Sample records for plans include construction

  1. Community Meeting to Focus on NREL Construction Plans

    Science.gov Websites

    Community Meeting to Focus on NREL Construction Plans For more information contact: Kerry Masson issues including planned construction projects on NREL's 300-acre campus. Construction plans include

  2. Managing the construction bidding process : a move to simpler construction plan sets

    DOT National Transportation Integrated Search

    2001-01-31

    This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...

  3. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  4. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  5. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  6. SCHOOLS OF PRESTRESSED CONCRETE. PLANNING, DESIGN AND CONSTRUCTION OF EDUCATIONAL FACILITIES FOR SCHOOLS AND COLLEGES.

    ERIC Educational Resources Information Center

    LYMAN, ROBERT J.

    THE USE OF PRESTRESSED CONCRETE IS EMPHASIZED IN THE AREAS OF SCHOOL PLANNING, DESIGN, AND CONSTRUCTION. THE PLANNING SECTION INCLUDES--(1) ROLES OF ACTIVE PARTIES AND RELATED ORGANIZATIONS, (2) PROCEDURES, AND (3) CONCEPTUAL DATA FOR SITE AND BUILDING. THE DESIGN SECTION CONTAINS--(1) DEVELOPMENT OF CONSTRUCTION SYSTEMS, (2) INTEGRATION OF…

  7. 29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...

  8. 29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...

  9. 29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...

  10. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  11. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  12. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  13. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  14. 29 CFR 1926.705 - Requirements for lift-slab construction operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...

  15. 46 CFR 110.25-1 - Plans and information required for new construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction... available at the point of application. (b) Electrical plant load analysis including connected loads and...

  16. 46 CFR 110.25-1 - Plans and information required for new construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction... available at the point of application. (b) Electrical plant load analysis including connected loads and...

  17. 43 CFR 3272.12 - What environmental protection measures must I include in my utilization plan?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must I include in my utilization plan? 3272.12 Section 3272.12 Public Lands: Interior Regulations... MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Utilization Plan and Facility Construction Permit § 3272.12 What environmental protection measures must I include in my utilization plan? (a) Describe, at a...

  18. Purpose Designed Facilities. School Buildings Planning, Design, and Construction Series No. 4.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on issues involving school space design and the kinds of spaces required in schools, including lecture spaces and seminar rooms,…

  19. The Economic Impact of Implementing the Cincinnati Public Schools' Facilities Master Plan on Greater Cincinnati.

    ERIC Educational Resources Information Center

    Rexhausen, Jeff

    The construction proposed in the Cincinnati Public Schools' Facilities Master Plan will have a significant impact on the greater Cincinnati, Ohio, economy. Highlights include: (1) the Facilities Master Plan of the Cincinnati Public Schools envisions a 10-year program with $985 million in construction spending. The funding of this program includes…

  20. PLANNING FOR SAFETY ON THE JOBSITE. SAFETY IN INDUSTRY--CONSTRUCTION INDUSTRY SERIES.

    ERIC Educational Resources Information Center

    OTTO, FRANCIS L.; VAN ATTA, F.A.

    WORK INJURIES AND THEIR MONETARY LOSSES IN THE CONSTRUCTION INDUSTRY CAN BE EFFECTIVELY PREVENTED ONLY THROUGH AN AGGRESSIVE AND WELL-PLANNED SAFETY EFFORT. THIS BULLETIN DISCUSSES THE "HOW" OF PLANNING FOR SAFETY ON THE JOBSITE. IT WAS PREPARED IN THE DIVISION OF PROGRAMING AND RESEARCH, OFFICE OF OCCUPATIONAL SAFETY. CONTENTS INCLUDE (1) THE…

  1. Expected treatment dose construction and adaptive inverse planning optimization: Implementation for offline head and neck cancer adaptive radiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yan Di; Liang Jian

    Purpose: To construct expected treatment dose for adaptive inverse planning optimization, and evaluate it on head and neck (h and n) cancer adaptive treatment modification. Methods: Adaptive inverse planning engine was developed and integrated in our in-house adaptive treatment control system. The adaptive inverse planning engine includes an expected treatment dose constructed using the daily cone beam (CB) CT images in its objective and constrains. Feasibility of the adaptive inverse planning optimization was evaluated retrospectively using daily CBCT images obtained from the image guided IMRT treatment of 19 h and n cancer patients. Adaptive treatment modification strategies with respect tomore » the time and the number of adaptive inverse planning optimization during the treatment course were evaluated using the cumulative treatment dose in organs of interest constructed using all daily CBCT images. Results: Expected treatment dose was constructed to include both the delivered dose, to date, and the estimated dose for the remaining treatment during the adaptive treatment course. It was used in treatment evaluation, as well as in constructing the objective and constraints for adaptive inverse planning optimization. The optimization engine is feasible to perform planning optimization based on preassigned treatment modification schedule. Compared to the conventional IMRT, the adaptive treatment for h and n cancer illustrated clear dose-volume improvement for all critical normal organs. The dose-volume reductions of right and left parotid glands, spine cord, brain stem and mandible were (17 {+-} 6)%, (14 {+-} 6)%, (11 {+-} 6)%, (12 {+-} 8)%, and (5 {+-} 3)% respectively with the single adaptive modification performed after the second treatment week; (24 {+-} 6)%, (22 {+-} 8)%, (21 {+-} 5)%, (19 {+-} 8)%, and (10 {+-} 6)% with three weekly modifications; and (28 {+-} 5)%, (25 {+-} 9)%, (26 {+-} 5)%, (24 {+-} 8)%, and (15 {+-} 9)% with five weekly modifications. Conclusions: Adaptive treatment modification can be implemented including the expected treatment dose in the adaptive inverse planning optimization. The retrospective evaluation results demonstrate that utilizing the weekly adaptive inverse planning optimization, the dose distribution of h and n cancer treatment can be largely improved.« less

  2. Facility Planning in the Construction Grants Program. Instructor Guide. Working for Clean Water: An Information Program for Advisory Groups.

    ERIC Educational Resources Information Center

    Buskirk, E. Drannon, Jr.; Cole, Charles A.

    Wastewater facility planning is an essential component of the federal construction grants process. Presented in this instructor's guide is a one-hour presentation on facility planning intended for citizen advisory groups. The guide is part of the Working for Clean Water Project, which also includes a supplementary audiovisual presentation.…

  3. 77 FR 58962 - Approval and Promulgation of Implementation Plans; Arizona; Nogales PM10

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... attainment year motor vehicle emissions budget if revised to include road construction PM 10 , because, as... included road construction dust when submitted in its final form, would meet the requirements of CAA... our proposal, we anticipated the necessity for ADEQ to revise the MVEB to include road construction...

  4. 40 CFR 60.3012 - What should I include in my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... management plan? 60.3012 Section 60.3012 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Compliance Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3012 What should I include in my waste management plan? A...

  5. 40 CFR 62.14590 - What should I include in my waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14590 What should I include... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What should I include in my waste...

  6. Facility Programming and Construction Criteria [Planning Guide]. 702 KAR 4:170.

    ERIC Educational Resources Information Center

    Kentucky State Dept. of Education, Frankfort. Div. of Facilities Management.

    This facility construction planning guide presents the minimum instructional space standards for Kentucky's public school system. It provides definitions of terms found in the regulations; presents space requirements for every type of instructional space within a public school, including circulation areas, storage, and mechanical/electrical areas;…

  7. Track Construction Manual.

    ERIC Educational Resources Information Center

    Banke, Ron; Di Gennaro, Guy; Ediger, Rick; Garner, Lanny; Hersom, Steve; Miller, Jack; Nemeth, Ron; Petrucelli, Jim; Sierks, Donna; Smith, Don; Swank, Kevin; West, Kevin

    This book establishes guidelines for the construction and maintenance of tracks by providing information for building new tracks or upgrading existing tracks. Subjects covered include running track planning and construction, physical layout, available surfaces, and maintenance. General track requirements and construction specifications are…

  8. Elementary Teachers' Learning to Construct High-Quality Mathematics Lesson Plans: A Use of the IES Recommendations

    ERIC Educational Resources Information Center

    Ding, Meixia; Carlson, Mary Alice

    2013-01-01

    This study explored a group of elementary teachers' ("n" = 35) learning to construct high-quality lesson plans that foster student understanding of fundamental mathematical ideas. The conceptual framework for this study was gleaned from the recently released Institute of Education Sciences (IES) recommendations, including (a)…

  9. Maintenance & construction operations user service : an addendum to the ITS program plan

    DOT National Transportation Integrated Search

    2001-01-26

    The Maintenance and Construction Operations User Service describes the need for integrating key activities. Generally, key Maintenance and Construction Operations (MCO) activities include monitoring, operating, maintaining, improving, and managing th...

  10. 30 CFR 285.626 - What must I include in my COP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Contents of the Construction and Operations Plan § 285.626 What must I include in my COP? (a) You...

  11. MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints

    DTIC Science & Technology

    2001-08-01

    progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New

  12. 25 CFR 170.411 - What may a long-range transportation plan include?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What may a long-range transportation plan include? 170.411 Section 170.411 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  13. 40 CFR 60.2630 - What should I include in my waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... management plan? 60.2630 Section 60.2630 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... Compliance Times for Commercial and Industrial Solid Waste Incineration Units that Commenced Construction On or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2630 What should I include in my...

  14. 48 CFR 2.101 - Definitions

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... whether a modification is minor include the value and size of the modification and the comparative value...

  15. 33 CFR 263.15 - Program policies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...

  16. 33 CFR 263.15 - Program policies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...

  17. Renovating and Reconstructing in Phases--Specifying Phased Construction.

    ERIC Educational Resources Information Center

    Bunzick, John

    2002-01-01

    Discusses planning for phased school construction projects, including effects on occupancy (for example, construction adjacent to occupied space, construction procedure safety zones near occupied areas, and code-complying means of egress), effects on building systems (such as heating and cooling equipment and power distribution), and contract…

  18. 41 CFR 60-4.5 - Hometown plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Hometown plans. 60-4.5...-CONSTRUCTION CONTRACTORS-AFFIRMATIVE ACTION REQUIREMENTS § 60-4.5 Hometown plans. (a) A contractor participating, either individually or through an association, in an approved Hometown Plan (including heavy...

  19. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... include the value and size of the modification and the comparative value and size of the final product...

  20. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... minor include the value and size of the modification and the comparative value and size of the final...

  1. Space architecture monograph series. Volume 4: Genesis 2: Advanced lunar outpost

    NASA Technical Reports Server (NTRS)

    Fieber, Joseph P.; Huebner-Moths, Janis; Paruleski, Kerry L.; Moore, Gary T. (Editor)

    1991-01-01

    This research and design study investigated advanced lunar habitats for astronauts and mission specialists on the Earth's moon. Design recommendations are based on environmental response to the lunar environment, human habitability (human factors and environmental behavior research), transportability (structural and materials system with least mass), constructability (minimizing extravehicular time), construction dependability and resilience, and suitability for NASA launch research missions in the 21st century. The recommended design uses lunar lava tubes, with construction being a combination of Space Station Freedom derived hard modules and light weight Kevlar laminate inflatable structures. The proposed habitat includes research labs and a biotron, crew quarters and crew support facility, mission control, health maintenance facility, maintenance work areas for psychological retreat, privacy, and comtemplation. Furniture, specialized equipment, and lighting are included in the analysis and design. Drawings include base master plans, construction sequencing, overall architectural configuration, detailed floor plans, sections and axonometrics, with interior perspectives.

  2. "Crossing the Rubicon": Understanding Chinese EFL Students' Volitional Process Underlying In-Class Participation with the Theory of Planned Behaviour

    ERIC Educational Resources Information Center

    Girardelli, Davide; Patel, Vijay K.; Martins-Shannon, Janine

    2017-01-01

    An extended model based on the theory of planned behaviour (TPB) was used to study Chinese English as a foreign language (EFL) students' in-class participation. The model included the core TPB constructs (behavioural intentions, attitudes, subjective norms, and perceived behavioural control/self-efficacy) and 2 additional constructs (foreign…

  3. 27. "SITE PLAN." Specifications No. OC15775, Drawing No. AF600915, sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. "SITE PLAN." Specifications No. OC1-57-75, Drawing No. AF-60-09-15, sheet 1 of 96, D.O. Series No. AF 1394/20, Rev. B. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 5296 Rev. B, Date: 11/17/59. Site plan of 20,000-foot track, including construction phasing notes. - Edwards Air Force Base, South Base Sled Track, Edwards Air Force Base, North of Avenue B, between 100th & 140th Streets East, Lancaster, Los Angeles County, CA

  4. Extra-terrestrial construction processes - Advancements, opportunities and challenges

    NASA Astrophysics Data System (ADS)

    Lim, Sungwoo; Prabhu, Vibha Levin; Anand, Mahesh; Taylor, Lawrence A.

    2017-10-01

    Government space agencies, including NASA and ESA, are conducting preliminary studies on building alternative space-habitat systems for deep-space exploration. Such studies include development of advanced technologies for planetary surface exploration, including an in-depth understanding of the use of local resources. Currently, NASA plans to land humans on Mars in the 2030s. Similarly, other space agencies from Europe (ESA), Canada (CSA), Russia (Roscosmos), India (ISRO), Japan (JAXA) and China (CNSA) have already initiated or announced their plans for launching a series of lunar missions over the next decade, ranging from orbiters, landers and rovers for extended stays on the lunar surface. As the Space Odyssey is one of humanity's oldest dreams, there has been a series of research works for establishing temporary or permanent settlement on other planetary bodies, including the Moon and Mars. This paper reviews current projects developing extra-terrestrial construction, broadly categorised as: (i) ISRU-based construction materials; (ii) fabrication methods; and (iii) construction processes. It also discusses four categories of challenges to developing an appropriate construction process: (i) lunar simulants; (ii) material fabrication and curing; (iii) microwave-sintering based fabrication; and (iv) fully autonomous and scaled-up construction processes.

  5. Multimodal system planning technique : an analytical approach to peak period operation

    DOT National Transportation Integrated Search

    1995-11-01

    The multimodal system planning technique described in this report is an improvement of the methodology used in the Dallas System Planning Study. The technique includes a spreadsheet-based process to identify the costs of congestion, construction, and...

  6. 10 CFR 609.4 - Submission of Pre-Applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... assets or facilities); (c) A business plan which includes an overview of the proposed project, including... project investment, development, construction, operation and maintenance; (2) A description of the new or...-Application these requirements are addressed; (d) A financing plan overview describing: (1) The amount of...

  7. 40 CFR 62.14431 - What must my waste management plan include?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... include? 62.14431 Section 62.14431 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... POLLUTANTS Federal Plan Requirements for Hospital/Medical/Infectious Waste Incinerators Constructed on or... Health Care Facilities.” This publication (AHA Catalog No. 057007) is available for purchase from the...

  8. 25 CFR 900.122 - What does an Indian tribe or tribal organization do if it wants to secure a construction contract?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.122 What does an... information available about the construction project, including construction drawings, maps, engineering... tribal organization to review all plans, specifications, engineering reports, cost estimates, and other...

  9. 7 CFR Exhibit F to Subpart A of... - Payment Bond

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Construction and Other Development Pt. 1924, Subpt... _______ day of ________19__, a copy of which is hereto attached and made a part hereof for the construction of... connection with the construction of such WORK, and for all labor cost incurred in such WORK including that by...

  10. Innovative resettlement schemes planned for the Numata Dam project

    NASA Astrophysics Data System (ADS)

    Nakayama, Mikiyasu

    2003-10-01

    The Numata Dam, planned for the Tone River basin of Gunma Prefecture, was the largest dam construction project ever considered in Japan. This dam construction project, however, did not materialize. The proposal for the Numata Dam was first launched in 1959, at a time when the Tokyo Metropolitan area was mushrooming, both in population and industrial activity. The Numata Dam was supposed to be a prioritized dam construction project to alleviate the then anticipated water shortage in the Tokyo Metropolitan area. The Numata Dam plan experienced fierce opposition from those who would have been obliged to resettle, whereas those in Tokyo and the surrounding metropolitan area welcomed the plan. The major concern of the planned Numata Dam was the number of resettlers, which was then estimated to be around 3000 families. The resettlement plan developed for the Numata Dam included some innovative concepts, which may be applicable even today, for dam construction projects in the developing world. The plan included such ideas as (a) having resettlers share existing farmland with the present owners provided improvements were made to increase productivity, (b) paying rent to resettlers, and (c) establishing the Tone River Development Agency. After more than a decade of debate, both at national and local levels, the Numata Dam project was finally discarded through a decision of the Prime Minister in 1972. The resettlement schemes elaborated for the Numata Dam still appear to be innovative. Such schemes may be applied to projects in the developing world, in particular, in nations that are about to take off with economic development. Copyright

  11. Industry Studies 2002: Construction

    DTIC Science & Technology

    2002-01-01

    Jacksonville, FL Rotary Club of San Juan, San Juan, PR Tren Urbano Subway Project, San Juan, PR U.S. Army South, San Juan, PR U.S. Coast Guard Housing Project...Bechtel Corporation (IBM Plant Construction Site), Shanghai American Chamber of Commerce, Shanghai Urban Planning Exhibit, Shanghai 3 INTRODUCTION The...of states have or are working on a statewide or agency-wide privatization plan , including California, Maryland, Massachusetts, Michigan and

  12. 26 CFR 1.23-3 - Special rules.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... conform to the plans or specifications of the completed building. For this purpose, construction includes... construction or reconstruction of a dwelling. In the case of renewable energy source expenditures in connection with the construction or reconstruction of a dwelling that becomes the taxpayer's new principal...

  13. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  14. 30 CFR 817.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed, constructed and... surveyor, to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 817.49 of...

  15. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  16. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  17. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  18. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  19. Projecting Labor Requirements for Transportation-Related Construction. Final Report.

    ERIC Educational Resources Information Center

    Washington Technical Inst., Washington, DC. Center for Urban Services.

    This report examines the urban transportation planning process and its labor market impact, including projections of opportunities for minority participation in construction, operation, and maintenance of a transportation system and forecasts of training needed in critical occupations. It was found that transportation-related construction may be…

  20. Problem Solving in a Middle School Robotics Design Classroom

    NASA Astrophysics Data System (ADS)

    Norton, Stephen J.; McRobbie, Campbell J.; Ginns, Ian S.

    2007-07-01

    Little research has been conducted on how students work when they are required to plan, build and evaluate artefacts in technology rich learning environments such as those supported by tools including flow charts, Labview programming and Lego construction. In this study, activity theory was used as an analytic tool to examine the social construction of meaning. There was a focus on the effect of teachers’ goals and the rules they enacted upon student use of the flow chart planning tool, and the tools of the programming language Labview and Lego construction. It was found that the articulation of a teacher’s goals via rules and divisions of labour helped to form distinct communities of learning and influenced the development of different problem solving strategies. The use of the planning tool flow charting was associated with continuity of approach, integration of problem solutions including appreciation of the nexus between construction and programming, and greater educational transformation. Students who flow charted defined problems in a more holistic way and demonstrated more methodical, insightful and integrated approaches to their use of tools. The findings have implications for teaching in design dominated learning environments.

  1. FHWA road tunnel design guidelines

    DOT National Transportation Integrated Search

    2004-07-01

    This document provides technical criteria and guidance for the planning and design of road tunnels. Specific areas covered include planning, studies and investigations, design, and design of construction, of tunnels and shafts. Performance concepts a...

  2. 46 CFR 71.65-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) [Reserved] (h) Crew's accommodations. (1) Arrangement plans showing accommodations, ventilation, escapes... Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The principal details of... stability. Plans and calculations required by subchapter S of this chapter. (d) Fire control. (1) Fire...

  3. 46 CFR 91.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of liferafts and buoyant apparatus. (h) Crew's accommodations. (1) Arrangement plans showing... Drains Penetrating Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The...) Subdivision and stability. Plans and calculations as required by Subchapter S of this chapter. (d) Fire...

  4. 46 CFR 71.65-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... apparatus. (2) [Reserved] (h) Crew's accommodations. (1) Arrangement plans showing accommodations... Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The principal details of... stability. Plans and calculations required by subchapter S of this chapter. (d) Fire control. (1) Fire...

  5. 46 CFR 91.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of liferafts and buoyant apparatus. (h) Crew's accommodations. (1) Arrangement plans showing... Drains Penetrating Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The...) Subdivision and stability. Plans and calculations as required by Subchapter S of this chapter. (d) Fire...

  6. 46 CFR 71.65-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... apparatus. (2) [Reserved] (h) Crew's accommodations. (1) Arrangement plans showing accommodations... Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The principal details of... stability. Plans and calculations required by subchapter S of this chapter. (d) Fire control. (1) Fire...

  7. 46 CFR 71.65-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... apparatus. (2) [Reserved] (h) Crew's accommodations. (1) Arrangement plans showing accommodations... Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The principal details of... stability. Plans and calculations required by subchapter S of this chapter. (d) Fire control. (1) Fire...

  8. 46 CFR 91.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of liferafts and buoyant apparatus. (h) Crew's accommodations. (1) Arrangement plans showing... Drains Penetrating Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The...) Subdivision and stability. Plans and calculations as required by Subchapter S of this chapter. (d) Fire...

  9. MONROE COMMUNITY COLLEGE CAMPUS PLAN.

    ERIC Educational Resources Information Center

    Caudill, Rowlett, Scott and Associates, Bryan, TX.

    THE MASTER PLANS FOR THE CONSTRUCTION OF THE CAMPUS OF THE NEW MONROE COMMUNITY COLLEGE INCLUDE EDUCATIONAL SPECIFICATIONS, SITE ANALYSIS DATA AND BUILDING PLANS. THE EDUCATIONAL SPECIFICATIONS ARE BASED UPON COMMUNITY NEEDS AND ENROLLMENT PROJECTIONS, AND REFLECT SPACE REQUIREMENTS. IN THE SITE ANALYSIS, FACTORS SUCH AS TOPOGRAPHY, CLIMATE,…

  10. Construction. A Report on the Industry

    DTIC Science & Technology

    2004-06-01

    Transportation and Tres Urbano Subway Project, San Juan, Puerto Rico U.S. Corps of Engineers, San Juan, Puerto Rico U.S. Corps of Engineers, Mobile...recently approved a plan to privatize construction of over 6,000 miles of expressways through the use of a build, transfer, and operate options.xl...security standards in Federal facilities, including an aggressive plan to build and renovate embassies and consular offices worldwide.xlv The

  11. Technical Handbook for Facilities Engineering and Construction Manual, Part 2: Federally Assisted Activities. Guide for Project Applicants-Construction Management Services. Department Technical Handbook Series.

    ERIC Educational Resources Information Center

    Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.

    This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…

  12. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary engineering data, cost estimates for design and construction of the treatment works, and a schedule for...

  13. Planning for a New Generation of Public Library Buildings. The Greenwood Library Management Collection.

    ERIC Educational Resources Information Center

    McCabe, Gerard B.

    This book on public library design and construction contains the following chapters: (1) "Beginning the Plan"; (2) "Data for Planning"; (3) "Location: Finding a Site"; (4) "Interior Design"; (5) "Furnishing and Equipping the Library and Its Environs"; (6) "Other Views," including "Using Small College Library Planning Techniques in Public Library…

  14. Single Sheet Agricultural Mechanics Plans.

    ERIC Educational Resources Information Center

    Schumacher, Leon, Ed.

    This packet contains 25 single-page plans for agricultural mechanics projects. Each plan consists of a one-page set of drawings of the object to be made with a list of needed materials, a cut list, and step-by-step construction procedures on the back of the page. Plans for the following wood projects are included: bluebird house, lawn seat, dog…

  15. The Utilization and Design of Physical Facilities for the Rehabilitation of Mentally Retarded. Final Project Report.

    ERIC Educational Resources Information Center

    Bair, Howard V.; Leland, Henry

    To investigate the appropriate design and utilization of physical facilities being constructed as a rehabilitation center, a variety of centers was examined. Conclusions were that flexibility in construction of the physical plant, including nonpermanent walls and fixtures was necessary; program planning should be included in architectural…

  16. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  17. 30 CFR 75.1507 - Emergency Response Plan; refuge alternatives.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....1507 Emergency Response Plan; refuge alternatives. (a) The Emergency Response Plan (ERP) shall include... request and the District Manager may approve an alternative location in the ERP if mining involves two... constructed prior to an event in a secure space and an isolated atmosphere, the ERP shall specify that— (1...

  18. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  19. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... to the States to carry out water quality management planning including but not limited to: (1...

  20. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  1. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan being...

  2. 40 CFR 35.2023 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1...

  3. Oregon Department of Transportation research leader : fall 2008.

    DOT National Transportation Integrated Search

    2008-01-01

    The newsletter includes: : 1) To ensure safe travel through construction work zones, Traffic Control Plans (TCPs) are developed to communicate required traffic control measures to the construction team. The quality of the design and implementation of...

  4. 30 CFR 285.626 - What must I include in my COP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What must I include in my COP? 285.626 Section 285.626 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT... CONTINENTAL SHELF Plans and Information Requirements Contents of the Construction and Operations Plan § 285...

  5. Determinants of customers' intention to participate in a Korean restaurant health promotion program: an application of the theory of planned behavior.

    PubMed

    Hong, Kyungeui; Gittelsohn, Joel; Joung, Hyojee

    2010-06-01

    The purpose of this study was to investigate the effects of personal characteristics and theory of planned behavior (TPB) constructs on the intention to participate in a restaurant health promotion program. In total, 830 adults residing in Seoul were sampled by a multi-stage cluster and random sampling design. Data were collected from a structured self-administered questionnaire, which covered variables concerning demographics, health status and TPB constructs including attitude, subjective norm and perceived behavioral control. A path analysis combining personal characteristics and TPB constructs was used to investigate determinants of the customers' intention. Positive and negative attitudes, subjective norms and perceived behavioral control directly affected the intention to participate. Demographics and health status both directly and indirectly affected the intention to participate. This study identifies personal characteristics and TPB constructs that are important to planning and implementing a restaurant health promotion program.

  6. Agent independent task planning

    NASA Technical Reports Server (NTRS)

    Davis, William S.

    1990-01-01

    Agent-Independent Planning is a technique that allows the construction of activity plans without regard to the agent that will perform them. Once generated, a plan is then validated and translated into instructions for a particular agent, whether a robot, crewmember, or software-based control system. Because Space Station Freedom (SSF) is planned for orbital operations for approximately thirty years, it will almost certainly experience numerous enhancements and upgrades, including upgrades in robotic manipulators. Agent-Independent Planning provides the capability to construct plans for SSF operations, independent of specific robotic systems, by combining techniques of object oriented modeling, nonlinear planning and temporal logic. Since a plan is validated using the physical and functional models of a particular agent, new robotic systems can be developed and integrated with existing operations in a robust manner. This technique also provides the capability to generate plans for crewmembers with varying skill levels, and later apply these same plans to more sophisticated robotic manipulators made available by evolutions in technology.

  7. 42 CFR 136.101 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HEALTH AND HUMAN SERVICES INDIAN HEALTH Grants for Development, Construction, and Operation of... including feasibility studies, construction, operation, provision, or maintenance of services and facilities provided to Indians and, (b) for projects for planning, training, evaluation or other activities designed...

  8. 5. Photographic copy of engineering drawing showing plans, elevation and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of engineering drawing showing plans, elevation and section of Deluge Water System, including reservior (4316), Pump House (4317), and water tower. Job No. Muroc A(5-ll), Military Construction, San Bernardino-Mojave Area, San Bernardino, California: Muroc Bombing Range, Muroc Lake, California.; Additional Facilities for Materiel Center Flight Test Base, Water Supply System, Plans and Sections, Sheet 5 of 10, May 1943. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, Deluge Water Pumping Station, Near Second & D Streets, Boron, Kern County, CA

  9. 7 CFR 761.10 - Planning and performing construction and other development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the Agency with an estimate of the total cash cost of all planned development prior to loan approval; (2) Must show proof of sufficient funds to pay for the total cash cost of all planned development at... regulations, including building, plumbing, mechanical, electrical, water, and waste management. (4) The Agency...

