Sample records for planning level final

  1. Developing and Testing Simulated Occupational Experiences for Distributive Education Students in Rural Communities: Volume III: Training Plans: Final Report.

    ERIC Educational Resources Information Center

    Virginia Polytechnic Inst. and State Univ., Blacksburg.

    Volume 3 of a three volume final report presents prototype job training plans developed as part of a research project which pilot tested a distributive education program for rural schools utilizing a retail store simulation plan. The plans are for 15 entry-level and 15 career-level jobs in seven categories of distributive business (department…

  2. Nebraska State Plan Career Education Project. Final Performance Report for Period Ending June 30, 1977.

    ERIC Educational Resources Information Center

    Nebraska State Dept. of Education, Lincoln.

    The Nebraska state career education plan was developed to assist individuals in developing essential educational and career skills for responsible functioning. The plan, linking the school and work world, extends chronologically: elementary level--career awareness, middle/junior high school level--career exploration, and senior high school…

  3. Designing Training Plans for Distributive Education. Final Report.

    ERIC Educational Resources Information Center

    Syhlman, William D.

    These distributive education training and development plans for secondary-level programs provide lists of competencies a student needs to hold a job in sales and marketing occupational areas. The design of the training plans is based on a "pyramid" which incorporates the following five sections or levels of competencies (from general to…

  4. Long-Range Strategic Planning for Libraries & Information Resources in the Research University. The Final Report on a Research Program on the Future of the Academic Research Library.

    ERIC Educational Resources Information Center

    California Univ., Los Angeles. Graduate School of Library and Information Science.

    This final report on a project at the University of California at Los Angeles (UCLA) on strategic planning for libraries and information resources in the research university begins with an introductory section on levels of consideration in planning; issues of current concern (effects of technology, economics of libraries, changes in the academic…

  5. Feasibility Study for Low Drag Acoustic Liners Final Report

    NASA Technical Reports Server (NTRS)

    Riedel, Brian; Wu, Jackie

    2017-01-01

    This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.

  6. Geneva-on-the-Lake, Ohio. Small-Boat Harbor. Final Reformulation. Phase I. General Design Memorandum and Final Environmental Impact Statement.

    DTIC Science & Technology

    1981-08-01

    This item of local $1,901,000______ on Ocoe 90prc ees .J$190,000 on October 1980 price levels. ..$9,00 on October 1980 price levels. 6 cooperation...physical model in October 1980 . Initial testing of the recommended alternative was then started in November 1980 . However, because the model study could not...Appendix C of the Plan of Study for this project. Both the completed Plan of Study and the Stage 2 Document, July 1979 (revised April 1980 ) for this

  7. Traffic Management Plan Effectiveness Study, Final Report

    DOT National Transportation Integrated Search

    1993-05-28

    MULTI-DIMENSIONAL TRAFFIC MANAGEMENT PLANS (TMPS) HAVE BECOME INCREASINGLY ACCEPTED BY TRANSPORTATION PROFESSIONALS, STATE AND LOCAL GOVERNMENTS AND THE PUBLIC AS A VIABLE MEANS OF MAINTANING ACCEPTABLE LEVELS OF TRAFFIC FLOW DURING PERIODS OF TRAFFI...

  8. Community and facility-level engagement in planning and budgeting for the government health sector--a district perspective from Kenya.

    PubMed

    O'Meara, Wendy Prudhomme; Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine; McKenzie, F Ellis

    2011-03-01

    Health systems reform processes have increasingly recognized the essential contribution of communities to the success of health programs and development activities in general. Here we examine the experience from Kilifi district in Kenya of implementing annual health sector planning guidelines that included community participation in problem identification, priority setting, and planning. We describe challenges in the implementation of national planning guidelines, how these were met, and how they influenced final plans and budgets. The broad-based community engagement envisaged in the guidelines did not take place due to the delay in roll out of the Ministry of Health-trained community health workers. Instead, community engagement was conducted through facility management committees, though in a minority of facilities, even such committees were not involved. Some overlap was found in the priorities highlighted by facility staff, committee members and national indicators, but there were also many additional issues raised by committee members and not by other groups. The engagement of the community through committees influenced target and priority setting, but the emphasis on national health indicators left many local priorities unaddressed by the final work plans. Moreover, it appears that the final impact on budgets allocated at district and facility level was limited. The experience in Kilifi highlights the feasibility of engaging the community in the health planning process, and the challenges of ensuring that this engagement feeds into consolidated plans and future implementation. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  9. Methane Hydrate Field Program: Development of a Scientific Plan for a Methane Hydrate-Focused Marine Drilling, Logging and Coring Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Myers, Greg

    This final report document summarizes the activities undertaken and the output from three primary deliverables generated during this project. This fifteen month effort comprised numerous key steps including the creation of an international methane hydrate science team, determining and reporting the current state of marine methane hydrate research, convening an international workshop to collect the ideas needed to write a comprehensive Marine Methane Hydrate Field Research Plan and the development and publication of that plan. The following documents represent the primary deliverables of this project and are discussed in summary level detail in this final report: Historical Methane Hydrate Projectmore » Review Report; Methane Hydrate Workshop Report; Topical Report: Marine Methane Hydrate Field Research Plan; and Final Scientific/Technical Report.« less

  10. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  11. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  12. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  13. Developing a Career Planning Center. Occupational Education Research Project Final Report.

    ERIC Educational Resources Information Center

    Kidd, Frank E.; Embry, Judy K.

    Designed as a guide for those community college institutions developing a career planning center, this handbook presents a model for planning and implementing such a center. Options for centers are suggested for three levels of development and staffing: self-directed, intermediate, and comprehensive. Chapter 1 outlines the rationale and possible…

  14. Energy conserving site design case study: Shenandoah, Georgia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The case study examines the means by which energy conservation can be achieved at an aggregate community level by using proper planning and analytical techniques for a new town, Shenandoah, Georgia, located twenty-five miles southwest of Atlanta's Hartsfield International Airport. A potentially implementable energy conservation community plan is achieved by a study team examining the land use options, siting characteristics of each building type, alternate infrastructure plans, possible decentralized energy options, and central utility schemes to determine how community energy conservation can be achieved by use of pre-construction planning. The concept for the development of mixed land uses as amore » passively sited, energy conserving community is based on a plan (Level 1 Plan) that uses the natural site characteristics, maximizes on passive energy siting requirement, and allows flexibility for the changing needs of the developers. The Level 2 Plan is identical with Level 1 plan plus a series of decentraized systems that have been added to the residential units: the single-family detached, the apartments, and the townhouses. Level 3 Plan is similar to the Level 1 Plan except that higher density dwellings have been moved to areas adjacent to central site. The total energy savings for each plan relative to the conventional plan are indicated. (MCW)« less

  15. A Literature Review On Multimodal Freight Transportation Planning Under Disruptions

    NASA Astrophysics Data System (ADS)

    Rosyida, E. E.; Santosa, B.; Pujawan, I. N.

    2018-04-01

    This paper reviews publication that focuses on multimodal freight transportation planning under disruptions. In this paper, disruptions are specified by the level of the disruptions occurs and the scope of its effect. This becomes an important distinction since the cause and effect that may occur at different levels. The failure to make this distinction has implications for how we understand and manage. The reviewed papers include those that develop framework, model, and technical procedure for freight transportation. Finally, we provide an outlook of future research directions on the domain of transportation planning.

  16. The PISA Project: A Final Report.

    ERIC Educational Resources Information Center

    Buhler-Miko, Marina

    With the support of a 3-year grant from the Fund for The Improvement of Postsecondary Education (FIPSE), the Higher Education Strategic Planning Institute has built a shared experience strategic planning database for college and university top-level management. The Performance Improvement through Strategy Analysis (PISA) program began in 1982 with…

  17. Kentucky Allied Health Project Final Report: A State System for Allied Health Education.

    ERIC Educational Resources Information Center

    Kentucky State Council on Higher Education, Frankfort.

    The accomplishments of the Kentucky Allied Health Project, which implemented a model articulated system of allied health education, are described. The system included plans to promote transition from one education level to another and articulation in educational planning and resource utilization. The project has greatly increased…

  18. Pre-Vocational Education Workshop, July 8-19, 1974. Final Report.

    ERIC Educational Resources Information Center

    Lorenz, James; Putnam, Margaret

    The report describes a workshop held to facilitate compliance with recent Tennessee legislation and organized to: (1) plan a model pre-vocational education program at the seventh and eighth grade level and (2) plan for personnel development for teachers, counselors, coordinators, and others responsible for prevocational education programs.…

  19. Interagency Planning and Support Project. Final Report.

    ERIC Educational Resources Information Center

    Salisbury, Christine

    This final report describes the activities and outcomes of a federally funded project designed to develop, implement, and evaluate a systemically oriented process model for improving the coordination of education and human services for young children with identified disabilities and their families at the local level. The project developed and used…

  20. Maritime Strike Operations Tactics Development and Evaluation, Eglin Air Force Base, Florida. Final Environmental Assessment

    DTIC Science & Technology

    2013-05-01

    Regulation The Proposed Action would not affect local government comprehensive plans. Requires local governments to prepare, adopt, and implement...state-level planning efforts. Requires the development of special statewide plans governing water use, land development, and transportation...cleared area in state waters. However, avoidance of this area would not be significantly burdensome for tourists or recreational users of the Gulf, as

  1. Accessibility-based evaluation of transportation and land-use planning : from laboratory to practice : USDOT Region V Regional University Transportation Center final report.

    DOT National Transportation Integrated Search

    2016-12-16

    The concept of accessibility has made inroads into planning practice, largely at the system level. That is, accessibility is measured or modeled for current or future regional transportation and land-use scenarios for evaluation or broad policy guida...

  2. Model Plan for Administration and Supervision Services. (Student Vocational Organization Coordinator.) Final Report.

    ERIC Educational Resources Information Center

    Wonser, Renee; Kohns, Donald

    Growing out of a project to improve administrative and support services for North Dakota student vocational organizations, this manual outlines possible duties and responsibilities of a state-level student vocational organizational coordinator based on a sequential planning and implementation system. The manual is divided into four areas with…

  3. Coosa River Storage Annex, Talladega, Alabama Environmental Investigation, Final Management and Resources Utilization Plan

    DTIC Science & Technology

    1991-02-01

    to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as

  4. Encoding and choice in the task span paradigm.

    PubMed

    Reiman, Kaitlin M; Weaver, Starla M; Arrington, Catherine M

    2015-03-01

    Cognitive control during sequences of planned behaviors requires both plan-level processes such as generating, maintaining, and monitoring the plan, as well as task-level processes such as selecting, establishing and implementing specific task sets. The task span paradigm (Logan in J Exp Psychol Gen 133:218-236, 2004) combines two common cognitive control paradigms, task switching and working memory span, to investigate the integration of plan-level and task-level processes during control of sequential behavior. The current study expands past task span research to include measures of encoding processes and choice behavior with volitional sequence generation, using the standard task span as well as a novel voluntary task span paradigm. In two experiments, we consider how sequence complexity, defined separately for plan-level and task-level complexity, influences sequence encoding (Experiment 1), sequence choice (Experiment 2), sequence memory, and task performance of planned sequences of action. Results indicate that participants were sensitive to sequence complexity, but that different aspects of behavior are most strongly influenced by different types of complexity. Hierarchical complexity at the plan level best predicts voluntary sequence generation and memory; while switch frequency at the task level best predicts encoding of externally defined sequences and task performance. Furthermore, performance RTs were similar for externally and internally defined plans, whereas memory was improved for internally defined sequences. Finally, participants demonstrated a significant sequence choice bias in the voluntary task span. Consistent with past research on choice behavior, volitional selection of plans was markedly influenced by both the ease of memory and performance.

  5. Superfund Record of Decision (EPA Region 4): Milan Army Ammunition Plant, Milan, TN, March 11, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-09-01

    This decision document presents the selected action for the Salvage Yard, Former Ammunition Burnout Area (ABA), and Sanitary Landfill at MLAAP, located in Gibson and Carroll Counties, TN. This ROD addresses the final response action planned for the Salvage Yard, Former ABA, and Sanitary Landfill, including soil and groundwater. NFA is the selected remedy for soil and groundwater at the Salvage Yard, Former ABA, and Sanitary landfill. The selected remedy manages the risk to acceptable levels for both human health and the environment and is the final action planned.

  6. Manufacturing Curriculum Grant. Final Report.

    ERIC Educational Resources Information Center

    Scarborough, Jule Dee

    A manufacturing curriculum for secondary vocational programs was designed to bridge the gap between grades 9-10 level courses and the community college-level curriculum of the Illinois Plan for Industrial Education. During the project, a literature review of manufacturing curriculum materials was conducted, a manufacturing conceptual framework was…

  7. Operational Plan Ontology Model for Interconnection and Interoperability

    NASA Astrophysics Data System (ADS)

    Long, F.; Sun, Y. K.; Shi, H. Q.

    2017-03-01

    Aiming at the assistant decision-making system’s bottleneck of processing the operational plan data and information, this paper starts from the analysis of the problem of traditional expression and the technical advantage of ontology, and then it defines the elements of the operational plan ontology model and determines the basis of construction. Later, it builds up a semi-knowledge-level operational plan ontology model. Finally, it probes into the operational plan expression based on the operational plan ontology model and the usage of the application software. Thus, this paper has the theoretical significance and application value in the improvement of interconnection and interoperability of the operational plan among assistant decision-making systems.

  8. Housing Value Projection Model Related to Educational Planning: The Feasibility of a New Methodology. Final Report.

    ERIC Educational Resources Information Center

    Helbock, Richard W.; Marker, Gordon

    This study concerns the feasibility of a Markov chain model for projecting housing values and racial mixes. Such projections could be used in planning the layout of school districts to achieve desired levels of socioeconomic heterogeneity. Based upon the concepts and assumptions underlying a Markov chain model, it is concluded that such a model is…

  9. From Constructs to Measures: Finalizing the Common Core. The Project on State-Level Child Outcomes.

    ERIC Educational Resources Information Center

    Child Trends, Inc., Washington, DC.

    The U.S. Department of Health and Human Services' Office of Planning, Research, and Evaluation at the Administration for Children and Families, and the Office of the Assistant Secretary for Planning and Evaluation, are working together with states and other groups to improve the measurement of child outcomes in state welfare evaluations and in…

  10. A Human-Centered C2 Assessment of Model and Simulation Enhanced Planning Tools

    DTIC Science & Technology

    2014-06-01

    al., 1985) and accounted for 55% of the variance in students’ final course points (Goldsmith and Johnson, 1990). An Afghanistan expert knowledge...elements of power. Q9. The plan contains more than one branch to account for multiple theories and ambiguity in some data. Q3. COMPOEX allowed the...The plan contains more than one branch to account for multiple theories and ambiguity in some data. Q15. The MRMs are at an appropriate level to

  11. Nursing workforce planning: insights from seven Malaysian hospitals.

    PubMed

    Drake, Robert

    In 2010, the Royal College of Nursing asked: 'What is the optimal level and mix of nurses required to deliver quality care as cost-effectively as possible?' This question implies there is a relationship between staffing levels, quality of care and financial efficiency. This paper examines the relationship between the staff budget, the number of staff required to achieve a target level of care and the actual number of staff employed in seven hospitals in Malaysia. It seeks to critically evaluate local challenges arising from staff budgeting/planning procedures, identify general issues that apply beyond Malaysian healthcare institutions and, finally, to propose a model that combines finance, staffing and level of care.

  12. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  13. MO-G-201-01: A Multi-Institutional Study Investigating the Performance of a Knowledge-Based Planning System Against Pinnacle Auto-Planning Engine in SIB-IMRT for the Head-And-Neck Cancer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, B; Pang, D; Kusters, M

    Purpose: Knowledge-based Planning (KBP) founded on prior planning experience and Auto-Planning Engine (APE; commercialized in Pinnacle v9.10 TPS) based on progressive optimization algorithm both aim to eliminate the trial-and-error process in radiotherapy inverse planning. This study investigates the performance of the approaches in a multi-institutional setting to evaluate their functionalities in oropharyngeal cancer and offers suggestions how they can be implemented in the clinic. Methods: Radboud University Medical Center (RUMC) provided 35 oropharyngeal cancer patients (SIB-IMRT with two-dose-level prescription: 68 Gy to PTV68 and 50.3 Gy to PTV50.3) with corresponding comparative APE plans. Johns Hopkins University (JHU) contributed to amore » three-dose-level (70 Gy 63 Gy and 58.1 Gy) plan library for RUMC’s patient KBP generation. MedStar Georgetown University Hospital (MGUH) contributed to a KBP approach employing overlap-volume histogram (OVH-KBP) for generating RUMC’s patient KBP plans using JHU’s plan library. Since both approaches need their own user-defined parameters as initial inputs the first 10 patients were set aside as training set to finalize them. Meanwhile cross-institutional comparisons and adjustments were implemented for investigating institutions’ protocol discrepancies and the approaches’ user-defined parameters were updated accordingly. The finalized parameters were then applied to the remaining 25 patients for OVH-KBP and APE generation. A Wilcoxon rank-sum test was used for statistical comparison with significance level of p<0.05. Results: On average PTV68’s V95 was 96.5% in APE plans vs. 97% in OVH-KBP plans (p=0.36); PTV50.3’s V95 in APE plans was 97.8% vs.97.6% in OVH-KBP plans (p=0.6); cord’s D0.1 cc was 38.6 Gy in OVH-KBP plans vs. 43.7 Gy in APE plans (p=0.0001); mean doses to larynxes oral cavities parotids and submandibular glands were similar with p>0.2. Conclusions: The study demonstrates that KBP and APE can generate plans of comparable quality in a multi-institutional setting. Variations in clinical protocols can be effectively addressed for cross-institutional adaptations. Binbin Wu and Todd McNutt are the co-inventors of a patent associated with the proposed knowledge-based planning system which was licensed to Varian Medical Systems in 2015; This research was in part supported by Philips Radiation Oncology Systems.« less

  14. Use of information systems in Air Force medical treatment facilities in strategic planning and decision-making.

    PubMed

    Yap, Glenn A; Platonova, Elena A; Musa, Philip F

    2006-02-01

    An exploratory study used Ansoff's strategic planning model as a framework to assess perceived effectiveness of information systems in supporting strategic business plan development at Air Force medical treatment facilities (MTFs). Results showed information systems were most effective in supporting historical trend analysis, strategic business plans appeared to be a balance of operational and strategic plans, and facilities perceived a greater need for new clinical, vice administrative, information systems to support strategic planning processes. Administrators believed information systems should not be developed at the local level and perceived information systems have the greatest impact on improving clinical quality outcomes, followed by ability to deliver cost effective care and finally, ability to increase market share.

  15. Acoustics Critical Readiness Review

    NASA Technical Reports Server (NTRS)

    Ballard, Kenny

    2010-01-01

    This presentation reviews the status of the acoustic equipment from the medical operations perspective. Included is information about the acoustic dosimeters, sound level meter, and headphones that are planned for use while on orbit. Finally there is information about on-orbit hearing assessments.

  16. 77 FR 76510 - Prime Hook National Wildlife Refuge, Sussex County, DE; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... included climate change, sea level rise, refuge marshes, habitat and wildlife species management, mosquito... adulticides for mosquito control when there is a documented human disease threat, instead of only when a...

  17. A Summary and Perspective of Recent IRIS Assessments and Impact on Planning Environmental Investigations

    DTIC Science & Technology

    2011-03-30

    or remediation  Used with regulatory values to determine cleanup levels  Risk-based screening levels (aka PRGs, RBCs, RSLs) ►Screen sites early in...Final IRIS Values for Hydrogen Cyanide and Cyanide Salts (September 2010)  New Oral noncancer RfD = 0.0006 mg/kg- day; male reproduction effects

  18. Job Entry Level Competencies of a One Year Barber School Graduate. Final Report.

    ERIC Educational Resources Information Center

    Swerman, Richard A.; Wurtzel, Norbert K.

    To determine the competency level required of a one-year graduate from barber school and to obtain information that would enable vocational-technical schools to plan their curriculum to better meet student barber needs, a survey was conducted in Wisconsin of 629 barber shop managers, 75 journeymen, and 200 apprentices. Picked at random, these…

  19. 78 FR 76176 - Notice of Availability of the Record of Decision for the Final Trail Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ...] Notice of Availability of the Record of Decision for the Final Trail Management Plan/Environmental Impact... (ROD) for the Final Trail Management Plan/ Environmental Impact Statement (Plan/EIS), Cuyahoga Valley... 1, the no-action alternative, the trails, authorized uses, and facilities addressed in this Plan/EIS...

  20. Artificial neural network based gynaecological image-guided adaptive brachytherapy treatment planning correction of intra-fractional organs at risk dose variation.

    PubMed

    Jaberi, Ramin; Siavashpour, Zahra; Aghamiri, Mahmoud Reza; Kirisits, Christian; Ghaderi, Reza

    2017-12-01

    Intra-fractional organs at risk (OARs) deformations can lead to dose variation during image-guided adaptive brachytherapy (IGABT). The aim of this study was to modify the final accepted brachytherapy treatment plan to dosimetrically compensate for these intra-fractional organs-applicators position variations and, at the same time, fulfilling the dosimetric criteria. Thirty patients with locally advanced cervical cancer, after external beam radiotherapy (EBRT) of 45-50 Gy over five to six weeks with concomitant weekly chemotherapy, and qualified for intracavitary high-dose-rate (HDR) brachytherapy with tandem-ovoid applicators were selected for this study. Second computed tomography scan was done for each patient after finishing brachytherapy treatment with applicators in situ. Artificial neural networks (ANNs) based models were used to predict intra-fractional OARs dose-volume histogram parameters variations and propose a new final plan. A model was developed to estimate the intra-fractional organs dose variations during gynaecological intracavitary brachytherapy. Also, ANNs were used to modify the final brachytherapy treatment plan to compensate dosimetrically for changes in 'organs-applicators', while maintaining target dose at the original level. There are semi-automatic and fast responding models that can be used in the routine clinical workflow to reduce individually IGABT uncertainties. These models can be more validated by more patients' plans to be able to serve as a clinical tool.

  1. Dose as a Tool for Planning and Implementing Community-Based Health Strategies.

    PubMed

    Kuo, Elena S; Harner, Lisa T; Frost, Madeline C; Cheadle, Allen; Schwartz, Pamela M

    2018-05-01

    A major challenge in community-based health promotion is implementing strategies that could realistically improve health at the population level. Population dose methodology was developed to help understand the combined impact of multiple strategies on population-level health behaviors. This paper describes one potential use of dose: as a tool for working collaboratively with communities to increase impact when planning and implementing community-level initiatives. Findings are presented from interviews conducted with 11 coordinators who used dose for planning and implementing local efforts with community coalitions. During early-stage planning, dose was used as a tool for strategic planning, and as a framework to build consensus among coalition partners. During implementation, a dose lens was used to revise strategies to increase their reach (the number of people exposed to the intervention) or strength (the relative change in behavior for each exposed person) to create population-level impact. A case study is presented, illustrating how some community coalitions and evaluators currently integrate dose into the planning and implementation of place-based healthy eating and active living strategies. Finally, a planning checklist was developed for program coordinators and evaluators. This article is part of a supplement entitled Building Thriving Communities Through Comprehensive Community Health Initiatives, which is sponsored by Kaiser Permanente, Community Health. Copyright © 2018 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  2. Evaluation of Environmental Information Products for Search and Rescue Optimal Planning System (SAROPS) - Version for Public Release

    DTIC Science & Technology

    2008-02-01

    is called EFS-POM. EFS-POM is forced by surface atmospheric forcing (wind, heating / cooling , sea level pressure) and by boundary forcing derived from...Peter Olsson, University of Alaska Anchorage. Heating and cooling is given by the climatological monthly heat flux from COADS (Comprehensive Ocean...Environmental Information Products for Search and Rescue Optimal Planning System (SAROPS) - Version for Public Release FINAL REPORT February

  3. A Study of Alternatives for Disseminating Knowledge and Planning for Civil Defense Education Among School Age Children--12-14 Years. Final Report.

    ERIC Educational Resources Information Center

    Hutchins, C. L.; And Others

    A description is given of alternative goals and plans for introducing a program for civil defense readiness in grades 7-9. This program is designed to train young people in survival skills for disasters, both natural and man-made. While emphasis is placed on children at the junior high school level, an outline is provided for extending such…

  4. Final HAZMAT safety and security field operational test : public sector detailed test plans

    DOT National Transportation Integrated Search

    2004-02-03

    Coordination and information sharing among law enforcement and emergency response agencies at the local, state, and national level is a constant challenge. Often, the inability to effectively gather and distribute information among public agencies is...

  5. Current Status and Future Plans of the NEON Airborne Observation Platform (AOP): Data Products, Observatory Requirements and Opportunities for the Community

    NASA Astrophysics Data System (ADS)

    Petroy, S. B.; Leisso, N.; Goulden, T.; Gulbransen, T.

    2016-12-01

    The National Ecological Observatory Network (NEON) is a continental-scale ecological observation platform designed to collect and disseminate data that contributes to understanding and forecasting the impacts of climate change, land use change, and invasive species on ecology. NEON will collect in-situ and airborne data over 81 sites across the US, including Alaska, Hawaii, and Puerto Rico. The Airborne Observation Platform (AOP) group within the NEON project operates a payload suite that includes a waveform LiDAR, imaging spectrometer (NIS) and high resolution RGB camera. Data from this sensor suite will be collected annually over each site and processed into a set of standard data products, generally following the processing levels used by NASA (Level 1 through Level 3). We will present a summary of the first operational flight campaign (2016), where AOP flew 42 of the 81 planned NEON sites, our operational plans for 2017, and how we will ramp up to full operations by 2018. We will also describe the final set of AOP data products to be delivered as part of NEON construction and those field (observational) data products collected concurrently on the ground, that may be used to support validation efforts of algorithms for deriving vegetation characteristics from airborne data (e.g. Plant foliar physical/chemical properties, Digital Hemispherical Photos, Plant Diversity, etc.). Opportunities for future enhancements to data products or algorithms will be facilitated via NEON's cyberinfrastructure, which is designed to support wrapping/integration of externally-developed code. And finally, we will present NEON's plans for the third AOP Sensor Suite as an assignable asset and the intent of NSF to provide research opportunities to the community for developing higher level AOP data products that were removed from the NEON project in 2015.

  6. 40 CFR 70.4 - State program submittals and transition.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...

  7. 40 CFR 70.4 - State program submittals and transition.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...

  8. 40 CFR 70.4 - State program submittals and transition.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... determine insignificant activities or emission levels for purposes of determining complete applications... any permit application, compliance plan, permit, and monitoring and compliance, certification report... take final action on an application for a permit, permit renewal, or permit revision within the time...

  9. 77 FR 12877 - Record of Decision for the General Management Plan/Abbreviated Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Decision for the General Management Plan/Abbreviated Final Environmental Impact Statement for New River... Abbreviated Final Environmental Impact Statement for the General Management Plan for New River Gorge National... Record of Decision can be downloaded from the NPS Planning, Environment and Public Comment (PEPC) Web...

  10. Phase IV of Early Restoration | NOAA Gulf Spill Restoration

    Science.gov Websites

    Trustees published the Final Phase IV Early Restoration Plan and Environmental Assessments. The plan habitats. Useful Links: Final Phase IV Early Restoration Plan and Environmental Assessments (pdf, 4.8 MB ) Final Phase IV Early Restoration Plan and Environmental Assessments Executive Summary (pdf, 729 KB

  11. Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.

    PubMed

    2000-03-23

    This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage.

  12. 75 FR 57059 - Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N175; 61130-1115-0000 F2] Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and Final... Department of Natural Resources and Conservation (DNRC) a Final Habitat Conservation Plan (HCP) and prepared...

  13. B-70 Aircraft Study. Volume 1

    NASA Technical Reports Server (NTRS)

    Johnson, V. T.

    1972-01-01

    This Phase 2 final report for the B-70 aircraft study contains the data location matrix, which provides a summary of the major cost, schedule, and technical items provided in the report; work breakdown structure; cost definitions; and B-70 program level summary data. The Phase 2 objective was to provide the B-70 aircraft data in accordance with the approved study plan. Several minor modifications to the original plan have been made as the result of the Phase 2 effort.

  14. [Medical supply planning : dynamic registry of physicians, sixth reform of the State and numerus clausus].

    PubMed

    Benahmed, N; De Wever, A; Pirson, M

    2017-01-01

    The last few years have seen major changes in the Belgian medical planning. The paper aims to describe them and to assess how they will affect the medical demography. Grey literature review and federal and federated entities legislation summary. A new dynamic register allows a better knowledge of medical workforce in all sectors of labour market. Recent legislation evolutions induce fragmentation of competences related to human resource for health planning : federal authorities are responsive for the fixation of number of GP and specialists and community authorities for registration of health professionals and fixation of sub-quotas in different branches of specialised medicine. Finally, the French Community has setting up a multiple selection system of medical students that have to past an 'orientation test', a possible reorientation after January examinations and then a numerus fixus at the end of the first academic year. Dynamic register improves the knowledge of medical workforce repartition. However, the assessment of its volume shows methodological limitations. From an operational viewpoint, the fragmentation of competences will ask coordination effort from all authority levels to avoid impairment in planning process. Finally, French Community has to consider evaluation and ambitious revision of medical workforce planning in their region.

  15. Artificial neural network based gynaecological image-guided adaptive brachytherapy treatment planning correction of intra-fractional organs at risk dose variation

    PubMed Central

    Jaberi, Ramin; Aghamiri, Mahmoud Reza; Kirisits, Christian; Ghaderi, Reza

    2017-01-01

    Purpose Intra-fractional organs at risk (OARs) deformations can lead to dose variation during image-guided adaptive brachytherapy (IGABT). The aim of this study was to modify the final accepted brachytherapy treatment plan to dosimetrically compensate for these intra-fractional organs-applicators position variations and, at the same time, fulfilling the dosimetric criteria. Material and methods Thirty patients with locally advanced cervical cancer, after external beam radiotherapy (EBRT) of 45-50 Gy over five to six weeks with concomitant weekly chemotherapy, and qualified for intracavitary high-dose-rate (HDR) brachytherapy with tandem-ovoid applicators were selected for this study. Second computed tomography scan was done for each patient after finishing brachytherapy treatment with applicators in situ. Artificial neural networks (ANNs) based models were used to predict intra-fractional OARs dose-volume histogram parameters variations and propose a new final plan. Results A model was developed to estimate the intra-fractional organs dose variations during gynaecological intracavitary brachytherapy. Also, ANNs were used to modify the final brachytherapy treatment plan to compensate dosimetrically for changes in ‘organs-applicators’, while maintaining target dose at the original level. Conclusions There are semi-automatic and fast responding models that can be used in the routine clinical workflow to reduce individually IGABT uncertainties. These models can be more validated by more patients’ plans to be able to serve as a clinical tool. PMID:29441094

  16. Information and transportation choices, long- and short-term, that link sustainability and livability : USDOT Region V Regional University Transportation Center final report.

    DOT National Transportation Integrated Search

    2016-12-16

    Transportation plans and projects are typically evaluated, both prospectively and retrospectively, with metrics of mobility, notably highway level of service. This practice implicitly treats mobility improvements as desirable. Yet mobility improvemen...

  17. Mainstreaming climate change adaptation strategies into New York State Department of Transportation's operations : final report.

    DOT National Transportation Integrated Search

    2011-10-31

    This study identifies climate change adaptation strategies and recommends ways of mainstreaming them into planned actions, including legislation, policies, programs and projects in all areas and at all levels within the New York State Department of T...

  18. Decommissioning of the Northrop TRIGA reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cozens, George B.; Woo, Harry; Benveniste, Jack

    1986-07-01

    An overview of the administrative and operational aspects of decommissioning and dismantling the Northrop Mark F TRIGA Reactor, including: planning and preparation, personnel requirements, government interfacing, costs, contractor negotiations, fuel shipments, demolition, disposal of low level waste, final survey and disposition of the concrete biological shielding. (author)

  19. Environmental Impact Analysis Process. Volume 3. Preliminary Final Environmental Impact Statement Construction and Operation of Space Launch Complex 7

    DTIC Science & Technology

    1989-10-23

    817) 824-5606. Reelfoot Lake Water Level believes that the proposed timber EIS No. 890197. Final, USA. UT, Tooele Management Plan. Implementation...2: Incidenial lake erit The potential need for an incidental take permit is discussed in Section 4.4.1, Regional Environment. Comment No. 3...and Crow Indian Tribes. Yellowstone, E02, Lake Catamount ResortAvailability Big Horn and Rosebud Counties, MT, Construction. Special Use Permit

  20. Director, Operational Test and Evaluation

    DTIC Science & Technology

    2007-12-01

    important, and all – collectively – are necessary to properly set requirements, incentivize industry, oversee system design and development, and finally...evaluation planning which defines testing required for all system-level evaluation. • Enable access to all system-level test data by government DT...responsible for sustainment cost estimates, and with the OTAs, to contribute relevant data. As with all new missions, there is a question of resources

  1. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  2. Online survey software as a data collection tool for medical education: A case study on lesson plan assessment.

