2014-05-01
There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.
1993-08-01
pricing and sales, order processing , and purchasing. The class of manufacturing planning functions include aggregate production planning, materials...level. I Depending on the application, each control level will have a number of functions associated with it. For instance, order processing , purchasing...include accounting, sales forecasting, product costing, pricing and sales, order processing , and purchasing. The class of manufacturing planning functions
To Plan or Not to Plan, That Is the Question
ERIC Educational Resources Information Center
Dolph, David A.
2016-01-01
Strategic planning is a process utilized by numerous organizations, including K-12 school boards, intent on improvement and reform. A thoughtful strategic planning process can help develop a board's desired future driven by goals and strategies aimed at progress. However, improvement processes such as strategic planning are challenging. In fact,…
Planning as an Iterative Process
NASA Technical Reports Server (NTRS)
Smith, David E.
2012-01-01
Activity planning for missions such as the Mars Exploration Rover mission presents many technical challenges, including oversubscription, consideration of time, concurrency, resources, preferences, and uncertainty. These challenges have all been addressed by the research community to varying degrees, but significant technical hurdles still remain. In addition, the integration of these capabilities into a single planning engine remains largely unaddressed. However, I argue that there is a deeper set of issues that needs to be considered namely the integration of planning into an iterative process that begins before the goals, objectives, and preferences are fully defined. This introduces a number of technical challenges for planning, including the ability to more naturally specify and utilize constraints on the planning process, the ability to generate multiple qualitatively different plans, and the ability to provide deep explanation of plans.
NASA Technical Reports Server (NTRS)
Sapp, T. P.; Davin, D. E.
1977-01-01
The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.
Kennedy Space Center Orion Processing Team Planning for Ground Operations
NASA Technical Reports Server (NTRS)
Letchworth, Gary; Schlierf, Roland
2011-01-01
Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis
DOT National Transportation Integrated Search
2009-04-01
The Wilmington Area Planning Council takes an objectives-driven, performance-based approach to its metropolitan transportation planning, including paying special attention to integrating its Congestion Management Process into its planning efforts. Th...
Strategic planning in a complex academic environment: lessons from one academic health center.
Levinson, Wendy; Axler, Helena
2007-08-01
Leaders in academic health centers (AHCs) must create a vision for their academic unit embedded in a complex environment. A formal strategic planning process can be valuable to help shape a clear vision taking advantage of potential collaborations and to develop specific achievable long- and short-term goals. The authors describe the steps in a formal strategic planning process and illustrate it with the example of the Department of Medicine at the University of Toronto Faculty of Medicine beginning in 2004. The process included the active participation of over 300 faculty members, trainees, and stakeholders of the department and resulted in broad-based support and leadership for the resulting plan. The authors describe the steps, which include getting started, committing to planning principles, establishing the work plan, understanding the environment, pulling it all together, shaping the vision, testing strategic directions, building effective implementation, and promoting the plan. Articulation of vision, mission, and values informed the plan's development, as well as 10 key principles integral to the plan. Challenges and lessons learned are also described. The final strategic plan is an active core activity of the department, guiding decisions and resource allocation and facilitating measurement of success or shortcomings. The process the authors describe is applicable to multiple academic units, including divisions/sections, departments, or thematic programs in AHCs.
Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition
NASA Astrophysics Data System (ADS)
Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly
2018-04-01
Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.
Not planning a sustainable transport system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Finnveden, Göran, E-mail: goran.finnveden@abe.kth.se; Åkerman, Jonas
2014-04-01
The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 2010–2021, and the planning of Bypass Stockholm, a major road investment.more » Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: • Two cases are studied to analyse if current planning supports a sustainable transport system. • Results show that the plans are in conflict with several of the environmental quality objectives. • Long-term climate goals are not included in the planning processes. • Current practices do not contribute to a sustainable planning processes. • Methodology and process for environmental assessments must be further developed and discussed.« less
Neal-Schuman Electronic Classroom Handbook.
ERIC Educational Resources Information Center
Hinchliffe, Lisa Janicke
This book discusses planning, designing, and implementing electronic classrooms. Chapters cover: (1) background, including the definition of electronic classrooms, classroom types, and justifications; (2) planning, including planners and the planning process; (3) gathering and analyzing information, including instructional needs assessment,…
76 FR 22648 - Resolution Plans and Credit Exposure Reports Required
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
..., including associated services, functions and support that, in the view of the Covered Company or as jointly...-based Covered Company's overall contingency planning process, and information regarding the.... operations be linked to the contingency planning process of the foreign-based Covered Company? Process 1. Are...
The California general plan process and sustainable transportation planning
DOT National Transportation Integrated Search
2002-05-01
This research project assesses California's General Plan process as a tool for implementing sustainable development, with particular emphasis on transportation systems at the local level, including the relationship of local transportation systems to ...
ERIC Educational Resources Information Center
Galligani, Dennis J.
This first volume of the University of California, Irvine, (UCI) Student Affirmative Action (SAA) Five-Year Plan provides an overview of the plan and the planning process, lists campus SAA goals and objectives, summarizes campus SAA activities, and describes the research and evaluation components of the plan. Topics include: the historical context…
Handbook for Educational Buildings Planning. Educational Building and Equipment 9.
ERIC Educational Resources Information Center
Almeida, Rodolfo
Stages in the educational facility planning process are presented in this handbook, with a second focus on implementation. Four chapters provide information on the four cycles of the planning process, which include analysis and diagnosis, research and development, planning and programming, and implementation and evaluation. Characteristics of an…
A Guide to Program Planning Vol. II.
ERIC Educational Resources Information Center
Allen, Earl, Sr.
This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…
Information technology strategic planning: art or science?
Hutsell, Richard; Mancini-Newell, Lulcy
2005-01-01
It had been almost a decade since the hospitals that make up the Daughters of Charity Health System (DCHS) had engaged in a formal information technology strategic planning process. In the summer of 2002, as the health system re-formed, there was a unique opportunity to introduce a planning process that reflected the governance style of the new health system. DCHS embarked on this journey, with the CIO initiating and formally sponsoring the information technology strategic planning process in a dynamic and collaborative manner The system sought to develop a plan tailored to encompass both enterprise-wide and local requirements; to develop a governance model to engage the members of the local health ministries in plan development, both now and in the future; and to conduct the process in a manner that reflected the values of the Daughters of Charity. The DCHS CIO outlined a premise that the CIO would guide and be continuously involved in the development of this tailored process, in conjunction with an external resource. Together, there would be joint responsibility for introducing a flexible information technology strategic planning methodology; providing an education on the current state of healthcare IT, including future trends and success factors; facilitating support to tap into existing internal talent; cultivating a collaborative process to support both current requirements and future vision; and developing a well-functioning governance structure that would enable the plan to evolve and reflect user community requirements. This article highlights the planning process, including the lessons learned, the benchmarking during and in post-planning, and finally, but most importantly, the unexpected benefit that resulted from this planning process.
The California general plan process and sustainable transportation planning
DOT National Transportation Integrated Search
2001-11-01
This study reviewed the current and potential utility of California's General Plan process as a tool for promoting more sustainable local transportation systems The study used multiple methods to investigate this issue, including: 1. An extensive lit...
Using community-based evidence for decentralized health planning: insights from Maharashtra, India.
Shukla, Abhay; Khanna, Renu; Jadhav, Nitin
2018-01-01
Health planning is generally considered a technical subject, primarily the domain of health officials with minimal involvement of community representatives. The National Rural Health Mission launched in India in 2005 recognized this gap and mandated mechanisms for decentralized health planning. However, since planning develops in the context of highly unequal power relations, formal spaces for participation are necessary but not sufficient. Hence a project on capacity building for decentralized health planning was implemented in selected districts of Maharashtra, India during 2010-13. This process developed on the platform of officially supported community-based monitoring and planning, a process for community feedback and participation towards health system change. A specific project on capacity building for decentralized planning included a structured learning course and workshops for major stakeholders. An evaluation of the project, including in-depth interviews of various participants and analysis of change in local health planning processes, revealed positive changes in intervention areas, including increased capacity of key stakeholders leading to preparation of evidence-based, innovative planning proposals, significant community oriented changes in utilization of health facility funds, and inclusion of community-based proposals in village, health facility-based block and district plans. Transparency related to planning increased along with responsiveness of health providers to community suggestions. A key lesson is that active facilitation of decentralized health planning and influencing the health system to expand participation, are essential to ensure changes in planning. Effective strategies included: identifying people's health service related priorities through community-based monitoring, capacity building of diverse stakeholders regarding local health planning, and advocacy to enable participation of community-based actors in the planning process. This combination of strategies draws upon the framework of 'empowered participatory governance' which necessitates combining a degree of 'countervailing power' and acceptance of participation by the system, for new forms of governance to emerge. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2014; all rights reserved.
How To Build a Strategic Plan: A Step-by-Step Guide for School Managers.
ERIC Educational Resources Information Center
Clay, Katherine; And Others
Strategic planning techniques for administrators, with a focus on process managers, are presented in this guidebook. The three major tasks of the strategic planning process include the assessment of the current organizational situation, goal setting, and the development of strategies to accomplish this. Strategic planning differs from long-range…
12 CFR 390.104 - What information must I include in my draft business plan?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 12 Banks and Banking 5 2014-01-01 2014-01-01 false What information must I include in my draft... Application Processing Procedures § 390.104 What information must I include in my draft business plan? If you are required to submit a draft business plan under § 309.103, your plan must: (a) Clearly and...
12 CFR 390.104 - What information must I include in my draft business plan?
Code of Federal Regulations, 2013 CFR
2013-01-01
... 12 Banks and Banking 5 2013-01-01 2013-01-01 false What information must I include in my draft... Application Processing Procedures § 390.104 What information must I include in my draft business plan? If you are required to submit a draft business plan under § 309.103, your plan must: (a) Clearly and...
12 CFR 390.104 - What information must I include in my draft business plan?
Code of Federal Regulations, 2012 CFR
2012-01-01
... 12 Banks and Banking 5 2012-01-01 2012-01-01 false What information must I include in my draft... Application Processing Procedures § 390.104 What information must I include in my draft business plan? If you are required to submit a draft business plan under § 309.103, your plan must: (a) Clearly and...
NASA Astrophysics Data System (ADS)
Conway, Esther; Waterfall, Alison; Pepler, Sam; Newey, Charles
2015-04-01
In this paper we decribe a business process modelling approach to the integration of exisiting archival activities. We provide a high level overview of existing practice and discuss how procedures can be extended and supported through the description of preservation state. The aim of which is to faciliate the dynamic controlled management of scientific data through its lifecycle. The main types of archival processes considered are: • Management processes that govern the operation of an archive. These management processes include archival governance (preservation state management, selection of archival candidates and strategic management) . • Operational processes that constitute the core activities of the archive which maintain the value of research assets. These operational processes are the acquisition, ingestion, deletion, generation of metadata and preservation actvities, • Supporting processes, which include planning, risk analysis and monitoring of the community/preservation environment. We then proceed by describing the feasability testing of extended risk management and planning procedures which integrate current practices. This was done through the CEDA Archival Format Audit which inspected British Atmospherics Data Centre and National Earth Observation Data Centre Archival holdings. These holdings are extensive, comprising of around 2PB of data and 137 million individual files which were analysed and characterised in terms of format based risk. We are then able to present an overview of the risk burden faced by a large scale archive attempting to maintain the usability of heterogeneous environmental data sets. We conclude by presenting a dynamic data management information model that is capable of describing the preservation state of archival holdings throughout the data lifecycle. We provide discussion of the following core model entities and their relationships: • Aspirational entities, which include Data Entity definitions and their associated Preservation Objectives. • Risk entities, which act as drivers for change within the data lifecycle. These include Acquisitional Risks, Technical Risks, Strategic Risks and External Risks • Plan entities, which detail the actions to bring about change within an archive. These include Acquisition Plans, Preservation Plans and Monitoring plans • The Result entities describe the successful outcomes of the executed plans. These include Acquisitions, Mitigations and Accepted Risks.
Code of Federal Regulations, 2011 CFR
2011-07-01
... System Land and Resource Management Planning The Framework for Planning § 219.3 Overview. (a) The planning framework. Land and resource management planning is a flexible process for fitting solutions to... responsible for national planning. National planning includes the Forest Service national strategic plan...
Linking the Teacher Appraisal Process to the School Improvement Plan
ERIC Educational Resources Information Center
Reddekopp, Therese
2007-01-01
If a school improvement plan includes input from all stakeholders and focuses on data-driven processes that are linked to teacher appraisal, it can be powerful in leading the school toward the common mission of achieving student success. Linking the school improvement plan to the teacher appraisal process creates a system whereby all individuals…
Creating a nursing strategic planning framework based on evidence.
Shoemaker, Lorie K; Fischer, Brenda
2011-03-01
This article describes an evidence-informed strategic planning process and framework used by a Magnet-recognized public health system in California. This article includes (1) an overview of the organization and its strategic planning process, (2) the structure created within nursing for collaborative strategic planning and decision making, (3) the strategic planning framework developed based on the organization's balanced scorecard domains and the new Magnet model, and (4) the process undertaken to develop the nursing strategic priorities. Outcomes associated with the structure, process, and key initiatives are discussed throughout the article. Copyright © 2011 Elsevier Inc. All rights reserved.
ERIC Educational Resources Information Center
Kies, Cosette N.
A brief overview of the functions of public relations in libraries introduces this manual, which provides an explanation of the public relations (PR) process, including fact-finding, planning, communicating, evaluating, and marketing; some PR principles; a 10-step program that could serve as a model for planning a PR program; a discussion of PR…
Teaching Children Science. Second Edition.
ERIC Educational Resources Information Center
Abruscato, Joseph
This book focuses on science teaching at the elementary school level. It includes chapters dealing with various science content areas and teaching processes including: (1) what is science; (2) why teach science; (3) process skills as a foundation for unit and lesson planning; (4) how to plan learning units, daily lessons, and assessment…
Knight, Andrew T; Driver, Amanda; Cowling, Richard M; Maze, Kristal; Desmet, Philip G; Lombard, Amanda T; Rouget, Mathieu; Botha, Mark A; Boshoff, Andre F; Castley, J Guy; Goodman, Peter S; Mackinnon, Kathy; Pierce, Shirley M; Sims-Castley, Rebecca; Stewart, Warrick I; von Hase, Amrei
2006-06-01
Systematic conservation assessment and conservation planning are two distinct fields of conservation science often confused as one and the same. Systematic conservation assessment is the technical, often computer-based, identification of priority areas for conservation. Conservation planning is composed of a systematic conservation assessment coupled with processes for development of an implementation strategy and stakeholder collaboration. The peer-reviewed conservation biology literature abounds with studies analyzing the performance of assessments (e.g., area-selection techniques). This information alone, however can never deliver effective conservation action; it informs conservation planning. Examples of how to translate systematic assessment outputs into knowledge and then use them for "doing" conservation are rare. South Africa has received generous international and domestic funding for regional conservation planning since the mid-1990s. We reviewed eight South African conservation planning processes and identified key ingredients of best practice for undertaking systematic conservation assessments in a way that facilitates implementing conservation action. These key ingredients include the design of conservation planning processes, skills for conservation assessment teams, collaboration with stakeholders, and interpretation and mainstreaming of products (e.g., maps) for stakeholders. Social learning institutions are critical to the successful operationalization of assessments within broader conservation planning processes and should include not only conservation planners but also diverse interest groups, including rural landowners, politicians, and government employees.
Marine spatial planning in practice
NASA Astrophysics Data System (ADS)
Collie, Jeremy S.; (Vic) Adamowicz, W. L.; Beck, Michael W.; Craig, Bethany; Essington, Timothy E.; Fluharty, David; Rice, Jake; Sanchirico, James N.
2013-01-01
Multiple competing uses of continental-shelf environments have led to a proliferation of marine spatial planning initiatives, together with expert guidance on marine spatial planning. This study provides an empirical review of marine spatial plans, their attributes, and the extent to which the expert guidance is actually being followed. We performed a structured review of 16 existing marine spatial plans and created an idealized marine spatial plan from the steps included in recent expert papers. A cluster analysis of the yes/no answers to 28 questions was used to ordinate the 16 marine spatial plans and to compare them with the idealized plan. All the plans that have been implemented have a high-level government mandate and the authority to implement spatial planning vested in existing institutions. Almost all the plans used data with clear criteria for data inclusion. Stakeholders were included in almost all the plans; they did not participate in all stages of the planning process but their roles were generally clearly defined. Decision-support tools were applied inconsistently across plans and were seldom used dynamically over time. Most spatial planning processes did not select specific outcomes, such as preferred use scenarios. Success is defined inconsistently across plans; in half the cases there are no metrics of success with reference benchmarks. Although monitoring is included in the majority of plans, only in some cases do monitoring results feed back into management decisions. The process of marine spatial planning had advanced in that some of the more recent plans were developed more quickly and contain more desirable attributes than earlier plans. Even so, existing marine spatial plans are heterogeneous—there are essential ingredients, but no single recipe for success.
On Intelligent Design and Planning Method of Process Route Based on Gun Breech Machining Process
NASA Astrophysics Data System (ADS)
Hongzhi, Zhao; Jian, Zhang
2018-03-01
The paper states an approach of intelligent design and planning of process route based on gun breech machining process, against several problems, such as complex machining process of gun breech, tedious route design and long period of its traditional unmanageable process route. Based on gun breech machining process, intelligent design and planning system of process route are developed by virtue of DEST and VC++. The system includes two functional modules--process route intelligent design and its planning. The process route intelligent design module, through the analysis of gun breech machining process, summarizes breech process knowledge so as to complete the design of knowledge base and inference engine. And then gun breech process route intelligently output. On the basis of intelligent route design module, the final process route is made, edited and managed in the process route planning module.
Ohio Board of Regents Guidelines for Preparing FY 2009-FY 2014 Capital Plans
ERIC Educational Resources Information Center
Ohio Board of Regents, 2007
2007-01-01
As with past practice, publishing this set of guidelines officially launches the higher education capital planning and budgeting process for fiscal years 2009-2014. The guidelines include a schedule, definitions, planning assumptions, statewide considerations, and instructions for presenting a six year capital plan. Contents include: (1)…
Ohio Board of Regents Guidelines for Preparing FY 2007-FY 2012 Capital Plans
ERIC Educational Resources Information Center
Ohio Board of Regents, 2005
2005-01-01
As with past practice, publishing this set of guidelines officially launches the higher education capital planning and budgeting process for fiscal years 2007-2012. The guidelines include a schedule, definitions, planning assumptions, statewide considerations, and instructions for presenting a six-year capital plan. Contents include: (1)…
Code of Federal Regulations, 2014 CFR
2014-10-01
... Department of Health and Human Services GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...
Code of Federal Regulations, 2012 CFR
2012-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...
Code of Federal Regulations, 2011 CFR
2011-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...
Code of Federal Regulations, 2013 CFR
2013-10-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17... Federal, State, and local child care and early childhood development programs, including such programs for...
Health sector operational planning and budgeting processes in Kenya—“never the twain shall meet”
Molyneux, Sassy; Goodman, Catherine
2015-01-01
Summary Operational planning is considered an important tool for translating government policies and strategic objectives into day‐to‐day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top‐down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local‐level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. PMID:25783862
Alghzawi, Hamzah M.
2012-01-01
Background. Integration of research evidence into clinical nursing practice is essential for the delivery of high-quality nursing care. Discharge planning is an essential process in psychiatric nursing field, in order to prevent recurrent readmission to psychiatric units. Objective. The purpose of this paper is to perform literature overview on psychiatric discharge planning, in order to develop evidence-based practice guideline of psychiatric discharge plan. Methods. A search of electronic databases was conducted. The search process aimed to locate different levels of evidence. Inclusion criteria were studies including outcomes related to prevention of readmission as stability in the community, studies investigating the discharge planning process in acute psychiatric wards, and studies that included factors that impede discharge planning and factors that aid timely discharge. On the other hand, exclusion criteria were studies in which discharge planning was discussed as part of a multi faceted intervention and was not the main focus of the review. Result. Studies met inclusion criteria were mainly literature reviews, consensus statements, and descriptive studies. All of these studies are considered at the lower levels of evidence. Conclusion. This review demonstrated that discharge planning based on general principles (evidence based principles) should be applied during psychiatric discharge planning to make this discharge more effective. Depending on this review, it could be concluded that effective discharge planning includes main three stages; initial discharge meeting, regular discharge meeting(s), and leaving from hospital and discharge day. Each stage of them has requirements should be accomplished be go to the next stage. PMID:23762767
Planning for Success: Integrating Analysis with Decision Making.
ERIC Educational Resources Information Center
Goho, James; Webb, Ken
2003-01-01
Describes a successful strategic planning process at a large community college, which linked the analytic inputs of research with the authority and intuition of leaders. Reports key factors attributed to the process' success, including a collegial and organized structure, detailed project management plans, and confidence in the environmental scan.…
Strategic planning: the first step in the planning process.
Gelinas, Marc A
2003-01-01
Strategic planning is a systematic process through which an organization builds commitment among key stakeholders to goals and priorities which are essential to its mission and vision, and responsive to the operating environment. Strategic planning is the first step in a comprehensive planning process that also includes business planning and implementation planning. If all three steps are carried out in sequence, strategic planning can be a very effective means of educating the stakeholders about where the cancer program is and where it is going, gaining support and commitment for the direction that the cancer program will take, and assuring that everyone's expectations can be managed effectively. Unfortunately, some organizations and cancer program leaders misunderstand the process. Too often, strategic planning is used as a stand-alone activity. This article will describe what strategic planning is, how it should smoothly lead into business planning and implementation planning, and how to avoid the pitfalls that sometimes arise during the strategic planning effort.
Health sector operational planning and budgeting processes in Kenya-"never the twain shall meet".
Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine
2016-07-01
Operational planning is considered an important tool for translating government policies and strategic objectives into day-to-day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top-down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local-level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.
Limits of acceptable change planning in the Selway-Bitterroot Wilderness: 1985 to 1997 (FIDL)
Dan Ritter
1997-01-01
In 1985 the Forest Supervisors and staff of the Bitterroot, Clearwater, and Nez Perce National Forests met and agreed to an action plan for implementing a Limits of Acceptable Change (LAC) planning process for the Selway-Bitterroot Wilderness (SBW). The process, which was to include a citizens task force, was to produce a completed management plan in 2 years. Eight...
NASA Technical Reports Server (NTRS)
Waid, Michael
2011-01-01
Manufacturing process, milestones and inputs are unknowns to first-time users of the manufacturing facilities. The Manufacturing Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their project engineering personnel in manufacturing planning and execution. Material covered includes a roadmap of the manufacturing process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Towards automatic planning for manufacturing generative processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
CALTON,TERRI L.
2000-05-24
Generative process planning describes methods process engineers use to modify manufacturing/process plans after designs are complete. A completed design may be the result from the introduction of a new product based on an old design, an assembly upgrade, or modified product designs used for a family of similar products. An engineer designs an assembly and then creates plans capturing manufacturing processes, including assembly sequences, component joining methods, part costs, labor costs, etc. When new products originate as a result of an upgrade, component geometry may change, and/or additional components and subassemblies may be added to or are omitted from themore » original design. As a result process engineers are forced to create new plans. This is further complicated by the fact that the process engineer is forced to manually generate these plans for each product upgrade. To generate new assembly plans for product upgrades, engineers must manually re-specify the manufacturing plan selection criteria and re-run the planners. To remedy this problem, special-purpose assembly planning algorithms have been developed to automatically recognize design modifications and automatically apply previously defined manufacturing plan selection criteria and constraints.« less
A College Planning Cycle. People Resources Process. A Practical Guide.
ERIC Educational Resources Information Center
National Association of College and University Business Officers, Washington, DC.
The process described in this manual is one of the few systems for planning and budgeting in colleges and universities that is meticulously detailed. It includes the unique concepts of the planning team and the analytical studies team, and promotes a cooperative, integrated, and enthusiastic involvement of faculty, students, and staff from all…
Best practices in developing regional transportation plans
DOT National Transportation Integrated Search
2001-08-01
The purpose of this study is to compare Metropolitan Planning Organization (MPO) Regional Transportation Plans (RTP) and planning processes in California with selected regions. A total of 17 MPOs were included to provide a balance of geographic locat...
The State of Strategic Planning: A Survey of Selected Research Universities.
ERIC Educational Resources Information Center
Tan, David L.
1995-01-01
Despite the complexity and elusiveness of strategic planning by research universities, factors correlated with satisfaction in planning include presence of president or chief executive, presence of centralization and decentralization elements in the planning process, presence of a permanent planning committee, linkage of planning to budgeting, use…
A Framework for Corporate Strategic Planning: Philosophy, Process, and Practice. Paper P-97.
ERIC Educational Resources Information Center
Amara, Roy
The objective of this booklet is to present an integrated picture of the philosophy, process, and practices of strategic planning in an organizational context. It is based on the premise that planning includes the design of a desired future as well as effective ways of bringing it about. Specifically, the document illustrates a planning…
Planning for the Aging: A Manual of Practical Methods.
ERIC Educational Resources Information Center
Cotton, Frank E., Jr.
This manual is divided into three major parts. Part One explores the role and process of planning delivery services to the aging, including leadership. Part Two offers several methods for carrying out each of seven steps delineated in the planning process, and describes their application to the delivery of services for the aging. Part Three…
18 CFR 5.11 - Potential Applicant's proposed study plan and study plan meetings.
Code of Federal Regulations, 2010 CFR
2010-04-01
... proposed study plan and study plan meetings. 5.11 Section 5.11 Conservation of Power and Water Resources... INTEGRATED LICENSE APPLICATION PROCESS § 5.11 Potential Applicant's proposed study plan and study plan..., including information and study requests, the potential applicant must file with the Commission a proposed...
18 CFR 5.11 - Potential Applicant's proposed study plan and study plan meetings.
Code of Federal Regulations, 2011 CFR
2011-04-01
... proposed study plan and study plan meetings. 5.11 Section 5.11 Conservation of Power and Water Resources... INTEGRATED LICENSE APPLICATION PROCESS § 5.11 Potential Applicant's proposed study plan and study plan..., including information and study requests, the potential applicant must file with the Commission a proposed...
Antenna Test Facility (ATF): User Test Planning Guide
NASA Technical Reports Server (NTRS)
Lin, Greg
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Chamber B Thermal/Vacuum Chamber: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Montz, Mike E.
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of Chamber B. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Audio Development Laboratory (ADL) User Test Planning Guide
NASA Technical Reports Server (NTRS)
Romero, Andy
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the ADL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Radiant Heat Test Facility (RHTF): User Test Planning Guide
NASA Technical Reports Server (NTRS)
DelPapa, Steven
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the RHTF. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Electronic Systems Test Laboratory (ESTL) User Test Planning Guide
NASA Technical Reports Server (NTRS)
Robinson, Neil
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the ESTL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Communication Systems Simulation Laboratory (CSSL): Simulation Planning Guide
NASA Technical Reports Server (NTRS)
Schlesinger, Adam
2012-01-01
The simulation process, milestones and inputs are unknowns to first-time users of the CSSL. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.
Advanced Materials Laboratory User Test Planning Guide
NASA Technical Reports Server (NTRS)
Orndoff, Evelyne
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the Advanced Materials Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Structures Test Laboratory (STL). User Test Planning Guide
NASA Technical Reports Server (NTRS)
Zipay, John J.
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the STL. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Systems Engineering Simulator (SES) Simulator Planning Guide
NASA Technical Reports Server (NTRS)
McFarlane, Michael
2011-01-01
The simulation process, milestones and inputs are unknowns to first-time users of the SES. The Simulator Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.
Computational Electromagnetics (CEM) Laboratory: Simulation Planning Guide
NASA Technical Reports Server (NTRS)
Khayat, Michael A.
2011-01-01
The simulation process, milestones and inputs are unknowns to first-time users of the CEM Laboratory. The Simulation Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.
Person-Centered Transition Planning.
ERIC Educational Resources Information Center
Miner, Craig A.; Bates, Paul E.
1997-01-01
Describes a person-centered planning approach for involving students with disabilities and their families in the transition planning process. Components of person-centered planning are discussed, including development of a personal profile, identification of future lifestyle preferences, action steps and responsible parties, and necessary changes…
The Architectural and Interior Design Planning Process.
ERIC Educational Resources Information Center
Cohen, Elaine
1994-01-01
Explains the planning process in designing effective library facilities and discusses library building requirements that result from electronic information technologies. Highlights include historical structures; Americans with Disabilities Act; resource allocation; electrical power; interior spaces; lighting; design development; the roles of…
Decision support systems and the healthcare strategic planning process: a case study.
Lundquist, D L; Norris, R M
1991-01-01
The repertoire of applications that comprises health-care decision support systems (DSS) includes analyses of clinical, financial, and operational activities. As a whole, these applications facilitate developing comprehensive and interrelated business and medical models that support the complex decisions required to successfully manage today's health-care organizations. Kennestone Regional Health Care System's use of DSS to facilitate strategic planning has precipitated marked changes in the organization's method of determining capital allocations. This case study discusses Kennestone's use of DSS in the strategic planning process, including profiles of key DSS modeling components.
Lapping, Karin; Frongillo, Edward A; Nguyen, Phuong H; Coates, Jennifer; Webb, Patrick; Menon, Purnima
2014-09-01
Translating national policies and guidelines into effective action at the subnational level (e.g., province or region) is a prerequisite for ensuring an impact on nutrition. In several countries, including Vietnam, the focus of this paper, this process is affected by the quality of the decentralized process of planning and action. This study examined how provincial planning processes for nutrition occurred in Vietnam during 2009 and 2010. Key goals were to understand variability in processes across provinces, identify factors that influenced the process, and assess the usefulness of the process for individuals involved in planning and action. A qualitative case-study methodology was used. Data were drawn from interviews with 51 government officials in eight provinces. The study found little variability in the planning process among these eight provinces, probably due to a planning process that was predominantly a fiscal exercise within the confines of a largely centralized structure. Respondents were almost unanimous about the main barriers: a top-down approach to planning, limited human capacity for effective planning at subnational levels, and difficulty in integrating actions from multiple sectors. Provincial-level actors were deeply dissatisfied with the nature of their role in the process. Despite the rhetoric to the contrary, too much power is probably still retained at the central level. A strategic multiyear approach is needed to strengthen the provincial planning process and address many of the key barriers identified in this study.
The Circle of Courage[TM] in Transition Planning
ERIC Educational Resources Information Center
Espiner, Deborah; Guild, Diane
2011-01-01
Young people with learning and behaviour disabilities often leave school without transition planning. When planning does occur, there is generally a discrepancy between the goals of students, parents, and professionals. Students requiring higher levels of support may not even be included in the planning process and transition plans are often…
MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feng, W.
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less
MO-B-BRB-00: Optimizing the Treatment Planning Process
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kapur, A.
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less
Kearns, Randy D; Cairns, Bruce A; Hickerson, William L; Holmes, James H
2014-01-01
The Southern Region of the American Burn Association began to craft a regional plan to address a surge of burn-injured patients after a mass casualty event in 2004. Published in 2006, this plan has been tested through modeling, exercise, and actual events. This article focuses on the process of how the plan was created, how it was tested, and how it interfaces with other ongoing efforts on preparedness. One key to success regarding how people respond to a disaster can be traced to preexisting relationships and collaborations. These activities would include training or working together and building trust long before the crisis. Knowing who you can call and rely on when you need help, within the context of your plan, can be pivotal in successfully managing a disaster. This article describes how a coalition of burn center leaders came together. Their ongoing personal association has facilitated the development of planning activities and has kept the process dynamic. This article also includes several of the building blocks for developing a plan from creation to composition, implementation, and testing. The plan discussed here is an example of linking leadership, relationships, process, and documentation together. On the basis of these experiences, the authors believe these elements are present in other regions. The intent of this work is to share an experience and to offer it as a guide to aid others in their regional burn disaster planning efforts.
Collaboration process for integrated social and health care strategy implementation.
Korpela, Jukka; Elfvengren, Kalle; Kaarna, Tanja; Tepponen, Merja; Tuominen, Markku
2012-01-01
To present a collaboration process for creating a roadmap for the implementation of a strategy for integrated health and social care. The developed collaboration process includes multiple phases and uses electronic group decision support system technology (GDSS). A case study done in the South Karelia District of Social and Health Services in Finland during 2010-2011. An expert panel of 13 participants was used in the planning process of the strategy implementation. The participants were interviewed and observed during the case study. As a practical result, a roadmap for integrated health and social care strategy implementation has been developed. The strategic roadmap includes detailed plans of several projects which are needed for successful integration strategy implementation. As an academic result, a collaboration process to create such a roadmap has been developed. The collaboration process and technology seem to suit the planning process well. The participants of the meetings were satisfied with the collaboration process and the GDSS technology. The strategic roadmap was accepted by the participants, which indicates satisfaction with the developed process.
ERIC Educational Resources Information Center
Popovics, Alexander J.; Jonas, Peter M.
This paper describes the use of a comprehensive participative planning model for colleges and universities that includes processes of environmental scanning, proposed by J. Morrison and others, and key elements of the Objective-Based Assessment, Planning, and Resource Allocation System (OAPRAS) proposed by M. Capoor. The process is explained…
Mission Operations of the Mars Exploration Rovers
NASA Technical Reports Server (NTRS)
Bass, Deborah; Lauback, Sharon; Mishkin, Andrew; Limonadi, Daniel
2007-01-01
A document describes a system of processes involved in planning, commanding, and monitoring operations of the rovers Spirit and Opportunity of the Mars Exploration Rover mission. The system is designed to minimize command turnaround time, given that inherent uncertainties in terrain conditions and in successful completion of planned landed spacecraft motions preclude planning of some spacecraft activities until the results of prior activities are known by the ground-based operations team. The processes are partitioned into those (designated as tactical) that must be tied to the Martian clock and those (designated strategic) that can, without loss, be completed in a more leisurely fashion. The tactical processes include assessment of downlinked data, refinement and validation of activity plans, sequencing of commands, and integration and validation of sequences. Strategic processes include communications planning and generation of long-term activity plans. The primary benefit of this partition is to enable the tactical portion of the team to focus solely on tasks that contribute directly to meeting the deadlines for commanding the rover s each sol (1 sol = 1 Martian day) - achieving a turnaround time of 18 hours or less, while facilitating strategic team interactions with other organizations that do not work on a Mars time schedule.
Strategic survey framework for the Northwest Forest Plan survey and manage program.
Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler
2003-01-01
This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...
Planning that works: Empowerment through stakeholder focused interactive planning (SFIP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beck, J.E.; Ison, S.A.
1994-12-31
This paper describes a powerful planning tool that can enable government, private industries, and public interest organizations to actualize their visions through sound decision making. The stakeholder focused interactive planning model is designed to integrate and ultimately gain stakeholder investment in the success of attainment of their vision. The only concessions required of the planning organization using this process is the acceptance of the premise that sustained vision success requires the support of both internal and external stakeholders and that each step in the process must be used as a validation of the previous step and essential to the completionmore » of the next step. What is stakeholder/public involvement? It is the process in which the stakeholders (both internal and external) values, interests and expectations are included in decision-making processes. The primary goal of public involvement efforts is to include all those who have a stake in the decision, whether or not they have already been identified. Stakeholders are individuals, contractors, clients, suppliers, public organizations, state and local governments, Indian tribes, federal agencies, and other parties affected by decisions.« less
MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chang, J.
The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less
Frey, Keith; Cranmer, John Jack; Kirby, Lani J; Lenko, Paul H; Vrabel, Amy Z
2005-01-01
This article describes the Mayo Arizona process for developing an information technology strategic plan. The background of organizational events that gave rise to this strategic planning process is presented. A cross-functional team of key IT stakeholders was convened; the team used a facilitated process to derive a pro forma set of IT strategic objectives from the larger organization's emerging strategic plan. A broad set of leadership interviews was conducted to further identify detailed objectives that would confirm, complement, or conflict with the "strawperson." The IT strategic objectives then were refined and published by the organization. The article also describes the annual process of reviewing the IT strategic plan and translating it to a set of tactical objectives. This includes the committee structure for project prioritization, which is guided by the IT strategic plan. The outcome of the prioritization process is a five-year IT tactical plan, which is used to communicate the IT action plan for achievement of the strategic objectives. The strategic and tactical plans have resulted in stronger ownership and advocacy of IT activities by organizational leadership and a clearer view of the impact of technology on the organization's strategic plan.
Managing the construction bidding process : a move to simpler construction plan sets
DOT National Transportation Integrated Search
2001-01-31
This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...
DOT National Transportation Integrated Search
2010-03-01
Transportation corridor-planning processes are well understood, and consensus exists among practitioners : about common practices for stages and tasks included in traditional EIS approaches. However, traditional approaches do : not typically employ f...
Bower, Peter; Roberts, Chris; O'Leary, Neil; Callaghan, Patrick; Bee, Penny; Fraser, Claire; Gibbons, Chris; Olleveant, Nicola; Rogers, Anne; Davies, Linda; Drake, Richard; Sanders, Caroline; Meade, Oonagh; Grundy, Andrew; Walker, Lauren; Cree, Lindsey; Berzins, Kathryn; Brooks, Helen; Beatty, Susan; Cahoon, Patrick; Rolfe, Anita; Lovell, Karina
2015-08-13
Involving service users in planning their care is at the centre of policy initiatives to improve mental health care quality in England. Whilst users value care planning and want to be more involved in their own care, there is substantial empirical evidence that the majority of users are not fully involved in the care planning process. Our aim is to evaluate the effectiveness and cost-effectiveness of training for mental health professionals in improving user involvement with the care planning processes. This is a cluster randomised controlled trial of community mental health teams in NHS Trusts in England allocated either to a training intervention to improve user and carer involvement in care planning or control (no training and care planning as usual). We will evaluate the effectiveness of the training intervention using a mixed design, including a 'cluster cohort' sample, a 'cluster cross-sectional' sample and process evaluation. Service users will be recruited from the caseloads of care co-ordinators. The primary outcome will be change in self-reported involvement in care planning as measured by the validated Health Care Climate Questionnaire. Secondary outcomes include involvement in care planning, satisfaction with services, medication side-effects, recovery and hope, mental health symptoms, alliance/engagement, well-being and quality of life. Cost- effectiveness will also be measured. A process evaluation informed by implementation theory will be undertaken to assess the extent to which the training was implemented and to gauge sustainability beyond the time-frame of the trial. It is hoped that the trial will generate data to inform mental health care policy and practice on care planning. ISRCTN16488358 (14 May 2014).
Vibration and Acoustic Test Facility (VATF): User Test Planning Guide
NASA Technical Reports Server (NTRS)
Fantasia, Peter M.
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide
NASA Technical Reports Server (NTRS)
Stokes, LeBarian
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Materials and Nondestructive Evaluation Laboratoriers: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Schaschl, Leslie
2011-01-01
The Materials and Nondestructive Evaluation Laboratory process, milestones and inputs are unknowns to first-time users. The Materials and Nondestructive Evaluation Laboratory Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware developers. It is intended to assist their project engineering personnel in materials analysis planning and execution. Material covered includes a roadmap of the analysis process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define scope of analysis, cost, and schedule are included as an appendix to the guide.
