30 CFR 250.912 - What plans must I submit under the Platform Verification Program?
Code of Federal Regulations, 2012 CFR
2012-07-01
... and major members of concrete-gravity and steel-gravity structures; (2) For jacket and floating... Platforms and Structures Platform Verification Program § 250.912 What plans must I submit under the Platform Verification Program? If your platform, associated structure, or major modification meets the criteria in § 250...
30 CFR 250.912 - What plans must I submit under the Platform Verification Program?
Code of Federal Regulations, 2013 CFR
2013-07-01
... and major members of concrete-gravity and steel-gravity structures; (2) For jacket and floating... Platforms and Structures Platform Verification Program § 250.912 What plans must I submit under the Platform Verification Program? If your platform, associated structure, or major modification meets the criteria in § 250...
30 CFR 250.912 - What plans must I submit under the Platform Verification Program?
Code of Federal Regulations, 2014 CFR
2014-07-01
... and major members of concrete-gravity and steel-gravity structures; (2) For jacket and floating... Platforms and Structures Platform Verification Program § 250.912 What plans must I submit under the Platform Verification Program? If your platform, associated structure, or major modification meets the criteria in § 250...
PLANS; a finite element program for nonlinear analysis of structures. Volume 2: User's manual
NASA Technical Reports Server (NTRS)
Pifko, A.; Armen, H., Jr.; Levy, A.; Levine, H.
1977-01-01
The PLANS system, rather than being one comprehensive computer program, is a collection of finite element programs used for the nonlinear analysis of structures. This collection of programs evolved and is based on the organizational philosophy in which classes of analyses are treated individually based on the physical problem class to be analyzed. Each of the independent finite element computer programs of PLANS, with an associated element library, can be individually loaded and used to solve the problem class of interest. A number of programs have been developed for material nonlinear behavior alone and for combined geometric and material nonlinear behavior. The usage, capabilities, and element libraries of the current programs include: (1) plastic analysis of built-up structures where bending and membrane effects are significant, (2) three dimensional elastic-plastic analysis, (3) plastic analysis of bodies of revolution, and (4) material and geometric nonlinear analysis of built-up structures.
Study on utilization of advanced composites in commercial aircraft wing structures, volume 2
NASA Technical Reports Server (NTRS)
Sakata, I. F.; Ostrom, R. B.
1978-01-01
A plan is defined for a composite wing development effort which will assist commercial transport manufacturers in reaching a level of technology readiness where the utilization of composite wing structure is a cost competitive option for a new aircraft production plan. The recommended development effort consists of two programs: a joint government/industry material development program and a wing structure development program. Both programs are described in detail.
Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knoll, J.M. Jr.
1995-09-01
This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.
Site support program plan for ICF Kaiser Hanford Company
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dieterle, S.E.
1996-09-27
The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.
NASA Technical Reports Server (NTRS)
Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.
1975-01-01
A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-10-01
This document supersedes the previous one, taking into account changes that have taken place in the CFS Science and Technology (S and T) program structure and organization, and in the structure of the Program of Energy Research and Development, the source of funding for CFS bioenergy research. It explains the rationale and overall objective for the bioenergy research program and briefly reviews the accomplishments to date. It indicates the planning context within which the program operates, states the specific objectives for the period of the plan, and details the strategic priorities developed for this period. Finally, it outlines the implementationmore » process for the plan.« less
PLAN2D - A PROGRAM FOR ELASTO-PLASTIC ANALYSIS OF PLANAR FRAMES
NASA Technical Reports Server (NTRS)
Lawrence, C.
1994-01-01
PLAN2D is a FORTRAN computer program for the plastic analysis of planar rigid frame structures. Given a structure and loading pattern as input, PLAN2D calculates the ultimate load that the structure can sustain before collapse. Element moments and plastic hinge rotations are calculated for the ultimate load. The location of hinges required for a collapse mechanism to form are also determined. The program proceeds in an iterative series of linear elastic analyses. After each iteration the resulting elastic moments in each member are compared to the reserve plastic moment capacity of that member. The member or members that have moments closest to their reserve capacity will determine the minimum load factor and the site where the next hinge is to be inserted. Next, hinges are inserted and the structural stiffness matrix is reformulated. This cycle is repeated until the structure becomes unstable. At this point the ultimate collapse load is calculated by accumulating the minimum load factor from each previous iteration and multiplying them by the original input loads. PLAN2D is based on the program STAN, originally written by Dr. E.L. Wilson at U.C. Berkeley. PLAN2D has several limitations: 1) Although PLAN2D will detect unloading of hinges it does not contain the capability to remove hinges; 2) PLAN2D does not allow the user to input different positive and negative moment capacities and 3) PLAN2D does not consider the interaction between axial and plastic moment capacity. Axial yielding and buckling is ignored as is the reduction in moment capacity due to axial load. PLAN2D is written in FORTRAN and is machine independent. It has been tested on an IBM PC and a DEC MicroVAX. The program was developed in 1988.
Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan
NASA Technical Reports Server (NTRS)
Zeidler, Janet
1999-01-01
Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.
Some Methods for Evaluating Program Implementation.
ERIC Educational Resources Information Center
Hardy, Roy A.
An approach to evaluating program implementation is described. This approach includes the development of a project description which includes a structure matrix, sampling from the structure matrix, and preparing an implementation evaluation plan. The implementation evaluation plan should include: (1) verification of implementation of planned…
OCCUPATIONAL EDUCATION--PLANNING AND PROGRAMMING. VOLUME TWO.
ERIC Educational Resources Information Center
KOTZ, ARNOLD
ADDITIONAL POSITION PAPERS BASED ON INFORMATION GATHERED IN THE RECONNAISSANCE SURVEYS OF PLANNING AND PROGRAMING IN OCCUPATIONAL EDUCATION, REPORTED IN VOLUME ONE (VT 005 041), ARE PRESENTED. PART IV, CONCERNED WITH PROGRAM STRUCTURE AND BUDGETING AND THEIR RELATION TO THE PLANNING PROCESS, INCLUDES THE PAPERS--(1) "CURRENT POLICIES AND…
A study on the utilization of advanced composites in commercial aircraft wing structure
NASA Technical Reports Server (NTRS)
Watts, D. J.
1978-01-01
A study was conducted to define the technology and data needed to support the introduction of advanced composite materials in the wing structure of future production aircraft. The study accomplished the following: (1) definition of acceptance factors, (2) identification of technology issues, (3) evaluation of six candidate wing structures, (4) evaluation of five program options, (5) definition of a composite wing technology development plan, (6) identification of full-scale tests, (7) estimation of program costs for the total development plan, (8) forecast of future utilization of composites in commercial transport aircraft and (9) identification of critical technologies for timely program planning.
NASA Technical Reports Server (NTRS)
Wilkinson, W. H.; Kirkhart, F. P.; Kistler, C. W.; Duckworth, W. H.; Ungar, E. W.; Foster, E. L.
1970-01-01
Technical problems of design and flight qualification of the proposed classes of surface insulation materials and leading edge materials were reviewed. A screening test plan, a preliminary design data test plan and a design data test plan were outlined. This program defined the apparent critical differences between the surface insulators and the leading edge materials, structuring specialized screening test plans for each of these two classes of materials. Unique testing techniques were shown to be important in evaluating the structural interaction aspects of the surface insulators and a separate task was defined to validate the test plan. In addition, a compilation was made of available information on proposed material (including metallic TPS), previous shuttle programs, pertinent test procedures, and other national programs of merit. This material was collected and summarized in an informally structured workbook.
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1989-01-01
The Objectives, FY 1989 Plans, Approach, and FY 1989 Milestones for the Structural Mechanics Division's research programs are presented. Fiscal year 1988 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1990-01-01
The Objectives, FY 1990 Plans, Approach, and FY 1990 Milestones for the Structural Mechanics Division's research programs are presented. FY 1989 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Bales, K. S.
1986-01-01
Presented are the Objectives, FY 1986 Plans, Approach, and FY 1986 Milestones for the Structures and Dynamics Division's research programs. FY 1985 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1988-01-01
Presented are the Objectives, FY 1988 Plans, Approach, and FY 1988 Milestones for the Structures and Dynamics Division (Langley Research Center) research programs. FY 1987 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Bales, Kay S.
1987-01-01
This paper presents the Objectives, FY 1987 Plans, Approach, and FY 1987 Milestones for the Structures and Dynamics Division's research programs. FY 1986 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Bales, K. S.
1985-01-01
The objectives, FY 1985 plans, approach, and FY 1985 milestones for the Structures and Dynamics Division's research programs are presented. The FY 1984 accomplishments are presented where applicable. This information is useful in program coordination with other government organizations in areas of mutual interest.
Engineering Technology Programs. Preliminary Curriculum Planning Guide.
ERIC Educational Resources Information Center
Center for Occupational Research and Development, Inc., Waco, TX.
Developed as a resource to assist in a major revision underway in Georgia area technical schools to change curricula for preparing engineering technicians, this preliminary program-planning guide describes curriculum structures for specialized programs in three major areas--electronics, electromechanics, and mechanics. The handbook, which is…
The Charlotte-Mecklenburg Teacher Career Development Program.
ERIC Educational Resources Information Center
Schlechty, Phillip C.; And Others
1985-01-01
Effective training, evaluation, and incentives are key aspects of this school system's six-level career ladder program for teacher development. The three-pronged committee structure for planning and communication and the program's ownership by everyone involved have been vital to its successful planning and development. (DCS)
Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...
Choudhry, Niteesh K; Fischer, Michael A; Smith, Benjamin F; Brill, Gregory; Girdish, Charmaine; Matlin, Olga S; Brennan, Troyen A; Avorn, Jerry; Shrank, William H
2014-03-01
Value-based insurance design (VBID) plans selectively lower cost sharing to increase medication adherence. Existing plans have been structured in a variety of ways, and these variations could influence the effectiveness of VBID plans. We evaluated seventy-six plans introduced by a large pharmacy benefit manager during 2007-10. We found that after we adjusted for the other features and baseline trends, VBID plans that were more generous, targeted high-risk patients, offered wellness programs, did not offer disease management programs, and made the benefit available only for medication ordered by mail had a significantly greater impact on adherence than plans without these features. The effects were as large as 4-5 percentage points. These findings can provide guidance for the structure of future VBID plans.
NASA Year 2000 (Y2K) Program Plan
NASA Technical Reports Server (NTRS)
1998-01-01
NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.
PLANS: A finite element program for nonlinear analysis of structures. Volume 1: Theoretical manual
NASA Technical Reports Server (NTRS)
Pifko, A.; Levine, H. S.; Armen, H., Jr.
1975-01-01
The PLANS system is described which is a finite element program for nonlinear analysis. The system represents a collection of special purpose computer programs each associated with a distinct physical problem class. Modules of PLANS specifically referenced and described in detail include: (1) REVBY, for the plastic analysis of bodies of revolution; (2) OUT-OF-PLANE, for the plastic analysis of 3-D built-up structures where membrane effects are predominant; (3) BEND, for the plastic analysis of built-up structures where bending and membrane effects are significant; (4) HEX, for the 3-D elastic-plastic analysis of general solids; and (5) OUT-OF-PLANE-MG, for material and geometrically nonlinear analysis of built-up structures. The SATELLITE program for data debugging and plotting of input geometries is also described. The theoretical foundations upon which the analysis is based are presented. Discussed are the form of the governing equations, the methods of solution, plasticity theories available, a general system description and flow of the programs, and the elements available for use.
30 CFR 250.913 - When must I resubmit Platform Verification Program plans?
Code of Federal Regulations, 2011 CFR
2011-07-01
... CONTINENTAL SHELF Platforms and Structures Platform Verification Program § 250.913 When must I resubmit Platform Verification Program plans? (a) You must resubmit any design verification, fabrication... 30 Mineral Resources 2 2011-07-01 2011-07-01 false When must I resubmit Platform Verification...
30 CFR 250.913 - When must I resubmit Platform Verification Program plans?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Structures Platform Verification Program § 250.913 When must I resubmit Platform Verification Program plans? (a) You must resubmit any design verification, fabrication verification, or installation verification... 30 Mineral Resources 2 2010-07-01 2010-07-01 false When must I resubmit Platform Verification...
Agricultural Mechanics: Program Planning Guide: Volume 3.
ERIC Educational Resources Information Center
Bristol, Benton K.
The program planning guide for agricultural mechanics was written to assist Applied Biological and Agricultural Occupations (ABAO) teachers in enriching existing programs and/or to provide the basis for expansion of offerings to include additional materials for the cluster areas of agricultural power and machinery, structural and conveniences,…
NASA Technical Reports Server (NTRS)
2002-01-01
The purpose of this document is to present the strategic plan and associated organizational structure that the National Space Biomedical Research Institute (NSBRI) will utilize to achieve the defined mission and objectives provided by NASA. Much of the information regarding the background and establishment of the NSBRI by NASA has been provided in other documentation and will not be repeated in this Strategic Plan. This Strategic Plan is presented in two volumes. Volume I (this volume) begins with an Introduction (Section 2) that provides the Institute's NASA-defined mission and objectives, and the organizational structure adopted to implement these through three Strategic Programs: Countermeasure Research; Education, Training and Outreach; and Cooperative Research and Development. These programs are described in Sections 3 to 5. Each program is presented in a similar way, using four subsections: Goals and Objectives; Current Strategies; Gaps and Modifications; and Resource Requirements. Section 6 provides the administrative infrastructure and total budget required to implement the Strategic Programs and assures that they form a single cohesive plan. This plan will ensure continued success of the Institute for the next five years. Volume II of the Strategic Plan provides an in-depth analysis of the current and future strategic programs of the 12 current NSBRI teams, including their goals, objectives, mutual interactions and schedules.
The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan
NASA Technical Reports Server (NTRS)
Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.
1981-01-01
The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.
ERIC Educational Resources Information Center
Rehfeldt, Jason D.; Clark, Gary M.; Lee, Steven W.
2012-01-01
This study examined two areas. First, the authors looked at whether secondary individualized education program (IEP) teams who used the "Transition Planning Inventory" (TPI) in conjunction with a structured IEP meeting that based discussions and decisions on TPI data as a planning intervention generated significantly more…
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Accola, Anne L.; Keith, Bryant
1989-01-01
The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.
Solid earth science in the 1990s. Volume 1: Program plan
NASA Technical Reports Server (NTRS)
1991-01-01
This is volume one of a three volume series. A plan for solid earth science research for the next decade is outlined. The following topics are addressed: scientific requirements; status of current research; major new emphasis in the 1990's; interagency and international participation; and the program implementation plan. The following fields are represented: plate motion and deformation; lithospheric structure and evolution; volcanology; land surface (processes of change); earth structure and dynamics; earth rotation and reference frames; and geopotential fields. Other topics of discussion include remote sensing, space missions, and space techniques.
Automated generation of weld path trajectories.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sizemore, John M.; Hinman-Sweeney, Elaine Marie; Ames, Arlo Leroy
2003-06-01
AUTOmated GENeration of Control Programs for Robotic Welding of Ship Structure (AUTOGEN) is software that automates the planning and compiling of control programs for robotic welding of ship structure. The software works by evaluating computer representations of the ship design and the manufacturing plan. Based on this evaluation, AUTOGEN internally identifies and appropriately characterizes each weld. Then it constructs the robot motions necessary to accomplish the welds and determines for each the correct assignment of process control values. AUTOGEN generates these robot control programs completely without manual intervention or edits except to correct wrong or missing input data. Most shipmore » structure assemblies are unique or at best manufactured only a few times. Accordingly, the high cost inherent in all previous methods of preparing complex control programs has made robot welding of ship structures economically unattractive to the U.S. shipbuilding industry. AUTOGEN eliminates the cost of creating robot control programs. With programming costs eliminated, capitalization of robots to weld ship structures becomes economically viable. Robot welding of ship structures will result in reduced ship costs, uniform product quality, and enhanced worker safety. Sandia National Laboratories and Northrop Grumman Ship Systems worked with the National Shipbuilding Research Program to develop a means of automated path and process generation for robotic welding. This effort resulted in the AUTOGEN program, which has successfully demonstrated automated path generation and robot control. Although the current implementation of AUTOGEN is optimized for welding applications, the path and process planning capability has applicability to a number of industrial applications, including painting, riveting, and adhesive delivery.« less
Development of a verification program for deployable truss advanced technology
NASA Technical Reports Server (NTRS)
Dyer, Jack E.
1988-01-01
Use of large deployable space structures to satisfy the growth demands of space systems is contingent upon reducing the associated risks that pervade many related technical disciplines. The overall objectives of this program was to develop a detailed plan to verify deployable truss advanced technology applicable to future large space structures and to develop a preliminary design of a deployable truss reflector/beam structure for use a a technology demonstration test article. The planning is based on a Shuttle flight experiment program using deployable 5 and 15 meter aperture tetrahedral truss reflections and a 20 m long deployable truss beam structure. The plan addresses validation of analytical methods, the degree to which ground testing adequately simulates flight and in-space testing requirements for large precision antenna designs. Based on an assessment of future NASA and DOD space system requirements, the program was developed to verify four critical technology areas: deployment, shape accuracy and control, pointing and alignment, and articulation and maneuvers. The flight experiment technology verification objectives can be met using two shuttle flights with the total experiment integrated on a single Shuttle Test Experiment Platform (STEP) and a Mission Peculiar Experiment Support Structure (MPESS). First flight of the experiment can be achieved 60 months after go-ahead with a total program duration of 90 months.
Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-11-01
This is the November 2014 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.
Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2015-03-01
This is the March 2015 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...
NASA Technical Reports Server (NTRS)
Horsham, Gary A. P.
1992-01-01
This report presents a strategic analysis and implementation plan for NASA's Office of Commercial Programs (OCP), Technology Transfer Division's (TTD), Technology Transfer Program. The main objectives of this study are to: (1) characterize the NASA TTD's environment and past organizational structure; (2) clearly identify current and prospective programmatic efforts; (3) determine an evolutionary view of an organizational structure which could lead to the accomplishment of NASA's future technology transfer aims; and (4) formulate a strategy and plan to improve NASA's (and other federal agencies) ability to transfer technology to the non-aerospace sectors of the U.S. economy. The planning horizon for this study extends through the remainder of the 1990s to the year 2000.
Commercial jet transport crashworthiness
NASA Technical Reports Server (NTRS)
Widmayer, E.; Brende, O. B.
1982-01-01
The results of a study to identify areas of research and approaches that may result in improved occupant survivability and crashworthiness of transport aircraft are given. The study defines areas of structural crashworthiness for transport aircraft which might form the basis for a research program. A 10-year research and development program to improve the structural impact resistance of general aviation and commercial jet transport aircraft is planned. As part of this program parallel studies were conducted to review the accident experience of commercial transport aircraft, assess the accident performance of structural components and the status of impact resistance technology, and recommend areas of research and development for that 10-year plan. The results of that study are also given.
Coordinated Home Care Training Manual.
ERIC Educational Resources Information Center
Michigan Univ., Ann Arbor. Home Care Training Center.
This manual is intended as a source of information and assistance in the planning, organization, implementation, and evaluation of home care programs. There are ten major sections: (1) Introduction (review of the history of home care and definition of pertinent terms), (2) Program Planning, (3) Organizational Structure, (4) Coordination and…
Measurement Plan for the Characterization of the Load Environment for Cross Ties and Fasteners
DOT National Transportation Integrated Search
1977-04-01
This report was prepared as a part of the Improved Track Structures Research Program sponsored by the Office of Rail Safety Research of the Federal Railroad Administration. The report is a planning document for a track measurement program to obtain d...
INDOT Technical Training Plan : Appendix B
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix M
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix P
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix F
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix H
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix E
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix O
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix J
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix L
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix A
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix D
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix K
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix G
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix I
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix N
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix C
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
40 CFR 300.205 - Planning and coordination structure.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SUPERFUND, EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES... appropriate federal, state, and local officials to enhance the contingency planning of those officials and to assure pre-planning of joint response efforts, including appropriate procedures for mechanical recovery...
Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle
DOE Office of Scientific and Technical Information (OSTI.GOV)
Millard, W. David; Johnson, Daniel M.; Henderson, John M.
2014-07-28
Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedbackmore » during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.« less
LSS systems planning and performance program
NASA Technical Reports Server (NTRS)
Mckenna, Victoria Jones; Dendy, Michael J.; Naumann, Charles B.; Rice, Sally A.; Weathers, John M.
1993-01-01
This report describes, using viewgraphs, the Marshall Space Flight Center's Large Space Structures Ground Test Facilities located in building 4619. Major topics include the Active Control Evaluation of Systems (ACES) Laboratory; the Control-Structures Interaction/Controls, Astrophysics, and Structures Experiment in Space (CSI/CASES); Advanced Development Facility; and the ACES Guest Investigator Program.
Field tests of a participatory ergonomics toolkit for Total Worker Health
Kernan, Laura; Plaku-Alakbarova, Bora; Robertson, Michelle; Warren, Nicholas; Henning, Robert
2018-01-01
Growing interest in Total Worker Health® (TWH) programs to advance worker safety, health and well-being motivated development of a toolkit to guide their implementation. Iterative design of a program toolkit occurred in which participatory ergonomics (PE) served as the primary basis to plan integrated TWH interventions in four diverse organizations. The toolkit provided start-up guides for committee formation and training, and a structured PE process for generating integrated TWH interventions. Process data from program facilitators and participants throughout program implementation were used for iterative toolkit design. Program success depended on organizational commitment to regular design team meetings with a trained facilitator, the availability of subject matter experts on ergonomics and health to support the design process, and retraining whenever committee turnover occurred. A two committee structure (employee Design Team, management Steering Committee) provided advantages over a single, multilevel committee structure, and enhanced the planning, communication, and team-work skills of participants. PMID:28166897
Structures and Dynamics Division research and technology plans, fiscal year, 1981
NASA Technical Reports Server (NTRS)
Bales, K. S.
1981-01-01
The objectives, expected results, approach, and FY 81 milestones for the Structures and Dynamics Division's research program are presented. This information will be useful in program coordination with other government organizations in areas of mutual interest.
South Dakota ITS/CVO business plan : final business plan
DOT National Transportation Integrated Search
1998-01-18
This report defines an Intelligent Transportation Systems/Commercial Vehicle Operations (ITS/CVO) program for the State of South Dakota. Structured as a business plan, the document includes the following components: 1) description of the current CVO ...
1989-07-01
incorporated into the sys- Kotler88 tem. Several interesting concepts are presented, but Kotler , P. Marketing Planning: Analysis, Planning, the bulk of the...Metzger87 Mantei, M. "The Effect of Programming Team Metzger, Philip W. Managing Programming Structures on Programming Tasks." Comm. ACM People: A Personal... Philips . Software Engi- Classic approach in organization theory. neering. Englewood Cliffs, N.J.: Prentice-Hall, 1988. Shannon75 An industrial approach
2006-07-26
FY2008. Although the Navy’s proposed force of 31 amphibious ships includes 10 LPD-17 class ships, the Navy is planning to end LPD-17 procurement in...expresses concerns about the planned reduction in amphibious ships, the sea basing concept, and the MPF(F) program, and requires a report on sea basing...Ship Force Structure Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Sea Basing Concept of Operations
An Economic History of Medicare Part C
Mcguire, Thomas G; Newhouse, Joseph P; Sinaiko, Anna D
2011-01-01
Context: Twenty-five years ago, private insurance plans were introduced into the Medicare program with the stated dual aims of (1) giving beneficiaries a choice of health insurance plans beyond the fee-for-service Medicare program and (2) transferring to the Medicare program the efficiencies and cost savings achieved by managed care in the private sector. Methods: In this article we review the economic history of Medicare Part C, known today as Medicare Advantage, focusing on the impact of major changes in the program's structure and of plan payment methods on trends in the availability of private plans, plan enrollment, and Medicare spending. Additionally, we compare the experience of Medicare Advantage and of employer-sponsored health insurance with managed care over the same time period. Findings: Beneficiaries' access to private plans has been inconsistent over the program's history, with higher plan payments resulting in greater choice and enrollment and vice versa. But Medicare Advantage generally has cost more than the traditional Medicare program, an overpayment that has increased in recent years. Conclusions: Major changes in Medicare Advantage's payment rules are needed in order to simultaneously encourage the participation of private plans, the provision of high-quality care, and to save Medicare money. PMID:21676024
Population and population policy in Pakistan.
Mauldin, W P
1963-02-01
Pakistan is a divided country with different religious groups represented. Since independence in 1941, the Muslim population has increased more rapidly than the Hindu population, the West Pakistan population more rapidly and steadily than the East Pakistan population. In the late 1950s the Pakistan government initiated a family planning program. The program has trained medical and paramedical personnel in family planning, added family planning services to existing medical centers, planned for a National Research Institute of Family Planning, employed mobile units to reach outlying areas, conducted limited clinical studies on some contraceptives, and used mass media advertising. Only India and Japan are doing more with government-sponsored family planning. A weak organizational structure and an inadequate number of trained personnel are the main weakness of the program. It is too early to assess the success of the program. A 10-point reduction in annual birth rates will be considered successful.
Advanced rotorcraft technology: Task force report
NASA Technical Reports Server (NTRS)
1978-01-01
The technological needs and opportunities related to future civil and military rotorcraft were determined and a program plan for NASA research which was responsive to the needs and opportunities was prepared. In general, the program plan places the primary emphasis on design methodology where the development and verification of analytical methods is built upon a sound data base. The four advanced rotorcraft technology elements identified are aerodynamics and structures, flight control and avionic systems, propulsion, and vehicle configurations. Estimates of the total funding levels that would be required to support the proposed program plan are included.
NOAA Office of Exploration and Research > About OER > Program Review
Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan Media News Room OER Symposium Overview Organization Guiding Documents Organizational Structure Map of Program Review Home About OER Overview Organization Guiding Documents Organizational Structure Map of
NOAA Office of Exploration and Research > Education > NOAA Initiatives
Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan Evaluation Education NOAA Initiatives Home About OER Overview Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan 2014 Funding Opportunities Contact Us Program
NOAA Office of Exploration and Research > Education > Alliance Partners
Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan Evaluation Education Alliance Partners Home About OER Overview Organization Guiding Documents Organizational Structure Map of Staff and Affiliate Locations Strategic Plan 2014 Funding Opportunities Contact Us Program
External Review of GPS LifePlan
ERIC Educational Resources Information Center
Arendale, David R.
2008-01-01
The GPS LifePlan is an interactive resource that helps students succeed in reaching their career, education and personal goals. GPS stands for "GOALS + PLANS = SUCCESS". http://gpslifeplan.org This holistic academic and student development program provides a structure for students to define their goals and helps them establish plans to…
41 CFR 105-8.150-4 - Transition plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Transition plan. 105-8... Transition plan. In the event that structural changes to facilities will be undertaken to achieve program accessibility, the agency shall develop, by March 9, 1992; the transition plan setting forth the steps necessary...
40 CFR 300.1 - Purpose and objectives.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY... Substances Pollution Contingency Plan (NCP) is to provide the organizational structure and procedures for...
Communication Electronics. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This packet contains a program guide and Career Merit Achievement Plan (Career MAP) for the implementation of a communication electronics (communications technician) program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, lists job titles under the…
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1994-01-01
The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Smith, Jacqueline G.; Gardner, James E.
1990-01-01
The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
Program Costing with the CAMPUS Simulation Model. Project PRIME Report, Number 5.
ERIC Educational Resources Information Center
Cordes, David C.
The first section of this report on program costing with the CAMPUS simulation discusses the structuring process of Program Planning and Budgeting (PPB) systems, and emphasizes the ideas, rules, and principles for structuring resource data that have evolved during the 10 years of PPB existence. It also discusses the WICHE-PMS program…
Basic Gasoline Engine Mechanics. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This packet contains a program guide and Career Merit Achievement Plan (Career MAP) for the implementation of a basic gasoline engine mechanics program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, lists job titles under the program, and includes a…
Consumer Electronic Product Servicing. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This packet contains a program guide and Career Merit Achievement Plan (Career MAP) for the implementation of a consumer electronic product servicing program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, lists job titles under the program, and includes…
Computer Integrated Manufacturing. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This packet contains a program guide and Career Merit Achievement Plan (Career MAP) for the implementation of a computer-integrated manufacturing program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, lists job titles under the program, and includes a…
Computer Engineering Technology. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This packet contains a program guide and Career Merit Achievement Plan (Career MAP) for the implementation of a computer engineering technology program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, lists job titles under the program, and includes a…
Computer Electronics. Florida Vocational Program Guide.
ERIC Educational Resources Information Center
University of South Florida, Tampa. Dept. of Adult and Vocational Education.
This packet contains a program guide and Career Merit Achievement Plan (Career MAP) for the implementation of a computer electronics technology (computer service technician) program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, lists job titles under…
40 CFR 7.75 - Transition plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...
40 CFR 7.75 - Transition plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...
40 CFR 7.75 - Transition plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...
40 CFR 7.75 - Transition plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.
NASA Technical Reports Server (NTRS)
1984-01-01
The structure of the program, the five priority levels, the drive routines, the stepwise drive plan, the figure routines, meander X and y, the range of measurement table, the optimization of figure drive, the figure drive plan, dialogue routines, stack processing, the drive for the main terminal, the protocol routines, the drive for the microterminal, the drive for the experiment computer, and the main program are discussed.
Rural Community Resources as a Guidance Tool: An Action Plan.
ERIC Educational Resources Information Center
Robinson, Graydon, Ed.
The Community Centered School Support Program, also known as the Bingham Project, is not a new idea but rather a more structured application of an old concept. The plan assists small rural schools with inadequate guidance funds to establish a career information program at a minimum cost using the community, a heretofore untapped resource. The…
Field tests of a participatory ergonomics toolkit for Total Worker Health.
Nobrega, Suzanne; Kernan, Laura; Plaku-Alakbarova, Bora; Robertson, Michelle; Warren, Nicholas; Henning, Robert
2017-04-01
Growing interest in Total Worker Health ® (TWH) programs to advance worker safety, health and well-being motivated development of a toolkit to guide their implementation. Iterative design of a program toolkit occurred in which participatory ergonomics (PE) served as the primary basis to plan integrated TWH interventions in four diverse organizations. The toolkit provided start-up guides for committee formation and training, and a structured PE process for generating integrated TWH interventions. Process data from program facilitators and participants throughout program implementation were used for iterative toolkit design. Program success depended on organizational commitment to regular design team meetings with a trained facilitator, the availability of subject matter experts on ergonomics and health to support the design process, and retraining whenever committee turnover occurred. A two committee structure (employee Design Team, management Steering Committee) provided advantages over a single, multilevel committee structure, and enhanced the planning, communication, and teamwork skills of participants. Copyright © 2016 Elsevier Ltd. All rights reserved.
The Integration of English Language Development and Science Instruction in Elementary Classrooms
NASA Astrophysics Data System (ADS)
Zwiep, Susan Gomez; Straits, William J.; Stone, Kristin R.; Beltran, Dolores D.; Furtado, Leena
2011-12-01
This paper explores one district's attempt to implement a blended science and English Language Development (ELD) elementary program, designed to provide English language learners opportunities to develop proficiency in English through participation in inquiry-based science. This process resulted in blended program that utilized a combined science/ELD lesson plan format to structure and guide teachers' efforts to use science as the context for language development. Data, collected throughout the first 2 years of the program, include teacher-generated lesson plans, observation notes, and interviews with teachers and principals. The process by which the blended program was developed, the initial implementation of the program, the resulting science/ELD lesson plan format, and teachers' perceptions about the program and its impact on their students are described.
The NASA land processes program - Status and future directions
NASA Technical Reports Server (NTRS)
Murphy, R. E.
1984-01-01
For most of the past decade, NASA focused its efforts on the immediate exploitation of space-based sensors in earth-oriented programs. After an assessment of the current situation with respect to the conducted programs, NASA has restructured its earth-oriented programs to concentrate on the scientific use of its satellites while other agencies and private enterprise have assumed responsibility for programs of interest to them. In making this change of direction, NASA has conducted a series of studies to obtain information as a basis for its planning activities regarding future programs. Attention is given to a plan for Land Global Habitability, the development of a basic structure for the land program, a program plan for global biology, and a study on the role of biochemical cycles. The three major facets of the land processes program are discussed along with some examples of current work.
Using planned adaptation to implement evidence-based programs with new populations.
Lee, Shawna J; Altschul, Inna; Mowbray, Carol T
2008-06-01
The Interactive Systems Framework (ISF) for Dissemination and Implementation (Wandersman et al. 2008) elaborates the functions and structures that move evidence-based programs (EBPs) from research to practice. Inherent in that process is the tension between implementing programs with fidelity and the need to tailor programs to fit the target population. We propose Planned Adaptation as one approach to resolve this tension, with the goal of guiding practitioners in adapting EBPs so that they maintain core components of program theory while taking into account the needs of particular populations. Planned Adaptation is a form of capacity building within the Prevention Support System that provides a framework to guide practitioners in adapting programs while encouraging researchers to provide information relevant to adaptation as a critical aspect of dissemination research, with the goal of promoting wider dissemination and better implementation of EBPs. We illustrate Planned Adaptation using the JOBS Program (Caplan et al. 1989), which was developed for recently laid-off, working- and middle-class workers and subsequently implemented with welfare recipients.
IEC planning: eight state-of-the-art principles.
Middleton, J
1983-12-01
Considerable experience and research has been accumulated in the last 20 years on the ways in which information/education/communication (IEC) programs can be effectively designed, implemented, and evaluated. Possibly more effort has focused on population and family planning IEC than on any other sectoral program of development communication. Several principles have emerged which, taken together, define the state of the art in the field. These principles provide a framework of experience which can guide the development of comprehensive IEC programs. They include: policy and resource assessment; audience analysis; strategy design; message research and pretesting; participation and feedback; management; evaluation; and collaboration. The nature of the national policy base for population and family planning programs will determine the goals and approaches of the IEC program. Strong policies of limitation on popultion growth lead to equally strong and pervasive IEC efforts designed to directly affect contraceptive behavior. Assessment of existing policy is an essential aspect of the design of an effective IEC program. Policies establish the rationale and boundaries for action. Population and family planning programs are concerned with some of the most intimate human behavior. Consequently, structured and sensitive audience analysis has become an integral part of the design of IEC programs. The design of communication strategy requires clearly stated objectives. Principles of human learning are used to structure information appropriately. Message research and pretesting have become integral components of the strategy design process. Small scale research on specific objectives is necessary to establish the basis for message design. Audience participation and feedback in remaining phases of program development and implementation are important. The management of an IEC program requires a specific combination of planning, flexibility, and creativity. Evaluation of program effects--identification of the degree of change toward stated objectives -- is critical to long term assessment of the underlying strategy and the identification both of needed corrections and new directions for the future. Collaboration with and involvement of stakeholders in the design and implementation of a national IEC program significantly raises the probability that support will be forthcoming. Taken together these 8 principles can become the basic building blocks of an effective population/family planning IEC program.
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda S.; Shinkle, Gerald L.; Weiler, Jerry D.; Willoughby, John K.
1990-01-01
This paper presents a planning approach to the Space Station Freedom program which takes into account the widely distributed nature of that program. The program management structure is organized into three major levels: a strategic level, a tactical level, and an execution level. For each level, resource availabilities are determined, the resources are distributed, schedules are built independently within the resource limits, the schedules are integrated into a single schedule, and conflicts are resolved by negotiating requirements and/or relaxing contraints. This approach distributes resources to multiple planning entities in such a way that when the multiple plans are collected, they fit together with minimal modification. The up-front distribution is planned in such a way and to a sufficient degree that a fit is virtually assured.
NASA Technical Reports Server (NTRS)
1980-01-01
A research program plan developed by the Office of Space and Terrestrial Applications to provide guidelines for a concentrated effort to improve the understanding of the measurement capabilities of active microwave imaging sensors, and to define the role of such sensors in future Earth observations programs is outlined. The focus of the planned activities is on renewable and non-renewable resources. Five general application areas are addressed: (1) vegetation canopies, (2) surface water, (3) surface morphology, (4) rocks and soils, and (5) man-made structures. Research tasks are described which, when accomplished, will clearly establish the measurement capabilities in each area, and provide the theoretical and empirical results needed to specify and justify satellite systems using imaging radar sensors for global observations.
Cajanding, Ruff Joseph
Cardiovascular diseases remain the leading cause of morbidity and mortality among Filipinos and are responsible for a very large number of hospital readmissions. Comprehensive discharge planning programs have demonstrated positive benefits among various populations of patients with cardiovascular disease, but the clinical and psychosocial effects of such intervention among Filipino patients with acute myocardial infarction (AMI) have not been studied. In this study we aimed to determine the effectiveness of a nurse-led structured discharge planning program on perceived functional status, cardiac self-efficacy, patient satisfaction, and unexpected hospital revisits among Filipino patients with AMI. A true experimental (randomized control) 2-group design with repeated measures and data collected before and after intervention and at 1-month follow-up was used in this study. Participants were assigned to either the control (n = 68) or the intervention group (n = 75). Intervention participants underwent a 3-day structured discharge planning program implemented by a cardiovascular nurse practitioner, which is comprised of a series of individualized lecture-discussion, provision of feedback, integrative problem solving, goal setting, and action planning. Control participants received standard routine care. Measures of functional status, cardiac self-efficacy, and patient satisfaction were measured at baseline; cardiac self-efficacy and patient satisfaction scores were measured prior to discharge, and perceived functional status and number of revisits were measured 1 month after discharge. Participants in the intervention group had significant improvement in functional status, cardiac self-efficacy, and patient satisfaction scores at baseline and at follow-up compared with the control participants. Furthermore, participants in the intervention group had significantly fewer hospital revisits compared with those who received only standard care. The results demonstrate that a nurse-led structured discharge planning program is an effective intervention in improving perceived functional health status, cardiac self-efficacy, and patient satisfaction, while reducing the number of unexpected hospital revisits, among Filipino patients with AMI. It is recommended that this intervention be incorporated in the optimal care of patients being discharged with an AMI.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ganapin, D.J. Jr.
1987-01-01
Integrated environmental planning was analyzed using the case of the Palawan Integrated Environmental Program in the Philippines. The study explores the relationship between development and environmental planning and evaluates the importance of organizational coordination and timing in the integration of these two concerns. Factors affecting the accomplishment of the objectives of integrated environmental planning were also studied. Two planning phases of the Palawan Integrated Environmental Program were observed using the case study approach. Observations of various planning participants-consultants, middle level agency personnel, heads of local agencies-were also considered. The integration of environmental considerations in development planning was found to bemore » beneficial to both environmental and development concerns. The experience showed that such integration requiring tight organizational coordination and the proper timing of activities and outputs. The success of the Palawan Integrated Environmental Program was also found to depend on effective communication, the political functionality of the government, the leadership of its executives, the presence of appropriate structures of authority, sufficiency of funds and manpower and the availability of appropriate environmental planning techniques. Recommendations are provided to further strengthen the integration of environmental considerations in development planning and increase the effectiveness of integrated environmental programs.« less
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1993-01-01
The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
County Clustering for the California 4-H Youth Development Program: Impacts and Lessons Learned
ERIC Educational Resources Information Center
Subramaniam, Aarti; Dasher, Harry Steve; Young, Jane Chin
2012-01-01
In response to budgetary constraints, a new staffing structure, the Pilot Leadership Plan, was proposed for California's 4-H Youth Development Program. County clusters were formed, each led by a coordinator. The plan was piloted for 2 years to provide insight into how county clustering could support Extension staff to increase and enhance program…
OSFA Goals and Objectives System: Strategies for Improved Program Planning and Management.