  10. 24 CFR 203.204 - Requirements and limitations of a plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... claims covered under § 203.205. Warranties set forth in a Plan must comply with section 2301(a)(1)-(13... homeowner complaints covered by a Plan, including those regarding construction deficiencies and structural defects claims, will be settled in the amount of their actual cost to correct or for the original sales...

  11. 24 CFR 203.204 - Requirements and limitations of a plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... claims covered under § 203.205. Warranties set forth in a Plan must comply with section 2301(a)(1)-(13... homeowner complaints covered by a Plan, including those regarding construction deficiencies and structural defects claims, will be settled in the amount of their actual cost to correct or for the original sales...

  12. 24 CFR 203.204 - Requirements and limitations of a plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... claims covered under § 203.205. Warranties set forth in a Plan must comply with section 2301(a)(1)-(13... homeowner complaints covered by a Plan, including those regarding construction deficiencies and structural defects claims, will be settled in the amount of their actual cost to correct or for the original sales...

  13. 24 CFR 203.204 - Requirements and limitations of a plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... claims covered under § 203.205. Warranties set forth in a Plan must comply with section 2301(a)(1)-(13... homeowner complaints covered by a Plan, including those regarding construction deficiencies and structural defects claims, will be settled in the amount of their actual cost to correct or for the original sales...

  14. 24 CFR 203.204 - Requirements and limitations of a plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... claims covered under § 203.205. Warranties set forth in a Plan must comply with section 2301(a)(1)-(13... homeowner complaints covered by a Plan, including those regarding construction deficiencies and structural defects claims, will be settled in the amount of their actual cost to correct or for the original sales...

  15. 76 FR 13600 - Payette National Forest, Idaho, Golden Hand #3 and #4 Lode Mining Claims, Plan of Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    .... 3 and No. 4 Lode Mining Claims Proposed Plan of Operations. The project included mining operations on the lode claims along with associated activities such as road maintenance and construction. The... Mining Claims, Plan of Operations AGENCY: Forest Service, USDA. ACTION: Notice of withdrawal. SUMMARY...

  16. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... appropriate conveyance. Project-related planning costs outlined in § 64.9(a)(3), may be incurred prior to...) Construction costs associated with developing the right-of-way for recreation use. (3) Project-related planning required for the acquisition, development and use of the abandoned rights-of-way including master planning...

  17. 40 CFR 60.1380 - What must I include in my notice of construction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... waste combustion unit. (2) The planned initial startup date of your municipal waste combustion unit. (3) The types of fuels you plan to combust in your municipal waste combustion unit. (4) The capacity of...

  18. 40 CFR 60.1380 - What must I include in my notice of construction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... waste combustion unit. (2) The planned initial startup date of your municipal waste combustion unit. (3) The types of fuels you plan to combust in your municipal waste combustion unit. (4) The capacity of...

  19. 40 CFR 60.1380 - What must I include in my notice of construction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... waste combustion unit. (2) The planned initial startup date of your municipal waste combustion unit. (3) The types of fuels you plan to combust in your municipal waste combustion unit. (4) The capacity of...

  20. 40 CFR 60.1380 - What must I include in my notice of construction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... waste combustion unit. (2) The planned initial startup date of your municipal waste combustion unit. (3) The types of fuels you plan to combust in your municipal waste combustion unit. (4) The capacity of...

  1. 40 CFR 60.1380 - What must I include in my notice of construction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... waste combustion unit. (2) The planned initial startup date of your municipal waste combustion unit. (3) The types of fuels you plan to combust in your municipal waste combustion unit. (4) The capacity of...

  2. Solar power satellite system definition study, phase 2.

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A program plan for the Solar Power Satellite Program is presented. The plan includes research, development, and evaluation phase, engineering and development and cost verification phase, prototype construction, and commercialization. Cost estimates and task requirements are given for the following technology areas: (1) solar arrays; (2) thermal engines and thermal systems; (3) power transmission (to earth); (4) large space structures; (5) materials technology; (6) system control; (7) space construction; (8) space transportation; (9) power distribution, and space environment effects.

  3. 42 CFR 137.280 - Construction Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... during which planning services are provided. Planning services may include performing a needs assessment... environmental assessment nor an environmental impact statement is required. Any procedures under this section... environmental review activities and justifying the need for the project. SHPO means State Historic Preservation...

  4. 42 CFR 137.280 - Construction Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... during which planning services are provided. Planning services may include performing a needs assessment... environmental assessment nor an environmental impact statement is required. Any procedures under this section... environmental review activities and justifying the need for the project. SHPO means State Historic Preservation...

  5. 42 CFR 137.280 - Construction Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... during which planning services are provided. Planning services may include performing a needs assessment... environmental assessment nor an environmental impact statement is required. Any procedures under this section... environmental review activities and justifying the need for the project. SHPO means State Historic Preservation...

  6. 42 CFR 137.280 - Construction Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... during which planning services are provided. Planning services may include performing a needs assessment... environmental assessment nor an environmental impact statement is required. Any procedures under this section... environmental review activities and justifying the need for the project. SHPO means State Historic Preservation...

  7. 42 CFR 137.280 - Construction Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... during which planning services are provided. Planning services may include performing a needs assessment... environmental assessment nor an environmental impact statement is required. Any procedures under this section... environmental review activities and justifying the need for the project. SHPO means State Historic Preservation...

  8. Construction Management for Educational Facilities: Professional Services' Procurement and Competitive Bid Statutes.

    ERIC Educational Resources Information Center

    Goldblatt, Steven M.; Wood, R. Craig

    Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…

  9. Constructing a modern cytology laboratory: A toolkit for planning and design.

    PubMed

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A

    2013-01-01

    Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects.

  10. Constructing a modern cytology laboratory: A toolkit for planning and design

    PubMed Central

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A.

    2013-01-01

    Introduction: Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. Methods: The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction phase. Results: The project fitted out a total of 9,000 square feet; 4,000 laboratory and 5,000 office/support. Lab space includes areas for Prep, CT screening, sign out and Imaging. Adjacent space houses faculty offices and conferencing facilities. Transportation time was reduced (waste removal) by a Pneumatic Tube System, specimen drop window to Prep Lab and a pass thru window to the screening area. Open screening and prep areas allow visual management control. Efficiencies were gained by ergonomically placing CT Manual and Imaging microscopes and computers in close proximity, also facilitating a paperless workflow for additional savings. Logistically, closer proximity to Surgical Pathology maximized the natural synergies between the areas. Conclusions: Lab construction should be a systematic process based on sound principles for safety, high quality testing, and finance. Our detailed planning and design process can be a model for others undertaking similar projects PMID:23599722

  11. 75 FR 38502 - Notice of Availability of Draft Environmental Impact Statement for the Sunridge Properties in the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... require the filling of approximately 29.7 acres of waters of the United States, including wetlands. The... projects in the Sunridge Specific Plan area have been built. The Proposed Action is the construction of the... approximately 1.4 acres of waters of the U.S., including wetlands, to construct 134 houses, roadways, and other...

  12. PLANNING YOUR PLAYGROUND.

    ERIC Educational Resources Information Center

    Burke (J.E.) Co., Fond du Lac, WI.

    REVIEWS THE VALUE OF PLAYGROUND APPARATUS, FACTORS IN SELECTION OF EQUIPMENT, AND CONSIDERATIONS IN PLANNING PLAYGROUNDS. ALSO INCLUDED ARE SECTIONS ON TYPES OF PLAY DEVICES, CONSTRUCTION OF PLAYGROUND APPARATUS, UNUSUAL PLAYGROUND APPARATUS, CARE OF EQUIPMENT, SOURCES OF ACCIDENTS OR DANGERS ON PLAYGROUNDS, AND EQUIPMENT SPACE REQUIREMENTS.…

  13. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  14. 7 CFR 1710.251 - Construction work plans-distribution borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... generation facilities; (11) Load management equipment, automatic sectionalizing facilities, and centralized... transmission plant, and improvements replacements, and retirements of any generation plant. Construction of new generation capacity need not be included in a CWP but must be specified and supported by specific engineering...

  15. Cultural Resource Protection Plan for the Remote-Handled Low-Level Waste Disposal Facility at the Idaho National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pace, Brenda Ringe; Gilbert, Hollie Kae

    2015-05-01

    This plan addresses cultural resource protection procedures to be implemented during construction of the Remote Handled Low Level Waste project at the Idaho National Laboratory. The plan proposes pre-construction review of proposed ground disturbing activities to confirm avoidance of cultural resources. Depending on the final project footprint, cultural resource protection strategies might also include additional survey, protective fencing, cultural resource mapping and relocation of surface artifacts, collection of surface artifacts for permanent curation, confirmation of undisturbed historic canal segments outside the area of potential effects for construction, and/or archaeological test excavations to assess potential subsurface cultural deposits at known culturalmore » resource locations. Additionally, all initial ground disturbing activities will be monitored for subsurface cultural resource finds, cultural resource sensitivity training will be conducted for all construction field personnel, and a stop work procedure will be implemented to guide assessment and protection of any unanticipated discoveries after initial monitoring of ground disturbance.« less

  16. 46 CFR 127.110 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2014-10-01 2014-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...

  17. 46 CFR 127.110 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2012-10-01 2012-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...

  18. 46 CFR 127.110 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) General Arrangement Plans. (3) Safety Plan (Fire-Control Plan), for OCMI review and approval. (b) Hull... 46 Shipping 4 2013-10-01 2013-10-01 false Plans and specifications required for new construction... SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Plan Approval § 127.110 Plans and specifications required...

  19. 46 CFR 160.170-13 - Approval inspections and tests for prototype automatic release mechanisms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... as built. The plans must include, in triplicate, the instructions for training and maintenance... determine that the prototype— (A) Conforms with the plans reviewed under § 160.170-9 of this subpart; (B) Is constructed by the methods and with the materials specified in the plans reviewed under § 160.170-9 of this...

  20. 46 CFR 160.170-13 - Approval inspections and tests for prototype automatic release mechanisms.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... as built. The plans must include, in triplicate, the instructions for training and maintenance... determine that the prototype— (A) Conforms with the plans reviewed under § 160.170-9 of this subpart; (B) Is constructed by the methods and with the materials specified in the plans reviewed under § 160.170-9 of this...

  1. 46 CFR 160.170-13 - Approval inspections and tests for prototype automatic release mechanisms.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... as built. The plans must include, in triplicate, the instructions for training and maintenance... determine that the prototype— (A) Conforms with the plans reviewed under § 160.170-9 of this subpart; (B) Is constructed by the methods and with the materials specified in the plans reviewed under § 160.170-9 of this...

  2. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and... designed and as approved in the reclamation plan. (4) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this chapter. (5) Siltation structures...

  3. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 35.917-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary...

  4. 40 CFR 35.917-1 - Content of facilities plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 35.917-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-1... construction drawings and specifications are to be prepared. This description shall include preliminary...

  5. 75 FR 31463 - Comal County Regional Habitat Conservation Plan, Comal County, TX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-03

    ... as school development, road construction and maintenance, and parkland. The ITP will cover Comal... activities including, but not limited to: Public or private construction and development, utility... Wildlife Service, 10711 Burnet Road, Suite 200, Austin, TX 78758 or 512-490-0057. SUPPLEMENTARY INFORMATION...

  6. 30 CFR 585.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...)? 585.620 Section 585.620 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF... conceptual decommissioning plans under your commercial lease, including your project easement. BOEM will...

  7. 30 CFR 585.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...)? 585.620 Section 585.620 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF... conceptual decommissioning plans under your commercial lease, including your project easement. BOEM will...

  8. 30 CFR 585.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...)? 585.620 Section 585.620 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF... conceptual decommissioning plans under your commercial lease, including your project easement. BOEM will...

  9. Wake County Public School System Design Guidelines.

    ERIC Educational Resources Information Center

    Wake County Public School System, Raleigh, NC.

    The Wake County Public School System has published its guidelines for planning and design of functional, cost effective, and durable educational facilities that are attractive and enhance the students' educational experience. The guidelines present basic planning requirement and design criteria for the entire construction process, including: codes…

  10. 40 CFR 62.13108 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Industrial Solid Waste Incineration Units. The State Plan includes revisions to Rule 102 and Rule 405 of the... Industrial Solid Waste Incineration Units for which construction commenced on or before November 30, 1999... Control of Air Emissions of Designated Pollutants from Existing Commercial and Industrial Solid Waste...

  11. Hiilangaay Hydroelectric Project – Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twitchell, Sara; Stimac, Michael; Lang, Lisa

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less

  12. Tribal Child Care Facilities: A Guide to Construction and Renovation.

    ERIC Educational Resources Information Center

    National Child Care Information Center, Vienna, VA.

    This document provides technical assistance in addressing major areas of the child care facility construction and renovation process, including conducting a child care community needs assessment, identifying a site, financing costs, developing a business plan, conducting an environmental assessment, building and designing a facility, and hiring…

  13. Planning level assessment of greenhouse gas emissions for alternative transportation construction projects : carbon footprint estimator, phase II, volume I - GASCAP model.

    DOT National Transportation Integrated Search

    2014-03-01

    The GASCAP model was developed to provide a software tool for analysis of the life-cycle GHG : emissions associated with the construction and maintenance of transportation projects. This phase : of development included techniques for estimating emiss...

  14. A space crane concept for performing on-orbit assembly

    NASA Technical Reports Server (NTRS)

    Dorsey, John T.

    1992-01-01

    The topics are presented in viewgraph form and include: in-space assembly and construction enhances future mission planning flexibility; in-space assembly and construction facility concept; space crane concept with mobile base; fundamental characteristics; space crane research approach; spacecraft component positioning and assembly test-bed; and articulating joint testbed.

  15. Careers Canada. Volume 1, Careers in Construction.

    ERIC Educational Resources Information Center

    Department of Manpower and Immigration, Ottawa (Ontario).

    This pamphlet, published by the Canadian Department of Manpower and Immigration, is the first of a Careers-Canada series and describes careers in construction. The pamphlet is divided into six major sections: (1) history and importance; (2) nature of the work, including planning, contracting, site preparation, roofing, finishing, plumbing; (3)…

  16. School Building Construction and Inspection Resource Manual. Revision 1.

    ERIC Educational Resources Information Center

    Utah State Office of Education, Salt Lake City.

    This manual contains current legal requirements and information on school building construction and inspection in the state of Utah. Major topics include facilities long-range planning; the role and responsibilities of the School District Building Official; school site issues such as size and location, impact, and acquisition and development; as…

  17. Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading

    NASA Astrophysics Data System (ADS)

    Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.

    2012-12-01

    Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.

  18. 7 CFR 761.10 - Planning and performing construction and other development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 7 2011-01-01 2011-01-01 false Planning and performing construction and other... Provisions § 761.10 Planning and performing construction and other development. (a) Purpose. This section describes Agency policies regarding the planning and performing of construction and other development work...

  19. On-site monitoring of construction of Terror Lake hydroelectric project, Kodiak, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hosking, H.

    The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.

  20. Preservice Teachers' Beliefs, Attitudes, and Motivation about Technology Integration

    ERIC Educational Resources Information Center

    Cullen, Theresa A.; Greene, Barbara A.

    2011-01-01

    The Theory of Planned Behavior was used as a framework, along with Self-Determination Theory, to examine preservice teachers' motivation to include technology in their future teaching. We modified instruments to measure theoretical constructs to be applied to plans for the use of technology. Measured were: perceived behavioral control, attitudes…

  1. 46 CFR 91.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (ii) Arrangement of davits. (iii) Location and stowage of liferafts and buoyant apparatus. (h) Crew's... Drains Penetrating Shell Plating. (13) *Arrangement of the cargo gear including a stress diagram. The...) Subdivision and stability. Plans and calculations as required by Subchapter S of this chapter. (d) Fire...

  2. 46 CFR 91.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... systems. (e) Marine engineering. For plans required for marine engineering equipment and systems, see... electrical engineering, equipment and systems, see subchapter J (Electrical Engineering) of this chapter. (g... bottoms, etc., and including inboard and outboard profile. (b) Hull structure. 1 (1) *Inner Bottom Plating...

  3. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  4. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  5. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  6. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  7. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  8. Demonstration of a Spoken Dialogue Interface for Planning Activities of a Semi-autonomous Robot

    NASA Technical Reports Server (NTRS)

    Dowding, John; Frank, Jeremy; Hockey, Beth Ann; Jonsson, Ari; Aist, Gregory

    2002-01-01

    Planning and scheduling in the face of uncertainty and change pushes the capabilities of both planning and dialogue technologies by requiring complex negotiation to arrive at a workable plan. Planning for use of semi-autonomous robots involves negotiation among multiple participants with competing scientific and engineering goals to co-construct a complex plan. In NASA applications this plan construction is done under severe time pressure so having a dialogue interface to the plan construction tools can aid rapid completion of the process. But, this will put significant demands on spoken dialogue technology, particularly in the areas of dialogue management and generation. The dialogue interface will need to be able to handle the complex dialogue strategies that occur in negotiation dialogues, including hypotheticals and revisions, and the generation component will require an ability to summarize complex plans. This demonstration will describe a work in progress towards building a spoken dialogue interface to the EUROPA planner for the purposes of planning and scheduling the activities of a semi-autonomous robot. A prototype interface has been built for planning the schedule of the Personal Satellite Assistant (PSA), a mobile robot designed for micro-gravity environments that is intended for use on the Space Shuttle and International Space Station. The spoken dialogue interface gives the user the capability to ask for a description of the plan, ask specific questions about the plan, and update or modify the plan. We anticipate that a spoken dialogue interface to the planner will provide a natural augmentation or alternative to the visualization interface, in situations in which the user needs very targeted information about the plan, in situations where natural language can express complex ideas more concisely than GUI actions, or in situations in which a graphical user interface is not appropriate.

  9. Flight Planning in the Cloud

    NASA Technical Reports Server (NTRS)

    Flores, Sarah L.; Chapman, Bruce D.; Tung, Waye W.; Zheng, Yang

    2011-01-01

    This new interface will enable Principal Investigators (PIs), as well as UAVSAR (Uninhabited Aerial Vehicle Synthetic Aperture Radar) members to do their own flight planning and time estimation without having to request flight lines through the science coordinator. It uses an all-in-one Google Maps interface, a JPL hosted database, and PI flight requirements to design an airborne flight plan. The application will enable users to see their own flight plan being constructed interactively through a map interface, and then the flight planning software will generate all the files necessary for the flight. Afterward, the UAVSAR team can then complete the flight request, including calendaring and supplying requisite flight request files in the expected format for processing by NASA s airborne science program. Some of the main features of the interface include drawing flight lines on the map, nudging them, adding them to the current flight plan, and reordering them. The user can also search and select takeoff, landing, and intermediate airports. As the flight plan is constructed, all of its components are constantly being saved to the database, and the estimated flight times are updated. Another feature is the ability to import flight lines from previously saved flight plans. One of the main motivations was to make this Web application as simple and intuitive as possible, while also being dynamic and robust. This Web application can easily be extended to support other airborne instruments.

  10. A Tasteful Collection.

    ERIC Educational Resources Information Center

    Canadian Architect, 2003

    2003-01-01

    Describes the design of the Canadian Wine Library at the University of British Columbia, including the educational context and design goals. Includes information on the architects, manufacturers/suppliers, and construction team; a general building description; and commentary on the design. Also includes the floor plan and photographs. (EV)

  11. Design of internal support structures for an inflatable lunar habitat

    NASA Technical Reports Server (NTRS)

    Cameron, Elizabeth A.; Duston, John A.; Lee, David D.

    1990-01-01

    NASA has a long range goal of constructing a fully equipped, manned lunar outpost on the near side of the moon by the year 2015. The proposed outpost includes an inflatable lunar habitat to support crews during missions longer that 12 months. A design for the internal support structures of the inflatable habitat is presented. The design solution includes material selection, substructure design, assembly plan development, and concept scale model construction. Alternate designs and design solutions for each component of the design are discussed. Alternate materials include aluminum, titanium, and reinforced polymers. Vertical support alternates include column systems, truss systems, suspension systems, and lunar lander supports. Horizontal alternates include beams, trusses, floor/truss systems, and expandable trusses. Feasibility studies on each alternate showed that truss systems and expandable trusses were the most feasible candidates for conceptual design. The team based the designs on the properties of 7075 T73 aluminum. The substructure assembly plan, minimizes assembly time and allows crews to construct the habitat without the use of EVA suits. In addition to the design solutions, the report gives conclusions and recommendations for further study of the inflatable habitat design.

  12. Guidance on including ITS elements in transportation projects

    DOT National Transportation Integrated Search

    2001-01-01

    The purpose of this document is to provide guidance for including ITS equipment and technologies as part of traditional transportation construction or maintenance projects. This document is not intended to simplify the planning process, rather it is ...

  13. Optimization of the scheme for natural ecology planning of urban rivers based on ANP (analytic network process) model.

    PubMed

    Zhang, Yichuan; Wang, Jiangping

    2015-07-01

    Rivers serve as a highly valued component in ecosystem and urban infrastructures. River planning should follow basic principles of maintaining or reconstructing the natural landscape and ecological functions of rivers. Optimization of planning scheme is a prerequisite for successful construction of urban rivers. Therefore, relevant studies on optimization of scheme for natural ecology planning of rivers is crucial. In the present study, four planning schemes for Zhaodingpal River in Xinxiang City, Henan Province were included as the objects for optimization. Fourteen factors that influenced the natural ecology planning of urban rivers were selected from five aspects so as to establish the ANP model. The data processing was done using Super Decisions software. The results showed that important degree of scheme 3 was highest. A scientific, reasonable and accurate evaluation of schemes could be made by ANP method on natural ecology planning of urban rivers. This method could be used to provide references for sustainable development and construction of urban rivers. ANP method is also suitable for optimization of schemes for urban green space planning and design.

  14. SEA effectiveness for landscape and master planning: An investigation in Sardinia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    De Montis, Andrea, E-mail: andreadm@uniss.it; Ledda, Antonio, E-mail: antonioledda@gmail.com; Caschili, Simone, E-mail: s.caschili@ucl.ac.uk

    The Italian administrative bodies and planning agencies have embraced with mixed feedbacks the introduction of Strategic Environmental Assessment (SEA) through the European Directive 2001/42/EC. Concurrently, regional and local spatial planning practice have been characterized by a new approach inspired by landscape planning. The Italian region of Sardinia has been one of the pioneering administrative bodies in the Italian and European arena that has adopted landscape principles for the construction of its regional master plan (PPR, Piano Paesaggistico Regionale). Municipalities are now carrying out the review of their master plans to the PPR's prescriptions and indications. Against this background, the aimmore » of this paper is to assess the level of SEA implementation in the municipal master plans of Sardinia, six years after the approval of the PPR. Rooted in the SEA international literature we construct a modular and adaptable on-line survey for officers involved in the review of municipal master plans. The results show that many Sardinian municipalities have not reviewed their master plans to the PPR's regulations yet and only a few municipalities have started this review process according to the SEA procedure. - Highlights: • We study strategic environmental assessment (SEA) effectiveness on land use plans • Four SEA implementation key issues are drawn from international literature • Data collection has included an on-line survey with close and open questions • Results indicate that SEA has been poorly implemented in landscape and master plans • Weak aspects include planning alternatives, financial resources, and monitoring.« less

  15. Computer aided system engineering for space construction

    NASA Technical Reports Server (NTRS)

    Racheli, Ugo

    1989-01-01

    This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.

  16. Simulation-based modeling of building complexes construction management

    NASA Astrophysics Data System (ADS)

    Shepelev, Aleksandr; Severova, Galina; Potashova, Irina

    2018-03-01

    The study reported here examines the experience in the development and implementation of business simulation games based on network planning and management of high-rise construction. Appropriate network models of different types and levels of detail have been developed; a simulation model including 51 blocks (11 stages combined in 4 units) is proposed.

  17. Residential Construction. Technology Learning Activity. Teacher Edition. Technology Education Series.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This packet of technology learning activity (TLA) materials for residential construction for students in grades 6-10 consists of an instructor's section and student materials. The instructor's section contains background information, suggested activities, and a list of suggested resources. A lesson plan for the 10-day module includes assignments;…

  18. 77 FR 50085 - Rookery Bay, FL and Kachemak Bay, AK National Estuarine Research Reserve Management Plan Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... priority issues including climate change and harvested species, such as salmon and shellfish. The reserve... land use changes affecting freshwater inflow, loss of native biodiversity, lack of public awareness and... change events. Since the last management plan, the reserve has constructed additional exhibits and a...

  19. 75 FR 53735 - Environmental Impact Statement; Opportunity Corridor, City of Cleveland, Cuyahoga County, OH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... boulevard type roadway including a multi-lane urban arterial with curbs, an elevated landscape median, multi... alternatives have been born out of a previous planning study called the University Circle Access Boulevard. The.... (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction. The...

  20. 46 CFR 160.133-13 - Approval inspections and tests for prototype release mechanisms.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... as built, in triplicate. The plans must include the instructions for training and maintenance... for Lifeboats and Rescue Boats § 160.133-13 Approval inspections and tests for prototype release...) Conforms with the plans reviewed under § 160.133-9 of this subpart; (B) Is constructed by the methods and...

  1. Manpower Planning Criteria Manual, Construction Grants Section.

    ERIC Educational Resources Information Center

    Texas State Dept. of Water Resources, Austin.

    This document presents the material developed in conjunction with a project directed to test a methodology that a state water pollution control agency can use in determining its manpower and training needs. Included is a compilation of the manpower planning criteria used to relate numbers and types of personnel with deferred workloads. It also…

  2. 6. Photocopy from portfolio of measured drawings (Plans of Public ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photocopy from portfolio of measured drawings (Plans of Public Buildings in Course of Construction Under the Direction of the Secretary of the Treasury, Including the Specifications Thereof: Custom House, Post Office and Court Room (Wheeling, VA), 1855.) 1855 TITLE PAGE - U. S. Custom House, Market & Sixteenth Streets, Wheeling, Ohio County, WV

  3. 40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...

  4. 40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...

  5. 40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...

  6. Pre-Retirement Planning: A Necessary Dress Rehearsal.

    ERIC Educational Resources Information Center

    Newman, Mary Elizabeth

    Studies seem to indicate that preparation for retirement is the key to its success. Planning includes these basic ingredients: (1) maintaining regular health habits; (2) role flexibility--the retiree needs a healthy self image not bound to the self-as-worker; (3) activity that is constructive and personally meaningful; and (4) continuance of…

  7. PLANS & ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard. Also ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLANS & ELEVATIONS. United Engineering Company Ltd., Alameda Shipyard. Also includes door schedule and a small scale plot plan. No architect noted. Drawn by W.H.H. Plan no. 2-N-5 (U.E. Co. plan no. 10,523). Scale 1/8 inch to the foot. March 10, 1942, last revised 10/6/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76, item no. 22A. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Warehouse, 2900 Main Street, Alameda, Alameda County, CA

  8. [Perception and attitude of rural community to the construction of Asian elephant conservation corridors in Xishuangbanna].

    PubMed

    Li, Zheng-Ling; Chen, Ming-Yong; Wu, Zhao-Lu; Wang, Qian; Dong, Yong-Hua

    2009-06-01

    By using contingent valuation method (CVM), an investigation was made from November 2007 to March 2008 on the perception and attitude of 196 households in 5 villages within 2 planned Asian elephant conservation corridors in Xishuangbanna to the construction of the corridors. 80.61% of the interviewees conditionally supported the corridors construction. The main factors affecting the interviewees' support willingness included their education level, per capita income, and perceptions to Asian elephant protection, human-elephant relations, and corridor utilization patterns and its beneficiaries, among which, the interviewees' awareness of Asian elephant conservation, corridor utilization patterns, and corridor beneficiaries had strong influence on the support willingness, with the correlation coefficient being 0.231, 0.236, and -0.304, respectively. The rural community holding the land tenure played a key role in the corridors construction. To effectively design and planning the construction of biological conservation corridor, it is necessary to have a deep understanding on the perceptions and attitudes of rural community to the construction of the corridor and to obtain their support and participation for this construction.

