Sample records for pointed termination operated

  1. Airport Airside System Model

    DOT National Transportation Integrated Search

    1971-06-01

    The model of an airport airside system simulates aircraft operations and controller functions in the terminal area, both in the air and on the ground. The model encompasses all operations between the terminal gate and the point of handoff between the...

  2. Concept of Operations for Interval Management Arrivals and Approach

    NASA Technical Reports Server (NTRS)

    Hicok, Daniel S.; Barmore, Bryan E.

    2016-01-01

    This paper presents the concept of operations for interval management operations to be deployed in the US National Airspace System (NAS) by the Federal Aviation Administration (FAA) Interval Management Program. The arrivals and approach operations are explored in detail including the primary operation and variations. The use of interval management operations is described that begin in en route airspace and continue to a termination point inside the arrival terminal area in the highly automated terminal environment that includes other arrival management tools such as arrival metering, Ground-based Interval Management - Spacing (GIM-S), and Terminal Sequencing and Spacing (TSAS). The roles of Air Traffic and Pilots and the ground automation tools that are used by Air Traffic Controllers to enable the operations are explored.

  3. Concept of Operations for Interval Management Arrivals and Approach

    NASA Technical Reports Server (NTRS)

    Hicok, Daniel S.; Barmore, Bryan E.

    2016-01-01

    This paper presents the concept of operations for interval management operations to be deployed in the US National Airspace System (NAS) by the Federal Aviation Administration (FAA) after 2020. The use of interval management operations is described that begin in en route airspace and continue to a termination point inside the arrival terminal area, in a terminal environment that includes other arrival management tools such as arrival metering, Ground-based Interval Management - Spacing (GIM-S), and Terminal Sequencing and Spacing (TSAS). The roles of Air Traffic Controllers and Flight Crews and the ground automation tools that are used by Air Traffic Controllers to enable the primary operation and variations are described.

  4. Optimal Trajectories for the Helicopter in One-Engine-Inoperative Terminal-Area Operations

    NASA Technical Reports Server (NTRS)

    Zhao, Yiyuan; Chen, Robert T. N.

    1996-01-01

    This paper presents a summary of a series of recent analytical studies conducted to investigate One-Engine-Inoperative (OEI) optimal control strategies and the associated optimal trajectories for a twin engine helicopter in Category-A terminal-area operations. These studies also examine the associated heliport size requirements and the maximum gross weight capability of the helicopter. Using an eight states, two controls, augmented point-mass model representative of the study helicopter, Continued TakeOff (CTO), Rejected TakeOff (RTO), Balked Landing (BL), and Continued Landing (CL) are investigated for both Vertical-TakeOff-and-Landing (VTOL) and Short-TakeOff-and-Landing (STOL) terminal-area operations. The formulation of the nonlinear optimal control problems with considerations for realistic constraints, solution methods for the two-point boundary-value problem, a new real-time generation method for the optimal OEI trajectories, and the main results of this series of trajectory optimization studies are presented. In particular, a new balanced- weight concept for determining the takeoff decision point for VTOL Category-A operations is proposed, extending the balanced-field length concept used for STOL operations.

  5. Air Traffic Management Technology Demonstration-1 Concept of Operations (ATD-1 ConOps), Version 2.0

    NASA Technical Reports Server (NTRS)

    Baxley, Brian T.; Johnson, William C.; Swenson, Harry N.; Robinson, John E.; Prevot, Tom; Callantine, Todd J.; Scardina, John; Greene, Michael

    2013-01-01

    This document is an update to the operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) integrates three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to the Final Approach Fix. These arrival streams are Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and their implantation into an operational environment. The ATD-1 goals include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

  6. NASA's ATM Technology Demonstration-1: Integrated Concept of Arrival Operations

    NASA Technical Reports Server (NTRS)

    Baxley, Brian T.; Swenson, Harry N.; Prevot, Thomas; Callantine, Todd J.

    2012-01-01

    This paper describes operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) demonstration will integrate three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to touchdown. It also enables aircraft to conduct Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and implantation into an operational environment. Goals of the ATD-1 demonstration include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

  7. An enhanced SOCP-based method for feeder load balancing using the multi-terminal soft open point in active distribution networks

    DOE PAGES

    Ji, Haoran; Wang, Chengshan; Li, Peng; ...

    2017-09-20

    The integration of distributed generators (DGs) exacerbates the feeder power flow fluctuation and load unbalanced condition in active distribution networks (ADNs). The unbalanced feeder load causes inefficient use of network assets and network congestion during system operation. The flexible interconnection based on the multi-terminal soft open point (SOP) significantly benefits the operation of ADNs. The multi-terminal SOP, which is a controllable power electronic device installed to replace the normally open point, provides accurate active and reactive power flow control to enable the flexible connection of feeders. An enhanced SOCP-based method for feeder load balancing using the multi-terminal SOP is proposedmore » in this paper. Furthermore, by regulating the operation of the multi-terminal SOP, the proposed method can mitigate the unbalanced condition of feeder load and simultaneously reduce the power losses of ADNs. Then, the original non-convex model is converted into a second-order cone programming (SOCP) model using convex relaxation. In order to tighten the SOCP relaxation and improve the computation efficiency, an enhanced SOCP-based approach is developed to solve the proposed model. Finally, case studies are performed on the modified IEEE 33-node system to verify the effectiveness and efficiency of the proposed method.« less

  8. An enhanced SOCP-based method for feeder load balancing using the multi-terminal soft open point in active distribution networks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ji, Haoran; Wang, Chengshan; Li, Peng

    The integration of distributed generators (DGs) exacerbates the feeder power flow fluctuation and load unbalanced condition in active distribution networks (ADNs). The unbalanced feeder load causes inefficient use of network assets and network congestion during system operation. The flexible interconnection based on the multi-terminal soft open point (SOP) significantly benefits the operation of ADNs. The multi-terminal SOP, which is a controllable power electronic device installed to replace the normally open point, provides accurate active and reactive power flow control to enable the flexible connection of feeders. An enhanced SOCP-based method for feeder load balancing using the multi-terminal SOP is proposedmore » in this paper. Furthermore, by regulating the operation of the multi-terminal SOP, the proposed method can mitigate the unbalanced condition of feeder load and simultaneously reduce the power losses of ADNs. Then, the original non-convex model is converted into a second-order cone programming (SOCP) model using convex relaxation. In order to tighten the SOCP relaxation and improve the computation efficiency, an enhanced SOCP-based approach is developed to solve the proposed model. Finally, case studies are performed on the modified IEEE 33-node system to verify the effectiveness and efficiency of the proposed method.« less

  9. 75 FR 20591 - AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC; Notice of Final General Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... quality impacts associated with the construction and operation of a liquefied natural gas (LNG) import terminal and natural gas pipeline proposed by AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC, in... of the following LNG terminal and natural gas pipeline facilities: A ship unloading facility, with...

  10. Terminal Sliding Modes In Nonlinear Control Systems

    NASA Technical Reports Server (NTRS)

    Venkataraman, Subramanian T.; Gulati, Sandeep

    1993-01-01

    Control systems of proposed type called "terminal controllers" offers increased precision and stability of robotic operations in presence of unknown and/or changing parameters. Systems include special computer hardware and software implementing novel control laws involving terminal sliding modes of motion: closed-loop combination of robot and terminal controller converge, in finite time, to point of stable equilibrium in abstract space of velocity and/or position coordinates applicable to particular control problem.

  11. Terminal attractors in neural networks

    NASA Technical Reports Server (NTRS)

    Zak, Michail

    1989-01-01

    A new type of attractor (terminal attractors) for content-addressable memory, associative memory, and pattern recognition in artificial neural networks operating in continuous time is introduced. The idea of a terminal attractor is based upon a violation of the Lipschitz condition at a fixed point. As a result, the fixed point becomes a singular solution which envelopes the family of regular solutions, while each regular solution approaches such an attractor in finite time. It will be shown that terminal attractors can be incorporated into neural networks such that any desired set of these attractors with prescribed basins is provided by an appropriate selection of the synaptic weights. The applications of terminal attractors for content-addressable and associative memories, pattern recognition, self-organization, and for dynamical training are illustrated.

  12. 78 FR 2482 - Carload Express, Inc.-Continuance in Control Exemption-Ohio Terminal Railway Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ... exemption in Ohio Terminal Railway Company--Operation Exemption-- Hannibal Real Estate, LLC, Docket No. FD..., from milepost 60.5 at or near Powhatan Point, to milepost 72.7 at or near Hannibal, in Monroe County...

  13. Increasing supplemental nutrition assistance program/electronic benefits transfer sales at farmers' markets with vendor-operated wireless point-of-sale terminals.

    PubMed

    Buttenheim, Alison M; Havassy, Joshua; Fang, Michelle; Glyn, Jonathan; Karpyn, Allison E

    2012-05-01

    Supplemental Nutrition Assistance Program (SNAP) (formerly Food Stamp Program) participants can use their benefits at many farmers' markets. However, most markets have only one market-operated wireless point-of-sale (POS) card swipe terminal for electronic benefits transfer (EBT) transactions. It is not known whether providing each farmer/vendor with individual wireless POS terminals and subsidizing EBT fees will increase SNAP/EBT purchases at farmers' markets. To evaluate the effects of multiple vendor-operated wireless POS terminals (vs a single market-operated terminal) on use of SNAP benefits at an urban farmers' market. Time-series analyses of SNAP/EBT sales. The Clark Park farmers' market in West Philadelphia, PA, which accounts for one quarter of all SNAP/EBT sales at farmers' markets in Pennsylvania. Vendors were provided with individual wireless POS terminals for 9 months (June 2008-February 2009.) The pilot program covered all equipment and wireless service costs and transaction fees associated with SNAP/EBT, credit, and debit sales. Monthly SNAP/EBT sales at the Clark Park farmers' market. SNAP/EBT sales data were collected for 48 months (January 2007-December 2010). Time-series regression analysis was used to estimate the effect of the intervention period (June 2008-February 2009) on SNAP/EBT sales, controlling for seasonal effects and total SNAP benefits issued in Philadelphia. The intervention was associated with a 38% increase in monthly SNAP/EBT sales. Effects were greatest during the busy fall market seasons. SNAP/EBT sales did not remain significantly higher after the intervention period. Providing individual wireless POS terminals to farmers' market vendors leads to increased sales. However, market vendors indicated that subsidies for equipment costs and fees would be needed to break even. Currently, SNAP provides some support for these services for supermarket and other SNAP retailers with landline access, but not for farmers' markets. Copyright © 2012 Academy of Nutrition and Dietetics. Published by Elsevier Inc. All rights reserved.

  14. Intelligent energy harvesting scheme for microbial fuel cells: Maximum power point tracking and voltage overshoot avoidance

    NASA Astrophysics Data System (ADS)

    Alaraj, Muhannad; Radenkovic, Miloje; Park, Jae-Do

    2017-02-01

    Microbial fuel cells (MFCs) are renewable and sustainable energy sources that can be used for various applications. The MFC output power depends on its biochemical conditions as well as the terminal operating points in terms of output voltage and current. There exists one operating point that gives the maximum possible power from the MFC, maximum power point (MPP), for a given operating condition. However, this MPP may vary and needs to be tracked in order to maintain the maximum power extraction from the MFC. Furthermore, MFC reactors often develop voltage overshoots that cause drastic drops in the terminal voltage, current, and the output power. When the voltage overshoot happens, an additional control measure is necessary as conventional MPPT algorithms will fail because of the change in the voltage-current relationship. In this paper, the extremum seeking (ES) algorithm was used to track the varying MPP and a voltage overshoot avoidance (VOA) algorithm is developed to manage the voltage overshoot conditions. The proposed ES-MPPT with VOA algorithm was able to extract 197.2 mJ during 10-min operation avoiding voltage overshoot, while the ES MPPT-only scheme stopped harvesting after only 18.75 mJ because of the voltage overshoot happened at 0.4 min.

  15. Embedded parallel processing based ground control systems for small satellite telemetry

    NASA Technical Reports Server (NTRS)

    Forman, Michael L.; Hazra, Tushar K.; Troendly, Gregory M.; Nickum, William G.

    1994-01-01

    The use of networked terminals which utilize embedded processing techniques results in totally integrated, flexible, high speed, reliable, and scalable systems suitable for telemetry and data processing applications such as mission operations centers (MOC). Synergies of these terminals, coupled with the capability of terminal to receive incoming data, allow the viewing of any defined display by any terminal from the start of data acquisition. There is no single point of failure (other than with network input) such as exists with configurations where all input data goes through a single front end processor and then to a serial string of workstations. Missions dedicated to NASA's ozone measurements program utilize the methodologies which are discussed, and result in a multimission configuration of low cost, scalable hardware and software which can be run by one flight operations team with low risk.

  16. JPRS Report, Soviet Union, Foreign Military Review, No. 8, August 1987

    DTIC Science & Technology

    1988-01-28

    Hinkley Point (1.5 million) and Hartlepool (1.3 million). In recent years the country has begun building large hydro- electric pumped storage power ...antenna 6. Interface equipment 7. Data transmission line terminal 8. Computer 9. Power supply plant control station 10. Radio-relay station terminals... stations and data transmission line, interface equipment, and power distribution unit (Fig. 3). The parallel computer, which performs operations on

  17. Fuel dissipater for pressurized fuel cell generators

    DOEpatents

    Basel, Richard A.; King, John E.

    2003-11-04

    An apparatus and method are disclosed for eliminating the chemical energy of fuel remaining in a pressurized fuel cell generator (10) when the electrical power output of the fuel cell generator is terminated during transient operation, such as a shutdown; where, two electrically resistive elements (two of 28, 53, 54, 55) at least one of which is connected in parallel, in association with contactors (26, 57, 58, 59), a multi-point settable sensor relay (23) and a circuit breaker (24), are automatically connected across the fuel cell generator terminals (21, 22) at two or more contact points, in order to draw current, thereby depleting the fuel inventory in the generator.

  18. 33 CFR 161.65 - Vessel Traffic Service Lower Mississippi River.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... provide name and destination, confirm proper operation of their automated identification system (AIS) if... provide name and destination, confirm proper operation of their AIS if required under 33 CFR 164.46, and... Marlex Terminal (Naval Ships) 99.0 AHP 29°54.65′ N; 90°05.87′ W Downbound transiting Algiers Point...

  19. 33 CFR 161.65 - Vessel Traffic Service Lower Mississippi River.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... provide name and destination, confirm proper operation of their automated identification system (AIS) if... provide name and destination, confirm proper operation of their AIS if required under 33 CFR 164.46, and... Marlex Terminal (Naval Ships) 99.0 AHP 29°54.65′ N; 90°05.87′ W Downbound transiting Algiers Point...

  20. 33 CFR 161.65 - Vessel Traffic Service Lower Mississippi River.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... provide name and destination, confirm proper operation of their automated identification system (AIS) if... provide name and destination, confirm proper operation of their AIS if required under 33 CFR 164.46, and... Marlex Terminal (Naval Ships) 99.0 AHP 29°54.65′ N; 90°05.87′ W Downbound transiting Algiers Point...

  1. 33 CFR 161.65 - Vessel Traffic Service Lower Mississippi River.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... provide name and destination, confirm proper operation of their automated identification system (AIS) if... provide name and destination, confirm proper operation of their AIS if required under 33 CFR 164.46, and... Marlex Terminal (Naval Ships) 99.0 AHP 29°54.65′ N; 90°05.87′ W Downbound transiting Algiers Point...

  2. Satellite-based quantum communication terminal employing state-of-the-art technology

    NASA Astrophysics Data System (ADS)

    Pfennigbauer, Martin; Aspelmeyer, Markus; Leeb, Walter R.; Baister, Guy; Dreischer, Thomas; Jennewein, Thomas; Neckamm, Gregor; Perdigues, Josep M.; Weinfurter, Harald; Zeilinger, Anton

    2005-09-01

    Feature Issue on Optical Wireless Communications (OWC) We investigate the design and the accommodation of a quantum communication transceiver in an existing classical optical communication terminal on board a satellite. Operation from a low earth orbit (LEO) platform (e.g., the International Space Station) would allow transmission of single photons and pairs of entangled photons to ground stations and hence permit quantum communication applications such as quantum cryptography on a global scale. Integration of a source generating entangled photon pairs and single-photon detection into existing optical terminal designs is feasible. Even more, major subunits of the classical terminals such as those for pointing, acquisition, and tracking as well as those providing the required electronic, thermal, and structural backbone can be adapted so as to meet the quantum communication terminal needs.

  3. Superstructure high efficiency photovoltaics

    NASA Technical Reports Server (NTRS)

    Wagner, M.; So, L. C.; Leburton, J. P.

    1987-01-01

    A novel class of photovoltaic cascade structures is introduced which features multijunction upper subcells. These superstructure high efficiency photovoltaics (SHEP's) exhibit enhanced upper subcell spectral response because of the additional junctions which serve to reduce bulk recombination losses by decreasing the mean collection distance for photogenerated minority carriers. Two possible electrical configurations were studied and compared: a three-terminal scheme that allows both subcells to be operated at their individual maximum power points and a two-terminal configuration with an intercell ohmic contact for series interconnection. The three-terminal devices were found to be superior both in terms of beginning-of-life expectancy and radiation tolerance. Realistic simulations of three-terminal AlGaAs/GaAs SHEP's show that one sun AMO efficiencies in excess of 26 percent are possible.

  4. Modeling hurricane evacuation traffic : evaluation of freeway contraflow evacuation initiation and termination point configurations.

    DOT National Transportation Integrated Search

    2010-06-01

    Over the last five years, the departments of transportation in 12 coastal states threatened by hurricanes have developed plans for the implementation of contraflow traffic operations on freeways during evacuations. Contraflow involves the use of one ...

  5. Modeling hurricane evacuation traffic : evaluation of freeway contraflow evacuation initiation and termination point configurations.

    DOT National Transportation Integrated Search

    2006-06-01

    Over the last 5 years, the Departments of Transportation in 12 coastal states threatened by hurricanes have developed plans for the implementation of contraflow traffic operations on freeways during evacuations. Contraflow involves the use of one or ...

  6. IFR Operations at Non-Towered, Non-Radar Airports: Can we do Better Than One-at-a-Time?

    NASA Technical Reports Server (NTRS)

    Jones, K.; Williams, D.; Consiglio, M.; Adams, C.; Abbott, T.

    2003-01-01

    This paper describes a new concept for operations in non-radar terminal airspace around small, nontowered airports. Currently, air traffic operations in instrument meteorological conditions (IMC) at airfields without control towers and radar service are severely constrained by what is known as the one-in/one-out paradigm. Under these conditions only one operation (either arrival or departure) is allowed to occur at a time. Since these operations can take over 15 minutes to complete, capacity at these airports is severely restricted in IMC. The proposed concept is an attempt to break this current paradigm by applying emerging airborne and ground-based technologies to enable simultaneous operations by multiple aircraft in nonradar terminal airspace around small non-towered airports in IMC. The general philosophy underlying this concept of operations is the establishment of a newly defined area surrounding these airports called a Self-Controlled Area (SCA). Aircraft operating within the SCA are required to have a specified minimum level of equipage. Within the SCA, pilots are responsible for separating themselves from other similarly equipped aircraft through the use of new onboard systems and procedures. This concept also takes advantage of newly developed automation at the airport, which provides appropriate sequencing information to the pilots for safe and improved operations. Such operations would enhance the opportunity for point-to-point air taxi or charter operations into smaller airfields that are closer to a traveler s origin and destination. A description of this concept of operations and a simulation environment used for evaluation is provided in this paper.

  7. The SILEX experiment system operations

    NASA Technical Reports Server (NTRS)

    Demelenne, B.

    1994-01-01

    The European Space Agency is going to conduct an inter orbit link experiment which will connect a low Earth orbiting satellite and a Geostationary satellite via optical terminals. This experiment has been called SILEX (Semiconductor Inter satellite Link EXperiment). Two payloads will be built. One called PASTEL (PASsager de TELecommunication) will be embarked on the French Earth observation satellite SPOT4. The future European experimental data relay satellite ARTEMIS (Advanced Relay and TEchnology MISsion) will carry the OPALE terminal (Optical PAyload Experiment). The principal characteristic of the mission is a 50 Megabits flow of data transmitted via the optical satellite link. The relay satellite will route the data via its feeder link thus permitting a real time reception in the European region of images taken by the observation satellite. The PASTEL terminal has been designed to cover up to 9 communication sessions per day with an average of 5. The number of daily contact opportunities with the low earth orbiting satellite will be increased and the duration will be much longer than the traditional passes over a ground station. The terminals have an autonomy of 24 hours with respect to ground control. Each terminal will contain its own orbit model and that of its counter terminal for orbit prediction and for precise computation of pointing direction. Due to the very narrow field of view of the communication laser beam, the orbit propagation calculation needs to be done with a very high accuracy. The European Space Agency is responsible for the operation of both terminals. A PASTEL Mission Control System (PMCS) is being developed to control the PASTEL terminal on board SPOT4. The PMCS will interface with the SPOT4 Control Centre for the execution of the PASTEL operations. The PMCS will also interface with the ARTEMIS Mission Control System for the planning and the coordination of the operation. It is the first time that laser technology will be used to support inter-satellite links in Europe. Due to the complexity and experimental character of this new optical technology, the SILEX experiment control facilities will be designed to allow as much operational flexibility as possible.

  8. The design of digital-adaptive controllers for VTOL aircraft

    NASA Technical Reports Server (NTRS)

    Stengel, R. F.; Broussard, J. R.; Berry, P. W.

    1976-01-01

    Design procedures for VTOL automatic control systems have been developed and are presented. Using linear-optimal estimation and control techniques as a starting point, digital-adaptive control laws have been designed for the VALT Research Aircraft, a tandem-rotor helicopter which is equipped for fully automatic flight in terminal area operations. These control laws are designed to interface with velocity-command and attitude-command guidance logic, which could be used in short-haul VTOL operations. Developments reported here include new algorithms for designing non-zero-set-point digital regulators, design procedures for rate-limited systems, and algorithms for dynamic control trim setting.

  9. Systems and methods for processing irradiation targets through a nuclear reactor

    DOEpatents

    Dayal, Yogeshwar; Saito, Earl F.; Berger, John F.; Brittingham, Martin W.; Morales, Stephen K.; Hare, Jeffrey M.

    2016-05-03

    Apparatuses and methods produce radioisotopes in instrumentation tubes of operating commercial nuclear reactors. Irradiation targets may be inserted and removed from instrumentation tubes during operation and converted to radioisotopes otherwise unavailable during operation of commercial nuclear reactors. Example apparatuses may continuously insert, remove, and store irradiation targets to be converted to useable radioisotopes or other desired materials at several different origin and termination points accessible outside an access barrier such as a containment building, drywell wall, or other access restriction preventing access to instrumentation tubes during operation of the nuclear plant.

  10. Tracking and data relay satellite system - NASA's new spacecraft data acquisition system

    NASA Technical Reports Server (NTRS)

    Schneider, W. C.; Garman, A. A.

    1979-01-01

    This paper describes NASA's new spacecraft acquisition system provided by the Tracking and Data Relay Satellite System (TDRSS). Four satellites in geostationary orbit and a ground terminal will provide complete tracking, telemetry, and command service for all of NASA's orbital satellites below a 12,000 km altitude. Western Union will lease the system, operate the ground terminal and provide operational satellite control. NASA's network control center will be the focal point for scheduling user services and controlling the interface between TDRSS and the NASA communications network, project control centers, and data processing. TDRSS single access user spacecraft data systems will be designed for time shared data relay support, and reimbursement policy and rate structure for non-NASA users are being developed.

  11. Evaluation of a Transportable Hot-Gas Decontamination System for the Decontamination of Explosives-Contaminated Debris & Piping. Operations & Maintenance Manual. Volume III.

    DTIC Science & Technology

    1995-06-27

    Terminal Board............ $55.00 CONTROLS E-53-29 ( Non -etock: 2 weeks) Ebony Terminal Board with Screws ..........$70.00 NOTE: All control orders...in XL and TF models after 198 1. Non -asbe stos listed prices. mstedial is used.II Honeywell UDC 3000 Single Set Point Control $550.00 Small Roind...Honeywell. Leeds and Northrup, NOTE- This looks like a mushroom wit a. 314? hole in the Research Inc. and many other controls are available by center

  12. 46 CFR 98.25-40 - Valves, fittings, and accessories.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... located at the highest practical point. The thermometer well shall terminate in the liquid space and be... and discharge liquid and vapor shut-off valves, safety relief valves, liquid level gaging devices... to the tanks, except safety devices and liquid level gaging devices, shall have manually operated...

  13. 46 CFR 98.25-40 - Valves, fittings, and accessories.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... located at the highest practical point. The thermometer well shall terminate in the liquid space and be... and discharge liquid and vapor shut-off valves, safety relief valves, liquid level gaging devices... to the tanks, except safety devices and liquid level gaging devices, shall have manually operated...

  14. 46 CFR 98.25-40 - Valves, fittings, and accessories.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... located at the highest practical point. The thermometer well shall terminate in the liquid space and be... and discharge liquid and vapor shut-off valves, safety relief valves, liquid level gaging devices... to the tanks, except safety devices and liquid level gaging devices, shall have manually operated...

  15. 46 CFR 98.25-40 - Valves, fittings, and accessories.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... located at the highest practical point. The thermometer well shall terminate in the liquid space and be... and discharge liquid and vapor shut-off valves, safety relief valves, liquid level gaging devices... to the tanks, except safety devices and liquid level gaging devices, shall have manually operated...

  16. 47 CFR 22.602 - Transition of the 2110-2130 and 2160-2180 MHz channels to emerging technologies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... terminate operations (e.g., if public safety communications services would be disrupted). (k) Reimbursement... channels to emerging technologies. 22.602 Section 22.602 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Paging and Radiotelephone Service Point...

  17. The LIM and POU homeobox genes ttx-3 and unc-86 act as terminal selectors in distinct cholinergic and serotonergic neuron types.

    PubMed

    Zhang, Feifan; Bhattacharya, Abhishek; Nelson, Jessica C; Abe, Namiko; Gordon, Patricia; Lloret-Fernandez, Carla; Maicas, Miren; Flames, Nuria; Mann, Richard S; Colón-Ramos, Daniel A; Hobert, Oliver

    2014-01-01

    Transcription factors that drive neuron type-specific terminal differentiation programs in the developing nervous system are often expressed in several distinct neuronal cell types, but to what extent they have similar or distinct activities in individual neuronal cell types is generally not well explored. We investigate this problem using, as a starting point, the C. elegans LIM homeodomain transcription factor ttx-3, which acts as a terminal selector to drive the terminal differentiation program of the cholinergic AIY interneuron class. Using a panel of different terminal differentiation markers, including neurotransmitter synthesizing enzymes, neurotransmitter receptors and neuropeptides, we show that ttx-3 also controls the terminal differentiation program of two additional, distinct neuron types, namely the cholinergic AIA interneurons and the serotonergic NSM neurons. We show that the type of differentiation program that is controlled by ttx-3 in different neuron types is specified by a distinct set of collaborating transcription factors. One of the collaborating transcription factors is the POU homeobox gene unc-86, which collaborates with ttx-3 to determine the identity of the serotonergic NSM neurons. unc-86 in turn operates independently of ttx-3 in the anterior ganglion where it collaborates with the ARID-type transcription factor cfi-1 to determine the cholinergic identity of the IL2 sensory and URA motor neurons. In conclusion, transcription factors operate as terminal selectors in distinct combinations in different neuron types, defining neuron type-specific identity features.

  18. Identification and Analysis of National Airspace System Resource Constraints

    NASA Technical Reports Server (NTRS)

    Smith, Jeremy C.; Marien, Ty V.; Viken, Jeffery K.; Neitzke, Kurt W.; Kwa, Tech-Seng; Dollyhigh, Samuel M.; Fenbert, James W.; Hinze, Nicolas K.

    2015-01-01

    This analysis is the deliverable for the Airspace Systems Program, Systems Analysis Integration and Evaluation Project Milestone for the Systems and Portfolio Analysis (SPA) focus area SPA.4.06 Identification and Analysis of National Airspace System (NAS) Resource Constraints and Mitigation Strategies. "Identify choke points in the current and future NAS. Choke points refer to any areas in the en route, terminal, oceanic, airport, and surface operations that constrain actual demand in current and projected future operations. Use the Common Scenarios based on Transportation Systems Analysis Model (TSAM) projections of future demand developed under SPA.4.04 Tools, Methods and Scenarios Development. Analyze causes, including operational and physical constraints." The NASA analysis is complementary to a NASA Research Announcement (NRA) "Development of Tools and Analysis to Evaluate Choke Points in the National Airspace System" Contract # NNA3AB95C awarded to Logistics Management Institute, Sept 2013.

  19. NASA System Engineering Design Process

    NASA Technical Reports Server (NTRS)

    Roman, Jose

    2011-01-01

    This slide presentation reviews NASA's use of systems engineering for the complete life cycle of a project. Systems engineering is a methodical, disciplined approach for the design, realization, technical management, operations, and retirement of a system. Each phase of a NASA project is terminated with a Key decision point (KDP), which is supported by major reviews.

  20. Visual Cues for an Adaptive Expert System.

    ERIC Educational Resources Information Center

    Miller, Helen B.

    NCR (National Cash Register) Corporation is pursuing opportunities to make their point of sale (POS) terminals easy to use and easy to learn. To approach the goal of making the technology invisible to the user, NCR has developed an adaptive expert prototype system for a department store POS operation. The structure for the adaptive system, the…

  1. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  2. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... scrap, new assembled motor vehicles, waste paper and paper waste in terminal schedules. (2) Marine... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  3. Evolutionary pattern search algorithms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hart, W.E.

    1995-09-19

    This paper defines a class of evolutionary algorithms called evolutionary pattern search algorithms (EPSAs) and analyzes their convergence properties. This class of algorithms is closely related to evolutionary programming, evolutionary strategie and real-coded genetic algorithms. EPSAs are self-adapting systems that modify the step size of the mutation operator in response to the success of previous optimization steps. The rule used to adapt the step size can be used to provide a stationary point convergence theory for EPSAs on any continuous function. This convergence theory is based on an extension of the convergence theory for generalized pattern search methods. An experimentalmore » analysis of the performance of EPSAs demonstrates that these algorithms can perform a level of global search that is comparable to that of canonical EAs. We also describe a stopping rule for EPSAs, which reliably terminated near stationary points in our experiments. This is the first stopping rule for any class of EAs that can terminate at a given distance from stationary points.« less

  4. Authomatization of Digital Collection Access Using Mobile and Wireless Data Terminals

    NASA Astrophysics Data System (ADS)

    Leontiev, I. V.

    Information technologies become vital due to information processing needs, database access, data analysis and decision support. Currently, a lot of scientific projects are oriented on database integration of heterogeneous systems. The problem of on-line and rapid access to large integrated systems of digital collections is also very important. Usually users move between different locations, either at work or at home. In most cases users need an efficient and remote access to information, stored in integrated data collections. Desktop computers are unable to fulfill the needs, so mobile and wireless devices become helpful. Handhelds and data terminals are nessessary in medical assistance (they store detailed information about each patient, and helpful for nurses), immediate access to data collections is used in a Highway patrol services (databanks of cars, owners, driver licences). Using mobile access, warehouse operations can be validated. Library and museum items cyclecounting will speed up using online barcode-scanning and central database access. That's why mobile devices - cell phones, PDA, handheld computers with wireless access, WindowsCE and PalmOS terminals become popular. Generally, mobile devices have a relatively slow processor, and limited display capabilities, but they are effective for storing and displaying textual data, recognize user hand-writing with stylus, support GUI. Users can perform operations on handheld terminal, and exchange data with the main system (using immediate radio access, or offline access during syncronization process) for update. In our report, we give an approach for mobile access to data collections, which raises an efficiency of data processing in a book library, helps to control available books, books in stock, validate service charges, eliminate staff mistakes, generate requests for book delivery. Our system uses mobile devices Symbol RF (with radio-channel access), and data terminals Symbol Palm Terminal for batch-processing and synchronization with remote library databases. We discuss the use of PalmOS-compatible devices, and WindowsCE terminals. Our software system is based on modular, scalable three-tier architecture. Additional functionality can be easily customized. Scalability is also supplied by Internet / Intranet technologies, and radio-access points. The base module of the system supports generic warehouse operations: cyclecounting with handheld barcode-scanners, efficient items delivery and issue, item movement, reserving, report generating on finished and in-process operations. Movements are optimized using worker's current location, operations are sorted in a priority order and transmitted to mobile and wireless worker's terminals. Mobile terminals improve of tasks processing control, eliminate staff mistakes, display actual information about main processes, provide data for online-reports, and significantly raise the efficiency of data exchange.

  5. Digital Autonomous Terminal Access Communication (DATAC) system

    NASA Technical Reports Server (NTRS)

    Novacki, Stanley M., III

    1987-01-01

    In order to accommodate the increasing number of computerized subsystems aboard today's more fuel efficient aircraft, the Boeing Co. has developed the DATAC (Digital Autonomous Terminal Access Control) bus to minimize the need for point-to-point wiring to interconnect these various systems, thereby reducing total aircraft weight and maintaining an economical flight configuration. The DATAC bus is essentially a local area network providing interconnections for any of the flight management and control systems aboard the aircraft. The task of developing a Bus Monitor Unit was broken down into four subtasks: (1) providing a hardware interface between the DATAC bus and the Z8000-based microcomputer system to be used as the bus monitor; (2) establishing a communication link between the Z8000 system and a CP/M-based computer system; (3) generation of data reduction and display software to output data to the console device; and (4) development of a DATAC Terminal Simulator to facilitate testing of the hardware and software which transfer data between the DATAC's bus and the operator's console in a near real time environment. These tasks are briefly discussed.

  6. 75 FR 353 - AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC; Notice of Availability of the Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP07-62-000; CP07-63-000... December 29, 2009. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared... impacts associated with the construction and operation of a liquefied natural gas (LNG) import terminal...

  7. ATS-6 engineering performance report. Volume 2: Orbit and attitude controls

    NASA Technical Reports Server (NTRS)

    Wales, R. O. (Editor)

    1981-01-01

    Attitude control is reviewed, encompassing the attitude control subsystem, spacecraft attitude precision pointing and slewing adaptive control experiment, and RF interferometer experiment. The spacecraft propulsion system (SPS) is discussed, including subsystem, SPS design description and validation, orbital operations and performance, in-orbit anomalies and contingency operations, and the cesium bombardment ion engine experiment. Thruster failure due to plugging of the propellant feed passages, a major cause for mission termination, are considered among the critical generic failures on the satellite.

  8. Cruise-Efficient Short Takeoff and Landing (CESTOL): Potential Impact on Air Traffic Operations

    NASA Technical Reports Server (NTRS)

    Couluris, G. J.; Signor, D.; Phillips, J.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) is investigating technological and operational concepts for introducing Cruise-Efficient Short Takeoff and Landing (CESTOL) aircraft into a future US National Airspace System (NAS) civil aviation environment. CESTOL is an aircraft design concept for future use to increase capacity and reduce emissions. CESTOL provides very flexible takeoff, climb, descent and landing performance capabilities and a high-speed cruise capability. In support of NASA, this study is a preliminary examination of the potential operational impact of CESTOL on airport and airspace capacity and delay. The study examines operational impacts at a subject site, Newark Liberty Intemational Airport (KEWR), New Jersey. The study extends these KEWR results to estimate potential impacts on NAS-wide network traffic operations due to the introduction of CESTOL at selected major airports. These are the 34 domestic airports identified in the Federal Aviation Administration's Operational Evolution Plan (OEP). The analysis process uses two fast-time simulation tools to separately model local and NAS-wide air traffic operations using predicted flight schedules for a 24-hour study period in 2016. These tools are the Sen sis AvTerminal model and NASA's Airspace Concept Evaluation System (ACES). We use both to simulate conventional-aircraft-only and CESTOL-mixed-with-conventional-aircraft operations. Both tools apply 4-dimension trajectory modeling to simulate individual flight movement. The study applies AvTerminal to model traffic operations and procedures for en route and terminal arrival and departures to and from KEWR. These AvTerminal applications model existing arrival and departure routes and profiles and runway use configurations, with the assumption jet-powered, large-sized civil CESTOL aircraft use a short runway and standard turboprop arrival and departure procedures. With these rules, the conventional jet and CESTOL aircraft are procedurally separated from each other geographically and in altitude during tenninal airspace approach and departure operations, and each use a different arrival runway. AvTeminal implements its unique Focal-point Scheduling Process to sequence, space and delay aircraft to resolve spacing and overtake conflicts among flights in the airspace and airport system serving KEWR. This Process effectively models integrated arrival and departure operations. AvTerminal assesses acceptance rates and delay magnitude and causality at selected locations, including en route outer boundary fixes, tenninal airspace arrival and departure boundary fixes, terminal airspace arrival merge and departure diverge fixes, and runway landing and takeoff runways. The analysis compares the resulting capacity impacts, flight delays and delay sources between CESTOL and conventional KEWR operations. AvTerminal quantitative results showed that CESTOL has significant capability to increase airport arrival acceptance rates (35-40% at KEWR) by taking advantage of otherwise underused airspace and runways where available. The study extrapolates the AvTerminal-derived KEWR peak arrival and departure acceptance rates to estimate capacity parameter values for each of the OEP airports in the ACES modeling of traffic through the entire NAS network. The extrapolations of acceptance rates allow full, partial or no achievement of CESTOL capacity gains at an OEP airport as determined by assessments of the degree to which local procedures allow leveraging of CESTOL capabilities. These assessments consider each OEP airport's runway geometries, runway system configurations, airport and airspace operations, and potential CESTOL traffic loadings. The ACES modeling, simulates airport and airspace spacing constraints imposed by airport runway system, terminal and en route air traffic control and traffic flow management operations using airport acceptance rates representing conventional-aircraft-only and CESTOL-mixed operations. CEOL aircraft are assumed to have Mach 0.8, and alternatively Mach 0.7, cruise speeds to examine compatibility with conventional aircraft operations in common airspace. The ACES results provides estimates of CESTOL delay impact NAS-wide and at OEP airports due to changes in OEP airport acceptance rates and changes in en route airspace potential conflict rates. Preliminary results show meaningful nationwide delay reductions (20%) due to CESTOL operations at 34 major domestic airports.

  9. Distinguishing Core and Holoenzyme Mechanisms of Transcription Termination by RNA Polymerase III

    PubMed Central

    Arimbasseri, Aneeshkumar G.

    2013-01-01

    Transcription termination by RNA polymerase (Pol) III serves multiple purposes; it delimits interference with downstream genes, forms 3′ oligo(U) binding sites for the posttranscriptional processing factor, La protein, and resets the polymerase complex for reinitiation. Although an interplay of several Pol III subunits is known to collectively control these activities, how they affect molecular function of the active center during termination is incompletely understood. We have approached this using immobilized Pol III-nucleic acid scaffolds to examine the two major components of termination, transcription pausing and RNA release. This allowed us to distinguish two mechanisms of termination by isolated Saccharomyces cerevisiae Pol III. A core mechanism can operate in the absence of C53/37 and C11 subunits but requires synthesis of 8 or more 3′ U nucleotides, apparently reflecting inherent sensitivity to an oligo(rU·dA) hybrid that is the termination signal proper. The holoenzyme mechanism requires fewer U nucleotides but uses C53/37 and C11 to slow elongation and prevent terminator arrest. N-terminal truncation of C53 or point mutations that disable the cleavage activity of C11 impair their antiarrest activities. The data are consistent with a model in which C53, C37, and C11 activities are functionally integrated with the active center of Pol III during termination. PMID:23401852

  10. The quality of service in passenger transport terminals

    NASA Astrophysics Data System (ADS)

    Oprea, C.; Roşca, E.; Popa, M.; Ilie, A.; Dinu, O.; Roşca, M.

    2016-11-01

    The quality of service in transport terminals is differently perceived by engineers, economists, transport operators and sociologists. The traveler's perception is nevertheless decisive. The quality of service is well connected with the inside design of terminals, with the facilities in terminals and with the provided service standards. In order to provide a high level of service, the activities taking place in the public transport terminal and the maximum travelers flow size must be carefully analyzed and dimensioned. The purpose of modelling is to find the best route for each traveler from origin (entrance) to destination (exit) through all the intermediate service points, taking into consideration the instant network conditions. In developing the model we consider the walking, the waiting and the serving time. Using a simulation program written in ARENA we determine the waiting time. For validation, the model is used to evaluate the performance level in Bucharest Basarab station. By comparing the total walking distance for the possible routes and the utility function that describes the utility of all activities from entrance to exit we can find the optimal route.

  11. 33 CFR 110.236 - Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal anchorages.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal anchorages. 110.236 Section 110.236 Navigation and... Grounds § 110.236 Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal...

  12. 33 CFR 110.236 - Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal anchorages.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal anchorages. 110.236 Section 110.236 Navigation and... Grounds § 110.236 Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal...

  13. 33 CFR 110.236 - Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal anchorages.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal anchorages. 110.236 Section 110.236 Navigation and... Grounds § 110.236 Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal...

  14. Analyses of interactions between the marine terminal and highway operations : final report.

    DOT National Transportation Integrated Search

    2014-04-01

    Changes in vessel sizes arriving at United States ports may influence the operating regimes and schedules at the port terminals However, the impacts to highway and rail operations outside of the port terminals because of changing port terminal operat...

  15. 48 CFR 52.247-44 - F.o.b. Designated Air Carrier's Terminal, Point of Importation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false F.o.b. Designated Air... CLAUSES Text of Provisions and Clauses 52.247-44 F.o.b. Designated Air Carrier's Terminal, Point of... the delivery term is f.o.b. designated air carrier's terminal, point of importation: F.o.b. Designated...

  16. 48 CFR 47.303-15 - F.o.b. designated air carrier's terminal, point of exportation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false F.o.b. designated air... Contracts 47.303-15 F.o.b. designated air carrier's terminal, point of exportation. (a) Explanation of delivery term. F.o.b. designated air carrier's terminal, point of exportation means free of expense to the...

  17. 48 CFR 52.247-43 - F.o.b. Designated Air Carrier's Terminal, Point of Exportation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false F.o.b. Designated Air... CLAUSES Text of Provisions and Clauses 52.247-43 F.o.b. Designated Air Carrier's Terminal, Point of... the delivery term is f.o.b. designated air carrier's terminal, point of exportation: F.o.b. Designated...

  18. 48 CFR 47.303-16 - F.o.b. designated air carrier's terminal, point of importation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false F.o.b. designated air... Contracts 47.303-16 F.o.b. designated air carrier's terminal, point of importation. (a) Explanation of delivery term. F.o.b. designated air carrier's terminal, point of importation means free of expense to the...

  19. A New Activity-Based Financial Cost Management Method

    NASA Astrophysics Data System (ADS)

    Qingge, Zhang

    The standard activity-based financial cost management model is a new model of financial cost management, which is on the basis of the standard cost system and the activity-based cost and integrates the advantages of the two. It is a new model of financial cost management with more accurate and more adequate cost information by taking the R&D expenses as the accounting starting point and after-sale service expenses as the terminal point and covering the whole producing and operating process and the whole activities chain and value chain aiming at serving the internal management and decision.

  20. 41 CFR 302-9.206 - What should I do if there is no port or terminal at my authorized point of origin or authorized...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... there is no port or terminal at my authorized point of origin or authorized destination when I transport... Federal Travel Regulation System RELOCATION ALLOWANCES TRANSPORTATION AND STORAGE OF PROPERTY 9-ALLOWANCES... From a Post of Duty § 302-9.206 What should I do if there is no port or terminal at my authorized point...

  1. Tracking and data relay satellite system: NASA's new spacecraft data acquisition system

    NASA Astrophysics Data System (ADS)

    Schneider, W. C.; Garman, A. A.

    The growth in NASA's ground network complexity and cost triggered a search for an alternative. Through a lease service contract, Western Union will provide to NASA 10 years of space communications services with a Tracking and Data Relay Satellite System (TDRSS). A constellation of four operating satellites in geostationary orbit and a single ground terminal will provide complete tracking, telemetry and command service for all of NASA's Earth orbital satellites below an altitude of 12,000 km. The system is shared: two satellites will be dedicated to NASA service; a third will provide backup as a shared spare; the fourth satellite will be dedicated to Western Union's Advanced Westar commercial service. Western Union will operate the ground terminal and provide operational satellite control. NASA's Network Control Center will provide the focal point for scheduling user services and controlling the interface between TDRSS and the rest of the NASA communications network, project control centers and data processing facilities. TDRSS single access user spacecraft data systems should be designed for efficient time shared data relay support. Reimbursement policy and rate structure for non-NASA users are currently being developed.

  2. Video display terminal operation: a potential risk in the etiology and maintenance of temporomandibular disorders.

    PubMed

    Horowitz, L; Sarkin, J M

    1992-01-01

    Surveys indicate over 50 million Americans, mostly women, currently operate video display terminals (VDTs) at home or in the workplace. Recent epidemiological studies reveal more than 75% of approximately 30 million American temporomandibular disorder (TMD) sufferers are women. What does the VDT and TMD have in common besides an affinity for the female gender? TMD is associated with numerous risk factors that commonly initiate sympathetic nervous system and stress hormone response mechanisms resulting in muscle spasms, trigger point formation, and pain in the head and neck. Likewise VDT operation may be linked to three additional sympathetic nervous system irritants including: (1) electrostatic ambient air negative ion depletion, (2) electromagnetic radiation, and (3) eyestrain and postural stress associated with poor work habits and improper work station design. Additional research considering the roles these three factors may play in the etiology of TMD and other myofascial pain problems is indicated. Furthermore, dentists are advised to educate patients as to these possible risks, encourage preventive behaviors on the part of employers and employees, and recommend workplace health, safety, and ergonomic upgrades when indicated.

