Sample records for power act proposing

  1. 77 FR 66978 - Proposed Consent Decree, Clean Air Act Citizen Suit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9750-5] Proposed Consent Decree, Clean Air Act Citizen Suit... public comment. SUMMARY: In accordance with section 113(g) of the Clean Air Act, as amended (``CAA... 5 Generating Plant, a power plant located in Milam County, Texas. Under the proposed consent decree...

  2. 78 FR 38851 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... 215 of the Federal Power Act, the Commission proposes to approve the retirement of 34 requirements... of the Reliability Standards. In addition, the Commission proposes to withdraw 41 outstanding...-Power System. This proposal is part of the Commission's ongoing effort to review its requirements and...

  3. 18 CFR 4.34 - Hearings on applications; consultation on terms and conditions; motions to intervene; alternative...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... habitat). Pursuant to the Federal Power Act and the Endangered Species Act, the Commission will consult... Power Act, in their initial comments filed with the Commission by the date specified in paragraph (b) of..., concerning the impact of a hydropower proposal on endangered or threatened species and their critical habitat...

  4. 77 FR 66966 - Fiscal Year (FY) 2014-2015 Proposed Power and Transmission Rate Adjustments; Public Hearing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... and Procedural Background Section 7(i) of the Northwest Power Act, 16 U.S.C. 839e(i), requires that... and constituents before the final program levels are incorporated into the final rates. C. Rate Case... 5(c) of the Northwest Power Act established the Residential Exchange Program, which provides...

  5. 18 CFR 385.1505 - Determination of proposed penalty amount (Rule 1505).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Determination of proposed penalty amount (Rule 1505). 385.1505 Section 385.1505 Conservation of Power and Water Resources... PROCEDURE Procedures for the Assessment of Civil Penalties Under Section 31 of the Federal Power Act § 385...

  6. Audit of the proposed sale of Alaska Power Administration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-16

    The Department of Energy (Department) has proposed selling the Alaska Power Administration (APA) to the state of Alaska and local utility purchasers. In early 1992 Congress received the Department's current proposed sale legislation. The objective of this audit was to determine whether the terms of the proposed sale of APA would protect the financial interests of the US taxpayers. The audit showed that issues raised by the General Accounting Office (GAO) as late as 1990 and in prior years remain relevant to the current consideration of the sale of APA. Further, we found that a decision had been made tomore » dispose of APA without following the requirements of the Property Act. We pointed out to the Department in informal conversations that the proposed sale appeared subject to the provisions of the Property Act. Subsequently, the Department modified its draft legislative proposal to include language designed to exclude the sale from the requirements of the Property Act. Due to divergent opinions regarding the proposed sale of APA, we believe the Department should fully inform the Congress, during its deliberative process, as to the issues raised above.« less

  7. Legislation Seeks to Protect Power Grid From Space Weather

    NASA Astrophysics Data System (ADS)

    Tretkoff, Ernie

    2010-05-01

    Proposed legislation would help protect the U.S. power grid against space weather and other threats. The Grid Reliability and Infrastructure Defense Act (GRID Act) would give the Federal Energy Regulatory Commission (FERC) authority to develop and enforce standards for power companies to protect the electric grid from geomagnetic storms and threats such as a terrorist attack using electromagnetic pulse (EMP) weapons. The act unanimously passed the U.S. House Committee on Energy and Commerce in April and will proceed to a vote in the full House of Representatives.

  8. 77 FR 67360 - Igiugig Village Council; Notice of Successive Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Igiugig RISEC Water Power Project (Igiugig Project or project), to... proposed transmission line that will either connect directly to the IVC diesel power plant or a 1,000-foot...

  9. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    ... high-voltage transmission system carries electricity from 57 power plants encompassing 14 multi-purpose... DEPARTMENT OF ENERGY Southwestern Power Administration Western Area Power Administration Request... Act of 2005 AGENCY: Southwestern Power Administration and Western Area Power Administration...

  10. Think global, act local—a power generation case study

    NASA Astrophysics Data System (ADS)

    Dugdale, Pam

    2012-01-01

    This paper describes an exercise completed by sixth form college students to compare the power output from a local coal fired power station with the potential power output from renewable sources including wind farms, solar farms, and the proposed Mersey Tidal Barrage scheme.

  11. Audit of the proposed sale of Alaska Power Administration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-16

    The Department of Energy (Department) has proposed selling the Alaska Power Administration (APA) to the state of Alaska and local utility purchasers. In early 1992 Congress received the Department`s current proposed sale legislation. The objective of this audit was to determine whether the terms of the proposed sale of APA would protect the financial interests of the US taxpayers. The audit showed that issues raised by the General Accounting Office (GAO) as late as 1990 and in prior years remain relevant to the current consideration of the sale of APA. Further, we found that a decision had been made tomore » dispose of APA without following the requirements of the Property Act. We pointed out to the Department in informal conversations that the proposed sale appeared subject to the provisions of the Property Act. Subsequently, the Department modified its draft legislative proposal to include language designed to exclude the sale from the requirements of the Property Act. Due to divergent opinions regarding the proposed sale of APA, we believe the Department should fully inform the Congress, during its deliberative process, as to the issues raised above.« less

  12. 18 CFR 131.80 - FERC Form No. 556, Certification of qualifying facility status for an existing or a proposed...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false FERC Form No. 556... COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, FEDERAL POWER ACT AND PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 FORMS § 131.80 FERC Form No. 556, Certification of qualifying facility status for an existing...

  13. 77 FR 58988 - Shearwater Design, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Homeowner Tidal Power Electric Generation Project to be located in.... The proposed project would consist of: (1) 10 hydrokinetic turbine units with an estimated total...

  14. Think Global, Act Local--A Power Generation Case Study

    ERIC Educational Resources Information Center

    Dugdale, Pam

    2012-01-01

    This paper describes an exercise completed by sixth form college students to compare the power output from a local coal fired power station with the potential power output from renewable sources including wind farms, solar farms, and the proposed Mersey Tidal Barrage scheme. (Contains 1 figure, 1 table, and 3 photos.)

  15. 75 FR 12533 - The Power Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13646-000] The Power..., Motions To Intervene, and Competing Applications March 9, 2010. On December 21, 2009, The Power Company, Inc. filed an application, pursuant to Section 4(f) of the Federal Power Act, proposing to study the...

  16. 76 FR 16394 - Analysis of Horizontal Market Power Under the Federal Power Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... comment on whether, and if so, how, the Commission should revise its approach for examining horizontal... approach for examining horizontal market power concerns in transactions under Sec. 203 of the Federal Power... Commission to approve a proposed disposition, consolidation, acquisition, or change in control if it finds...

  17. 77 FR 6556 - Birch Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13102-000] Birch Power... Intervene, and Competing Applications On December 1, 2011, Birch Power Company filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the...

  18. Does power corrupt or enable? When and why power facilitates self-interested behavior.

    PubMed

    DeCelles, Katherine A; DeRue, D Scott; Margolis, Joshua D; Ceranic, Tara L

    2012-05-01

    Does power corrupt a moral identity, or does it enable a moral identity to emerge? Drawing from the power literature, we propose that the psychological experience of power, although often associated with promoting self-interest, is associated with greater self-interest only in the presence of a weak moral identity. Furthermore, we propose that the psychological experience of power is associated with less self-interest in the presence of a strong moral identity. Across a field survey of working adults and in a lab experiment, individuals with a strong moral identity were less likely to act in self-interest, yet individuals with a weak moral identity were more likely to act in self-interest, when subjectively experiencing power. Finally, we predict and demonstrate an explanatory mechanism behind this effect: The psychological experience of power enhances moral awareness among those with a strong moral identity, yet decreases the moral awareness among those with a weak moral identity. In turn, individuals' moral awareness affects how they behave in relation to their self-interest. (PsycINFO Database Record (c) 2012 APA, all rights reserved).

  19. 75 FR 78236 - Pennamaquan Tidal Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... Tidal Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications December 8, 2010. On November 22, 2010, Pennamaquan Tidal... Act (FPA), proposing to study the feasibility of the Pennamaquan Tidal Power Plant Project to be...

  20. 75 FR 45607 - Application To Export Electric Energy; Manitoba Hydro

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... that the proposed action will not adversely impact on the reliability of the U.S. electric power supply... United States to Canada pursuant to section 202(e) of the Federal Power Act (FPA). DATES: Comments... electric energy from the United States to Canada as a power marketer using existing international...

  1. 77 FR 11515 - Application to Export Electric Energy; NRG Power Marketing LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-384] Application to Export Electric Energy; NRG Power... electric energy from the United States to Mexico pursuant to section 202(e) of the Federal Power Act (FPA... requested. The electric energy that NRGPML proposes to export to Mexico would be surplus energy purchased...

  2. 77 FR 39737 - Notice of Lodging of Proposed Consent Decree With Dairyland Power Cooperative Under the Clean Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... Cooperative Under the Clean Air Act Pursuant to 28 CFR 50.7, notice is hereby given that on June 28, 2012, a... Wisconsin. In this civil enforcement action under the federal Clean Air Act (``Act''), the United States... intended to protect air quality. The complaint alleges that Dairyland violated the Prevention of...

  3. 75 FR 24941 - Osprey III, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... Central Maine Power distribution line located in the Town of Hartland; and (5) appurtenant facilities. The... application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the...

  4. 76 FR 80385 - Draft Environmental Impact Statement and Proposed Maricopa Sun Solar Complex Multi-Species...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ...-FXES11120800000F2-123] Draft Environmental Impact Statement and Proposed Maricopa Sun Solar Complex Multi-Species... National Environmental Policy Act for the proposed Maricopa Sun Solar Complex Habitat Conservation Plan... construction, operation, and decommissioning of a 700 megawatt photo-voltaic power generating facility and...

  5. 77 FR 64822 - Notice of Submission of Proposed Information Collection to OMB; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... public comments on the subject proposal. Under the Single Family Mortgage Foreclsoure Act of 1994, HUD may exercise a nonjudicial Power of Sale of single family HUD-held mortgages and may appoint... Proposed Information Collection to OMB; Notice of Application for Designation as a Single Family...

  6. 75 FR 24942 - Osprey I, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... kilowatts (kW); (5) a new transmission line connecting to an existing Central Maine Power distribution line..., pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the New Mills Dam...

  7. 77 FR 133 - In the Matter of Connecticut Yankee Atomic Power Company; Northeast Utilities; NSTAR (Haddam Neck...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... the Matter of Connecticut Yankee Atomic Power Company; Northeast Utilities; NSTAR (Haddam Neck Plant); Order Approving Application Regarding Proposed Merger I Connecticut Yankee Atomic Power Company..., pursuant to Section 184 of the Atomic Energy Act of 1954, as amended (AEA), and Title 10 of the Code of...

  8. 75 FR 78979 - Application to Export Electric Energy; Twin Rivers Paper Company Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    .... Twin Rivers has requested an export authorization in order to be able to supply emergency power as... proposed action will not adversely impact on the reliability of the U.S. electric power supply system... electric energy from the United States to Canada pursuant to section 202(e) of the Federal Power Act. DATES...

  9. 76 FR 27342 - Central Utah Project Completion Act; Notice of Intent To Accept Proposals, Select a Potential...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... DEPARTMENT OF THE INTERIOR Central Utah Project Completion Act; Notice of Intent To Accept... Interior. ACTION: Notice. SUMMARY: Current Federal policy encourages non-Federal development of... Interior (Interior), in consultation with the Department of Energy, Western Area Power Administration...

  10. The Proposed 2009 War Powers Consultation Act

    DTIC Science & Technology

    2009-03-19

    both political branches of government participate in matters of national security. 15. SUBJECT TERMS Separation of Powers , National Security Law...Strategy Research Project DATE: 19 March 2009 WORD COUNT: 8,090 PAGES: 46 KEY TERMS: Separation of Powers , National Security Law, Constitution...Arthur Bestor, “ Separation of Powers in the Domain of Foreign Affairs: The Intent of the Constitution Historically Examined,” Seton Hall L. Rev. 5 (1974

  11. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  12. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  13. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  14. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT RULES CONCERNING... interruption as it transitions from one method of funding to another. Any proposed transitional funding plan...

  15. An accuracy aware low power wireless EEG unit with information content based adaptive data compression.

    PubMed

    Tolbert, Jeremy R; Kabali, Pratik; Brar, Simeranjit; Mukhopadhyay, Saibal

    2009-01-01

    We present a digital system for adaptive data compression for low power wireless transmission of Electroencephalography (EEG) data. The proposed system acts as a base-band processor between the EEG analog-to-digital front-end and RF transceiver. It performs a real-time accuracy energy trade-off for multi-channel EEG signal transmission by controlling the volume of transmitted data. We propose a multi-core digital signal processor for on-chip processing of EEG signals, to detect signal information of each channel and perform real-time adaptive compression. Our analysis shows that the proposed approach can provide significant savings in transmitter power with minimal impact on the overall signal accuracy.

  16. 18 CFR 16.15 - Commission recommendation to Congress.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... recommendation to Congress. 16.15 Section 16.15 Conservation of Power and Water Resources FEDERAL ENERGY... 15 of the Federal Power Act § 16.15 Commission recommendation to Congress. Upon receipt of a recommendation from any Federal department or agency, a proposal of any party, or on the Commission's own motion...

  17. 18 CFR 16.15 - Commission recommendation to Congress.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... recommendation to Congress. 16.15 Section 16.15 Conservation of Power and Water Resources FEDERAL ENERGY... 15 of the Federal Power Act § 16.15 Commission recommendation to Congress. Upon receipt of a recommendation from any Federal department or agency, a proposal of any party, or on the Commission's own motion...

  18. 77 FR 70780 - Agency Forms Undergoing Paperwork Reduction Act Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... requirements or power calculations that justify the proposed sample size, the expected response rate, methods... notice. Proposed Project Generic Clearance for the Collection of Qualitative Feedback on Agency Service... Collection of Qualitative Feedback on Agency Service Delivery'' to OMB for approval under the Paperwork...

  19. Designing PURPA (Public Utilities Regulatory Policies Act) power purchase auctions: Theory and practice. [Buys from cogenerators and small power generators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Public Utilities Regulatory Act (PURPA) requires there to be procedures for electric utilities to buy electric power from qualifying cogenerators and small power producers (QFs) at rates up to ''avoided cost''. This has led to price-posting procedures at prices calculated as the utility's marginal cost. Unexpectedly large sales at these prices and slow adjustment to falling energy cost are partially responsible for payments to QFs in excess of the utility's true avoided cost. Using competitive bidding instead of posted prices has been proposed as a way to avoid this outcome. This report reviews bidding theory and explores four issuesmore » that arise in designing auction systems for the purchase of power from QFs under PURPA.« less

  20. Characterization of simple wireless neurostimulators and sensors.

    PubMed

    Gulick, Daniel W; Towe, Bruce C

    2014-01-01

    A single diode with a wireless power source and electrodes can act as an implantable stimulator or sensor. We have built such devices using RF and ultrasound power coupling. These simple devices could drastically reduce the size, weight, and cost of implants for applications where efficiency is not critical. However, a shortcoming has been a lack of control: any movement of the external power source would change the power coupling, thereby changing the stimulation current or modulating the sensor response. To correct for changes in power and signal coupling, we propose to use harmonic signals from the device. The diode acts as a frequency multiplier, and the harmonics it emits contain information about the drive level and bias. A simplified model suggests that estimation of power, electrode bias, and electrode resistance is possible from information contained in radiated harmonics even in the presence of significant noise. We also built a simple RF-powered stimulator with an onboard voltage limiter.

  1. 76 FR 23536 - Agency Information Collection Activities: Proposed Collection; Comment Request; Generic Clearance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... requirements or power calculations that justify the proposed sample size, the expected response rate, methods... Qualitative Feedback on Agency Service Delivery April 22, 2011. AGENCY: Department of Agriculture (USDA... Qualitative Feedback on Agency Service Delivery'' to OMB for approval under the Paperwork Reduction Act (PRA...

  2. 76 FR 10939 - Agency Information Collection Activities: Proposed Collection; Comment Request; Generic Clearance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... requirements or power calculations that justify the proposed sample size, the expected response rate, methods... of Qualitative Feedback on Agency Service Delivery AGENCY: Federal Railroad Administration (FRA... Qualitative Feedback on Agency Service Delivery'' to OMB for approval under the Paperwork Reduction Act (PRA...

  3. 78 FR 44099 - Agency Information Collection Activities: Proposed Collection; Comment Request; Generic Clearance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... requirements or power calculations that justify the proposed sample size, the expected response rate, methods... Collection; Comment Request; Generic Clearance for the Collection of Qualitative Feedback on Agency Service... Qualitative Feedback on Agency Service Delivery'' for approval under the Paperwork Reduction Act (PRA) (44 U.S...

  4. 76 FR 31383 - Agency Information Collection Activities: Proposed Collection; Comment Request; Generic Clearance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... requirements or power calculations that justify the proposed sample size, the expected response rate, methods...; Generic Clearance for the Collection of Qualitative Feedback on Agency Service Delivery AGENCY: Peace... Qualitative Feedback on Agency Service Delivery '' to OMB for approval under the Paperwork Reduction Act (PRA...

  5. 76 FR 43230 - National Pollutant Discharge Elimination System-Cooling Water Intake Structures at Existing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... Facilities and Phase I Facilities AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule...) of the Clean Water Act for all existing power generating facilities and existing manufacturing and industrial facilities. EPA requested that public comments on the proposal be submitted on or before July 19...

  6. 75 FR 78984 - South Run Pumped Storage, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... with the project. Applicant Contact: Daniel R. Irvin, Free Flow Power Corporation, 33 Commercial Street... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13876-000] South Run Pumped... the Federal Power Act (FPA), proposing to study the feasibility of the South Run Pumped Storage...

  7. 78 FR 51186 - Proposed Consent Decree, Clean Air Act Citizen Suit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    ... Houston, California Communities Against Toxics, Coalition For A Safe Environment, Community In-Power and Development Association, Del Amo Action Committee, Environmental Integrity Project, Louisiana Bucket Brigade...

  8. 75 FR 15427 - Notice of Intent To Prepare an Environmental Impact Statement/Staff Assessment for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... Management Notice of Intent To Prepare an Environmental Impact Statement/ Staff Assessment for the Proposed... Land Use Plan Amendments AGENCY: Western Area Power Administration, DOE; Bureau of Land Management, DOI... Land Policy and Management Act of 1976 (FLPMA), as amended, and the California Environmental Quality...

  9. 76 FR 49237 - Energy Conservation Program: Test Procedures for Residential Clothes Washers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ...In this supplemental notice of proposed rulemaking (SNOPR), the U.S. Department of Energy (DOE) proposes to revise its test procedure for residential clothes washers established under the Energy Policy and Conservation Act (EPCA). DOE proposes to incorporate provisions of the International Electrotechnical Commission (IEC) Standard 62301, ``Household electrical appliances--Measurement of standby power'' (Second Edition). DOE also proposes to update the provisions for measuring active mode energy and water consumption.

  10. Designing PURPA (Public Utilities Regulatory Act) power purchase auctions: Theory and practice. [Cogenerated electricity purchasing model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rothkopf, M.H.; Kahn, E.P.; Teisberg, T.J.

    The Public Utilities Regulatory Act (PURPA) requires there to be procedures for electric utilities to buy electric power from qualifying cogenerators and small power producers (QFs) at rates up to ''avoided cost.'' This has led to price-posting procedures at prices calculated as the utility's marginal cost. Unexpectedly large sales at these prices and slow adjustment to falling energy cost are partially responsible for payments to QFs in excess of the utility's true avoided cost. Using competitive bidding instead of posted prices has been proposed as a way to avoid this outcome. This report reviews bidding theory and explores four issuesmore » that arise in deisigning auction systems for the purchase of power from QFs under PURPA. 77 refs., 6 figs., 15 tabs.« less

  11. Coercive Power of the Federal Purse

    ERIC Educational Resources Information Center

    Brewster, Kingman

    1975-01-01

    Cites examples of use of the leverage of the government dollar to manipulate for vindictive or political purposes. Examples include the proposed health manpower legislation and the Family Educational Rights and Privacy Act. (GS)

  12. 18 CFR 349.1 - Notice to audited person.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Notice to audited person. 349.1 Section 349.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE INTERSTATE COMMERCE ACT DISPOSITION OF CONTESTED AUDIT FINDINGS AND PROPOSED REMEDIES § 349.1 Notice to...

  13. Teacher Activism in Response to North Carolina's 2013 Excellent Public Schools Act

    ERIC Educational Resources Information Center

    Cox, Courtnee Danielle

    2017-01-01

    In 2013, North Carolina's political power balances shifted with the election of a Republican governor, Pat McCrory, and a Republican super-majority in the General Assembly. This shift in political power allowed for more conservative legislation to be introduced in the North Carolina General Assembly. Some of the newly proposed legislation,…

  14. 75 FR 61747 - Coffin Butte Energy Park, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Power Act (FPA), proposing to study the feasibility of the Coffin Butte Pumped Storage Water Power... triangular earth and roller compacted concrete embankment; creating a 50-acre upper reservoir with a storage...); (2) a 6,300-foot-long, 60-foot-high oval earth and roller compacted concrete embankment; creating a...

  15. Does Powerlessness Explain the Relationship between Intimate Partner Violence and Depression?

    ERIC Educational Resources Information Center

    Filson, Jennifer; Ulloa, Emilio; Runfola, Cristin; Hokoda, Audrey

    2010-01-01

    The current study aimed to test whether relationship power could act as a mediator of the relationship between intimate partner violence and depression. The proposed mediation model was based on the theory of gender and power and on previous research of intimate partner violence and depression. Survey results from a sample of 327 single…

  16. A Combined Energy Management Algorithm for Wind Turbine/Battery Hybrid System

    NASA Astrophysics Data System (ADS)

    Altin, Necmi; Eyimaya, Süleyman Emre

    2018-03-01

    From an energy management standpoint, natural phenomena such as solar irradiation and wind speed are uncontrolled variables, so the correlation between the energy generated by renewable energy sources and energy demand cannot always be predicted. For this reason, energy storage systems are used to provide more efficient renewable energy systems. In these systems, energy management systems are used to control the energy storage system and establish a balance between the generated power and the power demand. In addition, especially in wind turbines, rapidly varying wind speeds cause wind power fluctuations, which threaten the power system stability, especially at high power levels. Energy storage systems are also used to mitigate the power fluctuations and sustain the power system's stability. In these systems, another controller which controls the energy storage system power to mitigate power fluctuations is required. These two controllers are different from each other. In this study, a combined energy management algorithm is proposed which can perform both as an energy control system and a power fluctuation mitigation system. The proposed controller is tested with wind energy conversion system modeled in MATLAB/Simulink. Simulation results show that the proposed controller acts as an energy management system while, at the same time, mitigating power fluctuations.

  17. Energy Market and Economic Impacts of the Carbon Limits and Energy for America’s Renewal (CLEAR) Act and an Electric-Power Only Cap-and-Trade Program

    EIA Publications

    2010-01-01

    This paper responds to a request from Senators Bingaman, Cantwell, Collins, Murkowski and Voinovich to the U.S. Energy Information Administration (EIA) to provide technical assistance to help inform deliberations on energy and climate legislation, including an evaluation of the Carbon Limits and Energy for America’s Renewal (CLEAR) Act and several possible variants of that legislation (some of which had quite extensive components), as well as a separate electric power sector only cap and trade (EPOCT) proposal.

  18. 76 FR 21891 - Seneca Nation of Indians; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to... total installed capacity of 32,000 kilowatts, (2) a proposed 4,500-foot-long, 230-kilovolt transmission...: yo' Way, Salamanca, NY 14779; phone (716) 945-1790. FERC Contact: Timothy Looney; phone: (202) 502...

  19. 77 FR 60429 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Services, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Fisher's Island Tidal Energy Project, which would be located on the Long Island...' express permission. The proposed project would consist of: (1) Installation of 50 NC Sea Dragon tidal...

  20. 2007 Wholesale Power Rate Case Initial Proposal : Wholesale Power Rate Development Study.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    The Wholesale Power Rate Development Study (WPRDS) calculates BPA proposed rates based on information either developed in the WPRDS or supplied by the other studies that comprise the BPA rate proposal. All of these studies, and accompanying documentation, provide the details of computations and assumptions. In general, information about loads and resources is provided by the Load Resource Study (LRS), WP-07-E-BPA-01, and the LRS Documentation, WP-07-E-BPA-01A. Revenue requirements information, as well as the Planned Net Revenues for Risk (PNNR), is provided in the Revenue Requirement Study, WP-07-E-BPA-02, and its accompanying Revenue Requirement Study Documentation, WP-07-E-BPA-02A and WP-07-E-BPA-02B. The Market Pricemore » Forecast Study (MPFS), WP-07-E-BPA-03, and the MPFS Documentation, WP-07-E-BPA-03A, provide the WPRDS with information regarding seasonal and diurnal differentiation of energy rates, as well information regarding monthly market prices for Demand Rates. In addition, this study provides information for the pricing of unbundled power products. The Risk Analysis Study, WP-07-E-BPA-04, and the Risk Analysis Study Documentation, WP-07-E-BPA-04A, provide short-term balancing purchases as well as secondary energy sales and revenue. The Section 7(b)(2) Rate Test Study, WP-07-E-BPA-06, and the Section 7(b)(2) Rate Test Study Documentation, WP-07-E-BPA-06A, implement Section 7(b)(2) of the Northwest Power Act to ensure that BPA preference customers firm power rates applied to their general requirements are no higher than rates calculated using specific assumptions in the Northwest Power Act.« less

  1. 76 FR 73614 - Lock 14 Hydro Partners; FFP Project 106 LLC; Notice of Competing Preliminary Permit Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... applications, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of a... directed by the Corps. Applicant Contact: Mr. David Brown Kinloch, Soft Energy Associates, 414 S. Wenzel... Swaminathan, Free Flow Power Corp., 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283-2822. FERC...

  2. 76 FR 73616 - Lock 12 Hydro Partners; FFP Project 107 LLC; Notice of Competing Preliminary Permit Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... applications, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of a... Lock and Dam No. 12, as directed by the Corps. Applicant Contact: Mr. David Brown Kinloch, Soft Energy.... Ramya Swaminathan, Free Flow Power Corp., 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283...

  3. 78 FR 42555 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... (NPPs), electric power companies, and any person eligible under the Atomic Energy Act to apply for ESPs... or other forms of information technology? The public may examine and have copied for a fee publicly...

  4. A Novel Control Strategy for Autonomous Operation of Isolated Microgrid with Prioritized Loads

    NASA Astrophysics Data System (ADS)

    Kumar, R. Hari; Ushakumari, S.

    2018-05-01

    Maintenance of power balance between generation and demand is one of the most critical requirements for the stable operation of a power system network. To mitigate the power imbalance during the occurrence of any disturbance in the system, fast acting algorithms are inevitable. This paper proposes a novel algorithm for load shedding and network reconfiguration in an isolated microgrid with prioritized loads and multiple islands, which will help to quickly restore the system in the event of a fault. The performance of the proposed algorithm is enhanced using genetic algorithm and its effectiveness is illustrated with simulation results on modified Consortium for Electric Reliability Technology Solutions (CERTS) microgrid.

  5. Communication enabled – fast acting imbalance reserve (CE-FAIR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilches-Bernal, Felipe; Concepcion, Ricky; Neely, Jason C.

    This letter presents a new frequency control strategy that takes advantage of communications and fast responding resources like PV generation, energy storage, wind generation, and demand response, termed collectively as converter interfaced generators (CIGs). The proposed approach uses an active monitoring of power imbalances to rapidly redispatch CIGs. This approach differs from previously proposed frequency control schemes in that it employs feed-forward control based on a measured power imbalance rather that relying on a frequency measurement. As a result, time-domain simulations of the full Western Electricity Coordinating Council (WECC) system are conducted to demonstrate the effectiveness of the proposed method,more » showing improved performance.« less

  6. Communication enabled – fast acting imbalance reserve (CE-FAIR)

    DOE PAGES

    Wilches-Bernal, Felipe; Concepcion, Ricky; Neely, Jason C.; ...

    2017-06-08

    This letter presents a new frequency control strategy that takes advantage of communications and fast responding resources like PV generation, energy storage, wind generation, and demand response, termed collectively as converter interfaced generators (CIGs). The proposed approach uses an active monitoring of power imbalances to rapidly redispatch CIGs. This approach differs from previously proposed frequency control schemes in that it employs feed-forward control based on a measured power imbalance rather that relying on a frequency measurement. As a result, time-domain simulations of the full Western Electricity Coordinating Council (WECC) system are conducted to demonstrate the effectiveness of the proposed method,more » showing improved performance.« less

  7. Taking 'control': Federal energy regulatory Commission policy on acquisitions of electric utility securities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bloom, David I.; O'Brien, Angela D.

    2009-05-15

    Section 203 of the Federal Power Act remains subject to considerable uncertainty. Therefore, it is important to keep several rules in mind. Each potential acquisition must be separately analyzed under Section 203(a)(1) and 203(a)(2) of the Act. A proposed acquisition that is exempt or preapproved under one provision may still require prior FERC approval under the other one. (author)

  8. MOSFET Electric-Charge Sensor

    NASA Technical Reports Server (NTRS)

    Robinson, Paul A., Jr.

    1988-01-01

    Charged-particle probe compact and consumes little power. Proposed modification enables metal oxide/semiconductor field-effect transistor (MOSFET) to act as detector of static electric charges or energetic charged particles. Thickened gate insulation acts as control structure. During measurements metal gate allowed to "float" to potential of charge accumulated in insulation. Stack of modified MOSFET'S constitutes detector of energetic charged particles. Each gate "floats" to potential induced by charged-particle beam penetrating its layer.