    PubMed

    Kimiafar, Khalil; Sarbaz, Masoumeh; Sheikhtaheri, Abbas

    2016-01-01

    Background: There are no general strategies or tools to evaluate daily lesson plans; however, assessments conducted using traditional methods usually include course plans. This study aimed to evaluate the strengths and weaknesses of online survey software in collecting data on education in medical fields and the application of such softwares to evaluate students' views and modification of lesson plans. Methods: After investigating the available online survey software, esurveypro was selected for assessing daily lesson plans. After using the software for one semester, a questionnaire was prepared to assess the advantages and disadvantages of this method and students' views in a cross-sectional study. Results: The majority of the students (51.7%) rated the evaluation of classes per session (lesson plans) using the online survey as useful or very useful. About 51% (n=36) of the students considered this method effective in improving the management of each session, 67.1% (n=47) considered it effective in improving the management of sessions for the next semester, and 51.4% (n=36) said it had a high impact on improving the educational content of subsequent sessions. Finally, 61.4% (n=43) students expressed high and very high levels of satisfaction with using an online survey at each session. Conclusion: The use of online surveys may be appropriate to improve lesson plans and educational planning at different levels. This method can be used for other evaluations and for assessing people's opinions at different levels of an educational system.

  3. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  4. Wind-energy Science, Technology and Research (WindSTAR) Consortium: Curriculum, Workforce Development, and Education Plan Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manwell, James

    2013-03-19

    The purpose of the project is to modify and expand the current wind energy curriculum at the University of Massachusetts Amherst and to develop plans to expand the graduate program to a national scale. The expansion plans include the foundational steps to establish the American Academy of Wind Energy (AAWE). The AAWE is intended to be a cooperative organization of wind energy research, development, and deployment institutes and universities across North America, whose mission will be to develop and execute joint RD&D projects and to organize high-level science and education in wind energy

  5. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Monocacy National Battlefield

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... DEPARTMENT OF THE INTERIOR National Park Service Final Environmental Impact Statement for the... Interior. ACTION: Notice of Availability of the Final Environmental Impact Statement for the General... Environmental Impact Statement for the General Management Plan for Monocacy National Battlefield. The plan will...

  6. 75 FR 36551 - State Highway-Rail Grade Crossing Action Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ...-0032; Notice No. 5] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Final rule. SUMMARY: This final... three years, to develop State highway-rail grade crossing action plans. The final rule addresses the...

  7. Local Implementation of Performance-Based Curriculum. Final Report.

    ERIC Educational Resources Information Center

    Smalley, Shirley

    An Indiana curriculum project involving the New Castle Area Vocational School and the Indiana Vocational Technical College Regions 6 and 8 addressed the need for establishing an articulation plan to provide for vertical movement of vocational students from secondary to postsecondary levels. Major objectives were (1) development and implementation…

  8. Focused Feasibility Study Final Field Sampling Plan

    DTIC Science & Technology

    1993-10-01

    baseline of groundwater chemistry prior to commencing additional environmental investigations of the area. Work for Phase I of the FFS is designed lo...investigations and remedial feasibility investigations at Beach Point. The groundwater data will also be used to aid in the design of any groundwater extraction...approved laboratories. The analytical data will be the equivalent of EPA Level IV data. This level of data quality has been established for environmental

  9. Final Report of the Blue Ribbon Commission on Postsecondary Educational Attainment. State of Maine, 120th Legislature, First Regular Session.

    ERIC Educational Resources Information Center

    Elliott, David C.

    In response to growing concern about the impact on economic prosperity resulting from the low level of higher educational attainment in Maine, two bills calling for study of that issue were introduced in the 120th Maine Legislature. A commission was created to develop a plan to improve the state's level of higher educational attainment. This…

  10. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0003-422] Coral Reef Restoration Plan... for the Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National... availability of a Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan (Plan...

  11. 77 FR 37432 - Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ...-FF03E00000] Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of... Springfield Plateau Regional Restoration Plan (Plan) and Environmental Assessment and Finding of No... Springfield Plateau Regional Restoration Plan and Environmental Assessment (77 FR 1717). The public comment...

  12. Cadastre (forest maps) and spatial land uses planning, strategic tool for sustainable development

    NASA Astrophysics Data System (ADS)

    Drosos, Vasileios C.

    2014-08-01

    The rise in the living standards of the Greeks created, especially since 1970, along with other needs and the need for second or holiday home since 1990 after finding the first house on the outskirts of large urban centers. Trying to find land for the creation of new resorts or new type of permanent residences (maisonettes with or without garden, depending on the financial position of each) had the painful consequence of wasteful and uncontrolled use of land, without a program, without the fundamental rules of land planning and the final creation was usually unsightly buildings. The costs were to pay as usually the forest rural lands. The national spatial planning of land use requires that we know the existing land uses in this country, and based on that we can design and decide their land uses on the future in a rational way. On final practical level, this planning leads to mark the boundaries of specific areas of land that are permitted and may change uses. For this reason, one of the most valuable "tools" of that final marking the boundaries is also the forest maps. The paper aims the investigation to determine the modern views on the issues of Cadastre and Land Management with an ulterior view to placing the bases for creating a building plan of an immediate completion of forest maps. Sustainable development as a term denoting a policy of continued economic and social development that does not involve the destruction of the environment and natural resources, but rather guarantees their rational viability.

  13. 77 FR 52054 - Notice of Availability of the Proposed Bakersfield Resource Management Plan and Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAC06000.L16100000.DQ0000.LXSS095B0000] Notice of Availability of the Proposed Bakersfield Resource Management Plan and Final Environmental... prepared the Proposed Resource Management Plan (RMP) and Final Environmental Impact Statement (EIS) for the...

  14. Effect of the Family and Medical Leave Act on the operation of cafeteria plans. Final regulations.

    PubMed

    2001-10-17

    This document contains final regulations relating to cafeteria plans that reflect changes made by the Family and Medical Leave Act of 1993 (Act). The final regulations provide the public with guidance needed to comply with the Act and affect employees who participate in cafeteria plans.

  15. 78 FR 44592 - Final General Management Plan, Final Wilderness Study, and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... General Management Plan and Wilderness Study (Final EIS/GMP/WS) for Fort Pulaski National Monument... national monument, the Final EIS/GMP/WS will guide the management of the national monument over the next 20... publication of the Environmental Protection Agency's Notice of Availability of the Final EIS/GMP/WS in the...

  16. Task-level robot programming: Integral part of evolution from teleoperation to autonomy

    NASA Technical Reports Server (NTRS)

    Reynolds, James C.

    1987-01-01

    An explanation is presented of task-level robot programming and of how it differs from the usual interpretation of task planning for robotics. Most importantly, it is argued that the physical and mathematical basis of task-level robot programming provides inherently greater reliability than efforts to apply better known concepts from artificial intelligence (AI) to autonomous robotics. Finally, an architecture is presented that allows the integration of task-level robot programming within an evolutionary, redundant, and multi-modal framework that spans teleoperation to autonomy.

  17. 78 FR 21245 - Continuity of Operations Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  18. 45 CFR 1386.36 - Final disapproval of the State plan or plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON DEVELOPMENTAL DISABILITIES, DEVELOPMENTAL DISABILITIES PROGRAM FORMULA GRANT PROGRAMS Federal Assistance to State Developmental Disabilities Councils § 1386.36 Final disapproval of the State plan or plan...

  19. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    PubMed

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  20. 26 CFR 1.401(a)(5)-1 - Special rules relating to nondiscrimination requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... compensation for A's final 5 plan years is as follows: 1995 plan year $10,500 1994 plan year $20,000 1993 plan... this section, an employee's final pay from the employer as of a plan year is the employee's compensation (as defined in section 414(q)(7)) for the year (ending with or within the 5-plan-year period...

  1. Medicare program; prohibition of midyear benefit enhancements for Medicare Advantage organizations. Final rule.

    PubMed

    2008-07-28

    This final rule prohibits Medicare Advantage (MA) organizations, including organizations offering MA plans to employer and union group health plan sponsors, from making midyear changes to nonprescription drug benefits, premiums, and cost-sharing submitted in their approved bids for a given contract year. This final rule also clarifies that MA organizations offering certain kinds of plans restricted to employer and union group health plan sponsors and not open to general enrollment may continue to offer benefit enhancements as they do currently, through means other than midyear benefit enhancements (MYBEs). Programs of all-inclusive care for elderly (PACE) are not subject to the provisions of this final rule and may continue to offer enhanced benefits as specified in our guidance for PACE plans.

  2. Radiological Sciences Discipline Advisory Group Final Report. Kentucky Allied Health Project.

    ERIC Educational Resources Information Center

    Kentucky Council on Public Higher Education, Frankfort.

    Radiological sciences education in Kentucky and articulation within this field are examined, based on the Kentucky Allied Health Project (KAHP), which designed an articulated statewide system to promote entry and exit of personnel at a variety of educational levels. The KAHP model promotes articulation in learning, planning, and resource…

  3. 75 FR 25288 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... date that the Environmental Protection Agency publishes its Notice of Availability in the Federal... level of protection, restoration, and enhancement to meet the overall needs of the resources, use... Petticoat Peak Area of Critical Environmental Concern (ACEC) to provide protection to unique native plants...

  4. 77 FR 31870 - Final Comprehensive Conservation Plan for the Bowdoin National Wildlife Refuge Complex

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... remaining complex waters do not support a sport fishery due high salinity levels or shallow water depth... addressing the salinity and blowing salts issue on Bowdoin National Wildlife Refuge. The Region 6 Regional... Thibadeau and Alternative 4 for addressing the salinity and blowing salts issue. These preferred...

  5. Instructional Materials in Spanish for Agriculture. Final Report.

    ERIC Educational Resources Information Center

    Mainous, Bruce H.

    A federally funded project to develop Spanish for Agricultural Purposes, a set of instructional materials for agricultural specialists planning to work in Latin America, is reported. The materials are intended for use by individuals with at least a year's college-level study of Spanish. They include: a series of authentic readings, each with an…

  6. Clinical Laboratory Sciences Discipline Advisory Group Final Report. Kentucky Allied Health Project.

    ERIC Educational Resources Information Center

    Kentucky Council on Public Higher Education, Frankfort.

    Education in the clinical laboratory sciences in Kentucky and articulation within the field are examined, based on the Kentucky Allied Health Project (KAHP), which designed an articulated statewide system to promote entry and exit of personnel at a variety of educational levels. The KAHP model promotes articulation in learning, planning, and…

  7. 76 FR 63188 - Hawaii State Plan; Change in Level of Federal Enforcement: Military Installations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... Hawaii, Department of Labor and Industrial Relations, requested in a November 15, 2010 memorandum which... INFORMATION CONTACT: Press inquiries: Frank Meilinger, Office of Communications, OSHA, U.S. Department of... Department of Labor and Industrial Relations. On April 30, 1984, OSHA awarded final approval to the Hawaii...

  8. Online survey software as a data collection tool for medical education: A case study on lesson plan assessment

    PubMed Central

    Kimiafar, Khalil; Sarbaz, Masoumeh; Sheikhtaheri, Abbas

    2016-01-01

    Background: There are no general strategies or tools to evaluate daily lesson plans; however, assessments conducted using traditional methods usually include course plans. This study aimed to evaluate the strengths and weaknesses of online survey software in collecting data on education in medical fields and the application of such softwares to evaluate students' views and modification of lesson plans. Methods: After investigating the available online survey software, esurveypro was selected for assessing daily lesson plans. After using the software for one semester, a questionnaire was prepared to assess the advantages and disadvantages of this method and students’ views in a cross-sectional study. Results: The majority of the students (51.7%) rated the evaluation of classes per session (lesson plans) using the online survey as useful or very useful. About 51% (n=36) of the students considered this method effective in improving the management of each session, 67.1% (n=47) considered it effective in improving the management of sessions for the next semester, and 51.4% (n=36) said it had a high impact on improving the educational content of subsequent sessions. Finally, 61.4% (n=43) students expressed high and very high levels of satisfaction with using an online survey at each session. Conclusion: The use of online surveys may be appropriate to improve lesson plans and educational planning at different levels. This method can be used for other evaluations and for assessing people’s opinions at different levels of an educational system. PMID:28491839

  9. AutoLock: a semiautomated system for radiotherapy treatment plan quality control

    PubMed Central

    Lowe, Matthew; Hardy, Mark J.; Boylan, Christopher J.; Whitehurst, Philip; Rowbottom, Carl G.

    2015-01-01

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock. PACS number: 87.55.Qr PMID:26103498

  10. AutoLock: a semiautomated system for radiotherapy treatment plan quality control.

    PubMed

    Dewhurst, Joseph M; Lowe, Matthew; Hardy, Mark J; Boylan, Christopher J; Whitehurst, Philip; Rowbottom, Carl G

    2015-05-08

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock.

  11. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  12. Model-Unified Planning and Execution for Distributed Autonomous System Control

    NASA Technical Reports Server (NTRS)

    Aschwanden, Pascal; Baskaran, Vijay; Bernardini, Sara; Fry, Chuck; Moreno, Maria; Muscettola, Nicola; Plaunt, Chris; Rijsman, David; Tompkins, Paul

    2006-01-01

    The Intelligent Distributed Execution Architecture (IDEA) is a real-time architecture that exploits artificial intelligence planning as the core reasoning engine for interacting autonomous agents. Rather than enforcing separate deliberation and execution layers, IDEA unifies them under a single planning technology. Deliberative and reactive planners reason about and act according to a single representation of the past, present and future domain state. The domain state behaves the rules dictated by a declarative model of the subsystem to be controlled, internal processes of the IDEA controller, and interactions with other agents. We present IDEA concepts - modeling, the IDEA core architecture, the unification of deliberation and reaction under planning - and illustrate its use in a simple example. Finally, we present several real-world applications of IDEA, and compare IDEA to other high-level control approaches.

  13. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan Section 13.6.3, Revision 1 on Physical Security--Early... NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.3, Revision 1 on Physical Security...

  14. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan Section 13.6.2, Revision 1 on Physical Security--Design... issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.2, Revision 1 on Physical Security--Design Certification...

  15. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan, Section 13.6.1, Revision 1 on Physical Security... Availability. SUMMARY: The NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.1, Revision 1 on...

  16. Environmental Testing Philosophy for a Sandia National Laboratories' Small Satellite Project - A Retrospective

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CAP,JEROME S.

    2000-08-24

    Sandia has recently completed the flight certification test series for the Multi-Spectral Thermal Imaging satellite (MTI), which is a small satellite for which Sandia was the system integrator. A paper was presented at the 16th Aerospace Testing Seminar discussing plans for performing the structural dynamics certification program for that satellite. The testing philosophy was originally based on a combination of system level vibroacoustic tests and component level shock and vibration tests. However, the plans evolved to include computational analyses using both Finite Element Analysis and Statistical Energy Analysis techniques. This paper outlines the final certification process and discuss lessons learnedmore » including both things that went well and things that should/could have been done differently.« less

  17. Business planning health-check questionnaire: a survey of first, second, third and fourth wave NHS Trusts.

    PubMed

    Bennett, A R; Banks, J M

    1999-02-01

    This paper reports the results of primary research which was carried out in July 1995 with respect to business planning within first, second, third and fourth wave National Health Service (NHS) Trusts. The purpose of the research was to examine current practice in these Trusts in three areas--namely, the levels of responsibility for business planning in general, the business planning processes applied by these Trusts, and the tools and techniques used by business planning managers in the compilation of business plans. The research, based on a 37.5% response rate, concludes that, as a general rule, business planning in first, second, third and fourth wave NHS Trusts tends to be a board-level activity, where senior managers have a job title which reflects this function. Secondly, the research shows that by far the greatest challenge for Trusts lies in the external marketplace. In areas such as patient needs forecasting, competitive (Trust) intelligence, purchaser and general practice fundholder requirements, data are difficult to acquire. Finally, the evidence suggests that there is a significant gap between what is regarded as business planning practice in the NHS and what is actually applied as best practice. The report concludes that business planning in the NHS Trusts sampled appears to be an art rather than a science, and that many assumptions made by business planning managers are founded on qualitative information rather than on specific, measurable data derived from the external and internal market.

  18. A deterministic aggregate production planning model considering quality of products

    NASA Astrophysics Data System (ADS)

    Madadi, Najmeh; Yew Wong, Kuan

    2013-06-01

    Aggregate Production Planning (APP) is a medium-term planning which is concerned with the lowest-cost method of production planning to meet customers' requirements and to satisfy fluctuating demand over a planning time horizon. APP problem has been studied widely since it was introduced and formulated in 1950s. However, in several conducted studies in the APP area, most of the researchers have concentrated on some common objectives such as minimization of cost, fluctuation in the number of workers, and inventory level. Specifically, maintaining quality at the desirable level as an objective while minimizing cost has not been considered in previous studies. In this study, an attempt has been made to develop a multi-objective mixed integer linear programming model that serves those companies aiming to incur the minimum level of operational cost while maintaining quality at an acceptable level. In order to obtain the solution to the multi-objective model, the Fuzzy Goal Programming approach and max-min operator of Bellman-Zadeh were applied to the model. At the final step, IBM ILOG CPLEX Optimization Studio software was used to obtain the experimental results based on the data collected from an automotive parts manufacturing company. The results show that incorporating quality in the model imposes some costs, however a trade-off should be done between the cost resulting from producing products with higher quality and the cost that the firm may incur due to customer dissatisfaction and sale losses.

  19. Arizona Air Quality State Implementation Plans; Final Approval; Douglas, Arizona; Second 10-Year Sulfur Dioxide Maintenance Plan

    EPA Pesticide Factsheets

    EPA is taking final rulemaking action to approve, as part of the State Implementation Plan (SIP) for the State of Arizona, the second 10-year maintenance plan for the Douglas maintenance area for the 1971 National Ambient Air Quality Standards for SO2.

  20. Improved Virtual Planning for Bimaxillary Orthognathic Surgery.

    PubMed

    Hatamleh, Muhanad; Turner, Catherine; Bhamrah, Gurprit; Mack, Gavin; Osher, Jonas

    2016-09-01

    Conventional model surgery planning for bimaxillary orthognathic surgery can be laborious, time-consuming and may contain potential errors; hence three-dimensional (3D) virtual orthognathic planning has been proven to be an efficient, reliable, and cost-effective alternative. In this report, the 3D planning is described for a patient presenting with a Class III incisor relationship on a Skeletal III base with pan facial asymmetry complicated by reverse overjet and anterior open bite. A combined scan data of direct cone beam computer tomography and indirect dental scan were used in the planning. Additionally, a new method of establishing optimum intercuspation by scanning dental casts in final occlusion and positioning it to the composite-scans model was shown. Furthermore, conventional model surgery planning was carried out following in-house protocol. Intermediate and final intermaxillary splints were produced following the conventional method and 3D printing. Three-dimensional planning showed great accuracy and treatment outcome and reduced laboratory time in comparison with the conventional method. Establishing the final dental occlusion on casts and integrating it in final 3D planning enabled us to achieve the best possible intercuspation.

  1. Final rules relating to use of electronic communication and recordkeeping technologies by employee pension and welfare benefit plans. Notice of final rulemaking.

    PubMed

    2002-04-09

    This document contains final rules under Title I of the Employee Retirement Income Security Act of 1974, as amended (ERISA), concerning the disclosure of certain employee benefit plan information through electronic media, and the maintenance and retention of employee benefit plan records in electronic form. The rules establish a safe harbor pursuant to which all pension and welfare benefit plans covered by Title I of ERISA may use electronic media to satisfy disclosure obligations under Title I of ERISA. The rules also provide standards concerning the use of electronic media in the maintenance and retention of records required by sections 107 and 209 of ERISA. The rules affect employee pension and welfare benefit plans, including group health plans, plan sponsors, administrators and fiduciaries, and plan participants and beneficiaries.

  2. Superfund record of decision (EPA Region 3): Stanley Kessler Superfund Site, King of Prussia, PA, September 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-29

    This decision document presents the final selected remedial action for the Stanley Kessler Superfund Site (the Site). The selected remedy for the Site will restore contaminated ground water to its beneficial use by cleaning up the ground water to background levels as established by EPA or the appropriate Maximum Contaminant Levels or non-zero Maximum Contaminant Level Goals established under the Federal Safe Drinking Water Act whichever is more stringent. The selected remedy is the only planned action for the Site.

  3. Seattle To Portland Inter-City ITS Corridor Study And Communications Plan, Final Report

    DOT National Transportation Integrated Search

    1996-03-01

    THIS DOCUMENT IS THE FINAL REPORT PRESENTING THE SEATTLE TO PORTLAND INTELLIGENT TRANSPORTATION SYSTEM (ITS) EARLY DEPLOYMENT PLAN. THE FINAL REPORT SYNTHESIZES INFORMATION FROM TECHNICAL MEMORANDUMS 1 THROUGH 5; INCLUDING EXISTING AND FUTURE CONDITI...

  4. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1994 through November 30, 1995. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  5. Project Volunteer Power: Volunteers Serving the Job Needs of the Handicapped. Final Report.

    ERIC Educational Resources Information Center

    President's Committee on Employment of the Handicapped, Washington, DC.

    The report covers the activities, results, and lessons learned in a project to test a new approach in developing greater opportunities in employment of the physically handicapped, mentally retarded, and mentally restored by harnessing the resources of leading volunteer women's organizations at the local level on a practical, planned basis. Project…

  6. 76 FR 16637 - J.N. “Ding” Darling NWR, Lee County, FL; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ..., quantity, and timing of flows and from climate change and sea level rise. Resource protection will be... designations, including Wilderness Area, Research Natural Area, Marine Protected Area, Florida Important Bird Area, and Outstanding Florida Water. Annual visitation to the refuge exceeds 700,000. We announce our...

  7. Rotations

    Treesearch

    John R. Jones; Wayne D. Shepperd

    1985-01-01

    The rotation, in forestry, is the planned number of years between formation of a crop or stand and its final harvest at a specified stage of maturity (Ford-Robertson 1971). The rotation used for many species is the age of culmination of mean usable volume growth [net mean annual increment (MAI)]. At that age, usable volume divided by age reaches its highest level. That...

  8. A Technical Description of the Officer Procurement Model (TOPOPS). Final Report.

    ERIC Educational Resources Information Center

    Akman, Allan; And Others

    The Total Objective Plan for the Officer Procurement System (TOPOPS) is an aggregate-level, computer-based model of the Air Force Officer procurement system developed to operate on the UNIVAC 1108 system. It is designed to simulate officer accession and training and achieve optimal solutions in terms of either cost minimization or accession…

  9. People, Planning and Budgets. Final Report and Recommendations of the School Effectiveness Project.

    ERIC Educational Resources Information Center

    TDR Associates, Inc., Newton, MA.

    In 1970, boarding school enrollments were leveling off and inflationary tremors beginning to register in the financial seismographs of most schools. Recently, the school survival issue has begun to emerge as a subject for serious open debate and private speculation. This handbook advances the ideas that for shortrun survival, many schools will…

  10. Amendment to the interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Amendment to interim final rules with request for comments.

    PubMed

    2010-11-17

    This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  11. Excavated Soils Management Plan for AOCs 44 and 52, Fort Devens

    DTIC Science & Technology

    1994-05-01

    I FORT DEVENS AOCs 44 AND 52 I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN DATA ITEM A009I I U 20070424310 I CONTRACT DAAA15-91-D-0008 I U.S. ARMY...obselete FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS Prepared for. U.S. Army Enviromnental Center Aberdeen Proving Ground, Maryland...BLANK 3 I I I I I I I I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS TABLE OF CONTENTS 1 Section Title Page No. 1.0

  12. 78 FR 34918 - Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Environmental Management (IDEM) submitted the State Plan on February 27, 2013. The State Plan is consistent with... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9821-1] Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY...

  13. National Institute on Disability and Rehabilitation Research--Notice of Final Long-Range Plan for Fiscal Years 2005-2009. Federal Register, Part III: Department of Education

    ERIC Educational Resources Information Center

    National Archives and Records Administration, 2006

    2006-01-01

    The Assistant Secretary for Special Education and Rehabilitative Services (OSERS) publishes the Final Long-Range Plan (Final Plan) for the National Institute on Disability and Rehabilitation Research (NIDRR) for FY 2005 through 2009. As required by the Rehabilitation Act of 1973, as amended (Act), the Assistant Secretary takes this action to…

  14. Analysis of The Planning Education in the Light of the Contemporary Trends in Planning

    NASA Astrophysics Data System (ADS)

    Husar, Milan; Ceren Varis, Sila; Ondrejicka, Vladimir

    2017-12-01

    This paper examines the way the planning education is taught and examines the recent trends in the curricula of planning education institutions. The introduction of changing economic systems and planning in the field of education is discussed against these changes. Additionally, the evolution in the planner’s role and how it affects the planning education is discussed. The paper is addressing trends and challenges the countries and their planning changes are facing in 21st century. The trends such as increasing globalization, fuzziness of spatial structures and their borders, complexity and uncertainty and the growing interconnectedness of the world are discussed. Another aim is to prepare a common ground, a platform at the university level for scientific cooperation in the field of planning. This study aims at examining the situation of planning in the contemporary world. The identified challenges include the need for more flexibility in planning and planning education, the emergence of innovations and creativity in planners and planning projects, the necessity of promoting soft skills while keeping the existing technical nature of planning and lastly, the need for more interdisciplinary work. The final part of the paper is discussing the future planning education and recommendations on how the schools of planning should reflect these changes.

  15. [Comparison of planning quality and delivery efficiency between volumetric modulated arc therapy and dynamic intensity modulated radiation therapy for nasopharyngeal carcinoma with more than 4 prescribed dose levels].

    PubMed

    Jia, Pengfei; Xu, Jun; Zhou, Xiaoxi; Chen, Jian; Tang, Lemin

    2017-12-01

    The aim of this study is to compare the planning quality and delivery efficiency between dynamic intensity modulated radiation therapy (d-IMRT) and dual arc volumetric modulated arc therapy (VMAT) systematically for nasopharyngeal carcinoma (NPC) patients with multi-prescribed dose levels, and to analyze the correlations between target volumes and plan qualities. A total of 20 patients of NPC with 4-5 prescribed dose levels to achieve simultaneous integrated boost (SIB) treated by sliding window d-IMRT in our department from 2014 to 2015 were re-planned with dual arc VMAT. All optimization objectives for each VMAT plan were as the same as the corresponding d-IMRT plan. The dose parameters for targets and organ at risk (OAR), the delivery time and monitor units (MU) in two sets of plans were compared respectively. The treatment accuracy was tested by three dimensional dose validation system. Finally, the correlations between the difference of planning quality and the volume of targets were discussed. The conform indexes (CIs) of planning target volumes (PTVs) in VMAT plans were obviously high than those in d-IMRT plans ( P < 0.05), but no significant correlations between the difference of CIs and the volume of targets were discovered ( P > 0.05). The target coverage and heterogeneity indexes (HIs) of PTV 1 and PGTV nd and PTV 3 in two sets of plans were consistent. The doses of PTV 2 decreased and HIs were worse in VMAT plans. VMAT could provide better spinal cord and brainstem sparing, but increase mean dose of parotids. The average number of MUs and delivery time for d-IMRT were 3.32 and 2.19 times of that for VMAT. The γ-index (3 mm, 3%) analysis for each plans was more than 97% in COMPASS ® measurement for quality assurance (QA). The results show that target dose coverages in d-IMRT and VMAT plans are similar for NPC with multi-prescribed dose levels. VMAT could improve the the CIs of targets, but reduce the dose to the target volume in neck except for PGTV nd . The biggest advantages of VMAT over d-IMRT are delivery efficiency and QA.

  16. 76 FR 48006 - Limited Federal Implementation Plan; Prevention of Significant Deterioration; California; North...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ... Implementation Plan; Prevention of Significant Deterioration; California; North Coast Unified Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing a limited Federal Implementation Plan (FIP) for the North Coast Unified Air Quality Management...

  17. 29 CFR 1952.313 - Final approval determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 1902. Accordingly, the Hawaii plan was granted final approval and concurrent Federal enforcement... employment in Hawaii. The plan does not cover maritime employment in the private sector; Federal government... effective as operations under the Federal program; to submit plan supplements in accordance with 29 CFR part...

  18. 29 CFR 1952.294 - Final approval determination.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...

  19. 29 CFR 1952.294 - Final approval determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...

  20. Envisioning Cognitive Robots for Future Space Exploration

    NASA Technical Reports Server (NTRS)

    Huntsberger, Terry; Stoica, Adrian

    2010-01-01

    Cognitive robots in the context of space exploration are envisioned with advanced capabilities of model building, continuous planning/re-planning, self-diagnosis, as well as the ability to exhibit a level of 'understanding' of new situations. An overview of some JPL components (e.g. CASPER, CAMPOUT) and a description of the architecture CARACaS (Control Architecture for Robotic Agent Command and Sensing) that combines these in the context of a cognitive robotic system operating in a various scenarios are presented. Finally, two examples of typical scenarios of a multi-robot construction mission and a human-robot mission, involving direct collaboration with humans is given.

  1. The Uncertainties on the GIS Based Land Suitability Assessment for Urban and Rural Planning

    NASA Astrophysics Data System (ADS)

    Liu, H.; Zhan, Q.; Zhan, M.

    2017-09-01

    The majority of the research on the uncertainties of spatial data and spatial analysis focuses on some specific data feature or analysis tool. Few have accomplished the uncertainties of the whole process of an application like planning, making the research of uncertainties detached from practical applications. The paper discusses the uncertainties of the geographical information systems (GIS) based land suitability assessment in planning on the basis of literature review. The uncertainties considered range from index system establishment to the classification of the final result. Methods to reduce the uncertainties arise from the discretization of continuous raster data and the index weight determination are summarized. The paper analyzes the merits and demerits of the "Nature Breaks" method which is broadly used by planners. It also explores the other factors which impact the accuracy of the final classification like the selection of class numbers, intervals and the autocorrelation of the spatial data. In the conclusion part, the paper indicates that the adoption of machine learning methods should be modified to integrate the complexity of land suitability assessment. The work contributes to the application of spatial data and spatial analysis uncertainty research on land suitability assessment, and promotes the scientific level of the later planning and decision-making.

  2. Comparison of treatment plans: a retrospective study by the method of radiobiological evaluation

    NASA Astrophysics Data System (ADS)

    Puzhakkal, Niyas; Kallikuzhiyil Kochunny, Abdullah; Manthala Padannayil, Noufal; Singh, Navin; Elavan Chalil, Jumanath; Kulangarakath Umer, Jamshad

    2016-09-01

    There are many situations in radiotherapy where multiple treatment plans need to be compared for selection of an optimal plan. In this study we performed the radiobiological method of plan evaluation to verify the treatment plan comparison procedure of our clinical practice. We estimated and correlated various radiobiological dose indices with physical dose metrics for a total of 30 patients representing typical cases of head and neck, prostate and brain tumors. Three sets of plans along with a clinically approved plan (final plan) treated by either Intensity Modulated Radiation Therapy (IMRT) or Rapid Arc (RA) techniques were considered. The study yielded improved target coverage for final plans, however, no appreciable differences in doses and the complication probabilities of organs at risk were noticed. Even though all four plans showed adequate dose distributions, from dosimetric point of view, the final plan had more acceptable dose distribution. The estimated biological outcome and dose volume histogram data showed least differences between plans for IMRT when compared to RA. Our retrospective study based on 120 plans, validated the radiobiological method of plan evaluation. The tumor cure or normal tissue complication probabilities were found to be correlated with the corresponding physical dose indices.

  3. Robotic-Arm Assisted Total Knee Arthroplasty Demonstrated Greater Accuracy and Precision to Plan Compared with Manual Techniques.

    PubMed

    Hampp, Emily L; Chughtai, Morad; Scholl, Laura Y; Sodhi, Nipun; Bhowmik-Stoker, Manoshi; Jacofsky, David J; Mont, Michael A

    2018-05-01

    This study determined if robotic-arm assisted total knee arthroplasty (RATKA) allows for more accurate and precise bone cuts and component position to plan compared with manual total knee arthroplasty (MTKA). Specifically, we assessed the following: (1) final bone cuts, (2) final component position, and (3) a potential learning curve for RATKA. On six cadaver specimens (12 knees), a MTKA and RATKA were performed on the left and right knees, respectively. Bone-cut and final-component positioning errors relative to preoperative plans were compared. Median errors and standard deviations (SDs) in the sagittal, coronal, and axial planes were compared. Median values of the absolute deviation from plan defined the accuracy to plan. SDs described the precision to plan. RATKA bone cuts were as or more accurate to plan based on nominal median values in 11 out of 12 measurements. RATKA bone cuts were more precise to plan in 8 out of 12 measurements ( p  ≤ 0.05). RATKA final component positions were as or more accurate to plan based on median values in five out of five measurements. RATKA final component positions were more precise to plan in four out of five measurements ( p  ≤ 0.05). Stacked error results from all cuts and implant positions for each specimen in procedural order showed that RATKA error was less than MTKA error. Although this study analyzed a small number of cadaver specimens, there were clear differences that separated these two groups. When compared with MTKA, RATKA demonstrated more accurate and precise bone cuts and implant positioning to plan. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  4. Is pre-retirement planning always good? An exploratory study of retirement adjustment among Hong Kong Chinese retirees.

    PubMed

    Yeung, Dannii Y

    2013-01-01

    The impacts of four types of pre-retirement planning activities (financial, health, social life, and psychological planning) on retirement adjustment were investigated in a sample of Chinese retirees residing in Hong Kong. This study consisted of two phases of data collection, pre-retirement and post-retirement phases. Pre-retirement planning behaviors and psychological health (including attitudes toward retirement, adjustment to retirement, anxiety toward retirement, psychological well-being (PWB), and psychological distress) six months before and after retirement were measured. The final sample consisted of 90 Hong Kong Chinese retirees. Compared with the pre-retirement phase, retirees exhibited more positive attitudes toward retirement and better adjustment after they had actually retired, whereas their level of anxiety and psychological distress remained low over time. Pre-retirement planning was found to be predictive of changes in psychological health, though its impact was not always positive depending on the type of planning activities. In particular, greater psychological planning was associated with positive attitudes toward retirement and better PWB, whereas more social life planning activities were associated with greater psychological distress. In addition to financial and health planning, psychological planning activities should also be prompted to facilitate a smooth adjustment to retirement.