ERIC Educational Resources Information Center
Advanced Technology, Inc., Reston, VA.
The purpose and function of the Goals and Objectives System of the U.S. Office of Student Financial Assistance (OSFA) are discussed. Results of a review of the system, policy issues, and a strategy for improving the system in OSFA program planning and management are also addressed. The system identifies a structure for work activities in OSFA and…
Bioenergy Technologies Office Multi-Year Program Plan: July 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2014-07-09
This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-28
... Service 7 CFR Part 1207 [Document Number AMS-FV-13-0027] Potato Research and Promotion Plan; Amend the... from the Potato Research and Promotion Plan. The Plan is administered by the Board with oversight by...: http://www.regulations.gov or to the Promotion and Economics Division, Fruit and Vegetable Program, AMS...
10 CFR 4.550 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Program accessibility: Existing facilities. 4.550 Section 4.550 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR...) Transition plan. In the event that structural changes to facilities will be undertaken to achieve program...
10 CFR 4.550 - Program accessibility: Existing facilities.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Program accessibility: Existing facilities. 4.550 Section 4.550 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR...) Transition plan. In the event that structural changes to facilities will be undertaken to achieve program...
Rani, Manju; Nusrat, Sharmin; Hawken, Laura H
2012-10-16
Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions- institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms.Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as 'program management and implementation' entities rather than as lead 'technical advisory' bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. The 'technical functions' and 'implementation and management functions' should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH.The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs.
2012-01-01
Background Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Methods Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions— institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Results Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms. Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as ‘program management and implementation’ entities rather than as lead ‘technical advisory’ bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. Conclusions The ‘technical functions’ and ‘implementation and management functions’ should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH. The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs. PMID:23067232
PLANiTS : structuring and supporting the intelligent transportation systems planning process
DOT National Transportation Integrated Search
1997-01-01
PLANiTS (Planning and Analysis Integration for Intelligent Transportation Systems) is a process-based computer system that supports a series of mutually interdependent steps progressing toward developing and programming transportation improvement pro...
ERIC Educational Resources Information Center
Academy for Educational Development, 2006
2006-01-01
This "Developing Service Plans" guide is a tool to assist grantees in the development of written service plans. It provides a structure that can be tailored to meet the needs of individual grantees. Services Plans are a management tool for planning, organizing and implementing Head Start program services to children and families. As stated in the…
Training Program for Emergency Medical Technician: Dispatcher. 2--Instructor Lesson Plans.
ERIC Educational Resources Information Center
National Highway Traffic Safety Administration (DOT), Washington, DC.
Intended to assist instructors who wish to conduct a training course for emergency medical technicians (EMTs) serving as dispatchers, this document contains detailed lesson plans organized to structure course presentations. Each lesson plan includes the following elements: unit objectives; suggestions for adapting the lessons to local policies and…
The Development of Kidney Stone Dietary Plans for Patient Education
ERIC Educational Resources Information Center
Dennison, Darwin; Mayo, M. Leah; Abraham, Victor E.
2011-01-01
Currently patient education programs and urology practices provide individuals with "lists of foods to avoid" for dietary management of kidney stones. However, "planned diets" that include daily meal plans and recipes provide structure and specificity for diet management and are preferred by many individuals. This article describes the development…
A Guide for Planning Indoor Facilities for College Physical Education.
ERIC Educational Resources Information Center
Crawford, Wayne H.
Following a general consideration of the functional aspects of planning facilities and the relationship between program and facilities, a detailed presentation is made of planning buildings for college and university indoor physical education activities. Recommendations are made with regard to design, structural and functional features of…
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
A survey of experiments and experimental facilities for active control of flexible structures
NASA Technical Reports Server (NTRS)
Sparks, Dean W., Jr.; Horner, Garnett C.; Juang, Jer-Nan; Klose, Gerhard
1989-01-01
A brief survey of large space structure control related experiments and facilities was presented. This survey covered experiments performed before and up to 1982, and those of the present period (1982-...). Finally, the future planned experiments and facilities in support of the control-structure interaction (CSI) program were reported. It was stated that new, improved ground test facilities are needed to verify the new CSI design techniques that will allow future space structures to perform planned NASA missions.
Medical Applications of the PHITS Code (3): User Assistance Program for Medical Physics Computation.
Furuta, Takuya; Hashimoto, Shintaro; Sato, Tatsuhiko
2016-01-01
DICOM2PHITS and PSFC4PHITS are user assistance programs for medical physics PHITS applications. DICOM2PHITS is a program to construct the voxel PHITS simulation geometry from patient CT DICOM image data by using a conversion table from CT number to material composition. PSFC4PHITS is a program to convert the IAEA phase-space file data to PHITS format to be used as a simulation source of PHITS. Both of the programs are useful for users who want to apply PHITS simulation to verification of the treatment planning of radiation therapy. We are now developing a program to convert dose distribution obtained by PHITS to DICOM RT-dose format. We also want to develop a program which is able to implement treatment information included in other DICOM files (RT-plan and RT-structure) as a future plan.
Beich, Jeff; Scanlon, Dennis P; Ulbrecht, Jan; Ford, Eric W; Ibrahim, Ibrahim A
2006-02-01
To date, pay-for-performance programs targeting the care of persons with chronic conditions have primarily been directed at physicians and provide an alternative to health plan-sponsored chronic disease management (DM) programs. Both approaches require similar infrastructure, and each has its own advantages and disadvantages for program implementation. Pay-for-performance programs use incentives based on patient outcomes; however, an alternative system might incorporate measures of structure and process. Using a conceptual framework, the authors explore the variation in 50 diabetes DM programs using data from the 2002 National Business Coalition on Health's eValue8 Request for Information (RFI). The authors raise issues relevant to the assignment of accountability for patient outcomes to either health plans or physicians. They analyze the association between RFI scores measuring structures and processes, and HEDIS diabetes intermediate outcome measures. Finally, the strengths and weaknesses of using the RFI scores as an alternative metric for pay-for-performance programs are discussed.
NASA Technical Reports Server (NTRS)
Wynne, Eleanor C.
1992-01-01
The work under each technical area is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest. The structural dynamics division consist of the following branches: configuration aeroelasticity; unsteady aerodynamics; aeroservoelasticity; landing and impact dynamics; and spacecraft dynamics.
Ramseur, Priscilla; Fuchs, Mary Ann; Edwards, Pamela; Humphreys, Janice
2018-01-01
Preparing future nursing leaders to be successful is important because many current leaders will retire in large numbers in the future. A structured nursing leadership development program utilizing the Essentials of Nurse Manager Orientation online program provided future nursing leaders with content aligned with nursing leadership competencies. Paired with assigned mentors and monthly leadership sessions, the participants increased their perception of leadership competence.
Manpower Goals Planning and Accountability. Research Report 34.
ERIC Educational Resources Information Center
Niehaus, R. J.; Nitterhouse, D.
Based on previous application of goal programming models to manpower goals planning for large organizations, this paper structures the extensions from the planning process to the operations and control aspects of the management cycle. Emphasis is on the accountability necessary to make such a system an effective management control tool. In order…
Establishing an Environmental Scanning System to Augment College and University Planning.
ERIC Educational Resources Information Center
Morrison, James L.
A plan to establish an environmental scanning and forecasting system for colleges and universities is discussed as a way to maximize long-range planning. After proposing a program structure, attention is directed to methods of gaining organizational acceptance, developing a comprehensive taxonomy with an electronic filing system, identifying and…
DOE Office of Scientific and Technical Information (OSTI.GOV)
EMAM, M; Eldib, A; Lin, M
2014-06-01
Purpose: An in-house Monte Carlo based treatment planning system (MC TPS) has been developed for modulated electron radiation therapy (MERT). Our preliminary MERT planning experience called for a more user friendly graphical user interface. The current work aimed to design graphical windows and tools to facilitate the contouring and planning process. Methods: Our In-house GUI MC TPS is built on a set of EGS4 user codes namely MCPLAN and MCBEAM in addition to an in-house optimization code, which was named as MCOPTIM. Patient virtual phantom is constructed using the tomographic images in DICOM format exported from clinical treatment planning systemsmore » (TPS). Treatment target volumes and critical structures were usually contoured on clinical TPS and then sent as a structure set file. In our GUI program we developed a visualization tool to allow the planner to visualize the DICOM images and delineate the various structures. We implemented an option in our code for automatic contouring of the patient body and lungs. We also created an interface window displaying a three dimensional representation of the target and also showing a graphical representation of the treatment beams. Results: The new GUI features helped streamline the planning process. The implemented contouring option eliminated the need for performing this step on clinical TPS. The auto detection option for contouring the outer patient body and lungs was tested on patient CTs and it was shown to be accurate as compared to that of clinical TPS. The three dimensional representation of the target and the beams allows better selection of the gantry, collimator and couch angles. Conclusion: An in-house GUI program has been developed for more efficient MERT planning. The application of aiding tools implemented in the program is time saving and gives better control of the planning process.« less
[Thinking about several problems of the research of our family planning strategy].
Shi, H
1989-03-01
On the basis of 1982 census data, it is estimated that from 1987-1997 13 million women will enter the age of marriage and child-bearing each year. The tasks of keeping the population size around 1.2 billion by the year 2000 is arduous. Great efforts have to be made to continue encouraging one child/couple, and to pursue the current plans and policies and maintain strict control over fertility. Keeping population growth in pace with economic growth, environment, ecological balance, availability of per capita resources, education programs, employment capability, health services, maternal and child care, social welfare and social security should be a component of the long term development strategy of the country. Family planning is a comprehensive program which involves long cycles and complicated factors, viewpoints of expediency in guiding policy and program formulation for short term benefits are inappropriate. The emphasis of family planning program strategy should be placed on the rural areas where the majority of population reside. Specifically, the major aspects of strategic thrusts should be the linkage between policy implementation and reception, between family planning publicity and changes of ideation on fertility; the integrated urban and rural program management relating to migration and differentiation of policy towards minority population and areas in different economic development stages. In order to achieve the above strategies, several measures are proposed. (1) strengthening family planning program and organization structure; (2) providing information on population and contraception; (3) establishing family planning program network for infiltration effects; (4) using government financing, taxation, loan, social welfare and penalty to regulate fertility motivations; (5) improving the system of target allocation and data reporting to facilitate program implementation; (6) strengthening population projection and policy research; (7) and strengthening training of family planning personnel to improve program efficiency.
Health and safety programs for art and theater schools.
McCann, M
2001-01-01
A wide variety of health and safety hazards exist in schools and colleges of art and theater due to a lack of formal health and safety programs and a failure to include health and safety concerns during planning of new facilities and renovation of existing facilities. This chapter discusses the elements of a health and safety program as well as safety-related structural and equipment needs that should be in the plans for any school of art or theater. These elements include curriculum content, ventilation, storage, housekeeping, waste management, fire and explosion prevention, machine and tool safety, electrical safety, noise, heat stress, and life safety and emergency procedures and equipment. Ideally, these elements should be incorporated into the plans for any new facilities, but ongoing programs can also benefit from a review of existing health and safety programs.
Mentoring in Higher Education Administration
ERIC Educational Resources Information Center
Kutchner, Wendy; Kleschik, Paul
2016-01-01
Structured mentoring programs provide established goals and objectives and clarify expectations and access for the mentee. Institutions often tailor these programs to meet their cultural and leadership needs, guiding the mentee in their current position and future growth opportunities. Such internal programs assist with succession planning and…
2009 DOE Vehicle Technologies Program Annual Merit Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2009-10-01
Annual Merit Review and Peer Evaluation Meeting to review the FY2008 accomplishments and FY2009 plans for the Vehicle Technologies Program, and provide an opportunity for industry, government, and academic to give inputs to DOE on the Program with a structured and formal methodology.
ERIC Educational Resources Information Center
Bender, Lloyd D.; And Others
Effective rural development planning depends on facts and analysis based, not on rural averages, but on the diverse social and economic structure of rural America. Programs tailored to particular types of rural economies may be more effective than generalized programs. Because of their unique characteristics, government policies and economic…
Revised U.S. Climate Science Plan Still Lacking in Key Areas
NASA Astrophysics Data System (ADS)
Showstack, Randy
2004-03-01
A U.S. National Research Council committee has found that a revised strategic plan for the U.S. Climate Change Science Program (CCSP) includes elements ``that could permit it to effectively guide research on climate and associated global changes over the next decades.'' However, the committee noted that the revision, issued by the CCSP, faces major hurdles related to funding, program priorities, management structure, and maintaining political independence.
Monajjemzadeh, Farnaz; Shokri, Javad; Mohajel Nayebi, Ali Reza; Nemati, Mahboob; Azarmi, Yadollah; Charkhpour, Mohammad; Najafi, Moslem
2014-01-01
Purpose: This study was aimed to design Objective Structured Field Examination (OSFE) and also standardize the course plan of community pharmacy clerkship at Pharmacy Faculty of Tabriz University of Medical Sciences (Iran). Methods: The study was composed of several stages including; evaluation of the old program, standardization and implementation of the new course plan, design and implementation of OSFE, and finally results evaluation. Results: Lack of a fair final assessment protocol and proper organized educating system in various fields of community pharmacy clerkship skills were assigned as the main weaknesses of the old program. Educational priorities were determined and student’s feedback was assessed to design the new curriculum consisting of sessions to fulfill a 60-hour training course. More than 70% of the students were satisfied and successfulness and efficiency of the new clerkship program was significantly greater than the old program (P<0.05). In addition, they believed that OSFE was a suitable testing method. Conclusion: The defined course plan was successfully improved different skills of the students and OSFE was concluded as a proper performance based assessment method. This is easily adoptable by pharmacy faculties to improve the educational outcomes of the clerkship course. PMID:24511477
A Class to Prepare Students to Manage Educational Debt.
ERIC Educational Resources Information Center
Popik, Roberta S.; And Others
1986-01-01
A counseling program prepared for Georgetown University School of Dentistry is described. It trains students in concepts associated with short- and long-term financial planning, banking relationships, credit, business planning and structuring debt into an individual student's lifestyle. (MLW)
Puerto Rico water resources planning model program description
Moody, D.W.; Maddock, Thomas; Karlinger, M.R.; Lloyd, J.J.
1973-01-01
Because the use of the Mathematical Programming System -Extended (MPSX) to solve large linear and mixed integer programs requires the preparation of many input data cards, a matrix generator program to produce the MPSX input data from a much more limited set of data may expedite the use of the mixed integer programming optimization technique. The Model Definition and Control Program (MODCQP) is intended to assist a planner in preparing MPSX input data for the Puerto Rico Water Resources Planning Model. The model utilizes a mixed-integer mathematical program to identify a minimum present cost set of water resources projects (diversions, reservoirs, ground-water fields, desalinization plants, water treatment plants, and inter-basin transfers of water) which will meet a set of future water demands and to determine their sequence of construction. While MODCOP was specifically written to generate MPSX input data for the planning model described in this report, the program can be easily modified to reflect changes in the model's mathematical structure.
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1982-04-01
The ORNL Fossil Energy Materials Program Office compiles and issues this combined quarterly progress report from camera-ready copies submitted by each of the participating subcontractor organizations. This report of activities on the program is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1982-1986 in which projects are organized according to fossil energy technologies. This report is divided into parts and chapters with each part describing projects related to a particular fossil energy technology. Chapters within a part provide details of the various projects associated with that technology.more » We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program. Plans for the program will be issued annually. A draft of the program plan for FY 1982 to 1986 has been prepared and is in the review process. The implementation of these plans will be reflected by these quarterly progress reports, and this dissemination of information will bw augmented by topical or final reports as appropriate.« less
Implementation of a new advanced graduate education program in oral implantology.
Gallucci, German O; Weber, Hans Peter; Kalenderian, Elsbeth
2012-10-01
The academic program for the Harvard School of Dental Medicine's Advanced Graduate Program in Oral Implantology is based on scientific evidence applied to educational quality, translational research, patient care, and service. The objective of the program is to enable highly motivated individuals with proven scholarship and excellence in patient care to achieve academic leadership in the clinical and scientific fields of implant dentistry and tissue regeneration. A detailed curriculum describing the academic program, as well as a business plan (which included a management plan describing the organizational structure, financial implications, and market forces) and implementation and communication plans, were developed before moving forward. With careful academic and business planning, the result was a vibrant implant program, in which all placements and restorations of implants are coordinated with regard to practice management. The program is integrated into the existing clinical care model and has been financially self-sustaining from its inception. Six students have participated in the last two years. On average, each student performed seventy-nine procedures on twenty-nine patients, generating over $46,000 in production. The curriculum includes didactics, hands-on clinical learning, and research activities. Research is a critical component as well. The results demonstrate that the time taken to develop a detailed curriculum and business plan for a new academic program, which anticipated and resolved potential barriers to success, was instrumental in the successful implementation of an oral implantology residency program.
Schelbe, Lisa; Randolph, Karen A; Yelick, Anna; Cheatham, Leah P; Groton, Danielle B
2018-01-01
Increased attention to former foster youth pursuing post-secondary education has resulted in the creation of college campus based support programs to address their need. However, limited empirical evidence and theoretical knowledge exist about these programs. This study seeks to describe the application of systems theory as a framework for examining a college campus based support program for former foster youth. In-depth semi-structured interviews were conducted with 32 program stakeholders including students, mentors, collaborative members, and independent living program staff. Using qualitative data analysis software, holistic coding techniques were employed to analyze interview transcripts. Then applying principles of extended case method using systems theory, data were analyzed. Findings suggest systems theory serves as a framework for understanding the functioning of a college campus based support program. The theory's concepts help delineate program components and roles of stakeholders; outline boundaries between and interactions among stakeholders; and identify program strengths and weakness. Systems theory plays an important role in identifying intervention components and providing a structure through which to identify and understand program elements as a part of the planning process. This study highlights the utility of systems theory as a framework for program planning and evaluation.
[Evaluation of the implementation of reproductive health services in Maringá, Paraná State, Brazil].
Nagahama, Elizabeth Eriko Ishida
2009-01-01
The aim of this study was to develop a tool to evaluate the implementation of a contraceptive program in health services and apply it to the 23 public health services in Maringá, Paraná State, Brazil. A theoretical-logical model was developed, corresponding to a 'target image' for the family planning program. Using the Delphi technique and consensus conference, six experts validated the program's target image, which included three dimensions and 60 evaluation criteria. A data collection instrument was prepared, in addition to a spreadsheet to evaluate the degree of the family planning program's implementation, constituting the Questionnaire for the Evaluation of Reproductive Health Services. The vast majority of the primary health units (91.3%) received an 'intermediate' score on implementation of the family planning program, while 8.7% were classified as 'incipient' and none were scored as 'advanced'. The 'advanced' degree of implementation in the structural dimension contrasted with the organizational and patient care dimensions. The instrument can be useful for evaluating reproductive health programs and is applicable to the health services planning and management processes.
[Plan to improve malaria control towards its elimination in Mesoamerica].
Rodríguez, Mario Henry; Betanzos-Reyes, Angel Francisco
2011-01-01
To develop a plan to strengthen the control of malaria towards its elimination. In 2009, under the coordination of the National Public HealthInstitute ofMexico, atransdisciplinary equipment of technical and operative experts was conformed to carry out a situational analysis of malaria and control programs and for the selection of effective practices of intervention that would be incorporated to the plan, within the framework of an exercise in Theory of Change. Criteria for thestratificationof thelocalities, based ontheirtransmission characteristics were established. The structural and operative limitations of the control programs were identified. A plan of interventions was elaborated to improve the coverage of epidemiological surveillance, anti-malaria interventions and opportune diagnosis and treatment of cases. The plan delineates progressive phases of implementation: reorganization, intensification of interventions and evaluation of elimination feasibility. The adoption of a regional strategic plan will provide guidance and administrative elements to conform a system that coordinates the activities of the national control programs and facilitate the elimination of malaria in the region.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).
30 CFR 250.912 - What plans must I submit under the Platform Verification Program?
Code of Federal Regulations, 2010 CFR
2010-07-01
... computer programs used in the design process; and (3) A summary of the major design considerations and the...) Structural tolerances; (ii) Welding procedures; (iii) Material (concrete, gravel, or silt) placement methods...
Space research and technology overview
NASA Technical Reports Server (NTRS)
Reck, Gregory M.
1992-01-01
A series of viewgraphs are presented that describe NASA's space research and technology activities. The following areas are covered: NASA organizational structure, overall program/mission objectives, program elements and milestones, planning and resources, accomplishments, and the role of NASA Centers.
N Reactor Deactivation Program Plan. Revision 4
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walsh, J.L.
1993-12-01
This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directivemore » to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.« less
NASA Technical Reports Server (NTRS)
Ary, A.; Axtell, C.; Fogg, L.; Jackson, A.; James, A. M.; Mosesian, B.; Vanderwier, J.; Vanhamersveld, J.
1976-01-01
The empennage component selected for this program is the vertical fin box of the L-1011 aircraft. The box structure extends from the fuselage production joint to the tip rib and includes the front and rear spars. Various design options were evaluated to arrive at a configuration which would offer the highest potential for satisfying program objectives. The preferred configuration selected consists of a hat-stiffened cover with molded integrally stiffened spars, aluminum trussed composite ribs, and composite miniwich web ribs with integrally molded caps. Material screening tests were performed to select an advanced composite material system for the Advanced Composite Vertical Fin (ACFV) that would meet the program requirements from the standpoint of quality, reproducibility, and cost. Preliminary weight and cost analysis were made, targets established, and tracking plans developed. These include FAA certification, ancillary test program, quality control, and structural integrity control plans.
Plastic and Large-Deflection Analysis of Nonlinear Structures
NASA Technical Reports Server (NTRS)
Thomson, R. G.; Hayduk, R. J.; Robinson, M. P.; Durling, B. J.; Pifko, A.; Levine, H. S.; Armen, H. J.; Levy, A.; Ogilvie, P.
1982-01-01
Plastic and Large Deflection Analysis of Nonlinear Structures (PLANS) system is collection of five computer programs for finite-element static-plastic and large deflection analysis of variety of nonlinear structures. System considers bending and membrane stresses, general three-dimensional bodies, and laminated composites.
NASA Astrophysics Data System (ADS)
Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.
2017-11-01
Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.
Large space systems technology, 1981. [conferences
NASA Technical Reports Server (NTRS)
Boyer, W. J. (Compiler)
1982-01-01
A total systems approach including structures, analyses, controls, and antennas is presented as a cohesive, programmatic plan for large space systems. Specifically, program status, structures, materials, and analyses, and control of large space systems are addressed.
NASA Technical Reports Server (NTRS)
Irwin, Daniel
2010-01-01
Goal 1: Enhance Applications Research Advance the use of NASA Earth science in policy making, resource management and planning, and disaster response. Key Actions: Identify priority needs, conduct applied research to generate innovative applications, and support projects that demonstrate uses of NASA Earth science. Goal 2: Increase Collaboration Establish a flexible program structure to meet diverse partner needs and applications objectives. Key Actions: Pursue partnerships to leverage resources and risks and extend the program s reach and impact. Goal 3:Accelerate Applications Ensure that NASA s flight missions plan for and support applications goals in conjunction with their science goals, starting with mission planning and extending through the mission life cycle. Key Actions: Enable identification of applications early in satellite mission lifecycle and facilitate effective ways to integrate end-user needs into satellite mission planning
Guidelines for Vocational Education Program in Nebraska Public Schools.
ERIC Educational Resources Information Center
Nebraska State Dept. of Education, Lincoln. Div. of Vocational Education.
The publication serves as a supplement to the Nebraska State plan of vocational education and outlines detailed directions that are needed for a more comprehensive treatment of program development and operational procedures. The report is structured in seven sections: (1) general provisions; (2) financial participation; (3) educational programs in…
NASA Technical Reports Server (NTRS)
Messinger, Ross
2008-01-01
An assessment was performed to identify the applicability of composite material technologies to major structural elements of the NASA Constellation program. A qualitative technology assessment methodology was developed to document the relative benefit of 24 structural systems with respect to 33 major structural elements of Ares I, Orion, Ares V, and Altair. Technology maturity assessments and development plans were obtained from more than 30 Boeing subject matter experts for more than 100 technologies. These assessment results and technology plans were combined to generate a four-level hierarchy of recommendations. An overarching strategy is suggested, followed by a Constellation-wide development plan, three integrated technology demonstrations, and three focused projects for a task order follow-on.
A Technology Plan for Enabling Commercial Space Business
NASA Technical Reports Server (NTRS)
Lyles, Garry M.
1997-01-01
The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program is a customer driven, focused technology program that supports the NASA Strategic Plan and considers future commercial space business projections. The initial cycle of the Advanced Space Transportation Program implementation planning was conducted from December 1995 through February 1996 and represented increased NASA emphasis on broad base technology development with the goal of dramatic reductions in the cost of space transportation. The second planning cycle, conducted in January and February 1997, updated the program implementation plan based on changes in the external environment, increased maturity of advanced concept studies, and current technology assessments. The program has taken a business-like approach to technology development with a balanced portfolio of near, medium, and long-term strategic targets. Strategic targets are influenced by Earth science, space science, and exploration objectives as well as commercial space markets. Commercial space markets include those that would be enhanced by lower cost transportation as well as potential markets resulting in major increases in space business induced by reductions in transportation cost. The program plan addresses earth-to-orbit space launch, earth orbit operations and deep space systems. It also addresses all critical transportation system elements; including structures, thermal protection systems, propulsion, avionics, and operations. As these technologies are matured, integrated technology flight experiments such as the X-33 and X-34 flight demonstrator programs support near-term (one to five years) development or operational decisions. The Advanced Space Transportation Program and the flight demonstrator programs combine business planning, ground-based technology demonstrations and flight demonstrations that will permit industry and NASA to commit to revolutionary new space transportation systems beginning at the turn of the century and continuing far into the future.
Aeronautics Research and Technology Program and specific objectives, fiscal year 1982
NASA Technical Reports Server (NTRS)
Olstad, W. B.
1981-01-01
The Aeronautics Research and Technology program is broken down into two program areas (research and technology base, and systems technology programs) which are further broken down into succeedingly more detailed activities to form a work breakdown structure for the aeronautics program: program area, program/discipline objective, specific objective, and research and technology objective and plan (RTOP). A detailed view of this work breakdown structure down to the specific objective level is provided, and goals or objectives at each of these levels are set forth. What is to be accomplished and why are addressed, but not how. The letter falls within the domain of the RTOP.
NASA Astrophysics Data System (ADS)
Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.
2008-07-01
In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.
How economic development and family planning programs combined to reduce Indonesian fertility.
Gertler, P J; Molyneaux, J W
1994-02-01
This paper examines the contributions of family planning programs, economic development, and women's status to Indonesian fertility decline from 1982 to 1987. Methodologically we unify seemingly conflicting demographic and economic frameworks into a single "structural" proximate-cause model as well as controlling statistically for the targeted (nonrandom) placement of family planning program inputs. The results are consistent with both frameworks: 75% of the fertility decline resulted from increased contraceptive use, but was induced primarily through economic development and improved education and economic opportunities for females. Even so, the dramatic impact of the changes in demand-side factors (education and economic development) on contraceptive use was possible only because there already existed a highly responsive contraceptive supply delivery system.
Guidelines for development of structural integrity programs for DOE high-level waste storage tanks
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bandyopadhyay, K.; Bush, S.; Kassir, M.
Guidelines are provided for developing programs to promote the structural integrity of high-level waste storage tanks and transfer lines at the facilities of the Department of Energy. Elements of the program plan include a leak-detection system, definition of appropriate loads, collection of data for possible material and geometric changes, assessment of the tank structure, and non-destructive examination. Possible aging degradation mechanisms are explored for both steel and concrete components of the tanks, and evaluated to screen out nonsignificant aging mechanisms and to indicate methods of controlling the significant aging mechanisms. Specific guidelines for assessing structural adequacy will be provided inmore » companion documents. Site-specific structural integrity programs can be developed drawing on the relevant portions of the material in this document.« less
NASA Technical Reports Server (NTRS)
Bales, K. S.
1984-01-01
The Objectives, Expected Results, Approach, and Fiscal Year FY 1984 Milestones for the Structures and Dynamics Division's research programs are examined. The FY 1983 Accomplishments are presented where applicable.
Anderson, R W
1986-09-01
A formal, hospitalwide strategic-planning process provides structure for the pharmacy's plans for implementing clinical services. The state-supported clinical cancer and research center began a formal strategic-planning process in 1981. The institution's planning report, prepared every two years and covering three two-year periods, drives the institution's budget through the state's biennial budget process. The report focuses on each department's responsibilities, areas of service, and relationship to the mission of the institution. Through the long-range planning process, upper-level administrators learned that pharmacy was eager not only to provide high-volume drug distribution services but also to assume direct patient-care and research responsibilities. This prompted an organizational change for pharmacy from a hospital department to a clinical division. The division of pharmacy now consists of three professional departments (patient care, pharmacy research, and pharmacy academic programs) and an administrative support service area. Services offered by each of the three departments are discussed, along with specific initiatives planned for the years 1987-1993. Within the next few years, all managers will come from the ranks of clinical practitioners; nonpharmacists will oversee financial and human resource functions. The division encourages existing pharmacy staff members to enhance their clinical skills through staff development programs. Strategic planning serves the dual purposes of structuring plans for implementing clinical pharmacy services and communicating pharmacy's goals within the institution.
NASA Astrophysics Data System (ADS)
Fish, Philip E.
1995-05-01
In 1978, Wisconsin Department of Transportation discovered major cracking on a two-girder, fracture critical structure, just four years after it was constructed. In 1981, on the same structure, now seven years old, major cracking was discovered in the tie girder flange of the tied arch span. This is one example of the type of failures that transportation departments discovered on welded structures in the 1970's and '80's. The failures from welded details and pinned connections lead to much stricter standards for present day designs. All areas were affected: design with identification of fatigue-prone details and classification of fatigue categories; material requirements with emphasis on toughness and weldability; increased welding and fabrication standards with licensure of fabrication shops to minimum quality standards including personnel; and an increased effort on inspection of existing bridges, where critical details were overlooked or missed in the past. FHWA inspection requirements for existing structures increased through this same time period, in reaction to the failures that had occurred. Obviously, many structures in Wisconsin were not built to the standards now required, thus the importance for quality inspection techniques. The new FHWA inspection requirements now being implemented throughout the nation require an in-depth, hands-on type inspection at a specified frequency, on all fracture critical structures. Wisconsin Department of Transportation started an in-depth inspection program in 1985 and made it a full time program in 1987. This program included extensive nondestructive testing. Ultrasonic inspection has played a major role in this type of inspection. All fracture critical structures, pin and hanger systems, and pinned connections are inspected on a five-year cycle now. The program requires an experienced inspection team and a practical inspection approach. Extensive preparation is required with review of all design, construction, and maintenance documents. An inspection plan is developed from the review and downloaded to a laptop computer. Inspection emphasis are on 'hands on' visual and nondestructive evaluation. Report documentation includes all design plans, pictorial documentation of structural deficiencies, nondestructive evaluation reports, conclusions, and recommendations. Planned changes in the program include implementation of an engineering work station as a 'single source' information file and reporting file for the inspection program. This would include scanning all current information into the file such as design, construction, and maintenance history. It would also include all inspection data with pictures. Inspections would be performed by downloading data onto a laptop and then uploading after completion of inspection. Pictures and nondestructive data would be entered by digital disks.
Solar power satellite system definition study, phase 2.
NASA Technical Reports Server (NTRS)
1979-01-01
A program plan for the Solar Power Satellite Program is presented. The plan includes research, development, and evaluation phase, engineering and development and cost verification phase, prototype construction, and commercialization. Cost estimates and task requirements are given for the following technology areas: (1) solar arrays; (2) thermal engines and thermal systems; (3) power transmission (to earth); (4) large space structures; (5) materials technology; (6) system control; (7) space construction; (8) space transportation; (9) power distribution, and space environment effects.
Probabilistic structural analysis methods for space transportation propulsion systems
NASA Technical Reports Server (NTRS)
Chamis, C. C.; Moore, N.; Anis, C.; Newell, J.; Nagpal, V.; Singhal, S.
1991-01-01
Information on probabilistic structural analysis methods for space propulsion systems is given in viewgraph form. Information is given on deterministic certification methods, probability of failure, component response analysis, stress responses for 2nd stage turbine blades, Space Shuttle Main Engine (SSME) structural durability, and program plans. .
AIA SCHOOL PLANT STUDIES. A SELECTION 1952-1962.
ERIC Educational Resources Information Center
PAWLEY, ERIC
A COLLECTION OF 40 ARTICLES DISCUSSES VARIOUS ASPECTS OF SCHOOL PLANNING PROBLEMS. THOSE ON PRELIMINARY PHASES REVIEW--(1) ARCHITECT SELECTION, (2) DEVELOPMENT OF EDUCATIONAL PROGRAMS, AND (3) SCHOOL COSTS. ARCHITECTURALLY-)RIENTED ARTICLES COVER--(1) CONSTRUCTION AND STRUCTURAL TYPES, (2) STANDARD SCHOOL PLANS, (3) FLEXIBILITY, (4)…
Problems, Perplexities, and Politics of Program Evaluation.
ERIC Educational Resources Information Center
Schneider, Gail Thierbach
All educational evaluations share common problems, perplexities, and political considerations. Logistic problems include incomplete definition of purpose, unclear timelines and personnel allocations, inadequate support services, and the lack of a program plan. Interpersonal dynamics and conflicts plus unwieldy committee structures are perplexities…
High temperature arc-track resistant aerospace insulation
NASA Technical Reports Server (NTRS)
Dorogy, William
1994-01-01
The topics are presented in viewgraph form and include the following: high temperature aerospace insulation; Foster-Miller approach to develop a 300 C rated, arc-track resistant aerospace insulation; advantages and disadvantages of key structural features; summary goals and achievements of the phase 1 program; performance goals for selected materials; materials under evaluation; molecular structures of candidate polymers; candidate polymer properties; film properties; and a detailed program plan.
Deshpande, Saee; Chahande, Jayashree
2014-01-01
Purpose Successful prosthodontic rehabilitation involves making many interrelated clinical decisions which have an impact on each other. Self-directed computer-based training has been shown to be a very useful tool to develop synthetic and analytical problem-solving skills among students. Thus, a computer-based case study and treatment planning (CSTP) software program was developed which would allow students to work through the process of comprehensive, multidisciplinary treatment planning for patients in a structured and logical manner. The present study was aimed at assessing the effect of this CSTP software on the clinical judgment of dental students while planning prosthodontic rehabilitation and to assess the students’ perceptions about using the program for its intended use. Methods A CSTP software program was developed and validated. The impact of this program on the clinical decision making skills of dental graduates was evaluated by real life patient encounters, using a modified and validated mini-CEX. Students’ perceptions about the program were obtained by a pre-validated feedback questionnaire. Results The faculty assessment scores of clinical judgment improved significantly after the use of this program. The majority of students felt it was an informative, useful, and innovative way of learning and they strongly felt that they had learnt the logical progression of planning, the insight into decision making, and the need for flexibility in treatment planning after using this program. Conclusion CSTP software was well received by the students. There was significant improvement in students’ clinical judgment after using this program. It should thus be envisaged fundamentally as an adjunct to conventional teaching techniques to improve students’ decision making skills and confidence. PMID:25170288
NASA Technical Reports Server (NTRS)
Founds, D.
1988-01-01
Some of the current and planned activities at the Air Force Systems Command in structures and controls for optical-type systems are summarized. Many of the activities are contracted to industry; one task is an in-house program which includes a hardware test program. The objective of the in-house program, referred to as the Aluminum Beam Expander Structure (ABES), is to address issues involved in on-orbit system identification. The structure, which appears similar to the LDR backup structure, is about 35 feet tall. The activity to date has been limited to acquisition of about 250 hours of test data. About 30 hours of data per excitation force is gathered in order to obtain sufficient data for a good statistical estimate of the structural parameters. The development of an Integrated Structural Modeling (ISM) computer program is being done by Boeing Aerospace Company. The objective of the contracted effort is to develop a combined optics, structures, thermal, controls, and multibody dynamics simulation code.
Vocational Programming for the LEP. Part 2: The Project Mainstream Experience.
ERIC Educational Resources Information Center
Wozniak-Stephens, Melaine
This monograph is intended as a resource for persons planning or administering a vocational program for limited English proficient (LEP) students. It describes the structure and operations of Project Mainstream, a bilingual vocational program serving Korean and Spanish speaking persons. Material is organized around three major topics. The first…
Does It Make a Difference If You Change the Structure? School-within-a-School.
ERIC Educational Resources Information Center
Nickle, Melinda Nixon; And Others
1990-01-01
Four secondary teachers, long accustomed to working in isolation, joined forces to provide an interdisciplinary program with flexible scheduling and common planning periods. This article describes their school-within-a-school program, its acceptance by the Coalition of Essential Schools, and the program's benefits. A sidebar provides restructuring…
The Implications of A. H. Maslow's "Hierarchy of Needs" Theory for Adult Education.
ERIC Educational Resources Information Center
Warren, Earle Theodore
The Maslow Hierarchy of Needs was reviewed and implications were sought for adult education theory, program planning and operation, promotional activities, and program evaluation. Maslow's work suggested self-actualization as an ultimate goal, meaning that adult education programs should be structured to foster both the acquisition of facts,…
30 CFR 250.912 - What plans must I submit under the Platform Verification Program?
Code of Federal Regulations, 2011 CFR
2011-07-01
... and major members of concrete-gravity and steel-gravity structures; (2) For jacket and floating structures, all the primary load-bearing members included in the space-frame analysis; and (3) A summary...
ERIC Educational Resources Information Center
Lonsdale, Helen C.; McWilliams, Alfred E., Jr.
The Program Component of the Satellite Technology Demonstration (STD) developed the programing for a television series on career planning for junior high school students. A program called "Time Out" was designed, developed, and implemented to be broadcast throughout the Rocky Mountain States. A staff of educators and communicators…
Vocal effort modulates the motor planning of short speech structures
NASA Astrophysics Data System (ADS)
Taitz, Alan; Shalom, Diego E.; Trevisan, Marcos A.
2018-05-01
Speech requires programming the sequence of vocal gestures that produce the sounds of words. Here we explored the timing of this program by asking our participants to pronounce, as quickly as possible, a sequence of consonant-consonant-vowel (CCV) structures appearing on screen. We measured the delay between visual presentation and voice onset. In the case of plosive consonants, produced by sharp and well defined movements of the vocal tract, we found that delays are positively correlated with the duration of the transition between consonants. We then used a battery of statistical tests and mathematical vocal models to show that delays reflect the motor planning of CCVs and transitions are proxy indicators of the vocal effort needed to produce them. These results support that the effort required to produce the sequence of movements of a vocal gesture modulates the onset of the motor plan.
