamer A; Fleshler, Keren

    2016-10-01

    Social media monitoring for public health emergency response and recovery is an essential response capability for any health department. The value of social media for emergency response lies not only in the capacity to rapidly communicate official and critical incident information, but as a rich source of incoming data that can be gathered to inform leadership decision-making. Social media monitoring is a function that can be formally integrated into the Incident Command System of any response agency. The approach to planning and required resources, such as staffing, logistics, and technology, is flexible and adaptable based on the needs of the agency and size and scope of the emergency. The New York City Department of Health and Mental Hygiene has successfully used its Social Media Monitoring Team during public health emergency responses and planned events including major Ebola and Legionnaires' disease responses. The concepts and implementations described can be applied by any agency, large or small, interested in building a social media monitoring capacity. (Disaster Med Public Health Preparedness. 2016;page 1 of 6).

  13. Thick-film acoustic emission sensors for use in structurally integrated condition-monitoring applications.

    PubMed

    Pickwell, Andrew J; Dorey, Robert A; Mba, David

    2011-09-01

    Monitoring the condition of complex engineering structures is an important aspect of modern engineering, eliminating unnecessary work and enabling planned maintenance, preventing failure. Acoustic emissions (AE) testing is one method of implementing continuous nondestructive structural health monitoring. A novel thick-film (17.6 μm) AE sensor is presented. Lead zirconate titanate thick films were fabricated using a powder/sol composite ink deposition technique and mechanically patterned to form a discrete thick-film piezoelectric AE sensor. The thick-film sensor was benchmarked against a commercial AE device and was found to exhibit comparable responses to simulated acoustic emissions.

  14. NRC Waste Incidental to Reprocessing Program: Overview of Consultation and Monitoring Activities at the Idaho National Laboratory and the Savannah River Site - What We Have Learned - 12470

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Suber, Gregory

    2012-07-01

    In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed onmore » tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)« less

  15. Operational considerations for implementing regional sediment management plans in the northern Gulf of Mexico

    USGS Publications Warehouse

    Underwood, Steven G.; Khalil, Syed M.; Byrnes, Mark R.; Steyer, Gregory D.; Raynie, Richard C

    2015-01-01

    Development of a comprehensive and stakeholder-driven Regional Sediment Management plan can provide the basis for long-term sustainable resource use and protection. This paper highlights three operational components that can positively influence sediment management at a regional scale, including (1) integration of an operational sediment budget, (2) development of a monitoring and adaptive management plan, and (3) development of a regional sediment availability and allocation program. These components seek to incorporate science and adaptive management through implementation of an organized and well-documented decision making process. They represent a coordinated framework that could serve as a guide for unifying financial investments in regional sediment management plans. Collectively, they establish an integrated process for addressing uncertainties about future system change in light of shrinking federal and state budgets, competing demands for sediment resources within riverine and marine waters, and policy considerations related to sediment/water use (e.g., navigation and commerce versus environmental management).

  16. [Implementation of a safety and health planning system in a teaching hospital].

    PubMed

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  17. Incorporating geodiversity into conservation decisions.

    PubMed

    Comer, Patrick J; Pressey, Robert L; Hunter, Malcolm L; Schloss, Carrie A; Buttrick, Steven C; Heller, Nicole E; Tirpak, John M; Faith, Daniel P; Cross, Molly S; Shaffer, Mark L

    2015-06-01

    In a rapidly changing climate, conservation practitioners could better use geodiversity in a broad range of conservation decisions. We explored selected avenues through which this integration might improve decision making and organized them within the adaptive management cycle of assessment, planning, implementation, and monitoring. Geodiversity is seldom referenced in predominant environmental law and policy. With most natural resource agencies mandated to conserve certain categories of species, agency personnel are challenged to find ways to practically implement new directives aimed at coping with climate change while retaining their species-centered mandate. Ecoregions and ecological classifications provide clear mechanisms to consider geodiversity in plans or decisions, the inclusion of which will help foster the resilience of conservation to climate change. Methods for biodiversity assessment, such as gap analysis, climate change vulnerability analysis, and ecological process modeling, can readily accommodate inclusion of a geophysical component. We adapted others' approaches for characterizing landscapes along a continuum of climate change vulnerability for the biota they support from resistant, to resilient, to susceptible, and to sensitive and then summarized options for integrating geodiversity into planning in each landscape type. In landscapes that are relatively resistant to climate change, options exist to fully represent geodiversity while ensuring that dynamic ecological processes can change over time. In more susceptible landscapes, strategies aiming to maintain or restore ecosystem resilience and connectivity are paramount. Implementing actions on the ground requires understanding of geophysical constraints on species and an increasingly nimble approach to establishing management and restoration goals. Because decisions that are implemented today will be revisited and amended into the future, increasingly sophisticated forms of monitoring and adaptation will be required to ensure that conservation efforts fully consider the value of geodiversity for supporting biodiversity in the face of a changing climate. © 2015 Society for Conservation Biology.

  18. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2001-03-01

    The John Day is the second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles--Oregon's third largest drainage basin--and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly amore » basin with national significance. Most all of the entire John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the Basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Using funding from the Bonneville Power Administration, Bureau of Reclamation, and others, the John Day Basin Office (JDBO) subcontracts the majority of its construction implementation activities with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/review, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2000, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional six watershed conservation projects funded by the BPA. The types of projects include permanent diversions, pump stations, and return-flow cooling systems. Project costs in 2000 totaled $533,196.00 with a total amount of $354,932.00 (67%) provided by the Bonneville Power Administration and the remainder coming from other sources such as the BOR, Oregon Watershed Enhancement Board, and individual landowners.« less

  19. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2001.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day River is the nation's second longest free-flowing river in the contiguous United States, which is entirely unsupplemented for it's runs of anadromous fish. Located in eastern Oregon, the John Day Basin drains over 8,000 square miles, is Oregon's fourth largest drainage basin, and the basin incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the mainstem John Day River flows 284 miles in a northwesterly direction entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon, summer steelhead, westslope cutthroat, and redband andmore » bull trout, the John Day system is truly a basin with national significance. The Majority of the John Day Basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in John Day to coordinate basin restoration projects, monitoring, planning, and other watershed restoration activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in John Day, who subcontracts the majority of the construction implementation activities for these restoration projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2001, the JDBO and GSWCD continued their successful partnership between the two agencies and basin landowners to implement an additional ten (10) watershed conservation projects. The project types include permanent lay flat diversions, pump stations, and return-flow cooling systems. Project costs in 2001 totaled $572,766.00 with $361,966.00 (67%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources, such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board (OWEB), and individual landowners.« less

  20. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day, who contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2002, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, riparian fencing, juniper control, permanent diversions, pump stations, infiltration galleries and return-flow cooling systems. Project costs in 2002 totaled $423,198.00 with a total amount of $345,752.00 (81%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  1. Developing a monitoring and evaluation framework to integrate and formalize the informal waste and recycling sector: the case of the Philippine National Framework Plan.

    PubMed

    Serrona, Kevin Roy B; Yu, Jeongsoo; Aguinaldo, Emelita; Florece, Leonardo M

    2014-09-01

    The Philippines has been making inroads in solid waste management with the enactment and implementation of the Republic Act 9003 or the Ecological Waste Management Act of 2000. Said legislation has had tremendous influence in terms of how the national and local government units confront the challenges of waste management in urban and rural areas using the reduce, reuse, recycle and recovery framework or 4Rs. One of the sectors needing assistance is the informal waste sector whose aspiration is legal recognition of their rank and integration of their waste recovery activities in mainstream waste management. To realize this, the Philippine National Solid Waste Management Commission initiated the formulation of the National Framework Plan for the Informal Waste Sector, which stipulates approaches, strategies and methodologies to concretely involve the said sector in different spheres of local waste management, such as collection, recycling and disposal. What needs to be fleshed out is the monitoring and evaluation component in order to gauge qualitative and quantitative achievements vis-a-vis the Framework Plan. In the process of providing an enabling environment for the informal waste sector, progress has to be monitored and verified qualitatively and quantitatively and measured against activities, outputs, objectives and goals. Using the Framework Plan as the reference, this article developed monitoring and evaluation indicators using the logical framework approach in project management. The primary objective is to institutionalize monitoring and evaluation, not just in informal waste sector plans, but in any waste management initiatives to ensure that envisaged goals are achieved. © The Author(s) 2014.

  2. Research and guidelines for implementing Fatigue Risk Management Systems for the French regional airlines.

    PubMed

    Cabon, Philippe; Deharvengt, Stephane; Grau, Jean Yves; Maille, Nicolas; Berechet, Ion; Mollard, Régis

    2012-03-01

    This paper describes research that aims to provide the overall scientific basis for implementation of a Fatigue Risk Management System (FRMS) for French regional airlines. The current research has evaluated the use of different tools and indicators that would be relevant candidates for integration into the FRMS. For the Fatigue Risk Management component, results show that biomathematical models of fatigue are useful tools to help an airline to prevent fatigue related to roster design and for the management of aircrew planning. The Fatigue Safety assurance includes two monitoring processes that have been evaluated during this research: systematic monitoring and focused monitoring. Systematic monitoring consists of the analysis of existing safety indicators such as Air Safety Reports (ASR) and Flight Data Monitoring (FDM). Results show a significant relationship between the hours of work and the frequency of ASR. Results for the FDM analysis show that some events are significantly related to the fatigue risk associated with the hours of works. Focused monitoring includes a website survey and specific in-flight observations and data collection. Sleep and fatigue measurements have been collected from 115 aircrews over 12-day periods (including rest periods). Before morning duties, results show a significant sleep reduction of up to 40% of the aircrews' usual sleep needs leading to a clear increase of fatigue during flights. From these results, specific guidelines are developed to help the airlines to implement the FRMS and for the airworthiness to oversight the implementation of the FRMS process. Copyright © 2011 Elsevier Ltd. All rights reserved.

  3. The Program for Regional and International Shorebird Monitoring (PRISM)

    USGS Publications Warehouse

    Bart, J.; Andres, B.; Brown, S.; Donaldson, G.; Harrington, B.; Johnston, V.; Jones, S.; Morrison, R.I.G.; Skagen, S.K.

    2005-01-01

    This report describes the "Program for Regional and International Shorebird Monitoring" (PRISM). PRISM is being implemented by a Canada-United States Shorebird Monitoring and Assessment Committee formed in 2001 by the Canadian Shorebird Working Group and the U.S. Shorebird Council. PRISM provides a single blueprint for implementing the shorebird conservation plans recently completed in Canada and the United States. The goals of PRISM are to (1) estimate the size of breeding population of 74 shorebird taxa in North America; (2) describe the distribution, abundance, and habitat relationships for each of these taxa; (3) monitor trends in shorebird population size; (4) monitor shorebird numbers at stopover locations, and; (5) assist local managers in meeting their shorebird conservation goals. PRISM has four main components: arctic and boreal breeding surveys, temperate breeding surveys, temperate non-breeding surveys, and neotropical surveys. Progress on, and action items for, each major component are described. The more important major tasks for immediate action are carrying out the northern surveys, conducting regional analyses to design the program of migration counts, and evaluating aerial photographic surveys for migration and winter counts.

  4. Barriers to Implementation of Recommendations for Transport of Children in Ground Ambulances.

    PubMed

    Woods, Rashida H; Shah, Manish; Doughty, Cara; Gilchrest, Anthony

    2017-10-16

    The National Highway Traffic Safety Administration (NHTSA) released draft recommendations in 2010 on the safe transport of children in ground ambulances. The purpose of this study was to assess awareness of these guidelines among emergency medical service (EMS) agencies and to identify implementation barriers. We conducted a cross-sectional, anonymous online survey of 911-responding, ground transport EMS agencies in Texas. Demographics, modes of transport based on case scenarios, and barriers to implementation were assessed. Of 62 eligible EMS agencies that took the survey, 35.7% were aware of the NHTSA guidelines, 62.5% agreed they would improve safety, and 41.1% planned to implement them. Seventy-five percent of EMS agencies used the ideal or acceptable alternative to transport children requiring continuous monitoring, and 69.5% chose ideal or acceptable alternatives for children requiring spinal immobilization. The ideal or acceptable alternative was not chosen for children who were not injured or ill (93.2%), ill or injured but not requiring continuous monitoring (53.3%), and situations when multiple patients required transport (57.6%). The main requirements for implementation were provider education, ambulance interior modifications, new guidelines in the EMS agency, and purchase of new equipment. Few EMS agencies are aware of the NHTSA guidelines on safe transport of children in ground ambulances. Although most agencies appropriately transport children who require monitoring, interventions, or spinal immobilization, they use inappropriate means to transport children in situations with multiple patients, lack of injury or illness, or lack of need for monitoring.

  5. Use of theoretical waste inventories in planning and monitoring of hazardous waste management systems.

    PubMed

    Yilmaz, Ozge; Can, Zehra S; Toroz, Ismail; Dogan, Ozgur; Oncel, Salim; Alp, Emre; Dilek, Filiz B; Karanfil, Tanju; Yetis, Ulku

    2014-08-01

    Hazardous waste (HW) generation information is an absolute necessity for ensuring the proper planning, implementation, and monitoring of any waste management system. Unfortunately, environmental agencies in developing countries face difficulties in gathering data directly from the creators of such wastes. It is possible, however, to construct theoretical HW inventories using the waste generation factors (WGFs). The objective of this study was to develop a complete nationwide HW inventory of Turkey that relies on nation-specific WGFs to support management activities of the Turkish Ministry of Environment and Urbanization (MoEU). Inventory studies relied on WGFs from: (a) the literature and (b) field studies and analysis of waste declarations reflecting country-specific industrial practices. Moreover, new tools were introduced to the monitoring infrastructure of MoEU to obtain a comprehensive waste generation data set. Through field studies and a consideration of country specific conditions, it was possible to more thoroughly elucidate HW generation trends in Turkey, a method that was deemed superior to other alternatives. Declaration and literature based WGFs also proved most helpful in supplementing field observations that could not always be conducted. It was determined that these theoretical inventories could become valuable assets in supporting regulating agencies in developing countries for a more thorough implementation of HW management systems. © The Author(s) 2014.

  6. Coordinated bird monitoring: Technical recommendations for military lands

    USGS Publications Warehouse

    Bart, Jonathan; Manning, Ann; Fischer, Richard; Eberly, Chris

    2012-01-01

    The Department of Defense (DoD) is subject to several rules and regulations establishing responsibilities for monitoring migratory birds. The Sikes Act requires all military installations with significant natural resources to prepare and implement Integrated Natural Resources Management Plans (INRMPs). These plans guide the conservation and long-term management of natural resources on military lands in a manner that is compatible with and sustains the military mission. An INRMP also supports compliance with all legal requirements and guides the military in fulfilling its obligation to be a good steward of public land.The management and conservation of migratory birds is addressed in installation INRMPs. The National Environmental Policy Act (NEPA) requires federal agencies to evaluate and disclose the potential environmental impacts of their proposed actions. More recently, DoD signed an MOU (http://www.dodpif.org/downloads/EO13186_MOU-DoD.pdf) for migratory birds, under Executive Order 13186, with the US Fish and Wildlife Service (USFWS) in July 2006 and a Migratory Bird Rule (http://www.dodpif.org/downloads/MigBirdFINALRule_FRFeb2007.pdf) was passed by Congress in February 2007. The Migratory Bird Rule addresses the potential impacts of military readiness activities on populations of migratory birds and establishes a process to implement conservation measures if and when a military readiness activity is expected to have a significant adverse impact on a population of migratory bird species (as determined through the NEPA process). The MOU states that for nonmilitary readiness activities, prior to initiating any activity likely to affect populations of migratory birds DoD shall (1) identify the migratory bird species likely to occur in the area of the proposed action and determine if any species of concern could be affected by the activity, and (2) assess and document, using NEPA when applicable, the effect of the proposed action on species of concern. By following these procedures, DoD will minimize the possibility for a proposed action to unintentionally take migratory birds at a level that would violate any of the migratory bird treaties and potentially impact mission activities. In addition, implementing conservation and monitoring programs for migratory birds supports the ecosystem integrity necessary to sustain DoD's natural resources for the military mission.Non-compliance with the procedural requirements of the MBTA could result in a private party lawsuit under the Administrative Procedures Act (APA). A lawsuit filed under APA involving a Navy bombing range is the basis for a court ruling that unintentional take of migratory birds applies to federal actions. Ensuring the necessary data is available to adequately assess impacts of a proposed action will help avoid lawsuits or help ensure such lawsuits have no grounds. The data gathered in a bird monitoring program will provide the best scientific data available to assess the expected impacts of a proposed action on migratory bird species through the NEPA process. This report presents recommendations developed by the U.S. Geological Survey (USGS) for the Department of Defense (DoD) on establishing a "Coordinated Bird Monitoring (CBM) Plan." The CBM Plan is intended to ensure that DoD meets its conservation and regulatory responsibilities for monitoring birds (Chapter 1). The report relies heavily on recommendations in the report, "Opportunities for improving avian monitoring" (http://www.nabci-us.org/aboutnabci/monitoringreportfinal0307.pdf), by the U.S. North American Bird Conservation Initiative (U.S. NABCI Monitoring Subcommittee, 2007) and on a review of 358 current DoD bird monitoring programs carried out as part of this project (Chapter 2). This report contains 12 recommendations which, if followed, would result in a comprehensive, efficient, and useful approach to bird monitoring. The recommendations are based on the entire report but are presented together at the end of Chapter 1. DoD has agreed to consider implementing these recommendations; however, final decisions will be based upon such factors as the availability of resources and military mission considerations. These recommendations from USGS can be summarized into 6 major themes: A major report on monitoring was released in 2007 by the U.S. North American Bird Conservation Initiative (http://www.nabci-us.org/main2.html). DoD can be consistent with this report by establishing policy that monitoring will be explicitly acknowledged as an integral element of bird management and conservation (Recommendation 1). The design of monitoring and assessment programs for birds should include the following steps: Preparation of a document describing the program's goals, objectives, and methods similar to a format we provide (Recommendation 2, Chapter 4). Selection of field methods using an "expert system" developed in this project (Recommendation 3, Chapter 5) or another well-documented system. Preparation and storage of metadata describing the monitoring program in the Natural Resources Monitoring Partnership (NRMP), and other appropriate databases Recommendation 4, Chapter 6). Entry of the survey data using eBird (http://ebird.org/content/dod) or the Coordinated Bird Monitoring Database (CBMD) and long-term storage of the data in the CBMD and the Avian Knowledge Network (AKN; Recommendation 5, Chapter 6; http://www.avianknowledge.net/). Submission of major results from the monitoring program for publication in a peer reviewed journal (Recommendation 6). The DoD Legacy Resource Management Program (Legacy; https://www.dodlegacy.org), Environmental Security Technology Certification Program (ESTCP; http://www.serdp.org/), and Strategic Environmental Research and Development Program (SERDP; http://www.serdp.org/) should be encouraged to continue their significant contributions to the foundations of bird monitoring (Recommendation 7, Chapters 1 and 3). Appropriate monitoring should be conducted to identify species of concern on installations. A year-round, one-time survey of birds on installations with habitat for migratory birds would provide the most information to assist compliance with the MOU, the Final Rule, and the NEPA analyses of proposed actions. However, less intensive survey efforts can still be conducted to yield useful information. We describe how various levels of survey effort might be organized and conducted. In addition, continuing surveys, as feasible, would further assist in documenting effects of military readiness and non-readiness activities on species of concern (SOC) (Recommendation 8, Chapter 7). Participation in well-designed, large-scale surveys [(e.g., North American Breeding Bird Survey (BBS; http://www.pwrc.usgs.gov/bbs/), Monitoring Avian Productivity and Survivorship (MAPS; http://www.birdpop.org/maps.htm)] on land that DoD manages or on lands where the results will be of high interest to DoD, will provide DoD and other NABCI members with information important to bird conservation (Recommendation 9, Chapter 8). Review and implementation of the CBM Plan should involve both higher level management and installation-level natural resources managers (Recommendation 11), be implemented through cooperative partnerships (Recommendation 12), and be followed on U.S territory lands and Army Corps of Engineers projects (Recommendation 10).Additional recommendations that pertain to implementing the DoD CBM Plan are discussed in Chapter 9.

