Sample records for post-closure permit application

  1. Closure of hazardous and mixed radioactive waste management units at DOE facilities. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less

  2. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with themore » monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.« less

  3. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analysesmore » and forms, inspection logs, equipment identification, etc.« less

  4. 78 FR 20035 - Adequacy of Oregon Municipal Solid Waste Landfill Permit Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-03

    ... to issue Research, Development, and Demonstration (RD&D) Permits to owners and operators of MSWLF... Landfill (MSWLF) criteria in 40 CFR part 258 to allow Research, Development, and Demonstration (RD&D... authority for variance of criteria for groundwater monitoring, closure and post-closure requirements (except...

  5. Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ziock, Robert; Little, Bonnie Colleen

    The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised andmore » updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.« less

  6. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specifiedmore » in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.« less

  7. Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental

    2008-02-01

    This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardousmore » waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the CRSDB, CRSP, and KHQ that differ from those established under the expired PCP, including modified suites of laboratory analytes (RCRA groundwater target compounds) for each site and annual rather than semiannual sampling frequencies for the CRSDB and KHQ. The new PCP also specifies the RCRA post-closure groundwater monitoring requirements for the ECRWP, a closed TSD unit that was not addressed in the expired PCP.« less

  8. Calendar year 1996 annual groundwater monitoring report for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-02-01

    This annual monitoring report contains groundwater and surface water monitoring data obtained in the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) during calendar year (CY) 1996. The Chestnut Ridge Regime encompasses a section of Chestnut Ridge west of Scarboro Road and east of an unnamed drainage feature southwest of the US Department of Energy (DOE) Oak Ridge Y-12 Plant (unless otherwise noted, directions are in reference to the Y-12 Plant administrative grid). The Chestnut Ridge Regime contains several sites used for management of hazardous and nonhazardous wastes associated with plant operations. Groundwater and surface water quality monitoring associated with thesemore » waste management sites is performed under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). Included in this annual monitoring report are the groundwater monitoring data obtained in compliance with the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit for the Chestnut Ridge Regime (post-closure permit) issued by the Tennessee Department of Environment and Conservation (TDEC) in June 1996. Besides the signed certification statement and the RCRA facility information summarized below, condition II.C.6 of the post-closure permit requires annual reporting of groundwater monitoring activities, inclusive of the analytical data and results of applicable data evaluations, performed at three RCRA hazardous waste treatment, storage, or disposal (TSD) units: the Chestnut Ridge Sediment Disposal Basin (Sediment Disposal Basin), the Chestnut Ridge Security Pits (Security Pits), and Kerr Hollow Quarry.« less

  9. 40 CFR 266.102 - Permit standards for burners.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... subpart G (Closure and post-closure), §§ 264.111-264.115; (viii) In subpart H (Financial requirements... prescribed in paragraph (e)(6) of this section; (C) Appropriate controls of the hazardous waste firing system...; (C) Appropriate controls on operation and maintenance of the hazardous waste firing system and any...

  10. 40 CFR 266.102 - Permit standards for burners.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... subpart G (Closure and post-closure), §§ 264.111-264.115; (viii) In subpart H (Financial requirements... prescribed in paragraph (e)(6) of this section; (C) Appropriate controls of the hazardous waste firing system...; (C) Appropriate controls on operation and maintenance of the hazardous waste firing system and any...

  11. 40 CFR 266.102 - Permit standards for burners.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... subpart G (Closure and post-closure), §§ 264.111-264.115; (viii) In subpart H (Financial requirements... prescribed in paragraph (e)(6) of this section; (C) Appropriate controls of the hazardous waste firing system...; (C) Appropriate controls on operation and maintenance of the hazardous waste firing system and any...

  12. 40 CFR 266.102 - Permit standards for burners.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... subpart G (Closure and post-closure), §§ 264.111-264.115; (viii) In subpart H (Financial requirements... prescribed in paragraph (e)(6) of this section; (C) Appropriate controls of the hazardous waste firing system...; (C) Appropriate controls on operation and maintenance of the hazardous waste firing system and any...

  13. 40 CFR 266.102 - Permit standards for burners.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... subpart G (Closure and post-closure), §§ 264.111-264.115; (viii) In subpart H (Financial requirements... prescribed in paragraph (e)(6) of this section; (C) Appropriate controls of the hazardous waste firing system...; (C) Appropriate controls on operation and maintenance of the hazardous waste firing system and any...

  14. 300 Area waste acid treatment system closure plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to themore » General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.« less

  15. Hanford facility dangerous waste permit application, general information portion. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).« less

  16. 40 CFR 264.280 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Closure and post-closure care. 264.280 Section 264.280 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... § 264.278, except that soil-pore liquid monitoring may be terminated 90 days after the last application...

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Willoughby III, O.H.; Lukes, G.C.

    EnergySolutions, LLC operates its Mixed Waste Facility at Clive, Utah under the provisions of its State-issued Part B Permit. The facility accepts waste that contains both hazardous and radioactive contaminants. Utah is an EPA Agreement State and therefore the Utah Division of Solid and Hazardous Waste (DSHW) is authorized to regulate the hazardous waste operations at the facility. The radioactive portion of the waste is regulated by the Utah Division of Radiation Control. 40 CFR 264.142 outlines the facility requirements for Closure Costs. The owner or operator must have a detailed written estimate of the cost of closing the facilitymore » in accordance with the rules. For many years the State of Utah had relied on the facility's estimate of closure costs as the amount that needed to be funded. This amount is reviewed annually and adjusted for inflation and for changes at the facility. In 2004 the agency and the facility requested bids from independent contractors to provide their estimate for closure costs. Three engineering firms bid on the project. The facility funded the project and both the agency and the facility chose one of the firms to provide an independent estimate. The engineering firms met with both parties and toured the facility. They were also provided with the current closure cost line items. Each firm provided an estimated cost for closure of the facility at the point in the facility's active life that would make the closure most expensive. Included with the direct costs were indirect line items such as overhead, profit, mobilization, hazardous working conditions and regulatory oversight. The agency and the facility reviewed the independent estimates and negotiated a final Closure and Post-Closure Cost Estimate for the Mixed Waste Facility. There are several mechanisms allowed under the rules to fund the Closure and Post- Closure Care Funds. EnergySolutions has chosen to fund their costs through the use of an insurance policy. Changing mechanisms from an irrevocable trust to an insurance policy required extensive review by the DSHW and the Utah Attorney General's Office. The duration of the Post-Closure Care Period is generally designated as 30 years under the hazardous waste rules. The Legislature of the State of Utah commissioned a review of the need for Perpetual Care Funds for hazardous waste facilities. This fund would provide funds for maintenance and monitoring of facilities following termination of the Post-Closure Permit. The DSHW has recommended to the legislature that a perpetual care fund be created. The legislature will study the recommendation and take appropriate action. (authors)« less

  18. 40 CFR 146.73 - Financial responsibility for post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Financial responsibility for post... Standards Applicable to Class I Hazardous Waste Injection Wells § 146.73 Financial responsibility for post-closure care. The owner or operator shall demonstrate and maintain financial responsibility for post...

  19. 40 CFR 146.73 - Financial responsibility for post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Financial responsibility for post... Standards Applicable to Class I Hazardous Waste Injection Wells § 146.73 Financial responsibility for post-closure care. The owner or operator shall demonstrate and maintain financial responsibility for post...

  20. 40 CFR 146.73 - Financial responsibility for post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Financial responsibility for post... Standards Applicable to Class I Hazardous Waste Injection Wells § 146.73 Financial responsibility for post-closure care. The owner or operator shall demonstrate and maintain financial responsibility for post...

  1. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  2. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  3. Rubber closures for freeze-dried products.

    PubMed

    Hopkins, G H

    1976-10-01

    Once a biological product has been developed to perform its required medical or pharmaceutical function, it is essential that a container-closure system by chosen which will preserve the efficacy of the product up to the point of administration. The general requirements applicable to proper closure function will be reviewed and the suitability of natural and synthetic elastomers to perform these functions will be discussed. The specialized application of elastomeric materials as closures for freeze-dried products presents additional requirements which are superimposed upon those previously discussed. The first of these unique considerations relates to the proper physical design which will permit the outgassing of water vapor during the sublimation step in the lyophilizing chamber. During this outgassing the design must also permit the closure to remain affixed in the neck while only partially inserted. Since these preparations are lyophilized because they are unstable in aqueous solutions, the elastomer used must constitute an effective barrier to the transmission of moisture vapor through the closure. The MVT and gas transmission properties of elastomers will be discussed. Special consideration will be given to the extremely low temperatures used in the sublimation, stoppering, and storage before use of lyophilized products. The phenomenon of glass transition points with different elastomers will be explained as its relation to satisfactory performance of the closure function at low temperatures.

  4. 40 CFR 258.74 - Allowable mechanisms.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... post-closure care, up to an amount equal to the face amount of the policy. (3) The insurance policy must be issued for a face amount at least equal to the current cost estimate for closure or post-closure care, whichever is applicable, except as provided in paragraph (k) of this section. The term face...

  5. 40 CFR 258.74 - Allowable mechanisms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... post-closure care, up to an amount equal to the face amount of the policy. (3) The insurance policy must be issued for a face amount at least equal to the current cost estimate for closure or post-closure care, whichever is applicable, except as provided in paragraph (k) of this section. The term face...

  6. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) The pressure differential between pre-injection and predicted post-injection pressures in the... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of...

  7. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) The pressure differential between pre-injection and predicted post-injection pressures in the... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of...

  8. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) The pressure differential between pre-injection and predicted post-injection pressures in the... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of...

  9. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Fiscal Year 2015 (October 2014–September 2015), Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs); CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2015 (October 2014 through September 2015). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section inmore » Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.« less

  10. 40 CFR 258.50 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...

  11. 40 CFR 258.50 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...

  12. 40 CFR 258.50 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...

  13. 40 CFR 258.50 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...

  14. USER'S GUIDE TO CLOSURE EVALUATION SYSTEM: CES BETA-TEST VERSION 1.0

    EPA Science Inventory

    The Closure Evaluation System (CES) is a decision support tool, developed by the U.S. EPA's Risk Reduction Engineering Laboratory, to assist reviewers and preparers of Resource Conservation and Recovery Act (RCRA) Part B permit applications. CES is designed to serve as a checklis...

  15. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of a Class VI well must prepare, maintain, and comply with a plan for post-injection site care and site...

  16. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less

  17. 10 CFR Appendix A to Part 40 - Criteria Relating to the Operation of Uranium Mills and the Disposition of Tailings or Wastes...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to be relied upon for seepage control, tests must be conducted with representative tailings solutions... licensee shall control, minimize, or eliminate post-closure escape of nonradiological hazardous... beyond the control of the licensee. The phrase permits consideration of the cost of compliance only to...

  18. Final closure plan for the high-explosives open burn treatment facility at Lawrence Livermore National Laboratory Experimental Test Site 300

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mathews, S.

    This document addresses the interim status closure of the HE Open Bum Treatment Facility, as detailed by Title 22, Division 4.5, Chapter 15, Article 7 of the Califonia Code of Regulations (CCR) and by Title 40, Code of Federal Regulations (CFR) Part 265, Subpart G, ``Closure and Post Closure.`` The Closure Plan (Chapter 1) and the Post- Closure Plan (Chapter 2) address the concept of long-term hazard elimination. The Closure Plan provides for capping and grading the HE Open Bum Treatment Facility and revegetating the immediate area in accordance with applicable requirements. The Closure Plan also reflects careful consideration ofmore » site location and topography, geologic and hydrologic factors, climate, cover characteristics, type and amount of wastes, and the potential for contaminant migration. The Post-Closure Plan is designed to allow LLNL to monitor the movement, if any, of pollutants from the treatment area. In addition, quarterly inspections will ensure that all surfaces of the closed facility, including the cover and diversion ditches, remain in good repair, thus precluding the potential for contaminant migration.« less

  19. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, Alissa J.

    2015-01-01

    This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly atmore » CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.« less

  20. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2017, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Alvarado, Juan

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment CAU 91, Area 3 U-3fi Injection Well CAU 92, Area 6 Decon Pond Facility CAU 110, Area 3 WMD U-3ax/bl Crater CAU 111, Area 5 WMD Retired Mixed Waste Pits CAU 112, Area 23 Hazardous Waste Trenches The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110;more » and quarterly at CAU 111. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 1.0 inches in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAU 110, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted in addition to the visual inspections. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. This report will address all monitoring items notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 4 of Permit NEV HW0101 was issued effective December 10, 2015, and remains in effect until December 10, 2020.« less

  1. POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 110: AREA 3 WMD U-3AX/BL CRATER, NEVADA TEST SITE, NEVADA FOR THE PERIOD JULY 2004 - JUNE 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    2005-08-01

    This Post-Closure Inspection and Monitoring report provides the results of inspections and monitoring for Corrective Action Unit (CAU) 110, Area 3 Waste Management Division (WMD) U-3ax/bl Crater. This report includes an analysis and summary of the site inspections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at CAU 110, for the annual period July 2004 through June 2005. Site inspections of the cover were performed quarterly to identify any significant changes to the site requiring action. The overall condition of the cover, cover vegetation, perimeter fence, and use restriction warning signs was good. Settling was observed thatmore » exceeded the action level as specified in Section VII.B.7 of the Hazardous Waste Permit Number NEV HW009 (Nevada Division of Environmental Protection, 2000). This permit states that cracks or settling greater than 15 centimeters (cm) (6 inches [in]) deep that extend 1.0 meter (m) (3 feet [ft]) or more on the cover will be evaluated and repaired within 60 days of detection.« less

  2. 77 FR 36273 - Public Meeting on Draft Permitting Guidance for Oil and Gas Hydraulic Fracturing Activities Using...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ...The Environmental Protection Agency (EPA or agency) is announcing a public meeting to discuss draft permitting guidance the agency has developed on the use of diesel fuels in oil and gas hydraulic fracturing and to solicit input during the public comment period. The meeting is open to all interested parties. The agency requests input on the following technical aspects of the draft permitting guidance: Diesel fuels description; diesel fuels usage information; permit duration and well closure; area of review; information submitted with the permit application; and monitoring.

  3. RCRA, superfund and EPCRA hotline training module. Introduction to: Closure/post-closure (40 cfr parts 264/265, subpart g) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module explains the difference between closure and post-closure. It lists the types of facilities that are subject to closure/post-closures and defines the difference between partial and final closure. It specifies who submits a closure plan and when a closure plan must be submitted, lists the steps in the process, and states the time frame for submittal. It identifies when and how a closure must be amended. It explains the time frame for notification of closure and the deadlines for beginning and completing closure. It specifies which facilities need contingent post-closure plans and lists and the elements of post-closure andmore » cites the requirements. It specifies the conditions and timing for amending a post-closure plan and states who must certify closure/post-closure.« less

  4. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  5. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  6. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 265.310... DISPOSAL FACILITIES Landfills § 265.310 Closure and post-closure care. (a) At final closure of the landfill... subsoils present. (b) After final closure, the owner or operator must comply with all post-closure...

  7. 40 CFR 264.110 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Closure and Post....115 (which concern closure) apply to the owners and operators of all hazardous waste management...

  8. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  9. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  10. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  11. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  12. 40 CFR 264.228 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Closure and post-closure care. 264.228... Surface Impoundments § 264.228 Closure and post-closure care. (a) At closure, the owner or operator must... materials are left in place at final closure, the owner or operator must comply with all post-closure...

  13. 40 CFR 265.228 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Closure and post-closure care. 265.228... DISPOSAL FACILITIES Surface Impoundments § 265.228 Closure and post-closure care. (a) At closure, the owner... impoundment and provide post-closure care for a landfill under subpart G and § 265.310, including the...

  14. 40 CFR 265.228 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Closure and post-closure care. 265.228... DISPOSAL FACILITIES Surface Impoundments § 265.228 Closure and post-closure care. (a) At closure, the owner... impoundment and provide post-closure care for a landfill under subpart G and § 265.310, including the...

  15. 40 CFR 264.110 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Closure and Post... and operators of: (1) All hazardous waste disposal facilities; (2) Waste piles and surface....115 (which concern closure) apply to the owners and operators of all hazardous waste management...

  16. Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-02-21

    This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111more » (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.« less

  17. 40 CFR 264.146 - Use of a mechanism for financial assurance of both closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance of both closure and post-closure care. 264.146 Section 264.146 Protection of Environment... mechanism for financial assurance of both closure and post-closure care. An owner or operator may satisfy the requirements for financial assurance for both closure and post-closure care for one or more...

  18. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  19. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  20. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  1. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  2. 40 CFR 264.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... days after an unexpected event has occurred which has affected the post-closure plan. An owner or... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Post-closure plan; amendment of plan... FACILITIES Closure and Post-Closure § 264.118 Post-closure plan; amendment of plan. (a) Written Plan. The...

  3. 40 CFR 265.146 - Use of a mechanism for financial assurance of both closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance of both closure and post-closure care. 265.146 Section 265.146 Protection of Environment... Use of a mechanism for financial assurance of both closure and post-closure care. An owner or operator may satisfy the requirements for financial assurance for both closure and post-closure care for one or...

  4. Alaska Department of Labor and Workforce Development

    Science.gov Websites

    Applications and Permits Employment Application (PDF) (Word) Youth Work Permit (PDF) Post a Job To advertise a job opening to Alaska job seekers, post a job on Alexsys. ALEXsys Alaska's Job Bank The job opening

  5. Closure of skin incision by dual wavelength (980 and 1064 nm) laser application.

    PubMed

    Uba, Abdullahi Ibrahim; Tabakoglu, Haşim Ozgur; Abdullahi, Umar Aliyu; Sani, Musbahu Muhammad

    2017-04-01

    Thermal effect of dual wavelength (980 and 1064 nm) laser application in skin incision closure was assessed on 18 male and female Wister rats. 1-cm-long incisions were made on the shaved dorsal region of 220-250 g animals. The incisions were closed by laser irradiation at 1 W and exposure time, 5 seconds in continuous-wave mode (CW) and 1 W and exposure time, 10 seconds in pulsed mode to deliver total energies of 5 J and 10 J per spot onto the incisions, respectively. Animals from each group were sacrificed at 0th, 4th, and 7th days and the skin samples of the weld area were excised for histological analysis using Hematoxylin and Eosin (H & E) stain. Mean thermally altered area (TAA) of CW-mode laser-treated groups was found to increase significantly (p < 0.05) compared with pulsed mode laser treated group at 0th and 4th days post-irradiation while no significant difference (p > 0.05) was statistically found at 7th day post-irradiation. Moreover, tighter closure was observed with CW group at 7th day post-irradiation. We thus conclude that 1 W, 5 J for 5 seconds CW mode laser application of 980 and 1064 nm combined beam form in skin incision closure was found to have absolute wound healing capability with minimal thermal alteration.

  6. 75 FR 71428 - Clean River Power 14, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ...-foot-high reinforced concrete intake structure adjacent to the Martin Creek weir with a trash rack... rack, fish screen, and closure gate; (7) an approximately 0.1-acre impoundment created by the Kelley...

  7. Development of uniform standards for allowable lane closure : final report, September 2008.

    DOT National Transportation Integrated Search

    2008-09-01

    Procedures for determining allowable lane closure hours to perform maintenance, construction, resurfacing, regional permit and major access permit work on the state highway system were evaluated. The current process involves the collection of traffic...

  8. 40 CFR 265.228 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... detection system in accordance with §§ 264.221(c)(2)(iv) and (3) of this chapter and 265.226(b) and comply with all other applicable leak detection system requirements of this part; (3) Maintain and monitor the... or operator must: (1) Remove or decontaminate all waste residues, contaminated containment system...

  9. 40 CFR 264.151 - Wording of the instruments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance for closure or post-closure care is demonstrated through the financial test specified in subpart H... parts 264 and 265. The current closure and/or post-closure cost estimates covered by such a test are... CFR parts 264 and 265. The current closure and/or post-closure cost estimate covered by the test are...

  10. 40 CFR 264.151 - Wording of the instruments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... assurance for closure or post-closure care is demonstrated through the financial test specified in subpart H... parts 264 and 265. The current closure and/or post-closure cost estimates covered by such a test are... CFR parts 264 and 265. The current closure and/or post-closure cost estimate covered by the test are...

  11. 40 CFR 264.151 - Wording of the instruments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... assurance for closure or post-closure care is demonstrated through the financial test specified in subpart H... parts 264 and 265. The current closure and/or post-closure cost estimates covered by such a test are... CFR parts 264 and 265. The current closure and/or post-closure cost estimate covered by the test are...

  12. 40 CFR 261.151 - Wording of the instruments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assurance for closure or post-closure care is demonstrated through the financial test specified in subpart H... parts 264 and 265. The current closure and/or post-closure cost estimates covered by such a test are... financial test specified in subpart H of 40 CFR parts 264 and 265. The current closure and/or post-closure...

  13. 100-D Ponds closure plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petersen, S.W.

    1997-09-01

    The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit ismore » clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure.« less

  14. 40 CFR 264.144 - Cost estimate for post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 264.145. For owners or operators using the financial test or corporate guarantee, the post-closure... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Cost estimate for post-closure care... FACILITIES Financial Requirements § 264.144 Cost estimate for post-closure care. (a) The owner or operator of...

  15. 40 CFR 264.144 - Cost estimate for post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 264.145. For owners or operators using the financial test or corporate guarantee, the post-closure... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Cost estimate for post-closure care... FACILITIES Financial Requirements § 264.144 Cost estimate for post-closure care. (a) The owner or operator of...

  16. 40 CFR 264.144 - Cost estimate for post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 264.145. For owners or operators using the financial test or corporate guarantee, the post-closure... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Cost estimate for post-closure care... FACILITIES Financial Requirements § 264.144 Cost estimate for post-closure care. (a) The owner or operator of...

  17. 40 CFR 264.144 - Cost estimate for post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 264.145. For owners or operators using the financial test or corporate guarantee, the post-closure... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Cost estimate for post-closure care... FACILITIES Financial Requirements § 264.144 Cost estimate for post-closure care. (a) The owner or operator of...

  18. 40 CFR 264.145 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in accordance with § 264.145(i). (f) Financial test and corporate guarantee for post-closure care. (1... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Financial assurance for post-closure... DISPOSAL FACILITIES Financial Requirements § 264.145 Financial assurance for post-closure care. The owner...

  19. 40 CFR 264.145 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in accordance with § 264.145(i). (f) Financial test and corporate guarantee for post-closure care. (1... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Financial assurance for post-closure... DISPOSAL FACILITIES Financial Requirements § 264.145 Financial assurance for post-closure care. The owner...

  20. 40 CFR 264.145 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... in accordance with § 264.145(i). (f) Financial test and corporate guarantee for post-closure care. (1... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Financial assurance for post-closure... DISPOSAL FACILITIES Financial Requirements § 264.145 Financial assurance for post-closure care. The owner...

  1. 40 CFR 264.145 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in accordance with § 264.145(i). (f) Financial test and corporate guarantee for post-closure care. (1... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Financial assurance for post-closure... DISPOSAL FACILITIES Financial Requirements § 264.145 Financial assurance for post-closure care. The owner...

  2. 40 CFR 264.145 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in accordance with § 264.145(i). (f) Financial test and corporate guarantee for post-closure care. (1... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Financial assurance for post-closure... DISPOSAL FACILITIES Financial Requirements § 264.145 Financial assurance for post-closure care. The owner...

  3. 40 CFR 258.72 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... care. 258.72 Section 258.72 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... dollars, of the cost of hiring a third party to conduct post-closure care for the MSWLF unit in compliance with the post-closure plan developed under § 258.61 of this part. The post-closure cost estimate used...

  4. RCRA, superfund and EPCRA hotline training module. Introduction to: Land disposal units (40 cfr parts 264/265, subparts k, l, m, n) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module provides an overview of the requirements for landfills, surface impoundments, waste piles, and land treatment units. It summarizes the differences between interim status (Part 265) and permitted (Part 264) standards for land disposal units. It defines `surface impoundment` and distinguishes surface impoundments from tanks and describes surface impoundment retrofitting and retrofitting variance procedures. It explains the connection between land disposal standards, post-closure, and groundwater monitoring.

  5. Hanford Facility Dangerous Waste Closure Plan - Plutonium Finishing Plant Treatment Unit Glovebox HA-20MB

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PRIGNANO, A.L.

    2003-06-25

    This closure plan describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) glovebox HA-20MB that housed an interim status ''Resource Conservation and Recovery Act'' (RCRA) of 1976 treatment unit. This closure plan is certified and submitted to Ecology for incorporation into the Hanford Facility RCRA Permit (HF RCRA Permit) in accordance with Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement; TPA) Milestone M-83-30 requiring submittal of a certified closure plan for ''glovebox HA-20MB'' by July 31, 2003. Glovebox HA-20MB is located within the 231-5Z Building in the 200 West Area of the Hanford Facility.more » Currently glovebox HA-20MB is being used for non-RCRA analytical purposes. The schedule of closure activities under this plan supports completion of TPA Milestone M-83-44 to deactivate and prepare for dismantlement the above grade portions of the 234-5Z and ZA, 243-Z, and 291-Z and 291-Z-1 stack buildings by September 30, 2015. Under this closure plan, glovebox HA-20MB will undergo clean closure to the performance standards of Washington Administrative Code (WAC) 173-303-610 with respect to all dangerous waste contamination from glovebox HA-20MB RCRA operations. Because the intention is to clean close the PFP treatment unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. Any information on radionuclides is provided only for general knowledge. Clearance form only sent to RHA.« less

  6. 40 CFR 265.145 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of this section in accordance with § 265.145(h). (e) Financial test and corporate guarantee for post... closure and post-closure cost estimates to be covered by the test; (iv) Specify the date ending the owner... Regional Administrator may approve a decrease in the current post-closure cost estimate for which this test...

  7. 40 CFR 265.145 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of this section in accordance with § 265.145(h). (e) Financial test and corporate guarantee for post... closure and post-closure cost estimates to be covered by the test; (iv) Specify the date ending the owner... Regional Administrator may approve a decrease in the current post-closure cost estimate for which this test...

  8. 40 CFR 265.145 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of this section in accordance with § 265.145(h). (e) Financial test and corporate guarantee for post... closure and post-closure cost estimates to be covered by the test; (iv) Specify the date ending the owner... Regional Administrator may approve a decrease in the current post-closure cost estimate for which this test...

  9. 40 CFR 265.145 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of this section in accordance with § 265.145(h). (e) Financial test and corporate guarantee for post... closure and post-closure cost estimates to be covered by the test; (iv) Specify the date ending the owner... Regional Administrator may approve a decrease in the current post-closure cost estimate for which this test...

  10. 40 CFR 265.145 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of this section in accordance with § 265.145(h). (e) Financial test and corporate guarantee for post... closure and post-closure cost estimates to be covered by the test; (iv) Specify the date ending the owner... Regional Administrator may approve a decrease in the current post-closure cost estimate for which this test...

  11. Environmental Assessment for the Closure of the High-Level Waste Tanks in F- & H-Areas at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    1996-07-31

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the closure of 51 high-level radioactive waste tanks and tank farm ancillary equipment (including transfer lines, evaporators, filters, pumps, etc) at the Savannah River Site (SRS) located near Aiken, South Carolina. The waste tanks are located in the F- and H-Areas of SRS and vary in capacity from 2,839,059 liters (750,000 gallons) to 4,921,035 liters (1,300,000 gallons). These in-ground tanks are surrounded by soil to provide shielding. The F- and H-Area High-Level Waste Tanks are operated under the authoritymore » of Industrial Wastewater Permits No.17,424-IW; No.14520, and No.14338 issued by the South Carolina Department of Health and Environmental Control (SCDHEC). In accordance with the Permit requirements, DOE has prepared a Closure Plan (DOE, 1996) and submitted it to SCDHEC for approval. The Closure Plan identifies all applicable or relevant and appropriate regulations, statutes, and DOE Orders for closing systems operated under the Industrial Wastewater Permits. When approved by SCDHEC, the Closure Plan will present the regulatory process for closing all of the F- and H-Area High Level Waste Tanks. The Closure Plan establishes performance objectives or criteria to be met prior to closing any tank, group of tanks, or ancillary tank farm equipment. The proposed action is to remove the residual wastes from the tanks and to fill the tanks with a material to prevent future collapse and bind up residual waste, to lower human health risks, and to increase safety in and around the tanks. If required, an engineered cap consisting of clay, backfill (soil), and vegetation as the final layer to prevent erosion would be applied over the tanks. The selection of tank system closure method will be evaluated against the following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) criteria described in 40 CFR 300.430(e)(9): ( 1) overall protection of human health and the environment; (2) compliance with applicable or relevant and appropriated requirement: (ARARs); (3) long-term effectiveness and permanence; (4) reduction of toxicity, mobility, or volume through treatment; (5) short-term effectiveness; (6) implementability; (7) cost; (8) state acceptable; and (9) community acceptance. Closure of each tank involves two separate operations after bulk waste removal has been accomplished: (1) cleaning of the tank (i.e., removing the residual contaminants), and (2) the actual closure or filling of the tank with an inert material, (e.g., grout). This process would continue until all the tanks and ancillary equipment and systems have been closed. This is expected to be about year 2028 for Type I, II, and IV tanks and associated systems. Subsequent to that, Type III tanks and systems will be closed.« less

  12. 50 CFR 648.161 - Closures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Bluefish Fishery § 648.161 Closures. (a) EEZ closure. NMFS shall close the EEZ to fishing for bluefish by... dealer permit holders that no commercial quota is available for landing bluefish in that state. ...

  13. 10 CFR 61.29 - Post-closure observation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Post-closure observation and maintenance. 61.29 Section 61.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.29 Post-closure observation and maintenance. Following completion of closure...

  14. 10 CFR 61.29 - Post-closure observation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Post-closure observation and maintenance. 61.29 Section 61.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.29 Post-closure observation and maintenance. Following completion of closure...

  15. 10 CFR 61.29 - Post-closure observation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Post-closure observation and maintenance. 61.29 Section 61.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.29 Post-closure observation and maintenance. Following completion of closure...

  16. 10 CFR 61.29 - Post-closure observation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Post-closure observation and maintenance. 61.29 Section 61.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.29 Post-closure observation and maintenance. Following completion of closure...

  17. 10 CFR 61.29 - Post-closure observation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Post-closure observation and maintenance. 61.29 Section 61.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.29 Post-closure observation and maintenance. Following completion of closure...

  18. 40 CFR 265.117 - Post-closure care and use of property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 265.117 Section 265.117 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID.... (a)(1) Post-closure care for each hazardous waste management unit subject to the requirements of... this part. (2) Any time preceding closure of a hazardous waste management unit subject to post-closure...

  19. 40 CFR 267.143 - Financial assurance for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Financial assurance for closure. 267... PERMIT Financial Requirements § 267.143 Financial assurance for closure. The owner or operator must establish financial assurance for closure of each storage or treatment unit that he owns or operates. In...

  20. 40 CFR 264.280 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 264.280 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264.280 Closure and post-closure care. (a) During the closure period the owner or...

  1. 40 CFR 264.280 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 264.280 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264.280 Closure and post-closure care. (a) During the closure period the owner or...

  2. 40 CFR 264.280 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Section 264.280 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264.280 Closure and post-closure care. (a) During the closure period the owner or...

  3. 40 CFR 264.280 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 264.280 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Land Treatment § 264.280 Closure and post-closure care. (a) During the closure period the owner or...

  4. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  5. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  6. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  7. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  8. Online Work Force Analyzes Social Media to Identify Consequences of an Unplanned School Closure - Using Technology to Prepare for the Next Pandemic.

    PubMed

    Rainey, Jeanette J; Kenney, Jasmine; Wilburn, Ben; Putman, Ami; Zheteyeva, Yenlik; O'Sullivan, Megan

    During an influenza pandemic, the United States Centers for Disease Control and Prevention (CDC) may recommend school closures. These closures could have unintended consequences for students and their families. Publicly available social media could be analyzed to identify the consequences of an unplanned school closure. As a proxy for an unplanned, pandemic-related school closure, we used the district-wide school closure due to the September 10-18, 2012 teachers' strike in Chicago, Illinois. We captured social media posts about the school closure using the Radian6 social media-monitoring platform. An online workforce from Amazon Mechanical Turk categorized each post into one of two groups. The first group included relevant posts that described the impact of the closure on students and their families. The second group included irrelevant posts that described the political aspects of the strike or topics unrelated to the school closure. All relevant posts were further categorized as expressing a positive, negative, or neutral sentiment. We analyzed patterns of relevant posts and sentiment over time and compared our findings to household surveys conducted after other unplanned school closures. We captured 4,546 social media posts about the district-wide school closure using our search criteria. Of these, 930 (20%) were categorized as relevant by the online workforce. Of the relevant posts, 619 (67%) expressed a negative sentiment, 51 (5%) expressed a positive sentiment, and 260 (28%) were neutral. The number of relevant posts, and especially those with a negative sentiment, peaked on day 1 of the strike. Negative sentiment expressed concerns about childcare, missed school lunches, and the lack of class time for students. This was consistent with findings from previously conducted household surveys. Social media are publicly available and can readily provide information on the impact of an unplanned school closure on students and their families. Using social media to assess the impact of an unplanned school closure due to a public health event would be informative. An online workforce can effectively assist with the review process.

  9. Online Work Force Analyzes Social Media to Identify Consequences of an Unplanned School Closure – Using Technology to Prepare for the Next Pandemic

    PubMed Central

    Rainey, Jeanette J.; Kenney, Jasmine; Wilburn, Ben; Putman, Ami; Zheteyeva, Yenlik; O’Sullivan, Megan

    2016-01-01

    Background During an influenza pandemic, the United States Centers for Disease Control and Prevention (CDC) may recommend school closures. These closures could have unintended consequences for students and their families. Publicly available social media could be analyzed to identify the consequences of an unplanned school closure. Methods As a proxy for an unplanned, pandemic-related school closure, we used the district-wide school closure due to the September 10–18, 2012 teachers’ strike in Chicago, Illinois. We captured social media posts about the school closure using the Radian6 social media-monitoring platform. An online workforce from Amazon Mechanical Turk categorized each post into one of two groups. The first group included relevant posts that described the impact of the closure on students and their families. The second group included irrelevant posts that described the political aspects of the strike or topics unrelated to the school closure. All relevant posts were further categorized as expressing a positive, negative, or neutral sentiment. We analyzed patterns of relevant posts and sentiment over time and compared our findings to household surveys conducted after other unplanned school closures. Results We captured 4,546 social media posts about the district-wide school closure using our search criteria. Of these, 930 (20%) were categorized as relevant by the online workforce. Of the relevant posts, 619 (67%) expressed a negative sentiment, 51 (5%) expressed a positive sentiment, and 260 (28%) were neutral. The number of relevant posts, and especially those with a negative sentiment, peaked on day 1 of the strike. Negative sentiment expressed concerns about childcare, missed school lunches, and the lack of class time for students. This was consistent with findings from previously conducted household surveys. Conclusion Social media are publicly available and can readily provide information on the impact of an unplanned school closure on students and their families. Using social media to assess the impact of an unplanned school closure due to a public health event would be informative. An online workforce can effectively assist with the review process. PMID:27655229

  10. 300 Area process trench sediment analysis report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimmerman, M.G.; Kossik, C.D.

    1987-12-01

    This report describes the results of a sampling program for the sediments underlying the Process Trenches serving the 300 Area on the Hanford reservation. These Process Trenches were the subject of a Closure Plan submitted to the Washington State Department of Ecology and to the US Environmental Protection Agency in lieu of a Part B permit application on November 8, 1985. The closure plan described a proposed sampling plan for the underlying sediments and potential remedial actions to be determined by the sample analyses results. The results and proposed remedial action plan are presented and discussed in this report. 50more » refs., 6 figs., 8 tabs.« less

  11. 40 CFR 265.144 - Cost estimate for post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... comply with § 265.145. For owners or operators using the financial test or corporate guarantee, the post... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Cost estimate for post-closure care..., STORAGE, AND DISPOSAL FACILITIES Financial Requirements § 265.144 Cost estimate for post-closure care. (a...