Specialized Environmental Chamber Test Complex: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Montz, Michael E.
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the Specialized Environmental Test Complex. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide
NASA Technical Reports Server (NTRS)
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide
NASA Technical Reports Server (NTRS)
Salinas, Michael
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
NASA Technical Reports Server (NTRS)
Scully, Robert C.
2011-01-01
Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
Planning Systems for Distributed Operations
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.
Toward a space materials systems program
NASA Technical Reports Server (NTRS)
Vontiesenhausen, G. F.
1981-01-01
A program implementation model is presented which covers the early stages of space material processing and manufacturing. The model includes descriptions of major program elements, development and experiment requirements in space materials processing and manufacturing, and an integration of the model into NASA's long range plans as well as its evolution from present Materials Processing in Space plans.
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2013 CFR
2013-10-01
... Processing and Information Retrieval System Guide. The initial advance automatic data processing planning... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
Resource Allocation Planning Helper (RALPH): Lessons learned
NASA Technical Reports Server (NTRS)
Durham, Ralph; Reilly, Norman B.; Springer, Joe B.
1990-01-01
The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.
Strategic planning in healthcare organizations.
Rodríguez Perera, Francisco de Paula; Peiró, Manel
2012-08-01
Strategic planning is a completely valid and useful tool for guiding all types of organizations, including healthcare organizations. The organizational level at which the strategic planning process is relevant depends on the unit's size, its complexity, and the differentiation of the service provided. A cardiology department, a hemodynamic unit, or an electrophysiology unit can be an appropriate level, as long as their plans align with other plans at higher levels. The leader of each unit is the person responsible for promoting the planning process, a core and essential part of his or her role. The process of strategic planning is programmable, systematic, rational, and holistic and integrates the short, medium, and long term, allowing the healthcare organization to focus on relevant and lasting transformations for the future. Copyright © 2012 Sociedad Española de Cardiología. Published by Elsevier Espana. All rights reserved.
Louisiana's 2017 Master Plan for a Sustainable Coast
NASA Astrophysics Data System (ADS)
Haase, B.
2017-12-01
The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement
Benefits to blood banks of a sales and operations planning process.
Keal, Donald A; Hebert, Phil
2010-12-01
A formal sales and operations planning (S&OP) process is a decision making and communication process that balances supply and demand while integrating all business operational components with customer-focused business plans that links high level strategic plans to day-to-day operations. Furthermore, S&OP can assist in managing change across the organization as it provides the opportunity to be proactive in the face of problems and opportunities while establishing a plan for everyone to follow. Some of the key outcomes from a robust S&OP process in blood banking would include: higher customer satisfaction (donors and health care providers), balanced inventory across product lines and customers, more stable production rates and higher productivity, more cooperation across the entire operation, and timely updates to the business plan resulting in better forecasting and fewer surprises that negatively impact the bottom line. © 2010 American Association of Blood Banks.
CPAS Preflight Drop Test Analysis Process
NASA Technical Reports Server (NTRS)
Englert, Megan E.; Bledsoe, Kristin J.; Romero, Leah M.
2015-01-01
Throughout the Capsule Parachute Assembly System (CPAS) drop test program, the CPAS Analysis Team has developed a simulation and analysis process to support drop test planning and execution. This process includes multiple phases focused on developing test simulations and communicating results to all groups involved in the drop test. CPAS Engineering Development Unit (EDU) series drop test planning begins with the development of a basic operational concept for each test. Trajectory simulation tools include the Flight Analysis and Simulation Tool (FAST) for single bodies, and the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulation for the mated vehicle. Results are communicated to the team at the Test Configuration Review (TCR) and Test Readiness Review (TRR), as well as at Analysis Integrated Product Team (IPT) meetings in earlier and intermediate phases of the pre-test planning. The ability to plan and communicate efficiently with rapidly changing objectives and tight schedule constraints is a necessity for safe and successful drop tests.
18 CFR 5.12 - Comments on proposed study plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... study plan. 5.12 Section 5.12 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... PROCESS § 5.12 Comments on proposed study plan. Comments on the potential applicant's proposed study plan, including any revised information or study requests, must be filed within 90 days after the proposed study...
New Jersey State Library Technology Plan, 1999-2001.
ERIC Educational Resources Information Center
Breedlove, Elizabeth A., Ed.
This document represents the New Jersey State Library Technology Plan for 1999-2001. Contents include: the mission statement; technology planning process of the Technology Committee (convened by the State Library); specific goals of the Technology Plan 1999-2001; technology assumptions for the operational library and statewide library services;…
Galileo mission planning for Low Gain Antenna based operations
NASA Technical Reports Server (NTRS)
Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.
1994-01-01
The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.
Galileo mission planning for Low Gain Antenna based operations
NASA Astrophysics Data System (ADS)
Gershman, R.; Buxbaum, K. L.; Ludwinski, J. M.; Paczkowski, B. G.
1994-11-01
The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.
Developing an information systems strategy for nursing.
Callanan, K M; Hughes, S J
1995-01-01
With the rapidly changing health care environment and information technology advances, organizations need to engage in strategic, planned change in order to allocate limited resources, achieve the organization's goals, and fulfill its mission [1]. One of the most important aspects of the organization's planned strategies for change concerns the information systems. The involvement of the nursing department in this process is critical. This poster presentation will communicate how nurses can develop an information systems strategic plan that will enable them to play an active role as contributors and vital participants in the strategic and business planning processes for information systems. This information systems strategy for nursing will: a) provide direction and purpose, b) guide nursing in identifying the kinds of information technology needed, c) assist in timely implementation of a system that supports nursing, and d) identify desired outcomes and benefits of an information system. The nursing information systems plan must be built on, and support, the organization's mission and business plan and integrate into the over-all information systems plans [2]. Components of the nursing strategic plan include the nursing mission statement and vision, an assessment of the current environment to identify supporting technology needed to achieve the nursing vision, expectations/anticipated outcomes, environmental considerations, and special staffing/expertise considerations. The nursing vision and mission statement is an articulation of the overall direction and purpose of the nursing organization. An assessment of the nursing organization, problem areas, opportunities for growth, the physical environment, existing systems, communications requirements, and resources is carried out to help identify areas where new technologies and automated methods of managing information could be applied. Special staffing and expertise not currently available in the organization, but necessary to the successful implementation of the plan, should be identified, and plans for filling those needs should be included in the planning and prioritization process. Based on the mission and assessment findings, goals or anticipated outcomes are developed. These goals must be realistic, financially feasible, and logistically achievable; they should also provide direction for action and decision-making [3]. Measurable objectives and detailed action plans can then be developed from these goals when implementation of this aspect of the strategic plan is begun. It is especially important, even at a strategic planning level, to consider change management techniques, including specific steps to involve individuals who will be affected by the change and to ensure open communication throughout the process. Efforts to collaborate with all affected departments and to offer input and educational opportunities to the various members of the health care team should be included in the strategic plan. A business plan describing the mission, goals, and objectives for a specific system implementation is the final step in the strategic planning process. The business plan includes expected outcomes and cost justification and may be done in cooperation with other departments (in the organization) that will be involved with this system. The business plan is used to communicate the information system's needs to the administration and governing board of the organization. With a good information systems strategy, nursing will be prepared to make more timely and better informed decisions related to applying information technology within the nursing department. The end results of this planning should be evident in the improved utilization of information technology to support the nursing vision and mission.
ITS/CVO strategic & business plan for the state of Georgia
DOT National Transportation Integrated Search
1998-05-01
This document records the State of Georgias strategic and tactical plans for employing ITS/CVO technology to improve its Commercial Vehicle Administration (CVA) functions. The process by which this plan was developed included a detailed assessment...
ERIC Educational Resources Information Center
Patchner, Michael A.; Balgopal, Pallassana R.
Three studies were undertaken to examine topics of care planning, personnel management, and quality assurance in long-term care facilities. The first study examined the formulation and implementation processes of care planning for nursing home residents. The exemplary homes' care planning included the existence of strong care planning leadership,…
How Strategic Planning Keeps You Sane when Delivering Distance Programs
ERIC Educational Resources Information Center
MacNeil, Dixie; Luzius, Kim; Dunkin, Sonya
2010-01-01
This paper details the advantages of creating a strategic plan in the development and delivery of distance programs at the authors' own institution. The steps involved in the planning process and the three key elements of a successful strategic plan are addressed. The key elements include a program plan explaining the roles/responsibilities of…
The expected results include an integrated process and mechanical design including a fabrication plan for the glycerol dehydration reactor, comprehensive heat and material balance, environmental impact assessment and comprehensive safety review. The resulting process design w...
Bidding-based autonomous process planning and scheduling
NASA Astrophysics Data System (ADS)
Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.
1995-08-01
Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.
Multimodal system planning technique : an analytical approach to peak period operation
DOT National Transportation Integrated Search
1995-11-01
The multimodal system planning technique described in this report is an improvement of the methodology used in the Dallas System Planning Study. The technique includes a spreadsheet-based process to identify the costs of congestion, construction, and...
PRE-QUALITY ASSURANCE PROJECT PLAN (QAPP) AGREEMENT (PQA) (HANDOUT)
The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...
Designing-and Redesigning-Information Services for Maximum Impact.
ERIC Educational Resources Information Center
Jones, Rebecca; Dysart, Jane
2002-01-01
Discusses innovative information services, including new services and the redesign of existing services. Describes the development process, including assessing the market and developing a marketing plan; and explains the implementation process, including monitoring client satisfaction and quality control. (LRW)
Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide
NASA Technical Reports Server (NTRS)
Salinas, Michael J.
2012-01-01
Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.
ERIC Educational Resources Information Center
Lobo, Rosale Constance
2017-01-01
Registered Nurses use clinical documentation to describe care planning processes, measure quality outcomes, support reimbursement, and defend litigation. The Connecticut Department of Health, guided by federal Conditions of Participation, defines state-level healthcare policy to include required care planning processes. Nurses are educated in care…
Marketing: Realistic Tips for Planning and Implementation in Special Libraries.
ERIC Educational Resources Information Center
Kassel, Amelia
2002-01-01
Discusses the need for special libraries to have a marketing plan in order to increase support and plan for the future. Topics include finding the time; budgets and marketing; promoting library services; the use of outside consultants; making market planning a continuous process; and marketing efforts at product shows. (LRW)
Disaster Preparedness Manual and Workbook for Pennsylvania Libraries and Archives.
ERIC Educational Resources Information Center
Swan, Elizabeth, Ed.; And Others
This document suggests components for a sound disaster plan for libraries and archives. The planning process includes four steps which are covered in this manual: educating the staff about disaster preparedness literature; planning to prevent disasters; preparing to respond to an emergency and minimize its effects; and planning how to restore…
Quality assurance of intensity-modulated radiation therapy.
Palta, Jatinder R; Liu, Chihray; Li, Jonathan G
2008-01-01
The current paradigm for the quality assurance (QA) program for intensity-modulated radiation therapy (IMRT) includes QA of the treatment planning system, QA of the delivery system, and patient-specific QA. Although the IMRT treatment planning and delivery system is the same as for conventional three-dimensional conformal radiation therapy, it has more parameters to coordinate and verify. Because of complex beam intensity modulation, each IMRT field often includes many small irregular off-axis fields, resulting in isodose distributions for each IMRT plan that are more conformal than those from conventional treatment plans. Therefore, these features impose a new and more stringent set of QA requirements for IMRT planning and delivery. The generic test procedures to validate dose calculation and delivery accuracy for both treatment planning and IMRT delivery have to be customized for each type of IMRT planning and delivery strategy. The rationale for such an approach is that the overall accuracy of IMRT delivery is incumbent on the piecewise uncertainties in both the planning and delivery processes. The end user must have well-defined evaluation criteria for each element of the planning and delivery process. Such information can potentially be used to determine a priori the accuracy of IMRT planning and delivery.
Strategic Planning and the Future of Community Colleges.
ERIC Educational Resources Information Center
Myran, Gunder A., Ed.; Kelley, Douglas, Ed.
Designed for institutional leaders facing fundamental questions of changes in mission, goals, external relations, and internal priorities, this collection offers an introduction to strategic planning and descriptions of planning processes at several community colleges. Section I includes the following essays: "What Is Strategic…
Development and implementation of an interdisciplinary plan of care.
Lewis, Cynthia; Hoffmann, Mary Lou; Gard, Angela; Coons, Jacqueline; Bichinich, Pat; Euclid, Jeff
2005-01-01
In January 2002 Aurora Health Care Metro Region chartered an interdisciplinary team to develop a process and structure for patient-centered interdisciplinary care planning. This unique endeavor created a process that includes the patient, family, and all clinical disciplines involved in planning and providing care to patients from system point of entry throughout the entire acute care episode. The interdisciplinary plan of care (IPOC) demonstrates the integration of prioritized problems, outcomes, and measurement toward goal attainment. This article focuses on the journey of this team to the successful implementation of an IPOC.
ERIC Educational Resources Information Center
Bhola, H. S.
Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…
Automated Procurement System (APS): Project management plan (DS-03), version 1.2
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1994-01-01
The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...
24 CFR 570.485 - Making of grants.
Code of Federal Regulations, 2014 CFR
2014-04-01
... future performance. If the Secretary makes any such determination, however, the State may be required to...) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN... includes requirements for the content of the consolidated plan, for the process of developing the plan...
24 CFR 570.485 - Making of grants.
Code of Federal Regulations, 2010 CFR
2010-04-01
... future performance. If the Secretary makes any such determination, however, the State may be required to...) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN... includes requirements for the content of the consolidated plan, for the process of developing the plan...
24 CFR 570.485 - Making of grants.
Code of Federal Regulations, 2012 CFR
2012-04-01
... future performance. If the Secretary makes any such determination, however, the State may be required to...) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN... includes requirements for the content of the consolidated plan, for the process of developing the plan...
Environmental Health Planning Guide. Revised 1968.
ERIC Educational Resources Information Center
Public Health Service (DHEW), Rockville, MD.
This guide to environmental health planning outlines the process and procedures of bringing together certain fundamental data pertaining to various physical aspects of the environment, including data collection, evaluation, usage, and implementation. The components of such planning programs are listed along with study preparation information.…
Leisure Resources. Its Comprehensive Planning.
ERIC Educational Resources Information Center
Bannon, Joseph J.
Intended for professional planners and recreation and park administrators as well as for classroom use, this comprehensive planning guide for leisure resources includes: (1) a planning process overview with emphasis on the necessity of both citizen and professional involvement; (2) practical administrative and organizational needs for undertaking…
13 CFR 307.9 - Revolving Loan Fund Plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... lending area under § 307.18, a change in critical management staff, or a change to the strategic purpose...-approved economic development plan, if applicable, for the Region. (2) The Plan must identify the strategic... management procedures, including loan processing, underwriting, closing, disbursements, collections...
Pandemic Ventilator Rationing and Appeals Processes
Patrone, Daniel; Resnik, David
2014-01-01
In a severe influenza pandemic, hospitals will likely experience serious and widespread shortages of patient pulmonary ventilators and of staff qualified to operate them. Deciding who will receive access to mechanical ventilation will often determine who lives and who dies. This prospect raises an important question whether pandemic preparedness plans should include some process by which individuals affected by ventilator rationing would have the opportunity to appeal adverse decisions. However, the issue of appeals processes to ventilator rationing decisions has been largely neglected in state pandemic planning efforts. If we are to devise just and effective plans for coping with a severe influenza pandemic, more attention to the issue of appeals processes for pandemic ventilator rationing decisions is needed. Arguments for and against appeals processes are considered, and some suggestions are offered to help efforts at devising more rational pandemic preparedness plans. PMID:20354793
Pandemic ventilator rationing and appeals processes.
Patrone, Daniel; Resnik, David
2011-06-01
In a severe influenza pandemic, hospitals will likely experience serious and widespread shortages of patient pulmonary ventilators and of staff qualified to operate them. Deciding who will receive access to mechanical ventilation will often determine who lives and who dies. This prospect raises an important question whether pandemic preparedness plans should include some process by which individuals affected by ventilator rationing would have the opportunity to appeal adverse decisions. However, the issue of appeals processes to ventilator rationing decisions has been largely neglected in state pandemic planning efforts. If we are to devise just and effective plans for coping with a severe influenza pandemic, more attention to the issue of appeals processes for pandemic ventilator rationing decisions is needed. Arguments for and against appeals processes are considered, and some suggestions are offered to help efforts at devising more rational pandemic preparedness plans.
The Implications of Service-Learning for Technology Studies.
ERIC Educational Resources Information Center
Folkestad, James E.; Senior, Bolivar A.; DeMirana, Michael A.
2002-01-01
A "toys for tots" service-learning experience integrated into an industrial technology management course required development and planning using a process planning and costing model and work with a variety of stakeholders including an Even-Start learning center. Challenges include the lack of service-learning precedent in technology studies and…
Charter School Facilities: A Resource Guide on Development and Financing.
ERIC Educational Resources Information Center
Jakubowski, Lara
This manual provides information to help charter schools navigate the facility development process, including worksheets that can be customized to suit a particular school's needs. Sections cover how facility planning fits into business planning for charter schools, review a process for assessing a school's facility needs, and summarize how to…
ERIC Educational Resources Information Center
Evan-Wong, Sue; de Freitas, Claudette
1995-01-01
Presents a methodology for marketing an information service which focuses on including information users in the strategic marketing planning process. Identifies the following stages of a marketing planning process: analysis of the environment, information audit, information needs assessment, market opportunity analysis, tactical marketing program,…
Designing automatic resupply systems.
Harding, M L
1999-02-01
This article outlines the process for designing and implementing autoresupply systems. The planning process includes determination of goals and appropriate participation. Different types of autoresupply mechanisms include kanban, breadman, consignment, systems contracts, and direct shipping from an MRP schedule.
Priority-setting and hospital strategic planning: a qualitative case study.
Martin, Douglas; Shulman, Ken; Santiago-Sorrell, Patricia; Singer, Peter
2003-10-01
To describe and evaluate the priority-setting element of a hospital's strategic planning process. Qualitative case study and evaluation against the conditions of 'accountability for reasonableness' of a strategic planning process at a large urban university-affiliated hospital. The hospital's strategic planning process met the conditions of 'accountability for reasonableness' in large part. Specifically: the hospital based its decisions on reasons (both information and criteria) that the participants felt were relevant to the hospital; the number and type of participants were very extensive; the process, decisions and reasons were well communicated throughout the organization, using multiple communication vehicles; and the process included an ethical framework linked to an effort to evaluate and improve the process. However, there were opportunities to improve the process, particularly by giving participants more time to absorb the information relevant to priority-setting decisions, more time to take difficult decisions and some means to appeal or revise decisions. A case study linked to an evaluation using 'accountability for reasonableness' can serve to improve priority-setting in the context of hospital strategic planning.
Preparing for possible motor fuel shortages: a community planning guide, Roswell, New Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This guide is prepared to provide a practical approach for the community of Roswell, New Mexico, to respond to fuel supply disruptions. It contains: overviews highlighting fuel supplies and government roles in emergency transportation planning; factors in contingency planning which include community profiles, needs, resources, and constraints; and the local emergency planning process. (MHR)
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
...; Amendment to the Targhee Revised Forest Plan--Canada Lynx Habitat AGENCY: Forest Service, USDA. ACTION... Forest proposes to amend the Targhee Revised Forest Plan (1997) to include a map identifying specific... Administrative Review Process: The decision on this proposed plan amendment will be subject to the objection...
Medical imaging and registration in computer assisted surgery.
Simon, D A; Lavallée, S
1998-09-01
Imaging, sensing, and computing technologies that are being introduced to aid in the planning and execution of surgical procedures are providing orthopaedic surgeons with a powerful new set of tools for improving clinical accuracy, reliability, and patient outcomes while reducing costs and operating times. Current computer assisted surgery systems typically include a measurement process for collecting patient specific medical data, a decision making process for generating a surgical plan, a registration process for aligning the surgical plan to the patient, and an action process for accurately achieving the goals specified in the plan. Some of the key concepts in computer assisted surgery applied to orthopaedics with a focus on the basic framework and underlying technologies is outlined. In addition, technical challenges and future trends in the field are discussed.
1989-08-01
microproces;qor databaAing systems for monitoring project and contract reports and program technology trans. fers, coordinating and providing administratIvo ...The JWGD 3 annual planning process generally included: - Program review by the JWGD’ membership at quarterly meetings, which consisted of the review...Office developed the program planning and budget documents associated with the planning process outlined above. Program project databases and
Speak Up Speak Out Coalition Survey Results | Science ...
Comprehensive planning is a visionary planning process that integrates community values and land use policy. The Mayor of Duluth, Minnesota, directed the inclusion of two new values into the City’s comprehensive planning process to direct the community’s future, process: health and fairness. In order to understand the meanings of health and fairness that residents of the city hold, the Community Planning Department included questions in a city-wide survey of planning priorities. As a community organization reviewed the survey results that would inform the new directives, they realized that overburdened communities were underrepresented in the survey responses. To address this deficiency, the community organization asked the City of Duluth if they could conduct a survey of the underrepresented voices to ensure their input was included in the process. The Health in All Policies Coalition contacted the USEPA Office of Research and Development in Duluth, MN at the advice of the Planning Department. The support USEPA provided ensured that the Coalition could make recommendations to the City of Duluth based on systematically collected and analyzed data. This presentation will share the results of the survey. This presentation of the Speak Up Speak Out survey data represents support for local decision-making, technical assistance and data analysis. The data were collected and analyzed through advice and consultation with USEPA Office of Research and Development, an
College Planning for Gifted Students.
ERIC Educational Resources Information Center
Berger, Sandra L.
This paper asserts that for gifted students, college planning should be one step in a life development process that takes place between 7th and 12th grades. Characteristics of gifted students that affect their college planning include multipotentiality, sensitivity to competing expectations, uneven development, ownership of their abilities,…
Planning and conducting a multi-institutional project on fatigue.
Nail, L M; Barsevick, A M; Meek, P M; Beck, S L; Jones, L S; Walker, B L; Whitmer, K R; Schwartz, A L; Stephen, S; King, M E
1998-09-01
To describe the process used in proposal development and study implementation for a complex multisite project on cancer treatment-related fatigue (CRF), identify strategies used to manage the project, and provide recommendations for teams planning multisite research. Information derived from project team meeting records, correspondence, proposals, and personal recollection. The project was built on preexisting relationships among the three site investigators who then built a team including faculty, research coordinators, staff nurses, and students. Study sites had a range of organizational models, and the proposal was designed to capitalize on the organizational and resource strengths of each setting. Three team members drawn from outside oncology nursing provided expertise in measurement and experience with fatigue in other populations. Planning meetings were critical to the success of the project. Conference calls, fax technology, and electronic mail were used for communication. Flexibility was important in managing crises and shifting responsibility for specific components of the work. The team documented and evaluated the process used for multisite research, completed a major instrumentation study, and developed a cognitive-behavioral intervention for CRF. Accomplishments during the one-year planning grant exceeded initial expectations. The process of conducting multisite research is complex, especially when the starting point is a planning grant with specific research protocols to be developed and implemented over one year. Explicit planning for decision-making processes to be used throughout the project, acknowledging the differences among the study settings and planning the protocols to capitalize upon those differences, and recruiting a strong research team that included a member with planning grant and team-building expertise were essential elements for success. Specific recommendations for others planning multisite research are related to team-building, team membership, communication, behavioral norms, role flexibility, resources, feedback, problem management, and shared recognition.
IT strategic planning in hospitals: from theory to practice.
Jaana, Mirou; Teitelbaum, Mari; Roffey, Tyson
2014-07-01
To date, IT strategic planning has been mostly theory-based with limited information on "best practices" in this area. This study presents the process and outcomes of IT strategic planning undertaken at a pediatric hospital (PH) in Canada. A five-stage sequential and incremental process was adopted. Various tools / approaches were used including review of existing documentation, internal survey (n = 111), fifteen interviews, and twelve workshops. IT strategic planning was informed by 230 individuals (12 percent of hospital community) and revealed consistency in the themes and concerns raised by participants (e.g., slow IT projects delivery rate, lack of understanding of IT priorities, strained communication with IT staff). Mobile and remote access to patients' information, and an integrated EMR were identified as top priorities. The methodology and used approach revealed effective, improved internal relationships, and ensured commitment to the final IT strategic plan. Several lessons were learned including: maintaining a dynamic approach capable of adapting to the fast technology evolution; involving stakeholders and ensuring continuous communication; using effective research tools to support strategic planning; and grounding the process and final product in existing models. This study contributes to the development of "best practices" in IT strategic planning, and illustrates "how" to apply the theoretical principles in this area. This is especially important as IT leaders are encouraged to integrate evidence-based management into their decision making and practices. The methodology and lessons learned may inform practitioners in other hospitals planning to engage in IT strategic planning in the future.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heubach, J.G.; Weimer, W.C.; Bruce, W.A.
Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less
Strategic planning processes and hospital financial performance.
Kaissi, Amer A; Begun, James W
2008-01-01
Many common management practices in healthcare organizations, including the practice of strategic planning, have not been subject to widespread assessment through empirical research. If management practice is to be evidence-based, evaluations of such common practices need to be undertaken. The purpose of this research is to provide evidence on the extent of strategic planning practices and the association between hospital strategic planning processes and financial performance. In 2006, we surveyed a sample of 138 chief executive officers (CEOs) of hospitals in the state of Texas about strategic planning in their organizations and collected financial information on the hospitals for 2003. Among the sample hospitals, 87 percent reported having a strategic plan, and most reported that they followed a variety of common practices recommended for strategic planning-having a comprehensive plan, involving physicians, involving the board, and implementing the plan. About one-half of the hospitals assigned responsibility for the plan to the CEO. We tested the association between these planning characteristics in 2006 and two measures of financial performance for 2003. Three dimensions of the strategic planning process--having a strategic plan, assigning the CEO responsibility for the plan, and involving the board--are positively associated with earlier financial performance. Further longitudinal studies are needed to evaluate the cause-and-effect relationship between planning and performance.
WFIRST: User and mission support at ISOC - IPAC Science Operations Center
NASA Astrophysics Data System (ADS)
Akeson, Rachel; Armus, Lee; Bennett, Lee; Colbert, James; Helou, George; Kirkpatrick, J. Davy; Laine, Seppo; Meshkat, Tiffany; Paladini, Roberta; Ramirez, Solange; Wang, Yun; Xie, Joan; Yan, Lin
2018-01-01
The science center for WFIRST is distributed between the Goddard Space Flight Center, the Infrared Processing and Analysis Center (IPAC) and the Space Telescope Science Institute (STScI). The main functions of the IPAC Science Operations Center (ISOC) are:* Conduct the GO, archival and theory proposal submission and evaluation process* Support the coronagraph instrument, including observation planning, calibration and data processing pipeline, generation of data products, and user support* Microlensing survey data processing pipeline, generation of data products, and user support* Community engagement including conferences, workshops and general support of the WFIRST exoplanet communityWe will describe the components planned to support these functions and the community of WFIRST users.
Incorporating healthcare informatics into the strategic planning process in nursing education.
Sackett, Kay; Jones, Janice; Erdley, W Scott
2005-01-01
The purpose of this article is to describe the incorporation of healthcare informatics into the strategic planning process in nursing education. An exemplar from the University at Buffalo, the State University of New York School of Nursing, is interwoven throughout the article. The challenges and successes inherent in a paradigm shift embracing the multifaceted adoption of technology in higher education are illustrated. The paradigm shift that necessitated this change, the need for informatics standards and competencies identified by regulatory agencies and the relationship of the triad mission of the Academy which includes research, teaching and service are then elucidated. Information pertinent to the strategic planning process is described including the use of a strengths, weaknesses, opportunities and threats (SWOT) analysis to facilitate the integration of a healthcare informatics model into a nursing curriculum.
78 FR 14556 - Proposed Information Collection Activity; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
... for ACF. OMB No.: 0992-0005. Description: The Advance Planning Document (APD) process, established in... Biennial Reports 54 1 1.50 81 Advance Planning Document 34 1.2 120 4,896 Operational Advance Planning... for the proper performance of the functions of the agency, including whether the information shall...
Ten Benefits of Participant Action Planning.
ERIC Educational Resources Information Center
Youker, Robert B.
1985-01-01
Describes the Participant Action Planning Approach (PAPA) process that requires each trainee to prepare a list of concrete actions or changes he or she plans to make back on the job once the training program is over. Benefits of PAPA are discussed, including transfer of learning, verbalization, and commitment. (CT)
OCCUPATIONAL EDUCATION--PLANNING AND PROGRAMMING. VOLUME TWO.
ERIC Educational Resources Information Center
KOTZ, ARNOLD
ADDITIONAL POSITION PAPERS BASED ON INFORMATION GATHERED IN THE RECONNAISSANCE SURVEYS OF PLANNING AND PROGRAMING IN OCCUPATIONAL EDUCATION, REPORTED IN VOLUME ONE (VT 005 041), ARE PRESENTED. PART IV, CONCERNED WITH PROGRAM STRUCTURE AND BUDGETING AND THEIR RELATION TO THE PLANNING PROCESS, INCLUDES THE PAPERS--(1) "CURRENT POLICIES AND…
10 CFR 600.315 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
....315 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL ASSISTANCE RULES... Requirements § 600.315 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the award process. It includes the sum of the Federal and...
Do You Have a Crisis Management Plan?
ERIC Educational Resources Information Center
Pleviak, Walter; Milkevitch, Frank
2001-01-01
Although certain crises cannot be prevented, reactions to many can be planned. A crisis-management team should be organized for each building. Critical crisis-plan elements include telephone trees, forms, reference articles, sample letters, and processes for dealing with local media. Spokespersons should have facts straight before speaking. (MLH)
Developmental Planning: An Introduction for Parents
ERIC Educational Resources Information Center
Noland, Jim
2009-01-01
"Developmental Planning" is the thinking process of using developmental milestones as a general basis for planning and predicting needs for the child within the early years. It considers the time frames associated with normal development across all facets of the child's development. The areas include bone and joint development, movement, sensory…
Family and Consumer Sciences: A Facility Planning and Design Guide for School Systems.
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
This document presents design concepts and considerations for planning and developing middle and high school family and consumer sciences education facilities. It includes discussions on family and consumer sciences education trends and the facility planning process. Design concepts explore multipurpose laboratories and spaces for food/nutrition…
ERIC Educational Resources Information Center
Huff-Eibl, Robyn; Miller-Wells, John; Begay, Wendy
2014-01-01
This article describes the process and role frontline access and public service staff play in needs assessment and evaluation of user services, specifically in understanding the voice of the customer. Information includes how the University of Arizona Libraries have incorporated daily data collection into the strategic planning process, resources…
Computer Processing 10-20-30. Teacher's Manual. Senior High School Teacher Resource Manual.
ERIC Educational Resources Information Center
Fisher, Mel; Lautt, Ray
Designed to help teachers meet the program objectives for the computer processing curriculum for senior high schools in the province of Alberta, Canada, this resource manual includes the following sections: (1) program objectives; (2) a flowchart of curriculum modules; (3) suggestions for short- and long-range planning; (4) sample lesson plans;…
ERIC Educational Resources Information Center
Kochanek, Thomas T.; Friedman, Donna Haig
The monograph presents essential components of a decision making sequence used to incorporate formalized family assessment and service planning procedures into two existing early intervention programs in Massachusetts. The 1-year effort used a consultant to: (1) redefine screening and assessment processes to include both child and family centered…
ERIC Educational Resources Information Center
Parker, Elizabeth Cassidy; Bond, Vanessa L.; Powell, Sean R.
2017-01-01
The purpose of this grounded theory study was to understand the process of field experience lesson planning for preservice music educators enrolled in choral, general, and instrumental music education courses within three university contexts. Data sources included multiple interviews, written responses, and field texts from 42 participants. Four…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clifford, M.J.; Wickstrom, G.V.
1983-10-01
Preferred treatment of high occupancy vehicles (HOV's), through strategies such as dedicated lanes, can achieve transportation energy conservation. The research presented in this report provides a method for regional planning agencies to assess such HOV facilities, from a travel demand and energy consumption standpoint. The planning process is described and applied in a case study. Products of the case study included estimates of carpool formation and associated fuel savings, and traffic operations on HOV and other facilities in the corridor. The completed process represents a method to examine HOV's under a variety of policy and operational conditions. The process ismore » within the modeling capabilities of other Metropolitan Planning Organizations (MPO's) and should be transferable to other cities and corridors. Additional applications of the HOV estimation and evaluation process are recommended.« less
Gaining efficiency by centralising the corporate business resiliency process.
Martinez, Robert
2017-06-01
Organisations have compiled many business continuity plans over the years in response to uncontrollable events and natural disasters. As the types of threats increase, even more plans are being created. Unfortunately, many corporations do not communicate the existence of these various plans outside of their centre of excellence. Creating a centralised oversight of your business resiliency process brings many benefits, including greater awareness, a bigger pool of expertise, common terminology and reducing the chances of redundant efforts. Having an overarching corporate response plan in place makes it possible to have high-level leadership trained and ready in case an extreme event occurs.
NASA earth science and applications division: The program and plans for FY 1988-1989-1990
NASA Technical Reports Server (NTRS)
1988-01-01
Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.
Sridharan, Sanjeev; Go, Sodam; Zinzow, Heidi; Gray, Aracelis; Barrett, Melissa Gutierrez
2007-02-01
In order to achieve the intended impact on a community, comprehensive community initiatives must sustain programs once they have been implemented. However, planning for sustainability is challenging and is rarely incorporated in the planning process of an initiative. The current study examined 19 5-year plans developed during the planning phase of the Comprehensive Strategy for Serious, Violent and Chronic Juvenile Offenders. Quantitative and qualitative methods were employed to assess the extent to which the construct of sustainability was incorporated. The plan analysis was supplemented with results from other components of the complex evaluation design implemented as part of the process evaluation of Comprehensive Strategy. Results suggested that sustainability was not accounted for during the planning phase of this initiative. The implications of these findings, including the importance of planning for sustainability in order to achieve sustainability, are discussed.
Future directions: Integrated resource planning
NASA Astrophysics Data System (ADS)
Bauer, D. C.; Eto, J.
Integrated resource planning or IRP is the process for integrating supply- and demand-side resources to provide energy services at a cost that balances the interests of all stakeholders. It now is the resource planning process used by electric utilities in over 30 states. The goals of IRP have evolved from least cost planning and encouragement of demand-side management to broader, more complex issues including core competitive business activity, risk management and sharing, accounting for externalities, and fuel switching between gas and electricity. IRP processes are being extended to other interior regions of the country, to non-investor owned utilities, and to regional (rather than individual utility) planning bases, and to other fuels (natural gas). The comprehensive, multi-valued, and public reasoning characteristics of IRP could be extended to applications beyond energy, e.g., transportation, surface water management, and health care in ways suggested.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Purdie, Thomas G., E-mail: Tom.Purdie@rmp.uhn.on.ca; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; Techna Institute, University Health Network, Toronto, Ontario
Purpose: To demonstrate the large-scale clinical implementation and performance of an automated treatment planning methodology for tangential breast intensity modulated radiation therapy (IMRT). Methods and Materials: Automated planning was used to prospectively plan tangential breast IMRT treatment for 1661 patients between June 2009 and November 2012. The automated planning method emulates the manual steps performed by the user during treatment planning, including anatomical segmentation, beam placement, optimization, dose calculation, and plan documentation. The user specifies clinical requirements of the plan to be generated through a user interface embedded in the planning system. The automated method uses heuristic algorithms to definemore » and simplify the technical aspects of the treatment planning process. Results: Automated planning was used in 1661 of 1708 patients receiving tangential breast IMRT during the time interval studied. Therefore, automated planning was applicable in greater than 97% of cases. The time for treatment planning using the automated process is routinely 5 to 6 minutes on standard commercially available planning hardware. We have shown a consistent reduction in plan rejections from plan reviews through the standard quality control process or weekly quality review multidisciplinary breast rounds as we have automated the planning process for tangential breast IMRT. Clinical plan acceptance increased from 97.3% using our previous semiautomated inverse method to 98.9% using the fully automated method. Conclusions: Automation has become the routine standard method for treatment planning of tangential breast IMRT at our institution and is clinically feasible on a large scale. The method has wide clinical applicability and can add tremendous efficiency, standardization, and quality to the current treatment planning process. The use of automated methods can allow centers to more rapidly adopt IMRT and enhance access to the documented improvements in care for breast cancer patients, using technologies that are widely available and already in clinical use.« less
Purdie, Thomas G; Dinniwell, Robert E; Fyles, Anthony; Sharpe, Michael B
2014-11-01
To demonstrate the large-scale clinical implementation and performance of an automated treatment planning methodology for tangential breast intensity modulated radiation therapy (IMRT). Automated planning was used to prospectively plan tangential breast IMRT treatment for 1661 patients between June 2009 and November 2012. The automated planning method emulates the manual steps performed by the user during treatment planning, including anatomical segmentation, beam placement, optimization, dose calculation, and plan documentation. The user specifies clinical requirements of the plan to be generated through a user interface embedded in the planning system. The automated method uses heuristic algorithms to define and simplify the technical aspects of the treatment planning process. Automated planning was used in 1661 of 1708 patients receiving tangential breast IMRT during the time interval studied. Therefore, automated planning was applicable in greater than 97% of cases. The time for treatment planning using the automated process is routinely 5 to 6 minutes on standard commercially available planning hardware. We have shown a consistent reduction in plan rejections from plan reviews through the standard quality control process or weekly quality review multidisciplinary breast rounds as we have automated the planning process for tangential breast IMRT. Clinical plan acceptance increased from 97.3% using our previous semiautomated inverse method to 98.9% using the fully automated method. Automation has become the routine standard method for treatment planning of tangential breast IMRT at our institution and is clinically feasible on a large scale. The method has wide clinical applicability and can add tremendous efficiency, standardization, and quality to the current treatment planning process. The use of automated methods can allow centers to more rapidly adopt IMRT and enhance access to the documented improvements in care for breast cancer patients, using technologies that are widely available and already in clinical use. Copyright © 2014 Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Hooker, Stanford B.; McClain, Charles R.; Mannino, Antonio
2007-01-01
The primary objective of this planning document is to establish a long-term capability and validating oceanic biogeochemical satellite data. It is a pragmatic solution to a practical problem based primarily o the lessons learned from prior satellite missions. All of the plan's elements are seen to be interdependent, so a horizontal organizational scheme is anticipated wherein the overall leadership comes from the NASA Ocean Biology and Biogeochemistry (OBB) Program Manager and the entire enterprise is split into two components of equal sature: calibration and validation plus satellite data processing. The detailed elements of the activity are based on the basic tasks of the two main components plus the current objectives of the Carbon Cycle and Ecosystems Roadmap. The former is distinguished by an internal core set of responsibilities and the latter is facilitated through an external connecting-core ring of competed or contracted activities. The core elements for the calibration and validation component include a) publish protocols and performance metrics; b) verify uncertainty budgets; c) manage the development and evaluation of instrumentation; and d) coordinate international partnerships. The core elements for the satellite data processing component are e) process and reprocess multisensor data; f) acquire, distribute, and archive data products; and g) implement new data products. Both components have shared responsibilities for initializing and temporally monitoring satellite calibration. Connecting-core elements include (but are not restricted to) atmospheric correction and characterization, standards and traceability, instrument and analysis round robins, field campaigns and vicarious calibration sites, in situ database, bio-optical algorithm (and product) validation, satellite characterization and vicarious calibration, and image processing software. The plan also includes an accountability process, creating a Calibration and Validation Team (to help manage the activity), and a discussion of issues associated with the plan's scientific focus.