  9. The Methodology of Interactive Parametric Modelling of Construction Site Facilities in BIM Environment

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana

    2014-11-01

    Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.

  10. Electrical Circuits and Water Analogies

    ERIC Educational Resources Information Center

    Smith, Frederick A.; Wilson, Jerry D.

    1974-01-01

    Briefly describes water analogies for electrical circuits and presents plans for the construction of apparatus to demonstrate these analogies. Demonstrations include series circuits, parallel circuits, and capacitors. (GS)

  11. Puzzling out the new Medicare. How plan sponsors can understand and use Medicare+Choice to benefit their members and themselves.

    PubMed

    Parahus, S

    1999-01-01

    This article will discuss issues confronting plan sponsors in light of new Medicare+Choice options, and ways of responding to those issues. It will include a section with highlights of the "new" Medicare, including a brief description of new terminology and general descriptions of the different types of "coordinated care plans" and other options, e.g., POS, PPO, HMO, FFS, PSO and MSA. Its principal focus, however, will be on ways that plan sponsors can respond to--and capitalize on--the changes in Medicare and offer retirees a broader array of benefits while at the same time increasing their control over plan costs. The article will introduce the idea of plan sponsors constructing a retiree "flexible benefits" program comprising Medicare+Choice options.

  12. User Charge Revenues for Wastewater Treatment Plants--Insufficient to Cover Operation and Maintenance.

    DTIC Science & Technology

    1981-12-02

    audits of construction grants, a review of user charge system adequacy, including a review of the adequacy of reserve accounts for replacing major...recommendation to incorporate, as part of existing operation and and maintenance inspections and closeout financial audits of construction grants, a...determination to be made in an audit is whether the facility was constructed in conformance with approved plans and specifications and whether it meets

  13. Modern Vernacular.

    ERIC Educational Resources Information Center

    Taggart, Jim

    2002-01-01

    Describes the design of the Nicola Valley Institute of Technology in British Columbia, including the educational context and design goals. Includes information on architects, consultants, and cost, as well as floor plans and photographs. Discusses how the design for this First Nations school blends aboriginal constructs and…

  14. High altitude mine waste remediation -- Implementation of the Idarado remedial action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hardy, A.J.; Redmond, J.V.; River, R.A.

    1999-07-01

    The Idarado Mine in Colorado's San Juan Mountains includes 11 tailing areas, numerous waste rock dumps, and a large number of underground openings connected by over 100 miles of raises and drifts. The tailings and mine wastes were generated from different mining and milling operations between 1975 and 1978. the Idarado Remedial Action Plan (RAP) was an innovative 5-year program developed for remediating the impacts of historic mining activities in the San Miguel River and Red Mountain Creek drainages. The challenges during implementation included seasonal access limitations due to the high altitude construction areas, high volumes of runoff during snowmore » melt, numerous abandoned underground openings and stopped-out veins, and high profile sites adjacent to busy jeep trails and a major ski resort town. Implementation of the RAP has included pioneering efforts in engineering design and construction of remedial measures. Innovative engineering designs included direct revegetation techniques for the stabilization of tailings piles, concrete cutoff walls and French drains to control subsurface flows, underground water controls that included pipelines, weeplines, and portal collection systems, and various underground structures to collect and divert subsurface flows often exceeding 2,000 gpm. Remote work locations have also required the use of innovative construction techniques such as heavy lift helicopters to move construction materials to mines above 10,000 feet. This paper describes the 5-year implementation program which has included over 1,000,000 cubic yards of tailing regrading, application of 5,000 tons of manure and 26,000 tons of limestone, and construction of over 10,000 feet of pipeline and approximately 45,000 feet of diversion channel.« less

  15. The library system of the DFVLR: Present status, planned reorganization, user possibilities

    NASA Technical Reports Server (NTRS)

    Sternemann, P.

    1985-01-01

    This paper gives an overview of the present status, planned alterations, and the scope of users of the DFVLR library, as well as a survey of library related activities outside of the library department. Attention is given to the tasks of the DFVLR which include research, assistance in planning and carrying out projects, and the construction and operation of large test installations, showing how they relate to demands on the library.

  16. London 2012: occupational health in the construction programme.

    PubMed

    Waterman, Lawrence

    2007-05-01

    This article explores the approach to occupational health in the UK construction industry in both broad and narrow contexts. The construction programme for the 2012 Olympic Games and Paralympic Games includes the creation of a large urban park in east London containing many sports venues and served by enhanced infrastructure. The Olympic Delivery Authority (ODA), responsible for the construction programme, is developing plans that seek to assure the health of the thousands of workers who will be engaged in this work. Such plans are not being drafted in a vacuum. In addition to considerable consultation with stakeholders the ODA is also drawing on some of the exciting work that has been undertaken in occupational health in recent years. In particular, the move from a focus on technical health services provided by 'experts' to an acceptance that health issues should be managed within employing organizations. Understanding this broad context provides a solid basis for analysing the specific proposals for occupational support during the Olympic Park construction.

  17. Manual of Regulations and Recommendations for School Building Planning and Construction.

    ERIC Educational Resources Information Center

    Engelking, D. F.

    Recommendations and suggestions, as well as statutory provisions and state board regulations, are presented regarding school building construction in Idaho. The material is organized into the following sections--(1) school building planning, (2) the school site, (3) construction planning and requirements, (4) secondary school planning, (5)…

  18. Research on the Intensity Analysis and Result Visualization of Construction Land in Urban Planning

    NASA Astrophysics Data System (ADS)

    Cui, J.; Dong, B.; Li, J.; Li, L.

    2017-09-01

    As a fundamental work of urban planning, the intensity analysis of construction land involves many repetitive data processing works that are prone to cause errors or data precision loss, and the lack of efficient methods and tools to visualizing the analysis results in current urban planning. In the research a portable tool is developed by using the Model Builder technique embedded in ArcGIS to provide automatic data processing and rapid result visualization for the works. A series of basic modules provided by ArcGIS are linked together to shape a whole data processing chain in the tool. Once the required data is imported, the analysis results and related maps and graphs including the intensity values and zoning map, the skyline analysis map etc. are produced automatically. Finally the tool is installation-free and can be dispatched quickly between planning teams.

  19. Unitary Plan Wind Tunnel Landmark Dedication and Revitalization

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This video shows construction scenes of unitary plan wind tunnel, aerials, and views of various models, including an MD-II in the 11 ft, an Apollo in the 8x7, Dynasoar in the 8x7, a one inch scale shuttle in the 8x7, and an artist's concept of a 12 ft test section.

  20. Gender Differences in College Leisure Time Physical Activity: Application of the Theory of Planned Behavior and Integrated Behavioral Model

    ERIC Educational Resources Information Center

    Beville, Jill M.; Umstattd Meyer, M. Renée; Usdan, Stuart L.; Turner, Lori W.; Jackson, John C.; Lian, Brad E.

    2014-01-01

    Objective: National data consistently report that males participate in leisure time physical activity (LTPA) at higher rates than females. This study expanded previous research to examine gender differences in LTPA of college students using the theory of planned behavior (TPB) by including 2 additional constructs, descriptive norm and…

  1. Co-Instructing at the Secondary Level: Strategies for Success

    ERIC Educational Resources Information Center

    Rice, Nancy; Drame, Elizabeth; Owens, Laura; Frattura, Elise M.

    2007-01-01

    Much has been written about collaboration and co-teaching in secondary settings, including the importance of understanding one's partner's teaching approach; determining readiness to co-teach; clarifying roles, responsibilities, and expectations; scheduling shared planning time; and effective communication, including constructive dialogue and…

  2. Developing a Master Plan for Your School. School Buildings Planning, Design, and Construction Series No. 1.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on how to set up a master planning team and establish a plan for quickly completing the building process. It provides an overview of…

  3. 46 CFR 110.25-1 - Plans and information required for new construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Plans and information required for new construction. 110.25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction...

  4. 46 CFR 110.25-1 - Plans and information required for new construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Plans and information required for new construction. 110.25-1 Section 110.25-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Plan Submittal § 110.25-1 Plans and information required for new construction...

  5. 23 CFR 772.19 - Construction noise.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... during the project development studies. (b) Determine the measures which are needed in the plans and... shall include a weighing of the benefits achieved and the overall adverse social, economic and...

  6. 23 CFR 772.19 - Construction noise.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... during the project development studies. (b) Determine the measures which are needed in the plans and... shall include a weighing of the benefits achieved and the overall adverse social, economic and...

  7. How-To-Do-It

    ERIC Educational Resources Information Center

    American Biology Teacher, 1976

    1976-01-01

    Presented are four how-to-do-it projects including: an environmental education museum, developing chick embryos in plastic bags, construction of an arthropod holding device, and safety planning for beach field trips. (SL)

  8. The Economics of Remote Sensing for Planning and Construction

    ERIC Educational Resources Information Center

    Rottweiler, Kurt A.; Wilson, Jerry C.

    1971-01-01

    Discusses the latest in remote sensing technology including multispectral scanners, thermal scanners, aero magnetometers and side looking radar. Describes the application of this technology to preconstruction site surveys. (JF)

  9. 38 CFR 36.4367 - Requirement of construction warranty.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... property has been completed in substantial conformity with the plans and specifications upon which the Secretary based the valuation of the property, including any modifications thereof, or changes or variations...

  10. Standard guide for developing a cost-effective risk mitigation plan for new and existing constructed facilities

    Treesearch

    Jeffrey Prestemon

    2011-01-01

    Protecting constructed facilities from damages from natural and man-made hazards in a costeffective manner is a challenging task. Several measures of economic performance are available for evaluating building-related investments. These measures include, but are not limited to, life-cycle cost, present value net savings, savings-to-investment ratio, and adjusted...

  11. 7. Photographic copy of construction drawing 1976 (original drawing located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photographic copy of construction drawing 1976 (original drawing located in Building 301, Offutt AFB, Bellevue, Nebraska). Elevations of entire building exterior. Includes elevation, plan and details of the addition's interior stairs. - Offutt Air Force Base, Looking Glass Airborne Command Post, Aerospace Ground Equipment (AGE) Storage Facility, Far Northwest end of Project Looking Glass Historic District, Bellevue, Sarpy County, NE

  12. Library Services and Construction Act (LSCA). Texas State-Administered Annual Program FY 1993.

    ERIC Educational Resources Information Center

    Texas State Library, Austin. Dept. of Library Development.

    The documentation required under the Federal Library Services and Construction Act for the 1993 annual program of the Texas State Library is assembled. Under Title I, Public Library Services to Areas Without Services, the state plans total expenditures of $12,066,877, including $5,019,151 in federal funds and $7,047,726 in state funds for services…

  13. Guides in Construction and Manufacturing for Elementary School Industrial Arts. K-2; 3-4; 5-6.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus.

    This series of three guides was developed by 25 participants in the institute. One hundred and eight industrial arts lesson plans for grades K-6 are included in these guides for construction and for manufacturing intended to reflect the contemporary industrial and technological society in which young children live. Some typical construction…

  14. Space Construction Experiment Definition Study (SCEDS), part 2. Volume 2: Study results

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Space Construction Experiment (SCE) was defined for integration into the Space Shuttle. This included development of flight assignment data, revision and update of preliminary mission timelines and test plans, analysis of flight safety issues, and definition of ground operations scenarios. New requirements for the flight experiment and changes for a large space antenna feed mask test article were incorporated. The program plan and cost estimates were updated. Revised SCE structural dynamics characteristics were provided for simulation and analysis of experimental tests to define and verify control limits and interactions effects between the SCE and the Orbiter digital automatic pilot.

  15. Recommended Financial Plan for the Construction of a Permanent Campus for San Joaquin Delta College.

    ERIC Educational Resources Information Center

    Bortolazzo, Julio L.

    The financial plan for the San Joaquin Delta College (California) permanent campus is presented in a table showing the gross square footage, the unit cost (including such fixed equipment as workbenches, laboratory tables, etc.), and the estimated total cost for each department. The unit costs per square foot vary from $18.00 for warehousing to…

  16. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  17. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  18. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  19. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  20. 23 CFR Appendix G to Subpart A of... - Special Reporting Requirements for “Hometown” or “Imposed” Plan Areas

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Special Reporting Requirements for âHometownâ or âImposedâ Plan Areas G Appendix G to Subpart A of Part 230 Highways FEDERAL HIGHWAY ADMINISTRATION... Federal-Aid Construction Contracts (Including Supportive Services) Pt. 230, Subpt. A, App. G Appendix G to...

  1. Revised Class IV Planning Factors

    DTIC Science & Technology

    1997-01-01

    including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the...1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. 1. AGENCY...October 1996 meeting. 14. SUBJECT TERMS 15. NUMBER OF PAGES supply management mobilization 26 planning factors 16. PRICE CODE construction materials 17

  2. A Theory of Planned Behavior Research Model for Predicting the Sleep Intentions and Behaviors of Undergraduate College Students

    ERIC Educational Resources Information Center

    Knowlden, Adam P.; Sharma, Manoj; Bernard, Amy L.

    2012-01-01

    The purpose of this study was to operationalize the constructs of the Theory of Planned Behavior (TPB) to predict the sleep intentions and behaviors of undergraduate college students attending a Midwestern University. Data collection spanned three phases. The first phase included a semi-structured qualitative interview (n = 11), readability by…

  3. Activities for Teaching Solar Energy.

    ERIC Educational Resources Information Center

    Mason, Jack Lee; Cantrell, Joseph S.

    1980-01-01

    Plans and activities are suggested for teaching elementary children about solar energy. Directions are included for constructing a flat plate collector and a solar oven. Activities for a solar field day are given. (SA)

  4. 29 CFR 1926.12 - Reorganization Plan No. 14 of 1950.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for Impacted Areas—Section 1748h-2 provides mortgage insurance on single family or multifamily housing... construction of a parking facility, including necessary approaches and ramps. (49) Juvenile Delinquency...

  5. 44 CFR 60.23 - Planning considerations for mudslide (i.e., mudflow)-prone areas.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... open space; (d) The means of adjusting to the hazard, including the (1) establishment by ordinance of site exploration, investigation, design, grading, construction, filing, compacting, foundation...

  6. 44 CFR 60.23 - Planning considerations for mudslide (i.e., mudflow)-prone areas.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... open space; (d) The means of adjusting to the hazard, including the (1) establishment by ordinance of site exploration, investigation, design, grading, construction, filing, compacting, foundation...

  7. 44 CFR 60.23 - Planning considerations for mudslide (i.e., mudflow)-prone areas.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... open space; (d) The means of adjusting to the hazard, including the (1) establishment by ordinance of site exploration, investigation, design, grading, construction, filing, compacting, foundation...

  8. 44 CFR 60.23 - Planning considerations for mudslide (i.e., mudflow)-prone areas.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... open space; (d) The means of adjusting to the hazard, including the (1) establishment by ordinance of site exploration, investigation, design, grading, construction, filing, compacting, foundation...

  9. 44 CFR 60.23 - Planning considerations for mudslide (i.e., mudflow)-prone areas.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... open space; (d) The means of adjusting to the hazard, including the (1) establishment by ordinance of site exploration, investigation, design, grading, construction, filing, compacting, foundation...

  10. 7 CFR 1942.9 - Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... §§ 1942.17(p) and 1942.18] 1942.9 Section 1942.9 Agriculture Regulations of the Department of...) ASSOCIATIONS Community Facility Loans § 1942.9 Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18] (a) Review of construction plans and specifications. All plans and specifications...

  11. 7 CFR 1942.9 - Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18] 1942.9 Section 1942.9 Agriculture Regulations of the Department of....17(p) and 1942.18] (a) Review of construction plans and specifications. All plans and specifications...

  12. 7 CFR 1942.9 - Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18] 1942.9 Section 1942.9 Agriculture Regulations of the Department of....17(p) and 1942.18] (a) Review of construction plans and specifications. All plans and specifications...

  13. The planning, construction, and operation of a radioactive waste storage facility for an Australian state radiation regulatory authority

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wallace, J.D.; Kleinschmidt, R.; Veevers, P.

    1995-12-31

    Radiation regulatory authorities have a responsibility for the management of radioactive waste. This, more often than not, includes the collection and safe storage of radioactive sources in disused radiation devices and devices seized by the regulatory authority following an accident, abandonment or unauthorised use. The public aversion to all things radioactive, regardless of the safety controls, together with the Not In My Back Yard (NIMBY) syndrome combine to make the establishment of a radioactive materials store a near impossible task, despite the fact that such a facility is a fundamental tool for regulatory authorities to provide for the radiation safetymore » of the public. In Queensland the successful completion and operational use of such a storage facility has taken a total of 8 years of concerted effort by the staff of the regulatory authority, the expenditure of over $2 million (AUS) not including regulatory staff costs and the cost of construction of an earlier separate facility. This paper is a summary of the major developments in the planning, construction and eventual operation of the facility including technical and administrative details, together with the lessons learned from the perspective of the overall project.« less

  14. New Directions in School Furnishings.

    ERIC Educational Resources Information Center

    Roskos, Bob

    2003-01-01

    Describes trends in school furniture design, including emphasis on ergonomics, mobility, accommodation of technology, and the use of private sector providers to plan and implement the furniture, fixtures, and equipment portion of school construction budgets. (EV)

  15. 75 FR 48628 - Approval and Promulgation of Implementation Plans; State of Nebraska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... compounds; clarify language and incorporate rules related to construction permits to incorporate application... clarify language related to open fires and explicitly include an exemption for fires used for religious...

  16. Study on the methods of rational analysis about the area of the Planning of Sea Usage of Regional Construction

    NASA Astrophysics Data System (ADS)

    Ya-Juan, Li; Tian-Yu, Mao; Mingjing-Tian

    2018-03-01

    The Planning of Sea Usage of Regional Construction is a new area, and the rational analysis about the area of which is one of its difficulties. Based on “Urban land classification and land use planning and construction standards”, the land use control index method study the rationality of the sea usage area of the whole region, by accumulating for specific land use indicators for each land type within the planning area. This paper, takeing the project named “caofeidian integrated service area” for example, make a little study on the land use control index method used by the sea usage demonstration of the planning of sea usage of regional construction. The study will be good for improving the technical methods of rational analysis about the area of the planning of sea usage of regional construction.

  17. 7 CFR 3560.71 - Construction financing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Construction financing. 3560.71 Section 3560.71... Construction financing. (a) Construction financing plan. Prior to loan approval, applicants must submit to the Agency for its concurrence a plan for the construction financing and securing of the loan. (b) Interim...

  18. 7 CFR 3560.71 - Construction financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Construction financing. 3560.71 Section 3560.71... Construction financing. (a) Construction financing plan. Prior to loan approval, applicants must submit to the Agency for its concurrence a plan for the construction financing and securing of the loan. (b) Interim...

  19. 7 CFR 3560.71 - Construction financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Construction financing. 3560.71 Section 3560.71... Construction financing. (a) Construction financing plan. Prior to loan approval, applicants must submit to the Agency for its concurrence a plan for the construction financing and securing of the loan. (b) Interim...

  20. Annotated Bibliography for Water Quality Management, Fifth Edition.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    The references included in this bibliography have been selected by the Environmental Protection Agency for their applicability to 208 planning and for their availability. Each reference is followed by a short abstract and when possible by detailed price and ordering information. Topic areas include: agriculture, construction, economics, impact…

  1. 46 CFR 189.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of the alarm and extinguishing systems, the fire extinguishers, means of access to different... dampers and the number identifying each system. (2) Ventilation diagram including dampers and other fire control features. (3) Details of alarm systems. (4) Details of extinguishing systems, including fire mains...

  2. High-Rise Construction in Densely Dwelled Cities: Requirements for Premises Insolation and Consequences of their Violation in Russian Law and Jurisprudence

    NASA Astrophysics Data System (ADS)

    Gongalo, Boris; Gudovicheva, Lubov; Gubareva, Anna; Dobrynina, Larisa

    2018-03-01

    The issues of constructing high-rise, primarily residential, buildings have a great social significance. Not every plot of land, acquired in the Russian Federation is suitable for high-rise construction. Therefore, every construction company that plans to erect a multi-apartment building, a high-rise office building, or a skyscraper must take into account not only technical norms but as well sanitary legislation regulations that set obligatory requirements about insolation of apartments. The article includes a short study of several norms in the Russian legislation regarding insolation of dwellings; analises the problems of judicial interpretation of the statutory limitations. In this aspect it researches the debatable questions arising in practice of state arbitration courts dealing with the lawsuits on allocation of land-plots by the local administration. The analysis of the judicial practice is followed by description of the difficulties facing the developers of land-plots, concerning the project and territorial planning documentation.

  3. 77 FR 18990 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... reviewing and acting on specific air quality construction permit applications received by the New Mexico... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... replace existing rules, and revisions to the applicable State Implementation Plan (SIP) for New Mexico...

  4. Planning Construction Research of Modern Urban Landscape

    NASA Astrophysics Data System (ADS)

    Xiao, Z. Q.; Chen, W.

    With the development and expansion of the city's traditional urban landscape planning methods have been difficult to adapt to the requirements of modern urban development, in the new urban construction, planning what kind of urban landscape is a new research topic. The article discusses the principles of modern urban landscape planning and development, promote the adoption of new concepts and theories, building more regional characteristics, more humane, more perfect, more emphasis on urban landscape pattern natural ecological protection and construction can sustainable development of urban living environment, and promote the development and construction of the city.

  5. Planning and design considerations in karst terrain

    NASA Astrophysics Data System (ADS)

    Fischer, J. A.; Greene, R. W.; Ottoson, R. S.; Graham, T. C.

    1988-10-01

    This article discusses the various steps that the authors feel are necessary to the successful progression of an engineered project sited in karst terrain. The procedures require a multidisciplined approach with liaison and cooperation among the various parties to the project. Initially, the prospective owner must have sufficient understanding of the potential engineering problems to incorporate the engineering geologist into the early stages of any planned acquisition. The first step in an investigation should include a review of the available geologic information, aerial photo interpretation, consultation with the State Geological Survey, and a geologic reconnaissance of the prospective site and surrounding area. A go-no-go decision as to purchase can often been made at an early time. Although, in some instances, more study is needed for a particularly intriguing property. The second stage should consider the various planning alternatives that are feasible based upon the limited available information. At this stage planning/purchase decisions can be made as to purchasing options, value of the property, design constraints, and the possible economic penalties that could be associated with the potential site construction. Various planning and construction alternatives should be considered in this phase of the work. The third stage should include a site investigation program of moderate size, consisting of test pits and/or exploratory borings. The borings should be drilled using water as the drilling fluid, with an experienced crew and qualified technical inspection. The authors find the use of geophysical techniques can be extremely misleading unless used in conjunction with exploratory drilling. Successful evaluations using geophysical procedures occur only under ideal conditions. The geotechnical viability of the plan and preliminary design should be investigated in the fourth phase. Additionally, the physical parameters required for the design of structures founded atop cavities can be obtained at this time. Several support schemes which incorporate cavity roof thickness, rock strength, and cavity space are discussed. Possible construction procedures include excavation and dental concrete, grouting, piers or piles to sound rock, or moving to another area. The relative economies of these procedures are discussed in relation to the size and depth of the soil or rock cavity, possible future cavity formation, magnitude of loading and acceptable safety factors.

  6. Space Shuttle astrodynamical constants

    NASA Technical Reports Server (NTRS)

    Cockrell, B. F.; Williamson, B.

    1978-01-01

    Basic space shuttle astrodynamic constants are reported for use in mission planning and construction of ground and onboard software input loads. The data included here are provided to facilitate the use of consistent numerical values throughout the project.

  7. Risk management technique for liquefied natural gas facilities

    NASA Technical Reports Server (NTRS)

    Fedor, O. H.; Parsons, W. N.

    1975-01-01

    Checklists have been compiled for planning, design, construction, startup and debugging, and operation of liquefied natural gas facilities. Lists include references to pertinent safety regulations. Methods described are applicable to handling of other hazardous materials.

  8. 7 CFR 1717.154 - Transitional assistance in connection with new loans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to finance equipment and facilities included in a RUS approved construction work plan or amendment if... requests for this longer reimbursement period, RUS will consider the stresses that the transaction and...

  9. 7 CFR 1717.154 - Transitional assistance in connection with new loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... to finance equipment and facilities included in a RUS approved construction work plan or amendment if... requests for this longer reimbursement period, RUS will consider the stresses that the transaction and...

  10. Trimble Use Case Information : A Presentation to DOT Adjacent Band Compatibility Workshop #2

    DOT National Transportation Integrated Search

    2014-12-04

    Trimble Use Case Overview: Heavy Civil Construction - Planning, Designing, Building and Operating: Enhanced information, decision making and control across the entire project lifecycle, generating benefits including: - Faster Completion - Reduced Fue...

  11. The invisibility of fisheries in the process of hydropower development across the Amazon.

    PubMed

    Doria, Carolina Rodrigues da Costa; Athayde, Simone; Marques, Elineide E; Lima, Maria Alice Leite; Dutka-Gianelli, Jynessa; Ruffino, Mauro Luis; Kaplan, David; Freitas, Carlos E C; Isaac, Victoria N

    2018-05-01

    We analyze the invisibility of fisheries and inadequacy of fishers' participation in the process of hydropower development in the Amazon, focusing on gaps between legally mandated and actual outcomes. Using Ostrom's institutional design principles for assessing common-pool resource management, we selected five case studies from Brazilian Amazonian watersheds to conduct an exploratory comparative case-study analysis. We identify similar problems across basins, including deficiencies in the dam licensing process; critical data gaps; inadequate stakeholder participation; violation of human rights; neglect of fishers' knowledge; lack of organization and representation by fishers' groups; and lack of governmental structure and capacity to manage dam construction activities or support fishers after dam construction. Fishers have generally been marginalized or excluded from decision-making regarding planning, construction, mitigation, compensation, and monitoring of the social-ecological impacts of hydroelectric dams. Addressing these deficiencies will require concerted investments and efforts by dam developers, government agencies and civil society, and the promotion of inter-sectorial dialogue and cross-scale participatory planning and decision-making that includes fishers and their associations.

  12. FRX-L Research Status and Plans

    NASA Astrophysics Data System (ADS)

    Wurden, G. A.; Intrator, T. P.; Taccetti, J. M.; Furno, I. G.; Hsu, S. C.; Zhang, S. Y.; Degnan, J. H.; Grabowski, C.; Ruden, E. L.

    2003-10-01

    Our research plans for FRX-L, the field reversed configuration plasma injector at LANL for magnetized target fusion (MTF), have been planned for the next 4-year period. FRX-L has been successfully operating now for the last two years, although construction for both the machine and diagnostic sets is ongoing. Efforts in FY04 begin with continued improvements in the basic high density FRC parameters, through operation at increased magnetic fields and with the addition of a more effective main bank crowbar to reduce parasitic ringing in the high current main coil circuit. Translation experiments into a "fake" metal liner, perforated with diagnostic access ports, will start after designing and constructing the translation section. Another bank of capacitors will be added to power the additional guide and mirror coils. After demonstrating trapping of the plasma in the aluminum liner, and diagnosing sufficient plasma parameters (density, temperature, lifetime, purity), we will begin preparations for the integrated plasma/liner compression experiment at the Air Force Research Laboratory Shiva-Star machine in FY05. Construction of the new hardware will continue during FY06, and the first fusion-relevant demonstration of compression of plasma by an imploding metal liner is planned for FY07. Our MTF plans also include new initiatives with U of Washington, U of Wisconsin, and the University of New Mexico, in addition to ongoing theory ties to LLNL and GA.