  5. 75 FR 34669 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland for Transportation Conformity Regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final...

  6. Amendments to Summary Plan Description regulations. Pension and Welfare Benefits Administration, Labor. Final rule.

    PubMed

    2000-11-21

    This document contains a final rule amending the regulations governing the content of the Summary Plan Description (SPD) required to be furnished to employee benefit plan participants and beneficiaries under the Employee Retirement Income Security Act of 1974, as amended (ERISA). These amendments implement information disclosure recommendations of the President's Advisory Commission on Consumer Protection and Quality in the Health Care Industry, as set forth in their November 20, 1997, report, "Consumer Bill of Rights and Responsibilities." Specifically, the amendments clarify benefit, medical provider, and other information required to be disclosed in, or as part of, the SPD of a group health plan and repeal the limited exemption with respect to SPDs of welfare plans providing benefits through qualified health maintenance organizations (HMOs). In addition, this document contains several amendments updating and clarifying provisions relating to the content of SPDs that affect both pension and welfare benefit plans. This document also adopts in final form certain regulations that were effective on an interim basis implementing amendments to ERISA enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA). This final rule will affect employee pension and welfare benefit plans, including group health plans, as well as administrators, fiduciaries, participants and beneficiaries of such plans.

  7. Claims Procedure for Plans Providing Disability Benefits. Final rule.

    PubMed

    2016-12-19

    This document contains a final regulation revising the claims procedure regulations under the Employee Retirement Income Security Act of 1974 (ERISA) for employee benefit plans providing disability benefits. The final rule revises and strengthens the current rules primarily by adopting certain procedural protections and safeguards for disability benefit claims that are currently applicable to claims for group health benefits pursuant to the Affordable Care Act. This rule affects plan administrators and participants and beneficiaries of plans providing disability benefits, and others who assist in the provision of these benefits, such as third-party benefits administrators and other service providers.

  8. Cultural Resource Protection Plan for the Remote-Handled Low-Level Waste Disposal Facility at the Idaho National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pace, Brenda Ringe; Gilbert, Hollie Kae

    2015-05-01

    This plan addresses cultural resource protection procedures to be implemented during construction of the Remote Handled Low Level Waste project at the Idaho National Laboratory. The plan proposes pre-construction review of proposed ground disturbing activities to confirm avoidance of cultural resources. Depending on the final project footprint, cultural resource protection strategies might also include additional survey, protective fencing, cultural resource mapping and relocation of surface artifacts, collection of surface artifacts for permanent curation, confirmation of undisturbed historic canal segments outside the area of potential effects for construction, and/or archaeological test excavations to assess potential subsurface cultural deposits at known culturalmore » resource locations. Additionally, all initial ground disturbing activities will be monitored for subsurface cultural resource finds, cultural resource sensitivity training will be conducted for all construction field personnel, and a stop work procedure will be implemented to guide assessment and protection of any unanticipated discoveries after initial monitoring of ground disturbance.« less

  9. Design and analysis issues of integrated control systems for high-speed civil transports

    NASA Technical Reports Server (NTRS)

    Mccarty, Craig A.; Feather, John B.; Dykman, John R.; Page, Mark A.; Hodgkinson, John

    1992-01-01

    A study was conducted to identify, rank, and define development plans for the critical guidance and control design and analysis issues as related to economically viable and environmentally acceptable high-speed civil transport. The issues were identified in a multistep process. First, pertinent literature on supersonic cruise aircraft was reviewed, and experts were consulted to establish the fundamental characteristics and problems inherent to supersonic cruise aircraft. Next, the advanced technologies and strategies being pursued for the high-speed civil transport were considered to determine any additional unique control problems the transport may have. Finally, existing technologies and methods were examined to determine their capabilities for the design and analysis of high-speed civil transport control systems and to identify the shortcomings and issues. Three priority levels - mandatory, highly beneficial, and desirable - were established. Within each of these levels, the issues were further ranked. Technology development plans for each issue were defined. Each plan contains a task breakdown and schedule.

  10. Pension Reform in China.

    PubMed

    Liu, Tao; Sun, Li

    2016-01-01

    This article analyzes China's pension arrangement and notes that China has recently established a universal non-contributory pension plan covering urban non-employed workers and all rural residents, combined with the pension plan covering urban employees already in place. Further, in the latest reform, China has discontinued the special pension plan for civil servants and integrated this privileged welfare class into the urban old-age pension insurance program. With these steps, China has achieved a degree of universalism and integration of its pension arrangement unprecedented in the non-Western world. Despite this radical pension transformation strategy, we argue that the current Chinese pension arrangement represents a case of "incomplete" universalism. First, its benefit level is low. Moreover, the benefit level varies from region to region. Finally, universalism in rural China has been undermined due to the existence of the "policy bundle." Additionally, we argue that the 2015 pension reform has created a situation in which the stratification of Chinese pension arrangements has been "flattened," even though it remains stratified to some extent.

  11. Patient protection and Affordable Care Act; data collection to support standards related to essential health benefits; recognition of entities for the accreditation of qualified health plans. Final rule.

    PubMed

    2012-07-20

    This final rule establishes data collection standards necessary to implement aspects of section 1302 of the Patient Protection and Affordable Care Act (Affordable Care Act), which directs the Secretary of Health and Human Services to define essential health benefits. This final rule outlines the data on applicable plans to be collected from certain issuers to support the definition of essential health benefits. This final rule also establishes a process for the recognition of accrediting entities for purposes of certification of qualified health plans.

  12. 76 FR 40394 - Final Plan for Fiscal Year 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... DEPARTMENT OF JUSTICE Office of Juvenile Justice and Delinquency Prevention [OJP (OJJDP) Docket No. 1563] Final Plan for Fiscal Year 2011 AGENCY: Office of Juvenile Justice and Delinquency Prevention.... SUMMARY: The Office of Juvenile Justice and Delinquency Prevention is publishing this notice of its Final...

  13. 55th Annual Fuze Conference

    DTIC Science & Technology

    2011-05-26

    concrete plate and compact soil Confirmation: Complete Success both tests The TDD functioned as programmed; traces show entry and exit from each...concrete target and difference in deceleration levels between concrete and soil configuration The final exit & fire signals were generated as planned...Technical Data Package • Determine Process Capability • FMEA Manufacturing • Determine process capability • Cp = ( USL -LSL)/(6*Sigma) • Cpl

  14. 77 FR 23671 - Notice of Availability of the Final Supplemental Environmental Impact Statement for the Disposal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... units, retail (125,000 square feet (sq ft)), research and development (R&D) (2.5 million sq ft... the development as necessary. Alternative 1A (the ``Stadium Plan/No Bridge Alternative'') includes the disposal of HPS by the DoN and its reuse with the same level, land use types, and density of development as...

  15. DeSoto County District Plan for Career Education Development Program. Final Performance Report, January 1 through June 30, 1976.

    ERIC Educational Resources Information Center

    Pelletti, John C.; Dale, John R.

    An evaluation of the DeSoto County, Florida Career Education Project was conducted to determine the effectiveness of career education activities in grades K-12. Project goals emphasized at the elementary level were self-awareness, attitudes/appreciations, and career awareness. Career awareness and attitudes/appreciations were emphasized at the…

  16. 75 FR 72963 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile Organic Compound Emissions From Industrial Solvent Cleaning Operations; Withdrawal of Direct Final Rule AGENCY: Environmental Protection... withdrawing the direct final rule to approve revisions to Maryland's State Implementation Plan (SIP). This SIP...

  17. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Harpers Ferry National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... guidance to park management for administration, development, and interpretation of park resources over the... General Management Plan for Harpers Ferry National Historical Park. SUMMARY: Pursuant to the National... availability of a Final Environmental Impact Statement for the General Management Plan for Harpers Ferry [[Page...

  18. 76 FR 60525 - Final Wilderness and Backcountry Management Plan and Environmental Impact Statement for Isle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... and Environmental Impact Statement for Isle Royale National Park, MI AGENCY: National Park Service... the availability of a Final Wilderness and Backcountry Management Plan and Environmental Impact... the Internet through the NPS Planning, Environment, and Public Comment Web site ( http://parkplanning...

  19. 76 FR 77900 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  20. 76 FR 13883 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  1. 78 FR 16401 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  2. 78 FR 35754 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  3. 77 FR 56770 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  4. Medicaid program; self-directed personal assistance services program State Plan option (cash and counseling). Final rule.

    PubMed

    2008-10-03

    This final rule provides guidance to States that want to administer self-directed personal assistance services through their State Plans, as authorized by the Deficit Reduction Act of 2005. The State plan option allows beneficiaries, through an approved self-directed services plan and budget, to purchase personal assistance services. The rule also provides guidance to ensure beneficiary health and welfare and financial accountability of the State Plan option.

  5. 75 FR 69709 - Office of New Reactors; Notice of Availability of the Final Staff Guidance; Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... the Final Staff Guidance; Standard Review Plan, Section 13.6.6, Revision 0 on Cyber Security Plan... Reports for Nuclear Power Plants,'' Section 13.6.6, Revision 0 on ``Cyber Security Plan'' (Agencywide.... Disposition: On May 13, 2010, the NRC staff issued the proposed Revision 0 on SRP Section 13.6.6 on ``Cyber...

  6. SU-F-T-195: Systematic Constraining of Contralateral Parotid Gland Led to Improved Dosimetric Outcomes for Multi-Field Optimization with Scanning Beam Proton Therapy: Promising Results From a Pilot Study in Patients with Base of Tongue Carcinoma

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, R; Liu, A; Poenisch, F

    Purpose: Treatment planning for Intensity Modulated Proton Therapy (IMPT) for head and neck cancer is time-consuming due to the large number of organs-at-risk (OAR) to be considered. As there are many competing objectives and also wide range of acceptable OAR constraints, the final approved plan may not be most optimal for the given structures. We evaluated the dose reduction to the contralateral parotid by implementing standardized constraints during optimization for scanning beam proton therapy planning. Methods: Twenty-four (24) consecutive patients previously treated for base of tongue carcinoma were retrospectively selected. The doses were 70Gy, 63Gy and 57Gy (SIB in 33more » fractions) for high-, intermediate-, and standard-risk clinical target volumes (CTV), respectively; the treatment included bilateral neck. Scanning beams using MFO with standardized bilateral anterior oblique and PA fields were applied. New plans where then developed and optimized by employing additional contralateral parotid constraints at multiple defined dose levels. Using a step-wise iterative process, the volume-based constraints at each level were then further reduced until known target coverages were compromised. The newly developed plans were then compared to the original clinically approved plans using paired student t-testing. Results: All 24 newly optimized treatment plans maintained initial plan quality as compared to the approved plans, and the 98% prescription dose coverage to the CTV’s were not compromised. Representative DVH comparison is shown in FIGURE 1. The contralateral parotid doses were reduced at all levels of interest when systematic constraints were applied to V10, V20, V30 and V40Gy (All P<0.0001; TABLE 1). Overall, the mean contralateral parotid doses were reduced by 2.26 Gy on average, a ∼13% relative improvement. Conclusion: Applying systematic and volume-based contralateral parotid constraints for IMPT planning significantly reduced the dose at all dosimetric levels for patients with base of tongue cancer.« less

  7. Planning for Bike Share Connectivity to Rail Transit

    PubMed Central

    Griffin, Greg Phillip; Sener, Ipek Nese

    2016-01-01

    Bike sharing can play a role in providing access to transit stations and then to final destinations, but early implementation of these systems in North America has been opportunistic rather than strategic. This study evaluates local intermodal plan goals using trip data and associated infrastructure such as transit stops and bike share station locations in Austin, Texas, and Chicago, Illinois. Bike sharing use data from both cities suggest a weak relationship with existing rail stations that could be strengthened through collaborative, intermodal planning. The study suggests a planning framework and example language that could be tailored to help address the linkage between bike sharing and transit. Rather than an exhaustive study of the practice, this study provides evidence from these two cities that identify opportunities to improve intermodal planning. Cities that are planning or expanding a bike sharing system should consider carefully how to leverage this mode with existing modes of transport. Regardless of a city’s status in implementing a bike sharing system, planners can leverage information on existing transport systems for planning at regional and local levels. PMID:27872554

  8. Cost and Schedule Analytical Techniques Development: Option 1

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1995 through November 30, 1996. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) and the Program Plans and Requirements Officer (PPO2). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  9. 76 FR 38146 - Revision to the Final Principles of Integrated Resource Planning for Use in Resource Acquisition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... DEPARTMENT OF ENERGY Western Area Power Administration Revision to the Final Principles of... Administration (Western) published proposed Principles for Integrated Resource planning (IRP) for use in its... December 6, 1994. After considering public comments on the proposed principles, Western adopted the Final...

  10. 77 FR 39180 - Withdrawal of Direct Final Rule Revising the California State Implementation Plan, South Coast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9690-9] Withdrawal of Direct Final Rule Revising the California State Implementation Plan, South Coast Air Quality Management... State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District...

  11. A Functional Plan for an Illinois Library Telecommunications Network. The Final Report.

    ERIC Educational Resources Information Center

    Calabrese, Alice; And Others

    This final report describes the plan developed by the Northern Illinois Learning Resources Cooperative, a consortium of 44 community colleges and other academic institutions, which was awarded a Library Services and Construction Act (LSCA) Title III planning grant to research the requirements for a statewide electronic network that would provide…

  12. Federal employees health benefits program: discontinuance of health plan in an emergency. Final regulation.

    PubMed

    2007-01-17

    The Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) regulations regarding discontinuance of a health plan to include situations in which a health plan becomes incapacitated, either temporarily or permanently, as the result of a disaster.

  13. 77 FR 65125 - Approval and Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... controls are enforced through the associated SIP rules or Federal Implementation Plans (FIPs). Any purchase... Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure Requirements for the 1997 and... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to approve the State Implementation...

  14. Patient Protection and Affordable Care Act; establishment of the multi-state plan program for the Affordable Insurance Exchanges.

    PubMed

    2013-03-11

    The U.S. Office of Personnel Management (OPM) is issuing a final regulation establishing the Multi-State Plan Program (MSPP) pursuant to the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. Through contracts with OPM, health insurance issuers will offer at least two multi-State plans (MSPs) on each of the Affordable Insurance Exchanges (Exchanges). One of the issuers must be non-profit. Under the law, an MSPP issuer may phase in the States in which it offers coverage over 4 years, but it must offer MSPs on Exchanges in all States and the District of Columbia by the fourth year in which the MSPP issuer participates in the MSPP. This rule aims to balance adhering to the statutory goals of MSPP while aligning its standards to those applying to qualified health plans to promote a level playing field across health plans.

  15. A 6-DOF parallel bone-grinding robot for cervical disc replacement surgery.

    PubMed

    Tian, Heqiang; Wang, Chenchen; Dang, Xiaoqing; Sun, Lining

    2017-12-01

    Artificial cervical disc replacement surgery has become an effective and main treatment method for cervical disease, which has become a more common and serious problem for people with sedentary work. To improve cervical disc replacement surgery significantly, a 6-DOF parallel bone-grinding robot is developed for cervical bone-grinding by image navigation and surgical plan. The bone-grinding robot including mechanical design and low level control is designed. The bone-grinding robot navigation is realized by optical positioning with spatial registration coordinate system defined. And a parametric robot bone-grinding plan and high level control have been developed for plane grinding for cervical top endplate and tail endplate grinding by a cylindrical grinding drill and spherical grinding for two articular surfaces of bones by a ball grinding drill. Finally, the surgical flow for a robot-assisted cervical disc replacement surgery procedure is present. The final experiments results verified the key technologies and performance of the robot-assisted surgery system concept excellently, which points out a promising clinical application with higher operability. Finally, study innovations, study limitations, and future works of this present study are discussed, and conclusions of this paper are also summarized further. This bone-grinding robot is still in the initial stage, and there are many problems to be solved from a clinical point of view. Moreover, the technique is promising and can give a good support for surgeons in future clinical work.

  16. 77 FR 28785 - Revisions to Federal Implementation Plans To Reduce Interstate Transport of Fine Particulate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Ozone AGENCY: Environmental Protection Agency (EPA). ACTION: Withdrawal of direct final rule. SUMMARY... Particulate Matter and Ozone'' as a direct final rule on February 21, 2012. Because the EPA received adverse... Implementation Plans To Reduce Interstate Transport of Fine Particulate Matter and Ozone'' as a direct final rule...

  17. Computerized physician order entry from a chief information officer perspective.

    PubMed

    Cotter, Carole M

    2004-12-01

    Designing and implementing a computerized physician order entry system in the critical care units of a large urban hospital system is an enormous undertaking. With their significant potential to improve health care and significantly reduce errors, the time for computerized physician order entry or physician order management systems is past due. Careful integrated planning is the key to success, requiring multidisciplinary teams at all levels of clinical and administrative management to work together. Articulated from the viewpoint of the Chief Information Officer of Lifespan, a not-for-profit hospital system in Rhode Island, the vision and strategy preceding the information technology plan, understanding the system's current state, the gap analysis between current and future state, and finally, building and implementing the information technology plan are described.

  18. FY16 Strategic Themes White Paper.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leland, Robert W.

    The Science and Technology (S&T) Division 1000 Strategic Plan includes the Themes, Goals, and Actions for FY16. S&T will continue to support the Labs Strategic plan, Mission Areas and Program Management Units by focusing on four strategic themes that align with the targeted needs of the Labs. The themes presented in this plan are Mission Engagement, Bold Outcomes, Collaborative Environment, and the Safety Imperative. Collectively they emphasize diverse, collaborative teams and a self-reliant culture of safety that will deliver on our promise of exceptional service in the national interest like never before. Mission Engagement focuses on increasing collaboration at allmore » levels but with emphasis at the strategic level with mission efforts across the labs. Bold Outcomes seeks to increase the ability to take thoughtful risks with the goal of achieving transformative breakthroughs more frequently. Collaborative environment strives for a self-aware, collaborative working environment that bridges the many cultures of Sandia. Finally, Safety Imperative aims to minimize the risk of serious injury and to continuously strengthen the safety culture. Each of these themes is accompanied by a brief vision statement, several goals, and planned actions to support those goals throughout FY16 and leading into FY17.« less

  19. An area-level model of vehicle-pedestrian injury collisions with implications for land use and transportation planning.

    PubMed

    Wier, Megan; Weintraub, June; Humphreys, Elizabeth H; Seto, Edmund; Bhatia, Rajiv

    2009-01-01

    There is growing awareness among urban planning, public health, and transportation professionals that design decisions and investments that promote walking can be beneficial for human and ecological health. Planners need practical tools to consider the impact of development on pedestrian safety, a key requirement for the promotion of walking. Simple bivariate models have been used to predict changes in vehicle-pedestrian injury collisions based on changes in traffic volume. We describe the development of a multivariate, area-level regression model of vehicle-pedestrian injury collisions based on environmental and population data in 176 San Francisco, California census tracts. Predictor variables examined included street, land use, and population characteristics, including commute behaviors. The final model explained approximately 72% of the systematic variation in census-tract vehicle-pedestrian injury collisions and included measures of traffic volume, arterial streets without transit, land area, proportion of land area zoned for neighborhood commercial and residential-neighborhood commercial uses, employee and resident populations, proportion of people living in poverty and proportion aged 65 and older. We have begun to apply this model to predict area-level change in vehicle-pedestrian injury collisions associated with land use development and transportation planning decisions.

  20. A Health Career Development Program for the Rural High School. Final Report. Research Series No. 56.

    ERIC Educational Resources Information Center

    Rowe, Harold R.

    To provide data for the construction of an 11th or 12th grade health occupations course in a rural high school, an extensive study was made of health needs and health occupation opportunities in the Rocky Mountain region and also of the official state plans for health facilities. From this analysis, the 10 entry-level occupations of ambulance…

  1. Levels-of-growing-stock cooperative study in Douglas-fir: report no. 10—The Hoskins Study, 1963-83.

    Treesearch

    David D. Marshall; John F. Bell; John C. Tappeiner

    1992-01-01

    Results of the Hoskins LOGS study in western Oregon are summarized and management implications discussed through the fifth and final planned treatment period. To age 40 thinnings in this low site I Douglas-fir (Pseudotsuga menziesii (Mirb.) Franco) stand resulted in large increases in diameter growth with reductions in basal area and volume growth...

  2. Evaluation of the Performance Driven Budgeting Initiative of the New York City Board of Education (1997-2000). Final Report [and] Executive Summary.

    ERIC Educational Resources Information Center

    Siegel, Dorothy; Fruchter, Norm

    This report reviews implementation of Phase 1 of the New York City Board of Education's Performance Driven Budgeting (PDB) initiative from 1997-00. This initiative generated a new element in school-based planning for instructional improvement, explicitly linking school-level budgeting and efforts to improve student and school performance. The…

  3. Development and Pilot Test of a Career-Oriented, Peer-Instructional Model in the Office Cluster of Business Occupations. Final Report.

    ERIC Educational Resources Information Center

    Hungerland, Jacklyn; And Others

    This project was conducted to design an instructional model capable of producing high levels of student motivation and proficiency, using the office cluster of business occupations as a vehicle, and to formulate a plan for field implementation and evaluation of the model. To achieve the objectives, project personnel, secondary business teachers,…

  4. Collection and analysis of high-resolution elevation data for the Lincoln Lidar Project, Lincoln, Nebraska, 2004

    USGS Publications Warehouse

    Meyer, P.D.; Greenlee, Susan K.; Gesch, Dean B.; Hubl, Erik J.; Axmann, Ryan N.

    2005-01-01

    The Lincoln Lidar Project was a partnership developed between the U.S. Geological Survey National Center for Earth Resources Observations and Science (EROS), Lancaster County and the city of Lincoln, Nebraska. This project demonstrated a successful planning, collection, analysis and integration of high-resolution elevation information using Light Detection and Ranging, (Lidar) data. This report describes the partnership developed to collect local Lidar data and transform the data into information useable at local to national levels. This report specifically describes project planning, quality assurance, processing, transforming raw Lidar points to useable data layers, and visualizing and disseminating the raw and final products.

  5. 77 FR 34402 - Notice of Availability of the Final Land Use Analysis and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... mining would occur directly beneath the lake itself and no surface mining would take place. East Lynn... Rockspring have approved mining and reclamation plans from the West Virginia Department of Environmental... plan purposes if leases were to be issued and mine plans approved. The Office of Surface Mining...

  6. Preservation Planning Program. Study Report. Iowa State University Library. Final Report.

    ERIC Educational Resources Information Center

    Galejs, John; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…

  7. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  8. 75 FR 36064 - Stellwagen Bank National Marine Sanctuary Final Revised Management Plan: Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... on the Web site: http://stellwagen.noaa.gov . For a hard copy or data CD of the plan contact the sanctuary office at the contact number identified below. DATES: The final revised management plan is available to the public on June 17, 2010. FOR FURTHER INFORMATION CONTACT: Anne Smrcina, Stellwagen Bank...

  9. 75 FR 18113 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... final operations plan, contract, and environmental assessment (EA), and the Final Regulatory Flexibility... fish in a given FY, it must submit an operations plan, sector contract, and EA to NMFS by September 1... National Environmental Policy Act (NEPA), an EA was prepared for each operations plan. All sector EAs are...

  10. 2nd Generation Reusable Launch Vehicle (2G RLV). Revised

    NASA Technical Reports Server (NTRS)

    Matlock, Steve; Sides, Steve; Kmiec, Tom; Arbogast, Tim; Mayers, Tom; Doehnert, Bill

    2001-01-01

    This is a revised final report and addresses all of the work performed on this program. Specifically, it covers vehicle architecture background, definition of six baseline engine cycles, reliability baseline (space shuttle main engine QRAS), and component level reliability/performance/cost for the six baseline cycles, and selection of 3 cycles for further study. This report further addresses technology improvement selection and component level reliability/performance/cost for the three cycles selected for further study, as well as risk reduction plans, and recommendation for future studies.

  11. Group health plans and health insurance issuers relating to coverage of preventive services under the Patient Protection and Affordable Care Act. Final rules.

    PubMed

    2012-02-15

    These regulations finalize, without change, interim final regulations authorizing the exemption of group health plans and group health insurance coverage sponsored by certain religious employers from having to cover certain preventive health services under provisions of the Patient Protection and Affordable Care Act.

  12. 77 FR 24980 - Final General Management Plan and Environmental Impact Statement for the South Unit of Badlands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... the availability of the Final General Management Plan and Environmental Impact Statement (GMP/EIS) for the South Unit of Badlands National Park, South Dakota. DATES: The Final GMP/EIS will remain available... Register by the Environmental Protection Agency. ADDRESSES: Copies of the GMP/EIS are available by request...

  13. 76 FR 73911 - List of Fisheries for 2012

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ...The National Marine Fisheries Service (NMFS) publishes its final List of Fisheries (LOF) for 2012, as required by the Marine Mammal Protection Act (MMPA). The final LOF for 2012 reflects new information on interactions between commercial fisheries and marine mammals. NMFS must classify each commercial fishery on the LOF into one of three categories under the MMPA based upon the level of serious injury and mortality of marine mammals that occurs incidental to each fishery. The classification of a fishery in the LOF determines whether participants in that fishery are subject to certain provisions of the MMPA, such as registration, observer coverage, and take reduction plan (TRP) requirements.

  14. 76 FR 27086 - Final General Management Plan, Wilderness Management Plan, and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... transportation opportunities would be sought to encourage visitors to come to Sand, Basswood, and Oak islands... light stations would be restored or rehabilitated, similar to the Raspberry Island light station. The...

  15. Final Rule: Community Right-To-Know Reporting Requirements Federal Register Notice

    EPA Pesticide Factsheets

    Final reporting thresholds and threshold planning quantity (TPQ) for extremely hazardous substances (EHS) and non-EHS hazardous chemicals, required under Emergency Planning and Community Right-to-Know Act, Superfund Amendments and Reauthorization Act.

  16. [Final Resolutions Adopted by the Conference on Planning of Rural Areas in Europe, 7 October 1978].

    ERIC Educational Resources Information Center

    Council of Europe, Strasbourg (France).

    Two final resolutions were adopted by the Council of Europe at the October 1978 European Conference of Ministers Responsible for Regional Planning. Resolution 1 focused on guidelines for the planning of rural areas in Europe. Strategies and policies called for: a more balanced development which makes the living conditions of different regions as…

  17. 40 CFR 62.14535 - When must I comply with this subpart if I plan to continue operation of my CISWI unit?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule...) You must submit a waste management plan no later than April 5, 2004. (3) You must achieve final... complete retrofit construction of control devices, as specified in the final control plan, so that, if the...

  18. The strategic plan for combating antimicrobial resistance in Gulf Cooperation Council States.

    PubMed

    Balkhy, Hanan H; Assiri, Abdullah M; Mousa, Haifa Al; Al-Abri, Seif S; Al-Katheeri, Huda; Alansari, Huda; Abdulrazzaq, Najiba M; Aidara-Kane, Awa; Pittet, Didier

    2016-01-01

    The Gulf Cooperation Council Center for Infection Control (GCC-IC) has placed the emergence of antimicrobial resistance (AMR) on the top of its agenda for the past four years. The board members have developed the initial draft for the GCC strategic plan for combating AMR in 2014. The strategic plan stems from the WHO mandate to combat AMR at all levels. The need for engaging a large number of stakeholders has prompted the GCC-IC to engage a wider core of professionals in finalizing the plan. A multi-disciplinary group of more than 40 experts were then identified. And a workshop was conducted in Riyadh January 2015 and included, for the first time, representation of relevant ministries and agencies as well as international experts in the field. Participants worked over a period of two and a half days in different groups. International experts shared the global experiences and challenges in addressing human, food, animal, and environmental aspects of controlling AMR. Participants were then divided into 4 groups each to address the human, animal, microbiological and diagnostic, or the environmental aspect of AMR. At the end of the workshop, the strategic plan was revised and endorsed by all participants. The GCC-IC board members then approved it as the strategic plan for AMR. The document produced here is the first GCC strategic plan addressing AMR, which shall be adopted by GCC countries to develop country-based plans and related key performance indicators (KPIs). It is now the role of each country to identify the body that will be accountable for implementing the plan at the country level. Copyright © 2016 King Saud Bin Abdulaziz University for Health Sciences. Published by Elsevier Ltd. All rights reserved.

  19. Medicaid program; correction and reduction plans for intermediate care facilities for the mentally retarded--HCFA. Final rule.

    PubMed

    1991-07-05

    This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.

  20. Career Plans of Final-Year South African Student Teachers: Migration to "Greener Pastures"?

    ERIC Educational Resources Information Center

    de Villiers, J. J. R.

    2017-01-01

    Teacher loss due to migration is a global phenomenon that impacts both developed and developing nations the world over. The aim of this study was to find out about the career plans of final-year South African student teachers. A group of final-year Bachelor of Education student teachers from a South African university responded to a questionnaire…

  1. Final Approval of Arizona Air Plan Revision; Stationary Sources; New Source Review; Ammonia

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning issuance of New Source Review (NSR) permits for stationary sources related to ammonia.

  2. 78 FR 760 - Notice of Availability of the Final General Management Plan/Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... document is available on the internet at the NPS Planning, Environment, and Public Comment Web site at http.../EIS assesses impacts to soil resources, water quality, soundscapes, vegetation and wildlife...

  3. The planning coordinator: A design architecture for autonomous error recovery and on-line planning of intelligent tasks

    NASA Technical Reports Server (NTRS)

    Farah, Jeffrey J.

    1992-01-01

    Developing a robust, task level, error recovery and on-line planning architecture is an open research area. There is previously published work on both error recovery and on-line planning; however, none incorporates error recovery and on-line planning into one integrated platform. The integration of these two functionalities requires an architecture that possesses the following characteristics. The architecture must provide for the inclusion of new information without the destruction of existing information. The architecture must provide for the relating of pieces of information, old and new, to one another in a non-trivial rather than trivial manner (e.g., object one is related to object two under the following constraints, versus, yes, they are related; no, they are not related). Finally, the architecture must be not only a stand alone architecture, but also one that can be easily integrated as a supplement to some existing architecture. This thesis proposal addresses architectural development. Its intent is to integrate error recovery and on-line planning onto a single, integrated, multi-processor platform. This intelligent x-autonomous platform, called the Planning Coordinator, will be used initially to supplement existing x-autonomous systems and eventually replace them.

  4. Environmentally Responsible Aviation (ERA) Project - N+2 Advanced Vehicle Concepts Study and Conceptual Design of Subscale Test Vehicle (STV) Final Report

    NASA Technical Reports Server (NTRS)

    Bonet, John T.; Schellenger, Harvey G.; Rawdon, Blaine K.; Elmer, Kevin R.; Wakayama, Sean R.; Brown, Derrell L.; Guo, Yueping

    2011-01-01

    NASA has set demanding goals for technology developments to meet national needs to improve fuel efficiency concurrent with improving the environment to enable air transportation growth. A figure shows NASA's subsonic transport system metrics. The results of Boeing ERA N+2 Advanced Vehicle Concept Study show that the Blended Wing Body (BWB) vehicle, with ultra high bypass propulsion systems have the potential to meet the combined NASA ERA N+2 goals. This study had 3 main activities. 1) The development of an advanced vehicle concepts that can meet the NASA system level metrics. 2) Identification of key enabling technologies and the development of technology roadmaps and maturation plans. 3) The development of a subscale test vehicle that can demonstrate and mature the key enabling technologies needed to meet the NASA system level metrics. Technology maturation plans are presented and include key performance parameters and technical performance measures. The plans describe the risks that will be reduced with technology development and the expected progression of technical maturity.

  5. The Mental Health Parity and Addiction Equity Act evaluation study: Impact on specialty behavioral health utilization and expenditures among "carve-out" enrollees.

    PubMed

    Ettner, Susan L; M Harwood, Jessica; Thalmayer, Amber; Ong, Michael K; Xu, Haiyong; Bresolin, Michael J; Wells, Kenneth B; Tseng, Chi-Hong; Azocar, Francisca

    2016-12-01

    Interrupted time series with and without controls was used to evaluate whether the federal Mental Health Parity and Addiction Equity Act (MHPAEA) and its Interim Final Rule increased the probability of specialty behavioral health treatment and levels of utilization and expenditures among patients receiving treatment. Linked insurance claims, eligibility, plan and employer data from 2008 to 2013 were used to estimate segmented regression analyses, allowing for level and slope changes during the transition (2010) and post-MHPAEA (2011-2013) periods. The sample included 1,812,541 individuals ages 27-64 (49,968,367 person-months) in 10,010 Optum "carve-out" plans. Two-part regression models with Generalized Estimating Equations were used to estimate expenditures by payer and outpatient, intermediate and inpatient service use. We found little evidence that MHPAEA increased utilization significantly, but somewhat more robust evidence that costs shifted from patients to plans. Thus the primary impact of MHPAEA among carve-out enrollees may have been a reduction in patient financial burden. Copyright © 2016 Elsevier B.V. All rights reserved.