  9. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared anmore » environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.« less

  10. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield weremore » determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.« less

  11. 75 FR 70730 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ...(f) of the Federal Power Act, proposing to study the feasibility of the Salem Tidal Energy Project... Atlantic Port Terminal to the south. The project proposes between 10 and 30 NC Sea Dragon or Red Hawk tidal... minimum of 3,504,000 kW hours per year with the installation of 10 units. Applicant Contact: Mr. Roger...

  12. Properties of four real world collaboration--competition networks

    NASA Astrophysics Data System (ADS)

    Fu, Chun-Hua; Xu, Xiu-Lian; He, Da-Ren

    2009-03-01

    Our research group has empirically investigated 9 real world collaboration networks and 25 real world cooperation-competition networks. Among the 34 real world systems, all the 9 real world collaboration networks and 6 real world cooperation-competition networks show the unimodal act-size distribution and the shifted power law distribution of degree and act-degree. We have proposed a collaboration network evolution model for an explanation of the rules [1]. The other 14 real world cooperation-competition networks show that the act-size distributions are not unimodal; instead, they take qualitatively the same shifted power law forms as the degree and act-degree distributions. The properties of four systems (the main land movie film network, Beijing restaurant network, 2004 Olympic network, and Tao-Bao notebook computer sale network) are reported in detail as examples. Via a numerical simulation, we show that the new rule can still be explained by the above-mentioned model. [1] H. Chang, B. B. Su, et al. Phsica A, 2007, 383: 687-702.

  13. Supervisor-employee power distance incompatibility, gender similarity, and relationship conflict: A test of interpersonal interaction theory.

    PubMed

    Graham, Katrina A; Dust, Scott B; Ziegert, Jonathan C

    2018-03-01

    According to interpersonal interaction theory, relational harmony surfaces when two individuals have compatible interaction styles. Building from this theory, we propose that supervisor-employee power distance orientation incompatibility will be related to employees' experience of higher levels of relationship conflict with their supervisors. Additionally, we propose an asymmetrical incongruence effect such that relationship conflict will be highest when supervisors are high in power distance and employees are low in power distance. Furthermore, we address calls in interpersonal interaction research for more direct attention to the social context of the dyadic interaction and explore the moderating effects of supervisor-employee gender (dis)similarity on the relationship between this incompatibility and conflict. We propose that supervisor-employee gender dissimilarity (e.g., male-female or female-male pairs) acts as a conditional moderator, neutralizing the power distance incongruence effect and the asymmetrical incongruence effect. Using 259 supervisor-employee dyads in the physical therapy industry, the hypotheses were generally supported. Theoretical and practical implications regarding the unique benefits of power distance compatibility and gender diversity in supervisor-employee dyads are discussed. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  14. 18 CFR 153.16 - Contents of application.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... 153.16 Section 153.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR AUTHORIZATION TO CONSTRUCT, OPERATE... proposing to amend the article(s) of an existing Presidential Permit (other than facilities aspects) must...

  15. 18 CFR 153.16 - Contents of application.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... 153.16 Section 153.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR AUTHORIZATION TO CONSTRUCT, OPERATE... proposing to amend the article(s) of an existing Presidential Permit (other than facilities aspects) must...

  16. 78 FR 77667 - Proposed Agency Information Collection Extension With Changes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    ... with changes, under the provisions of the Paperwork Reduction Act of 1995, for the Electricity and.../electricity/ . SUPPLEMENTARY INFORMATION: This information collection request contains: (1) OMB No.: 1905-0129; (2) Information Collection Request Title: Electricity and Renewables Power Surveys; (3) Type of...

  17. Linear triangular optimization technique and pricing scheme in residential energy management systems

    NASA Astrophysics Data System (ADS)

    Anees, Amir; Hussain, Iqtadar; AlKhaldi, Ali Hussain; Aslam, Muhammad

    2018-06-01

    This paper presents a new linear optimization algorithm for power scheduling of electric appliances. The proposed system is applied in a smart home community, in which community controller acts as a virtual distribution company for the end consumers. We also present a pricing scheme between community controller and its residential users based on real-time pricing and likely block rates. The results of the proposed optimization algorithm demonstrate that by applying the anticipated technique, not only end users can minimise the consumption cost, but it can also reduce the power peak to an average ratio which will be beneficial for the utilities as well.

  18. American Recovery and Reinvestment Act - Department of the Navy Near Term Energy-Efficient Technologies Projects

    DTIC Science & Technology

    2011-06-23

    contract; information required to be in the offeror’s proposal; and factors and significant subfactors, and their relative importance, which will...development and testing, alternative fuels, alternative fuel sources, and small-scale cogeneration . 1. On-Board Vehicle Power The purpose of the On...savings of 20 percent, greater heating and cooling capacity , and provision of full 30 kilowatts of electrical power output in all environments

  19. Proposed Columbia Wind Farm No. 1 : Draft Environmental Impact Statement, Joint NEPA/SEPA.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Klickitat County

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided bymore » RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.« less

  20. 78 FR 34431 - Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ...EPA is proposing a regulation that would strengthen the controls on discharges from certain steam electric power plants by revising technology-based effluent limitations guidelines and standards for the steam electric power generating point source category. Steam electric power plants alone contribute 50-60 percent of all toxic pollutants discharged to surface waters by all industrial categories currently regulated in the United States under the Clean Water Act. Furthermore, power plant discharges to surface waters are expected to increase as pollutants are increasingly captured by air pollution controls and transferred to wastewater discharges. This proposal, if implemented, would reduce the amount of toxic metals and other pollutants discharged to surface waters from power plants. EPA is considering several regulatory options in this rulemaking and has identified four preferred alternatives for regulation of discharges from existing sources. These four preferred alternatives differ with respect to the scope of requirements that would be applicable to existing discharges of pollutants found in two wastestreams generated at power plants. EPA estimates that the preferred options for this proposed rule would annually reduce pollutant discharges by 0.47 billion to 2.62 billion pounds, reduce water use by 50 billion to 103 billion gallons, cost $185 million to $954 million, and would be economically achievable.

  1. 78 FR 26033 - Agency Forms Undergoing Paperwork Reduction Act Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... precision requirements or power calculations that justify the proposed sample size, the expected response... Collection of Qualitative Feedback on Agency Service Delivery--NEW--Epidemiology and Analysis Program Office... Clearance for the Collection of Qualitative Feedback on Agency Service Delivery'' to OMB for approval under...

  2. 76 FR 56425 - Union Electric Company, dba Ameren Missouri; Notice of Application for Amendment of License and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... location coordinates are 38.199986 North, -92.645562 West. g. Filed Pursuant to: Federal Power Act, 16 U.S... is a proposed T- shaped courtesy dock with 5 mooring spots, dock number 3 would serve as a courtesy...

  3. 18 CFR 50.6 - Applications: general content.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... interstate commerce and protects or benefits consumers; (3) Is consistent with sound national energy policy... Energy under section 216 of the Federal Power Act. (e) Evidence that: (1) A State in which the... the facilities or consider the interstate benefits expected to be achieved by the proposed...

  4. Postsecondary Education Reform in Kentucky. Issue Brief.

    ERIC Educational Resources Information Center

    Rabuzzi, Daniel A.; Carson, Ron

    As governors and states seek to improve the responsiveness of postsecondary education, Kentucky's experience provides a powerful example of a systemic reform strategy. In 1997, Kentucky's governor proposed, and the General Assembly approved, the Postsecondary Education Improvement Act (House Bill 1), which reshaped the state system of public…

  5. 76 FR 45741 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Diesel-Powered Motor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-01

    ...EPA proposes to approve the State Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania for the purpose of incorporating the Commonwealth's Diesel-Powered Motor Vehicle Idling Act (Act 124 of 2008, or simply Act 124) into the Pennsylvania SIP. Act 124, passed by the Pennsylvania General Assembly and signed into state law by Governor Rendell in October 2008 (and effective at the state level in February 2009), reduces the allowable time that heavy-duty, commercial highway diesel vehicles of over 10,000 pounds gross vehicle weight can idle their main propulsion engines. The law restricts idling of these commercial diesel vehicles (mostly heavy trucks and buses) to a period of 5 minutes per continuous 60 minute period (with certain allowable exemptions and exclusions). Act 124 applies statewide in the Commonwealth, and is estimated by Pennsylvania to significantly reduce emissions of nitrogen oxides (NOX), volatile organic compounds (VOCs), and fine particulate matter (PM). While idle time emissions limits are not mandatory under the Clean Air Act (CAA), incorporation of Act 124 into the SIP does strengthen the SIP, makes the state law federally enforceable by EPA, and allows the Commonwealth to take credit for emissions benefits from the rule as part of future Pennsylvania SIP revisions to demonstrate compliance with CAA National Ambient Air Quality Standards (NAAQS). This action is being taken under the CAA. In the Final Rules section of this Federal Register, EPA is approving the Commonwealth's SIP submittal as a direct final rule without prior proposal because EPA views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.

  6. Improving electrical power systems reliability through locally controlled distributed curtailable load

    NASA Astrophysics Data System (ADS)

    Dehbozorgi, Mohammad Reza

    2000-10-01

    Improvements in power system reliability have always been of interest to both power companies and customers. Since there are no sizable electrical energy storage elements in electrical power systems, the generated power should match the load demand at any given time. Failure to meet this balance may cause severe system problems, including loss of generation and system blackouts. This thesis proposes a methodology which can respond to either loss of generation or loss of load. It is based on switching of electric water heaters using power system frequency as the controlling signal. The proposed methodology encounters, and the thesis has addressed, the following associated problems. The controller must be interfaced with the existing thermostat control. When necessary to switch on loads, the water in the tank should not be overheated. Rapid switching of blocks of load, or chattering, has been considered. The contributions of the thesis are: (A) A system has been proposed which makes a significant portion of the distributed loads connected to a power system to behave in a predetermined manner to improve the power system response during disturbances. (B) The action of the proposed system is transparent to the customers. (C) The thesis proposes a simple analysis for determining the amount of such loads which might be switched and relates this amount to the size of the disturbances which can occur in the utility. (D) The proposed system acts without any formal communication links, solely using the embedded information present system-wide. (E) The methodology of the thesis proposes switching of water heater loads based on a simple, localized frequency set-point controller. The thesis has identified the consequent problem of rapid switching of distributed loads, which is referred to as chattering. (F) Two approaches have been proposed to reduce chattering to tolerable levels. (G) A frequency controller has been designed and built according to the specifications required to switch electric water heater loads in response to power system disturbances. (H) A cost analysis for building and installing the distributed frequency controller has been carried out. (I) The proposed equipment and methodology has been implemented and tested successfully. (Abstract shortened by UMI.)

  7. 75 FR 61479 - Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13801-000] Kendall Head Tidal Energy Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Federal Power Act, proposing to study the feasibility of the Kendall Head Tidal Energy Project, located in...

  8. 78 FR 25954 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Act (NEPA) by the Bonneville Power Administration (BPA) for its funding of the Snake River sockeye salmon hatchery program, including modifications to the Springfield Hatchery. Because the BPA action is... submitted HGMP and the Springfield Sockeye Hatchery Master Plan, NMFS proposes to adopt the BPA...

  9. 75 FR 66750 - Albany-Eugene Transmission Line Rebuild Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of... Environmental Policy Act (NEPA), BPA intends to prepare an EIS on its proposed rebuild of a 32- mile section of... deteriorated condition of this 70-year old line compromises BPA's ability to maintain reliable electric service...

  10. 18 CFR 157.33 - Requirement for open season.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Requirement for open... GAS ACT Open Seasons for Alaska Natural Gas Transportation Projects § 157.33 Requirement for open... applicant has conducted an open season for capacity on its proposed project, in accordance with the...

  11. 18 CFR 157.33 - Requirement for open season.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Requirement for open... GAS ACT Open Seasons for Alaska Natural Gas Transportation Projects § 157.33 Requirement for open... applicant has conducted an open season for capacity on its proposed project, in accordance with the...

  12. 18 CFR 157.33 - Requirement for open season.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Requirement for open... GAS ACT Open Seasons for Alaska Natural Gas Transportation Projects § 157.33 Requirement for open... applicant has conducted an open season for capacity on its proposed project, in accordance with the...

  13. 18 CFR 157.33 - Requirement for open season.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Requirement for open... GAS ACT Open Seasons for Alaska Natural Gas Transportation Projects § 157.33 Requirement for open... applicant has conducted an open season for capacity on its proposed project, in accordance with the...

  14. 18 CFR 157.33 - Requirement for open season.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Requirement for open... GAS ACT Open Seasons for Alaska Natural Gas Transportation Projects § 157.33 Requirement for open... applicant has conducted an open season for capacity on its proposed project, in accordance with the...

  15. A novel control strategy for enhancing the LVRT and voltage support capabilities of DFIG

    NASA Astrophysics Data System (ADS)

    Shen, Yangwu; Zhang, Bin; Liang, Liqing; Cui, Ting

    2018-02-01

    A novel integrated control strategy is proposed in this paper to enhance the low voltage ride through capacity for the double-fed induction generator by equipping an energy storage system. The energy storage system is installed into the DC-link capacitor of the DFIG and used to control the DC-link voltage during normal or transient operations. The energy storage device will absorb or compensate the power difference between the captured wind power and the power injected to the grid during the normal and transient period, and the grid side converter can be free from maintaining the voltage stability of the DC-link capacitor. Thus, the grid-side converter is changed to reactive power support while the rotor-side converter is used to control the maximum power production during normal operation. The grid-side converter and rotor-side converter will act as reactive power sources to further enhance the voltage support capability of double-fed induction generator during the transient period. Numerical Simulation are performed to validate the effectiveness of the proposed control designs.

  16. 78 FR 62324 - Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-16

    ... Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 25, 2013, Mid-Atlantic Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  17. 76 FR 20658 - Qualified Hydro 25, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... 25, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 30, 2010, Qualified Hydro 25, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  18. 78 FR 60271 - Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 16, 2013, Mid-Atlantic Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  19. 75 FR 8321 - Coastal Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications February 18, 2010. On November 5, 2009, Coastal Hydropower LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing...

  20. 78 FR 69081 - JD Products, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ...; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 1, 2013, JD Products, LLC (JD Products) filed an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing...

  1. 78 FR 8512 - West Street Hydro, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Hydro, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 10, 2012, West Street Hydro, Inc., filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study...

  2. 78 FR 69080 - Houtama Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... Hydropower LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 14, 2013, Houtama Hydropower LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  3. 78 FR 42520 - Control Technology, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... Technology, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 18, 2012, Control Technology, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study...

  4. 78 FR 69081 - Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 9, 2013, Mid-Atlantic Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  5. 78 FR 28838 - Hamilton Street Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 26, 2013, Hamilton Street Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  6. 18 CFR 35.3 - Notice requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT FILING OF RATE SCHEDULES AND TARIFFS Application... thereof shall be tendered for filing with the Commission and posted not less than sixty days nor more than... effective under an initial rate schedule or tariff or the date on which the filing party proposes to make...

  7. 18 CFR 385.1505 - Determination of proposed penalty amount (Rule 1505).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROCEDURE Procedures for the Assessment of Civil Penalties Under Section 31 of the Federal Power Act § 385... consider the following factors: (1) Whether the person had actual knowledge of the violation; (2) Whether the person had constructive knowledge of the violation deemed to be possessed by a reasonable...

  8. 78 FR 12308 - Washoe Project-Rate Order No. WAPA-160

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ..., Acting Administrator. [FR Doc. 2013-04115 Filed 2-21-13; 8:45 am] BILLING CODE 6450-01-P ... Powerplant (Stampede) non-firm power formula rate, Schedule SNF-7, through September 30, 2017. The existing... through December 31, 2024. Western proposes to extend the current rate schedule through September 30, 2017...

  9. The power transfer from the neuromuscular machinery to its load as a vegetative and somatic behaviour.

    PubMed

    Federici, A; Nocera, L

    1990-01-01

    Models have been proposed in literature describing the contraction of visceral and somatic muscles as an interaction between the time-varying elastances of them and the loads they are working against. The aim of this paper is: 1) to make clear similarities between the models of visceral and somatic muscular contraction; 2) to stress the concept that the power transfer from a time-varying elastance to its load is a behaviour, i.e. an interaction between the entire neuromuscular machinery and the surrounding environment; 3) to propose a theory describing the various physiological and pathological behaviours of both visceral and somatic muscles as different ways of coupling between the time-varying muscular elastances and their loads. In this theory it is assumed that the entire neuromuscular machinery acts as a whole to set the most appropriate power transfer to achieve behavioural goals.

  10. RESTOP: Retaining External Peripheral State in Intermittently-Powered Sensor Systems.

    PubMed

    Rodriguez Arreola, Alberto; Balsamo, Domenico; Merrett, Geoff V; Weddell, Alex S

    2018-01-10

    Energy harvesting sensor systems typically incorporate energy buffers (e.g., rechargeable batteries and supercapacitors) to accommodate fluctuations in supply. However, the presence of these elements limits the miniaturization of devices. In recent years, researchers have proposed a new paradigm, transient computing, where systems operate directly from the energy harvesting source and allow computation to span across power cycles, without adding energy buffers. Various transient computing approaches have addressed the challenge of power intermittency by retaining the processor's state using non-volatile memory. However, no generic approach has yet been proposed to retain the state of peripherals external to the processing element. This paper proposes RESTOP, flexible middleware which retains the state of multiple external peripherals that are connected to a computing element (i.e., a microcontroller) through protocols such as SPI or I 2 C. RESTOP acts as an interface between the main application and the peripheral, which keeps a record, at run-time, of the transmitted data in order to restore peripheral configuration after a power interruption. RESTOP is practically implemented and validated using three digitally interfaced peripherals, successfully restoring their configuration after power interruptions, imposing a maximum time overhead of 15% when configuring a peripheral. However, this represents an overhead of only 0.82% during complete execution of our typical sensing application, which is substantially lower than existing approaches.

  11. Klickitat Cogeneration Project : Final Environmental Assessment.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2)more » impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).« less

  12. 75 FR 42728 - Copper Valley Electric Association, Inc.; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Federal Power Act, proposing to study the feasibility of the Silver Lake Hydroelectric Project, located on Silver Lake and Duck River, in the Valdez-Cordova Census Area, Alaska. The sole purpose of a preliminary...-high roller-compacted concrete dam constructed at the outfall of Silver Lake to Duck River; (2) Silver...

  13. 75 FR 28597 - Public Utility District No. 1 of Snohomish County; Notice of Preliminary Permit Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... (Snohomish PUD) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Deception Pass Tidal Energy Project (project). The... consist of the following: (1) Four approximately 66-foot-diameter, 1.6-megawatt horizontal axis tidal...

  14. 75 FR 66081 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... the Federal Power Act, proposing to study the feasibility of the Killisnoo Tidal Energy Project... generation of 1,000 megawatt-hours. Applicant Contact: Roger Bason, President, Natural Currents Energy... Support. Kimberly D. Bose, Secretary. [FR Doc. 2010-27127 Filed 10-26-10; 8:45 am] BILLING CODE 6717-01-P ...

  15. 76 FR 76155 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... annual minimum generation of 3,504,000 kilowatt-hours with the installation of 10 units. Applicant... Services, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Maurice River Tidal Energy Project, which would be located on the Maurice River...

  16. 76 FR 70720 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... annual minimum generation of 3,504,000 kilowatt-hours with the installation of 10 units. Applicant... Services, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Avalon Tidal Energy Project, which would be located on the Ingram Thoroughfare...

  17. 75 FR 29575 - Endangered and Threatened Wildlife and Plants; Indiana Bat; Notice of Intent To Prepare a Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... maintenance facility buildings, and temporary staging areas and concrete batch plants. The wind turbine hub... alternatives relating to the proposed issuance of an Endangered Species Act Permit to EverPower Wind Holdings, Inc., its subsidiary Buckeye Wind LLC, and its affiliates (applicant) for incidental take of the...

  18. 78 FR 32644 - Las Vegas Wash Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-31

    ... Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On November 16, 2012, Las Vegas Wash Hydro LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  19. 77 FR 20411 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Southline...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management DEPARTMENT OF ENERGY Western Area Power...-0474) and Possible Land Use Plan Amendments AGENCY: Bureau of Land Management, U.S. Department of the... Land Policy and Management Act of 1976 (FLPMA), as amended, the Bureau of Land Management (BLM) Las...

  20. 76 FR 67181 - Windsor Machinery Co., Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Machinery Co., Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 15, 2011, Windsor Machinery Co., Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to...

  1. 77 FR 34378 - PJM Interconnection, L.L.C.; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... Interconnection, L.L.C.; Notice of Complaint Take notice that on June 1, 2012, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824(e), PJM Interconnection, L.L.C. (PJM) filed proposed revisions to the Amended and Restated Operating Agreement of PJM Interconnection L.L.C. (Operating Agreement) to...

  2. 75 FR 21289 - Oregon Wave Energy Partners I, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12749-002] Oregon Wave...) of the Federal Power Act, proposing to study the feasibility of the Coos Bay OPT Wave Park Project... Comments, Motions To Intervene, and Competing Applications April 16, 2010. On March 2, 2010, Oregon Wave...

  3. 76 FR 30341 - Town of Edgartown; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ...), filed an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Muskeget Channel Tidal Energy Project to be..., and one experimental turbine unit that would be used to test various open- bladed and helical tidal...

  4. Technical Feasible Study for Future Solar Thermal Steam Power Station in Malaysia

    NASA Astrophysics Data System (ADS)

    Bohari, Z. H.; Atira, N. N.; Jali, M. H.; Sulaima, M. F.; Izzuddin, T. A.; Baharom, M. F.

    2017-10-01

    This paper proposed renewable energy which is potential to be used in Malaysia in generating electricity to innovate and improve current operating systems. Thermal and water act as the resources to replace limited fossil fuels such as coal which is still widely used in energy production nowadays. Thermal is also known as the heat energy while the water absorbs energy from the thermal to produce steam energy. By combining both of the sources, it is known as thermal steam renewable energy. The targeted area to build this power station has constant high temperature and low humidity which can maximize the efficiency of generating power.

  5. Design-Parameters Setup for Power-Split Dual-Regime IVT

    NASA Astrophysics Data System (ADS)

    Preda, Ion; Ciolan, Gheorghe; Covaciu, Dinu

    2017-10-01

    To analyze the working possibilities of power-split infinitely variable transmissions (IVTs) it is necessary to follow a systematic approach. The method proposed in this paper consists of generating a block diagram of the transmission and then, based on this diagram, to derive the kinematics and dynamics equations of the transmission. For an actual numerical case, the derived equations are used to find characteristic values of the transmission components (gear and chain drives, planetary units) necessary to calculate the speed ratios, the speeds, torques and powers acting on the shafts and coupling (control) elements, and even to estimate the overall efficiency of the transmission.

  6. How Power Affects People: Activating, Wanting, and Goal Seeking.

    PubMed

    Guinote, Ana

    2017-01-03

    Sociocognitive research has demonstrated that power affects how people feel, think, and act. In this article, I review literature from social psychology, neuroscience, management, and animal research and propose an integrated framework of power as an intensifier of goal-related approach motivation. A growing literature shows that power energizes thought, speech, and action and orients individuals toward salient goals linked to power roles, predispositions, tasks, and opportunities. Power magnifies self-expression linked to active parts of the self (the active self), enhancing confidence, self-regulation, and prioritization of efforts toward advancing focal goals. The effects of power on cognitive processes, goal preferences, performance, and corruption are discussed, and its potentially detrimental effects on social attention, perspective taking, and objectification of subordinates are examined. Several inconsistencies in the literature are explained by viewing power holders as more flexible and dynamic than is usually assumed.

  7. Novel Modulation Method for Multidirectional Matrix Converter

    PubMed Central

    Misron, Norhisam; Aris, Ishak Bin; Yamada, Hiroaki

    2014-01-01

    This study presents a new modulation method for multidirectional matrix converter (MDMC), based on the direct duty ratio pulse width modulation (DDPWM). In this study, a new structure of MDMC has been proposed to control the power flow direction through the stand-alone battery based system and hybrid vehicle. The modulation method acts based on the average voltage over one switching period concept. Therefore, in order to determine the duty ratio for each switch, the instantaneous input voltages are captured and compared with triangular waveform continuously. By selecting the proper switching pattern and changing the slope of the carriers, the sinusoidal input current can be synthesized with high power factor and desired output voltage. The proposed system increases the discharging time of the battery by injecting the power to the system from the generator and battery at the same time. Thus, it makes the battery life longer and saves more energy. This paper also derived necessary equation for proposed modulation method as well as detail of analysis and modulation algorithm. The theoretical and modulation concepts presented have been verified in MATLAB simulation. PMID:25298969

  8. A Multi-Robot Sense-Act Approach to Lead to a Proper Acting in Environmental Incidents

    PubMed Central

    Conesa-Muñoz, Jesús; Valente, João; del Cerro, Jaime; Barrientos, Antonio; Ribeiro, Angela

    2016-01-01

    Many environmental incidents affect large areas, often in rough terrain constrained by natural obstacles, which makes intervention difficult. New technologies, such as unmanned aerial vehicles, may help address this issue due to their suitability to reach and easily cover large areas. Thus, unmanned aerial vehicles may be used to inspect the terrain and make a first assessment of the affected areas; however, nowadays they do not have the capability to act. On the other hand, ground vehicles rely on enough power to perform the intervention but exhibit more mobility constraints. This paper proposes a multi-robot sense-act system, composed of aerial and ground vehicles. This combination allows performing autonomous tasks in large outdoor areas by integrating both types of platforms in a fully automated manner. Aerial units are used to easily obtain relevant data from the environment and ground units use this information to carry out interventions more efficiently. This paper describes the platforms and sensors required by this multi-robot sense-act system as well as proposes a software system to automatically handle the workflow for any generic environmental task. The proposed system has proved to be suitable to reduce the amount of herbicide applied in agricultural treatments. Although herbicides are very polluting, they are massively deployed on complete agricultural fields to remove weeds. Nevertheless, the amount of herbicide required for treatment is radically reduced when it is accurately applied on patches by the proposed multi-robot system. Thus, the aerial units were employed to scout the crop and build an accurate weed distribution map which was subsequently used to plan the task of the ground units. The whole workflow was executed in a fully autonomous way, without human intervention except when required by Spanish law due to safety reasons. PMID:27517934

  9. Conditional quantum entropy power inequality for d-level quantum systems

    NASA Astrophysics Data System (ADS)

    Jeong, Kabgyun; Lee, Soojoon; Jeong, Hyunseok

    2018-04-01

    We propose an extension of the quantum entropy power inequality for finite dimensional quantum systems, and prove a conditional quantum entropy power inequality by using the majorization relation as well as the concavity of entropic functions also given by Audenaert et al (2016 J. Math. Phys. 57 052202). Here, we make particular use of the fact that a specific local measurement after a partial swap operation (or partial swap quantum channel) acting only on finite dimensional bipartite subsystems does not affect the majorization relation for the conditional output states when a separable ancillary subsystem is involved. We expect our conditional quantum entropy power inequality to be useful, and applicable in bounding and analyzing several capacity problems for quantum channels.

  10. Modelling and Simulation of Single-Phase Series Active Compensator for Power Quality Improvement

    NASA Astrophysics Data System (ADS)

    Verma, Arun Kumar; Mathuria, Kirti; Singh, Bhim; Bhuvaneshwari, G.

    2017-10-01

    A single-phase active series compensator is proposed in this work to reduce harmonic currents at the ac mains and to regulate the dc link voltage of a diode bridge rectifier (DBR) that acts as the front end converter for a voltage source inverter feeding an ac motor. This ac motor drive is used in any of the domestic, commercial or industrial appliances. Under fluctuating ac mains voltages, the dc link voltage of the DBR depicts wide variations and hence the ac motor is used at reduced rating as compared to its name-plate rating. The active series compensator proposed here provides dual functions of improving the power quality at the ac mains and regulating the dc link voltage thus averting the need for derating of the ac motor.

  11. Optical search for extraterrestrial intelligence with Air Cerenkov telescopes.

    PubMed

    Eichler, D; Beskin, G

    2001-01-01

    We propose using large Air Cerenkov telescopes (ACTs) to search for optical, pulsed signals from extraterrestrial intelligence. Such dishes collect tens of photons from a nanosecond-scale pulse of isotropic equivalent power of tens of solar luminosities at a distance of 100 pc. The field of view for giant ACTs can be on the order of 10 square degrees, and they will be able to monitor 10-100 stars simultaneously for nanosecond pulses of about 6th magnitude or brighter. Using the Earth's diameter as a baseline, orbital motion of the planet could be detected by timing the pulse arrivals.

  12. Toward an SEC-FERC memorandum of understanding. [SEC-FERC (Securities and Exchange Commission-Federal Energy Regulatory Commission)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moeller, J.W.

    1994-01-01

    The Securities and Exchange Commission (SEC) is under fire. For the past year, Congress has criticized its administration of the Public Utility Holding Company Act of 1935 (PUHCA). The criticism might persuade Congress to transfer the administration of PUHCA from the SEC to the Federal Energy Regulatory Commission (FERC). Section I of this article briefly describes the events of the past year and the implications of transfer of PUHCA from the SEC to the FERC. Section II of this article discusses the background relationship of PUHCA, under which the SEC regulates the securities transactions of public utilities, to the Federalmore » Power Act, under which the FERC regulates the rates of public utilities. Section III discusses the case involving the Ohio Power Company, which resulted in a November 1990 decision of the Supreme Court, that recently has highlighted the conflict in jurisdiction between the SEC and the FERC relative to the regulation of public utilities. Section IV discusses the immediate responses to that conflict--a proposed amendment to a FERC regulation and S. 544--and the reasons that neither response is an ideal solution. Section V proposes an alternative to those immediate responses--the Memorandum of Understanding. An Appendix is provided which proposes a draft Memorandum of Understanding between the SEC and the FERC.« less

  13. Stabilized single-longitudinal-mode erbium fibre laser employing silicon-micro-ring resonator and saturable absorber

    NASA Astrophysics Data System (ADS)

    Hsu, Yung; Yeh, Chien-Hung; Chow, Chi-Wai; Chang, Yuan-Chia; Cheng, Hao-Yun

    2018-07-01

    In the paper, a wavelength-tunable erbium-doped fiber (EDF) ring laser with stable single-longitudinal-mode (SLM) oscillation is proposed and investigated. Here, a silicon-micro-ring-resonator can be applied in a laser cavity for tuning wavelength in the C-band range. To complete the SLM oscillation, an unpumped EDF-based saturable absorber is used to act as ultra-narrowband filter for suppressing other oscillation modes. Additionally, the output stabilities of power and wavelength in the proposed EDF ring laser are also executed and discussed.