  13. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  14. 4D modeling in high-rise construction

    NASA Astrophysics Data System (ADS)

    Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly

    2018-03-01

    High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  15. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    NASA Astrophysics Data System (ADS)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  16. STUDY ON THE REDUCTION MEASURES OF ENVIRONMENTAL LOADS AT THE DESIGNING AND CONSTRUCTION STAGES OF THE RIVER WORKS

    NASA Astrophysics Data System (ADS)

    Ikeda, Tetsuya; Amano, Kunihiko; Kishida, Hiroyuki

    In the field of infrastructure construction including river works, construction materials such as concrete are used, and it needs to transport them for the long distance. Due to recent growth of public awareness on the environmental issues, it becomes more important to estimate and reduce the environmental loads brought by the infrastructure construction. In the infrastructure construction, it is necessary to take notice of carbon dioxide and waste materials as the broad-based and long-range environmental loads. On the other hand, it is necessary to conduct the quantitative evaluation on these environmental loads and to investigate the reduction measures by considering the actual situation of construction. Focusing on the river works, this paper estimates the cost of construction, the carbon dioxide emission and final disposal volume on the several alternative plans at the designing stage, compares the significance of different environmental loads by using the integrated factors of LIME2, and analyzes the effectiveness of reduction measures. It also establishes the reduction scenarios of the environmental loads, and analyzes the effectiveness compared to the base-line scenario in which the materials are newly extracted and produced. Based on the results, it establishes the procedure intending to reduce the environmental loads at the time of river planning and construction, which will be referentialized by river managers, construction consultants and constructors nationwide.

  17. 46 CFR 126.330 - Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Plans. 126.330 Section 126.330 Shipping COAST GUARD... Inspection § 126.330 Plans. Before construction starts, the owner, operator, or builder shall develop plans indicating the proposed arrangement and construction of the vessel. (The list of plans to be developed and...

  18. Design verification tests for an axial gap permanent magnet compressor motor

    NASA Astrophysics Data System (ADS)

    Hawsey, R. A.; Bailey, J. M.

    1987-07-01

    A 30-hp, direct-drive, permanent magnet motor (PMM) has been constructed. The motor is to operate at 15,000 rpm and is designed to drive a Worthington compressor at the US DOE-owned gaseous diffusion plants. The PMM prevents traditional dynamometer testing, including locked rotor current, voltage, and torque measurements. A test plan is presented for data acquisition on the dynamometer test stand in order to calculate the equivalent circuit for the motor. A description of the hardware required for these measurements is included in the plan.

  19. The Lister Hill National Center for Biomedical Communications.

    PubMed

    Smith, K A

    1994-09-01

    On August 3, 1968, the Joint Resolution of the Congress established the program and construction of the Lister Hill National Center for Biomedical Communications. The facility dedicated in 1980 contains the latest in computer and communications technologies. The history, program requirements, construction management, and general planning are discussed including technical issues regarding cabling, systems functions, heating, ventilation, and air conditioning system (HVAC), fire suppression, research and development laboratories, among others.

  20. Predicting sugar-sweetened behaviours with theory of planned behaviour constructs: Outcome and process results from the SIPsmartER behavioural intervention.

    PubMed

    Zoellner, Jamie M; Porter, Kathleen J; Chen, Yvonnes; Hedrick, Valisa E; You, Wen; Hickman, Maja; Estabrooks, Paul A

    2017-05-01

    Guided by the theory of planned behaviour (TPB) and health literacy concepts, SIPsmartER is a six-month multicomponent intervention effective at improving SSB behaviours. Using SIPsmartER data, this study explores prediction of SSB behavioural intention (BI) and behaviour from TPB constructs using: (1) cross-sectional and prospective models and (2) 11 single-item assessments from interactive voice response (IVR) technology. Quasi-experimental design, including pre- and post-outcome data and repeated-measures process data of 155 intervention participants. Validated multi-item TPB measures, single-item TPB measures, and self-reported SSB behaviours. Hypothesised relationships were investigated using correlation and multiple regression models. TPB constructs explained 32% of the variance cross sectionally and 20% prospectively in BI; and explained 13-20% of variance cross sectionally and 6% prospectively. Single-item scale models were significant, yet explained less variance. All IVR models predicting BI (average 21%, range 6-38%) and behaviour (average 30%, range 6-55%) were significant. Findings are interpreted in the context of other cross-sectional, prospective and experimental TPB health and dietary studies. Findings advance experimental application of the TPB, including understanding constructs at outcome and process time points and applying theory in all intervention development, implementation and evaluation phases.

  1. Research on Computer Aided Innovation Model of Weapon Equipment Requirement Demonstration

    NASA Astrophysics Data System (ADS)

    Li, Yong; Guo, Qisheng; Wang, Rui; Li, Liang

    Firstly, in order to overcome the shortcoming of using only AD or TRIZ solely, and solve the problems currently existed in weapon equipment requirement demonstration, the paper construct the method system of weapon equipment requirement demonstration combining QFD, AD, TRIZ, FA. Then, we construct a CAI model frame of weapon equipment requirement demonstration, which include requirement decomposed model, requirement mapping model and requirement plan optimization model. Finally, we construct the computer aided innovation model of weapon equipment requirement demonstration, and developed CAI software of equipment requirement demonstration.

  2. Status of the FLARE (Facility for Laboratory Reconnection Experiments) Construction Project and Plans as a User Facility

    NASA Astrophysics Data System (ADS)

    Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Chen, Y.; Cutler, R.; Fox, W.; Hoffmann, F.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.; Bale, S. D.; Carter, T.; Dorfman, S.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.

    2016-10-01

    The FLARE device (flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton for the studies of magnetic reconnection in the multiple X-line regimes directly relevant to space, solar, astrophysical, and fusion plasmas, as guided by a reconnection phase diagram [Ji & Daughton, (2011)]. Most of major components either have been already fabricated or are near their completion, including the two most crucial magnets called flux cores. The hardware assembly and installation begin in this summer, followed by commissioning in 2017. Initial comprehensive set of research diagnostics will be constructed and installed also in 2017. The main diagnostics is an extensive set of magnetic probe arrays, covering multiple scales from local electron scales, to intermediate ion scales, and global MHD scales. The planned procedures and example topics as a user facility will be discussed.

  3. FIRE STATION AND GUARD HOUSE, PLANS AND DETAILS. Plan No. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRE STATION AND GUARD HOUSE, PLANS AND DETAILS. Plan No. 6754-319, dated August 1, 1933. Construction Division, Office of the Constructing Quartermaster - Hamilton Field, Fire Station & Guard House, Southwest corner of Seventh Street & Hangar Avenue, Novato, Marin County, CA

  4. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  5. 75 FR 73059 - Record of Decision and Floodplain Statement of Findings for the Cushman Hydroelectric Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... license to include inter alia conditions for fish passage facilities and authorization to construct the... originally opposed Tacoma's Cultural Resource Summary Report, and cultural resource protection became a... in the MOA. The MOA includes a Treatment Plan that Tacoma must follow to protect cultural resources...

  6. CAP: Construction Assistance Plan. Handbook for Construction Project Planning, Oregon Community Colleges.

    ERIC Educational Resources Information Center

    Duncan, Verne A.

    This handbook for construction project planning was developed to be used by the Oregon Department of Education to evaluate existing facilities and determine the projected needs for each of the community college districts. Each college district's eligibility for state participation in funding is based on a Basic Space Need (BSN) which is the square…

  7. 25 CFR 170.405 - Can tribal transportation planning funds be used for road construction and other projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can tribal transportation planning funds be used for road construction and other projects? 170.405 Section 170.405 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian...

  8. 25 CFR 170.404 - What happens when a tribe uses its IRR Program construction funds for transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens when a tribe uses its IRR Program construction funds for transportation planning? 170.404 Section 170.404 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction...

  9. Expert systems tools for Hubble Space Telescope observation scheduling

    NASA Technical Reports Server (NTRS)

    Miller, Glenn; Rosenthal, Don; Cohen, William; Johnston, Mark

    1987-01-01

    The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

  10. Construction Methods and Materials. School Buildings Planning, Design, and Construction Series No. 5.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on the various types of construction that may be used, the materials available, and some elementary aspects of the services required…

  11. Standard road plans [English version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed : to show standardized design features, construction methods and approved : materials to be used in design plans for Interstate, Primary, and Secondary : road construction in th...

  12. Standard road plans : metric [version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed : to show standardized design features, construction methods and approved : materials to be used in design plans for Interstate, Primary, and Secondary : road construction in th...

  13. 78 FR 54813 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...] Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit Program Fee Increases; Construction Permit Regulation of PM 2.5 ; Regulation 3 AGENCY: Environmental Protection Agency... construction permit processing fees. EPA proposes approval of Colorado's May 25, 2011 submittal, which...

  14. 24 CFR 583.330 - Applicability of other Federal requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMMUNITY FACILITIES SUPPORTIVE HOUSING PROGRAM Program Requirements § 583... the approval of applications for assistance for acquisition or construction (including rehabilitation...

  15. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  16. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  17. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  18. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  19. 40 CFR 35.905 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...

  20. 48 CFR 9.104-1 - General standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 9.104-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... them (including, as appropriate, such elements as production control procedures, property control... necessary production, construction, and technical equipment and facilities, or the ability to obtain them...

  1. 48 CFR 9.104-1 - General standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 9.104-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... them (including, as appropriate, such elements as production control procedures, property control... necessary production, construction, and technical equipment and facilities, or the ability to obtain them...

  2. 48 CFR 9.104-1 - General standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 9.104-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... them (including, as appropriate, such elements as production control procedures, property control... necessary production, construction, and technical equipment and facilities, or the ability to obtain them...

  3. 7 CFR 4288.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 12 months of data supported by engineering and design calculations, and site plans, prepared by the construction engineering firm. Biobased products. Products determined by the Secretary to be commercial or... biological products, including renewable domestic agricultural materials and forestry materials; or (2...

  4. 7 CFR 4288.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 12 months of data supported by engineering and design calculations, and site plans, prepared by the construction engineering firm. Biobased products. Products determined by the Secretary to be commercial or... biological products, including renewable domestic agricultural materials and forestry materials; or (2...

  5. 7 CFR 4288.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 12 months of data supported by engineering and design calculations, and site plans, prepared by the construction engineering firm. Biobased products. Products determined by the Secretary to be commercial or... biological products, including renewable domestic agricultural materials and forestry materials; or (2...

  6. Science Facilities Design Guidelines.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    These guidelines, presented in five chapters, propose a framework to support the planning, designing, constructing, and renovating of school science facilities. Some program issues to be considered in the articulation of a science program include environmental concerns, interdisciplinary approaches, space flexibility, and electronic…

  7. Integral stormwater management master plan and design in an ecological community.

    PubMed

    Che, Wu; Zhao, Yang; Yang, Zheng; Li, Junqi; Shi, Man

    2014-09-01

    Urban stormwater runoff nearly discharges directly into bodies of water through gray infrastructure in China, such as sewers, impermeable ditches, and pump stations. As urban flooding, water shortage, and other environment problems become serious, integrated water environment management is becoming increasingly complex and challenging. At more than 200ha, the Oriental Sun City community is a large retirement community located in the eastern side of Beijing. During the beginning of its construction, the project faced a series of serious water environment crises such as eutrophication, flood risk, water shortage, and high maintenance costs. To address these issues, an integral stormwater management master plan was developed based on the concept of low impact development (LID). A large number of LID and green stormwater infrastructure (GSI) approaches were designed and applied in the community to replace traditional stormwater drainage systems completely. These approaches mainly included bioretention (which captured nearly 85th percentile volume of the annual runoff in the site, nearly 5.4×10(5)m(3) annually), swales (which functioned as a substitute for traditional stormwater pipes), waterscapes, and stormwater wetlands. Finally, a stormwater system plan was proposed by integrating with the gray water system, landscape planning, an architectural master plan, and related consultations that supported the entire construction period. After more than 10 years of planning, designing, construction, and operation, Oriental Sun City has become one of the earliest modern large-scale LID communities in China. Moreover, the project not only addressed the crisis efficiently and effectively, but also yielded economic and ecological benefits. Copyright © 2014. Published by Elsevier B.V.

  8. 30 CFR 285.623-285.625 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Construction and Operations Plan for Commercial Leases §§ 285.623-285.625 [Reserved] Contents of the Construction and Operations Plan ...

  9. 20. Photographic copy of an asconstructed site plan for additions ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photographic copy of an as-constructed site plan for additions to North Base: Job No. A(8-1), Military Construction, Materiel Command Flight Test Base, Muroc, California; Additional Construction, Location Plan, Sheet No. 2, October 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  10. Architectural Drafting, Drafting 2: 9255.04.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course covers the basic fundamentals of architectural drafting and is not intended to delve into the more advanced phases of architecture. The student is presented with standards and procedures, and will become proficient in layout of floor plans, electrical plans, roof construction, foundation plans, typical wall construction, plot plans, and…

  11. Factors affecting construction performance: exploratory factor analysis

    NASA Astrophysics Data System (ADS)

    Soewin, E.; Chinda, T.

    2018-04-01

    The present work attempts to develop a multidimensional performance evaluation framework for a construction company by considering all relevant measures of performance. Based on the previous studies, this study hypothesizes nine key factors, with a total of 57 associated items. The hypothesized factors, with their associated items, are then used to develop questionnaire survey to gather data. The exploratory factor analysis (EFA) was applied to the collected data which gave rise 10 factors with 57 items affecting construction performance. The findings further reveal that the items constituting ten key performance factors (KPIs) namely; 1) Time, 2) Cost, 3) Quality, 4) Safety & Health, 5) Internal Stakeholder, 6) External Stakeholder, 7) Client Satisfaction, 8) Financial Performance, 9) Environment, and 10) Information, Technology & Innovation. The analysis helps to develop multi-dimensional performance evaluation framework for an effective measurement of the construction performance. The 10 key performance factors can be broadly categorized into economic aspect, social aspect, environmental aspect, and technology aspects. It is important to understand a multi-dimension performance evaluation framework by including all key factors affecting the construction performance of a company, so that the management level can effectively plan to implement an effective performance development plan to match with the mission and vision of the company.

  12. 58. Photographic copy of original construction plan (St. Paul Engineer's ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  13. MDOT implementation plan for GPS technology in planning, design, and construction delivery

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  14. Standard road plans index sheets [English version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed to show standardized design features, construction methods and approved materials to be used in design plans for Interstate, Primary, and Secondary road construction in the Stat...

  15. Standard road plans index sheets [metric version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed to show standardized design features, construction methods and approved materials to be used in design plans for Interstate, Primary, and Secondary road construction in the Stat...

  16. Intention to quit water pipe smoking among Arab Americans: Application of the theory of planned behavior.

    PubMed

    Athamneh, Liqa; Essien, E James; Sansgiry, Sujit S; Abughosh, Susan

    2017-01-01

    In this study, we examined the effect of theory of planned behavior (TPB) constructs on the intention to quit water pipe smoking by using an observational, survey-based, cross-sectional study design with a convenient sample of Arab American adults in Houston, Texas. Multivariate logistic regression models were used to determine predictors of intention to quit water pipe smoking in the next year. A total of 340 participants completed the survey. Behavioral evaluation, normative beliefs, and motivation to comply were significant predictors of an intention to quit water pipe smoking adjusting for age, gender, income, marital status, and education. Interventions and strategies that include these constructs will assist water pipe smokers in quitting.

  17. Impacts of Climate Variability and Change on Flood Frequency Analysis for Transportation Design

    DOT National Transportation Integrated Search

    2010-09-01

    Planning for construction of roads and bridges over rivers or floodplains includes a hydrologic analysis of rainfall amount and intensity : for a defined period. Infrastructure design must be based on accurate rainfall estimates how much (intensi...

  18. Laboratory Equipment Criteria.

    ERIC Educational Resources Information Center

    State Univ. Construction Fund, Albany, NY.

    Requirements for planning, designing, constructing and installing laboratory furniture are given in conjunction with establishing facility criteria for housing laboratory equipment. Furniture and equipment described include--(1) center tables, (2) reagent racks, (3) laboratory benches and their mechanical fixtures, (4) sink and work counters, (5)…

  19. Earthquake Hazard Mitigation Using a Systems Analysis Approach to Risk Assessment

    NASA Astrophysics Data System (ADS)

    Legg, M.; Eguchi, R. T.

    2015-12-01

    The earthquake hazard mitigation goal is to reduce losses due to severe natural events. The first step is to conduct a Seismic Risk Assessment consisting of 1) hazard estimation, 2) vulnerability analysis, 3) exposure compilation. Seismic hazards include ground deformation, shaking, and inundation. The hazard estimation may be probabilistic or deterministic. Probabilistic Seismic Hazard Assessment (PSHA) is generally applied to site-specific Risk assessments, but may involve large areas as in a National Seismic Hazard Mapping program. Deterministic hazard assessments are needed for geographically distributed exposure such as lifelines (infrastructure), but may be important for large communities. Vulnerability evaluation includes quantification of fragility for construction or components including personnel. Exposure represents the existing or planned construction, facilities, infrastructure, and population in the affected area. Risk (expected loss) is the product of the quantified hazard, vulnerability (damage algorithm), and exposure which may be used to prepare emergency response plans, retrofit existing construction, or use community planning to avoid hazards. The risk estimate provides data needed to acquire earthquake insurance to assist with effective recovery following a severe event. Earthquake Scenarios used in Deterministic Risk Assessments provide detailed information on where hazards may be most severe, what system components are most susceptible to failure, and to evaluate the combined effects of a severe earthquake to the whole system or community. Casualties (injuries and death) have been the primary factor in defining building codes for seismic-resistant construction. Economic losses may be equally significant factors that can influence proactive hazard mitigation. Large urban earthquakes may produce catastrophic losses due to a cascading of effects often missed in PSHA. Economic collapse may ensue if damaged workplaces, disruption of utilities, and resultant loss of income produces widespread default on payments. With increased computational power and more complete inventories of exposure, Monte Carlo methods may provide more accurate estimation of severe losses and the opportunity to increase resilience of vulnerable systems and communities.

  20. Urban Options Solar Greenhouse Demonstration Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  1. 15th Annual School Construction Report, 2010

    ERIC Educational Resources Information Center

    Abramson, Paul

    2010-01-01

    School construction in 2009 fell 16 percent from one year ago, to just $16.4 billion, the lowest annual total for school construction since 1998. Indications are that it will fall further this year. "School Planning & Management" received reports on school construction completed and underway during 2009 and planned to start in 2010…

  2. 40 CFR 49.152 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... trailers to house construction management or staff and contractor personnel. Commence construction means... materials, storing of equipment or setting up temporary trailers to house construction management or staff...: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...

  3. 7 CFR 1924.1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Construction and Other Development § 1924.1 Purpose. This... 103-354 policies, methods, and responsibilities in the planning and performing of construction and...

  4. INFINITY construction contract signed

    NASA Image and Video Library

    2010-04-06

    Key state and community leaders celebrated April 6 with the signing of a construction contract for the state-of-the-art INFINITY Science Center planned near John C. Stennis Space Center in south Mississippi. Gulfport Mayor George Schloegel (l to r), chair of non-profit INFINITY Science Center Inc., was joined for the signing ceremony at the Hancock Bank in Gulfport by Virginia Wagner, sister of late Hancock Bank President Leo Seal Jr.; and Roy Anderson III, president and CEO of Roy Anderson Corp. Seal was the first chair of INFINITY Science Center Inc., which has led in development of the project. Roy Anderson Corp. plans to begin construction on the 72,000-square-foot, $28 million science and education center in May. The Mississippi Department of Transportation (MDOT) also is set to begin construction of a $2 million access road to the new center. The April 6 ceremony was attended by numerous officials, including former Stennis Space Center Directors Jerry Hlass and Roy Estess; Mississippi Senate President Pro Tempore Billy Hewes, R-Gulfport; Mississippi Rep. Diane Peranich, D-Pass Christian; and MDOT Southern District Commissioner Wayne Brown.

  5. INFINITY construction contract signed

    NASA Technical Reports Server (NTRS)

    2010-01-01

    Key state and community leaders celebrated April 6 with the signing of a construction contract for the state-of-the-art INFINITY Science Center planned near John C. Stennis Space Center in south Mississippi. Gulfport Mayor George Schloegel (l to r), chair of non-profit INFINITY Science Center Inc., was joined for the signing ceremony at the Hancock Bank in Gulfport by Virginia Wagner, sister of late Hancock Bank President Leo Seal Jr.; and Roy Anderson III, president and CEO of Roy Anderson Corp. Seal was the first chair of INFINITY Science Center Inc., which has led in development of the project. Roy Anderson Corp. plans to begin construction on the 72,000-square-foot, $28 million science and education center in May. The Mississippi Department of Transportation (MDOT) also is set to begin construction of a $2 million access road to the new center. The April 6 ceremony was attended by numerous officials, including former Stennis Space Center Directors Jerry Hlass and Roy Estess; Mississippi Senate President Pro Tempore Billy Hewes, R-Gulfport; Mississippi Rep. Diane Peranich, D-Pass Christian; and MDOT Southern District Commissioner Wayne Brown.

  6. National Ignition Facility project acquisition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callaghan, R.W.

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertialmore » Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.« less

  7. Analysis of strategic plans to assess planning for sustainability of comprehensive community initiatives.

    PubMed

    Sridharan, Sanjeev; Go, Sodam; Zinzow, Heidi; Gray, Aracelis; Barrett, Melissa Gutierrez

    2007-02-01

    In order to achieve the intended impact on a community, comprehensive community initiatives must sustain programs once they have been implemented. However, planning for sustainability is challenging and is rarely incorporated in the planning process of an initiative. The current study examined 19 5-year plans developed during the planning phase of the Comprehensive Strategy for Serious, Violent and Chronic Juvenile Offenders. Quantitative and qualitative methods were employed to assess the extent to which the construct of sustainability was incorporated. The plan analysis was supplemented with results from other components of the complex evaluation design implemented as part of the process evaluation of Comprehensive Strategy. Results suggested that sustainability was not accounted for during the planning phase of this initiative. The implications of these findings, including the importance of planning for sustainability in order to achieve sustainability, are discussed.

  8. An evaluation of Mexican transportation planning, finance, implementation, and construction processes.

    DOT National Transportation Integrated Search

    2009-10-01

    This research examined the legal, financial, institutional and policy processes that Mexico uses to plan, finance, : construct, and implement its transportation network. It documents through twelve case studies the state of the : practice in planning...

  9. Determinants of fast-food consumption. An application of the Theory of Planned Behaviour.

    PubMed

    Dunn, Kirsten I; Mohr, Philip; Wilson, Carlene J; Wittert, Gary A

    2011-10-01

    This study applied and extended the Theory of Planned Behaviour (TPB; Ajzen, 1988) in an examination of the variables influencing fast-food consumption in an Australian sample. Four hundred and four participants responded to items measuring TPB constructs and retrospective and prospective measures of fast-food consumption. Additional independent variables included: Consideration of Future Consequences (Strathman, Gleicher, Boninger, & Edwards, 1994), Fear of Negative Evaluation (Leary, 1983), and Self-Identification as a Healthy Eater Scale (Armitage & Conner, 1999a). Structural Equation Modeling (SEM) was used to examine predictors of consumption. SEM indicated that the TPB successfully predicted fast-food consumption. Factor analyses assisted in the definition of constructs that underlay attitudes towards fast foods. These constructs were included in an 'extended' TPB model which then provided a richer source of information regarding the nature of the variables influencing fast-food consumption. Findings suggest that fast-food consumption is influenced by specific referent groups as well as a general demand for meals that are tasty, satisfying, and convenient. These factors reflect immediate needs and appear to override concerns about longer-term health risks associated with fast food. Results are discussed in the context of possible applications. Copyright © 2011 Elsevier Ltd. All rights reserved.

  10. 90. Photographic copy of plan of bins, section of boot, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    90. Photographic copy of plan of bins, section of boot, and photograph of construction originally published in Plans of Grain Elevators (Chicago; Grain Dealers Journal, 1918), p.53. PLAN OF BINS; SECTION OF BOOT; VIEW OF CONSTRUCTION LOOKING NORTHWEST - Northwestern Consolidated Elevator "A", 119 Fifth Avenue South, Minneapolis, Hennepin County, MN

  11. 46 CFR 71.20-10 - Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Plans. 71.20-10 Section 71.20-10 Shipping COAST GUARD... § 71.20-10 Plans. (a) Before application for inspection is made and before construction is started, the owner or builder shall have plans indicating the proposed arrangement and construction of the vessel...

  12. An examination of the misuse of prescription stimulants among college students using the theory of planned behavior.

    PubMed

    Gallucci, Andrew; Martin, Ryan; Beaujean, Alex; Usdan, Stuart

    2015-01-01

    The misuse of prescription stimulants (MPS) is an emergent adverse health behavior among undergraduate college students. However, current research on MPS is largely atheoretical. The purpose of this study was to validate a survey to assess MPS-related theory of planned behavior (TPB) constructs (i.e. attitudes, subjective norms, and perceived behavioral control) and determine the relationship between these constructs, MPS-related risk factors (e.g. gender and class status), and current MPS (i.e. past 30 days use) among college students. Participants (N = 978, 67.8% female and 82.9% Caucasian) at a large public university in the southeastern USA completed a survey assessing MPS and MPS-related TPB constructs during fall 2010. To examine the relationship between MPS-related TPB constructs and current MPS, we conducted (1) confirmatory factor analyses to validate that our survey items assessed MPS-related TPB constructs and (2) a series of regression analyses to examine associations between MPS-related TPB constructs, potential MPS-related risk factors, and MPS in this sample. Our factor analyses indicated that the survey items assessed MPS-related TPB constructs and our multivariate logistic regression analysis indicated that perceived behavioral control was significantly associated with current MPS. In addition, analyses found that having a prescription stimulant was a protective factor against MPS when the model included MPS-related TPB variables.

  13. Hierarchical Control and Trajectory Planning

    NASA Technical Reports Server (NTRS)

    Martin, Clyde F.; Horn, P. W.

    1994-01-01

    Most of the time on this project was spent on the trajectory planning problem. The construction is equivalent to the classical spline construction in the case that the system matrix is nilpotent. If the dimension of the system is n then the spline of degree 2n-1 is constructed. This gives a new approach to the construction of splines that is more efficient than the usual construction and at the same time allows the construction of a much larger class of splines. All known classes of splines are reconstructed using the approach of linear control theory. As a numerical analysis tool control theory gives a very good tool for constructing splines. However, for the purposes of trajectory planning it is quite another story. Enclosed in this document are four reports done under this grant.

  14. Eleventh Annual Report of Accomplishments Under the Airport Improvement Program

    DTIC Science & Technology

    1992-01-01

    552,860 INSTALL SECURITY SYSTEM PORTLAND INTERNATIONAL JETPORT (PRIMARY) 25 $255, 195 CONSTRUCT ACCESS ROAD PRESQUE ISLE 09 $988,548 CONSTRUCT AIRCRAFT...TAXIWAYS; INSTALL VISUAL APPROACH AIDS PENNSYLVANIA COMMONWEALTH OF PENNSYLVANIA S7 $89,050 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) DELAWARE...VALLEY REGION RA $195,030 CONDUCT STATE SYSTEM PLAN UPDATE (SYSTEM PLAN) SOUTHWESTERN PENNSYLVANIA REGION RA $310,950 CONDUCT REGIONAL SYSTEM PLAN

  15. MDOT implementation plan for global positioning systems (GPS) technology in planning, design, and construction delivery.

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  16. Inventory Control.

    ERIC Educational Resources Information Center

    Sievers, Dennis, Ed.