Implementing Earned Value Management in the CxP EVA Systems Project Office
NASA Technical Reports Server (NTRS)
Sorge, Les L.
2009-01-01
Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.
Experiencing the Impact of Organizational Structure on Planning and Visioning Tasks
ERIC Educational Resources Information Center
Pennisi, Lisa
2012-01-01
The various ways natural resource agencies and programs are structured and how that impacts leadership style and products is an important concept for students to understand. Leadership style and organizational structure determine visions, missions, goals and objectives that set the tone for organizations. This exercise demonstrates organizational…
Self-Study and Evaluation Guide/Revised 1979. Section C-1: Function and Structure.
ERIC Educational Resources Information Center
National Accreditation Council for Agencies Serving the Blind and Visually Handicapped, New York, NY.
The self study guide designed for accreditation of programs serving the blind and visually handicapped covers function and structure standards, standards address five areas: basic characteristics of the organization (legal base, planning, consumer rights), governing authority, the Chief administrator, basic administrative structure (fees for…
Tailoring the Interview Process for More Effective Personnel Selection.
ERIC Educational Resources Information Center
Saville, Anthony
Structuring the initial teacher employment interview adds validity to selection and appropriately utilizes human resources. Five aspects of an effective interview program include: (1) developing a job analysis plan; (2) reviewing the applications; (3) planning for the interview; (4) the interview instrument; and (5) legal implications. An…
NASA Technical Reports Server (NTRS)
Thomas, Leann; Utley, Dawn
2006-01-01
While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
A computer program to analyze bending of bent caps.
DOT National Transportation Integrated Search
1966-10-01
This report is one of a series of developments planned to facilitate the : use of computers in the analysis of highway bridge structures. It specifically : concerns a computer program for the bending analysis of bent caps. : The development of this p...
An innovative program for multihandicapped deaf students using the FSSI.
Garner, D; Becker, H; Schur, S; Hammer, E
1991-07-01
Teachers in public schools now have more students with more severe disabilities than they did in the past. Unfortunately, efforts to provide them with a quality education have been hampered by a lack of focused instructional planning. This article describes an innovative program developed for deaf multihandicapped students that has created an integrated focus for instruction. The organizing framework for the program incorporates the Functional Skills Screening Inventory, a domain referenced assessment of living and working skills. This structured approach enables teachers to identify current functional levels, develop meaningful short- and long-term objectives, and monitor student progress throughout their educational programs. It also facilitates long-range planning and evaluation of the instructional program on an ongoing basis.
The historical path of evaluation as reflected in the content of Evaluation and Program Planning.
Ayob, Abu H; Morell, Jonathan A
2016-10-01
This paper examines the intellectual structure of evaluation by means of citation analysis. By using various article attributes and citation counts in Google Scholar and (Social) Science Citation Index Web of Science, we analyze all articles published in Evaluation and Program Planning from 2000 until 2012. We identify and discuss the characteristics and development of the field as reflected in the history of those citations. Copyright © 2016 Elsevier Ltd. All rights reserved.
Advanced composites wing study program, volume 2
NASA Technical Reports Server (NTRS)
Harvey, S. T.; Michaelson, G. L.
1978-01-01
The study on utilization of advanced composites in commercial aircraft wing structures was conducted as a part of the NASA Aircraft Energy Efficiency Program to establish, by the mid-1980s, the technology for the design of a subsonic commercial transport aircraft leading to a 40% fuel savings. The study objective was to develop a plan to define the effort needed to support a production commitment for the extensive use of composite materials in wings of new generation aircraft that will enter service in the 1985-1990 time period. Identification and analysis of what was needed to meet the above plan requirements resulted in a program plan consisting of three key development areas: (1) technology development; (2) production capability development; and (3) integration and validation by designing, building, and testing major development hardware.
NASA Astrophysics Data System (ADS)
KP, R. M. Bambang Setyohadi; Wicaksono, Dimas
2018-03-01
The poverty is one of the prevailing problems in Indonesia until now. Even a change of the era of governance has not succeeded in eradicating the problem of poverty. The program of poverty alleviation program has always been a focus in the budget allocation in all era of leadership in Indonesia. Those programs were strategic because it prepared the foundation of community self-reliance in the form of representative, entrenched and conducive community leadership institutions to develop of social capital of society in the future. Developing an area of the village requires an integrated planning (Grand Design) to figure out the potential and the problems existing in the rural area as well as the integration of the rural area surrounding. In addition, the grand design needs to be synchronized to the more comprehensive spatial plan with a hierarchical structure such as RTBL, RDTRK / RRTRK, RTRK, and RTRW. This rural area management plan can be oriented or refer to the pattern developed from neighborhood Development program which is part of the PNPM Mandiri program. The neighborhood development program is known as residential area development plan whose process involves of the entire community. Therefore, the regional development up to the scale of the environment requires the planning phase. Particularly, spatial planning which emphasizes the efforts to optimize sectorial development targets to be integrated into an integrated development process must be conducted, in addition to taking into consideration the opportunities, potentials and limitations of the resources, the level of interconnection with the central government within the district and between sub-districts and rural areas.
Awesome Adventures. Texas Reading Club, 1985. A Planning and Programming Handbook.
ERIC Educational Resources Information Center
Phelan, Jody; Otstott, Michele
Designed to encourage Texas youth to maintain reading skill levels achieved at the end of the school year and to encourage library use during the summer months and throughout the year, the Texas Reading Club programs usually include a structured reading program and a variety of entertaining literature related storyhours, puppet shows, films, and…
Readers of the Round Table: The 1998 Joint Kentucky - Arizona Reading Program.
ERIC Educational Resources Information Center
Kentucky State Dept. for Libraries and Archives, Frankfort.
Intended to encourage children of all ages to read over the summer, this manual presents library-based programs, crafts, displays, and events with a medieval theme. The chapters of the manual are: (1) Introductory Materials; (2) Goals, Objectives and Evaluation; (3) Getting Started; (4) Common Program Structures; (5) Planning Timeline; (6)…
ERIC Educational Resources Information Center
Wisconsin State Dept. of Public Instruction, Madison. Div. for Management and Planning Services.
The Elementary Secondary Education Act Title I Wisconsin Migrant Education Conference was held on August 6, 1979 to evaluate programs and to gather program planning data. Data for this evaluation were collected by means of both structured interaction of the 53 conference participants and questionnaires completed by participants. The teachers felt…
Structural assembly demonstration experiment, phase 1
NASA Astrophysics Data System (ADS)
Akin, David L.; Bowden, Mary L.; Miller, Rene H.
1983-03-01
The goal of this phase of the structural assembly and demonstration experiment (SADE) program was to begin to define a shuttle flight experiment that would yield data to compare on-orbit assembly operations of large space structures with neutral buoyancy simulations. In addition, the experiment would be an early demonstration of structural hardware and human capabilities in extravehicular activity (EVA). The objectives of the MIT study, as listed in the statement of work, were: to provide support in establishing a baseline neutral buoyancy testing data base, to develop a correlation technique between neutral buoyancy test results and on-orbit operations, and to prepare the SADE experiment plan (MSFC-PLAN-913).
Song, Misoon; Choi, Suyoung; Kim, Se-An; Seo, Kyoungsan; Lee, Soo Jin
2015-01-01
Development of behavior theory-based health promotion programs is encouraged with the paradigm shift from contents to behavior outcomes. This article describes the development process of the diabetes self-management program for older Koreans (DSME-OK) using intervention mapping (IM) protocol. The IM protocol includes needs assessment, defining goals and objectives, identifying theory and determinants, developing a matrix to form change objectives, selecting strategies and methods, structuring the program, and planning for evaluation and pilot testing. The DSME-OK adopted seven behavior objectives developed by the American Association of Diabetes Educators as behavioral outcomes. The program applied an information-motivation-behavioral skills model, and interventions were targeted to 3 determinants to change health behaviors. Specific methods were selected to achieve each objective guided by IM protocol. As the final step, program evaluation was planned including a pilot test. The DSME-OK was structured as the 3 determinants of the IMB model were intervened to achieve behavior objectives in each session. The program has 12 weekly 90-min sessions tailored for older adults. Using the IM protocol in developing a theory-based self-management program was beneficial in terms of providing a systematic guide to developing theory-based and behavior outcome-focused health education programs.
Draft SEI Program Plans: 1995-1999
1994-08-01
risk management because we believe that (a) structured techniques, even quite simple ones, can be effective in identifying and quantifying risk ; and (b...belief that (1) structured techniques, even quite simple ones, could be effective in identifying and quantifying risk ; and (2) techniques existed to
SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 6: Controls and guidance
NASA Technical Reports Server (NTRS)
1991-01-01
Viewgraphs of briefings from the Space Systems and Technology Advisory Committee (SSTAC)/ARTS review of the draft Integrated Technology Plan (ITP) on controls and guidance are included. Topics covered include: strategic avionics technology planning and bridging programs; avionics technology plan; vehicle health management; spacecraft guidance research; autonomous rendezvous and docking; autonomous landing; computational control; fiberoptic rotation sensors; precision instrument and telescope pointing; microsensors and microinstruments; micro guidance and control initiative; and earth-orbiting platforms controls-structures interaction.
Cabinet decision creating a family planning section in the Ministry of Manpower.
1989-01-01
As of April 1, 1989 the Indonesian Ministry of Manpower will contain a family planning section within its regular structure. It will be part of a newly created Sub-directorate for Workers Welfare, which also contains sections for health facilities/services and for nutrition and other welfare services. The family planning section is to be staffed by 8 full-time officials who are responsible for population, family welfare, and family planning programs in the Ministry of Manpower.
Modular space station phase B extension program master plan
NASA Technical Reports Server (NTRS)
Munsey, E. H.
1971-01-01
The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.
Plan To Reduce the Vulnerability of School Buildings to Natural Disasters: Dominica.
ERIC Educational Resources Information Center
Organization of American States, Washington, DC.
A workshop report provides the structure and content of a school building vulnerability reduction plan for schools in Dominica, determines roles and interactions between school stakeholders, and designs a natural hazard vulnerability reduction program. It provides a profile of the current stock of school buildings in Dominica while also addressing…
A computer-based tutorial structure for teaching and applying a complex process
Daniel L. Schmoldt; William G Bradshaw
1991-01-01
Economic accountability concerns for wildfire prevention planning have led to the development of an ignition management approach to fire problems. The Fire Loss Prevention Planning Process (FLPPP) systematizes fire problem analyses and concomitantly establishes a means for evaluating prescribed prevention programs. However, new users of the FLPPP have experienced...
Pensacola Junior College Educational Support Development Plan for the Aging and Aged.
ERIC Educational Resources Information Center
Tamburello, G. B.
This report recommends three general categories of involvement in the development of educational programs for the aging and aged at Pensacola Junior College (Florida). (1) Pre-retirement Education: courses should include the psychology of aging, family structures, estate planning, federal laws that affect the elderly, employment opportunities, and…
Education Strategic Plan 2015-2035: Advancing NOAA's Mission through Education. Executive Summary
ERIC Educational Resources Information Center
National Oceanic and Atmospheric Administration, 2016
2016-01-01
The National Oceanic and Atmospheric Administration (NOAA) Education Strategic Plan provides a framework to guide collaboration across the NOAA education community and a structure in which to track and report progress. Congress recognized the importance of NOAA's education programs with the passage of the America COMPETES Act. The America COMPETES…
Education Strategic Plan 2015-2035: Advancing NOAA's Mission through Education
ERIC Educational Resources Information Center
National Oceanic and Atmospheric Administration, 2016
2016-01-01
The National Oceanic and Atmospheric Administration (NOAA) Education Strategic Plan provides a framework to guide collaboration across the NOAA education community and a structure in which to track and report progress. Congress recognized the importance of NOAA's education programs with the passage of the America COMPETES Act. The America COMPETES…
Beyond Fees and Charges: The Need for a Pricing Strategy.
ERIC Educational Resources Information Center
Tugman, Sarah Jones
1985-01-01
As citizens demand governmental accountability, recreation agencies must devote attention to determining the cost of programs and to justifying the fee structure assigned to each program. This article addresses the need for proper pricing and offers a plan for establishing a pricing strategy. (MT)
1974-06-01
NAME AND ADDRESS Deputy for Development Planning Air Force Systems Command Wright-Patterson Air Force Base, Ohio READ INSTRUCTIONS BEFORE...6600 computer. Two stand-alone pro- grams operating within 100,000 octal units were also developed to provide optional data sources for SWEEP...JAMES H. HALL, Colonel, USAF Deputy for Development Planning ll jgaajaaMteaäiiaaBiiMiffliiäffliiteMä hi*^*Mi*^^*^&äitküli^ riMMiniiiMfWitii
Marketing health promotion: hitting or missing the target in occupational health.
Fontana, S A
1993-10-01
1. Occupational health nurses can use marketing strategies to plan, offer, and manage health promotion programs; and to conduct research aimed at better understanding the health needs of workers. 2. By applying a social marketing orientation to health promotion planning, occupational health nurses can tailor programs to fit employees' needs, and deliver health messages that are readily understandable to worker groups. 3. A priority in implementing any occupational health program or service is learning about the needs, desires, and health habits of employees. 4. Greater benefits to employee health may occur by targeting change in structures and systems at the workplace rather than solely focusing on lifestyle issues.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benioff, R.; Ness, E.; Hirst, J.
Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date withmore » the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.« less
NASA Astrophysics Data System (ADS)
Koelle, H. H.; Stephenson, D. G.
2003-04-01
This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector.
Management of the aging of critical safety-related concrete structures in light-water reactor plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Naus, D.J.; Oland, C.B.; Arndt, E.G.
1990-01-01
The Structural Aging Program has the overall objective of providing the USNRC with an improved basis for evaluating nuclear power plant safety-related structures for continued service. The program consists of a management task and three technical tasks: materials property data base, structural component assessment/repair technology, and quantitative methodology for continued-service determinations. Objectives, accomplishments, and planned activities under each of these tasks are presented. Major program accomplishments include development of a materials property data base for structural materials as well as an aging assessment methodology for concrete structures in nuclear power plants. Furthermore, a review and assessment of inservice inspection techniquesmore » for concrete materials and structures has been complete, and work on development of a methodology which can be used for performing current as well as reliability-based future condition assessment of concrete structures is well under way. 43 refs., 3 tabs.« less
Aging management program of the reactor building concrete at Point Lepreau Generating Station
NASA Astrophysics Data System (ADS)
Aldea, C.-M.; Shenton, B.; Demerchant, M. M.; Gendron, T.
2011-04-01
In order for New Brunswick Power Nuclear (NBPN) to control the risks of degradation of the concrete reactor building at the Point Lepreau Generating Station (PLGS) the development of an aging management plan (AMP) was initiated. The intention of this plan was to determine the requirements for specific structural components of concrete of the reactor building that require regular inspection and maintenance to ensure the safe and reliable operation of the plant. The document is currently in draft form and presents an integrated methodology for the application of an AMP for the concrete of the reactor building. The current AMP addresses the reactor building structure and various components, such as joint sealant and liners that are integral to the structure. It does not include internal components housed within the structure. This paper provides background information regarding the document developed and the strategy developed to manage potential degradation of the concrete of the reactor building, as well as specific programs and preventive and corrective maintenance activities initiated.
ERIC Educational Resources Information Center
Anderson, James C., II.; Thorson, Candi J.; Kelinsky, Lia R.
2016-01-01
This case study outlines an appreciative inquiry approach to program reform using an agricultural teacher education program at a land-grant university that had begun to suffer from a large decline in student enrollment. Documents were analyzed that provided recommendations toward a master plan for reform made by 23 key agents based on their…
Staff survey of organizational structure and process for a Public Health Department.
Dwyer, J J
1995-01-01
A survey of 227 North York Public Health Department (NYPHD) staff provided their perspective on the organizational structure. They perceived that (a) the departmental and divisional organizational structures are effective for program delivery, (b) the Central Resources structure and divisional and departmental reporting structures are moderately effective for program delivery, (c) the decentralized office structure is an advantage for service delivery but less so for administration and intra-division and inter-division communication, (d) the mandatory program structure involves low to moderate interdisciplinary teamwork and moderately impacts service delivery, (e) intra-division and management-staff communication are fair but inter-division and office communication are between poor and fair, (f) education, research, and service are moderately integrated, and (g) the divisional and departmental work atmospheres are a little positive. Management perceived greater participation in program planning, more frequent communication with other divisions, a number of education and research opportunities from various divisions/units, and more management recognition than front line staff did.
Managing Your Reading Program--A Total System.
ERIC Educational Resources Information Center
Hales, Carma M.; Jones, Maurine E.
This guide provides specific information on designing and implementing a reading program. The guide is divided into the following six parts: (1) "Planning for Instruction," including sections on setting ideal goals, establishing a "reality base," and organizing a work flow; (2) "Content Organization," including sections on the structure of…
Magical Mysteries. Texas Reading Club, 1984. A Librarian's Planning Handbook.
ERIC Educational Resources Information Center
Oliver, Jim
Designed to encourage library use by Texas youth, the Texas Reading Club programs usually include a structured reading program and a variety of entertaining literature-related storyhours, puppet shows, films, and other attractive happenings. This handbook for the 1984 theme--"magical mysteries"--focuses on mysteries, magic, and adventure…
Improving School Effectiveness by Teaching Thinking Skills.
ERIC Educational Resources Information Center
Zenke, Larry L.
This paper describes a plan to improve school effectiveness in the Tulsa (Oklahoma) Public Schools by incorporating instruction in thinking skills. The program selected by the school district was the Strategic Reasoning Program, based on Albert Upton's Design for Thinking and J. P. Guilford's Structure of the Intellect. The Strategic Reasoning…
NASA Technical Reports Server (NTRS)
Maag, W.
1977-01-01
The Flight Design System (FDS) and the Unified System for Orbit Computation (USOC) are compared and described in relation to mission planning for the shuttle transportation system (STS). The FDS is designed to meet the requirements of a standardized production tool and the USOC is designed for rapid generation of particular application programs. The main emphasis in USOC is put on adaptability to new types of missions. It is concluded that a software system having a USOC-like structure, adapted to the specific needs of MPAD, would be appropriate to support planning tasks in the area unique to STS missions.
2012-01-01
Introduction Improving access to sterile injection equipment is a key component in community-based infectious disease prevention. Implementation of syringe access programs has sometimes been complicated by community opposition and police interference. Case description In 2006, the Delaware legislature authorized a pilot syringe exchange program (SEP). A program designed to prevent, monitor, and respond to possible policing and community barriers before they had a chance to effect program implementation and operation. A program designed to prevent, monitor, and respond to these barriers was planned and implemented by a multidisciplinary team of legal practitioners and public health professionals. Discussion We report on an integrated intervention to address structural barriers to syringe exchange program utilization. This intervention employs community, police and client education combined with systematic surveillance of and rapid response to police interference to preempt the kinds of structural barriers to implementation observed elsewhere. The intervention addresses community concerns and stresses the benefits of syringe exchange programs to officer occupational safety. Conclusions A cohesive effort combining collaboration with and educational outreach to police and community members based on the needs and concerns of these groups as well as SEP clients and potential clients helped establish a supportive street environment for the SEP. Police-driven structural barriers to implementation of public health programs targeting populations engaged in drug use and other illicit behavior can be addressed by up-stream planning, prevention, monitoring and intervention strategies. More research is needed to inform the tailoring of interventions to address police-driven barriers to HIV prevention services, especially among marginalized populations. PMID:22591836
Medicare+Choice: what lies ahead?
Layne, R Jeffrey
2002-03-01
Health plans have continued to exit the Medicare+Choice program in recent years, despite efforts of Congress and the Centers for Medicare and Medicaid Services (CMS) to reform the program. Congress and CMS therefore stand poised to make additional, substantial reforms to the program. CMS has proposed to consolidate its oversight of the program, extend the due date for Medicare+Choice plans to file their adjusted community rate proposals, revise risk-adjustment processes, streamline the marketing review process, enhance quality-improvement requirements, institute results based performance assessment audits, coordinate policy changes to coincide with contracting cycles, expand its fall advertising campaign for the program, provide better employer-based Medicare options for beneficiaries, and take steps to minimize beneficiary costs. Congressional leaders have proposed various legislative remedies to improve the program, including creation of an entirely new pricing structure for the program based on a competitive bidding process.
Strong Motion Instrumentation of Seismically-Strengthened Port Structures in California by CSMIP
Huang, M.J.; Shakal, A.F.
2009-01-01
The California Strong Motion Instrumentation Program (CSMIP) has instrumented five port structures. Instrumentation of two more port structures is underway and another one is in planning. Two of the port structures have been seismically strengthened. The primary goals of the strong motion instrumentation are to obtain strong earthquake shaking data for verifying seismic analysis procedures and strengthening schemes, and for post-earthquake evaluations of port structures. The wharves instrumented by CSMIP were recommended by the Strong Motion Instrumentation Advisory Committee, a committee of the California Seismic Safety Commission. Extensive instrumentation of a wharf is difficult and would be impossible without the cooperation of the owners and the involvement of the design engineers. The instrumentation plan for a wharf is developed through study of the retrofit plans of the wharf, and the strong-motion sensors are installed at locations where specific instrumentation objectives can be achieved and access is possible. Some sensor locations have to be planned during design; otherwise they are not possible to install after construction. This paper summarizes the two seismically-strengthened wharves and discusses the instrumentation schemes and objectives. ?? 2009 ASCE.
NASA Technical Reports Server (NTRS)
Davis, John G., Jr.
1992-01-01
NASA's Advanced Composites Program (ACT) was initiated in 1988. A National Research Announcement was issued to solicit innovative ideas that could significantly contribute to development and demonstration of an integrated technology data base and confidence level that permits cost-effective use of composite primary structures in transport aircraft. Fifteen contracts were awarded by the Spring of 1989 and the participants include commercial and military airframe manufacturers, materials developers and suppliers, universities, and government laboratories. The program approach is to develop materials, structural mechanics methodology, design concepts, and fabrication procedures that offer the potential to make composite structures cost-effective compared to aluminum structure. Goals for the ACT program included 30-50 percent weight reduction, 20-25 percent acquisition cost reduction, and provided the scientific basis for predicting materials and structures performance. This paper provides an overview of the ACT program status, plans, and selected technical accomplishments. Sixteen additional papers, which provide more detailed information on the research and development accomplishments, are contained in this publication.
U.S. perspective on technology demonstration experiments for adaptive structures
NASA Technical Reports Server (NTRS)
Aswani, Mohan; Wada, Ben K.; Garba, John A.
1991-01-01
Evaluation of design concepts for adaptive structures is being performed in support of several focused research programs. These include programs such as Precision Segmented Reflector (PSR), Control Structure Interaction (CSI), and the Advanced Space Structures Technology Research Experiment (ASTREX). Although not specifically designed for adaptive structure technology validation, relevant experiments can be performed using the Passive and Active Control of Space Structures (PACOSS) testbed, the Space Integrated Controls Experiment (SPICE), the CSI Evolutionary Model (CEM), and the Dynamic Scale Model Test (DSMT) Hybrid Scale. In addition to the ground test experiments, several space flight experiments have been planned, including a reduced gravity experiment aboard the KC-135 aircraft, shuttle middeck experiments, and the Inexpensive Flight Experiment (INFLEX).
Heuristic Classification. Technical Report Number 12.
ERIC Educational Resources Information Center
Clancey, William J.
A broad range of well-structured problems--embracing forms of diagnosis, catalog selection, and skeletal planning--are solved in expert computer systems by the method of heuristic classification. These programs have a characteristic inference structure that systematically relates data to a pre-enumerated set of solutions by abstraction, heuristic…
Advanced manufacturing development of a composite empennage component for L-1011 aircraft
NASA Technical Reports Server (NTRS)
Alva, T.; Henkel, J.; Johnson, R.; Carll, B.; Jackson, A.; Mosesian, B.; Brozovic, R.; Obrien, R.; Eudaily, R.
1982-01-01
This is the final report of technical work conducted during the fourth phase of a multiphase program having the objective of the design, development and flight evaluation of an advanced composite empennage component manufactured in a production environment at a cost competitive with those of its metal counterpart, and at a weight savings of at least 20 percent. The empennage component selected for this program is the vertical fin box of the L-1011 aircraft. The box structure extends from the fuselage production joint to the tip rib and includes front and rear spars. During Phase 4 of the program, production quality tooling was designed and manufactured to produce three sets of covers, ribs, spars, miscellaneous parts, and subassemblies to assemble three complete ACVF units. Recurring and nonrecurring cost data were compiled and documented in the updated producibility/design to cost plan. Nondestruct inspections, quality control tests, and quality acceptance tests were performed in accordance with the quality assurance plan and the structural integrity control plan. Records were maintained to provide traceability of material and parts throughout the manufacturing development phase. It was also determined that additional tooling would not be required to support the current and projected L-1011 production rate.
Choose Your Own Adventure: A Hypertext Writing Experience.
ERIC Educational Resources Information Center
Schulze, Patricia
The writing program described in this lesson plan guides students to plan an adventure story, write different endings to the story, and create web sites with the parts of the story hyperlinked to each other. During six to eight 50-minute lessons, students will: understand the structure of Choose Your Own Adventure stories; become familiar with the…
ERIC Educational Resources Information Center
Brounley, Lindy
2010-01-01
The University of Florida (UF) established a Strategic Communications Planning Committee in May 2009 to coordinate a campuswide effort to promote strategic communications planning, strengthen the university's brand, unify key themes and messages, maximize use of available research and resources, and identify and propagate best practices and…
The Problem of Convergence and Commitment in Multigroup Evaluation Planning.
ERIC Educational Resources Information Center
Hausken, Chester A.
This paper outlines a model for multigroup evaluation planning in a rural-education setting wherein the commitment to the structure necessary to evaluate a program is needed on the part of a research and development laboratory, the state departments of education, county supervisors, and the rural schools. To bridge the gap between basic research,…
A Study of the Utilization of Advanced Composites in Fuselage Structures of Commercial Aircraft
NASA Technical Reports Server (NTRS)
Watts, D. J.; Sumida, P. T.; Bunin, B. L.; Janicki, G. S.; Walker, J. V.; Fox, B. R.
1985-01-01
A study was conducted to define the technology and data needed to support the introduction of advanced composites in the future production of fuselage structure in large transport aircraft. Fuselage structures of six candidate airplanes were evaluated for the baseline component. The MD-100 was selected on the basis of its representation of 1990s fuselage structure, an available data base, its impact on the schedule and cost of the development program, and its availability and suitability for flight service evaluation. Acceptance criteria were defined, technology issues were identified, and a composite fuselage technology development plan, including full-scale tests, was identified. The plan was based on composite materials to be available in the mid to late 1980s. Program resources required to develop composite fuselage technology are estimated at a rough order of magnitude to be 877 man-years exclusive of the bird strike and impact dynamic test components. A conceptual composite fuselage was designed, retaining the basic MD-100 structural arrangement for doors, windows, wing, wheel wells, cockpit enclosure, major bulkheads, etc., resulting in a 32 percent weight savings.
National Space Transportation and Support Study/technology requirements and plans
NASA Technical Reports Server (NTRS)
Walberg, G. D.; Gasperich, F. J., Jr.; Scheyhing, E. R.
1986-01-01
This paper presents a generic technology plan which has been developed as part of the National Space Transportation and Support Study. This program, which addresses a wide variety of potentially high payoff technology areas, is structured to promote both enhanced vehicle performance and greatly improved operational efficiency and includes both evolutionary and breakthrough technologies. The plan is presented in terms of disciplinary plan elements, which were developed by joint NASA/USAF disciplinary working groups, and as a set of demonstration projects which serve as focal points for the overall plan and drive the development of the many interrelated disciplinary activities.
Evaluation of a data dictionary system. [information dissemination and computer systems programs
NASA Technical Reports Server (NTRS)
Driggers, W. G.
1975-01-01
The usefulness was investigated of a data dictionary/directory system for achieving optimum benefits from existing and planned investments in computer data files in the Data Systems Development Branch and the Institutional Data Systems Division. Potential applications of the data catalogue system are discussed along with an evaluation of the system. Other topics discussed include data description, data structure, programming aids, programming languages, program networks, and test data.
Bauermeister, José A; Pingel, Emily S; Sirdenis, Triana Kazaleh; Andrzejewski, Jack; Gillard, Gage; Harper, Gary W
2017-09-01
HIV/STI incidence has shifted to a younger demographic, comprised disproportionately of gay and bisexual men, transgender women, and people of color. Recognizing the importance of community organizing and participatory engagement during the intervention planning process, we describe the steps taken to engage diverse constituents (e.g., youth and practitioners) during the development of a structural-level HIV/STI prevention and care initiative for young sexual and gender minorities in Southeast Michigan. Our multi-sector coalition (MFierce; Michigan Forward in Enhancing Research and Community Equity) utilized a series of community dialogues to identify, refine, and select programmatic strategies with the greatest potential. Evaluation data (N = 173) from the community dialogues highlighted constituents' overall satisfaction with our elicitation process. Using a case study format, we describe our community dialogue approach, illustrate how these dialogues strengthened our program development, and provide recommendations that may be used in future community-based program planning efforts. © Society for Community Research and Action 2017.
Bauermeister, José A.; Pingel, Emily S.; Sirdenis, Triana Kazaleh; Andrzejewski, Jack; Gillard, Gage; Harper, Gary W.
2017-01-01
HIV/STI incidence has shifted to a younger demographic, comprised disproportionately of gay and bisexual men, transgender women, and people of color. Recognizing the importance of community organizing and participatory engagement during the intervention planning process, we describe the steps taken to engage diverse constituents (e.g., youth, practitioners) during the development of a structural-level HIV/STI prevention and care initiative for young sexual and gender minorities in Southeast Michigan. Our multi-sector coalition (MFierce; Michigan Forward in Enhancing Research and Community Equity) utilized a series of community dialogues to identify, refine, and select programmatic strategies with the greatest potential. Evaluation data (N=173) from the community dialogues highlighted constituents’ overall satisfaction with our elicitation process. Using a case study format, we describe our community dialogue approach, illustrate how these dialogues strengthened our program development, and provide recommendations that may be used in future community-based program planning efforts. PMID:28685871
U.S. Nuclear Regulatory Commission natural analogue research program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kovach, L.A.; Ott, W.R.
1995-09-01
This article describes the natural analogue research program of the U.S. Nuclear Regulatory Commission (US NRC). It contains information on the regulatory context and organizational structure of the high-level radioactive waste research program plan. It also includes information on the conditions and processes constraining selection of natural analogues, describes initiatives of the US NRC, and describes the role of analogues in the licensing process.
Logic Models: A Tool for Effective Program Planning, Collaboration, and Monitoring. REL 2014-025
ERIC Educational Resources Information Center
Kekahio, Wendy; Lawton, Brian; Cicchinelli, Louis; Brandon, Paul R.
2014-01-01
A logic model is a visual representation of the assumptions and theory of action that underlie the structure of an education program. A program can be a strategy for instruction in a classroom, a training session for a group of teachers, a grade-level curriculum, a building-level intervention, or a district-or statewide initiative. This guide, an…
Space truss zero gravity dynamics
NASA Technical Reports Server (NTRS)
Swanson, Andy
1989-01-01
The Structural Dynamics Branch of the Air Force Flight Dynamics Laboratory in cooperation with the Reduced Gravity Office of the NASA Lyndon B. Johnson Space Center (JSC) plans to perform zero-gravity dynamic tests of a 12-meter truss structure. This presentation describes the program and presents all results obtained to date.
2007-06-01
Superiority. DoD C4ISR Cooperative Research Program, 2000. ( Chomsky , 1962) Noam Chomsky . Syntactic Structures. The Hague, The Netherlands: Mouton & Co...take one of two basic forms, linguistic representations and discourse models (See Chomsky , 1962). Discourse models make explicit the structure not of
National program for family planning and primary health care Pakistan: a SWOT analysis.
Wazir, Mohammad Salim; Shaikh, Babar Tasneem; Ahmed, Ashfaq
2013-11-22
The National Program for Family Planning and Primary Healthcare was launched in 1994. It is one of the largest community based programs in the world, providing primary healthcare services to about 80 million people, most of which is rural poor. The program has been instrumental in improving health related indicators of maternal and child health in the last two decades. SWOT analysis was used by making recourse to the structure and dynamics of the program as well as searching the literature. Strengths of the program include: comprehensive design of planning, implementation and supervision mechanisms aided by an MIS, selection and recruitments processes and evidence created through improving health impact indicators. Weaknesses identified are slow progress, poor integration of the program with health services at local levels including MIS, and de-motivational factors such as job insecurity and non-payment of salaries in time. Opportunities include further widening the coverage of services, its potential contribution to health system research, and its use in areas other than health like women empowerment and poverty alleviation. Threats the program may face are: political interference, lack of funds, social threats and implications for professional malpractices. Strengthening of the program will necessitate a strong political commitment, sustained funding and a just remuneration to this bare foot doctor of Pakistan, the Lady Health Worker.
Managing NASA in the Apollo era
NASA Technical Reports Server (NTRS)
Levine, A. S.
1982-01-01
The administration and organization are described and analyzed. Policies on manpower and the budgetary process for contracting for research development, the structure of NASA-DOD relations, and program planning are discussed.
International utilization and operations
NASA Technical Reports Server (NTRS)
Goldberg, Stanley R.
1989-01-01
The international framework of the Space Station Freedom Program is described. The discussion covers the U.S. space policy, international agreements, international Station elements, overall program management structure, and utilization and operations management. Consideration is also given to Freedom's user community, Freedom's crew, pressurized payload and attached payload accommodations, utilization and operations planning, user integration, and user operations.
Community College Program Planning: A Method to Measure and Meet Community Need
ERIC Educational Resources Information Center
Perez-Vergara, Kelly; Lathrop, Rachel; Orlowski, Martin
2018-01-01
Offering academic programs that meet community need has long been a core mission of community colleges. However, determining which job skills and credentials are needed for employment in the community is challenging. In order to facilitate a holistic and community-based perspective, our 2-year community college developed a structured curricular…
DOT National Transportation Integrated Search
2016-09-01
To support the peer exchange focus on improving the visibility and impact of the research : program, the agenda (Appendix A) was structured around five key topic areas presented : below. The NHDOT planning team developed amplifying questions for each...
Applications of artificial intelligence to mission planning
NASA Technical Reports Server (NTRS)
Ford, Donnie R.; Floyd, Stephen A.; Rogers, John S.
1990-01-01
The following subject areas are covered: object-oriented programming task; rule-based programming task; algorithms for resource allocation; connecting a Symbolics to a VAX; FORTRAN from Lisp; trees and forest task; software data structure conversion; software functionality modifications and enhancements; portability of resource allocation to a TI MicroExplorer; frontier of feasibility software system; and conclusions.
A Collaborative Approach to Planning the Induction Process for Beginning Vocational Teachers.
ERIC Educational Resources Information Center
Camp, William G.; Heath, Betty
An effective induction assistance program is necessary to prepare beginning vocational education teachers. A structured approach should be based on research, educational theory, experience, and the best thinking that can be found. To be successful, an induction assistance program must be a collaborative effort, accepted and supported by local…
Hong, Kyungeui; Gittelsohn, Joel; Joung, Hyojee
2010-06-01
The purpose of this study was to investigate the effects of personal characteristics and theory of planned behavior (TPB) constructs on the intention to participate in a restaurant health promotion program. In total, 830 adults residing in Seoul were sampled by a multi-stage cluster and random sampling design. Data were collected from a structured self-administered questionnaire, which covered variables concerning demographics, health status and TPB constructs including attitude, subjective norm and perceived behavioral control. A path analysis combining personal characteristics and TPB constructs was used to investigate determinants of the customers' intention. Positive and negative attitudes, subjective norms and perceived behavioral control directly affected the intention to participate. Demographics and health status both directly and indirectly affected the intention to participate. This study identifies personal characteristics and TPB constructs that are important to planning and implementing a restaurant health promotion program.
NASA Technical Reports Server (NTRS)
Smith-Taylor, Rudeen; Tanner, Sharon E.
1993-01-01
The NASA Controls-Structures Interaction (CSI) Guest Investigator program is described in terms of its support of the development of CSI technologies. The program is based on the introduction of CSI researchers from industry and academia to available test facilities for experimental validation of technologies and methods. Phase 1 experimental results are reviewed with attention given to their use of the Mini-MAST test facility and the facility for the Advance Control Evaluation of Structures. Experiments were conducted regarding the following topics: collocated/noncollocated controllers, nonlinear math modeling, controller design, passive/active suspension systems design, and system identification and fault isolation. The results demonstrate that significantly enhanced performance from the control techniques can be achieved by integrating knowledge of the structural dynamics under consideration into the approaches.
Gosdin, Craig; Simmons, Jeffrey; Yau, Connie; Sucharew, Heidi; Carlson, Douglas; Paciorkowski, Natalia
2013-06-01
Many pediatric academic centers have hospital medicine programs. Anecdotal data suggest that variability exists in program structure. To provide a description of the organizational, administrative, and financial structures of academic pediatric hospital medicine (PHM). This online survey focused on the organizational, administrative, and financial aspects of academic PHM programs, which were defined as hospitalist programs at US institutions associated with accredited pediatric residency program (n = 246) and identified using the Accreditation Council for Graduate Medical Education (ACGME) Fellowship and Residency Electronic Interactive Database. PHM directors and/or residency directors were targeted by both mail and the American Academy of Pediatrics Section on Hospital Medicine LISTSERV. The overall response rate was 48.8% (120/246). 81.7% (98/120) of hospitals reported having an academic PHM program, and 9.1% (2/22) of hospitals without a program reported plans to start a program in the next 3 years. Over a quarter of programs provide coverage at multiple sites. Variability was identified in many program factors, including hospitalist workload and in-house coverage provided. Respondents reported planning increased in-house hospitalist coverage coinciding with the 2011 ACGME work-hour restrictions. Few programs reported having revenues greater than expenses (26% single site, 4% multiple site). PHM programs exist in the majority of academic centers, and there appears to be variability in many program factors. This study provides the most comprehensive data on academic PHM programs and can be used for benchmarking as well as program development. Copyright © 2013 Society of Hospital Medicine.
77 FR 46800 - Proposed Agency Information Collection Activities; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-06
... plan. Individual Projects--Aimed at discrete capital projects that will result in service benefits or... entities; (2) managing, rather than eliminating, risk through program management structure, controls and...