  12. 40 CFR 265.144 - Cost estimate for post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... comply with § 265.145. For owners or operators using the financial test or corporate guarantee, the post... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Cost estimate for post-closure care..., STORAGE, AND DISPOSAL FACILITIES Financial Requirements § 265.144 Cost estimate for post-closure care. (a...

  13. 40 CFR 265.144 - Cost estimate for post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... comply with § 265.145. For owners or operators using the financial test or corporate guarantee, the post... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Cost estimate for post-closure care..., STORAGE, AND DISPOSAL FACILITIES Financial Requirements § 265.144 Cost estimate for post-closure care. (a...

  14. 40 CFR 265.144 - Cost estimate for post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... comply with § 265.145. For owners or operators using the financial test or corporate guarantee, the post... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Cost estimate for post-closure care..., STORAGE, AND DISPOSAL FACILITIES Financial Requirements § 265.144 Cost estimate for post-closure care. (a...

  15. 40 CFR 265.144 - Cost estimate for post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... comply with § 265.145. For owners or operators using the financial test or corporate guarantee, the post... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Cost estimate for post-closure care..., STORAGE, AND DISPOSAL FACILITIES Financial Requirements § 265.144 Cost estimate for post-closure care. (a...

  16. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... post-closure care. (a) At closure of a magazine or unit which stored hazardous waste under this subpart... estimates for closure, and financial responsibility for magazines or units must meet all of the requirements... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  17. 40 CFR 264.258 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Waste Piles § 264.258 Closure and post-closure care. (a) At closure, the owner or operator must remove... that apply to landfills (§ 264.310). (c)(1) The owner or operator of a waste pile that does not comply...(c) or § 264.251(b), must: (i) Include in the closure plan for the pile under § 264.112 both a plan...

  18. Evaluation of left ventricular function by tissue Doppler and speckle-derived strain rate echocardiography after percutaneous ductus closure.

    PubMed

    Amoogzar, Hamid; Shakiba, Ali Mohammad; Derakhshan, Dorna; Ajami, Gholamhossein; Cheriki, Sirous; Borzouee, Mohammad; Edraki, Mohammad Reza; Mehdizadegan, Nima

    2015-01-01

    The aim of this study was to evaluate the left ventricular systolic and diastolic function before and after transcatheter percutaneous patent ductus arteriosus (PDA) closure. 21 children (age >6 months old) diagnosed with hemodynamically significant PDA underwent percutaneous PDA closure. Conventional, Doppler and tissue Doppler imaging and speckled-derived strain rate echocardiography were done at pre-closure, 1 day (early) and 1 month (late) post-closure. Mean age of the patients (female/male: 1.3) was 17.54 ± 24.7 months with the mean PDA diameter of 3.6 ± 0.8 mm. Systolic measures (ejection fraction, shortening fraction) reduced significantly early after PDA closure (P < 0.05). After 1 month, both improved significantly; ultimately, after 1 month no change was observed in systolic function measures compared with the pre-closure status. Early and late diastolic flow velocities of mitral (E M and A M) reduced considerably in early and late post-closure time (P < 0.05). Both early tissue Doppler early velocity of lateral mitral annulus (E'M) and early to late velocity ratio (E'M/A'M) of lateral mitral annulus decreased significantly (P = 0.02) in early post-closure. After 1 month, E'M increased considerably. (P = 0.01) but E'M/A'M had an insignificant rise (P > 0.05). E M/E'M ratio did not change in early post-closure but it had a considerable reduction in the subsequent month compared with the pre- and early post-closure (P < 0.001 for both occasions). Global and segmental longitudinal strain measures reduced significantly early after PDA closure (P < 0.05) but it improved remarkably in the subsequent month. Transcatheter PDA closure causes a significant decrease in left ventricular performance early after PDA closure which recovers completely within 1 month. Also PDA size can affect post-closure left ventricular function.

  19. Scalp Wound Closure with K wires: An alternative easier method to scalp wound closure.

    PubMed

    Ramesh, S; Ajik, S

    2012-12-01

    Scalp defects and lacerations present a reconstructive challenge to plastic surgeons. Many methods have been described from the use of skin grafting to rotation flaps. Here we present a method of closure of a contaminated scalp wound with the use of Kirschner wires. In our case, closure of scalp laceration was made possible with the use of 1.4 Kirschner wires and cable tie/ zip tie fasteners. The duration to closure of wound was 10 days. In reconstructing the scalp defect, this method was found to adhere to principles of scalp reconstruction. There were no post operative complications found from the procedure. On initial application on the edge of the wound, tension applied caused the K wires to cut through the wound edge. On replacement of K wires 1cm away from wound edge the procedure was not plagued by any further complication. In conclusion we find scalp closure with Kirschner wires are a simple and effective method for scalp wound closure.

  20. 40 CFR 264.120 - Certification of completion of post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... certification that the post-closure care period for the hazardous waste disposal unit was performed in...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... later than 60 days after completion of the established post-closure care period for each hazardous waste...

  1. 75 FR 71427 - Clean River Power 12, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ..., reinforced concrete diversion weir on Ruth Creek; (2) a 45-foot-long, 15-foot-wide, 12-foot-high reinforced concrete intake structure adjacent to the weir with a trash rack, fish screen, and closure gate; (3) a 0.1... penstock from the intake structure to the powerhouse; (5) a 60-foot-long, 40-foot-wide reinforced concrete...

  2. 40 CFR 258.72 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... care. 258.72 Section 258.72 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... assurance for post-closure care. (a) The owner or operator must have a detailed written estimate, in current dollars, of the cost of hiring a third party to conduct post-closure care for the MSWLF unit in compliance...

  3. Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less

  4. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less

  5. Percutaneous closure of atrial septal defects leads to normalisation of atrial and ventricular volumes

    PubMed Central

    Teo, Karen SL; Dundon, Benjamin K; Molaee, Payman; Williams, Kerry F; Carbone, Angelo; Brown, Michael A; Worthley, Matthew I; Disney, Patrick J; Sanders, Prashanthan; Worthley, Stephen G

    2008-01-01

    Background Percutaneous closure of atrial septal defects (ASDs) should potentially reduce right heart volumes by removing left-to-right shunting. Due to ventricular interdependence, this may be associated with impaired left ventricular filling and potentially function. Furthermore, atrial changes post-ASD closure have been poorly understood and may be important for understanding risk of atrial arrhythmia post-ASD closure. Cardiovascular magnetic resonance (CMR) is an accurate and reproducible imaging modality for the assessment of cardiac function and volumes. We assessed cardiac volumes pre- and post-percutaneous ASD closure using CMR. Methods Consecutive patients (n = 23) underwent CMR pre- and 6 months post-ASD closure. Steady state free precession cine CMR was performed using contiguous slices in both short and long axis views through the ASD. Data was collected for assessment of left and right atrial, ventricular end diastolic volumes (EDV) and end systolic volumes (ESV). Data is presented as mean ± SD, volumes as mL, and paired t-testing performed between groups. Statistical significance was taken as p < 0.05. Results There was a significant reduction in right ventricular volumes at 6 months post-ASD closure (RVEDV: 208.7 ± 76.7 vs. 140.6 ± 60.4 mL, p < 0.0001) and RVEF was significantly increased (RVEF 35.5 ± 15.5 vs. 42.0 ± 15.2%, p = 0.025). There was a significant increase in the left ventricular volumes (LVEDV 84.8 ± 32.3 vs. 106.3 ± 38.1 mL, p = 0.003 and LVESV 37.4 ± 20.9 vs. 46.8 ± 18.5 mL, p = 0.016). However, there was no significant difference in LVEF and LV mass post-ASD closure. There was a significant reduction in right atrial volumes at 6 months post-ASD closure (pre-closure 110.5 ± 55.7 vs. post-closure 90.7 ± 69.3 mL, p = 0.019). Although there was a trend to a decrease in left atrial volumes post-ASD closure, this was not statistically significant (84.5 ± 34.8 mL to 81.8 ± 44.2 mL, p = NS). Conclusion ASD closure leads to normalisation of ventricular volumes and also a reduction in right atrial volume. Further follow-up is required to assess how this predicts outcomes such as risk of atrial arrhythmias after such procedures. PMID:19040763

  6. 40 CFR 267.142 - Cost estimate for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure...) The owner or operator must keep the following at the facility during the operating life of the... PERMIT Financial Requirements § 267.142 Cost estimate for closure. (a) The owner or operator must have at...

  7. 40 CFR 267.142 - Cost estimate for closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that on-site disposal capacity will exist at all times over the life of the facility. (3) The closure...) The owner or operator must keep the following at the facility during the operating life of the... PERMIT Financial Requirements § 267.142 Cost estimate for closure. (a) The owner or operator must have at...

  8. To amend title 39, United States Code, to provide that the procedures governing the closure or consolidation of postal branches and stations shall be the same as those applicable in the case of post offices.

    THOMAS, 111th Congress

    Rep. Sestak, Joe [D-PA-7

    2010-02-04

    House - 05/25/2010 Referred to the Subcommittee on Federal Workforce, Post Office, and the District of Columbia. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  9. 40 CFR 265.146 - Use of a mechanism for financial assurance of both closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Use of a mechanism for financial... OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Financial Requirements § 265.146 Use of a mechanism for financial assurance of both closure and post-closure care. An owner or operator...

  10. Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. B. Campbell

    2002-09-01

    The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Testmore » Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.« less

  11. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the wastes, application of advanced technology, or alternative disposal, treatment, or re-use.... 265.118 Section 265.118 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT...

  12. 50 CFR 665.252 - Harvest limitation program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Grounds for Permit Area 1 will be set annually for the calendar year and shall: (1) Apply to the total... the overall harvest guideline for Crustacean Permit Area 1 will be reached; (ii) Closure date after... Permit Area 1 is prohibited by any permitted vessel that is not operating a VMS unit certified by NMFS...

  13. 50 CFR 665.252 - Harvest limitation program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Grounds for Permit Area 1 will be set annually for the calendar year and shall: (1) Apply to the total... the overall harvest guideline for Crustacean Permit Area 1 will be reached; (ii) Closure date after... Permit Area 1 is prohibited by any permitted vessel that is not operating a VMS unit certified by NMFS...

  14. 50 CFR 665.252 - Harvest limitation program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Grounds for Permit Area 1 will be set annually for the calendar year and shall: (1) Apply to the total... the overall harvest guideline for Crustacean Permit Area 1 will be reached; (ii) Closure date after... Permit Area 1 is prohibited by any permitted vessel that is not operating a VMS unit certified by NMFS...

  15. 40 CFR 158.250 - Experimental use permit data requirements for human exposure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 25 2012-07-01 2012-07-01 false Experimental use permit data requirements for human exposure. 158.250 Section 158.250 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for human exposure. No data for applicator exposure and post...

  16. 40 CFR 158.250 - Experimental use permit data requirements for human exposure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Experimental use permit data requirements for human exposure. 158.250 Section 158.250 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for human exposure. No data for applicator exposure and post...

  17. 40 CFR 158.250 - Experimental use permit data requirements for human exposure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 25 2013-07-01 2013-07-01 false Experimental use permit data requirements for human exposure. 158.250 Section 158.250 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for human exposure. No data for applicator exposure and post...

  18. 40 CFR 158.250 - Experimental use permit data requirements for human exposure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 24 2014-07-01 2014-07-01 false Experimental use permit data requirements for human exposure. 158.250 Section 158.250 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for human exposure. No data for applicator exposure and post...

  19. Percutaneous device closure of atrial septal defect results in very early and sustained changes of right and left heart function.

    PubMed

    Monfredi, Oliver; Luckie, Matthew; Mirjafari, Hoda; Willard, Terence; Buckley, Helen; Griffiths, Linda; Clarke, Bernard; Mahadevan, Vaikom S

    2013-08-20

    To investigate the echocardiographic effects of percutaneous closure of secundum atrial septal defect (ASD) in adults and assess which pre-closure parameters predict good response to closure. ASD is a common congenital heart disease often undiscovered until adulthood. ASD closure has been revolutionized by the use of percutaneous devices. The effects of these procedures on echocardiographic parameters are not well characterized. Patients undergoing percutaneous device closure of ASD between June 2007 and June 2009 had 3 sequential echocardiograms reviewed: pre-procedure, immediate post-procedure (24 hours) and 6-8 weeks post-procedure. Significant changes from baseline were investigated using paired t-test/1-way ANOVA. Pearson correlation (2-tailed) tests were used to categorize patients as 'good responders' to closure in terms of selected parameters. 129 echocardiograms in 43 consecutive patients were included. Remodeling of both ventricles occurred immediately following ASD closure and was sustained. Right ventricular (RV) diameter in diastole decreased by 13.5% and 19.3% compared to baseline at 24 hours and 6-8 weeks post-closure, respectively (p<0.05); Left ventricular (LV) diameter in diastole increased by 8.5% and 15.6%, respectively (p<0.05). Functional parameters of the RV also demonstrated early and sustained decreases (TAPSE decreased by 8.3% and 17% compared to baseline at 24 hours and 6-8 weeks post-closure, respectively (p<0.05)). Smaller RV baseline diameter appeared to predict good response to closure. Percutaneous ASD closure has immediate, sustained benefits on multiple echocardiographic parameters. Good responders have smaller RV at baseline, suggesting early closure is preferable. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  20. Suitable closure for post-duodenal endoscopic resection taking medical costs into consideration

    PubMed Central

    Mori, Hirohito; Ayaki, Maki; Kobara, Hideki; Fujihara, Shintaro; Nishiyama, Noriko; Matsunaga, Tae; Yachida, Tatsuo; Masaki, Tsutomu

    2015-01-01

    AIM: To compare closure methods, closure times and medical costs between two groups of patients who had post-endoscopic resection (ER) artificial ulcer floor closures. METHODS: Nineteen patients with duodenal adenoma, early duodenal cancer, and subepithelial tumors that received ER between September 2009 and September 2014 at Kagawa University Hospital and Ehime Rosai Hospital, an affiliated hospital of Kagawa University, were included in the study. We retrospectively compared two groups of patients who received post-ER artificial ulcer floor closure: the conventional clip group vs the over-the-scope clip (OTSC) group. Delayed bleeding, procedure time of closure, delayed perforation, total number of conventional clips and OTSCs and medical costs were analyzed. RESULTS: Although we observed delayed bleeding in three patients in the conventional clip group, we observed no delayed bleeding in the OTSC group (P = 0.049). We did not observe perforation in either group. The mean procedure times for ulcer closure were 33.26 ± 12.57 min and 9.71 ± 2.92 min, respectively (P = 0.0001). The resection diameters were 18.8 ± 1.30 mm and 22.9 ± 1.21 mm for the conventional clip group and the OTSC group, respectively, with significant difference (P = 0.039). As for medical costs, the costs of all conventional clips were USD $1257 and the costs of OTSCs were $7850 (P = 0.005). If the post-ER ulcer is under 20 mm in diameter, a conventional clip closure may be more suitable with regard to the prevention of delayed perforation and to medical costs. CONCLUSION: If the post-ER ulcer is over 20 mm, the OTSC closure should be selected with regard to safety and reliable closure even if there are high medical costs. PMID:25954101

  1. Suitable closure for post-duodenal endoscopic resection taking medical costs into consideration.

    PubMed

    Mori, Hirohito; Ayaki, Maki; Kobara, Hideki; Fujihara, Shintaro; Nishiyama, Noriko; Matsunaga, Tae; Yachida, Tatsuo; Masaki, Tsutomu

    2015-05-07

    To compare closure methods, closure times and medical costs between two groups of patients who had post-endoscopic resection (ER) artificial ulcer floor closures. Nineteen patients with duodenal adenoma, early duodenal cancer, and subepithelial tumors that received ER between September 2009 and September 2014 at Kagawa University Hospital and Ehime Rosai Hospital, an affiliated hospital of Kagawa University, were included in the study. We retrospectively compared two groups of patients who received post-ER artificial ulcer floor closure: the conventional clip group vs the over-the-scope clip (OTSC) group. Delayed bleeding, procedure time of closure, delayed perforation, total number of conventional clips and OTSCs and medical costs were analyzed. Although we observed delayed bleeding in three patients in the conventional clip group, we observed no delayed bleeding in the OTSC group (P = 0.049). We did not observe perforation in either group. The mean procedure times for ulcer closure were 33.26 ± 12.57 min and 9.71 ± 2.92 min, respectively (P = 0.0001). The resection diameters were 18.8 ± 1.30 mm and 22.9 ± 1.21 mm for the conventional clip group and the OTSC group, respectively, with significant difference (P = 0.039). As for medical costs, the costs of all conventional clips were USD $1257 and the costs of OTSCs were $7850 (P = 0.005). If the post-ER ulcer is under 20 mm in diameter, a conventional clip closure may be more suitable with regard to the prevention of delayed perforation and to medical costs. If the post-ER ulcer is over 20 mm, the OTSC closure should be selected with regard to safety and reliable closure even if there are high medical costs.

  2. 40 CFR 264.117 - Post-closure care and use of property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 264.117 Section 264.117 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... for each hazardous waste management unit subject to the requirements of §§ 264.117 through 264.120... preceding partial closure of a hazardous waste management unit subject to post-closure care requirements or...

  3. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.; Lantow, Tiffany A.

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.« less

  4. Validation of a physically based catchment model for application in post-closure radiological safety assessments of deep geological repositories for solid radioactive wastes.

    PubMed

    Thorne, M C; Degnan, P; Ewen, J; Parkin, G

    2000-12-01

    The physically based river catchment modelling system SHETRAN incorporates components representing water flow, sediment transport and radionuclide transport both in solution and bound to sediments. The system has been applied to simulate hypothetical future catchments in the context of post-closure radiological safety assessments of a potential site for a deep geological disposal facility for intermediate and certain low-level radioactive wastes at Sellafield, west Cumbria. In order to have confidence in the application of SHETRAN for this purpose, various blind validation studies have been undertaken. In earlier studies, the validation was undertaken against uncertainty bounds in model output predictions set by the modelling team on the basis of how well they expected the model to perform. However, validation can also be carried out with bounds set on the basis of how well the model is required to perform in order to constitute a useful assessment tool. Herein, such an assessment-based validation exercise is reported. This exercise related to a field plot experiment conducted at Calder Hollow, west Cumbria, in which the migration of strontium and lanthanum in subsurface Quaternary deposits was studied on a length scale of a few metres. Blind predictions of tracer migration were compared with experimental results using bounds set by a small group of assessment experts independent of the modelling team. Overall, the SHETRAN system performed well, failing only two out of seven of the imposed tests. Furthermore, of the five tests that were not failed, three were positively passed even when a pessimistic view was taken as to how measurement errors should be taken into account. It is concluded that the SHETRAN system, which is still being developed further, is a powerful tool for application in post-closure radiological safety assessments.

  5. Amchitka Mud Pit Sites 2006 Post-Closure Monitoring and Inspection Report, Amchitka Island, Alaska, Rev. No.: 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2006-09-01

    In 2001, the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA/NSO) remediated six areas associated with Amchitka mud pit release sites located on Amchitka Island, Alaska. This included the construction of seven closure caps. To ensure the integrity and effectiveness of remedial action, the mud pit sites are to be inspected every five years as part of DOE's long-term monitoring and surveillance program. In August of 2006, the closure caps were inspected in accordance with the ''Post-Closure Monitoring and Inspection Plan for Amchitka Island Mud Pit Release Sites'' (Rev. 0, November 2005). This post-closure monitoring report provides themore » 2006 cap inspection results.« less

  6. Acute and long-term ocular effects of acrolein vapor on the eyes and potential therapies.

    PubMed

    Dachir, Shlomit; Cohen, Maayan; Gutman, Hila; Cohen, Liat; Buch, Hillel; Kadar, Tamar

    2015-01-01

    Acrolein is a potent irritant and a vesicant that was used by the French during WWI as the warfare agent named: "papite". Nowadays, it is produced in large amounts all over the world in the industry for the production of acrylic acid and for agriculture use as herbicide. The aim of this study was to characterize the effects of acute eye exposure to acrolein vapor and to evaluate the efficacy of a topical post-exposure combination treatment with a local anesthetic and a steroid. Rabbit eyes were exposed to three doses of acrolein vapor (low, intermediate and high) and treated topically with either 0.4% benoxinate hydrochloride (localin, for 2 h) or dexamethasone (dexamycin, for 6 days) or a combination of both drugs. Clinical follow-up using slit lamp examinations and histological evaluation was performed 4 weeks post-exposure. Acrolein vapor caused immediate eye closure with excess tearing, corneal erosions and severe inflammation of the anterior chamber. This was followed by corneal neovascularization (NV) starting as early as 1 week post-exposure. The damage to the eyes was long lasting, and at 4 weeks following exposure, significant pathological changes were observed. Immediate post-exposure application of the local anesthetic, localin, prevented the eye closure, and the dexamycin treatment reduced significantly the initial inflammation as well as the extent and incidence of corneal NV. Short-term eye exposure to the irritant acrolein may result in immediate eye closure and long lasting pathologies that could lead to blindness. An anti-inflammatory treatment combined with short-term application of a local anesthetic prevents incapacitation and might minimize significantly the extent of eye injuries.

  7. Transcatheter closure of post-operative residual ventricular septal defect using a patent ductus arteriosus closure device in an adult: a case report.

    PubMed

    Djer, Mulyadi M; Idris, Nikmah S; Alwi, Idrus; Wijaya, Ika P

    2014-07-01

    Transcatheter closure of perimembranous and muscular ventricular septal defect (VSD) has been performed widely and it has more advantages compare to surgery. However, transcatheter closure of residual VSD post operation of complex congenital heart disease is still challenging because of the complexity of anatomy and concern about device stability, so the operator should meticulously choose the most appropriate technique and device. We would like to report a case of transcatheter closure of residual VSD post Rastelli operation in a patient with double outlet right ventricle (DORV), sub-aortic VSD, severe infundibulum pulmonary stenosis (PS) and single coronary artery. The patient had undergone operations for four times, but he still had intractable heart failure that did not response to medications. On the first attempt. we closed the VSD using a VSD occluder, unfortunately the device embolized into the descending aorta, but fortunately we was able to snare it out. Then we decided to close the VSD using a patent ductus arteriosus (PDA occluder). On transesophageal echocardiography (TEE) and angiography evaluation, the device position was stable. Post transcatheter VSD closure, the patient clinical condition improved significantly and he could finally be discharged after a long post-surgery hospitalization. Based on this experience we concluded that the transcatheter closure of residual VSD in complex CHD using PDA occluder could be an effective alternative treatment.

  8. 43 CFR 423.21 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... laws and regulations, as well as notices and postings of closed and special use areas established by an... with limitations, restrictions, closures, or special use areas applicable to the use of any device... responsible for the use and treatment of Reclamation facilities, lands, and waterbodies, and the cultural...

  9. Transcatheter closure, mini-invasive closure and open-heart surgical repair for treatment of perimembranous ventricular septal defects in children: a protocol for a network meta-analysis.

    PubMed

    You, Tao; Yi, Kang; Ding, Zhao-Hong; Hou, Xiao-Dong; Liu, Xing-Guang; Wang, Xin-Kuan; Ge, Long; Tian, Jin-Hui

    2017-06-21

    Both transcatheter device closure and surgical repair are effective treatments with excellent midterm outcomes for perimembranous ventricular septal defects (pmVSDs) in children. The mini-invasive periventricular device occlusion technique has become prevalent in research and application, but evidence is limited for the assessment of transcatheter closure, mini-invasive closure and open-heart surgical repair. This study comprehensively compares the efficacy, safety and costs of transcatheter closure, mini-invasive closure and open-heart surgical repair for treatment of pmVSDs in children using Bayesian network meta-analysis. A systematic search will be performed using Chinese Biomedical Literature Database, China National Knowledge Infrastructure, PubMed, EMBASE.com and the Cochrane Central Register of Controlled Trials to include random controlled trials, prospective or retrospective cohort studies comparing the efficacy, safety and costs of transcatheter closure, mini-invasive closure and open-heart surgical repair. The risk of bias for the included prospective or retrospective cohort studies will be evaluated according to the risk of bias in non-randomised studies of interventions (ROBINS-I). For random controlled trials, we will use risk of bias tool from Cochrane Handbook version 5.1.0. A Bayesian network meta-analysis will be conducted using R-3.3.2 software. Ethical approval and patient consent are not required since this study is a network meta-analysis based on published trials. The results of this network meta-analysis will be submitted to a peer-reviewed journal for publication. CRD42016053352. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  10. Sweat collection capsule

    NASA Technical Reports Server (NTRS)

    Greenleaf, J. E.; Delaplaine, R. W. (Inventor)

    1980-01-01

    A sweat collection capsule permitting quantitative collection of sweat is described. The device consists of a frame held immobile on the skin, a closure secured to the frame and absorbent material located next to the skin in a cavity formed by the frame and the closure. The absorbent material may be removed from the device by removing the closure from the frame while the frame is held immobile on the skin.

  11. 78 FR 10163 - Notice of Availability of Draft Section 3116 Basis for Determination for Closure of H Tank Farm...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... isolation in a deep geologic repository for spent fuel or high-level radioactive waste; (2) has had highly... in 10 CFR Part 61, Subpart C and pursuant to a State approved closure plan or State-issued permit; or... with the performance objectives of 10 CFR Part 61, Subpart C; pursuant to a State approved closure plan...

  12. Pre/post-closure assessment of groundwater pharmaceutical fate in a wastewater-facility-impacted stream reach.

    PubMed

    Bradley, Paul M; Barber, Larry B; Clark, Jimmy M; Duris, Joseph W; Foreman, William T; Furlong, Edward T; Givens, Carrie E; Hubbard, Laura E; Hutchinson, Kasey J; Journey, Celeste A; Keefe, Steffanie H; Kolpin, Dana W

    2016-10-15

    Pharmaceutical contamination of contiguous groundwater is a substantial concern in wastewater-impacted streams, due to ubiquity in effluent, high aqueous mobility, designed bioactivity, and to effluent-driven hydraulic gradients. Wastewater treatment facility (WWTF) closures are rare environmental remediation events; offering unique insights into contaminant persistence, long-term wastewater impacts, and ecosystem recovery processes. The USGS conducted a combined pre/post-closure groundwater assessment adjacent to an effluent-impacted reach of Fourmile Creek, Ankeny, Iowa, USA. Higher surface-water concentrations, consistent surface-water to groundwater concentration gradients, and sustained groundwater detections tens of meters from the stream bank demonstrated the importance of WWTF effluent as the source of groundwater pharmaceuticals as well as the persistence of these contaminants under effluent-driven, pre-closure conditions. The number of analytes (110 total) detected in surface water decreased from 69 prior to closure down to 8 in the first post-closure sampling event approximately 30 d later, with a corresponding 2 order of magnitude decrease in the cumulative concentration of detected analytes. Post-closure cumulative concentrations of detected analytes were approximately 5 times higher in proximal groundwater than in surface water. About 40% of the 21 contaminants detected in a downstream groundwater transect immediately before WWTF closure exhibited rapid attenuation with estimated half-lives on the order of a few days; however, a comparable number exhibited no consistent attenuation during the year-long post-closure assessment. The results demonstrate the potential for effluent-impacted shallow groundwater systems to accumulate pharmaceutical contaminants and serve as long-term residual sources, further increasing the risk of adverse ecological effects in groundwater and the near-stream ecosystem. Published by Elsevier B.V.

  13. Pre/post-closure assessment of groundwater pharmaceutical fate in a wastewater‑facility-impacted stream reach

    USGS Publications Warehouse

    Bradley, Paul M.; Barber, Larry B.; Clark, Jimmy M.; Duris, Joseph W.; Foreman, William T.; Furlong, Edward T.; Givens, Carrie E.; Hubbard, Laura E.; Hutchinson, Kasey J.; Journey, Celeste A.; Keefe, Steffanie H.; Kolpin, Dana W.

    2016-01-01

    Pharmaceutical contamination of contiguous groundwater is a substantial concern in wastewater-impacted streams, due to ubiquity in effluent, high aqueous mobility, designed bioactivity, and to effluent-driven hydraulic gradients. Wastewater treatment facility (WWTF) closures are rare environmental remediation events; offering unique insights into contaminant persistence, long-term wastewater impacts, and ecosystem recovery processes. The USGS conducted a combined pre/post-closure groundwater assessment adjacent to an effluent-impacted reach of Fourmile Creek, Ankeny, Iowa, USA. Higher surface-water concentrations, consistent surface-water to groundwater concentration gradients, and sustained groundwater detections tens of meters from the stream bank demonstrated the importance of WWTF effluent as the source of groundwater pharmaceuticals as well as the persistence of these contaminants under effluent-driven, pre-closure conditions. The number of analytes (110 total) detected in surface water decreased from 69 prior to closure down to 8 in the first post-closure sampling event approximately 30 d later, with a corresponding 2 order of magnitude decrease in the cumulative concentration of detected analytes. Post-closure cumulative concentrations of detected analytes were approximately 5 times higher in proximal groundwater than in surface water. About 40% of the 21 contaminants detected in a downstream groundwater transect immediately before WWTF closure exhibited rapid attenuation with estimated half-lives on the order of a few days; however, a comparable number exhibited no consistent attenuation during the year-long post-closure assessment. The results demonstrate the potential for effluent-impacted shallow groundwater systems to accumulate pharmaceutical contaminants and serve as long-term residual sources, further increasing the risk of adverse ecological effects in groundwater and the near-stream ecosystem.

  14. Percutaneous closure of patent ductus arteriosus in children: Immediate and short-term changes in left ventricular systolic and diastolic function.

    PubMed

    Gupta, Saurabh Kumar; Krishnamoorthy, Km; Tharakan, Jaganmohan A; Sivasankaran, S; Sanjay, G; Bijulal, S; Anees, T

    2011-07-01

    To evaluate the effect of percutaneous closure of patent ductus arteriosus (PDA) on left ventricular (LV) systolic and diastolic function in children. Limited studies are available on alteration in LV hemodynamics, especially diastolic function, after PDA closure. Thirty-two consecutive children with isolated PDA treated by trans-catheter closure were studied. The LV systolic and diastolic function were assessed by two-dimensional (2D) echocardiography and tissue Doppler imaging 1 day before the PDA closure, on day 1, and on follow-up. At baseline, none of the patients had LV systolic dysfunction. On day 1 post-PDA closure, 8 (25%) children developed LV systolic dysfunction. The baseline LV ejection fraction (LVEF), LV end-systolic dimension (LVESD), and PDA diastolic gradient predicted the post-closure LVEF. Patients who developed post-closure LV systolic dysfunction had poorer LV diastolic function than those who did not. LV diastolic properties improved after PDA closure; however, the improvement in LV diastolic properties lagged behind the improvement in the LV systolic function. All children were asymptomatic and had normal LVEF on follow up of >3 months. Percutaneous closure of PDA is associated with the reversible LV systolic dysfunction. Improvement in the LV diastolic function lags behind that in the LV systolic function.

  15. 50 CFR 648.101 - Closures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the Summer...) EEZ closure. The Regional Administrator shall close the EEZ to fishing for summer flounder by... notifying vessel and dealer permit holders that no commercial quota is available for landing summer flounder...

  16. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: (i) Changes in operating plans or facility design affect the post-closure plan, or (ii) Events which... operation, or no later than 60 days after an unexpected event has occurred which has affected the post... operation, or no more than 60 days after an unexpected event has occurred which has affected the post...

  17. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...: (i) Changes in operating plans or facility design affect the post-closure plan, or (ii) Events which... operation, or no later than 60 days after an unexpected event has occurred which has affected the post... operation, or no more than 60 days after an unexpected event has occurred which has affected the post...

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, L.L.; Wilson, J.R.; Sanchez, L.C.

    The United States Department of Energy Office of Environmental Management's (DOE/EM's) National Spent Nuclear Fuel Program (NSNFP), through a collaboration between Sandia National Laboratories (SNL) and Idaho National Engineering and Environmental Laboratory (INEEL), is conducting a systematic Nuclear Dynamics Consequence Analysis (NDCA) of the disposal of SNFs in an underground geologic repository sited in unsaturated tuff. This analysis is intended to provide interim guidance to the DOE for the management of the SNF while they prepare for final compliance evaluation. This report presents results from a Nuclear Dynamics Consequence Analysis (NDCA) that examined the potential consequences and risks of criticalitymore » during the long-term disposal of spent nuclear fuel owned by DOE-EM. This analysis investigated the potential of post-closure criticality, the consequences of a criticality excursion, and the probability frequency for post-closure criticality. The results of the NDCA are intended to provide the DOE-EM with a technical basis for measuring risk which can be used for screening arguments to eliminate post-closure criticality FEPs (features, events and processes) from consideration in the compliance assessment because of either low probability or low consequences. This report is composed of an executive summary (Volume 1), the methodology and results of the NDCA (Volume 2), and the applicable appendices (Volume 3).« less

  19. Percutaneous closure of a post-traumatic ventricular septal defect with a patent ductus arteriosus occluder.

    PubMed

    Xi, Er-Ping; Zhu, Jian; Zhu, Shui-Bo; Yin, Gui-Lin; Liu, Yong; Dong, Yong-Qiang; Zhang, Yu; Xia, Feng

    2012-11-01

    Ventricular septal defects resulting from post-traumatic cardiac injury are very rare. Percutaneous closure has emerged as a method for treating this disorder. We wish to report our experience in three patients who underwent percutaneous closure of a post-traumatic ventricular septal defect with a patent ductus arteriosus occluder. We treated three patients with post-traumatic ventricular septal defects caused by stab wounds with knives. After the heart wound was repaired, patient examinations revealed ventricular septal defects with pulmonary/systemic flow ratios (Qp/Qs) of over 1.7. The post-traumatic ventricular septal defects were closed percutaneously with a patent ductus arteriosus occluder (Lifetech Scientific (Shenzhen) Co., LTD, Guangdong, China) utilizing standard techniques. Post-operative transthoracic echocardiography revealed no residual left-to-right shunt and indicated normal ventricular function. In addition, 320-slice computerized tomography showed that the occluder was well placed and exhibited normal morphology. Our experiences indicate that closure of a post-traumatic ventricular septal defect using a patent ductus arteriosus occluder is feasible, safe, and effective.

  20. Percutaneous closure of a post-traumatic ventricular septal defect with a patent ductus arteriosus occluder

    PubMed Central

    Xi, Er-Ping; Zhu, Jian; Zhu, Shui-Bo; Yin, Gui-Lin; Liu, Yong; Dong, Yong-Qiang; Zhang, Yu; Xia, Feng

    2012-01-01

    OBJECTIVE: Ventricular septal defects resulting from post-traumatic cardiac injury are very rare. Percutaneous closure has emerged as a method for treating this disorder. We wish to report our experience in three patients who underwent percutaneous closure of a post-traumatic ventricular septal defect with a patent ductus arteriosus occluder. METHODS: We treated three patients with post-traumatic ventricular septal defects caused by stab wounds with knives. After the heart wound was repaired, patient examinations revealed ventricular septal defects with pulmonary/systemic flow ratios (Qp/Qs) of over 1.7. The post-traumatic ventricular septal defects were closed percutaneously with a patent ductus arteriosus occluder (Lifetech Scientific (Shenzhen) Co., LTD, Guangdong, China) utilizing standard techniques. RESULTS: Post-operative transthoracic echocardiography revealed no residual left-to-right shunt and indicated normal ventricular function. In addition, 320-slice computerized tomography showed that the occluder was well placed and exhibited normal morphology. CONCLUSION: Our experiences indicate that closure of a post-traumatic ventricular septal defect using a patent ductus arteriosus occluder is feasible, safe, and effective. PMID:23184204

  1. Complete closure of artificial gastric ulcer after endoscopic submucosal dissection by combined use of a single over-the-scope clip and through-the-scope clips (with videos).