  3. 3-Dimensional Reconstruction of the ROSETTA Targets - Application to Asteroid 2867 Steins

    NASA Astrophysics Data System (ADS)

    Besse, Sebastien; Groussin, O.; Jorda, L.; Lamy, P.; OSIRIS Team

    2008-09-01

    The OSIRIS imaging experiment aboard the Rosetta spacecraft will image asteroids Steins in September 2008 and Lutetia in 2010, and comet 67P/Churyumov-Gerasimenko in 2014. An accurate determination of the shape is a key point for the success of the mission operations and scientific objectives. Based on the experience of previous space missions (Deep Impact, Near, Galileo, Hayabusa), we are developing our own procedure for the shape reconstruction of small bodies. We use two different techniques : i) limb and terminator constraints and ii) ground control points (GCP) constraints. The first method allows the determination of a rough shape of the body when it is poorly resolved and no features are visible on the surface, while the second method provides an accurate shape model using high resolution images. We are currently testing both methods on simulated data, using and developing different algorithms for limb and terminator extraction (e.g.,wavelet), detection of points of interest (Harris, Susan, Fast Corner Detection), points pairing using correlation techniques (geometric model) and 3-dimensional reconstruction using line-of-sight information (photogrammetry). Both methods will be fully automated. We will hopefully present the 3D reconstruction of the Steins asteroid from images obtained during its flyby. Acknowledgment: Sébastien Besse acknowledges CNES and Thales for funding.

  4. 41 CFR 302-9.104 - What may I do if there is no port or terminal at the point of origin and/or destination?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... is no port or terminal at the point of origin and/or destination? 302-9.104 Section 302-9.104 Public Contracts and Property Management Federal Travel Regulation System RELOCATION ALLOWANCES TRANSPORTATION AND... Transportation General § 302-9.104 What may I do if there is no port or terminal at the point of origin and/or...

  5. Combined Quarterly Technical Report Number 23. SATNET Development and Operation. Pluribus Satellite IMP Development. Remote Site Maintenance. Internet Operations and Maintenance. Mobile Access Terminal Network. TCP for the HP3000. TCP-TAC. TCP for VAX-UNIX

    DTIC Science & Technology

    1981-11-01

    evaluate and test these ideas in the Internet research context. 4. Field third-generation gateways. At this point in time, we purposely avoid selecting a...plan to cover the period from now until the time when a gateway system can be fielded which implements the results of the current work in the Internet ... research community. The current gateway system is inadequate from both a functionality and a• performance standpoint, and therefore the transition

  6. Advanced Extremely High Frequency Satellite (AEHF)

    DTIC Science & Technology

    2013-12-01

    terminals Milstar Backward Compatible Operate with the Milstar system, at all LDR and MDR terminal supported data rates, throughout the Milstar...transition to the AEHF system Operate with the Milstar system, at all LDR and MDR terminal supported data rates, throughout the Milstar...transition to the AEHF system Operate with the Milstar system, at all LDR and MDR terminal supported data rates, throughout the Milstar

  7. Concept of Operations for the Next Generation Air Transportation System. Version 3.2

    DTIC Science & Technology

    2011-01-01

    Airside. Security Identification Display Area/Airport ( SIDA ) operations area, terminal perimeter, terminal airspace (security) • Landside. Terminal...Definition RTSS Remote Terminal Security Screening SAA Special Activity Airspace SIDA Security Identification Display Area SM Separation Management

  8. Definition, analysis and development of an optical data distribution network for integrated avionics and control systems

    NASA Technical Reports Server (NTRS)

    Burns, R. R.

    1981-01-01

    The potential and functional requirements of fiber optic bus designs for next generation aircraft are assessed. State-of-the-art component evaluations and projections were used in the system study. Complex networks were decomposed into dedicated structures, star buses, and serial buses for detailed analysis. Comparisons of dedicated links, star buses, and serial buses with and without full duplex operation and with considerations for terminal to terminal communication requirements were obtained. This baseline was then used to consider potential extensions of busing methods to include wavelength multiplexing and optical switches. Example buses were illustrated for various areas of the aircraft as potential starting points for more detail analysis as the platform becomes definitized.

  9. High-performance mirror for space applications using anodic bonding technology

    NASA Astrophysics Data System (ADS)

    Otto, W.; Fischer, E.; Kemper, J.; Koch, S.; Kolberg, J.; Kramer, C.; Kunde, J.; Läger, M.

    2017-11-01

    Berliner Glas developed and manufactured the plane elliptical shaped mirrors for the Synopta Coarse Pointing Assembly (CPA) being one of the key elements of the TESAT Spacecom Laser Communication Terminals (LCT's). The first TESAT LCT containing a Synopta CPA was embarked on Sentinel 1A and is in orbit since April 2014. TESAT Spacecom LCT's have been successfully tested in space since 2007 and are now operationally used in commercial satellite communication systems.

  10. Low Cost Precision Lander for Lunar Exploration

    NASA Astrophysics Data System (ADS)

    Hoppa, G. V.; Head, J. N.; Gardner, T. G.; Seybold, K. G.

    2004-12-01

    For 60 years the US Defense Department has invested heavily in producing small, low mass, precision-guided vehicles. The technologies matured under these programs include terrain-aided navigation, closed loop terminal guidance algorithms, robust autopilots, high thrust-to-weight propulsion, autonomous mission management software, sensors, and data fusion. These technologies will aid NASA in addressing New Millennium Science and Technology goals as well as the requirements flowing from the Moon to Mars vision articulated in January 2004. Establishing and resupplying a long-term lunar presence will require automated landing precision not yet demonstrated. Precision landing will increase safety and assure mission success. In our lander design, science instruments amount to 10 kg, 16% of the lander vehicle mass. This compares favorably with 7% for Mars Pathfinder and less than 15% for Surveyor. The mission design relies on a cruise stage for navigation and TCMs for the lander's flight to the moon. The landing sequence begins with a solid motor burn to reduce the vehicle speed to 300-450 m/s. At this point the lander is about 2 minutes from touchdown and has 600 to 700 m/s delta-v capability. This allows for about 10 km of vehicle divert during terminal descent. This concept of operations closely mimics missile operational protocol used for decades: the vehicle remains inert, then must execute its mission flawlessly on a moment's notice. The vehicle design uses a propulsion system derived from heritage MDA programs. A redesigned truss provides hard points for landing gear, electronics, power supply, and science instruments. A radar altimeter and a Digital Scene Matching Area Correlator (DSMAC) provide data for the terminal guidance algorithms. This approach leverages the billions of dollars DoD has invested in these technologies, to land useful science payloads precisely on the lunar surface at relatively low cost.

  11. Concept of Operations for the Next Generation Air Transportation System, Version 2.0

    DTIC Science & Technology

    2007-06-13

    SIDA )/airport operations area (AOA), [R-110] terminal perimeter, terminal airspace (security) • Landside. Terminal public and commercial roadways and...Required Surveillance Performance RTSS Remote Terminal Security Screening SAA Special Activity Airspace SIDA Security Identification Display Area SM...impede airside operations? R-110 Research 6.4.2/C. 4.4.1 Airside: Security Identification Display Area ( SIDA )/AOA R&D needed to develop and

  12. Universal statistics of terminal dynamics before collapse

    NASA Astrophysics Data System (ADS)

    Lenner, Nicolas; Eule, Stephan; Wolf, Fred

    Recent biological developments have both drastically increased the precision as well as amount of generated data, allowing for a switching from pure mean value characterization of the process under consideration to an analysis of the whole ensemble, exploiting the stochastic nature of biology. We focus on the general class of non-equilibrium processes with distinguished terminal points as can be found in cell fate decision, check points or cognitive neuroscience. Aligning the data to a terminal point (e.g. represented as an absorbing boundary) allows to device a general methodology to characterize and reverse engineer the terminating history. Using a small noise approximation we derive mean variance and covariance of the aligned data for general finite time singularities.

  13. Development of a character, line and point display system. [for medical records

    NASA Technical Reports Server (NTRS)

    Owen, E. W.

    1977-01-01

    A compact graphics terminal for use as the input to a computerized medical records system is described. The principal mode of communication between the terminal and the records system is by checklists and menu selection. However, the terminal accepts short, handwritten messages as well as conventional alphanumeric input. The terminal consists of an electronic tablet, a display, a microcomputer controller, a character generator, and a refresh memory for the display. An Intel SBC 80/10 microcomputer controls the flow of information and a 16 kilobyte memory stores the point-by-point array of information to be displayed. A specially designed interface continuously generates the raster display without the intervention of the microcomputer.

  14. 78 FR 75359 - Waterway Suitability Assessment for Construction and Operation of Liquefied Gas Terminals; Orange...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-11

    ... Assessment for Construction and Operation of Liquefied Gas Terminals; Orange, TX AGENCY: Coast Guard, DHS... construction to expand or modify marine terminal operations in an existing facility handling Liquefied Natural Gas (LNG) OR Liquefied Hazardous Gas (LHG), where the construction, expansion, or modification would...

  15. 30 CFR 250.1007 - What to include in applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... coordinates of key points; and the location of other pipelines that will be connected to or crossed by the proposed pipeline(s). The initial and terminal points of the pipeline and any continuation into State jurisdiction shall be accurately located even if the pipeline is to have an onshore terminal point. A plat(s...

  16. Field Evaluation of the Sidestream Sensors for Filter/Separators and Clay Filters.

    DTIC Science & Technology

    1987-02-01

    originally, but only the Atlanta and New York ( JFK ) airports produced suitable test results. At O’Hare (Chicago) Airport, the operator advised the...the JFK Airport installation, every one of the eight test runs terminated prematurely because solids caused pressure drop buildup before any surfactant...about 20 points. In this test period, the high CSS rating also confirmed the activity of the clay. At JFK Airport , the CSS was tested on 27 occasions

  17. Aeroacoustics of contoured and solid/porous conical plug-nozzle supersonic jet flows

    NASA Technical Reports Server (NTRS)

    Dosanjh, D. S.; Das, I. S.

    1985-01-01

    The acoustic far field, the shock-associated noise and characteristics of the repetitive shock structure of supersonic jet flows issuing from a contoured plug-nozzle and uncontoured plug-nozzle having a short conical plug of either a solid or a combination of solid/porous surface with pointed termination operated at a range of supercritical pressure are reported. The contoured and the uncontoured plug-nozzles had the same throat area and the same annular-radius ratio.

  18. 75 FR 82426 - Big Four Terminal Railroad, LLC-Operation Exemption-RMW Ventures, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35454] Big Four Terminal Railroad, LLC--Operation Exemption--RMW Ventures, LLC Big Four Terminal Railroad, LLC (BFTR), has filed a verified notice of exemption under 49 CFR 1150.31 to operate over 5.2 +/- miles of rail line between...

  19. Method of forming calthrate ice

    DOEpatents

    Hino, T.; Gorski, A.J.

    1985-09-30

    A method of forming clathrate ice in a supercooled water-based liquid contained in a vessel is disclosed. Initially, an oscillator device is located in the liquid in the vessel. The oscillator device is then oscillated ultransonically so that small crystals are formed in the liquid. Thes small crystals serve as seed crystals for ice formation in the liquid and thereby prevent supercooling of the liquid. Preferably, the oscillating device is controlled by a thermostat which initiates operation of the oscillator device when the temperature of the liquid is lowered to the freezing point. Thereafter, the operation of the oscillator device is terminated when ice is sensed in the liquid by an ice sensor.

  20. Method of forming clathrate ice

    DOEpatents

    Hino, Toshiyuki; Gorski, Anthony J.

    1987-01-01

    A method of forming clathrate ice in a supercooled water-based liquid contained in a vessel is disclosed. Initially, an oscillator device is located in the liquid in the vessel. The oscillator device is then oscillated ultrasonically so that small crystals are formed in the liquid. These small crystals serve as seed crystals for ice formation in the liquid and thereby prevent supercooling of the liquid. Preferably, the oscillating device is controlled by a thermostat which initiates operation of the oscillator device when the temperature of the liquid is lowered to the freezing point. Thereafter, the operation of the oscillator device is terminated when ice is sensed in the liquid by an ice sensor.

  1. ATS-6 - Technical aspects of the Health/Education Telecommunications Experiment

    NASA Technical Reports Server (NTRS)

    Boor, J. L.; Braunstein, J.; Janky, J. M.; Ogden, D.; Potter, J. G.; Harper, E. L.; Volkmer, E.; Whalen, A. A.; Henderson, E.; Hupe, H. H.

    1975-01-01

    An overview is given of the HET experiment on ATS-6. The paper is divided into nine parts, including a technical overview, a preliminary evaluation of the HET demonstration, a review of operations at the Denver uplink terminal, a discussion of remote ground terminals, a review of C-band comprehensive terminals and of S-band comprehensive terminals, and parts devoted to general network operations, technical management and effectiveness of the network, and the site equipment operator.

  2. The two-way time synchronization system via a satellite voice channel

    NASA Technical Reports Server (NTRS)

    Heng-Qiu, Zheng; Ren-Huan, Zhang; Yong-Hui, HU

    1994-01-01

    A newly developed two-way time synchronization system is described in this paper. The system uses one voice channel at a SCPC satellite digital communication earth station, whose bandwidth is only 45 kHz, thus saving satellite resources greatly. The system is composed of one master station and one or several, up to sixty-two, secondary stations. The master and secondary stations are equipped with the same equipment, including a set of timing equipment, a synthetic data terminal for time synchronizing, and a interface unit between the data terminal and the satellite earth station. The synthetic data terminal for time synchronization also has an IRIG-B code generator and a translator. The data terminal of master station is the key part of whole system. The system synchronization process is full automatic, which is controlled by the master station. Employing an autoscanning technique and conversational mode, the system accomplishes the following tasks: linking up liaison with each secondary station in turn, establishing a coarse time synchronization, calibrating date (years, months, days) and time of day (hours, minutes, seconds), precisely measuring the time difference between local station and the opposite station, exchanging measurement data, statistically processing the data, rejecting error terms, printing the data, calculating the clock difference and correcting the phase, thus realizing real-time synchronization from one point to multiple points. We also designed an adaptive phase circuit to eliminate the phase ambiguity of the PSK demodulator. The experiments have shown that the time synchronization accuracy is better than 2 mu S. The system has been put into regular operation.

  3. 14 CFR 121.537 - Responsibility for operational control: Supplemental operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations..., and termination of a flight in compliance with this chapter and the operations specifications. The... termination of a flight but he may not delegate the responsibility for those functions. (c) The director of...

  4. 14 CFR 121.537 - Responsibility for operational control: Supplemental operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations..., and termination of a flight in compliance with this chapter and the operations specifications. The... termination of a flight but he may not delegate the responsibility for those functions. (c) The director of...

  5. 14 CFR 121.537 - Responsibility for operational control: Supplemental operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations..., and termination of a flight in compliance with this chapter and the operations specifications. The... termination of a flight but he may not delegate the responsibility for those functions. (c) The director of...

  6. 14 CFR 121.537 - Responsibility for operational control: Supplemental operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations..., and termination of a flight in compliance with this chapter and the operations specifications. The... termination of a flight but he may not delegate the responsibility for those functions. (c) The director of...

  7. 14 CFR 121.537 - Responsibility for operational control: Supplemental operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations..., and termination of a flight in compliance with this chapter and the operations specifications. The... termination of a flight but he may not delegate the responsibility for those functions. (c) The director of...

  8. 77 FR 2127 - Birmingham Terminal Railway, L.L.C.-Acquisition and Operation Exemption-Birmingham Southern...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... Terminal Railway, L.L.C.--Acquisition and Operation Exemption--Birmingham Southern Railroad Company Birmingham Terminal Railway, L.L.C. (BHRR), a noncarrier, has filed a verified notice of exemption under 49... Exemption--Birmingham Terminal Railway, L.L.C., wherein Watco Holdings, Inc., seeks Board approval to...

  9. Atmospheric-Fade-Tolerant Tracking and Pointing in Wireless Optical Communication

    NASA Technical Reports Server (NTRS)

    Ortiz, Gerardo; Lee, Shinhak

    2003-01-01

    An acquisition, tracking, and pointing (ATP) system, under development at the time of reporting the information for this article, is intended to enable a terminal in a free-space optical communication system to continue to aim its transmitting laser beam toward a receiver at a remote terminal when the laser beacon signal from the remote terminal temporarily fades or drops out of sight altogether. Such fades and dropouts can be caused by adverse atmospheric conditions (e.g., rain or clouds). They can also occur when intervening objects block the line of sight between terminals as a result of motions of those objects or of either or both terminals

  10. MSL EDL Entry Guidance using the Entry Terminal Point Controller

    NASA Technical Reports Server (NTRS)

    2006-01-01

    The Mars Science Laboratory will be the first Mars mission to attempt a guided entry with the objective of safely delivering the entry vehicle to a survivable parachute deploy state within 10 km of the pre-designated landing site. The Entry Terminal Point Controller guidance algorithm is derived from the final phase Apollo Command Module guidance and, like Apollo, modulates the bank angle to control range based on deviations in range, altitude rate, and drag acceleration from a reference trajectory. For application to Mars landers which must make use of the tenuous Martian atmosphere, it is critical to balance the lift of the vehicle to minimize the range while still ensuring a safe deploy altitude. An overview of the process to generate optimized guidance settings is presented, discussing improvements made over the last four years. Performance tradeoffs between ellipse size and deploy altitude will be presented, along with imposed constraints of entry acceleration and heating. Performance sensitivities to the bank reversal deadbands, heading alignment, attitude initialization error, and atmospheric delivery errors are presented. Guidance settings for contingency operations, such as those appropriate for severe dust storm scenarios, are evaluated.

  11. Aeroacoustics of supersonic jet flows from contoured and solid/porous conical plug-nozzles

    NASA Technical Reports Server (NTRS)

    Dosanjh, Darshan S.; Das, Indu S.

    1987-01-01

    The results of an experimental study of the acoustic far-field, the shock associated noise, and the nature of the repetitive shock structure of supersonic jet flows issuing from plug-nozzles having externally-expanded plugs with pointed termination operated at a range of supercritical pressure ratios Xi approaching 2 to 4.5 are reported. The plug of one of these plug-nozzles was contoured. The other plug-nozzles had short conical plugs with either a solid surface or a combination of solid/porous surface of different porosities. The contoured and the uncontoured plug-nozzles had the same throat area and the same annulus-radius ratio K = R sub p/R sub N = 0.43. As the result of modifications of the shock structure, the acoustic performance of improperly expanded jet flows of an externally-expanded short uncontoured plug of an appropriate geometry with suitably perforated plug and a pointed termination, is shown to approach the acoustic performance of a shock-free supersonic jet issuing from an equivalent externally-expanded contoured plug-nozzle.

  12. A simple, analytic 3-dimensional downburst model based on boundary layer stagnation flow

    NASA Technical Reports Server (NTRS)

    Oseguera, Rosa M.; Bowles, Roland L.

    1988-01-01

    A simple downburst model is developed for use in batch and real-time piloted simulation studies of guidance strategies for terminal area transport aircraft operations in wind shear conditions. The model represents an axisymmetric stagnation point flow, based on velocity profiles from the Terminal Area Simulation System (TASS) model developed by Proctor and satisfies the mass continuity equation in cylindrical coordinates. Altitude dependence, including boundary layer effects near the ground, closely matches real-world measurements, as do the increase, peak, and decay of outflow and downflow with increasing distance from the downburst center. Equations for horizontal and vertical winds were derived, and found to be infinitely differentiable, with no singular points existent in the flow field. In addition, a simple relationship exists among the ratio of maximum horizontal to vertical velocities, the downdraft radius, depth of outflow, and altitude of maximum outflow. In use, a microburst can be modeled by specifying four characteristic parameters, velocity components in the x, y and z directions, and the corresponding nine partial derivatives are obtained easily from the velocity equations.

  13. 33 CFR 165.502 - Safety and Security Zone; Cove Point Liquefied Natural Gas Terminal, Chesapeake Bay, Maryland.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Safety and Security Zone; Cove Point Liquefied Natural Gas Terminal, Chesapeake Bay, Maryland. 165.502 Section 165.502 Navigation and... Areas Fifth Coast Guard District § 165.502 Safety and Security Zone; Cove Point Liquefied Natural Gas...

  14. 33 CFR 165.502 - Safety and Security Zone; Cove Point Liquefied Natural Gas Terminal, Chesapeake Bay, Maryland.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Safety and Security Zone; Cove Point Liquefied Natural Gas Terminal, Chesapeake Bay, Maryland. 165.502 Section 165.502 Navigation and... Areas Fifth Coast Guard District § 165.502 Safety and Security Zone; Cove Point Liquefied Natural Gas...

  15. 29 CFR 1917.27 - Personnel.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) MARINE TERMINALS Marine Terminal Operations § 1917.27 Personnel. (a) Qualifications of machinery... code in use shall be permitted to operate a crane, winch or other power operated cargo handling apparatus, or any power operated vehicle, or give signals to the operator of any hoisting apparatus...

  16. 29 CFR 1917.27 - Personnel.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) MARINE TERMINALS Marine Terminal Operations § 1917.27 Personnel. (a) Qualifications of machinery... code in use shall be permitted to operate a crane, winch or other power operated cargo handling apparatus, or any power operated vehicle, or give signals to the operator of any hoisting apparatus...

  17. 29 CFR 1917.27 - Personnel.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) MARINE TERMINALS Marine Terminal Operations § 1917.27 Personnel. (a) Qualifications of machinery... code in use shall be permitted to operate a crane, winch or other power operated cargo handling apparatus, or any power operated vehicle, or give signals to the operator of any hoisting apparatus...

  18. Emission inventory estimation of an intercity bus terminal.

    PubMed

    Qiu, Zhaowen; Li, Xiaoxia; Hao, Yanzhao; Deng, Shunxi; Gao, H Oliver

    2016-06-01

    Intercity bus terminals are hotspots of air pollution due to concentrated activities of diesel buses. In order to evaluate the bus terminals' impact on air quality, it is necessary to estimate the associated mobile emission inventories. Since the vehicles' operating condition at the bus terminal varies significantly, conventional calculation of the emissions based on average emission factors suffers the loss of accuracy. In this study, we examined a typical intercity bus terminal-the Southern City Bus Station of Xi'an, China-using a multi-scale emission model-(US EPA's MOVES model)-to quantity the vehicle emission inventory. A representative operating cycle for buses within the station is constructed. The emission inventory was then estimated using detailed inputs including vehicle ages, operating speeds, operating schedules, and operating mode distribution, as well as meteorological data (temperature and humidity). Five functional areas (bus yard, platforms, disembarking area, bus travel routes within the station, and bus entrance/exit routes) at the terminal were identified, and the bus operation cycle was established using the micro-trip cycle construction method. Results of our case study showed that switching to compressed natural gas (CNG) from diesel fuel could reduce PM2.5 and CO emissions by 85.64 and 6.21 %, respectively, in the microenvironment of the bus terminal. When CNG is used, tail pipe exhaust PM2.5 emission is significantly reduced, even less than brake wear PM2.5. The estimated bus operating cycles can also offer researchers and policy makers important information for emission evaluation in the planning and design of any typical intercity bus terminals of a similar scale.

  19. Full wave modulator-demodulator amplifier apparatus. [for generating rectified output signal

    NASA Technical Reports Server (NTRS)

    Black, J. M. (Inventor)

    1974-01-01

    A full-wave modulator-demodulator apparatus is described including an operational amplifier having a first input terminal coupled to a circuit input terminal, and a second input terminal alternately coupled to the circuit input terminal. A circuit is ground by a switching circuit responsive to a phase reference signal and the operational amplifier is alternately switched between a non-inverting mode and an inverting mode. The switching circuit includes three field-effect transistors operatively associated to provide the desired switching function in response to an alternating reference signal of the same frequency as an AC input signal applied to the circuit input terminal.

  20. Methodologies for reducing truck turn time at marine container terminals.

    DOT National Transportation Integrated Search

    2005-05-01

    One of the prominent issues container terminal operators in the US are seeking to address is how to effectively : reduce truck turn time. Historically, truck turn time has received very little attention from terminal operators because port : congesti...

  1. 47 CFR 25.134 - Licensing provisions for Very Small Aperture Terminal (VSAT) and C-band Small Aperture Terminal...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Applications and Licenses Earth Stations § 25.134 Licensing provisions for Very Small Aperture Terminal (VSAT... affected adjacent satellite operators by the operation of the non-conforming earth station. (b) VSAT...) VSAT networks operating in the 12/14 GHz bands may use more than one hub earth station, and the hubs...

  2. XMGR5 users manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, K.R.; Fisher, J.E.

    1997-03-01

    ACE/gr is XY plotting tool for workstations or X-terminals using X. A few of its features are: User defined scaling, tick marks, labels, symbols, line styles, colors. Batch mode for unattended plotting. Read and write parameters used during a session. Polynomial regression, splines, running averages, DFT/FFT, cross/auto-correlation. Hardcopy support for PostScript, HP-GL, and FrameMaker.mif format. While ACE/gr has a convenient point-and-click interface, most parameter settings and operations are available through a command line interface (found in Files/Commands).

  3. Note on a modified return period scale for upper-truncated unbounded flood distributions

    NASA Astrophysics Data System (ADS)

    Bardsley, Earl

    2017-01-01

    Probability distributions unbounded to the right often give good fits to annual discharge maxima. However, all hydrological processes are in reality constrained by physical upper limits, though not necessarily well defined. A result of this contradiction is that for sufficiently small exceedance probabilities the unbounded distributions anticipate flood magnitudes which are impossibly large. This raises the question of whether displayed return period scales should, as is current practice, have some given number of years, such as 500 years, as the terminating rightmost tick-point. This carries the implication that the scale might be extended indefinitely to the right with a corresponding indefinite increase in flood magnitude. An alternative, suggested here, is to introduce a sufficiently high upper truncation point to the flood distribution and modify the return period scale accordingly. The rightmost tick-mark then becomes infinity, corresponding to the upper truncation point discharge. The truncation point is likely to be set as being above any physical upper bound and the return period scale will change only slightly over all practical return periods of operational interest. The rightmost infinity tick point is therefore proposed, not as an operational measure, but rather to signal in flood plots that the return period scale does not extend indefinitely to the right.

  4. Dynamic probability of reinforcement for cooperation: Random game termination in the centipede game.

    PubMed

    Krockow, Eva M; Colman, Andrew M; Pulford, Briony D

    2018-03-01

    Experimental games have previously been used to study principles of human interaction. Many such games are characterized by iterated or repeated designs that model dynamic relationships, including reciprocal cooperation. To enable the study of infinite game repetitions and to avoid endgame effects of lower cooperation toward the final game round, investigators have introduced random termination rules. This study extends previous research that has focused narrowly on repeated Prisoner's Dilemma games by conducting a controlled experiment of two-player, random termination Centipede games involving probabilistic reinforcement and characterized by the longest decision sequences reported in the empirical literature to date (24 decision nodes). Specifically, we assessed mean exit points and cooperation rates, and compared the effects of four different termination rules: no random game termination, random game termination with constant termination probability, random game termination with increasing termination probability, and random game termination with decreasing termination probability. We found that although mean exit points were lower for games with shorter expected game lengths, the subjects' cooperativeness was significantly reduced only in the most extreme condition with decreasing computer termination probability and an expected game length of two decision nodes. © 2018 Society for the Experimental Analysis of Behavior.

  5. War Termination: Dreaming of the End and the Ultimate Triumph

    DTIC Science & Technology

    2004-05-17

    and unstructured, art and science . To realize national strategic objectives and develop a triumphant peace, operational commanders must shun the...itself, war termination is both political and military, structured and unstructured, art and science . To realize national strategic objectives and...termination is political and military, structured and unstructured, art and science . By applying elements of operational art to war termination and

  6. 33 CFR 110.236 - Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal anchorages.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Pacific Ocean off Barbers Point... Grounds § 110.236 Pacific Ocean off Barbers Point, Island of Oahu, Hawaii: Offshore pipeline terminal... regulations. (1) No vessels may anchor, moor, or navigate in anchorages A, B, C, or D except: (i) Vessels...

  7. 14 CFR 129.11 - Amendment, suspension and termination of operations specifications.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Amendment, suspension and termination of operations specifications. 129.11 Section 129.11 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS OPERATIONS: FOREIGN AIR CARRIERS AND FOREIGN OPERATORS OF U.S.-REGISTERED AIRCRAFT...

  8. 14 CFR 129.11 - Amendment, suspension and termination of operations specifications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Amendment, suspension and termination of operations specifications. 129.11 Section 129.11 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS OPERATIONS: FOREIGN AIR CARRIERS AND FOREIGN OPERATORS OF U.S.-REGISTERED AIRCRAFT...

  9. 14 CFR 129.11 - Amendment, suspension and termination of operations specifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Amendment, suspension and termination of operations specifications. 129.11 Section 129.11 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS OPERATIONS: FOREIGN AIR CARRIERS AND FOREIGN OPERATORS OF U.S.-REGISTERED AIRCRAFT...

  10. Achieving Operational Two-Way Laser Acquisition for OPALS Payload on the International Space Station

    NASA Technical Reports Server (NTRS)

    Abrahamson, Matthew J.; Oaida, Bogdan V.; Sindiy, Oleg; Biswas, Abhijit

    2015-01-01

    The Optical PAyload for Lasercomm Science (OPALS) experiment was installed on the International Space Station (ISS) in April 2014. Developed as a technology demonstration, its objective was to experiment with space-to-ground optical communications transmissions from Low Earth Orbit. More than a dozen successful optical links were established between a Wrightwood, California-based ground telescope and the OPALS flight terminal from June 2014 to September 2014. Each transmission required precise bi-directional pointing to be maintained between the space-based transmitter and ground-based receiver. This was accomplished by acquiring and tracking a laser beacon signal transmitted from the ground telescope to the OPALS flight terminal on the ISS. OPALS demonstrated the ability to nominally acquire the beacon within three seconds at 25deg elevation and maintain lock within 140 µrad (3(sigma)) for the full 150-second transmission duration while slewing at rates up to 1deg/sec. Additional acquisition attempts in low elevation and weather-challenged conditions provided valuable insight on the optical link robustness under off-nominal operational conditions.

  11. Low-loss reciprocal optical terminals for two-way time-frequency transfer.

    PubMed

    Swann, W C; Sinclair, L C; Khader, I; Bergeron, H; Deschênes, J-D; Newbury, N R

    2017-12-01

    We present the design and performance of a low-cost, reciprocal, compact free-space terminal employing tip/tilt pointing compensation that enables optical two-way time-frequency transfer over free-space links across the turbulent atmosphere. The insertion loss of the terminals is ∼1.5  dB with total link losses of 15 dB, 24 dB, and 50 dB across horizontal, turbulent 2-km, 4-km, and 12-km links, respectively. The effects of turbulence on pointing control and aperture size, and their influence on the terminal design, are discussed.

  12. 49 CFR 1242.67 - Switch crews; controlling operations; yard and terminal clerical; locomotive fuel; electric power...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Switch crews; controlling operations; yard and terminal clerical; locomotive fuel; electric power purchased/produced for motive power; operating switches... SERVICE FOR RAILROADS 1 Operating Expenses-Transportation § 1242.67 Switch crews; controlling operations...

  13. 49 CFR 1242.67 - Switch crews; controlling operations; yard and terminal clerical; locomotive fuel; electric power...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Switch crews; controlling operations; yard and terminal clerical; locomotive fuel; electric power purchased/produced for motive power; operating switches... SERVICE FOR RAILROADS 1 Operating Expenses-Transportation § 1242.67 Switch crews; controlling operations...

  14. 49 CFR 1242.67 - Switch crews; controlling operations; yard and terminal clerical; locomotive fuel; electric power...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Switch crews; controlling operations; yard and terminal clerical; locomotive fuel; electric power purchased/produced for motive power; operating switches... SERVICE FOR RAILROADS 1 Operating Expenses-Transportation § 1242.67 Switch crews; controlling operations...

  15. 49 CFR 1242.67 - Switch crews; controlling operations; yard and terminal clerical; locomotive fuel; electric power...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Switch crews; controlling operations; yard and terminal clerical; locomotive fuel; electric power purchased/produced for motive power; operating switches... SERVICE FOR RAILROADS 1 Operating Expenses-Transportation § 1242.67 Switch crews; controlling operations...

  16. 46 CFR 525.1 - Purpose and scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR... terminal schedule during which cargo may occupy space assigned to it on terminal property, including off... usages, customs or modes of operation which in any way affect, determine or change the rates, charges or...

  17. 46 CFR 525.1 - Purpose and scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR... terminal schedule during which cargo may occupy space assigned to it on terminal property, including off... usages, customs or modes of operation which in any way affect, determine or change the rates, charges or...

  18. 46 CFR 525.1 - Purpose and scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR... terminal schedule during which cargo may occupy space assigned to it on terminal property, including off... usages, customs or modes of operation which in any way affect, determine or change the rates, charges or...

  19. Environmental parameters of the Tennessee River in Alabama. 1: Thermal stratification

    NASA Technical Reports Server (NTRS)

    Rosing, L. M.

    1976-01-01

    Thermal stratification data of a transect across Wheeler Reservoir are correlated with the climatological data at the time of sampling. This portion of the Tennessee River is used as a heat sink for the effluent from the three reactor Browns Ferry Nuclear Power Plant. The transect sampling line is 1.3 miles below this point of effluence. Data are presented by weekly samplings for one year prior to plant operations. Post-operational data are presented with one reactor in operation and with two reactors in partial operation. Data gathering was terminated when the plant ceased operations. The results indicate that the effluent for partial plant operation were inconclusive. As a result, recommendations include continuing the sampling when the plant resumes operation at full capacity. Recommendations also include developing math models with the presented thermal and climatological data to be used for predicting the effluent impact in the river with varying climatological conditions and also to predict the effectiveness of the cooling towers.

  20. Internet Connections: Understanding Your Access Options.

    ERIC Educational Resources Information Center

    Notess, Greg R.

    1994-01-01

    Describes levels of Internet connectivity, physical connections, and connection speeds. Compares options for connecting to the Internet, including terminal accounts, dial-up terminal accounts, direct connections through a local area network, and direct connections using SLIP (Serial Line Internet Protocol) or PPP (Point-to-Point Protocol). (eight…

  1. Using Information From Prior Satellite Scans to Improve Cloud Detection Near the Day-Night Terminator

    NASA Technical Reports Server (NTRS)

    Yost, Christopher R.; Minnis, Patrick; Trepte, Qing Z.; Palikonda, Rabindra; Ayers, Jeffrey K.; Spangenberg, Doulas A.

    2012-01-01

    With geostationary satellite data it is possible to have a continuous record of diurnal cycles of cloud properties for a large portion of the globe. Daytime cloud property retrieval algorithms are typically superior to nighttime algorithms because daytime methods utilize measurements of reflected solar radiation. However, reflected solar radiation is difficult to accurately model for high solar zenith angles where the amount of incident radiation is small. Clear and cloudy scenes can exhibit very small differences in reflected radiation and threshold-based cloud detection methods have more difficulty setting the proper thresholds for accurate cloud detection. Because top-of-atmosphere radiances are typically more accurately modeled outside the terminator region, information from previous scans can help guide cloud detection near the terminator. This paper presents an algorithm that uses cloud fraction and clear and cloudy infrared brightness temperatures from previous satellite scan times to improve the performance of a threshold-based cloud mask near the terminator. Comparisons of daytime, nighttime, and terminator cloud fraction derived from Geostationary Operational Environmental Satellite (GOES) radiance measurements show that the algorithm greatly reduces the number of false cloud detections and smoothes the transition from the daytime to the nighttime clod detection algorithm. Comparisons with the Geoscience Laser Altimeter System (GLAS) data show that using this algorithm decreases the number of false detections by approximately 20 percentage points.

  2. Gain-switching characteristics and fast transient response of three-terminal size-effect modulation laser

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Suemune, I.; Takeoka, T.; Yamanashi, M.

    1986-09-01

    Gain-switching characteristics of the proposed size-effect modulation light sources are investigated. For realizing the laser operation, the consideration of the screening effect on the applied electric fields due to the high concentration of carriers is indispensable. In this respect, the authors propose a separate-confinement-hereto-multiple-quantum-well (SCH-MQW) structure as the most suitable one for gain switching. The key point of the structure is the sufficiently high heterobarriers at the clad-barrier interfaces to prevent carrier leakage. The examinations of the transient response clarify that they are principally photon-lifetime limited. Employing the three-terminal character of the proposed laser, the fast pulse modulation up tomore » 12 Gbits/s, which is almost free from the relaxation oscillations and the pattern effects, is predicted.« less

  3. Application of modern control theory to scheduling and path-stretching maneuvers of aircraft in the near terminal area

    NASA Technical Reports Server (NTRS)

    Athans, M.

    1974-01-01

    A design concept of the dynamic control of aircraft in the near terminal area is discussed. An arbitrary set of nominal air routes, with possible multiple merging points, all leading to a single runway, is considered. The system allows for the automated determination of acceleration/deceleration of aircraft along the nominal air routes, as well as for the automated determination of path-stretching delay maneuvers. In addition to normal operating conditions, the system accommodates: (1) variable commanded separations over the outer marker to allow for takeoffs and between successive landings and (2) emergency conditions under which aircraft in distress have priority. The system design is based on a combination of three distinct optimal control problems involving a standard linear-quadratic problem, a parameter optimization problem, and a minimum-time rendezvous problem.

  4. Air Traffic Management Technology Demonstration-1 Concept of Operations (ATD-1 ConOps)

    NASA Technical Reports Server (NTRS)

    Baxley, Brian T.; Johnson, William C.; Swenson, Harry; Robinson, John E.; Prevot, Thomas; Callantine, Todd; Scardina, John; Greene, Michael

    2012-01-01

    The operational goal of the ATD-1 ConOps is to enable aircraft, using their onboard FMS capabilities, to fly Optimized Profile Descents (OPDs) from cruise to the runway threshold at a high-density airport, at a high throughput rate, using primarily speed control to maintain in-trail separation and the arrival schedule. The three technologies in the ATD-1 ConOps achieve this by calculating a precise arrival schedule, using controller decision support tools to provide terminal controllers with speeds for aircraft to fly to meet times at a particular meter points, and onboard software providing flight crews with speeds for the aircraft to fly to achieve a particular spacing behind preceding aircraft.

  5. Operation and evaluation of the terminal configured vehicle mission simulator in an automated terminal area metering and spacing ATC environment

    NASA Technical Reports Server (NTRS)

    Houck, J. A.

    1979-01-01

    The development of a mission simulator for use in the Terminal Configured Vehicle (TCV) program is outlined. The broad objectives of the TCV program are to evaluate new concepts in airborne systems and in operational flight procedures. These evaluations are directed toward improving terminal area capacity and efficiency, improving approach and landing capability in adverse weather, and reducing noise impact in the terminal area. A description is given of the design features and operating principles of the two major components of the TCV Mission Simulator: the TCV Aft Flight Deck Simulation and the Terminal Area Air Traffic Model Simulation, and their merger to form the TCV Mission Simulator. The first research study conducted in the Mission Simulator is presented along with some preliminary results.

  6. Ultra Small Aperture Terminal for Ka-Band SATCOM

    NASA Technical Reports Server (NTRS)

    Acosta, Roberto; Reinhart, Richard; Lee, Richard; Simons, Rainee

    1997-01-01

    An ultra small aperture terminal (USAT) at Ka-band frequency has been developed by Lewis Research Center (LeRC) for data rates up to 1.5 Mbps in the transmit mode and 40 Mbps in receive mode. The terminal consists of a 35 cm diameter offset-fed parabolic antenna which is attached to a solid state power amplifier and low noise amplifier. A single down converter is used to convert the Ka-band frequency to 70 MHz intermediate frequency (IF). A variable rate (9.6 Kbps to 10 Mbps) commercial modem with a standard RS-449/RS-232 interface is used to provide point-to-point digital services. The terminal has been demonstrated numerous times using the Advanced Communications Technology Satellite (ACTS) and the 4.5 in Link Evaluation Terminal (LET) in Cleveland. A conceptual design for an advanced terminal has also been developed. This advanced USAT utilizes Microwave Monolithic Integrated Circuit (MMIC) and flat plate array technologies. This terminal will be self contained in a single package which will include a 1 watt solid state amplifier (SSPA), low noise amplifier (LNA) and a modem card located behind the aperture of the array. The advanced USAT will be light weight, transportable, low cost and easy to point to the satellite. This paper will introduce designs for the reflector based and array based USAT's.

  7. A Conceptual Design of a Departure Planner Decision Aid

    NASA Technical Reports Server (NTRS)

    Anagnostakis, Ioannis; Idris, Husni R.; Clark, John-Paul; Feron, Eric; Hansman, R. John; Odoni, Amedeo R.; Hall, William D.

    2000-01-01

    Terminal area Air Traffic Management handles both arriving and departing traffic. To date, research work on terminal area operations has focused primarily on the arrival flow and typically departures are taken into account only in an approximate manner. However, arrivals and departures are highly coupled processes especially in the terminal airspace, with complex interactions and sharing of the same airport resources between arrivals and departures taking place in practically every important terminal area. Therefore, the addition of automation aids for departures, possibly in co-operation with existing arrival flow automation systems, could have a profound contribution in enhancing the overall efficiency of airport operations. This paper presents the conceptual system architecture for such an automation aid, the Departure Planner (DP). This architecture can be used as a core in the development of decision-aiding systems to assist air traffic controllers in improving the performance of departure operations and optimize runway time allocation among different operations at major congested airports. The design of such systems is expected to increase the overall efficiency of terminal area operations and yield benefits for all stakeholders involved in Air Traffic Management (ATM) operations, users as well as service providers.

  8. Terminal Air Flow Planning

    NASA Technical Reports Server (NTRS)

    Denery, Dallas G.; Erzberger, Heinz; Edwards, Thomas A. (Technical Monitor)

    1998-01-01

    The Center TRACON Automation System (CTAS) will be the basis for air traffic planning and control in the terminal area. The system accepts arriving traffic within an extended terminal area and optimizes the flow based on current traffic and airport conditions. The operational use of CTAS will be presented together with results from current operations.

  9. Telerobot control system

    NASA Technical Reports Server (NTRS)

    Backes, Paul G. (Inventor); Tso, Kam S. (Inventor)

    1993-01-01

    This invention relates to an operator interface for controlling a telerobot to perform tasks in a poorly modeled environment and/or within unplanned scenarios. The telerobot control system includes a remote robot manipulator linked to an operator interface. The operator interface includes a setup terminal, simulation terminal, and execution terminal for the control of the graphics simulator and local robot actuator as well as the remote robot actuator. These terminals may be combined in a single terminal. Complex tasks are developed from sequential combinations of parameterized task primitives and recorded teleoperations, and are tested by execution on a graphics simulator and/or local robot actuator, together with adjustable time delays. The novel features of this invention include the shared and supervisory control of the remote robot manipulator via operator interface by pretested complex tasks sequences based on sequences of parameterized task primitives combined with further teleoperation and run-time binding of parameters based on task context.

  10. Advanced Command Destruct System (ACDS) Enhanced Flight Termination System (EFTS)

    NASA Technical Reports Server (NTRS)

    Tow, David K.

    2011-01-01

    This presentation provides information on the development, integration, and operational usage of the Enhanced Flight Termination System (EFTS) at NASA Dryden Flight Research Center and Air Force Flight Test Center. The presentation will describe the efforts completed to certify the system and acquire approval for operational usage, the efforts to integrate the system into the NASA Dryden existing flight termination infrastructure, and the operational support of aircraft with EFTS at Edwards AFB.

  11. 49 CFR 639.31 - Early lease termination or modification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... lease costs, which exceeds the purchase costs as calculated under subpart C of this part for the period of the lease up to the point of termination. (b) Penalties resulting from early termination of a...

  12. N-terminal-mediated oligomerization of DnaA drives the occupancy-dependent rejuvenation of the protein on the membrane.

    PubMed

    Aranovich, Alexander; Braier-Marcovitz, Shani; Ansbacher, Esti; Granek, Rony; Parola, Abraham H; Fishov, Itzhak

    2015-08-13

    DnaA, the initiator of chromosome replication in most known eubacteria species, is activated once per cell division cycle. Its overall activity cycle is driven by ATP hydrolysis and ADP-ATP exchange. The latter can be promoted by binding to specific sequences on the chromosome and/or to acidic phospholipids in the membrane. We have previously shown that the transition into an active form (rejuvenation) is strongly co-operative with respect to DnaA membrane occupancy. Only at low membrane occupancy is DnaA reactivation efficiently catalysed by the acidic phospholipids. The present study was aimed at unravelling the molecular mechanism underlying the occupancy-dependent DnaA rejuvenation. We found that truncation of the DnaA N-terminal completely abolishes the co-operative transformation between the high and low occupancy states (I and II respectively) without affecting the membrane binding. The environmentally sensitive fluorophore specifically attached to the N-terminal cysteines of DnaA reported on occupancy-correlated changes in its vicinity. Cross-linking of DnaA with a short homobifunctional reagent revealed that state II of the protein on the membrane corresponds to a distinct oligomeric form of DnaA. The kinetic transition of DnaA on the membrane surface is described in the present study by a generalized 2D condensation phase transition model, confirming the existence of two states of DnaA on the membrane and pointing to the possibility that membrane protein density serves as an on-off switch in vivo. We conclude that the DnaA conformation attained at low surface density drives its N-terminal-mediated oligomerization, which is presumably a pre-requisite for facilitated nt exchange. © 2015 Authors.

