Sample records for potential technical requirements

  1. Future Spacelift Requirements Study

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This study addresses future space applications and the derived requirements these potential applications will have on future spacelift systems. This NASA sponsored activity is a comprehensive study of potential missions including those of the military, civil, and commercial users. The study objectively evaluated the key architectural requirements for future launch systems. The results of this study are technical, economic, and policy analyses of future spacelift systems. It is intended to assist NASA and DOD decision-makers in planning technical investments and establishing policy for future U.S. spacelift systems.

  2. Energy Technology Training Conference Proceedings (Atlanta, Georgia, October 27-29, 1976).

    ERIC Educational Resources Information Center

    Oak Ridge Associated Universities, TN.

    Conference goals included identifying projected technical manpower needs and skill mix requirements, potential obstacles to developing an adequate technical education base, and stimulating education, industry, and labor cooperation in technical program development and federal interagency coordination and cooperation. Findings of the conference…

  3. Robotic Arm-Assisted Sonography: Review of Technical Developments and Potential Clinical Applications.

    PubMed

    Swerdlow, Daniel R; Cleary, Kevin; Wilson, Emmanuel; Azizi-Koutenaei, Bamshad; Monfaredi, Reza

    2017-04-01

    Ultrasound imaging requires trained personnel. Advances in robotics and data transmission create the possibility of telesonography. This review introduces clinicians to current technical work in and potential applications of this developing capability. Telesonography offers advantages in hazardous or remote environments. Robotically assisted ultrasound can reduce stress injuries in sonographers and has potential utility during robotic surgery and interventional procedures.

  4. Lessons Learned from Highly Implemented Programs of Study

    ERIC Educational Resources Information Center

    Stipanovic, Natalie; Shumer, Rob; Stringfield, Sam

    2012-01-01

    American businesses and industries have long identified shortages in key career and technical areas--some of these areas require two- or four-year college degrees, whereas others simply require industry certifications. Career and technical education (CTE) has the potential to play a central role in filling these gaps. The current Carl D. Perkins…

  5. Total Quality Management (TQM) in Self-Financed Technical Institutions: A Quality Function Deployment (QFD) and Force Field Analysis Approach

    ERIC Educational Resources Information Center

    Thakkar, Jitesh; Deshmukh, S. G.; Shastree, Anil

    2006-01-01

    Purpose: To explore the potential for adoption of TQM in self-financed technical institutions in the light of new demands and challenges posed by customers/students and society. Design/methodology/approach: The paper presents use of quality function deployment (QFD) which prioritizes technical requirements and correlates them with various…

  6. Advanced missions safety. Volume 2: Technical discussion, Part 2: Experiment safety, guidelines

    NASA Technical Reports Server (NTRS)

    Hinton, M. G., Jr.

    1972-01-01

    A technical analysis of a portion of the advanced missions safety study is presented. The potential hazards introduced when experimental equipment is carried aboard the Earth Orbit Shuttle are identified. Safety guidelines and requirements for eliminating or reducing these hazards are recommended.

  7. Greater Buyer Effectiveness through Automation

    DTIC Science & Technology

    1989-01-01

    assignment to the buyer Coordination - automated routing of requirement package to technical, finance, transportation, packaging, small business ... security , data, safety, etc. Consolidation - automated identification of requirements for identical or similar items for potential consolidation

  8. Estimating Renewable Energy Economic Potential in the United States: Methodology and Initial Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Austin; Beiter, Philipp; Heimiller, Donna

    The report describes a geospatial analysis method to estimate the economic potential of several renewable resources available for electricity generation in the United States. Economic potential, one measure of renewable generation potential, is defined in this report as the subset of the available resource technical potential where the cost required to generate the electricity (which determines the minimum revenue requirements for development of the resource) is below the revenue available in terms of displaced energy and displaced capacity.

  9. Monitored Natural Attenuation of Inorganic Contaminants in Ground Water Volume 1 – Technical Basis for Assessment

    EPA Science Inventory

    This document represents the first volume of a set of three volumes that address the technical basis and requirements for assessing the potential applicability of MNA as part of a ground-water remedy for plumes with non-radionuclide and/or radionuclide inorganic contaminants. Vo...

  10. 40 CFR 51.1010 - Requirements for reasonably available control technology (RACT) and reasonably available control...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the list of the potential measures considered by the State, and information and analysis sufficient to.... Potential measures that are reasonably available considering technical and economic feasibility must be...

  11. Rooftop Solar Technical Potential for Low-to-Moderate Income Households in

    Science.gov Websites

    communities. A map of the United States, divided by county, is color-coded by the total solar technical of LMI households in the U.S. (approximately 43 percent), this analysis reveals two other important city governments, though to do so requires deployment on multi-family and renter-occupied buildings

  12. Technology and development requirements for advanced coal conversion systems

    NASA Technical Reports Server (NTRS)

    1981-01-01

    A compendium of coal conversion process descriptions is presented. The SRS and MC data bases were utilized to provide information paticularly in the areas of existing process designs and process evaluations. Additional information requirements were established and arrangements were made to visit process developers, pilot plants, and process development units to obtain information that was not otherwise available. Plant designs, process descriptions and operating conditions, and performance characteristics were analyzed and requirements for further development identified and evaluated to determine the impact of these requirements on the process commercialization potential from the standpoint of economics and technical feasibility. A preliminary methodology was established for the comparative technical and economic assessment of advanced processes.

  13. Pacific Northwest National Laboratory Potential Impact Categories for Radiological Air Emission Monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ballinger, Marcel Y.; Gervais, Todd L.; Barnett, J. Matthew

    2012-06-05

    In 2002, the EPA amended 40 CFR 61 Subpart H and 40 CFR 61 Appendix B Method 114 to include requirements from ANSI/HPS N13.1-1999 Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities for major emission points. Additionally, the WDOH amended the Washington Administrative Code (WAC) 246-247 Radiation protection-air emissions to include ANSI/HPS N13.1-1999 requirements for major and minor emission points when new permitting actions are approved. A result of the amended regulations is the requirement to prepare a written technical basis for the radiological air emission sampling and monitoring program. A keymore » component of the technical basis is the Potential Impact Category (PIC) assigned to an emission point. This paper discusses the PIC assignments for the Pacific Northwest National Laboratory (PNNL) Integrated Laboratory emission units; this revision includes five PIC categories.« less

  14. A PSFI-based analysis on the energy efficiency potential of China’s domestic passenger vehicles

    NASA Astrophysics Data System (ADS)

    Chen, Chuan; Ren, Huanhuan; Zhao, Dongchang

    2017-01-01

    In this article, China’s domestic passenger vehicles (excluding new energy vehicles) are categorized into two groups: local brand vehicles and vehicles manufactured by joint ventures. Performance-Size-Fuel economy Index (PSFI) will be applied to analyse the speed of technical progress and the future trends of these vehicles. In addition, a forecast on energy efficiency potential of domestic passenger vehicles from 2016 to 2020 will be made based on different Emphasis on Reducing Fuel Consumption (ERFC) scenarios. According to the study, if the process of technical progress continues at its current speed, domestic ICE passenger vehicles will hardly meet Phase IV requirements by 2020 even though companies contribute as much technical progress to fuel consumption reduction as possible.

  15. Supersonics Project: Airport Noise Technical Challenge

    NASA Technical Reports Server (NTRS)

    Bridges, James E.

    2008-01-01

    This presentation gives an overview of the work being done under the Airport Noise Technical Challenge portion of the Supersonics Project in the Fundamental Aeronautics Program. The objective of the Challenge is to provide technology (e.g. low noise nozzle concepts) and engineering tools required for a viable supersonic aircraft. To accomplish this we have activities divided into Prediction, Diagnostics, and Engineering elements. Each of the tasks reviewed here have potential applications to work being done at other flight regimes and other aircraft and are of interest to the Acoustics Technical Working Group.

  16. Brownfield to Brightfield Initiative in Oak Ridge, TN - 12346

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hough, Gil; Fairless, Chad

    Experience characterizing, permitting, and restoring 'Brownfield' sites-government or industrial sites with restricted future use due to the presence or potential presence of hazardous substances, pollutants, or contaminants-is being leveraged to identify opportunities for redevelopment into solar power generating facilities which, in this context, are called 'Brightfields'. Brownfield sites offer the expansive land necessary for large photovoltaic (PV) solar farms, but require an in-depth working knowledge of complicated regulatory restrictions and environmental constraints to develop them. As a part of the effort to identify opportunities for redevelopment of Brownfield sites for solar applications, a technical guide, was composed specifically for themore » development of solar generation on restricted use sites. The basis of the technical guide gives specific consideration to environmental requirements and installation methods breaking that into three areas for assessing: 1) levels of contamination, 2) ground penetration requirements, and 3) the requirements for aesthetics and maintenance. Brightfield projects are underway to support the technical guide and expand re-industrialization efforts for the former DOE Gaseous Diffusion Plant in Oak Ridge, TN. There are exciting opportunities to turn Brownfields into Brightfield solar energy solutions for meeting the future renewable energy needs of our country. Brownfields that offer the large surface area required for solar PV farms coupled with the technical guide for the installation of solar farms on restricted use sites supports efforts to develop the solar capacities and expertise to tap this future market. The initial projects designed following the technical guide will provide verification of the installation requirements and beneficial reuse of restricted use sites. (authors)« less

  17. Renewable Energy Technical Potential | Geospatial Data Science | NREL

    Science.gov Websites

    Technical Potential Renewable Energy Technical Potential The renewable energy technical potential level from Resource to Technical to Economic to Market. The benefit of assessing technical potential is potential-resource, technical, economic, and market-as shown in the graphic with key assumptions. Technical

  18. Technical Basis for PNNL Beryllium Inventory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Michelle Lynn

    2014-07-09

    The Department of Energy (DOE) issued Title 10 of the Code of Federal Regulations Part 850, “Chronic Beryllium Disease Prevention Program” (the Beryllium Rule) in 1999 and required full compliance by no later than January 7, 2002. The Beryllium Rule requires the development of a baseline beryllium inventory of the locations of beryllium operations and other locations of potential beryllium contamination at DOE facilities. The baseline beryllium inventory is also required to identify workers exposed or potentially exposed to beryllium at those locations. Prior to DOE issuing 10 CFR 850, Pacific Northwest Nuclear Laboratory (PNNL) had documented the beryllium characterizationmore » and worker exposure potential for multiple facilities in compliance with DOE’s 1997 Notice 440.1, “Interim Chronic Beryllium Disease.” After DOE’s issuance of 10 CFR 850, PNNL developed an implementation plan to be compliant by 2002. In 2014, an internal self-assessment (ITS #E-00748) of PNNL’s Chronic Beryllium Disease Prevention Program (CBDPP) identified several deficiencies. One deficiency is that the technical basis for establishing the baseline beryllium inventory when the Beryllium Rule was implemented was either not documented or not retrievable. In addition, the beryllium inventory itself had not been adequately documented and maintained since PNNL established its own CBDPP, separate from Hanford Site’s program. This document reconstructs PNNL’s baseline beryllium inventory as it would have existed when it achieved compliance with the Beryllium Rule in 2001 and provides the technical basis for the baseline beryllium inventory.« less

  19. Preparing clinical grade Ag-specific T cells for adoptive immunotherapy trials

    PubMed Central

    DiGiusto, DL; Cooper, LJN

    2007-01-01

    The production of clinical-grade T cells for adoptive immunotherapy has evolved from the ex vivo numerical expansion of tumor-infiltrating lymphocytes to sophisticated bioengineering processes often requiring cell selection, genetic modification and other extensive tissue culture manipulations, to produce desired cells with improved therapeutic potential. Advancements in understanding the biology of lymphocyte signaling, activation, homing and sustained in vivo proliferative potential have redefined the strategies used to produce T cells suitable for clinical investigation. When combined with new technical methods in cell processing and culturing, the therapeutic potential of T cells manufactured in academic centers has improved dramatically. Paralleling these technical achievements in cell manufacturing is the development of broadly applied regulatory standards that define the requirements for the clinical implementation of cell products with ever-increasing complexity. In concert with academic facilities operating in compliance with current good manufacturing practice, the prescribing physician can now infuse T cells with a highly selected or endowed phenotype that has been uniformly manufactured according to standard operating procedures and that meets federal guidelines for quality of investigational cell products. In this review we address salient issues related to the technical, immunologic, practical and regulatory aspects of manufacturing these advanced T-cell products for clinical use. PMID:17943498

  20. Report: Review of Hotline Complaint Regarding Technical Assistance Grant No. 1-97025201 Awarded to the Basin Cleanup Coalition, Coeur d’Alene, Idaho

    EPA Pesticide Factsheets

    Report #2004-P-00010, March 25, 2004. The Coalition was not a qualified TAG recipient because of the potential conflicts of interest as defined in 40 CFR 30.42, and did not meet the minimum capability requirements required by the CFR.

  1. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1 Evaluation... technical guidelines of subparts C and D, in accordance with the application requirements set forth in...

  2. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1 Evaluation... technical guidelines of subparts C and D, in accordance with the application requirements set forth in...

  3. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1 Evaluation... technical guidelines of subparts C and D, in accordance with the application requirements set forth in...

  4. 10 CFR 960.3-2-2-1 - Evaluation of all potentially acceptable sites.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...-1 Section 960.3-2-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-1 Evaluation... technical guidelines of subparts C and D, in accordance with the application requirements set forth in...

  5. Airport Surface Control Systems Development Analysis Expanded

    DOT National Transportation Integrated Search

    1990-01-01

    A previous MITRE Technical Report, Airport Surface Traffic Control Systems Deployment Analysis, FAA-RD-74-6, presented an analysis of ASTC (Airport Surface Traffic Control) system requirements and developed estimates of the deployment potential of pr...

  6. Overview of Energy Systems' safety analysis report programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The primary purpose of an Safety Analysis Report (SAR) is to provide a basis for judging the adequacy of a facility's safety. The SAR documents the safety analyses that systematically identify the hazards posed by the facility, analyze the consequences and risk of potential accidents, and describe hazard control measures that protect the health and safety of the public and employees. In addition, some SARs document, as Technical Safety Requirements (TSRs, which include Technical Specifications and Operational Safety Requirements), technical and administrative requirements that ensure the facility is operated within prescribed safety limits. SARs also provide conveniently summarized information thatmore » may be used to support procedure development, training, inspections, and other activities necessary to facility operation. This Overview of Energy Systems Safety Analysis Report Programs'' Provides an introduction to the programs and processes used in the development and maintenance of the SARs. It also summarizes some of the uses of the SARs within Energy Systems and DOE.« less

  7. Overview of Energy Systems` safety analysis report programs. Safety Analysis Report Update Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The primary purpose of an Safety Analysis Report (SAR) is to provide a basis for judging the adequacy of a facility`s safety. The SAR documents the safety analyses that systematically identify the hazards posed by the facility, analyze the consequences and risk of potential accidents, and describe hazard control measures that protect the health and safety of the public and employees. In addition, some SARs document, as Technical Safety Requirements (TSRs, which include Technical Specifications and Operational Safety Requirements), technical and administrative requirements that ensure the facility is operated within prescribed safety limits. SARs also provide conveniently summarized information thatmore » may be used to support procedure development, training, inspections, and other activities necessary to facility operation. This ``Overview of Energy Systems Safety Analysis Report Programs`` Provides an introduction to the programs and processes used in the development and maintenance of the SARs. It also summarizes some of the uses of the SARs within Energy Systems and DOE.« less

  8. Gas Turbine Engine Production Implementation Study : Volume 2. Technical Discussion.

    DOT National Transportation Integrated Search

    1973-07-01

    This report presents a summarization and assessment of available information pertaining to the potential for implementing mass production of gas turbine engine-powered automobiles. The main topic covered is the schedule requirement for that implement...

  9. Evaluation of ERDA-sponsored coal feed system development

    NASA Technical Reports Server (NTRS)

    Phen, R. L.; Luckow, W. K.; Mattson, L.; Otth, D.; Tsou, P.

    1977-01-01

    Coal feeders were evaluated based upon criteria such as technical feasibility, performance (i.e. ability to meet process requirements), projected life cycle costs, and projected development cost. An initial set of feeders was selected based on the feeders' cost savings potential compared with baseline lockhopper systems. Additional feeders were considered for selection based on: (1) increasing the probability of successful feeder development; (2) application to specific processes; and (3) technical merit. A coal feeder development program is outlined.

  10. Task 2 Report - A GIS-Based Technical Potential Assessment of Domestic Energy Resources for Electricity Generation.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Nathan; Grue, Nicholas W; Rosenlieb, Evan

    The purpose of this report is to support the Lao Ministry of Energy and Mines in assessing the technical potential of domestic energy resources for utility scale electricity generation in the Lao PDR. Specifically, this work provides assessments of technical potential, and associated maps of developable areas, for energy technologies of interest. This report details the methodology, assumptions, and datasets employed in this analysis to provide a transparent, replicable process for future analyses. The methodology and results presented are intended to be a fundamental input to subsequent decision making and energy planning-related analyses. This work concentrates on domestic energy resourcesmore » for utility-scale electricity generation and considers solar photovoltaic, wind, biomass, and coal resources. This work does not consider potentially imported energy resources (e.g., natural gas) or domestic energy resources that are not present in sufficient quantity for utility-scale generation (e.g., geothermal resources). A technical potential assessment of hydropower resources is currently not feasible due to the absence of required data including site-level assessments of multiple characteristics (e.g., geology environment and access) as well as spatial data on estimated non-exploited hydropower resources. This report is the second output of the Energy Alternatives Study for the Lao PDR, a collaboration led by the Lao Ministry of Energy and Mines and the United States Agency for International Development under the auspices of the Smart Infrastructure for the Mekong program. The Energy Alternatives Study is composed of five successive tasks that collectively support the project's goals. This work is focused on Task 2 - Assess technical potential of domestic energy resources for electricity generation. The work was carried out by a team from the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) in collaboration with the Lao Ministry of Energy and Mines and other Lao power sector stakeholders. and datasets employed in this analysis to provide a transparent, replicable process for future analyses. The methodology and results presented are intended to be a fundamental input to subsequent decision making and energy planning-related analyses. This work concentrates on domestic energy resources for utility-scale electricity generation and considers solar photovoltaic, wind, biomass, and coal resources. This work does not consider potentially imported energy resources (e.g., natural gas) or domestic energy resources that are not present in sufficient quantity for utility-scale generation (e.g., geothermal resources). A technical potential assessment of hydropower resources is currently not feasible due to the absence of required data including site-level assessments of multiple characteristics (e.g., geology environment and access) as well as spatial data on estimated non-exploited hydropower resources.« less

  11. Survey on multisensory feedback virtual reality dental training systems.

    PubMed

    Wang, D; Li, T; Zhang, Y; Hou, J

    2016-11-01

    Compared with traditional dental training methods, virtual reality training systems integrated with multisensory feedback possess potentials advantages. However, there exist many technical challenges in developing a satisfactory simulator. In this manuscript, we systematically survey several current dental training systems to identify the gaps between the capabilities of these systems and the clinical training requirements. After briefly summarising the components, functions and unique features of each system, we discuss the technical challenges behind these systems including the software, hardware and user evaluation methods. Finally, the clinical requirements of an ideal dental training system are proposed. Future research/development areas are identified based on an analysis of the gaps between current systems and clinical training requirements. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  12. Phase A design study of microgravity fluoride fiber puller

    NASA Technical Reports Server (NTRS)

    Workman, Gary L.; Smith, Guy A.; Kosten, Susan

    1994-01-01

    Improved transmission properties for fluoride fibers due to space processing has great potential for commercial benefits. Phase A design study will determine conceptual feasibility and provide initial definition of the technical requirements and design issues for space.

  13. Nuclear powerplants for mobile applications.

    NASA Technical Reports Server (NTRS)

    Anderson, J. L.

    1972-01-01

    Mobile nuclear powerplants for applications other than large ships and submarines will require compact, lightweight reactors with especially stringent impact-safety design. This paper examines the technical and economic feasibility that the broadening role of civilian nuclear power, in general, (land-based nuclear electric generating plants and nuclear ships) can extend to lightweight, safe mobile nuclear powerplants. The paper discusses technical experience, identifies potential sources of technology for advanced concepts, cites the results of economic studies of mobile nuclear powerplants, and surveys future technical capabilities needed by examining the current use and projected needs for vehicles, machines, and habitats that could effectively use mobile nuclear reactor powerplants.

  14. Nuclear power plants for mobile applications

    NASA Technical Reports Server (NTRS)

    Anderson, J. L.

    1972-01-01

    Mobile nuclear powerplants for applications other than large ships and submarines will require compact, lightweight reactors with especially stringent impact-safety design. The technical and economic feasibility that the broadening role of civilian nuclear power, in general, (land-based nuclear electric generating plants and nuclear ships) can extend to lightweight, safe mobile nuclear powerplants are examined. The paper discusses technical experience, identifies potential sources of technology for advanced concepts, cites the results of economic studies of mobile nuclear powerplants, and surveys future technical capabilities needed by examining the current use and projected needs for vehicles, machines, and habitats that could effectively use mobile nuclear reactor powerplants.

  15. Planetary Protection Technologies: Technical Challenges for Mars Exploration

    NASA Technical Reports Server (NTRS)

    Buxbaum, Karen L.

    2005-01-01

    The search for life in the solar system, using either in situ analysis or sample return, brings with it special technical challenges in the area of planetary protection. Planetary protection (PP) requires planetary explorers to preserve biological and organic conditions for future exploration and to protect the Earth from potential extraterrestrial contamination that could occur as a result of sample return to the Earth-Moon system. In view of the exploration plans before us, the NASA Solar System Exploration Program Roadmap published in May 2003 identified planetary protection as one of 13 technologies for "high priority technology investments." Recent discoveries at Mars and Jupiter, coupled with new policies, have made this planning for planetary protection technology particularly challenging and relevant.New missions to Mars have been formulated, which present significantly greater forward contamination potential. New policies, including the introduction by COSPAR of a Category IVc for planetary protection, have been adopted by COSPAR in response. Some missions may not be feasible without the introduction of new planetary protection technologies. Other missions may be technically possible but planetary protection requirements may be so costly to implement with current technology that they are not affordable. A strategic investment strategy will be needed to focus on technology investments designed to enable future missions and reduce the costs of future missions. This presentation will describe some of the potential technological pathways that may be most protective.

  16. Identifying Potential Weapon Systems That Can Be Divested

    DTIC Science & Technology

    2016-04-08

    List of Figures Figure 1.1 – TACOM LCMC Sustainment Systems Technical Support (SSTS) Operation Maintenance Army (OMA)……………………………………………………………………….6...LCMC Sustainment Systems Technical Support (SSTS) Operation Maintenance Army (OMA) Requirements Tracking System (TORTS) process used to develop...Force operational concepts (Peltz, 2003). The Army’s ability to keep systems operational from a maintenance standpoint is driven by two factors

  17. AdaNET research project

    NASA Technical Reports Server (NTRS)

    Digman, R. Michael

    1988-01-01

    The components necessary for the success of the commercialization of an Ada Technology Transition Network are reported in detail. The organizational plan presents the planned structure for services development and technical transition of AdaNET services to potential user communities. The Business Plan is the operational plan for the AdaNET service as a commercial venture. The Technical Plan is the plan from which the AdaNET can be designed including detailed requirements analysis. Also contained is an analysis of user fees and charges, and a proposed user fee schedule.

  18. Shuttle payload interface verification equipment study. Volume 2: Technical document, part 1

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The technical analysis is reported that was performed during the shuttle payload interface verification equipment study. It describes: (1) the background and intent of the study; (2) study approach and philosophy covering all facets of shuttle payload/cargo integration; (3)shuttle payload integration requirements; (4) preliminary design of the horizontal IVE; (5) vertical IVE concept; and (6) IVE program development plans, schedule and cost. Also included is a payload integration analysis task to identify potential uses in addition to payload interface verification.

  19. Recommendations for the treatment of aging in standard technical specifications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Orton, R.D.; Allen, R.P.

    1995-09-01

    As part of the US Nuclear Regulatory Commission`s Nuclear Plant Aging Research Program, Pacific Northwest Laboratory (PNL) evaluated the standard technical specifications for nuclear power plants to determine whether the current surveillance requirements (SRs) were effective in detecting age-related degradation. Nuclear Plant Aging Research findings for selected systems and components were reviewed to identify the stressors and operative aging mechanisms and to evaluate the methods available to detect, differentiate, and trend the resulting aging degradation. Current surveillance and testing requirements for these systems and components were reviewed for their effectiveness in detecting degraded conditions and for potential contributions to prematuremore » degradation. When the current surveillance and testing requirements appeared ineffective in detecting aging degradation or potentially could contribute to premature degradation, a possible deficiency in the SRs was identified that could result in undetected degradation. Based on this evaluation, PNL developed recommendations for inspection, surveillance, trending, and condition monitoring methods to be incorporated in the SRs to better detect age- related degradation of these selected systems and components.« less

  20. Enforcement Requirements For High-Occupancy Vehicle Facilities, Final Report

    DOT National Transportation Integrated Search

    1995-02-01

    This handbook is designed for technical staff as an instructional guide to the 1990 Census Transportation Planning Package (CTPP) and its potential uses. the CTPP contains 1990 social and economic data by place of residence, place of work, and journe...

  1. Standardization of quantum technologies and QKD activities within ETSI (Conference Presentation)

    NASA Astrophysics Data System (ADS)

    Lenhart, Gaby

    2016-04-01

    In order to establish new ICT technologies successfully on the market it is essential to build trust within any potential users. This is especially true for technologies which are based upon paradigms that are not yet familiar to these users, such as quantum technologies. Technical standards are an excellent means to offer a certain degree of legal reliability and technical interoperability that is required by industry for commercial take up. While such standards on the one hand must be clear enough to provide strict rules for implementers, on the other hand they also must remain flexible enough to not restrict progress in further research and development on the standardized technology. Hence such standards have to be produced by a wide variety of stakeholders taking into account all their different needs. The paper will provide some insight into the general mechanisms of standardization and their relation to quantum technologies. Alongside with the relevance of standardization as an enabler for certification of quantum based technologies it will explain its potential for securing intellectual property. In its first part paper will concentrate on the advantages of standardization and discuss fears some of the stakeholders share, in detail. The second part will focus on the technical work going on in ETSI in relation to quantum technologies. In 2008 ETSI created a standards work group on Quantum Key Distribution, the ETSI ISG QKD and more recently a group on Quantum-Safe Cryptography, the ETSI ISG QSC. A significant part of the technical work of these groups has already been published and will be introduced in the following. However a big share of work is still ongoing and lot more is planned for the future, as are continuous revisions and updates of the published specifications. This standardization work covers several levels: It starts of by problem statements in the form of use cases, from which technical requirements can be derived. These requirements then form the base upon which a reference architecture is created. Various different specifications describe in detail components, protocols and interfaces. An ontology is developed in order to guarantee common understanding of the technical terms used in standardization for quantum technologies. Special emphasis is provided to security proofs.

  2. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  3. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  4. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  5. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  6. 10 CFR 76.87 - Technical safety requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...

  7. Advanced transportation system studies, technical area 3. Alternate propulsion subsystem concepts: J-2S restart study

    NASA Astrophysics Data System (ADS)

    Vilja, John; Levack, Daniel

    1993-04-01

    The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.

  8. 10 CFR 830.205 - Technical safety requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2010-01-01 2010-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...

  9. 10 CFR 830.205 - Technical safety requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2011-01-01 2011-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...

  10. Implementation of Systems Engineering Practices into a Capstone Course

    NASA Technical Reports Server (NTRS)

    Murphy, Gloria; Schmidt, Peter

    2011-01-01

    Discusses the NASA Exploration Systems Mission Directorate senior design projects which are to provide students with senior design project ideas, with potential contribution to NASA ESMD objectives. and provides NASA technical representative to act as external customer / technology mentor / requirements source.

  11. 10 CFR 960.5-2-5 - Environmental quality.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts..., technical, social, economic, and environmental factors; and (2) the requirements specified in § 960.5-1(a)(2... the activities proposed to take place thereon. (2) Potential significant adverse environmental impacts...

  12. 10 CFR 960.5-2-5 - Environmental quality.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts..., technical, social, economic, and environmental factors; and (2) the requirements specified in § 960.5-1(a)(2... the activities proposed to take place thereon. (2) Potential significant adverse environmental impacts...

  13. 10 CFR 960.5-2-5 - Environmental quality.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts..., technical, social, economic, and environmental factors; and (2) the requirements specified in § 960.5-1(a)(2... the activities proposed to take place thereon. (2) Potential significant adverse environmental impacts...

  14. 16 CFR 1500.49 - Technical requirements for determining a sharp metal or glass edge in toys and other articles...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... intended for use by children under 8 years of age. (a) Objective. The sharp edge test method prescribed by... and articles, present a potential risk of injury by laceration or avulsion under section 2(s) of the... articles with edges that are identified as presenting a potential risk of laceration or avulsion injury to...

  15. 16 CFR 1500.49 - Technical requirements for determining a sharp metal or glass edge in toys and other articles...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... intended for use by children under 8 years of age. (a) Objective. The sharp edge test method prescribed by... and articles, present a potential risk of injury by laceration or avulsion under section 2(s) of the... articles with edges that are identified as presenting a potential risk of laceration or avulsion injury to...

  16. 16 CFR 1500.49 - Technical requirements for determining a sharp metal or glass edge in toys and other articles...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... intended for use by children under 8 years of age. (a) Objective. The sharp edge test method prescribed by... and articles, present a potential risk of injury by laceration or avulsion under section 2(s) of the... articles with edges that are identified as presenting a potential risk of laceration or avulsion injury to...