    PubMed

    Maekawa, Satoshi; Nomura, Ryosuke; Murase, Takayuki; Ann, Yasuyoshi; Harada, Masaru

    2015-02-01

    A 5-7 day hospital stay is usually needed after endoscopic submucosal dissection (ESD) of gastric tumor because of the possibility of delayed perforation or bleeding. The aim of this study was to evaluate the efficacy of combined use of a single over-the-scope clip (OTSC) and through-the-scope clips (TTSCs) to achieve complete closure of artificial gastric ulcer after ESD. We prospectively studied 12 patients with early gastric cancer or gastric adenoma. We performed complete closure of post-ESD artificial gastric ulcer using a combination of a single OTSC and TTSCs. Mean size of post-ESD artificial ulcer was 54.6 mm. The mean operating time for the closure procedure was 15.2 min., and the success rate was 91.7 % (11/12). Patients who underwent complete closure of post-ESD artificial gastric ulcer could be discharged the day after ESD and the closing procedure. Complete closure of post-ESD artificial gastric ulcer using a combination of a single OTSC and TTSCs is useful for shortening the period of hospitalization and reducing treatment cost.

  2. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...

  3. 40 CFR 265.118 - Post-closure plan; amendment of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...

  4. 50 CFR 622.43 - Closures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the Gulf EEZ or South Atlantic EEZ is prohibited. (3) King and Spanish mackerel. The closure provisions of this paragraph (a)(3) do not apply to Atlantic migratory group Spanish mackerel, which are... this section. (i) A person aboard a vessel for which a commercial permit for king or Spanish mackerel...

  5. 43 CFR 423.14 - How will Reclamation post and delineate closed areas at the site of the closure?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... closed areas at the site of the closure? 423.14 Section 423.14 Public Lands: Interior Regulations... RECLAMATION FACILITIES, LANDS, AND WATERBODIES Areas Open and Closed to Public Use § 423.14 How will Reclamation post and delineate closed areas at the site of the closure? Before or at the time of closing all...

  6. Design, permitting, and construction issues associated with closure of the Panna Maria uranium tailings impoundment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strachan, C.L.; Raabe, K.L.

    1997-12-31

    In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designedmore » for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment.« less

  7. 76 FR 50728 - Science Advisory Board Staff Office; Notification of Public Teleconferences of the Science...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... advisory report related to uranium and thorium in-situ leach recovery and post-closure stability monitoring... . Technical Contact: Technical background information pertaining to the Uranium In-Situ leach recovery--Post... entitled ``Considerations Related to Post-Closure Monitoring of Uranium In-Situ Leach/In-Situ Recovery (ISL...

  8. Primary closure versus delayed closure for non bite traumatic wounds within 24 hours post injury.

    PubMed

    Eliya-Masamba, Martha C; Banda, Grace W

    2013-10-22

    Acute traumatic wounds are one of the common reasons why people present to the emergency department. Primary closure has traditionally been reserved for traumatic wounds presenting within six hours of injury and considered 'clean' by the attending surgeon, with the rest undergoing delayed primary closure as a means of controlling wound infection. Primary closure has the potential benefit of rapid wound healing but poses the potential threat of increased wound infection. There is currently no evidence to guide clinical decision-making on the best timing for closure of traumatic wounds. To determine the effect on time to healing of primary closure versus delayed closure for non bite traumatic wounds presenting within 24 hours post injury. To explore the adverse effects of primary closure compared with delayed closure for non bite traumatic wounds presenting within 24 hours post injury. In May 2013, for this first update we searched the Cochrane Wounds Group Specialised Register; the Cochrane Central Register of Controlled Trials (CENTRAL) (The Cochrane Library); Ovid MEDLINE; Ovid MEDLINE (In-Process & Other Non-Indexed Citations); Ovid EMBASE; and EBSCO CINAHL. There were no restrictions with respect to language, date of publication or study setting. Randomised controlled trials comparing primary closure with delayed closure of non bite traumatic wounds. Two review authors independently evaluated the results of the searches against the inclusion criteria. No studies met the inclusion criteria for this review. Since no studies met the inclusion criteria, neither a meta-analysis nor a narrative description of studies was possible. There is currently no systematic evidence to guide clinical decision-making regarding the timing for closure of traumatic wounds. There is a need for robust research to investigate the effect of primary closure compared with delayed closure for non bite traumatic wounds presenting within 24 hours of injury.

  9. 50 CFR 679.22 - Closures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 11 2011-10-01 2011-10-01 false Closures. 679.22 Section 679.22 Wildlife... any fishing year, vessels with a Federal fisheries permit under § 679.4 are prohibited in that part of... Conservation Zone. Trawling is prohibited at all times in the area defined in Figure 10 to this part as the...

  10. 77 FR 65279 - Domestic Competitive Products Pricing and Mailing Standards Changes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... applicable mailpiece is presented at a retail location without postage validation imprint (PVI) capability... Permit Imprint, in its entirety. Renumber 1.4 through 1.6 as 1.3 through 1.5.] * * * * * [Delete... Permit Imprint, in their entirety.] * * * * * 155 Mail Preparation 1.0 Preparation for Parcel Post 1.1...

  11. A Prospective Randomized Clinical Study of the Influence of Primary Closure or Dressing on Post-operative Morbidity after Mandibular Third Molar Surgery

    PubMed Central

    Egbor, Peter E; Saheeb, Birch D

    2014-01-01

    Objective: The aim of the following study is to determine the effect of primary closure or dressing on post-operative morbidity after impacted lower third molar surgery. Materials and Methods: This was a randomized clinical study of 72 patients who had surgical extraction of impacted mandibular third molars. The subjects were divided into two groups of A and B. Group A had total closure (primary closure) and Group B had whitehead varnish dressing of the socket. Pain, swelling and trismus were evaluated pre-operatively using visual analogue scale, flexible tape measuring method and inter-incisal distance measurement with Vernier Callipers respectively as well as post-operatively on 1st, 2nd, 3rd, 5th and 7th day. Results: The study participants consisted of 27 males and 45 females in a ratio 1:1.7. With a mean age of 24.7 ± 4.9 years (range 19-33 years) for Group A and 25.5 ± 4.3 years (range 20-39 years) for Group B. Post-operative pain was not significantly affected by the closure techniques (P > 0.05). Dressing was found to significantly reduce the degree of swelling and trismus peaking on the 2nd day (P = 0.0207 and P = 0.010 respectively). Conclusion: The use of dressing was more effective than primary closure to reduce the degree of swelling and trismus though its effect on post-operative pain reduction was not significant. PMID:25191094

  12. 40 CFR 264.197 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 264.197 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... as hazardous waste, unless § 261.3(d) of this chapter applies. The closure plan, closure activities...

  13. Nuclear Dynamics Consequence Analysis (NDCA) for the Disposal of Spent Nuclear Fuel in an Underground Geologic Repository--Volume 2: Methodology and Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, L.L.; Wilson, J.R.; Sanchez, L.C.

    1998-10-01

    The US Department of Energy Office of Environmental Management's (DOE/EM's) National Spent Nuclear Fuel Program (NSNFP), through a collaboration between Sandia National Laboratories (SNL) and Idaho National Engineering and Environmental Laboratory (INEEL), is conducting a systematic Nuclear Dynamics Consequence Analysis (NDCA) of the disposal of SNFs in an underground geologic repository sited in unsaturated tuff. This analysis is intended to provide interim guidance to the DOE for the management of the SNF while they prepare for final compliance evaluation. This report presents results from a Nuclear Dynamics Consequence Analysis (NDCA) that examined the potential consequences and risks of criticality duringmore » the long-term disposal of spent nuclear fuel owned by DOE-EM. This analysis investigated the potential of post-closure criticality, the consequences of a criticality excursion, and the probability frequency for post-closure criticality. The results of the NDCA are intended to provide the DOE-EM with a technical basis for measuring risk which can be used for screening arguments to eliminate post-closure criticality FEPs (features, events and processes) from consideration in the compliance assessment because of either low probability or low consequences. This report is composed of an executive summary (Volume 1), the methodology and results of the NDCA (Volume 2), and the applicable appendices (Volume 3).« less

  14. Mechanical Performance of Nail-Laminated Posts Manufactured from Reclaimed Chromated Copper Arsenate-Treated Decking Lumber

    Treesearch

    John J. Janowiak; Robert H. Falk; Brad A. Gething; John A. Tsirigotis

    2014-01-01

    This study determined the mechanical properties of nail-laminated (nail-lam) posts manufactured from reclaimed chromated copper arsenate (CCA)–treated decking lumber. Though CCA-treated lumber is no longer accepted for use in residential applications, it is permitted in agricultural and industrial applications where health and environmental impacts are deemed to be...

  15. A computer analysis of reflex eyelid motion in normal subjects and in facial neuropathy.

    PubMed

    Somia, N N; Rash, G S; Epstein, E E; Wachowiak, M; Sundine, M J; Stremel, R W; Barker, J H; Gossman, D

    2000-12-01

    To demonstrate how computerized eyelid motion analysis can quantify the human reflex blink. Seventeen normal subjects and 10 patients with unilateral facial nerve paralysis were analyzed. Eyelid closure is currently evaluated by systems primarily designed to assess lower/midfacial movements. The methods are subjective, difficult to reproduce, and measure only volitional closure. Reflex closure is responsible for eye hydration, and its evaluation demands dynamic analysis. A 60Hz video camera incorporated into a helmet was used to analyze blinking. Reflective markers on the forehead and eyelids allowed for the dynamic measurement of the reflex blink. Eyelid displacement, velocity and acceleration were calculated. The degree of synchrony between bilateral blinks was also determined. This study demonstrates that video motion analysis can describe normal and altered eyelid motions in a quantifiable manner. To our knowledge, this is the first study to measure dynamic reflex blinks. Eyelid closure may now be evaluated in kinematic terms. This technique could increase understanding of eyelid motion and permit more accurate evaluation of eyelid function. Dynamic eyelid evaluation has immediate applications in the treatment of facial palsy affecting the reflex blink. Relevance No method has been developed that objectively quantifies dynamic eyelid closure. Methods currently in use evaluate only volitional eyelid closure, and are based on direct and indirect observer assessments. These methods are subjective and are incapable of analyzing dynamic eyelid movements, which are critical to maintenance of corneal hydration and comfort. A system that quantifies eyelid kinematics can provide a functional analysis of blink disorders and an objective evaluation of their treatment(s).

  16. 'Song of Life': music therapy in terminally ill patients with cancer.

    PubMed

    Warth, Marco; Kessler, Jens; van Kampen, Josien; Ditzen, Beate; Bardenheuer, Hubert J

    2018-06-01

    Music therapy (MT) holds a promising potential to meet emotional and existential needs in palliative care patients. The aim of the present pilot study was to assess the feasibility, acceptance and potential effectiveness of a novel MT intervention to improve life closure and spiritual well-being of terminally ill patients with cancer receiving palliative care. The 'Song of Life' (SOL) intervention was provided on two consecutive sessions containing a biographical interview and a live performance of a song with high biographical relevance to the patient in a lullaby style. Pre-to-post intervention assessments comprised brief self-report measures on life closure, well-being, stress, worry and pain. 13 out of 15 patients were able to complete the protocol as intended. The chosen songs were associated with a close person, an important place or event or with a religious belief. The results showed medium-sized improvements with regard to life closure, well-being, relaxation, worry and pain. 'SOL' proved to be a feasible and highly accepted intervention for patients approaching the end of their lives. Further consideration with regard to the procedures and outcomes is necessary before implementation of a randomised trial. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  17. Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2003

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    This post-closure inspection report provides documentation of the semiannual inspection activities, maintenance and repair activities, and conclusions and recommendations for calendar year 2003 for eight corrective action units located on the Tonopah Test Range, Nevada.

  18. 76 FR 36918 - Science Advisory Board Staff Office; Notification of a Public Teleconference and Meeting of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... of EPA's Draft Technical Report Pertaining to Uranium and Thorium In-Situ Leach Recovery and Post... Related to Post-Closure Monitoring of Uranium In-Situ Leach/In-Situ Recovery (ISL/ISR) Sites.'' DATES: The... pertaining to Uranium In-Situ Leach Recovery--Post-Closure Stability Monitoring can be found at http://www...

  19. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Petrello, Jaclyn

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.« less

  20. 40 CFR 264.603 - Post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Post-closure care. 264.603 Section 264.603 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... treatment or storage unit has contaminated soils or ground water that cannot be completely removed or...

  1. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  2. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  3. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  4. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  5. Post-establishment fertilization of Minnesota hybrid poplar plantations

    Treesearch

    Mark Coleman; David Tolsted; Tom Nichols; Wendell D. Johnson; Edward G. Wene; Tom Houghtaling

    2006-01-01

    Experimental plantings were installed at five sites in three locations in western Minnesota. Aboveground biomass production increased 43–82% as a result of three annual applications of urea or balanced nutrient blend fertilizer beginning near canopy closure. There were no production differences between the type of fertilizer used, indicating that N was the major...

  6. 40 CFR 239.6 - Permitting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CFR part 257, subpart B or 40 CFR part 258 federal revised criteria. (e) For municipal solid waste... solid waste landfill units shall have a permit incorporating the conditions identified in paragraph (e... solid waste landfill units which achieve compliance with 40 CFR part 258, subpart E; (vi) Closure and...

  7. 40 CFR 239.6 - Permitting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CFR part 257, subpart B or 40 CFR part 258 federal revised criteria. (e) For municipal solid waste... solid waste landfill units shall have a permit incorporating the conditions identified in paragraph (e... solid waste landfill units which achieve compliance with 40 CFR part 258, subpart E; (vi) Closure and...

  8. 40 CFR 239.6 - Permitting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CFR part 257, subpart B or 40 CFR part 258 federal revised criteria. (e) For municipal solid waste... solid waste landfill units shall have a permit incorporating the conditions identified in paragraph (e... solid waste landfill units which achieve compliance with 40 CFR part 258, subpart E; (vi) Closure and...

  9. H-Area Seepage Basins groundwater monitoring report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    During fourth quarter 1992, the groundwater at the H-Area Seepage Basins (HASB) was monitored in compliance with South Carolina Hazardous Waste Management Regulations, R61-79.265, Subpart F. Samples were collected from 130 wells that monitor the three separate hydrostratigraphic units that make up the uppermost aquifer beneath the HASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B Post-Closure Care Permit Application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control in December 1990. Historically, as well as currently, tritium, nitrate, total alpha-emittingmore » radium, gross alpha, and mercury have been the primary constituents observed above final Primary Drinking Water Standards (PDWS) in groundwater at the HASB. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units during first and fourth quarter 1992. Water-level maps indicate that the groundwater flow rates and directions at the HASB have remained relatively constant since the basins ceased to be active in 1988.« less

  10. H-Area Seepage Basins groundwater monitoring report. Fourth quarter 1992 and 1992 summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    During fourth quarter 1992, the groundwater at the H-Area Seepage Basins (HASB) was monitored in compliance with South Carolina Hazardous Waste Management Regulations, R61-79.265, Subpart F. Samples were collected from 130 wells that monitor the three separate hydrostratigraphic units that make up the uppermost aquifer beneath the HASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B Post-Closure Care Permit Application for the H-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control in December 1990. Historically, as well as currently, tritium, nitrate, total alpha-emittingmore » radium, gross alpha, and mercury have been the primary constituents observed above final Primary Drinking Water Standards (PDWS) in groundwater at the HASB. Isoconcentration/isoactivity maps included in this report indicate both the concentration/activity and extent of the primary contaminants in each of the three hydrostratigraphic units during first and fourth quarter 1992. Water-level maps indicate that the groundwater flow rates and directions at the HASB have remained relatively constant since the basins ceased to be active in 1988.« less

  11. 40 CFR 265.120 - Certification of completion of post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... each hazardous waste disposal unit, the owner or operator must submit to the Regional Administrator, by registered mail, a certification that the post-closure care period for the hazardous waste disposal unit was...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT...

  12. 40 CFR 71.24 - Permit applications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... end of the post-reduction year. (4) If a source test will be the supporting basis for establishing post-reduction emissions for one or more emissions units in the early reductions source, the test... to the appropriate State agency; to the EPA Emission Standards Division, Mail Drop 13, Research...

  13. 40 CFR 71.24 - Permit applications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... end of the post-reduction year. (4) If a source test will be the supporting basis for establishing post-reduction emissions for one or more emissions units in the early reductions source, the test... to the appropriate State agency; to the EPA Emission Standards Division, Mail Drop 13, Research...

  14. 40 CFR 71.24 - Permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... end of the post-reduction year. (4) If a source test will be the supporting basis for establishing post-reduction emissions for one or more emissions units in the early reductions source, the test... to the appropriate State agency; to the EPA Emission Standards Division, Mail Drop 13, Research...

  15. 40 CFR 71.24 - Permit applications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... end of the post-reduction year. (4) If a source test will be the supporting basis for establishing post-reduction emissions for one or more emissions units in the early reductions source, the test... to the appropriate State agency; to the EPA Emission Standards Division, Mail Drop 13, Research...

  16. 40 CFR 71.24 - Permit applications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... end of the post-reduction year. (4) If a source test will be the supporting basis for establishing post-reduction emissions for one or more emissions units in the early reductions source, the test... to the appropriate State agency; to the EPA Emission Standards Division, Mail Drop 13, Research...

  17. 77 FR 20375 - Notice of Availability of Secretarial Determination and Basis for Determination Under Section...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... that the waste in the FTF: (1) Does not require permanent isolation in a deep geologic repository for... pursuant to a State approved closure plan or State-issued permit; or (3)(B) exceeds concentration limits... 10 CFR part 61, Subpart C; pursuant to a State-approved closure plan or State-issued [[Page 20376...

  18. Role of household factors in parental attitudes to pandemic influenza-related school closure in Japan: a cross-sectional study.

    PubMed

    Uchida, Mitsuo; Kaneko, Minoru; Kawa, Shigeyuki

    2014-10-21

    To investigate how household background factors affect parental behavior during pandemic influenza-related school closures, we determined associations between such factors and three parental attitudes: "caring for the child", "taking leave from work", and "permitting out-of-home activities". A hypothetical pandemic influenza situation was presented and a questionnaire survey among households of 2146 schoolchildren from 6 schools was conducted. Odds ratios of background factors were estimated using univariate and multivariate logistic regression models. Responses pertaining to 1510 children indicated that junior high school (OR = 0.11), both parents working (OR = 0.03), and family including grandparent(s) or other relatives (OR = 7.50) were factors associated with "caring for the child", and elementary school (OR = 2.28), special education school (OR = 3.18), and both parents working (OR = 5.74) were associated with "taking leave from work". Having an older sibling (OR = 0.74) and awareness of the technical term for school closure (OR = 0.73) were factors associated with "permitting out-of-home activities". Not only work status but also other household factors may be associated with parental behaviors during pandemic influenza-related school closures.

  19. Post-traumatic female urethral reconstruction.

    PubMed

    Blaivas, Jerry G; Purohit, Rajveer S

    2008-09-01

    Post-traumatic urethral damage resulting in urethrovaginal fistulas or strictures, though rare, should be suspected in patients who have unexpected urinary incontinence or lower urinary tract symptoms after pelvic surgery, pelvic fracture, a long-term indwelling urethral catheter, or pelvic radiation. Careful physical examination and cystourethroscopy are critical to diagnose and assess the extent of the fistula. A concomitant vesicovaginal or ureterovaginal fistula should also be ruled out. The two main indications for reconstruction are sphincteric incontinence and urethral obstruction. Surgical correction intends to create a continent urethra that permits volitional, painless, and unobstructed passage of urine. An autologous pubovaginal sling, with or without a Martius flap at time of reconstruction, should be considered. The three approaches to urethral reconstruction are anterior bladder flaps, posterior bladder flaps, and vaginal wall flaps. We believe vaginal flaps are usually the best option. Options for vaginal repair of fistula include primary closure, peninsula flaps, bilateral labial pedicle flaps, and labial island flaps. Outcomes are optimized by using exacting surgical principles during repair and careful postoperative management by an experienced reconstructive surgeon.

  20. 75 FR 21039 - Notice of Temporary Road Closure of Coal Pit Spring-Cave Gulch Road (6287-0-B0), Within the Cave...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-22

    ... stabilization. The BLM posted signs at main entry points to the temporary closure area. Maps of the closed roads...; HAG10-0046] Notice of Temporary Road Closure of Coal Pit Spring--Cave Gulch Road (6287-0-B0), Within the... closure. SUMMARY: Notice is hereby given that a temporary road closure to public access, use, or occupancy...

  1. Evidence for pre-Taconic metamorphism in the Potomac terrane, Maryland and Virginia: Hornblende and Muscovite [sup 40]Ar/[sup 39]Ar results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Becker, J.L.; Wintsch, R.P.; Kunk, M.J.

    1993-03-01

    New [sup 40]Ar/[sup 39]Ar age spectra of hornblende and white mica from the Great Falls area of the Potomac terrane of Maryland and Virginia indicate pre-Taconic metamorphism. Age spectra of hornblende samples are interpreted to represent cooling from peak metamorphic conditions through their closure temperatures for argon diffusion ([approximately]500C) at about 490 Ma. These older Ordovician postmetamorphic cooling ages strongly contrast with younger post-Ordovician metamorphic cooling ages now being reported in the Blue Ridge and Goochland terranes to the west and east respectively. A late phyllitic sheen observed on rocks in the field and petrographic observations of undulose plagioclase andmore » amphibole, and older muscovite, and kinked primary muscovite in the Bear Island Granodiorite reflect a younger retrogressive metamorphism involving the growth of secondary muscovite (Fisher's S4 ). [sup 40]Ar/[sup 39]Ar Age spectra of white micas from the Bear Island Granodiorite are complex and probably indicate both primary and secondary white mica, the latter apparently growing below the closure temperature for retention of argon in muscovite ([approximately]350C). The age spectra permit an estimate of a minimum age of 420 Ma for cooling through closure of the older generation of white mica. The above ages of hornblende and muscovite closure imply a minimum cooling rate of [approximately]2C/m.y., and exhumation rate of about 1 mm/yr. The projected time of peak metamorphism at upper amphibolite facies for the Great Falls area clearly predates the Ordovician Taconic orogeny and suggests that these rocks escaped this event and largely escaped younger Paleozoic metamorphic events, which are well documented in adjacent terranes.« less

  2. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence withmore » the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.« less

  3. Performance assessment for low-level waste disposal in the UK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashworth, A.B.

    1995-12-31

    British Nuclear Fuels plc (BNFL) operate a site for the disposal of Low Level Radioactive Waste at Drigg in West Cumbria, in North-West England. HMIP are responsible for the regulation of the site with regard to environmental discharges of radioactive materials, both operational and post-closure. This paper is concerned with post-closure matters only. Two post-closure performance assessments have been carried out for this site: one by the National Radiological Protection Board (NRPB) in 1987; and a subsequent one carried out on behalf of HMIP, completed in 1991. Currently, BNFL are preparing a Safety Case for continued operation of the Driggmore » site, and it expected that the core of this Case will comprise BNFL`s own analysis of post-closure performance. HMIP has developed procedures for the assessment of this Case, based upon experience of the previous Drigg assessments, and also upon the experience of similar work carried out in the assessment of Intermediate Level Waste (ILW) disposal at both deep and shallow potential sites. This paper describes the more important features of these procedures.« less

  4. RCRA, superfund and EPCRA hotline training module. Introduction to: RCRA financial assurance (40 cfr parts 264/265, subpart h) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module addresses financial assurance standards explaining first mechanisms and then the extent of coverage required. It describes the applicability of financial assurance for closure and post-closure and identifies necessary factors for calculating cost estimates. It explains allowable mechanisms for financial assurance, including which mechanisms can be used together and under what conditions. It explains how financial assurance works when a company owns several facilities or when a company is owned by one or more larger companies. It presents the financial assurance requirements for accident liability coverage. It identifies who is subject to sudden versus nonsudden liability provisions and citesmore » applicable definitions. It specifies the amount of liability coverage required for single and multiple facilities. It lists allowable mechanisms and combinations of mechanisms that can be used to satisfy financial assurance liability requirements.« less

  5. Negative pressure wound therapy combined with acoustic pressure wound therapy for infected post surgery wounds: a case series.

    PubMed

    Howell-Taylor, Melania; Hall, Macy G; Brownlee Iii, William J; Taylor, Mary

    2008-09-01

    Acute infection of surgical incision sites often requires specialized wound care in preparation for surgical closure. Optimal therapy for preparing such wounds for a secondary closure procedure remains uncertain. The authors report wound outcomes after administering acoustic pressure wound therapy in conjunction with negative pressure wound therapy with reticulated open-cell foam dressing changes to assist with bacteria removal from open, infected surgical-incision sites in preparation for secondary surgical closure in three patients. Before incorporating acoustic pressure wound therapy at the authors' facility, the average negative pressure wound therapy with reticulated open-cell foam dressing course prior to secondary surgical closure was 30 days; with its addition, two of three patients underwent successful surgical closure with no postoperative complications after 21 and 14 days, respectively; one patient succumbed to nonwound-related complications before wound closure. Larger, prospective studies are needed to evaluate combining negative pressure wound therapy with reticulated open-cell foam dressing and acoustic pressure wound therapy for infected, acute post surgery wounds.

  6. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... closure of a magazine or unit which stored hazardous waste under this subpart, the owner or operator must..., and financial responsibility for magazines or units must meet all of the requirements specified in... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  7. Perineal Hernia Is an Unusual Complication Post Perineal Bladder Neck Closure: A Case Report.

    PubMed

    Omar, Helmy; Helmy, Tamer E; Hafez, Ashraf T; Dawaba, Mohamed E

    2017-03-01

    Bladder neck closure (BNC) is the ultimate bladder neck reconstruction. If reconstruction fails, closure must be considered as it gives the highest continence rate. The vast majority of BNCs are performed through an abdominal approach (either transvesical or extravesical approach), but perineal approach remains an option for BNC with considerable success rate. Perineal hernia, which is defined as protrusion of abdominal contents through the perineal defect, is a very rare complication after urologic procedures. We report a case of perineal hernia post perineal BNC. Copyright © 2016 Elsevier Inc. All rights reserved.

  8. 77 FR 25735 - Notice of Temporary Restriction of Vehicle Use and Closure to Tree Cutting and Wood Harvesting on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    ... soils. Motorized vehicle use within the burn area will be restricted to existing posted roads and two...-08807; MO 4500031135; TAS: 14X1125] Notice of Temporary Restriction of Vehicle Use and Closure to Tree... restricting travel by motorized vehicles to existing posted roads and two-track trails and issuing a [[Page...

  9. 40 CFR 264.111 - Closure performance standard.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... eliminates, to the extent necessary to protect human health and the environment, post-closure escape of hazardous waste, hazardous constituents, leachate, contaminated run-off, or hazardous waste decomposition...

  10. 40 CFR 265.111 - Closure performance standard.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Controls, minimizes or eliminates, to the extent necessary to protect human health and the environment, post-closure escape of hazardous waste, hazardous constituents, leachate, contaminated run-off, or...

  11. Device for temporarily closing duct-formers in well completion apparatus

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zandmer, H.M.; Zandmer, S.M.

    A duct-forming device is disclosed for use in a well completion apparatus of the kind, wherein a bore hole casing is positioned in a bore hole and duct-forming devices of alkali- and acid resistant metal-such as steel-are secured at spaced levels to the casing in alignment with holes machined in the casing wall. In accordance with the invention, a closure device is arranged within the duct-forming device which permits flow of predetermined amounts of liquid, such as acid, from the interior of the casing through the duct-forming device and into the producing formation, while gradually being moved by the liquidmore » into a position in which such fluid flow is prevented. After the fluid flow has been stopped by the closure device and when the formation pressure exceeds the pressure within the duct-forming device and the casing, fluid from the formation then forces the closure device toward and into the casing space to permit thereafter free flow of formation fluid into the duct-forming device and the casing or of pressurized treatment liquid from the casing into the formation. The inventive arrangement permits inter alia the establishment of a sufficient and substantially uniform feeding rate of treatment liquid, such as acid, from the casing into the producing formation through all the duct-formers in preparation for subsequent acidification or other treatments, such as sand fracking.« less

  12. A method for independent modelling in support of regulatory review of dose assessments.

    PubMed

    Dverstorp, Björn; Xu, Shulan

    2017-11-01

    Several countries consider geological disposal facilities as the preferred option for spent nuclear fuel due to their potential to provide isolation from the surface environment on very long timescales. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a spent nuclear fuel repository. The disposal method involves disposing spent fuel in copper canisters with a cast iron insert at about 500 m depth in crystalline basement rock, and each canister is surrounded by a buffer of swelling bentonite clay. SKB's license application is supported by a post-closure safety assessment, SR-Site. SR-Site has been reviewed by the Swedish Radiation Safety Authority (SSM) for five years. The main method for review of SKB's license application is document review, which is carried out by SSM's staff and supported by SSM's external experts. The review has proven a challenging task due to its broad scope, complexity and multidisciplinary nature. SSM and its predecessors have, for several decades, been developing independent models to support regulatory reviews of post-closure safety assessments for geological repositories. For the review of SR-Site, SSM has developed a modelling approach with a structured application of independent modelling activities, including replication modelling, use of alternative conceptual models and bounding calculations, to complement the traditional document review. This paper describes this scheme and its application to biosphere and dose assessment modelling. SSM's independent modelling has provided important insights regarding quality and reasonableness of SKB's rather complex biosphere modelling and has helped quantifying conservatisms and highlighting conceptual uncertainty. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspectionmore » plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.« less

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klein, Thomas; Patterson, Russell; Camphouse, Chris

    There are two primary regulatory requirements for Panel Closures at the Waste Isolation Pilot Plant (WIPP), the nation's only deep geologic repository for defense related Transuranic (TRU) and Mixed TRU waste. The Federal requirement is through 40 CFR 191 and 194, promulgated by the U.S. Environmental Protection Agency (EPA). The state requirement is regulated through the authority of the Secretary of the New Mexico Environment Department (NMED) under the New Mexico Hazardous Waste Act (HWA), New Mexico Statutes Annotated (NMSA) 1978, chap. 74-4-1 through 74-4-14, in accordance with the New Mexico Hazardous Waste Management Regulations (HWMR), 20.4.1 New Mexico Annotatedmore » Code (NMAC). The state regulations are implemented for the operational period of waste emplacement plus 30 years whereas the federal requirements are implemented from the operational period through 10,000 years. The 10,000 year federal requirement is related to the adequate representation of the panel closures in determining long-term performance of the repository. In Condition 1 of the Final Certification Rulemaking for 40 CFR Part 194, the EPA required a specific design for the panel closure system. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has requested, through the Planned Change Request (PCR) process, that the EPA modify Condition 1 via its rulemaking process. The DOE has also requested, through the Permit Modification Request (PMR) process, that the NMED modify the approved panel closure system specified in Permit Attachment G1. The WIPP facility is carved out of a bedded salt formation 655 meters below the surface of southeast New Mexico. Condition 1 of the Final Certification Rulemaking specifies that the waste panels be closed using Option D which is a combination of a Salado mass concrete (SMC) monolith and an isolation/explosion block wall. The Option D design was also accepted as the panel closure of choice by the NMED. After twelve years of waste handling operations and a greater understanding of the waste and the behavior of the underground salt formation, the DOE has established a revised panel closure design. This revised design meets both the short-term NMED Permit requirements for the operational period, and also the Federal requirements for long-term repository performance. This new design is simpler, easier to construct and has less of an adverse impact on waste disposal operations than the originally approved Option D design. The Panel Closure Redesign is based on: (1) the results of in-situ constructability testing performed to determine run-of-mine salt reconsolidation parameters and how the characteristics of the bedded salt formation affect these parameters and, (2) the results of air flow analysis of the new design to determine that the limit for the migration of Volatile Organic Compounds (VOCs) will be met at the compliance point. Waste panel closures comprise a repository feature that has been represented in WIPP performance assessment (PA) since the original Compliance Certification Application of 1996. Panel closures are included in WIPP PA models principally because they are a part of the disposal system, not because they play a substantive role in inhibiting the release of radionuclides to the outside environment. The 1998 rulemaking that certified WIPP to receive transuranic waste placed conditions on the panel closure design to be implemented in the repository. The revised panel closure design, termed the Run-of-Mine (ROM) Panel Closure System (ROMPCS), is comprised of 30.48 meters of ROM salt with barriers at each end. The ROM salt is generated from ongoing mining operations at the WIPP and may be compacted and/or moistened as it is emplaced in a panel entry. The barriers consist of bulkheads, similar to those currently used in the panels as room closures. A WIPP performance assessment has been completed that incorporates the ROMPCS design into the representation of the repository, and compares repository performance to that achieved with the approved Option D design. Several key physical processes and rock mechanics principles are incorporated into the performance assessment. First, creep closure of the salt rock surrounding a panel entry results in consolidation of the ROM salt emplaced in the entry. Eventually, the ROM salt comprising the ROMPCS will approach a condition similar to intact salt. As the ROM salt reaches higher fractional densities during consolidation, back stress will be imposed on the surrounding rock mass leading to eventual healing of the disturbed rock zone above and below the panel closure. Healing of the disturbed rock zone above and below the ROMPCS reduces the porosity and permeability in those areas. Analysis of the new design demonstrates that: (1) the WIPP continues to meet regulatory compliance requirements when the ROMPCS design is implemented instead of Option D, and (2) there is no impact on the short-term effectiveness of the panel closure to limit the concentration of VOCs at the WIPP site boundary to a fraction of the health-based exposure limits (HBLs) during the operational period. (authors)« less

  15. Eddy Covariance Measurements Over a Maize Field: The Contribution of Minor Flux Terms to the Energy Balance Gap

    NASA Astrophysics Data System (ADS)

    Smidt, J.; Ingwersen, J.; Streck, T.

    2015-12-01

    The lack of energy balance closure is a long-standing problem in eddy covariance (EC) measurements. The energy balance equation is defined as Rn - G = H + λE, where Rn is net radiation, G is the ground heat flux, H is the sensible heat flux and λE is the latent heat flux. In most cases of energy imbalance, either Rn is overestimated or the ground heat and turbulent fluxes are underestimated. Multiple studies have shown that calculations, incorrect instrument installation/calibration and measurement errors alone do not entirely account for this imbalance. Rather, research is now focused on previously neglected sources of heat storage in the soil, biomass and air beneath the EC station. This project examined the potential of five "minor flux terms" - soil heat storage, biomass heat storage, energy consumption by photosynthesis, air heat storage and atmospheric moisture change, to further close the energy balance gap. Eddy covariance measurements were conducted at a maize (Zea mays) field in southwest Germany during summer 2014. Soil heat storage was measured for six weeks at 11 sites around the field footprint. Biomass and air heat storage were measured for six subsequent weeks at seven sites around the field footprint. Energy consumption by photosynthesis was calculated using the CO2 flux data. Evapotranspiration was calculated using the water balance method and then compared to the flux data processed with three post-closure methods: the sensible heat flux, the latent heat flux and the Bowen ratio post-closure methods. An energy balance closure of 66% was achieved by the EC station measurements over the entire investigation period. During the soil heat flux campaign, EC station closure was 74.1%, and the field footprint soil heat storage contributed 3.3% additional closure. During the second minor flux term measurement period, closure with the EC station data was 91%. Biomass heat storage resulted in 1.1% additional closure, the photosynthesis flux closed the gap by an additional 7.8%, air heat storage closure was -0.3% and atmospheric moisture change was negligible with an additional closure of <0.01%. These four terms resulted in a total additional closure of 8.6% over the EC station measurements. The Bowen Ratio post-closure method yielded values most similar to the water balance method over the entire season.

  16. 77 FR 75654 - Notice of Temporary Closures on Public Lands in Owyhee County, ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... signs at main entry points to the closed roads. This closure will be posted in the Boise District BLM... Management, Interior. ACTION: Notice of temporary road closure to motorized vehicle use and temporary area... River Birds of Prey National Conservation Area (NCA-BLM). Two roads will be closed to motorized vehicle...

  17. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designed and constructed to: (1) Provide long-term minimization of migration of liquids through the closed... from eroding or otherwise damaging the final cover; and (5) Protect and maintain surveyed benchmarks...

  18. 40 CFR 265.310 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... designed and constructed to: (1) Provide long-term minimization of migration of liquids through the closed... from eroding or otherwise damaging the final cover; and (5) Protect and maintain surveyed benchmarks...