    1986-01-01

    Describes apparatus for use in high school chemistry instruction. Provides instructions and lists of materials needed for building a homemade sand bath for use in experiments that demonstrate the slow evaporation of a solvent. Plans for the construction of a low-cost conductivity apparatus are also included. (TW)

  17. 50 CFR 216.208 - Letters of Authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... species for subsistence uses; and (3) Requirements for monitoring and reporting, including any requirements for the independent peer-review of proposed monitoring plans. (c) Issuance and renewal of each... MAMMALS Taking of Marine Mammals Incidental to Construction and Operation of Offshore Oil and Gas...

  18. Guidelines for the design and evaluation of human factors aspects of automated guideway transit systems

    DOT National Transportation Integrated Search

    1979-03-01

    This report is a summary of human factors considerations for the planning, : deSign, construction, and implementation of Automated Guideway Transit (AGT) Systems : including Downtown People Mover (DPM) systems. Design concepts such as passenger : saf...

  19. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  20. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  1. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  2. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  3. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...

  4. The space telescope

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Papers concerning the development of the Space Telescope which were presented at the Twenty-first Annual Meeting of the American Astronautical Society in August, 1975 are included. Mission planning, telescope performance, optical detectors, mirror construction, pointing and control systems, data management, and maintenance of the telescope are discussed.

  5. Owl Pellets.

    ERIC Educational Resources Information Center

    Thompson, Craig D.

    1987-01-01

    Provides complete Project WILD lesson plans for 20-45-minute experiential science learning activity for grades 3-7 students. Describes how students construct a simple food chain through examination of owl pellets. Includes lesson objective, method, background information, materials, procedure, evaluation, and sources of owl pellets and posters.…

  6. 75 FR 52701 - Approval and Promulgation of Implementation Plans; State of Missouri

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ... information claimed to be Confidential Business Information (CBI) or other information whose disclosure is.... Ventilation Limits 5. Ongoing Ventilation Testing and Reporting Requirements 6. Winter Construction Work..., including building enclosure and ventilation projects, implementation of work practice standards, process...

  7. 24 CFR 941.606 - Proposal.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) Life cycle analysis. For new construction and substantial rehabilitation, the criteria to be used in equipping the proposed development with heating and cooling systems, which shall include a life-cycle cost... the proposed site, site plan, and neighborhood. (f) Market analysis. An analysis of the projected...

  8. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction.... (iii) A detailed description of sampling and monitoring procedures, including sampling and monitoring locations in the system, the equipment to be used, sampling and monitoring frequency, and planned analytical...

  9. Discussion on teaching reform of environmental planning and management

    NASA Astrophysics Data System (ADS)

    Zhang, Qiugen; Chen, Suhua; Xie, Yu; Wei, Li'an; Ding, Yuan

    2018-05-01

    The curriculum of environmental planning and management is an environmental engineering major curriculum established by the teaching steering committee of environmental science and engineering of Education Ministry, which is the core curriculum of Chinese engineering education professional certification. It plays an important role in cultivating environmental planning and environmental management ability of environmental engineering major. The selection and optimization of the course teaching content of environmental planning and management were discussed which including curriculum teaching content updating and optimizing and teaching resource system construction. The comprehensive application of teaching method was discussed which including teaching method synthesis and teaching method. The final combination of the assessment method was also discussed which including the formative assessment normal grades and the final result of the course examination. Through the curriculum comprehensive teaching reform, students' knowledge had been broadened, the subject status and autonomy of learning had been enhanced, students' learning interest had been motivated, the ability of students' finding, analyzing and solving problems had been improved. Students' innovative ability and positive spirit had been well cultivated.

  10. Quality planning in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  11. Final Environmental Assessment for the Skid Strip Area Development Plan at Cape Canaveral Air Force Station Florida

    DTIC Science & Technology

    2009-07-01

    including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215...Canaveral Air Force Station (CCAFS) Skid Strip. Since the facility no longer operates as a missile skid strip, it is referred to as the "Airfield...construction of a new 65 foot tall control tower; construction of a new Airfield Manager (AM) Operations Building that would adjoin the new tower; and

  12. Environmental Assessment for the Proposed Construction of a H-70 Fuel Storage Facility and a Medical Pharmacy

    DTIC Science & Technology

    2003-05-01

    Southeast Asia, or the Indian subcontinent including, for example, Cambodia, China, India, Japan, Korea, Malaysia , Pakistan, or the Philippine Islands; and... OSHA ). The State of Colorado also has regulations pertaining to ACM abatement. Emissions of asbestos fibers into the ambient air are regulated in...contours. Construction noise is planned to occur for periods of 8 hours a day, Monday through Saturday. According to the OSHA , it is unacceptable for

  13. Predicting sugar-sweetened behaviours with theory of planned behaviour constructs: Outcome and process results from the SIPsmartER behavioural intervention

    PubMed Central

    Zoellner, Jamie M.; Porter, Kathleen J.; Chen, Yvonnes; Hedrick, Valisa E.; You, Wen; Hickman, Maja; Estabrooks, Paul A.

    2017-01-01

    Objective Guided by the theory of planned behaviour (TPB) and health literacy concepts, SIPsmartER is a six-month multicomponent intervention effective at improving SSB behaviours. Using SIPsmartER data, this study explores prediction of SSB behavioural intention (BI) and behaviour from TPB constructs using: (1) cross-sectional and prospective models and (2) 11 single-item assessments from interactive voice response (IVR) technology. Design Quasi-experimental design, including pre- and post-outcome data and repeated-measures process data of 155 intervention participants. Main Outcome Measures Validated multi-item TPB measures, single-item TPB measures, and self-reported SSB behaviours. Hypothesised relationships were investigated using correlation and multiple regression models. Results TPB constructs explained 32% of the variance cross sectionally and 20% prospectively in BI; and explained 13–20% of variance cross sectionally and 6% prospectively. Single-item scale models were significant, yet explained less variance. All IVR models predicting BI (average 21%, range 6–38%) and behaviour (average 30%, range 6–55%) were significant. Conclusion Findings are interpreted in the context of other cross-sectional, prospective and experimental TPB health and dietary studies. Findings advance experimental application of the TPB, including understanding constructs at outcome and process time points and applying theory in all intervention development, implementation and evaluation phases. PMID:28165771

  14. 5. Photographic copy of construction drawing, dated December 13, 1933, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photographic copy of construction drawing, dated December 13, 1933, Construction Service QMC, Office of the Constructing Quartermaster, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ELEVATIONS AND PLAN, PLAN NO. 6658-1, DRAWING 6658-1, DRAWING 6658-242. - Selfridge Field, Building No. 156, Railroad Avenue at North Jefferson Avenue, Mount Clemens, Macomb County, MI

  15. 29 CFR 4211.3 - Special rules for construction industry and IRC section 404(c) plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Special rules for construction industry and IRC section 404... WITHDRAWING EMPLOYERS General § 4211.3 Special rules for construction industry and IRC section 404(c) plans... covers employees in the building and construction industry shall use the presumptive method for...

  16. 29 CFR 4211.3 - Special rules for construction industry and IRC section 404(c) plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Special rules for construction industry and IRC section 404... WITHDRAWING EMPLOYERS General § 4211.3 Special rules for construction industry and IRC section 404(c) plans... covers employees in the building and construction industry shall use the presumptive method for...

  17. 29 CFR 4211.3 - Special rules for construction industry and IRC section 404(c) plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Special rules for construction industry and IRC section 404... WITHDRAWING EMPLOYERS General § 4211.3 Special rules for construction industry and IRC section 404(c) plans... covers employees in the building and construction industry shall use the presumptive method for...

  18. 29 CFR 4211.3 - Special rules for construction industry and IRC section 404(c) plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Special rules for construction industry and IRC section 404... WITHDRAWING EMPLOYERS General § 4211.3 Special rules for construction industry and IRC section 404(c) plans... covers employees in the building and construction industry shall use the presumptive method for...

  19. 29 CFR 4211.3 - Special rules for construction industry and IRC section 404(c) plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Special rules for construction industry and IRC section 404... WITHDRAWING EMPLOYERS General § 4211.3 Special rules for construction industry and IRC section 404(c) plans... covers employees in the building and construction industry shall use the presumptive method for...

  20. Specific features of modern multifunctional high-rise building construction

    NASA Astrophysics Data System (ADS)

    Manukhina, Lyubov; Samosudova, Natal'ja

    2018-03-01

    The article analyzes the main reasons for the development of high-rise building construction the most important of which-is a limitation of the urban areas and, consequently, the high price of land reserved for construction. New engineering and compositional solutions for the creation of new types of buildings are considered - complex technical designs of a large number of storeys completely meet the new requirements for safety and comfort. Some peculiarities of designing high-rise buildings and searching for optimal architectural and planning solutions are revealed since, with external architectural simplicity, high-rise buildings have complex structural and technological and space-planning solutions. We consider the specific features of a high-rise housing in various countries around the world, including Russia, such as the layout of the multi-storey residential buildings, depending on the climatic characteristics of the regions, assessment of the geological risk of the construction site, the choice of parameters and functional purpose of the sections of the territory of high-rise construction, location of the town-planning object for substantiating the overall dimensions of the building, assessment of changes aeration and engineering and hydrological conditions of the site. A special place in the article on the problems of improvement of the territory, the device of courtyards, landscaping, the device of playing and sports grounds. The main conclusion in the article is the following problem - when developing high-rise housing construction, the development of high-rise housing, and an increase in the population density in the territory of large cities of Russia, necessary to create a comfortable and safe level of residents living and not a decrease, but an improvement in the quality of the urban environment.

  1. 37. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER 800-142. MOBILIZATION BUILDINGS; ALTERNATE PLATFORM CONSTRUCTION; 25'-0' & 29'-6' WIDE BLDG. - TWO STORY; POSTS AND BEARING PARTITIONS; SECTIONS & DETAILS. - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  2. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  3. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  4. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  5. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  6. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  7. Agent planning in AgScala

    NASA Astrophysics Data System (ADS)

    Tošić, Saša; Mitrović, Dejan; Ivanović, Mirjana

    2013-10-01

    Agent-oriented programming languages are designed to simplify the development of software agents, especially those that exhibit complex, intelligent behavior. This paper presents recent improvements of AgScala, an agent-oriented programming language based on Scala. AgScala includes declarative constructs for managing beliefs, actions and goals of intelligent agents. Combined with object-oriented and functional programming paradigms offered by Scala, it aims to be an efficient framework for developing both purely reactive, and more complex, deliberate agents. Instead of the Prolog back-end used initially, the new version of AgScala relies on Agent Planning Package, a more advanced system for automated planning and reasoning.

  8. An Analysis of the Navy’s Fiscal Year 2015 Shipbuilding Plan

    DTIC Science & Technology

    2014-12-01

    include 17 new oilers (which provide fuel and a few other supplies to ships at sea) at a rate of 1 per year through the 2020s; that program would con...Photo by Ensign Joseph Pfaff, U.S. Navy.www.cbo.gov/publication/49818 ContentsSummary 1 The Navy Plans to Buy 264 Ships Over the Next 30 Years 1 CBO...Estimates the New-Ship Construction Costs in the Navy’s Plan At About $19 Billion per Year 1 CBO’s Estimate of Costs Over the Next 30 Years Is One-Third

  9. Nonlinear Control Theory for Missile Autopilot Design.

    DTIC Science & Technology

    1987-04-24

    minimum-time controller which includes constraints on both controls and angle-of-attack is developed and an example is given. -12- - - -~ *% PO PmCF E- A...constructed. In this case, some ideas from robotics on minimum-time trajectory planning under path constraints (see, e.g., Rajan (1985), Sahar and...Auto Cont., Vol. AC-29, No. 4, p. 361. Rajan, V.T. (1985), "Minimum-Time Trajectory Planning ", Proc IEEE Kobotics and Automation Conf., St. Louis. Reed

  10. 48. Photographic copy of original construction plan (Wabasha St. Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. Photographic copy of original construction plan (Wabasha St. Bridge, Plan of Masonry for Abutment, Piers No. 1 and 3, 1888); North abutment, first and second piers - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  11. Problems Related to the Siting of the Laboratory Building for Civil Engineering Department at the University of Warmia and Mazury in Olsztyn, Poland

    NASA Astrophysics Data System (ADS)

    Zagroba, Marek

    2016-10-01

    This paper deals with the conditions underlying and the problems arising from the siting of a building with specialist laboratories in a developed part of the university campus in Olsztyn, Poland. The topography of the terrain and the need to house civil engineering laboratories in the planned building had an immense impact on the shape of the building and consequently on its foundations, whose dimensions responded to the ground conditions and the specification of various loads they would have to support, including the equipment for the laboratories. The siting of a building as a step in the construction process entails several problems, which are first taken into consideration at the stage of making preliminary concept plans and are subsequently verified while working on the final construction plan. The required information included geotechnical documentation, survey of the ground conditions and the data regarding the predicted loads on the building, necessary to select the right type of foundations. All these problems grow in importance when dealing with such unique buildings like the discussed example of a laboratory building for the Civil Engineering Department, built on a site within a conservation zone on the campus of the University of Warmia and Mazury in Olsztyn, Poland. The specific character of the building and the specialist equipment with which it was to be furnished (a resistance testing machine, a 17-meter-long wave flume) necessitated a series of analyses prior to the siting of the building and selecting suitable foundations. In turn, the fact that the new building was to be erected in the conservation zone meant that collaboration with the Heritage Conservation Office had to be undertaken at the stage of making the plan and continued during the construction works. The Heritage Officer's recommendations concerning the building's shape, divisions, dimensions, materials used, etc., created a situation where the team of designers and architects had to become engaged in the process of landscape and spatial management. The above requirements concerned the functions of the building and its siting on a land parcel that was difficult to handle, also because of the protected trees growing there. Other constraints included the small size of this site, the developed surroundings, and the pre-defined programme of functions and use of the new building. On the other hand, the siting of the planned building had to be accommodated to the existing underground infrastructure (utilities). All the above circumstances made the task difficult and demanded good coordination between individual teams of engineers and architects, both at the stage of making the plan and during the construction works.

  12. Design and application of BIM based digital sand table for construction management

    NASA Astrophysics Data System (ADS)

    Fuquan, JI; Jianqiang, LI; Weijia, LIU

    2018-05-01

    This paper explores the design and application of BIM based digital sand table for construction management. Aiming at the demands and features of construction management plan for bridge and tunnel engineering, the key functional features of digital sand table should include three-dimensional GIS, model navigation, virtual simulation, information layers, and data exchange, etc. That involving the technology of 3D visualization and 4D virtual simulation of BIM, breakdown structure of BIM model and project data, multi-dimensional information layers, and multi-source data acquisition and interaction. Totally, the digital sand table is a visual and virtual engineering information integrated terminal, under the unified data standard system. Also, the applications shall contain visual constructing scheme, virtual constructing schedule, and monitoring of construction, etc. Finally, the applicability of several basic software to the digital sand table is analyzed.

  13. Weather support area, floor plan and details. ("Alter COC, Bldg. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Weather support area, floor plan and details. ("Alter COC, Bldg. 2605, Weather Support Area, Floor Plan & Details" Also includes a site plan and a finish schedule. The exact location of this construction is obscure, but it appears to be the enclosure of space at the north end of room 101, the "Display Area" or "War Room") Strategic Air Command, Civil Engineering. Drawing no. B-1081, sheet no. 1 of 2, 9 July 1968; project no. MAR-132-8; CE-562; file drawer 2605-9, also 1315. Various scales. 29x41 inches. pencil on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  14. Solid waste management complex site development plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30more » years so that future facilities and infrastructure will be properly integrated.« less

  15. 50 CFR 85.30 - Grant selection criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... constructing and renovating pumpout and dump stations without an approved plan; (c) In coastal States, proposals for constructing and renovating pumpout and dump stations in accordance with a coastal State's... constructing and renovating pumpout and dump stations in accordance with an inland State's plan; (d) Proposals...

  16. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  17. The Museum Connection, Grade Six: Early Harmonist Life and Construction Techniques. Unit V, Draft #2.

    ERIC Educational Resources Information Center

    Chastain, Marsha; Glendenning, Owen

    This third project of "The Museum Connection" is designed for sixth grade students and is devoted to New Harmony, Indiana's first utopian community (1814-24). Eight lesson plans include information on materials needed and activities. Goals include: (1) to compare and contrast modern-day New Harmony to Harmonie, Indiana in 1816; (2) to…

  18. Development of an automated pre-sampling plan for construction projects : final report.

    DOT National Transportation Integrated Search

    1983-03-01

    The development of an automated pre-sampling plan was undertaken to free the district construction personnel from the cumbersome and time-consuming task of preparing such plans manually. A computer program was written and linked to a data file which ...

  19. 25 CFR 170.415 - What is pre-project planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range... sources and identification of other funding sources to expedite the planning, design, and construction of...

  20. Design of a post-tensioned prestressed concrete pavement, construction guidelines, and monitoring plan.

    DOT National Transportation Integrated Search

    2003-08-01

    Prestressed Concrete Pavement (PCP) has been around for almost 60 years. Its application started in Europe in : the 1940s, and since then it has been applied with fair success in other countries, including the United States. : Domestic application of...

  1. The Education of the Gifted Child in Canada.

    ERIC Educational Resources Information Center

    Nash, Chris, Ed.

    1989-01-01

    Fourteen articles on the education of the gifted child in Canada are presented. Topics addressed include the giftedness construct, Canadian law and policy, integrative program policy, program planning and evaluation, teacher training, disabled gifted students, psychosocial dimensions of giftedness, the Ontario experience, innovative and…

  2. 25 CFR 170.460 - What must a project package include?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....460 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Review... environmental, archeological, and cultural clearances; and (4) Identification of design exceptions if used in...

  3. Summary of NASA-Lewis Research Center solar heating and cooling and wind energy programs

    NASA Technical Reports Server (NTRS)

    Vernon, R. W.

    1975-01-01

    NASA is planning to construct and operate a solar heating and cooling system in conjunction with a new office building being constructed at Langley Research Center. The technology support for this project will be provided by a solar energy program underway at NASA's Lewis Research Center. The solar program at Lewis includes: testing of solar collectors with a solar simulator, outdoor testing of collectors, property measurements of selective and nonselective coatings for solar collectors, and a solar model-systems test loop. NASA-Lewis has been assisting the National Science Foundation and now the Energy Research and Development Administration in planning and executing a national wind energy program. The areas of the wind energy program that are being conducted by Lewis include: design and operation of a 100 kW experimental wind generator, industry-designed and user-operated wind generators in the range of 50 to 3000 kW, and supporting research and technology for large wind energy systems. An overview of these activities is provided.

  4. Exploring the Theory of Planned Behavior to Explain Sugar-Sweetened Beverage Consumption

    PubMed Central

    Estabrooks, Paul; Davy, Brenda; Chen, Yvonnes; You, Wendy

    2011-01-01

    Objective To describe sugar-sweetened beverage (SSB) consumption, establish psychometric properties and utility of a Theory of Planned Behavior (TPB) instrument for SSB consumption. Methods This cross-sectional survey included 119 southwest Virginia participants. Respondents were majority female (66%), white (89%), ≤ high school education (79%), and averaged 41.4 (±13.5) years. A validated beverage questionnaire was used to measure SSB. Eleven TPB constructs were assessed with a 56-item instrument. Analyses included descriptive statistics, one-way ANOVAs, Cronbach alphas, and multiple regressions. Results Sugar-sweetened beverage intake averaged 457 (±430) kilocalories/day. The TPB model provided a moderate explanation of SSB intake (R2=0.38; F=13.10, P<0.01). Behavioral intentions had the strongest relationships with SSB consumption, followed by attitudes, perceived behavioral control, and subjective norms. The six belief constructs did not predict significant variance in the models. Conclusions and Implications Future efforts to comprehensively develop and implement interventions guided by the TPB hold promise for reducing SSB intake. PMID:22154130

  5. Building the U.S. First Offshore Wind Farm-Applying EBM Approaches to Successfully Address Offshore Energy, Commercial Fisheries, and Recreational Boating interactions

    NASA Astrophysics Data System (ADS)

    Lipsky, A.

    2016-12-01

    In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.

  6. Building the U.S. First Offshore Wind Farm-Applying EBM Approaches to Successfully Address Offshore Energy, Commercial Fisheries, and Recreational Boating interactions

    NASA Astrophysics Data System (ADS)

    Lipsky, A.

    2016-02-01

    In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.

  7. [Regional ecological planning and ecological network construction: a case study of "Ji Triangle" Region].

    PubMed

    Li, Bo; Han, Zeng-Lin; Tong, Lian-Jun

    2009-05-01

    By the methods of in situ investigation and regional ecological planning, the present ecological environment, ecosystem vulnerability, and ecological environment sensitivity in "Ji Triangle" Region were analyzed, and the ecological network of the study area was constructed. According to the ecological resources abundance degree, ecological recovery, farmland windbreak system, environmental carrying capacity, forestry foundation, and ecosystem integrity, the study area was classified into three regional ecological function ecosystems, i. e., east low hill ecosystem, middle plain ecosystem, and west plain wetland ecosystem. On the basis of marking regional ecological nodes, the regional ecological corridor (Haerbin-Dalian regional axis, Changchun-Jilin, Changchun-Songyuan, Jilin-Songyuan, Jilin-Siping, and Songyuan-Siping transportation corridor) and regional ecological network (one ring, three links, and three belts) were constructed. Taking the requests of regional ecological security into consideration, the ecological environment security system of "Ji Triangle" Region, including regional ecological conservation district, regional ecological restored district, and regional ecological management district, was built.

  8. 7 CFR 1710.251 - Construction work plans-distribution borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Construction work plans-distribution borrowers. 1710...—distribution borrowers. (a) All distribution borrowers must maintain a current CWP approved by their board of directors covering all new construction, improvements, replacements, and retirements of distribution and...

  9. 7 CFR 4280.119 - Construction planning and performing development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...

  10. 7 CFR 4280.119 - Construction planning and performing development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...

  11. 7 CFR 4280.119 - Construction planning and performing development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy for America Program General Renewable Energy System and Energy Efficiency Improvement Grants... planning, designing, bidding, contracting, and constructing renewable energy systems and energy efficiency... payment. Partial payments will be made in accordance with Form RD 4280-2 and Form RD 1924-6, “Construction...

  12. Planning and scheduling the Hubble Space Telescope: Practical application of advanced techniques

    NASA Technical Reports Server (NTRS)

    Miller, Glenn E.

    1994-01-01

    NASA's Hubble Space Telescope (HST) is a major astronomical facility that was launched in April, 1990. In late 1993, the first of several planned servicing missions refurbished the telescope, including corrections for a manufacturing flaw in the primary mirror. Orbiting above the distorting effects of the Earth's atmosphere, the HST provides an unrivaled combination of sensitivity, spectral coverage and angular resolution. The HST is arguably the most complex scientific observatory ever constructed and effective use of this valuable resource required novel approaches to astronomical observation and the development of advanced software systems including techniques to represent scheduling preferences and constraints, a constraint satisfaction problem (CSP) based scheduler and a rule based planning system. This paper presents a discussion of these systems and the lessons learned from operational experience.

  13. Adversarial reasoning and resource allocation: the LG approach

    NASA Astrophysics Data System (ADS)

    Stilman, Boris; Yakhnis, Vladimir; Umanskiy, Oleg; Boyd, Ron

    2005-05-01

    Many existing automated tools purporting to model the intelligent enemy utilize a fixed battle plan for the enemy while using flexible decisions of human players for the friendly side. According to the Naval Studies Board, "It is an open secret and a point of distress ... that too much of the substantive content of such M&S has its origin in anecdote, ..., or a narrow construction tied to stereotypical current practices of 'doctrinally correct behavior.'" Clearly, such runs lack objectivity by being heavily skewed in favor of the friendly forces. Presently, the military branches employ a variety of game-based simulators and synthetic environments, with manual (i.e., user-based) decision-making, for training and other purposes. However, without an ability to automatically generate the best strategies, tactics, and COA, the games serve mostly to display the current situation rather than form a basis for automated decision-making and effective training. We solve the problem of adversarial reasoning as a gaming problem employing Linguistic Geometry (LG), a new type of game theory demonstrating significant increase in size in gaming problems solvable in real and near-real time. It appears to be a viable approach for solving such practical problems as mission planning and battle management. Essentially, LG may be structured into two layers: game construction and game solving. Game construction includes construction of a game called an LG hypergame based on a hierarchy of Abstract Board Games (ABG). Game solving includes resource allocation for constructing an advantageous initial game state and strategy generation to reach a desirable final game state in the course of the game.

  14. Preliminary study on enhancing waste management best practice model in Malaysia construction industry

    NASA Astrophysics Data System (ADS)

    Jamaludin, Amril Hadri; Karim, Nurulzatushima Abdul; Noor, Raja Nor Husna Raja Mohd; Othman, Nurulhidayah; Malik, Sulaiman Abdul

    2017-08-01

    Construction waste management (CWM) is the practice of minimizing and diverting construction waste, demolition debris, and land-clearing debris from disposal and redirecting recyclable resources back into the construction process. Best practice model means best choice from the collection of other practices that was built for purpose of construction waste management. The practice model can help the contractors in minimizing waste before the construction activities will be started. The importance of minimizing wastage will have direct impact on time, cost and quality of a construction project. This paper is focusing on the preliminary study to determine the factors of waste generation in the construction sites and identify the effectiveness of existing construction waste management practice conducted in Malaysia. The paper will also include the preliminary works of planned research location, data collection method, and analysis to be done by using the Analytical Hierarchy Process (AHP) to help in developing suitable waste management best practice model that can be used in the country.

  15. Urban Climate Map System for Dutch spatial planning

    NASA Astrophysics Data System (ADS)

    Ren, Chao; Spit, Tejo; Lenzholzer, Sanda; Yim, Hung Lam Steve; Heusinkveld, Bert; van Hove, Bert; Chen, Liang; Kupski, Sebastian; Burghardt, René; Katzschner, Lutz

    2012-08-01

    Facing climate change and global warming, outdoor climatic environment is an important consideration factor for planners and policy makers because improving it can greatly contribute to achieve citizen's thermal comfort and create a better urban living quality for adaptation. Thus, the climatic information must be assessed systematically and applied strategically into the planning process. This paper presents a tool named Urban Climate Map System (UCMS) that has proven capable of helping compact cities to incorporate climate effects in planning processes in a systematic way. UCMS is developed and presented in a Geographic Information System (GIS) platform in which the lessons learned and experience gained from interdisciplinary studies can be included. The methodology of UCMS of compact cities, the construction procedure, and the basic input factors - including the natural climate resources and planning data - are described. Some literatures that shed light on the applicability of UMCS are reported. The Municipality of Arnhem is one of Dutch compact urban areas and still under fast urban development and urban renewal. There is an urgent need for local planners and policy makers to protect local climate and open landscape resources and make climate change adaptation in urban construction. Thus, Arnhem is chosen to carry out a case study of UCMS. Although it is the first work of Urban Climatic Mapping in The Netherlands, it serves as a useful climatic information platform to local planners and policy makers for their daily on-going works. We attempt to use a quick method to collect available climatic and planning data and create an information platform for planning use. It relies mostly on literature and theoretical understanding that has been well practiced elsewhere. The effort here is to synergize the established understanding for a case at hand and demonstrate how useful guidance can still be made for planners and policy makers.

  16. 19. Photographic copy of an asconstructed site plan for additions ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographic copy of an as-constructed site plan for additions to North Base: Job No. Muroc A(511), Military Construction, Third District Region, San Bernardino, California; Muroc Bombing Range, Muroc Lake, Calif; Additional Temporary Construction, Materiel Center Flight Test Base, Location Grading & Paving Plan, Sheet No. 1 of 21, March 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  17. Ranking the effects of urban development projects on social determinants of health: health impact assessment.