NASA Technical Reports Server (NTRS)
1973-01-01
The findings and recommendations of the Materials Processing and Space Manufacturing group of the space shuttle payload planning activity are presented. The effects of weightlessness on the levitation processes, mixture stability, and control over heat and mass transport in fluids are considered for investigation. The research and development projects include: (1) metallurgical processes, (2) electronic materials, (3) biological applications, and (4)nonmetallic materials and processes. Additional recommendations are provided concerning the allocation of payload space, acceptance of experiments for flight, flight qualification, and private use of the space shuttle.
Medical Devices Transition to Information Systems: Lessons Learned
Charters, Kathleen G.
2012-01-01
Medical devices designed to network can share data with a Clinical Information System (CIS), making that data available within clinician workflow. Some lessons learned by transitioning anesthesia reporting and monitoring devices (ARMDs) on a local area network (LAN) to integration of anesthesia documentation within a CIS include the following categories: access, contracting, deployment, implementation, planning, security, support, training and workflow integration. Areas identified for improvement include: Vendor requirements for access reconciled with the organizations’ security policies and procedures. Include clauses supporting transition from stand-alone devices to information integrated into clinical workflow in the medical device procurement contract. Resolve deployment and implementation barriers that make the process less efficient and more costly. Include effective field communication and creative alternatives in planning. Build training on the baseline knowledge of trainees. Include effective help desk processes and metrics. Have a process for determining where problems originate when systems share information. PMID:24199054
Strategic planning by independent community pharmacies.
Harrison, Donald L
2005-01-01
(1) To assess the degree and level of use of the strategic planning process (none, partly, fully) by independent community pharmacy owners/managers and (2) to evaluate the relationships between independent community pharmacy owners/managers' level of strategic planning and indicators of pharmacy performance; including new and refill prescriptions filled, gross margin, rated patient care performance, rated dispensing performance, rated non-pharmacy performance, and rated financial performance. Cross-sectional study. United States. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Quality of strategic planning conducted; pharmacy performance measures. Only 141 of 527 (26.8%) usable responses indicated use of some (77 pharmacies, 54.6%) or all (64 pharmacies, 45.4%) of the seven steps typical of strategic planning. Significant associations were observed between the level of strategic planning use and all pharmacy performance variables assessed, including indicators such as greater numbers of new and refill prescriptions dispensed, gross margins, patient care performance, dispensing performance, non-pharmacy performance, and financial performance. Greater ratings of pharmacy performance were significantly associated with the level of strategic planning use. Respondents who fully used strategic planning had significantly higher indicators than partial users; respondents who partly used the process had significantly higher ratings than respondents who did not conduct strategic planning.
Troyer, Caitlin M; Gerber, Leah R
2015-10-01
The Endangered Species Act (ESA) of the United States was enacted in 1973 to prevent the extinction of species. Recovery plans, required by 1988 amendments to the ESA, play an important role in organizing these efforts to protect and recover species. To improve the use of science in the recovery planning process, the Society for Conservation Biology (SCB) commissioned an independent review of endangered species recovery planning in 1999. From these findings, the SCB made key recommendations for how management agencies could improve the recovery planning process, after which the U.S. Fish and Wildlife Service and the National Marine Fisheries Service redrafted their recovery planning guidelines. One important recommendation called for recovery plans to make threats a primary focus, including organizing and prioritizing recovery tasks for threat abatement. We sought to determine the extent to which results from the SCB study were incorporated into these new guidelines and whether the SCB recommendations regarding threats manifested in recovery plans written under the new guidelines. Recovery planning guidelines generally incorporated the SCB recommendations, including those for managing threats. However, although recent recovery plans have improved in their treatment of threats, many fail to adequately incorporate threat monitoring. This failure suggests that developing clear guidelines for monitoring should be an important priority in improving ESA recovery planning. © 2015 Society for Conservation Biology.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-31
... capital base and promote best practices for capital adequacy planning and stress testing. We view high... minimum supervisory standards for the capital planning process, including stress testing, (ii) describes... stress tests to ensure they are able to sustain financial soundness under adverse market conditions. In...
9 CFR 430.4 - Control of Listeria monocytogenes in post-lethality exposed ready-to-eat products.
Code of Federal Regulations, 2011 CFR
2011-01-01
... products must control through its HACCP plan or prevent in the processing environment through a Sanitation...: (i) The post-lethality treatment must be included in the establishment's HACCP plan. The... the establishment's HACCP plan or its Sanitation SOP or other prerequisite program. (ii) The...
9 CFR 430.4 - Control of Listeria monocytogenes in post-lethality exposed ready-to-eat products.
Code of Federal Regulations, 2010 CFR
2010-01-01
... products must control through its HACCP plan or prevent in the processing environment through a Sanitation...: (i) The post-lethality treatment must be included in the establishment's HACCP plan. The... the establishment's HACCP plan or its Sanitation SOP or other prerequisite program. (ii) The...
Birth Planning Values and Decisions: Preliminary Findings.
ERIC Educational Resources Information Center
Townes, Brenda D.; And Others
The values and processes which underlie people's birth planning decisions were studied via decision theory. Sixty-three married couples including 23 with no children, 33 with one child, and 27 with two children were presented with a large set of personal values related to birth planning decisions. Individuals rated the importance or utility of…
ERIC Educational Resources Information Center
Szidon, Katherine; Ruppar, Andrea; Smith, Leann
2015-01-01
The Individuals With Disabilities Education Act (IDEA; 2006) requires schools to develop transition plans for students with disabilities, beginning at age 16, if not before. For students with autism spectrum disorder (ASD), the transition planning process includes unique considerations. This article describes five steps for developing effective…
A Revenue Planning Tool for Charter School Operators
ERIC Educational Resources Information Center
Keller, Eric; Hayes, Cheryl D.
2009-01-01
This revenue planning tool aims to help charter school operators develop a sound revenue base that can meet their school's current and future funding needs. It helps identify and assess potential public (federal, state, and local) and private funding sources. The tool incorporates a four-step revenue planning process which includes: (1)…
ERIC Educational Resources Information Center
Rocchio, Richard; Lee, Eve
This guide demonstrates a new way of utilizing the planning process within a social movement context in view of developing a state master plan for environmental education. In addition the book serves as a guide to realistic planning, including models, definitions, and examples. The guide contains five parts: Part One - The background, Part Two -…
Using a virtual world for robot planning
NASA Astrophysics Data System (ADS)
Benjamin, D. Paul; Monaco, John V.; Lin, Yixia; Funk, Christopher; Lyons, Damian
2012-06-01
We are building a robot cognitive architecture that constructs a real-time virtual copy of itself and its environment, including people, and uses the model to process perceptual information and to plan its movements. This paper describes the structure of this architecture. The software components of this architecture include PhysX for the virtual world, OpenCV and the Point Cloud Library for visual processing, and the Soar cognitive architecture that controls the perceptual processing and task planning. The RS (Robot Schemas) language is implemented in Soar, providing the ability to reason about concurrency and time. This Soar/RS component controls visual processing, deciding which objects and dynamics to render into PhysX, and the degree of detail required for the task. As the robot runs, its virtual model diverges from physical reality, and errors grow. The Match-Mediated Difference component monitors these errors by comparing the visual data with corresponding data from virtual cameras, and notifies Soar/RS of significant differences, e.g. a new object that appears, or an object that changes direction unexpectedly. Soar/RS can then run PhysX much faster than real-time and search among possible future world paths to plan the robot's actions. We report experimental results in indoor environments.
7 Processes that Enable NASA Software Engineering Technologies: Value-Added Process Engineering
NASA Technical Reports Server (NTRS)
Housch, Helen; Godfrey, Sally
2011-01-01
The presentation reviews Agency process requirements and the purpose, benefits, and experiences or seven software engineering processes. The processes include: product integration, configuration management, verification, software assurance, measurement and analysis, requirements management, and planning and monitoring.
National Conference on Integrated Resource Planning: Proceedings
NASA Astrophysics Data System (ADS)
Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; and key regulatory issues facing gas utilities during the next five years.
O'Shanahan Juan, José Joaquín; Hernández Rodríguez, Miguel Ángel; Del Otero Sanz, Laura; Henríquez Suárez, José Andrés; Mahtani Chugani, Vinita
The need for new approaches to strategic planning by incorporating the perspectives of professionals and inhabitants has led to a new model for the 3rd Canary Islands (Spain) Health Plan (IIIPSC). A dual-phase participatory process using qualitative techniques is proposed: 1) local phase: a quantitative and qualitative study based on training and a research-action-participation initiative; and 2) insular phase: health conferences with face-to-face discussion of results in each health area (island) and proposals for action. The process prioritises problems and establishes a specific action plan for each island through initiatives that are considered to be viable, grouped by themes and weighted according to the potential impact on priority problems. This process of interaction may help to guide planning model changes and health policy decision-making, and was included in the IIIPSC Project for its parliamentary procedure. Copyright © 2016 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.
Urban transportation planning in the United States : an historical overview
DOT National Transportation Integrated Search
1997-09-01
The report focuses on key events in the evolution of urban transportation planning including developments in technical procedures, philosophy, processes and institutions. But, planners must also be aware of changes in legislation, policy, regulations...
Ames Research Center FY 2000 Implementation Plan: Leading Technology into the New Millennium
NASA Technical Reports Server (NTRS)
2000-01-01
This document presents the implementation plan for Ames Research Center (ARC) within the overall framework of the NASA Strategic Plan. It describes how ARC intends to implement its Center of Excellence responsibilities, Agency assigned missions, Agency and Enterprise lead programs, and other roles in support of NASA's vision and mission. All Federal agencies are required by the 1993 Government Performance and Results Act to implement a long-term strategic planning process that includes measurable outcomes and strict accountability. At NASA, this planning process is shaped by the Space Act of 1958, annual appropriations, and other external mandates, as well as by customer requirements. The resulting Strategic Plan sets the overall architecture for what we do, identifies who our customers are, and directs where we are going and why. The Strategic Plan is the basis upon which decisions regarding program implementation and resource deployment are made. Whereas the strategic planning process examines the long-term direction of the organization and identifies a specific set of goals, the implementation planning process examines the detailed performance of the organization and allocates resources toward meeting these goals. It is the purpose of this implementation document to provide the connection between the NASA Strategic Plan and the specific programs and support functions that ARC employees perform. This connection flows from the NASA Strategic Plan, through the various Strategic Enterprise plans to the ARC Center of Excellence, primary missions, Lead Center programs, program support responsibilities, and ultimately, to the role of the individual ARC employee.
IUS/TUG orbital operations and mission support study. Volume 4: Project planning data
NASA Technical Reports Server (NTRS)
1975-01-01
Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.
Tracking the Short Term Planning (STP) Development Process
NASA Technical Reports Server (NTRS)
Price, Melanie; Moore, Alexander
2010-01-01
Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."
Phoenix, Michelle; Rosenbaum, Peter; Watson, Denise; Camden, Chantal
2016-01-01
Pediatric rehabilitation centers constantly reorganize services to accommodate changes in funding, client needs, evidence-based practices, accountability requirements, theoretical models, and values. However, there are few service delivery models or descriptions of how organizations plan for change to guide organizations through this complex task. This case report presents the "5Rs of Reorganization," a novel process for planning service delivery reorganization projects in pediatric rehabilitation centers. The 5Rs include: 1. Recognize the need for change, 2. Reallocate resources for project management, 3. Review the reality of clients, service delivery, and the community, 4. Reconstruct reality, and 5. Report results. The implementation and outcomes of the "5Rs of Reorganization" process are described for one pediatric rehabilitation center to illustrate how use of this process led to effective service delivery reorganization planning. The resulting multi-component customized service delivery plan reflects high levels of stakeholder involvement. Principles of project management can be applied to support service delivery reorganization planning within pediatric rehabilitation centers using the "5Rs of Reorganization." Strong communication throughout the planning phase is key to developing and sharing a plan for service delivery reorganization. Communication can be supported through use of the 5R process.
A key to success: optimizing the planning process
NASA Astrophysics Data System (ADS)
Turk, Huseyin; Karakaya, Kamil
2014-05-01
By adopting The NATO Strategic Concept Document in 2010, some important changes in the perception of threat and management of crisis were introduced. This new concept, named ''Comprehensive Approach'', includes the precautions of pre-crisis management, applications of crisis-duration management and reconstruction phase of post-intervention management. NATO will be interested in not only the political and military options , but also social, economical and informational aspects of crisis. NATO will take place in all phases of conflict. The conflicts which occur outside the borders of NATO's nations and terrorism are perceived as threat sources for peace and stability. In addition to conventional threats, cyber attacks which threaten network-supported communication systems, preventing applications from accessing to space that will be used in different fields of life. On the other hand, electronic warfare capabilities which can effect us negatively are added to threat list as new threats. In the process in which military is thought as option, a harder planning phase is waiting for NATO's decision makers who struggle for keeping peace and security. Operation planning process which depends on comprehensive approach, contains these steps: Situational awareness of battlefield, evaluation of the military intervention options, orientation, developing an operation plan, reviewing the plan and transition phases.1 To be successful in theater which is always changing with the technological advances, there has to be an accurate and timely planning on the table. So, spending time for planning can be shown as one of the biggest problem. In addition, sustaining situational awareness which is important for the whole operation planning process, technical command and control hitches, human factor, inability to determine the center of gravity of opponent in asymmetrical threat situations can be described as some of the difficulties in operation planning. In this study, a possible air operation planning process is analyzed according to a comprehensive approach. The difficulties of planning are identified. Consequently, for optimizing a decisionmaking process of an air operation, a planning process is identified in a virtual command and control structure.
A Successful Infusion Process for Enabling Lunar Exploration Technologies
NASA Technical Reports Server (NTRS)
Over, Ann P.; Klem, Mark K.; Motil, Susan M.
2008-01-01
The NASA Vision for Space Exploration begins with a more reliable flight capability to the International Space Station and ends with sending humans to Mars. An important stepping stone on the path to Mars encompasses human missions to the Moon. There is little doubt throughout the stakeholder community that new technologies will be required to enable this Vision. However, there are many factors that influence the ability to successfully infuse any technology including the technical risk, requirement and development schedule maturity, and, funds available. This paper focuses on effective infusion processes that have been used recently for the technologies in development for the lunar exploration flight program, Constellation. Recent successes with Constellation customers are highlighted for the Exploration Technology Development Program (ETDP) Projects managed by NASA Glenn Research Center (GRC). Following an overview of the technical context of both the flight program and the technology capability mapping, the process is described for how to effectively build an integrated technology infusion plan. The process starts with a sound risk development plan and is completed with an integrated project plan, including content, schedule and cost. In reality, the available resources for this development are going to change over time, necessitating some level of iteration in the planning. However, the driving process is based on the initial risk assessment, which changes only when the overall architecture changes, enabling some level of stability in the process.
Mickleborough, Marla J S; Kelly, Michael E; Gould, Layla; Ekstrand, Chelsea; Lorentz, Eric; Ellchuk, Tasha; Babyn, Paul; Borowsky, Ron
2015-01-01
Functional magnetic resonance imaging (fMRI) is a noninvasive and reliable tool for mapping eloquent cortex in patients prior to brain surgery. Ensuring intact perceptual and cognitive processing is a key goal for neurosurgeons, and recent research has indicated the value of including attentional network processing in pre-surgical fMRI in order to help preserve such abilities, including reading, after surgery. We report a 42-year-old patient with a large cavernous malformation, near the left basal ganglia. The lesion measured 3.8 × 1.7 × 1.8 cm. In consultation with the patient and the multidisciplinary cerebrovascular team, the decision was made to offer the patient surgical resection. The surgical resection involved planned access via the left superior parietal lobule using stereotactic location. The patient declined an awake craniotomy; therefore, direct electrocortical stimulation (ECS) could not be used for intraoperative language localization in this case. Pre-surgical planning included fMRI localization of language, motor, sensory, and attentional processing. The key finding was that both reading and attention-processing tasks revealed consistent activation of the left superior parietal lobule, part of the attentional control network, and the site of the planned surgical access. Given this information, surgical access was adjusted to avoid interference with the attentional control network. The lesion was removed via the left inferior parietal lobule. The patient had no new neurologic deficits postoperatively but did develop mild neuropathic pain in the left hand. This case report supports recent research that indicates the value of including fMRI maps of attentional tasks along with traditional language-processing tasks in preoperative planning in patients undergoing neurosurgery procedures. © 2015 S. Karger AG, Basel.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barbee, D; McCarthy, A; Galavis, P
Purpose: Errors found during initial physics plan checks frequently require replanning and reprinting, resulting decreased departmental efficiency. Additionally, errors may be missed during physics checks, resulting in potential treatment errors or interruption. This work presents a process control created using the Eclipse Scripting API (ESAPI) enabling dosimetrists and physicists to detect potential errors in the Eclipse treatment planning system prior to performing any plan approvals or printing. Methods: Potential failure modes for five categories were generated based on available ESAPI (v11) patient object properties: Images, Contours, Plans, Beams, and Dose. An Eclipse script plugin (PlanCheck) was written in C# tomore » check errors most frequently observed clinically in each of the categories. The PlanCheck algorithms were devised to check technical aspects of plans, such as deliverability (e.g. minimum EDW MUs), in addition to ensuring that policy and procedures relating to planning were being followed. The effect on clinical workflow efficiency was measured by tracking the plan document error rate and plan revision/retirement rates in the Aria database over monthly intervals. Results: The number of potential failure modes the PlanCheck script is currently capable of checking for in the following categories: Images (6), Contours (7), Plans (8), Beams (17), and Dose (4). Prior to implementation of the PlanCheck plugin, the observed error rates in errored plan documents and revised/retired plans in the Aria database was 20% and 22%, respectively. Error rates were seen to decrease gradually over time as adoption of the script improved. Conclusion: A process control created using the Eclipse scripting API enabled plan checks to occur within the planning system, resulting in reduction in error rates and improved efficiency. Future work includes: initiating full FMEA for planning workflow, extending categories to include additional checks outside of ESAPI via Aria database queries, and eventual automated plan checks.« less
Chaudhury, Nupur; Kennedy, Patrick; Noyes, Philip; Maybank, Aletha
2016-01-01
In 2010, the Brooklyn Active Transportation Community Planning Initiative launched in 2 New York City neighborhoods. Over a 2-year planning period, residents participated in surveys, school and community forums, neighborhood street assessments, and activation events—activities that highlighted the need for safer streets locally. Consensus among residents and key multisectoral stakeholders, including city agencies and community-based organizations, was garnered in support of a planned expansion of bicycling infrastructure. The process of building on community assets and applying a collective impact approach yielded changes in the built environment, attracted new partners and resources, and helped to restore a sense of power among residents. PMID:26959270
DeGregory, Sarah Timmins; Chaudhury, Nupur; Kennedy, Patrick; Noyes, Philip; Maybank, Aletha
2016-04-01
In 2010, the Brooklyn Active Transportation Community Planning Initiative launched in 2 New York City neighborhoods. Over a 2-year planning period, residents participated in surveys, school and community forums, neighborhood street assessments, and activation events-activities that highlighted the need for safer streets locally. Consensus among residents and key multisectoral stakeholders, including city agencies and community-based organizations, was garnered in support of a planned expansion of bicycling infrastructure. The process of building on community assets and applying a collective impact approach yielded changes in the built environment, attracted new partners and resources, and helped to restore a sense of power among residents.
Plant operation planning and scheduling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jammar, R.J.
When properly designed, planning and scheduling can actually add millions of dollars per year to the bottom line. Planning and scheduling is a continuum of decisions starting with crude selection and ending with establishing short-term targets for crude processing and blending. It also includes maintaining optimization and operation simulation models. It is thought that conservatively, a refinery may save from $5 million to $10 million a year if it pays more attention to the processes behind proper planning and scheduling. Of course, the amount of savings can reach staggering proportions for companies now at the bottom of the Solomon Associatesmore » Inc. refinery performance ranking.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frew, Bethany; Mai, Trieu; Krishnan, Venkat
2016-12-01
In this study, we use the National Renewable Energy Laboratory's (NREL's) Regional Energy Deployment System (ReEDS) capacity expansion model to estimate utility-scale photovoltaic (UPV) deployment trends from present day through 2030. The analysis seeks to inform the U.S. Bureau of Land Management's (BLM's) planning activities related to UPV development on federal lands in Nevada as part of the Resource Management Plan (RMP) revision for the Las Vegas and Pahrump field offices. These planning activities include assessing the demand for new or expanded additional Solar Energy Zones (SEZ), per the process outlined in BLM's Western Solar Plan process.
Stakeholder Participation in Marine Spatial Plan Making Process in Lampung Province
NASA Astrophysics Data System (ADS)
Asirin; Asbi, A. M.; Pakpahan, V. H.
2018-05-01
Lampung Province has coastal areas, seas and small islands facing conflicts of interest between tourism, conservation areas for defense, environmental conservation, and the threat of unsustainable marine resource utilization. Indonesia (including Lampung Province) has committed itself to achieving the objectives of conservation and sustainable use of oceans, seas and marine resources in view of sustainable development. One of the instruments used to achieve this goal is by using marine spatial planning (MSP). The purpose of this research was to analyse the marine spatial plan making process in Lampung Province. This research also evaluated the participation process and participation level based on plan-making process criteria and the stakeholder participation ladder. This research can be useful as a recommendation in the evaluation step to improve the plan-making process in order to address conflicts of interest between various related interest groups, so that planning can be accomplished with the involvement of all relevant parties to reach consensus on how to achieve a sustainable marine environment. This research used a qualitative research method as well as a case study approach. The scope of this study was limited by the conceptual framework of marine spatial planning and the stakeholder participation ladder. The authors recommend study of the preparation of marine spatial planning in addition to a technocratic approach considering the results of the study aspects of spatial allocation and physical aspects of marine resources, while prioritizing building consensus among various interest groups related to the utilization of marine resources. Thus, it is necessary to develop technical steps to build consensus in the marine spatial plan-making process.
Seismology software: state of the practice
NASA Astrophysics Data System (ADS)
Smith, W. Spencer; Zeng, Zheng; Carette, Jacques
2018-05-01
We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.
Seismology software: state of the practice
NASA Astrophysics Data System (ADS)
Smith, W. Spencer; Zeng, Zheng; Carette, Jacques
2018-02-01
We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.
Research Library Year in Review 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knudson, Frances Lynn; Varjabedian, Kathryn Ruth; Boorman, Helen A.
2016 was a year of strategy, analysis and moving forward. We launched January with a strategic planning process. Building on the Lab’s Strategic Plan and Purpose Statement, we created a process that reached out to Lab leadership, scientists & engineers, and Research Library (RL) staff. An external consultant was engaged to help drive the process and to lead a fullday staff retreat. A survey was created and administered to staff, seeking feedback on priorities and direction. A parallel survey was created for stakeholders. Stakeholder questions began with the macro – from the external climate to Lab and division priorities –more » to the micro concerning priorities and directions for the RL. Stakeholders were personally interviewed by teams of two that included an interviewer and a scribe. These thirty-plus interviews were collated into a spreadsheet. A sociologist provided semantic analysis for the feedback, creating an impact document of the interviews. The full day retreat provided an opportunity for staff to build on their feedback as well as stakeholder feedback. A great deal of brainstorming led to categorized priorities and scenarios. The RL Compass Team, encompassing library leadership, moved the next stage of the process forward by taking retreat feedback and creating a first draft of a plan. Two more rounds of feedback with smaller staff groups as well as the Library Advisory Board led to the final plan. The core plan is included in this report.« less
Creating the future: IAIMS planning premises at the University of Washington.
Fuller, S S
1992-01-01
In September 1990, the University of Washington (UW) received a Phase I IAIMS Planning Grant from the National Library of Medicine and embarked upon a planning process involving the entire health sciences center. As a result of our relatively late entry into IAIMS planning, we have been able to learn from the experiences of other health sciences centers and to leverage our existing institutional efforts. Consequently, our progress has been rapid, and in a little over a year, we drafted a long-range plan and embarked on several related research and development projects. The hallmarks of our planning process include careful study of both the UW institutional environment and the experiences of other IAIMS institutions throughout the United States; broad, interdisciplinary participation of faculty, librarians, and administrators; an intensive educational process; a focus on people rather than technology; and, above all, leveraging of existing institutional and research projects that support our vision for the future. PMID:1326372
Organizational downsizing: a review of literature for planning and research.
Davis, Jullet A; Savage, Grant; Stewart, R Thomas
2003-01-01
The use of downsizing as management's strategic response to environmental and institutional changes is prevalent in all U.S. industries, including healthcare. The popular and research literature is inundated with reports on companies undergoing various stages of restructuring, which often include one or more staff reductions. This article provides a review of downsizing literature published from 1985 to 2002. Although the findings and conclusions of these articles are generally inconsistent, the prevailing opinion is that for downsizing to be successful, effective planning must occur long before, during, and after downsizing. Additionally, a downsizing plan should be included in the strategic management plan of all organizations, regardless of whether they plan to downsize or not. By including such a plan, the organization will be better prepared to begin the staff-reduction process should it be forced to do so in response to environmental changes. Finally, providing ample support and protection for staff is key to the organization's recovery and growth. The lessons provided in this literature review should assist healthcare managers in deciding how to plan and structure potential staff reductions.
Framework and components for effective discharge planning system: a delphi methodology
2012-01-01
Background To reduce avoidable hospital readmissions, effective discharge planning and appropriate post discharge support care are key requirements. This study is a 3-staged process to develop, pretest and pilot a framework for an effective discharge planning system in Hong Kong. This paper reports on the methodology of Delphi approach and findings of the second stage on pre-testing the framework developed so as to validate and attest to its applicability and practicability in which consensus was sought on the key components of discharge planning. Methods Delphi methodology was adopted to engage a group of experienced healthcare professionals to rate and discuss the framework and components of an effective discharge planning. The framework was consisted 36 statements under 5 major themes: initial screening, discharge planning process, coordination of discharge, implementation of discharge, and post discharge follow-up. Each statement was rated independently based on 3 aspects including clarity, validity and applicability on a 5-point Likert-scale. Statement with 75% or above of participants scoring 4–5 on all 3 aspects would be included in the discharge planning framework. For those statements not reaching 75% of consensus in any one of the aspect, it would be revised or discarded following the group discussion, and be re-rated in another round. Results A total of 24 participants participated in the consensus-building process. In round one rating, consensus was achieved in 25 out of 36 statements. Among those 11 statements not reaching consensus, the major concern was related to the “applicability” of the statements. The participants expressed a lack of manpower, skills and time in particular during weekends and long holidays in carrying out assessment and care plans within 24 h after admission. There were also timeliness and availability issue in providing transportation and necessary equipment to the patients. To make the statements more applicable, the wordings of some of the statements were revised to provide greater flexibility. Due to the lack of a statement in clarifying the role of the members of the healthcare professional team, one additional statement on the role and responsibility of the multidisciplinary team members was added. The first theme on “initial screening” was further revised to “initial screening and assessment” to better reflect the first stage of discharge planning process. After two rounds of rating process, all the 36 statements and the newly added statement reached consensus Conclusions A structured, systematic and coordinated system of hospital discharge system is required to facilitate the discharge process to ensure a smooth patient transition from the hospital to the community and improve patient health outcome in both clinical and social aspect. The findings of this paper provide a reference framework helping policymakers and hospital managers to facilitate the development of a coherent and systematized discharge planning process. Adopting a Delphi approach also demonstrates the values of the method as a pre-test (before the clinical run) of the components and requirements of a discharge planning system taking into account of the local context and system constraints, which would lead to improvements to its applicability and practicability. To confirm the applicability and practicability of this consensus framework for discharge planning system, the third stage of process of development of the discharge planning framework is to apply and pilot the framework in a hospital setting to evaluate its feasibility, applicability and impact in hospital including satisfaction from both the perspectives of staff and patients. PMID:23151173
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN... appear in Subpart—Potato Research and Promotion Plan. (b) Processor. Processor means any person who commercially processes potatoes into potato products, including, but not restricted to, frozen, dehydrated, or...
Entrepreneurial Spirit in Strategic Planning.
ERIC Educational Resources Information Center
Riggs, Donald E.
1987-01-01
Presents a model which merges the concepts of entrepreneurship with those of strategic planning to create a library management system. Each step of the process, including needs assessment and policy formation, strategy choice and implementation, and evaluation, is described in detail. (CLB)
Code of Federal Regulations, 2011 CFR
2011-01-01
... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN... appear in Subpart—Potato Research and Promotion Plan. (b) Processor. Processor means any person who commercially processes potatoes into potato products, including, but not restricted to, frozen, dehydrated, or...
Code of Federal Regulations, 2013 CFR
2013-01-01
... AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE POTATO RESEARCH AND PROMOTION PLAN... appear in Subpart—Potato Research and Promotion Plan. (b) Processor. Processor means any person who commercially processes potatoes into potato products, including, but not restricted to, frozen, dehydrated, or...
Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan
NASA Technical Reports Server (NTRS)
1988-01-01
An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.
ERIC Educational Resources Information Center
Vaughan, Jerry L., Sr.
This paper presents a discussion of strategic planning within social institutions and provides a planning agenda that focuses on modern trends, forecasts, and projections. First, the background of the strategic planning process is reviewed, and historical changes in the nature of modern technology are delineated, including a transformation in…
Research and development plan for the Slagging Pyrolysis Incinerator. [For TRU waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hedahl, T.G.; McCormack, M.D.
1979-01-01
Objective is to develop an incinerator for processing disposed transuranium waste. This R and D plan describes the R and D efforts required to begin conceptual design of the Slagging Pyrolysis Incinerator (Andco-Torrax). The program includes: incinerator, off-gas treatment, waste handling, instrumentation, immobilization analyses, migration studies, regulations, Belgium R and D test plan, Disney World test plan, and remote operation and maintenance. (DLC)
75 FR 30100 - FY 2010 Discretionary Livability Funding Opportunity: Alternatives Analysis Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
..., Alternatives Analysis Program, Office of Planning and Environment, by phone at (202) 493-0512 or by e-mail at... transportation planning process which includes: (1) An assessment of a wide range of public transportation... descriptions of the documents produced, can be found on FTA's Web site at http://www.fta.dot.gov/planning...
A Multifaceted Approach to Investigating Pre-Task Planning Effects on Paired Oral Test Performance
ERIC Educational Resources Information Center
Nitta, Ryo; Nakatsuhara, Fumiyo
2014-01-01
Despite the growing popularity of paired format speaking assessments, the effects of pre-task planning time on performance in these formats are not yet well understood. For example, some studies have revealed the benefits of planning but others have not. Using a multifaceted approach including analysis of the process of speaking performance, the…
Utah's Transition Guidelines for Students at Risk and Students with Mild/Moderate Handicaps.
ERIC Educational Resources Information Center
Utah State Board of Education, Salt Lake City.
These transition guidelines are designed to give Utah school districts direction in planning transition programs for Utah students at risk and/or students with disabilities. The guidelines present best practices in planning to assist these special needs students from school to life in their communities. The five-step process includes planning,…
Federal Student Aid (FSA) Five-Year Strategic Plan. FY 2004-2008
ERIC Educational Resources Information Center
US Department of Education, 2004
2004-01-01
The FSA Five-Year Strategic Plan is a roadmap for FY 2004-2008 that identifies five long-range strategic objectives, tactical short-term goals, and performance management initiatives. In working toward the goals outlined in the plan, FSA will address a number of key challenges, including legacy system migration, business process re-engineering,…
Parent/Educator Meetings Can Work for Your Child.
ERIC Educational Resources Information Center
Rothschild, Ilene; Bianchi, Julia
1986-01-01
Parents have a real opportunity to influence their child's education through participation in the Committee on the Handicapped process which includes referral, evaluation, Individualized Education Program (IEP) planning and review. Specific guidelines for parent participation in this process are discussed, including parent/teacher conferences,…
A public health hazard mitigation planning process.
Griffith, Jennifer M; Kay Carpender, S; Crouch, Jill Artzberger; Quiram, Barbara J
2014-01-01
The Texas A&M Health Science Center School of Rural Public Health, a member of the Training and Education Collaborative System Preparedness and Emergency Response Learning Center (TECS-PERLC), has long-standing partnerships with 2 Health Service Regions (Regions) in Texas. TECS-PERLC was contracted by these Regions to address 2 challenges identified in meeting requirements outlined by the Risk-Based Funding Project. First, within Metropolitan Statistical Areas, there is not a formal authoritative structure. Second, preexisting tools and processes did not adequately satisfy requirements to assess public health, medical, and mental health needs and link mitigation strategies to the Public Health Preparedness Capabilities, which provide guidance to prepare for, respond to, and recover from public health incidents. TECS-PERLC, with its partners, developed a framework to interpret and apply results from the Texas Public Health Risk Assessment Tool (TxPHRAT). The 3-phase community engagement-based TxPHRAT Mitigation Planning Process (Mitigation Planning Process) and associated tools facilitated the development of mitigation plans. Tools included (1) profiles interpreting TxPHRAT results and identifying, ranking, and prioritizing hazards and capability gaps; (2) a catalog of intervention strategies and activities linked to hazards and capabilities; and (3) a template to plan, evaluate, and report mitigation planning efforts. The Mitigation Planning Process provided a framework for Regions to successfully address all funding requirements. TECS-PERLC developed more than 60 profiles, cataloged and linked 195 intervention strategies, and developed a template resulting in 20 submitted mitigation plans. A public health-focused, community engagement-based mitigation planning process was developed by TECS-PERLC and successfully implemented by the Regions. The outcomes met all requirements and reinforce the effectiveness of academic practice partnerships and importance of community engagement in mitigation planning. Additional funding has been approved to expand the Mitigation Planning Process to all counties in Texas with local health departments.
Framework for Multidisciplinary Analysis, Design, and Optimization with High-Fidelity Analysis Tools
NASA Technical Reports Server (NTRS)
Orr, Stanley A.; Narducci, Robert P.
2009-01-01
A plan is presented for the development of a high fidelity multidisciplinary optimization process for rotorcraft. The plan formulates individual disciplinary design problems, identifies practical high-fidelity tools and processes that can be incorporated in an automated optimization environment, and establishes statements of the multidisciplinary design problem including objectives, constraints, design variables, and cross-disciplinary dependencies. Five key disciplinary areas are selected in the development plan. These are rotor aerodynamics, rotor structures and dynamics, fuselage aerodynamics, fuselage structures, and propulsion / drive system. Flying qualities and noise are included as ancillary areas. Consistency across engineering disciplines is maintained with a central geometry engine that supports all multidisciplinary analysis. The multidisciplinary optimization process targets the preliminary design cycle where gross elements of the helicopter have been defined. These might include number of rotors and rotor configuration (tandem, coaxial, etc.). It is at this stage that sufficient configuration information is defined to perform high-fidelity analysis. At the same time there is enough design freedom to influence a design. The rotorcraft multidisciplinary optimization tool is built and substantiated throughout its development cycle in a staged approach by incorporating disciplines sequentially.
Rise, Marit B; Steinsbekk, Aslak
2015-10-01
Governments in several countries attempt to strengthen user participation through instructing health-care organizations to implement user participation initiatives. There is, however, little knowledge on the effect on patients' experience from comprehensive plans for enhancing user participation in whole health service organizations. To investigate whether implementing a development plan intending to enhance user participation in a mental hospital had any effect on the patients' experience of user participation. A non-randomized controlled study including patients in three mental hospitals in Central Norway, one intervention hospital and two control hospitals. A development plan intended to enhance user participation was implemented in the intervention hospital as a part of a larger reorganizational process. The plan included establishment of a patient education centre and a user office, purchase of user expertise, appointment of contact professionals for next of kin and improvement of the centre's information and the professional culture. Perceptions of Care, Inpatient Treatment Alliance Scale and questions made for this study. A total of 1651 patients participated. Implementing a development plan in a mental hospital intending to enhance user participation had no significant effect on the patients' experience of user participation. The lack of effect can be due to inappropriate initiatives or challenges in implementation processes. Further research should ensure that initiatives and implementation processes are appropriate to impact the patients' experience. © 2013 John Wiley & Sons Ltd.
Finance and supply management project execution plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENNION, S.I.
As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.
R and T report: Goddard Space Flight Center
NASA Technical Reports Server (NTRS)
Soffen, Gerald A. (Editor)
1993-01-01
The 1993 Research and Technology Report for Goddard Space Flight Center is presented. Research covered areas such as (1) flight projects; (2) space sciences including cosmology, high energy, stars and galaxies, and the solar system; (3) earth sciences including process modeling, hydrology/cryology, atmospheres, biosphere, and solid earth; (4) networks, planning, and information systems including support for mission operations, data distribution, advanced software and systems engineering, and planning/scheduling; and (5) engineering and materials including spacecraft systems, material and testing, optics and photonics and robotics.
Strategic planning processes and financial performance among hospitals in Lebanon.
Saleh, Shadi; Kaissi, Amer; Semaan, Adele; Natafgi, Nabil Maher
2013-01-01
Strategic planning has been presented as a valuable management tool. However, evidence of its deployment in healthcare and its effect on organizational performance is limited in low-income and middle-income countries (LMICs). The study aimed to explore the use of strategic planning processes in Lebanese hospitals and to investigate its association with financial performance. The study comprised 79 hospitals and assessed occupancy rate (OR) and revenue-per-bed (RPB) as performance measures. The strategic planning process included six domains: having a plan, plan development, plan implementation, responsibility of planning activities, governing board involvement, and physicians' involvement. Approximately 90% of hospitals have strategic plans that are moderately developed (mean score of 4.9 on a 1-7 scale) and implemented (score of 4.8). In 46% of the hospitals, the CEO has the responsibility for the plan. The level of governing board involvement in the process is moderate to high (score of 5.1), whereas physician involvement is lower (score of 4.1). The OR and RPB amounted to respectively 70% and 59 304 among hospitals with a strategic plan as compared with 62% and 33 564 for those lacking such a plan. No statistical association between having a strategic plan and either of the two measures was detected. However, the findings revealed that among hospitals that had a strategic plan, higher implementation levels were associated with lower OR (p < 0.05). In an LMIC healthcare environment characterized by resource limitation, complexity, and political and economic volatility, flexibility rather than rigid plans allow organizations to better cope with environmental turbulence. Copyright © 2012 John Wiley & Sons, Ltd.