  19. 40 CFR 264.310 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... settling, subsidence, erosion, or other events; (2) Continue to operate the leachate collection and removal system until leachate is no longer detected; (3) Maintain and monitor the leak detection system in...

  20. 40 CFR 264.310 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... settling, subsidence, erosion, or other events; (2) Continue to operate the leachate collection and removal system until leachate is no longer detected; (3) Maintain and monitor the leak detection system in...

  1. 40 CFR 264.310 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... settling, subsidence, erosion, or other events; (2) Continue to operate the leachate collection and removal system until leachate is no longer detected; (3) Maintain and monitor the leak detection system in...

  2. 40 CFR 264.310 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... settling, subsidence, erosion, or other events; (2) Continue to operate the leachate collection and removal system until leachate is no longer detected; (3) Maintain and monitor the leak detection system in...

  3. 40 CFR 264.310 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... settling, subsidence, erosion, or other events; (2) Continue to operate the leachate collection and removal system until leachate is no longer detected; (3) Maintain and monitor the leak detection system in...

  4. How long will I have my ACE? The natural history of the antegrade continence enema stoma in idiopathic constipation.

    PubMed

    Khoo, A Kate; Askouni, Evita; Basson, Sonia; Ng, Jessica; Cleeve, Stewart

    2017-11-01

    We aim to determine the natural history of the ACE in idiopathic constipation and factors predictive of closure. A retrospective case-note review of all patients undergo ACE formation for idiopathic constipation Jan 2003-Mar 2016. Kaplan-Meier analysis was used to determine ACE survival and Cox's proportional hazard models to examine potential predictors of closure. 29/84 (35%) ACEs were closed: 21/84 due to success and 8/84 due to failure. Median age of closure was 15.5 years (3.5-23.6). Median ACE survival was 77.0 months (95% CI 58.0-96.0). An ACE survival curve was derived from which we estimate that 5-year post-ACE, one-third of patients can expect to have had their ACE closed. Younger age at ACE was predictive of earlier closure (p = 0.023) and closure for success (p < 0.001). Neither patient sex (p = 0.546) nor presence of psychological comorbidities (p = 0.769) predicted likelihood of closure. Incontinence 6-week post-ACE was also associated with increased likelihood of closure (p = 0.042). The ACE survival curve estimates the proportion of patients with idiopathic constipation who can expect closure (either due to success or failure) at certain timepoints. This may be useful for patient counseling. Younger age at ACE was associated with earlier closure (for success).

  5. Resource Conservation and Recovery Act closure report: Area 2 Bitcutter and Postshot Containment Shops Injection Wells, Correction Action Unit 90

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Closure Report provides documentation of the activities conducted during the Resource Conservation and Recovery Act (RCRA) closure of the Bitcutter and Postshot Containment Shops Injection Wells located in Area 2 of the Nevada Test Site (NTS), Oak Spring Quadrangle (USGS, 1986), Township 10 South, Range 53 East, Nye County, Nevada. This report discusses the Bitcutter Shop Inside Injection Well (CAU 90-A) closure-in-place and the Bitcutter Shop Outside Injection Well (CAU 90-B) and Postshot Containment Shop Injection Well (CAU 90-C) clean closures. This Closure Report provides background information about the unit, the results of the characterization activities and actions conductedmore » to determine the closure design. It also provides a discussion of the drainage analysis, preliminary closure activities, final closure activities, waste management activities, and the Post-Closure Care requirements.« less

  6. ECEM (Eye Closure, Eye Movements): application to depersonalization disorder.

    PubMed

    Harriet, E Hollander

    2009-10-01

    Eye Closure, Eye Movements (ECEM) is a hypnotically-based approach to treatment that incorporates eye movements adapted from the Eye Movement Desensitization and Reprocessing (EMDR) protocol in conjunction with hypnosis for the treatment of depersonalization disorder. Depersonalization Disorder has been differentiated from post-traumatic stress disorders and has recently been conceptualized as a subtype of panic disorder (Baker et al., 2003; David, Phillips, Medford, & Sierra, 2004; Segui et. al., 2000). During ECEM, while remaining in a hypnotic state, clients self-generated six to seven trials of eye movements to reduce anticipatory anxiety associated with depersonalization disorder. Eye movements were also used to process triggers that elicited breath holding, often followed by episodes of depersonalization. Hypnotic suggestions were used to reverse core symptoms of depersonalization, subjectively described as "feeling unreal" (Simeon et al., 1997).

  7. Promotion of Wound Healing by an Agonist of Adenosine A2A Receptor Is Dependent on Tissue Plasminogen Activator.

    PubMed

    Montesinos, M Carmen; Desai-Merchant, Avani; Cronstein, Bruce N

    2015-12-01

    Impaired wound healing, as it occurs in diabetes mellitus or long-term corticoid treatment, is commonly associated with disability, diminished quality of life, and high economic costs. Selective agonists of the A2A receptor subtype of adenosine, an endogenous regulator of inflammation, promote tissue repair in animal models, both healthy and with impaired healing. Plasmin-mediated proteolysis of fibrin and other matrix proteins is essential for cell migration at sites of injury. Since adenosine A2A receptor activation increases plasminogen activator release from macrophages and mast cells, we studied the effect of a selective agonist, CGS-21680, on full-thickness excisional wound closure in wild-type, urokinase plasminogen activator (uPA)-deficient, and tissue plasminogen activator (tPA)-deficient mice. Wound closure was impaired in tPA- and uPA-deficient mice as compared with wild-type mice, and topical application of CGS-21680 significantly increased the rate at which wounds closed in wild-type mice and uPA-deficient mice, but not in tPA-deficient mice. Immunostaining of tissue sections showed that tPA was present in endothelial cells and histiocytes by day 3 post-wound and also by day 6. In contrast, uPA was more prominent in these cell types only by day 6 post-wound. Our results confirm that plasminogen activation contributes to wound repair and are consistent with the hypothesis that adenosine A2A receptor activation promotes wound closure by a mechanism that depends upon tPA, but not uPA. Moreover, our results suggest that topical adenosine A2A receptor agonists may be useful in promotion of wound closure in patients with impaired wound healing.

  8. Can post-sternotomy mediastinitis be prevented by a closed incision management system?

    PubMed Central

    Dohmen, Pascal M.; Markou, Thanasie; Ingemansson, Richard; Rotering, Heinrich; Hartman, Jean M.; van Valen, René; Brunott, Maaike; Kramer, Axel; Segers, Patrique

    2014-01-01

    Post-sternotomy mediastinitis is a serious complication after cardiothoracic surgery and contribute significantly to post-operative morbidity, mortality, and healthcare costs. Negative pressure wound therapy is today’s golden standard for post-sternotomy mediastinitis treatment. A systematic literature search was conducted at PubMed until October 2012 to analyse whether vacuum-assisted closure technique prevents mediastinitis after clean surgical incisions closure. Today’s studies showed reduction of post-sternotomy mediastinitis including a beneficial socio-economic impact. Current studies, however included only high-risk patients, hence furthermore, larger randomised controlled trials are warranted to clarify the benefit for using surgical incision vacuum management systems in the general patient population undergoing sternotomy and clarify risk factor interaction. PMID:25285263

  9. Integra™ permits early durable coverage of improvised explosive device (IED) amputation stumps.

    PubMed

    Foong, Deborah P S; Evriviades, Demetrius; Jeffery, Steven L A

    2013-12-01

    Improvised explosive device (IED) blasts cause serious injury. Survivors are left with multiple amputations, considerable soft tissue loss and open fractures with gross contamination. We present our early experience of Integra™ in the acute management of military wounds. The clinical records of all patients with IED injuries who underwent early reconstruction with Integra™ during the six month period between August and December 2009 in our unit were reviewed and data gathered prospectively. There were 7 male soldiers, aged 21-31 years (mean=26). All sustained trunk and limb injuries, including multiple amputations. Number of procedures prior to application of Integra™ was 4-10 (mean=5). Application of Integra™ took place 6-24 days post-injury (mean=13). Size of wounds covered with Integra™ was 1-11.5% TBSA (mean=5%). Anatomical sites reconstructed included amputation stumps, and both upper and lower limbs. There was partial take of Integra in 3 wounds in 2 patients. All wounds were eventually treated with delayed split skin grafting and healed satisfactorily. IEDs produce a large zone of injury with massive soft tissue damage, multiple discontinuous wounds which are significantly contaminated. The physiological insult is equivalent to a large cutaneous burn and there is a paucity of available donor sites. Multiple amputees also have a greater energy and power requirement(1-4) and cannot spare remaining functional muscles as donors. The literature suggests that microvascular flaps have a high failure rate in military patients.(5) Reconstruction began as soon as wounds were considered sufficiently clean. Integra™ was applied with the aim of providing higher quality coverage than that provided by split skin grafting alone (particularly for amputation stumps) whilst minimising operative time and morbidity. Integra™ allows timely closure of battlefield wounds with minimal operative time and morbidity. The procedure can begin whilst still in the acute phase and certainly before one would consider lengthy complex operations such as free flaps. Our experience suggests that Integra™ can allow early closure with robust tissue, promoting early rehabilitation and return to duties. Copyright © 2013 British Association of Plastic, Reconstructive and Aesthetic Surgeons. Published by Elsevier Ltd. All rights reserved.

  10. Transabdominal preperitoneal herniorrhaphy using laser-assisted tissue soldering in a porcine model.

    PubMed

    Lanzafame, Raymond J; Soltz, Barbara A; Stadler, Istvan; Soltz, Robert

    2009-01-01

    Collagen solder is capable of fixation of surgical meshes during laparoscopic herniorrhaphy without compromising tissue integration, increasing adhesions or inflammation. This pilot study describes development of instrumentation and techniques for transabdominal preperitoneal (TAPP) herniorrhaphy using laser-assisted soldering technology. Anesthetized 20-kg to 25-kg female Yorkshire pigs underwent laparoscopy performed using a 3-trocar technique. Peritoneal incisions were made and pockets created in the preperitoneal space for mesh placement. Parietex TEC mesh segments embedded in 60% collagen-solder were soldered to the muscle surface by using a prototype laser (1.45micro, 4.5W CW, 5mm spot, and 55 degrees C set temperature) and custom laparoscopic handpiece. Parietex TEC mesh segments (Control) were affixed to the muscle with fibrin sealant (Tisseel). Peritoneal closure was with staples (Control) or by soldering collagen embedded Vicryl mesh segments over the peritoneal incision (Mesh/TAPP). Segments were inserted using a specially designed introducer. Animals were recovered and underwent second-look laparoscopy at 6 weeks postimplantation. Mesh sites were harvested after animals were euthanized. The mesh-solder constructs were easily inserted and affixed in the TAPP approach. Tisseel tended to drip during application, particularly in vertical and ventral locations. Postoperative healing was similar to Control segments in all cases. Mesh/TAPP closures healed without scarring or adhesion formation. Collagen-based tissue soldering permits normal wound healing and may mitigate or reduce use of staples for laparoscopic mesh fixation and peritoneal closure. Laser-assisted mesh fixation and peritoneal closure is a promising alternative for laparoscopic herniorrhaphy. Further development of this strategy is warranted.

  11. Defense Base Closure and Realignment Commission

    DTIC Science & Technology

    1993-01-01

    during, their training . DLI required Only 803 houising units oii thle Army students inl thle human intelligence field Annex, the post cýxchiaige arid...community also stressed the Navy did not proposes significantly reduccd closure costs by know the true cost of relocating or replicating taking...Warfare Center- Carderock, Annapolis Detachment, The Annapolis community stressed in 1991 theDefense Base Closure and Realignment Coin- Annapolis

  12. Efficacy and Safety of the Over-the-Scope Clip (OTSC) System in the Management of Leak and Fistula After Laparoscopic Sleeve Gastrectomy: a Systematic Review.

    PubMed

    Shoar, Saeed; Poliakin, Lauren; Khorgami, Zhamak; Rubenstein, Rebecca; El-Matbouly, Moamena; Levin, Jun L; Saber, Alan A

    2017-09-01

    Endoscopic management of leaks/fistulas after laparoscopic sleeve gastrectomy (LSG) is gaining popularity in the bariatric surgery. This study aimed to review the efficacy and safety of over-the-scope-clip (OTSC) system in endoscopic closure of post-LSG leak/fistula. PubMed/Medline and major journals of the field were systematically reviewed for studies on endoscopic closure of post-LSG leaks/fistula by means of the OTSC system. A total of ten eligible studies including 195 patients with post-LSG leaks/fistula were identified. The time between LSG and leak/fistula ranged from 1 day to 803 days. Most of the leaks/fistula were located at the proximal staple line, and they sized from 3 to 20 mm. Time between leak diagnosis and OTSC clipping ranged from 0 to 271 days. Thirty-three out of 53 patients (63.5%) required one clip for closure of the lesion. Regarding the OTSC-related complications, a leak occurred in five patients (9.3%) and OTSC migration, stenosis, and tear each in one patient (1.8%). Of the 73 patients with post-LSG leak treated with OTSC, 63 patients had an overall successful closure (86.3%). OTSC system is a promising endoscopic approach for management of post-LSG leaks in appropriately selected patients. Unfortunately, most studies are series with a small sample size, short-term follow-up, and mixed data of concomitant procedures with OTSC. Further studies should distinguish the net efficacy of the OTSC system from other concomitant procedures in treatment of post-LSG leak.

  13. Transcutaneous closure of chronic broncho-pleuro-cutaneous fistula by duct occluder device

    PubMed Central

    Marwah, Vikas; Ravikumar, R; Rajput, Ashok Kumar; Singh, Amandeep

    2016-01-01

    Bronchopleural fistula (BPF) is a well known complication of several pulmonary conditions posing challenging management problem and is often associated with high morbidity and mortality. Though no consensus exists on a definite closure management algorithm, strategies for closure widely include various methods like tube thoracostomy with suction, open surgical closure, bronchoscopy directed glue, coiling and sealants which now also includes use of occlusion devices. We report a case in which a novel method of delivery and closure of recurrent post-operative broncho-pleuro-cutaneous fistula by a duct occluder device was done transcutaneously which has not been previously described in literature. PMID:27051115

  14. 40 CFR 264.111 - Closure performance standard.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 264.111 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... eliminates, to the extent necessary to protect human health and the environment, post-closure escape of...

  15. 40 CFR 264.111 - Closure performance standard.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 264.111 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... eliminates, to the extent necessary to protect human health and the environment, post-closure escape of...

  16. Closure and Post-Closure Care Requirements for Hazardous Waste Treatment, Storage and Disposal Facilities

    EPA Pesticide Factsheets

    When a hazardous waste management unit stops receiving waste at the end of its active life, it must be cleaned up, closed, monitored, and maintained in accordance with the Resource Conservation and Recovery Ac

  17. 40 CFR 265.228 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 265.228 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... or operator must: (1) Remove or decontaminate all waste residues, contaminated containment system...

  18. Post-Closure Inspection Report for the Tonopah Test Range, Nevada: For Calendar Year 2017, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alvarado, Juan; Matthews, Patrick

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). This report covers calendar year 2017 and includes visual inspection and repair activities completed at the following CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 487: Thunderwell Site (TTR) Visual inspections were conducted according to the post-closure plans in the approved closure reportsmore » and subsequent correspondence with the Nevada Division of Environmental Protection. The annual post-closure inspections were conducted on May 23, 2017. No maintenance or repair issues were noted at CAU 400 and CAU 487. Maintenance items and subsequent repairs include the following: CAU 407: A large animal burrow was observed in the southeast corner of the cover during the inspection. Two additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018. CAU 424: CAS 03-08-002-A304 (Landfill Cell A3-4): A new monument was installed and the subsidence area was repaired on January 9, 2018. CAU 424: CAS 03-08-002-A308 (Landfill Cell A3-8): Lava rock, used to mark the two eastern monument locations, was noted as missing during the inspection. The lava rock was replaced on January 9, 2018. CAU 453: Five large animal burrows, located near the east–central portion of cover, was noted during the inspection. Eight additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018.« less

  19. Trial occlusion to assess the risk of persistent pulmonary arterial hypertension after closure of a large patent ductus arteriosus in adolescents and adults with elevated pulmonary artery pressure.

    PubMed

    Zhang, Duan-Zhen; Zhu, Xian-Yang; Lv, Bei; Cui, Chun-Sheng; Han, Xiu-Min; Sheng, Xiao-Tang; Wang, Qi-Guang; Zhang, Po

    2014-08-01

    No method is available to predict whether patients with patent ductus arteriosus (PDA) and severe pulmonary arterial hypertension (PAH) will show persistent postprocedural PAH (PP-PAH) after PDA closure. This study evaluated the usefulness of trial occlusion for predicting PP-PAH after transcatheter PDA closure in patients with severe PAH. Trial occlusion was performed in 137 patients (age ≥12 years) with PDA and severe PAH. All patients undergoing trial occlusion had a mean pulmonary artery pressure ≥45 mm Hg, pulmonary:systemic flow (Qp/Qs) ratio >1.5, and pulmonary:systemic resistance (Rp/Rs) ratio <0.7. A total of 135 patients (98%) showing stable hemodynamics during occlusion trial underwent successful device closure. Linear correlation analysis revealed weak or moderate relationships between the baseline and post-trial pulmonary artery pressures and pulmonary:systemic pressure (Pp/Ps) ratios. Patients were followed up for 1 to 10 years (median: 5 years). PP-PAH (systolic pulmonary artery pressure >50 mm Hg by Doppler echocardiography) was detected in 17 patients (13%), who displayed no significant differences in sex and age compared with patients without PP-PAH. According to discriminant analysis, the strongest discriminators between patients with and without PP-PAH were the baseline left ventricular end-diastolic volume and the baseline and post-trial systolic Pp/Ps ratios. In particular, a post-trial systolic Pp/Ps ratio >0.5 correctly classified 100% of the PP-PAH and non-PAH patients. Trial occlusion is a feasible method to predict PP-PAH in patients with PDA and severe PAH. A post-trial systolic Pp/Ps ratio >0.5 indicates a high risk of PP-PAH occurrence after device closure. © 2014 American Heart Association, Inc.

  20. Failure of post-natal ductus arteriosus closure in prostaglandin transporter-deficient mice

    PubMed Central

    Chang, Hee-Yoon; Locker, Joseph; Lu, Run; Schuster, Victor L.

    2010-01-01

    Background Prostaglandin E2 (PGE2) plays a major role both in maintaining patency of the fetal ductus arteriosus (DA) and in closure of the DA after birth. The rate- limiting step in PGE2 signal termination is PGE2 uptake by the transporter PGT. Methods and results To determine the role of PGT in DA closure, we used a gene-targeting strategy to produce mice in which PGT exon 1 was flanked by loxP sites. Successful targeting was obtained since neither mice hypomorphic at the PGT allele (PGT Neo/Neo) nor global PGT knockout mice (PGT −/−) exhibited PGT protein expression; moreover, embryonic fibroblasts isolated from targeted mice failed to exhibit carrier-mediated PGE2 uptake. Although born in a normal Mendelian ratio, no PGT −/− mice survived past post-natal day 1, and no PGT Neo/Neo mice survived past post-natal day 2. Necropsy revealed patent DA with normal intimal thickening but with dilated cardiac chambers. Both PGT Neo/Neo and PGT −/− mice could be rescued through the post-natal period by giving the mother indomethacin before birth. Rescued mice grew normally and had no abnormalities by gross and microscopic post-mortem analysis. In accord with PGT’s known role in metabolizing PGE2, rescued adult PGT −/− mice had lower plasma PGE2 metabolite levels, and higher urinary PGE2 excretion rates, than wild type mice. Conclusions PGT plays a critical role in closure of the DA after birth by ensuring a reduction in local and/or circulating PGE2 concentrations. PMID:20083684

  1. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada for fiscal year 2013 (October 2012 - September 2013)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2014-01-31

    This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and, CAU 112, Area 23 Hazardous Waste Trenches.

  2. Contact behaviour of children and parental employment behaviour during school closures against the pandemic influenza A (H1N1-2009) in Japan.

    PubMed

    Mizumoto, Kenji; Yamamoto, Taro; Nishiura, Hiroshi

    2013-06-01

    To identify epidemiological determinants of the contact behaviour of children and their impact on parental employment, during school closures that took place over the course of the 2009 pandemic influenza (H1N1-2009) in Japan. A retrospective survey was conducted in Japanese households between October 2009 and May 2010 by administration of a standardized questionnaire. Demographic and behavioural variables were explored, in association with the frequency with which children left the home and the risk of parents being absent from work during school closures. Data from 882 eligible households were analysed. A total of 181/882 (20.5%) of households reported that children left the home for nonessential reasons during school closures. No impact on parental working hours was reported by 742/882 (84.1%) of households. Univariate analyses showed that the frequency with which children left the home was dependent on age, extent of school closure and requirement for special childcare arrangements. A greater understanding of age-dependent behaviours, during school closures as a consequence of a pandemic, is required. Consideration of a public policy to permit a paid leave of absence from work for parents during school closures may be beneficial; the cost-effectiveness of such a measure should be assessed in future.

  3. Health-Related Quality-of-Life after Laparoscopic Gastric Bypass Surgery with or Without Closure of the Mesenteric Defects: a Post-hoc Analysis of Data from a Randomized Clinical Trial.

    PubMed

    Stenberg, Erik; Szabo, Eva; Ottosson, Johan; Thorell, Anders; Näslund, Ingmar

    2018-01-01

    Mesenteric defect closure in laparoscopic gastric bypass surgery has been reported to reduce the risk for small bowel obstruction. Little is known, however, about the effect of mesenteric defect closure on patient-reported outcome. The aim of the present study was to see if mesenteric defect closure affects health-related quality-of-life (HRQoL) after laparoscopic gastric bypass. Patients operated at 12 centers for bariatric surgery participated in this randomized two-arm parallel study. During the operation, patients were randomized to closure of the mesenteric defects or non-closure. This study was a post-hoc analysis comparing HRQoL of the two groups before surgery, at 1 and 2 years after the operation. HRQoL was estimated using the short form 36 (SF-36-RAND) and the obesity problems (OP) scale. Between May 1, 2010, and November 14, 2011, 2507 patients were included in the study and randomly assigned to mesenteric defect closure (n = 1259) or non-closure (n = 1248). In total, 1619 patients (64.6%) reported on their HRQoL at the 2-year follow-up. Mesenteric defect closure was associated with slightly higher rating of social functioning (87 ± 22.1 vs. 85 ± 24.2, p = 0.047) and role emotional (85 ± 31.5 vs. 82 ± 35.0, p = 0.027). No difference was seen on the OP scale (open defects 22 ± 24.8 vs. closed defects 20 ± 23.8, p = 0.125). When comparing mesenteric defect closure with non-closure, there is no clinically relevant difference in HRQoL after laparoscopic gastric bypass surgery.

  4. Off-pump repair of a post-infarct ventricular septal defect: the 'Hamburger procedure'

    PubMed Central

    Barker, Thomas A; Ng, Alexander; Morgan, Ian S

    2006-01-01

    We report a novel off-pump technique for the surgical closure of post-infarct ventricular septal defects (VSDs). The case report describes the peri-operative management of a 76 year old lady who underwent the 'Hamburger procedure' for closure of her apical VSD. Refractory cardiogenic shock meant that traditional patch repairs requiring cardiopulmonary bypass would be poorly tolerated. We show that echocardiography guided off-pump posterior-anterior septal plication is a safe, effective method for closing post-infarct VSDs in unstable patients. More experience is required to ascertain whether this technique will become an accepted alternative to patch repairs. PMID:16722552

  5. Load and resistance factor rating (LRFR) in New York State : volume II.

    DOT National Transportation Integrated Search

    2011-09-01

    This report develops a Load and Resistance Factor Rating (NYS-LRFR) methodology : for New York bridges. The methodology is applicable for the rating of existing : bridges, the posting of under-strength bridges, and checking Permit trucks. The : propo...

  6. Load and resistance factor rating (LRFR) in NYS : volume II final report.

    DOT National Transportation Integrated Search

    2011-09-01

    This report develops a Load and Resistance Factor Rating (NYS-LRFR) methodology for New York bridges. The methodology is applicable for the rating of existing bridges, the posting of under-strength bridges, and checking Permit trucks. The proposed LR...

  7. 18 CFR 4.303 - Post-filing procedures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., withdrawn or dismissed applications. The Director of the Office of Energy Projects (Director) will, by.... 4.303 Section 4.303 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION...

  8. 18 CFR 4.303 - Post-filing procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., withdrawn or dismissed applications. The Director of the Office of Energy Projects (Director) will, by.... 4.303 Section 4.303 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION...

  9. 18 CFR 4.303 - Post-filing procedures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., withdrawn or dismissed applications. The Director of the Office of Energy Projects (Director) will, by.... 4.303 Section 4.303 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION...

  10. 18 CFR 4.303 - Post-filing procedures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., withdrawn or dismissed applications. The Director of the Office of Energy Projects (Director) will, by.... 4.303 Section 4.303 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION...

  11. Load and resistance factor rating (LRFR) in NYS : volume I final report.

    DOT National Transportation Integrated Search

    2011-09-01

    This report develops a Load and Resistance Factor Rating (NYS-LRFR) methodology for New York bridges. The methodology is applicable for the rating of existing bridges, the posting of under-strength bridges, and checking Permit trucks. The proposed LR...

  12. Load and resistance factor rating (LRFR) in New York State : volume I.

    DOT National Transportation Integrated Search

    2011-09-01

    This report develops a Load and Resistance Factor Rating (NYS-LRFR) methodology : for New York bridges. The methodology is applicable for the rating of existing : bridges, the posting of under-strength bridges, and checking Permit trucks. The : propo...

  13. Post-closure care of engineered municipal solid waste landfills.

    PubMed

    Bagchi, Amalendu; Bhattacharya, Abhik

    2015-03-01

    Post-closure care is divided into perpetual care (PPC) and long-term care (LTC). Guidelines for post-closure care and associated costs are important for engineered municipal solid waste (MSW) landfills. In many states in the USA, landfill owners are required to set aside funds for 30-40 years of LTC. Currently there are no guidelines for PPC, which is also required. We undertook a pilot study, using two landfills (note: average landfill capacity 2.5 million MT MSW waste) in Wisconsin, to establish an approach for estimating the LTC period using field data and PPC funding need. Statistical analysis of time versus concentration data of selected leachate parameters showed that the concentration of most parameters is expected to be at or below the preventive action limit of groundwater and leachate volume will be very low, within 40 years of the LTC period. The gas extraction system may need to be continued for more than 100 years. Due to lack of data no conclusion could be made regarding adequacy of the LTC period for the groundwater monitoring system. The final cover must be maintained for perpetuity. The pilot study shows that although technology is available, the financial liability of maintaining a 'Dry Tomb' design for landfills is significantly higher than commonly perceived. The paper will help landfill professionals to estimate realistic post-closure funding and to develop field-based policies for LTC and PPC of engineered MSW landfills. © The Author(s) 2015.

  14. 49 CFR 179.100-13 - Venting, loading and unloading valves, measuring and sampling devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... permit testing thermometer well for leaks without complete removal of the closure may be used. (d) An... cast, forged or fabricated metal. Each sump or siphon bowl must be of good welding quality in...

  15. 75 FR 49466 - New England Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... Bank yellowtail flounder rebuilding strategies ABCs for stocks including Gulf of Maine winter flounder and pollock Whaleback area spawning closure Permit bank implementation Accountability measures... action to address the emergency. Special Accommodations This meeting is physically accessible to people...

  16. Spontaneous closure of post-intervention left anterior descending coronary pseudoaneurysm.

    PubMed

    Nunes, Rafael A B; Cade, Jamil R; Silva, Rafael C; Brito Júnior, Fábio S; Freitas, Humberto F G

    2014-06-01

    Coronary pseudoaneurysms are an unusual finding during coronary angiography and there are very little data on their prognosis in the literature. We report the case of a 62-year-old man admitted with an anterior myocardial infarction who developed a pseudoaneurysm in the mid left anterior descending artery some days after a type I coronary perforation during coronary angioplasty. Spontaneous closure of the pseudoaneurysm was observed during hospital follow-up. Spontaneous closure of coronary pseudoaneurysms may be more common in clinical practice than previously thought, but few cases have been reported. As the natural history of post-intervention coronary pseudoaneurysms has been little investigated, reports of their occurrence may help to clarify their evolution. Copyright © 2013 Sociedade Portuguesa de Cardiologia. Published by Elsevier España. All rights reserved.

  17. 10 CFR 60.51 - License amendment for permanent closure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... description of the program for post-permanent closure monitoring of the geologic repository. (2) A detailed... postclosure controlled area and geologic repository operations area by monuments that have been designed... tests, experiments, and any other analyses relating to backfill of excavated areas, shaft sealing, waste...

  18. 10 CFR 60.51 - License amendment for permanent closure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... description of the program for post-permanent closure monitoring of the geologic repository. (2) A detailed... postclosure controlled area and geologic repository operations area by monuments that have been designed... tests, experiments, and any other analyses relating to backfill of excavated areas, shaft sealing, waste...

  19. 10 CFR 60.51 - License amendment for permanent closure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... description of the program for post-permanent closure monitoring of the geologic repository. (2) A detailed... postclosure controlled area and geologic repository operations area by monuments that have been designed... tests, experiments, and any other analyses relating to backfill of excavated areas, shaft sealing, waste...

  20. 10 CFR 60.51 - License amendment for permanent closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... description of the program for post-permanent closure monitoring of the geologic repository. (2) A detailed... postclosure controlled area and geologic repository operations area by monuments that have been designed... tests, experiments, and any other analyses relating to backfill of excavated areas, shaft sealing, waste...

  1. 10 CFR 60.51 - License amendment for permanent closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... description of the program for post-permanent closure monitoring of the geologic repository. (2) A detailed... postclosure controlled area and geologic repository operations area by monuments that have been designed... tests, experiments, and any other analyses relating to backfill of excavated areas, shaft sealing, waste...

  2. 40 CFR 265.280 - Closure and post-closure.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and subsurface hydrology of the site, and soil characteristics, including cation exchange capacity, total organic..., concentration, and depth of migration of hazardous waste constituents in the soil as compared to their...

  3. 40 CFR 265.280 - Closure and post-closure.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and subsurface hydrology of the site, and soil characteristics, including cation exchange capacity, total organic..., concentration, and depth of migration of hazardous waste constituents in the soil as compared to their...

  4. 40 CFR 265.280 - Closure and post-closure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and subsurface hydrology of the site, and soil characteristics, including cation exchange capacity, total organic..., concentration, and depth of migration of hazardous waste constituents in the soil as compared to their...

  5. 40 CFR 265.280 - Closure and post-closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and subsurface hydrology of the site, and soil characteristics, including cation exchange capacity, total organic..., concentration, and depth of migration of hazardous waste constituents in the soil as compared to their...

  6. 40 CFR 265.280 - Closure and post-closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., including amount, frequency, and pH of precipitation; (5) Geological and soil profiles and surface and subsurface hydrology of the site, and soil characteristics, including cation exchange capacity, total organic..., concentration, and depth of migration of hazardous waste constituents in the soil as compared to their...

  7. Endoscopic repair of an injured internal carotid artery utilizing femoral endovascular closure devices.

    PubMed

    Van Rompaey, Jason; Bowers, Greg; Radhakrishnan, Jay; Panizza, Benedict; Solares, C Arturo

    2014-06-01

    Injury to the internal carotid artery is a feared complication of endoscopic endonasal surgery of the skull base. Such an event, although rare, is associated with high morbidity and mortality. Even if bleeding is controlled, permanent neurological defects frequently persist. Many techniques have been developed to manage internal carotid artery rupture with varying degrees of success. The purpose of this study was to explore endoscopic management of arterial damage with endovascular closure devices used for a femoral arteriotomy. The ability to remotely suture a damaged artery permits the possible adaptation of this technology in managing endoscopic arterial complications. Technical note. After the creation of an endoscopic endonasal corridor in a cadaveric specimen, an arteriotomy was created at the cavernous portion of the internal carotid artery. The Angio-Seal, StarClose, and MynxGrip vascular closure devices were utilized under endoscopic guidance to repair the arteriotomy. Angiography was then done on a cadaver sutured with the StarClose. Both the Angio-Seal and StarClose were deployed quickly and appeared to provide sufficient closure of the arteriotomy. The Angio-Seal required the use of a guidewire and was longer to deploy when compared with the StarClose. The StarClose deployment was quick and facile. The MynxGrip also deployed without difficulty. The Angio-Seal and StarClose systems were both successfully deployed utilizing an endoscopic endonasal approach. The MynxGrip was the easiest to deploy and has the greatest potential to be of benefit in this application. Further studies with hemodynamic models are required to properly assess the appropriateness in this setting. NA. © 2014 The American Laryngological, Rhinological and Otological Society, Inc.

  8. Transabdominal Preperitoneal Herniorrhaphy using Laser-Assisted Tissue Soldering in a Porcine Model

    PubMed Central

    Soltz, Barbara A.; Stadler, Istvan; Soltz, Robert

    2009-01-01

    Background and Objectives: Collagen solder is capable of fixation of surgical meshes during laparoscopic herniorrhaphy without compromising tissue integration, increasing adhesions or inflammation. This pilot study describes development of instrumentation and techniques for transabdominal preperitoneal (TAPP) herniorrhaphy using laser-assisted soldering technology. Methods: Anesthetized 20-kg to 25-kg female Yorkshire pigs underwent laparoscopy performed using a 3-trocar technique. Peritoneal incisions were made and pockets created in the preperitoneal space for mesh placement. Parietex TEC mesh segments embedded in 60% collagen-solder were soldered to the muscle surface by using a prototype laser (1.45µ, 4.5W CW, 5mm spot, and 55°C set temperature) and custom laparoscopic handpiece. Parietex TEC mesh segments (Control) were affixed to the muscle with fibrin sealant (Tisseel). Peritoneal closure was with staples (Control) or by soldering collagen embedded Vicryl mesh segments over the peritoneal incision (Mesh/TAPP). Segments were inserted using a specially designed introducer. Animals were recovered and underwent second-look laparoscopy at 6 weeks postimplantation. Mesh sites were harvested after animals were euthanized. Results: The mesh-solder constructs were easily inserted and affixed in the TAPP approach. Tisseel tended to drip during application, particularly in vertical and ventral locations. Postoperative healing was similar to Control segments in all cases. Mesh/TAPP closures healed without scarring or adhesion formation. Discussion and Conclusion: Collagen-based tissue soldering permits normal wound healing and may mitigate or reduce use of staples for laparoscopic mesh fixation and peritoneal closure. Laser-assisted mesh fixation and peritoneal closure is a promising alternative for laparoscopic herniorrhaphy. Further development of this strategy is warranted. PMID:19660214

  9. Relaxing the closure assumption in single-season occupancy models: staggered arrival and departure times

    USGS Publications Warehouse

    Kendall, William L.; Hines, James E.; Nichols, James D.; Grant, Evan H. Campbell

    2013-01-01

    Occupancy statistical models that account for imperfect detection have proved very useful in several areas of ecology, including species distribution and spatial dynamics, disease ecology, and ecological responses to climate change. These models are based on the collection of multiple samples at each of a number of sites within a given season, during which it is assumed the species is either absent or present and available for detection while each sample is taken. However, for some species, individuals are only present or available for detection seasonally. We present a statistical model that relaxes the closure assumption within a season by permitting staggered entry and exit times for the species of interest at each site. Based on simulation, our open model eliminates bias in occupancy estimators and in some cases increases precision. The power to detect the violation of closure is high if detection probability is reasonably high. In addition to providing more robust estimation of occupancy, this model permits comparison of phenology across sites, species, or years, by modeling variation in arrival or departure probabilities. In a comparison of four species of amphibians in Maryland we found that two toad species arrived at breeding sites later in the season than a salamander and frog species, and departed from sites earlier.

  10. Intraoperative Hemodynamic and Echocardiographic Measurements Associated With Severe Right Ventricular Failure After Left Ventricular Assist Device Implantation.