  17. 16 CFR § 1500.49 - Technical requirements for determining a sharp metal or glass edge in toys and other articles...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... articles intended for use by children under 8 years of age. (a) Objective. The sharp edge test method... such toys and articles, present a potential risk of injury by laceration or avulsion under section 2(s... toys and other articles with edges that are identified as presenting a potential risk of laceration or...

  18. 16 CFR 1500.49 - Technical requirements for determining a sharp metal or glass edge in toys and other articles...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... intended for use by children under 8 years of age. (a) Objective. The sharp edge test method prescribed by... and articles, present a potential risk of injury by laceration or avulsion under section 2(s) of the... articles with edges that are identified as presenting a potential risk of laceration or avulsion injury to...

  19. Mentoring disadvantaged nursing students through technical writing workshops.

    PubMed

    Johnson, Molly K; Symes, Lene; Bernard, Lillian; Landson, Margie J; Carroll, Theresa L

    2007-01-01

    Recent studies have identified a problematic gap for nursing students between terse clinical writing and formal academic writing. This gap can create a potential barrier to academic and workplace success, especially for disadvantaged nursing students who have not acquired the disciplinary conventions and sophisticated writing required in upper-level nursing courses. The authors demonstrate the need for writing-in-the-discipline activities to enhance the writing skills of nursing students, describe the technical writing workshops they developed to mentor minority and disadvantaged nursing students, and provide recommendations to stimulate educator dialogue across disciplines and institutions.

  20. Technical evaluation of a CAD system for orthopaedic shoe-upper design.

    PubMed

    Lord, M; Foulston, J; Smith, P J

    1991-01-01

    Computer aided design is now employed routinely in the volume shoe trade. New styles are developed on a three-dimensional image of the last followed by automated pattern generation and engineering. It is suggested that such systems could be useful in the orthopaedic footwear industry although the different requirements for these bespoke products need careful consideration. A clinical trial has been conducted on the Shoemaster (Clarks Shoes) upper design system both to assess its technical capabilities and to consider its role in improvement of service and cosmetic appearance. This particular system works throughout on a three-dimensional representation of the shoe last, which offers particular advantages for integration with shape capture and reproduction. The report concentrates on the technical evaluation to assess (a) its ability to work with unusual last shapes dictated by medical requirements and (b) its potential for integration into a complete computer system for design of both shoe lasts and shoe uppers. The trial indicates that this particular system is promising in both respects.

  1. King 2 2519 ATM residual gyros: Reestablishing 5 year life requirements

    NASA Technical Reports Server (NTRS)

    Kayal, B.; Carbocci, L. J.

    1978-01-01

    The technical expertise required to assess the condition of the residual ATM 2519 Singer gyros is discussed. Past build history records, past performance characteristics, and recommendations for particular tests (which were performed by NASA personnel) are summarized. Test results are analyzed. A study of motor performance data and recommendations concerning gyro spin bearing life was performed. A method of reestablishing potential reliability of the bearing for the 5-year life requirement of the power module is also included.

  2. Quality Assurance Project Plan - Modeling the Impact of Hydraulic Fracturing on Water Resources Based on Water Acquisition Scenarios

    EPA Pesticide Factsheets

    This planning document describes the quality assurance/quality control activities and technical requirements that will be used during the research study. The goal of this project is to evaluate the potential impacts of large volume water withdrawals.

  3. Analysis of potential trade-offs in regulation of disinfection by-products

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cromwell, J.E.; Zhang, X.; Regli, S.

    1992-11-01

    Executive Order 12291 requires the preparation of a Regulatory Impact Analysis (RIA) on all new major federal regulations. The goal of an RIA is to develop and organize information on benefits, costs, and economic impacts so as to clarify trade-offs among alternative regulatory options. This paper outlines explicit methodology for assessing the technical potential for risk-risk tradeoffs. The strategies used to cope with complexities and uncertainties in developing the Disinfection By-Products Regulatory Analysis Model are explained. Results are presented and discussed in light of uncertainties, and in light of the analytical requirements for regulatory impact analysis.

  4. Integrating Safety and Mission Assurance into Systems Engineering Modeling Practices

    NASA Technical Reports Server (NTRS)

    Beckman, Sean; Darpel, Scott

    2015-01-01

    During the early development of products, flight, or experimental hardware, emphasis is often given to the identification of technical requirements, utilizing such tools as use case and activity diagrams. Designers and project teams focus on understanding physical and performance demands and challenges. It is typically only later, during the evaluation of preliminary designs that a first pass, if performed, is made to determine the process, safety, and mission quality assurance requirements. Evaluation early in the life cycle, though, can yield requirements that force a fundamental change in design. This paper discusses an alternate paradigm for using the concepts of use case or activity diagrams to identify safety hazard and mission quality assurance risks and concerns using the same systems engineering modeling tools being used to identify technical requirements. It contains two examples of how this process might be used in the development of a space flight experiment, and the design of a Human Powered Pizza Delivery Vehicle, along with the potential benefits to decrease development time, and provide stronger budget estimates.

  5. Career and Technical Education Administration: Requirements, Certification/Licensure, and Preparation

    ERIC Educational Resources Information Center

    Zirkle, Christopher J.; Jeffery, Jeremy O.

    2017-01-01

    The current climate of career and technical administration requirements in all 50 states was detailed and explored. An increasing number of states are not requiring specific career-technical administration certification/licensure in order to oversee secondary career and technical education (CTE) programs, with more states moving towards a general…

  6. Technical opportunities to reduce global anthropogenic emissions of nitrous oxide

    NASA Astrophysics Data System (ADS)

    Winiwarter, Wilfried; Höglund-Isaksson, Lena; Klimont, Zbigniew; Schöpp, Wolfgang; Amann, Markus

    2018-01-01

    We describe a consistent framework developed to quantify current and future anthropogenic emissions of nitrous oxide and the available technical abatement options by source sector for 172 regions globally. About 65% of the current emissions derive from agricultural soils, 8% from waste, and 4% from the chemical industry. Low-cost abatement options are available in industry, wastewater, and agriculture, where they are limited to large industrial farms. We estimate that by 2030, emissions can be reduced by about 6% ±2% applying abatement options at a cost lower than 10 €/t CO2-eq. The largest abatement potential at higher marginal costs is available from agricultural soils, employing precision fertilizer application technology as well as chemical treatment of fertilizers to suppress conversion processes in soil (nitrification inhibitors). At marginal costs of up to 100 €/t CO2-eq, about 18% ±6% of baseline emissions can be removed and when considering all available options, the global abatement potential increases to about 26% ±9%. Due to expected future increase in activities driving nitrous oxide emissions, the limited technical abatement potential available means that even at full implementation of reduction measures by 2030, global emissions can be at most stabilized at the pre-2010 level. In order to achieve deeper reductions in emissions, considerable technological development will be required as well as non-technical options like adjusting human diets towards moderate animal protein consumption.

  7. Rooftop Solar Technical Potential for Low-to-Moderate Income Households in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sigrin, Benjamin O; Mooney, Meghan E

    This report presents a first-of-kind assessment of the technical potential of rooftop solar for low and moderate-income households, as well as providing insight on the distribution of solar potential by tenure, income, and other building characteristics. We find that a substantial fraction of the national rooftop solar potential is located on LMI buildings and, for all incomes, a substantial fraction on multi-family and renter-occupied buildings. We also find that rooftop solar can significantly contribute to long-term penetration targets established by the U.S. DOE, though to do so requires deployment on multi-family and renter-occupied buildings. Traditional deployment models have insufficiently enabledmore » access to solar for these income groups and building types. Without innovation either in regulatory, market, or policy factors, a large fraction of the U.S. potential is unlikely to be addressed, as well as leading to inequalities in solar access. Ironically, potential electric bill savings from rooftop solar would have the greatest material impact on the lives of low-income households as compared to their high-income counterparts.« less

  8. Rooftop Solar Technical Potential for Low-to-Moderate Income (LMI) Households

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sigrin, Benjamin O

    This report presents a first-of-kind assessment of the technical potential of rooftop solar for low and moderate-income households, as well as providing insight on the distribution of solar potential by tenure, income, and other building characteristics. We find that a substantial fraction of the national rooftop solar potential is located on LMI buildings and, for all incomes, a substantial fraction on multi-family and renter-occupied buildings. We also find that rooftop solar can significantly contribute to long-term penetration targets established by the U.S. DOE, though to do so requires deployment on multi-family and renter-occupied buildings. Traditional deployment models have insufficiently enabledmore » access to solar for these income groups and building types. Without innovation either in regulatory, market, or policy factors, a large fraction of the U.S. potential is unlikely to be addressed, as well as leading to inequalities in solar access. Ironically, potential electric bill savings from rooftop solar would have the greatest material impact on the lives of low-income households as compared to their high-income counterparts.« less

  9. Phytotechnology Technical and Regulatory Guidance and Decision Trees, Revised

    DTIC Science & Technology

    2009-02-01

    upon planting . In other cases, it may require several seasons before the plant can interact with a contaminated zone at depth. Furthermore, it may...potential ecological exposures posed by the species planted need to be considered. The level of detail required is site specific and varies with the...to be assessed as well. However, the ecological exposure may not be directly from the consumption of the plant . Specifically, the U.S. Environmental

  10. Coal liquefaction processes and development requirements analysis for synthetic fuels production

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Focus of the study is on: (1) developing a technical and programmatic data base on direct and indirect liquefaction processes which have potential for commercialization during the 1980's and beyond, and (2) performing analyses to assess technology readiness and development trends, development requirements, commercial plant costs, and projected synthetic fuel costs. Numerous data sources and references were used as the basis for the analysis results and information presented.

  11. 75 FR 6683 - Notice of Proposed Information Collection: Comment Request; Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Information Collection: Comment Request; Technical Processing Requirements for Multifamily Project Mortgage... information: Title of Proposal: Technical Processing Requirements for Multifamily Project Mortgage Insurance... information collection requirement described below will be submitted to the Office of Management and Budget...

  12. H2@Scale: Technical and Economic Potential of Hydrogen as an Energy Intermediate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruth, Mark F; Jadun, Paige; Pivovar, Bryan S

    The H2@Scale concept is focused on developing hydrogen as an energy carrier and using hydrogen's properties to improve the national energy system. Specifically hydrogen has the abilities to (1) supply a clean energy source for industry and transportation and (2) increase the profitability of variable renewable electricity generators such as wind turbines and solar photovoltaic (PV) farms by providing value for otherwise potentially-curtailed electricity. Thus the concept also has the potential to reduce oil dependency by providing a low-carbon fuel for fuel cell electric vehicles (FCEVs), reduce emissions of carbon dioxide and pollutants such as NOx, and support domestic energymore » production, manufacturing, and U.S. economic competitiveness. The analysis reported here focuses on the potential market size and value proposition for the H2@Scale concept. It involves three analysis phases: 1. Initial phase estimating the technical potential for hydrogen markets and the resources required to meet them; 2. National-scale analysis of the economic potential for hydrogen and the interactions between willingness to pay by hydrogen users and the cost to produce hydrogen from various sources; and 3. In-depth analysis of spatial and economic issues impacting hydrogen production and utilization and the markets. Preliminary analysis of the technical potential indicates that the technical potential for hydrogen use is approximately 60 million metric tons (MMT) annually for light duty FCEVs, heavy duty vehicles, ammonia production, oil refining, biofuel hydrotreating, metals refining, and injection into the natural gas system. The technical potential of utility-scale PV and wind generation independently are much greater than that necessary to produce 60 MMT / year hydrogen. Uranium, natural gas, and coal reserves are each sufficient to produce 60 MMT / year hydrogen in addition to their current uses for decades to centuries. National estimates of the economic potential of hydrogen production using steam methane reforming of natural gas, high temperature electrolysis coupled with nuclear power plants, and low temperature electrolysis are reported. To generate the estimates, supply curves for those technologies are used. They are compared to demand curves that describe the market size for hydrogen uses and willingness to pay for that hydrogen. Scenarios are developed at prices where supply meets demand and are used to estimate energy use, emissions, and economic impacts.« less

  13. Techno-economic requirements for composite aircraft components

    NASA Technical Reports Server (NTRS)

    Palmer, Ray

    1993-01-01

    The primary reason for use of composites is to save structural weight. A well designed composite aircraft structure will usually save 25-30 percent of a well designed metal structure. The weight savings then translates into improved performance of the aircraft in measures of greater payload, increased flying range or improved efficiency - less use of fuel. Composite materials offer technical advantages. Key technical advantages that composites offer are high stiffness, tailored strength capability, fatigue resistance, and corrosion resistance. Low thermal expansion properties produce dimensionally stable structures over a wide range of temperature. Specialty resin 'char' forming characteristics in a fire environment offer potential fire barrier application and safer aircraft. The materials and processes of composite fabrication offer the potential for lower cost structures in the near future. The application of composite materials to aircraft are discussed.

  14. 38 CFR 61.52 - Threshold requirements for technical assistance grant applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...

  15. 38 CFR 61.52 - Threshold requirements for technical assistance grant applications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...

  16. 47 CFR 25.214 - Technical requirements for space stations in the Satellite Digital Audio Radio Service and...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...

  17. 47 CFR 25.214 - Technical requirements for space stations in the satellite digital audio radio service and...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...

  18. 47 CFR 25.214 - Technical requirements for space stations in the satellite digital audio radio service and...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...

  19. 47 CFR 25.214 - Technical requirements for space stations in the Satellite Digital Audio Radio Service and...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...

  20. 47 CFR 25.214 - Technical requirements for space stations in the satellite digital audio radio service and...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...

  1. Technical Needs for Prototypic Prognostic Technique Demonstration for Advanced Small Modular Reactor Passive Components

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meyer, Ryan M.; Coble, Jamie B.; Hirt, Evelyn H.

    2013-05-17

    This report identifies a number of requirements for prognostics health management of passive systems in AdvSMRs, documents technical gaps in establishing a prototypical prognostic methodology for this purpose, and describes a preliminary research plan for addressing these technical gaps. AdvSMRs span multiple concepts; therefore a technology- and design-neutral approach is taken, with the focus being on characteristics that are likely to be common to all or several AdvSMR concepts. An evaluation of available literature is used to identify proposed concepts for AdvSMRs along with likely operational characteristics. Available operating experience of advanced reactors is used in identifying passive components thatmore » may be subject to degradation, materials likely to be used for these components, and potential modes of degradation of these components. This information helps in assessing measurement needs for PHM systems, as well as defining functional requirements of PHM systems. An assessment of current state-of-the-art approaches to measurements, sensors and instrumentation, diagnostics and prognostics is also documented. This state-of-the-art evaluation, combined with the requirements, may be used to identify technical gaps and research needs in the development, evaluation, and deployment of PHM systems for AdvSMRs. A preliminary research plan to address high-priority research needs for the deployment of PHM systems to AdvSMRs is described, with the objective being the demonstration of prototypic prognostics technology for passive components in AdvSMRs. Greater efficiency in achieving this objective can be gained through judicious selection of materials and degradation modes that are relevant to proposed AdvSMR concepts, and for which significant knowledge already exists. These selections were made based on multiple constraints including the analysis performed in this document, ready access to laboratory-scale facilities for materials testing and measurement, and potential synergies with other national laboratory and university partners.« less

  2. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Preparation of technical...

  3. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Preparation of technical...

  4. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Preparation of technical...

  5. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Preparation of technical...

  6. 48 CFR 2052.211-70 - Preparation of technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Preparation of technical...

  7. Rapid Development: A Content Analysis Comparison of Literature and Purposive Sampling of AFRL Rapid Reaction Projects

    DTIC Science & Technology

    2011-12-01

    systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical

  8. 47 CFR 80.273 - Technical requirements for radar equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...

  9. 47 CFR 80.273 - Technical requirements for radar equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...

  10. Hearing Conservation in Schools [and] Safety and Health Legislation: Are You in Compliance?

    ERIC Educational Resources Information Center

    Gasaway, Donald C.; Kirk, Albert S.

    1995-01-01

    Because potentially hazardous noises abound in schools, especially in technical areas, this article describes ways to identify problems and help students and employees protect their hearing. Also looks at legislated requirements for blood-borne pathogens, laboratory safety, hazardous waste disposal, personal protective equipment, and other areas.…

  11. Representing System Behaviors and Expert Behaviors for Intelligent Tutoring. Technical Report No. 108.

    ERIC Educational Resources Information Center

    Towne, Douglas M.; And Others

    Simulation-based software tools that can infer system behaviors from a deep model of the system have the potential for automatically building the semantic representations required to support intelligent tutoring in fault diagnosis. The Intelligent Maintenance Training System (IMTS) is such a resource, designed for use in training troubleshooting…

  12. 40 CFR 35.4215 - What if my group can't find an adequate number of potential sources for a technical advisor or...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... number of potential sources for a technical advisor or other contractor? 35.4215 Section 35.4215... ASSISTANCE Grants for Technical Assistance Procuring A Technical Advisor Or Other Contractor with Tag Funds § 35.4215 What if my group can't find an adequate number of potential sources for a technical advisor...

  13. Civil Uses of Remotely Piloted Aircraft

    NASA Technical Reports Server (NTRS)

    Aderhold, J. R.; Gordon, G.; Scott, G. W.

    1976-01-01

    The economic, technical, and environmental implications of remotely piloted vehicles (RVP) are examined. The time frame is 1980-85. Representative uses are selected; detailed functional and performance requirements are derived for RPV systems; and conceptual system designs are devised. Total system cost comparisons are made with non-RPV alternatives. The potential market demand for RPV systems is estimated. Environmental and safety requirements are examined, and legal and regulatory concerns are identified. A potential demand for 2,000-11,000 RVP systems is estimated. Typical cost savings of 25 to 35% compared to non-RPV alternatives are determined. There appear to be no environmental problems, and the safety issue appears manageable.

  14. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  15. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  16. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  17. 16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  18. 47 CFR 15.15 - General technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 15.15 Section 15.15 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES General § 15.15 General technical requirements. (a) An intentional or unintentional radiator shall be...

  19. 47 CFR 80.659 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements. 80.659 Section 80.659 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Maritime Support Stations § 80.659 Technical requirements. The authorized frequency...

  20. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  1. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  2. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  3. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  4. 9 CFR 351.17 - Identification required.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...

  5. Process heat in California: Applications and potential for solar energy in the industrial, agricultural and commercial sectors

    NASA Technical Reports Server (NTRS)

    Barbieri, R. H.; Bartera, R. E.; Davis, E. S.; Hlavka, G. E.; Pivirotto, D. S.; Yanow, G.

    1978-01-01

    A summary of the results of a survey of potential applications of solar energy for supplying process heat requirements in the industrial, agricultural, and commercial sectors of California is presented. Technical, economic, and institutional characteristics of the three sectors are examined. Specific applications for solar energy are then discussed. Finally, implications for California energy policy are discussed along with recommendations for possible actions by the State of California.

  6. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  7. 78 FR 64146 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed... Information Collection Title of Information Collection: Technical Processing Requirements for Multifamily...

  8. Civil Uses of Remotely Piloted Aircraft

    NASA Technical Reports Server (NTRS)

    Aderhold, J. R.; Gordon, G.; Scott, G. W.

    1976-01-01

    The technology effort is identified and assessed that is required to bring the civil uses of RPVs to fruition and to determine whether or not the potential market is real and economically practical, the technologies are within reach, the operational problems are manageable, and the benefits are worth the cost. To do so, the economic, technical, and environmental implications are examined. The time frame is 1980-85. Representative uses are selected; detailed functional and performance requirements are derived for RPV systems; and conceptual system designs are devised. Total system cost comparisons are made with non-RPV alternatives. The potential market demand for RPV systems is estimated. Environmental and safety requirements are examined, and legal and regulatory concerns are identified. A potential demand for 2,000-11,000 RPV systems is estimated. Typical cost savings of 25-35% compared to non-RPV alternatives are determined. There appear to be no environmental problems, and the safety issue appears manageable.

  9. 16 CFR § 1401.5 - Providing performance and technical data to purchasers by labeling.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...

  10. Polymer electrolyte fuel cells: Potential transportation and stationary applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gottesfeld, S.

    1993-01-01

    The application of the polymer electrolyte fuel cell (PEFC) as a primary power source in electric vehicles has received increasing attention during the last few years. This increased attention is the result of a combination of significant technical advances in this fuel cell technology and the initiation of some projects for the demonstration of a complete, PEFC-based power system a bus or in a passenger car. Such demonstration projects reflect an increase in industry's faith in the potential of this technology for transportation applications, or, at least, in the need for a detailed evaluation of this potential. Nevertheless, large scalemore » transportation applications of PEFCs require a continued concerted effort of research on catalysis, materials and components, combined with the engineering efforts addressing the complete power system. This is required to achieve a cost effective, highly performing PEFC stack and power system. A related set of technical and cost challenges arises in the context of potential applications of PEFCs for stationary power applications, although there are clearly some differences in their nature, particularly, to do with the different types of fuels to be employed for each of these applications. We describe in this contribution some recent results of work performed by the Core Research PEFC Program at Los Alamos National Laboratory, which has addressed materials, components and single cell testing of PEFCS. Also included are some recent observations and some insights regarding the potential of this fuel cell technology for stationary Power generation.« less

  11. Polymer electrolyte fuel cells: Potential transportation and stationary applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gottesfeld, S.

    1993-04-01

    The application of the polymer electrolyte fuel cell (PEFC) as a primary power source in electric vehicles has received increasing attention during the last few years. This increased attention is the result of a combination of significant technical advances in this fuel cell technology and the initiation of some projects for the demonstration of a complete, PEFC-based power system a bus or in a passenger car. Such demonstration projects reflect an increase in industry`s faith in the potential of this technology for transportation applications, or, at least, in the need for a detailed evaluation of this potential. Nevertheless, large scalemore » transportation applications of PEFCs require a continued concerted effort of research on catalysis, materials and components, combined with the engineering efforts addressing the complete power system. This is required to achieve a cost effective, highly performing PEFC stack and power system. A related set of technical and cost challenges arises in the context of potential applications of PEFCs for stationary power applications, although there are clearly some differences in their nature, particularly, to do with the different types of fuels to be employed for each of these applications. We describe in this contribution some recent results of work performed by the Core Research PEFC Program at Los Alamos National Laboratory, which has addressed materials, components and single cell testing of PEFCS. Also included are some recent observations and some insights regarding the potential of this fuel cell technology for stationary Power generation.« less

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamilton, Bruce Duncan

    The objective of the report is to provide an assessment of the domestic supply chain and manufacturing infrastructure supporting the U.S. offshore wind market. The report provides baseline information and develops a strategy for future development of the supply chain required to support projected offshore wind deployment levels. A brief description of each of the key chapters includes: » Chapter 1: Offshore Wind Plant Costs and Anticipated Technology Advancements. Determines the cost breakdown of offshore wind plants and identifies technical trends and anticipated advancements in offshore wind manufacturing and construction. » Chapter 2: Potential Supply Chain Requirements and Opportunities. Providesmore » an organized, analytical approach to identifying and bounding the uncertainties associated with a future U.S. offshore wind market. It projects potential component-level supply chain needs under three demand scenarios and identifies key supply chain challenges and opportunities facing the future U.S. market as well as current suppliers of the nation’s land-based wind market. » Chapter 3: Strategy for Future Development. Evaluates the gap or competitive advantage of adding manufacturing capacity in the U.S. vs. overseas, and evaluates examples of policies that have been successful . » Chapter 4: Pathways for Market Entry. Identifies technical and business pathways for market entry by potential suppliers of large-scale offshore turbine components and technical services. The report is intended for use by the following industry stakeholder groups: (a) Industry participants who seek baseline cost and supplier information for key component segments and the overall U.S. offshore wind market (Chapters 1 and 2). The component-level requirements and opportunities presented in Section 2.3 will be particularly useful in identifying market sizes, competition, and risks for the various component segments. (b) Federal, state, and local policymakers and economic development agencies, to assist in identifying policies with low effort and high impact (Chapter 3). Section 3.3 provides specific policy examples that have been demonstrated to be effective in removing barriers to development. (c) Current and potential domestic suppliers in the offshore wind market, in evaluating areas of opportunity and understanding requirements for participation (Chapter 4). Section 4.4 provides a step-by-step description of the qualification process that suppliers looking to sell components into a future U.S. offshore wind market will need to follow.« less

  13. 78 FR 65695 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Correction, notice. SUMMARY: On October 25, 2013 at... Collection Title of Information Collection: Technical Processing Requirements for Multifamily Project...

  14. 47 CFR 15.517 - Technical requirements for indoor UWB systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for indoor UWB systems. 15.517 Section 15.517 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.517 Technical requirements for indoor UWB systems. (a) Operation...

  15. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  16. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  17. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  18. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  19. 47 CFR 15.511 - Technical requirements for surveillance systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...

  20. 30 CFR 7.404 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Technical requirements. 7.404 Section 7.404 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND... Cable Splice Kits § 7.404 Technical requirements. (a) Electric cables and splices shall be flame...

  1. Review of PREPA Technical Requirements for Interconnecting Wind and Solar Generation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gevorgian, Vahan; Booth, Sarah

    2013-11-01

    The Puerto Rico Electric Power Authority developed the minimum technical requirements for interconnection of wind turbine generation and photovoltaic power plants. NREL has conducted a review of these requirements based on generic technical aspects and electrical characteristics of wind and photovoltaic power plants, and on existing requirements from other utilities (both U.S. and European).

  2. Spray forming -- Aluminum: Third annual report (Phase 2). Technical progress -- Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kozarek, R.L.

    1998-04-20

    Commercial production of aluminum sheet and plate by spray atomization and deposition is a potentially attractive manufacturing alternative to conventional ingot metallurgy/hot-milling and to continuous casting processes because of reduced energy requirements and reduced cost. To realize the full potential of the technology, the Aluminum Company of America (Alcoa), under contract by the US Department of Energy, is investigating currently available state-of-the-art atomization devices to develop nozzle design concepts whose spray characteristics are tailored for continuous sheet production. This third technical progress report will summarize research and development work conducted during the period 1997 October through 1998 March. Included aremore » the latest optimization work on the Alcoa III nozzle, results of spray forming runs with 6111 aluminum alloy and preliminary rolling trials of 6111 deposits.« less

  3. Energy futures: Trading opportunities for the 1980's

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Treat, J.E.; Cowie, S.; Davidson, F.E.

    1984-01-01

    This text gives a broad background in both theory and practice of energy futures trading. It details successful contract requirements. It analyzes fundamental and technical pricing and using both to manage risk and achieve trading objectives. Hedging strategy, financial aspects of trading, accounting procedures, internal control systems and tax implications are all expertly covered. The book concludes with the potential impact of futures trading on the structure of world markets. Contents: Energy futures: an overview; Exchanges and their contracts; Fundamental analysis and the theory of hedging; The principles of technical analysis; Putting it all together; Integrated trading strategies; Energy futures;more » Financing and exposure management in the oil industry; Accounting principles, taxation, and internal control; The potential impacts of trading in oil futures on the world oil market; Appendix; Glossary; Index.« less

  4. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  5. Mass Spectrometry Strategies for Clinical Metabolomics and Lipidomics in Psychiatry, Neurology, and Neuro-Oncology

    PubMed Central

    Wood, Paul L

    2014-01-01

    Metabolomics research has the potential to provide biomarkers for the detection of disease, for subtyping complex disease populations, for monitoring disease progression and therapy, and for defining new molecular targets for therapeutic intervention. These potentials are far from being realized because of a number of technical, conceptual, financial, and bioinformatics issues. Mass spectrometry provides analytical platforms that address the technical barriers to success in metabolomics research; however, the limited commercial availability of analytical and stable isotope standards has created a bottleneck for the absolute quantitation of a number of metabolites. Conceptual and financial factors contribute to the generation of statistically under-powered clinical studies, whereas bioinformatics issues result in the publication of a large number of unidentified metabolites. The path forward in this field involves targeted metabolomics analyses of large control and patient populations to define both the normal range of a defined metabolite and the potential heterogeneity (eg, bimodal) in complex patient populations. This approach requires that metabolomics research groups, in addition to developing a number of analytical platforms, build sufficient chemistry resources to supply the analytical standards required for absolute metabolite quantitation. Examples of metabolomics evaluations of sulfur amino-acid metabolism in psychiatry, neurology, and neuro-oncology and of lipidomics in neurology will be reviewed. PMID:23842599

  6. Mass spectrometry strategies for clinical metabolomics and lipidomics in psychiatry, neurology, and neuro-oncology.

    PubMed

    Wood, Paul L

    2014-01-01

    Metabolomics research has the potential to provide biomarkers for the detection of disease, for subtyping complex disease populations, for monitoring disease progression and therapy, and for defining new molecular targets for therapeutic intervention. These potentials are far from being realized because of a number of technical, conceptual, financial, and bioinformatics issues. Mass spectrometry provides analytical platforms that address the technical barriers to success in metabolomics research; however, the limited commercial availability of analytical and stable isotope standards has created a bottleneck for the absolute quantitation of a number of metabolites. Conceptual and financial factors contribute to the generation of statistically under-powered clinical studies, whereas bioinformatics issues result in the publication of a large number of unidentified metabolites. The path forward in this field involves targeted metabolomics analyses of large control and patient populations to define both the normal range of a defined metabolite and the potential heterogeneity (eg, bimodal) in complex patient populations. This approach requires that metabolomics research groups, in addition to developing a number of analytical platforms, build sufficient chemistry resources to supply the analytical standards required for absolute metabolite quantitation. Examples of metabolomics evaluations of sulfur amino-acid metabolism in psychiatry, neurology, and neuro-oncology and of lipidomics in neurology will be reviewed.