Zeng, G; Murphy, J; Annis, S-L; Wu, X; Wang, Y; McGowan, T; Macpherson, M
2012-07-01
To report a quality control program in prostate radiation therapy at our center that includes semi-automated planning process to generate high quality plans and in-house software to track plan quality in the subsequent clinical application. Arc planning in Eclipse v10.0 was preformed for both intact prostate and post-prostatectomy treatments. The planning focuses on DVH requirements and dose distributions being able to tolerate daily setup variations. A modified structure set is used to standardize the optimization, including short rectum and bladder in the fields to effectively tighten dose to target and a rectum expansion with 1cm cropped from PTV to block dose and shape posterior isodose lines. Structure, plan and optimization templates are used to streamline plan generation. DVH files are exported from Eclipse to a quality tracking software with GUI written in Matlab that can report the dose-volume data either for an individual patient or over a patient population. For 100 intact prostate patients treated with 78Gy, rectal D50, D25, D15 and D5 are 30.1±6.2Gy, 50.6±7.9Gy, 65.9±6.0Gy and 76.6±1.4Gy respectively, well below the limits 50Gy, 65Gy, 75Gy and 78Gy respectively. For prostate bed with prescription of 66Gy, rectal D50 is 35.9±6.9Gy. In both sites, PTV is covered by 95% prescription and the hotspots are less than 5%. The semi-automated planning method can efficiently create high quality plans while the tracking software can monitor the feedback from clinical application. It is a comprehensive and robust quality control program in radiation therapy. © 2012 American Association of Physicists in Medicine.
Roach, Lindsay; Keats, Melanie
2018-01-01
Fundamental movement skill interventions are important for promoting physical activity, but the optimal intervention model for preschool children remains unclear. We compared two 8-week interventions, a structured skill-station and a planned active play approach, to a free-play control condition on pre- and postintervention fundamental movement skills. We also collected data regarding program attendance and perceived enjoyment. We found a significant interaction effect between intervention type and time. A Tukey honest significant difference analysis supported a positive intervention effect showing a significant difference between both interventions and the free-play control condition. There was a significant between-group difference in group attendance such that mean attendance was higher for both the free-play and planned active play groups relative to the structured skill-based approach. There were no differences in attendance between free-play and planned active play groups, and there were no differences in enjoyment ratings between the two intervention groups. In sum, while both interventions led to improved fundamental movement skills, the active play approach offered several logistical advantages. Although these findings should be replicated, they can guide feasible and sustainable fundamental movement skill programs within day care settings.
Koelle, H H; Stephenson, D G
2003-04-01
This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector. c2002 Elsevier Science Ltd. All rights reserved.
Effectively marketing prepaid medical care with decision support systems.
Forgionne, G A
1991-01-01
The paper reports a decision support system (DSS) that enables health plan administrators to quickly and easily: (1) manage relevant medical care market (consumer preference and competitors' program) information and (2) convert the information into appropriate medical care delivery and/or payment policies. As the paper demonstrates, the DSS enables providers to design cost efficient and market effective medical care programs. The DSS provides knowledge about subscriber preferences, customer desires, and the program offerings of the competition. It then helps administrators structure a medical care plan in a way that best meets consumer needs in view of the competition. This market effective plan has the potential to generate substantial amounts of additional revenue for the program. Since the system's data base consists mainly of the provider's records, routine transactions, and other readily available documents, the DSS can be implemented at a nominal incremental cost. The paper also evaluates the impact of the information system on the general financial performance of existing dental and mental health plans. In addition, the paper examines how the system can help contain the cost of providing medical care while providing better services to more potential beneficiaries than current approaches.
NASA Technical Reports Server (NTRS)
Hunsucker, J. L.
1993-01-01
The purpose of this report is to first present a basis or foundation for the building of an integrated risk management plan and them to present the plan. The integration referred to is across both the temporal and the hierarchical dimensions. Complexity, consequence, and credibility seem to be driving the need for the consideration of risk. Reduction of personal bias and reproducibility of the decision making process seem to be driving the consideration of a formal risk plan. While risk can be used as either a selection tool or a control tool, this paper concentrates on the selection usage. Risk relies on stated purpose. The tightness of the definition of purpose and success is directly reflected in the definition and control of risk. Much of a risk management plan could be designed by the answers to the questions of why, what, who, when, and where. However, any plan must provide the following information about a threat or risk: likelihood, consequence, predictability, reliability, and reproducibility. While the environment at NASA is seen as warm, but not hot, for the introduction of a risk program, some encouragement is seen if the following problems are addressed: no champion, no commitment of resource, confused definitions, lack of direction and focus, a hard sell, NASA culture, many choices of assessment methods, and cost. The plan is designed to follow the normal method of doing work and is structured to follow either the work break down structure or a functional structure very well. The parts of the plan include: defining purpose and success, initial threat assessment, initial risk assessment, reconciling threats and parameters, putting part of the information down and factoring the information back into the decision process as it comes back up, and developing inferences. Two major suggestions are presented. One is to build an office of risk management to be used as a resource by managers in doing the risk process. Another is to form a pilot program to try out the details in the plan and modify the method where needed.
Verification and Planning Based on Coinductive Logic Programming
NASA Technical Reports Server (NTRS)
Bansal, Ajay; Min, Richard; Simon, Luke; Mallya, Ajay; Gupta, Gopal
2008-01-01
Coinduction is a powerful technique for reasoning about unfounded sets, unbounded structures, infinite automata, and interactive computations [6]. Where induction corresponds to least fixed point's semantics, coinduction corresponds to greatest fixed point semantics. Recently coinduction has been incorporated into logic programming and an elegant operational semantics developed for it [11, 12]. This operational semantics is the greatest fix point counterpart of SLD resolution (SLD resolution imparts operational semantics to least fix point based computations) and is termed co- SLD resolution. In co-SLD resolution, a predicate goal p( t) succeeds if it unifies with one of its ancestor calls. In addition, rational infinite terms are allowed as arguments of predicates. Infinite terms are represented as solutions to unification equations and the occurs check is omitted during the unification process. Coinductive Logic Programming (Co-LP) and Co-SLD resolution can be used to elegantly perform model checking and planning. A combined SLD and Co-SLD resolution based LP system forms the common basis for planning, scheduling, verification, model checking, and constraint solving [9, 4]. This is achieved by amalgamating SLD resolution, co-SLD resolution, and constraint logic programming [13] in a single logic programming system. Given that parallelism in logic programs can be implicitly exploited [8], complex, compute-intensive applications (planning, scheduling, model checking, etc.) can be executed in parallel on multi-core machines. Parallel execution can result in speed-ups as well as in larger instances of the problems being solved. In the remainder we elaborate on (i) how planning can be elegantly and efficiently performed under real-time constraints, (ii) how real-time systems can be elegantly and efficiently model- checked, as well as (iii) how hybrid systems can be verified in a combined system with both co-SLD and SLD resolution. Implementations of co-SLD resolution as well as preliminary implementations of the planning and verification applications have been developed [4]. Co-LP and Model Checking: The vast majority of properties that are to be verified can be classified into safety properties and liveness properties. It is well known within model checking that safety properties can be verified by reachability analysis, i.e, if a counter-example to the property exists, it can be finitely determined by enumerating all the reachable states of the Kripke structure.
ERIC Educational Resources Information Center
Office of Inspector General (ED), Washington, DC.
An independent audit was done of the principal financial statements of the William D. Ford Federal Direct Loan Program of the Department of Education for the year ending September 30, 1994. In planning and performing the review the auditors considered the internal control structure of the program in order to determine auditing procedures. The…
Structural evaluation of a DTHR bundle divertor particle collector
DOE Office of Scientific and Technical Information (OSTI.GOV)
Prevenslik, T.V.
1980-09-01
The purpose of this report is to present a structural evaluation of the current bundle divertor particle collector BDPC design under a peak heat flux in relation to criteria that protect against coolant leakage into the plasma over replacement schedules planned during DTHR operation. In addition, an assessment of the BDPC structural integrity at higher heat fluxes is presented. Further, recommendations for modifications in the current BDPC design that would improve design reliability to be considered in future design studies are described. Finally, experimental test programs directed to establishing materials data necessary in providing greater confidence in subsequent structural evaluationsmore » of BDPC designs in relation to coolant leakage over planned replacement schedules are identified.« less
Space-based solar power conversion and delivery systems study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Hazelrigg, G. A., Jr.
1976-01-01
The technical and economic aspects of satellite solar power systems are presented with a focus on the current configuration 5000 MW system. The technical studies include analyses of the orbital system structures, control and stationkeeping, and the formulation of program plans and costs for input to the economic analyses. The economic analyses centered about the development and use of a risk analysis model for a system cost assessment, identification of critical issues and technologies, and to provide information for programmatic decision making. A preliminary economic examination of some utility interface issues is included. Under the present state-of-knowledge, it is possible to formulate a program plan for the development of a satellite solar power system that can be economically justified. The key area of technological uncertainty is man's ability to fabricate and assemble large structures in space.
Radiosounding in the planned mission to Phobos
NASA Astrophysics Data System (ADS)
Zakharov, A. V.; Eismont, N. A.; Gotlib, V. M.; Smirnov, V. M.; Yushkova, O. V.; Marchuk, V. N.
2017-09-01
The opportunities to study Phobos' internal structure provided by radio methods are considered in this paper. The necessity of these studies is related to solution of the problem of the origin of the Martian moons. Radiosounding is one of the most efficient methods of analyzing the internal structure of small space objects and, in particular, that of Phobos. The new Boomerang project planned according to the Federal Space Program of Russia for 2016—2025 within the Expedition-M program aimed at the exploration of Phobos and delivery of soil samples from its surface to the Earth, as well as the specifics of a ballistic scenario of this expedition, provide a unique opportunity to carry out radioscopy of this space object to discover the internal structure Phobos and to solve the key problem of its origin. The model of Phobos' internal structure, radiosounding ballistic conditions, analysis of optimum frequency range of sounding, and key parameters of the device required for the experiment are considered in this paper. The significance of proposed studies and opportunities for their implementation are discussed.
A unified approach for composite cost reporting and prediction in the ACT program
NASA Technical Reports Server (NTRS)
Freeman, W. Tom; Vosteen, Louis F.; Siddiqi, Shahid
1991-01-01
The Structures Technology Program Office (STPO) at NASA Langley Research Center has held two workshops with representatives from the commercial airframe companies to establish a plan for development of a standard cost reporting format and a cost prediction tool for conceptual and preliminary designers. This paper reviews the findings of the workshop representatives with a plan for implementation of their recommendations. The recommendations of the cost tracking and reporting committee will be implemented by reinstituting the collection of composite part fabrication data in a format similar to the DoD/NASA Structural Composites Fabrication Guide. The process of data collection will be automated by taking advantage of current technology with user friendly computer interfaces and electronic data transmission. Development of a conceptual and preliminary designers' cost prediction model will be initiated. The model will provide a technically sound method for evaluating the relative cost of different composite structural designs, fabrication processes, and assembly methods that can be compared to equivalent metallic parts or assemblies. The feasibility of developing cost prediction software in a modular form for interfacing with state of the art preliminary design tools and computer aided design (CAD) programs is assessed.
Rethinking schools of public health: a strategic alliance model.
Moloughney, Brent W; Skinner, Harvey A
2006-01-01
Canada is in the midst of rejuvenation of public health organizations, mandates and infrastructure. Major planning exercises are underway regarding public health human resources, where academic institutions have a key role to play. To what extent could schools of public health be part of the solution? Many universities across Canada are considering or in the process of implementing MPH programs (some 17 programs planned and/or underway) and possible schools of public health. However, concerns are raised about critical mass, quality and standards. We encourage innovation and debate about ways to enhance collaborative and structural arrangements for education programs. A school of public health model might emerge from this, but so too might other models. Also, novel types of organizational structure need consideration. One example is a "strategic alliance" model that is broad-based, integrative and adaptive--building on the interdisciplinary focus needed for addressing public health concerns in the 21st century. From our perspective, the central question is: what (new) types of organizational structures and, equally important, collaborative networks will enable Canada to strengthen its public health workforce so that it may better address local and global challenges to public health?
ERIC Educational Resources Information Center
BEAUMONT, JOHN A; AND OTHERS
DESIGNED TO ASSIST ADMINISTRATORS, SUPERVISORS, AND TEACHERS TO PLAN, DEVELOP, AND EVALUATE PROGRAMS, THIS CURRICULUM GUIDE OFFERS COURSE OUTLINES, PROCEDURES, LABORATORY LAYOUTS, TEXTS AND REFERENCES, LISTS OF LABORATORY EQUIPMENT AND ITS COST, AND A SELECTED LIST OF SCIENTIFIC AND TECHNICAL SOCIETIES. BASIC MATERIALS WERE PREPARED AT THE…
Parsing Protocols Using Problem Solving Grammars. AI Memo 385.
ERIC Educational Resources Information Center
Miller, Mark L.; Goldstein, Ira P.
A theory of the planning and debugging of computer programs is formalized as a context free grammar, which is used to reveal the constituent structure of problem solving episodes by parsing protocols in which programs are written, tested, and debugged. This is illustrated by the detailed analysis of an actual session with a beginning student…
ERIC Educational Resources Information Center
Kissack, Heather C.; Callahan, Jamie L.
2010-01-01
Purpose: The purpose of this paper is to demonstrate that training designers can, and should, account for organizational culture during training needs assessments. Design/methodology/approach: Utilizing the approach and arguments in Giddens' structuration theory, the paper conceptually applies these tenets to training and development programs…
NASA Astrophysics Data System (ADS)
Fine, Rana A.; Walker, Dan
In June 1996, the National Research Council (NRC) formed the Committee on Major U.S. Oceanographic Research Programs to foster coordination among the large programs (e.g., World Ocean Circulation Experiment, Ocean Drilling Program, Ridge Interdisciplinary Global Experiment, and others) and examine their role in ocean research. In particular, the committee is charged with (1) enhancing information sharing and the coordinated implementation of the research plans of the major ongoing and future programs; (2) assisting the federal agencies and ocean sciences community in identifying gaps, as well as appropriate followon activities to existing programs; (3) making recommendations on how future major ocean programs should be planned, structured and organized; and (4) evaluating the impact of major ocean programs on the understanding of the oceans, development of research facilities, education, and collegiality in the academic community. The activity was initiated at the request of the National Science Foundation (NSF) Division of Ocean Sciences, is overseen by the NRC's Ocean Studies Board (OSB), and is funded by both NSF and the Office of Naval Research.
The Acceptance Strategy for Nuclear Power Plant In Indonesia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Suhaemi, Tjipta; Syaukat, Achmad
2010-06-22
Indonesia has planned to build nuclear power plants. Some feasibility studies have been conducted intensively. However, the processes of NPP introduction are still uncertain. National Energy Plan in Indonesia, which has been made by some governmental agencies, does not yet give positive impact to the government decision to construct the nuclear power plant (NPP). This paper discusses the process of NPP introduction in Indonesia, which has been colored with debate of stakeholder and has delayed decision for go-nuclear. The technology paradigm is used to promote NPP as an alternative of reliable energy resources. This paradigm should be complemented with internationalmore » politic-economic point of view. The international politic-economic point of view shows that structural powers, consisting of security, production, finance, and knowledge structures, within which the NPP is introduced, have dynamic characteristics. The process of NPP introduction in Indonesia contains some infrastructure development (R and D, legislation, regulation, energy planning, site study, public acceptance efforts, etc), but they need a better coherent NPP implementation program and NPP Acceptance Program. Strategic patterns for NPP acceptance described in this paper are made by considering nuclear regulation development and the interest of basic domestic participation. The first NPP program in Indonesia having proven technology and basic domestic participation is and important milestone toward and optimal national energy-mix.« less
New technology planning and approval: critical factors for success.
Haselkorn, Ateret; Rosenstein, Alan H; Rao, Anil K; Van Zuiden, Michele; Coye, Molly J
2007-01-01
The steady evolution of technology, with the associated increased costs, is a major factor affecting health care delivery. In the face of limited capital resources, it is important for hospitals to integrate technology management with the strategic plan, mission, and resource availability of the organization. Experiences in technology management have shown that having a well-organized, consistent approach to technology planning, assessment, committee membership, approval, evaluation, implementation, and monitoring are key factors necessary to ensure a successful program. We examined the results of a survey that assessed the structure, processes, and cultural support behind hospital committees for new technology planning and approval.
Site support program plan for ICF Kaiser Hanford Company, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-10-01
This document is the general administrative plan implemented by the Hanford Site contractor, ICF Kaiser Hanford Company. It describes the mission, administrative structure, projected staffing, to be provided by the contractor. The report breaks out the work responsibilities within the different units of the company, a baseline schedule for the different groups, and a cost summary for the different operating units.
Center of Gravity within the Ill-Structured Problem
2012-05-04
NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER Chad Livingston...Simon, Decision Making and Problem Solving 28 Cardon and Leonard, Unleashing Design, Planning and the Art of Battle Command, 2 11 complex, ill...Command. "Commander’s Appreciation and Campaign Design." Fort Monroe, VA, January 2008. Edward Cardon and Steve Leonard. "Unleashing Design, Planning
Costs, payments, and incentives in family planning programs: a review for developing countries.
Ross, J A; Isaacs, S L
1988-01-01
Anxieties about financing health and family planning programs have grown in recent years, leading to discussions of cost-recovery measures that would raise charges to the consumer. Yet some governments wish to lower cost to encourage contraceptive use, and a few use incentives and disincentives. Data from numerous developing countries are presented on contraceptive cost topics: charges for contraceptive supplies and services, in both public and private sectors, and conversely, payments made to clients and providers to offset costs and to increase contraceptive use. The data show great diversity, and much inconsistency within countries, indicating that the structures of charges, payments, and incentives in many programs could be improved. Ethical considerations are discussed, and guidelines are suggested for developing effective financial policies.
Developing inventory and monitoring programs based on multiple objectives
NASA Astrophysics Data System (ADS)
Schmoldt, Daniel L.; Peterson, David L.; Silsbee, David G.
1994-09-01
Resource inventory and monitoring (I&M) programs in national parks combine multiple objectives in order to create a plan of action over a finite time horizon. Because all program activities are constrained by time and money, it is critical to plan I&M activities that make the best use of available agency resources. However, multiple objectives complicate a relatively straightforward allocation process. The analytic hierarchy process (AHP) offers a structure for multiobjective decision making so that decision-makers’ preferences can be formally incorporated in seeking potential solutions. Within the AHP, inventory and monitoring program objectives and decision criteria are organized into a hierarchy. Pairwise comparisons among decision elements at any level of the hierarchy provide a ratio scale ranking of those elements. The resulting priority values for all projects are used as each project’s contribution to the value of an overall I&M program. These priorities, along with budget and personnel constraints, are formulated as a zero/one integer programming problem that can be solved to select those projects that produce the best program. An extensive example illustrates how this approach is being applied to I&M projects in national parks in the Pacific Northwest region of the United States. The proposed planning process provides an analytical framework for multicriteria decisionmaking that is rational, consistent, explicit, and defensible.
NASA/FAA general aviation crash dynamics program - An update
NASA Technical Reports Server (NTRS)
Hayduk, R. J.; Thomson, R. G.; Carden, H. D.
1979-01-01
Work in progress in the NASA/FAA General Aviation Crash Dynamics Program for the development of technology for increased crash-worthiness and occupant survivability of general aviation aircraft is presented. Full-scale crash testing facilities and procedures are outlined, and a chronological summary of full-scale tests conducted and planned is presented. The Plastic and Large Deflection Analysis of Nonlinear Structures and Modified Seat Occupant Model for Light Aircraft computer programs which form part of the effort to predict nonlinear geometric and material behavior of sheet-stringer aircraft structures subjected to large deformations are described, and excellent agreement between simulations and experiments is noted. The development of structural concepts to attenuate the load transmitted to the passenger through the seats and subfloor structure is discussed, and an apparatus built to test emergency locator transmitters in a realistic environment is presented.
National program for family planning and primary health care Pakistan: a SWOT analysis
2013-01-01
Background The National Program for Family Planning and Primary Healthcare was launched in 1994. It is one of the largest community based programs in the world, providing primary healthcare services to about 80 million people, most of which is rural poor. The program has been instrumental in improving health related indicators of maternal and child health in the last two decades. Methods SWOT analysis was used by making recourse to the structure and dynamics of the program as well as searching the literature. SWOT analysis Strengths of the program include: comprehensive design of planning, implementation and supervision mechanisms aided by an MIS, selection and recruitments processes and evidence created through improving health impact indicators. Weaknesses identified are slow progress, poor integration of the program with health services at local levels including MIS, and de-motivational factors such as job insecurity and non-payment of salaries in time. Opportunities include further widening the coverage of services, its potential contribution to health system research, and its use in areas other than health like women empowerment and poverty alleviation. Threats the program may face are: political interference, lack of funds, social threats and implications for professional malpractices. Conclusion Strengthening of the program will necessitate a strong political commitment, sustained funding and a just remuneration to this bare foot doctor of Pakistan, the Lady Health Worker. PMID:24268037
Development of Hybrid Product Breakdown Structure for NASA Ground Systems
NASA Technical Reports Server (NTRS)
Monaghan, Mark W.; Henry, Robert J.
2013-01-01
The Product Breakdown Structure is traditionally a method of identification of the products of a project in a tree structure. It is a tool used to assess, plan, document, and display the equipment requirements for a project. It is part of a product based planning technique, and attempts to break down all components of a project in as much detail as possible, so that nothing is overlooked. The PBS for ground systems at the Kennedy Space Center is being developed to encompass the traditional requirements including the alignment of facility, systems, and components to the organizational hierarchy. The Ground Operations Product Breakdown Structure is a hybrid in nature in that some aspects of a work breakdown structure will be incorporated and merged with the Architecture Concept of Operations, Master Subsystem List, customer interface, and assigned management responsibility. The Ground Operations Product Breakdown Structure needs to be able to identify the flexibility of support differing customers (internal and external) usage of ground support equipment within the Kennedy Space Center launch and processing complex. The development of the Product Breakdown Structure is an iterative activity Initially documenting the organization hierarchy structure and relationships. The Product Breakdown Structure identifies the linkage between the customer program requirements, allocation of system resources, development of design goals, and identification logistics products. As the Product Breakdown Structure progresses the incorporation of the results of requirement planning for the customer occurs identifying facility needs and systems. The mature Product Breakdown Structure is baselined with a hierarchical drawing, the Product Breakdown Structure database, and an associated document identifying the verification of the data through the life cycle of the program/product line. This paper will document, demonstrate, and identify key aspects of the life cycle of a Hybrid Product Breakdown Structure. The purpose is to show how a project management and system engineering approach can be utilized for providing flexible customer service in an evolving manned space flight launch processing environment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-02
This report consists of three separate but related reports. They are (1) Human Resource Development, (2) Carbon-based Structural Materials Research Cluster, and (3) Data Parallel Algorithms for Scientific Computing. To meet the objectives of the Human Resource Development plan, the plan includes K--12 enrichment activities, undergraduate research opportunities for students at the state`s two Historically Black Colleges and Universities, graduate research through cluster assistantships and through a traineeship program targeted specifically to minorities, women and the disabled, and faculty development through participation in research clusters. One research cluster is the chemistry and physics of carbon-based materials. The objective of thismore » cluster is to develop a self-sustaining group of researchers in carbon-based materials research within the institutions of higher education in the state of West Virginia. The projects will involve analysis of cokes, graphites and other carbons in order to understand the properties that provide desirable structural characteristics including resistance to oxidation, levels of anisotropy and structural characteristics of the carbons themselves. In the proposed cluster on parallel algorithms, research by four WVU faculty and three state liberal arts college faculty are: (1) modeling of self-organized critical systems by cellular automata; (2) multiprefix algorithms and fat-free embeddings; (3) offline and online partitioning of data computation; and (4) manipulating and rendering three dimensional objects. This cluster furthers the state Experimental Program to Stimulate Competitive Research plan by building on existing strengths at WVU in parallel algorithms.« less
Keyonzo, Nelson; Nyachae, Paul; Kagwe, Peter; Kilonzo, Margaret; Mumba, Feddis; Owino, Kenneth; Kichamu, George; Kigen, Bartilol; Fajans, Peter; Ghiron, Laura; Simmons, Ruth
2015-05-01
This paper describes how the Urban Reproductive Health Initiative in Kenya, the Tupange Project (2010-2015), successfully applied the ExpandNet approach to sustainably scale up family planning interventions, first in Machakos and Kakamega, and subsequently also in its three core cities, Nairobi, Kisumu and Mombasa. This new focus meant shifting from a "project" to a "program" approach, which required paying attention to government leadership and ownership, limiting external inputs, institutionalizing interventions in existing structures and emphasizing sustainability. The paper also highlights the project's efforts to prepare for the future scale up of Tupange's interventions in other counties to support continuing and improved access to family planning services in the new context of devolution (decentralization) in Kenya. Copyright © 2015. Published by Elsevier Ltd.
Waste certification program plan for Oak Ridge National Laboratory. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1997-09-01
This document defines the waste certification program (WCP) developed for implementation at Oak Ridge National Laboratory (ORNL). The document describes the program structure, logic, and methodology for certification of ORNL wastes. The purpose of the WCP is to provide assurance that wastes are properly characterized and that the Waste Acceptance Criteria (WAC) for receiving facilities are met. The program meets the waste certification requirements for mixed (both radioactive and hazardous) and hazardous [including polychlorinated biphenyls (PCB)] waste. Program activities will be conducted according to ORNL Level 1 document requirements.
National Rocket Propulsion Materials Plan: A NASA, Department of Defense, and Industry Partnership
NASA Technical Reports Server (NTRS)
Clinton, Raymond G., Jr.; Munafo, Paul M. (Technical Monitor)
2001-01-01
NASA, Department of Defense, and rocket propulsion industry representatives are working together to create a national rocket propulsion materials development roadmap. This "living document" will facilitate collaboration among the partners, leveraging of resources, and will be a highly effective tool for technology development planning. The structuring of the roadmap, and development plan, which will combine the significant efforts of the Integrated High Payoff Rocket Propulsion Technology (IHPRPT) Program, and NASA's Integrated Space Transportation Plan (ISTP), is being lead by the IHPRPT Materials Working Group (IMWG). The IHPRPT Program is a joint DoD, NASA, and industry effort to dramatically improve the nation's rocket propulsion capabilities. This phased program is structured with increasingly challenging goals focused on performance, reliability, and cost to effectively double rocket propulsion capabilities by 2010. The IHPRPT program is focused on three propulsion application areas: Boost and Orbit Transfer (both liquid rocket engines and solid rocket motors), Tactical, and Spacecraft. Critical to the success of this initiative is the development and application of advanced materials, processes, and manufacturing technologies. NASA's ISTP is a comprehensive strategy focusing on the aggressive safety, reliability, and affordability goals for future space transportation systems established by the agency. Key elements of this plan are the 2 nd and 3 d Generation Reusable Launch Vehicles (RLV). The affordability and safety goals of these generational systems are, respectively, 10X cheaper and 100X safer by 2010, and 100X cheaper and 10,000X safer by 2025. Accomplishment of these goals requires dramatic and sustained breakthroughs, particularly in the development and the application of advanced material systems. The presentation will provide an overview of the IHPRPT materials initiatives, NASA's 2nd and 3 rd Generation RLV propulsion materials projects, and the approach for the development of the national rocket propulsion materials roadmap.
Use of program logic models in the Southern Rural Access Program evaluation.
Pathman, Donald; Thaker, Samruddhi; Ricketts, Thomas C; Albright, Jennifer B
2003-01-01
The Southern Rural Access Program (SRAP) evaluation team used program logic models to clarify grantees' activities, objectives, and timelines. This information was used to benchmark data from grantees' progress reports to assess the program's successes. This article presents a brief background on the use of program logic models--essentially charts or diagrams specifying a program's planned activities, objectives, and goals--for evaluating and managing a program. It discusses the structure of the logic models chosen for the SRAP and how the model concept was introduced to the grantees to promote acceptance and use of the models. The article describes how the models helped clarify the program's objectives and helped lead agencies plan and manage the many program initiatives and subcontractors in their states. Models also provided a framework for grantees to report their progress to the National Program Office and evaluators and promoted the evaluators' visibility and acceptance by the grantees. Program logics, however, increased grantees' reporting requirements and demanded substantial time of the evaluators. Program logic models, on balance, proved their merit in the SRAP through their contributions to its management and evaluation and by providing a better understanding of the program's initiatives, successes, and potential impact.
Tender Beginnings program: an educational continuum for the maternity patient.
Brown, Susan E H
2006-01-01
The Tender Beginnings program demonstrates a comprehensive educational plan for maternity patients that can be extended throughout pregnancy, the birth process, and into the postpartum period. In today's healthcare environment, where the maternity patient continues to experience a shortened stay structure, the hurried learning process that is absorbed over a 48-hour stay is often ineffectual. This program provides a strategy and framework for effective teaching that can be successfully implemented all through the peripartum period. Budgetary constraints have given way to an innovative approach and opportunity for the healthcare specialist to explore an entrepreneurial relationship within the structure of the program. The Tender Beginnings program has proven to be a true integration of community educational outreach, nurse entrepreneurship, hospital-based education, and postpartum/neonatal follow-up.
NASA Technical Reports Server (NTRS)
Watts, D. J.
1978-01-01
The overall wing study objectives are to study and plan the effort by commercial transport aircraft manufacturers to accomplish the transition from current conventional materials and practices to extensive use of advanced composites in wings of aircraft that will enter service in the 1985-1990 time period. Specific wing study objectives are to define the technology and data needed to support an aircraft manufacturer's commitment to utilize composites primary wing structure in future production aircraft and to develop plans for a composite wing technology program which will provide the needed technology and data.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Olch, A
2015-06-15
Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Elevenmore » neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear Corporation has provded a license for the software described.« less
Brundage, Michael D; Hart, Margaret; O'Donnell, Jennifer; Reddeman, Lindsay; Gutierrez, Eric; Foxcroft, Sophie; Warde, Padraig
Peer review of radiation oncology treatment plans is increasingly recognized as an important component of quality assurance in radiation treatment planning and delivery. Peer review of treatment plans can directly improve the quality of those plans and can also have indirect effects on radiation treatment programs. We undertook a systematic, qualitative approach to describing the indirect benefits of peer review, factors that were seen to facilitate or act as barriers to the implementation of peer review, and strategies to address these barriers across a provincial jurisdiction of radiation oncology programs (ROPs). Semistructured qualitative interviews were held with radiation oncology department heads and radiation therapy managers (or delegates) in all 14 ROPs in Ontario, Canada. We used a theoretically guided phenomenological qualitative approach to design and analyze the interview content. Themes were recorded by 2 independent reviewers, and any discordance was resolved by consensus. A total of 28 interviews were completed with 32 interviewees. Twenty-two unique themes addressed perceived benefits of peer review, relating to either peer review structure (n = 3), process (n = 9), or outcome (n = 10). Of these 22 themes, 19 related to indirect benefits to ROPs. In addition, 18 themes related to factors that facilitated peer review activities and 30 themes related to key barriers to implementing peer review were identified. Findings were consistent with, and enhanced the understanding of, previous survey-based assessments of the benefits and challenges of implementing peer review programs. Although challenges and concerns regarding the implementation of peer review were evident, the indirect benefits to radiation programs are numerous, far outweigh the implementation challenges, and strongly complement the direct individual-patient benefits that result from peer review quality assurance of radiation treatment plans. Copyright © 2016. Published by Elsevier Inc.
Germaine Reyes-French; Timothy J. Cohen
1991-01-01
This paper outlines a mitigation program for pipeline construction impacts to oak tree habitat by describing the requirements for the Offsite Oak Mitigation Program for the All American Pipeline (AAPL) in Santa Barbara County, California. After describing the initial environmental analysis, the County regulatory structure is described under which the plan was required...
EPA Region 9 Guidance for Quality Assurance Program Plans - R9qa/03.2
In order for decision makers to have confidence in the quality of environmental data used to support their decisions, the organization must have structured and documented process for quality in place.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
..., including minor to moderate effects on water quality, benthic resources, coral and essential fish habitats... required for the park's recycling program and other operations and activities). Originally the NPS planned...
Comparison of provider and plan-based targeting strategies for disease management.
Annis, Ann M; Holtrop, Jodi Summers; Tao, Min; Chang, Hsiu-Ching; Luo, Zhehui
2015-05-01
We aimed to describe and contrast the targeting methods and engagement outcomes for health plan-delivered disease management with those of a provider-delivered care management program. Health plan epidemiologists partnered with university health services researchers to conduct a quasi-experimental, mixed-methods study of a 2-year pilot. We used semi-structured interviews to assess the characteristics of program-targeting strategies, and calculated target and engagement rates from clinical encounter data. Five physician organizations (POs) with 51 participating practices implemented care management. Health plan member lists were sent monthly to the practices to accept patients, and then the practices sent back data reports regarding targeting and engagement in care management. Among patients accepted by the POs, we compared those who were targeted and engaged by POs with those who met health plan targeting criteria. The health plan's targeting process combined claims algorithms and employer group preferences to identify candidates for disease management; on the other hand, several different factors influenced PO practices' targeting approaches, including clinical and personal knowledge of the patients, health assessment information, and availability of disease-relevant programs. Practices targeted a higher percentage of patients for care management than the health plan (38% vs 16%), where only 7% of these patients met the targeting criteria of both. Practices engaged a higher percentage of their targeted patients than the health plan (50% vs 13%). The health plan's claims-driven targeting approach and the clinically based strategies of practices both provide advantages; an optimal model may be to combine the strengths of each approach to maximize benefits in care management.
Reaching for it. States struggle to gain new money for children's healthcare.
Gardner, J
1998-02-02
Last year's balanced-budget act authorized the creation of a state Children's Health Insurance Program and set aside federal funding for state children's healthcare plans. However, states can't get the feds' money unless they pony up some of their own dough. Not only are states worrying about how to come up with the money, they're also wondering how best to structure their children's healthcare plans.
A high-fidelity satellite ephemeris program for Earth satellites in eccentric orbits
NASA Technical Reports Server (NTRS)
Simmons, David R.
1990-01-01
A program for mission planning called the Analytic Satellite Ephemeris Program (ASEP), produces projected data for orbits that remain fairly close to the Earth. ASEP does not take into account lunar and solar perturbations. These perturbations are accounted for in another program called GRAVE, which incorporates more flexible means of input for initial data, provides additional kinds of output information, and makes use of structural programming techniques to make the program more understandable and reliable. GRAVE was revised, and a new program called ORBIT was developed. It is divided into three major phases: initialization, integration, and output. Results of the program development are presented.
Cost-Control Mechanisms in Canadian Private Drug Plans
Kratzer, Jillian; McGrail, Kimberlyn; Strumpf, Erin; Law, Michael R.
2013-01-01
Approximately 68% of Canadians receive prescription drug coverage through an employer-sponsored private plan. However, we have very limited data on the structure of these plans. This study aims to identify and describe the use of cost-control mechanisms in private drug plans in Canada and describe what private coverage looks like for the average Canadian. Using 2010 data from over 113,000 different private drug plans, provided by Applied Management Consultants, we determined the overall use of key cost-control measures, and the cost-control tools that appear to be gaining currency compared to a report on benefits coverage in 1998. We found that the use of common cost-control measures is relatively low among Canadian private benefits programs. Co-insurance is much more common in private coverage plans than co-payments. Deductibles are uncommon in Canada and, when in place, are very small. The use of annual and lifetime maximums is increasing. Canadian private benefits programs use few cost-control measures to respond to increasing costs, particularly in comparison to their public counterparts. These results suggest there are ample opportunities for greater efficiency in private sector drug coverage plans. PMID:23968672
Urban Planning and Management Information Systems Analysis and Design Based on GIS
NASA Astrophysics Data System (ADS)
Xin, Wang
Based on the analysis of existing relevant systems on the basis of inadequate, after a detailed investigation and research, urban planning and management information system will be designed for three-tier structure system, under the LAN using C/S mode architecture. Related functions for the system designed in accordance with the requirements of the architecture design of the functional relationships between the modules. Analysis of the relevant interface and design, data storage solutions proposed. The design for small and medium urban planning information system provides a viable building program.
Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)
NASA Technical Reports Server (NTRS)
Niewoehner, Kevin R.; Carter, John (Technical Monitor)
2001-01-01
The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.
Speksnijder, David C; Graveland, Haitske; Eijck, Ineke A J M; Schepers, René W M; Heederik, Dick J J; Verheij, Theo J M; Wagenaar, Jaap A
2017-06-01
Widespread veterinary use of antimicrobials might contribute to the increasing burden of antimicrobial resistance. Despite many successful efforts to reduce veterinary antimicrobial use in the Netherlands, antimicrobial use on a substantial number of farms has remained relatively high over the past few years. Farm-specific solutions are required to further lower antimicrobial use on these farms. Reducing the burden of animal diseases at the farm level by means of a structured approach to animal health planning could be promising. This intervention study aimed to evaluate the main effects of an animal health planning program developed by an advisory team consisting of a dairy farmer, his veterinarian, and his feed adviser under the guidance of a professional facilitator. During an initial farm visit, the advisory team developed a farm-specific animal health planning program with support from the facilitator. After 1 yr, the effects of this program on animal health, production parameters, and antimicrobial use were evaluated and compared with control farms that did not have a facilitated animal health planning program. Antimicrobial use on intervention farms was significantly reduced between the start and the end of the study period; however, no significant differences in the rate of reduction between the intervention and control groups could be observed (-19% and -14%, respectively). Reduced antimicrobial use did not result in negative effects on animal health and production parameters during the study period in both groups. On intervention farms, a significant positive relationship was found between the percentage of completed action points at farm level and the percentage reduction in antimicrobial use. The level of compliance with action points and the quality of collaboration between farmer and advisers were positively associated with the accomplishment of corresponding objectives. However, the total number of objectives was negatively associated with the level of compliance with action points and tended to be negatively associated with the percentage reduction in antimicrobial use at farm level. Gradually reducing antimicrobial use without adverse effects on animal health and productivity is possible by adjusting management practices in a team effort. Fostering good collaboration among farmer, veterinarian, and feed adviser and focusing on a limited number of objectives have positive effects on the outcomes of the animal health planning program and antimicrobial use. Copyright © 2017 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.
The NASA Materials Science Research Program - It's New Strategic Goals and Plans
NASA Technical Reports Server (NTRS)
Schlagheck, Ronald A.
2003-01-01
In 2001, the NASA created a separate science enterprise, the Office of Biological and Physical Research (OBPR), to perform strategical and fundamental research bringing together physics, chemistry, biology, and engineering to solve problems needed for future agency mission goals. The Materials Science Program is one of basic research disciplines within this new Enterprise's Division of Physical Sciences Research. The Materials Science Program participates to utilize effective use of International Space Station (ISS) experimental facilities, target new scientific and technology questions, and transfer results for Earth benefits. The program has recently pursued new investigative research in areas necessary to expand NASA knowledge base for exploration of the universe, some of which will need access to the microgravity of space. The program has a wide variety of traditional ground and flight based research related types of basic science related to materials crystallization, fundamental processing, and properties characterization in order to obtain basic understanding of various phenomena effects and relationships to the structures, processing, and properties of materials. A summary of the types and sources for this research is presented and those experiments planned for the space. Areas to help expand the science basis for NASA future missions are described. An overview of the program is given including the scope of the current and future NASA Research Announcements with emphasis on new materials science initiatives. A description of the planned flight experiments to be conducted on the International Space Station program along with the planned facility class Materials Science Research Rack (MSRR) and Microgravity Glovebox (MSG) type investigations.