  6. Soviet Style in War.

    DTIC Science & Technology

    1982-04-01

    distant it is from a reality corrupted by indifference. Indecisiveness :3 If one avoids indifference, one may still not arrive at action, for one may...react without delay to all remarks of his superiors. However, in reality this is not the case. From higher levels orders come down, plans for...the final stage of the offensive of [the Voronezh and South- western] Fronts in the winter of 1943... there were virtually no powerful spearheads to

  7. The Assessment of a Model for Determining Community-Based Needs of American Indians with Disabilities through Consumer Involvement in Community Planning and Change. Final Report, 1990.

    ERIC Educational Resources Information Center

    Marshall, Catherine A.; And Others

    This research project sought to identify, at a local community level, the needs and concerns of American Indians with disabilities. The selected target community was Denver, Colorado, and its surrounding metropolitan area. Data were collected through 100 face-to-face interviews with a volunteer population of American Indians with disabilities. The…

  8. How to benefit from the coming RBRVS changes.

    PubMed

    Doherty, R B; Ogrod, E S

    1989-09-01

    The Physician Payment Review Commission's endorsement of the Resource-Based Relative Value Scale (RBRVS) represents a major step in reform of the Medicare payment system. Under this plan, cognitive services finally would be reimbursed at the same level for the work involved. The authors present a closer look at the commission's recommendations and discuss how these might substantially improve payment of primary care physicians. They also describe how to get ready.

  9. Hydrazine Blending and Storage Facility, Interim Response Action Implementation. Final Safety Plan

    DTIC Science & Technology

    1989-08-30

    operators and visitors, will be required to wear a personal hydrazine dosimeter at all times. These will be available from commercial sources and/or the Naval...suspectea or carcinogenic pocen:tal for =an. -- t, :t ha a,,-cn OSL ?:L. Is I pPm or 1.3 mg/m 3 . zo pp=n4p"NIOSI. (1978) hs a oe -nded a ceiling level

  10. Joint Planning and Development Office Work Plan FY10

    DTIC Science & Technology

    2010-01-01

    IPSA ) Division will make refinements to the NextGen Portfolio Analysis. In addition, IPSA will work with the Department of Defense (DoD) to define and...Submitted Interagency Portfolio and Systems Analysis ( IPSA ) DRAFT DoD Portfolio Analysis Criteria BASELINE DoD Portfolio Analysis Criteria DRAFT...WG Work Plan Review Prototype Capability Selected and Defined CHAs Complete Safety Metrics for IPSA Complete FINAL Prototype Report FINAL

  11. A Preservation Program for the Colorado State University Libraries. The Final Report of the ARL/OMS Preservation Planning Program.

    ERIC Educational Resources Information Center

    Green, Stephen; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…

  12. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  13. Soft tissue waxup and mock-up as key factors in a treatment plan: case presentation.

    PubMed

    Viana, Pedro Couto; Correia, André; Neves, Manuel; Kovacs, Zsolt; Neugbauer, Rudiger

    2012-01-01

    Rehabilitation of edentulous spaces in esthetic areas is a challenge to the clinician due to the loss of soft tissues. In these clinical situations, it would be desirable to evaluate and predict the gingival architecture to recover in the oral rehabilitation. To fulfill this need, the diagnostic wax should anticipate the final rehabilitation with the integration of hard and soft tissue. Thus, it is essential to produce a diagnostic waxup that integrates these two components that are simultaneously seeking to recreate the harmony of white and pink esthetic. This diagnostic waxup will be the basis for the creation of the provisional prosthesis and a soft tissue mock-up. After placing the provisional prosthesis in the mouth, the soft tissue mock-up can be applied to assess its esthetic impact at facial and intraoral level. Dentist and patient should objectively assess the appearance of the final result. After approval of this rehabilitation concept, the virtual surgical planning can be performed and the surgical guide can be designed, allowing the treatment to take place. This protocol allows the development of a rigorous treatment plan based on the integration of teeth and gingiva component. The waxup and the soft tissue mock-up play a significant role, since they allow an earlier evaluation of the esthetic result, better prosthetic and surgical planning, and it allows us to anticipate the need for gingiva-colored ceramics use. The authors present a clinical case report of the importance of the wax-up and soft tissue mock-up in the treatment plan.

  14. The strategic skills of business continuity managers: putting business continuity management into corporate long-term planning.

    PubMed

    Wong, Wei Ning Zechariah

    2009-11-01

    Despite its rapid development in the last two decades, business continuity management (BCM) as a discipline and a profession is still regarded by many as an operational entity of management. Two main issues are discussed in this paper: the role of BCM in strategic management and the strategic skills of business continuity managers. These issues are crucial as they represent the role of BCM in high-level corporate management. The paper discusses the importance of BCM in the long-term planning of organisational success and the preservation of future competitiveness. Finally, salient points that underpin the importance of its role in sustaining organisational performance are addressed.

  15. Geospatial analysis based on GIS integrated with LADAR.

    PubMed

    Fetterman, Matt R; Freking, Robert; Fernandez-Cull, Christy; Hinkle, Christopher W; Myne, Anu; Relyea, Steven; Winslow, Jim

    2013-10-07

    In this work, we describe multi-layered analyses of a high-resolution broad-area LADAR data set in support of expeditionary activities. High-level features are extracted from the LADAR data, such as the presence and location of buildings and cars, and then these features are used to populate a GIS (geographic information system) tool. We also apply line-of-sight (LOS) analysis to develop a path-planning module. Finally, visualization is addressed and enhanced with a gesture-based control system that allows the user to navigate through the enhanced data set in a virtual immersive experience. This work has operational applications including military, security, disaster relief, and task-based robotic path planning.

  16. 75 FR 4417 - Wind Cave National Park, Custer County, SD

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... DEPARTMENT OF THE INTERIOR Wind Cave National Park, Custer County, SD AGENCY: National Park... Final Environmental Impact Statement, Wind Cave National Park, Custer County, South Dakota. SUMMARY... Management Plan and Final Environmental Impact Statement (Plan), Wind Cave National Park, Custer County...

  17. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    DOT National Transportation Integrated Search

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  18. Hazardous material transportation safety and security field operational test final detailed test plans : executive summary

    DOT National Transportation Integrated Search

    2003-09-16

    The objective of this Hazardous Material (HazMat) Transportation Safety and Security Field Operational Test (FOT) Final Detailed Test Plans evaluation is to measure the impact of technology solutions on the safety, security, and operational efficienc...

  19. DOE-AVCP Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Latham, Brent

    The purpose of the Cooperative Agreement was based on the mission the two agencies have in common. The Association of Village Council Presidents (AVCP) has been a critical player in accomplishing what Alaskan Native communities need since 1964 with various programs including energy assistance. The AVCP/DOE Partnership enabled AVCP to assist 10 of 56 remote Alaska Native villages in the development of a community-led Community Energy Plan. These plans have empowered the 10 Tribes to address their own energy development needs. The community energy plans that AVCP assisted the communities with identified the community’s energy vision, goals, and a highmore » level project timeline of each goal. The plans also include the technical potential, resource assessment, grant and technical assistance resources. The AVCP/DOE Partnership also enabled AVCP to provide tribal leaders and staff from the 56 Federally-Recognized Tribes with information about the policies and programs of the Department, support regional workshops and forums, and provide directed technical assistance for initial energy project support.« less

  20. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ...This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  1. Hawaii State Plan for Occupational Safety and Health. Final rule.

    PubMed

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  2. Affordable Electro-Magnetic Interference (EMI) Testing on Large Space Vehicles

    NASA Technical Reports Server (NTRS)

    Aldridge, Edward; Curry, Bruce; Scully, Robert

    2015-01-01

    Objective: Perform System-Level EMI testing of the Orion Exploration Flight Test-1 (EFT-1) spacecraft in situ in the Kennedy Space Center's Neil Armstrong Operations & Checkout (O&C) Facility in 6 days. The only way to execute the system-level EMI testing and meet this schedule challenge was to perform the EMI testing in situ in the Final Assembly & System Test (FAST) Cell in a reverberant mode, not the direct illumination mode originally planned. This required the unplanned construction of a Faraday Cage around the vehicle and FAST Cell structure. The presence of massive steel platforms created many challenges to developing an efficient screen room to contain the RF energy and yield an effective reverberant chamber. An initial effectiveness test showed marginal performance, but improvements implemented afterward resulted in the final test performing surprisingly well! The paper will explain the design, the challenges, and the changes that made the difference in performance!

  3. Medicare program; revisions to the Medicare Advantage and Part D prescription drug contract determinations, appeals, and intermediate sanctions processes. Final rule with comment period.

    PubMed

    2007-12-05

    This rule with comment period finalizes the Medicare program provisions relating to contract determinations involving Medicare Advantage (MA) organizations and Medicare Part D prescription drug plan sponsors, including eliminating the reconsideration process for review of contract determinations, revising the provisions related to appeals of contract determinations, and clarifying the process for MA organizations and Part D plan sponsors to complete corrective action plans. In this final rule with comment period, we also clarify the intermediate sanction and civil money penalty (CMP) provisions that apply to MA organizations and Medicare Part D prescription drug plan sponsors, modify elements of their compliance plans, retain voluntary self-reporting for Part D sponsors and implement a voluntary self-reporting recommendation for MA organizations, and revise provisions to ensure HHS has access to the books and records of MA organizations and Part D plan sponsors' first tier, downstream, and related entities. Although we have decided not to finalize the mandatory self-reporting provisions that we proposed, CMS remains committed to adopting a mandatory self-reporting requirement. To that end, we are requesting comments that will assist CMS in crafting a future proposed regulation for a mandatory self-reporting requirement.

  4. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  5. Uncertainty management, spatial and temporal reasoning, and validation of intelligent environmental decision support systems

    USGS Publications Warehouse

    Sànchez-Marrè, Miquel; Gilbert, Karina; Sojda, Rick S.; Steyer, Jean Philippe; Struss, Peter; Rodríguez-Roda, Ignasi; Voinov, A.A.; Jakeman, A.J.; Rizzoli, A.E.

    2006-01-01

    There are inherent open problems arising when developing and running Intelligent Environmental Decision Support Systems (IEDSS). During daily operation of IEDSS several open challenge problems appear. The uncertainty of data being processed is intrinsic to the environmental system, which is being monitored by several on-line sensors and off-line data. Thus, anomalous data values at data gathering level or even uncertain reasoning process at later levels such as in diagnosis or decision support or planning can lead the environmental process to unsafe critical operation states. At diagnosis level or even at decision support level or planning level, spatial reasoning or temporal reasoning or both aspects can influence the reasoning processes undertaken by the IEDSS. Most of Environmental systems must take into account the spatial relationships between the environmental goal area and the nearby environmental areas and the temporal relationships between the current state and the past states of the environmental system to state accurate and reliable assertions to be used within the diagnosis process or decision support process or planning process. Finally, a related issue is a crucial point: are really reliable and safe the decisions proposed by the IEDSS? Are we sure about the goodness and performance of proposed solutions? How can we ensure a correct evaluation of the IEDSS? Main goal of this paper is to analyse these four issues, review some possible approaches and techniques to cope with them, and study new trends for future research within the IEDSS field.

  6. Transportation planning performance measures : final report.

    DOT National Transportation Integrated Search

    2005-10-01

    Oregon transportation plans, including the statewide Oregon Transportation Plan, and current regional transportation plans for the Portland, Salem, Eugene, and Medford metropolitan areas, contain some policy areas that are not adequately addressed by...

  7. 76 FR 76180 - Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Suisun Marsh...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ...) Federal joint lead agencies, and the State of California Department of Fish and Game (DFG), acting as the..., Preservation, and Restoration Plan (SMP) Final EIS/EIR. The SMP is a comprehensive plan designed to address the...

  8. Final Approval of Arizona Air Plan Revision; Lead-bearing Fugitive Dust Associated With Hayden, AZ Copper Smelter

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning emissions of lead-bearing fugitive dust associated with the primary copper smelter located in Hayden, Arizona.

  9. 77 FR 38801 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Resource Management (VRM) Plan, Amendment, Class Designation, Carbon County, WY, Review Period Ends: 07/30... Final Vehicle Management Plan, Implementation, Denali National Park and Preserve, AK, Review Period Ends.... EIS No. 20120199, Final EIS, RUS, MS, ADOPTION--Kemper County Integrated Gasification Combined Cycle...

  10. 2nd Generation RLV Risk Reduction Definition Program: Pratt & Whitney Propulsion Risk Reduction Requirements Program (TA-3 & TA-4)

    NASA Technical Reports Server (NTRS)

    Matlock, Steve

    2001-01-01

    This is the final report and addresses all of the work performed on this program. Specifically, it covers vehicle architecture background, definition of six baseline engine cycles, reliability baseline (space shuttle main engine QRAS), and component level reliability/performance/cost for the six baseline cycles, and selection of 3 cycles for further study. This report further addresses technology improvement selection and component level reliability/performance/cost for the three cycles selected for further study, as well as risk reduction plans, and recommendation for future studies.

  11. Analysis of Jordan’s Proposed Emergency Communication Interoperability Plan (JECIP) for Disaster Response

    DTIC Science & Technology

    2008-12-01

    Transmission quality measurements start once the call is established which includes low voice volume, level of noise , echo, crosstalk, and garbling...to failure, and finally, there is restorability which is a measure of how easy the system is restored upon failure. To reduce frequency of failure...Silicon and Germanium. These systems are friendly for the environment, have low - noise , have no fuel consumption, are maintenance-free, and have no

  12. SmartStaff: A Support Concept for Staff Planning

    DTIC Science & Technology

    2000-11-01

    facilitated time management and decreased the ambiguities of the plans presented. However, the quality of the final plan did not improve. Team decision making, Team Planning, Group Support Systems, Task Group Staff

  13. Examination of the Locus of Positional Effects on Children's Production of Plural -s: Considerations From Local and Global Speech Planning.

    PubMed

    Theodore, Rachel M; Demuth, Katherine; Shattuck-Hufnagel, Stefanie

    2015-06-01

    Prosodic and articulatory factors influence children's production of inflectional morphemes. For example, plural -s is produced more reliably in utterance-final compared to utterance-medial position (i.e., the positional effect), which has been attributed to the increased planning time in utterance-final position. In previous investigations of plural -s, utterance-medial plurals were followed by a stop consonant (e.g., dogsbark), inducing high articulatory complexity. We examined whether the positional effect would be observed if the utterance-medial context were simplified to a following vowel. An elicited imitation task was used to collect productions of plural nouns from 2-year-old children. Nouns were elicited utterance-medially and utterance-finally, with the medial plural followed by either a stressed or an unstressed vowel. Acoustic analysis was used to identify evidence of morpheme production. The positional effect was absent when the morpheme was followed by a vowel (e.g., dogseat). However, it returned when the vowel-initial word contained 2 syllables (e.g., dogsarrive), suggesting that the increased processing load in the latter condition negated the facilitative effect of the easy articulatory context. Children's productions of grammatical morphemes reflect a rich interaction between emerging levels of linguistic competence, raising considerations for diagnosis and rehabilitation of language disorders.

  14. Highly Efficient Training, Refinement, and Validation of a Knowledge-based Planning Quality-Control System for Radiation Therapy Clinical Trials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Nan; Carmona, Ruben; Sirak, Igor

    Purpose: To demonstrate an efficient method for training and validation of a knowledge-based planning (KBP) system as a radiation therapy clinical trial plan quality-control system. Methods and Materials: We analyzed 86 patients with stage IB through IVA cervical cancer treated with intensity modulated radiation therapy at 2 institutions according to the standards of the INTERTECC (International Evaluation of Radiotherapy Technology Effectiveness in Cervical Cancer, National Clinical Trials Network identifier: 01554397) protocol. The protocol used a planning target volume and 2 primary organs at risk: pelvic bone marrow (PBM) and bowel. Secondary organs at risk were rectum and bladder. Initial unfiltered dose-volumemore » histogram (DVH) estimation models were trained using all 86 plans. Refined training sets were created by removing sub-optimal plans from the unfiltered sample, and DVH estimation models… and DVH estimation models were constructed by identifying 30 of 86 plans emphasizing PBM sparing (comparing protocol-specified dosimetric cutpoints V{sub 10} (percentage volume of PBM receiving at least 10 Gy dose) and V{sub 20} (percentage volume of PBM receiving at least 20 Gy dose) with unfiltered predictions) and another 30 of 86 plans emphasizing bowel sparing (comparing V{sub 40} (absolute volume of bowel receiving at least 40 Gy dose) and V{sub 45} (absolute volume of bowel receiving at least 45 Gy dose), 9 in common with the PBM set). To obtain deliverable KBP plans, refined models must inform patient-specific optimization objectives and/or priorities (an auto-planning “routine”). Four candidate routines emphasizing different tradeoffs were composed, and a script was developed to automatically re-plan multiple patients with each routine. After selection of the routine that best met protocol objectives in the 51-patient training sample (KBP{sub FINAL}), protocol-specific DVH metrics and normal tissue complication probability were compared for original versus KBP{sub FINAL} plans across the 35-patient validation set. Paired t tests were used to test differences between planning sets. Results: KBP{sub FINAL} plans outperformed manual planning across the validation set in all protocol-specific DVH cutpoints. The mean normal tissue complication probability for gastrointestinal toxicity was lower for KBP{sub FINAL} versus validation-set plans (48.7% vs 53.8%, P<.001). Similarly, the estimated mean white blood cell count nadir was higher (2.77 vs 2.49 k/mL, P<.001) with KBP{sub FINAL} plans, indicating lowered probability of hematologic toxicity. Conclusions: This work demonstrates that a KBP system can be efficiently trained and refined for use in radiation therapy clinical trials with minimal effort. This patient-specific plan quality control resulted in improvements on protocol-specific dosimetric endpoints.« less

  15. Strategic environmental assessment (SEA) for wind energy planning: Lessons from the United Kingdom and Germany

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phylip-Jones, J., E-mail: jonesjp@liverpool.ac.uk; Fischer, T.B., E-mail: fischer@liv.ac.uk

    This paper reports on SEA applied in the wind energy sector in the UK and Germany. Based on a review of 18 SEAs, it is found that the quality of SEA documentation is variable, with over a third of them being deemed unsatisfactory. Furthermore, SEA processes are conducted to varying degrees of effectiveness, with scoping a strength but impact prediction and mitigation weaknesses. Generally speaking, the influence of SEA on German wind energy plan making was found to be low and the influence of SEA on UK plans deemed to be moderate. The German plans had a low influence mainlymore » because of a perceived high environmental performance of the underlying plans in the first instance. Substantive outcomes of SEA are not always clear and the influence of SEA on decision making is said to be limited in many cases. Finally, a lack of effective tiering between SEA and project level EIA is also observed. In addition, our findings echo some of the weaknesses of SEA practice found in previous studies of SEA effectiveness, including poor impact prediction and significance sections and a lack of detailed monitoring programmes for post plan implementation.« less

  16. Miami Valley ITS : early deployment plan : final user service plan

    DOT National Transportation Integrated Search

    1997-07-01

    This User Service Plan is the first major product of the process to develop an Intelligent Transportation System (ITS) Early Deployment Plan (EDP) for the Miami Valley. This User Service Plan documents the travel environment, growth trends and transp...

  17. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  18. Strategic Planning Study Team. Final Report.

    ERIC Educational Resources Information Center

    Tennessee Univ., Chattanooga.

    This final report presents the results of a University of Tennessee at Chattanooga's (UTC) strategic planning study team, which was charged with documenting computerized services currently available and recommending to the UTC administration areas in which new services should be introduced at the university. A questionnaire was administered to…

  19. 76 FR 50413 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  20. 78 FR 68739 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  1. 76 FR 8649 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  2. 77 FR 22215 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  3. 76 FR 27889 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  4. 76 FR 63836 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  5. 78 FR 11093 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  6. 76 FR 21252 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  7. 77 FR 41270 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  8. 76 FR 2578 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  9. 78 FR 62426 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  10. 77 FR 28477 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  11. 78 FR 42009 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  12. 78 FR 2881 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  13. 76 FR 70639 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  14. 75 FR 69588 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  15. 77 FR 68685 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  16. 76 FR 41689 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  17. 78 FR 28490 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  18. 77 FR 2015 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  19. 77 FR 8730 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  20. 78 FR 22192 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  1. 77 FR 62433 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  2. 75 FR 63380 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  3. Patient Protection and Affordable Care Act; third party payment of qualified health plan premiums. Interim final rule with comment period.

    PubMed

    2014-03-19

    This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.

  4. MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints

    DTIC Science & Technology

    2001-08-01

    progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New

  5. Decommissioning strategy for liquid low-level radioactive waste surface storage water reservoir.

    PubMed

    Utkin, S S; Linge, I I

    2016-11-22

    The Techa Cascade of water reservoirs (TCR) is one of the most environmentally challenging facilities resulted from FSUE "PA "Mayak" operations. Its reservoirs hold over 360 mln m 3 of liquid radioactive waste with a total activity of some 5 × 10 15 Bq. A set of actions implemented under a special State program involving the development of a strategic plan aimed at complete elimination of TCR challenges (Strategic Master-Plan for the Techa Cascade of water reservoirs) resulted in considerable reduction of potential hazards associated with this facility. The paper summarizes the key elements of this master-plan: defining TCR final state, feasibility study of the main strategies aimed at its attainment, evaluation of relevant long-term decommissioning strategy, development of computational tools enabling the long-term forecast of TCR behavior depending on various engineering solutions and different weather conditions. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. 25 CFR 1000.20 - What is required in a planning report?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... planning phase, the Tribe/Consortium must prepare and submit to the Secretary a final planning report. (a... Tribe's/Consortium's planning efforts have revealed that its current organization is adequate to assume...

  7. Patient Protection and Affordable Care Act; Market Stabilization. Final rule.

    PubMed

    2017-04-18

    This rule finalizes changes that will help stabilize the individual and small group markets and affirm the traditional role of State regulators. This final rule amends standards relating to special enrollment periods, guaranteed availability, and the timing of the annual open enrollment period in the individual market for the 2018 plan year; standards related to network adequacy and essential community providers for qualified health plans; and the rules around actuarial value requirements.

  8. 77 FR 60137 - Lee Metcalf National Wildlife Refuge, Ravalli County, MT; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    .... The final plan identifies goals, objectives, and strategies that describe the future management of the... management purpose, for migratory birds'' (Migratory Bird Conservation Act); and (2) ``for (a) incidental... participate in interpretive programs in the indoor and outdoor classrooms. The Refuge provides habitat for...

  9. 77 FR 24403 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    .../Infectious Waste Incinerators'' (HMIWI). The Illinois Environmental Protection Agency (IEPA) submitted the... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0087; FRL-9663-4] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...

  10. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  11. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  12. 76 FR 67369 - Revisions to the California State Implementation Plan, Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... the California State Implementation Plan, Joaquin Valley Unified Air Pollution Control District and Imperial County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution...

  13. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Management Plan and... Administration (NOAA), Department of Commerce (DOC). ACTION: Notice of public availability. SUMMARY: NOAA is... the wreck of the famed Civil War ironclad, USS Monitor, best known for its battle with the Confederate...

  14. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  15. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  16. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  17. Spatial Patterns and Sequential Sampling Plans for Predators of Aphis glycines (Hemiptera: Aphididae) in Minnesota Soybean.

    PubMed

    Tran, Anh K; Koch, Robert L

    2017-06-01

    The soybean aphid, Aphis glycines Matsumura, is an economically important soybean pest. Many studies have demonstrated that predatory insects are important in suppressing A. glycines population growth. However, to improve the utilization of predators in A. glycines management, sampling plans need to be developed and validated for predators. Aphid predators were sampled in soybean fields near Rosemount, Minnesota, from 2006-2007 and 2013-2015 with sample sizes of 20-80 plants. Sampling plans were developed for Orius insidiosus (Say), Harmonia axyridis (Pallas), and all aphidophagous Coccinellidae species combined. Taylor's power law parameters from the regression of log variance versus log mean suggested aggregated spatial patterns for immature and adult stages combined for O. insidiosus, H. axyridis, and Coccinellidae in soybean fields. Using the parameters from Taylor's power law and Green's method, sequential fixed-precision sampling plans were developed to estimate the density for each predator taxon at desired precision levels of 0.10 and 0.25. To achieve a desired precision of 0.10 and 0.25, the average sample number (ASN) ranged from 398-713 and 64-108 soybean plants, respectively, for all species. Resulting ASNs were relatively large and assumed impractical for most purposes; therefore, the desired precision levels were adjusted to determine the level of precision associated with a more practical ASN. Final analysis indicated an ASN of 38 soybean plants provided precision of 0.32-0.40 for the predators. Development of sampling plans should provide guidance for improved estimation of predator densities for A. glycines pest management programs and for research purposes. © The Authors 2017. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  18. Integration of task level planning and diagnosis for an intelligent robot

    NASA Technical Reports Server (NTRS)

    Gerstenfeld, Arthur

    1988-01-01

    The use of robots in the future must go beyond present applications and will depend on the ability of a robot to adapt to a changing environment and to deal with unexpected scenarios (i.e., picking up parts that are not exactly where they were expected to be). The objective of this research is to demonstrate the feasibility of incorporating high level planning into a robot enabling it to deal with anomalous situations in order to minimize the need for constant human instruction. The heuristics can be used by a robot to apply information about previous actions towards accomplishing future objectives more efficiently. The system uses a decision network that represents the plan for accomplishing a task. This enables the robot to modify its plan based on results of previous actions. The system serves as a method for minimizing the need for constant human instruction in telerobotics. This paper describes the integration of expert systems and simulation as a valuable tool that goes far beyond this project. Simulation can be expected to be used increasingly as both hardware and software improve. Similarly, the ability to merge an expert system with simulation means that we can add intelligence to the system. A malfunctioning space satellite is described. The expert system uses a series of heuristics in order to guide the robot to the proper location. This is part of task level planning. The final part of the paper suggests directions for future research. Having shown the feasibility of an expert system embedded in a simulation, the paper then discusses how the system can be integrated with the MSFC graphics system.

  19. Patient Protection and Affordable Care Act; health insurance market rules. Final rule.

    PubMed

    2013-02-27

    This final rule implements provisions related to fair health insurance premiums, guaranteed availability, guaranteed renewability, single risk pools, and catastrophic plans, consistent with title I of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. The final rule clarifies the approach used to enforce the applicable requirements of the Affordable Care Act with respect to health insurance issuers and group health plans that are non-federal governmental plans. This final rule also amends the standards for health insurance issuers and states regarding reporting, utilization, and collection of data under the federal rate review program, and revises the timeline for states to propose state-specific thresholds for review and approval by the Centers for Medicare & Medicaid Services (CMS).

  20. Wake-Sleep Cycle Management during SUSOPS and CONOPS in French Military Forces: Policy and Ethics

    DTIC Science & Technology

    2009-10-01

    sleepiness for 48 hours. Finally, Z- hypnotics are also allowed to promote pre- planned sleep episodes. Nevertheless, the use of these drugs acting on...Finally, Z- hypnotics are also allowed to promote pre- planned sleep episodes. Nevertheless, the use of these drugs acting on the central nervous system...why the individual test of tolerance, planned in the MD instruction, seems to be particularly important for modafinil before operational use. 3.2

  1. Pretest information for a test to validate plume simulation procedures (FA-17)

    NASA Technical Reports Server (NTRS)

    Hair, L. M.

    1978-01-01

    The results of an effort to plan a final verification wind tunnel test to validate the recommended correlation parameters and application techniques were presented. The test planning effort was complete except for test site finalization and the associated coordination. Two suitable test sites were identified. Desired test conditions were shown. Subsequent sections of this report present the selected model and test site, instrumentation of this model, planned test operations, and some concluding remarks.

  2. Nursing student plans for the future after graduation: a multicentre study.

    PubMed

    Palese, A; Falomo, M; Brugnolli, A; Mecugni, D; Marognolli, O; Montalti, S; Tameni, A; Gonella, S; Dimonte, V

    2017-03-01

    When modelling the nursing workforce, estimations of the numbers and characteristics of new graduates over the forecast period are assumed on the basis of previous generations; however, new graduates may have different plans for their future than those documented previously in different socio-economical contexts. To explore (a) nursing student plans after graduation and factors influencing their plans, and (b) factors associated with the intention to emigrate. A survey questionnaire was developed and distributed to students attending their final third year of nursing education in seven universities in Italy in 2015. Nine hundred and twenty-three (90.4%) students participated. Four different plans after graduation emerged: about two-thirds reported an intention to look for a nursing job in Italy; the remaining reported (a) an intention to emigrate, looking for a nursing job abroad, (b) an intention to search for a nursing job in both Italy and abroad, and (c) while a few an intention to continue nursing education in Italy. Having previous experience abroad, the need to grow and be satisfied, trusting the target country and a desire to increase knowledge encouraged an intention to emigrate, whereas the desire to stay in a comfortable environment and nurture personal relationships prevented the desire to migrate. Nursing students may have different plans after graduation, and this should be considered when modelling the nursing workforce of the future. Policymakers should be aware of different plans after graduation to guide healthcare human resource strategies. Knowing these trajectories allows policymakers to estimate the appropriate nursing workforce, and also to act at both macro- and meso-levels, on work environments and opportunities for professional development, according to the different levels of expectations. © 2016 International Council of Nurses.

  3. A study of the performance of patients with frontal lobe lesions in a financial planning task.

    PubMed

    Goel, V; Grafman, J; Tajik, J; Gana, S; Danto, D

    1997-10-01

    It has long been argued that patients with lesions in the prefrontal cortex have difficulties in decision making and problem solving in real-world, ill-structured situations, particularly problem types involving planning and look-ahead components. Recently, several researchers have questioned our ability to capture and characterize these deficits adequately using just the standard neuropsychological test batteries, and have called for tests that reflect real-world task requirements more accurately. We present data from 10 patients with focal lesions to the prefrontal cortex and 10 normal control subjects engaged in a real-world financial planning task. We also introduce a theoretical framework and methodology developed in the cognitive science literature for quantifying and analysing the complex data generated by problem-solving tasks. Our findings indicate that patient performance is impoverished at a global level but not at the local level. Patients have difficulty in organizing and structuring their problem space. Once they begin problem solving, they have difficulty in allocating adequate effort to each problem-solving phase. Patients also have difficulty dealing with the fact that there are no right or wrong answers nor official termination points in real-world planning problems. They also find it problematic to generate their own feedback. They invariably terminate the session before the details are fleshed out and all the goals satisfied. Finally, patients do not take full advantage of the fact that constraints on real-world problems are negotiable. However, it is not necessary to postulate a 'planning' deficit. It is possible to understand the patients' difficulties in real world planning tasks in terms of the following four accepted deficits: inadequate access to 'structured event complexes', difficulty in generalizing from particulars, failure to shift between 'mental sets', and poor judgment regarding adequacy and completeness of a plan.

  4. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less

  5. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  6. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  7. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) A cyber security plan in accordance with the criteria set forth in § 73.54 of this chapter; (iv) A... cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan, shall protect the plans and...

  8. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  9. Financing Maternal Health and Family Planning: Are We on the Right Track? Evidence from the Reproductive Health Subaccounts in Mexico, 2003-2012.

    PubMed

    Avila-Burgos, Leticia; Cahuana-Hurtado, Lucero; Montañez-Hernandez, Julio; Servan-Mori, Edson; Aracena-Genao, Belkis; Del Río-Zolezzi, Aurora

    2016-01-01

    To analyze whether the changes observed in the level and distribution of resources for maternal health and family planning (MHFP) programs from 2003 to 2012 were consistent with the financial goals of the related policies. A longitudinal descriptive analysis of the Mexican Reproductive Health Subaccounts 2003-2012 was performed by financing scheme and health function. Financing schemes included social security, government schemes, household out-of-pocket (OOP) payments, and private insurance plans. Functions were preventive care, including family planning, antenatal and puerperium health services, normal and cesarean deliveries, and treatment of complications. Changes in the financial imbalance indicators covered by MHFP policy were tracked: (a) public and OOP expenditures as percentages of total MHFP spending; (b) public expenditure per woman of reproductive age (WoRA, 15-49 years) by financing scheme; (c) public expenditure on treating complications as a percentage of preventive care; and (d) public expenditure on WoRA at state level. Statistical analyses of trends and distributions were performed. Public expenditure on government schemes grew by approximately 300%, and the financial imbalance between populations covered by social security and government schemes decreased. The financial burden on households declined, particularly among households without social security. Expenditure on preventive care grew by 16%, narrowing the financing gap between treatment of complications and preventive care. Finally, public expenditure per WoRA for government schemes nearly doubled at the state level, although considerable disparities persist. Changes in the level and distribution of MHFP funding from 2003 to 2012 were consistent with the relevant policy goals. However, improving efficiency requires further analysis to ascertain the impact of investments on health outcomes. This, in turn, will require better financial data systems as a precondition for improving the monitoring and accountability functions in Mexico.

  10. Effects of planning strategies on writing dynamics and final texts.

    PubMed

    Limpo, Teresa; Alves, Rui A

    2018-06-12

    Expert writing involves the interaction among three cognitively demanding processes: planning, translating, and revising. To manage the cognitive load brought on by these processes, writers frequently use strategies. Here, we examined the effects of planning strategies on writing dynamics and final texts. Before writing an argumentative text with the triple-task technique, 63 undergraduates were asked either to elaborate an outline with the argumentative structure embedded (structure-based planning condition), to provide a written list of ideas for the text (list-based planning condition), or to do a non-writing-related filler task (no planning condition). Planning showed no effects on the length of the pre-writing pause and cognitive effort, but influenced writing processes occurrences. Compared to participants in the no-planning condition, those in the planning conditions showed a later activation of revising. Moreover, participants in the structure-based condition were mainly focused on translating in the beginning and middle of composition, whereas their peers tended to distribute their attention among all processes. Planning ahead of writing also resulted in texts with longer words, produced at a higher rate. Only the structure-based planning strategy led to an increase in the number of argumentation elements as well as in essays' persuasiveness and overall quality. There was, however, no indication that these improvements in final texts were associated with changes in the dynamics of writing. Overall, the use of structure-based plans seems to be an effective and efficient way of improving undergraduates' argumentative writing. Copyright © 2018 Elsevier B.V. All rights reserved.