  14. 76 FR 37806 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... 10 to 30 NC Sea Dragon or Red Hawk tidal turbines at a rated capacity of 100 kilowatts, (2) an... Federal Power Act, proposing to study the feasibility of the Cohansey River Energy Project, which would be.... The project is estimated to have an annual minimum generation of 3,504,000 kilowatt-hours with the...

  15. 77 FR 61598 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... Services, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study... tidal turbines at a rated capacity of 100 kilowatts, (2) an estimated 2.5 kilometers in length of... a minimum of 17,520 megawatt hours per year with the installation of 50 units. Applicant Contact: Mr...

  16. 76 FR 71004 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... estimated to have an annual minimum generation of 3,504,000 kilowatt-hours with the installation of 10 units... Services, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Margate Tidal Energy Project, which would be located on the Beach Thoroughfare...

  17. 76 FR 67726 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... estimated to have an annual minimum generation of 3,504,000 kilowatt-hours with the installation of 10 units... Services, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Dorchester--Maurice Tidal Energy Project, which would be located on the Maurice...

  18. 76 FR 76154 - Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... annual minimum generation of 3,504,000 kilowatt-hours with the installation of 10 units. Applicant... Services, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Cape May Tidal Energy Project, which would be located on the Cape May Canal in...

  19. 33 CFR 221.1 - Investigation and supervision of hydropower projects under the Federal Power Act (ER 1140-2-4).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... granting authority for either construction, in the case of a proposed project, or for continued operation... full public interest review pursuant to 33 CFR part 320 and the application of the Environmental...) Consideration of the project in relation to a comprehensive plan for developing the basin water resources from...

  20. 75 FR 63450 - Wilkesboro Hydroelectric Company; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    .... Applicant: Wilkesboro Hydroelectric Company. e. Name of Project: W. Kerr Scott Hydropower Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineers' (Corps) W... Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Mr. Kevin Edwards, P.O. Box...

  1. 75 FR 47588 - Trans Bay Cable, LLC; Notice of Institution of Section 206 Investigation and Refund Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... Cable, LLC; Notice of Institution of Section 206 Investigation and Refund Effective Date July 30, 2010...-116-000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e, concerning the justness and reasonableness of rates proposed by Trans Bay Cable, LLC (Trans Bay) in [[Page 47589

  2. 75 FR 66082 - ORPC Alaska 2, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the East Foreland Tidal Energy Project (East Foreland project) to be located in Cook Inlet in the vicinity of... from the module site to a shore station on the west coast of the Kenai Peninsula; (3) an approximately...

  3. RESTOP: Retaining External Peripheral State in Intermittently-Powered Sensor Systems

    PubMed Central

    Rodriguez Arreola, Alberto; Balsamo, Domenico

    2018-01-01

    Energy harvesting sensor systems typically incorporate energy buffers (e.g., rechargeable batteries and supercapacitors) to accommodate fluctuations in supply. However, the presence of these elements limits the miniaturization of devices. In recent years, researchers have proposed a new paradigm, transient computing, where systems operate directly from the energy harvesting source and allow computation to span across power cycles, without adding energy buffers. Various transient computing approaches have addressed the challenge of power intermittency by retaining the processor’s state using non-volatile memory. However, no generic approach has yet been proposed to retain the state of peripherals external to the processing element. This paper proposes RESTOP, flexible middleware which retains the state of multiple external peripherals that are connected to a computing element (i.e., a microcontroller) through protocols such as SPI or I2C. RESTOP acts as an interface between the main application and the peripheral, which keeps a record, at run-time, of the transmitted data in order to restore peripheral configuration after a power interruption. RESTOP is practically implemented and validated using three digitally interfaced peripherals, successfully restoring their configuration after power interruptions, imposing a maximum time overhead of 15% when configuring a peripheral. However, this represents an overhead of only 0.82% during complete execution of our typical sensing application, which is substantially lower than existing approaches. PMID:29320441

  4. Power system market implementation in a deregulated environment

    NASA Astrophysics Data System (ADS)

    Silva, Carlos

    2000-10-01

    The opening of the power system markets (also known as deregulation) gives rise to issues never seen before by this industry. One of the most important is the control of information about the cost of generation. Information that used to be common knowledge is now kept private by the new agents of the system (generator companies, distribution companies, etc.). Data such as the generator cost functions are now known only by the owning companies. The result is a new system consisting of a group of independent firms seeking the maximization of their own profit. There have been many proposals to organize the new market in an economically efficient manner. Nevertheless, the uniqueness of the electric power system has prevented the development of such a market. This thesis evaluates the most common proposals using simulations in an auction setting. In addition a new methodology is proposed based on mechanism design, a common technique in economics, that solves some of the practical problems of power system markets (such as the management of limited transmission capacity). In this methodology, when each company acts in its best interest, the outcome is efficient in spite of the information problem cited above. This new methodology, along with the existing methodologies, are tested using simulation and analyzed to create a clear comparison of benefits and disadvantages.

  5. 76 FR 58345 - Energy Conservation Program: Test Procedures for Residential Dishwashers, Dehumidifiers, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ...Where appropriate, the U.S. Department of Energy (DOE) has proposed to amend its test procedures for residential dishwashers, dehumidifiers, and conventional cooking products (which includes cooktops, ovens, and ranges) to include provisions for measuring standby mode and off mode energy consumption, as required by the Energy Independence and Security Act of 2007 (EISA 2007). These test procedure amendments would incorporate by reference certain provisions of the International Electrotechnical Commission (IEC) Standard 62301, ``Household electrical appliances--Measurement of standby power.'' Since publication of DOE's initial proposal in December 2010, the IEC has replaced the First Edition of this standard with the current Second Edition. This supplemental notice of proposed rulemaking proposes to incorporate the latest edition of IEC Standard 62301.

  6. 18 CFR 367.3960 - Account 396, Power operated equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL...

  7. The Motor and the Brake of the Trailing Leg in Human Walking: Leg Force Control Through Ankle Modulation and Knee Covariance

    PubMed Central

    Toney, Megan E.; Chang, Young-Hui

    2016-01-01

    Human walking is a complex task, and we lack a complete understanding of how the neuromuscular system organizes its numerous muscles and joints to achieve consistent and efficient walking mechanics. Focused control of select influential task-level variables may simplify the higher-level control of steady state walking and reduce demand on the neuromuscular system. As trailing leg power generation and force application can affect the mechanical efficiency of step-to-step transitions, we investigated how joint torques are organized to control leg force and leg power during human walking. We tested whether timing of trailing leg force control corresponded with timing of peak leg power generation. We also applied a modified uncontrolled manifold analysis to test whether individual or coordinated joint torque strategies most contributed to leg force control. We found that leg force magnitude was adjusted from step-to-step to maintain consistent leg power generation. Leg force modulation was primarily determined by adjustments in the timing of peak ankle plantar-flexion torque, while knee torque was simultaneously covaried to dampen the effect of ankle torque on leg force. We propose a coordinated joint torque control strategy in which the trailing leg ankle acts as a motor to drive leg power production while trailing leg knee torque acts as a brake to refine leg power production. PMID:27334888

  8. 75 FR 66378 - Formations of, Acquisitions by, and Mergers of Bank Holding Companies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... applicable statutes and regulations to become a bank holding company and/or to acquire the assets or the ownership of, control of, or the power to vote shares of a bank or bank holding company and all of the banks... standards enumerated in the BHC Act (12 U.S.C. 1842(c)). If the proposal also involves the acquisition of a...

  9. Toward a Flying MEMS Robot

    DTIC Science & Technology

    2007-03-01

    63 Figure 45: Proposed energy harvesting and storage system which will be made of polymer solar cells and lithium polymer batteries [35...University of California, Berkeley used four piezoelectric actuators and fiber-reinforced composites in an attempt to achieve lift [9]. The device...Entomopter. The RCM powers the wing flapping motion while the exhaust gasses act as gas bearings between all movable surfaces. The exhaust gasses can

  10. Retrieval as a Fast Route to Memory Consolidation.

    PubMed

    Antony, James W; Ferreira, Catarina S; Norman, Kenneth A; Wimber, Maria

    2017-08-01

    Retrieval-mediated learning is a powerful way to make memories last, but its neurocognitive mechanisms remain unclear. We propose that retrieval acts as a rapid consolidation event, supporting the creation of adaptive hippocampal-neocortical representations via the 'online' reactivation of associative information. We describe parallels between online retrieval and offline consolidation and offer testable predictions for future research. Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  12. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  13. 10 CFR 2.403 - Notice of proposed action on applications for operating licenses pursuant to appendix N of 10 CFR...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... this chapter for operating licenses for nuclear power reactors, if the Commission has not found that a..., Office of Nuclear Reactor Regulation, as appropriate will, prior to acting thereon, cause to be published... licenses pursuant to appendix N of 10 CFR part 50. 2.403 Section 2.403 Energy NUCLEAR REGULATORY COMMISSION...

  14. Modeling and Optimization of Optical Half Adder in Two Dimensional Photonic Crystals

    NASA Astrophysics Data System (ADS)

    Sonth, Mahesh V.; Soma, Savita; Gowre, Sanjaykumar C.; Biradar, Nagashettappa

    2018-05-01

    The output of photonic integrated devices is enhanced using crystal waveguides and cavities but optimization of these devices is a topic of research. In this paper, optimization of the optical half adder in two-dimensional (2-D) linear photonic crystals using four symmetric T-shaped waveguides with 180° phase shift inputs is proposed. The input section of a T-waveguide acts as a beam splitter, and the output section acts as a power combiner. The constructive and destructive interference phenomenon will provide an output optical power. Output port Cout will receive in-phase power through the 180° phase shifter cavity designed near the junction. The optical half adder is modeled in a 2-D photonic crystal using the finite difference time domain method (FDTD). It consists of a cubic lattice with an array of 39 × 43 silicon rods of radius r 0.12 μm and 0.6 μm lattice constant a. The extinction ratio r e of 11.67 dB and 12.51 dB are achieved at output ports using the RSoft FullWAVE-6.1 software package.

  15. Rules implementing Sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978: a regulatory history

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Danziger, R.N.; Caples, P.W.; Huning, J.R.

    1980-09-15

    An analysis is made of the rules implementing Sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA). The act provides that utilities must purchase power from qualifying producers of electricity at nondiscriminatory rates, and it exempts private generators from virtually all state and Federal utility regulations. Most of the analysis presented is taken from the perspective of photovoltaics (PV) and solar thermal electric point-focusing distributed receivers (pfdr). It is felt, however, that the analysis is applicable both to cogeneration and other emerging technologies. Chapters presented are: The FERC Response to Oral Comments on the Proposedmore » Rules Implementing Sections 201 and 210 of PURPA; Additional Changes Made or Not Made That Were Addressed in Other Than Oral Testimony; View on the Proposed Rules Implementing Sections 201 and 210 of PURPA; Response to Comments on the Proposed 201 and 210 Rules; and Summary Analysis of the Environmental Assessment of the Rules. Pertinent reference material is provided in the Appendices, including the text of the rules. (MCW)« less

  16. High-performance combination method of electric network frequency and phase for audio forgery detection in battery-powered devices.

    PubMed

    Savari, Maryam; Abdul Wahab, Ainuddin Wahid; Anuar, Nor Badrul

    2016-09-01

    Audio forgery is any act of tampering, illegal copy and fake quality in the audio in a criminal way. In the last decade, there has been increasing attention to the audio forgery detection due to a significant increase in the number of forge in different type of audio. There are a number of methods for forgery detection, which electric network frequency (ENF) is one of the powerful methods in this area for forgery detection in terms of accuracy. In spite of suitable accuracy of ENF in a majority of plug-in powered devices, the weak accuracy of ENF in audio forgery detection for battery-powered devices, especially in laptop and mobile phone, can be consider as one of the main obstacles of the ENF. To solve the ENF problem in terms of accuracy in battery-powered devices, a combination method of ENF and phase feature is proposed. From experiment conducted, ENF alone give 50% and 60% accuracy for forgery detection in mobile phone and laptop respectively, while the proposed method shows 88% and 92% accuracy respectively, for forgery detection in battery-powered devices. The results lead to higher accuracy for forgery detection with the combination of ENF and phase feature. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  17. Boundary element method for normal non-adhesive and adhesive contacts of power-law graded elastic materials

    NASA Astrophysics Data System (ADS)

    Li, Qiang; Popov, Valentin L.

    2018-03-01

    Recently proposed formulation of the boundary element method for adhesive contacts has been generalized for contacts of power-law graded materials with and without adhesion. Proceeding from the fundamental solution for single force acting on the surface of an elastic half space, first the influence matrix is obtained for a rectangular grid. The inverse problem for the calculation of required stress in the contact area from a known surface displacement is solved using the conjugate-gradient technique. For the transformation between the stresses and displacements, the Fast Fourier Transformation is used. For the adhesive contact of graded material, the detachment criterion based on the energy balance is proposed. The method is validated by comparison with known exact analytical solutions as well as by proving the independence of the mesh size and the grid orientation.

  18. Process engineering concerns in the lunar environment

    NASA Technical Reports Server (NTRS)

    Sullivan, T. A.

    1990-01-01

    The paper discusses the constraints on a production process imposed by the lunar or Martian environment on the space transportation system. A proposed chemical route to produce oxygen from iron oxide bearing minerals (including ilmenite) is presented in three different configurations which vary in complexity. A design for thermal energy storage is presented that could both provide power during the lunar night and act as a blast protection barrier for the outpost. A process to release carbon from the lunar regolith as methane is proposed, capitalizing on the greater abundance and favorable physical properties of methane relative to hydrogen to benefit the entire system.

  19. Multi-Hop Link Capacity of Multi-Route Multi-Hop MRC Diversity for a Virtual Cellular Network

    NASA Astrophysics Data System (ADS)

    Daou, Imane; Kudoh, Eisuke; Adachi, Fumiyuki

    In virtual cellular network (VCN), proposed for high-speed mobile communications, the signal transmitted from a mobile terminal is received by some wireless ports distributed in each virtual cell and relayed to the central port that acts as a gateway to the core network. In this paper, we apply the multi-route MHMRC diversity in order to decrease the transmit power and increase the multi-hop link capacity. The transmit power, the interference power and the link capacity are evaluated for DS-CDMA multi-hop VCN by computer simulation. The multi-route MHMRC diversity can be applied to not only DS-CDMA but also other access schemes (i. e. MC-CDMA, OFDM, etc.).

  20. 18 CFR 366.5 - Allocation of costs for non-power goods and services.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Allocation of costs for non-power goods and services. 366.5 Section 366.5 Conservation of Power and Water Resources FEDERAL... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under...

  1. 18 CFR 366.5 - Allocation of costs for non-power goods and services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Allocation of costs for non-power goods and services. 366.5 Section 366.5 Conservation of Power and Water Resources FEDERAL... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under...

  2. A Proposal for a Longitudinal Study to Assess the Hazards of Radiation in Space Flight

    DTIC Science & Technology

    1985-06-01

    After many lesser surgical procedures for this very painful condition, he eventually underwent complete amputation of his right hand and much of his...specific neoplasm induced from photon irradiation. The incidences of diabetes mellitus and endometriosis , conditions not usually associated with...exposures act multiplicatively on age-specific inci- dence rates. The cohort method has more power and efficiency, valuable in small sample populations such

  3. Health and air quality benefits of policies to reduce coal-fired power plant emissions: a case study in North Carolina.

    PubMed

    Li, Ya-Ru; Gibson, Jacqueline MacDonald

    2014-09-02

    We analyzed sulfur dioxide (SO2) emissions and fine particulate sulfate (PM2.5 sulfate) concentrations in the southeastern United States during 2002-2012, in order to evaluate the health impacts in North Carolina (NC) of the NC Clean Smokestacks Act of 2002. This state law required progressive reductions (beyond those mandated by federal rules) in pollutant emissions from NC's coal-fired power plants. Although coal-fired power plants remain NC's leading SO2 source, a trend analysis shows significant declines in SO2 emissions (-20.3%/year) and PM2.5 sulfate concentrations (-8.7%/year) since passage of the act. Emissions reductions were significantly greater in NC than in neighboring states, and emissions and PM2.5 sulfate concentration reductions were highest in NC's piedmont region, where 9 of the state's 14 major coal-fired power plants are located. Our risk model estimates that these air quality improvements decreased the risk of premature death attributable to PM2.5 sulfate in NC by about 63%, resulting in an estimated 1700 (95% CI: 1500, 1800) deaths prevented in 2012. These findings lend support to recent studies predicting that implementing the proposed federal Cross-State Air Pollution Rule (recently upheld by the U.S. Supreme Court) could substantially decrease U.S. premature deaths attributable to coal-fired power plant emissions.

  4. 18 CFR 366.2 - Commission access to books and records.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... books and records. 366.2 Section 366.2 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal Power Act and the Natural Gas Act § 366.2 Commission access to books and records. (a) In general...

  5. 18 CFR 366.2 - Commission access to books and records.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... books and records. 366.2 Section 366.2 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal Power Act and the Natural Gas Act § 366.2 Commission access to books and records. (a) In general...

  6. 18 CFR 366.2 - Commission access to books and records.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... books and records. 366.2 Section 366.2 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal Power Act and the Natural Gas Act § 366.2 Commission access to books and records. (a) In general...

  7. 18 CFR 366.2 - Commission access to books and records.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... books and records. 366.2 Section 366.2 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal Power Act and the Natural Gas Act § 366.2 Commission access to books and records. (a) In general...

  8. Acoustic energy harvesting based on a planar acoustic metamaterial

    NASA Astrophysics Data System (ADS)

    Qi, Shuibao; Oudich, Mourad; Li, Yong; Assouar, Badreddine

    2016-06-01

    We theoretically report on an innovative and practical acoustic energy harvester based on a defected acoustic metamaterial (AMM) with piezoelectric material. The idea is to create suitable resonant defects in an AMM to confine the strain energy originating from an acoustic incidence. This scavenged energy is converted into electrical energy by attaching a structured piezoelectric material into the defect area of the AMM. We show an acoustic energy harvester based on a meta-structure capable of producing electrical power from an acoustic pressure. Numerical simulations are provided to analyze and elucidate the principles and the performances of the proposed system. A maximum output voltage of 1.3 V and a power density of 0.54 μW/cm3 are obtained at a frequency of 2257.5 Hz. The proposed concept should have broad applications on energy harvesting as well as on low-frequency sound isolation, since this system acts as both acoustic insulator and energy harvester.

  9. 17 CFR 250.14 - Exemption of acquisitions of securities of power supply companies from section 9(a)(2) of the Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... securities of power supply companies from section 9(a)(2) of the Act. 250.14 Section 250.14 Commodity and... of securities of power supply companies from section 9(a)(2) of the Act. (a) An electric utility... exempt from section 9(a)(2) of the Act with respect to the acquisition of any security of a power supply...

  10. 17 CFR 250.14 - Exemption of acquisitions of securities of power supply companies from section 9(a)(2) of the Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... securities of power supply companies from section 9(a)(2) of the Act. 250.14 Section 250.14 Commodity and... of securities of power supply companies from section 9(a)(2) of the Act. (a) An electric utility... exempt from section 9(a)(2) of the Act with respect to the acquisition of any security of a power supply...

  11. DAISY-DAMP: A distributed AI system for the dynamic allocation and management of power

    NASA Technical Reports Server (NTRS)

    Hall, Steven B.; Ohler, Peter C.

    1988-01-01

    One of the critical parameters that must be addressed when designing a loosely coupled Distributed AI SYstem (DAISY) has to do with the degree to which authority is centralized or decentralized. The decision to implement the Dynamic Allocation and Management of Power (DAMP) system as a network of cooperating agents mandated this study. The DAISY-DAMP problem is described; the component agents of the system are characterized; and the communication protocols system elucidated. The motivations and advantages in designing the system with authority decentralized is discussed. Progress in the area of Speech Act theory is proposed as playing a role in constructing decentralized systems.

  12. 33 CFR 209.140 - Operations of the Corps of Engineers under the Federal Power Act.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... structures filed with the Federal Power Commission in connection with licensing of non-Federal hydroelectric... Engineers under the Federal Power Act. 209.140 Section 209.140 Navigation and Navigable Waters CORPS OF... the Corps of Engineers under the Federal Power Act. (a) General. This section outlines policies and...

  13. 33 CFR 209.140 - Operations of the Corps of Engineers under the Federal Power Act.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... structures filed with the Federal Power Commission in connection with licensing of non-Federal hydroelectric... Engineers under the Federal Power Act. 209.140 Section 209.140 Navigation and Navigable Waters CORPS OF... the Corps of Engineers under the Federal Power Act. (a) General. This section outlines policies and...

  14. 33 CFR 209.140 - Operations of the Corps of Engineers under the Federal Power Act.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... structures filed with the Federal Power Commission in connection with licensing of non-Federal hydroelectric... Engineers under the Federal Power Act. 209.140 Section 209.140 Navigation and Navigable Waters CORPS OF... the Corps of Engineers under the Federal Power Act. (a) General. This section outlines policies and...

  15. Multi-User Low Intrusive Occupancy Detection

    PubMed Central

    Widyawan, Widyawan; Lazovik, Alexander

    2018-01-01

    Smart spaces are those that are aware of their state and can act accordingly. Among the central elements of such a state is the presence of humans and their number. For a smart office building, such information can be used for saving energy and safety purposes. While acquiring presence information is crucial, using sensing techniques that are highly intrusive, such as cameras, is often not acceptable for the building occupants. In this paper, we illustrate a proposal for occupancy detection which is low intrusive; it is based on equipment typically available in modern offices such as room-level power-metering and an app running on workers’ mobile phones. For power metering, we collect the aggregated power consumption and disaggregate the load of each device. For the mobile phone, we use the Received Signal Strength (RSS) of BLE (Bluetooth Low Energy) nodes deployed around workspaces to localize the phone in a room. We test the system in our offices. The experiments show that sensor fusion of the two sensing modalities gives 87–90% accuracy, demonstrating the effectiveness of the proposed approach. PMID:29509693

  16. Recovery and resilience after a nuclear power plant disaster: a medical decision model for managing an effective, timely, and balanced response.

    PubMed

    Coleman, C Norman; Blumenthal, Daniel J; Casto, Charles A; Alfant, Michael; Simon, Steven L; Remick, Alan L; Gepford, Heather J; Bowman, Thomas; Telfer, Jana L; Blumenthal, Pamela M; Noska, Michael A

    2013-04-01

    Resilience after a nuclear power plant or other radiation emergency requires response and recovery activities that are appropriately safe, timely, effective, and well organized. Timely informed decisions must be made, and the logic behind them communicated during the evolution of the incident before the final outcome is known. Based on our experiences in Tokyo responding to the Fukushima Daiichi nuclear power plant crisis, we propose a real-time, medical decision model by which to make key health-related decisions that are central drivers to the overall incident management. Using this approach, on-site decision makers empowered to make interim decisions can act without undue delay using readily available and high-level scientific, medical, communication, and policy expertise. Ongoing assessment, consultation, and adaption to the changing conditions and additional information are additional key features. Given the central role of health and medical issues in all disasters, we propose that this medical decision model, which is compatible with the existing US National Response Framework structure, be considered for effective management of complex, large-scale, and large-consequence incidents.

  17. Energy management of an experimental microgrid coupled to a V2G system

    NASA Astrophysics Data System (ADS)

    Mendes, Paulo R. C.; Isorna, Luis Valverde; Bordons, Carlos; Normey-Rico, Julio E.

    2016-09-01

    This paper presents an algorithm for economic optimization of a laboratory microgrid. The microgrid incorporates a hybrid storage system composed of a battery bank and a hydrogen storage and it has a connection with the external electrical network and a charging station for electric vehicles. To study the impact of use of renewable energy power systems, the microgrid has a programmable power supply that can emulate the dynamic behavior of a wind turbine and/or a photovoltaic field. The system modeling was carried out using the Energy Hubs methodology. A hierarchical control structure is proposed based on Model Predictive Control and acting in different time scales, where the first level is responsible for maintaining the microgrid stability and the second level has the task of performing the management of electricity purchase and sale to the power grid, maximize the use of renewable energy sources, manage the use of energy storages and perform the charge of the parked vehicles. Practical experiments were performed with different weather conditions of solar irradiation and wind. The results show a reliable operation of the proposed control system.

  18. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for projects...

  19. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for projects...

  20. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for projects...

  1. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for projects...

  2. 18 CFR 16.18 - Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Annual licenses for projects subject to sections 14 and 15 of the Federal Power Act. 16.18 Section 16.18 Conservation of Power... Projects Subject to Sections 14 and 15 of the Federal Power Act § 16.18 Annual licenses for projects...

  3. Expanding roles within mental health legislation: an opportunity for professional growth or a missed opportunity?

    PubMed

    Hurley, J; Linsley, P

    2007-09-01

    This paper aims to highlight both the necessity, and the way forward for mental health nursing to integrate proposed legislative roles into practice. Argued is that community mental health nursing, historically absent from active participation within mental health law in the UK, is faced with new and demanding roles under proposed changes to the 1983 Mental Health Act of England and Wales. While supporting multidisciplinary training for such roles, the imperative of incorporating nursing specific values into consequent training programs is addressed through the offered educative framework. This framework explores the issues of power, ethics, legislative thematics and application to contemporary service structures.

  4. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashley, Paul

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affectmore » wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project proposals are subjected to a rigorous review process prior to receiving final approval. An eleven-member panel of scientists referred to as the Independent Scientific Review Panel (ISRP) examines project proposals. The ISRP recommends project approval based on scientific merit. The Bonneville Power Administration (BPA), the Columbia Basin Fish and Wildlife Authority (CBFWA), Council staff, the U.S. Fish and Wildlife Service (USFWS), the National Oceanic and Atmospheric Administration (NOAA), and subbasin groups also review project proposals to ensure each project meets regional and subbasin goals and objectives. The Program also includes a public involvement component that gives the public an opportunity to provide meaningful input on management proposals. After a thorough review, the Burns Paiute Tribe (BPT) acquired the Malheur River Mitigation Project (Project) with BPA funds to compensate, in part, for the loss of fish and wildlife resources in the Columbia and Snake River Basins and to address a portion of the mitigation goals identified in the Council's Program (NPPC 2000).« less

  5. Power generator driven by Maxwell's demon

    NASA Astrophysics Data System (ADS)

    Chida, Kensaku; Desai, Samarth; Nishiguchi, Katsuhiko; Fujiwara, Akira

    2017-05-01

    Maxwell's demon is an imaginary entity that reduces the entropy of a system and generates free energy in the system. About 150 years after its proposal, theoretical studies explained the physical validity of Maxwell's demon in the context of information thermodynamics, and there have been successful experimental demonstrations of energy generation by the demon. The demon's next task is to convert the generated free energy to work that acts on the surroundings. Here, we demonstrate that Maxwell's demon can generate and output electric current and power with individual randomly moving electrons in small transistors. Real-time monitoring of electron motion shows that two transistors functioning as gates that control an electron's trajectory so that an electron moves directionally. A numerical calculation reveals that power generation is increased by miniaturizing the room in which the electrons are partitioned. These results suggest that evolving transistor-miniaturization technology can increase the demon's power output.

  6. Power-balancing instantaneous optimization energy management for a novel series-parallel hybrid electric bus

    NASA Astrophysics Data System (ADS)

    Sun, Dongye; Lin, Xinyou; Qin, Datong; Deng, Tao

    2012-11-01

    Energy management(EM) is a core technique of hybrid electric bus(HEB) in order to advance fuel economy performance optimization and is unique for the corresponding configuration. There are existing algorithms of control strategy seldom take battery power management into account with international combustion engine power management. In this paper, a type of power-balancing instantaneous optimization(PBIO) energy management control strategy is proposed for a novel series-parallel hybrid electric bus. According to the characteristic of the novel series-parallel architecture, the switching boundary condition between series and parallel mode as well as the control rules of the power-balancing strategy are developed. The equivalent fuel model of battery is implemented and combined with the fuel of engine to constitute the objective function which is to minimize the fuel consumption at each sampled time and to coordinate the power distribution in real-time between the engine and battery. To validate the proposed strategy effective and reasonable, a forward model is built based on Matlab/Simulink for the simulation and the dSPACE autobox is applied to act as a controller for hardware in-the-loop integrated with bench test. Both the results of simulation and hardware-in-the-loop demonstrate that the proposed strategy not only enable to sustain the battery SOC within its operational range and keep the engine operation point locating the peak efficiency region, but also the fuel economy of series-parallel hybrid electric bus(SPHEB) dramatically advanced up to 30.73% via comparing with the prototype bus and a similar improvement for PBIO strategy relative to rule-based strategy, the reduction of fuel consumption is up to 12.38%. The proposed research ensures the algorithm of PBIO is real-time applicability, improves the efficiency of SPHEB system, as well as suite to complicated configuration perfectly.