    PubMed

    Gudejko, Michael D; Gebhardt, Brian R; Zahedi, Farhad; Jain, Ankit; Breeze, Janis L; Lawrence, Matthew R; Shernan, Stanton K; Kapur, Navin K; Kiernan, Michael S; Couper, Greg; Cobey, Frederick C

    2018-06-05

    Severe right ventricular failure (RVF) after left ventricular assist device (LVAD) implantation increases morbidity and mortality. We investigated the association between intraoperative right heart hemodynamic data, echocardiographic parameters, and severe versus nonsevere RVF. A review of LVAD patients between March 2013 and March 2016 was performed. Severe RVF was defined by the need for a right ventricular mechanical support device, inotropic, and/or inhaled pulmonary vasodilator requirements for >14 days. From a chart review, the right ventricular failure risk score was calculated and right heart hemodynamic data were collected. Pulmonary artery pulsatility index (PAPi) [(pulmonary artery systolic pressure - pulmonary artery diastolic pressure)/central venous pressure (CVP)] was calculated for 2 periods: (1) 30 minutes before cardiopulmonary bypass (CPB) and (2) after chest closure. Echocardiographic data were recorded pre-CPB and post-CPB by a blinded reviewer. Univariate logistic regression models were used to examine the performance of hemodynamic and echocardiographic metrics. A total of 110 LVAD patients were identified. Twenty-five did not meet criteria for RVF. Of the remaining 85 patients, 28 (33%) met criteria for severe RVF. Hemodynamic factors associated with severe RVF included: higher CVP values after chest closure (18 ± 9 vs 13 ± 5 mm Hg; P = .0008) in addition to lower PAPi pre-CPB (1.2 ± 0.6 vs 1.7 ± 1.0; P = .04) and after chest closure (0.9 ± 0.5 vs 1.5 ± 0.8; P = .0008). Post-CPB echocardiographic findings associated with severe RVF included: larger right atrial diameter major axis (5.4 ± 0.9 vs 4.9 ± 1.0 cm; P = .03), larger right ventricle end-systolic area (22.6 ± 8.4 vs 18.5 ± 7.9 cm; P = .03), lower fractional area of change (20.2 ± 10.8 vs 25.9 ± 12.6; P = .04), and lower tricuspid annular plane systolic excursion (0.9 ± 0.2 vs 1.1 ± 0.3 cm; P = .008). Right ventricular failure risk score was not a significant predictor of severe RVF. Post-chest closure CVP and post-chest closure PAPi discriminated severe from nonsevere RVF better than other variables measured, each with an area under the curve of 0.75 (95% CI, 0.64-0.86). Post-chest closure values of CVP and PAPi were significantly associated with severe RVF. Echocardiographic assessment of RV function post-CPB was weakly associated with severe RVF.

  11. 40 CFR 265.116 - Survey plat.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Survey plat. 265.116 Section 265.116... and Post-Closure § 265.116 Survey plat. No later than the submission of the certification of closure..., or the authority with jurisdiction over local land use, and to the Regional Administrator, a survey...

  12. 40 CFR 265.116 - Survey plat.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Survey plat. 265.116 Section 265.116... and Post-Closure § 265.116 Survey plat. No later than the submission of the certification of closure..., or the authority with jurisdiction over local land use, and to the Regional Administrator, a survey...

  13. 40 CFR 265.116 - Survey plat.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Survey plat. 265.116 Section 265.116... and Post-Closure § 265.116 Survey plat. No later than the submission of the certification of closure..., or the authority with jurisdiction over local land use, and to the Regional Administrator, a survey...

  14. 40 CFR 265.116 - Survey plat.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Survey plat. 265.116 Section 265.116... and Post-Closure § 265.116 Survey plat. No later than the submission of the certification of closure..., or the authority with jurisdiction over local land use, and to the Regional Administrator, a survey...

  15. 40 CFR 265.116 - Survey plat.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Survey plat. 265.116 Section 265.116... and Post-Closure § 265.116 Survey plat. No later than the submission of the certification of closure..., or the authority with jurisdiction over local land use, and to the Regional Administrator, a survey...

  16. 50 CFR 36.42 - Public participation and closure procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 9 2012-10-01 2012-10-01 false Public participation and closure procedures. 36.42 Section 36.42 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF... community post offices within the vicinity affected, made available for broadcast on local radio stations in...

  17. 50 CFR 36.42 - Public participation and closure procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 9 2013-10-01 2013-10-01 false Public participation and closure procedures. 36.42 Section 36.42 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF... community post offices within the vicinity affected, made available for broadcast on local radio stations in...

  18. 40 CFR 264.119 - Post-closure notices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 264.119 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... closure of each hazardous waste disposal unit, the owner or operator must submit to the local zoning... required by §§ 264.116 and 264.119(a) have been filed with the local zoning authority or the authority with...

  19. 40 CFR 264.119 - Post-closure notices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 264.119 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... closure of each hazardous waste disposal unit, the owner or operator must submit to the local zoning... required by §§ 264.116 and 264.119(a) have been filed with the local zoning authority or the authority with...

  20. 10 CFR 63.51 - License amendment for permanent closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to compliance with § 63.113. (2) A description of the program for post-permanent closure monitoring... that have been designed, fabricated, and emplaced to be as permanent as is practicable; (ii) Placement..., pertinent to compliance with § 63.113. (5) The results of tests, experiments, and any other analyses...

  1. 10 CFR 63.51 - License amendment for permanent closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... to compliance with § 63.113. (2) A description of the program for post-permanent closure monitoring... that have been designed, fabricated, and emplaced to be as permanent as is practicable; (ii) Placement..., pertinent to compliance with § 63.113. (5) The results of tests, experiments, and any other analyses...

  2. 40 CFR 258.75 - Discounting.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL... State may allow discounting of closure cost estimates in § 258.71(a), post-closure cost estimates in § 258.72(a), and/or corrective action costs in § 258.73(a) up to the rate of return for essentially risk...

  3. 40 CFR 258.62-258.69 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false [Reserved] 258.62-258.69 Section 258.62-258.69 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Closure and Post-Closure Care §§ 258.62-258.69 [Reserved] ...

  4. 40 CFR 258.63-258.69 - [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false [Reserved] 258.63-258.69 Section 258.63-258.69 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Closure and Post-Closure Care §§ 258.63-258.69 [Reserved] ...

  5. 10 CFR 61.30 - Transfer of license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Transfer of license. 61.30 Section 61.30 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.30 Transfer of license. (a) Following closure and the period of post-closure observation and...

  6. 10 CFR 61.30 - Transfer of license.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Transfer of license. 61.30 Section 61.30 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.30 Transfer of license. (a) Following closure and the period of post-closure observation and...

  7. 10 CFR 61.30 - Transfer of license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Transfer of license. 61.30 Section 61.30 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.30 Transfer of license. (a) Following closure and the period of post-closure observation and...

  8. 10 CFR 61.30 - Transfer of license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Transfer of license. 61.30 Section 61.30 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.30 Transfer of license. (a) Following closure and the period of post-closure observation and...

  9. 10 CFR 61.30 - Transfer of license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Transfer of license. 61.30 Section 61.30 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.30 Transfer of license. (a) Following closure and the period of post-closure observation and...

  10. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2013-01-28

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2012 and includes inspection and repair activities completed at the following CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 487: Thunderwell Site (TTR)

  11. MATERIALS SUPPORTING THE NEW RECREATIONAL WATER QUALITY CRITERIA FOR PATHOGENS

    EPA Science Inventory

    EPA is developing new, rapid methods for monitoring water quality at beaches to determine adequacy of water quality for swimming. The methods being developed rely upon quantitive polymerase chain reaction technology. They will permit real time decisions regarding beach closures...

  12. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  13. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  14. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  15. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  16. 10 CFR 61.28 - Contents of application for closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...

  17. Association of aortic stiffness to brain natriuretic peptide in children before and after device closure of patent ductus arteriosus

    PubMed Central

    Mahfouz, Ragab A.; Alzaiat, Ahmad; Gad, Marwa

    2014-01-01

    Objectives We evaluated the influence of device closure for patent ductus arteriosus (PDA) on the aortic stiffness index (ASI) and brain natriuretic peptide (BNP) and their association with cardiac function. Patients and methods ASI and echocardiography assessment before and after treatment (16 ± 9 months) in 48 children with PDA (mean age 10 ± 4.5) and 52 control children (mean age 9.7 ± 4.6). BNP level was measured pre-closure for all children, and was measured six months after closure only for children with PDA. Results ASI was higher in PDA patients than in controls (P < 0.001). ASI correlated with age (P < 0.05), LVEF% (P < 0.01), E/E′ (<0.03), pulmonary artery pressure (P < 0.001), and BNP (P < 0.001). ASI and BNP significantly decreased after closure (P < 0.001). ASI and BNP were independent predictors for post-closure systolic dysfunction (P < 0.001and <0.005, respectively). Receiver operating curve (ROC) analysis showed that ASI ⩾ 13.5, BNP level ⩾75 pg/ml and basal mean pulmonary artery pressure (PAP) ⩾ 23 were powerful predictors for post-closure systolic function. Conclusion ASI is significantly associated with BNP and basal PAP in children with PDA. After device closure, aortic distensibility improved significantly and was associated with significant improvement in both systolic and diastolic functions. ASI can be used for monitoring the course of patients with PDA, and may give opportunities for early intervention. PMID:25544819

  18. Modified nondestructive colorimetric method to evaluate the variability of oxygen diffusion rate through wine bottle closures.

    PubMed

    Brotto, Laura; Battistutta, Franco; Tat, Lara; Comuzzo, Piergiorgio; Zironi, Roberto

    2010-03-24

    Some modifications to a previous nondestructive colorimetric method that permits evaluation of the oxygen diffusion rate through wine closures were proposed. The method is based on the reaction of indigo carmine solution with oxygen and the tristimulus measurement of the consequent color change. Simplified preparation and measurement procedures were set up, allowing the analysis of a large number of samples simultaneously. The method was applied to the evaluation of the variability within the lot of 20 different types of stoppers (synthetic, produced by molding, and natural cork). The closures were tested at a storage temperature of 26 degrees C. With regard to oxygen permeability, the natural cork stopper showed a low homogeneity within the lot, especially during the first month after bottling, whereas the synthetic closure showed a greater steadiness in the performance. The limits of the colorimetric method were also analyzed, and three possible causes of degradation of the indigo carmine solution were identified: oxygen, light, and heat.

  19. Advances in the Surgical Treatment of Gastroschisis.

    PubMed

    Safavi, Arash; Skarsgard, Erik D

    2015-05-01

    Gastroschisis (GS) is a structural defect of the anterior abdominal wall, usually diagnosed antenatally, that occurs with a frequency of approximately 4 per 10,000 pregnancies. Babies born with GS require neonatal intensive care and surgical management of the abdominal wall defect soon after birth. Although contemporary survival rates for GS are over 90%, these babies are at risk for significant morbidity, and require 4 to 6 weeks of costly, resource-intensive care in specialized neonatal units. Much consideration has been given to how best to treat the abdominal wall defect of GS. The traditional approach, necessitated by a need to establish enteral feeding as quickly as possible, consists of early postnatal visceral reduction and sutured abdominal closure. Advances in neonatal nutritional support have enabled the development of surgical approaches, which permit gradual visceral reduction and delayed abdominal closure. In cases where early visceral reduction cannot be achieved, delayed closure enabled by the initial placement of a prosthetic silo has been a live-saving alternative. The development of preformed silos has simplified their use and led to an interest in treating all cases with a delayed closure philosophy. Most recently, a sutureless technique of abdominal closure has been reported, which has the benefit of avoiding general anesthesia and offers other outcome improvements over sutured closure of the defect. The debate over primary closure versus silo placement and delayed closure continues to receive much attention. The goal of this article is to review historical aspects of gastroschisis closure, and then focus on current surgical techniques, including the innovative sutureless closure, with an analysis of the comparative clinical effectiveness of these approaches to treatment of the abdominal wall defect in GS.

  20. 78 FR 40195 - Proposed Information Collection; Application for a Permit To Fire More than 20 Boreholes and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... DEPARTMENT OF LABOR Mine Safety and Health Administration Proposed Information Collection..., Explosives, and Shot-Firing Units; Posting Notices of Misfires AGENCY: Mine Safety and Health Administration..., and the impact of collection requirements on respondents can be properly assessed. Currently, the Mine...

  1. 36 CFR 228.115 - Additional notice of decisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management of: (1) Competitive lease sales which the Bureau plans to conduct that include National Forest... leases on National Forest System lands; and (3) Applications for permits to drill which the Bureau has received for leaseholds located on National Forest System lands. (b) The notice shall be posted at the...

  2. Hurricane Recovery and Ecological Resilience: Measuring the Impacts of Wetland Alteration Post Hurricane Ike on the Upper TX Coast

    NASA Astrophysics Data System (ADS)

    Reja, Md Y.; Brody, Samuel D.; Highfield, Wesley E.; Newman, Galen D.

    2017-12-01

    Recovery after hurricane events encourages new development activities and allows reconstruction through the conversion of naturally occurring wetlands to other land uses. This research investigates the degree to which hurricane recovery activities in coastal communities are undermining the ability of these places to attenuate the impacts of future storm events. Specifically, it explores how and to what extent wetlands are being affected by the CWA Section 404 permitting program in the context of post-Hurricane Ike 2008 recovery. Wetland alteration patterns are examined by selecting a control group (Aransas and Brazoria counties with no hurricane impact) vs. study group (Chambers and Galveston counties with hurricane impact) research design with a pretest-posttest measurement analyzing the variables such as permit types, pre-post Ike permits, land cover classes, and within-outside the 100-year floodplain. Results show that permitting activities in study group have increased within the 100-year floodplain and palustrine wetlands continue to be lost compare to the control group. Simultaneously, post-Ike individual and nationwide permits increased in the Hurricane Ike impacted area. A binomial logistic regression model indicated that permits within the study group, undeveloped land cover class, and individual and nationwide permit type have a substantial effect on post-Ike permits, suggesting that post-Ike permits have significant impact on wetland losses. These findings indicate that recovery after the hurricane is compromising ecological resiliency in coastal communities. The study outcome may be applied to policy decisions in managing wetlands during a long-term recovery process to maintain natural function for future flood mitigation.

  3. Hurricane Recovery and Ecological Resilience: Measuring the Impacts of Wetland Alteration Post Hurricane Ike on the Upper TX Coast.

    PubMed

    Reja, Md Y; Brody, Samuel D; Highfield, Wesley E; Newman, Galen D

    2017-12-01

    Recovery after hurricane events encourages new development activities and allows reconstruction through the conversion of naturally occurring wetlands to other land uses. This research investigates the degree to which hurricane recovery activities in coastal communities are undermining the ability of these places to attenuate the impacts of future storm events. Specifically, it explores how and to what extent wetlands are being affected by the CWA Section 404 permitting program in the context of post-Hurricane Ike 2008 recovery. Wetland alteration patterns are examined by selecting a control group (Aransas and Brazoria counties with no hurricane impact) vs. study group (Chambers and Galveston counties with hurricane impact) research design with a pretest-posttest measurement analyzing the variables such as permit types, pre-post Ike permits, land cover classes, and within-outside the 100-year floodplain. Results show that permitting activities in study group have increased within the 100-year floodplain and palustrine wetlands continue to be lost compare to the control group. Simultaneously, post-Ike individual and nationwide permits increased in the Hurricane Ike impacted area. A binomial logistic regression model indicated that permits within the study group, undeveloped land cover class, and individual and nationwide permit type have a substantial effect on post-Ike permits, suggesting that post-Ike permits have significant impact on wetland losses. These findings indicate that recovery after the hurricane is compromising ecological resiliency in coastal communities. The study outcome may be applied to policy decisions in managing wetlands during a long-term recovery process to maintain natural function for future flood mitigation.

  4. The development and preliminary application of an invariant coupled diffusion and chemistry model

    NASA Technical Reports Server (NTRS)

    Hilst, G. R.; Donaldson, C. DUP.; Teske, M.; Contiliano, R.; Freiberg, J.

    1973-01-01

    In many real-world pollution chemical reaction problems, the rate of reaction problems, the rate of reaction may be greatly affected by unmixedness. An approximate closure scheme for a chemical kinetic submodel which conforms to the principles of invariant modeling and which accounts for the effects of inhomogeneous mixing over a wide range of conditions has been developed. This submodel has been coupled successfully with invariant turbulence and diffusion models, permitting calculation of two-dimensional diffusion of two reacting (isothermally) chemical species. The initial calculations indicate the ozone reactions in the wake of stratospheric aircraft will be substantially affected by the rate of diffusion of ozone into the wake, and in the early wake, by unmixedness.

  5. 49 CFR 178.955 - General requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... void space(s) and to prevent significant movement of the inner packagings. (h) Proof of compliance. In... subchapter. Variations are permitted in inner packagings of a tested Large Packaging, without further testing... determine that the inner packaging, including closure, maintains an equivalent level of performance is...

  6. 49 CFR 178.955 - General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... void space(s) and to prevent significant movement of the inner packagings. (h) Proof of compliance. In... subchapter. Variations are permitted in inner packagings of a tested Large Packaging, without further testing... determine that the inner packaging, including closure, maintains an equivalent level of performance is...

  7. 49 CFR 178.955 - General requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... void space(s) and to prevent significant movement of the inner packagings. (h) Proof of compliance. In... subchapter. Variations are permitted in inner packagings of a tested Large Packaging, without further testing... determine that the inner packaging, including closure, maintains an equivalent level of performance is...

  8. 49 CFR 178.955 - General requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... void space(s) and to prevent significant movement of the inner packagings. (h) Proof of compliance. In... subchapter. Variations are permitted in inner packagings of a tested Large Packaging, without further testing... determine that the inner packaging, including closure, maintains an equivalent level of performance is...

  9. 50 CFR 36.42 - Public participation and closure procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES Permits... protection, protection of cultural or scientific values, subsistence uses, endangered or threatened species... managed in a manner compatible with the purposes for which the Alaska National Wildlife Refuge area was...

  10. 50 CFR 36.42 - Public participation and closure procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES Permits... protection, protection of cultural or scientific values, subsistence uses, endangered or threatened species... managed in a manner compatible with the purposes for which the Alaska National Wildlife Refuge area was...

  11. Sustainable gold mining management waste policy in Romania

    NASA Astrophysics Data System (ADS)

    Tudor, Elena; Filipciuc, Constantina

    2016-04-01

    Sustainable mining practices and consistent implementation of the mining for the closure planning approach, within an improved legislative framework, create conditions for the development of creative, profitable, environmentally-sound and socially-responsible management and reuse of mine lands. According to the World Commission on Environment and Development definition, sustainable development is the type of development that meets the needs of the present without compromising the ability of future generations to meet their own needs. Romania has the largest gold reserves in Europe (760 million tons of gold-silver ores, of which 40 million tons in 68 gold deposits in the Apuseni Mountains. New mining projects draw particular attention regarding the environmental risks they cause. Rehabilitation is an ongoing consideration throughout the mine's lifecycle, both from a technical and a financial standpoint. The costs of land rehabilitation are classified as the mine's operating costs. According to Directive 2004/35/EC on environmental liability, the prevention and remedying of environmental damage should be implemented by applying the "polluter pays" principle, in line with the principle of sustainable development. Directive on the management of waste from extractive industries and amending Directive obliges operators to provide (and periodically adjust in size) a financial guarantee for waste facility maintenance and post-closure site restoration, including land rehabilitation. According to the Romanian Mining Law, the license holder has the following obligations related to land use and protection: to provide environmental agreements as one of the prerequisites for a building permit; to regularly update the mine closure plan; to set up and maintain the financial guarantee for environmental rehabilitation; and to execute and finalize the environmental rehabilitation of affected land in the mining site, according to the mine closure plan, including the post-closure monitoring program implementation and financing. Apart from the Mining Law, the Government Decision, which transposes EU Directive on the management of waste from extractive industries, as well as Government Emergency Ordinance, which implements the requirements of EU Directive 2004/35/CE on environmental liability, requests financial guarantees for waste facilities maintenance and for environment restoration in the case of pollution, respectively. In practice, there are problems in the calculation of the financial guarantee and the development of financial security instruments and markets as required by Directive, due to the lack of expertise in financial, economic and liability matters. Mining companies are usually not required to set up a special guarantee for the waste facilities, but only to set up and maintain the financial guarantee regulated under the Mining Law. Romania - because of the structure of its mining sector - has serious environmental legacies, a lack of funds for their restoration and the need to strengthen the administrative capacity in this area, as well as the important tasks on harmonization and/or implementation of the EU mining waste legislation. This work is presented within the framework of SUSMIN project. Key words : sustainable development, waste management, policy

  12. Pancreatoenteral anastomosis or direct closure of the pancreatic remnant after a distal pancreatectomy: a single-centre experience

    PubMed Central

    Klein, Fritz; Glanemann, Matthias; Faber, Wladimir; Gül, Safak; Neuhaus, Peter; Bahra, Marcus

    2012-01-01

    Background A major complication of a distal pancreatectomy (DP) is the formation of a post-operative pancreatic fistula (POPF). In spite of the utilization of numerous surgical techniques no consensus on an appropriate technique for closure of the pancreatic remnant after DP has been established yet. The aim of this study was to analyse the impact of pancreatoenteral anastomosis (PE) vs. direct closure (DC) of the pancreatic remnant on POPF. Methods A total of 198 consecutive patients who underwent a distal pancreatectomy between 2002 and 2010 at our institution were retrospectively analysed for post-operative morbidity and mortality. Results One hundred and fifty-one patients (76.3%) received DC whereas PE was performed in 47 patients (23.7%). The incidence of POPF was higher in the DC group (22% vs. 11%), whereas the rate of post-operative haemorrhage was higher in the PE group (11% vs. 7%). However, these differences were not significant. Additionally, there were no significant differences in overall post-operative morbidity and mortality between the groups. Conclusions The performance of PE instead of DC may be considered as a safe alternative in individual patients, but it does not significantly lead to a general improvement in post-operative outcome after DP. An interdisciplinary collaboration in the prevention and treatment of POPF therefore remains essential. PMID:23134180

  13. Performance and completion assessment of an in-situ aerated municipal solid waste landfill - Final scientific documentation of an Austrian case study.

    PubMed

    Hrad, Marlies; Huber-Humer, Marion

    2017-05-01

    By converting anaerobic landfills into a biologically stabilized state through accelerating aerobic organic matter degradation, the effort and duration necessary for post-closure procedures can be shortened. In Austria, the first full-scale application of in-situ landfill aeration by means of low pressure air injection with simultaneous off-gas collection and treatment was implemented on an old MSW-landfill and operated between 2007 and 2013. Besides complementary laboratory investigations, which included waste sampling from the landfill site prior to aeration start, a comprehensive field monitoring program was conducted to assess the influence of the aeration measure on the emission behavior of the landfilled waste during the aeration period as well as after aeration completion. Although the initial waste material was described as rather stable, the lab-scale aeration tests indicated a significant improvement of the leachate quality and even the biological solid waste stability. However, the aeration success was less pronounced for the application at the landfill site, mainly due to technical limitations in the full-scale operation. In this paper main performance data of the field investigation are compared to four other scientifically documented case studies along with stability indicators for solid waste and leachate characteristics in order to evaluate the success of aeration as well as the progress of a landfill towards completion and end of post-closure care. A number of quantitative benchmarks and relevant context information for the performance assessment of the five hitherto conducted international aeration projects are proposed aiming to support the systematization and harmonization of available results from diverse field studies and full-scale applications in future. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. A snapshot of summer 2001 work zone activity : based on information reported on state road closure and construction websites

    DOT National Transportation Integrated Search

    2003-02-01

    In a study sponsored by the Federal Highway Administration (FHWA), researchers conducted a survey of 789 work zones posted on 13 state road closure and construction websites during a two-week snapshot of the peak summer roadwork season in 2001. The g...

  15. No-migration variance petition. Appendices C--J: Volume 5, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-03-01

    Volume V contains the appendices for: closure and post-closure plans; RCRA ground water monitoring waver; Waste Isolation Division Quality Program Manual; water quality sampling plan; WIPP Environmental Procedures Manual; sample handling and laboratory procedures; data analysis; and Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant.

  16. Pilonidal sinus disease surgery in children: the first study to compare crystallized phenol application to primary excision and closure.

    PubMed

    Ates, Ufuk; Ergun, Ergun; Gollu, Gulnur; Sozduyar, Sumeyye; Kologlu, Meltem; Cakmak, Murat; Dindar, Huseyin; Yagmurlu, Aydin

    2018-03-01

    Pilonidal sinus (PS) is an infectious and inflammatory disease of sacrococcygeal region. Current methods include; surgical excision with/without suturing the defect, rhomboid excision and flap and chemical substance application. In this study, crystallized phenol application was compared to excision and primary closure. This retrospective study included pediatric patients with PS who were treated with excision and primer closure technique and phenol application. The patients' medical data were analyzed retrospectively. This study included 117 patients with PS. There were 52 girls (44%) and 65 boys (56%). Mean age of children was 15.6 (12-20) years. Excision and primary closure were applied to 77 patients (66%) and phenol was applied to 40 patients (34%). The children in phenol group were discharged on the operation day; mean hospitalization time in the excision and primary closure group was 2.7 (1-14) days. Mean follow up was 44.6 (8-82) months for primary excision and closure group and 8.1 (1-19) months for phenol group. Although many surgical and non-surgical treatment modalities have been described for PS, the optimal one remains unknown. Limited with the retrospective nature of the data, crystallized phenol application seems a feasible minimal invasive alternative to primary closure of PS with lower recurrence and complication rates in children. Level III. Copyright © 2017 Elsevier Inc. All rights reserved.

  17. Subharmonic response of a single-degree-of-freedom nonlinear vibro-impact system to a narrow-band random excitation.

    PubMed

    Haiwu, Rong; Wang, Xiangdong; Xu, Wei; Fang, Tong

    2009-08-01

    The subharmonic response of single-degree-of-freedom nonlinear vibro-impact oscillator with a one-sided barrier to narrow-band random excitation is investigated. The narrow-band random excitation used here is a filtered Gaussian white noise. The analysis is based on a special Zhuravlev transformation, which reduces the system to one without impacts, or velocity jumps, thereby permitting the applications of asymptotic averaging over the "fast" variables. The averaged stochastic equations are solved exactly by the method of moments for the mean-square response amplitude for the case of linear system with zero offset. A perturbation-based moment closure scheme is proposed and the formula of the mean-square amplitude is obtained approximately for the case of linear system with nonzero offset. The perturbation-based moment closure scheme is used once again to obtain the algebra equation of the mean-square amplitude of the response for the case of nonlinear system. The effects of damping, detuning, nonlinear intensity, bandwidth, and magnitudes of random excitations are analyzed. The theoretical analyses are verified by numerical results. Theoretical analyses and numerical simulations show that the peak amplitudes may be strongly reduced at large detunings or large nonlinear intensity.

  18. The etiology and determinants of hospital closure.

    PubMed

    Longo, D R; Sohn, M W; Shortell, S M

    1996-01-01

    This article examines the etiology of hospital closure and the correlates of hospital closure and the extent of similarity in this organizational outcome between pre- and post-Prospective Payment System (PPS) implementation. It also replicates a study from an earlier time period. Findings support the study's main hypotheses: in more stringent and turbulent markets, institutional and strategic variables are more important determinants of hospital closure. Merger acquisitions are found to be similar to both system acquisitions and autonomous hospitals. Standard Metropolitan Statistical Area (SMSA) status and regulation show an effect on hospital closure and merger acquisition. While many similarities exist when compared to the replicated study and findings prior to PPS implementation, it appears that sufficient differences exist to support the hypothesis that the PPS has an impact upon hospital organizational outcome.

  19. 21 CFR 640.24 - Processing.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Processing. 640.24 Section 640.24 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS ADDITIONAL... Platelets shall be colorless and transparent to permit visual inspection of the contents; any closure shall...

  20. Use of the rhomboid flap after partial vulvectomy.

    PubMed

    Barnhill, D R; Hoskins, W J; Metz, P

    1983-10-01

    Primary closure of vulvar excisions is usually satisfactory in the anterior vulva, where the skin is mobile. In the posterior and posterolateral areas, however, closure often must be accomplished under tension with resulting wound breakdown and scar formation that can be disfiguring and cause dyspareunia. The rhomboid skin flap was described as early as 1946. Initially described for closure of facial defects, the technique has found application in the closure of a variety of traumatic and surgical defects. The authors present eight patients who underwent closure of vulvar defects using single or multiple rhomboid flaps. The applicability of the procedure to vulvar surgery is discussed and the technique is described.

  1. Cyanoacrylate closure of incompetent great, small and accessory saphenous veins without the use of post-procedure compression: Initial outcomes of a post-market evaluation of the VenaSeal System (the WAVES Study).

    PubMed

    Gibson, Kathleen; Ferris, Brian

    2017-04-01

    Purpose Cyanoacrylate closure of the great saphenous vein with the VenaSeal™ Closure System is a relatively new modality. Studies have been limited to moderate-sized great saphenous veins and some have mandated postoperative compression stockings. We report the results of a prospective study of cyanoacrylate closure for the treatment of great saphenous vein, small saphenous veins, and/or accessory saphenous veins up to 20 mm in diameter. Methods Fifty subjects with symptomatic great saphenous vein, small saphenous veins, and/or accessory saphenous veins incompetence were each treated at a single session. Compression stockings were not used post-procedure. Subjects returned to clinic at week 1 and again at one month. Post-procedure evaluations were performed at seven days and one month and included numerical pain rating score, revised venous clinical severity score, the Aberdeen Varicose Vein Questionnaire score, and time to return to work and normal activities. Duplex ultrasound was performed at each visit. Findings Procedural pain was mild (numerical pain rating scale 2.2 ± 1.8). All treated veins (48 great saphenous vein, 14 accessory saphenous veins, and 8 small saphenous veins) had complete closure by duplex ultrasound at seven days and one month. Mean time to return to work and normal activities was 0.2 ± 1.1 and 2.4 ± 4.1 days, respectively. The revised venous clinical severity score was improved to 1.8 ± 1.4 ( p < .001) and Aberdeen Varicose Vein Questionnaire score to 8.9 ± 6.6 ( p < .001) at one month. Phlebitis in the treatment area or side branches occurred in 10 subjects (20%) and completely resolved in all but one subject (2%) by one month; 98% of subjects were "completely" or "somewhat" satisfied, and 2% "unsatisfied" with the procedure at one month, despite the protocol disallowance of concomitant side branch treatment. Conclusions Cyanoacrylate closure is safe and effective for the treatment of one or more incompetent saphenous or accessory saphenous veins. Closure rates were high even in the absence of the use of compression stockings or side branch treatment. Time back to work or normal activities was short and improvements in venous severity scores and QOL were significant, comparing favorably with alternative treatment methods.

  2. Bioleach: a mathematical model for the joint evaluation of leachate and biogas production in urban solid waste landfills

    NASA Astrophysics Data System (ADS)

    Rodrigo-Clavero, Maria-Elena; Rodrigo-Ilarri, Javier

    2017-04-01

    One of the most serious environmental problems in modern societies is the management and disposal of urban solid waste (MSW). Despite the efforts of the administration to promote recycling and reuse policies and energy recovery technologies, nowadays the majority of MSW still is disposed in sanitary landfills. During the phases of operation and post-closure maintenance of any solid waste disposal site, two of the most relevant problems are the production of leachate and the generation of biogas. The leachate and biogas production formation processes occur simultaneously over time and are coupled together through the consumption and/or production of water. However, no mathematical models have been easily identified that allow to the evaluation of the joint production of leachate and biogas, during the operational and the post-closure phase of an urban waste landfill. This paper introduces BIOLEACH, a new mathematical model programmed on a monthly scale, that evaluates the joint production of leachate and biogas applying water balance techniques and considers the management of the landfill as a bioreactor. The application of such a model on real landfills allows to perform an environmentally sustainable management that minimizes the environmental impacts produced being also economically more profitable.

  3. 76 FR 15348 - Proposed Extension of the Approval of Information Collection Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-21

    ... property to be used for housing migrant agricultural workers shall not permit such housing to be occupied... conducted the housing safety and health inspection is posted at the site of the facility or real property. The certificate attests that the facility or real property meets applicable safety and health...

  4. 17 CFR 201.511 - Temporary cease-and-desist orders: Notice; procedures for hearing.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... place of the hearing. If an application is made ex parte, pursuant to § 201.513, no notice to a... submission of evidence or argument; and whether post-hearing submission of briefs, proposed findings of fact... the Commission's discretion. Factors the Commission may consider in determining whether to permit...

  5. 17 CFR 201.511 - Temporary cease-and-desist orders: Notice; procedures for hearing.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... place of the hearing. If an application is made ex parte, pursuant to § 201.513, no notice to a... submission of evidence or argument; and whether post-hearing submission of briefs, proposed findings of fact... the Commission's discretion. Factors the Commission may consider in determining whether to permit...

  6. 17 CFR 201.511 - Temporary cease-and-desist orders: Notice; procedures for hearing.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... place of the hearing. If an application is made ex parte, pursuant to § 201.513, no notice to a... submission of evidence or argument; and whether post-hearing submission of briefs, proposed findings of fact... the Commission's discretion. Factors the Commission may consider in determining whether to permit...

  7. 17 CFR 201.511 - Temporary cease-and-desist orders: Notice; procedures for hearing.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... place of the hearing. If an application is made ex parte, pursuant to § 201.513, no notice to a... submission of evidence or argument; and whether post-hearing submission of briefs, proposed findings of fact... the Commission's discretion. Factors the Commission may consider in determining whether to permit...

  8. 17 CFR 201.511 - Temporary cease-and-desist orders: Notice; procedures for hearing.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... place of the hearing. If an application is made ex parte, pursuant to § 201.513, no notice to a... submission of evidence or argument; and whether post-hearing submission of briefs, proposed findings of fact... the Commission's discretion. Factors the Commission may consider in determining whether to permit...

  9. 40 CFR 258.62 - Approval of site-specific flexibility requests in Indian country.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Closure and Post-Closure Care § 258.62... waste landfill owned and operated by Lake County on the Confederated Salish and Kootenai Tribes... equivalent reduction in infiltration as the infiltration layer specified in § 258.60(a)(1) and (a)(2), and...

  10. 40 CFR 266.103 - Interim status standards for burners.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...

  11. 40 CFR 266.103 - Interim status standards for burners.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...

  12. 40 CFR 266.103 - Interim status standards for burners.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...

  13. 40 CFR 266.103 - Interim status standards for burners.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...

  14. 40 CFR 266.103 - Interim status standards for burners.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...

  15. 40 CFR 264.146 - Use of a mechanism for financial assurance of both closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facilities by using a trust fund, surety bond, letter of credit, insurance, financial test, or corporate... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Use of a mechanism for financial... HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Financial Requirements § 264.146 Use of a...

  16. 76 FR 54788 - Notice of Permanent Closure of Public Lands in Clackamas and Multnomah Counties, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ..., State, and local government permittees and contractors conducting authorized activities; members of.... The BLM will post closure signs at main entry points to this area and take steps to install physical barriers at the BRWMU boundary. The affected lands will be represented as closed to public entry in maps...

  17. Relict basin closure accommodates continental convergence with minimal crustal shortening or deceleration of plate motion as inferred from detrital zircon provenance in the Caucasus

    NASA Astrophysics Data System (ADS)

    Cowgill, E.; Forte, A. M.; Niemi, N. A.; Avdeev, B.; Tye, A. R.; Trexler, C. C.; Javakhishvili, Z.; Elashvili, M.; Godoladze, T.