  7. Supporting local planning and budgeting for maternal, neonatal and child health in the Philippines

    PubMed Central

    2013-01-01

    Background Responsibility for planning and delivery of health services in the Philippines is devolved to the local government level. Given the recognised need to strengthen capacity for local planning and budgeting, we implemented Investment Cases (IC) for Maternal, Neonatal and Child Health (MNCH) in three selected sub-national units: two poor, rural provinces and one highly-urbanised city. The IC combines structured problem-solving by local policymakers and planners to identify key health system constraints and strategies to scale-up critical MNCH interventions with a decision-support model to estimate the cost and impact of different scaling-up scenarios. Methods We outline how the initiative was implemented, the aspects that worked well, and the key limitations identified in the sub-national application of this approach. Results Local officials found the structured analysis of health system constraints helpful to identify problems and select locally appropriate strategies. In particular the process was an improvement on standard approaches that focused only on supply-side issues. However, the lack of data available at the local level is a major impediment to planning. While the majority of the strategies recommended by the IC were incorporated into the 2011 plans and budgets in the three study sites, one key strategy in the participating city was subsequently reversed in 2012. Higher level systemic issues are likely to have influenced use of evidence in plans and budgets and implementation of strategies. Conclusions Efforts should be made to improve locally-representative data through routine information systems for planning and monitoring purposes. Even with sound plans and budgets, evidence is only one factor influencing investments in health. Political considerations at a local level and issues related to decentralisation, influence prioritisation and implementation of plans. In addition to the strengthening of capacity at local level, a parallel process at a higher level of government to relieve fund channelling and coordination issues is critical for any evidence-based planning approach to have a significant impact on health service delivery. PMID:23343218

  8. Integrating wireless sensor network for monitoring subsidence phenomena

    NASA Astrophysics Data System (ADS)

    Marturià, Jordi; Lopez, Ferran; Gigli, Giovanni; Intrieri, Emanuele; Mucchi, Lorenzo; Fornaciai, Alessandro

    2016-04-01

    An innovative wireless sensor network (WSN) for the 3D superficial monitoring of deformations (such as landslides and subsidence) is being developed in the frame of the Wi-GIM project (Wireless sensor network for Ground Instability Monitoring - LIFE12 ENV/IT/001033). The surface movement is detected acquiring the position (x, y and z) by integrating large bandwidth technology able to detect the 3D coordinates of the sensor with a sub-meter error, with continuous wave radar, which allows decreasing the error down to sub-cm. The Estació neighborhood in Sallent is located over the old potassium mine Enrique. This zone has been affected by a subsidence process over more than twenty years. The implementation of a wide network for ground auscultation has allowed monitoring the process of subsidence since 1997. This network consists of: i) a high-precision topographic leveling network to control the subsidence in surface; ii) a rod extensometers network to monitor subsurface deformation; iii) an automatic Leica TCA Total Station to monitor building movements; iv) an inclinometers network to measure the horizontal displacements on subsurface and v) a piezometer to measure the water level. Those networks were implemented within an alert system for an organized an efficient response of the civil protection authorities in case of an emergency. On 23rd December 2008, an acceleration of subsoil movements (of approx. 12-18 cm/year) provoked the activation of the emergency plan by the Catalan Civil Protection. This implied the preventive and scheduled evacuation of the neighbours (January 2009) located in the area with a higher risk of collapse: around 120 residents of 43 homes. As a consequence, the administration implemented a compensation plan for the evacuation of the whole neighbourhood residents and the demolition of 405 properties. In this work, the adaptation and integration process of Wi-GIM system with those conventional monitoring network are presented for its testing and evaluation. The knowledge gained in the subsidence process, complemented by the huge availability of data from existing networks constitutes a solid foundation for achieving those objectives. New monitoring points have been identified, constructed, prepared to integrate the conventional monitoring system with Wi-GIM system to build a robust system compatible with WI-GIM requirements.

  9. 77 FR 34288 - Approval and Promulgation of Implementation Plans; Alabama; 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... otherwise protected. The www.regulations.gov Web site is an ``anonymous access'' system, which means EPA... requirements, including emissions inventories, monitoring, and modeling to assure attainment and maintenance of... July 6, 2011, WildEarth Guardians and Sierra Club filed an amended complaint related to EPA's failure...

  10. 77 FR 34906 - Approval and Promulgation of Implementation Plans; Florida; 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... otherwise protected. The www.regulations.gov Web site is an ``anonymous access'' system, which means EPA... requirements, including emissions inventories, monitoring, and modeling to assure attainment and maintenance of... July 6, 2011, WildEarth Guardians and Sierra Club filed an amended complaint related to EPA's failure...

  11. 40 CFR 63.653 - Monitoring, recordkeeping, and implementation plan for emissions averaging.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 63.120 of subpart G; and (ii) For closed vent systems with control devices, conduct an initial design... different times, and/or in different submittals, later submittals may refer to earlier submittals instead of... controlled using a treatment process or series of treatment processes that achieves an emission reduction...

  12. 78 FR 17168 - Approval and Promulgation of Implementation Plans; Tennessee; 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... and new source review (NSR).\\4\\ \\4\\ This rulemaking only addresses requirements for this element as...)(2)(E): Adequate personnel, funding, and authority. 110(a)(2)(F): Stationary source monitoring and... related to excess emissions during periods of start-up, shutdown, or malfunction at sources (SSM), that...

  13. 75 FR 62470 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... Purposes; Tennessee: Knoxville; Determination of Attaining Data for the 1997 8-Hour Ozone Standards AGENCY... make a determination that the Knoxville, Tennessee nonattainment area for the 1997 8-hour ozone..., quality controlled monitoring data from 2007 through 2009. The Knoxville 1997 8-hour ozone nonattainment...

  14. 40 CFR 49.160 - Registration program for minor sources in Indian country.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plan Provisions Federal Minor New Source Review Program in Indian Country § 49.160 Registration...) Identification and description of any existing air pollution control equipment and compliance monitoring devices.... (ii) If your true minor source is not an oil and natural gas source and you commence construction...

  15. 78 FR 70248 - Approval and Promulgation of Implementation Plans; Commonwealth of the Northern Mariana Islands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... source baseline date (and trigger date) under the PSD program in CNMI for sulfur dioxide, PM 10 and... for new or modified major stationary sources (``New Source Review,'' or NSR), programs for monitoring... 1975, EPA modified part 52 by incorporating specific PSD disapprovals into the applicable subpart for...

  16. 78 FR 19125 - Approval and Disapproval and Promulgation of Air Quality Implementation Plans; Colorado; Revision...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... apply. The State also added or modified the definitions of the following terms: continuous monitoring... approving specific definitions that were added or modified with the June 20, 2003 Common Provisions... reasons discussed in the notice of our proposed action, 76 FR 4268, EPA is disapproving the modified...

  17. The Board's Role in Fund-Raising. The Fundamentals. Board Basics.

    ERIC Educational Resources Information Center

    Legon, Richard D.

    1997-01-01

    Fund-raising is one of the college or university governing board's most basic and important responsibilities: The annual fund is the platform from which all other fund-raising activities flow, and the board plays a key role in planning, implementing, and monitoring comprehensive campaigns, which are major efforts, focused on long-range financial…

  18. 75 FR 43062 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Emissions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... ozone precursor gases during the winter and summer months, respectively. The revisions also allow for... dioxide, ozone, lead (Pb), particulate matter (PM), and sulfur dioxide (SO 2 ). A SIP is a set of air... supporting information such as emissions inventories, monitoring networks, and modeling demonstrations. Each...

  19. 76 FR 57691 - Approval and Promulgation of Implementation Plans; New Jersey; Motor Vehicle Enhanced Inspection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... remaining monitors (catalyst, evaporative system, oxygen sensor, heated oxygen sensor, and exhaust gas...--1968-1971 MY converter, presence of converter, presence of inclusive a gas cap, and fuel a gas cap, and fuel Exhaust Gas inlet restrictor--1975 inlet restrictor--1975 Recirculation (EGR) and newer (beginning...

  20. 77 FR 13238 - Partial Approval and Promulgation of Implementation Plans; Washington: Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... from the Washington State Department of Ecology (Ecology) to demonstrate that the SIP meets the...; Chapter 43.21 RCW Department of Ecology; Chapter 34.05 RCW Administrative Procedure Act; Chapter 42.30 RCW...) which requires Ecology to provide for or conduct surveillance program that: monitors the quality of the...

  1. 78 FR 72040 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... ambient ozone monitoring stations in the Atlanta Area from 2008-2011, as recorded in Air Quality System... redesignation request to change the legal designation of the Atlanta Area from nonattainment to attainment for... to change. Comment 2: The Commenter contends that Georgia's redesignation submittal is flawed because...

  2. 76 FR 46083 - Secondary National Ambient Air Quality Standards for Oxides of Nitrogen and Sulfur

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-01

    ...-1145, by one of the following methods: http://www.regulations.gov : Follow the on-line instructions for..., Research Triangle Park, NC 27711; telephone: 919- 541-4650; fax: 919-541-2357; e-mail: [email protected] Complementary Areas of Research Implementation Challenges 5. Final Monitoring Plan Development and Stakeholder...

  3. Effluent Monitoring Procedures: Basic Parameters for Municipal Effluents. Staff Guide.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This is one of several short-term courses developed to assist in the training of waste water treatment plant operational personnel in the tests, measurements, and report preparation required for compliance with their NPDES Permits. This Staff Guide provides step-by-step guidelines on course planning, development and implementation involving…

  4. 77 FR 14712 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... Massachusetts Department of Environmental Protection performed a missing data analysis for each site with low... Massachusetts missing data analysis used a combination of meteorology and air quality data for ozone monitors... with missing ozone data, the ozone levels, if captured, would have been below the 1997 8-hour ozone...

  5. Effects of Self-Monitoring, Likability and Argument Strength on Persuasion.

    ERIC Educational Resources Information Center

    Harnish, Richard J.

    Recently, there has been a renewed interest in the functional theories of attitudes. These theories assume that there are certain individualistic needs that are being met by one's attitudes, and that these attitudes allow the individual to implement certain plans to attain certain goals. This study examined whether source characteristics (i.e.,…

  6. 75 FR 18757 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Alternate Monitoring...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-13

    ... Station Unit 7. The scrubber adds moisture to the exhaust gas, which condenses as the gas stream cools. According to Indiana Department of Environmental Management (IDEM), the condensation causes unreliable... impairment caused by particulate and light impairment caused by moisture. The scrubber also removes some PM...

  7. 49 CFR 195.446 - Control room management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...

  8. 49 CFR 195.446 - Control room management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...

  9. 49 CFR 195.446 - Control room management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...

  10. 49 CFR 195.446 - Control room management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... intervals not exceeding 15 months, to determine the effectiveness of the plan; (5) Monitor the content and...)(5), (d)(2) and (d)(3), (f) and (g) of this section must be implemented no later than October 1, 2011... of the pipeline safely, at least once each calendar year, but at intervals not to exceed 15 months...

  11. 29 CFR Appendix E to Subpart M of... - Sample Fall Protection Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... through holes and openings in walking/working surfaces. Each employee will be trained in these procedures..., implemented, monitored and enforced by any one individual. The total objective of a safe, accident free work environment can only be accomplished by a dedicated, concerted effort by every individual involved with the...

  12. 76 FR 16358 - Approval and Promulgation of Air Quality Implementation Plans; Connecticut, Maine, New Hampshire...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Protection, State Office Building, 79 Elm Street, Hartford, CT 06106- 1630; the Bureau of Air Quality Control... evaluation of the States' submittals? A. Emission Limits and Other Control Measures B. Ambient Air Quality Monitoring/Data System C. Program for Enforcement of Control Measures D. Interstate Transport E. Adequate...

  13. 76 FR 68699 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Adoption of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ... river basin with spikes in localized PM 2.5 concentrations that coincide with temperature inversions... an inversion break, the monitor returns to a level comparable to, and sometimes less than, the... often occur within the Liberty-Clairton Area during periods of strong nocturnal inversions. When this...

  14. Sediment transport by irrigation return flows in four small drains within the DID-18 drainage of the Sulphur Creek basin, Yakima County, Washington, April 1979 to October 1981

    USGS Publications Warehouse

    Boucher, P.R.

    1984-01-01

    Suspended sediment, water discharges, and water temperatures were monitored in four small drains in the DID-18 basin of the Sulphur Creek basin, a tributary to the Yakima River, Washington. Water outflow, inflow, and miscellaneous sites were also monitored. The information was used to evaluate the effectiveness of management practices in reducing sediment loads in irrigated areas. This study was one of seven Model Implementation Plan projects selected by the U.S. Soil Conservation Service and the U.S. Environmental Protection Agency to demonstrate the effectiveness of institutional and administrative implementation of management plans. Sediment discharges from the four basins could not be correlated with changes in management practices, because Imhoff Cone readings collected for the study showed no statistical differences between the three irrigation seasons. However, one drain acted as a sink for sediment where more lands were sprinkler irrigated; this drain had a smaller proportion of row crops than did the other three drains. (USGS)

  15. Bathymetric surveys of the Kootenai River near Bonners Ferry, Idaho, water year 2011

    USGS Publications Warehouse

    Fosness, Ryan L.

    2013-01-01

    In 2009, the Kootenai Tribe of Idaho released and implemented the Kootenai River Habitat Restoration Master Plan. This plan aimed to restore, enhance, and maintain the Kootenai River habitat and landscape to support and sustain habitat conditions for aquatic species and animal populations. In support of these restoration efforts, the U.S. Geological Survey, in cooperation with the Kootenai Tribe of Idaho, conducted high-resolution multibeam echosounder bathymetric surveys in May, June, and July 2011, as a baseline bathymetric monitoring survey on the Kootenai River near Bonners Ferry, Idaho. Three channel patterns or reaches exist in the study area—braided, meander, and a transitional zone connecting the braided and meander reaches. Bathymetric data were collected at three study areas in 2011 to provide: (1) surveys in unmapped portions of the meander reach; (2) monitoring of the presence and extent of sand along planned lines within a section of the meander reach; and (3) monitoring aggradation and degradation of the channel bed at specific cross sections within the braided reach and transitional zone. The bathymetric data will be used to update and verify flow models, calibrate and verify sediment transport modeling efforts, and aid in the biological assessment in support of the Kootenai River Habitat Restoration Master Plan. The data and planned lines for each study reach were produced in ASCII XYZ format supported by most geospatial software.

  16. Population Activities Fund Agency (PAFA): the journey so far.

    PubMed

    1993-01-01

    Mechanisms are needed funding Nigerian Federal efforts to implement the National Policy on Population for Development, which was approved by the Armed Forces Ruling Council in February, 1988. Subprojects of the Population Activities Fund Agency (PAFA) which were approves are: the integration of family planning (FP) into maternal and child health (MCH) the promotion of Fp through health education, tertiary centers for reproductive health, public enlightenment on population, population/family life education in primary schools, monitoring of National Population Project impact, and integration of population into planning and budgeting. The last obstacle to implementation of PAFA's activities is the signing into law the decree establishing PAFA as a parastatal. The passage is required for continued operations. The national Population for Development policy is unique in providing for quantitative targets, which has attracted the needed financial support of agencies such as the World Bank. As part of the National Population Policy, the National Population Program (NPP) is developing an effective strategy for securing funding and evaluation of subprojects that are designed and implemented b Collaborating Agencies (CAs), both private and public. NPP aims 1) to provide funds for qualified CAs through the Population Activities Fund (PAF) and Agency (PAFA); 2) to monitor PAFA, which manages PAf with the Department of Population Activities, and 3) to stimulate analysis of sociocultural constraints to fertility reduction and international comparisons, and to design innovative interventions through the Population Research Fund (PRF). PAFA funds implementing agencies at all government and nongovernment levels with approaches to population information and services. The goal of PAFA is to realize NPP objectives. The motto is "Towards an improved quality of life for every Nigerian." The mandate is to provide funding for the PAF and NPP, to monitor CAs, to provide assistance to CAs preparing Phase II subprojects, and to supervise and guide CAs on funding, procurement, and implementation.