  7. Achieving Congestion Mitigation Using Distributed Power Control for Spectrum Sensor Nodes in Sensor Network-Aided Cognitive Radio Ad Hoc Networks

    PubMed Central

    Zhuo, Fan; Duan, Hucai

    2017-01-01

    The data sequence of spectrum sensing results injected from dedicated spectrum sensor nodes (SSNs) and the data traffic from upstream secondary users (SUs) lead to unpredictable data loads in a sensor network-aided cognitive radio ad hoc network (SN-CRN). As a result, network congestion may occur at a SU acting as fusion center when the offered data load exceeds its available capacity, which degrades network performance. In this paper, we present an effective approach to mitigate congestion of bottlenecked SUs via a proposed distributed power control framework for SSNs over a rectangular grid based SN-CRN, aiming to balance resource load and avoid excessive congestion. To achieve this goal, a distributed power control framework for SSNs from interior tier (IT) and middle tier (MT) is proposed to achieve the tradeoff between channel capacity and energy consumption. In particular, we firstly devise two pricing factors by considering stability of local spectrum sensing and spectrum sensing quality for SSNs. By the aid of pricing factors, the utility function of this power control problem is formulated by jointly taking into account the revenue of power reduction and the cost of energy consumption for IT or MT SSN. By bearing in mind the utility function maximization and linear differential equation constraint of energy consumption, we further formulate the power control problem as a differential game model under a cooperation or noncooperation scenario, and rigorously obtain the optimal solutions to this game model by employing dynamic programming. Then the congestion mitigation for bottlenecked SUs is derived by alleviating the buffer load over their internal buffers. Simulation results are presented to show the effectiveness of the proposed approach under the rectangular grid based SN-CRN scenario. PMID:28914803

  8. 18 CFR 367.1440 - Account 144, Accumulated provision for uncollectible accounts-Credit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Current and Accrued Assets § 367...

  9. 18 CFR 367.1080 - Account 108, Accumulated provision for depreciation of service company property.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts § 367.1080..., Accumulated provision for depreciation of service company property. 367.1080 Section 367.1080 Conservation of... THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM...

  10. 18 CFR 367.1430 - Account 143, Other accounts receivable.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL...

  11. 18 CFR 367.24 - Construction and service contracts for other companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... service company undertakes projects to construct physical property for associate or non-associate... COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED... POWER ACT AND NATURAL GAS ACT General Instructions § 367.24 Construction and service contracts for other...

  12. 18 CFR 367.1240 - Account 124, Other investments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS...

  13. 18 CFR 367.54 - Expenditures on leased property.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS...

  14. 18 CFR 367.2160 - Account 216, Unappropriated retained earnings.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 216, Unappropriated retained earnings. 367.2160 Section 367.2160 Conservation of Power and Water Resources FEDERAL... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE...

  15. 18 CFR 367.1310 - Account 131, Cash.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT Balance Sheet... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 131, Cash. 367.1310 Section 367.1310 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...

  16. 18 CFR 367.2150 - Account 215, Appropriated retained earnings.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 215, Appropriated retained earnings. 367.2150 Section 367.2150 Conservation of Power and Water Resources FEDERAL... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE...

  17. Generation of ultra-wide and flat optical frequency comb based on electro absorption modulator

    NASA Astrophysics Data System (ADS)

    Ujjwal; Thangaraj, Jaisingh

    2018-05-01

    A novel technique is proposed for the generation of ultra-wide and flat optical frequency comb (OFC) based on serially cascading three stages of electro absorption modulators (EAMs) through sinusoidal radio frequency (RF) signals by setting frequencies at f GHz, f/2 GHz and f/4 GHz. Here, the first stage acts as subcarrier generator, the second stage acts as subcarrier doubler, and the third stage acts as subcarrier quadrupler. In addition, a higher number of subcarriers can easily be generated by adjusting the driving sinusoidal RF signal. In this paper, cascading three stages of EAMs driven by 50 GHz, 25 GHz and 12.5 GHz clock sources, we obtain 272 subcarriers with spacing of 2.5 GHz and power deviation within 1 dB. Theoretical analysis of serially cascaded EAMs for subcarrier generation is also investigated. Principal analysis and simulation of this technique are demonstrated.

  18. Probing the Merger in ACT-CL J0256.5+0006: Understanding Low-Power Radio Halos

    NASA Astrophysics Data System (ADS)

    Sarazin, Craig

    2017-09-01

    ACT-CL J0256.5+0006 (J0256) is a moderate redshift (z=0.363) merging cluster. We recently detected a cluster giant radio halo which is one of the weakest known. Based on our ACT SZ detection and a very short XMM observation, J0256 has the weakest SZ and possibly the lowest mass ever observed for a radio halo. Our proposed Chandra observation will give J0256's dynamical merger state and an accurate mass. This may be an early stage merger, which challenges the theory that halos are produced by turbulent re-acceleration after the passage of merger shocks. We will search for shocks and cold fronts, and derive the merger speed. We will learn if this weak radio halo is due to an early-stage merger, a late merger, or a low cluster mass, useful for future low frequency radio surveys.

  19. A Study of LoRa: Long Range & Low Power Networks for the Internet of Things

    PubMed Central

    Augustin, Aloÿs; Yi, Jiazi; Clausen, Thomas; Townsley, William Mark

    2016-01-01

    LoRa is a long-range, low-power, low-bitrate, wireless telecommunications system, promoted as an infrastructure solution for the Internet of Things: end-devices use LoRa across a single wireless hop to communicate to gateway(s), connected to the Internet and which act as transparent bridges and relay messages between these end-devices and a central network server. This paper provides an overview of LoRa and an in-depth analysis of its functional components. The physical and data link layer performance is evaluated by field tests and simulations. Based on the analysis and evaluations, some possible solutions for performance enhancements are proposed. PMID:27618064

  20. A Study of LoRa: Long Range & Low Power Networks for the Internet of Things.

    PubMed

    Augustin, Aloÿs; Yi, Jiazi; Clausen, Thomas; Townsley, William Mark

    2016-09-09

    LoRa is a long-range, low-power, low-bitrate, wireless telecommunications system, promoted as an infrastructure solution for the Internet of Things: end-devices use LoRa across a single wireless hop to communicate to gateway(s), connected to the Internet and which act as transparent bridges and relay messages between these end-devices and a central network server. This paper provides an overview of LoRa and an in-depth analysis of its functional components. The physical and data link layer performance is evaluated by field tests and simulations. Based on the analysis and evaluations, some possible solutions for performance enhancements are proposed.

  1. 18 CFR 367.4120 - Account 412, Cost and expenses of construction or other services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... undertakes projects to construct physical property for associate or non-associate companies (see General... HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR..., FEDERAL POWER ACT AND NATURAL GAS ACT Income Statement Chart of Accounts Service Company Operating Income...

  2. Tracking and data relay satellite fault isolation and correction using PACES: Power and attitude control expert system

    NASA Technical Reports Server (NTRS)

    Erikson, Carol-Lee; Hooker, Peggy

    1989-01-01

    The Power and Attitude Control Expert System (PACES) is an object oriented and rule based expert system which provides spacecraft engineers with assistance in isolating and correcting problems within the Power and Attitude Control Subsystems of the Tracking and Data Relay Satellites (TDRS). PACES is designed to act in a consultant role. It will not interface to telemetry data, thus preserving full operator control over spacecraft operations. The spacecraft engineer will input requested information. This information will include telemetry data, action being performed, problem characteristics, spectral characteristics, and judgments of spacecraft functioning. Questions are answered either by clicking on appropriate responses (for text), or entering numeric values. A context sensitive help facility allows access to additional information when the user has difficulty understanding a question or deciding on an answer. The major functionality of PACES is to act as a knowledge rich system which includes block diagrams, text, and graphics, linked using hypermedia techniques. This allows easy movement among pieces of the knowledge. Considerable documentation of the spacecraft Power and Attitude Control Subsystems is embedded within PACES. The development phase of TDRSS expert system technology is intended to provide NASA with the necessary expertise and capability to define requirements, evaluate proposals, and monitor the development progress of a highly competent expert system for NASA's Tracking and Data Relay Satellite Program.

  3. 78 FR 4833 - Order Denying Export Privileges

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... violating the International Emergency Economic Powers Act (50 U.S.C. 1701, et seq. (2000 & Supp. IV 2010... order issued under the International Emergency Economic Powers Act (50 U.S.C. 1701-1706); 18 U.S.C. 793... effect under the International Emergency Economic Powers Act (50 U.S.C. 1701, et seq. (2000 & Supp. IV...

  4. 77 FR 68768 - Electricity Market Transparency Provisions of Section 220 of the Federal Power Act; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM10-12-000] Electricity Market Transparency Provisions of Section 220 of the Federal Power Act; Notice of Technical Conference...., Washington, DC 20426. \\1\\ Electricity Market Transparency Provisions of Section 220 of the Federal Power Act...

  5. 18 CFR 367.9302 - Account 930.2, Miscellaneous general expenses.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 930.2, Miscellaneous general expenses. 367.9302 Section 367.9302 Conservation of Power and Water Resources FEDERAL... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE...

  6. 18 CFR 367.1070 - Account 107, Construction work in progress.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 107, Construction work in progress. 367.1070 Section 367.1070 Conservation of Power and Water Resources FEDERAL... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE...

  7. 18 CFR 367.1880 - Account 188, Research, development, or demonstration expenditures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 188, Research, development, or demonstration expenditures. 367.1880 Section 367.1880 Conservation of Power and Water... HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR...

  8. 18 CFR 367.1900 - Account 190, Accumulated deferred income taxes.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 190, Accumulated deferred income taxes. 367.1900 Section 367.1900 Conservation of Power and Water Resources FEDERAL... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE...

  9. 18 CFR 367.2110 - Account 211, Miscellaneous paid-in capital.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 211, Miscellaneous paid-in capital. 367.2110 Section 367.2110 Conservation of Power and Water Resources FEDERAL... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE...

  10. 18 CFR 367.2230 - Account 223, Advances from associate companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 223, Advances from associate companies. 367.2230 Section 367.2230 Conservation of Power and Water Resources FEDERAL... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE...

  11. 18 CFR 367.4350 - Account 435, Extraordinary deductions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 435, Extraordinary deductions. 367.4350 Section 367.4350 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT...

  12. 18 CFR 367.4340 - Account 434, Extraordinary income.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 434, Extraordinary income. 367.4340 Section 367.4340 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFOR...

  13. 18 CFR 367.2830 - Account 283, Accumulated deferred income taxes-Other.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 283, Accumulated deferred income taxes-Other. 367.2830 Section 367.2830 Conservation of Power and Water Resources... COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED...

  14. 18 CFR 367.2820 - Account 282, Accumulated deferred income taxes-Other property.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 282, Accumulated deferred income taxes-Other property. 367.2820 Section 367.2820 Conservation of Power and Water... HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR...

  15. Flexible and Robust Thermoelectric Generators Based on All-Carbon Nanotube Yarn without Metal Electrodes.

    PubMed

    Choi, Jaeyoo; Jung, Yeonsu; Yang, Seung Jae; Oh, Jun Young; Oh, Jinwoo; Jo, Kiyoung; Son, Jeong Gon; Moon, Seung Eon; Park, Chong Rae; Kim, Heesuk

    2017-08-22

    As practical interest in flexible/or wearable power-conversion devices increases, the demand for high-performance alternatives to thermoelectric (TE) generators based on brittle inorganic materials is growing. Herein, we propose a flexible and ultralight TE generator (TEG) based on carbon nanotube yarn (CNTY) with excellent TE performance. The as-prepared CNTY shows a superior electrical conductivity of 3147 S/cm due to increased longitudinal carrier mobility derived from a highly aligned structure. Our TEG is innovative in that the CNTY acts as multifunctions in the same device. The CNTY is alternatively doped into n- and p-types using polyethylenimine and FeCl 3 , respectively. The highly conductive CNTY between the doped regions is used as electrodes to minimize the circuit resistance, thereby forming an all-carbon TEG without additional metal deposition. A flexible TEG based on 60 pairs of n- and p-doped CNTY shows the maximum power density of 10.85 and 697 μW/g at temperature differences of 5 and 40 K, respectively, which are the highest values among reported TEGs based on flexible materials. We believe that the strategy proposed here to improve the power density of flexible TEG by introducing highly aligned CNTY and designing a device without metal electrodes shows great potential for the flexible/or wearable power-conversion devices.

  16. PURPA 210 avoided cost rates: Economic and implementation issues

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Devine, M.D.; Chartock, M.A.; Gunn, E.M.

    The purpose of Section 210 of the Public Utilities Regulatory Policies Act (PURPA) was to promote the utilization of waste and renewable fuels and cogeneration processes for increasing electric power supplies. It represents a radical change in policy by allowing financially unregulated parties to generate power in ''qualifying facilities'' and by requiring utilities to purchase this power at the utilities' marginal (or ''avoided'') cost. PURPA 210 has clearly had a major impact as measured by the actual and proposed number of new qualifying facilities; however, implementation has been difficult due to the adversarial nature of the process for negotiating ormore » setting the avoided cost rates. This paper reviews the pertinent PURPA rules and regulations, analyzes the status of current avoided cost rates that have been established, and discusses implementation issues and options for resolving those issues.« less

  17. 18 CFR 4.101 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...

  18. 18 CFR 4.101 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...

  19. 18 CFR 4.101 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...

  20. 18 CFR 4.101 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...

  1. 18 CFR 4.101 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...

  2. ACTS Battery and Solar Array Assembly On-Orbit Measured Performance

    NASA Technical Reports Server (NTRS)

    Hilderman, Don R.

    2005-01-01

    The Advanced Communications Technology Satellite (ACTS) is a NASA experimental communications satellite system designed to demonstrate on-orbit Ka-band communications and switching technologies that will be used by NASA and the commercial sector in the 21st century. The ACTS was launched on September 12, 1993, and has performed over 10 years of successful experimental operations. The purpose of this report is to describe the ACTS power subsystem and the ACTS solar array and battery assemblies located within the power subsystem and then to document on-orbit measured performance from launch to mission end on April 28, 2004. Solar array and battery performance data is presented, and respective conclusions are drawn. The total solar array power available to the spacecraft was measured each year at the same time, and battery voltage performance was measured twice per year at the same times during peak solar eclipse. At the highest spacecraft power demand, the ACTS uses approximately 1113 W of electrical power during the low-burstrate experiment to operate all six satellite subsystems. After 10 years of on-orbit operation, solar array available output power normal to the Sun measured 1508 W, which represents 395 W of excess margin. The ACTS batteries have successfully supported the ACTS experiment program for over 10 years and operated in excess of 900 charge and discharge cycles through 21 eclipse seasons.

  3. 78 FR 61953 - Order Denying Export Privileges

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-08

    ..., Timothy Gormley (``Gormley''), was convicted of violating the International Emergency Economic Powers Act... Economic Powers Act (50 U.S.C. 1701-1706); 18 U.S.C. 793, 794 or 798; section 4(b) of the Internal Security... Emergency Economic Powers Act (50 U.S.C. 1701, et seq. (2006 & Supp. IV 2010)). I have received notice of...

  4. Experimental evaluation of open-loop UpLink Power Control using ACTS

    NASA Technical Reports Server (NTRS)

    Dissanayake, Asoka

    1995-01-01

    The present investigation deals with the implementation of open-loop up-link power control using a beacon signal in the down-link frequency band as the control parameter. A power control system was developed and tested using the ACTS satellite. ACTS carries beacon signals in both up- and down-link bands with which the relationship between the up- and down-link fading can be established. A power controlled carrier was transmitted to the ACTS satellite from a NASA operated ground station and the transponded signal was received at COMSAT Laboratories using a terminal that was routinely used to monitor the two ACTS beacon signals. The experiment ran for a period of approximately six months and the collected data were used to evaluate the performance of the power control system. A brief review of propagation factors involved in estimating the up-link fade using a beacon signal in the down-link band are presented. The power controller design and the experiment configuration are discussed. Results of the experiment are discussed.

  5. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  6. 18 CFR 367.3060 - Account 306, Leasehold improvements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS... installation of additional facilities in rented offices or buildings to suit tenant's needs, placed in service...

  7. 43 CFR 431.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...

  8. 43 CFR 431.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...

  9. 43 CFR 431.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...

  10. 43 CFR 431.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...

  11. 43 CFR 431.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... restore the Project to a former good operating condition. Colorado River Dam Fund or Fund shall mean that... specified in the Project Act, the Adjustment Act, the Colorado River Basin Project Act, and the Hoover Power... electric service pursuant to the Hoover Power Plant Act. Project or Boulder Canyon Project shall mean all...

  12. Petroleum marketing prices. Hearing before the Subcommittee on Energy and Power of the Committee on Energy and Commerce, House of Representatives, One Hundred Third Congress, First Session on H.R. 1520, May 19, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The hearing addresses H.R. 1520 a bill that proposes to amend the Petroleum Marketing Practices Act to clarify federal standards governing the termination and nonrenewal of franchise and franchise relationships for the sale of motor fuel. The legislative text of the Bill is given with amendments. Statements of witnesses and documents submitted for the record are included.

  13. Otto engine beyond its standard quantum limit.

    PubMed

    Leggio, Bruno; Antezza, Mauro

    2016-02-01

    We propose a quantum Otto cycle based on the properties of a two-level system in a realistic out-of-thermal-equilibrium electromagnetic field acting as its sole reservoir. This steady configuration is produced without the need of active control over the state of the environment, which is a noncoherent thermal radiation, sustained only by external heat supplied to macroscopic objects. Remarkably, even for nonideal finite-time transformations, it largely over-performs the standard ideal Otto cycle and asymptotically achieves unit efficiency at finite power.

  14. Embedded Streaming Deep Neural Networks Accelerator With Applications.

    PubMed

    Dundar, Aysegul; Jin, Jonghoon; Martini, Berin; Culurciello, Eugenio

    2017-07-01

    Deep convolutional neural networks (DCNNs) have become a very powerful tool in visual perception. DCNNs have applications in autonomous robots, security systems, mobile phones, and automobiles, where high throughput of the feedforward evaluation phase and power efficiency are important. Because of this increased usage, many field-programmable gate array (FPGA)-based accelerators have been proposed. In this paper, we present an optimized streaming method for DCNNs' hardware accelerator on an embedded platform. The streaming method acts as a compiler, transforming a high-level representation of DCNNs into operation codes to execute applications in a hardware accelerator. The proposed method utilizes maximum computational resources available based on a novel-scheduled routing topology that combines data reuse and data concatenation. It is tested with a hardware accelerator implemented on the Xilinx Kintex-7 XC7K325T FPGA. The system fully explores weight-level and node-level parallelizations of DCNNs and achieves a peak performance of 247 G-ops while consuming less than 4 W of power. We test our system with applications on object classification and object detection in real-world scenarios. Our results indicate high-performance efficiency, outperforming all other presented platforms while running these applications.

  15. 18 CFR 33.7 - Verification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Verification. 33.7 Section 33.7 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT APPLICATIONS UNDER FEDERAL POWER ACT SECTION 203 § 33.7...

  16. 18 CFR 40.1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT MANDATORY RELIABILITY STANDARDS FOR THE BULK-POWER SYSTEM... in section 201(f) of the Federal Power Act. (b) Each Reliability Standard made effective by § 40.2... Reliability Standard applies. ...

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nielsen, Michael A.; School of Information Technology and Electrical Engineering, University of Queensland, Brisbane, Queensland 4072; Dawson, Christopher M.

    The one-way quantum computing model introduced by Raussendorf and Briegel [Phys. Rev. Lett. 86, 5188 (2001)] shows that it is possible to quantum compute using only a fixed entangled resource known as a cluster state, and adaptive single-qubit measurements. This model is the basis for several practical proposals for quantum computation, including a promising proposal for optical quantum computation based on cluster states [M. A. Nielsen, Phys. Rev. Lett. (to be published), quant-ph/0402005]. A significant open question is whether such proposals are scalable in the presence of physically realistic noise. In this paper we prove two threshold theorems which showmore » that scalable fault-tolerant quantum computation may be achieved in implementations based on cluster states, provided the noise in the implementations is below some constant threshold value. Our first threshold theorem applies to a class of implementations in which entangling gates are applied deterministically, but with a small amount of noise. We expect this threshold to be applicable in a wide variety of physical systems. Our second threshold theorem is specifically adapted to proposals such as the optical cluster-state proposal, in which nondeterministic entangling gates are used. A critical technical component of our proofs is two powerful theorems which relate the properties of noisy unitary operations restricted to act on a subspace of state space to extensions of those operations acting on the entire state space. We expect these theorems to have a variety of applications in other areas of quantum-information science.« less

  18. Educational Excellence for All Children Act of 1999: An Overview of the Clinton Administration's Proposal To Reauthorize the Elementary and Secondary Education Act.

    ERIC Educational Resources Information Center

    Department of Education, Washington, DC.

    This volume discusses "Educational Excellence for All Children Act of 1999, the proposed reauthorization of the Elementary and Secondary Education Act (ESEA), which was established in 1965 as part of Lyndon Johnson's "War on Poverty" program. The proposed 1999 Act builds upon the 1994 reauthorization of ESEA titled "Improving…

  19. 78 FR 42802 - Notice of Lodging of Proposed Consent Decree Under the Clean Water Act, Clean Air Act, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-17

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under the Clean Water Act, Clean Air Act, and Resource Conservation and Recovery Act On July 11, 2013, the Department of Justice lodged a proposed consent decree with the United States District Court for the Western District of Arkansas in the lawsuit entitled United States v....

  20. Analysis of PURPA and solar energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rice, M.

    The Public Utility Regulatory Policies Act of 1978 (PURPA) is designed to promote energy conservation, the efficient use of utility resources, and equitable rates. PURPA specifically directs the Federal Energy Regulatory Commission (FERC) to encourage small power production from renewable resources (and also cogeneration of electric energy as well as heat) by setting standards under which facilities qualify for interconnection, and guidelines for sales between utilities and independent facilities. The way FERC carries out this mandate may critically affect the development of solar alternatives to electric power production from fossil and nuclear resources. This report comments on proposed FERC regulationsmore » and suggests ways to encourage small power production within the PURPA mandate. In addition, some internal strains within PURPA are analyzed that seem to limit the effectiveness with which FERC can encourage independent facilities, and possible modifications to PURPA are suggested. 255 references.« less

  1. Applying and adapting the Swedish regulatory system for decommissioning to nuclear power reactors - The regulator's perspective.

    PubMed

    Amft, Martin; Leisvik, Mathias; Carroll, Simon

    2017-03-16

    Half of the original 13 Swedish nuclear power reactors will be shut down by 2020. The decommissioning of these reactors is a challenge for all parties involved, including the licensees, the waste management system, the financing system, and the Swedish Radiation Safety Authority (SSM). This paper presents an overview of the Swedish regulations for decommissioning of nuclear facilities. It describes some of the experiences that SSM has gained from the application of these regulations. The focus of the present paper is on administrative aspects of decommissioning, such as SSM's guidelines, the definition of fundamental concepts in the regulatory framework, and a proposed revision of the licensing process according to the Environmental Act. These improvements will help to streamline the administration of the commercial nuclear power plant decommissioning projects that are anticipated to commence in Sweden in the near future. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. National Energy Legislation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-12-31

    The impact of state regulation of nuclear power, since PG&E and Silkwood, on the implementation of national energy policy on nuclear power is evident in the debates on federal legislation required for such implementation. The political demands that confront some states for an expanded role in the regulation of commercial nuclear power plants also confront Congress, which is responsible for the legislative implementation of the strategy proposed in the Report. The expansion of state and local regulation of nuclear plants, however, will complicate and possibly frustrate the efforts of Congress to enact the strategy for nuclear power into law. Themore » debates on Senate Bill 1220, the National Energy Security Act of 1991, indicate that the expansion of state regulation of nuclear power will frustrate the implementation of the national energy policy on nuclear power. Senate Bill 1220 would enact a comprehensive national energy policy. For example, Title XI would further deregulate the production of natural gas; Title XIV is concerned with secure supplies, and the use of coal in the future. Senate Bill 1220 would also amend PUHCA. Of particular significance for nuclear power, however, are Titles VIII and IX. The House and Senate debates on House Bill 1301 and Senate Bill 1220 are summarized.« less

  3. 18 CFR 1316.4 - Buy American Act supply contracts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Buy American Act supply contracts. 1316.4 Section 1316.4 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... American Act Supply Contracts (a) In TVA's acquisition of end products, the Buy American Act (41 U.S.C. 10a...

  4. 18 CFR 1316.4 - Buy American Act supply contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Buy American Act supply contracts. 1316.4 Section 1316.4 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... American Act Supply Contracts (a) In TVA's acquisition of end products, the Buy American Act (41 U.S.C. 10a...

  5. 18 CFR 1316.4 - Buy American Act supply contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Buy American Act supply contracts. 1316.4 Section 1316.4 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... American Act Supply Contracts (a) In TVA's acquisition of end products, the Buy American Act (41 U.S.C. 10a...

  6. 18 CFR 1316.4 - Buy American Act supply contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Buy American Act supply contracts. 1316.4 Section 1316.4 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... American Act Supply Contracts (a) In TVA's acquisition of end products, the Buy American Act (41 U.S.C. 10a...

  7. Study on high breakdown voltage GaN-based vertical field effect transistor with interfacial charge engineering for power applications

    NASA Astrophysics Data System (ADS)

    Du, Jiangfeng; Liu, Dong; Liu, Yong; Bai, Zhiyuan; Jiang, Zhiguang; Liu, Yang; Yu, Qi

    2017-11-01

    A high voltage GaN-based vertical field effect transistor with interfacial charge engineering (GaN ICE-VFET) is proposed and its breakdown mechanism is presented. This vertical FET features oxide trenches which show a fixed negative charge at the oxide/GaN interface. In the off-state, firstly, the trench oxide layer acts as a field plate; secondly, the n-GaN buffer layer is inverted along the oxide/GaN interface and thus a vertical hole layer is formed, which acts as a virtual p-pillar and laterally depletes the n-buffer pillar. Both of them modulate electric field distribution in the device and significantly increase the breakdown voltage (BV). Compared with a conventional GaN vertical FET, the BV of GaN ICE-VFET is increased from 1148 V to 4153 V with the same buffer thickness of 20 μm. Furthermore, the proposed device achieves a great improvement in the tradeoff between BV and on-resistance; and its figure of merit even exceeds the GaN one-dimensional limit.

  8. 43 CFR 431.1 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... facilities at the Hoover Powerplant, and also to promulgate regulations as the Secretary finds necessary and... supplemented (Adjustment Act), and the Hoover Power Plant Act of 1984 (Hoover Power Plant Act), the Bureau of... of the Colorado River Dam Fund (Fund), and methods for resolving disputes. ...

  9. 43 CFR 431.1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... facilities at the Hoover Powerplant, and also to promulgate regulations as the Secretary finds necessary and... supplemented (Adjustment Act), and the Hoover Power Plant Act of 1984 (Hoover Power Plant Act), the Bureau of... of the Colorado River Dam Fund (Fund), and methods for resolving disputes. ...

  10. 43 CFR 431.1 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facilities at the Hoover Powerplant, and also to promulgate regulations as the Secretary finds necessary and... supplemented (Adjustment Act), and the Hoover Power Plant Act of 1984 (Hoover Power Plant Act), the Bureau of... of the Colorado River Dam Fund (Fund), and methods for resolving disputes. ...

  11. 43 CFR 431.1 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... facilities at the Hoover Powerplant, and also to promulgate regulations as the Secretary finds necessary and... supplemented (Adjustment Act), and the Hoover Power Plant Act of 1984 (Hoover Power Plant Act), the Bureau of... of the Colorado River Dam Fund (Fund), and methods for resolving disputes. ...

  12. 43 CFR 431.1 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... facilities at the Hoover Powerplant, and also to promulgate regulations as the Secretary finds necessary and... supplemented (Adjustment Act), and the Hoover Power Plant Act of 1984 (Hoover Power Plant Act), the Bureau of... of the Colorado River Dam Fund (Fund), and methods for resolving disputes. ...

  13. Investigation of Grating-Assisted Trimodal Interferometer Biosensors Based on a Polymer Platform.

    PubMed

    Liang, Yuxin; Zhao, Mingshan; Wu, Zhenlin; Morthier, Geert

    2018-05-10

    A grating-assisted trimodal interferometer biosensor is proposed and numerically analyzed. A long period grating coupler, for adjusting the power between the fundamental mode and the second higher order mode, is investigated, and is shown to act as a conventional directional coupler for adjusting the power between the two arms. The trimodal interferometer can achieve maximal fringe visibility when the powers of the two modes are adjusted to the same value by the grating coupler, which means that a better limit of detection can be expected. In addition, the second higher order mode typically has a larger evanescent tail than the first higher order mode in bimodal interferometers, resulting in a higher sensitivity of the trimodal interferometer. The influence of fabrication tolerances on the performance of the designed interferometer is also investigated. The power difference between the two modes shows inertia to the fill factor of the grating, but high sensitivity to the modulation depth. Finally, a 2050 2π/RIU (refractive index unit) sensitivity and 43 dB extinction ratio of the output power are achieved.

  14. 18 CFR 367.104 - Accounts 410.1, 410.2, 411.1, and 411.2, Provision for deferred income taxes.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Accounts 410.1, 410.2, 411.1, and 411.2, Provision for deferred income taxes. 367.104 Section 367.104 Conservation of Power... ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT Special Instructions § 367.104 Accounts 410.1, 410...

  15. 77 FR 10487 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... 203 of the Federal Power Act of American Electric Power Service Corporation. Filed Date: 2/10/12.../10/12. Accession Number: 20120210-5053. Comments Due: 5 p.m. ET 3/27/12. Docket Numbers: EC12-71-000... Power Act of American Electric Power Service Corporation. Filed Date: 2/10/12. Accession Number...