    2016-12-01

    Comparison of plate convergence with the timing and magnitude of upper-crustal shortening in collisional orogens indicates both shortening deficits (200-1700 km) and significant (30-40%) plate deceleration during collision, the cause(s) for which remain debated. The Greater Caucasus Mountains, which result from post-collisional Cenozoic closure of a relict Mesozoic back-arc basin on the northern margin of the Arabia-Eurasia collision zone, help reconcile these debates. Here we use U-Pb detrital zircon provenance data and the regional geology of the Caucasus to investigate the width of the now-consumed Mesozoic back-arc basin and its closure history. The provenance data record distinct southern and northern provenance domains that persisted until at least the Miocene; maximum basin width was likely 350-400 km. We propose that closure of the back-arc basin initiated at 35 Ma, coincident with initial (soft) Arabia-Eurasia collision along the Bitlis suture, eventually leading to 5 Ma (hard) collision between the Lesser Caucasus arc and the Scythian platform to form the Greater Caucasus Mountains. Final basin closure triggered deceleration of plate convergence and tectonic reorganization throughout the collision. Post-collisional subduction of such small (500-1000 km wide) relict ocean basins can account for both shortening deficits and delays in plate deceleration by accommodating convergence via subduction/underthrusting, although such shortening is easily missed if it occurs along structures hidden within flysch/slate belts. Relict-basin closure is likely typical early in continental collision at the end of a Wilson cycle due to the irregularity of colliding margins and extensive back-arc basin development during closure of long-lived ocean basins.

  18. 49 CFR 178.601 - General requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... proportion to the reduction in volume. (4) Variation 4. Variations are permitted in outer packagings of a... steel; (viii) An increase greater than 10% or any decrease in the steel thickness of the head, body, or... body), type (e.g., mechanically seamed or welded flange), and materials of closure (other than the...

  19. 49 CFR 178.601 - General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... proportion to the reduction in volume. (4) Variation 4. Variations are permitted in outer packagings of a... steel; (viii) An increase greater than 10% or any decrease in the steel thickness of the head, body, or... body), type (e.g., mechanically seamed or welded flange), and materials of closure (other than the...

  20. 49 CFR 178.601 - General requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... proportion to the reduction in volume. (4) Variation 4. Variations are permitted in outer packagings of a... steel; (viii) An increase greater than 10% or any decrease in the steel thickness of the head, body, or... body), type (e.g., mechanically seamed or welded flange), and materials of closure (other than the...

  1. Gonioscopy.

    PubMed

    Thomas, R; Thomas, S; Chandrashekar, G

    1998-12-01

    Gonioscopy forms part of a complete ophthalmic examination and is mandatory for the diagnosis and management of glaucoma. Gonioscopy permits identification of eyes at risk for closure and detects angle abnormalities that could have diagnostic and therapeutic implications. The technique of gonioscopy, its value in management, and guidelines for routine use are discussed in this paper.

  2. Seven-year follow-up of percutaneous closure of patent foramen ovale.

    PubMed

    Mirzada, Naqibullah; Ladenvall, Per; Hansson, Per-Olof; Johansson, Magnus Carl; Furenäs, Eva; Eriksson, Peter; Dellborg, Mikael

    2013-12-01

    Observational studies favor percutaneous closure of patent foramen ovale (PFO) over medical treatment to reduce recurrent stroke while randomized trials fail to demonstrate significant superiority of percutaneous PFO closure. Few long-term studies are available post PFO closure. This study reports long-term clinical outcomes after percutaneous PFO closure. Between 1997 and 2006, 86 consecutive eligible patients with cerebrovascular events, presumably related to PFO, underwent percutaneous PFO closure. All 86 patients were invited to a long-term follow-up, which was carried out during 2011 and 2012. Percutaneous PFO closure was successfully performed in 85 of 86 patients. The follow-up rate was 100%. No cardiovascular or cerebrovascular deaths occurred. Two patients (both women) died from lung cancer during follow-up. Follow-up visits were conducted for 64 patients and the remaining 20 patients were followed up by phone. The mean follow-up time was 7.3 years (5 to 12.4 years). Mean age at PFO closure was 49 years. One patient had a minor stroke one month after PFO closure and a transient ischemic attack (TIA) two years afterwards. One other patient suffered from a TIA six years after closure. No long-term device-related complications were observed. Percutaneous PFO closure was associated with very low risk of recurrent stroke and is suitable in most patients. We observed no mortality and no long-term device-related complications related to PFO closure, indicating that percutaneous PFO closure is a safe and efficient treatment even in the long term.

  3. Transcatheter Closure of Patent Ductus Arteriosus in Extremely Premature Newborns: Early Results and Midterm Follow-Up.

    PubMed

    Zahn, Evan M; Peck, Daniel; Phillips, Alistair; Nevin, Phillip; Basaker, Kaylan; Simmons, Charles; McRae, Marion E; Early, Tracy; Garg, Ruchira

    2016-12-12

    The goal of this study was to describe early and midterm outcomes of extremely premature newborns (EPNs) who underwent transcatheter echocardiographically guided patent ductus arteriosus (PDA) closure. Surgical ligation of PDA in EPNs confers significant risk for procedural morbidity and adverse long-term outcomes. The Amplatzer Vascular Plug II was used in all cases. Post-ligation syndrome was defined using previously published parameters. Patients were followed at pre-specified intervals, and prospectively collected data were reviewed. Transcatheter closure was attempted in 24 EPNs (mean procedural age 30 days [range 5 to 80 days], mean procedural weight 1,249 g [range 755 to 2,380 g]) and was successful in 88%. The 3 procedural failures were related to the development of left pulmonary artery (LPA) stenosis caused by the device, and all devices were removed uneventfully. Complications included 2 instances of device malposition, resolved with device repositioning, and 1 instance of LPA stenosis, requiring an LPA stent. There were no procedural deaths, cases of post-ligation syndrome, residual PDA, or device embolization. Survival to discharge was 96% (23 of 24), with a single late death unrelated to the procedure. After a median follow-up period of 11.1 months, all patients were alive and well, with no residual PDA or evidence of LPA or aortic coarctation. This newly described technique can be performed safely with a high success rate and minimal procedural morbidity in EPNs. Early and midterm follow-up is encouraging. Future efforts should be directed toward developing specific devices for this unique application. Copyright © 2016 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.

  4. Thinning regimes and initial spacing for Eucalyptus plantations in Brazil.

    PubMed

    Ferraz Filho, Antonio C; Mola-Yudego, Blas; González-Olabarria, José R; Scolforo, José Roberto S

    2018-01-01

    This study focuses on the effects of different thinning regimes on clonal Eucalyptus plantations growth. Four different trials, planted in 1999 and located in Bahia and Espírito Santo States, were used. Aside from thinning, initial planting density, and post thinning fertilization application were also evaluated. Before canopy closure, and therefore before excessive competition between trees took place, it was found that stands planted under low densities (667 trees per hectare) presented a lower mortality proportion when compared to stand planted under higher densities (1111 trees per hectare). However, diameter growth prior to thinning operations was not statistically different between these two densities, presenting an overall mean of 4.9 cm/year. After canopy closure and the application of the thinning treatments, it was found that thinning regimes beginning early in the life of the stand and leaving a low number of residual trees presented the highest diameter and height growth. Unthinned treatments and thinning regimes late in the life of the stand (after 5.5 years), leaving a large number of residual trees presented the highest values of basal area production. The choice of the best thinning regime for Eucalyptus clonal material will vary according to the plantation objective.

  5. 77 FR 27174 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-09

    ..., proposed rule to revise the regulations for permits for nonpurposeful take of golden eagles (Aquila... will post all comments on http:/www.regulations.gov. This generally means that we will post any... of golden eagles (Aquila chrysaetos) and bald eagles (Haliaeetus leucocephalus), where the take is...

  6. Department of Defense Base Reuse Implementation Manual, DOD 4165.66-M

    DTIC Science & Technology

    1997-12-01

    applications? SPECIAL CONSIDERATION In the case of representatives of the homeless whose applications have been approved by HHS under Title V of the...2) In the case of installations approved for closure under a base closure law before the date of the enactment of this Act, not later than 15 days...realignment, as the case may be, of such installation under the applicable base closure law expires. (3) The term "redevelopment authority", in the case

  7. 75 FR 77229 - Federal Requirements Under the Underground Injection Control (UIC) Program for Carbon Dioxide (CO2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ...This action finalizes minimum Federal requirements under the Safe Drinking Water Act (SDWA) for underground injection of carbon dioxide (CO2) for the purpose of geologic sequestration (GS). GS is one of a portfolio of options that could be deployed to reduce CO2 emissions to the atmosphere and help to mitigate climate change. This final rule applies to owners or operators of wells that will be used to inject CO2 into the subsurface for the purpose of long-term storage. It establishes a new class of well, Class VI, and sets minimum technical criteria for the permitting, geologic site characterization, area of review (AoR) and corrective action, financial responsibility, well construction, operation, mechanical integrity testing (MIT), monitoring, well plugging, post-injection site care (PISC), and site closure of Class VI wells for the purposes of protecting underground sources of drinking water (USDWs). The elements of this rulemaking are based on the existing Underground Injection Control (UIC) regulatory framework, with modifications to address the unique nature of CO2 injection for GS. This rule will help ensure consistency in permitting underground injection of CO2 at GS operations across the United States and provide requirements to prevent endangerment of USDWs in anticipation of the eventual use of GS to reduce CO2 emissions to the atmosphere and to mitigate climate change.

  8. Why do nursing homes close? An analysis of newspaper articles.

    PubMed

    Fisher, Andrew; Castle, Nicholas

    2012-01-01

    Using Non-numerical Unstructured Data Indexing Searching and Theorizing (NUD'IST) software to extract and examine keywords from text, the authors explored the phenomenon of nursing home closure through an analysis of 30 major-market newspapers over a period of 66 months (January 1, 1999 to June 1, 2005). Newspaper articles typically represent a careful analysis of staff impressions via interviews, managerial perspectives, and financial records review. There is a current reliance on the synthesis of information from large regulatory databases such as the Online Survey Certification And Reporting database, the California Office of Statewide Healthcare Planning and Development database, and Area Resource Files. Although such databases permit the construction of studies capable of revealing some reasons for nursing home closure, they are hampered by the confines of the data entered. Using our analysis of newspaper articles, the authors are able to add further to their understanding of nursing home closures.

  9. Engineering criteria for fracture flowback procedures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barree, R.D.; Mukherjee, H.

    1995-12-31

    Post treatment fracture flowback procedures during closure are often critical to the retention of fracture conductivity near the wellbore. Postfrac production performance largely depends on this conductivity. The importance of proper flowback procedure has been documented in the fracture industry, but definitive guidelines for flowback design have never been established. As a result, many misconceptions exist regarding the physics of proppant flowback and its effects on the final proppant distribution in the fracture. This paper presents a rigorous study of fracture flowback and proppant migration during closure using a fully three-dimensional fracture geometry simulator (GOHFER). The effects of rate ofmore » flowback, location of the perforation interval, final proppant concentration, and the fracture geometry prior to flowback on the retained post closure proppant concentration are discussed. Consideration is given to the fluid velocity field in the created fracture resulting from the flowback, and its effects on proppant movement and localized fracture closure. These studies illustrate the difference between ``forced closure`` and ``reverse screenout`` concepts in flowback design. Other effects such as crossflow between multiple perforated layers are also studied. Simulation studies indicate that selection of a desirable flowback rate is very sensitive to crossflow effects resulting from induced fractures in multiple stress layers. This crossflow can result in significant overflushing of proppant in the lower stress zones, if not countered by properly applied flowback procedures.« less

  10. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.« less

  11. The immediate use of a silicone sheet wound closure device in scar reduction and prevention.

    PubMed

    Parry, James R; Stupak, Howard D; Johnson, Calvin M

    2016-02-01

    Silicone has been used successfully postoperatively in the prevention of hypertrophic and other types of adverse scars. The Silicone Suture Plate (SSP) is a new, minimally invasive, sterile wound closure device that is applied intraoperatively to prevent adverse scarring. The SSP device permits immediate application of silicone while concurrently allowing for wound-edge tension redistribution. In this prospective, controlled, single-blinded clinical study, 8 consecutive patients undergoing deep-plane rhytidectomy were selected. SSP devices were placed on the patients' posterior rhytidectomy hairline incision; the mirror-image control site underwent standard suturing techniques. Three blinded, independent raters assessed the treatment and control sides at 6-week and 4-month follow-up visits, using the Objective Scar Assessment Scale (OSAS), a validated scar assessment tool. The 6-week OSAS scores revealed an 18.4% improvement on the side with the SSP device (13.3) when compared to the control side (16.3). The 4-month OSAS scores showed a 27.3% improvement on the treatment side from 12.7 (control) to 9.2 (SSP). These OSAS results were found to be statistically significant when taken as an aggregate of the observers' scores, but not when observers' scores were measured individually (p < 0.05). In our series of patients, we showed promising results with the use of the SSP device. Early silicone application and tissue tension distribution contributed to an overall more aesthetically pleasing scar compared to those seen with standard suturing techniques, although more testing is required.

  12. Pelvic flexure enterotomy closure in the horse with a TA-90 stapling device: A retrospective clinical study of 84 cases (2001–2008)

    PubMed Central

    Rosser, Julie; Brounts, Sabrina; Slone, Don; Lynch, Tim; Livesey, Michael; Hughes, Faith; Clark, Carol

    2012-01-01

    Our objective was to compare survival and complication rates of horses undergoing pelvic flexure enterotomy closure with a TA-90 stapler to those with hand-sewn closure. Medical records of horses undergoing pelvic flexure enterotomy between 2001 and 2008 were reviewed. History, clinical signs, surgical findings, surgical techniques, and post-operative complications were recorded. Long-term outcome was established by telephone questionnaire. Of 84 pelvic flexure enterotomies performed, 70 were stapled and 14 were hand-sewn. Seventy-seven horses survived to discharge (91.7%). There were no significant associations between survival and closure technique (P = 0.69). Follow-up was available for 54 horses; 50 survived long-term (93.0%). No statistical significance was identified between long-term survival and closure method (P = 0.39). Forty horses went on to athletic performance (80.0%). TA-90 stapled closure of pelvic flexure enterotomies is a safe technique resulting in survival and complication rates equivalent to those of hand-sewn closure. PMID:23204584

  13. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada For Fiscal Year 2012 (October 2011–September 2012)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2013-01-17

    This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): · CAU 90, Area 2 Bitcutter Containment · CAU 91, Area 3 U-3fi Injection Well · CAU 92, Area 6 Decon Pond Facility · CAU 110, Area 3 WMD U-3ax/bl Crater · CAU 111, Area 5 WMD Retired Mixed Waste Pits · CAU 112, Area 23 Hazardous Waste Trenches This report covers fiscal year 2012 (October 2011–September 2012).

  14. Climate change and landscape development in post-closure safety assessment of solid radioactive waste disposal: Results of an initiative of the IAEA.

    PubMed

    Lindborg, T; Thorne, M; Andersson, E; Becker, J; Brandefelt, J; Cabianca, T; Gunia, M; Ikonen, A T K; Johansson, E; Kangasniemi, V; Kautsky, U; Kirchner, G; Klos, R; Kowe, R; Kontula, A; Kupiainen, P; Lahdenperä, A-M; Lord, N S; Lunt, D J; Näslund, J-O; Nordén, M; Norris, S; Pérez-Sánchez, D; Proverbio, A; Riekki, K; Rübel, A; Sweeck, L; Walke, R; Xu, S; Smith, G; Pröhl, G

    2018-03-01

    The International Atomic Energy Agency has coordinated an international project addressing climate change and landscape development in post-closure safety assessments of solid radioactive waste disposal. The work has been supported by results of parallel on-going research that has been published in a variety of reports and peer reviewed journal articles. The project is due to be described in detail in a forthcoming IAEA report. Noting the multi-disciplinary nature of post-closure safety assessments, here, an overview of the work is given to provide researchers in the broader fields of radioecology and radiological safety assessment with a review of the work that has been undertaken. It is hoped that such dissemination will support and promote integrated understanding and coherent treatment of climate change and landscape development within an overall assessment process. The key activities undertaken in the project were: identification of the key processes that drive environmental change (mainly those associated with climate and climate change), and description of how a relevant future may develop on a global scale; development of a methodology for characterising environmental change that is valid on a global scale, showing how modelled global changes in climate can be downscaled to provide information that may be needed for characterising environmental change in site-specific assessments, and illustrating different aspects of the methodology in a number of case studies that show the evolution of site characteristics and the implications for the dose assessment models. Overall, the study has shown that quantitative climate and landscape modelling has now developed to the stage that it can be used to define an envelope of climate and landscape change scenarios at specific sites and under specific greenhouse-gas emissions assumptions that is suitable for use in quantitative post-closure performance assessments. These scenarios are not predictions of the future, but are projections based on a well-established understanding of the important processes involved and their impacts on different types of landscape. Such projections support the understanding of, and selection of, plausible ranges of scenarios for use in post-closure safety assessments. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  15. Use of Viable Cryopreserved Umbilical Tissue for Soft Tissue Defects in Patients With Gas Gangrene: A Case Series.

    PubMed

    McGinness, Kristen; Kurtz Phelan, Dorothy H

    2018-04-01

    Gas gangrene is a rapidly progressive bacterial infection leading to necrosis that usually develops as a result of trauma or postoperative complications. This condition requires early diagnosis with immediate surgical intervention. With a poor prognosis, a high incidence of amputation, and comorbidities such as diabetes and peripheral vascular disease, patients with gas gangrene are put at further risk for surgical complications. This case series reports the clinical outcomes of using a commercially available viable cryopreserved umbilical tissue (vCUT) in the surgical management of 10 patients (9 males, 1 female) with acute lower extremity gas gangrene. All 10 patients had aggressive debridement and irrigation, followed by an intraoperative application of vCUT to cover the large, complex wounds with exposed bone, tendon, and soft tissue, which was fenestrated and sutured to the surrounding skin edges. The average wound size following debridement was 45.9 cm2 (range, 8 cm2-105 cm2). Average percent area reduction of the wounds at 4 weeks post-vCUT application was 68.4% (range, 49%-99.5%). The average length of hospital stay was 9 days (range, 2-16 days), and postdischarge patients were treated with negative pressure wound therapy and standard of care (nonadherent dressing, dry gauze, and mild compression) until wound closure was achieved (average, 3.3 months [range, 1.25-4.5 months]). With a 1-time application of vCUT, all patients reached complete wound closure with decreased time to closure, fewer complications, and a shorter duration of hospitalization as compared with traditional inpatient management of gas gangrene (incision and drainage with staged procedures). The positive clinical outcomes indicate that vCUT may be an effective aid as an intraoperative application to cover wounds following aggressive debridement in the presence of gas gangrene.

  16. Post-Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada for Calendar Year 2016 (January 2016–December 2016), Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are evaluatedmore » to determine whether the UR boundaries remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Additionally, monitoring data are used to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries (CBs) calculated with the models are the primary basis of the UR boundaries. In summary, the monitoring results from 2016 indicate the regulatory controls on the closure of CAU 98 remain effective in protection of human health and the environment. Recommendations resulting from this first year of monitoring activities include formally incorporating wells UE-5 PW-1, UE-5 PW-2, and UE-5 PW-3 into the groundwater-level monitoring network given their strategic location in the basin; and early development of a basis for trigger levels for the groundwater-level monitoring given the observed trends. Additionally, it is recommended to improve the Real Estate/Operations Permit process for capturing information important for evaluating the impact of activities on groundwater resources, and to shift the reporting requirement for this annual report from the second quarter of the federal fiscal year (end of March) to the second quarter of the calendar year (end of June).« less

  17. Effect of a single prophylactic preoperative oral antibiotic dose on surgical site infection following complex dermatological procedures on the nose and ear: a prospective, randomised, controlled, double-blinded trial.

    PubMed

    Rosengren, Helena; Heal, Clare F; Buttner, Petra G

    2018-04-19

    There is limited published research studying the effect of antibiotic prophylaxis on surgical site infection (SSI) in dermatological surgery, and there is no consensus for its use in higher-risk cases. The objective of this study was to determine the effectiveness of a single oral preoperative 2 g dose of cephalexin in preventing SSI following flap and graft dermatological closures on the nose and ear. Prospective double-blinded, randomised, placebo-controlled trial testing for difference in infection rates. Primary care skin cancer clinics in North Queensland, Australia, were randomised to 2 g oral cephalexin or placebo 40-60 min prior to skin incision. 154 consecutive eligible patients booked for flap or graft closure following skin cancer excision on the ear and nose. 2 g dose of cephalexin administered 40-60 min prior to surgery. Overall 8/69 (11.6%) controls and 1/73 (1.4%) in the intervention group developed SSI (p=0.015; absolute SSI reduction 10.2%; number needed to treat (NNT) for benefit 9.8, 95% CI 5.5 to 45.5). In males, 7/44 controls and 0/33 in the intervention group developed SSI (p=0.018; absolute SSI reduction 15.9%; NNT for benefit 6.3, 95% CI 3.8 to 19.2). SSI was much lower in female controls (1/25) and antibiotic prophylaxis did not further reduce this (p=1.0). There was no difference between the study groups in adverse symptoms attributable to high-dose antibiotic administration (p=0.871). A single oral 2 g dose of cephalexin given before complex skin closure on the nose and ear reduced SSI. ANZCTR 365115; Post-results. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  18. NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nikolich, George; Mizell, Steve; McCurdy, Greg

    2017-10-01

    Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans thatmore » are being developed, which will facilitate the appropriate closure design and post-closure monitoring.« less

  19. Lace Up for Healthy Feet: The Impact of Shoe Closure on Plantar Stress Response.

    PubMed

    Rahemi, Hadi; Armstrong, David G; Enriquez, Ana; Owl, Joshua; Talal, Talal K; Najafi, Bijan

    2017-07-01

    This study examined the impact of shoe closure on plantar thermal stress response (TSR), which is known to be a surrogate of shear stress and skin perfusion. It is aimed to explore potential impact of shoe closure on increasing risk factors associated with plantar ulcers in people with diabetic peripheral neuropathy (DPN). Fifteen eligible subjects were enrolled. The left foot was used as a reference and fitted to a self-adjusted and habitual lace-tightening method by each subject. The right foot was used as a test closure and fitted into three lace closure conditions: loose, tight, and preset optimal closure (reel clutch, BOA technology). Thermal images were taken after 5 minutes of acclimatization (pre-trial) and immediately after 200 walking steps in each shoe closure condition (post-trial). TSR was calculated from the thermal images. TSR was significantly higher in the test closure with loose (70.24%, P = .000) and tight (66.85%, P = .007) and lower (-206.53%, P = .000) in the preset optimal closure when compared to the reference closure. Only lace closure conditions affected TSR with no significant impact from age, BMI, and gender in our sample in a multivariable regression model. The results from this study suggest that shoelace closure technique can have a profound effect on TSR. It therefore stands to reason that optimal lace closure may have an impact in reducing risk of plantar ulcers in people with DPN. Interestingly, results revealed that even a self-adjusted lace closure may not be necessarily optimal and a preset closure setting like reel clutch might ultimately be recommended to minimize risk. Further study is warranted to confirm or refute these interesting results.

  20. Novel application of polyelectrolyte multilayers as nanoscopic closures with hermetic sealing.

    PubMed

    Marcott, Stephanie A; Ada, Sena; Gibson, Phillip; Camesano, Terri A; Nagarajan, R

    2012-03-01

    Closure systems for personnel protection applications, such as protective clothing or respirator face seals, should provide effective permeation barrier to toxic gases. Currently available mechanical closure systems based on the hook and loop types (example, Velcro) do not provide adequate barrier to gas permeation. To achieve hermetic sealing, we propose a nonmechanical, nanoscopic molecular closure system based on complementary polyelectrolyte multilayers, one with a polycation outermost layer and the other with a polyanion outermost layer. The closure surfaces were prepared by depositing polyelectrolyte multilayers under a variety of deposition conditions, on conformable polymer substrates (thin films of polyethylene teraphthalate, PET or polyimide, PI). The hermetic sealing property of the closures was evaluated by measuring the air flow resistance using the dynamic moisture permeation cell (DMPC) at different humidity conditions. The DMPC measurements show that the polyelectrolyte multilayer closures provide significantly large resistance to air flow, approximately 20-800 times larger than that possible with conventional hook and loop type closure systems, at all humidity levels (from 5 to 95% relative humidity). Hence, from the point of view of providing a hermetic seal against toxic gas permeation, the polyelectrolyte multilayer closures are viable candidates for further engineering development. However, the adhesive strength of the multilayer closures measured by atomic force microscopy suggests that the magnitude of adhesion is much smaller than what is possible with mechanical closures. Therefore, we envisage the development of a composite closure system combining the mechanical closure to provide strong adhesion and the multilayer closure to provide hermetic sealing. © 2012 American Chemical Society

  1. 40 CFR 267.112 - What procedures must I follow?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What procedures must I follow? 267.112 Section 267.112 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Closure § 267.112 What procedures...

  2. 10 CFR 60.111 - Performance of the geologic repository operations area through permanent closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... retrieval throughout the period during which wastes are being emplaced and, thereafter, until the completion of a preformance confirmation program and Commission review of the information obtained from such a... retrievability. (3) For purposes of this paragraph, a reasonable schedule for retrieval is one that would permit...

  3. 10 CFR 60.111 - Performance of the geologic repository operations area through permanent closure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... retrieval throughout the period during which wastes are being emplaced and, thereafter, until the completion of a preformance confirmation program and Commission review of the information obtained from such a... retrievability. (3) For purposes of this paragraph, a reasonable schedule for retrieval is one that would permit...

  4. 10 CFR 60.111 - Performance of the geologic repository operations area through permanent closure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... retrieval throughout the period during which wastes are being emplaced and, thereafter, until the completion of a preformance confirmation program and Commission review of the information obtained from such a... retrievability. (3) For purposes of this paragraph, a reasonable schedule for retrieval is one that would permit...

  5. 10 CFR 60.111 - Performance of the geologic repository operations area through permanent closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... retrieval throughout the period during which wastes are being emplaced and, thereafter, until the completion of a preformance confirmation program and Commission review of the information obtained from such a... retrievability. (3) For purposes of this paragraph, a reasonable schedule for retrieval is one that would permit...

  6. 40 CFR 267.110 - Does this subpart apply to me?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Does this subpart apply to me? 267.110 Section 267.110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... PERMIT Closure § 267.110 Does this subpart apply to me? This subpart applies to you if you own or operate...

  7. 40 CFR 267.110 - Does this subpart apply to me?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Does this subpart apply to me? 267.110 Section 267.110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... PERMIT Closure § 267.110 Does this subpart apply to me? This subpart applies to you if you own or operate...

  8. 40 CFR 267.110 - Does this subpart apply to me?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Does this subpart apply to me? 267.110 Section 267.110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... PERMIT Closure § 267.110 Does this subpart apply to me? This subpart applies to you if you own or operate...

  9. 40 CFR 267.110 - Does this subpart apply to me?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Does this subpart apply to me? 267.110 Section 267.110 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... PERMIT Closure § 267.110 Does this subpart apply to me? This subpart applies to you if you own or operate...

  10. 76 FR 60557 - Closure of the U.S. Nuclear Regulatory Commission's Two White Flint North Building Entrance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Two White Flint North Building Entrance AGENCY: Nuclear Regulatory Commission. ACTION: Notice of... through the recently renovated One White Flint North (OWFN) building entrance lobby. Only NRC badged employees and contractors shall be permitted to use the Two White Flint North (TWFN) building entrance. NRC...

  11. 9 CFR 354.244 - Temperatures and cooling and freezing procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... wrapped or packaged in water-vapor resistant cartons or the containers should be lined with heavy water... carcasses and to permit unsealed closure or sealing in such a manner that water-vapor loss from the product... cooling tank containing running cold tap water to remove the animal heat from the carcass. Carcasses shall...

  12. 9 CFR 354.244 - Temperatures and cooling and freezing procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... wrapped or packaged in water-vapor resistant cartons or the containers should be lined with heavy water... carcasses and to permit unsealed closure or sealing in such a manner that water-vapor loss from the product... cooling tank containing running cold tap water to remove the animal heat from the carcass. Carcasses shall...

  13. 9 CFR 354.244 - Temperatures and cooling and freezing procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... wrapped or packaged in water-vapor resistant cartons or the containers should be lined with heavy water... carcasses and to permit unsealed closure or sealing in such a manner that water-vapor loss from the product... cooling tank containing running cold tap water to remove the animal heat from the carcass. Carcasses shall...

  14. 9 CFR 354.244 - Temperatures and cooling and freezing procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... wrapped or packaged in water-vapor resistant cartons or the containers should be lined with heavy water... carcasses and to permit unsealed closure or sealing in such a manner that water-vapor loss from the product... cooling tank containing running cold tap water to remove the animal heat from the carcass. Carcasses shall...

  15. Application of WebGIS for traffic risk assessment

    NASA Astrophysics Data System (ADS)

    Voumard, Jérémie; Aye, Zar Chi; Derron, Marc-Henri; Jaboyedoff, Michel

    2015-04-01

    Roads and railways are threatened throughout the year by several natural hazards around the world, leading to the closing of transportation corridors, loss of access, deviation travels and potentially infrastructures damages and loss of human lives and also financial, social and economic consequences. Protection measures used to reduce the exposure to natural hazards are usually expensive and cannot be deployed on an entire transportation network. It is thus necessary to choose priority areas where protection measures need to be built. The aim of this study is to propose a friendly tool to evaluate and to understand issues and consequences of section closing and affected parts of a transportation network at small region scale. The proposed tool, currently in its design and building phase, will provide ways to simulate different closure scenarios and to analyze their consequences on transportation network; like deviating traffic on others roads and railways sections, additional time and distance travel or accessibility for emergency services like police, firefighters and ambulances. The tool is based on OpenGeo architecture, which is composed of open-source components. It integrates PostGIS for database, GeoServer and GeoWebCache for application servers and finally GeoExt and OpenLayers for user interface. Users will be able to attribute quantitative (like roads and railway type and closure consequences) and qualitative (like section unavailability duration, season, etc.) data to the different roads and railways sections based on their user rights. They will also be able to evaluate different track closures consequences in terms of different scenarios. Once finalized, the goal of this project including natural hazards, traffic and geomatic thematic is to propose a decision support tool for public authorities firstly and for specialists secondly so that they can evaluate easily and accurately as much as possible to highlight the weakpoints of the transportation network in the case track closures due to natural hazards.

  16. Transcatheter closure of a large patent ductus arteriosus using jugular access in an infant.

    PubMed

    Fernandes, Precylia; Assaidi, Anass; Baruteau, Alban-Elouen; Fraisse, Alain

    2018-03-01

    Trans-catheter device closure of patent ductus arteriosus (PDA) via femoral route is the commonly used, safe and effective procedure. Trans-jugular approach has been successfully used in older children with interrupted inferior vena cava. We report a case of successful occlusion of PDA using Amplatzer duct occluder (ADO) via trans-jugular approach following difficulties encountered in gaining femoral venous access. A 6-month-old male infant, weighing 8 kg was admitted for percutaneous catheter closure of PDA. Echocardiogram showed a 4.5 mm duct and left heart dilatation. Femoral venous access was not possible; therefore, we decided to use a trans-jugular approach. The duct was occluded using 8/6 mm ADO. Successful closure of the duct was confirmed with an aortogram. Post procedure echocardiogram showed no residual shunt across the duct. We highlight that trans-catheter closure of PDA using jugular venous access is safe and effective even in infants.

  17. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less

  18. [Factors influencing the prognosis of patent ductus arteriosus in very low birth weight infants].

    PubMed

    Wang, Chen-Hong; Shi, Li-Ping; Ma, Xiao-Lu; Luo, Fang; Chen, Zheng; Lin, Hui-Jia; DU, Li-Zhong

    2016-08-01

    To investigate the factors influencing the prognosis of patent ductus arteriosus (PDA) in very low birth weight (VLBW) infants. A total of 194 VLBW infants who were admitted from January 2012 to December 2014 were enrolled as study subjects. According to cardiac ultrasound findings and treatment outcome, these infants were divided into non-PDA group, spontaneous closure group, pharmaceutical closure group, and surgical closure group. Their clinical and echocardiographic characteristics were analyzed. The spontaneous closure rate of PDA was 58.7%. The spontaneous closure group showed significantly higher gestational age, birth weight, and proportion of small-for-gestational-age infants than the pharmaceutical and surgical closure groups (P<0.05). The pharmaceutical and surgical closure groups had a significantly higher incidence rate of neonatal respiratory distress syndrome and a significantly higher proportion of infants who were given pulmonary surfactant (PS) than the spontaneous closure group (P<0.05). During different periods of time, the spontaneous closure group had a significantly smaller ductus arteriosus diameter than the pharmaceutical and surgical closure groups (P<0.05). The multivariate logistic regression analysis showed that gestational age, application of PS, and ductus arteriosus diameter at 48 hours were significantly associated with the prognosis of PDA. The major transductal flow pattern in the spontaneous closure group was closing pattern, while in the pharmaceutical and surgical closure groups, the main flow patterns were pulmonary hypertension and growing patterns within 48 hours and growing pattern on days 4 and 7. The VLBW infants have a high spontaneous closure rate of PDA. A decreased closure rate of PDA is associated with the lower gestational age and the application of PS. PDA with a large ductus arteriosus diameter and a growing or pulsatile flow pattern cannot easily achieve spontaneous closure.

  19. 77 FR 53898 - Collection of Information Under Review by Office of Management and Budget

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... following collections of information: 1625-0016, Welding and Hot Work Permits; Posting of Warning Signs.... Title: Welding and Hot Work Permits; Posting of Warning Signs. OMB Control Number: 1625-0016. Type of... facilities and vessels are in compliance with safety standards. A permit must be issued prior to welding or...

  20. Transient left ventricular systolic dysfunction following surgical closure of large patent ductus arteriosus among children and adolescents operated at the cardiac centre, Ethiopia.

    PubMed

    Tilahun, Birkneh; Tefera, Endale

    2013-05-31

    Patent ductus arteriosus (PDA) is one of the commonest congenital heart diseases that require closure within the first few months after birth. The residential area of patients affects the size of the PDA: living in highlands, like most places in Ethiopia, is a risk for having larger sized PDA. Closure of these congenital heart defects is usually performed at an early age in places where capable centers are available. In Ethiopia, closure of these defects is done on mission basis often at an older age. Recently, limited reports came about the occurrence of postoperative left ventricular systolic dysfunction (POLVD) following closure of PDA though full explanation is still lacking. To determine the rate of and time to improvement of POLVD and the factors associated with it in children and adolescents who underwent surgical closure of PDA. All children and adolescents who underwent surgical closure of PDA at the Cardiac Center, Ethiopia (CCE) had postoperative follow up with echocardiography. Serial left ventricular ejection fraction (LVEF) and fiber shortening (FS) values were recorded for all of them. SPSS 20 was used to analyze the data. A total of 36 children and adolescents who underwent surgical closure of PDA from January 2009 to December 2012 and who fulfilled the inclusion criteria were studied. Their mean age at intervention was 8.52 years (SD = 5.23 years), 77.80% were females. The mean duct size as determined by either echocardiography or intra-operative by the surgeon was 10.31 mm (SD = 3.20 mm). They were followed for a mean duration of 24.80 months (SD = 12.36 months) following surgical closure of PDA. The mean LVEF and FS decreased from 65.06% and 35.28% preoperatively to 54.83% and 28.40% post-operatively respectively. Fifteen (42.86%) of the patients had a post-operative LVEF of less than 55%. The mean time to normalization of systolic function was 5.11 weeks (SD = 3.30 weeks). Having an associated cardiac lesion was an independent predictor of POLVD. We conclude that there is a high rate of POLVD following surgical closure of large PDA in highlanders. We recommend a serial and systematic follow up of these children postoperatively. Those with a significant cardiac dysfunction may need cardiac medications like Angiotensin Converting Enzyme Inhibitors (ACEI).