Reynolds, Heidi W; Atuahene, Kyeremeh; Sutherland, Elizabeth; Amenyah, Richard; Kwao, Isaiah Doe; Larbi, Emmanuel Tettey
2015-01-01
Objective Just as HIV prevention programs need to be tailored to the local epidemic, so should evaluations be country-owned and country-led to ensure use of those results in decision making and policy. The objective of this paper is to describe the process undertaken in Ghana to develop a national evaluation plan for the Ghana national strategy for key populations. Methods This was a participatory process that involved meetings between the Ghana AIDS Commission (GAC), other partners in Ghana working to prevent HIV among key populations, and MEASURE Evaluation. The process included three two-day, highly structured yet participatory meetings over the course of 12 months during which participants shared information about on-going and planned data and identified research questions and methods. Results An evaluation plan was prepared to inform stakeholders about which data collection activities need to be prioritized for funding, who would implement the study, the timing of data collection, the research question the data will help answer, and the analysis methods. The plan discusses various methods that can be used including the recommendation for the study design using multiple data sources. It has an evaluation conceptual model, proposed analyses, proposed definition of independent variables, estimated costs for filling data gaps, roles and responsibilities of stakeholders to carry out the plan, and considerations for ethics, data sharing and authorship. Conclusion The experience demonstrates that it is possible to design an evaluation responsive to national strategies and priorities with country leadership, regardless of stakeholders' experiences with evaluations. This process may be replicable elsewhere, where stakeholders want to plan and implement an evaluation of a large-scale program at the national or subnational level that is responsive to national priorities and part of a comprehensive monitoring and evaluation system. PMID:26120495
NASA Technical Reports Server (NTRS)
Johnson, David W.
1991-01-01
The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.
ERIC Educational Resources Information Center
Roth, Gene L.; And Others
1984-01-01
Four colleagues at Idaho State University describe how they used the DACUM (Developing A Curriculum) process to figure out what microcomputer competencies vocational educators need. Competencies include developing a personal plan for microcomputer competency; integrating computer-based instruction (CBI) into the vocational curriculum; planning,…
Ahluwalia, Sangeeta C; Harris, Benjamin J; Lewis, Valerie A; Colla, Carrie H
2018-06-01
To measure the extent to which accountable care organizations (ACOs) have adopted end-of-life (EOL) care planning processes and characterize those ACOs that have established processes related to EOL. This study uses data from three waves (2012-2015) of the National Survey of ACOs. Respondents were 397 ACOs participating in Medicare, Medicaid, and commercial ACO contracts. This is a cross-sectional survey study using multivariate ordered logit regression models. We measured the extent to which the ACO had adopted EOL care planning processes as well as organizational characteristics, including care management, utilization management, health informatics, and shared decision-making capabilities, palliative care, and patient-centered medical home experience. Twenty-one percent of ACOs had few or no EOL care planning processes, 60 percent had some processes, and 19.6 percent had advanced processes. ACOs with a hospital in their system (OR: 3.07; p = .01), and ACOs with advanced care management (OR: 1.43; p = .02), utilization management (OR: 1.58, p = .00), and shared decision-making capabilities (OR: 16.3, p = .000) were more likely to have EOL care planning processes than those with no hospital or few to no capabilities. There remains considerable room for today's ACOs to increase uptake of EOL care planning, possibly by leveraging existing care management, utilization management, and shared decision-making processes. © Health Research and Educational Trust.
Berge, Jerica M; Adamek, Margaret; Caspi, Caitlin; Loth, Katie A; Shanafelt, Amy; Stovitz, Steven D; Trofholz, Amanda; Grannon, Katherine Y; Nanney, Marilyn S
2017-08-01
Despite intense nationwide efforts to improve healthy eating and physical activity across the lifespan, progress has plateaued. Moreover, health inequities remain. Frameworks that integrate research, clinical practice, policy, and community resources to address weight-related behaviors are needed. Implementation and evaluation of integration efforts also remain a challenge. The purpose of this paper is to: (1) Describe the planning and development process of an integrator entity, HEAL (Healthy Eating and Activity across the Lifespan); (2) present outcomes of the HEAL development process including the HEAL vision, mission, and values statements; (3) define the planned integrator functions of HEAL; and (4) describe the ongoing evaluation of the integration process. HEAL team members used a theoretically-driven, evidence-based, systemic, twelve-month planning process to guide the development of HEAL and to lay the foundation for short- and long-term integration initiatives. Key development activities included a review of the literature and case studies, identifying guiding principles and infrastructure needs, conducting stakeholder/key informant interviews, and continuous capacity building among team members. Outcomes/deliverables of the first year of HEAL included a mission, vision, and values statements; definitions of integration and integrator functions and roles; a set of long-range plans; and an integration evaluation plan. Application of the HEAL integration model is currently underway through community solicited initiatives. Overall, HEAL aims to lead real world integrative work that coalesce across research, clinical practice, and policy with community resources to inspire a culture of health equity aimed at improving healthy eating and physical activity across the lifespan. Copyright © 2017 Elsevier Inc. All rights reserved.
Pacific Northwest National Laboratory institutional plan: FY 1996--2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-01-01
This report contains the operation and direction plan for the Pacific Northwest National Laboratory of the US Department of Energy. The topics of the plan include the laboratory mission and core competencies, the laboratory strategic plan; the laboratory initiatives in molecular sciences, microbial biotechnology, global environmental change, complex modeling of physical systems, advanced processing technology, energy technology development, and medical technologies and systems; core business areas, critical success factors, and resource projections.
Integrating Personalized and Community Services for Mobile Travel Planning and Management
NASA Astrophysics Data System (ADS)
Yu, Chien-Chih
Personalized and community services have been noted as keys to enhance and facilitate e-tourism as well as mobile applications. This paper aims at proposing an integrated service framework for combining personalized and community functions to support mobile travel planning and management. Major mobile tourism related planning and decision support functions specified include personalized profile management, information search and notification, evaluation and recommendation, do-it-yourself planning and design, community and collaboration management, auction and negotiation, transaction and payment, as well as trip tracking and quality control. A system implementation process with an example prototype is also presented for illustrating the feasibility and effectiveness of the proposed system framework, process model, and development methodology.
Commander’s Handbook for Strategic Communication and Communication Strategy
2010-06-24
designed to gather SC educators and key practitioners for thoughtful discussions on SC education and training issues. KLE is not about engaging key...operational design and early joint operation planning process to identify indicators that will enable us to detect when it is time to “reframe” the problem...integrating process across DOD, included in concept and doctrine development, strategy and plan design , execution, and assessment, and incorporated
Environmental scanning for Social Services.
Russell, S; Prince, M J
1992-10-01
This article describes the development of a process of systematic regional environmental scanning as part of strategic planning in the Ministry of Social Services (MSS) in British Columbia, over the 1987-1990 period. Social Services, a large regionalized social service organization, adopted a formal strategic planning process in early 1988. Ministry services are delivered in ten regions with widely varying characteristics. To ensure that this diversity is reflected in the planning process, it is essential that regional environmental information receive consideration. A simple format was developed and regional directors asked to consult with their staff and to scan their regions for issues that may impact the ministry over the medium term. The information obtained was presented by regional directors at a Senior Management Committee meeting and included in the ministry's annual Business Plan, a document which informs staff, contractors, stakeholders, and the community at large of the ministry's values, objectives, and operational goals. The inclusion of regional analyses adds useful information to the Plan. A second output of the planning process is the ministry budget. The systematic regional scans were found to be extremely useful to regional staff, other directors, and to the ministry executives while setting priorities.
This document is a project plan for a pilot study at the United Chrome NPL site, Corvallis, Oregon and includes the health and safety and quality assurance/quality control plans. The plan reports results of a bench-scale study of the treatment process as iieasured by the ...
John H. Cissel; Frederick J. Swanson; Gordon E. Grant; Deanna H. Olson; Gregory V. Stanley; Steven L. Garman; Linda R. Ashkenas; Matthew G. Hunter; Jane A. Kertis; James H. Mayo; Michelle D. McSwain; Sam G. Swetland; Keith A. Swindle; David O. Wallin
1998-01-01
The Augusta Creek project was initiated to establish and integrate landscape and watershed objectives into a landscape plan to guide management activities within a 7600-hectare (19,000-acre) planning area in western Oregon. Primary objectives included the maintenance of native species, ecosystem processes and structures, and long-term ecosystem productivity in a...
ERIC Educational Resources Information Center
Buskirk, E. Drannon, Jr.; Cole, Charles A.
Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…
STS/Spacelab payload utilization planning study: Executive summary
NASA Technical Reports Server (NTRS)
1976-01-01
The planning process recommended to meet the orbital flight requirements for the Space Transportation System and payload development, procurement, operations, and support leading to authorization and funding of STS and payload project activities is described. The rationale and rp primary products of STS utilization planning are summarized along with the implementation of the system. Major recommendations of the study are included.
ERIC Educational Resources Information Center
Higher Education Funding Council for England, Bristol.
This guide provides examples of good practice in strategic planning within higher education, particularly as it applies to Northern Ireland. Examples are drawn from the experiences of 13 case study universities and colleges. Sections of the report include a summary; an introduction and overview of the strategic planning process; and a discussion…
Bayridge Secondary School: A Case Study of the Planning and Implementation of Educational Change.
ERIC Educational Resources Information Center
Eastabrook, Glen; And Others
This is an account of the planning and implementation processes of a new secondary school (Bayridge Secondary School), located in a suburban area of a medium-sized city in Ontario, Canada. This report traces the planning and development of the school's goals, which included involvement of the entire school community, from 1970 through 1974. The…
Customizing for clients: developing a library liaison program from need to plan.
Tennant, M R; Butson, L C; Rezeau, M E; Tucker, P J; Boyle, M E; Clayton, G
2001-01-01
Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations.
Customizing for clients: developing a library liaison program from need to plan*
Tennant, Michele R.; Butson, Linda C.; Rezeau, Michelle E.; Tucker, Prudence J.; Boyle, Marian E.; Clayton, Greg
2001-01-01
Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven |primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations. PMID:11209807
ANALYTICAL METHOD CHECKLIST FOR VOLATILE ORGANIC COMPOUNDS BY GC/MS (HANDOUT)
The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
Building successful coalitions for promoting advance care planning.
Marchand, Lucille; Fowler, Kathryn J; Kokanovic, Obrad
2006-01-01
Advance care planning (ACP) has had few successful initiatives. This qualitative study explores the challenges and successes of an advance care planning coalition in Wisconsin called Life Planning 2000 using key informant interviews (n = 24) and grounded theory. Major themes included: commitment (the need for leadership, recruitment of key members, and funding); cohesiveness (disparate groups collaborating toward a common purpose), and outcomes (shift in paradigm from signing documents to process of advanced care planning, new-found collaborative relationships, and educational tool development). Coalitions need to define short-, intermediate-, and long-term goals that result in measurable outcomes and an evaluation process. Resources must be commensurate with goals. Strong leadership, paid staff adequate funding, and the collaboration of diverse groups working toward common goals are the basic requirements of a successful coalition.
Bevc, Christine A; Simon, Matthew C; Montoya, Tanya A; Horney, Jennifer A
2014-01-01
Numerous institutional facilitators and barriers to preparedness planning exist at the local level for vulnerable and at-risk populations. Findings of this evaluation study contribute to ongoing practice-based efforts to improve response services and address public health preparedness planning and training as they relate to vulnerable and at-risk populations. From January 2012 through June 2013, we conducted a multilevel, mixed-methods evaluation study of the North Carolina Preparedness and Emergency Response Research Center's Vulnerable & At-Risk Populations Resource Guide, an online tool to aid local health departments' (LHDs') preparedness planning efforts. We examined planning practices across multiple local, regional, and state jurisdictions utilizing user data, follow-up surveys, and secondary data. To identify potential incongruities in planning, we compared respondents' reported populations of interest with corresponding census data to determine whether or not there were differences in planning priorities. We used data collected from evaluation surveys to identify key institutional facilitators and barriers associated with planning for at-risk populations, including challenges to conducting assessments and lack of resources. Results identified both barriers within institutional culture and disconnects between planning priorities and evidence-based identification of vulnerable and at-risk populations, including variation in the planning process, partnerships, and perceptions. Our results highlight the important role of LHDs in preparedness planning and the potential implications associated with organizational and bureaucratic impediments to planning implementation. A more in-depth understanding of the relationships among public institutions and the levels of preparedness that contribute to the conditions and processes that generate vulnerability is needed.
Backward assembly planning with DFA analysis
NASA Technical Reports Server (NTRS)
Lee, Sukhan (Inventor)
1995-01-01
An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies, and analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans is presented. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc. that must occur during the assembly, and handles nonreversible as well as reversible assembly tasks through backward assembly planning. In order to increase the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.
Harrison, Donald L
2006-01-01
To assess the attitudes and perceptions of independent community pharmacy owners/managers about the comprehensiveness of strategic planning conducted for their pharmacies. Cross-sectional study. United States. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Comprehensiveness of strategic planning conducted; components used in the strategic planning process. Attitudes and perceptions of owners/managers of independent community pharmacies toward strategic planning. A total of 527 (42.1%) usable questionnaires were returned. Of the 141 (26.8%) respondents who indicated that they conduct strategic planning, most components of the process were used. However, only 78 (55.3%) of those respondents conducted a review of pharmacy systems, and only 60 (42.6%) periodically evaluated implemented strategies. Approximately 88% of the variance in comprehensiveness was accounted for by 12 variables identified as significantly associated with the comprehensiveness of strategic planning conducted by owners/managers of independent community pharmacies. These included factors such as favorable cost-benefit relationship, impact of the Medicare Modernization Act of 2003, and remaining competitive in the pharmacy marketplace. While a minority of the survey population, respondents who reported conducting strategic planning used a reasonably comprehensive process. Further, several variables were identified as significant factors associated with comprehensiveness of strategic planning conducted.
SU-F-T-99: Data Visualization From a Treatment Planning Tracking System for Radiation Oncology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cline, K; Kabat, C; Li, Y
2016-06-15
Purpose: A treatment planning process tracker database with input forms and a TV-viewable display webpage was developed and implemented in our clinic to collect time data points throughout the process. Tracking plan times is important because it directly affects the patient quality of care. Simply, the longer a patient waits after their initial simulation CT for treatment to begin, the more time the cancer has to progress. The tracker helps to drive workflow through the clinic, while the data collected can be used to understand and manage the process to find and eliminate inefficiencies. Methods: The overall process steps trackedmore » are CT-simulation, mark patient, draw normal contours, draw target volumes, create plan, and review/approve plan. Time stamps for task completion were extracted and used to generate a set of clinic metrics, among which include average time for each step in the process split apart by type of treatment, average time to completion for plans started in a given week, and individual overall completion time per plan. Results: Trends have been tracked for fourteen weeks of clinical data (196 plans). On average, drawing normal contours and target volumes is taking 2–5 times as long as creating the plan itself. This is potentially an issue because it could mean the process is taking too long initially, and it could be forcing the planning step to be done in a short amount of time. We also saw from our graphs that there appears to be no clear trend on the average amount of time per plan week-to-week. Conclusion: A tracker of this type has the potential to provide insight into how time is utilized in our clinic. By equipping our dosimetrists, radiation oncologists, and physicists with individualized metric sets, the tracker can help provide visibility and drive workflow. Funded in part by CPRIT (RP140105).« less
Backward assembly planning with DFA analysis
NASA Technical Reports Server (NTRS)
Lee, Sukhan (Inventor)
1992-01-01
An assembly planning system that operates based on a recursive decomposition of assembly into subassemblies is presented. The planning system analyzes assembly cost in terms of stability, directionality, and manipulability to guide the generation of preferred assembly plans. The planning in this system incorporates the special processes, such as cleaning, testing, labeling, etc., that must occur during the assembly. Additionally, the planning handles nonreversible, as well as reversible, assembly tasks through backward assembly planning. In order to decrease the planning efficiency, the system avoids the analysis of decompositions that do not correspond to feasible assembly tasks. This is achieved by grouping and merging those parts that can not be decomposable at the current stage of backward assembly planning due to the requirement of special processes and the constraint of interconnection feasibility. The invention includes methods of evaluating assembly cost in terms of the number of fixtures (or holding devices) and reorientations required for assembly, through the analysis of stability, directionality, and manipulability. All these factors are used in defining cost and heuristic functions for an AO* search for an optimal plan.
SU-E-T-04: 3D Dose Based Patient Compensator QA Procedure for Proton Radiotherapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zou, W; Reyhan, M; Zhang, M
2015-06-15
Purpose: In proton double-scattering radiotherapy, compensators are the essential patient specific devices to contour the distal dose distribution to the tumor target. Traditional compensator QA is limited to checking the drilled surface profiles against the plan. In our work, a compensator QA process was established that assess the entire compensator including its internal structure for patient 3D dose verification. Methods: The fabricated patient compensators were CT scanned. Through mathematical image processing and geometric transformations, the CT images of the proton compensator were combined with the patient simulation CT images into a new series of CT images, in which the imagedmore » compensator is placed at the planned location along the corresponding beam line. The new CT images were input into the Eclipse treatment planning system. The original plan was calculated to the combined CT image series without the plan compensator. The newly computed patient 3D dose from the combined patientcompensator images was verified against the original plan dose. Test plans include the compensators with defects intentionally created inside the fabricated compensators. Results: The calculated 3D dose with the combined compensator and patient CT images reflects the impact of the fabricated compensator to the patient. For the test cases in which no defects were created, the dose distributions were in agreement between our method and the corresponding original plans. For the compensator with the defects, the purposely changed material and a purposely created internal defect were successfully detected while not possible with just the traditional compensator profiles detection methods. Conclusion: We present here a 3D dose verification process to qualify the fabricated proton double-scattering compensator. Such compensator detection process assesses the patient 3D impact of the fabricated compensator surface profile as well as the compensator internal material and structure changes. This research receives funding support from CURA Medical Technologies.« less
Green, Andrew; Collins, Charles; Stefanini, Angelo; Ferrinho, Paulo; Chapman, Glyn; Hagos, Besrat; Adams, Yussuf; Omar, Mayeh
2007-01-01
This paper reports on comparative analysis of health planning and its relationship with health care reform in three countries, Eritrea, Mozambique and Zimbabwe. The research examined strategic planning in each country focusing in particular on its role in developing health sector reforms. The paper analyses the processes for strategic planning, the values that underpin the planning systems, and issues related to resources for planning processes. The resultant content of strategic plans is assessed and not seen to have driven the development of reforms; whilst each country had adopted strategic planning systems, in all three countries a more complex interplay of forces, including influences outside both the health sector and the country, had been critical forces behind the sectoral changes experienced over the previous decade. The key roles of different actors in developing the plans and reforms are also assessed. The paper concludes that a number of different conceptions of strategic planning exist and will depend on the particular context within which the health system is placed. Whilst similarities were discovered between strategic planning systems in the three countries, there are also key differences in terms of formality, timeframes, structures and degrees of inclusiveness. No clear leadership role for strategic planning in terms of health sector reforms was discovered. Planning appears in the three countries to be more operational than strategic. Copyright (c) 2006 John Wiley & Sons, Ltd.
American Historical Association Faculty Development Program: Planning and Implementation.
ERIC Educational Resources Information Center
Hoffmann, Charles
The planning and implementation processes of the Long Island Faculty Development Program are described. Originally sponsored by the American Historical Association's Faculty Development Program to improve history instruction, this project includes faculty representatives from four Long Island universities, colleges, and junior colleges. The…
Planning for Curriculum Development in Independent Study.
ERIC Educational Resources Information Center
Kleiber, Pamela B.; Zhu, Lillian
1995-01-01
The strategic planning process of the University System of Georgia Independent Study program includes assessment of undergraduate curriculum, credit equivalency, and enrollment rate; nationwide, faculty, and student surveys on technology in course delivery; and environmental scanning. Negotiation of various interests is an important part. (SK)
Programme Planning in University Continuing Education.
ERIC Educational Resources Information Center
Msimuko, Arthur K.
1980-01-01
Different approaches to program planning in the field of university continuing education are presented, including the purchase model, the doctor-patient model, and the process consultation model. The author adds another approach, the client approach, which represents the traditional relationship between the helper and the helped. (CT)
Reengineering the Project Design Process
NASA Technical Reports Server (NTRS)
Casani, E.; Metzger, R.
1994-01-01
In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.
Approach of Decision Making Based on the Analytic Hierarchy Process for Urban Landscape Management
NASA Astrophysics Data System (ADS)
Srdjevic, Zorica; Lakicevic, Milena; Srdjevic, Bojan
2013-03-01
This paper proposes a two-stage group decision making approach to urban landscape management and planning supported by the analytic hierarchy process. The proposed approach combines an application of the consensus convergence model and the weighted geometric mean method. The application of the proposed approach is shown on a real urban landscape planning problem with a park-forest in Belgrade, Serbia. Decision makers were policy makers, i.e., representatives of several key national and municipal institutions, and experts coming from different scientific fields. As a result, the most suitable management plan from the set of plans is recognized. It includes both native vegetation renewal in degraded areas of park-forest and continued maintenance of its dominant tourism function. Decision makers included in this research consider the approach to be transparent and useful for addressing landscape management tasks. The central idea of this paper can be understood in a broader sense and easily applied to other decision making problems in various scientific fields.
Approach of decision making based on the analytic hierarchy process for urban landscape management.
Srdjevic, Zorica; Lakicevic, Milena; Srdjevic, Bojan
2013-03-01
This paper proposes a two-stage group decision making approach to urban landscape management and planning supported by the analytic hierarchy process. The proposed approach combines an application of the consensus convergence model and the weighted geometric mean method. The application of the proposed approach is shown on a real urban landscape planning problem with a park-forest in Belgrade, Serbia. Decision makers were policy makers, i.e., representatives of several key national and municipal institutions, and experts coming from different scientific fields. As a result, the most suitable management plan from the set of plans is recognized. It includes both native vegetation renewal in degraded areas of park-forest and continued maintenance of its dominant tourism function. Decision makers included in this research consider the approach to be transparent and useful for addressing landscape management tasks. The central idea of this paper can be understood in a broader sense and easily applied to other decision making problems in various scientific fields.
Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability
Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.
2014-01-01
Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644
Strategic planning for organizational effectiveness during dynamic change.
Carlson, Susan L; Harris, Melodee; McLeskey, Nanci
2013-01-01
The leadership of a professional association is charged with developing a strategic plan to operationalize the organization's goals, tactics, and progress. Within the context of its values and goals, a strategic plan steers the organization toward its mission. While there are a variety of models and approaches used in strategic planning, the National Gerontological Nursing Association (NGNA) has historically used goal-based methodology. This method is congruent with the organization's leadership preferences, consistent with the mission-driven culture of the organization, and collaborative in its approach. In 2009 the NGNA Board of Directors initiated a plan for the organization's transformation to a more dynamic and member-driven association through a deliberate process. This article addresses the process used to arrive at the 2010–2011 NGNA strategic initiatives, including a discussion of pertinent data revealed in the 2011 needs assessment survey and NGNA's future initiatives focused on networking, communication, and membership benefits. This process is relevant for all organizations and groups seeking improvement in serving their constituents.
B Plant Complex preclosure work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
ADLER, J.G.
1999-02-02
This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less
Draft Plan for Characterizing Commercial Data Products in Support of Earth Science Research
NASA Technical Reports Server (NTRS)
Ryan, Robert E.; Terrie, Greg; Berglund, Judith
2006-01-01
This presentation introduces a draft plan for characterizing commercial data products for Earth science research. The general approach to the commercial product verification and validation includes focused selection of a readily available commercial remote sensing products that support Earth science research. Ongoing product verification and characterization will question whether the product meets specifications and will examine its fundamental properties, potential and limitations. Validation will encourage product evaluation for specific science research and applications. Specific commercial products included in the characterization plan include high-spatial-resolution multispectral (HSMS) imagery and LIDAR data products. Future efforts in this process will include briefing NASA headquarters and modifying plans based on feedback, increased engagement with the science community and refinement of details, coordination with commercial vendors and The Joint Agency Commercial Imagery Evaluation (JACIE) for HSMS satellite acquisitions, acquiring waveform LIDAR data and performing verification and validation.
Developing family planning nurse practitioner protocols.
Hawkins, J W; Roberto, D
1984-01-01
This article focuses on the process of development of protocols for family planning nurse practitioners. A rationale for the use of protocols, a definition of the types and examples, and the pros and cons of practice with protocols are presented. A how-to description for the development process follows, including methods and a suggested tool for critique and evaluation. The aim of the article is to assist nurse practitioners in developing protocols for their practice.
ERIC Educational Resources Information Center
Brewer, Julie; And Others
1995-01-01
Presents three articles that discuss customer service in libraries, with a focus on planning for service management, a customer service program for library staff, and a quality improvement process. Highlights include developing and implementing service strategies, dealing with requests, redefining work relationships, coworkers as customers,…
The stem cell laboratory: design, equipment, and oversight.
Wesselschmidt, Robin L; Schwartz, Philip H
2011-01-01
This chapter describes some of the major issues to be considered when setting up a laboratory for the culture of human pluripotent stem cells (hPSCs). The process of establishing a hPSC laboratory can be divided into two equally important parts. One is completely administrative and includes developing protocols, seeking approval, and establishing reporting processes and documentation. The other part of establishing a hPSC laboratory involves the physical plant and includes design, equipment and personnel. Proper planning of laboratory operations and proper design of the physical layout of the stem cell laboratory so that meets the scope of planned operations is a major undertaking, but the time spent upfront will pay long-term returns in operational efficiency and effectiveness. A well-planned, organized, and properly equipped laboratory supports research activities by increasing efficiency and reducing lost time and wasted resources.
Mission Data System Java Edition Version 7
NASA Technical Reports Server (NTRS)
Reinholtz, William K.; Wagner, David A.
2013-01-01
The Mission Data System framework defines closed-loop control system abstractions from State Analysis including interfaces for state variables, goals, estimators, and controllers that can be adapted to implement a goal-oriented control system. The framework further provides an execution environment that includes a goal scheduler, execution engine, and fault monitor that support the expression of goal network activity plans. Using these frameworks, adapters can build a goal-oriented control system where activity coordination is verified before execution begins (plan time), and continually during execution. Plan failures including violations of safety constraints expressed in the plan can be handled through automatic re-planning. This version optimizes a number of key interfaces and features to minimize dependencies, performance overhead, and improve reliability. Fault diagnosis and real-time projection capabilities are incorporated. This version enhances earlier versions primarily through optimizations and quality improvements that raise the technology readiness level. Goals explicitly constrain system states over explicit time intervals to eliminate ambiguity about intent, as compared to command-oriented control that only implies persistent intent until another command is sent. A goal network scheduling and verification process ensures that all goals in the plan are achievable before starting execution. Goal failures at runtime can be detected (including predicted failures) and handled by adapted response logic. Responses can include plan repairs (try an alternate tactic to achieve the same goal), goal shedding, ignoring the fault, cancelling the plan, or safing the system.
Direct heat geothermal opportunities at Pahoa, Hawaii
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moreau, J.; Jones, W.L.
1980-09-01
A geothermal commercial park located near Pahoa, Hawaii, has been found to be technically feasible. However, community acceptance varies from optimistic support for the job opportunities to only lukewarm acceptance by most residents of the nearby planned residential community. Interviews, team evaluations, and calculations of energy and transportation savings were used to reduce a list of candidate processes to four. These four include an ethanol plant, a cattle feed mill, a protein recovery plant, and a papaya processing facility. In addition, a research laboratory is planned for the evaluation of other processes identified as very promising.
NASA Astrophysics Data System (ADS)
Swanson, Lauren H.; Bianchini, Julie A.
2015-12-01
In this study, we investigated the process of teacher co-planning. We examined two teams of high school science and special education teachers brought together to co-plan inclusive, inquiry-oriented science units as part of a professional development effort. We used three conceptual lenses to help make sense of this process: (1) characteristics of collaboration, (2) small group interactions, and (3) community discourse. Using these lenses individually and collectively, we identified strengths and limitations in teachers' co-planning efforts. A strength was that all teachers, irrespective of discipline, shared ideas and helped make decisions about the content and activities included in unit and lesson plans. A limitation was that teachers, again irrespective of discipline, discussed science education topics in their teams more often than special education ones. We found this latter finding of note as it spoke to issues of parity among teachers during the professional development. In our discussion, we argue that each conceptual lens yielded both unique and common findings on co-planning. We also provide recommendations for professional developers and educational scholars intent on organizing and/or researching co-planning among science and special education teachers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linard, Joshua; Campbell, Sam
This event included annual sampling of groundwater and surface water locations at the Gunnison, Colorado, Processing Site. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and analysis-plan-us-department-energy-office-legacy-management-sites). Samples were collected from 28 monitoring wells, three domestic wells, and six surface locations in April at the processing site as specified in the draft 2010 Ground Water Compliance Action Plan for the Gunnison, Colorado, Processing Site. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Domestic wells 0476 and 0477 weremore » sampled in June because the homes were unoccupied in April, and the wells were not in use. Duplicate samples were collected from locations 0126, 0477, and 0780. One equipment blank was collected during this sampling event. Water levels were measured at all monitoring wells that were sampled. See Attachment 2, Trip Reports for additional details. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that requires additional action or follow-up. An assessment of anomalous data is included in Attachment 3. Interpretation and presentation of results, including an assessment ofthe natural flushing compliance strategy, will be reported in the upcoming 2016 Verification Monitoring Report. U.S.« less
Research on the Intensity Analysis and Result Visualization of Construction Land in Urban Planning
NASA Astrophysics Data System (ADS)
Cui, J.; Dong, B.; Li, J.; Li, L.
2017-09-01
As a fundamental work of urban planning, the intensity analysis of construction land involves many repetitive data processing works that are prone to cause errors or data precision loss, and the lack of efficient methods and tools to visualizing the analysis results in current urban planning. In the research a portable tool is developed by using the Model Builder technique embedded in ArcGIS to provide automatic data processing and rapid result visualization for the works. A series of basic modules provided by ArcGIS are linked together to shape a whole data processing chain in the tool. Once the required data is imported, the analysis results and related maps and graphs including the intensity values and zoning map, the skyline analysis map etc. are produced automatically. Finally the tool is installation-free and can be dispatched quickly between planning teams.
33 CFR 385.12 - Pilot projects.
Code of Federal Regulations, 2013 CFR
2013-07-01
... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated...-Federal sponsor shall develop a Project Management Plan as described in § 385.24. (c) Project...
The Transformation of a College.
ERIC Educational Resources Information Center
Wisniewski, Richard
1996-01-01
Describes the restructuring process at the University of Tennessee, Knoxville, focusing on changes in the College of Education over four years. Grant monies allowed faculty members to attend programs and conferences, hire specialists, develop a planning document, implement a plan that included 11 new units, and elect unit leaders. (SM)
33 CFR 385.19 - Environmental and economic equity.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...
33 CFR 385.19 - Environmental and economic equity.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...
33 CFR 385.19 - Environmental and economic equity.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...
33 CFR 385.19 - Environmental and economic equity.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...
33 CFR 385.19 - Environmental and economic equity.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...
Wake County Public School System Design Guidelines.
ERIC Educational Resources Information Center
Wake County Public School System, Raleigh, NC.
The Wake County Public School System has published its guidelines for planning and design of functional, cost effective, and durable educational facilities that are attractive and enhance the students' educational experience. The guidelines present basic planning requirement and design criteria for the entire construction process, including: codes…
Resident career planning needs in internal medicine: a qualitative assessment.
Garcia, Rina L; Windish, Donna M; Rosenbaum, Julie R
2010-12-01
Few residency programs have centralized resources for career planning. As a consequence, little is known about residents' informational needs regarding career planning. To examine career preparation stressors, practical needs, and information that residents wished they were privy to when applying. In 2007 and 2008, we surveyed 163 recent graduates or graduating residents from 10 Yale-based and Yale-affiliated hospitals' internal medicine programs regarding their experiences with applying for positions after residency. We included questions about demographics, mentorship, stress of finding a job or fellowship, and open-ended questions to assess barriers and frustrations. Qualitative data were coded independently and a classification scheme was negotiated by consensus. A total of 89 residents or recent graduates responded, and 75% of them found career planning during residency training at least somewhat stressful. Themes regarding the application process included (1) knowledge about the process, (2) knowledge about career paths and opportunities, (3) time factors, (4) importance of adequate personal guidance and mentorship, and (5) self-knowledge regarding priorities and the desired outcome. Residents identified the following advice as most important: (1) start the process as early as possible and with a clear knowledge of the process timeline, (2) be clear about personal goals and priorities, and (3) be well-informed about a prospective employer and what that employer is looking for. Most residents felt career planning should be structured into the curriculum and should occur in the first year or throughout residency. This study highlights residents' desire for structured dissemination of information and counseling with regard to career planning during residency. Our data suggest that exposure to such resources may be beneficial as early as the first year of training.
Resident Career Planning Needs in Internal Medicine: A Qualitative Assessment
Garcia, Rina L.; Windish, Donna M.; Rosenbaum, Julie R.
2010-01-01
Background Few residency programs have centralized resources for career planning. As a consequence, little is known about residents' informational needs regarding career planning. Objective To examine career preparation stressors, practical needs, and information that residents wished they were privy to when applying. Methods In 2007 and 2008, we surveyed 163 recent graduates or graduating residents from 10 Yale-based and Yale-affiliated hospitals' internal medicine programs regarding their experiences with applying for positions after residency. We included questions about demographics, mentorship, stress of finding a job or fellowship, and open-ended questions to assess barriers and frustrations. Qualitative data were coded independently and a classification scheme was negotiated by consensus. Results A total of 89 residents or recent graduates responded, and 75% of them found career planning during residency training at least somewhat stressful. Themes regarding the application process included (1) knowledge about the process, (2) knowledge about career paths and opportunities, (3) time factors, (4) importance of adequate personal guidance and mentorship, and (5) self-knowledge regarding priorities and the desired outcome. Residents identified the following advice as most important: (1) start the process as early as possible and with a clear knowledge of the process timeline, (2) be clear about personal goals and priorities, and (3) be well-informed about a prospective employer and what that employer is looking for. Most residents felt career planning should be structured into the curriculum and should occur in the first year or throughout residency. Conclusions This study highlights residents' desire for structured dissemination of information and counseling with regard to career planning during residency. Our data suggest that exposure to such resources may be beneficial as early as the first year of training. PMID:22132271
Mazor, Tessa; Possingham, Hugh P.; Edelist, Dori; Brokovich, Eran; Kark, Salit
2014-01-01
Successful implementation of marine conservation plans is largely inhibited by inadequate consideration of the broader social and economic context within which conservation operates. Marine waters and their biodiversity are shared by a host of stakeholders, such as commercial fishers, recreational users and offshore developers. Hence, to improve implementation success of conservation plans, we must incorporate other marine activities while explicitly examining trade-offs that may be required. In this study, we test how the inclusion of multiple marine activities can shape conservation plans. We used the entire Mediterranean territorial waters of Israel as a case study to compare four planning scenarios with increasing levels of complexity, where additional zones, threats and activities were added (e.g., commercial fisheries, hydrocarbon exploration interests, aquaculture, and shipping lanes). We applied the marine zoning decision support tool Marxan to each planning scenario and tested a) the ability of each scenario to reach biodiversity targets, b) the change in opportunity cost and c) the alteration of spatial conservation priorities. We found that by including increasing numbers of marine activities and zones in the planning process, greater compromises are required to reach conservation objectives. Complex plans with more activities incurred greater opportunity cost and did not reach biodiversity targets as easily as simplified plans with less marine activities. We discovered that including hydrocarbon data in the planning process significantly alters spatial priorities. For the territorial waters of Israel we found that in order to protect at least 10% of the range of 166 marine biodiversity features there would be a loss of ∼15% of annual commercial fishery revenue and ∼5% of prospective hydrocarbon revenue. This case study follows an illustrated framework for adopting a transparent systematic process to balance biodiversity goals and economic considerations within a country's territorial waters. PMID:25102177
Patterson, Tamatha A.; Grundel, Ralph
2014-01-01
Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.
TH-CD-209-01: A Greedy Reassignment Algorithm for the PBS Minimum Monitor Unit Constraint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lin, Y; Kooy, H; Craft, D
2016-06-15
Purpose: To investigate a Greedy Reassignment algorithm in order to mitigate the effects of low weight spots in proton pencil beam scanning (PBS) treatment plans. Methods: To convert a plan from the treatment planning system’s (TPS) to a deliverable plan, post processing methods can be used to adjust the spot maps to meets the minimum MU constraint. Existing methods include: deleting low weight spots (Cut method), or rounding spots with weight above/below half the limit up/down to the limit/zero (Round method). An alternative method called Greedy Reassignment was developed in this work in which the lowest weight spot in themore » field was removed and its weight reassigned equally among its nearest neighbors. The process was repeated with the next lowest weight spot until all spots in the field were above the MU constraint. The algorithm performance was evaluated using plans collected from 190 patients (496 fields) treated at our facility. The evaluation criteria were the γ-index pass rate comparing the pre-processed and post-processed dose distributions. A planning metric was further developed to predict the impact of post-processing on treatment plans for various treatment planning, machine, and dose tolerance parameters. Results: For fields with a gamma pass rate of 90±1%, the metric has a standard deviation equal to 18% of the centroid value. This showed that the metric and γ-index pass rate are correlated for the Greedy Reassignment algorithm. Using a 3rd order polynomial fit to the data, the Greedy Reassignment method had 1.8 times better metric at 90% pass rate compared to other post-processing methods. Conclusion: We showed that the Greedy Reassignment method yields deliverable plans that are closest to the optimized-without-MU-constraint plan from the TPS. The metric developed in this work could help design the minimum MU threshold with the goal of keeping the γ-index pass rate above an acceptable value.« less
The application of Markov decision process with penalty function in restaurant delivery robot
NASA Astrophysics Data System (ADS)
Wang, Yong; Hu, Zhen; Wang, Ying
2017-05-01
As the restaurant delivery robot is often in a dynamic and complex environment, including the chairs inadvertently moved to the channel and customers coming and going. The traditional Markov decision process path planning algorithm is not save, the robot is very close to the table and chairs. To solve this problem, this paper proposes the Markov Decision Process with a penalty term called MDPPT path planning algorithm according to the traditional Markov decision process (MDP). For MDP, if the restaurant delivery robot bumps into an obstacle, the reward it receives is part of the current status reward. For the MDPPT, the reward it receives not only the part of the current status but also a negative constant term. Simulation results show that the MDPPT algorithm can plan a more secure path.
Designing cost effective water demand management programs in Australia.
White, S B; Fane, S A
2002-01-01
This paper describes recent experience with integrated resource planning (IRP) and the application of least cost planning (LCP) for the evaluation of demand management strategies in urban water. Two Australian case studies, Sydney and Northern New South Wales (NSW) are used in illustration. LCP can determine the most cost effective means of providing water services or alternatively the cheapest forms of water conservation. LCP contrasts to a traditional approach of evaluation which looks only at means of increasing supply. Detailed investigation of water usage, known as end-use analysis, is required for LCP. End-use analysis allows both rigorous demand forecasting, and the development and evaluation of conservation strategies. Strategies include education campaigns, increasing water use efficiency and promoting wastewater reuse or rainwater tanks. The optimal mix of conservation strategies and conventional capacity expansion is identified based on levelised unit cost. IRP uses LCP in the iterative process, evaluating and assessing options, investing in selected options, measuring the results, and then re-evaluating options. Key to this process is the design of cost effective demand management programs. IRP however includes a range of parameters beyond least economic cost in the planning process and program designs, including uncertainty, benefit partitioning and implementation considerations.