  16. Cluster Cooperation in Wireless-Powered Sensor Networks: Modeling and Performance Analysis.

    PubMed

    Zhang, Chao; Zhang, Pengcheng; Zhang, Weizhan

    2017-09-27

    A wireless-powered sensor network (WPSN) consisting of one hybrid access point (HAP), a near cluster and the corresponding far cluster is investigated in this paper. These sensors are wireless-powered and they transmit information by consuming the harvested energy from signal ejected by the HAP. Sensors are able to harvest energy as well as store the harvested energy. We propose that if sensors in near cluster do not have their own information to transmit, acting as relays, they can help the sensors in a far cluster to forward information to the HAP in an amplify-and-forward (AF) manner. We use a finite Markov chain to model the dynamic variation process of the relay battery, and give a general analyzing model for WPSN with cluster cooperation. Though the model, we deduce the closed-form expression for the outage probability as the metric of this network. Finally, simulation results validate the start point of designing this paper and correctness of theoretical analysis and show how parameters have an effect on system performance. Moreover, it is also known that the outage probability of sensors in far cluster can be drastically reduced without sacrificing the performance of sensors in near cluster if the transmit power of HAP is fairly high. Furthermore, in the aspect of outage performance of far cluster, the proposed scheme significantly outperforms the direct transmission scheme without cooperation.

  17. Cluster Cooperation in Wireless-Powered Sensor Networks: Modeling and Performance Analysis

    PubMed Central

    Zhang, Chao; Zhang, Pengcheng; Zhang, Weizhan

    2017-01-01

    A wireless-powered sensor network (WPSN) consisting of one hybrid access point (HAP), a near cluster and the corresponding far cluster is investigated in this paper. These sensors are wireless-powered and they transmit information by consuming the harvested energy from signal ejected by the HAP. Sensors are able to harvest energy as well as store the harvested energy. We propose that if sensors in near cluster do not have their own information to transmit, acting as relays, they can help the sensors in a far cluster to forward information to the HAP in an amplify-and-forward (AF) manner. We use a finite Markov chain to model the dynamic variation process of the relay battery, and give a general analyzing model for WPSN with cluster cooperation. Though the model, we deduce the closed-form expression for the outage probability as the metric of this network. Finally, simulation results validate the start point of designing this paper and correctness of theoretical analysis and show how parameters have an effect on system performance. Moreover, it is also known that the outage probability of sensors in far cluster can be drastically reduced without sacrificing the performance of sensors in near cluster if the transmit power of HAP is fairly high. Furthermore, in the aspect of outage performance of far cluster, the proposed scheme significantly outperforms the direct transmission scheme without cooperation. PMID:28953231

  18. 75 FR 29782 - Notice of Proposed Consent Decree and Proposed Order on Consent Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-27

    ... DEPARTMENT OF JUSTICE Notice of Proposed Consent Decree and Proposed Order on Consent Under the Clean Water Act Notice is hereby given that, on May 18, 2010, a proposed Consent Decree in United States... 301(a) and 504(a) of the Clean Water Act, 33 U.S.C. 1311(a) & 1364(a), in connection with un-permitted...

  19. 76 FR 64379 - Notice of Lodging of Proposed Consent Decree Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under the Clean Water Act Notice is hereby given that on October 7, 2011, a proposed Consent Decree in United States, et al. v. the... the Western District of North Carolina. The proposed Consent Decree in this Clean Water Act...

  20. 18 CFR 2.22 - Pricing policy for transmission services provided under the Federal Power Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Pricing policy for transmission services provided under the Federal Power Act. 2.22 Section 2.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND...

  1. 18 CFR 2.22 - Pricing policy for transmission services provided under the Federal Power Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Pricing policy for transmission services provided under the Federal Power Act. 2.22 Section 2.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND...

  2. 18 CFR 2.22 - Pricing policy for transmission services provided under the Federal Power Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Pricing policy for transmission services provided under the Federal Power Act. 2.22 Section 2.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND...

  3. 18 CFR 2.22 - Pricing policy for transmission services provided under the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Pricing policy for transmission services provided under the Federal Power Act. 2.22 Section 2.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND...

  4. 77 FR 60170 - Americans With Disabilities Act: Proposed Circular Chapter, Vehicle Acquisition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    ... With Disabilities Act: Proposed Circular Chapter, Vehicle Acquisition AGENCY: Federal Transit...) Americans with Disabilities Act (ADA) regulations. This proposed chapter on vehicle acquisition is the first... requirements transportation providers must follow to ensure their services, vehicles, and facilities are...

  5. 24 CFR 1000.114 - How long does HUD have to review and act on a proposal to provide assistance to non low-income...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and act on a proposal to provide assistance to non low-income Indian families or a model housing... does HUD have to review and act on a proposal to provide assistance to non low-income Indian families... calendar days after receiving the proposal to notify the recipient in writing that the proposal to provide...

  6. 78 FR 30299 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ... Securities Under Section 204 of the Federal Power Act of Upper Peninsula Power Company. Filed Date: 5/15/13... Federal Power Act and Requests for Expedited Consideration and Confidential Treatment of Wapsipinicon Wind...-1017-000. Applicants: Consumers Energy Company, CMS Energy Resource Management Company. Description...

  7. Analysis of S.1844, the Clear Skies Act of 2003; S. 843, the Clean Air Planning Act of 2003; and S. 366, the Clean Power Act of 2003

    EIA Publications

    2004-01-01

    Senator James M. Inhofe requested that the Energy Information Administration (EIA) undertake analysis of S.843, the Clean Air Planning Act of 2003, introduced by Senator Thomas Carper; S.366, the Clean Power Act of 2003, introduced by Senator James Jeffords; and S.1844, the Clear Skies Act of 2003, introduced by Senator James M. Inhofe. The EIA received this request on March 19, 2004. This Service Report responds to his request.

  8. 18 CFR 4.107 - Contents of application for exemption from licensing.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES... 5 megawatts or less, from licensing under the Federal Power Act. [If applicable: The project is... each applicant are: (4) The exact name and business address of each person authorized to act as agent...

  9. 18 CFR 4.92 - Contents of exemption application.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION..., except paragraph (b)(28)(v)”], from certain provisions of Part I of the Federal Power Act. The location... address of each applicant is: The exact name and business address of each person authorized to act as...

  10. 18 CFR 4.107 - Contents of application for exemption from licensing.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES... 5 megawatts or less, from licensing under the Federal Power Act. [If applicable: The project is... each applicant are: (4) The exact name and business address of each person authorized to act as agent...

  11. 18 CFR 4.61 - Contents of application.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION... each person authorized to act as agent for the applicant in this application, if applicable, are: (5... section 7(a) of the Federal Power Act. See 16 U.S.C. 796. (6)(i) The statutory or regulatory requirements...

  12. 18 CFR 4.92 - Contents of exemption application.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION..., except paragraph (b)(28)(v)”], from certain provisions of Part I of the Federal Power Act. The location... address of each applicant is: The exact name and business address of each person authorized to act as...

  13. 18 CFR 4.92 - Contents of exemption application.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION..., except paragraph (b)(28)(v)”], from certain provisions of Part I of the Federal Power Act. The location... address of each applicant is: The exact name and business address of each person authorized to act as...

  14. 18 CFR 4.61 - Contents of application.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION... each person authorized to act as agent for the applicant in this application, if applicable, are: (5... section 7(a) of the Federal Power Act. See 16 U.S.C. 796. (6)(i) The statutory or regulatory requirements...

  15. 18 CFR 4.107 - Contents of application for exemption from licensing.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES... 5 megawatts or less, from licensing under the Federal Power Act. [If applicable: The project is... each applicant are: (4) The exact name and business address of each person authorized to act as agent...

  16. 18 CFR 4.107 - Contents of application for exemption from licensing.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES... 5 megawatts or less, from licensing under the Federal Power Act. [If applicable: The project is... each applicant are: (4) The exact name and business address of each person authorized to act as agent...

  17. 18 CFR 4.61 - Contents of application.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION... each person authorized to act as agent for the applicant in this application, if applicable, are: (5... section 7(a) of the Federal Power Act. See 16 U.S.C. 796. (6)(i) The statutory or regulatory requirements...

  18. 18 CFR 4.107 - Contents of application for exemption from licensing.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES... 5 megawatts or less, from licensing under the Federal Power Act. [If applicable: The project is... each applicant are: (4) The exact name and business address of each person authorized to act as agent...

  19. 18 CFR 4.61 - Contents of application.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION... each person authorized to act as agent for the applicant in this application, if applicable, are: (5... section 7(a) of the Federal Power Act. See 16 U.S.C. 796. (6)(i) The statutory or regulatory requirements...

  20. 18 CFR 4.92 - Contents of exemption application.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION..., except paragraph (b)(28)(v)”], from certain provisions of Part I of the Federal Power Act. The location... address of each applicant is: The exact name and business address of each person authorized to act as...

  1. 18 CFR 4.92 - Contents of exemption application.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION..., except paragraph (b)(28)(v)”], from certain provisions of Part I of the Federal Power Act. The location... address of each applicant is: The exact name and business address of each person authorized to act as...

  2. 18 CFR 4.61 - Contents of application.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION... each person authorized to act as agent for the applicant in this application, if applicable, are: (5... section 7(a) of the Federal Power Act. See 16 U.S.C. 796. (6)(i) The statutory or regulatory requirements...

  3. 75 FR 17681 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... generate or purchase power and transmit the power to the distribution systems. All RUS and G&T borrowers... Assistance and Training Grant Program--Recovery Act Funding. OMB Control Number: 0572-0144. Summary of Collection: The American Recovery and Reinvestment Act of 2009 (Recovery Act) provides for the availability...

  4. 29 CFR 4.102 - Administration of the Act.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., to make rules and regulations, issue orders, make decisions, and take other appropriate action under... authority and enforcement powers of the Secretary under the Act are coextensive with the authority and powers under the Walsh-Healey Act. Curtiss Wright Corp. v. McLucas 364 F. Supp. 750, 769 (D NJ 1973). ...

  5. Distributed support vector machine in master-slave mode.

    PubMed

    Chen, Qingguo; Cao, Feilong

    2018-05-01

    It is well known that the support vector machine (SVM) is an effective learning algorithm. The alternating direction method of multipliers (ADMM) algorithm has emerged as a powerful technique for solving distributed optimisation models. This paper proposes a distributed SVM algorithm in a master-slave mode (MS-DSVM), which integrates a distributed SVM and ADMM acting in a master-slave configuration where the master node and slave nodes are connected, meaning the results can be broadcasted. The distributed SVM is regarded as a regularised optimisation problem and modelled as a series of convex optimisation sub-problems that are solved by ADMM. Additionally, the over-relaxation technique is utilised to accelerate the convergence rate of the proposed MS-DSVM. Our theoretical analysis demonstrates that the proposed MS-DSVM has linear convergence, meaning it possesses the fastest convergence rate among existing standard distributed ADMM algorithms. Numerical examples demonstrate that the convergence and accuracy of the proposed MS-DSVM are superior to those of existing methods under the ADMM framework. Copyright © 2018 Elsevier Ltd. All rights reserved.

  6. 78 FR 11682 - Notice of Lodging of Proposed Consent Decree Under the Oil Pollution Act of 1990 and the Clean...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under the Oil Pollution Act of 1990 and the Clean Water Act On February 12, 2013, the Department of Justice lodged a proposed consent... claims (1) for penalties and injunctive relief under Sections 301 and 311 of the Clean Water Act (``CWA...

  7. Fluid intensifier having a double acting power chamber with interconnected signal rods

    DOEpatents

    Whitehead, John C.

    2001-01-01

    A fluid driven reciprocating apparatus having a double acting power chamber with signal rods serving as high pressure pistons, or to transmit mechanical power. The signal rods are connected to a double acting piston in the power chamber thereby eliminating the need for pilot valves, with the piston being controlled by a pair of intake-exhaust valves. The signal rod includes two spaced seals along its length with a vented space therebetween so that the driving fluid and driven fluid can't mix, and performs a switching function to eliminate separate pilot valves. The intake-exhaust valves can be integrated into a single housing with the power chamber, or these valves can be built into the cylinder head only of the power chamber, or they can be separate from the power chamber.

  8. 18 CFR 367.1650 - Account 165, Prepayments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 165, Prepayments. 367.1650 Section 367.1650 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  9. 18 CFR 367.82 - Rents.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Rents. 367.82 Section 367.82 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL...

  10. Venice Park landfill: Working with the community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McAdams, C.L.

    1993-09-01

    Venice Park landfill was one of the first sites to be permitted under Michigan's proposed Public Act 641. PA 641 essentially changed the rules and regulations for landfills from the simple design of digging a hole and filling it. It also upgraded standards to those that are more sophisticated, including liners, leachate collection systems, and gas extraction systems. In 1992, methane gas from the landfill was collected into wells drilled into the trash varying in depth from 30-50 feet in depth. A vacuum pulls the gas from the trash into the wells, then through a piping system. The landfill usesmore » about 80-100 kilowatts in-house. The remainder of the gas is sold to Consumers Power Co. which uses landfill gas to supply power to homes.« less

  11. Reactor safeguards system assessment and design. Volume I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Varnado, G.B.; Ericson, D.M. Jr.; Daniel, S.L.

    1978-06-01

    This report describes the development and application of a methodology for evaluating the effectiveness of nuclear power reactor safeguards systems. Analytic techniques are used to identify the sabotage acts which could lead to release of radioactive material from a nuclear power plant, to determine the areas of a plant which must be protected to assure that significant release does not occur, to model the physical plant layout, and to evaluate the effectiveness of various safeguards systems. The methodology was used to identify those aspects of reactor safeguards systems which have the greatest effect on overall system performance and which, therefore,more » should be emphasized in the licensing process. With further refinements, the methodology can be used by the licensing reviewer to aid in assessing proposed or existing safeguards systems.« less

  12. Energy harvesting from arterial blood pressure for powering embedded brain sensors

    NASA Astrophysics Data System (ADS)

    Nanda, Aditya; Karami, M. Amin

    2016-04-01

    This paper investigates energy harvesting from arterial blood pressure via the piezoelectric effect by using a novel streaked cylinder geometry for the purpose of powering embedded micro-sensors in the brain. Initially, we look at the energy harvested by a piezoelectric cylinder placed inside an artery acted upon by blood pressure. Such an arrangement would be tantamount to constructing a stent out of piezoelectric materials. A stent is a cylinder placed in veins and arteries to prevent obstruction in blood flow. The governing equations of a conductor coated piezoelectric cylinder are obtained using Hamilton's principle. Pressure acting in arteries is radially directed and this is used to simplify the modal analysis and obtain the transfer function relating pressure to the induced voltage across the surface of the harvester. The power harvested by the cylindrical harvester is obtained for different shunt resistances. Radially directed pressure occurs elsewhere and we also look at harvesting energy from oil flow in pipelines. Although the energy harvested by the cylindrical energy harvester is significant at resonance, the natural frequency of the system is found to be very high. To decrease the natural frequency, we propose a novel streaked stent design by cutting it along the length, transforming it to a curved plate and decreasing the natural frequency. The governing equations corresponding to the new geometry are derived using Hamilton's principle and modal analysis is used to obtain the transfer function.

  13. 75 FR 3230 - Sunshine Act Meeting Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ...-1051-000 ISO New England Inc. and New England Power Pool. E-8 RM08-7-002 Modification of Interchange... Systems Power Pool Inc. E-14 EL09-40-000 Southwest Power Pool, Inc. E-15 EL10-7-000 Power and Water... Section 23 of the Natural Gas Act. G-2 RP06-569-000, RP07-376-000 Transcontinental Gas Pipe Line...

  14. 18 CFR 35.21 - Applicability to licensees and others subject to section 19 or 20 of the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Applicability to licensees and others subject to section 19 or 20 of the Federal Power Act. 35.21 Section 35.21 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS...

  15. An Energy Efficient Technique Using Electric Active Shielding for Capacitive Coupling Intra-Body Communication

    PubMed Central

    Ma, Chao; Huang, Zhonghua; Wang, Zhiqi; Zhou, Linxuan; Li, Yinlin

    2017-01-01

    Capacitive coupling intra-body communication (CC-IBC) has become one of the candidates for healthcare sensor networks due to its positive prevailing features of energy efficiency, transmission rate and security. Under the CC-IBC scheme, some of the electric field emitted from signal (SIG) electrode of the transmitter will couple directly to the ground (GND) electrode, acting equivalently as an internal impedance of the signal source and inducing considerable energy losses. However, none of the previous works have fully studied the problem. In this paper, the underlying theory of such energy loss is investigated and quantitatively evaluated using conventional parameters. Accordingly, a method of electric active shielding is proposed to reduce the displacement current across the SIG-GND electrodes, leading to less power loss. In addition, the variation of such loss in regard to frequency range and positions on human body was also considered. The theory was validated by finite element method simulation and experimental measurement. The prototype result shows that the receiving power has been improved by approximate 5.5 dBm while the total power consumption is maximally 9 mW less using the proposed technique, providing an energy efficient option in physical layer for wearable and implantable healthcare sensor networks. PMID:28885546

  16. The virtual infinite capacitor

    NASA Astrophysics Data System (ADS)

    Yona, Guy; Weiss, George

    2017-01-01

    We define the virtual infinite capacitor (VIC) as a nonlinear capacitor that has the property that for an interval of the charge Q (the operating range), the voltage V remains constant. We propose a lossless approximate realisation for the VIC as a simple circuit with two controllers: a voltage controller acts fast to maintain the desired terminal voltage, while a charge controller acts more slowly and maintains the charge Q in the desired operating range by influencing the incoming current. The VIC is useful as a filter capacitor for various applications, for example, power factor compensators (PFC), as we describe. In spite of using small capacitors, the VIC can replace a very large capacitor in applications that do not require substantial energy storage. We give simulation results for a PFC working in critical conduction mode with a VIC for output voltage filtering.

  17. Idaho Habitat and Natural Production Monitoring Part I, 1993 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rich, Bruce A.; Petrosky, Charles E.

    The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating proposed and existing habitat improvement projects for rainbow-steelhead trout Oncorhynchus mykiss and chinook salmon O. tshawytscha in the Clearwater River and Salmon River drainages on a large scale for the past 8 years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed using increased carrying capacity and/or survival as the best measures ofmore » benefit from a habitat enhancement project. Determination of full benefit from a project depends on completion or maturation of the project and presence of adequate numbers of fish to document actual increases in fish production. The depressed status of upriver anadromous stocks has precluded measuring full benefits of any habitat project in Idaho. Partial benefit is credited to the mitigation record in the interim period of run restoration.« less

  18. 18 CFR 367.3950 - Account 395, Laboratory equipment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 395, Laboratory equipment. 367.3950 Section 367.3950 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  19. 18 CFR 367.1840 - Account 184, Clearing accounts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 184, Clearing accounts. 367.1840 Section 367.1840 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  20. 18 CFR 367.15 - Contingent assets and liabilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Contingent assets and liabilities. 367.15 Section 367.15 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  1. 18 CFR 367.1410 - Account 141, Notes receivable.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 141, Notes receivable. 367.1410 Section 367.1410 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  2. 18 CFR 367.1850 - Account 185, Temporary facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 185, Temporary facilities. 367.1850 Section 367.1850 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  3. 18 CFR 367.1350 - Account 135, Working funds.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 135, Working funds. 367.1350 Section 367.1350 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  4. 18 CFR 367.2370 - Account 237, Interest accrued.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 237, Interest accrued. 367.2370 Section 367.2370 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  5. 18 CFR 367.1720 - Account 172, Rents receivable.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 172, Rents receivable. 367.1720 Section 367.1720 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  6. 18 CFR 367.2380 - Account 238, Dividends declared.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 238, Dividends declared. 367.2380 Section 367.2380 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  7. 18 CFR 367.2010 - Account 201, Common stock issued.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 201, Common stock issued. 367.2010 Section 367.2010 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT...

  8. 18 CFR 367.2320 - Account 232, Accounts payable.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 232, Accounts payable. 367.2320 Section 367.2320 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  9. 18 CFR 367.1730 - Account 173, Accrued revenues.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 173, Accrued revenues. 367.1730 Section 367.1730 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...

  10. 18 CFR 367.2040 - Account 204, Preferred stock issued.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 204, Preferred stock issued. 367.2040 Section 367.2040 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT...

  11. 18 CFR 367.1010 - Account 101, Service company property.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 101, Service company property. 367.1010 Section 367.1010 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT...

  12. 18 CFR 367.2420 - Account 242, Miscellaneous current and accrued liabilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., FEDERAL POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Current and Accrued Liabilities... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 242, Miscellaneous current and accrued liabilities. 367.2420 Section 367.2420 Conservation of Power and Water...

  13. 18 CFR 367.1810 - Account 181, Unamortized debt expense.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 181, Unamortized debt expense. 367.1810 Section 367.1810 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT...

  14. 18 CFR 367.2530 - Account, 253, Other deferred credits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account, 253, Other deferred credits. 367.2530 Section 367.2530 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT...

  15. 18 CFR 367.2300 - Account 230, Asset retirement obligations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 230, Asset retirement obligations. 367.2300 Section 367.2300 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT...

  16. 18 CFR 367.2410 - Account 241, Tax collections payable.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 241, Tax collections payable. 367.2410 Section 367.2410 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT...

  17. 18 CFR 366.6 - Previously authorized activities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Previously authorized activities. 366.6 Section 366.6 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal...

  18. 18 CFR 366.6 - Previously authorized activities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Previously authorized activities. 366.6 Section 366.6 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal...

  19. 77 FR 64821 - Notice of Submission of Proposed Information Collection to OMB; Emergency Comment Request; Real...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Proposed Information Collection to OMB; Emergency Comment Request; Real Estate Settlement Procedures Act... Proposal: Real Estate Settlement Procedures Act (RESPA) Disclosures. OMB Control Number, if applicable... reinstatement of a discontinued information collection. The Real Estate Settlement Procedures Act of 1974...

  20. 75 FR 10504 - Division of Energy Employees Occupational Illness Compensation Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... Occupational Illness Compensation Proposed Collection; Comment Request ACTION: Notice. SUMMARY: The Department... concerning the proposed collection: Energy Employees Occupational Illness Compensation Program Act Forms... Occupational Illness Compensation Program Act of 2000, as amended (EEOICPA or Act), 42 U.S.C. 7384 et seq. The...

  1. 18 CFR 382.203 - Annual charges under the Interstate Commerce Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Annual charges under the Interstate Commerce Act. 382.203 Section 382.203 Conservation of Power and Water Resources FEDERAL... § 382.203 Annual charges under the Interstate Commerce Act. (a) The adjusted costs of administration of...

  2. 18 CFR 382.203 - Annual charges under the Interstate Commerce Act.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Annual charges under the Interstate Commerce Act. 382.203 Section 382.203 Conservation of Power and Water Resources FEDERAL... § 382.203 Annual charges under the Interstate Commerce Act. (a) The adjusted costs of administration of...

  3. 18 CFR 382.203 - Annual charges under the Interstate Commerce Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Annual charges under the Interstate Commerce Act. 382.203 Section 382.203 Conservation of Power and Water Resources FEDERAL... § 382.203 Annual charges under the Interstate Commerce Act. (a) The adjusted costs of administration of...

  4. 18 CFR 382.203 - Annual charges under the Interstate Commerce Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Annual charges under the Interstate Commerce Act. 382.203 Section 382.203 Conservation of Power and Water Resources FEDERAL... § 382.203 Annual charges under the Interstate Commerce Act. (a) The adjusted costs of administration of...

  5. 18 CFR 382.203 - Annual charges under the Interstate Commerce Act.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Annual charges under the Interstate Commerce Act. 382.203 Section 382.203 Conservation of Power and Water Resources FEDERAL... § 382.203 Annual charges under the Interstate Commerce Act. (a) The adjusted costs of administration of...

  6. 75 FR 67657 - Prohibition of Market Manipulation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ...-manipulation authority'' as part of its expanded enforcement powers. It does so by amending section 6(c) of the... commerce by telegraph, telephone, wireless, or other means of communication false or misleading or... 315 and 1283 of the Energy Policy Act of 2005, amending the Natural Gas Act and the Federal Power Act...

  7. 18 CFR 367.1520 - Account 152, Fuel stock expenses undistributed.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 152, Fuel stock... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005... TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL...

  8. 78 FR 5256 - Annual Charges for Use of Government Lands

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    .... Information Collection Statement 67 B. Environmental Analysis 68 C. Regulatory Flexibility Act 69 D. Document.... Background 2. Section 10(e)(1) of the Federal Power Act (FPA) requires the hydropower licensees occupying... Amendment to Section 11.21 of the Regulations Under the Federal Power Act, 56 FPC 3860, at 3863 (1976). \\4...

  9. 77 FR 60484 - PowerShares Exchange-Traded Fund Trust, et al.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... SECURITIES AND EXCHANGE COMMISSION [Investment Company Act Release No. 30222; 812-13820] Power... 12(d)(1)(J) of the Investment Company Act of 1940 (the ``Act'') for exemptions from sections 12(d)(1... certain registered open-end management investment companies that operate as ``funds of funds'' to acquire...

  10. 10 CFR 904.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Hoover Power Plant Act (43 U.S.C. 619). (d) Central Arizona Project shall mean those works as described... amended. (e) Colorado River Dam Fund or Fund shall mean that special fund established by section 2 of the..., the Colorado River Basin Project Act of 1968, and the Hoover Power Plant Act. (f) Contract shall mean...

  11. 10 CFR 904.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Hoover Power Plant Act (43 U.S.C. 619). (d) Central Arizona Project shall mean those works as described... amended. (e) Colorado River Dam Fund or Fund shall mean that special fund established by section 2 of the..., the Colorado River Basin Project Act of 1968, and the Hoover Power Plant Act. (f) Contract shall mean...

  12. 10 CFR 904.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Hoover Power Plant Act (43 U.S.C. 619). (d) Central Arizona Project shall mean those works as described... amended. (e) Colorado River Dam Fund or Fund shall mean that special fund established by section 2 of the..., the Colorado River Basin Project Act of 1968, and the Hoover Power Plant Act. (f) Contract shall mean...

  13. 10 CFR 904.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Hoover Power Plant Act (43 U.S.C. 619). (d) Central Arizona Project shall mean those works as described... amended. (e) Colorado River Dam Fund or Fund shall mean that special fund established by section 2 of the..., the Colorado River Basin Project Act of 1968, and the Hoover Power Plant Act. (f) Contract shall mean...

  14. 10 CFR 904.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Hoover Power Plant Act (43 U.S.C. 619). (d) Central Arizona Project shall mean those works as described... amended. (e) Colorado River Dam Fund or Fund shall mean that special fund established by section 2 of the..., the Colorado River Basin Project Act of 1968, and the Hoover Power Plant Act. (f) Contract shall mean...

  15. 78 FR 1251 - Notice of Lodging of Proposed Consent Decree Under the Clean Air Act, the Clean Water Act and the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under the Clean Air Act, the Clean Water Act and the Resource Conservation and Recovery Act On December 31, 2012, the Department of....C. 7401 et seq.; the Clean Water Act, 33 U.S.C. 1301 et seq.; and the Resource Conservation and...

  16. Energy usage, problems and policy proposals: evidence from distinctive villages in poverty-stricken loess areas

    NASA Astrophysics Data System (ADS)

    Xie, Xinglong; Xue, Weixian

    2018-02-01

    The aim of this paper is to examine energy consumption among poverty-stricken loess areas of middle Gansu, and put forward a settlement to energy upgrading and meanwhile mitigating environmental contagion and shaking off poverty. Energy consumption of 371 households from 3 distinctive categories of landform is explored. The surveyed data investigation displays that energy consumption composition is marked by clear dissimilarity of power mix, with stalk(41%) and coal(32.3%) acting as the major form, fire grass a powerful supplement, and the remaining power resources playing a tiny part for the mountain; coal(52.45%) being the dominant power, dry grasses(20%) and stalk (17.6%) performing a supplemental part, other resources of power being at the insignificant position for the semi-mountain; beside which there being a similar energy pattern on the plain except stalk composing a tiny share of 7.5%. This energy mix is mainly attributed to economic poverty, and provokes a list of ills such as plant damage, water loss and soil erosion, ultimately posing a formidable threat to sustainable development. A fresh energy engineering mode termed quaternity-dominating pattern is introduced and addressed, which can lift the sample areas out of poverty both in economics and energy. The paper concludes with pointing out practical proposals on launching and running this energy engineering project for the sample areas. This paper contributes to the growing body of knowledge by exploring energy use among poverty-stricken regions, usually being disregarded in most studies of China.

  17. The paradox of agency: Feeling powerful reduces brokerage opportunity recognition yet increases willingness to broker.

    PubMed

    Landis, Blaine; Kilduff, Martin; Menges, Jochen I; Kilduff, Gavin J

    2018-04-16

    Research suggests positions of brokerage in organizational networks provide many benefits, but studies tend to assume everyone is equally able to perceive and willing to act on brokerage opportunities. Here we challenge these assumptions in a direct investigation of whether people can perceive brokerage opportunities and are willing to broker. We propose that the psychological experience of power diminishes individuals' ability to perceive opportunities to broker between people who are not directly connected in their networks, yet enhances their willingness to broker. In Study 1, we find that employees in a marketing and media agency who had a high sense of power were likely to see fewer brokerage opportunities in their advice networks. In Study 2, we provide causal evidence for this claim in an experiment where the psychological experience of power is manipulated. Those who felt powerful, relative to those who felt little power, tended to see fewer brokerage opportunities than actually existed, yet were more willing to broker, irrespective of whether there was a brokerage opportunity present. Collectively, these findings present a paradox of agency: Individuals who experience power are likely to underperceive the very brokerage opportunities for which their sense of agency is suited. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  18. Experimental Evaluation of a Method for Turbocharging Four-Stroke, Single Cylinder, Internal Combustion Engines

    NASA Astrophysics Data System (ADS)

    Buchman, Michael; Winter, Amos

    2015-11-01

    Turbocharging an engine increases specific power, improves fuel economy, reduces emissions, and lowers cost compared to a naturally aspirated engine of the same power output. These advantages make turbocharging commonplace for multi-cylinder engines. Single cylinder engineers are not commonly turbocharged due to the phase lag between the exhaust stroke, which powers the turbocharger, and the intake stroke, when air is pumped into the engine. Our proposed method of turbocharging single cylinder engines is to add an ``air capacitor'' to the intake manifold, an additional volume that acts as a buffer to store compressed air between the exhaust and intake strokes, and smooth out the pressure pulses from the turbocharger. This talk presents experimental results from a single cylinder, turbocharged diesel engine fit with various sized air capacitors. Power output from the engine was measured using a dynamometer made from a generator, with the electrical power dissipated with resistive heating elements. We found that intake air density increases with capacitor size as theoretically predicted, ranging from 40 to 60 percent depending on heat transfer. Our experiment was able to produce 29 percent more power compared to using natural aspiration. These results validated that an air capacitor and turbocharger may be a simple, cost effective means of increasing the power density of single cylinder engines.