  1. Chemical Waste Landfill Annual Post-Closure Care Report Calendar Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, Michael Marquand; Little, Bonnie Colleen

    The CWL is a 1.9-acre remediated interim status landfill located in the southeastern corner of SNL/NM Technical Area III (Figures 2-1 and 2-2) undergoing post-closure care in accordance with the PCCP (NMED October 2009 and subsequent revisions). From 1962 until 1981, the CWL was used for the disposal of chemical and solid waste generated by SNL/NM research activities. Additionally, a small amount of radioactive waste was disposed of during the operational years. Disposal of liquid waste in unlined pits and trenches ended in 1981, and after 1982 all liquid waste disposal was terminated. From 1982 through 1985, only solid wastemore » was disposed of at the CWL, and after 1985 all waste disposal ended. The CWL was also used as a hazardous waste drum-storage facility from 1981 to 1989. A summary of the CWL disposal history is presented in the Closure Plan (SNL/NM December 1992) along with a waste inventory based upon available disposal records and information.« less

  2. Displacement in new economy labor markets: Post-displacement wage loss in high tech versus low tech cities.

    PubMed

    Davis, Daniel J; Rubin, Beth A

    2016-11-01

    While scholars and politicians tout education as the salve to employment disruptions, we argue that the geography of the new economy, and the social closure mechanisms that geography creates, may be just as important as individuals' characteristics for predicting post-displacement wage loss (or gain). We use data from the 2012 Displaced Workers ement of the Current Population Survey and from the 2010 United States Census to test hypotheses linking local labor markets in different industrial contexts to post-displacement wage loss. Our results point to age as a closure mechanism, and to the partially protective effect of education in high-tech versus low-tech economic sectors. This study is the first to use national level data to examine how employment in high-tech cities influences post-displacement wages. These findings are relevant both for theorizing about the new economy and for public policy. Copyright © 2016 Elsevier Inc. All rights reserved.

  3. Resident-performed laser peripheral iridotomy in primary angle closure, primary angle closure suspects, and primary angle closure glaucoma.

    PubMed

    Kam, Jason P; Zepeda, Emily M; Ding, Leona; Wen, Joanne C

    2017-01-01

    To investigate the power use and complication frequency of resident-performed laser peripheral iridotomy (LPI). A retrospective analysis of 196 eyes from 103 patients who underwent neodymium: yttrium-aluminum-garnet laser iridotomy performed by resident physicians from January 1, 2010 through April 30, 2015 at a university-based county hospital was done. All patients were treated for primary angle closure, primary angle closure suspects, and primary angle closure glaucoma. Data were collected on pre- and post-laser intraocular pressure (IOP), ethnicity, laser parameters and complications. Mean power use and frequency of complications were evaluated. Complications included elevated post-laser IOP at 30-45 minutes (≥8 mmHg), hyphema, aborted procedures, and lasering non-iris structures. The number of repeated LPI procedures, was also recorded. Mean total power used for all residents was 78.2±68.7 mJ per eye. Power use by first-year trainees was significantly higher than second- and third-year trainees (103.5±75.5 mJ versus 73.7±73.8 mJ and 67.2±56.4 mJ, respectively, p =0.011). Complications included hyphema or microhyphema in 17.9% (35/196), IOP spikes in 5.1% (10/196), aborted procedures in 1.1% (3/196) and lasering non-iris structures in 0.5% (1/196). LPI was repeated in 22.4% of cases (44/196) with higher incidence of repeat LPI among non-Caucasian compared to the Caucasian subjects ( p =0.02). Complication rates did not differ with increased training ( p =0.16). Total power used for LPI decreased with increased resident training, while the complication rate did not differ significantly among resident classes. Complication rates were comparable to rates reported in the literature for attending-performed LPIs.

  4. Changes in the management of deep sternal wound infections: a 12-year review.

    PubMed

    Lonie, Sarah; Hallam, Jane; Yii, Michael; Davis, Philip; Newcomb, Andrew; Nixon, Ian; Rosalion, Alexander; Ricketts, Sophie

    2015-11-01

    Deep sternal wound infection (DSWI) is a rare but life-threatening complication following cardiac surgery associated with increased morbidity and mortality. Management of these patients has evolved over the years and can include sternal rewiring, mediastinal irrigation, negative-pressure wound therapy (NPWT) dressing or repair with flaps. We reviewed changes in our management of DSWI and outcomes. Using the Australian and New Zealand Society of Cardiac and Thoracic Surgeons database, 5472 underwent cardiac surgery at St Vincent's Hospital, Melbourne, and 42 were identified as developing DSWI requiring re-operation between June 2002 and September 2014. Data were collected pertaining to risk factors for DSWI, management strategies and outcomes. Patients were compared from a period prior to NPWT dressing use (June 2002-February 2006, n = 14) and since the NPWT has been used regularly in the management of DSWI (from March 2006, n = 28). Patients were also compared based on the requirement for flap closure of their sternal wound. Because of the widespread use of NPWT dressings, there is a trend towards fewer sternal infections requiring flap closure (25 versus 42.8%) and less post-operative complications after definitive closure (7.1 versus 28.6%). Before and after widespread NPWT use, patients require similar number of re-operations before closure and have no significant differences in time to definitive closure or length of hospital stay. The use of NPWT dressings as a bridge to definitive closure may reduce the need for more burdensome flap reconstruction, does not delay definitive reconstruction or prolong hospital stay and may reduce post-reconstruction complications requiring re-operation. © 2015 Royal Australasian College of Surgeons.

  5. Flap reconstruction does not increase complication rates following surgical resection of extremity soft tissue sarcoma.

    PubMed

    Slump, Jelena; Hofer, Stefan O P; Ferguson, Peter C; Wunder, Jay S; Griffin, Anthony M; Hoekstra, Harald J; Bastiaannet, Esther; O'Neill, Anne C

    2018-02-01

    Flap reconstruction plays an essential role in the surgical management of extremity soft tissue sarcoma (ESTS) for many patients. But flaps increase the duration and complexity of the surgery and their contribution to overall morbidity is unclear. This study directly compares the complication rates in patients with ESTS undergoing either flap reconstruction or primary wound closure and explores contributing factors. Eight hundred and ninety-seven patients who underwent ESTS resection followed by primary closure (631) or flap reconstruction (266) were included in this study. Data on patient, tumour and treatment variables and post-operative medical and surgical complications were collected. Univariate and multivariate regression analyses were performed to identify independent predictors of complications. Post-operative complications occurred in 33% of patients. Flap patients were significantly older, had more advanced disease and were more likely to require neoadjuvant chemo- and radiotherapy. There was no significant difference in complication rates following flap reconstruction compared to primary closure on multivariate analysis (38 vs 30.9% OR 1.12, CI 0.77-1.64, p = 0.53). Pre-operative radiation and distal lower extremity tumour location were significant risk factors in patients who underwent primary wound closure but not in those who had flap reconstruction. Patients with comorbidities, increased BMI and systemic disease were at increased risk of complications following flap reconstruction. Flap reconstruction is not associated with increased post-operative complications following ESTS resection. Flaps may mitigate the effects of some risk factors in selected patients. Copyright © 2017. Published by Elsevier Ltd.

  6. Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boehleke, R. F.

    2014-05-06

    This letter serves as the post-closure inspection letter report for Corrective Action Units (CAUs) on the Nevada National Security Site for calendar year 2013. The inspections identified maintenance and repair is required at the following sites: sign and/or fence repair is necessary at CAUs 113, 137, 139, 140, 143, 262, 370, 371, 372, 374, 476, 478, 529, 542, and 560; animal burrows were identified at CAU 547; and erosion was identified at CAUs 366, 367, 383, 551, and 574. In addition, the following use restrictions were removed during 2013 and will no longer be inspected in 2014: 165, 357, andmore » 528.« less

  7. 33 CFR 156.120 - Requirements for transfer.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... closure devices required by §§ 154.520 and 155.805 of this chapter; (g) The transfer system is attached to... hose has no unrepaired loose covers, kinks, bulges, soft spots, or any other defect which would permit....810(g) of this chapter or 46 CFR 39.40-3(c) is fitted between the facility vapor connection and the...

  8. 21 CFR 212.1 - What are the meanings of the technical terms used in these regulations?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... permit the use of a component, container and closure, in-process material, packaging material, or..., and Cosmetic Act, as amended (21 U.S.C. 321 et seq.). Active pharmaceutical ingredient means a... ingredient means any intended component of the PET drug other than the active pharmaceutical ingredient. In...

  9. 75 FR 66804 - Post Office Closing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... POSTAL REGULATORY COMMISSION [Docket No. A2011-1; Order No. 567] Post Office Closing AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: This notice advises the public that the Commission... office closure requirements. See 39 U.S.C. 404(d)(1) and Failure to consider effect on the community. See...

  10. Is adhesive paper-tape closure of video assisted thoracoscopic port-sites safe?

    PubMed

    Luckraz, Heyman; Rammohan, Kandadai S; Phillips, Mabel; O'Keefe, Peter A

    2007-07-01

    Video assisted thoracoscopic surgery (VATS) is used in lung surgery for diagnostic, staging, curative and palliative purposes. The port-sites are usually sutured with dissolvable sutures. The use of adhesive paper-tape for port-site closure was assessed by a prospective randomised double-blind control trial comparing sutured to adhesive paper-tape closure. The following outcomes were assessed: incidence of clinically significant pneumothorax, wound healing using the ASEPSIS score, patient's comfort (pain score using a visual analog score), the time difference between the two techniques of wound closure and cost savings. Thirty patients were recruited in each group. No clinically significant pneumothoraces occurred in either group. There were no significant differences between the two groups in terms of immediate post-operative pain scores, wound cosmesis and wound complications. It was quicker to close the wound with adhesive paper-tape with a mean time of closure per unit length of wound of 9.3 and 2.2s/mm for the groups, respectively. The cost for wound closure (per patient) was $0.8 for the adhesive paper-tape group and $4.00 for the sutures.

  11. Failure analysis of composite laminates including biaxial compression

    NASA Technical Reports Server (NTRS)

    Tennyson, R. C.; Elliott, W. G.

    1983-01-01

    This report describes a continued effort on the development and application of the tensor polynomial failure criterion for composite laminate analysis. In particular, emphasis is given to the design, construction and testing of a cross-beam laminate configuration to obtain "pure' biaxial compression failure. The purpose of this test case was to provide to permit "closure' of the cubic form of the failure surface in the 1-2 compression-compression quadrant. This resulted in a revised set of interaction strength parameters and the construction of a failure surface which can be used with confidence for strength predictions, assuming a plane stress state exists. Furthermore, the problem of complex conjugate roots which can occur in some failure regions is addressed and an "engineering' interpretation is provided. Results are presented illustrating this behavior and the methodology for overcoming this problem is discussed.

  12. Y-12 Industrial Landfill V. Permit application modifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    This report contains the modifications in operations and design to meet the Tennessee Department of Environment and Conversation (TDEC) July 10, 1993, amendments to the regulations for Class 2 landfills. These modifications, though extensive in design and construction cost, are considered minor revisions and should not require a processing fee. Area 1 of ILF V, comprising approximately 20% of the ILF V footprint, was designed and submitted to TDEC prior to the implementation of current regulations. This initial area was constructed with a compacted clay liner and leachate collection system, and became operational in April 1994. The current regulations requiremore » landfills to have a composite liner with leachate collection system and closure cap. Modifications to upgrade Areas 2 and 3 of ILF V to meet the current TDEC requirements are included.« less

  13. 2016 Pesticide General Permit - Pre-publication Version

    EPA Pesticide Factsheets

    EPA has posted a pre-publication version of the 2016 Pesticide General Permit (PGP) to help the regulated community become familiar with the permit requirements before the permit becomes effective on October 31, 2016.

  14. Chest closure without drainage after open patent ductus arteriosus ligation in Ugandan children: A non blinded randomized controlled trial.

    PubMed

    Kebba, Naomi; Mwambu, Tom; Oketcho, Michael; Izudi, Jonathan; Obuku, Ekwaro A

    2016-09-29

    There is clinical equipoise regarding post-operative management of patients with patent ductus arteriosus (PDA) without insertion of a chest drain. This study evaluated post operative outcomes of chest closure with or without a drain following Patent Ductus Arteriosus ligation among childen at Uganda Heart Instritute (UHI). This was an open label randomized controlled trial of 62 children 12 years of age and below diagnosed with patent ductus arteriosus at Mulago National Teaching and Referral Hospital, Uganda. Participants were randomized in the ratio of 1:1 with surgical ligation of patent ductus arteriosus to either thoracotomy closure with a chest tube or without a chest tube. All participants received standard care and were monitored hourly for 24 hours then until hospital discharge. The combined primary endpoint consisted of significant pleural space accumulation of fluid or air, higher oxygen need or infection of the surgical site. Analysis was conducted by multivariable logistic regression analysis at 5 % significance level. We enrolled 62 participants, 46 (74 %) of whom were females. Their median age was 12 months (IQR: 8-36). Participants in the no-drain arm significantly had less post-operative complications compared to the drain arm (Unadjusted odds ratio [uOR]: 0.21, 95 % CI: 0.06-0.73, p = 0.015). This "protective effect" remained without statistical significance in the multivariable regression model (Adjusted odds ratio [aOR]: 0.07, 95 % CI: 0.00-2.50, p = 0.144). Children aged below 6 years with patent ductus arterious can safely and effectively have thoracotomy closure without using a drain in uncomplicated surgical ligation of the PDA. Chest drain was associated with post-operative complications. The trial was registered in the Pan African Clinical Trials registry on 1st/July/2012, retrospectively registered. Identifier number PACTR201207000395469 .

  15. Linear stapler closure of the pharynx during total laryngectomy: a 15-year experience (from closed technique to semi-closed technique)

    PubMed Central

    Altissimi, G; Frenguelli, A

    2007-01-01

    Summary Personal experience in performing linear stapler closure of the pharynx during 70 total laryngectomies is reported. Laryngeal staplers (55 and 60 cm) with an angled handle were used, permitting vertical closure with 19 or 20 metal staples in a double row. A closed technique was initially used, but, over the years, this has gradually been replaced by the semi-closed technique to avoid trapping the suprahyoid part of the epiglottis between the jaws of the stapler. The stapler is inserted below the larynx after having separated it from all muscular and neurovascular connections, and after performing a mini-pharyngotomy at the vallecula epiglottica in order to extract the epiglottis, evert it ventrally and suture it to the hyothyroepiglottic space. The jaws of the stapler are closed and the staples are fired while the flaps of the mini-pharyngotomy are raised above the jaws. The scalpel is inserted above the stapler to remove the larynx. When the stapler is opened, the vertical linear suture of the pharynx is evident and can be examined. This procedure takes only a few minutes to perform. It guarantees a long-term stable watertight closure, dramatically reduces contamination of the operating field by pharyngeal secretions, and permits rapid healing time, greatly lowering patient management costs. In the cases presented here, there was a 1.8% rate of pharyngocutaneous fistulae in patients who were not radiated, whereas the rate was 13.1% in pre-radiated patients. In agreement with the international literature, this procedure does not increase the rate of fistulae and, in fact, it seems to reduce it. Moreover, it is particularly indicated for pre-radiated patients. Nevertheless, the Authors recommend reserving this type of procedure to cases in which, based on meticulous pre-operative assessment by means of endoscopy and imaging, the endolaryngeal site of the tumour has been assessed and there is no need for peri-operative exploration of the pharynx or tongue base. PMID:17883187

  16. Surgical impact and speech outcome at 2.5 years after one- or two-stage cleft palate closure.

    PubMed

    Randag, Anna C; Dreise, Marieke M; Ruettermann, Mike

    2014-11-01

    In the ongoing discussion about timing of palate closure, it is said that early closure is favorable for speech development, but can interfere with maxillary growth. On the other hand, beneficial results on both after one-stage palate closure have also been presented. The assumption that one-stage palate closure leads to less surgical impact on the child probably contributed to the choice for this procedure in most cleft centers. However, no previous research has verified this assumption. The aim of the present study is to compare surgical impact and speech outcome at 2.5 years of age between children who underwent either one- or early two-stage palate closure. Patients underwent either one-stage palate closure between 2007 and 2010 at a median age of 10.8 months (group 1, n=24) or early two-stage closure before 2007 at median ages of 10.4 and 18.2 months, respectively (group 2, n=24). Surgical impact was compared between the two groups by means of duration of surgery, length of hospital stay and number of post-operative complications. Speech outcome was compared by means of resonance problems, nasal air emission, articulation and intelligibility, all assessed at a median age of 2.5 years. The one-stage closure group showed significantly shorter duration of surgery and length of hospital stay (p<0.001 and p=0.001, respectively) and significantly better articulation (p=0.029) than the early two-stage closure group. One-stage palate closure is preferable over early two-stage palate closure with regard to surgical impact and speech development. More extensive, prospective studies, in which maxillary growth is taken into account, should be conducted. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  17. Percutaneous closure of secundum type atrial septal defects: More than 5-year follow-up

    PubMed Central

    Snijder, Roel JR; Suttorp, Maarten J; Berg, Jurriën M Ten; Post, Martijn C

    2015-01-01

    AIM: To investigate long-term efficacy of two different devices more than five years after percutaneous atrial septal defect (ASD) closure in adults. METHODS: All patients who underwent percutaneous closure of an ASD in the St. Antonius Hospital, Nieuwegein, The Netherlands, between February 1998 and December 2006 were included. Percutaneous closure took place under general anaesthesia and transesophageal echocardiographic monitoring. Transthoracic echocardiography (TTE) was performed 24 h post-procedure to visualize the device position and to look for residual shunting using color Doppler. All complications were registered. All patients were invited for an outpatient visit and contrast TTE more than 5-years after closure. Efficacy was based on the presence of a residual right-to-left shunt (RLS), graded as minimal, moderate or severe. The presence of a residual left-to-right shunt (LRS) was diagnosed using color Doppler, and was not graded. Descriptive statistics were used for patients’ characteristics. Univariate analysis was used to identify predictors for residual shunting. RESULTS: In total, 104 patients (mean age 45.5 ± 17.1 years) underwent percutaneous ASD closure using an Amplatzer device (ASO) in 76 patients and a Cardioseal/Starflex device (CS/SF) in 28 patients. The mean follow-up was 6.4 ± 3.4 years. Device migration occurred in 4 patients of whom two cases occurred during the index hospitalization (1 ASO, 1 CS/SF). The other 2 cases of device migration occurred during the first 6 mo of follow-up (2 CS/SF). The recurrent thrombo-embolic event rate was similar in both groups: 0.4% per follow-up year. More than 12 mo post-ASD closure and latest follow-up, new-onset supraventricular tachyarrhythmia’s occurred in 3.9% and 0% for the ASO and CS/SF group, respectively. The RLS rate at latest follow-up was 17.4% (minimal 10.9%, moderate 2.2%, severe 4.3%) and 45.5% (minimal 27.3%, moderate 18.2%, severe 0%) for the ASO- and CS/SF groups, respectively. There was no residual LRS in both groups. CONCLUSION: Percutaneous ASD closure has good long-term safety and efficacy profiles. The residual RLS rate seems to be high more than 5 years after closure, especially in the CS/SF. Residual LRS was not observed. PMID:25810815

  18. Multiple Re-entry Closures After TEVAR for Ruptured Chronic Post-dissection Thoraco-abdominal Aortic Aneurysm.

    PubMed

    Kinoshita, R; Ganaha, F; Ito, J; Ohyama, N; Abe, N; Yamazato, T; Munakata, H; Mabuni, K; Kugai, T

    2018-01-01

    Although thoracic endovascular aortic repair (TEVAR) has become a promising treatment for complicated acute type B dissection, its role in treating chronic post-dissection thoraco-abdominal aortic aneurysm (TAA) is still limited owing to persistent retrograde flow into the false lumen (FL) through abdominal or iliac re-entry tears. A case of chronic post-dissection TAA treatment, in which a dilated descending FL ruptured into the left thorax, is described. The primary entry tear was closed by emergency TEVAR and multiple abdominal re-entries were closed by EVAR. In addition, major re-entries at the detached right renal artery and iliac bifurcation were closed using covered stents. To close re-entries as far as possible, EVAR was carried out using the chimney technique, and additional aortic extenders were placed above the coeliac artery. A few re-entries remained, but complete FL thrombosis of the rupture site was achieved. Follow-up computed tomography showed significant shrinkage of the FL. In treating post-dissection TAA, entry closure by TEVAR is sometimes insufficient, owing to persistent retrograde flow into the FL from abdominal or iliac re-entries. Adjunctive techniques are needed to close these distal re-entries to obtain complete FL exclusion, especially in rupture cases. Recently, encouraging results of complete coverage of the thoraco-abdominal aorta with fenestrated or branched endografts have been reported; however, the widespread employment of such techniques appears to be limited owing to technical difficulties. The present method with multiple re-entry closures using off the shelf and immediately available devices is an alternative for the endovascular treatment of post-dissection TAA, especially in the emergency setting.

  19. Over-the-scope clip placement for closure of gastrointestinal fistula, postoperative leaks and refractory gastrointestinal bleed.

    PubMed

    Nasa, Mukesh; Sharma, Zubin Dev; Choudhary, Narendra S; Patil, Gaurav; Puri, Rajesh; Sud, Randhir

    2016-09-01

    The over-the-scope clip (OTSC) has been successfully used in the closure of fistula, perforation, dehiscence, and endoscopic hemostasis. We describe our experience with the OTSC application. Between April 2014 and April 2015, seven patients underwent OTSC application. In four patients, OTSC was applied for the closure of esophageal fistula, one had OTSC closure of persistent gastrocutaneous fistula after percutaneous endoscopic gastrostomy removal, and OTSC was applied in duodenum in two patients, for duodenal Dieulafoy's lesion after failed conventional endotherapy and massive rebleed in one and duodenal perforation in another. All procedures had technical success with no immediate complication related to OTSC application. Patients were followed up for every month with mean duration of follow up 10.2 months. One patient with bronchoesophageal fistula had development of another fistulous opening above the site of OTSC placement, which was successfully closed with another OTSC. One patient had superficial esophageal wall ulcer opposite the OTSC but it healed spontaneously. OTSC provided safe and successful closure in a number of settings.

  20. An Optimal Frequency in Ca2+ Oscillations for Stomatal Closure Is an Emergent Property of Ion Transport in Guard Cells.

    PubMed

    Minguet-Parramona, Carla; Wang, Yizhou; Hills, Adrian; Vialet-Chabrand, Silvere; Griffiths, Howard; Rogers, Simon; Lawson, Tracy; Lew, Virgilio L; Blatt, Michael R

    2016-01-01

    Oscillations in cytosolic-free Ca(2+) concentration ([Ca(2+)]i) have been proposed to encode information that controls stomatal closure. [Ca(2+)]i oscillations with a period near 10 min were previously shown to be optimal for stomatal closure in Arabidopsis (Arabidopsis thaliana), but the studies offered no insight into their origins or mechanisms of encoding to validate a role in signaling. We have used a proven systems modeling platform to investigate these [Ca(2+)]i oscillations and analyze their origins in guard cell homeostasis and membrane transport. The model faithfully reproduced differences in stomatal closure as a function of oscillation frequency with an optimum period near 10 min under standard conditions. Analysis showed that this optimum was one of a range of frequencies that accelerated closure, each arising from a balance of transport and the prevailing ion gradients across the plasma membrane and tonoplast. These interactions emerge from the experimentally derived kinetics encoded in the model for each of the relevant transporters, without the need of any additional signaling component. The resulting frequencies are of sufficient duration to permit substantial changes in [Ca(2+)]i and, with the accompanying oscillations in voltage, drive the K(+) and anion efflux for stomatal closure. Thus, the frequency optima arise from emergent interactions of transport across the membrane system of the guard cell. Rather than encoding information for ion flux, these oscillations are a by-product of the transport activities that determine stomatal aperture. © 2016 American Society of Plant Biologists. All Rights Reserved.

  1. An Optimal Frequency in Ca2+ Oscillations for Stomatal Closure Is an Emergent Property of Ion Transport in Guard Cells1[CC-BY

    PubMed Central

    Minguet-Parramona, Carla; Hills, Adrian; Vialet-Chabrand, Silvere; Griffiths, Howard; Lawson, Tracy; Lew, Virgilio L.; Blatt, Michael R.

    2016-01-01

    Oscillations in cytosolic-free Ca2+ concentration ([Ca2+]i) have been proposed to encode information that controls stomatal closure. [Ca2+]i oscillations with a period near 10 min were previously shown to be optimal for stomatal closure in Arabidopsis (Arabidopsis thaliana), but the studies offered no insight into their origins or mechanisms of encoding to validate a role in signaling. We have used a proven systems modeling platform to investigate these [Ca2+]i oscillations and analyze their origins in guard cell homeostasis and membrane transport. The model faithfully reproduced differences in stomatal closure as a function of oscillation frequency with an optimum period near 10 min under standard conditions. Analysis showed that this optimum was one of a range of frequencies that accelerated closure, each arising from a balance of transport and the prevailing ion gradients across the plasma membrane and tonoplast. These interactions emerge from the experimentally derived kinetics encoded in the model for each of the relevant transporters, without the need of any additional signaling component. The resulting frequencies are of sufficient duration to permit substantial changes in [Ca2+]i and, with the accompanying oscillations in voltage, drive the K+ and anion efflux for stomatal closure. Thus, the frequency optima arise from emergent interactions of transport across the membrane system of the guard cell. Rather than encoding information for ion flux, these oscillations are a by-product of the transport activities that determine stomatal aperture. PMID:26628748

  2. Conference Support - Surgery in Extreme Environments - Center for Surgical Innovation

    DTIC Science & Technology

    2007-01-01

    flights. During this 16-day mission in April 1998, surgical procedures, including thoracotomies, laparotomies, craniotomies , laminectomies, and...fixation, craniotomy , laminectomy, and leg dissection. These experiments also permitted the evaluation of IV insertion using the autonomic protocol and...missions will be required to address: Repair of lacerations; wound cement, layered closure Incision and drainage of abscess Needle aspiration of

  3. MATERIALS SUPPORTING THE NEW RECREATIONAL ...

    EPA Pesticide Factsheets

    EPA is developing new, rapid methods for monitoring water quality at beaches to determine adequacy of water quality for swimming. The methods being developed rely upon quantitive polymerase chain reaction technology. They will permit real time decisions regarding beach closures. The methods are supported by a series of epidemiology studies evaluating the rate of GI illness resulting from swimming events. Implementation of BEACH Act amendments

  4. Bubblers Speed Nuclear Waste Processing at SRS

    ScienceCinema

    None

    2018-05-23

    At the Department of Energy's Savannah River Site, American Recovery and Reinvestment Act funding has supported installation of bubbler technology and related enhancements in the Defense Waste Processing Facility (DWPF). The improvements will accelerate the processing of radioactive waste into a safe, stable form for storage and permit expedited closure of underground waste tanks holding 37 million gallons of liquid nuclear waste.

  5. 50 CFR 660.230 - Fixed gear fishery-management measures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... permitted for that week. The trip limit for black rockfish caught with hook-and-line gear also applies, see... (e.g. fishing for “other flatfish” using no more than 12 hooks, “Number 2” or smaller), may not... gear is prohibited within the Point St. George YRCA, on dates when the closure is in effect. It is...

  6. 50 CFR 660.230 - Fixed gear fishery-management measures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... permitted for that week. The trip limit for black rockfish caught with hook-and-line gear also applies, see... (e.g. fishing for “other flatfish” using no more than 12 hooks, “Number 2” or smaller), may not... gear is prohibited within the Point St. George YRCA, on dates when the closure is in effect. It is...

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thompson, B.G.J.; Grindrod, P.

    Her Majesty`s Inspectorate of Polution (HMIP) of the United Kingdom has developed a procedure for the post closure assessment of the underground disposal of radioactive waste. In this paper the method of using theory and ideas from the mathematical sciences for assessment is described. The system simulation methodology seeks to discover key combinations of processes or effects which may yield behaviour of interest by sampling across functional and parametric uncertainties, and treating the systems within a probabilistic framework. This paper also discusses how HMIP assessment methodology has been presented, independent of any current application, for review by leading scientists whomore » are independent of the performance assessment field.« less

  8. 47 CFR 63.65 - Closure of public toll station where another toll station of applicant in the community will...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 3 2014-10-01 2014-10-01 false Closure of public toll station where another toll station of applicant in the community will continue service. 63.65 Section 63.65 Telecommunication... of public toll station where another toll station of applicant in the community will continue service...

  9. 47 CFR 63.65 - Closure of public toll station where another toll station of applicant in the community will...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Closure of public toll station where another toll station of applicant in the community will continue service. 63.65 Section 63.65 Telecommunication... of public toll station where another toll station of applicant in the community will continue service...

  10. 47 CFR 63.65 - Closure of public toll station where another toll station of applicant in the community will...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 3 2012-10-01 2012-10-01 false Closure of public toll station where another toll station of applicant in the community will continue service. 63.65 Section 63.65 Telecommunication... of public toll station where another toll station of applicant in the community will continue service...

  11. 47 CFR 63.65 - Closure of public toll station where another toll station of applicant in the community will...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 3 2013-10-01 2013-10-01 false Closure of public toll station where another toll station of applicant in the community will continue service. 63.65 Section 63.65 Telecommunication... of public toll station where another toll station of applicant in the community will continue service...

  12. 47 CFR 63.65 - Closure of public toll station where another toll station of applicant in the community will...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Closure of public toll station where another toll station of applicant in the community will continue service. 63.65 Section 63.65 Telecommunication... of public toll station where another toll station of applicant in the community will continue service...

  13. Full road closure for work zone operations, a cross-cutting study : reducing congestion and crashes through full road closure for maintenance and construction.

    DOT National Transportation Integrated Search

    2003-08-01

    The objective of this report is to raise awareness among designers construction engineers, and managers of the applications and benefits of full road closure during rehabilitation and construction activities. Based on interviews with project personne...

  14. Transient left ventricular systolic dysfunction following surgical closure of large patent ductus arteriosus among children and adolescents operated at the cardiac centre, Ethiopia

    PubMed Central

    2013-01-01

    Background Patent ductus arteriosus (PDA) is one of the commonest congenital heart diseases that require closure within the first few months after birth. The residential area of patients affects the size of the PDA: living in highlands, like most places in Ethiopia, is a risk for having larger sized PDA. Closure of these congenital heart defects is usually performed at an early age in places where capable centers are available. In Ethiopia, closure of these defects is done on mission basis often at an older age. Recently, limited reports came about the occurrence of postoperative left ventricular systolic dysfunction (POLVD) following closure of PDA though full explanation is still lacking. Objective To determine the rate of and time to improvement of POLVD and the factors associated with it in children and adolescents who underwent surgical closure of PDA. Method All children and adolescents who underwent surgical closure of PDA at the Cardiac Center, Ethiopia (CCE) had postoperative follow up with echocardiography. Serial left ventricular ejection fraction (LVEF) and fiber shortening (FS) values were recorded for all of them. SPSS 20 was used to analyze the data. Results A total of 36 children and adolescents who underwent surgical closure of PDA from January 2009 to December 2012 and who fulfilled the inclusion criteria were studied. Their mean age at intervention was 8.52 years (SD = 5.23 years), 77.80% were females. The mean duct size as determined by either echocardiography or intra-operative by the surgeon was 10.31 mm (SD = 3.20 mm). They were followed for a mean duration of 24.80 months (SD = 12.36 months) following surgical closure of PDA. The mean LVEF and FS decreased from 65.06% and 35.28% preoperatively to 54.83% and 28.40% post-operatively respectively. Fifteen (42.86%) of the patients had a post-operative LVEF of less than 55%. The mean time to normalization of systolic function was 5.11 weeks (SD = 3.30 weeks). Having an associated cardiac lesion was an independent predictor of POLVD. Conclusions We conclude that there is a high rate of POLVD following surgical closure of large PDA in highlanders. We recommend a serial and systematic follow up of these children postoperatively. Those with a significant cardiac dysfunction may need cardiac medications like Angiotensin Converting Enzyme Inhibitors (ACEI). PMID:23721219

  15. Hypernetted-chain-like closure of Ornstein-Zernike equation in multibody dissipative particle dynamics

    NASA Astrophysics Data System (ADS)

    Mo, Chao-jie; Qin, Li-zi; Yang, Li-jun

    2017-10-01

    We have derived a hypernetted-chain-like (HNC-like) approximate closure of the Ornstein-Zernike equation for multibody dissipative particle dynamics (MDPD) system in which the classic closures are not directly practicable. We first point out that the Percus's method is applicable to MDPD system in which particles interact with a density-dependent potential. And then an HNC-like closure is derived using Percus's idea and the saddle-point approximation of particle free energy. This HNC-like closure is compared with results of previous researchers, and in many cases, it demonstrates better agreement with computer simulation results. The HNC-like closure is used to predict the cluster crystallization in MDPD. We determine whether the cluster crystallization will happen in a system utilizing the widely applicable Hansen-Verlet freezing criterion and by observing the radial distribution function. The conclusions drawn from the results of the HNC-like closure are in agreement with computer simulation results. We evaluate different weight functions to determine whether they are prone to cluster crystallization. A new effective density-dependent pairwise potential is also proposed to help to explain the tendency to cluster crystallization of MDPD systems.

  16. 10 CFR 61.27 - Application for renewal or closure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...

  17. 10 CFR 61.27 - Application for renewal or closure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...

  18. 10 CFR 61.27 - Application for renewal or closure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...

  19. 10 CFR 61.27 - Application for renewal or closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...

  20. 10 CFR 61.27 - Application for renewal or closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.27 Application for renewal or closure. (a) Any expiration date on a license applies only to the above ground activities and to the authority to dispose of waste. Failure to renew the...

  1. Post-depositional behaviour of mercury and arsenic in submarine mine tailings deposited in Buyat Bay, North Sulawesi, Indonesia.

    PubMed

    Shepherd, Thomas; Rumengan, Inneke; Sahami, Ali

    2018-06-01

    The post-depositional geochemical behaviour of mercury and arsenic in submarine mine tailings from the Mesel Gold Mine in Buyat Bay, North Sulawesi, Indonesia was assessed by in situ sampling of tailings porewaters using dialysis arrays and seawater and fish monitoring. Under steady-state conditions one year after cessation of tailings discharge, the calculated arsenic efflux incrementally added 0.8 μg/L of arsenic to the overlying seawater. The mercury efflux across the tailings-seawater interface was negligible. The arsenic and mercury concentration in seawater bottom samples monitored biannually during a 9-year post-closure program were 1.54 μg/L and <0.05 μg/L, respectively. Analysis of 650 fish tissue samples, from the post-closure monitoring had mean mercury and arsenic concentrations consistently below the FAO/WHO CODEX, and Australian and New Zealand National Food Standards, respectively. The results of the porewater, seawater and fish tissue demonstrate that the arsenic and mercury-bearing bearing compounds in the tailings are geochemically stable. Copyright © 2018 Elsevier Ltd. All rights reserved.

  2. Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2013 and FY2014 (revised)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mizell, Steve A.; Miller, Julianne J.; McCurdy, Greg D.

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Contamination Area (CA) as a result of storm runoff, which supports National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the Soils Corrective Action Unit (CAU) contamination areas. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the appropriate closure designmore » and post-closure monitoring program.« less

  3. Post-Closure Inspection and Monitoring Report for Corrective Action Unit 110: Area 3 WMD U-3ax/bl Crater, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2006-08-01

    This Post-Closure Inspection and Monitoring Report (PCIMR) provides the results of inspections and monitoring for Corrective Action Unit (CAU) 110, Area 3 WMD [Waste Management Division] U-3ax/bl Crater. This PCIMR includes an analysis and summary of the site inspections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at CAU 110, for the annual period July 2005 through June 2006. Site inspections of the cover were performed quarterly to identify any significant changes to the site requiring action. The overall condition of the cover, cover vegetation, perimeter fence, and UR warning signs was good. Settling was observed thatmore » exceeded the action level as specified in Section VILB.7 of the Hazardous Waste Permit Number NEV HW009 (Nevada Division of Environmental Protection, 2000). This permit states that cracks or settling greater than 15 centimeters (6 inches) deep that extend 1.0 meter (m) (3 feet [ft]) or more on the cover will be evaluated and repaired within 60 days of detection. Along the east edge of the cover (repaired previously in August 2003, December 2003, May 2004, October 2004), an area of settling was observed during the December 2005 inspection to again be above the action level, and required repair. This area and two other areas of settling on the cover that were first observed during the December 2005 inspection were repaired in February 2006. The semiannual subsidence surveys were done in September 2005 and March 2006. No significant subsidence was observed in the survey data. Monument 5 shows the greatest amount of subsidence (-0.015 m [-0.05 ft] compared to the baseline survey of 2000). This amount is negligible and near the resolution of the survey instruments; it does not indicate that subsidence is occurring on the cover. Soil moisture results obtained to date indicate that the CAU 110 cover is performing as expected. Time Domain Reflectometry (TDR) data indicated an increase in soil moisture (1 to 3% VMC change) at a depth of 1.8 m (6 ft.) due to the exceptionally heavy precipitation from the January and February 2005 precipitation events. The moisture profile returned to baseline conditions by October 2005. At 2.4 m (8 ft) below the cover surface, TDR data show soil moisture content remained between 10 and 13 percent VMC. Considering the heavy precipitation experience in this and the previous reporting period, a compliance level will be established when the system reaches a steady state and equilibrium has been established.« less

  4. Does the use of an acellular dermal graft in abdominal closure after rectus flap harvest impact the occurrence of post-operative hernia?