Social marketing campaign promoting the use of respiratory protection devices among farmers.
Pounds, Lea; Duysen, Ellen; Romberger, Debra; Cramer, Mary E; Wendl, Mary; Rautiainen, Risto
2014-01-01
This article describes the formal use of marketing concepts in a systematic approach to influence farmers to voluntarily increase respiratory protective device (RPD) use. The planning process for the project incorporated six key decision or action points, each informed by formative research or health behavior theory. The planning process included developing behavior change strategies based on a 4P model (product, price, place, and promotion). The resulting campaign elements included print and e-mail messages that leveraged motivators related to family and health in order to increase farmers' knowledge about the risks of exposure to dusty environments, four instructional videos related to the primary barriers identified in using RPDs, and a brightly colored storage bag to address barriers to using RPDs related to mask storage. Campaign implementation included a series of e-mails using a bulk e-mail subscription service, use of social media in the form of posting instructional videos on a YouTube channel, and in-person interactions with members of the target audience at farm shows throughout the Central States Center for Agricultural Safety and Health seven-state region. Evaluation of the e-mail campaigns indicated increased knowledge about RPD use and intent to use RPDs in dusty conditions. YouTube analytic data indicated continuing exposure of the instructional videos beyond the life of the campaign. The project demonstrates the efficacy of a planning process that incorporates formative research and clear decision points throughout. This process could be used to plan health behavior change interventions to address other agriculture-related health and safety issues.
Implementation of the EU Noise Directive in Process of Urban Planning in Poland
NASA Astrophysics Data System (ADS)
Kwiecień, J.; Szopińska, K.
2013-05-01
In Poland spatial planning policies are described by a system of planning documents controlled by act of Spatial Planning and Land Development of 27 March 2003. Sustainable development principle and spatial order form is the basis of spatial planning efforts. In the territory of Poland the manner of urban space management is defined by a planning document called Local Land Use Plan (LLUP). In a LLUP some issues are arranged, such as the purpose of a given area, location of public purpose investments, land development conditions. When analysing the development process of Polish cities, an obvious conclusion emerges about the lack of complex studies and researches of the environment concerning the issue of acoustic climate. The procedures of development of an LLUP involve merely a general diagnosis of an environment excluding measured values of pollution, including noise levels. The main aim of this article is to introduce the influence of acoustic climate on the urban space planning in Poland through the implementation of the provisions of Directive 2002/49/WE of the European Parliament and the Council of Europe from 25 June 2002. Moreover, in the stages of an LLUP implementations have been suggested the use of a Strategic Noise Map, being a tool for assisting the process of environmental noise level assessment in Poland.
Mitchell, Sarah; Dale, Jeremy
2015-04-01
The majority of children and young people who die in the United Kingdom have pre-existing life-limiting illness. Currently, most such deaths occur in hospital, most frequently within the intensive care environment. To explore the experiences of senior medical and nursing staff regarding the challenges associated with Advance Care Planning in relation to children and young people with life-limiting illnesses in the Paediatric Intensive Care Unit environment and opportunities for improvement. Qualitative one-to-one, semi-structured interviews were conducted with Paediatric Intensive Care Unit consultants and senior nurses, to gain rich, contextual data. Thematic content analysis was carried out. UK tertiary referral centre Paediatric Intensive Care Unit. Eight Paediatric Intensive Care Unit consultants and six senior nurses participated. Four main themes emerged: recognition of an illness as 'life-limiting'; Advance Care Planning as a multi-disciplinary, structured process; the value of Advance Care Planning and adverse consequences of inadequate Advance Care Planning. Potential benefits of Advance Care Planning include providing the opportunity to make decisions regarding end-of-life care in a timely fashion and in partnership with patients, where possible, and their families. Barriers to the process include the recognition of the life-limiting nature of an illness and gaining consensus of medical opinion. Organisational improvements towards earlier recognition of life-limiting illness and subsequent Advance Care Planning were recommended, including education and training, as well as the need for wider societal debate. Advance Care Planning for children and young people with life-limiting conditions has the potential to improve care for patients and their families, providing the opportunity to make decisions based on clear information at an appropriate time, and avoid potentially harmful intensive clinical interventions at the end of life. © The Author(s) 2015.
The Building Wellness project: a case history of partnership, power sharing, and compromise.
Jones, Drew; Franklin, Charla; Butler, Brittany T; Williams, Pluscedia; Wells, Kenneth B; Rodríguez, Michael A
2006-01-01
The Institute of Medicine has recommended development of community-focused strategies to alleviate the disproportionate burden of illness on minorities, including depression. So far, limited data exist on the process of developing such partnerships within diverse racial/ethnic environments as they strive to develop community-driven, evidence-based action plans to improve the quality of outreach services. We describe such an effort around depression in south Los Angeles and explore the issues of the process in the hopes of informing future partnership development. Community meetings, presentations, feedback, discussion groups, and consensus-based action items were implemented over an 18-month period. A writing subcommittee was designated to develop a description of the group's work and process, as well as the diverse perspectives in the partnership. Data sources included meeting minutes, materials for members and community feedback presentations, scribe notes, and the reflections of the authors. Development was seen on the formal group level, in the process, and on the realization of three categories of action plans. Designed to assist social service caseworkers in the recognition of and referral for depression, the action plans included developing a website, a tool kit (modified Delphi process), and a one-page depression "fact sheet" with region-specific referrals. Through the process of developing a means to combat depression in a racially/ ethnically diverse population, the community is not only better informed about depression but has become a true partner with the academic element in adapting these programs for local service providers, resulting in improved understanding of the partnership process.
Brooks, Helen L; Lovell, Karina; Bee, Penny; Sanders, Caroline; Rogers, Anne
2018-06-01
It has been established that mental health-care planning does not adequately respond to the needs of those accessing services. Understanding the reasons for this and identifying whose needs care plans serve requires an exploration of the perspectives of service users, carers and professionals within the wider organizational context. To explore the current operationalization of care planning and perceptions of its function within mental health services from the perspectives of multiple stakeholders. Participants included 21 mental health professionals, 29 service users and 4 carers from seven Mental Health Trusts in England. All participants had experience of care planning processes within secondary mental health-care services. Fifty-four semi-structured interviews were conducted with participants and analysed utilizing a qualitative framework approach. Care plans and care planning were characterized by a failure to meet the complexity of mental health needs, and care planning processes were seen to prioritize organizational agendas and risk prevention which distanced care planning from the everyday lives of service users. Care planning is recognized, embedded and well established in the practices of mental health professionals and service users. However, it is considered too superficial and mainly irrelevant to users for managing mental health in their everyday lives. Those responsible for the planning and delivery of mental health services should consider ways to increase the relevance of care planning to the everyday lives of service users including separating risk from holistic needs assessment, using support aids and utilizing a peer workforce in this regard. © 2017 The Authors Health Expectations published by John Wiley & Sons Ltd.
Automation--planning to implementation; the problems en route.
Pizer, I H
1976-01-01
Once the major decision to automate library processes is made, there are a variety of problems which may be encountered before the planned system becomes operational. These include problems of personnel, budget, procurement of adjunct services, institutional priorities, and manufacturing uncertainties. Actual and potential difficulties are discussed. PMID:1247703
Code of Federal Regulations, 2010 CFR
2010-04-01
... HACCP principles to fish and fishery product processing at least equivalent to that received under... standardized curriculum. (a) Developing a HACCP plan, which could include adapting a model or generic-type HACCP plan, that is appropriate for a specific processor, in order to meet the requirements of § 123.6(b...
Using the Big6[TM] To Plan Instruction and Services.
ERIC Educational Resources Information Center
Kearns, Jodi L.
2000-01-01
Explains how the relationship between school library collection development, curriculum development, and information problem solving can be improved by applying the Big6 Skills process to the selection of materials and teacher collaboration. Includes charts for cooperative planning that follow the Big6 Skills. (Contains 3 references.) (LRW)
76 FR 78691 - Notice of Public Meeting; Wyoming Resource Advisory Council
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-19
... agenda topics include an overview of the BLM's planning process, the Casper Resource Management Plan, a... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWY910000 L16100000 XX0000] Notice of Public Meeting; Wyoming Resource Advisory Council AGENCY: Bureau of Land Management, Interior. ACTION...
Common Sense Planning for a Computer, or, What's It Worth to You?
ERIC Educational Resources Information Center
Crawford, Walt
1984-01-01
Suggests factors to be considered in planning for the purchase of a microcomputer, including budgets, benefits, costs, and decisions. Major uses of a personal computer are described--word processing, financial analysis, file and database management, programming and computer literacy, education, entertainment, and thrill of high technology. (EJS)
Comprehensive College Plan for 2002-2003.
ERIC Educational Resources Information Center
San Antonio Coll., TX.
This plan for San Antonio College (SAC) (Texas), a college of the Alamo Community College District (ACCD), offers vision and mission statements for both ACCD and SAC. In addition, it details the Institutional Effectiveness process and philosophy for SAC. The document also includes SAC strategic goals and initiatives, and unit strategic objectives,…
New Horizons Risk Communication Strategy, Planning, Implementation, and Lessons Learned
NASA Technical Reports Server (NTRS)
Dawson, Sandra A.
2006-01-01
This paper discusses the risk communication goals, strategy, planning process and product development for the New Horizons mission, including lessons from the Cassini mission that were applied in that effort, and presents lessons learned from the New Horizons effort that could be applicable to future missions.
Tailoring the Interview Process for More Effective Personnel Selection.
ERIC Educational Resources Information Center
Saville, Anthony
Structuring the initial teacher employment interview adds validity to selection and appropriately utilizes human resources. Five aspects of an effective interview program include: (1) developing a job analysis plan; (2) reviewing the applications; (3) planning for the interview; (4) the interview instrument; and (5) legal implications. An…
Local District Planning Model Guidebook.
ERIC Educational Resources Information Center
New Jersey State Dept. of Education, Trenton.
The purpose of this guidebook is to assist chief school administrators of New Jersey's schools in the development of educational objectives and plans of action. Section 1 discusses district submission procedures, including description of the procedure to be followed, basic requirements, and review and approval processes. Section 2 presents a model…
Building consensus: Legitimate hope or seductive paradox?
Stephen F. McCool; Kathleen Guthrie; Jane Kapler Smith
2000-01-01
To understand how participants in a natural resource planning situation described the nature of consensus, we interviewed scientists, agency planners and managers, and public representatives in two planning processes on the Bitterroot National Forest in west-central Montana. While most interviewees felt the agency had included affected interests and felt that the...
A CRITERION PAPER ON PARAMETERS OF EDUCATION. FINAL REVISION.
ERIC Educational Resources Information Center
MEIERHENRY, W. C.
THIS POSITION PAPER DEFINES ASPECTS OF INNOVATION IN EDUCATION. THE APPROPRIATENESS OF PLANNED CHANGE AND THE LEGITIMACY OF FUNCTION OF PLANNED CHANGE ARE DISCUSSED. PRIMARY ELEMENTS OF INNOVATION INCLUDE THE SUBSTITUTION OF ONE MATERIAL OR PROCESS FOR ANOTHER, THE RESTRUCTURING OF TEACHER ASSIGNMENTS, VALUE CHANGES WITH RESPECT TO TEACHING…
A Process Model of Principal Selection.
ERIC Educational Resources Information Center
Flanigan, J. L.; And Others
A process model to assist school district superintendents in the selection of principals is presented in this paper. Components of the process are described, which include developing an action plan, formulating an explicit job description, advertising, assessing candidates' philosophy, conducting interview analyses, evaluating response to stress,…
Neural mechanisms of planning: A computational analysis using event-related fMRI
Fincham, Jon M.; Carter, Cameron S.; van Veen, Vincent; Stenger, V. Andrew; Anderson, John R.
2002-01-01
To investigate the neural mechanisms of planning, we used a novel adaptation of the Tower of Hanoi (TOH) task and event-related functional MRI. Participants were trained in applying a specific strategy to an isomorph of the five-disk TOH task. After training, participants solved novel problems during event-related functional MRI. A computational cognitive model of the task was used to generate a reference time series representing the expected blood oxygen level-dependent response in brain areas involved in the manipulation and planning of goals. This time series was used as one term within a general linear modeling framework to identify brain areas in which the time course of activity varied as a function of goal-processing events. Two distinct time courses of activation were identified, one in which activation varied parametrically with goal-processing operations, and the other in which activation became pronounced only during goal-processing intensive trials. Regions showing the parametric relationship comprised a frontoparietal system and include right dorsolateral prefrontal cortex [Brodmann's area (BA 9)], bilateral parietal (BA 40/7), and bilateral premotor (BA 6) areas. Regions preferentially engaged only during goal-intensive processing include left inferior frontal gyrus (BA 44). The implications of these results for the current model, as well as for our understanding of the neural mechanisms of planning and functional specialization of the prefrontal cortex, are discussed. PMID:11880658
Planning for the semiconductor manufacturer of the future
NASA Technical Reports Server (NTRS)
Fargher, Hugh E.; Smith, Richard A.
1992-01-01
Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.
Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
SIMMONS, F.M.
2000-03-29
This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cellsmore » 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas.« less
CQI: using the Hoshin planning system to design an orientation process.
Platt, D; Laird, C
1995-01-01
The Hoshin planning system, developed in Japan after World War II, includes management tools intended specifically for planning new processes. There are seven tools, which can be used individually or in any combination: affinity diagrams, interrelationship digraphs, systematic diagrams, matrix diagrams, process decision program charts, arrow diagrams and prioritization matrices. The radiology department at Carson-Tahoe Hospital formed a CQI team to improve the training of front office clerks. The team quickly discovered that a new orientation program was needed and decided to use Hoshin tools to create one. Using the tools, the team identified and prioritized all relevant factors, described specific tasks needed to complete the planning process and how long each would take, anticipated problems, and assigned areas of responsibility to members of the team. Each time the team grew weary or discouraged, the clarity and organization afforded by the tools helped them feel productive and in control of the process. The team was amazed at the creative ideas they generated through this 3-month-long process. Not only did they develop and implement a new orientation program, they also cultivated a stronger sense of pride and confidence in their work and each other.
Cholesterol Levels: What You Need to Know
... of saturated fats include some meats, dairy products, chocolate, baked goods, and deep-fried and processed foods. ... trans fats that you eat. Examples include the Therapeutic Lifestyle Changes diet and the DASH Eating Plan. ...
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Accola, Anne L.; Keith, Bryant
1989-01-01
The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.
Reasons parents buy prepackaged, processed meals: It is more complicated than “I don’t have time”
Horning, Melissa L.; Fulkerson, Jayne A.; Friend, Sarah E.; Story, Mary
2016-01-01
Objective To investigate reasons parents purchase prepackaged, processed meals and associations with parental cooking self-efficacy, meal-planning ability, and home food availability. Method This secondary data analysis uses HOME Plus study data from parents of 8–12 year old children (n=160). Associations between reasons parents purchase prepackaged, processed meals and the outcomes were assessed with Chi-square, Fisher’s exact, and t-tests. Results The most frequently endorsed reasons for purchasing prepackaged, processed meals included lack of time (57%) and family preferences (49%). Five of 6 reasons were associated with lower parental cooking self-efficacy and meal planning ability, some reasons were associated with less-healthful home food environments, and few reasons varied by sociodemographic characteristics. Conclusions and Implications Given lower cooking self-efficacy and meal-planning ability are associated with most reasons reported for purchasing prepackaged, processed meals, strategies to increase these attributes for parents of all backgrounds may reduce reliance on prepackaged processed meals for family mealtimes. PMID:27743860
Redefining and expanding quality assurance.
Robins, J L
1992-12-01
To meet the current standards of excellence necessary for blood establishments, we have learned from industry that a movement toward organization-wide quality assurance/total quality management must be made. Everyone in the organization must accept responsibility for participating in providing the highest quality products and services. Quality must be built into processes and design systems to support these quality processes. Quality assurance has been redefined to include a quality planning function described as the most effective way of designing quality into processes. A formalized quality planning process must be part of quality assurance. Continuous quality improvement has been identified as the strategy every blood establishment must support while striving for error-free processing as the long-term objective. The auditing process has been realigned to support and facilitate this same objective. Implementing organization-wide quality assurance/total quality management is one proven plan for guaranteeing the quality of the 20 million products that are transfused into 4 million patients each year and for moving toward the new order.
Cook, David C; Nelson, Eve-Lynn; Ast, Cori; Lillis, Teresa
2013-05-01
A growing number of academic health centers (AHCs) are considering approaches to expand collaboration with their communities in order to address complex and multisystem health concerns. In 2010, internal leaders at the University of Kansas Medical Center undertook a strategic planning process to enhance both community engagement activities and the scholarship resulting from these engagement activities. The authors describe the strategic planning process, recommendations, and actions associated with elevating community engagement within the AHC's mission and priorities. The strategic planning process included conducting an inventory of community engagement activities within the AHC; analyzing strengths, weaknesses, opportunities, and threats for community engagement work; and identifying goals and strategies to improve future community engagement activities and scholarship. The resulting road map for enhancing community engagement at their institution through 2015 consists of four main strategies: emphasize scholarship in community engagement, revise organizational structures to better facilitate community engagement, prioritize current engagement activities to ensure appropriate use of resources, and enhance communication of engagement initiatives to further develop stakeholder relationships.The authors also discuss implementation of the plan to date and highlight lessons learned that may inform other AHCs as they enhance and expand similar endeavors.
Hofflander, Malin; Nilsson, Lina; Eriksén, Sara; Borg, Christel
2016-03-01
This article describes healthcare managers' experiences of leading the implementation of video conferencing in discharge planning sessions as a new tool in everyday practice. Data collection took place through individual interviews and the interviews were analyzed using qualitative content analysis with an inductive approach. The results indicate that managers identified two distinct leadership perspectives when they reflected on the implementation process. They described a desired way of leading the implementation and communicating about the upcoming change, understanding and securing support for decisions, as well as ensuring that sufficient time is available throughout the change process. They also, however, described how they perceived that the implementation process was actually taking place, highlighting the lack of planning and preparation as well as the need for support and to be supportive, and having the courage to adopt and lead the implementation. It is suggested that managers at all levels require more information and training in how to encourage staff to become involved in designing their everyday work and in the implementation process. Managers, too, need ongoing organizational support for good leadership throughout the implementation of video conferencing in discharge planning sessions, including planning, start-up, implementation, and evaluation.
Multigeneration data migration from legacy systems
NASA Astrophysics Data System (ADS)
Ratib, Osman M.; Liu, Brent J.; Kho, Hwa T.; Tao, Wenchao; Wang, Cun; McCoy, J. Michael
2003-05-01
The migration of image data from different generations of legacy archive systems represents a technical challenge and in incremental cost in transitions to newer generations of PACS. UCLA medical center has elected to completely replace the existing PACS infrastructure encompassing several generations of legacy systems by a new commercial system providing enterprise-wide image management and communication. One of the most challenging parts of the project was the migration of large volumes of legacy images into the new system. Planning of the migration required the development of specialized software and hardware, and included different phases of data mediation from existing databases to the new PACS database prior to the migration of the image data. The project plan included a detailed analysis of resources and cost of data migration to optimize the process and minimize the delay of a hybrid operation where the legacy systems need to remain operational. Our analysis and project planning showed that the data migration represents the most critical path in the process of PACS renewal. Careful planning and optimization of the project timeline and resources allocated is critical to minimize the financial impact and the time delays that such migrations can impose on the implementation plan.
Encoding and choice in the task span paradigm.
Reiman, Kaitlin M; Weaver, Starla M; Arrington, Catherine M
2015-03-01
Cognitive control during sequences of planned behaviors requires both plan-level processes such as generating, maintaining, and monitoring the plan, as well as task-level processes such as selecting, establishing and implementing specific task sets. The task span paradigm (Logan in J Exp Psychol Gen 133:218-236, 2004) combines two common cognitive control paradigms, task switching and working memory span, to investigate the integration of plan-level and task-level processes during control of sequential behavior. The current study expands past task span research to include measures of encoding processes and choice behavior with volitional sequence generation, using the standard task span as well as a novel voluntary task span paradigm. In two experiments, we consider how sequence complexity, defined separately for plan-level and task-level complexity, influences sequence encoding (Experiment 1), sequence choice (Experiment 2), sequence memory, and task performance of planned sequences of action. Results indicate that participants were sensitive to sequence complexity, but that different aspects of behavior are most strongly influenced by different types of complexity. Hierarchical complexity at the plan level best predicts voluntary sequence generation and memory; while switch frequency at the task level best predicts encoding of externally defined sequences and task performance. Furthermore, performance RTs were similar for externally and internally defined plans, whereas memory was improved for internally defined sequences. Finally, participants demonstrated a significant sequence choice bias in the voluntary task span. Consistent with past research on choice behavior, volitional selection of plans was markedly influenced by both the ease of memory and performance.
Presolar Grains as Tracers of Nebular Processes
NASA Technical Reports Server (NTRS)
Huss, Gary R.
2001-01-01
This grant provided two years of funding to investigate the abundances of presolar diamond, SiC, and graphite in primitive chondritic meteorites. The original proposal was for a three-year study, but two years of funding were awarded. The proposed work plan for the first year included preparation of acid residues for two meteorites and noble-gas measurements on those residues and residues of two other meteorites that had been previously prepared. The meteorites to be measured were Acfer 003, Adrar 214, RC075, and Axtell. In the second year, the plan called for measuring Renazzo and Murchison, and beginning chemical processing on another set of meteorites, including Murray, which were to be measured in the third year. All of the meteorites listed above have been measured and the results were presented in three abstracts. The project is continuing under follow-on grants and one of two planned major papers is almost ready for submission.
The Stem Cell Laboratory: Design, Equipment, and Oversight
Wesselschmidt, Robin L.; Schwartz, Philip H.
2013-01-01
This chapter describes some of the major issues to be considered when setting up a laboratory for the culture of human pluripotent stem cells (hPSCs). The process of establishing a hPSC laboratory can be divided into two equally important parts. One is completely administrative and includes developing protocols, seeking approval, and establishing reporting processes and documentation. The other part of establishing a hPSC laboratory involves the physical plant and includes design, equipment and personnel. Proper planning of laboratory operations and proper design of the physical layout of the stem cell laboratory so that meets the scope of planned operations is a major undertaking, but the time spent upfront will pay long-term returns in operational efficiency and effectiveness. A well-planned, organized, and properly equipped laboratory supports research activities by increasing efficiency and reducing lost time and wasted resources. PMID:21822863
Zhang, Yichuan; Wang, Jiangping
2015-07-01
Rivers serve as a highly valued component in ecosystem and urban infrastructures. River planning should follow basic principles of maintaining or reconstructing the natural landscape and ecological functions of rivers. Optimization of planning scheme is a prerequisite for successful construction of urban rivers. Therefore, relevant studies on optimization of scheme for natural ecology planning of rivers is crucial. In the present study, four planning schemes for Zhaodingpal River in Xinxiang City, Henan Province were included as the objects for optimization. Fourteen factors that influenced the natural ecology planning of urban rivers were selected from five aspects so as to establish the ANP model. The data processing was done using Super Decisions software. The results showed that important degree of scheme 3 was highest. A scientific, reasonable and accurate evaluation of schemes could be made by ANP method on natural ecology planning of urban rivers. This method could be used to provide references for sustainable development and construction of urban rivers. ANP method is also suitable for optimization of schemes for urban green space planning and design.
Succession planning: a call to action for nurse executives.
Trepanier, Sylvain; Crenshaw, Jeannette T
2013-10-01
To discuss the organisational benefits of strategic succession planning in acute care hospital settings as a responsibility of chief nurse executives. A formal succession planning process is crucial to the financial and operational viability and sustainability of acute care hospitals. A succession plan is an essential business strategy that promotes effective leadership transition and continuity while maintaining productivity. Nursing and business literature were reviewed; reports contrasting institutions with and without succession plans were examined; and, operational implications were considered. It is imperative that chief nurse executives respond to the business benefits of an effective succession planning programme, identify common barriers and solutions, and implement best practices for a successful strategic succession planning programme. A strategic succession planning programme may offer many benefits to an acute care hospital, including improved retention rates, increased staff engagement and enhanced financial performance. Considering the ageing nursing workforce and the potential increase in demand for nursing services in the near future, nurse executives and other nurse leaders must actively engage in a formal succession planning process. A formal succession planning programme will help to provide strategic leadership continuity, operational effectiveness and improved quality of care. © 2013 John Wiley & Sons Ltd.
Kozar, Mark D.; Kahle, Sue C.
2013-01-01
This report documents the standard procedures, policies, and field methods used by the U.S. Geological Survey’s (USGS) Washington Water Science Center staff for activities related to the collection, processing, analysis, storage, and publication of groundwater data. This groundwater quality-assurance plan changes through time to accommodate new methods and requirements developed by the Washington Water Science Center and the USGS Office of Groundwater. The plan is based largely on requirements and guidelines provided by the USGS Office of Groundwater, or the USGS Water Mission Area. Regular updates to this plan represent an integral part of the quality-assurance process. Because numerous policy memoranda have been issued by the Office of Groundwater since the previous groundwater quality assurance plan was written, this report is a substantial revision of the previous report, supplants it, and contains significant additional policies not covered in the previous report. This updated plan includes information related to the organization and responsibilities of USGS Washington Water Science Center staff, training, safety, project proposal development, project review procedures, data collection activities, data processing activities, report review procedures, and archiving of field data and interpretative information pertaining to groundwater flow models, borehole aquifer tests, and aquifer tests. Important updates from the previous groundwater quality assurance plan include: (1) procedures for documenting and archiving of groundwater flow models; (2) revisions to procedures and policies for the creation of sites in the Groundwater Site Inventory database; (3) adoption of new water-level forms to be used within the USGS Washington Water Science Center; (4) procedures for future creation of borehole geophysics, surface geophysics, and aquifer-test archives; and (5) use of the USGS Multi Optional Network Key Entry System software for entry of routine water-level data collected as part of long-term water-level monitoring networks.
NASA Technical Reports Server (NTRS)
Russell, Yvonne; Falsetti, Christine M.
1991-01-01
Customer requirements are presented through three viewgraphs. One graph presents the range of services, which include requirements management, network engineering, operations, and applications support. Another viewgraph presents the project planning process. The third viewgraph presents the programs and/or projects actively supported including life sciences, earth science and applications, solar system exploration, shuttle flight engineering, microgravity science, space physics, and astrophysics.
Exploring Crisis Management in U.S. Small Businesses
NASA Astrophysics Data System (ADS)
Williams, Jon
As a critical infrastructure, the US electricity grid supplies electricity to 340 million people within eight separate regions. The power infrastructure is vulnerable to many types of disasters capable of severing supplies of electricity. The impact on the employees and communities when small- and medium-size enterprises are shut down due to disasters can be severe. The purpose of the quantitative comparative study was to explore small- and medium-size enterprises crisis management strategies in the case of power infrastructure vulnerabilities. Perceptions of small business leaders were probed about crisis management planning relevant to three secondary factors: prior experience of crises, threat perceptions, and planning self-efficacy. Participants completed an adapted questionnaire instrument based on a five-point Likert scale for six sub-factors including resilience through planning, financial impact, operational crisis management, the perfect storm, the aftermath of survival, and atrophy. The instrument also measured three additional factors to include, prior experience of crises, threat perceptions, and planning self-efficacy, across seven types of crises. The results of this study indicated that of the 276 respondents, 104 had no crisis plans, but 172 did have crisis plans. Of those who had implemented crisis plans, 19% had specific provisions to address power outages or attacks on the electrical grid. Of the respondents who had not planned for power outages nor experienced significant losses of power, a statistically significant number acknowledged an external threat to their business. The majority of respondents indicated that long-term planning was related to resilience; however, the migration of crisis understanding into the planning process or implementation was not implemented. This heightened awareness of potential crises without the corresponding development and implementation of mitigation crisis plans requires additional research to understand drivers effecting the decision making process with crisis managers.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... IFQ cost recovery process. This action proposes regulatory changes to Sec. 648.294(h) to reconcile the... different aspects of the cost recovery fee collection process, including Payment Responsibility, IFQ Fee... process for appealing the cost recovery fee. Under the appeals process, an IFQ allocation permit holder...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-06-01
This module includes the following: Regulatory Summary (Definitions; National Contingency Plan; Notification or Discovery; Response Process; Removal Process; Remedial Process; Community Involvement; State Role; Natural Resource Damage Assessments; Federal Facility Response; and Contractor Support); and Module Summary.
The Mission Operations Planning Assistant
NASA Technical Reports Server (NTRS)
Schuetzle, James G.
1987-01-01
The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.
The mission operations planning assistant
NASA Technical Reports Server (NTRS)
Schuetzle, James G.
1987-01-01
The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Prinicpal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZETALISP and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.
Reducing shingle waste at a manufacturing facility: 1990 MNTAP summer intern report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Menke, D.
1990-12-31
CertainTeed manufactures roofing shingles at it`s Shakopee, MN facility. Two process coating lines, and one assembly line, produce fifteen shingle types in fifteen different colors. The wastes generated by this process were the result of planned and unplanned variations in the continuous production process. Planned variations included changes in color, while felt breaks were common unplanned variations. Five options were identified that could reduce the amount of waste generated: Using a standard procedure for recovering from felt breaks, Creating a process cushion to maintain continuous production in the event of temporary shutdowns, An automated color change process, Manufacture of amore » new product from waste material, Minor process changes to reduce the frequency of breaks.« less
Astrophysics science operations - Near-term plans and vision
NASA Technical Reports Server (NTRS)
Riegler, Guenter R.
1991-01-01
Astrophysics science operations planned by the Science Operations branch of NASA Astrophysics Division for the 1990s for the purpose of gathering spaceborne astronomical data are described. The paper describes the near-future plans of the Science Operations in the areas of the preparation of the proposal; the planning and execution of spaceborne observations; the collection, processing, and analysis data; and the dissemination of results. Also presented are concepts planned for introduction at the beginning of the 20th century, including the concepts of open communications, transparent instrument and observatory operations, a spiral requirements development method, and an automated research assistant.
MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laub, S; Dunn, M; Galbreath, G
2015-06-15
Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or greenmore » according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.« less
Nitrogen Oxides (NOx) Primary NAAQS REVIEW: Integrated ...
The NOx Integrated Review Plan is the first document generated as part of the National Ambient Air Quality Standards (NAAQS) review process. The Plan presents background information, the schedule for the review, the process to be used in conducting the review, and the key policy-relevant science issues that will guide the review. The integrated review plan also discusses the frameworks for the various assessment documents to be prepared by the EPA as part of the review, including an Integrated Science Assessment (ISA), and as warranted, a Risk/Exposure Assessment (REA), and a Policy Assessment (PA). The primary purpose of the NOx Integrated Review Plan is to highlight the key policy-relevant issues to be considered in the Review of the NO2 primary NAAQS. A draft of the integrated review plan will be the subject of an advisory review with the Clean Air Scientific Advisory Committee (CASAC) and made available to the public for review and comment.
Sulfur Dioxide (SO2) Primary NAAQS Review: Integrated ...
The SO2 Integrated Review Plan is the first document generated as part of the National Ambient Air Quality Standards (NAAQS) review process. The Plan presents background information, the schedule for the review, the process to be used in conducting the review, and the key policy-relevant science issues that will guide the review. The integrated review plan also discusses the frameworks for the various assessment documents to be prepared by the EPA as part of the review, including an Integrated Science Assessment (ISA), and as warranted, a Risk/Exposure Assessment (REA), and a Policy Assessment (PA). The primary purpose of the SO2 Integrated Review Plan is to highlight the key policy-relevant issues to be considered in the Review of the SO2 primary NAAQS. A draft of the integrated review plan will be the subject of an advisory with the Clean Air Scientific Advisory Committee (CASAC) and made available to the public for review and comment.
Andrews, M L; Sánchez, V; Carrillo, C; Allen-Ananins, B; Cruz, Y B
2014-02-01
We present the collaborative development of a web-based data collection and monitoring plan for thirty-two county councils within New Mexico's health council system. The monitoring plan, a key component in our multiyear participatory statewide evaluation process, was co-developed with the end users: representatives of the health councils. Guided by the Institute of Medicine's Community, Health Improvement Process framework, we first developed a logic model that delineated processes and intermediate systems-level outcomes in council development, planning, and community action. Through the online system, health councils reported data on intermediate outcomes, including policy changes and funds leveraged. The system captured data that were common across the health council system, yet was also flexible so that councils could report their unique accomplishments at the county level. A main benefit of the online system was that it provided the ability to assess intermediate, outcomes across the health council system. Developing the system was not without challenges, including creating processes to ensure participation across a large rural state; creating shared understanding of intermediate outcomes and indicators; and overcoming technological issues. Even through the challenges, however, the benefits of committing to using participatory processes far outweighed the challenges. Copyright © 2013 Elsevier Ltd. All rights reserved.
25 CFR 1000.66 - What must be included in the application?
Code of Federal Regulations, 2014 CFR
2014-04-01
... EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.66 What must be included in the application? The application for a...
25 CFR 1000.66 - What must be included in the application?
Code of Federal Regulations, 2013 CFR
2013-04-01
... EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.66 What must be included in the application? The application for a...
25 CFR 1000.66 - What must be included in the application?
Code of Federal Regulations, 2012 CFR
2012-04-01
... EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.66 What must be included in the application? The application for a...
25 CFR 1000.66 - What must be included in the application?
Code of Federal Regulations, 2011 CFR
2011-04-01
... EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.66 What must be included in the application? The application for a...
Pacific Northwest National Laboratory’s Climate Resiliency Planning Process and Lessons Learned
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fowler, Kimberly M.; Judd, Kathleen S.; Brandenberger, Jill M.
2016-02-22
In 2015, the Pacific Northwest National Laboratory (PNNL) developed its first Climate Resilience Plan for its Richland Campus. PNNL has performed Climate Resilience Planning for the Department of Defense, Nuclear Regulatory Commission, and Department of Energy (DOE) over the past 5 years. The assessment team included climate scientists, social scientists, engineers, and operations managers. A multi-disciplinary team was needed to understand the potential exposures to future changes at the site, the state of the science on future impacts, and the best process for “mainstreaming” new actions into existing activities. The team uncovered that the site’s greatest vulnerabilities, and therefore prioritiesmore » for climate resilience planning, are high temperature due to degraded infrastructure, increased wildfire frequency, and intense precipitation impacts on stormwater conveyance systems.« less
Technology Transfer and the Civil Space Program. Volume 2: Workshop proceedings
NASA Technical Reports Server (NTRS)
1992-01-01
The objectives were to (1) provide a top-level review of the Integrated Technology Plan (ITP) and current civil space technology plans, including planning processes and technologies; (2) discuss and assess technology transfer (TT) experiences across a wide range of participants; (3) identify alternate categories/strategies for TT and define the objectives of transfer processes in each case; (4) identify the roles of various government 'stakeholders', aerospace industry, industries at large, and universities in civil space technology research, development, demonstration, and transfer; (5) identify potential barriers and/or opportunities to successful civil space TT; (6) identify specific needs for innovations in policy, programs, and/or procedures to facilitate TT; and (7) develop a plan of attack for the development of a workshop report. Papers from the workshop are presented.
Strategic workforce planning for a multihospital, integrated delivery system.
Datz, David; Hallberg, Colleen; Harris, Kathy; Harrison, Lisa; Samples, Patience
2012-01-01
Banner Health has long recognized the need to anticipate, beyond the immediate operational realities or even the annual budgeting projection exercises, the necessary workforce needs of the future. Thus, in 2011, Banner implemented a workforce planning model that included structures, processes, and tools for predicting workforce needs, with particular focus on identified critical systemwide practice areas. The model represents the incorporation of labor management tools and processes with more strategic, broad-view, long-term assessment and planning mechanisms. The sequential tying of the workforce planning lifecycle with the organization's strategy and financial planning process supports alignment of goals, objectives, and resource allocation. Collaboration among strategy, finance, human resources, and operations has provided us with the ability to identify critical position groups based on 3-year strategic priorities. By engaging leaders from across the organization, focusing on activities at facility, regional, and system levels, and building in mechanisms for accountability, we are now engaged in continuous evaluations of our delivery models, the competencies and preparations necessary for the staff to effectively function within those delivery models, and developing and implementing action plans designed to ensure adequate numbers of the staff whose competencies will be suited to the work expected of them.
Uyeno, Jennifer; Heck, Carol S.
2014-01-01
ABSTRACT Purpose: To examine discharge planning of patients in general internal medicine units in Ontario acute-care hospitals from the perspective of physiotherapists. Methods: A cross-sectional study using an online questionnaire was sent to participants in November 2011. Respondents' demographic characteristics and ranking of factors were analyzed using descriptive statistics; t-tests were performed to determine between-group differences (based on demographic characteristics). Responses to open-ended questions were coded to identify themes. Results: Mobility status was identified as the key factor in determining discharge readiness; other factors included the availability of social support and community resources. While inter-professional communication was identified as important, processes were often informal. Discharge policies, timely availability of other discharge options, and pressure for early discharge were identified as affecting discharge planning. Respondents also noted a lack of training in discharge planning; accounts of ethical dilemmas experienced by respondents supported these themes. Conclusions: Physiotherapists consider many factors beyond the patient's physical function during the discharge planning process. The improvement of team communication and resource allocation should be considered to deal with the realities of discharge planning. PMID:25125778
Advanced imaging programs: maximizing a multislice CT investment.
Falk, Robert
2008-01-01
Advanced image processing has moved from a luxury to a necessity in the practice of medicine. A hospital's adoption of sophisticated 3D imaging entails several important steps with many factors to consider in order to be successful. Like any new hospital program, 3D post-processing should be introduced through a strategic planning process that includes administrators, physicians, and technologists to design, implement, and market a program that is scalable-one that minimizes up front costs while providing top level service. This article outlines the steps for planning, implementation, and growth of an advanced imaging program.
Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta
2016-01-01
ABSTRACT In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda’s CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda’s CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda’s CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution. PMID:27353621
Gleicher, Yehoshua; Mosko, Jeffrey David; McGhee, Irene
2017-01-01
Handovers from the cardiovascular operating room (CVOR) to the cardiovascular intensive care unit (CVICU) are complex processes involving the transfer of information, equipment and responsibility, at a time when the patient is most vulnerable. This transfer is typically variable in structure, content and execution. This variability can lead to the omission and miscommunication of critical information leading to patient harm. We set out to improve the quality of patient handover from the CVOR to the CVICU by introducing a standardised handover protocol. This study is an interventional time-series study over a 4-month period at an adult cardiac surgery centre. A standardised handover protocol was developed using quality improvement methodologies. The protocol included a handover content checklist and introduction of a formal 'sterile cockpit' timeout. Implementation of the protocol was refined using monthly iterative Plan-Do-Study-Act. The primary outcome was the quality of handovers, measured by a Handover Score, comprising handover content, teamwork and patient care planning indicators. Secondary outcomes included handover duration, adherence to the standardised handover protocol and handover team satisfaction surveys. 37 handovers were observed (6 pre intervention and 31 post intervention). The mean handover score increased from 6.5 to 14.0 (maximum 18 points). Specific improvements included fewer handover interruptions and more frequent postoperative patient care planning. Average handover duration increased slightly from 2:40 to 2:57 min. Caregivers noted improvements in teamwork, content received and patient care planning. The majority (>95%) agreed that the intervention was a valuable addition to the CVOR to CVICU handover process. Implementation of a standardised handover protocol for postcardiac surgery patients was associated with fewer interruptions during handover, more reliable transfer of critical content and improved patient care planning.
Executing on Integration: The Key to Success in Mergers and Acquisitions.
Bradley, Carol
2016-01-01
Health care mergers and acquisitions require a clearly stated vision and exquisite planning of integration activities to provide the best possible conditions for a successful transaction. During the due diligence process, key steps can be taken to create a shared vision and a plan to inspire confidence and build enthusiasm for all stakeholders. Integration planning should include a defined structure, roles and responsibilities, as well as a method for evaluation.
Computer-Generated Movies for Mission Planning
NASA Technical Reports Server (NTRS)
Roberts, P. H., Jr.; vanDillen, S. L.
1973-01-01
Computer-generated movies help the viewer to understand mission dynamics and get quantitative details. Sample movie frames demonstrate the uses and effectiveness of movies in mission planning. Tools needed for movie-making include computer programs to generate images on film and film processing to give the desired result. Planning scenes to make an effective product requires some thought and experience. Viewpoints and timing are particularly important. Lessons learned so far and problems still encountered are discussed.
NASA Technical Reports Server (NTRS)
Chien, Steve; Rabideau, Gregg; Tran, Daniel; Knight, Russell; Chouinard, Caroline; Estlin, Tara; Gaines, Daniel; Clement, Bradley; Barrett, Anthony
2007-01-01
CASPER is designed to perform automated planning of interdependent activities within a system subject to requirements, constraints, and limitations on resources. In contradistinction to the traditional concept of batch planning followed by execution, CASPER implements a concept of continuous planning and replanning in response to unanticipated changes (including failures), integrated with execution. Improvements over other, similar software that have been incorporated into CASPER version 2.0 include an enhanced executable interface to facilitate integration with a wide range of execution software systems and supporting software libraries; features to support execution while reasoning about urgency, importance, and impending deadlines; features that enable accommodation to a wide range of computing environments that include various central processing units and random- access-memory capacities; and improved generic time-server and time-control features.
Derby district redevelopment in Colorado: case study on the health impact assessment process.
Maclennan, Carol F; Ghosh, Tista S; Juliusson, Lara; Vogt, Richard L; Boehmer, Tegan K
2012-01-01
Health Impact Assessment (HIA) is a tool that is increasingly utilized in the U.S. to shape policies that may impact the public's health. Domestic examples of HIAs and the process by which they were conducted, however, are rarely documented in the peer-reviewed literature. Through an existing relationship with the planning department in Commerce City, Colorado, Tri-County Health Department (TCHD) was able to identify a proposed redevelopment plan as a candidate for an HIA. The HIA focused on potential effects of the proposed redevelopment of Commerce City's historic Derby District on residents' physical activity and nutrition-related behaviors. This article describes the HIA process used by TCHD. Several sources of data were used, including participatory community input on walkability and safety, local health behavior data, and maps of health-influencing environmental characteristics. Using a variety of information sources including community input and local health behavior data can be useful in conducting HIAs and impacting policies. Local health departments should consider cultivating ongoing collaborative partnerships with municipal planning departments and community groups to conduct HIAs and to implement recommendations.
What is the Final Verification of Engineering Requirements?
NASA Technical Reports Server (NTRS)
Poole, Eric
2010-01-01
This slide presentation reviews the process of development through the final verification of engineering requirements. The definition of the requirements is driven by basic needs, and should be reviewed by both the supplier and the customer. All involved need to agree upon a formal requirements including changes to the original requirements document. After the requirements have ben developed, the engineering team begins to design the system. The final design is reviewed by other organizations. The final operational system must satisfy the original requirements, though many verifications should be performed during the process. The verification methods that are used are test, inspection, analysis and demonstration. The plan for verification should be created once the system requirements are documented. The plan should include assurances that every requirement is formally verified, that the methods and the responsible organizations are specified, and that the plan is reviewed by all parties. The options of having the engineering team involved in all phases of the development as opposed to having some other organization continue the process once the design has been complete is discussed.
NOx SOx Secondary NAAQS: Integrated Review Plan ...
The NOx SOx Secondary NAAQS Integrated Review Plan is the first document generated as part of the National Ambient Air Quality Standards (NAAQS) review process. The Plan presents background information, the schedule for the review, the process to be used in conducting the review, and the key policy-relevant science issues that will guide the review. The integrated review plan also discusses the frameworks for the various assessment documents to be prepared by the EPA as part of the review, including an Integrated Science Assessment (ISA), and as warranted, a Risk/Exposure Assessment (REA), and a Policy Assessment (PA). The primary purpose of the NOx SOx Secondary NAAQS Integrated Review Plan is to highlight the key policy-relevant issues to be considered in the Review of the Oxides of Nitrogen and Oxides of Sulfur Secondary NAAQS. A draft of the integrated review plan will be the subject of an advisory review with the Clean Air Scientific Advisory Committee (CASAC) and made available to the public for review and comment.
A Holistic Approach to Family Planning Counseling and Education.
ERIC Educational Resources Information Center
Chaves, Lushanhya Coutinho; And Others
A family planning clinic which was part of a large public maternity hospital in Salvador Bahia, Brazil received a grant to expand its services and to evaluate a service model focusing on client counseling and education. The counseling, education, and service provision process included individual pre-consultation with a nurse, group education and…
SeaSat-A Satellite Scatterometer (SASS) Validation and Experiment Plan
NASA Technical Reports Server (NTRS)
Schroeder, L. C. (Editor)
1978-01-01
This plan was generated by the SeaSat-A satellite scatterometer experiment team to define the pre-and post-launch activities necessary to conduct sensor validation and geophysical evaluation. Details included are an instrument and experiment description/performance requirements, success criteria, constraints, mission requirements, data processing requirement and data analysis responsibilities.
A Four-Stage Model for Planning Computer-Based Instruction.
ERIC Educational Resources Information Center
Morrison, Gary R.; Ross, Steven M.
1988-01-01
Describes a flexible planning process for developing computer based instruction (CBI) in which the CBI design is implemented on paper between the lesson design and the program production. A four-stage model is explained, including (1) an initial flowchart, (2) storyboards, (3) a detailed flowchart, and (4) an evaluation. (16 references)…
Computers and Information Systems in Planning and Related Governmental Functions.
ERIC Educational Resources Information Center
Tucker, Dorothy; Vance, Mary, Ed.
The 266 items cited include material published since July 1960, organized in the following ten groups: (1) general discussion, and feasibility; (2) statewide electronic data processing (EDP) systems; (3) EDP in local governments; (4) intergovernmental EDP systems; (5) EDP in the planning agency; (6) data banks and information systems; (7) computer…
The NGST Science Instrument Procurement Plan
NASA Astrophysics Data System (ADS)
Greenhouse, M. A.; NGST Project Office Team
1998-12-01
We display the top level plan for procurement of science instruments for NGST. The procurement process and time line schedule leading to a NASA AO solicitation for flight instruments is presented and discussed. This procurement schedule includes important milestones that will be reached during 1999 and that are of potential interest to NGST instrument offerors.
Year 1 Evaluation of Nebraska's Statewide Plan: Connecting Schools to the Internet.
ERIC Educational Resources Information Center
Topp, Neal W.; Grandgenett, Neal
1996-01-01
Reviews activities in the first year of a Nebraska plan to connect K-12 schools to the Internet, including: installing UNIX-based computers; developing a statewide training program; hiring; distributing support materials; and devising a formative evaluation process. Trends in teacher and student Internet use and eight projects in classroom…
21 CFR 123.6 - Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan.
Code of Federal Regulations, 2013 CFR
2013-04-01
... identified food safety hazards, including as appropriate: (i) Critical control points designed to control... control points designed to control food safety hazards introduced outside the processing plant environment... Control Point (HACCP) plan. 123.6 Section 123.6 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF...
21 CFR 123.6 - Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan.
Code of Federal Regulations, 2011 CFR
2011-04-01
... identified food safety hazards, including as appropriate: (i) Critical control points designed to control... control points designed to control food safety hazards introduced outside the processing plant environment... Control Point (HACCP) plan. 123.6 Section 123.6 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF...
21 CFR 123.6 - Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan.
Code of Federal Regulations, 2014 CFR
2014-04-01
... identified food safety hazards, including as appropriate: (i) Critical control points designed to control... control points designed to control food safety hazards introduced outside the processing plant environment... Control Point (HACCP) plan. 123.6 Section 123.6 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF...
ERIC Educational Resources Information Center
National Education Association, Washington, DC. Project on Utilization of Inservice Education R & D Outcomes.
The workshop instructional materials described here are designed to try out a systematic problem solving process as a way of working toward improvements in the school setting. Topics include diagnosis using force field technique, small group dynamics, planning for action, and planning a RUPS (Research Using Problem Solving) project. This…
24 CFR 598.205 - What are the requirements for nomination?
Code of Federal Regulations, 2011 CFR
2011-04-01
... that the strategic plan described in § 598.215 will be implemented, and these governments submit its... strategic plan, as described in § 598.215; (3) Include the certifications described in § 598.210; (4... designation process. (Approved by the Office of Management and Budget under Control Number 2506-0148) [63 FR...
ERIC Educational Resources Information Center
Geyer, Patricia
1997-01-01
Examines the process used to develop a lesson plan from an academic research article. Includes a lesson plan developed from an article in the Spring 1997 issue of "The Journal of World History" tracing the history of jute (a substitute for flax) manufacturing in colonial India. (MJP)
2016-03-13
dynamics of percept formation modeled as operant (selectionist) process, Cognitive Neurodynamics , (08 2013): 0. doi: 10.1007/s11571-013-9262-0 Jun Zhang... cognitive principles for categorization. Our execution plan include three specific topics (“Aims”) 1. REPORT DATE (DD-MM-YYYY) 4. TITLE AND SUBTITLE 13...while rooted in human cognitive principles for categorization. Our execution plan include three specific topics (“Aims”) 1. Apply RKBS theory to
Nonword Repetition in Children and Adults: Effects on Movement Coordination
ERIC Educational Resources Information Center
Sasisekaran, Jayanthi; Smith, Anne; Sadagopan, Neeraja; Weber-Fox, Christine
2010-01-01
Hearing and repeating novel phonetic sequences, or novel nonwords, is a task that taps many levels of processing, including auditory decoding, phonological processing, working memory, speech motor planning and execution. Investigations of nonword repetition abilities have been framed within models of psycholinguistic processing, while the motor…
National and State Writing Tests: The Writing Process Betrayed
ERIC Educational Resources Information Center
Schuster, Edgar H.
2004-01-01
State academic standards broadly support the writing process, including the planning (prewriting), drafting, revising, editing, and publishing (sharing) stages. There is also widespread recognition that a valuable part of the process is conferencing, either between teacher and student, student and student (often referred to as peer feedback), or…
NPTool: Towards Scalability and Reliability of Business Process Management
NASA Astrophysics Data System (ADS)
Braghetto, Kelly Rosa; Ferreira, João Eduardo; Pu, Calton
Currently one important challenge in business process management is provide at the same time scalability and reliability of business process executions. This difficulty becomes more accentuated when the execution control assumes complex countless business processes. This work presents NavigationPlanTool (NPTool), a tool to control the execution of business processes. NPTool is supported by Navigation Plan Definition Language (NPDL), a language for business processes specification that uses process algebra as formal foundation. NPTool implements the NPDL language as a SQL extension. The main contribution of this paper is a description of the NPTool showing how the process algebra features combined with a relational database model can be used to provide a scalable and reliable control in the execution of business processes. The next steps of NPTool include reuse of control-flow patterns and support to data flow management.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-05
...This Request for Information (RFI) notice informs the public that the Department of Homeland Security's (DHS) Science and Technology Directorate (S&T) is currently developing a National Critical Infrastructure Security and Resilience Research and Development Plan (NCISR R&D Plan) to conform to the requirements of Presidential Policy Directive 21, Critical Infrastructure Security and Resilience. As part of a comprehensive national review process, DHS solicits public comment on issues or language in the NCISR R&D Plan that need to be included. Critical infrastructure includes both cyber and physical components, systems, and networks for the sixteen established ``critical infrastructures''.
Guidance on including ITS elements in transportation projects
DOT National Transportation Integrated Search
2001-01-01
The purpose of this document is to provide guidance for including ITS equipment and technologies as part of traditional transportation construction or maintenance projects. This document is not intended to simplify the planning process, rather it is ...
Guidelines for Contracting Microfilming Services.
ERIC Educational Resources Information Center
Byrne, Sherry
1986-01-01
Outlines the process involved in selecting an outside filming agent for the purpose of preserving a library's or archive's holdings. Guidelines include project planning, selecting a filming agent, and contract preparation and maintenance. A sample contract is included. (Author/EM)
Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April
2016-01-01
Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations. PMID:27606968
Mission Applications Support at NASA: The Proposal Surface Water and Ocean Topography Mission
NASA Astrophysics Data System (ADS)
Srinivasan, Margaret; Peterson, Craig; Callahan, Phil
2013-09-01
The NASA Applied Sciences Program is actively supporting an agency-wide effort to formalize a mission-level data applications approach. The program goal is to engage early-phase NASA Earth satellite mission project teams with applied science representation in the flight mission planning process. The end objective is to "to engage applications-oriented users and organizations early in the satellite mission lifecycle to enable them to envision possible applications and integrate end-user needs into satellite mission planning as a way to increase the benefits to the nation."Two mission applications representatives have been selected for each early phase Tier 2 mission, including the Surface Water and Ocean Topography (SWOT) mission concept. These representatives are tasked with identifying and organizing the applications communities and developing and promoting a process for the mission to optimize the reach of existing applications efforts in order to enhance the applications value of the missions. An early project-level awareness of mission planning decisions that may increase or decrease the utility of data products to diverse user and potential user communities (communities of practice and communities of potential, respectively) has high value and potential return to the mission and to the users.Successful strategies to enhance science and practical applications of projected SWOT data streams will require engaging with and facilitating between representatives in the science, societal applications, and mission planning communities.Some of the elements of this program include:• Identify early adopters of data products• Coordinate applications team, including;Project Scientist, Payload Scientist, ProjectManager, data processing lead• Describe mission and products sufficiently inearly stage of development to effectively incorporate all potential usersProducts and activities resulting from this effort will include (but are not limited to); workshops, workshop summaries, web pages, email lists of interested users/scientists, an Applications Plan, printed materials (posters, brochures) and participation in key meetings.
SU-E-T-327: The Update of a XML Composing Tool for TrueBeam Developer Mode
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yan, Y; Mao, W; Jiang, S
2014-06-01
Purpose: To introduce a major upgrade of a novel XML beam composing tool to scientists and engineers who strive to translate certain capabilities of TrueBeam Developer Mode to future clinical benefits of radiation therapy. Methods: TrueBeam Developer Mode provides the users with a test bed for unconventional plans utilizing certain unique features not accessible at the clinical mode. To access the full set of capabilities, a XML beam definition file accommodating all parameters including kV/MV imaging triggers in the plan can be locally loaded at this mode, however it is difficult and laborious to compose one in a text editor.more » In this study, a stand-along interactive XML beam composing application, TrueBeam TeachMod, was developed on Windows platforms to assist users in making their unique plans in a WYSWYG manner. A conventional plan can be imported in a DICOM RT object as the start of the beam editing process in which trajectories of all axes of a TrueBeam machine can be modified to the intended values at any control point. TeachMod also includes libraries of predefined imaging and treatment procedures to further expedite the process. Results: The TeachMod application is a major of the TeachMod module within DICOManTX. It fully supports TrueBeam 2.0. Trajectories of all axes including all MLC leaves can be graphically rendered and edited as needed. The time for XML beam composing has been reduced to a negligible amount regardless the complexity of the plan. A good understanding of XML language and TrueBeam schema is not required though preferred. Conclusion: Creating XML beams manually in a text editor will be a lengthy error-prone process for sophisticated plans. A XML beam composing tool is highly desirable for R and D activities. It will bridge the gap between scopes of TrueBeam capabilities and their clinical application potentials.« less
NASA Astrophysics Data System (ADS)
Sylak-Glassman, E.; Clavin, C.
2016-12-01
Common approaches to climate resilience planning in the United States rely upon participatory planning approaches and dialogues between decision-makers, science translators, and subject matter experts. In an effort to explore alternative approaches support community climate resilience planning, a pilot of a public-private collaboration called the Resilience Dialogues was held in February and March of 2016. The Resilience Dialogues pilot was an online, asynchronous conversation between community leaders and climate experts, designed to help communities begin the process of climate resilience planning. In order to identify lessons learned from the pilot, we analyzed the discourse of the facilitated dialogues, administered surveys and conducted interviews with participants. Our analysis of the pilot suggests that participating community leaders found value in the consultative dialogue with climate experts, despite limited community-originated requests for climate information. Community leaders most often asked for advice regarding adaptation planning, including specific engineering guidance and advice on how to engage community members around the topic of resilience. Community leaders that had access to downscaled climate data asked experts about how to incorporate the data into their existing planning processes. The guidance sought by community leaders during the pilot shows a large range of hurdles that communities face in using climate information to inform their decision-making processes. Having a forum that connects community leaders with relevant experts and other community leaders who have familiarity with both climate impacts and municipal planning processes would likely help communities accelerate their resilience efforts.
NASA Astrophysics Data System (ADS)
Nasution, Derlina; Syahreni Harahap, Putri; Harahap, Marabangun
2018-03-01
This research aims to: (1) developed a instrument’s learning (lesson plan, worksheet, student’s book, teacher’s guide book, and instrument test) of physics learning through scientific inquiry learning model based Batak culture to achieve skills improvement process of science students and the students’ curiosity; (2) describe the quality of the result of develop instrument’s learning in high school using scientific inquiry learning model based Batak culture (lesson plan, worksheet, student’s book, teacher’s guide book, and instrument test) to achieve the science process skill improvement of students and the student curiosity. This research is research development. This research developed a instrument’s learning of physics by using a development model that is adapted from the development model Thiagarajan, Semmel, and Semmel. The stages are traversed until retrieved a valid physics instrument’s learning, practical, and effective includes :(1) definition phase, (2) the planning phase, and (3) stages of development. Test performed include expert test/validation testing experts, small groups, and test classes is limited. Test classes are limited to do in SMAN 1 Padang Bolak alternating on a class X MIA. This research resulted in: 1) the learning of physics static fluid material specially for high school grade 10th consisted of (lesson plan, worksheet, student’s book, teacher’s guide book, and instrument test) and quality worthy of use in the learning process; 2) each component of the instrument’s learning meet the criteria have valid learning, practical, and effective way to reach the science process skill improvement and curiosity in students.
Extra-terrestrial construction processes - Advancements, opportunities and challenges
NASA Astrophysics Data System (ADS)
Lim, Sungwoo; Prabhu, Vibha Levin; Anand, Mahesh; Taylor, Lawrence A.
2017-10-01
Government space agencies, including NASA and ESA, are conducting preliminary studies on building alternative space-habitat systems for deep-space exploration. Such studies include development of advanced technologies for planetary surface exploration, including an in-depth understanding of the use of local resources. Currently, NASA plans to land humans on Mars in the 2030s. Similarly, other space agencies from Europe (ESA), Canada (CSA), Russia (Roscosmos), India (ISRO), Japan (JAXA) and China (CNSA) have already initiated or announced their plans for launching a series of lunar missions over the next decade, ranging from orbiters, landers and rovers for extended stays on the lunar surface. As the Space Odyssey is one of humanity's oldest dreams, there has been a series of research works for establishing temporary or permanent settlement on other planetary bodies, including the Moon and Mars. This paper reviews current projects developing extra-terrestrial construction, broadly categorised as: (i) ISRU-based construction materials; (ii) fabrication methods; and (iii) construction processes. It also discusses four categories of challenges to developing an appropriate construction process: (i) lunar simulants; (ii) material fabrication and curing; (iii) microwave-sintering based fabrication; and (iv) fully autonomous and scaled-up construction processes.
ERIC Educational Resources Information Center
Briddell, Andrew
2013-01-01
This study of 1,974 fifth grade students investigated potential relationships between writing process-based instruction practices and higher-order thinking measured by a standardized literacy assessment. Writing process is defined as a highly complex, socio-cognitive process that includes: planning, text production, review, metacognition, writing…
Smith, Michael A; Clayman, Marla L; Frader, Joel; Arenson, Melanie; Haber-Barker, Natalie; Ryan, Claire; Emanuel, Linda; Michelson, Kelly
2018-06-19
Little is known about how decision-making conversations occur during pediatric intensive care unit (PICU) family conferences (FCs). Describe the decision-making process and implementation of shared decision making (SDM) during PICU FCs. Observational study. University-based tertiary care PICU, including 31 parents and 94 PICU healthcare professionals involved in FCs. We recorded, transcribed, and analyzed 14 PICU FCs involving decision-making discussions. We used a modified grounded theory and content analysis approach to explore the use of traditionally described stages of decision making (DM) (information exchange, deliberation, and determining a plan). We also identified the presence or absence of predefined SDM elements. DM involved the following modified stages: information exchange; information-oriented deliberation; plan-oriented deliberation; and determining a plan. Conversations progressed through stages in a nonlinear manner. For the main decision discussed, all conferences included a presentation of the clinical issues, treatment alternatives, and uncertainty. A minority of FCs included assessing the family's understanding (21%), assessing the family's need for input from others (28%), exploring the family's desired decision-making role (35%), and eliciting the family's opinion (42%). In the FCs studied, we found that DM is a nonlinear process. We also found that several SDM elements that could provide information about parents' perspectives and needs did not always occur, identifying areas for process improvement.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kabat, C; Cline, K; Li, Y
Purpose: With increasing numbers of cancer patients being diagnosed and the complexity of radiotherapy treatments rising it’s paramount that patient plan development continues to stay fluid within the clinic. In order to maintain a high standard of care and clinical efficiency the establishment of a tracking system for patient plan development allows healthcare providers to view real time plan progression and drive clinical workflow. In addition, it provides statistical datasets which can further identify inefficiencies within the clinic. Methods: An application was developed utilizing Microsoft’s ODBC SQL database engine to track patient plan status throughout the treatment planning process whilemore » also managing key factors pertaining to the patient’s treatment. Pertinent information is accessible to staff in many locations, including tracking monitors within dosimetry, the clinic network for both computers and handheld devices, and through email notifications. Plans are initiated with a CT and continually tracked through planning stages until final approval by staff. Patient’s status is dynamically updated by the physicians, dosimetrists, and medical physicists based on the stage of the patient’s plan. Results: Our application has been running over a six month period with all patients being processed through the system. Modifications have been made to allow for new features to be implemented along with additional tracking parameters. Based on in-house feedback, the application has been supportive in streamlining patient plans through the treatment planning process and data has been accumulating to further improve procedures within the clinic. Conclusion: Over time the clinic will continue to track data with this application. As data accumulates the clinic will be able to highlight inefficiencies within the workflow and adapt accordingly. We will add in new features to help support the treatment planning process in the future.« less
Developing a framework for a toolkit for carbon footprint that integrates transit (CFIT).
DOT National Transportation Integrated Search
2010-11-01
The purpose of this research was to evaluate five transportation planning processes used in Florida to determine how greenhouse gas (GHG) emissions considerations can be incorporated into the processes. These included the federal metropolitan plannin...
Crowther, Martha R; Huang, Chao-Hui Sylvia; Allen, Rebecca S
2015-01-01
This exploratory study examined the context and consequences of custodial grandparenting, along with attitudes and preferences regarding future planning among 22 African-American custodial grandmothers. A mixed-method research design was employed. Based on our integration of two theories regarding future planning and health behavior change, caregiving, emotional distress, religiosity and spirituality, and future planning were assessed using questionnaires along with semi-structured interviews. African-American custodial grandmothers (mean age M = 53.64, SD = 9.58) perceived their caregiving role as rewarding (72%) yet challenging (86%). More than 40% reported significant emotional distress (CES-D ≥ 16) that warrants clinical attention. Findings showed that while 64% of study participants had future plans regarding who will substitute in their caregiving role if they become incapacitated, only 9% had completed a living will. Three major themes emerged regarding custodial grandmothers' caregiving role which includes: (1) rewards; (2) challenges including feeling overwhelmed and health concerns; and (3) caregiving decisions including conflicts between 'My plan was…/put self on-hold' for grandchildren and difficulty with future planning. These themes highlighted the dynamics of caregiving across time, including current context and the ongoing process of decision-making. Findings suggest that while African-American custodial grandmothers find caregiving rewarding, they face unique challenges in contemplating and developing future plans. Custodial grandmothers think about substitute caregivers for their grandchildren but need assistance communicating a plan focused on their own needs for future care. Culturally sensitive interventions designed to facilitate effective utilization of future plans within this caregiver population are needed.
Panzera, Annette June; Murray, Richard; Stewart, Ruth; Mills, Jane; Beaton, Neil; Larkins, Sarah
2016-01-01
Creating a stable and sustainable health workforce in regional, rural and remote Australia has long been a challenge to health workforce planners, policy makers and researchers alike. Traditional health workforce planning is often reactive and assumes continuation of current patterns of healthcare utilisation. This demonstration project in Far North Queensland exemplifies how participatory regional health workforce planning processes can accurately model current and projected local workforce requirements. The recent establishment of Primary Health Networks (PHNs) with the intent to commission health services tailored to individual healthcare needs underlines the relevance of such an approach. This study used action research methodology informed by World Health Organization (WHO) systems thinking. Four cyclical stages of health workforce planning were followed: needs assessment; health service model redesign; skills-set assessment and workforce redesign; and development of a workforce and training plan. This study demonstrated that needs-based loco-regional health workforce planning can be achieved successfully through participatory processes with stakeholders. Stronger health systems and workforce training solutions were delivered by facilitating linkages and planning processes based on community need involving healthcare professionals across all disciplines and sectors. By focusing upon extending competencies and skills sets, local health professionals form a stable and sustainable local workforce. Concrete examples of initiatives generated from this process include developing a chronic disease inter-professional teaching clinic in a rural town and renal dialysis being delivered locally to an Aboriginal community. The growing trend of policy makers decentralising health funding, planning and accountability and rising health system costs increase the future utility of this approach. This type of planning can also assist the new PHNs to commission health services that meet the needs of the population and contribute to service and system improvement and innovation.
Attention Demands of Spoken Word Planning: A Review
Roelofs, Ardi; Piai, Vitória
2011-01-01
Attention and language are among the most intensively researched abilities in the cognitive neurosciences, but the relation between these abilities has largely been neglected. There is increasing evidence, however, that linguistic processes, such as those underlying the planning of words, cannot proceed without paying some form of attention. Here, we review evidence that word planning requires some but not full attention. The evidence comes from chronometric studies of word planning in picture naming and word reading under divided attention conditions. It is generally assumed that the central attention demands of a process are indexed by the extent that the process delays the performance of a concurrent unrelated task. The studies measured the speed and accuracy of linguistic and non-linguistic responding as well as eye gaze durations reflecting the allocation of attention. First, empirical evidence indicates that in several task situations, processes up to and including phonological encoding in word planning delay, or are delayed by, the performance of concurrent unrelated non-linguistic tasks. These findings suggest that word planning requires central attention. Second, empirical evidence indicates that conflicts in word planning may be resolved while concurrently performing an unrelated non-linguistic task, making a task decision, or making a go/no-go decision. These findings suggest that word planning does not require full central attention. We outline a computationally implemented theory of attention and word planning, and describe at various points the outcomes of computer simulations that demonstrate the utility of the theory in accounting for the key findings. Finally, we indicate how attention deficits may contribute to impaired language performance, such as in individuals with specific language impairment. PMID:22069393
SU-E-T-201: Safety-Focused Customization of Treatment Plan Documentation.
Schubert, L; Westerly, D; Stuhr, K; Miften, M
2012-06-01
Plan report documentation contains numerous details about the treatment plan, but critical information for patient safety is often presented without special emphasis. This can make it difficult to detect errors from treatment planning and data transfer during the initial chart review. The objective of this work is to improve safety measures in radiation therapy practice by customizing the treatment plan report to emphasize safety-critical information. Commands within the template file from a commercial planning system (Eclipse, Varian Medical Systems) that automatically generates the treatment plan report were reviewed and modified. Safety-critical plan parameters were identified from published risks known to be inherent in the treatment planning process. Risks having medium to high potential impact on patient safety included incorrect patient identifiers, erroneous use of the treatment prescription, and incorrect transfer of beam parameters or consideration of accessories. Specific examples of critical information in the treatment plan report that can be overlooked during a chart review included prescribed dose per fraction and number of fractions, wedge and open field monitor units, presence of beam accessories, and table shifts for patient setup. Critical information was streamlined and concentrated. Patient and plan identification, dose prescription details, and patient positioning couch shift instructions were placed on the first page. Plan information to verify the correct data transfer to the record and verify system was re-organized in an easy to review tabular format and placed in the second page of the customized printout. Placeholders were introduced to indicate both the presence and absence of beam modifiers. Font sizes and spacing were adjusted for clarity, and departmental standards and terminology were introduced to streamline data communication among staff members. Plan reporting documentation has been customized to concentrate and emphasize safety-critical information, which should allow for a more efficient, robust chart review process. © 2012 American Association of Physicists in Medicine.
TU-AB-BRB-01: Coverage Evaluation and Probabilistic Treatment Planning as a Margin Alternative
DOE Office of Scientific and Technical Information (OSTI.GOV)
Siebers, J.
The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Xu, H.
The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less
TU-AB-BRB-02: Stochastic Programming Methods for Handling Uncertainty and Motion in IMRT Planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Unkelbach, J.
The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less
The computer-generated treatment plan... Create the nucleus to successful systems.
Bernhardt, Christene
2004-12-01
A well-managed, highly efficient practice relies on the comprehensive information provided through effective treatment planning. Computer-generated treatment plans are successful only if the 14 key points of information are included within the plan. Major systems such as scheduling, financial agreements, and insurance processing fail if adequate information is not provided through the treatment plan. Successful interactions with patients at the time of the consultation rely heavily on having adequate information at your fingertips. The treatment plan is truly the foundation to all communications that must occur during the patient's experience, and ensures that every team member has clear and easy access to the status of each patient as treatment unfolds.
Pennel, Cara L; McLeroy, Kenneth R; Burdine, James N; Matarrita-Cascante, David; Wang, Jia
Nonprofit hospitals are exempt from paying taxes. To maintain this status, they must provide benefit to the community they serve. In an attempt to improve accountability to these communities and the federal government, the Patient Protection and Affordable Care Act of 2010 includes a provision that requires all nonprofit hospitals to conduct a community health needs assessment (CHNA) and implement strategies to address identified health priorities every 3 years. This Act's provision, operationalized by a regulation developed and enforced by the Internal Revenue Service, mandates the involvement of public health agencies and other community stakeholders in the completion of the CHNA. To better understand community participation in nonprofit hospital-directed community health assessment and health improvement planning activities. Using a 2-phased, mixed-methods study design, we (1) conducted content analysis of 95 CHNA/implementation plan reports and (2) interviewed hospital and health system key informants, consultants, and community stakeholders involved in CHNA and planning processes. Community participation was assessed in terms of types of stakeholders involved and the depth of their involvement. Our findings suggest that many hospitals engaged and involved community stakeholders in certain aspects of the assessment process, but very few engaged a broad array of community stakeholder and community members in meaningful participation throughout the CHNA and health improvement planning process. Vast improvements in community participation and collaborative assessment and planning can be made in future CHNAs. On the basis of the findings, recommendations are made for further research. Practice implications include expanding community engagement and participation by stakeholder and activity type and using a common community health improvement model that better aligns hospital CHNA processes and implementation strategies with other organizations and agencies.
50 CFR 600.235 - Financial disclosure.
Code of Federal Regulations, 2010 CFR
2010-10-01
....235 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC.... Council decision means approval of a fishery management plan (FMP) or FMP amendment (including any.... Financial interest in harvesting, processing, or marketing (1) includes: (i) Stock, equity, or other...
NASA Technical Reports Server (NTRS)
Rabideau, Gregg; Chien, Steve; Knight, Russell; Schaffer, Steven; Tran, Daniel; Cichy, Benjamin; Sherwood, Robert
2006-01-01
The Automated Scheduling and Planning Environment (ASPEN) computer program has been updated to version 3.0. ASPEN is a modular, reconfigurable, application software framework for solving batch problems that involve reasoning about time, activities, states, and resources. Applications of ASPEN can include planning spacecraft missions, scheduling of personnel, and managing supply chains, inventories, and production lines. ASPEN 3.0 can be customized for a wide range of applications and for a variety of computing environments that include various central processing units and random access memories.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
...This proposed rule would implement provisions of the Strengthening Medicare and Repaying Taxpayers Act of 2012 (SMART Act) which require us to provide a right of appeal and an appeal process for liability insurance (including self-insurance), no-fault insurance, and workers' compensation laws or plans when Medicare pursues a Medicare Secondary Payer (MSP) recovery claim directly from the liability insurance (including self-insurance), no fault insurance, or workers' compensation law or plan.
Persson, Johanna; Dalholm, Elisabeth Hornyánszky; Johansson, Gerd
2014-01-01
To demonstrate the use of visualization and simulation tools in order to involve stakeholders and inform the process in hospital change processes, illustrated by an empirical study from a children's emergency clinic. Reorganization and redevelopment of a hospital is a complex activity that involves many stakeholders and demands. Visualization and simulation tools have proven useful for involving practitioners and eliciting relevant knowledge. More knowledge is desired about how these tools can be implemented in practice for hospital planning processes. A participatory planning process including practitioners and researchers was executed over a 3-year period to evaluate a combination of visualization and simulation tools to involve stakeholders in the planning process and to elicit knowledge about needs and requirements. The initial clinic proposal from the architect was discarded as a result of the empirical study. Much general knowledge about the needs of the organization was extracted by means of the adopted tools. Some of the tools proved to be more accessible than others for the practitioners participating in the study. The combination of tools added value to the process by presenting information in alternative ways and eliciting questions from different angles. Visualization and simulation tools inform a planning process (or other types of change processes) by providing the means to see beyond present demands and current work structures. Long-term involvement in combination with accessible tools is central for creating a participatory setting where the practitioners' knowledge guides the process. © 2014 Vendome Group, LLC.
NASA Technical Reports Server (NTRS)
Cavanaugh, J.
1994-01-01
This plan describes methods and procedures Aerojet will follow in the implementation of configuration control for each established baseline. The plan is written in response to the GSFC EOS CM Plan 420-02-02, dated January 1990, and also meets he requirements specified in DOD-STD-480, DOD-D 1000B, MIL-STD-483A, and MIL-STD-490B. The plan establishes the configuration management process to be used for the deliverable hardware, software, and firmware of the EOS/AMSU-A during development, design, fabrication, test, and delivery. This revision includes minor updates to reflect Aerojet's CM policies.
NASA IVHM Technology Experiment for X-vehicles (NITEX)
NASA Technical Reports Server (NTRS)
Sandra, Hayden; Bajwa, Anupa
2001-01-01
The purpose of the NASA IVHM Technology Experiment for X-vehicles (NITEX) is to advance the development of selected IVHM technologies in a flight environment and to demonstrate the potential for reusable launch vehicle ground processing savings. The technologies to be developed and demonstrated include system-level and detailed diagnostics for real-time fault detection and isolation, prognostics for fault prediction, automated maintenance planning based on diagnostic and prognostic results, and a microelectronics hardware platform. Complete flight The Evolution of Flexible Insulation as IVHM consists of advanced sensors, distributed data acquisition, data processing that includes model-based diagnostics, prognostics and vehicle autonomy for control or suggested action, and advanced data storage. Complete ground IVHM consists of evolved control room architectures, advanced applications including automated maintenance planning and automated ground support equipment. This experiment will advance the development of a subset of complete IVHM.
NASA Astrophysics Data System (ADS)
Limatahu, I.; Sutoyo, S.; Wasis; Prahani, B. K.
2018-03-01
In the previous research, CCDSR (Condition, Construction, Development, Simulation, and Reflection) learning model has been developed to improve science process skills for pre-service physics teacher. This research is aimed to analyze the effectiveness of CCDSR learning model towards the improvement skills of creating lesson plan and worksheet of Science Process Skill (SPS) for pre-service physics teacher in academic year 2016/2017. This research used one group pre-test and post-test design on 12 pre-service physics teacher at Physics Education, University of Khairun. Data collection was conducted through test and observation. Creating lesson plan and worksheet SPS skills of pre-service physics teacher measurement were conducted through Science Process Skill Evaluation Sheet (SPSES). The data analysis technique was done by Wilcoxon t-test and n-gain. The CCDSR learning model consists of 5 phases, including (1) Condition, (2) Construction, (3) Development, (4) Simulation, and (5) Reflection. The results showed that there was a significant increase in creating lesson plan and worksheet SPS skills of pre-service physics teacher at α = 5% and n-gain average of moderate category. Thus, the CCDSR learning model is effective for improving skills of creating lesson plan and worksheet SPS for pre-service physics teacher.
Oak management by county jurisdictions in the central Sierra Nevada, California
Richard R. Harris; Susan D. Kocher
2002-01-01
We evaluated county planning policies and procedures to determine what protection is provided to oak woodlands during the land development process. We selected three Sierra Nevada counties to do a pilot assessment: El Dorado, Placer and Madera. The assessment methodology included three components: 1) analysis of county plans, policies, guidelines, and ordinances to...
Rural watershed partnerships: lessons from West Virginia
Steve W. Selin; Alan Collins; Susan Hunter
1998-01-01
The goal of this study is to examine the efforts by one state government (West Virginia) to facilitate collaborative, watershed-based planning. This paper provides an overview of the state watershed planning process and includes a summary of a baseline study of rural watershed partnerships operating within West Virginia. Implication of the study for state policies and...
Planning the Fire Program for the Third Millennium
Richard A. Chase
1987-01-01
The fire program planner faces an increasingly complex task as diverse--and often contradictory--messages about objectives and constraints are received from political, administrative, budgetary, and social processes. Our principal challenge as we move into the 21st century is not one of looking for flashier technology to include in the planned fire program. Rather, we...