  7. Coordinating activities between NOAA and other agencies.

    PubMed

    Fritz, A T; Buchman, M F

    1997-11-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) mandate protection of public health, welfare, and the environment at Superfund hazardous waste sites. The NCP requires lead response agenciesto integrate baseline risk assessments into the remedial process that "assess threats to the environment." EPA policy statements direct regional offices to perform thorough, consistent ecological risk assessments, and stress the importance of coordination and technical consultation with the natural resource trustees. As a Federal natural trustee, the National Oceanic and Atmospheric Administration's (NOAA) role and responsibilities within the CERCLA process also are defined and mandated by Federal law. NOAA is responsible for identifying sites in the coastal zone that may affect natural resources, evaluating injury to trust resources, and providing technical advice on assessments and remedial and restoration alternatives. Statutes require lead cleanup agencies and trustee agencies to notify and coordinate with each other during CERCLA response. Over the past ten years, NOAA has gained valuable experience and technical expertise in environmental assessments and in evaluating contaminated aquatic environments. NOAA fulfills its responsibilities through an effective network of Coastal Resource Coordinators (CRCs) who can rapidly respond to local technical requirements and priorities, and coordinate effectively with technical and trustee representatives. In addition to CRCs, an interdisciplinary support group provides technical expertise in the scientific disciplines required to respond to the needs of regional activities. NOAA provides CRCs to coastal EPA regional offices for technical support, and to act as liaisons with Federal and state natural resource trustee agencies. The CRCs help EPA and other lead response agencies identify and assess risks to coastal resources from hazardous waste sites and to develop cost-effective strategies to minimize those risks. Notification of trustees of potential natural resource injuries and coordination of subsequent investigations helps Federal and state trustees to carry out their responsibilities effectively. Trustees' early involvement in the scoping of ecological risk assessments ensures that assessments and the entire remedial process adequately evaluate the risk to trust resources. Coordination throughout the process makes it easier to develop cost-effective and protective remedies that enhance the recovery of natural resources. Examples of NOAA's successful coordination and cooperative ecological risk assessments will be presented in brief case studies for both EPA and Department of Defense (DOD) lead sites.

  8. 47 CFR 15.513 - Technical requirements for medical imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for medical imaging systems. 15.513 Section 15.513 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.513 Technical requirements for medical imaging systems. (a) The UWB...

  9. 77 FR 29247 - Federal Motor Vehicle Safety Standards; Occupant Crash Protection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ...). ACTION: Final rule; technical amendments. SUMMARY: This final rule makes technical amendments to Federal... advanced air bag requirements. As written now, the general warning label requirements contain an explicit... equipment requirements for restraint systems. This document makes technical amendments to several of the...

  10. 75 FR 18505 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-12

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0165] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal... veterinary use by the International Cooperation on Harmonisation of Technical Requirements for Registration...

  11. Evaluation of Cabin Crew Technical Knowledge

    NASA Technical Reports Server (NTRS)

    Dunbar, Melisa G.; Chute, Rebecca D.; Jordan, Kevin

    1998-01-01

    Accident and incident reports have indicated that flight attendants have numerous opportunities to provide the flight-deck crew with operational information that may prevent or essen the severity of a potential problem. Additionally, as carrier fleets transition from three person to two person flight-deck crews, the reliance upon the cabin crew for the transfer of this information may increase further. Recent research (Chute & Wiener, 1996) indicates that light attendants do not feel confident in their ability to describe mechanical parts or malfunctions of the aircraft, and the lack of flight attendant technical training has been referenced in a number of recent reports (National Transportation Safety Board, 1992; Transportation Safety Board of Canada, 1995; Chute & Wiener, 1996). The present study explored both flight attendant technical knowledge and flight attendant and dot expectations of flight attendant technical knowledge. To assess the technical knowledge if cabin crewmembers, 177 current flight attendants from two U.S. carriers voluntarily :ompleted a 13-item technical quiz. To investigate expectations of flight attendant technical knowledge, 181 pilots and a second sample of 96 flight attendants, from the same two airlines, completed surveys designed to capture each group's expectations of operational knowledge required of flight attendants. Analyses revealed several discrepancies between the present level of flight attendants.

  12. 77 FR 30473 - Notice of Intent To Revise Stormwater Regulations To Specify That an NPDES Permit Is Not Required...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... submit for approval by the Washington Department of Natural Resources (DNR) a Road Maintenance and... potential road maintenance problems. While the program is enforceable, the state focuses first on technical... the maintenance of roads within and near the public lands and perform that work, in part, by...

  13. Woody biomass outreach in the southern United States: A case study

    Treesearch

    Martha Monroe; Annie Oxarart

    2011-01-01

    Woody biomass is one potential renewable energy source that is technically feasible where environmental and economic factors are promising. It becomes a realistic option when it is also socially acceptable. Public acceptance and support of wood to energy proposals require community education and outreach. The Wood to Energy Outreach Program provides science-based...

  14. Digital Avionics Information System (DAIS): Impact of DAIS Concept on Life Cycle Cost--Supplement. Final Report.

    ERIC Educational Resources Information Center

    Goclowski, John C.; And Others

    This supplement to a technical report providing the results of a preliminary investigation of the potential impact of the Digital Avionics Information System (DAIS) concept on system support personnel requirements and life cycle cost (LCC) includes: (1) additional details of the cost comparison of a hypothetical application of a conceptual…

  15. The Need for Careful Data Collection for Pattern Recognition in Digital Pathology.

    PubMed

    Marée, Raphaël

    2017-01-01

    Effective pattern recognition requires carefully designed ground-truth datasets. In this technical note, we first summarize potential data collection issues in digital pathology and then propose guidelines to build more realistic ground-truth datasets and to control their quality. We hope our comments will foster the effective application of pattern recognition approaches in digital pathology.

  16. Study for Identification of Beneficial Uses of Space (BUS). Volume 2: Technical report. Book 4: Development and business analysis of space processed surface acoustic wave devices

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Preliminary development plans, analysis of required R and D and production resources, the costs of such resources, and, finally, the potential profitability of a commercial space processing opportunity for the production of very high frequency surface acoustic wave devices are presented.

  17. Optical Computing, 1991, Technical Digest Series, Vol. 6

    DTIC Science & Technology

    1992-05-22

    lasers). Compound semiconductors may satisfy these requirements. For example, optical signal amplification by two-beam coupling and amplified phase... compound semiconductors can provide this type of implementationi. This paper presents results from a detailed investigation on potentials of the...conductivity to achieve high multichannel cell performance. We describe several high performance Gallium Phosphide multichannel Bragg cells which employ these

  18. Sequestration of vacuum energy and the end of the universe.

    PubMed

    Kaloper, Nemanja; Padilla, Antonio

    2015-03-13

    Recently, we proposed a mechanism for sequestering the standard model vacuum energy that predicts that the Universe will collapse. Here we present a simple mechanism for bringing about this collapse, employing a scalar field whose potential is linear and becomes negative, providing the negative energy density required to end the expansion. The slope of the potential is chosen to allow for the expansion to last until the current Hubble time, about 10^{10} years, to accommodate our Universe. Crucially, this choice is technically natural due to a shift symmetry. Moreover, vacuum energy sequestering selects radiatively stable initial conditions for the collapse, which guarantee that immediately before the turnaround the Universe is dominated by the linear potential which drives an epoch of accelerated expansion for at least an e fold. Thus, a single, technically natural choice for the slope ensures that the collapse is imminent and is preceded by the current stage of cosmic acceleration, giving a new answer to the "why now?"

  19. 40 CFR 58.11 - Network technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...

  20. 40 CFR 58.11 - Network technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...

  1. 47 CFR 15.510 - Technical requirements for through D-wall imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for through D-wall imaging systems. 15.510 Section 15.510 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.510 Technical requirements for through D-wall imaging...

  2. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  3. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  4. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  5. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  6. 47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...

  7. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  8. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  9. 47 CFR 15.515 - Technical requirements for vehicular radar systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...

  10. 42 CFR 493.1838 - Training and technical assistance for unsuccessful participation in proficiency testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Training and technical assistance for unsuccessful... REQUIREMENTS Enforcement Procedures § 493.1838 Training and technical assistance for unsuccessful participation... may require the laboratory to undertake training of its personnel, or to obtain necessary technical...

  11. 22 CFR 124.8 - Clauses required both in manufacturing license agreements and technical assistance agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... agreements and technical assistance agreements. 124.8 Section 124.8 Foreign Relations DEPARTMENT OF STATE... Clauses required both in manufacturing license agreements and technical assistance agreements. The following statements must be included both in manufacturing license agreements and in technical assistance...

  12. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  13. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  14. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  15. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  16. 9 CFR 351.16 - Certificate required for shipments of technical animal fat.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...

  17. Development of drilling foams for geothermal applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDonald, W.J.; Remont, L.J.; Rehm, W.A.

    The use of foam drilling fluids in geothermal applications is addressed. A description of foams - what they are, how they are used, their properties, equipment required to use them, the advantages and disadvantages of foams, etc. - is presented. Geothermal applications are discussed. Results of industry interviews presented indicate significant potential for foams, but also indicate significant technical problems to be solved to achieve this potential. Testing procedures and results of tests on representative foams provide a basis for work to develop high-temperature foams.

  18. Qualifizierung für "Industrie 4.0". Facharbeit in Deutschland und deutschen Auslandsniederlassungen in Emerging Economies

    NASA Astrophysics Data System (ADS)

    Fuchs, Martina; Pilz, Matthias; Wiemann, Judith; Wiemann, Kristina

    2017-06-01

    Frey and Osbourne's (2013) notion of the end of professional technical skills caused by Industry 4.0 (smart manufacturing), also known as increasing polarisation into "lousy and lovely jobs", is a topical issue. This contribution is a critical review of this idea in the context of German multinational companies, many of which are intensifying their efforts to introduce international customer-oriented quality production, digital high-tech and new human-machine-interfaces. Such high-tech production requires that the companies further internationalise practices of the German technical vocational education and training to emerging economies as Mexico, India and China. For German multinational companies this rather suggests an increase in professional technical skills (also on an international level) and less so rationalisation potentials in this particular segment of production work.

  19. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  20. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  1. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  2. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  3. 15 CFR 911.8 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...

  4. Marketability requirements for fault detection and diagnostics in commercial buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heinemeier, K.H.

    Fault Detection and Diagnostics (FDD) is a technology that has a great potential for improving performance and reducing energy consumed in commercial buildings, and is rapidly becoming feasible for the buildings sector. Scientists have developed algorithms for FDD, and are making plans for field-testing and demonstration of these methods in real buildings. These efforts will provide a sound technical basis for FDD product offerings. FDD has the potential to dramatically improve the quality of operation of buildings. However, progress on technical issues is only one step towards implementing FDD in the market. FDD cannot be expected to have a majormore » impact on buildings unless market issues are addressed. Many questions will have to be answered regarding the users of FDD systems, the usability of the product, the market for FDD, and the nature of possible FDD offerings. It is crucial to consider marketing issues in parallel with the more technical issues. Constraints and opportunities that will be faced in marketing the products must be recognized early in technology development, and addressed and integrated into designs to ensure an appropriate system design. This paper identified a number of key questions that will arise in addressing marketability issues. These questions will have to be answered individually by technology developers and entities intending to market FDD. This paper presents some of the considerations that must go into the answering the questions, and provides a framework for analyzing the market requirements.« less

  5. The evaluation of a framework for measuring the non-technical ward round skills of final year nursing students: An observational study.

    PubMed

    Murray, Kara; McKenzie, Karen; Kelleher, Michael

    2016-10-01

    The importance of non-technical skills (NTS) to patient outcomes is increasingly being recognised, however, there is limited research into how such skills can be taught and evaluated in student nurses in relation toward rounds. This pilot study describes an evaluation of a NTS framework that could potentially be used to measure ward round skills of student nurses. The study used an observational design. Potential key NTS were identified from existing literature and NTS taxonomies. The proposed framework was then used to evaluate whether the identified NTS were evident in a series of ward round simulations that final year general nursing students undertook as part of their training. Finally, the views of a small group of qualified nurse educators, qualified nurses and general nursing students were sought about whether the identified NTS were important and relevant to practice. The proposed NTS framework included seven categories: Communication, Decision Making, Situational Awareness, Teamwork and Task Management, Student Initiative and Responsiveness to Patient. All were rated as important and relevant to practice. The pilot study suggests that the proposed NTS framework could be used as a means of evaluating student nurse competencies in respect of many non-technical skills required for a successful ward round. Further work is required to establish the validity of the framework in educational settings and to determine the extent to which it is of use in a non-simulated ward round setting. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. TECHNICAL MANPOWER IN NEW YORK STATE. VOLUME II.

    ERIC Educational Resources Information Center

    AMATULLI, ANGELO; AND OTHERS

    THE JOB CONTENT OF THE TECHNICAL OCCUPATIONS AND THE TECHNICAL SKILLS AND SUBJECT MATTER KNOWLEDGES REQUIRED ARE BASED PRIMARILY ON INFORMATION SUPPLIED BY EMPLOYERS FROM 17,414 ESTABLISHMENTS IN NEW YORK STATE. DATA ARE ALSO GIVEN ON GRADE STRUCTURE, EDUCATION AND EXPERIENCE REQUIREMENTS, TESTS AND LICENSES REQUIRED FOR THE JOB, SOURCES OF…

  7. Technical Communication Internship Requirements in the Academic Economy: How We Compare among Ourselves and across Other Applied Fields

    ERIC Educational Resources Information Center

    Savage, Gerald J.; Seible, Marcea K.

    2010-01-01

    This article reports a study of internship requirements in technical communication programs compared with three established professions and one emerging profession that have certification or licensing requirements for practitioners. The study addresses three questions about technical communication internship programs: 1) Are internships offered as…

  8. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  9. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  10. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  11. 47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...

  12. 38 CFR 61.52 - Threshold requirements for technical assistance grant applications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Threshold requirements for technical assistance grant applications. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.52 Threshold requirements for technical assistanc...

  13. 38 CFR 61.52 - Technical assistance grant application packages-threshold requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Technical assistance grant application packages-threshold requirements. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM Technical Assistance Grants § 61.52 Technical...

  14. 38 CFR 61.52 - Technical assistance grant application packages-threshold requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Technical assistance grant application packages-threshold requirements. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM Technical Assistance Grants § 61.52 Technical...

  15. 44 CFR 65.3 - Requirement to submit new technical data.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... available, a community shall notify the Administrator of the changes by submitting technical or scientific... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.3 Requirement to submit new technical data. A community's...

  16. Communication satellites to enter a new age of flexibility

    NASA Astrophysics Data System (ADS)

    Balty, Cédric; Gayrard, Jean-Didier; Agnieray, Patrick

    2009-07-01

    To cope with the economical and technical evolutions of the communication market and to better compete with or complement terrestrial networks, satellite operators are requiring more flexible satellites. It allows a better fleet planning potential and back-up policy, a more standardized and efficient procurement process, mission adaptation to market evolution and the possibility of early entry in new markets. New technologies that are developed either for terrestrial networks or for space defense applications would become soon available to satellite and equipment manufacturers. A skilful mix of these new technologies with the older and more mature ones should boost satellite performances and bring flexibility to the new generation of communication satellites. This paper reviews the economical and technical environment of the space communication business for the next decade. It identifies the needs and levels of flexibility that are required by the market but also allowed by technologies, in both a top-down and bottom-up approach.

  17. Illustrating anticipatory life cycle assessment for emerging photovoltaic technologies.

    PubMed

    Wender, Ben A; Foley, Rider W; Prado-Lopez, Valentina; Ravikumar, Dwarakanath; Eisenberg, Daniel A; Hottle, Troy A; Sadowski, Jathan; Flanagan, William P; Fisher, Angela; Laurin, Lise; Bates, Matthew E; Linkov, Igor; Seager, Thomas P; Fraser, Matthew P; Guston, David H

    2014-09-16

    Current research policy and strategy documents recommend applying life cycle assessment (LCA) early in research and development (R&D) to guide emerging technologies toward decreased environmental burden. However, existing LCA practices are ill-suited to support these recommendations. Barriers related to data availability, rapid technology change, and isolation of environmental from technical research inhibit application of LCA to developing technologies. Overcoming these challenges requires methodological advances that help identify environmental opportunities prior to large R&D investments. Such an anticipatory approach to LCA requires synthesis of social, environmental, and technical knowledge beyond the capabilities of current practices. This paper introduces a novel framework for anticipatory LCA that incorporates technology forecasting, risk research, social engagement, and comparative impact assessment, then applies this framework to photovoltaic (PV) technologies. These examples illustrate the potential for anticipatory LCA to prioritize research questions and help guide environmentally responsible innovation of emerging technologies.

  18. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  19. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  20. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  1. 13 CFR 306.2 - Award requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...

  2. Solar energy in California industry - Applications, characteristics and potential

    NASA Technical Reports Server (NTRS)

    Barbieri, R. H.; Pivirotto, D. S.

    1978-01-01

    Results of a survey to determine the potential applicability of solar thermal energy to industrial processes in California are presented. It is found that if the heat for all industrial processes at temperatures below 212 F were supplied by solar energy, total state energy consumption could be reduced by 100 trillion Btus (2%), while the use of solar energy in processes between 212 and 350 F could displace 500 trillion Btus. The issues and problems with which solar energy must contend are illustrated by a description of fluid milk processing operations. Solar energy application is found to be technically feasible for processes with thermal energy requirements below 212 F, with design, and degree of technical, economic and management feasibility being site specific. It is recommended that the state provide support for federal and industrial research, development and demonstration programs in order to stimulate acceptance of solar process heat application by industry.

  3. GRACE Follow-On and Potential Successors: Mission Options for the Upcoming Decadaes

    NASA Astrophysics Data System (ADS)

    Watkins, M. M.

    2017-12-01

    The GRACE Follow-On mission is currently scheduled to launch in the first quarter of 2018, providing a successor to GRACE for ongoing critical measurements of Earth's time varying mass distribution for the coming decade. As noted in the literature (and in several talks in this session), there are also several possible mission proposals and technologies to either augment or succeed GRACE FO for extended and improved measurements. Various scientific, programmatic, and technical issues drive each of these potential missions and these factors will be important in determining which will ultimately be selected for flight. These issues include accuracy requirements based on science goals, technical maturity, cost, and international partnership options. In this talk, we will provide a final detailed update before launch on the GRACE Follow-On status and expectations, and we will outline several of the key options for future missions after GRACE FO.

  4. Low- and Moderate-Income Residences Can Help Modernize the U.S. Electric

    Science.gov Websites

    of the United States, divided by county, is color-coded by the total solar technical potential Chicago region, show the greatest technical potential. The report breaks down the total potential for rooftop solar could contribute up to 42 percent of all rooftop technical potential in the residential

  5. A Procedural Skills OSCE: Assessing Technical and Non-Technical Skills of Internal Medicine Residents

    ERIC Educational Resources Information Center

    Pugh, Debra; Hamstra, Stanley J.; Wood, Timothy J.; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges

    2015-01-01

    Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal…

  6. Monitored Natural Attenuation of Inorganic Contaminants in Ground Water Volume 3 Assessment for Radionuclides IncludingTritium, Radon, Strontium, Technetium, Uranium, Iodine, Radium, Thorium, Cesium, and Plutonium-Americium

    EPA Science Inventory

    The current document represents the third volume of a set of three volumes that address the technical basis and requirements for assessing the potential applicability of MNA as part of a ground-water remedy for plumes with nonradionuclide and/or radionuclide inorganic contamina...

  7. Monitored Attenuation of Inorganic Contaminants in Ground Water Volume 2 – Assessment for Non-Radionuclides Including Arsenic, Cadmium, Chromium, Copper, Lead, Nickel, Nitrate, Perchlorate, and Selenium

    EPA Science Inventory

    This document represents the second volume of a set of three volumes that address the technical basis and requirements for assessing the potential applicability of MNA as part of a ground-water remedy for plumes with non-radionuclide and/or radionuclide inorganic contaminants. V...

  8. Two-Black Box Concept for Warhead Verification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bates, Cameron Russell; Frame, Katherine Chiyoko; Mckigney, Edward Allen

    2017-03-06

    We have created a possible solution to meeting the requirements of certification/authentication while still employing complicated criteria. Technical solutions to protecting information from the host in an inspection environment needs to be assessed by those with specific expertise but, LANL can still study the verification problem. The two-black box framework developed provides another potential solution to the confidence vs. certification paradox.

  9. A Potential Theory for the Steady Separated Flow about an Aerofoil Section

    DTIC Science & Technology

    1988-02-01

    Adviser (3 copies Doc Data sheet) Aircraft Maintenance and Flight Trials Unit Director of Naval Aircraft Engineering Director of Naval Air Warfare...Superintendent, Aircraft Maintenance and Repair Army Office Scientific Adviser - Army (Doc Data sheet only) Engineering Development Establishment, Library...Flight Group Library Technical Division Library Director General Aircraft Engineering - Air Force Director General Operational Requirements - Air Force

  10. Developing the Systems Engineering Experience Accelerator (SEEA) Prototype and Roadmap

    DTIC Science & Technology

    2012-10-24

    system attributes. These metrics track non-requirements performance, typically relate to production cost per unit, maintenance costs, training costs...immediately implement lessons learned from the training experience to the job, assuming the culture allows this. 1.3 MANAGEMENT PLAN/TECHNICAL OVERVIEW...resolving potential conflicts as they arise. Incrementally implement and continuously integrate capability in priority order, to ensure that final system

  11. Technical options for high average power free electron milimeter-wave and laser devices

    NASA Technical Reports Server (NTRS)

    Swingle, James C.

    1989-01-01

    Many of the potential space power beaming applications require the generation of directed energy beams with respectable amounts of average power (MWs). A tutorial summary is provided here on recent advances in the laboratory aimed at producing direct conversion of electrical energy to electromagnetic radiation over a wide spectral regime from microwaves to the ultraviolet.

  12. Using Life-Cycle Human Factors Engineering to Avoid $2.4 Million in Costs: Lessons Learned from NASA's Requirements Verification Process for Space Payloads

    NASA Technical Reports Server (NTRS)

    Carr, Daniel; Ellenberger, Rich

    2008-01-01

    The Human Factors Implementation Team (HFIT) process has been used to verify human factors requirements for NASA International Space Station (ISS) payloads since 2003, resulting in $2.4 million in avoided costs. This cost benefit has been realized by greatly reducing the need to process time-consuming formal waivers (exceptions) for individual requirements violations. The HFIT team, which includes astronauts and their technical staff, acts as the single source for human factors requirements integration of payloads. HFIT has the authority to provide inputs during early design phases, thus eliminating many potential requirements violations in a cost-effective manner. In those instances where it is not economically or technically feasible to meet the precise metric of a given requirement, HFIT can work with the payload engineers to develop common sense solutions and formally document that the resulting payload design does not materially affect the astronaut s ability to operate and interact with the payload. The HFIT process is fully ISO 9000 compliant and works concurrently with NASA s formal systems engineering work flow. Due to its success with payloads, the HFIT process is being adapted and extended to ISS systems hardware. Key aspects of this process are also being considered for NASA's Space Shuttle replacement, the Crew Exploration Vehicle.

  13. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less

  14. A stochastic frontier analysis of technical efficiency of fish cage culture in Peninsular Malaysia.

    PubMed

    Islam, Gazi Md Nurul; Tai, Shzee Yew; Kusairi, Mohd Noh

    2016-01-01

    Cage culture plays an important role in achieving higher output and generating more export earnings in Malaysia. However, the cost of fingerlings, feed and labour have increased substantially for cage culture in the coastal areas in Peninsular Malaysia. This paper uses farm level data gathered from Manjung, Perak and Kota Tinggi, Johor to investigate the technical efficiency of brackish water fish cage culture using the stochastic frontier approach. The technical efficiency was estimated and specifically the factors affecting technical inefficiencies of fish cage culture system in Malaysia was investigated. On average, 37 percent of the sampled fish cage farms are technically efficient. The results suggest very high degrees of technical inefficiency exist among the cage culturists. This implies that great potential exists to increase fish production through improved efficiency in cage culture management in Peninsular Malaysia. The results indicate that farmers obtained grouper fingerlings from other neighboring countries due to scarcity of fingerlings from wild sources. The cost of feeding for grouper (Epinephelus fuscoguttatus) requires relatively higher costs compared to seabass (Lates calcarifer) production in cage farms in the study areas. Initiatives to undertake extension programmes at the farm level are needed to help cage culturists in utilizing their resources more efficiently in order to substantially enhance their fish production.

  15. Systems and technologies for objective evaluation of technical skills in laparoscopic surgery.

    PubMed

    Sánchez-Margallo, Juan A; Sánchez-Margallo, Francisco M; Oropesa, Ignacio; Gómez, Enrique J

    2014-01-01

    Minimally invasive surgery is a highly demanding surgical approach regarding technical requirements for the surgeon, who must be trained in order to perform a safe surgical intervention. Traditional surgical education in minimally invasive surgery is commonly based on subjective criteria to quantify and evaluate surgical abilities, which could be potentially unsafe for the patient. Authors, surgeons and associations are increasingly demanding the development of more objective assessment tools that can accredit surgeons as technically competent. This paper describes the state of the art in objective assessment methods of surgical skills. It gives an overview on assessment systems based on structured checklists and rating scales, surgical simulators, and instrument motion analysis. As a future work, an objective and automatic assessment method of surgical skills should be standardized as a means towards proficiency-based curricula for training in laparoscopic surgery and its certification.

  16. 47 CFR 68.604 - Requirements for submitting technical criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Requirements for submitting technical criteria. 68.604 Section 68.604 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER...) may establish technical criteria for terminal equipment pursuant to ANSI consensus decision-making...

  17. 7 CFR 652.21 - Certification criteria and requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... must: (1) Have the required technical training, education, and experience to perform the level of technical assistance for which certification is sought; (2) Meet any applicable professional or business... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL SERVICE PROVIDER ASSISTANCE...

  18. Potential Applications of Modularity to Enable a Deep Space Habitation Capability for Future Human Exploration Beyond Low-Earth Orbit

    NASA Technical Reports Server (NTRS)

    Simon, Matthew A.; Toups, Larry; Smitherman, David

    2012-01-01

    Evaluating preliminary concepts of a Deep Space Habitat (DSH) enabling long duration crewed exploration of asteroids, the Moon, and Mars is a technically challenging problem. Sufficient habitat volumes and equipment, necessary to ensure crew health and functionality, increase propellant requirements and decrease launch flexibility to deliver multiple elements on a single launch vehicle; both of which increase overall mission cost. Applying modularity in the design of the habitat structures and subsystems can alleviate these difficulties by spreading the build-up of the overall habitation capability across several smaller parts. This allows for a more flexible habitation approach that accommodates various crew mission durations and levels of functionality. This paper provides a technical analysis of how various modular habitation approaches can impact the parametric design of a DSH with potential benefits in mass, packaging volume, and architectural flexibility. This includes a description of the desired long duration habitation capability, the definition of a baseline model for comparison, a small trade study to investigate alternatives, and commentary on potentially advantageous configurations to enable different levels of habitability. The approaches investigated include modular pressure vessel strategies, modular subsystems, and modular manufacturing approaches to habitat structure. The paper also comments upon the possibility of an integrated habitation strategy using modular components to create all short and long duration habitation elements required in the current exploration architectures.

  19. Geospatial analysis of near-term potential for carbon-negative bioenergy in the United States

    PubMed Central

    Baik, Ejeong; Turner, Peter A.; Mach, Katharine J.; Field, Christopher B.; Benson, Sally M.

    2018-01-01

    Bioenergy with carbon capture and storage (BECCS) is a negative-emissions technology that may play a crucial role in climate change mitigation. BECCS relies on the capture and sequestration of carbon dioxide (CO2) following bioenergy production to remove and reliably sequester atmospheric CO2. Previous BECCS deployment assessments have largely overlooked the potential lack of spatial colocation of suitable storage basins and biomass availability, in the absence of long-distance biomass and CO2 transport. These conditions could constrain the near-term technical deployment potential of BECCS due to social and economic barriers that exist for biomass and CO2 transport. This study leverages biomass production data and site-specific injection and storage capacity estimates at high spatial resolution to assess the near-term deployment opportunities for BECCS in the United States. If the total biomass resource available in the United States was mobilized for BECCS, an estimated 370 Mt CO2⋅y−1 of negative emissions could be supplied in 2020. However, the absence of long-distance biomass and CO2 transport, as well as limitations imposed by unsuitable regional storage and injection capacities, collectively decrease the technical potential of negative emissions to 100 Mt CO2⋅y−1. Meeting this technical potential may require large-scale deployment of BECCS technology in more than 1,000 counties, as well as widespread deployment of dedicated energy crops. Specifically, the Illinois basin, Gulf region, and western North Dakota have the greatest potential for near-term BECCS deployment. High-resolution spatial assessment as conducted in this study can inform near-term opportunities that minimize social and economic barriers to BECCS deployment. PMID:29531081

  20. Global emissions of fluorinated greenhouse gases until 2050: technical mitigation potentials and costs

    NASA Astrophysics Data System (ADS)

    Purohit, Pallav; Hoglund-Isaksson, Lena

    2016-04-01

    The anthropogenic fluorinated (F-gases) greenhouse gas emissions have increased significantly in recent years and are estimated to rise further in response to increased demand for cooling services and the phase out of ozone-depleting substances (ODS) under the Montreal Protocol. F-gases (HFCs, PFCs and SF6) are potent greenhouse gases, with a global warming effect up to 22,800 times greater than carbon dioxide (CO2). This study presents estimates of current and future global emissions of F-gases, their technical mitigation potential and associated costs for the period 2005 to 2050. The analysis uses the GAINS model framework to estimate emissions, mitigation potentials and costs for all major sources of anthropogenic F-gases for 162 countries/regions, which are aggregated to produce global estimates. For each region, 18 emission source sectors with mitigation potentials and costs were identified. Global F-gas emissions are estimated at 0.7 Gt CO2eq in 2005 with an expected increase to about 3.6 Gt CO2eq in 2050. There are extensive opportunities to reduce emissions by over 95 percent primarily through replacement with existing low GWP substances. The initial results indicate that at least half of the mitigation potential is attainable at a cost of less than 20€ per t CO2eq, while almost 90 percent reduction is attainable at less than 100€ per t CO2eq. Currently, several policy proposals have been presented to amend the Montreal Protocol to substantially curb global HFC use. We analyze the technical potentials and costs associated with the HFC mitigation required under the different proposed Montreal Protocol amendments.