  11. Minimum Value of Eligible Employer-Sponsored Plans and Other Rules Regarding the Health Insurance Premium Tax Credit. Final regulations.

    PubMed

    2015-12-18

    This document contains final regulations on the health insurance premium tax credit enacted by the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010, as amended by the Medicare and Medicaid Extenders Act of 2010, the Comprehensive 1099 Taxpayer Protection and Repayment of Exchange Subsidy Overpayments Act of 2011, and the Department of Defense and Full-Year Continuing Appropriations Act, 2011. These final regulations affect individuals who enroll in qualified health plans through Affordable Insurance Exchanges (Exchanges, sometimes called Marketplaces) and claim the health insurance premium tax credit, and Exchanges that make qualified health plans available to individuals and employers.

  12. Calibration Results and Anticipated Science Ops for the Parker Solar Probe's SWEAP/SPAN-Electron Analyzers

    NASA Astrophysics Data System (ADS)

    Whittlesey, P. L.; Larson, D. E.; Livi, R.; Abiad, R.; Parker, C.; Halekas, J. S.; Kasper, J. C.; Korreck, K. E.

    2017-12-01

    We present the SPAN-E calibration results and science operation plans this instrument on the Parker Solar Probe mission. SPAN-E is a pair of highly configurable ESA sensors, one on the RAM side of the spacecraft (SPAN-Ae) and one on anti-RAM (SPAN-B). Together, SPAN-E will jointly measure the full 3D thermal and suprathermal electron distribution function at cadences as fast as 4.58Hz. Joined with the SPAN-Ai and SPC instruments that are part of the Solar Wind Electrons, Alphas, and Protons (SWEAP) suite, SPAN-E will measure the solar coronal plasma across a range of energies and densities with a FOV over >90% of the sky, returning data over a 7 year long PSP mission lifetime. The SPAN-E instruments have passed environmental testing at the instrument level, and the final instrument calibrations are complete. This presentation details the final instrument calibration results as performed at UCB/SSL after environmental testing, and details the planned configurations for PSP's first orbit. In addition, the PSP spacecraft's magnetic fields are expected to distort the measured electron VDFs at low energies, thus we present a novel computer vision method of measuring and modeling the spacecraft magnetic fields as seen during an observatory-level "swing" test. Ultimately, the model will feed into an algorithm for ground corrections to electron VDFs distorted by these stray spacecraft magnetic fields.

  13. Supersonics--Airport Noise

    NASA Technical Reports Server (NTRS)

    Bridges, James

    2007-01-01

    At this, the first year-end meeting of the Fundamental Aeronautics Program, an overview of the Airport Noise discipline of the Supersonics Project leads the presentation of technical plans and achievements in this area of the Project. The overview starts by defining the Technical Challenges targeted by Airport Noise efforts, and the Approaches planned to meet these challenges. These are fleshed out in Elements, namely Prediction, Diagnostics, and Engineering, and broken down into Tasks. The Tasks level is where individual researchers' work is defined and from whence the technical presentations to follow this presentation come. This overview also presents the Milestones accomplished to date and to be completed in the next year. Finally, the NASA Research Announcement cooperative agreement activities are covered and tied to the Tasks and Milestones.

  14. Least-cost transportation planning in ODOT : phase 2 final report.

    DOT National Transportation Integrated Search

    1996-06-01

    This project is intended to suggest ways in which least-cost planning principles could be incorporated into the transportation planning process. The Mt. Hood corridor was chosen for examination. The examination of the planning process highlighted sev...

  15. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  16. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  17. Addressing uncertainty in adaptation planning for agriculture.

    PubMed

    Vermeulen, Sonja J; Challinor, Andrew J; Thornton, Philip K; Campbell, Bruce M; Eriyagama, Nishadi; Vervoort, Joost M; Kinyangi, James; Jarvis, Andy; Läderach, Peter; Ramirez-Villegas, Julian; Nicklin, Kathryn J; Hawkins, Ed; Smith, Daniel R

    2013-05-21

    We present a framework for prioritizing adaptation approaches at a range of timeframes. The framework is illustrated by four case studies from developing countries, each with associated characterization of uncertainty. Two cases on near-term adaptation planning in Sri Lanka and on stakeholder scenario exercises in East Africa show how the relative utility of capacity vs. impact approaches to adaptation planning differ with level of uncertainty and associated lead time. An additional two cases demonstrate that it is possible to identify uncertainties that are relevant to decision making in specific timeframes and circumstances. The case on coffee in Latin America identifies altitudinal thresholds at which incremental vs. transformative adaptation pathways are robust options. The final case uses three crop-climate simulation studies to demonstrate how uncertainty can be characterized at different time horizons to discriminate where robust adaptation options are possible. We find that impact approaches, which use predictive models, are increasingly useful over longer lead times and at higher levels of greenhouse gas emissions. We also find that extreme events are important in determining predictability across a broad range of timescales. The results demonstrate the potential for robust knowledge and actions in the face of uncertainty.

  18. Addressing uncertainty in adaptation planning for agriculture

    PubMed Central

    Vermeulen, Sonja J.; Challinor, Andrew J.; Thornton, Philip K.; Campbell, Bruce M.; Eriyagama, Nishadi; Vervoort, Joost M.; Kinyangi, James; Jarvis, Andy; Läderach, Peter; Ramirez-Villegas, Julian; Nicklin, Kathryn J.; Hawkins, Ed; Smith, Daniel R.

    2013-01-01

    We present a framework for prioritizing adaptation approaches at a range of timeframes. The framework is illustrated by four case studies from developing countries, each with associated characterization of uncertainty. Two cases on near-term adaptation planning in Sri Lanka and on stakeholder scenario exercises in East Africa show how the relative utility of capacity vs. impact approaches to adaptation planning differ with level of uncertainty and associated lead time. An additional two cases demonstrate that it is possible to identify uncertainties that are relevant to decision making in specific timeframes and circumstances. The case on coffee in Latin America identifies altitudinal thresholds at which incremental vs. transformative adaptation pathways are robust options. The final case uses three crop–climate simulation studies to demonstrate how uncertainty can be characterized at different time horizons to discriminate where robust adaptation options are possible. We find that impact approaches, which use predictive models, are increasingly useful over longer lead times and at higher levels of greenhouse gas emissions. We also find that extreme events are important in determining predictability across a broad range of timescales. The results demonstrate the potential for robust knowledge and actions in the face of uncertainty. PMID:23674681

  19. Planning for Disaster.

    ERIC Educational Resources Information Center

    Lewis, Steven

    1996-01-01

    Disaster recovery planning need not be expensive nor complete to be effective. Systematic planning involves several crucial steps, including outlining the final plan, understanding the nature of a disaster's effects and the stages of disaster recovery, prioritizing appropriately, and learning how to test the plan in a practical way for the…

  20. Regional Haze Plan for Texas and Oklahoma

    EPA Pesticide Factsheets

    EPA partially approved and partially disapproved the Texas regional haze plan. EPA also finalized a plan to limit sulfur dioxide emissions from eight Texas coal-fired electricity generating facilities

  1. 75 FR 27944 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ...; State of California; PM-10; Determination of Attainment for the Coso Junction Nonattainment Area... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing its determination that the Coso Junction... Officer, GBUAPCD, to Doris Lo, Environmental Protection Specialist, EPA, with CosoJunction2010--MetAndTEOM...

  2. 77 FR 24483 - Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To Intervene, and...: Wausau Paper Mills, LLC. e. Name of Project: Rhinelander Hydroelectric Project. f. Location: The upper.... Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC, 515 Davenport St., Rhinelander, Wisconsin...

  3. FOCUS: a fire management planning system -- final report

    Treesearch

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  4. Medical loss ratio rebate requirements for non-federal governmental plans. Interim final rule with request for comments.

    PubMed

    2011-12-07

    This interim final rule with comment period revises the regulations implementing medical loss ratio (MLR) requirements for health insurance issuers under the Public Health Service Act in order to establish rules governing the distribution of rebates by issuers in group markets for non-Federal governmental plans.

  5. 77 FR 64734 - Approval and Promulgation of Implementation Plans; North Dakota: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Permitting Authority and Tailoring Rule; PM 2.5 NSR Implementation Rule AGENCY: Environmental Protection... Implementation Plan (SIP) relating to regulation of Greenhouse Gases (GHGs) and fine particulate matter (PM 2.5... Tailoring Final Rule'' and the final rule for ``Implementation of the New Source Review (NSR) Program for PM...

  6. 78 FR 34402 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ...-FF03E15000] Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement, Ni... Environmental Impact Statement (FEIS) associated with an application received from NiSource Inc. (hereafter ``Ni... Endangered Species Act of 1973, as amended (ESA). If issued, the ITP would authorize NiSource to take 10...

  7. 76 FR 52690 - Final Environmental Impact Statement on Nabesna Off-Road Vehicle Management Plan, Wrangell-St...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ...-Road Vehicle Management Plan, Wrangell-St. Elias National Park and Preserve AGENCY: National Park... a Final Environmental Impact Statement (FEIS) on Off-Road Vehicle Management in the Nabesna District... preferred alternative and four action alternatives for management of off-road vehicles in the Nabesna...

  8. 75 FR 21342 - Notice of Availability of the Final Environmental Impact Statement for the Mona to Oquirrh...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Corridor Project, Utah, and the Proposed Pony Express Resource Management Plan Amendment AGENCY: Bureau of...)/Proposed Resource Management Plan Amendment (RMPA) for the Mona to Oquirrh Transmission Corridor Project... Final EIS/Proposed RMPA for the Mona to Oquirrh Transmission Corridor Project have been sent to affected...

  9. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  10. 77 FR 24405 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Incinerators'' (HMIWI). The Indiana Department of Environmental Management (IDEM) submitted the revised State... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0086; FRL-9663-2] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...

  11. An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information (Final Report)

    EPA Science Inventory

    EPA announced the availability of the final report, An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information. This report is a review of decision-making processes of selected land protection prog...

  12. National Primary and Secondary Ambient Air Quality Standards (NAAQS) for Lead (Pb) and Implementation Plans for Lead NAAQS: 1978 Final Rule (43 FR 46246 & 46264)

    EPA Pesticide Factsheets

    This document is a copy of the Federal Register publication of the October 5, 1978 Final Rules for National Primary and Secondary Ambient Air Quality Standards for Lead (Pb) and Implementation Plans for Lead (Pb) NAAQS.

  13. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. OVERVIEW AND APPLICATION. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  14. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 4: ANALYTICAL GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  15. 75 FR 6218 - New Melones Lake Area Resource Management Plan, Tuolumne and Calaveras Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation New Melones Lake Area Resource Management Plan...) has made available for public review a Final RMP/EIS for the New Melones Lake Area. The Final RMP/EIS... Dan Holsapple, Acting New Melones Resource Manager, Bureau of Reclamation, at 209-536- 9094...

  16. 77 FR 76515 - Notice of Availability of the National Petroleum Reserve-Alaska Final Integrated Activity Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAK930000.L13100000.DS0000] Notice of Availability of the National Petroleum Reserve-Alaska Final Integrated Activity Plan/Environmental Impact... of Land Management (BLM), Alaska State Office, is issuing the National Petroleum Reserve in Alaska...

  17. 75 FR 44977 - General Management Plan/Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... Impact Statement for the General Management Plan (GMP/EIS) for Roosevelt-Vanderbilt National Historic Sites, Hyde Park, New York. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets detailing editorial corrections to...

  18. 40 CFR 62.14565 - How do I comply with the increment of progress for achieving final compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... complete retrofit construction of control devices, as specified in the final control plan, so that, when...

  19. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Historic trails. The four alternatives were: Alternative A: Continues existing management practices (no... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement...

  20. WE-AB-209-05: Development of an Ultra-Fast High Quality Whole Breast Radiotherapy Treatment Planning System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sheng, Y; Li, T; Yoo, S

    2016-06-15

    Purpose: To enable near-real-time (<20sec) and interactive planning without compromising quality for whole breast RT treatment planning using tangential fields. Methods: Whole breast RT plans from 20 patients treated with single energy (SE, 6MV, 10 patients) or mixed energy (ME, 6/15MV, 10 patients) were randomly selected for model training. Additional 20 cases were used as validation cohort. The planning process for a new case consists of three fully automated steps:1. Energy Selection. A classification model automatically selects energy level. To build the energy selection model, principle component analysis (PCA) was applied to the digital reconstructed radiographs (DRRs) of training casesmore » to extract anatomy-energy relationship.2. Fluence Estimation. Once energy is selected, a random forest (RF) model generates the initial fluence. This model summarizes the relationship between patient anatomy’s shape based features and the output fluence. 3. Fluence Fine-tuning. This step balances the overall dose contribution throughout the whole breast tissue by automatically selecting reference points and applying centrality correction. Fine-tuning works at beamlet-level until the dose distribution meets clinical objectives. Prior to finalization, physicians can also make patient-specific trade-offs between target coverage and high-dose volumes.The proposed method was validated by comparing auto-plans with manually generated clinical-plans using Wilcoxon Signed-Rank test. Results: In 19/20 cases the model suggested the same energy combination as clinical-plans. The target volume coverage V100% was 78.1±4.7% for auto-plans, and 79.3±4.8% for clinical-plans (p=0.12). Volumes receiving 105% Rx were 69.2±78.0cc for auto-plans compared to 83.9±87.2cc for clinical-plans (p=0.13). The mean V10Gy, V20Gy of the ipsilateral lung was 24.4±6.7%, 18.6±6.0% for auto plans and 24.6±6.7%, 18.9±6.1% for clinical-plans (p=0.04, <0.001). Total computational time for auto-plans was < 20s. Conclusion: We developed an automated method that generates breast radiotherapy plans with accurate energy selection, similar target volume coverage, reduced hotspot volumes, and significant reduction in planning time, allowing for near-real-time planning.« less

  1. Integrated Traffic Flow Management Decision Making

    NASA Technical Reports Server (NTRS)

    Grabbe, Shon R.; Sridhar, Banavar; Mukherjee, Avijit

    2009-01-01

    A generalized approach is proposed to support integrated traffic flow management decision making studies at both the U.S. national and regional levels. It can consider tradeoffs between alternative optimization and heuristic based models, strategic versus tactical flight controls, and system versus fleet preferences. Preliminary testing was accomplished by implementing thirteen unique traffic flow management models, which included all of the key components of the system and conducting 85, six-hour fast-time simulation experiments. These experiments considered variations in the strategic planning look-ahead times, the replanning intervals, and the types of traffic flow management control strategies. Initial testing indicates that longer strategic planning look-ahead times and re-planning intervals result in steadily decreasing levels of sector congestion for a fixed delay level. This applies when accurate estimates of the air traffic demand, airport capacities and airspace capacities are available. In general, the distribution of the delays amongst the users was found to be most equitable when scheduling flights using a heuristic scheduling algorithm, such as ration-by-distance. On the other hand, equity was the worst when using scheduling algorithms that took into account the number of seats aboard each flight. Though the scheduling algorithms were effective at alleviating sector congestion, the tactical rerouting algorithm was the primary control for avoiding en route weather hazards. Finally, the modeled levels of sector congestion, the number of weather incursions, and the total system delays, were found to be in fair agreement with the values that were operationally observed on both good and bad weather days.

  2. McClellan AFB, California, RI/FS Quality Assurance Project Plan. Installation Restoration Program (IRP) Stage 3.

    DTIC Science & Technology

    1992-08-07

    AD-A5 6 ... 1... . .. .. .... INSTALLATION RESTORATION PROGRAM (IRP) STAGE 3 7m~ QUALITY ASSURANCE -k- PROJECT PLAN for McCLELLAN AFB , CALIFORNIA...FINAL.. S AUG 2. 1 1992 L PREPARED FOR: .... ... McCLELLAN AFB IEM McCLELLAN AFB , CALIFORNIA 9652-599 ................... fr pu licrele se...PLAN FINAL ’’ : " FOR McCLELLAN AFB /EM McCLELLAN AFB , CALIFORNIA 95652-5990 August 1992 AUG 2 11992 PREPARED BY: DI Radian Corporation10389 Old

  3. Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals

    DTIC Science & Technology

    2000-04-01

    formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate

  4. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    PubMed

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  5. Intelligent transportation systems business plan for Kentucky : final report.

    DOT National Transportation Integrated Search

    2001-09-01

    This report presents a Business Plan for Intelligent Transportation Systems (ITS) in Kentucky. The purpose of the Business Plan is to define ITS projects that are planned for implementation from 2002 through 2007. The list of projects contained withi...

  6. 78 FR 28775 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY... a revision to the North Carolina State Implementation Plan submitted on February 3, 2010, through... particulate matter found in the Code of Federal Regulations. In the Final Rules Section of this Federal...

  7. Climate Change and Aquatic Invasive Species (Final Report) ...

    EPA Pesticide Factsheets

    EPA announced the availability of the final report, Climate Change and Aquatic Invasive Species. This report reviews available literature on climate-change effects on aquatic invasive species (AIS) and examines state-level AIS management activities. Data on management activities came from publicly available information, was analyzed with respect to climate-change effects, and was reviewed by managers. This report also analyzes state and regional AIS management plans to determine their capacity to incorporate information on changing conditions generally, and climate change specifically. The report is intended for managers and scientists working with AIS to provide them with information on the potential effects of climate change on AIS, strategies for adapting their management to accomodate these environmental changes, and highlight further research needs and gaps.

  8. Final Report for the Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2030 to 2035 Period, N+3 Supersonic Program

    NASA Technical Reports Server (NTRS)

    Morgenstern, John; Norstrud, Nicole; Stelmack, Marc; Skoch, Craig

    2010-01-01

    The N+3 Final Report documents the work and progress made by Lockheed Martin Aeronautics in response to the NASA sponsored program "N+3 NRA Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2030 to 2035 Period." The key technical objective of this effort was to generate promising supersonic concepts for the 2030 to 2035 timeframe and to develop plans for maturing the technologies required to make those concepts a reality. The N+3 program is aligned with NASA's Supersonic Project and is focused on providing alternative system-level solutions capable of overcoming the efficiency, environmental, and performance barriers to practical supersonic flight

  9. Results from CrIS/ATMS Obtained Using an "AIRS Version-6 Like" Retrieval Algorithm

    NASA Technical Reports Server (NTRS)

    Susskind, Joel; Kouvaris, Louis; Iredell, Lena; Blaisdell, John

    2015-01-01

    AIRS and CrIS Version-6.22 O3(p) and q(p) products are both superior to those of AIRS Version-6.Monthly mean August 2014 Version-6.22 AIRS and CrIS products agree reasonably well with OMPS, CERES, and witheach other. JPL plans to process AIRS and CrIS for many months and compare interannual differences. Updates to thecalibration of both CrIS and ATMS are still being finalized. We are also working with JPL to develop a joint AIRS/CrISlevel-1 to level-3 processing system using a still to be finalized Version-7 retrieval algorithm. The NASA Goddard DISCwill eventually use this system to reprocess all AIRS and recalibrated CrIS/ATMS. .

  10. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document. Volume 1: Major trades. Book 1: Draft final

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents trade studies and reference concept designs accomplished during a study of Space Transfer Concepts and Analyses for Exploration Missions (STCAEM). This volume contains the major top level trades, level 2 trades conducted in support of NASA's Lunar/Mars Exploration Program Office, and a synopsis of the vehicles for different propulsion systems under trade consideration. The vehicles are presented in more detail in other volumes of this report. Book 1 of Volume 1 covers the following analyses: lunar/Mars commonality trades, lunar/Mars mission operations, and Mars transfer systems.

  11. Payload accommodation and development planning tools - A Desktop Resource Leveling Model (DRLM)

    NASA Technical Reports Server (NTRS)

    Hilchey, John D.; Ledbetter, Bobby; Williams, Richard C.

    1989-01-01

    The Desktop Resource Leveling Model (DRLM) has been developed as a tool to rapidly structure and manipulate accommodation, schedule, and funding profiles for any kind of experiments, payloads, facilities, and flight systems or other project hardware. The model creates detailed databases describing 'end item' parameters, such as mass, volume, power requirements or costs and schedules for payload, subsystem, or flight system elements. It automatically spreads costs by calendar quarters and sums costs or accommodation parameters by total project, payload, facility, payload launch, or program phase. Final results can be saved or printed out, automatically documenting all assumptions, inputs, and defaults.

  12. What population studies can do for business.

    PubMed

    Hugo, G

    1991-05-01

    This paper examines how specific skills essential to demography, the scientific study of human populations, can be useful in private and public sector planning. Over the past 2 decades, Australia's population has undergone profound transformations -- a shift to below replacement level fertility and a change in ethnic composition, to name a few. And these changes have reshaped the markets for goods, services, and labor. Because demography seeks to analyze and explain changes in the size, composition, and spatial distribution of people, this discipline requires certain skills that can be particularly valuable to both private and public sector planning. These skills include: 1) a sound knowledge of why and how populations change over time; 2) a wide range of concepts (the "cohort," for example) which allow demographers to analyze the dynamics of change in a population; 3) statistical techniques; and 4) life tables techniques. Having named the specific skills of demographers, the author identifies the areas of business and public administration where these skills can be most useful, areas that include the following: strategic long-term planning, marketing, market segmentation, small area analysis, household and family level analysis, projections and estimates, human resources analysis, and international population trends. Finally, the author discusses the implications of applied population analysis on the training of demographers in Australia, emphasizing the role of the Australian Population Association in improving the status of demography as an important planning tool.

  13. Stakeholder-focused evaluation of an online course for health care providers.

    PubMed

    Dunet, Diane O; Reyes, Michele

    2006-01-01

    Different people who have a stake or interest in a training course (stakeholders) may have markedly different definitions of what constitutes "training success" and how they will use evaluation results. Stakeholders at multiple levels within and outside of the organization guided the development of an evaluation plan for a Web-based training course on hemochromatosis. Stakeholder interests and values were reflected in the type, level, and rigor of evaluation methods selected. Our mixed-method evaluation design emphasized small sample sizes and repeated measures. Limited resources for evaluation were leveraged by focusing on the data needs of key stakeholders, understanding how they wanted to use evaluation results, and collecting data needed for stakeholder decision making. Regular feedback to key stakeholders provided opportunities for updating the course evaluation plan to meet emerging needs for new or different information. Early and repeated involvement of stakeholders in the evaluation process also helped build support for the final product. Involving patient advocacy groups, managers, and representative course participants improved the course and enhanced product dissemination. For training courses, evaluation planning is an opportunity to tailor methods and data collection to meet the information needs of particular stakeholders. Rigorous evaluation research of every training course may be infeasible or unwarranted; however, course evaluations can be improved by good planning. A stakeholder-focused approach can build a picture of the results and impact of training while fostering the practical use of evaluation data.

  14. 20 CFR 628.426 - Disapproval or revocation of the plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Disapproval or revocation of the plan. (a) If the Governor disapproves the SDA job training plan or plan... training plan or modification may be appealed by the PIC and chief elected official(s) of the SDA to the... and chief elected official(s) of the final disapproval of the SDA job training plan or modification...

  15. Final Environmental Impact Statement for the Galileo Mission (Tier 2)

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The Tier 1 (program level) EIS (NASA 1988a) considered the Titan IV launch vehicle as an alternative booster stage for launch in May 1991 or later. The May 1991 Venus launch opportunity is considered a planetary back-up for the Magellan (Venus Radar Mapper) mission, the Galileo mission, and the Ulysses mission. Plans were underway to enable the use of a Titan IV launch vehicle for the planetary back-up. However, in November 1988, the U.S. Air Force, which procures the Titan IV for NASA, notified NASA that it could not provide a Titan IV vehicle for the May 1991 launch opportunity due to high priority Department of Defense requirements. Consequently, NASA terminated all mission planning for the Titan IV planetary back-up. A minimum of 3 years is required to implement mission-specific modifications to the basic Titan IV launch configuration; therefore, insufficient time is available to use a Titan IV vehicle in May 1991. Thus, the Titan IV launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS) for the May 1991 launch opportunity.

  16. 324 Building B-Cell Pressurized Water Reactor Spent Fuel Packaging & Shipment RL Readiness Assessment Final Report [SEC 1 Thru 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HUMPHREYS, D C

    A parallel readiness assessment (RA) was conducted by independent Fluor Hanford (FH) and U. S. Department of Energy, Richland Operations Office (RL) team to verify that an adequate state of readiness had been achieved for activities associated with the packaging and shipping of pressurized water reactor fuel assemblies from B-Cell in the 324 Building to the interim storage area at the Canister Storage Building in the 200 Area. The RL review was conducted in parallel with the FH review in accordance with the Joint RL/FH Implementation Plan (Appendix B). The RL RA Team members were assigned a FH RA Teammore » counterpart for the review. With this one-on-one approach, the RL RA Team was able to assess the FH Team's performance, competence, and adherence to the implementation plan and evaluate the level of facility readiness. The RL RA Team agrees with the FH determination that startup of the 324 Building B-Cell pressurized water reactor spent nuclear fuel packaging and shipping operations can safely proceed, pending completion of the identified pre-start items in the FH final report (see Appendix A), completion of the manageable list of open items included in the facility's declaration of readiness, and execution of the startup plan to operations.« less

  17. A report on the USL NASA/RECON project. Part 1: The development of a transportable, university level, IS and R educational program

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Gallagher, Suzy; Granier, Martin

    1984-01-01

    A project is described which has as its goal the production of a set of system-independent, discipline-independent, transportable college level courses to educate science and engineering students in the use of large-scale information storage and retrieval systems. This project is being conducted with the cooperation and sponsorship of NASA by R and D teams at the University of Southwest Louisiana and Southern University. Chapter 1 is an introduction, providing an overview and a listing of the management phases. Chapter 2 furnishes general information regarding accomplishments in areas under development. Chapter 3 deals with the development of the course materials by presenting a series of diagrams and keys to depict the progress and interrelationships of various tasks and sub-tasks. Chapter 4 presents plans for activities to be conducted to complete and deliver course materials. The final chapter is a summary of project objectives, methods, plans, and accomplishments.

  18. Resilience and risk: a demographic model to inform conservation planning for polar bears

    USGS Publications Warehouse

    Regehr, Eric V.; Wilson, Ryan R.; Rode, Karyn D.; Runge, Michael C.

    2015-01-01

    Our modeling results suggest that harvest of polar bears is unlikely to accelerate population declines that result from declining carrying capacity caused by sea-ice loss, provided that several conditions are met: (1) the sustainable harvest rate reflects the population’s intrinsic growth rate, and the corresponding harvest level is obtained by applying this rate to an estimate of population size; (2) the sustainable harvest rate reflects the quality of population data (e.g., lower harvest when data are poor); and (3) the level of human-caused removals can be adjusted. Finally, our results suggest that stopgap measures (e.g., further reduction or cessation of harvest when the population size is less than a critical threshold) may be necessary to minimize the incremental risk associated with harvest, if environmental conditions are deteriorating rapidly. We suggest that the demographic model and approaches presented here can serve as a template for conservation planning for polar bears and other species facing similar challenges.

  19. Mapping and navigating mammalian conservation: from analysis to action

    PubMed Central

    Redford, Kent H.; Ray, Justina C.; Boitani, Luigi

    2011-01-01

    Although mammals are often seen as important objects of human interest and affection, many are threatened with extinction. A range of efforts have been proposed and much work has been done to try to conserve mammals, but there is little overall understanding of what has worked and why. As a result, there is no global-scale, coordinated approach to conserving all mammals. Rather, conservation efforts are usually focused at jurisdictional levels where relevant legislation and policies are in force. To help build the framework for a global-scale approach, in this paper we review the many ways that have been proposed for conserving mammals. First, we examine the overall pattern of threat faced by mammals at the global level. Secondly, we look at the major structuring issues in prioritizing and planning mammal conservation, examining in particular the roles of values and scale and a set of approaches to conservation, each of which varies along a continuum. Finally, we lay out the steps necessary to move from planning to implementing mammalian conservation. PMID:21844050

  20. Bag the gag rule. Poll indicates most Americans think global gag rule is wrong.

    PubMed

    Ernst, J; Farmer, A

    2000-09-01

    According to studies conducted by the Rand Corporation and the District of Columbia-based Center for Development and Population Activities, conservative and liberal Americans alike overwhelmingly support foreign assistance to international family planning programs. In addition, the 1998 poll shows that 92% of Americans believe that couples have the right to family planning, and a slight majority support government funding of legal overseas abortion services. Despite such evidence, members of the House Representative voted to restrict foreign family planning organizations that receive federal money from using their own non-US funds to provide abortion services overseas. To this effect, foreign family planning organizations and other concerned agencies argued that such a restriction undermines the objectives of the US and effectively denies access to desperately needed support to millions of women worldwide. In particular, organizations like the Center for Reproductive Law and Policy are lobbying lawmakers to strike the gag rule language from the final appropriations bill that will reach US President Clinton's desk, as well as to increase family planning funding levels. However, Clinton has indicated a veto if congress does pass gag rule legislation for the second year in a row.

  1. 78 FR 37126 - Approval and Promulgation of Implementation Plans; State of Kansas; Infrastructure SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of four Kansas State Implementation Plan... of proposed rulemaking for this action, which was published on April 17, 2013. DATES: This rule will... those portions in the April 17, 2013, proposed rule since they had already been acted upon by EPA. With...

  2. The Collaborative Planning Outreach Project: Building Comprehensive Early Childhood Systems. Final Report.

    ERIC Educational Resources Information Center

    Smith, Barbara J.

    This final report describes the objectives, activities and outcomes of a federally funded initiative to train and assist early childhood interagency teams in a model of planning systems and services for all young children, including children with disabilities and other special needs. The project is based on the value of stakeholder ownership in…

  3. 78 FR 62455 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2013-0499; FRL-9901-35-Region3...: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to..., Associate Director, Office of Air Program Planning, Mailcode 3AP30, U.S. Environmental Protection Agency...

  4. 78 FR 57878 - Notice of Availability of the Proposed Bureau of Land Management Tres Rios Field Office and San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... and Resource Management Plan/Final Environmental Impact Statement AGENCY: Bureau of Land Management... Environmental Impact Statement (LRMP/Final EIS) for the San Juan Public Lands Planning Area in Colorado, and by... and woodlands; and other components of the biological, physical and cultural environment. Copies of...

  5. 77 FR 32022 - Direct Final Negative Declaration and Withdrawal of Large Municipal Waste Combustors State Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ... Negative Declaration and Withdrawal of Large Municipal Waste Combustors State Plan for Designated.... SUMMARY: EPA is taking direct final action to approve Illinois' negative declaration and request for EPA..., the state may submit a letter of certification to that effect, or a negative declaration, in lieu of a...

  6. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS, MODULE 3: SITE CHARACTERIZATION AND SAMPLING GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  7. 75 FR 6813 - Approval of Air Quality Implementation Plans; New Mexico; Albuquerque/Bernalillo County

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-11

    ...). ACTION: Direct final rule. SUMMARY: The EPA is approving revisions to the State Implementation Plan (SIP.... Background III. Summary of Changes to the New Mexico SIP IV. Final Action V. Statutory and Executive Order Reviews I. What Action Is EPA Taking? Today we are approving revisions to the New Mexico SIP, submitted by...

  8. 76 FR 62089 - General Management Plan/Abbreviated Final Environmental Impact Statement, New River Gorge...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... Impact Statement for the General Management Plan (GMP/EIS) for New River Gorge National River, West..., and interpretation of park resources over the next 20 years. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets...

  9. 78 FR 23588 - Final Supplementary Rules for the Morley Nelson Snake River Birds of Prey National Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Conservation Area (NCA), addressed in the September 2008 Resource Management Plan (RMP) and Record of Decision... an array of management actions designed to conserve natural and cultural resources on BLM... analysis can be found in Chapter 4 of the Proposed Resource Management Plan and Final Environmental Impact...

  10. Pathways to Practice. A Series of Final Reports on the SREB Nursing Curriculum Project.

    ERIC Educational Resources Information Center

    Haase, Patricia T.