Pamela Jakes; Sam Burns; Antony Cheng; Emily Saeli; Kristen Nelson Rachel Brummel; Stephanie Grayzeck; Victoria Sturtevant; Daniel Williams
2007-01-01
Community wildfire protection plans (CWPPs) are being developed and implemented in communities across the United States. In a series of case studies, researchers found that the process of developing a CWPP can lead to benefits beyond those associated with fuels reduction, including enhancing social networks, developing learning communities, and building community...
Implementation plan for HANDI 2000 TWRS master equipment list
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENNION, S.I.
This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.
Integrating fire management into land management planning for west-side forests
Peter D. Teensma
1996-01-01
Fire management's integration into land management planning is critical to the successful management of nearly all wildland ecosystems, including westside forests, which lie west of the Cascade crest in Oregon and the northern coastal ranges in California. Restoration and maintenance of fire as an ecosystem process is critical to retention of biological diversity...
ERIC Educational Resources Information Center
Wholeben, Brent Edward
A rationale is presented for viewing the decision-making process inherent in determining budget reductions for educational programs as most effectively modeled by a graduated funding approach. The major tenets of the graduated budget reduction approach to educational fiscal policy include the development of multiple alternative reduction plans, or…
The College Connection: A Handbook for High School Students. Links to Success.
ERIC Educational Resources Information Center
Houston Independent School District, TX.
This handbook is a year-by-year planning guide to college preparatory activities for high school students and it begins with the 9th grade. These topics are included: (1) introduction to planning and the decision-making process; (2) educational and occupational alternatives; (3) considerations in choosing a college; (4) types of academic…
School Counselor Lead Initial Individual Career and Academic Plan Implementation Design
ERIC Educational Resources Information Center
Moeder-Chandler, Markus
2017-01-01
In Fall of 2014 for Fountain-Fort Carson School District #8 undertook a revamping of graduation and state-mandated ICAP requirements for implementation for the graduating class of 2021. This design and implementation process included numerous stakeholders and several years of planning from Fall of 2014 to Spring of 2017. The design and…
NASA Technical Reports Server (NTRS)
1980-01-01
A brief description of the Global Weather Experiment is presented. The world weather watch program plan is described and includes a global observing system, a global data processing system, a global telecommunication system, and a voluntary cooperation program. A summary of Federal Agency plans and programs to meet the challenges of international meteorology for the two year period, FY 1980-1981, is presented.
Patient Activities Planning and Progress Noting a Humanistic Integrated-Team Approach.
ERIC Educational Resources Information Center
Muilenburg, Ted
This document outlines a system for planning recreation therapy, documenting progress, and relating the entire process to a team approach which includes patient assessment and involvement. The recreation program is seen as therapeutic, closely related to the total medical treatment program. The model is designed so that it can be adapted to almost…
The development and evaluation of a succession planning programme in nursing, in Australia.
Brunero, Scott; Kerr, Suzie; Jastrzab, Grazyna
2009-07-01
This study reports on a locally organized model of succession planning in a 550-bed general hospital. Within healthcare, succession planning has traditionally been considered for people at the executive director level and little research has been published with nurses working at the clinical level. A succession planning model was developed from the literature and through a process of consultation with senior staff. The model was then evaluated from a customer satisfaction, programme progress, effective placement and organizational results perspectives. Nurses who were successful in obtaining a new role were surveyed after 6 weeks in the position. Descriptive statistics, including numbers of placements and types of positions filled, were recorded. A checklist for conducting a programme evaluation of succession planning was also used. Twenty-five nurses participated, with 31 positions succeeded to. Nurses reported positively that the programme was beneficial, increased their sense of career planning and gave them a greater understanding of their career pathway. The succession planning programme provided an opportunity for the organization to identify new leaders. The study outcomes have identified potential improvements to the way succession planning is conducted at the hospital. Nurse Managers are in key positions to develop effective succession planning models. This study offers a process for managers to develop effective succession planning programmes within their organization.
Forming social capital--does participatory planning foster trust in institutions?
Menzel, Susanne; Buchecker, Matthias; Schulz, Tobias
2013-12-15
Participatory planning that includes interest groups and municipal representatives has been presented as a means to deal with the increasing difficulty to reach arrangements due to progressively scarce land resources. Under dispute is whether collaborative forms of planning augment social capital or whether they might actually cause the destruction of such a valuable social commodity. In this paper we focus on trust in institution as a specific dimension of social capital because we argue that this is one of the effects the convenors of such participatory planning procedures are most interested in. We pursue a pre-post design and survey advisory group members of five on-going river-related planning processes in Switzerland. Controlling for generalised trust, we investigate how trust in institutions is affected over time by the quality of such processes and the degree of participation they offer. We find that generalised trust is highly correlated with initial levels of trust and so is process quality. Particularly the latter finding challenges the usually assumed direction of causality according to which process quality influences trust building. Additionally, we find a positive (non-significant) effect of process quality on changes in trust, while a higher degree of participation rather seems to hinder trust building. We suppose this indicates that under the conditions of limited time and resources more attention should be paid to how to improve the quality of participatory processes than putting much effort in increasing the degree of participation. Copyright © 2013 Elsevier Ltd. All rights reserved.
A Search Algorithm for Generating Alternative Process Plans in Flexible Manufacturing System
NASA Astrophysics Data System (ADS)
Tehrani, Hossein; Sugimura, Nobuhiro; Tanimizu, Yoshitaka; Iwamura, Koji
Capabilities and complexity of manufacturing systems are increasing and striving for an integrated manufacturing environment. Availability of alternative process plans is a key factor for integration of design, process planning and scheduling. This paper describes an algorithm for generation of alternative process plans by extending the existing framework of the process plan networks. A class diagram is introduced for generating process plans and process plan networks from the viewpoint of the integrated process planning and scheduling systems. An incomplete search algorithm is developed for generating and searching the process plan networks. The benefit of this algorithm is that the whole process plan network does not have to be generated before the search algorithm starts. This algorithm is applicable to large and enormous process plan networks and also to search wide areas of the network based on the user requirement. The algorithm can generate alternative process plans and to select a suitable one based on the objective functions.
TU-AB-BRB-00: New Methods to Ensure Target Coverage
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2015-06-15
The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less
Mir, Ali Mohammad; Shaikh, Gul Rashida
2013-01-01
ABSTRACT A USAID-sponsored family planning project called “FALAH” (Family Advancement for Life and Health), implemented in 20 districts of Pakistan, aimed to lower unmet need for family planning by improving access to services. To enhance the quality of care offered by the public health system, the FALAH project trained 10,534 facility-based health care providers, managers, and medical college faculty members to offer client-centered family planning services, which included a module to explain the Islamic viewpoint on family planning developed through an iterative process involving religious scholars and public health experts. At the end of the FALAH project, we conducted a situation analysis of health facilities including interviews with providers to measure family planning knowledge of trained and untrained providers; interviewed faculty to obtain their feedback about the training module; and measured changes in women's contraceptive use through baseline and endline surveys. Trained providers had a better understanding of family planning concepts than untrained providers. In addition, discussions with trained providers indicated that the training module on Islam and family planning helped them to become advocates for family planning. Faculty indicated that the module enhanced their confidence about the topic of family planning and Islam, making it easier to introduce and discuss the issue with their students. Over the 3.5-year project period, which included several components in addition to the training activity, we found an overall increase of 9 percentage points in contraceptive prevalence in the project implementation districts—from 29% to 38%. The Islam and family planning module has now been included in the teaching program of major public-sector medical universities and the Regional Training Institutes of the Population Welfare Department. Other countries with sizeable Muslim populations and low contraceptive prevalence could benefit from this module. PMID:25276535
Aerobic Digestion. Biological Treatment Process Control. Instructor's Guide.
ERIC Educational Resources Information Center
Klopping, Paul H.
This unit on aerobic sludge digestion covers the theory of the process, system components, factors that affect the process performance, standard operational concerns, indicators of steady-state operations, and operational problems. The instructor's guide includes: (1) an overview of the unit; (2) lesson plan; (3) lecture outline (keyed to a set of…
Segmentation in Tardigrada and diversification of segmental patterns in Panarthropoda.
Smith, Frank W; Goldstein, Bob
2017-05-01
The origin and diversification of segmented metazoan body plans has fascinated biologists for over a century. The superphylum Panarthropoda includes three phyla of segmented animals-Euarthropoda, Onychophora, and Tardigrada. This superphylum includes representatives with relatively simple and representatives with relatively complex segmented body plans. At one extreme of this continuum, euarthropods exhibit an incredible diversity of serially homologous segments. Furthermore, distinct tagmosis patterns are exhibited by different classes of euarthropods. At the other extreme, all tardigrades share a simple segmented body plan that consists of a head and four leg-bearing segments. The modular body plans of panarthropods make them a tractable model for understanding diversification of animal body plans more generally. Here we review results of recent morphological and developmental studies of tardigrade segmentation. These results complement investigations of segmentation processes in other panarthropods and paleontological studies to illuminate the earliest steps in the evolution of panarthropod body plans. Copyright © 2016 Elsevier Ltd. All rights reserved.
The Technical Work Plan Tracking Tool
NASA Technical Reports Server (NTRS)
Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.
2003-01-01
The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.
Backer, Hermanni; Leppänen, Juha-Markku; Brusendorff, Anne Christine; Forsius, Kaj; Stankiewicz, Monika; Mehtonen, Jukka; Pyhälä, Minna; Laamanen, Maria; Paulomäki, Hanna; Vlasov, Nikolay; Haaranen, Tarja
2010-05-01
The Helsinki Commission (HELCOM) Baltic Sea Action Plan, adopted by the coastal countries of the Baltic Sea and the European Community in November 2007, is a regional intergovernmental programme of measures for the protection and management of the marine environment explicitly based on the Ecosystem Approach. The Action Plan is structured around a set of Ecological Objectives used to define indicators and targets, including effect-based nutrient input ceilings, and to monitor implementation. The Action Plan strongly links Baltic marine environmental concerns to important socio-economic fields such as agriculture and fisheries and promotes cross-sectoral tools including marine spatial planning. Due to complementarities with the European Union (EU) Marine Strategy Framework Directive, the Action Plan is in essence a pilot for this process without neglecting the important role of the Russian Federation - the only Baltic coastal country not a member of the EU. (c) 2009 Elsevier Ltd. All rights reserved.
40 CFR 35.603 - Competitive process.
Code of Federal Regulations, 2010 CFR
2010-07-01
... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Water Quality Cooperative Agreements (section 104(b)(3)) § 35.603 Competitive process. EPA will award water quality cooperative agreement funds... a Performance Partnership Grant, the water quality work plan commitments must be included in the...
Deferred Maintenance Program Handbook.
ERIC Educational Resources Information Center
California State Dept. of General Services, Sacramento. Office of Public School Construction.
This handbook provides process information on California's Deferred Maintenance Program, including a description of the administering body of law. Chapters discuss the program's process on the topics of basic/additional apportionment, fund release (basic/additional and critical hardship), the Deferred Maintenance Five-Year Plan, district deposit,…
ERIC Educational Resources Information Center
Pappas, Marjorie L.
2003-01-01
Presents a thematic unit for middle schools on editorial writing, or persuasive writing, based on the Pathways Model for information skills lessons. Includes assessing other editorials; student research process journals; information literacy and process skills; and two lesson plans that involve library media specialists as well as teachers. (LRW)
40 CFR 35.603 - Competitive process.
Code of Federal Regulations, 2014 CFR
2014-07-01
... a Performance Partnership Grant, the water quality work plan commitments must be included in the... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Water Quality Cooperative Agreements (section 104(b)(3)) § 35.603 Competitive process. EPA will award water quality cooperative agreement funds...
40 CFR 35.603 - Competitive process.
Code of Federal Regulations, 2012 CFR
2012-07-01
... a Performance Partnership Grant, the water quality work plan commitments must be included in the... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Water Quality Cooperative Agreements (section 104(b)(3)) § 35.603 Competitive process. EPA will award water quality cooperative agreement funds...
40 CFR 35.603 - Competitive process.
Code of Federal Regulations, 2011 CFR
2011-07-01
... a Performance Partnership Grant, the water quality work plan commitments must be included in the... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Water Quality Cooperative Agreements (section 104(b)(3)) § 35.603 Competitive process. EPA will award water quality cooperative agreement funds...
40 CFR 35.603 - Competitive process.
Code of Federal Regulations, 2013 CFR
2013-07-01
... a Performance Partnership Grant, the water quality work plan commitments must be included in the... STATE AND LOCAL ASSISTANCE Environmental Program Grants for Tribes Water Quality Cooperative Agreements (section 104(b)(3)) § 35.603 Competitive process. EPA will award water quality cooperative agreement funds...
Reasons Parents Buy Prepackaged, Processed Meals: It Is More Complicated Than "I Don't Have Time".
Horning, Melissa L; Fulkerson, Jayne A; Friend, Sarah E; Story, Mary
2017-01-01
To investigate reasons why parents purchase prepackaged, processed meals and associations with parental cooking self-efficacy, meal-planning ability, and home food availability. This secondary data analysis uses Healthy Home Offerings via the Mealtime Environment Plus study data from parents of children aged 8-12 years (n = 160). Associations between reasons why parents purchase prepackaged, processed meals and the outcomes were assessed with chi-square, Fisher exact, and t tests. The most frequently endorsed reasons for purchasing prepackaged, processed meals included lack of time (57%) and family preferences (49%). Five of 6 reasons were associated with lower parental cooking self-efficacy and meal-planning ability. Some reasons were associated with less-healthful home food environments; few reasons varied by socio-demographic characteristics. Because lower cooking self-efficacy and meal-planning ability are associated with most reasons reported for purchasing prepackaged, processed meals, strategies to increase these attributes for parents of all backgrounds may reduce reliance on prepackaged processed meals for family mealtimes. Copyright © 2016 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Albrecht, J.; Juta, K.; Nobis, A.
2009-04-01
In the past, identifying anthropogenic influences on climate change, scenario analyses and issues of climate change mitigation were predominant approaches in climate change research (IPCC 2007). Currently, for instance in Germany, climate impact research on regional level comes to the forefront of research and policy making. Climate change has become an important topic on the agenda of politicians, administration and planning. In order to counteract the (unavoidable) climate change and its impacts it is necessary to develop adaptation strategies. At present, such strategies and guidelines are formulated on international, supranational and national level. The initial point was the United Nations Framework Convention on Climate Change in 1992 where the contracting states obligated themselves to develop national (and regional) programmes for adaptation. In 2007 the European Commission published its Green Paper called Adaptation to Climate Change in Europe. The paper states that adaptation efforts have to be intensified at different (spatial) levels (local, regional, national, and so forth). Furthermore, coordinating these efforts is of high importance. With the recent agreement on the German Adaptation Strategy to Climate Change (DAS 2008) in December 2008, federal government tries to accomplish this task. The German strategy mainly focuses on two elements: decreasing vulnerability and increasing adaptability. While the above mentioned strategies have presented information and policies concerning climate change and adaptation on international, supranational and national level, such documents dońt yet exist on regional level. However, because of their close link to the local level the regions are of high importance for adaptation strategies. Therefore, the Leibniz-Institute of Ecological and Regional Development developed a transdisciplinary project to formulate and implement the so-called Integrated Regional Climate Adaptation Programme (IRCAP) for the Model Region of Dresden (project REGKLAM). The REGKLAM-project is based on regionalised scenarios of climate change and includes measures of climate change adaptation to change for instance, urban form, infrastructure assets (e.g., reservoirs) and land use. Various institutions from politics, administration, economy, and research as well as civil society are involved in the project (the city of Dresden, several ministries and authorities of Saxony, the Dresden Chamber of Industry and Commerce and the University of Dresden). The IRCAP is planned to be an informal, cross-sectoral instrument of adaptation to climate change. As a regional programme, the IRCAP is addressed to decision-makers of the region of Dresden (defined, for instance, as planning region). Its function is to complement and coordinate existing instruments and measures. These instruments also include instruments of environmental and spatial planning on the regional level. Spatial and environmental planning can rely on a wide range of formal and informal instruments on different spatial, administrative, and sectoral levels, e.g. land use and landscape plans. Our contribution to the EGU conference aims to clear the role and relevance of the existing formal and informal planning instruments in the region of Dresden for the process of developing the IRCAP. Firstly, a survey is conducted for the purpose of identifying all relevant planning instruments. The identification process is based on specific criteria, for example: reference to the region, contents relating to the topic of climate change respectively climate adaptation. Secondly, the presentation argues for a selection of those planning instruments which seem to be most relevant for the process of developing an IRCAP. This selection process is based on specific criteria which include, for instance, complexity of expected effects, reference to regional and sectoral vulnerability, opportunity for future change of the existing planning instruments (e.g., current process of updating), interests of project partners and stakeholders. Thirdly, as a result, an overview of relevant planning instruments in the region of Dresden is shown, including their current status and statements about their relevance for the topic of climate adaptation strategies. Finally it is derived that this procedure provides a basis for the following possibilities: Adapting existing planning instruments, integrate contents of existing planning instruments in the IRCAP process, or develop and define new strategies or measures on the way to an IRCAP.
Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Klus, W. J.
1987-01-01
The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.
NASA Astrophysics Data System (ADS)
Lober, Terence
The thesis is concerned with the prospects for reducing strategic-local tensions in the British planning process. It examines the conflicts surrounding small general aviation aerodromes as a means of understanding these tensions, why they have evolved, and if they might be reconciled through planning reform. The only prior academic research to have touched upon this issue through general aviation has been an ESRC funded project undertaken by Gallent and colleagues (1999), who found aerodromes provided a microcosm of planning's issues. Building on this work, the thesis develops what is meant by strategic-local tensions, which in broad terms are described as differences between national and regional guidance/plans and what actually takes place locally. Moving from a basic research question it develops a wide planning perspective based on the literature by discussing the meaning of planning, its history and issues for example, how conflicts in planning might be influenced by the broader socio-political environment. The thesis then arrives at three hypotheses which question the effectiveness of the existing strategic guideline implementation process, develops a local planning authority framework and addresses issues of reflectivity and bias. Results from three national surveys of pilots, aerodromes and manufacturers, plus longitudinal analysis of government and other datasets, are then used to detail a comprehensive and unique description of general aviation, which includes a costing based account of the direct expenditure of flying activity. This provides a substantive foundation for a local planning authority survey which both extends previous boundaries and enables the process of implementing strategic objectives to be disaggregated and evaluated. Field visits to twenty six aerodromes and five local authorities are subsequently used to explore gaps within the strategic implementation process and to develop conclusions, within the wider landscape of planning, about the nature of strategic local tensions and implications for planning reform.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matuszak, M; Anderson, C; Lee, C
Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less
TQM (Total Quality Management) SPARC (Special Process Action Review Committees) Handbook
1989-08-01
This document describes the techniques used to support and guide the Special Process Action Review Committees for accomplishing their goals for Total Quality Management (TQM). It includes concepts and definitions, checklists, sample formats, and assessment criteria. Keywords: Continuous process improvement; Logistics information; Process analysis; Quality control; Quality assurance; Total Quality Management ; Statistical processes; Management Planning and control; Management training; Management information systems.
Cleary, Susan; Molyneux, Sassy; English, Mike
2017-01-01
Abstract This paper describes and evaluates the budgeting and planning processes in public hospitals in Kenya. We used a qualitative case study approach to examine these processes in two hospitals in Kenya. We collected data by in-depth interviews of national level policy makers, hospital managers, and frontline practitioners in the case study hospitals (n = 72), a review of documents, and non-participant observations within the hospitals over a 7 month period. We applied an evaluative framework that considers both consequentialist and proceduralist conditions as important to the quality of priority-setting processes. The budgeting and planning process in the case study hospitals was characterized by lack of alignment, inadequate role clarity and the use of informal priority-setting criteria. With regard to consequentialist conditions, the hospitals incorporated economic criteria by considering the affordability of alternatives, but rarely considered the equity of allocative decisions. In the first hospital, stakeholders were aware of - and somewhat satisfied with - the budgeting and planning process, while in the second hospital they were not. Decision making in both hospitals did not result in reallocation of resources. With regard to proceduralist conditions, the budgeting and planning process in the first hospital was more inclusive and transparent, with the stakeholders more empowered compared to the second hospital. In both hospitals, decisions were not based on evidence, implementation of decisions was poor and the community was not included. There were no mechanisms for appeals or to ensure that the proceduralist conditions were met in both hospitals. Public hospitals in Kenya could improve their budgeting and planning processes by harmonizing these processes, improving role clarity, using explicit priority-setting criteria, and by incorporating both consequentialist (efficiency, equity, stakeholder satisfaction and understanding, shifted priorities, implementation of decisions), and proceduralist (stakeholder engagement and empowerment, transparency, use of evidence, revisions, enforcement, and incorporating community values) conditions. PMID:27679522
Barasa, Edwine W; Cleary, Susan; Molyneux, Sassy; English, Mike
2017-04-01
This paper describes and evaluates the budgeting and planning processes in public hospitals in Kenya. We used a qualitative case study approach to examine these processes in two hospitals in Kenya. We collected data by in-depth interviews of national level policy makers, hospital managers, and frontline practitioners in the case study hospitals (n = 72), a review of documents, and non-participant observations within the hospitals over a 7 month period. We applied an evaluative framework that considers both consequentialist and proceduralist conditions as important to the quality of priority-setting processes. The budgeting and planning process in the case study hospitals was characterized by lack of alignment, inadequate role clarity and the use of informal priority-setting criteria. With regard to consequentialist conditions, the hospitals incorporated economic criteria by considering the affordability of alternatives, but rarely considered the equity of allocative decisions. In the first hospital, stakeholders were aware of - and somewhat satisfied with - the budgeting and planning process, while in the second hospital they were not. Decision making in both hospitals did not result in reallocation of resources. With regard to proceduralist conditions, the budgeting and planning process in the first hospital was more inclusive and transparent, with the stakeholders more empowered compared to the second hospital. In both hospitals, decisions were not based on evidence, implementation of decisions was poor and the community was not included. There were no mechanisms for appeals or to ensure that the proceduralist conditions were met in both hospitals. Public hospitals in Kenya could improve their budgeting and planning processes by harmonizing these processes, improving role clarity, using explicit priority-setting criteria, and by incorporating both consequentialist (efficiency, equity, stakeholder satisfaction and understanding, shifted priorities, implementation of decisions), and proceduralist (stakeholder engagement and empowerment, transparency, use of evidence, revisions, enforcement, and incorporating community values) conditions. © The Author 2016. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine.
Motivations and Barriers for Policymakers to Developing State Adaptation Plans
NASA Astrophysics Data System (ADS)
Miller, R.; Sylak-Glassman, E.
2016-12-01
Current approaches for developing high-quality adaptation plan require significant resources. In recent years, communities have grown to embrace adaptive plans across multiple forms, including adaptive capacity assessments, resilience strategies, and vulnerability assessments. Across the United States, as of this writing, 14 states have established adaptation plans, with another 8 states having begun the process. Given the high resources requirements and increasing interest in the development of adaptation plans, we aim to examine patterns behind the establishment of resilience plans at the state level. We examine demographic, financial, political, and physical characteristics associated with different states in an effort to explore the reasoning behind investing in the development of adaptation plans. This analysis considers quantitative and qualitative factors, including recent elections for political parties, politicians' climate-related statements and campaign promises, demographics, budgets, and regional climate threats. The analysis aims to identify motivations for state leadership taking action to develop adaptation plans. Results from the analysis seek to identify the primary drivers and barriers associated with state-wide resilience planning. These results could inform the design of scientific communication tools or approaches to aid future adaptation responses to climate change.
Generation capacity expansion planning in deregulated electricity markets
NASA Astrophysics Data System (ADS)
Sharma, Deepak
With increasing demand of electric power in the context of deregulated electricity markets, a good strategic planning for the growth of the power system is critical for our tomorrow. There is a need to build new resources in the form of generation plants and transmission lines while considering the effects of these new resources on power system operations, market economics and the long-term dynamics of the economy. In deregulation, the exercise of generation planning has undergone a paradigm shift. The first stage of generation planning is now undertaken by the individual investors. These investors see investments in generation capacity as an increasing business opportunity because of the increasing market prices. Therefore, the main objective of such a planning exercise, carried out by individual investors, is typically that of long-term profit maximization. This thesis presents some modeling frameworks for generation capacity expansion planning applicable to independent investor firms in the context of power industry deregulation. These modeling frameworks include various technical and financing issues within the process of power system planning. The proposed modeling frameworks consider the long-term decision making process of investor firms, the discrete nature of generation capacity addition and incorporates transmission network modeling. Studies have been carried out to examine the impact of the optimal investment plans on transmission network loadings in the long-run by integrating the generation capacity expansion planning framework within a modified IEEE 30-bus transmission system network. The work assesses the importance of arriving at an optimal IRR at which the firm's profit maximization objective attains an extremum value. The mathematical model is further improved to incorporate binary variables while considering discrete unit sizes, and subsequently to include the detailed transmission network representation. The proposed models are novel in the sense that the planning horizon is split into plan sub-periods so as to minimize the overall risks associated with long-term plan models, particularly in the context of deregulation.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-29
... amends the rule by adding language that better clarifies specific roles and responsibilities to the... existing rule but merely add language that better clarifies specific roles and responsibilities including... process requirements, including roles and responsibilities. Section (1) revises language to include...
Optimizing spacecraft design - optimization engine development : progress and plans
NASA Technical Reports Server (NTRS)
Cornford, Steven L.; Feather, Martin S.; Dunphy, Julia R; Salcedo, Jose; Menzies, Tim
2003-01-01
At JPL and NASA, a process has been developed to perform life cycle risk management. This process requires users to identify: goals and objectives to be achieved (and their relative priorities), the various risks to achieving those goals and objectives, and options for risk mitigation (prevention, detection ahead of time, and alleviation). Risks are broadly defined to include the risk of failing to design a system with adequate performance, compatibility and robustness in addition to more traditional implementation and operational risks. The options for mitigating these different kinds of risks can include architectural and design choices, technology plans and technology back-up options, test-bed and simulation options, engineering models and hardware/software development techniques and other more traditional risk reduction techniques.
International Tours with Student Ensembles.
ERIC Educational Resources Information Center
Wilcox, Ella
2001-01-01
Discusses the process of planning an international performance tour to include discussions on the mission, preparation, funding, delegation, and communication. Includes information on immunizations, passports, visas, tour companies, choosing a tour company, resources for travel information, and tips for travel with student performers. (CMK)
2007-12-05
This rule with comment period finalizes the Medicare program provisions relating to contract determinations involving Medicare Advantage (MA) organizations and Medicare Part D prescription drug plan sponsors, including eliminating the reconsideration process for review of contract determinations, revising the provisions related to appeals of contract determinations, and clarifying the process for MA organizations and Part D plan sponsors to complete corrective action plans. In this final rule with comment period, we also clarify the intermediate sanction and civil money penalty (CMP) provisions that apply to MA organizations and Medicare Part D prescription drug plan sponsors, modify elements of their compliance plans, retain voluntary self-reporting for Part D sponsors and implement a voluntary self-reporting recommendation for MA organizations, and revise provisions to ensure HHS has access to the books and records of MA organizations and Part D plan sponsors' first tier, downstream, and related entities. Although we have decided not to finalize the mandatory self-reporting provisions that we proposed, CMS remains committed to adopting a mandatory self-reporting requirement. To that end, we are requesting comments that will assist CMS in crafting a future proposed regulation for a mandatory self-reporting requirement.
Periodic, On-Demand, and User-Specified Information Reconciliation
NASA Technical Reports Server (NTRS)
Kolano, Paul
2007-01-01
Automated sequence generation (autogen) signifies both a process and software used to automatically generate sequences of commands to operate various spacecraft. Autogen requires fewer workers than are needed for older manual sequence-generation processes and reduces sequence-generation times from weeks to minutes. The autogen software comprises the autogen script plus the Activity Plan Generator (APGEN) program. APGEN can be used for planning missions and command sequences. APGEN includes a graphical user interface that facilitates scheduling of activities on a time line and affords a capability to automatically expand, decompose, and schedule activities.
Manufacturing engineering: Principles for optimization
NASA Astrophysics Data System (ADS)
Koenig, Daniel T.
Various subjects in the area of manufacturing engineering are addressed. The topics considered include: manufacturing engineering organization concepts and management techniques, factory capacity and loading techniques, capital equipment programs, machine tool and equipment selection and implementation, producibility engineering, methods, planning and work management, and process control engineering in job shops. Also discussed are: maintenance engineering, numerical control of machine tools, fundamentals of computer-aided design/computer-aided manufacture, computer-aided process planning and data collection, group technology basis for plant layout, environmental control and safety, and the Integrated Productivity Improvement Program.
Dalton, Vanessa K; Jacobson, Peter D; Berson-Grand, Julie; Weisman, Carol S
2005-01-01
Title X is the only federal funding specifically for contraception and family planning services. This study identifies the threats and challenges Title X family planning organizations face in Michigan, and examines organizational responses to these challenges. We hypothesized that organizational responses to current challenges, including recent legislation, would differ between organizational types. We used a multiple case study design to examine safety net providers that received Title X funding in 2001. Cases were selected to represent economic and geographic diversity and included a mix of population densities. Key informants at each organization participated in face-to-face, semistructured interviews. Interviews collected data on current challenges, organizational planning processes, and organizational responses. All Title X organizations reported significant challenges, including rising costs, increasing need, and inadequate funding. Private organizations were more concerned about political challenges, especially recent Michigan legislation, than health departments. Organizational type was associated with the type of response. Health departments tended to close clinics or cut services, whereas private organizations recruited insured populations and increased patient fees. Based on these findings, the family planning safety net in Michigan appears to be undergoing significant change. These changes may decrease the availability of affordable family planning services in Michigan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mobrand, Lars Erik; Lestelle, Lawrence C.
In the spring of 1994 a technical planning support project was initiated by the Grande Ronde Model Watershed Board of Directors (Board) with funding from the Bonneville Power Administration. The project was motivated by a need for a science based method for prioritizing restoration actions in the basin that would promote effectiveness and accountability. In this section the authors recall the premises for the project. The authors also present a set of recommendations for implementing a watershed planning process that incorporates a science-based framework to help guide decision making. This process is intended to assist the Grande Ronde Model Watershedmore » Board in its effort to plan and implement watershed improvement measures. The process would also assist the Board in coordinating its efforts with other entities in the region. The planning process is based on an approach for developing an ecosystem management strategy referred to as the Ecosystem Diagnosis and Treatment (EDT) method (Lichatowich et al. 1995, Lestelle et al. 1996). The process consists of an on-going planning cycle. Included in this cycle is an assessment of the ability of the watershed to support and sustain natural resources and other economic and societal values. This step in the process, which the authors refer to as the diagnosis, helps guide the development of actions (also referred to as treatments) aimed at improving the conditions of the watershed to achieve long-term objectives. The planning cycle calls for routinely reviewing and updating, as necessary, the basis for the diagnosis and other analyses used by the Board in adopting actions for implementation. The recommendations offered here address this critical need to habitually update the information used in setting priorities for action.« less
Watchman, Karen; Janicki, Matthew P; Splaine, Michael; Larsen, Frode K; Gomiero, Tiziano; Lucchino, Ronald
2017-06-01
The World Health Organization (WHO) has called for the development and adoption of national plans or strategies to guide public policy and set goals for services, supports, and research related to dementia. It called for distinct populations to be included within national plans, including adults with intellectual disability (ID). Inclusion of this group is important as having Down's syndrome is a significant risk factor for early-onset dementia. Adults with other ID may have specific needs for dementia-related care that, if unmet, can lead to diminished quality of old age. An International Summit on Intellectual Disability and Dementia, held in Scotland, reviewed the inclusion of ID in national plans and recommended that inclusion goes beyond just description and relevance of ID. Reviews of national plans and reports on dementia show minimal consideration of ID and the challenges that carers face. The Summit recommended that persons with ID, as well as family carers, should be included in consultation processes, and greater advocacy is required from national organizations on behalf of families, with need for an infrastructure in health and social care that supports quality care for dementia.
Smith, Wade P; Kim, Minsun; Holdsworth, Clay; Liao, Jay; Phillips, Mark H
2016-03-11
To build a new treatment planning approach that extends beyond radiation transport and IMRT optimization by modeling the radiation therapy process and prognostic indicators for more outcome-focused decision making. An in-house treatment planning system was modified to include multiobjective inverse planning, a probabilistic outcome model, and a multi-attribute decision aid. A genetic algorithm generated a set of plans embodying trade-offs between the separate objectives. An influence diagram network modeled the radiation therapy process of prostate cancer using expert opinion, results of clinical trials, and published research. A Markov model calculated a quality adjusted life expectancy (QALE), which was the endpoint for ranking plans. The Multiobjective Evolutionary Algorithm (MOEA) was designed to produce an approximation of the Pareto Front representing optimal tradeoffs for IMRT plans. Prognostic information from the dosimetrics of the plans, and from patient-specific clinical variables were combined by the influence diagram. QALEs were calculated for each plan for each set of patient characteristics. Sensitivity analyses were conducted to explore changes in outcomes for variations in patient characteristics and dosimetric variables. The model calculated life expectancies that were in agreement with an independent clinical study. The radiation therapy model proposed has integrated a number of different physical, biological and clinical models into a more comprehensive model. It illustrates a number of the critical aspects of treatment planning that can be improved and represents a more detailed description of the therapy process. A Markov model was implemented to provide a stronger connection between dosimetric variables and clinical outcomes and could provide a practical, quantitative method for making difficult clinical decisions.
Lehman, Wayne E. K.; Simpson, D. Dwayne; Knight, Danica K.; Flynn, Patrick M.
2015-01-01
Sustained and effective use of evidence-based practices in substance abuse treatment services faces both clinical and contextual challenges. Implementation approaches are reviewed that rely on variations of plan-do-study-act (PDSA) cycles, but most emphasize conceptual identification of core components for system change strategies. A 2-phase procedural approach is therefore presented based on the integration of TCU models and related resources for improving treatment process and program change. Phase 1 focuses on the dynamics of clinical services, including stages of client recovery (cross-linked with targeted assessments and interventions), as the foundations for identifying and planning appropriate innovations to improve efficiency and effectiveness. Phase 2 shifts to the operational and organizational dynamics involved in implementing and sustaining innovations (including the stages of training, adoption, implementation, and practice). A comprehensive system of TCU assessments and interventions for client and program-level needs and functioning are summarized as well, with descriptions and guidelines for applications in practical settings. PMID:21443294
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2012 CFR
2012-10-01
... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2011 CFR
2011-10-01
... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
The Implementation of the Bologna Process
ERIC Educational Resources Information Center
Kettunen, Juha; Kantola, Mauri
2006-01-01
This study identifies the responsibilities of the bodies and institutions involved in the implementation of the Bologna Process. They include the levels of Europe, nations, higher education institutions, departments, degree programmes, teachers and students. The future planning is analysed using the Balanced Scorecard approach designed for the…
Nurse-Managed Clinics: A Blueprint for Success Using the Covey Framework.
ERIC Educational Resources Information Center
Starck, Patricia L.; And Others
1995-01-01
Describes the process from inception to successful operation of a university-based, nurse-managed clinic, based on Covey's seven habits of highly effective people. Includes information on the planning process, financing, political strategies for gaining approval, and ongoing development of services. (JOW)
45 CFR 156.265 - Enrollment process for qualified individuals.
Code of Federal Regulations, 2014 CFR
2014-10-01
....265 Section 156.265 Public Welfare Department of Health and Human Services REQUIREMENTS RELATING TO HEALTH CARE ACCESS HEALTH INSURANCE ISSUER STANDARDS UNDER THE AFFORDABLE CARE ACT, INCLUDING STANDARDS RELATED TO EXCHANGES Qualified Health Plan Minimum Certification Standards § 156.265 Enrollment process...
45 CFR 156.265 - Enrollment process for qualified individuals.
Code of Federal Regulations, 2012 CFR
2012-10-01
....265 Section 156.265 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS HEALTH INSURANCE ISSUER STANDARDS UNDER THE AFFORDABLE CARE ACT, INCLUDING STANDARDS RELATED TO EXCHANGES Qualified Health Plan Minimum Certification Standards § 156.265 Enrollment process...
45 CFR 156.1240 - Enrollment process for qualified individuals.
Code of Federal Regulations, 2013 CFR
2013-10-01
....1240 Section 156.1240 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS HEALTH INSURANCE ISSUER STANDARDS UNDER THE AFFORDABLE CARE ACT, INCLUDING STANDARDS RELATED TO EXCHANGES Qualified Health Plan Issuer Responsibilities § 156.1240 Enrollment process for...
45 CFR 156.1240 - Enrollment process for qualified individuals.
Code of Federal Regulations, 2014 CFR
2014-10-01
....1240 Section 156.1240 Public Welfare Department of Health and Human Services REQUIREMENTS RELATING TO HEALTH CARE ACCESS HEALTH INSURANCE ISSUER STANDARDS UNDER THE AFFORDABLE CARE ACT, INCLUDING STANDARDS RELATED TO EXCHANGES Qualified Health Plan Issuer Responsibilities § 156.1240 Enrollment process for...
45 CFR 156.265 - Enrollment process for qualified individuals.
Code of Federal Regulations, 2013 CFR
2013-10-01
....265 Section 156.265 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS HEALTH INSURANCE ISSUER STANDARDS UNDER THE AFFORDABLE CARE ACT, INCLUDING STANDARDS RELATED TO EXCHANGES Qualified Health Plan Minimum Certification Standards § 156.265 Enrollment process...
Tactical resource allocation and elective patient admission planning in care processes.
Hulshof, Peter J H; Boucherie, Richard J; Hans, Erwin W; Hurink, Johann L
2013-06-01
Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and to use resources efficiently. This paper proposes a method to develop a tactical resource allocation and elective patient admission plan. These tactical plans allocate available resources to various care processes and determine the selection of patients to be served that are at a particular stage of their care process. Our method is developed in a Mixed Integer Linear Programming (MILP) framework and copes with multiple resources, multiple time periods and multiple patient groups with various uncertain treatment paths through the hospital, thereby integrating decision making for a chain of hospital resources. Computational results indicate that our method leads to a more equitable distribution of resources and provides control of patient access times, the number of patients served and the fraction of allocated resource capacity. Our approach is generic, as the base MILP and the solution approach allow for including various extensions to both the objective criteria and the constraints. Consequently, the proposed method is applicable in various settings of tactical hospital management.
[Implementation of a rational standard of hygiene for preparation of operating rooms].