  1. Potential Size of and Value Proposition for H2@Scale Concept

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruth, Mark F; Jadun, Paige; Pivovar, Bryan S

    The H2@Scale concept is focused on developing hydrogen as an energy carrier and using hydrogen's properties to improve the national energy system. Specifically hydrogen has the abilities to (1) supply a clean energy source for industry and transportation and (2) increase the profitability of variable renewable electricity generators such as wind turbines and solar photovoltaic (PV) farms by providing value for otherwise potentially-curtailed electricity. Thus the concept also has the potential to reduce oil dependency by providing a low-carbon fuel for fuel cell electric vehicles (FCEVs), reduce emissions of carbon dioxide and pollutants such as NOx, and support domestic energymore » production, manufacturing, and U.S. economic competitiveness. The analysis reported here focuses on the potential market size and value proposition for the H2@Scale concept. It involves three analysis phases: 1. Initial phase estimating the technical potential for hydrogen markets and the resources required to meet them; 2. National-scale analysis of the economic potential for hydrogen and the interactions between willingness to pay by hydrogen users and the cost to produce hydrogen from various sources; and 3. In-depth analysis of spatial and economic issues impacting hydrogen production and utilization and the markets. Preliminary analysis of the technical potential indicates that the technical potential for hydrogen use is approximately 60 million metric tons (MMT) annually for light duty FCEVs, heavy duty vehicles, ammonia production, oil refining, biofuel hydrotreating, metals refining, and injection into the natural gas system. The technical potential of utility-scale PV and wind generation independently are much greater than that necessary to produce 60 MMT / year hydrogen. Uranium, natural gas, and coal reserves are each sufficient to produce 60 MMT / year hydrogen in addition to their current uses for decades to centuries. National estimates of the economic potential of hydrogen production using steam methane reforming of natural gas, high temperature electrolysis coupled with nuclear power plants, and low temperature electrolysis are reported. To generate the estimates, supply curves for those technologies are used. They are compared to demand curves that describe the market size for hydrogen uses and willingness to pay for that hydrogen. Scenarios are developed at prices where supply meets demand and are used to estimate energy use, emissions, and economic impacts.« less

  2. 48 CFR 209.505-4 - Obtaining access to proprietary information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Non-disclosure requirements for contractors accessing third party proprietary technical data or... may be required to enter into non-disclosure agreements directly with the third party asserting restrictions on limited rights technical data, commercial technical data, or restricted rights computer...

  3. Radio broadcasting via satellite

    NASA Astrophysics Data System (ADS)

    Helm, Neil R.; Pritchard, Wilbur L.

    1990-10-01

    Market areas offering potential for future narrowband broadcast satellites are examined, including international public diplomacy, government- and advertising-supported, and business-application usages. Technical issues such as frequency allocation, spacecraft types, transmission parameters, and radio receiver characteristics are outlined. Service and system requirements, advertising revenue, and business communications services are among the economic issues discussed. The institutional framework required to provide an operational radio broadcast service is studied, and new initiatives in direct broadcast audio radio systems, encompassing studies, tests, in-orbit demonstrations of, and proposals for national and international commercial broadcast services are considered.

  4. Endoscopic, single-catheter treatment of Dandy-Walker syndrome hydrocephalus: technical case report and review of treatment options.

    PubMed

    Sikorski, Christian W; Curry, Daniel J

    2005-01-01

    Optimal treatment for hydrocephalus related to Dandy-Walker syndrome (DWS) remains elusive. Patients with DWS-related hydrocephalus often require combinations of shunting systems to effectively drain both the supratentorial ventricles and posterior fossa cyst. We describe an endoscopic technique, whereby a frontally placed, single-catheter shunting system effectively drained the supratentorial and infratentorial compartments. This reduces the complexity and potential risk associated with the combined shunting systems required by so many with DWS-related hydrocephalus. Copyright 2005 S. Karger AG, Basel.

  5. Shuttle Ground Operations Efficiencies/Technologies Study (SGOE/T). Volume 5: Technical Information Sheets (TIS)

    NASA Technical Reports Server (NTRS)

    Scholz, A. L.; Hart, M. T.; Lowry, D. J.

    1987-01-01

    The Technology Information Sheet was assembled in database format during Phase I. This document was designed to provide a repository for information pertaining to 144 Operations and Maintenance Instructions (OMI) controlled operations in the Orbiter Processing Facility (OPF), Vehicle Assembly Building (VAB), and PAD. It provides a way to accumulate information about required crew sizes, operations task time duration (serial and/or parallel), special Ground Support Equipment (GSE). required, and identification of a potential application of existing technology or the need for the development of a new technolgoy item.

  6. Potential uses of a wireless network in physical security systems.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Witzke, Edward L.

    2010-07-01

    Many possible applications requiring or benefiting from a wireless network are available for bolstering physical security and awareness at high security installations or facilities. These enhancements are not always straightforward and may require careful analysis, selection, tuning, and implementation of wireless technologies. In this paper, an introduction to wireless networks and the task of enhancing physical security is first given. Next, numerous applications of a wireless network are brought forth. The technical issues that arise when using a wireless network to support these applications are then discussed. Finally, a summary is presented.

  7. A technical guide to tDCS, and related non-invasive brain stimulation tools

    PubMed Central

    Woods, AJ; Antal, A; Bikson, M; Boggio, PS; Brunoni, AR; Celnik, P; Cohen, LG; Fregni, F; Herrmann, CS; Kappenman, ES; Knotkova, H; Liebetanz, D; Miniussi, C; Miranda, PC; Paulus, W; Priori, A; Reato, D; Stagg, C; Wenderoth, N; Nitsche, MA

    2015-01-01

    Transcranial electrical stimulation (tES), including transcranial direct and alternating current stimulation (tDCS, tACS) are non-invasive brain stimulation techniques increasingly used for modulation of central nervous system excitability in humans. Here we address methodological issues required for tES application. This review covers technical aspects of tES, as well as applications like exploration of brain physiology, modelling approaches, tES in cognitive neurosciences, and interventional approaches. It aims to help the reader to appropriately design and conduct studies involving these brain stimulation techniques, understand limitations and avoid shortcomings, which might hamper the scientific rigor and potential applications in the clinical domain. PMID:26652115

  8. The French Space Operation Act: Technical Regulations

    NASA Astrophysics Data System (ADS)

    Trinchero, J. P.; Lazare, B.

    2010-09-01

    The French Space Operation Act(FSOA) stipulates that a prime objective of the National technical regulations is to protect people, property, public health and the environment. Compliance with these technical regulations is mandatory as of 10 December 2010 for space operations by French space operators and for space operations from French territory. The space safety requirements and regulations governing procedures are based on national and international best practices and experience. A critical design review of the space system and procedures shall be carried out by the applicant, in order to verify compliance with the Technical Regulations. An independent technical assessment of the operation is delegated to CNES. The principles applied when drafting technical regulations are as follows: requirements must as far as possible establish the rules according to the objective to be obtained, rather than how it is to be achieved; requirements must give preference to international standards recognised as being the state of the art; requirements must take previous experience into account. Technical regulations are divided into three sections covering common requirements for the launch, control and return of a space object. A dedicated section will cover specific rules to be applied at the Guiana Space Centre. The main topics addressed by the technical regulations are: operator safety management system; study of risks to people, property, public health and the Earth’s environment; impact study on the outer space environment: space debris generated by the operation; planetary protection.

  9. DIY Solar Market Analysis Webinar Series: Solar Resource and Technical

    Science.gov Websites

    Series: Solar Resource and Technical Potential DIY Solar Market Analysis Webinar Series: Solar Resource and Technical Potential Wednesday, June 11, 2014 As part of a Do-It-Yourself Solar Market Analysis summer series, NREL's Solar Technical Assistance Team (STAT) presented a live webinar titled, "Solar

  10. In pursuit of our ancestors' hand laterality.

    PubMed

    Bargalló, Amèlia; Mosquera, Marina; Lozano, Sergi

    2017-10-01

    The aim of this paper is to apply a previously published method (Bargalló and Mosquera, 2014) to the archaeological record, allowing us to identify the hand laterality of our ancestors and determine when and how this feature, which is exhibited most strongly in humans, appeared in our evolutionary history. The method focuses on identifying handedness by looking at the technical features of the flakes produced by a single knapper, and discovering how many flakes are required to ascertain their hand preference. This method can potentially be applied to the majority of archaeological sites, since flakes are the most abundant stone tools, and stone tools are the most widespread and widely-preserved remains from prehistory. For our study, we selected two Spanish sites: Gran Dolina-TD10.1 (Atapuerca) and Abric Romaní (Barcelona), which were occupied by pre-Neanderthal and Neanderthal populations, respectively. Our analyses indicate that a minimum number of eight flakes produced by the same knapper is required to ascertain their hand preference. Even though this figure is relatively low, it is quite difficult to obtain from many archaeological sites. In addition, there is no single technical feature that provides information about handedness, instead there is a combination of eight technical features, localised on the striking platforms and ventral surfaces. The raw material is not relevant where good quality rocks are used, in this case quartzite and flint, since most of them retain the technical features required for the analysis. Expertise is not an issue either, since the technical features analysed here only correlate with handedness (Bargalló and Mosquera, 2014). Our results allow us to tentatively identify one right-handed knapper among the pre-Neanderthals of level TD10.1 at Gran Dolina (Atapuerca), while four of the five Neanderthals analysed from Abric Romaní were right-handed. The hand preference of the fifth knapper from that location (AR5) remains unclear. Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. Thrust and parry of the SIOP (single integrated operational plan) and sdi (strategic defense initiative). Research report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zank, G.D.

    1989-05-01

    The relationship between strategic offensive capabilities (reflected in the SIOP) and emerging strategic defensive capabilities (reflected by SDI) is not being adequately addressed. A summary of the existing nuclear war planning process is provided, and an analagous defensive process is postulated. Parallels and differences between the two processes are discussed. Potential areas for information exchange and cooperation are identified to enhance deterrence and improve war fighting potential. Operational, technical and political issues requiring resolution are raised and recommendations to resolve these issues are made.

  12. Proving Ground Potential Mission and Flight Test Objectives and Near Term Architectures

    NASA Technical Reports Server (NTRS)

    Smith, R. Marshall; Craig, Douglas A.; Lopez, Pedro Jr.

    2016-01-01

    NASA is developing a Pioneering Space Strategy to expand human and robotic presence further into the solar system, not just to explore and visit, but to stay. NASA's strategy is designed to meet technical and non-technical challenges, leverage current and near-term activities, and lead to a future where humans can work, learn, operate, and thrive safely in space for an extended, and eventually indefinite, period of time. An important aspect of this strategy is the implementation of proving ground activities needed to ensure confidence in both Mars systems and deep space operations prior to embarking on the journey to the Mars. As part of the proving ground development, NASA is assessing potential mission concepts that could validate the required capabilities needed to expand human presence into the solar system. The first step identified in the proving ground is to establish human presence in the cis-lunar vicinity to enable development and testing of systems and operations required to land humans on Mars and to reach other deep space destinations. These capabilities may also be leveraged to support potential commercial and international objectives for Lunar Surface missions. This paper will discuss a series of potential proving ground mission and flight test objectives that support NASA's journey to Mars and can be leveraged for commercial and international goals. The paper will discuss how early missions will begin to satisfy these objectives, including extensibility and applicability to Mars. The initial capability provided by the launch vehicle will be described as well as planned upgrades required to support longer and more complex missions. Potential architectures and mission concepts will be examined as options to satisfy proving ground objectives. In addition, these architectures will be assessed on commercial and international participation opportunities and on how well they develop capabilities and operations applicable to Mars vicinity missions.

  13. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  14. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 2 2014-07-01 2014-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  15. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 2 2013-07-01 2013-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  16. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 2 2011-07-01 2011-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  17. 32 CFR 203.17 - Technical assistance provider reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 2 2012-07-01 2012-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...

  18. Antenna Electronics Concept for the Next-Generation Very Large Array

    NASA Astrophysics Data System (ADS)

    Beasley, Anthony J.; Jackson, Jim; Selina, Robert

    2017-01-01

    The National Radio Astronomy Observatory (NRAO), in collaboration with its international partners, completed two major projects over the past decade: the sensitivity upgrade for the Karl Jansky Very Large Array (VLA) and the construction of the Atacama Large Millimeter/Sub-Millimeter Array (ALMA). The NRAO is now considering the scientific potential and technical feasibility of a next-generation VLA (ngVLA) with an emphasis on thermal imaging at milli-arcsecond resolution. The preliminary goals for the ngVLA are to increase both the system sensitivity and angular resolution of the VLA tenfold and to cover a frequency range of 1.2-116 GHz.A number of key technical challenges have been identified for the project. These include cost-effective antenna manufacturing (in the hundreds), suitable wide-band feed and receiver designs, broad-band data transmission, and large-N correlators. Minimizing the overall operations cost is also a fundamental design requirement.The designs of the antenna electronics, reference distribution system, and data transmission system are anticipated to be major construction and operations cost drivers for the facility. The electronics must achieve a high level of performance, while maintaining low operation and maintenance costs and a high level of reliability. Additionally, due to the uncertainty in the feasibility of wideband receivers, advancements in digitizer technology, and budget constraints, the hardware system architecture should be scalable to the number of receiver bands and the speed and resolution of available digitizers.Here, we present the projected performance requirements of the ngVLA, a proposed block diagram for the instrument’s electronics systems, parameter tradeoffs within the system specifications, and areas of technical risk where technical advances may be required for successful production and installation.

  19. 47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...

  20. 47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...

  1. 47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...

  2. 47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...

  3. 47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...

  4. 77 FR 20406 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-D-0288] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal... been developed for veterinary use by the International Cooperation on Harmonisation of Technical...

  5. HNSciCloud - Overview and technical Challenges

    NASA Astrophysics Data System (ADS)

    Gasthuber, Martin; Meinhard, Helge; Jones, Robert

    2017-10-01

    HEP is only one of many sciences with sharply increasing compute requirements that cannot be met by profiting from Moore’s law alone. Commercial clouds potentially allow for realising larger economies of scale. While some small-scale experience requiring dedicated effort has been collected, public cloud resources have not been integrated yet with the standard workflows of science organisations in their private data centres; in addition, European science has not ramped up to significant scale yet. The HELIX NEBULA Science Cloud project - HNSciCloud, partly funded by the European Commission, addresses these points. Ten organisations under CERN’s leadership, covering particle physics, bioinformatics, photon science and other sciences, have joined to procure public cloud resources as well as dedicated development efforts towards this integration. The HNSciCloud project faces the challenge to accelerate developments performed by the selected commercial providers. In order to guarantee cost efficient usage of IaaS resources across a wide range of scientific communities, the technical requirements had to be carefully constructed. With respect to current IaaS offerings, dataintensive science is the biggest challenge; other points that need to be addressed concern identity federations, network connectivity and how to match business practices of large IaaS providers with those of public research organisations. In the first section, this paper will give an overview of the project and explain the findings so far. The last section will explain the key points of the technical requirements and present first results of the experience of the procurers with the services in comparison to their’on-premise’ infrastructure.

  6. Training NOAA Staff on Effective Communication Methods with Local Climate Users

    NASA Astrophysics Data System (ADS)

    Timofeyeva, M. M.; Mayes, B.

    2011-12-01

    Since 2002 NOAA National Weather Service (NWS) Climate Services Division (CSD) offered training opportunities to NWS staff. As a result of eight-year-long development of the training program, NWS offers three training courses and about 25 online distance learning modules covering various climate topics: climate data and observations, climate variability and change, NWS national and local climate products, their tools, skill, and interpretation. Leveraging climate information and expertise available at all NOAA line offices and partners allows delivery of the most advanced knowledge and is a very critical aspect of the training program. NWS challenges in providing local climate services includes effective communication techniques on provide highly technical scientific information to local users. Addressing this challenge requires well trained, climate-literate workforce at local level capable of communicating the NOAA climate products and services as well as provide climate-sensitive decision support. Trained NWS climate service personnel use proactive and reactive approaches and professional education methods in communicating climate variability and change information to local users. Both scientifically-unimpaired messages and amiable communication techniques such as story telling approach are important in developing an engaged dialog between the climate service providers and users. Several pilot projects NWS CSD conducted in the past year applied the NWS climate services training program to training events for NOAA technical user groups. The technical user groups included natural resources managers, engineers, hydrologists, and planners for transportation infrastructure. Training of professional user groups required tailoring the instructions to the potential applications of each group of users. Training technical user identified the following critical issues: (1) Knowledge of target audience expectations, initial knowledge status, and potential use of climate information; (2) Leveraging partnership with climate services providers; and, (3) Applying 3H training approach, where the first H stands for Head (trusted science), the second H stands for Heart (make it easy), and the third H for Hand (support with applications).

  7. INDOT Technical Training Plan : [Technical Summary

    DOT National Transportation Integrated Search

    2012-01-01

    A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...

  8. 76 FR 35103 - Training and Qualification Requirements for Check Airmen and Flight Instructors; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... which initial and transition flight training must include an in-flight element. Technical Amendment This.... 28471; Amendment Nos. 121-355 and 135-125] RIN 2120-AF08 Training and Qualification Requirements for Check Airmen and Flight Instructors; Technical Amendment AGENCY: Federal Aviation Administration (FAA...

  9. 44 CFR 65.3 - Requirement to submit new technical data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... technical data. 65.3 Section 65.3 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.3 Requirement to submit new technical data. A community's base flood elevations may increase or decrease resulting from physical changes affecting flooding...

  10. 22 CFR 125.6 - Certification requirements for exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert...

  11. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for containers by design...

  12. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for containers by design...

  13. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for containers by design...

  14. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for containers by design...

  15. 19 CFR 115.30 - Technical requirements for containers by design type.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for containers by design...

  16. 47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...

  17. 47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...

  18. 47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...

  19. 47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...

  20. 22 CFR 125.6 - Certification requirements for exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...

  1. 22 CFR 125.6 - Certification requirements for exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    .... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...

  2. 22 CFR 125.6 - Certification requirements for exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    .... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...

  3. 22 CFR 125.6 - Certification requirements for exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    .... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...

  4. 76 FR 35231 - Notice of Proposed Information Collection for Public Comment; McKinney-Vento Technical Assistance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... Information Collection for Public Comment; McKinney-Vento Technical Assistance Narrative, Matrices, and... Narrative, Matrices, and Reporting Requirements. Description of the need for the information proposed: McKinney- Vento Technical Assistance (MV-TA) Narrative, Matrices, and Reporting Requirements will allow the...

  5. Generating end plug potentials in tandem mirror plasma confinement by heating thermal particles so as to escape low density end stoppering plasmas

    DOEpatents

    Baldwin, D.E.; Logan, B.G.

    The invention provides a method and apparatus for raising the potential of a magnetic mirror cell by pumping charged particles of the opposite sign of the potential desired out of the mirror cell through excitation, with the pumping being done by an externally imposed field at the bounce frequence of the above charged particles. These pumped simple mirror cells then provide end stoppering for a center mirror cell for the tandem mirror plasma confinement apparatus. For the substantially complete pumping case, the end plugs of a tandem mirror can be up to two orders of magnitude lower in density for confining a given center mirror cell plasma than in the case of end plugs without pumping. As a result the decrease in recirculating power required to keep the system going, the technical state of the art required, and the capital cost are all greatly lowered.

  6. Technical Excellence: A Requirement for Good Engineering

    NASA Technical Reports Server (NTRS)

    Gill, Paul S.; Vaughan, William W.

    2008-01-01

    Technical excellence is a requirement for good engineering. Technical excellence has many different ways of expressing itself within engineering. NASA has initiatives that address the enhancement of the Agency's technical excellence and thrust to maintain the associated high level of performance by the Agency on current programs/projects and as it moves into the Constellation Program and the return to the Moon with plans to visit Mars. This paper addresses some of the key initiatives associated with NASA's technical excellence thrust. Examples are provided to illustrate some results being achieved and plans to enhance these initiatives.

  7. Beyond xMOOCs in healthcare education: study of the feasibility in integrating virtual patient systems and MOOC platforms.

    PubMed

    Stathakarou, Natalia; Zary, Nabil; Kononowicz, Andrzej A

    2014-01-01

    Background. Massive Open Online Courses (MOOCs) are an emerging trend in online learning. However, their technology is not yet completely adjusted to the needs of healthcare education. Integration of Virtual Patients within MOOCs to increase interactivity and foster clinical reasoning skills training, has been discussed in the past, but not verified by a practical implementation. Objective. To investigate the technical feasibility of integrating MOOCs with Virtual Patients for the purpose of enabling further research into the potential pedagogical benefits of this approach. Methods. We selected OpenEdx and Open Labyrinth as representative constituents of a MOOC platform and Virtual Patient system integration. Based upon our prior experience we selected the most fundamental technical requirement to address. Grounded in the available literature we identified an e-learning standard to guide the integration. We attempted to demonstrate the feasibility of the integration by designing a "proof-of-concept" prototype. The resulting pilot implementation was subject of verification by two test cases. Results. A Single Sign-On mechanism connecting Open Labyrinth with OpenEdx and based on the IMS LTI standard was successfully implemented and verified. Conclusion. We investigated the technical perspective of integrating Virtual Patients with MOOCs. By addressing this crucial technical requirement we set a base for future research on the educational benefits of using virtual patients in MOOCs. This provides new opportunities for integrating specialized software in healthcare education at massive scale.

  8. Beyond xMOOCs in healthcare education: study of the feasibility in integrating virtual patient systems and MOOC platforms

    PubMed Central

    Zary, Nabil; Kononowicz, Andrzej A.

    2014-01-01

    Background. Massive Open Online Courses (MOOCs) are an emerging trend in online learning. However, their technology is not yet completely adjusted to the needs of healthcare education. Integration of Virtual Patients within MOOCs to increase interactivity and foster clinical reasoning skills training, has been discussed in the past, but not verified by a practical implementation. Objective. To investigate the technical feasibility of integrating MOOCs with Virtual Patients for the purpose of enabling further research into the potential pedagogical benefits of this approach. Methods. We selected OpenEdx and Open Labyrinth as representative constituents of a MOOC platform and Virtual Patient system integration. Based upon our prior experience we selected the most fundamental technical requirement to address. Grounded in the available literature we identified an e-learning standard to guide the integration. We attempted to demonstrate the feasibility of the integration by designing a “proof-of-concept” prototype. The resulting pilot implementation was subject of verification by two test cases. Results. A Single Sign-On mechanism connecting Open Labyrinth with OpenEdx and based on the IMS LTI standard was successfully implemented and verified. Conclusion. We investigated the technical perspective of integrating Virtual Patients with MOOCs. By addressing this crucial technical requirement we set a base for future research on the educational benefits of using virtual patients in MOOCs. This provides new opportunities for integrating specialized software in healthcare education at massive scale. PMID:25405078

  9. A Multi-User Model for Effectively Communicating Research Through Electronic Media

    NASA Astrophysics Data System (ADS)

    Hinds, J. J.; Fairley, J. P.

    2003-12-01

    Electronic media have demonstrated potential for data exchange, dissemination of results to other scientists, communication with community interest groups, and education of the general public regarding scientific advances. Few researchers, however, receive training in the skills required to capture the attention of the broad spectrum of Internet users. Because different people assimilate information in different ways, effective communication is best accomplished using an appropriate mix of photographs, graphics, tables, and text. In addition, effective web page design requires a clear, consistent organizational structure, easily-navigated layout, and attention to details such as page printability, downloading time, and minimal page scrolling. One of the strengths of electronic media is that the user can chose an appropriate level of involvement for his or her interest. In designing a web page for the multidisciplinary NSF/EPSCoR "Biocomplexity in Extreme Environments" project, we divided potential users into three categories based on our perception of the level of detail they required: 1) project participants, 2) non-participants with technical backgrounds, and 3) the general public. By understanding the needs and expectations of potential viewers, it was possible to present each group with an appropriate balance of visual and textural elements. For example, project participants are often most interested in raw data, which can be effectively presented in tabular format. Non-participants with technical backgrounds are more interested in analyzed data, while a project overview, presented through photographs and graphics with minimal text, will be most effective for communicating with the general public. The completed web page illustrates one solution for effectively communicating with a diverse audience, and provides examples for meeting many of the challenges of web page design.

  10. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less

  11. Reaching a 1.5°C target: socio-technical challenges for a rapid transition to low-carbon electricity systems.

    PubMed

    Eyre, Nick; Darby, Sarah J; Grünewald, Philipp; McKenna, Eoghan; Ford, Rebecca

    2018-05-13

    A 1.5°C global average target implies that we should no longer focus on merely incremental emissions reductions from the electricity system, but rather on fundamentally re-envisaging a system that, sooner rather than later, becomes carbon free. Many low-carbon technologies are surpassing mainstream predictions for both uptake and cost reduction. Their deployment is beginning to be disruptive within established systems. 'Smart technologies' are being developed to address emerging challenges of system integration, but their rates of future deployment remain uncertain. We argue that transition towards a system that can fully displace carbon generation sources will require expanding the focus of our efforts beyond technical solutions. Recognizing that change has social and technical dimensions, and that these interact strongly, we set out a socio-technical review that covers electricity infrastructure, citizens, business models and governance. It describes some of the socio-technical challenges that need to be addressed for the successful transition of the existing electricity systems. We conclude that a socio-technical understanding of electricity system transitions offers new and better insights into the potential and challenges for rapid decarbonization.This article is part of the theme issue 'The Paris Agreement: understanding the physical and social challenges for a warming world of 1.5°C above pre-industrial levels'. © 2018 The Author(s).

  12. 20 CFR 411.180 - What is timely progress toward self-supporting employment?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... certificate or vocational or technical training that will enhance your ability to return to work. In addition...-secondary education requirement or vocational or technical training requirement in the applicable progress... this 12-month period; or (iv) You must have been enrolled in a vocational or technical training program...

  13. 15 CFR 14.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., record of past performance, financial and technical resources or accessibility to other necessary... practicable, of technical requirements in terms of functions to be performed or performance required...

  14. Space Station Workshop: Commercial Missions and User Requirements

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The topics of discussion addressed during a three day workshop on commercial application in space are presented. Approximately half of the program was directed towards an overview and orientation to the Space Station Project; the technical attributes of space; and present and future potential commercial opportunities. The remaining time was spent addressing technological issues presented by previously-formed industry working groups, who attempted to identify the technology needs, problems or issues faced and/or anticipated by the following industries: extraction (mining, agriculture, petroleum, fishing, etc.); fabrication (manufacturing, automotive, aircraft, chemical, pharmaceutical and electronics); and services (communications, transportation and retail robotics). After the industry groups presented their technology issues, the workshop divided into smaller discussion groups composed of: space experts from NASA; academia; industry experts in the appropriate disciplines; and other workshop participants. The needs identified by the industry working groups, space station technical requirements, proposed commercial ventures and other issues related to space commercialization were discussed. The material summarized and reported are the consensus from the discussion groups.

  15. Monitored Geologic Repository Project Description Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    P. M. Curry

    2001-01-30

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing formore » the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6).« less

  16. Mission Critical Computer Resources Management Guide.

    DTIC Science & Technology

    1990-01-01

    another task and Ada fixes priorities at con- ported. The goal of the early developers of pilation time and is therefore inflexible to thc Ada was to...may support thc use of computer stitute are investigating the technical and aided design and manufacturing management advances required to answer (CAD...the Commerce Business Daily ( CBD ). intended, and special contract clauses to be It will be used by procurement personnel to used. determine potential

  17. Effects of Stress on Judgment and Decision Making in Dynamic Tasks

    DTIC Science & Technology

    1991-06-01

    their normal working conditions, (2) to ascertain whether the results from lens model theory and research in static tasks generalize to these...8217 normal work environment. A further generalization from lens model theory is that those precursors (secondary cues) that are more conceptual in...potential microburst cases. Although this sample of cases is admittedly smaller than desirable, many hours of technical work were required to remove

  18. Using Transgenic Zebrafish to Study Muscle Stem/Progenitor Cells.

    PubMed

    Nguyen, Phong D; Currie, Peter D

    2017-01-01

    Understanding muscle stem cell behaviors can potentially provide insights into how these cells act and respond during normal growth and diseased contexts. The zebrafish is an ideal model organism to examine these behaviors in vivo where it would normally be technically challenging in other mammalian models. This chapter will describe the procedures required to successfully conduct live imaging of zebrafish transgenics that has specifically been adapted for skeletal muscle.

  19. Tityus serrulatus Scorpion Venom: In Vitro Tests and Their Correlation with In Vivo Lethal Dose Assay

    PubMed Central

    Cajado-Carvalho, Daniela; Galvão, Juliana; Kuniyoshi, Alexandre K.; Carneiro, Patrícia dos Santos; Paes Leme, Adriana Franco; Pauletti, Bianca Alves; Marengo, Eliana Blini; Portaro, Fernanda V.