  13. FORTRAN plotting subroutines for the space plasma laboratory

    NASA Technical Reports Server (NTRS)

    Williams, R.

    1983-01-01

    The computer program known as PLOTRW was custom made to satisfy some of the graphics requirements for the data collected in the Space Plasma Laboratory at the Johnson Space Center (JSC). The general requirements for the program were as follows: (1) all subroutines shall be callable through a FORTRAN source program; (2) all graphs shall fill one page and be properly labeled; (3) there shall be options for linear axes and logarithmic axes; (4) each axis shall have tick marks equally spaced with numeric values printed at the beginning tick mark and at the last tick mark; and (5) there shall be three options for plotting. These are: (1) point plot, (2) line plot and (3) point-line plot. The subroutines were written in FORTRAN IV for the LSI-11 Digital equipment Corporation (DEC) Computer. The program is now operational and can be run on any TEKTRONICX graphics terminal that uses a DEC Real-Time-11 (RT-11) operating system.

  14. Measurements for assessing the exposure from 3G femtocells.

    PubMed

    Boursianis, Achilles; Vanias, Pantelis; Samaras, Theodoros

    2012-06-01

    Femtocells are low-power access points, which combine mobile and broadband technologies. The main operation of a femtocell is to function as a miniature base station unit in an indoor environment and to connect to the operator's network through a broadband phone line or a coaxial cable line. This study provides the first experimental measurements and results in Greece for the assessment of exposure to a femtocell access point (FAP) indoors. Using a mobile handset with the appropriate software, power level measurements of the transmitted (Tx) and the received by the mobile handset signal were performed in two different and typical (home and office) environments. Moreover, radiofrequency electric field strength and frequency selective measurements with a radiation meter (SRM-3000) were carried out in the proximity of the FAP installation point. The cumulative distribution functions of the Tx power at most cases (except one) show that in 90% of all points the power of the mobile phone was lower by at least 7 dB during FAP operation. At a distance of ∼1 m from the FAP (in its main beam), power flux density measurements show that there is very little difference between the two situations (FAP ON and OFF). As a conclusion, the use of femtocells indoors improves reception quality, reduces the Tx power of the user's mobile terminal and results in an indiscernible increase of the electromagnetic field in front of the unit, at values that are extremely low compared with reference levels of exposure guidelines.

  15. Operational benefits from the terminal configured vehicle

    NASA Technical Reports Server (NTRS)

    Reeder, J. P.; Schmitz, R. A.; Clark, L. V.

    1979-01-01

    The NASA Terminal Configured Vehicle is a flying laboratory used to conduct research and development on improved airborne systems (including avionics) and operational flight procedures, with particular emphasis on utilization in the terminal area environment. The objectives of this technology development activity, focused on conventional transport aircraft, are to develop and demonstrate improvements which can lead to increased airport and runway capacity, increased air traffic controller productivity, energy efficient terminal area operations, reduced weather minima with safety, and reduced community noise by use of appropriate procedures. This paper discusses some early results of this activity in addition to defining present efforts and future research plans.

  16. 75 FR 64683 - Liability for Termination of Single-Employer Plans; Treatment of Substantial Cessation of Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ... Termination of Single-Employer Plans; Treatment of Substantial Cessation of Operations AGENCY: Pension Benefit... cessations of operations by employers that maintain single-employer plans. DATES: Comments must be submitted... 4062(e), which provides for reporting of and liability for certain substantial cessations of operations...

  17. [Effect of hydroxyethyl starch 130/0.4 on S100B protein level and cerebral oxygen metabolism in open cardiac surgery under cardiopulmonary bypass].

    PubMed

    Pi, Zhi-bing; Tan, Guan-xian; Wang, Jun-lu

    2007-07-17

    To observe the effect of hydroxyethyl starch (HES) 130/0.4 on S100B protein level and cerebral metabolism of oxygen in open cardiac surgery under cardiopulmonary bypass (CPB) and to explore whether it has the protective effect of 6%HES130/0.4 as priming solution on cerebral injury during CPB and explore the probable mechanism. Forty patients with atrioseptal defect or ventricular septal defect scheduled for elective surgical repair under CPB with moderate hypothermia were randomly divided into two equal groups: HES 130/0.4 group (HES group) in which HES 130/0.4 (voluven) was used as priming solution and gelatin group (GRL group) in which gelofusine (succinylated gelatin) was used as priming solution. ECG, heart rate (HR), blood pressure (BP), mean arterial pressure (MAP), central venous pressure (CVP), arterial partial pressure of oxygen (P(a)O(2),), arterial partial pressure of carbon dioxide (P(et)CO(2)) and body temperature (naso-pharyngeal and rectal) were continuously monitored during the operation. Blood samples were obtained from the central vein for determination of blood concentrations of S100B protein at the following time points: before CPB (T(0)), 20 minutes after the beginning of CPB (T(1)), immediately after the termination of CPB (T(2)), 60 minutes after the termination of CPB (T(3)), and 24 hours after the termination of CPB (T(4)). The serum S100B protein levels were measured by ELISA. At the same time points blood samples were obtained from the jugular vein and radial artery to undergo blood gas analysis and measurement of blood glucose, based on which the cerebral oxygen metabolic rate/cerebral metabolic rate of glucose (CMRO(2)/CMR(GLU)) was calculated. Compared with the time point of immediately before CPB (T(0)), The S100B protein level of the 2 groups began to increase since the time point T(1), peaked at the time point T(2), began to decrease gradually since the time point T(3), and were still significantly higher than those before CPB at the time point T(4) (all P < 0.01), and the S100B protein levels at different time points of the HES group were all significantly lower than those of the GEL group (all P < 0.01). The S(jv)O(2) and CMRO(2)/CMR(GLU) levels of both groups increased at the time point T(1), decreased at the time points T(2) and T(3), and then restored to normal at the time points T(4). In the GEL group there were no significant differences in the levels between any 2 different time points, however, in the HES group S(jv)O(2) and CMRO(2)/CMR(GLU) levels at T(1) was significantly higher than those at the other time points (P < 0.05 or P < 0.01). S100B protein increases significantly in open cardiac surgery under CPB. HES130/0.4 lowers the S100B protein levels from the beginning of CPB to one hour after the termination of CPB with the probable mechanism of improving the cerebral metabolism of oxygen. 6%HES130/0.4 as priming solution may play a protective role in reduction of cerebral injury during CPB and open cardiac surgery.

  18. Free-space laser communication technologies III; Proceedings of the Meeting, Los Angeles, CA, Jan. 21, 22, 1991

    NASA Technical Reports Server (NTRS)

    Begley, David L. (Editor); Seery, Bernard D. (Editor)

    1991-01-01

    The present volume on free-space laser communication technologies discusses system analysis, performance, and applications, pointing, acquisition, and tracking in beam control, laboratory demonstration systems, and transmitter and critical component technologies. Attention is given to a space station laser communication transceiver, meeting intersatellite links mission requirements by an adequate optical terminal design, an optical approach to proximity-operations communications for Space Station Freedom, and optical space-to-ground link availability assessment and diversity requirements. Topics addressed include nonmechanical steering of laser beams by multiple aperture antennas, a free-space simulator for laser transmission, heterodyne acquisition and tracking in a free-space diode laser link, and laser terminal attitude determination via autonomous star tracking. Also discussed are stability considerations in relay lens design for optical communications, liquid crystals for lasercom applications, and narrowband optical interference filters.

  19. Partial reinforcement (acquisition) effects within subjects

    PubMed Central

    Amsel, Abram; MacKinnon, John R.; Rashotte, Michael E.; Surridge, C. Thomas

    1964-01-01

    Acquisition performance of 22 rats in a straight alley runway was examined. The animals were subjected to partial reinforcement when the alley was black (B±) and continuous reinforcement when it was white (W+). The results indicated (a) higher terminal performance, for partial as against continuous reinforcement conditions, for starting-time and running-time measures, and (b) lower terminal performance under partial conditions for a goal-entry-time measure. These results confirm within subjects an effect previously demonstrated, in the runway, only in between-groups tests, where one group is run under partial reinforcement and a separate group is run under continuous reinforcement in the presence of the same external stimuli. Differences between the runway situation, employing a discrete-trial procedure and performance measures at three points in the response chain, and the Skinner box situation, used in its free-operant mode with a single performance measure, are discussed in relation to the present findings. PMID:14130088

  20. PARTIAL REINFORCEMENT (ACQUISITION) EFFECTS WITHIN SUBJECTS.

    PubMed

    AMSEL, A; MACKINNON, J R; RASHOTTE, M E; SURRIDGE, C T

    1964-03-01

    Acquisition performance of 22 rats in a straight alley runway was examined. The animals were subjected to partial reinforcement when the alley was black (B+/-) and continuous reinforcement when it was white (W+). The results indicated (a) higher terminal performance, for partial as against continuous reinforcement conditions, for starting-time and running-time measures, and (b) lower terminal performance under partial conditions for a goal-entry-time measure. These results confirm within subjects an effect previously demonstrated, in the runway, only in between-groups tests, where one group is run under partial reinforcement and a separate group is run under continuous reinforcement in the presence of the same external stimuli. Differences between the runway situation, employing a discrete-trial procedure and performance measures at three points in the response chain, and the Skinner box situation, used in its free-operant mode with a single performance measure, are discussed in relation to the present findings.

  1. 75 FR 74768 - Madison Terminal Railway, LLC-Lease and Operation Exemption-Line of Railroad in Dane County, WI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35433] Madison Terminal Railway, LLC--Lease and Operation Exemption-- Line of Railroad in Dane County, WI Madison Terminal Railway... Industrial Lead at milepost 78.02 in Madison, WI, and is located entirely within the property of ProBuild...

  2. 42 CFR 423.509 - Termination of contract by CMS.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: (1) Termination of contract by CMS. (i) CMS notifies the Part D plan in writing 90 days before the... difficulties so severe that its ability to make necessary health services available is impaired to the point of... writing that its contract will be terminated on a date specified by CMS. If a termination in is effective...

  3. 42 CFR 423.509 - Termination of contract by CMS.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: (1) Termination of contract by CMS. (i) CMS notifies the Part D plan in writing 90 days before the... difficulties so severe that its ability to make necessary health services available is impaired to the point of... writing that its contract will be terminated on a date specified by CMS. If a termination in is effective...

  4. 1. Occident Terminal Elevator and annex, (l)1930/workhouse and annex 1925 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Occident Terminal Elevator and annex, (l)-1930/workhouse and annex 1925 with train shed Peavey Duluth Terminal Annex on left 1930-workhouse 1908 (white silos). - Occident Terminal Elevator & Storage Annex, South side of second slip, north from outer end of Rice's Point, east of Garfield Avenue, Duluth, St. Louis County, MN

  5. A stochastic discrete optimization model for designing container terminal facilities

    NASA Astrophysics Data System (ADS)

    Zukhruf, Febri; Frazila, Russ Bona; Burhani, Jzolanda Tsavalista

    2017-11-01

    As uncertainty essentially affect the total transportation cost, it remains important in the container terminal that incorporates several modes and transshipments process. This paper then presents a stochastic discrete optimization model for designing the container terminal, which involves the decision of facilities improvement action. The container terminal operation model is constructed by accounting the variation of demand and facilities performance. In addition, for illustrating the conflicting issue that practically raises in the terminal operation, the model also takes into account the possible increment delay of facilities due to the increasing number of equipment, especially the container truck. Those variations expectantly reflect the uncertainty issue in the container terminal operation. A Monte Carlo simulation is invoked to propagate the variations by following the observed distribution. The problem is constructed within the framework of the combinatorial optimization problem for investigating the optimal decision of facilities improvement. A new variant of glow-worm swarm optimization (GSO) is thus proposed for solving the optimization, which is rarely explored in the transportation field. The model applicability is tested by considering the actual characteristics of the container terminal.

  6. 14 CFR 415.127 - Flight safety system design and operation data.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Expendable Launch Vehicle From a Non-Federal Launch Site § 415.127 Flight safety system design and operation...: flight termination system; command control system; tracking; telemetry; communications; flight safety... control system. (7) Flight termination system component storage, operating, and service life. A listing of...

  7. Design and Realization of Silhouette Operation Platform Based on GIS

    NASA Astrophysics Data System (ADS)

    Fu, Jia; Cui, Xinqiang; Yuan, Zhengteng

    2018-01-01

    Artificial weather effects after several generations of unremitting efforts in many provinces, municipalities and districts have become a regular business to serve the community. In the actual operation of the actual impact of weather operations, onsite job terminal system functional integration is not high, such as the operation process cumbersome operation instructions unreasonable, the weather data lag, the data form of a single factor and other factors seriously affect the weather conditions, Sexual and intuitive improvement. Therefore, this paper adopts the Android system as the carrier for the design and implementation of the silhouette intelligent terminal system. The intelligent terminal system has carried on the preliminary deployment trial in the real-time intelligent command system which realizes the weather operation in a province, and has formed a centralized, unified and digital artificial influence in combination with the self-developed multi-function server system platform and the remote centre command system Weather operation communication network, to achieve intelligent terminal and remote centre commander between the efficient, timely and stable information exchange, improve the shadow of the economic and social benefits, basically reached the initial design purpose.

  8. New design and operating techniques and requirements for improved aircraft terminal area operations

    NASA Technical Reports Server (NTRS)

    Reeder, J. P.; Taylor, R. T.; Walsh, T. M.

    1974-01-01

    Current aircraft operating problems that must be alleviated for future high-density terminal areas are safety, dependence on weather, congestion, energy conservation, noise, and atmospheric pollution. The Microwave Landing System (MLS) under development by FAA provides increased capabilities over the current ILS. The development of the airborne system's capability to take maximum advantage of the MLS capabilities in order to solve terminal area problems are discussed. A major limiting factor in longitudinal spacing for capacity increase is the trailing vortex hazard. Promising methods for causing early dissipation of the vortices were explored. Flight procedures for avoiding the hazard were investigated. Terminal configured vehicles and their flight test development are discussed.

  9. Review of the development of multi-terminal HVDC and DC power grid

    NASA Astrophysics Data System (ADS)

    Chen, Y. X.

    2017-11-01

    Traditional power equipment, power-grid structures, and operation technology are becoming increasingly powerless with the large-scale renewable energy access to the grid. Thus, we must adopt new technologies, new equipment, and new grid structure to satisfy future requirements in energy patterns. Accordingly, the multiterminal direct current (MTDC) transmission system is receiving increasing attention. This paper starts with a brief description of current developments in MTDC worldwide. The MTDC project, which has been placed into practical operation, is introduced by the Italian-Corsica-Sardinian three-terminal high-voltage DC (HVDC) project. We then describe the basic characteristics and regulations of multiterminal DC transmission. The current mainstream of several control methods are described. In the third chapter, the key to the development of MTDC system or hardware and software technology that restricts the development of multiterminal DC transmission is discussed. This chapter focuses on the comparison of double-ended HVDC and multiterminal HVDC in most aspects and subsequently elaborates the key and difficult point of MTDC development. Finally, this paper summarizes the prospect of a DC power grid. In a few decades, China can build a strong cross-strait AC-DC hybrid power grid.

  10. 78 FR 5840 - Notice of License Termination for University of Illinois Advanced TRIGA Reactor, License No. R-115

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... University of Illinois Advanced TRIGA Reactor, License No. R-115 The U.S. Nuclear Regulatory Commission (NRC) is noticing the termination of Facility Operating License No. R-115, for the University of Illinois... Operating License No. R-115 is terminated. The above referenced documents may be examined, and/or copied for...

  11. 78 FR 26799 - Waterway Suitability Assessment for Expansion of Liquefied Gas Terminals; Beaumont, TX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... and request for comments. SUMMARY: In accordance with Coast Guard regulations, Martin Operating.... Martin Operating Partnership's Stanolind Cut Terminal in Beaumont, Texas submitted an LOI on January 25... refer to NVIC 01-2011 for process information and guidance in evaluating Martin Operating Partnership LP...

  12. Evaluation of the Terminal Precision Scheduling and Spacing System for Near-Term NAS Application

    NASA Technical Reports Server (NTRS)

    Thipphavong, Jane; Martin, Lynne Hazel; Swenson, Harry N.; Lin, Paul; Nguyen, Jimmy

    2012-01-01

    NASA has developed a capability for terminal area precision scheduling and spacing (TAPSS) to provide higher capacity and more efficiently manage arrivals during peak demand periods. This advanced technology is NASA's vision for the NextGen terminal metering capability. A set of human-in-the-loop experiments was conducted to evaluate the performance of the TAPSS system for near-term implementation. The experiments evaluated the TAPSS system under the current terminal routing infrastructure to validate operational feasibility. A second goal of the study was to measure the benefit of the Center and TRACON advisory tools to help prioritize the requirements for controller radar display enhancements. Simulation results indicate that using the TAPSS system provides benefits under current operations, supporting a 10% increase in airport throughput. Enhancements to Center decision support tools had limited impact on improving the efficiency of terminal operations, but did provide more fuel-efficient advisories to achieve scheduling conformance within 20 seconds. The TRACON controller decision support tools were found to provide the most benefit, by improving the precision in schedule conformance to within 20 seconds, reducing the number of arrivals having lateral path deviations by 50% and lowering subjective controller workload. Overall, the TAPSS system was found to successfully develop an achievable terminal arrival metering plan that was sustainable under heavy traffic demand levels and reduce the complexity of terminal operations when coupled with the use of the terminal controller advisory tools.

  13. 47 CFR 68.610 - Database of terminal equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Database of terminal equipment. 68.610 Section... Attachments § 68.610 Database of terminal equipment. (a) The Administrative Council for Terminal Attachments shall operate and maintain a database of all approved terminal equipment. The database shall meet the...

  14. 47 CFR 68.610 - Database of terminal equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Database of terminal equipment. 68.610 Section... Attachments § 68.610 Database of terminal equipment. (a) The Administrative Council for Terminal Attachments shall operate and maintain a database of all approved terminal equipment. The database shall meet the...

  15. 47 CFR 68.610 - Database of terminal equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 3 2013-10-01 2013-10-01 false Database of terminal equipment. 68.610 Section... Attachments § 68.610 Database of terminal equipment. (a) The Administrative Council for Terminal Attachments shall operate and maintain a database of all approved terminal equipment. The database shall meet the...

  16. 47 CFR 68.610 - Database of terminal equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 3 2014-10-01 2014-10-01 false Database of terminal equipment. 68.610 Section... Attachments § 68.610 Database of terminal equipment. (a) The Administrative Council for Terminal Attachments shall operate and maintain a database of all approved terminal equipment. The database shall meet the...

  17. 47 CFR 68.610 - Database of terminal equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 3 2012-10-01 2012-10-01 false Database of terminal equipment. 68.610 Section... Attachments § 68.610 Database of terminal equipment. (a) The Administrative Council for Terminal Attachments shall operate and maintain a database of all approved terminal equipment. The database shall meet the...

  18. 46 CFR 535.309 - Marine terminal services agreements-exemption.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 9 2011-10-01 2011-10-01 false Marine terminal services agreements-exemption. 535.309... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.309 Marine terminal services agreements—exemption. (a) Marine terminal services agreement...

  19. 46 CFR 535.309 - Marine terminal services agreements-exemption.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 9 2013-10-01 2013-10-01 false Marine terminal services agreements-exemption. 535.309... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.309 Marine terminal services agreements—exemption. (a) Marine terminal services agreement...

  20. 46 CFR 535.310 - Marine terminal facilities agreement-exemption.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Marine terminal facilities agreement-exemption. 535.310... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.310 Marine terminal facilities agreement—exemption. (a) Marine terminal facilities agreement...

  1. 46 CFR 535.310 - Marine terminal facilities agreement-exemption.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 9 2012-10-01 2012-10-01 false Marine terminal facilities agreement-exemption. 535.310... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.310 Marine terminal facilities agreement—exemption. (a) Marine terminal facilities agreement...

  2. 46 CFR 535.310 - Marine terminal facilities agreement-exemption.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 9 2011-10-01 2011-10-01 false Marine terminal facilities agreement-exemption. 535.310... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.310 Marine terminal facilities agreement—exemption. (a) Marine terminal facilities agreement...

  3. 46 CFR 535.309 - Marine terminal services agreements-exemption.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Marine terminal services agreements-exemption. 535.309... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.309 Marine terminal services agreements—exemption. (a) Marine terminal services agreement...

  4. 46 CFR 535.309 - Marine terminal services agreements-exemption.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 9 2014-10-01 2014-10-01 false Marine terminal services agreements-exemption. 535.309... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.309 Marine terminal services agreements—exemption. (a) Marine terminal services agreement...

  5. 46 CFR 535.310 - Marine terminal facilities agreement-exemption.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 9 2014-10-01 2014-10-01 false Marine terminal facilities agreement-exemption. 535.310... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.310 Marine terminal facilities agreement—exemption. (a) Marine terminal facilities agreement...

  6. 46 CFR 535.309 - Marine terminal services agreements-exemption.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 9 2012-10-01 2012-10-01 false Marine terminal services agreements-exemption. 535.309... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.309 Marine terminal services agreements—exemption. (a) Marine terminal services agreement...

  7. 46 CFR 535.310 - Marine terminal facilities agreement-exemption.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 9 2013-10-01 2013-10-01 false Marine terminal facilities agreement-exemption. 535.310... COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT OF 1984 Exemptions § 535.310 Marine terminal facilities agreement—exemption. (a) Marine terminal facilities agreement...

  8. Low resistance electrode construction

    DOEpatents

    Redey, Laszlo; Karell, Eric J.

    2002-01-01

    An electrochemical cell having a cathode and an anode in contact with an electrolyte. Both electrodes or one of them has an electrically conducting non-metal receptacle defining a chamber with a first metal having a melting point in the range of from about room temperature to about 800.degree. C. inside said receptacle chamber. A second metal with a melting point greater than about 800.degree. C. is in contact with the first metal inside the receptacle chamber and extends outside of the receptacle chamber to form a terminal for the anode. The electrolyte may include the oxides, halides or mixtures thereof of one or more of Li, V, U, Al and the lanthanides. Metal may be produced at the cathode during operation of the cell and oxygen or chlorine at the anode.

  9. Study of VLCC tanker ship damage stability during off-shore operation

    NASA Astrophysics Data System (ADS)

    Hanzu-Pazara, R.; Arsenie, P.; Duse, A.; Varsami, C.

    2016-08-01

    Today, for the carriage of crude oil on sea are used larger tanker ships, especially from VLCC class. The operation of this type of ships requires in many cases special conditions, mainly related to water depth in the terminal area and enough maneuvering space for entrance and departure. Because, many ports from all over the world don't have capacity to operate this type of ships inside, in designed oil terminal, have chosen for development of outside terminals, off-shore oil terminals. In case of this type of terminals, the problems of water depth and manoeuvring space are fixed, but other kind of situations appears, regarding the safety in operation and environment factors impact on ship during mooring at oil transfer buoy. In the present paper we intend to show a study made using simulation techniques about VLCC class tanker ship in case of a damage condition resulted after a possible collision with another ship during loading operation at an off-shore terminal. From the beginning, we take in consideration that the ship intact stability, during all loading possible situations, has to be high enough, so that in case of some damage with flooding of different compartments due to hypothetical dimension water hole, the ship stability in the final stage of flooding to correspond to the requirements for damage stability and, also, to complementary requirements for damage ship stability.

  10. 75 FR 53264 - Restricted Area in Cape Fear River and Tributaries at Sunny Point Army Terminal, Brunswick County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers 33 CFR Part 334 Restricted Area in Cape Fear River and Tributaries at Sunny Point Army Terminal, Brunswick County, NC AGENCY: U.S. Army Corps of Engineers, DoD. ACTION: Proposed rule. SUMMARY: The U.S. Army requested that the U.S...

  11. 75 FR 53197 - Restricted Area in Cape Fear River and Tributaries at Sunny Point Army Terminal, Brunswick County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers 33 CFR Part 334 Restricted Area in Cape Fear River and Tributaries at Sunny Point Army Terminal, Brunswick County, NC AGENCY: U.S. Army Corps of Engineers, DoD. ACTION: Direct final rule. SUMMARY: The U.S. Army requested that the U.S...

  12. Enhanced networks operations using the X Window System

    NASA Technical Reports Server (NTRS)

    Linares, Irving

    1993-01-01

    We propose an X Window Graphical User Interface (GUI) which is tailored to the operations of NASA GSFC's Network Control Center (NCC), the NASA Ground Terminal (NGT), the White Sands Ground Terminal (WSGT), and the Second Tracking and Data Relay Satellite System (TDRSS) Ground Terminal (STGT). The proposed GUI can also be easily extended to other Ground Network (GN) Tracking Stations due to its standardized nature.

  13. Chaotic behaviors of operational amplifiers.

    PubMed

    Yim, Geo-Su; Ryu, Jung-Wan; Park, Young-Jai; Rim, Sunghwan; Lee, Soo-Young; Kye, Won-Ho; Kim, Chil-Min

    2004-04-01

    We investigate nonlinear dynamical behaviors of operational amplifiers. When the output terminal of an operational amplifier is connected to the inverting input terminal, the circuit exhibits period-doubling bifurcation, chaos, and periodic windows, depending on the voltages of the positive and the negative power supplies. We study these nonlinear dynamical characteristics of this electronic circuit experimentally.

  14. 78 FR 2483 - Ohio Terminal Railway Company-Operation Exemption-Hannibal Real Estate, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ... Railway Company--Operation Exemption--Hannibal Real Estate, LLC Ohio Terminal Railway Company (OTRC),\\1\\ a... near Hannibal, in Monroe County, Ohio (the Line), pursuant to an operating agreement with Hannibal Real Estate, LLC (Hannibal). \\1\\ OTRC is a wholly owned, corporate subsidiary of Carload Express, Inc. (CEI...

  15. 14 CFR 93.177 - Operations in the Special Air Traffic Rule Area.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Area. 93.177 Section 93.177 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... in the Vicinity of Luke AFB, AZ § 93.177 Operations in the Special Air Traffic Rule Area. (a) Unless... Luke Terminal Area designated in § 93.176 unless— (1) Before operating within the Luke Terminal area...

  16. Trajectory Specification for Automation of Terminal Air Traffic Control

    NASA Technical Reports Server (NTRS)

    Paielli, Russell A.

    2016-01-01

    "Trajectory specification" is the explicit bounding and control of aircraft tra- jectories such that the position at each point in time is constrained to a precisely defined volume of space. The bounding space is defined by cross-track, along-track, and vertical tolerances relative to a reference trajectory that specifies position as a function of time. The tolerances are dynamic and will be based on the aircraft nav- igation capabilities and the current traffic situation. A standard language will be developed to represent these specifications and to communicate them by datalink. Assuming conformance, trajectory specification can guarantee safe separation for an arbitrary period of time even in the event of an air traffic control (ATC) sys- tem or datalink failure, hence it can help to achieve the high level of safety and reliability needed for ATC automation. As a more proactive form of ATC, it can also maximize airspace capacity and reduce the reliance on tactical backup systems during normal operation. It applies to both enroute airspace and the terminal area around airports, but this paper focuses on arrival spacing in the terminal area and presents ATC algorithms and software for achieving a specified delay of runway arrival time.

  17. Trajectory Specification for Terminal Air Traffic: Pairwise Conflict Detection and Resolution

    NASA Technical Reports Server (NTRS)

    Paielli, Russ; Erzberger, Heinz

    2017-01-01

    Trajectory specification is the explicit bounding and control of aircraft trajectories such that the position at each point in time is constrained to a precisely defined volume of space. The bounding space is defined by cross-track, along-track, and vertical tolerances relative to a reference trajectory that specifies position as a function of time. The tolerances are dynamic and will be based on the aircraft navigation capabilities and the current traffic situation. A standard language will be developed to represent these specifications and to communicate them by datalink. Assuming conformance, trajectory specification can guarantee safe separation for an arbitrary period of time even in the event of an air traffic control (ATC) system or datalink failure, hence it can help to achieve the high level of safety and reliability needed for ATC automation. As a more proactive form of ATC, it can also maximize airspace capacity and reduce the reliance on tactical backup systems during normal operation. It applies to both enroute airspace and the terminal area around airports, but this paper focuses on the terminal area and presents algorithms and software for spacing arrivals and deconflicting both arrivals and departures.

  18. --RNA Polymerase II Transcription Attenuation at the Yeast DNA Repair Gene, DEF1, Involves Sen1-Dependent and Polyadenylation Site-Dependent Termination.

    PubMed

    Whalen, Courtney; Tuohy, Christine; Tallo, Thomas; Kaufman, James W; Moore, Claire; Kuehner, Jason N

    2018-04-23

    Termination of RNA Polymerase II (Pol II) activity serves a vital cellular function by separating ubiquitous transcription units and influencing RNA fate and function. In the yeast Saccharomyces cerevisiae , Pol II termination is carried out by cleavage and polyadenylation factor (CPF-CF) and Nrd1-Nab3-Sen1 (NNS) complexes, which operate primarily at mRNA and non-coding RNA genes, respectively. Premature Pol II termination (attenuation) contributes to gene regulation, but there is limited knowledge of its prevalence and biological significance. In particular, it is unclear how much crosstalk occurs between CPF-CF and NNS complexes and how Pol II attenuation is modulated during stress adaptation. In this study, we have identified an attenuator in the DEF1 DNA repair gene, which includes a portion of the 5'-untranslated region (UTR) and upstream open reading frame (ORF). Using a plasmid-based reporter gene system, we conducted a genetic screen of 14 termination mutants and their ability to confer Pol II read-through defects. The DEF1 attenuator behaved as a hybrid terminator, relying heavily on CPF-CF and Sen1 but without Nrd1 and Nab3 involvement. Our genetic selection identified 22 cis -acting point mutations that clustered into four regions, including a polyadenylation site efficiency element that genetically interacts with its cognate binding-protein Hrp1. Outside of the reporter gene context, a DEF1 attenuator mutant increased mRNA and protein expression, exacerbating the toxicity of a constitutively active Def1 protein. Overall, our data support a biologically significant role for transcription attenuation in regulating DEF1 expression, which can be modulated during the DNA damage response. Copyright © 2018, G3: Genes, Genomes, Genetics.

  19. Line of sight pointing technology for laser communication system between aircrafts

    NASA Astrophysics Data System (ADS)

    Zhao, Xin; Liu, Yunqing; Song, Yansong

    2017-12-01

    In space optical communications, it is important to obtain the most efficient performance of line of sight (LOS) pointing system. The errors of position (latitude, longitude, and altitude), attitude angles (pitch, yaw, and roll), and installation angle among a different coordinates system are usually ineluctable when assembling and running an aircraft optical communication terminal. These errors would lead to pointing errors and make it difficult for the LOS system to point to its terminal to establish a communication link. The LOS pointing technology of an aircraft optical communication system has been researched using a transformation matrix between the coordinate systems of two aircraft terminals. A method of LOS calibration has been proposed to reduce the pointing error. In a flight test, a successful 144-km link was established between two aircrafts. The position and attitude angles of the aircraft have been obtained to calculate the pointing angle in azimuth and elevation provided by using a double-antenna GPS/INS system. The size of the field of uncertainty (FOU) and the pointing accuracy are analyzed based on error theory, and it has been also measured using an observation camera installed next to the optical LOS. Our results show that the FOU of aircraft optical communications is 10 mrad without a filter, which is the foundation to acquisition strategy and scanning time.

  20. Transportable satellite voice terminals in Canada's north: Benefits from the users' perspectives

    NASA Astrophysics Data System (ADS)

    Sivertz, Christopher B.

    Infosat Telecommunications has developed a series of Ku-band transportable terminals for toll-quality telecommunications applications. These terminals are designed to provide reliable telephone, Group III facsimile, and computer data to users needing communications on short notice. The terminals are capable of providing full duplex service interconnecting into the public switched network or operating as an off-premise extension of an office private branch exchange. The terminals use a 1.8 m antenna and can be deployed from the back of a pick-up truck, single axle trailer or surface-mounted metal base. They operate reliable in extreme conditions and are very satellite efficient. This paper describes the features and performance of these terminals. Highlights of a number of remote installations are also discussed.

  1. 46 CFR 232.5 - Income Statement Accounts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...

  2. 46 CFR 232.5 - Income Statement Accounts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...

  3. 46 CFR 232.5 - Income Statement Accounts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...

  4. 46 CFR 232.5 - Income Statement Accounts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...

  5. 33 CFR 334.450 - Cape Fear River and tributaries at Sunny Point Army Terminal, Brunswick County, N.C.; restricted...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Cape Fear River and tributaries... AND RESTRICTED AREA REGULATIONS § 334.450 Cape Fear River and tributaries at Sunny Point Army Terminal, Brunswick County, N.C.; restricted area. (a) The area. That portion of Cape Fear River due west of the main...

  6. Using the Gilbert-Johnson-Keerthi Algorithm for Collision Detection in System Effectiveness Modeling

    DTIC Science & Technology

    2015-09-01

    product is vector whose i-th component is defined as (A×B)i = εi jkA jBk, (2) 2 where εi jk is the Levi - Civita symbol whose value is 1 if i jk is an...of GJK 9 3.1.1 Overview of GJK 9 3.1.2 Two Examples of GJK Operating 9 3.1.3 Termination Conditions 11 3.1.4 GJK Algorithm 13 3.2 Simplex Processing...band will snap around the outermost points, forming the convex hull. ...........5 Fig. 3 Two example triangles and their Minkowski Difference

  7. 77 FR 71178 - Termination of Department of Defense Federal Advisory Committees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-29

    ... DEPARTMENT OF DEFENSE Office of the Secretary Termination of Department of Defense Federal Advisory Committees AGENCY: Department of Defense. ACTION: Termination of Federal Advisory Committee..., the Department of Defense gives notice that it is terminating the Chief of Naval Operations Executive...

  8. 78 FR 5717 - Safety Zone; Military Ocean Terminal Concord Safety Zone, Suisun Bay, Military Ocean Terminal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ...-AA00 Safety Zone; Military Ocean Terminal Concord Safety Zone, Suisun Bay, Military Ocean Terminal... Guard is establishing a safety zone in the navigable waters of Suisun Bay near Military Ocean Terminal Concord, CA in support of military onload and offload operations. This safety zone is established to...

  9. Flight Path Synthesis and HUD Scaling for V/STOL Terminal Area Operations

    DOT National Transportation Integrated Search

    1995-04-01

    A two circle horizontal flightpath synthesis algorithm for Vertical/Short : Takeoff and Landing (V/STOL) terminal area operations is presented. This : algorithm provides a flight-path that is tangential to the aircraft's velocity : vector at the inst...

  10. Preliminary survey of potential STOL terminal area operational requirements

    DOT National Transportation Integrated Search

    1971-06-01

    A preliminary survey of potential operational requirements for STOL in the terminal area was made. The presentation of the survey is in three sections. The first section presents the motivation for the survey. The second section discusses the markets...

  11. CDC/1000: a Control Data Corporation remote batch terminal emulator for Hewlett-Packard minicomputers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, D.E.

    1981-02-01

    The Control Data Corporation Type 200 User Terminal utilizes a unique communications protocol to provide users with batch mode remote terminal access to Control Data computers. CDC/1000 is a software subsystem that implements this protocol on Hewlett-Packard minicomputers running the Real Time Executive III, IV, or IVB operating systems. This report provides brief descriptions of the various software modules comprising CDC/1000, and contains detailed instructions for integrating CDC/1000 into the Hewlett Packard operating system and for operating UTERM, the user interface program for CDC/1000. 6 figures.

  12. ALSEP termination report

    NASA Technical Reports Server (NTRS)

    Bates, J. R.; Lauderdale, W. W.; Kernaghan, H.

    1979-01-01

    The Apollo Lunar Surface Experiments Package (ALSEP) final report was prepared when support operations were terminated September 30, 1977, and NASA discontinued the receiving and processing of scientific data transmitted from equipment deployed on the lunar surface. The ALSEP experiments (Apollo 11 to Apollo 17) are described and pertinent operational history is given for each experiment. The ALSEP data processing and distribution are described together with an extensive discussion on archiving. Engineering closeout tests and results are given, and the status and configuration of the experiments at termination are documented. Significant science findings are summarized by selected investigators. Significant operational data and recommendations are also included.

  13. Using the NASA GRC Sectored-One-Dimensional Combustor Simulation

    NASA Technical Reports Server (NTRS)

    Paxson, Daniel E.; Mehta, Vishal R.

    2014-01-01

    The document is a user manual for the NASA GRC Sectored-One-Dimensional (S-1-D) Combustor Simulation. It consists of three sections. The first is a very brief outline of the mathematical and numerical background of the code along with a description of the non-dimensional variables on which it operates. The second section describes how to run the code and includes an explanation of the input file. The input file contains the parameters necessary to establish an operating point as well as the associated boundary conditions (i.e. how it is fed and terminated) of a geometrically configured combustor. It also describes the code output. The third section describes the configuration process and utilizes a specific example combustor to do so. Configuration consists of geometrically describing the combustor (section lengths, axial locations, and cross sectional areas) and locating the fuel injection point and flame region. Configuration requires modifying the source code and recompiling. As such, an executable utility is included with the code which will guide the requisite modifications and insure that they are done correctly.

  14. Discovery deep space optical communications (DSOC) transceiver

    NASA Astrophysics Data System (ADS)

    Roberts, W. Thomas

    2017-02-01

    NASA's 22 cm diameter Deep Space Optical Communications (DSOC) Transceiver is designed to provide a bidirectional optical link between a spacecraft in the inner solar system and an Earth-based optical ground station. This design, optimized for operation across a wide range of illumination conditions, is focused on minimizing blinding from stray light, and providing reliable, accurate attitude information to point its narrow communication beam accurately to the future location of the ground terminal. Though our transceiver will transmit in the 1550 nm waveband and receive in the 1064 nm waveband, the system design relies heavily on reflective optical elements, extending flexibility to be modified for use at different wavebands. The design makes use of common path propagation among transmit, receive and pointing verification optical channels to maintain precise alignment among its components, and to naturally correct for element misalignment resulting from launch or thermal element perturbations. This paper presents the results of trade studies showing the evolution of the design, unique operational characteristics of the design, elements that help to maintain minimal stray light contamination, and preliminary results from development and initial testing of a functional aluminum test model.

  15. Improved transmission of electrostatic accelerator in a wide range of terminal voltages by controlling the focal strength of entrance acceleration tube

    NASA Astrophysics Data System (ADS)

    Lobanov, Nikolai R.; Tunningley, Thomas; Linardakis, Peter

    2018-04-01

    Tandem electrostatic accelerators often require the flexibility to operate at a variety of terminal voltages to accommodate various user requirements. However, the ion beam transmission will only be optimal for a limited range of terminal voltages. This paper describes the operational performance of a novel focusing system that expands the range of terminal voltages for optimal transmission. This is accomplished by controlling the gradient of the entrance of the low-energy tube, providing an additional focusing element. In this specific case it is achieved by applying up to 150 kV to the fifth electrode of the first unit of the accelerator tube. Numerical simulations and beam transmission tests have been performed to confirm the effectiveness of the lens. An analytical expression has been derived describing its focal properties. These tests demonstrate that the entrance lens control eliminates the need to short out sections of the tube for operation at low terminal voltage.

  16. Research on information security system of waste terminal disposal process

    NASA Astrophysics Data System (ADS)

    Zhou, Chao; Wang, Ziying; Guo, Jing; Guo, Yajuan; Huang, Wei

    2017-05-01

    Informatization has penetrated the whole process of production and operation of electric power enterprises. It not only improves the level of lean management and quality service, but also faces severe security risks. The internal network terminal is the outermost layer and the most vulnerable node of the inner network boundary. It has the characteristics of wide distribution, long depth and large quantity. The user and operation and maintenance personnel technical level and security awareness is uneven, which led to the internal network terminal is the weakest link in information security. Through the implementation of security of management, technology and physics, we should establish an internal network terminal security protection system, so as to fully protect the internal network terminal information security.

  17. The PLATO IV Communications System.

    ERIC Educational Resources Information Center

    Sherwood, Bruce Arne; Stifle, Jack

    The PLATO IV computer-based educational system contains its own communications hardware and software for operating plasma-panel graphics terminals. Key echoing is performed by the central processing unit: every key pressed at a terminal passes through the entire system before anything appears on the terminal's screen. Each terminal is guaranteed…

  18. 47 CFR 25.134 - Licensing provisions of Very Small Aperture Terminal (VSAT) and C-band Small Aperture Terminal...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Terminal (VSAT) and C-band Small Aperture Terminal (CSAT) networks. 25.134 Section 25.134 Telecommunication...) and C-band Small Aperture Terminal (CSAT) networks. (a)(1) VSAT networks operating in the 12/14 GHz bands. All applications for digital VSAT networks granted on or before September 15, 2005, with a...

  19. 47 CFR 25.134 - Licensing provisions of Very Small Aperture Terminal (VSAT) and C-band Small Aperture Terminal...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Terminal (VSAT) and C-band Small Aperture Terminal (CSAT) networks. 25.134 Section 25.134 Telecommunication...) and C-band Small Aperture Terminal (CSAT) networks. (a)(1) VSAT networks operating in the 12/14 GHz bands. All applications for digital VSAT networks granted on or before September 15, 2005, with a...

  20. Guidance control of small UAV with energy and maneuverability limitations for a search and coverage mission

    NASA Astrophysics Data System (ADS)

    Gramajo, German G.

    This thesis presents an algorithm for a search and coverage mission that has increased autonomy in generating an ideal trajectory while explicitly considering the available energy in the optimization. Further, current algorithms used to generate trajectories depend on the operator providing a discrete set of turning rate requirements to obtain an optimal solution. This work proposes an additional modification to the algorithm so that it optimizes the trajectory for a range of turning rates instead of a discrete set of turning rates. This thesis conducts an evaluation of the algorithm with variation in turn duration, entry-heading angle, and entry point. Comparative studies of the algorithm with existing method indicates improved autonomy in choosing the optimization parameters while producing trajectories with better coverage area and closer final distance to the desired terminal point.

  1. Comparative study of adaptive controller using MIT rules and Lyapunov method for MPPT standalone PV systems

    NASA Astrophysics Data System (ADS)

    Tariba, N.; Bouknadel, A.; Haddou, A.; Ikken, N.; Omari, Hafsa El; Omari, Hamid El

    2017-01-01

    The Photovoltaic Generator have a nonlinear characteristic function relating the intensity at the voltage I = f (U) and depend on the variation of solar irradiation and temperature, In addition, its point of operation depends directly on the load that it supplies. To fix this drawback, and to extract the maximum power available to the terminal of the generator, an adaptation stage is introduced between the generator and the load to couple the two elements as perfectly as possible. The adaptation stage is associated with a command called MPPT MPPT (Maximum Power Point Tracker) whose is used to force the PVG to operate at the MPP (Maximum Power Point) under variation of climatic conditions and load variation. This paper presents a comparative study between the adaptive controller for PV Systems using MIT rules and Lyapunov method to regulate the PV voltage. The Incremental Conductance (IC) algorithm is used to extract the maximum power from the PVG by calculating the voltage Vref, and the adaptive controller is used to regulate and track quickly the PV voltage. The two methods of the adaptive controller will be compared to prove their performance by using the PSIM tools and experimental test, and the mathematical model of step-up with PVG model will be presented.

  2. Atmospheric Ascent Guidance for Rocket-Powered Launch Vehicles

    NASA Technical Reports Server (NTRS)

    Dukeman, Greg A.

    2002-01-01

    An advanced ascent guidance algorithm for rocket- powered launch vehicles is developed. This algorithm cyclically solves the calculus-of-variations two-point boundary-value problem starting at vertical rise completion through main engine cutoff. This is different from traditional ascent guidance algorithms which operate in a simple open-loop mode until high dynamic pressure (including the critical max-Q) portion of the trajectory is over, at which time guidance operates under the assumption of negligible aerodynamic acceleration (i.e., vacuum dynamics). The initial costate guess is corrected based on errors in the terminal state constraints and the transversality conditions. Judicious approximations are made to reduce the order and complexity of the state/costate system. Results comparing guided launch vehicle trajectories with POST open-loop trajectories are given verifying the basic formulation of the algorithm. Multiple shooting is shown to be a very effective numerical technique for this application. In particular, just one intermediate shooting point, in addition to the initial shooting point, is sufficient to significantly reduce sensitivity to the guessed initial costates. Simulation results from a high-fidelity trajectory simulation are given for the case of launch to sub-orbital cutoff conditions as well as launch to orbit conditions. An abort to downrange landing site formulation of the algorithm is presented.

  3. Communication target object recognition for D2D connection with feature size limit

    NASA Astrophysics Data System (ADS)

    Ok, Jiheon; Kim, Soochang; Kim, Young-hoon; Lee, Chulhee

    2015-03-01

    Recently, a new concept of device-to-device (D2D) communication, which is called "point-and-link communication" has attracted great attentions due to its intuitive and simple operation. This approach enables user to communicate with target devices without any pre-identification information such as SSIDs, MAC addresses by selecting the target image displayed on the user's own device. In this paper, we present an efficient object matching algorithm that can be applied to look(point)-and-link communications for mobile services. Due to the limited channel bandwidth and low computational power of mobile terminals, the matching algorithm should satisfy low-complexity, low-memory and realtime requirements. To meet these requirements, we propose fast and robust feature extraction by considering the descriptor size and processing time. The proposed algorithm utilizes a HSV color histogram, SIFT (Scale Invariant Feature Transform) features and object aspect ratios. To reduce the descriptor size under 300 bytes, a limited number of SIFT key points were chosen as feature points and histograms were binarized while maintaining required performance. Experimental results show the robustness and the efficiency of the proposed algorithm.