  17. StarPlan: A model-based diagnostic system for spacecraft

    NASA Technical Reports Server (NTRS)

    Heher, Dennis; Pownall, Paul

    1990-01-01

    The Sunnyvale Division of Ford Aerospace created a model-based reasoning capability for diagnosing faults in space systems. The approach employs reasoning about a model of the domain (as it is designed to operate) to explain differences between expected and actual telemetry; i.e., to identify the root cause of the discrepancy (at an appropriate level of detail) and determine necessary corrective action. A development environment, named Paragon, was implemented to support both model-building and reasoning. The major benefit of the model-based approach is the capability for the intelligent system to handle faults that were not anticipated by a human expert. The feasibility of this approach for diagnosing problems in a spacecraft was demonstrated in a prototype system, named StarPlan. Reasoning modules within StarPlan detect anomalous telemetry, establish goals for returning the telemetry to nominal values, and create a command plan for attaining the goals. Before commands are implemented, their effects are simulated to assure convergence toward the goal. After the commands are issued, the telemetry is monitored to assure that the plan is successful. These features of StarPlan, along with associated concerns, issues and future directions, are discussed.

  18. A new methodology to identify surface water bodies at risk by using pesticide monitoring data: The glyphosate case study in Lombardy Region (Italy).

    PubMed

    Di Guardo, Andrea; Finizio, Antonio

    2018-01-01

    In the last decades, several monitoring programs were established as an effect of EU Directives addressing the quality of water resources (drinking water, groundwater and surface water). Plant Protection Products (PPPs) are an obvious target of monitoring activities, since they are directly released into the environment. One of the challenges in managing the risk of pesticides at the territorial scale is identifying the locations in water bodies needing implementation of risk mitigation measures. In this, the national pesticides monitoring plans could be very helpful. However, monitoring of pesticides is a challenging task because of the high number of registered pesticides, cost of analyses, and the periodicity of sampling related to pesticide application and use. Extensive high-quality data-sets are consequently often missing. More in general, the information that can be obtained from monitoring studies are frequently undervalued by risk managers. In this study, we propose a new methodology providing indications about the need to implement mitigation measures in stretches of surface water bodies on a territory by combining historical series of monitoring data and GIS. The methodology is articulated in two distinct phases: a) acquisition of monitoring data and setting-up of informative layers of georeferenced data (phase 1) and b) statistical and expert analysis for the identification of areas where implementation of limitation or mitigation measures are suggested (phase 2). Our methodology identifies potentially vulnerable water bodies, considering temporal contamination trends and relative risk levels at selected monitoring stations. A case study is presented considering glyphosate monitoring data in Lombardy Region (Northern of Italy) for the 2008-2014 period. Copyright © 2017 Elsevier B.V. All rights reserved.

  19. AUTOMATED RADIOLOGICAL MONITORING AT A RUSSIAN MINISTRY OF DEFENCE NAVAL SITE.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MOSKOWITZ,P.D.; POMERVILLE,J.; GAVRILOV,S.

    2001-02-25

    The Arctic Military Environmental Cooperation (AMEC) Program is a cooperative effort between the military establishments of the Kingdom of Norway, the Russian Federation, and the US. This paper discusses joint activities conducted over the past year among Norwegian, Russian, and US technical experts on a project to develop, demonstrate and implement automated radiological monitoring at Russian Navy facilities engaged in the dismantlement of nuclear-powered strategic ballistic missile launching submarines. Radiological monitoring is needed at these facilities to help protect workers engaged in the dismantlement program and the public living within the footprint of routine and accidental radiation exposure areas. Bymore » providing remote stand-alone monitoring, the Russian Navy will achieve added protection due to the defense-in-depth strategy afforded by local (at the site), regional (Kola) and national-level (Moscow) oversight. The system being implemented at the Polyaminsky Russian Naval Shipyard was developed from a working model tested at the Russian Institute for Nuclear Safety, Moscow, Russia. It includes Russian manufactured terrestrial and underwater gamma detectors, smart controllers for graded sampling, radio-modems for offsite transmission of the data, and a data fusion/display system: The data fusion/display system is derived from the Norwegian Picasso AMEC Environmental Monitoring software package. This computer package allows monitoring personnel to review the real-time and historical status of monitoring at specific sites and objects and to establish new monitoring protocols as required, for example, in an off-normal accident situation. Plans are being developed to implement the use of this system at most RF Naval sites handling spent nuclear fuel.« less

  20. AUTOMATED RADIOLOGICAL MONITORING AT A RUSSIAN MINISTRY OF DEFENSE NAVAL SITE.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MOSKOWITZ,P.D.; POMERVILLE,J.; GAVRILOV,S.

    2001-02-25

    The Arctic Military Environmental Cooperation (AMEC) Program is a cooperative effort between the military establishments of the Kingdom of Norway, the Russian Federation, and the US. This paper discusses joint activities conducted over the past year among Norwegian, Russian, and US technical experts on a project to develop, demonstrate and implement automated radiological monitoring at Russian Navy facilities engaged in the dismantlement of nuclear-powered strategic ballistic missile launching submarines. Radiological monitoring is needed at these facilities to help protect workers engaged in the dismantlement program and the public living within the footprint of routine and accidental radiation exposure areas. Bymore » providing remote stand-alone monitoring, the Russian Navy will achieve added protection due to the defense-in-depth strategy afforded by local (at the site), regional (Kola) and national-level (Moscow) oversight. The system being implemented at the Polyaminsky Russian Naval Shipyard was developed from a working model tested at the Russian Institute for Nuclear Safety, Moscow, Russia. It includes Russian manufactured terrestrial and underwater gamma detectors, smart controllers for graded sampling, radio-modems for offsite transmission of the data, and a data fusion/display system: The data fusion/display system is derived from the Norwegian Picasso AMEC Environmental Monitoring software package. This computer package allows monitoring personnel to review the real-time and historical status of monitoring at specific sites and objects and to establish new monitoring protocols as required, for example, in an off-normal accident situation. Plans are being developed to implement the use of this system at most RF Naval sites handling spent nuclear fuel.« less

  1. Analysis of Land Use Change and Urbanization in the Kucukcekmece Water Basin (Istanbul, Turkey) with Temporal Satellite Data using Remote Sensing and GIS.

    PubMed

    Coskun, H Gonca; Alganci, Ugur; Usta, Gokce

    2008-11-13

    Accurate and timely information about land use and land cover (LULC) and its changes in urban areas are crucial for urban land management decision-making, ecosystem monitoring and urban planning. Also, monitoring and representation of urban sprawl and its effects on the LULC patterns and hydrological processes of an urbanized watershed is an essential part of water resource planning and management. This paper presents an image analysis study using multi temporal digital satellite imagery of LULC and changes in the Kucukcekmece Watershed (Metropolitan Istanbul, Turkey) from 1992 to 2006. The Kucukcekmece Basin includes portions of the Kucukcekmece District within the municipality of Istanbul so it faces a dramatic urbanization. An urban monitoring analysis approach was first used to implement a land cover classification. A change detection method controlled with ground truth information was then used to determine changes in land cover. During the study period, the variability and magnitude of hydrological components based on land-use patterns were cumulatively influenced by urban sprawl in the watershed. The proposed approach, which uses a combination of Remote Sensing (RS) and Geographical Information System (GIS) techniques, is an effective tool that enhances land-use monitoring, planning, and management of urbanized watersheds.

  2. Analysis of Land Use Change and Urbanization in the Kucukcekmece Water Basin (Istanbul, Turkey) with Temporal Satellite Data using Remote Sensing and GIS

    PubMed Central

    Coskun, H. Gonca; Alganci, Ugur; Usta, Gokce

    2008-01-01

    Accurate and timely information about land use and land cover (LULC) and its changes in urban areas are crucial for urban land management decision-making, ecosystem monitoring and urban planning. Also, monitoring and representation of urban sprawl and its effects on the LULC patterns and hydrological processes of an urbanized watershed is an essential part of water resource planning and management. This paper presents an image analysis study using multi temporal digital satellite imagery of LULC and changes in the Kucukcekmece Watershed (Metropolitan Istanbul, Turkey) from 1992 to 2006. The Kucukcekmece Basin includes portions of the Kucukcekmece District within the municipality of Istanbul so it faces a dramatic urbanization. An urban monitoring analysis approach was first used to implement a land cover classification. A change detection method controlled with ground truth information was then used to determine changes in land cover. During the study period, the variability and magnitude of hydrological components based on land-use patterns were cumulatively influenced by urban sprawl in the watershed. The proposed approach, which uses a combination of Remote Sensing (RS) and Geographical Information System (GIS) techniques, is an effective tool that enhances land-use monitoring, planning, and management of urbanized watersheds. PMID:27873924

  3. Remote monitoring as a tool in condition assessment of a highway bridge

    NASA Astrophysics Data System (ADS)

    Tantele, Elia A.; Votsis, Renos A.; Onoufriou, Toula; Milis, Marios; Kareklas, George

    2016-08-01

    The deterioration of civil infrastructure and their subsequent maintenance is a significant problem for the responsible managing authorities. The ideal scenario is to detect deterioration and/or structural problems at early stages so that the maintenance cost is kept low and the safety of the infrastructure remains undisputed. The current inspection regimes implemented mostly via visual inspection are planned at specific intervals but are not always executed on time due to shortcomings in expert personnel and finance. However the introduction of technological advances in the assessment of infrastructures provides the tools to alleviate this problem. This study describes the assessment of a highway RC bridge's structural condition using remote structural health monitoring. A monitoring plan is implemented focusing on strain measurements; as strain is a parameter influenced by the environmental conditions supplementary data are provided from temperature and wind sensors. The data are acquired using wired sensors (deployed at specific locations) which are connected to a wireless sensor unit installed at the bridge. This WSN application enables the transmission of the raw data from the field to the office for processing and evaluation. The processed data are then used to assess the condition of the bridge. This case study, which is part of an undergoing RPF research project, illustrates that remote monitoring can alleviate the problem of missing structural inspections. Additionally, shows its potential to be the main part of a fully automated smart procedure of obtaining structural data, processed them and trigger an alarm when certain undesirable conditions are met.

  4. Addressing the third delay: implementing a novel obstetric triage system in Ghana.

    PubMed

    Goodman, David M; Srofenyoh, Emmanuel K; Ramaswamy, Rohit; Bryce, Fiona; Floyd, Liz; Olufolabi, Adeyemi; Tetteh, Cecilia; Owen, Medge D

    2018-01-01

    Institutional delivery has been proposed as a method for reducing maternal morbidity and mortality, but little is known about how referral hospitals in low-resource settings can best manage the expected influx of patients. In this study, we assess the impact of an obstetric triage improvement programme on reducing hospital-based delay in a referral hospital in Accra, Ghana. An Active Implementation Framework is used to describe a 5-year intervention to introduce and monitor obstetric triage capabilities. Baseline data, collected from September to November 2012, revealed significant delays in patient assessment on arrival. A triage training course and monitoring of quality improvement tools occurred in 2013 and 2014. Implementation barriers led to the construction of a free-standing obstetric triage pavilion, opened January 2015, with dedicated midwives. Data were collected at three time intervals following the triage pavilion opening and compared with baseline including: referral indications, patient and labour characteristics, waiting time from arrival to assessment and the documentation of a care plan. An obstetric triage improvement programme reduced the median (IQR) patient waiting time from facility arrival to first assessment by a midwife from 40 min (15-100) to 5 min (2-6) (p<0.001) over the 5-year intervention. The triage pavilion enhanced performance resulting in the elimination of previous delays associated with the time of admission and disease acuity. Care plan documentation increased from 51% to 96%. Obstetric triage, when properly implemented, reduced delay in a busy, low-resource hospital. The implementation process was sustained under local leadership during transition to a new hospital.

  5. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Ogburn, Parker N.

    2003-03-01

    This is the second annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2001: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring chinook Supplementation Program (GRESCP). (2) Plan detailed GRESCP Monitoring and Evaluation for future years. (3)more » Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (4) Plan for data collection needs for bull trout. (5) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (6) Collect summer steelhead. (7) Monitor adult endemic spring chinook salmon populations and collect broodstock. (8) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (9) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations. (10) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (11) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program. (12) Monitor water quality at facilities. (13) Document accomplishments and needs to permitters, comanagers, and funding agencies. (14) Communicate Project results to the scientific community.« less

  6. [The regional model of three-level system of of medical social monitoring of children and adolescents: the pilot project in the Republic of Tatarstan].

    PubMed

    Al'bitskii, V Iu; Ustinova, N V; Farrakhov, A Z; Shavaliev, R F; Kulikov O V; Plaksina, L V

    2014-01-01

    The absence of system of medical social monitoring of children being in difficult life situations is one of main causes of preventable losses of health and life of children and adolescents. The plan of activities of the working group No3 under the Coordination council under the President of the Russian Federation of the national strategy realization of actions in interest of children for 2012-2017 includes a point: "The development and implementation of standard model of medical social monitoring of children and adolescents in the subjects of the Russian Federation". The implementation of this task is assigned to the Department of social pediatrics of The research center of children health of Moscow and the Ministry of Health of the Republic of Tatarstan. The research methods included analysis and generalization of advanced experience of medical social monitoring of children population; expertise technique; modeling. The regional model of three-level system of medical social monitoring of children population is developed and implemented. The model includes level I (consulting rooms of medical social care of children polyclinics, feldsher obstetric stations, first-aid centers), level II--inter-municipal (departments of medical social monitoring in central district hospitals, medical institutions, clinical diagnostic centers) and level III--regional (the Republican center of medical social monitoring of children and adolescents). The immediate tasks necessary for effective functioning of system of medical social monitoring were determined. Within the framework of implementation of the pilot project the legal and normative legislative acts were developed to regulate functioning of regional model of three-level system of medical social care. The other documents necessary for effective functioning of this system were elaborated. The practical significance of this system is in the implementation of effective three-level model of medical social monitoring of children and adolescents supporting decrease of morbidity, mortality and "risk behaviors" suicidal included. The model is to prevent child neglect and homelessness and cruel treatment of children and adolescents.

  7. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Michael G.

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  8. Automated analysis of complex data

    NASA Technical Reports Server (NTRS)

    Saintamant, Robert; Cohen, Paul R.

    1994-01-01

    We have examined some of the issues involved in automating exploratory data analysis, in particular the tradeoff between control and opportunism. We have proposed an opportunistic planning solution for this tradeoff, and we have implemented a prototype, Igor, to test the approach. Our experience in developing Igor was surprisingly smooth. In contrast to earlier versions that relied on rule representation, it was straightforward to increment Igor's knowledge base without causing the search space to explode. The planning representation appears to be both general and powerful, with high level strategic knowledge provided by goals and plans, and the hooks for domain-specific knowledge are provided by monitors and focusing heuristics.

  9. Vaccine safety monitoring systems in developing countries: an example of the Vietnam model.

    PubMed

    Ali, Mohammad; Rath, Barbara; Thiem, Vu Dinh

    2015-01-01

    Only few health intervention programs have been as successful as vaccination programs with respect to preventing morbidity and mortality in developing countries. However, the success of a vaccination program is threatened by rumors and misunderstanding about the risks of vaccines. It is short-sighted to plan the introduction of vaccines into developing countries unless effective vaccine safety monitoring systems are in place. Such systems that track adverse events following immunization (AEFI) is currently lacking in most developing countries. Therefore, any rumor may affect the entire vaccination program. Public health authorities should implement the safety monitoring system of vaccines, and disseminate safety issues in a proactive mode. Effective safety surveillance systems should allow for the conduct of both traditional and alternative epidemiologic studies through the use of prospective data sets. The vaccine safety data link implemented in Vietnam in mid-2002 indicates that it is feasible to establish a vaccine safety monitoring system for the communication of vaccine safety in developing countries. The data link provided the investigators an opportunity to evaluate AEFI related to measles vaccine. Implementing such vaccine safety monitoring system is useful in all developing countries. The system should be able to make objective and clear communication regarding safety issues of vaccines, and the data should be reported to the public on a regular basis for maintaining their confidence in vaccination programs.

  10. Application of science-based restoration planning to a desert river system.

    PubMed

    Laub, Brian G; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  11. Application of Science-Based Restoration Planning to a Desert River System

    NASA Astrophysics Data System (ADS)

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  12. Application of science-based restoration planning to a desert river system

    USGS Publications Warehouse

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-01-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  13. Hungry Horse Mitigation; Flathead Lake, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2005-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.« less

  14. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  15. Hungry Horse Mitigation; Flathead Lake, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2006-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  16. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  17. Demographic monitoring of wild muriqui populations: Criteria for defining priority areas and monitoring intensity.

    PubMed

    Strier, Karen B; Possamai, Carla B; Tabacow, Fernanda P; Pissinatti, Alcides; Lanna, Andre M; Rodrigues de Melo, Fabiano; Moreira, Leandro; Talebi, Maurício; Breves, Paula; Mendes, Sérgio L; Jerusalinsky, Leandro

    2017-01-01

    Demographic data are essential to assessments of the status of endangered species. However, establishing an integrated monitoring program to obtain useful data on contemporary and future population trends requires both the identification of priority areas and populations and realistic evaluations of the kinds of data that can be obtained under different monitoring regimes. We analyzed all known populations of a critically endangered primate, the muriqui (genus: Brachyteles) using population size, genetic uniqueness, geographic importance (including potential importance in corridor programs) and implementability scores to define monitoring priorities. Our analyses revealed nine priority populations for the northern muriqui (B. hypoxanthus) and nine for the southern muriqui (B. arachnoides). In addition, we employed knowledge of muriqui developmental and life history characteristics to define the minimum monitoring intensity needed to evaluate demographic trends along a continuum ranging from simple descriptive changes in population size to predictions of population changes derived from individual based life histories. Our study, stimulated by the Brazilian government's National Action Plan for the Conservation of Muriquis, is fundamental to meeting the conservation goals for this genus, and also provides a model for defining priorities and methods for the implementation of integrated demographic monitoring programs for other endangered and critically endangered species of primates.