    PubMed

    Shojaei, Parisa; Karimlou, Masoud; Nouri, Jafar; Mohammadi, Farahnaz; Malek Afzali, Hosein; Forouzan, Ameneh Setareh

    2014-05-30

    Health impact assessment (HIA) offer a very logical and interesting approach for those aiming to integrate health issues into planning processes. With a lot of works and plans waiting to be done (e.g., developing and updating plans, counseling planning commissions, cooperation with other organizations), planners find it difficult to prioritize health among a variety of possible issues and solutions they confront. In the present article, first, the list of social determinants of health associated with Chitgar man-made lake was extracted out using a qualitative method and with content analysis approach, and then they were prioritized using analytic hierarchy process. 28 social determinants of health including "intermediary" and "structural" determinants were extracted out. Regarding positive effects of lake on these determinants, "recreational services" and "traffic" received the highest and the lowest weights with 0.895 and 0.638 respectively among structural determinants and with consideration to "construction" option. Furthermore, among intermediary determinants for "construction" option, sub-criteria of both "physical activity" and "air quality" received the final highest weight (0.889) and "pathogenesis" indicated the lowest weight with 0.617. Moreover, lake demonstrated the highest negative effects on "housing" among "structural" determinants which it takes the highest weight (0.476) in "non-construction" option. Additionally, lake had the highest negative effects on "noise pollution" among "intermediary determinants" and it takes the highest weight (0.467) in "non-construction" option. It has been shown that urban development projects such as green spaces, man-made lakes … have a huge range of effects on community's health, and having not considered these effects by urban planners and mangers is going to confront urban health with many challenges.

  18. 8. Photographic copy of construction drawing, dated November 10, 1932, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of construction drawing, dated November 10, 1932, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLANS, ELEVATIONS, DETAILS, PLAN NO. 635-100. - Selfridge Field, Building No. 129, Wilbur Wright Boulevard at Ash Street, Mount Clemens, Macomb County, MI

  19. 40 CFR 60.1050 - Who must submit a materials separation plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which... separation plan for your municipal waste combustion unit if you commence construction of a new small municipal waste combustion unit after December 6, 2000. (b) If you commence construction of your municipal...

  20. 40 CFR 60.1050 - Who must submit a materials separation plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which... separation plan for your municipal waste combustion unit if you commence construction of a new small municipal waste combustion unit after December 6, 2000. (b) If you commence construction of your municipal...

  1. Choosing Objectives in Over-Subscription Planning

    NASA Technical Reports Server (NTRS)

    Smith, David E.

    2003-01-01

    Many NASA planning problems are over-subscription problems - that is, there are a large number of possible goals of differing value, and the planning system must choose a subset &it car! be accomplished within the limited time and resources available. Examples include planning for telescopes like Hubble, SIRTF, and SOFIA; scheduling for the Deep Space Network; and planning science experiments for a Mars rover. Unfortunately, existing planning systems are not designed to deal with problems like this - they expect a well-defined conjunctive goal and terminate in failure unless the entire goal is achieved. In this paper we develop techniques for over-subscription problems that assist a classical planner in choosing which goals to achieve, and the order in which to achieve them. These techniques use plan graph cost-estimation techniques to construct an orienteering problem, which is then used to provide heuristic advice on the goals and goal order that should considered by a planner.

  2. Preliminary Plans Presented for Construction of John F. Kennedy School and Community Center- 1966 Bond Fund Project No. PS42-62-785-7 and Neighborhood Facilities Grant Project No. GA. N-7.

    ERIC Educational Resources Information Center

    Atlanta Board of Education, GA.

    A proposed project which is a result of the cooperative efforts of many agencies is described. The planned facility will offer to residents of the community, a multitude of needed services which have never been brought together under one roof. The center will include a middle school of grades six to eight for approximately 1,050 students. The…

  3. Strategic real-estate planning can generate revenue.

    PubMed

    Hayes, D; Hays, S

    2001-12-01

    Many healthcare organizations treat their real estate as liabilities rather than assets and overlook opportunities to generate significant additional revenue and reduce costs. An Ernst & Young Study found that to maximize the return on investment in their real-estate holdings, healthcare organizations need to include property management in their strategic plan, manage construction and expansion effectively, adapt and reuse their facilities where possible, and pursue innovative real-estate strategies. Managing real-estate assets effectively can free up capital to use for other core business needs.

  4. Wall Finishes; Carpentry: 901895.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course outline is designed to provide instruction in selecting, preparing, and installing wall finishing materials. Prerequisites for the course include mastery of building construction plans, foundations and walls, and basic mathematics. Intended for use in grades 11 and 12, the course contains five blocks of study totaling 135 hours of…

  5. Spending Paradox

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2005-01-01

    How much does a school cost? It's a straightforward question, but the answer for many education administrators is a frustrating, "It depends." The cost of a school facility surely includes what an education institution pays for the building site, design plans, construction materials, workers who assemble the building, and furniture and equipment…

  6. 26 CFR 1.46-5 - Qualified progress expenditures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 1 2011-04-01 2009-04-01 true Qualified progress expenditures. 1.46-5 Section 1... planning, designing, preparing blueprints, exploring, or securing financing. (ii) The determination of the... construction also does not include research and development activities in a laboratory or experimental setting...

  7. 26 CFR 1.46-5 - Qualified progress expenditures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 1 2010-04-01 2010-04-01 true Qualified progress expenditures. 1.46-5 Section 1... planning, designing, preparing blueprints, exploring, or securing financing. (ii) The determination of the... construction also does not include research and development activities in a laboratory or experimental setting...

  8. 26 CFR 1.46-5 - Qualified progress expenditures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 26 Internal Revenue 1 2014-04-01 2013-04-01 true Qualified progress expenditures. 1.46-5 Section 1... planning, designing, preparing blueprints, exploring, or securing financing. (ii) The determination of the... construction also does not include research and development activities in a laboratory or experimental setting...

  9. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  10. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...

  11. 40 CFR 35.2035 - Rotating biological contractor (RBC) replacement grants.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works... a grant for 100 percent of the cost, including planning and design costs, of modification or...) The RBC failure has significantly increased the project's capital or operation and maintenance costs...

  12. 40 CFR 35.2104 - Funding and other considerations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2104 Funding and other... maintenance of the treatment works throughout the applicant's jurisdiction including the ability to comply... in connection with facilities planning or design work on a wastewater treatment works project. (4...

  13. Seaview/Westshores High School Gymnasium & Classroom Building, Salton City, California.

    ERIC Educational Resources Information Center

    Design Cost Data, 2001

    2001-01-01

    Presents design, construction, and cost data for Salton City, California's, Seaview/Westshores High School Gymnasium and Classroom Building, which is being utilized by the school and surrounding community. Includes a list of project manufacturers and suppliers, along with five photographs and two floor plans. (GR)

  14. 46 CFR 160.035-14 - Procedure for approval of lifeboats.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., plans covering fully the arrangement and construction of the lifeboat, material specifications, together... the Commandant through the Commander of the Coast Guard District in which the lifeboat is built. The plans for approval must be detailed to a degree that the lifeboat can be constructed from the plans...

  15. 46 CFR 160.035-14 - Procedure for approval of lifeboats.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., plans covering fully the arrangement and construction of the lifeboat, material specifications, together... the Commandant through the Commander of the Coast Guard District in which the lifeboat is built. The plans for approval must be detailed to a degree that the lifeboat can be constructed from the plans...

  16. 46. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities planning Office, Iowa State University, Ames, Iowa. SECOND FLOOR PLAN, ROOF PLANS, AND ROOF DETAILS; SHEET NO. 4 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  17. Satellite Power Systems (SPS) concept definition study (exhibit C)

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1978-01-01

    A coplanar satellite conceptual approach was defined. This effort included several trade studies related to satellite design and also construction approaches for this satellite. A transportation system, consistent with this concept, was also studied, including an electric orbit transfer vehicle and a parallel-burn heavy lift launch vehicle. Work on a solid state microwave concept continued and several alternative approaches were evaluated. Computer determination of an optimized transistor and circuit design was also continued. Experiment/verification planning resulted in the development of a total solar array and microwave technology development plan, as well as definition of near-term research to evaluate key technology issues.

  18. Comprehensive assessment of the efficiency of high-rise construction projects in the form of urban blocks

    NASA Astrophysics Data System (ADS)

    Orlov, Alexandr; Chubarkina, Irina

    2018-03-01

    The paper is dedicated to main modern trends in the area of high-rise construction. The classification of buildings and structures by height is given. Functional distribution by the height of buildings is presented. A review of positive and negative aspects of high-rise construction from the economic point of view is given. On the basis of the data obtained, it is proposed to build up residential microdistricts in the form of urban blocks. A plan of microdistricts development is presented. It takes into account urban blocks and includes their main characteristics. An economic and mathematical model was developed to carry out a comprehensive assessment of the effectiveness of high-rise construction projects.

  19. Discussion on design and stress checking of cast-in-place bracket

    NASA Astrophysics Data System (ADS)

    Xi, Tang Xian; Yong, He; Hu, Sun Shuan

    2018-04-01

    The cast-in-place bracket is the main support structure in the construction of bridge. Its strength, stiffness and stability have a direct impact on the quality and the safety of bridge construction. The design and calculation of the bracket in the prestressed concrete box girder are analyzed in this paper. The models including Bailey beam, steel crossbeam and steel columns are established by the finite element software. The strength, stiffness and stability of each model under the most unfavorable load are analyzed by MIDAS Civil. The analysis results verify that the support plan meets the relevant specifications and construction requirements. The feasibility of the support scheme was verified well accordingly. The paper can provide reference and guidance for similar engineering construction.

  20. Evolution of high-rise construction in Leningrad - Saint Petersburg in the middle of the 20th - Early 21st centuries: projects and Implementation

    NASA Astrophysics Data System (ADS)

    Vaytens, Andrey; Rusanov, Gennadiy; Skryabin, Pavel

    2018-03-01

    One of the most important issues in national urban planning is arrangement of high-rise buildings in the largest cities of Russia. This issue becomes especially acute in such cities as Saint Petersburg, which has unique architectural and urban-planning heritage preserved to a great extent. In this regard, it seems important to trace the evolution of high-rise construction development and arrangement in Leningrad - Saint Petersburg in the middle of the 20th — early 21st centuries. The goal of the article is to consider high-rise construction development regarding both public and residential buildings in comparison of project ideas and results of their implementation in the 1940s-2000s. Prerequisites and issues of high-rise construction of that period are considered. Particular attention is paid to changes in the official urban-planning policy, regulatory framework and attitude of city authorities to high-rise construction. The study was carried out with the consideration of the following historic periods differing in their urban-planning policy: the late 1940s-1950s; 1960s; 1970-1980s; 1990s; 2000s-2010s. Economical prerequisites of high-rise construction and their influence on the modern urban-planning policy during the post-Soviet period are considered. In conclusion, an attempt is made to determine tendencies of high-rise construction development in Saint Petersburg.

  1. The effectiveness of CCDSR learning model to improve skills of creating lesson plan and worksheet science process skill (SPS) for pre-service physics teacher

    NASA Astrophysics Data System (ADS)

    Limatahu, I.; Sutoyo, S.; Wasis; Prahani, B. K.

    2018-03-01

    In the previous research, CCDSR (Condition, Construction, Development, Simulation, and Reflection) learning model has been developed to improve science process skills for pre-service physics teacher. This research is aimed to analyze the effectiveness of CCDSR learning model towards the improvement skills of creating lesson plan and worksheet of Science Process Skill (SPS) for pre-service physics teacher in academic year 2016/2017. This research used one group pre-test and post-test design on 12 pre-service physics teacher at Physics Education, University of Khairun. Data collection was conducted through test and observation. Creating lesson plan and worksheet SPS skills of pre-service physics teacher measurement were conducted through Science Process Skill Evaluation Sheet (SPSES). The data analysis technique was done by Wilcoxon t-test and n-gain. The CCDSR learning model consists of 5 phases, including (1) Condition, (2) Construction, (3) Development, (4) Simulation, and (5) Reflection. The results showed that there was a significant increase in creating lesson plan and worksheet SPS skills of pre-service physics teacher at α = 5% and n-gain average of moderate category. Thus, the CCDSR learning model is effective for improving skills of creating lesson plan and worksheet SPS for pre-service physics teacher.

  2. Assessing problem-solving skills in construction education with the virtual construction simulator

    NASA Astrophysics Data System (ADS)

    Castronovo, Fadi

    The ability to solve complex problems is an essential skill that a construction and project manager must possess when entering the architectural, engineering, and construction industry. Such ability requires a mixture of problem-solving skills, ranging from lower to higher order thinking skills, composed of cognitive and metacognitive processes. These skills include the ability to develop and evaluate construction plans and manage the execution of such plans. However, in a typical construction program, introducing students to such complex problems can be a challenge, and most commonly the learner is presented with only part of a complex problem. To support this challenge, the traditional methodology of delivering design, engineering, and construction instruction has been going through a technological revolution, due to the rise of computer-based technology. For example, in construction classrooms, and other disciplines, simulations and educational games are being utilized to support the development of problem-solving skills. Previous engineering education research has illustrated the high potential that simulations and educational games have in engaging in lower and higher order thinking skills. Such research illustrated their capacity to support the development of problem-solving skills. This research presents evidence supporting the theory that educational simulation games can help with the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems. The educational simulation game employed in this study is the Virtual Construction Simulator (VCS). The VCS is a game developed to provide students in an engaging learning activity that simulates the planning and managing phases of a construction project. Assessment of the third iteration of the VCS(3) game has shown pedagogical value in promoting students' motivation and a basic understanding of construction concepts. To further evaluate the benefits on problem-solving skills, a new version of the VCS(4) was developed, with new building modules and assessment framework. The design and development of the VCS4 leveraged research in educational psychology, multimedia learning, human-computer interaction, and Building Information Modeling. In this dissertation the researcher aimed to evaluate the pedagogical value of the VCS4 in fostering problem-solving skills. To answer the research questions, a crossover repeated measures quasi-experiment was designed to assess the educational gains that the VCS can provide to construction education. A group of 34 students, attending a fourth-year construction course at a university in the United States was chosen to participate in the experiment. The three learning modules of the VCS were used, which challenged the students to plan and manage the construction process of a wooden pavilion, the steel erection of a dormitory, and the concrete placement of the same dormitory. Based on the results the researcher was able to provide evidence supporting the hypothesis that the chosen sample of construction students were able to gain and retain problem-solving skills necessary to solve complex construction simulation problems, no matter what the sequence with which these modules were played. In conclusion, the presented results provide evidence supporting the theory that educational simulation games can help the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems.

  3. Risk-based planning analysis for a single levee

    NASA Astrophysics Data System (ADS)

    Hui, Rui; Jachens, Elizabeth; Lund, Jay

    2016-04-01

    Traditional risk-based analysis for levee planning focuses primarily on overtopping failure. Although many levees fail before overtopping, few planning studies explicitly include intermediate geotechnical failures in flood risk analysis. This study develops a risk-based model for two simplified levee failure modes: overtopping failure and overall intermediate geotechnical failure from through-seepage, determined by the levee cross section represented by levee height and crown width. Overtopping failure is based only on water level and levee height, while through-seepage failure depends on many geotechnical factors as well, mathematically represented here as a function of levee crown width using levee fragility curves developed from professional judgment or analysis. These levee planning decisions are optimized to minimize the annual expected total cost, which sums expected (residual) annual flood damage and annualized construction costs. Applicability of this optimization approach to planning new levees or upgrading existing levees is demonstrated preliminarily for a levee on a small river protecting agricultural land, and a major levee on a large river protecting a more valuable urban area. Optimized results show higher likelihood of intermediate geotechnical failure than overtopping failure. The effects of uncertainty in levee fragility curves, economic damage potential, construction costs, and hydrology (changing climate) are explored. Optimal levee crown width is more sensitive to these uncertainties than height, while the derived general principles and guidelines for risk-based optimal levee planning remain the same.

  4. Case Study on Project Risk Management Planning Based on Soft System Methodology

    NASA Astrophysics Data System (ADS)

    Lifang, Xie; Jun, Li

    This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.

  5. 609th Iraqi National Guard Battalion Garrison, Thi Qar Governorate, Iraq

    DTIC Science & Technology

    2006-07-25

    views of structural members (reinforced concrete footers, columns , beams , floor, and roof slabs). Mechanical drawings included plumbing plans and...well as reinforced concrete columns and beams . The exterior walls were constructed with sand lime block. Although the assessment team did not...foundation support for the perimeter wall included reinforced concrete footers to support the columns and a reinforced concrete tie beam under the wall

  6. Building a 600-Ship Navy: Costs, Time, and Alternative Approaches

    DTIC Science & Technology

    1982-03-01

    distributed-force operations but not currently included in Navy construction plans. These include 12 guided missile aviation cruisers ( CGV ) and 61...guided missile destroyers (DDGY). The CGVs would be equipped With a balanced suite of ship- mounted anti-air, antisubmarine, and antisurface weapons... CGV ) with extensive facilities for supporting V/STOL aircraft. These cruisers would operate with surface action groups and underway replenishment

  7. TRUSS DETAILS. United Engineering Company Ltd., Alameda Shipyard. Includes crane ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TRUSS DETAILS. United Engineering Company Ltd., Alameda Shipyard. Includes crane girder section. No architect noted. Drawn by Penney. Plan no. 2-N-7. March 10, 1942, no revisions. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76, item no. 22A. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Warehouse, 2900 Main Street, Alameda, Alameda County, CA

  8. 11. Photographic copy of construction drawing, dated July 29, 1932, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of construction drawing, dated July 29, 1932, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-2511 SDO 139 (FLOOR PLANS) - Selfridge Field, Building Nos. 246 & 253, 246 Birch Street & 253 Wagner Street, Mount Clemens, Macomb County, MI

  9. 10. Photographic copy of construction drawing, dated February 6, 1931, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of construction drawing, dated February 6, 1931, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FOUNDATION, FIRST FLOOR PLANS, ELEVATIONS, DETAILS, PLAN NO. 6658-130. - Selfridge Field, Building No. 121, Wilbur Wright Avenue west of Ash Street, Mount Clemens, Macomb County, MI

  10. 7 CFR Exhibit L to Subpart A of... - Insured 10-Year Home Warranty Plan Requirements

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., construction inspection procedures, coverage provided and claims procedures. (5) A sample copy of the warranty... AGENCY, DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Construction and Other Development Pt. 1924, Subpt. A, Exh. L Exhibit L to Subpart A of Part 1924—Insured 10...

  11. 24 CFR 990.145 - Dwelling units with approved vacancies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... work, and the construction is on schedule according to a HUD-approved PHA Annual Plan; or (ii) The unit... PHA Annual Plan, but the time period for placing the vacant unit under construction has not yet expired. The PHA shall place the vacant unit under construction within two federal fiscal years (FFYs...

  12. Langley Research Center's Unitary Plan Wind Tunnel: Testing Capabilities and Recent Modernization Activities

    NASA Technical Reports Server (NTRS)

    Micol, John R.

    2001-01-01

    Description, capabilities, initiatives, and utilization of the NASA Langley Research Center's Unitary Plan Wind Tunnel are presented. A brief overview of the facility's operational capabilities and testing techniques is provided. A recent Construction of Facilities (CoF) project to improve facility productivity and efficiency through facility automation has been completed and is discussed. Several new and maturing thrusts are underway that include systematic efforts to provide credible assessment for data quality, modifications to the new automation control system for increased compatibility with the Modern Design Of Experiments (MDOE) testing methodology, and process improvements for better test coordination, planning, and execution.

  13. Langley Research Center's Unitary Plan Wind Tunnel: Testing Capabilities and Recent Modernization Activities

    NASA Technical Reports Server (NTRS)

    Micol, John R.

    2001-01-01

    Description, capabilities, initiatives, and utilization of the NASA Langley Research Center's Unitary Plan Wind Tunnel are presented. A brief overview of the facility's operational capabilities and testing techniques is provided. A recent Construction of Facilities (Car) project to improve facility productivity and efficiency through facility automation has been completed and is discussed. Several new and maturing thrusts are underway that include systematic efforts to provide credible assessment for data quality, modifications to the new automation control system for increased compatibility with the Modern Design of Experiments (MDOE) testing methodology, and process improvements for better test coordination, planning, and execution.

  14. Construction of shipping channels in the Detroit River—History and environmental consequences

    USGS Publications Warehouse

    Bennion, David H.; Manny, Bruce A.

    2011-01-01

    The Detroit River is one of the most biologically diverse areas in the Great Lakes basin. It has been an important international shipping route since the 1820s and is one of the busiest navigation centers in the United States. Historically, it supported one of the most profitable Lake Whitefish (Coregonus clupeaformis) commercial fisheries in the Great Lakes. Since 1874, the lower Detroit River has been systematically and extensively modified, by construction of deepwater channels, to facilitate commercial shipping. Large-scale dredging, disposal of dredge spoils, and construction of water-level compensating works has greatly altered channel morphology and flow dynamics of the river, disrupting ecological function and fishery productivity of the river and influencing Great Lakes water levels. From 1874 to 1968, major construction projects created 96.5 kilometers (60 miles) of shipping channels, removed over 46,200,000 m3 of material, covered 4,050 hectares (40.5 square kilometers) of river bottom with dredge spoils, and built 85 hectares of above-waterline compensating works at a total cost of US$283 million. Interest by industries and government agencies to develop the river further for shipping is high and increasing. Historically, as environmental protection agencies were created, construction impacts on natural resources were increasingly addressed during the planning process and, in some cases, assessments of these impacts greatly altered or halted proposed construction projects. Careful planning of future shipping-channel construction and maintenance projects, including a thorough analysis of the expected environmental impacts, could greatly reduce financial costs and ecological damages as compared to past shipping-channel construction projects.

  15. 23 CFR 970.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... planning, design, construction, maintenance, and operations. (c) The SMS shall be designed to fit the NPS... for the collection, maintenance and reporting of a data base that includes: (i) Accident records with... standards) for low volume roads may be tailored to be consistent with the functional classification of the...

  16. 40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the actual reasonable and necessary costs for preparing the pre-bid package. (4) Post-construction... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to...

  17. 40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the actual reasonable and necessary costs for preparing the pre-bid package. (4) Post-construction... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to...

  18. 40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the actual reasonable and necessary costs for preparing the pre-bid package. (4) Post-construction... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to...

  19. 78 FR 18970 - Trunkline LNG Company, LLC; Trunkline LNG Export, LLC; Trunkline Gas Company, LLC; Supplemental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... include plans to construct and modify certain pipeline facilities to supply natural gas to the..., Louisiana to supply natural gas to the liquefaction facility from existing gas transmission pipelines... greenfield natural gas pipeline (Mainline Connector) in Jefferson Davis and Calcasieu Parishes, Louisiana...

  20. Building Online Communities. Take Your Site beyond Content: Construct a Society on the Web.

    ERIC Educational Resources Information Center

    Glaser, Mark

    1997-01-01

    Discusses the establishment of online, or virtual, communities on the World Wide Web. Topics include corporate sites; community planning; virtual reality; games; America Online projects; MUDs (multiuser dungeons) and MOOs (multiuser object oriented); and a list of contacts for online community resources. (LRW)

  1. Lester Crane: Getting Approvals After the Fact.

    ERIC Educational Resources Information Center

    Schaub, Mark F.

    1998-01-01

    Presents a case study for use in business communication classes to help students understand and learn both the context and the strategies for communication with business and management. Discusses planning required to do business (selling speciality construction cranes) in the Middle East. Includes some correspondence and two assignments. (SR)

  2. 77 FR 1498 - Draft Environmental Assessment and Proposed Single-Species Habitat Conservation Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ... wind turbines and associated facilities and access roads, maintenance of the wind turbines and... include constructing and installing the wind turbines and associated electrical facilities and access... new 230- kilovolt substation (to be built on an existing pad), maintaining the new wind turbines and...

  3. Clothing Construction: An Instructional Package with Adaptations for Visually Impaired Individuals.

    ERIC Educational Resources Information Center

    Crawford, Glinda B.; And Others

    Developed for the home economics teacher of mainstreamed visually impaired students, this guide provides clothing instruction lesson plans for the junior high level. First, teacher guidelines are given, including characteristics of the visually impaired, orienting such students to the classroom, orienting class members to the visually impaired,…

  4. 46 CFR 189.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., the arrangement of the alarm and extinguishing systems, the fire extinguishers, means of access to... other fire control features. (3) Details of alarm systems. (4) Details of extinguishing systems, including fire mains, carbon dioxide, clean agent, foam, and sprinkling systems. (e) Marine engineering. For...

  5. 46 CFR 189.55-5 - Plans and specifications required for new construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., the arrangement of the alarm and extinguishing systems, the fire extinguishers, means of access to... other fire control features. (3) Details of alarm systems. (4) Details of extinguishing systems, including fire mains, carbon dioxide, clean agent, foam, and sprinkling systems. (e) Marine engineering. For...

  6. 77 FR 30002 - Primary Power, LLC v. PJM Interconnection, LLC; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... Respondent) for the Respondent's failure to designate the Complainant to construct, own, and finance two static VAR compensator (``SVC'') projects sponsored by the Complainant that have been included in the PJM Regional Transmission Expansion Plan. The Complainant requests that the Commission grant emergency, interim...

  7. Noise and Sound Control in Open Plan Schools.

    ERIC Educational Resources Information Center

    Schellenberg, Ben

    This annotated bibliography includes summaries of 19 articles and reports dealing with noise control and acoustical design in school buildings. A brief introduction discusses the need for careful attention to acoustics in any school construction or remodeling project, with particular emphasis on the need for special acoustical measures in an open…

  8. Mountain Plains Learning Experience Guide: Marketing. Course: Visual Merchandising.

    ERIC Educational Resources Information Center

    Preston, T.; Egan, B.

    One of thirteen individualized courses included in a marketing curriculum, this course covers the steps to be followed in planning, constructing, and evaluating the effectiveness of merchandise displays. The course is comprised of one unit, General Merchandise Displays. The unit begins with a Unit Learning Experience Guide that gives directions…

  9. Custom Sewing, Modules One, Two, and Three. Instructor Guide.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Instructional Materials Lab.

    This document consists of three modules designed for a custom apparel and garment sewing program teaching students to construct, alter, and prepare garments and home fashions to customer specifications. Each module includes some or all of the following components: performance objectives, lesson plans, suggested activities, information sheets,…

  10. Creating a Classroom Kaleidoscope with the World Wide Web.

    ERIC Educational Resources Information Center

    Quinlan, Laurie A.

    1997-01-01

    Discusses the elements of classroom Web presentations: planning; construction, including design tips; classroom use; and assessment. Lists 14 World Wide Web resources for K-12 teachers; Internet search tools (directories, search engines and meta-search engines); a Web glossary; and an example of HTML for a simple Web page. (PEN)

  11. Development and construct validation of the Client-Centredness of Goal Setting (C-COGS) scale.

    PubMed

    Doig, Emmah; Prescott, Sarah; Fleming, Jennifer; Cornwell, Petrea; Kuipers, Pim

    2015-07-01

    Client-centred philosophy is integral to occupational therapy practice and client-centred goal planning is considered fundamental to rehabilitation. Evaluation of whether goal-planning practices are client-centred requires an understanding of the client's perspective about goal-planning processes and practices. The Client-Centredness of Goal Setting (C-COGS) was developed for use by practitioners who seek to be more client-centred and who require a scale to guide and evaluate individually orientated practice, especially with adults with cognitive impairment related to acquired brain injury. To describe development of the C-COGS scale and examine its construct validity. The C-COGS was administered to 42 participants with acquired brain injury after multidisciplinary goal planning. C-COGS scores were correlated with the Canadian Occupational Performance Measure (COPM) importance scores, and measures of therapeutic alliance, motivation, and global functioning to establish construct validity. The C-COGS scale has three subscales evaluating goal alignment, goal planning participation, and client-centredness of goals. The C-COGS subscale items demonstrated moderately significant correlations with scales measuring similar constructs. Findings provide preliminary evidence to support the construct validity of the C-COGS scale, which is intended to be used to evaluate and reflect on client-centred goal planning in clinical practice, and to highlight factors contributing to best practice rehabilitation.