    2017-01-01

    Scorpion stings are the main cause of human envenomation in Brazil and, for the treatment of victims, the World Health Organization (WHO) recommends the use of antivenoms. The first step to achieve effective antivenom is to use a good quality venom pool and to evaluate it, with LD50 determination as the most accepted procedure. It is, however, time-consuming and requires advanced technical training. Further, there are significant ethical concerns regarding the number of animals required for testing. Hence, we investigated the correspondence between LD50 results, in vitro assays, and a strong correlation with proteolytic activity levels was observed, showing, remarkably, that proteases are potential toxicity markers for Tityus serrulatus venom. The comparison of reversed-phase chromatographic profiles also has a potential application in venoms’ quality control, as there were fewer neurotoxins detected in the venom with high LD50 value. These results were confirmed by mass spectrometry analysis. Therefore, these methods could precede the LD50 assay to evaluate the venom excellence by discriminating—and discarding—poor-quality batches, and, consequently, with a positive impact on the number of animals used. Notably, proposed assays are fast and inexpensive, being technically and economically feasible in Tityus serrulatus venom quality control to produce effective antivenoms. PMID:29168766

  20. A technical guide to tDCS, and related non-invasive brain stimulation tools.

    PubMed

    Woods, A J; Antal, A; Bikson, M; Boggio, P S; Brunoni, A R; Celnik, P; Cohen, L G; Fregni, F; Herrmann, C S; Kappenman, E S; Knotkova, H; Liebetanz, D; Miniussi, C; Miranda, P C; Paulus, W; Priori, A; Reato, D; Stagg, C; Wenderoth, N; Nitsche, M A

    2016-02-01

    Transcranial electrical stimulation (tES), including transcranial direct and alternating current stimulation (tDCS, tACS) are non-invasive brain stimulation techniques increasingly used for modulation of central nervous system excitability in humans. Here we address methodological issues required for tES application. This review covers technical aspects of tES, as well as applications like exploration of brain physiology, modelling approaches, tES in cognitive neurosciences, and interventional approaches. It aims to help the reader to appropriately design and conduct studies involving these brain stimulation techniques, understand limitations and avoid shortcomings, which might hamper the scientific rigor and potential applications in the clinical domain. Copyright © 2015 International Federation of Clinical Neurophysiology. All rights reserved.

  1. Geospatial Analysis | Energy Analysis | NREL

    Science.gov Websites

    products and tools. Image of a triangle divided into sections called Market, Economic, Technical, and Featured Study U.S. Renewable Energy Technical Potentials: A GIS-Based Analysis summarizes the achievable energy generation, or technical potential, of specific renewable energy technologies given system

  2. Project SAGE: solar assisted gas energy. Final report and executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less

  3. Feasibility Study to Identify Potential Reductions in Energy Use in Tribal Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stevens, Willie

    Under this project, the Confederated Salish and Kootenai Tribes (CSKT) assessed the technical and economic feasibility of energy efficiency improvements to existing Tribally-owned buildings. The feasibility study followed a systematic approach in identifying, selecting, and ranking recommended measures, recognizing that the appropriateness of a measure would depend not only on technical issues but also on institutional and organizational issues, such as financing options and occupant requirements. The completed study provided the Tribes with the information needed to commit necessary resources to reduce the energy use and cost in approximately 40 Tribal buildings, including the changes that may be needed inmore » each facility’s operation and maintenance and personnel requirements. It also presented an economic analysis of energy-efficiency capital improvements and an annotated list of financing options and possible funding sources for implementation and an overall strategy for implementation. This project was located in various Tribal communities located throughout the Flathead Indian Reservation in Western Montana. Notice: The following is a compilation of Annual Program Review Presentations, Award Modifications, and Quarterly Progress Reports submitted to the Department of Energy’s (DOE) Office of Indian Energy Policy and Programs by the Confederated Salish and Kootenai Tribes under agreement DE-EE0005171. This report covers project activities from September 30, 2011 through December 31, 2014 and has been uploaded to OSTI by DOE as a substitute for the required Final Technical Report which was not received by DOE from the project recipient.« less

  4. RELEASE OF DRIED RADIOACTIVE WASTE MATERIALS TECHNICAL BASIS DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    KOZLOWSKI, S.D.

    2007-05-30

    This technical basis document was developed to support RPP-23429, Preliminary Documented Safety Analysis for the Demonstration Bulk Vitrification System (PDSA) and RPP-23479, Preliminary Documented Safety Analysis for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Facility. The main document describes the risk binning process and the technical basis for assigning risk bins to the representative accidents involving the release of dried radioactive waste materials from the Demonstration Bulk Vitrification System (DBVS) and to the associated represented hazardous conditions. Appendices D through F provide the technical basis for assigning risk bins to the representative dried waste release accident and associated represented hazardous conditionsmore » for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Packaging Unit (WPU). The risk binning process uses an evaluation of the frequency and consequence of a given representative accident or represented hazardous condition to determine the need for safety structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls. A representative accident or a represented hazardous condition is assigned to a risk bin based on the potential radiological and toxicological consequences to the public and the collocated worker. Note that the risk binning process is not applied to facility workers because credible hazardous conditions with the potential for significant facility worker consequences are considered for safety-significant SSCs and/or TSR-level controls regardless of their estimated frequency. The controls for protection of the facility workers are described in RPP-23429 and RPP-23479. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses, as described below.« less

  5. Carbon-14 bioassay for decommissioning of Hanford reactors.

    PubMed

    Carbaugh, Eugene H; Watson, David J

    2012-05-01

    The production reactors at the U.S. Department of Energy Hanford Site used large graphite piles as the moderator. As part of long-term decommissioning plans, the potential need for ¹⁴C radiobioassay of workers was identified. Technical issues associated with ¹⁴C bioassay and worker monitoring were investigated, including anticipated graphite characterization, potential intake scenarios, and the bioassay capabilities that may be required to support the decommissioning of the graphite piles. A combination of urine and feces sampling would likely be required for the absorption type S ¹⁴C anticipated to be encountered. However, the concentrations in the graphite piles appear to be sufficiently low that dosimetrically significant intakes of ¹⁴C are not credible, thus rendering moot the need for such bioassay.

  6. Carbon-14 Bioassay for Decommissioning of Hanford Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carbaugh, Eugene H.; Watson, David J.

    2012-05-01

    The old production reactors at the US Department of Energy Hanford Site used large graphite piles as the moderator. As part of long-term decommissioning plans, the potential need for 14C radiobioassay of workers was identified. Technical issues associated with 14C bioassay and worker monitoring were investigated, including anticipated graphite characterization, potential intake scenarios, and the bioassay capabilities that may be required to support the decommissioning of the graphite piles. A combination of urine and feces sampling would likely be required for the absorption type S 14C anticipated to be encountered. However the concentrations in the graphite piles appear to bemore » sufficiently low that dosimetrically significant intakes of 14C are not credible, thus rendering moot the need for such bioassay.« less

  7. Analysis of the Parameters Required for Performance Monitoring and Assessment of Military Communications Systems by Military Technical Controller

    DTIC Science & Technology

    1975-12-01

    139 APPENDIX A* BASIC CONCEPT OF MILITARY TECHNICAL CONTROL.142 6 APIENDIX Es TEST EQUIPMENI REQUIRED FOR lEASURF.4ENr OF 1AF’AMETE RS...Control ( SATEC ) Automatic Facilities heport Army Automated Quality Monitoring Reporting System (AQMPS) Army Autcmated Technical Control-Semi (ATC-Semi...technical control then beco.. es equipment status monitoring. All the major equipment in a system wculd have internal sensors with properly selected parameters

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wassom, J.S.; Lu, P.Y.

    Society today is faced with new health risk situations that have been brought about by recent scientific and technical advances. Federal and state governments are required to assess the many potential health risks to exposed populations from the products (chemicals) and by-products (pollutants) of these advances. Because a sound analysis of any potential health risk should be based on the use of relevant information, it behooves those individuals responsible for making the risk assessments to know where to obtain needed information. This paper reviews the origins of toxicology information systems and explores the specialized information center concept that was proposedmore » in 1963 as a means of providing ready access to scientific and technical information. As a means of illustrating this concept, the operation of one specialized information center (the Environmental Mutagen Information Center at Oak Ridge National Laboratory) will be discussed. Insights into how toxicological information resources came into being, their design and makeup, will be of value to those seeking to acquire information for risk assessment purposes. 7 refs., 1 fig., 4 tabs.« less

  9. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stoessel, Chris

    2013-11-13

    This project developed a new high-performance R-10/high SHGC window design, reviewed market positioning and evaluated manufacturing solutions required for broad market adoption. The project objectives were accomplished by: identifying viable technical solutions based on modeling of modern and potential coating stacks and IGU designs; development of new coating material sets for HM thin film stacks, as well as improved HM IGU designs to accept multiple layers of HM films; matching promising new coating designs with new HM IGU designs to demonstrate performance gains; and, in cooperation with a window manufacturer, assess the potential for high-volume manufacturing and cost efficiency ofmore » a HM-based R-10 window with improved solar heat gain characteristics. A broad view of available materials and design options was applied to achieve the desired improvements. Gated engineering methodologies were employed to guide the development process from concept generation to a window demonstration. The project determined that a slightly de-rated window performance allows formulation of a path to achieve the desired cost reductions to support end consumer adoption.« less

  10. Single molecule tools for enzymology, structural biology, systems biology and nanotechnology: an update

    PubMed Central

    Widom, Julia R.; Dhakal, Soma; Heinicke, Laurie A.; Walter, Nils G.

    2015-01-01

    Toxicology is the highly interdisciplinary field studying the adverse effects of chemicals on living organisms. It requires sensitive tools to detect such effects. After their initial implementation during the 1990s, single-molecule fluorescence detection tools were quickly recognized for their potential to contribute greatly to many different areas of scientific inquiry. In the intervening time, technical advances in the field have generated ever-improving spatial and temporal resolution, and have enabled the application of single-molecule fluorescence to increasingly complex systems, such as live cells. In this review, we give an overview of the optical components necessary to implement the most common versions of single-molecule fluorescence detection. We then discuss current applications to enzymology and structural studies, systems biology, and nanotechnology, presenting the technical considerations that are unique to each area of study, along with noteworthy recent results. We also highlight future directions that have the potential to revolutionize these areas of study by further exploiting the capabilities of single-molecule fluorescence microscopy. PMID:25212907

  11. Technical assessment of maglev system concepts. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lever, J.H.

    1998-10-01

    The Government Maglev System Assessment Team operated from 1991 to 1993 as part of the National Maglev Initiative. They assessed the technical viability of four US Maglev system concepts, using the French TGV high speed train and the German TR07 Maglev system as assessment baselines. Maglev in general offers advantages that include high speed potential, excellent system control, high capacity, low energy consumption, low maintenance, modest land requirements, low operating costs, and ability to meet a variety of transportation missions. Further, the US Maglev concepts could provide superior performance to TR07 for similar cost or similar performance for less cost.more » They also could achieve both lower trip times and lower energy consumption along typical US routes. These advantages result generally from the use of large gap magnetic suspensions, more powerful linear synchronous motors and tilting vehicles. Innovative concepts for motors, guideways, suspension, and superconducting magnets all contribute to a potential for superior long term performance of US Maglev systems compared with TGV and TR07.« less

  12. SU-E-CAMPUS-J-04: Image Guided Radiation Therapy (IGRT): Review of Technical Standards and Credentialing in Radiotherapy Clinical Trials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giaddui, T; Chen, W; Yu, J

    2014-06-15

    Purpose: To review IGRT credentialing experience and unexpected technical issues encountered in connection with advanced radiotherapy technologies as implemented in RTOG clinical trials. To update IGRT credentialing procedures with the aim of improving the quality of the process, and to increase the proportion of IGRT credentialing compliance. To develop a living disease site-specific IGRT encyclopedia. Methods: Numerous technical issues were encountered during the IGRT credentialing process. The criteria used for credentialing review were based on: image quality; anatomy included in fused data sets and shift results. Credentialing requirements have been updated according to the AAPM task group reports for IGRTmore » to ensure that all required technical items are included in the quality review process. Implementation instructions have been updated and expanded for recent protocols. Results: Technical issues observed during the credentialing review process include, but are not limited to: poor quality images; inadequate image acquisition region; poor data quality; shifts larger than acceptable; no soft tissue surrogate. The updated IGRT credentialing process will address these issues and will also include the technical items required from AAPM: TG 104; TG 142 and TG 179 reports. An instruction manual has been developed describing a remote credentialing method for reviewers. Submission requirements are updated, including images/documents as well as facility questionnaire. The review report now includes summary of the review process and the parameters that reviewers check. We have reached consensus on the minimum IGRT technical requirement for a number of disease sites. RTOG 1311(NRG-BR002A Phase 1 Study of Stereotactic Body Radiotherapy (SBRT) for the Treatment of Multiple Metastases) is an example, here; the protocol specified the minimum requirement for each anatomical sites (with/without fiducials). Conclusion: Technical issues are identified and reported. IGRT guidelines are updated, with the corresponding credentialing requirements. An IGRT encyclopedia describing site-specific implementation issues is currently in development.« less

  13. Earth-orbit mission considerations and Space Tug requirements.

    NASA Technical Reports Server (NTRS)

    Huber, W. G.

    1973-01-01

    The reusable Space Tug is a major system planned to augment the Space Shuttle's capability to deliver, retrieve, and support automated payloads. The Space Tug will be designed to perform round-trip missions from low earth orbit to geosynchronous orbit. Space Tug goals and requirements are discussed together with the characteristics of the full capability Tug. The Tug is to be operated in an unmanned 'teleoperator' fashion. Details of potential teleoperator applications are considered, giving attention to related systems studies, candidate Tug mission applications, Tug 'end-effector' alternatives, technical issues associated with Tug payload retrieval, and Tug/payload accommodations.

  14. 45 CFR 2543.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., record of past performance, financial and technical resources or accessibility to other necessary... technical requirements in terms of functions to be performed or performance required, including the range of...

  15. 36 CFR 1210.44 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., record of past performance, financial and technical resources or accessibility to other necessary... technical requirements in terms of functions to be performed or performance required, including the range of...

  16. 14 CFR 1260.144 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., record of past performance, financial and technical resources or accessibility to other necessary... technical requirements in terms of functions to be performed or performance required, including the range of...

  17. Functions and requirements document for interim store solidified high-level and transuranic waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith-Fewell, M.A., Westinghouse Hanford

    1996-05-17

    The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture,more » and interfaces.« less

  18. Range Flight Safety Requirements

    NASA Technical Reports Server (NTRS)

    Loftin, Charles E.; Hudson, Sandra M.

    2018-01-01

    The purpose of this NASA Technical Standard is to provide the technical requirements for the NPR 8715.5, Range Flight Safety Program, in regards to protection of the public, the NASA workforce, and property as it pertains to risk analysis, Flight Safety Systems (FSS), and range flight operations. This standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers, and may be cited in contract, program, and other Agency documents as a technical requirement. This standard may also apply to the Jet Propulsion Laboratory or to other contractors, grant recipients, or parties to agreements to the extent specified or referenced in their contracts, grants, or agreements, when these organizations conduct or participate in missions that involve range flight operations as defined by NPR 8715.5.1.2.2 In this standard, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.”1.3 TailoringTailoring of this standard for application to a specific program or project shall be formally documented as part of program or project requirements and approved by the responsible Technical Authority in accordance with NPR 8715.3, NASA General Safety Program Requirements.

  19. Defining Requirements and Related Methods for Designing Sensorized Garments.

    PubMed

    Andreoni, Giuseppe; Standoli, Carlo Emilio; Perego, Paolo

    2016-05-26

    Designing smart garments has strong interdisciplinary implications, specifically related to user and technical requirements, but also because of the very different applications they have: medicine, sport and fitness, lifestyle monitoring, workplace and job conditions analysis, etc. This paper aims to discuss some user, textile, and technical issues to be faced in sensorized clothes development. In relation to the user, the main requirements are anthropometric, gender-related, and aesthetical. In terms of these requirements, the user's age, the target application, and fashion trends cannot be ignored, because they determine the compliance with the wearable system. Regarding textile requirements, functional factors-also influencing user comfort-are elasticity and washability, while more technical properties are the stability of the chemical agents' effects for preserving the sensors' efficacy and reliability, and assuring the proper duration of the product for the complete life cycle. From the technical side, the physiological issues are the most important: skin conductance, tolerance, irritation, and the effect of sweat and perspiration are key factors for reliable sensing. Other technical features such as battery size and duration, and the form factor of the sensor collector, should be considered, as they affect aesthetical requirements, which have proven to be crucial, as well as comfort and wearability.

  20. Overcoming Resistance to New Ideas

    ERIC Educational Resources Information Center

    Powell, William; Kusuma-Powell, Ochan

    2015-01-01

    There are two types of challenges that adults face in their professional learning: technical and adaptive. Technical challenges simply require informational learning while adaptive challenges require transformational learning, which requires us to rethink our deeply held values, beliefs, assumptions, and even our professional identity. Adaptive…

  1. 1988 Underground Storage Tanks; Technical Requirements; Final Rule and Underground Storage Tanks Containing Petroleum-Financial Responsibility Requirements and State Program Approval Objective; Final Rule

    EPA Pesticide Factsheets

    EPA's 1988 regulations concerning USTs are contained in 40 CFR Part 280, 40 CFR Part 281 and 40 CFR Parts 282.50-282.105 and divided into three sections: technical requirements, financial responsibility requirements, and state program approval objectives.

  2. Evaluating the technical feasibility of aflatoxin risk reduction strategies in Africa.

    PubMed

    Wu, Felicia; Khlangwiset, Pornsri

    2010-05-01

    Public health interventions must be readily accepted by their target populations to have any meaningful impact and must have financial and infrastructural support to be feasible in the parts of the world where they are most needed. At the same time, these interventions must be assessed for potential unintended consequences, either to the environment or to human health. In this paper, we evaluate the technical feasibility of interventions to control aflatoxin risk, to be potentially deployed in parts of Africa where aflatoxin exposure poses a significant public health concern. We have applied a conceptual framework for feasibility to four interventions, one associated with each of four different stages of aflatoxin risk: biocontrol (pre-harvest), a post-harvest intervention package (post-harvest), NovaSil clay (dietary), and hepatitis B vaccination (clinical). For each intervention, we have assessed the following four components of technical feasibility: (1) characteristics of the basic intervention, (2) characteristics of delivery, (3) requirements on government capacity, and (4) usage characteristics. We propose ways in which feasibility of each intervention is currently high or low from the perspective of adoption in Africa, how public education is crucial for each of these interventions to succeed, and how to align economic incentives to make the interventions more suitable for less developed countries.

  3. Evaluating the technical feasibility of aflatoxin risk reduction strategies in Africa

    PubMed Central

    Wu, Felicia; Khlangwiset, Pornsri

    2010-01-01

    Public health interventions must be readily accepted by their target populations to have any meaningful impact, and must have financial and infrastructural support to be feasible in the parts of the world where they are most needed. At the same time, these interventions must be assessed for potential unintended consequences, either to the environment or to human health. In this paper, we evaluate the technical feasibility of interventions to control aflatoxin risk, to be potentially deployed in parts of Africa where aflatoxin exposure poses a significant public health concern. We have applied a conceptual framework for feasibility to four interventions, one associated with each of four different stages of aflatoxin risk: biocontrol (pre-harvest), a post-harvest intervention package (post-harvest), NovaSil clay (dietary), and hepatitis B vaccination (clinical). For each intervention, we have assessed the following four components of technical feasibility: 1) characteristics of the basic intervention, 2) characteristics of delivery, 3) requirements on government capacity, and 4) usage characteristics. We propose ways in which feasibility of each intervention is currently high or low from the perspective of adoption in Africa, how public education is crucial for each of these interventions to succeed, and how to align economic incentives to make the interventions more suitable for less developed countries. PMID:20455160

  4. 47 CFR 22.353 - Blanketing interference.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Operational and Technical Requirements Technical Requirements § 22.353 Blanketing interference. Licensees of... consumer antenna systems, or the use of high gain antennas or antenna booster amplifiers by consumers. (d...

  5. 47 CFR 22.353 - Blanketing interference.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Operational and Technical Requirements Technical Requirements § 22.353 Blanketing interference. Licensees of... consumer antenna systems, or the use of high gain antennas or antenna booster amplifiers by consumers. (d...

  6. 47 CFR 22.353 - Blanketing interference.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Operational and Technical Requirements Technical Requirements § 22.353 Blanketing interference. Licensees of... consumer antenna systems, or the use of high gain antennas or antenna booster amplifiers by consumers. (d...

  7. 47 CFR 22.353 - Blanketing interference.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Operational and Technical Requirements Technical Requirements § 22.353 Blanketing interference. Licensees of... consumer antenna systems, or the use of high gain antennas or antenna booster amplifiers by consumers. (d...

  8. [Improvement of sanitary and epidemiological safety of rail transport--a requirement of the new legislation of the Russian Federation].

    PubMed

    2012-01-01

    Brief analysis of the legal framework in recent years, both in the sphere of technical regulation, and in the field of sanitary and epidemiological welfare of the population is presented in this article. The necessity of inclusion in the technical regulations for the safety of railway rolling stock and elements of railway infrastructure the requirements for sanitary-epidemiological safety and hygiene regulations has been proved. Fragments of technical regulations for railway equipment and infrastructure elements, including the basic requirements for the sanitary-epidemiological security are presented. The position of authors in the processing of the regulatory framework in the field of sanitary-epidemiological welfare of population in standardization documents in accordance with the requirements of federal law "On technical regulation" has been reflected.

  9. Technical Writing: Library Resources for Engineers. A Self-Paced Workbook for the University of Arkansas Libraries. Revised.

    ERIC Educational Resources Information Center

    Dew, Stephen H.

    This self-paced library workbook is a course requirement of all "technical writing" freshman English classes at the University of Arkansas. The technical writing course is required of all engineering students, and its major focus is on writing a term paper containing a bibliography produced through library research. The workbook…

  10. 48 CFR 3419.870 - Acquisition of technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... competition to submit written technical proposals. Otherwise, ED holds oral discussions with the participating... participating in a limited technical competition based on the written technical proposals or oral discussions... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Acquisition of technical...

  11. 3.0 Tesla magnetic resonance imaging: A new standard in liver imaging?

    PubMed Central

    Girometti, Rossano

    2015-01-01

    An ever-increasing number of 3.0 Tesla (T) magnets are installed worldwide. Moving from the standard of 1.5 T to higher field strength implies a number of potential advantage and drawbacks, requiring careful optimization of imaging protocols or implementation of novel hardware components. Clinical practice and literature review suggest that state-of-the-art 3.0 T is equivalent to 1.5 T in the assessment of focal liver lesions and diffuse liver disease. Therefore, further technical improvements are needed in order to fully exploit the potential of higher field strength. PMID:26244063

  12. 3.0 Tesla magnetic resonance imaging: A new standard in liver imaging?

    PubMed

    Girometti, Rossano

    2015-07-28

    An ever-increasing number of 3.0 Tesla (T) magnets are installed worldwide. Moving from the standard of 1.5 T to higher field strength implies a number of potential advantage and drawbacks, requiring careful optimization of imaging protocols or implementation of novel hardware components. Clinical practice and literature review suggest that state-of-the-art 3.0 T is equivalent to 1.5 T in the assessment of focal liver lesions and diffuse liver disease. Therefore, further technical improvements are needed in order to fully exploit the potential of higher field strength.

  13. Geospatial Analysis of Renewable Energy Technical Potential on Tribal Lands

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doris, E.; Lopez, A.; Beckley, D.

    2013-02-01

    This technical report uses an established geospatial methodology to estimate the technical potential for renewable energy on tribal lands for the purpose of allowing Tribes to prioritize the development of renewable energy resources either for community scale on-tribal land use or for revenue generating electricity sales.

  14. Seismic assessment of Technical Area V (TA-V).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Medrano, Carlos S.

    The Technical Area V (TA-V) Seismic Assessment Report was commissioned as part of Sandia National Laboratories (SNL) Self Assessment Requirement per DOE O 414.1, Quality Assurance, for seismic impact on existing facilities at Technical Area-V (TA-V). SNL TA-V facilities are located on an existing Uniform Building Code (UBC) Seismic Zone IIB Site within the physical boundary of the Kirtland Air Force Base (KAFB). The document delineates a summary of the existing facilities with their safety-significant structure, system and components, identifies DOE Guidance, conceptual framework, past assessments and the present Geological and Seismic conditions. Building upon the past information and themore » evolution of the new seismic design criteria, the document discusses the potential impact of the new standards and provides recommendations based upon the current International Building Code (IBC) per DOE O 420.1B, Facility Safety and DOE G 420.1-2, Guide for the Mitigation of Natural Phenomena Hazards for DOE Nuclear Facilities and Non-Nuclear Facilities.« less

  15. Managing to harvest? Perspectives on the potential of aquaculture

    PubMed Central

    Muir, James

    2005-01-01

    Aquaculture has been one of the most rapid and technically innovative of food production sectors globally, with significant investment, scientific and technical development and production growth in many parts of the world over the past two decades. While this has had a significant effect on the global supply of aquatic food products and had an important impact in rural and urban food supply and employment in many developing economies, growth and increasing internationalization has not been without concern for natural resource use, environmental impact and social disruption. The expectations for production and diversification are now significant and while the scientific and technical means are already available to meet much of the intended targets, practical constraints of investment, profitability, resource access and system efficiency are likely to become far more important constraints for the future. This review offers a contemporary perspective on the ways in which the sector might develop, its interactions with constraints and the strategies that may be required to ensure that future development is both positive and sustainable. PMID:15713597

  16. Pathways and Challenges to Innovation in Aerospace

    NASA Technical Reports Server (NTRS)

    Terrile, Richard J.

    2010-01-01

    This paper explores impediments to innovation in aerospace and suggests how successful pathways from other industries can be adopted to facilitate greater innovation. Because of its nature, space exploration would seem to be a ripe field of technical innovation. However, engineering can also be a frustratingly conservative endeavor when the realities of cost and risk are included. Impediments like the "find the fault" engineering culture, the treatment of technical risk as almost always evaluated in terms of negative impact, the difficult to account for expansive Moore's Law growth when making predictions, and the stove-piped structural organization of most large aerospace companies and federally funded research laboratories tend to inhibit cross-cutting technical innovation. One successful example of a multi-use cross cutting application that can scale with Moore's Law is the Evolutionary Computational Methods (ECM) technique developed at the Jet Propulsion Lab for automated spectral retrieval. Future innovations like computational engineering and automated design optimization can potentially redefine space exploration, but will require learning lessons from successful innovators.

  17. Cybersecurity vulnerabilities in medical devices: a complex environment and multifaceted problem

    PubMed Central

    Williams, Patricia AH; Woodward, Andrew J

    2015-01-01

    The increased connectivity to existing computer networks has exposed medical devices to cybersecurity vulnerabilities from which they were previously shielded. For the prevention of cybersecurity incidents, it is important to recognize the complexity of the operational environment as well as to catalog the technical vulnerabilities. Cybersecurity protection is not just a technical issue; it is a richer and more intricate problem to solve. A review of the factors that contribute to such a potentially insecure environment, together with the identification of the vulnerabilities, is important for understanding why these vulnerabilities persist and what the solution space should look like. This multifaceted problem must be viewed from a systemic perspective if adequate protection is to be put in place and patient safety concerns addressed. This requires technical controls, governance, resilience measures, consolidated reporting, context expertise, regulation, and standards. It is evident that a coordinated, proactive approach to address this complex challenge is essential. In the interim, patient safety is under threat. PMID:26229513

  18. Cybersecurity vulnerabilities in medical devices: a complex environment and multifaceted problem.

    PubMed

    Williams, Patricia Ah; Woodward, Andrew J

    2015-01-01

    The increased connectivity to existing computer networks has exposed medical devices to cybersecurity vulnerabilities from which they were previously shielded. For the prevention of cybersecurity incidents, it is important to recognize the complexity of the operational environment as well as to catalog the technical vulnerabilities. Cybersecurity protection is not just a technical issue; it is a richer and more intricate problem to solve. A review of the factors that contribute to such a potentially insecure environment, together with the identification of the vulnerabilities, is important for understanding why these vulnerabilities persist and what the solution space should look like. This multifaceted problem must be viewed from a systemic perspective if adequate protection is to be put in place and patient safety concerns addressed. This requires technical controls, governance, resilience measures, consolidated reporting, context expertise, regulation, and standards. It is evident that a coordinated, proactive approach to address this complex challenge is essential. In the interim, patient safety is under threat.

  19. Technical skills requirement of Indonesian construction labors to work in Malaysia

    NASA Astrophysics Data System (ADS)

    Adi, Henny Pratiwi

    2017-03-01

    Labors skills is an important part of construction projects implementation. Suitability between the skills possessed by labors with the skills needed by user is required to increase employment opportunities. Malaysia is a country that using construction labors from Indonesia. This study aims to get the kind of technical skills required by users of Indonesian constructian labors in Malaysia and also the importance level of technical skills. Data collecting in this research was conducted through interviews and questionnaires on contractors in Malaysia. The next stage was determine the importance level of technical skills in work field of carpenter, bricklayer, plumber and painters. The importance level of technical skills analyzed using the Relative Importance Index (RII). The results showed that mastering the operation of both instruments either manually or electrically is the most importance in the technical skills. Therefore, an understanding of the types of equipment for work field and the manner of operation is need to had by Indonesian construction labors who will work in Malaysia.

  20. Airborne Laser Remote Sensor for Oil Detection and Classification : Engineering Requirements and Technical Considerations Relevant to a Performance Specification

    DOT National Transportation Integrated Search

    1975-08-01

    This report outlines the engineering requirements for an Airborne Laser Remote Sensor for Oil Detection and Classification System. Detailed engineering requirements are given for the major units of the system. Technical considerations pertinent to a ...