    Five final reports on the Nursing Curriculum Project of the Southern Regional Education Board are presented. The reports include (1) RN (Registered Nursing) Education: The Basic Issues; (2) Types of RN Programs; (3) Planning and Operating an RN Program; (4) Acclimating the Novice Nurse: Whose Responsibility? and (5) Statewide Planning for Nursing.…

  11. Examination of the Locus of Positional Effects on Children's Production of Plural -"s": Considerations from Local and Global Speech Planning

    ERIC Educational Resources Information Center

    Theodore, Rachel M.; Demuth, Katherine; Shattuck-Hufnagel, Stefanie

    2015-01-01

    Purpose: Prosodic and articulatory factors influence children's production of inflectional morphemes. For example, plural -"s" is produced more reliably in utterance-final compared to utterance-medial position (i.e., the positional effect), which has been attributed to the increased planning time in utterance-final position. In previous…

  12. Factors influencing workplace health promotion intervention: a qualitative systematic review.

    PubMed

    Rojatz, Daniela; Merchant, Almas; Nitsch, Martina

    2017-10-01

    Although workplace health promotion (WHP) has evolved over the last 40 years, systematically collected knowledge on factors influencing the functioning of WHP is scarce. Therefore, a qualitative systematic literature review was carried out to systematically identify and synthesize factors influencing the phases of WHP interventions: needs assessment, planning, implementation and evaluation. Research evidence was identified by searching electronic databases (Scopus, PubMed, Social Sciences Citation Index, ASSIA, ERIC, IBBS and PsycINFO) from 1998 to 2013, as well as by cross-checking reference lists of included peer-reviewed articles. The inclusion criteria were: original empirical research, description of WHP, description of barriers to and/or facilitators of the planning, implementation and/or evaluation of WHP. Finally, 54 full texts were included. From these, influencing factors were extracted and summarized using thematic analysis. The majority of influencing factors referred to the implementation phase, few dealt with planning and/or evaluation and none with needs assessment. The influencing factors were condensed into topics with respect to factors at contextual level (e.g. economic crisis); factors at organizational level (e.g. management support); factors at intervention level (e.g. quality of intervention concept); factors at implementer level (e.g. resources); factors at participant level (e.g. commitment to intervention) and factors referring to methodological and data aspects (e.g. data-collection issues). Factors regarding contextual issues and organizational aspects were identified across three phases. Therefore, future research and practice should consider not only the influencing factors at different levels, but also at different phases of WHP interventions. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  13. Performance planning for rural planning organizations - final report.

    DOT National Transportation Integrated Search

    2017-02-01

    Recent federal rules place increased emphasis on performance-based management of the multimodal : transportation system and require the use of performance based methods in state, metropolitan, and : non-metropolitan transportation planning and progra...

  14. A new study of China's population control during the past ten years.

    PubMed

    Wei, J

    1989-02-01

    This paper summarizes the control of population in China in the past 10 years and the changes that are occurring. Recently, an increase in the number of family members has directly influenced socioeconomic status by increasing family income and improving living conditions. Rural families have no incentives to control the number of children born. The cyclic effect of the 1962-73 baby boom is also causing a recent surge in population. China has studied these problems and has taken the following measures: new family planning systems have been established; population has been controlled macroscopically and flexibility is allowed at an individual level; governmental family planning organizations have been set up and financed; family planning education has been increased; family planning services have been enforced; incentives and restrictions have been implemented. China must work as a whole to enact and enforce these policies. Families must show restraint in childbearing. The only way for this to be accomplished is by decreasing the socioeconomic incentives to have children. Finally, reforms should be in tune with changing situations.

  15. Final Report for Phase II Study: Prototyping the Sketch Planning Visualization Tool for Non-Motorized Travel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hwang, Ho-Ling; Wilson, Daniel W; Reuscher, Tim

    To further examine how factors such as those identified from the Phase I NMT study, and the modeling framework developed under that effort could be applied to local/regional level planning activities, FHWA decided to pursue a Phase II study. It was determined that a small geographic area with more detailed local data would be necessary. Although Washington D.C. was not one of the 2009 NHTS add-ons, it did conduct a household travel survey of 11,000 households in 2007-2008. The National Capital Region Transportation Planning Board at the Metropolitan Washington Council of Governments (MWCOG) conducted the household travel survey. The datamore » coverage under the MWCOG survey is much higher than that of the NHTS. As a part of the Phase II study, a prototype of a Geographic Information System (GIS)-based sketch planning visualization tool was also to be developed. The intent was to use a neighborhood in the Washington D.C. region as a case study for this prototype application.« less

  16. Understanding planning ability measured by the Tower of London: an evaluation of its internal structure by latent variable modeling.

    PubMed

    Koppenol-Gonzalez, Gabriela V; Bouwmeester, Samantha; Boonstra, A Marije

    2010-12-01

    The Tower of London (TOL) is a widely used instrument for assessing planning ability. Inhibition and (spatial) working memory are assumed to contribute to performance on the TOL, but findings about the relationship between these cognitive processes are often inconsistent. Moreover, the influence of specific properties of TOL problems on cognitive processes and difficulty level is often not taken into account. Furthermore, it may be expected that several planning strategies can be distinguished that cannot be extracted from the total score. In this study, a factor analysis and a latent class regression analysis were performed to address these issues. The results showed that 4 strategy groups that differed with respect to preplanning time could be distinguished. The effect of problem properties also differed for the 4 groups. Additional analyses showed that the groups differed on average planning performance but that there were no significant differences between inhibition and spatial working memory performance. Finally, it seemed that multiple factors influence performance on the TOL, the most important ones being the score measurements, the problem properties, and strategy use.

  17. Planning of visually guided reach-to-grasp movements: inference from reaction time and contingent negative variation (CNV).

    PubMed

    Zaepffel, Manuel; Brochier, Thomas

    2012-01-01

    We performed electroencephalogram (EEG) recording in a precuing task to investigate the planning processes of reach-to-grasp movements in human. In this reaction time (RT) task, subjects had to reach, grasp, and pull an object as fast as possible after a visual GO signal. We manipulated two parameters: the hand shape for grasping (precision grip or side grip) and the force required to pull the object (high or low). Three seconds before the GO onset, a cue provided advance information about force, grip, both parameters, or no information at all. EEG data show that reach-to-grasp movements generate differences in the topographic distribution of the late Contingent Negative Variation (ICNV) amplitude between the 4 precuing conditions. Along with RT data, it confirms that two distinct functional networks are involved with different time courses in the planning of grip and force. Finally, we outline the composite nature of the lCNV that might reflect both high- and low-level planning processes. Copyright © 2011 Society for Psychophysiological Research.

  18. Final Environmental Impact Report/Environmental Impact Statement. Cullinan Ranch Specific Plan. Chapter 13. Comments and Responses.

    DTIC Science & Technology

    1984-05-01

    energy- intensive crop, and agricultural advisors expect alfalfa prices to rise significantly in the future. Sonoma County Dairy Advisor Dr. Richard...Bermon Alfred Heller John Tuteur. Jr James D Hobbs* Volker E#1ee Sonoma County I. Michael Heyman Mrs Robert Watson Alemo County JunO Foote Marilyn...86 ,. Sunnyvale 5 571 Sonoma County 56 21,266 i Class C -- Little or no protection of diked baylands at local level Alameda County 1 228 Alameda 2 71

  19. Focused Feasibility Study Final Health and Safety Plan. Beach Point Test Site, Aberdeen Proving Ground, Edgewood Area, Maryland.

    DTIC Science & Technology

    1993-10-01

    brimmed hats can help prevent sunburn. Chronic exposure to UV radiation is known to cause skin cancer. In case of sunburn, do not apply burn ointment ...personnel who have the potential to be exposed to hazardous or toxic substances or environments during the course of field activities. Each member of the...investigations who are exposed or potentially exposed to hazardous substances or health hazards at or above the established exposure levels for these substances

  20. Design of a modular digital computer system DRL 4 and 5. [design of airborne/spaceborne computer system

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Design and development efforts for a spaceborne modular computer system are reported. An initial baseline description is followed by an interface design that includes definition of the overall system response to all classes of failure. Final versions for the register level designs for all module types were completed. Packaging, support and control executive software, including memory utilization estimates and design verification plan, were formalized to insure a soundly integrated design of the digital computer system.

  1. Final Remedial Investigation Sampling Plan Addendum. Milan Army Ammunition Plant Remedial Investigation Southern Study Area (Operable Unit No. 5)

    DTIC Science & Technology

    1997-09-01

    91-D-0012 Task Order No. 0007 2.4.7 Milan Army Ammunition Plant, Phytoremediation Pilot Study, USAEC, 1996 .. .............................. 2-28 2.5...indicated that heavy metal contamination (lead, chromium, and mercury ) was present at relatively low levels, and explosive contamination was limited to...and MI172 where lead was found at 22.9 j.g/1 and 18.4 Ig/l, respectively. 2.4.7 Milan Army Ammunition Plant, Phytoremediation Pilot Study, USAEC, 1996

  2. New transmission planning methodology for requesting proposals for wind generation

    NASA Astrophysics Data System (ADS)

    Isaacs, Andrew L.

    The increasing interest in renewable energy technologies during the last decade has caused conventional transmission and generation expansion planning methodologies to be strained and in some cases abandoned. This is due both to the quantity of generator interconnection requests and the constraints imposed by deregulated energy industry structures. One technique used to control the influx of renewable generation while maintaining competitive principles is a Request for Proposals (RFP). However, lack of transmission planning due to a disconnection between generation and transmission owners, difficulty in identifying viable projects, and high risk for proponents stand as obstacles to the goals of an RFP. This research proposes a procedure which minimizes the effect of these obstacles; meeting the purchaser requirements for low price and combining conventional planning concepts with feedback from competitive structures. The general features of the method include definition of generation limits and study area, expansion plan design, transmission cost evaluation, optimal selection of requested generation levels, and final selection of successful proponents. The method is shown to be effective in creating an RFP where proponents are well-informed and provided with cost certainty to reduce bid price, buyers are able to determine end costs of their energy, and good expansion planning principles are maintained. A case study using a real system in New Mexico demonstrates these concepts.

  3. The Consensus Plan: Dutchess Community College, 1984-85.

    ERIC Educational Resources Information Center

    Donsky, Aaron P.; And Others

    This 1984-85 Consensus Plan for Dutchess Community College is the result of a comprehensive planning process characterized by three elements: (1) a cycle of departmental input directed by a voluntary planning committee and finalized by the deans and president; (2) an integrated process in which departmental plans reflect the major thrusts…

  4. 75 FR 3680 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... the California State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION... Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These... are taking comments on this proposal and plan to follow with a final action. DATES: Any comments must...

  5. Patient Protection and Affordable Care Act; standards related to essential health benefits, actuarial value and accreditation. Final rule.

    PubMed

    2013-02-25

    This final rule sets forth standards for health insurance issuers consistent with title I of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. Specifically, this final rule outlines Exchange and issuer standards related to coverage of essential health benefits and actuarial value. This rule also finalizes a timeline for qualified health plans to be accredited in Federally-facilitated Exchanges and amends regulations providing an application process for the recognition of additional accrediting entities for purposes of certification of qualified health plans.

  6. Use of antimüllerian hormone to predict the menopausal transition in HIV-infected women

    PubMed Central

    Scherzer, Rebecca; Greenblatt, Ruth M.; Merhi, Zaher O.; Kassaye, Seble; Lambert-Messerlian, Geralyn; Maki, Pauline M.; Murphy, Kerry; Karim, Roksana; Bacchetti, Peter

    2016-01-01

    BACKGROUND HIV infection has been associated with early menopausal onset, which may have adverse long-term health consequences. Antimüllerian hormone, a biomarker of ovarian reserve and gonadal aging, is reduced in HIV-infected women. OBJECTIVE We sought to assess the relationship of antimüllerian hormone to age of menopause onset in HIV-infected women. STUDY DESIGN We used antimüllerian hormone levels measured in plasma in 2461 HIV-infected participants from the Women’s Interagency HIV Study to model the age at final menstrual period. Multivariable normal mixture models for censored data were used to identify factors associated with age at final menstrual period. RESULTS Higher antimüllerian hormone at age 40 years was associated with later age at final menstrual period, even after multivariable adjustment for smoking, CD4 cell count, plasma HIV RNA, hepatitis C infection, and history of clinical AIDS. Each doubling of antimüllerian hormone was associated with a 1.5-year increase in the age at final menstrual period. Median age at final menstrual period ranged from 45 years for those in the 10th percentile of antimüllerian hormone to 52 years for those in the 90th percentile. Other factors independently associated with earlier age at final menstrual period included smoking, hepatitis C infection, higher HIV RNA levels, and history of clinical AIDS. CONCLUSION Antimüllerian hormone is highly predictive of age at final menstrual period in HIV-infected women. Measuring antimüllerian hormone in HIV-infected women may enable clinicians to predict risk of early menopause, and potentially implement individualized treatment plans to prevent menopause-related comorbidities and to aid in interpretation of symptoms. PMID:27473002

  7. Standby gasoline rationing plan

    DOT National Transportation Integrated Search

    1980-06-01

    Title 10 - Energy, Chapter II - Department of Energy, PART 570 - Standby gasoline rationing plan regulations. Final rules adopted by the President for a Standby Gasoline Rationing Plan required by the Energy Policy and Conservation Act of 1979 (P.L. ...

  8. Groundwater quality assessment plan for single-shell waste management area B-BX-BY at the Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SM Narbutovskih

    2000-03-31

    Pacific Northwest National Laboratory conducted a first determination groundwater quality assessment at the Hanford Site. This work was performed for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement during the time period 1996--1998. The purpose of the assessment was to determine if waste from the Single-Shell Tank (SST) Waste Management Area (WMA) B-BX-BY had entered the groundwater at levels above the drinking water standards (DWS). The resulting assessment report documented evidence demonstrating that waste from the WMA has, most likely, impacted groundwater quality. Based on 40 CFR 265.93 [d] paragraph (7), themore » owner-operator must continue to make the minimum required determinations of contaminant level and of rate/extent of migrations on a quarterly basis until final facility closure. These continued determinations are required because the groundwater quality assessment was implemented prior to final closure of the facility.« less

  9. Mathematic model of regional economy development by the final result of labor resources

    NASA Astrophysics Data System (ADS)

    Zaitseva, Irina; Malafeev, Oleg; Strekopytov, Sergei; Bondarenko, Galina; Lovyannikov, Denis

    2018-04-01

    This article presents the mathematic model of regional economy development based on the result of labor resources. The solution of a region development-planning problem is considered for the period of long-lasting planning taking into account the beginning and the end of the planned period. The challenge is to find the distribution of investments in the main and additional branches of the regional economy, which will provide simultaneous transaction of all major sectors of the regional economy from the given condition to the predetermined final state.

  10. 76 FR 37207 - Group Health Plans and Health Insurance Issuers: Rules Relating to Internal Claims and Appeals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ...This document contains amendments to interim final regulations implementing the requirements regarding internal claims and appeals and external review processes for group health plans and health insurance coverage in the group and individual markets under provisions of the Affordable Care Act. These rules are intended to respond to feedback from a wide range of stakeholders on the interim final regulations and to assist plans and issuers in coming into full compliance with the law through an orderly and expeditious implementation process.

  11. Interactive web visualization tools to the results interpretation of a seismic risk study aimed at the emergency levels definition

    NASA Astrophysics Data System (ADS)

    Rivas-Medina, A.; Gutierrez, V.; Gaspar-Escribano, J. M.; Benito, B.

    2009-04-01

    Results of a seismic risk assessment study are often applied and interpreted by users unspecialised on the topic or lacking a scientific background. In this context, the availability of tools that help translating essentially scientific contents to broader audiences (such as decision makers or civil defence officials) as well as representing and managing results in a user-friendly fashion, are on indubitable value. On of such tools is the visualization tool VISOR-RISNA, a web tool developed within the RISNA project (financed by the Emergency Agency of Navarre, Spain) for regional seismic risk assessment of Navarre and the subsequent development of emergency plans. The RISNA study included seismic hazard evaluation, geotechnical characterization of soils, incorporation of site effects to expected ground motions, vulnerability distribution assessment and estimation of expected damage distributions for a 10% probability of exceedance in 50 years. The main goal of RISNA was the identification of higher risk area where focusing detailed, local-scale risk studies in the future and the corresponding urban emergency plans. A geographic information system was used to combine different information layers, generate tables of results and represent maps with partial and final results. The visualization tool VISOR-RISNA is intended to facilitate the interpretation and representation of the collection of results, with the ultimate purpose of defining actuation plans. A number of criteria for defining actuation priorities are proposed in this work. They are based on combinations of risk parameters resulting from the risk study (such as expected ground motion and damage and exposed population), as determined by risk assessment specialists. Although the values that these parameters take are a result of the risk study, their distribution in several classes depends on the intervals defined by decision takers or civil defense officials. These criteria provide a ranking of municipalities according to the expected actuation level and eventually, to alert levels. In this regard, the visualization tool constitutes an intuitive and useful tool that the end-user of the risk study may use to optimize and guide its application on emergency planning. The use of this type of tools can be adapted to other scenarios with different boundary conditions (seismicity level, vulnerability distribution) and user profiles (policy makers, stakeholders, students, general public) maintaining the same final goal: to improve the adaptation of the results of a scientific-technical work to the needs of other users with different backgrounds.

  12. 78 FR 2655 - Uinta-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ...-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project AGENCY: Forest Service, USDA. ACTION... prepare a supplement to the Ogden Travel Plan Revision Final Supplemental Environmental Impact Statement (FSEIS). The Ogden Travel Plan Revision FSEIS evaluated six alternatives for possible travel management...

  13. 78 FR 60099 - Nontank Vessel Response Plans and Other Response Plan Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Convention for the Prevention of Pollution From Ships MEPC Marine Environment Protection Committee NAICS... vessels to prepare and submit oil spill response plans. The Federal Water Pollution Control Act defines.... Additionally, this final rule updates the international Shipboard Oil Pollution Emergency Plan requirements...

  14. 78 FR 68005 - Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... this Federal Register, EPA is approving the State's implementation plan revision as a direct final rule...] Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP--Memorandum... proposing to approve a State Implementation Plan revision submitted by the Mississippi Department of...

  15. TRACON Aircraft Arrival Planning and Optimization Through Spatial Constraint Satisfaction

    NASA Technical Reports Server (NTRS)

    Bergh, Christopher P.; Krzeczowski, Kenneth J.; Davis, Thomas J.; Denery, Dallas G. (Technical Monitor)

    1995-01-01

    A new aircraft arrival planning and optimization algorithm has been incorporated into the Final Approach Spacing Tool (FAST) in the Center-TRACON Automation System (CTAS) developed at NASA-Ames Research Center. FAST simulations have been conducted over three years involving full-proficiency, level five air traffic controllers from around the United States. From these simulations an algorithm, called Spatial Constraint Satisfaction, has been designed, coded, undergone testing, and soon will begin field evaluation at the Dallas-Fort Worth and Denver International airport facilities. The purpose of this new design is an attempt to show that the generation of efficient and conflict free aircraft arrival plans at the runway does not guarantee an operationally acceptable arrival plan upstream from the runway -information encompassing the entire arrival airspace must be used in order to create an acceptable aircraft arrival plan. This new design includes functions available previously but additionally includes necessary representations of controller preferences and workload, operationally required amounts of extra separation, and integrates aircraft conflict resolution. As a result, the Spatial Constraint Satisfaction algorithm produces an optimized aircraft arrival plan that is more acceptable in terms of arrival procedures and air traffic controller workload. This paper discusses the current Air Traffic Control arrival planning procedures, previous work in this field, the design of the Spatial Constraint Satisfaction algorithm, and the results of recent evaluations of the algorithm.

  16. Determination of State Budgets for the Final Ozone Supplemental of the Transport Rule TSD

    EPA Pesticide Factsheets

    In this final rulemaking, EPA finalizes Federal Implementation Plans (FIPs) to address significant contribution to nonattainment and interference with maintenance in Iowa, Michigan, Missouri, Oklahoma, and Wisconsin.

  17. CSAPR Direct Final Rule (77 FR 10342)

    EPA Pesticide Factsheets

    EPA takes direct final action on additional revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals published August 8, 2011).

  18. 77 FR 54922 - Record of Decision for the General Management Plan/Final Environmental Impact Statement, Hampton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-06

    ...: Pursuant to 102 (2)(c) of the National Environmental Policy Act of 1969 (NEPA), the National Park Service (NPS) announces the availability of the Record of Decision for the Final General Management Plan and... to include the entire story of the park, from its beginnings in the 18th century to its heyday in the...

  19. 78 FR 28051 - Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed On or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ...This action finalizes amendments to the federal plan and the new source performance standards for hospital/medical/infectious waste incinerators. This final action implements national standards promulgated in the 2009 amendments to the hospital/medical/infectious waste incinerator emissions guidelines that will result in reductions in emissions of certain pollutants from all affected units.

  20. 77 FR 29682 - Gulf of Mexico, Outer Continental Shelf, Central Planning Area, Oil and Gas Lease Sale 216/222

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... and Gas Lease Sale: 2012 Central Planning Area (CPA) Lease Sale 216/222 Authority: This NOA is... a ROD following the completion of the Final SEIS for CPA Consolidated Lease Sale 216/222, the final... SEIS updates two previous environmental and socioeconomic analyses for CPA Lease Sale 216/222. The GOM...

  1. Task Analysis and Descriptions of Required Job Competencies for Robotics/Automated Systems Technicians. Final Report. Volume 2. Curriculum Planning Guide.

    ERIC Educational Resources Information Center

    Hull, Daniel M.; Lovett, James E.

    This volume of the final report for the Robotics/Automated Systems Technician (RAST) curriculum project is a curriculum planning guide intended for school administrators, faculty, and student counselors/advisors. It includes step-by-step procedures to help institutions evaluate their community's needs and their capabilities to meet these needs in…

  2. 76 FR 62824 - Notice of Final Supplementary Rules for Public Lands in Colorado: Bangs Canyon Special Recreation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... Management Area Management Plan (BCSRMAMP) and the Grand Junction Resource Management Plan (GJRMP). These... 43 U.S.C. 1740, 43 U.S.C. 315a, and 43 CFR 8365.1-6 II. Background Recreation resource management... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCON03000-L12200000-PA0000] Notice of Final...

  3. Optimizing decentralized production-distribution planning problem in a multi-period supply chain network under uncertainty

    NASA Astrophysics Data System (ADS)

    Nourifar, Raheleh; Mahdavi, Iraj; Mahdavi-Amiri, Nezam; Paydar, Mohammad Mahdi

    2017-09-01

    Decentralized supply chain management is found to be significantly relevant in today's competitive markets. Production and distribution planning is posed as an important optimization problem in supply chain networks. Here, we propose a multi-period decentralized supply chain network model with uncertainty. The imprecision related to uncertain parameters like demand and price of the final product is appropriated with stochastic and fuzzy numbers. We provide mathematical formulation of the problem as a bi-level mixed integer linear programming model. Due to problem's convolution, a structure to solve is developed that incorporates a novel heuristic algorithm based on Kth-best algorithm, fuzzy approach and chance constraint approach. Ultimately, a numerical example is constructed and worked through to demonstrate applicability of the optimization model. A sensitivity analysis is also made.

  4. Improving flood risk management through risk communication strategies

    NASA Astrophysics Data System (ADS)

    Bodoque, Jose Maria; Diez Herrero, Andres; Amerigo, Maria; Garcia, Juan Antonio; Olcina, Jorge; Cortes, Beatriz

    2016-04-01

    A suitable level of social perception about flood risk and awareness of Civil Protection Plans are critical to minimize disasters and damages due to flash floods. In order to improve risk perception, awareness and, as a result, the effectiveness of Civil Protection Plans, it is often required the implementation of communication plans. This research proposes a guide recommendation framework to enhance local population preparedness, prevention and response when a flash flood occurs. The research setting was a village (Navaluenga) located in Central Spain with 2,027 inhabitants. It is crossed by the Alberche river and Chorreron stream (both tributaries of the Tagus river), which are prone to flash floods. In a first phase, we assessed citizens' flash-flood risk perception and level of awareness regarding some key variables of the Civil Protection Plan. To this end, a questionnaire survey was designed and 254 adults, a sample representing roughly 12% of the population census, were interviewed. Responses were analysed, comparing awareness regarding preparedness and response actions with those previously defined in the Civil Protection Plan. In addition, we carried out a latent class cluster analysis aimed at identifying the different groups present among the respondents. Next, a risk communication plan was designed and implemented. It aimed to improve the understanding of flood risk among local people; and it comprises briefings, quiz-answers, contests of stories and flood images and intergenerational workshops. Finally, participants in the first phase were reached again and a new survey was performed. The results derived from these second questionnaires were statistically treated using the same approach of the first phase. Additionally, a t-test for paired samples and Pearson Chi-Square test was implemented in order to detect possible improvements in the perception and awareness. Preliminary results indicate that in Navaluenga there is a low social perception of flood risk and a low level of awareness regarding the Civil Protection Plan. In the social context of the Iberian Peninsula, where climate change models indicate an increase in extreme weather events and, consequently, high exposure and vulnerability to flash floods, the implementation of appropriately designed communication strategies is critical to improve the resilience of urban areas in order to cope with this risk.

  5. Formacion de Formadores en Planeamiento y Administracion de la Education: Informe Final. Reunion Tecnica de la Red REPLAD, Campinas, Sao Paulo, Brasil, 9-13 de noviembre de 1987. (Educational Development of Professionals in Educational Planning and Administration: Final Report. Proceedings of the Meeting of the Major Project for Education (Sao Paulo, Brazil, November 9-13, 1987).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Santiago (Chile). Regional Office for Education in Latin America and the Caribbean.

    This final report provides a synthesis of conference presentations by representatives from institutions in 17 Latin American and the Caribbean nations. The material includes descriptions about institutions of higher education planning and developing of their respective schools of education, ministries of education, and national and regional…

  6. Patient Protection and Affordable Care Act; establishment of exchanges and qualified health plans; Small Business Health Options Program. Final rule.

    PubMed

    2013-06-04

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act) related to the Small Business Health Options Program (SHOP). Specifically, this final rule amends existing regulations regarding triggering events and special enrollment periods for qualified employees and their dependents and implements a transitional policy regarding employees' choice of qualified health plans (QHPs) in the SHOP.

  7. 75 FR 34537 - Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... 45 CFR Part 147 Group Health Plans and Health Insurance Coverage Relating to Status as a... for Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan... group health plans and health insurance coverage in the group and individual markets under provisions of...

  8. Care Planning, Quality Assurance, and Personnel Management in Long-Term Care Facilities. Final Report.

    ERIC Educational Resources Information Center

    Patchner, Michael A.; Balgopal, Pallassana R.

    Three studies were undertaken to examine topics of care planning, personnel management, and quality assurance in long-term care facilities. The first study examined the formulation and implementation processes of care planning for nursing home residents. The exemplary homes' care planning included the existence of strong care planning leadership,…

  9. South Dakota ITS/CVO business plan : final business plan

    DOT National Transportation Integrated Search

    1998-01-18

    This report defines an Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) program for the State of South Dakota. Structured as a business plan, the document includes the following components: 1) description of the current CVO ...

  10. Freight planning support system : final summary report

    DOT National Transportation Integrated Search

    2003-07-01

    This report summarizes the activities and the findings of the Freight Planning Support System (FPSS) project conducted for the North Jersey Transportation Planning Authority (NJTPA). The underlying purpose of the project is to allow for better projec...

  11. Integrating climate change into the transportation planning process : final report

    DOT National Transportation Integrated Search

    2008-07-01

    The objective of this study is to advance the practice and application of transportation planning among state, regional, and local transportation planning agencies to successfully meet growing concerns about the relationship between transportation an...

  12. Graduate certificate in transportation planning : final report

    DOT National Transportation Integrated Search

    2008-12-12

    The purpose of this project was to develop and implement a graduate Certificate in Transportation Planning at Texas : A&M University. Texas A&M currently offers instruction in transportation through its Masters of Urban Planning and : Civil Engineeri...

  13. Employee Retirement Income Security Act of 1974: rules and regulations for administration and enforcement; claims procedure. Pension and Welfare Benefits Administration, Labor. Final regulation.

    PubMed

    2000-11-21

    This document contains a final regulation revising the minimum requirements for benefit claims procedures of employee benefit plans covered by Title I of the Employee Retirement Income Security Act of 1974 (ERISA or the Act). The regulation establishes new standards for the processing of claims under group health plans and plans providing disability benefits and further clarifies existing standards for all other employee benefit plans. The new standards are intended to ensure more timely benefit determinations, to improve access to information on which a benefit determination is made, and to assure that participants and beneficiaries will be afforded a full and fair review of denied claims. When effective, the regulation will affect participants and beneficiaries of employee benefit plans, employers who sponsor employee benefit plans, plan fiduciaries, and others who assist in the provision of plan benefits, such as third-party benefits administrators and health service providers or health maintenance organizations that provide benefits to participants and beneficiaries of employee benefit plans.

  14. Patient Protection and Affordable Care Act; HHS Notice of Benefit and Payment Parameters for 2018; Amendments to Special Enrollment Periods and the Consumer Operated and Oriented Plan Program. Final rule.

    PubMed

    2016-12-22

    This final rule sets forth payment parameters and provisions related to the risk adjustment program; cost-sharing parameters and cost-sharing reductions; and user fees for Federally-facilitated Exchanges and State-based Exchanges on the Federal platform. It also provides additional guidance relating to standardized options; qualified health plans; consumer assistance tools; network adequacy; the Small Business Health Options Programs; stand-alone dental plans; fair health insurance premiums; guaranteed availability and guaranteed renewability; the medical loss ratio program; eligibility and enrollment; appeals; consumer-operated and oriented plans; special enrollment periods; and other related topics.

  15. [Endodontically treated teeth. Success--failure. Endorestorative treatment plan].

    PubMed

    Zabalegui, B

    1990-01-01

    More and more often the general dentist is finding the presence of endodontically treated teeth during his treatment planning procedure. He has to ask himself if the endo-treated tooth functions and will continue to function function successfully, when deciding which final endo-restorative procedure to apply. For this reason the dentist or the endodontist with whom he works should clinically evaluate these teeth, establish a diagnostic criteria of their success or failure and a treatment plan according to the prognosis. The purpose of this article is to offer an organized clinical view of the steps to follow when evaluating an endodontically treated tooth and how to establish a final endo-restorative plan.

  16. 75 FR 55973 - Salvage and Marine Firefighting Requirements; Vessel Response Plans for Oil

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... and Marine Firefighting Requirements; Vessel Response Plans for Oil AGENCY: Coast Guard, DHS. ACTION... the vessel response plan salvage and marine firefighting requirements for tank vessels carrying oil... Marine Firefighting Requirements; Vessel Response Plans for Oil'' (73 FR 80618). The final rule amended...

  17. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  18. National Data Program for the Marine Environment Technical Development Plan. Final Report, Volume Two.

    ERIC Educational Resources Information Center

    System Development Corp., Santa Monica, CA.

    A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)

  19. 78 FR 78310 - Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... Federal Register, EPA is approving the State's implementation plan revision as a direct final rule without...] Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity Memorandum of... Implementation Plan submitted on July 12, 2013, through the North Carolina Department of Environment and Natural...

  20. Northrop TRIGA facility decommissioning plan versus actual results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gardner, F.W.

    1986-01-01

    This paper compares the TRIGA facility decontamination and decommissioning (D and D) plan to the actual results and discusses key areas where operational activities were impacted by the final US Nuclear Regulatory Commission approved D and D plan. A discussion of fuel transport, release criteria, and release survey plans is included.

  1. Review of the Draft 2014 Science Mission Directorate Science Plan

    NASA Technical Reports Server (NTRS)

    2013-01-01

    At the request of NASA's Science Mission Directorate (SMD), the National Research Council's (NRC's) Space Studies Board (SSB) initiated a study to review a draft of the SMD's 2014 Science Plan. The request for this review was made at a time when NASA is engaged in the final stages of a comprehensive, agency-wide effort to develop a new strategic plan and at a time when NASA's budget is under considerable stress. SMD's Science Plan serves to provide more detail on its four traditional science disciplines-astronomy and astrophysics, solar and space physics (also called heliophysics), planetary science, and Earth remote sensing and related activities-than is possible in the agency-wide Strategic Plan. In conducting its review of the draft Science Plan, the Committee on the Assessment of the NASA Science Mission Directorate 2014 Science Plan was charged to comment on the following specific areas: (1) Responsiveness to the NRC's guidance on key science issues and opportunities in recent NRC reports; (2) Attention to interdisciplinary aspects and overall scientific balance; (3) Identification and exposition of important opportunities for partnerships as well as education and public outreach; (4) Integration of technology development with the science program; (5) Clarity on how the plan aligns with SMD's strategic planning process; (6) General readability and clarity of presentation; and (7) Other relevant issues as determined by the committee. The main body of the report provides detailed findings and recommendations relating to the draft Science Plan. The highest-level, crosscutting issues are summarized here, and more detail is available in the main body of the report.

  2. 77 FR 2993 - Final Environmental Impact Statement and Record of Decision on Oncor Electric Delivery Company's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ...-FF02ENEH00] Final Environmental Impact Statement and Record of Decision on Oncor Electric Delivery Company's... the final environmental impact statement (EIS), and final record of decision under the National... implementation of the final Oncor Electric Delivery LLC's Habitat Conservation Plan (HCP). Our decision is to...

  3. Planning the Transition to Long-Term Stewardship for the River Corridor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cearlock, C.S.; Lerch, J.A.; Sands, J.P.

    2007-07-01

    Long-term stewardship refers to all activities necessary to ensure protection of human health and the environment following completion of remediation, disposal, or stabilization of a site or a portion of a site. Efforts to establish the proposed approach and criteria to be met for long-term stewardship in the river corridor of the Hanford Site in Richland, Washington, are currently being established and a draft plan is expected to be completed in mid-2007 to facilitate planning for a smooth and seamless transition to long-term stewardship. Once the initial criteria have been established, supporting information will be gathered as the work proceeds.more » Near the end of cleanup actions under the River Corridor Closure Contract, these criteria will be finalized in a long-term stewardship plan that documents how the criteria have been met. In addition, the final long-term stewardship plan will also contain a proposed Finding of Suitability to Transfer in accordance with Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Section 120(h) [1]. This final long-term stewardship plan will provide the foundation for post-River Corridor Closure Contract and management activities in the river corridor pending actual property transfer from the U.S. Department of Energy. (authors)« less

  4. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... include the value and size of the modification and the comparative value and size of the final product...

  5. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... minor include the value and size of the modification and the comparative value and size of the final...