  12. 33. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER 800-190. MOBILIZATION BUILDINGS; STANDARD DETAILS; SMOKE PIPE & FLUE DETAILS. - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  13. 40 CFR 49.9868 - Permits to construct.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9868 Permits to construct. Permits to...

  14. Constance mirror program: Progress and plans

    NASA Technical Reports Server (NTRS)

    Klinkowstein, R. E.; Mauel, M. E.; Irby, J. H.; Smullin, L. D.; Voldman, S. H.

    1981-01-01

    The current state of the mechanics of the Constance II experiment, the physics results gathered, the motivation background, and future plans for the Constance II experiment are reviewed. Several improvements have been made and several experimental investigations have been completed. These include the construction/installation/testing of: (1) liquid-nitrogen cooled, Ioffe bars installed, (2) a diverter coil (3) the 100 kW ICRF generator, (4) the data acquisition system, and (5) the optimum hot-iron operation of the machine with Titanium and pulsed-gas plasma guns. Measurements were made of the density, temperature, and radius of the plasma. Ion-cyclotron fluctuations were observed, their bandwidth measured, and data collected demonstrating resonance heating. New X-ray diagnostics were designed and purchased, and progress on the Thomson scattering was made. Finally, a new hot cathode gun was designed and constructed.

  15. Minimizing delays in the Jordanian construction industry by adopting BIM technology

    NASA Astrophysics Data System (ADS)

    Btoush, M.; Harun, A. T.

    2017-11-01

    The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist.

  16. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  17. 12. Photographic copy of construction drawing, dated June 7, 1933, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photographic copy of construction drawing, dated June 7, 1933, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-2517, SDO 186 F41 (FLOOR PLAN) - Selfridge Field, Building Nos. 248, 252 & 254, 248 Birch Street & 252, 254 Wagner Street, Mount Clemens, Macomb County, MI

  18. Principles of Good School Building Design. School Buildings Planning, Design, and Construction Series No. 3.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on school building design issues, such as the fundamentals of good design and designs that accommodate change, issues affecting…

  19. Making the Most of Your School Site. School Buildings Planning, Design, and Construction Series No. 2.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on site selection covering selection criteria; traffic issues; and site services, such as water, power, and sewer. Additionally…

  20. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Treesearch

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  1. Planning for Safety on the Jobsite. Safety in Industry, Construction Industry Series.

    ERIC Educational Resources Information Center

    Occupational Safety and Health Administration, Washington, DC.

    Work injuries and their monetary losses in the construction industry can be effectively prevented only through an aggressive and well-planned safety effort. The purpose of this bulletin is to provide guidelines to aid the construction contractor in complying with legal requirements and in attaining the objective of keeping costly accidents and…

  2. Knowledge exchange for climate adaptation planning in western North America

    NASA Astrophysics Data System (ADS)

    Garfin, Gregg; Orr, Barron

    2015-04-01

    In western North America, the combination of sustained drought, rapid ecosystem changes, and land use changes associated with urban population growth has motivated concern among ecosystem managers about the implications of future climate changes for the landscapes which they manage. Through literature review, surveys, and workshop discussions, we assess the process of moving from concern, to planning, to action, with an emphasis on questions, such as: What are the roles of boundary organizations in facilitating knowledge exchange? Which practices lead to effective interactions between scientists, decision-makers, and knowledge brokers? While there is no "one size fits all" science communication method, the co-production of science and policy by research scientists, science translators, and decision-makers, as co-equals, is a resource intensive, but effective practice for moving adaptation planning forward. Constructive approaches make use of alliances with early adopters and opinion leaders, and make strong communication links between predictions, impacts and solutions. Resource managers need information on the basics of regional climate variability and global climate change, region-specific projections of climate changes and impacts, frank discussion of uncertainties, and opportunities for candid exploration of these topics with peers and subject experts. Research scientists play critical roles in adaptation planning discussions, because they assist resource managers in clarifying the cascade of interactions leading to potential impacts and, importantly, because decision-makers want to hear the information straight from the scientists conducting the research, which bolsters credibility. We find that uncertainty, formerly a topic to avoided, forms the foundation for constructive progress in adaptation planning. Candid exploration of the array of uncertainties, including those due to modeling, institutional, policy and economic factors, with practitioners, science translators, and subject experts, stimulates constructive thinking on adaptation strategies. Discussion support to explore multiple future scenarios and research nuances advances the discussion beyond "uncertainty paralysis."

  3. Household waste behaviours among a community sample in Iran: an application of the theory of planned behaviour.

    PubMed

    Pakpour, Amir H; Zeidi, Isa Mohammadi; Emamjomeh, Mohammad Mahdi; Asefzadeh, Saeed; Pearson, Heidi

    2014-06-01

    Understanding the factors influencing recycling behaviour can lead to better and more effective recycling programs in a community. The goal of this study was to examine factors associated with household waste behaviours in the context of the theory of planned behaviour (TPB) among a community sample of Iranians that included data collection at time 1 and at follow-up one year later at time 2. Study participants were sampled from households under the coverage of eight urban health centers in the city of Qazvin. Of 2000 invited households, 1782 agreed to participate in the study. A self-reported questionnaire was used for assessing socio-demographic factors and the TPB constructs (i.e. attitude, subjective norms, perceived behavioural control, and intention). Furthermore, questions regarding moral obligation, self-identity, action planning, and past recycling behaviour were asked, creating an extended TPB. At time 2, participants were asked to complete a follow-up questionnaire on self-reported recycling behaviours. All TPB constructs had positive and significant correlations with each other. Recycling behaviour at time 1 (past behaviour) significantly related to household waste behaviour at time 2. The extended TPB explained 47% of the variance in household waste behaviour at time 2. Attitude, perceived behavioural control, intention, moral obligation, self-identity, action planning, and past recycling behaviour were significant predictors of household waste behaviour at time 2 in all models. The fact that the expanded TPB constructs significantly predicted household waste behaviours holds great promise for developing effective public campaigns and behaviour-changing interventions in a region where overall rates of household waste reduction behaviours are low. Our results indicate that educational materials which target moral obligation and action planning may be particularly effective. Copyright © 2013 Elsevier Ltd. All rights reserved.

  4. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  5. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  6. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  7. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  8. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  9. Planning and evaluation parameters for offshore complexes

    NASA Technical Reports Server (NTRS)

    Sincoff, M. Z. (Editor); Dajani, J. S. (Editor)

    1976-01-01

    Issues are presented for consideration in the planning and design of offshore artificial complexes. The construction of such complexes, their social, economic, and ecological impacts, and the legal-political-institutional environments within which their development could occur, are discussed. Planning, design, and construction of near-shore complexes located off the Mid-Atlantic coast of the United States is emphasized.

  10. 40 CFR Table 1 to Subpart Ggg of... - States That Have an Approved and Effective State Plan a

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or Reconstructed Since May 30, 1991... this Federal plan if it commenced construction before May 30, 1991 and has not been modified or...

  11. 40 CFR Table 1 to Subpart Ggg of... - States That Have an Approved and Effective State Plan a

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to May 30, 1991 and Have Not Been Modified or Reconstructed Since May 30, 1991... this Federal plan if it commenced construction before May 30, 1991 and has not been modified or...

  12. PREFACE: International Scientific Conference of Young Scientists: Advanced Materials in Construction and Engineering (TSUAB2014)

    NASA Astrophysics Data System (ADS)

    Kopanitsa, Natalia O.

    2015-01-01

    In October 15-17, 2014 International Scientific Conference of Young Scientists: Advanced Materials in Construction and Engineering (TSUAB2014) took place at Tomsk State University of Architecture and Building (Tomsk, Russia). The Conference became a discussion platform for researchers in the fields of studying structure and properties of advanced building materials and included open lectures of leading scientists and oral presentations of master, postgraduate and doctoral students. A special session was devoted to reports of school children who further plan on starting a research career. The Conference included an industrial exhibition where companies displayed the products and services they supply. The companies also gave presentations of their products within the Conference sessions.

  13. Evaluation of the varying Naturally Occurring Asbestos mitigation measures at School and Commercial construction projects in California

    NASA Astrophysics Data System (ADS)

    Kalika, S.

    2012-12-01

    In commercial development or K-12 school construction, project sites are often purchased and much of the planning process completed prior to an assessment of the soils proposed for excavation or potential offhaul. Geologic maps, while initially helpful for identifying potential hazards such as landslides and earthquake faults, are less helpful in the identification of naturally occurring hazardous minerals, such as the seven regulated minerals currently classified as asbestos. Geologic maps identify mafic and ultramafic bedrock zones; however, a skilled geologist with knowledge of asbestos hazards will further visualize the earth-shaping processes that may have resulted in the deposition of naturally occurring asbestos in locations outside mapped ultramafic zones including the base of an alluvial fan or within streambed channels. When sampled as an afterthought prior to disposal, property owners are surprised by the budget-crippling costs of waste handling and disposal of NOA, as well as mitigations required to protect the health of construction workers, the public, and future site occupants. The California Air Resources Board (CARB) continues to lead the way in evaluation and regulation of NOA, through development of the CARB 435 preparation and laboratory analytical method, local enforcement of the Asbestos Airborne Toxic Control Measure for Construction, Grading, Quarrying, and Surface Mining Operations (ATCM), and implementation of dust control measures to protect public health. A thorough site evaluation and construction design includes utilization of the sampling methods developed by the California Geological Survey, laboratory analytical methods within CARB 435, and mitigation measures required by CARB, DTSC, and OSHA for the protection of worker and public health after NOA is discovered. The site evaluation should additionally include an assessment of the future site usage, as regulations differ based on potential health affects to future occupants. Construction and long-term monitoring at an elementary school differs in regulatory requirements from construction of a commercial property. This presentation will highlight two case studies: a school project with several years of advance planning versus a commercial property where NOA was discovered weeks before the start of construction. The presentation will analyze the regulatory differences, mitigation measures, and consideration of the financial impacts that the discovery of NOA can have on a school versus a commercial project.

  14. ENHANCED PRACTICAL PHOTOSYNTHETIC CO2 MITIGATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dr. Gregory Kremer; Dr. David J. Bayless; Dr. Morgan Vis

    2001-07-25

    This quarterly report documents significant achievements in the Enhanced Practical Photosynthetic CO{sub 2} Mitigation project during the period from 4/03/2001 through 7/02/2001. Most of the achievements are milestones in our efforts to complete the tasks and subtasks that constitute the project objectives. Note that this version of the quarterly technical report is a revision to add the reports from subcontractors Montana State and Oak Ridge National Laboratories The significant accomplishments for this quarter include: Development of an experimental plan and initiation of experiments to create a calibration curve that correlates algal chlorophyll levels with carbon levels (to simplify future experimentalmore » procedures); Completion of debugging of the slug flow reactor system, and development of a plan for testing the pressure drop of the slug flow reactor; Design and development of a new bioreactor screen design which integrates the nutrient delivery drip system and the harvesting system; Development of an experimental setup for testing the new integrated drip system/harvesting system; Completion of model-scale bioreactor tests examining the effects of CO{sub 2} concentration levels and lighting levels on Nostoc 86-3 growth rates; Completion of the construction of a larger model-scale bioreactor to improve and expand testing capabilities and initiation of tests; Substantial progress on construction of a pilot-scale bioreactor; and Preliminary economic analysis of photobioreactor deployment. Plans for next quarter's work are included in the conclusions. A preliminary economic analysis is included as an appendix.« less

  15. DOSIMETRIC CONSEQUENCES OF USING CONTRAST-ENHANCED COMPUTED TOMOGRAPHIC IMAGES FOR INTENSITY-MODULATED STEREOTACTIC BODY RADIOTHERAPY PLANNING.

    PubMed

    Yoshikawa, Hiroto; Roback, Donald M; Larue, Susan M; Nolan, Michael W

    2015-01-01

    Potential benefits of planning radiation therapy on a contrast-enhanced computed tomography scan (ceCT) should be weighed against the possibility that this practice may be associated with an inadvertent risk of overdosing nearby normal tissues. This study investigated the influence of ceCT on intensity-modulated stereotactic body radiotherapy (IM-SBRT) planning. Dogs with head and neck, pelvic, or appendicular tumors were included in this retrospective cross-sectional study. All IM-SBRT plans were constructed on a pre- or ceCT. Contours for tumor and organs at risk (OAR) were manually constructed and copied onto both CT's; IM-SBRT plans were calculated on each CT in a manner that resulted in equal radiation fluence. The maximum and mean doses for OAR, and minimum, maximum, and mean doses for targets were compared. Data were collected from 40 dogs per anatomic site (head and neck, pelvis, and limbs). The average dose difference between minimum, maximum, and mean doses as calculated on pre- and ceCT plans for the gross tumor volume was less than 1% for all anatomic sites. Similarly, the differences between mean and maximum doses for OAR were less than 1%. The difference in dose distribution between plans made on CTs with and without contrast enhancement was tolerable at all treatment sites. Therefore, although caution would be recommended when planning IM-SBRT for tumors near "reservoirs" for contrast media (such as the heart and urinary bladder), findings supported the use of ceCT with this dose calculation algorithm for both target delineation and IM-SBRT treatment planning. © 2015 American College of Veterinary Radiology.

  16. Strategic planning to reduce conflicts for offshore wind development in Taiwan: A social marketing perspective.

    PubMed

    Chen, Jyun-Long; Liu, Hsiang-Hsi; Chuang, Ching-Ta

    2015-10-15

    This study aims to improve the current inefficiency and ineffectiveness of communications among stakeholders when planning and constructing offshore wind farms (OWFs). An analysis using a social marketing approach with segmentation techniques is used to identify the target market based on stakeholders' perceptions. The empirical results identify three stakeholder segments: (1) impact-attend group; (2) comprehensive group; and (3) benefit-attend group. The results suggest that communication should be implemented to alter stakeholders' attitudes toward the construction of OWFs. Furthermore, based on the results of segmentation, target markets are identified to plan the communication strategies for reducing the conflicts among stakeholders of OWF construction. The results also indicated that in the planning phase of construction for OWFs, effective stakeholder participation and policy communication can enhance the perception of benefits to reduce conflict with local communities and ocean users. Copyright © 2015 Elsevier Ltd. All rights reserved.

  17. Economic benefits of improved meteorological forecasts - The construction industry

    NASA Technical Reports Server (NTRS)

    Bhattacharyya, R. K.; Greenberg, J. S.

    1976-01-01

    Estimates are made of the potential economic benefits accruing to particular industries from timely utilization of satellite-derived six-hour weather forecasts, and of economic penalties resulting from failure to utilize such forecasts in day-to-day planning. The cost estimate study is centered on the U.S. construction industry, with results simplified to yes/no 6-hr forecasts on thunderstorm activity and work/no work decisions. Effects of weather elements (thunderstorms, snow and sleet) on various construction operations are indicated. Potential dollar benefits for other industries, including air transportation and other forms of transportation, are diagrammed for comparison. Geosynchronous satellites such as STORMSAT, SEOS, and SMS/GOES are considered as sources of the forecast data.

  18. 28. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER 800-154. MOBILIZATION BUILDINGS; STANDARD DOOR DETAILS; TYPES SCHEDULES & DETAILS. (This photograph was copied from a drawing at Fort McCoy. There is no negative of this drawing in the Military Construction 105mm. Negative Collection at Fort Belvoir.) - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  19. The Abbott School Construction Program: Report on the NJ Department of Education Proposed Regulations on Long-Range Facilities Plans

    ERIC Educational Resources Information Center

    Ponessa, Joan

    2004-01-01

    This report on Long Range Facilities Plans (LRFPs) analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State…

  20. CasCADe: A Novel 4D Visualization System for Virtual Construction Planning.

    PubMed

    Ivson, Paulo; Nascimento, Daniel; Celes, Waldemar; Barbosa, Simone Dj

    2018-01-01

    Building Information Modeling (BIM) provides an integrated 3D environment to manage large-scale engineering projects. The Architecture, Engineering and Construction (AEC) industry explores 4D visualizations over these datasets for virtual construction planning. However, existing solutions lack adequate visual mechanisms to inspect the underlying schedule and make inconsistencies readily apparent. The goal of this paper is to apply best practices of information visualization to improve 4D analysis of construction plans. We first present a review of previous work that identifies common use cases and limitations. We then consulted with AEC professionals to specify the main design requirements for such applications. These guided the development of CasCADe, a novel 4D visualization system where task sequencing and spatio-temporal simultaneity are immediately apparent. This unique framework enables the combination of diverse analytical features to create an information-rich analysis environment. We also describe how engineering collaborators used CasCADe to review the real-world construction plans of an Oil & Gas process plant. The system made evident schedule uncertainties, identified work-space conflicts and helped analyze other constructability issues. The results and contributions of this paper suggest new avenues for future research in information visualization for the AEC industry.

  1. The Impacts of Highway Expansion on Population Change: An Integrated Spatial Approach

    ERIC Educational Resources Information Center

    Chi, Guangqing

    2010-01-01

    The effects of highways on transforming human society and promoting population change have been investigated in several disciplines, including geography, sociology, economics, and planning. Currently, the primary highway construction activity in the nation is highway expansion; however, this expansion has not been the focus of much of the existing…

  2. 75 FR 13058 - Approval and Promulgation of Implementation Plans; Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... for the control of nonmetallic mineral processing plants (IDEQ Docket 58-0101-0002 and a portion of..., 204 and 205 now include language stating that the applicable Federal regulations are incorporated by....01.01.200. IDAPA 58.01.01.225 Permit to Construct Processing Fee, was revised for consistency with...

  3. Wave Energy Prize - General Information

    DOE Data Explorer

    Scharmen, Wesley

    2016-12-01

    All the informational files, templates, rules and guidelines for Wave Energy Prize (WEP), including the Wave Energy Prize Rules, Participant Terms and Conditions Template, WEC Prize Name, Logo, Branding, WEC Publicity, Technical Submission Template , Numerical Modeling Template, SSTF Submission Template, 1/20th Scale Model Design and Construction Plan Template, Final Report template, and Webinars.

  4. Internal versus External Control of Reinforcement: A Review of the Locus of Control Construct

    ERIC Educational Resources Information Center

    Kormanik, Martin B.; Rocco, Tonette S.

    2009-01-01

    One aspect of personality, perceptions of internal versus external control of reinforcement, shifts under conditions of change. This review of the literature examines the relationship between planned organizational change and locus of control. The review includes literature from the disciplines of clinical and social psychology, adult development,…

  5. College and University Dining Services Administrators' Intention to Adopt Sustainable Practices: Results from US Institutions

    ERIC Educational Resources Information Center

    Chen, Chao-Jung; Gregoire, Mary B.; Arendt, Susan; Shelley, Mack C.

    2011-01-01

    Purpose: The purpose of this paper is to examine college and university dining services administrators' (CUDSAs) intention to adopt sustainable practices. Design/methodology/approach: The theory of planned behavior (TPB) including constructs of subjective norm (SN), attitude, perceived behavior control, and personal norm (PN), formed the…

  6. Quality Assurance in E-Learning: PDPP Evaluation Model and Its Application

    ERIC Educational Resources Information Center

    Zhang, Weiyuan; Cheng, Y. L.

    2012-01-01

    E-learning has become an increasingly important teaching and learning mode in educational institutions and corporate training. The evaluation of e-learning, however, is essential for the quality assurance of e-learning courses. This paper constructs a four-phase evaluation model for e-learning courses, which includes planning, development,…

  7. 75 FR 8395 - Bunker Hill Groundwater Basin, Riverside-Corona Feeder Project, San Bernardino and Riverside...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Bunker Hill Groundwater Basin, Riverside-Corona...) will prepare a joint EIS/EIR for the proposed Riverside-Corona Feeder Project. The public and agencies... participate in the planning, design, and construction of the Riverside-Corona Feeder Project including: (i) 20...

  8. Simulation of Teacher Demand, Demographics, and Mobility: A Preliminary Report.

    ERIC Educational Resources Information Center

    Baugh, William H.; Stone, Joe A.

    A Markov chain is used to construct a simulation model of the educator labor market in Oregon. The variables crucial to this study, drawn from the University of Southern California faculty planning model, include factors such as appointment rate; age; probability of attaining promotion; retirement, resignation and mortality rates; length of…

  9. The Metamorphosis of a Football Stadium.

    ERIC Educational Resources Information Center

    van der Have, Pieter J.

    1999-01-01

    Examines the planning, renovation and enlargement, and funding of a new University of Utah football stadium that would also be used in the 2002 Winter Olympics. Contractor selection, solutions to construction challenges, and the steps taken to minimize risk and guarantee success of the projects are discussed, including the fact that the stadium is…

  10. Federal Guidelines - Operation and Maintenance of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Water Programs.

    This document contains the federal guidelines for meeting the specific requirements of the Federal Water Pollution Control Act Amendments of 1972. These guidelines are also intended to assist in meeting the regulations for grant assisted facility construction and to provide information on the key elements to be included in the operation plans for…

  11. Constructing Green: Sustainability and the Places We Inhabit

    ERIC Educational Resources Information Center

    Ponce de Leon, Monica

    2011-01-01

    Before becoming dean of the A. Alfred Taubman College of Architecture and Urban Planning at the University of Michigan, the author was a professor of architecture at Harvard University where she taught design studio, lecture, and seminar courses on topics including digital technology and the history of design and an introductory course on the…

  12. Deaf Children: Three Ideas for Adapting Current Trends in Mathematics Education.

    ERIC Educational Resources Information Center

    Schroeder, Brenda

    Three lesson plans to adapt mathematics education for middle school students, including deaf students, are presented. The first lesson, "How Do I Identify Myself," teaches students to participate in a survey, conduct a survey, weigh results, convert results to ratios, convert ratios to percentages, construct a circle graph, and write a paragraph…

  13. Pilot production & commercialization of LAPPD ™

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Minot, Michael J.; Bennis, Daniel C.; Bond, Justin L.

    We present a progress update on plans to establish pilot production and commercialization of Large Area (400 cm2) Picosecond Photodetector (LAPPD™). Steps being taken to commercialize this MCP and LAPPD™ technology and begin tile pilot production are presented including (1) the manufacture of 203 mm×203 mm borosilicate glass capillary arrays (GCAs), (2) optimization of MCP performance and creation of an ALD coating facility to manufacture MCPs and (3) design, construction and commissioning of UHV tile integration and sealing facility to produce LAPPDs. Taken together these plans provide a “pathway toward commercialization”.

  14. Estimation of the annual production and composition of C&D Debris in Galicia (Spain).

    PubMed

    Martínez Lage, Isabel; Martínez Abella, Fernando; Herrero, Cristina Vázquez; Ordóñez, Juan Luis Pérez

    2010-04-01

    One of the key aspects that must be taken into consideration within the framework of Sustainable Construction is the management of Construction and Demolition (C&D) Debris. As for other types of waste, specific handling procedures are required to manage C&D Debris; these include reduction, reuse, recycling, and if all other possibilities fail, recovery or disposal. For public planning strategies aimed at the management of C&D Debris to be effective, it is first necessary to have specific knowledge of the type of waste materials generated in a particular region. After verifying that the methods available to determine the production and composition of C&D Debris are limited, this paper presents a procedure to ascertain the production and composition of C&D Debris, in any region. The procedure utilizes data on the surface areas of newly constructed buildings, renovations and demolitions, which are estimated from available data for recent years, as well as information on the quantity of debris generated per surface area in any type of construction site, which is obtained from recently executed constructions or from the ground plans of older buildings. The method proposed here has been applied to Galicia, one of Spain's autonomous communities, for which the quantity and composition of C&D Debris have been estimated for the horizon year 2011. Copyright 2009 Elsevier Ltd. All rights reserved.

  15. The Galaxen model--a concept for rehabilitation and prevention in the construction industry.

    PubMed

    Stenlund, Berndt

    2005-01-01

    The Galaxen model was developed during the late 1980s to provide rehabilitation and prevention activities in the construction industry. It handles around 1200 workers with long-term sick leave or partial disabilities annually, some 10% of whom annually leave Galaxen for an ordinary job without a wage subsidy. The model includes a decision by a rehabilitation board of representatives from the employers, the trade union, and the regional employment office, a rehabilitation plan, allotment of a case manager, wage subsidies from the State to the company, a search for a suitable job in relation to the partial disability. It also includes a preventive program with emphasis on practical ergonomics. The Galaxen model has proved to be a suitable means of rehabilitating construction workers and returning them to the workforce. The model was developed within the Swedish social security system but could well be adjusted to other contexts.

  16. 40 CFR 62.14535 - When must I comply with this subpart if I plan to continue operation of my CISWI unit?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule...) You must submit a waste management plan no later than April 5, 2004. (3) You must achieve final... complete retrofit construction of control devices, as specified in the final control plan, so that, if the...

  17. Optimal allocation model of construction land based on two-level system optimization theory

    NASA Astrophysics Data System (ADS)

    Liu, Min; Liu, Yanfang; Xia, Yuping; Lei, Qihong

    2007-06-01

    The allocation of construction land is an important task in land-use planning. Whether implementation of planning decisions is a success or not, usually depends on a reasonable and scientific distribution method. Considering the constitution of land-use planning system and planning process in China, multiple levels and multiple objective decision problems is its essence. Also, planning quantity decomposition is a two-level system optimization problem and an optimal resource allocation decision problem between a decision-maker in the topper and a number of parallel decision-makers in the lower. According the characteristics of the decision-making process of two-level decision-making system, this paper develops an optimal allocation model of construction land based on two-level linear planning. In order to verify the rationality and the validity of our model, Baoan district of Shenzhen City has been taken as a test case. Under the assistance of the allocation model, construction land is allocated to ten townships of Baoan district. The result obtained from our model is compared to that of traditional method, and results show that our model is reasonable and usable. In the end, the paper points out the shortcomings of the model and further research directions.

  18. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    NASA Astrophysics Data System (ADS)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  19. 51. Roof plans, General Services Administration, Construction Management Division, Region ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Roof plans, General Services Administration, Construction Management Division, Region 2, New York, October 29, 1976. Scale 1/31=1. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY

  20. 35. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. OFFICE OF THE QUARTERMASTER GENERAL; CONSTRUCTION DIVISION; PLAN NUMBER 800-196. MOBILIZATION BUILDINGS; STANDARD HEATING DETAILS; WARM AIR HEATING; SMOKE PIPES & VENT HOODS FOR RANGES. - Fort McCoy, Building T-1129, Sparta, Monroe County, WI

  1. Well Planning and Construction Haynesville Shale - East Texas

    EPA Pesticide Factsheets

    This paper will focus on the well planning and construction techniques Devon uses in the Haynesville Shale. It will briefly cover issues that are related to designing and drilling the well safely and protecting subsurface drinking water sources.

  2. Construction Management: Planning Ahead.

    ERIC Educational Resources Information Center

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  3. Supplement Analysis for the Watershed Management Program Final EIS (DOE EIS /SA-156) - Upper Salmon River Anadromous Fish Passage Improvement Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, Carl J.

    2004-07-13

    BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less

  4. Analysis and preliminary design of Kunming land use and planning management information system

    NASA Astrophysics Data System (ADS)

    Li, Li; Chen, Zhenjie

    2007-06-01

    This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.

  5. Methodology of environmental diagnosis for construction and demolition waste landfills: a tool for planning and making decisions.