  1. Environmental Assessment: Clear Zone and Accident Potential Zone Selective Tree Removal

    DTIC Science & Technology

    2011-05-25

    PROPOSED ACTION The Proposed Action would occur within the CZ and APZs north and south of the runway. The overall area is undeveloped wetland and...existing runway. Therefore, there is no practicable alternative to conducting the action in floodplain/ wetland areas. Three technical alternatives for...or removal would be required. Alternative 3 was eliminated because leaving woody debris in wetlands would not meet U.S. Army Corps of Engineers

  2. Space station data system analysis/architecture study. Task 4: System definition report

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Functional/performance requirements for the Space Station Data System (SSDS) are analyzed and architectural design concepts are derived and evaluated in terms of their performance and growth potential, technical feasibility and risk, and cost effectiveness. The design concepts discussed are grouped under five major areas: SSDS top-level architecture overview, end-to-end SSDS design and operations perspective, communications assumptions and traffic analysis, onboard SSDS definition, and ground SSDS definition.

  3. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  4. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  5. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  6. 7 CFR 653.3 - Adaptation of technical standards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...

  7. 47 CFR 18.207 - Technical report.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...

  8. 47 CFR 18.207 - Technical report.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...

  9. 47 CFR 18.207 - Technical report.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...

  10. The role of non-technical skills in surgery

    PubMed Central

    Agha, Riaz A.; Fowler, Alexander J.; Sevdalis, Nick

    2015-01-01

    Non-technical skills are of increasing importance in surgery and surgical training. A traditional focus on technical skills acquisition and competence is no longer enough for the delivery of a modern, safe surgical practice. This review discusses the importance of non-technical skills and the values that underpin successful modern surgical practice. This narrative review used a number of sources including written and online, there was no specific search strategy of defined databases. Modern surgical practice requires; technical and non-technical skills, evidence-based practice, an emphasis on lifelong learning, monitoring of outcomes and a supportive institutional and health service framework. Finally these requirements need to be combined with a number of personal and professional values including integrity, professionalism and compassionate, patient-centred care. PMID:26904193

  11. [Mathematical model of technical equipment of a clinical-diagnostic laboratory].

    PubMed

    Bukin, S I; Busygin, D V; Tilevich, M E

    1990-01-01

    The paper is concerned with the problems of technical equipment of standard clinico-diagnostic laboratories (CDL) in this country. The authors suggest a mathematic model that may minimize expenditures for laboratory studies. The model enables the following problems to be solved: to issue scientifically-based recommendations for technical equipment of CDL; to validate the medico-technical requirements for newly devised items; to select the optimum types of uniform items; to define optimal technical decisions at the stage of the design; to determine the lab assistant's labour productivity and the cost of some investigations; to compute the medical laboratory engineering requirement for treatment and prophylactic institutions of this country.

  12. 76 FR 80226 - Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... final rule, effective upon publication. Generally, the Administrative Procedure Act (APA) requires a.... Additionally, the APA requires that a final rule must have a delayed effective date of 30 days from the date of... delayed effective date requirement under the APA. 5 U.S.C. 553(d)(3). Again the technical change conforms...

  13. Evaluation of Flight Attendant Technical Knowledge

    NASA Technical Reports Server (NTRS)

    Dunbar, Melisa G.; Chute, Rebecca D.; Rosekind, Mark (Technical Monitor)

    1997-01-01

    Accident and incident reports have indicated that flight attendants have numerous opportunities to provide the flight-deck crew with operational information that may prevent or lessen the severity of a potential problem. Additionally, as carrier fleets transition from three person to two person flight-deck crews, the reliance upon the cabin crew for the transfer of this information may increase further. Recent research indicates that flight attendants do not feel confident in their ability to describe mechanical parts or malfunctions of the aircraft, and the lack of flight attendant technical training has been referenced in a number of recent reports. Chute and Wiener describe five factors which may produce communication barriers between cockpit and cabin crews: the historical background of aviation, the physical separation of the two crews, psychosocial issues, regulatory factors, and organizational factors. By examining these areas of division we can identify possible bridges and address the implications of deficient cockpit/cabin communication on flight safety. Flight attendant operational knowledge may provide some mitigation of these barriers. The present study explored both flight attendant technical knowledge and flight attendant and pilot expectations of flight attendant technical knowledge. To assess the technical knowledge of cabin crewmembers, 177 current flight attendants from two U.S. carriers voluntarily completed a 13-item technical quiz. To investigate expectations of flight attendant technical knowledge, 181 pilots and a second sample of 96 flight attendants, from the same two airlines, completed surveys designed to capture each group's expectations of operational knowledge required of flight attendants. Analyses revealed several discrepancies between the present level of flight attendant operational knowledge and pilots' and flight attendants' expected and desired levels of technical knowledge. Implications for training will be discussed.

  14. Defining Requirements and Related Methods for Designing Sensorized Garments

    PubMed Central

    Andreoni, Giuseppe; Standoli, Carlo Emilio; Perego, Paolo

    2016-01-01

    Designing smart garments has strong interdisciplinary implications, specifically related to user and technical requirements, but also because of the very different applications they have: medicine, sport and fitness, lifestyle monitoring, workplace and job conditions analysis, etc. This paper aims to discuss some user, textile, and technical issues to be faced in sensorized clothes development. In relation to the user, the main requirements are anthropometric, gender-related, and aesthetical. In terms of these requirements, the user’s age, the target application, and fashion trends cannot be ignored, because they determine the compliance with the wearable system. Regarding textile requirements, functional factors—also influencing user comfort—are elasticity and washability, while more technical properties are the stability of the chemical agents’ effects for preserving the sensors’ efficacy and reliability, and assuring the proper duration of the product for the complete life cycle. From the technical side, the physiological issues are the most important: skin conductance, tolerance, irritation, and the effect of sweat and perspiration are key factors for reliable sensing. Other technical features such as battery size and duration, and the form factor of the sensor collector, should be considered, as they affect aesthetical requirements, which have proven to be crucial, as well as comfort and wearability. PMID:27240361

  15. Technical writing versus technical writing

    NASA Technical Reports Server (NTRS)

    Dillingham, J. W.

    1981-01-01

    Two terms, two job categories, 'technical writer' and 'technical author' are discussed in terms of industrial and business requirements and standards. A distinction between 'technical writing' and technical 'writing' is made. The term 'technical editor' is also considered. Problems inherent in the design of programs to prepare and train students for these jobs are discussed. A closer alliance between industry and academia is suggested as a means of preparing students with competent technical communication skills (especially writing and editing skills) and good technical skills.

  16. Application of Research on the Metallogenic Background in the Assessment of Mineral Resources Potentiality

    NASA Astrophysics Data System (ADS)

    Jia, D.; Feng, Y.; Liu, J.; Yao, X.; Zhang, Z.; Ye, T.

    2017-12-01

    1. Working BackgroundCurrent Status of Geological Prospecting: Detecting boundaries and bottoms, making ore search nearby; Seeing the stars, not seeing the Moon; Deep prospecting, undesirable results. The reasons of these problems are the regional metallogenic backgroud unclear and the metallogenic backgroud of the exploration regions unknown. Accordingly, Development and Research Center, CGS organized a geological setting research, in detail investigate metallogenic geological features and acquire mineralization information. 2. Technical SchemeCore research content is prediction elements of Metallogenic Structure. Adopt unified technical requirements from top to bottom, and technical route from bottom to top; Divide elements of mineral forecast and characteristics of geological structure into five elements for research and expression; Make full use of geophysical, geochemical and remote sensing inferences for the interpretation of macro information. After eight years the great project was completed. 3. Main AchievementsInnovation of basic maps compilation content of geological background, reinforce of geological structure data base of potentiality valuation. Preparation of geotectonic facies maps in different scales and professions, providing brand-new geologic background for potentiality assessment, promoting Chinese geotectonic research to the new height. Preparation of 3,375 geological structure thematic base maps of detecting working area in 6 kinds of prediction methods, providing base working maps, rock assemblage, structure of the protolith of geologic body / mineralization / ore controlling for mineral prediction of 25 ores. Enrichment and development of geotectonic facies analysis method, establishment of metallogenic background research thoughts and approach system for assessment of national mineral resources potentiality for the first time. 4. Application EffectOrientation——More and better results with less effort. Positioning——Have a definite object in view. Heart calm down——Confidence.

  17. Panel Resource Management (PRM) Implementation and Effects within Safety Review Panel Settings and Dynamics

    NASA Technical Reports Server (NTRS)

    Taylor, Robert W.; Nash, Sally K.

    2007-01-01

    While technical training and advanced degree's assure proficiency at specific tasks within engineering disciplines, they fail to address the potential for communication breakdown and decision making errors familiar to multicultural environments where language barriers, intimidating personalities and interdisciplinary misconceptions exist. In an effort to minimize these pitfalls to effective panel review, NASA's lead safety engineers to the ISS Safety Review Panel (SRP), and Payload Safety Review Panel (PSRP) initiated training with their engineers, in conjunction with the panel chairs, and began a Panel Resource Management (PRM) program. The intent of this program focuses on the ability to reduce the barriers inhibiting effective participation from all panel attendees by bolstering participants confidence levels through increased communication skills, situational awareness, debriefing, and a better technical understanding of requirements and systems.

  18. Automatic systems and the low-level wind hazard

    NASA Technical Reports Server (NTRS)

    Schaeffer, Dwight R.

    1987-01-01

    Automatic flight control systems provide means for significantly enhancing survivability in severe wind hazards. The technology required to produce the necessary control algorithms is available and has been made technically feasible by the advent of digital flight control systems and accurate, low-noise sensors, especially strap-down inertial sensors. The application of this technology and these means has not generally been enabled except for automatic landing systems, and even then the potential has not been fully exploited. To fully exploit the potential of automatic systems for enhancing safety in wind hazards requires providing incentives, creating demand, inspiring competition, education, and eliminating prejudicial disincentitives to overcome the economic penalties associated with the extensive and riskly development and certification of these systems. If these changes will come about at all, it will likely be through changes in the regulations provided by the certifying agencies.

  19. Analysis of Flue Gas Desulfurization (FGD) Processes for Potential Use on Army Coal-Fired Boilers

    DTIC Science & Technology

    1980-09-01

    TECHNICAL REPORT N-93 September 1980 ANALYSIS OF FLUE GAS DESULFURIZATION (FGD) PROCESSES FOR POTENTIAL USE ON ARMY COAL-FIRED BOILERS TECHNICAL LIBRARY...REFERENCE: Technical Report N-93, Analysis of Flue Gas Desulfurization (FGD) Ppooesses for Potential Use on Army Coal-Fired Boilers Please take a few...REPORT DOCUMENTATION PAGE 1. REPORT NUMBER CERL-TR-N-93 2. GOVT ACCESSION NO «. TITLE (end Subtitle) ANALYSIS OF FLUE GAS DESULFURIZATION (FGD

  20. 77 FR 34784 - Removal of Six Month Line Check Requirement for Pilots Over Age 60; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ...-0486; Amdt. No. 121-359] Removal of Six Month Line Check Requirement for Pilots Over Age 60; Technical... years of age that applied to air carriers engaged in part 121 operations. This technical amendment... December 13, 2007. This legislation raised the upper age limit for pilots in part 121 from age 60 to age 65...

  1. Feasibility study for the Swaziland/Mozambique interconnector. EPC specifications. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-11-01

    This study, conducted by Black & Veatch, was funded by the U.S. Trade and Development Agency. The report, produced for the Ministry of National Resources, Energy and Environment (MNRE) of Swaziland, determines the least cost capacity expansion option to meet the future power demand and system reliability criteria of Swaziland, with particular emphasis on the proposed Interconnector between Swaziland and Mozambique. Volume 3 contains EPC Specifications and is divided into the following divisions: (1) Commercial; (2) General Technical Requirements; (3) Transmission Line Technical Requirements; (4) Substation Technical Requirements; (5) Specifications.

  2. Technical parameters for specifying imagery requirements

    NASA Technical Reports Server (NTRS)

    Coan, Paul P.; Dunnette, Sheri J.

    1994-01-01

    Providing visual information acquired from remote events to various operators, researchers, and practitioners has become progressively more important as the application of special skills in alien or hazardous situations increases. To provide an understanding of the technical parameters required to specify imagery, we have identified, defined, and discussed seven salient characteristics of images: spatial resolution, linearity, luminance resolution, spectral discrimination, temporal discrimination, edge definition, and signal-to-noise ratio. We then describe a generalizing imaging system and identified how various parts of the system affect the image data. To emphasize the different applications of imagery, we have constrasted the common television system with the significant parameters of a televisual imaging system for technical applications. Finally, we have established a method by which the required visual information can be specified by describing certain technical parameters which are directly related to the information content of the imagery. This method requires the user to complete a form listing all pertinent data requirements for the imagery.

  3. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scientific and technical...

  4. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scientific and technical...

  5. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  6. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  7. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  8. 48 CFR 952.242-70 - Technical direction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  9. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  10. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  11. 48 CFR 35.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...

  12. Analysis of Hydropower Potential Utilization of Watercourses in Slovakia

    NASA Astrophysics Data System (ADS)

    Gejguš, Mirko; Aschbacher, Christine; Sablik, Jozef

    2017-09-01

    This article analyzes the hydropower potential of watercourses in Slovakia, defining water as the most promising and most used renewable energy source. The hydro-energetic potential as a source of energy is determined by the calculation of the technically feasible potential of the watercourses, which is divided into exploited and unused. It also identifies the potential of utilizing the unused technical hydro-energetic potential.

  13. 10 CFR 600.144 - Procurement procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... integrity, record of past performance, financial and technical resources or accessibility to other necessary... DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL ASSISTANCE RULES Uniform Administrative... practicable, of technical requirements in terms of functions to be performed or performance required...

  14. 11 CFR 9033.12 - Production of computerized information.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...

  15. 11 CFR 9033.12 - Production of computerized information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...

  16. 11 CFR 9033.12 - Production of computerized information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...

  17. Capability and Technology Performance Goals for the Next Step in Affordable Human Exploration of Space

    NASA Technical Reports Server (NTRS)

    Linne, Diane L.; Sanders, Gerald B.; Taminger, Karen M.

    2015-01-01

    The capability for living off the land, commonly called in-situ resource utilization, is finally gaining traction in space exploration architectures. Production of oxygen from the Martian atmosphere is called an enabling technology for human return from Mars, and a flight demonstration to be flown on the Mars 2020 robotic lander is in development. However, many of the individual components still require technical improvements, and system-level trades will be required to identify the best combination of technology options. Based largely on work performed for two recent roadmap activities, this paper defines the capability and technology requirements that will need to be achieved before this game-changing capability can reach its full potential.

  18. The Economic Potential of Nuclear-Renewable Hybrid Energy Systems Producing Hydrogen

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruth, Mark; Cutler, Dylan; Flores-Espino, Francisco

    This report is one in a series of reports that Idaho National Laboratory and the Joint Institute for Strategic Energy Analysis are publishing that address the technical and economic aspects of nuclear-renewable hybrid energy systems (N-R HESs). This report discusses an analysis of the economic potential of a tightly coupled N-R HES that produces electricity and hydrogen. Both low and high temperature electrolysis options are considered in the analysis. Low-temperature electrolysis requires only electricity to convert water to hydrogen. High temperature electrolysis requires less electricity because it uses both electricity and heat to provide the energy necessary to electrolyze water.more » The study finds that, to be profitable, the examined high-temperature electrosis and low-temperature electrosis N-R HES configurations that produce hydrogen require higher electricity prices, more electricity price volatility, higher natural gas prices, or higher capacity payments than the reference case values of these parameters considered in this analysis.« less

  19. Technology Performance Level Assessment Methodology.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, Jesse D.; Bull, Diana L; Malins, Robert Joseph

    The technology performance level (TPL) assessments can be applied at all technology development stages and associated technology readiness levels (TRLs). Even, and particularly, at low TRLs the TPL assessment is very effective as it, holistically, considers a wide range of WEC attributes that determine the techno-economic performance potential of the WEC farm when fully developed for commercial operation. The TPL assessment also highlights potential showstoppers at the earliest possible stage of the WEC technology development. Hence, the TPL assessment identifies the technology independent “performance requirements.” In order to achieve a successful solution, the entirety of the performance requirements within themore » TPL must be considered because, in the end, all the stakeholder needs must be achieved. The basis for performing a TPL assessment comes from the information provided in a dedicated format, the Technical Submission Form (TSF). The TSF requests information from the WEC developer that is required to answer the questions posed in the TPL assessment document.« less

  20. Methane enrichment digestion experiments at the anaerobic experimental test unit at Walt Disney World. Final report, March 1989-August 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Srivastava, V.J.; Hill, A.H.

    1993-06-01

    The goal of the project was to determine the technical feasibility of utilizing a novel concept in anaerobic digestion, in-situ methane enrichment digestion or MED for producing utility-grade gas from a pilot-scale anaerobic digester. MED tests conducted during this program consistently achieved digester product gas with a methane (CH4) content of greater than 90% (on a dry-, nitrogen-free basis). The MED concept, because it requires relatively simple equipment and modest energy input, has the potential to simplify gas cleanup requirements and substantially reduce the cost of converting wastes and biomass to pipeline quality gas.

  1. Ultra-weak sector, Higgs boson mass, and the dilaton

    DOE PAGES

    Allison, Kyle; Hill, Christopher T.; Ross, Graham G.

    2014-09-26

    The Higgs boson mass may arise from a portal coupling to a singlet fieldmore » $$\\sigma$$ which has a very large VEV $$f \\gg m_\\text{Higgs}$$. This requires a sector of "ultra-weak" couplings $$\\zeta_i$$, where $$\\zeta_i \\lesssim m_\\text{Higgs}^2 / f^2$$. Ultra-weak couplings are technically naturally small due to a custodial shift symmetry of $$\\sigma$$ in the $$\\zeta_i \\rightarrow 0$$ limit. The singlet field $$\\sigma$$ has properties similar to a pseudo-dilaton. We engineer explicit breaking of scale invariance in the ultra-weak sector via a Coleman-Weinberg potential, which requires hierarchies amongst the ultra-weak couplings.« less

  2. Digital imaging technology assessment: Digital document storage project

    NASA Technical Reports Server (NTRS)

    1989-01-01

    An ongoing technical assessment and requirements definition project is examining the potential role of digital imaging technology at NASA's STI facility. The focus is on the basic components of imaging technology in today's marketplace as well as the components anticipated in the near future. Presented is a requirement specification for a prototype project, an initial examination of current image processing at the STI facility, and an initial summary of image processing projects at other sites. Operational imaging systems incorporate scanners, optical storage, high resolution monitors, processing nodes, magnetic storage, jukeboxes, specialized boards, optical character recognition gear, pixel addressable printers, communications, and complex software processes.

  3. Preliminary assessment of high power, NERVA-class dual-mode space nuclear propulsion and power systems

    NASA Astrophysics Data System (ADS)

    Buksa, John J.; Kirk, William L.; Cappiello, Michael W.

    A preliminary assessment of the technical feasibility and mass competitiveness of a dual-mode nuclear propulsion and power system based on the NERVA rocket engine has been completed. Results indicate that the coupling of the Rover reactor to a direct Brayton power conversion system can be accomplished through a number of design features. Furthermore, based on previously published and independently calculated component masses, the dual-mode system was found to have the potential to be mass competitive with propulsion/power systems that use separate reactors. The uncertainties of reactor design modification and shielding requirements were identified as important issues requiring future investigation.

  4. An Overview of Potential Methods for Maintaining Training Area Environments in Arid and Semi-Arid Climates

    DTIC Science & Technology

    1983-04-01

    Shrubs , Ground Covers, and Vines , Technical Manual 5-830-4 (June 1976). This manual provides guidelines and prescribes standard techniques to be used...in planting and the initial care required to successfully establish trees, shrubs , ground covers, and vines . Criteria for selecting materials are...their new location. The planting of trees, shrubs , ground covers, and vines should comply with approved landscape planting plans and should be based on

  5. The Relationship Between the Perceived Executive Management Capabilities of Senior Navy Medical Department Executives and their Reported Managerial Requirements

    DTIC Science & Technology

    1993-06-01

    by implication, the areas to potentially target in executive development courses. Sieveking, Nicholas , and Woods provide additional support from their...and the executive skills outlined by Sieveking,, Nicholas , and Woods in 1992 and Mann and Standenmeyer in 1990. While technical management issues...25) and the executive skills outlined in Sieveking, Nicholas , and Woods in 1992 and Mann and Standenmeyer in 1990. While a broad spectrum of the

  6. Analysis of H2 storage needs for early market non-motive fuel cell applications.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Terry Alan; Moreno, Marcina; Arienti, Marco

    Hydrogen fuel cells can potentially reduce greenhouse gas emissions and the United States dependence on foreign oil, but issues with hydrogen storage are impeding their widespread use. To help overcome these challenges, this study analyzes opportunities for their near-term deployment in five categories of non-motive equipment: portable power, construction equipment, airport ground support equipment, telecom backup power, and man-portable power and personal electronics. To this end, researchers engaged end users, equipment manufacturers, and technical experts via workshops, interviews, and electronic means, and then compiled these data into meaningful and realistic requirements for hydrogen storage in specific target applications. In additionmore » to developing these requirements, end-user benefits (e.g., low noise and emissions, high efficiency, potentially lower maintenance costs) and concerns (e.g., capital cost, hydrogen availability) of hydrogen fuel cells in these applications were identified. Market data show potential deployments vary with application from hundreds to hundreds of thousands of units.« less

  7. Getting Personal: Individuality, Innovation, and Technical Communication.

    ERIC Educational Resources Information Center

    Steiner, Carol J.

    1999-01-01

    Suggests that effective communication between technical and nontechnical people is difficult because technical communication lacks a personal dimension: technical people give up their identity to be considered competent. Argues that a different approach to communication education for scientists, engineers, and technologists is required to equip…

  8. 48 CFR 2052.216-72 - Task order procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...; (5) Technical skills required; and (6) Estimated level of effort. (b) Task order technical proposal. By the date specified in the TORFP, the contractor shall deliver to the contracting officer a written or verbal (as specified in the TORFP technical proposal submittal instructions) technical proposal...

  9. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  10. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  11. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  12. 48 CFR 811.103-70 - Technical industry standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...

  13. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  14. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  15. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  16. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  17. 48 CFR 935.010 - Scientific and technical reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...

  18. 24 CFR 891.175 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Technical assistance. 891.175... Requirements § 891.175 Technical assistance. For purposes of the Section 202 Program and the Section 811 Program, the Secretary shall make available appropriate technical assistance to assure that applicants...

  19. K-Basins Sludge Treatment and Packaging at the Hanford Site - 13585

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fogwell, Thomas W.; Honeyman, James O.; Stegen, Gary

    Highly radioactive sludge resulting from the storage of degraded spent nuclear fuel has been consolidated in Engineered Containers (ECs) in the 105-K West Storage Basin located on the Hanford site near the Columbia River in Washington State. CH2M Hill Plateau Remediation Company (CHPRC) is proceeding with a project to retrieve the sludge, place it in Sludge Transport and Storage Containers (STSCs) and store those filled containers within the T Plant Canyon facility on the Hanford Site Central Plateau (Phase 1). Retrieval and transfer of the sludge material will enable removal of the 105-K West Basin and allow remediation of themore » subsurface contamination plumes under the basin. The U.S. Department of Energy (DOE) plans to treat and dispose of this K Basins sludge (Phase 2) as Remote Handled Transuranic Waste (RH TRU) at the Waste Isolation Pilot Plant (WIPP) located in New Mexico. The K Basin sludge currently contains uranium metal which reacts with water present in the stored slurry, generating hydrogen and other byproducts. The established transportation and disposal requirements require the transformation of the K Basins sludge to a chemically stable, liquid-free, packaged waste form. The Treatment and Packaging Project includes removal of the containerised sludge from T Plant, the treatment of the sludge as required, and packaging of all the sludge into a form that is certifiable for transportation to and disposal at WIPP. Completion of this scope will require construction and operation of a Sludge Treatment and Packaging Facility (STPF), which could be either a completely new facility or a modification of an existing Hanford Site facility. A Technology Evaluation and Alternatives Analysis (TEAA) for the STP Phase 2 was completed in 2011. A Request for Technology Information (RFI) had been issued in October 2009 to solicit candidate technologies for use in Phase 2. The RFI also included a preliminary definition of Phase 2 functions and requirements. Potentially applicable technologies were identified through a commercial procurement process, technical workshops, and review of the numerous previous sludge treatment technology studies. The identified technology approaches were screened using the criteria established in the Decision Plan, and focused bench top feasibility testing was conducted. Engineering evaluations of the costs, schedules, and technical maturity were developed and evaluated. Recommendations were developed based on technical evaluations. The criteria used in the evaluation process were as follows: (1) Safety, (2) Regulatory/stakeholder acceptance, (3) Technical maturity, (4) Operability and maintainability, (5) Life cycle cost and schedule, (6) Potential for beneficial integration with ongoing STP-Phase 1 activities, and (7) Integration with Site-wide RH-TRU processing/packaging, planning, schedule, and approach. The TEAA recommended Warm Water Oxidation (WWO) as the baseline treatment technology and two risk reduction enhancement options for further consideration during development of the process - size reduction and chemical oxidation (Fenton's reagent). The enhancement options would potentially allow a useful reduction in the total operating time required to process the K Basins sludge. The U.S. Department of Energy's Richland Field Office (DOE-RL) has approved this recommended technical approach. The baseline process can be broken down into the following main process steps: (1) STSC transfer from T Plant to the Sludge Treatment and Packaging Facility (STPF). (2) Retrieval of sludge from the STSCs and transfer to the Receipt and Reaction Tank (RRT). (3) Preparation for immobilization by oxidation using heated water (i.e., WWO) for those batches that require it and concentration by evaporating water at about atmospheric pressure in the RRT. (4) Immobilization by using additives to eliminate free liquids and packaging of the treated sludge into drums. (5) Inspection and handling of the filled drums prior to transfer to a separate storage and shipping facility. (6) Handling of vapor, condensate, and other waste streams generated by the process. Each of these steps is discussed in the paper, together with the current state of progress in developing the technology and requirements for continued development. A schematic of the recommended baseline WWO treatment process is given below. (authors)« less

  20. 16 CFR 1401.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL... technical data to prospective purchasers of such products at the time of original purchase and to the first...

  1. Technical Support Document for Title V Permitting of Printing Facilities

    EPA Pesticide Factsheets

    Stationary source emissions monitoring is required to demonstrate that a source is meeting the requirements in Federal or state rules, including Title V. This document provides the technical support for compliance in the printing and publishing industry.

  2. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  3. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  4. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  5. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  6. 47 CFR 18.109 - General technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...

  7. German national femtosecond technology project (FST)

    NASA Astrophysics Data System (ADS)

    Dausinger, Friedrich

    2002-06-01

    The German federal government started the funding of a national project intended to exploit the potential of femtosecond technology. In a forgoing competition five research consortia had been successful and have started now together with an adjoin research consortium their investigations in the following fields: (i) micro-machining of technical materials for microstructuring and drilling, (ii) medical therapy in: ophthalmology, dentistry, neurology and ear surgery, (iii) metrology, (iv) laser safety, (v) x- ray generation. Lasers, systems and technologies required in these potential fields of applications will be investigated. The program aims at industrial success and is dominated by industrial partners, therefore. The more fundamental research is done in university institutes and research centers.

  8. Femtosecond pulses for medicine and production technology: overview of a German national project

    NASA Astrophysics Data System (ADS)

    Dausinger, Friedrich

    2002-02-01

    With the beginning of the new century the German federal government started the funding of a program intended to exploit the potential of femtosecond technology. In a foregoing competition, five research consortia had been successful and have started their investigations in the following fields. - micro-machining of technical materials for microstructure and drilling - medical therapy in : ophthalmology, dentistry, neurology and ear surgery - metrology - laser safety. Lasers, systems and technologies required in these potential fields of applications will be investigated. The program aims at industrial success and is dominated by industrial partners, therefore. The more fundamental research is done in university institutes and research centers.

  9. Solar thermal central receivers for industrial process heat generation: User views and recommendations for commercialization

    NASA Astrophysics Data System (ADS)

    Fish, M. J.

    1981-08-01

    Results of recent meetings with several private industrial groups in which solar thermal central receivers were discussed in depth as a potential for industrial process heat generation are summarized. Topics covering potential economics, technical requirements, and actions to promote commercialization of the technology are presented. These findings are then translated into recommendations for commercialization in private industrial markets. Key points include the need for small scale systems integration projects in addition to the 10 MW/sub e/ plant under construction at Barstow, CA, and the adoption of financial incentives, such as tax credits, for getting the early commercial plants built.

  10. Potential for technically recoverable unconventional gas and oil resources in the Polish-Ukrainian Foredeep, Poland, 2012

    USGS Publications Warehouse

    Gautier, Donald L.; Pitman, Janet K.; Charpentier, Ronald R.; Cook, Troy; Klett, Timothy R.; Schenk, Christopher J.

    2012-01-01

    Using a performance-based geological assessment methodology, the U.S. Geological Survey estimated mean volumes of 1,345 billion cubic feet of potentially technically recoverable gas and 168 million barrels of technically recoverable oil and natural gas liquids in Ordovician and Silurian age shales in the Polish- Ukrainian Foredeep basin of Poland.

  11. Civilian Radioactive Waste Management System Requirements Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less

  12. Life cycle economic and environmental implications of using nanocomposites in automobiles.

    PubMed

    Lloyd, Shannon M; Lave, Lester B

    2003-08-01

    By reducing the energy and materials required to provide goods and services, nanotechnology has the potential to provide more appealing products while improving environmental performance and sustainability. Whether and how soon this potential could be realized depends on phrasing the right research and development (R&D) questions and pursuing commercialization intelligently. A sufficiently broad perspective at the outset is required to understand economic and technical feasibility, estimate life cycle environmental implications, and minimize unanticipated negative impacts. The rapid rise in federally funded nanotechnology R&D dictates that consideration of societal benefits will have a large role in setting the R&D agenda. We estimate potential selected economic and environmental impacts associated with the use of nanotechnology in the automotive industry. In particular, we project the material processing and fuel economy benefits associated with using a clay-polypropylene nanocomposite instead of steel or aluminum in light-duty vehicle body panels. Although the manufacturing cost is currently higher, a life cycle analysis shows potential benefits in reducing energy use and environment discharges by using a nanocomposite design.