  19. Development of a hardware-based AC microgrid for AC stability assessment

    NASA Astrophysics Data System (ADS)

    Swanson, Robert R.

    As more power electronic-based devices enable the development of high-bandwidth AC microgrids, the topic of microgrid power distribution stability has become of increased interest. Recently, researchers have proposed a relatively straightforward method to assess the stability of AC systems based upon the time-constants of sources, the net bus capacitance, and the rate limits of sources. In this research, a focus has been to develop a hardware test system to evaluate AC system stability. As a first step, a time domain model of a two converter microgrid was established in which a three phase inverter acts as a power source and an active rectifier serves as an adjustable constant power AC load. The constant power load can be utilized to create rapid power flow transients to the generating system. As a second step, the inverter and active rectifier were designed using a Smart Power Module IGBT for switching and an embedded microcontroller as a processor for algorithm implementation. The inverter and active rectifier were designed to operate simultaneously using a synchronization signal to ensure each respective local controller operates in a common reference frame. Finally, the physical system was created and initial testing performed to validate the hardware functionality as a variable amplitude and variable frequency AC system.

  20. How to Make Eccentricity Cycles in Stratigraphy: the Role of Compaction

    NASA Astrophysics Data System (ADS)

    Liu, W.; Hinnov, L.; Wu, H.; Pas, D.

    2017-12-01

    Milankovitch cycles from astronomically driven climate variations have been demonstrated as preserved in cyclostratigraphy throughout geologic time. These stratigraphic cycles have been identified in many types of proxies, e.g., gamma ray, magnetic susceptibility, oxygen isotopes, carbonate content, grayscale, etc. However, the commonly prominent spectral power of orbital eccentricity cycles in stratigraphy is paradoxical to insolation, which is dominated by precession index power. How is the spectral power transferred from precession to eccentricity in stratigraphy? Nonlinear sedimentation and bioturbation have long been identified as players in this transference. Here, we propose that in the absence of bioturbation differential compaction can generate the transference. Using insolation time series, we trace the steps by which insolation is transformed into stratigraphy, and how differential compaction of lithology acts to transfer spectral power from precession to eccentricity. Differential compaction is applied to unique values of insolation, which is assumed to control the type of deposited sediment. High compaction is applied to muds, and progressively lower compaction is applied to silts and sands, or carbonate. Linear differential compaction promotes eccentricity spectral power, but nonlinear differential compaction elevates eccentricity spectral power to dominance and precession spectral power to near collapse as is often observed in real stratigraphy. Keywords: differential compaction, cyclostratigraphy, insolation, eccentricity

  1. Superconducting-circuit quantum heat engine with frequency resolved thermal baths

    NASA Astrophysics Data System (ADS)

    Hofer, Patrick P.; Souquet, Jean-René; Clerk, Aashish A.

    The study of quantum heat engines promises to unravel deep, fundamental concepts in quantum thermodynamics. With this in mind, we propose a novel, realistic device that efficiently converts heat into work while maintaining reasonably large output powers. The key concept in our proposal is a highly peaked spectral density in both the thermal baths as well as the working fluid. This allows for a complete separation of the heat current from the working fluid. In our setup, Cooper pairs tunnelling across a Josephson junction serve as the the working fluid, while two resonant cavities coupled to the junction act as frequency-resolved thermal baths. The device is operated such that a heat flux carried entirely by the photons induces an electrical current against a voltage bias, providing work.

  2. 75 FR 26275 - Notice of Lodging of Proposed Consent Decree Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under the Clean Water Act... Hovnanian's violations of the Clean Water Act (``CWA'') as well as violations of state and federal National... by the Consent Decree. The proposed Complaint alleges three types of storm water violations...

  3. Energy conservation strategy in Hydraulic Power Packs using Variable Frequency Drive IOP Conference Series: Materials Science and Engineering

    NASA Astrophysics Data System (ADS)

    Ramesh, S.; Ashok, S. Denis; Nagaraj, Shanmukha; Reddy, M. Lohith Kumar; Naulakha, Niranjan Kumar; Adithyakumar, C. R.

    2018-02-01

    At present, energy consumption is to such an extent that if the same trend goes on then in the future at some point of time, the energy sources will all be exploited. Energy conservation in a hydraulic power pack refers to the reduction in the energy consumed by the power pack. Many experiments have been conducted to reduce the energy consumption and one of those methods is by introducing a variable frequency drive. The main objective of the present work is to reduce the energy consumed by the hydraulic power pack using variable frequency drive. Variable Frequency drive is used to vary the speed of the motor by receiving electrical signals from the pressure switch which acts as the feedback system. Using this concept, the speed of the motor can be varied between the specified limits. In the present work, a basic hydraulic power pack and a variable frequency drive based hydraulic power pack were designed and compared both of them with the results obtained. The comparison was based on the power consumed, rise in temperature, noise levels, and flow of oil through pressure relief valve, total oil flow during loading cycle. By comparing both the circuits, it is found that for the proposed system, consumption of power reduces by 78.4% and is as powerful as the present system.

  4. 18 CFR 366.2 - Commission access to books and records.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Commission access to books and records. 366.2 Section 366.2 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the...

  5. 18 CFR 3c.2 - Nonpublic information.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Nonpublic information. 3c.2 Section 3c.2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...)) of the Federal Power Act, and section 8(b) (15 U.S.C. 717g) of the Natural Gas Act prohibit any...

  6. 18 CFR 367.2240 - Account 224, Other long-term debt.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 224, Other long-term debt. 367.2240 Section 367.2240 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT...

  7. 18 CFR 367.2330 - Account 233, Notes payable to associate companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Current and Accrued Liabilities § 367.2330... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 233, Notes payable to associate companies. 367.2330 Section 367.2330 Conservation of Power and Water Resources...

  8. 18 CFR 367.2430 - Account 243, Obligations under capital leases-Current.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Current and Accrued Liabilities § 367.2430... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 243, Obligations under capital leases-Current. 367.2430 Section 367.2430 Conservation of Power and Water Resources...

  9. 18 CFR 367.1060 - Account 106, Completed construction not classified.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 106, Completed construction not classified. 367.1060 Section 367.1060 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT...

  10. 18 CFR 367.1460 - Account 146, Accounts receivable from associate companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Current and Accrued Assets § 367.1460... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 146, Accounts receivable from associate companies. 367.1460 Section 367.1460 Conservation of Power and Water Resources...

  11. 18 CFR 367.1740 - Account 174, Miscellaneous current and accrued assets.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Current and Accrued Assets § 367.1740... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 174, Miscellaneous current and accrued assets. 367.1740 Section 367.1740 Conservation of Power and Water Resources...

  12. 18 CFR 367.1890 - Account 189, Unamortized loss on reacquired debt.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Deferred Debits § 367.1890 Account 189... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 189, Unamortized loss on reacquired debt. 367.1890 Section 367.1890 Conservation of Power and Water Resources...

  13. 18 CFR 367.2340 - Account 234, Accounts payable to associate companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Current and Accrued Liabilities § 367.2340... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 234, Accounts payable to associate companies. 367.2340 Section 367.2340 Conservation of Power and Water Resources...

  14. 18 CFR 367.2161 - Account 216.1, Unappropriated undistributed subsidiary earnings.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., FEDERAL POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Proprietary Capital § 367.2161... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 216.1, Unappropriated undistributed subsidiary earnings. 367.2161 Section 367.2161 Conservation of Power and Water...

  15. 18 CFR 367.2270 - Account 227, Obligations under capital lease-Non-current.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., FEDERAL POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Other Noncurrent Liabilities § 367... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 227, Obligations under capital lease-Non-current. 367.2270 Section 367.2270 Conservation of Power and Water...

  16. 18 CFR 367.1450 - Account 145, Notes receivable from associate companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Current and Accrued Assets § 367.1450... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 145, Notes receivable from associate companies. 367.1450 Section 367.1450 Conservation of Power and Water Resources...

  17. 18 CFR 366.22 - Accounts and records of service companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Accounts and records of service companies. 366.22 Section 366.22 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Accounting and Recordkeeping Under PUHCA 2005, the...

  18. 18 CFR 366.21 - Accounts and records of holding companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Accounts and records of holding companies. 366.21 Section 366.21 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Accounting and Recordkeeping Under PUHCA 2005, the...

  19. Damage in Monolithic Thin-Film Photovoltaic Modules Due to Partial Shade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silverman, Timothy J.; Mansfield, Lorelle; Repins, Ingrid

    2016-09-01

    The typical configuration of monolithic thin-film photovoltaic modules makes it possible for partial shade to place one or more cells in such a module in reverse bias. Reverse bias operation leads to high voltage, current density, and power density conditions, which can act as driving forces for failure. We showed that a brief outdoor shadow event can cause a 7% permanent loss in power. We applied an indoor partial shade durability test that moves beyond the standard hot spot endurance test by using more realistic mask and bias conditions and by carefully quantifying the permanent change in performance due tomore » the stress. With the addition of a pass criterion based on change in maximum power, this procedure will soon be proposed as a part of the module-type qualification test. All six commercial copper indium gallium diselenide and cadmium telluride modules we tested experienced permanent damage due to the indoor partial shade test, ranging from 4% to 14% loss in maximum power. We conclude by summarizing ways to mitigate partial shade stress at the cell, module, and system levels.« less

  20. 12 CFR 550.110 - Who will act on my application?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Who will act on my application? 550.110 Section 550.110 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY FIDUCIARY POWERS OF SAVINGS ASSOCIATIONS Obtaining Fiduciary Powers § 550.110 Who will act on my application? The Director of...

  1. 12 CFR 550.110 - Who will act on my application?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Who will act on my application? 550.110 Section 550.110 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY FIDUCIARY POWERS OF SAVINGS ASSOCIATIONS Obtaining Fiduciary Powers § 550.110 Who will act on my application? The Director of...

  2. 76 FR 15236 - Freedom of Information Act Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-21

    ... Freedom of Information Act Regulations AGENCY: Department of Justice. ACTION: Proposed rule. SUMMARY: This rule proposes revisions to the Department's regulations under the Freedom of Information Act (FOIA... processing requests for records under the Freedom of Information Act (FOIA), 5 U.S.C. 552 as amended. These...

  3. 78 FR 24227 - Notice of Proposed Information Collection; Comment Request: Real Estate Settlement Procedures Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Information Collection; Comment Request: Real Estate Settlement Procedures Act (RESPA) Disclosures AGENCY.... Description of the need for the information and proposed use: The Real Estate Settlement Procedures Act of... Act), rulemaking authority for and certain enforcement authorities with respect to the Real Estate...

  4. Optical power-based interrogation of plasmonic tilted fiber Bragg grating biosensors

    NASA Astrophysics Data System (ADS)

    González-Vila, Á.; Lopez-Aldaba, A.; Kinet, D.; Mégret, P.; Lopez-Amo, M.; Caucheteur, C.

    2017-04-01

    Two interrogation techniques for plasmonic tilted fiber Bragg grating sensors are reported and experimentally tested. Typical interrogation methods are usually based on tracking the wavelength shift of the most sensitive cladding mode, but for biosensing applications, spectrometer-based methods can be replaced by more efficient solutions. The proposed techniques thus rely on the measurement of the induced changes in optical power. The first one consists of a properly polarized tunable laser source set to emit at the wavelength of the sensor most sensitive mode and an optical power meter to measure the transmitted response. For the second method, a uniform fiber Bragg grating is photo-inscribed beyond the sensor in such a way that its central wavelength matches the sensor most sensitive mode, acting as an optical filter. Using a LED source, light reflected backwards by this grating is partially attenuated when passing through the sensor due to plasmon wave excitation and the power changes are quantified once again with an optical power meter. A performance analysis of the techniques is carried out and they both result competitive interrogation solutions. The work thus focuses on the development of cost-effective alternatives for monitoring this kind of biosensors in practical situations.

  5. Optimum electric utility spot price determinations for small power producing facilities operating under PURPA provisions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghoudjehbaklou, H.; Puttgen, H.B.

    This paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility strives to use spot prices which maximize itsmore » revenues from any given Small Power Producing Facility, SPPF, a schedule while respecting the general regulatory and contractual framework. the proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.« less

  6. Optimum electric utility spot price determinations for small power producing facilities operating under PURPA provisions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghoudjehbaklou, H.; Puttgen, H.B.

    The present paper outlines an optimum spot price determination procedure in the general context of the Public Utility Regulatory Policies Act, PURPA, provisions. PURPA stipulates that local utilities must offer to purchase all available excess electric energy from Qualifying Facilities, QF, at fair market prices. As a direct consequence of these PURPA regulations, a growing number of owners are installing power producing facilities and optimize their operational schedules to minimize their utility related costs or, in some cases, actually maximize their revenues from energy sales to the local utility. In turn, the utility will strive to use spot prices whichmore » maximize its revenues from any given Small Power Producing Facility, SPPF, schedule while respecting the general regulatory and contractual framework. The proposed optimum spot price determination procedure fully models the SPPF operation, it enforces the contractual and regulatory restrictions, and it ensures the uniqueness of the optimum SPPF schedule.« less

  7. Switchable dual-wavelength SOA-based fiber laser with continuous tunability over the C-band at room-temperature.

    PubMed

    Ummy, M A; Madamopoulos, N; Razani, M; Hossain, A; Dorsinville, R

    2012-10-08

    We propose and demonstrate a simple compact, inexpensive, SOA-based, dual-wavelength tunable fiber laser, that can potentially be used for photoconductive mixing and generation of waves in the microwave and THz regions. A C-band semiconductor optical amplifier (SOA) is placed inside a linear cavity with two Sagnac loop mirrors at its either ends, which act as both reflectors and output ports. The selectivity of dual wavelengths and the tunability of the wavelength difference (Δλ) between them is accomplished by placing a narrow bandwidth (e.g., 0.3 nm) tunable thin film-based filter and a fiber Bragg grating (with bandwidth 0.28 nm) inside the loop mirror that operates as the output port. A total output power of + 6.9 dBm for the two wavelengths is measured and the potential for higher output powers is discussed. Optical power and wavelength stability are measured at 0.33 dB and 0.014 nm, respectively.

  8. 76 FR 67784 - Self-Regulatory Organizations; BATS Y-Exchange, Inc.; Order Approving Proposed Rule Change To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... connection with this reclassification, the Exchange has proposed certain voting rights,\\4\\ transfer... Securities Exchange Act of 1934 (``Act''),\\1\\ and Rule 19b-4 thereunder,\\2\\ a proposed rule change to amend... Exchange Act Release No. 65299 (September 8, 2011), 76 FR 56833 (September 14, 2011) (``Notice''). II...

  9. 78 FR 44598 - Notice of Lodging of Proposed Consent Decree Under the Comprehensive Environmental Response...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under the Comprehensive Environmental Response, Compensation, and Liability Act, the Resource Conservation and Recovery Act, and the Clean Water Act On July 18, 2013, the Department of Justice lodged a proposed Consent Decree with the United States District Court for the Southern...

  10. 78 FR 69875 - Notice of Lodging of Proposed Consent Decree Under the Oil Pollution Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under the Oil Pollution Act On November 15, 2013, the Department of Justice lodged a proposed consent decree with the United States... against Suncor (U.S.A.) Inc. (``Suncor'') pursuant to the Oil Pollution Act, 33 U.S.C. 2701-2762. The...

  11. 78 FR 1251 - Notice of Lodging of Proposed Consent Decree Under the Oil Pollution Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under the Oil Pollution Act On December 21, 2012, the Department of Justice lodged a proposed consent decree with the United States... Oil Pollution Act, 33 U.S.C. 2702, 2706, and Section 128D of the Hawaii Environmental Response law...

  12. 78 FR 41423 - Notice of Lodging of Proposed Consent Decree Under the Oil Pollution Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under the Oil Pollution Act On July 2, 2013, the Department of Justice lodged a proposed Consent Decree with the United States... 1002 of the Oil Pollution Act, 33 U.S.C. 2702 and similar Alaska state provisions. The natural resource...

  13. Refocusing Adult Education on Career and Postsecondary Success: An Analysis of Adult Education (Title II) Provisions in WIA Reauthorization Proposals

    ERIC Educational Resources Information Center

    Foster, Marcie

    2012-01-01

    Two proposals to reauthorize the Workforce Investment Act (WIA) are in the House of Representatives: the "Workforce Investment and Improvement Act of 2012" ("H.R. 4297") and the "Workforce Investment Act of 2012" ("H.R. 4227"). Both proposals reflect a priority of greater alignment among adult education…

  14. 75 FR 7627 - Notice of Lodging of Proposed Consent Decree Under the Federal Water Pollution Control Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    .... (``Defendants'') under the pre-treatment requirements of the Federal Water Pollution Control Act (Clean Water... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under the Federal Water Pollution Control Act Notice is hereby given that on February 16, 2010, a proposed Consent Decree was filed...

  15. Optimizing the Operation of Windfarms, Energy Storage and Flexible Loads in Modern Power Systems and Deregulated Electricity Markets

    NASA Astrophysics Data System (ADS)

    Dar, Zamiyad

    The amount of wind energy in power systems is increasing at a significant rate. With this increased penetration, there are certain problems associated with the operation of windfarms which need careful attention. In the operations side, the wake effects of upstream wind turbines on downstream wind turbines can cause a reduction in the total generated power of a windfarm. On the market side, the fluctuation of real-time prices can make the operation of windfarms less profitable. Similarly, the intermittent nature of wind power prevents the windfarms from participating in the day-ahead and forward markets. On the system side, the volatile nature of wind speeds is also an obstacle for windfarms to provide frequency regulation to the system. In this thesis, we address these issues and optimize the operation of windfarms in power systems and deregulated electricity markets. First, the total power generation in a windfarm is maximized by using yaw angle of wind turbines as a control variable. We extend the existing wake models to include the effects of yaw misalignment and wake deflection of wind turbines. A numerical study is performed to find the optimal values of induction factor and yaw misalignment angle of wind turbines in a single row of a windfarm for achieving the maximum total power with wake effects. The numerical study shows that the maximum power is achieved by keeping the induction factor close to 1/3 and only changing the yaw angle to deflect the wake. We then propose a Dynamic Programming Framework (DPF) to maximize the total power production of a windfarm using yaw angle as the control variable. We compare the windfarm efficiency achieved with our DPF with the efficiency values obtained through greedy control strategy and induction factor optimization. We also extend our expressions to a windfarm with multiple rows and columns of turbines and perform simulations on the 3x3 and 4x4 grid topologies. Our results show that the optimal induction factor for most turbines is quite close to 1/3 and yaw angle acts as the dominant optimization variable. In the next part of this dissertation, a system comprising of a windfarm and energy storage operating in real-time electricity markets is studied. An Energy-balancing Threshold Price (ETP) policy is proposed to maximize the revenue of a windfarm with on-site storage. We propose and analyze a scheme for a windfarm to store or sell energy based on a threshold price. The threshold price is calculated based on long-term distributions of the electricity price and wind power generation processes, and is chosen so as to balance the energy flows in and out of the storage-equipped windfarm. It is also shown mathematically that the proposed policy is optimal in terms of the long-term revenue generated. Comparing it with the optimal policy that has knowledge of the future, we observe that the revenue obtained by the proposed ETP policy is approximately 90% of the maximum attainable revenue at a storage capacity of 10-15 times the power rating of the windfarm. The intermittent nature of wind power is a hindrance to the efficient participation of windfarms in the day-ahead and forward electricity markets. In this regard, a flexible forward contract is proposed in this dissertation which allows the windfarms to enter into a forward contract with flexible load with an option to deviate from the contracted amount of power. Using such a flexible contract would allow the windfarms to supply more or less than the contracted amount of power in case of unexpected wind conditions or real-time prices. We also propose models for forecasting wind power and real-time electricity prices. The comparison between the proposed contracting framework and a simple fixed contract (currently existing in the market) for different levels of flexibility and load shows that there is a net gain in windfarm revenues, if the transaction price of the two contracts are set equal. Lastly, we present and analyze distributed control schemes for frequency regulation in a smart grid using energy storage, wind generators, demand response and conventional generators while having no communication or data sharing between them. We also propose a novel control scheme for frequency support by energy storage in which the power output of energy storage changes proportionally with the reduction in its available energy. The application of the proposed control schemes indicates an improvement in system frequency characteristics, when there is a sudden net loss of generation.

  16. 18 CFR 367.2250 - Account 225, Unamortized premium on long-term debt.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Long-Term Debt § 367.2250 Account 225... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 225, Unamortized premium on long-term debt. 367.2250 Section 367.2250 Conservation of Power and Water Resources...

  17. 18 CFR 367.2260 - Account 226, Unamortized discount on long-term debt-Debit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., FEDERAL POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Long-Term Debt § 367.2260 Account... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 226, Unamortized discount on long-term debt-Debit. 367.2260 Section 367.2260 Conservation of Power and Water...

  18. 18 CFR 382.201 - Annual charges under Parts II and III of the Federal Power Act and related statutes.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... annual charges to be assessed to power marketing agencies. The adjusted costs of administration of the... Act and related statutes. (a) Determination of costs to be assessed to public utilities. The adjusted costs of administration of the electric regulatory program, excluding the costs of regulating the Power...

  19. 18 CFR 366.3 - Exemption from Commission access to books and records; waivers of accounting, record-retention...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Exemption from.... 366.3 Section 366.3 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal Power Act and...

  20. 18 CFR 366.7 - Procedures for obtaining exempt wholesale generator and foreign utility company status.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Procedures for... Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER... RECORDS Definitions and Provisions Under PUHCA 2005, the Federal Power Act and the Natural Gas Act § 366.7...

  1. 25 CFR 169.27 - Power projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Power projects. 169.27 Section 169.27 Indians BUREAU OF... projects. (a) The Act of March 4, 1911 (36 Stat. 1253), as amended by the Act of May 27, 1952 (66 Stat. 95... on any project for the generation of electric power, or the transmission or distribution of...

  2. 18 CFR 367.4211 - Account 421.1, Gain on disposition of property.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 421.1, Gain on disposition of property. 367.4211 Section 367.4211 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT...

  3. 18 CFR 367.4212 - Account 421.2, Loss on disposition of property.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 421.2, Loss on disposition of property. 367.4212 Section 367.4212 Conservation of Power and Water Resources FEDERAL ENERGY..., FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT...

  4. 25 CFR 169.27 - Power projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Power projects. 169.27 Section 169.27 Indians BUREAU OF... projects. (a) The Act of March 4, 1911 (36 Stat. 1253), as amended by the Act of May 27, 1952 (66 Stat. 95... on any project for the generation of electric power, or the transmission or distribution of...

  5. 25 CFR 169.27 - Power projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Power projects. 169.27 Section 169.27 Indians BUREAU OF... projects. (a) The Act of March 4, 1911 (36 Stat. 1253), as amended by the Act of May 27, 1952 (66 Stat. 95... on any project for the generation of electric power, or the transmission or distribution of...

  6. 25 CFR 169.27 - Power projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Power projects. 169.27 Section 169.27 Indians BUREAU OF... projects. (a) The Act of March 4, 1911 (36 Stat. 1253), as amended by the Act of May 27, 1952 (66 Stat. 95... on any project for the generation of electric power, or the transmission or distribution of...

  7. The Availability of Judicial Review Regarding Military Base Closures and Realignments

    DTIC Science & Technology

    2005-06-30

    held that the President is not subject to the APA, due to separation of powers principles.37 Base Closure Act Claims The Dalton Court distinguished...that the 1988 Base Closure Act violated the non-delegation doctrine and the separation of powers doctrine.53 However, the Base Closure Act has not yet been held unconstitutional by any federal appellate courts.

  8. 77 FR 62139 - Authorizing the Implementation of Certain Sanctions Set Forth in the Iran Threat Reduction and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ... Emergency Economic Powers Act (50 U.S.C. 1701 et seq.) (IEEPA), the National Emergencies Act (50 U.S.C. 1601... this section, and had knowledge that the person engaged in the activities referred to in that... Security Council Travel Bans and International Emergency Economic Powers Act Sanctions). Sec. 11. The...

  9. Applying the Equal Pay Act to State and Local Governments: The Effect of National League of Cities v. Usery

    ERIC Educational Resources Information Center

    University of Pennsylvania Law Review, 1977

    1977-01-01

    The constitutionality of the Equal Pay Act is examined as an exercise of Congress' power under the enforcement clause of the fourteenth amendment and it is concluded that application of the Act to public employees in both traditional and nontraditional governmental functions is a constitutional exercise of that congressional power. (LBH)

  10. Pacific Northwest Electric Power Planning and Conservation Act : Legislative History of the Act to Assist the Electrical Consumers of the Pacific Northwest through use of the Federal Columbia River Power System to Achieve Cost-Effective Energy Conservation : P.L. 96-501, 94 Stat. 2697.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1981-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act became effective when it was signed into law by President Carter on December 5, 1980. This ended a four-year debate over legislation designed to plan and coordinate the region's energy future. This legislative history is an abbreviated version taken from the larger historical file maintained by the BPA Law Library. It is intended to assist BPA personnel and others who are studying the Northwest Power Act and working on its implementation. The documents included were selected for their value in determining what Congress meant in enacting the statute and to providemore » the researcher with a starting point for further investigation. These documents include: a history of the Act, a chronology of the legislative action leading to passage of the law; a section-by-section analysis of the Act; the Congressional Records of Senate and House debates on the bill and its amendments, and a list of Congressional committee hearings.« less

  11. Accurate Human Tissue Characterization for Energy-Efficient Wireless On-Body Communications

    PubMed Central

    Vallejo, Mónica; Recas, Joaquín; del Valle, Pablo García; Ayala, José L.

    2013-01-01

    The demand for Wireless Body Sensor Networks (WBSNs) is rapidly increasing due to the revolution in wearable systems demonstrated by the penetration of on-the-body sensors in hospitals, sports medicine and general health-care practices. In WBSN, the body acts as a communication channel for the propagation of electromagnetic (EM) waves, where losses are mainly due to absorption of power in the tissue. This paper shows the effects of the dielectric properties of biological tissues in the signal strength and, for the first time, relates these effects with the human body composition. After a careful analysis of results, this work proposes a reactive algorithm for power transmission to alleviate the effect of body movement and body type. This policy achieves up to 40.8% energy savings in a realistic scenario with no performance overhead. PMID:23752565

  12. Fiber optics frequency comb enabled linear optical sampling with operation wavelength range extension.

    PubMed

    Liao, Ruolin; Wu, Zhichao; Fu, Songnian; Zhu, Shengnan; Yu, Zhe; Tang, Ming; Liu, Deming

    2018-02-01

    Although the linear optical sampling (LOS) technique is powerful enough to characterize various advanced modulation formats with high symbol rates, the central wavelength of a pulsed local oscillator (LO) needs to be carefully set according to that of the signal under test, due to the coherent mixing operation. Here, we experimentally demonstrate wideband LOS enabled by a fiber optics frequency comb (FOFC). Meanwhile, when the broadband FOFC acts as the pulsed LO, we propose a scheme to mitigate the enhanced sampling error arising in the non-ideal response of a balanced photodetector. Finally, precise characterizations of arbitrary 128 Gbps PDM-QPSK wavelength channels from 1550 to 1570 nm are successfully achieved, when a 101.3 MHz frequency spaced comb with a 3 dB spectral power ripple of 20 nm is used.

  13. Minimal universal quantum heat machine.

    PubMed

    Gelbwaser-Klimovsky, D; Alicki, R; Kurizki, G

    2013-01-01

    In traditional thermodynamics the Carnot cycle yields the ideal performance bound of heat engines and refrigerators. We propose and analyze a minimal model of a heat machine that can play a similar role in quantum regimes. The minimal model consists of a single two-level system with periodically modulated energy splitting that is permanently, weakly, coupled to two spectrally separated heat baths at different temperatures. The equation of motion allows us to compute the stationary power and heat currents in the machine consistent with the second law of thermodynamics. This dual-purpose machine can act as either an engine or a refrigerator (heat pump) depending on the modulation rate. In both modes of operation, the maximal Carnot efficiency is reached at zero power. We study the conditions for finite-time optimal performance for several variants of the model. Possible realizations of the model are discussed.

  14. Network information attacks on the control systems of power facilities belonging to the critical infrastructure

    NASA Astrophysics Data System (ADS)

    Loginov, E. L.; Raikov, A. N.

    2015-04-01

    The most large-scale accidents occurred as a consequence of network information attacks on the control systems of power facilities belonging to the United States' critical infrastructure are analyzed in the context of possibilities available in modern decision support systems. Trends in the development of technologies for inflicting damage to smart grids are formulated. A volume matrix of parameters characterizing attacks on facilities is constructed. A model describing the performance of a critical infrastructure's control system after an attack is developed. The recently adopted measures and legislation acts aimed at achieving more efficient protection of critical infrastructure are considered. Approaches to cognitive modeling and networked expertise of intricate situations for supporting the decision-making process, and to setting up a system of indicators for anticipatory monitoring of critical infrastructure are proposed.