  4. Densely Cratered Terrain Near the Terminator

    NASA Image and Video Library

    2011-08-16

    NASA Dawn spacecraft shows densely cratered terrain near Vesta terminator on August 6, 2011. This image was taken through the framing camera clear filter aboard the spacecraft. North is pointing towards the two oclock position.

  5. Adjustable long duration high-intensity point light source

    NASA Astrophysics Data System (ADS)

    Krehl, P.; Hagelweide, J. B.

    1981-06-01

    A new long duration high-intensity point light source with adjustable light duration and a small light spot locally stable in time has been developed. The principle involved is a stationary high-temperature plasma flow inside a partly constrained capillary of a coaxial spark gap which is viewed end on through a terminating Plexiglas window. The point light spark gap is operated via a resistor by an artificial transmission line. Using two exchangeable inductance sets in the line, two ranges of photoduration 10-130 μs and 100-600 μs can be covered. For a light spot size of 1.5 mm diameter the corresponding peak light output amounts to 5×106 and 1.6×106 candelas, respectively. Within these ranges the duration is controlled by an ignitron crowbar to extinguish the plasma. The adjustable photoduration is very useful for the application of continuous writing rotating mirror cameras, thus preventing multiple exposures. The essentially uniform exposure within the visible spectral range makes the new light source suitable for color cinematography.

  6. 76 FR 75600 - Port Rail Link, Inc.-Acquisition and Operation Exemption-Rail Lines of Union Pacific Railroad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Charles Harbor and Terminal District Port Rail Link, Inc. (PRL), a noncarrier, has filed a verified notice... Charles; and (2) acquire by lease from The Lake Charles Harbor and Terminal District (the District), operator [[Page 75601

  7. LDPC-PPM Coding Scheme for Optical Communication

    NASA Technical Reports Server (NTRS)

    Barsoum, Maged; Moision, Bruce; Divsalar, Dariush; Fitz, Michael

    2009-01-01

    In a proposed coding-and-modulation/demodulation-and-decoding scheme for a free-space optical communication system, an error-correcting code of the low-density parity-check (LDPC) type would be concatenated with a modulation code that consists of a mapping of bits to pulse-position-modulation (PPM) symbols. Hence, the scheme is denoted LDPC-PPM. This scheme could be considered a competitor of a related prior scheme in which an outer convolutional error-correcting code is concatenated with an interleaving operation, a bit-accumulation operation, and a PPM inner code. Both the prior and present schemes can be characterized as serially concatenated pulse-position modulation (SCPPM) coding schemes. Figure 1 represents a free-space optical communication system based on either the present LDPC-PPM scheme or the prior SCPPM scheme. At the transmitting terminal, the original data (u) are processed by an encoder into blocks of bits (a), and the encoded data are mapped to PPM of an optical signal (c). For the purpose of design and analysis, the optical channel in which the PPM signal propagates is modeled as a Poisson point process. At the receiving terminal, the arriving optical signal (y) is demodulated to obtain an estimate (a^) of the coded data, which is then processed by a decoder to obtain an estimate (u^) of the original data.

  8. Preliminary evaluation of user terminals for an automated pilot briefing system

    DOT National Transportation Integrated Search

    1976-08-01

    This report describes a preliminary evaluation of various user terminal concepts for an automated aviation pilot weather briefing and flight plan filing system. Terminals embodying differing operational concepts were used by volunteer general aviatio...

  9. Minimum airflow reset of single-duct VAV terminal boxes

    NASA Astrophysics Data System (ADS)

    Cho, Young-Hum

    Single duct Variable Air Volume (VAV) systems are currently the most widely used type of HVAC system in the United States. When installing such a system, it is critical to determine the minimum airflow set point of the terminal box, as an optimally selected set point will improve the level of thermal comfort and indoor air quality (IAQ) while at the same time lower overall energy costs. In principle, this minimum rate should be calculated according to the minimum ventilation requirement based on ASHRAE standard 62.1 and maximum heating load of the zone. Several factors must be carefully considered when calculating this minimum rate. Terminal boxes with conventional control sequences may result in occupant discomfort and energy waste. If the minimum rate of airflow is set too high, the AHUs will consume excess fan power, and the terminal boxes may cause significant simultaneous room heating and cooling. At the same time, a rate that is too low will result in poor air circulation and indoor air quality in the air-conditioned space. Currently, many scholars are investigating how to change the algorithm of the advanced VAV terminal box controller without retrofitting. Some of these controllers have been found to effectively improve thermal comfort, indoor air quality, and energy efficiency. However, minimum airflow set points have not yet been identified, nor has controller performance been verified in confirmed studies. In this study, control algorithms were developed that automatically identify and reset terminal box minimum airflow set points, thereby improving indoor air quality and thermal comfort levels, and reducing the overall rate of energy consumption. A theoretical analysis of the optimal minimum airflow and discharge air temperature was performed to identify the potential energy benefits of resetting the terminal box minimum airflow set points. Applicable control algorithms for calculating the ideal values for the minimum airflow reset were developed and applied to actual systems for performance validation. The results of the theoretical analysis, numeric simulations, and experiments show that the optimal control algorithms can automatically identify the minimum rate of heating airflow under actual working conditions. Improved control helps to stabilize room air temperatures. The vertical difference in the room air temperature was lower than the comfort value. Measurements of room CO2 levels indicate that when the minimum airflow set point was reduced it did not adversely affect the indoor air quality. According to the measured energy results, optimal control algorithms give a lower rate of reheating energy consumption than conventional controls.

  10. Adjustable electronic load-alarm relay

    DOEpatents

    Mason, Charles H.; Sitton, Roy S.

    1976-01-01

    This invention is an improved electronic alarm relay for monitoring the current drawn by an AC motor or other electrical load. The circuit is designed to measure the load with high accuracy and to have excellent alarm repeatability. Chattering and arcing of the relay contacts are minimal. The operator can adjust the set point easily and can re-set both the high and the low alarm points by means of one simple adjustment. The relay includes means for generating a signal voltage proportional to the motor current. In a preferred form of the invention a first operational amplifier is provided to generate a first constant reference voltage which is higher than a preselected value of the signal voltage. A second operational amplifier is provided to generate a second constant reference voltage which is lower than the aforementioned preselected value of the signal voltage. A circuit comprising a first resistor serially connected to a second resistor is connected across the outputs of the first and second amplifiers, and the junction of the two resistors is connected to the inverting terminal of the second amplifier. Means are provided to compare the aforementioned signal voltage with both the first and second reference voltages and to actuate an alarm if the signal voltage is higher than the first reference voltage or lower than the second reference voltage.

  11. 46 CFR 525.3 - Availability of marine terminal operator schedules.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... that is made available to the public shall be available during normal business hours and in electronic... computer (PC) by: (1) Dial-up connection via public switched telephone networks (PSTN); or (2) The Internet... incoming calls, (ii) Smart terminal capability for VT-100 terminal or terminal emulation access, and (iii...

  12. 46 CFR 525.3 - Availability of marine terminal operator schedules.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... that is made available to the public shall be available during normal business hours and in electronic... computer (PC) by: (1) Dial-up connection via public switched telephone networks (PSTN); or (2) The Internet... incoming calls, (ii) Smart terminal capability for VT-100 terminal or terminal emulation access, and (iii...

  13. 46 CFR 525.3 - Availability of marine terminal operator schedules.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... that is made available to the public shall be available during normal business hours and in electronic... computer (PC) by: (1) Dial-up connection via public switched telephone networks (PSTN); or (2) The Internet... incoming calls, (ii) Smart terminal capability for VT-100 terminal or terminal emulation access, and (iii...

  14. A Preliminary Report on the PLATO V Terminal.

    ERIC Educational Resources Information Center

    Stifle, J. E.

    This report is a preliminary description of a prototype of a second generation version of the PLATO IV (Programmed Logic for Automated Teaching Operations) student terminal. Development of a new terminal has been pursued with two objectives: to generate a more economic version of the PLATO IV terminal, and to expand capacities and performance of…

  15. 76 FR 2414 - Termination of a Recreation and Public Purposes Classification and Opening Order in Comanche...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-13

    ... the operation of the public land laws generally. The classification termination and opening order will...] Termination of a Recreation and Public Purposes Classification and Opening Order in Comanche County, OK AGENCY: Bureau of Land Management, Interior. ACTION: Notice. SUMMARY: This order terminates a Bureau of Land...

  16. 77 FR 19417 - Affton Terminal Railroad Company-Operation Exemption1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... Railroad Company--Operation Exemption\\1\\--Affton Trucking Company Affton Terminal Railroad Company (ATRR... to an agreement with Affton Trucking Company (ATC),\\3\\ approximately 2.0 miles of railroad right-of... Railroad Association of St. Louis and BNSF Railway Company and inbound carloads for transloading into...

  17. 29 CFR 1917.155 - Air receivers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Air receivers. 1917.155 Section 1917.155 Labor Regulations...) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.155 Air receivers. (a) Application. This section applies to compressed air receivers and equipment used for operations such as cleaning...

  18. 29 CFR 1917.155 - Air receivers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Air receivers. 1917.155 Section 1917.155 Labor Regulations...) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.155 Air receivers. (a) Application. This section applies to compressed air receivers and equipment used for operations such as cleaning...

  19. 29 CFR 1917.155 - Air receivers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Air receivers. 1917.155 Section 1917.155 Labor Regulations...) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.155 Air receivers. (a) Application. This section applies to compressed air receivers and equipment used for operations such as cleaning...

  20. 29 CFR 1917.155 - Air receivers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Air receivers. 1917.155 Section 1917.155 Labor Regulations...) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.155 Air receivers. (a) Application. This section applies to compressed air receivers and equipment used for operations such as cleaning...

  1. 29 CFR 1917.155 - Air receivers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Air receivers. 1917.155 Section 1917.155 Labor Regulations...) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.155 Air receivers. (a) Application. This section applies to compressed air receivers and equipment used for operations such as cleaning...

  2. Single point mutations distributed in 10 soluble and membrane regions of the Nicotiana plumbaginifolia plasma membrane PMA2 H+-ATPase activate the enzyme and modify the structure of the C-terminal region.

    PubMed

    Morsomme, P; Dambly, S; Maudoux, O; Boutry, M

    1998-12-25

    The Nicotiana plumbaginifolia pma2 (plasma membrane H+-ATPase) gene is capable of functionally replacing the H+-ATPase genes of the yeast Saccharomyces cerevisiae, provided that the external pH is kept above 5.0. Single point mutations within the pma2 gene were previously identified that improved H+-ATPase activity and allowed yeast growth at pH 4.0. The aim of the present study was to identify most of the PMA2 positions, the mutation of which would lead to improved growth and to determine whether all these mutations result in similar enzymatic and structural modifications. We selected additional mutants in total 42 distinct point mutations localized in 30 codons. They were distributed in 10 soluble and membrane regions of the enzyme. Most mutant PMA2 H+-ATPases were characterized by a higher specific activity, lower inhibition by ADP, and lower stimulation by lysophosphatidylcholine than wild-type PMA2. The mutants thus seem to be constitutively activated. Partial tryptic digestion and immunodetection showed that the PMA2 mutants had a conformational change making the C-terminal region more accessible. These data therefore support the hypothesis that point mutations in various H+-ATPase parts displace the inhibitory C-terminal region, resulting in enzyme activation. The high density of mutations within the first half of the C-terminal region suggests that this part is involved in the interaction between the inhibitory C-terminal region and the rest of the enzyme.

  3. The effect of perioperative ketorolac on pain control in pregnancy termination.

    PubMed

    Roche, Natalie E; Li, Dongchen; James, Denise; Fechner, Adam; Tilak, Vasanti

    2012-03-01

    The study was conducted to evaluate the effect of perioperative ketorolac on pain associated with first-trimester aspiration abortion. A double-blind, randomized, placebo-controlled trial was performed involving pregnant women up to 14 weeks' gestation who desired pregnancy termination. Subjects were randomized to receive ketorolac 30 mg intravenously (n=31) or placebo (n=45) at the time of induction of anesthesia. Postoperative pain was assessed using a visual analog scale (VAS). The primary outcome was pain control as determined by VAS score. Secondary measures of patient use of supplemental postoperative pain medications and patient satisfaction were assessed. Subjects in the ketorolac group had lower postoperative pain scores on the VAS at all time points compared to the placebo group, but the difference was not statistically significant. The ketorolac group used less postoperative acetaminophen compared to the placebo group (6.5% versus 35.6%), respectively. Subjects in the placebo group and the ketorolac group had similar requirements for postoperative narcotics in the recovery room (22.2% versus 19.4%). Patient satisfaction with pain level was equivalent between the groups at all postoperative end points. There was no observed difference in perioperative blood loss observed between the two groups. Perioperative ketorolac has the same effect on postoperative pain as determined by VAS as placebo. The use of ketorolac at the 30-mg dose cannot be recommended for better pain control for patients undergoing first-trimester pregnancy termination by suction curettage. The only positive effect of the use of ketorolac compared to placebo was a reduction in the use of acetaminophen. Ketorolac use does not appear to change blood loss in the operating room or through postoperative day 1 compared to placebo. Copyright © 2012 Elsevier Inc. All rights reserved.

  4. Ultra-low voltage and ultra-low power consumption nonvolatile operation of a three-terminal atomic switch.

    PubMed

    Wang, Qi; Itoh, Yaomi; Tsuruoka, Tohru; Aono, Masakazu; Hasegawa, Tsuyoshi

    2015-10-21

    Nonvolatile three-terminal operation, with a very small range of bias sweeping (-80 to 250 mV), a high on/off ratio of up to six orders of magnitude, and a very small gate leakage current (<1 pA), is demonstrated using an Ag (gate)/Ta2 O5 (ionic transfer layer)/Pt (source), Pt (drain) three-terminal atomic switch structure. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  5. Simulation for assessment of bulk cargo berths number

    NASA Astrophysics Data System (ADS)

    Kuznetsov, A. L.; Kirichenko, A. V.; Slitsan, A. E.

    2017-10-01

    The world trade volumes of mineral resources have been growing constantly for decades, notwithstanding any economical crises. At the same time, the proximity of the bulk materials as products to the starting point of the integrated value added or logistic supply chain makes their unit price relatively low. This fact automatically causes a strong economic sensitivity of the supply chain to the level of operational expenses in every link. The core of the integrated logistic supply chain is its maritime segment, with the fleet and terminals (i.e. the cargo transportation system) serving as the base platform for it. In its turn, the terminal berths play a role of the interface between the fleet and the land-transportation sub-system. Current development of the maritime transportation technologies, ships and terminal specialization, vessel size growth, rationalization of route patterns, regionalization of trade etc., has made conventional calculation methods inadequate. The solution of the problem is in using object oriented simulation. At the same time, this approch usually assumes only ad hoc models. Thus, it does not provide the generality of its conventional analytical predecessors. The time and labor consumpting procedure of simulation results in a very narrow application domain of the model. This article describes a new simulation instrument, combining the generality of the analytical technoques with the efficiency of the object-oriented simulation. The approach implemented as a software module, which validity and adequacy are proved. The software was tested on several sea terminal design projects and confirmed its efficiency.

  6. A near-earth optical communications terminal with a corevolving planetary sun shield

    NASA Technical Reports Server (NTRS)

    Kerr, E. L.

    1989-01-01

    The umbra of a planet may serve as a sun shield for a space-based optical communications terminal or for a space-based astronomical observatory. An orbit that keeps the terminal or observatory within the umbra is desirable. There is a corevolution point behind every planet. A small body stabilized at the planet corevolution point will revolve about the sun at the same angular velocity as the planet, always keeping the planet between itself and the sun. This corevolution point is within the umbra of Mars but beyond the end of the umbra for Mercury, Venus, and earth. The Mars corevolution point is an ideal location for an astronomical observatory. There, Mars obstruct less than 0.00024 percent of the sky at any time, and it shades the observatory completely from the sun. At the earth corevolution point, between 51 and 84 percent of the solar disk area is blocked, as is up to 92 percent of the sunlight. This provides a reduction from 3 dB to 11 dB in sunlight that could interfere with optical communications if scattered directly into the detectors. The variations is caused by revolution of the earth about the earth-moon barycenter.

  7. A near-earth optical communications terminal with a corevolving planetary sun shield

    NASA Technical Reports Server (NTRS)

    Kerr, E. L.

    1987-01-01

    The umbra of a planet may serve as a sun shield for a space based optical communications terminal or for a space based astronomical observatory. An orbit that keeps the terminal or observatory within the umbra is desirable. There is a corevolution point behind every planet. A small body stabilized at the planet corevolution point will revolve about the sun at the same angular velocity as the planet, always keeping the planet between itself and the sun. This corevolution point is within the umbra of Mars but beyond the end of the umbra for Mercury, Venus, and earth. The Mars corevolution point is an ideal location for an astronomical observatory. There Mars obstruct less than 0.00024 percent of the sky at any time, and it shades the observatory completely from the sun. At the earth corevolution point, between 51 and 84 percent of the solar disk area is blocked, as is up to 92 percent of the sunlight. This provides a reduction from 3 dB to 11 dB in sunlight that could interfere with optical communications if scattered directly into the detectors. The variations is caused by revolution of the earth about the earth-moon barycenter.

  8. 77 FR 24990 - Marine Terminals and Longshoring Standards; Extension of the Office of Management and Budget's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    .... Estimated Total Burden Hours: 47,398. Estimated Cost (Operation and Maintenance): $0. IV. Public..., reporting burden (time and costs) is minimal, collection instruments are clearly understood, and OSHA's... safety and health hazards associated with marine terminals and longshoring operations. OSHA uses the...

  9. Remote Monitor Alarm System

    NASA Technical Reports Server (NTRS)

    Stute, Robert A. (Inventor); Galloway, F. Houston (Inventor); Medelius, Pedro J. (Inventor); Swindle, Robert W. (Inventor); Bierman, Tracy A. (Inventor)

    1996-01-01

    A remote monitor alarm system monitors discrete alarm and analog power supply voltage conditions at remotely located communications terminal equipment. A central monitoring unit (CMU) is connected via serial data links to each of a plurality of remote terminal units (RTUS) that monitor the alarm and power supply conditions of the remote terminal equipment. Each RTU can monitor and store condition information of both discrete alarm points and analog power supply voltage points in its associated communications terminal equipment. The stored alarm information is periodically transmitted to the CMU in response to sequential polling of the RTUS. The number of monitored alarm inputs and permissible voltage ranges for the analog inputs can be remotely configured at the CMU and downloaded into programmable memory at each RTU. The CMU includes a video display, a hard disk memory, a line printer and an audio alarm for communicating and storing the alarm information received from each RTU.

  10. Fail-safe transcription termination: Because one is never enough.

    PubMed

    Lemay, Jean-François; Bachand, François

    2015-01-01

    Termination of RNA polymerase II (RNAPII) transcription is a fundamental step of gene expression that involves the release of the nascent transcript and dissociation of RNAPII from the DNA template. As transcription termination is intimately linked to RNA 3' end processing, termination pathways have a key decisive influence on the fate of the transcribed RNA. Quite remarkably, when reaching the 3' end of genes, a substantial fraction of RNAPII fail to terminate transcription, requiring the contribution of alternative or "fail-safe" mechanisms of termination to release the polymerase. This point of view covers redundant mechanisms of transcription termination and how they relate to conventional termination models. In particular, we expand on recent findings that propose a reverse torpedo model of termination, in which the 3'5' exonucleolytic activity of the RNA exosome targets transcription events associated with paused and backtracked RNAPII.

  11. Utility of de-escalatory confidence-building measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nation, J.

    1989-06-01

    This paper evaluates the utility of specific confidence-building de-escalatory measures and pays special attention to the evaluation of measures which place restrictions on or establish procedures for strategic forces. Some measures appear more promising than others. Potentially useful confidence-building measures largely satisfy defined criteria and include the phased return of strategic nuclear forces to peacetime bases and operations, the termination of interference with communications and NTMs (National Technical Means) and the termination of civil defense preparations. Less-promising CBMs include the standing down of supplemental early warning systems, the establishment of SSBN keep-out zones, and decreases in bomber alert rates. Establishmentmore » of SSBN keep-out zones and reduction in bomber rates are difficult to verify, while the standing-down of early warning systems provides little benefit at potentially large costs. Particular confidence-building measures (CBMs) may be most useful in building superpower confidence at specific points in the crisis termination phase. For example, a decrease in strategic bomber alert rates may provide some decrease in perception of the likelihood of war, but its potential costs, particularly in increasing bomber vulnerability, may limit its utility and implementation to the final crisis stages when the risks of re-escalation and surprise attack are lower.« less

  12. Knowledge-Based Runway Assignment for Arrival Aircraft in the Terminal Area

    DOT National Transportation Integrated Search

    1997-01-01

    A knowledge-based system for scheduling arrival traffic in the terminal area, : referred to as the Final Approach Spacing Tool (FAST), has been implemented and : operationally tested at the Dallas/Fort Worth Terminal Radar Approach Control : (TRACON)...

  13. Conceptual Design of a Tiltrotor Transport Flight Deck

    NASA Technical Reports Server (NTRS)

    Decker, William A.; Dugan, Daniel C.; Simmons, Rickey C.; Tucker, George E.; Aiken, Edwin W. (Technical Monitor)

    1995-01-01

    A tiltrotor transport has considerable potential as a regional transport, increasing the air transportation system capacity by off-loading conventional runways. Such an aircraft will have a flight deck suited to its air transportation task and adapted to unique urban vertiport operating requirements. Such operations are likely to involve steep, slow instrument approaches for vertical and extremely short rolling take-offs and landings. While much of a tiltrotor transport's operations will be in common with commercial fixed-wing operations, terminal area operations will impose alternative flight deck design solutions. Control systems, displays and guidance, and control inceptors must be tailored to both routine and emergency vertical flight operations. This paper will survey recent experience with flight deck design elements suitable to a tiltrotor transport and will propose a conceptual cockpit design for such an aircraft. A series of piloted simulations using the NASA Ames Vertical Motion Simulator have investigated cockpit design elements and operating requirements for tiltrotor transports operating into urban vertiports. These experiments have identified the need for a flight director or equivalent display guidance for steep final approaches. A flight path vector display format has proven successful for guiding tiltrotor transport terminal area operations. Experience with a Head-Up Display points to the need for a bottom-mounted display device to maximize its utility on steep final approach paths. Configuration control (flap setting and nacelle angle) requires appropriate augmentation and tailoring for civil transport operations, flown to an airline transport pilot instrument flight rules (ATP-IFR) standard. The simulation experiments also identified one thrust control lever geometry as inappropriate to the task and found at least acceptable results with the vertical thrust control lever of the XV-15. In addition to the thrust controller, the attitude control of a tiltrotor transport may be effected through an inceptor other than the current center sticks in the XV-15 and V-22. Simulation and flight investigations of side-stick control inceptors for rotorcraft, augmented by a 1985 flight test of a side-stick controller in the XV-15 suggest the potential of such a device in a transport cockpit.

  14. Intermittent Drug Dosing Intervals Guided by the Operational Multiple Dosing Half Lives for Predictable Plasma Accumulation and Fluctuation

    PubMed Central

    Grover, Anita; Benet, Leslie Z.

    2013-01-01

    Intermittent drug dosing intervals are usually initially guided by the terminal pharmacokinetic half life and are dependent on drug formulation. For chronic multiple dosing and for extended release dosage forms, the terminal half life often does not predict the plasma drug accumulation or fluctuation observed. We define and advance applications for the operational multiple dosing half lives for drug accumulation and fluctuation after multiple oral dosing at steady-state. Using Monte Carlo simulation, our results predict a way to maximize the operational multiple dosing half lives relative to the terminal half life by using a first-order absorption rate constant close to the terminal elimination rate constant in the design of extended release dosage forms. In this way, drugs that may be eliminated early in the development pipeline due to a relatively short half life can be formulated to be dosed at intervals three times the terminal half life, maximizing compliance, while maintaining tight plasma concentration accumulation and fluctuation ranges. We also present situations in which the operational multiple dosing half lives will be especially relevant in the determination of dosing intervals, including for drugs that follow a direct PKPD model and have a narrow therapeutic index, as the rate of concentration decrease after chronic multiple dosing (that is not the terminal half life) can be determined via simulation. These principles are illustrated with case studies on valproic acid, diazepam, and anti-hypertensives. PMID:21499748

  15. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: Terminal Operations HITL 1: Primary Results

    NASA Technical Reports Server (NTRS)

    Rorie, Conrad; Fern, Lisa; Monk, Kevin; Roberts, Zach; Brandt, Summer

    2017-01-01

    This presentation covers the primary results of the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project Terminal Operations Foundational Human-in-the-Loop (HITL) simulation. The study tasked 16 pilots (half with manned piloting experience, and the other half with unmanned piloting experience) with maintaining "well clear" from other traffic while performing three different types of approaches into the Santa Rosa airport. A detect and avoid (DAA) system was provided to pilots to assist their ability to manage separation. The DAA system used in this test conformed to the criteria defined by RTCA Special Committee 228 (SC-228) in their Phase 1 Minimum Operational Performance Standards (MOPS) for UAS intending to operate in the NAS. The Phase 1 system was not designed to account for terminal operations, focusing instead on en route operations. To account for this, three different alerting and guidance configurations were presently tested in order to determine their effect on pilots operating the system in the terminal area. Results indicated that pilots with the alerting and guidance condition that provided the least amount of assistance (fewer alert levels and guidance types) experienced slightly increased pilot response times and rates of losses of separation. Additional data is presented on the effects of approach type and descriptive data on pilot maneuver preferences and ATC interoperability.

  16. Aerospace Ground Equipment for model 4080 sequence programmer. A standard computer terminal is adapted to provide convenient operator to device interface

    NASA Technical Reports Server (NTRS)

    Nissley, L. E.

    1979-01-01

    The Aerospace Ground Equipment (AGE) provides an interface between a human operator and a complete spaceborne sequence timing device with a memory storage program. The AGE provides a means for composing, editing, syntax checking, and storing timing device programs. The AGE is implemented with a standard Hewlett-Packard 2649A terminal system and a minimum of special hardware. The terminal's dual tape interface is used to store timing device programs and to read in special AGE operating system software. To compose a new program for the timing device the keyboard is used to fill in a form displayed on the screen.

  17. Development and evaluation of a Kalman-filter algorithm for terminal area navigation using sensors of moderate accuracy

    NASA Technical Reports Server (NTRS)

    Kanning, G.; Cicolani, L. S.; Schmidt, S. F.

    1983-01-01

    Translational state estimation in terminal area operations, using a set of commonly available position, air data, and acceleration sensors, is described. Kalman filtering is applied to obtain maximum estimation accuracy from the sensors but feasibility in real-time computations requires a variety of approximations and devices aimed at minimizing the required computation time with only negligible loss of accuracy. Accuracy behavior throughout the terminal area, its relation to sensor accuracy, its effect on trajectory tracking errors and control activity in an automatic flight control system, and its adequacy in terms of existing criteria for various terminal area operations are examined. The principal investigative tool is a simulation of the system.

  18. Flight experiments to improve terminal area operations

    NASA Technical Reports Server (NTRS)

    Salmirs, S.; Morello, S. A.

    1978-01-01

    A brief description is given of the objectives and activities of the terminal configured vehicle (TCV) program and of some of the airborne facilities. A short analysis of some particular problems in CTOL operations in the terminal area is also presented to show how the program's technical objectives are related to the defined problems. The test aircraft was flown both manually and automatically with manual monitoring over paths including 130 deg intercepts and 2.0 km and 0.8 km finals. Some statistical data are presented from these and other flight profiles designed to address specific terminal area problems. An overview is presented of research studies receiving emphasis in the next biennium and their application to the terminal area. A description of work undertaken to study the addition of adjacent traffic information to present map displays is also given.

  19. Flight experiments to improve terminal area operations

    NASA Technical Reports Server (NTRS)

    Salmirs, S.; Morello, S. A.

    1978-01-01

    A brief description is given of the objectives and activities of the terminal configured vehicle (TCV) program and of some of the airborne facilities. A short analysis of some particular problems of CTOL operations in the terminal area is also presented to show how the program's technical objectives are related to the defined problems. The test aircraft was flown both manually and automatically with manual monitoring over paths including 130 deg intercepts and 2.0 km (1.1. n. mi.) and 0.8 km (0.44 n. mi.) finals. Some statistical data are presented from these and other flight profiles designed to address specific terminal in the next biennium and their application to the terminal area. A description of work being undertaken to study the addition of adjacent traffic information to present map displays is also given.

  20. System requirements and benefits of a terminal information system for the Kansas City railroads

    DOT National Transportation Integrated Search

    1976-08-31

    The Kansas City Terminal Railway Company proposed that the Federal Railroad Administration assist in funding the implementation of a Terminal Information and Message Exchange system (TIME), designed to enhance the operations of the twelve railroads i...

  1. Digital integrated control of a Mach 2.5 mixed-compression supersonic inlet and an augmented mixed-flow turbofan engine

    NASA Technical Reports Server (NTRS)

    Batterton, P. G.; Arpasi, D. J.; Baumbick, R. J.

    1974-01-01

    A digitally implemented integrated inlet-engine control system was designed and tested on a mixed-compression, axisymmetric, Mach 2.5, supersonic inlet with 45 percent internal supersonic area contraction and a TF30-P-3 augmented turbofan engine. The control matched engine airflow to available inlet airflow. By monitoring inlet terminal shock position and over-board bypass door command, the control adjusted engine speed so that in steady state, the shock would be at the desired location and the overboard bypass doors would be closed. During engine-induced transients, such as augmentor light-off and cutoff, the inlet operating point was momentarily changed to a more supercritical point to minimize unstarts. The digital control also provided automatic inlet restart. A variable inlet throat bleed control, based on throat Mach number, provided additional inlet stability margin.

  2. 14 CFR 323.3 - Who shall file notices.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... terminated or suspended whenever it is operated less than 5 days per week, with three or more intermediate... than 5 days per week, with three or more intermediate stops, or in one direction only between the two... shall be considered to be terminated or suspended whenever it is operated less than 5 days per week...

  3. 14 CFR 323.3 - Who shall file notices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... terminated or suspended whenever it is operated less than 5 days per week, with three or more intermediate... than 5 days per week, with three or more intermediate stops, or in one direction only between the two... shall be considered to be terminated or suspended whenever it is operated less than 5 days per week...

  4. Operation mode switchable charge-trap memory based on few-layer MoS2

    NASA Astrophysics Data System (ADS)

    Hou, Xiang; Yan, Xiao; Liu, Chunsen; Ding, Shijin; Zhang, David Wei; Zhou, Peng

    2018-03-01

    Ultrathin layered two-dimensional (2D) semiconductors like MoS2 and WSe2 have received a lot of attention because of their excellent electrical properties and potential applications in electronic devices. We demonstrate a charge-trap memory with two different tunable operation modes based on a few-layer MoS2 channel and an Al2O3/HfO2/Al2O3 charge storage stack. Our device shows excellent memory properties under the traditional three-terminal operation mode. More importantly, unlike conventional charge-trap devices, this device can also realize the memory performance with just two terminals (drain and source) because of the unique atomic crystal electrical characteristics. Under the two-terminal operation mode, the erase/program current ratio can reach up to 104 with a stable retention property. Our study indicates that the conventional charge-trap memory cell can also realize the memory performance without the gate terminal based on novel two dimensional materials, which is meaningful for low power consumption and high integration density applications.

  5. Intelligent building system for airport

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ancevic, M.

    1997-11-01

    The Munich airport uses a state-of-the-art intelligent building management system to control systems such as HVAC, runway lights, baggage handling, etc. Planning the new Munich II international airport provided a unique opportunity to use the latest state-of-the-art technical systems, while integrating their control through a single intelligent building management system. Opened in 1992, the airport is Germany`s second-largest airport after Frankfurt. The airport is staffed by 16,000 employees and can handle 17 million passengers a year. The sprawling site encompasses more than 120 buildings. The airport`s distributed control system is specifically designed to optimize the complex`s unique range of functions,more » while providing a high degree of comfort, convenience and safety for airport visitors. With the capacity to control 200,000 points, this system controls more than 112,000 points and integrates 13 major subsystems from nine different vendors. It provides convenient, accessible control of everything including the complex`s power plant, HVAC Control, the terminal`s people-moving functions, interior lighting controls, runway lights, baggage forwarding systems, elevators, and boarding bridges. The airport was named 1993 intelligent building of the year by the Intelligent Buildings Institute Foundation. Its building management system is a striking example of the degree to which a building complex`s functions can be integrated for greater operational control and efficiency.« less

  6. The link evaluation terminal for the advanced communications technology satellite experiments program

    NASA Technical Reports Server (NTRS)

    May, Brian D.

    1992-01-01

    The experimental NASA satellite, Advanced Communications Technology Satellite (ACTS), introduces new technology for high throughput 30 to 20 GHz satellite services. Contained in a single communication payload is both a regenerative TDMA system and multiple 800 MHz 'bent pipe' channels routed to spot beams by a switch matrix. While only one mode of operation is typical during any experiment, both modes can operate simultaneously with reduced capability due to sharing of the transponder. NASA-Lewis instituted a ground terminal development program in anticipation of the satellite launch to verify the performance of the switch matrix mode of operations. Specific functions are built into the ground terminal to evaluate rain fade compensation with uplink power control and to monitor satellite transponder performance with bit error rate measurements. These functions were the genesis of the ground terminal's name, Link Evaluation Terminal, often referred to as LET. Connectors are included in LET that allow independent experimenters to run unique modulation or network experiments through ACTS using only the RF transmit and receive portions of LET. Test data indicate that LET will be able to verify important parts of ACTS technology and provide independent experimenters with a useful ground terminal. Lab measurements of major subsystems integrated into LET are presented. Bit error rate is measured with LET in an internal loopback mode.

  7. Using Hybrid Simulation/Analytical Queueing Networks to Capacitate USAF Air Mobility Command Passenger Terminals

    DTIC Science & Technology

    2012-03-01

    Simulation Simulation is a flexible tool for modeling airport operations , which has made the method a staple for airport systems analysts. Animation...be derived to define the character- istics of the airport terminal and describe the nature of the systems [sic] operation ”, which makes discrete...This system decomposition method, however, disregards the effects of network structure on performance measures. Real-life processes do not operate

  8. The Analysis of Information Exchange Capability for Battlefield Networks Using M&S Techniques of the NetSPIN

    DTIC Science & Technology

    2013-06-01

    of the ATCIS in the NetSPIN Name Main functions Terminal Functions as the terminal that generates traffics MFE (Multi-Function accessing...generates traffics : MFE Function to transform messages of SST into TCP liP packets (Multi-Function accessing Equipment) Termmal PPP Functions of the...center Operation battalion DMT Computer shelter DLP Operation center MFE DMTTerminal Command post of a corps Brigade communication Operation

  9. Have We Really Been Analyzing Terminating Simulations Incorrectly All These Years?

    DTIC Science & Technology

    2013-12-01

    TERMINATING SIMULATIONS INCORRECTLY ALL THESE YEARS? Paul J. Sánchez Operations Research Naval Postgraduate School 1411 Cunningham Road Monterey, CA...measure. If that observation directly represents an end state such as the number of failed components after a week’s operation , or the number of patients...processed in 24 hours of emergency room operations , there’s no problem—the set of values obtained by replication represent a random sample from the

  10. Housing Operation Management System (HOMES). Volume 7. Assignments and Terminations User Manual.

    DTIC Science & Technology

    1984-04-01

    PAINTED. SANDED, AND COMPONENT REPLACED. ADDITIONAL ENGINEERING FUNCTIONS WILL BE AVAILABLE IN THE HEAR FUTURE WHEN THE HOMES ENGINEERING SUBSYSTEM IS...OPERATOR OFF- LINE PROCESS rTERMINATION HOMES 001 ENTER PFI B ATE PROVIDED- BY OCCUPANT SCHDUL HOMES 200 ENTER PFIO PRETERM . 1 INSPECTION PREPARE AOV...OPERATOR OFF-LINE PROCESS S INSPECTOR OBTAINS HAND RECEIPT I 8CHECK LIST INSPECTOR 1 OBTAINS LISTOF OUTSTANDING M&R REQMTS . INSPECTOR CONDUCTS PRETERM

  11. Fail-safe transcription termination: Because one is never enough

    PubMed Central

    Lemay, Jean-François; Bachand, François

    2015-01-01

    Termination of RNA polymerase II (RNAPII) transcription is a fundamental step of gene expression that involves the release of the nascent transcript and dissociation of RNAPII from the DNA template. As transcription termination is intimately linked to RNA 3′ end processing, termination pathways have a key decisive influence on the fate of the transcribed RNA. Quite remarkably, when reaching the 3′ end of genes, a substantial fraction of RNAPII fail to terminate transcription, requiring the contribution of alternative or “fail-safe” mechanisms of termination to release the polymerase. This point of view covers redundant mechanisms of transcription termination and how they relate to conventional termination models. In particular, we expand on recent findings that propose a reverse torpedo model of termination, in which the 3′5′ exonucleolytic activity of the RNA exosome targets transcription events associated with paused and backtracked RNAPII. PMID:26273910

  12. A linear quadratic Gaussian with loop transfer recovery proximity operations autopilot for spacecraft. M.S. Thesis - MIT

    NASA Technical Reports Server (NTRS)

    Chen, George T.

    1987-01-01

    An automatic control scheme for spacecraft proximity operations is presented. The controller is capable of holding the vehicle at a prescribed location relative to a target, or maneuvering it to a different relative position using straight line-of-sight translations. The autopilot uses a feedforward loop to initiate and terminate maneuvers, and for operations at nonequilibrium set-points. A multivariate feedback loop facilitates precise position and velocity control in the presence of sensor noise. The feedback loop is formulated using the Linear Quadratic Gaussian (LQG) with Loop Transfer Recovery (LTR) design procedure. Linear models of spacecraft dynamics, adapted from Clohessey-Wiltshire Equations, are augmented and loop shaping techniques are applied to design a target feedback loop. The loop transfer recovery procedure is used to recover the frequency domain properties of the target feedback loop. The resulting compensator is integrated into an autopilot which is tested in a high fidelity Space Shuttle Simulator. The autopilot performance is evaluated for a variety of proximity operations tasks envisioned for future Shuttle flights.

  13. 47 CFR 90.463 - Transmitter control points.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... any dispatch point being supervised. (e) Where the system is interconnected with public communication..., (2) To terminate any transmission(s) or communication(s) between points in the public communications....463 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES...

  14. 47 CFR 90.463 - Transmitter control points.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... any dispatch point being supervised. (e) Where the system is interconnected with public communication..., (2) To terminate any transmission(s) or communication(s) between points in the public communications....463 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES...

  15. 47 CFR 90.463 - Transmitter control points.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... any dispatch point being supervised. (e) Where the system is interconnected with public communication..., (2) To terminate any transmission(s) or communication(s) between points in the public communications....463 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES...

  16. 47 CFR 90.463 - Transmitter control points.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... any dispatch point being supervised. (e) Where the system is interconnected with public communication..., (2) To terminate any transmission(s) or communication(s) between points in the public communications....463 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES...

  17. 43 CFR 29.13 - Termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Termination. Upon termination of operations of the Pipeline, the full disposition of all claims, and the... shall request that Congress provide for final disposition of the Fund. If Congress at any time establishes a comprehensive oil pollution liability fund which supersedes or repeals the Fund, the Fund assets...

  18. A human operator simulator model of the NASA Terminal Configured Vehicle (TCV)

    NASA Technical Reports Server (NTRS)

    Glenn, F. A., III; Doane, S. M.

    1981-01-01

    A generic operator model called HOS was used to simulate the behavior and performance of a pilot flying a transport airplane during instrument approach and landing operations in order to demonstrate the applicability of the model to problems associated with interfacing a crew with a flight system. The model which was installed and operated on NASA Langley's central computing system is described. Preliminary results of its application to an investigation of an innovative display system under development in Langley's terminal configured vehicle program are considered.

  19. Terminal-area STOL operating systems experiments program

    NASA Technical Reports Server (NTRS)

    Smith, D. W.; Watson, D.; Christensen, J. V.

    1973-01-01

    Information which will aid in the choice by the U.S. Government and industry of system concepts, design criteria, operating procedures for STOL aircraft and STOL ports, STOL landing guidance systems, air traffic control systems, and airborne avionics and flight control systems. Ames has developed a terminal-area STOL operating systems experiments program which is a part of the joint DOT/NASA effort is discussed. The Ames operating systems experiments program, its objectives, the program approach, the program schedule, typical experiments, the research facilities to be used, and the program status are described.

  20. 14 CFR 93.321 - Transfer and termination of allocations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... commercial air tours outside the Dragon and Zuni Point corridors may not be transferred into the Dragon and Zuni Point corridors. Allocations authorizing commercial air tours within the Dragon and Zuni Point corridors may be transferred outside of the Dragon and Zuni Point corridors. (iii) A certificate holder must...

  1. 14 CFR 93.321 - Transfer and termination of allocations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... commercial air tours outside the Dragon and Zuni Point corridors may not be transferred into the Dragon and Zuni Point corridors. Allocations authorizing commercial air tours within the Dragon and Zuni Point corridors may be transferred outside of the Dragon and Zuni Point corridors. (iii) A certificate holder must...

  2. 14 CFR 93.321 - Transfer and termination of allocations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... commercial air tours outside the Dragon and Zuni Point corridors may not be transferred into the Dragon and Zuni Point corridors. Allocations authorizing commercial air tours within the Dragon and Zuni Point corridors may be transferred outside of the Dragon and Zuni Point corridors. (iii) A certificate holder must...

  3. 14 CFR 93.321 - Transfer and termination of allocations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... commercial air tours outside the Dragon and Zuni Point corridors may not be transferred into the Dragon and Zuni Point corridors. Allocations authorizing commercial air tours within the Dragon and Zuni Point corridors may be transferred outside of the Dragon and Zuni Point corridors. (iii) A certificate holder must...

  4. 46 CFR 525.1 - Purpose and scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., warehouse or other terminal facilities in connection with a common carrier, or in connection with a common...; common carriers who perform port terminal services; and warehousemen who operate port terminal facilities... storage spaces, cold storage plants, cranes, grain elevators and/or bulk cargo loading and/or unloading...

  5. Instantons in Self-Organizing Logic Gates

    NASA Astrophysics Data System (ADS)

    Bearden, Sean R. B.; Manukian, Haik; Traversa, Fabio L.; Di Ventra, Massimiliano

    2018-03-01

    Self-organizing logic is a recently suggested framework that allows the solution of Boolean truth tables "in reverse"; i.e., it is able to satisfy the logical proposition of gates regardless to which terminal(s) the truth value is assigned ("terminal-agnostic logic"). It can be realized if time nonlocality (memory) is present. A practical realization of self-organizing logic gates (SOLGs) can be done by combining circuit elements with and without memory. By employing one such realization, we show, numerically, that SOLGs exploit elementary instantons to reach equilibrium points. Instantons are classical trajectories of the nonlinear equations of motion describing SOLGs and connect topologically distinct critical points in the phase space. By linear analysis at those points, we show that these instantons connect the initial critical point of the dynamics, with at least one unstable direction, directly to the final fixed point. We also show that the memory content of these gates affects only the relaxation time to reach the logically consistent solution. Finally, we demonstrate, by solving the corresponding stochastic differential equations, that, since instantons connect critical points, noise and perturbations may change the instanton trajectory in the phase space but not the initial and final critical points. Therefore, even for extremely large noise levels, the gates self-organize to the correct solution. Our work provides a physical understanding of, and can serve as an inspiration for, models of bidirectional logic gates that are emerging as important tools in physics-inspired, unconventional computing.

  6. Operation plan for the data 100/LARS terminal system

    NASA Technical Reports Server (NTRS)

    Bowen, A. J., Jr.

    1980-01-01

    The Data 100/LARS terminal system provides an interface for processing on the IBM 3031 computer system at Purdue University's Laboratory for Applications of Remote Sensing. The environment in which the system is operated and supported is discussed. The general support responsibilities, procedural mechanisms, and training established for the benefit of the system users are defined.

  7. 78 FR 28272 - Self-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-14

    ... systems operated by NASDAQ, including the Nasdaq Market Center, the FINRA/NASDAQ Trade Reporting Facility... using any facility or system which the Exchange operates or controls. All similarly situated members are...) for use of VTE terminals. A VTE terminal is a basic front- end user interface used by NASDAQ members...

  8. 7 CFR 1425.7 - Suspension and termination of approval.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ASSOCIATIONS § 1425.7 Suspension and termination of approval. (a) CCC may suspend a CMA from obtaining loans and LDP's when CCC determines the CMA has not: (1) Operated according to the CMA's application for... deficiencies of the CMA's operation as noted by CCC; or (4) Violated any of its agreements with CCC. (b) A...

  9. 7 CFR 1425.7 - Suspension and termination of approval.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ASSOCIATIONS § 1425.7 Suspension and termination of approval. (a) CCC may suspend a CMA from obtaining loans and LDP's when CCC determines the CMA has not: (1) Operated according to the CMA's application for... deficiencies of the CMA's operation as noted by CCC; or (4) Violated any of its agreements with CCC. (b) A...