A Model of Human Cognitive Behavior in Writing Code for Computer Programs. Volume 1
1975-05-01
nearly all programming languages, each line of code actually involves a great many decisions - basic statement types, variable and expression choices...labels, etc. - and any heuristic which evaluates code on the basis of a single decision is not likely to have sufficient power. Only the use of plans...recalculated in the following line because It was needed again. The second reason is that there are some decisions about the structure of a program
Passmore, Sandra; Donovan, Martin
2014-09-01
The Health for Life in Primary Schools Program helps schools promote healthy, active lifestyles through curriculum support related to healthy eating and cooking, growing food, physical activity, and family involvement. These interrelated strands are shown to have the greatest impact on healthy lifestyles, and the Health for Life in Primary Schools Program seeks to make these not one-off lessons, but a sustainable part of a school's culture. Each school involved with the program develops its own Action Plan in order to achieve program goals. Each school is assessed by an audit of facilities, skills, and curriculum at baseline and follow-up, and the pupils complete an on-line questionnaire at baseline and follow-up. Other impact measures are individual to the school and relate to its own Action Plan. Health for Life in Primary Schools sought to assess the cohesiveness and strength of the program using the Program Impact Pathways (PIP) model. The program was deconstructed to its individual parts, with each part assessed in terms of its contribution to the overall program and constraints upon its effectiveness. The PIP analysis helped clarify the logic and structure of the program, whether its objectives can be achieved, the Critical Quality Control Points (CCPs), and the impact measures required to demonstrate success. The core indicators identified for impact evaluation were knowledge, attitudes, and behaviors of pupils around healthy eating cooking, growing food, and physical activity. The PIP model confirmed that the Health for Life in Primary Schools Program is well structured and is well suited to achieve its goals. The findings were presented at the Healthy Lifestyles Program Evaluation Workshop held in Granada, Spain, 13-14 September 2013, under the auspices of the Mondelēz International Foundation.
The Philippine Population Program strategic plan (1981-1985).
1980-01-01
The challenge of the population problem is to effectively mobilize the country's population for productive activity. Rather than simply concern with controlling numbers, emphasis is on human resource management, the structure of employment, labor productivity and income distribution. The long-term Philippine Development Plans reflect recognition of the dynamic interaction between fertility, productivity and welfare. Objectives of the 5-Year Philippine Development Plan 1978-1982, the 10-Year Plan 1978-1987, and the Long-Term Plan to year 2000 integrate population concerns and socioeconomic goals. These objectives include the following: promotion of social development and social justice; attainment of self-sufficiency in food and greater self-reliance in energy; increased development of lagging regions, especially rural areas; improvements of habitat through the development of human settlements and proper management of the environment; and maintenance of population growth at levels conducive to national welfare. Some population concerns that are directly relevant to welfare (in addition to those related to productivity) are distribution patterns of social goods and services, access to services by sectors of the population, and buying power of families. As a total population policy should establish closer linkages, operationally, between the demographic aspects and the productivity and welfare aspects of development, the mission of the National Population Program encompasses 3 areas: fertility; productivity; and welfare. Strategic policies include the following: abortion is unacceptable as a contraceptive method; the population program shall be non-coercive; and the program shall view individual and family welfare in the context and as the main objective of national socioeconomic programs.
Spacelab - Ten years of international cooperation
NASA Technical Reports Server (NTRS)
Bignier, M.; Harrington, J. C.; Sander, M. J.
1983-01-01
The history, current status, and future plans of the Spacelab program are reviewed, with a focus on the cooperative relationship between ESA and NASA. The initial decision to undertake the program and the three agreements signed to begin its implementation are examined, and the division of responsibilities and financial contributions is discussed insofar as it affected the management structure. Consideration is given to the major facilities, the 50-mission operational cycle, communications, the currently scheduled activities (through 1985), the prospective later uses, and the ten dedicated discipline laboratories. The importance of continuous mutual support during the planning and development phases is stressed. The program so far is considered a success, in terms of the goals set by the participants and in terms of the resolution of the problems inherent in international technological endeavors.
Juggling Act: Re-Planning and Building on Observatory...Simultaneously!
NASA Technical Reports Server (NTRS)
Zavala, Eddie; Daws, Patricia
2011-01-01
SOFIA (Stratospheric Observatory for Infrared Astronomy) is a major SMD program that has been required to meet several requirements and implement major planning and business initiatives overthe past 1 1/2 years, in the midst of system development and flight test phases. The program was required to implementing JCL and EVM simultaneously, as well as undergo a major replan and Standing Review Board - and all without impacting technical schedule progress. The team developed innovative processes that met all the requirements, and improved Program Management process toolsets. The SOFIA team, being subject to all the typical budget constraints, found ways to leverage existing roles in new ways to meet the requirements without creating unmanageable overhead. The team developed strategies and value added processes - such as improved risk identification, structured reserves management, cost/risk integration - so that the effort expended resulted in a positive return to the program.
Succession Planning and Management: The Backbone of the Radiology Group's Future.
Donner, E Michael; Gridley, Daniel; Ulreich, Sidney; Bluth, Edward I
2017-01-01
The transition of leadership within radiology practices is often not a planned replacement process with formal development of potential future leaders. To ensure their ongoing success, however, practices need to develop comprehensive succession plans that include a robust developmental program for potential leaders consisting of mentoring, coaching, structured socialization, 360-degree feedback, developmental stretch assignments, job rotation, and formal education. Succession planning and leadership development will be necessary in the future for a practice to be successful in its business relationships and to be financially viable. Copyright © 2016 American College of Radiology. Published by Elsevier Inc. All rights reserved.
Training for Information Management in a Company.
ERIC Educational Resources Information Center
Karivalo, Merja
1989-01-01
Argues that information resource management is an established philosophy that needs to be linked to human resources management and strategic planning in industrial companies. A training program for information management is presented, including training objectives, participants, contents, and structure. (CLB)
The Pilot Programme for Teacher Education at Dalhousie University
ERIC Educational Resources Information Center
Bremer, Anne
1973-01-01
A program for prospective elementary school teachers was structured so that students' learning activities including continuous planning and evaluation, were metaphors for the experiences they wished to engender as professional teachers. The metaphorical principle is elaborated. (Author/JA)
Experiments of opportunity pay loads revisited
NASA Technical Reports Server (NTRS)
Shrewsberry, D. J.; Cruddace, R. G.
1986-01-01
The design and operation of the Spartan program are discussed. The objective of the Spartan program is to utilize the Space Shuttle for conducting exoatmospheric science research. The Spartan 1 data storage and handling, attitude control, power, and thermal control systems and structure are described. The Spartan 1 was to study the structure of two prominent cosmic X-ray sources, the Perseus cluster of galaxies, and the center of the Milky Way. Spartan 1 was launched on June 17, 1985, deployed on June 20, and retrieved on June 22. The performance of the Spartan's system, and the collected data are analyzed; it was observed that the systems performed as planned. The methods used to minimize the Spartan program costs are considered.
Advanced technology for America's future in space
NASA Technical Reports Server (NTRS)
1990-01-01
In response to Recommendation 8 of the Augustine Committee Report, NASA's Office of Aeronautics, Exploration and Technology (OAET) developed a proposed 'Integrated Technology Plan for the Civil Space Program' that entails substantial changes in the processes, structure and the content of NASA's space research and technology program. The Space Systems and Technology Advisory Committee (SSTAC, a subcommittee of the NASA Advisory Committee) and several other senior, expert, informed advisory groups conducted a review of NASA's proposed Integrated Technology Plan (ITP). This review was in response to the specific request in Recommendation 8 that 'NASA utilize an expert, outside review process, managed from headquarters, to assist in the allocation of technology funds'. This document, the final report from that review, addresses: (1) summary recommendations; (2) mission needs; (3) the integrated technology plan; (4) summary reports of the technical panels; and (5) conclusions and observations.
Integrating telemedicine and telehealth: putting it all together.
Weinstein, Ronald S; Lopez, Ana Maria; Krupinski, Elizabeth A; Beinar, Sandra J; Holcomb, Michael; McNeely, Richard A; Latifi, Rifat; Barker, Gail
2008-01-01
Telemedicine and telehealth programs are inherently complex compared with their traditional on-site health care delivery counterparts. Relatively few organizations have developed sustainable, multi-specialty telemedicine programs, although single service programs, such as teleradiology and telepsychiatry programs, are common. A number of factors are barriers to the development of sustainable telemedicine and telehealth programs. First, starting programs is often challenging since relatively few organizations have, in house, a critical mass of individuals with the skill sets required to organize and manage a telemedicine program. Therefore, it is necessary to "boot strap" many of the start-up activities using available personnel. Another challenge is to assemble a management team that has time to champion telemedicine and telehealth while dealing with the broad range of issues that often confront telemedicine programs. Telemedicine programs housed within a single health care delivery system have advantages over programs that serve as umbrella telehealth organizations for multiple health care systems. Planning a telemedicine program can involve developing a shared vision among the participants, including the parent organizations, management, customers and the public. Developing shared visions can be a time-consuming, iterative process. Part of planning includes having the partnering organizations and their management teams reach a consensus on the initial program goals, priorities, strategies, and implementation plans. Staffing requirements of telemedicine and telehealth programs may be met by sharing existent resources, hiring additional personnel, or outsourcing activities. Business models, such as the Application Service Provider (ASP) model used by the Arizona Telemedicine Program, are designed to provide staffing flexibility by offering a combination of in-house and out-sourced services, depending on the needs of the individual participating health care organizations. Telemedicine programs should perform ongoing assessments of activities, ranging from service usage to quality of service assessments, to ongoing analyses of financial performance. The financial assessments should include evaluations of costs and benefits, coding issues, reimbursement, account receivables, bad debt and network utilization. Long-range strategic planning for a telemedicine and telehealth program should be carried out on an on-going basis and should include the program's governing board. This planning process should include goal setting and the periodic updating of the program's vision and mission statements. There can be additional special issues for multi-organization telemedicine and telehealth programs. For example, authority management can require the use of innovative approaches tailored to the realities of the organizational structures of the participating members. Inter-institutional relations may introduce additional issues when competing health care organizations are utilizing shared resources. Branding issues are preferably addressed during the initial planning of a multi-organizational telemedicine and telehealth program. Ideally, public policy regarding telemedicine and telehealth within a service region will complement the objectives of telemedicine and telehealth programs within that service area.
Cao, Wenhua; Lim, Gino; Li, Xiaoqiang; Li, Yupeng; Zhu, X. Ronald; Zhang, Xiaodong
2014-01-01
The purpose of this study is to investigate the feasibility and impact of incorporating deliverable monitor unit (MU) constraints into spot intensity optimization in intensity modulated proton therapy (IMPT) treatment planning. The current treatment planning system (TPS) for IMPT disregards deliverable MU constraints in the spot intensity optimization (SIO) routine. It performs a post-processing procedure on an optimized plan to enforce deliverable MU values that are required by the spot scanning proton delivery system. This procedure can create a significant dose distribution deviation between the optimized and post-processed deliverable plans, especially when small spot spacings are used. In this study, we introduce a two-stage linear programming (LP) approach to optimize spot intensities and constrain deliverable MU values simultaneously, i.e., a deliverable spot intensity optimization (DSIO) model. Thus, the post-processing procedure is eliminated and the associated optimized plan deterioration can be avoided. Four prostate cancer cases at our institution were selected for study and two parallel opposed beam angles were planned for all cases. A quadratic programming (QP) based model without MU constraints, i.e., a conventional spot intensity optimization (CSIO) model, was also implemented to emulate the commercial TPS. Plans optimized by both the DSIO and CSIO models were evaluated for five different settings of spot spacing from 3 mm to 7 mm. For all spot spacings, the DSIO-optimized plans yielded better uniformity for the target dose coverage and critical structure sparing than did the CSIO-optimized plans. With reduced spot spacings, more significant improvements in target dose uniformity and critical structure sparing were observed in the DSIO- than in the CSIO-optimized plans. Additionally, better sparing of the rectum and bladder was achieved when reduced spacings were used for the DSIO-optimized plans. The proposed DSIO approach ensures the deliverability of optimized IMPT plans that take into account MU constraints. This eliminates the post-processing procedure required by the TPS as well as the resultant deteriorating effect on ultimate dose distributions. This approach therefore allows IMPT plans to adopt all possible spot spacings optimally. Moreover, dosimetric benefits can be achieved using smaller spot spacings. PMID:23835656
Strategic Alliances: Making a Difference One Warfighter At a Time
2011-03-12
Prototype Integration Planning Machining / CNC / Metals Welding Assembly / Paint Integration •Field-Experienced Veterans •Component, Subsystems...Wiring Harness •CAD/CAM CNC Programming •Quick reaction of parts - CNC , Lathes, Mills, Water Jet/Laser Cutting Design •Mechanical, Electrical...DEFORMATION RESISTANCE WELDING • Tubular Structural welding, Light weight structures COMBINED PLASMA -MIG ARC WELDING • Faster than any other
ERIC Educational Resources Information Center
Kokko, Suvi; Lagerkvist, Carl Johan
2017-01-01
Using a case example of an innovative sanitation solution in a slum setting, this study explores the usefulness of the Zaltman Metaphor Elicitation Technique in a program planning and evaluation context. Using a qualitative image-based method to map people's mental models of ill-structured problems such as sanitation can aid program planners and…
Luzze, Henry; Badiane, Ousseynou; Mamadou Ndiaye, El Hadji; Ndiaye, Annette Seck; Atuhaire, Brian; Atuhebwe, Phionah; Guinot, Phillippe; Fry Sosne, Erin; Gueye, Abdoulaye
2017-04-19
As immunization programs around the world undergo rapid change and expansion, supply chain and logistics systems have become strained, making it increasingly challenging for national public health systems to provide reliable, safe, and efficient access to vaccines. Governments and immunization partners have been aware of this problem for several years, and in 2010, the World Health Organization (WHO) launched the Effective Vaccine Management (EVM) process to help countries identify shortcomings in their immunization supply chains and develop plans for systematic improvement. EVM improvement plans now exist in all Gavi-eligible countries plus many middle- and upper-income countries; however, implementation has been slow and in many cases fraught with financial, managerial, structural, and political roadblocks. Recognizing that significant change of any kind requires a supportive policy environment and strong leadership, PATH began working in Uganda and Senegal to landscape the policy environment around immunization and identify relevant policies, administrative and technical roles and responsibilities, and other issues that may be affecting the supply chain for immunization. The policy landscape assessments included a desk review and a series of structured, in-depth interviews with key international, national, and local stakeholders. The findings highlighted a number of critical issues and challenges in both countries that may be preventing supply chains from functioning optimally. These challenges include a need for better coordination and planning between immunization programs and supply chain managers; the need for sufficient, timely and reliable financing for all aspects of immunization programs; the need for high-level managers trained in immunization supply chain management; and an urgent need for better, more timely data for decision-making. Overcoming these challenges will require the involvement of high-level political actors-including ministers of health and finance, parliamentarians, and other officials who have the ability to approve and influence policy, personnel, and structural changes; ensure work plans are backed with adequate resources for implementation; and hold program managers accountable for achieving agreed indicators. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.
The Acceptance Strategy for Nuclear Power Plant In Indonesia
NASA Astrophysics Data System (ADS)
Suhaemi, Tjipta; Syaukat, Achmad
2010-06-01
THE ACCEPTANCE STRATEGY FOR NUCLEAR POWER PLANT IN INDONESIA. Indonesia has planned to build nuclear power plants. Some feasibility studies have been conducted intensively. However, the processes of NPP introduction are still uncertain. National Energy Plan in Indonesia, which has been made by some governmental agencies, does not yet give positive impact to the government decision to construct the nuclear power plant (NPP). This paper discusses the process of NPP introduction in Indonesia, which has been colored with debate of stakeholder and has delayed decision for go-nuclear. The technology paradigm is used to promote NPP as an alternative of reliable energy resources. This paradigm should be complemented with international politic-economic point of view. The international politic-economic point of view shows that structural powers, consisting of security, production, finance, and knowledge structures, within which the NPP is introduced, have dynamic characteristics. The process of NPP introduction in Indonesia contains some infrastructure development (R&D, legislation, regulation, energy planning, site study, public acceptance efforts, etc), but they need a better coherent NPP implementation program and NPP Acceptance Program. Strategic patterns for NPP acceptance described in this paper are made by considering nuclear regulation development and the interest of basic domestic participation. The first NPP program in Indonesia having proven technology and basic domestic participation is and important milestone toward and optimal national energy-mix.
NASA Astrophysics Data System (ADS)
Levia, Delphis
2013-04-01
The achievement of sustainable use of our natural world is one of the major issues confronting humankind today. Environmental issues are inherently complex and difficult to resolve. Successful resolution of our most pressing environmental problems, such as climate change and ocean acidification, will require well-trained earth and environmental scientists that think critically in a multi-dimensional framework at variable spatial and temporal scales. This begs the question as to how we can both attract and successfully educate students in such a way that will permit them to tackle the multitude of environmental problems currently facing society. This poster details one way to successfully attract and train students in an interdisciplinary environmental education framework by sharing: (1) some of the successful strategies and programmatic structure of the University of Delaware's undergraduate environmental programs that have grown over 60% in two years after a major programmatic revision; and (2) the current round of programmatic revisions that will complete the strategic planning process.* The interdisciplinary environmental education program at the University of Delaware has a strong programmatic core that provides students with the requisite quantitative training and field experience to solve complicated environmental issues. At the same time, the environmental program includes the social, political, and economic contexts of environmental issues. Together, these two parts of the core best equip students to mitigate environmental problems. Following a strategic planning effort, the University of Delaware is building upon past successes in training environmental scientists and managers by further reformulating its environmental programs to leverage the power of theme-based learning which complements the programmatic core in such a way to teach problem-solving skills. This poster details the multidimensional nature of the University of Delaware's environmental programs and the revised program structure that seeks to strike a balance between quantitative science, adaptive management, and solutions oriented thinking. ------------------------ *Please note that the planning process for the environmental programs was and is the collective effort of many dedicated people. Current members of the advisory Environmental Council include Drs. Delphis Levia (Program Director), Nancy Targett (Dean and Council Chair), Frank Newton, Tracy Deliberty, Tom Sims, John Madsen, Paul Imhoff, Jan Johnson, Jerry Kauffman, Murray Johnston.
Findings from a mixed-methods study of an interprofessional faculty development program.
Abu-Rish Blakeney, Erin; Pfeifle, Andrea; Jones, Mandy; Hall, Leslie Walter; Zierler, Brenda K
2016-01-01
Forty faculty members from eight schools participated in a year-long National Faculty Development Program (NFDP) conducted in 2012-2013, aimed at developing faculty knowledge and skills for interprofessional education (IPE). The NFDP included two live conferences. Between conferences, faculty teams implemented self-selected IPE projects at their home institutions and participated in coaching and peer-support conference calls. This paper describes program outcomes. A mixed methods approach was adopted. Data were gathered through online surveys and semi-structured interviews. The study explored whether faculty were satisfied with the program, believed the program was effective in developing knowledge and skills in designing, implementing, and evaluating IPE, and planned to continue newly-implemented IPE and faculty development (FD). Peer support and networking were two of the greatest perceived benefits. Further, this multi-institutional program appears to have facilitated early organizational change by bringing greater contextual understanding to assumptions made at the local level that in turn could influence hidden curricula and networking. These findings may guide program planning for future FD to support IPE.
Reid Ponte, Patricia; Hayman, Laura L; Berry, Donna L; Cooley, Mary E
2015-01-01
The University of Massachusetts Boston and Dana-Farber/Harvard Cancer Center joined forces in 2009 to create a Postdoctoral Nursing Research Fellowship in Cancer and Health Disparities. In combining the resources of a large university and a research-intensive service institution, the postdoctoral program provides a new model for preparing nurse scientists to conduct independent research that advances nursing knowledge and interdisciplinary understanding of complex health issues. The multifaceted program consists of educational programming, research training, and career planning components. Additionally, each fellow is assigned a nurse scientist mentor and interdisciplinary co-mentor. The mentors support the fellows with scholarly activities and research training and help the fellows craft individualized career plans, including proposals for postfellowship career development research. In this article, the postdoctoral program leaders describe the program structure, strategies used to recruit minority and nonminority candidates, and data describing program outcomes and share lessons learned and recommendations for organizations that may be interested in establishing similar postdoctoral fellowships at their institutions. Copyright © 2015 Elsevier Inc. All rights reserved.
Florence, Curtis S; Atherly, Adam; Thorpe, Kenneth E
2006-10-01
. To examine the effect of premiums and benefits on the health plan choices of older enrollees who choose Federal Employees Health Benefits Program (FEHBP) health plans as their primary payer. Administrative enrollment data from the Office of Personnel Management (OPM) and plan premiums and benefits data taken from the Checkbook Guide to health plans. We estimate individual plan choice models where the choice of health plan is a function of out-of-pocket premium, actuarial value, plan attributes, and individual characteristics. Plan attributes include plan structure (fee-for-service/preferred provider organization, point-of-service, or health maintenance organization), drug benefit structure, and whether or not the plan covers other types of spending such as dental services and diabetic supplies. The models are estimated by conditional logit. Our study focuses on three populations that currently choose FEHBP as their primary health care coverage and are similar to the Medicare population: current employees and retirees who are approaching the age of Medicare eligibility (ages 60-64) and current federal employees age 65+. Current employees age 65+ are eligible for Medicare, but their FEHBP plan is their primary payer. Retirees and employees 60-64 are not yet eligible for Medicare but are similar in many respects to recently age-eligible Medicare beneficiaries. We also estimate our model for current employees age 55 and younger as a comparison group. We select a random sample of retirees and employees age 60-64, as well as all current employees age 65+, from the OPM administrative database for the calendar year 2001. The plan choices available to each person are determined by the plans participating in their metropolitan statistical area. We match plan premium and attribute information from the Checkbook Guide to each plan in the enrollee's list of choices. We find that current workers 65+, 60-64, and non-Medicare eligible retirees are sensitive to variation in plan premiums. The premium elasticities for these groups are similar in magnitude to those of the age 55 and under employee group. Older workers and retirees not yet eligible for Medicare are willing to pay a substantial amount for plans with open provider networks. The willingness to pay for open networks is significantly greater for these groups than for younger employees. Willingness to pay for open network plans varies significantly by income, but varies little by age within group. Our finding that older workers and non-Medicare eligible retirees are sensitive to plan premiums suggests that choice-based reform of Medicare would lead to cost-conscious choices by Medicare beneficiaries. However, our finding that these groups are willing to pay more for open network plans than younger employees suggest that higher risk individuals may migrate toward higher benefit, higher cost plans. Our findings on the relationship between income and willingness to pay for open network plans suggest that means testing is a viable reform for lowering Medicare program costs.
Spacelab shaping space operations planning
NASA Technical Reports Server (NTRS)
Steven, F. R.; Reinhold, C.
1976-01-01
An up-to-date picture is presented of the organizational structure, the key management personnel, and management relationships of the Spacelab program. Attention is also given to Spacelab's development status and plans for its operations. A number of charts are provided to illustrate the organizational relations. It is pointed out that the parties involved in Spacelab activities must yet resolve questions about ownership of transportation-system elements, payloads, ground support facilities, and data obtained from space missions.
Hospital renovation projects: phased construction requires planning at its best.
Cox, J C
1986-01-01
Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.
Software for Probabilistic Risk Reduction
NASA Technical Reports Server (NTRS)
Hensley, Scott; Michel, Thierry; Madsen, Soren; Chapin, Elaine; Rodriguez, Ernesto
2004-01-01
A computer program implements a methodology, denoted probabilistic risk reduction, that is intended to aid in planning the development of complex software and/or hardware systems. This methodology integrates two complementary prior methodologies: (1) that of probabilistic risk assessment and (2) a risk-based planning methodology, implemented in a prior computer program known as Defect Detection and Prevention (DDP), in which multiple requirements and the beneficial effects of risk-mitigation actions are taken into account. The present methodology and the software are able to accommodate both process knowledge (notably of the efficacy of development practices) and product knowledge (notably of the logical structure of a system, the development of which one seeks to plan). Estimates of the costs and benefits of a planned development can be derived. Functional and non-functional aspects of software can be taken into account, and trades made among them. It becomes possible to optimize the planning process in the sense that it becomes possible to select the best suite of process steps and design choices to maximize the expectation of success while remaining within budget.
NASA aeronautics R&T - A resource for aircraft design
NASA Technical Reports Server (NTRS)
Olstad, W. B.
1981-01-01
This paper discusses the NASA aeronautics research and technology program from the viewpoint of the aircraft designer. The program spans the range from fundamental research to the joint validation with industry of technology for application into product development. Examples of recent developments in structures, materials, aerodynamics, controls, propulsion systems, and safety technology are presented as new additions to the designer's handbook. Finally, the major thrusts of NASA's current and planned programs which are keyed to revolutionary advances in materials science, electronics, and computer technology are addressed.
16 CFR 1000.12 - Organizational structure.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) Office of Human Resources Management; (6) Office of Information and Technology Services; (7) Office of International Programs and Intergovernmental Affairs. (c) The following units report directly to the Assistant...) Office of Financial Management, Planning and Evaluation; (2) Office of Hazard Identification and...
16 CFR § 1000.12 - Organizational structure.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Operations; (5) Office of Human Resources Management; (6) Office of Information and Technology Services; (7) Office of International Programs and Intergovernmental Affairs. (c) The following units report directly... the Commission: (1) Office of Financial Management, Planning and Evaluation; (2) Office of Hazard...
16 CFR 1000.12 - Organizational structure.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) Office of Human Resources Management; (6) Office of Information and Technology Services; (7) Office of International Programs and Intergovernmental Affairs. (c) The following units report directly to the Assistant...) Office of Financial Management, Planning and Evaluation; (2) Office of Hazard Identification and...
Creative C.O.W. or a Moo Is Worth a Thousand Words.
ERIC Educational Resources Information Center
Bowers, Arla
1987-01-01
A teacher details a method, the Creative Concrete Operational Writing (Creative C.O.W.) program to provide an individualized structured approach to creative writing in the primary grades. Sample story plans and worksheets are included. (DB)
Treatment Planning and Image Guidance for Radiofrequency Ablations of Large Tumors
Ren, Hongliang; Campos-Nanez, Enrique; Yaniv, Ziv; Banovac, Filip; Abeledo, Hernan; Hata, Nobuhiko; Cleary, Kevin
2014-01-01
This article addresses the two key challenges in computer-assisted percutaneous tumor ablation: planning multiple overlapping ablations for large tumors while avoiding critical structures, and executing the prescribed plan. Towards semi-automatic treatment planning for image-guided surgical interventions, we develop a systematic approach to the needle-based ablation placement task, ranging from pre-operative planning algorithms to an intra-operative execution platform. The planning system incorporates clinical constraints on ablations and trajectories using a multiple objective optimization formulation, which consists of optimal path selection and ablation coverage optimization based on integer programming. The system implementation is presented and validated in phantom studies and on an animal model. The presented system can potentially be further extended for other ablation techniques such as cryotherapy. PMID:24235279
Child saving and child spacing in Africa: the evolution of a concept.
Wright, R D
1973-01-01
In 1963 neither the Nigerian Society of Health nor anyone in the power structure of Nigeria would publicly endorse family planning. By early 1968 a family planning day was declared where it was proclaimed that the quality of the people was important not the quantity. However Nigeria still does not have a family planning program that reaches a large percentage of the women at risk. The first phase is a quiet beginning, the second is the achievement of acceptance, the third is to train teachers, and the fourth phase is the establishment of maternal-child care services. This last phase may incorporate the family planning services. Is hoped that this will lead to a more favorable attitude toward family planning.
Global Precipitation Measurement (GPM) Ground Validation: Plans and Preparations
NASA Technical Reports Server (NTRS)
Schwaller, M.; Bidwell, S.; Durning, F. J.; Smith, E.
2004-01-01
The Global Precipitation Measurement (GPM) program is an international partnership led by the National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA). GPM will improve climate, weather, and hydro-meteorological forecasts through more frequent and more accurate measurement of precipitation across the globe. This paper describes the concept, the planning, and the preparations for Ground Validation within the GPM program. Ground Validation (GV) plays an important role in the program by investigating and quantitatively assessing the errors within the satellite retrievals. These quantitative estimates of retrieval errors will assist the scientific community by bounding the errors within their research products. The two fundamental requirements of the GPM Ground Validation program are: (1) error characterization of the precipitation retrievals and (2) continual improvement of the satellite retrieval algorithms. These two driving requirements determine the measurements, instrumentation, and location for ground observations. This paper outlines GV plans for estimating the systematic and random components of retrieval error and for characterizing the spatial p d temporal structure of the error and plans for algorithm improvement in which error models are developed and experimentally explored to uncover the physical causes of errors within the retrievals. This paper discusses NASA locations for GV measurements as well as anticipated locations from international GPM partners. NASA's primary locations for validation measurements are an oceanic site at Kwajalein Atoll in the Republic of the Marshall Islands and a continental site in north-central Oklahoma at the U.S. Department of Energy's Atmospheric Radiation Measurement Program site.
Fassier, J-B; Lamort-Bouché, M; Sarnin, P; Durif-Bruckert, C; Péron, J; Letrilliart, L; Durand, M-J
2016-02-01
Health promotion programs are expected to improve population health and reduce social inequalities in health. However, their theoretical foundations are frequently ill-defined, and their implementation faces many obstacles. The aim of this article is to describe the intervention mapping protocol in health promotion programs planning, used recently in several countries. The challenges of planning health promotion programs are presented, and the six steps of the intervention mapping protocol are described with an example. Based on a literature review, the use of this protocol, its requirements and potential limitations are discussed. The intervention mapping protocol has four essential characteristics: an ecological perspective (person-environment), a participative approach, the use of theoretical models in human and social sciences and the use of scientific evidence. It comprises six steps: conduct a health needs assessment, define change objectives, select theory-based change techniques and practical applications, organize techniques and applications into an intervention program (logic model), plan for program adoption, implementation, and sustainability, and generate an evaluation plan. This protocol was used in different countries and domains such as obesity, tobacco, physical activity, cancer and occupational health. Although its utilization requires resources and a critical stance, this protocol was used to develop interventions which efficacy was demonstrated. The intervention mapping protocol is an integrated process that fits the scientific and practical challenges of health promotion. It could be tested in France as it was used in other countries, in particular to reduce social inequalities in health. Copyright © 2016. Published by Elsevier Masson SAS.
28 CFR 70.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Revision of budget and program plans. 70... Revision of budget and program plans. (a) The budget plan is the financial expression of the project or... from budget and program plans, and request prior approvals for budget and program plan revisions, in...
45 CFR 2543.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Revision of budget and program plans. 2543.25... Revision of budget and program plans. (a) The budget plan is the financial expression of the project or... deviations from budget and program plans, and request prior approvals for budget and program plan revisions...
The background and theory of integrated risk management
NASA Technical Reports Server (NTRS)
Hunsucker, John L.
1995-01-01
While all good managers have always considered risk in their decision making, only recently have formal programs to do so been introduced. This report covers the logical structure behind the formulation of an integrated risk management plan (IRM). Included in the report are factors forcing the development of a formal plan to consider risk, the basic objective or purpose of an IRM, and desirable traits of such a plan. The report moves on to a discussion of background issues, seeks to formalize some definitions, and then discusses required information on threats. The report concludes with the steps for an IRM.
Structural dynamics and control of large space structures. [conference
NASA Technical Reports Server (NTRS)
Lightner, E. B. (Compiler)
1981-01-01
The focus of the workshop was the basic research program assembled by LaRC to address the fundamental technology deficiencies that were identified in several studies on large space systems (LSS) conducted by NASA in the last several years. The staffs of the respective participants were assembled at the workshop to review the current state of research in the control technology for large structural systems and to plan the efforts that would be pursued by their respective organizations.
Virtual university applied to telesurgery: from teleeducation to telemanipulation.
Marescaux, J; Soler, L; Mutter, D; Leroy, J; Vix, M; Koehl, C; Clément, J M
2000-01-01
PROBLEM/BACKGROUND: In order to improve patient care by minimal invasive surgery (MIS), we perfected a Virtual TeleSurgical University that allows for teleeducation, teleconcertation, surgical planning and telemanipulation, through new Virtual Reality and multimedia systems. The organization of this innovative school was federated around three major research programs. First, the TESUS program focused on the teletransmission of medical information, allowing for videoconferencing around the world and telementoring. Next, the WeBS-Surg program is a multimedia continuous surgical education system on internet, that allows for teleeducation and teleconcertation between world experts in MIS. Then, the MASTER program (Minimal Access Surgery by Telecommunications and Robotics) allowed the development of the third millenium Operating room. It included Virtual Reality systems that delineate automatically anatomical and pathological structures of a patients from him CT-scan, and that allow for an interactive surgical planning and force-feed-back simulation. It also included a telesurgical robot named Zeus controlled by surgeons through telemanipulation system. Tests and validation shows that all these systems improved all steps of the surgical procedure: preoperatively due to a better continuous education and a computer assisted surgical planning, and peroperatively due to teleconcertation, telementoring and telemanipulation systems. Revolutionary tools for minimal invasive surgery learning, planning and performing are all ready available. These tools represents the first prototype of the computer assisted tele-robotical surgery that will be the future of surgery.
Overview of an Advanced Hypersonic Structural Concept Test Program
NASA Technical Reports Server (NTRS)
Stephens, Craig A.; Hudson, Larry D.; Piazza, Anthony
2007-01-01
This viewgraph presentation provides an overview of hypersonics M&S advanced structural concepts development and experimental methods. The discussion on concepts development includes the background, task objectives, test plan, and current status of the C/SiC Ruddervator Subcomponent Test Article (RSTA). The discussion of experimental methods examines instrumentation needs, sensors of interest, and examples of ongoing efforts in the development of extreme environment sensors.
Can a Reaction's Environment Program its Outcome, and Does it Matter?
NASA Astrophysics Data System (ADS)
Surman, A. J.; Rodriguez-Garcia, M.; Abul-Haija, Y.; Cooper, G. J. T.; Donkers, K.; Planchat i Barbarà, J. M.; Kube, J.; Mullin, M.; Hezwani, M.; Cronin, L.
2017-07-01
Where most eschew reactions producing complex mixtures (‘tar') and prefer to plan ‘clean' syntheses, we embrace complexity. We show that environments can steer ‘messy' reactions, and ask if this can yield significant difference in structure and function.
ERIC Educational Resources Information Center
O'Donnell, John F.
1968-01-01
Traditional English curriculums are giving way to new English programs built on the foundations of research and scholarship. The "new" English, being developed by the Project English Centers throughout the country, attempts to utilize the characteristic structure of the subject to plan sequential and spiral curriculums replacing outdated…
NASA Technical Reports Server (NTRS)
1968-01-01
Contents include the following: General release. Mission objectives. Mission description. Flight plan. Alternate missions. Experiments. Abort model. Spacecraft structure system. The Saturn 1B launch vehicle. Flight sequence. Launch preparations. Mission control center-Houston. Manned space flight network. Photographic equipment. Apollo 7 crew. Apollo 7 test program.
Space Transportation Materials and Structures Technology Workshop. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Cazier, F. W., Jr. (Compiler); Gardner, J. E. (Compiler)
1992-01-01
The workshop was held to provide a forum for communication within the space materials and structures technology developer and user communities. Workshop participants were organized into a Vehicle Technology Requirements session and three working panels: Materials and Structures Technologies for Vehicle Systems; Propulsion Systems; and Entry Systems. The goals accomplished were (1) to develop important strategic planning information necessary to transition materials and structures technologies from lab research programs into robust and affordable operational systems; (2) to provide a forum for the exchange of information and ideas between technology developers and users; and (3) to provide senior NASA management with a review of current space transportation programs, related subjects, and specific technology needs. The workshop thus provided a foundation on which a NASA and industry effort to address space transportation materials and structures technologies can grow.
Human Research Program: Long Duration, Exploration-Class Mission Training Design
NASA Technical Reports Server (NTRS)
Barshi, Immanuel; Dempsey, Donna L.
2016-01-01
This is a presentation to the International Training Control Board that oversees astronaut training for ISS. The presentation explains the structure of HRP, the training-related work happening under the different program elements, and discusses in detail the research plan for the Training Risk under SHFHSHFE. The group includes the crew training leads for all the space agencies involved in ISS: Japan, Europe, Russia, Canada, and the US.
The Economics of Energy Independence for Iran
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wood, Thomas W.; Milazzo, Matthew D.; Reichmuth, Barbara A.
2007-03-01
Iran has pursued an ambitious nuclear program with the declared goal of long-term energy independence. While this is a worthwhile and generally accepted national planning objective, it is clear that the nuclear program as now structured will not achieve it, and in fact may delay it by diverting capital and other resources from projects that would address pressing current energy sector problems and contribute to ultimate energy independence.
The J-Staff System, Network Synchronisation and Noise
2014-06-01
GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S... work . A key challenge of such structures is their tendency to fall into extreme dynamical modes. One is a ‘two-speed’ mode, where units interacting with...longer term planning, led by the J5 Planning Branch, fall into a slow cycle of work , while those entities interacting predominately with operations
NASA Technical Reports Server (NTRS)
Johnson, V. T.
1972-01-01
This Phase 2 final report for the B-70 aircraft study contains the data location matrix, which provides a summary of the major cost, schedule, and technical items provided in the report; work breakdown structure; cost definitions; and B-70 program level summary data. The Phase 2 objective was to provide the B-70 aircraft data in accordance with the approved study plan. Several minor modifications to the original plan have been made as the result of the Phase 2 effort.
2012-02-13
Operations DCMO Deputy Chief Management Officer DDRS Defense Departmental Reporting System DFAS Defense Finance and Accounting Service ERP Enterprise...for your review and comment. The Navy approved deployment of the Navy Enterprise Resource Planning ( ERP ) System without ensuring it complied with the...Comments from the Deputy Assistant Secretary of the Navy (Financial Management and Comptroller, Office of Financial Operations) and the Navy ERP Program
Geological evaluation of Radarsat data: Plans and preliminary results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berger, Z.; Irving, R.E.L.; Thompson, M.D.
1996-01-01
Radarsat, the Canadian synthetic aperture radar satellite to be launched in September 1995, is anticipated to become the prime active imaging system for geological mapping of tropical areas and other humid areas. Radarsat will provide adequate spatial resolution, stereo capabilities and relatively low incidence angles to reduce the geometric distortions of geological structures due to layover effects. As part of the Radarsat User Development Program of the Canadian Space Agency, it has been proposed to conduct an evaluation program of the terrain surface mapping capabilities of Radarsat and its application to hydrocarbon exploration, coal development, geological hazard mapping and environmentalmore » monitoring. The evaluation program will be carried out in three test sites: (1) Western Canadian Basin (a mature exploration area in Alberta with a range of geology/topography), (2) Andean Foothills (frontier tropical sedimentary basins in Columbia representing prototype active exploration areas), and (3) Philippine volcanic region (frontier tropical earthquake-prone geohazard area of Philippine wrench fault system on Luzon Island, in a typical structural setting of the sedimentary basins of southeast Asia). The paper will include the project plans, illustrate the structural setting and the relationships between surface and subsurface structures for each of the three test sites, and present a preliminary evaluation of simulated and actual Radarsat data as compared to data from ERS-1, airborne SAR, Landsat Thematic Mapper and SPOT. The preliminary application of Radarsat for exploration will be discussed.« less
Geological evaluation of Radarsat data: Plans and preliminary results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berger, Z.; Irving, R.E.L.; Thompson, M.D.