  18. Planning a graduate programme in public health nutrition for experienced nutrition professionals.

    PubMed

    Fox, Ann; Beyers, Joanne

    2011-08-01

    Public health renewal in Canada has highlighted the need for development and expansion of the public health nutrition workforce, particularly in northern and rural communities. The purpose of the present paper is to describe the planning of a more accessible graduate programme for experienced nutrition professionals. The planning effort was challenged by a short timeframe between programme approval and implementation and required intense collaboration with stakeholders and students. The programme planning model developed by The Health Communication Unit (THCU) at the Centre for Health Promotion was used to guide the process. This six-step model was familiar to key stakeholders and involved pre-planning, conducting a situational assessment, establishing goals and objectives, developing strategies and outcome indicators, and monitoring feedback. Resource constraints, short timelines and debates around distance education options presented challenges that were overcome by conducting a thorough needs assessment, creating an advisory committee, engaging key stakeholders in the planning process, and building on existing resources. Extensive involvement of the first cohort of students in ongoing planning and evaluation was particularly helpful in informing the evolution of the programme. The THCU planning model provided a useful framework for stakeholder collaboration and for planning and implementing the new graduate programme in public health nutrition. Preliminary data suggest that graduates are benefiting from their educational experiences through career enhancement opportunities. The evaluation strategies built into the programme design will be useful in informing ongoing programme development.

  19. A Regional Approach to Wildlife Monitoring Related to Energy Exploration and Development in Colorado

    USGS Publications Warehouse

    Kotliar, Natasha B.; Bowen, Zachary H.; Ouren, Douglas S.; Farmer, Adrian H.

    2008-01-01

    The U.S. Bureau of Land Management (BLM) is currently developing a National Monitoring Strategy that will guide efforts to create an efficient and effective process for monitoring land health by BLM. To inform the ongoing development of the national strategy, BLM selected two States (Colorado, Alaska) to serve as focal areas on which to base a flexible framework for developing monitoring programs that evaluate wildlife responses to energy development. We developed a three-phase monitoring plan to serve as a template and applied it to the design of a monitoring program for the Colorado focal area (White River and Glenwood Springs Field Offices of the BLM). Phase I is a synthesis and assessment of current conditions that capitalizes on existing but under used data sources. A key component is the use of existing habitat and landscape models to evaluate the cumulative effects of surface disturbance. Phase II is the data collection process that uses information provided in Phase I to refine management objectives and provide a linkage to management decisions. The linkage is established through targeted monitoring, adaptive management, and research. Phase III establishes priorities and strategies for regional and national monitoring, and facilitates coordination among other land management agencies and organizations. The three phases are designed to be flexible and complementary. The monitoring plan guides an iterative process that is performed incrementally, beginning with the highest-priority species and management issues, while building on lessons learned and coordination among administrative levels. The activities associated with each phase can be repeated or updated as new information, data, or tools become available. This allows the development of a monitoring program that expands gradually and allows for rapid implementation. A demonstration application of the three-phase monitoring plan was conducted for a study area encompassing five BLM field offices in Colorado: White River, Glenwood Springs, Kremmling, Grand Junction, and Little Snake. The overall study area was selected to encompass the primary distribution of sagebrush and greater sage-grouse (Centrocercus urophasianus) in Colorado and to provide a larger context for evaluating priority management issues of the White River and Glenwood Springs Field Offices. Within the study area, we selected an additional scale of analysis: the Roan Plateau, an area of increased energy development. We focused our demonstration project on the primary objectives identified by the BLM and other stakeholders: (1) How do we evaluate the cumulative effects of energy development and mitigation activities on species of management interest or concern? (2) How can cumulative effects, including direct and indirect effects, be quantified relative to natural variation? (3) How can we implement compliance and effectiveness monitoring to determine whether lease stipulations are met and restoration/mitigation goals are achieved? We targeted greater sage-grouse because this species was identified as a monitoring priority for the White River Field Office. We also evaluated landscape-level indices to address fragmentation resulting from surface disturbance. The primary purpose of this exercise was to highlight the types of analyses and approaches that could be used to evaluate energy development in an application of the three-phase framework. We provide examples of Phase I products that can be used to guide the refinement of management objectives, development of adaptive management and research frameworks, and planning activities in Phase II. Finally, we report on the BLM's National Sage-Grouse Habitat Conservation Strategy as an example of Phase III activities. The development of an effective monitoring program is a daunting task, and will be difficult to implement by the BLM independently due to the current work load of staff. However, the scientific expertise and experience for developing cr

  20. Monitoring and evaluation of strategic change programme implementation-Lessons from a case analysis.

    PubMed

    Neumann, Jan; Robson, Andrew; Sloan, Diane

    2018-02-01

    This study considered the monitoring and evaluation of a large-scale and domestic and global strategic change programme implementation. It considers the necessary prerequisites to overcome challenges and barriers that prevent systematic and effective monitoring and evaluation to take place alongside its operationalisation. The work involves a case study based on a major industrial company from the energy sector. The change programme makes particular reference to changes in business models, business processes, organisation structures as well as Enterprise Resource Planning infrastructure. The case study focussed on the summative evaluation of the programme post-implementation. This assessment involved 25 semi-structured interviews with employees across a range of managerial strata capturing more than 65 roles within the change programme at both local and global levels. Data relating to their perception of evaluation effectiveness and shortcomings were analysed by means of template analysis. The study identifies responsibilities for executing an evaluation alongside various methods and tools that are appropriate, thereby focussing on the "Who" (roles, responsibility for particular activities) and "How" (methods and tools) rather than "What" to monitor and evaluate. The findings are presented generically so they offer new insights and transferability for practitioners involved in managing strategic change and its associated evaluation. Copyright © 2017 Elsevier Ltd. All rights reserved.

  1. 77 FR 45320 - Approval and Promulgation of Implementation Plans; Mississippi; 110(a)(2)(G) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-31

    ...'' system, which means EPA will not know your identity or contact information unless you provide it in the... address basic SIP requirements, including emissions inventories, monitoring, and modeling to assure... for the 1997 PM 2.5 NAAQS by October 3, 2008. On July 6, 2011, WildEarth Guardians and Sierra Club...

  2. 77 FR 43018 - Partial Approval and Partial Disapproval of Air Quality Implementation Plans for Florida...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... be CBI or otherwise protected. The www.regulations.gov Web site is an ``anonymous access'' system... requirements, including emissions inventories, monitoring, and modeling to assure attainment and maintenance of... the CAA. See 42 U.S.C. 7410(a)(1). On July 6, 2011, WildEarth Guardians and Sierra Club filed an...

  3. 77 FR 35909 - Approval and Promulgation of Implementation Plans; Georgia; 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ...'' system, which means EPA will not know your identity or contact information unless you provide it in the... address basic SIP requirements, including emissions inventories, monitoring, and modeling to assure... PM 2.5 NAAQS by October 3, 2008. On July 6, 2011, WildEarth Guardians and Sierra Club filed an...

  4. 77 FR 38239 - Partial Approval and Disapproval of Air Quality Implementation Plans; Arizona; Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... anonymous access system, and EPA will not know your identity or contact information unless you provide it in... control measures. Section 110(a)(2)(B): Ambient air quality monitoring/data system. Section 110(a)(2)(C... significant deterioration (PSD) and visibility protection. Section 110(a)(2)(K): Air quality modeling and...

  5. Are alternative investments the right approach for your organization?

    PubMed

    French, Charles J; Dodd, Thomas H

    2010-04-01

    The decision by a healthcare provider to implement and monitor an alternative investment program requires careful consideration and planning. There are several things an organization should do when making this decision: Begin slowly. Consider access and liquidity. Don't force the investment to fill a target allocation. View an alternative investment as an opportunity investment."

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    PAQUETTE,D.E.; BENNETT,D.B.; DORSCH,W.R.

    THE DEPARTMENT OF ENERGY ORDER 5400.1, GENERAL ENVIRONMENTAL PROTECTION PROGRAM, REQUIRES THE DEVELOPMENT AND IMPLEMENTATION OF A GROUNDWATER PROTECTION PROGRAM. THE BNL GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION PROVIDES AN OVERVIEW OF HOW THE LABORATORY ENSURES THAT PLANS FOR GROUNDWATER PROTECTION, MONITORING, AND RESTORATION ARE FULLY DEFINED, INTEGRATED, AND MANAGED IN A COST EFFECTIVE MANNER THAT IS CONSISTENT WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

  7. Transport jet aircraft noise abatement in foreign countries: Growth, structure, impact. Volume 1: Europe, July 1980

    NASA Technical Reports Server (NTRS)

    Spencer, F. A.

    1980-01-01

    The development and implementation of aircraft noise control regulations in various European states are described. The countries include the United Kingdom, France, Switzerland, Federal Republic of Germany, Sweden, Denmark, and the Netherlands. Topics discussed include noise monitoring, airport curfews, land use planning, and the government structure for noise regulation.

  8. 77 FR 56775 - Approval and Promulgation of Implementation Plans; California; Determinations of Attainment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... its Technical System Audit of the CARB PQAO (conducted during Summer 2007), that the combined ambient... findings of EPA's Summer 2007 Technical System Audit of CARB's ambient air monitoring program). \\15\\ See, e... through www.regulations.gov or email. www.regulations.gov is an ``anonymous access'' system, and EPA will...

  9. 76 FR 49303 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Rules Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... design requirements for the monitoring systems. The revised CMS rules also delineate the recordkeeping..., [Insert page number where the document begins]. 7017.1140 CEMS design 03/01/99 08/10/11, [Insert page...]. 7017.1190 COMS design 03/01/99 08/10/11, [Insert page requirements. number where the document begins...

  10. 77 FR 73575 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Redesignation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ...) and Cross State Air Pollution Rule (CSAPR or the Transport Rule) On May 12, 2005, EPA published CAIR...) for the purpose of reducing SO 2 and NO X emissions. The monitoring data used to demonstrate the Area... Source Review (NSR) permit programs; Provisions for air pollution modeling; and Provisions for public and...

  11. 76 FR 17599 - Approval and Promulgation of Implementation Plans; State of Kansas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-30

    ... strategies to reduce air pollution. KDHE submits a 5-Year Ambient Air Monitoring Network Assessment to EPA... control of air pollution with the Secretary of Health and Environment (``Secretary''). The Secretary in... pollution is defined in KSA Section 65-3002(c) as the presence in the outdoor atmosphere of one or more air...

  12. 77 FR 3220 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-23

    ... of Environmental Protection performed a missing data analysis for this site in accordance with the regulatory requirements of 40 CFR part 50, Appendix I. The Massachusetts missing data analysis used a combination of meteorology and air quality data for ozone monitors near the Adams site for the missing days to...

  13. 76 FR 77739 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts and New Hampshire...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... in EPA's Air Quality System (AQS) database. To account for missing data, the procedures found in... determination is based upon complete, certified, quality-assured ambient air quality monitoring data for the... proposing? II. What is the background for this proposed action? III. What is EPA's analysis of data for...

  14. Treatment Fidelity: Special Educators' Perceptions of Measures Used to Monitor the Implementation of Behavior Intervention Plans

    ERIC Educational Resources Information Center

    Thorne, Jennifer

    2012-01-01

    The Individuals with Disabilities Education Improvement Act of 2004 requires empirically based interventions to be used when treating chronic problem behaviors. The fundamental part of behavior modification is the ability to demonstrate that behavior change occurred due to the intervention. This can only be accomplished when the intervention is…

  15. The Nature-Computer Camp. Final Evaluation Report, 1984-1985. E.C.I.A. Chapter 2.

    ERIC Educational Resources Information Center

    District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.

    This report presents a description and evaluation of the Nature-Computer Camp (NCC), an environmental and computer science program designed for sixth grade students in the District of Columbia public schools. Inputs, processes and outcomes based on a Planning, Monitoring and Implementing (PMI) Evaluation Model are reviewed for each of the four…

  16. Nature-Computer Camp. Final Evaluation Report. E.C.I.A. Chapter 2.

    ERIC Educational Resources Information Center

    District of Columbia Public Schools, Washington, DC. Div. of Quality Assurance.

    This report presents a description and evaluation of the Nature-Computer Camp (NCC), an environmental and computer science program designed for sixth grade students in the District of Columbia public schools. Inputs, processes and outcomes based on a Planning, Monitoring and Implementing (PMI) Evaluation Model are reviewed for each of the four…

  17. 77 FR 43032 - Approval and Promulgation of Implementation Plans; Mississippi: New Source Review-Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ...'' particles (e.g., sulfate and nitrate) form in the atmosphere as a result of various chemical reactions. The... chemical reactions to form secondary PM). In most areas of the country, PM 2.5 precursor emissions are... determinations for PM 2.5 NAAQS. These requirements address air quality modeling and monitoring provisions for...

  18. 77 FR 21690 - Approval and Promulgation of Air Quality Implementation Plan for 1997 8-Hour Ozone Standard; Arizona

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... and emissions input data preparation, model performance evaluation, interpreting modeling results, and... standard based on ambient ozone monitoring data for the 2006- 2008 period. EPA has not yet acted on this... ppm) and years thereafter were at or below the standard. See EPA Air Quality System (AQS) data...

  19. 76 FR 14606 - Approval and Promulgation of Implementation Plans; South Carolina; 110(a)(1) and (2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... reward system. As discussed above, Regulation 61-62.3, Air Pollution Episodes, requires that DHEC notify... ``anonymous access'' system, which means EPA will not know your identity or contact information unless you... air quality monitoring/data system. 110(a)(2)(C): Program for enforcement of control measures.\\2\\ \\2...

  20. 76 FR 81727 - Approval and Promulgation of Implementation Plans; Oklahoma; Federal Implementation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ...EPA is partially approving and partially disapproving a revision to the Oklahoma State Implementation Plan (SIP) submitted by the State of Oklahoma through the Oklahoma Department of Environmental Quality on February 19, 2010, intended to address the regional haze requirements of the Clean Air Act (CAA). In addition, EPA is partially approving and partially disapproving a portion of a revision to the Oklahoma SIP submitted by the State of Oklahoma on May 10, 2007 and supplemented on December 10, 2007 to address the requirements of CAA section 110(a)(2)(D)(i)(II) as it applies to visibility for the 1997 8- hour ozone and 1997 fine particulate matter National Ambient Air Quality Standards. This CAA requirement is intended to prevent emissions from one state from interfering with the visibility programs in another state. EPA is approving certain core elements of the SIP including Oklahoma's: determination of baseline and natural visibility conditions; coordinating regional haze and reasonably attributable visibility impairment; monitoring strategy and other implementation requirements; coordination with states and Federal Land Managers; and a number of NOX, SO2, and PM BART determinations. EPA is finding that Oklahoma's regional haze SIP did not address the sulfur dioxide Best Available Retrofit Technology requirements for six units in Oklahoma in accordance with the Regional Haze requirements, or the requirement to prevent interference with other states' visibility programs. EPA is promulgating a Federal Implementation Plan to address these deficiencies by requiring emissions to be reduced at these six units. This action is being taken under section 110 and part C of the CAA.

  1. Near real-time analysis of tritium in treated water

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Skibo, A.

    The Tokyo Electric Power Company (TEPCO) is managing large quantities of treated water at the Fukushima Daiichi Nuclear Power Station. Moving forward, TEPCO will be discharging from the site clean water that meets agreed criteria. As part of agreements with stakeholders, TEPCO is planning to carefully monitor the water prior to discharge to assure compliance. The objective of this proposal is to support implementation of an on-line “real-time” (continuous or semi-continuous) tritium monitor that will reliably measure levels down to the agreed target 1500 Becquerels per liter (Bq/L).

  2. 40 CFR 74.61 - Monitoring plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this chapter...

  3. The strategy for improving water-quality monitoring in the United States; final report of the Intergovernmental Task Force on Monitoring Water Quality; technical appendices

    USGS Publications Warehouse

    ,

    1995-01-01

    The Intergovernmental Task Force on Monitoring Water Quality (ITFM) prepared this report in collaboration with representatives of all levels of government and the private sector. The report recommends a strategy for nationwide water-quality monitoring and technical monitoring improvements to support sound water-quality decisionmaking. The strategy is intended to achieve a better return on public and private investments in monitoring, environmental protection, and natural resources management. It is also designed to expand the base of information useful to a variety of users at multiple geographic scales. Institutional and technical changes are needed to improve water-quality monitoring and to meet the full range of monitoring requirements. Monitoring must be incorporated as a critical element of program planning, implementation, and evaluation. The strategy includes recommendations in many key elements, such as the development of goal-oriented monitoring and indicators, institutional collaboration, and methods comparability. Initial actions have been taken to implement the strategy. Several Federal agencies have jointly purchased and shared remotely sensed land-cover information needed for water assessment. Major agency data systems are using common data-element names and reference tables that will ensure easy sharing of data. A number of States have held meetings with collectors of water information to initiate statewide monitoring strategies. New monitoring guidance has been developed for Federal water-quality grants to States. Many State offices have changed monitoring programs to place emphasis on priority watersheds and to improve assessment of water quality. As the competition increases for adequate supplies of clean water, concerns about public health and the environment escalate, and more demands are placed on the water information infrastructure. To meet these demands, the collaborative approach has already produced benefits, which will continue to grow as the recommendations are implemented

  4. Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Taoran, E-mail: taoran.li.duke@gmail.com; Wu, Qiuwen; Yang, Yun

    Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system wasmore » designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Results: Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system’s ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. Conclusions: The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.« less

  5. Quality assurance for online adapted treatment plans: benchmarking and delivery monitoring simulation.

    PubMed

    Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q

    2015-01-01

    An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system's performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Online adapted plans were found to have similar delivery accuracy in comparison to clinical IMRT plans when validated with portal dosimetry IMRT QA. FEMs for the simulated deliveries with intentional MLC errors exhibited distinct patterns for different MLC error magnitudes and directions, indicating that the proposed delivery monitoring system is highly specific in detecting the source of errors. Implementing the proposed QA system for online adapted plans revealed excellent delivery accuracy: over 99% of leaf position differences were within 0.5 mm, and >99% of pixels in the FEMs had fluence errors within 0.5 MU. Patterns present in the FEMs and MLC control point analysis for actual patient cases agreed with the error pattern analysis results, further validating the system's ability to reveal and differentiate MLC deviations. Calculation of the fluence map based on the DMI was performed within 2 ms after receiving each DMI input. The proposed online delivery monitoring system requires minimal additional resources and time commitment to the current clinical workflow while still maintaining high sensitivity to leaf position errors and specificity to error types. The presented online delivery monitoring system therefore represents a promising QA system candidate for online adaptive radiation therapy.