  10. 7 CFR 1425.7 - Suspension and termination of approval.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ASSOCIATIONS § 1425.7 Suspension and termination of approval. (a) CCC may suspend a CMA from obtaining loans and LDP's when CCC determines the CMA has not: (1) Operated according to the CMA's application for... deficiencies of the CMA's operation as noted by CCC; or (4) Violated any of its agreements with CCC. (b) A...

  11. 7 CFR 1425.7 - Suspension and termination of approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ASSOCIATIONS § 1425.7 Suspension and termination of approval. (a) CCC may suspend a CMA from obtaining loans and LDP's when CCC determines the CMA has not: (1) Operated according to the CMA's application for... deficiencies of the CMA's operation as noted by CCC; or (4) Violated any of its agreements with CCC. (b) A...

  12. 7 CFR 1425.7 - Suspension and termination of approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ASSOCIATIONS § 1425.7 Suspension and termination of approval. (a) CCC may suspend a CMA from obtaining loans and LDP's when CCC determines the CMA has not: (1) Operated according to the CMA's application for... deficiencies of the CMA's operation as noted by CCC; or (4) Violated any of its agreements with CCC. (b) A...

  13. Artificial Intelligence Techniques for the Berth Allocation and Container Stacking Problems in Container Terminals

    NASA Astrophysics Data System (ADS)

    Salido, Miguel A.; Rodriguez-Molins, Mario; Barber, Federico

    The Container Stacking Problem and the Berth Allocation Problem are two important problems in maritime container terminal's management which are clearly related. Terminal operators normally demand all containers to be loaded into an incoming vessel should be ready and easily accessible in the terminal before vessel's arrival. Similarly, customers (i.e., vessel owners) expect prompt berthing of their vessels upon arrival. In this paper, we present an artificial intelligence based-integrated system to relate these problems. Firstly, we develop a metaheuristic algorithm for berth allocation which generates an optimized order of vessel to be served according to existing berth constraints. Secondly, we develop a domain-oriented heuristic planner for calculating the number of reshuffles needed to allocate containers in the appropriate place for a given berth ordering of vessels. By combining these optimized solutions, terminal operators can be assisted to decide the most appropriated solution in each particular case.

  14. Energy efficiency in wireless communication systems

    DOEpatents

    Caffrey, Michael Paul; Palmer, Joseph McRae

    2012-12-11

    Wireless communication systems and methods utilize one or more remote terminals, one or more base terminals, and a communication channel between the remote terminal(s) and base terminal(s). The remote terminal applies a direct sequence spreading code to a data signal at a spreading factor to provide a direct sequence spread spectrum (DSSS) signal. The DSSS signal is transmitted over the communication channel to the base terminal which can be configured to despread the received DSSS signal by a spreading factor matching the spreading factor utilized to spread the data signal. The remote terminal and base terminal can dynamically vary the matching spreading factors to adjust the data rate based on an estimation of operating quality over time between the remote terminal and base terminal such that the amount of data being transmitted is substantially maximized while providing a specified quality of service.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lian, Suoyuan; School of Chemical Engineering and Materials, Dalian Polytechnic University, Dalian 116034; Tsang, Chi Him A.

    Graphical abstract: H-SiNWs can catalyze hydroxylation of benzene and degradation of methyl red under visible light irradiation. Highlights: Black-Right-Pointing-Pointer Hydrogen-terminated silicon nanowires were active photocatalyst in the hydroxylation of benzene under light. Black-Right-Pointing-Pointer Hydrogen-terminated silicon nanowires were also effective in the decomposition of methyl red dye. Black-Right-Pointing-Pointer The Si/SiO{sub x} core-shell structure is the main reason of the obtained high selectivity during the hydroxylation. -- Abstract: Hydrogen-terminated silicon nanowires (H-SiNWs) were used as heterogeneous photocatalysts for the hydroxylation of benzene and for the decomposition of methyl red under visible light irradiation. The above reactions were monitored by GC-MS and UV-Vismore » spectrophotometry, respectively, which shows 100% selectivity for the transformation of benzene to phenol. A complete decomposition of a 2 Multiplication-Sign 10{sup -4} M methyl red solution was achieved within 30 min. The high selectivity for the hydroxylation of benzene and the photodecomposition demonstrate the catalytic activity of ultrafine H-SiNWs during nanocatalysis.« less

  16. Continuity and Change in the Eighties and Beyond. Proceedings of the Natinal Security Affairs Conference (6th) Held 23-25 July 1979, National Defense University.

    DTIC Science & Technology

    1979-11-01

    oilhead to final terminals in Europe. North America. and Japan The oil wofis themselves provide a cluster of obvious targets, as do the collecting ...systems which bring the oil from the fields to the local terminal facilities The collecting system is made up of pumps and pipes The local terminal...but the most important targets are the oil terminals, since it is at these points that the oil from various fields is collected into one place for

  17. Exploitation of Ubiquitous Wi-Fi Devices as Building Blocks for Improvised Motion Detection Systems.

    PubMed

    Soldovieri, Francesco; Gennarelli, Gianluca

    2016-02-27

    This article deals with a feasibility study on the detection of human movements in indoor scenarios based on radio signal strength variations. The sensing principle exploits the fact that the human body interacts with wireless signals, introducing variations of the radiowave fields due to shadowing and multipath phenomena. As a result, human motion can be inferred from fluctuations of radiowave power collected by a receiving terminal. In this paper, we investigate the potentialities of widely available wireless communication devices in order to develop an improvised motion detection system (IMDS). Experimental tests are performed in an indoor environment by using a smartphone as a Wi-Fi access point and a laptop with dedicated software as a receiver. Simple detection strategies tailored for real-time operation are implemented to process the received signal strength measurements. The achieved results confirm the potentialities of the simple system here proposed to reliably detect human motion in operational conditions.

  18. Communications Satellite Systems Conference, 9th, San Diego, CA, March 7-11, 1982, Collection of Technical Papers

    NASA Astrophysics Data System (ADS)

    The Shuttle-to-Geostationary Orbital Transfer by mid-level thrust is considered along with multibeam antenna concepts for global communications, the antenna pointing systems for large communication satellites, the connection phase of multidestination protocols for broadcast satellites, and an experiment in high-speed international packet switching. Attention is given to a dynamic switch matrix for the TDMA satellite switching system, the characterization of 16 bit microprocessors for space use, in-orbit operation and test of Intelsat V satellites, the first operational communications system via satellite in Europe, the Arab satellite communications systems, second generation business satellite systems for Europe, and a high performance Ku-band satellite for the 1980's. Other topics investigated are related to Ku-band terminal design tradeoffs, progress in the definition of the Italian satellite for domestic telecommunications, future global satellite systems for Intelsat, and satellite refuelling in orbit.

  19. Kerman Photovoltaic Power Plant R&D data collection computer system operations and maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosen, P.B.

    1994-06-01

    The Supervisory Control and Data Acquisition (SCADA) system at the Kerman PV Plant monitors 52 analog, 44 status, 13 control, and 4 accumulator data points in real-time. A Remote Terminal Unit (RTU) polls 7 peripheral data acquisition units that are distributed throughout the plant once every second, and stores all analog, status, and accumulator points that have changed since the last scan. The R&D Computer, which is connected to the SCADA RTU via a RS-232 serial link, polls the RTU once every 5-7 seconds and records any values that have changed since the last scan. A SCADA software package calledmore » RealFlex runs on the R&D computer and stores all updated data values taken from the RTU, along with a time-stamp for each, in a historical real-time database. From this database, averages of all analog data points and snapshots of all status points are generated every 10 minutes and appended to a daily file. These files are downloaded via modem by PVUSA/Davis staff every day, and the data is placed into the PVUSA database.« less

  20. Demonstration of free-space optical communication for long-range data links between balloons on Project Loon

    NASA Astrophysics Data System (ADS)

    Moision, Bruce; Erkmen, Baris; Keyes, Edward; Belt, Todd; Bowen, Oliver; Brinkley, Devin; Csonka, Paul; Eglington, Michael; Kazmierski, Andrei; Kim, Nam-hyong; Moody, John; Tu, Thanh; Vermeer, William

    2017-02-01

    Internet connectivity is limited and in some cases non-existent for a significant part of the world's population. Project Loon aims to address this with a network of high-altitude balloons traveling in the stratosphere, at an altitude of approximately 20 km. The balloons navigate by using the stratified wind layers at different altitudes, adjusting the balloon's altitude to catch winds in a desired direction. Data transfer is achieved by 1) uplinking a signal from an Internet-connected ground station to a balloon terminal, 2) crosslinking the signal through the balloon network to reach the geographic area of the users, and 3) downlinking the signal directly to the end-users' phones or other LTE-enabled devices. We describe Loon's progress on utilizing free-space optical communications (FSOC) for the inter-balloon crosslinks. FSOC, offering high data rates and long communication ranges, is well-suited for communication between high-altitude platforms. A stratospheric link is sufficiently high to be above weather events (clouds, fog, rain, etc.), and the impact of atmospheric turbulence is significantly weaker than at ground level. In addition, being in the stratosphere as opposed to space helps avoid the typical challenges faced by space-based systems, namely operation in a vacuum environment with significant radiation. Finally, the angular pointing disturbances introduced by a floating balloon-based platform are notably less than any propelled platform, which simplifies the disturbance rejection requirements on the FSOC system. We summarize results from Project Loon's early-phase experimental inter-balloon links at 20 km altitude, demonstrating full duplex 130 Mbps throughput at distances in excess of 100 km over the course of several-day flights. The terminals utilize a monostatic design, with dual wavelengths for communication and a dedicated wide-angle beacon for pointing, acquisition, and tracking. We summarize the constraints on the terminal design, and the key design trades that led to our initial system. We illustrate measured performance during flight tests: received signal power variations with range, pointing system performance, and data throughput.

  1. LIBRARY INFORMATION PROCESSING USING AN ON-LINE, REAL-TIME COMPUTER SYSTEM.

    ERIC Educational Resources Information Center

    HOLZBAUR, FREDERICK W.; FARRIS, EUGENE H.

    DIRECT MAN-MACHINE COMMUNICATION IS NOW POSSIBLE THROUGH ON-LINE, REAL-TIME TYPEWRITER TERMINALS DIRECTLY CONNECTED TO COMPUTERS. THESE TERMINAL SYSTEMS PERMIT THE OPERATOR, WHETHER ORDER CLERK, CATALOGER, REFERENCE LIBRARIAN OR TYPIST, TO INTERACT WITH THE COMPUTER IN MANIPULATING DATA STORED WITHIN IT. THE IBM ADMINISTRATIVE TERMINAL SYSTEM…

  2. Personal-Computer Video-Terminal Emulator

    NASA Technical Reports Server (NTRS)

    Buckley, R. H.; Koromilas, A.; Smith, R. M.; Lee, G. E.; Giering, E. W.

    1985-01-01

    OWL-1200 video terminal emulator has been written for IBM Personal Computer. The OWL-1200 is a simple user terminal with some intelligent capabilities. These capabilities include screen formatting and block transmission of data. Emulator is written in PASCAL and Assembler for the IBM Personal Computer operating under DOS 1.1.

  3. 27 CFR 11.35 - Termination of business.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2012-04-01 2012-04-01 false Termination of business. 11.35 Section 11.35 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU... business. Products on hand at the time a trade buyer terminates operations may be returned for cash or...

  4. Experiments applications guide: Advanced Communications Technology Satellite (ACTS)

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This applications guide first surveys the capabilities of the Advanced Communication Technology Satellite (ACTS) system (both the flight and ground segments). This overview is followed by a description of the baseband processor (BBP) and microwave switch matrix (MSM) operating modes. Terminals operating with the baseband processor are referred to as low burst rate (LBR); and those operating with the microwave switch matrix, as high burst rate (HBR). Three very small-aperture terminals (VSATs), LBR-1, LBR-2, and HBR, are described for various ACTS operating modes. Also described is the NASA Lewis link evaluation terminal. A section on ACTS experiment opportunities introduces a wide spectrum of network control, telecommunications, system, and scientific experiments. The performance of the VSATs is discussed in detail. This guide is intended as a catalyst to encourage participation by the telecommunications, business, and science communities in a broad spectrum of experiments.

  5. Optimizing Integrated Terminal Airspace Operations Under Uncertainty

    NASA Technical Reports Server (NTRS)

    Bosson, Christabelle; Xue, Min; Zelinski, Shannon

    2014-01-01

    In the terminal airspace, integrated departures and arrivals have the potential to increase operations efficiency. Recent research has developed geneticalgorithm- based schedulers for integrated arrival and departure operations under uncertainty. This paper presents an alternate method using a machine jobshop scheduling formulation to model the integrated airspace operations. A multistage stochastic programming approach is chosen to formulate the problem and candidate solutions are obtained by solving sample average approximation problems with finite sample size. Because approximate solutions are computed, the proposed algorithm incorporates the computation of statistical bounds to estimate the optimality of the candidate solutions. A proof-ofconcept study is conducted on a baseline implementation of a simple problem considering a fleet mix of 14 aircraft evolving in a model of the Los Angeles terminal airspace. A more thorough statistical analysis is also performed to evaluate the impact of the number of scenarios considered in the sampled problem. To handle extensive sampling computations, a multithreading technique is introduced.

  6. A NOVEL PROCESS TO USE SALT CAVERNS TO RECEIVE SHIP BORNE LNG

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael M. McCall; William M. Bishop; Marcus Krekel

    2005-05-31

    This cooperative research project validates use of man made salt caverns to receive and store the cargoes of LNG ships in lieu of large liquid LNG tanks. Salt caverns will not tolerate direct injection of LNG because it is a cryogenic liquid, too cold for contact with salt. This research confirmed the technical processes and the economic benefits of pressuring the LNG up to dense phase, warming it to salt compatible temperatures and then directly injecting the dense phase gas into salt caverns for storage. The use of salt caverns to store natural gas sourced from LNG imports, particularly whenmore » located offshore, provides a highly secure, large scale and lower cost import facility as an alternative to tank based LNG import terminals. This design can unload a ship in the same time as unloading at a tank based terminal. The Strategic Petroleum Reserve uses man made salt caverns to securely store large quantities of crude oil. Similarly, this project describes a novel application of salt cavern gas storage technologies used for the first time in conjunction with LNG receiving. The energy industry uses man made salt caverns to store an array of gases and liquids but has never used man made salt caverns directly in the importation of LNG. This project has adapted and expanded the field of salt cavern storage technology and combined it with novel equipment and processes to accommodate LNG importation. The salt cavern based LNG receiving terminal described in the project can be located onshore or offshore, but the focus of the design and cost estimates has been on an offshore location, away from congested channels and ports. The salt cavern based terminal can provide large volumes of gas storage, high deliverability from storage, and is simplified in operation compared to tank based LNG terminals. Phase I of this project included mathematical modeling that proved a salt cavern based receiving terminal could be built at lower capital cost, and would have significantly higher delivery capacity, shorter construction time, and be much more secure than a conventional liquid tank based terminal. Operating costs of a salt cavern terminal are lower than tank based terminals because ''boil off'' is eliminated and maintenance costs of caverns are lower than LNG tanks. Phase II included the development of offshore mooring designs, wave tank tests, high pressure LNG pump field tests, heat exchanger field tests, and development of a model offshore LNG facility and cavern design. Engineers designed a model facility, prepared equipment lists, and confirmed capital and operating costs. In addition, vendors quoted fabrication and installation costs, confirming that an offshore salt cavern based LNG terminal would have lower capital and operating costs than a similarly sized offshore tank based terminal. Salt cavern storage is infinitely more secure than surface storage tanks, far less susceptible to accidents or purposeful damage, and much more acceptable to the community. More than thirty industry participants provided cost sharing, technical expertise, and guidance in the conduct and evaluation of the field tests, facility design and operating and cost estimates. Their close participation has accelerated the industry's acceptance of the conclusions of this research. The industry participants also developed and submitted several alternative designs for offshore mooring and for high pressure LNG heat exchangers in addition to those that were field tested in this project. HNG Storage, a developer, owner, and operator of natural gas storage facilities, and a participant in the DOE research has announced they will lead the development of the first offshore salt cavern based LNG import facility. Which will be called the Freedom LNG Terminal. It will be located offshore Louisiana, and is expected to be jointly developed with other members of the research group yet to be named. An offshore port license application is scheduled to be filed by fourth quarter 2005 and the terminal could be operational by 2009. This terminal allows the large volume importation of LNG without disrupting coastal port operations by being offshore, out of sight of land.« less

  7. Proximity Operations for the Robotic Boulder Capture Option for the Asteroid Redirect Mission

    NASA Technical Reports Server (NTRS)

    Reeves, David M.; Naasz, Bo J.; Wright, Cinnamon A.; Pini, Alex J.

    2014-01-01

    In September of 2013, the Asteroid Robotic Redirect Mission (ARRM) Option B team was formed to expand on NASA's previous work on the robotic boulder capture option. While the original Option A concept focuses on capturing an entire smaller Near-Earth Asteroid (NEA) using an inflatable bag capture mechanism, this design seeks to land on a larger NEA and retrieve a boulder off of its surface. The Option B team has developed a detailed and feasible mission concept that preserves many aspects of Option A's vehicle design while employing a fundamentally different technique for returning a significant quantity of asteroidal material to the Earth-Moon system. As part of this effort, a point of departure proximity operations concept was developed complete with a detailed timeline, as well as DeltaV and propellant allocations. Special attention was paid to the development of the approach strategy, terminal descent to the surface, controlled ascent with the captured boulder, and control during the Enhanced Gravity Tractor planetary defense demonstration. The concept of retrieving a boulder from the surface of an asteroid and demonstrating the Enhanced Gravity Tractor planetary defense technique is found to be feasible and within the proposed capabilities of the Asteroid Redirect Vehicle (ARV). While this point of departure concept initially focuses on a mission to Itokawa, the proximity operations design is also shown to be extensible to wide range of asteroids.

  8. Designing gondola using satcom services and solar cell energy

    NASA Astrophysics Data System (ADS)

    Cau, M.; Dezen, P.

    Introduction of compact, and lightweight terminals for mobile satellite communication, opens up many opportunities to design new telecommunication systems for balloons. Architecture of this gondola, named Narcisse, is built around a control process unit able to support interface with all Inmarsat services, and Iridium or Thuraya satellite network as well. A first technological gondola was launched from Brazil in February 2001, under a Infra Red Mongolfiere (hot air balloon). This gondola used an Inmarsat terminal C which can support in two ways , store and forward messages at a data rate of 600 bits per second. During the 3 turns around the earth, the system worked well, and demonstrated its ability to handle change over from one geostationary spacecraft to the next, when balloon changes ocean region. Moreover this system provides high telemetry rate (Mbits) or telecommand capability, and greatly increase the performances of the scientific payloads . On the other hand, such types of gondola can be useful to operate long duration flight (days) with large stratospheric balloons, currently limited to range capability of UHF ground station . When line of sight of view is lost, between ground station and gondola, the switch would be made from UHF to the Inmarsat or iridium system to complete the mission. In this case, the TM/TC system has no range or altitude limitation, and the gondola descent trajectory can be followed until the ground improving the localization of landing which will be helpful for recovery operation. So, using a real time duplex mini M Inmarsat terminal, the Narcisse gondola has been operationally involved early 2002 in Archeops project. Launched from Kiruna, Narcisse provided a full duplex 2400bits per second link, all along the flight across Russia. Narcisse has been again involved in march 2003 in Mipas project, using Iridium as a cold redundancy to secure Inmarsat mini M not working at extreme polar regions (latitude more than 80°). During this flight an Inmarsat mini M was also used to provide a scientific telemetry and telecomand channel. A lighter version (15 Kg) of this gondola is currently involved in the Hibiscus project (launch of Infrared montgolfieres from Brazil ). This gondola fitted with the new terminal "Ec track" which taking advantage of better RF budget link offered by Inmarsat spacecraft third generation, requires 50% : launch of hundred pressurized balloons from south pole. The target being to decrease the gondola weight to less than 10 Kg. Expecting a life duration of three months, the energy to heat and power the electronic will be only provided from solar cells and Li Ion secondary battery. Plans for the future : Until now all the terminals we have used with Narcisse have a data rate limited to 2400 bit/s. We are now considering to transmit the data from scientific stratospheric balloons gondolas , by using a high speed terminal (64kbit/s) linked to a mechanically pointed antenna under a pressurized radome.

  9. Delaunay based algorithm for finding polygonal voids in planar point sets

    NASA Astrophysics Data System (ADS)

    Alonso, R.; Ojeda, J.; Hitschfeld, N.; Hervías, C.; Campusano, L. E.

    2018-01-01

    This paper presents a new algorithm to find under-dense regions called voids inside a 2D point set. The algorithm starts from terminal-edges (local longest-edges) in a Delaunay triangulation and builds the largest possible low density terminal-edge regions around them. A terminal-edge region can represent either an entire void or part of a void (subvoid). Using artificial data sets, the case of voids that are detected as several adjacent subvoids is analyzed and four subvoid joining criteria are proposed and evaluated. Since this work is inspired on searches of a more robust, effective and efficient algorithm to find 3D cosmological voids the evaluation of the joining criteria considers this context. However, the design of the algorithm permits its adaption to the requirements of any similar application.

  10. Low noise tuned amplifier

    NASA Technical Reports Server (NTRS)

    Kleinberg, L. L. (Inventor)

    1984-01-01

    A bandpass amplifier employing a field effect transistor amplifier first stage is described with a resistive load either a.c. or directly coupled to the non-inverting input of an operational amplifier second stage which is loaded in a Wien Bridge configuration. The bandpass amplifier may be operated with a signal injected into the gate terminal of the field effect transistor and the signal output taken from the output terminal of the operational amplifier. The operational amplifier stage appears as an inductive reactance, capacitive reactance and negative resistance at the non-inverting input of the operational amplifier, all of which appear in parallel with the resistive load of the field effect transistor.

  11. The Use of a Computer-Controlled Random Access Slide Projector for Rapid Information Display.

    ERIC Educational Resources Information Center

    Muller, Mark T.

    A 35mm random access slide projector operated in conjunction with a computer terminal was adapted to meet the need for a more rapid and complex graphic display mechanism than is currently available with teletypewriter terminals. The model projector can be operated manually to provide for a maintenance checkout of the electromechanical system.…

  12. 78 FR 26056 - Waterway Suitability Assessment for Expansion of Liquefied Gas Terminals; Nederland, TX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Marketing and Terminals has submitted a Letter of Intent and a Waterway Suitability Assessment to the Coast... and Purpose: Under 33 CFR 127.007(a), an owner or operator planning new construction to expand or.... Under 33 CFR 127.007(e), an owner or operator planning such an expansion must also file or update a...

  13. Computer program development and user's manual for program PARACH. [to investigate parachute spent solid rocket booster during terminal descent

    NASA Technical Reports Server (NTRS)

    Murphree, H. I.

    1979-01-01

    A user's manual is provided for program PARACH, a FORTRAN digital computer program operational on the Univac 1108. A description of the program and operating instructions for it are included. Program PARACH is used to study the interaction dynamics of a parachute and its payload during terminal descent. Operating instructions, required input data, program options and limitations, and output data are described. Subroutines used in this program are also listed and explained.

  14. Terminal-area STOL operating systems experiments program

    NASA Technical Reports Server (NTRS)

    Smith, D. W.; Watson, D.; Christensen, J. V.

    1972-01-01

    A system study to determine the application of short takeoff aircraft for a high speed, short haul air transportation service was conducted. The study focused on developing information which will aid in choosing system concepts, design criteria, operating procedures, landing guidance systems, air traffic control systems, and airborne avionics and flight control systems. A terminal area STOL operating system experiments program was developed. The objectives, program approach, program schedule, typical experiments, research facilities to be used, and program status are discussed.

  15. Assessing materials handling and storage capacities in port terminals

    NASA Astrophysics Data System (ADS)

    Dinu, O.; Roşca, E.; Popa, M.; Roşca, M. A.; Rusca, A.

    2017-08-01

    Terminals constitute the factual interface between different modes and, as a result, buffer stocks are unavoidable whenever transport flows with different discontinuities meet. This is the reason why assessing materials handling and storage capacities is an important issue in the course of attempting to increase operative planning of logistic processes in terminals. Proposed paper starts with a brief review of the compatibilities between different sorts of materials and corresponding transport modes and after, a literature overview of the studies related to ports terminals and their specialization is made. As a methodology, discrete event simulation stands as a feasible technique for assessing handling and storage capacities at the terminal, taking into consideration the multi-flows interaction and the non-uniform arrivals of vessels and inland vehicles. In this context, a simulation model, that integrates the activities of an inland water terminal and describes the essential interactions between the subsystems which influence the terminal capacity, is developed. Different scenarios are simulated for diverse sorts of materials, leading to bottlenecks identification, performance indicators such as average storage occupancy rate, average dwell or transit times estimations, and their evolution is analysed in order to improve the transfer operations in the logistic process

  16. Models and methods for assessing the value of HVDC and MVDC technologies in modern power grids

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Makarov, Yuri V.; Elizondo, Marcelo A.; O'Brien, James G.

    This report reflects the results of U.S. Department of Energy’s (DOE) Grid Modernization project 0074 “Models and methods for assessing the value of HVDC [high-voltage direct current] and MTDC [multi-terminal direct current] technologies in modern power grids.” The work was done by the Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) in cooperation with Mid-Continent Independent System Operator (MISO) and Siemens. The main motivation of this study was to show the benefit of using direct current (DC) systems larger than those in existence today as they overlap with the alternating current (AC) systems. Proper use of theirmore » flexibility in terms of active/reactive power control and fast response can provide much-needed services to the grid at the same time as moving large blocks of energy to take advantage of cost diversity. Ultimately, the project’s success will enable decision-makers and investors to make well-informed decisions regarding this use of DC systems. This project showed the technical feasibility of HVDC macrogrid for frequency control and congestion relief in addition to bulk power transfers. Industry-established models for commonly used technologies were employed, along with high-fidelity models for recently developed HVDC converter technologies; like the modular multilevel converters (MMCs), a voltage source converters (VSC). Models for General Electric Positive Sequence Load Flow (GE PSLF) and Siemens Power System Simulator (PSS/E), widely used analysis programs, were for the first time adapted to include at the same time both Western Electricity Coordinating Council (WECC) and Eastern Interconnection (EI), the two largest North American interconnections. The high-fidelity models and their control were developed in detail for MMC system and extended to HVDC systems in point-to-point and in three-node multi-terminal configurations. Using a continental-level mixed AC-DC grid model, and using a HVDC macrogrid power flow and transient stability model, the results showed that the HVDC macrogrid relieved congestion and mitigated loop flows in AC networks, and provided up to 24% improvement in frequency responses. These are realistic studies, based on the 2025 heavy summer and EI multi-regional modeling working group (MMWG) 2026 summer peak cases. This work developed high-fidelity models and simulation algorithms to understand the dynamics of MMC. The developed models and simulation algorithms are up to 25 times faster than the existing algorithms. Models and control algorithms for high-fidelity models were designed and tested for point-to-point and multi-terminal configurations. The multi-terminal configuration was tested connecting simplified models of EI, WI, and Electric Reliability Council of Texas (ERCOT). The developed models showed up to 45% improvement in frequency response with the connection of all the three asynchronous interconnections in the United States using fast and advanced DC technologies like the multi-terminal MMC-DC system. Future work will look into developing high-fidelity models of other advanced DC technologies, combining high-fidelity models with the continental-level model, incorporating additional services. More scenarios involving large-scale HVDC and MTDC will be evaluated.« less

  17. Trajectory Specification for Terminal Air Traffic: Pairwise Conflict Detection and Resolution

    NASA Technical Reports Server (NTRS)

    Paielli, Russell A.; Erzberger, Heinz

    2017-01-01

    Trajectory Specification is the explicit bounding and control of aircraft trajectories such that the position at any point in time is constrained to a precisely defined volume of space. The bounding space is defined by cross-track, along-track, and vertical tolerances relative to a reference trajectory that specifies position as a function of time. The tolerances are dynamic and will be based on the aircraft navigation capabilities and the current traffic situation. Assuming conformance, Trajectory Specification can guarantee safe separation for an arbitrary period of time even in the event of an air traffic control (ATC) system or datalink failure; hence it can help to achieve the high level of safety and reliability needed for ATC automation. It can also reduce the reliance on tactical backup systems during normal operation. This paper applies it to the terminal area around a major airport and presents algorithms and software for detecting and resolving conflicts. A representative set of pairwise conflicts was generated, and a fast-time simulation was run on them. All conflicts were successfully resolved in real time, demonstrating the computational feasibility of the concept.

  18. Design of MPPT Controller Monitoring Software Based on QT Framework

    NASA Astrophysics Data System (ADS)

    Meng, X. Z.; Lu, P. G.

    2017-10-01

    The MPPT controller was a hardware device for tracking the maximum power point of solar photovoltaic array. Multiple controllers could be working as networking mode by specific communicating protocol. In this article, based on C++ GUI programming with Qt frame, we designed one sort of desktop application for monitoring and analyzing operational parameter of MPPT controller. The type of communicating protocol for building network was Modbus protocol which using Remote Terminal Unit mode and The desktop application of host computer was connected with all the controllers in the network through RS485 communication or ZigBee wireless communication. Using this application, user could monitor the parameter of controller wherever they were by internet.

  19. Digital controllers for VTOL aircraft

    NASA Technical Reports Server (NTRS)

    Stengel, R. F.; Broussard, J. R.; Berry, P. W.

    1976-01-01

    Using linear-optimal estimation and control techniques, digital-adaptive control laws have been designed for a tandem-rotor helicopter which is equipped for fully automatic flight in terminal area operations. Two distinct discrete-time control laws are designed to interface with velocity-command and attitude-command guidance logic, and each incorporates proportional-integral compensation for non-zero-set-point regulation, as well as reduced-order Kalman filters for sensor blending and noise rejection. Adaptation to flight condition is achieved with a novel gain-scheduling method based on correlation and regression analysis. The linear-optimal design approach is found to be a valuable tool in the development of practical multivariable control laws for vehicles which evidence significant coupling and insufficient natural stability.

  20. Three-terminal graphene negative differential resistance devices.

    PubMed

    Wu, Yanqing; Farmer, Damon B; Zhu, Wenjuan; Han, Shu-Jen; Dimitrakopoulos, Christos D; Bol, Ageeth A; Avouris, Phaedon; Lin, Yu-Ming

    2012-03-27

    A new mechanism for negative differential resistance (NDR) is discovered in three-terminal graphene devices based on a field-effect transistor configuration. This NDR effect is a universal phenomenon for graphene and is demonstrated in devices fabricated with different types of graphene materials and gate dielectrics. Operation of conventional NDR devices is usually based on quantum tunneling or intervalley carrier transfer, whereas the NDR behavior observed here is unique to the ambipolar behavior of zero-bandgap graphene and is associated with the competition between electron and hole conduction as the drain bias increases. These three terminal graphene NDR devices offer more operation flexibility than conventional two-terminal devices based on tunnel diodes, Gunn diodes, or molecular devices, and open up new opportunities for graphene in microwave to terahertz applications. © 2012 American Chemical Society

  1. A unique multi-access laser communications transceiver system

    NASA Technical Reports Server (NTRS)

    Ross, Monte

    1990-01-01

    A 'many points in one point' multiaccess laser system has been examined, and results are reported which indicating the feasibility of optical communications multiaccess communications is feasible and that the resultant terminal size and with savings are very substantial compared to the dedicated optical terminals or RF multiaccess approaches. A preliminary design has been accomplished of a package that can weigh less than 150 pounds and which uses a 10-in. effective diameter fixed telescope and requires less than 100 W of regulated power and less than 8 cu ft of space.

  2. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: Terminal Operations HITL 1B Primary Results

    NASA Technical Reports Server (NTRS)

    Rorie, Conrad; Monk, Kevin; Roberts, Zach; Brandt, Summer

    2018-01-01

    This presentation provides an overview of the primary results from the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project's second Terminal Operations human-in-the-loop simulation. This talk covers the background of this follow-on experiment, which includes an overview of the first Terminal Operations HITL performed by the project. The primary results include a look at the number and durations of detect and avoid (DAA) alerts issued by the two DAA systems under test. It also includes response time metrics and metrics on the ability of the pilot-in-command (PIC) to maintain sufficient separation. Additional interoperability metrics are included to illustrate how pilots interact with the tower controller. Implications and conclusions are covered at the end.

  3. 77 FR 9696 - Notice of Proposed Reinstatement of Terminated Oil and Gas Lease COC68134

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ...] Notice of Proposed Reinstatement of Terminated Oil and Gas Lease COC68134 AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Proposed Reinstatement of Terminated Oil and Gas Lease. SUMMARY... Management (BLM) received a petition for reinstatement of oil and gas lease COC68134 from Western Operation...

  4. 46 CFR 525.3 - Availability of marine terminal operator schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Availability of terminal schedules—(1) Availability to the Commission. A complete and current set of terminal... computer (PC) by: (1) Dial-up connection via public switched telephone networks (PSTN); or (2) The Internet (Web) by: (i) Web browser; or (ii) Telnet session. (c) Dial-up connection via PSTN. (1) This connection...

  5. 46 CFR 525.3 - Availability of marine terminal operator schedules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Availability of terminal schedules—(1) Availability to the Commission. A complete and current set of terminal... computer (PC) by: (1) Dial-up connection via public switched telephone networks (PSTN); or (2) The Internet (Web) by: (i) Web browser; or (ii) Telnet session. (c) Dial-up connection via PSTN. (1) This connection...

  6. 29 CFR 1917.26 - First aid and lifesaving facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false First aid and lifesaving facilities. 1917.26 Section 1917..., DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.26 First aid and..., to the employer. (b) A first aid kit shall be available at the terminal, and at least one person...

  7. 7 CFR 1494.801 - Enforcement and termination of agreements with CCC.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 10 2014-01-01 2014-01-01 false Enforcement and termination of agreements with CCC... Enhancement Program Operations § 1494.801 Enforcement and termination of agreements with CCC. (a) Performance in accordance with an Agreement with CCC. (1) An exporter which enters into an Agreement with CCC...

  8. 7 CFR 1494.801 - Enforcement and termination of agreements with CCC.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 10 2013-01-01 2013-01-01 false Enforcement and termination of agreements with CCC... Enhancement Program Operations § 1494.801 Enforcement and termination of agreements with CCC. (a) Performance in accordance with an Agreement with CCC. (1) An exporter which enters into an Agreement with CCC...

  9. 7 CFR 1494.801 - Enforcement and termination of agreements with CCC.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 10 2012-01-01 2012-01-01 false Enforcement and termination of agreements with CCC... Enhancement Program Operations § 1494.801 Enforcement and termination of agreements with CCC. (a) Performance in accordance with an Agreement with CCC. (1) An exporter which enters into an Agreement with CCC...

  10. Assessment of Delivery Accuracy in an Operational-Like Environment

    NASA Technical Reports Server (NTRS)

    Sharma, Shivanjli; Wynnyk, Mitch

    2016-01-01

    In order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.

  11. The Airspace Concepts Evaluation System Architecture and System Plant

    NASA Technical Reports Server (NTRS)

    Windhorst, Robert; Meyn, Larry; Manikonda, Vikram; Carlos, Patrick; Capozzi, Brian

    2006-01-01

    The Airspace Concepts Evaluation System is a simulation of the National Airspace System. It includes models of flights, airports, airspaces, air traffic controls, traffic flow managements, and airline operation centers operating throughout the United States. It is used to predict system delays in response to future capacity and demand scenarios and perform benefits assessments of current and future airspace technologies and operational concepts. Facilitation of these studies requires that the simulation architecture supports plug and play of different air traffic control, traffic flow management, and airline operation center models and multi-fidelity modeling of flights, airports, and airspaces. The simulation is divided into two parts that are named, borrowing from classical control theory terminology, control and plant. The control consists of air traffic control, traffic flow management, and airline operation center models, and the plant consists of flight, airport, and airspace models. The plant can run open loop, in the absence of the control. However, undesired affects, such as conflicts and over congestions in the airspaces and airports, can occur. Different controls are applied, "plug and played", to the plant. A particular control is evaluated by analyzing how well it managed conflicts and congestions. Furthermore, the terminal area plants consist of models of airports and terminal airspaces. Each model consists of a set of nodes and links which are connected by the user to form a network. Nodes model runways, fixes, taxi intersections, gates, and/or other points of interest, and links model taxiways, departure paths, and arrival paths. Metering, flow distribution, and sequencing functions can be applied at nodes. Different fidelity model of how a flight transits are can be used by links. The fidelity of the model can be adjusted by the user by either changing the complexity of the node/link network-or the way that the link models how the flights transit from one node to the other.

  12. 29 CFR 1917.154 - Compressed air.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.154 Compressed air. Employees shall be protected by chip guarding and personal protective equipment complying with the provisions of subpart E of...

  13. 29 CFR 1917.154 - Compressed air.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.154 Compressed air. Employees shall be protected by chip guarding and personal protective equipment complying with the provisions of subpart E of...

  14. If You Ax the Superintendent, Don't Chop Off Your Vital Options.

    ERIC Educational Resources Information Center

    Zakariya, Sally Banks

    1984-01-01

    The employment contract is the key item in superintendent firing, and thus, it should include provisions for termination. Terminations can misfire if the board does not carry out contractual obligations. Eight points of advice are included for boards that are contemplating firing a superintendent. (MD)

  15. Utilization of NASA Lewis mobile terminals for the Hermes satellite

    NASA Technical Reports Server (NTRS)

    Edelman, E. A.; Fiala, J. L.; Rizzolla, L.

    1977-01-01

    The high power of the Hermes satellite enables two-way television and voice communication with small ground terminals. The Portable Earth Terminal (PET) and the Transportable Earth Terminal (TET) were developed and built by NASA-Lewis to provide communications capability to short-term users. The NASA-Lewis mobile terminals are described in terms of vehicles and onboard equipment, as well as operation aspects, including use in the field. The section on demonstrations divides the uses into categories of medicine, education, technology and government. Applications of special interest within each category are briefly described.

  16. Operation and Maintenance Manual, Ultrasonic Fish Deterrent System

    DTIC Science & Technology

    1991-07-01

    PAGES Fishery management--Instruments 61 Ultrsonic transducers 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY CLASSIFICATION 19. SECURITY...compatible computer with a communications software package will be most convenient; however, any terminal will work. To begin operation, connect the...D. Next connect the communications cable (TC-4) between the RFPG and the terminal. An ONSET TC-4 cable must be used due to level shifting

  17. The use of LANDSAT DCS and imagery in reservoir management and operation. [New England and Alaska

    NASA Technical Reports Server (NTRS)

    Cooper, S. (Principal Investigator)

    1975-01-01

    The author has identified the following significant results. The local user terminal has proven the hypothesis that a relatively inexpensive, automatic, and easily maintained ground receive station for satellite relayed data is practical for operational use. Data acquisition activities were expanded to include both the teletype-relayed information as well as that received directly from local user terminals.

  18. Foundational Terminal Operations HITL: Experimental Design Slides

    NASA Technical Reports Server (NTRS)

    Rorie, Robert Conrad

    2017-01-01

    The UAS (Unmanned Aircraft Systems) in the NAS (National Airspace System) project is conducting its first investigation of UAS operations in the terminal environment. A workshop is being held to get input from key stakeholders on the experimental design and scenario development occuring for this simulation, which intends to begin data collection in September 2017. These slides cover the proposed design and methodolgy for the experiment.

  19. National Crime Information Center Mandatory Minimum Standards Curriculum for Full Access Terminal Operators. Volume Two--NCIC "Hot" Files.

    ERIC Educational Resources Information Center

    Federal Bureau of Investigation, Washington, DC. National Crime Information Center.

    This document is the second volume of a two-volume set of lesson plans that together make up a complete training package for full-service terminal operators. The lesson plans are designed to ensure that a state's National Crime Information Center (NCIC) training program meets Advisory Policy Board standards. (NCIC is a nationwide computerized…

  20. Initial Concept for Terminal Area Conflict Detection, Alerting, and Resolution Capability On or Near the Airport Surface, Version 2.0

    NASA Technical Reports Server (NTRS)

    Otero, Sharon D.; Barker, Glover D.; Jones, Denise R.

    2013-01-01

    The Next Generation Air Transportation System (NextGen) concept for 2025 envisions the movement of large numbers of people and goods in a safe, efficient, and reliable manner. The NextGen will remove many of the constraints in the current air transportation system, support a wider range of operations, and deliver an overall system capacity up to 3 times that of current operating levels. In order to achieve the NextGen vision, research is necessary in the areas of surface traffic optimization, maximum runway capacity, reduced runway occupancy time, simultaneous single runway operations, and terminal area conflict prevention, among others. The National Aeronautics and Space Administration (NASA) is conducting Collision Avoidance for Airport Traffic (CAAT) research to develop technologies, data, and guidelines to enable Conflict Detection and Resolution (CD&R) in the Airport Terminal Maneuvering Area (ATMA) under current and emerging NextGen operating concepts. The term ATMA was created to reflect the fact that the CD&R concept area of operation is focused near the airport within the terminal maneuvering area. In the following, an initial concept for an aircraft-based method for CD&R in the ATMA is presented. This method is based upon previous NASA work in CD&R for runway incursion prevention, the Runway Incursion Prevention System (RIPS).

  1. The 1980 Aircraft Safety and Operating Problems, Part 2

    NASA Technical Reports Server (NTRS)

    Stickle, J. W. (Compiler)

    1981-01-01

    Terminal area operations, avionics and human factors, atmospheric environment, and operating problems and potential solutions are discussed. Other topics include flight experiences, ground operations, and acoustics and noise reduction.

  2. Effectiveness of Shield Termination Techniques Tested with TEM Cell and Bulk Current Injection

    NASA Technical Reports Server (NTRS)

    Bradley, Arthur T.; Hare, Richard J.

    2009-01-01

    This paper presents experimental results of the effectiveness of various shield termination techniques. Each termination technique is evaluated by two independent noise injection methods; transverse electromagnetic (TEM) cell operated from 3 MHz 400 MHz, and bulk current injection (BCI) operated from 50 kHz 400 MHz. Both single carrier and broadband injection tests were investigated. Recommendations as to how to achieve the best shield transfer impedance (i.e. reduced coupled noise) are made based on the empirical data. Finally, the noise injection techniques themselves are indirectly evaluated by comparing the results obtained from the TEM Cell to those from BCI.

  3. A flight research program to develop airborne systems for improved terminal area operations

    NASA Technical Reports Server (NTRS)

    Reeder, J. P.

    1974-01-01

    The research program considered is concerned with the solution of operational problems for the approximate time period from 1980 to 2000. The problems are related to safety, weather effects, congestion, energy conservation, noise, atmospheric pollution, and the loss in productivity caused by delays, diversions, and schedule stretchouts. The terminal configured vehicle (TCV) program is to develop advanced flight-control capability. The various aspects of the TCV program are discussed, giving attention to avionics equipment, the piloted simulator, terminal-area environment simulation, the Wallops research facility, flight procedures, displays and human factors, flight activities, and questions of vortex-wake reduction and tracking.

  4. Coordinated Parallel Runway Approaches

    NASA Technical Reports Server (NTRS)

    Koczo, Steve

    1996-01-01

    The current air traffic environment in airport terminal areas experiences substantial delays when weather conditions deteriorate to Instrument Meteorological Conditions (IMC). Expected future increases in air traffic will put additional pressures on the National Airspace System (NAS) and will further compound the high costs associated with airport delays. To address this problem, NASA has embarked on a program to address Terminal Area Productivity (TAP). The goals of the TAP program are to provide increased efficiencies in air traffic during the approach, landing, and surface operations in low-visibility conditions. The ultimate goal is to achieve efficiencies of terminal area flight operations commensurate with Visual Meteorological Conditions (VMC) at current or improved levels of safety.

  5. 78 FR 70934 - Trespassing on DOE Property: Kansas City Plant Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-27

    ..., National Nuclear Security Administration, Kirtland Operations operating area. The facilities are described...). Addition of the Kirtland Operations operating area property does not terminate the prior Kansas City Plant...

  6. Maximizing tandem solar cell power extraction using a three-terminal design

    DOE PAGES

    Warren, Emily L.; Deceglie, Michael G.; Rienacker, Michael; ...

    2018-04-09

    Three-terminal tandem solar cells can provide a robust operating mechanism to efficiently capture the solar spectrum without the need to current match sub-cells or fabricate complicated metal interconnects.

  7. Maximizing tandem solar cell power extraction using a three-terminal design

    DOE PAGES

    Warren, Emily L.; Deceglie, Michael G.; Rienäcker, Michael; ...

    2018-01-01

    Three-terminal tandem solar cells can provide a robust operating mechanism to efficiently capture the solar spectrum without the need to current match sub-cells or fabricate complicated metal interconnects.

  8. Telephone equipment room, showing channel terminal bank with vacuum tubes. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Telephone equipment room, showing channel terminal bank with vacuum tubes. View to east - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  9. [Remote results of plastic operations on the tricuspid valve in patients with cardiac insufficiency at terminal stage].

    PubMed

    Habriielian, A V; Smorzhevs'kyĭ, V I; Onishchenko, V F; Beleĭovych, V V; Topchu, Ie I; Domans'kyĭ, T M; Myroniuk, O I

    2011-07-01

    Comparative analysis of the results of plastic operations performance on a tricuspid valve (TV) in patients, suffering cardiac insufficiency in terminal stage, was conducted. In late postoperative period the indices of intracardial hemodynamics (cardiac output fraction, regurgitation on TV) and clinical features (severity of symptoms, quality of life) after plastic operations, using a support ring, have differed significantly from those after performance of a sutured plasty. The valve function during five years was secured in 91.1% of patients.