  13. 32 CFR 202.13 - Technical assistance for public participation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Reporting Requirements § 202.13 Technical assistance for public participation. Community members of a RAB or TRC may request technical assistance for interpreting scientific and engineering issues with regard to...

  14. Test Plan: WIPP bin-scale CH TRU waste tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Molecke, M.A.

    1990-08-01

    This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientificmore » benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.« less

  15. Security challenges in integration of a PHR-S into a standards based national EHR.

    PubMed

    Mense, Alexander; Hoheiser Pförtner, Franz; Sauermann, Stefan

    2014-01-01

    Health related data provided by patients themselves is expected to play a major role in future healthcare. Data from personal health devices, vaccination records, health diaries or observations of daily living, for instance, is stored in personal health records (PHR) which are maintained by personal health record systems (PHR-S). Combining this information with medical records provided by healthcare providers in electronic health records (EHR) is one of the next steps towards "personal care". Austria currently sets up a nationwide EHR system that incorporates all healthcare providers and is technically based on international standards (IHE, HL7, OASIS, ...). Looking at the expected potential of merging PHR and EHR data it is worth to analyse integration approaches. Although knowing that an integration requires the coordination of processes, information models and technical architectures, this paper specifically focuses on security issues by evaluating general security requirements for a PHR-S (based on HL7 PHR-S FM), comparing them with the information security specifications for the Austrian's national EHR (based on ISO/IES 27000 series) and identifying the main challenges as well as possible approaches.

  16. Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange

    NASA Technical Reports Server (NTRS)

    Haynes, Brian D.

    2015-01-01

    Technology Candidates for Air-to-Air and Air-to-Ground Data Exchange is a two-year research effort to visualize the U. S. aviation industry at a point 50 years in the future, and to define potential communication solutions to meet those future data exchange needs. The research team, led by XCELAR, was tasked with identifying future National Airspace System (NAS) scenarios, determining requirements and functions (including gaps), investigating technical and business issues for air, ground, & air-to-ground interactions, and reporting on the results. The project was conducted under technical direction from NASA and in collaboration with XCELAR's partner, National Institute of Aerospace, and NASA technical representatives. Parallel efforts were initiated to define the information exchange functional needs of the future NAS, and specific communication link technologies to potentially serve those needs. Those efforts converged with the mapping of each identified future NAS function to potential enabling communication solutions; those solutions were then compared with, and ranked relative to, each other on a technical basis in a structured analysis process. The technical solutions emerging from that process were then assessed from a business case perspective to determine their viability from a real-world adoption and deployment standpoint. The results of that analysis produced a proposed set of future solutions and most promising candidate technologies. Gap analyses were conducted at two points in the process, the first examining technical factors, and the second as part of the business case analysis. In each case, no gaps or unmet needs were identified in applying the solutions evaluated to the requirements identified. The future communication solutions identified in the research comprise both specific link technologies and two enabling technologies that apply to most or all specific links. As a result, the research resulted in a new analysis approach, viewing the underlying architecture of ground-air and air-air communications as a whole, rather than as simple "link to function" paired solutions. For the business case analysis, a number of "reference architectures" were developed for both the future technologies and the current systems, based on three typical configurations of current aircraft. Current and future costs were assigned, and various comparisons made between the current and future architectures. In general, it was assumed that if a future architecture offers lower cost than the current typical architecture, while delivering equivalent or better performance, it is likely that the future solution will gain industry acceptance. Conversely, future architectures presenting higher costs than their current counterparts must present a compelling benefit case in other areas or risk a lack of industry acceptance. The business case analysis consistently indicated lower costs for the proposed future architectures, and in most cases, significantly so. The proposed future solutions were found to offer significantly greater functionality, flexibility, and growth potential over time, at lower cost, than current systems. This was true for overall, fleet-wide equipage for domestic and oceanic air carriers, as well as for single, General Aviation (GA) aircraft. The overall research results indicate that all identified requirements can be met by the proposed solutions with significant capacity for future growth. Results also illustrate that the majority of the future communication needs can be met using currently allocated aviation RF spectrum, if used in more effective ways than it is today. A combination of such optimized aviation-specific links and commercial communication systems meets all identified needs for the 50-year future and beyond, with the caveat that a new, overall function will be needed to manage all information exchange, individual links, security, cost, and other factors. This function was labeled "Delivery Manager" (DM) within this research. DM employs a distributed client/server architecture, for both airborne and ground communications architectures. Final research results included identifying the most promising candidate technologies for the future system, conclusions and recommendations, and identifying areas where further research should be considered.

  17. 42 CFR 493.1411 - Standard; Technical consultant qualifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... training or experience to provide technical consultation for each of the specialties and subspecialties of... responsible. Note: The technical consultant requirements for “laboratory training or experience, or both” in... 42 Public Health 5 2010-10-01 2010-10-01 false Standard; Technical consultant qualifications. 493...

  18. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  19. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  20. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  1. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  2. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  3. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  4. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  5. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  6. 48 CFR 852.211-72 - Technical industry standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...

  7. Present Challenges, Critical Needs, and Future Technological Directions for NASA's GN and C Engineering Discipline

    NASA Technical Reports Server (NTRS)

    Dennehy, Cornelius J.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) is currently undergoing a substantial redirection. Notable among the changes occurring within NASA is the stated emphasis on technology development, integration, and demonstration. These new changes within the Agency should have a positive impact on the GN&C discipline given the potential for sizeable investments for technology development and in-space demonstrations of both Autonomous Rendezvous & Docking (AR&D) systems and Autonomous Precision Landing (APL) systems. In this paper the NASA Technical Fellow for Guidance, Navigation and Control (GN&C) provides a summary of the present technical challenges, critical needs, and future technological directions for NASA s GN&C engineering discipline. A brief overview of the changes occurring within NASA that are driving a renewed emphasis on technology development will be presented as background. The potential benefits of the planned GN&C technology developments will be highlighted. This paper will provide a GN&C State-of-the-Discipline assessment. The discipline s readiness to support the goals & objectives of each of the four NASA Mission Directorates is evaluated and the technical challenges and barriers currently faced by the discipline are summarized. This paper will also discuss the need for sustained investments to sufficiently mature the several classes of GN&C technologies required to implement NASA crewed exploration and robotic science missions.

  8. Laboratory Directed Research and Development 1998 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pam Hughes; Sheila Bennett eds.

    1999-07-14

    The Laboratory's Directed Research and Development (LDRD) program encourages the advancement of science and the development of major new technical capabilities from which future research and development will grow. Through LDRD funding, Pacific Northwest continually replenishes its inventory of ideas that have the potential to address major national needs. The LDRD program has enabled the Laboratory to bring to bear its scientific and technical capabilities on all of DOE's missions, particularly in the arena of environmental problems. Many of the concepts related to environmental cleanup originally developed with LDRD funds are now receiving programmatic support from DOE, LDRD-funded work inmore » atmospheric sciences is now being applied to DOE's Atmospheric Radiation Measurement Program. We also have used concepts initially explored through LDRD to develop several winning proposals in the Environmental Management Science Program. The success of our LDRD program is founded on good management practices that ensure funding is allocated and projects are conducted in compliance with DOE requirements. We thoroughly evaluate the LDRD proposals based on their scientific and technical merit, as well as their relevance to DOE's programmatic needs. After a proposal is funded, we assess progress annually using external peer reviews. This year, as in years past, the LDRD program has once again proven to be the major enabling vehicle for our staff to formulate new ideas, advance scientific capability, and develop potential applications for DOE's most significant challenges.« less

  9. The Intertwining of Enterprise Strategy and Requirements

    NASA Astrophysics Data System (ADS)

    Loucopoulos, Pericles; Garfield, Joy

    Requirements Engineering techniques need to focus not only on the target technical system, as has traditionally been the case, but also on the interplay between business and system functionality. Whether a business wishes to exploit advances in technology to achieve new strategic objectives or to organise work in innovative ways, the process of Requirements Engineering could and should present opportunities for modelling and evaluating the potential impact that technology can bring about to the enterprise.This chapter discusses a co-designing process that offers opportunities of change to both the business and its underlying technical systems, in a synergistic manner. In these design situations some of the most challenging projects involve multiple stakeholders from different participating organisations, subcontractors, divisions etc who may have a diversity of expertise, come from different organisational cultures and often have competing goals. Stakeholders are faced with many different alternative future ‘worlds’ each one demanding a possibly different development strategy.There are acute questions about the potential structure of the new business system and how key variables in this structure could impact on the dynamics of the system. This chapter presents a framework which enables the evaluation of requirements through (a) system dynamics modelling, (b) ontology modelling, (c) scenario modelling and (d) rationale modelling. System dynamics modelling is used to define the behaviour of an enterprise system in terms of four perspectives. Ontology modelling is used to formally define invariant components of the physical and social world within the enterprise domain. Scenario modelling is used to identify critical variables and by quantitatively analyzing the effects of these variables through simulation to better understand the dynamic behaviour of the possible future structures. Rationale modelling is used to assist collaborative discussions when considering either ontology models or scenarios for change, developing maps, which chart the assumptions and reasoning behind key decisions during the requirements process.

  10. 30 CFR 7.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... was issued. Equivalent non-MSHA product safety standards. A non-MSHA product safety standard, or group... this part. Applicant. An individual or organization that manufactures or controls the assembly of a... technical requirements and have been manufactured as approved. Technical requirements. The design and...

  11. 30 CFR 7.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... was issued. Equivalent non-MSHA product safety standards. A non-MSHA product safety standard, or group... this part. Applicant. An individual or organization that manufactures or controls the assembly of a... technical requirements and have been manufactured as approved. Technical requirements. The design and...

  12. 30 CFR 7.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... was issued. Equivalent non-MSHA product safety standards. A non-MSHA product safety standard, or group... this part. Applicant. An individual or organization that manufactures or controls the assembly of a... technical requirements and have been manufactured as approved. Technical requirements. The design and...

  13. 30 CFR 7.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... was issued. Equivalent non-MSHA product safety standards. A non-MSHA product safety standard, or group... this part. Applicant. An individual or organization that manufactures or controls the assembly of a... technical requirements and have been manufactured as approved. Technical requirements. The design and...

  14. 30 CFR 7.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... was issued. Equivalent non-MSHA product safety standards. A non-MSHA product safety standard, or group... this part. Applicant. An individual or organization that manufactures or controls the assembly of a... technical requirements and have been manufactured as approved. Technical requirements. The design and...

  15. 7 CFR 802.0 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... requirements set forth in this part 802 describe certain specifications, tolerances, and other technical... Standards and Technology (NIST) Handbook 44, “Specifications, Tolerances, and Other Technical Requirements...), “Specifications and Tolerances for Reference Standards and Field Standard Weights and Measures,” (Handbook 105-1...

  16. 75 FR 14482 - Fifty-First Meeting: RTCA Special Committee 186: Automatic Dependent Surveillance-Broadcast (ADS-B)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ..., WG-1, Wake Vortex, ARINC Room. RTCA--All Day, WG-4, Application Technical Requirements, Colson Board... Vortex, MacIntosh-NBAA Room & Hilton-ATA Room. RTCA--All Day, WG-4, Application Technical Requirements...

  17. Technical Assistance Needs Assessments (TANAs)

    EPA Pesticide Factsheets

    The Technical Assistance Needs Assessment (TANA) is a process to identify whether a community requires additional support from EPA in order to understand technical information and have meaningful participation in the Superfund decision-making process.

  18. Coupling a high resolution soil erosion model with an agro-ecosystem model of SOC dynamics. An approach to assess the potential environmental effect of the new Common Agricultural Policy on soil degradation

    NASA Astrophysics Data System (ADS)

    Borrelli, Pasqualle; Paustian, Keith; Panagos, Panos; Jones, Arwyn; Schütt, Brigitta; Lugato, Emanuele

    2016-04-01

    At the European Union level, the main mechanisms to promote a more sustainable and environmentally friendly agriculture was introduced by the Common Agricultural Policy (CAP) reform in 2003, through the Cross-compliance. According to this new regulation, the farmer support payments were regulated with respect to environmental, animal welfare and food safety standards. This brought to the Good Agricultural and Environmental Conditions (GAEC), firstly established by Council Regulation No. 1782/2003 and subsequently Council Regulation (EC) No 73/2009. The prevention of soil erosion and maintenance of soil organic matter were two of GAEC requirements, which each Member State was obliged to address through national standards such as: i) minimal soil cover maintenance (GAEC 4); ii) minimum land management reflecting site specific conditions to limit soil loss (GAEC 5) and iii) maintenance of soil organic matter level through appropriate practices including ban on burning arable stubbles (GAEC 6). Although Member States are required to verify whether the farmers are compliant with the regulations (Cross-compliance), the environmental effect of Good Agricultural and Environmental Conditions (GAEC) applications on erosion and carbon budgets are still little known and studied. To investigate the potential impacts of the GAEC, we coupled a high resolution erosion model based on Revised Universal Soil Loss Equation (RUSLE) with the CENTURY biogeochemical model (Land Use Policy, 50, 408-421; 2016). The Italian arable land was selected as a study area, since it is well-known to be highly sensitive to soil erosion. Multi scenario modelling approach was undertaken, i.e., i) a baseline scenario without scenario excluding GAEC (pre 2003 period); ii) a present scenario including the current GAEC standards (post 2003 period), and iii) a technical potential scenario assuming that the GAEC standards were applied to the entire Italian arable land. The results show a 10.8% decrease, from 8.33 Mg ha-1 yr-1 to 7.43 Mg ha-1 yr-1, in soil loss potential due to the adoption of the GAEC conservation practices (with respect to the baseline scenario). The technical potential scenario shows a 50.1% decrease in the soil loss potential (soil loss 4.1 Mg ha-1 yr-1). With regard to the soil organic carbon (SOC), the GAEC application in the current scenario shown an overall soil organic carbon (SOC) gains, with about 17% of the SOC variation related to avoided SOC transport by sediment erosion. The technical potential scenario suggests a potential gain up to 23.3 Mt of C by 2020 with the full GAEC application.

  19. Carbon Dioxide Observational Platform System (CO-OPS), feasibility study

    NASA Technical Reports Server (NTRS)

    Bouquet, D. L.; Hall, D. W.; Mcelveen, R. P.

    1987-01-01

    The Carbon Dioxide Observational Platform System (CO-OPS) is a near-space, geostationary, multi-user, unmanned microwave powered monitoring platform system. This systems engineering feasibility study addressed identified existing requirements such as: carbon dioxide observational data requirements, communications requirements, and eye-in-the-sky requirements of other groups like the Defense Department, the Forestry Service, and the Coast Guard. In addition, potential applications in: earth system science, space system sciences, and test and verification (satellite sensors and data management techniques) were considered. The eleven month effort is summarized. Past work and methods of gathering the required observational data were assessed and rough-order-of magnitude cost estimates have shown the CO-OPS system to be most cost effective (less than $30 million within a 10 year lifetime). It was also concluded that there are no technical, schedule, or obstacles that would prevent achieving the objectives of the total 5-year CO-OPS program.

  20. ExM:System Support for Extreme-Scale, Many-Task Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Katz, Daniel S

    The ever-increasing power of supercomputer systems is both driving and enabling the emergence of new problem-solving methods that require the effi cient execution of many concurrent and interacting tasks. Methodologies such as rational design (e.g., in materials science), uncertainty quanti fication (e.g., in engineering), parameter estimation (e.g., for chemical and nuclear potential functions, and in economic energy systems modeling), massive dynamic graph pruning (e.g., in phylogenetic searches), Monte-Carlo- based iterative fi xing (e.g., in protein structure prediction), and inverse modeling (e.g., in reservoir simulation) all have these requirements. These many-task applications frequently have aggregate computing needs that demand the fastestmore » computers. For example, proposed next-generation climate model ensemble studies will involve 1,000 or more runs, each requiring 10,000 cores for a week, to characterize model sensitivity to initial condition and parameter uncertainty. The goal of the ExM project is to achieve the technical advances required to execute such many-task applications efficiently, reliably, and easily on petascale and exascale computers. In this way, we will open up extreme-scale computing to new problem solving methods and application classes. In this document, we report on combined technical progress of the collaborative ExM project, and the institutional financial status of the portion of the project at University of Chicago, over the rst 8 months (through April 30, 2011)« less

  1. Technical Skill Attainment and Post-Program Outcomes: An Analysis of Pennsylvania Secondary Career and Technical Education Graduates

    ERIC Educational Resources Information Center

    Staklis, Sandra; Klein, Steven

    2010-01-01

    Since the mid-1990s, the Pennsylvania Department of Education (PDE) has required all students concentrating in career and technical education (CTE) programs to complete a standardized technical skill assessment at or near the end of their program. Results of technical skill assessments are used for a number of purposes, including recognizing…

  2. Critical analysis of pyrolysis process with cellulosic based municipal waste as renewable source in energy and technical perspective.

    PubMed

    Agarwal, Manu; Tardio, James; Venkata Mohan, S

    2013-11-01

    To understand the potential of cellulosic based municipal waste as a renewable feed-stock, application of pyrolysis by biorefinery approach was comprehensively studied for its practicable application towards technical and environmental viability in Indian context. In India, where the energy requirements are high, the pyrolysis of the cellulosic waste shows numerous advantages for its applicability as a potential waste-to-energy technology. The multiple energy outputs of the process viz., bio-gas, bio-oil and bio-char can serve the two major energy sectors, viz., electricity and transportation. The process suits best for high bio-gas and electrical energy production when energy input is satisfied from bio-char in form of steam (scheme-1). The bio-gas generated through the process shows its direct utility as a transportation fuel while the bio-oil produced can serve as fuel or raw material to chemical synthesis. On a commercial scale the process is a potent technology towards sustainable development. The process is self-sustained when operated on a continuous mode. Copyright © 2013 Elsevier Ltd. All rights reserved.

  3. Assessing Students' Technical Skill Attainment

    ERIC Educational Resources Information Center

    Jorgensen, Haley

    2010-01-01

    The Wisconsin Technical College System (WTCS) is working to comply with the Carl D. Perkins Career and Technical Education Improvement Act of 2006 (Perkins) to ensure that its graduates have mastered the technical skills needed by business and industry. The legislation requires that each state identify and approve program assessment strategies…

  4. 78 FR 42821 - Agency Information Collection (Technical Industry Standards) Activities Under OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-17

    ... (Technical Industry Standards) Activities Under OMB Review AGENCY: Office of Acquisition and Logistics... Affairs Acquisition Regulation (VAAR) Provision 852.211-72 (formerly 852.211-75), Technical Industry.... Abstract: VAAR provision 852.211-72, Technical Industry Standards, requires items offered for sale to VA...

  5. Space Tug Aerobraking Study. Volume 2: Technical

    NASA Technical Reports Server (NTRS)

    Corso, C. J.; Eyer, C. L.

    1972-01-01

    The feasibility and practicality of employing an aerobraking trajectory for return of the reusable Space Tug from geosynchronous and other high energy missions was investigated. The aerobraking return trajectory modes from high orbits employ transfer ellipses which have low perigee altitudes wherein the earth's sensible atmosphere provides drag to reduce the Tug descent delta velocity requirements and thus decrease the required return trip propulsive energy. An aerobraked Space Tug, sized to the Space Shuttle payload capability and dimensional constraints, can accomplish 95 percent of the geosynchronous missions with a single Shuttle/Tug launch per mission. Aerodynamics, aerothermodynamics, trajectory, quidance and control, configuration concepts, materials, weights and performance parameters were identified. Sensitivities to trajectory uncertainties, atmospheric anomalies and re-entry environments were determined. New technology requirements and future studies required to further enhance the aerobraking potential were identified.

  6. Non-technical skills for obstetricians conducting forceps and vacuum deliveries: qualitative analysis by interviews and video recordings.

    PubMed

    Bahl, Rachna; Murphy, Deirdre J; Strachan, Bryony

    2010-06-01

    Non-technical skills are cognitive and social skills required in an operational task. These skills have been identified and taught in the surgical domain but are of particular relevance to obstetrics where the patient is awake, the partner is present and the clinical circumstances are acute and often stressful. The aim of this study was to define the non-technical skills of an operative vaginal delivery (forceps or vacuum) to facilitate transfer of skills from expert obstetricians to trainee obstetricians. Qualitative study using interviews and video recordings. The study was conducted at two university teaching hospitals (St. Michael's Hospital, Bristol and Ninewells Hospital, Dundee). Participants included 10 obstetricians and eight midwives identified as experts in conducting or supporting operative vaginal deliveries. Semi-structured interviews were carried out using routine clinical scenarios. The experts were also video recorded conducting forceps and vacuum deliveries in a simulation setting. The interviews and video recordings were transcribed verbatim and analysed using thematic coding. The anonymised data were independently coded by the three researchers and then compared for consistency of interpretation. The experts reviewed the coded data for respondent validation and clarification. The themes that emerged were used to identify the non-technical skills required for conducting an operative vaginal delivery. The final skills list was classified into seven main categories. Four categories (situational awareness, decision making, task management, and team work and communication) were similar to the categories identified in surgery. Three further categories unique to obstetrics were also identified (professional relationship with the woman, maintaining professional behaviour and cross-monitoring of performance). This explicitly defined skills taxonomy could aid trainees' understanding of the non-technical skills to be considered when conducting an operative vaginal delivery and potentially reduce morbidity and improve the experience of delivery for the mother. Copyright 2010 Elsevier Ireland Ltd. All rights reserved.

  7. 13 CFR 306.3 - Application requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...

  8. 47 CFR 80.271 - Technical requirements for portable survival craft radiotelephone transceivers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... craft radiotelephone transceivers. 80.271 Section 80.271 Telecommunication FEDERAL COMMUNICATIONS... Authorization for Compulsory Ships § 80.271 Technical requirements for portable survival craft radiotelephone transceivers. (a) Portable survival craft radiotelephone transceivers must comply with the following: (1) The...

  9. 13 CFR 306.3 - Application requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...

  10. 13 CFR 306.3 - Application requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...

  11. 13 CFR 306.3 - Application requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...

  12. 13 CFR 306.3 - Application requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...

  13. 47 CFR 22.377 - Certification of transmitters.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.377 Certification of transmitters. Except as provided in paragraph (b) of this section, transmitters used in the Public Mobile Services, including those used with signal boosters, in-building radiation systems and cellular repeaters...

  14. Data Requirements Review Boards and Their Importance

    DTIC Science & Technology

    2016-02-01

    data: technical data, which are recorded technical or scientific information (not including computer software), and contractual or financial and...navy.mil. References for This Article and Other Useful Sources NAVAIRINST 4200.21E—Naval Air SystemsCommand Data Requirements Review Board DoD

  15. The requirements for batteries for electric vehicles

    NASA Technical Reports Server (NTRS)

    Schwartz, H. J.

    1976-01-01

    Analysis of automobile use patterns shows that the battery requirements for an urban car can be met by mid-term battery technology. The far-term technology potentially offers greater range but does not proportionately increase the usefulness of the vehicle. This suggests that emphasis should be shifted toward more modest energy density goals, if such a shift would ease technical problems and allow the use of lower cost materials and construction methods. A technology diffusion model indicates that the impact of the mid-term batteries by the year 2000 would be greater than that of the far-term batteries because of their earlier introduction and nearly equal market potential. From the standpoint of maximizing both the cumulative impact and the benefits derived in the year 2000, however, a strategy of early introduction of near-term and mid-term cars followed by the far-term vehicle would produce the optimum results.

  16. 3D-printed biological organs: medical potential and patenting opportunity.

    PubMed

    Yoo, Seung-Schik

    2015-05-01

    Three-dimensional (3D) bioprinting has emerged as a new disruptive technology that may address the ever-increasing demand for organ transplants. 3D bioprinting offers many technical features that allow for building functional biological tissue constructs by dispensing the individual or group of cells into specific locations along with various types of bio-scaffold materials and extracellular matrices, and thus, may provide flexibility needed for on-demand individualized construction of biological organs. Several key classes of 3D bioprinting techniques are reviewed, including potential medical and industrial applications. Several unanswered engineering components for the ultimate creation of printed biological organs are also discussed. The complicated nature of the human organs, in addition to the legal and ethical requirements for safe implantation into the human body, would require significant research and development to produce marketable bioprinted organs. This also suggests the possibility for further patenting and licensing opportunities from different sectors of the economy.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sheaffer, P.; Lemar, P.; Honton, E. J.

    The Universal Interconnection Technology (UIT) Workshop - sponsored by the U.S. Department of Energy, Distributed Energy and Electric Reliability (DEER) Program, and Distribution and Interconnection R&D - was held July 25-26, 2002, in Chicago, Ill., to: (1) Examine the need for a modular universal interconnection technology; (2) Identify UIT functional and technical requirements; (3) Assess the feasibility of and potential roadblocks to UIT; (4) Create an action plan for UIT development. These proceedings begin with an overview of the workshop. The body of the proceedings provides a series of industry representative-prepared papers on UIT functions and features, present interconnection technology,more » approaches to modularization and expandability, and technical issues in UIT development as well as detailed summaries of group discussions. Presentations, a list of participants, a copy of the agenda, and contact information are provided in the appendices of this document.« less

  18. Generation of useful energy from process fluids using the biphase turbine

    NASA Astrophysics Data System (ADS)

    Helgeson, N. L.

    1981-01-01

    The six largest energy consuming industries in the United States were surveyed to determine the energy savings that could result from applying the Biphase turbine to industrial process streams. A national potential energy savings of 58 million barrels of oil per year (technical market) was identified. This energy is recoverable from flashing gas liquid process streams and is separate and distinct from exhaust gas waste heat recovery. The industries surveyed in this program were the petroleum chemical, primary metals, paper and pulp, stone-clay-glass, and food. It was required to determine the applicability of the Biphase turbine to flashing operations connected with process streams, to determine the energy changes associated with these flashes if carried out in a Biphase turbine, and to determine the suitability (technical and economical feasibility) of applying the Biphase turbine to these processes.

  19. [Minimally invasive surgery and robotic surgery: surgery 4.0?].

    PubMed

    Feußner, H; Wilhelm, D

    2016-03-01

    Surgery can only maintain its role in a highly competitive environment if results are continuously improved, accompanied by further reduction of the interventional trauma for patients and with justifiable costs. Significant impulse to achieve this goal was expected from minimally invasive surgery and, in particular, robotic surgery; however, a real breakthrough has not yet been achieved. Accordingly, the new strategic approach of cognitive surgery is required to optimize the provision of surgical treatment. A full scale integration of all modules utilized in the operating room (OR) into a comprehensive network and the development of systems with technical cognition are needed to upgrade the current technical environment passively controlled by the surgeon into an active collaborative support system (surgery 4.0). Only then can the true potential of minimally invasive surgery and robotic surgery be exploited.

  20. An Effective Health and Medical Technical Authority

    NASA Technical Reports Server (NTRS)

    Fogarty, Jennifer A.

    2009-01-01

    The NASA Governance model directed the formation of three Technical Authorities, Engineering; Safety and Mission Assurance; and Health and Medical, to ensure that risks are identified and adjudicated efficiently and transparently in concert with the spaceflight programs and projects. The Health and Medical Technical Authority (HMTA) has been implemented at the Johnson Space Center (JSC) and consists of the Chief Medical Office (CMO), the Deputy CMO, and HMTA Delegates. The JSC HMTA achieves the goals of risk identification and adjudication through the discharge of the appropriate technical expertise to human space flight programs and projects and the escalation of issues within program and technical authority boards. The JSC HMTA relies on subject matter experts (SMEs) in the Space Life Sciences Directorate at JSC as well as experts from other Centers to work crew health and performance issues at the technical level, develop requirements, oversee implementation and validation of requirements, and identify risks and non-compliances. Once a risk or potential noncompliance has been identified and reported to the programs or projects, the JSC HMTA begins to track it and closely monitor the program's or project's response. As a risk is developed or a non-compliance negotiated, positions from various levels of decision makers are sought at the program and project control boards. The HMTA may support a program or project position if it is satisfied with the decision making and vetting processes (ex. the subject matter expert voiced his/her concerns and all dissenting opinions were documented) and finds that the position both acknowledges the risk and cost of the mitigation and resolves the issue without changing NASA risk posture. The HMTA may disagree with a program or project position if the NASA risk posture has been elevated or obfuscated. If the HMTA does disagree with the program or project position, it will appeal to successively higher levels of authority so that risk acceptance and risk trades will be acknowledged and sanctioned at the highest appropriate level; this includes Program Managers, Mission Directorate Associate Administrators and the Agency Administrator.

  1. Technical and Political Assessment of Peaceful Nuclear Power Program Prospects in North Africa and the Middle East

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Windsor, Lindsay K.; Kessler, Carol E.

    An exceptional number of Middle Eastern and North African nations have recently expressed interest in developing nuclear energy for peaceful purposes. Many of these countries have explored nuclear research in limited ways in the past, but the current focused interest and application of resources towards developing nuclear-generated electricity and nuclear-powered desalination plants is unprecedented. Consequently, questions arise in response to this emerging trend: What instigated this interest? To what end(s) will a nuclear program be applied? Does the country have adequate technical, political, legislative, nonproliferation, and safety infrastructure required for the capability desired? If so, what are the next stepsmore » for a country in preparation for a future nuclear program? And if not, what collaboration efforts are possible with the United States or others? This report provides information on the capabilities and interests of 13 countries in the region in nuclear energy programs in light of safety, nonproliferation and security concerns. It also provides information useful for determining potential for offering technical collaboration, financial aid, and/or political support.« less

  2. Lessons Learned in Over a Decade of Technical Support for U.S. Nuclear Cyber Security Programmes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glantz, Clifford S.; Landine, Guy P.; Craig, Philip A.