  6. Potential of integrated continuous surveys and quality management to support monitoring, evaluation, and the scale-up of health interventions in developing countries.

    PubMed

    Rowe, Alexander K

    2009-06-01

    Well-funded initiatives are challenging developing countries to increase health intervention coverage and show impact. Despite substantial resources, however, major obstacles include weak health systems, a lack of reasonably accurate monitoring data, and inadequate use of data for managing programs. This report discusses how integrated continuous surveys and quality management (I-Q), which are well-recognized approaches in wealthy countries, could support intervention scale-up, monitoring and evaluation, quality control for commodities, capacity building, and implementation research in low-resource settings. Integrated continuous surveys are similar to existing national cross-sectional surveys of households and health facilities, except data are collected over several years by permanent teams, and most results are reported monthly at the national, province, and district levels. Quality management involves conceptualizing work as processes, involving all workers in quality improvement, monitoring quality, and teams that improve quality with "plan-do-study-act" cycles. Implementing and evaluating I-Q in a low-income country would provide critical information on the value of this approach.

  7. Process evaluation of discharge planning implementation in healthcare using normalization process theory.

    PubMed

    Nordmark, Sofi; Zingmark, Karin; Lindberg, Inger

    2016-04-27

    Discharge planning is a care process that aims to secure the transfer of care for the patient at transition from home to the hospital and back home. Information exchange and collaboration between care providers are essential, but deficits are common. A wide range of initiatives to improve the discharge planning process have been developed and implemented for the past three decades. However, there are still high rates of reported medical errors and adverse events related to failures in the discharge planning. Using theoretical frameworks such as Normalization Process Theory (NPT) can support evaluations of complex interventions and processes in healthcare. The aim of this study was to explore the embedding and integration of the DPP from the perspective of registered nurses, district nurses and homecare organizers. The study design was explorative, using the NPT as a framework to explore the embedding and integration of the DPP. Data consisted of written documentation from; workshops with staff, registered adverse events and system failures, web based survey and individual interviews with staff. Using the NPT as a framework to explore the embedding and integration of discharge planning after 10 years in use showed that the staff had reached a consensus of opinion of what the process was (coherence) and how they evaluated the process (reflexive monitoring). However, they had not reached a consensus of opinion of who performed the process (cognitive participation) and how it was performed (collective action). This could be interpreted as the process had not become normalized in daily practice. The result shows necessity to observe the implementation of old practices to better understand the needs of new ones before developing and implementing new practices or supportive tools within healthcare to reach the aim of development and to accomplish sustainable implementation. The NPT offers a generalizable framework for analysis, which can explain and shape the implementation process of old practices, before further development of new practices or supportive tools.

  8. State Wildlife Action Plans as Tools for Adapting to a Continuously Changing Climate

    NASA Astrophysics Data System (ADS)

    Metivier, D. W.; Yocum, H.; Ray, A. J.

    2015-12-01

    Public land management plans are potentially powerful policies for building sustainability and adaptive capacity. Land managers are recognizing the need to respond to numerous climate change impacts on natural and human systems. For the first time, in 2015, the federal government required each state to incorporate climate change into their State Wildlife Action Plans (SWAP) as a condition for funding. As important land management tools, SWAPs have the potential to guide state agencies in shaping and implementing practices for climate change adaptation. Intended to be revised every ten years, SWAPs can change as conditions and understanding of climate change evolves. This study asks what practices are states using to integrate climate change, and how does this vary between states? To answer this question, we conducted a broad analysis among seven states (CO, MT, NE, ND, SD, UT, WY) and a more in-depth analysis of four states (CO, ND, SD, WY). We use seven key factors that represent best practices for incorporating climate change identified in the literature. These best practices are species prioritization, key habitats, threats, monitoring, partnerships and participation, identification of management options, and implementation of management options. The in-depth analysis focuses on how states are using climate change information for specific habitats addressed in the plans. We find that states are integrating climate change in many different ways, showing varying degrees of sophistication and preparedness. We summarize different practices and highlight opportunities to improve the effectiveness of plans through: communication tools across state lines and stakeholders, explicit targeting of key habitats, enforcement and monitoring progress and success, and conducting vulnerability analyses that incorporate topics beyond climate and include other drivers, trajectories, and implications of historic and future land-use change.

  9. Effects-based strategy development through center of gravity and target system analysis

    NASA Astrophysics Data System (ADS)

    White, Christopher M.; Prendergast, Michael; Pioch, Nicholas; Jones, Eric K.; Graham, Stephen

    2003-09-01

    This paper describes an approach to effects-based planning in which a strategic-theater-level mission is refined into operational-level and ultimately tactical-level tasks and desired effects, informed by models of the expected enemy response at each level of abstraction. We describe a strategy development system that implements this approach and supports human-in-the-loop development of an effects-based plan. This system consists of plan authoring tools tightly integrated with a suite of center of gravity (COG) and target system analysis tools. A human planner employs the plan authoring tools to develop a hierarchy of tasks and desired effects. Upon invocation, the target system analysis tools use reduced-order models of enemy centers of gravity to select appropriate target set options for the achievement of desired effects, together with associated indicators for each option. The COG analysis tools also provide explicit models of the causal mechanisms linking tasks and desired effects to one another, and suggest appropriate observable indicators to guide ISR planning, execution monitoring, and campaign assessment. We are currently implementing the system described here as part of the AFRL-sponsored Effects Based Operations program.

  10. 2015 Site Environmental Report Fernald Preserve

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hertel, Bill; Hooten, Gwen

    The Fernald Preserve 2015 Site Environmental Report provides stakeholders with the results from the Fernald, Ohio, Site’s environmental monitoring programs for 2015; a summary of the U.S. Department of Energy’s (DOE’s) activities conducted onsite; and a summary of the Fernald Preserve’s compliance with the various environmental regulations, compliance agreements, and DOE policies that govern site activities. This report has been prepared in accordance with the “Integrated Environmental Monitoring Plan,” which is Attachment D of the Comprehensive Legacy Management and Institutional Controls Plan (LMICP) (DOE 2016). Remediation of the Fernald Preserve has been successfully completed with the exception of the groundwater.more » During 2015, activities at the Fernald Preserve included: environmental monitoring activities related to direct radiation, groundwater, and surface water; ecological restoration monitoring and maintenance as well as inspections, care, and monitoring of the site and the OSDF to ensure that provisions of the LMICP are fully implemented; OSDF leak detection monitoring and collection, monitoring, and treatment of leachate from the OSDF; extraction, monitoring, and treatment of contaminated groundwater from the Great Miami Aquifer (Operable Unit 5); ongoing operation of the Fernald Preserve Visitors Center, associated outreach, and educational activities; and monitoring as specified in the site’s National Pollutant Discharge Elimination System (NPDES) permit. Environmental monitoring programs were developed to ensure that the remedy remains protective of the environment. The requirements of these programs are described in detail in the LMICP and reported in this Site Environmental Report.« less

  11. Implementation of an automated system for monitoring adherence to hemodialysis treatment: a report of seven years of experience.

    PubMed

    Bellazzi, Riccardo; Sacchi, Lucia; Caffi, Ezio; de Vincenzi, Amedeo; Nai, Maurizio; Manicone, Francesco; Larizza, Cristiana; Bellazzi, Roberto

    2012-05-01

    In this paper we present the clinical deployment and evaluation of a computerized system, EMOSTAT, aimed at improving the quality of hemodialysis sessions. EMOSTAT automatically imports data from the hemodialysis monitoring software tools and analyzes the delivered treatment looking at six clinically relevant parameters. Failures-to-adhere (FtAs) to the planned treatment are detected and reported to the care-givers. EMOSTAT has been used for more than seven years in the management of a dialysis service located in Mede, Italy. A total of 72 patients were monitored and 21251 dialyses were collected. Data analysis is performed on the periods 2002-2005 and 2005-2008, corresponding to two different software releases. The system had been exploited into everyday clinical practice for the entire considered period. The number of FtAs significantly decreased along the first period: the bulk blood flow FtAs decreased after the introduction of the system. Hemodialysis sessions lasted longer in the second period. Co-occurring FtAs, highlighting the presence of complex FtAs patterns, were also detected. EMOSTAT provides an effective way to re-focus the attention of the dialysis department on the treatment plan and on its implementation. The automatic data collection and the design philosophy of EMOSTAT allowed the routine use of the system. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  12. Process, policy, and implementation of pool-wide drawdowns on the Upper Mississippi River: a promising approach for ecological restoration of large impounded rivers

    USGS Publications Warehouse

    Kenow, Kevin P.; Gretchen Benjamin,; Tim Schlagenhaft,; Ruth Nissen,; Mary Stefanski,; Gary Wege,; Scott A. Jutila,; Newton, Teresa J.

    2016-01-01

    The Upper Mississippi River (UMR) has been developed and subsequently managed for commercial navigation by the U.S. Army Corps of Engineers (USACE). The navigation pools created by a series of lock and dams initially provided a complex of aquatic habitats that supported a variety of fish and wildlife. However, biological productivity declined as the pools aged. The River Resources Forum, an advisory body to the St. Paul District of the USACE, established a multiagency Water Level Management Task Force (WLMTF) to evaluate the potential of water level management to improve ecological function and restore the distribution and abundance of fish and wildlife habitat. The WLMTF identified several water level management options and concluded that summer growing season drawdowns at the pool scale offered the greatest potential to provide habitat benefits over a large area. Here we summarize the process followed to plan and implement pool-wide drawdowns on the UMR, including involvement of stakeholders in decision making, addressing requirements to modify reservoir operating plans, development and evaluation of drawdown alternatives, pool selection, establishment of a monitoring plan, interagency coordination, and a public information campaign. Three pool-wide drawdowns were implemented within the St. Paul District and deemed successful in providing ecological benefits without adversely affecting commercial navigation and recreational use of the pools. Insights are provided based on more than 17 years of experience in planning and implementing drawdowns on the UMR. 

  13. Remedial Action Report for Operable Units 6-05 and 10-04, Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. P. Wells

    2007-08-15

    This Phase III remedial action report addresses the remediation of lead-contaminated soils found at the Security Training Facility STF-02 Gun Range at the Idaho National Laboratory Site. Phase I, consisting of developing and implementing institutional controls at Operble Unit 10-04 sites and developing and implementing Idaho National Laboratory Site-wide plans for both institutional controls and ecological monitoring, was addressed in a previous report. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase IV will remediate hazards from unexploded ordnance.

  14. A Survey of Restraint Methods for the Safe Transport of Children in Ground Ambulances.

    PubMed

    Woods, Rashida H; Shah, Manish; Doughty, Cara; Gilchrest, Anthony

    2018-03-01

    The National Highway Traffic Safety Administration (NHTSA) released draft recommendations in 2010 on the safe transport of children in ground ambulances. The purpose of this study was to assess awareness of these guidelines among emergency medical service (EMS) agencies and to identify implementation barriers. We conducted a cross-sectional, anonymous online survey of 911-responding, ground transport EMS agencies in Texas. Demographics, modes of transport based on case scenarios, and barriers to implementation were assessed. Of 62 eligible EMS agencies that took the survey, 35.7% were aware of the NHTSA guidelines, 62.5% agreed they would improve safety, and 41.1% planned to implement them. Seventy-five percent of EMS agencies used the ideal or acceptable alternative to transport children requiring continuous monitoring, and 69.5% chose ideal or acceptable alternatives for children requiring spinal immobilization. The ideal or acceptable alternative was not chosen for children who were not injured or ill (93.2%), ill or injured but not requiring continuous monitoring (53.3%), and situations when multiple patients required transport (57.6%). The main requirements for implementation were provider education, ambulance interior modifications, new guidelines in the EMS agency, and purchase of new equipment. Few EMS agencies are aware of the NHTSA guidelines on safe transport of children in ground ambulances. Although most agencies appropriately transport children who require monitoring, interventions, or spinal immobilization, they use inappropriate means to transport children in situations with multiple patients, lack of injury or illness, or lack of need for monitoring.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC; Environmental Compliance Department Environment, Safety, and Health Division Y-12 National Security Complex

    This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of BWXT Y-12, L.L.C. (hereafter referenced as BWXT), the Y-12 management and operations (M&O) contractor for DOE. This GWPP management plan addresses the requirements of DOE Order 450.1 (BWXT Y12 S/RID) regarding the implementation of a site-wide approach for groundwater protection at each DOE facility. Additionally, this plan is a ''living'' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less

  16. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less

  17. Hood River Fish Habitat Project; Confederated Tribes of the Warm Springs Reservation of Oregon, Annual Report 2002-2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vaivoda, Alexis

    2004-02-01

    This report summarizes the project implementation and monitoring of all habitat activities in the Hood River basin that occurred over the October 1, 2002 to September 30, 2003 period (FY 03). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 03. A description of the progress during FY 03 and reasoning for deviation from the original tasks and timeline are provided. OBJECTIVE 1 - Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administrative oversight and coordination of the habitat statement of work, budget, subcontracts,more » personnel, implementation, and monitoring was provided. OBJECTIVE 2 - Continue to coordinate, implement, and revise, as needed, the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document was utilized for many purposes including: drafting the Watershed Action Plan (Coccoli, 2002), ranking projects for funding, and prioritizing projects to target in the future. This document has been reviewed by many, including stakeholders, agencies, and interested parties. The Hood River Watershed Group Coordinator and author of the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan, Holly Coccoli, has updated and revised the plan. Changes will be reflected in the Hood River Subbasin Plan, and after submission of the Subbasin Plan, a formally revised version of the Monitoring Plan will be put out for review. This will more specifically address changes in the Hood River subbasin since 2000, and reflect changes to fish habitat and needs in the Hood River subbasin regarding monitoring. OBJECTIVE 3 - Evaluate and monitor the habitat, accessibility, and presence of winter steelhead, coho salmon, and resident trout upstream of the Middle Fork Irrigation District water sources on Evans Creek. Through this project, BPA funded the Middle Fork Irrigation District (MFID) a total of $194,000 in FY 03 for the Glacier Ditch- Evans Creek project. BPA funds accounted for approximately 30% of the project while the remaining 70% was cost-shared by the MFID, the US Forest Service, and the Oregon Watershed Enhancement Board. The MFID operated irrigation diversions on Evans Creek (Hutson pond RM 4.0 and the Evans Creek diversion RM 5.5), a tributary to the East Fork Hood River. Both diversions had inadequate upstream fish passage, and utilized Evans Creek to transport Eliot Branch water to distribute irrigation water lower in the basin. This project consisted of: piping a portion of the Glacier ditch to create a pressurized irrigation pipeline system, piping the Hutson extension, removing the culvert on Evans Creek near the Glacier ditch, removing the culvert above the Hutson pond, revegetating the disturbed areas, and providing adequate and approved fish passage on Evans Creek. Prior to any work, Brian Connors with MFID completed a NEPA checklist. Some of the key regulatory points of this project included wetland delineations, a cultural resources survey, and consultations with NOAA Fisheries, U.S. Fish and Wildlife, Oregon Department of Fish and Wildlife (ODFW), and the U.S. Army Corps of Engineers. This project will eliminate the overflow of silty water into Evans Creek and West Fork Evans Creek. Upon completion of this project, access to 2.5 miles of winter steelhead, coho salmon, and resident trout habitat will be restored. Elimination of the interbasin transfer of water will discontinue the conveyance of silty Eliot Branch water into clear East Fork tributaries. Additionally, less water taken from Coe Branch, Eliot Branch, and Laurance Lake which will benefit listed steelhead and bull trout. The Glacier Ditch provided irrigation water from the Eliot Branch to upper valley orchards and agriculture for more than 100 years. The Glacier Ditch served approximately 1,438 acres with 18 cfs of water. The Glacier Ditch portion of this project consisted of 12,000 feet of 24-inch HDPE pipe, and was installed in February and March of 2003. Most of this pipeline was installed in or along the Glacier Ditch. The pipe crossed Evans Creek near the concrete diversion. A wooddecked steel bridge will be built during the summer of 2004, to replace the culvert crossing. The bridge will enable Evans Creek to be restored to a natural flow pattern. The pond will be left to equalize with the hydrology of the area. The Hutson Extension phase of this project consisted of 4,330 feet of 48-inch HDPE pipe. This part of the project eliminated the need for the existing diversion and fish ladder at Hutson Pond. This pipe was installed during April 2003 and lies beneath the Evans Creek and West Fork Evans Creek stream channels (Figure 1). One culvert was removed at the Hutson Pond on Evans Creek (RM 3.3).« less

  18. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Lofy, Peter T.

    2003-03-01

    This is the third annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2000: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCP). (2) Plan for recovery of endemic summer steelhead populations in Catherinemore » Creek and the upper Grande Ronde River. (3) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (4) Collect summer steelhead. (5) Collect adult endemic spring chinook salmon broodstock. (6) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (7) Document accomplishments and needs to permitters, comanagers, and funding agency. (8) Communicate project results to the scientific community. (9) Plan detailed GRESCP Monitoring and Evaluation for future years. (10) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations and incidentally-caught summer steelhead and bull trout. (11) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (12) Monitor water quality at facilities. (13) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program.« less

  19. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2003 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  20. John Day Watershed Restoration Projects, annual report 2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Linda

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  1. Adjustably Autonomous Multi-agent Plan Execution with an Internal Spacecraft Free-Flying Robot Prototype

    NASA Technical Reports Server (NTRS)

    Dorais, Gregory A.; Nicewarner, Keith

    2006-01-01

    We present an multi-agent model-based autonomy architecture with monitoring, planning, diagnosis, and execution elements. We discuss an internal spacecraft free-flying robot prototype controlled by an implementation of this architecture and a ground test facility used for development. In addition, we discuss a simplified environment control life support system for the spacecraft domain also controlled by an implementation of this architecture. We discuss adjustable autonomy and how it applies to this architecture. We describe an interface that provides the user situation awareness of both autonomous systems and enables the user to dynamically edit the plans prior to and during execution as well as control these agents at various levels of autonomy. This interface also permits the agents to query the user or request the user to perform tasks to help achieve the commanded goals. We conclude by describing a scenario where these two agents and a human interact to cooperatively detect, diagnose and recover from a simulated spacecraft fault.