  6. Miami Valley ITS : early deployment plan : final ITS strategic deployment plan

    DOT National Transportation Integrated Search

    1997-09-01

    This report presents the Strategic Deployment Plan for Intelligent Transportation Systems (ITS) in Clark, Greene, Miami and Montgomery Counties, Ohio (the Miami Valley). The report summarizes the steps that were performed in preparing the Strat...

  7. Evaluating the distributional effects of regional transportation plans and projects : final report.

    DOT National Transportation Integrated Search

    2017-05-01

    Metropolitan planning organizations (MPOs) have long been required to consider the equity implications of their regional transportation plans and processes. Funded by the National Institute for Transportation and Communities, this research aims to pr...

  8. Transit bus stop pedestrian warning application : acceptance test plan : final report.

    DOT National Transportation Integrated Search

    2016-10-14

    This document is the Acceptance Test Plan for the Transit Bus Stop Pedestrian Warning (TSPW) application. This report describes the test and demonstration plan to verify that the application meets its functional and performance requirements.

  9. Integrating intelligent transportation systems within the transportation planning process : an interim handbook.

    DOT National Transportation Integrated Search

    1998-01-01

    The Final Rule on Statewide Planning and Metropolitan Planning issued by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) in October, 1993 established revised and more comprehensive processes for metropolitan and sta...

  10. Metropolitan planning organizations in Texas : overview and profiles : final report.

    DOT National Transportation Integrated Search

    2017-04-01

    A metropolitan planning organization (MPO) has authority and responsibility for regional transportation planning in urbanized areas where the population is at least 50,000 and surrounding areas meet size/density criteria determined by the U.S. Census...

  11. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... Planning, Environmental Impact Analysis, and Decision- making), the NPS announces the availability of a... National Park Service will execute a Record of Decision (ROD) no sooner than 30 days following publication...

  12. Incentives for nondiscriminatory wellness programs in group health plans. Final rule.

    PubMed

    2013-06-03

    This document contains final regulations, consistent with the Affordable Care Act, regarding nondiscriminatory wellness programs in group health coverage. Specifically, these final regulations increase the maximum permissible reward under a health-contingent wellness program offered in connection with a group health plan (and any related health insurance coverage) from 20 percent to 30 percent of the cost of coverage. The final regulations further increase the maximum permissible reward to 50 percent for wellness programs designed to prevent or reduce tobacco use. These regulations also include other clarifications regarding the reasonable design of health-contingent wellness programs and the reasonable alternatives they must offer in order to avoid prohibited discrimination.

  13. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  14. Thai-Alberta Co-Operative Assessment Project Concerning Thirty-Two Rural Secondary Schools in the Third National Economic and Social Plan, Thailand (1972-1976). Final Report.

    ERIC Educational Resources Information Center

    Chareonchai, Ruang; And Others

    This extensive assessment project report focuses on the Rural Secondary Schools (RSS) Project in Thailand. The background, design, rationale and objectives of the assessment are described, as are the eight phases of the study: reconnaissance; proposals; basic planning and pre-testing; data collection; analysis; academic review; final report; and…

  15. Exposing ecological and economic costs of the research-implementation gap and compromises in decision making.

    PubMed

    Kareksela, Santtu; Moilanen, Atte; Ristaniemi, Olli; Välivaara, Reima; Kotiaho, Janne S

    2018-02-01

    The frequently discussed gap between conservation science and practice is manifest in the gap between spatial conservation prioritization plans and their implementation. We analyzed the research-implementation gap of one zoning case by comparing results of a spatial prioritization analysis aimed at avoiding ecological impact of peat mining in a regional zoning process with the final zoning plan. We examined the relatively complex planning process to determine the gaps among research, zoning, and decision making. We quantified the ecological costs of the differing trade-offs between ecological and socioeconomic factors included in the different zoning suggestions by comparing the landscape-level loss of ecological features (species occurrences, habitat area, etc.) between the different solutions for spatial allocation of peat mining. We also discussed with the scientists and planners the reasons for differing zoning suggestions. The implemented plan differed from the scientists suggestion in that its focus was individual ecological features rather than all the ecological features for which there were data; planners and decision makers considered effects of peat mining on areas not included in the prioritization analysis; zoning was not truly seen as a resource-allocation process and not emphasized in general minimizing ecological losses while satisfying economic needs (peat-mining potential); and decision makers based their prioritization of sites on site-level information showing high ecological value and on single legislative factors instead of finding a cost-effective landscape-level solution. We believe that if the zoning and decision-making processes are very complex, then the usefulness of science-based prioritization tools is likely to be reduced. Nevertheless, we found that high-end tools were useful in clearly exposing trade-offs between conservation and resource utilization. © 2017 Society for Conservation Biology.

  16. Promoting information sharing for multijurisdictional public health emergency preparedness.

    PubMed

    Grier, Nancy L; Homish, Gregory G; Rowe, Donald W; Barrick, Christopher

    2011-01-01

    The objective was to assess the planning needs of emergency management and public health professionals to provide a flexible and comprehensive planning tool. This study first assessed the needs of emergency management and public health professionals via an online survey. On the basis of results of the assessment, pertinent information was collected and organized into an online resource tool. The assessment was designed to address the needs of local, state, and federal government administrators working in emergency management and public health. The online tool was designed for use by any entity that functions to promote public health in the event of an emergency. Sixty-four participants completed the assessment survey. Seven states were represented. Most participants were senior-level administrators or management-level employees and were employed in public health, emergency, or bioterrorism preparedness, or in emergency medical services. Needs assessment for preparedness tools. The results of the survey identified a need for increased access to information (especially concerning liability issues and authority to enter into agreements) and high levels of interest in the availability of an online planning tool. The majority (80.7%) of respondents indicated an ability to locate and quantify resources within their own jurisdiction but only about half (42.9%) could do the same for resources outside of their jurisdiction. Finally, 71.9% reported having no assessment tool to measure emergency capacity and limitations. Planning for cross-border and multijurisdictional emergencies depends on access to pertinent information and the feasibility of attaining such information. The creation of a comprehensive guide to multijurisdictional collaborations, with its self-assessment checklists, can easily provide such information to emergency. In addition, information sharing and increased collaboration can lead to increased utilization of emergency preparedness best practices.

  17. Accelerated decomposition techniques for large discounted Markov decision processes

    NASA Astrophysics Data System (ADS)

    Larach, Abdelhadi; Chafik, S.; Daoui, C.

    2017-12-01

    Many hierarchical techniques to solve large Markov decision processes (MDPs) are based on the partition of the state space into strongly connected components (SCCs) that can be classified into some levels. In each level, smaller problems named restricted MDPs are solved, and then these partial solutions are combined to obtain the global solution. In this paper, we first propose a novel algorithm, which is a variant of Tarjan's algorithm that simultaneously finds the SCCs and their belonging levels. Second, a new definition of the restricted MDPs is presented to ameliorate some hierarchical solutions in discounted MDPs using value iteration (VI) algorithm based on a list of state-action successors. Finally, a robotic motion-planning example and the experiment results are presented to illustrate the benefit of the proposed decomposition algorithms.

  18. The current practice of using multiple representations in year 4 science classrooms

    NASA Astrophysics Data System (ADS)

    Chuenmanee, Chanoknat; Thathong, Kongsak

    2018-01-01

    Multiple representations have been widely used as a reasoning tool for understanding complex scientific concepts. Thus this study attempted to investigate the current practice of using multiple representations on Year 4 science classrooms in terms of modes and levels which appear in curriculum documents, teaching plans, tasks and assessments, teaching practices, and students' behaviors. Indeed, documentary analysis, classroom observation, and interview were used as the data collection methods. First of all, Year 4 science documents were analyzed. Then classroom observation was used as a collecting method to seek what actually happen in the classroom. Finally, in-depth interviews were used to gather more information and obtain meaningful data. The finding reveals that many modes of verbal, visual, and tactile representations within three levels of representations are posed in Year 4 documents. Moreover, according to classroom observations and interviews, there are three main points of applying multiple representations into classrooms. First of all, various modes of representations were used, however, a huge number of them did not come together with the levels. The levels of representations, secondly, macroscopic and cellular levels were introduced into all classrooms while symbolic level was provided only in some classrooms. Finally, the connection of modes and levels pointed out that modes of representations were used without the considerations on the levels of them. So, it seems to be that teaching practice did not meet the aims of curriculum. Therefore, these issues were being considered in order to organize and design the further science lessons.

  19. Comprehensive plan amendment impacts on interchanges in Oregon : final report.

    DOT National Transportation Integrated Search

    2005-09-01

    This report examines the effects of amendments to local comprehensive plans on interchange performance on the Oregon highway system. Plan amendments over a 15-year period in Oregon, resulting in changes to industrial or commercial land use, were revi...

  20. MnDOT Library strategic plan : final report.

    DOT National Transportation Integrated Search

    2017-06-01

    MnDOTs Senior Leadership asked MnDOT Library to develop a Strategic Plan that identifies and reviews the challenges facing the Library over the next five years to better address the evolving needs of the department and users. The strategic plan is...

  1. 78 FR 41694 - Final Priority and Requirements; Education Facilities Clearinghouse

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... the collection and dissemination of best practices for the planning, design, financing, procurement... Facilities Clearinghouse program is to provide technical assistance and training on the planning, design... dissemination of best practices for the planning, design, financing, procurement, construction, improvement...

  2. Retention of Knowledge in Clinical Biochemistry and the Effect of the Keller Plan.

    ERIC Educational Resources Information Center

    Schwartz, Peter L.

    1981-01-01

    A controlled trial of teaching clinical biochemistry by the Keller Plan at the University of Otago Medical School is described. The Keller Plan group performed significantly better than the control group on the final examination. (MLW)

  3. Interim guidance for implementing SAFETEA-LU provisions on planning, environment, and air quality for FHWA authorities

    DOT National Transportation Integrated Search

    2007-02-14

    This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...

  4. 33 CFR 385.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE... Restoration Plan (CERP) means the plan contained in the “Final Integrated Feasibility Report and Programmatic... subsequent modification authorized in law. Comprehensive Plan Modification Report means the report prepared...

  5. 33 CFR 385.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE... Restoration Plan (CERP) means the plan contained in the “Final Integrated Feasibility Report and Programmatic... subsequent modification authorized in law. Comprehensive Plan Modification Report means the report prepared...

  6. 33 CFR 385.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE... Restoration Plan (CERP) means the plan contained in the “Final Integrated Feasibility Report and Programmatic... subsequent modification authorized in law. Comprehensive Plan Modification Report means the report prepared...

  7. 78 FR 65962 - Revision of the Land Management Plan for the Flathead National Forest

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... over time. Under the 2012 Planning Rule, the assessment of ecological, social, and economic trends and... environmental impact statement and revised Forest Plan for public review and comment, and the preparation of the final environmental impact statement and revised Forest Plan. The third stage of the process is...

  8. 75 FR 21341 - Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... adoption of the RMP/GP. The Final EIS/EIR outlines the formulation and evaluation of alternatives designed...

  9. 76 FR 58807 - An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ...: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information-- Release of Final... Protection Planning can Incorporate Climate Change Information, (EPA/600/R-09/142F). The document was... goal of this report is to evaluate where land protection planning can incorporate climate change...

  10. Plan for the Class of 2000. Final Report of the Program Planning Committee.

    ERIC Educational Resources Information Center

    Wake Forest Univ., Winston Salem, NC.

    This report presents the comprehensive academic plan for undergraduate students to be phased in at Wake Forest University (North Carolina) beginning with the class entering in 1996. Four concepts are emphasized in the plan: (1) continued personalization and individualization of the professor-student relationship; (2) establishment of a first-year…

  11. 77 FR 1873 - Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ...] Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...

  12. 77 FR 12487 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Fine Particulate Matter 2002...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ...] Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...

  13. 77 FR 12724 - Approval and Promulgation of Implementation Plans; Georgia; Macon; Fine Particulate Matter 2002...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ...] Approval and Promulgation of Implementation Plans; Georgia; Macon; Fine Particulate Matter 2002 Base Year... is taking direct final action to approve the fine particulate matter (PM 2.5 ) 2002 base year... progress (RFP) plan, contingency measures, a 2002 base year emissions inventory and other planning SIP...

  14. Ten-year urban forestry action plan

    Treesearch

    J.W." Jerry" Van Sambeek

    2017-01-01

    The Ten-year Urban Forestry Action Plan: 2016-2026 was published in September, 2015 (see http://www.urbanforestry.subr.edu/FinalActionPlan_Complete_11_17_15.pdf). This 260 page heavily illustrated document was prepared by the National Urban and Community Forestry Advisory Council (NUCFAC) under leadership and funding from the USDA Forest Service. The Plan's...

  15. Making a successful transition to cash balance. Using employee choice and financial education.

    PubMed

    Scahill, P; Wiley, P

    2000-01-01

    As employee work patterns change, the need for flexible plan design has increased. Hybrid plans such as cash balance plans offer a plan design variation that incorporates elements of the traditional defined benefit plan as well as those of defined contribution plans. This article examines plan design trends and discusses both negative and positive reactions to those trends. Finally, the solution of offering choice to plan participants is suggested, and the issues that must be considered are discussed.

  16. Computer Aided Process Planning (CAPP): The User Interface for the Fabrication Module of the Rapid Design System

    DTIC Science & Technology

    1991-01-01

    plan. The Fabrication Planning Module automatically creates a plan using information from the Feature Based Design Environment (FBDE) of the RDS. It...llll By using the user Interface, the final process plan can be modified in many different ways. The translation of a design feature to a more...for the review and modification of a process plan. The Fabrication Planning Module automatically creates a plan using information from the Feature Based

  17. Vector-model-supported approach in prostate plan optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, Eva Sau Fan; Department of Health Technology and Informatics, The Hong Kong Polytechnic University; Wu, Vincent Wing Cheung

    Lengthy time consumed in traditional manual plan optimization can limit the use of step-and-shoot intensity-modulated radiotherapy/volumetric-modulated radiotherapy (S&S IMRT/VMAT). A vector model base, retrieving similar radiotherapy cases, was developed with respect to the structural and physiologic features extracted from the Digital Imaging and Communications in Medicine (DICOM) files. Planning parameters were retrieved from the selected similar reference case and applied to the test case to bypass the gradual adjustment of planning parameters. Therefore, the planning time spent on the traditional trial-and-error manual optimization approach in the beginning of optimization could be reduced. Each S&S IMRT/VMAT prostate reference database comprised 100more » previously treated cases. Prostate cases were replanned with both traditional optimization and vector-model-supported optimization based on the oncologists' clinical dose prescriptions. A total of 360 plans, which consisted of 30 cases of S&S IMRT, 30 cases of 1-arc VMAT, and 30 cases of 2-arc VMAT plans including first optimization and final optimization with/without vector-model-supported optimization, were compared using the 2-sided t-test and paired Wilcoxon signed rank test, with a significance level of 0.05 and a false discovery rate of less than 0.05. For S&S IMRT, 1-arc VMAT, and 2-arc VMAT prostate plans, there was a significant reduction in the planning time and iteration with vector-model-supported optimization by almost 50%. When the first optimization plans were compared, 2-arc VMAT prostate plans had better plan quality than 1-arc VMAT plans. The volume receiving 35 Gy in the femoral head for 2-arc VMAT plans was reduced with the vector-model-supported optimization compared with the traditional manual optimization approach. Otherwise, the quality of plans from both approaches was comparable. Vector-model-supported optimization was shown to offer much shortened planning time and iteration number without compromising the plan quality.« less

  18. 76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... power allocation. SUMMARY: The Western Area Power Administration (Western), a Federal power marketing..., Final Power Allocation developed under the requirements of subpart C-Power Marketing Initiative of the Energy Planning and Management Program (Program) Final Rule, 10 CFR part 905. These final power...

  19. 78 FR 13405 - Patient Protection and Affordable Care Act; Health Insurance Market Rules; Rate Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ...This final rule implements provisions related to fair health insurance premiums, guaranteed availability, guaranteed renewability, single risk pools, and catastrophic plans, consistent with title I of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. The final rule clarifies the approach used to enforce the applicable requirements of the Affordable Care Act with respect to health insurance issuers and group health plans that are non-federal governmental plans. This final rule also amends the standards for health insurance issuers and states regarding reporting, utilization, and collection of data under the federal rate review program, and revises the timeline for states to propose state- specific thresholds for review and approval by the Centers for Medicare & Medicaid Services (CMS).

  20. The PLAN score: a bedside prediction rule for death and severe disability following acute ischemic stroke.

    PubMed

    O'Donnell, Martin J; Fang, Jiming; D'Uva, Cami; Saposnik, Gustavo; Gould, Linda; McGrath, Emer; Kapral, Moira K

    2012-11-12

    We sought to develop and validate a simple clinical prediction rule for death and severe disability after acute ischemic stroke that can be used by general clinicians at the time of hospital admission. We analyzed data from a registry of 9847 patients (4943 in the derivation cohort and 4904 in the validation cohort) hospitalized with acute ischemic stroke and included in the Registry of the Canadian Stroke Network (July 1, 2003, to March 31, 2008; 11 regional stroke centers in Ontario, Canada). Outcome measures were 30-day and 1-year mortality and a modified Rankin score of 5 to 6 at discharge. Overall 30-day mortality was 11.5% (derivation cohort) and 13.5% (validation cohort). In the final multivariate model, we included 9 clinical variables that could be categorized as preadmission comorbidities (5 points for preadmission dependence [1.5], cancer [1.5], congestive heart failure [1.0], and atrial fibrillation [1.0]), level of consciousness (5 points for reduced level of consciousness), age (10 points, 1 point/decade), and neurologic focal deficit (5 points for significant/total weakness of the leg [2], weakness of the arm [2], and aphasia or neglect [1]). Maximum score is 25. In the validation cohort, the PLAN score (derived from preadmission comorbidities, level of consciousness, age, and neurologic deficit) predicted 30-day mortality (C statistic, 0.87), death or severe dependence at discharge (0.88), and 1-year mortality (0.84). The PLAN score also predicted favorable outcome (modified Rankin score, 0-2) at discharge (C statistic, 0.80). The PLAN clinical prediction rule identifies patients who will have a poor outcome after hospitalization for acute ischemic stroke. The score comprises clinical data available at the time of admission and may be determined by nonspecialist clinicians. Additional studies to independently validate the PLAN rule in different populations and settings are required.

  1. Physiological effects of a companion robot on blood pressure of older people in residential care facility: a pilot study.

    PubMed

    Robinson, Hayley; MacDonald, Bruce; Broadbent, Elizabeth

    2015-03-01

    To investigate the effects of interacting with the companion robot, Paro, on blood pressure and heart rate of older people in a residential care facility. This study used a repeated measures design. Twenty-one residents in rest home and hospital level care had their blood pressure taken three times; before, during and after interacting with the seal robot. Four residents who did not interact with the robot were excluded from the final analysis (final n = 17). The final analysis found that systolic and diastolic blood pressure changed significantly over time as did heart rate. Planned comparisons revealed that systolic and diastolic blood pressure decreased significantly from baseline to when residents had Paro (systolic, P = 0.048; diastolic, P = 0.05). Diastolic blood pressure increased significantly after Paro was withdrawn (P = 0.03). Interacting with Paro has a physiological effect on cardiovascular measures, which is similar to findings with live animals. © 2013 ACOTA.

  2. 78 FR 15011 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ..., Final EIS, DOE, TX, W.A. Parish Post-Combustion CO 2 Capture and Sequestration Project, Review Period.... 20130055, Final EIS, NPS, IA, Effigy Mounds National Monument Final General Management Plan, Review Period...] BILLING CODE 6560-50-P ...

  3. ActiveWV: a systematic approach to developing a physical activity plan for West Virginia.

    PubMed

    Elliott, Eloise; Jones, Emily; Bulger, Sean

    2014-03-01

    Modeled after the National Physical Activity Plan (NPAP), ActiveWV 2015: The West Virginia Physical Activity Plan was developed to provide strategic direction for physical activity promotion within the state. The purpose of this manuscript is to describe the systematic approach taken in developing ActiveWV. Plan development began with establishing capacity and leadership among key stakeholders representing all societal sectors. A multiphase, statewide decision-making process allowed for input across sectors and geographic regions. The process results identified five priority areas that served as the conceptual framework for ActiveWV. Sector teams, comprised of key organization stakeholders across the eight sectors, finalized the sector-specific strategies and tactics using the NPAP evidence-based recommendations, results from a formalized strategic process, and the teams' expertise and experience. ActiveWV was officially released on January 19, 2012 at the State Capitol in Charleston, West Virginia. Community events throughout the state surrounded the release and celebrated West Virginia Physical Activity Day. Ongoing implementation and dissemination efforts are underway at state and local levels. As the NPAP calls for states and communities to develop plans that meet the needs of their particular context, other states may find the lessons learned from West Virginia helpful in the development process.

  4. Integration Framework of Process Planning based on Resource Independent Operation Summary to Support Collaborative Manufacturing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kulvatunyou, Boonserm; Wysk, Richard A.; Cho, Hyunbo

    2004-06-01

    In today's global manufacturing environment, manufacturing functions are distributed as never before. Design, engineering, fabrication, and assembly of new products are done routinely in many different enterprises scattered around the world. Successful business transactions require the sharing of design and engineering data on an unprecedented scale. This paper describes a framework that facilitates the collaboration of engineering tasks, particularly process planning and analysis, to support such globalized manufacturing activities. The information models of data and the software components that integrate those information models are described. The integration framework uses an Integrated Product and Process Data (IPPD) representation called a Resourcemore » Independent Operation Summary (RIOS) to facilitate the communication of business and manufacturing requirements. Hierarchical process modeling, process planning decomposition and an augmented AND/OR directed graph are used in this representation. The Resource Specific Process Planning (RSPP) module assigns required equipment and tools, selects process parameters, and determines manufacturing costs based on two-level hierarchical RIOS data. The shop floor knowledge (resource and process knowledge) and a hybrid approach (heuristic and linear programming) to linearize the AND/OR graph provide the basis for the planning. Finally, a prototype system is developed and demonstrated with an exemplary part. Java and XML (Extensible Markup Language) are used to ensure software and information portability.« less

  5. Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-09-22

    This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...

  6. NOAA Gulf Spill Restoration |

    Science.gov Websites

    Plan, Focusing on Recreational Use and Nutrient Reduction Louisiana Trustees Release Fourth Draft Restoration Plan, Focusing on Recreational Use and Nutrient Reduction Read More... Florida Trustee Implementation Group Releases Phase V.2 Final Restoration Plan Florida Trustee Implementation Group Releases

  7. European Perceptions of Plan Colombia: A Virtual Contribution to a Virtual War and Peace Plan?

    DTIC Science & Technology

    2001-05-01

    government for more effective control of the paramilitary forces may help. A greater surge of European activism backed by development assistance funds and...economic, security, and political spillover effects for neighboring countries. Finally and logically, the author reflects the European concern that...economic, security, and political spillover effects for neighboring countries. Finally and logically, Roy reflects the European concern that whatever

  8. From Welfare to Work: Dynamic Lesson Plans for ESL Learners. Final Report. Fiscal Year 1998-99 [and] From Welfare to Work: Lessons for ESL Learners.

    ERIC Educational Resources Information Center

    Center for Literacy, Inc., Philadelphia, PA.

    This document combines a final project report and the resulting guidebook of 20 lesson plans for English as a second language (ESL) instructors to help learners work within the Temporary Assistance to Needy Families (TANF) system and acquire effective job readiness strategies, choose a career path, and pursue employment. The report describes the…

  9. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment

    PubMed Central

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S.; Phoon, Sin Ye

    2016-01-01

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively. PMID:27271840

  10. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment.

    PubMed

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S; Phoon, Sin Ye

    2016-06-07

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.

  11. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment

    NASA Astrophysics Data System (ADS)

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S.; Phoon, Sin Ye

    2016-06-01

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.

  12. Search Problems in Mission Planning and Navigation of Autonomous Aircraft. M.S. Thesis

    NASA Technical Reports Server (NTRS)

    Krozel, James A.

    1988-01-01

    An architecture for the control of an autonomous aircraft is presented. The architecture is a hierarchical system representing an anthropomorphic breakdown of the control problem into planner, navigator, and pilot systems. The planner system determines high level global plans from overall mission objectives. This abstract mission planning is investigated by focusing on the Traveling Salesman Problem with variations on local and global constraints. Tree search techniques are applied including the breadth first, depth first, and best first algorithms. The minimum-column and row entries for the Traveling Salesman Problem cost matrix provides a powerful heuristic to guide these search techniques. Mission planning subgoals are directed from the planner to the navigator for planning routes in mountainous terrain with threats. Terrain/threat information is abstracted into a graph of possible paths for which graph searches are performed. It is shown that paths can be well represented by a search graph based on the Voronoi diagram of points representing the vertices of mountain boundaries. A comparison of Dijkstra's dynamic programming algorithm and the A* graph search algorithm from artificial intelligence/operations research is performed for several navigation path planning examples. These examples illustrate paths that minimize a combination of distance and exposure to threats. Finally, the pilot system synthesizes the flight trajectory by creating the control commands to fly the aircraft.

  13. Final Environmental Planning Technical Report

    DTIC Science & Technology

    1984-01-01

    or mildly alkaline (pH 7.3 to 7.8). Soils with a pH of less than 6.3 have been found to be too acidic for bone preservation (Hole and Heizer 1965...230; Heizer and Graham 1967:125). On the other hand, a pH of 6.0 has been said to be the highest level tolerated by pollen (Moore and Webb 1978:15...however, this cutoff point may be as high as 7.0 in arid or semiarid climates (Hole and Heizer 1965:282). The generally dry, neutral, or alkaline soil

  14. Financing Maternal Health and Family Planning: Are We on the Right Track? Evidence from the Reproductive Health Subaccounts in Mexico, 2003–2012

    PubMed Central

    Aracena-Genao, Belkis; del Río-Zolezzi, Aurora

    2016-01-01

    Objective To analyze whether the changes observed in the level and distribution of resources for maternal health and family planning (MHFP) programs from 2003 to 2012 were consistent with the financial goals of the related policies. Materials and Methods A longitudinal descriptive analysis of the Mexican Reproductive Health Subaccounts 2003–2012 was performed by financing scheme and health function. Financing schemes included social security, government schemes, household out-of-pocket (OOP) payments, and private insurance plans. Functions were preventive care, including family planning, antenatal and puerperium health services, normal and cesarean deliveries, and treatment of complications. Changes in the financial imbalance indicators covered by MHFP policy were tracked: (a) public and OOP expenditures as percentages of total MHFP spending; (b) public expenditure per woman of reproductive age (WoRA, 15–49 years) by financing scheme; (c) public expenditure on treating complications as a percentage of preventive care; and (d) public expenditure on WoRA at state level. Statistical analyses of trends and distributions were performed. Results Public expenditure on government schemes grew by approximately 300%, and the financial imbalance between populations covered by social security and government schemes decreased. The financial burden on households declined, particularly among households without social security. Expenditure on preventive care grew by 16%, narrowing the financing gap between treatment of complications and preventive care. Finally, public expenditure per WoRA for government schemes nearly doubled at the state level, although considerable disparities persist. Conclusions Changes in the level and distribution of MHFP funding from 2003 to 2012 were consistent with the relevant policy goals. However, improving efficiency requires further analysis to ascertain the impact of investments on health outcomes. This, in turn, will require better financial data systems as a precondition for improving the monitoring and accountability functions in Mexico. PMID:26812646

  15. [The role of Sabin inactivated poliovirus vaccine in the final phase of global polio eradication].

    PubMed

    Dong, S Z; Zhu, W B

    2016-12-06

    Global polio eradication has entered its final phase, but still faces enormous challenges. The Polio Eradication and Endgame Strategic Plan (2013-2018) set the target for making the world polio-free by 2018. Meanwhile, the World Heath Organization Global Action Plan (GAP Ⅲ) recommended that polioviruses be stored under strict conditions after eradication of the wild poliovirus. At least one dose of inactivated poliovirus vaccine (IPV) would be required for each newborn baby in the world to ensure successful completion of the final strategy and GAP Ⅲ. The Sabin IPV has a high production safety and low production cost, compared with the wild-virus IPV and, therefore, can play an important role in the final stage of global polio eradication.

  16. Planning and design of PGIS in Shanghai sub-civic center

    NASA Astrophysics Data System (ADS)

    Zhang, Baoyu; Tao, Yan; Gao, Fei

    2011-10-01

    To alleviate the road congestion caused by parking in urban CBD, Parking Guidance and Information System (PGIS) is paid more attention to many cities in China. It can provide effective parking information (such as the location and utilization of parking lots, the routes, the traffic situation around the parking lots) to drivers through many ways, so as to guide them to park successfully. In the paper, PGIS constructing in Shanghai Xujiahui area is taken as the background, methods and models about urban PGIS planning and design are discussed from the angle of traffic function. Fuzzy AHP is used to select parking lots which can be brought into PGIS. The principle and method of zoning guidance service range are established, the principle of information classification and guidance method of three levels are introduced. Finally, the detailed content of PGI signs is given.

  17. A Mode of Combined ERP and KMS Knowledge Management System Construction

    NASA Astrophysics Data System (ADS)

    Yuena, Kang; Yangeng, Wen; Qun, Zhou

    The core of ERP and knowledge management is quite similar; both will send appropriate knowledge (goods, funds) to the right people (position) at the right time. It is reasonable to believe that increase the knowledge management system in ERP will help companies achieve their goals better. This paper compares the concept of logical point of hall three-dimensional structure of the knowledge management system and the ERP in methodology level. And found they are very similar in the time dimension, logic dimension and knowledge dimension. This laid the basis of methodology in the simultaneous planning, implementation and applications. And then proposed a knowledge-based ERP Multi-Agent Management System Model. Finally, the paper described the process from planning to implementation of knowledge management ERP system with multi-Agent interaction and impact from three concepts, management thinking, software and system.

  18. 76 FR 37037 - Requirements for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... Requirements for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and Appeals and... interim final regulations published July 23, 2010 with respect to group health plans and health insurance..., group health plans, and health insurance issuers providing group health insurance coverage. The text of...

  19. 12 CFR 563b.105 - What information must I include in my business plan?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... expectations, and industry norms, by the final year of the business plan. You must include three years of... proceeds, and the effect of this plan on management resources, staffing, and facilities. (4) The expertise of your management and board of directors, or that you have planned for adequate staffing and...

  20. Pension Plans at Risk: A Potential Hazard of Deficit Reduction and Tax Reform.

    ERIC Educational Resources Information Center

    Logue, Dennis E.

    The most widely used pension plans in the United States are defined-benefit plans under which employers pay workers a fixed pension, usually a percentage of their final salaries. Defined-contribution pension plans, under which employers and employees set aside funds that are invested for the employees, are growing in popularity and are…

  1. Computer integrated manufacturing/processing in the HPI. [Hydrocarbon Processing Industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yoshimura, J.S.

    1993-05-01

    Hydrocarbon Processing and Systemhouse Inc., developed a comprehensive survey on the status of computer integrated manufacturing/processing (CIM/CIP) targeted specifically to the unique requirements of the hydrocarbon processing industry. These types of surveys and other benchmarking techniques can be invaluable in assisting companies to maximize business benefits from technology investments. The survey was organized into 5 major areas: CIM/CIP planning, management perspective, functional applications, integration and technology infrastructure and trends. The CIM/CIP planning area dealt with the use and type of planning methods to plan, justify implement information technology projects. The management perspective section addressed management priorities, expenditure levels and implementationmore » barriers. The functional application area covered virtually all functional areas of organization and focused on the specific solutions and benefits in each of the functional areas. The integration section addressed the needs and integration status of the organization's functional areas. Finally, the technology infrastructure and trends section dealt with specific technologies in use as well as trends over the next three years. In February 1993, summary areas from preliminary results were presented at the 2nd International Conference on Productivity and Quality in the Hydrocarbon Processing Industry.« less

  2. Intermodal Freight Plan: The Goods Movement Element of the DVRPC Year 2020 Plan

    DOT National Transportation Integrated Search

    1995-06-01

    The focus of this plan is the twenty-three significant intermodal facilities in the Delaware Valley region where freight is exchanged between modes of transport en route to its final destination. A catalogue of these facilities and their supporting n...

  3. Development of an automated pre-sampling plan for construction projects : final report.

    DOT National Transportation Integrated Search

    1983-03-01

    The development of an automated pre-sampling plan was undertaken to free the district construction personnel from the cumbersome and time-consuming task of preparing such plans manually. A computer program was written and linked to a data file which ...

  4. Final report : sampling plan for pavement condition ratings of secondary roads.

    DOT National Transportation Integrated Search

    1984-01-01

    The purpose of this project was to develop a random sampling plan for use in selecting segments of the secondary highway system for evaluation under the Department's PMS. The plan developed is described here. It is a simple, workable, random sampling...

  5. 24 CFR 290.15 - Disposition plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.15 Disposition plan. (a) In general. Before disposing of a HUD-owned multifamily housing project, HUD will develop an initial and a final disposition plan...

  6. 24 CFR 290.15 - Disposition plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.15 Disposition plan. (a) In general. Before disposing of a HUD-owned multifamily housing project, HUD will develop an initial and a final disposition plan...

  7. 24 CFR 290.15 - Disposition plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... DEVELOPMENT HUD-OWNED PROPERTIES DISPOSITION OF MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.15 Disposition plan. (a) In general. Before disposing of a HUD-owned multifamily housing project, HUD will develop an initial and a final disposition plan...