    PubMed

    Garrido, E; Calvo, F; Ramos, A F; Zamorano, M

    2005-11-01

    Current legislation in the European Union regarding landfills provides measures, procedures and guidance to prevent or reduce, insofar as possible, negative effects on the environment. This means that Member States must take measures so that landfills cannot operate unless the operator first presents a plan for the site, which includes the implementation of improvements considered necessary by the engineer for compliance with regulations. Researchers at the University of Granada have developed a method to ascertain the degree of environmental impact that a construction and demolition waste landfill may produce on its immediate surroundings. This methodology is based on environmental indexes; its objective is to give crucial information concerning possible environmental problems produced by a landfill. The data thus obtained will permit the elaboration of guidelines for improvements in the location, design, and operation of landfills, or in extreme cases, their dosing, sealing, and rehabilitation.

  6. Atlas-based system for functional neurosurgery

    NASA Astrophysics Data System (ADS)

    Nowinski, Wieslaw L.; Yeo, Tseng T.; Yang, Guo L.; Dow, Douglas E.

    1997-05-01

    This paper addresses the development of an atlas-based system for preoperative functional neurosurgery planning and training, intraoperative support and postoperative analysis. The system is based on Atlas of Stereotaxy of the Human Brain by Schaltenbrand and Wahren used for interactive segmentation and labeling of clinical data in 2D/3D, and for assisting stereotactic targeting. The atlas microseries are digitized, enhanced, segmented, labeled, aligned and organized into mutually preregistered atlas volumes 3D models of the structures are also constructed. The atlas may be interactively registered with the actual patient's data. Several other features are also provided including data reformatting, visualization, navigation, mensuration, and stereotactic path display and editing in 2D/3D. The system increases the accuracy of target definition, reduces the time of planning and time of the procedure itself. It also constitutes a research platform for the construction of more advanced neurosurgery supporting tools and brain atlases.

  7. Construction and Utilization of a Beowulf Computing Cluster: A User's Perspective

    NASA Technical Reports Server (NTRS)

    Woods, Judy L.; West, Jeff S.; Sulyma, Peter R.

    2000-01-01

    Lockheed Martin Space Operations - Stennis Programs (LMSO) at the John C Stennis Space Center (NASA/SSC) has designed and built a Beowulf computer cluster which is owned by NASA/SSC and operated by LMSO. The design and construction of the cluster are detailed in this paper. The cluster is currently used for Computational Fluid Dynamics (CFD) simulations. The CFD codes in use and their applications are discussed. Examples of some of the work are also presented. Performance benchmark studies have been conducted for the CFD codes being run on the cluster. The results of two of the studies are presented and discussed. The cluster is not currently being utilized to its full potential; therefore, plans are underway to add more capabilities. These include the addition of structural, thermal, fluid, and acoustic Finite Element Analysis codes as well as real-time data acquisition and processing during test operations at NASA/SSC. These plans are discussed as well.

  8. Planning in context: A situated view of children's management of science projects

    NASA Astrophysics Data System (ADS)

    Marshall, Susan Katharine

    This study investigated children's collaborative planning of a complex, long-term software design project. Using sociocultural methods, it examined over time the development of design teams' planning negotiations and tools to document the coconstruction of cultural frameworks to organize teams' shared understanding of what and how to plan. Results indicated that student teams developed frameworks to address a set of common planning functions that included design planning, project metaplanning (things such as division of labor or sharing of computer resources) and team collaboration management planning. There were also some between-team variations in planning frameworks, within a bandwidth of options. Teams engaged in opportunistic planning, which reflected shifts in strategies in response to new circumstances over time. Team members with past design project experience ("oldtimers") demonstrated the transfer of their planning framework to the current design task, and they supported the developing participation of "newcomers." Teams constructed physical tools (e.g. planning boards) that acted as visual representations of teams' planning frameworks, and inscriptions of team thinking. The assigned functions of the tools also shifted over time with changing project circumstances. The discussion reexamines current approaches to the study of planning and discusses their educational implications.

  9. 34. Photographic copy of original construction plan (Wabasha Street Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Photographic copy of original construction plan (Wabasha Street Bridge, Cantilever Span 1888); web details of cantilever arm connecting first span to first pier - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  10. Exploring motivations to seek and undergo prosthodontic care: an empirical approach using the Theory of Planned Behavior construct

    PubMed Central

    Vieira, Antonio Hélio; Leles, Cláudio Rodrigues

    2014-01-01

    Motivations for seeking and undergoing prosthodontic care are poorly understood and are not often explored for clinical purposes when determining treatment need and understanding the factors related to the demand for health care and effective use. This article uses the Theory of Planned Behavior construct to identify factors related to the motivations of edentulous subjects to seek and undergo prosthodontic treatment. The conceptual framework of the Theory of Planned Behavior includes attitude toward behavior, an individual’s positive or negative evaluation of self-performance of the particular behavior; the subjective norm, an individual’s perception of social normative pressures or relevant others’ beliefs that he or she should or should not perform such behavior; and perceived behavioral control, or an individual’s perceived ease or difficulty in performing the particular behavior, determined by the total set of accessible control beliefs. These components mediate a subject’s intention and behavior toward an object and may also explain health-related behaviors, providing strong predictions across a range of health behaviors. This study suggests categories for each component of the Theory of Planned Behavior, based on clinical evidence and practical reasoning. Attitudes toward behavior include perceived consequences of no treatment, perceived potential benefits and risks of treatment, dental anxiety, previous experiences, and interpersonal abilities of the health care providers. The subjective norm includes the opinions of relevant others, advertisement, professionally defined normative need, perceived professional skills, and technical quality of care. Perceived behavioral control includes subject’s time, availability and opportunity, treatment costs, subject’s perceived need, and accessibility to dental care. This conceptual model represents a theoretical multidimensional model that may help clinicians better understand the patient’s treatment behaviors and provide additional information for clinical research on patient’s adherence to interventions in prosthodontics. PMID:25246777

  11. LSST telescope and site status

    NASA Astrophysics Data System (ADS)

    Gressler, William J.

    2016-07-01

    The Large Synoptic Survey Telescope (LSST) Project1 received its construction authorization from the National Science Foundation in August 2014. The Telescope and Site (T and S) group has made considerable progress towards completion in subsystems required to support the scope of the LSST science mission. The LSST goal is to conduct a wide, fast, deep survey via a 3-mirror wide field of view optical design, a 3.2-Gpixel camera, and an automated data processing system. The summit facility is currently under construction on Cerro Pachón in Chile, with major vendor subsystem deliveries and integration planned over the next several years. This paper summarizes the status of the activities of the T and S group, tasked with design, analysis, and construction of the summit and base facilities and infrastructure necessary to control the survey, capture the light, and calibrate the data. All major telescope work package procurements have been awarded to vendors and are in varying stages of design and fabrication maturity and completion. The unique M1M3 primary/tertiary mirror polishing effort is completed and the mirror now resides in storage waiting future testing. Significant progress has been achieved on all the major telescope subsystems including the summit facility, telescope mount assembly, dome, hexapod and rotator systems, coating plant, base facility, and the calibration telescope. In parallel, in-house efforts including the software needed to control the observatory such as the scheduler and the active optics control, have also seen substantial advancement. The progress and status of these subsystems and future LSST plans during this construction phase are presented.

  12. Variable speed gas engine-driven air compressor system

    NASA Astrophysics Data System (ADS)

    Morgan, J. R.; Ruggles, A. E.; Chen, T. N.; Gehret, J.

    1992-11-01

    Tecogen Inc. and Ingersoll-Rand Co. as a subcontractor have designed a nominal 150-hp gas engine-driven air compressor utilizing the TECODRIVE 8000 engine and the Ingersoll-Rand 178.5-mm twin screw compressor. Phase 1 included the system engineering and design, economic and applications studies, and a draft commercialization plan. Phase 2 included controls development, laboratory prototype construction, and performance testing. The testing conducted verified that the compressor meets all design specifications.

  13. 17. Photographic copy of intial site plan for North Base: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photographic copy of intial site plan for North Base: AF Job No. 1045, Military Construction: Muroc Bombing Range, Muroc Lake, California; Materiel Test Site: Location Plan, Sheet No. 1 of 11, May 1942. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  14. Breastfeeding Duration and the Theory of Planned Behavior and Breastfeeding Self-Efficacy Framework: A Systematic Review of Observational Studies.

    PubMed

    Lau, Christine Y K; Lok, Kris Y W; Tarrant, Marie

    2018-03-01

    Introduction Numerous studies have shown that the constructs of the Theory of Reasoned Action (TRA), Theory of Planned Behavior (TPB) and Breastfeeding Self-Efficacy (BSE) Framework can effectively identify relationships between maternal psychosocial factors and breastfeeding initiation. However, the ability of these theories to predict breastfeeding duration has not been adequately analyzed. The aim of the review was to examine the utility of the constructs of TRA/TPB and BSE to predict breastfeeding duration. Methods We conducted a literature search using Pubmed (1980-May 2015), Medline (1966-May 2015), CINAHL (1980-May 2015), EMBASE (1980-May 2015) and PsycINFO (1980-May 2015). We selected studies that were observational studies without randomization or blinding, using TRA, TPB or BSE as the framework for analysis. Only studies reporting on breastfeeding duration were included. Results Thirty studies were selected, which include four using TRA, 10 using TPB, 15 using BSE and one using a combination of TPB and BSE. Maternal intention and breastfeeding self-efficacy were found to be important predictors of breastfeeding duration. Inconsistent findings were found in assessing the relationship between maternal attitudes, subjective norms, perceived behavior control and breastfeeding duration. Discussion The inadequacy of these constructs in explaining breastfeeding duration indicates a need to further explore the role of maternal self-determination in breastfeeding behavior.

  15. An empirical analysis of strategy implementation process and performance of construction companies

    NASA Astrophysics Data System (ADS)

    Zaidi, F. I.; Zawawi, E. M. A.; Nordin, R. M.; Ahnuar, E. M.

    2018-02-01

    Strategy implementation is known as action stage where it is to be considered as the most difficult stage in strategic planning. Strategy implementation can influence the whole texture of a company including its performance. The aim of this research is to provide the empirical relationship between strategy implementation process and performance of construction companies. This research establishes the strategy implementation process and how it influences the performance of construction companies. This research used quantitative method approached via questionnaire survey. Respondents were G7 construction companies in Klang Valley, Selangor. Pearson correlation analysis indicate a strong positive relationship between strategy implementation process and construction companies’ performance. The most importance part of strategy implementation process is to provide sufficient training for employees which directly influence the construction companies’ profit growth and employees’ growth. This research results will benefit top management in the construction companies to conduct strategy implementation in their companies. This research may not reflect the whole construction industry in Malaysia. Future research may be resumed to small and medium grades contractors and perhaps in other areas in Malaysia.

  16. Correlation of causal factors that influence construction safety performance: A model.

    PubMed

    Rodrigues, F; Coutinho, A; Cardoso, C

    2015-01-01

    The construction sector has presented positive development regarding the decrease in occupational accident rates in recent years. Regardless, the construction sector stands out systematically from other industries due to its high number of fatalities. The aim of this paper is to deeply understand the causality of construction accidents from the early design phase through a model. This study reviewed several research papers presenting various analytical models that correlate the contributing factors to occupational accidents in this sector. This study also analysed different construction projects and conducted a survey of design and site supervision teams. This paper proposes a model developed from the analysis of existing ones, which correlates the causal factors through all the construction phases. It was concluded that effective risk prevention can only be achieved by a global correlation of causal factors including not only production ones but also client requirements, financial climate, design team competence, project and risk management, financial capacity, health and safety policy and early planning. Accordingly, a model is proposed.

  17. Economic efficiency of high-rise construction in the Moscow program of renovation of housing stock

    NASA Astrophysics Data System (ADS)

    Misailovov, Andrey

    2018-03-01

    The article considers a new initiative of the regional authorities of updating the housing stock designated as the renovation of housing. Its main aspects are analyzed, including the nature of program, economic efficiency of its implementation due to high-rise construction and the regulatory and legislative framework, the procedure for implementing the program, and the time frame for its implementation. The role of the program for regions in which high depreciation of the housing stock is combined with a limited number of sites for a new housing construction is disclosed. The high-rise construction in the renovation program is presented as a variant of a successful solution not only of the tasks of renovating the housing stock, but also of filling the regional budget. The social and economic orientation of the high-rise construction and the involvement of residents in the process of making town-planning decisions in the field of high-rise construction at all stages of implementing the program are shown.

  18. A lunar construction shack vehicle: Final design

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A lunar construction shack vehicle is a critical component in most of the plans proposed for the construction of a permanent base on the moon. The Selene Engineering Company (SEC) has developed a concept for this vehicle which is both innovative and practical. The design makes use of the most advanced technology available to meet the goals for a safe, versatile and durable habitat that will serve as a starting point for the initial phase of the construction of a permanent lunar base. This document outlines SEC's proposed design for a lander vehicle which will be fully self-sufficient and will provide for all necessary life support, including consumables and radiation protection, needed by the construction crew until they can complete the assembly of a more permanent habitat. Since it is highly likely that it will take more than one crew to complete the construction of a permanent lunar base, the design emphasis is on systems which can be easily maintained and resupplied and which will take a minimum of start up preparation by succeeding crews.

  19. Law, ethics and pandemic preparedness: the importance of cross-jurisdictional and cross-cultural perspectives.

    PubMed

    Bennett, Belinda; Carney, Terry

    2010-04-01

    To explore social equity, health planning, regulatory and ethical dilemmas in responding to a pandemic influenza (H5N1) outbreak, and the adequacy of protocols and standards such as the International Health Regulations (2005). This paper analyses the role of legal and ethical considerations for pandemic preparedness, including an exploration of the relevance of cross-jurisdictional and cross-cultural perspectives in assessing the validity of goals for harmonisation of laws and policies both within and between nations. Australian and international experience is reviewed in various areas, including distribution of vaccines during a pandemic, the distribution of authority between national and local levels of government, and global and regional equity issues for poorer countries. This paper finds that questions such as those of distributional justice (resource allocation) and regulatory frameworks raise important issues about the cultural and ethical acceptability of planning measures. Serious doubt is cast on a 'one size fits all' approach to international planning for managing a pandemic. It is concluded that a more nuanced approach than that contained in international guidelines may be required if an effective response is to be constructed internationally. The paper commends the wisdom of reliance on 'soft law', international guidance that leaves plenty of room for each nation to construct its response in conformity with its own cultural and value requirements. © 2010 The Authors. Journal Compilation © 2010 Public Health Association of Australia.

  20. Posttraumatic stress disorder and suicidal ideation, plans, and impulses: The mediating role of anxiety sensitivity cognitive concerns among veterans.

    PubMed

    Raines, Amanda M; Capron, Daniel W; Stentz, Lauren A; Walton, Jessica L; Allan, Nicholas P; McManus, Eliza S; Uddo, Madeline; True, Gala; Franklin, C Laurel

    2017-11-01

    Although the relationship between posttraumatic stress disorder (PTSD) and suicide has been firmly established, research on underlying mechanisms has been disproportionately low. The cognitive concerns subscale of anxiety sensitivity (AS), which reflects fears of cognitive dyscontrol, has been linked to both PTSD and suicide and thus may serve as an explanatory mechanism between these constructs. The sample consisted of 60 male veterans presenting to an outpatient Veteran Affairs (VA) clinic for psychological services. Upon intake, veterans completed a diagnostic interview and brief battery of self-report questionnaires to assist with differential diagnosis and treatment planning. Results revealed a significant association between PTSD symptom severity and higher suicidality (i.e., ideation, plans, and impulses), even after accounting for relevant demographic and psychological constructs. Moreover, AS cognitive concerns mediated this association. Limitations include the small sample size and cross-sectional nature of the current study. These findings add considerably to a growing body of literature examining underlying mechanisms that may help to explain the robust associations between PTSD and suicide. Considering the malleable nature of AS cognitive concerns, research is needed to determine the extent to which reductions in this cognitive risk factor are associated with reductions in suicide among at risk samples, such as those included in the present investigation. Published by Elsevier B.V.

  1. 26 CFR 1.42-17 - Qualified allocation plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-17 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY INCOME TAX INCOME TAXES Credits Against Tax § 1.42-17 Qualified allocation plan. (a) Requirements—(1) In general. [Reserved] (2..., real estate taxes during construction, title and recording fees, construction period interest...

  2. 44. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. GROUND FLOOR PLAN; SHEET NO. 2 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  3. 38. Photographic copy of original construction plan (Wabasha Street Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photographic copy of original construction plan (Wabasha Street Bridge, Detail of South Cantilever Arm, 1888); web details of cantilever arm connecting second pier to third span - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN

  4. FIRE STATION AND GUARD HOUSE, ELEVATIONS, SECTIONS, AND DETAILS. Plan ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FIRE STATION AND GUARD HOUSE, ELEVATIONS, SECTIONS, AND DETAILS. Plan No. 6754-320, dated August 1, 1933. Constructing Division, Office of the Constructing Quartermaster - Hamilton Field, Fire Station & Guard House, Southwest corner of Seventh Street & Hangar Avenue, Novato, Marin County, CA

  5. Compressive strength of concrete and mortar containing fly ash

    DOEpatents

    Liskowitz, J.W.; Wecharatana, M.; Jaturapitakkul, C.; Cerkanowicz, A.E.

    1997-04-29

    The present invention relates to concrete, mortar and other hardenable mixtures comprising cement and fly ash for use in construction. The invention includes a method for predicting the compressive strength of such a hardenable mixture, which is very important for planning a project. The invention also relates to hardenable mixtures comprising cement and fly ash which can achieve greater compressive strength than hardenable mixtures containing only concrete over the time period relevant for construction. In a specific embodiment, a formula is provided that accurately predicts compressive strength of concrete containing fly ash out to 180 days. In other specific examples, concrete and mortar containing about 15% to 25% fly ash as a replacement for cement, which are capable of meeting design specifications required for building and highway construction, are provided. Such materials can thus significantly reduce construction costs. 33 figs.

  6. Compressive strength of concrete and mortar containing fly ash

    DOEpatents

    Liskowitz, J.W.; Wecharatana, M.; Jaturapitakkul, C.; Cerkanowicz, A.E.

    1998-12-29

    The present invention relates to concrete, mortar and other hardenable mixtures comprising cement and fly ash for use in construction. The invention includes a method for predicting the compressive strength of such a hardenable mixture, which is very important for planning a project. The invention also relates to hardenable mixtures comprising cement and fly ash which can achieve greater compressive strength than hardenable mixtures containing only concrete over the time period relevant for construction. In a specific embodiment, a formula is provided that accurately predicts compressive strength of concrete containing fly ash out to 180 days. In other specific examples, concrete and mortar containing about 15% to 25% fly ash as a replacement for cement, which are capable of meeting design specification required for building and highway construction, are provided. Such materials can thus significantly reduce construction costs. 33 figs.

  7. Compressive strength of concrete and mortar containing fly ash

    DOEpatents

    Liskowitz, John W.; Wecharatana, Methi; Jaturapitakkul, Chai; Cerkanowicz, deceased, Anthony E.

    1997-01-01

    The present invention relates to concrete, mortar and other hardenable mixtures comprising cement and fly ash for use in construction. The invention includes a method for predicting the compressive strength of such a hardenable mixture, which is very important for planning a project. The invention also relates to hardenable mixtures comprising cement and fly ash which can achieve greater compressive strength than hardenable mixtures containing only concrete over the time period relevant for construction. In a specific embodiment, a formula is provided that accurately predicts compressive strength of concrete containing fly ash out to 180 days. In other specific examples, concrete and mortar containing about 15% to 25% fly ash as a replacement for cement, which are capable of meeting design specifications required for building and highway construction, are provided. Such materials can thus significantly reduce construction costs.

  8. Compressive strength of concrete and mortar containing fly ash

    DOEpatents

    Liskowitz, John W.; Wecharatana, Methi; Jaturapitakkul, Chai; Cerkanowicz, deceased, Anthony E.

    1998-01-01

    The present invention relates to concrete, mortar and other hardenable mixtures comprising cement and fly ash for use in construction. The invention includes a method for predicting the compressive strength of such a hardenable mixture, which is very important for planning a project. The invention also relates to hardenable mixtures comprising cement and fly ash which can achieve greater compressive strength than hardenable mixtures containing only concrete over the time period relevant for construction. In a specific embodiment, a formula is provided that accurately predicts compressive strength of concrete containing fly ash out to 180 days. In other specific examples, concrete and mortar containing about 15% to 25% fly ash as a replacement for cement, which are capable of meeting design specification required for building and highway construction, are provided. Such materials can thus significantly reduce construction costs.

  9. Summary of NASA Lewis Research Center solar heating and cooling and wind energy programs

    NASA Technical Reports Server (NTRS)

    Vernon, R. W.

    1975-01-01

    Plans for the construction and operation of a solar heating and cooling system in conjunction with a office building being constructed at Langley Research Center, are discussed. Supporting research and technology includes: testing of solar collectors with a solar simulator, outdoor testing of collectors, property measurements of selective and nonselective coatings for solar collectors, and a solar model-systems test loop. The areas of a wind energy program that are being conducted include: design and operation of a 100-kW experimental wind generator, industry-designed and user-operated wind generators in the range of 50 to 3000 kW, and supporting research and technology for large wind energy systems. An overview of these activities is provided.

  10. Civil Society Advocacy for Construction of Education Legislation in Brazil: Education Diplomacy in a National Network

    ERIC Educational Resources Information Center

    Cara, Daniel; Pellanda, Andressa

    2018-01-01

    Advocacy efforts often contribute to broader Education Diplomacy goals. The Brazilian Campaign for the Right to Education coordinated an effort among diverse civil society stakeholders to ensure their voice was included in developing Brazil's National Education Plan (NEP). As a result of their advocacy strategy, civil society participated in…

  11. Constructing Education as Human Capital in a Transitional Society: A Case Study of Somaliland's Education Reconstruction

    ERIC Educational Resources Information Center

    Ahmed, Hassan; Bradford, Simon

    2011-01-01

    The purpose of this article is to critically examine Somaliland's post-conflict education reconstruction. The work includes documentary analysis of the Somaliland Education Policy. The authors also draw on the National Teacher Education Policy and the Somaliland National Education Development Plan. The analysis of these documents is primarily…

  12. Developing Better Methods for Obtaining Long-Term (Debt) Financing for Expansion of Physical Facilities at Small, Nonprofit, Traditional Midwestern Colleges.

    ERIC Educational Resources Information Center

    Westin, Charles A.

    This research explored the problem of private colleges borrowing money to pay for construction of needed buildings. The study revealed that most colleges had borrowed money in the past for construction. About two-thirds of those foresaw further construction, and one-half of those who planned to build also planned to borrow to meet part of the cost…

  13. 25 CFR 170.500 - What program reviews do the Secretaries conduct?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Section 170.500 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... planning; (3) Design; (4) Contract administration; (5) Construction; (6) Financial management; and (7...

  14. 45. Photograph of an original construction drawing, dated August 1927, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. FIRST FLOOR PLAN AND DETAILS; SHEET NO. 3 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA

  15. 18. Photographic copy of site plan for additions to North ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photographic copy of site plan for additions to North Base: Job No. Muroc A(511), Military Construction, Third District Region, San Bernardino, California; Muroc Bombing Range, Muroc Lake, Calif; Additional Temporary Construction, Materiel Center Flight Test Base, Location Plan, February 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  16. Intelligent Agent Architectures: Reactive Planning Testbed

    NASA Technical Reports Server (NTRS)

    Rosenschein, Stanley J.; Kahn, Philip

    1993-01-01

    An Integrated Agent Architecture (IAA) is a framework or paradigm for constructing intelligent agents. Intelligent agents are collections of sensors, computers, and effectors that interact with their environments in real time in goal-directed ways. Because of the complexity involved in designing intelligent agents, it has been found useful to approach the construction of agents with some organizing principle, theory, or paradigm that gives shape to the agent's components and structures their relationships. Given the wide variety of approaches being taken in the field, the question naturally arises: Is there a way to compare and evaluate these approaches? The purpose of the present work is to develop common benchmark tasks and evaluation metrics to which intelligent agents, including complex robotic agents, constructed using various architectural approaches can be subjected.

  17. Preoperative Planning in Orthopaedic Surgery. Current Practice and Evolving Applications.

    PubMed

    Atesok, Kivanc; Galos, David; Jazrawi, Laith M; Egol, Kenneth A

    2015-12-01

    Preoperative planning is an essential prerequisite for the success of orthopaedic procedures. Traditionally, the exercise has involved the written down, step by step "blueprint" of the surgical procedure. Preoperative planning of the technical aspects of the orthopaedic procedure has been performed on hardcopy radiographs using various methods such as copying the radiographic image on tracing papers to practice the planned interventions. This method has become less practical due to variability in radiographic magnification and increasing implementation of digital imaging systems. Advances in technology along with recognition of the importance of surgical safety protocols resulted in widespread changes in orthopaedic preoperative planning approaches. Nowadays, perioperative "briefings" have gained particular importance and novel planning methods have started to integrate into orthopaedic practice. These methods include using software that enables surgeons to perform preoperative planning on digital radiographs and to construct 3D digital models or prototypes of various orthopaedic pathologies from a patient's CT scans to practice preoperatively. Evidence-to-date suggests that preoperative planning and briefings are effective means of favorably influencing the outcomes of orthopaedic procedures.

  18. Research on optimal investment path of transmission corridor under the global energy Internet

    NASA Astrophysics Data System (ADS)

    Huang, Yuehui; Li, Pai; Wang, Qi; Liu, Jichun; Gao, Han

    2018-02-01

    Under the background of the global energy Internet, the investment planning of transmission corridor from XinJiang to Germany is studied in this article, which passes through four countries: Kazakhstan, Russia, Belarus and Poland. Taking the specific situation of different countries into account, including the length of transmission line, unit construction cost, completion time, transmission price, state tariff, inflation rate and so on, this paper constructed a power transmission investment model. Finally, the dynamic programming method is used to simulate the example, and the optimal strategies under different objective functions are obtained.

  19. Construction of a New Fire Station, Demolition of Buildings 530 and 606 and Relocation of the Hazardous Cargo Area at Grand Forks Air Force Base, North Dakota. Finding of No Significant Impact (FOSNI). Finding of No Practical Alternative(FONPA)

    DTIC Science & Technology

    2009-09-23

    hawthorn, buffaloberry and snowberry also are found in the area. In wetland areas, predominant species include Typha sp., smartweed, wild millet, cord...does not straddle the airfield flight line fence. This location will require wetland mitigation for 0.03 wetlands determined to be jurisdictional by... wetlands construction or restoration at either a wetland mitigation bank or a suitable location on base. A formal mitigation plan will be developed

  20. The Global Experience of Deployment of Energy-Efficient Technologies in High-Rise Construction

    NASA Astrophysics Data System (ADS)

    Potienko, Natalia D.; Kuznetsova, Anna A.; Solyakova, Darya N.; Klyueva, Yulia E.

    2018-03-01

    The objective of this research is to examine issues related to the increasing importance of energy-efficient technologies in high-rise construction. The aim of the paper is to investigate modern approaches to building design that involve implementation of various energy-saving technologies in diverse climates and at different structural levels, including the levels of urban development, functionality, planning, construction and engineering. The research methodology is based on the comprehensive analysis of the advanced global expertise in the design and construction of energy-efficient high-rise buildings, with the examination of their positive and negative features. The research also defines the basic principles of energy-efficient architecture. Besides, it draws parallels between the climate characteristics of countries that lead in the field of energy-efficient high-rise construction, on the one hand, and the climate in Russia, on the other, which makes it possible to use the vast experience of many countries, wholly or partially. The paper also gives an analytical review of the results arrived at by implementing energy efficiency principles into high-rise architecture. The study findings determine the impact of energy-efficient technologies on high-rise architecture and planning solutions. In conclusion, the research states that, apart from aesthetic and compositional interpretation of architectural forms, an architect nowadays has to address the task of finding a synthesis between technological and architectural solutions, which requires knowledge of advanced technologies. The study findings reveal that the implementation of modern energy-efficient technologies into high-rise construction is of immediate interest and is sure to bring long-term benefits.

Top