  10. Flight Deck Display Technologies for 4DT and Surface Equivalent Visual Operations

    NASA Technical Reports Server (NTRS)

    Prinzel, Lawrence J., III; Jones, Denis R.; Shelton, Kevin J.; Arthur, Jarvis J., III; Bailey, Randall E.; Allamandola, Angela S.; Foyle, David C.; Hooey, Becky L.

    2009-01-01

    NASA research is focused on flight deck display technologies that may significantly enhance situation awareness, enable new operating concepts, and reduce the potential for incidents/accidents for terminal area and surface operations. The display technologies include surface map, head-up, and head-worn displays; 4DT guidance algorithms; synthetic and enhanced vision technologies; and terminal maneuvering area traffic conflict detection and alerting systems. This work is critical to ensure that the flight deck interface technologies and the role of the human participants can support the full realization of the Next Generation Air Transportation System (NextGen) and its novel operating concepts.

  11. Lunar Communication Terminals for NASA Exploration Missions: Needs, Operations Concepts and Architectures

    NASA Technical Reports Server (NTRS)

    Bhasin, Kul B.; Warner, Joseph D.; Anderson, Lynn M.

    2008-01-01

    NASA is conducting architecture studies prior to deploying a series of short- and long-duration human and robotic missions for the exploration of the Moon and Mars under the Vision for Space Exploration Initiative. A key objective of these missions is to establish and expand, through a series of launches, a system of systems approach to exploration capabilities and science return. The systems identified were Crew Exploration Vehicles, crew and cargo launch vehicles, crew EVA suits, crew and cargo landers, habitats, mobility carriers, and small, pressurized rovers. Multiple space communication networks and systems, deployed over time, will support these space exploration systems of systems. Each deployment phase will support interoperability of components and provide 20 years of legacy systems. In this paper, we describe the modular lunar communications terminals needed for the emerging lunar mission operational scenarios. These lunar communication terminals require flexibility for use in stationary, integrated, and mobile environments. They will support links directly to Earth, to lunar relay satellites, to astronauts and to fixed and mobile lunar surface systems. The operating concepts and traffic models are presented for these terminals within variety of lunar scenarios. A preliminary architecture is outlined, providing for suitable long-duration operations in the harsh lunar environment.

  12. A flight evaluation of VTOL jet transport under visual and simulated instrument conditions

    NASA Technical Reports Server (NTRS)

    Holzhauser, C. A.; Morello, S. A.; Innis, R. C.; Patton, J. M., Jr.

    1972-01-01

    A flight investigation was performed with the Dornier DO-31 VTOL to evaluate the performance, handling qualities, and operating characteristics that are considered to be important in the operation of a commerical VTOL transport in the terminal area. The DO-31, a 20,000 kilogram transport, has a mixed jet propulsion system; main engines with nozzles deflect from a cruise to a hover position, and vertical lift engines operated below 170 knots. This VTOL mode incorporates pitch and roll attitude and yaw rate stabilization. The tests concentrated on the transition, approach, and vertical landing. The mixed jet propulsion system provided a large usable performance envelope that enabled simulated IFR approaches to be made on 7 deg and 12 deg glide slopes. In these approaches management of thrust magnitude and direction was a primary problem, and some form of integrating the controls will be necessary. The handling qualities evaluation pointed out the need for additional research of define flight path criteria. The aircraft had satisfactory control and stability in hover out of ground effect. The recirculation effects in vertical landing were large below 15 meters.

  13. Airborne Precision Spacing for Dependent Parallel Operations Interface Study

    NASA Technical Reports Server (NTRS)

    Volk, Paul M.; Takallu, M. A.; Hoffler, Keith D.; Weiser, Jarold; Turner, Dexter

    2012-01-01

    This paper describes a usability study of proposed cockpit interfaces to support Airborne Precision Spacing (APS) operations for aircraft performing dependent parallel approaches (DPA). NASA has proposed an airborne system called Pair Dependent Speed (PDS) which uses their Airborne Spacing for Terminal Arrival Routes (ASTAR) algorithm to manage spacing intervals. Interface elements were designed to facilitate the input of APS-DPA spacing parameters to ASTAR, and to convey PDS system information to the crew deemed necessary and/or helpful to conduct the operation, including: target speed, guidance mode, target aircraft depiction, and spacing trend indication. In the study, subject pilots observed recorded simulations using the proposed interface elements in which the ownship managed assigned spacing intervals from two other arriving aircraft. Simulations were recorded using the Aircraft Simulation for Traffic Operations Research (ASTOR) platform, a medium-fidelity simulator based on a modern Boeing commercial glass cockpit. Various combinations of the interface elements were presented to subject pilots, and feedback was collected via structured questionnaires. The results of subject pilot evaluations show that the proposed design elements were acceptable, and that preferable combinations exist within this set of elements. The results also point to potential improvements to be considered for implementation in future experiments.

  14. Hunting for cosmic neutrinos under the deep sea: the ANTARES experiment

    NASA Astrophysics Data System (ADS)

    Flaminio, Vincenzo

    2013-06-01

    Attempts to detect high energy neutrinos originating in violent Galactic or Extragalactic processes have been carried out for many years, both using the polar-cap ice and the sea as a target/detection medium. The first large detector built and operated for several years has been the AMANDA Ĉerenkov array, installed under about two km of ice at the South Pole. More recently a much larger detector, ICECUBE has been successfully installed and operated at the same location. Attempts by several groups to install similar arrays under large sea depths have been carried out following the original pioneering attempts by the DUMAND collaboration, initiated in 1990 and terminated only six years later. ANTARES has been so far the only detector deployed at large sea depths and successfully operated for several years. It has been installed in the Mediterranean by a large international collaboration and is in operation since 2007. I describe in the following the experimental technique, the sensitivity of the experiment, the detector performance and the first results that have been obtained in the search for neutrinos from cosmic point sources and on the oscillations of atmospheric neutrinos.

  15. 77 FR 808 - Certain Components for Installation of Marine Autopilots With GPS or IMU; Termination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... United States after importation of certain components for installation of marine autopilots with GPS or IMU (i.e., devices for pointing and stabilizing marine navigation equipment) by reason of infringement... of Marine Autopilots With GPS or IMU; Termination of Investigation on the Basis of Settlement AGENCY...

  16. Losing a father all over again: the termination of an analysis of an adolescent boy suffering from father loss.

    PubMed

    Sugarman, Alan

    2010-08-01

    Criteria for beginning and conducting the termination phase of psychoanalysis have provoked debate and confusion from the early days of psychoanalysis. Gabbard (2009) has recently pointed to the field's tendency to cling to idealized versions of these criteria as a way to deal with disagreements. The situation becomes more complicated for child and adolescent psychoanalysts because their patients are in the midst of a developmental process at the very time they are engaged in a psychoanalytic process. The termination phase of an adolescent male suffering from father loss is presented in depth in order to provide clinical data toward further consideration of the vexing questions surrounding termination in psychoanalysis. His termination is used to examine the relative importance of losing the analyst as a transference object as against a developmental object; the meaning of action during termination; the complicating role of trauma vis-à-vis termination; and the importance of the post-termination phase of analysis. It is suggested that his termination phase demonstrates that a "good enough" termination involves the development of a self-analyzing capacity that continues to evolve and develop after termination.

  17. Investigation of the use of an electronic multifunction display and an electromechanical horizontal situation indicator for guidance and control of powered-lift short-haul aircraft

    NASA Technical Reports Server (NTRS)

    Clement, W. F.

    1976-01-01

    The use which pilots make of a moving map display from en route through the terminal area and including the approach and go-around flight phases was investigated. The content and function of each of three primary STOLAND displays are reviewed from an operational point of view. The primary displays are the electronic attitude director indicator (EADI), the horizontal situation indicator (HSI), and the multifunction display (MFD). Manually controlled flight with both flight director guidance and raw situation data is examined in detail in a simulated flight experiment with emphasis on tracking reference flight plans and maintaining geographic orientation after missed approaches. Eye-point-of-regard and workload measurements, coupled with task performance measurements, pilot opinion ratings, and pilot comments are presented. The experimental program was designed to offer a systematic objective and subjective comparison of pilots' use of the moving map MFD in conjunction with the other displays.

  18. SMART operational field test evaluation : operations database report : final report

    DOT National Transportation Integrated Search

    1997-09-01

    Based on the Suburban Mobility Authority For Regional Transportations (SMART) weekly operating reports from its Macomb, Wayne, Troy, and Pontiac terminals, this Operations Database Report explores productivity measures over time, and examines how ...

  19. ACTS propagation terminal update

    NASA Technical Reports Server (NTRS)

    Stutzman, Warren L.; Pratt, Tim

    1992-01-01

    The activities at Virginia Polytechnic Institute and State University in preparation for the February 1993 launch of ACTS are summarized. ACTS propagation terminals (APT) are being constructed to receive the 20 and 27.5 GHz ACTS beacon signals. Total power radiometers operating at the same frequencies are integrated into the terminal for use in level setting. Recent progress and plans for APT's are reported.

  20. Folding and conformational consequences of glycine to alanine replacements at different positions in a collagen model peptide.

    PubMed

    Bhate, Manjiri; Wang, Xin; Baum, Jean; Brodsky, Barbara

    2002-05-21

    The collagen model peptide T1-892 includes a C-terminal nucleation domain, (Gly-Pro-Hyp)(4), and an N-terminal (Gly-X-Y)(6) sequence taken from type I collagen. In osteogenesis imperfecta (OI) and other collagen diseases, single base mutations often convert one Gly to a larger residue, and T1-892 homologues modeling such mutations were synthesized with Gly to Ala substitutions in either the (Gly-Pro-Hyp)(4) domain, Gly25Ala, or the (Gly-X-Y)(6) domain, Gly10Ala. CD and NMR studies show the Gly10Ala peptide forms a normal triple-helix at the C-terminal end and propagates from the C- to the N-terminus until the Gly --> Ala substitution is encountered. At this point, triple-helix folding is terminated and cannot be reinitiated, leaving a nonhelical N-terminus. A decreased thermal stability is observed as a result of the shorter length of the triple-helix. In contrast, introduction of the Gly to Ala replacement at position 25, in the nucleation domain, shifts the monomer/trimer equilibrium toward the monomer form. The increased monomer and lower trimer populations are reflected in the dramatic decrease in triple-helix content and stability. Unlike the Ala replacement at position 10, the Ala substitution in the (Gly-Pro-Hyp)(4) region can still be incorporated into a triple-helix, but at a greatly decreased rate of folding, since the original efficient nucleation site is no longer operative. The specific consequences of Gly to Ala replacements in two distinctive sequences in this triple-helical peptide may help clarify the variability in OI clinical severity resulting from mutations at different sites along type I collagen chains.

  1. Ka-band MMIC array system for ACTS aeronautical terminal experiment (Aero-X)

    NASA Technical Reports Server (NTRS)

    Raquet, Charles A.; Zakrajsek, Robert J.; Lee, Richard Q.; Andro, Monty; Turtle, John P.

    1995-01-01

    During the summer of 1994, the Advanced Communication Technology Satellite (ACTS) Aeronautical Terminal Experiment (Aero-X) was successfully completed by the NASA Lewis Research Center (LeRC) and the Jet Propulsion Laboratory (JPL). 4.8 and 9.6 Kbps duplex voice links were established between the LeRC Learjet and the ACTS Link Evaluation Terminal (LET) in Cleveland, Ohio, via the ACTS. The antenna system used in this demonstration was developed by LeRC and featured LeRC and US Air Force experimental arrays using GaAs MMIC devices at each radiating element for electronic beam steering and distributed power amplification. The antenna system consisted of three arrays mounted inside the LeRC Learjet, pointing out through the windows. An open loop tracking controller developed by LeRC used information from the aircraft position and attitude sensors to automatically steer the arrays toward ACTS during flight JPL ACTS Mobile Terminal (AMT) system hardware was used as transceivers both on the aircraft and at the LET. The single 32 element MMIC transmit array developed by NASA/LeRC and Texas Instruments has an EIRP of 23.4 dBW at boresight. The two 20 GHz MMIC receive arrays were developed in a cooperative effort with the USAF Rome Laboratory/Electronic System Center, taking advantage of existing USAF array development contracts with Boeing and Martin Marietta. The Boeing array has 23 elements and a G/T of 16/6 db/degK at boresight. The Martin Marietta array has 16 elements and a G/T of 16.1 db/degK at boresight. The three proof-of-concept arrays, the array control system and their integration and operation in the Learjet for Aero-X are described.

  2. Implementation method of multi-terminal DC control system

    NASA Astrophysics Data System (ADS)

    Yi, Liu; Hao-Ran, Huang; Jun-Wen, Zhou; Hong-Guang, Guo; Yu-Yong, Zhou

    2018-04-01

    Currently the multi-terminal DC system (MTDC) has more stations. Each station needs operators to monitor and control the device. It needs much more operation and maintenance, low efficiency and small reliability; for the most important reason, multi-terminal DC system has complex control mode. If one of the stations has some problem, the control of the whole system should have problems. According to research of the characteristics of multi-terminal DC (VSC-MTDC) systems, this paper presents a strong implementation of the multi-terminal DC Supervisory Control and Data Acquisition (SCADA) system. This system is intelligent, can be networking, integration and intelligent. A master control system is added in each station to communication with the other stations to send current and DC voltage value to pole control system for each station. Based on the practical application and information feedback in the China South Power Grid research center VSC-MTDC project, this system is higher efficiency and save the cost on the maintenance of convertor station to improve the intelligent level and comprehensive effect. And because of the master control system, a multi-terminal system hierarchy coordination control strategy is formed, this make the control and protection system more efficiency and reliability.

  3. Terminal attractors for addressable memory in neural networks

    NASA Technical Reports Server (NTRS)

    Zak, Michail

    1988-01-01

    A new type of attractors - terminal attractors - for an addressable memory in neural networks operating in continuous time is introduced. These attractors represent singular solutions of the dynamical system. They intersect (or envelope) the families of regular solutions while each regular solution approaches the terminal attractor in a finite time period. It is shown that terminal attractors can be incorporated into neural networks such that any desired set of these attractors with prescribed basins is provided by an appropriate selection of the weight matrix.

  4. Aircraft Design Considerations to Meet One Engine Inoperative (OEI) Safety Requirements

    NASA Technical Reports Server (NTRS)

    Scott, Mark W.

    2012-01-01

    Commercial airlines are obligated to operate such that an aircraft can suffer an engine failure at any point in its mission and terminate the flight without an accident. Only minimal aircraft damage is allowable, such as brake replacement due to very heavy application, or an engine inspection and/or possible removal due to use of an emergency rating. Such performance criteria are often referred to as zero exposure, referring to zero accident exposure to an engine failure. The critical mission segment for meeting one engine inoperative (OEI) criteria is takeoff. For a given weight, wind, and ambient condition, fixed wing aircraft require a balanced field length. This is the longer of the distance to take off if an engine fails at a predetermined critical point in the takeoff profile, or the distance to reject the takeoff and brake to a stop. Rotorcraft have requirements for horizontal takeoff procedures that are equivalent to a balanced field length requirements for fixed wing aircraft. Rotorcraft also perform vertical procedures where no runway or heliport distance is available. These were developed primarily for elevated heliports as found on oil rigs or rooftops. They are also used for ground level operations as might be found at heliports at the end of piers or other confined areas.

  5. Saccharomyces cerevisiae RNA Polymerase I Terminates Transcription at the Reb1 Terminator In Vivo

    PubMed Central

    Reeder, Ronald H.; Guevara, Palmira; Roan, Judith G.

    1999-01-01

    We have mapped transcription termination sites for RNA polymerase I in the yeast Saccharomyces cerevisiae. S1 nuclease mapping shows that the primary terminator is the Reb1p terminator located at +93 downstream of the 3′ end of 25S rRNA. Reverse transcription coupled with quantitative PCR shows that approximately 90% of all transcripts terminate at this site. Transcripts which read through the +93 site quantitatively terminate at a fail-safe terminator located further downstream at +250. Inactivation of Rnt1p (an RNase III involved in processing the 3′ end of 25S rRNA) greatly stabilizes transcripts extending to both sites and increases readthrough at the +93 site. In vivo assay of mutants of the Reb1p terminator shows that this site operates in vivo by the same mechanism as has previously been delineated through in vitro studies. PMID:10523625

  6. System issues and considerations associated with design of ground mobile strategic satellite communication terminals

    NASA Astrophysics Data System (ADS)

    Poliakon, J. A.

    The current national defense doctrine calls for increased use of ground mobile strategic satellite communication earth terminals. This paper discusses some of the key communication terminal system issues and considerations associated with the design of nuclear hardened strategic ground mobile earth terminals. It considers system requirements such as nuclear hardness, rapid mobility, low profile, signal interference resistance, high availability, and long term independent operation. It also discusses impacts and implications associated with these requirements when imposed on a satellite earth terminal. It gives special focus to the ramifications of imposing mobility on earth terminals and its relationship to the system design approach used to arrive at an optimal system solution.

  7. Anatomy of hierarchy: Feedforward and feedback pathways in macaque visual cortex

    PubMed Central

    Markov, Nikola T; Vezoli, Julien; Chameau, Pascal; Falchier, Arnaud; Quilodran, René; Huissoud, Cyril; Lamy, Camille; Misery, Pierre; Giroud, Pascale; Ullman, Shimon; Barone, Pascal; Dehay, Colette; Knoblauch, Kenneth; Kennedy, Henry

    2013-01-01

    The laminar location of the cell bodies and terminals of interareal connections determines the hierarchical structural organization of the cortex and has been intensively studied. However, we still have only a rudimentary understanding of the connectional principles of feedforward (FF) and feedback (FB) pathways. Quantitative analysis of retrograde tracers was used to extend the notion that the laminar distribution of neurons interconnecting visual areas provides an index of hierarchical distance (percentage of supragranular labeled neurons [SLN]). We show that: 1) SLN values constrain models of cortical hierarchy, revealing previously unsuspected areal relations; 2) SLN reflects the operation of a combinatorial distance rule acting differentially on sets of connections between areas; 3) Supragranular layers contain highly segregated bottom-up and top-down streams, both of which exhibit point-to-point connectivity. This contrasts with the infragranular layers, which contain diffuse bottom-up and top-down streams; 4) Cell filling of the parent neurons of FF and FB pathways provides further evidence of compartmentalization; 5) FF pathways have higher weights, cross fewer hierarchical levels, and are less numerous than FB pathways. Taken together, the present results suggest that cortical hierarchies are built from supra- and infragranular counterstreams. This compartmentalized dual counterstream organization allows point-to-point connectivity in both bottom-up and top-down directions. PMID:23983048

  8. Dual power, constant speed electric motor system

    DOEpatents

    Kirschbaum, H.S.

    1984-07-31

    A dual capacity permanent split capacitor electric motor system is provided with a stator having main and auxiliary windings. The main stator winding includes two winding sections which are connected in parallel with each other and across a pair of line terminals while the auxiliary winding is connected in series with a capacitor to form a circuit branch which is connected between the line terminals for operation at a first output power level. Switching means are provided to reconnect the main stator winding sections in series with each other and in series with a second capacitor to form a circuit branch which is connected between the line terminals while the stator auxiliary winding is connected directly between the line terminals for operation at a second output power level. Automatic rotation reversal occurs when the motor switches from the first to the second output power level. 6 figs.

  9. Dual power, constant speed electric motor system

    DOEpatents

    Kirschbaum, Herbert S.

    1984-01-01

    A dual capacity permanent split capacitor electric motor system is provided with a stator having main and auxiliary windings. The main stator winding includes two winding sections which are connected in parallel with each other and across a pair of line terminals while the auxiliary winding is connected in series with a capacitor to form a circuit branch which is connected between the line terminals for operation at a first output power level. Switching means are provided to reconnect the main stator winding sections in series with each other and in series with a second capacitor to form a circuit branch which is connected between the line terminals while the stator auxiliary winding is connected directly between the line terminals for operation at a second output power level. Automatic rotation reversal occurs when the motor switches from the first to the second output power level.

  10. Investigations of the Mars Upper Atmosphere with ExoMars Trace Gas Orbiter

    NASA Astrophysics Data System (ADS)

    López-Valverde, Miguel A.; Gerard, Jean-Claude; González-Galindo, Francisco; Vandaele, Ann-Carine; Thomas, Ian; Korablev, Oleg; Ignatiev, Nikolai; Fedorova, Anna; Montmessin, Franck; Määttänen, Anni; Guilbon, Sabrina; Lefevre, Franck; Patel, Manish R.; Jiménez-Monferrer, Sergio; García-Comas, Maya; Cardesin, Alejandro; Wilson, Colin F.; Clancy, R. T.; Kleinböhl, Armin; McCleese, Daniel J.; Kass, David M.; Schneider, Nick M.; Chaffin, Michael S.; López-Moreno, José Juan; Rodríguez, Julio

    2018-02-01

    The Martian mesosphere and thermosphere, the region above about 60 km, is not the primary target of the ExoMars 2016 mission but its Trace Gas Orbiter (TGO) can explore it and address many interesting issues, either in-situ during the aerobraking period or remotely during the regular mission. In the aerobraking phase TGO peeks into thermospheric densities and temperatures, in a broad range of latitudes and during a long continuous period. TGO carries two instruments designed for the detection of trace species, NOMAD and ACS, which will use the solar occultation technique. Their regular sounding at the terminator up to very high altitudes in many different molecular bands will represent the first time that an extensive and precise dataset of densities and hopefully temperatures are obtained at those altitudes and local times on Mars. But there are additional capabilities in TGO for studying the upper atmosphere of Mars, and we review them briefly. Our simulations suggest that airglow emissions from the UV to the IR might be observed outside the terminator. If eventually confirmed from orbit, they would supply new information about atmospheric dynamics and variability. However, their optimal exploitation requires a special spacecraft pointing, currently not considered in the regular operations but feasible in our opinion. We discuss the synergy between the TGO instruments, specially the wide spectral range achieved by combining them. We also encourage coordinated operations with other Mars-observing missions capable of supplying simultaneous measurements of its upper atmosphere.

  11. Arrhythmia Termination Versus Elimination of Dormant Pulmonary Vein Conduction as a Procedural End Point of Catheter Ablation for Paroxysmal Atrial Fibrillation: A Prospective Randomized Trial.

    PubMed

    Theis, Cathrin; Konrad, Torsten; Mollnau, Hanke; Sonnenschein, Sebastian; Kämpfner, Denise; Potstawa, Maik; Ocete, Blanca Quesada; Bock, Karsten; Himmrich, Ewald; Münzel, Thomas; Rostock, Thomas

    2015-10-01

    Pulmonary vein isolation (PVI) is still associated with a substantial number of arrhythmia recurrences in paroxysmal atrial fibrillation (AF). This prospective, randomized study aimed to compare 2 different procedural strategies. A total of 152 patients undergoing de novo ablation for paroxysmal AF were randomized to 2 different treatment arms. The procedure in group A consisted of PVI exclusively. In this group, all isolated PVs were challenged with adenosine to reveal and ablate dormant conduction. In group B, PVI was performed with the patient either in spontaneous or in induced AF. If AF did not terminate with PVI, ablation was continued by targeting extra-PV AF sources with the desired procedural end point of termination to sinus rhythm. Primary study end point was freedom from arrhythmia during 1-year follow-up. In group A, adenosine provoked dormant conduction in 31 (41%) patients with a mean of 1.6±0.8 transiently recovered PVs per patient. Termination of AF during PVI was observed in 31 (65%) patients, whereas AF persisted afterward in 17 (35%) patients. AF termination occurred in 13 (76%) patients by AF source ablation. After 1-year follow-up, significantly more group B patients were free of arrhythmia recurrences (87 versus 68%; P=0.006). During redo ablation, the rate of PV reconduction did not differ between both groups (group A: 55% versus group B: 61%; P=0.25). Elimination of extra-PV AF sources after PVI is superior to sole PV isolation with the adjunct of abolishing potential dormant conduction. URL: http://www.clinicaltrials.gov. Unique identifier: NCT02238392. © 2015 The Authors.

  12. An exploratory study to determine the integrated technological air transportation system ground requirements of liquid-hydrogen-fueled subsonic, long-haul civil air transports

    NASA Technical Reports Server (NTRS)

    1976-01-01

    A baseline air terminal concept was developed which permitted airlines and the airport to operate JP- or LH2-fueled aircraft at common terminal gates. The concept included installation of a hydrogen liquefaction and storage facility on airport property, as well as the fuel distribution system. The capital investment and hydrogen-related operating costs to the airlines were estimated.

  13. Angle of Attack Modulation for Mars Entry Terminal State Optimization

    NASA Technical Reports Server (NTRS)

    Lafleur, Jarret M.; Cerimele, Christopher J.

    2009-01-01

    From the perspective of atmospheric entry, descent, and landing (EDL), one of the most foreboding destinations in the solar system is Mars due in part to its exceedingly thin atmosphere. To benchmark best possible scenarios for evaluation of potential Mars EDL system designs, a study is conducted to optimize the entry-to-terminal-state portion of EDL for a variety of entry velocities and vehicle masses, focusing on the identification of potential benefits of enabling angle of attack modulation. The terminal state is envisioned as one appropriate for the initiation of terminal descent via parachute or other means. A particle swarm optimizer varies entry flight path angle, ten bank profile points, and ten angle of attack profile points to find maximum-final-altitude trajectories for a 10 30 m ellipsled at 180 different combinations of values for entry mass, entry velocity, terminal Mach number, and minimum allowable altitude. Parametric plots of maximum achievable altitude are shown, as are examples of optimized trajectories. It is shown that appreciable terminal state altitude gains (2.5-4.0 km) over pure bank angle control may be possible if angle of attack modulation is enabled for Mars entry vehicles. Gains of this magnitude could prove to be enabling for missions requiring high-altitude landing sites. Conclusions are also drawn regarding trends in the bank and angle of attack profiles that produce the optimal trajectories in this study, and directions for future work are identified.

  14. Quantum propagation in single mode fiber

    NASA Technical Reports Server (NTRS)

    Joneckis, Lance G.; Shapiro, Jeffrey H.

    1994-01-01

    This paper presents a theory for quantum light propagation in a single-mode fiber which includes the effects of the Kerr nonlinearity, group-velocity dispersion, and linear loss. The theory reproduces the results of classical self-phase modulation, quantum four-wave mixing, and classical solution physics, within their respective regions of validity. It demonstrates the crucial role played by the Kerr-effect material time constant, in limiting the quantum phase shifts caused by the broadband zero-point fluctuations that accompany any quantized input field. Operator moment equations - approximated, numerically, via a terminated cumulant expansion - are used to obtain results for homodyne-measurement noise spectra when dispersion is negligible. More complicated forms of these equations can be used to incorporate dispersion into the noise calculations.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boskey, Adele L., E-mail: boskeya@hss.edu; Christensen, Brian, E-mail: bc@mb.au.dk; Taleb, Hayat, E-mail: Talebh@hss.edu

    Highlights: Black-Right-Pointing-Pointer Thrombin-cleaved fragments of milk-osteopontin effect hydroxyapatite formation differently. Black-Right-Pointing-Pointer N- and C-terminal fragments promoted hydroxyapatite formation and growth. Black-Right-Pointing-Pointer A central fragment inhibited hydroxyapatite formation and growth. Black-Right-Pointing-Pointer Binding to collagen or hydroxyapatite seed crystals modified these effects. -- Abstract: The manuscript tests the hypothesis that posttranslational modification of the SIBLING family of proteins in general and osteopontin in particular modify the abilities of these proteins to regulate in vitro hydroxyapatite (HA) formation. Osteopontin has diverse effects on hydroxyapatite (HA) mineral crystallite formation and growth depending on the extent of phosphorylation. We hypothesized that different regions of full-lengthmore » OPN would also have distinct effects on the mineralization process. Thrombin fragmentation of milk OPN (mOPN) was used to test this hypothesis. Three fragments were tested in a de novo HA formation assay; an N-terminal fragment (aa 1-147), a central fragment (aa 148-204) denoted SKK-fragment and a C-terminal fragment (aa 205-262). Compared to intact mOPN the C- and N-terminal fragments behaved comparably, promoting HA formation and growth, but the central SKK-fragment acted as a mineralization inhibitor. In a seeded growth experiment all fragments inhibited mineral proliferation, but the SKK-fragment was the most effective inhibitor. These effects, seen in HA-formation and seeded growth assays in a gelatin gel system and in a pH-stat experiment were lost when the protein or fragments were dephosphorylated. Effects of the fully phosphorylated protein and fragments were also altered in the presence of fibrillar collagen. The diverse effects can be explained in terms of the intrinsically disordered nature of OPN and its fragments which enable them to interact with their multiple partners.« less

  16. The human Ino80 binds to microtubule via the E-hook of tubulin: Implications for the role in spindle assembly

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, Eun-Jung; Hur, Shin-Kyoung; Lee, Han-Sae

    2011-12-16

    Highlights: Black-Right-Pointing-Pointer The N-terminal domain of hIno80 is important for binding to the spindle. Black-Right-Pointing-Pointer The hIno80 N-terminal domain binds to tubulin and microtubule in vitro. Black-Right-Pointing-Pointer The E-hook of tubulin is critical for hIno80 binding to tubulin and microtubule. Black-Right-Pointing-Pointer Tip49a does not bind to microtubule and dispensable for spindle formation. -- Abstract: The human INO80 chromatin remodeling complex, comprising the Ino80 ATPase (hIno80) and the associated proteins such as Tip49a, has been implicated in a variety of nuclear processes other than transcription. We previously have found that hIno80 interacts with tubulin and co-localizes with the mitotic spindle andmore » is required for spindle formation. To better understand the role of hIno80 in spindle formation, we further investigated the interaction between hIno80 and microtubule. Here, we show that the N-terminal domain, dispensable for the nucleosome remodeling activity, is important for hIno80 to interact with tubulin and co-localize with the spindle. The hIno80 N-terminal domain binds to monomeric tubulin and polymerized microtubule in vitro, and the E-hook of tubulin, involved in the polymerization of microtubule, is critical for this binding. Tip49a, which has been reported to associate with the spindle, does not bind to microtubule in vitro and dispensable for spindle formation in vivo. These results suggest that hIno80 can play a direct role in the spindle assembly independent of its chromatin remodeling activity.« less

  17. The termination phase of psychoanalysis as seen through the lens of the dream.

    PubMed

    Grenell, Gary

    2002-01-01

    The decision about when to terminate analysis has long been underpinned by a theory-driven criterion model, which may steer the analytic dialogue away from its customary activities of free association, empathic listening, and interpretation. As a remedy to this situation, the author proposes that by paying careful attention to less consciously crafted patient communications such as dreams, the analytic dyad can consider readiness to set a termination date from a perspective that is context-sensitive and less encumbered by preordained criteria. Tracing the dreams of one analysand from the vantage point of contemporary dream theory, the author demonstrates how careful attention to the dream elucidated the patient's readiness to terminate and her complex feelings about the termination process. Finally, the author challenges the notion that the termination phase is of greater evaluative than therapeutic importance, and provides clinical material as evidence that this is not the case.

  18. III-V/Si Tandem Cells Utilizing Interdigitated Back Contact Si Cells and Varying Terminal Configurations: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schnabel, Manuel; Klein, Talysa R.; Jain, Nikhil

    Solar cells made from bulk crystalline silicon (c-Si) dominate the market, but laboratory efficiencies have stagnated because the current record efficiency of 26.3% is already very close to the theoretical limit of 29.4% for a single-junction c-Si cell. In order to substantially boost the efficiency of Si solar cells we have been developing stacked III-V/Si tandem cells, recently attaining efficiencies above 32% in four-terminal configuration. In this contribution, we use state-of-the-art III-V cells coupled with equivalent circuit simulations to compare four-terminal (4T) to three- and two-terminal (3T, 2T) operation. Equivalent circuit simulations are used to show that tandem cells canmore » be operated just as efficiently using three terminals as with four terminals. However, care must be taken not to overestimate 3T efficiency, as the two circuits used to extract current interact, and a method is described to accurately determine this efficiency. Experimentally, a 4T GaInP/Si tandem cell utilizing an interdigitated back contact cell is shown, exhibiting a 4T efficiency of 31.5% and a 2T efficiency of 28.1%. In 3T configuration, it is used to verify the finding from simulation that 3T efficiency is overestimated when interactions between the two circuits are neglected. Considering these, a 3T efficiency approaching the 4T efficiency is found, showing that 3T operation is efficient, and an outlook on fully integrated high-efficiency 3T and 2T tandem cells is given.« less

  19. Improving cell penetration of helical peptides stabilized by N-terminal crosslinked aspartic acids.

    PubMed

    Zhao, Hui; Jiang, Yanhong; Tian, Yuan; Yang, Dan; Qin, Xuan; Li, Zigang

    2017-01-04

    Cell penetration and nucleus translocation efficiency are important for the cellular activities of peptide therapeutics. For helical peptides stabilized by N-terminal crosslinked aspartic acid, correlations between their penetration efficiency/nucleus translocation and physicochemical properties were studied. An increase in hydrophobicity and isoelectric point will promote cellular uptake and nucleus translocation of stabilized helices.

  20. 48 CFR 52.247-52 - Clearance and Documentation Requirements-Shipments to DOD Air or Water Terminal Transshipment...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Clearance and Documentation Requirements-Shipments to DOD Air or Water Terminal Transshipment Points. 52.247-52 Section 52.247-52 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES...

  1. Implementation of the Enhanced Flight Termination System at National Aeronautics and Space Administration Dryden Flight Research Center

    NASA Technical Reports Server (NTRS)

    Tow, David

    2010-01-01

    This paper discusses the methodology, requirements, tests, and results of the implementation of the current operating capability for the Enhanced Flight Termination System (EFTS) at the National Aeronautics and Space Administration (NASA) Dryden Flight Research Center (DFRC). The implementation involves the development of the EFTS at NASA DFRC starting from the requirements to system safety review to full end to end system testing, and concluding with the acceptance of the system as an operational system. The paper discusses the first operational usage and subsequent flight utilizing EFTS successfully.

  2. MIL-H-8501B: Application to shipboard terminal operations

    NASA Technical Reports Server (NTRS)

    Cappetta, A. N.; Johns, J. B.

    1993-01-01

    The philosophy and structure of the proposed U.S. Military Specification for Handling Qualities Requirements for Military Rotorcraft, MIL-H-8501B, are presented with emphasis on shipboard terminal operations. The impact of current and future naval operational requirements on the selection of appropriate combinations of basic vehicle dynamics and usable cue environments are identified. An example 'walk through' of MIL-H-8501B is conducted from task identification to determination of stability and control requirements. For selected basic vehicle dynamics, criteria as a function of input/response magnitude are presented. Additionally, rotorcraft design development implications are discussed.

  3. Evaluation of Flight Deck-Based Interval Management Crew Procedure Feasibility

    NASA Technical Reports Server (NTRS)

    Wilson, Sara R.; Murdoch, Jennifer L.; Hubbs, Clay E.; Swieringa, Kurt A.

    2013-01-01

    Air traffic demand is predicted to increase over the next 20 years, creating a need for new technologies and procedures to support this growth in a safe and efficient manner. The National Aeronautics and Space Administration's (NASA) Air Traffic Management Technology Demonstration - 1 (ATD-1) will operationally demonstrate the feasibility of efficient arrival operations combining ground-based and airborne NASA technologies. The integration of these technologies will increase throughput, reduce delay, conserve fuel, and minimize environmental impacts. The ground-based tools include Traffic Management Advisor with Terminal Metering for precise time-based scheduling and Controller Managed Spacing decision support tools for better managing aircraft delay with speed control. The core airborne technology in ATD-1 is Flight deck-based Interval Management (FIM). FIM tools provide pilots with speed commands calculated using information from Automatic Dependent Surveillance - Broadcast. The precise merging and spacing enabled by FIM avionics and flight crew procedures will reduce excess spacing buffers and result in higher terminal throughput. This paper describes a human-in-the-loop experiment designed to assess the acceptability and feasibility of the ATD-1 procedures used in a voice communications environment. This experiment utilized the ATD-1 integrated system of ground-based and airborne technologies. Pilot participants flew a high-fidelity fixed base simulator equipped with an airborne spacing algorithm and a FIM crew interface. Experiment scenarios involved multiple air traffic flows into the Dallas-Fort Worth Terminal Radar Control airspace. Results indicate that the proposed procedures were feasible for use by flight crews in a voice communications environment. The delivery accuracy at the achieve-by point was within +/- five seconds and the delivery precision was less than five seconds. Furthermore, FIM speed commands occurred at a rate of less than one per minute, and pilots found the frequency of the speed commands to be acceptable at all times throughout the experiment scenarios.

  4. Second Line of Defense, Port of Buenos Aires and Exolgan Container Terminal Operational Testing and Evaluation Plan, Buenos Aires, Argentina

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, Bryan W.

    2012-08-23

    The Office of the Second Line of Defense (SLD) Megaports project team for Argentina will conduct operational testing and evaluation (OT&E) at Exolgan Container Terminal at the Port of Dock Sud from July 16-20, 2012; and at the Port of Buenos Aires from September 3-7, 2012. SLD is installing radiation detection equipment to screen export, import, and transshipment containers at these locations. The purpose of OT&E is to validate and baseline an operable system that meets the SLD mission and to ensure the system continues to perform as expected in an operational environment with Argentina Customs effectively adjudicating alarms.

  5. Very-High-Frequency Aerosat Airborne Terminal

    DOT National Transportation Integrated Search

    1977-12-01

    This report summarizes the result of a study aimed at defining the airborne VHF terminal for the experimental AEROSAT program. The system consists of a 22-channel VHF transceiver for full-duplex operation. Provisions are made for voice, data, and sur...

  6. Unusually long-lived pause required for regulation of a Rho-dependent transcription terminator.

    PubMed

    Hollands, Kerry; Sevostiyanova, Anastasia; Groisman, Eduardo A

    2014-05-13

    Up to half of all transcription termination events in bacteria rely on the RNA-dependent helicase Rho. However, the nucleic acid sequences that promote Rho-dependent termination remain poorly characterized. Defining the molecular determinants that confer Rho-dependent termination is especially important for understanding how such terminators can be regulated in response to specific signals. Here, we identify an extraordinarily long-lived pause at the site where Rho terminates transcription in the 5'-leader region of the Mg(2+) transporter gene mgtA in Salmonella enterica. We dissect the sequence elements required for prolonged pausing in the mgtA leader and establish that the remarkable longevity of this pause is required for a riboswitch to stimulate Rho-dependent termination in the mgtA leader region in response to Mg(2+) availability. Unlike Rho-dependent terminators described previously, where termination occurs at multiple pause sites, there is a single site of transcription termination directed by Rho in the mgtA leader. Our data suggest that Rho-dependent termination events that are subject to regulation may require elements distinct from those operating at constitutive Rho-dependent terminators.

  7. 76 FR 7482 - Operations Specifications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-10

    ...] RIN 2120-AJ45 Operations Specifications AGENCY: Federal Aviation Administration (FAA), DOT. ACTION... carriers and foreign persons for part 129 operations specifications and establishes new standards for amendment, suspension, and termination of those operations specifications. In addition, the FAA has moved...

  8. 75 FR 22151 - National Maritime Security Advisory Committee; Vacancies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... field are encouraged to apply: Port Operations Management/Port Authorities. Maritime Security Operations and Training. Marine Salvage Operations. Maritime Security Related Academics/Public Policy. Marine Facilities and Terminals Security Management. Vessel Owners/Operators. Maritime Labor. International and...

  9. Light microscopic image analysis system to quantify immunoreactive terminal area apposed to nerve cells.

    PubMed

    Wu, L C; D'Amelio, F; Fox, R A; Polyakov, I; Daunton, N G

    1997-06-06

    The present report describes a desktop computer-based method for the quantitative assessment of the area occupied by immunoreactive terminals in close apposition to nerve cells in relation to the perimeter of the cell soma. This method is based on Fast Fourier Transform (FFT) routines incorporated in NIH-Image public domain software. Pyramidal cells of layer V of the somatosensory cortex outlined by GABA immunolabeled terminals were chosen for our analysis. A Leitz Diaplan light microscope was employed for the visualization of the sections. A Sierra Scientific Model 4030 CCD camera was used to capture the images into a Macintosh Centris 650 computer. After preprocessing, filtering was performed on the power spectrum in the frequency domain produced by the FFT operation. An inverse FFT with filter procedure was employed to restore the images to the spatial domain. Pasting of the original image to the transformed one using a Boolean logic operation called 'AND'ing produced an image with the terminals enhanced. This procedure allowed the creation of a binary image using a well-defined threshold of 128. Thus, the terminal area appears in black against a white background. This methodology provides an objective means of measurement of area by counting the total number of pixels occupied by immunoreactive terminals in light microscopic sections in which the difficulties of labeling intensity, size, shape and numerical density of terminals are avoided.

  10. CRYSNET manual. Informal report. [Hardware and software of crystallographic computing network

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None,

    1976-07-01

    This manual describes the hardware and software which together make up the crystallographic computing network (CRYSNET). The manual is intended as a users' guide and also provides general information for persons without any experience with the system. CRYSNET is a network of intelligent remote graphics terminals that are used to communicate with the CDC Cyber 70/76 computing system at the Brookhaven National Laboratory (BNL) Central Scientific Computing Facility. Terminals are in active use by four research groups in the field of crystallography. A protein data bank has been established at BNL to store in machine-readable form atomic coordinates and othermore » crystallographic data for macromolecules. The bank currently includes data for more than 20 proteins. This structural information can be accessed at BNL directly by the CRYSNET graphics terminals. More than two years of experience has been accumulated with CRYSNET. During this period, it has been demonstrated that the terminals, which provide access to a large, fast third-generation computer, plus stand-alone interactive graphics capability, are useful for computations in crystallography, and in a variety of other applications as well. The terminal hardware, the actual operations of the terminals, and the operations of the BNL Central Facility are described in some detail, and documentation of the terminal and central-site software is given. (RWR)« less

  11. Light microscopic image analysis system to quantify immunoreactive terminal area apposed to nerve cells

    NASA Technical Reports Server (NTRS)

    Wu, L. C.; D'Amelio, F.; Fox, R. A.; Polyakov, I.; Daunton, N. G.

    1997-01-01

    The present report describes a desktop computer-based method for the quantitative assessment of the area occupied by immunoreactive terminals in close apposition to nerve cells in relation to the perimeter of the cell soma. This method is based on Fast Fourier Transform (FFT) routines incorporated in NIH-Image public domain software. Pyramidal cells of layer V of the somatosensory cortex outlined by GABA immunolabeled terminals were chosen for our analysis. A Leitz Diaplan light microscope was employed for the visualization of the sections. A Sierra Scientific Model 4030 CCD camera was used to capture the images into a Macintosh Centris 650 computer. After preprocessing, filtering was performed on the power spectrum in the frequency domain produced by the FFT operation. An inverse FFT with filter procedure was employed to restore the images to the spatial domain. Pasting of the original image to the transformed one using a Boolean logic operation called 'AND'ing produced an image with the terminals enhanced. This procedure allowed the creation of a binary image using a well-defined threshold of 128. Thus, the terminal area appears in black against a white background. This methodology provides an objective means of measurement of area by counting the total number of pixels occupied by immunoreactive terminals in light microscopic sections in which the difficulties of labeling intensity, size, shape and numerical density of terminals are avoided.

  12. The C terminus of Ku80 activates the DNA-dependent protein kinase catalytic subunit.

    PubMed

    Singleton, B K; Torres-Arzayus, M I; Rottinghaus, S T; Taccioli, G E; Jeggo, P A

    1999-05-01

    Ku is a heterodimeric protein with double-stranded DNA end-binding activity that operates in the process of nonhomologous end joining. Ku is thought to target the DNA-dependent protein kinase (DNA-PK) complex to the DNA and, when DNA bound, can interact and activate the DNA-PK catalytic subunit (DNA-PKcs). We have carried out a 3' deletion analysis of Ku80, the larger subunit of Ku, and shown that the C-terminal 178 amino acid residues are dispensable for DNA end-binding activity but are required for efficient interaction of Ku with DNA-PKcs. Cells expressing Ku80 proteins that lack the terminal 178 residues have low DNA-PK activity, are radiation sensitive, and can recombine the signal junctions but not the coding junctions during V(D)J recombination. These cells have therefore acquired the phenotype of mouse SCID cells despite expressing DNA-PKcs protein, suggesting that an interaction between DNA-PKcs and Ku, involving the C-terminal region of Ku80, is required for DNA double-strand break rejoining and coding but not signal joint formation. To gain further insight into important domains in Ku80, we report a point mutational change in Ku80 in the defective xrs-2 cell line. This residue is conserved among species and lies outside of the previously reported Ku70-Ku80 interaction domain. The mutational change nonetheless abrogates the Ku70-Ku80 interaction and DNA end-binding activity.

  13. Practical color vision tests for air traffic control applicants: en route center and terminal facilities.

    PubMed

    Mertens, H W; Milburn, N J; Collins, W E

    2000-12-01

    Two practical color vision tests were developed and validated for use in screening Air Traffic Control Specialist (ATCS) applicants for work at en route center or terminal facilities. The development of the tests involved careful reproduction/simulation of color-coded materials from the most demanding, safety-critical color task performed in each type of facility. The tests were evaluated using 106 subjects with normal color vision and 85 with color vision deficiency. The en route center test, named the Flight Progress Strips Test (FPST), required the identification of critical red/black coding in computer printing and handwriting on flight progress strips. The terminal option test, named the Aviation Lights Test (ALT), simulated red/green/white aircraft lights that must be identified in night ATC tower operations. Color-coding is a non-redundant source of safety-critical information in both tasks. The FPST was validated by direct comparison of responses to strip reproductions with responses to the original flight progress strips and a set of strips selected independently. Validity was high; Kappa = 0.91 with original strips as the validation criterion and 0.86 with different strips. The light point stimuli of the ALT were validated physically with a spectroradiometer. The reliabilities of the FPST and ALT were estimated with Chronbach's alpha as 0.93 and 0.98, respectively. The high job-relevance, validity, and reliability of these tests increases the effectiveness and fairness of ATCS color vision testing.