  2. Country actions to meet UN commitments on non-communicable diseases: a stepwise approach.

    PubMed

    Bonita, Ruth; Magnusson, Roger; Bovet, Pascal; Zhao, Dong; Malta, Deborah C; Geneau, Robert; Suh, Il; Thankappan, Kavumpurathu Raman; McKee, Martin; Hospedales, James; de Courten, Maximilian; Capewell, Simon; Beaglehole, Robert

    2013-02-16

    Strong leadership from heads of state is needed to meet national commitments to the UN political declaration on non-communicable diseases (NCDs) and to achieve the goal of a 25% reduction in premature NCD mortality by 2025 (the 25 by 25 goal). A simple, phased, national response to the political declaration is suggested, with three key steps: planning, implementation, and accountability. Planning entails mobilisation of a multisectoral response to develop and support the national action plan, and to build human, financial, and regulatory capacity for change. Implementation of a few priority and feasible cost-effective interventions for the prevention and treatment of NCDs will achieve the 25 by 25 goal and will need only few additional financial resources. Accountability incorporates three dimensions: monitoring of progress, reviewing of progress, and appropriate responses to accelerate progress. A national NCD commission or equivalent, which is independent of government, is needed to ensure that all relevant stakeholders are held accountable for the UN commitments to NCDs. Copyright © 2013 Elsevier Ltd. All rights reserved.

  3. Some recent advances of intelligent health monitoring systems for civil infrastructures in HIT

    NASA Astrophysics Data System (ADS)

    Ou, Jinping

    2005-06-01

    The intelligent health monitoring systems more and more become a technique for ensuring the health and safety of civil infrastructures and also an important approach for research of the damage accumulation or even disaster evolving characteristics of civil infrastructures, and attracts prodigious research interests and active development interests of scientists and engineers since a great number of civil infrastructures are planning and building each year in mainland China. In this paper, some recent advances on research, development nad implementation of intelligent health monitoring systems for civil infrastructuresin mainland China, especially in Harbin Institute of Technology (HIT), P.R.China. The main contents include smart sensors such as optical fiber Bragg grating (OFBG) and polivinyllidene fluoride (PVDF) sensors, fatigue life gauges, self-sensing mortar and carbon fiber reinforced polymer (CFRP), wireless sensor networks and their implementation in practical infrastructures such as offshore platform structures, hydraulic engineering structures, large span bridges and large space structures. Finally, the relative research projects supported by the national foundation agencies of China are briefly introduced.

  4. Geographic information system as country-level development and monitoring tool, Senegal example

    USGS Publications Warehouse

    Moore, Donald G.; Howard, Stephen M.; ,

    1990-01-01

    Geographic information systems (GIS) allow an investigator the capability to merge and analyze numerous types of country-level resource data. Hypothetical resource analysis applications in Senegal were conducted to illustrate the utility of a GIS for development planning and resource monitoring. Map and attribute data for soils, vegetation, population, infrastructure, and administrative units were merged to form a database within a GIS. Several models were implemented using a GIS to: analyze development potential for sustainable dryland agriculture; prioritize where agricultural development should occur based upon a regional food budget; and monitor dynamic events with remote sensing. The steps for implementing a GIS analysis are described and illustrated, and the use of a GIS for conducting an economic analysis is outlined. Using a GIS for analysis and display of results opens new methods of communication between resource scientists and decision makers. Analyses yielding country-wide map output and detailed statistical data for each level of administration provide the advantage of a single system that can serve a variety of users.

  5. Automatic vehicle monitoring systems study. Report of phase O. Volume 2: Problem definition and derivation of AVM system selection techniques

    NASA Technical Reports Server (NTRS)

    1976-01-01

    A set of planning guidelines is presented to help law enforcement agencies and vehicle fleet operators decide which automatic vehicle monitoring (AVM) system could best meet their performance requirements. Improvements in emergency response times and resultant cost benefits obtainable with various operational and planned AVM systems may be synthesized and simulated by means of special computer programs for model city parameters applicable to small, medium and large urban areas. Design characteristics of various AVM systems and the implementation requirements are illustrated and cost estimated for the vehicles, the fixed sites and the base equipments. Vehicle location accuracies for different RF links and polling intervals are analyzed. Actual applications and coverage data are tabulated for seven cities whose police departments actively cooperated in the study.

  6. Communication Patterns in the Perioperative Environment During Epic Electronic Health Record System Implementation.

    PubMed

    Friend, Tynan H; Jennings, Samantha J; Levine, Wilton C

    2017-02-01

    In April 2016, Massachusetts General Hospital (MGH) went live with the Epic electronic health records (EHR) system, replacing a variety of EHRs that previously existed in different departments throughout the hospital. At the time of implementation, the Vocera® Badge Communication System, a wireless hands-free communication device distributed to perioperative team members, had increased perioperative communication flow and efficiency. As a quality improvement effort to better understand communication patterns during an EHR go-live, we monitored our Vocera call volume and user volume before, during and after our go-live. We noticed that call volume and user volume significantly increased during our immediate go-live period and quickly returned to baseline levels. We also noticed that call volume increased during periods of unplanned EHR downtime long after our immediate go-live period. When planning the implementation of a new EHR, leadership must plan for and support this critical communication need at the time of the go-live and must also be aware of these needs during unplanned downtime.

  7. Governance and human resources for health.

    PubMed

    Dieleman, Marjolein; Hilhorst, Thea

    2011-11-24

    Despite an increase in efforts to address shortage and performance of Human Resources for Health (HRH), HRH problems continue to hamper quality service delivery. We believe that the influence of governance is undervalued in addressing the HRH crisis, both globally and at country level. This thematic series has aimed to expand the evidence base on the role of governance in addressing the HRH crisis. The six articles comprising the series present a range of experiences. The articles report on governance in relation to developing a joint vision, building adherence and strengthening accountability, and on governance with respect to planning, implementation, and monitoring. Other governance issues warrant attention as well, such as corruption and transparency in decision-making in HRH policies and strategies. Acknowledging and dealing with governance should be part and parcel of HRH planning and implementation. To date, few experiences have been shared on improving governance for HRH policy making and implementation, and many questions remain unanswered. There is an urgent need to document experiences and for mutual learning.

  8. Ensuring quality: a key consideration in scaling-up HIV-related point-of-care testing programs

    PubMed Central

    Fonjungo, Peter N.; Osmanov, Saladin; Kuritsky, Joel; Ndihokubwayo, Jean Bosco; Bachanas, Pam; Peeling, Rosanna W.; Timperi, Ralph; Fine, Glenn; Stevens, Wendy; Habiyambere, Vincent; Nkengasong, John N.

    2016-01-01

    Objective: The objective of the WHO/US President's Emergency Plan for AIDS Relief consultation was to discuss innovative strategies, offer guidance, and develop a comprehensive policy framework for implementing quality-assured HIV-related point-of-care testing (POCT). Methods: The consultation was attended by representatives from international agencies (WHO, UNICEF, UNITAID, Clinton Health Access Initiative), United States Agency for International Development, Centers for Disease Control and Prevention/President's Emergency Plan for AIDS Relief Cooperative Agreement Partners, and experts from more than 25 countries, including policy makers, clinicians, laboratory experts, and program implementers. Main outcomes: There was strong consensus among all participants that ensuring access to quality of POCT represents one of the key challenges for the success of HIV prevention, treatment, and care programs. The following four strategies were recommended: implement a newly proposed concept of a sustainable quality assurance cycle that includes careful planning; definition of goals and targets; timely implementation; continuous monitoring; improvements and adjustments, where necessary; and a detailed evaluation; the importance of supporting a cadre of workers [e.g. volunteer quality corps (Q-Corps)] with the role to ensure that the quality assurance cycle is followed and sustained; implementation of the new strategy should be seen as a step-wise process, supported by development of appropriate policies and tools; and joint partnership under the leadership of the ministries of health to ensure sustainability of implementing novel approaches. Conclusion: The outcomes of this consultation have been well received by program implementers in the field. The recommendations also laid the groundwork for developing key policy and quality documents for the implementation of HIV-related POCT. PMID:26807969

  9. Amphibian research and monitoring initiative: Concepts and implementation

    USGS Publications Warehouse

    Corn, P.S.; Adams, M.J.; Battaglin, W.A.; Gallant, Alisa L.; James, D.L.; Knutson, M.; Langtimm, C.A.; Sauer, J.R.

    2005-01-01

    This report provides the basis for discussion and subsequent articulation of a national plan for the Amphibian Research and Monitoring Initiative (ARMI). The authors were members of a task force formed from within the U.S. Geological Survey (USGS) that included scientists with expertise in biology, cartography, hydrology, and statistics. The assignment of the task force was to extend work begun by the National Amphibian Leadership Group. This group, composed of senior USGS scientists, managers, and external authorities, met in Gainesville, Florida, in February 20001. The product of this meeting was a document outlining the framework for a national program to monitor amphibian populations and to conduct research into the causes of declines.

  10. 77 FR 72287 - Approval and Promulgation of Implementation Plans; Florida; 110(a)(2)(D)(i)(II) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ....gov Web site is an ``anonymous access'' system, which means EPA will not know your identity or contact... inventories, monitoring, and modeling to assure attainment and maintenance of the NAAQS. States were required... infrastructure elements for the 1997 PM 2.5 NAAQS by October 3, 2008. On July 6, 2011, WildEarth Guardians and...

  11. 77 FR 34306 - Approval and Promulgation of Implementation Plans; Tennessee; 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ...'' system, which means EPA will not know your identity or contact information unless you provide it in the..., including emissions inventories, monitoring, and modeling to assure attainment and maintenance of the NAAQS... elements for the 1997 PM 2.5 NAAQS by October 3, 2008. On July 6, 2011, WildEarth Guardians and Sierra Club...

  12. Central Control and Automation Systems: A Management and Procurement Handbook. Second Edition.

    ERIC Educational Resources Information Center

    Association of Physical Plant Administrators of Universities and Colleges, Washington, DC.

    It is presumed that those reading this book presently own and operate a central control and monitoring system (CCMS) or plan to implement one in the near future. One objective of this workbook is to present useful knowledge from case histories of members of the Association of Physical Plant Administrators of Universities and Colleges as well as…

  13. 78 FR 885 - Approval and Promulgation of Air Quality Implementation Plans; Utah; Determination of Clean Data...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... finalizing a determination that the Ogden City nonattainment area in Utah is currently attaining the 24-hour... monitoring data for the years 2009 through 2011. The State of Utah submitted a letter dated March 30, 2000... attaining the 24-hour PM 10 NAAQS based on certified and quality-assured data from the most recent three...

  14. 75 FR 39635 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ..., quality-assured and certified ambient air quality monitoring data for the 2006-2008 ozone seasons that... data for the 2009 ozone season have been recorded in the EPA's Air Quality System (AQS) and show that... NAAQS through 2020 in the areas. EPA is approving the 2005 base year emissions inventories for the...

  15. Energy and remote sensing

    NASA Technical Reports Server (NTRS)

    Summers, R. A.; Smith, W. L.; Short, N. M.

    1977-01-01

    Effective implementation of the President's National Energy Plan and the Nuclear Power Policy Statement require application of the best remote sensing tools available. The potential contributions of remote sensing, particularly LANDSAT data, have yet to be clearly identified and exploited. These contributions investigated fall into the following categories: (1) exploration; (2) exploitation; (3) power plant siting; (4) environmental assessment and monitoring; and (5) transportation infrastructure.

  16. 40 CFR 52.2479 - Contents of the federally approved, State submitted implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-087 Prevention of significant deterioration (PSD) [02/19/91] 173-405-091 Special studies [02/19/91] 2... deterioration (PSD) [02/19/91] 173-410-100 Special studies [02/19/91] 2.2.415 WAC 173-415 Primary Aluminum...] 173-415-051 Prevention of significant deterioration (PSD) [02/19/91] 173-415-060 Monitoring and...

  17. 40 CFR 52.2479 - Contents of the federally approved, State submitted implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-087 Prevention of significant deterioration (PSD) [02/19/91] 173-405-091 Special studies [02/19/91] 2... deterioration (PSD) [02/19/91] 173-410-100 Special studies [02/19/91] 2.2.415 WAC 173-415 Primary Aluminum...] 173-415-051 Prevention of significant deterioration (PSD) [02/19/91] 173-415-060 Monitoring and...

  18. 77 FR 74421 - Approval and Promulgation of Air Quality Implementation Plans for PM2.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... calculation of future year PM 2.5 design values using the SMAT assumptions contained in the modeled guidance\\4... components. Future PM 2.5 design values at specified monitoring sites were estimated by adding the future... nonattainment area, all future site-specific PM 2.5 design values were below the concentration specified in the...

  19. An Application of the PMI Model at the Project Level Evaluation of ESEA Title IV-C Projects.

    ERIC Educational Resources Information Center

    McBeath, Marcia

    All of the papers presented as part of a symposium concerned the application of the Planning, Monitoring, and Implementation Model (PMI) to the evaluation of the District of Columbia Public Schools' programs supported by the Elementary Secondary Education Act (ESEA) Title IV-C. PMI was developed to provide a model for systematic evaluation of…

  20. Comparative Study of State Case Review Systems Phase II: Dispositional Hearings. National Survey. Volume I.

    ERIC Educational Resources Information Center

    Cahalan, Margaret; And Others

    Under the Adoption Assistance and Child Welfare Act of 1980 (P.L. 96-272), Congress outlined a case review system to assure that child welfare agencies monitor children under their care, that parental and child rights are protected, that agencies periodically report progress in implementing case plans, and that agencies work toward a permanent…

  1. 75 FR 8871 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... quality monitoring data for the 2007-2009 ozone seasons that demonstrate that the 8-hour ozone NAAQS has... technical information and/or data that you used. 5. If you estimate potential costs or burdens, explain how... FR 23857), EPA published a final rule designating and classifying areas under the 8-hour ozone NAAQS...

  2. A Qualitative Account of the Nature and Use of Self-Regulated Learning (SRL) Strategies Employed by University Students

    ERIC Educational Resources Information Center

    Alvi, Effat; Iqbal, Zafar; Masood, Fatima; Batool, Tooba

    2016-01-01

    Students' conceptions of how they initiate, plan, implement and monitor self-regulated learning (SRL) strategies have practical implications for teaching and learning. This study explores the nature and use of SRL strategies employed by university students as it occurs in naturalistic settings, for example, studying in non-classroom environments.…

  3. Planning an integrated agriculture and health program and designing its evaluation: Experience from Western Kenya.

    PubMed

    Cole, Donald C; Levin, Carol; Loechl, Cornelia; Thiele, Graham; Grant, Frederick; Girard, Aimee Webb; Sindi, Kirimi; Low, Jan

    2016-06-01

    Multi-sectoral programs that involve stakeholders in agriculture, nutrition and health care are essential for responding to nutrition problems such as vitamin A deficiency among pregnant and lactating women and their infants in many poor areas of lower income countries. Yet planning such multi-sectoral programs and designing appropriate evaluations, to respond to different disciplinary cultures of evidence, remain a challenge. We describe the context, program development process, and evaluation design of the Mama SASHA project (Sweetpotato Action for Security and Health in Africa) which promoted production and consumption of a bio-fortified, orange-fleshed sweetpotato (OFSP). In planning the program we drew upon information from needs assessments, stakeholder consultations, and a first round of the implementation evaluation of a pilot project. The multi-disciplinary team worked with partner organizations to develop a program theory of change and an impact pathway which identified aspects of the program that would be monitored and established evaluation methods. Responding to the growing demand for greater rigour in impact evaluations, we carried out quasi-experimental allocation by health facility catchment area, repeat village surveys for assessment of change in intervention and control areas, and longitudinal tracking of individual mother-child pairs. Mid-course corrections in program implementation were informed by program monitoring, regular feedback from implementers and partners' meetings. To assess economic efficiency and provide evidence for scaling we collected data on resources used and project expenses. Managing the multi-sectoral program and the mixed methods evaluation involved bargaining and trade-offs that were deemed essential to respond to the array of stakeholders, program funders and disciplines involved. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.

  4. Planning an integrated agriculture and health program and designing its evaluation: Experience from Western Kenya

    PubMed Central

    Cole, Donald C.; Levin, Carol; Loechl, Cornelia; Thiele, Graham; Grant, Frederick; Girard, Aimee Webb; Sindi, Kirimi; Low, Jan

    2016-01-01

    Multi-sectoral programs that involve stakeholders in agriculture, nutrition and health care are essential for responding to nutrition problems such as vitamin A deficiency among pregnant and lactating women and their infants in many poor areas of lower income countries. Yet planning such multi-sectoral programs and designing appropriate evaluations, to respond to different disciplinary cultures of evidence, remain a challenge. We describe the context, program development process, and evaluation design of the Mama SASHA project (Sweetpotato Action for Security and Health in Africa) which promoted production and consumption of a bio-fortified, orange-fleshed sweetpotato (OFSP). In planning the program we drew upon information from needs assessments, stakeholder consultations, and a first round of the implementation evaluation of a pilot project. The multi-disciplinary team worked with partner organizations to develop a program theory of change and an impact pathway which identified aspects of the program that would be monitored and established evaluation methods. Responding to the growing demand for greater rigour in impact evaluations, we carried out quasi-experimental allocation by health facility catchment area, repeat village surveys for assessment of change in intervention and control areas, and longitudinal tracking of individual mother-child pairs. Mid-course corrections in program implementation were informed by program monitoring, regular feedback from implementers and partners’ meetings. To assess economic efficiency and provide evidence for scaling we collected data on resources used and project expenses. Managing the multi-sectoral program and the mixed methods evaluation involved bargaining and trade-offs that were deemed essential to respond to the array of stakeholders, program funders and disciplines involved. PMID:27003730

  5. Continuous quality improvement interventions to improve long-term outcomes of antiretroviral therapy in women who initiated therapy during pregnancy or breastfeeding in the Democratic Republic of Congo: design of an open-label, parallel, group randomized trial.