    PubMed

    Saman, Masoud; Kadakia, Sameep; Ducic, Yadranko

    2015-12-01

    Patients with rectus free flap harvest extending below the arcuate line are predisposed to postoperative hernia formation. As such, many authors have advocated the use of closure adjuncts to increase the integrity of the closure and prevent hernia or abdominal wall bulging. Busy level 1 public trauma center in metropolitan Fort Worth, Texas Following harvest of the rectus free flap, 48 patients underwent primary closure; 24 of these patients had defects extending below the arcuate line. Forty patients were closed with an acellular dermal graft; 22 of these patients had defects extending below the arcuate line. Postoperative hernia formation and local infection rate were examined in a minimum follow-up period of 1 year. Regardless of closure method, no hernias were observed in the postoperative period. Using an unpaired t test and an alpha value of 0.05, there was no statistically significant difference in the infection rate between the two groups. Following rectus abdominis myocutaneous free flap harvest, the use of an acellular dermal graft in abdominal wall closure may not be of any further advantage in the prevention of hernia. Retrospective (Level III).

  5. Sampling and monitoring for closure

    USGS Publications Warehouse

    McLemore, V.T.; Russell, C.C.; Smith, K.S.

    2004-01-01

    The Metals Mining Sector of the Acid Drainage Technology Initiative (ADTI-MMS) addresses technical drainage-quality issues related to metal mining and related metallurgical operations, for future and active mines, as well as, for historical mines and mining districts. One of the first projects of ADTI-MMS is to develop a handbook describing the best sampling, monitoring, predicting, mitigating, and modeling of drainage from metal mines, pit lakes and related metallurgical facilities based upon current scientific and engineering practices. One of the important aspects of planning a new mine in today's regulatory environment is the philosophy of designing a new or existing mine or expansion of operations for ultimate closure. The holistic philosophy taken in the ADTI-MMS handbook maintains that sampling and monitoring programs should be designed to take into account all aspects of the mine-life cycle. Data required for the closure of the operation are obtained throughout the mine-life cycle, from exploration through post-closure.

  6. [Comparative description and retrospective analisis of modern methods of surgical wounds closure for intraoperative prophylaxis of development of pathologic cutaneous cicatrices].

    PubMed

    Stavyts'kyĭ, S O; Avetikov, D S; Lokes, K P; Rozkolupa, O O; Boĭko, I V

    2014-05-01

    The experience of application of various methods of closure was presented for the head and neck cutaneous wound surfaces after elective operative interventions. The variant of the postoperative results estimation and optimization of the wounds healing by primary closure was proposed.

  7. Solidifying Segregation or Promoting Diversity? School Closure and Rezoning in an Urban District

    ERIC Educational Resources Information Center

    Siegel-Hawley, Genevieve; Bridges, Kimberly; Shields, Thomas J.

    2017-01-01

    Purpose: Layered with myriad considerations, school closure and rezoning processes in urban school systems are politically fraught with the potential for damaging consequences. This article explores the politics and impacts of a closure and rezoning process in Richmond, Virginia, through the lens of themes applicable to urban school systems and…

  8. Risk factors for wound disruption following cesarean delivery.

    PubMed

    Subramaniam, Akila; Jauk, Victoria C; Figueroa, Dana; Biggio, Joseph R; Owen, John; Tita, Alan T N

    2014-08-01

    Risk factors for post-cesarean wound infection, but not disruption, are well-described in the literature. The primary objective of this study was to identify risk factors for non-infectious post-cesarean wound disruption. Secondary analysis was conducted using data from a single-center randomized controlled trial of staple versus suture skin closure in women ≥24 weeks' gestation undergoing cesarean delivery. Wound disruption was defined as subcutaneous skin or fascial dehiscence excluding primary wound infections. Composite wound morbidity (disruption or infection) was examined as a secondary outcome. Patient demographics, medical co-morbidities, and intrapartum characteristics were evaluated as potential risk factors using multivariable logistic regression. Of the 398 randomized patients, 340, including 26 with disruptions (7.6%) met inclusion criteria and were analyzed. After multivariable adjustments, African-American race (aOR 3.9, 95% CI 1.1-13.8) and staple - as opposed to suture - wound closure (aOR 5.4, 95% CI 1.8-16.1) remained significant risk factors for disruption; non-significant increases were observed for body mass index ≥30 (aOR 2.1, 95% CI 0.6-7.5), but not for diabetes mellitus (aOR 0.9, 95% CI 0.3-2.9). RESULTS for composite wound morbidity were similar. Skin closure with staples, African-American race, and considering the relatively small sample size, potentially obesity are associated with increased risk of non-infectious post-cesarean wound disruption.

  9. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  10. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  11. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  12. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  13. 40 CFR 223.1 - Contents of special, emergency, general, and research permits; posting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CONTENTS OF PERMITS; REVISION, REVOCATION OR LIMITATION OF OCEAN DUMPING PERMITS UNDER SECTION 104(d) OF THE ACT Contents of Ocean Dumping Permits Issued... the assessment of the impact of permitted dumping activities on the marine environment at the disposal...

  14. 45 CFR 671.6 - Applications for permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Applications for permits. 671.6 Section 671.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.6 Applications for permits. (a) General content of permit applications. Each application for a permit shall be dated and signed...

  15. 45 CFR 671.6 - Applications for permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Applications for permits. 671.6 Section 671.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.6 Applications for permits. (a) General content of permit applications. Each application for a permit shall be dated and signed...

  16. 45 CFR 671.6 - Applications for permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Applications for permits. 671.6 Section 671.6 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION WASTE REGULATION Permits § 671.6 Applications for permits. (a) General content of permit applications. Each application for a permit shall be dated and signed...

  17. Spontaneous eyelid closures link vigilance fluctuation with fMRI dynamic connectivity states

    PubMed Central

    Wang, Chenhao; Ong, Ju Lynn; Patanaik, Amiya; Chee, Michael W. L.

    2016-01-01

    Fluctuations in resting-state functional connectivity occur but their behavioral significance remains unclear, largely because correlating behavioral state with dynamic functional connectivity states (DCS) engages probes that disrupt the very behavioral state we seek to observe. Observing spontaneous eyelid closures following sleep deprivation permits nonintrusive arousal monitoring. During periods of low arousal dominated by eyelid closures, sliding-window correlation analysis uncovered a DCS associated with reduced within-network functional connectivity of default mode and dorsal/ventral attention networks, as well as reduced anticorrelation between these networks. Conversely, during periods when participants’ eyelids were wide open, a second DCS was associated with less decoupling between the visual network and higher-order cognitive networks that included dorsal/ventral attention and default mode networks. In subcortical structures, eyelid closures were associated with increased connectivity between the striatum and thalamus with the ventral attention network, and greater anticorrelation with the dorsal attention network. When applied to task-based fMRI data, these two DCS predicted interindividual differences in frequency of behavioral lapsing and intraindividual temporal fluctuations in response speed. These findings with participants who underwent a night of total sleep deprivation were replicated in an independent dataset involving partially sleep-deprived participants. Fluctuations in functional connectivity thus appear to be clearly associated with changes in arousal. PMID:27512040

  18. EVALUATION OF MASS FLUX TO AND FROM GROUND WATER USING A VERTICAL FLUX MODEL (VFLUX): APPLICATION TO THE SOIL VACUUM EXTRACTION CLOSURE PROBLEM

    EPA Science Inventory

    Site closure for soil vacuum extraction (SVE) application typically requires attainment of specified soil concentration standards based on the premise that mass flux from the vadose zone to ground water not result in levels exceeding maximum contaminant levels (MCLSs). Unfortuna...

  19. 40 CFR Appendix A to Part 55 - Listing of State and Local Requirements Incorporated by Reference Into Part 55, by State

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (Adopted 12/07/90) Rule 1125Metal Container, Closure, and Coil Coating Operations (Adopted 01/13/95) Rule 1129Aerosol Coatings (Adopted 03/08/96) Rule 1132Further Control of VOC Emissions From High-Emitting Spray.../1997) Section 8.0: Availability of Permit/Registration (Effective 06/01/1997) Section 9.0: Registration...

  20. Helicopter Air-to-Air Combat Test 4 (AACT 4) Maneuverability Analysis

    DTIC Science & Technology

    1992-07-01

    histories during fuselage tail boom skin fatigue dam age ............................................................. 145 x LIST OF FIGURES (Continued...concerning X -Y-Z relative aircraft positions, velocities, headings, relative bearings, slant ranges (distance between aircraft), and closure rates. This...real-time hit feedback system such as a flashing aiming reticle would permit the pilot to assess the actual effort required to put hits on target

  1. 40 CFR 265.14 - Security.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must be written in English and in any other language predominant in the area surrounding the facility...) for discussion of security requirements at disposal facilities during the post-closure care period...

  2. 40 CFR 264.14 - Security.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must be written in English and in any other language predominant in the area surrounding the facility...) for discussion of security requirements at disposal facilities during the post-closure care period...

  3. Transapical access closure: the TA PLUG device†

    PubMed Central

    Brinks, Henriette; Nietlispach, Fabian; Göber, Volkhard; Englberger, Lars; Wenaweser, Peter; Meier, Bernhard; Carrel, Thierry; Huber, Christoph

    2013-01-01

    OBJECTIVES Percutaneous closure of the transapical (TA) access site for large-calibre devices is an unsolved issue. We report the first experimental data on the TA PLUG device for true-percutaneous closure following large apical access for transcatheter aortic valve implantation. METHODS The TA PLUG, a self-sealing full-core closure device, was implanted in an acute animal study in six pigs (60.2 ± 0.7 kg). All the pigs received 100 IU/kg of heparin. The targeted activated clotting time was left to normalize spontaneously. After accessing the left ventricular apex with a 39 French introducer, the closure plug device was delivered with a 33 French over-the-wire system under fluoroscopic guidance into the apex. Time to full haemostasis as well as rate of bleeding was recorded. Self-anchoring properties were assessed by haemodynamic push stress under adrenalin challenge. An additional feasibility study was conducted in four pigs (58.4 ± 1.1 kg) with full surgical exposure of the apex, and assessed device anchoring by pull-force measurements with 0.5 Newton (N) increments. All the animals were electively sacrified. Post-mortem analysis of the heart was performed and the renal embolic index assessed. RESULTS Of six apical closure devices, five were correctly inserted and fully deployed at the first attempt. One became blocked in the delivery system and was placed successfully at the second attempt. In all the animals, complete haemostasis was immediate and no leak was recorded during the 5-h observation period. Neither leak nor any device dislodgement was observed under haemodynamic push stress with repeated left ventricular peak pressure of up to 220 mmHg. In the feasibility study assessing pull-stressing, device migration occurred at a force of 3.3 ± 0.5 N corresponding to 247.5 mmHg. Post-mortem analyses confirmed full expansion of all devices at the intended target. No macroscopic damage was identified at the surrounding myocardium. The renal embolic index was zero. CONCLUSIONS True-percutaneous left ventricular apex closure following large access is feasible with the self-sealing TA PLUG. The device allows for immediate haemostasis and a reliable anchoring in the acute animal setting. This is the first report of a true-percutaneous closure for large-calibre transcatheter aortic valve implantation access. PMID:23842759

  4. Closure Report for Corrective Action Unit 426: Cactus Spring Waste Trenches, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dave Madsen

    This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less

  5. 75 FR 28655 - Rexam Closure Systems, Inc. a Subsidiary of Rexam PLC Including On-Site Leased Workers From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ..., Inc. a Subsidiary of Rexam PLC Including On-Site Leased Workers From Addeco Employment Services..., applicable to the workers of Rexam Closure Systems, Inc., a subsidiary of Rexam PLC, Hamlet, North Carolina... Rexam Closure Systems, Inc., a subsidiary of Rexam PLC purchased Owens Illinois Manufacturing. Some...

  6. Examination of swallowing maneuver training and transfer of practiced behaviors to laryngeal vestibule kinematics in functional swallowing of healthy adults

    PubMed Central

    Guedes, Renata; Azola, Alba; Macrae, Phoebe; Sunday, Kirstyn; Mejia, Veerley; Vose, Alicia; Humbert, Ianessa A.

    2017-01-01

    Swallowing maneuvers are routinely trained in dysphagia rehabilitation with the assumption that practiced behaviors transfer to functional swallowing, however transfer is rarely examined in the deglutition literature. The goal of this study was to train the volitional laryngeal vestibule closure (vLVC) maneuver, which is a swallowing maneuver that targets prolonged laryngeal vestibule closure (LVC). In two different training experiments, 69 healthy adults underwent Long-hold (hold vLVC as long as possible) or Short-hold vLVC training (hold vLVC for 2 seconds). Before and after vLVC training, natural swallows (swallowing without a therapeutic technique) were completed. The outcome variables included laryngeal vestibule closure reaction time and the duration of laryngeal vestibule closure. Results indicate that during both Long-hold and Short-hold vLVC trainings, vLVC swallows had faster laryngeal vestibule closure reaction times and longer durations of laryngeal vestibule closure than in pre-training 5ml liquid swallows. However, only faster laryngeal vestibule closure reaction times transferred to post-training 5ml liquid swallows (20–24% faster), but not prolonged durations of laryngeal vestibule closure. Our findings suggest that swallowing maneuver training has the potential to induce transfer of what was practiced to functional swallowing behavior, although not all practiced behaviors may generalize. These findings are significant for bolstering the effectiveness of dysphagia management medical settings and should be tested in individuals with dysphagia. PMID:28322908

  7. Examination of swallowing maneuver training and transfer of practiced behaviors to laryngeal vestibule kinematics in functional swallowing of healthy adults.

    PubMed

    Guedes, Renata; Azola, Alba; Macrae, Phoebe; Sunday, Kirstyn; Mejia, Veerley; Vose, Alicia; Humbert, Ianessa A

    2017-05-15

    Swallowing maneuvers are routinely trained in dysphagia rehabilitation with the assumption that practiced behaviors transfer to functional swallowing, however transfer is rarely examined in the deglutition literature. The goal of this study was to train the volitional laryngeal vestibule closure (vLVC) maneuver, which is a swallowing maneuver that targets prolonged laryngeal vestibule closure (LVC). In two different training experiments, 69 healthy adults underwent Long-hold (hold vLVC as long as possible) or Short-hold vLVC training (hold vLVC for 2s). Before and after vLVC training, natural swallows (swallowing without a therapeutic technique) were completed. The outcome variables included laryngeal vestibule closure reaction time and the duration of laryngeal vestibule closure. Results indicate that during both Long-hold and Short-hold vLVC trainings, vLVC swallows had faster laryngeal vestibule closure reaction times and longer durations of laryngeal vestibule closure than in pre-training 5ml liquid swallows. However, only faster laryngeal vestibule closure reaction times transferred to post-training 5ml liquid swallows (20-24% faster), but not prolonged durations of laryngeal vestibule closure. Our findings suggest that swallowing maneuver training has the potential to induce transfer of what was practiced to functional swallowing behavior, although not all practiced behaviors may generalize. These findings are significant for bolstering the effectiveness of dysphagia management in medical settings and should be tested in individuals with dysphagia. Copyright © 2017 Elsevier Inc. All rights reserved.

  8. Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2008-04-01

    Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less

  9. No patch technique for complete atrioventricular canal repair.

    PubMed

    Aramendi, José Ignacio; Rodriguez, Miguel Angel; Luis, Teresa; Voces, Roberto

    2006-08-01

    We describe our initial experience with a new technique, consisting in direct closure of the ventricular septal defect component of the AV canal, by directly attaching the common bridging leaflets to the crest of the ventricular septum with interrupted sutures. After closure of the cleft, the ostium primum defect was closed with a running suture suturing the border of the septum primum to the newly created AV valve annulus. Three patients were operated upon. There was no mortality. Mean ischemic time was 39 min and mean pump time 77 min. All patients remained in sinus rhythm. At follow-up only trivial or mild mitral regurgitation was observed. This new technique permits the repair of complete AV canal without the need for any patch. It is fast, simple and reproducible.

  10. 43 CFR 3809.431 - When must I modify my plan of operations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... impacts from unanticipated events or conditions or newly discovered circumstances or information... units; (6) Providing for post-closure management; and (7) Eliminating hazards to public safety. ...

  11. 43 CFR 3809.431 - When must I modify my plan of operations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... impacts from unanticipated events or conditions or newly discovered circumstances or information... units; (6) Providing for post-closure management; and (7) Eliminating hazards to public safety. ...

  12. Diclofenac enables unprecedented week-long microneedle-enhanced delivery of a skin impermeable medication in humans

    PubMed Central

    Brogden, Nicole K.; Banks, Stan L.; Crofford, Leslie J.; Stinchcomb, Audra L.

    2013-01-01

    Microneedles applied to the skin create micropores, allowing transdermal drug delivery of skin-impermeable compounds. The first human study with this technique demonstrated delivery of naltrexone (an opioid antagonist) for two to three days. Rapid micropore closure, however, blunts the delivery window. Application of diclofenac (an anti-inflammatory) allows seven days of naltrexone delivery in animals. Purpose the purpose of the current work was to demonstrate delivery of naltrexone for seven days following one microneedle treatment in humans. Methods Human subjects were treated with microneedles, diclofenac (or placebo), and naltrexone. Impedance measurements were used as a surrogate marker to measure micropore formation, and plasma naltrexone concentrations were measured for seven days post-microneedle application. Results Impedance dropped significantly from baseline to post-microneedle treatment, confirming micropore formation. Naltrexone was detected for seven days in Group 1 (diclofenac + naltrexone, n = 6), vs. 72 hours in Group 2 (placebo + naltrexone, n = 2). At study completion, a significant difference in impedance was observed between intact and microneedle-treated skin in Group 1 (confirming the presence of micropores). Conclusion This is the first study demonstrating week-long drug delivery after one microneedle application, which would increase patient compliance and allow delivery of therapies for chronic diseases. PMID:23761054

  13. Direct bonding in diastema closure--high drama, immediate resolution.

    PubMed

    Blitz, N

    1996-07-01

    Aesthetic rehabilitation in complex diastema closure cases is guided by the principles of proportion. The width to length ratio of the centrals must be pleasing. Achievement of this proper balance dictates treatment. It determines the following: 1) the amount of distal proximal reduction; 2) the decision to completely veneer the incisors vs. just adding to the interproximal; 3) the number of teeth to be treated; 4) the placement and location of naturally occurring prominences and concavities to create the illusion of a narrower tooth. The proper accommodation of these four topics will permit the maintenance or restoration of acceptable dimensions in the centrals. If they are made to appear harmonious then the principle of "golden proportion" (1.6:1:0.6) can be achieved among the centrals, laterals and cuspids. Direct bonding in diastema closure cases allow the dentist and the patient complete control in the formation of that smile. This treatment modality is challenging and ultimately rewarding for the patient and the dentist. At times it enables us to restore form and function and to make our patients whole again not just figuratively but literally.

  14. Argon laser peripheral iridoplasty for angle-closure glaucoma in sibilings with weill-marchesani syndrome.

    PubMed

    Ritch, R; Solomon, L D

    1992-01-01

    A patient with Weill-Marchesani syndrome and angle-closure glaucoma had persistent appositional closure after laser iridotomy that was unrelieved by topical application of either miotic or cycloplegic agents. Argon laser peripheral iridoplasty successfully opened the angle. The patient's sister also had Weill-Marchesani syndrome and angle closure unrelieved by laser iridotomy. Angle closure in Weill-Marchesani syndrome and the response to laser iridotomy and treatment with either miotic or cycloplegic agents may be complex and depends on the relative proportion of pupillary block as a mechanism underlying the angle closure, the functional status of the zonular apparatus, and the degree of angle crowding by the peripheral iris in the presence or absence of peripheral anterior synechiae.

  15. Modeling the Interactions Between Multiple Crack Closure Mechanisms at Threshold

    NASA Technical Reports Server (NTRS)

    Newman, John A.; Riddell, William T.; Piascik, Robert S.

    2003-01-01

    A fatigue crack closure model is developed that includes interactions between the three closure mechanisms most likely to occur at threshold; plasticity, roughness, and oxide. This model, herein referred to as the CROP model (for Closure, Roughness, Oxide, and Plasticity), also includes the effects of out-of plane cracking and multi-axial loading. These features make the CROP closure model uniquely suited for, but not limited to, threshold applications. Rough cracks are idealized here as two-dimensional sawtooths, whose geometry induces mixed-mode crack- tip stresses. Continuum mechanics and crack-tip dislocation concepts are combined to relate crack face displacements to crack-tip loads. Geometric criteria are used to determine closure loads from crack-face displacements. Finite element results, used to verify model predictions, provide critical information about the locations where crack closure occurs.

  16. 78 FR 28839 - ECOsponsible, Incorporated; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ..., Incorporated; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 25, 2013, ECOsponsible, Incorporated filed an application... application during the permit term. A preliminary permit does not authorize the permit holder to perform any...

  17. 36 CFR 13.148 - Permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Permit application. 13.148... 1, 1978 § 13.148 Permit application. In order to obtain, renew or extend a permit, a claimant shall submit a written application. In the case of an application to renew or extend a permit issued pursuant...

  18. 36 CFR 13.148 - Permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Permit application. 13.148... 1, 1978 § 13.148 Permit application. In order to obtain, renew or extend a permit, a claimant shall submit a written application. In the case of an application to renew or extend a permit issued pursuant...

  19. 78 FR 2989 - Monroe Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ...; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 2, 2012, Monroe Hydro LLC filed an application for a... permit holder priority to file a license application during the permit term. A preliminary permit does...

  20. 78 FR 15366 - Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-11

    ..., Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 11, 2013, the Archon Energy 1, Inc., filed an application... application during the permit term. A preliminary permit does not authorize the permit holder to perform any...

  1. 78 FR 27962 - Archon Energy 1, Inc. Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ..., Inc. Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 11, 2013, the Archon Energy 1, Inc., filed an application... the permit holder priority to file a license application during the permit term. A preliminary permit...

  2. 78 FR 25263 - Hydrodynamics, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ..., Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2013, Hydrodynamics, Inc. filed an application for a... permit holder priority to file a license application during the permit term. A preliminary permit does...

  3. 30 CFR 906.30 - State-Federal cooperative agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal lands to submit a permit application package or an application for a permit revision or renewal in... documentation is submitted as part of a permit application, a copy of the entire package will be forwarded to the MMS by OSM. The permit application package or application for a permit revision or renewal shall...

  4. 30 CFR 906.30 - State-Federal cooperative agreement.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Federal lands to submit a permit application package or an application for a permit revision or renewal in... documentation is submitted as part of a permit application, a copy of the entire package will be forwarded to the MMS by OSM. The permit application package or application for a permit revision or renewal shall...

  5. 30 CFR 906.30 - State-Federal cooperative agreement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Federal lands to submit a permit application package or an application for a permit revision or renewal in... documentation is submitted as part of a permit application, a copy of the entire package will be forwarded to the MMS by OSM. The permit application package or application for a permit revision or renewal shall...

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shafer, A.L.; Purdy, S.; Tempelis, D.

    The La Paz County Regional Landfill is a 65 hectare (160 acre) municipal waste site located near the western border of Arizona between the cities of Parker and Quartzsite. The site is operated under a public/private partnership between the County of La Paz and Browning-Ferris Industries, Inc. (BFI). The County owns the landfill and infrastructure and BFI is responsible for facility improvements, environmental compliance, and daily operations. Following the initial permitting and construction of the first landfill cell, a value engineering review was conducted on the site design and permit requirements. Based on this review, substantial cost saving opportunities weremore » identified. In order to implement the value engineering ideas, the site permit was modified and a new Solid Waste Facilities Plan was Submitted to the Arizona Department of Environmental Quality. This paper discusses the value engineering modifications that were conducted, the revisions to the permits, and the relative cost savings that were realized. The areas addressed include the liner system design, closure design, disposal capacity, and operations plan. Through the use of alternative liners a cost savings of well over 50 percent (as compared to the original permit) will be realized over the life of the landfill.« less

  7. [Periprocedural and late complications after percutaneous closure of patent foramen ovale: a single centre experience].

    PubMed

    Węglarz, Przemysław; Konarska Kuszewska, Ewa; Spisak Borowska, Katarzyna; Machowski, Jerzy; Drzewiecka-Gerber, Agnieszka; Kuszewski, Piotr; Jackson, Christopher L; Opala, Grzegorz; Trusz Gluza, Maria

    2012-01-01

    Patent foramen ovale (PFO) is a potential risk factor for ischaemic stroke in young individuals. An interventional method of secondary stroke prevention in PFO patients is its percutaneous closure. To assess safety and effectiveness (i.e. lack of residual shunt) of percutaneous PFO closure in patients with history of cryptogenic cerebrovascular event. 149 patients (56 men/93 women), aged 39 ± 12 years, underwent percutaneous PFO closure. The implantation was performed under local anaesthesia, guided by trans-oesophageal echocardiography (TEE) and fluoroscopy. Follow-up trans-thoracic echocardiography (TTE) was performed at 1 month and follow-up TEE at 6-months. In cases of residual shunt, additional TEE was performed after ensuing 6 months. Effective PFO closure (no residual shunt) was achieved in 91.3% patients at 6 months and 95.3% patients at 12 months. In 2 patients transient atrial fibrillation was observed during the procedure. In 2 patients, a puncture site haematoma developed and in 1 patient superficial thrombophlebitis was noted. In 1 patient a small pericardial effusion was observed, which resolved at day 3 post-procedurally, after administration of non-steroidal anti-inflammatory drugs. Percutaneous PFO closure seems to be a safe procedure when performed in a centre with adequate expertise with regard to these procedures.

  8. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  9. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  10. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  11. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  12. 40 CFR 72.32 - Permit application shield and binding effect of permit application.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.32... submits a timely and complete Acid Rain permit application, the owners and operators of the affected... requirement to have an Acid Rain permit under § 72.9(a)(2) and § 72.30(a); provided that any delay in issuing...

  13. Ectomycorrhizal fungal succession coincides with shifts in organic nitrogen availability and canopy closure in post-wildfire jack pine forests

    Treesearch

    Stephen D. LeDuc; Erik A. Lilleskov; Thomas R. Horton; David E. Rothstein

    2013-01-01

    Successional changes in belowground ectomycorrhizal fungal (EMF) communities have been observed with increasing forest stand age; however, mechanisms behind this change remain unclear. It has been hypothesized that declines of inorganic nitrogen (N) and increases of organic N influence changes in EMF taxa over forest development. In a post-wildfire chronosequence of...

  14. 40 CFR 258.61 - Post-closure care requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...

  15. 40 CFR 258.61 - Post-closure care requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...

  16. 40 CFR 258.61 - Post-closure care requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...

  17. 40 CFR 258.61 - Post-closure care requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...

  18. 36 CFR 13.50 - Closure procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... management considerations necessary to ensure that the activity or area is being managed in a manner... available for inspection at the park visitor center. Notice will also be posted near or within the facility...

  19. Laser tissue melding: use of 1.32-μm computerized Nd:YAG laser, results of leak/burst strength studies in microsurgical procedures

    NASA Astrophysics Data System (ADS)

    Anderson, Dallas W.; Hsu, Tung M.; Halpern, Steven J.; Honaker, Arnold

    1993-07-01

    The ProClosureTM System (PCS) consists of a low power 1.32micrometers Nd:YAG laser coupled to a handheld disposable fiber optic device. The system has been designed to perform a wide range of tissue welding applications such as cosmetic skin closure,vascular surgery, and minimally invasive surgical procedures normally performed with sutures and staples. Utilizing a wavelength for tissue fusion that is least distracted by medium in the surgical field coupled with a computerized delivery system allows for a more precise application (+/- 5%) of laser energy to the tissue. The study design involved the micro-surgical anastomosis of twenty Sprague-Dawley rats (vas deferens) and twenty-one Sprague-Dawley rats (femoral arteries). Each rat is its own contralateral control. Laser repair time is approximately one-third that of conventional suturing. Postoperative dissection and burst strength testing was conducted at day 0, 1, 7, and 14. At each postoperative interval, the mean leak/burst strength for laser-assisted closure v. control, was markedly higher. The precise application of energy fluence resulting from ProClosure's computerized system yields an initial strength and a fluid static seal that is superior to conventional suture closure.

  20. 78 FR 26359 - FFP Project 111, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 1, 2013, FFP Project 111, LLC filed an application for a... application during the permit term. A preliminary permit does not authorize the permit holder to perform any...

  1. 78 FR 30917 - FFP Project 116, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 1, 2013, FFP Project 116, LLC filed an application for a... permit, if issued, is to grant the permit holder priority to file a license application during the permit...

  2. 78 FR 35021 - FFP Project 57, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2013, FFP Project 57, LLC filed an application for a... file a license application during the permit term. A preliminary permit does not authorize the permit...

  3. 78 FR 54643 - KC Scoby Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On May 28, 2013, KC Scoby Hydro, LLC, filed an application for a... file a license application during the permit term. A preliminary permit does not authorize the permit...

  4. 78 FR 35020 - FFP Project 55, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2013, FFP Project 55, LLC filed an application for a... license application during the permit term. A preliminary permit does not authorize the permit holder to...

  5. 78 FR 35016 - FFP Project 118, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On February 1, 2013, FFP Project 118, LLC filed an application for a... application during the permit term. A preliminary permit does not authorize the permit holder to perform any...

  6. 78 FR 35021 - FFP Project 119, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2013, FFP Project 119, LLC filed an application for a... application during the permit term. A preliminary permit does not authorize the permit holder to perform any...

  7. 78 FR 30917 - FFP Project 115, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 1, 2013, FFP Project 115, LLC filed an application for a... permit, if issued, is to grant the permit holder priority to file a license application during the permit...

  8. Granulation tissue formation at the bronchial stump is reduced after stapler closure in comparison to suture closure in dogs.

    PubMed

    Izumi, Yotaro; Kawamura, Masafumi; Gika, Masatoshi; Nomori, Hiroaki

    2010-03-01

    The aim of this study was to compare the morphology of the bronchial stump after lobectomy between mechanical stapler closure and manual suture closure. The effect of fibrin glue application on each method of closure was also observed. Right upper lobectomy was performed in beagles (n=31) using staplers (ST group) or sutures (SU group). In a separate experiment, fibrin glue was sprayed onto the stump after each respective method of closure. After one week, the stump region was examined macroscopically, and also by histology. chi(2)-Test and Mann-Whitney test were used for comparative analysis. The incidence of adhesion formation between the surrounding tissues was significantly reduced in the ST group in comparison to the SU group (22 vs. 80%, P=0.04). The thickness of granulation tissue over the stump was significantly reduced in the ST group in comparison to the SU group (0.8+/-0.2 vs. 2.5+/-0.3 mm, P<0.0001). Vessel density in the granulation tissue was also significantly reduced in the ST group in comparison to the SU group (6+/-2 vs. 16+/-2, P=0.003). Fibrin glue application after stapler closure significantly increased the incidence of adhesion formation, granulation tissue thickness, and vessel density in the granulation tissue over the stump.

  9. Calculation of flow about posts and powerhead model. [space shuttle main engine

    NASA Technical Reports Server (NTRS)

    Anderson, P. G.; Farmer, R. C.

    1985-01-01

    A three dimensional analysis of the non-uniform flow around the liquid oxygen (LOX) posts in the Space Shuttle Main Engine (SSME) powerhead was performed to determine possible factors contributing to the failure of the posts. Also performed was three dimensional numerical fluid flow analysis of the high pressure fuel turbopump (HPFTP) exhaust system, consisting of the turnaround duct (TAD), two-duct hot gas manifold (HGM), and the Version B transfer ducts. The analysis was conducted in the following manner: (1) modeling the flow around a single and small clusters (2 to 10) of posts; (2) modeling the velocity field in the cross plane; and (3) modeling the entire flow region with a three dimensional network type model. Shear stress functions which will permit viscous analysis without requiring excessive numbers of computational grid points were developed. These wall functions, laminar and turbulent, have been compared to standard Blasius solutions and are directly applicable to the cylinder in cross flow class of problems to which the LOX post problem belongs.

  10. 30 CFR 774.17 - Transfer, assignment, or sale of permit rights.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Transfer, assignment, or sale of permit rights... SYSTEMS UNDER REGULATORY PROGRAMS REVISION; RENEWAL; TRANSFER, ASSIGNMENT, OR SALE OF PERMIT RIGHTS; POST... § 774.17 Transfer, assignment, or sale of permit rights. (a) General. No transfer, assignment, or sale...

  11. 30 CFR 774.17 - Transfer, assignment, or sale of permit rights.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Transfer, assignment, or sale of permit rights... SYSTEMS UNDER REGULATORY PROGRAMS REVISION; RENEWAL; TRANSFER, ASSIGNMENT, OR SALE OF PERMIT RIGHTS; POST... § 774.17 Transfer, assignment, or sale of permit rights. (a) General. No transfer, assignment, or sale...

  12. 40 CFR 124.41 - Definitions applicable to PSD permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Definitions applicable to PSD permits... PROGRAMS PROCEDURES FOR DECISIONMAKING Specific Procedures Applicable to PSD Permits § 124.41 Definitions applicable to PSD permits. Whenever PSD permits are processed under this part, the following terms shall have...

  13. 40 CFR 124.41 - Definitions applicable to PSD permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Definitions applicable to PSD permits... PROGRAMS PROCEDURES FOR DECISIONMAKING Specific Procedures Applicable to PSD Permits § 124.41 Definitions applicable to PSD permits. Whenever PSD permits are processed under this part, the following terms shall have...

  14. 40 CFR 124.41 - Definitions applicable to PSD permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Definitions applicable to PSD permits... PROGRAMS PROCEDURES FOR DECISIONMAKING Specific Procedures Applicable to PSD Permits § 124.41 Definitions applicable to PSD permits. Whenever PSD permits are processed under this part, the following terms shall have...

  15. 40 CFR 124.41 - Definitions applicable to PSD permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Definitions applicable to PSD permits... PROGRAMS PROCEDURES FOR DECISIONMAKING Specific Procedures Applicable to PSD Permits § 124.41 Definitions applicable to PSD permits. Whenever PSD permits are processed under this part, the following terms shall have...

  16. 40 CFR 124.41 - Definitions applicable to PSD permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Definitions applicable to PSD permits... PROGRAMS PROCEDURES FOR DECISIONMAKING Specific Procedures Applicable to PSD Permits § 124.41 Definitions applicable to PSD permits. Whenever PSD permits are processed under this part, the following terms shall have...

  17. 27 CFR 19.910 - Application for permit required.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Permits § 19.910 Application for permit required. Any person wishing to establish an alcohol fuel plant shall first make application for and obtain an alcohol fuel producer's permit. The application for a... required by 27 CFR 196.45. Alcohol fuel producers' permits are continuing unless automatically terminated...

  18. 40 CFR 72.31 - Information requirements for Acid Rain permit applications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 17 2012-07-01 2012-07-01 false Information requirements for Acid Rain... (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.31 Information requirements for Acid Rain permit applications. A complete Acid Rain permit application shall include the...

  19. 40 CFR 72.31 - Information requirements for Acid Rain permit applications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Information requirements for Acid Rain... (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.31 Information requirements for Acid Rain permit applications. A complete Acid Rain permit application shall include the...

  20. 40 CFR 72.31 - Information requirements for Acid Rain permit applications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Information requirements for Acid Rain... (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.31 Information requirements for Acid Rain permit applications. A complete Acid Rain permit application shall include the...