  14. Crew aiding and automation: A system concept for terminal area operations, and guidelines for automation design

    NASA Technical Reports Server (NTRS)

    Dwyer, John P.

    1994-01-01

    This research and development program comprised two efforts: the development of guidelines for the design of automated systems, with particular emphasis on automation design that takes advantage of contextual information, and the concept-level design of a crew aiding system, the Terminal Area Navigation Decision Aiding Mediator (TANDAM). This concept outlines a system capable of organizing navigation and communication information and assisting the crew in executing the operations required in descent and approach. In service of this endeavor, problem definition activities were conducted that identified terminal area navigation and operational familiarization exercises addressing the terminal area navigation problem. Both airborne and ground-based (ATC) elements of aircraft control were extensively researched. The TANDAM system concept was then specified, and the crew interface and associated systems described. Additionally, three descent and approach scenarios were devised in order to illustrate the principal functions of the TANDAM system concept in relation to the crew, the aircraft, and ATC. A plan for the evaluation of the TANDAM system was established. The guidelines were developed based on reviews of relevant literature, and on experience gained in the design effort.

  15. Bidirectional buck boost converter

    DOEpatents

    Esser, Albert Andreas Maria

    1998-03-31

    A bidirectional buck boost converter and method of operating the same allows regulation of power flow between first and second voltage sources in which the voltage level at each source is subject to change and power flow is independent of relative voltage levels. In one embodiment, the converter is designed for hard switching while another embodiment implements soft switching of the switching devices. In both embodiments, first and second switching devices are serially coupled between a relatively positive terminal and a relatively negative terminal of a first voltage source with third and fourth switching devices serially coupled between a relatively positive terminal and a relatively negative terminal of a second voltage source. A free-wheeling diode is coupled, respectively, in parallel opposition with respective ones of the switching devices. An inductor is coupled between a junction of the first and second switching devices and a junction of the third and fourth switching devices. Gating pulses supplied by a gating circuit selectively enable operation of the switching devices for transferring power between the voltage sources. In the second embodiment, each switching device is shunted by a capacitor and the switching devices are operated when voltage across the device is substantially zero.

  16. Bidirectional buck boost converter

    DOEpatents

    Esser, A.A.M.

    1998-03-31

    A bidirectional buck boost converter and method of operating the same allows regulation of power flow between first and second voltage sources in which the voltage level at each source is subject to change and power flow is independent of relative voltage levels. In one embodiment, the converter is designed for hard switching while another embodiment implements soft switching of the switching devices. In both embodiments, first and second switching devices are serially coupled between a relatively positive terminal and a relatively negative terminal of a first voltage source with third and fourth switching devices serially coupled between a relatively positive terminal and a relatively negative terminal of a second voltage source. A free-wheeling diode is coupled, respectively, in parallel opposition with respective ones of the switching devices. An inductor is coupled between a junction of the first and second switching devices and a junction of the third and fourth switching devices. Gating pulses supplied by a gating circuit selectively enable operation of the switching devices for transferring power between the voltage sources. In the second embodiment, each switching device is shunted by a capacitor and the switching devices are operated when voltage across the device is substantially zero. 20 figs.

  17. Triple Play over Satellite, Ka-Band Making the Difference

    NASA Astrophysics Data System (ADS)

    Benoit, Guillaume; Fenech, Hector; Pezzana, Stefano

    Over the last years a number of operators have been deploying satellite-based consumer internet access services to reduce the digital divide and capture the market of households not covered by ADSL, cable or wireless broadband. These operators are proposing a step change improvement in the economics of consumer service, with lower terminal costs, broadband access with monthly fees comparable to ADSL and an integrated technology simplifying the process of terminal installation, provisioning and management.

  18. Ka-band Technologies for Small Spacecraft Communications via Relays and Direct Data Downlink

    NASA Technical Reports Server (NTRS)

    Budinger, James M.; Niederhaus, Charles; Reinhart, Richard; Downey, Joe; Roberts, Anthony

    2016-01-01

    As the scientific capabilities and number of small spacecraft missions in the near Earth region increase, standard yet configurable user spacecraft terminals operating in Ka-band are needed to lower mission cost and risk and enable significantly higher data return than current UHF or S-band terminals. These compact Ka-band terminals are intended to operate with both the current and next generation of Ka-band relay satellites and via direct data communications with near Earth tracking terminals. This presentation provides an overview of emerging NASA-sponsored and commercially provided technologies in software defined radios (SDRs), transceivers, and electronically steered antennas that will enable data rates from hundreds of kbps to over 1 Gbps and operate in multiple frequency bands (such as S- and X-bands) and expand the use of NASA's common Ka-bands frequencies: 22.55-23.15 GHz for forward data or uplink; and 25.5-27.0 GHz for return data or downlink. Reductions in mass, power and volume come from integration of multiple radio functions, operations in Ka-band, high efficiency amplifiers and receivers, and compact, flat and vibration free electronically steered narrow beam antennas for up to + 60 degrees field of regard. The software defined near Earth space transceiver (SD-NEST) described in the presentation is intended to be compliant with NASA's space telecommunications radio system (STRS) standard for communications waveforms and hardware interoperability.

  19. Evaluation of touch-sensitive screen tablet terminal button size and spacing accounting for effect of fingertip contact angle.

    PubMed

    Nishimura, T; Doi, K; Fujimoto, H

    2015-08-01

    Touch-sensitive screen terminals enabling intuitive operation are used as input interfaces in a wide range of fields. Tablet terminals are one of the most common devices with a touch-sensitive screen. They have a feature of good portability, enabling use under various conditions. On the other hand, they require a GUI designed to prevent decrease of usability under various conditions. For example, the angle of fingertip contact with the display changes according to finger posture during operation and how the case is held. When a human fingertip makes contact with an object, the contact area between the fingertip and contact object increases or decreases as the contact angle changes. A touch-sensitive screen detects positions using the change in capacitance of the area touched by the fingertip; hence, differences in contact area between the touch-sensitive screen and fingertip resulting from different forefinger angles during operation could possibly affect operability. However, this effect has never been studied. We therefore conducted an experiment to investigate the relationship between size/spacing and operability, while taking the effect of fingertip contact angle into account. As a result, we have been able to specify the button size and spacing conditions that enable accurate and fast operation regardless of the forefinger contact angle.

  20. Structural characterization of alpha-terminal group of natural rubber. 2. Decomposition of branch-points by phospholipase and chemical treatments.

    PubMed

    Tarachiwin, Lucksanaporn; Sakdapipanich, Jitladda; Ute, Koichi; Kitayama, Tatsuki; Tanaka, Yasuyuki

    2005-01-01

    The treatment of deproteinized natural rubber (DPNR) latex with phospholipases A(2), B, C, and D decreased significantly the long-chain fatty acid ester contents in DPNR and also the molecular weight and Higgins' k' constant, except for phospholipase D treatment. This indicates the presence of phospholipid molecules in NR, which combine rubber molecules together. Transesterification of DPNR resulted in the decomposition of the functional group at the terminal chain-end (alpha-terminal), including phospholipids and formed linear rubber molecules. The addition of small amounts of ethanol into the DPNR solution reduced the molecular weight and shifted the molecular weight distribution (MWD) comparable to that of transesterified DPNR (TE-DPNR). The addition of diammonium hydrogen phosphate into DPNR-latex in order to remove Mg2+ ions yielded a slight decrease in molecular weight and a slight shift in MWD. The phospholipids are expected to link with mono- and diphosphate groups at the alpha-terminal by hydrogen bonding and/or ionic linkages. The decrease in the molecular weight and Huggins' k' constant of DPNR demonstrates the formation of linear molecules after decomposition of branch-points by this treatment, showing that phospholipids participate in the branching formation of NR. The branch-points formed at the alpha-terminus are postulated to originate predominantly by the association of phospholipids via micelle formation of long-chain fatty acid esters and hydrogen bonding between polar headgroups of phospholipids.

  1. Comprehensive representation of the Lennard-Jones equation of state based on molecular dynamics simulation data

    NASA Astrophysics Data System (ADS)

    Pieprzyk, S.; Brańka, A. C.; Maćkowiak, Sz.; Heyes, D. M.

    2018-03-01

    The equation of state (EoS) of the Lennard-Jones fluid is calculated using a new set of molecular dynamics data which extends to higher temperature than in previous studies. The modified Benedict-Webb-Rubin (MBWR) equation, which goes up to ca. T ˜ 6, is reparametrized with new simulation data. A new analytic form for the EoS, which breaks the fluid range into two regions with different analytic forms and goes up to ca. T ≃ 35, is also proposed. The accuracy of the new formulas is at least as good as the MBWR fit and goes to much higher temperature allowing it to now encompass the Amagat line. The fitted formula extends into the high temperature range where the system can be well represented by inverse power potential scaling, which means that our specification of the equation of state covers the entire (ρ, T) plane. Accurate analytic fit formulas for the Boyle, Amagat, and inversion curves are presented. Parametrizations of the extrema loci of the isochoric, CV, and isobaric, CP, heat capacities are given. As found by others, a line maxima of CP terminates in the critical point region, and a line of minima of CP terminates on the freezing line. The line of maxima of CV terminates close to or at the critical point, and a line of minima of CV terminates to the right of the critical point. No evidence for a divergence in CV in the critical region is found.

  2. Gas tube-switched high voltage DC power converter

    DOEpatents

    She, Xu; Bray, James William; Sommerer, Timothy John; Chokhawala, Rahul

    2018-05-15

    A direct current (DC)-DC converter includes a transformer and a gas tube-switched inverter circuit. The transformer includes a primary winding and a secondary winding. The gas tube-switched inverter circuit includes first and second inverter load terminals and first and second inverter input terminals. The first and second inverter load terminals are coupled to the primary winding. The first and second inverter input terminals are couplable to a DC node. The gas tube-switched inverter circuit further includes a plurality of gas tube switches respectively coupled between the first and second inverter load terminals and the first and second inverter input terminals. The plurality of gas tube switches is configured to operate to generate an alternating current (AC) voltage at the primary winding.

  3. Long-range synchrony and emergence of neural reentry

    NASA Astrophysics Data System (ADS)

    Keren, Hanna; Marom, Shimon

    2016-11-01

    Neural synchronization across long distances is a functionally important phenomenon in health and disease. In order to access the basis of different modes of long-range synchrony, we monitor spiking activities over centimetre scale in cortical networks and show that the mode of synchrony depends upon a length scale, λ, which is the minimal path that activity should propagate through to find its point of origin ready for reactivation. When λ is larger than the physical dimension of the network, distant neuronal populations operate synchronously, giving rise to irregularly occurring network-wide events that last hundreds of milliseconds to several seconds. In contrast, when λ approaches the dimension of the network, a continuous self-sustained reentry propagation emerges, a regular seizure-like mode that is marked by precise spatiotemporal patterns (‘synfire chains’) and may last many minutes. Termination of a reentry phase is preceded by a decrease of propagation speed to a halt. Stimulation decreases both propagation speed and λ values, which modifies the synchrony mode respectively. The results contribute to the understanding of the origin and termination of different modes of neural synchrony as well as their long-range spatial patterns, while hopefully catering to manipulation of the phenomena in pathological conditions.

  4. 29 CFR 1917.27 - Personnel.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Personnel. 1917.27 Section 1917.27 Labor Regulations...) MARINE TERMINALS Marine Terminal Operations § 1917.27 Personnel. (a) Qualifications of machinery...) elements of accident prevention; (iii) attitudes, leadership and motivation; (iv) hazards of longshoring...

  5. Control of nonlinear systems using terminal sliding modes

    NASA Technical Reports Server (NTRS)

    Venkataraman, S. T.; Gulati, S.

    1992-01-01

    The development of an approach to control synthesis for robust robot operations in unstructured environments is discussed. To enhance control performance with full model information, the authors introduce the notion of terminal convergence and develop control laws based on a class of sliding modes, denoted as terminal sliders. They demonstrate that terminal sliders provide robustness to parametric uncertainty without having to resort to high-frequency control switching, as in the case of conventional sliders. It is shown that the proposed method leads to greater guaranteed precision in all control cases discussed.

  6. Teamwork in the Terminal Area: Organizational Issues and Solutions

    NASA Technical Reports Server (NTRS)

    Parke, Bonny K.; Kanki, Barbara G.; Rosekind, Mark (Technical Monitor)

    1997-01-01

    Dynamic growth and technology advances in commercial aviation have turned the terminal area into a complex, multi-organization workplace which requires the smooth coordination of many operational teams. In addition to pilots, cabin crew, air traffic controllers, and dispatch (who nominally work together throughout a flight), surface operations additionally involve local, ground and ramp controllers, ramp agents, maintenance, dozens of service contractors, and any number of teams who are responsible for airport operations. Under abnormal or emergency conditions, even more teams become actively involved. In order to accommodate growth and to meet productivity and safety challenges, numerous changes are being made in surface operations. Unfortunately, it is often the case that changes in technologies, organizational roles, procedures, and training are developed and implemented in isolated and piecemeal fashion without regard to cross organizational impact. Thus, there is a need for evaluation methodologies which assure integrated system safety for all organizations. Such methodologies should aid the understanding of how organizations work together and how changes in one domain affects the next. In this study, we develop one approach toward addressing these organizational issues. Examples of surface operations in abnormal situations are examined in regard to their impact on personnel in the terminal area. Timelines are given for the responses to incidents, along with the necessary communication links, the specific roles that members of terminal teams have, and any overlapping responsibilities. Suggestions to improve cross-operational teamwork are given. Methods of graphic representation are explored, both in regards to human links and access to information. The outcome of such an approach should enhance the understanding which is critical for resolving organizational conflicts and maximizing system effectiveness.

  7. Enhanced Flight Termination System (EFTS): Flight Demonstration and Results

    NASA Technical Reports Server (NTRS)

    Tow, David; Arce, Dennis

    2008-01-01

    The Enhanced Flight Termination System (EFTS) program was initiated and propelled due to the inadvertent terminations of Global Hawk and the Strategic Target System and the NASA Inspector General's assessment letter and recommendations regarding the exploration of low-cost, lightweight space COMSEC for FTS. Additionally, the standard analog and high alphabet systems most commonly used in FTS are secure, but not encrypted. A study group was initiated to select and document a robust, affordable, reliable technology that provides encrypted FTS capability. A flight demonstration was conducted to gain experience using EFTS in an operational environment, provide confidence in the use of the EFTS components, integrate EFTS into an existing range infrastructure to demonstrate the scalability of system components, to provide a command controller that generated the EFTS waveform using an existing range infrastructure, and to provide a report documenting the results of the demonstration. The primary goal of the demonstration was to obtain operational experience with EFTS. Areas of operational experience include: mission planning, pre-flight configuration and testing, mission monitoring and recording, vehicle termination, developing mission procedures. and post mission data reduction and other post mission activities. An Advanced Medium-Range Air-to-Air Missile (AMRAAM) was selected to support the EFTS demonstration due to interest in future use of EFTS by the AMRAAM program, familiarity of EFTS by range personnel, and the availability of existing operational environment to support EFTS testing with available program funding. For demonstration purposes, the AMRAAM was successfully terminated using an EFTS receiver and successfully demonstrating EFTS. The EFTS monitoring software with spectrum analyzer and digital graphical display of aircraft, missile, and target were also demonstrated.

  8. M/A-COM Linkabit Eastern Operations

    DTIC Science & Technology

    1983-03-31

    Lincoln Laboratories speech codec for use in multimedia system development. Communication equipment included 1200-bps dial-up modems and a set of...connected to the DCN for use in[7, Page 4 general word-processing and network-testing applications.Additional modems and video terminals have also been...line 0) can be connected to a second terminal, a printer, or a modem . The standard configuration assumes this line is connected to a terminal or

  9. Prototype data terminal: Multiplexer/demultiplexer

    NASA Technical Reports Server (NTRS)

    Leck, D. E.; Goodwin, J. E.

    1972-01-01

    The design and operation of a quad redundant data terminal and a multiplexer/demultiplexer (MDU) design are described. The most unique feature is the design of the quad redundant data terminal. This is one of the few designs where the unit is fail/op, fail/op, fail/safe. Laboratory tests confirm that the unit will operate satisfactorily with the failure of three out of four channels. Although the design utilizes state-of-the-art technology. The waveform error checks, the voting techniques, and the parity bit checks are believed to be used in unique configurations. Correct word selection routines are also novel, if not unique. The MDU design, while not redundant, utilizes, the latest state-of-the-art advantages of light couplers and integrated circuit amplifiers.

  10. Effects of Differential Reinforcement and Rules with Feedback on Preference for Choice and Verbal Reports

    ERIC Educational Resources Information Center

    Karsina, Allen; Thompson, Rachel H.; Rodriguez, Nicole M.; Vanselow, Nicholas R.

    2012-01-01

    We evaluated the effects of differential reinforcement and accurate verbal rules with feedback on the preference for choice and the verbal reports of 6 adults. Participants earned points on a probabilistic schedule by completing the terminal links of a concurrent-chains arrangement in a computer-based game of chance. In free-choice terminal links,…

  11. An approximate, maximum terminal velocity descent to a point

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eisler, G.R.; Hull, D.G.

    1987-01-01

    No closed form control solution exists for maximizing the terminal velocity of a hypersonic glider at an arbitrary point. As an alternative, this study uses neighboring extremal theory to provide a sampled data feedback law to guide the vehicle to a constrained ground range and altitude. The guidance algorithm is divided into two parts: 1) computation of a nominal, approximate, maximum terminal velocity trajectory to a constrained final altitude and computation of the resulting unconstrained groundrange, and 2) computation of the neighboring extremal control perturbation at the sample value of flight path angle to compensate for changes in the approximatemore » physical model and enable the vehicle to reach the on-board computed groundrange. The trajectories are characterized by glide and dive flight to the target to minimize the time spent in the denser parts of the atmosphere. The proposed on-line scheme successfully brings the final altitude and range constraints together, as well as compensates for differences in flight model, atmosphere, and aerodynamics at the expense of guidance update computation time. Comparison with an independent, parameter optimization solution for the terminal velocity is excellent. 6 refs., 3 figs.« less

  12. A comparison of 8.415-, 32.0- and 565646-GHz deep space telemetry links

    NASA Technical Reports Server (NTRS)

    Dickinson, R. M.

    1985-01-01

    An economic and performance comparison is made of spacecraft telecommunication links at 8.415, 32.0, and 565646 GHz (0.53-micron wavelength) for the return of 3.43 x 10 to the 11th power bits from a Saturn Orbiter/Titan Probe mission in year 2000. Technical performance and costs for both ends of the links are included. Spacecraft antenna or telescope efficiencies, pointing losses, ground-based or Earth-orbiting relay terminals efficiencies, noise temperatures, recurring and nonrecurring engineering, and maintenance and operations costs are modeled. Weather effects, dc-to-RF or laser power conversion efficiencies, gravity and other environment distortions gain reductions, and the cost of pointing and tracking are analyzed. The effort is focused primarily on the microwave frequency links. There are large uncertainties in the cost results, but conclusions indicate that for a mid-1990's launch, the Ka-band system is as cost effective as X-band. The Ka-band system has a data rate advantage as compared to the X-band system for the same dc power input to the spacecraft. The magnitude of the advantage is a complex function of the weather at the DSN stations and the elevation angle of the ground antenna. A simple numerical comparison of the advantage is difficult and curves are provided. The optical frequency link is more costly based on the launch-to-orbit costs for the orbiting terminal. A more detailed study of the optical system is recommended to quantify astrometric tracking benefits and improve the accuracy of the cost estimate.

  13. D Building FAÇADE Reconstruction Using Handheld Laser Scanning Data

    NASA Astrophysics Data System (ADS)

    Sadeghi, F.; Arefi, H.; Fallah, A.; Hahn, M.

    2015-12-01

    3D The three dimensional building modelling has been an interesting topic of research for decades and it seems that photogrammetry methods provide the only economic means to acquire truly 3D city data. According to the enormous developments of 3D building reconstruction with several applications such as navigation system, location based services and urban planning, the need to consider the semantic features (such as windows and doors) becomes more essential than ever, and therefore, a 3D model of buildings as block is not any more sufficient. To reconstruct the façade elements completely, we employed the high density point cloud data that obtained from the handheld laser scanner. The advantage of the handheld laser scanner with capability of direct acquisition of very dense 3D point clouds is that there is no need to derive three dimensional data from multi images using structure from motion techniques. This paper presents a grammar-based algorithm for façade reconstruction using handheld laser scanner data. The proposed method is a combination of bottom-up (data driven) and top-down (model driven) methods in which, at first the façade basic elements are extracted in a bottom-up way and then they are served as pre-knowledge for further processing to complete models especially in occluded and incomplete areas. The first step of data driven modelling is using the conditional RANSAC (RANdom SAmple Consensus) algorithm to detect façade plane in point cloud data and remove noisy objects like trees, pedestrians, traffic signs and poles. Then, the façade planes are divided into three depth layers to detect protrusion, indentation and wall points using density histogram. Due to an inappropriate reflection of laser beams from glasses, the windows appear like holes in point cloud data and therefore, can be distinguished and extracted easily from point cloud comparing to the other façade elements. Next step, is rasterizing the indentation layer that holds the windows and doors information. After rasterization process, the morphological operators are applied in order to remove small irrelevant objects. Next, the horizontal splitting lines are employed to determine floors and vertical splitting lines are employed to detect walls, windows, and doors. The windows, doors and walls elements which are named as terminals are clustered during classification process. Each terminal contains a special property as width. Among terminals, windows and doors are named the geometry tiles in definition of the vocabularies of grammar rules. Higher order structures that inferred by grouping the tiles resulted in the production rules. The rules with three dimensional modelled façade elements constitute formal grammar that is named façade grammar. This grammar holds all the information that is necessary to reconstruct façades in the style of the given building. Thus, it can be used to improve and complete façade reconstruction in areas with no or limited sensor data. Finally, a 3D reconstructed façade model is generated that the accuracy of its geometry size and geometry position depends on the density of the raw point cloud.

  14. Apparatus and method for detecting and measuring changes in linear relationships between a number of high frequency signals

    DOEpatents

    Bittner, J.W.; Biscardi, R.W.

    1991-03-19

    An electronic measurement circuit is disclosed for high speed comparison of the relative amplitudes of a predetermined number of electrical input signals independent of variations in the magnitude of the sum of the signals. The circuit includes a high speed electronic switch that is operably connected to receive on its respective input terminals one of said electrical input signals and to have its common terminal serve as an input for a variable-gain amplifier-detector circuit that is operably connected to feed its output to a common terminal of a second high speed electronic switch. The respective terminals of the second high speed electronic switch are operably connected to a plurality of integrating sample and hold circuits, which in turn have their outputs connected to a summing logic circuit that is operable to develop first, second and third output voltages, the first output voltage being proportional to a predetermined ratio of sums and differences between the compared input signals, the second output voltage being proportional to a second summed ratio of predetermined sums and differences between said input signals, and the third output voltage being proportional to the sum of signals to the summing logic circuit. A servo system that is operably connected to receive said third output signal and compare it with a reference voltage to develop a slowly varying feedback voltage to control the variable-gain amplifier in said common amplifier-detector circuit in order to make said first and second output signals independent of variations in the magnitude of the sum of said input signals. 2 figures.

  15. Apparatus and method for detecting and measuring changes in linear relationships between a number of high frequency signals

    DOEpatents

    Bittner, John W.; Biscardi, Richard W.

    1991-01-01

    An electronic measurement circuit for high speed comparison of the relative amplitudes of a predetermined number of electrical input signals independent of variations in the magnitude of the sum of the signals. The circuit includes a high speed electronic switch that is operably connected to receive on its respective input terminals one of said electrical input signals and to have its common terminal serve as an input for a variable-gain amplifier-detector circuit that is operably connected to feed its output to a common terminal of a second high speed electronic switch. The respective terminals of the second high speed electronic switch are operably connected to a plurality of integrating sample and hold circuits, which in turn have their outputs connected to a summing logic circuit that is operable to develop first, second and third output voltages, the first output voltage being proportional to a predetermined ratio of sums and differences between the compared input signals, the second output voltage being proportional to a second summed ratio of predetermined sums and differences between said input signals, and the third output voltage being proportional to the sum of signals to the summing logic circuit. A servo system that is operably connected to receive said third output signal and compare it with a reference voltage to develop a slowly varying feedback voltage to control the variable-gain amplifier in said common amplifier-detector circuit in order to make said first and second output signals independent of variations in the magnitude of the sum of said input signals.

  16. Use of Computer Simulation for the Analysis of Railroad Operations in the St. Louis Terminal Area

    DOT National Transportation Integrated Search

    1977-11-01

    This report discusses the computer simulation methodology, its uses and limitations, and its applicability to the analysis of alternative railroad terminal restructuring plans. Included is a detailed discussion of the AAR Simulation System, an overvi...

  17. Hazardous Waste Cleanup: Buckeye Caribbean Terminals Incorporated in Yabucoa, Puerto Rico

    EPA Pesticide Factsheets

    The Buckeye Caribbean Terminals, Inc. (formerly Shell Chemical Yabucoa, Inc.) is located on Road 901 about two miles east of the town of Yabucoa, Puerto Rico. Petroleum refining operations have been in progress at the site since May 1971.

  18. 14 CFR 93.51 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Anchorage, Alaska, Terminal Area § 93.51... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Applicability. 93.51 Section 93.51..., Terminal Area. [Doc. No. FAA-2002-13235, 68 FR 9795, Feb. 28, 2003] ...

  19. 14 CFR 93.51 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Anchorage, Alaska, Terminal Area § 93.51... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Applicability. 93.51 Section 93.51..., Terminal Area. [Doc. No. FAA-2002-13235, 68 FR 9795, Feb. 28, 2003] ...

  20. 14 CFR 93.51 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Anchorage, Alaska, Terminal Area § 93.51... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Applicability. 93.51 Section 93.51..., Terminal Area. [Doc. No. FAA-2002-13235, 68 FR 9795, Feb. 28, 2003] ...

  1. 14 CFR 93.51 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Anchorage, Alaska, Terminal Area § 93.51... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Applicability. 93.51 Section 93.51..., Terminal Area. [Doc. No. FAA-2002-13235, 68 FR 9795, Feb. 28, 2003] ...

  2. 14 CFR 93.51 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Anchorage, Alaska, Terminal Area § 93.51... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Applicability. 93.51 Section 93.51..., Terminal Area. [Doc. No. FAA-2002-13235, 68 FR 9795, Feb. 28, 2003] ...

  3. 10 CFR 76.66 - Expiration and termination of certificates.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 76.66 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS... diffusion plants and other activities authorized under the certificate. (c) If the Corporation does not... specified in the existing certificate, terminate operation of the gaseous diffusion plants. [59 FR 48960...

  4. 10 CFR 76.66 - Expiration and termination of certificates.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 76.66 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS... diffusion plants and other activities authorized under the certificate. (c) If the Corporation does not... specified in the existing certificate, terminate operation of the gaseous diffusion plants. [59 FR 48960...

  5. 10 CFR 76.66 - Expiration and termination of certificates.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 76.66 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS... diffusion plants and other activities authorized under the certificate. (c) If the Corporation does not... specified in the existing certificate, terminate operation of the gaseous diffusion plants. [59 FR 48960...

  6. 10 CFR 76.66 - Expiration and termination of certificates.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 76.66 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS... diffusion plants and other activities authorized under the certificate. (c) If the Corporation does not... specified in the existing certificate, terminate operation of the gaseous diffusion plants. [59 FR 48960...

  7. 10 CFR 76.66 - Expiration and termination of certificates.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 76.66 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS... diffusion plants and other activities authorized under the certificate. (c) If the Corporation does not... specified in the existing certificate, terminate operation of the gaseous diffusion plants. [59 FR 48960...

  8. A Systematic Approach to Terminal Training.

    ERIC Educational Resources Information Center

    Sheffield, John

    1980-01-01

    Describes the systematic approach used by the training department of the Canada Trust Company to develop a training program for operators of the new terminals for the online banking system to which the bank was converting, the Canadian On-Line Financial Information System (COFIS). (JD)

  9. 46 CFR 153.983 - Termination procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Termination procedures. 153.983 Section 153.983 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Operations Cargo Transfer Procedures...

  10. 46 CFR 153.983 - Termination procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Termination procedures. 153.983 Section 153.983 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Operations Cargo Transfer Procedures...

  11. 46 CFR 153.983 - Termination procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Termination procedures. 153.983 Section 153.983 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Operations Cargo Transfer Procedures...

  12. 46 CFR 153.983 - Termination procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Termination procedures. 153.983 Section 153.983 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Operations Cargo Transfer Procedures...

  13. 46 CFR 153.983 - Termination procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Termination procedures. 153.983 Section 153.983 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Operations Cargo Transfer Procedures...

  14. Flight Crew Survey Responses from the Interval Management (IM) Avionics Phase 2 Flight Test

    NASA Technical Reports Server (NTRS)

    Baxley, Brian T.; Swieringa, Kurt A.; Wilson, Sara R.; Roper, Roy D.; Hubbs, Clay E.; Goess, Paul A.; Shay, Richard F.

    2017-01-01

    The Interval Management (IM) Avionics Phase 2 flight test used three aircraft over a nineteen day period to operationally evaluate a prototype IM avionics. Quantitative data were collected on aircraft state data and IM spacing algorithm performance, and qualitative data were collected through end-of-scenario and end-of-day flight crew surveys. The majority of the IM operations met the performance goals established for spacing accuracy at the Achieve-by Point and the Planned Termination Point, however there were operations that did not meet goals for a variety of reasons. While the positive spacing accuracy results demonstrate the prototype IM avionics can contribute to the overall air traffic goal, critical issues were also identified that need to be addressed to enhance IM performance. The first category was those issues that impacted the conduct and results of the flight test, but are not part of the IM concept or procedures. These included the design of arrival and approach procedures was not ideal to support speed as the primary control mechanism, the ground-side of the Air Traffic Management Technology Demonstration (ATD-1) integrated concept of operations was not part of the flight test, and the high workload to manually enter the information required to conduct an IM operation. The second category was issues associated with the IM spacing algorithm or flight crew procedures. These issues include the high frequency of IM speed changes and reversals (accelerations), a mismatch between the deceleration rate used by the spacing algorithm and the actual aircraft performance, and some spacing error calculations were sensitive to normal operational variations in aircraft airspeed or altitude which triggered additional IM speed changes. Once the issues in these two categories are addressed, the future IM avionics should have considerable promise supporting the goals of improving system throughput and aircraft efficiency.

  15. Aircraft Safety and Operating Problems. [conference

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Results of NASA research in the field of aircraft safety and operating problems are discussed. Topics include: (1) terminal area operations, (2) flight dynamics and control; (3) ground operations; (4) atmospheric environment; (5) structures and materials; (6) powerplants; (7) noise; and (8) human factors engineering.

  16. Monitoring, safety systems for LNG and LPG operators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    True, W.R.

    Operators in Korea and Australia have chosen monitoring and control systems in recent contracts for LNG and LPG storage. Korea Gas Corp. (Kogas) has hired Whessoe Varec, Calais, to provide monitoring systems for four LNG storage tanks being built at Kogas` Inchon terminal. For Elgas Ltd., Port Botany, Australia, Whessoe Varec has already shipped a safety valve-shutdown system to a new LPG cavern-storage facility under construction. The paper describes the systems, terminal monitoring, dynamic approach to tank management, and meeting the growing demand for LPG.

  17. Local Area Networks: Part I.

    ERIC Educational Resources Information Center

    Dessy, Raymond E.

    1982-01-01

    Local area networks are common communication conduits allowing various terminals, computers, discs, printers, and other electronic devices to intercommunicate over short distances. Discusses the vocabulary of such networks including RS-232C point-to-point and IEEE-488 multidrop protocols; error detection; message packets; multiplexing; star, ring,…

  18. Unusually long-lived pause required for regulation of a Rho-dependent transcription terminator

    PubMed Central

    Hollands, Kerry; Sevostiyanova, Anastasia; Groisman, Eduardo A.

    2014-01-01

    Up to half of all transcription termination events in bacteria rely on the RNA-dependent helicase Rho. However, the nucleic acid sequences that promote Rho-dependent termination remain poorly characterized. Defining the molecular determinants that confer Rho-dependent termination is especially important for understanding how such terminators can be regulated in response to specific signals. Here, we identify an extraordinarily long-lived pause at the site where Rho terminates transcription in the 5′-leader region of the Mg2+ transporter gene mgtA in Salmonella enterica. We dissect the sequence elements required for prolonged pausing in the mgtA leader and establish that the remarkable longevity of this pause is required for a riboswitch to stimulate Rho-dependent termination in the mgtA leader region in response to Mg2+ availability. Unlike Rho-dependent terminators described previously, where termination occurs at multiple pause sites, there is a single site of transcription termination directed by Rho in the mgtA leader. Our data suggest that Rho-dependent termination events that are subject to regulation may require elements distinct from those operating at constitutive Rho-dependent terminators. PMID:24778260

  19. Libration Point Navigation Concepts Supporting Exploration Vision

    NASA Technical Reports Server (NTRS)

    Carpenter, J. Russell; Folta, David C.; Moreau, Michael C.; Gramling, Cheryl J.

    2004-01-01

    Farquhar described several libration point navigation concepts that would appear to support NASA s current exploration vision. One concept is a Lunar Relay Satellite operating in the vicinity of Earth-Moon L2, providing Earth-to-lunar far-side and long- range surface-to-surface navigation and communications capability. Reference [ 1] lists several advantages of such a system in comparison to a lunar orbiting relay satellite constellation. Among these are one or two vs. many satellites for coverage, simplified acquisition and tracking due to very low relative motion, much longer contact times, and simpler antenna pointing. An obvious additional advantage of such a system is that uninterrupted links to Earth avoid performing critical maneuvers "in the blind." Another concept described is the use of Earth-Moon L1 for lunar orbit rendezvous, rather than low lunar orbit as was done for Apollo. This rendezvous technique would avoid large plane change and high fuel cost associated with high latitude landing sites and long stay times. Earth-Moon L1 also offers unconstrained launch windows from the lunar surface. Farquhar claims this technique requires only slightly higher fuel cost than low lunar orbit rendezvous for short-stay equatorial landings. Farquhar also describes an Interplanetary Transportation System that would use libration points as terminals for an interplanetary shuttle. This approach would offer increased operational flexibility in terms of launch windows, rendezvous, aborts, etc. in comparison to elliptical orbit transfers. More recently, other works including Folta[3] and Howell[4] have shown that patching together unstable trajectories departing Earth-Moon libration points with stable trajectories approaching planetary libration points may also offer lower overall fuel costs than elliptical orbit transfers. Another concept Farquhar described was a Deep Space Relay at Earth-Moon IA and/or L5 that would serve as a high data rate optical navigation and communications relay satellite. The advantages in comparison to a geosynchronous relay are minimal Earth occultation, distance from large noise sources on Earth, easier pointing due to smaller relative velocity, and a large baseline for interferometry if both L4 and L5 are used.

  20. 47 CFR 15.240 - Operation in the band 433.5-434.5 MHz.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... commercial and industrial areas such as ports, rail terminals and warehouses. Two-way operation is permitted to interrogate and to load data into devices. Devices operated pursuant to the provisions of this...

  1. Criticality safety strategy and analysis summary for the fuel cycle facility electrorefiner at Argonne National Laboratory West

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mariani, R.D.; Benedict, R.W.; Lell, R.M.

    1996-05-01

    As part of the termination activities of Experimental Breeder Reactor II (EBR-II) at Argonne National Laboratory (ANL) West, the spent metallic fuel from EBR-II will be treated in the fuel cycle facility (FCF). A key component of the spent-fuel treatment process in the FCF is the electrorefiner (ER) in which the actinide metals are separated from the active metal fission products and the reactive bond sodium. In the electrorefining process, the metal fuel is anodically dissolved into a high-temperature molten salt, and refined uranium or uranium/plutonium products are deposited at cathodes. The criticality safety strategy and analysis for the ANLmore » West FCF ER is summarized. The FCF ER operations and processes formed the basis for evaluating criticality safety and control during actinide metal fuel refining. To show criticality safety for the FCF ER, the reference operating conditions for the ER had to be defined. Normal operating envelopes (NOEs) were then defined to bracket the important operating conditions. To keep the operating conditions within their NOEs, process controls were identified that can be used to regulate the actinide forms and content within the ER. A series of operational checks were developed for each operation that will verify the extent or success of an operation. The criticality analysis considered the ER operating conditions at their NOE values as the point of departure for credible and incredible failure modes. As a result of the analysis, FCF ER operations were found to be safe with respect to criticality.« less

  2. Driving errors of learner teens: frequency, nature and their association with practice.

    PubMed

    Durbin, Dennis R; Mirman, Jessica H; Curry, Allison E; Wang, Wenli; Fisher Thiel, Megan C; Schultheis, Maria; Winston, Flaura K

    2014-11-01

    Despite demonstrating basic vehicle operations skills sufficient to pass a state licensing test, novice teen drivers demonstrate several deficits in tactical driving skills during the first several months of independent driving. Improving our knowledge of the types of errors made by teen permit holders early in the learning process would assist in the development of novel approaches to driver training and resources for parent supervision. The purpose of the current analysis was to describe driving performance errors made by teens during the permit period, and to determine if there were differences in the frequency and type of errors made by teens: (1) in comparison to licensed, safe, and experienced adult drivers; (2) by teen and parent-supervisor characteristics; and (3) by teen-reported quantity of practice driving. Data for this analysis were combined from two studies: (1) the control group of teens in a randomized clinical trial evaluating an intervention to improve parent-supervised practice driving (n=89 parent-teen dyads) and (2) a sample of 37 adult drivers (mean age 44.2 years), recruited and screened as an experienced and competent reference standard in a validation study of an on-road driving assessment for teens (tODA). Three measures of performance: drive termination (i.e., the assessment was discontinued for safety reasons), safety-relevant critical errors, and vehicle operation errors were evaluated at the approximate mid-point (12 weeks) and end (24 weeks) of the learner phase. Differences in driver performance were compared using the Wilcoxon rank sum test for continuous variables and Pearson's Chi-square test for categorical variables. 10.4% of teens had their early assessment terminated for safety reasons and 15.4% had their late assessment terminated, compared to no adults. These teens reported substantially fewer behind the wheel practice hours compared with teens that did not have their assessments terminated: tODAearly (9.0 vs. 20.0, p<0.001) and tODAlate (19.0 vs. 58.3, p<0.001). With respect to critical driving errors, 55% of teens committed a total of 85 critical errors (range of 1-5 errors per driver) on the early tODA; by comparison, only one adult committed a critical error (p<0.001). On the late tODA, 54% of teens committed 67 critical errors (range of 1-8 errors per driver) compared with only one adult (p<0.001). No differences in teen or parent gender, parent/teen relationship type or parent prior experience teaching a teen to drive were observed between teens who committed a critical error on either route and teens that committed no critical errors. A borderline association between median teen-reported practice quantity and critical error commission was observed for the late tODA. The overall median proportion of vehicle operation errors for teens was higher than that of adults on both assessments, though median error proportions were less than 10% for both teens and adults. In comparison to a group of experienced adult drivers, a substantially higher proportion of learner teens committed safety-relevant critical driving errors at both time points of assessment. These findings, as well as the associations between practice quantity and the driving performance outcomes studied suggest that further research is needed to better understand how teens might effectively learn skills necessary for safe independent driving while they are still under supervised conditions. Copyright © 2014 Elsevier Ltd. All rights reserved.

  3. 19. DETAIL OF AIR FORCE WEATHER INFORMATION TERMINAL AND CHART ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. DETAIL OF AIR FORCE WEATHER INFORMATION TERMINAL AND CHART RECORDER LOCATED IMMEDIATELY NORTH OF CONSOLE IN PHOTOS A-15 THROUGH A-18. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  4. 29 CFR 1917.17 - Railroad facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Railroad facilities. 1917.17 Section 1917.17 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.17 Railroad facilities. (a) Work shall be...

  5. 47 CFR 80.959 - Radiotelephone transmitter.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... watts into 50 ohms nominal resistance when operated with its rated supply voltage. The transmitter must... capability of the transmitter, measurements of primary supply voltage and transmitter output power must be... voltage measured at the power input terminals to the transmitter terminated in a matching artificial load...

  6. 46 CFR Sec. 3 - Terminal operating contract.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... _________, 19__, between the United States of America (herein called the “United States”), acting by and through...'s work under the provisions of this agreement the following: (1) For terminal services, an amount... first above written. (Seal) Attest: united states of america, department of transportation, maritime...

  7. 46 CFR Sec. 3 - Terminal operating contract.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... _________, 19__, between the United States of America (herein called the “United States”), acting by and through...'s work under the provisions of this agreement the following: (1) For terminal services, an amount... first above written. (Seal) Attest: united states of america, department of transportation, maritime...

  8. Method to Select Technical Terms for Glossaries in Support of Joint Task Force Operations

    DTIC Science & Technology

    2012-01-01

    have been prohibitively time-consuming. Instead, we identified two publicly available terminology extractor tools: TerMine (NaCTEM, 2011) and Alchemy ...and that from the latter, by high recall. The Alchemy approach contrasts with that used in TerMine in that Alchemy will process the text with...information categories, such as person, location, and organization, in addition to returning topic keywords. Output from both TerMine and Alchemy

  9. Termination or Transition: A 21st Century Perspective on the Military’s Role in Conflict Resolution

    DTIC Science & Technology

    2009-05-01

    Director, Robert F. Baumann, Ph.D. Graduate Degree Programs iii Abstract TRANSITION OR TERMINATION: A 21 ST CENTURY...1992) and James Raymer , In Search of Lasting Results: Military War Termination Doctrine (Fort Leavenworth, KS: US Army Command and General Staff... Robert E. Baumann, and John T. Fishel, Invasion, Intervention, and “Intervasion”: A Concise History of the US Army in Operation Uphold Democracy

  10. Microprocessor, Setx, Xrn2, and Rrp6 co-operate to induce premature termination of transcription by RNAPII.

    PubMed

    Wagschal, Alexandre; Rousset, Emilie; Basavarajaiah, Poornima; Contreras, Xavier; Harwig, Alex; Laurent-Chabalier, Sabine; Nakamura, Mirai; Chen, Xin; Zhang, Ke; Meziane, Oussama; Boyer, Frédéric; Parrinello, Hugues; Berkhout, Ben; Terzian, Christophe; Benkirane, Monsef; Kiernan, Rosemary

    2012-09-14

    Transcription elongation is increasingly recognized as an important mechanism of gene regulation. Here, we show that microprocessor controls gene expression in an RNAi-independent manner. Microprocessor orchestrates the recruitment of termination factors Setx and Xrn2, and the 3'-5' exoribonuclease, Rrp6, to initiate RNAPII pausing and premature termination at the HIV-1 promoter through cleavage of the stem-loop RNA, TAR. Rrp6 further processes the cleavage product, which generates a small RNA that is required to mediate potent transcriptional repression and chromatin remodeling at the HIV-1 promoter. Using chromatin immunoprecipitation coupled to high-throughput sequencing (ChIP-seq), we identified cellular gene targets whose transcription is modulated by microprocessor. Our study reveals RNAPII pausing and premature termination mediated by the co-operative activity of ribonucleases, Drosha/Dgcr8, Xrn2, and Rrp6, as a regulatory mechanism of RNAPII-dependent transcription elongation. Copyright © 2012 Elsevier Inc. All rights reserved.

  11. ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.; Struharik, Steven J.; Diamond, John J.; Stewart, David

    2000-01-01

    The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with ACTS. The ACTS experiments program proposed to validate Ka-band satellite and ground-station technology, demonstrate future telecommunication services, demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals and the lessons learned throughout their 6-year operation, including the inclined orbit phase-of-operations. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector-based offset-fed antenna systems with antennas ranging in size from 0.35 to 3.4 in. in diameter. Gateway earth stations included two systems referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET).

  12. Research In Nonlinear Flight Control for Tiltrotor Aircraft Operating in the Terminal Area

    NASA Technical Reports Server (NTRS)

    Calise, A. J.; Rysdyk, R.

    1996-01-01

    The research during the first year of the effort focused on the implementation of the recently developed combination of neural net work adaptive control and feedback linearization. At the core of this research is the comprehensive simulation code Generic Tiltrotor Simulator (GTRS) of the XV-15 tilt rotor aircraft. For this research the GTRS code has been ported to a Fortran environment for use on PC. The emphasis of the research is on terminal area approach procedures, including conversion from aircraft to helicopter configuration. This report focuses on the longitudinal control which is the more challenging case for augmentation. Therefore, an attitude command attitude hold (ACAH) control augmentation is considered which is typically used for the pitch channel during approach procedures. To evaluate the performance of the neural network adaptive control architecture it was necessary to develop a set of low order pilot models capable of performing such tasks as, follow desired altitude profiles, follow desired speed profiles, operate on both sides of powercurve, convert, including flaps as well as mastangle changes, operate with different stability and control augmentation system (SCAS) modes. The pilot models are divided in two sets, one for the backside of the powercurve and one for the frontside. These two sets are linearly blended with speed. The mastangle is also scheduled with speed. Different aspects of the proposed architecture for the neural network (NNW) augmented model inversion were also demonstrated. The demonstration involved implementation of a NNW architecture using linearized models from GTRS, including rotor states, to represent the XV-15 at various operating points. The dynamics used for the model inversion were based on the XV-15 operating at 30 Kts, with residualized rotor dynamics, and not including cross coupling between translational and rotational states. The neural network demonstrated ACAH control under various circumstances. Future efforts will include the implementation into the Fortran environment of GTRS, including pilot modeling and NNW augmentation for the lateral channels. These efforts should lead to the development of architectures that will provide for fully automated approach, using similar strategies.