    PubMed

    Yotebieng, Marcel; Behets, Frieda; Kawende, Bienvenu; Ravelomanana, Noro Lantoniaina Rosa; Tabala, Martine; Okitolonda, Emile W

    2017-04-26

    Despite the rapid adoption of the World Health Organization's 2013 guidelines, children continue to be infected with HIV perinatally because of sub-optimal adherence to the continuum of HIV care in maternal and child health (MCH) clinics. To achieve the UNAIDS goal of eliminating mother-to-child HIV transmission, multiple, adaptive interventions need to be implemented to improve adherence to the HIV continuum. The aim of this open label, parallel, group randomized trial is to evaluate the effectiveness of Continuous Quality Improvement (CQI) interventions implemented at facility and health district levels to improve retention in care and virological suppression through 24 months postpartum among pregnant and breastfeeding women receiving ART in MCH clinics in Kinshasa, Democratic Republic of Congo. Prior to randomization, the current monitoring and evaluation system will be strengthened to enable collection of high quality individual patient-level data necessary for timely indicators production and program outcomes monitoring to inform CQI interventions. Following randomization, in health districts randomized to CQI, quality improvement (QI) teams will be established at the district level and at MCH clinics level. For 18 months, QI teams will be brought together quarterly to identify key bottlenecks in the care delivery system using data from the monitoring system, develop an action plan to address those bottlenecks, and implement the action plan at the level of their district or clinics. If proven to be effective, CQI as designed here, could be scaled up rapidly in resource-scarce settings to accelerate progress towards the goal of an AIDS free generation. The protocol was retrospectively registered on February 7, 2017. ClinicalTrials.gov Identifier: NCT03048669 .

  6. Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC

    2009-09-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contaminationmore » and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.« less

  7. Scaling up a community-based program for maternal and child nutrition in Thailand.

    PubMed

    Winichagoon, Pattanee

    2014-06-01

    The first national nutrition survey of Thailand in 1960 revealed that malnutrition among children and women in this rice-exporting country was highly prevalent. Malnutrition received national-level attention in the 1970s, when a national multisectoral nutrition plan was included in the Fourth National Economic and Social Development Plan (NESDP) (1977-81), followed by effective implementation through Thailand's primary healthcare system and poverty alleviation plan in the 1982-87 NESDP. Nutrition was embedded into primary healthcare, and a community-based nutrition program was successfully implemented through community participation via manpower mobilization and capacity-building, financing, and organization. Growth-monitoring, promotion of infant and young child feeding, and joint financing (government and community) of a nutrition fund were implemented. The poverty alleviation plan made it possible to streamline resource allocations at the national level down to priority poverty areas, which also facilitated microlevel planning. Effective, integrated actions were undertaken using the basic minimum needs approach, wherein community people identified problems and participated in actions with inputs from government personnel. This effective process took about 5 years to put in place. In response, child undernutrition declined significantly. Severe malnutrition was practically eradicated, and it remains resilient despite social and economic challenges, such as the Asian economic crisis in 1977. Currently, stunting and subclinical micronutrient deficiencies remain, while overweight and obesity among children are rising rapidly. A different paradigm and strategy will be essential to address the nation's current nutrition challenges.

  8. Collaborative implementation for ecological restoration on US Public Lands: implications for legal context, accountability, and adaptive management.

    PubMed

    Butler, William H; Monroe, Ashley; McCaffrey, Sarah

    2015-03-01

    The Collaborative Forest Landscape Restoration Program (CFLRP), established in 2009, encourages collaborative landscape scale ecosystem restoration efforts on United States Forest Service (USFS) lands. Although the USFS employees have experience engaging in collaborative planning, CFLRP requires collaboration in implementation, a domain where little prior experience can be drawn on for guidance. The purpose of this research is to identify the ways in which CFLRP's collaborative participants and agency personnel conceptualize how stakeholders can contribute to implementation on landscape scale restoration projects, and to build theory on dynamics of collaborative implementation in environmental management. This research uses a grounded theory methodology to explore collaborative implementation from the perspectives and experiences of participants in landscapes selected as part of the CFLRP in 2010. Interviewees characterized collaborative implementation as encompassing three different types of activities: prioritization, enhancing treatments, and multiparty monitoring. The paper describes examples of activities in each of these categories and then identifies ways in which collaborative implementation in the context of CFLRP (1) is both hindered and enabled by overlapping legal mandates about agency collaboration, (2) creates opportunities for expanded accountability through informal and relational means, and, (3) creates feedback loops at multiple temporal and spatial scales through which monitoring information, prioritization, and implementation actions shape restoration work both within and across projects throughout the landscape creating more robust opportunities for adaptive management.

  9. Collaborative Implementation for Ecological Restoration on US Public Lands: Implications for Legal Context, Accountability, and Adaptive Management

    NASA Astrophysics Data System (ADS)

    Butler, William H.; Monroe, Ashley; McCaffrey, Sarah

    2015-03-01

    The Collaborative Forest Landscape Restoration Program (CFLRP), established in 2009, encourages collaborative landscape scale ecosystem restoration efforts on United States Forest Service (USFS) lands. Although the USFS employees have experience engaging in collaborative planning, CFLRP requires collaboration in implementation, a domain where little prior experience can be drawn on for guidance. The purpose of this research is to identify the ways in which CFLRP's collaborative participants and agency personnel conceptualize how stakeholders can contribute to implementation on landscape scale restoration projects, and to build theory on dynamics of collaborative implementation in environmental management. This research uses a grounded theory methodology to explore collaborative implementation from the perspectives and experiences of participants in landscapes selected as part of the CFLRP in 2010. Interviewees characterized collaborative implementation as encompassing three different types of activities: prioritization, enhancing treatments, and multiparty monitoring. The paper describes examples of activities in each of these categories and then identifies ways in which collaborative implementation in the context of CFLRP (1) is both hindered and enabled by overlapping legal mandates about agency collaboration, (2) creates opportunities for expanded accountability through informal and relational means, and, (3) creates feedback loops at multiple temporal and spatial scales through which monitoring information, prioritization, and implementation actions shape restoration work both within and across projects throughout the landscape creating more robust opportunities for adaptive management.

  10. [General Strategies for Implementation of Clinical Practice Guidelines].

    PubMed

    Valenzuela-Flores, Adriana Abigail; Viniegra-Osorio, Arturo; Torres-Arreola, Laura Laura

    2015-01-01

    The need to use clinical practice guidelines (CPG) arises from the health conditions and problems that public health institutions in the country face. CPG are informative documents that help improve the quality of care processes and patient safety; having among its objectives, to reduce the variability of medical practice. The Instituto Mexicano del Seguro Social designed a strategic plan for the dissemination, implementation, monitoring and control of CPG to establish an applicable model in the medical units in the three levels of care at the Instituto. This paper summarizes some of the strategies of the plan that were made with the knowledge and experience of clinicians and managers, with which they intend to promote the adoption of the key recommendations of the guidelines, to promote a sense of belonging for health personnel, and to encourage changes in organizational culture.

  11. Evaluating a novel health system intervention for chronic kidney disease care using the RE-AIM framework: Insights after two years.

    PubMed

    Hynes, Denise M; Fischer, Michael J; Schiffer, Linda A; Gallardo, Rani; Chukwudozie, Ifeanyi Beverly; Porter, Anna; Berbaum, Michael; Earheart, Jennifer; Fitzgibbon, Marian L

    2017-01-01

    Using a quasi-experimental design, we implemented the Patient-Centered Medical Home for Kidney Disease (PCMH-KD), a comprehensive, multidisciplinary care team to improve quality of life and healthcare coordination for adult chronic hemodialysis (CHD) patients. This paper highlights our experience in the first two years of the study. We focus on the process dimensions of Reach, Adoption, and Implementation within the context of the RE-AIM framework. We established a new PCMH-KD model at two outpatient dialysis centers. During the intervention phase, adult patients were recruited for participation and data collection. We monitored RE-AIM measures to identify areas for potential adaptation of the care model. During the start-up phase, we engaged patients and stakeholders in planning the intervention, established the new PCMH-KD team, and trained new and continuing clinicians and staff at two dialysis centers. In the intervention phase we recruited 155 patients to participate. Patients had individual visits with the PCP (40%) and the CHWs (92%) (Reach). Patient feedback informed procedures for appointment scheduling (Adoption). The new PCMH-KD team members were consistent in their roles. With staff changes, some responsibilities were adapted for cross coverage (Implementation). After one year of start-up and one year of intervention, active monitoring of Reach, Implementation and Adoption measures have facilitated necessary adaptions in the planned intervention to accommodate scheduling demands and patient feedback in the PCMH-KD model. Insights from this trial may inform care of CHD patients more broadly. Copyright © 2016. Published by Elsevier Inc.

  12. Sampling and monitoring for closure

    USGS Publications Warehouse

    McLemore, Virginia T.; Smith, Kathleen S.; Russell, Carol C.

    2007-01-01

    An important aspect of planning a new mine or mine expansion within the modern regulatory framework is to design for ultimate closure. Sampling and monitoring for closure is a form of environmental risk management. By implementing a sampling and monitoring program early in the life of the mining operation, major costs can be avoided or minimized. The costs for treating mine drainage in perpetuity are staggering, especially if they are unanticipated. The Metal Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS), a cooperative government-industry-academia organization, was established to address drainage-quality technologies of metal mining and metallurgical operations. ADTI-MMS recommends that sampling and monitoring programs consider the entire mine-life cycle and that data needed for closure of an operation be collected from exploration through postclosure.

  13. Four challenges in selecting and implementing methods to monitor and evaluate participatory processes: Example from the Rwenzori region, Uganda.

    PubMed

    Hassenforder, Emeline; Ducrot, Raphaëlle; Ferrand, Nils; Barreteau, Olivier; Anne Daniell, Katherine; Pittock, Jamie

    2016-09-15

    Participatory approaches are now increasingly recognized and used as an essential element of policies and programs, especially in regards to natural resource management (NRM). Most practitioners, decision-makers and researchers having adopted participatory approaches also acknowledge the need to monitor and evaluate such approaches in order to audit their effectiveness, support decision-making or improve learning. Many manuals and frameworks exist on how to carry out monitoring and evaluation (M&E) for participatory processes. However, few provide guidelines on the selection and implementation of M&E methods, an aspect which is also often obscure in published studies, at the expense of the transparency, reliability and validity of the study. In this paper, we argue that the selection and implementation of M&E methods are particularly strategic when monitoring and evaluating a participatory process. We demonstrate that evaluators of participatory processes have to tackle a quadruple challenge when selecting and implementing methods: using mixed-methods, both qualitative and quantitative; assessing the participatory process, its outcomes, and its context; taking into account both the theory and participants' views; and being both rigorous and adaptive. The M&E of a participatory planning process in the Rwenzori Region, Uganda, is used as an example to show how these challenges unfold on the ground and how they can be tackled. Based on this example, we conclude by providing tools and strategies that can be used by evaluators to ensure that they make utile, feasible, coherent, transparent and adaptive methodological choices when monitoring and evaluating participatory processes for NRM. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. Redesigning a Ministry of Health's organizational structure: exploring implementation challenges through Botswana's experiences.

    PubMed

    Seitio-Kgokgwe, Onalenna; Gauld, Robin D C; Hill, Philip C; Barnett, Pauline

    2016-04-01

    The Botswana's Ministry of Health redesigned and adopted a new organizational structure in 2005, which was poorly implemented. This article explores factors that influenced the implementation of this organizational structure. This article draws from data collected through in-depth interviews with 54 purposively selected key informants comprising policy makers, senior managers and staff of the Ministry of Health (N = 40) and senior officers from various stakeholder organizations (N = 14). Participants generally felt that the review of the Ministry of Health organizational structure was important. The previous structure was considered obsolete with fragmented functions that limited the overall performance of the health system. The new organizational structure was viewed to be aligned to current national priorities with potential to positively influence performance. Some key weaknesses identified included lack of consultation and information sharing with workers during the restructuring process, which affected the understanding of their new roles, failure to mobilize key resources to support implementation of the new structure and inadequate monitoring of the implementation process. Redesigning an organizational structure is a major change. There is a need for effective and sustained leadership to plan, direct, coordinate, monitor and evaluate the implementation phase of the reform. Copyright © 2014 John Wiley & Sons, Ltd. Copyright © 2014 John Wiley & Sons, Ltd.

  15. Communications Contingency Plan: Planning for Crises and Controversy. Phase 1

    NASA Technical Reports Server (NTRS)

    Treise, Deborah; Bernstein, Arla G.; Yates, Brad

    1998-01-01

    Interviews were conducted with a variety of Marshall Space Flight Center personnel and local media representatives in Huntsville, Alabama, in order to identify the current perceptions of these individuals regarding communication effectiveness between MSFC and the media. The purposes of the Phase One report are to (1) assess the need for a contingency plan for communicating in situations of crisis and controversy; (2) identify goals and objectives for the planning process; and (3) provide recommendations for future planning activities to achieve the goals and objectives outlined in Phase One. It is strongly recommended that MSFC personnel who are involved in communications with the media participate in a facilitated, strategic communications planning process in order to develop Phase Two of the Communications Contingency Plan (CCP). Phase Two will address (1) the categorizing, ranking and prioritizing of crises and controversies; (2) the development of action steps and implementation strategies for the CCP; and (3) the development of a monitoring and evaluation process for ongoing plan effectiveness.

  16. A blueprint for community benefit. A CHA-AAHA (Catholic Health Association-American Association of Homes for the Aging) document helps long-term care providers plan for and implement needed services.

    PubMed

    Forschner, B; Trocchio, J

    1993-05-01

    A collaborative effort of the Catholic Health Association (CHA) and the American Association of Homes for the Aging, The Social Accountability Program: Continuing the Community Benefit Tradition of Not-for-Profit Homes and Services for the Aging helps long-term care organizations plan and report community benefit activities. The program takes long-term care providers through five sequential tasks: reaffirming commitment to the elderly and others in the community; developing a community service plan; developing and providing community services; reporting community services; and evaluating the community service role. To help organizations reaffirm commitment, the Social Accountability Program presents a process facilities can use to review their historical roots and purposes and evaluate whether current policies and procedures are consistent with the organizational philosophy. Once this step is completed, providers can develop a community service plan by identifying target populations and the services they need. For facilities developing and implementing such services, the program suggests ways of measuring and monitoring them for budgetary purposes. Once they have implemented services, not-for-profit healthcare organizations must account for their impact on the community. The Social Accountability Program lists elements to be included in community service reports. It also provides guidelines for evaluating these services' effectiveness and the organization's overall community benefit role.

  17. Malaysia's Experience in the Monitoring of Investment and Results of Water Resources Management

    NASA Astrophysics Data System (ADS)

    Zakaria, Salmah Binti; Lee, Jin

    2010-05-01

    The current status of IWRM implementation in Malaysia, overview of development planning process and financial allocations together with monitoring of IWRM in Malaysia are first presented. This is followed by a case study review of Malaysia's 9th 5-year Development Plan (2005-2010) so as to provide a deeper understanding and appreciation of the current approach adopted by the Malaysian government in the formulation of development policies, project planning, budget allocation and o monitoring of projects. Arising from the review it was highlighted that the water-related, sectoral developmental objectives are found in all the 5 developmental thrusts in the 9th Malaysia Plan. This is because water is an essential natural resource and is also an economic good. Thus, it was concluded that in order for the monitoring of investments in IWRM and results to be effective and useful to support policy formulation to achieve the goal of IWRM there is a need for a collation of all information reported under the different, water-related, sectoral developmental objectives in the 9th Malaysia Plan to be organised within an IWRM framework. It was also concluded that a major IWRM challenge for Malaysia is how to make the transition from the current, narrow, sector-specific, financial and budgeting paradigm of the sectorial agencies to the “total cost” paradigm that involves taking into consideration and integrating the costs in other sectors affected by any projects proposed within a sector. The current, sectorial-focus approach, adopted in the 9th Malaysia Plan, logically measures the effectiveness of sectorial agencies by their ability to achieve their immediate sectorial goals and targets, most often with emphasis on infrastructure projects since the impacts of such projects are usually immediate and visible. However, the use of such approach alone, without taking into account the costs that are borne by other interfacing sectors, and also within the sector over the long term, is unsustainable.

  18. Geographic variation in premiums in health insurance marketplaces.

    PubMed

    Barker, Abigail R; McBride, Timothy D; Kemper, Leah M; Mueller, Keith

    2014-08-01

    This policy brief analyzes the 2014 premiums associated with qualified health plans (QHPs) made available through new health insurance marketplaces (HIMs), an implementation of the Patient Protection and Affordable Care Act (ACA) of 2010. We report differences in premiums by insurance rating areas while controlling for other important factors such as the actuarial value of the plan (metal level), cost-of-living differences, and state-level decisions over type of rating area. While market equilibrium, based on experience and understanding of the characteristics of the new market, should not be expected this soon, preliminary results give policymakers key issues to monitor.

  19. Path planning and execution monitoring for a planetary rover

    NASA Technical Reports Server (NTRS)

    Gat, Erann; Slack, Marc G.; Miller, David P.; Firby, R. James

    1990-01-01

    A path planner and an execution monitoring planner that will enable the rover to navigate to its various destinations safely and correctly while detecting and avoiding hazards are described. An overview of the complete architecture is given. Implementation and testbeds are described. The robot can detect unforseen obstacles and take appropriate action. This includes having the rover back away from the hazard and mark the area as untraversable in the in the rover's internal map. The experiments have consisted of paths roughly 20 m in length. The architecture works with a large variety of rover configurations with different kinematic constraints.

  20. Dose assessment of aircraft crew in The Netherlands.

    PubMed

    Van Dijk, J W E

    2003-01-01

    As the operator of the National Dose Registration and Information System, NRG has implemented a system for radiation exposure monitoring for the Dutch airlines. The system is based on the use of computer generated flight plans together with dose calculations using the CARI-6M program. Before installing the system a study was performed to estimate the uncertainty in the assessment of the annual dose of the crew members. It was concluded that the proposed system complies with international recommendations on the uncertainty in dose assessments in individual monitoring and that the operational costs of the system are low.

  1. A network collaboration implementing technology to improve medication dispensing and administration in critical access hospitals.

    PubMed

    Wakefield, Douglas S; Ward, Marcia M; Loes, Jean L; O'Brien, John

    2010-01-01

    We report how seven independent critical access hospitals collaborated with a rural referral hospital to standardize workflow policies and procedures while jointly implementing the same health information technologies (HITs) to enhance medication care processes. The study hospitals implemented the same electronic health record, computerized provider order entry, pharmacy information systems, automated dispensing cabinets (ADC), and barcode medication administration systems. We conducted interviews and examined project documents to explore factors underlying the successful implementation of ADC and barcode medication administration across the network hospitals. These included a shared culture of collaboration; strategic sequencing of HIT component implementation; interface among HIT components; strategic placement of ADCs; disciplined use and sharing of workflow analyses linked with HIT applications; planning for workflow efficiencies; acquisition of adequate supply of HIT-related devices; and establishing metrics to monitor HIT use and outcomes.