1996-12-31
Radarsat, the Canadian synthetic aperture radar satellite to be launched in September 1995, is anticipated to become the prime active imaging system for geological mapping of tropical areas and other humid areas. Radarsat will provide adequate spatial resolution, stereo capabilities and relatively low incidence angles to reduce the geometric distortions of geological structures due to layover effects. As part of the Radarsat User Development Program of the Canadian Space Agency, it has been proposed to conduct an evaluation program of the terrain surface mapping capabilities of Radarsat and its application to hydrocarbon exploration, coal development, geological hazard mapping and environmentalmore » monitoring. The evaluation program will be carried out in three test sites: (1) Western Canadian Basin (a mature exploration area in Alberta with a range of geology/topography), (2) Andean Foothills (frontier tropical sedimentary basins in Columbia representing prototype active exploration areas), and (3) Philippine volcanic region (frontier tropical earthquake-prone geohazard area of Philippine wrench fault system on Luzon Island, in a typical structural setting of the sedimentary basins of southeast Asia). The paper will include the project plans, illustrate the structural setting and the relationships between surface and subsurface structures for each of the three test sites, and present a preliminary evaluation of simulated and actual Radarsat data as compared to data from ERS-1, airborne SAR, Landsat Thematic Mapper and SPOT. The preliminary application of Radarsat for exploration will be discussed.« less
Ponte, Patricia Reid; Hayman, Laura L; Berry, Donna L; Cooley, Mary E
2016-01-01
The University of Massachusetts Boston and Dana-Farber/Harvard Cancer Center joined forces in 2009 to create a Postdoctoral Nursing Research Fellowship in Cancer and Health Disparities. In combining the resources of a large university and a research-intensive service institution, the postdoctoral program provides a new model for preparing nurse scientists to conduct independent research that advances nursing knowledge and interdisciplinary understanding of complex health issues. The multi-faceted program consists of educational programming, research training, and career planning components. Additionally, each fellow is assigned a nurse scientist mentor and interdisciplinary co-mentor. The mentors support the fellows with scholarly activities and research training and help the fellows craft individualized career plans, including proposals for post-fellowship career development research. In this article, the postdoctoral program leaders describe the program structure, strategies used to recruit minority and non-minority candidates, and data describing program outcomes, and share lessons learned and recommendations for organizations that may be interested in establishing similar postdoctoral fellowships at their institutions. PMID:25771193
Developing an educational safety program for pharmacy employees.
Hayman, J N
1980-02-01
The need for developing educational safety programs for pharmacy employees is discussed. A three-part program is offered as a guide for structuring a departmental safety program. Part I deals with environmental hazards such as wet floors, poor lighting, and cluttered walk areas. Precautions that should be taken to avoid accidental exposure to patients with communicable diseases are also included. Hazards that may result from improper handling of materials or equipment are addressed in Part II. Included are precautions for handling chemicals, needles, ladders, and electrical equipment. Proper methods of lifting heavy objects are also discussed. Part III details plans to protect staff members in the event of a fire. Plans for reporting fires and evacuating the pharmacy and hospital are discussed. The outlined program requires self-study by staff members during initial employee orientation, followed by annual retraining. Employees are tested and graded on safety topics, and training records are filed for future reference. The program outlined is thought to offer a simple yet effective means of acquainting staff members with established institutional and departmental safety procedures.
Applications of tethers in space: A review of workshop recommendations
NASA Technical Reports Server (NTRS)
Vontiesenhausen, G. (Editor)
1986-01-01
Well-organized and structured efforts of considerable magnitude involving NASA, industry, and academia have explored and defined the engineering and technological requirements of the use of tethers in space and have discovered their broad range of operational and economic benefits. The results of these efforts have produced a family of extremely promising candidate applications. The extensive efforts now in progress are gaining momentum and a series of flight demonstrations are being planned and can be expected to take place in a few years. This report provides an analysis and a review of NASA's second major workshop on Applications of Tethers in Space held in October 15 to 17, 1985, in Venice, Italy. It provides a summary of an up-to-date assessment and recommendations by the NASA Tether Applications in Space Program Planning Group, consisting of representatives of seven NASA Centers and responsible for tether applications program planning implementation as recommended by the workshop panels.
National space transportation systems planning
NASA Technical Reports Server (NTRS)
Lucas, W. R.
1985-01-01
In the fall of 1984, the DOD and NASA had been asked to identify launch vehicle technologies which could be made available for use in 1995 to 2010. The results of the studies of the two groups were integrated, and a consumer report, dated December 1984, was forwarded to the President. Aspects of mission planning and analysis are discussed along with a combined mission model, future launch system requirements, a launch vehicle planning background, Shuttle derivative vehicle program options, payload modularization, launch vehicle technology implications, a new engine program for the mid-1990's. Future launch systems goals are to achieve an order of magnitude reduction in future launch cost and meet the lift requirements and launch rates. Attention is given to an advanced cryogenic engine, advanced LOX/hydrocarbon engine, advanced power systems, aerodynamics/flight mechanics, reentry/recovery systems, avionics/software, advanced manufacturing techniques, autonomous ground and mission operations, advanced structures/materials, and air breathing propulsion.
Control/structure interaction design methodology
NASA Technical Reports Server (NTRS)
Briggs, Hugh C.; Layman, William E.
1989-01-01
The Control Structure Interaction Program is a technology development program for spacecraft that exhibit interactions between the control system and structural dynamics. The program objectives include development and verification of new design concepts (such as active structure) and new tools (such as a combined structure and control optimization algorithm) and their verification in ground and possibly flight test. The new CSI design methodology is centered around interdisciplinary engineers using new tools that closely integrate structures and controls. Verification is an important CSI theme and analysts will be closely integrated to the CSI Test Bed laboratory. Components, concepts, tools and algorithms will be developed and tested in the lab and in future Shuttle-based flight experiments. The design methodology is summarized in block diagrams depicting the evolution of a spacecraft design and descriptions of analytical capabilities used in the process. The multiyear JPL CSI implementation plan is described along with the essentials of several new tools. A distributed network of computation servers and workstations was designed that will provide a state-of-the-art development base for the CSI technologies.
Forrow, Susan; Campion, Daniel M; Herrinton, Lisa J; Nair, Vinit P; Robb, Melissa A; Wilson, Marcus; Platt, Richard
2012-01-01
The US Food and Drug Administration's Mini-Sentinel pilot program is developing an organizational structure as well as principles and policies to govern its operations. These will inform the structure and function of the eventual Sentinel System. Mini-Sentinel is a collaboration that includes 25 participating institutions. We describe the program's current organizational structure and its major principles and policies. The organization includes a coordinating center with program leadership provided by a principal investigator; a planning board and subcommittees; an operations center; and data, methods, and protocol cores. Ad hoc workgroups are created as needed. A privacy panel advises about protection of individual health information. Principles and policies are intended to ensure that Mini-Sentinel conforms to the principles of fair information practices, protects the privacy of individual health information, maintains the security and integrity of data, assures the confidentiality of proprietary information, provides accurate and timely communications, prevents or manages conflicts of interest, and preserves respect for intellectual property rights. Copyright © 2012 John Wiley & Sons, Ltd.
A case study of middle size floating airports for shallower and deeper waters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoshida, Koichiro; Suzuki, Hideyuki; Nishigaki, Makoto
1996-12-31
Demands for large and middle size airports are expanding in Japan with continuous increase of air transportation. However these demands will not be satisfied without effective ocean space utilization. Most of the wide and shallower waters suitable for reclamation have already been reclaimed. Furthermore those shallower waters are generally close to the residential area, and noise and environmental problems will be caused if they were used for airports. Deeper waters, which are relatively distant from the shore, are suitable for airport but reclamation of these waters are extremely difficult. This paper presents a structural planning of an open sea typemore » middle size floating airport to promote local economy and also improve transportation infrastructure of isolated islands. The airports of this plan are a semisubmersible type floating structure with a relatively thin deck, a number of slender columns and large size lower hulls. The floating structure is moored by inclined tension legs to restrain the motion. The diameter of the leg becomes much larger compared with the legs of existing tension leg platforms. Parameters related to the configuration of the floating structure and the mooring system are determined by comparing analyses results with the proper design criteria. Several kinds of static and dynamic computer programs are used in the planning. The proposed structural plan and the mooring system are considered as a typical floating airport appropriate for the open sea.« less
Nagarur, Amulya; O'Neill, Regina M; Lawton, Donna; Greenwald, Jeffrey L
2018-02-01
The guidance of a mentor can have a tremendous influence on the careers of academic physicians. The lack of mentorship in the relatively young field of hospital medicine has been documented, but the efficacy of formalized mentorship programs has not been well studied. We implemented and evaluated a structured mentorship program for junior faculty at a large academic medical center. Of the 16 mentees who participated in the mentorship program, 14 (88%) completed preintervention surveys and 10 (63%) completed postintervention surveys. After completing the program, there was a statistically significant improvement in overall satisfaction within 5 specific domains: career planning, professional connectedness, self-reflection, research skills, and mentoring skills. All mentees reported that they would recommend that all hospital medicine faculty participate in similar mentorship programs. In this small, single-center pilot study, we found that the addition of a structured mentorship program based on training sessions that focus on best practices in mentoring was feasible and led to increased satisfaction in certain career domains among early-career hospitalists. Larger prospective studies with a longer follow-up are needed to assess the generalizability and durability of our findings. © 2017 Society of Hospital Medicine.
Integrated Structural Analysis and Test Program
NASA Technical Reports Server (NTRS)
Kaufman, Daniel
2005-01-01
An integrated structural-analysis and structure-testing computer program is being developed in order to: Automate repetitive processes in testing and analysis; Accelerate pre-test analysis; Accelerate reporting of tests; Facilitate planning of tests; Improve execution of tests; Create a vibration, acoustics, and shock test database; and Integrate analysis and test data. The software package includes modules pertaining to sinusoidal and random vibration, shock and time replication, acoustics, base-driven modal survey, and mass properties and static/dynamic balance. The program is commanded by use of ActiveX controls. There is minimal need to generate command lines. Analysis or test files are selected by opening a Windows Explorer display. After selecting the desired input file, the program goes to a so-called analysis data process or test data process, depending on the type of input data. The status of the process is given by a Windows status bar, and when processing is complete, the data are reported in graphical, tubular, and matrix form.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
...NMFS publishes regulations to implement Amendment 86 to the Fishery Management Plan for Groundfish of the Bering Sea and Aleutian Islands Management Area and Amendment 76 to the Fishery Management Plan for Groundfish of the Gulf of Alaska (Amendments 86/76). Amendments 86/ 76 add a funding and deployment system for observer coverage to the existing North Pacific Groundfish Observer Program (Observer Program) and amend existing observer coverage requirements for vessels and processing plants. The new funding and deployment system allows NMFS to determine when and where to deploy observers according to management and conservation needs, with funds provided through a system of fees based on the ex-vessel value of groundfish and halibut in fisheries covered by the new system. This action is necessary to resolve data quality and cost equity concerns with the Observer Program's existing funding and deployment structure. This action is intended to promote the goals and objectives of the Magnuson-Stevens Fishery Conservation and Management Act, the Northern Pacific Halibut Act of 1982, the fishery management plans, and other applicable law.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-D program application, plan or plan amendment? 309.35 Section 309.35 Public Welfare Regulations... ENFORCEMENT (IV-D) PROGRAM Tribal IV-D Program Application Procedures § 309.35 What are the procedures for review of a Tribal IV-D program application, plan or plan amendment? (a) The Secretary will promptly...
Quality assurance program requirements, Amendment 5 (9-26-79) to August 1973 issue
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This standard sets forth general requirements for planning, managing, conducting, and evaluating quality assurance programs for reactor development and test facility projects and associated processes, structures, components, and systems. These quality assurance requirements are based on proven practices and provide the means of control and verification whereby those responsible fo poject management can assure that the quality required for safe, reliable, and economical operation will be achieved. The objective of the program of the programs covered by this standard is to assure that structures, components, systems, and facilities are designed, developed, manufactured, constructed, operated, and maintained in compliance with establishedmore » engineering criteria. To achieve this objective, controls are to be established and implemented at predetermined points, and necessary action taken to prevent, detect, and correct any deficiencies.« less
Vision Forward for NASA's Astrophysics Education Program
NASA Astrophysics Data System (ADS)
Hasan, Hashima; Sheth, Kartik J.
2016-01-01
NASA has recently re-structured its Science Education program with the competitive selection of twenty-seven programs. Of these, ~60% are relevant to Astrophysics, and three have primarily Astrophysics content. A brief overview of the rationale for re-structuring will be presented. We have taken a strategic approach, building on our science-discipline based legacy and looking at new approaches given Stakeholder priorities. We plan to achieve our education goals with the selection of organizations that utilize NASA data, products, or processes to meet NASA's education objectives; and by enabling our scientists and engineers with education professionals, tools, and processes to better meet user needs. Highlights of the selected programs will be presented, and how they enable the vision going forward of achieving the goal of enabling NASA scientists and engineers to engage more effectively with learners of all ages.
Curriculum for the Special Education Early Childhood Center.
ERIC Educational Resources Information Center
Taulbee, Dianne R.; And Others
This document presents Jackson County (Michigan) Intermediate School District's Special Education Early Childhood Center's 1988 curriculum. Sections focus on: (1) the center's program; (2) play observation; (3) eligibility; (4) classroom structure and function; (5) the importance of play; (6) developmental milestones; (7) planning and teaching…
10 CFR 1040.72 - Existing facilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Existing facilities. 1040.72 Section 1040.72 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES... three years after the effective date of this subpart. (d) Transition plan. In the event that structural...
10 CFR 1040.72 - Existing facilities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Existing facilities. 1040.72 Section 1040.72 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES... three years after the effective date of this subpart. (d) Transition plan. In the event that structural...
10 CFR 1040.72 - Existing facilities.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Existing facilities. 1040.72 Section 1040.72 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES... three years after the effective date of this subpart. (d) Transition plan. In the event that structural...
10 CFR 1040.72 - Existing facilities.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Existing facilities. 1040.72 Section 1040.72 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS OR ACTIVITIES... three years after the effective date of this subpart. (d) Transition plan. In the event that structural...
Alternative Schools. Research Report 1976-3.
ERIC Educational Resources Information Center
National School Boards Association, Washington, DC.
During the 1970's, school districts throughout the country have created alternative educational programs allowing students and parents to choose the appropriate educational structure and methodology that suit their individual needs. School boards who establish alternative schools must assess, plan, design, effect, and evaluate educational programs…
RECREATION AND SOCIALIZATION FOR THE BRAIN INJURED CHILD.
ERIC Educational Resources Information Center
GOLUB, RISA S.; GORDON, SOL
DESIGNED FOR PARENTS AND SPECIALISTS PLANNING THERAPEUTICALLY ORIENTED RECREATIONAL AND SOCIALIZATION PROGRAMS FOR BRAIN INJURED CHILDREN, THIS DOCUMENT CONTAINS 13 CHAPTERS BY DIFFERENT AUTHORS. ACTIVITIES DISCUSSED ARE GENERALLY NONCOMPETITIVE, EMPHASIZING STRUCTURE AND LIMIT. DISCUSSED ARE (1) THE ROLE OF THE OPTOMETRIST WITH THE INADEQUATE…
Schwartzstein, Richard M; Huang, Grace C; Coughlin, Christine M
2008-06-01
Despite their vital contributions to the training of future physicians, many academic teaching hospitals have grown operationally and financially distinct from affiliated medical schools because of divergent missions, contributing to the erosion of clinical training. Some institutions have responded by building hybrid organizations; others by creating large health care networks with variable relationships with the affiliated medical school. In this case, the authors wished to establish the future educational mission of their medical center as a core element of the institution by creating data-driven recommendations for reorganization, programs, and financing. They conducted a self-study of all constituents, the results of which confirmed the importance of education at their institution but also revealed the insufficiency of incentives for teaching. They underwent an external review by a committee of prominent educators, and they involved administrators at the hospital and the medical school. Together, these inputs composed an informed assessment of medical education at their teaching hospital, from which they developed and actualized an institution-wide strategic plan for education. Over the course of three years, they centralized the administrative structure for education, implemented programs that cross departments and reinforce the UME-GME continuum, and created transparency in the financing of medical education. The plan was purposefully aligned with the clinical and research strategic plans by supporting patient safety in programs and the professional development of faculty. The application of a rigorous strategic planning process to medical education at an academic teaching hospital can focus the mission, invigorate faculty, and lead to innovative programs.
Study findings on evaluation of integrated family planning programme performance.
1980-01-01
In 1976 the United Nations's Economic and Social Commission for Asia and the Pacific launched a comparative study on integrated family planning programs in a number of countries in the region. In November 1979 the study directors from the participating countries meet in Bangkok to discuss the current status of the studies in their countries. The Korean and Malaysian studies were completed, the Bangladesh study was in the data collecting phase, and the Pakistani research design phase was completed. The meeting participants focused their attention on the findings and policy implications of the 2 completed studies and also discussed a number of theorectical and methodological issues which grew out of their research experience. The Malaysian study indicated that group structure, financial resources, and the frequency and quality of worker-client contact were the most significant variables determining program effectiveness. In the Korean Study, leadership, financial resources, and the frequency and quality of contact between agencies were the key variables in determining program effectiveness. In the Malaysian study there was a positive correlation between maternal and child health service performance measures and family planning service performance measures. This finding supported the contention that these 2 types of service provision are not in conflict with each other but instead serve to reinforce each other. Policy implications of the Korean study were 1) family planning should be an integral part of all community activities; 2) family planning workers should be adequately supported by financial and supply allocations; and 3) adequate record keeping and information exchange procedures should be incorporated in the programs.
The CPAT 2.0.2 Domain Model - How CPAT 2.0.2 "Thinks" From an Analyst Perspective.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waddell, Lucas; Muldoon, Frank; Melander, Darryl J.
To help effectively plan the management and modernization of their large and diverse fleets of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) and the Program Executive Office Combat Support and Combat Service Support (PEO CS &CSS) commissioned the development of a large - scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This reportmore » contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets. This report, which is an update to the original CPAT domain model published in 2015 (SAND2015 - 4009), covers important new CPAT features. This page intentionally left blank« less
NASA R and T aerospace plane vehicles: Progress and plans
NASA Technical Reports Server (NTRS)
Dixon, S. C.
1985-01-01
Progress made in key technologies such as materials, structures, aerothermodynamics, hypersonic aerodynamics, and hypersonic airbreathing propulsion are reported. Advances were made in more generic, areas such as active controls, flight computer hardware and software, and interdisciplinary analytical design methodology. These technology advances coupled with the development of and experiences with the Space Shuttle make feasible aerospace plane-type vehicles that meet the more demanding requirements of various DOD missions and/or an all-weather Shuttle II with reduced launch costs. Technology needs and high payoff technologies, and the technology advancements in propulsion, control-configured-vehicles, aerodynamics, aerothermodynamics, aerothermal loads, and materials and structures were studied. The highest payoff technologies of materials and structures including thermal-structural analysis and high temperature test techniques are emphasized. The high priority technology of propulsion, and plans, of what remains to be done rather than firm program commitments, are briefly discussed.
NASA Technical Reports Server (NTRS)
1984-01-01
The work breakdown structure (WBS) for the Space Platform Expendables Resupply Concept Definition Study is described. The WBS consists of a list of WBS elements, a dictionary of element definitions, and an element logic diagram. The list and logic diagram identify the interrelationships of the elements. The dictionary defines the types of work that may be represented by or be classified under each specific element. The Space Platform Expendable Resupply WBS was selected mainly to support the program planning, scheduling, and costing performed in the programmatics task (task 3). The WBS is neither a statement-of-work nor a work authorization document. Rather, it is a framework around which to define requirements, plan effort, assign responsibilities, allocate and control resources, and report progress, expenditures, technical performance, and schedule performance. The WBS element definitions are independent of make-or-buy decisions, organizational structure, and activity locations unless exceptions are specifically stated.
Resident career planning needs in internal medicine: a qualitative assessment.
Garcia, Rina L; Windish, Donna M; Rosenbaum, Julie R
2010-12-01
Few residency programs have centralized resources for career planning. As a consequence, little is known about residents' informational needs regarding career planning. To examine career preparation stressors, practical needs, and information that residents wished they were privy to when applying. In 2007 and 2008, we surveyed 163 recent graduates or graduating residents from 10 Yale-based and Yale-affiliated hospitals' internal medicine programs regarding their experiences with applying for positions after residency. We included questions about demographics, mentorship, stress of finding a job or fellowship, and open-ended questions to assess barriers and frustrations. Qualitative data were coded independently and a classification scheme was negotiated by consensus. A total of 89 residents or recent graduates responded, and 75% of them found career planning during residency training at least somewhat stressful. Themes regarding the application process included (1) knowledge about the process, (2) knowledge about career paths and opportunities, (3) time factors, (4) importance of adequate personal guidance and mentorship, and (5) self-knowledge regarding priorities and the desired outcome. Residents identified the following advice as most important: (1) start the process as early as possible and with a clear knowledge of the process timeline, (2) be clear about personal goals and priorities, and (3) be well-informed about a prospective employer and what that employer is looking for. Most residents felt career planning should be structured into the curriculum and should occur in the first year or throughout residency. This study highlights residents' desire for structured dissemination of information and counseling with regard to career planning during residency. Our data suggest that exposure to such resources may be beneficial as early as the first year of training.
Resident Career Planning Needs in Internal Medicine: A Qualitative Assessment
Garcia, Rina L.; Windish, Donna M.; Rosenbaum, Julie R.
2010-01-01
Background Few residency programs have centralized resources for career planning. As a consequence, little is known about residents' informational needs regarding career planning. Objective To examine career preparation stressors, practical needs, and information that residents wished they were privy to when applying. Methods In 2007 and 2008, we surveyed 163 recent graduates or graduating residents from 10 Yale-based and Yale-affiliated hospitals' internal medicine programs regarding their experiences with applying for positions after residency. We included questions about demographics, mentorship, stress of finding a job or fellowship, and open-ended questions to assess barriers and frustrations. Qualitative data were coded independently and a classification scheme was negotiated by consensus. Results A total of 89 residents or recent graduates responded, and 75% of them found career planning during residency training at least somewhat stressful. Themes regarding the application process included (1) knowledge about the process, (2) knowledge about career paths and opportunities, (3) time factors, (4) importance of adequate personal guidance and mentorship, and (5) self-knowledge regarding priorities and the desired outcome. Residents identified the following advice as most important: (1) start the process as early as possible and with a clear knowledge of the process timeline, (2) be clear about personal goals and priorities, and (3) be well-informed about a prospective employer and what that employer is looking for. Most residents felt career planning should be structured into the curriculum and should occur in the first year or throughout residency. Conclusions This study highlights residents' desire for structured dissemination of information and counseling with regard to career planning during residency. Our data suggest that exposure to such resources may be beneficial as early as the first year of training. PMID:22132271
Program Planning in Health Professions Education
ERIC Educational Resources Information Center
Schmidt, Steven W.; Lawson, Luan
2018-01-01
In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.
Florence, Curtis S; Atherly, Adam; Thorpe, Kenneth E
2006-01-01
Objective To examine the effect of premiums and benefits on the health plan choices of older enrollees who choose Federal Employees Health Benefits Program (FEHBP) health plans as their primary payer. Data Sources Administrative enrollment data from the Office of Personnel Management (OPM) and plan premiums and benefits data taken from the Checkbook Guide to health plans. Study Design We estimate individual plan choice models where the choice of health plan is a function of out-of-pocket premium, actuarial value, plan attributes, and individual characteristics. Plan attributes include plan structure (fee-for-service/preferred provider organization, point-of-service, or health maintenance organization), drug benefit structure, and whether or not the plan covers other types of spending such as dental services and diabetic supplies. The models are estimated by conditional logit. Our study focuses on three populations that currently choose FEHBP as their primary health care coverage and are similar to the Medicare population: current employees and retirees who are approaching the age of Medicare eligibility (ages 60–64) and current federal employees age 65+. Current employees age 65+ are eligible for Medicare, but their FEHBP plan is their primary payer. Retirees and employees 60–64 are not yet eligible for Medicare but are similar in many respects to recently age-eligible Medicare beneficiaries. We also estimate our model for current employees age 55 and younger as a comparison group. Data Collection Methods We select a random sample of retirees and employees age 60–64, as well as all current employees age 65+, from the OPM administrative database for the calendar year 2001. The plan choices available to each person are determined by the plans participating in their metropolitan statistical area. We match plan premium and attribute information from the Checkbook Guide to each plan in the enrollee's list of choices. Principal Findings We find that current workers 65+, 60–64, and non-Medicare eligible retirees are sensitive to variation in plan premiums. The premium elasticities for these groups are similar in magnitude to those of the age 55 and under employee group. Older workers and retirees not yet eligible for Medicare are willing to pay a substantial amount for plans with open provider networks. The willingness to pay for open networks is significantly greater for these groups than for younger employees. Willingness to pay for open network plans varies significantly by income, but varies little by age within group. Conclusions Our finding that older workers and non-Medicare eligible retirees are sensitive to plan premiums suggests that choice-based reform of Medicare would lead to cost-conscious choices by Medicare beneficiaries. However, our finding that these groups are willing to pay more for open network plans than younger employees suggest that higher risk individuals may migrate toward higher benefit, higher cost plans. Our findings on the relationship between income and willingness to pay for open network plans suggest that means testing is a viable reform for lowering Medicare program costs. PMID:16987300
Koekkoek, Bauke; van Meijel, Berno; Schene, Aart; Hutschemaekers, Giel
2010-10-25
Health clinicians perceive certain patients as 'difficult' across all settings, including mental health care. In this area, patients with non-psychotic disorders that become long-term care users may be perceived as obstructing their own recovery or seeking secondary gain. This negative perception of patients results in ineffective responses and low-quality care by health clinicians. Using the concept of illness behaviour, this paper describes the development, implementation, and planned evaluation of a structured intervention aimed at prevention and management of ineffective behaviours by long-term non-psychotic patients and their treating clinicians. The principles of Intervention Mapping were applied to guide the development, implementation, and planned evaluation of the intervention. Qualitative (individual and group interviews), quantitative (survey), and mixed methods (Delphi-procedure) research was used to gain a broad perspective of the problem. Empirical findings, theoretical models, and existing evidence were combined to construct a program tailored to the needs of the target groups. A structured program to increase effective illness behaviour in long-term non-psychotic patients and effective professional behaviour in their treating clinicians was developed, consisting of three subsequent stages and four substantial components, that is described in detail. Implementation took place and evaluation of the intervention is being carried out. Intervention Mapping proved to be a suitable method to develop a structured intervention for a multi-faceted problem in mental health care.
Design of study without drugs--a Surinamese school-based drug-prevention program for adolescents.
Ishaak, Fariel; de Vries, Nanne Karel; van der Wolf, Kees
2015-10-12
The aim of this study was to design the content and accompanying materials for a school-based program--Study without Drugs--for adolescents in junior secondary schools in Suriname based on the starting points and tasks of the fourth step of the Intervention Mapping protocol (which consists of six steps). A program based on this protocol should include a combination of theory, empirical evidence, and qualitative and quantitative research. Two surveys were conducted when designing the program. In Survey I, teachers and students were asked to complete a questionnaire to determine which school year they thought would be most appropriate for implementing a drug-prevention program for adolescents (we completed a similar survey as part of previous research). An attempt was made to identify suitable culturally sensitive elements to include in the program. In Survey II, the same teachers were asked to complete a questionnaire to determine the programs' scope, sequence, structure, and topics as well as the general didactic principles to serve as a basis for program design. After outlining the program plan, lessons, and materials, we conducted a formative pretest evaluation among teachers, students, and parents. That evaluation included measures related to the program's attractiveness, comprehensibility, and usefulness. The resulting lessons were presented to the teachers for assessment. The drug-prevention program we developed comprises 10 activities and lasts 2-2.5 months in an actual school setting. The activities take place during Dutch, biology, physical education, art, religion, and social studies lessons. We based the structure of the lessons in the program on McGuire's Persuasion Communication Model, which takes into account important didactic principles. Evaluations of the program materials and lesson plans by students, teachers, and parents were mostly positive. We believe that using the fourth step of the Intervention Mapping protocol to develop a drug-prevention intervention for adolescents has a produced promising, feasible program.
1985-01-01
The US Agency for International Development (AID) has discontinued its contraceptive social marketing project in Ecuador after 2 1/2 years without a sale. USAID had awarded a 3-year US$1.2 million grant to the program's contractor, the John Snow Public Health Group Inc. The project was run by Ecuador's national family planning association. This is only the 3rd time USAID has terminated a social marketing program since entering this field in 1973. Impediments to the program's operation included product price hikes and supply shortages as a result of teh inflation and currency devaluation in Ecuador in recent years. Government opposition to the sales of donated contraceptive supplies further set back the program. The name chosen for the condom distributed by the program, Liber, had to be changed since a company importing sanitary napkins was using the name Liberty and objected. The program's peculiar organizational structur is also considered to have played a role in the program's failure. Rather than having a single authority responsible for the program, a 2-headed organizational design was used. Program funds were controlled by the contractor, but the family planning organization managed day to day operations. Unified management has enabled programs in other countries to survive problems such as inflation, brand registration, and product and price approvals.
2011-09-30
the project was for “routine maintenance and repair and improvements to non-historic buildings and structures in the Camp Lejeune Complex...and cost overruns; and (5) program goals are achieved, including specific program outcomes and improved results on broader economic indicators. 1...Department of the Navy received approximately $1.2 billion in Recovery Act funds for Operations and Maintenance ; Military Construction; and Research
Repairs to Concrete Port and Harbor Structures
1991-11-18
effective and should plan for their use in maintenance programs. I I DIWRS liNC Solving underwater problems through advanced diving technology 2102 Kelley...calcining limestone-clay mixtures. Smeaton’s invention proved to be the precursory technology leading to the invention of portland cement in 1824...care and with practical technology in order to realize the longevity that is expected of them. Deterioration of concrete port and harbor structures
Sarvet, Barry D; Ravech, Marcy; Straus, John H
2017-10-01
The Massachusetts Child Psychiatry Access Program is a statewide public mental health initiative designed to provide consultation, care navigation, and education to assist pediatric primary care providers in addressing mental health problems for children and families. To improve program performance, adapt to changes in the environment of pediatric primary care services, and ensure the program's long-term sustainability, program leadership in consultation with the Massachusetts Department of Mental Health embarked on a process of redesign. The redesign process is described, moving from an initial strategic assessment of program and the planning of structural and functional changes, through transition and implementation. Copyright © 2017 Elsevier Inc. All rights reserved.
Waddell, Janice; Spalding, Karen; Navarro, Justine; Jancar, Sonya; Canizares, Genevieve
2015-11-28
New graduate nurses' (NGNs) transition into the nursing workforce is characterized as stressful and challenging. Consequently, a high percentage of them leave their first place of employment or the profession entirely within one year of graduation. Nursing literature describes this complicated shift from student to registered nurse, however, limited attention has focused on strategies that could be implemented during students' academic programs to prepare them for this difficult transition period. Therefore, a longitudinal intervention study was conducted to examine the influence of a career planning and development (CPD) program on the development of career resilience in baccalaureate nursing students and at 12 months post-graduation (NGN). The findings support including structured and progressive curriculum-based CPD opportunities in academic programs, not only for the positive outcomes that accrue to students, but also because of the benefits they extend to NGNs as they make the transition to their first professional nursing role.
Díaz Del Castillo, Adriana; Sarmiento, Olga L; Reis, Rodrigo S; Brownson, Ross C
2011-06-01
The growing evidence of the influence of urban environment on physical activity (PA) underscore the need for novel policy solutions to address the inequality, lack of space, and limited PA resources in rapidly growing Latin American cities. This study aims to better understand the PA policy process by conducting two case studies of Bogotá's Ciclovía and Curitiba's CuritibAtiva. Literature review of peer- and non-peer-reviewed documents and semi-structured interviews with stakeholders was conducted. In the cases of Ciclovía and CuritibAtiva, most policies conducive to program development and sustainability were developed outside the health sector in sports and recreation, urban planning, environment, and transportation. Both programs were developed by governments as initiatives to overcome inequalities and provide quality of life. In both programs, multisectoral policies mainly from recreation and urban planning created a window of opportunity for the development and sustainability of the programs and environments supportive of PA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Waddell, Lucas; Muldoon, Frank; Henry, Stephen Michael
In order to effectively plan the management and modernization of their large and diverse fleets of vehicles, Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) commis- sioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thor-more » ough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation. This paper, which is an update to the original CPAT formulation document published in 2015 (SAND2015-3487), covers the formulation of important new CPAT features.« less
ORNL Remedial Action Program strategy (FY 1987-FY 1992)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trabalka, J.R.; Myrick, T.E.
1987-12-01
Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less
Developing a taxonomy for mission architecture definition
NASA Technical Reports Server (NTRS)
Neubek, Deborah J.
1990-01-01
The Lunar and Mars Exploration Program Office (LMEPO) was tasked to define candidate architectures for the Space Exploration Initiative to submit to NASA senior management and an externally constituted Outreach Synthesis Group. A systematic, structured process for developing, characterizing, and describing the alternate mission architectures, and applying this process to future studies was developed. The work was done in two phases: (1) national needs were identified and categorized into objectives achievable by the Space Exploration Initiative; and (2) a program development process was created which both hierarchically and iteratively describes the program planning process.
Advancing LGBT Health at an Academic Medical Center: A Case Study.
Yehia, Baligh R; Calder, Daniel; Flesch, Judd D; Hirsh, Rebecca L; Higginbotham, Eve; Tkacs, Nancy; Crawford, Beverley; Fishman, Neil
2015-12-01
Academic health centers are strategically positioned to impact the health of lesbian, gay, bisexual and transgender (LGBT) populations by advancing science, educating future generations of providers, and delivering integrated care that addresses the unique health needs of the LGBT community. This report describes the early experiences of the Penn Medicine Program for LGBT Health, highlighting the favorable environment that led to its creation, the mission and structure of the Program, strategic planning process used to set priorities and establish collaborations, and the reception and early successes of the Program.
Okeibunor, Joseph; Nsubuga, Peter; Salla, Mbaye; Mihigo, Richard; Mkanda, Pascal
2016-10-10
As part of the efforts to eradicate polioviruses in the African Region, structures were put in place to ensure coordinated mobilization and deployment of resources within the framework of the global polio eradication initiative (PEI). The successes of these structures made them not only attractive to other public health interventions, but also caused them to be deployed to the response efforts of other diseases interventions, without any systematic documentation. This article documents the contributions of PEI coordination units to other public health interventions in the African Region of World Health Organization METHODS: We reviewed the contributions of PEI coordination units to other public health interventions in five countries in the African Region. The analysis identified significant involvement of PEI coordination structures in the implementation of routine immunization programs in all the countries analyzed. Similarly, maternal and child health programs were planned, implemented, monitored and evaluation the Inter-Agency Coordination Committees of the PEI programs in the different countries. The hubs system used in PEI in Chad facilitated the efficient coordination of resources for immunization and other public health interventions in Chad. Similarly, in the Democratic Republic of Congo PEI led coordination activities benefited other public health programs like disease control and the national nutrition program, the national malaria control program, and the tuberculosis control program. In Nigeria, the polio Expert Review Committee effectively deployed the Emergency Operation Center for the implementation of prioritized strategies and activities of the National Polio Eradication Emergency Plan, and it was utilized in the response to Ebola Virus Disease outbreak in the country. The PEI-led coordination systems are thus recognized as having made significant contribution to the coordination and delivery of other public health interventions in the African Region. Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.
20 CFR 632.255 - Program planning.
Code of Federal Regulations, 2010 CFR
2010-04-01
... that may be characterized as planning and design but not program operation. (c) Expenses incurred in... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a...
Lunar Contour Crafting: A Novel Technique for ISRU-Based Habitat Development
NASA Technical Reports Server (NTRS)
Khoshnevis, Behrokh; Bodiford, Melanie P.; Burks, Kevin H.; Ethridge, Ed; Tucker, Dennis; Kim, Won; Toutanji, Houssam; Fiske, Michael R.
2005-01-01
1. Habitat Structures at MSFC is one element of the In-Situ Fabrication and Repair (ISFR) Program: ISFR develops technologies for fabrication, repair and recycling of tools, parts, and habitats/structures using in-situ resources. ISRU - based habitat structures are considered Class III. 2. Habitat Structure Purpose: Develop Lunar and/or Martian habitat structures for manned missions that maximize the use of in-situ resources to address the following agency topics: bioastronautics critical path roadmap; strategic technical challenges defined in H&RT formulation plan: margins and redundancy; modularity, robotic network, space resource utilization; autonomy, affordable logistics pre-positioning.
34 CFR 74.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false Revision of budget and program plans. 74.25 Section 74... Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...
Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH) program
NASA Astrophysics Data System (ADS)
Fayette, Daniel F.; Speicher, Patricia; Stoklosa, Mark J.; Evans, Jillian V.; Evans, John W.; Gentile, Mike; Pagel, Chuck A.; Hakim, Edward
1993-08-01
A joint military-commercial effort to evaluate multichip module (MCM) structures is discussed. The program, Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH), has been designed to identify the failure mechanisms that are possible in MCM structures. The RELTECH test vehicles, technical assessment task, product evaluation plan, reliability modeling task, accelerated and environmental testing, and post-test physical analysis and failure analysis are described. The information obtained through RELTECH can be used to address standardization issues, through development of cost effective qualification and appropriate screening criteria, for inclusion into a commercial specification and the MIL-H-38534 general specification for hybrid microcircuits.
Risk Management Structured for Today's Environment
NASA Technical Reports Server (NTRS)
Greenfield, Michael A.
1998-01-01
In NPG (NASA Procedures and Guidelines) 7120.5A, we define risk management as "an organized, systematic decision-making process that efficiently identifies, analyzes, plans, tracks, controls, and communicates and documents risk in order to increase the likelihood of achieving program/project goals." Effective risk management depends upon a thorough understanding of the concept of risk, the principles of risk management and the formation of a disciplined risk management process. In human spaceflight programs, NASA has always maintained a rigorous and highly structured risk management effort. When lives are at stake, NASA's missions must be 100% safe; the risk management approach used in human spaceflight has always been comprehensive.
Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH) program
NASA Technical Reports Server (NTRS)
Fayette, Daniel F.; Speicher, Patricia; Stoklosa, Mark J.; Evans, Jillian V.; Evans, John W.; Gentile, Mike; Pagel, Chuck A.; Hakim, Edward
1993-01-01
A joint military-commercial effort to evaluate multichip module (MCM) structures is discussed. The program, Reliability Technology to Achieve Insertion of Advanced Packaging (RELTECH), has been designed to identify the failure mechanisms that are possible in MCM structures. The RELTECH test vehicles, technical assessment task, product evaluation plan, reliability modeling task, accelerated and environmental testing, and post-test physical analysis and failure analysis are described. The information obtained through RELTECH can be used to address standardization issues, through development of cost effective qualification and appropriate screening criteria, for inclusion into a commercial specification and the MIL-H-38534 general specification for hybrid microcircuits.
ERIC Educational Resources Information Center
Seeley, Cathy
2004-01-01
This article addresses some important issues in mathematics instruction at the middle and secondary levels, including the structuring of a district's mathematics program; the choice of textbooks and use of calculators in the classroom; the need for more rigorous lesson planning practices; and the dangers of teaching to standardized tests rather…
20 CFR 664.460 - What are work experiences for youth?
Code of Federal Regulations, 2010 CFR
2010-04-01
....460 What are work experiences for youth? (a) Work experiences are planned, structured learning... adjustment, and other transition activities; (7) Entrepreneurship; (8) Service learning; (9) Paid and unpaid... age 18. Local program operators may choose, however, to use this service strategy for eligible youth...
20 CFR 664.460 - What are work experiences for youth?
Code of Federal Regulations, 2011 CFR
2011-04-01
....460 What are work experiences for youth? (a) Work experiences are planned, structured learning... adjustment, and other transition activities; (7) Entrepreneurship; (8) Service learning; (9) Paid and unpaid... age 18. Local program operators may choose, however, to use this service strategy for eligible youth...
75 FR 18219 - Statement of Organization, Functions, and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-09
... programs and resources. Plans, organizes and conducts studies of organizational structures, functional... Americans to remain at home by streamlining access to community-based care and empowering older adults to... American grantees to promote the development of State and Native American-administered, community-based...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tan, J; Shi, F; Hrycushko, B
2015-06-15
Purpose: For tandem and ovoid (T&O) HDR brachytherapy in our clinic, it is required that the planning physicist manually capture ∼10 images during planning, perform a secondary dose calculation and generate a report, combine them into a single PDF document, and upload it to a record- and-verify system to prove to an independent plan checker that the case was planned correctly. Not only does this slow down the already time-consuming clinical workflow, the PDF document also limits the number of parameters that can be checked. To solve these problems, we have developed a web-based automatic quality assurance (QA) program. Methods:more » We set up a QA server accessible through a web- interface. A T&O plan and CT images are exported as DICOMRT files and uploaded to the server. The software checks 13 geometric features, e.g. if the dwell positions are reasonable, and 10 dosimetric features, e.g. secondary dose calculations via TG43 formalism and D2cc to critical structures. A PDF report is automatically generated with errors and potential issues highlighted. It also contains images showing important geometric and dosimetric aspects to prove the plan was created following standard guidelines. Results: The program has been clinically implemented in our clinic. In each of the 58 T&O plans we tested, a 14- page QA report was automatically generated. It took ∼45 sec to export the plan and CT images and ∼30 sec to perform the QA tests and generate the report. In contrast, our manual QA document preparation tooks on average ∼7 minutes under optimal conditions and up to 20 minutes when mistakes were made during the document assembly. Conclusion: We have tested the efficiency and effectiveness of an automated process for treatment plan QA of HDR T&O cases. This software was shown to improve the workflow compared to our conventional manual approach.« less
Responses of Canada's health care management education programs to health care reform initiatives.
Angus, D E; Lay, C M
2000-01-01
Canada's provincial health care systems have been experiencing significant changes, mostly through horizontal integration achieved by merging hospitals, and, in a few cases, through vertical integration of public health, long term care, home care and hospital services. The government motivation for forcing these changes seems to have been primarily financial. In a few cases, the integration seems to have resulted in a stable and successful outcome, but, in most others, there has been destabilization, and in some, there has been chaos. The question posed in this research was how the five accredited Canadian graduate programs in health care management were responding to these changes. Two of the programs have recently made major changes in structure and/or delivery processes, following careful examination of their perceived environments. One has rationalized by subdividing courses. Another is repatriating courses from the business school in order to achieve more health-related content. Four of the five programs have added a number of courses in the last few years, or plan to do so in the next year or two, either because of accreditation criteria or student or faculty interest. The program directors viewed the educational requirements for clinicians and non-clinicians as being identical. In spite of the major structural changes, and the resulting destabilization of the health care organizations (and even governments), none of the programs emphasized the changes as factors in their plans for program changes. They expressed some concern about the possibility of fads as opposed to significant changes. It may be that these changes are dealt with in the content of individual courses. This aspect was not examined by the survey nor by interviews with the directors. Each of the programs has emphasized its own niche, with no consensus about changes required.
Reusable LH2 tank technology demonstration through ground test
NASA Technical Reports Server (NTRS)
Bianca, C.; Greenberg, H. S.; Johnson, S. E.
1995-01-01
The paper presents the project plan to demonstrate, by March 1997, the reusability of an integrated composite LH2 tank structure, cryogenic insulation, and thermal protection system (TPS). The plan includes establishment of design requirements and a comprehensive trade study to select the most suitable Reusable Hydrogen Composite Tank system (RHCTS) within the most suitable of 4 candidate structural configurations. The 4 vehicles are winged body with the capability to deliver 25,000 lbs of payload to a circular 220 nm, 51.6 degree inclined orbit (also 40,000 lbs to a 28.5 inclined 150 nm orbit). A prototype design of the selected RHCTS is established to identify the construction, fabrication, and stress simulation and test requirements necessary in an 8 foot diameter tank structure/insulation/TPS test article. A comprehensive development test program supports the 8 foot test article development and involves the composite tank itself, cryogenic insulation, and integrated tank/insulation/TPS designs. The 8 foot diameter tank will contain the integrated cryogenic insulation and TPS designs resulting from this development and that of the concurrent lightweight durable TPS program. Tank ground testing will include 330 cycles of LH2 filling, pressurization, body loading, depressurization, draining, and entry heating.
Status of DSMT research program
NASA Technical Reports Server (NTRS)
Mcgowan, Paul E.; Javeed, Mehzad; Edighoffer, Harold H.
1991-01-01
The status of the Dynamic Scale Model Technology (DSMT) research program is presented. DSMT is developing scale model technology for large space structures as part of the Control Structure Interaction (CSI) program at NASA Langley Research Center (LaRC). Under DSMT a hybrid-scale structural dynamics model of Space Station Freedom was developed. Space Station Freedom was selected as the focus structure for DSMT since the station represents the first opportunity to obtain flight data on a complex, three-dimensional space structure. Included is an overview of DSMT including the development of the space station scale model and the resulting hardware. Scaling technology was developed for this model to achieve a ground test article which existing test facilities can accommodate while employing realistically scaled hardware. The model was designed and fabricated by the Lockheed Missile and Space Co., and is assembled at LaRc for dynamic testing. Also, results from ground tests and analyses of the various model components are presented along with plans for future subassembly and matted model tests. Finally, utilization of the scale model for enhancing analysis verification of the full-scale space station is also considered.
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less
NASA Technical Reports Server (NTRS)
Connelly, L. C.
1977-01-01
The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.
NASA Astrophysics Data System (ADS)
Kamaruddin, S. M.; Zaini, N. S.; Misni, A.; Ahmad, P.
2018-02-01
Orang Asli possesses a unique relationship with their traditional land. Indigenous people have their thoughts on development, life values, visions, needs, and priorities. The government through Department of Orang Asli Development or Jabatan Kebajikan Orang Asli (JAKOA) implemented various development programs such as structured settlement program, physical improvements such as Regrouping Plan (RPS), Village Restructuring project (PSK), New Village Plan (RKB) and Orang Asli settlement customary Land Survey (village) / Land Acquisition. Orang Asli Community. However, their sense of satisfaction towards the development implemented is rarely evaluated. This paper aims to highlight Orang Asli’s thoughts and level of satisfaction towards the planned housing development of their settlement. A mixed methodology was employed using survey and interview to record their thoughts. The findings suggest that the Orang Asli Community’s sense of satisfaction towards housing development has improved. However, their needs to adhere to their social traditions and norms such as living adjacent to relatives, surrounded by nature within a low-density environment must be respected.
Program planning for the community teaching hospital medical library.
McCorkel, J; Cook, V
1985-01-01
To respond to the increasing demand for information from medical educators and clinicians and to persuade administrators to purchase the newly available microcomputer library systems, medical librarians in community teaching hospitals may find it useful to engage in intermediate term (for example, five-year) program planning. To increase the probability that the plan which emerges will be implemented, the planning process should fit the organizational nexus. Planning involves needs assessment, prioritized program elements, a written plan, and facilities planning (if applicable), which lead to program implementation. Components of a model program plan are presented. PMID:4027443
Harrison, Donald L
2007-01-01
To assess the impact of formal education program participation on the attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning. Cross-sectional study. United States; June 4-July 30, 2004. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Strategic planning formal education program participation. Comprehensiveness of strategic planning. Attitudes and perceptions of owners/managers of independent community pharmacies toward strategic planning. A total of 527 (42.1%) usable questionnaires were returned. Only 124 (23.5%) respondents indicated that they participated in a formal strategic planning education program. However, of the 141 (26.85%) respondents who indicated that they had conducted strategic planning for their community pharmacy, 111 (89.5%) had participated in a formal strategic planning education program. A significant association was detected between formal education program participation and the conducting of strategic planning (P< or =0.0001). Significant differences were observed for all attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning based on program participation (P< or =0.0001). Finally, respondents who indicated that they had participated in a formal education program had a significantly higher comprehensiveness of strategic planning rating than those respondents who did not participate in an educational program (P< or =0.0001). A significant association exists between formal strategic planning education program participation and the conducting of strategic planning by owner/managers of independent community pharmacies, and those participating in such programs have significantly different attitudes and perceptions toward the conducting of strategic planning and have a significantly higher comprehensiveness of strategic planning rating.
Poster - Thur Eve - 54: A software solution for ongoing DVH quality assurance in radiation therapy.
Annis, S-L; Zeng, G; Wu, X; Macpherson, M
2012-07-01
A program has been developed in MATLAB for use in quality assurance of treatment planning of radiation therapy. It analyzes patient DVH files and compiles dose volume data for review, trending, comparison and analysis. Patient DVH files are exported from the Eclipse treatment planning system and saved according to treatment sites and date. Currently analysis is available for 4 treatment sites; Prostate, Prostate Bed, Lung, and Upper GI, with two functions for data report and analysis: patient-specific and organ-specific. The patient-specific function loads one patient DVH file and reports the user-specified dose volume data of organs and targets. These data can be compiled to an external file for a third party analysis. The organ-specific function extracts a requested dose volume of an organ from the DVH files of a patient group and reports the statistics over this population. A graphical user interface is utilized to select clinical sites, function and structures, and input user's requests. We have implemented this program in planning quality assurance at our center. The program has tracked the dosimetric improvement in GU sites after VMAT was implemented clinically. It has generated dose volume statistics for different groups of patients associated with technique or time range. This program allows reporting and statistical analysis of DVH files. It is an efficient tool for the planning quality control in radiation therapy. © 2012 American Association of Physicists in Medicine.
The value of mentoring: a strategic approach to retention and recruitment.
Greene, Maureen T; Puetzer, Mary
2002-10-01
The issues of recruitment, training, and retention of experienced nursing staff remains an ongoing business strategy of nursing service in many health care facilities. The implementation of a structured mentoring program recognizes the need to develop and maintain relationships between the new and the experienced nurses. The terms of mentor and mentee are defined within a structured orientation program, highlighting specific roles and responsibilities of each. The use of other staff as preceptors and resources is discussed as a mechanism to enhance diversity in skill and knowledge development. The value of clinical tracking forms, planning calendars, and feedback mechanisms are stressed to ensure success in monitoring this program in a longitudinal way. Problems associated with the assignment of mentors are addressed as an area for future investigation in different care settings.
Conceptual Design of an In-Space Cryogenic Fluid Management Facility
NASA Technical Reports Server (NTRS)
Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.
1981-01-01
The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is presented. The proposed facility consisting of a supply tank, receiver tank, pressurization system, instrumentation, and supporting hardware, is described. The experimental objectives, the receiver tank to be modeled, and constraints imposed on the design by the space shuttle, Spacelab, and scaling requirements, are described. The conceptual design, including the general configurations, flow schematics, insulation systems, instrumentation requirements, and internal tank configurations for the supply tank and the receiver tank, is described. Thermal, structural, fluid, and safety and reliability aspects of the facility are analyzed. The facility development plan, including schedule and cost estimates for the facility, is presented. A program work breakdown structure and master program schedule for a seven year program are included.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Becker, G.K.
1997-01-01
Bio-Imaging Research Inc. (BIR) and Lockheed Martin Speciality Components (LMSC) are engaged in a Program Research and Development Agreement and a Rapid Commercialization Initiative with the Department of Energy, EM-50. The agreement required BIR and LMSC to develop a data interpretation method that merges nondestructive assay and nondestructive examination (NDA/NDE) data and information sufficient to establish compliance with applicable National TRU Program (Program) waste characterization requirements and associated quality assurance performance criteria. This effort required an objective demonstration of the BIR and LMSC waste characterization systems in their standalone and integrated configurations. The goal of the test plan is tomore » provide a mechanism from which evidence can be derived to substantiate nondestructive assay capability and utility statement for the BIT and LMSC systems. The plan must provide for the acquisition, compilation, and reporting of performance data thereby allowing external independent agencies a basis for an objective evaluation of the standalone BIR and LMSC measurement systems, WIT and APNEA respectively, as well as an expected performance resulting from appropriate integration of the two systems. The evaluation is to be structured such that a statement regarding select INEL RWMC waste forms can be made in terms of compliance with applicable Program requirements and criteria.« less
Adhikari, Surendra B.; Clopton, Tracy M.; Oches, Barry; Jensen, Conrado
2010-01-01
Objectives. We examined the development of a process designed to eliminate tobacco-related disparities in the state of Ohio and described how a cross-cultural work group used a multicomponent community planning process to develop capacity to address such disparities. Methods. The community development model was used as a guide in the planning process. We employed a case study, focus groups, and telephone interviews to assess the process and collect data on tobacco use and awareness. We also employed the appreciative inquiry framework to create the organizational design for the Ohio Cross-Cultural Tobacco Control Alliance (CCTCA), which was formed from the cross-cultural work group and charged with addressing tobacco-related disparities in the state. Results. Data on tobacco use and awareness were collected from 13 underserved populations. At the end of the planning process, the CCTCA was initiated along with structural capacity to serve as a new program incubator highlighting tobacco use and awareness levels in these populations. Conclusions. The CCTCA appeared to be an effective way to begin mobilizing agencies serving underserved populations by providing an operational structure to address tobacco-related disparities. The alliance also successfully implemented culturally competent community-based programs and policies to help eliminate disparities. PMID:20147668
The impact of structural adjustment policies on women's and children's health in Tanzania.
Lugalla, J L
1995-03-01
Since 1981, the government of Tanzania has adopted a variety of policy measures including the National Economic Survival Plan (NESP), Structural Adjustment Program (SAP), Economic Recovery Program (ERP) I, ERP II, Economic and Social Action Plan (ESAP), and Priority Social Action Plan (PSAP) to deal with the country's present social and economic crisis dating back to the late 1970s. The main objective of the these adjustment measures has been to attain macroeconomic balance by bringing national expenditure into line with national income to reduce inflation and to increase exports. Other objectives have been to maintain egalitarian income distribution and the provision of basic social services to the majority of the population. To realize these objectives, the government has been controlling credit and removed subsidies on certain food items and agricultural inputs, introduced a system of progressive devaluation, liberalized trade, and has been trying to reduce government expenditure by introducing cost sharing measures in the education and health sector. The author concludes that the erosion of real incomes and increased poverty have had a devastating effect upon women and children. Rural women have heavier workloads as males migrate to urban areas in search of work, there is increased maternal mortality, and chronic malnutrition and poverty make it difficult to implement HIV/AIDS intervention strategies.
NASA Astrophysics Data System (ADS)
Morita, E.; Weigl, M.; Schuh, A.; Stucki, G.
2006-01-01
Health resort programs have a long tradition, mainly in European countries and Japan. They rely on local resources and the physical environment, physical medicine interventions and traditional medicine to optimise functioning and health. Arguably because of the long tradition, there is only a limited number of high-quality studies that examine the effectiveness of health resort programs. Specific challenges to the evaluation of health resort programs are to randomise the holistic approach with a varying number of specific interventions but also the reliance on the effect of the physical environment. Reference standards for the planning and reporting of health resort studies would be highly beneficial. With the International Classification of Functioning Disability and Health (ICF), we now have such a standard that allows us to describe body functions and structures, activities and participation and interaction with environmental factors. A major challenge when applying the ICF in practice is its length. Therefore, the objective of this project was to identify the ICF categories most relevant for health resort programs. We conducted a consensus-building, three-round, e-mail survey using the Delphi technique. Based on the consensus of the experts, it was possible to come up with an ICF Core Set that can serve as reference standards for the indication, intervention planning and evaluation of health resort programs. This preliminary ICF Core Set should be tested in different regions and in subsets of health resort visitors with varying conditions.
Using the self-select paradigm to delineate the nature of speech motor programming.
Wright, David L; Robin, Don A; Rhee, Jooyhun; Vaculin, Amber; Jacks, Adam; Guenther, Frank H; Fox, Peter T
2009-06-01
The authors examined the involvement of 2 speech motor programming processes identified by S. T. Klapp (1995, 2003) during the articulation of utterances differing in syllable and sequence complexity. According to S. T. Klapp, 1 process, INT, resolves the demands of the programmed unit, whereas a second process, SEQ, oversees the serial order demands of longer sequences. A modified reaction time paradigm was used to assess INT and SEQ demands. Specifically, syllable complexity was dependent on syllable structure, whereas sequence complexity involved either repeated or unique syllabi within an utterance. INT execution was slowed when articulating single syllables in the form CCCV compared to simpler CV syllables. Planning unique syllables within a multisyllabic utterance rather than repetitions of the same syllable slowed INT but not SEQ. The INT speech motor programming process, important for mental syllabary access, is sensitive to changes in both syllable structure and the number of unique syllables in an utterance.
Latest developments in the Advanced Photovoltaic Solar Array Program
NASA Technical Reports Server (NTRS)
Stella, Paul M.; Kurland, Richard M.
1990-01-01
In 1985, the Advanced Photovoltaic Solar Array (APSA) Program was established to demonstrate a producible array system with a specific power greater than 130 W/kg at a 10-kW (BOL) power level. The latest program phase completed fabrication and initial functional testing of a prototype wing representative of a full-scale 5-kW (BOL) wing (except truncated in length to about 1 kW), with weight characteristics that could meet the 130-W/kg (BOL) specific power goal using thin silicon solar cell modules and weight-efficient structural components. The wing configuration and key design details are reviewed, along with results from key component-level and wing-level tests. Projections for future enhancements that may be expected through the use of advanced solar cells and structural components are shown. Performance estimates are given for solar electric propulsion orbital transfer missions through the Van Allen radiation belts. The latest APSA program plans are presented.
An Organizational Diffusion Study on Distance Education
ERIC Educational Resources Information Center
Smith, Lillian Upton; Richter, Donna L.; Miner, Kathleen R.; Watkins, Ken; Usdan, Stuart
2005-01-01
This research explored the diffusion process of distance education in schools of public health to determine best practices in the planning and implementation of future programs. The researcher traced the diffusion process by utilizing a multiple-case study methodology using a semi-structured interview to collect the perceptions of Distance…
New Trends in Specialised Information Policy within the Federal Republic of Germany.
ERIC Educational Resources Information Center
Czermak, M. J.
1986-01-01
Reviews European attitudes toward information policy developments in West Germany, and describes recent activities undertaken by the German private sector, plans to reorganize the Society for Information and Documentation, and the federal government's specialized information program. The policies, structure, and activities of the Scientific and…
A Guide for Perceptual-Motor Training Activities.
ERIC Educational Resources Information Center
South Euclid - Lyndhurst City Schools, Lyndhurst, OH.
This document has been prepared as part of a kindergarten perceptual-training program of the South Euclid-Lyndhurst City School District near Cleveland, Ohio. The guide contains information on training and procedures related to perceptual-motor learning. This information is structured primarily into 150 lesson plans, devised as 30-minute sessions…
Review of Education-Focused Health Impact Assessments Conducted in the United States
ERIC Educational Resources Information Center
Gase, Lauren N.; DeFosset, Amelia R.; Gakh, Maxim; Harris, Celia; Weisman, Susan R.; Dannenberg, Andrew L.
2017-01-01
Background: Health impact assessment (HIA) provides a structured process for examining the potential health impacts of proposed policies, plans, programs, and projects. This study systematically reviewed HIAs conducted in the United States on prekindergarten, primary, and secondary education-focused decisions. Methods: Relevant HIA reports were…
Vegetation and other development options for mitigating urban air pollution impacts
Richard Baldauf; David J. Nowak
2014-01-01
While air pollution control devices and programs are the primary method of reducing emissions, urban air pollution can be further mitigated through planning and design strategies, including vegetation preservation and planting, building design and development, installing roadside and near-source structures, and modifying surrounding terrain features.
Processes and Planning Structure Required for Implementing a Collegewide Area Network.
ERIC Educational Resources Information Center
Lapenta, Susan; Lutz, Todd
Since 1984, Arizona's Mohave Community College (MCC) has implemented innovative educational technology to better serve students, including an instructional television system to serve remote locations and a distance learning program. In 1993, the college initiated a project to upgrade its technological capabilities through the establishment of a…
Pre-Language Activities for the Profoundly Mentally Retarded.
ERIC Educational Resources Information Center
Poole, Marilyn R.; And Others
Provided are sample lesson plans for a program to develop pre-language skills in profoundly retarded children and adults. Characteristic of the suggested activities is the stimulation of all sensory channels through structured infant-like play activities in five general areas: oral stimulation, sensory arousal, motor stimulation, vocal play, and…
Towards Universalization of Primary Education in Asia and the Pacific: Country Studies--Nepal.
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.
The four major chapters of this study describe education in Nepal, analyze the progress of primary education in that country, describe national policy and planning for primary education, and report significant developments and programs. Chapter One concerns the historical background, present structure of education, primary education…
Behavioral Groups as Preventive Care in a Health Maintenance Organization.
ERIC Educational Resources Information Center
Shapiro, Joan; And Others
This paper describes the use of a particular therapeutic modality--behavioral groups--in a relatively new delivery system called a Health Maintenance Organization. The program described, run under the George Washington University Health Plan, offers short-term structured groups designed to aid people at particularly difficult or vulnerable…
18 CFR 801.8 - Flood plain management and protection.
Code of Federal Regulations, 2011 CFR
2011-04-01
... COMMISSION GENERAL POLICIES § 801.8 Flood plain management and protection. (a) Periodic inundation of lands... of flood prone lands with approval of the appropriate signatory party, to safeguard public health... tributaries by encroachment. (2) Plan and promote implementation of projects and programs of a structural and...
Risk-based zoning for urbanizing floodplains.
Porse, Erik
2014-01-01
Urban floodplain development brings economic benefits and enhanced flood risks. Rapidly growing cities must often balance the economic benefits and increased risks of floodplain settlement. Planning can provide multiple flood mitigation and environmental benefits by combining traditional structural measures such as levees, increasingly popular landscape and design features (green infrastructure), and non-structural measures such as zoning. Flexibility in both structural and non-structural options, including zoning procedures, can reduce flood risks. This paper presents a linear programming formulation to assess cost-effective urban floodplain development decisions that consider benefits and costs of development along with expected flood damages. It uses a probabilistic approach to identify combinations of land-use allocations (residential and commercial development, flood channels, distributed runoff management) and zoning regulations (development zones in channel) to maximize benefits. The model is applied to a floodplain planning analysis for an urbanizing region in the Baja Sur peninsula of Mexico. The analysis demonstrates how (1) economic benefits drive floodplain development, (2) flexible zoning can improve economic returns, and (3) cities can use landscapes, enhanced by technology and design, to manage floods. The framework can incorporate additional green infrastructure benefits, and bridges typical disciplinary gaps for planning and engineering.
Neural representations and mechanisms for the performance of simple speech sequences
Bohland, Jason W.; Bullock, Daniel; Guenther, Frank H.
2010-01-01
Speakers plan the phonological content of their utterances prior to their release as speech motor acts. Using a finite alphabet of learned phonemes and a relatively small number of syllable structures, speakers are able to rapidly plan and produce arbitrary syllable sequences that fall within the rules of their language. The class of computational models of sequence planning and performance termed competitive queuing (CQ) models have followed Lashley (1951) in assuming that inherently parallel neural representations underlie serial action, and this idea is increasingly supported by experimental evidence. In this paper we develop a neural model that extends the existing DIVA model of speech production in two complementary ways. The new model includes paired structure and content subsystems (cf. MacNeilage, 1998) that provide parallel representations of a forthcoming speech plan, as well as mechanisms for interfacing these phonological planning representations with learned sensorimotor programs to enable stepping through multi-syllabic speech plans. On the basis of previous reports, the model’s components are hypothesized to be localized to specific cortical and subcortical structures, including the left inferior frontal sulcus, the medial premotor cortex, the basal ganglia and thalamus. The new model, called GODIVA (Gradient Order DIVA), thus fills a void in current speech research by providing formal mechanistic hypotheses about both phonological and phonetic processes that are grounded by neuroanatomy and physiology. This framework also generates predictions that can be tested in future neuroimaging and clinical case studies. PMID:19583476
Musculoskeletal discipline science plan
NASA Technical Reports Server (NTRS)
1991-01-01
Life sciences research in the musculoskeletal discipline must identify possible consequences of weightlessness on this system, understand the mechanisms of these effects, and develop effective and operationally practical countermeasures to protect crewmembers. The musculoskeletal system is highly plastic in that is possesses the inherent capability to adapt its structural and functional properties in accordance with the type and degree of stimuli imposed on it. Prolonged space travel is essentially a period of significant unloading of the musculoskeletal system. This results in adaptive responses in the structure and function of this system, placing it on the low end of a continuum from one of complete disuse to one of maximal use. There is a high probability that the musculoskeletal system is functionally impaired with increasing duration of weightlessness. The purpose of this Discipline Science Plan is to provide a conceptual strategy for NASA's Life Sciences division research and development activities in the area of musculoskeletal function. This document summarizes the current status of the program, outlines available knowledge, establishes goals and objectives, identifies science priorities, and defines research opportunities, which encompass critical questions in the subdiscipline areas (e.g., muscle, bone, and other musculoskeletal connective tissues). These science activities include ground-based and flight; basic, applied, and operational; and animal and human research and development. This document contains a general plan that will be used by both NASA Headquarters Program Offices and the field centers to review and plan basic, applied, and operational intramural and extramural research and development activities in this area.
The PANDA physics program: Strangeness and more
DOE Office of Scientific and Technical Information (OSTI.GOV)
Iazzi, Felice, E-mail: felice.iazzi@polito.it; Politecnico di Torino, Turin; Collaboration: PANDA Collaboration
2016-06-21
The physics program of the PANDA experiment at FAIR is illustrated, with a particular attention to the planned activity in the field of the doubly strange systems. The investigation of these systems can help, among others, to shed light on the role of the hyperons in the composition of the neutron stars. The great advantages that can be reached in the field of the charmed systems and nucleon structure by using high quality and intense antiproton beams are also recalled.
ERIC Educational Resources Information Center
Gurbuz, Fatih
2015-01-01
The purpose of this study is to determine the views of the pre-service teachers who received training on pedagogical formation certificate program about micro-teaching method. The study was carried out with a case study method. Semi-structured interviews were used in the study as a data collection tool to gather pre-service teachers' views about…
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less
Implementing corporate wellness programs: a business approach to program planning.
Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L
1995-11-01
1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.
Bridging the Chasm: A Comparison of the Army’s 1997 and 2012 Doctrinal Planning Processes
2014-12-04
little research on this topic, this monograph includes several structured interviews with Mission Command Training Program (MCTP) observer- controllers...with ADRP 5-0 (2012) terminology. Second, the author reversed the order of Shoffner’s (b) and (c) to demonstrate the structure of the supplemental...of adaptability supplements this by saying, “Army leaders accept that no prefabricated solutions to tactical or operational problems exist. Army
14 CFR 1260.125 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Revision of budget and program plans. 1260....125 Revision of budget and program plans. (a) The budget plan is the financial expression of the... required to report deviations from budget and program plans, and request prior approvals for budget and...
The implementation of the integrated design process in the hole-plan system
NASA Astrophysics Data System (ADS)
Ruy, Won-Sun; Ko, Dae-Eun; Yang, Young-Soon
2012-12-01
All current shipyards are using the customized CAD/CAM programs in order to improve the design quality and increase the design efficiency. Even though the data structures for ship design and construction are almost completed, the implementation related to the ship design processes are still in progress so that it has been the main causes of the bottleneck and delay during the middle of design process. In this study, we thought that the hole-plan system would be a good example which is remained to be improved. The people of outfitting division who don't have direct authority to edit the structural panels, should request the hull design division to install the holes for the outfitting equipment. For acceptance, they should calculate the hole position, determine the hole type, and find the intersected contour of panel. After consideration of the hull people, the requested holes are manually installed on the hull structure. As the above, many processes are needed such as communication and discussion between the divisions, drawings for hole-plan, and the consideration for the structural or production compatibility. However this iterative process takes a lot of working time and requires mental pressure to the related people and cross-division conflict. This paper will handle the hole-plan system in detail to automate the series of process and minimize the human efforts and time-consumption.
NASA airframe structural integrity program
NASA Technical Reports Server (NTRS)
Harris, Charles E.
1991-01-01
NASA has initiated a research program with the long-term objective of supporting the aerospace industry in addressing issues related to the aging commercial transport fleet. The interdisciplinary program combines advanced fatigue crack growth prediction methodology with innovative nondestructive examination technology with the focus on multi-site damage (MSD) at riveted connections. A fracture mechanics evaluation of the concept of pressure proof testing the fuselage to screen for MSD has been completed. Also, a successful laboratory demonstration of the ability of the thermal flux method to detect disbonds at riveted lap splice joints has been conducted. All long-term program elements have been initiated and the plans for the methodology verification program are being coordinated with the airframe manufacturers.
NASA airframe structural integrity program
NASA Technical Reports Server (NTRS)
Harris, Charles E.
1990-01-01
NASA initiated a research program with the long-term objective of supporting the aerospace industry in addressing issues related to the aging of the commercial transport fleet. The program combines advanced fatigue crack growth prediction methodology with innovative nondestructive examination technology with the focus on multi-stage damage (MSD) at rivited connections. A fracture mechanics evaluation of the concept of pressure proof testing the fuselage to screen for MSD was completed. A successful laboratory demonstration of the ability of the thermal flux method to detect disbonds at rivited lap splice joints was conducted. All long-term program elements were initiated, and the plans for the methodology verification program are being coordinated with the airframe manufacturers.
Solar System Exploration Division Strategic Plan, volume 1. Executive summary and overview
NASA Technical Reports Server (NTRS)
1991-01-01
This first document is the first of a six-volume series presenting the Solar System Exploration Division's Strategic Plan for the 10-year period FY 1994 to FY 2003. The overall strategy is characterized by five fundamental precepts: (1) execute the current program; (2) improve the vitality of the program and the planetary science community; (3) initiate innovative, small, low-cost planetary missions; (4) initiate new major and moderate missions; and (5) prepare for the next generation of missions. This Strategic Plan describes in detail our proposed approach to accomplish these goals. Volume 1 provides first an Executive Summary of highlights of each of the six volumes, and then goes on to present an overview of the plan, including a discussion of the planning context and strategic approach. Volumes 2, 3, 4, and 5 describe in detail the initiatives proposed. An integral part of each of these volumes is a set of responses to the mission selection criteria questions developed by the Space and Earth Science Advisory Committee. Volume 2, Mission From Planet Earth, describes a strategy for exploring the Moon and Mars and sets forth proposed moderate missions--Lunar Observer and a Mars lander network. Volume 3, Pluto Flyby/Neptune Orbiter, discusses our proposed major new start candidate for the FY 1994 to FY 1998 time frame. Volume 4, Discovery, describes the Near-Earth Asteroid Rendezvous, as well as other candidates for this program of low-cost planetary missions. Volume 5, Toward Other Planetary Systems, describes a major research and analysis augmentation that focuses on extrasolar planet detection and the study of planetary system processes. Finally, Volume 6 summarizes the technology program that the division has structured around these four initiatives.
Computerized fracture critical and specialized bridge inspection program with NDE applications
NASA Astrophysics Data System (ADS)
Fish, Philip E.
1998-03-01
Wisconsin Department of Transportation implemented a Fracture Critical & Specialized Inspection Program in 1987. The program has a strong emphasis on Nondestructive Testing (NDT). The program is also completely computerized, using laptop computers to gather field data, digital cameras for pictures, and testing equipment with download features. Final inspection reports with detailed information can be delivered within days of the inspection. The program requires an experienced inspection team and qualified personnel. Individuals performing testing must be licensed ASNT (American Society for Nondestructive Testing) Level III and must be licensed Certified Weld Inspectors (American Welding Society). Several critical steps have been developed to assure that each inspection identifies all possible deficiencies that may be possible on a Fracture Critical or Unique Bridge. They include; review of all existing plans and maintenance history; identification of fracture critical members, identification of critical connection details, welds, & fatigue prone details, development of visual and NDE inspection plan; field inspection procedures; and a detailed formal report. The program has found several bridges with critical fatigue conditions which have resulted in replacement or major rehabilitation. In addition, remote monitoring systems have been installed on structures with serious cracking to monitor for changing conditions.
49 CFR 613.200 - Statewide transportation planning and programming.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...
49 CFR 613.200 - Statewide transportation planning and programming.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...
49 CFR 613.200 - Statewide transportation planning and programming.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...
49 CFR 613.200 - Statewide transportation planning and programming.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...
49 CFR 613.200 - Statewide transportation planning and programming.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...
Radiation Planning Assistant - A Streamlined, Fully Automated Radiotherapy Treatment Planning System
Court, Laurence E.; Kisling, Kelly; McCarroll, Rachel; Zhang, Lifei; Yang, Jinzhong; Simonds, Hannah; du Toit, Monique; Trauernicht, Chris; Burger, Hester; Parkes, Jeannette; Mejia, Mike; Bojador, Maureen; Balter, Peter; Branco, Daniela; Steinmann, Angela; Baltz, Garrett; Gay, Skylar; Anderson, Brian; Cardenas, Carlos; Jhingran, Anuja; Shaitelman, Simona; Bogler, Oliver; Schmeller, Kathleen; Followill, David; Howell, Rebecca; Nelson, Christopher; Peterson, Christine; Beadle, Beth
2018-01-01
The Radiation Planning Assistant (RPA) is a system developed for the fully automated creation of radiotherapy treatment plans, including volume-modulated arc therapy (VMAT) plans for patients with head/neck cancer and 4-field box plans for patients with cervical cancer. It is a combination of specially developed in-house software that uses an application programming interface to communicate with a commercial radiotherapy treatment planning system. It also interfaces with a commercial secondary dose verification software. The necessary inputs to the system are a Treatment Plan Order, approved by the radiation oncologist, and a simulation computed tomography (CT) image, approved by the radiographer. The RPA then generates a complete radiotherapy treatment plan. For the cervical cancer treatment plans, no additional user intervention is necessary until the plan is complete. For head/neck treatment plans, after the normal tissue and some of the target structures are automatically delineated on the CT image, the radiation oncologist must review the contours, making edits if necessary. They also delineate the gross tumor volume. The RPA then completes the treatment planning process, creating a VMAT plan. Finally, the completed plan must be reviewed by qualified clinical staff. PMID:29708544
24 CFR 84.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Revision of budget and program... and Program Management § 84.25 Revision of budget and program plans. (a) The budget plan is the... required to report deviations from budget and program plans, and request prior approvals for budget and...
NASA Technical Reports Server (NTRS)
Sakata, I. F.; Ostrom, R. B.; Cardinale, S. V.
1978-01-01
The effort required by commercial transport manufacturers to accomplish the transition from current construction materials and practices to extensive use of composites in aircraft wings was investigated. The engineering and manufacturing disciplines which normally participate in the design, development, and production of an aircraft were employed to ensure that all of the factors that would enter a decision to commit to production of a composite wing structure were addressed. A conceptual design of an advanced technology reduced energy aircraft provided the framework for identifying and investigating unique design aspects. A plan development effort defined the essential technology needs and formulated approaches for effecting the required wing development. The wing development program plans, resource needs, and recommendations are summarized.
ERIC Educational Resources Information Center
Bhola, H. S.
Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…
43 CFR 12.925 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Revision of budget and program plans. 12... Organizations Post-Award Requirements § 12.925 Revision of budget and program plans. (a) The budget plan is the...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...
Saudi Arabia's experience in solar energy applications
NASA Astrophysics Data System (ADS)
Huraib, Fahad S.
The progress in solar energy research in Saudi Arabia is discussed with emphasis on the efforts of a government research entity - King Adbulaziz City for Science and Technology (KACST). Three programs currently underway at KACST are considered: the continuation of activities initiated under the Solar Energy Research American/Saudi (SOLERAS) program, a Saudi/German program, and projects developed and conducted completely by KACST. The objectives, management structure, and program organization of SOLEARS are outlined, and attention is focused on urban, rural/agricultural, and industrial applications as well as resource development activities and accomplishments. Solar-hydrogen projects pursued together with Germany are reviewed, and their objectives, program management, and technical plans are covered. Domestic programs dealing with photovoltaic-powered lightning and hot-water systems are summarized.
Waste certification program plan for Oak Ridge National Laboratory. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Orrin, R.C.
1997-05-01
This document defines the waste certification program developed for implementation at Oak Ridge National Laboratory (ORNL). The document describes the program structure, logic, and methodology for certification of ORNL wastes. The purpose of the waste certification program is to provide assurance that wastes are properly characterized and that the Waste Acceptance Criteria (WAC) for receiving facilities are met. The program meets the waste certification requirements outlined in US Department of Energy (DOE) Order 5820.2A, Radioactive Waste Management, and ensures that 40 CFR documentation requirements for waste characterization are met for mixed (both radioactive and hazardous) and hazardous (including polychlorinated biphenyls)more » waste. Program activities will be conducted according to ORNL Level 1 document requirements.« less
Life sciences flight experiments program - Overview
NASA Technical Reports Server (NTRS)
Berry, W. E.; Dant, C. C.
1981-01-01
The considered LSFE program focuses on Spacelab life sciences missions planned for the 1984-1985 time frame. Life Sciences Spacelab payloads, launched at approximately 18-months intervals, will enable scientists to test hypotheses from such disciplines as vestibular physiology, developmental biology, biochemistry, cell biology, plant physiology, and a variety of other life sciences. An overview is presented of the LSFE program that will take advantage of the unique opportunities for biological experimentation possible on Spacelab. Program structure, schedules, and status are considered along with questions of program selection, and the science investigator working groups. A description is presented of the life sciences laboratory equipment program, taking into account the general purpose work station, the research animal holding facility, and the plant growth unit.
Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability
Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.
2014-01-01
Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644
Code of Federal Regulations, 2014 CFR
2014-10-01
...) The effective date of a plan or plan amendment may not be earlier than the first day of the fiscal... program application, plan or plan amendment? 309.35 Section 309.35 Public Welfare Regulations Relating to... of a Tribal IV-D program application, plan or plan amendment? (a) The Secretary will promptly review...
Value rules: senior management incentives in the post-option era.
Ericson, Richard
2004-01-01
Big changes are in the news and on boardroom agendas. This is a good time for many companies to step back and think fundamentally about how senior management incentives are structured and how these programs should be redesigned for better business results. This article describes the main problems with current incentive structures. It then shows how "value rules" can help employers make better use of incentive plans and create a real stake in business units' long-term results, so that the overall structure of executive incentives consistently encourages value creation for shareholders.
NASA Astrophysics Data System (ADS)
Zuloaga, P.; Ordoñez, M.; Andrade, C.; Castellote, M.
2011-04-01
The generic design of the centralised spent fuel storage facility was approved by the Spanish Safety Authority in 2006. The planned operational life is 60 years, while the design service life is 100 years. Durability studies and surveillance of the behaviour have been considered from the initial design steps, taking into account the accessibility limitations and temperatures involved. The paper presents an overview of the ageing management program set in support of the Performance Assessment and Safety Review of El Cabril low and intermediate level waste (LILW) disposal facility. Based on the experience gained for LILW, ENRESA has developed a preliminary definition of the Ageing Management Plan for the Centralised Interim Storage Facility of spent Fuel and High Level Waste (HLW), which addresses the behaviour of spent fuel, its retrievability, the confinement system and the reinforced concrete structure. It includes tests plans and surveillance design considerations, based on the El Cabril LILW disposal facility.
Texas hospital chief executive officers evaluate content areas in health administration education.
Harkins, L T; Herkimer, A G
1995-01-01
Health care executives are confronted by a working environment that is increasingly difficult to manage. Skyrocketing health care costs, with shrinking reimbursement, threaten the existence of hospitals. A successful hospital chief executive officer (CEO) is one who can effectively manage his/her hospital in spite of industry challenges and problems. Graduate programs in health services administration must be designed to meet the needs of future health care executives. Many times, educators are criticized for not addressing "real world" issues within the curricular structure. The present study was conducted to gather information from executives who are the experts on what to expect in the health care industry regarding the appropriateness of curricular topics. Results indicate that practicing CEOs believe those curricular areas which focus on financial planning, budgeting, medical-legal issues, and strategic planning are more important than those that deal with international health care, epidemiology, or research methods. The information gathered in this study may be useful as a guide for educators, to evaluate and revise existing graduate programs in health care administration. Data presented here may also be used to assist in long-range planning for new health administration programs.
NASA Technical Reports Server (NTRS)
Agnew, Donald L.; Jones, Peter A.
1989-01-01
A study was conducted to define reasonable and representative LDR system concepts for the purpose of defining a technology development program aimed at providing the requisite technological capability necessary to start LDR development by the end of 1991. This volume presents thirteen technology assessments and technology development plans, as well as an overview and summary of the LDR concepts. Twenty-two proposed augmentation projects are described (selected from more than 30 candidates). The five LDR technology areas most in need of supplementary support are: cryogenic cooling; astronaut assembly of the optically precise LDR in space; active segmented primary mirror; dynamic structural control; and primary mirror contamination control. Three broad, time-phased, five-year programs were synthesized from the 22 projects, scheduled, and funding requirements estimated.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less
Planning for robust reserve networks using uncertainty analysis
Moilanen, A.; Runge, M.C.; Elith, Jane; Tyre, A.; Carmel, Y.; Fegraus, E.; Wintle, B.A.; Burgman, M.; Ben-Haim, Y.
2006-01-01
Planning land-use for biodiversity conservation frequently involves computer-assisted reserve selection algorithms. Typically such algorithms operate on matrices of species presence?absence in sites, or on species-specific distributions of model predicted probabilities of occurrence in grid cells. There are practically always errors in input data?erroneous species presence?absence data, structural and parametric uncertainty in predictive habitat models, and lack of correspondence between temporal presence and long-run persistence. Despite these uncertainties, typical reserve selection methods proceed as if there is no uncertainty in the data or models. Having two conservation options of apparently equal biological value, one would prefer the option whose value is relatively insensitive to errors in planning inputs. In this work we show how uncertainty analysis for reserve planning can be implemented within a framework of information-gap decision theory, generating reserve designs that are robust to uncertainty. Consideration of uncertainty involves modifications to the typical objective functions used in reserve selection. Search for robust-optimal reserve structures can still be implemented via typical reserve selection optimization techniques, including stepwise heuristics, integer-programming and stochastic global search.
Martinez-Brockman, J L; Shebl, F M; Harari, N; Pérez-Escamilla, R
2017-06-01
In the United States rates of exclusive breastfeeding duration remain exceedingly low. Exclusive breastfeeding is a complex learned behavior that is influenced by social cognitive, interpersonal, and structural factors. Interventions are needed that address factors at multiple levels of the social-ecological model. This study was designed to examine the social cognitive predictors of exclusive breastfeeding behavior in a sample of low-income women attending the Special Supplemental Nutrition Program for Women, Infants, and Children (WIC) breastfeeding peer counseling program and enrolled in the Lactation Advice Through Texting Can Help (LATCH) study. The objectives were to examine whether: (1) the theoretical model, the Health Action Process Approach (HAPA), fit the data well; (2) planning mediated the effect of intentions and maintenance self-efficacy on exclusive breastfeeding; and (3) recovery self-efficacy mediated the association between maintenance self-efficacy and exclusive breastfeeding behavior. Outcome expectancies, action self-efficacy and intentions were assessed prenatally at baseline in N = 119 participants. Maintenance self-efficacy, planning, recovery self-efficacy and breastfeeding behavior were measured at two weeks post partum. Structural equation modeling with mean and variance adjusted Weighted Least Squares estimation was used to examine the applicability of the HAPA model to the data. Phase specific self-efficacy and planning significantly predicted exclusive breastfeeding status. Planning and recovery self-efficacy mediated the association between maintenance self-efficacy and exclusive breastfeeding. Planning did not emerge as a mediator between intentions and behavior. These results demonstrate the utility of the HAPA model in predicting exclusive breastfeeding behavior among low-income women attending WIC. LATCH is a theoretically sound text messaging intervention that can be used to augment and reinforce the WIC breastfeeding peer counseling process. Copyright © 2017 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Martin, Mark A.
2002-04-16
Vegetation Management along the Rocky Reach – Maple Valley No. 1 Transmission Line ROW from structure 98/2 to structure 110/1. The transmission line is a 500 kV line. BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and around structure landings for the purpose of maintaining access to structures site. All work will be in accordance with the National Electrical Safety Code and BPA standards.
20 CFR 632.255 - Program planning.
Code of Federal Regulations, 2011 CFR
2011-04-01
... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a)(1) In developing the summer program, the Native American grantee shall coordinate the summer plan..., except that 45 days prior to the beginning of the summer program and 45 days after the summer program...
20 CFR 632.255 - Program planning.
Code of Federal Regulations, 2012 CFR
2012-04-01
... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a)(1) In developing the summer program, the Native American grantee shall coordinate the summer plan..., except that 45 days prior to the beginning of the summer program and 45 days after the summer program...
Logistics planning for phased programs.
NASA Technical Reports Server (NTRS)
Cook, W. H.
1973-01-01
It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.
Implementation strategy for achieving replacement level fertility.
1993-01-01
The recommendation of the Bali Declaration on Population and Sustainable Development at the ESCAP regional conference was to adopt strategies for attaining replacement-level fertility of 2.1 or 2.2 children by 2010. East Asian countries, except Mongolia and the Democratic People's Republic of Korea, and the Southeast Asian countries Singapore and Thailand have already reached replacement-level fertility. Most larger Oceanic countries have also done so. Only South Asian Sri Lanka and southern India have attained replacement level. The following conditions slow or hinder the goal, but they do not provide an "absolute" barrier to fertility decline: social welfare schemes and old age security, son preference, lack of government family planning, poverty, relatively high mortality, low status of women, and education status. Theories of demographic transition have postulated that economic and social development initially brings a decline in mortality, and later brings a decline in fertility; and high fertility was an adaptation to high mortality. Policy gets caught in the lag between mortality and fertility decline. Eventually the cultural motives for high fertility are undercut by social and economic development. Although the generalization that economic growth slows fertility is true for South Asia, the correlation is uneven. Forceful government-sponsored family planning programs in Bangladesh and China may lead the way to strategies for decline in ESCAP region. A Thailand study suggested important factors were fundamental social change, the increased cost of children, cultural acceptance of birth control, a latent demand for fertility control, and government efforts in family planning. ESCAP countries have in common relatively high morality and inadequate public health programs, patriarchal structures, and limited female autonomy, poverty and landlessness, lack of community cohesiveness, and inadequate family planning programs. Weaknesses in programs are attributed to failure to recognize policies that affect reproduction and the difference between male power and female responsibility. Direct strategies should involve strong government support for male and female contraception, government promotion of delayed marriage, and an emphasis on reproductive health in female family planning programs.
Evaluation of the ESRD Managed Care Demonstration Operations
Oppenheimer, Caitlin Carroll; Shapiro, Jennifer R.; Beronja, Nancy; Dykstra, Dawn M.; Gaylin, Daniel S.; Held, Philip J.; Rubin, Robert J.
2003-01-01
Individuals with end stage renal disease (ESRD), most of whom are insured by Medicare, are generally prohibited from enrolling in Medicare managed care plans (MCPs). CMS offered ESRD patients the opportunity to participate in an ESRD managed care demonstration mandated by Congress. The demonstration tested whether managed care systems would be of interest to ESRD patients and whether these approaches would be operationally feasible and efficient for treating ESRD patients. This article examines the structure, implementation, and operational outcomes of the three demonstration sites, focusing on: the structure of these managed care programs for ESRD patients, requirements needed to attract and enroll patients, and the challenges of introducing managed care programs in the ESRD arena. PMID:14628397
Interactive Management and Updating of Spatial Data Bases
NASA Technical Reports Server (NTRS)
French, P.; Taylor, M.
1982-01-01
The decision making process, whether for power plant siting, load forecasting or energy resource planning, invariably involves a blend of analytical methods and judgement. Management decisions can be improved by the implementation of techniques which permit an increased comprehension of results from analytical models. Even where analytical procedures are not required, decisions can be aided by improving the methods used to examine spatially and temporally variant data. How the use of computer aided planning (CAP) programs and the selection of a predominant data structure, can improve the decision making process is discussed.
Navy DDG-1000 (DD(X)) and CG(X) Programs: Background and Issues for Congress
2006-06-20
Report RL32665, Navy Force Structure and Shipbuilding Plans : Background and Issues for Congress, by Ronald O’Rourke. The Navy wants to procure a total of 7...DDG-1000s and 19 CG(X)s as part of a proposed 313-ship fleet.2 Under the Navy’s proposed plan , the first two DDG-1000s are to be procured in FY2007...major DDG-1000 contractors, including Northrop Grumman’s Ship Systems ( NGSS ) division (which includes the Ingalls Shipyard in Pascagoula, MS), General
Project MOVE Program Planning Kit.
ERIC Educational Resources Information Center
Farris, Charlotte J.
This program planning kit contains information and activities on evaluation, change, leadership, and sex stereotyping which provided the basis for planning Project MOVE (Maximizing Options in Vocational Education) programs but which can be generalized and adapted for use in planning other programs. Assumptions ano guidelines based upon theory and…
Cockpit Resource Management (CRM) training in the 1550th combat crew training wing
NASA Technical Reports Server (NTRS)
Fiedler, Michael T.
1987-01-01
The training program the 1550th Combat Crew Training Wing at Kirtland Air Force Base, New Mexico, implemented in September 1985 is discussed. The program is called Aircrew Coordination Training (ACT), and it is designed specifically to help aircrew members work more effectively as a team in their respective aircraft and hopefully to reduce human factors-related accidents. The scope of the 1550th CCTW's training responsibilities is described, the structure of the program, along with a brief look at the content of the academic part of the course. Then the Mission-Oriented Simulator Training (MOST) program is discussed; a program similar to the Line Oriented Flight Training (LOFT) programs. Finally, the future plans for the Aircrew Coordination Training Program at the 1550th is discussed.
International practice experiences in pharmacy education.
Cisneros, Robert M; Jawaid, Sarah Parnapy; Kendall, Debra A; McPherson, Charles E; Mu, Keli; Weston, Grady Scott; Roberts, Kenneth B
2013-11-12
To identify reasons for inclusion of international practice experiences in pharmacy curricula and to understand the related structure, benefits, and challenges related to the programs. A convenience sample of 20 colleges and schools of pharmacy in the United States with international pharmacy education programs was used. Telephone interviews were conducted by 2 study investigators. University values and strategic planning were among key driving forces in the development of programs. Global awareness and cultural competency requirements added impetus to program development. Participants' advice for creating an international practice experience program included an emphasis on the value of working with university health professions programs and established travel programs. Despite challenges, colleges and schools of pharmacy value the importance of international pharmacy education for pharmacy students as it increases global awareness of health needs and cultural competencies.
Valente, Thomas W; Chou, Chich Ping; Pentz, Mary Ann
2007-05-01
We examined the effect of community coalition network structure on the effectiveness of an intervention designed to accelerate the adoption of evidence-based substance abuse prevention programs. At baseline, 24 cities were matched and randomly assigned to 3 conditions (control, satellite TV training, and training plus technical assistance). We surveyed 415 community leaders at baseline and 406 at 18-month follow-up about their attitudes and practices toward substance abuse prevention programs. Network structure was measured by asking leaders whom in their coalition they turned to for advice about prevention programs. The outcome was a scale with 4 subscales: coalition function, planning, achievement of benchmarks, and progress in prevention activities. We used multiple linear regression and path analysis to test hypotheses. Intervention had a significant effect on decreasing the density of coalition networks. The change in density subsequently increased adoption of evidence-based practices. Optimal community network structures for the adoption of public health programs are unknown, but it should not be assumed that increasing network density or centralization are appropriate goals. Lower-density networks may be more efficient for organizing evidence-based prevention programs in communities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, whichmore » is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included.« less
Thomas, M M; Hodge, W; Smith, B J
2009-12-01
Integrated planning is a holistic approach to addressing the needs of local communities built on partnerships between those responsible for development, environmental quality and service provision. This study investigated the extent and key influences on the use of integrated planning to promote physical activity among six metropolitan councils in Melbourne Australia, which took part in the MetroACTIVE Project funded by the Victorian Health Promotion Foundation from 2005 to 2007. The evaluation entailed interviews conducted at the mid-term (N = 67) and completion (N = 50) of the project, and the review of relevant documents. Respondents included elected councillors, chief executive officers, officers from different council divisions and the project staff employed in each council. Three councils showed evidence of integrated planning for physical activity, whereas the remainder focused on the delivery of community participation programs. Leadership from senior management and an organizational culture that supported collaboration across council departments were prerequisites for integrated planning. Employment of a dedicated project officer with skills for engaging management and building partnerships within the organization was important. Barriers to integrated planning were a complex organization structure, high demands on the council due to a growing residential population and a poor climate among staff. Overall, integrated planning was found to be a viable approach for developing a coordinated approach to this issue involving the range of council services and functions. Ongoing strategies are needed to facilitate senior management commitment and organizational capacity for integrated planning, with leadership provided by departments responsible for infrastructure or corporate planning.
Zakrison, Tanya L; Polk, Travis M; Dixon, Rachel; Ekeh, Akpofure P; Gross, Kirby R; Davis, Kimberly A; Kurek, Stanley J; Stassen, Nicole A; Patel, Mayur B
2017-07-01
Mentorship programs in surgery are used to overcome barriers to clinical and academic productivity, research success, and work-life balance. We sought to determine if the Eastern Association for the Surgery of Trauma (EAST) Mentoring Program has met its goals of fostering academic and personal growth in young acute care surgeons. We conducted a systematic program evaluation of EAST Mentoring Program's first 4 years. Demographic information was collected from EAST records, mentorship program applications, and mentee-mentor career development plans. We reviewed the career development plans for thematic commonalities and results of a structured, online questionnaire distributed since program inception. A mixed methods approach was used to better understand the program goals from both mentee and mentor perspectives, as well as attitudes and barriers regarding the perceived success of this career development program. During 2012 to 2015, 65 mentoring dyads were paired and 60 completed the program. Of 184 surveys distributed, 108 were returned (57% response rate). Respondents were evenly distributed between mentees and mentors (53 vs. 55, p = 0.768). In participant surveys, mentoring relationships were viewed to focus on research (45%), "sticky situations" (e.g., communication, work-life balance) (27%), education (18%), or administrative issues (10%). Mentees were more focused on research and education versus mentors (74% vs. 50%; p = 0.040). Mentees felt that goals were "always" or "usually" met versus mentors (89% vs. 77%; p = 0.096). Two barriers to successful mentorship included time and communication, with most pairs communicating by email. Most respondents (91%) planned to continue the relationship beyond the EAST Mentoring Program and recommended the experience to colleagues. Mentee satisfaction with the EAST Mentoring Program was high. Mentoring is a beneficial tool to promote success among EAST's young members, but differences exist between mentee and mentor perceptions. Revising communication expectations and time commitment to improve career development may help our young acute care surgeons.
Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less
Capability Investment Strategy to Enable JPL Future Space Missions
NASA Technical Reports Server (NTRS)
Lincoln, William; Merida, Sofia; Adumitroaie, Virgil; Weisbin, Charles R.
2006-01-01
The Jet Propulsion Laboratory (JPL) formulates and conducts deep space missions for NASA (the National Aeronautics and Space Administration). The Chief Technologist of JPL has responsibility for strategic planning of the laboratory's advanced technology program to assure that the required technological capabilities to enable future missions are ready as needed. The responsibilities include development of a Strategic Plan (Antonsson, E., 2005). As part of the planning effort, a structured approach to technology prioritization, based upon the work of the START (Strategic Assessment of Risk and Technology) (Weisbin, C.R., 2004) team, was developed. The purpose of this paper is to describe this approach and present its current status relative to the JPL technology investment.
Long range planning for the development of space flight emergency systems.
NASA Technical Reports Server (NTRS)
Bolger, P. H.; Childs, C. W.
1972-01-01
The importance of long-range planning for space flight emergency systems is pointed out. Factors in emergency systems planning are considered, giving attention to some of the mission classes which have to be taken into account. Examples of the hazards in space flight include fire, decompression, mechanical structure failures, radiation, collision, and meteoroid penetration. The criteria for rescue vehicles are examined together with aspects regarding the conduction of rescue missions. Future space flight programs are discussed, taking into consideration low earth orbit space stations, geosynchronous orbit space stations, lunar operations, manned planetary missions, future space flight vehicles, the space shuttle, special purpose space vehicles, and a reusable nuclear shuttle.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yarmand, H; Winey, B; Craft, D
2014-06-15
Purpose: To efficiently find quality-guaranteed treatment plans with the minimum number of beams for stereotactic body radiation therapy using RayStation. Methods: For a pre-specified pool of candidate beams we use RayStation (a treatment planning software for clinical use) to identify the deliverable plan which uses all the beams with the minimum dose to organs at risk (OARs) and dose to the tumor and other structures in specified ranges. Then use the dose matrix information for the generated apertures from RayStation to solve a linear program to find the ideal plan with the same objective and constraints allowing use of allmore » beams. Finally we solve a mixed integer programming formulation of the beam angle optimization problem (BAO) with the objective of minimizing the number of beams while remaining in a predetermined epsilon-optimality of the ideal plan with respect to the dose to OARs. Since the treatment plan optimization is a multicriteria optimization problem, the planner can exploit the multicriteria optimization capability of RayStation to navigate the ideal dose distribution Pareto surface and select a plan of desired target coverage versus OARs sparing, and then use the proposed technique to reduce the number of beams while guaranteeing quality. For the numerical experiments two liver cases and one lung case with 33 non-coplanar beams are considered. Results: The ideal plan uses an impractically large number of beams. The proposed technique reduces the number of beams to the range of practical application (5 to 9 beams) while remaining in the epsilon-optimal range of 1% to 5% optimality gap. Conclusion: The proposed method can be integrated into a general algorithm for fast navigation of the ideal dose distribution Pareto surface and finding the treatment plan with the minimum number of beams, which corresponds to the delivery time, in epsilon-optimality range of the desired ideal plan. The project was supported by the Federal Share of program income earned by Massachusetts General Hospital on C06 CA059267, Proton Therapy Research and Treatment Center and partially by RaySearch Laboratories.« less
Adoption of Soil Health Improvement Strategies by Australian Farmers: II. Impediments and Incentives
ERIC Educational Resources Information Center
Bennett, J. McL.; Cattle, S. R.
2014-01-01
Purpose: Many farmers remain hesitant to implement structured management plans and strategies tailored to address soil health, irrespective of mounting scientific evidence for the credibility of certain soil health indicators, an increase in the reporting of program benefits and progress in communicating these benefits. Hence, the purpose of this…
Design, Implementation, and Evaluation of a Postgraduate Diploma in Surgical Anatomy
ERIC Educational Resources Information Center
Stringer, Mark D.; Lyall, Patrick
2012-01-01
After careful planning, a postgraduate Diploma in Surgical Anatomy was launched in 2009. This report describes the structure of the program, the challenges encountered in implementing and running the course, and results of evaluations. The qualification is targeted at junior doctors intending to become surgeons or radiologists and aims to equip…
30 CFR 784.16 - Reclamation plan: Siltation structures, impoundments, and refuse piles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Resources Conservation Service's Web site athttp://www.info.usda.gov/scripts/lpsiis.dll/TR/TR_210_60.htm... State program approval process engineering design standards that ensure stability comparable to a 1.3 minimum static safety factor in lieu of engineering tests to establish compliance with the minimum static...
30 CFR 780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Resources Conservation Service's Web site at http://www.info.usda.gov/scripts/lpsiis.dll/TR/TR_210_60.htm... authority may establish through the State program approval process, engineering design standards that ensure stability comparable to a 1.3 minimum static safety factor in lieu of engineering tests to establish...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-21
... ensure that the structural components of each state's air quality management program are adequate to meet... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R07-OAR-2013-0208; FRL-9825-7] Approval and... Fine Particulate Matter National Ambient Air Quality Standards AGENCY: Environmental Protection Agency...
Arizona History Resource Guide: A Resource Guide for Arizona Classroom Teachers.
ERIC Educational Resources Information Center
Arizona State Dept. of Education, Phoenix.
The resource guide is structured for Arizona history and social studies teachers as an aid in planning classroom activities for kindergarten through grade 12. Developed as part of the Bicentennial program, the guide focuses on the themes of heritage, festival, and horizons. The heritage section furnishes a historical perspective for organizing…
The Plan for Donations or "Don'tations": The Case of the Alumni-Funded Entrepreneurship Center
ERIC Educational Resources Information Center
Olsen, Mona Anita Kristiansen
2012-01-01
This case was developed for use in a course on entrepreneurial education that focuses on leadership. Background from Blue Stone University, including information on its mission, organizational structure, metrics, entrepreneurial programs, and stakeholders, is presented. This case explores how a school within a university approached the creation of…
Education Budget Plan Wielded as Policy Lever
ERIC Educational Resources Information Center
Klein, Alyson
2010-01-01
President Barack Obama's proposed $49.7 billion budget for the U.S. Department of Education is more than just a spending blueprint: Department officials portray it as a fundamental reimagining of the agency's structure and management. Under the fiscal 2011 proposal unveiled last week, a roster of 38 relatively small, targeted grant programs would…
ERIC Educational Resources Information Center
Johnson, Elizabeth H.
Structures for governing and coordinating higher education are changing. However, the primary responsibility for education rests with the state. The coordinating agency, which occupies the middle-ground between the institutions and the political decision-makers, should have 5 minimum abilities: (1) to engage in continuous planning, both long-range…
ERIC Educational Resources Information Center
Griggs, Dorothy Feldbinder; Shannon, Mary Louise
At Florida Junior College at Jacksonville, public speaking instructors employ Jerome S. Bruner's four factors of learning--predisposition to learn, structure of knowledge, sequence, and reinforcement--to plan an effective learning program for students with diverse academic backgrounds and goals. Specifically, six learning units, tailored to both…
The Development of the New York State Bank of Reading Objectives.
ERIC Educational Resources Information Center
O'Reilly, Robert P.
This report presents the rationale, structure, content and procedures for the computerized bank of reading objectives being developed for New York State schools. The project was initiated to provide a technical resource which would contribute to planning, design, and evaluation of reading programs. The report defines the organizing concepts for…
SCHOOL SAFETY EDUCATION CHECKLIST--ADMINISTRATION, INSTRUCTION, PROTECTION.
ERIC Educational Resources Information Center
National Education Association, Washington, DC.
THIS CHECKLIST IS AN EVALUATIVE TOOL FOR PLANNING PROGRAM IMPROVEMENT. PURPOSING TO STIMULATE THOUGHT AND ACTION ON PROBLEMS OF SAFETY EDUCATION IN SCHOOLS, IT IS DESIGNED TO ENCOURAGE INSPECTIONS OF SCHOOL BUILDINGS FOR (1) SAFE CONDITIONS OF STRUCTURES, GROUNDS, AND EQUIPMENT, (2) SAFE PRACTICES, AND (3) OPTIMUM USE OF THESE SAFE PRACTICES IN…
Cost of Special Education Programs in California.
ERIC Educational Resources Information Center
Keefe, R. F.; And Others
The document reports a study for the California State Department of Education to provide clarification of existing studies and reports on the cost of special education in California. Chapter 1 covers the background of the study, purpose and plan, study design (which included review of existing cost reports and studies and structured interviews…
ERIC Educational Resources Information Center
Texas A and M Univ., College Station. Vocational Instructional Services.
This course outline, the second volume of a two-volume set, consists of lesson plans for pre-employment laboratory training in general agricultural mechanics. Covered in the eight lessons included in this volume are cold metal work, soldering, agricultural safety programs, farm shops, farm structures, farm and ranch electrification, soil and water…
How Will Welfare Reform Affect Childbearing and Family Structure Decisions? Discussion Paper.
ERIC Educational Resources Information Center
Peters, H. Elizabeth; Plotnick, Robert D.; Jeong, Se-Ook
This paper summarizes changes in key elements of welfare policy and in closely related policies on child support enforcement and sex education and family planning programs. Drawing on a conceptual framework that highlights how incentives created by public policy can affect demographic behaviors, the paper concludes that, as Congress intended,…
ERIC Educational Resources Information Center
Krueger, Mark
2009-01-01
Child and youth care is a process of human interaction in which knowing, doing, and being in are interconnected. People learn as much as they can about development, program planning, structure, and techniques, but nothing works very well without the capacity to be present and involved in the lives of youth, with curiosity and sensitivity to the…
The Role of Structural Models in the Solar Sail Flight Validation Process
NASA Technical Reports Server (NTRS)
Johnston, John D.
2004-01-01
NASA is currently soliciting proposals via the New Millennium Program ST-9 opportunity for a potential Solar Sail Flight Validation (SSFV) experiment to develop and operate in space a deployable solar sail that can be steered and provides measurable acceleration. The approach planned for this experiment is to test and validate models and processes for solar sail design, fabrication, deployment, and flight. These models and processes would then be used to design, fabricate, and operate scaleable solar sails for future space science missions. There are six validation objectives planned for the ST9 SSFV experiment: 1) Validate solar sail design tools and fabrication methods; 2) Validate controlled deployment; 3) Validate in space structural characteristics (focus of poster); 4) Validate solar sail attitude control; 5) Validate solar sail thrust performance; 6) Characterize the sail's electromagnetic interaction with the space environment. This poster presents a top-level assessment of the role of structural models in the validation process for in-space structural characteristics.
Use of family planning methods in Kassala, Eastern Sudan
2011-01-01
Background Investigating use and determinants of family planning methods may be instructive in the design of interventions to improve reproductive health services. Findings Across sectional community-based study was conducted during the period February-April 2010 to investigate the use of family planning in Kassala, eastern Sudan. Structured questionnaires were used to gather socio-demographic data and use of family planning. The mean ± SD of the age and parity of 613 enrolled women was 31.1 ± 7 years and 3.4 ± 1.9, respectively. Only 44.0% of these women had previously or currently used one or more of the family planning methods. Combined pills (46.7%) and progesterone injection (17.8%) were the predominant method used by the investigated women. While age, residence were not associated with the use of family planning, parity (> five), couple education (≥ secondary level) were significantly associated with the use of family planning. Husband objection and religious beliefs were the main reasons of non-use of family planning. Conclusion Education, encouragement of health education programs and involvement of the religious persons might promote family planning in eastern Sudan. PMID:21356106
FTA multi-year research program plan (FY 2009 - FY 2013).
DOT National Transportation Integrated Search
2008-09-01
The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...
Karimi, Hossein; Rehman, Syed Shakil Ur; Gillani, Syed Amir
2017-06-01
To determine the effects of supervised structured aerobic exercise training (SSAET) program on interleukin-6 (IL-6), nitric oxide synthase 1 (NOS-1), and cyclooxygenase-2 (COX-2) in type 2 diabetes mellitus (T2DM). Randomized controlled trial. Riphah Rehabilitation and Research Centre, Railways General Hospital, Rawalpindi, from January 2015 to June 2016. Patients of either gender of minimum one year history of T2DM ranging from 40-70 years of age were included. Those with chronic systemic diseases, history of regular exercise, smoking, and those on dietary plan were excluded. Atotal of 195 patients were screened; 120 were selected and 102 agreed to participate in the study. They were randomly placed into experimental and control groups. SSAETprogram, routine medication, and dietary plan were applied in experimental group; whereas, control group was managed with routine medication and dietary plan for 25 weeks. IL-6, NOS-1, and COX-2 were assessed at baseline and 25 weeks. SSAET program, routine medication and dietary plan showed significantly improved IL-6 (pre-mean=0.25 ±0.11ng/ml, post-mean=0.19 ±0.04 ng/ml), NOS-1 (pre-median=4.65 ng/ml, IQ range=1.04 ng/ml), (post-median=2.72 ng/ml, IQ range=1.60 ng/ml), and COX-2 (pre-mean=18.72 ±4.42 ng/ml, post-mean=15.18 ±2.63 ng/ml) in experimental group, as compared with control group managed by routine medication and dietary plan, where deterioration was noted in IL-6 (pre-mean=0.23 ±0.08 ng/ml, post-mean=0.27 ±0.08 ng/ml) and COX-2 (pre-mean=18.49 ±4.56 ng/ml, postmean=19.10 ±4.76 ng/ml), while NOS-1 slight improvement (pre-mean=4.99 ng/ml, IQ range=2.67 ng/ml), (postmean=4.56 ng/ml, IQ range=3.85 ng/ml). Statistically at the baseline the p-values were not significant (p>0.05) in both experimental and control groups for IL-6, COX-2 and NOS-1; while after 25 weeks of intervention, the experimental group showed significant improvement (p<0.05) in comparison with the control group. SSAET program, routine medication, and dietary plan had positive effect on IL-6, NOS-1, and COX-2 in T2DM patients.
Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan
NASA Technical Reports Server (NTRS)
1973-01-01
The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.
Martel, Adele; Derenne, Jennifer; Chan, Vivien
2015-10-01
The purpose of this article is to determine the effectiveness of a hands-on continuing education program for practicing child and adolescent psychiatrists (CAPs) with a focus on best practices in transitioning psychiatric patients to college. The plan was to build on the unique knowledge and skill set of CAPs, use audience and facilitator feedback from prior programs to inform program content, structure, and format, and incorporate findings from the evolving literature. A 3-h interactive workshop was designed with an emphasis on audience participation. The workshop was divided into three main segments: didactics, whole group discussion/brainstorming, and small group discussion of illustrative case vignettes. Improvements and changes in knowledge, skills, and attitudes related to transition planning were identified by program participants. Quantitative feedback in the form of course evaluations, pre- and posttests, and a 6-month follow-up questionnaire indicate that the use of interactive teaching techniques is a productive learning experience for practicing CAPs. Qualitative feedback was that the discussion of the case vignettes was the most helpful. The use of a workshop format is an effective strategy to engage practicing CAPs in learning about and implementing best practices to support the transition of their patients to college and into young adulthood. Comprehensive and proactive transition planning, facilitated by clinicians, should promote the wellness of college-bound patients and help to reduce the potential risks in the setting of an upcoming transition.
Program Planners’ Perspectives of Promotora Roles, Recruitment, and Selection
Koskan, Alexis; Hilfinger Messias, DeAnne K.; Friedman, Daniela B.; Brandt, Heather M.; Walsemann, Katrina M.
2013-01-01
Objective Program planners work with promotoras (the Spanish term for female community health workers) to reduce health disparities among underserved populations. Based on the Role-Outcomes Linkage Evaluation Model for Community Health Workers (ROLES) conceptual model, we explored how program planners conceptualized the promotora role and the approaches and strategies they used to recruit, select, and sustain promotoras. Design We conducted semi-structured, in-depth interviews with a purposive convenience sample of 24 program planners, program coordinators, promotora recruiters, research principal investigators, and other individuals who worked closely with promotoras on United States-based health programs for Hispanic women (ages 18 and older). Results Planners conceptualized the promotora role based on their personal experiences and their understanding of the underlying philosophical tenets of the promotora approach. Recruitment and selection methods reflected planners’ conceptualizations and experiences of promotoras as paid staff or volunteers. Participants described a variety of program planning and implementation methods. They focused on sustainability of the programs, the intended health behavior changes or activities, and the individual promotoras. Conclusion To strengthen health programs employing the promotora delivery model, job descriptions should delineate role expectations and boundaries and better guide promotora evaluations. We suggest including additional components such as information on funding sources, program type and delivery, and sustainability outcomes to enhance the ROLES conceptual model. The expanded model can be used to guide program planners in the planning, implementing, and evaluating of promotora health programs. PMID:23039847
7 CFR 1710.407 - Business plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Business plan. 1710.407 Section 1710.407 Agriculture... Conservation Loan Program § 1710.407 Business plan. An Eligible EE Program must have a business plan for implementing the program. The business plan is expected to have a global perspective on the borrower's energy...
Reuben, David B.; Evertson, Leslie Chang; Wenger, Neil S.; Serrano, Katherine; Chodosh, Joshua; Ercoli, Linda; Tan, Zaldy S.
2013-01-01
Dementia is a chronic disease that requires both medical and social services to provide high quality of care and prevent complications. As a result of time constraints in practice, lack of systems-based approaches, and poor integration of community-based organizations (CBOs), the quality of care for dementia is poor compared to other diseases that affect older persons. The UCLA Alzheimer’s and Dementia Care (UCLA ADC) program partners with CBOs to provide comprehensive, coordinated, patient-centered care for patients with Alzheimer’s disease and other dementias. The goals of the program are to maximize patient function, independence and dignity, minimize caregiver strain and burnout and reduce unnecessary costs. The UCLA ADC program consists of five key components: patient recruitment and a dementia registry, structured needs assessments of patients in the registry and their caregivers, creation and implementation of individualized dementia care plans based on needs assessments and input from the primary care physicians, monitoring and revising care plans, as needed, and access 24/7, 365 days a year for assistance and advice. The program uses a co-management model with a nurse practitioner Dementia Care Manager working with primary care physicians and CBOs. Based on the first 150 patients served, the most common recommendations in the initial care plans were referrals to support groups (73%), Alzheimer’s Association Safe Return (73%), caregiver training (45%), and medication adjustment (41%). The program will be evaluated on its ability to achieve the triple aim of better care for individuals, better health for populations, and lower costs. PMID:24329821
2 CFR 215.25 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Revision of budget and program plans. 215.25 Section 215.25 Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserved... Program Management § 215.25 Revision of budget and program plans. (a) The budget plan is the financial...
75 FR 70061 - Dealer Floor Plan Pilot Program Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
... SMALL BUSINESS ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business... location, date, time, and agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in... Plan Pilot Program meeting will be held on November 16, 2010 from approximately 9 a.m. to 12 p.m...
Suyono, H
1996-01-01
The Indonesian Family Planning Program was officially launched in 1970 when President Suharto developed the National Family Planning Coordinating Board (BKKBN) to administrate the national family planning program. The inauguration of the family planning program came at the heels of a special demand by the people with very strong support of the ulama. The program was subsequently developed and expanded into remote areas in 1976. In 1992, a family-based approach to family planning was implemented in which every village family was made responsible for family planning. The program is based upon a very strong political commitment at the highest level as well as at the provincial, district, subdistrict, and village levels; it continuously innovates; every community can name its family planning program as it likes; and there is constant feedback to the community. Indonesia's family planning program strategies are as follows: it is suggested that couples in which the wife is aged 20-30 years have only two children; it is recommended that women over age 30 have no more children due to the comparatively high risks of pregnancy at that age; considerable effort is given to encourage youths to not become pregnant and bear children; numerous chairmen of small community family planning groups are appointed; and social and cultural conditions have been created in which people work for family planning activities. People interested in learning from the Indonesian experience in family planning may participate in the BKKBN's international training program.
Carswell, Steven B; Hanlon, Thomas E; O'Grady, Kevin E; Watts, Amy M; Pothong, Pattarapan
2009-01-01
This paper presents background, implementation, and feasibility findings associated with planning and conducting an after-school intervention program in an alternative education setting designed to prevent the initiation and escalation of violence and substance abuse among urban African American youth at high risk for life-long problem behaviors. Evolving from earlier preventive interventions implemented in clinic and school settings, the program, entitled The Village Model of Care, consisted of structured group mentoring, parental support, and community outreach services administered to alternative education students and their primary caregiver(s) during the school year. Over a two-year intake period, 109 youth participated in the present process evaluation study. Findings from the study not only provided relevant demographic information on the characteristics of youth likely to be included in such programs but also indicated the importance of including the family in the rehabilitation effort and the need for school administrative system support for the underlying alternative education approach. The information presented in this report has a direct bearing on the planning of future prevention efforts conducted in similar settings that are aimed at reducing problem behaviors and promoting positive lifestyles among high-risk youth.
2010-08-12
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Constellation Program Manager Dale Thomas talks to employees at a completion ceremony for NASA's new mobile launcher, or ML, support structure. The ceremony was held underneath the structure's launch mount opening. It took about two years to construct the launcher in the Mobile Launcher Park site, north of the Vehicle Assembly Building, or VAB. The 355-foot-tall structure will support NASA's future human spaceflight program. The base of the launcher is lighter than space shuttle mobile launcher platforms so the crawler-transporter can pick up the heavier load of the tower and a taller rocket. The next step will be to add ground support equipment, such as umbilicals and access arms, for future rocket launches. For information on NASA's future plans, visit www.nasa.gov. Photo credit: NASA/Jim Grossmann