  13. 14 CFR 417.309 - Flight safety system analysis.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... system anomaly occurring and all of its effects as determined by the single failure point analysis and... termination system. (c) Single failure point. A command control system must undergo an analysis that... fault tree analysis or a failure modes effects and criticality analysis; (2) Identify all possible...

  14. 14 CFR 417.309 - Flight safety system analysis.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... system anomaly occurring and all of its effects as determined by the single failure point analysis and... termination system. (c) Single failure point. A command control system must undergo an analysis that... fault tree analysis or a failure modes effects and criticality analysis; (2) Identify all possible...

  15. 14 CFR 417.309 - Flight safety system analysis.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... system anomaly occurring and all of its effects as determined by the single failure point analysis and... termination system. (c) Single failure point. A command control system must undergo an analysis that... fault tree analysis or a failure modes effects and criticality analysis; (2) Identify all possible...

  16. 14 CFR 417.309 - Flight safety system analysis.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... system anomaly occurring and all of its effects as determined by the single failure point analysis and... termination system. (c) Single failure point. A command control system must undergo an analysis that... fault tree analysis or a failure modes effects and criticality analysis; (2) Identify all possible...

  17. 14 CFR 417.309 - Flight safety system analysis.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... system anomaly occurring and all of its effects as determined by the single failure point analysis and... termination system. (c) Single failure point. A command control system must undergo an analysis that... fault tree analysis or a failure modes effects and criticality analysis; (2) Identify all possible...

  18. Operation and evaluation of the Terminal Configured Vehicle Mission Simulator in an automated terminal area metering and spacing ATC environment

    NASA Technical Reports Server (NTRS)

    Houck, J. A.

    1980-01-01

    This paper describes the work being done at the National Aeronautics and Space Administration's Langley Research Center on the development of a mission simulator for use in the Terminal Configured Vehicle Program. A brief description of the goals and objectives of the Terminal Configured Vehicle Program is presented. A more detailed description of the Mission Simulator, in its present configuration, and its components is provided. Finally, a description of the first research study conducted in the Mission Simulator is presented along with a discussion of some preliminary results from this study.

  19. The Valec fireball and predicted meteorite fall

    NASA Technical Reports Server (NTRS)

    Ceplecha, Z.; Spurny, P.

    1987-01-01

    A fireball was photographed with a luminous trajectory below a height of 20 km. On Aug. 3, 1984, seven stations photographed this slow moving fireball, which traversed 94 km of luminous trajectory in 9.2 sec and terminated its visible flight at a height of 19.1 km. The computed dark flight trajectory intersected the surface close to Valec, a small village 40 km west of Brno. The Valec fireball was the lowest photographed fireball ever. The Valec fireball was photographed by fish eye cameras. The positional precision of all the records were within the range of 1 to 2 minutes of arc. All computations were done using the FIRBAL program, a set of almost 4000 Fortran statements run on EC 1040 computer. The average computed mass at the terminal point, i.e., the predicted mass of the biggest meteorite, was 16 kg. This number is based on the dynamical data at the terminal point solely. Visual data was also collected from occasional observers. This observed phenomenon is discussed.

  20. Optimizations on supply and distribution of dissolved oxygen in constructed wetlands: A review.

    PubMed

    Liu, Huaqing; Hu, Zhen; Zhang, Jian; Ngo, Huu Hao; Guo, Wenshan; Liang, Shuang; Fan, Jinlin; Lu, Shaoyong; Wu, Haiming

    2016-08-01

    Dissolved oxygen (DO) is one of the most important factors that can influence pollutants removal in constructed wetlands (CWs). However, problems of insufficient oxygen supply and inappropriate oxygen distribution commonly exist in traditional CWs. Detailed analyses of DO supply and distribution characteristics in different types of CWs were introduced. It can be concluded that atmospheric reaeration (AR) served as the promising point on oxygen intensification. The paper summarized possible optimizations of DO in CWs to improve its decontamination performance. Process (tidal flow, drop aeration, artificial aeration, hybrid systems) and parameter (plant, substrate and operating) optimizations are particularly discussed in detail. Since economic and technical defects are still being cited in current studies, future prospects of oxygen research in CWs terminate this review. Copyright © 2016. Published by Elsevier Ltd.

  1. "Reliability Of Fiber Optic Lans"

    NASA Astrophysics Data System (ADS)

    Code n, Michael; Scholl, Frederick; Hatfield, W. Bryan

    1987-02-01

    Fiber optic Local Area Network Systems are being used to interconnect increasing numbers of nodes. These nodes may include office computer peripherals and terminals, PBX switches, process control equipment and sensors, automated machine tools and robots, and military telemetry and communications equipment. The extensive shared base of capital resources in each system requires that the fiber optic LAN meet stringent reliability and maintainability requirements. These requirements are met by proper system design and by suitable manufacturing and quality procedures at all levels of a vertically integrated manufacturing operation. We will describe the reliability and maintainability of Codenoll's passive star based systems. These include LAN systems compatible with Ethernet (IEEE 802.3) and MAP (IEEE 802.4), and software compatible with IBM Token Ring (IEEE 802.5). No single point of failure exists in this system architecture.

  2. Is Linear Displacement Information Or Angular Displacement Information Used During The Adaptation of Pointing Responses To An Optically Shifted Image?

    NASA Technical Reports Server (NTRS)

    Bautista, Abigail B.

    1994-01-01

    Twenty-four observers looked through a pair of 20 diopter wedge prisms and pointed to an image of a target which was displaced vertically from eye level by 6 cm at a distance of 30 cm. Observers pointed 40 times, using only their right hand, and received error-corrective feedback upon termination of each pointing response (terminal visual feedback). At three testing distances, 20, 30, and 40 cm, ten pre-exposure and ten post-exposure pointing responses were recorded for each hand as observers reached to a mirror-viewed target located at eye level. The difference between pre- and post-exposure pointing response (adaptive shift) was compared for both Exposed and Unexposed hands across all three testing distances. The data were assessed according to the results predicted by two alternative models for processing spatial-information: one using angular displacement information and another using linear displacement information. The angular model of spatial mapping best predicted the observer's pointing response for the Exposed hand. Although the angular adaptive shift did not change significantly as a function of distance (F(2,44) = 1.12, n.s.), the linear adaptive shift increased significantly over the three testing distances 02 44) = 4.90 p less than 0.01).

  3. The termination phase of psychoanalysis in a narcissistic personality.

    PubMed

    Warnes, H

    This paper describes a patient whose termination phase of analysis activated an intense mourning reaction that helped to overcome the stalemate of therapy. After I attempted to demonstrate how her narcissistic armouring yielded when the termination of analysis was agreed upon, the psychological reenactment of a split off (disavowed) trauma of an early loss (her father) and the failure of essential attributes in maternal care became manifested behind her narcissistic defenses. The reconstruction of these events was possible during the process of mourning. At the termination phase she behaved as if she "had lost the war"; from the point of view of her masochism it was a Pyrrhic victory, "a victory through defeat". Contrary to mother, I let her go but then she refused to go, which created a situation that activated a profound mourning reaction leading to important structural changes. A review of the pertinent psychoanalytic literature on termination along with clinical material derived from the termination phase of a patient with a narcissistic personality is presented.

  4. Novel Afferent Terminal Structure in the Crista Ampullaris of the Goldfish, Carassius auratus

    NASA Technical Reports Server (NTRS)

    Lanford, Pamela J.; Popper, Arthur N.

    1996-01-01

    Using transmission electron microscopy, we have identified a new type of afferent terminal structure in the crista ampullaris of the goldfish Carassius auratus. In addition to the bouton-type afferent terminals previously described in the ear of this species, the crista also contained enlarged afferent terminals that enveloped a portion of the basolateral hair cell membrane. The hair cell membrane was evaginated and protruded into the afferent terminal in a glove-and-finger configuration. The membranes of the two cells were regularly aligned in the protruded region of the contact and had a distinct symmetrical electron density. The electron-dense profiles of these contacts were easily identified and were present in every crista sampled. In some cases, efferent terminals synapsed onto the afferents at a point where the hair cell protruded into the terminal. The ultrastructural similarities of the goldfish crista afferents to calyx afferents found in amniotes (birds, reptiles, and mammals) are discussed. The results of the study support the hypothesis that structural variation in the vertebrate inner ear may have evolved much earlier in evolution than previously supposed.

  5. Terminal Dynamics Approach to Discrete Event Systems

    NASA Technical Reports Server (NTRS)

    Zak, Michail; Meyers, Ronald

    1995-01-01

    This paper presents and discusses a mathematical formalism for simulation of discrete event dynamic (DED)-a special type of 'man-made' systems to serve specific purposes of information processing. The main objective of this work is to demonstrate that the mathematical formalism for DED can be based upon a terminal model of Newtonian dynamics which allows one to relax Lipschitz conditions at some discrete points.!.

  6. Long-range wireless mesh network for weather monitoring in unfriendly geographic conditions.

    PubMed

    Toledano-Ayala, Manuel; Herrera-Ruiz, Gilberto; Soto-Zarazúa, Genaro M; Rivas-Araiza, Edgar A; Bazán Trujillo, Rey D; Porrás-Trejo, Rafael E

    2011-01-01

    In this paper a long-range wireless mesh network system is presented. It consists of three main parts: Remote Terminal Units (RTUs), Base Terminal Units (BTUs) and a Central Server (CS). The RTUs share a wireless network transmitting in the industrial, scientific and medical applications ISM band, which reaches up to 64 Km in a single point-to-point communication. A BTU controls the traffic within the network and has as its main task interconnecting it to a Ku-band satellite link using an embedded microcontroller-based gateway. Collected data is stored in a CS and presented to the final user in a numerical and a graphical form in a web portal.

  7. The GRO remote terminal system

    NASA Technical Reports Server (NTRS)

    Zillig, David J.; Valvano, Joe

    1994-01-01

    In March 1992, NASA HQ challenged GSFC/Code 531 to propose a fast, low-cost approach to close the Tracking Data Relay Satellite System (TDRSS) Zone-of-Exclusion (ZOE) over the Indian Ocean in order to provide global communications coverage for the Compton Gamma Ray Observatory (GRO) spacecraft. GRO had lost its tape recording capability which limited its valuable science data return to real-time contacts with the TDRS-E and TDRS-W synchronous data relay satellites, yielding only approximately 62 percent of the possible data obtainable. To achieve global coverage, a TDRS spacecraft would have to be moved over the Indian Ocean out of line-of-sight control of White Sands Ground Terminal (WSGT). To minimize operations life cycle costs, Headquarters also set a goal for remote control, from the WSGT, of the overseas ground station which was required for direct communications with TDRS-1. On August 27, 1992, Code 531 was given the go ahead to implement the proposed GRO Relay Terminal System (GRTS). This paper describes the Remote Ground Relay Terminal (RGRT) which went operational at the Canberra Deep Space Communications Complex (CDSCC) in Canberra, Australia in December 1993 and is currently augmenting the TDRSS constellation in returning between 80-100 percent of GRO science data under the control of a single operator at WSGT.

  8. Potential impacts of advanced technologies on the ATC capacity of high-density terminal areas

    NASA Technical Reports Server (NTRS)

    Simpson, R. W.; Odoni, A. R.; Salas-Roche, F.

    1986-01-01

    Advanced technologies for airborne systems (automatic flight control, flight displays, navigation) and for ground ATC systems (digital communications, improved surveillance and tracking, automated decision-making) create the possibility of advanced ATC operations and procedures which can bring increased capacity for runway systems. A systematic analysis is carried out to identify certain such advanced ATC operations, and then to evaluate the potential benefits occurring over time at typical US high-density airports (Denver and Boston). The study is divided into three parts: (1) A Critical Examination of Factors Which Determine Operational Capacity of Runway Systems at Major Airports, is an intensive review of current US separation criteria and terminal area ATC operations. It identifies 11 new methods to increase the capacity of landings and takeoffs for runway systems; (2) Development of Risk Based Separation Criteria is the development of a rational structure for establishing reduced ATC separation criteria which meet a consistent Target Level of Safety using advanced technology and operational procedures; and (3) Estimation of Capacity Benefits from Advanced Terminal Area Operations - Denver and Boston, provides an estimate of the overall annual improvement in runway capacity which might be expected at Denver and Boston from using some of the advanced ATC procedures developed in Part 1. Whereas Boston achieved a substantial 37% increase, Denver only achieved a 4.7% increase in its overall annual capacity.

  9. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2306 Suspension of payments, termination of contract, and debarment and...

  10. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2306 Suspension of payments, termination of contract, and debarment and...

  11. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2306 Suspension of payments, termination of contract, and debarment and...

  12. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2306 Suspension of payments, termination of contract, and debarment and...

  13. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2306 Suspension of payments, termination of contract, and debarment and...

  14. War Termination Criteria: Linking Strategic Policy and Operational Objectives

    DTIC Science & Technology

    2014-04-16

    leaders of the period, as published in biographies and historical texts, provide insights to the effectiveness of the campaigns. This section outlined the...Critical Survey. Jerusalem : Hebrew University, 1978. Handel, Michael I. “The Study of War Termination.” Journal of Strategic Studies 1, 1978

  15. Hazardous Waste Cleanup: Kinder Morgan Liquid Terminals, LLC in Staten Island, New York

    EPA Pesticide Factsheets

    Exxon Mobil Port Mobil Terminal is a petroleum bulk storage and distribution facility which began operations in 1934 and continues today. The facility is located on the eastern shoreline of the Arthur Kill, Staten Island, City of New York, and is bounded

  16. 14 CFR 93.321 - Transfer and termination of allocations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Involuntary cessation of operations; and (iv) Aviation safety. [65 FR 17733, Apr. 4, 2000] ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Transfer and termination of allocations. 93.321 Section 93.321 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION...

  17. 29 CFR 1917.21 - Open fires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Open fires. 1917.21 Section 1917.21 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.21 Open fires. Open fires and fires in drums or...

  18. 29 CFR 1917.21 - Open fires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Open fires. 1917.21 Section 1917.21 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.21 Open fires. Open fires and fires in drums or...

  19. 29 CFR 1917.21 - Open fires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Open fires. 1917.21 Section 1917.21 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.21 Open fires. Open fires and fires in drums or...

  20. 29 CFR 1917.21 - Open fires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Open fires. 1917.21 Section 1917.21 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.21 Open fires. Open fires and fires in drums or...

  1. 29 CFR 1917.21 - Open fires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Open fires. 1917.21 Section 1917.21 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.21 Open fires. Open fires and fires in drums or...

  2. SPACEBAR: Kinematic design by computer graphics

    NASA Technical Reports Server (NTRS)

    Ricci, R. J.

    1975-01-01

    The interactive graphics computer program SPACEBAR, conceived to reduce the time and complexity associated with the development of kinematic mechanisms on the design board, was described. This program allows the direct design and analysis of mechanisms right at the terminal screen. All input variables, including linkage geometry, stiffness, and applied loading conditions, can be fed into or changed at the terminal and may be displayed in three dimensions. All mechanism configurations can be cycled through their range of travel and viewed in their various geometric positions. Output data includes geometric positioning in orthogonal coordinates of each node point in the mechanism, velocity and acceleration of the node points, and internal loads and displacements of the node points and linkages. All analysis calculations take at most a few seconds to complete. Output data can be viewed at the scope and also printed at the discretion of the user.

  3. Four-body trajectory optimization

    NASA Technical Reports Server (NTRS)

    Pu, C. L.; Edelbaum, T. N.

    1974-01-01

    A comprehensive optimization program has been developed for computing fuel-optimal trajectories between the earth and a point in the sun-earth-moon system. It presents methods for generating fuel optimal two-impulse trajectories which may originate at the earth or a point in space and fuel optimal three-impulse trajectories between two points in space. The extrapolation of the state vector and the computation of the state transition matrix are accomplished by the Stumpff-Weiss method. The cost and constraint gradients are computed analytically in terms of the terminal state and the state transition matrix. The 4-body Lambert problem is solved by using the Newton-Raphson method. An accelerated gradient projection method is used to optimize a 2-impulse trajectory with terminal constraint. The Davidon's Variance Method is used both in the accelerated gradient projection method and the outer loop of a 3-impulse trajectory optimization problem.

  4. A New MPPT Control for Photovoltaic Panels by Instantaneous Maximum Power Point Tracking

    NASA Astrophysics Data System (ADS)

    Tokushima, Daiki; Uchida, Masato; Kanbei, Satoshi; Ishikawa, Hiroki; Naitoh, Haruo

    This paper presents a new maximum power point tracking control for photovoltaic (PV) panels. The control can be categorized into the Perturb and Observe (P & O) method. It utilizes instantaneous voltage ripples at PV panel output terminals caused by the switching of a chopper connected to the panel in order to identify the direction for the maximum power point (MPP). The tracking for the MPP is achieved by a feedback control of the average terminal voltage of the panel. Appropriate use of the instantaneous and the average values of the PV voltage for the separate purposes enables both the quick transient response and the good convergence with almost no ripples simultaneously. The tracking capability is verified experimentally with a 2.8 W PV panel under a controlled experimental setup. A numerical comparison with a conventional P & O confirms that the proposed control extracts much more power from the PV panel.

  5. PAHs in the Great Barrier Reef Lagoon reach potentially toxic levels from coal port activities

    NASA Astrophysics Data System (ADS)

    Burns, Kathryn A.

    2014-05-01

    In view of the controversy over expanding the coastal coal ports bordering the Great Barrier Reef (GBR) Lagoon and the World Heritage Area, I re-evaluated the data published in Burns and Brinkman (2011). I used the US EPA procedures for the determination of Equilibrium Partitioning Sediment Benchmarks (ESBs) for the protection of benthic organisms (Hansen et al., 2003), and the new proposed ANZECC/ARMCANZ (2013) sediment quality guidelines (Simpson et al., 2013) and determined that the coastal sediments offshore from the Hay Point coal terminal and suspended sediments caught in sediment traps inshore and at the offshore coral reefs contained levels of PAHs that approach the estimates for toxicity to benthic and water column organisms. This result is discussed in relation to risks posed to the GBR ecosystem by the port practices and the imminent expansion of the Abbott Point, Hay Point and other coal terminals.

  6. Deep and continuous palliative sedation (terminal sedation): clinical-ethical and philosophical aspects.

    PubMed

    Materstvedt, Lars Johan; Bosshard, Georg

    2009-06-01

    Terminal sedation continues to fuel debate. When confronted with a patient for whom terminal sedation is considered a possible treatment option, decision making can be difficult. In this paper we focus on the clinical-ethical issues, with an aim to provide clinicians with ways of framing the issue from an ethical point of view. In addition to the clinical-ethical issues, terminal sedation touches upon interesting and complex questions of an essentially philosophical nature. What it means to be a "person" is one such question, and is a topic that is relevant to clinical, daily practice. Accordingly, in the latter part of this paper we draw briefly on selected philosophical positions to elucidate this question. A doctor's belief of what it means to be a "person" might well affect their actions. For example, if a doctor believes terminal sedation involves the destruction of the person, they might not be willing to proceed with it.

  7. ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.; Struharik, Steven J.; Diamond, John J.; Stewart, David

    2000-01-01

    The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with the ACTS satellite. The ACTS experiment's program proposed to validate Ka-band satellite and ground station technology. demonstrate future telecommunication services. demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals (Part 1) and the lessons learned throughout their six year operation including the inclined orbit phase of operations (Full Report). An overview of the Ka-band technology and components developed for the ACTS ground stations is presented. Next. the performance of the ground station technology and its evolution during the ACTS campaign are discussed to illustrate the technical tradeoffs made during the program and highlight technical advances by industry to support the ACTS experiments program and terminal operations. Finally. lessons learned during development and operation of the user terminals are discussed for consideration of commercial adoption into future Ka-band systems. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector based offset-fed antenna systems ranging in size from 0.35m to 3.4m antenna diameter. Gateway earth stations included two systems, referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET). The NGS provides tracking, telemetry, and control (TT&C) and Time Division Multiple Access (TDMA) network control functions. The LET supports technology verification and high data rate experiments. The ground stations successfully demonstrated many services and applications at Ka-band in three different modes of operation: circuit switched TDMA using the satellite on-board processor, satellite switched SS-TDMA applications using the on-board Microwave Switch Matrix (MSM), and conventional transponder (bent-pipe) operation. Data rates ranged from 4.8 kbps up to 622 Mbps. Experiments included: 1) low rate (4.8- 1 00's kbps) remote data acquisition and control using small earth stations, 2) moderate rate (1-45 Mbps) experiments included full duplex voice and video conferencing and both full duplex and asymmetric data rate protocol and network evaluation using mid-size ground stations, and 3) link characterization experiments and high data rate (155-622 Mbps) terrestrial and satellite interoperability application experiments conducted by a consortium of experimenters using the large transportable ground stations.

  8. A strategic planning approach for operational-environmental tradeoff assessments in terminal areas

    NASA Astrophysics Data System (ADS)

    Jimenez, Hernando

    This thesis proposes the use of well established statistical analysis techniques, leveraging on recent developments in interactive data visualization capabilities, to quantitatively characterize the interactions, sensitivities, and tradeoffs prevalent in the complex behavior of airport operational and environmental performance. Within the strategic airport planning process, this approach is used in the assessment of airport performance under current/reference conditions, as well as in the evaluation of terminal area solutions under projected demand conditions. More specifically, customized designs of experiments are utilized to guide the intelligent selection and definition of modeling and simulation runs that will yield greater understanding, insight, and information about the inherent systemic complexity of a terminal area, with minimal computational expense. For the research documented in this thesis, a modeling and simulation environment was created featuring three primary components. First, a generator of schedules of operations, based primarily on previous work on aviation demand characterization, whereby growth factors and scheduling adjustment algorithms are applied on appropriate baseline schedules so as to generate notional operational sets representative of consistent future demand conditions. The second component pertains to the modeling and simulation of aircraft operations, defined by a schedule of operations, on the airport surface and within its terminal airspace. This component is a discrete event simulator for multiple queuing models that captures the operational architecture of the entire terminal area along with all the necessary operational logic pertaining to simulated Air Traffic Control (ATC) functions, rules, and standard practices. The third and final component is comprised of legacy aircraft performance, emissions and dispersion, and noise exposure modeling tools, that use the simulation history of aircraft movements to generate estimates of fuel burn, emissions, and noise. The implementation of the proposed approach for the assessment of terminal area solutions incorporates the use of discrete response surface equations, and eliminates the use of quadratic terms that have no practical significance in this context. Rather, attention is entire placed on the main effects of different terminal area solutions, namely additional airport infrastructure, operational improvements, and advanced aircraft concepts, modeled as discrete independent variables for the regression model. Results reveal that an additional runway and a new international terminal, as well as reduced aircraft separation, have a major effect on all operational metrics of interest. In particular, the additional runway has a dominant effect for departure delay metrics and gate hold periods, with moderate interactions with respect to separation reduction. On the other hand, operational metrics for arrivals are co-dependent on additional infrastructure and separation reduction, featuring marginal improvements whenever these two solutions are implemented in isolation, but featuring a dramatic compounding effect when implemented in combination. The magnitude of these main effects for departures and of the interaction between these solutions for arrivals is confirmed through appropriate statistical significance testing. Finally, the inclusion o advanced aircraft concepts is shown to be most beneficial for airborne arrival operations and to a lesser extent for arrival ground movements. More specifically, advanced aircraft concepts were found to be primarily responsible for reductions in volatile organic compounds, unburned hydrocarbons, and particulate matter in this flight regime, but featured relevant interactions with separation reduction and additional airport infrastructure. To address the selection of scenarios for strategic airport planning, a technique for risk-based scenario construction, evaluation, and selection is proposed, incorporating n-dimensional dependence tree probability approximations into a morphological analysis approach. This approach to scenario construction and downselection is a distinct and novel contribution to the scenario planning field as it provides a mathematically and explicitly testable definition for an H parameter, contrasting with the qualitative alternatives in the current state of the art, which can be used in morphological analysis for scenario construction and downselection. By demonstrating that dependence tree probability product approximations are an adequate aggregation function, probability can be used for scenario construction and downselection without any mathematical or methodological restriction on the resolution of the probability scale or the number of morphological alternatives that have previously plagued probabilization and scenario downselection approaches. In addition, this approach requires expert input elicitation that is comparable or less than the current state of the art practices. (Abstract shortened by UMI.)

  9. Analysis of grain quality at receival

    USDA-ARS?s Scientific Manuscript database

    With an emphasis on wheat and to a lesser extent, barley, we describe the series of post harvest transfer stages of grain between the first point of sale and the export terminal. At each transfer point, a document accompanies a grain consignment that pertains to its quality (class, purity, sanitatio...

  10. Final Report - Freight Facilities and System Inventory

    DOT National Transportation Integrated Search

    1995-09-01

    This report describes the general physical and operational characteristics and : bottlenecks to the efficient operation of intermodal terminals and systems in the New York metropolitan area and its vicinity.

  11. Spurious-Mode Control of Same-Phase Drive-Type Ultrasonic Motor

    NASA Astrophysics Data System (ADS)

    Aoyagi, Manabu; Watanabe, Hiroyuki; Tomikawa, Yoshiro; Takano, Takehiro

    2002-05-01

    A same-phase drive-type ultrasonic motor requires a single power source for its operation. In particular, self-oscillation driving is useful for driving a small ultrasonic motor. This type of ultrasonic motor has a spurious mode close to the operation frequency on its stator vibrator. The spurious vibration mode affects the oscillation frequency of a self-oscillation drive circuit. Hence the spurious vibration mode should be restrained or moved away from the neighborhood of the operation frequency. In this paper, we report that an inductor connected at an electrical control terminal provided on standby electrodes for the reverse rotation operation controls only the spurious vibration mode. The effect of an inductor connected at the control terminal was clarified by the simulation of an equivalent circuit and some experiments.

  12. Enumeration of Extended m-Regular Linear Stacks.

    PubMed

    Guo, Qiang-Hui; Sun, Lisa H; Wang, Jian

    2016-12-01

    The contact map of a protein fold in the two-dimensional (2D) square lattice has arc length at least 3, and each internal vertex has degree at most 2, whereas the two terminal vertices have degree at most 3. Recently, Chen, Guo, Sun, and Wang studied the enumeration of [Formula: see text]-regular linear stacks, where each arc has length at least [Formula: see text] and the degree of each vertex is bounded by 2. Since the two terminal points in a protein fold in the 2D square lattice may form contacts with at most three adjacent lattice points, we are led to the study of extended [Formula: see text]-regular linear stacks, in which the degree of each terminal point is bounded by 3. This model is closed to real protein contact maps. Denote the generating functions of the [Formula: see text]-regular linear stacks and the extended [Formula: see text]-regular linear stacks by [Formula: see text] and [Formula: see text], respectively. We show that [Formula: see text] can be written as a rational function of [Formula: see text]. For a certain [Formula: see text], by eliminating [Formula: see text], we obtain an equation satisfied by [Formula: see text] and derive the asymptotic formula of the numbers of [Formula: see text]-regular linear stacks of length [Formula: see text].

  13. Confirming the timing of phase-based costing in oncology studies: a case example in advanced melanoma.

    PubMed

    Atkins, Michael; Coutinho, Anna D; Nunna, Sasikiran; Gupte-Singh, Komal; Eaddy, Michael

    2018-02-01

    The utilization of healthcare services and costs among patients with cancer is often estimated by the phase of care: initial, interim, or terminal. Although their durations are often set arbitrarily, we sought to establish data-driven phases of care using joinpoint regression in an advanced melanoma population as a case example. A retrospective claims database study was conducted to assess the costs of advanced melanoma from distant metastasis diagnosis to death during January 2010-September 2014. Joinpoint regression analysis was applied to identify the best-fitting points, where statistically significant changes in the trend of average monthly costs occurred. To identify the initial phase, average monthly costs were modeled from metastasis diagnosis to death; and were modeled backward from death to metastasis diagnosis for the terminal phase. Points of monthly cost trend inflection denoted ending and starting points. The months between represented the interim phase. A total of 1,671 patients with advanced melanoma who died met the eligibility criteria. Initial phase was identified as the 5-month period starting with diagnosis of metastasis, after which there was a sharp, significant decline in monthly cost trend (monthly percent change [MPC] = -13.0%; 95% CI = -16.9% to -8.8%). Terminal phase was defined as the 5-month period before death (MPC = -14.0%; 95% CI = -17.6% to -10.2%). The claims-based algorithm may under-estimate patients due to misclassifications, and may over-estimate terminal phase costs because hospital and emergency visits were used as a death proxy. Also, recently approved therapies were not included, which may under-estimate advanced melanoma costs. In this advanced melanoma population, optimal duration of the initial and terminal phases of care was 5 months immediately after diagnosis of metastasis and before death, respectively. Joinpoint regression can be used to provide data-supported phase of cancer care durations, but should be combined with clinical judgement.

  14. A General Method for Solving Systems of Non-Linear Equations

    NASA Technical Reports Server (NTRS)

    Nachtsheim, Philip R.; Deiss, Ron (Technical Monitor)

    1995-01-01

    The method of steepest descent is modified so that accelerated convergence is achieved near a root. It is assumed that the function of interest can be approximated near a root by a quadratic form. An eigenvector of the quadratic form is found by evaluating the function and its gradient at an arbitrary point and another suitably selected point. The terminal point of the eigenvector is chosen to lie on the line segment joining the two points. The terminal point found lies on an axis of the quadratic form. The selection of a suitable step size at this point leads directly to the root in the direction of steepest descent in a single step. Newton's root finding method not infrequently diverges if the starting point is far from the root. However, the current method in these regions merely reverts to the method of steepest descent with an adaptive step size. The current method's performance should match that of the Levenberg-Marquardt root finding method since they both share the ability to converge from a starting point far from the root and both exhibit quadratic convergence near a root. The Levenberg-Marquardt method requires storage for coefficients of linear equations. The current method which does not require the solution of linear equations requires more time for additional function and gradient evaluations. The classic trade off of time for space separates the two methods.

  15. Heart failure, saxagliptin, and diabetes mellitus: observations from the SAVOR-TIMI 53 randomized trial.

    PubMed

    Scirica, Benjamin M; Braunwald, Eugene; Raz, Itamar; Cavender, Matthew A; Morrow, David A; Jarolim, Petr; Udell, Jacob A; Mosenzon, Ofri; Im, KyungAh; Umez-Eronini, Amarachi A; Pollack, Pia S; Hirshberg, Boaz; Frederich, Robert; Lewis, Basil S; McGuire, Darren K; Davidson, Jaime; Steg, Ph Gabriel; Bhatt, Deepak L

    2014-10-28

    Diabetes mellitus and heart failure frequently coexist. However, few diabetes mellitus trials have prospectively evaluated and adjudicated heart failure as an end point. A total of 16 492 patients with type 2 diabetes mellitus and a history of, or at risk of, cardiovascular events were randomized to saxagliptin or placebo (mean follow-up, 2.1 years). The primary end point was the composite of cardiovascular death, myocardial infarction, or ischemic stroke. Hospitalization for heart failure was a predefined component of the secondary end point. Baseline N-terminal pro B-type natriuretic peptide was measured in 12 301 patients. More patients treated with saxagliptin (289, 3.5%) were hospitalized for heart failure compared with placebo (228, 2.8%; hazard ratio, 1.27; 95% confidence intercal, 1.07-1.51; P=0.007). Corresponding rates at 12 months were 1.9% versus 1.3% (hazard ratio, 1.46; 95% confidence interval, 1.15-1.88; P=0.002), with no significant difference thereafter (time-varying interaction, P=0.017). Subjects at greatest risk of hospitalization for heart failure had previous heart failure, an estimated glomerular filtration rate ≤60 mL/min, or elevated baseline levels of N-terminal pro B-type natriuretic peptide. There was no evidence of heterogeneity between N-terminal pro B-type natriuretic peptide and saxagliptin (P for interaction=0.46), although the absolute risk excess for heart failure with saxagliptin was greatest in the highest N-terminal pro B-type natriuretic peptide quartile (2.1%). Even in patients at high risk of hospitalization for heart failure, the risk of the primary and secondary end points were similar between treatment groups. In the context of balanced primary and secondary end points, saxagliptin treatment was associated with an increased risk or hospitalization for heart failure. This increase in risk was highest among patients with elevated levels of natriuretic peptides, previous heart failure, or chronic kidney disease. http://www.clinicaltrials.gov. Unique identifier: NCT01107886. © 2014 American Heart Association, Inc.

  16. 29 CFR 1917.126 - River banks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false River banks. 1917.126 Section 1917.126 Labor Regulations...) MARINE TERMINALS Terminal Facilities § 1917.126 River banks. (a) This section applies to temporary installations or temporary operations near a river bank. (b) Where working surfaces at river banks slope so...

  17. 29 CFR 1917.24 - Carbon monoxide.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Carbon monoxide. 1917.24 Section 1917.24 Labor Regulations...) MARINE TERMINALS Marine Terminal Operations § 1917.24 Carbon monoxide. (a) Exposure limits. The carbon... employees shall be removed from the enclosed space if the carbon monoxide concentration exceeds a ceiling of...

  18. 29 CFR 1917.154 - Compressed air.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Compressed air. 1917.154 Section 1917.154 Labor Regulations...) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.154 Compressed air. Employees shall be... this part during cleaning with compressed air. Compressed air used for cleaning shall not exceed a...

  19. 29 CFR 1917.154 - Compressed air.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Compressed air. 1917.154 Section 1917.154 Labor Regulations...) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.154 Compressed air. Employees shall be... this part during cleaning with compressed air. Compressed air used for cleaning shall not exceed a...

  20. 29 CFR 1917.154 - Compressed air.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Compressed air. 1917.154 Section 1917.154 Labor Regulations...) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.154 Compressed air. Employees shall be... this part during cleaning with compressed air. Compressed air used for cleaning shall not exceed a...

  1. 29 CFR 1917.19 - Movement of barges and railcars.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Movement of barges and railcars. 1917.19 Section 1917.19 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.19 Movement of barges and...

  2. 29 CFR 1917.24 - Carbon monoxide.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Carbon monoxide. 1917.24 Section 1917.24 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.24 Carbon monoxide. (a) Exposure limits. The carbon monoxide content of the atmosphere in...

  3. 29 CFR 1917.24 - Carbon monoxide.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Carbon monoxide. 1917.24 Section 1917.24 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.24 Carbon monoxide. (a) Exposure limits. The carbon monoxide content of the atmosphere in...

  4. 29 CFR 1917.24 - Carbon monoxide.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Carbon monoxide. 1917.24 Section 1917.24 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.24 Carbon monoxide. (a) Exposure limits. The carbon monoxide content of the atmosphere in...

  5. 29 CFR 1917.157 - Battery charging and changing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false Battery charging and changing. 1917.157 Section 1917.157..., DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.157 Battery charging and changing. (a) Only designated persons shall change or charge batteries. (b) Battery charging...

  6. 46 CFR 535.408 - Activities that may be conducted without further filings.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... FOREIGN COMMERCE OCEAN COMMON CARRIER AND MARINE TERMINAL OPERATOR AGREEMENTS SUBJECT TO THE SHIPPING ACT... terms and conditions of space allocation and slot sales, the procedures for allocating space, the establishment of space charter rates, and the terms and conditions of charter parties; (3) Stevedoring, terminal...

  7. 13 CFR 108.1900 - Termination of participation as a NMVC Company.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Termination of participation as a NMVC Company. 108.1900 Section 108.1900 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION NEW MARKETS VENTURE CAPITAL (âNMVCâ) PROGRAM Ending Operations as a NMVC Company § 108.1900...

  8. Terminal area air traffic control simulation

    NASA Technical Reports Server (NTRS)

    1977-01-01

    To study the impact of advanced aeronautical technologies on operations to and from terminal airports, a computer model of air traffic movements was developed. The advantages of fast-time simulation are discussed, and the arrival scheduling and flight simulation are described. A New York area study, user's guide, and programmer's guide are included.

  9. 29 CFR 1917.157 - Battery charging and changing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 7 2011-07-01 2011-07-01 false Battery charging and changing. 1917.157 Section 1917.157..., DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.157 Battery charging and changing. (a) Only designated persons shall change or charge batteries. (b) Battery charging...

  10. 29 CFR 1917.157 - Battery charging and changing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Battery charging and changing. 1917.157 Section 1917.157..., DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.157 Battery charging and changing. (a) Only designated persons shall change or charge batteries. (b) Battery charging...

  11. 29 CFR 1917.157 - Battery charging and changing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Battery charging and changing. 1917.157 Section 1917.157..., DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.157 Battery charging and changing. (a) Only designated persons shall change or charge batteries. (b) Battery charging...

  12. 29 CFR 1917.157 - Battery charging and changing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Battery charging and changing. 1917.157 Section 1917.157..., DEPARTMENT OF LABOR (CONTINUED) MARINE TERMINALS Related Terminal Operations and Equipment § 1917.157 Battery charging and changing. (a) Only designated persons shall change or charge batteries. (b) Battery charging...

  13. 29 CFR 1917.30 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency...

  14. 29 CFR 1917.126 - River banks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) MARINE TERMINALS Terminal Facilities § 1917.126 River banks. (a) This section applies to temporary installations or temporary operations near a river bank. (b) Where working surfaces at river banks slope so... 29 Labor 7 2010-07-01 2010-07-01 false River banks. 1917.126 Section 1917.126 Labor Regulations...

  15. Discrete event simulation model for external yard choice of import container terminal in a port buffer area

    NASA Astrophysics Data System (ADS)

    Rusgiyarto, Ferry; Sjafruddin, Ade; Frazila, Russ Bona; Suprayogi

    2017-06-01

    Increasing container traffic and land acquisition problem for terminal expansion leads to usage of external yard in a port buffer area. This condition influenced the terminal performance because a road which connects the terminal and the external yard was also used by non-container traffic. Location choice problem considered to solve this condition, but the previous research has not taken account a stochastic condition of container arrival rate and service time yet. Bi-level programming framework was used to find optimum location configuration. In the lower-level, there was a problem to construct the equation, which correlated the terminal operation and the road due to different time cycle equilibrium. Container moves from the quay to a terminal gate in a daily unit of time, meanwhile, it moves from the terminal gate to the external yard through the road in a minute unit of time. If the equation formulated in hourly unit equilibrium, it cannot catch up the container movement characteristics in the terminal. Meanwhile, if the equation formulated in daily unit equilibrium, it cannot catch up the road traffic movement characteristics in the road. This problem can be addressed using simulation model. Discrete Event Simulation Model was used to simulate import container flow processes in the container terminal and external yard. Optimum location configuration in the upper-level was the combinatorial problem, which was solved by Full Enumeration approach. The objective function of the external yard location model was to minimize user transport cost (or time) and to maximize operator benefit. Numerical experiment was run for the scenario assumption of two container handling ways, three external yards, and thirty-day simulation periods. Jakarta International Container Terminal (JICT) container characteristics data was referred for the simulation. Based on five runs which were 5, 10, 15, 20, and 30 repetitions, operation one of three available external yards (external yard - 3) was the optimum result. Apparently, the model confirmed the hypothesis that there was an optimum configuration of the external yard. Nevertheless, the model needs detail elaboration related to the objective function and the optimization constraint. It requires detail validation, in term of service time value, distribution pattern, and arrival rate in each unit server modeled in the next step of the research. The model gave unique and relatively consistent value of each run. It was indicated that the method has a chance to solve the research problem.

  16. Performance optimization of a photovoltaic chain conversion by the PWM control

    NASA Astrophysics Data System (ADS)

    Rezoug, M. R.; Chenni, R.

    2017-02-01

    The interest of the research technique of maximum power point tracking, exposed by this article, lays in the fact of work instantly on the real characteristic of the photovoltaic module. This work is based on instantaneous measurements of its terminals' current & voltage as well as the exploitation of the characteristic "Power - Duty Cycle" to define rapidly the Duty cycle in which power reaches its maximum value. To ensure instantaneous tracking of the point of maximum power, we use "DC/DC Converter" based on "Pulse Wave Modulation's (PWM) Command" controlled by an algorithm implanted in a microcontroller's memory. This algorithm responds to the quick changes in climate (sunlight and temperature). To identify the control parameters "VPV & IPV" at any change in operating conditions, sensors are projected. this algorithm applied to the Duty cycle of the static converter enables the control of power supplied by the photovoltaic generator thanks to oscillatory movement around the MPP. Our article highlights the importance of this technique which lays in its simplicity and performance in changing climatic conditions. This efficiency is confirmed by experimental tests and this technique will improve its predecessors.

  17. ACTS Multibeam Antenna On-Orbit Performance

    NASA Technical Reports Server (NTRS)

    Acosta, R.; Wright, D.; Mitchell, Kenneth

    1996-01-01

    The Advanced Communications Technology Satellite (ACTS) launched in September 1993 introduces several new technologies including a multibeam antenna (MBA) operating at Ka-band. The MBA with fixed and rapidly reconfigurable spot beams serves users equipped with small aperture terminals within the coverage area. The antenna produces spot beams with approximately 0.3 degrees beamwidth and gains of approximately 50 dBi. A number of MBA performance evaluations have been performed since the ACTS launch. These evaluations were designed to assess MBA performance (e.g., beam pointing stability, beam shape, gain, etc.) in the space environment. The on-orbit measurements found systematic environmental perturbation to the MBA beam pointing. These perturbations were found to be imposed by satellite attitude control system, antenna and spacecraft mechanical alignments, on-orbit thermal effects, etc. As a result, the footprint coverage of the MBA may not exactly cover the intended service area at all times. This report describes the space environment effects on the ACTS MBA performance as a function of time of the day and time of the year and compensation approaches for these effects.

  18. Quiet Short-Haul Research Airplane (QSRA) model select panel functional description

    NASA Technical Reports Server (NTRS)

    Watson, D. M.

    1982-01-01

    The QSRA, when equipped with programmable color cathode ray tube displays, a head up display, a general purpose digital computer and a microwave landing system receiver, will provide a capability to do handling qualities studies and terminal area operating systems experiments as well as to enhance an experimenter's ability to obtain repeatable aircraft performance data. The operating systems experiments include the capability to generate minimum fuel approach and departure paths and to conduct precision approaches to a STOLport runway. The mode select panel is designed to provide both the flexibility needed for a variety of flight test experiments and the minimum workload operation required by pilots flying into congested terminal traffic areas.

  19. Terminal-oriented computer-communication networks.

    NASA Technical Reports Server (NTRS)

    Schwartz, M.; Boorstyn, R. R.; Pickholtz, R. L.

    1972-01-01

    Four examples of currently operating computer-communication networks are described in this tutorial paper. They include the TYMNET network, the GE Information Services network, the NASDAQ over-the-counter stock-quotation system, and the Computer Sciences Infonet. These networks all use programmable concentrators for combining a multiplicity of terminals. Included in the discussion for each network is a description of the overall network structure, the handling and transmission of messages, communication requirements, routing and reliability consideration where applicable, operating data and design specifications where available, and unique design features in the area of computer communications.

  20. Analysis of 2015 Winter In-Flight Icing Case Studies with Ground-Based Remote Sensing Systems Compared to In-Situ SLW Sondes

    NASA Technical Reports Server (NTRS)

    Serke, David J.; King, Michael Christopher; Hansen, Reid; Reehorst, Andrew L.

    2016-01-01

    National Aeronautics and Space Administration (NASA) and the National Center for Atmospheric Research (NCAR) have developed an icing remote sensing technology that has demonstrated skill at detecting and classifying icing hazards in a vertical column above an instrumented ground station. This technology has recently been extended to provide volumetric coverage surrounding an airport. Building on the existing vertical pointing system, the new method for providing volumetric coverage utilizes a vertical pointing cloud radar, a multi-frequency microwave radiometer with azimuth and elevation pointing, and a NEXRAD radar. The new terminal area icing remote sensing system processes the data streams from these instruments to derive temperature, liquid water content, and cloud droplet size for each examined point in space. These data are then combined to ultimately provide icing hazard classification along defined approach paths into an airport. To date, statistical comparisons of the vertical profiling technology have been made to Pilot Reports and Icing Forecast Products. With the extension into relatively large area coverage and the output of microphysical properties in addition to icing severity, the use of these comparators is not appropriate and a more rigorous assessment is required. NASA conducted a field campaign during the early months of 2015 to develop a database to enable the assessment of the new terminal area icing remote sensing system and further refinement of terminal area icing weather information technologies in general. In addition to the ground-based remote sensors listed earlier, in-situ icing environment measurements by weather balloons were performed to produce a comprehensive comparison database. Balloon data gathered consisted of temperature, humidity, pressure, super-cooled liquid water content, and 3-D position with time. Comparison data plots of weather balloon and remote measurements, weather balloon flight paths, bulk comparisons of integrated liquid water content and icing cloud extent agreement, and terminal-area hazard displays are presented. Discussions of agreement quality and paths for future development are also included.

Top