Bauer, M; Scheithauer, S; Moerer, O; Pütz, H; Sliwa, B; Schmidt, C E; Russo, S G; Waeschle, R M
2015-10-01
The assurance of high standards of care is a major requirement in German hospitals while cost reduction and efficient use of resources are mandatory. These requirements are particularly evident in the high-risk and cost-intensive operating theatre field with multiple process steps. The cleaning of operating rooms (OR) between surgical procedures is of major relevance for patient safety and requires time and human resources. The hygiene procedure plan for OR cleaning between operations at the university hospital in Göttingen was revised and optimized according to the plan-do-check-act principle due to not clearly defined specifications of responsibilities, use of resources, prolonged process times and increased staff engagement. The current status was evaluated in 2012 as part of the first step "plan". The subsequent step "do" included an expert symposium with external consultants, interdisciplinary consensus conferences with an actualization of the former hygiene procedure plan and the implementation process. All staff members involved were integrated into this management change process. The penetration rate of the training and information measures as well as the acceptance and compliance with the new hygiene procedure plan were reviewed within step "check". The rates of positive swabs and air sampling as well as of postoperative wound infections were analyzed for quality control and no evidence for a reduced effectiveness of the new hygiene plan was found. After the successful implementation of these measures the next improvement cycle ("act") was performed in 2014 which led to a simplification of the hygiene plan by reduction of the number of defined cleaning and disinfection programs for preparation of the OR. The reorganization measures described led to a comprehensive commitment of the hygiene procedure plan by distinct specifications for responsibilities, for the course of action and for the use of resources. Furthermore, a simplification of the plan, a rational staff assignment and reduced process times were accomplished. Finally, potential conflicts due to an insufficient evidence-based knowledge of personnel was reduced. This present project description can be used by other hospitals as a guideline for similar changes in management processes.
Autobiographical Planning and the Brain: Activation and Its Modulation by Qualitative Features.
Spreng, R Nathan; Gerlach, Kathy D; Turner, Gary R; Schacter, Daniel L
2015-11-01
To engage in purposeful behavior, it is important to make plans, which organize subsequent actions. Most studies of planning involve "look-ahead" puzzle tasks that are unrelated to personal goals. We developed a task to assess autobiographical planning, which involves the formulation of personal plans in response to real-world goals, and examined autobiographical planning in 63 adults during fMRI scanning. Autobiographical planning was found to engage the default network, including medial-temporal lobe and midline structures, and executive control regions in lateral pFC and parietal cortex and caudate. To examine how specific qualitative features of autobiographical plans modulate neural activity, we performed parametric modulation analyses. Ratings of plan detail, novelty, temporal distance, ease of plan formulation, difficulty in goal completion, and confidence in goal accomplishment were used as covariates in six hierarchical linear regression models. This modeling procedure removed shared variance among the ratings, allowing us to determine the independent relationship between ratings of interest and trial-wise BOLD signal. We found that specific autobiographical planning, describing a detailed, achievable, and actionable planning process for attaining a clearly envisioned future, recruited both default and frontoparietal brain regions. In contrast, abstract autobiographical planning, plans that were constructed from more generalized semantic or affective representations of a less tangible and distant future, involved interactions among default, sensory perceptual, and limbic brain structures. Specific qualities of autobiographical plans are important predictors of default and frontoparietal control network engagement during plan formation and reflect the contribution of mnemonic and executive control processes to autobiographical planning.
Theoretical orientations in environmental planning: An inquiry into alternative approaches
NASA Astrophysics Data System (ADS)
Briassoulis, Helen
1989-07-01
In the process of devising courses of action to resolve problems arising at the society-environment interface, a variety of planning approaches are followed, whose adoption is influenced by—among other things—the characteristics of environmental problems, the nature of the decision-making context, and the intellectual traditions of the disciplines contributing to the study of these problems. This article provides a systematic analysis of six alternative environmental planning approaches—comprehensive/rational, incremental, adaptive, contingency, advocacy, and participatory/consensual. The relative influence of the abovementioned factors is examined, the occurrence of these approaches in real-world situations is noted, and their environmental soundness and political realism is evaluated. Because of the disparity between plan formulation and implementation and between theoretical form and empirical reality, a synthetic view of environmental planning approaches is taken and approaches in action are identified, which characterize the totality of the planning process from problem definition to plan implementation, as well as approaches in the becoming, which may be on the horizon of environmental planning of tomorrow. The suggested future research directions include case studies to verify and detail the presence of the approaches discussed, developing measures of success of a given approach in a given decision setting, and an intertemporal analysis of environmental planning approaches.
Evidence development and publication planning: strategic process.
Wittek, Michael R; Jo Williams, Mary; Carlson, Angeline M
2009-11-01
A number of decisions in the health care field rely heavily on published clinical evidence. A systematic approach to evidence development and publication planning is required to develop a portfolio of evidence that includes at minimum information on efficacy, safety, durability of effect, quality of life, and economic outcomes. The approach requires a critical assessment of available literature, identification of gaps in the literature, and a strategic plan to fill the gaps to ensure the availability of evidence demanded for clinical decisions, coverage/payment decisions and health technology assessments. The purpose of this manuscript is to offer a six-step strategic process leading to a portfolio of evidence that meets the informational needs of providers, payers, and governmental agencies concerning patient access to a therapy.
Lang, E; Mattson, M
1985-01-01
A structured, goal-oriented format for enhancing the involvement of activity therapy disciplines in the multidisciplinary treatment planning process has been developed in a large private psychiatric teaching hospital. The format, an adaptation of the problem-oriented record, encompasses formal procedures for identifying and recording relevant problems, goals, methods, and objectives for activity therapy treatment. The benefits of this approach include the development of specific, measurable, attainable functional goals; increased accountability in treatment planning and delivery; less time spent in documentation; and education of other staff about the role and function of activities therapy. Patients have a better understanding of their goals and the steps needed to achieve them and show increased participation in the therapy process.
Defining conservation targets on a landscape-scale
Benscoter, A.M.; Romañach, Stephanie; Brandt, Laura A.
2015-01-01
Conservation planning, the process of deciding how to protect, conserve, enhance and(or) minimize loss of natural and cultural resources, is a fundamental process to achieve conservation success in a time of rapid environmental change. Conservation targets, the measurable expressions of desired resource conditions, are an important tool in biological planning to achieve effective outcomes. Conservation targets provide a focus for planning, design, conservation action, and collaborative monitoring of environmental trends to guide landscape-scale conservation to improve the quality and quantity of key ecological and cultural resources. It is essential to have an iterative and inclusive method to define conservation targets that is replicable and allows for the evaluation of the effectiveness of conservation targets over time. In this document, we describe a process that can be implemented to achieve landscape-scale conservation, which includes defining conservation targets. We also describe what has been accomplished to date (September 2015) through this process for the Peninsular Florida Landscape Conservation Cooperative (PFLCC).
The Practice of Health Program Evaluation.
Lewis, Sarah R
2017-11-01
The Practice of Health Program Evaluation provides an overview of the evaluation process for public health programs while diving deeper to address select advanced concepts and techniques. The book unfolds evaluation as a three-phased process consisting of identification of evaluation questions, data collection and analysis, and dissemination of results and recommendations. The text covers research design, sampling methods, as well as quantitative and qualitative approaches. Types of evaluation are also discussed, including economic assessment and systems research as relative newcomers. Aspects critical to conducting a successful evaluation regardless of type or research design are emphasized, such as stakeholder engagement, validity and reliability, and adoption of sound recommendations. The book encourages evaluators to document their approach by developing an evaluation plan, a data analysis plan, and a dissemination plan, in order to help build consensus throughout the process. The evaluative text offers a good bird's-eye view of the evaluation process, while offering guidance for evaluation experts on how to navigate political waters and advocate for their findings to help affect change.
Burbidge, Shaunna K
2010-01-01
US transportation systems have been identified as a problem for public health, as they often encourage automobile transportation and discourage physical activity. This paper provides a case study examination of the Public Health Component of the Wasatch Front Regional Council's Regional Transportation Plan. This plan provides an example of what transportation planners at Utah's largest metropolitan planning organization (MPO) are doing to encourage physical activity through transportation. Existing active living research was used to guide recommendations using a process that included a comprehensive literature review and a review of existing state programs, advisory group and stakeholder meetings, and policy recommendations based on existing local conditions. Stakeholders from a diversity of background and interests came together with one common goal: to improve public health. Based on this collaborative process, nine policy approaches were specifically recommended for approval and integration in the Wasatch Front Regional Transportation Plan. By using current research as a guide and integrating a variety of interests, the Wasatch Front Regional Council is setting a new standard for a collaborative multi-modal focus in transportation planning, which can be replicated nationwide.
The application of Markov decision process in restaurant delivery robot
NASA Astrophysics Data System (ADS)
Wang, Yong; Hu, Zhen; Wang, Ying
2017-05-01
As the restaurant delivery robot is often in a dynamic and complex environment, including the chairs inadvertently moved to the channel and customers coming and going. The traditional path planning algorithm is not very ideal. To solve this problem, this paper proposes the Markov dynamic state immediate reward (MDR) path planning algorithm according to the traditional Markov decision process. First of all, it uses MDR to plan a global path, then navigates along this path. When the sensor detects there is no obstructions in front state, increase its immediate state reward value; when the sensor detects there is an obstacle in front, plan a global path that can avoid obstacle with the current position as the new starting point and reduce its state immediate reward value. This continues until the target is reached. When the robot learns for a period of time, it can avoid those places where obstacles are often present when planning the path. By analyzing the simulation experiment, the algorithm has achieved good results in the global path planning under the dynamic environment.
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda S.; Willoughby, John K.; Gardner, Jo A.; Shinkle, Gerald L.
1993-01-01
In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.
Marshall Space Flight Center Propulsion Systems Department (PSD) KM Initiative
NASA Technical Reports Server (NTRS)
Caraccioli, Paul; Varnadoe, Tom; McCarter, Mike
2006-01-01
NASA Marshall Space Flight Center s Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities with in the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center Of Excellence (AISCE), Intergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KM implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to support the planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have been performed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural/KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level systems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.
NASA Technical Reports Server (NTRS)
Caraccioli, Paul; Varnedoe, Tom; Smith, Randy; McCarter, Mike; Wilson, Barry; Porter, Richard
2006-01-01
NASA Marshall Space Flight Center's Propulsion Systems Department (PSD) is four months into a fifteen month Knowledge Management (KM) initiative to support enhanced engineering decision making and analyses, faster resolution of anomalies (near-term) and effective, efficient knowledge infused engineering processes, reduced knowledge attrition, and reduced anomaly occurrences (long-term). The near-term objective of this initiative is developing a KM Pilot project, within the context of a 3-5 year KM strategy, to introduce and evaluate the use of KM within PSD. An internal NASA/MSFC PSD KM team was established early in project formulation to maintain a practitioner, user-centric focus throughout the conceptual development, planning and deployment of KM technologies and capabilities within the PSD. The PSD internal team is supported by the University of Alabama's Aging Infrastructure Systems Center of Excellence (AISCE), lntergraph Corporation, and The Knowledge Institute. The principle product of the initial four month effort has been strategic planning of PSD KNI implementation by first determining the "as is" state of KM capabilities and developing, planning and documenting the roadmap to achieve the desired "to be" state. Activities undertaken to suppoth e planning phase have included data gathering; cultural surveys, group work-sessions, interviews, documentation review, and independent research. Assessments and analyses have beon pedormed including industry benchmarking, related local and Agency initiatives, specific tools and techniques used and strategies for leveraging existing resources, people and technology to achieve common KM goals. Key findings captured in the PSD KM Strategic Plan include the system vision, purpose, stakeholders, prioritized strategic objectives mapped to the top ten practitioner needs and analysis of current resource usage. Opportunities identified from research, analyses, cultural1KM surveys and practitioner interviews include: executive and senior management sponsorship, KM awareness, promotion and training, cultural change management, process improvement, leveraging existing resources and new innovative technologies to align with other NASA KM initiatives (convergence: the big picture). To enable results based incremental implementation and future growth of the KM initiative, key performance measures have been identified including stakeholder value, system utility, learning and growth (knowledge capture, sharing, reduced anomaly recurrence), cultural change, process improvement and return-on-investment. The next steps for the initial implementation spiral (focused on SSME Turbomachinery) have been identified, largely based on the organization and compilation of summary level engineering process models, data capture matrices, functional models and conceptual-level svstems architecture. Key elements include detailed KM requirements definition, KM technology architecture assessment, - evaluation and selection, deployable KM Pilot design, development, implementation and evaluation, and justifying full implementation (estimated Return-on-Investment). Features identified for the notional system architecture include the knowledge presentation layer (and its components), knowledge network layer (and its components), knowledge storage layer (and its components), User Interface and capabilities. This paper provides a snapshot of the progress to date, the near term planning for deploying the KM pilot project and a forward look at results based growth of KM capabilities with-in the MSFC PSD.
eHealth and IMIA's Strategic Planning Process - IMIA conference introductory address.
Murray, Peter; Haux, Reinhold; Lorenzi, Nancy
2008-01-01
The International Medical Informatics Association (IMIA) is the only organization in health and biomedical informatics which is fully international in scope, bridging the academic, health practice, education, and health industry worlds through conferences, working groups, special interest groups and publications. Authored by the IMIA Interim Vice President for Strategic Planning Implementation and co-authored by the current IMIA President and the IMIA Past-President, the intention of this paper is to introduce IMIA's current strategic planning process and to set this process in relation to 'eHealth: Combining Health Telematics, Telemedicine, Biomedical Engineering and Bioinformatics to the Edge', the theme of this conference. From the viewpoint of an international organization such as IMIA, an eHealth strategy needs to be considered in a comprehensive way, including broadly stimulating high-quality health and biomedical informatics research and education, as well as providing support to bridging outcomes towards a new practice of health care in a changing world.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barr, Jonathan L.; Tuffner, Francis K.; Hadley, Mark D.
This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collectedmore » from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).« less
Wright, Demia Sundra; Anderson, Lynda A; Brownson, Ross C; Gwaltney, Margaret K; Scherer, Jennifer; Cross, Alan W; Goodman, Robert M; Schwartz, Randy; Sims, Tom; White, Carol R
2008-01-01
The Centers for Disease Control and Prevention's (CDC's) Prevention Research Centers (PRC) Program underwent a 2-year evaluation planning project using a participatory process that allowed perspectives from the national community of PRC partners to be expressed and reflected in a national logic model. The PRC Program recognized the challenge in developing a feasible, useable, and relevant evaluation process for a large, diverse program. To address the challenge, participatory and utilization-focused evaluation models were used. Four tactics guided the evaluation planning process: 1) assessing stakeholders' communication needs and existing communication mechanisms and infrastructure; 2) using existing mechanisms and establishing others as needed to inform, educate, and request feedback; 3) listening to and using feedback received; and 4) obtaining adequate resources and building flexibility into the project plan to support multifaceted mechanisms for data collection. Participatory methods resulted in buy-in from stakeholders and the development of a national logic model. Benefits included CDC's use of the logic model for program planning and development of a national evaluation protocol and increased expectations among PRC partners for involvement. Challenges included the time, effort, and investment of program resources required for the participatory approach and the identification of whom to engage and when to engage them for feedback on project decisions. By using a participatory and utilization-focused model, program partners positively influenced how CDC developed an evaluation plan. The tactics we used can guide the involvement of program stakeholders and help with decisions on appropriate methods and approaches for engaging partners.
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
LBNL Laboratory Directed Research and Development Program FY2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ho, D.
2017-03-01
The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.
The Impact of Professional Development on the Quality of the Transition Components of IEPs
ERIC Educational Resources Information Center
Flannery, K. Brigid; Lombardi, Allison; Kato, Mimi McGrath
2015-01-01
Under the Individuals With Disabilities Education Act (IDEA), transition needs and services are to be discussed as part of the Individual Education Program (IEP) planning process, and decisions based on students' future goals are to be documented in the IEP. These transition requirements were included in IDEA in order to plan with the student,…
2012-04-11
labor . The first phase is primarily focused at the community level with education, training, and developing skills. Phase two is a transition to...incorporates design into the framework as the project is identified and reinserted several times in the process, to include toward the end of
ERIC Educational Resources Information Center
Girardelli, Davide; Patel, Vijay K.; Martins-Shannon, Janine
2017-01-01
An extended model based on the theory of planned behaviour (TPB) was used to study Chinese English as a foreign language (EFL) students' in-class participation. The model included the core TPB constructs (behavioural intentions, attitudes, subjective norms, and perceived behavioural control/self-efficacy) and 2 additional constructs (foreign…
ERIC Educational Resources Information Center
Stodden, Robert A.; Boone, Rosalie
1986-01-01
Discusses the role of teachers in providing vocational assessment to disabled students. Steps in this process include (1) establish planning team and conduct information search, (2) define purpose, (3) establish basic considerations, (4) formulate assessment model, (5) establish implementation focus, and (6) pilot test and evaluate assessment…
A Leadership Role for Teacher-Librarians.
ERIC Educational Resources Information Center
Crowley, John
1995-01-01
Discusses the role that teacher-librarians should take in public schools. Highlights include the impact of teacher-librarians on learning outcomes; sexism; administrators' and teachers' views of teacher-librarians; and a strategic planning process, including external and internal scanning, organizational analysis, and vision and mission…
Land Use Management for Solid Waste Programs
ERIC Educational Resources Information Center
Brown, Sanford M., Jr.
1974-01-01
The author discusses the problems of solid waste disposal and examines various land use management techniques. These include the land use plan, zoning, regionalization, land utilities, and interim use. Information concerning solid waste processing site zoning and analysis is given. Bibliography included. (MA)
Efficiency improvements of offline metrology job creation
NASA Astrophysics Data System (ADS)
Zuniga, Victor J.; Carlson, Alan; Podlesny, John C.; Knutrud, Paul C.
1999-06-01
Progress of the first lot of a new design through the production line is watched very closely. All performance metrics, cycle-time, in-line measurement results and final electrical performance are critical. Rapid movement of this lot through the line has serious time-to-market implications. Having this material waiting at a metrology operation for an engineer to create a measurement job plan wastes valuable turnaround time. Further, efficient use of a metrology system is compromised by the time required to create and maintain these measurement job plans. Thus, having a method to develop metrology job plans prior to the actual running of the material through the manufacture area can significantly improve both cycle time and overall equipment efficiency. Motorola and Schlumberger have worked together to develop and test such a system. The Remote Job Generator (RJG) created job plans for new device sin a manufacturing process from an NT host or workstation, offline. This increases available system tim effort making production measurements, decreases turnaround time on job plan creation and editing, and improves consistency across job plans. Most importantly this allows job plans for new devices to be available before the first wafers of the device arrive at the tool for measurement. The software also includes a database manager which allows updates of existing job plans to incorporate measurement changes required by process changes or measurement optimization. This paper will review the result of productivity enhancements through the increased metrology utilization and decreased cycle time associated with the use of RJG. Finally, improvements in process control through better control of Job Plans across different devices and layers will be discussed.
Marine spatial planning in Cyprus
NASA Astrophysics Data System (ADS)
Hadjimitsis, Diofantos; Agapiou, Athos; Mettas, Christodoulos; Themistocleous, Kyriacos; Evagorou, Evagoras; Cuca, Branka; Papoutsa, Christiana; Nisantzi, Argyro; Mamouri, Rodanthi-Elisavet; Soulis, George; Xagoraris, Zafiris; Lysandrou, Vasiliki; Aliouris, Kyriacos; Ioannou, Nicolas; Pavlogeorgatos, Gerasimos
2015-06-01
Marine Spatial Planning (MSP), which is in concept similar to land-use planning, is a public process by which the relevant Member State's authorities analyse and organise human activities in marine areas to achieve ecological, economic and social objectives. MSP aims to promote sustainable growth of maritime economies, sustainable development of marine areas and sustainable use of marine resources. This paper highlights the importance of MSP and provides basic outcomes of the main European marine development. The already successful MSP plans can provide useful feedback and guidelines for other countries that are in the process of implementation of an integrated MSP, such as Cyprus. This paper presents part of the MSP project, of which 80% funded by the European Regional Development Fund (ERDF) and 20% from national contribution. An overview of the project is presented, including data acquisition, methodology and preliminary results for the implementation of MSP in Cyprus.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2013 CFR
2013-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2014 CFR
2014-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2012 CFR
2012-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (h) Automated data processing computer systems, including: (1) Planning efforts in the identification, evaluation, and selection of an automated data processing computer system solution meeting the program... existing automated data processing computer system to support Tribal IV-D program operations, and...
Centralized Alert-Processing and Asset Planning for Sensorwebs
NASA Technical Reports Server (NTRS)
Castano, Rebecca; Chien, Steve A.; Rabideau, Gregg R.; Tang, Benyang
2010-01-01
A software program provides a Sensorweb architecture for alert-processing, event detection, asset allocation and planning, and visualization. It automatically tasks and re-tasks various types of assets such as satellites and robotic vehicles in response to alerts (fire, weather) extracted from various data sources, including low-level Webcam data. JPL has adapted cons iderable Sensorweb infrastructure that had been previously applied to NASA Earth Science applications. This NASA Earth Science Sensorweb has been in operational use since 2003, and has proven reliability of the Sensorweb technologies for robust event detection and autonomous response using space and ground assets. Unique features of the software include flexibility to a range of detection and tasking methods including those that require aggregation of data over spatial and temporal ranges, generality of the response structure to represent and implement a range of response campaigns, and the ability to respond rapidly.
NASA Astrophysics Data System (ADS)
Harris, E.
Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars Reconnaissance Orbiter and Lunar Base construction scenarios. Innovative solutions utilizing Immersive Visualization provide the key to streamlining the mission planning and optimizing engineering design phases of future aerospace missions.
Program evaluation in integrated resource planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Council, C.D.
1994-12-31
The Western Area Power Administration along with the Southwestern and Southeastern Power Administrations joined together to develop a set of integrated resource planning (IRP) tools to help their customers development and implement an IRP process. The project has been entitled the Resource Planning Guide (RPG), and is specifically designed to help small- to mid-sized utilities analyze supply- and demand-side alternatives as part of an IRP process. The RPG project will be available in January 1994 and will include such support as: workshops, technical assistance, an RPG hotline, and an RPG User`s Group for the project. The RPG grew out ofmore » the interest shown by utility customers who wanted a user-friendly tool to aid in their application of the IRP process. The project has been field tested by 43 utilities and related organizations over the last year, has sparked interest both nationally and internationally, and is now available for public use. The program evaluation aspects of the IRP process are heightened by a requirement of the Energy Policy Act of 1992 which requires all long-term power customers of the Western Area Power Administration to develop, implement, and monitor an IRP process. The EPAct defines IRP as: A planning process for new energy resources that evaluates the full range of alternatives, including new generating capacity, power purchases, energy conservation and efficiency, cogeneration and district heating and cooling applications, and renewable energy resources, to provide adequate and reliable service to its electric customers at the lowest system cost. The process takes into account necessary features for system operation, such as diversity, reliability, dispatchability, and other factors of risk; the ability to verify energy savings achieved through energy conservation and efficiency and the projected durability of such savings measured over time; and treats demand and supply resources on a consistent and integrated basis.« less
Simultaneous and Successive Processing in Children with Reading Disability.
ERIC Educational Resources Information Center
Das, J. P.
1984-01-01
Considered are implications for learning disabled students of the simultaneous, successive, and planning (SSP) model, a model of information integration that emphasizes processes rather than ability. Remedial training guidelines are offered, including assessment of learning potential and determination of the nature of the weakness and its…
Print. Outreach Series Paper Number 1.
ERIC Educational Resources Information Center
Assael, Daniel; Trohanis, Pascal
A brief introduction outlines a general print product planning, production, and distribution process which is followed by explanations of 26 print process concepts with references to the ideas of experts in the field. The alphabetically-arranged concepts include audience, brochures, content, disclaimers, editing, format, grammar, halftones, inks,…
An Extension Case Study in Institutional Innovation: Microfinance Intermediary Formation
ERIC Educational Resources Information Center
Edelman, Mark A.
2015-01-01
An institutional innovation process led by Extension created a statewide microfinance intermediary. The intermediary provides business technical assistance and microloans to entrepreneurs having difficulty securing conventional credit but having workable business plans. The process included (1) gathering indicators of a problem; (2) formation of a…
Improvement Guides for I.A. Curriculum
ERIC Educational Resources Information Center
Ritz, John M.; Wright, Lawrence S.
1977-01-01
Describes a project to revise "The Wisconsin Guide to Local Curriculum Improvement in Industrial Education, K-12", originally prepared in 1973. Four figures from the guide are included: (1) model of a field objective, (2) curriculum planning model, (3) instructional development process, and (4) process for developing objectives. (MF)
NASA Technical Reports Server (NTRS)
Milburn, George
1992-01-01
The topics are presented in viewgraph form and include the following: National Center for Appropriate Technology (NCAT) history; technologies selection criteria; strategic plan status; implementation framework; forum composition; NCAT role as integrator; government/industry coordination; identification and selection process for demonstrations; criteria for demonstrations; criteria for non-selection; and future actions.
Developing Federal Clinical Care Recommendations for Women.
Godfrey, Emily M; Tepper, Naomi K; Curtis, Kathryn M; Moskosky, Susan B; Gavin, Loretta E
2015-08-01
The provision of family planning services has important health benefits for the U.S. Approximately 25 million women in the U.S. receive contraceptive services annually and 44 million make at least one family planning-related clinical visit each year. These services are provided by private clinicians, as well as publicly funded clinics, including specialty family planning clinics, health departments, Planned Parenthoods, community health centers, and primary care clinics. Recommendations for providing quality family planning services have been published by CDC and the Office of Population Affairs of the DHHS. This paper describes the process used to develop the women's clinical services portion of the new recommendations and the rationale underpinning them. The recommendations define family planning services as contraceptive care, pregnancy testing and counseling, achieving pregnancy, basic infertility care, sexually transmitted disease services, and preconception health. Because many women who seek family planning services have no other source of care, the recommendations also include additional screening services related to women's health, such as cervical cancer screening. These clinical guidelines are aimed at providing the highest-quality care and are designed to establish a national standard for family planning in the U.S. Published by Elsevier Inc.
Reengineering the project design process
NASA Astrophysics Data System (ADS)
Kane Casani, E.; Metzger, Robert M.
1995-01-01
In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.
Does the Medicare Part D Decision-Making Experience Differ by Rural/Urban Location?
Henning-Smith, Carrie; Casey, Michelle; Moscovice, Ira
2017-01-01
Although much has been written about Medicare Part D enrollment, much less is known about beneficiaries' personal experiences with choosing a Part D plan, especially among rural residents. This study sought to address this gap by examining geographic differences in Part D enrollees' perceptions of the plan decision-making process, including their confidence in their choice, their knowledge about the program, and their satisfaction with available information. We used data from the 2012 Medicare Current Beneficiary Survey and included adults ages 65 and older who were enrolled in Part D at the time of the survey (n = 3,706). We used ordered logistic regression to model 4 outcomes based on beneficiaries' perceptions of the Part D decision-making and enrollment process, first accounting only for differences by rurality, then adjusting for sociodemographic, health, and coverage characteristics. Overall, half of all beneficiaries were not very confident in their Part D knowledge. Rural beneficiaries had lower odds of being confident in the plan they chose and in being satisfied with the amount of information available to them during the decision-making process. After adjusting for all covariates, micropolitan residents continued to have lower odds of being confident in the plan that they chose. Policy-makers should pay particular attention to making information about Part D easily accessible for all beneficiaries and to addressing unique barriers that rural residents have in accessing information while making decisions, such as reduced Internet availability. Furthermore, confidence in the decision-making process may be improved by simplifying the Part D program. © 2016 National Rural Health Association.
The variable polarity plasma arc welding process: Its application to the Space Shuttle external tank
NASA Technical Reports Server (NTRS)
Nunes, A. C., Jr.; Bayless, O. E., Jr.; Jones, C. S., III; Munafo, A. P.; Wilson, W. A.
1983-01-01
The technical history of the variable polarity plasma arc (VPPA) welding process being introduced as a partial replacement for the gas shielded tungsten arc process in assembly welding of the space shuttle external tank is described. Interim results of the weld strength qualification studies, and plans for further work on the implementation of the VPPA process are included.
Dengue Contingency Planning: From Research to Policy and Practice.
Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J; Sánchez Tejeda, Gustavo; Lloyd, Linda S; Hakim, Lokman; Bowman, Leigh R; Horstick, Olaf; Coelho, Giovanini
2016-09-01
Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan.
Naccarella, Lucio; Buchan, James; Newton, Bill; Brooks, Peter
2011-08-01
To review international experience in order to inform Australian PHC workforce policy on the role of primary healthcare organisations (PHCOs/Medicare Locals) in PHC workforce planning. A NZ and UK study tour was conducted by the lead author, involving 29 key informant interviews with regard to PHCOs roles and the effect on PHC workforce planning. Interviews were audio-taped with consent, transcribed and analysed thematically. Emerging themes included: workforce planning is a complex, dynamic, iterative process and key criteria exist for doing workforce planning well; PHCOs lacked a PHC workforce policy framework to do workforce planning; PHCOs lacked authority, power and appropriate funding to do workforce planning; there is a need to align workforce planning with service planning; and a PHC Workforce Planning and Development Benchmarking Database is essential for local planning and evaluating workforce reforms. With the Australian government promoting the role of PHCOs in health system reform, reflections from abroad highlight the key action within PHC and PHCOs required to optimise PHC workforce planning.
2014-01-01
When guidelines are approved by APA, they become association policy, and it is imperative that they remain current. The revision of guidelines poses several challenges to the association. These challenges range from the availability and allocation of resources to support the complicated processes involved in developing and updating these policies to the lack of a clearly defined process that includes identification of tasks, assignments of responsibilities, and so forth. For this reason, the APA Board of Directors asked the Policy and Planning Board (P&P) to work with the boards of the four directorates (i.e., the Education Directorate, the Practice Directorate, the Public Interest Directorate, and the Science Directorate) to create a proposal that would (a) make recommendations with regard to how the review and revision of guidelines documents might best be accomplished in accordance with the APA Strategic Plan and existing policies and procedures and (b) make suggestions regarding the association resources that might be required. The Board of Directors approved the proposed review process in December 2013. 2014 APA, all rights reserved
DOE Office of Scientific and Technical Information (OSTI.GOV)
Preston, Benjamin L; Westaway, Richard M.; Yuen, Emma J.
2011-04-01
Formal planning for climate change adaptation is emerging rapidly at a range of geo-political scales. This first generation of adaptation plans provides useful information regarding how institutions are framing the issue of adaptation and the range of processes that are recognized as being part of an adaptation response. To better understand adaptation planning among developed nations, a set of 57 adaptation plans from Australia, the United Kingdom and the United States was evaluated against a suite of 19 planning processes identified from existing guidance instruments for adaptation planning. Total scores among evaluated plans ranged from 16% of the maximum possiblemore » score to 61%, with an average of 37%. These results suggest adaptation plans are largely under-developed. Critical weaknesses in adaptation planning are related to limited consideration for non-climatic factors as well as neglect for issues of adaptive capacity including entitlements to various forms of capital needed for effective adaptation. Such gaps in planning suggest there are opportunities for institutions to make better use of existing guidance for adaptation planning and the need to consider the broader governance context in which adaptation will occur. In addition, the adaptation options prescribed by adaptation plans reflect a preferential bias toward low-risk capacity-building (72% of identified options) over the delivery of specific actions to reduce vulnerability. To the extent these findings are representative of the state of developed nation adaptation planning, there appear to be significant deficiencies in climate change preparedness, even among those nations often assumed to have the greatest adaptive capacity.« less
NASA Astrophysics Data System (ADS)
Sanchez-Parcerisa, D.; Cortés-Giraldo, M. A.; Dolney, D.; Kondrla, M.; Fager, M.; Carabe, A.
2016-02-01
In order to integrate radiobiological modelling with clinical treatment planning for proton radiotherapy, we extended our in-house treatment planning system FoCa with a 3D analytical algorithm to calculate linear energy transfer (LET) in voxelized patient geometries. Both active scanning and passive scattering delivery modalities are supported. The analytical calculation is much faster than the Monte-Carlo (MC) method and it can be implemented in the inverse treatment planning optimization suite, allowing us to create LET-based objectives in inverse planning. The LET was calculated by combining a 1D analytical approach including a novel correction for secondary protons with pencil-beam type LET-kernels. Then, these LET kernels were inserted into the proton-convolution-superposition algorithm in FoCa. The analytical LET distributions were benchmarked against MC simulations carried out in Geant4. A cohort of simple phantom and patient plans representing a wide variety of sites (prostate, lung, brain, head and neck) was selected. The calculation algorithm was able to reproduce the MC LET to within 6% (1 standard deviation) for low-LET areas (under 1.7 keV μm-1) and within 22% for the high-LET areas above that threshold. The dose and LET distributions can be further extended, using radiobiological models, to include radiobiological effectiveness (RBE) calculations in the treatment planning system. This implementation also allows for radiobiological optimization of treatments by including RBE-weighted dose constraints in the inverse treatment planning process.
Sanchez-Parcerisa, D; Cortés-Giraldo, M A; Dolney, D; Kondrla, M; Fager, M; Carabe, A
2016-02-21
In order to integrate radiobiological modelling with clinical treatment planning for proton radiotherapy, we extended our in-house treatment planning system FoCa with a 3D analytical algorithm to calculate linear energy transfer (LET) in voxelized patient geometries. Both active scanning and passive scattering delivery modalities are supported. The analytical calculation is much faster than the Monte-Carlo (MC) method and it can be implemented in the inverse treatment planning optimization suite, allowing us to create LET-based objectives in inverse planning. The LET was calculated by combining a 1D analytical approach including a novel correction for secondary protons with pencil-beam type LET-kernels. Then, these LET kernels were inserted into the proton-convolution-superposition algorithm in FoCa. The analytical LET distributions were benchmarked against MC simulations carried out in Geant4. A cohort of simple phantom and patient plans representing a wide variety of sites (prostate, lung, brain, head and neck) was selected. The calculation algorithm was able to reproduce the MC LET to within 6% (1 standard deviation) for low-LET areas (under 1.7 keV μm(-1)) and within 22% for the high-LET areas above that threshold. The dose and LET distributions can be further extended, using radiobiological models, to include radiobiological effectiveness (RBE) calculations in the treatment planning system. This implementation also allows for radiobiological optimization of treatments by including RBE-weighted dose constraints in the inverse treatment planning process.
Continuous Energy Improvement in Motor Driven Systems - A Guidebook for Industry
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gilbert A. McCoy and John G. Douglass
2014-02-01
This guidebook provides a step-by-step approach to developing a motor system energy-improvement action plan. An action plan includes which motors should be repaired or replaced with higher efficiency models, recommendations on maintaining a spares inventory, and discussion of improvements in maintenance practices. The guidebook is the successor to DOE’s 1997 Energy Management for Motor Driven Systems. It builds on its predecessor publication by including topics such as power transmission systems and matching driven equipment to process requirements in addition to motors.
McAfee, T
1998-01-01
Implementing a comprehensive approach to decreasing tobacco use in a large health plan requires hard work and commitment on the part of many individuals. We found that major organisational change can be accomplished and sustained. Keys to our success included our decision to remove access barriers to our cessation programmes (including cost); obtaining top leadership buy-in; identifying accountable individuals who owned responsibility for change; measuring key processes and outcomes; and finally keeping at it tenaciously through multiple cycles of improvement.
Climate Risk Informed Decision Analysis: A Hypothetical Application to the Waas Region
NASA Astrophysics Data System (ADS)
Gilroy, Kristin; Mens, Marjolein; Haasnoot, Marjolijn; Jeuken, Ad
2016-04-01
More frequent and intense hydrologic events under climate change are expected to enhance water security and flood risk management challenges worldwide. Traditional planning approaches must be adapted to address climate change and develop solutions with an appropriate level of robustness and flexibility. The Climate Risk Informed Decision Analysis (CRIDA) method is a novel planning approach embodying a suite of complementary methods, including decision scaling and adaptation pathways. Decision scaling offers a bottom-up approach to assess risk and tailors the complexity of the analysis to the problem at hand and the available capacity. Through adaptation pathway,s an array of future strategies towards climate robustness are developed, ranging in flexibility and immediacy of investments. Flexible pathways include transfer points to other strategies to ensure that the system can be adapted if future conditions vary from those expected. CRIDA combines these two approaches in a stakeholder driven process which guides decision makers through the planning and decision process, taking into account how the confidence in the available science, the consequences in the system, and the capacity of institutions should influence strategy selection. In this presentation, we will explain the CRIDA method and compare it to existing planning processes, such as the US Army Corps of Engineers Principles and Guidelines as well as Integrated Water Resources Management Planning. Then, we will apply the approach to a hypothetical case study for the Waas Region, a large downstream river basin facing rapid development threatened by increased flood risks. Through the case study, we will demonstrate how a stakeholder driven process can be used to evaluate system robustness to climate change; develop adaptation pathways for multiple objectives and criteria; and illustrate how varying levels of confidence, consequences, and capacity would play a role in the decision making process, specifically in regards to the level of robustness and flexibility in the selected strategy. This work will equip practitioners and decision makers with an example of a structured process for decision making under climate uncertainty that can be scaled as needed to the problem at hand. This presentation builds further on another submitted abstract "Climate Risk Informed Decision Analysis (CRIDA): A novel practical guidance for Climate Resilient Investments and Planning" by Jeuken et al.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keane, C. J.
2014-01-28
The National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) is operated as a National Nuclear Security Administration (NNSA) user facility in accordance with Department of Energy (DOE) best practices, including peer-reviewed experiments, regular external reviews of performance, and the use of a management structure that facilitates user and stakeholder feedback. NIF facility time is managed using processes similar to those in other DOE science facilities and is tailored to meet the mix of missions and customers that NIF supports. The NIF Governance Plan describes the process for allocating facility time on NIF and for creating the shot schedule.more » It also includes the flow of responsibility from entity to entity. The plan works to ensure that NIF meets its mission goals using the principles of scientific peer review, including transparency and cooperation among the sponsor, the NIF staff, and the various user communities. The NIF Governance Plan, dated September 28, 2012, was accepted and signed by LLNL Director Parney Albright, NIF Director Ed Moses, and Don Cook and Thomas D’Agostino of NNSA. Figure 1 shows the organizational structure for NIF Governance.« less
7 CFR 1291.6 - Completed application.
Code of Federal Regulations, 2014 CFR
2014-01-01
... specialty crops. The State plan shall include the following: (1) Cover page and granting processes. Include... affirmative steps taken to conduct outreach to socially disadvantaged farmers and beginning farmers. Describe... made to either a socially disadvantaged farmer or a beginning farmer. If steps were not taken to...
7 CFR 1291.6 - Completed application.
Code of Federal Regulations, 2012 CFR
2012-01-01
... specialty crops. The State plan shall include the following: (1) Cover page and granting processes. Include... affirmative steps taken to conduct outreach to socially disadvantaged farmers and beginning farmers. Describe... made to either a socially disadvantaged farmer or a beginning farmer. If steps were not taken to...
7 CFR 1291.6 - Completed application.
Code of Federal Regulations, 2013 CFR
2013-01-01
... specialty crops. The State plan shall include the following: (1) Cover page and granting processes. Include... affirmative steps taken to conduct outreach to socially disadvantaged farmers and beginning farmers. Describe... made to either a socially disadvantaged farmer or a beginning farmer. If steps were not taken to...
Configuration Management, Capacity Planning Decision Support, Modeling and Simulation
1988-12-01
flow includes both top-down and bottom-up requirements. The flow also includes hardware, software and transfer acquisition, installation, operation ... management and upgrade as required. Satisfaction of a users needs and requirements is a difficult and detailed process. The key assumptions at this