  8. 15 CFR 990.55 - Restoration selection-developing restoration plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL... plan developed with opportunity for public review and comment. To meet this requirement, trustees must, at a minimum, develop a Draft and Final Restoration Plan, with an opportunity for public review of...

  9. 15 CFR 990.55 - Restoration selection-developing restoration plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OIL... plan developed with opportunity for public review and comment. To meet this requirement, trustees must, at a minimum, develop a Draft and Final Restoration Plan, with an opportunity for public review of...

  10. 77 FR 1717 - Notice of Availability; Draft Springfield Plateau Regional Restoration Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... Resources, have written a Draft Springfield Plateau Regional Restoration Plan and Environmental Assessment... Plateau ecoregion, and an environmental assessment, as required pursuant to the National Environmental... Springfield Plateau Regional Restoration Plan and Environmental Assessment will be finalized prior to...

  11. Linking Resource Decisions to Planning

    ERIC Educational Resources Information Center

    Saunders, Laura

    2014-01-01

    This chapter explores the relationship between strategic planning and budgeting. It describes how community college leaders can use strategic and foundational plans (academic, facilities, technology, and financial) to drive budgets and resource allocations in support of institutional goals and objectives. Finally, it identifies challenges of doing…

  12. 29 CFR 1952.374 - Final approval determination.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... plan does not cover private sector maritime employment; worksites located within Federal military... under the Federal program; to submit plan supplements in accordance with 29 CFR part 1953; to allocate..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.374...

  13. 29 CFR 1952.374 - Final approval determination.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... plan does not cover private sector maritime employment; worksites located within Federal military... under the Federal program; to submit plan supplements in accordance with 29 CFR part 1953; to allocate..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.374...

  14. 29 CFR 1952.374 - Final approval determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... plan does not cover private sector maritime employment; worksites located within Federal military... under the Federal program; to submit plan supplements in accordance with 29 CFR part 1953; to allocate..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.374...

  15. Fusion Simulation Program Definition. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cary, John R.

    2012-09-05

    We have completed our contributions to the Fusion Simulation Program Definition Project. Our contributions were in the overall planning with concentration in the definition of the area of Software Integration and Support. We contributed to the planning of multiple meetings, and we contributed to multiple planning documents.

  16. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    PubMed

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  17. Cultural Resources Management Plan: Coralville Lake, Iowa.

    DTIC Science & Technology

    1987-05-01

    7 iAlf now* E-* ILA’AUKEE -.WlSCCqSIN -. THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA - FINAL CULTURAL RESOURCES MANAGEMENT PLAN Prepared By...2004 In Fulfillment of: Contract No. DACW25-86-C-0036 May 1987 (A -P. 7V. V T This report entitled, "The Archaeology of Coralville Lake, Iowa - Final...various studies include survey, testing, and geomorphic investigations. "The Archaeology of Coralville Lake, Iowa - Landscape Evolution" presents the

  18. Planning for Multiagent Using ASP-Prolog

    NASA Astrophysics Data System (ADS)

    Son, Tran Cao; Pontelli, Enrico; Nguyen, Ngoc-Hieu

    This paper presents an Answer Set Programming based approach to multiagent planning. The proposed methodology extends the action language \\cal B in [12] to represent and reason about plans with cooperative actions of an individual agent operating in a multiagent environment. This language is used to formalize multiagent planning problems and the notion of a joint plan for multiagent in the presence of cooperative actions. Finally, the paper presents a system for computing joint plans based on the ASP-Prolog system.

  19. Planning oral health and clinical discharge in primary care: the comprehensive dental care protocol outcome.

    PubMed

    Cavalcanti, Yuri Wanderley; Dantas de Almeida, Leopoldina de Fátima; Barbosa, Ailma de Souza; Nascimento Padilha, Wilton Wilney

    2015-03-01

    The dental care must be driven by preventive and curative measures that can contribute to the population's oral health promotion. To evaluate the impact of the actions proposed by a comprehensive dental care protocol (CDCP) on the oral health condition of primary care users. The sample consisted of 32 volunteers, assisted throughout the six phases proposed by the CDCP: diagnosis of dental needs; resolution of urgencies; restorative interventions; application of promotional measures; evaluation of the achieved health level; and periodic controls. Data were collected through clinical exams, which measured the simplified oral hygiene index (OHI-S), gingival bleeding index (GBI) and the decayed, missing and filled teeth (DMFT) Index, before and after the CDCP was implemented. Statistical analysis consisted of the Wilcoxon test, at 5% significance level (α = 0.05). The OHI-S and GBI indices showed a significant reduction (p < 0.05) from the initial (1.4 ± 0.6 and 46.3 ± 19.9) to final condition (0.9 ± 0.3 and 21.5 ± 7.5). The decayed, missing and filled teeth and the missing teeth component were not significantly altered (p > 0.05), showing final values equal to 12.7 ± 9.6 and 5.6 ± 7.8, respectively. Decayed elements were fully converted into filled elements, and the final values of the decayed and filled elements were, respectively, 0.0 ± 0.0 and 7.3 ± 5.7 (p < 0.05). The enactment of the CDCP had a beneficial effect on the oral health of the population assisted by the dental services offered in primary care and this protocol seems to ft the public dental service demands. The CDCP can be useful to public dental service planning since it showed an efficient clinical outcome to the patients. We consider that this protocol should be employed in primary care oral health services in order to achieve overall upgrade, access enlargement and public oral health promotion.

  20. What is the Final Verification of Engineering Requirements?

    NASA Technical Reports Server (NTRS)

    Poole, Eric

    2010-01-01

    This slide presentation reviews the process of development through the final verification of engineering requirements. The definition of the requirements is driven by basic needs, and should be reviewed by both the supplier and the customer. All involved need to agree upon a formal requirements including changes to the original requirements document. After the requirements have ben developed, the engineering team begins to design the system. The final design is reviewed by other organizations. The final operational system must satisfy the original requirements, though many verifications should be performed during the process. The verification methods that are used are test, inspection, analysis and demonstration. The plan for verification should be created once the system requirements are documented. The plan should include assurances that every requirement is formally verified, that the methods and the responsible organizations are specified, and that the plan is reviewed by all parties. The options of having the engineering team involved in all phases of the development as opposed to having some other organization continue the process once the design has been complete is discussed.

  1. Final Rule: Extremely Hazardous Substance List and Threshold Planning Quantities; Emergency Planning and Release Notification Requirements (52 FR 13378)

    EPA Pesticide Factsheets

    April 22, 1987: This FR established the list of extremely hazardous substances (EHSs) and their threshold planning quantities (TPQs). Also codified reporting and notification requirements for facilities with EHS. Do not use for current compliance purposes.

  2. Connected Vehicle Pilot Deployment Program phase 1 : application deployment plan : New York City : final application deployment plan.

    DOT National Transportation Integrated Search

    2016-08-04

    This document is the Task 7 Application Deployment Plan deliverable for the New York City Connected Vehicle Pilot Deployment. It describes the process that the deployment team will follow to acquire and test the connected vehicle safety applications....

  3. 76 FR 59344 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland to establish transportation conformity regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a...

  4. Space transfer vehicle concepts and requirements study. Volume 2, book 3: STV system interfaces

    NASA Technical Reports Server (NTRS)

    Weber, Gary A.

    1991-01-01

    This report presents the results of systems analyses and conceptual design of space transfer vehicles (STV). The missions examined included piloted and unpiloted lunar outpost support and spacecraft servicing, and unpiloted payload delivery to various earth and solar orbits. The study goal was to examine the mission requirements and provide a decision data base for future programmatic development plans. The final lunar transfer vehicles provided a wide range of capabilities and interface requirements while maintaining a constant payload mission model. Launch vehicle and space station sensitivity was examined, with the final vehicles as point design covering the range of possible options. Development programs were defined and technology readiness levels for different options were determined. Volume 1 presents the executive summary, volume 2 provides the study results, and volume 3 the cost and WBS data.

  5. 78 FR 23708 - List of Fisheries for 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ...The National Marine Fisheries Service (NMFS) publishes its proposed List of Fisheries (LOF) for 2013, as required by the Marine Mammal Protection Act (MMPA). The proposed LOF for 2013 reflects new information on interactions between commercial fisheries and marine mammals. NMFS must classify each commercial fishery on the LOF into one of three categories under the MMPA based upon the level of serious injury and mortality of marine mammals that occurs incidental to each fishery. The classification of a fishery in the LOF determines whether participants in that fishery are subject to certain provisions of the MMPA, such as registration, observer coverage, and take reduction plan (TRP) requirements. The fishery classifications and list of marine mammal stocks incidentally injured or killed described in the Final LOF for 2012 remain in effect until the effective date of the Final LOF for 2013.

  6. 76 FR 23755 - Release of Draft Risk and Exposure Assessments and Final Integrated Review Plan for the National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-28

    ... titled, ``Ozone National Ambient Air Quality Standards: Scope and Methods Plan for Health Risk and... Standards: Scope and Methods Plan for Welfare Risk and Exposure Assessment'' (REA Plan for the secondary... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 50 and 58 [EPA-HQ-OAR-2008-0699; FRL-9300-4] RIN 2060...

  7. A Guide for Teaching Regional Environmental Planning. Final Report of Project - Inservice Personnel Development: Regional Environmental Planning Workshops for Tri-County Secondary School Teachers.

    ERIC Educational Resources Information Center

    Gallagher, James Joseph, Ed.

    This guide is designed for teachers, administrators, inservice leaders, and teacher educators. Its purpose is to provide an organizational framework, material, and resources for the development of instructional plans and strategies for incorporating regional environmental planning in the secondary school curriculum. The guide is divided into three…

  8. Newman Unit 1 advanced solar repowering advanced conceptual design. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-04-01

    The Newman Unit 1 solar repowering design is a water/steam central receiver concept supplying superheated steam. The work reported is to develop a refined baseline conceptual design that has potential for construction and operation by 1986, makes use of existing solar thermal technology, and provides the best economics for this application. Trade studies performed in the design effort are described, both for the conceptual design of the overall system and for the subsystem conceptual design. System-level functional requirements, design, operation, performance, cost, safety, environmental, institutional, and regulatory considerations are described. Subsystems described include the collector, receiver, fossil energy, electrical powermore » generating, and master control subsystems, site and site facilities. The conceptual design, cost, and performance of each subsystem is discussed at length. A detailed economic analysis of the repowered unit is made to realistically assess the economics of the first repowered unit using present cost data for a limited production level for solar hardware. Finally, a development plan is given, including the design, procurement, construction, checkout, startup, performance validation, and commercial operation. (LEW)« less

  9. Health, Environment and Social Management in Enterprises programme in the Republic of Macedonia.

    PubMed

    Karadzinska-Bislimovska, Jovanka; Baranski, Boguslaw; Risteska-Kuc, Snezana

    2004-01-01

    Macedonia is the first country in the region to launch implementation of the WHO Health, Environment and Social Management in Enterprises (HESME) Programme, following the WHO Ministerial Conference on Environment and Health held in London in 1999. The aim of this paper is to describe the efforts made to implement this programme. Methods are based on integrated management with joint involvement of crucial partners at all levels of activities suggested by the WHO. Commitment to inter-sectorial and interagency collaboration at national level, adoption of a final version of a National HESME Plan, with basic principles, criteria and concrete activities, establishment of a National coordination center for the HESME Project, development of training curricula and specific educational tools for occupational health personnel, preparation of questionnaires and procedures for a national survey to detect high occupational risks, specific occupational hazards and health promotion needs of the working population, and finally setting up quantitative and qualitative indicators for national or provincial workplace health profiles. Building up the concept of cooperation, partnership and common work in HESME activities is a challenge for the new public health view in Europe.

  10. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  11. Analysis of tsunami disaster map by Geographic Information System (GIS): Aceh Singkil-Indonesia

    NASA Astrophysics Data System (ADS)

    Farhan, A.; Akhyar, H.

    2017-02-01

    Tsunami risk map is used by stakeholder as a base to decide evacuation plan and evaluates from disaster. Aceh Singkil district of Aceh- Indonesia’s disaster maps have been developed and analyzed by using GIS tool. Overlay methods through algorithms are used to produce hazard map, vulnerability, capacity and finally created disaster risk map. Spatial maps are used topographic maps, administrative map, SRTM. The parameters are social, economic, physical environmental vulnerability, a level of exposed people, parameters of houses, public building, critical facilities, productive land, population density, sex ratio, poor ratio, disability ratio, age group ratio, the protected forest, natural forest, and mangrove forest. The results show high-risk tsunami disaster at nine villages; moderate levels are seventeen villages, and other villages are shown in the low level of tsunami risk disaster.

  12. Adaptation Strategies to Climate Change and the Role of Planning Instruments - The Example of the Dresden Region (Saxony/Germany)

    NASA Astrophysics Data System (ADS)

    Albrecht, J.; Juta, K.; Nobis, A.

    2009-04-01

    In the past, identifying anthropogenic influences on climate change, scenario analyses and issues of climate change mitigation were predominant approaches in climate change research (IPCC 2007). Currently, for instance in Germany, climate impact research on regional level comes to the forefront of research and policy making. Climate change has become an important topic on the agenda of politicians, administration and planning. In order to counteract the (unavoidable) climate change and its impacts it is necessary to develop adaptation strategies. At present, such strategies and guidelines are formulated on international, supranational and national level. The initial point was the United Nations Framework Convention on Climate Change in 1992 where the contracting states obligated themselves to develop national (and regional) programmes for adaptation. In 2007 the European Commission published its Green Paper called Adaptation to Climate Change in Europe. The paper states that adaptation efforts have to be intensified at different (spatial) levels (local, regional, national, and so forth). Furthermore, coordinating these efforts is of high importance. With the recent agreement on the German Adaptation Strategy to Climate Change (DAS 2008) in December 2008, federal government tries to accomplish this task. The German strategy mainly focuses on two elements: decreasing vulnerability and increasing adaptability. While the above mentioned strategies have presented information and policies concerning climate change and adaptation on international, supranational and national level, such documents dońt yet exist on regional level. However, because of their close link to the local level the regions are of high importance for adaptation strategies. Therefore, the Leibniz-Institute of Ecological and Regional Development developed a transdisciplinary project to formulate and implement the so-called Integrated Regional Climate Adaptation Programme (IRCAP) for the Model Region of Dresden (project REGKLAM). The REGKLAM-project is based on regionalised scenarios of climate change and includes measures of climate change adaptation to change for instance, urban form, infrastructure assets (e.g., reservoirs) and land use. Various institutions from politics, administration, economy, and research as well as civil society are involved in the project (the city of Dresden, several ministries and authorities of Saxony, the Dresden Chamber of Industry and Commerce and the University of Dresden). The IRCAP is planned to be an informal, cross-sectoral instrument of adaptation to climate change. As a regional programme, the IRCAP is addressed to decision-makers of the region of Dresden (defined, for instance, as planning region). Its function is to complement and coordinate existing instruments and measures. These instruments also include instruments of environmental and spatial planning on the regional level. Spatial and environmental planning can rely on a wide range of formal and informal instruments on different spatial, administrative, and sectoral levels, e.g. land use and landscape plans. Our contribution to the EGU conference aims to clear the role and relevance of the existing formal and informal planning instruments in the region of Dresden for the process of developing the IRCAP. Firstly, a survey is conducted for the purpose of identifying all relevant planning instruments. The identification process is based on specific criteria, for example: reference to the region, contents relating to the topic of climate change respectively climate adaptation. Secondly, the presentation argues for a selection of those planning instruments which seem to be most relevant for the process of developing an IRCAP. This selection process is based on specific criteria which include, for instance, complexity of expected effects, reference to regional and sectoral vulnerability, opportunity for future change of the existing planning instruments (e.g., current process of updating), interests of project partners and stakeholders. Thirdly, as a result, an overview of relevant planning instruments in the region of Dresden is shown, including their current status and statements about their relevance for the topic of climate adaptation strategies. Finally it is derived that this procedure provides a basis for the following possibilities: Adapting existing planning instruments, integrate contents of existing planning instruments in the IRCAP process, or develop and define new strategies or measures on the way to an IRCAP.

  13. Word Order and Voice Influence the Timing of Verb Planning in German Sentence Production.

    PubMed

    Sauppe, Sebastian

    2017-01-01

    Theories of incremental sentence production make different assumptions about when speakers encode information about described events and when verbs are selected, accordingly. An eye tracking experiment on German testing the predictions from linear and hierarchical incrementality about the timing of event encoding and verb planning is reported. In the experiment, participants described depictions of two-participant events with sentences that differed in voice and word order. Verb-medial active sentences and actives and passives with sentence-final verbs were compared. Linear incrementality predicts that sentences with verbs placed early differ from verb-final sentences because verbs are assumed to only be planned shortly before they are articulated. By contrast, hierarchical incrementality assumes that speakers start planning with relational encoding of the event. A weak version of hierarchical incrementality assumes that only the action is encoded at the outset of formulation and selection of lexical verbs only occurs shortly before they are articulated, leading to the prediction of different fixation patterns for verb-medial and verb-final sentences. A strong version of hierarchical incrementality predicts no differences between verb-medial and verb-final sentences because it assumes that verbs are always lexically selected early in the formulation process. Based on growth curve analyses of fixations to agent and patient characters in the described pictures, and the influence of character humanness and the lack of an influence of the visual salience of characters on speakers' choice of active or passive voice, the current results suggest that while verb planning does not necessarily occur early during formulation, speakers of German always create an event representation early.

  14. 75 FR 47826 - Final General Management Plan/Environmental Impact Statement, Cumberland Gap National Historical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ..., regulations, and policies and the purpose of the Cumberland Gap National Historical Park, the Final GMP/EIS... prescriptions to ensure protection, access and enjoyment of the park's resources. The Final GMP/EIS describes... Final GMP/EIS contains NPS responses to public comments on the Draft GMP/EIS, and copies of agency...

  15. Challenging behaviour: an action plan for education and training.

    PubMed

    Farrell, Gerald A; Salmon, Peter

    Nurses and other health care staff frequently encounter a range of aggressive and other 'challenging behaviours' at work from clients and colleagues. In response to staff concerns, an abundance of state and national policies are now available but it is left up to individual employers to decide how best to implement them at a local level. In this paper we offer an education and training model which is conceptually sound, practical in application, and suitable for health care staff at different levels in the organisation. The importance of understanding challenging behaviour from an interactional perspective, and the educational principles on which training should be founded, are discussed. Finally, the cost of training and the need for program evaluation are considered.

  16. Career Planning Support System Program (CPSS). Final Report.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    Intended for the developmental practitioner, this report examines literature produced by the Career Planning Support System dealing with career guidance in four major areas: minority youth; women; transition from school to work; and program planning and evaluation. The area of minority youth includes a review of literature on: educational and…

  17. 75 FR 39365 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... Implementation Plan, Imperial County Air Pollution Control District; Final Rule #0;#0;Federal Register / Vol. 75... Implementation Plan, Imperial County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA... the Imperial County Air Pollution Control District (ICAPCD or the District) portion of the California...

  18. 75 FR 64909 - Fiduciary Requirements for Disclosure in Participant-Directed Individual Account Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ...- related information in a form that encourages and facilitates a comparative review among a plan's... alternatives, and, specifically, how participants would react to the Model Comparative Chart for plan... regulation and Model Comparative Chart. Set forth below is an overview of the final regulations and a...

  19. Productivity Gainsharing--A Scanlon Overview.

    ERIC Educational Resources Information Center

    Kovac, James S.

    1986-01-01

    Provides an overview to an organization which is considering the initiation of a plan to share gains with its workers. Defines productivity, explains the benefits of improved productivity, examines a number of approaches to sharing productivity gains with workers, compares individual incentive plans with gain sharing plans, and finally, briefly,…

  20. 75 FR 69909 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... four revisions to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking... reached via electronic mail at [email protected] . SUPPLEMENTARY INFORMATION: In the final rules section...

  1. 75 FR 33688 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: Pension...

  2. 75 FR 12121 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: Pension...

  3. Model Special Education Manpower Information and Management System. Final Report.

    ERIC Educational Resources Information Center

    Gilles, Cynthia

    The Massachusetts Special Education Manpower Planning Project is described. Relying on cooperative planning, the project developed a system to provide information on manpower planning, a system to link other agencies with the project, and annual statements of state special education training priorities. The project also collaborated with six other…

  4. Swimming Pools. A Guide to Their Planning, Design and Operation.

    ERIC Educational Resources Information Center

    Gabrielsen, M. Alexander, Ed.

    Information is presented regarding all phases of swimming pool development and operation from earliest planning considerations to final programing. This comprehensive book covers--(1) the steps involved in planning a pool, (2) designing the pool, (3) water circulation, filtration, and treatment, (4) community pools, school and agency pools, and…

  5. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling... Memoranda; determination of final project boundaries; and preliminary real estate work to the point where... estate activities of the Corps are extremely sensitive, since they disrupt the lives of individuals and...

  6. The efficacy and utilisation of preoperative multiparametric magnetic resonance imaging in robot-assisted radical prostatectomy: does it change the surgical dissection plan?

    PubMed

    Tavukçu, Hasan Hüseyin; Aytaç, Ömer; Balcı, Numan Cem; Kulaksızoğlu, Haluk; Atuğ, Fatih

    2017-12-01

    We investigated the effect of the use of multiparametric prostate magnetic resonance imaging (mp-MRI) on the dissection plan of the neurovascular bundle and the oncological results of our patients who underwent robot-assisted radical prostatectomy. We prospectively evaluated 60 consecutive patients, including 30 patients who had (Group 1), and 30 patients who had not (Group 2) mp-MRI before robot-assisted radical prostatectomy. Based on the findings of mp-MRI, the dissection plan was changed as intrafascial, interfascial, and extrafascial in the mp-MRI group. Two groups were compared in terms of age, prostate-specific antigen (PSA), Gleason sum scores and surgical margin positivity. There was no statistically significant difference between the two groups in terms of age, PSA, biopsy Gleason score, final pathological Gleason score and surgical margin positivity. mp-MRI changed the initial surgical plan in 18 of 30 patients (60%) in Group 1. In seventeen of these patients (56%) surgical plan was changed from non-nerve sparing to interfascial nerve sparing plan. In one patient dissection plan was changed to non-nerve sparing technique which had extraprostatic extension on final pathology. Surgical margin positivity was similar in Groups 1, and 2 (16% and 13%, respectively) although, Group 1 had higher number of high- risk patients. mp-MRI confirmed the primary tumour localisation in the final pathology in 27 of of 30 patients (90%). Preoperative mp-MRI effected the decision to perform a nerve-sparing technique in 56% of the patients in our study; moreover, changing the dissection plan from non-nerve-sparing technique to a nerve sparing technique did not increase the rate of surgical margin positivity.

  7. Medicaid and Children's Health Insurance Programs: essential health benefits in alternative benefit plans, eligibility notices, fair hearing and appeal processes, and premiums and cost sharing; exchanges: eligibility and enrollment. Final rule.

    PubMed

    2013-07-15

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act. This final rule finalizes new Medicaid eligibility provisions; finalizes changes related to electronic Medicaid and the Children's Health Insurance Program (CHIP) eligibility notices and delegation of appeals; modernizes and streamlines existing Medicaid eligibility rules; revises CHIP rules relating to the substitution of coverage to improve the coordination of CHIP coverage with other coverage; and amends requirements for benchmark and benchmark-equivalent benefit packages consistent with sections 1937 of the Social Security Act (which we refer to as ``alternative benefit plans'') to ensure that these benefit packages include essential health benefits and meet certain other minimum standards. This rule also implements specific provisions including those related to authorized representatives, notices, and verification of eligibility for qualifying coverage in an eligible employer-sponsored plan for Affordable Insurance Exchanges. This rule also updates and simplifies the complex Medicaid premium and cost sharing requirements, to promote the most effective use of services, and to assist states in identifying cost sharing flexibilities. It includes transition policies for 2014 as applicable.

  8. Patient-specific positioning guides for total knee arthroplasty: no significant difference between final component alignment and pre-operative digital plan except for tibial rotation.

    PubMed

    Boonen, Bert; Schotanus, Martijn G M; Kerens, Bart; Hulsmans, Frans-Jan; Tuinebreijer, Wim E; Kort, Nanne P

    2017-09-01

    To assess whether there is a significant difference between the alignment of the individual femoral and tibial components (in the frontal, sagittal and horizontal planes) as calculated pre-operatively (digital plan) and the actually achieved alignment in vivo obtained with the use of patient-specific positioning guides (PSPGs) for TKA. It was hypothesised that there would be no difference between post-op implant position and pre-op digital plan. Twenty-six patients were included in this non-inferiority trial. Software permitted matching of the pre-operative MRI scan (and therefore calculated prosthesis position) to a pre-operative CT scan and then to a post-operative full-leg CT scan to determine deviations from pre-op planning in all three anatomical planes. For the femoral component, mean absolute deviations from planning were 1.8° (SD 1.3), 2.5° (SD 1.6) and 1.6° (SD 1.4) in the frontal, sagittal and transverse planes, respectively. For the tibial component, mean absolute deviations from planning were 1.7° (SD 1.2), 1.7° (SD 1.5) and 3.2° (SD 3.6) in the frontal, sagittal and transverse planes, respectively. Absolute mean deviation from planned mechanical axis was 1.9°. The a priori specified null hypothesis for equivalence testing: the difference from planning is >3 or <-3 was rejected for all comparisons except for the tibial transverse plane. PSPG was able to adequately reproduce the pre-op plan in all planes, except for the tibial rotation in the transverse plane. Possible explanations for outliers are discussed and highlight the importance for adequate training surgeons before they start using PSPG in their day-by-day practise. Prospective cohort study, Level II.

  9. Cost and Schedule Analytical Techniques Development: Option 2 Year

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the Option 2 Year from December 1, 1996 through November 30, 1997. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides products and deliverable in the form of models, data bases, methodologies, studies and analyses for the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) the Program Plans and Requirements Officer (PP02), and other user organizations. Detailed Monthly Progress reports were submitted to MSFC in accordance with the contract's Statement of Work, Section TV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at higher level. During this contract Option Year, SAIC expended 29,830 man-hours in tile performance of tasks called out in the Statement of Work and reported oil in this yearly Final Report. This represents approximately 16 full-time EPs. Included are the basis Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Chicago, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  10. Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents

    EPA Pesticide Factsheets

    final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).

  11. 77 FR 53179 - North Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    .... SUMMARY: The North Pacific Fishery Management Council's (NPFMC) Crab Plan Team (CPT) will meet in Seattle.... SUPPLEMENTARY INFORMATION: The Plan Team meeting agenda includes: Final stock assessments and harvest...

  12. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  13. Health care delivery in the future.

    PubMed

    Harnar, R

    1983-01-01

    India's health care system, despite several significant achievements, suffers from some weaknesses and deficiencies. There has been a preoccupation with the promotion of curative and clinical services through city based hospitals which have essentially catered to certain sections of the urban population. The concept of health in its totality, with preventive and promotive health care services in addition to the curative, has yet to be made operational. There has been an overdependence on the states for health care measures and voluntary and local effort has not been able to accept responsibility in any significant way. The involvement of the people in solving their health problems has been almost nonexistent. Health needs to be viewed as part of the strategy of human resources development. Horizontal and vertical linkages must be obtained among all the interrelated programs--protected water supply environmental sanitation and hygiene, nutrition, education, family planning, and maternal and child welfare. Only with such linkages can the benefits of the various programs be optimized. An attack on the problems of diseases cannot be completely successful unless it is accompanied by an attack on poverty. For this reason the 6th plan assigns a high priority to programs of promotion, or gainful employment, eradication of poverty, population control, and meeting the basic human needs of the population. The Alma Alta Declaration of 1977 has become the accepted health policy of India, simplified into the slogan "health for all by 2000." To realize this goaL, the Planning Commission recommends in the 6th 5-Year Plan a restructing and reorientation of the country's health services. The proposed alternative scheme is more decentralized and provides for many more people to be trained at the grassroots level. People would be involved in tackling their health problems and community participation would be encouraged. Finally, the alternative strongly urges the screening of patients at each level. The 6th plan has incorporated some ideas, and it is hoped that more will be accepted in the next plans.

  14. CSAPR June Revisions Rule (77 FR 34830)

    EPA Pesticide Factsheets

    EPA takes final action on revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals, published August 8, 2011).

  15. A Planning Study for the Conversion of Recorded Books and Magazines from Rigid Discs to Cassettes and Flexible Discs. Final Report.

    ERIC Educational Resources Information Center

    Innovative Systems Research, Inc., Pennsauken, NJ.

    Twelve different conversion plans were delineated and evaluated in the performance of this study effort. An indepth technical, financial, and cost/benefit analysis was included. One plan was determined to be distinctively more cost-effective than any of the other plans because it provided a technically feasible system that assured the maximum…

  16. Northrop Triga facility decommissioning plan versus actual results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gardner, F.W.

    1986-01-01

    This paper compares the Triga facility decontamination and decommissioning plan to the actual results and discusses key areas where operational activities were impacted upon by the final US Nuclear Regulatory Commission (NRC)-approved decontamination and decommissioning plan. Total exposures for fuel transfer were a factor of 4 less than planned. The design of the Triga reactor components allowed the majority of the components to be unconditionally released.

  17. Space Solar Power Program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arif, Humayun; Barbosa, Hugo; Bardet, Christophe

    1992-08-01

    Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.

  18. 77 FR 51044 - Cabo Rojo National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... the human environment, which we included in the draft comprehensive conservation plan and... observation, wildlife photography, environmental education, and interpretation; bicycling, hiking, walking...

  19. [Application of digital design of orthodontic-prosthodontic multidisciplinary treatment plan in esthetic rehabilitation of anterior teeth].

    PubMed

    Liu, Y S; Li, Z; Zhao, Y J; Ye, H Q; Zhou, Y Q; Hu, W J; Liu, Y S; Xun, C L; Zhou, Y S

    2018-02-18

    To develop a digital workflow of orthodontic-prosthodontic multidisciplinary treatment plan which can be applied in complicated anterior teeth esthetic rehabilitation, in order to enhance the efficiency of communication between dentists and patients, and improve the predictability of treatment outcome. Twenty patients with the potential needs of orthodontic-prosthodontic multidisciplinary treatment to solve their complicated esthetic problems in anterior teeth were recruited in this study. Digital models of patients' both dental arches and soft tissues were captured using intra oral scanner. Direct prosthodontic (DP) treatment plan and orthodontic-prosthodontic (OP) treatment plan were carried out for each patient. For DP treatment plans, digital wax-up models were directly designed on original digital models using prosthodontic design system. For OP treatment plans, virtual-setups were performed using orthodontic analyze system according to orthodontic and esthetic criteria and imported to prosthodontic design system to finalize the digital wax-up models. These two treatment plans were shown to the patients and demonstrated elaborately. Each patient rated two treatment plans using visual analogue scales and the medians of scores of two treatment plans were analyzed using signed Wilcoxon test. Having taken into consideration various related factors, including time, costs of treatment, each patient chose a specific treatment plan. For the patients chose DP treatment plans, digital wax-up models were exported and printed into resin diagnostic models which would be utilized in the prosthodontic treatment process. For the patients chose OP treatment plans, virtual-setups were used to fabricate aligners or indirect bonding templates and digital wax-up models were also exported and printed into resin diagnostic models for prosthodontic treatment after orthodontic treatment completed. The medians of scores of DP treatment plan and OP treatment plan were calculated and analyzed by IBM SPSS 20. The median of scores of DP treatment plan was 8.4, the minimum value was 6.9 and the maximum value was 9.3. The median of scores of OP treatment plan was 9.0, the minimum value was 7.9 and the maximum value was 9.6. The median of scores of OP was significantly higher than that of DP (Z=-3.23, P<0.01). Finally, 12 patients chose OP treatment plans and 8 patients chose DP treatment plans. For cases with complex esthetic problems in anterior teeth, a digital workflow can demonstrate final treatment outcome and help patients make suitable treatment decisions. In our study, the orthodontic-prosthodontic multidisciplinary treatment plan is feasible which can provide predictions of treatment outcome and improve esthetic outcome with patients' satisfaction.

  20. Application of Jason-2/3 Altimetry for Virtual Gauging and Flood Forecasting in Mekong Basin

    NASA Astrophysics Data System (ADS)

    Lee, H.; Hossain, F.; Okeowo, M. A.; Nguyen, L. D.; Bui, D. D.; Chang, C. H.

    2016-12-01

    Vietnam suffers from both flood and drought during the rainy and dry seasons, respectively, due to its highly varying surface water resources. However, the National Center for Water Resources Planning and Investigation (NAWAPI) states that only 7 surface water monitoring stations have been constructed in Central and Highland Central regions with 100 station planned to be constructed by 2030 throughout Vietnam. For the Mekong Delta (MD), the Mekong River Commission (MRC) provides 7-day river level forecasting, but only at the two gauge stations located near the border between Cambodia and Vietnam (http://ffw.mrcmekong.org/south.htm). In order to help stakeholder agencies monitor upstream processes in the rivers and manage their impacts on the agricultural sector and densely populated delta cities, we, first of all, construct the so-called virtual stations throughout the entire Mekong River using the fully automated river level extraction tool with Jason-2/3 Geophysical Research Record (GDR) data. Then, we discuss the potentials and challenges of river level forecasting using Jason-2/3 Interim GDR (IGDR) data, which has 1 - 2 days of latency, over the Mekong River. Finally, based on our analyses, we propose a forecasting system for the Mekong River by drawing from our experience in operationalizing Jason-2 altimetry for Bangladesh flood forecasting.

Top