  2. Family Health Services project: the way forward.

    PubMed

    Dabiri, O M

    1993-01-01

    Nigerians did not readily accept family planning when Family Health Services (FHS) began in 1988. FHS has made much headway in training, IEC (information, education, and communication), and constituency building and advocacy. Its staff have identified obstacles to implementation, especially program sustainability and management structure. Key limits to sustainability of IEC efforts were inadequately trained personnel and inability of trained personnel to apply what they learned at work stations. The Federal Ministry and Social Services' role in the FHS project was not clearly defined. Some private sector factors contributing to a confused management structure were inadequate method mix, high contraceptive cost, poor monitoring of quality of care, and no coordination of family planning training with the public factor. FHS has since decided to focus its efforts on increasing the demand for and availability of modern contraceptives and improving the quality of family planning services of both the public and private sectors. FHS hopes that accomplishing these activities will reduce fertility, morbidity, and mortality. Strategic plans include a regional focus, quality of care, a variety of methods offered, intensification, hospital and clinics, a management information system, contraceptive logistics, distribution regulations, and addressing social, cultural, and behavioral factors. To effectively implement the strategy, USAID and the Federal Ministry held a workshop in 1993 to effect full integration of Nigerian experience in the 2nd phase of the project (FHS II). Participants reviewed the strengths and weaknesses of the first phase and agreed on implementation. For example, nongovernmental organizations should implement FHS II. FHS II includes training, IEC, and commodities/logistics.

  3. Y-12 Groundwater Protection Program Groundwater and Surface water Sampling and Analysis Plan for Calendar Year 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    2006-01-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2006 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2006 will be in accordance with DOE Order 540.1 requirements and the following goals: {sm_bullet} to maintain surveillance of existing and potential groundwater contamination sources; {sm_bullet} to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminantsmore » are most likely to migrate beyond the Oak Ridge Reservation property line; {sm_bullet} to identify and characterize long-term trends in groundwater quality at Y-12; and ! to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2006 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation (Figure A.1). Modifications to the CY 2006 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2006 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3; sample collection methods and procedures are described in Section 4; and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. The monitoring frequency and selection criteria for each sampling location is in Appendix C. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix D. If issued, addenda to this plan will be inserted in Appendix E, and Groundwater Monitoring Schedules (when issued) will be inserted in Appendix F. Guidance for managing purged groundwater is provided in Appendix G.« less

  4. AprenDes-PERU: Innovations in Decentralization and Active Schools. Report on Year 1. Aprendes Performance Monitoring Plan. Revision

    ERIC Educational Resources Information Center

    Montane, Angelica; Chesterfield, Ray

    2005-01-01

    This document summarizes the results obtained by the AprenDes project in 2004, the project's first year of implementation. It provides the principal findings on program performance from a baseline in May 2004 to the end of the school year (late October 2004). Progress on a number of project objectives related to decentralized school- and…

  5. Monitoring process hygiene in Serbian retail establishments

    NASA Astrophysics Data System (ADS)

    Vesković Moračanin, S.; Baltić, T.; Milojević, L.

    2017-09-01

    The present study was conducted to estimate the effectiveness of sanitary procedures on food contact surfaces and food handlers’ hands in Serbian retail establishments. For that purpose, a total of 970 samples from food contact surfaces and 525 samples from workers’ hands were microbiologically analyzed. Results of total aerobic plate count and total Enterobacteriaceae count showed that the implemented washing and disinfection procedures, as a part of HACCP plans, were not effective enough in most retail facilities. Constant and intensive education of employees on proper implementation of sanitation procedures are needed in order to ensure food safety in the retail market.

  6. Effective organizational solutions for implementation of DBMS software packages

    NASA Technical Reports Server (NTRS)

    Jones, D.

    1984-01-01

    The space telescope management information system development effort is a guideline for discussing effective organizational solutions used in implementing DBMS software. Focus is on the importance of strategic planning. The value of constructing an information system architecture to conform to the organization's managerial needs, the need for a senior decision maker, dealing with shifting user requirements, and the establishment of a reliable working relationship with the DBMS vendor are examined. Requirements for a schedule to demonstrate progress against a defined timeline and the importance of continued monitoring for production software control, production data control, and software enhancements are also discussed.

  7. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Lofy, Peter T.

    2002-11-01

    This is the second annual report of a multi-year, multi-agency project to restore spring chinook salmon populations in the Grande Ronde River Basin (Grande Ronde Endemic Chinook Salmon Program--GRESCP). The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operates adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to increase natural production and restore fisheries in these two streams. Statement of Work Objectives formore » 1999: (1) Participate in development and continued implementation of the comprehensive multi year operations plan for the Grande Ronde Endemic Supplementation Program. (2) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (3) Monitor adult endemic spring chinook salmon populations and collect broodstock. (4) Plan detailed Monitoring and Evaluation for future years. (5) Monitor population abundance and characteristics and local environmental factors that may influence abundance and run timing of Grande Ronde River spring chinook populations. (6) Participate in Monitoring and Evaluation of the captive brood component of the Program to assure this component is contributing to the Program. (7) Participate in data collection for incidentally-caught bull trout and summer steelhead and planning for recovery of summer steelhead populations. (8) Document accomplishments and needs to permitters, comanagers, and funding agencies. (9) Communicate project results to the scientific community.« less

  8. In vivo dosimetry for external photon treatments of head and neck cancers by diodes and TLDS.

    PubMed

    Tung, C J; Wang, H C; Lo, S H; Wu, J M; Wang, C J

    2004-01-01

    In vivo dosimetry was implemented for treatments of head and neck cancers in the large fields. Diode and thermoluminescence dosemeter (TLD) measurements were carried out for the linear accelerators of 6 MV photon beams. ESTRO in vivo dosimetry protocols were followed in the determination of midline doses from measurements of entrance and exit doses. Of the fields monitored by diodes, the maximum absolute deviation of measured midline doses from planned target doses was 8%, with the mean value and the standard deviation of -1.0 and 2.7%. If planned target doses were calculated using radiological water equivalent thicknesses rather than patient geometric thicknesses, the maximum absolute deviation dropped to 4%, with the mean and the standard deviation of 0.7 and 1.8%. For in vivo dosimetry monitored by TLDs, the shift in mean dose remained small but the statistical precision became poor.

  9. Watershed Characteristics and Land Management in the Nonpoint-Source Evaluation Monitoring Watersheds in Wisconsin

    USGS Publications Warehouse

    Rappold, K.F.; Wierl, J.A.; Amerson, F.U.

    1997-01-01

    In 1992, the Wisconsin Department of Natural Resources, in cooperation with the U.S. Geological Survey, began a land-use inventory to identify sources of contaminants and track the land-management changes for eight evaluation monitoring watersheds in Wisconsin. An important component of the land-use inventory has been developing descriptions and preliminary assessments for the eight watersheds. These descriptions establish a baseline for future data analysis. The watershed descriptions include sections on location, reference watersheds, climate, land use, soils and topography, and surface-water resources. The land-management descriptions include sections on objectives, sources of nonpoint contamination and goals of contaminant reduction, and implementation of best-management practices. This information was compiled primarily from the nonpoint-source control plans, county soil surveys, farm conservation plans, Federal and State agency data reports, and data collected through the land-use inventory.

  10. Determinants of treatment plan implementation in multidisciplinary team meetings for patients with chronic diseases: a mixed-methods study

    PubMed Central

    Raine, Rosalind; Xanthopoulou, Penny; Wallace, Isla; Nic a’ Bháird, Caoimhe; Lanceley, Anne; Clarke, Alex; Livingston, Gill; Prentice, Archie; Ardron, Dave; Harris, Miriam; King, Michael; Michie, Susan; Blazeby, Jane M; Austin-Parsons, Natalie; Gibbs, Simon; Barber, Julie

    2014-01-01

    Objective Multidisciplinary team (MDT) meetings are assumed to produce better decisions and are extensively used to manage chronic disease in the National Health Service (NHS). However, evidence for their effectiveness is mixed. Our objective was to investigate determinants of MDT effectiveness by examining factors influencing the implementation of MDT treatment plans. This is a proxy measure of effectiveness, because it lies on the pathway to improvements in health, and reflects team decision making which has taken account of clinical and non-clinical information. Additionally, this measure can be compared across MDTs for different conditions. Methods We undertook a prospective mixed-methods study of 12 MDTs in London and North Thames. Data were collected by observation of 370 MDT meetings, interviews with 53 MDT members, and from 2654 patient medical records. We examined the influence of patient-related factors (disease, age, sex, deprivation, whether their preferences and other clinical/health behaviours were mentioned) and MDT features (as measured using the ‘Team Climate Inventory’ and skill mix) on the implementation of MDT treatment plans. Results The adjusted odds (or likelihood) of implementation was reduced by 25% for each additional professional group represented at the MDT meeting. Implementation was more likely in MDTs with clear goals and processes and a good ‘Team Climate’ (adjusted OR 1.96; 95% CI 1.15 to 3.31 for a unit increase in Team Climate Inventory (TCI) score). Implementation varied by disease category, with the lowest adjusted odds of implementation in mental health teams. Implementation was also lower for patients living in more deprived areas (adjusted odds of implementation for patients in the most compared with least deprived areas was 0.60, 95% CI 0.39 to 0.91). Conclusions Greater multidisciplinarity is not necessarily associated with more effective decision making. Explicit goals and procedures are also crucial. Decision implementation should be routinely monitored to ensure the equitable provision of care. PMID:24915539

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental LLC

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2009 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2009 will be in accordance with DOE Order 540.1 requirements and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination andmore » determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2009 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2009 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2009 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3; sample collection methods and procedures are described in Section 4; and Section 5 lists the documents cited for more detailed operational and technical information.« less

  12. 40 CFR 63.1187 - What do I need to know about operations, maintenance, and monitoring plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations, maintenance, and monitoring plans? 63.1187 Section 63.1187 Protection of Environment... about operations, maintenance, and monitoring plans? (a) An operations, maintenance, and monitoring plan... title V permit. (b) The operations, maintenance, and monitoring plan must include the following: (1...

  13. Sector activities and lessons learned around initial implementation of the United States national physical activity plan.

    PubMed

    Evenson, Kelly R; Satinsky, Sara B

    2014-08-01

    National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans.

  14. Sector Activities and Lessons Learned Around Initial Implementation of the United States National Physical Activity Plan

    PubMed Central

    Evenson, Kelly R.; Satinsky, Sara B.

    2016-01-01

    Background National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. Methods During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. Results The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. Conclusions These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans. PMID:24176800

  15. Designing a global monitoring system for pilot introduction of a new contraceptive technology, subcutaneous DMPA (DMPA-SC).

    PubMed

    Stout, Anna; Wood, Siri; Namagembe, Allen; Kaboré, Alain; Siddo, Daouda; Ndione, Ida

    2018-06-01

    In collaboration with ministries of health, PATH and key partners launched the first pilot introductions of subcutaneous depot medroxyprogesterone acetate (DMPA-SC, brand name Sayana ® Press) in Burkina Faso, Niger, Senegal, and Uganda from July 2014 through June 2016. While each country implemented a unique introduction strategy, all agreed to track a set of uniform indicators to chart the effect of introducing this new method across settings. Existing national health information systems (HIS) were unable to track new methods or delivery channels introduced for a pilot, thus were not a feasible source for project data. We successfully monitored the four-country pilot introductions by implementing a four-phase approach: 1) developing and defining global indicators, 2) integrating indicators into existing country data collection tools, 3) facilitating consistent reporting and data management, and 4) analyzing and interpreting data and sharing results. Project partners leveraged existing family planning registers to the extent possible, and introduced new or modified data collection and reporting tools to generate project-specific data where necessary. We routinely shared monitoring results with global and national stakeholders, informing decisions about future investments in the product and scale up of DMPA-SC nationwide. Our process and lessons learned may provide insights for countries planning to introduce DMPA-SC or other new contraceptive methods in settings where stakeholder expectations for measureable results for decision-making are high. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.

  16. A Climate Change Adaptation Strategy for Management of ...

    EPA Pesticide Factsheets

    Sea level rise is causing shoreline erosion, increased coastal flooding, and marsh vulnerability to the impact of storms. Coastal marshes provide flood abatement, carbon and nutrient sequestration, water quality maintenance, and habitat for fish, shellfish, and wildlife, including species of concern, such as the saltmarsh sparrow (Ammodramus caudacutus). We present a climate change adaptation strategy (CCAS) adopted by scientific, management, and policy stakeholders for managing coastal marshes and enhancing system resiliency. A common adaptive management approach previously used for restoration projects was modified to identify climate-related vulnerabilities and plan climate change adaptive actions. As an example of implementation of the CCAS, we describe the stakeholder plans and management actions the US Fish and Wildlife Service and partners developed to build coastal resiliency in the Narrow River Estuary, RI, in the aftermath of Superstorm Sandy. When possible, an experimental BACI (before-after, control-impact) design, described as pre- and post-sampling at the impact site and one or more control sites, was incorporated into the climate change adaptation and implementation plans. Specific climate change adaptive actions and monitoring plans are described and include shoreline stabilization, restoring marsh drainage, increasing marsh elevation, and enabling upland marsh migration. The CCAS provides a framework and methodology for successfully managing coa

  17. Advantages of a Web-Based Real-Time Bed-Management System for Hospital Admission Monitoring in Iran.

    PubMed

    Abedian, Somayeh; Bitaraf, Ehsan; Askari, Marjan

    2018-01-01

    Lack of up-to-date information of hospitals beds, specifically in emergencies, is a significant problem in many large countries; The Ministry of Health and Medical Education of Iran (MOHME) designed and implemented a dynamic system that reports the status of beds in 2012. This system created great opportunities for national bed management, including real-time hospital admission monitoring, especially for emergency departments, ICUs and CCUs. Therefore, an additional online system was planned to be implemented for monitoring hospital admissions, including a national alert system. Prior to the design of this system, a study was done using literature study and expert opinion to investigate the advantages and features that this monitoring system was required to have. We used the MoSCoW method to prioritize the requirements of the system. This system was designed to have the following advantages, among other things: the hospitals as well as government should be able to track the patients, manage patient distribution in healthcare centers, and make policy for supplying extra beds. It should also be possible for the hospitals executive board, as well as the government, to monitor the performance of the hospitals regarding patient admissions (i.e., the rate of rejection of patients with severe conditions).

  18. Real-time beam monitoring in scanned proton therapy

    NASA Astrophysics Data System (ADS)

    Klimpki, G.; Eichin, M.; Bula, C.; Rechsteiner, U.; Psoroulas, S.; Weber, D. C.; Lomax, A.; Meer, D.

    2018-05-01

    When treating cancerous tissues with protons beams, many centers make use of a step-and-shoot irradiation technique, in which the beam is steered to discrete grid points in the tumor volume. For safety reasons, the irradiation is supervised by an independent monitoring system validating cyclically that the correct amount of protons has been delivered to the correct position in the patient. Whenever unacceptable inaccuracies are detected, the irradiation can be interrupted to reinforce a high degree of radiation protection. At the Paul Scherrer Institute, we plan to irradiate tumors continuously. By giving up the idea of discrete grid points, we aim to be faster and more flexible in the irradiation. But the increase in speed and dynamics necessitates a highly responsive monitoring system to guarantee the same level of patient safety as for conventional step-and-shoot irradiations. Hence, we developed and implemented real-time monitoring of the proton beam current and position. As such, we read out diagnostic devices with 100 kHz and compare their signals against safety tolerances in an FPGA. In this paper, we report on necessary software and firmware enhancements of our control system and test their functionality based on three exemplary error scenarios. We demonstrate successful implementation of real-time beam monitoring and, consequently, compliance with international patient safety regulations.

  19. Protocols for collection of streamflow, water-quality, streambed-sediment, periphyton, macroinvertebrate, fish, and habitat data to describe stream quality for the Hydrobiological Monitoring Program, Equus Beds Aquifer Storage and Recovery Program, city of Wichita, Kansas

    USGS Publications Warehouse

    Stone, Mandy L.; Rasmussen, Teresa J.; Bennett, Trudy J.; Poulton, Barry C.; Ziegler, Andrew C.

    2012-01-01

    The city of Wichita, Kansas uses the Equus Beds aquifer, one of two sources, for municipal water supply. To meet future water needs, plans for artificial recharge of the aquifer have been implemented in several phases. Phase I of the Equus Beds Aquifer Storage and Recovery (ASR) Program began with injection of water from the Little Arkansas River into the aquifer for storage and subsequent recovery in 2006. Construction of a river intake structure and surface-water treatment plant began as implementation of Phase II of the Equus Beds ASR Program in 2010. An important aspect of the ASR Program is the monitoring of water quality and the effects of recharge activities on stream conditions. Physical, chemical, and biological data provide the basis for an integrated assessment of stream quality. This report describes protocols for collecting streamflow, water-quality, streambed-sediment, periphyton, macroinvertebrate, fish, and habitat data as part of the city of Wichita's hydrobiological monitoring program (HBMP). Following consistent and reliable methods for data collection and processing is imperative for the long-term success of the monitoring program.

  20. Report on Non-invasive acoustic monitoring of D2O concentration Oct 31 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pantea, Cristian; Sinha, Dipen N.; Lakis, Rollin Evan

    There is an urgent need for real-time monitoring of the hydrogen /deuterium ratio (H/D) for heavy water production monitoring. Based upon published literature, sound speed is sensitive to the deuterium content of heavy water and can be measured using existing acoustic methods to determine the deuterium concentration in heavy water solutions. We plan to adapt existing non-invasive acoustic techniques (Swept-Frequency Acoustic Interferometry and Gaussian-pulse acoustic technique) for the purpose of quantifying H/D ratios in solution. A successful demonstration will provide an easily implemented, low cost, and non-invasive method for remote and unattended H/D ratio measurements with a resolution of lessmore » than 0.2% vol.« less

Top