    Pacific Northwest National Laboratory’s (PNNL) nuclear cyber security team has been providing technical support to the U.S. Nuclear Regulatory Commission (NRC) since 2002. This team has provided cyber security technical experties in conducting cyber security inspections, developing of regulatory rules and guidance, reviewing facility cyber security plans, developing inspection guidance, and developing and teaching NRC inspectors how to conduct cyber security assessments. The extensive experience the PNNL team has gathered has allowed them to compile a lenghty list of recommendations on how to improve cyber security programs and conduct assessments. A selected set of recommendations are presented, including the needmore » to: integrate an array of defenisve strategies into a facility’s cyber security program, coordinate physical and cyber security activities, train phycial security forces to resist a cyber-enabled physical attack, improve estimates of the consequences of a cyber attack, properly resource cyber security assessments, appropropriately account for insider threats, routinely monitor security devices for potential attacks, supplement compliance-based requirements with risk-based decision making, and introduce the concept of resilience into cyber security programs.« less

  3. Study for identification of beneficial Uses of Space (BUS). Volume 2: Technical report. Book 3: Development and business analysis of space processed tungsten fox X-ray targets

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The development plans, analysis of required R and D and production resources, the costs of such resources, and finally, the potential profitability of a commercial space processing opportunity for containerless melting and resolidification of tungsten are discussed. The aim is to obtain a form of tungsten which, when fabricated into targets for X-ray tubes, provides at least, a 50 percent increase in service life.

  4. Relevant Optical Issues of the SPM-Twin Telescopes

    NASA Astrophysics Data System (ADS)

    González, J. J.; Orlov, V.

    2007-06-01

    Most technical aspects of the SPM-Twin Telescopes have been basically solved by the Magellan and MMT projects. However, the Spectroscopic "Wide Field Telescope" will be the first of its kind and an optical solution based on Magellan needs to be further investigated. In addition, the requirements for adaptive optics for the Standard Field Telescope need to be worked out. In this contribution we will compare optical wide field conceptual designs and the potential scope of AO for SPM-Twin.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, D.M.; Huffmyer, W.A.; Greener, J.M.

    This paper describes the geoscience and engineering aspects of the Opon Gas Field located in the Middle Magdalena Basin, Colombia. The remoteness and extreme downhole conditions make the drilling, completion, testing and geoscience interpretation of the two most recent Opon wells technically very challenging. Multiple faults, steep dips, rugged topography, a sensitive jungle environment and variable surface velocities complicate field definition. A full assessment of the commercial potential of the reservoir requires additional development drilling. Now in the early development stages, the Opon Gas Field has first production scheduled for late 1996.

  6. M-X Environmental Technical Report. Alternative Potential Deployment Areas: Texas/New Mexico.

    DTIC Science & Technology

    1980-12-22

    437.2 466.7 Motor Vehicle Sales Tax 401.1 433.3 Cigarette and Tobacco Taxes 300.3 309.8 Corporate Franchise Tax 264.9 293.8 Alcoholic Beverage Tax... benefits of several :"t,-stt metroplitan areas in effect in first half of 1980. Wage may also take he torn. of per diet’.. travtel subsistance...locations other than operating bases as this study assumes. Roughly 300 persons per ASC would be required, as would local procurement for food and other

  7. Marine applications for fuel cell technology: A technical memorandum

    NASA Astrophysics Data System (ADS)

    1986-02-01

    To date, almost no attention was given to the potential marine applications for fuel cell technologies. Some of the benefits that fuel cells may offer to the utility industry may also apply to marine use. At a 1 day workshop the Office of Technology Assessment found fuel cells to offer advantages in applications requiring quiet operations, applications where throttle settings are constantly changed, and for small submarines. Fuel cells are not expected to penetrate marine markets until they become firmly established in the commercial utility section.

  8. Coordinating Council. Sixth Meeting: Who Are Our Key Users?

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This NASA Scientific and Technical Information Program Coordinating Council meeting deals with the topic 'Who are our key users?' Presentations were made on the following subtopics: Key users: Who uses the system the most, Who orders the most documents, Users: What do we know about them?, NASA/DOD Aerospace Knowledge Diffusion research project on 'Potential key users', How we meet the user's needs, and STI Council user requirements update. Summaries of discussions after the presentations are included along with visuals for the presentations.

  9. The potential for land sparing to offset greenhouse gas emissions from agriculture

    NASA Astrophysics Data System (ADS)

    Lamb, Anthony; Green, Rhys; Bateman, Ian; Broadmeadow, Mark; Bruce, Toby; Burney, Jennifer; Carey, Pete; Chadwick, David; Crane, Ellie; Field, Rob; Goulding, Keith; Griffiths, Howard; Hastings, Astley; Kasoar, Tim; Kindred, Daniel; Phalan, Ben; Pickett, John; Smith, Pete; Wall, Eileen; Zu Ermgassen, Erasmus K. H. J.; Balmford, Andrew

    2016-05-01

    Greenhouse gas emissions from global agriculture are increasing at around 1% per annum, yet substantial cuts in emissions are needed across all sectors. The challenge of reducing agricultural emissions is particularly acute, because the reductions achievable by changing farming practices are limited and are hampered by rapidly rising food demand. Here we assess the technical mitigation potential offered by land sparing--increasing agricultural yields, reducing farmland area and actively restoring natural habitats on the land spared. Restored habitats can sequester carbon and can offset emissions from agriculture. Using the UK as an example, we estimate net emissions in 2050 under a range of future agricultural scenarios. We find that a land-sparing strategy has the technical potential to achieve significant reductions in net emissions from agriculture and land-use change. Coupling land sparing with demand-side strategies to reduce meat consumption and food waste can further increase the technical mitigation potential--however, economic and implementation considerations might limit the degree to which this technical potential could be realized in practice.

  10. Managing Information On Technical Requirements

    NASA Technical Reports Server (NTRS)

    Mauldin, Lemuel E., III; Hammond, Dana P.

    1993-01-01

    Technical Requirements Analysis and Control Systems/Initial Operating Capability (TRACS/IOC) computer program provides supplemental software tools for analysis, control, and interchange of project requirements so qualified project members have access to pertinent project information, even if in different locations. Enables users to analyze and control requirements, serves as focal point for project requirements, and integrates system supporting efficient and consistent operations. TRACS/IOC is HyperCard stack for use on Macintosh computers running HyperCard 1.2 or later and Oracle 1.2 or later.

  11. Measuring efficiency of cotton cultivation in Pakistan: a restricted production frontier study.

    PubMed

    Watto, Muhammad Arif; Mugera, Amin

    2014-11-01

    Massive groundwater pumping for irrigation has started lowering water tables rapidly in different regions of Pakistan. Declining water tables have thus prompted research efforts to improve agricultural productivity and efficiency to make efficient use of scarce water resources. This study employs a restricted stochastic production frontier to estimate the level of, and factors affecting, technical efficiency of groundwater-irrigated cotton farms in the Punjab province of Pakistan. The mean technical efficiency estimates indicate substantial technical inefficiencies among cotton growers. On average, tube-well owners and water buyers can potentially increase cotton production by 19% and 28%, respectively, without increasing the existing input level. The most influential factors affecting technical efficiency positively are the use of improved quality seed, consultation with extension field staff and farmers' perceptions concerning the availability of groundwater resources for irrigation in the future. This study proposes that adopting improved seed for new cotton varieties and providing better extension services regarding cotton production technology would help to achieve higher efficiency in cotton farming. Within the context of falling water tables, educating farmers about the actual crop water requirements and guiding them about groundwater resource availability may also help to achieve higher efficiencies. © 2014 Society of Chemical Industry. © 2014 Society of Chemical Industry.

  12. Conceptual Design of a Space-Based Multimegawatt MHD Power System, Task 1 Topical Report; Volume 1: Technical Discussion

    DTIC Science & Technology

    1988-01-01

    system requirements, design guidelines, and interface requirements has been prepared and included as Volume II of this Task 1 topical report. The Volume ...WAESD-TR-88-0002 Conceptual Design Of A Space-Based Multimegawatt MHD Power System ffA«kjjjjjTfc Task 1 Topical Report Volume I: Technical...Space-Based Multimegawatt MHD Power System: Task 1 Topical Report, Volume I: Technical Discussion Personal Author: Dana, RA. Corporate Author Or

  13. NASA Risk Management Handbook. Version 1.0

    NASA Technical Reports Server (NTRS)

    Dezfuli, Homayoon; Benjamin, Allan; Everett, Christopher; Maggio, Gaspare; Stamatelatos, Michael; Youngblood, Robert; Guarro, Sergio; Rutledge, Peter; Sherrard, James; Smith, Curtis; hide

    2011-01-01

    The purpose of this handbook is to provide guidance for implementing the Risk Management (RM) requirements of NASA Procedural Requirements (NPR) document NPR 8000.4A, Agency Risk Management Procedural Requirements [1], with a specific focus on programs and projects, and applying to each level of the NASA organizational hierarchy as requirements flow down. This handbook supports RM application within the NASA systems engineering process, and is a complement to the guidance contained in NASA/SP-2007-6105, NASA Systems Engineering Handbook [2]. Specifically, this handbook provides guidance that is applicable to the common technical processes of Technical Risk Management and Decision Analysis established by NPR 7123.1A, NASA Systems Engineering Process and Requirements [3]. These processes are part of the \\Systems Engineering Engine. (Figure 1) that is used to drive the development of the system and associated work products to satisfy stakeholder expectations in all mission execution domains, including safety, technical, cost, and schedule. Like NPR 7123.1A, NPR 8000.4A is a discipline-oriented NPR that intersects with product-oriented NPRs such as NPR 7120.5D, NASA Space Flight Program and Project Management Requirements [4]; NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements [5]; and NPR 7120.8, NASA Research and Technology Program and Project Management Requirements [6]. In much the same way that the NASA Systems Engineering Handbook is intended to provide guidance on the implementation of NPR 7123.1A, this handbook is intended to provide guidance on the implementation of NPR 8000.4A. 1.2 Scope and Depth This handbook provides guidance for conducting RM in the context of NASA program and project life cycles, which produce derived requirements in accordance with existing systems engineering practices that flow down through the NASA organizational hierarchy. The guidance in this handbook is not meant to be prescriptive. Instead, it is meant to be general enough, and contain a sufficient diversity of examples, to enable the reader to adapt the methods as needed to the particular risk management issues that he or she faces. The handbook highlights major issues to consider when managing programs and projects in the presence of potentially significant uncertainty, so that the user is better able to recognize and avoid pitfalls that might otherwise be experienced.

  14. Technical requirements for bioassay support services

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hickman, D.P.; Anderson, A.L.

    1991-05-01

    This document provides the technical basis for the Chem-Nuclear Geotech (Geotech) bioassay program. It includes information and details that can be used as a model in providing technical contents and requirements for bioassay laboratory support, either internally or in solicitations by Geotech to obtain subcontractor laboratory support. It provides a detailed summary and description of the types of bioassay samples to be expected in support of Geotech remedial projects for the US Department of Energy and the bioassay services and analytical requirements necessary to process such samples, including required limits of sensitivity. General responsibilities of the bioassay laboratory are alsomore » addressed, including quality assurance. Peripheral information of importance to the program is included in the appendices of this document. 7 tabs.« less

  15. 47 CFR 15.611 - General technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 15.611 Section 15.611 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Access... shut-off procedure, by the use of a non-volatile memory, or some other method, to immediately restore...

  16. 47 CFR 22.383 - In-building radiation systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false In-building radiation systems. 22.383 Section... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.383 In-building radiation systems. Licensees may install and operate in-building radiation systems without applying for...

  17. 47 CFR 74.861 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBUTIONAL SERVICES Low Power Auxiliary Stations § 74.861 Technical requirements. (a) Transmitter power is the power at the transmitter output terminals and delivered... the purpose of this subpart, the transmitter power is the carrier power. (b) Each authorization for a...

  18. 76 FR 57060 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2011-D-0588] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal Products; Draft Guidance for Industry on Pharmacovigilance of Veterinary Medicinal Products: Electronic...

  19. EUV mask defect inspection and defect review strategies for EUV pilot line and high volume manufacturing

    NASA Astrophysics Data System (ADS)

    Chan, Y. David; Rastegar, Abbas; Yun, Henry; Putna, E. Steve; Wurm, Stefan

    2010-04-01

    Reducing mask blank and patterned mask defects is the number one challenge for extreme ultraviolet lithography. If the industry succeeds in reducing mask blank defects at the required rate of 10X every year for the next 2-3 years to meet high volume manufacturing defect requirements, new inspection and review tool capabilities will soon be needed to support this goal. This paper outlines the defect inspection and review tool technical requirements and suggests development plans to achieve pilot line readiness in 2011/12 and high volume manufacturing readiness in 2013. The technical specifications, tooling scenarios, and development plans were produced by a SEMATECH-led technical working group with broad industry participation from material suppliers, tool suppliers, mask houses, integrated device manufacturers, and consortia. The paper summarizes this technical working group's assessment of existing blank and mask inspection/review infrastructure capabilities to support pilot line introduction and outlines infrastructure development requirements and tooling strategies to support high volume manufacturing.

  20. A combined teamwork training and work standardisation intervention in operating theatres: controlled interrupted time series study.

    PubMed

    Morgan, Lauren; Pickering, Sharon P; Hadi, Mohammed; Robertson, Eleanor; New, Steve; Griffin, Damian; Collins, Gary; Rivero-Arias, Oliver; Catchpole, Ken; McCulloch, Peter

    2015-02-01

    Teamwork training and system standardisation have both been proposed to reduce error and harm in surgery. Since the approaches differ markedly, there is potential for synergy between them. Controlled interrupted time series with a 3 month intervention and observation phases before and after. Operating theatres conducting elective orthopaedic surgery in a single hospital system (UK Hospital Trust). Teamwork training based on crew resource management plus training and follow-up support in developing standardised operating procedures. Focus of subsequent standardisation efforts decided by theatre staff. Paired observers watched whole procedures together. We assessed non-technical skills using NOTECHS II, technical performance using glitch rate and compliance with WHO checklist using a simple quality tool. We measured complication and readmission rates and hospital stay using hospital administrative records. Before/after change was compared in the active and control groups using two-way ANOVA and regression models. 1121 patients were operated on before and 1100 after intervention. 44 operations were observed before and 50 afterwards. Non-technical skills (p=0.002) and WHO compliance (p<0.001) improved significantly after the intervention in the active versus the control group. Glitch count improved in both groups and there was no significant effect on clinical outcomes. Combined training in teamwork and system improvement causes marked improvements in team behaviour and WHO performance, but not technical performance or outcome. These findings are consistent with the synergistic hypothesis, but larger controlled studies with a strong implementation strategy are required to test potential outcome effects. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  1. Soft Skills: The New Curriculum for Hard-Core Technical Professionals

    ERIC Educational Resources Information Center

    Bancino, Randy; Zevalkink, Claire

    2007-01-01

    In this article, the authors talk about the importance of soft skills for hard-core technical professionals. In many technical professions, the complete focus of education and training is on technical topics either directly or indirectly related to a career or discipline. Students are generally required to master various mathematics skills,…

  2. 30 CFR 777.13 - Reporting of technical data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... descriptions of the methodology used to collect and analyze the data. (b) Technical analyses shall be planned... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reporting of technical data. 777.13 Section 777... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...

  3. 77 FR 65760 - Request for Public Comments To Compile the Reports on Sanitary and Phytosanitary and Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-30

    ... Technical Barriers to Trade (2012 TBT Report) respectively. The TPSC invites written comments from the... Reports on Sanitary and Phytosanitary and Technical Barriers to Trade AGENCY: Office of the United States... (USTR) is required to publish annually the Reports on Sanitary and Phytosanitary and Technical Barriers...

  4. 48 CFR 227.7103-10 - Contractor identification and marking of technical data to be furnished with restrictive markings.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and marking of technical data to be furnished with restrictive markings. 227.7103-10 Section 227.7103... DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-10 Contractor identification and marking of technical data to be furnished with restrictive markings...

  5. Characteristics and practices of National Immunisation Technical Advisory Groups in Europe and potential for collaboration, April 2014.

    PubMed

    Takla, A; Wichmann, O; Carrillo-Santisteve, P; Cotter, S; Levy-Bruhl, D; Paradowska-Stankiewicz, I; Valentiner-Branth, P; D'Ancona, F

    2015-03-05

    In many countries, national vaccination recommendations are developed by independent expert committees, so-called national immunisation technical advisory groups (NITAG). Since the evaluation of vaccines is complex and resource-demanding, collaboration between NITAGs that evaluate the same vaccines could be beneficial. We conducted a cross-sectional survey among 30 European countries in February 2014, to explore basic characteristics and current practices of European NITAGs and identify potential modes and barriers for collaboration. Of 28 responding countries, 26 reported to have a NITAG or an equivalent expert group. Of these, 20 apply a systematic approach in the vaccine decision-making process, e.g. by considering criteria such as country-specific disease epidemiology, vaccine efficacy/effectiveness/safety, health economics, programme implementation/logistics or country-specific values/preferences. However, applied frameworks and extent of evidence review differ widely. The use of systematic reviews is required for 15 of 26 NITAGs, while results from transmission modelling and health economic evaluations are routinely considered by 18 and 20 of 26 NITAGs, respectively. Twenty-five countries saw potential for NITAG-collaboration, but most often named structural concerns, e.g. different NITAG structures or countries’ healthcare systems. Our survey gathered information that can serve as an inventory on European NITAGs, allowing further exploration of options and structures for NITAG collaboration.

  6. NATO Scientific and Technical Information Service (NSTIS): functional description. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Molholm, K.N.; Blados, W.N.; Bulca, C.

    1987-08-01

    This report provides a functional description of the requirements for a NATO Scientific and Technical Information Service (NSTIS). The user requirements and much of the background information in this report were derived primarily from interviews with more than 60 NATO Headquarters staff members between 2 March and 25 March 1987. In addition, representatives of the Supreme Headquarters Applied Powers Europe (SHAPE) Technical Centre (STC), the Supreme Allied Commander Atlantic (Anti-Submarine Warfare Research) Centre (SACLANTCEN), the NATO Communications and Information Systems Agency (NACISA), The Advisory Group for Aerospace Research and Development (AGARD), the U.S. Defense Technical Information Center (DTIC), and themore » Technical Documentation Center for the Armed Forces in the Netherlands (TDCK), were interviewed, either in person or by telephone.« less

  7. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  8. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  9. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  10. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  11. 30 CFR 7.24 - Technical requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...

  12. 47 CFR 22.377 - Certification of transmitters.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.377 Certification of transmitters. Except as provided in paragraph (b) of this section, transmitters used in the Public Mobile... certificated when the station is ready for service, not necessarily at the time of filing an application. (a...

  13. A new generation of real-time DOS technology for mission-oriented system integration and operation

    NASA Technical Reports Server (NTRS)

    Jensen, E. Douglas

    1988-01-01

    Information is given on system integration and operation (SIO) requirements and a new generation of technical approaches for SIO. Real-time, distribution, survivability, and adaptability requirements and technical approaches are covered. An Alpha operating system program management overview is outlined.

  14. 47 CFR 22.357 - Emission types.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Emission types. 22.357 Section 22.357... Operational and Technical Requirements Technical Requirements § 22.357 Emission types. Any authorized station in the Public Mobile Services may transmit emissions of any type(s) that comply with the applicable...

  15. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  16. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  17. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  18. 10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...

  19. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for containers. 115.40...

  20. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for containers. 115.40...

  1. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for containers. 115.40...

  2. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for containers. 115.40...

  3. 19 CFR 115.40 - Technical requirements for containers.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for containers. 115.40...

  4. Estimating Renewable Energy Economic Potential in the United States. Methodology and Initial Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Austin; Beiter, Philipp; Heimiller, Donna

    This report describes a geospatial analysis method to estimate the economic potential of several renewable resources available for electricity generation in the United States. Economic potential, one measure of renewable generation potential, may be defined in several ways. For example, one definition might be expected revenues (based on local market prices) minus generation costs, considered over the expected lifetime of the generation asset. Another definition might be generation costs relative to a benchmark (e.g., a natural gas combined cycle plant) using assumptions of fuel prices, capital cost, and plant efficiency. Economic potential in this report is defined as the subsetmore » of the available resource technical potential where the cost required to generate the electricity (which determines the minimum revenue requirements for development of the resource) is below the revenue available in terms of displaced energy and displaced capacity. The assessment is conducted at a high geospatial resolution (more than 150,000 technology-specific sites in the continental United States) to capture the significant variation in local resource, costs, and revenue potential. This metric can be a useful screening factor for understanding the economic viability of renewable generation technologies at a specific location. In contrast to many common estimates of renewable energy potential, economic potential does not consider market dynamics, customer demand, or most policy drivers that may incent renewable energy generation.« less

  5. Supersonic variable-cycle engines

    NASA Technical Reports Server (NTRS)

    Willis, E. A.; Welliver, A. D.

    1976-01-01

    The evolution and current status of selected recent variable cycle engine (VCE) studies are reviewed, and how the results were influenced by airplane requirements is described. Promising VCE concepts are described, their designs are simplified and the potential benefits in terms of aircraft performance are identified. This includes range, noise, emissions, and the time and effort it may require to ensure technical readiness of sufficient depth to satisfy reasonable economic, performance, and environmental constraints. A brief overview of closely related, ongoing technology programs in acoustics and exhaust emissions is also presented. Realistic technology advancements in critical areas combined with well matched aircraft and selected VCE concepts can lead to significantly improved economic and environmental performance relative to first generation SST predictions.

  6. 48 CFR 227.7103-3 - Early identification of technical data to be furnished to the Government with restrictions on use...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... technical data to be furnished to the Government with restrictions on use, reproduction or disclosure. 227..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-3 Early identification of technical data to be furnished to the Government with restrictions...

  7. 48 CFR 227.7103-3 - Early identification of technical data to be furnished to the Government with restrictions on use...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... technical data to be furnished to the Government with restrictions on use, reproduction or disclosure. 227..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-3 Early identification of technical data to be furnished to the Government with restrictions...

  8. 48 CFR 227.7103-3 - Early identification of technical data to be furnished to the Government with restrictions on use...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... technical data to be furnished to the Government with restrictions on use, reproduction or disclosure. 227..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-3 Early identification of technical data to be furnished to the Government with restrictions...

  9. Communication Requirements of Employees of Business and Industry Represented by Areas of Technological Study at Southern Maine Vocational Technical Institute.

    ERIC Educational Resources Information Center

    Cary, Penny J.; Sweeney, Kevin F.

    A study examined the need and demand for communication skills for employees in the technical fields for which Southern Maine Vocational Technical Institute offers programs of academic preparation. Two members of the Institute's English Department interviewed representatives of organizations that have hired technical program graduates. Further…

  10. 78 FR 52963 - 60-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY...: HUD is seeking approval from the Office of Management and Budget (OMB) for the information collection... interested parties on the proposed collection of information. The purpose of this notice is to allow for 60...

  11. High School Graduation Minimum Competency Requirements. Final Technical Report.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    This technical report details the testing results and analyses supporting the evaluation findings related to the Austin (Texas) Independent School District (AISD) minimum competency graduation requirements. The graduation competency status of all AISD students in grades 8 to 12 are documented. The report provides additional information on the data…

  12. Build It and They Will Come: Addressing the Problem of Declining Entry-Level Skills.

    ERIC Educational Resources Information Center

    Koontz, Paul

    2000-01-01

    The growing gap between the skills of the work force and the technical requirements of today's jobs have reemphasized the need to transform the educational system to provide the solid academic and technical skills required by the jobs of today and tomorrow. (Author)

  13. Vocational-Technical Marine Career Opportunities in Texas.

    ERIC Educational Resources Information Center

    Hollin, Dewayne

    Presented are background information and descriptions of jobs in various Texas marine industries, as well as a summary of the training required for particular positions. Since the emphasis is upon vocational-technical training for immediate job placement, most opportunities discussed require a high school diploma and some on-the-job education.…

  14. A Technical Evaluation of the First Stage of the Mediterranean Regional Project.

    ERIC Educational Resources Information Center

    Hollister, Robinson

    Objectives of this technical evaluation concerning the transfer of experience in the development of human resources were to develop educational plans based upon comprehensive estimates of manpower requirements and to evaluate the methods used in estimating manpower requirements for educational planning. The methodology involved estimates of the…

  15. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  16. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  17. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  18. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  19. 47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  20. 77 FR 58421 - Model Safety Evaluation for Plant-Specific Adoption of Technical Specifications Task Force...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... Ventilation System Surveillance Requirements To Operate for 10 Hours per Month,'' Using the Consolidated Line... currently require operating the ventilation system for at least 10 continuous hours with the heaters... Technical Specifications (TSs) Task Force (TSTF) Traveler TSTF-522, Revision 0, ``Revise Ventilation System...

  1. 77 FR 16869 - Proposed Models for Plant-Specific Adoption of Technical Specifications Task Force Traveler TSTF...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ... Ventilation System Surveillance Requirements to Operate for 10 hours per Month.'' DATES: Comment period....1, which currently require operating the heaters in the respective systems for at least 10... Adoption of Technical Specifications Task Force Traveler TSTF-522, Revision 0, ``Revise Ventilation System...

  2. 77 FR 58301 - Technical Amendment; Airworthiness Standards: Aircraft Engines; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... technical amendment, the FAA clarified aircraft engine vibration test requirements in the airworthiness... amendment, the FAA intended to clarify vibration test requirements in Sec. 33.83 of 14 Code of Federal... read as follows: Sec. 33.83 Vibration test. (a) Each engine must undergo vibration surveys to establish...

  3. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  4. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  5. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  6. 77 FR 58871 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ... action to submit an information collection request to the Office of Management and Budget (OMB) and... ensuring that their vendors meet applicable regulations and requirements, both technical and quality, in..., the NRC inspects vendors to evaluate their conformance with technical and quality requirements in part...

  7. 47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...

  8. 76 FR 57058 - International Cooperation on Harmonisation of Technical Requirements for Registration of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0165] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal Products; Guidance for Industry on Studies To Evaluate the Metabolism and Residue Kinetics of Veterinary...

  9. 30 CFR 7.44 - Technical requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.44 Technical requirements. (a)(1) Battery boxes and covers constructed of AISI 1010 hot rolled steel shall have the following minimum thicknesses based on the total weight of a unit of the battery assembly charged and ready...

  10. 30 CFR 7.44 - Technical requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.44 Technical requirements. (a)(1) Battery boxes and covers constructed of AISI 1010 hot rolled steel shall have the following minimum thicknesses based on the total weight of a unit of the battery assembly charged and ready...

  11. 48 CFR 37.115-2 - General policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... degrade the level of technical expertise required to fulfill the Government's requirements (see 15.305 for competitive negotiations and 15.404-1(d) for cost realism analysis). When acquiring these services... skill levels and its use in key technical positions. [62 FR 44815, Aug. 22, 1997, as amended at 64 FR...

  12. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  13. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  14. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  15. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  16. 47 CFR 76.1608 - System technical integration requiring uniform election of must-carry or retransmission consent...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...

  17. Recent Advances in Microbial Single Cell Genomics Technology and Applications

    NASA Astrophysics Data System (ADS)

    Stepanauskas, R.

    2016-02-01

    Single cell genomics is increasingly utilized as a powerful tool to decipher the metabolic potential, evolutionary histories and in situ interactions of environmental microorganisms. This transformative technology recovers extensive information from cultivation-unbiased samples of individual, unicellular organisms. Thus, it does not require data binning into arbitrary phylogenetic or functional groups and therefore is highly compatible with agent-based modeling approaches. I will present several technological advances in this field, which significantly improve genomic data recovery from individual cells and provide direct linkages between cell's genomic and phenotypic properties. I will also demonstrate how these new technical capabilities help understanding the metabolic potential and viral infections of the "microbial dark matter" inhabiting aquatic and subsurface environments.

  18. Low/medium-Btu coal-gasification feasibility study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-11-01

    This study examines the feasibility of applying the concepts of Coal Gasification and Combined Cycle Technology to the re-powering of existing steam turbine-electric generating facilities. The primary objectives of this study include: (1) the determination of the feasibility of designing a technically sound system embodying this technology; (2) the determination of the potential for displacing foreign oil by the project; (3) the identificaton of any constraints and/or barriers that might impede the accomplishment of such a project; and (4) the evaluation of the potential benefits of such a system. Although the system is designed around the use of commercially available,more » state-of-the-art components and equipment, a completely integrated, electric generating plant, such as is being proposed here, has not yet been demonstrated. However, the designs developed as part of this study combine these components, utilizing well developed and technically sound concepts in such a way as to provide a reasonable degree of confidence in the workability of the total system. This study offers the potential for reducing oil dependency; the possibility of improving cycle efficiency and extending the useful life of existing facilities; the feasibility of re-vitalizing a facility located within a major load center; and presents some attractive possibilities for a co-generation, district heating application in the central portions of Bridgeport. Although the results of the study produce a number of clear conclusions, they also stimulate additional questions, the resolution of which would require further study and more detailed design. The final resolution of these questions that still remain may have a significant effect on the final conclusions concerning the viability of this project, and it is for this reason that further study is required.« less

  19. 75 FR 41433 - Trade Adjustment Assistance for Farmers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ...-210). Individual asparagus producers, nationwide, interested in applying for technical training and..., producers may receive technical assistance provided at no cost and may receive cash benefits, if the applicable program eligibility requirements are satisfied. Applicants must complete the technical assistance...

  20. 75 FR 41431 - Trade Adjustment Assistance for Farmers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    .... 107-210). Individual catfish producers, nationwide, interested in applying for technical training and..., producers may receive technical assistance at no cost and may receive cash benefits, if the applicable program eligibility requirements are satisfied. Applicants must complete the technical assistance under...

Top