  15. 77 FR 76173 - Approval and Promulgation of Implementation Plans; State of Washington; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ...EPA is proposing to partially approve and partially disapprove a Washington Regional Haze Implementation Plan (SIP) submitted by the State of Washington on December 22, 2010, that addresses regional haze for the first implementation period. This plan was submitted to meet the requirements of Clean Air Act (CAA) sections 169A and 169B that require states to prevent any future and remedy any existing man-made impairment of visibility in mandatory Class I areas. EPA is proposing to: (1) Approve portions of this SIP submittal as meeting most of the requirements of the regional haze program, (2) propose a limited approval and limited disapproval of the SO2 Best Available Retrofit Technology (BART) determination for Intalco Aluminum Corp. (Intalco) potline operation and propose a federal ``Better than BART'' alternative, and (3) propose to disapprove the NOx BART determination for five BART emission units at the Tesoro Refining and Marketing refinery (Tesoro) and propose a federal Better than BART alternative. This combined rule package of proposed SIP approved elements and proposed federal elements will meet the requirements of CAA sections 169A and 169B. On August 20, 2012, EPA approved those provisions of the Washington SIP addressing the BART determination for TransAlta Centralia Generation L.L.C. coal fired power plant (TransAlta).

  16. Feeling connected to younger versus older selves: the asymmetric impact of life stage orientation.

    PubMed

    O'Brien, Ed

    2015-01-01

    The concept of life-stage orientation is proposed. Youth is a period of time characterised by strong feelings and emotions, but weak reasoning and cognitive skill. Conversely, adulthood is characterised by strong rationality, but weak emotionality. Two studies revealed that merely bringing these concepts to mind changes real-time feelings and behaviour. Participants who were instructed to act like their "adult" selves exhibited greater self-control in a cold pressor test than control participants and those who acted like their "youth" selves (Experiment 1). However, being induced to feel connected to youth enhanced enjoyment for fun videos (Experiment 2). Hence, the extent to which people are oriented towards youth versus adulthood has asymmetric costs and benefits for the present. Connecting to youth boosts experiential capacities (in this case, enjoying oneself) at the cost of agency, whereas connecting to adulthood boosts agentic capacities (in this case, exerting will-power) at the cost of experience.

  17. Economics and Health Reform: Academic Research and Public Policy.

    PubMed

    Glied, Sherry A; Miller, Erin A

    2015-08-01

    Two prior studies, conducted in 1966 and in 1979, examined the role of economic research in health policy development. Both concluded that health economics had not been an important contributor to policy. Passage of the Affordable Care Act offers an opportunity to reassess this question. We find that the evolution of health economics research has given it an increasingly important role in policy. Research in the field has followed three related paths over the past century-institutionalist research that described problems; theoretical research, which proposed relationships that might extend beyond existing institutions; and empirical assessments of structural parameters identified in the theoretical research. These three strands operating in concert allowed economic research to be used to predict the fiscal and coverage consequences of alternative policy paths. This ability made economic research a powerful policy force. Key conclusions of health economics research are clearly evident in the Affordable Care Act. © The Author(s) 2015.

  18. 75 FR 25904 - Privacy Act of 1974; as Amended; Proposed Alteration to an Existing Privacy Act System of Records...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... SOCIAL SECURITY ADMINISTRATION Privacy Act of 1974; as Amended; Proposed Alteration to an Existing Privacy Act System of Records, Housekeeping Changes, and New Routine Uses AGENCY: Social Security..., Social Security number (SSN), date of birth, address, and other relevant information about persons who...

  19. 76 FR 66317 - Notice of Submission of Proposed Information Collection to OMB Energy Efficient Mortgages

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... and Community Development Act of 1992 (Section 106 of the Energy Policy Act of 1992). DATES: Comments... the Housing and Community Development Act of 1992 (Section 106 of the Energy Policy Act of 1992... Proposed Information Collection to OMB Energy Efficient Mortgages AGENCY: Office of the Chief Information...

  20. The British Climate Change Act: a critical evaluation and proposed alternative approach

    NASA Astrophysics Data System (ADS)

    Pielke, Roger A., Jr.

    2009-04-01

    This paper evaluates the United Kingdom's Climate Change Act of 2008 in terms of the implied rates of decarbonization of the UK economy for a short-term and a long-term target established in law. The paper uses the Kaya identity to structure the evaluation, employing both a bottom up approach (based on projections of future UK population, economic growth, and technology) and a top down approach (deriving implied rates of decarbonization consistent with the targets and various rates of projected economic growth). Both approaches indicate that the UK economy would have to achieve annual rates of decarbonization in excess of 4 or 5%. To place these numbers in context, the UK would have to achieve the 2006 carbon efficiency of France by about 2015, a level of effort comparable to the building of about 30 new nuclear power plants, displacing an equivalent amount of fossil energy. The paper argues that the magnitude of the task implied by the UK Climate Change Act strongly suggests that it is on course to fail, and discusses implications.

  1. 75 FR 6622 - The U.S. Department of Agriculture (USDA) Proposes to Revise Three of Its Privacy Act Systems of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... DEPARTMENT OF AGRICULTURE Office of the Secretary The U.S. Department of Agriculture (USDA) Proposes to Revise Three of Its Privacy Act Systems of Records AGENCY: Office of the Secretary, USDA. ACTION: The U.S. Department of Agriculture (USDA) proposes to revise three of its Privacy Act systems of...

  2. 50 CFR 402.48 - Conference on proposed species or proposed critical habitat.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE); ENDANGERED SPECIES COMMITTEE REGULATIONS SUBCHAPTER A INTERAGENCY COOPERATION-ENDANGERED SPECIES ACT OF 1973, AS AMENDED Counterpart Regulations... Rodenticide Act § 402.48 Conference on proposed species or proposed critical habitat. EPA may employ the...

  3. 50 CFR 402.48 - Conference on proposed species or proposed critical habitat.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE); ENDANGERED SPECIES COMMITTEE REGULATIONS SUBCHAPTER A INTERAGENCY COOPERATION-ENDANGERED SPECIES ACT OF 1973, AS AMENDED Counterpart Regulations Governing Actions... Act § 402.48 Conference on proposed species or proposed critical habitat. EPA may employ the...

  4. 50 CFR 402.48 - Conference on proposed species or proposed critical habitat.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE); ENDANGERED SPECIES COMMITTEE REGULATIONS SUBCHAPTER A INTERAGENCY COOPERATION-ENDANGERED SPECIES ACT OF 1973, AS AMENDED Counterpart Regulations... Rodenticide Act § 402.48 Conference on proposed species or proposed critical habitat. EPA may employ the...

  5. 50 CFR 402.48 - Conference on proposed species or proposed critical habitat.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE); ENDANGERED SPECIES COMMITTEE REGULATIONS SUBCHAPTER A INTERAGENCY COOPERATION-ENDANGERED SPECIES ACT OF 1973, AS AMENDED Counterpart Regulations... Rodenticide Act § 402.48 Conference on proposed species or proposed critical habitat. EPA may employ the...

  6. 50 CFR 402.48 - Conference on proposed species or proposed critical habitat.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE); ENDANGERED SPECIES COMMITTEE REGULATIONS SUBCHAPTER A INTERAGENCY COOPERATION-ENDANGERED SPECIES ACT OF 1973, AS AMENDED Counterpart Regulations Governing Actions... Act § 402.48 Conference on proposed species or proposed critical habitat. EPA may employ the...

  7. 18 CFR 366.4 - FERC-65, notification of holding company status, FERC-65A, exemption notification, and FERC-65B...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false FERC-65, notification... Section 366.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT... NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal Power Act and...

  8. 18 CFR 366.4 - FERC-65, notification of holding company status, FERC-65A, exemption notification, and FERC-65B...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false FERC-65, notification... Section 366.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT... NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal Power Act and...

  9. 75 FR 80034 - Privacy Act of 1974: Notice of Proposed Privacy Act System of Records Revision and Proposed New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-21

    ... purpose of enforcing the U.S. Grain Standards Act (USGSA) and certain provisions of the Agricultural Marketing Act of 1946 (AMA). GIPSA's Federal Grain Inspection Service (FGIS) administers the USGSA and... . Follow the online instructions for submitting comments. E-mail: [email protected] . Fax: (202) 690...

  10. 75 FR 77607 - Privacy Act of 1974; Proposed New System of Records; Veterinary Medicine Loan Repayment Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... DEPARTMENT OF AGRICULTURE Office of the Secretary [Docket No. 2010-0004] Privacy Act of 1974... Food and Agriculture, USDA. ACTION: Notice of a proposed new Privacy Act system of records. SUMMARY: In accordance with the Privacy Act of 1974, the Department of Agriculture (USDA), National Institute of Food and...

  11. Transport phenomena governing nicotine emissions from electronic cigarettes: model formulation and experimental investigation

    PubMed Central

    Talih, Soha; Balhas, Zainab; Salman, Rola; El-Hage, Rachel; Karaoghlanian, Nareg; El-Hellani, Ahmad; Baassiri, Mohamad; Jaroudi, Ezzat; Eissenberg, Thomas; Saliba, Najat; Shihadeh, Alan

    2017-01-01

    Electronic cigarettes (ECIGs) electrically heat and aerosolize a liquid containing propylene glycol (PG), vegetable glycerin (VG), flavorants, water, and nicotine. ECIG effects and proposed methods to regulate them are controversial. One regulatory focal point involves nicotine emissions. We describe a mathematical model that predicts ECIG nicotine emissions. The model computes the vaporization rate of individual species by numerically solving the unsteady species and energy conservation equations. To validate model predictions, yields of nicotine, total particulate matter, PG, and VG were measured while manipulating puff topography, electrical power, and liquid composition across 100 conditions. Nicotine flux, the rate at which nicotine is emitted per unit time, was the primary outcome. Across conditions, the measured and computed nicotine flux were highly correlated (r = 0.85, p<.0001). As predicted, device power, nicotine concentration, PG/VG ratio, and puff duration influenced nicotine flux (p<.05), while water content and puff velocity did not. Additional empirical investigation revealed that PG/VG liquids act as ideal solutions, that liquid vaporization accounts for more than 95% of ECIG aerosol mass emissions, and that as device power increases the aerosol composition shifts towards the less volatile components of the parent liquid. To the extent that ECIG regulations focus on nicotine emissions, mathematical models like this one can be used to predict ECIG nicotine emissions and to test the effects of proposed regulation of factors that influence nicotine flux. PMID:28706340

  12. Reconnaissance of intertidal and subtidal zones of Back Island, Behm Canal, Southeast Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strand, J.A.; Young, J.S.

    1986-09-01

    A diver reconnaissance of the intertidal and subtidal zones of Back Island, Southeast Alaska, was performed May 20-22, 1986. The specific objectives were to catalog potentially vulnerable shellfish, other invertebrates, and plant resources, and to identify potential herring spawning sites. This effort was designed to supplement the existing ecological data base for Back Island that would be used during the National Environmental Policy Act (NEPA) documentation process. A NEPA document will be prepared that describes the site environment and assesses impacts from the proposed construction and operation of the Southeast Alaska Acoustic Measurement Facility (SEAFAC). Nine diver transects were establishedmore » around Back Island. Particular attention was devoted to proposed locations for the pier and float facilities and range-operations and shore-power cable run-ups.« less

  13. Competitive negotiation: the Virginia SCC's model for procurement of generating capacity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Virginia SCC, in approving competitive alternatives to avoided costs under PURPA, rejected competitive bidding in favor of competitive negotiation for power sales contracts. The difference is important, and points in the direction of increased discretion for utilities seeking new generating capacity from independents. The distinction between competitive bidding, and competitive negotiation, in a nutshell, is that in a bid, the low price bidder wins. In a negotiation, the offeror of the most-meritorious proposals are ranked, and an attempt to reach agreement on price is made with the high-ranked offeror. Only if there is no agreement on price will themore » most-meritorious bid be rejected, and negotiations with the offeror of the next best proposal begun. The Virginia Public Procurement Act, Sec. II-37, Definitions, Parts 1, 2, and 3.a. is included.« less

  14. Kinetic characterization of oxyresveratrol as a tyrosinase substrate.

    PubMed

    Ortiz-Ruiz, Carmen Vanessa; Ballesta de Los Santos, Manuel; Berna, Jose; Fenoll, Jose; Garcia-Ruiz, Pedro Antonio; Tudela, Jose; Garcia-Canovas, Francisco

    2015-11-01

    Oxyresveratrol is a stilbenoid described as a powerful inhibitor of tyrosinase and proposed as skin-whitening and anti-browning agent. However, the enzyme is capable of acting on it, considering it as a substrate, as it has been proved in the case of its analogous resveratrol. Tyrosinase hydroxylates the oxyresveratrol to an o-diphenol and oxidizes the latter to an o-quinone, which finally isomerizes to p-quinone. For these reactions to take place the presence of the Eox (oxy-tyrosinase) form is necessary. The kinetic analysis of the proposed mechanism has allowed the kinetic characterization of this molecule as a substrate of tyrosinase, affording a catalytic constant of 5.39 ± 0.21 sec(-1) and a Michaelis constant of 8.65 ± 0.73 µM. © 2015 International Union of Biochemistry and Molecular Biology.

  15. State regulation of nuclear power and national energy policy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moeller, J.W.

    1992-12-31

    In April 1983 and January 1984, the United States Supreme Court rendered two decisions that redefined the metes and bounds of federal preemption of commercial nuclear power plant regulation. In Pacific Gas & Electric Co. v. State Energy Resources Conservation and Development Commission (PG&E), the court decided that the Atomic Energy Act of 1954, as amended (the Act), did not preempt a California state law that established a moratorium on commercial nuclear power plant construction. In Silkwood v. Kerr-McGee Corporation, the Court also decided that the Act did not preempt a claim for damages under state tort law for radiologicalmore » injuries suffered in a nuclear fuel facility regulated by the United States Nuclear Regulatory Commission (NRC). The two decisions redefined the extent of federal preemption, under the Act and other federal law, of nuclear plant regulation as well as the extend of state regulation of nuclear plants. In the eight years since PG&E and Silkwood, numerous other developments have eroded further the breadth of federal preemption of commercial nuclear power plant regulation. This Article explores the developments, since PG&E and Silkwood, that have expanded further the scope of state and local regulation of commercial nuclear power plants. Specifically, the Article first identifies the extent of state and local participation in nuclear power regulation provided by the Act and other federal loan relevant to commercial nuclear power. Second, it discusses in detail the PG&E and Silkwood decisions. The Article also considers the impact of seven specific developments on the legislative implementation of a national energy policy that contemplates a role for nuclear power.« less

  16. A New Approach for Human Forearm Motion Assist by Actuated Artificial Joint-An Inner Skeleton Robot

    NASA Astrophysics Data System (ADS)

    Kundu, Subrata Kumar; Kiguchi, Kazuo; Teramoto, Kenbu

    In order to help the physical activities of the elderly or physically disabled persons, we propose a new concept of a power-assist inner skeleton robot (i.e., actuated artificial joint) that is supposed to assist the human daily life motion from inside of the human body. This paper presents an implantable 2 degree of freedom (DOF) inner skeleton robot that is designed to assist human elbow flexion-extension motion and forearm supination-pronation motion for daily life activities. We have developed a prototype of the inner skeleton robot that is supposed to assist the motion from inside of the body and act as an actuated artificial joint. The proposed system is controlled based on the activation patterns of the electromyogram (EMG) signals of the user's muscles by applying fuzzy-neuro control method. A joint actuator with angular position sensor is designed for the inner skeleton robot and a T-Mechanism is proposed to keep the bone arrangement similar to the normal human articulation after the elbow arthroplasty. The effectiveness of the proposed system has been evaluated by experiment.

  17. Public Notice: Notice of Proposed Administrative Penalty Assessments and Opportunity to Comment

    EPA Pesticide Factsheets

    EPA is providing notice of a proposed administrative penalty assessment for alleged violations of the Clean Water Act (Act). EPA is also providing notice of opportunity to comment on the proposed penalty assessment.

  18. 76 FR 39150 - Paperwork Reduction Act of 1995, as Amended; Proposed Collection, Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... TENNESSEE VALLEY AUTHORITY Paperwork Reduction Act of 1995, as Amended; Proposed Collection, Comment Request AGENCY: Tennessee Valley Authority. ACTION: Notice. SUMMARY: The proposed information... Authority is soliciting public comments on this proposed collection as provided by 5 CFR Section 1320.8(d)(1...

  19. Sex work and the claim for grassroots legislation.

    PubMed

    Fassi, Marisa N

    2015-01-01

    The aim of this paper is to contribute to understanding of legal models that aim to control sex work, and the policy implications of these, by discussing the experience of developing a grassroots legislation bill proposal by organised sex workers in Córdoba, Argentina. The term 'grassroots legislation' here refers to a legal response that derives from the active involvement of local social movements and thus incorporates the experiential knowledge and claims of these particular social groupings in the proposal. The experience described in this paper excludes approaches that render sex workers as passive victims or as deviant perpetrators; instead, it conceives of sex workers in terms of their political subjectivity and of political subjectivity in its capacity to speak, to decide, to act and to propose. This means challenging current patterns of knowledge/power that give superiority to 'expert knowledge' above and beyond the claims, experiences, knowledge and needs of sex workers themselves as meaningful sources for law making.

  20. Robust representation and recognition of facial emotions using extreme sparse learning.

    PubMed

    Shojaeilangari, Seyedehsamaneh; Yau, Wei-Yun; Nandakumar, Karthik; Li, Jun; Teoh, Eam Khwang

    2015-07-01

    Recognition of natural emotions from human faces is an interesting topic with a wide range of potential applications, such as human-computer interaction, automated tutoring systems, image and video retrieval, smart environments, and driver warning systems. Traditionally, facial emotion recognition systems have been evaluated on laboratory controlled data, which is not representative of the environment faced in real-world applications. To robustly recognize the facial emotions in real-world natural situations, this paper proposes an approach called extreme sparse learning, which has the ability to jointly learn a dictionary (set of basis) and a nonlinear classification model. The proposed approach combines the discriminative power of extreme learning machine with the reconstruction property of sparse representation to enable accurate classification when presented with noisy signals and imperfect data recorded in natural settings. In addition, this paper presents a new local spatio-temporal descriptor that is distinctive and pose-invariant. The proposed framework is able to achieve the state-of-the-art recognition accuracy on both acted and spontaneous facial emotion databases.

  1. 77 FR 9943 - Proposed Information Collection Activity; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Proposed... 17, 2009, the President signed the American Recovery and Reinvestment Act of 2009 (Recovery Act... employment. The Recovery Act made additional changes to TANF extending supplemental grants through FY 2010...

  2. Air Force Third Party Financing Management Guide.

    DTIC Science & Technology

    1984-05-01

    lhe Public Utility Regulatory Policies Act of 1978 ( PURPA ) a l,s qualifying cogenerators to sell their power back to the utilities al the utilities...Conditions favorable to the sale of cogenerated or independrt~y produced power created by the Public Utility Regulatory Policies Act ( PURPA ) of 1978; o...electrical energy. The Public Utility Regulatory Policies Act of 1978 ( PURPA ) allows qualifying cogenerators to sell their powcr back to the

  3. Proposal for an All-Spin Artificial Neural Network: Emulating Neural and Synaptic Functionalities Through Domain Wall Motion in Ferromagnets.

    PubMed

    Sengupta, Abhronil; Shim, Yong; Roy, Kaushik

    2016-12-01

    Non-Boolean computing based on emerging post-CMOS technologies can potentially pave the way for low-power neural computing platforms. However, existing work on such emerging neuromorphic architectures have either focused on solely mimicking the neuron, or the synapse functionality. While memristive devices have been proposed to emulate biological synapses, spintronic devices have proved to be efficient at performing the thresholding operation of the neuron at ultra-low currents. In this work, we propose an All-Spin Artificial Neural Network where a single spintronic device acts as the basic building block of the system. The device offers a direct mapping to synapse and neuron functionalities in the brain while inter-layer network communication is accomplished via CMOS transistors. To the best of our knowledge, this is the first demonstration of a neural architecture where a single nanoelectronic device is able to mimic both neurons and synapses. The ultra-low voltage operation of low resistance magneto-metallic neurons enables the low-voltage operation of the array of spintronic synapses, thereby leading to ultra-low power neural architectures. Device-level simulations, calibrated to experimental results, was used to drive the circuit and system level simulations of the neural network for a standard pattern recognition problem. Simulation studies indicate energy savings by  ∼  100× in comparison to a corresponding digital/analog CMOS neuron implementation.

  4. 78 FR 31971 - Notice of Submission of Proposed Information Collection to OMB License for the Use of Personally...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-28

    ... Under the E-Government Act of 2002, Title V and the Privacy Act of 1974 AGENCY: Office of the Chief...: Title of Proposed: Information Protected Under the E-Government Act of 2002, Title V and the Privacy Act... through the use of appropriate automated collection techniques or other forms of information technology, e...

  5. 78 FR 35315 - Notice of Lodging of Proposed Consent Decree Under The Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... Clean Water Act (``CWA'') Sections 309(b) and (d) and 504, 33 U.S.C. 1319(b) and (d) and 1364, and the Florida Air and Water Pollution Control Act, Fla. Stat. Chapter 403, seeking penalties and injunctive... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under The Clean Water Act On...

  6. Wild Horse 69-kV transmission line environmental assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review andmore » approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.« less

  7. Alexander fractional differential window filter for ECG denoising.

    PubMed

    Verma, Atul Kumar; Saini, Indu; Saini, Barjinder Singh

    2018-06-01

    The electrocardiogram (ECG) non-invasively monitors the electrical activities of the heart. During the process of recording and transmission, ECG signals are often corrupted by various types of noises. Minimizations of these noises facilitate accurate detection of various anomalies. In the present paper, Alexander fractional differential window (AFDW) filter is proposed for ECG signal denoising. The designed filter is based on the concept of generalized Alexander polynomial and the R-L differential equation of fractional calculus. This concept is utilized to formulate a window that acts as a forward filter. Thereafter, the backward filter is constructed by reversing the coefficients of the forward filter. The proposed AFDW filter is then obtained by averaging of the forward and backward filter coefficients. The performance of the designed AFDW filter is validated by adding the various type of noise to the original ECG signal obtained from MIT-BIH arrhythmia database. The two non-diagnostic measure, i.e., SNR, MSE, and one diagnostic measure, i.e., wavelet energy based diagnostic distortion (WEDD) have been employed for the quantitative evaluation of the designed filter. Extensive experimentations on all the 48-records of MIT-BIH arrhythmia database resulted in average SNR of 22.014 ± 3.806365, 14.703 ± 3.790275, 13.3183 ± 3.748230; average MSE of 0.001458 ± 0.00028, 0.0078 ± 0.000319, 0.01061 ± 0.000472; and average WEDD value of 0.020169 ± 0.01306, 0.1207 ± 0.061272, 0.1432 ± 0.073588, for ECG signal contaminated by the power line, random, and the white Gaussian noise respectively. A new metric named as morphological power preservation measure (MPPM) is also proposed that account for the power preservance (as indicated by PSD plots) and the QRS morphology. The proposed AFDW filter retained much of the original (clean) signal power without any significant morphological distortion as validated by MPPM measure that were 0.0126, 0.08493, and 0.10336 for the ECG signal corrupted by the different type of noises. The versatility of the proposed AFDW filter is also validated by its application on the ECG signal from MIT-BIH database corrupted by the combination of the noises as well as on the real noisy ECG signals are taken from MIT-BIH ID database. Furthermore, the comparative study has also been done between the proposed AFDW filter and existing state of the art denoising algorithms. The results clearly prove the supremacy of our proposed AFDW filter.

  8. Toward a new understanding of legacy of early attachments for future antisocial trajectories: Evidence from two longitudinal studies

    PubMed Central

    KOCHANSKA, GRAZYNA; KIM, SANGHAG

    2013-01-01

    Early parent–child attachment has been extensively explored as a contributor to children’s future adaptive or antisocial outcomes, but the specific developmental mechanisms remain to be fully understood. We examined long-term indirect developmental sequelae of early security in two longitudinal community samples followed from infancy to early school age: the Family Study (102 mothers, fathers, and infants) and the Parent–Child Study (112 mothers and infants). Constructs at multiple levels (child characteristics, parent–child security, parental discipline, and child antisocial outcomes) were assessed using a range of methods (extensive behavioral observations in a variety of settings, informants’ ratings). Both studies supported the proposed model of infant attachment as a potent catalyst that moderates future developmental socialization trajectories, despite having few long-term main effects. In insecure dyads, a pattern of coercion emerged between children who were anger prone as toddlers and their parents, resulting in parents’ increased power-assertive discipline. Power assertion in turn predicted children’s rule-breaking conduct and a compromised capacity to delay in laboratory paradigms, as well as oppositional, disruptive, callous, and aggressive behavior rated by parents and teachers at early school age. This causal chain was absent in secure dyads, where child anger proneness was unrelated to power assertion, and power assertion was unrelated to antisocial outcomes. Early insecurity appeared to act as a catalyst for the parent–child dyad embarking on a mutually adversarial path toward antisocial outcomes, whereas security defused such a maladaptive dynamic. The possible mechanisms of those effects were proposed. PMID:22781855

  9. 75 FR 46169 - Medicare Program; Proposed Changes to the Hospital Outpatient Prospective Payment System and CY...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ...This proposed rule would revise the Medicare hospital outpatient prospective payment system (OPPS) to implement applicable statutory requirements and changes arising from our continuing experience with this system and to implement certain provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (Affordable Care Act). In this proposed rule, we describe the proposed changes to the amounts and factors used to determine the payment rates for Medicare hospital outpatient services paid under the prospective payment system. These proposed changes would be applicable to services furnished on or after January 1, 2011. In addition, this proposed rule would update the revised Medicare ambulatory surgical center (ASC) payment system to implement applicable statutory requirements and changes arising from our continuing experience with this system and to implement certain provisions of the Affordable Care Act. In this proposed rule, we set forth the proposed applicable relative payment weights and amounts for services furnished in ASCs, specific HCPCS codes to which these proposed changes would apply, and other pertinent ratesetting information for the CY 2011 ASC payment system. These proposed changes would be applicable to services furnished on or after January 1, 2011. This proposed rule also includes proposals to implement provisions of the Affordable Care Act relating to payments to hospitals for direct graduate medical education (GME) and indirect medical education (IME) costs; and new limitations on certain physician referrals to hospitals in which they have an ownership or investment interest.

  10. 75 FR 24394 - Somalia Sanctions Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... reference books, photocopies, credit reports, transcripts of statements, registered mail, insurance... alia, the International Emergency Economic Powers Act (50 U.S.C. 1701- 1706), the National Emergencies... section. Note 2 to Sec. 551.201: Section 203 of the International Emergency Economic Powers Act (50 U.S.C...

  11. 76 FR 45551 - Post-2014 Resource Pool; Loveland Area Projects, Proposed Power Allocation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... Proposed Power Allocation. SUMMARY: Western Area Power Administration (Western), a Federal power marketing... Pool Proposed Power Allocation developed under the requirements of the Power Marketing Initiative of Western's Energy Planning and Management Program (Program). Western notified the public of allocation...

  12. Research and application of key technology of electric submersible plunger pump

    NASA Astrophysics Data System (ADS)

    Qian, K.; Sun, Y. N.; Zheng, S.; Du, W. S.; Li, J. N.; Pei, G. Z.; Gao, Y.; Wu, N.

    2018-06-01

    Electric submersible plunger pump is a new generation of rodless oil production equipment, whose improvements and upgrades of key technologies are conducive to its large-scale application and reduce the cost and improve the efficiency. In this paper, the operating mechanism of the unit in-depth study, aimed at the problems existing in oilfield production, to propose an optimization method creatively, including the optimal design of a linear motor for submersible oil, development of new double-acting load-relief pump, embedded flexible closed-loop control technology, research and development of low-cost power cables. 90 oil wells were used on field application, the average pump inspection cycle is 608 days, the longest pump check cycle has exceeded 1037 days, the average power saving rate is 45.6%. Application results show that the new technology of optimization and upgrading can further improve the reliability and adaptability of electric submersible plunger pump, reduce the cost of investment.

  13. Electrothermal energy conversion using electron gas volumetric change inside semiconductors

    NASA Astrophysics Data System (ADS)

    Yazawa, K.; Shakouri, A.

    2016-07-01

    We propose and analyze an electrothermal energy converter using volumetric changes in non-equilibrium electron gas inside semiconductors. The geometric concentration of electron gas under an electric field increases the effective pressure of the electrons, and then a barrier filters out cold electrons, acting like a valve. Nano- and micro-scale features enable hot electrons to arrive at the contact in a short enough time to avoid thermalization with the lattice. Key length and time scales, preliminary device geometry, and anticipated efficiency are estimated for electronic analogs of Otto and Brayton power generators and Joule-Thomson micro refrigerators on a chip. The power generators convert the energy of incident photons from the heat source to electrical current, and the refrigerator can reduce the temperature of electrons in a semiconductor device. The analytic calculations show that a large energy conversion efficiency or coefficient of performance may be possible.

  14. SUPERVISORY CONTROL FOR PEAK REDUCTION IN COMMERCIAL BUILDINGS WHILE MAINTAINING COMFORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nutaro, James J; Olama, Mohammed M; Kuruganti, Teja

    2016-01-01

    This paper describes a supervisory control strategy for limiting peak power demand by small and medium commercial buildings while still meeting the business needs of the occupants. This control strategy has two features that make it relevant to new and existing buildings. First, it is designed to operate with building equipment, such as air conditioning and refrigeration systems, as they are presently installed in most small and medium commercial buildings. Because of this, the supervisory control could be realized as a software-only retrofit to existing building management systems. Second, the proposed control acts as a supervisory management layer over existingmore » control systems, rather than replacing them outright. The primary idea of this approach is that the controls for individual building equipment request energy resources for a control action and the supervisory control examines the requests and decides which control actions to allow while satisfying a limit on peak power demand.« less

  15. Road Nail: Experimental Solar Powered Intelligent Road Marking System

    NASA Astrophysics Data System (ADS)

    Samardžija, Dragan; Teslić, Nikola; Todorović, Branislav M.; Kovač, Erne; Isailović, Đorđe; Miladinović, Bojan

    2012-03-01

    Driving in low visibility conditions (night time, fog or heavy precipitation) is particularly challenging task with an increased probability of traffic accidents and possible injuries. Road Nail is a solar powered intelligent road marking system of wirelessly networked signaling devices that improve driver safety in low visibility conditions along hazardous roadways. Nails or signaling devices are autonomous nodes with capability to accumulate energy, exchange wireless messages, detect approaching vehicles and emit signalization light. We have built an experimental test-bed that consists of 20 nodes and a cellular gateway. Implementation details of the above system, including extensive measurements and performance evaluations in realistic field deployments are presented. A novel distributed network topology discovery scheme is proposed which integrates both sensor and wireless communication aspects, where nodes act autonomously. Finally, integration of the Road Nail system with the cellular network and the Internet is described.

  16. 78 FR 48083 - Freedom of Information Act Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... PEACE CORPS 22 CFR Part 303 RIN 0420-AA29 Freedom of Information Act Administration AGENCY: Peace Corps. ACTION: Proposed rule. SUMMARY: The proposed rule updates Peace Corps regulations on the Freedom of Information Act (FOIA) to implement guidance given by the President and the Attorney General...

  17. 76 FR 20624 - Oglethorpe Power Corporation: Proposed Biomass Power Plant

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... DEPARTMENT OF AGRICULTURE Rural Utilities Service Oglethorpe Power Corporation: Proposed Biomass Power Plant AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Availability of a Draft...) biomass plant and related facilities (Proposal) in Warren County, Georgia. The purpose of the Proposal is...

  18. ENERGY MARKETS: Concerted Actions Needed by FERC to Confront Challenges That Impede Effective Oversight

    DTIC Science & Technology

    2002-06-01

    Act PURPA Public Utilities Regulatory Policies Act QF qualifying facility RTO regional transmission organization Page 1 GAO-02-656 Energy Markets June...alternative sources of power and energy efficiency. The Public Utility Regulatory Policies Act of 1978 ( PURPA ) was enacted, in part, to augment electric...requirements.5 More significantly, by opening wholesale power markets to nonutility producers of electricity, PURPA laid the groundwork for increased competition

  19. 76 FR 20343 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended. DATES: This proposed action will... Air Force's notices for systems of records subject to the Privacy Act of 1974 (5 U.S.C. 552a), as... CONTACT address above. The proposed systems reports, as required by 5 U.S.C. 552a(r) of the Privacy Act...

  20. On phaser-based processing of impulse radio UWB over fiber systems employing SOA

    NASA Astrophysics Data System (ADS)

    Taki, H.; Azou, S.; Hamie, A.; Al Housseini, A.; Alaeddine, A.; Sharaiha, A.

    2017-07-01

    In this study, we adopt a phaser-based processing to enhance the performance of impulse radio over fiber system utilizing SOA. The amplifier has been placed at a distance in the optical link, so as to extend the coverage area of proposed transceiver. Operating in the linear or saturation region for SOA, adds ASE noise or strong nonlinearities acting on the propagated pulses, respectively. Both lead to a degradation in the power efficiency and bit error rate performance. By applying up and down analog chirping technique, we have reduced the ASE power and nonlinearity simultaneously. Based on the 5th Gaussian pulse and Abraha's combination of doublets, a significant improvement has been achieved at extremely low and high input powers entering the amplifier (<-15 dBm and 0 dBm), recording a very good bit error rate performance and power efficiency. Better signal quality was observed after photo-detector, due to the fact that waveforms with lower frequency components are less affected by SOA nonlinearity. Our scheme has proved to be effective for 1 Gbps OOK and 0.5 Gbps PPM transmissions, while reaching a distance of 160 km in the optical fiber.

  1. 76 FR 74749 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... amend its regulations to implement provisions of the Small Business Jobs Act of 2010 (Jobs Act... used in preparing its bid or proposal during contract performance. SBA also proposed to amend its... and evaluating small business subcontracting plan performance. SBA also proposed to clarify which...

  2. 18 CFR 16.17 - Procedures upon Congressional authorization of takeover.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the Federal Power Act: (a) The Commission or the Director of the Office of Energy Projects will notify... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT PROCEDURES RELATING TO TAKEOVER AND RELICENSING OF LICENSED PROJECTS Takeover Provisions for Projects Subject to...

  3. 18 CFR 16.17 - Procedures upon Congressional authorization of takeover.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the Federal Power Act: (a) The Commission or the Director of the Office of Energy Projects will notify... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT PROCEDURES RELATING TO TAKEOVER AND RELICENSING OF LICENSED PROJECTS Takeover Provisions for Projects Subject to...

  4. 18 CFR 16.17 - Procedures upon Congressional authorization of takeover.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the Federal Power Act: (a) The Commission or the Director of the Office of Energy Projects will notify... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT PROCEDURES RELATING TO TAKEOVER AND RELICENSING OF LICENSED PROJECTS Takeover Provisions for Projects Subject to...

  5. 18 CFR 16.17 - Procedures upon Congressional authorization of takeover.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the Federal Power Act: (a) The Commission or the Director of the Office of Energy Projects will notify... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT PROCEDURES RELATING TO TAKEOVER AND RELICENSING OF LICENSED PROJECTS Takeover Provisions for Projects Subject to...

  6. 18 CFR 16.17 - Procedures upon Congressional authorization of takeover.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the Federal Power Act: (a) The Commission or the Director of the Office of Energy Projects will notify... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT PROCEDURES RELATING TO TAKEOVER AND RELICENSING OF LICENSED PROJECTS Takeover Provisions for Projects Subject to...

  7. 77 FR 12567 - Proposed Information Collection; Comment Request; Submission of Conservation Efforts To Make...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... Endangered Species Act AGENCY: National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION... threatened or endangered under the Endangered Species Act. The efforts usually involve the development of a... on proposed and/or continuing information collections, as required by the Paperwork Reduction Act of...

  8. 77 FR 15368 - Clean Water Act; Availability of List Decisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-15

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9646-9] Clean Water Act; Availability of List Decisions...) proposed decision identifying water quality limited segments and associated pollutants in Oregon to be listed pursuant to section 303(d)(2) of the Clean Water Act (CWA). EPA is proposing to add 1004 water...

  9. 75 FR 25856 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... FEDERAL HOUSING FINANCE AGENCY [No. 2010-N-05] Privacy Act of 1974; System of Records AGENCY: Federal Housing Finance Agency. ACTION: Notice of the establishment of new systems of records. SUMMARY: In... Finance Agency (FHFA) gives notices of two proposed Privacy Act systems of records. The first proposed...

  10. 77 FR 70544 - Agency Information Collection Activities; Proposed Information Collection; Comment Request; Bank...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    ... Activities; Proposed Information Collection; Comment Request; Bank Secrecy Act/Money Laundering Risk... entitled, ``Bank Secrecy Act/Money Laundering Risk Assessment,'' also known as the Money Laundering Risk... collection of information set forth in this document. Bank Secrecy Act/Money Laundering Risk Assessment (OMB...

  11. 76 FR 9610 - Notice of Proposed Consent Decree Under the Clean Air Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... pollution control technology; undertake periodic equipment testing; and to submit required reports. The... DEPARTMENT OF JUSTICE Notice of Proposed Consent Decree Under the Clean Air Act Notice is hereby... the Eastern District of California. The Consent Decree in this Clean Air Act enforcement action...

  12. 77 FR 49060 - Proposed Information Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-15

    ... Public Law 111-47, section 501(a). Section 1471 is part of the new Foreign Account Tax Compliance Act... of the new Foreign Account Tax Compliance Act (FATCA) legislative framework to obtain reporting from... proposed and/or continuing information collections, as required by the Paperwork Reduction Act of 1995...

  13. 76 FR 40723 - Agency Information Collection Activities; Proposed Collection; Comment Request; Clean Water Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... grants to States for the establishment of State Water Pollution Control Revolving Funds (SRF). The... (CWA). The 1987 Act declares that water pollution control revolving funds shall be administered by an... Activities; Proposed Collection; Comment Request; Clean Water Act State Revolving Fund Program AGENCY...

  14. 76 FR 44289 - Amendment to Standard for All-Terrain Vehicles; Notice of Proposed Rulemaking

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-25

    .... ACTION: Notice of proposed rulemaking. SUMMARY: The Consumer Product Safety Improvement Act of 2008.... Background The Consumer Product Safety Improvement Act of 2008 (``CPSIA'') directed the Commission to... and the Consumer Product Safety Improvement Act's (CPSIA) lead content requirements on ATVs intended...

  15. 76 FR 27801 - Capital Requirements of Swap Dealers and Major Swap Participants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ...The Commodity Futures Trading Commission (Commission or CFTC) is proposing regulations that would implement the new statutory framework in the Commodity Exchange Act (CEA), added by the Wall Street Reform and Consumer Protection Act (Dodd-Frank Act). These new provisions of the CEA require, among other things, the Commission to adopt capital requirements for certain swap dealers (SDs) and major swap participants (MSPs). The proposed rules also provide for related financial condition reporting and recordkeeping by SDs and MSPs. The Commission further proposes to amend existing capital and financial reporting regulations for futures commission merchants (FCMs) that also register as SDs or MSPs. The proposed regulations also include requirements for supplemental FCM financial reporting to reflect section 724 of the Dodd-Frank Act. In order to align the comment periods for this proposed rule and the Commission's earlier proposed rulemaking on margin requirements for uncleared swaps,\\1\\ the comment period for the proposed margin rulemaking is being extended elsewhere in the Federal Register today, so that commenters will have the opportunity to review the proposed capital and margin rules together before the expiration of the comment periods for either proposed rule. ---------------------------------------------------------------------------

  16. Study of Contactless Power Supply for Spindle Ultrasonic Vibrator

    NASA Astrophysics Data System (ADS)

    Chen, T. R.; Lee, Y. L.; Liu, H. T.; Chen, S. M.; Chang, H. Z.

    2017-11-01

    In this study, a contactless power supply for the ultrasonic motor on the spindle is proposed. The proposed power supply is composed of a series-parallel resonant circuit and a cylindrical contactless transformer. Based on the study and rotation experiments, it can be seen that the proposed power supply can both provide a stable ac power with 25 kHz / 70 V to the ultrasonic motor. When the output power is 250 W, the efficiency of the proposed supply is 89.8 % in respectively rotation tests. When the output power is more than 150 W, the efficiency of the proposed supply is higher than 80 % within the rated output power range.

  17. 78 FR 73196 - Proposed Information Collection Activity; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-05

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Proposed Information Collection Activity; Comment Request Proposed Projects Title: Child and Family Services Plan (CFSP... Act (the Act), States, Territories, and Tribes are required to submit a Child and Family Services Plan...

  18. 78 FR 40513 - Division of Energy Employees Occupational Illness Compensation; Proposed Extension of Existing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ... Occupational Illness Compensation; Proposed Extension of Existing Collection; Comment Request ACTION: Notice... is soliciting comments concerning the proposed collection: Energy Employees Occupational Illness... Energy Employees Occupational Illness Compensation Program Act of 2000, as amended (EEOICPA or Act), 42 U...

  19. 75 FR 45697 - Paperwork Reduction Act of 1995, as Amended by Public Law 104-13; Proposed Collection, Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... TENNESSEE VALLEY AUTHORITY Paperwork Reduction Act of 1995, as Amended by Public Law 104-13; Proposed Collection, Comment Request AGENCY: Tennessee Valley Authority. ACTION: Proposed collection... U.S.C. chapter 35, as [[Page 45698

  20. Improving flexibility characteristics of 200 MW unit

    NASA Astrophysics Data System (ADS)

    Taler, Jan; Trojan, Marcin; Taler, Dawid; Dzierwa, Piotr; Kaczmarski, Karol

    2017-03-01

    Calculations were performed of the thermal system of a power plant with installed water pressure tanks. The maximum rise in the block electric power resulting from the shut-off of low-pressure regenerative heaters is determined. At that time, the boiler is fed with hot water from water pressure tanks acting as heat accumulators. Accumulation of hot water in water tanks is also proposed in the periods of the power unit small load. In order to lower the plant electric power in the off-peak night hours, water heated in low-pressure regenerative heaters and feed water tank to the nominal temperature is directed to water pressure tanks. The water accumulated during the night is used to feed the boiler during the period of peak demand for electricity. Drops in the power block electric power were determined for different capacities of the tanks and periods when they are charged. A financial and economic profitability analysis (of costs and benefits) is made of the use of tanks for a 200 MW power unit. Operating in the automatic system of frequency and power control, the tanks may also be used to ensure a sudden increase in the electric power of the unit. The results of the performed calculations and analyses indicate that installation of water pressure tanks is well justified. The investment is profitable. Water pressure tanks may not only be used to reduce the power unit power during the off-peak night hours and raise it in the periods of peak demand, but also to increase the power capacity fast at any time. They may also be used to fill the boiler evaporator with hot water during the power unit start-up from the cold state.

  1. 3D-Pharmacophore Identification for κ-Opioid Agonists Using Ligand-Based Drug-Design Techniques

    NASA Astrophysics Data System (ADS)

    Yamaotsu, Noriyuki; Hirono, Shuichi

    A selective κ-opioid receptor (KOR) agonist might act as a powerful analgesic without the side effects of μ-opioid receptor-selective drugs such as morphine. The eight classes of known KOR agonists have different chemical structures, making it difficult to construct a pharmacophore model that takes them all into account. Here, we summarize previous efforts to identify the pharmacophore for κ-opioid agonists and propose a new three-dimensional pharmacophore model that encompasses the κ-activities of all classes. This utilizes conformational sampling of agonists by high-temperature molecular dynamics and pharmacophore extraction through a series of molecular superpositions.

  2. The indexed time table approach for planning and acting

    NASA Technical Reports Server (NTRS)

    Ghallab, Malik; Alaoui, Amine Mounir

    1989-01-01

    A representation is discussed of symbolic temporal relations, called IxTeT, that is both powerful enough at the reasoning level for tasks such as plan generation, refinement and modification, and efficient enough for dealing with real time constraints in action monitoring and reactive planning. Such representation for dealing with time is needed in a teleoperated space robot. After a brief survey of known approaches, the proposed representation shows its computational efficiency for managing a large data base of temporal relations. Reactive planning with IxTeT is described and exemplified through the problem of mission planning and modification for a simple surveying satellite.

  3. Control strategy for a variable-speed wind energy conversion system

    NASA Technical Reports Server (NTRS)

    Jacob, A.; Veillette, D.; Rajagopalan, V.

    1979-01-01

    A control concept for a variable-speed wind energy conversion system is proposed, for which a self-exited asynchronous cage generator is used along with a system of thyristor converters. The control loops are the following: (1) regulation of the entrainment speed as function of available mechanical energy by acting on the resistance couple of the asynchronous generator; (2) control of electric power delivered to the asynchronous machine, functioning as a motor, for start-up of the vertical axis wind converter; and (3) limitation of the slip value, and by consequence, of the induction currents in the presence of sudden variations of input parameters.

  4. 78 FR 4832 - Order Denying Export Privileges

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... thereunder; any regulation, license, or order issued under the International Emergency Economic Powers Act... the Regulations in effect under the International Emergency Economic Powers Act (50 U.S.C. 1701, et.... Obtain from the Denied Person in the United States any item subject to the Regulations with knowledge or...

  5. 77 FR 72341 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    .... Applicants: Capital Research and Management Company. Description: Request for Amended Order Under Section 203 of the Federal Power Act of Capital Research and Management Company, et. al. Filed Date: 11/28/12... Authorization Under Section 203 of the Federal Power Act and Request for Expedited Consideration. Filed Date: 11...

  6. 18 CFR 5.1 - Applicability, definitions, and requirement to consult.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT INTEGRATED... an existing project subject to Sections 14 and 15 of the Federal Power Act; or (3) Subsequent license..., the Federal agency administering any United States lands utilized or occupied by the project, the...

  7. 18 CFR 5.1 - Applicability, definitions, and requirement to consult.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT INTEGRATED... an existing project subject to Sections 14 and 15 of the Federal Power Act; or (3) Subsequent license..., the Federal agency administering any United States lands utilized or occupied by the project, the...

  8. 18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... such facility uses any primary energy source other than geothermal resources. (c) General rule. Any... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... Federal Power Act, except: (1) Sections 205 and 206; however, sales of energy or capacity made by...

  9. 18 CFR 4.80 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...

  10. 18 CFR 4.80 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...

  11. 18 CFR 4.80 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...

  12. 18 CFR 4.80 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...

  13. 18 CFR 4.80 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary Permit § 4.80... water power project under Part I of the Federal Power Act while the permittee obtains the data and performs the acts required to determine the feasibility of the project and to support an application for a...

  14. 18 CFR 1312.4 - Prohibited acts and criminal penalties.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Prohibited acts and criminal penalties. 1312.4 Section 1312.4 Conservation of Power and Water Resources TENNESSEE VALLEY... archaeological value of the archaeological resources involved and the cost of restoration and repair of such...

  15. 77 FR 67276 - Yemen Sanctions Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... reference books, photocopies, credit reports, transcripts of statements, registered mail, insurance... authority of, inter alia, the International Emergency Economic Powers Act (50 U.S.C. 1701 et seq.) and the... International Emergency Economic Powers Act (50 U.S.C. 1701-1706), in Section 203 (50 U.S.C. 1702), authorizes...

  16. 18 CFR 740.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Definitions. 740.2 Section 740.2 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.2 Definitions. Act means the Water Resources Planning Act (as amended), Pub. L. 89...

  17. 18 CFR 740.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Definitions. 740.2 Section 740.2 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.2 Definitions. Act means the Water Resources Planning Act (as amended), Pub. L. 89...

  18. 18 CFR 740.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Definitions. 740.2 Section 740.2 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.2 Definitions. Act means the Water Resources Planning Act (as amended), Pub. L. 89...

  19. 18 CFR 740.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Definitions. 740.2 Section 740.2 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.2 Definitions. Act means the Water Resources Planning Act (as amended), Pub. L. 89...

  20. 18 CFR 740.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Definitions. 740.2 Section 740.2 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.2 Definitions. Act means the Water Resources Planning Act (as amended), Pub. L. 89...

  1. 18 CFR 33.8 - Number of copies.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT APPLICATIONS UNDER FEDERAL POWER ACT SECTION 203 § 33.8 Number of copies. The applicant must submit the application or petition to the Secretary of the..., the applicant must submit all such information in electronic format (e.g., on computer diskette or on...

  2. 18 CFR 33.8 - Number of copies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT APPLICATIONS UNDER FEDERAL POWER ACT SECTION 203 § 33.8 Number of copies. The applicant must submit the application or petition to the Secretary of the..., the applicant must submit all such information in electronic format (e.g., on computer diskette or on...

  3. 18 CFR 33.8 - Number of copies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT APPLICATIONS UNDER FEDERAL POWER ACT SECTION 203 § 33.8 Number of copies. An original and eight copies of the application under this part must be submitted. If..., the applicant must submit all such information in electronic format (e.g., on computer diskette or on...

  4. 76 FR 77963 - Oglethorpe Power Corporation; Proposed Biomass Power Plant

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... Service Oglethorpe Power Corporation; Proposed Biomass Power Plant AGENCY: Rural Utilities Service, USDA... construction of a 100 megawatt (MW) biomass plant and related facilities (Proposal) in Warren County, Georgia...

  5. Visible light communications using predistortion signal to enhance the response of passive optical receiver

    NASA Astrophysics Data System (ADS)

    Liu, Yang; Chen, Hung-Yu; Liang, Kevin; Wei, Liang-Yu; Chow, Chi-Wai; Yeh, Chien-Hung

    2016-01-01

    Traditional visible light communication (VLC) uses positive-intrinsic-negative photodiode (PD) or avalanche PD as the optical receivers (Rx). We demonstrate using a solar cell as the VLC Rx. The solar cell is flexible and low cost and converts the optical signal into an electrical signal directly without the need of external power supply. In addition to acting as the VLC passive Rx, the converted electrical signal from the solar cell can charge up the battery of the Rx nodes. Hence, the proposed scheme can be a promising candidate for the future Internet of Things network. However, a solar cell acting as a VLC Rx is very challenging, since the response of the solar cell is limited. Here, we propose and demonstrate using predistortion to significantly enhance the solar cell Rx response for the first time up to the authors' knowledge. Experimental results show that the response of the solar cell Rx is significantly enhanced; and the original 2-kHz detection bandwidth of the solar cell can be enhanced by 250 times for receiving 500-kbit/s VLC signal at a transmission distance of 1 m. The operation principle, the generated voltage by the solar cell, and the maximum data rates achieved at different transmission distances are also studied.

  6. On the preparation of environmental impact statements in the United States of America

    NASA Astrophysics Data System (ADS)

    Carson, James E.

    The National Environmental Policy Act of 1969 (NEPA) requires that an Environmental Impact Statement (FIS) be prepared whenever a federal action is considered that could result in a significant impact on the environment. Such actions include the issuance of construction or operating licenses for nuclear facilities and power plants, hydroelectric dams, or the diversion of water from rivers and lakes. An EIS is usually required if federal funds are involved. The U.S. Environmental Protection Agency and U.S. Council for Environmental Quality have developed guidelines and regulations for the preparation of an EIS. An EIS is not a scientific report. It is a legal document whose primary function is its use by decision-making agencies in approving or not approving the proposed federal action. The EIS is also used to inform the public and other government agencies of the environmental impacts of the proposed facility. The NEPA process allows public input into the decision-making process. An EIS should be short and concise, analytical, conclusory, be written for a non-technical audience, discuss the pros and cons of the proposed facility, and examine the impacts of all alternatives to the proposed action. The EIS should identify all adverse environmental impacts that cannot be avoided. The conclusions reached in the EIS should be clearly stated and supported by discussions and data in the text and by references to show that the agency has made the necessary analyses. The paper discusses the purpose and contents of these documents and the environmental procedures used in the U.S.A., especially as they relate to nuclear power plants.

  7. 78 FR 60023 - Endangered and Threatened Wildlife and Plants; Proposed Threatened Status for the Rufa Red Knot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ...We, the U.S. Fish and Wildlife Service, propose to list the rufa red knot (Calidris canutus rufa) as a threatened species under the Endangered Species Act of 1973, as amended (Act). If we finalize this rule as proposed, it would extend the Act's protections to this species. The effect of this regulation will be to add this species to the List of Endangered and Threatened Wildlife.

  8. Unintended Consequences of the Goldwater-Nichols Act (Joint Force Quarterly, Spring 1998)

    DTIC Science & Technology

    1998-01-01

    Armed Forces to achieve mili- tary success, the unified direction of DOD neces- sary for budgetary efficiency, and the separation of powers demanded by...its actions. The Constitution has stood for two centuries precisely because it flexibly applies simple concepts such as the separation of powers and...replaced, it has created a national military command structure that ignores the separation of powers . The amended National Security Act has consolidated

  9. 78 FR 35201 - Endangered and Threatened Wildlife and Plants; Listing All Chimpanzees as Endangered

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ...We, the U.S. Fish and Wildlife Service, propose to list all chimpanzees (Pan troglodytes) as endangered under the Endangered Species Act of 1973, as amended (Act). We are taking this action in response to a petition to list the entire species, whether in the wild or in captivity, as endangered under the Act. This proposal constitutes our 12-month finding on the petition and announces our finding that listing all chimpanzees as endangered is warranted. This document also serves as our 5-year review of the species. If we finalize this rule as proposed, we would eliminate the separate classification of captive and wild chimpanzees under the Act and extend the Act's protections to captive chimpanzees in the United States. In addition, we propose to amend the special rule for primates to remove chimpanzees from the rule. If the listing of all chimpanzees as endangered is finalized, the provisions of the special rule can no longer be applied to captive chimpanzees. We seek comments from the public on this proposed rule.

  10. Availability Based Tariff and its impact On different Industry Players-A Review

    NASA Astrophysics Data System (ADS)

    Holmukhe, R. M.; Pawar, Yogini; Desai, R. S.; Hasarmani, T. S.

    2010-10-01

    ABT is a performance-based tariff for the supply of electricity by generators owned and controlled by the central government. It is also a new system of scheduling and dispatch, which requires both generators and beneficiaries to commit to day-ahead schedules. It is a system of rewards and penalties seeking to enforce day ahead pre-committed schedules, though variations are permitted if notified One and one half hours in advance. The order emphasizes prompt payment of dues. ABT (Availability Based Tariff) along with the Electricity Act of 2003 is perhaps the most significant and definitive step taken in the Indian power sector so far to bring more efficiency and focus to this vital infrastructure. The ABT mechanism is based on financial principles. ABT scheme is for unscheduled interchange of power. The paper reviews ABT issues, its components, clauses, mechanism, benefits and the impact of grid on different players like generation utilities, grid operator, consumers involved in power generation, transmission and distribution. While the proposed tariff structure has wide implications for each player, this deals exclusively with the technology challenges/opportunities thrown up by ABT.

  11. Nursing resistance as ethical action: literature review.

    PubMed

    Peter, Elizabeth; Lunardi, Valeria Lerch; Macfarlane, Amy

    2004-05-01

    Much has been written about nursing as a predominantly female profession whose members display passivity, submission, obedience and powerlessness. Alternatively, some authors have presented evidence of nurses' capacity to exercise power, revealing the possible relationship between powerlessness and ethical compromise. Thus, empowerment strategies for nurses can yield ethical action. The aim of this paper is to use analysis of the literature to demonstrate how the actions and responses of nurses to ethical concerns are examples of nurses exercising power. Empirical studies published in the nursing literature between 1990 and 2003 have been analysed to illustrate how nurses' actions of resistance can ensure that moral values are realized in practice. Foucauldian notions of power relations and feminist ethics provide the theoretical framework. Nurses were found to resist in situations where they experienced moral conflicts in relation to the actions of health professionals; however, instances were cited where they did not. Consequently, strategies for nursing education and management are proposed to increase nurses' understanding of the potential acts of resistance that they could employ in situations of moral conflict or concern.

  12. 78 FR 40542 - Privacy Act of 1974, As Amended: Proposed New Routine Use

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2013-0032] Privacy Act of 1974, As Amended: Proposed New Routine Use AGENCY: Social Security Administration. ACTION: New Proposed Routine Use...: Master Files of Social Security Number (SSN) Holders and SSN Applications, (60-0058) (the Enumeration...

  13. 77 FR 517 - Notice of Lodging of Consent Decree Under the Clean Air Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... given that on December 29, 2011, a proposed consent decree in United States, et al. v. Essroc Cement... statutory and regulatory requirements of the Clean Air Act (the ``Act'') at Essroc cement plants: the... X at five cement kilns. The proposed consent decree also requires testing a selective catalytic...

  14. 75 FR 39041 - Notice of Lodging of Proposed Consent Decree Under the Solid Waste Disposal Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... DEPARTMENT OF JUSTICE Notice of Lodging of Proposed Consent Decree Under the Solid Waste Disposal... the Solid Waste Disposal Act (as amended by the Resource Conservation and Recovery Act), 42 U.S.C... to wildlife, at its commercial oilfield waste disposal facility, located in Campbell County, Wyoming...

  15. 75 FR 26196 - Notice of Proposed New Recreation Fee Site; Federal Lands Recreation Enhancement Act, (Title VIII...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Proposed New Recreation Fee Site; Federal Lands Recreation Enhancement Act, (Title VIII, Pub. L. 108-447) AGENCY: National Forests in Mississippi, Forest... Enhancement Act (Title VII, Pub. L. 108-447) directed the Secretary of Agriculture to publish advance notice...

  16. 75 FR 67719 - Proposed Consent Decree, Clean Air Act Citizen Suit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9220-1] Proposed Consent Decree, Clean Air Act Citizen Suit... suit to compel the Administrator to take final action under section 110(k) of the Act on Imperial... special characters and any form of encryption, and may be mailed to the mailing address above. FOR FURTHER...

  17. 77 FR 74129 - Approval and Promulgation of Implementation Plans; Texas; Public Participation for Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ...EPA is proposing to approve revisions to the Texas State Implementation Plan (SIP) that establish the public participation requirements for air quality permits. EPA proposes to find that these revisions to the Texas SIP comply with the Federal Clean Air Act (the Act or CAA) and EPA regulations and are consistent with EPA policies. Texas submitted the public participation provisions in four separate revisions to the SIP on July 22, 1998; October 25, 1999; July 2, 2010; and March 11, 2011. EPA is proposing this action under section 110 and parts C and D of the Clean Air Act (the Act).

  18. 77 FR 23532 - Self-Regulatory Organizations; NYSE Amex LLC; Order Granting Approval of a Proposed Rule Change...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ...-Regulatory Organizations; NYSE Amex LLC; Order Granting Approval of a Proposed Rule Change Amending NYSE Amex... Securities Exchange Act of 1934 (``Act'') \\1\\ and Rule 19b-4 thereunder,\\2\\ a proposed rule change to amend....'' The proposed rule change was published for comment in the Federal Register on March 5, 2012.\\3\\ The...

  19. 17 CFR 240.19b-7 - Filings with respect to proposed rule changes submitted pursuant to Section 19(b)(7) of the Act.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... submitted pursuant to Section 19(b)(7) of the Act. Preliminary Note: A self-regulatory organization also... proposed rule changes. (a) Filings with respect to proposed rule changes by a self-regulatory organization... organization on the proposed rule change. (c) Self-regulatory organizations shall retain at their principle...

  20. 17 CFR 240.19b-7 - Filings with respect to proposed rule changes submitted pursuant to Section 19(b)(7) of the Act.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... submitted pursuant to Section 19(b)(7) of the Act. Preliminary Note: A self-regulatory organization also... proposed rule changes. (a) Filings with respect to proposed rule changes by a self-regulatory organization... organization on the proposed rule change. (c) Self-regulatory organizations shall retain at their principle...

Top